Loading...
HomeMy WebLinkAboutAGENDA REPORT 2021 0203 CCSA REG ITEM 10FCITY OF MOORPARK, 
CALIFORNIA City Council Meeting of February 3, 2021 ACTION Approved Staff Recommendation. BY B.Garza. F. Consider Plans and Specifications and Project Approval and Authorization to Advertise for Bids for the City Hall Administration Building Bathroom Renovation and Sewer Line Replacement Project. Staff Recommendation: 1) Approve plans and specifications for Administration Building Bathroom Renovation and Sewer Line Replacement Project; and 2) Authorize staff to advertise for bids for this work. (Staff: Chris Ball) Item: 10.F. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Jessica Sandifer, Community Services Manager BY: Chris Ball, Senior Management Analyst DATE: 02/03/2021 Regular Meeting SUBJECT: Consider Plans and Specifications and Project Approval and Authorization to Advertise for Bids for the City Hall Administration Building Bathroom Renovation and Sewer Line Replacement Project SUMMARY Staff is recommending that City Council approve the plans and specifications for the Administration Building Bathroom Renovation and Sewer Line Replacement Project at City Hall, and authorize staff to advertise for bids on the project. BACKGROUND The City Hall Administration Building was constructed in 1988. It currently contains offices for various City departments and divisions, including the City Manager’s Department, Finance Department, Public Information, City Clerk, Human Resources, and Emergency Management. Over the years the plumbing for the building’s restrooms has required occasional maintenance. However, beginning in 2019 the maintenance issues became frequent and ultimately required the temporary closure of both the women and men’s facilities on more than one occasion. Upon further investigation it has been determined that corrosion and deterioration of the existing sewer line servicing the restroom facilities is the primary cause for the ongoing issues. DISCUSSION In 2019 staff hired a consultant to prepare plans and specifications for renovations to the Administration Building restrooms to replace the existing sewer line. The completed plans and specifications also address various improvements required by the Americans with Disabilities Act (ADA) and identified in the City’s ADA Transition Plan. The primary elements of the planned renovation include: Item: 10.F. 510 Honorable City Council 02/03/2021 Regular Meeting Page 2 • Replacing the existing deteriorated sewer line serving men and women’s restrooms with new underground pipe. • Replacing existing water closets, urinal and counter mounted restroom lavatories with new water saving plumbing fixtures that meet ADA requirements. • Layout modifications to provide ADA compliant clearances. • Electrical conduit and conductors for future installation of electric hand dryers. The project start will be dependent on public health conditions related to the current pandemic. Project approval at this time will provide staff the flexibility to bid the project and complete the work when conditions allow. The project duration is twenty working days from the notice to proceed, and the contractor will be required to complete disruptive tasks that generate significant noise and/or dust after work hours to avoid disturbing City Hall activities. FISCAL IMPACT The Engineer’s Estimate for the project is approximately $198,000. Funds for this project were not included in the City’s fiscal year (FY) 2020/21 budget. Staff will return to the City Council after bids have been received to request a budget amendment to allocate funding from the General Fund for this project. COUNCIL GOAL COMPLIANCE This action does not support a current strategic directive. STAFF RECOMMENDATION 1. Approve plans and specifications for Administration Building Bathroom Renovation and Sewer Line Replacement Project; and 2. Authorize staff to advertise for bids for this work. Attachment: Bidding documents including Plans and Specifications 511 12853-0019\2476738v1.doc CITY OF MOORPARK CONTRACT DOCUMENTS FOR ADMINISTRATION BUILDING BATHROOM RENOVATION AND SEWER LINE REPLACEMENT PROJECT IDENTIFICATION NO. P&R-2021-1 ATTACHMENT 512 -i- Richards, Watson & Gershon - 2020 82000-0016\1800815v4.doc NOTICE INVITING BIDS .......................................................................................................... 1 INSTRUCTIONS TO BIDDERS ............................................................................................... 3 CHECKLIST FOR BIDDERS .................................................................................................... 8 BID FORMS ............................................................................................................................. 9 CHECKLIST FOR EXECUTION OF CONTRACT .................................................................. 29 SAMPLE AGREEMENT ......................................................................................................... 30 SAMPLE INSURANCE FORMS ............................................................................................. 47 PAYMENT BOND (LABOR AND MATERIALS) ...................................................................... 51 PERFORMANCE BOND ........................................................................................................ 53 GENERAL PROVISIONS ....................................................................................................... 56 SPECIAL PROVISIONS ......................................................................................................... 81 APPENDICES: Appendix I – Scope of Work Appendix II – Architectural Plan Set Appendix III – Electrical Plan Set Appendix IV – Plumbing Plan Set Appendix V – City Holidays 513 12853-0019\2476738v1.doc -1- Richards, Watson & Gershon - 2020 NOTICE INVITING BIDS FOR Administration Building Bathroom Renovation and Sewer Line Replacement Project [the “Project”] Identification number: P&R-2021-1 NOTICE IS HEREBY GIVEN that the City of Moorpark, California (“City”) invites sealed Bids for the Project. The City will receive such Bids at the City Clerk’s office, City Hall, 799 Moorpark Ave., Moorpark, California 93021 up to the hour of 3:30 p.m. on the _____ day of ____________, 2021, at which time they will be publicly opened and read aloud. Bidders may attend the opening and reading of the bids virtually. Information on how to attend the opening shall be provided to prospective bidders via addendum. SCOPE OF WORK. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to renovate the restrooms to comply with Americans with Disability Act (ADA) and replace the sanitary sewer line in the Administration Building of Moorpark Civic Center, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City. OBTAINING BID DOCUMENTS. Bidders may obtain free copies of the Plans, Specifications and other Contract Documents online by visiting https://www.moorparkca.gov/bids. MANDATORY PRE-BID MEETING AND SITE VISIT. Mandatory pre-bid meeting/site visits will be held on [DAY] at the Moorpark City Hall, Administrative Services Building, 799 Moorpark Avenue, Moorpark. Due to COVID-19, we are limiting the number of people who can attend the mandatory meeting/site visit to one person per company, and requiring appointments. Appointment time slots are available at 9:00 a.m., 9:45 a.m. and 10:30 a.m. Bidders who intend to submit a proposal in response to this RFP must register with the City no later than [DAY] at [TIME] by emailing Administrative Assistant Kim Sexton at ksexton@moorparkca.gov. Registration emails should reference Project ID No. PR-2021-1 and include the following: • Contractor Name • Contractor Address • Primary Contact Name • Primary Contact Phone Number • Primary Contact Email Address • Preferred Meeting/Site Visit Time (9:00 a.m., 9:45 a.m. or 10:30 a.m.) No more than five persons can be accommodated in each time slot. Tour confirmations will be emailed to registered bidders on [DAY]. Bidders are to meet in front of the Administrative Service Building and await their appointment time. Masks are required to be worn during the site walk and social distancing is required. Every Bidder is required to attend the pre-bid meeting and Project site visit. Failure of a Bidder to attend will render that Bidder’s Bid non-responsive. No allowances for cost adjustments will be made if a Bidder fails to adequately examine the Project site before submitting a Bid. 514 12853-0019\2476738v1.doc -2- Richards, Watson & Gershon - 2020 REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS. In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)]. PREVAILING WAGES. In accordance with Labor Code Section 1770 et seq., the Project is a “public work.” The selected Bidder (Contractor) and any Subcontractors shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations (“DIR”) regarding the prevailing rate of per diem wages. Copies of those rates are on file , and are available to any interested party upon request. The Contractor shall post a copy of the DIR’s determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR. BONDS. Each Bid must be accompanied by a cash deposit, cashier’s check, certified check or Bidder’s Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid submitted. Personal or company checks are not acceptable. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverages, within fifteen (15) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law. LICENSES. Each Bidder shall possess a valid Class A or B Contractor’s license issued by the California State Contractors License Board at the time of the Bid submission. Additionally, each Bidder must have possessed a valid Class A or B Contractor’s license continuously for the prior five (5) years. The successful Contractor must also possess a current City business license or obtain one prior to start of the work. RETENTION SUBSTITUTION. Five percent (5%) of any progress payment will be withheld as retention. In accordance with Public Contract Code Section 22300, and at the request and expense of the Contractor, securities equivalent to the amount withheld may be deposited with the City or with a State or federally chartered bank as escrow agent, which shall then pay such moneys to the Contractor. Upon satisfactory completion of the Project, the securities shall be returned to the Contractor. Alternatively, the Contractor may request that the City make payments of earned retentions directly to an escrow agent at the Contractor’s expense. No such substitutions shall be accepted until all related documents are approved by the City. BIDDING PROCESS. The City reserves the right to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in its best interest. 515 12853-0019\2476738v1.doc -3- Richards, Watson & Gershon - 2020 INSTRUCTIONS TO BIDDERS FORM OF BID. Bids shall be made on the Bid forms found herein. Bidders shall include all forms and fill in all blank spaces, including inserting “N/A” (for not applicable) where necessary. Each Bid must be submitted in a sealed envelope bearing the Bidder’s name and addressed to the City Clerk with the Project name and identification number (as described in the Notice Inviting Bids) typed or clearly printed on the lower left corner of the envelope. DELIVERY OF BIDS. The Bid shall be delivered by the time and date, and to the place specified in the Notice Inviting Bids. No oral, faxed, emailed, or telephonic Bids or alternatives will be considered. The time of delivery shall be conclusively determined by the time-stamping clock located at the City Clerk’s office. Bidders are solely responsible for ensuring that their Bids are received in proper time, and Bidders assume all risks arising out of their chosen means of delivery. Any Bid received after the Bid submission deadline shall be returned unopened. Bidders are invited to be present for Bid opening. Accepted Bids shall become the property of the City. AMENDED BIDS. Unauthorized conditions, limitations or provisos attached to a Bid may cause the Bid to be deemed incomplete and non-responsive. WITHDRAWAL OF BID. A Bid may be withdrawn without prejudice upon written request by the Bidder filed with the City Clerk before the Bid submission deadline. Bids must remain valid and shall not be subject to withdrawal for sixty (60) Days after the Bid opening date. BIDDER’S SECURITY. Each Bid shall be accompanied by cash, a certified or cashier’s check payable to the City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as principal and an admitted surety insurer as Surety, in an amount not less than ten percent (10%) of the amount set forth in the Bid. The cash, check or Bid Bond shall be given as a guarantee that, if selected, the Bidder will execute the Contract in conformity with the Contract Documents, and will provide the evidence of insurance and furnish the specified Bonds, within fifteen (15) Days after the date of delivery of the Contract Documents to the Bidder. In case of the Bidder’s refusal or failure to do so, the City may award the Contract to the next lowest responsible bidder, and the cash, check, or Bond (as applicable) of the lowest Bidder shall be forfeited to the City to the extent permitted by law. No Bid Bond will be accepted unless it conforms substantially to the form provided in these Contract Documents. QUANTITIES APPROXIMATE. Any quantities shown in the Bid form or elsewhere herein shall be considered as approximations listed to serve as a general indication of the amount of Work or materials to be performed or furnished, and as basis for the Bid comparison. The City does not guarantee that the actual amounts required will correspond with those shown. As deemed necessary or convenient, the City may increase or decrease the amount of any item or portion of Work or material to be performed or furnished or omit any such item or portion, in accordance with the Contract Documents. ADDENDA. The City may, from time to time, issue Addenda to the Contract Documents. All addenda shall be posted on the project bid page, available at http://www.moorparkca.gov/Bids.aspx. Bidders are encouraged to register on the City’s bid page to be informed of addenda as they are posted. Bidders are responsible for ensuring that they have received any and all Addenda. Each Bidder is responsible for verifying that it has received all Addenda issued, if any. Bidders must acknowledge receipt of all Addenda, if any, in 516 12853-0019\2476738v1.doc -4- Richards, Watson & Gershon - 2020 their bids. Failure to acknowledge receipt of all Addenda may cause a Bid to be deemed incomplete and non-responsive. DISCREPANCIES IN BIDS. Each bidder shall set forth as to each item of Work, in clearly legible words and figures, a unit or line item Bid amount for the item in the respective spaces provided for this purpose. In case of discrepancy between the unit price and the extended amount set forth for the item, the unit price shall prevail. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or if the unit price is the same amount as the entry in the “extended amount” column, then the amount set forth in the “extended amount” column for the item shall prevail in accordance with the following: (1) As to lump sum items, the amount set forth in the “extended amount” column shall be the unit price. (2) As to unit price items, the amount set forth in the “extended amount” column shall be divided by the estimated quantity for the item set forth in the Bid documents, and the price thus obtained shall be the unit price. In case of discrepancy between words and figures, the words shall prevail. COMPETENCY OF BIDDERS. In evaluating Bidder responsibility, consideration will be given not only to the financial standing, but also to the general competency of the Bidder for the performance of the Project. Each Bidder shall set forth in the designated area of the Bid form a statement of its experience. No Contract will be executed with a Bidder that is not licensed and registered with the DIR in accordance with State law, and with any applicable specific licensing requirements specified in these Contract Documents. These licensing and registration requirements for Contractors shall also apply to all Subcontractors. BIDDER’S EXAMINATION OF SITE AND CONTRACT DOCUMENTS. Each Bidder must carefully examine the Project site and the entirety of the Contract Documents. Upon submission of a Bid, it will be conclusively presumed that the Bidder has thoroughly investigated the Work and is satisfied as to the conditions to be encountered and the character, quality, and quantities of Work to be performed and materials to be furnished. Upon Bid submission, it also shall be conclusively presumed that the Bidder is familiar with and agrees to the requirements of the Contract Documents, including all Addenda. No information derived from an inspection of records or investigation will in any way relieve the Contractor from its obligations under the Contract Documents nor entitle the Contractor to any additional compensation. The Contractor shall not make any claim against the City based upon ignorance or misunderstanding of any condition of the Project site or of the requirements set forth in the Contract Documents. No claim for additional compensation will be allowed which is based on a lack of knowledge of the above items. Bidders assume all risks in connection with performance of the Work in accordance with the Contract Documents, regardless of actual conditions encountered, and waive and release the City with respect to any and all claims and liabilities in connection therewith, to the extent permitted by law. TRADE NAMES OR EQUALS. Requests to substitute an equivalent item for a brand or trade name item must be made by written request submitted no later than the date specified in Section 4-6 of the General Provisions. Requests received after this time shall not be 517 12853-0019\2476738v1.doc -5- Richards, Watson & Gershon - 2020 considered. Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability. DISQUALIFICATION OF BIDDERS. No Person shall be allowed to make, file or be interested in more than one Bid for the Project, unless alternate Bids are specifically called for. A Person that has submitted a sub-bid to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other Bidders or from making a prime Bid. If there is a reason to believe that collusion exists among the Bidders, all affected Bids will be rejected. RETURN OF BID SECURITY. The successful Bidder’s Bid security shall be held until the Contract is executed. Bid security shall be returned to the unsuccessful Bidders within a reasonable time, which in any case shall not exceed sixty (60) Days after the successful Bidder has signed the Contract. AWARD OF CONTRACT. The City reserves the right to reject any or all Bids or any parts thereof or to waive any irregularities or informalities in any Bid or in the bidding. The Contract award, if made, will be to the lowest responsible, responsive Bidder and is anticipated to occur within sixty (60) Days after the Bid opening. The Contract award may be made after that period if the selected Bidder has not given the City written notice of the withdrawal of its Bid. DETERMINATION OF LOWEST BID. In accordance with Public Contract Code Section 20103.8, the lowest Bid shall be determined as follows: The lowest bid shall be the lowest bid price on the base contract without consideration of the prices on the additive or deductive items. TRENCHING. If the Project involves the construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five (5) feet deep or more, then each Bidder must submit, as a Bid item, adequate sheeting, shoring, and bracing, or an equivalent method, for the protection of life or limb, which shall conform to applicable safety orders. This final submission must be accepted by the City in advance of excavation and must include a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from caving ground during the excavation Work. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. LISTING SUBCONTRACTORS; SELF-PERFORMANCE. Each Bidder shall submit a list of the proposed Subcontractors on the Project, as required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100, et seq.). Contractor shall self-perform not less than 50% of the Work, in accordance with Section 3-2 of the Standard Specifications. EXECUTION OF CONTRACT. The selected Bidder shall execute the Contract in the form included in these Contract Documents within fifteen (15) Days from the date of delivery of the Contract Documents to the Bidder. Additionally, the selected Bidder shall also secure all insurance and Bonds as herein specified, and provide copies to the City, within fifteen (15) Days from the date of delivery of the Contract Documents to the Bidder. Failure or refusal to execute the Contract or to conform to any of the stipulated requirements shall be just cause for the annulment of the award and forfeiture of the Bidder’s security. In such event, the City may declare the Bidder’s security forfeited to the extent permitted by law, and the City may award the Contract to the next lowest responsible Bidder or may reject all bids. 518 12853-0019\2476738v1.doc -6- Richards, Watson & Gershon - 2020 NO COMPENSATION FOR COSTS INCURRED PRIOR TO CONTRACT EXECUTION. All costs incurred by the selected Bidder prior to Contract award and execution of the Contract by the City shall be at the Bidder’s sole risk. City shall have no liability for costs incurred prior to its execution of the Contract. SIGNATURES. The Bidder shall execute all documents requiring signatures, and shall cause to be notarized all documents that indicate such a requirement. Bids submitted as joint ventures must so state and be signed by each joint venturer. The Bidder shall provide evidence satisfactory to the City, such as an authenticated resolution of its board of directors, a certified copy of a certificate of partnership acknowledging the signer to be a general partner, or a power of attorney, indicating the capacity of the person(s) signing the Bid to bind the Bidder to the Bid and any Contract arising therefrom. Alternatively, Bids submitted by corporations must be executed as specified in Corporations Code Section 313, and Bids submitted by partnerships must be executed by all partners comprising the partnership. INSURANCE AND BONDS. The Contractor shall not begin Work until it has given the City evidence of all required insurance coverage (including all additional insured endorsements), a Bond guaranteeing the Contractor’s faithful performance of the Contract, and a Bond securing the payment of claims for labor and materials. TELEPHONES. Bidders are hereby notified that the City will not provide telephones for their use at the time of Bid submission. INTERPRETATION OF CONTRACT DOCUMENTS. Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the Project Representative a written request for an interpretation or correction not later than ten (10) Days before the Bid submissio n deadline. Requests for clarification received after this date will be disregarded. Please indicate the Project and identification number in the request for clarification. Telephonic requests will not be taken. Any interpretation or correction of the Contract Documents will be made only by a written Addendum. No oral interpretation of any provision in the Contract Documents shall be binding. TAXES. Except as may be otherwise specifically provided herein, all sales and/or use taxes assessed by federal, State or local authorities on materials used or furnished by the Contractor in performing the Work shall be paid by the Contractor. The Bidder shall calculate payment for all sales, unemployment, pension and other taxes imposed by federal, State, and local law and shall include these payments in computing the Bid. BID SUBMITTAL. Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Bidders and submitted in a sealed envelope plainly marked on the outside, ‘BID FOR ADMINISTRATION BUILDING RENOVATION AND SEWER LINE REPLACEMENT – DO NOT OPEN WITH REGULAR MAIL.” Bidders shall guarantee the bid price for a period of 90 calendar days from the date of bid opening. Any questions regarding this notice can be directed, in writing, to the City’s Project Representative: Chris Ball, Senior Management Analyst by e-mail at cball@moorparkca.gov 519 12853-0019\2476738v1.doc -7- Richards, Watson & Gershon - 2020 CHECKLIST FOR BIDDERS The following information is required of all Bidders at the time of Bid submission: ____ Completed and Signed Bid Cover Form ____ Completed and Signed Bid Sheets ____ Completed and Signed Questionnaire ____ Completed References Form ____ Resume of General Construction Superintendent/On-Site Construction Manager ____ Completed Subcontractor Designation Form ____ Completed and Signed Industrial Safety Record Form ____ Completed, Signed and Notarized Bid Bond or Other Security Form ____ Signed Noncollusion Declaration Form ____ Signed Environmental, Health and Safety Standards Compliance Form ____ Signed Workers’ Compensation Insurance Certificate ____ Evidence satisfactory to the City indicating the capacity of the person(s) signing the Bid to bind the Bidder Failure of the Bidder to provide all required information in a complete and accurate manner may cause the Bid to be considered non-responsive. 