HomeMy WebLinkAboutAGENDA REPORT 2021 1006 CCSA REG ITEM 09B SUPPLEMENTAL
MOORPARK CITY COUNCIL
SUPPLEMENTAL
AGENDA REPORT
TO: Honorable City Council
FROM: Daniel Kim, City Engineer/Public Works Director
DATE: 10/06/2021 Regular Meeting
SUBJECT: Consider Plans and Specifications (Specification No. MPK 21-03),
Authorization to Advertise for Construction Bids, and Authorization
to Request for Proposals for Construction Management Services for
the Princeton Avenue Improvement Project (C0020)
UPDATED APPENDIX I, CONSTRUCTION PLANS
Staff received updated construction drawings from Stantec Consulting Services, Inc.
The updated drawings include the street lighting improvement plans, minor design
changes to the street improvements, and quality control updates.
Attachment: Updated Appendix I, Construction Plans
Item: 9.B.
SUPPLEMENTAL
1
1
STREET IMPROVEMENT PLANPRINCETON AVENUE WIDENINGCITY OF MOORPARK PUBLIC WORKS DEPARTMENT
TITLE SHEET
PRINCETON AVENUE
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
HSIPL-5436
ATTACHMENT
2
RELOCATION PLAN
PRINCETON AVENUE
STA. 1+00.00 TO STA. 10+00.00
DEMOLITION AND UTILITYPUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
2
3
RELOCATION PLANPRINCETON AVENUESTA. 10+00.00 TO STA. 15+00.00DEMOLITION AND UTILITYPUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6934
RELOCATION PLANPRINCETON AVENUESTA. 15+00.00 TO STA. 25+00.00DEMOLITION AND UTILITYPUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6945
RELOCATION PLANPRINCETON AVENUESTA. 25+00.00 TO STA. 30+00.00DEMOLITION AND UTILITY5PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
696
RELOCATION PLANPRINCETON AVENUESTA. 30+00.00 TO ENDDEMOLITION AND UTILITY6PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
697
7
GRADING DETAILS AND LEGEND
PRINCETON AVENUE
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
8
GRADING SECTIONS
PRINCETON AVENUE 8
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
9
GRADING PLAN
PRINCETON AVENUE
STA. 1+00.00 TO STA. 10+00.00
9
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
10
GRADING PLANPRINCETON AVENUESTA. 10+00.00 TO STA. 15+00.0010PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6911
GRADING PLAN
PRINCETON AVENUE
STA. 15+00.00 TO STA. 25+00.00
11
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
12
GRADING PLAN
PRINCETON AVENUE
STA. 25+00.00 TO STA. 30+00.00
12
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
13
GRADING PLAN
PRINCETON AVENUE
STA. 30+00.00 TO END
13
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
14
TYPICAL STREET SECTIONS & DETAILS
PRINCETON AVENUE 14
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
15
····ACCESS ROAD & DRIVEWAY DETAILSPRINCETON AVENUE15PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6916
DRIVEWAY DETAILSPRINCETON AVENUE16PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6917
···········STREET IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 1+00.00 TO STA. 10+00.00
17
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
18
·························STREET IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 10+00.00 TO STA. 20+00.00
18
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
19
··············STREET IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 20+00.00 TO STA. 30+00.00
19
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
20
STREET IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 30+00.00 TO END
20
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
21
STORM DRAIN DETAILS AND KEY MAPPRINCETON AVENUE21PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6922
STORM DRAIN IMPROVEMENT PLANPRINCETON AVENUELINES A, B, X-1, X-222PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6923
STORM DRAIN IMPROVEMENT PLANPRINCETON AVENUELINE C, LAT C-123PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6924
STORM DRAIN IMPROVEMENT PLANPRINCETON AVENUELINE D, LAT D-1, LAT D-2, LAT D-3, LAT D-424PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6925
WALL NOTESPRINCETON AVENUE”25PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
69REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTIONTYPECONTINUOUSSPECIALINSPECTIONPERIODICSPECIALINSPECTIONREFERENCEDSTANDARDIBCREFERENCEAPPLICABLE TOWORK IN THISPLAN SET1. Inspect reinforcement, includingprestressing tendons, and verifyplacement.-XACI 318: Ch.20,25.2, 25.3,26.5.1-26.5.31908.40X2. Reinforcing bar welding:-- a. Verify weldability ofreinforcement bars other thanASTM A706;-XAWS D1.4 &ACI 318: 26.5.4-b. Inspect single-pass filletwelds, maximum 5/16" and;-X-c. Inspect all other welds.X-3. Inspect anchors cast in concrete.-X ACI 318: 17.8.2 -X4. Inspection of anchors post-installedin hardened concrete members.---a. Adhesive anchors installed inhorizontally or upwardly inclinedorientations to resist sustainedtension loads.X- ACI 318: 17.8.2.4 -Xb. Mechanical anchors andadhesive anchors not defined in4.a.-X ACI 318: 17.8.2 -X5. Verifying use of required design mix.-XACI 318: Ch. 19,26.4.3, 26.4.41904.1, 1904.2,1908.2, 1908.3X6. Prior to concrete placement,fabricate specimens for strength tests,perform slump and air content tests,and determine the temperature of theconcrete.X-ASTM C 172ASTM C 31ACI 318: 26.4.5,26.121908.10X7. Inspect concrete and shotcreteplacement for proper applicationtechniques.X- ACI 318: 26.4.51908.6, 1908.7,1908.8X8. Verify maintenance of specifiedcuring temperature and techniques.-XACI 318:26.4.7-26.4.91908.90X9. Inspect prestressed concrete for:a. Application of prestressingforces.X- ACI 318: 26.9.2.1--b. Grouting of bondedprestressing tendons.X- ACI 318: 26.9.2.310. Inspect erection of precastconcrete members.-X ACI 318: Ch. 26.8 --11. Verify in-situ concrete strength,prior to stressing of tendons inpost-tensioned concrete and prior toremoval of shores and forms frombeams and structural slabs.-X ACI 318: 26.10.2 -X12. Inspect formwork for shape,location and dimensions of theconcrete member being formed.-XACI 318:26.10.1(b)-XEXEMPT FROM SPECIAL INSPECTION:Concrete footings that support walls of buildings <=3 stories, supported on earth and design f'c is <= 2,500 psi, per CBC1705.3.2.3.TMS 402 Table 3.1.2 - LEVEL B QUALITY ASSURANCE OF MASONRY CONSTRUCTION*MINIMUM TESTS(d)Verification of Slump flow and Visual Stability Index (VSI) as delivered to the project site in accordance with Specification Article1.5 B.1.b.3 for self consolidating groutVerification of f 'm and f 'AAC in accordance with Specification Article 1.4 B prior to construction, except where specificallyexempted by this CodeMINIMUM SPECIAL INSPECTION(d)INSPECTION TASKFREQUENCY OF INSPECTION(a)APPLICABLETO WORK INTHIS PLANSETCONTINUOUS PERIODIC1. Verify compliance with the approved submittalsXX2. As masonry construction begins, verify that the following are in compliance:a. Proportions of site-prepared mortarXXb. Construction of mortar jointsXXc. Grade and size of prestressing tendons and anchoragesXd. Location of reinforcement, connectors, and prestressing tendonsand anchorages.XXe. Prestressing techniqueXf. Properties of thin-bed mortar for AAC masonry X(b) X(c)3. Prior to grouting, verify that the following are in compliance:a. Grout spaceXXb. Grade, type, and size of reinforcement and anchor bolts, andprestressing tendons, and anchoragesXXc. Placement of reinforcement, connectors, and prestressing tendonsand anchoragesXXd. Proportions of site-prepared grout and prestressing grout forbonded tendonsXXe. Construction of mortar jointsXX4. Verify during construction:a. Size and location of structural elementsXXb. Type, size, and location of anchors, including other details ofanchorage of masonry to structural members, frames, or otherconstructionXXc. Welding of reinforcementXXd. Preparation, construction and protection of masonry during coldweather (temperature below 40°F) or hot weather (temperatureabove 90°F)XXe. Application and measurement of prestressing forceXf. Placement of grout and prestressing grout for bonded tendons is incomplianceXg. Placement of AAC masonry units and construction of thin-bedmortar joints X(b) X(c)5. Observe preparation of grout specimens, mortar specimens, and/orprismsXX(a)Frequency refers to the frequency of Special Inspection, which may be continuous during the task listed or periodically during the listed task, as defined in thetable.(b) Required for the first 5000 square feet of AAC masonry.(c) Required for the first 5000 square feet of AAC masonry.(d) Special Inspection is not required for Veneer constructed in Risk Category 1, 2 or 3 in accordance with TMS 402 Section3.1.1 - Level A Quality Assurance and C-183 Part 4, Chapter 12-Veneer, other than verifying compliance with theapproved submittals.*The above table is a composite of TMS 402 Table 3.1.2, TMS 602 Table 4, and other sections of Code.REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILSTYPECONTINUOUSSPECIALINSPECTIONPERIODICSPECIALINSPECTIONAPPLICABLE TOWORK IN THISPLAN SET1. Verify materials below shallow foundations areadequate to achieve the design bearing capacity.-XX2. Verify excavations are extended to proper depth andhave reached proper material.-XX3. Perform classification and testing of compacted fillmaterials.-XX4. Verify use of proper materials, densities, and liftthicknesses during placement and compaction ofcompacted fill.X-X5. Prior to placement of compacted fill, inspect subgradeand verify that site has been prepared properly.-XX26
WALL A AND B PLAN AND PROFILEPRINCETON AVENUEROAD STA. 1+56.63 TO STA. 10+00.0026PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6927
WALL H PLAN AND PROFILE
PRINCETON AVENUE
ROAD STA. 5+24.65 TO STA. 8+99.73
27
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
28
28WALL B PLAN AND PROFILEPRINCETON AVENUEROAD STA. 10+00.00 TO STA. 15+48.41PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6929
WALL C PLAN AND PROFILEPRINCETON AVENUEROAD STA. 15+76.80 TO STA. 21+96.1529PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6930
WALL G AND J PLAN AND PROFILEPRINCETON AVENUEROAD STA. 9+25.73 TO STA. 19+26.6930PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6931
WALL D, AND E PLAN AND PROFILEPRINCETON AVENUEROAD STA. 22+25.92 TO STA. 30+00.0031PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6932
WALL E PLAN AND PROFILE
PRINCETON AVENUE
ROAD STA. 30+00.00 TO 33+87.54
32
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
33
WALL DETAILS
PRINCETON AVENUE 33
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
34
WALL DETAILSPRINCETON AVENUE34PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6935
WALL DETAILSPRINCETON AVENUE35PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6936
WALL DETAILS
PRINCETON AVENUE 36
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
37
SIGNING AND STRIPING PLAN
PRINCETON AVENUE
STA. 1+00.00 TO STA. 20+00.00
37
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
38
SIGNING AND STRIPING PLAN
PRINCETON AVENUE
STA. 20+00.00 TO END
38
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
39
39TITLE SHEETKnow what'sbelow.Callbefore you dig.IN PARTNERSHIP WITHPRINCETON AVENUE WIDENINGCITY OF MOORPARK PUBLIC WORKS DEPARTMENTWATER IMPROVEMENT PLANVENTURA COUNTY WATERWORKS DISTRICT NO. 1PUBLIC WORKS DEPARTMENTCITY OF MOORPARKWATER IMPROVEMENT PLANENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
PRINCETON AVENUE69V
E
N
TURA COUNTYWATERWORKS DI
ST
RICTS
40
PUBLIC WORKS DEPARTMENTCITY OF MOORPARKWATER IMPROVEMENT PLANENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
PRINCETON AVENUE69V
E
N
TURA COUNTYWATERWORKS DI
ST
RICTS
40SHEET INDEX, GENERAL NOTES,LIST OF ABBREVIATIONS AND LEGENDV
E
N
TURA COUNTYWATERWORKS DI
ST
RICTS
41
41STA. 2+06 TO STA. 10+25PUBLIC WORKS DEPARTMENTCITY OF MOORPARKWATER IMPROVEMENT PLANENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
PRINCETON AVENUE69V
E
N
TURA COUNTYWATERWORKS DI
ST
RICTS
42
STA. 10+25 TO STA. 20+00PUBLIC WORKS DEPARTMENTCITY OF MOORPARKWATER IMPROVEMENT PLANENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
PRINCETON AVENUE69V
E
N
TURA COUNTYWATERWORKS DI
ST
RICTS
4243
STA. 20+00 TO STA. 29+50PUBLIC WORKS DEPARTMENTCITY OF MOORPARKWATER IMPROVEMENT PLANENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
PRINCETON AVENUE69V
E
N
TURA COUNTYWATERWORKS DI
ST
RICTS
4344
44STA. 29+50 TO STA. 34+30PUBLIC WORKS DEPARTMENTCITY OF MOORPARKWATER IMPROVEMENT PLANENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
PRINCETON AVENUE69V
E
N
TURA COUNTYWATERWORKS DI
ST
RICTS
45
45EROSION CONTROL DETAILS & NOTESPRINCETON AVENUEPUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6946
EROSION CONTROL PLANPRINCETON AVENUESTA. 1+00.00 TO STA. 10+00.0046PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6947
EROSION CONTROL PLANPRINCETON AVENUESTA. 10+00.00 TO STA. 15+00.0047PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6948
EROSION CONTROL PLANPRINCETON AVENUESTA. 15+00.00 TO STA. 20+00.0048PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6949
EROSION CONTROL PLANPRINCETON AVENUESTA. 20+00.00 TO STA. 30+00.0049PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6950
EROSION CONTROL PLANPRINCETON AVENUESTA. 30+00.00 TO END50PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMOO
RP
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
6951
PRINCETON AVENUE 51
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
CLOSED
SHOULDER
TEMPORARY TRAFFIC CONTROL PLAN
CALTRANS ROW
TCP OPTION 1 PHASE 1
52
TEMPORARY TRAFFIC CONTROL PLAN
PRINCETON AVENUE
CALTRANS ROW
52
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
END
ROAD WORK
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
END
ROAD WORK
TCP OPTION 1 PHASE 2
53
PRINCETON AVENUE 53
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
ROAD
WORK
AHEAD
ROAD
AHEAD
ONE LANE
CLOSED
LANE
ROAD
WORK
AHEAD
ROAD
AHEAD
ONE LANE
END
ROAD WORK
END
ROAD WORK
CLOSED
LANE
CLOSED
LANE
CLOSED
LANE
CLOSED
LANE
CLOSED
LANE ROAD
WORK
AHEAD
TEMPORARY TRAFFIC CONTROL PLAN
CALTRANS ROW
TCP OPTION 2
54
PRINCETON AVENUE 54
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
TEMPORARY TRAFFIC CONTROL PLAN
CALTRANS ROW
TCP OPTION 3
END
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
END
DETOUR
DETOUR
DETOUR
DETOUR
55
PRINCETON AVENUE 55
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIFORNIAINCOR
P
ORATED J U L Y 1198369
TEMPORARY TRAFFIC CONTROL PLAN
CALTRANS ROW
TCP OPTION 3
DETOUR
ROAD
CLOSED
ROAD
WORK
AHEAD
ROAD
CLOSED
AHEAD
DETOUR
AHEAD
DETOUR
ROAD CLOSED
THRU TRAFFIC
ROAD
CLOSED
AHEAD
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
TO
DETOUR
ROAD
CLOSED
DETOUR
AHEAD
DETOUR
DETOUR
AHEAD
ROAD
CLOSED
AHEAD
56
IRRIGATION NOTES
1.IF IT IS FOUND DURING INSTALLATION THAT THE SITE VARIES FROM THE DRAWINGS, NOTIFY THE PROJECT MANAGER BEFORE PROCEEDING WITH THE WORK.
