HomeMy WebLinkAboutAGENDA REPORT 2021 1123 PC ITEM 08BCITY DFMOORPARk,CALIFORNIA
Planning Commission Meeting
of
ACTION
BY:
November 23.ZUZl
Approved Staff Recommendation
with Modified Conditions nf
Approval, Including Adoption of
Resolution No. PC'2021'665. |
K. Valencia
Item:
8.13.
B. Consider Resolution No. PC -2021-665, Recommending That the City Council
Item: 8.13.
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable Planning Commission
FROM: Shanna Farley, Principal Planner
DATE: 11/23/21 Regular Meeting
SUBJECT: Consider Resolution No. PC -2021-665, Recommending That the City
Council Approve Zoning Ordinance Amendment No. 2021-02 and the
First Amendment to the Development Agreement Between the City of
Moorpark and NLA 118, LLC to Expand the Potential Uses that May be
Conducted Within the Commercial Planned Development Zone at
14349 White Sage Road, and Adopt a Negative Declaration Pursuant
to the California Environmental Quality Act in Association Therewith,
on the Application of Thomas Schlender on behalf of NLA 118, LLC.
STAFF RECOMMENDATION
Open the public hearing, accept public testimony, and close the public hearing;
and,
2. Adopt Resolution No. PC -2021-665 recommending to the City Council approval of
Zoning Ordinance Amendment (ZOA) No. 2021-02, approval of the First
Amendment to the Development Agreement (DA) No. 2004-02 between the City
of Moorpark, and NLA 118, LLC, and adoption of a Negative Declaration in
association therewith.
BACKGROUND
On October 19, 2005, the City Council adopted Ordinance No. 322 authorizing the
Development Agreement between the City of Moorpark and NLA 118, LLC, and
Resolution No. 2005-2398 approving General Plan Amendment (GPA) No. 2004-04,
Commercial Planned Development (CPD) No. 2004-03, and Conditional Use Permit
(CUP) No. 2005-04 for the construction and operation of a 115,000 square -foot appliance
store with distribution and warehousing (Warehouse Discount Center) at the subject
property and a 17,000 square -foot furniture store on an adjacent property.
Honorable Planning Commission
ZOA No. 2021-02 and DAA No. 2004-02
11/23/2021 Regular Meeting
Page 2
The initial entitlement required a General Plan Amendment (GPA) to the Land Use
Element of the Land Use Category for General Commercial in Section 5.1 of the Land
Use Element (Page 25) amended to allow furniture and appliance stores on sites greater
than eight acres adjacent to both a freeway interchange and an arterial roadway and that
are not adjacent to planned residential uses may be developed with retail furniture or
appliance stores with attached distribution/warehouse facilities at a maximum 0.38 FAR
when all other standards of the Zoning Ordinance are met.
Similarly, the City Council adopted Ordinance No. 343 adopting ZOA No. 2005-03 to
amend Chapter 17 (Zoning) of the Moorpark Municipal Code (MMC), which includes the
updated categories and site information as noted in the GPA.
The DA outlined additional permitted uses that may be operated on the property, which
include furniture and appliance stores. Warehouse Discount Center (WDC), an appliance
retailer and distributor, has operated on the site since construction was completed in
2006.
PROJECT DESCRIPTION
On May 4, 2020, Thomas Schlender of NLA 118, LLC filed an application consisting of
ZOA No. 2021-02 and the First Amendment to DA No. 2004-02 to amend Chapter 17
(Zoning) of the MMC and an existing development agreement for the property located at
14349 White Sage Road. The amendments would allow for additional uses on the subject
property with approval of a CUP, including laboratories, manufacturing and assembly, film
production, and warehousing.
No development is proposed with this request. The proposed amendments would
introduce additional conditionally permitted uses within the CPD zone that could be
operated on the property at 14349 White Sage Road (Attachment 1) and as outlined in
the First Amendment to the Development Agreement (Attachment 1, Exhibit C).
EXISTING AND SURROUNDING LAND USES
The following table summarizes the existing General Plan, zoning, and existing land uses
on the subject property and vicinity.
General Plan / Zoning ! Existing Land Use
Location
General Plan 1
Zoning
a Existing
Designation
gna
Desition
Land Use
Commercial Planned
Project Site
General Commercial (C-2)
Development (CPD)
Light industrial building
Limited Industrial Zone (M-2)
Railroad tracts
North
Medium Industrial (1-2)
and Open Space OS
South
General Commercial (C-2)
Commercial Planned
Hotel
PA
Honorable Planning Commission
ZOA No. 2021-02 and DAA No. 2004-02
11/23/2021 Regular Meeting
Page 3
Figure 1: Project Location with Subject Property Highlighted
General Plan and Zoning Consistency
The General Plan designation of the project site is General Commercial (C-2) and
provides for a wide range of retail and service activities. The designation is intended for
Development (CPD)
East �F-0—pen
Space (OS -1)
OS
Open Space
West
Light Industrial (1-1)
Industrial ParkOZSone (M-1) and
Industrial/Freeway
Figure 1: Project Location with Subject Property Highlighted
General Plan and Zoning Consistency
The General Plan designation of the project site is General Commercial (C-2) and
provides for a wide range of retail and service activities. The designation is intended for
Honorable Planning Commission
ZOA No. 2021-02 and DAA No. 2004-02
11/23/2021 Regular Meeting
Page 4
uses ranging from commercial shopping centers to office and professional business
services. The proposed amendment to the zoning code to allow expanded services is
consistent with the wide variety of uses intended in C-2.
The zoning designation of the subject property is CPD. The purpose of the CPD zone is
to encourage the development of coordinated, innovative and efficient commercial sites
and to provide areas for a wide range of commercial retail and business uses, including
stores, shops and offices supplying commodities or performing services for the
surrounding community. Various uses are permissible in the CPD, as identified in MMC
Section 17.20.060 (Permitted Uses in Commercial and Industrial Zones). The CPD zones
provides a wide variety of uses ranging from retail and service uses, eating and drinking
places, office and professional uses, and other public and semi-public uses.
Due to the location of the subject property, the existing development on the site, and its
proximity to State Route 23, nearby industrial and commercial uses, the following
expanded uses would be consistent with the intent of the zone to provide a wide range of
business uses for the surrounding community. The proposed uses would require a CUP,
which would require review by the Planning Commission and environmental review
consistent with the California Environmental Quality Act (CEQA). The proposed
amendment to the CPD zone would allow additional uses to be proposed on a freeway -
adjacent property with sufficient size to allow for appropriate buffers.
ANALYSIS
General Discussion
The Applicant has considered leasing or selling the 115,000 square -foot building. Based
upon initial discussions with potential tenants, the Applicant has determined that the
unique size of the building and arrangement of the floor space is not marketable to any
of the existing permitted uses within the CPD Zone. The majority of existing uses
permitted in the CPD zone focus on commercial retail, services, and office. The additional
uses proposed to be added, including laboratories, manufacturing/assembly, film
production, and warehousing, are more suitable for the existing building on the property.
Pursuant to MMC Section 17.44.050 and 15.40, amendments to the zoning ordinance
and development agreements are legislative acts. The Planning Commission shall
consider these requests and provide a recommendation to the City Council on whether
to approve, modify, or deny the proposal.
Proposed Zoning Ordinance Amendment
The proposed amendments to the MMC Zoning Code include Chapter 17.08 (Definitions)
and Chapter 17.20 (Uses by Zone).
Honorable Planning Commission
ZOA No. 2021-02 and DAA No. 2004-02
11/23/2021 Regular Meeting
Page 5
Definitions:
Chapter 17.08 (Definitions) provides the definitions of words and terms in the MMC
Zoning Code. The following terms are proposed to be added to Chapter 17.08
(Definitions):
"Motion picture and television production studio" shall mean a fixed place of business
where filming activities (motion or still photography) are regularly conducted upon the
premises.
"Photography Studio" shall mean a fixed place of business where still photography
activities are regularly conducted upon the premises.