520 12853-0019\2476738v1.doc -8- Richards, Watson & Gershon - 2020 CITY OF MOORPARK BID COVER FORM ADMINISTRATION BUILDING RESTROOM RENOVATION AND SEWER LINE REPLACEMENT TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF MOORPARK: The undersigned, as Bidder, declares that: (1) this Bid is made without collusion with any other person and that the only persons or parties interested as principals are those named herein; (2) the undersigned has carefully examined the Contract Documents (including all Addenda) and the Project site; and (3) the undersigned has investigated and is satisfied as to the conditions to be encountered, the character, quality and quantities of Work to be performed, and the materials to be furnished. Furthermore, the undersigned agrees that submission of this Bid shall be conclusive evidence that such examination and investigation have been made and agrees, in the event the Contract be awarded to it, to execute the Contract with the City of Moorpark to perform the Project in accordance with the Contract Documents in the time and manner therein prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus and other means necessary so to do, except as may otherwise be furnished or provided under the terms of the Contract Documents, for the following stated unit prices or lump-sum price as submitted on the Bid herein. Bidder acknowledges receipt of all addenda, as follows*: Addendum No. _______________ Date: ____________________ Addendum No. _______________ Date: ____________________ Addendum No. _______________ Date: ____________________ Addendum No. _______________ Date: ____________________ *If there are more Addenda than spaces provided in the table above, attach another page acknowledging receipt of the additional Addenda. The undersigned submits as part of this Bid a completed copy of its Industrial Safety Record. This Safety Record includes all construction Work undertaken in California by the undersigned and any partnership, joint venture or corporation that any principal of the undersigned participated in as a principal or owner for the last five (5) calendar years and the current calendar year before the date of Bid submittal. Separate information is being submitted for each such partnership, joint venture, or corporate or individual Bidder. The undersigned may attach any additional information or explanation of data that it would like to be taken into consideration in evaluating the Safety Record. An explanation of the circumstances surrounding any and all fatalities is attached. Accompanying this Bid is cash, a cashier’s check, a certified check or a Bid Bond in an amount equal to at least ten percent (10%) of the total aggregate Bid price based on the quantities shown and the unit prices quoted. The undersigned further agrees that, should it be awarded the Contract and thereafter fail or refuse to execute the Contract and provide the required evidence of insurance and Bonds within fifteen (15) Days after delivery of the Contract to the 521 12853-0019\2476738v1.doc -9- Richards, Watson & Gershon - 2020 undersigned, then the cash, check or Bid Bond shall be forfeited to the City to the extent permitted by law. The undersigned certifies to have a minimum of five (5) consecutive years of current experience in the type of Work related to the Project and that this experience is in actual operation of the firm with permanent employees performing a part of the Work as distinct from a firm operating entirely by subcontracting all phases of the Work. The undersigned also certifies to be properly licensed by the State as a contractor to perform this type of Work. The undersigned possesses California Contractor’s License Number ____________________, Class _____, which expires on _______________________, and Department of Industrial Relations (DIR) Registration Number _________________________ which expires on _______________________. Bidder’s Name: ___________________________________________________ Signature: __________________________________ Title: ___________ Date: ______ Signature: __________________________________ Title: ___________ Date: ______ 522 12853-0019\2476738v1.doc -10- Richards, Watson & Gershon - 2020 CITY OF MOORPARK BID SHEETS FOR ADMINISTRATION BUILDING RESTROOM RENOVATION AND SEWER LINE REPLACEMENT Bidder’s Name: ____________________________________________________________ To the Honorable Mayor and Members of the City Council: In compliance with the Notice Inviting Bids, the undersigned hereby agrees to execute the Contract to furnish all labor, materials, equipment and supplies for the Project in accordance with the Contract Documents to the satisfaction and under the direction of the City, at the following prices: BASE AMOUNT: ITEM NO. DESCRIPTION UNIT QUANTITY EXTENDED AMOUNT 101 Restroom Renovations LS 1 $ 102 Sewer Line Replacement LS 1 $ TOTAL BASE AMOUNT $________________________ Note: Items may be adjusted or deleted. Therefore, regardless of total actual volume (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed. The City reserves the right to not use any of the estimated quantities; and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses. TOTAL BID PRICE IN DIGITS: $___________________________ TOTAL BID PRICE IN WORDS: _________________________________________________ Signature: __________________________________ Title: ___________ Date: ______ Signature: __________________________________ Title: ___________ Date: ______ 523 12853-0019\2476738v1.doc -11- Richards, Watson & Gershon - 2020 QUESTIONNAIRE FORM Fill out all of the following information. Attach additional sheets if necessary. (1) Bidder’s Name: (2) If the Bidder’s name is a fictitious name, who or what is the full name of the registered owner? If the Bidder’s name is not a fictitious name, write “N/A” in the response to this question. If you are doing business under a fictitious name, provide a copy of the filed valid Fictitious Business Name Statement. (3) Business Address: (4) Telephone: Facsimile: (5) Type of Firm – Individual, Partnership, LLC or Corporation: (6) Corporation organized under the laws of the State of: (7) California State Contractor’s License Number and Class: Original Date Issued: Expiration Date: (8) DIR Contractor Registration Number: (9) List the name and title of the person(s) who inspected the Project site for your firm: (10) List the name and title of the person(s) who attended the mandatory pre-Bid meeting and site visit for your firm: _____________________________ (11) Number of years’ experience the company has as a contractor in construction work: (12) List the names, titles, addresses and telephone numbers of all individuals, firm members, partners, joint venturers, and company or corporate officers having a principal interest in this Bid: (13) List all current and prior D.B.A.’s, aliases, and fictitious business names for any principal having interest in this Bid: 524 12853-0019\2476738v1.doc -12- Richards, Watson & Gershon - 2020 (14) List the dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this Bid: (15) For all arbitrations, lawsuits, settlements and the like (in or out of court) that the company or any principal having an interest in this Bid has been involved with in the past five (5) years: a. List the names, addresses and telephone numbers of contact persons for the parties: b. Briefly summarize the parties’ claims and defenses: c. State the tribunal (e.g., Superior Court, American Arbitration Association, etc.), the matter number, and the outcome: (16) Has the company or any principal having an interest in this Bid ever had a contract terminated by the owner or agency? If yes, explain. 525 12853-0019\2476738v1.doc -13- Richards, Watson & Gershon - 2020 (17) Has the company or any principal having an interest in this Bid ever failed to complete a project? If yes, explain. (18) Has the company or any principal having an interest in this Bid ever been terminated for cause, even if it was converted to a “termination of convenience”? If yes, explain. (19) For projects that the company or any principal having an interest in this Bid has been involved with in the last five (5) years, did you have any claims or actions: a. By you against the owner? Circle one: Yes No b. By the owner against you? Circle one: Yes No c. By any outside agency or individual for labor compliance? Circle one: Yes No d. By Subcontractors? Circle one: Yes No e. Are any of these claims or actions unresolved or outstanding? Circle one: Yes No If your answer is “yes” to any part or parts of this question, explain. (20) List the last three (3) projects you have worked on or are currently working on for the City of Moorpark: 526 12853-0019\2476738v1.doc -14- Richards, Watson & Gershon - 2020 Upon request of the City, the Bidder shall furnish evidence showing a notarized financial statement, financial data, construction experience, or other additional information. Failure to provide truthful answers to the questions above or in the following References Form may result in the Bid being deemed non-responsive. The Bidder certifies under penalty of perjury under the laws of the State of California that the information provided above is true and correct. Company Signature: Title: Date: Signature: Title: Date: 527 12853-0019\2476738v1.doc -15- Richards, Watson & Gershon - 2020 REFERENCES FORM For all public agency projects in excess of $15,000 that you are currently working on or have worked on in the past two (2) years, provide the following information: Project 1 Name/Number Project Description ___________________________________________________________ Approximate Construction Dates From: ______________ To: Agency Name: Contact Person: Telephone: Address: Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.). Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 2 Name/Number Project Description ___________________________________________________________ Approximate Construction Date From: ______________ To: Agency Name: Contact Person: Telephone: Address: Original Contract Amount: $ Final Contract Amount: $ 528 12853-0019\2476738v1.doc -16- Richards, Watson & Gershon - 2020 If final amount is different from original amount, please explain (change orders, extra work, etc.). Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 3 Name/Number Project Description ___________________________________________________________ Approximate Construction Dates From: ______________ To: Agency Name: Contact Person: Telephone: Address: Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.). Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 529 12853-0019\2476738v1.doc -17- Richards, Watson & Gershon - 2020 Project 4 Name/Number Project Description ___________________________________________________________ Approximate Construction Dates From: ______________ To: Agency Name: Contact Person: Telephone: Address: Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.). Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 5 Name/Number Project Description ___________________________________________________________ Approximate Construction Dates From: ______________ To: Agency Name: Contact Person: Telephone: Address: Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.). 530 12853-0019\2476738v1.doc -18- Richards, Watson & Gershon - 2020 Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 6 Name/Number Project Description ___________________________________________________________ Approximate Construction Dates From: ______________ To: Agency Name: Contact Person: Telephone: Address: Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.). Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 531 12853-0019\2476738v1.doc -19- Richards, Watson & Gershon - 2020 RESUME Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Project. 532 12853-0019\2476738v1.doc -20- Richards, Watson & Gershon - 2020 DESIGNATION OF SUBCONTRACTORS [Public Contract Code Section 4104] List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor’s total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor’s total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors. Name under which Subcontractor is Licensed and Registered CSLB License Number(s) and Class(es) DIR Contractor Registration Number Address and Phone Number Type of Work (e.g., Electrical) Percentage of Total Bid (e.g., 10%)* * The percentage of the total Bid shall represent the “portion of the work” for the purposes of Public Contract Code Section 4104(b). 533 12853-0019\2476738v1.doc -21- Richards, Watson & Gershon - 2020 INDUSTRIAL SAFETY RECORD FORM Bidder’s Name _______________________________________ Current Year of Record 2019 2018 2017 2016 2015 Total Number of contracts Total dollar amount of contracts (in thousands of dollars) Number of fatalities Number of lost workday cases Number of lost workday cases involving permanent transfer to another job or termination of employment The above information was compiled from the records that are available to me at this time and I declare under penalty of perjury under the laws of the State of California that the information is true and accurate within the limitations of those records. Signature: Title: Date: Signature: Title: Date: 534 12853-0019\2476738v1.doc -22- Richards, Watson & Gershon - 2020 Bond No. _________ BID BOND KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the City of Moorpark (“City”), has issued an invitation for Bids for the Work described as follows: Administration Building Restroom Renovation and Sewer Line Replacement Project WHEREAS (Name and address of Bidder) (“Principal”), desires to submit a Bid to City for the Work. WHEREAS, Bidders are required to furnish a form of Bidder’s security with their Bids. NOW, THEREFORE, we, the undersigned Principal, and (Name and address of Surety) (“Surety”), a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of Dollars ($ ), being not less than ten percent (10%) of the total Bid price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal is awarded the Contract for the Work by the City and, within the time and in the manner required by the bidding specifications, enters into the written form of Contract included with the bidding specifications, furnishes the required Bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials), and furnishes the required insurance coverage, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect. In case suit is brought upon this instrument, Surety further agrees to pay all court costs incurred by the City in the suit and reasonable attorneys’ fees in an amount fixed by the court. Surety hereby waives the provisions of Civil Code Section 2845. 535 12853-0019\2476738v1.doc -23- Richards, Watson & Gershon - 2020 IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated: “Principal” By: Its: By: Its: “Surety” By: Its: By: Its: Note: This Bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. 536 12853-0019\2476738v1.doc -24- Richards, Watson & Gershon - 2020 NONCOLLUSION DECLARATION FORM TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID [Public Contract Code Section 7106] The undersigned declares: I am the ______________________ of ____________________, the party making the foregoing Bid. The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham Bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham Bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, Bid depository, or to any member or agent thereof, to effectuate a collusive or sham Bid, and has not paid, and will not pay, any Person or entity for such purpose. Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ___________ [date], at ___________________________________________ [city], ______________________ [state]. Signature: Printed Name: Date: Signature: Printed Name: Date: 537 12853-0019\2476738v1.doc -25- Richards, Watson & Gershon - 2020 COMPLIANCE WITH ENVIRONMENTAL, HEALTH AND SAFETY STANDARDS TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID The Safe Drinking Water and Toxic Enforcement Act of 1986 (Proposition 65) prohibits employers from knowingly discharging or releasing a chemical known to the State of California to cause concern, birth defects or other reproductive harm into water or onto land where such chemical passes or, in all probability, will pass into any source of drinking water. Notwithstanding any provision in this Act exempting Contractor, Contractor hereby agrees to comply with all provisions of the Act relating to the discharge of hazardous chemicals on the job site. Contractor fully agrees that Contractor, Contractor’s employees and subcontractors shall not discharge such chemicals on the job site which will result in the discharge of such chemicals, and shall, upon completion of performance of all other duties under this contract, remove all supplies, materials and waste remaining on the job site which if exposed, could result in the discharge of such chemicals. Contractor shall be financially responsible for compliance with Proposition 65. Contractor shall also comply with state of California anti-smoking laws which, in part, prohibit smoking in the workplace and enclosed areas. Should Contractor, Contractor’s employees, or subcontractors or their employees fail to comply, within 24 hours from the time City issues and Contractor receives a written notice of noncompliance or within the time of an abatement period specified by any government agency, whichever period is shorter, City may give notice of default to Contractor, and at the City’s option, elect any and all rights or remedies set forth in this agreement. Approved by Contractor: _________________________________________________ Signature Title: ________________________________ Date: _____________________ 538 12853-0019\2476738v1.doc -26- Richards, Watson & Gershon - 2020 WORKERS’ COMPENSATION INSURANCE CERTIFICATE TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID Sections 1860 and 1861 of the California Labor Code require every contractor to whom a public works contract is awarded to sign and file with the awarding body the following statement: “I am aware of the Provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self - insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” By __________________________________________________________________ Title: ________________________________ Date: _____________________ 539 12853-0019\2476738v1.doc -27- Richards, Watson & Gershon - 2020 CHECKLIST FOR EXECUTION OF CONTRACT TO BE SUBMITTED BY SUCCESSFUL BIDDER: ____ Two (2) executed and notarized copies of the Contract _____ Payment Bond in amount of the Contract ____ Performance Bond in amount of the Contract ____ Workers’ Compensation Certificate ____ Liability insurance certificate in the amounts specified in the Contract Documents, naming the City as a co-insured ____ Automobile insurance certificate in the amount specified in the Contract Documents, naming the City as a co-insured ____ Additional insured endorsements (ongoing and completed operations) – comprehensive general liability ____ Additional insured endorsement – automobile liability ____ Additional insured endorsement – excess liability (if applicable) ____ Copy of City business license 540 12853-0019\2476738v1.doc -28- Richards, Watson & Gershon - 2020 SAMPLE AGREEMENT AGREEMENT BETWEEN THE CITY OF MOORPARK AND __________________________________ FOR ADMINISTRATION BUILDING RESTROOM RENOVATION AND SEWER LINE REPLACEMENT THIS AGREEMENT, executed as of this ____ day of _____________________, 2021, between the City of Moorpark, a municipal corporation (“City”) and ______________________, a ____________ (“Contractor”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: WHEREAS, City has the need for construction services related to Administration Building Restroom Renovation and Sewer Line Replacement; and WHEREAS, Contractor specializes in providing such services and has the proper work experience, certifications, and background to carry out the duties involved; and WHEREAS, on __________________, ____, the City Council of the City of Moorpark authorized the City Manager to enter into this Agreement after public bidding in accordance with California Public Contract Code Section 20160, et seq. NOW, THEREFORE, in consideration of the mutual covenants, benefits, and premises herein stated, the parties hereto agree as follows: 1. TERM The term of the Agreement shall be from the date of execution until completion of the work identified in the Scope of Services and in conformance with Exhibit _____, unless this Agreement is terminated or suspended consistent with Section 6 of this Agreement. 2. SCOPE OF SERVICES City does hereby retain Contractor in a contractual capacity to provide construction services related to administration building restroom renovation and sewer line replacement, as set forth in Exhibit _____: Contractor’s Bid Proposal, dated _____, which exhibit is attached hereto and incorporated herein by this reference as though set forth in full and hereinafter referred to as the “Proposal” and as set forth in Exhibit _____, which include (i) Standard Specifications; (ii) Special Provisions; (iii) Workers’ Compensation Insurance Certificate (Labor Code 1860 and 1861); (iv) Payment and Performance Bonds; and (v) Insurance Certificate for General Liability and Automobile Liability, attached hereto and incorporated herein by this reference as though set forth in full and hereinafter referred to as Exhibit_____. Where said Scope of Services as set forth in Exhibit _____ is modified by this Agreement, or in the event there is a conflict between the provisions of said Scope of Services and this Agreement, the language contained in this Agreement shall take precedence. Contractor shall perform the tasks described and set forth in Exhibit _____ and Exhibit _____. Contractor shall complete the tasks according to the schedule of performance which is also set forth in Exhibit _____. 541 12853-0019\2476738v1.doc -29- Richards, Watson & Gershon - 2020 Compensation for the services to be performed by Contractor shall be in accordance with Exhibit _____. Compensation shall not exceed the rates or total value of ____________ dollars ($_____) as stated in Exhibit _____, without a written amendment to the agreement executed by both parties. Payment by City to Contractor shall be as referred to in this Agreement. City and Contractor acknowledge that this project is a public work to which prevailing wages apply, and that a public work project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). Contractor agrees to comply with and be bound by all the terms, rules and regulations described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the DIR implementing such statutes, as though set forth in full herein, including any applicable amendments made thereto during the term of this Agreement. For every subcontractor who will perform work on this project, Contractor shall be responsible for subcontractor’s compliance with (a) and (b) and Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor Code Section 1725.5 requires all contractors and subcontractors to annually register with the DIR before bidding or performing on any public work contract. 3. PERFORMANCE Contractor shall at all times faithfully, competently, and to the best of Contractor’s ability, experience, and talent, perform all tasks described herein. Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Contractor hereunder in meeting its obligations under this Agreement. 4. MANAGEMENT The individual directly responsible for Contractor’s overall performance of the Agreement provisions herein above set forth and to serve as principal liaison between City and Contractor shall be ____________, and no other individual may be substituted without the prior written approval of the City Manager. The City’s contact person in charge of administration of this Agreement, and to serve as principal liaison between Contractor and City, shall be the City Manager or the City Manager’s designee. 5. PAYMENT The City agrees to pay Contractor monthly, in accordance with the terms and the schedule of payment as set forth in Exhibit _____, attached hereto and incorporated herein by this reference as though set forth in full, based upon actual time spent on the above tasks. This amount shall not exceed ____________ dollars ($_____) for the total term of the Agreement unless additional payment is approved as provided in this Agreement. Contractor shall not be compensated for any additional services rendered in connection with its performance of this Agreement, unless such additional services and compensation are authorized, in advance, in a written amendment to this Agreement executed by both parties. The City Manager, if authorized by City Council, may approve additional work not to exceed ten percent (10%) of the amount of the Agreement. 542 12853-0019\2476738v1.doc -30- Richards, Watson & Gershon - 2020 Contractor shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. If the City disputes any of Contractor’s fees it shall give written notice to Contractor within thirty (30) days of receipt of any disputed fees set forth on the invoice. Contractor shall provide appropriate documentation, as determined by the City, for all reimbursable expenses. 6. TERMINATION OR SUSPENSION WITHOUT CAUSE The City may at any time, for any reason, with or without cause, suspend, or terminate this Agreement, or any portion hereof, by serving upon the Contractor at least ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. The Contractor may terminate this Agreement only by providing City with written notice no less than thirty (30) days in advance of such termination. In the event of such termination, Contractor shall be compensated for such services up to the date of termination. Such compensation for work in progress shall be prorated as to the percentage of progress completed at the date of termination. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, the City may proceed in the manner set forth in Section 6-4 of the Greenbook. 7. DEFAULT OF CONTRACTOR The Contractor’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Contractor is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Contractor for any work performed after the date of default and can terminate this Agreement immediately by written notice to the Contractor. If such failure by the Contractor to make progress in the performance of work hereunder arises out of causes beyond the Contractor’s control, and without fault or negligence of the Contractor, it shall not be considered a default. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, he/she shall cause to be served upon the Contractor a written notice of the default. The Contractor shall have five (5) working days after service upon it of said notice in which to cure the default by rendering a satisfactory performance. In the event that the Contractor fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. 