2.COORDINATE THE INSTALLATION OF ALL SLEEVING WITH CIVIL ENGINEER'S PLANS, ARCH. FOUNDATION PLANS, STRUCTURAL PLANS AND LANDSCAPE
CONSTRUCTION PLANS.
3.PIPE SLEEVE SHALL ALLOW FOR IRRIGATION PIPING AND RELATED COUPLINGS TO EASILY SLIDE THROUGH SLEEVING. EXTEND NEW SLEEVES 12 INCHES BEYOND
EDGE OF PAVING. ALL IRRIGATION MAINLINE CROSSINGS SHALL BE INSTALLED IN SCHEDULE 40 SLEEVES THAT ARE A MIN. OF 2X THE DIAMETER OF THE PRESSURE
PIPE. PROVIDE LOCATOR WIRE OR TAPE ALONG LENGTH OF SLEEVE. ALSO PROVIDE A SEPARATE IRRIGATION WIRE CONDUIT TAPED TO MAINLINE SLEEVE SIZED TO
EASILY PULL WIRES THAT RUNS PARALLEL TO THE SLEEVE. ALL SLEEVES AND CONDUIT MUST BE PERPENDICULAR TO ROAD.
4.ALL IRRIGATION MAINLINE CROSSOVERS SHALL BE INSTALLED IN SCHEDULE 40 SLEEVES THAT ARE IN A MIN. OF 2X THE DIAMETER OF THE PRESSURE PIPE. PROVIDE
LOCATOR WIRE OR TAPE ALONG LENGTH OF SLEEVE. ALSO PROVIDE A SEPARATE IRRIGATION WIRE CONDUIT TAPED TO MAINLINE SLEEVE SIZED TO EASILY PULL
WIRES THAT RUNS PARALLEL TO THE SLEEVE. ALL SLEEVES AND CONDUIT MUST BE PERPENDICULAR TO ROAD.
5.COORDINATE THE INSTALLATION OF ALL IRRIGATION MATERIALS, INCLUDING PIPE, WITH THE PLANTING PLAN TO AVOID INTERFERING WITH THE PLANTING.
6.CONTRACTOR SHALL TEST PRESSURE PRIOR TO CONSTRUCTION. IF PRESSURE IS LESS THAN 80 PSI, NOTIFY THE PROJECT MANAGER PRIOR TO CONSTRUCTION.
7.IRRIGATION DRAWINGS ARE DIAGRAMMATIC. LOCATE MAIN LINE AS DIRECTED PER PLAN. LOCATE NEW PIPELINES, VALVES AND EQUIPMENT IN PLANTING AREAS
WHEREVER POSSIBLE.
8.PVC SHALL BE LAID WITH CONNECTIONS HORIZONTAL, NOT VERTICAL.
9.SCHEDULE 40 PVC ONLY, NO EXCEPTIONS.
10.FOR WORK WITHIN THE LIMITS OF EXISTING TREES, HAND EXCAVATE WITHIN TREE PROTECTION ZONE. EXISTING ROOTS 2" OR GREATER IN DIAMETER SHALL REMAIN
IN PLACE UNLESS REMOVAL IS APPROVED BY THE PROJECT MANAGER.
11.IRRIGATION CONTROLLER TO BE WEATHER- OR SOIL MOISTURE-BASED CONTROLLER THAT AUTOMATICALLY ADJUST IRRIGATION IN RESPONSE TO CHANGES IN
PLANTS' NEEDS AS WEATHER CONDITIONS CHANGE. WEATHER-BASED CONTROLLERS WITHOUT INTEGRAL RAIN SENSORS OR COMMUNICATION SYSTEMS THAT
ACCOUNT FOR LOCAL RAINFALL SHALL HAVE A SEPARATE WIRED OR WIRELESS RAIN SENSOR WHICH CONNECTS OR COMMUNICATES WITH THE CONTROLLER(S).
SOIL MOISTURE-BASED CONTROLLERS ARE NOT REQUIRED TO HAVE RAIN SENSOR INPUT. (CA GREEN BUILDING STANDARDS CODE 4.304.1 IRRIGATION
CONTROLLERS)
12.MOUNT WIRELESS RAIN SENSOR IN LOCATION NOT BLOCKED FROM RAIN BY BUILDING OVERHANG, TREES, OR OTHER OBSTRUCTIONS.
13.PRESSURE TEST ON ALL MAINLINES 4 HOURS AT 150 PSI. CALL INSPECTOR 24 HOURS PRIOR TO TEST.
14.NO IRRIGATION LINES SHALL BE PLACED UNDER ROOTBALLS OF EXISTING OR PROPOSED PLANTS.
15.PRESSURE REGULATING DEVICES ARE REQUIRED IF WATER PRESSURE IS BELOW OR EXCEEDS THE RECOMMENDED PRESSURE OF THE SPECIFIED IRRIGATION DEVICES
16.CHECK VALVES OR ANTI-DRAIN VALVES ARE REQUIRED ON ALL SPRINKLER HEADS WHERE LOW POINT DRAINAGE COULD OCCUR
17.A DIAGRAM OF THE IRRIGATION PLAN SHOWING HYDROZONES SHALL BE KEPT WITH THE IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES
18.AN IRRIGATION AUDIT REPORT SHALL BE COMPLETED AT THE TIME OF FINAL INSPECTION
19.A CERTIFICATE OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE DESIGNER OF THE LANDSCAPE PLANS, IRRIGATION PLANS, OR THE LICENSED
LANDSCAPE CONTRACTOR FOR THE PROJECT.
20.ALL NEW SLEEVING SHALL BE INSTALLED 36" BELOW GRADE UNDER ROADWAY AND SHALL BE INSTALLED BY DIRECTIONAL BORING UNLESS OTHERWISE NOTED ON
PLANS. THERE SHALL BE NO CUTTING OF PAVEMENT, CURB OR GUTTER IN THESE AREAS.
21.ALL CUTS/TRENCHING IN ASPHALT OR CONCRETE SHALL BE REPAIRED ACCORDING TO SPPWC STANDARD PLANS, LATEST EDITION. FOR CONCRETE USE SPPWC
132-3 AND FOR AC PAVING USE SPPWC 133-3 OR AS REQUIRED BY CITY ENGINEER.
22.THE CONTRACTOR SHALL ALLOW FOR MINOR RELOCATION OF BUBBLER HEADS AT HIGH AND LOW SPOTS AT NO CHARGE TO THE CITY.
23.THE IRRIGATION SYSTEM SHALL BE FULLY OPERATIONAL BY THE BEGINNING OF THE PLANT ESTABLISHMENT PERIOD.
CITY OF MOORPARK
LANDSCAPE INSPECTION REQUIREMENTS
(CITY MAINTAINED AREAS)
SCHEDULE:
THE CITY'S LANDSCAPE REPRESENTATIVE WILL INSPECT FOR INSTALLATION COMPLIANCE WITH THE APPROVED LANDSCAPE PLANS. CONTRACTOR
SHALL NOTIFY THE CITY'S LANDSCAPE REPRESENTATIVE 48 HOURS IN ADVANCE OF EACH OF THE REQUIRED INSPECTION:
1.PRESSURE TEST OF IRRIGATON MAINLINE. TO BE COMPLETED PRIOR TO BACKFILLING TRENCHES.
2.IRRIGATION COVERAGE TESTS. COVERAGE TEST SHALL BE COMPLETED PRIOR TO ANY PLANTING.
3.AFTER TREES AND SHRUBS ARE SPOTTED, BUT PRIOR TO PLANTING.
4.FINAL INSPECTION: AT THE START OF THE ONE-YEAR MAINTENANCE PERIOD. PRELIMINARY CERTIFICATE OF COMPLIANCE MAY BE GRANTED AT
THIS TIME.
5.DOCUMENT SUBMITTAL: AS-BUILT PLANS, BACKFLOW ASSEMBLY CERTIFICATIONS, SOILS ANALYSIS REPORTS, FOUR (4) SETS OF CONTROLLER
KEYS, LAMINATED CONTROLLER CHARTS, PRODUCT DATA AND WARRANTIES. DIGITAL PDF AND AUTOCAD FILE FORMAT OF ALL LANDSCAPE
AND AS-BUILT PLANS. 60 DAYS PRIOR TO THE END OF THE MAINTENANCE PERIOD.
6.FINAL CERTIFICATION OF COMPLIANCE: AT THE END OF THE ONE-YEAR MAINTENANCE PERIOD OR AS SPECIFIED BY THE CITY'S COMMUNITY
DEVELOPMENT DIRECTOR.
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION NOTES & SCHEDULE
LI-0.01
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
56
IRRIGATION SCHEDULE
SYMBOL DESCRIPTION MANUFACTURER MODEL GPM PSI
BUBBLERS SERIES NOZZLE MODEL RADIUS
6 GPH POINT SOURCE
EMITTER Hunter Industries(R)Point Source Emitters HE-60-T-IH-RISER-24-60-CV 0 ft 0.10 20 - 50
SHRUB BUBBLER Rain Bird(R)1400 Series Pressure Compensating
Full-Circle Bubblers 1401 0 ft 0.25 20 - 90
MISCELLANEOUS
FLOW SENSOR RAINBIRD FS150B BRASS TEE FLOW SENSOR W/ FSMLXME SMART MODULE
FLUSH VALVE NA PER DETAIL
PULL BOX NA PER DETAIL
VALVES SERIES MODEL
CONTROL VALVE Buckner Superior 950DWRW 950100DWRW 0 - 320 20 - 200
MASTER VALVE Superior 950DW Series 950200DW 0 - 320 20 - 200
GATE VALVE Nibco Gate Valve T-113 0.25 - 30 10 - 150
BACKFLOW PREVENTER Zurn-Wilkins 975XL2 - 2"
QUICK COUPLER -
RECLAIMED Rainbird 33-DNP
PIPE TYPE NOTES
MAINLINE WESTERN LASCO PVC Schedule 40
LATERAL LINE WESTERN LASCO PVC Schedule 40
SLEEVES WESTERN LASCO PVC Schedule 40
CONTROLLER MODEL ENCLOSURE
CONTROLLER Rain Bird(R)ESPLXD Indoor/Outdoor
POINT OF CONNECTION NOTES
POINT OF CONNECTION NEW 2" WATER METER, PER WATER DISTRICT
**CONTRACTOR TO INSTALL MANUFACTURER LISTED EQUIPMENT OR APPROVED EQUAL
PB
F
POC
CC
APPROVED
CITY OF MOORPARK
THESE PLANS HAVE BEEN REVIEWED AND FOUND TO BE IN COMPLIANCE WITH RELEVANT SECTIONS
OF THE MOORPARK MUNICIPAL CODE. LANDSCAPING AND IRRIGATION SHALL BE INSTALLED ON
THE SUBJECT PROPERTY SUBSTANTIALLY AS SHOWN HEREIN.
APPROVED BY:
COMMUNITY DEVELOPMENT DIRECTOR
57
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION CALCULATIONS
LI-0.02
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
WATER EFFICIENT LANDSCAPE WORKSHEET
PROJECT NAME:Princeton Avenue
PROJECT TYPE:Commercial
PROJECT LOCATION:Moorpark, CA
REFERENCE ETo:51.0
TOTAL IRRIGATED LANDSCAPE AREA:44,317 sf
Maxium Applied Water Allowance (MAWA)
MAWA = (ETo) (0.62) [ (ETAF x LA) + ((1 - ETAF) x SLA) ]
MAWA= Maximum Applied Water Allowance
ETo = Reference Evapotranspiration (inches per year)
0.62 = Conversion factor (to gallons per square foot)
ETAF = Evapotranspiration Adjustment Factor = 0.45 for Non-residential Areas
LA = Landscaped Area including SLA (sq ft)
SLA = Portion of Landsape Area identified as Special Landscape Area - see Definitions (square feet)
Applicant to fill in boxes below:
44,317 Irrigated Landscape Area including Special Landscape Area/SLA (square feet)
0 Portion of Landscape Area identified as Special Landscape Area (square feet)
ETo ETAF AREA (sf)Conversion MAWA
MAWA for Total LA 51.0 x 0.45 x 44,317 x 0.62 630,592
MAWA for SLA*51.0 x 0.55 x 0 x 0.62 0
Total MAWA 630,592 (gallons per year)
Estimated Total Water Use (ETWU)ETAF Calculations
ETWU = (ETo) (0.62) [ (PF x HA) / IE + SLA) ]Regular Landscape Areas
Total ETAF x Area 13,180
ETWU = Estimated Total Water Use Total Area 44,317
ETo = Reference Evapotranspiration (inches per year)Average ETAF 0.30
0.62 = Conversion factor (to gallons per square foot)
PF = Plant Factor from WUCOLS (see Table A)All Landscape Areas
HA = Hydrozone Area (square feet)Total ETAF X Area 13,180
IE = Irrigation Efficiency (see Table B)Total Area 44,317
SLA - Portion of Landsape Area identified as Special Landscape Area - see Definitions (square feet)Sitewide ETAF 0.30
Average ETAF meets requirement for this site type.
ETWU arrived from Hydrozone Table below =416,748 gallons per year ETWU meets MAWA requirement.