Use Tahle-
The proposed amendments to the MMC Zoning Code include Chapter 17.20 (Uses by
Zone). Chapter 17.20 (Uses by Zone) lists the uses that are allowed within each specific
zoning district in the City and the permit required to establish the use. There are two use
tables contained in the MMC Zoning Code: Table 17.20.050 (Permitted Uses in Open
Space, Agricultural, Residential, and Special Purpose Zones); and Table 17.20.060
(Permitted Uses in Commercial and Industrial Zones). The ZOA would include the
following additions to Table 17.20.060 as shown below:
Table 17.20.060
PERMITTED USES IN COMMERCIAL AND INDUSTRIAL ZONES
[Blank] = Not permitted
AP = Administrative Permit
CUP = Conditional Use Permit
NZC = No Zoning Clearance required
TUP = Temporary Use Permit
ZC = Permitted by Zoning Clearance
Zones
C -O
C-1
CPD
C -OT
M-1
M-2
I
C. Office and Professional Uses
2. Laboratories: research and scientific
AP
CUP'
AP
AP
6. Motion picture and television production
CUP'
D. Manufacturing, Assembly, Distribution, and
Warehousing Uses
4. Manufacturing and assembly including, but not limited
to, appliances, cabinets, cleaners, clothing,
computers, cosmetics, detergents, electronics,
CUP'
ZC
ZC
furniture, leather products, machinery, medical and
scientific instruments, paper, perfumes,
pharmaceuticals, photographic and optical goods,
Honorable Planning Commission
ZOA No. 2021-02 and DAA No. 2004-02
11/23/2021 Regular Meeting
Page 6
Zones
C -O
C-1
CPD
C -OT
M-1
M-2
I
C. Office and Professional Uses
plastic products, signs and advertising displays,
soap, textiles and other uses which the community
development director determines to be similar when
in compliance with Section 17.20.030 (cif within 100
feet of a residentially zoned property an
administrative permit is required)
7. Warehousing
CUP',2
AP
AP
1) Sites greater than eight (8) acres that are adjacent to both a freeway interchange and an arterial roadway as
identified in the circulation element and that are not adjacent to planned residential uses
2) With at least 10% of the floor area of the building dedicated to retail uses. Warehousing uses that will create a
point-of-sale allocation to the City of Moorpark and provide evidence of generating more than ten -million dollars
($10,000,000) in annual sales may dedicate less than 10% of the floor area to retail uses.)
As noted in footnote one, the proposed uses would only be allowed on sites greater than
eight (8) acres that are adjacent to both a freeway interchange and an arterial roadway
as identified in the Circulation Element of the General Plan and that are not adjacent to
planned residential uses. The subject property is the only CPD -zoned site within the City
of Moorpark that meets the aeoaraphic criteria and therefore the only oroi3erty that may
establish the uses proposed with this ZOA
Proposed Development Agreement Amendment
A development agreement may be amended or terminated by mutual consent of the
parties to the agreement, as outlined in Chapter 15.40 (Development Agreements) of the
MMC. Pursuant to this Chapter, amendments to a development agreement shall be
approved by ordinance of the City Council and following a public hearing and
recommendation by the Planning Commission regarding the elements of the project that
fall within the purview of the Planning Commission. The Planning Commission shall
consider that the proposed agreement is consistent with the general plan and MMC
Chapter 15.40.
The proposed revisions to the CPD zone proposed by the First Amendment of the
Development Agreement would include additional uses including: motion
picture/television production, laboratory or research, manufacturing and assembly uses,
or warehousing that could locate on the subject parcel, subject to a Conditional use Permit
as noted in Table 17.20.060 of the MMC. The Development Agreement remains active
until its expiration on October 21, 2025.
Honorable Planning Commission
ZOA No. 2021-02 and DAA No. 2004-02
11/23/2021 Regular Meeting
Page 7
PROCESSING TIME LIMITS
Time limits have been established for the processing of development projects under the
Permit Streamlining Act (Government Code Title 7, Division 1, Chapter 4.5), the
Subdivision Map Act (Government Code Title 7, Division 2), and the California
Environmental Quality Act Statutes and Guidelines (Public Resources Code Division 13,
and California Code of Regulations, Title 14, Chapter 3). However, because the subject
application includes legislative actions to amend the Zoning Ordinance and an
amendment to a Development Agreement, it is not subject to the provisions of the Permit
Streamlining Act.
ENVIRONMENTAL DETERMINATION
In accordance with the CEQA an Initial Study / Negative Declaration (IS/ND) (Attachment
1, Exhibit A) was prepared that determined that the project would not have a significant
effect on the environment. The IS/ND was circulated for public comment between October
20, 2021, to November 19, 2021. Although comment letters were received from various
agencies, all letters received indicated no comment or concern with the IS/ND, therefore
no changes to the IS/ND have been proposed at this time.
NOTICING
Public Notice for this meeting was given consistent with Chapter 17.44.070 of the Zoning
Ordinance as follows:
1. Publication. The notice of the public hearing was published in the Ventura County
Star on November 13, 2021.
2. Mailing. The notice of the public hearing was mailed on November 12, 2021, to
owners of real property, as identified on the latest adjusted Ventura County Tax
Assessor Roles, within 1,000 feet of the exterior boundaries of the assessor's
parcel(s) subject to the hearing.
3. Sign. One 32 square -foot sign was placed on the street frontage on November 12,
2021.
ATTACHMENTS
Attachment 1: Draft Resolution No. PC -2021-665
Exhibit A: Draft Initial Study and Negative Declaration
Exhibit B: Draft Zoning Ordinance Amendment No. 2021-02
Exhibit C: Draft First Amendment to Development
Agreement between City of Moorpark and NLA 118, LLC
Attachment 2: Development Agreement No. 2004-02
RESOLUTION NO. PC -2021-665
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF MOORPARK, CALIFORNIA, RECOMMENDING THAT THE CITY
COUNCIL APPROVE ZONING ORDINANCE AMENDMENT NO.
2021-02 AMENDING CHAPTERS 17.08 (DEFINITIONS) AND 7.20
(USES BY ZONE) OF TITLE 17 (ZONING) OF THE MOORPARK
MUNICIPAL CODE TO ADD CERTAIN USES TO THE COMMERCIAL
PLANNED DEVELOPMENT ZONE AT 14349 WHITE SAGE ROAD
SUBJECT TO A CONDITIONAL USE PERMIT, APPROVE THE FIRST
AMENDMENT TO DEVELOPMENT AGREEMENT 2004-02, AND
ADOPT A NEGATIVE DELCARATION PURSUANT TO THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION
THEREWITH, ON THE APPLICATION OF THOMAS SCHLENDER,
ON BEHALF OF LLA 118, LLC.
WHEREAS, on December 21, 2005, the City of Moorpark entered into
Development Agreement (DA) No. 2004-02 with NLA 118, LLC for the construction and
operation of an appliance retailer and distribution warehouse, located at 14349 White
Sage Road; and
WHEREAS, on May 4, 2020, Thomas Schlender, on behalf of LLA 118, LLC
submitted an application for the First Amendment to DA No. 2004-02 and Zoning
Ordinance Amendment (ZOA) No. 2021-02 to expand the potential uses that mat be
conducted within the Commercial Planned Development (CPD) zone at 14349 White
Sage Road; and
WHEREAS, at the duly noticed public hearing on November 23, 2021, the Planning
Commission considered ZOA No. 2021-02 and the First Amendment to DA No. 2004-02,
the agenda report and any supplements thereto and written public comments; opened the
public hearing and took and considered public testimony both for and against the
proposal, closed the public hearing, and discussed and reached a decision on this matter;
and
WHEREAS, the Planning Commission has also read, reviewed, and considered
the Initial Study and proposed Negative Declaration prepared pursuant to the California
Environmental Quality Act (CEQA) for the project.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
MOORPARK, DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. ENVIRONMENTAL DETERMINATION: The Planning Commission
recommends that the City Council determine that the Initial Study and Negative
Declaration as shown in Exhibit A has been prepared pursuant to CEQA provides a
PC Attachment 1
Resolution No. PC -2021-665
Page 2
complete and accurate analysis that indicates that the project will not result in any
significant impacts on the environment and adopt the Initial Study/Negative Declaration.
SECTION 2. FIRST AMENDMENT TO DEVELOPMENT AGREEMENT
FINDINGS: Based upon the information set forth in the staff report, accompanying
studies, and oral and written public testimony, the Planning Commission makes the
following findings in accordance with City of Moorpark Municipal Code Section 15.40.100:
A. The provisions of the First Amendment to the DA are consistent with the General
Plan in that it will help achieve the goals of the Land Use Element and is consistent
with the goals and policies of all other elements.
B. The provisions of the DA and the assurances that said agreement places upon the
project are consistent with the provisions of Chapter 15.40 of the Moorpark
Municipal Code because the DA contains the elements required by Section
15.40.030 and shall be processed through a duly -noticed public hearing process
as required by law.