8. LIQUIDATED DAMAGES If the Contractor fails to complete the work, or any portion thereof, within the time period required by this Agreement or as duly extended in writing by the City Manager, Contractor shall 543 12853-0019\2476738v1.doc -31- Richards, Watson & Gershon - 2020 forfeit and pay to the City, as liquidated damages, the sum of one hundred twenty-five dollars ($125) per day for each calendar day the work, or portion thereof, remains uncompleted after the above specified completion date. Liquidated damages shall be deducted from any payments due or to become due to the Contractor under the terms of this Agreement [Government Code Sec. 53069.85]. Progress payments made by the City after the above specified completion date shall not constitute a waiver of liquidated damages by the City. 9. OWNERSHIP OF DOCUMENTS Contractor shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate to the performance of services under this Agreement. Contractor shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the representatives of City or its designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of ten (10) years after receipt of final payment. Upon completion of, or in the event of termination or suspension of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Contractor. With respect to computer files, Contractor shall make available to the City, at the Contractor’s office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files. 10. INDEMNIFICATION AND HOLD HARMLESS Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsels’ fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Contractor's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both City and Contractor, or should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsels fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive 544 12853-0019\2476738v1.doc -32- Richards, Watson & Gershon - 2020 as is permitted by the law of the state of California and will survive termination of this Agreement. Contractor obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this agreement, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. In the event Contractor fails to obtain such indemnity obligations from others as required here, Contractor agrees to be fully responsible according to the terms of this Section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns, or heirs of Contractor and shall survive the termination of this Agreement or Section. This Indemnity shall survive termination of the Agreement or Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other Contract Documents or Agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or apply any monies to the Contractor under this Agreement for the purpose of resolving such claims; provided, however, City may release such funds if the Contractor provides City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in its sole discretion, determine whether such assurances are reasonable. 11. INSURANCE Contractor shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. 12. INDEPENDENT CONTRACTOR Contractor is and shall at all times remain as to the City a wholly independent Contractor. The personnel performing the services under this Agreement on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, or agents, except as set forth in this Agreement. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Contractor 545 12853-0019\2476738v1.doc -33- Richards, Watson & Gershon - 2020 shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner. No employee benefits shall be available to Contractor in connection with the performance of this Agreement. Except for the fees paid to Contractor as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Contractor for performing services hereunder for City. City shall not be liable for compensation or indemnification to Contractor for injury or sickness arising out of performing services hereunder. 13. LEGAL RESPONSIBILITIES The Contractor shall keep itself informed of local, state, and federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws and regulations, including but not limited to the Americans with Disabilities Act and Occupational Safety and Health Administration laws and regulations. The City and Contractor shall comply with Exhibit B, California Public Contract Code Section 9204, when applicable. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Contractor to comply with this Section. 14. ANTI DISCRIMINATION Neither the Contractor, nor any subcontractor under the Contractor, shall discriminate in employment of persons upon the work because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of such person; or any other basis protected by applicable federal, state, or local law, except as provided in Section 12940 of the Government Code. The Contractor shall have responsibility for compliance with this Section, if applicable [Labor Code Section 1735]. 15. UNDUE INFLUENCE Contractor declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of the City in connection with the award, terms, or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City will receive compensation, directly or indirectly from Contractor, or any officer, employee, or agent of Contractor, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a material breach of this Agreement entitling the City to any and all remedies at law or in equity. 16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Project during his/her tenure or for one (1) year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Project performed under this Agreement. 546 12853-0019\2476738v1.doc -34- Richards, Watson & Gershon - 2020 17. CONFLICT OF INTEREST Contractor covenants that neither they nor any officer or principal of their firm have any interests, nor shall they acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of their services hereunder. Contractor further covenants that in the performance of this Agreement, they shall employ no person having such interest as an officer, employee, agent, or subcontractor. Contractor further covenants that Contractor has not contracted with nor is performing any services directly or indirectly, with the developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, now or within the past one (1) year, and further covenants and agrees that Contractor and/or its subcontractors shall provide no service or enter into any contract with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, while under contract with the City and for a one (1) year time period following termination of this Agreement. 18. NOTICE Any notice to be given pursuant to this Agreement shall be in writing, and all such notices and any other document to be delivered shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the party for whom intended as follows: To: City Manager City of Moorpark 799 Moorpark Ave. Moorpark, CA 93021 To: ____________ ____________ ____________ ____________ Either party may, from time to time, by written notice to the other, designate a different address or contact person, which shall be substituted for the one above specified. Notices, payments and other documents shall be deemed delivered upon receipt by personal service or as of the third (3rd) day after deposit in the United States mail. 19. CHANGE IN NAME Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected in the Agreement documents. 20. ASSIGNMENT Contractor shall not assign this Agreement or any of the rights, duties, or obligations hereunder. It is understood and acknowledged by the parties that Contractor is uniquely qualified to perform the services provided for in this Agreement. 547 12853-0019\2476738v1.doc -35- Richards, Watson & Gershon - 2020 21. LICENSES At all times during the term of this Agreement, Contractor shall have in full force and effect, all licenses required of it by law for the performance of the services in this Agreement. 22. VENUE AND GOVERNING LAW This Agreement is made, entered into, and executed in Ventura County, California, and any action filed in any court or for arbitration for the interpretation, enforcement or other action of the terms, conditions, or covenants referred to herein shall be filed in the applicable court in Ventura County, California. The City and Contractor understand and agree that the laws of the state of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. 23. ENTIRE AGREEMENT This Agreement contains the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations, and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material. 24. CAPTIONS OR HEADINGS The captions and headings of the various Articles, Paragraphs, Sections, and Exhibits of this Agreement are for convenience and identification only and shall not be deemed to limit or define the content of the respective Articles, Paragraphs, Sections, and Exhibits hereof. 25. AMENDMENTS Any amendment, modification, or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by both parties to this Agreement. 26. TIME OF COMPLETION City and Contractor agree that time is of the essence in this Agreement. City and Contractor further agree that Contractor’s failure to perform on or at the times set forth in this Agreement will damage and injure City, but the extent of such damage and injury is difficult or speculative to ascertain. Consequently, City and Contractor agree that any failure to perform by Contractor at or within the times set forth herein shall result in liquidated damages as defined in this Agreement for each and every day such performance is late. City and Contractor agree that such sum is reasonable and fair. Furthermore, City and Contractor agree that this Agreement is subject to Government Code Section 53069.85 and that each party hereto is familiar with and understands the obligations of said Section of the Government Code. 27. PRECEDENCE Contractor is bound by the contents of City’s Bid Package and Proposal, Exhibit _____ attached hereto and incorporated herein by this reference as though set forth in full. In the event 548 12853-0019\2476738v1.doc -36- Richards, Watson & Gershon - 2020 of conflict, the requirements of the City’s Bid Package and this Agreement shall take precedence over those contained in the Proposal. 28. INTERPRETATION OF AGREEMENT Should interpretation of this Agreement, or any portion thereof, be necessary, it is deemed that this Agreement was prepared by the parties jointly and equally, and shall not be interpreted against either party on the ground that the party prepared the Agreement or caused it to be prepared. 29. WAIVER No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding unless executed in writing by the party making the waiver. 30. AUTHORITY TO EXECUTE The person or persons executing this Agreement on behalf of the Contractor warrants and represents that he/she has the authority to execute this Agreement on behalf of the Contractor and has the authority to bind Contractor to the performance of obligations hereunder. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK [CONTRACTOR] _____________________________ _____________________________ Troy Brown, City Manager [NAME], [TITLE] Attest: _____________________________ Ky Spangler, City Clerk 549 12853-0019\2476738v1.doc -37- Richards, Watson & Gershon - 2020 EXHIBIT A INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of the Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth here, it will be amended to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to City in excess of the limits and coverage required in this Agreement and which is applicable to a given loss, will be available to the City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Commercial General Liability Insurance shall be provided by an Insurance Services Office “Commercial General Liability” policy form CG 00 01 or the exact equiva lent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits shall be no less than $1,000,000 per occurrence for all covered losses and no less than $2,000,000 general aggregate. Contractor’s policy shall contain no endorsements limiting coverage beyond the basic policy coverage grant for any of the following: a. Explosion, collapse or underground hazard (XCU) b. Products and completed operations c. Pollution liability d. Contractual liability Coverage shall be applicable to City for injury to employees of contractors, subcontractors, or others involved in the project. Policy shall be endorsed to provide a separate limit applicable to this project. Workers’ Compensation Workers’ Compensation insurance shall be provided on a state-approved policy form providing statutory benefits as required by law with employers’ liability limits no less than $1,000,000 per accident for all covered losses. Business Auto Coverage Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 06 92 including symbol 1 (Any Auto) or the exact equivalent shall be provided. Limits shall be no less than $1,000,000 per accident, combined single limit. If Contractor owns no vehicles, this requirement may be satisfied by a non-owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos in any way on 550 12853-0019\2476738v1.doc -38- Richards, Watson & Gershon - 2020 this project, Contractor shall provide evidence of personal auto liability coverage for each such person. Excess or Umbrella Liability Excess or Umbrella Liability insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to City for injury to employees of contractor, subcontractors, or others involved in the Work. The scope of coverage provided is subject to the approval of city following receipt of proof of insurance as required herein. Limits are subject to review. Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the state of California and with A.M. Best rating of A- or better and a minimum financial size of VII. Contractor and City agrees as follows: 1. Contractor agrees to endorse the third party general liability coverage required herein to include as additional insureds City, its officials, employees, agents, using standard ISO endorsement No. CG 2010 and No. CG 2037 with edition acceptable to the City. Contractor also agrees to require all contractors, subcontractors, and anyone else involved in any way with the project contemplated by this Agreement to do likewise. 2. Any waiver of subrogation express or implied on the part of the City to any party involved in this Agreement or related documents applies only to the extent of insurance proceeds actually paid. City, having required that it be named as an additional insured to all insurance coverage required herein, expressly retains the right to subrogate against any party for sums not paid by insurance. For its part, Contractor agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors, subcontractors, or others involved in any way with the project contemplated by this Agreement to do likewise. 3. All insurance coverage maintained or procured by Contractor or required of others by Contractor pursuant to this Agreement shall be endorsed to delete the subrogation condition as to the city, or to specifically allow Contractor or others providing insurance herein to waive subrogation prior to a loss. This endorsement shall be obtained regardless of existing policy wording that may appear to allow such waivers. 4. It is agreed by Contractor and City that insurance provided pursuant to these requirements is not intended by any party to be limited to providing coverage for the vicarious liability of City, or to the supervisory role, if any, of City. All insurance coverage provided pursuant to this or any other Agreement (express or implied) in any way relating to City is intended to apply to the full extent of the policies involved. Nothing referred to here or contained in any agreement involving City in relation to the project contemplated by this Agreement is intended to be construed to limit the application of insurance coverage in any way. 551 12853-0019\2476738v1.doc -39- Richards, Watson & Gershon - 2020 5. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 6. All coverage types and limits required are subject to approval, modification, and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discover period) that may affect City’s protection without City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of binders of coverage, or endorsements, or certificates of insurance, shall be delivered to City at or prior to the execution of this Agreement. In the event such proof of insurance is not delivered as required, or in the event such insurance is canceled or reduced at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Agreement and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at City option. 8. Contractor agrees to endorse, and to required others to endorse, the insurance provided pursuant to these requirements, to require 30 days notice to City and the appropriate tender prior to cancellation or reduction of such liability coverage and notice of any material alteration or non-renewal of any such coverage, and to require contractors, subcontractors, and any other party in any way involved with the project contemplated by this Agreement to do likewise. 9. It is acknowledged by the parties of this Agreement that all insurance coverage required to be provided by Contractor or any subcontractor, and any other party involved with the project who is brought onto or involved in the project by Contractor, is intended to apply first and on a primary non-contributing basis in relation to any other insurance or self insurance available to the City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Contractor agrees that upon request, all agreements with subcontractors and others engaged in this project will be submitted to City for review. 11. Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, architect, engineer, or other entity or person in any way involved in the performance of Work on the project contemplated by this Agreement to self-insure its obligations to City. If Contractor’s existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving the Contractor 90 days advance 552 12853-0019\2476738v1.doc -40- Richards, Watson & Gershon - 2020 written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to City. 13. For purposes of applying insurance coverage only, all contracts pertaining to the project will be deemed to be executed when finalized and any activity commences in furtherance of performance under this Agreement. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard. 15. Contractor will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuance to this Agreement. This obligation applies whether or not the Agreement is canceled or terminated for any reason. The insurance shall include but not be limited to products and completed operations and discontinued operations, where applicable. Termination of this obligation is not effective until City executes a written statement to that effect. 16. Contractor agrees to waive its statutory immunity under any workers’ compensation statute or similar statute, in relation to the City, and to require all subcontractors and any other person or entity involved in the project contemplated by this Agreement to do likewise. 17. Requirements of specific coverage features are not intended as limitations on other requirements or as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be all-inclusive. 18. Any provision in any of the construction documents dealing with the insurance coverage provided pursuant to these requirements, is subordinate to and superseded by the requirements contained herein. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties to be interpreted as such. 19. All liability coverage provided according to these requirements must be endorsed to provide a separate aggregate limit for the project that is the subject of this Agreement and evidencing products and completed operations coverage for not less than two years after issuance of a final certificate of occupancy by all appropriate government agencies or acceptance of the completed work by City. 20. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. 553 12853-0019\2476738v1.doc -41- Richards, Watson & Gershon - 2020 21. Contractor agrees to obtain and provide to City a copy of Professional Liability coverage for Architects or Engineers on this project, when required by City. City shall determine the liability limit. 554 12853-0019\2476738v1.doc -42- Richards, Watson & Gershon - 2020 EXHIBIT B PUBLIC CONTRACT CODE SECTION 9204 9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section: (1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following: (i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. (v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority. (4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. 555 12853-0019\2476738v1.doc -43- Richards, Watson & Gershon - 2020 (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor 556 12853-0019\2476738v1.doc -44- Richards, Watson & Gershon - 2020 may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2027, deletes or extends that date. (Amended by Stats. 2019, Ch. 489, Sec. 1. (AB 456) Effective January 1, 2020. Repealed as of January 1, 2027, by its own provisions.) 557 12853-0019\2476738v1.doc -45- Richards, Watson & Gershon - 2020 SAMPLE INSURANCE FORMS 558 12853-0019\2476738v1.doc -46- Richards, Watson & Gershon - 2020 559 12853-0019\2476738v1.doc -47- Richards, Watson & Gershon - 2020 560 12853-0019\2476738v1.doc -48- Richards, Watson & Gershon - 2020 561 12853-0019\2476738v1.doc -49- Richards, Watson & Gershon - 2020 Bond No. __________ PAYMENT BOND (LABOR AND MATERIALS) KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the City of Moorpark (“City”), State of California, has awarded to (“Principal”) (Name and address of Contractor) a contract (the “Contract”) for the Work described as follows: ADMINISTRATION BUILDING RESTROOM RENOVATON AND SEWER LINE REPLACEMENT (Project name) WHEREAS, under the terms of the Contract, the Principal is required before entering upon the performance of the Work, to file a good and sufficient payment Bond with the City to secure the claims to which reference is made in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code. NOW, THEREFORE, we, the undersigned Principal, and (Name and address of Surety) (“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City and all contractors, subcontractors, laborers, material suppliers, and other persons employed in the performance of the Contract and referred to in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code in the penal sum of Dollars ($ ), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this Work or labor, that the Surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this Bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by City in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered. It is hereby expressly stipulated and agreed that this Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this Bond. Upon expiration of the time within which the California Labor Commissioner may serve a civil wage and penalty assessment against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1741, and upon expiration of the time within which a joint labor management committee may commence an action against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to 562 12853-0019\2476738v1.doc -50- Richards, Watson & Gershon - 2020 Labor Code Section 1771.2, if the condition of this Bond be fully performed, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect. The Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or the Specifcations accompanying the same shall in any manner affect its obligations on this Bond, and it does hereby waive notice of any such change, extension, alteration, or addition. IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated: “Principal” By: Its By: Its (Seal) “Surety” By: Its By: Its (Seal) Note: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE BEFORE DATE OF CONTRACT. Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located. 563 12853-0019\2476738v1.doc -51- Richards, Watson & Gershon - 2020 Bond No. __________ PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the City of Moorpark (“City”), has awarded to (“Principal”) (Name and address of Contractor) a contract (the “Contract”) for the Work described as follows: ADMINISTRATION BUILDING RESTROOM RENOVATION AND SEWER LINE REPLACEMENT (Project name) WHEREAS, Principal is required under the terms of the Contract to furnish a Bond for the faithful performance of the Contract. NOW, THEREFORE, we, the undersigned Principal, and , (Name and address of Surety) (“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of Dollars ($ ), this amount being not less than the total Contract Price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors executors and administrators, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Contract and any alteration thereof made as therein provided, on the Principal’s part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void one year after the recordation of the Notice of Completion; otherwise, it shall be and remain in full force and effect. As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. Surety hereby waives any statute of limitations as it applies to an action on this Bond. The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or of the Work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations under this Bond, 564 12853-0019\2476738v1.doc -52- Richards, Watson & Gershon - 2020 and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the specifications. Surety hereby waives the provisions of California Civil Code Sections 2845 and 2849. The City is the principal beneficiary of this Bond and has all rights of a party hereto. IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated: “Principal” By: Its By: Its (Seal) “Surety” By: Its By: Its (Seal) Note: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE BEFORE DATE OF CONTRACT. Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located. 565 12853-0019\2476738v1.doc -53- Richards, Watson & Gershon - 2020 PLEASE PROVIDE CONTACT INFORMATION FOR THE SURETY AND THE BROKER IN THE SPACE PROVIDED BELOW SURETY – Contact Information __________________________________________ Attn:_______________________________________ Address:___________________________________ City State Zip_______________________________ Phone #:___________________________________ BROKER – Contact Information _______________________________________ Attn:___________________________________ Address:________________________________ City State Zip ____________________________ Phone# ________________________________ 566 12853-0019\2476738v1.doc -54- Richards, Watson & Gershon - 2020 GENERAL PROVISIONS SECTION 0. GENERAL PROVISIONS DEFINED 0-1 STANDARD SPECIFICATIONS The 2018 edition of “Standard Specifications for Public Works Construction” (“Standard Specifications”), as amended by the Contract Documents, is incorporated into the Contract Documents by this reference. The Work described herein shall be done in accordance with the provisions of the Standard Specifications, as amended by the Contract Documents. 