HYDROZONE TABLE
hydrozone plant water
use
plant factor
(PF)
irrigation
method
irrigation
efficiency (IE)ETAF (PF/IE)
hydrozone
area (HA)
(sf)
ETAF X
Area
% of
landscape
area
Hydrozone
ETWU
REGULAR LANDSCAPE AREAS
1 -VINES-NORTHWEST mod 0.4 drip/bubblers 0.81 0.49 1,989 982 4%31,056
2 -VINES- SOUTH mod 0.4 drip/bubblers 0.81 0.49 4,557 2,250 10%71,155
3 -GROUNDCOVER low 0.2 drip/bubblers 0.81 0.25 6,665 1,646 15%52,033
4 -GROUNDCOVER- SOUTHWEST low 0.2 drip/bubblers 0.81 0.25 7,383 1,823 17%57,641
5 -GROUNDCOVER- NORTH low 0.2 drip/bubblers 0.81 0.25 5,126 1,266 12%40,023
6 -GROUNDCOVER- SOUTHEAST low 0.2 drip/bubblers 0.81 0.25 12,621 3,116 28%98,538
7 -VINES-NORTHEAST mod 0.4 drip/bubblers 0.81 0.49 2,515 1,242 6%39,277
8 -GROUNDCOVER- NORTHEAST low 0.2 drip/bubblers 0.81 0.25 3,461 855 8%27,025
Regular Landscape Area Subtotal 44,317 13,180 100%416,748
SPECIAL LANDSCAPE AREAS (SLA)
Special Landscape Area Subtotal 0 0 0%0
Total 44,317 13,180 100%416,748
Table A - PF (Plant Factor)Table B - IE (Irrigation Efficiency)
Cool Season Turf*0.8 Overhead Spray 0.75
Warm Season Turf**0.6 Drip/Bubblers 0.81
High Water Using Plants 0.8 can be between 0.7 - 0.9 *Dripline 0.85
Moderate Water Using Plants 0.5 can be between 0.4 - 0.6 *ECO-mat 0.89
Low Water Using Plants 0.2 can be between 0.1 - 0.3
*note: adjustment can be made based on exact type of equipment, see irrigation legendVery Low water Using Plants 0.1 below 0.1
* species include tall fescue, ryegrass, bentgrass and kentucky bluegrass
** species include bermudagrass, zoysiagrass, st. augustinegrass
MONTHLY ETo
ETo:Thousand Oaks, CA
jan.feb.mar.april may june july aug.sept.oct.nov.dec.annual
2.2 2.6 3.4 4.5 5.4 5.9 6.7 6.4 5.4 3.9 2.6 2.0 51.0
PRESSURE LOSS CALCULATION (WORST CASE)
P.O.C. 'A' - POTABLE WATER
STATION:A6 STATIC PRESSURE:86 PSI GPM:15.9
DESCRIPTION PSI
P.O.C.2" WATER METER 0.40
2" REDUCED PRESSURE BACKFLOW 12.00
FITTINGS LOSSES (EST.)0.50
TOTAL 12.90
MAINLINE1 1/2" MASTER VALVE 0.45
1 1/2" FLOW METER 0.45
2" MAINLINE (550 LF)1.50
MAINLINE FITTINGS (@ 10%)0.15
MAINLINE LOSS TOTAL 2.55
LATERAL1" CONTROL VALVE 1.50
LATERAL LINE (1650 LF, SIZES PER PLAN)1.62
LATERAL FITTINGS (@ 23%)0.37
LATERAL LOSS TOTAL 3.49
REQUIREDCOMPONENT LOSS TOTAL (P.O.C.+MAINLINE+LATERAL LINE)18.94
REQUIRED AT HEAD 30.00
COMPONENT LOSSES PLUS HEAD LOSS 48.94
10% SAFTEY FACTOR 4.89
TOTAL PRESSURE REQUIRED 53.84
RESIDUALSTATIC PRESSURE 86.00
PRESSURE LOSS/GAIN FROM ELEVATION CHANGE (+/- 0.433 PSI/FT)-4.33
TOTAL AVAILABLE PRESSURE 81.67
RESIDUAL PRESSURE (TOTAL AVAILAIBLE - TOTAL REQUIRED)27.83
TOTAL PRESSURE ABOVE THE MINIMUM REQUIRED
PRESSURE REGULATOR NEEDED
HYDROZONE LEGEND
HZ#HYDROZONE IRRIGATION TYPE
1 VINES-NORTHWEST BUBBLERS
2 VINES- SOUTH BUBBLERS
3 GROUNDCOVER POINT SOURCE EMITTER
4 GROUNDCOVER- SOUTHWEST POINT SOURCE EMITTER
5 GROUNDCOVER- NORTH POINT SOURCE EMITTER
6 GROUNDCOVER- SOUTHEAST POINT SOURCE EMITTER
7 VINES-NORTHEAST BUBBLERS
8 GROUNDCOVER- NORTHEAST POINT SOURCE EMITTER
LATERAL PIPE SIZING
GPM SIZE
1-8 3/4"
8-12 1"
12-22 1 1/4"
22-30 1 1/2"
30+2"
ANTICIPATED MONTHLY IRRIGATION SCHEDULE
JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC ANNUAL
irr.precip plant daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total daily freq.total total
HZ#
VALVE/flow irr.effcy.area rate (PR)factor runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU runtime per ETWU ETWU
hydrozone (GPM)type (IE)(sq.ft.)(in/hr.)(PF)(min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons (min.)week Gallons Gallons
A1 VINES-NORTHWEST 12.25 BUBBLERS 0.81 1,989 0.59 0.4 13 2 1,340 13 2 1,340 13 2 1,340 15 2 1,583 13 3 2,070 13 4 2,740 13 4 2,740 12 5 3,288 14 5 3,593 13 6 4,080 15 5 3,897 12 5 3,288 2,375
A2 VINES- SOUTH 14.50 BUBBLERS 0.81 4,557 0.31 0.4 12 4 3,069 12 4 3,069 12 4 3,069 14 4 3,628 13 6 4,744 14 7 6,278 14 7 6,278 13 9 7,534 15 9 8,232 15 10 9,348 14 10 8,929 13 9 7,534 5,441
A3 GROUNDCOVER 12.70 POINT SOURCE EMITTER 0.81 6,665 0.18 0.2 14 3 2,245 14 3 2,245 14 3 2,245 12 4 2,653 13 5 3,469 14 6 4,591 14 6 4,591 14 7 5,509 14 8 6,019 14 9 6,836 15 8 6,530 14 7 5,509 3,979
A4 GROUNDCOVER- SOUTHWEST 9.00 POINT SOURCE EMITTER 0.81 7,383 0.12 0.2 13 5 2,486 13 5 2,486 13 5 2,486 13 6 2,939 14 7 3,843 15 9 5,086 15 9 5,086 14 11 6,103 14 12 6,668 15 13 7,572 14 13 7,233 14 11 6,103 4,408
A5 GROUNDCOVER- NORTH 7.60 POINT SOURCE EMITTER 0.81 5,126 0.14 0.2 13 4 1,726 13 4 1,726 13 4 1,726 12 5 2,040 14 6 2,668 13 8 3,531 13 8 3,531 14 9 4,238 14 10 4,630 15 11 5,258 14 11 5,022 14 9 4,238 3,061
A6 GROUNDCOVER- SOUTHEAST 15.90 POINT SOURCE EMITTER 0.81 12,621 0.12 0.2 12 5 4,251 12 5 4,251 12 5 4,251 15 5 5,024 14 7 6,569 14 9 8,695 14 9 8,695 14 11 10,433 14 12 11,399 14 13 12,945 15 12 12,366 14 11 10,433 7,535
A7 VINES-NORTHEAST 15.25 BUBBLERS 0.81 2,515 0.58 0.4 13 2 1,694 13 2 1,694 13 2 1,694 10 3 2,002 13 3 2,618 13 4 3,466 13 4 3,466 13 5 4,159 14 5 4,544 13 6 5,160 15 5 4,929 13 5 4,159 3,004
A8 GROUNDCOVER- NORTHEAST 6.10 POINT SOURCE EMITTER 0.81 3,461 0.17 0.2 15 3 1,166 15 3 1,166 15 3 1,166 13 4 1,378 14 5 1,802 13 7 2,385 13 7 2,385 14 8 2,861 15 8 3,126 15 9 3,550 14 9 3,391 14 8 2,861 2,067
1.8 1.8 1.8 1.7 1.8 1.8 1.8 1.8 1.9 1.9 1.9 1.8 31,869
31,869
57
NOTES:
"I HAVE COMPLIED WITH THE CRITERIA OF THE
ORDINANCE (AB 1881) AND APPLIED THEM
ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN
THE IRRIGATION DESIGN PLAN"
"I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE
WATER EFFICIENT LANDSCAPE ORDINANCE AND
SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION
PACKAGE"
LANDSCAPE ARCHITECT DATE
58
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION PLAN
STA. 1+00.00 TO STA. 10+00.00
LI-1.01
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV
VV
V
V
VV
V
V
VVVVVVVVVVVVVVV
VV(E)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
((
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W
)
(W
)
(W
)
(W
)
(W
)
(W
)
(W
)(W)(W)
(W
)
(W
)
(W
)VVVV
V
V
(W)
+
0+00
+
1+00
+
2+00 +3+00
+4+00
+5+00
+6+00
+++
+
+
+
545
570
555 550
560
57
5 570565EE
E ES
VVV
VVV
SD
C
B
WV
WV
WV
FHUP
GU
Y
ICV
ICV
DI
FD
C
WMWM
GU
Y
ICV
CO
M
M
DI UPGU
Y
GU
Y
ICV
ICV ICV
DI
ICV
ICV
ICV
FH
WV
GU
Y
UP
TM
H
WV
WV
WV
GM
UP
UP
AV
#4578172E#4578173E+
+++++++++++BFPBFPBFPVV VVVVSD
C
B
W
M
W
M
W
M
PRINCE
T
O
N AVENUE
(T)
(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)
(T)(T)(T)(T)(G)(G)(G)(G)(G)(G)(G)(G)
(G)
(G)
(G)
(G)
(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)
(G)(G)(G)(G)(G)(G)(G
)
(G
)
(G
)E(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
E
E
EE E E E E
E E E E E
E
E
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)AWAW AW AW AW AW AW
AW
AW
AW
AW
AW
AW
AWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAW
S
D
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OHSDSDSD545
550
555
560
565
560
565
(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
SD SD
(G
)
545
545
5
8
0
585
GU
YWW
WWWWW)
(W)
(W)
#45
5
7
1
2
2
E
UP
3/4 in3/4 in
3/4 in3/4 in
0 20 40 FTMATCHLINE
-
STA
.
5+25
SEE
BELOW
INSTALL MAINLINE AND LATERAL LINE IN
PLANTING AREA, 6" FROM EDGE OF
HARDSCAPE, TYP.
PROPOSED R.O.W.
PROPO
S
E
D R.O.W.
2" MAINLINE, TYP. VVV
VVVV
VVVVVVVV(E)(E)(E)(W)(W)(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(E)(E)(E)(W)(W)(W)VVV
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
VV+++++++
+5+00
+6+00
+7+00 +
8+00
+
9+00
+
10+00
+
+
+
+
+
+
545
550580570
560
545
5
6
5
VV
VV
V
VV
VV
V
VVVVVVVVVVVVV
VVVVVVVVVVVVVVVVVVVVVVVVVVVVVV
VVV VVVVVVVFH
W
V
G
U
Y
U
P
G
M GMW
M
G
U
Y
U
P
U
P
G
U
Y
UP
H
B
U
P
G
U
Y
U
P
G
U
Y
#
4
5
5
7
1
1
9
E
IR
O
N
PI
P
E
VVGMW
M
W
M
W
M
AVENUE
(OH)(OH)(OH)(OH)(OH)(OH)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)(T)(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(G)
(G)
(G)
(G)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
AW
AW
AW
AW
AW
AW
AW AW
AW
AW
AW
AW
AW
AW
AW(G)(G)(G)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
555
545
(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(G)545
550560
5
4
5550 555
550
5
4
5
555
545
560
SDSD(G)
(G)
(G)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
58
0
WW2'-
0
"
PRINCETON AVENUE
3/4 in3/4 in
1.00 in1.00 in
1.00 in1.00 in
3/4 in3/4 in
3/4 in3/4 in 1 1/4 in1 1/4 in3/4 in3/4 in
3/4 in3/4 in
A1
1.00 in
16.25
HZ1
0 20 40 FTMATCHLINE- STA. 5+25 SEE ABOVEMATCHLINE- STA. 10+00SEE SHEET LI-1.02PROPOSED
R.O.W.
PROP
O
S
E
D
R.O.
W
.
PROP
O
S
E
D
R.O.
W
.
PROPOSED
R.O.W.
INSTALL MAINLINE AND
LATERAL LINE IN
PLANTING AREA, 6"
FROM EDGE OF
HARDSCAPE, TYP.
2" MAINLINE, TYP.
IRRIGATION NOTES
1.SEE SHEET LI-0.01 FOR DETAILED IRRIGATION
SCHEDULES AND NOTES.
2.SEE SHEET LI-0.02 FOR CA MWELO
CALCULATIONS
58
IRRIGATION SCHEDULE (THIS SHEET)
SYMBOL DESCRIPTION
BUBBLERS / DRIP EMITTERS
SHRUB BUBBLER
6 GPH POINT SOURCE EMITTER
VALVES
CONTROL VALVE
MASTER VALVE
GATE VALVE
PIPE
MAINLINE
LATERAL LINE
SLEEVES
POINT OF CONNECTION
POINT OF CONNECTION
BACKFLOW PREVENTER
QUICK COUPLER - RECLAIMED
CONTROLLER
CONTROLLER
MISCELLANEOUS
FLUSH VALVE
PULL BOX
FLOW SENSOR
**SEE SHEET LI-0.01 FOR COMPLETE
IRRIGATION SCHEDULE
PB
F
POC
CC
59
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION PLAN
STA. 10+00.00 TO STA. 15+00.00
LI-1.02
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV
V
V(E)(E)(E)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W(W(W(W(W(W)(W)(W)(W)(W)(W)(E)VV
V
V
V
VVVVVVVVVVVVVVVVVVVVVVVVV
V
+
10+00
+
11+00
+
12+00
+
13+00
+
14+00
+
15+00+++++
(
E
)
(
E
)
(E)
(E)
545
615 610
600595590
585
580
555
560
560 560 VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV
V
V
VVVVV
VVV
VV
UP
WV
WV
FH
WV
WM
GUY
GUY
UP
UP
WM
TMH
PRINCETON AVENUE
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(G)(G)(W)AW
AW
AW
AW
AW
AW AW
AW
AW AW
AW
AW
AW
AW
OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
570575580
585 590595600
56
5
57
0
57
5
58
0
58
5
59
0
575
570
565
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
H)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
545
550
560
UP
545
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
DETA
I
L
E
D
T
O
P
O
- IS
THER
E
R
E
A
L
L
Y
A
PIPE HER
E
?
UP
UP
UP AW5
5
5 560545
560
560 565
E E E
(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)
(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)
3/4 in3/4 in
3/4 in3/4 in1 1/4 in1 1/4 in3/4 in3/4 in3/4 in3/4 in3/4 in3/4 in 3/4 in3/4 in
1 1/4 in1 1/4 inA2
1.00 in
14.50
HZ2
A3
1 1/4 in
12.70
HZ3
0 20 40 FTMATCHLINE- STA. 10+00SEE SHEET LI-1.01MATCHLINE- STA. 15+00SEE SHEET LI-1.03PROPOSED R.O.W.
PROPOSED R.O.W.
PROPOSED R.O.W.
PROPOSED R.O.W.
INSTALL MAINLINE AND LATERAL LINE IN
PLANTING AREA, 6" FROM EDGE OF
HARDSCAPE, TYP.
2" MAINLINE, TYP.
IRRIGATION NOTES
1.SEE SHEET LI-0.01 FOR DETAILED IRRIGATION
SCHEDULES AND NOTES.