SECTION 3. PLANNING COMMISSION RECOMMENDATION: The Planning
Commission recommends to the City Council approval of Zoning Ordinance Amendment
No. 2021-02 as shown in Exhibit B, approval of the First Amendment to DA No. 2004-02
as shown in Exhibit C, and adoption of the Initial Study/Negative Declaration associated
therewith, attached hereto as Exhibit A.
SECTION 4. Filing of Resolution: The Community Development Director shall
cause a certified resolution to be filed in the book of original resolutions.
Resolution No. PC -2021-665
Page 3
The action of the foregoing direction was approved by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
PASSED, AND ADOPTED this 23rd day of November, 2021.
Kipp Landis
Chair
Carlene Saxton
Community Development Director
Exhibit A — Draft Initial Study and Negative Declaration
Exhibit B — Draft Zoning Ordinance Amendment No. 2021-02
Exhibit C — Draft First Amendment to Development Agreement No. 2004-02 between
City of Moorpark and NLA 118, LLC
W,
Resolution No. PC -2021-665
Page 4
EXHIBIT A
DRAFT INITIAL STUDY and NEGATIVE DECLARATION
Resolution No. PC -2021-665
Page 5
INITIAL STUDY/ NEGATIVE
DECLARATION FOR THE
WAREHOUSE DISCOUNT CENTER
PROJECT MOORPARK, CALIFORNIA
Prepared for:
CITY OF MOORPARK
799 Moorpark Avenue
Moorpark, California 93021
Prepared by:
CHAMBERS GROUP, INC.
600 West Broadway, Suite 250
Glendale, California 91204
September 2021
12
Initial Study for the Warehouse Discount Center
Project
TABLE OF CONTENTS
Page
SECTION 1.0 — PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING
..................................................5
1.1 PROJECT PURPOSE AND BACKGROUND INFORMATION
5
1.2 PROJECT LOCATION AND SITE CHARACTERISTICS
5
1.2.1 Location.........................................................................................................................5
20
1.2.2 Site Access and Circulation.............................................................................................5
4.3
1.2.3 General Plan Designation/Zoning...................................................................................5
22
1.2.4 Documents Incorporated by Reference.......................................................................11
4.4
1.3 PROJECT DESCRIPTION
11
1.3.1 Permits and Agreements..............................................................................................12
4.5
SECTION 2.0—ENVIRONMENTAL DETERMINATION................................................................................16
2.1 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: 16
2.2 DETERMINATION 16
SECTION 3.0 — EVALUATION OF ENVIRONMENTAL IMPACTS.................................................................17
SECTION 4.0 — CHECKLIST OF ENVIRONMENTAL ISSUES..
4.1
AESTHETICS
19
4.1.1 Impact Analysis ..................................
4.2
AGRICULTURE & FORESTRY RESOURCES
20
4.2.1 Impact Analysis ..................................
4.3
AIR QUALITY
22
4.3.1 Impact Analysis ..................................
4.4
BIOLOGICAL RESOURCES
23
4.4.1 Impact Analysis ..................................
4.5
CULTURAL RESOURCES
25
4.5.1 Impact Analysis ..................................
4.6
ENERGY
.......................................................................19
4.6.1 Impact Analysis............................................................................................................26
19
.......................................................................19
27
20
.......................................................................
21
GREENHOUSE GAS EMISSIONS
22
.......................................................................
22
23
.......................................................................
24
25
.......................................................................
25
HYDROLOGY AND WATER QUALITY
26
Chambers Group; Inc
13
4.6.1 Impact Analysis............................................................................................................26
4.7
GEOLOGY AND SOILS
27
4.7.1 Impact Analysis............................................................................................................28
4.8
GREENHOUSE GAS EMISSIONS
30
4.8.1 Impact Analysis............................................................................................................30
4.9
HAZARDS AND HAZARDOUS MATERIALS
31
4.9.1 Impact Analysis............................................................................................................31
4.10
HYDROLOGY AND WATER QUALITY
33
4.10.1 Impact Analysis............................................................................................................34
4.11
NOISE
36
4.11.1 Impact Analysis............................................................................................................36
Chambers Group; Inc
13
Initial Study fbr- the Warehouse Discount Center
Project
4.12
LAND USE AND PLANNING
37
4.12.1 Impact Analysis............................................................................................................37
4.13
MINERAL RESOURCES
38
4.13.1 Impact Analysis............................................................................................................39
4.14
POPULATION AND HOUSING
39
4.14.1 Impact Analysis............................................................................................................39
4.15
PUBLIC SERVICES
40
4.15.1 Impact Analysis............................................................................................................40
4.16
RECREATION
41
4.16.1 Impact Analysis............................................................................................................41
4.17
TRANSPORTATION
42
4.17.1 Impact Analysis............................................................................................................42
4.18
TRIBAL CULTURAL RESOURCES
43
4.18.1 Impact Analysis............................................................................................................44
4.19
UTILITIES AND SERVICE SYSTEMS
44
4.19.1 Impact Analysis............................................................................................................45
4.20
WILDFIRE
46
4.20.1 Impact Analysis............................................................................................................46
4.21
MANDATORY FINDINGS OF SIGNIFICANCE
47
4.21.1 Impact Analysis............................................................................................................48
SECTION5.0 — REFERENCES.....................................................................................................................50
(hambers Group, Inc.
14
Figure 1: Project Vicinity Map
Figure 2: Project Location .....
Figure 3: Existing Zoning .......
Table 1: Allowable Uses
Initial Study for the Warehouse Discount Center
Project
LIST OF FIGURES
.....................................
LIST OF TABLES
..................................................13
..................................................14
..................................................15
...............................................6
Chambers Group, [no. iv
15
Initial Study for the Warehouse Discount Center
Proiect
SECTION 1.0—PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING
1.1 PROJECT PURPOSE AND BACKGROUND INFORMATION
DAUM Commercial Real Estate Services (DAUM; Applicant) requests to amend Chapter 17 (Zoning) of the
Moorpark Municipal Code and an existing development agreement for the property located at 14349 White
Sage Road (Project, Proposed Project, Subject Property) in Moorpark (City), Ventura County (County),
California. The amendments would allow for additional uses on the subject property with approval of a
Conditional Use Permit, including laboratories, manufacturing and assembly, film production, and
warehousing. The subject property is zoned Commercial Planned Development (CPD) and consists of a
100,000 square -foot building that includes a 15,000 square -foot retail showroom and 85,000 square -foot
warehouse/distribution facility (Warehouse Discount Center). No development is proposed with this
request.
The City is the lead agency for the Proposed Project. This Initial Study has been prepared in accordance with
CEQA (Public Resources Code §21000 et seq.) and the State CEQA Guidelines (Title 14, California Code of
Regulations, §15000 et seq.) and has determined that preparation of an Initial Study with a Negative
Declaration would be appropriate under CEQA.
1.2 PROJECT LOCATION AND SITE CHARACTERISTICS
1.2.1 Location
The Project site includes one developed property with existing buildings and landscaped parking lot spaces.
The Project site is located north of White Sage Road, east of the Ronald Reagan Freeway/State Route 118
(SR -118), west of open space and the Arroyo Simi creek, and south of an east/west railroad line. All other
properties immediately west of SR -118 and south of White Sage Road consist of various businesses
comprising commercial, industrial, and hotel buildings.
1.2.2 Site Access and Circulation
The main access to the site is through White Sage Road, which is connected to New Los Angeles Avenue.
New Los Angeles Avenue and White Sage Road are accessible from the SR -118 off -ramp. Both customers
and delivery trucks access the Project site from one driveway along White Sage Road. The driveway extends
to the north of the Project site where delivery vans and trucks are parked. The New Los Angeles Avenue on -
and off -ramps are located immediately south of the Project site.
1.2.3 General Plan Designation/Zoning
The City's General Plan Land Use designation of the subject property is C-2 General Commercial. The Zoning
Map designates the Project site as Commercial Planned Development (CPD) (City 2020b). The usesfor CPD
properties include retail and service uses, eating and drinking places, office and professional uses,
manufacturing, public and semipublic uses, and accessory and miscellaneous uses as stated in Chapter
17.20 of the City's Municipal Code (City 2020a) and listed below in Table 1.
Chambers Group, [tic.