0-2 NUMBERING OF SECTIONS The number of sections and subsections in these General Provisions are compatible with the numbering in the Standard Specifications. 0-3 SUPPLEMENTATION OF STANDARD SPECIFICATIONS The Sections that follow supplement, but do not replace, the corresponding provisions in Part 1 (General Provisions) of the Standard Specifications, except as otherwise indicated herein. In the event of any conflict between the Standard Specifications and these General Provisions, these General Provisions shall control. SECTION 1. GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-2 TERMS AND DEFINITIONS Whenever in the Standard Specifications or in the Contract Documents the following terms are used, they shall be understood to mean the following: Agency – The City of Moorpark. Board – The City Council of the City of Moorpark. Contract Documents – As defined in Standard Specifications Section 1-2, but also including these General Provisions. Engineer – The City Engineer, acting either directly or through properly authorized agents. Such agents shall act within the scope of the particular duties entrusted to them. Inspector – An authorized representative of the City, assigned by the City to make inspections of Work performed by or materials supplied by the Contractor. Laboratory – A laboratory authorized by the City to test materials and Work involved in the Contract. Notice of Completion – The notice authorized by Civil Code Section 9204. Project – See Work. 567 12853-0019\2476738v1.doc -55- Richards, Watson & Gershon - 2020 Submittal – Any drawing, calculation, specification, product data, samples, manuals, requests for substitutes, spare parts, photographs, survey data, traffic control plans, record drawings, Bonds or similar items required to be submitted to the City under the terms of the Contract. 1-3.3 Institutions The institutions listed in Section 1-3.3 of Part 1 of the Standard Specifications shall be supplemented by the list below: Abbreviation Word or Words AAN ................................................................................... American Association of Nurserymen AGCA ....................................................................... Associated General Contractors of America APWA ................................................................................... American Public Works Association CRSI ..................................................................................... Concrete Reinforcing Steel Institute CSI ........................................................................................ Construction Specifications Institute NEC ........................................................................................................... National Electric Code NFPA .................................................................................... National Fire Protection Association SSS ........................................................................... State of California Standard Specifications, Latest edition, Department of Transportation SSP ....................................................................................... State of California Standard Plans, Latest edition, Department of Transportation 1-7.2 CONTRACT BONDS The Faithful Performance Bond shall remain in force until one year after the date of recordation of the Notice of Completion. The Material and Labor Bond shall remain in force until expiration of the time within which the California Labor Commissioner may serve a civil wage and penalty assessment against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1741, and until the expiration of the time within which a joint labor management committee may commence an action against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1771.2. All Bonds must be submitted using the required forms, which are in the Contract Documents, or on any other form approved by the City Attorney. SECTION 2. SCOPE OF THE WORK 2.2 PERMITS Before starting any construction work, the Contractor will be required to obtain all necessary permits from the City, which may include obtaining a no fee encroachment permit for Work within the public right-of-way, as well as all other permits required from all other agencies. Should this Project require construction of trenches or excavations which are five (5) feet or deeper and into which a person is required to descend, the Contractor shall obtain a Cal/OSHA permit and furnish the City with a copy before Work can commence on this Project. Contractor shall bear all cost for fees for all agencies except for the City’s permit f ees. 568 12853-0019\2476738v1.doc -56- Richards, Watson & Gershon - 2020 2.4 COOPERATION AND COLLATERAL WORK The Contractor shall be responsible for coordinating all Work with the City’s street sweeping, trash pick-up, and street maintenance contractors, emergency services departments, utility companies’ crews, and others when necessary. Payment for conforming to these requirements shall be included in other items of Work, and no additional payment shall be made thereof. 2-5.4 Haul Routes Subsection 2-5.4 of Part 1 of the Standard Specifications shall be deleted and replaced as follows: The Contractor must obtain the City’s approval before using any haul routes. Further detail requirements for haul traffic are delineated in the Special Provisions. 2-7 CHANGES INITIATED BY THE AGENCY 2-7.1 General. The City reserves the right, without notice to the Surety, to increase or decrease the quantity of any item or portion of the Work described in the Contract Documents or to alter or omit portions of the Work so described, as may be deemed necessary or expedient by the City, without in any way making the Contract void. Such increases, alterations or decreases of Work shall be considered and treated as though originally contracted for, and shall be subject to all the terms, conditions and provisions of the original Contract. The Contractor shall not claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease, alteration or omission of any kind of Work to be done. 2-8 EXTRA WORK New and unforeseen work will be classified as Extra Work only when the Work is not covered and cannot be paid for under any of the various items or combination of items for which a Bid price appears on the Bid. The Contractor shall not do any Extra Work except upon written order from the City. SECTION 3. CONTROL OF THE WORK 3-1 ASSIGNMENT Any purported assignment without written consent of the City shall be null, void, and of no effect, and the Contractor shall hold harmless, defend and indemnify the City and its officers, officials, employees, agents and representatives with respect to any claim, demand or action arising from or relating to any unauthorized assignment. If the City opts to consent to assignment, the City’s consent shall be contingent upon: (1) a letter from the Surety agreeing to the assignment and assigning all of the Bonds to the assignee without any reduction, or the assignee supplying all new Bonds in the amounts originally required under the Contract Documents; and (2) the assignee supplying all of the required insurance in the amounts required in the Contract Documents. Until the Surety assigns all of the Bonds or the assignee supplies all of the new Bonds, and until the assignee supplies all of 569 12853-0019\2476738v1.doc -57- Richards, Watson & Gershon - 2020 the required insurance, an assignment otherwise consented to in writing by the City shall not be effective. Even if the City consents to assignment, no assignment shall relieve the Contractor of liability under the Contract. 3-5 INSPECTION The Contractor shall arrange and pay for all off-site inspection of the Work required by any ordinance or governing authorities. The Contractor shall also arrange and pay for other inspections, including tests in connection therewith, as may be assigned or required. 3.7 CONTRACT DOCUMENTS 3-7.1 General In addition to the requirements under Section 3-7.1 in the Standard Specifications, the Contractor shall maintain a control set of Plans and Specifications on the Project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on the control set to show the as-built conditions. This control set of Plans shall also be edited for all Addenda, Requests for Information, Change Orders, field changes not involving cost, and any other variation that occurred during construction. Upon completion of all Work, the Contractor shall return the control set to the City. Final payment will not be made until this requirement is met. Where a work feature is shown on the drawings or identified in the Specifications but is not specifically indicated as an item in the Bid sheets, and there is no ambiguity regarding the requirement to construct, install, or construct and install that work feature, the Contractor is required to complete the work feature. All costs to the Contractor for constructing, installing, or both constructing and installing such a work feature shall be included in the Bid. 3-7.2 Precedence of the Contract Documents With regard to Section 3-7.2 in the Standard Specifications, the order of precedence shall be as follows: 1. Permits issued by regulatory agencies with jurisdiction. 2. Change Orders and Supplemental Agreements, whichever occurs last. 3. Contract/Agreement. 4. Addenda. 5. Notice Inviting Bids. 6. Instructions to Bidders. 7. Bid/Proposal. 8. Special Provisions. 9. General Provisions. 10. Plans. 11. Standard Plans. 12. Standard Specifications. 13. Reference Specifications. 570 12853-0019\2476738v1.doc -58- Richards, Watson & Gershon - 2020 3-9 SUBSURFACE DATA If the City or its consultants have made investigations of subsurface conditions in areas where the Work is to be performed, such investigations shall be deemed made only for the purpose of study and design. If a geotechnical or other report has been prepared for the Project, the Contractor may inspect the records pertaining to such investigations subject to and upon the conditions hereinafter set forth. The inspection of the records shall be made in the office of the City Engineer. It is the Contractor’s sole responsibility to determine whether such investigations exist, and the City makes no affirmative or negative representation concerning the existence of such investigations. The records of any such investigations are made available solely for the convenience of the Contractor. It is expressly understood and agreed that the City, the City Engineer, their agents, consultants or employees assume no responsibility whatsoever with respect to the sufficiency or accuracy of any investigations, the records thereof, and the interpretations set forth therein. No warranty or guarantee is expressed or implied that the conditions indicated by any such investigations or records are representative of those existing in the Project area. The Contractor agrees to make such independent investigations and examination as necessary to be satisfied of the conditions to be encountered in the performance of the Work. The Contractor represents that it has studied the Plans, Specifications and other Contract Documents, and all surveys and investigation reports of subsurface and latent physical conditions, has made such additional surveys and investigations as necessary for the performance of the Work at the Contract Price in accordance with the requirements of the Contract Documents, and that it has correlated the results of all such data with the requirements of the Contract Documents. No claim of any kind shall be made or allowed for any error, omission or claimed error or omission, in whole or in part, of any geotechnical exploration or any other report or data furnished or not furnished by the City. 3-10 SURVEYING 3-10.1 General The Contractor shall verify all dimensions on the drawings and shall report to the City any discrepancies before proceeding with related Work. The Contractor shall perform all survey and layout Work per the benchmark information on the Project Plans. All surveying Work must conform to the Professional Land Surveyors’ Act (Business and Professions Code Section 8700 et seq). All Project surveying notes and “cut-sheets” are to be provided to the City after the completion of each surveying activity and all final surveying notes shall be provided before final payment to the Contractor. Construction stakes shall be set and stationed by Contractor at its expense. Unless otherwise indicated in the Special Provisions, surveying costs shall be included in the price of items bid. No separate payment will be made. Re-staking and replacement of construction survey markers damaged as a result of the Work, vandalism, or accident shall be at the Contractor’s expense. 571 12853-0019\2476738v1.doc -59- Richards, Watson & Gershon - 2020 3-11 CONTRACT INFORMATION SIGNS The names, addresses and specialties of the Contractor, Subcontractors, architects or engineers may not be displayed on any signage within the public right-of-way. This signage prohibition includes advertising banners hung from truck beds or other equipment. 3-12 WORKSITE MAINTENANCE 3-12.1 General. Clean-up shall be done as Work progresses at the end of each day and thoroughly before weekends. The Contractor shall not allow the Work site to become littered with trash and waste material, but shall maintain the same in a neat and orderly condition throughout the construction operation. Materials which need to be disposed shall not be stored at the Project site, but shall be removed by the end of each Working Day. If the job site is not cleaned to the satisfaction of the City, the cleaning will be done or contracted by the City and shall be back-charged to the Contractor and deducted from the Contract Price. The Contractor shall promptly remove from the vicinity of the completed Work, all rubbish, debris, unused materials, concrete forms, construction equipment, and temporary structures and facilities used during construction. Final acceptance of the Work by the City will be withheld until the Contractor has satisfactorily complied with the foregoing requirements for final clean-up of the Project site. 3.12.4 Storage of Equipment and Materials. 3-12.4.1 General The Contractor shall make arrangements for storing its equipment and materials. The Contractor shall make its own arrangements for any necessary off-site storage or shop areas necessary for the proper execution of the Work. Approved areas within Work site may be used for temporary storage; however, the Contractor shall be responsible for obtaining any necessary permits from the City. In any case, the Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way or on any section where traffic is restricted at any time. The Contractor shall deliver, handle, and store materials in accordance with the manufacturer’s written recommendations and by methods and means that will prevent damage, deterioration, and loss including theft. Delivery schedules shall be controlled to minimize long-term storage of products at the Project site and overcrowding of construction spaces. In particular, the Contractor shall provide delivery and installation coordination to ensure minimum holding or storage times for materials recognized to be flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other sources of loss. Storage shall be arranged to provide access for inspection. The Contractor shall periodically inspect to assure materials are undamaged and are maintained under required conditions. All costs associated with the clean-up and storage required to complete the Project shall be the sole responsibility of the Contractor. 572 12853-0019\2476738v1.doc -60- Richards, Watson & Gershon - 2020 3-12.4.2 Storage in Public Streets The first sentence of Section 3-12.4.2 shall not be incorporated and shall instead be replaced with the following: Construction materials and equipment shall not be stored in Streets, roads, or highways unless otherwise specified in the Special Provisions or approved by the City. 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY 3-13.1 Completion. The Contractor shall complete all Work under the Contract within twenty (20) Working Days from the Notice to Proceed. 3-13.2 Acceptance The Project will not be considered complete and ready for City Council direction to staff regarding recordation of the Notice of Completion until all required Work is completed, the Work site is cleaned up in accordance with Section 3-12 of Part 1 of the Standard Specifications and the Special Provisions, and all of the following items have been received by the City: 1. A form of Notice of Completion, with all information required by the California Civil Code; 2. All written guarantees and warranties; 3. Evidence that the Performance Bond has been extended and will remain in effect for the period specified in Section 1-7.2 of the Standard Specifications, as modified by these General Provisions; 4. All “as-builts”; 5. Duplicate copies of all operating instructions and manufacturer’s operating catalogs and data, together with such field instructions as necessary to fully instruct City personnel in correct operation and maintenance procedures for all equipment installed listed under the electrical, air conditioning, heating, ventilating and other trades. This data and instructions shall be furnished for all equipment requiring periodic adjustments, maintenance or other operation procedures. The Contractor shall allow at least seven (7) Working Days’ notice for final inspection. Such notice shall be submitted to the City in writing. 3-13.3 Warranty For the purposes of the calculation of the start of the warranty period, the Work shall be deemed to be completed upon the date of recordation of the Notice of Completion. If that direction is contingent on the completion of any items remaining on a punchlist, the Work shall be deemed to be completed upon the date of the City’s acceptance of the final item(s) on that punchlist. The Contractor shall repair or replace defective materials and workmanship as required in this Section 3-13.3 at its own expense. Additionally, the Contractor agrees to defend, indemnify and 573 12853-0019\2476738v1.doc -61- Richards, Watson & Gershon - 2020 hold the City harmless from claims of any kind arising from damage, injury or death due to such defects. The parties agree that no certificate given shall be conclusive evidence of the faithful performance of the Contract, either in whole or in part, and that no payment shall be construed to be in acceptance of any defective Work or improper materials. Further, the certificate or final payment shall not terminate the Contractor’s obligations under the warranty herein. The Contractor agrees that payment of the amount due under the Contract and the adjustments and payments due for any Work done in accordance with any alterations of the same, shall release the City, the City Council and its officers and employees from any and all claims or liability on account of Work performed under the Contract or any alteration thereof. SECTION 4. CONTROL OF MATERIALS 4-1 GENERAL The Contractor and all Subcontractors, suppliers, and vendors shall guarantee that the Work will meet all requirements of this Contract as to the quality of materials, equipment, and workmanship. 4-4 TESTING Except as elsewhere specified, the City shall bear the cost of testing materials and workmanship that meet or exceed the requirements indicated in the Standard Specifications and the Special Provisions. The cost of all other tests, including the retesting of material or workmanship that fails to pass the first test, shall be borne by the Contractor. 4-6 TRADE NAMES If the Contractor requests to substitute an equivalent item for a brand or trade name item, the burden of proof as to the comparative quality and suitability of alternative equipment or articles or materials shall be upon the Contractor, and the Contractor shall furnish, at its own expense, all information necessary or related thereto as required by the City. All requests for substitution shall be submitted, together with all documentation necessary for the City to determine equivalence, no later than ten (10) days before the bid submission deadline, unless a different deadline is listed in the Special Provisions. SECTION 5. LEGAL RELATIONS AND RESPONSIBILITIES 5-3 LABOR 5-3.1 Public Work The Contractor acknowledges that the Project is a “public work” as defined in Labor Code Section 1720 et seq. (“Chapter 1”), and that this Project is subject to (a) Chapter 1, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the Director of Industrial Relations (“DIR”) implementing such statutes. The Contractor shall perform all Work on the Project as a public work. The Contractor shall comply with and be bound by all the terms, rules and regulations described in (a) and (b) as though set forth in full herein. 574 12853-0019\2476738v1.doc -62- Richards, Watson & Gershon - 2020 5-3.2 Copies of Wage Rates Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Project are on file at City Hall and will be made available to any interested party on request. By initiating any Work, the Contractor acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and the Contractor shall post such rates at each job site covered by these Contract Documents. The Contractor shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty paid to the City, forfeit two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to these Contract Documents by the Contractor or by any Subcontractor. 5-3.3 Payroll Records The Contractor shall comply with and be bound by the provisions of Labor Code Section 1776, which requires the Contractor and each Subcontractor to (1) keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776, (2) certify and make such payroll records available for inspection as provided by Section 1776, and (3) inform the City of the location of the records. The Contractor has ten (10) days in which to comply subsequent to receipt of a written notice requesting these records, or as a penalty to the City, the Contractor shall forfeit one hundred dollars ($100) for each Day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. The Contractor and each Subcontractor shall comply with and be bound by the provisions of Labor Code Section 1771.4(a)(3), which requires that each Contractor and each Subcontractor shall furnish the records specified in Section 1776 directly to the Labor Commissioner at least monthly, in a format prescribed by the Labor Commissioner. 5-3.4 Hours of Labor The Contractor acknowledges that eight (8) hours labor constitutes a legal day’s work. The Contractor shall comply with and be bound by Labor Code Section 1810. The Contractor shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty paid to the City, forfeit twenty-five dollars ($25) for each worker employed in the performance of this Project by the Contractor or by any Subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one (1) calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code Section 1815, work performed by employees of the Contractor in excess of eight (8) hours per day, and forty (40) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one-half (1-1/2) times the basic rate of pay. 575 12853-0019\2476738v1.doc -63- Richards, Watson & Gershon - 2020 5-3.5 Apprentices The Contractor shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6 and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. The Contractor shall be responsible for compliance with these Sections for all apprenticeable occupations. Before commencing Work on this Project, the Contractor shall provide the City with a copy of the information submitted to any applicable apprenticeship program. Within sixty (60) Days after concluding Work, Contractor and each of its Subcontractors shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Contract. 5-3.6 Debarment or Suspension The Contractor shall not perform Work with any Subcontractor that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. The Contractor and Subcontractors shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. If the Contractor or any Subcontractor becomes debarred or suspended during the duration of the Project, the Contractor shall immediately notify the City. 5-3.7 Registration with the DIR In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5. 5-3.8 Compliance Monitoring and Posting Job Sites This Project is subject to compliance monitoring and enforcement by the DIR. The Contractor shall post job site notices, as prescribed by regulation. 5-3.9 Subcontractors For every Subcontractor who will perform Work on the Project, the Contractor shall be responsible for such Subcontractor’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and the Contractor shall include in the written Contract between it and each Subcontractor a copy of the provisions in this Section 5-3 of the General Provisions and a requirement that each Subcontractor shall comply with those provisions. The Contractor shall be required to take all actions necessary to enforce such contractual provisions and ensure Subcontractor’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the Subcontractor and upon becoming aware of the failure of the Subcontractor to pay its workers the specified prevailing rate of wages. The Contractor shall diligently take corrective action to halt or rectify any failure. 576 12853-0019\2476738v1.doc -64- Richards, Watson & Gershon - 2020 5-3.10 Prevailing Wage Indemnity To the maximum extent permitted by law, the Contractor shall indemnify, hold harmless and defend (at the Contractor’s expense with counsel reasonably acceptable to the City) the City, its officials, officers, employees, agents and independent contractors serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed in Section 5-3 of the General Provisions by any Person (including the Contractor, its Subcontractors, and each of their officials, officers, employees and agents) in connection with any Work undertaken or in connection with the Contract Documents, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of the Contractor under this Section 5-3.10 shall survive expiration or termination of the Contract. 