2.SEE SHEET LI-0.02 FOR CA MWELO
CALCULATIONS
59
IRRIGATION SCHEDULE (THIS SHEET)
SYMBOL DESCRIPTION
BUBBLERS / DRIP EMITTERS
SHRUB BUBBLER
6 GPH POINT SOURCE EMITTER
VALVES
CONTROL VALVE
MASTER VALVE
GATE VALVE
PIPE
MAINLINE
LATERAL LINE
SLEEVES
POINT OF CONNECTION
POINT OF CONNECTION
BACKFLOW PREVENTER
QUICK COUPLER - RECLAIMED
CONTROLLER
CONTROLLER
MISCELLANEOUS
FLUSH VALVE
PULL BOX
FLOW SENSOR
**SEE SHEET LI-0.01 FOR COMPLETE
IRRIGATION SCHEDULE
PB
F
POC
CC
60
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION PLAN
STA. 15+00.00 TO STA. 20+00.00
LI-1.03
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV++++++VVV
V
V
VVV++++++++++++++++(E)(E)(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(E)VV
V
+15+00
+16+00
+17+00 +
18+00
+
19+00
+
20+00
+
++++
(E)
(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)
(E)
(E)
585
580 570565575595555
560
560565
++++++++++++++++
++VVVVVVVVVVVVVVVVVVWV WV
FH
EMH
WM
ELEC
GM
ELEC
UP WM
WM
GUY
UP
UP
UP
TMH
CAISSON
(OH
)
(OH
)
(OH
)
AW
AW
AW
AW
AW
AW AW AW AW AW AW AW
AW
AWHWY 23(SOUTHBOUND(2)6" OVER
15" CM
P
(OH)(OH)(OH)(OH)(OH)575
570
565 585565570
575
560
555
550
560565
(OH)
5
4
5
545
550
555
550 545560
555(2)8" SDMARKER
HB
UP
UP
HB
GUY
DI
DIDI
+++545 SDSD(OH)(OH)(OH)(OH)(OH)(OH)
DETAILED TOPO
FOR NEW
DRIVEWAY AND
STORMDRAIN
OUTFALL
DETAILED TOPO - IS
THERE REALLY A
PIPE HERE?565545
560
550570575
580
585
590
595600
GUYSDSD 565EE(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)
(G)
(G)(G)(G)(G)(G)(G)SDSDE
E
E
E E E E E E E E E E E E E E E E E E E
E
E
E
(T)(T)(E)(E)12" PEP
4'-3"
2'-3"
4'-2"
3'-11"
PRINCETON AVENUE
3/4 in3/4 in
POC CPB
3/4 in3/4 in
3/4 in3/4 in
F
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in3/4 in3/4 in3/4 in3/4 in
3/4 in3/4 in3/4 in3/4 in3/4 in3/4 in 3/4 in3/4 in
3/4 in3/4 in 3/4 in3/4 in
3/4 in3/4 in1.00 in1.00 inPB
A4
1.00 in
9.00
HZ4
A5
1.00 in
7.60
HZ5
0 20 40 FTMATCHLINE-
STA
.
15+00SEE SHEET
L
I-1
.02MATCHLINE- STA. 20+00SEE SHEET LI-1.04IRRIGATION POINT OF CONNECTION ‘A’ NEW 2" WATERMETER-STATIC PRESSURE 86 PSI (PER VENTURA COUNTY
WATERWORKS NO. 1 ON 09/12/2019, TOM BANDAGSKI(805)378-3023). COORDINATE WITH VENTURA COUNTY
WATERWORKS NO. 1. NEW 2" BACKFLOW PREVENTERAND APPURTENANCES. CONTRACTOR TO CONFIRM
PRIOR TO IRRIGATION INSTALLATION AND REPORTDISCREPANCES TO CITY REPRESENATIVE.
IRRIGATION CONTROLLER PEDESTAL 'A': INSTALL
ENCLOSURE PER IRRIGATION LEGEND. LOCATE PEDESTALAT BACK OF WALK WITHIN CITY R.OW. CONTRACTOR TO
PROVIDE PULL BOX AND CONDUIT FRUN FROM S.C.E.POWER SOURCE TO NEW PEDESTAL. FINAL LOCATION
SHALL BE AS DEFINED BY S.C.E. AND APPROVED IN THEFIELD BY A CITY REPRESENTATIVE.
PROPOS
E
D R.O.W.
PROPOS
E
D R.O.W.CALTRANS R.O.W.PROPOSED R.O.W.CALTRANS R.O.W.CALTRANS R.O.W.INSTALL MAINLINE AND LATERAL LINE IN
PLANTING AREA, 6" FROM EDGE OF
HARDSCAPE, TYP. DIRECTIONAL BORE UNDER ROADWAY
PER NOTE #20, SHEET LI-0.01
2" MAINLINE, TYP.
IRRIGATION NOTES
1.SEE SHEET LI-0.01 FOR DETAILED IRRIGATION
SCHEDULES AND NOTES.
2.SEE SHEET LI-0.02 FOR CA MWELO
CALCULATIONS
60
IRRIGATION SCHEDULE (THIS SHEET)
SYMBOL DESCRIPTION
BUBBLERS / DRIP EMITTERS
SHRUB BUBBLER
6 GPH POINT SOURCE EMITTER
VALVES
CONTROL VALVE
MASTER VALVE
GATE VALVE
PIPE
MAINLINE
LATERAL LINE
SLEEVES
POINT OF CONNECTION
POINT OF CONNECTION
BACKFLOW PREVENTER
QUICK COUPLER - RECLAIMED
CONTROLLER
CONTROLLER
MISCELLANEOUS
FLUSH VALVE
PULL BOX
FLOW SENSOR
**SEE SHEET LI-0.01 FOR COMPLETE
IRRIGATION SCHEDULE
PB
F
POC
CC
61
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION PLAN
STA. 20+00.00 TO STA. 30+00.00
LI-1.04
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV++++++++++++++V
V
V
(E)(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)
(W)(W)(W)(W)(W)(E)(E)V(W)(W)(W)+
25+00
+
26+00
+27+00
+28+00
+29+00
+30+00
+
+
+
+
+
(E)
(E)
(E)
(E)
(E)
(E)
(E)580580
565
570
560
560 575S
OHWVVVVVV
VVVVV+++++++++++++++++
+
EEE
EE
GUY
UP
UP
TMH
WM
WM
WM FH
WV
WVWV SMH
UP GUY WM
UP
UP
UP
RISER
TELE
#679836E
GM NOGALES
AVENUE
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(G)
(G)
(G)
(G)
(G)
(G)(G)(G)(G)
(G)
(G)(G)(G)(G)(G)(G)(G)SSSS
S
S
S
S
S
S
S
(G)(G)(G)(G)(G)(G)(G)AW
A
W
AW
AW
AW AW
AW
AW(G)(G)(OH)(OH)(OH)585
590
595
600
57
5
SDSD
(G)(G)(G)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
E
E
E(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(OH)(OH)(OH)(OH)WM
WM
WM
WV
WVWV
WV
GUY
GUYGUY
GUY
UP
UPFO R
ISER
EDISON
VAULT
U
P 565EE
EE
E
E
E
E
E
E
E E E
E
E
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(G)(G)(G)SDSD57
5570
56
5
575
57
0565 580560
560 575580585590595
600
570
565
580
585590595 580
(W)(W)(W)(W)(W)(W)(W)
(T)
PRINCETO
N
AVENUE
3/4 in3/4 in3/4 in
3/4 in
3/4 in3/4 in
3/4 in3/4 in 3/4
in
3/4
in
3/4 in3/4 in
3/4 in3/4 in
0 20 40 FTMATCHLINE- STA. 25+00SEE ABOVELIMIT OF WORKLANDSCAPE PLANS- STA. 30+00PROP
O
S
E
D
R.O.W
.
PROPOSED
R.O.W.
INSTALL MAINLINE AND LATERAL LINE IN
PLANTING AREA, 6" FROM EDGE OF
HARDSCAPE, TYP.
2" MAINLINE, TYP. VV++++V V
++++++++++++++++++++++++++++++++++++++++++
+++(W)(W)(W)(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W
)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)
(W)(W)(W)(W)V+20+00
+21+00
+22+00
+
23+00
+
24+00
+
25+00
+
+
+
+
+(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)
570
560
560VV
VV
VVVVVVVVVVVVVV
VVVV
V
VVSDSD
TMH
CAISSO
N ++++++++PRINCETON
AVENUE
AW
AW
AW
AW
AW
AW AW
AW
AW
AW
AW
AW
AW
AW AW23THBOUND)42"SD24"SDSDSDSDSDSDSD
SD
SD
36"SD
560565
570
575
SDSD
WM
MARKE
R
DETAIL
E
D T
O
P
O FOR PIPE EXTEN
SI
O
N
UP570560
555555565
SDSDSDSD
SD SD565SDSD(G)
(G)
(G)
(G)(G)(G)(G)(G)
(G)
(G)
(G)
(G)(G)(G)
560
E
E
E
E
E
E
E
E
E
E
E E E E
E
E
E
E
E
EE
EE
E
E
E
E
E E E E
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(G)(G)SDSD(T)(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
565
570
575
570
565560
575
565
3'-0"
2'-1"
3/4 in3/4 in1.00 in1.00 in
1.00 in1.00 in
3/4 in3/4 in
1 1/4 in1 1/4 in3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in 3/4 in3/4 in
3/4 in3/4 in 3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in 3/4 in3/4 in
3/4 in3/4 in
3/4
in3/4
in
3
/
4
i
n
3
/
4
i
n 3/4
in3/4
in
3/4 in3/4 in1.00 in1.00 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in
3/4 in3/4 in3/4 in3/4 in
3/4 in3/4 in
3/4
in3/4
in 3/4 in3/4 in3/4 in3/4 in3/4 in3/4 in3/4 in3/4 in
3/4 in3/4 in3/4 in3/4 in3/4 in3/4 in1 1/4 in1 1/4 inA6
1.00 in
15.90
HZ6
A7
1.00 in
15.25
HZ7 A8
1.00 in
6.10
HZ8
0 20 40 FTMATCHLINE
-
STA
.
20+00SEE SHEET
L
I
-1
.03MATCHLINE- STA. 25+00SEE BELOWPROPOS
E
D
R.O.W.CALTRANSR.O.W.CALTRANSR.O.W.CALTRANS R.O.W.
INSTALL MAINLINE AND
LATERAL LINE IN PLANTING
AREA, 6" FROM EDGE OF
HARDSCAPE, TYP.
2" MAINLINE, TYP.
IRRIGATION NOTES
1.SEE SHEET LI-0.01 FOR DETAILED IRRIGATION
SCHEDULES AND NOTES.
2.SEE SHEET LI-0.02 FOR CA MWELO
CALCULATIONS
61
IRRIGATION SCHEDULE (THIS SHEET)
SYMBOL DESCRIPTION
BUBBLERS / DRIP EMITTERS
SHRUB BUBBLER
6 GPH POINT SOURCE EMITTER
VALVES
CONTROL VALVE
MASTER VALVE
GATE VALVE
PIPE
MAINLINE
LATERAL LINE
SLEEVES
POINT OF CONNECTION
POINT OF CONNECTION
BACKFLOW PREVENTER
QUICK COUPLER - RECLAIMED
CONTROLLER
CONTROLLER
MISCELLANEOUS
FLUSH VALVE
PULL BOX
FLOW SENSOR
**SEE SHEET LI-0.01 FOR COMPLETE
IRRIGATION SCHEDULE
PB
F
POC
CC
62
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION DETAILS
LI-2.01
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
62
FLOW
1
LEGEND:
FINISH GRADE
BARK MULCH
VALVE BOX
PVC MAINLINE
FLOW SENSOR PER LEGEND
PROVIDE BRICK FOR BASE SUPPORT
WIRES FROM FLOW SENSOR TO CONTROLLER PER MANUFACTURES SPECIFICATIONS
6" MIN. PEA GRAVEL DRAIN SUMP
4
2
3
1
NOTES:
1.INSTALL VALVE BOX 1" ABOVE TOP OF MULCH2.WRAP ALL THREADED FITTINGS WITH TEFLON TAPE
2
3
5
4 5
6
7
6
8
7
818" MIN.6"FLOW SENSOR
Scale: 3/4" = 1'-0"D
Resolution 2012-3096
Page 86
6AGl<fI=L.OY'll P~I!VI!NTI!!~ ~I!TAIL. (PL.ATI!! ~-3)
City of Moorpark
Community Development
Department
Backflow
Preventer Deta iI Plate 2-3
BACKFLOW PREVENTER DETAIL
N.T.S.B
Resolution 2012-3096
Page 84
~
7
,
7
TNIe WR5 TO RIS£R
KEY
0~':s~~~~
o WATER ~ ePOXY ~~
0"TAe.
O VIL~ ~ W/(,(JVff.R (11-~~
R&-.V. ~ tMSreR VILVf. IK1 W/V1LVf.
NO.
0"-1J5t1 IN L.AMa / ~,.-IN
0~~VIt.~
7 Pit;. ~ &fJ NflPl.e.
& ~ 0 Of'''~
, ~~Plt;.aL~~
It' Pit;. ~ &fJ t.W.e ~ o Pit;. LA~ fltR F\.JH.
@) MIN. -f PePT'I1 Of' "/~ WA!!ltIS> fJRINa..