16
Initial Study jor the Warehouse Discount Center
Project
Table 1: Allowable Uses
A. Retail and Service Uses
1. Adult businesses when in compliance with Sections 17.24.040(N), 17.78.050
and Chapter 5.18
2. Alcoholic beverage sales for off-site consumption when in conjunction with another
city -approved retail or service use other than automobile servicestation or liquor store
a. Beer and/or wine (*if within one hundred [100] feet of a residentially zoned
property a conditional use permit is required)
AP*
b. Beer, wine and other alcoholic beverages
CUP
3. Automobile/light truck/motorcycle
a. Brakes, oil changes, tires and shock sales and installation, tune- ups and other light
service and repair (with or without hydraulic lifts) (*if within one hundred [100] feet of a
residentially zoned property a conditional use
permit is required)
AP*
b. Car washes, self-service or automatic with or without automotive services
stations
CUP
C. Engine rebuilding, transmission repair, steam cleaning, auto body, painting
d. Parts and supplies
ZC
e. Rental
AP
f. Sales, with or without service and parts
CUP
g. Service stations with or without mini -marts and with or without beer and
wine sales for off-site consumption
CUP
4. Body piercing and/or tattoo
CUP
5. Building supplies (*if within one hundred [100] feet of a residentially zoned
property a conditional use permit is required)
AP*
6. Hay and feed sales
7. Hotels, motels and bed and breakfast inns when in compliance with Chapter
5.44
CUP
8. Kennels and catteries
9. Liquor stores (when located no closer than one thousand [1,000] feet of any
other liquor store or public or private school)
CUP
10. Commercial cannabis activity
11. Nurseries (retail) with or without container grown plants when all equipmentand
supplies kept in an enclosed area
AP
12. Nurseries (wholesale and/or retail) with or without container grown plants
when all equipment and supplies kept in an enclosed area
13. Pawnshops when in compliance with Chapter 5.32
AP
14. Pest control services (*if within 100 feet of a residentially zoned property a
conditional use permit is required)
15. Private post offices, parcel services, copy centers
ZC
16. Psychics, fortunetelling, and spiritual advisors when in compliance with Title 5 of the
Moorpark Municipal Code (*if within 100 feet of a residentially zoned property a
conditional use permit is required)
AP*
Chaulbers Group, [nc. 6
17
Inihal Study for the Warehouse Discount Center
Proiect
Table 1: Allowable Uses
Zones
CPD (Community
Planned
Development)
17. Recreational vehicle storage yards when not located on parcels adjacent to
arterial roads or freeways as shown on the Moorpark Circulation Element
Highway Network Map and with or without a caretaker dwelling
18. Recycling centers
CUP
19. Recycling drop-off bins when located in an area determined by the community
ZC
development director not to be in conflict with parking, vehicle or pedestrian
circulation
20. Rental and leasing of large equipment with or without outdoor storage and repair (*if
within one hundred [1001 feet of a residentially zoned property a conditional use permit
is required)
21. Retail shops and personal service establishments, except as otherwise indicated in this
ZC
table, including, but not limited to, antiques, art and craft dealers and supplies, bakeries,
barbers, beauty salons, bicycle sales/service, books and stationery, camera/photo stores
including on-site processing, carpet and flooring sales/ cleaning/installation, clothing and
fabric stores, computer sales and service, department and variety stores, dry cleaners,
electronic equipment sales and service, florists, food markets, gift and novelty stores, key
and locksmiths, music stores (including recorded music and musical instrument sales,
service, and lessons), newsstands, paint stores, party supply sales and rental, pet
grooming, petsales and supplies, pharmacies, photography studios, pool and spa sales and
supplies, shoe stores, sporting goods and equestrian supplies, small equipment rental (no
outdoor storage), toy and hobby stores, video/DVD/CD sales and rental, wireless
sales/service, and uses which the community development director determines to be
similar when in compliance
with Section 17.20.030
22. Retail sales combined with limited distribution and/or warehousing not exceeding
AP*
40% of gross floor area of the building in which it is located (*if within
100 feet of a residentially zoned property a conditional use permit is required)
23. Retail sales in the M-1 and M-2 zone limited to a maximum of 20% of the grossfloor
area of the building in which it is located. In an industrial complex the 20% shall be
computed on the basis of the cumulative total floor area of the
industrial planned development (IPD)
24. Retail sales (temporary) in the M-1 and M-2 zones. Issuance of a temporary usepermit
shall take the place of a zoning clearance
25. Thrift stores, secondhand shops, consignment stores when in compliance with
AP
Chapter 5.32
26. Tobacco sales
a. Retail smoking products stores, as defined in Chapter 8.32
CUP
b. Sale of tobacco products and electronic cigarette (vaping) products from retail
AP
establishments other than retail smoking products stores
C. Smoking and vaping lounges where tobacco and vaping products are sold for
on-site consumption (e.g., cigar lounges, hookah lounges, vaping lounges) other
than retail smoking products stores
B. Eating and Drinking Places
1. Bars with or without entertainment including, but not limited to, cocktail
CUP
lounges, cabarets.
Chambers Group, Inc.
18
Initial Study for the Warehouse Discount Center
Project
Table 1: Allowable Uses
Chambers Group, Inc.
19
PD
Zones
Planned
Development)
2. Breweries, microbreweries, wineries/tasting rooms with or without restaurant
CUP
and with or without outdoor seating and with or without entertainment
3. Restaurants and similar establishments engaged primarily in the retail sale of prepared
food for on-site or off-site consumption in accordance with therestrictions below:
a. With or without entertainment and with or without on-site consumption of beer and
AP*
wine and other alcoholic beverages and with or without outdoor seating (*if within 100
feet of a residentially zoned property a conditional use
permit is required)
b. With drive-in or drive-through facilities (sale of alcoholic beverages
CUP
from the drive-in or drive-through facilities is prohibited) with or without outdoor
seating (Only permitted in the CPD Zone)
C. Office and Professional Uses
1. Financial services
a. Banks and other financial institutions, except those set forth below
ZC
b. Check cashing, payday loan, and vehicle title loan establishments (Only
AP
permitted in CPD Zone)
C. Automated/automatic teller machines (ATMs)
ZC
2. Laboratories: research and scientific
3. Professional and administrative offices, including, but not limited to: accounting,
ZC
advertising agencies, chiropractic, collection services; dental, direct mail marketing
companies, employment agencies, engineering services, insurance, investment; medical,
optical and related health services; planning services, real estate services; secretarial
services, travel agencies, and uses which the community development director
determines to be similar when in
compliance with Section 17.20.030
4. Veterinary offices and animal hospitals
a. Without boarding (keeping of animals indoors and on-sitefor medical purposes
AP
shall not be considered boarding)
b. With boarding indoors or outdoors
CUP
5. Massage establishments when in compliance with Chapter 5.48 of the
Moorpark Municipal Code
a. Massage establishments with 4 or more massage stations, or where 20% or more of
CUP
the floor area is dedicated to massage services (Only permitted in the CPD Zone)
b. Massage establishments at day spas, salons, or similar uses with 3 or fewer
ZC
massage stations, provided that less than 20% of the floor area is dedicated to
massage services
D. Manufacturing, Assembly, Distribution, and Warehousing Uses Cement,concrete and
plaster, and product fabrication
1. Cement, concrete and plaster, and product fabrication
2. Distribution and transportation facilities
3. Heavy machinery repair, including trucks, tractors and buses
Chambers Group, Inc.
19
Initial Study for the Wurehouse Discount Center
Project
Table 1: Allowable Uses
Zones
(Community
Development)CPD
Planned
4. Manufacturing and assembly including, but not limited to, appliances, cabinets,
cleaners, clothing, computers, cosmetics, detergents, electronics, furniture, leather
products, machinery, medical and scientific instruments, paper, perfumes,
pharmaceuticals, photographic and optical goods, plastic products, signs and advertising
displays, soap, textiles and other uses which the community development director
determines to be similar when in compliance
with Section 17.20.030 (*if within 100 feet of a residentially zoned property an
administrative permit is required)
5. Outdoor storage when in conjunction with a city approved use and when all storage is
CUP
screened by an 8 -foot -high masonry wall architecturally matched to the structure (*if
with in 100 feet of a residentially zoned property a conditional
use permit is required)
6. Self -storage or mini storage when not located on parcels adjacent to arterial
roads or freeways as shown on the Moorpark Circulation Element Highway
Network Map and with or without a caretaker dwelling
7. Warehousing
8. Welding
E. Public and Semi -Public Uses
1. Amusement and recreational facilities as defined in Chapter 17.08
a. Arcades (video and computer) and cyber cafes
CUP
b. Health clubs, gymnasiums, fitness centers, and fitness studios for uses such as
martial arts, yoga, dance, and other similar uses or combination of uses
i. up to 3,000 square feet
AP
ii. over 3,000 square feet (*if within 100 feet of a residentially
AP*
zonedproperty a conditional use permit is required)
C. Auditoriums, community centers, dancehalls, and indoor motion picture
CUP
theaters
d. Billiard and pool establishments, and bowling alleys, with or without alcohol
CUP
2. Care facilities, including adult day care facilities, Alzheimer's day care facilities,
CUP
congregate living health facilities, child day care centers, community treatmentfacilities,
foster family and adoption agencies, hospices, long-term health care facilities, residential
care facilities for the elderly, residential care facilities for persons with chronic life-
threatening illness, skilled nursing and intermediate
care facilities, social rehabilitation facilities, and therapeutic day services facilities
3. Emergency shelters in compliance with the requirements of Chapter 17.28
ZC*
(*allowed in C-2 zone only, not permitted in CPD zone; emergency shelters are
also allowed in conjunction with permitted places of religious assembly)
4. Single room occupancy unit development in compliance with the requirements
ZC*
of Chapter 17.28 (*allowed in C-2 zone only, not permitted in CPD zone)
5. Clubhouses, social clubs, service clubs with or without alcohol
6. Energy production from renewable resources
7. Governmental uses including, but not limited to, city offices, community rooms,fire
CUP
stations, human service centers, libraries, police stations, public utility facilities
8. Hospitals including urgent care (*if within one hundred [100] feet of a
AP*
residentially zoned property a conditional use permit is required)
Chambers Group, Inc.