5-4 INSURANCE 5-4.1 General The first paragraph of Section 5-4.1 of Part 1 of the Standard Specifications shall not be incorporated and shall instead be replaced with the following: The Contractor shall provide and maintain insurance naming the City, its elected and appointed officials, officers, employees, attorneys, agents, volunteers, and independent contractors in the role of City officials as insureds or additional insureds regardless of any inconsistent statement in the policy or any subsequent endorsement whether liability is attributable to the Contractor or the City. The insurance provisions shall not be construed to limit the Contractor’s indemnity obligations contained in the Contract. The City will not be liable for any accident, loss or damage to the Work prior to completion, except as otherwise specified in Section 6-5. 5-4.2 General Liability Insurance The Contractor shall at all times during the term of the Contract carry, maintain, and keep in full force and effect the insurance referenced in Section 5-4 of Part 1 of the Standard Specifications, as modified below. 5-4.2.1 Additional Insureds The City, its elected and appointed officials, officers, employees, attorneys, agents, volunteers, and independent contractors in the role of City officials, shall be the insured or named as additional insureds covering the Work, regardless of any inconsistent statement in the policy or any subsequent endorsement, whether liability is attributable to the Contractor or the City. 5-4.2.2 No Limitation on Indemnity The insurance provisions shall not be construed to limit the Contractor’s indemnity obligations contained in these Contract Documents. 577 12853-0019\2476738v1.doc -65- Richards, Watson & Gershon - 2020 5-4.2.3 Replacement Insurance The Contractor agrees that it will not cancel, reduce or otherwise modify the insurance coverage. The Contractor agrees that if it does not keep the required insurance in full force and effect, and such insurance is available at a reasonable cost, the City may take out the necessary insurance and pay the premium thereon, and the repayment thereof shall be deemed an obligation of the Contractor and the cost of such insurance may be deducted, at the option of the City, from payments due the Contractor. This shall be in addition to all other legal options available to the City to enforce the insurance requirements. 5-4.2.4 Certificates of Insurance with Original Endorsements The Contractor shall submit to the City certificates of insurance with the original endorsements, both of which reference the same policy number, for each of the insurance policies that meet the insurance requirements, not less than one (1) day before beginning of performance under the Contract. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. Endorsements may be executed on standard Insurance Services Office (ISO) forms, samples of which are provided in the Contract Documents, or on any other form that contains substantially the same terms and is approved by the City’s Risk Manager. In any case, the endorsements must specifically name the City of Moorpark and its elected and appointed officials, officers, employees, attorneys, agents, volunteers, and independent contractors in the role of City officials as insureds or additional insureds. Current insurance certificates and endorsements shall be kept on file with the City at all times during the term of this Contract. The City reserves the right to require complete, certified copies of all required insurance policies at any time. 5-4.2.5 Subcontractors The Contractor shall require each of its Subcontractors that perform services under the Contract to maintain insurance coverage that meets all of the requirements of this Section 5-4. 5-4.5 Insurance Requirements not Limiting If the Contractor maintains broader coverage and/or higher limits than the minimums required in this Section 5-4, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 5.7 SAFETY 5-7.8 Steel Plate Covers 5-7.8.1 General The Contractor shall cover all openings, trenches and excavations at the end of each Work Day with steel plate covers. 578 12853-0019\2476738v1.doc -66- Richards, Watson & Gershon - 2020 Section 5-8 is hereby added to Section 1 of Part 1 of the Standard Specifications, as follows: 5-8 INDEMNIFICATION The following indemnity provisions shall supersede the indemnity in Section 5-4.1 of the Standard Specifications. 5-8.1 Contractor’s Duty. To the fullest extent permitted by law, the Contractor shall, at its sole cost and expense, defend, hold harmless and indemnify the City and its elected officials, officers, attorneys, agents, employees, volunteers, successors, assigns and those City agents serving as independent contractors in the role of City officials (collectively “Indemnitees”), from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, stop payment notices, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith and the payment of all consequential damages (collectively “Liabilities”), in law or equity, whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of the Contractor, its officers, agents, servants, employees, Subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or individual for whom the Contractor bears legal liability) in the performance of the Contract, including the Indemnitees’ active or passive negligence, except for Liabilities arising from the sole negligence or willful misconduct of the Indemnitees, as determined by court decision or by the agreement of the Parties. The Contractor shall defend the Indemnitees in any action or actions filed in connection with any Liabilities with counsel of the Indemnitees’ choice, and shall pay all costs and expenses, including all attorneys’ fees and experts’ costs actually incurred in connection with such defense. The Contractor shall reimburse the Indemnitees for any and all legal expenses and costs incurred by Indemnitees in connection therewith. The City shall not be liable for any accident, loss, or damage to the Work prior to completion, except as otherwise specified in Section 6-5. 5-8.1.1 Taxes and Workers’ Compensation. The Contractor shall pay all required taxes on amounts paid to the Contractor under the Contract, and indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by the Contract. The Contractor shall fully comply with the Workers’ Compensation law regarding the Contractor and the Contractor’s employees. The Contractor shall indemnify and hold the City harmless from any failure of the Contractor to comply with applicable Workers’ Compensation laws. The City may offset against the amount of any fees due to the Contractor under the Contract any amount due to the City from the Contractor as a result of the Contractor’s failure to promptly pay to the City any reimbursement or indemnification arising under this Subsection 5-8.1.1. 5-8.1.2 Subcontractor Indemnity Agreements. The Contractor shall obtain executed indemnity agreements with provisions identical to those in this Section 5-8 from each and every Subcontractor or any other person or entity involved by, for, with or on behalf of the Contractor in the performance of the Contract. If the Contractor fails to obtain such indemnity obligations, the Contractor shall be fully responsible and indemnify, hold harmless and defend the Indemnitees from and against any and all Liabilities at law or in 579 12853-0019\2476738v1.doc -67- Richards, Watson & Gershon - 2020 equity, whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of the Contractor’s Subcontractor, its officers, agents, servants, employees, Subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or individual for whom the Contractor’s Subcontractor bears legal liability) in the performance of the Contract, including the Indemnitees’ active or passive negligence, except for Liabilities arising from the sole negligence or willful misconduct of the Indemnitees, as determined by final court decision or by the agreement of the Parties. 5-8.2 Workers’ Compensation Acts not Limiting. The Contractor’s indemnifications and obligations under this Section 5-8, or any other provision of the Contract, shall not be limited by the provisions of any Workers’ Compensation act or similar act. The Contractor expressly waives its statutory immunity under such statutes or laws as to the City, its officers, agents, employees and volunteers. 5-8.3 Insurance Requirements not Limiting. The City does not, and shall not, waive any rights that it may possess against the Contractor because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to the Contract. The indemnities in this Section 5-8 shall apply regardless of whether or not any insurance policies are determined to be applicable to the Liabilities, tax, assessment, penalty or interest asserted against the City. 5-8.4 Civil Code Exception. Nothing in this Section 5-8 shall be construed to encompass Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Contract is subject to Civil Code Section 2782(a) or the City’s active negligence to the limited extent that the underlying Contract Documents are subject to Civil Code Section 2782(b), provided such sole negligence, willful misconduct or active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. 5-8.5 Nonwaiver of Rights. Indemnitees do not and shall not waive any rights that they may possess against the Contractor because the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to these Contract Documents. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. 5-8.6 Waiver of Right of Subrogation. The Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all Claims arising out of or incident to the activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent or subsequent active or passive negligence by Indemnitees. 5-8.7 Survival of Terms. The Contractor’s indemnifications and obligations under this Section 5-8 shall survive the 580 12853-0019\2476738v1.doc -68- Richards, Watson & Gershon - 2020 expiration or termination of the Contract, are intended to be as broad and inclusive as is permitted by the law of the State, and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against the Contractor shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision. 5-9 RECYCLING OF MATERIALS Subsection 5-9 is hereby added to the Standard Specifications as follows: 5-9.1 Construction and Demolition Ordinance The City of Moorpark has adopted a Construction and Demolition (C&D) ordinance requiring all demolition and city-sponsored projects, regardless of cost; new construction projects valued over $500,000; or renovation projects valued over $100,000 to divert a minimum of 65% of material generated during the project from disposal in a landfill (through reuse or recycling). The City has created a Construction and Demolition Materials Management Plan (C&DMMP) form to assist applicants to meet these diversion requirements. You will be required to submit a Diversion Security Deposit of 3% of the project valuation to the City to ensure compliance with the ordinance. The deposit will be returned upon verification that you met the 65% diversion requirement. Also, a one-time fee for staff time associated with processing your C&D plan will be charged. You have two options to meet this requirement. You may use the City’s franchised hauler (Waste Management) who can provide temporary bins and will dispose of your waste at a City authorized facility. Or you may self-haul your waste to a city authorized certified C&D processing facility. If you self-haul your waste you must use proper hauling vehicles and bins owned by your company and those vehicles must be driven by your employees. Please remember that because this project is a prevailing wage project, the driver of the self-haul vehicle will need to be paid a prevailing wage rate for driving the C&D materials to the authorized facility. You will need to submit itemized weigh tickets from each facility documenting your C&D recycling and disposal that indicates the weight and type of material recycled or disposed. These weigh tickets will need to be turned in to the Solid Waste Division and verified prior to final payment release for the job and refund of your C&D diversion security deposit. If diversion requirements are not met, the City will retain the deposit. Please contact the Solid Waste Division at 805-517-6241 with questions about the C&D ordinance or about how to obtain the forms and documentation requirements. SECTION 6. PROSECUTION AND PROGRESS OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK 6-1.1 Construction Schedule One (1) week before the scheduled pre-construction meeting, the Contractor must submit to the City for review and approval the construction schedule required by the first paragraph of Section 6-1.1. The Contractor shall make revisions as required by the City. The schedule must account for all subcontract work, as well as the work of the Contractor, submittals, coordination with the other contractors performing concurrent work and the Traffic Control Plan. The Contractor shall update this Construction Schedule when directed by the City, or when: 581 12853-0019\2476738v1.doc -69- Richards, Watson & Gershon - 2020 a. A Change Order significantly affects the Contract completion date or the sequence of construction approach or activities; or b. The actual sequence of the Work, or the planned sequence of the Work, is changed and does not conform to the Contractor’s current accepted Project construction schedule. The Contractor shall submit an updated construction schedule with its monthly invoice every month. Progress payments shall be contingent upon the receipt of monthly updated construction schedules. 6-1.1.1 Pre-Construction Conference Approximately ten (10) Days before the commencement of Work at the site, a pre-construction conference will be held at the City and shall be attended by the Contractor’s Project manager, its on-site field superintendent, and any Subcontractors that the Contractor deems appropriate. Attendance by the Contractor and any Subcontractors designated is mandatory. Contractor shall submit its twenty-four (24) hour emergency telephone numbers to the City for approval a minimum of two (2) Working Days before the pre-construction conference. Unless previously submitted to the City, the Contractor shall bring to the pre-construction conference copies of each of the following: 1) Construction Schedule. 2) Procurement schedule of major equipment and materials and items requiring long lead time. 3) Shop drawing/sample submittal schedule. 4) Preliminary schedule of values (lump sum price breakdown) for progress payment purposes. 5) Written designation of the on-site field superintendent and the Project manager. Both daytime and emergency telephone numbers shall be included in the written designation. The purpose of the conference is to designate responsible personnel and establish a working relationship. The parties will discuss matters requiring coordination and establish procedures for handling such matters. The complete agenda will be furnished to the Contractor before the meeting date. The Contractor shall be prepared to discuss all of the items listed below. 1) The Contractor’s construction schedule. 2) Notification of local residents before starting any Work and keeping them informed throughout the Project. 3) Procedures for transmittal, review, and distribution of the Contractor’s submittals. 4) Processing applications for payment. 5) Maintaining record documents. 6) Critical Work sequencing. 7) Maintaining sewage service during construction, including proposed by-passes. 8) NPDES requirements, if any. 9) Field decisions and Change Orders. 10) Use of Project site, office and storage areas, security, housekeeping, and the City’s needs. 11) Major equipment deliveries and priorities. 582 12853-0019\2476738v1.doc -70- Richards, Watson & Gershon - 2020 12) Traffic control. 13) Any other item that the City representative states is relevant to the meeting. 6-1.1.2 Weekly Progress Meetings Progress meetings will be held each week during the course of the Project. The meeting location, day of the week and time of day will be mutually agreed to by the City and the Contractor. The Contractor shall provide a two (2) week “look ahead” schedule for each meeting. The construction manager will preside at these meetings and will prepare the meeting agenda, meeting minutes and will distribute minutes to all persons in attendance. As the Work progresses, if it is determined by agreement of the attendees, that weekly meetings are not necessary, the weekly progress meetings may be changed to bi-weekly progress meetings. 6-1.2 Commencement of the Work The Contractor shall not begin any construction activity at the site before the issuance of the Notice to Proceed. Any Work that is done by the Contractor in advance of the Notice to Proceed shall be considered as being done at the Contractor’s own risk and responsibility, and as a consequence will be subject to rejection. Section 6-1.3 is hereby added to Section 6 of Part 1 of the Standard Specifications, as follows: 6-1.3 Working Days And Hours The Contractor shall do all Work between the hours of 8 a.m. to 5 p.m., Monday through Friday, with the exception of any tasks that generate a significant amount of noise, dust or other disruption to City Hall activities. Such tasks shall be performed in their entirety, including site cleanup, outside of City Hall working hours, with advance written approval from the City. No Work will be allowed on Sunday, or City holidays, which are as follows: (see Appendix V). A permit may have other hours or Days for the Contractor to do the Work, and those hours and Days shall supersede any hours and Days written in this Section. Whenever the Contractor is permitted or directed to perform night Work or to vary the period during which Work is performed during the Working Day, the Contractor shall give twelve (12) hours’ notice to the City so that inspection may be provided. A charge may be made to the Contractor for approved overtime or weekend inspections requested by the Contractor. 6-4 DELAYS AND EXTENSIONS OF TIME 6-4.1 General. Unless otherwise agreed in writing, an adjustment to the Contract time by reason of a Change Order shall be agreed to at the time the Change Order is issued and accepted by Contractor. If the Change Order does not reserve the right of the parties, or either of them, to seek an adjustment to the Contract time, then the parties forever relinquish and waive such right and there shall be no further adjustments to the Contract time. No extension of time will be granted for any event, including pandemics, leading to the issuance of a “stay at home” or similar kind of order by any local, State, or federal governmental authority, 583 12853-0019\2476738v1.doc -71- Richards, Watson & Gershon - 2020 if the Work has been deemed, either by emergency order or proclamation, or operation of law, to be an essential service that is exempt from such stay at home or similar order. 6-4.2 Extensions of Time In the event it is deemed appropriate by the City to extend the time for completion of the Work, any such extension shall not release any guarantee for the Work required by the Contract Documents, nor shall any such extension of time relieve or release the Sureties on the Bonds executed. In executing such Bonds, the Sureties shall be deemed to have expressly agreed to any such extensions of time. The amount of time allowed by an extension of time shall be limited to the period of the delay giving rise to the same as determined by the City. Notwithstanding any dispute which may arise in connection with a claim for adjustment of the Contract time, the Contractor shall promptly proceed with the Work. 6-4.3 Payment for Delays Notwithstanding any other terms and conditions of the Contract Documents, the City shall have no obligation whatsoever to increase the Contract Price or extend the time for delays. Unless compensation and/or markup is agreed upon by the City, the Contractor agrees that no payment of compensation of any kind shall be made to the Contractor for damages or increased overhead costs caused by any delays in the progress of the Contract, whether such delays are avoidable or unavoidable or caused by any act or omission of the City or its agents. Any accepted delay claim shall be fully compensated for by an extension of time to complete the performance of the Work. This Section shall not apply to compensable delays caused solely by the City. If a compensable delay is caused solely by the City, the Contractor shall be entitled to a Change Order that: (1) extends the time for completion of the Contract by the amount of delay caused by the City; and (2) provides equitable adjustment, as determined by the City, to the Contractor. 6-8 TERMINATION OF THE CONTRACT FOR CONVENIENCE The following sentence is added to Section 6-8: In no event (including termination for impossibility or impracticability, due to conditions or events beyond the control of the City, for any other reason or for no reason) shall the total amount of money to Contractor exceed the amount which would have been paid to Contractor for the full performance of the services described in the Contract. 6-9 LIQUIDATED DAMAGES For the purposes of the calculation of the start of the liquidated damages, the Work shall be deemed to be completed when the same has been completed in accordance with the Plans and Specifications therefor and to the satisfaction of the City, and the City has certified such completion in accordance with Section 3-13.1 of Part 1 of the Standard Specifications. 584 12853-0019\2476738v1.doc -72- Richards, Watson & Gershon - 2020 SECTION 7. MEASUREMENT AND PAYMENT 7.3 PAYMENT 7.3.1 General The unit and lump sum prices to be paid shall constitute full compensation for all labor, equipment, materials, tools and incidentals required to complete the Project as outlined in these Contract Documents and as directed by the City. In accordance with Public Contract Code Section 7107, if no claims have been filed and are still pending, the amount deducted from the final estimate and retained by the City will be paid to the Contractor except such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be withheld for any other lawful purposes. 7-3.2 Partial and Final Payment 7-3.2.1 Monthly Closure Date and Invoice Date For purposes of Section 7-3.2, the monthly closure date shall be the last Day of each month. A measurement of Work performed and a progress estimate of the value thereof based on the Contract and of the monthly payment shall be prepared by the Contractor and submitted to the City before the tenth (10th) Day of the following month for verification and payment consideration. 7-3.2.2 Payments The City shall make payments within thirty (30) Days after receipt of the Contractor’s undisputed and properly submitted payment request, including an updated construction schedule pursuant to Section 6-1.1 of the General Provisions. The City shall return to the Contractor any payment request determined not to be a proper payment request as soon as practicable, but not later than seven (7) Days after receipt, and shall explain in writing the reasons why the payment request is not proper. 7-3.2.3 Retention The City shall withhold not less than five percent (5%) from each progress payment. However, at any time after fifty percent (50%) of the Work has been completed, if the City Council finds that satisfactory progress is being made, it may, at its discretion, make any of the remaining progress payments in full for actual Work completed. The City shall withhold not less than five percent (5%) of the Contract Price from the Final Payment Amount (defined in Section 7-3.2.4) until at least thirty-five (35) days after recordation of the Notice of Completion, or recordation of a notice of acceptance or cessation, but not later than the period permitted by Public Contract Code Section 7107. 7-3.2.4 Final Invoice and Payment Whenever the Contractor shall have completely performed the Contract in the opinion of the City’s Project Manager, the Project Manager shall notify the City Clerk that the Contract has been completed in its entirety. The Contractor shall then submit to the Project Manager a written statement of the final quantities of Contract items for inclusion in the final invoice. Upon receipt of such statement, the Project Manager shall check the quantities included therein and 585 12853-0019\2476738v1.doc -73- Richards, Watson & Gershon - 2020 shall authorize a payment amount, which in the Project Manager’s opinion shall be just and fair, covering the value of the total amount of Work done by the Contractor, less all previous payments and all amounts to be retained under the provisions of the Contract Documents (“Final Payment Amount”). The Project Manager shall then request that the City accept the Work and that the City Clerk be authorized to file, on behalf of the City in the office of the County Recorder, a Notice of Completion of the Work herein agreed to be done by the Contractor. In addition, the final payment will not be released until the Contractor returns the control set of Plans and Specifications showing the redlined as-built conditions. 7-3.2.5 Substitute Security In accordance with Public Contract Code Section 22300, the Contractor may request that it be permitted to substitute securities in lieu of having retention withheld by the City from progress payments when such payments become due or, in the alternative, the Contractor may request that the City make payments of earned retentions directly to an agreed upon designated escrow agent at the Contractor’s expense. If the Contractor selects either one of these alternatives, the following shall control. 