® ~~ Plt;./f"L .. ~
R!!MOT!! CONTROl-VAl-V! t)!TAII-(PI-AT!! :2-1)
City of Moorpark
Community Development
Department
Remote Control
Valve Detail Plate 2-1
REMOTE CONTROL VALVE
N.T.S.A
Resolution 2012-3096
Page 87
KEY
TOP a= MJ...t.H
2. FINI£tt ~
~ LONE7~~ ~ o pvc, 5a1 &0 NIPPLE
(l....ENeJTH A5 ~)
® pvc, 5a1 At? ELL® pvc, 5a1 At? STREET ELL
CD pvc, 5a1 At? TEE ~ ELL
® pvc, LATERIL PIPE
eueeL.l!~ DeTAIL. (PL.ATI! ~-4)
d~~~-~ ~.i -~j) _ City of Moorpark Bubbler
I
!£::r; w. Yfl:Z:1. \
I Community Development Plate 2-4fY'~'" ~J Detail ~ ;J! DepartmentQ~ • ~.i~L-_ ~_-)~~...",
BUBBLER DETAIL
N.T.S.C
6"LEGEND:
KINK RESISTANT FLEXIBLE PIPE
FINISH GRADE
VALVE BOX
COMPACTED NATIVE SUBGRADE
PVC LATERAL LINE
PROVIDE BRICK FOR BASE SUPPORT
PVC MANUAL BALL VALVE
THREAD BY BARB ELBOW FITTING
6" MIN. PEA GRAVEL
NOTES:
1.INSTALL VALVE BOX 1" ABOVE FINISH GRADE OR FLUSH IN PAVED AREAS2. WRAP ALL THREADED FITTINGS W/ TEFLON TAPE
3
2
1
6
4
9
7
5
2
3
4
5
7
6
1
9
8
8
FLUSH VALVE
Scale: 1" = 1'-0"E
LEGEND:
FINISH GRADE
VALVE BOX
COMPACTED NATIVE BACKFILL
PROVIDE BRICK FOR BASE SUPPORT
ELECTRICAL CONDUIT WITH SWEEPING ELL
6" MIN. PEA GRAVEL
ADJACENT CONCRETE
DBY-6 DIRECT BURIAL SPLICE KIT
NOTES:
1. INSTALL VALVE BOX 1" ABOVE FINISH GRADE OR FLUSH IN PAVED AREAS2. MAXIMUM WIRE SIZES PER CONNECTOR ARE 3-14'S OR 2-12'S
5
3
2
7
8
6
4
11
2
3
5
6
4
7 8
PULL BOX
Scale: 3/4" = 1'-0"F
LEGEND:
BARK MULCH
FINISH GRADE
WIRE CONNECTORS
ELECTRIC MASTER CONTROL VALVE PER LEGEND
VALVE BOX
PVC MAINLINE
PROVIDE BRICK FOR BASE SUPPORT
6" MIN. PEA GRAVEL
COMMON WIRE EXPANSION CURL
CONTROL WIRE EXPANSION CURL
NOTES:
1.INSTALL VALVE BOX 1" ABOVE TOP OF MULCH OR FLUSH IN PAVED AREAS2. WRAP ALL THREADED FITTINGS W/ TEFLON TAPE18" MIN.6"1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
89
10
MASTER VALVE
Scale: 1" = 1'-0"G
LEGEND:
FINISH GRADE
GATE VALVE PER LEGEND
PVC SCH80 MALE ADAPTER TWO (2) REQUIRED
VALVE BOX
PVC MAINLINE
PROVIDE BRICK FOR BASE SUPPORT
6" MIN. PEA GRAVEL
NOTES:
1. INSTALL VALVE BOX 1" ABOVE FINISH GRADE OR FLUSH IN PAVED AREAS2. WRAP ALL THREADED FITTINGS W/ TEFLON TAPE24" MIN.6"1
3
2
6
4
7
5
1
2
3
5
6
4
7
GATE VALVE
Scale: 1" = 1'-0"H
63
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
IRRIGATION DETAILS
LI-2.02
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
63 24" MIN.1
3
4
5
6
7
8
9
10
2
LEGEND:
FINISH GRADE
QUICK COUPLER VALVE PER LEGEND
VALVE BOX
PROVIDE BRICK BASE FOR SUPPORT
COMPACTED SUBGRADE
PEA GRAVEL
SCH 80 NIPPLE
TWO 90° PVC STREET ELLS
PVC MAINLINE
SCH 80 SxT COUPLING
NOTES:
1. INSTALL VALVE BOX 1" ABOVE FINISH GRADE
OR FLUSH IN PAVED AREAS
2. WRAP ALL THREADED FITTINGS W/ TEFLON
TAPE
F.G.1
2
3
4
5
6
7
8
9
10
QUICK COUPLER
Scale: 1 1/2" = 1'-0"A
LEGEND:
ADJACENT PAVING
BASE MATERIAL
FINISH GRADE
COMPACTED NATIVE BACKFILL
SAND BACKFILL - MINIMUM 2" LAYER SAND BED BENEATH LOWEST PIPE, MINIMUM 6" FILL ABOVE HIGHEST PIPE
LOW VOLTAGE WIRING
IRRIGATION MAINLINE
IRRIGATION LATERAL LINE
SCH. 40 PVC SLEEVING FOR IRRIGATION MAINLINE AND LATERAL (ALL PIPES SLIDE EASILY W/ EXTRA SPACE)
ELECTRICAL CONDUIT FOR WIRES (ALLOW EXTRA ROOM FOR WIRE MOVEMENT)
NATIVE SUBGRADE
NOTES:
1. EXTEND ALL SLEEVING UNDERNEATH PAVING 12" MINIMUM INTO PLANTERS2. MAINLINE TRENCHING UNDERNEATH TREE DRIP LINES SHALL INCLUDE ROOT PRUNING. NO ROOT OVER 2" DIAMETER SHALL BE CUT WITHOUT APPROVAL BY THE CITY ARBORIST.
SECTION UNDER PAVING SECTION IN PLANTER24" MIN.18" MIN.6"6"6"24" MIN.10
11
11
10
11
1
4
6
3
8
9
7
2
2
3
1
4
5
9
6
7
8 5
4
5
TRENCHING
Scale: 3/4" = 1'-0"B
SS TOP ENTRY CONTROLLER ENCLOSURE
N.T.S.C
EXISTING SLOPE.
SxSxT TEE OR ELL.
LATERAL ON GRADE SHALL BE UVR PIPE (SET
ABOVE BASIN)
TWO 90° PVC STREET ELLS.
RISER PER IRRIGATION SCHEDULE
POINT SOURCE EMITTERS - 1/2" THREADED
CONNECTION.
#3 REBAR J-HOOK 10' O.C.
MAX. 1:1 CUT SLOPE @ BACK OF SHRUB.
BASIN FINISH GRADE.
4" HIGH WATERING BASIN.
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
10
9
10
LEGEND:
NOTE:
1.REFER TO IRRIGATION SCHEDULE
FOR MATERIAL MODELS AND
MANUFACTURERS.
2.STAKE RISERS WITH 6", 9 GAUGE
GALVANIZED TIE DOWN STAKES
POINT SOURCE DRIP EMITTER ON SLOPE'
Scale: 3/4" = 1'-0"E
1
LEGEND:
2
3
4
52
4
5
6
PLACE EMITTER 9" MAX FROM PLANT
STEM. SEE ENLARGEMENT
DIFFUSER BUG CAP
UNIVERSAL 1/4" TUBING STAKE
1/4" DISTRIBUTION TUBING
TOP OF MULCH
PRESSURE-COMPENSATING MODULE
BARB INLET X BARB OUTLET EMITTER
17MM TUBING PER IRRIGATION LEGEND
FINISH GRADE
F.G.
9" MIN.
SECTION
ENLARGEMENT
1
3
8
6
7
7
8
POINT SOURCE DRIP EMITTER
Scale: 1 1/2" = 1'-0"D
64
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
PLANTING NOTES & SCHEDULE
LP-0.01
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
PLANTING NOTES
1.ALL PLANTED AREAS SHALL BE THOROUGHLY RIPPED TO A DEPTH OF 8", USING RIPPER WITH TEETH NO WIDER THAN 12" O.C. WHERE
POSSIBLE. THE RIPPING SHOULD BE DONE IN TWO DIRECTIONS TO REDUCE THE COMPACTION WHICH OCCURS AS A RESULT OF
CONSTRUCTION.
2.THE CONTRACTOR SHALL COLLECT A MINIMUM OF EIGHT SOIL SAMPLES FROM NEW PLANTING AREAS FOR AGRONOMIC TESTING &
AMENDMENT RECOMMENDATIONS FROM FRUIT GROWERS LAB @ (805) 392-2000. RESULTS SHALL BE TRANSMITTED TO CLIENT AND
LANDSCAPE ARCHITECT OF RECORD. SOIL MANAGEMENT REPORT RECOMMENDATIONS SHALL ADDRESS THE FOLLOWING AT A
MINIMUM: SOIL TEXTURE, SOIL INFILTRATION RATE, SOIL PH, AND SUGGESTED AMENDMENTS BASED UPON PROPOSED PLANTING PALETTE.
SEE SPECIFICATIONS.
3.FOR SOILS LESS THAN 6% ORGANIC MATTER IN THE TOP 6 INCHES OF SOIL, COMPOST AT A RATE OF A MINIMUM OF FOUR CUBIC YARDS
PER 1,000 SQUARE FEET OR PERMEABLE AREA SHALL BE INCORPORATED TO A DEPTH OF SIX INCHES INTO THE SOIL
4.ALL AMENDMENTS TO BE APPLIED PER SOIL MANAGEMENT REPORT, OR IF NO TECHNIQUE IS SPECIFIED, THEN MIXED TOGETHER AND
ROTOTILLED INTO PLANTING AREAS TO A DEPTH OF 6". (UNTIL RESULTS OF SOIL MANAGEMENT REPORT ARE OBTAINED, THE FOLLOWING
AMENDMENTS MAY BE USED FOR BID PURPOSES ONLY. RESULTS OF SOILS ANALYSIS SUPERSEDE THESE QUANTITIES):
5 LBS/1000 SF POTASSIUM SULFATE
5 LBS/1000 SF AMMONIUM SULFATE
5 LBS/1000 SF SINGLE SUPERPHOSPHATE OR EQ.
80 LBS/1000 SF AGRICULTURAL GYPSUM
6 CY GENERAL PURPOSE SOIL AMENDMENT
5.BACKFILL PER CY FOR CONTAINER PLANTS (BACKFILL MIX PROVIDED FOR BID PURPOSES ONLY. RESULTS OF SOILS ANALYSIS SUPERSEDE
THESE QUANTITIES):
1/4 LB POTASSIUM SULPHATE
1/4 LB AMMONIUM SULPHATE
1/5 LB SINGLE SUPERPHOSPHATE OR EQ.
4 LBS AGRICULTURAL GYPSUM
5 PARTS BY VOLUME NATIVE SOIL
1 PART BY VOLUME AQUINAGA TURF PLUS
6.GRO-POWER PLANTING TABLETS PLACED 2 INCHES DEEP AND 2" OUTSIDE ROOT BALL: (3) PER 1 GAL; (9) PER 5 GAL; (15) PER 15 GAL,
(24) PER 24" BOX AND (24) PER 36" BOX
7.ALL TREES WITHIN 5 FT. OF PAVEMENT TO HAVE CENTURY PRODUCTS LINEAR CP36-2 'POLYETHYLENE' ROOT BARRIERS INSTALLED PER
MANUFACTURER'S RECOMMENDATIONS 1 1/2" OFF BACK OF CURB OR EDGE OF PAVEMENT. ROOT BARRIER TO BE INSTALLED AT BACK
OF HARDSCAPE, IN 10 FOOT PANELS CENTERED ON THE TREE TRUNK, (NOT IN CIRCLE AROUND ROOT BALL).
8.PLANT MATERIAL QUANTITIES LISTED FOR CONVENIENCE OF CONTRACTOR. ACTUAL NUMBER OF SYMBOLS SHALL HAVE PRIORITY OVER
QUANTITY DESIGNATED.
9.A MINIMUM 3-INCH LAYER OF MULCH SHALL BE APPLIED ON ALL EXPOSED SOIL SURFACES OF PLANTING AREAS EXCEPT TURF AREAS,
CREEPING OR ROOTING GROUNDCOVERS, OR DIRECT SEEDING APPLICATIONS WHERE MULCH IS CONTRADICTORY.
10.MULCH SHALL BE ES-2 MULCH FROM AGROMIN PREMIUM SOIL PRODUCTS (805) 482.8749. PROVIDE SAMPLE TO LANDSCAPE ARCHITECT
OF RECORD FOR APPROVAL.
11.SLOPES GREATER THAN A 3:1 INCLINE REQUIRE A SMOLDER RESISTANT JUTE NETTING WITH 4" OVERLAP AND SHALL BE PINNED AT 4' O.C.
ALONG OVERLAP.
12.SEE SHEET, LP-2.01 FOR ALL PLANTING DETAILS
64
PLANT SCHEDULE - VINES/GROUNDCOVER
SYMBOL QTY LATIN NAME COMMON NAME WUCOLS SIZE
VINES
73 Distictis buccinatoria Scarlet Trumpet Vine M 5 gal
111 Parthenocissus tricuspidata
'Veitchii'Boston Ivy M 5 gal
GROUNDCOVER
440 Baccharis pilularis 'Pigeon
Point'Dwarf Coyote Bush L 5 gal
180 Ceanothus griseus horizontalis
'Yankee Point'Yankee Point California Lilac L 5 gal
65
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
PLANTING PLAN
STA. 1+00.00 TO STA. 10+00.00
LP-1.01
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV
VV
V
V
VV
V
V
VVVVVVVVVVVVVVV
VV(E)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
((
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W
)
(W
)
(W
)
(W
)
(W
)
(W
)
(W
)(W)(W)
(W
)
(W
)
(W
)VVVV
V
V
(W)
+
0+00
+
1+00
+
2+00 +3+00
+4+00
+5+00
+6+00
+++
+
+
+
545
570
555 550
560
57
5 570565EE
E ES
VVV
VVV
SD
C
B
WV
WV
WV
FHUP
GU
Y
ICV
ICV
DI
FD
C
WMWM
GU
Y
ICV
CO
M
M
DI UPGU
Y
GU
Y
ICV
ICV ICV
DI
ICV
ICV
ICV
FH
WV
GU
Y
UP
TM
H
WV
WV
WV
GM
UP
UP
AV
#4578172E#4578173E+
+++++++++++BFPBFPBFPVV VVVVSD
C
B
W
M
W
M
W
M
PRINCE
T
O
N AVENUE
(T)
(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)
(T)(T)(T)(T)(G)(G)(G)(G)(G)(G)(G)(G)
(G)
(G)
(G)
(G)
(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)
(G)(G)(G)(G)(G)(G)(G
)
(G
)
(G
)E(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
E
E
EE E E E E
E E E E E
E
E
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)AWAW AW AW AW AW AW
AW
AW
AW
AW
AW
AW
AWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAW
S
D
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OHSDSDSD545
550
555
560
565
560
565
(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
SD SD
(G
)
545
545
5
8
0
585
GU
YWW
WWWWW)
(W)
(W)
#45
5
7
1
2
2
E
UP
0 20 40 FTMATCHLINE
-
STA
.
5+25
SEE
BELOWPROPOSED R.O.W.
PROPO
S
E
D R.O.W.VVV
VVVV
VVVVVVVV(E)(E)(E)(W)(W)(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(E)(E)(E)(W)(W)(W)VVV
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
VV+++++++
+5+00
+6+00
+7+00 +
8+00
+
9+00
+
10+00
+
+
+
+
+
+
545
550580570
560
545
5
6
5
VV
VV
V
VV
VV
V
VVVVVVVVVVVVV
VVVVVVVVVVVVVVVVVVVVVVVVVVVVVV
VVV VVVVVVVFH
W
V
G
U
Y
U
P
G
M GMW
M
G
U
Y
U
P
U
P
G
U
Y
UP
H
B
U
P
G
U
Y
U
P
G
U
Y
#
4
5
5
7
1
1
9
E
IR
O
N
PI
P
E
VVGMW
M
W
M
W
M
AVENUE
(OH)(OH)(OH)(OH)(OH)(OH)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)(T)(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(G)
(G)
(G)
(G)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
AW
AW
AW
AW
AW
AW
AW AW
AW
AW
AW
AW
AW
AW
AW(G)(G)(G)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
555
545
(OH)(OH)(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(G)545
550560
5
4
5550 555
550
5
4
5
555
545
560
SDSD(G)
(G)
(G)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
58
0
WW2'-
0
"
PRINCETON AVENUE
0 20 40 FTMATCHLINE- STA. 5+25 SEE ABOVEMATCHLINE- STA. 10+00SEE SHEET LP-1.02PROPOSED
R.O.W.
PROP
O
S
E
D
R.O.
W
.
PROP
O
S
E
D
R.O.
W
.
PROPOSED
R.O.W.
PLANTING NOTES
1.SEE SHEET LP-0.01 FOR DETAILED PLANTING
SCHEDULES AND NOTES.