20
Initial Study far the Warehouse Discount Cerate;
Project
Table 1: Allowable Uses
[Blank] = Not permitted
AP = Administrative Permit
CUP= Conditional Use Permit
NZC = No Zoning Clearance Required
TUP =Temporary Use Permit
ZC = Permitted by Zoning Clearance
Chambers Group, [nc. I ()
21
P.
Development)Zone Planned
9. Places of religious assembly, with or without schools and/or social services,
including emergency shelters
i. up to 3,000 square feet
AP
iii. over 3,000 square feet (*if within 100 feet of a residentially zoned
AP*
propertya conditional use permit is required)
10. Private education facilities including, but not limited to, colleges and
universities, elementary, middle and high schools
11. Private training facilities including, but not limited to, professional and vocational
AP*
schools, art and craft schools, music schools not part of a music store, and driver training
schools (*if within 100 feet of a residentially zoned property a conditional use permit is
required)
12. Recreational facilities (private), indoor or outdoor, with or without food services,
AP*
including, but not limited to, batting cages, bicycle and skate facilities, golf courses
(including miniature golf and driving ranges), and sports fields. Bicycles and skate parks
shall be in compliance with Chapter 17.28 (*if within
100 feet of a residentially zoned property a conditional use permit is required)
13. Utility structures (electrical boxes, transformers and valve apparatus that have no
AP
covered floor area and are attached to the ground by poles, columns or pedestals shall
not require a zone clearance)
14. Wireless communications facilities, in accordance with therequirements of
Chapter 17.42
a. Major wireless communications facilities
CUP
b. Minor wireless communications facilities
AP
C. Collocation wireless communications facilities (consistent with definition
ZC
of "collocation facility" in Section 17.42.020)
F. Accessory and Miscellaneous Uses
1. Outdoor sales
CUP
2. Retail shops and services as listed in Table 17.20.060(A)(21) when the uses are
determined by the community development director to be ancillary to office use of the
property
3. Temporary motion picture, television, or still photography production (and
TUP
related activities and structures) in accordance with Section 17.28.120
4. Temporary uses including, but not limited to, carnivals, Christmas tree sales, circuses,
TUP
festivals, sidewalk sales, special events, outdoor sales, when in compliance with Chapter 17.44.
Issuance of a temporary use permit shall take the place of azoning clearance. Temporary uses
lasting more than 180 days require an AP
5. Drive-through facilities associated with permitted uses in the zone other than
CUP
eating and drinking places (Not allowed in C-2 Zone)
[Blank] = Not permitted
AP = Administrative Permit
CUP= Conditional Use Permit
NZC = No Zoning Clearance Required
TUP =Temporary Use Permit
ZC = Permitted by Zoning Clearance
Chambers Group, [nc. I ()
21
Initial Stlidy,for the Warehouse Discount Center
Project
1.2.4 Documents Incorporated by Reference
In August 1996, the City prepared an Environmental Impact Report analyzing the Manufacturing Plan
Facilities and Commercial Development Plan (1996 Plan) proposed by Special Devices Incorporated for new
consolidated manufacturing facilities within the City. Special Devices Incorporated proposed the
development of manufacturing and commercial facilities, which were not able to be accomplished under
the zoning and land use designations at that time. Therefore, the proposed development required an
amendment to the General Plan as well as a Zoning Designation change. The 1996 Plan included a General
Plan Amendment, Zone Change, Vesting Tentative Map, Industrial Planned Development, and Development
Agreement for the proposed development. The 1996 Plan and associated EIR will be incorporated by
reference in the Initial Study for the Proposed Project to identify any consistencies or inconsistencies with
the City's General Plan and will be used to identify analyses that have been previously conducted for the
Project site.
1.3 PROJECT DESCRIPTION
The Project requests to expand the existing uses outlined in the Development Agreement to allow the siteto
be made available for additional use types. This would require amending the zoning code to allow expanded
uses atthe Project site by including additional allowable uses with an approved Conditional UsePermit similar
to the uses under the Industrial Park (M-1) zoning designation. The additional allowable uses in the
proposed amended zone language are as follows:
4.1.a. Laboratories: research and scientific, upon the grant of a conditional use permit.
4.1.b. Manufacturing and assembly including, but not limited to, appliances, cabinets, cleaners,
clothing, computers, cosmetics, detergents, electronics, furniture, leather products,
machinery, medical and scientific instruments, paper, perfumes, pharmaceuticals,
photographic and optical goods, plastic products, signs and advertising displays, soap, textiles
and other uses which the community development director determines to be similar when in
compliance with Section 17.20.030, upon the grant of a conditional use permit.
4.1.c. Motion picture, television, or still photography production (and related activities and structures)
in accordance with Section 12.28.120, upon the grant of a conditional use permit.
4.1.d. Warehousing, with at least 10 percent of the floor area of the building dedicated to retail uses
upon the grant of a conditional use permit.
The proposed new definitions for Chapter 17.08.010 are as follows:
"Motion picture and television production studio" shall mean a fixed place of business where filming
activities (motion or still photography) are regularly conducted upon the premises.
"Photography Studio" shall mean a fixed place of business where still photography activities are regularlyconducted
upon the premises.
The revised zoning code would introduce new uses that could be conditionally permitted within the CPD
zone on project sites meeting the following conditions:
Chambers Group, Inc. 1 t
22
Initial Study jbr the Warehouse Discount Center
Project
1. Sites greater than eight acres that are adjacent to both a freeway interchange and an arterial
roadway as identified in the circulation element and that are not adjacent to planned residential
uses.
2. With at least 10% of the floor area of the building dedicated to retail uses. Warehousing uses that
will create a point-of-sale allocation to the City of Moorpark and provide evidence of generating
more than ten million dollars ($10,000,000) in annual sales may dedicate less than 10% of the
floor area to retail uses.
The subject project site is the only property within the City of Moorpark that meets Condition #1. The
revised zoning code would not create a development or change the use to any individual property within
the CPD zone. The implementation of the revised zoning code and all new uses would require the
preparation of a Conditional Use Permit, separate CEQA analysis and a public hearing. The Project will not
include anyground disturbance or physical alteration of the Project site or the existing building at this time.
Current operations will remain.
1.3.1 Permits and Agreements
As required by the California Environmental Quality Act (CEQA) Guidelines, this section provides, to the
extent the information is known, a list of permits and other approvals required to implement the Project.
The following discretionary approvals are required for the Project:
Development Agreement Amendment
Zoning Ordinance Amendment
Chambers Group, inc.
23
Initial Study for- the Warehouse Discount Centz�
Project
Figure 1: Project Vicinity Map
9 Y
Kern
Obispo
San
Bernardino
„�a e
-{� ��°Mfg f�•a g - c9
� _ 0 6mpus Park D
>�•"-r�� ;T'S � 1. Ain trnf str :r StaAord 51 � y^ h f y.
ntit o — a.�.T ?
- ^a H tfc-st y!
q ReaOaP Fwry—
Roro
v Ett`mre 4' N`C • i ,pnu ,1i' �
,. est � rotM nom" Ii
i3rd S�rall r n `1 ;�.- qC1 ^. �I
ShrmsnA � ..