7.3.2.5.1 Substitution of Securities for Performance Retention At some reasonable time before any progress payment would otherwise be due and payable to the Contractor in the performance of Work under these Contract Documents, the Contractor may submit a request to the City in writing to permit the substitution of retentions with securities equivalent to the amount estimated by the City (“estimated amount of retention”) to be withheld. The Contractor shall deposit such securities with the City or may, in the alternative, deposit such securities in escrow with a State or federally chartered bank in California, as the escrow agent, at the Contractor’s expense. Such securities will be the equivalent or greater in value of the estimated amount of retention. If the Contract is modified by written Modifications or Change Orders or the Contractor otherwise becomes entitled to receive an amount more than the Contract Price at the time the securities are deposited, the Contractor shall, at the request of the City, deposit with the City or escrow agent, whichever is applicable, additional securities within a reasonable time so that the amount of securities on deposit with the City or escrow agent is equivalent or greater in value than the amount of retention the City would otherwise be entitled to withhold from progress payments due or to become due to the Contractor as the Work progresses. The City shall withhold any retention amount that exceeds the security amount until the additional securities are deposited and, if the deposit is with an escrow agent, the City has confirmation from that escrow agent of the new total value of securities. Upon satisfactory completion of the Contract, which shall mean, among other things, that the City is not otherwise entitled to retain proceeds from progress payments as elsewhere provided in the Contract or under applicable law, the securities shall be returned to the Contractor. The City shall, within its sole discretion, determine whether the amount of the securities on deposit with the City or escrow agent is equal to or greater than the amount of estimated retention of progress payments that could otherwise be held by the City if the Contractor had not elected to substitute same with securities. 7-3.2.5.2 Deposit of Retention Proceeds with an Escrow Agent As an alternative to the substitution of securities, as provided above, or the City otherwise retaining and holding retention proceeds from progress payments, the Contractor may request the City to make payments of retentions earned directly to an escrow agent with the same qualifications as required in Section 7-3.2.5.1 above and at the expense of the Contractor. At its 586 12853-0019\2476738v1.doc -74- Richards, Watson & Gershon - 2020 sole expense, the Contractor may direct the investment of such retention payments into only such securities as mentioned in Section 7-3.2.5.4 below and shall be entitled to interest earned on such investments on the same terms provided for securities deposited by the Contractor. Upon satisfactory completion of the Contract, which shall mean when the City would not otherwise be entitled to withhold retention proceeds from progress payments had the Contractor not elected to have such proceeds deposited into escrow, the Contractor shall be allowed to receive from the escrow agent all securities, interest and payments deposited into escrow pursuant to the terms of this Section. The Contractor shall pay to each Subcontractor, not later than ten (10) Days of receipt of payment, the respective amount of interest earned, net of costs attributed to retention withheld from each Subcontractor, on the amount withheld to ensure performance of the Contractor. 7-3.2.5.3 Subcontractor Entitlement to Interest If the Contractor elects to receive interest on any moneys withheld in retention by the City, then the Subcontractor shall receive the identical rate of interest received by the Contractor on any retention moneys withheld from the Subcontractor by the Contractor, less any actual pro rata costs associated with administering and calculating that interest. In the event that the interest rate is a fluctuating rate, the rate for the Subcontractor shall be determined by calculating the interest rate paid during the time that retentions were withheld from the Subcontractor. If the Contractor elects to substitute securities in lieu of retention, then, by mutual consent of the Contractor and the Subcontractor, the Subcontractor may substitute securities in exchange for the release of moneys held in retention by the Contractor. The Contractor shall pay each Subcontractor, not later than ten (10) Days after receipt of escrow moneys, the amount owed to each Subcontractor from the moneys plus the respective amount of interest earned, net of costs attributed to the retention held from each Subcontractor, on the amount of retention withheld to ensure performance of the Subcontractor. 7-3.2.5.4 Securities Eligible for Investment Securities eligible for investment shall include those listed in Government Code Section 16430, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed upon between the Contractor and the City. The Contractor shall be the beneficial owner of any securities substituted for any monies withheld and shall receive any interest thereon. 7-3.2.5.5 Escrow Agreement for Security Deposits in Lieu of Retention The escrow agreement that shall be used for the deposit of securities in lieu of retention shall substantially conform to the form prescribed in Public Contract Code Section 22300(f). 7-3.2.5.6 Inconsistencies with Prevailing Statutory Requirements If there is any inconsistency between or differences in Public Contract Code Section 22300 and the terms of this provision, or any future amendments thereto, Section 22300 shall control. 587 12853-0019\2476738v1.doc -75- Richards, Watson & Gershon - 2020 Section 7-3.9 is hereby added to Section 7-3 of Part 1 of the Standard Specifications, as follows: 7-3.9 AUDIT The City or its representative shall have the option of inspecting and/or auditing all records and other written materials used by the Contractor in preparing its billings to the City as a condition precedent to any payment to the Contractor or in response to a construction claim or a Public Records Act (Government Code Section 6250 et seq.) request. The Contractor will promptly furnish documents requested by the City at no cost. Additionally, the Contractor shall be subject to State Auditor examination and audit at the request of the City or as part of any audit of the City, for a period of three (3) years after final payment under the Contract. The Contractor shall include a copy of this Section 7-3.9 in all contracts with its Subcontractors, and the Contractor shall be responsible for immediately obtaining those records or other written material from its Subcontractors upon a request by the State Auditor or the City. If the Project includes other auditing requirements, those additional requirements will be listed in the Special Provisions. SECTION 8 FACILITIES FOR AGENCY PERSONNEL 8-1 General No field offices for City personnel shall be required; however, City personnel shall have the right to enter upon the Project at all times and shall be admitted to the offices of the Contractor to use the telephone, desk and sanitary facilities provided by the Contractor for its own personnel. Section 9 is hereby added to Part 1 of the Standard Specifications, as follows: SECTION 9. ADDITIONAL TERMS 9-1 NONDISCRIMINATORY EMPLOYMENT The Contractor shall not unlawfully discriminate against any individual based on race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation or military and veteran status. The Contractor understands and agrees that it is bound by and will comply with the nondiscrimination mandates of all statutes and local ordinances and regulations. 9-3 CONTRACTOR’S RESPONSIBILITY FOR WORK Until the final acceptance of the Work by the City Council in accordance with Section 3-13.2 of the General Provisions, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part of the Work by the action of the elements, criminal acts, or any other cause. The Contractor shall rebuild, repair, restore and make good all injuries or damages to any portion of the Work occasioned by any cause before its completion and acceptance and shall bear the expense thereof, except for such injuries or damages arising from the sole negligence or willful misconduct of the City, its officers, agents or employees. In the case of suspension of Work from any cause whatever, the Contractor shall be responsible for all materials and the protection of Work already completed, shall properly store and protect them if necessary, and shall provide suitable drainage and erect temporary structures where necessary. 588 12853-0019\2476738v1.doc -76- Richards, Watson & Gershon - 2020 9-4 PROCEDURE IN CASE OF DAMAGE TO PUBLIC PROPERTY Any portions of curb, gutter, sidewalk or any other City improvement damaged by the Contractor during the course of construction shall be replaced by the Contractor at its own cost. The cost of additional replacement of curb, gutter or sidewalk in excess of the estimated quantities shown in the Bid form and Specifications, and found necessary during the process of construction (but not due to damage resulting from carelessness on the part of the Contractor during its operation), shall be paid to the Contractor at the unit prices submitted in his or her Bid. 9-5 REMOVAL OF INTERFERING OBSTRUCTIONS The Contractor shall remove and dispose of all debris, abandoned structures, tree roots and obstructions of any character encountered during the process of excavation. It is understood that the cost of any such removals are made a part of the unit price bid by the Contractor under the item for excavation or removal of existing Work. 9-6 SOILS ENGINEERING AND TESTING A certified materials testing firm may be retained by the City to perform materials tests during the Contractor’s entire operation to ascertain compliance with the Contract requirements. The City shall be responsible for the first series of tests. If the initial tests do not meet the Contract requirements, the Contractor shall bear the cost of all subsequent tests. If the City requires other tests or more specific requirements for testing regarding this Project, those details will be included in the Special Provisions. 9-7 ACCESS TO PRIVATE PROPERTY Unless otherwise stated in the Special Provisions, the Contractor shall be responsible for all fees and costs associated with securing permission to access private property for any portion of the Project. 9-9 CLAIM DISPUTE RESOLUTION In the event of any dispute or controversy with the City over any matter whatsoever, the Contractor shall not cause any delay or cessation in or of Work, but shall proceed with the performance of the Work in dispute. The Contractor shall retain any and all rights provided that pertain to the resolution of disputes and protests between the parties. The Disputed Work will be categorized as an “unresolved dispute” and payment, if any, shall be as later determined by mutual agreement or a court of law. The Contractor shall keep accurate, detailed records of all Disputed Work, claims and other disputed matters. All claims arising out of or related to the Contract Documents or this Project, and the consideration and payment of such claims, are subject to the Government Claims Act (Government Code Section 810 et seq.) with regard to filing claims. All such claims are also subject to Public Contract Code Section 9204 and Public Contract Code Section 20104 et seq. (Article 1.5), where applicable. This Contract hereby incorporates those provisions as though fully set forth herein. Thus, the Contractor or any Subcontractor must file a claim in accordance with the Government Claims Act as a prerequisite to filing a construction claim in compliance with Section 9204 and Article 1.5 (if applicable), and must then adhere to Section 9204 and Article 1.5 (as applicable), pursuant to the definition of “claim” as individually defined therein. 589 12853-0019\2476738v1.doc -77- Richards, Watson & Gershon - 2020 9-10 THIRD PARTY CLAIMS The City shall have full authority to compromise or otherwise settle any claim relating to the Project at any time. The City shall timely notify the Contractor of the receipt of any third-party claim relating to the Project. The City shall be entitled to recover its reasonable costs incurred in providing this notice. 9-11 COMPLIANCE WITH LAWS The Contractor shall comply with all applicable federal, State and local laws, ordinances, codes and regulations in force at the time the Contractor performs pursuant to the Contract Documents. 9-12 CONTRACTOR’S REPRESENTATIONS By signing the Contract, the Contractor represents, covenants, agrees, and declares under penalty of perjury under the laws of the State of California that: (a) the Contractor is licensed, qualified, and capable of furnishing the labor, materials, and expertise necessary to perform the services in accordance with the terms and conditions set forth in the Contract Documents; (b) there are no obligations, commitments, or impediments of any kind that will limit or prevent its full performance under the Contract Documents; (c) there is no litigation pending against the Contractor that could adversely affect its performance of the Contract, and the Contractor is not the subject of any criminal investigation or proceeding; and (d) to the Contractor’s actual knowledge, neither the Contractor nor its personnel have been convicted of a felony. 9-13 CONFLICTS OF INTEREST The Contractor agrees not to accept any employment or representation during the term of the Contract or within twelve (12) months after acceptance as defined in Section 3-13.2 of the General Provisions that is or may likely make the Contractor “financially interested,” as provided in Government Code Sections 1090 and 87100, in any decisions made by the City on any matter in connection with which the Contractor has been retained pursuant to the Contract Documents. 9-14 APPLICABLE LAW The validity, interpretation, and performance of these Contract Documents shall be controlled by and construed under the laws of the State of California, excluding California’s choice of law rules. Venue for any such action relating to the Contract shall be in the Superior Court with geographic jurisdiction over the City. 9-15 TIME Time is of the essence in these Contract Documents. 9-16 INDEPENDENT CONTRACTOR The Contractor and Subcontractors shall at all times remain, as to the City, wholly independent contractors. Neither the City nor any of its officials, officers, employees or agents shall have control over the conduct of the Contractor, Subcontractors, or any of their officers, employees, or agents, except as herein set forth, and the Contractor and Subcontractors are free to dispose 590 12853-0019\2476738v1.doc -78- Richards, Watson & Gershon - 2020 of all portions of their time and activities that they are not obligated to devote to the City in such a manner and to such Persons that the Contractor or Subcontractors wish except as expressly provided in these Contract Documents. The Contractor and Subcontractors shall have no power to incur any debt, obligation, or liability on behalf of the City, bind the City in any manner, or otherwise act on behalf of the City as agents. The Contractor and Subcontractors shall not, at any time or in any manner, represent that they or any of their agents, servants or employees, are in any manner agents, servants or employees of the City. The Contractor and Subcontractors agree to pay all required taxes on amounts paid to them under the Contract, and to indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by the Contract Documents. The Contractor shall include this provision in all contracts with all Subcontractors. 9-17 CONSTRUCTION In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of these Contract Documents shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Contract Documents or who drafted that portion of the Contract Documents. 9-18 NON-WAIVER OF TERMS, RIGHTS AND REMEDIES Waiver by either party of any one (1) or more of the conditions of performance under these Contract Documents shall not be a waiver of any other condition of performance under these Contract Documents. In no event shall the making by the City of any payment to the Contractor constitute or be construed as a waiver by the City of any breach of covenant, or any default that may then exist on the part of the Contractor, and the making of any such payment by the City shall in no way impair or prejudice any right or remedy available to the City with regard to such breach or default. 9-19 TERM The Contract is effective as of the Effective Date listed, and shall remain in full force and effect until the Contractor has fully rendered the services required by the Contract Documents or the Contract has been otherwise terminated by the City. However, some provisions may survive the term listed within this Section, as stated in those provisions. 9-20 NOTICE Except as otherwise required by law, any notice or other communication authorized or required by these Contract Documents shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during the City’s regular business hours or (b) on the third (3rd) business day following deposit in the United States mail, postage prepaid, to the addresses listed on the Contractor’s Bid and City Hall, or at such other address as one party may notify the other. 591 12853-0019\2476738v1.doc -79- Richards, Watson & Gershon - 2020 9-21 SEVERABILITY If any term or portion of these Contract Documents is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of these Contract Documents shall continue in full force and effect. 592 12853-0019\2476738v1.doc -80- Richards, Watson & Gershon - 2020 SPECIAL PROVISIONS The Sections that follow supplement, but do not replace, the corresponding provisions in Part 3 (Construction Methods) and Part 4 (Existing Improvements) of the Standard Specifications, except as otherwise indicated herein. In the event of any conflict between the Standard Specifications and these Special Provisions, these Special Provisions shall control. SECTION 306 - OPEN TRENCH CONDUIT CONSTRUCTION 306-3.1 GENERAL Pursuant to Public Contract Code Section 7104, if the project involves trenching more than four (4) feet deep, Contractor shall promptly and before the following conditions are disturbed notify the City in writing of any: a. Material that Contractor believes may be material that is hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; and/or b. Subsurface or latent physical conditions at the site differing from those indicated; and/or c. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract. d. As required by Labor Code Section 6705 and in addition thereto, whenever work under the Contract that involves an estimated expenditure in excess of twenty- five thousand dollars ($25,000) for the excavation of any trench or trenches five (5) feet or more in depth, Contractor shall submit for acceptance by City in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards established by the Construction Safety Orders of the Division of Industrial Safety, the plan shall be prepared by a registered civil or structural engineer employed by Contractor, and all costs therefor shall be included in the price of the Contract. Nothing in this provision shall be deemed to allow the use of a shoring, sloping, or other protective system less effective than that required by the Construction Safety Orders. Nothing in this provision shall be construed to impose tort liability on the City or on any City officer, agent, consultant, representative, or employee. All plans, processing and shoring costs are Contractor’s responsibility and must be included in Contractor’s bid. SECTION 400 - PROTECTION AND RESTORATION 400-1 GENERAL All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or reestablishing existing improvements shall be included in the Bid. 593 12853-0019\2476738v1.doc -81- Richards, Watson & Gershon - 2020 SECTION 402 - UTILITIES 402-1 LOCATION The location and existence of any underground Utility or substructure has not been obtained. The methods used and costs involved to locate existing elements, points of connection and all construction methods are the Contractor’s sole responsibility. Accuracy of information furnished, as to existing conditions, is not guaranteed by the City. The Contractor, at its sole expense, must make all investigations necessary to determine locations of existing elements, which may include contacting Underground Service Alert and other private underground locating firm(s), utilizing specialized locating equipment, hand trenching, or both. For every Dig Alert Identification Number issued by Underground Service Alert during the course of the Project, the Contractor must submit to the City the following form. The Contractor shall be responsible for preserving the integrity of the existing underground utilities at the site. 594 12853-0019\2476738v1.doc -82- Richards, Watson & Gershon - 2020 UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER FORM No excavation will be permitted until this form is completed and returned to the City. Government Code Section 4216 et seq. requires a Dig Alert Identification Number to be issued before a permit to excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 811 a minimum of three (3) Working Days before scheduled excavation. For best response, provide as much notice as possible up to ten (10) Working Days. Dig Alert Identification Number: ________________________________________________ Dated: (“CONTRACTOR”) By: Printed Name: Title: By: Printed Name: Title: Note: This form is required for every Dig Alert Identification Number issued by Underground Service during the course of the Work. Additional forms may be obtained from the City upon request. 595 12853-0019\2476738v1.doc -83- Richards, Watson & Gershon - 2020 402-1.3 Entry by Utility Owners The right is reserved to the owners of public Utilities or franchises to enter the Project site for the purpose of making repairs or changes in their property that may be necessary as a result of the Work as well as any other reason authorized by the City. When the Contract Documents provide for the Utility owners to alter, relocate or reconstruct a Utility, or when the Contract Documents are silent in this regard and it is determined by the City that the Utility owners must alter, relocate or reconstruct a Utility, the Contractor shall schedule and allow adequate time for those alterations, relocations or reconstructions by the respective Utility owners. City employees and agents shall likewise have the right to enter upon the Project site at any time and for any reason or no reason at all. 402-2 PROTECTION If Contractor damages or breaks the Utilities, it will be the Contractor’s responsibility to repair the Utility at no cost to the Utility or the City. 402-3 REMOVAL Facilities encountered during the prosecution of the Work that are determined to be abandoned shall be removed by the Contractor as required for the Work, unless directed otherwise by the City. The remaining portion of the existing Utility which is left in place shall be accurately recorded, in elevation and plan, on the control set of Contract Drawings. 402-4 RELOCATION The Contractor shall cooperate fully with all Utility forces of the City or forces of other public or private agencies engaged in the relocation, altering, or otherwise rearranging of any facilities that interfere with the progress of the Work. The Contractor shall schedule the Work so as to minimize interference with the relocation, altering, or other rearranging of facilities. 402-6 COOPERATION The Contractor’s attention is directed to the fact that Work may be conducted at or adjacent to the site by other contractors during the performance of the Work under this Contract. The Contractor shall conduct its operations so as to cause a minimum of interference with the work of such other contractors, and shall cooperate fully with such contractors to provide continued safe access to their respective portions of the site, as required to perform work under their respective contracts. Compensation for compliance shall be included in the various items of the Work, and no additional compensation shall be allowed therefor. 402-7 NOTIFICATION The Contractor shall notify the City and the owners of all Utilities and substructures not less than forty-eight (48) hours before starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or accurate: CITY ENGINEER (805) 517-6255 TIME WARNER (888) 892-2253 596 12853-0019\2476738v1.doc -84- Richards, Watson & Gershon - 2020 TRAFFIC ENGINEER (805) 517-6285 CITY POLICE DEPARTMENT (805) 532-2700 CALIFORNIA HIGHWAY PATROL (805) 553-0800 MOORPARK TRANSIT DIVISION (805) 517-6257 VENTURA COUNTY WATERWORKS DISTRICT NO. 1 (805) 378-3000 CALLEGUAS MUNICIPAL WATER DISTRICT (805) 526-9323 SO. CALIFORNIA EDISON COMPANY (800) 655-4555 THE GAS COMPANY (800) 427-2200 MED TRANS AMBULANCE (805) 495-4668 AT & T (800) 310-2355 UNDERGROUND SERVICE ALERT 1-800-422-4133 UNION PACIFIC RAILROAD CO. (800) 336-9193 MOORPARK UNIFIED SCHOOL DIST. (805) 378-6300 VENTURA COUNTY FIRE PROTECTION DISTRICT (805) 389-9710 U.S. POST OFFICE (805) 529-3596 WASTE MGMT/GI RUBBISH (805) 522-9400 ANDERSON RUBBISH (805) 526-1919 CALTRANS (805) 653-2584 SUNESYS California Sales / Operations (951) 278-0400 597 Appendix I APPENDIX I Scope of Work ADA Restroom Renovations and Sewer Line Replacement Moorpark, California This is intended to be a general scope of work for the project. The scope of work does not supersede information on the plans and drawings for the project. Any conflict between this scope of work and the plans, drawings and technical specifications, the plans, drawings and technical specifications will supersede this scope of work. 101. Provide all labor and materials, tools, equipment, transportation and services , and any and all materials necessary for ADA Restroom Renovations. The work for this item is noted on the Architectural Plan Set (Sheets G001-G003, A101, A401 & A501) and on the Electrical Plan Set (Sheets E101 & E201). Demolition work as noted on the plans shall be included within this line item. Measurement and payment for this work will be made at the contract lump sum as shown in the Bid Schedule. The contract price and payment shall be considered as full compensation for ADA Restroom Renovations pursuant to Plans and Specifications detailed in Appendix II & III. 102. Provide all labor and materials, tools, equipment, transportation and services, and any and all materials necessary for and incidental to performing all operations and improvements related to Sewer Line Replacement. The work for this item is noted on Plumbing Plan Set (Sheets P101-P302). Measurement and payment for this work will be made at the contract lump sum as shown in the Bid Schedule. The contract price and payment shall be considered as full compensation pursuant to Plans and Specifications detailed in Appendix IV. Note: All Work shall be conducted between the hours of 8 a.m. to 5 p.m., Monday through Friday, with the exception of tasks that are expected to generate a significant amount of noise, dust or other disruption to City Hall activities. Such tasks shall be performed in their entirety, including site cleanup, outside of City Hall working hours, with advance written approval from the City. No Work will be allowed on Sunday, or City holidays. 