65
66
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
PLANTING PLAN
STA. 10+00.00 TO STA. 15+00.00
LP-1.02
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV
V
V(E)(E)(E)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)
(W(W(W(W(W(W)(W)(W)(W)(W)(W)(E)VV
V
V
V
VVVVVVVVVVVVVVVVVVVVVVVVV
V
+
10+00
+
11+00
+
12+00
+
13+00
+
14+00
+
15+00+++++
(
E
)
(
E
)
(E)
(E)
545
615 610
600595590
585
580
555
560
560 560 VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV
V
V
VVVVV
VVV
VV
UP
WV
WV
FH
WV
WM
GUY
GUY
UP
UP
WM
TMH
PRINCETON AVENUE
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(G)(G)(W)AW
AW
AW
AW
AW
AW AW
AW
AW AW
AW
AW
AW
AW
OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
570575580
585 590595600
56
5
57
0
57
5
58
0
58
5
59
0
575
570
565
(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
H)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)(OH)
545
550
560
UP
545
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
DETA
I
L
E
D
T
O
P
O
- IS
THER
E
R
E
A
L
L
Y
A
PIPE HER
E
?
UP
UP
UP AW5
5
5 560545
560
560 565
E E E
(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)
(T)(T)(T)(T)(T)(T)(T)(T)(T)(T)
0 20 40 FTMATCHLINE- STA. 10+00SEE SHEET LP-1.01MATCHLINE- STA. 15+00SEE SHEET LP-1.03PROPOSED R.O.W.
PROPOSED R.O.W.
PROPOSED R.O.W.
PROPOSED R.O.W.
PLANTING NOTES
1.SEE SHEET LP-0.01 FOR DETAILED PLANTING
SCHEDULES AND NOTES.
66
67
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
PLANTING PLAN
STA. 15+00.00 TO STA. 20+00.00
LP-1.03
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV++++++VVV
V
V
VVV++++++++++++++++(E)(E)(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)(E)VV
V
+15+00
+16+00
+17+00 +
18+00
+
19+00
+
20+00
+
++++
(E)
(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)
(E)
(E)
585
580 570565575595555
560
560565
++++++++++++++++
++VVVVVVVVVVVVVVVVVVWV WV
FH
EMH
WM
ELEC
GM
ELEC
UP WM
WM
GUY
UP
UP
UP
TMH
CAISSON
(OH
)
(OH
)
(OH
)
AW
AW
AW
AW
AW
AW AW AW AW AW AW AW
AW
AWHWY 23(SOUTHBOUND(2)6" OVER
15" CM
P
(OH)(OH)(OH)(OH)(OH)575
570
565 585565570
575
560
555
550
560565
(OH)
5
4
5
545
550
555
550 545560
555(2)8" SDMARKER
HB
UP
UP
HB
GUY
DI
DIDI
+++545 SDSD(OH)(OH)(OH)(OH)(OH)(OH)
DETAILED TOPO
FOR NEW
DRIVEWAY AND
STORMDRAIN
OUTFALL
DETAILED TOPO - IS
THERE REALLY A
PIPE HERE?565545
560
550570575
580
585
590
595600
GUYSDSD 565EE(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)
(G)
(G)(G)(G)(G)(G)(G)SDSDE
E
E
E E E E E E E E E E E E E E E E E E E
E
E
E
(T)(T)(E)(E)12" PEP
4'-3"
2'-3"
4'-2"
3'-11"
PRINCETON AVENUE
0 20 40 FTMATCHLINE-
STA
.
15+00SEE SHEET
LP-1
.02MATCHLINE- STA. 20+00SEE SHEET LP-1.04PROPOS
E
D R.O.W.
PROPOS
E
D R.O.W.CALTRANS R.O.W.PROPOSED R.O.W.CALTRANS R.O.W.CALTRANS R.O.W.PLANTING NOTES
1.SEE SHEET LP-0.01 FOR DETAILED PLANTING
SCHEDULES AND NOTES.
67
68
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
PLANTING PLAN
STA. 20+00.00 TO STA. 30+00.00
LP-1.04
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
VV++++++++++++++V
V
V
(E)(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W)
(W)(W)(W)(W)(W)(E)(E)V(W)(W)(W)+
25+00
+
26+00
+27+00
+28+00
+29+00
+30+00
+
+
+
+
+
(E)
(E)
(E)
(E)
(E)
(E)
(E)580580
565
570
560
560 575S
OHWVVVVVV
VVVVV+++++++++++++++++
+
EEE
EE
GUY
UP
UP
TMH
WM
WM
WM FH
WV
WVWV SMH
UP GUY WM
UP
UP
UP
RISER
TELE
#679836E
GM NOGALES
AVENUE
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(G)
(G)
(G)
(G)
(G)
(G)(G)(G)(G)
(G)
(G)(G)(G)(G)(G)(G)(G)SSSS
S
S
S
S
S
S
S
(G)(G)(G)(G)(G)(G)(G)AW
A
W
AW
AW
AW AW
AW
AW(G)(G)(OH)(OH)(OH)585
590
595
600
57
5
SDSD
(G)(G)(G)(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
(OH)
E
E
E(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(OH)(OH)(OH)(OH)WM
WM
WM
WV
WVWV
WV
GUY
GUYGUY
GUY
UP
UPFO R
ISER
EDISON
VAULT
U
P 565EE
EE
E
E
E
E
E
E
E E E
E
E
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(G)(G)(G)SDSD57
5570
56
5
575
57
0565 580560
560 575580585590595
600
570
565
580
585590595 580
(W)(W)(W)(W)(W)(W)(W)
(T)
PRINCETO
N
AVENUE
0 20 40 FTMATCHLINE- STA. 25+00SEE ABOVELIMIT OF WORKLANDSCAPE PLANS- STA. 30+00PROP
O
S
E
D
R.O.W
.
PROPOSED
R.O.W.VV++++V V
++++++++++++++++++++++++++++++++++++++++++
+++(W)(W)(W)(W)
(W)
(W)
(W)
(W)(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W
)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)
(W)(W)(W)(W)V+20+00
+21+00
+22+00
+
23+00
+
24+00
+
25+00
+
+
+
+
+(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)
570
560
560VV
VV
VVVVVVVVVVVVVV
VVVV
V
VVSDSD
TMH
CAISSO
N ++++++++PRINCETON
AVENUE
AW
AW
AW
AW
AW
AW AW
AW
AW
AW
AW
AW
AW
AW AW23THBOUND)42"SD24"SDSDSDSDSDSDSD
SD
SD
36"SD
560565
570
575
SDSD
WM
MARKE
R
DETAIL
E
D T
O
P
O FOR PIPE EXTEN
SI
O
N
UP570560
555555565
SDSDSDSD
SD SD565SDSD(G)
(G)
(G)
(G)(G)(G)(G)(G)
(G)
(G)
(G)
(G)(G)(G)
560
E
E
E
E
E
E
E
E
E
E
E E E E
E
E
E
E
E
EE
EE
E
E
E
E
E E E E
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)
(G)(G)(G)SDSD(T)(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
(T)
565
570
575
570
565560
575
565
3'-0"
2'-1"
0 20 40 FTMATCHLINE
-
STA
.
20+00SEE SHEET
LP
-1
.03MATCHLINE- STA. 25+00SEE BELOWPROPOS
E
D
R.O.W.CALTRANSR.O.W.CALTRANSR.O.W.CALTRANS R.O.W.
PLANTING NOTES
1.SEE SHEET LP-0.01 FOR DETAILED PLANTING
SCHEDULES AND NOTES.
68
69
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
DRAWING NO.
SHEET
OF
SPEC. NO.
ENGINEERING
PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:ENGINEERING DIVISIONDESCRIPTIONAPP'DMARKR.C.E.DATE MOORPA R K CALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 11983ENGINEERING REVIEWED BY:
DATE
69
MZ
BM
CITY ENGINEER/PUBLIC WORKS DIRECTOR
SEAN CORRIGAN PE 39479
EXPIRATION DATE 12-31-2019
PRINCETON AVENUE
PLANTING DETAILS
LP-2.01
461 E. Main Street
Ventura, Ca 93001
805.644.9697 www.pc-ld.comMICHAEL Z IELS
D
ORF#6044 T
EAR
C
H
Renewal Date
Date
D
SignatureECILLANNSED CS APCE
T10/31/21
I
MIN.OVERLAP
6"NOTES:
1.OVERLAP JUTE NETTING 3' MINIMUM AT THE TOP AND BOTTOMOF ROLLS. OVERLAP 4" MINIMUM ALONG EDGES OF ROLLS. 2.12" MAX. SPACING OF STAPLES ALONG SLOPE CONTOUR ATTOP AND BOTTOM OF SLOPE AND AT OVERLAPPED ROLL ENDS;5' MAX SPACING DOWNSLOPE.3.EXTEND NETTING TO EDGES OF MANUFACTURED SLOPES
6"
LEGEND:
METAL STAPLES, 6" MIN. LENGTH
JUTE NETTING, SMOLDER RESISTANT, UNIFORM, OPEN, PLAIN WEAVE, UNDYED AND UNBLEACHED SINGLE JUTE YARN, 1.2 LBS/LINEAR YARD, FURNISHED IN 48" WIDTH ROLLS.
ADJACENT FINISH GRADE
BACKFILL W/ SITE SOILAND COMPACT 6" X 6" TRENCH AT TOP OF SLOPE; SECURE NETTING AT BOTTOM OF TRENCH W/ ROW OF STAPLES; OVERLAP JUTE 6" MIN OVER TOP OF TRENCH AND SECURE W/ ROW OF STAPLES
BACKFILL W/ SITE SOIL AND COMPACT 6" X 6" TRENCH AT BOTTOM OF SLOPE; STAPLE NETTING AT BOTTOM OF TRENCH
TOP OFSLOPE
BOTTOMOF SLOPE
1
2
3
4
5
1
2 3
4
5
JUTE NETTING
Scale: 3/8" = 1'-0"C
1
LEGEND:
GROUNDCOVER TO BE
PLANTED IN FLATS, CUTTINGS,
LINERS OR 1 GALLON
CONTAINERS PER PLANS.
SOIL PREPARATION- REFER TO
PLANTING NOTES
2
NOTES:
1.REFER TO PLANTING NOTES FOR
ADDITIONAL SPECIFICATIONS
1
2
XX X
X
SQUARE SPACING TRIANGULAR SPACING
X
X SQ. FT. PLANTS WILL COVER
64 PLANTS 100 PLANTS
4"7 S.F.11 S.F.
6"16 S.F.25 S.F.
8"28 S.F.44 S.F.
10"45 S.F.70 S.F.
1'0"64 S.F.100 S.F.
1'3"100 S.F.156 S.F.
1'6"144 S.F.225 S.F.
2'0"256 S.F.400 S.F.
GROUNDCOVER PLANTING
Scale: 1/2" = 1'-0"A
Resolution 2012-3096
Page 83
o
KEY
CD PERMAl-.ENf ~N.
® EXI5r1f'.e €i.OPE
® r>Aa<FLL (PER '5OL5 REPtRr) o ~ROOf~
® AElRIFORM fll..,6Nf TAtJ5 OR ~.
(I PER H'IL. 2. PER ~IL.
4 PER 15--61L. II PER WJ( U)NTA1N:R)
et-+~UB ON eL..ope PL.AN"I"INCS DeTAIL.. (pL.ATe 1-e)
City of Moorpark
Community Development
Department
Shrub Planting
on Slope Detail Plate 1-5
SHRUB PLANTING ON SLOPE
N.T.S.B
69
70
++++C
C CC C C
C CCCCC
C
G
G
G
S
W
W
W
W WWG G
G
G
G
GG GGWWWG GCC
E E
E
E
C
G
C
CC
C
W1
LIGHTING IMPROVEMENT PLANPRINCETON AVENUE STREETCITY OF MOORPARK PUBLIC WORKS DEPARTMENT
PRINCETON AVENUESR 118MINORFLINN AVE.ST.ZACHARYST.LOS AN
G
E
L
E
S
A
V
E.(HWY.
1
1
8)HWY 23
ST.HEDYLANDHIGH
BONNIE VIEW
MAGNOLIASIRLUCI
L
L
E
GEORGECT.FITCH
CH
SPRING RD.SPRINGST.
ST.RD.AVE.
ARLES
CT.CT.
ST.
WA
R
R
E
N
CI
R
.
PRINC
E
T
O
N
U.P.R.R.
COLONIA
NOGALESAVE.AVENIDA
U.P.R.R.