4-0
• 1 °i r !i •GranA letaYDr 't`�+ .t �+k lfl^
6 Or %t� ,� � q+ Tfeire:�ReJpne�Rd� �
Ulama rsttR -N`��i s$' it ,.
s
eti , un �r AY.
=1 Project Location Figure 1
Warehouse Discount
Project
1 750 1,500 3,000
CHAMOIRS
Feet GAMP
Chambers Group, [nc. 13
24
huhal Study for the Warehouse Discount Ce771e1r
Project
Figure 2: Project Location
Chambers Group, Inc. 14
25
Initial Study for the Warehouse Discount Center
Project
Figure 3: Existing Zoning
Chambers Group, Inc. l
26
Initial .Study for the Warehouse Discount Center
Project
SECTION 2.0 — ENVIRONMENTAL DETERMINATION
2.1 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environmental factors checked below would potentially be affected by this project, involving at least
one impact that is a "Potentially Significant Impact," as indicated by the checklists on the following pages.
For each of the potentially affected factors, mitigation measures are recommended that would reduce the
impacts to less than significant levels.
❑
Aesthetics
❑ Agriculture and Forestry Resources
❑ Air Quality
❑
Biological Resources
❑ Cultural Resources
❑ Energy
❑
Geology /Soils
❑ Greenhouse Gas Emissions
❑ Hazards & Hazardous Materials
❑
Hydrology /Water Quality
❑ Land Use/ Planning
❑ Mineral Resources
❑
Noise
❑ Population/Housing
❑ Public Services
❑
Recreation
❑ Transportation
❑ Tribal Cultural Resources
❑
Utilities /Service Systems
❑ Wildfire
❑ Mandatory Findings of Significance
2.2 DETERMINATION
On the basis of this initial evaluation:
1. 1 find that the project could not have a significant effect on the environment, and a
g
NEGATIVE DECLARATION will be prepared.
2. 1 find that although the proposed project could have a significant effect on the
❑
environment, there will not be a significant effect in this case because revisions in the
project have been made by or agreed to by the project proponent. A MITIGATED
NEGATIVE DECLARATION will be prepared.
3. 1 find the proposed project may have a significant effect on the environment, and an
❑
ENVIRONMENTAL IMPACT REPORT is required.
4. 1 find that the proposed project may have a "potentially significant impact" or
❑
"potentially significant unless mitigated impact" on the environment, but at least one
effect (1) has been adequately analyzed in an earlier document pursuantto applicable legal
standards, and (2) has been addressed by mitigation measures based on the earlieranalysis
as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it
must analyze only the effects that remain to be addressed.
5. 1 find that although the proposed project could have a significant effect on the
❑
environment, because all potentially significant effects (a) have been analyzed adequately
in an earlier EIR or Negative Declaration pursuant to applicable standards, and (b) have
been avoided or mitigated pursuant to that earlier EIR or Negative Declaration, including
revisions or mitigation measures that are imposed upon the
proposed project, nothing further is required.
�I
September 2 2021
Signature Date
Douglas Spondello, AICP Interim Community Development Director
Name Title
Chambers Group, Inc.
16
27
Initial Study for the Warehouse Discount Center
Project
SECTION 3.0 — EVALUATION OF ENVIRONMENTAL IMPACTS
1. A brief explanation is required for all answers except "No Impact" answers that are adequately
supported by the information sources a lead agency cites. A "No Impact" answer is adequately
supported if the referenced information sources show that the impact simply does not apply to
projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact"
answer should be explained where it is based on project -specific factors as well as general standards
(e.g., the project will not expose sensitive receptors to pollutants, based on a project -specific
screening analysis).
2. All answers must take account of the whole action involved, including offsite as well as onsite,
cumulative as well as project -level, indirect as well as direct, and construction as well as operational
impacts.
3. Once the lead agency has determined that a particular physical impact may occur, then the checklist
answers must indicate whether the impact is potentially significant, less than significant with
mitigation, or less than significant. "Potentially Significant Impact" is appropriate if substantial
evidence exists that an effect may be significant. If one or more "Potentially Significant Impact" entries
are marked when the determination is made, an Environmental Impact Report (EIR) is required.
4. "Negative Declaration: Less Than Significant with Mitigation Incorporated" applies where the
incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a
"Less Than Significant Impact." The lead agency must describe the mitigation measures and briefly
explain how they reduce the effect to a less than significant level (mitigation measures from earlier
analyses may be cross-referenced).
5. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an
effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D).
In this case, a brief discussion should identify the following:
a. Earlier Analysis Used. Identify and state where they are available for review.
b. Impacts Adequately Addressed. Identify which effects from the above checklist were within the
scope of and adequately analyzed in an earlier document pursuant to applicable legal standards,
and state whether such effects were addressed by mitigation measures based on the earlier
analysis.
c. Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures
Incorporated," describe the mitigation measures which were incorporated or refined from the
earlier document and the extent to which they address site-specific conditions for the project.
6. Lead agencies are encouraged to incorporate into the checklist references to information sources for
potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or
outside document should, where appropriate, include a reference to the page or pages where the
statement is substantiated.
7. Supporting Information Sources: A source list should be attached, and other sources used or
individuals contacted should be cited in the discussion.
Chambers Group, Inc. 17
28
Initial Study for the Warehouse Discount Center
Project
8. The explanation of each issue should identify:
a. the significance criteria or threshold, if any, used to evaluate each question; and
b. the mitigation measure identified, if any, to reduce the impact to less than significant.
*Note: Instructions may be omitted from final document.
Chambers Group, Inc I S
29
Initial Study for the Warehouse Discount Center
Project
SECTION 4.0— CHECKLIST OF ENVIRONMENTAL ISSUES
4.1 AESTHETICS
4.1.1 Impact Analysis
a) Would the project have a substantial adverse effect on a scenic vista?
No Impact. The Project site is located in the vicinity of a number of City -designated scenic corridors,
including the Arroyo Simi creek, Los Angeles Avenue, Tierra Rejada Road, and State Route 23 (SR -23,
Moorpark Freeway) (City 1986). However, the Project involves zoning code and development agreement
amendments to allow additional conditionally permitted uses on the Project site, which iszoned CPD.
Implementation ofthe amended zoning code could result in changes to the Project site inthe future, but the
current Project will not include any ground disturbance or physical alteration of the existing building on site
at this time. Further, current operations at the Project site will remain. Any significant changes to the
physical appearance of the Project site or other CPD zones in the futurewould be evaluated on a case-by-
case basis. However, the current Project would not have adverse effects on a scenic vista; and no impacts
would occur.
b) Would the project substantially damage scenic resources, including, but not limited to, trees, rock
outcroppings, and historic buildings within a state scenic highway?
No Impact. The Project is not located within a state scenic highway, and no officially designated statescenic
highways are in the vicinity of the Project site (Caltrans 2019). The Project involves zoning codeand
development agreement amendments to allow additionally conditionally permitted uses on the Project
site. Implementation of the amended zoning code could result in changes to the Project site in the future,
but the current Project will not include any ground disturbance or physical alteration ofthe existing building
on site. Additionally, current operations at the Project site will remain. Thus, no trees, rocks, outcroppings,
or historic buildings would be damaged as a result of the Project; and no impacts to scenic resources within
a state scenic highway would occur.
Chambers Group, Inc. I
30
Less than
AESTHETICS.
Potentially
Significant
Less Than
1.
Except as provided in Public Resources Code
Significant
with
Significant
No
Section 21099, would the project:
Impact
Mitigation
Impact
Impact
Impact
Incorporated
(a)
Have a substantial adverse effect on a scenic vista?
(b)
Substantially damage scenic resources, including,but
not limited to, trees, rock outcroppings, and
❑
❑
historic buildings within a state scenic highway?
(c)
In non -urbanized areas, substantially degrade the
existing visual character or quality of public views of
he site and its surroundings? (Public views are those
that are experienced from publicly accessible vantage
❑
❑
point). If the project is in an urbanized area,would the
project conflict with applicable zoning and
other regulations governing scenic quality?
(d)
Create a new source of substantial light or glarewhich
would adversely affect day or nighttime views
❑
❑
n the area?
4.1.1 Impact Analysis
a) Would the project have a substantial adverse effect on a scenic vista?
No Impact. The Project site is located in the vicinity of a number of City -designated scenic corridors,
including the Arroyo Simi creek, Los Angeles Avenue, Tierra Rejada Road, and State Route 23 (SR -23,
Moorpark Freeway) (City 1986). However, the Project involves zoning code and development agreement
amendments to allow additional conditionally permitted uses on the Project site, which iszoned CPD.