598 Appendix II APPENDIX II ARCHITECTURAL PLAN SET 599 ARCHITECT AMADOR WHITTLE ARCHITECTS, INC. 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 OR (818) 874-0071 DESIGN TEAM OWNER CITY OF MOORPARK 799 MOORPARK AVE. MOORPARK, CA 93021 (805) 517-6200 PLUMBING, MECHANICAL, ELECTRICAL & FIRE ALARM BUDLONG & ASSOCIATES, INC. 315 ARDEN AVE., SUITE 23 GLENDALE, CA 91203 (818) 638-8780 SCOPE OF WORK 1.UPGRADE EXISTING RESTROOMS TO BE ACCESSIBLE. PROJECT SITE NOT TO SCALE APPLICABLE CODES LIST OF 2019 CALIFORNIA CODE OF REGULATIONS (C.C.R.): APPLICABLE CODES AS OF JANUARY 1, 2020 2019 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE, TITLE 24 C.C.R. 2019 CALIFORNIA BUILDING CODE, TITLE 24 C.C.R. (2015 INTERNATIONAL BUILDING CODE OF THE INTERNATIONAL CODE COUNCIL, WITH CALIFORNIA AMENDMENTS) 2019 CALIFORNIA ELECTRICAL CODE, TITLE 24 C.C.R. (2014 NATIONAL ELECTRICAL CODE OF THE NATIONAL FIRE PROTECTION ASSOCIATION, NFPA) 2019 CALIFORNIA MECHANICAL CODE, TITLE 24 C.C.R. (2015 UNIFORM MECHANICAL CODE OF THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, IAPMO) 2019 CALIFORNIA PLUMBING CODE, TITLE 24 C.C.R. (2015 UNIFORM PLUMBING CODE OF THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, IAPMO) 2019 CALIFORNIA ENERGY CODE, TITLE 24 C.C.R. CURRENTLY VACANT 2019 CALIFORNIA HISTORICAL BUILDING CODE, TITLE 24 C.C.R. 2019 CALIFORNIA FIRE CODE, TITLE 24 C.C.R. (2015 INTERNATIONAL FIRE CODE OF THE INTERNATIONAL CODE COUNCIL) 2019 CALIFORNIA EXISTING BUILDING CODE (2015 INTERNATIONAL EXISTING BUILDING CODE OF THE INTERNATIONAL CODE COUNCIL, WITH AMENDMENTS) 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN CODE), TITLE 24 C.C.R. 2019 CALIFORNIA REFERENCE STANDARDS CODE, TITLE 24 C.C.R. PART 1- PART 2- PART 3- PART 4- PART 5- PART 6- PART 7- PART 8- PART 9- PART 10- PART 11- PART 12- PARTIAL LIST OF APPLICABLE STANDARDS AUTOMATIC SPRINKLER SYSTEMS (CALIFORNIA AMENDED) STANDPIPE SYSTEMS (CALIFORNIA AMENDED) DRY CHEMICAL EXTINGUISHING SYSTEMS WET CHEMICAL EXTINGUISHING SYSTEMS STATIONARY PUMPS PRIVATE FIRE SERVICE MAINS (CALIFORNIA AMENDED) NATIONAL FIRE ALARM CODE (CALIFORNIA AMENDED) (NOTE: SEE UL STANDARD 1971 FOR "VISUAL DEVICES") FIRE DOOR AND OTHER OPENING PROTECTIVES CRITICAL RADIANT FLUX OF FLOOR COVERING SYSTEMS CLEAN AGENT FIRE EXTINGUISHING SYSTEMS NFPA 13 NFPA 14 NFPA 17 NFPA 17a NFPA 20 NFPA 24 NFPA 72 NFPA 80 NFPA 253 NFPA 2001 2019 EDITION 2019 EDITION 2017 EDITION 2017 EDITION 2019 EDITION 2019 EDITION 2019 EDITION 2019 EDITION 2019 EDITION 2018 EDITION 2019 CALIFORNIA BUILDING CODE (FOR SFM) REFERENCED STANDARDS CHAP. 35 DEPARTMENT OF JUSTICE REGULATIONS FOR TITLE II OF THE AMERICANS WITH DISABILITIES ACT OF 1990 WITH REVISED REGULATIONS AS PUBLISHED IN THE FEDERAL REGISTER ON SEPTEMBER 15, 2010, EFFECTIVE MARCH 15, 2012. TITLED ADA STANDARDS FOR ACCESSIBLE DESIGN. 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET: G001 01.02.20 SAN WJA 19-BUD-005 799 Moorpark Ave. Moorpark, CA 93021 TITLE SHEET CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION WJA CONSTRUCTION DOCUMENTSLICENSED RENEWAL DATE JANUARY 31, 2021 ARC H T ECTI C-20348 STAT E OF CA L IF O R NIARJOGE WILLIAM A MADORD R A W I N G L I S T SHT NO.DRAWING TITLE GENERAL G001 TITLE SHEET G002 ABBREVIATIONS, LEGEND, & ACCESSIBILITY NOTES G003 ACCESSIBILITY DETAILS ARCHITECTURAL A101 DEMOLITION & NEW PLANS A401 ENLARGED RESTROOM DEMO, NEW PLANS & INTERIOR ELEVATIONS A501 DETAILS Grand total: 6 CITY OF MOORPARK -ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION 799 MOORPARK AVE. MOORPARK, CA 93021 CONSTRUCTION DOCUMENTS GENERAL NOTES 16. ALL SALVAGEABLE MATERIALS AND EQUIPMENT TO BE REMOVED SHALL REMAIN THE SOLE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL CONSULT WITH THE OWNER CONCERNING STORAGE AND/OR DISPOSAL OF SUCH EQUIPMENT. OWNER HAS FULL SALVAGE RIGHTS. ALL REMOVED MATERIALS OTHER THAN ITEMS TO BE SALVAGED, OR REUSED SHALL BECOME CONTRACTOR'S PROPERTY AND SHALL BE REMOVED FROM THE PROJECT SITE. 17. ALL WORK, INCLUDING REMOVAL OF EXISTING WORK, SHALL BE PERFORMED IN A MANNER THAT MINIMIZES THE AMOUNT OF NOISE, DUST, TRAFFIC AND/OR OTHER FORMS OF DISTURBANCES IN COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES SO THAT THE PUBLIC, STUDENTS AND STAFF, AS WELL AS OTHER OCCUPIED AREAS OF THE SCHOOL ARE SUBJECTED TO AS LITTLE DISRUPTION AS REASONABLY POSSIBLE. 18. ROUTES OF INGRESS AND EGRESS FOR MATERIALS AND WORKMEN, AND LIMITS OF THE PROJECT AREA WILL BE DESIGNATED BY THE OWNER. THE CONTRACTOR SHALL CONFINE HIS ACTIVITES WITHIN SUCH LIMITS. THE CONTRACTOR SHALL INSTALL AND MAINTAIN ADEQUATE SAFETY AND DUST BARRIERS IN THE SITE, ACROSS CORRIDORS AND ELSEWHERE AS REQUIRED. 19. SHUT DOWN OF EXISTING AND OPERATING PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS OR PORTIONS THEREOF SHALL BE COORDINATED IN ADVANCE WITH THE OWNER. 20. CONTRACTOR SHALL COORDINATE ALL WORK SHOWN ON THE ARCHITECTURAL DRAWINGS WITH THE SPECIFICATIONS AND THE WORK SHOWN ON THE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS. ANY DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IN WRITIING BEFORE PROCEEDING WITH ANY RELATED WORK. 21. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FIRE RATING CONTINUITY OF STRUCTURE, WALLS, FLOOR AND CEILINGS INTERRUPTED BY THE WORK OF ALL TRADES. THIS INCLUDES, BUT IS NOT LIMITED TO, FIRE RATED ENCLOSURES AT THE CEILING AND WALLS OF CORRIDORS AND STORAGE ROOMS, DUCT SHAFTS. 22. PROVIDE ALL NECESSARY BLOCKING, BACKING AND FRAMING FOR LIGHT FIXTURES, ELECTRICAL UNITS, A/C EQUIPMENT, TOILET FIXTURES & ACCESSORIES, RAILINGS, GRAB BARS, AND ALL OTHERS REQUIRING SAME. 23. CEILING HEIGHT DIMENSIONS ARE FROM FINISH FLOOR TO FINISH FACE OF CEILING. 24. WHERE NEW WALLS ALIGNS WITH EXISTING WALL, PROVIDE SMOOTH INVISIBLE TRANSITION BETWEEN NEW AND EXISTING. 25. NEW GYPSUM BOARD FINISH SHALL BE 5/8" TYPE 'X' OR AS REQUIRED FOR UL FIRE-RATING AS INDICATED ON DRAWINGS. 26. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY EIGHT (8) FEET HIGH CHAIN LINK FENCE BARRICADES AT WORK AREAS, CITY APPROVED STORAGE AREAS AND WHEREVER NECESSARY TO MAINTAIN A SAFE PASSAGE AND SAFE ENVIRONMENT. 27. BEFORE PROCEEDING WITH THE CORING OR CUTTING OF WALLS AND FLOORS, ETC., THE CONTRACTOR SHALL PREPARE LAYOUT OF CUTTING OR CORING AND SHALL HAVE THE APPROVAL BY THE STRUCTURAL ENGINEER IN ORDER TO PROCEED WITH THE CUTTING OR CORING. 28. SAW-CUT EXISTING A.C. PAVING AND /OR CONCRETE FLOOR SLAB AS REQUIRED FOR NEW PIPE INSTALLATION AND NEW DEPRESSED CONCRETE SLAB, AND REPAIR TO MATCH EXISTING. 29. STRENGTH OF CONCRETE A) SLABS ON EARTH, SIDEWALKS AND CURBS: 3,000 PSI AT 28 DAYS B) FOUNDATIONS: 3,000 PSI AT 28 DAYS 30. THE CONTRACTOR SHALL NOT COMMENCE THE WORK, IN PART OR IN FULL, PRIOR TO OBTAINING THE NOTICE-TO-PROCEED (NTP) FROM THE OWNER. 31. IN CASE OF CONFLICT, THE MORE EXPENSIVE CONSTRUCTION MEANS AND METHOD SHALL BE USED. 32. THE PROVISIONS OF CFC CHAPTER 33 AND CBC CHAPTER 33 SHALL BE ENFORCED ON THIS PROJECT. 33. THE INFORMATION CONTAINED IN THESE CONSTRUCTION DOCUMENTS ARE TO BE FIELD VERIFIED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION OR BIDDING. 34. UNLESS SPECIFICALLY NOTED OTHERWISE IN THESE DRAWINGS, ALL EXISTING CONDITIONS SHALL REMAIN AS-IS. GENERAL NOTES 1. INTERPRETATION OF CONSTRUCTION DOCUMENTS A. ALL INFORMATION DEPICTED IN THESE DRAWINGS AND RELATIVE TO EXISTING CONDITIONS IS BASED ON THE BEST AVAILABLE DATA AT THE TIME THESE CONSTRUCTION DOCUMENTS WERE BEING EXCECUTED, BUT WITHOUT GUARANTEE OF ACCURACY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND SHALL REPORT ANY DISCREPANICES TO ARCHITECT PRIOR TO COMMENCING ANY WORK. B. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS INCURRED RESULTING FROM THE REMOVAL OR REPLACEMENT OF WORK INSTALLED WITHOUT PROPER COORDINATION TO ALL OTHER TRADES, AND/OR PRIOR TO OBTAINING CLARIFICATION FROM THE ARCHITECT WHERE CONFLICTING INFORMATION EXISTS ON THE DRAWINGS. C. THE CONTRACTOR SHALL FURNISH ALL BIDDERS WITH A COMPLETE SET OF CONSTRUCTION DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS, SPECIFICATIONS AND ADDENDUMS. D. ALL BIDS AND LINE ITEM COSTS SUBMITTED BY THE CONTRACTOR IN CONJUNCTION WITH HIS SUBCONTRACTORS ARE CONSIDERED TO INCLUDE COMPLETE COORDINATION BETWEEN THE VARIOUS DISCIPLINES AS WELL AS ALL OTHER REQUIREMENTS OF THESE CONSTRUCTION DOCUMENTS, INCLUDING BUT NOT LIMITED TO CODE AND PUBLIC UTILITY REQUIREMENTS. FURTHER, WHERE THERE ARE CONFLICTING SOLUTIONS IN THE CONSTRUCTION DOCUMENTS AND BID OR LINE ITEM COST IS SUBMITTED BY THE CONTRACTOR WITHOUT ANY FORMAL WRITTEN REQUEST FOR CLARIFICATION PRIOR TO BID OPENING, ALL SUCH ITEMS WILL BE CONSIDERED TO INCLUDE THE MOST EXPENSIVE OF THE POSSIBLE SOLUTIONS DEPICTED IN THE CONSTRUCTION DOCUMENTS. E. MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT WRITTEN APPROVAL OF THE ARCHITECT. 2. CONTRACTOR SHALL VISIT THE SITE TO INVESTIGATE AND VERIFY ALL DIMENSIONS AND EXISTING SITE CONDITIONS AT JOB SITE PRIOR TO START OF WORK. 3. ALL DIMENSIONS INDICATED ARE BELIEVED TO BE ACCURATE, BUT ARE NOT GUARANTEED TO BE SO. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. COORDINATE WITH EXISTING CONDITIONS WHERE INSUFFICIENT DETAIL DIMENSIONS ARE AVAILABLE. ALL DIMENSIONS ARE TO FINISHED FACE OF CONSTRUCTION OR CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE. DIMENSIONS NOTED AT “CLR” (CLEAR) ARE NOT ADJUSTABLE WITHOUT ARCHITECT’S APPROVAL. 4. DIMENSIONS SHOWN SHALL HAVE PREFERENCE OVER SCALE. 5. ALL ITEMS INCLUDING BUILDINGS SHOWN ARE NEW UNLESS NOTED AS EXISTING (E). 6. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT EXISTING PIPELINES AND UTILITIES THAT ARE TO REMAIN IN SERVICE. CONTRACTOR SHALL VERIFY THAT THOSE PIPELINES AND UTILITIES TO BE REMOVED HAVE BEEN DISCONNECTED, SHUT DOWN OR ABANDONED PRIOR TO ATTEMPTING REMOVAL OR DEMOLITION IN A MANNER TO AVOID ANY DISRUPTION OF EXISTING FACILITIES. 7. CONTRACTOR SHALL PROTECT ALL SURFACES & FIXTURES TO REMAIN DURING DEMOLITION AND CONSTRUCTION. 8. ALL DAMAGE DONE TO EXISTING CONSTRUCTION AS A RESULT OF DEMOLITION OR INSTALLATION SHALL BE COMPLETELY REPAIRED BY CONTRACTOR AT NO COST TO OWNER. REPAIRED WORK SHALL MATCH EXISTING CONSTRUCTION. 9. CONTRACTOR SHALL REPAIR AND PATCH UP ALL DAMAGES TO EXISTING SURFACES CAUSED BY REMOVAL OF EXISTING EQUIPMENT ATTACHED TO EXISTING SURFACES. (CHALKBOARDS, BOOKSHELVES, TACKBOARDS, WALL HEATERS, PIPING, ETC.) 10. WHERE PATCHES ARE REQUIRED IN EXISTING, SURFACES ADJACENT MATERIAL SHALL BE MATCHED IN TEXTURE AND FINISH. 11. "DEMOLISH" AND "REMOVE" SHALL MEAN TO DEMOLISH, REMOVE FROM THE SITE AND DISPOSE OF IN A LEGAL MANNER UNLESS NOTED OTEHRWISE. TERMINATE PIPING BELOW SUBSTRATE FOR PATCHING. ELECTRICAL WIRE DISCONNECT SHALL BE AT THE SOURCE OF POWER. 12. SALVAGED PRODUCTS SAVED FOR OWNER AS A RESULT OF DEMOLITION ACTIVITY AND/OR PRODUCTS STORED FOR USE IN CONSTRUCTION SHALL BE STORED IN A MANNER SUCH THAT NO MATERIALS ARE DAMAGED AND PUBLIC SAFETY IS MAINTAINED. 13. CONTRACTOR SHALL THOROUGHLY CLEAN AND SECURE THE AREA OF CONSTRUCTION AFTER EACH DAY OF WORK. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL CONSTRUCTION DEBRIS OFF SITE. 14. LOCATIONS OF STRUCTURES, UNDERGROUND PIPELINES AND UTILITIES WERE OBTAINED FROM AVAILABLE RECORDS. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS AND ELEVATIONS OF ALL PIPELINES AND UTILITIES BEFORE COMMENCING DEMOLITON, EARTHWORK OR CONSTRUCTION WORK. 15. GENERAL CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS PRIOR TO START OF CONSTRUCTION. ALL QUESTIONS SHALL BE SENT TO ARCHITECT. <AREA FOR BUDLONG LOGO> PLANCHECK SUBMITAL 03/17/20 600 1. SYMBOL OF ACCESSIBILITY A. THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE THE STANDARD USED TO IDENTIFY FACILITIES THAT ARE ACCESSIBLE TO AND USEABLE BY PHYSICALLY DISABLED PERSON AS SET FORTH IN THESE BUILDING STANDARDS AND AS SPECIFICALLY REQUIRED IN THIS SECTION. NOTE: SEE FIGURE 11B-703.7.2.1 BELOW. B. COLOR OF SYMBOL: THE SYMBOL SPECIFIED ABOVE SHALL CONSIST OF A WHITE FIGURE ON A BLUE BACKGROUND. THE BLUE SHALL BE EQUAL TO COLOR NO. 15090 IN FEDERAL STANDARD 595B. EXCEPTION: THE APPROPRIATE ENFORCEMENT AGENCY MAY APPROVE SPECIAL SIGNS AND IDENTIFICATION NECESSARY TO COMPLEMENT DECOR OR UNIQUE DESIGN WHEN IT IS DETERMINED THAT SUCH SIGNS AND IDENTIFICATION PROVIDES ADEQUATE DIRECTION TO PERSONS WITH DISABILITY. C. CONTRAST OF SYMBOL: CHARACTERS AND SYMBOLS SHALL CONTRAST WITH THEIR BACKGROUND, EITHER LIGHT CHARACTERS ON A DARK BACKGROUND OR DARK CHARACTERS ON A LIGHT BACKGROUND. 2. ENTRANCES A. LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL, SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. B. HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 34 INCHES AND 44-INCHES ABOVE THE FLOOR. PANIC HDWR TO BE MOUNTED ABOVE 34" TO 44" C. THE FLOOR LANDING ON EACH SIDE OF AND ENTRANCE OR PASSAGE DOOR SHALL BE LEVEL AND CLEAR. THE LEVEL AND CLEAR AREA SHALL HAVE A LENGTH IN THE DIRECTION OF DOOR SWING OF AT LEAST 60-INCHES AND THE LENGTH OPPOSITE THE SWING OF 48-INCHES AS MEASURE AT RIGHT ANGLES TO THE PLANE OF THE DOOR IN ITS CLOSED POSITION. D. THE FLOOR OR LANDING SHALL BE NO MORE THAN 1/2" LOWER THAN THE THRESHOLD OR THE DOORWAY. CHANGE IN LEVEL BETWEEN 1/4" AND 1/2" SHALL BE BEVELED WITH A SLOPE NO GREATER THAN 1:2. E. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 LBS FOR EXTERIOR DOOR AND 5 LBS. FOR INTERIOR DOORS, SUCH PULL OR PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OF FOLDING DOORS. COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO OPERATE THE DOOR MAY BE INCREASED AS AUTHORIZED BY AUTHORITY HAVING JURISDICTION, NOT TO EXCEED 15 LBS. 3. ACCESSIBLE ENTRANCES A. ACCESSIBLE ENTRANCES TO THE BUILDING SHALL BE IDENTIFIED BY THE INTERNATIONAL SYMBOL OF ACCESSIBILITY AS REFERENCED HEREIN. SIGNS AT ENTRIES SHALL BE LOCATED SUCH THAT THEY ARE VISIBLE FROM THE MAIN APPROACH TO THE ENTRY. 4. SIGNS A. ALL SIGNS (AT MAIN ENTRANCES, TOILETS, PERMANENT ROOMS, ASSISTIVE LISTENING SYSTEM(S) ETC. SHALL COMPLY WITH TITLE 24 AND SECTION 11B-216 AND 11B-703. 5.PATH OF TRAVEL A. GATES IN PATH OF TRAVEL MUST COMPLY WITH EXIT DOOR REQUIREMENTS. (CBC 11B-206.5, 11B-404 AND ADA STANDARDS FOR ACCESSIBLE DESIGN, DEPARTMENT OF JUSTICE, SECTION 404). GATE HARDWARE SHALL NOT REQUIRE PINCHING, GRASPING, OR TWISTING MOTION TO OPERATE. PROVIDE SOLID KICK PLATES 10" MINIMUM HIGH. CLEAR SPACE BELOW GATE SHALL BE 3" MAXIMUM ABOVE PAVING ON BOTH SIDES OF THE GATE. THE MAXIMUM EFFORT TO OPERATE THE GATES SHALL NOT EXCEED 5 LBS. B. HANDRAILS FOR STAIRS AND RAMPS SHALL BE PER APPROVED PLANS AND MOUNTED 1 1/2" MINIMUM FROM SIDE WALLS. CBC 11B-505. ALL WELDED JOINTS AND SURFACES SHALL BE GROUND SMOOTH, NO SHARP OR ABRASIVE CORNERS, EDGES OR SURFACES. WALL SURFACES ADJACENT TO HANDRAIL SHALL BE SMOOTH. CBC 11B.505.6 TO 11B.505.8. C. “DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE STATEMENT: THE P.O.T. IDENTIFIED IN THESE CONSTRUCTION DOCUMENTS IS COMPLIANT WITH THE CURRENT APPLICABLE CALIFORNIA BUILDING CODE ACCESSIBILITY PROVISIONS FOR PATH OF TRAVEL REQUIREMENTS FOR ALTERATIONS, ADDITIONS AND STRUCTURAL REPAIRS. AS PART OF THE DESIGN OF THIS PROJECT, THE P.O.T. WAS EXAMINED AND ANY ELEMENTS, COMPONENTS OR PORTIONS OF THE P.O.T. THAT WERE DETERMINED TO BE NONCOMPLIANT 1) HAVE BEEN IDENTIFIED AND 2) THE CORRECTIVE WORK NECESSARY TO BRING THEM INTO COMPLIANCE HAS BEEN INCLUDED WITHIN THE SCOPE OF THIS PROJECT’S WORK THROUGH DETAILS, DRAWINGS AND SPECIFICATIONS INCORPORATED INTO THESE CONSTRUCTION DOCUMENTS. ANY NONCOMPLIANT ELEMENTS, COMPONENTS OR PORTIONS OF THE P.O.T. THAT WILL NOT BE CORRECTED BY THIS PROJECT BASED ON VALUATION THRESHOLD LIMITATIONS OR A FINDING OF UNREASONABLE HARDSHIP ARE SO INDICATED IN THESE CONSTRUCTION DOCUMENTS. DURING CONSTRUCTION, IF P.O.T. ITEMS WITHIN THE SCOPE OF THE PROJECT REPRESENTED AS CODE COMPLIANT ARE FOUND TO BE NONCONFORMING BEYOND REASONABLE CONSTRUCTION TOLERANCES, THEY SHALL BE BROUGHT INTO COMPLIANCE WITH THE CBC AS A PART OF THIS PROJECT BY MEANS OF A CONSTRUCTION CHANGE DOCUMENT.”(DSA PR15-01) D. ADA TOLERANCE NOTE: IN CASE WHERE SLOPE PERCENTAGES AND DIMENSIONS ARE IDENTIFIED ON THESE PLANS FOR ELEMENTS REGULATED BY THE AMERICAN DISABILITIES ACT AND CHAPTER IIB OF THE CALIFORNIA BUILDING CODE, THE SLOPE PERCENTAGES AND DIMENSIONS SHOWN MAY BE MORE STRINGENT THAN REQUIRED BY CODE. DIMENSIONS AND SLOPE GRADIENTS ALLOWED IN CHAPTER IIB OF THE CBC SHALL BE ACCEPTABLE AND DEEMED TO BE IN COMPLIANCE WITH THESE DOCUMENTS. GENERAL ACCESSIBILITY NOTES NOTE: POST SIGNAGE AT SIDELIGHT WINDOW TO ALL ENTRANCES RFHSSD 5 X 5 DECAL -POSTED PROPORTIONS DISPLAY CONDITIONS INTERNATIONAL SYMBOL OF ACCESSIBILITY (2019 CBC)FIGURE 11B-703.7.2.1 ? 1 View Name 1/8" = 1'-0" Room name 101 101 1 A101 . A101 1 . DRAWING REFERENCE DRAWING IDENTIFICATION SHEET NUMBER WHERE DRAWN DIRECTION INDICATOR (WHERE APPLIES) DRAWING TITLE DRAWING IDENTIFICATION DRAWING NAME DETAIL REFERENCE DETAIL NUMBER SHEET NUMBER WHERE DRAWN KEY NOTES DOOR REFERENCE SEE SHEET A601 9.14 (E) STUD AND GYPSUM BOARD WALL (N) STUD WALL (E) CONCRETE WALL FLOOR PLAN .CLASSROOM. ROOM IDENTIFICATION 5' -0" DIAMETER CLEAR SPACE 30" x 48" CLEAR SPACE LEGEND ROOM NUMBER 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET: G002 01.02.20 SAN WJA 19-BUD-005 799 Moorpark Ave. Moorpark, CA 93021 ABBREVIATIONS, LEGEND, & ACCESSIBILITY NOTES CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION WJA CONSTRUCTION DOCUMENTSLICENSED RENEWAL DATE JANUARY 31, 2021 ARC H T ECTI C-20348 STAT E OF CA L IF O R NIARJOGE WILLIAM A MADORHDW HARDWARE HI HIGH HT HEIGHT IN INCHES INFO INFORMATION INSUL INSULATION INT INTERIOR JAN JANITOR K.D. KNOCK-DOWN LAM LAMINATE LAV LAVATORY LBS POUNDS M.O. MASONRY OPENING M.R. MOISTURE RESISTANT MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MFR MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MTL METAL N.I.C. NOT IN CONTRACT N.T.S. NOT TO SCALE N/A NOT AVAILABLE NO., # NUMBER O.C. ON CENTER OPNG OPENING OPP OPPOSITE PL PLASTIC PR PAIR PT POINT PWD PLYWOOD R RISER R.C.P. REFLECTED CEILING PLAN R.D. ROOF DRAIN R.O. ROUGH OPENING REF REFERENCE REFL REFLECTED REINF REINFORCING REQ'D REQUIRED REV REVISION RM ROOM S & P SHELF AND POLE S.F. SQUARE FEET S.S. STAINLESS STEEL SCHED SCHEDULE SECT SECTION SHT SHEET SIM SIMILAR SQ SQUARE STD STANDARD STL STEEL STOR STORAGE STRUCT STRUCTURAL SUSP SUSPEND, SUSPENDED T & G TONGUE AND GROOVE T.O.C. TOP OF CURB T.O.P. TOP OF PLATE T.O.P. TOP OF PARAPET T.O.W. TOP OF WALL TEL TELEPHONE THK THICK TYP TYPICAL U.L. UNDERWRITERS LABORATORIES U.N.O. UNLESS NOTED OTHERWISE V.C.T. VINYL COMPOSITION TILE V.I.F. VERIFY IN FIELD VERT VERTICAL VEST VESTIBULE W.C. WATER CLOSET W.H. WATER HEATER W.R. WATER RESISTANCE W.W.M. WELDED WIRE MESH W/ WITH WD WOOD WDW WINDOW & AND (E) EXISTING @ AT A.B. ANCHOR BOLT A.C. ASPHALTIC CONCRETE A.F.F. ABOVE FINISH FLOOR A/C AIR CONDITIONER ACOUST ACOUSTICAL AL. ALUMINUM ALUM ALUMINUM ARCH ARCHITECTURAL B.O.C. BOTTOM OF COPING B.U.R. BUILT UP ROOFING BD BOARD BLDG BUILDING BLK BLOCK OR BLOCKING BOT BOTTOM C.I. CAST IRON C.J. CEILING JOIST C.L. CHAIN LINK C.L.F. CHAIN LINK FENCE C.M.U. CONCRETE MASONRY UNIT C.T. CERAMIC TILE CAB CABINET CER CERAMIC CLG CEILING CLO. CLOSET CLR CLEAR COL COLUMN CONC CONCRETE CONST CONSTRUCTION CONT CONTINUOUS d PENNY D.F DOUGLAS FIR DBL DOUBLE DEMO DEMOLITION DET DETAIL DIA. DIAMETER DIM DIMENSION DIV DIVISION DR DOOR DS DOWNSPOUT DWG DRAWING E.J. EXPANSION JOINT E.W.C. ELECTRIC WATER COOLER EA EACH ELEC ELECTRICAL EQ EQUAL EQUIP EQUIPMENT EXH EXHAUST EXIST EXISTING EXP EXPANSION EXT EXTERIOR F.D. FLOOR DRAIN F.E. FIRE EXTINGUISHER F.E.C. FIRE EXTINGUISHER CABINET F.F. FINISH FLOOR F.G FINISH GRADE F.H.C. FIRE HOSE CABINET F.O.C. FACE OF CONCRETE F.O.S. FACE OF STUD F.O.W. FACE OF WALL F.R. FIRE RATED, FIRE RESISTANT F.S. FINISHED SURFACE FIN FINISH FLR FLOOR FR. FRAME FT FOOT OR FEET FTG FOOTING G.I. GALVANIZED IRON G.W.B. GYPSUM WALLBOARD GA GAUGE GALV GALVANIZED GEN GENERAL GYP GYPSUM H.M. HOLLOW METAL HDB HARDBOARD HDR HEADER ABBREVIATIONS <AREA FOR BUDLONG LOGO> PLANCHECK SUBMITAL 03/17/20 601 TYPICAL ACCESSIBLE PLUMBING FIXTURES NOTES 1. TOILET FLUSH CONTROLS SHALL BE OPERABLE WITH ONE HAND, AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. CONTROLS FOR THE FLUSH VALVES SHALL BE MOUNTED ON THE WIDE SIDE OF THE TOILET AREA AS INDICATED AND 36" MAXIMUM ABOVE FINISH LOOR. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5-POUNDS. 2. HOT WATER AND DRAIN PIPES UNDER LAVATORIES SHALL BE INSULATED OR OTHERWISE COVERED. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES. 3. FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT EQUIRE TIGHT GRASPING, PINCHING OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5-POUNDS. LEVER OPERATED, PUSH TYPE AND LECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES OF ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE FAUCET REMAINS OPEN FOR AT LEAST 10 SECONDS. 4. A GRAB BAR OR ANY WALL OR OTHER SURFACE ADJACENT TO IT SHALL BE FREE OF ANY SHARP OR ABRASIVE ELEMENTS. 5. GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS. 6. EDGES SHALL HAVE A MINIMUM RADIUS OF 1/8 INCH. 7. WHERE LOCKERS ARE PROVIDED FOR PUBLIC, CLIENTS, EMPLOYEES, MEMBERS OR PARTICIPANTS, AT LEAST ONE AND NOT LESS THAN FIVE PERCENT OF ALL LOCKERS SHALL BE MADE ACCESSIBLE TO THE PHYSICALLY DISABLED. A PATH OF TRAVEL NOT LESS THAN 36-INCHES IN CLEAR WIDTH SHALL BE PROVIDED TO THESE LOCKERS. 8. THE DRINKING FOUNTAIN SHALL BE ACTIVATED BY A CONTROL WHICH IS EASILY OPERATED BY A DISABLED PERSON SUCH AS A HAND OPERATED LEVER TYPE CONTROL LOCATED WITHIN 6-INCHES OF THE FRONT OF THE DRINKING FOUNTAIN. THE SPOUT SHALL BE LOCATED 15-INCHES MINIMUM FROM THE VERTICAL SUPPORT AND 5-INCHES MAXIMUM FROM THE FRONT EDGE OF THE UNIT, INCLUDING BUMPERS, AND SHALL BE 36-INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. THE WATER STREAM FROM THE SPOUT SHALL PROVIDE A FLOW OF WATER 4 INCHES HIGH MIN. AND BE SUBSTANTIALLY PARALLEL TO THE FRONT OF THE DRINKING FOUNTAIN. 9. ROUGH-IN FOR FIXTURES, EQUIPMENT, AND APPLIANCES SHALL BE AS INDICATED ON DRAWINGS AND AS SPECIFIED, INCLUDING THOSE ITEMS INDICATED AS FURNISHED BY OTHERS, FURNISHED BY OWNER, OR FUTURE CAPACITY. WHEN CONNECTIONS TO EQUIPMENT FROM CAPPED OR PLUGGED LINES ARE REQUIRED, CAPS OR PLUGS SHALL BE REMOVED AT TIME EQUIPMENT IS SET AND STOPS OR VALVES INSTALLED AND CONNECTIONS PROVIDED AS SPECIFIED. 10. UNLESS OTHERWISE INDICATED, FIXTURES SHALL BE INSTALLED WITH 5/16" BRASS BOLTS OR SCREWS OF SUFFICIENT LENGTH TO SECURE FIXTURE TO BACKING, WALL OR CLOSET RINGS. 11. FIXTURES INSTALLED AGAINST CONCRETE OR MASONRY WALLS SHALL HAVE THEIR HANGERS FASTENED WITH THE 5/16" BOLTS, PHILIP SHIELD TYPE ANCHORS, OR 2 UNIT CINCH ANCHORS. WOOD OR PLASTIC PLUGS ARE NOT PERMITTED. 12. BACKING FOR HANGING OF PLUMBING FIXTURE AND EQUIPMENT SHALL BE INSTALLED IN SUPPORTING WALL AT TIMES ROUGH PIPING IS INSTALLED. 13A. FOR WOOD STUDS USE STEEL PLATE 1/4" THICK, NOT LESS THAN 4 TO 6 INCHES WIDE STEEL PLATE SHALL BE ATTACHED TO STUD AT EACH END OF PLATE TO EACH STUD IT CROSSES. PLATE SHALL HAVE 2 PRE-DRILLED 1/8" HOLES FOR No.14 FLAT HEAD SCREWS 2 INCHES IN LENGTH FROM EACH STUD. 13B. FOR METAL STUDS USE STEEL PLATE 1/4" THICK, NOT LESS THAN 4 INCHES WIDE STEEL PLATE SHALL BE ATTACHED TO STUD AT EACH END OF PLATE TO EACH STUD IT CRESSES. PLATE SHALL BE \ ATTACHED TO METAL STUDS BY BOLTING WITH TWO 1/4" "U BOLTS" PER STUD WITH BOLTS THROUGH PLATE AND AROUND STUD FLANGE OR BY WELDING WITH 1/8" FILLET WELD FULL WIDTH OF STUD FLANGE, TOP AND BOTTOM OF PLATE. 14. PIPING SHALL BE STUBBED OUT TO EXACT LOCATION OF FIXTURES AND STUBS SHALL BE INSTALLED SYMMETRICAL WITH FIXTURES. HOT AND COLD WATER SUPPLIES FOR CENTER SET FAUCETS ON LAVATORIES SHALL BE INSTALLED ON 8 INCH CENTERS, UNLESS OTHER WISE SPECIFIED OR REQUIRED. ACCESSORIES INFORMATION 1. THE GRAB BAR SHALL NOT PROJECT MORE THAN 3" INTO THE 48" MINIMUM CLEAR SPACE IN FRONT OF THE WATER CLOSET. GRAB BAR AND CONNECTIONS SHALL HAVE STRENGTH TO ALLOW 250 LB HORIZONTAL OR VERTICAL POINT FORCE. 2. TOILET PAPER AND FEMININE NAPKIN DISPENSERS LOCATED AT THE GRAB BAR SIDE OF AN ACCESSIBLE TOILET ROOM OR STALL SHALL NOT PROJECT MORE THAN THE GRAB BAR. THE ACCESSORY SHALL NOT BE LOCATED CLOSER THAN 1 1/2" CLEAR OF THE TANGENT POINT OF THE GRAB BAR. 32" END DOOR CONDITION 34" SIDE DOOR CONDITION TOILET TISSUE DISPENSER REINFORCE WALL @ 42" MIN. SIDE MOUNT GRAB BAR 1 1/4" -1 1/2" DIA. ACCESSIBLE SINK CABINET SECTION METAL SHELF WITH SUPPORT BRACKETS METAL RIMMED MIRROR SIZED PER ELEVATION TYPICAL ACCESSORY ELEVATION HEIGHTS ALCOVE WALL (TYPICAL) DRINKING FOUNTAIN SECTION VIEW WALL MOUNT SOAP DISPESER TOILET SEAT COVER DISPENSER (ALIGN BELOW REAR GRAB BAR) TOP OF SEAT REINFORCE WALL @ 36" REAR MOUNT GRAB BAR 1 1/4" -1 1/2" DIA. FRONT ELEV. TOILET ACCESSIBLE SINK CABINET PLAN 30" x 48" CLEAR FLOOR SPACE ACCESSIBLE SINK CABINET ELEV. SIDE ELEV. TOILET DRINKING FOUNTAIN PLAN VIEW BUBBLER HGT. DRINKING FOUNTAIN ELEVATION LAV. SIDE ELEVATION LAV. FRONT ELEVATION SOAP DISPENSER MIRROR CENTER OVER SINKALCOVE (TYPICAL) 48" x 30" CLEAR FLOOR SPACE ADJACENT WALL AS OCCURS 30" x 48" CLEAR FLOOR SPACE LAVATORY PLAN VIEW TOP OF URINAL LIP TOILET/STALL PLAN VIEW FRONT ELV. URINAL SIDE ELEV. URINAL 30" x 48" CLEAR FLOOR SPACE PLAN VIEW URINAL SINGLE ACCOMODATION TOILET PLAN VIEW BUBBLER (AS OCCURS)AREA NOT HATCHED BELOW SINK SHALL BE ACCESSIBLE AND CLEARTOP OF BARA= 34 1/2"A= 18"A= 17 1/2"19" MIN.A= 18"8"19" MINMAX. 12"TOP OF BARA = 34 1/2"49" MIN. @ END DR. STALL COND.60" MIN. @ SIDE STALL COND.A= 17 1/2" 61" MIN. CLR 6" MIN. 18" MIN. 19" MIN.(LAUSD ONLY)A= 17 1/2" M IN . C LR .60" D IA.MIN. 18". CLR. 32" MIN.CLEAR48" MIN.A= 16"15".SINK DEPTHMAX. 