AVENUE
1SR 118COND
O
R
VIRGINIA
COLONY
PARK
CONDOR
PRINCETON AVENUE
MOORPARK AVE (HWY 23)TITLE SHEET
PRINCETON AVENUE
AW
++V V V V
E
G
544.8
W
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 119838
1CI:##"
##'
SL##
1CI:##"
##'HH##
CI:#"
##'
2
1 #"
#'
PED#
#
STREET LIGHT IMPROVEMENT PLANC XXXXX
* REGISTERED P R O F E S SIONA
L
E
NGI
NEER *S
T
ATE OF C A L IF O R NIAENGIN E E R'S N
A
MECI V I L
71
POLE DETAILS PRINCETON AVENUE2PUBLIC WORKS DEPARTMENTCITY OF MOORPARKENGINEERING DIVISIONMO
O
R
P
ARKCALIFORNIAINCORPORATEDJUL
Y
1
1983
8FROM ELECTRICAL SERVICEHANDHOLE COVERFUSED CONNECTIONGROUNDLINELOADNOTES1. FUSE HOLDER: HEB-120V/HEB-240V WITH FNQ FUSE, BUSSMAN MFG. DIVISION OR APPROVED EQUAL.2. APPLY 3 LAYERS OF NO. 23 ELECTRIC TAPE (3-M CO.) AND 3 LAYERS OF NO. 88 TAPE OR EQUAL (TYPICALLY 2-PLY) SEAL WITH AN APPROVED SEALINGCOMPOUND TO PROVIDE A WATERTIGHT SPLICE.3. NO.6 PULL BOX. COVER TO BE INSCRIBED "STREET LIGHTING".4. FEED CONDUIT FROM CITY SERVICE PEDESTAL (DRAWING B) OR SERVICE LINE PULL BOX. CONDUIT IS TO BE A MIN. 1" RIGID METAL GALVANIZED OR SCHEDULE40 P.V.C..5. MIN. 1" RIGID GALVANIZED OR SCHEDULE 40 P.V.C. CONDUIT (TAPE BOTH ENDS TO PREVENT DEBRIS FROM ENTERING THE CONDUIT).6. 4 ANCHOR BOLTS, HOT DIPPED GALVANIZED, 1"X36"X4".7. UTILITY COMPANIES SHALL NOT INSTALL FACILITIES WITHIN THIS AREA.8. PRE-STRESSED CONCRETE STANDARD (DRAWING A) MOUNTED ON CENTER OF FOUNDATION.9. BOLTS TO PROJECT 4.5" ABOVE FOUNDATION.10. 5" CONCRETE CAP, SLOPED AT .25" PER FOOT TO TOP OF CURB.11. P.C.C. 560-C-3250, PER SECTION 201 OF STD. SPEC. FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION. FOUNDATION DIMENSIONS ARE AS FOLLOW: 30"X30"X48".12. FOUNDATION SHALL BE INSTALLED IN CONJUNCTION WITH CONDUIT (FOR UNDERGROUND SERVICE), CURBS & SIDEWALKS.13. CONCRETE TO REACH A MINIMUM COMPRESSION STRENGTH OF 2800 PSI IN 28 DAYS.1" (MIN) CONDUITTO STREET LIGHTSGROUND RODPADMOUNT BASE(NOTE 1)PEDESTALPEDESTALFRONTSIDEWALKCURBINSTALLATION DETAILSNOTE 8NOTES1. SERVICE PEDESTAL SHALL BE INSTALLED WITH A PADMOUNT BASE.2. CIRCUIT BREAKERS SHALL BE SUITABLE FOR USE ON 120/240-VOLT SERVICEAND SHALL BE APPROVED BY UNDERWRITERS LABORATORY.3. CABINET SHALL BE BONDED WITH MIN. NO. 8 COPPER BOND AND GROUND OR 7STRAND PER APPLICABLE N.E.C. CODES AND PER STANDARD SPECIFICATIONFOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION.4. CONDUIT BETWEEN CABINET AND THE EDISON COMPANY VAULT SHALL BE TWOINCH MINIMUM5. CONDUITS SHALL EXTEND INTO THE CABINET TWO INCHES ABOVE FLOOR ANDHAVE APPROVED CONDUIT BUSHINGS.6. IN LANDSCAPED PARKWAYS, THE TOP OF THE FOUNDATION SHALL BE ASSHOWN ON APPROVED STREET LIGHT PLANS. THE TOP OF THE FOUNDATION ATOTHER LOCATIONS SHALL BE LEVEL WITH THE ADJACENT SIDEWALK.7. CABINET FOR STREET LIGHT SERVICE ONLY SHALL HAVE CIRCUIT BREAKERPANEL PLACED INSIDE CABINET.8. INSTALLATIONS SHALL BE 3 INCHES FROM CURB FACE WITH THE FRONT OF THECABINET FACING AWAY FROM THE STREET IN LANDSCAPED PARKWAYS ORWHEN THE SIDEWALK ADJACENT TO CURB IS WIDER THAN 5 FT, AS INCOMMERCIAL AREAS. WHEN SIDEWALK IS INSTALLED ADJACENT TO CURB ANDIS 5 FT WIDE, THE CABINET SHALL BE INSTALLED BEHIND THE SIDEWALK WITHTHE FRONT OF THE CABINET FACING TOWARDS THE STREET.STREET LIGHT STANDARD AT CURB RETURN SHALL BE 4 FT FROM E.C.R.STREET LIGHT STANDARD LOCATION FOR AREAS WHERE NO SIDEWALK IS REQUIRED, WHERE SIDEWALK ISADJACENT TO THE R.O.W. LINE, WHERE SIDEWALK IS ADJACENT TO CURB AND WHERE SIDEWALKS AREGREATER THAN 5 FT, AS IN COMMERCIAL AREAS, FOUNDATION AND CAP TO BE POURED TO BACK OF CURB.STREET LIGHT STANDARDS IN RESIDENTIAL AREAS WHERE 5 FT SIDEWALK ISADJACENT TO CURB SHALL BE PLACED BEHIND THE SIDEWALK AND 8 FTMASTARM LENGTH ALLOWED TO MATCH THE EXISTING LAYOUT ONLY.STREET LIGHTNO.6PULL BOX4'4'ADA ACCESS24"18" MIN.LIGHT STANDARDMAST ARM SHALL BE COMPATIBLEWITH POLE TENON & CONFORM TOA.S.T.M. DESIGNATION: A120GALVANIZED EIGHT FEET MASTARMLENGTH ALLOWED WHEN LIGHTSTANDARD PLACED BEHIND FIVEFEET WIDE SIDEWALK TO MATCHEXISTING STREET LIGHT LAYOUT.2"X6" DOOR OPENING TOSTREET SIDEFOR FOUNDATION DIMENSIONSAND SPECIFICATIONS SEESTANDARD DRAWING CDRAWING ADRAWING BDRAWING C48"5"2"1".5"24" MIN48" MAX1.5"1.5"12"24"36"36"2124578910113N.T.S.N.T.S.DRAWING D30" Square22"15-9/16"MARBELITE ELECTROLIERFOUNDATION DETAIL6FLOW LINECURBELECTROLIER22" BOLT CIRCLEFOUR 1" ANCHOR BOLTS AND NUTSMEETING ASTM A-307TO LUMINAIRE2" (MIN) CONDUITTO UTILITY POWERSOURCE (NOTE 4)FRONTC XXXXX * R E GISTERED PROFESSIONAL ENGINEER *STATE OF CALIFORNIA ENGINEER'SNAMECIVIL
72
TRENCH AND FOUNDATION DETAILS
PRINCETON AVENUE 3
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 119838
VARIES
VARIES VARIES
VARIES VARIES
AC PAVEMENT
PRINCETON AVE.
TYPICAL STREET SECTION
C/L
FIGURE 3
TRENCH
30"
18"
43"
34"
1-2" PVC SCH. 40
SL
NATIVE SOIL
BACKFILL
FS
NATIVE GROUND
TYPICAL TRENCH SECTION
FIGURE 2
18"
43"
34"
1-2" PVC SCH. 40
SL
NATIVE SOIL
BACKFILL
FS
NATIVE GROUND
TYPICAL TRENCH SECTION
FIGURE 1
2-4" PVC SCH. 40
COMM
18"
43"
18"
TRENCH
18"
43"
3'6"
C XXXXX
* REGISTERED P R O F E S SIONA
L
E
NGI
NEER *S
T
ATE OF C A L IF O R NIAENGIN E E R'S N
A
MECI V I L
73
HANDHOLE AND PEDESTAL DETAILS
PRINCETON AVENUE 4
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 119838
HN1730 ELECTRICAL
HANDHOLE
·
·
·
12"
22"
35"
30"
12"
12"
·
·
·
·
12"
138"
1014"
1634"
12"
1438"
1934"
1512"
10 116"
2"
HN1017 ELECTRICAL
BOX
ST
R
E
E
T
L
I
G
H
T
Enclosed Controls
32" Metered Commercial Pedestal Drawings
“S” Style 32" Metered Commercial Pedestal (with one or two meters)
PHOTO CELL WINDOWWITH SHIELD(IF APPLICABLE)
32"20"
(2)PADLOCKBRACKETSEXTENDSTHROUGHDOOR
SECURITYFOR
MOUNTING BASE DETAIL
SEALABLEPAD LOCKABLEMETER COVER
60"
52"
18"
16 1/2" 11 3/4"
14 1/4"
UTILITYSECTION 7 3/4"
CUSTOMERSECTION
23.5" UTILITY
TERMINATION
LANDING MIN.
HINGEDDEADFRONT
LIFT-OFFSERVICECOVER
MOUNTING BASE MOUNTING BASE
PEDESTAL
MOUNTING HOLES
3" RECOMMENDED MIN.
FOUNDATION EXTENSION
ALL SIDES. 6" REC.
MINIMUM DEPTH.
32"
31"
30 1/2"
29"ENCLOSURE
17"
DEPTH
36" MIN.
CLEARANCE
REQUIRED PER
N.E.C 110-1
TYPICALFRONT & BACK
UTILITYSECTION
C XXXXX
* REGISTERED P R O F E S SIONA
L
E
NGI
NEER *S
T
ATE OF C A L IF O R NIAENGIN E E R'S N
A
MECI V I L
74
+++++++++C
C
C C C C C C C C
C
C
C
C
C
C
C
G G
G
G
G
G
G
G
G G G G G G
G
G
GEEW
W W
G
C
C
C C C C C
WWWWWCOMM-HH56 TO COMM-HH57
IN: 2 - 4" DUCT BANK 0+559+764+202+725+506+908+299+709+007+756+204+803+402+005+56∠ 90°R: 4'2+78∠: 90°R: 4'4+26∠: 90°R: 4'6+968+353+464+866+267+819+062+06STREET LIGHT IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 1+00.00 TO STA. 10+00.00
EXISTING CURB,
GUTTER AND
SIDEWALK TO
REMAIN
EXISTING CURB, GUTTER AND
SIDEWALK TO REMAIN
R.O.W.
N1927638.06
E6298929.89
5
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 119838
IN: 2 - 1/C #8 600V
VD:1.01%
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
CI: HANDHOLE 2
10.5"x17"x12" HH
IN: 2-1/C # 6 CU 600V (144' TO HH3) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 1
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (172' TO HH2) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 3
10.5"x17"x12" HH
IN: 2-1/C # 6 CU 600V (154' TO HH4) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU CU 600V
HH2 TO HH3
IN: 2 - 1/C #6 CU 600V
HH1 TO HH2
IN: 2 - 1/C #6 CU 600V
IN: 2 - 1/C #8 CU 600V
E E
E
E
E
E
E
E
E
E
E
E
E
1CI:2"
148'HH1
1CI:2"
130'HH2
1CI:2"
140'HH3
HH3 TO HH4
IN: 2 - 1/C #6 CU 600V
HH4 TO HH5
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH4
HH5 TO HH6
IN: 2 - 1/C #6 CU 600V
1CI:2"
141'HH5
1CI:2"
140'HH6
HH6 TO HH7
IN: 2 - 1/C #6 CU 600V
HH33 TO HH34
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH33
HH34 TO HH35
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH34
HH35 TO HH36
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH35
HH36 TO HH37
IN: 2 - 1/C #6 CU 600V
1CI:2"
155'HH36 HH38 TO HH39
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH38
1CI:1.5"
6'33
1CI:1.5"
6'34
1CI:1.5"
6'35
1CI:1.5"
6'36
1CI:1.5"
6'37
HH37 TO HH38
IN: 2 - 1/C #6 CU 600V
1CI:2"
125'HH37
1CI:1.5"
6'38
1CI:1.5"
6'1
1CI:1.5"
6'2
1CI:1.5"
6'3
1CI:1.5"
6'4
1CI:1.5"
6'5
1CI:1.5"
6'6
CI: HANDHOLE 5
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (155' TO HH6) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 4
10.5"x17"x12" HH
IN: 2-1/C # 6 CU 600V (154' TO HH5) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2- 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 6
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH7) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 34
10.5"x17"x12" HH
IN: 2-1/C 6# CU 600V (154' TO HH35) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 33
10.5"x17"x12" HH
IN: 2-1/C # 6CU 600V (154' TO HH34)~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 35
10.5"x17"x12" HH
IN: 2-1/C # 6 CU 600V (154' TO HH36) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 37
10.5"x17"x12" HH
IN: 2-1/C # 6CU 600V (139' TO HH38) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 36
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (169' TO HH37) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 38
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH39) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 34
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH34) ~ZUGC 125
CI: STREET LIGHT 33
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH33) ~ZUGC 125
CI: STREET LIGHT 35
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH35) ~ZUGC 125
CI: STREET LIGHT 37
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH37) ~ZUGC 125
CI: STREET LIGHT 36
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH36) ~ZUGC 125
CI: STREET LIGHT 38
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH38) ~ZUGC 125
CI: STREET LIGHT 2
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH2) ~ZUGC 125
CI: STREET LIGHT 1
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH1) ~ZUGC 125
CI: STREET LIGHT 3
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH3) ~ZUGC 125
CI: STREET LIGHT 5
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH5) ~ZUGC 125
CI: STREET LIGHT 4
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH4) ~ZUGC 125
CI: STREET LIGHT 6
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH6) ~ZUGC 125
TRENCH 30"
FROM CURB
JOINT TRENCH
UNDER SIDEWALK
E
E
E
E
E
E E E E E E
TRENCH
UNDER SIDEWALK
E
E
E
E
E
E
E
E
E
E
E
E E ECOMM
COMM COMM
E
E
E
E
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CI: COMM-HANDHOLE 56
17"X30"X12"
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0030
1 - REINFORCED CONCRETE NON-TRAFFIC EXTENSION ~24-0480
1 - FIBERLYTE LID ~24-1177
2 - 3/8"X2-1/4" PANTAHEAD BOLT
E E E E E
E
COMM COMM COMM COMM
COMM
E
E
E
E
COMM
COMM
COMM
E
COMM COMM
ECOMM
E
E
E
E
E
E
CI:2 4"
1765'56
33
34
35
36
37
38
56
33
34
35
36
37
38
1
2
3
4
5
6
1
2
3
4
5
6
C XXXXX
* REGISTERED P R O F E S SIONA
L
E
NGI
NEER *S
T
ATE OF C A L IF O R NIAENGIN E E R'S N
A
MECI V I L
75
+
+
+
+
+
+++EG
G
G
G
G
G
G
G
G
C C C C C
C
C
C
C
C
C
C C C
C
C
C
E
E
E E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C 16+76INT POINT A16+96INT POINT A10+4012+5612+5011+1011+1613+9015+3016+7018+1119+4513+2014+611+60017+4018+8010+4611+8613+2614+671+606∠: 90°R: 4'17+3418+8619+3918+0516+7615+3613+96STREET LIGHT IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 10+00.00 TO STA. 20+00.00
PROPOSED R.O.W.EXISTING CALTRANSDRIVEWAY6
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 119838
HH12 TO HH13
IN: 2 - 1/C #6 CU 600V
1CI:2"
134'HH12
HH13 TO HH14
IN: 2 - 1/C #6 CU 600V
1CI:2"
133'HH13
HH45 TO HH46
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH45
HH44 TO HH45
IN: 2 - 1/C #6 CU 600V
HH39 TO HH40
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH39 HH40 TO HH41
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH40
HH41 TO HH42
IN: 2 - 1/C #6 CU 600V
1CI:2"
141'HH41
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'12
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'13
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'39
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'40
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'41
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'45
CI: HANDHOLE 8
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH9) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 7
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH8) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 9
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH10) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 11
10.5"x17"x12"
IN: 2-1/C #6 CU 600V W/PILC (143' TO HH12) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 10
10.5"x17"x12"
IN: 2-1/C #6 CU 600V (154' TO HH11) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 12
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (148' TO HH13) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 40
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH41) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 39
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH40) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 41
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (155' TO HH42) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 43
10.5"x17"x12"
IN: 2-1/C #6 CU 600V W/PILC (142' TO HH44)~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 42
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (153' TO HH43) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 44
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (162' TO HH45) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 39
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH39) ~ZUGC 125
CI: HANDHOLE 45
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH46) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 40
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH40) ~ZUGC 125
CI: STREET LIGHT 42
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH42) ~ZUGC 125
CI: STREET LIGHT 41
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH41) ~ZUGC 125
CI: STREET LIGHT 43
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH43) ~ZUGC 125
CI: STREET LIGHT 7
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH7) ~ZUGC 125
CI: STREET LIGHT 8
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH8) ~ZUGC 125
CI: STREET LIGHT 10
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH10) ~ZUGC 125
CI: STREET LIGHT 9
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH9) ~ZUGC 125
CI: STREET LIGHT 11
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH11) ~ZUGC 125
CI: HANDHOLE 13
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (147' TO HH14) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 12
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH12) ~ZUGC 125
CI: STREET LIGHT 13
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH13) ~ZUGC 125
CI: STREET LIGHT 45
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH45) ~ZUGC 125
CI: STREET LIGHT 44
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH44) ~ZUGC 125
CI: PEDESTAL 2
IN: 1 - PED UG CONTROLLER FOR ST LT ~ZUSP 001
1 - PED UG SRVC TRAFFIC & SAFETY LTS W/BAR ~ ZUSP 002
1 - BAR 200/5 2.5A 120/240 1P 3W 3CKT TOT ~ZMTR 007
2 - 1/C #4 CU 600V CBL SL IN RGD DUCT (20' TO HH44) ~ZUGC 236
CI: PEDESTAL 1
IN: 1 - PED UG CONTROLLER FOR ST LT ~ZUSP 001
1 - PED UG SRVC TRAFFIC & SAFETY LTS W/BAR ~ ZUSP 002
1 - BAR 200/5 2.5A 120/240 1P 3W 3CKT TOT ~ZMTR 007
2 - 1/C #4 CU 600V CBL SL IN RGD DUCT (20' TO HH11) ~ZUGC 236
TRENCH
UNDER
SIDEWALK
JOINT TRENCH
UNDER SIDEWALK
PED1 TO HH11
IN: 2 - 1/C #8 CU 600V
HH7 TO HH8
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH7
HH8 TO HH9
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH8
HH9 TO HH10
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH9
HH10 TO HH11
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH10
1CI:2"
129'HH11
1CI:2"
152'HH44
HH42 TO HH43
IN: 2 - 1/C #6 CU 600V
1CI:2"
139'HH42
1CI:2"
128'HH43
1CI:1.5"
6'7
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'8
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'9
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'10
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'11
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'42
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'43
1CI:1.5"
6'44
HH11 TO HH12
IN: 2 - 1/C #6 CU 600V
SCE
S
C
E
S
C
E
SCE SCE SCE SCE SCE SCE SCE SCE
S
C
E
S
C
E
SCESCESCESCEPED2 TO HH44
11+80HH43 TO HH44
IN: 2 - 1/C #6 CU 600V
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
COMM-HH57 TO
COMM-HH58
IN: 2 - 4" DUCT BANK18+20CI: COMM-HANDHOLE 57
17"X30"X12"
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0030
1 - REINFORCED CONCRETE NON-TRAFFIC EXTENSION ~24-0480
1 - FIBERLYTE LID ~24-1177
2 - 3/8"X2-1/4" PANTAHEAD BOLT
E
E
E
E
E
E
E
E
E
E
E
E
E E E
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
E
E
E
E
E
E E E E E
E E
E
E
E
1 2"
20'
PED2
1 2"
20'
PED1
EXISTING VAULT
V5964 TO PEDESTAL
CI:2 4"
410'57
39
40
41
42
43
44 39
57
45 40
41
42
2
45
44
43
12
13
111
10
9
8
7
1310
11
129
7
8
E
COMM COMM
COMM
COMM
E E
E
E
COMM
COMM
COMM
COMM
COMM
COMM
COMM
E
E
E
E
E
E
E
C XXXXX
* REGISTERED P R O F E S SIONA
L
E
NGI
NEER *S
T
ATE OF C A L IF O R NIAENGIN E E R'S N
A
MECI V I L
76
++++++++++C
C
C
C
C
G
G
G
SSSS
S
S
SSGGGGE
E
E
EG
G
G
G
G
G
G
G G
CC
E
E
E
E
E E E E
E
E
E
E
E
E
E
E
E E E
C
C
C
C
C
C C C
C
C
C
C
G
G
G
G
G
G
G
G G
C
C
C
C
C
C
C
C
C
C
C C
C
C
C
C C C
C
C
CC
C
WWWIN: 2 - 1/C #8 CU 600V
JOINT TRENCH
UNDER SIDEWALK
24+4024+3420+2021+5323+0025+8027+1428+6020+7823+7025+1027+9029+4226+3920+2621+4723+0625+8627+0828+6629+36∠: 90°R: 4'27+84∠: 90°R: 4'26+33∠: 90°R: 4'25+1623+7622+3620+72IN: 2 - 1/C #8 CU 600V
STREET LIGHT IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 20+00.00 TO STA. 30+00.00
R.O.W.