Implementation ofthe amended zoning code could result in changes to the Project site inthe future, but the
current Project will not include any ground disturbance or physical alteration of the existing building on site
at this time. Further, current operations at the Project site will remain. Any significant changes to the
physical appearance of the Project site or other CPD zones in the futurewould be evaluated on a case-by-
case basis. However, the current Project would not have adverse effects on a scenic vista; and no impacts
would occur.
b) Would the project substantially damage scenic resources, including, but not limited to, trees, rock
outcroppings, and historic buildings within a state scenic highway?
No Impact. The Project is not located within a state scenic highway, and no officially designated statescenic
highways are in the vicinity of the Project site (Caltrans 2019). The Project involves zoning codeand
development agreement amendments to allow additionally conditionally permitted uses on the Project
site. Implementation of the amended zoning code could result in changes to the Project site in the future,
but the current Project will not include any ground disturbance or physical alteration ofthe existing building
on site. Additionally, current operations at the Project site will remain. Thus, no trees, rocks, outcroppings,
or historic buildings would be damaged as a result of the Project; and no impacts to scenic resources within
a state scenic highway would occur.
Chambers Group, Inc. I
30
Initial Study jhr the Warehouse Discount (7enter
Project
c) Would the project, in non -urbanized areas, substantially degrade the existing visual character or
quality of public views of the site and its surroundings? (Public views are those that are experienced
from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict
with applicable zoning and other regulations governing scenic quality?
No Impact. The Project site is located within an urbanized area of the City visible from the City's Arroyo Simi
creek and Moorpark Freeway scenic corridors. Nonetheless, the Project involves zoning code and
development agreement amendments and will not include any ground disturbance or physicalalteration of
the existing building on site at this time. Further, current operations at the Project site will remain
unchanged. The existing development on site is consistent with all development and design standards
dictated by the City's zoning and land use regulations. Any changes to the physical appearance of the Project
site or other CPD zones in the future would be evaluated on a case-by-case basis. No impacts to the City's
visual character and public views would result from the current Proposed Project.
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views
in the area?
No Impact. The Project involves a zoning code amendment and will not include any ground disturbance or
physical alteration of the existing building on site at this time. Further, current operations at the Project site
will remain. Any future changes to the light sources on the Project site or within other CPD zones would be
evaluated on a case-by-case basis. Therefore, no new sources oflight or glare would be introduced as a
result of the Project; and no impacts would occur.
4.2 AGRICULTURE & FORESTRY RESOURCES
Chambers (croup, Inc. 20
IGN
AGRICULTURE & FOREST RESOURCES.
(In determining whether impacts to agricultural
resources are significant environmental effects, lead
agencies may refer to the California Agricultural
Land Evaluation and Site Assessment Model (1997)
prepared by the California Department of
Conservation as an optional model to use in
assessing impacts on agriculture and farmland. In
Less than
determining whether impacts to forest resources,
Potentially
Significant with
Less Than
2.
including timberland, are significant environmental
Significant
Mitigation
Significant
No
effects, lead agencies may refer to information
Impact
Incorporated
Impact
Impact
Impact
compiled by the California Department of Forestry
and Fire Protection regarding the state's inventory
of forestland, including the Forest and Range
Assessment Project and the Forest Legacy
Assessment project; and forest carbon
measurement methodology provided in Forest
Protocols adopted by the
California Air Resources Board. Would the project:
(a)
Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural
use?
Chambers (croup, Inc. 20
IGN
Initial Study for the Warehouse Diseourt Center
Prroject
(b)
Conflict with existing zoning for agricultural use, or a
Williamson Act contract?
(c)
Conflict with existing zoning for, or cause rezoning of,
forest land (as defined in Public Resources Code
section 12220(g)), timberland (as defined by Public
Resources Code section 4526), or timberland zoned
Timberland Production (as defined by Government
Code section 51104(g))?
(d)
Result in the loss of forest land or conversion of
.forest land to non -forest use?
(e)
Involve other changes in the existing environment
which, due to their location or nature, could result in
71
conversion of Farmland, to non-agricultural use or
he conversion of forest land to non -forest use?
4.2.1 Impact Analysis
a) Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring
Program of the California Resources Agency, to non-agricultural use?
No Impact. The City's Zoning Map designates the Project site as Commercial Planned Development (CPD)
(City 2020b). The uses for CPD properties include retail and service uses, eating and drinking places, office
and professional uses, manufacturing, public and semipublic uses, and accessory and miscellaneous uses as
stated in Chapter 17.20 of the City's Municipal Code. None of the allowable uses for the CPD zoning
designation involve agricultural activities. Additionally, according to the California Department of
Conservation's Important Farmland Finder, the Project site does not encompass Prime Farmland, Unique
Farmland, or Farmland of Statewide Importance (DOC 2021a). Thus, the Project would not convert farmland
to non-agricultural use; and no impacts would occur.
b) Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract?
No Impact. As mentioned above, the City's Zoning Map designates the Project site as CPD; and noneof the
allowable uses for this zoning designation involve agricultural activities (City 2020b). Moreover,a map of
agricultural preserves produced for the County's 2040 General Plan Update shows that no lands under
Williamson Act contracts are within the Project site (County 2020). The Project would notconflict with any
existing zones for agricultural use or a Williamson Act contract; therefore, no impactwould occur.
c) Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in
Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section
4526), or timberland zoned Timberland Production (as defined by Government Code section
51104(g))?
No Impact. The Project site is zoned CPD, and no land is designated as forest land or timberland withinthe
Project site (City 2020b). Thus, the zoning code amendment associated with the Project would notconflict
with existing zoning for, or cause rezoning of, forest land; and no impact would occur.
d) Would the project result in the loss of forest land or conversion of forest land to non forest use?
Chambers Group, Inc. 21
32
Initial Study for the Warehouse .Discount CeniFr
Project
No Impact. The Project site is zoned CPD, and no land within the Project site is designated as forest land or
timberland (City 2020b). Thus, the zoning code amendment associated with the Project wouldnot result in
the loss or conversion of forest land; and no impact would occur.
e) Would the project involve other changes in the existing environment which, due to their location or
nature, could result in conversion of Farmland, to non-agricultural use or the conversion of forest land
to non forest use?
No Impact. The Project site is currently zoned CPD and does not encompass Prime Farmland, Unique
Farmland, or Farmland of Statewide Importance; land currently under a Williamson Act contract; or land
designated for agricultural, or forest uses (County 2020; DOC 2021a). The zoning code amendment
proposed under the Project would not result in the conversion or loss of farmland or forest land; therefore,
no impacts would occur.
4.3 AIR QUALITY
4.3.1 Impact Analysis
a) Would the project conflict with or obstruct implementation of the applicable air quality plan?
No Impact. The Project site is located within the South -Central Coast Air Basin (Basin) and the boundaries
of the Ventura County Air Pollution Control District (VCAPCD) (VCAQMD 2017). The Project involves zoning
code and development agreement amendments to expand uses on the Projectsite. The Project will not
include any ground disturbances or physical alterations of the existing building on site at this time. Further,
current operations at the Project site will remain unchanged. Any future development within the Project
site or other CPD zones would be evaluated on a case-by-case basis. The current Project would not conflict
with or obstruct implementation of the 2016 Ventura County Air Quality Management Plan; thus, no
impacts would occur.
b) Would the project result in a cumulatively considerable net increase of any criteria pollutant for which
the project region is non -attainment under an applicable federal or state ambient air quality standard?
Chambers Cnroup, Inc.
22
33
AIR QUALITY.
Less than
Where available, the significance criteria
Potentially
Significant with
Less Than
3
established by the applicable air quality
Significant
Mitigation
Significant
No
management district or air pollution control district
Impact
Incorporated
Impact
Impact
may be relied upon to make the following
determinations. Would the project:
(a)
Conflict with or obstruct implementation of the
❑
❑
applicable air quality plan?
(b)
Result in a cumulatively considerable net increase of
any criteria pollutant for which the project region is
❑
❑
❑
non -attainment under an applicable federal or state
ambient air quality standard?
(c)
Expose sensitive receptors to substantial pollutant
❑
❑
❑
-
concentrations?
(d)
Result in other emissions (such as those leading to
odors) adversely affecting a substantial number of
❑
❑
❑
people?
4.3.1 Impact Analysis
a) Would the project conflict with or obstruct implementation of the applicable air quality plan?