6 1/2"5" MAX.A= 27" MIN.APRON29" MIN.A= 34" MAX.A= 34" MAX.APRON29" MIN.1' - 7"34" MAX. @ OPEN SPACE39" @ LAVATORY2"17" MIN. TOE CLR. 6" MAX.APRONA= 29" MIN.A= 34" MAX.19" MIN. (LAUSD ONLY) 18" MIN. CLR. AT WALL COND.27" MIN.36" MAX.40".18 1/2".18" MIN.CLR. 18" MIN.25" MIN.MIN.25"9" MIN.4" MAX.CLR. 15" MIN.5" MAX. 9" HIGH TOE CLR. BELOW PARTITION A= 40" MAX.6" MAX.9" MIN.60" MIN. CLR. 2" MIN. CLEAR BETWEEN DISPENSER & GRAB BAR TO TISSUE OUTLET .CLR.18" MIN.8" MIN. 6" MAX. 17" MIN. A= 39" MAX. TO BOTTOM OF REFLECTIVE SURFACE ADULT HI-LO DRINKING FOUNTAIN HI-LO DRINKING FOUNTAIN 36" MAX. TO TOP OF BAR IF TANK IS USED A= 43"CLEAR9" MIN.THAN 24"LESS6" MIN.MORE24" ORA= 34" MAX.APRONA= 29" MIN.KNEE SPACEA= 27" MIN.KNEE CLR. 8" MIN.A= 27" MIN.KNEE SPACEA= 39" MAX.STANDARD ADULT 24" MIN.. FLUSH ACTIVATOR ON WIDE SIDE TYP.MIN.2" CLR.PROJECTION 3" MAX.2" CLRFLUSH ACTIVATOR ON WIDE SIDE TYP.13" - 15"4' - 0"74" MIN.PAPER TOWEL DISPENSER ELECTRIC HAND DRYER PAPER TOWEL DISPENSER AND WASTE RECEPTACLE SANITARY NAPKIN DISPENSER TOILET SEAT COVER DISPENSER + TOILET TISSUE DISPENSER + SANITARY NAPKIN DISPOSAL SANITARY NAPKIN DISPENSER FINISH FLOOR A= 40" MAX.DIMENSION LEGEND A = ADULT DIMENSIONS (AGE 12 AND OVER) DIMENSIONS IN INCHES a) TOILET CENTERLINE FROM WALL b) TOILET SEAT HEIGHT TO TOP OF SEAT c) GRAB BAR HEIGHT (TO TOP SURFACE) d) TOILET PAPER DISPENSER HEIGHT e) TOILET PAPER IN FRONT OF TOILET f) NAPKIN DISPOSAL IN FRONT OF TOILET g) DISPENSER HEIGHT h) MIRROR HEIGHT (OVER A LAVATORY) i) MIRROR HEIGHT (ISOLATED MIRROR) j) LAVATORY/SINK TOP HEIGHT k) LAVATORY APRON CLEARANCE l) LAVATORY/SINK KNEE CLEARANCE m) URINAL LIP HEIGHT n) URINAL, TOILET FLUSH HANDLE HEIGHT o) DRINKING FOUNTAIN BUBBLER HEIGHT p) DRINKING FOUNTAIN KNEE CLEARANCE q) RAMP/STAIR HANDRAIL HEIGHT 17 1/2" 18" 34 1/2" 19" MIN. 8" 12" MAX. 40" MAX. 39" 34" 34" MAX. 29" MIN. 27" MIN. 16" 43" 36" MAX. 27" MIN. 36" A A = ADULT DIMENSIONS (AGE 12 AND OVER) EEC = EARLY EDUCATION CENTER DIMENSIONS .48" MIN. (LAUSD ONLY) 42" MIN. 25" MIN. (LAUSD ONLY) 24" MIN. 54" MIN. 12" MIN.24" MIN. 42" MIN. (LAUSD ONLY) 36" MIN. IF PIPES ARE EXPOSED PROVIDE INSULATION EEC 30" MAX. 22" MIN. WALL OR PARTITION WALL FACE OF WALL OR PARTITION 4" MAX.60" MIN. CLEAR OF FLUSH VALVE HANDLE 37" CLR. IF PARTITION, EDGE OF URINAL 33" CLR. IF PARTITION, EDGE OF URINAL SCREEN OR WALL IS LESS THAN 24" SCREEN OR WALL IS 24" OR MORE 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET: G003 01.02.20 SAN WJA 19-BUD-005 799 Moorpark Ave. Moorpark, CA 93021 ACCESSIBILITY DETAILS CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION WJA CONSTRUCTION DOCUMENTSLICENSED RENEWAL DATE JANUARY 31, 2021 ARC H T ECTI C-20348 STAT E OF CA L IF O R NIARJOGE WILLIAM A MADOR<AREA FOR BUDLONG LOGO> PLANCHECK SUBMITAL 03/17/20 602 SS SS A401 1 OPEN OFFICE 103 COPY ROOM 102 LOBBY 101 OPEN OFFICE 104 OPEN OFFICE 105 VESTIBULE 106 VESTIBULE 107 MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 OFFICE 111 LUNCH ROOM 110 JAN 121 OFFICE 112 OFFICE 113 OFFICE 114 OFFICE 115 OFFICE 116 OFFICE 117 OFFICE 118 OFFICE 119 COMPUTER ROOM 120 A401 2 LOBBY 101 COPY ROOM 102 OPEN OFFICE 103 OPEN OFFICE 104 OPEN OFFICE 105 VESTIBULE 106 VESTIBULE 107 MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 LUNCH ROOM 110 OFFICE 111 OFFICE 112 OFFICE 113 OFFICE 114 OFFICE 115 OFFICE 116 OFFICE 117 OFFICE 118 OFFICE 119 COMPUTER ROOM 120 JAN 121 GENERAL NOTES THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED PER THE VENTURA COUNTYWIDE MUNICIPAL STORMWATER NPDES PERMIT NO. CA S004002. NO SOLID WASTE, PETROLEUM BYPRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS, OR WASTEWATER GENERATED IN CONSTRUCTION SITES OR BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM. 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET: A101 01.02.20 SAN WJA 19-BUD-005 799 Moorpark Ave. Moorpark, CA 93021 DEMOLITION & NEW PLANS CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION WJA CONSTRUCTION DOCUMENTSLICENSED RENEWAL DATE JANUARY 31, 2021 ARC H T ECTI C-20348 STAT E OF CA L IF O R NIARJOGE WILLIAM A MADOR1/8" = 1'-0"1 MOORPARK ADMINISTRATION BLDG. DEMO PLAN <AREA FOR BUDLONG LOGO> 1/8" = 1'-0"2 MOORPARK ADMINISTRATION BLDG. NEW PLAN NORTHNORTH0'4'8'16'32' 0'4'8'16'32' PLANCHECK SUBMITAL 03/17/20 603 SS(E) 56 3/4" (E) 19 3/8"(E) 34 5/8" (E) 34 5/8" D.01 D.01 D.04 D.05 D.02 D.02 D.03 D.06 D.07 E.10 E.06 D.09 D.08 D.01D.13 (E) 56 3/4" D.14 D.14 D.04 D.05(E) 18 5/8" D.08 (E) 45 7/8"(E) 45"D.05 E.03 D.09 D.10 D.10 D.11(E) 60"(E) 60"E.03MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 D.12 D.12 A401 3N 3 3S 3W A401 4N 4 4S 4W E E MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 31" MIN. CLR. 60" 22" 22" 24" MIN. CLR. 60" 17 1/2" 17 1/2" 31" 18"18" 18"18"B B 22.01 22.01 22.02 10.01 10.01 10.02 H H 36" MIN. CLR. MIN. CLR. 36" D D E G G D B E F F F 30" x 48" maneuver space 30" x 48" clr. space 30" x 48" clr. space 44" MIN.44" MIN.76 1/2" .78 1/2" .21"21"18"10.03 10.03 C C 9.03 A A 3.01 3.01 9.03 4 A501 4 A501 48" MAX. A.F.F. 48" MAX. A.F.F. 22.03 22.04 22.04 22.01 10.01 34"22.02 E.03 36"C 17"57 1/2"(N) TILE JOIN AT (E) GROUT LINE REFRAME AND ADD BLOCKING AS NECESSARY FOR (N) AIR HAND DRYER E.05 E.10 22.01 G 34" MAX.22.02 E.05 9.0139"J A 2 A501 43 1/2"9.02 (N) TILE JOIN AT (E) GROUT LINE ± 60" 22.03 10.01 9.01 D H B 1 A501 43 1/2"9.02 (N) TILE JOIN AT (E) GROUT LINE ± 68" DASHED FOR CLARITY 22.01 22.01 E.10 10.01 10.01 G E.05 34" MAX.22.02 9.01 J 39"A 1 A501 2 A50143 1/2"9.02 (N) TILE JOIN AT (E) GROUT LINE ± 60" D 22.01 E.03 34"22.02 36"C 19 1/2" (N) TILE JOIN AT (E) GROUT LINE 53 1/4"REFRAME AND ADD BLOCKING AS NECESSARY FOR (N) AIR HAND DRYER E.10 10.01 10.01 9.01 E BD H 43 1/2"9.02 (N) TILE JOIN AT (E) GROUT LINE ± 72" DASHED FOR CLARITY 22.01 ACCESSORIES SCHEDULE A LIQUID SOAP DISPENSER B TOILET PAPER DISPENSER C ELECTRIC PAPER TOWEL DISPENSER, SEMI-RECESSED D TOILET SEAT COVER DISPENSER E NAPKIN DISPOSAL F COAT HOOK G 36" STAINLESS STEEL GRAB BAR H 42" STAINLESS STEEL GRAB BAR J MIRROR, SIZE TO MATCH EXISTING FOR ACCESSORIES MOUNTING HEIGHT SEE SHEET G0.03. - RESTROOM LEGEND INDICATES 59" x 60" CLEAR SPACE INDICATES 60" DIAMETER CLEAR SPACE DEMOLISH EXISTING TILES GENERAL NOTES 1. REMOVE WALL AND FLOOR TILE AS INDICATED IN DRAWINGS TO ACCOMODATE THE SCOPE OF WORK AND REPLACE WITH NEW MATERIALS. 2. PROVIDE SOLID BLOCKING 2x MINIMUM AT GRAB BARS, TYP. 3.REFRAME AREAS OF DEMO'D PAPER TOWEL DISPENSER, ADD BLOCKING 2x MINIMUM AT NEW AIR HAND DRYUER, AND PATCH AREA WITH NEW TILES. 4.THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED PER THE VENTURA COUNTYWIDE MUNICIPAL STORMWATER NPDES PERMIT NO. CA S004002. NO SOLID WASTE, PETROLEUM BYPRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS, OR WASTEWATER GENERATED IN CONSTRUCTION SITES OR BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM. 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET: A401 01.03.20 SAN WJA 19-BUD-005 799 Moorpark Ave. Moorpark, CA 93021 ENLARGED RESTROOM DEMO, NEW PLANS & INTERIOR ELEVATIONS CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION WJA CONSTRUCTION DOCUMENTS 3/8" = 1'-0"1 ENLARGED RESTROOMS DEMO PLAN 3/8" = 1'-0"2 ENLARGED RESTROOMS NEW PLANNORTH 0'2'4'8'16' 3/8" = 1'-0"3 MEN'S RESTROOM INTERIOR ELEVATIONS 3/8" = 1'-0"4 WOMEN'S RESTROOM INTERIOR ELEVATIONS 3N3S 3E3W 4N4S 4E4W <AREA FOR BUDLONG LOGO> EXISTING KEYNOTES E.03 (E) MIRROR TO REMAIN E.05 (E) ACCESS PANEL E.06 (E) WALL OCCUPANCY SENSOR SWITCH E.07 (E) SOAP DISPENSER TO REMAIN E.08 (E) GRAB BAR TO REMAIN E.10 (E) VANITY LIGHT FIXTURE DEMOLITION KEYNOTES D.01 DEMOLISH (E) WATER CLOSET D.02 DEMOLISH (E) TOILET PARTITION D.03 DEMOLISH (E) URINAL SCREEN D.04 DEMOLISH (E) GRAB BAR D.05 DEMOLISH (E) TOILET ACCESSORIES D.06 DEMOLISH (E) LAVATORY D.07 DEMOLISH (E) LAVATORY COUNTER D.08 DEMOLISH (E) MIRROR & SHELF D.09 DEMOLISH (E) SOAP DISPENSER D.10 DEMOLISH (E) CONCRETE SLAB WHERE REQUIRED AND PROVIDE CONNECTION TO (E) WASTE LINE D.11 DEMOLISH (E) WALL TILE FOR BACKER FOR INSTALLLATION OF PLUMBING AND BLOCKING D.12 DEMOLISH (E) PAPER TOWEL DISPENSER D.13 DEMOLISH (E) URINAL D.14 DEMOLISH (E) FLOOR DRAIN KEYNOTES 3.01 (N) CONCRETE SLAB ON GRADE 9.01 (N) 4" CERAMIC TILES 9.02 (N) 1" COVE 9.03 (N) 2" CERAMIC TILES 10.01 (N) TOILET PARTITION 10.02 (N) 18" URINAL SCREEN 10.03 REMOVE (E) DOOR CLOSER AND REPLACE WITH (N) CLOSER 22.01 (N) WATER CLOSET 22.02 (N) LAVATORY 22.03 (N) URINAL 22.04 (N) FLOOR DRAIN LICEN S E D RENEWAL DATE JANUARY 31, 2021 ARC H T ECTI C-20348 STAT E OF CA L IF O R NIARJOGE WILLIAM A MADORPLANCHECK SUBMITAL 03/17/20 604 3 #1 0 x 3 -1 /2 " S C R E W S , M IN . 2 " P E N E T R A T IO N 36" LONG BAR AT BACK OF WATER CLOSET AND 42" LONG BAR AT SIDE OF WATER CLOSET. 24" CLEAR FROM FRONT FACE OF WATER CLOSET TO END OF SIDE GRAB BAR. THE GRAB BAR AND THE NECESSARY BACKING SUPPORT SHALL BE SUFFICIENT TO SUPPORT THE 250 POUND POINT LOAD AS SPECIFIED IN CBC 11B-609.8. (E ) O R (N ) 2 " x 6 " S T U D @ 1 6 " O .C . (T Y P .) NOTES: 1. 2. 3. 4 " x 6 " B L O C K IN G W / A 3 4 T O P & B O T T O M E A . E N D T Y P .S P A C E R S L E E V E T H R U G Y P . B D ., T Y P .34" MAX.11"9" MIN.17" MIN. KNEE CLR. 8" MIN. TOE CLR. 6" MAX.KNEE SPACE27" MIN.FROM BOTTOM OF APRON TO F.F.29" MIN.SOLID SURFACING COUNTERTOP & INTEGRAL SINK (CORIAN OR EQUAL) ON PLYWOOD BACKING 21" BULLNOSE EDGE SINK LAVATORY KNEE AND TOE CLEARANCE, SEE A501 35"FROM BOTTOM OF APRON TO F.F.29" MIN.34" MAX.4"#14 R.H.W.S. (7X DIA. MIN. EMBED 12" O.C. & 2" FROM END OF UNIT 3X6 (4X4 WHERE OCCURS) CONTINUOUS BLOCKS WITH SIMPSON A34 TOP & BOTTOM EACH END BETWEEN STUDS NEW CONCRETE(E) CONCRETE DRILL FOR #4 DOWEL @ 16" O.C. w/ 4" EMBED. PROVIDE SIMPSON 'SET-XP' EPOXY ANCHOR (ICC-ESR-2508) 4" THK CONCRETE SLAB w/ #4 @ 16" O.C. EACH WAY, TYP. (E) 4"4".24"4"2"4" CRUSHED AGGREGATED BASE COMPACTION TO 90% OF MAXIMUM DENSITY FLUSH PATCH (E) VAPOR BARRIER WHERE OCCURS (10 MIL. VISQUEEN MIN. w/ 4" OVERLAP & INDUSTRIAL GRADE SEAL TAPE) 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET: A501 01.02.20 SAN WJA 19-BUD-005 799 Moorpark Ave. Moorpark, CA 93021 DETAILS CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION WJA CONSTRUCTION DOCUMENTSLICENSED RENEWAL DATE JANUARY 31, 2021 ARC H T ECTI C-20348 STAT E OF CA L IF O R NIARJOGE WILLIAM A MADOR<AREA FOR BUDLONG LOGO> 3" = 1'-0"1 GRAB BAR DETAIL 1 1/2" = 1'-0"3 MIN. LAVATORY KNEE & TOE CLEARANCES 1 1/2" = 1'-0"2 LAVATORY DETAIL 1 1/2" = 1'-0"4 NEW CONCRETE SLAB TO (E) PLANCHECK SUBMITAL 03/17/20 605 Appendix III APPENDIX III ELECTRICAL PLAN SET 606 1"C. 6 #10 + #12 GND. 3/4"C. 3#12, + #12 GND. 3/4"C. 5 #10 + #12 GND. 3/4"C. 2 #12 + #12 GND. 1 A-1,3,5 (NOT ALL SYMBOLS ARE USED ON PLANS) CONDUIT: IN OR BELOW FLOOR OR BELOW GRADE. SIZE & NUMBER REFERENCE NOTE TAG. OF CONDUCTORS AS NOTED. 3/4"C. 4#12, + #12 GND. HOMERUN TO PANEL "A", CIRCUITS 1,3,5. EQUIPMENT GROUNDING CONDUCTOR IS NOT REPRESENTED IN THE CROSS MARKS BUT IS TO BE INCLUDED IN ALL RACEWAYS. (NO CROSS LINES INDICATE (2)#12 1. CONSULT WITH THE OAR BEFORE STARTING WORK. 2. NO CONDUITS ARE TO BE INSTALLED ON ARCADES OR ROOF U.O.N. ALL EXPOSED CONDUITS, SUPPORTS AND JUNCTION BOXES SHALL BE PAINTED TO MATCH THE PREDOMINANT COLOR OF THE BUILDING, AS APPROVED BY OAR AND ENGINEER OF RECORD, EXCEPT WIREMOLD. 3. WIREMOLD SHALL BE WITH THE FACTORY FINISH MOST CLOSELY MATCHING THE COLOR OF WALL ON WHICH WIREMOLD IS TO BE INSTALLED. DO NOT PAINT WIREMOLD. 4. COORDINATE THE ELECTRICAL WORK WITH THE WORK OF OTHER TRADES. 5. WHERE STRUCTURAL WALLS ARE CORED FOR NEW CONDUIT RUNS, SEPARATION BETWEEN CORED HOLES SHALL BE THREE INCHES FROM NEW HOLES, UNLESS DIRECTED OTHERWISE BY THE OAR. PROVIDE X-RAY TO PROTECT REBAR. STRUCTURAL ENGINEER APPROVAL IS REQUIRED FOR REBAR CUTTING OR REMOVAL. 6. ALL FEEDERS AND BRANCH CIRCUITS SHALL CARRY A GROUND WIRE, SIZED AS PER N.E.C. ARTICLE 250. 7. PRIOR TO PULLING ANY CONDUCTORS, CLEAN AND MANDREL ALL CONDUITS. 8. CONTRACTOR SHALL INSTALL EQUIPMENT PER ADA (AMERICAN DISABILITIES ACT) REQUIREMENTS. 9. EXTERIOR EQUIPMENT, JUNCTION BOXES, ENCLOSURES AND CONNECTIONS SHALL BE WEATHERPROOF TYPE SUITABLE FOR EXTERIOR INSTALLATION. 10. COORDINATION: A.IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE CONSTRUCTION DOCUMENTS, THE FEATURES SHALL BE OF THE SAME CHARACTER AS SIMILAR CONDITIONS THAT ARE SHOWN. 14. ALL DIMENSIONS, ELEVATIONS AND EXISTING CONDUITS SHALL BE VERIFIED ON THE SITE BY GENERAL CONTRACTOR, AND EACH SUB-CONTRACTOR BEFORE THE WORK BEGINS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE OAR'S ATTENTION BEFORE CONSTRUCTION BEGINS. FAILED TO VERIFY EXISTING PHYSICAL CONDITIONS WILL NOT CONSTITUTE GROUNDS FOR SUBSEQUENT CHANGE ORDER REQUESTS. 15. THE ENGINEER HAS PREPARED THESE DOCUMENTS ONLY FOR IMPROVEMENTS SPECIFIED, DETAILED OR SHOWN AS NEW WORK, AND ASSUMES NO RESPONSIBILITY FOR OTHER CONSTRUCTION, MATERIAL OR EQUIPMENT NOTED AS "PROVIDED BY OTHERS". 16. PROVIDE NYLON PULL CORD OR STRINGS IN ALL EMPTY CONDUITS. 17. ALL JUNCTION BOX COVER PLATES FOR BRANCH CIRCUIT SYSTEM SHALL BE CLEARLY MARKED WITH PERMANENT INK FELT PEN IDENTIFYING THE BRANCH CIRCUIT (BOTH PANEL NUMBER AND CIRCUIT NUMBER) CONTAINED IN THE BOX. 18. THE CONTRACTOR SHALL MAINTAIN THE UNIFORMITY AND CONTINUITY OF THE GROUNDING SYSTEM IN ALL CONDUITS/RACEWAYS. 19. TEST THE ENTIRE SYSTEM TO DEMONSTRATE TO THE OAR THAT THE ELECTRICAL COMPONENTS AND SPECIAL SYSTEMS ARE COMPLETE AND FUNCTION PROPERLY. MAKE NECESSARY CORRECTIONS AND LEAVE SYSTEMS READY FOR OPERATION. 20.EXPOSED CONDUITS SHALL BE INSTALLED ALONG MECHANICAL PIPES. INSIDE BUILDING THE EXPOSED CONDUITS UP TO 7'-0" SHALL BE RIGID STEEL AND ABOVE 7'-0" MAY BE EMT. ALL EXPOSED EXTERIOR CONDUITS SHALL BE RIGID STEEL. THREADLESS CONNECTORS & COUPLINGS SHALL NOT BE USED. CONDUIT LARGER THAN 1 1/4" SHALL BE GALVANIZED RIGID CONDUIT. ALL EXPOSED CONDUITS, RACEWAYS, AND BOXES SHALL BE PAINTED TO MATCH THE SURFACE WHERE INSTALLED. 21.DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND THE SIZE AND LOCATION OF EQUIPMENT IS INDICATED TO SCALE WHENEVER POSSIBLE. COORDINATE LOCATION AND LAYOUT WITH OTHER WORK. CONTRACTOR SHALL PROVIDE TO THE ENGINEER A 1 4"=1'-0" SCALED DRAWING OF ELECTRICAL EQUIPMENT ROOMS SHOWING LOCATION AND CLEARANCES OF SUBMITTED EQUIPMENT FOR REVIEW AND APPROVAL PRIOR TO ORDERING OF ELECTRICAL EQUIPMENT. 22.PER CEC 300-21, "OPENINGS AROUND ELECTRICAL PENETRATIONS THROUGH FIRE-RESISTANT-RATED WALLS, PARTITIONS, FLOORS, CEILINGS SHALL BE FIRESTOPPED USING APPROVED METHODS TO MAINTAIN THE FIRE RESISTANCE RATING." 23. ALL CONDUCTORS FOR FEEDERS AND BRANCH CIRCUITS SHALL BE COPPER, TYPE THWN/THHN, RATED FOR 75°C. SIZES #12 AWG MAY BE SOLID OR STRANDED, #10 AND LARGER SHALL BE STRANDED. PROVIDE 75°C RATED AND APPROVED TERMINATION FOR ALL CONDUCTORS. 24. ALL ELECTRICAL WORK SHALL BE PER THE APPLICABLE NEC CODE. CONTRACTOR SHALL INCLUDE IN HIS BID ALL REQUIRED LABOR, MATERIAL, EXPERTISE AND QUALIFIED PERSONNEL TO COMPLETELY INSTALL IN A CODE COMPLIANT MANNER, ALL WORK SHOWN ON THE PLANS OR REFERRED TO IN THE SPECIFICATIONS. 25. WHEN THERE ARE DISCREPANCIES BETWEEN CONTRACT DOCUMENTS (DRAWINGS AND/OR SPECIFICATIONS), OBTAIN CLARIFICATION FROM THE ENGINEER PRIOR TO BID. FOR BIDDING PURPOSES THE MORE STRINGENT OR MORE EXPENSIVE REQUIREMENT(S) SHALL APPLY. 26.DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN A DAILY RECORD OF ALL DEVIATIONS FROM THE BID DRAWINGS. ALL DIMENSIONS AND OTHER INFORMATION NECESSARY TO COMPLETELY EXPLAIN AND LOCATE ALL ELEMENTS OF THESE DEVIATIONS SHALL BE RECORDED. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL SUBMIT TO THE DISTRICT, ONE COMPLETE SET OF REPRODUCIBLE DRAWINGS CORRECTED TO REFLECT "AS-BUILT" CONDITIONS OF THE WORK, AND ONE DIGITAL SET SUBMITTED ON A THUMB DRIVE. 27. ANY SUBMITTALS FOR EQUIPMENT DIFFERENT FROM THE SPECIFIED ITEMS SHOWN ON THE PLANS SHALL BE ACCOMPANIED BY CUT SHEETS FOR THE ORIGINAL SPECIFIED ITEM(S). SUBMITTALS WITHOUT THE SPECIFIED CUT SHEETS WILL BE REJECTED AS INCOMPLETE. 28. CONDUIT INSTALLED BELOW EXISTING SLAB-ON-GRADE SHALL BE LOCATED BELOW BOTTOM OF EXISTING SLAB. 29. "PROVIDE" SHALL BE DEFINED AS: FURNISH AND INSTALL. 30. ALL MATERIALS, EQUIPMENT, CONDUIT AND WIRING SHALL BE NEW AND PROVIDED BY THE CONTRACTOR. REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS FOR EQUIPMENT AND MATERIAL APPROVED FOR USE UNDER THIS CONTRACT. 31. ALL DIMENSIONS AND ELEVATIONS SHALL BE CHECKED AND VERIFIED ON THE SITE BY THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR BEFORE THE WORK BEGINS. ALL PERCEIVED ERRORS, OMISSIONS AND DISCREPANCIES SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION BEFORE CONSTRUCTION BEGINS. 32. ALL RACEWAYS INSIDE OF BUILDING SHALL BE CONCEALED. INCLUDE ALL REQUIRED DEMOLITION, CUTTING, PATCHING AND FINISH TO MATCH EXISTING INSTALLATION AS REQUIRED TO INSTALL NEW CONDUIT AND RACEWAYS IN EXISTING BUILDING. 33. ALL CONDUIT PENETRATIONS THROUGH FIRE-RATED FLOOR SLABS, SHAFTS AND WALLS SHALL BE SEALED AGAINST THE SPREAD OF FIRE OR SMOKE WITH APPROVED CABLE & CONDUIT FIRE STOPS OR FIRE RESISTANT SEALANT TO GIVE THE EQUIVALENT FIRE RATING OF THE STRUCTURE BEFORE THE PENETRATION. ALL OTHER NON-RATED PENETRATIONS OF STRUCTURES SHALL BE SEALED. 34.EXPOSED AND CONDUITS ABOVE T-BAR CEILINGS SHALL BE INSTALLED PARALLEL TO OR AT RIGHT ANGLES TO EXISTING BEAMS OR WALLS. EXPOSED CONDUITS UP TO 7'-0" ABOVE FINISH FLOOR SHALL BE RIGID GALVANIZED STEEL AND ABOVE 7'-0" MAY BE EMT. 35.PROVIDE ELECTRICAL PANELS WITH TYPEWRITTEN "AS-BUILT" PANEL SCHEDULE. PANEL SCHEDULE SHALL INCLUDE LOCATION, QUANTITY AND TYPE OF DEVICES SERVED. 36.PROVIDE ELECTRICAL PANELS WITH ENGRAVED NAMEPLATE ON OUTSIDE OF PANEL ABOVE DOOR OPENING. 37. SUPPORT CONDUIT 2-1/2 INCH TRADE SIZE OR SMALLER WITH U.L. LISTED CLAMPS AND HANGERS IN ACCORDANCE WITH SMACNA STANDARDS. 38.EQUIPMENT SPECIFIED ON THESE DRAWING ARE BASIS OF DESIGN ITEMS. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL ADDITIONAL DESIGN AND CONSTRUCTION COSTS INCURRED BY THE USE OF ANY PRODUCT OTHER THAN THE BASIS OF DESIGN. 39. ALL CIRCUIT BREAKER IN NEW PANEL TO BE CLEARLY LABELED WITH LABEL MACHINE CREATED LABEL. SYMBOL LIST GENERAL NOTES CONDUIT/CONDUCTOR TYPE CONDUIT EXPOSED IN UNFINISHED AREA OR ABOVE 9' IN FINISHED AREA; CONDUIT CONCEALED ABOVE CEILING IN FINISHED AREA; UNLESS OTHERWISE NOTED. ELECTRICAL PANEL ELECTRICAL SHEET INDEX NUMBER SHEET TITLE ELECTRICAL FRONT SHEETE101 SCOPE OF WORK PROVIDE POWER TO HAND DRYER FAN IN NEW RESTROOM. CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING PARTS OF TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR): PART 1 2019 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE, TITLE 24 C.C.R. PART 2 2019 CALIFORNIA BUILDING CODE (CBC), TITLE 24 C.C.R (2015 INTERNATIONAL BUILDING CODE OF THE INTERNATIONAL CODE COUNCIL WITH CALIFORNIA AMENDMENTS). PART 3 2019 CALIFORNIA ELECTRICAL CODE (CEC), TITLE 24 C.C.R. (2014 NATIONAL ELECTRIC CODE OF THE NATIONAL FIRE PROTECTION ASSOCIATION, NFPA) PART 4 2019 CALIFORNIA MECHANICAL CODE (CMC), TITLE 24 C.C.R. (2015 UNIFORM MECHANICAL CODE OF THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO). PART 5 2019 CALIFORNIA PLUMBING CODE (CMC), TITLE 24 C.C.R. (2015 UNIFORM PLUMBING CODE OF THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO). PART 6 2019 CALIFORNIA ENERGY CODE (CEC), TITLE 24 C.C.R. PART 9 2019 CALIFORNIA FIRE CODE (CFC), TITLE 24 (2015 INTERNATIONAL FIRE CODE OF THE INTERNATIONAL CODE COUNCIL). PART 10 2019 CALIFORNIA EXISTING BUILDING CODE, TITLE 24 C.C.R. (2015 INTERNATIONAL EXISTING BUILDING CODE OF THE INTERNATIONAL CODE COUNCIL WITH CALIFORNIA AMENDMENTS). PART 11 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN CODE), TITLE 24 C.C.R. PART 12 2019 CALIFORNIA REFERENCED STANDARDS, TITLE 24 C.C.R. PARTIAL LIST OF APPLICABLE STANDARDS: 2016 CALIFORNIA BUILDING CODE (FOR SFM) REFERENCED STANDARDS CHAPTER 35. NFPA 13 AUTOMATIC SPRINKLER SYSTEMS (CALIFORNIA AMENDED) 2019 EDITION NFPA 72, NATIONAL FIRE ALARM CODE (CALIFORNIA AMENDED)2019 EDITION (NOTE: SEE UL STANDARD 1971 FOR "VISUAL DEVICES") UL 521 HEAT DETECTORS FOR FIRE PROTECTIVE SIGNALING SYSTEMS 2019 EDITION APPLICABLE CODES ELECTRICAL NEW FLOOR PLANE201 BUDLONG & ASSOCIATES, INC M E P C O N S U L T I N G E N G I N E E R S Job No. GLENDALE OFFICE 315 ARDEN AVE, STE 23 GLENDALE, CA 91203 TEL: (818)638-8780 CAMARILLO OFFICE 400 W VENTURA BLVD, STE 240 CAMARILLO, CA 93010 TEL: (805)987-4001 DOWNTOWN-LA OFFICE 633W.5TH STREET 26TH FLOOR LOS ANGELES, CA 90071 TEL: (818)638-8780 19-334 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET:- Author Checker Project Number 799 Moorpark Ave. Moorpark, CA 93021 CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION Designer Project Status PLAN CHECK SUBMITTAL 03/17/2020 ELECTRICAL FRONT SHEET E101 607 SS OPEN OFFICE OPEN OFFICE 105 VESTIBULE 106 VESTIBULE 107 MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 LUNCH ROOM 110 OFFICE 111 OFFICE 112 OFFICE 113 OFFICE 114 OFFICE 115 JAN 121 (E) PANEL P P-18 P-20 1 1 3 3 2 2 1. NEW ELECTRICAL HAND DRYER.PROVIDE CONDUIT AND CONDUCTORS PER PLAN AND CAP FOR FUTURE USE. 2. EXISTING RECEPTACLE TO REMAIN. 3. EXISTING LIGHT SWITCH TO REMAIN. GENERAL NOTES BUDLONG & ASSOCIATES, INC M E P C O N S U L T I N G E N G I N E E R S Job No. GLENDALE OFFICE 315 ARDEN AVE, STE 23 GLENDALE, CA 91203 TEL: (818)638-8780 CAMARILLO OFFICE 400 W VENTURA BLVD, STE 240 CAMARILLO, CA 93010 TEL: (805)987-4001 DOWNTOWN-LA OFFICE 633W.5TH STREET 26TH FLOOR LOS ANGELES, CA 90071 TEL: (818)638-8780 19-334 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET: - Author Checker Project Number 799 Moorpark Ave. Moorpark, CA 93021 CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION Designer Project Status PLAN CHECK SUBMITTAL 03/17/2020 ELECTRICAL NEW FLOOR PLAN E201 3/8" = 1'-0"1 MOORPARK ADMINISTRATION BLDG. NEW PLAN NORTH0' 4' 8' 16'32' 608 Appendix IV APPENDIX IV PLUMBING PLAN SET 609 PLUMBING GENERAL NOTES PLUMBING SHEET INDEX SYMBOL ABBR.DESCRIPTION PLUMBING LEGENDPLUMBING FIXTURE SCHEDULE FIXTURE NUMBER FIXTURE CW REMARKSTVWHW TYPE PIPE AND FITTING MATERIALS LOCATION SIZE MATERIAL FITTINGS PLUMBING SCOPE OF WORK BUDLONG & ASSOCIATES, INC M E P C O N S U L T I N G E N G I N E E R S Job No. GLENDALE OFFICE 315 ARDEN AVE, STE 23 GLENDALE, CA 91203 TEL: (818)638-8780 CAMARILLO OFFICE 400 W VENTURA BLVD, STE 240 CAMARILLO, CA 93010 TEL: (805)987-4001 DOWNTOWN-LA OFFICE 633W.5TH STREET 26TH FLOOR LOS ANGELES, CA 90071 TEL: (818)638-8780 19-334 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET:- Author Checker Project Number 799 Moorpark Ave. Moorpark, CA 93021 CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION Designer Project Status PLAN CHECK SUBMITTAL 03/17/2020 P101 PLUMBING FRONT SHEET 610 SS LOBBY 101 OPEN OFFICE 104 OPEN OFFICE 105 VESTIBULE 106 VESTIBULE 107 MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 OFFICE 111 LUNCH ROOM 110 JAN 121 OFFICE 112 OFFICE 113 OFFICE 114 OFFICE 115 OFFICE 116 A C D D ES B B E E F G ESESES H I J J DEMOLITION KEY NOTES SHEET NOTES BUDLONG & ASSOCIATES, INC M E P C O N S U L T I N G E N G I N E E R S Job No. GLENDALE OFFICE 315 ARDEN AVE, STE 23 GLENDALE, CA 91203 TEL: (818)638-8780 CAMARILLO OFFICE 400 W VENTURA BLVD, STE 240 CAMARILLO, CA 93010 TEL: (805)987-4001 DOWNTOWN-LA OFFICE 633W.5TH STREET 26TH FLOOR LOS ANGELES, CA 90071 TEL: (818)638-8780 19-334 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET:- Author Checker Project Number 799 Moorpark Ave. Moorpark, CA 93021 CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION Designer Project Status PLAN CHECK SUBMITTAL 03/17/2020 PLUMBING DEMO SANITARY FLOOR PLAN P201 1/4" = 1'-0"1 MOORPARK ADMINISTRATION BLDG. DEMO PLAN N O R T H 0' 4' 8' 16'32' 611 SS LOBBY 101 OPEN OFFICE 104 OPEN OFFICE 105 VESTIBULE 106 VESTIBULE 107 MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 OFFICE 111 LUNCH ROOM 110 JAN 121 OFFICE 112 OFFICE 113 OFFICE 114 OFFICE 115 OFFICE 116 A C B B E G H D F I J DEMOLITION KEY NOTES SHEET NOTES BUDLONG & ASSOCIATES, INC M E P C O N S U L T I N G E N G I N E E R S Job No. GLENDALE OFFICE 315 ARDEN AVE, STE 23 GLENDALE, CA 91203 TEL: (818)638-8780 CAMARILLO OFFICE 400 W VENTURA BLVD, STE 240 CAMARILLO, CA 93010 TEL: (805)987-4001 DOWNTOWN-LA OFFICE 633W.5TH STREET 26TH FLOOR LOS ANGELES, CA 90071 TEL: (818)638-8780 19-334 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET:- Author Checker Project Number 799 Moorpark Ave. Moorpark, CA 93021 CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION Designer Project Status PLAN CHECK SUBMITTAL 03/17/2020 PLUMBING DEMO WATER FLOOR PLAN P202 1/4" = 1'-0"1 MOORPARK ADMINISTRATION BLDG. DEMO PLAN N O R T H 0' 4' 8' 16'32' 612 LOBBY 101 OPEN OFFICE 104 OPEN OFFICE 105 VESTIBULE 106 VESTIBULE 107 MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 LUNCH ROOM 110 OFFICE 111 OFFICE 112 OFFICE 113 OFFICE 114 OFFICE 115 OFFICE 116 JAN 121 1 3 2 2 5 7 8 4 6 9 10 W C - 1 1W C - 2 L - 1 L - 1 U - 1 CONSTRUCTION KEY NOTES SHEET NOTES BUDLONG & ASSOCIATES, INC M E P C O N S U L T I N G E N G I N E E R S Job No. GLENDALE OFFICE 315 ARDEN AVE, STE 23 GLENDALE, CA 91203 TEL: (818)638-8780 CAMARILLO OFFICE 400 W VENTURA BLVD, STE 240 CAMARILLO, CA 93010 TEL: (805)987-4001 DOWNTOWN-LA OFFICE 633W.5TH STREET 26TH FLOOR LOS ANGELES, CA 90071 TEL: (818)638-8780 19-334 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET:- Author Checker Project Number 799 Moorpark Ave. Moorpark, CA 93021 CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION Designer Project Status PLAN CHECK SUBMITTAL 03/17/2020 PLUMBING NEW WATER FLOOR PLAN P301 1/4" = 1'-0"1 MOORPARK ADMINISTRATION BLDG. NEW PLAN N O R T H 0' 4' 8' 16'32' 613 LOBBY 101 OPEN OFFICE 104 OPEN OFFICE 105 VESTIBULE 106 VESTIBULE 107 MEN'S RESTROOM 108 WOMEN'S RESTROOM 109 LUNCH ROOM 110 OFFICE 111 OFFICE 112 OFFICE 113 OFFICE 114 OFFICE 115 OFFICE 116 JAN 121 1 3 4 4 ES 2 2 5 5 6 7 ES 8 9 10 11 12 W C - 1 W C - 2 L - 1 L - 1 U - 1 1 CONSTRUCTION KEY NOTES SHEET NOTES BUDLONG & ASSOCIATES, INC M E P C O N S U L T I N G E N G I N E E R S Job No. GLENDALE OFFICE 315 ARDEN AVE, STE 23 GLENDALE, CA 91203 TEL: (818)638-8780 CAMARILLO OFFICE 400 W VENTURA BLVD, STE 240 CAMARILLO, CA 93010 TEL: (805)987-4001 DOWNTOWN-LA OFFICE 633W.5TH STREET 26TH FLOOR LOS ANGELES, CA 90071 TEL: (818)638-8780 19-334 28328 AGOURA ROAD, SUITE 203 AGOURA HILLS, CA 91301 (805) 530-3938 , (818) 874-0071 DATE: DRAWN:CHECKED: PROJECT NO.: _____ OF _____ PROJECT ARCH: SHEET TITLE: SHEET NUMBER: STAMPS/SEALS CONSULTANT COMMISSIONED ARCHITECT PROJECT TITLE SHEET:- Author Checker Project Number 799 Moorpark Ave. Moorpark, CA 93021 CITY OF MOORPARK – ADMINISTRATION BUILDING ACCESSIBLE RESTROOM RENOVATION Designer Project Status PLAN CHECK SUBMITTAL 03/17/2020 PLUMBING NEW SANITARY FLOOR PLAN P302 1/4" = 1'-0"1 MOORPARK ADMINISTRATION BLDG. NEW PLAN N O R T H 0' 4' 8' 16'32' 614 Appendix V APPENDIX V CITY HOLIDAYS – 2021 Friday, January 1 – New Year’s Day Monday, January 18 – Martin Luther King, Jr. Day Monday, February 15 – Presidents Day Monday, March 29 – Cesar Chavez Day Monday, May 31 – Memorial Day Monday, July 5 – Independence Day Holiday Monday, September 6 – Labor Day Thursday, November 11 – Veterans Day Thursday, November 25 – Thanksgiving Day Friday, November 26 – Extended Thanksgiving Holiday Friday, December 24 – Four Hours – Christmas Eve Monday, December 27 Christmas Day Holiday- observed 615