7
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 119838
IN: 2 - 1/C #8 CU 600V
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
HH14 TO HH15
IN: 2 - 1/C #6 CU 600V
1CI:2"
164'HH14
HH15 TO HH16
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH15
HH16 TO HH17
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH16
HH17 TO HH18
IN: 2 - 1/C #6 CU 600V
1CI:2"
117'HH17
HH18 TO HH19
IN: 2 - 1/C #6 CU 600V
1CI:2"
151'HH18
HH19 TO HH20
IN: 2 - 1/C #6 CU 600V
1CI:2"
152'HH19
HH20 TO HH21
IN: 2 - 1/C #6 CU 600V
1CI:2"
78'HH20
HH46 TO HH47
IN: 2 - 1/C #6 CU 600V
1CI:2"
121'HH46 HH47 TO HH48
IN: 2 - 1/C #6 CU 600V
1CI:2"
159'HH47 HH48 TO HH49
IN: 2 - 1/C #6 CU 600V
1CI:2"
128'HH48
HH49 TO HH50
IN: 2 - 1/C #6 CU 600V
1CI:2"
152'HH49
HH50 TO HH51
IN: 2 - 1/C #6 CU 600V
1CI:2"
122'HH50
HH51 TO HH52
IN: 2 - 1/C #6 CU 600V
1CI:2"
158'HH51
HH52 TO HH53
IN: 2 - 1/C #6 CU 600V
1CI:2"
560'HH52
1CI:1.5"
6'46
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'47
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'48
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'49
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'50
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'51
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'52
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'14
1CI:1.5"
6'15
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'16
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'17
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'18
1CI:1.5"
6'19
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'20
CI: HANDHOLE 15
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH16) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 14
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (178' TO HH15) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 16
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH17) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 18
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (165' TO HH19) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 17
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (131' TO HH18) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 19
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (166' TO HH20) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 47
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (173' TO HH48) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 46
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (135' TO HH47) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 48
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (142' TO HH49) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 50
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (136' TO HH51) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 49
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (166' TO HH50) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 51
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (172' TO HH52) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 46
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH46) ~ZUGC 125
CI: HANDHOLE 52
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (574' TO HH53) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 47
IN:1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH47) ~ZUGC 125
CI: STREET LIGHT 49
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH49) ~ZUGC 125
CI: STREET LIGHT 48
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH48) ~ZUGC 125
CI: STREET LIGHT 50
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH50) ~ZUGC 125
CI: STREET LIGHT 14
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH14) ~ZUGC 125
CI: HANDHOLE 20
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (92' TO HH21) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 15
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH15) ~ZUGC 125
CI: STREET LIGHT 17
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH17) ~ZUGC 125
CI: STREET LIGHT 16
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH16) ~ZUGC 125
CI: STREET LIGHT 18
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH18) ~ZUGC 125
CI: STREET LIGHT 52
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH52) ~ZUGC 125
CI: STREET LIGHT 51
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH51) ~ZUGC 125
CI: STREET LIGHT 20
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH20) ~ZUGC 125
CI: STREET LIGHT 19
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH19) ~ZUGC 125
TRENCH UNDER
SIDEWALK 22+30E
E
E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
TRENCH 30"
FROM CURB
E
E
E
E
E E
COMM-HH58 TO
COMM-HH59
IN: 2 - 4" DUCT BANK 22+30CI: COMM-HANDHOLE 58
17"X30"X12"
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0030
1 - REINFORCED CONCRETE NON-TRAFFIC EXTENSION ~24-0480
1 - FIBERLYTE LID ~24-1177
2 - 3/8"X2-1/4" PANTAHEAD BOLT
E
E
E
E
E
COMM
COMM
COMM
COMM
COMM
E
E
E
E
E
E
E
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
E E E
E
COMM COMM COMM
COMM
COMM COMM
COMMEE E
COMM
COMM
COMM
E
E
E
CI:2 4"
1458'58
46
47
48
49
50
51
52
58
46
47
48
49
50
51
52
16
17
18
19
20
20
14
1519
18
1714
15
16
E
E
E
E
E
COMM
COMM
COMM
COM
M
E
E
E
E
E
E
E
COM
M
COMM
COMM
COMM
COMM
COMM
C XXXXX
* REGISTERED P R O F E S SIONA
L
E
NGI
NEER *S
T
ATE OF C A L IF O R NIAENGIN E E R'S N
A
MECI V I L
77
++++++++++++
C C C C C C C C C
C C C
C
C
C
C
C
C
C
C
C CCC
C
C
C CCC CC
C
C
C CCC
C
C
EG
G
GGGGG
G
G
G
G
GGS S S S S
SSW
W
W WWWWWW
G G G G G G G
+GGGWWWWWWW
IN: 2 - 1/C #8 CU 600V37+0030+0830+7931+7332+7033+5034+9036+3038+0234+2034+2635+6636+9430+14∠: 90°R: 4'30+85∠: 90°R: 4'31+79∠: 90°R: 4'32+76∠: 90°R: 4'33+56∠: 90°R: 4'34+96∠: 90°R: 4'36+36∠: 90°R: 4'38+7039+4238+08∠: 90°R: 4'38+76∠: 90°R: 4'39+48∠: 90°R: 4'40+1240+06∠: 90°R: 4'40+8240+76∠: 90°R: 4'STREET LIGHT IMPROVEMENT PLAN
PRINCETON AVENUE
STA. 30+00.00 TO END
R.O.W.
R.O.W.
N1928185.19
E6302172.21
EXISTING
R.O.W.577.04
FS
579.62
FS
8
PUBLIC WORKS DEPARTMENT
CITY OF MOORPARK
ENGINEERING DIVISIONMOORPARKCALIF
O
R
NI
AINCOR
P
O
RATED J U L Y 119838
1 2"HH55
IN: 2 - 1/C #8 CU 600V
IN: 2 - 1/C #8 CU 600V
E E E E E E E E E E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E EE EEE
E
EHH21 TO HH22
IN: 2 - 1/C #6 CU 600V
1CI:2"
71'HH21
HH22 TO HH23
IN: 2 - 1/C #6 CU 600V
HH23 TO HH24
IN: 2 - 1/C #6 CU 600V
1CI:2"
97'HH23
HH24 TO HH25
IN: 2 - 1/C #6 CU 600V
HH25 TO HH26
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH25
HH26 TO HH27
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH26
HH27 TO HH28
IN: 2 - 1/C #6 CU 600V
1CI:2"
172'HH27
HH28 TO HH29
IN: 2 - 1/C #6 CU 600V
1CI:2"
68'HH28
HH30 TO HH31
IN: 2 - 1/C #6 CU 600V
1CI:2"
58'HH30
HH31 TO HH32
IN: 2 - 1/C #6 CU 600V
HH29 TO HH30
IN: 2 - 1/C #6 CU 600V
1CI:2"
72'HH29
1CI:2"HH32
HH53 TO HH54
IN: 2 - 1/C #6 CU 600V
1CI:2"
140'HH53
HH54 TO HH55
IN: 2 - 1/C #6 CU 600V
1CI:2"
128'HH54
IN: 2 - 1/C #6 CU 600V
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'21
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'22
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'23
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'24
1CI:1.5"
6'25
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'26
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'27
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'28
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'29
1CI:1.5"
6'30
IN: 2 - 1/C #8 CU 600V1CI:1.5"
6'31
VD:1.70%
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'53
IN: 2 - 1/C #8 CU 600V
1CI:1.5"
6'54
IN: 2 - 1/C #8 CU 600V
VD: 1.21%
1CI:1.5"
6'55
CI: HANDHOLE 22
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (108' TO HH23) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 21
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (85' TO HH22) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 23
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (111' TO HH24) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 25
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH26) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
IN: HH24
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (94' TO HH25) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 26
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH27) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 28
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (82' TO HH29) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 27
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (186' TO HH28) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 29
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (86' TO HH30) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 31
10.5"x17"x12" HH
IN: 2-1/C #6 CU6 00V (84' TO HH32) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 30
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (72' TO HH31) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 32
10.5"x17"x12" HH
IN: 1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: STREET LIGHT 22
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH22) ~ZUGC 125
CI: STREET LIGHT 21
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH21) ~ZUGC 125
CI: STREET LIGHT 23
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH23) ~ZUGC 125
CI: STREET LIGHT 24
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH24) ~ZUGC 125
CI: STREET LIGHT 26
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH26) ~ZUGC 125
CI: STREET LIGHT 25
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH25) ~ZUGC 125
CI: STREET LIGHT 27
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH27) ~ZUGC 125
CI: STREET LIGHT 28
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH28) ~ZUGC 125
CI: HANDHOLE 54
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (142' TO HH55) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
ICI: HANDHOLE 53
10.5"x17"x12" HH
IN: 2-1/C #6 CU 600V (154' TO HH54) ~ZUGC 235
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
CI: HANDHOLE 55
10.5"x17"x12" HH
IN: 1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0020
1 - REINFORCED CONCRETE EXTENSION ~ 24-0470
1 - CONCRETE STEEL REINFORCED BOLT DOWN LID W/ STREET LIGHT MARKED ~HN1017-L01
2 - 1P 4-WAY INSL BAR 1-SET SCREW #8 - 350 ~ZUSC 004
IN: STREET LIGHT 54
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH54) ~ZUGC 125
IN: SREET LIGHT 53
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH53) ~ZUGC 125
IN: STREET LIGHT 55
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH55) ~ZUGC 125
CI: STREET LIGHT 29
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH29) ~ZUGC 125
CI: STREET LIGHT 30
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH30) ~ZUGC 125
CI: STREET LIGHT 31
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH31) ~ZUGC 125
CI: STREET LIGHT 32
IN: 1 - SL 30' ELECT CONC 1-8' BKT ~ ZSLP 614 (ELECTROLIER)
1 - SL 82W COBRA HEAD STYLE LED LUMINAIRE ~SAP10210239
2 - 1/C #8 CU 600V CBL SL IN RGD DUCT (6' TO HH32) ~ZUGC 125
1CI:2"
94'HH22
TRENCH 30"
FROM CURB
JOINT TRENCH
UNDER SIDEWALK
1CI:2"
80'HH24 35+60E
E
E
E
E
E 36+88COMM-HH59
IN: 2 - 4" DUCT BANK
CI: COMM-HANDHOLE 59
17"X30"X12"
1 - REINFORCED CONCRETE NON-TRAFFIC BOX ~24-0030
1 - REINFORCED CONCRETE NON-TRAFFIC EXTENSION ~24-0480
1 - FIBERLYTE LID ~24-1177
2 - 3/8"X2-1/4" PANTAHEAD BOLT
E E E E E E E E E E E E E
E E COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
COMM
COMM
COMM
COMM
COMM
COMM
1CI:1.5"
6'32
CI:2 4"
59
53
54
55 54
53
59 55
29
30
32
31
21
22
23
24 28
27
26
25 29
30
31
32 24
23
22
21 25
26
27
28
E
E E
COMM
COMM
COMM
COMM
COMM
COMM
E
E
E
E
E
1CI:2"
70'HH31
E E E E
C XXXXX
* REGISTERED P R O F E S SIONA
L
E
NGI
NEER *S
T
ATE OF C A L IF O R NIAENGIN E E R'S N
A
MECI V I L
78