No Impact. The Project site is located within the South -Central Coast Air Basin (Basin) and the boundaries
of the Ventura County Air Pollution Control District (VCAPCD) (VCAQMD 2017). The Project involves zoning
code and development agreement amendments to expand uses on the Projectsite. The Project will not
include any ground disturbances or physical alterations of the existing building on site at this time. Further,
current operations at the Project site will remain unchanged. Any future development within the Project
site or other CPD zones would be evaluated on a case-by-case basis. The current Project would not conflict
with or obstruct implementation of the 2016 Ventura County Air Quality Management Plan; thus, no
impacts would occur.
b) Would the project result in a cumulatively considerable net increase of any criteria pollutant for which
the project region is non -attainment under an applicable federal or state ambient air quality standard?
Chambers Cnroup, Inc.
22
33
Initial Stagy for the Warehouse hiscount Center
Project
No Impact. The Project involves zoning code and development agreement amendments and will not include
any ground disturbances or physical alterations of the Project site. Further, current operation sat the Project
site will remain; and any future changes to the Project site or other CPD zones would be reviewed on a case-
by-case basis. Therefore, the Project would not result in a cumulatively considerable net increase of any
criteria pollutant for which the Project region is nonattainment; andno impacts would occur.
c) Would the project expose sensitive receptors to substantial pollutant concentrations?
No Impact. The VCAPCD Guidelines detail that carbon monoxide hotspots, fugitive dust, toxic air
contaminant impacts, and San Joaquin Valley Fever Project -related impacts to nearby sensitive receptors
should be analyzed. However, the Project involves zoning code and development agreement amendments
and will not include any ground disturbances or physical alterations of the Project site. Further, current
operations at the Project site will remain; and any future changes to theProject site or other CPD -zoned
parcels would be reviewed on a case-by-case basis. No impacts regarding the Project's potential to expose
sensitive receptors to substantial pollutant concentrationswould occur.
d) Would the project result in other emissions (such as those leading to odors) adversely affecting a
substantial number of people?
No Impact. The Project would not create objectionable odors affecting a substantial number of people, as
the Project involves zoning code and development agreement amendments and will not include any ground
disturbances or physical alterations of the Project site at this time. Any future emissions resulting from
alterations to the current Project site, or any other parcels zoned CPD, wouldbe analyzed on a case-by-case
basis. Therefore, no impacts regarding emissions would occur.
4.4 BIOLOGICAL RESOURCES
Chambers Group, Inc 23
34
Less than
Potentially
Significant
Less Than
4.
BIOLOGICAL RESOURCES.
Significant
with
Significant
No
Would the project:
Impact
Mitigation
Impact
Impact
Incorporated
(a)
Have a substantial adverse effect, either directly or
through habitat modifications, on any species
identified as a candidate, sensitive, or special status
❑
❑
❑
species in local or regional plans, policies, or
regulations, or by the California Department of Fish
and Game or U.S. Fish and Wildlife Service?
(b)
Have a substantial adverse effect on any riparian
habitat or other sensitive natural community
identified in local or regional plans, policies,
❑
❑
❑
regulations or by the California Department of Fish
and Wildlife or U.S. Fish and Wildlife Service?
(c)
Have a substantial adverse effect on state orfederally
protected wetlands (including, but not limited to,
marsh, vernal pool, coastal, etc.) through direct
❑
❑
❑
removal, filling, hydrological interruption, or
other means?
Chambers Group, Inc 23
34
Initial Sttiidy.fiir the Warehouse Discount Center
Project
4.4.1 Impact Analysis
a) Would the project have a substantial adverse effect, either directly or through habitat modification,
on any species identified as candidate, sensitive or special status species in local or regional plans,
policies or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife
Service?
No Impact. According to the United States Fish and Wildlife Service's (USFWS's) Critical Habitat for
Threatened & Endangered Species online database, no critical habitat is located within the Project site or
in close proximity to the site (USFWS 2021a). The Project also involves zoning code and development
agreement amendments and does not require any ground disturbance or physical alteration of the site or
surrounding area. In addition, current operations at the Project site will remain. Therefore, the Project
would not adversely affect species identified as candidate, sensitive, or special status; and no impacts would
occur.
b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural
community identified in local or regional plans, policies or regulations, or by the California Department
of Fish and Wildlife or U.S. Fish and Wildlife Service?
c) Would the project have a substantial adverse effect on state or federally protected wetlands (including
but not limited to marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological
interruption, or other means?
No Impact. According to the USFWS's National Wetlands Inventory, no riparian habitat occurs withinthe
Project site boundary. Land bordering the Project site to the north and east is classified as Freshwater
Forested/Shrub Wetland and Forested/Shrub Riparian habitat; however, the Project involves zoning code
and development agreement amendments and does not require any ground disturbance or physical
alteration of the site or surrounding area (USFWS 2021b). The Project site would continue to operate as it
is currently. Therefore, no onsite or offsite impacts to nearby wetlands, riparian habitat, or a sensitive
natural community would result from the Project.
Chambers Group, Inc 2 l
35
Less than
BIOLOGICAL RESOURCES.
Potentially
Significant
Less Than
No
4
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(d)
Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or
with established native resident or migratory wildlife
❑
❑
❑
corridors, or impede the use of native
wildlife nursery sites?
(e)
Conflict with any local policies or ordinances
protecting biological resources, such as a tree
❑
❑
❑
preservation policy or ordinance?
(f)
Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
El
El
1:1Plan,
or other approved local, regional, or state
habitat conservation plan?
4.4.1 Impact Analysis
a) Would the project have a substantial adverse effect, either directly or through habitat modification,
on any species identified as candidate, sensitive or special status species in local or regional plans,
policies or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife
Service?
No Impact. According to the United States Fish and Wildlife Service's (USFWS's) Critical Habitat for
Threatened & Endangered Species online database, no critical habitat is located within the Project site or
in close proximity to the site (USFWS 2021a). The Project also involves zoning code and development
agreement amendments and does not require any ground disturbance or physical alteration of the site or
surrounding area. In addition, current operations at the Project site will remain. Therefore, the Project
would not adversely affect species identified as candidate, sensitive, or special status; and no impacts would
occur.
b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural
community identified in local or regional plans, policies or regulations, or by the California Department
of Fish and Wildlife or U.S. Fish and Wildlife Service?
c) Would the project have a substantial adverse effect on state or federally protected wetlands (including
but not limited to marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological
interruption, or other means?
No Impact. According to the USFWS's National Wetlands Inventory, no riparian habitat occurs withinthe
Project site boundary. Land bordering the Project site to the north and east is classified as Freshwater
Forested/Shrub Wetland and Forested/Shrub Riparian habitat; however, the Project involves zoning code
and development agreement amendments and does not require any ground disturbance or physical
alteration of the site or surrounding area (USFWS 2021b). The Project site would continue to operate as it
is currently. Therefore, no onsite or offsite impacts to nearby wetlands, riparian habitat, or a sensitive
natural community would result from the Project.
Chambers Group, Inc 2 l
35
Initial Study for the Warehouse Discount Center
Project
d) Would the project Interfere substantially with the movement of any native resident or migratory fish
or wildlife species or with established native resident or migratory wildlife corridors, or impede the use
of native wildlife nursery sites?
No Impact. The Project is located approximately 200 feet west of the Arroyo Simi creek, which may provide
a means of movement and migration, as well as a nursery, for fish species in the area. The Project involves
zoning code and development agreement amendments and does not require any ground disturbance or
physical alteration of the site or surrounding area. Moreover, current operations at the Project site will
remain. No other potential wildlife corridors have been identified inthe Project vicinity. As the Project would
not require construction activities or introduce new operational activities that could impede the flow of the
Arroyo Simi creek or impeded wildlife corridors or movement, no impacts would occur.
e) Would the project conflict with any local policies or ordinances protecting biological resources, such
as a tree preservation policy or ordinance?
No Impact. According to the City's Municipal Code Chapter 12.12 Historic Trees, Native Oak Trees, and
Mature Trees, tree removal permits are required to remove, cut down, or destroy a native oak tree, historic
tree, or other mature tree. The Project involves zoning code and development agreement amendments and
does not require any ground disturbance or physical alteration of the site or surrounding area. As the
Project does not propose to remove trees on site, the Project would comply with the City's Tree
Preservation Ordinance; and no impacts would occur.
f) Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural
Conservancy Conservation Plan, or other approved local, regional, or state habitat conservation plan?
No Impact. The Project site is not located in an area subject to an adopted Habitat Conservation Plan, Natural
Community Conservation Plan, or other approved conservation plans. Therefore, no impactswould occur.
4.5 CULTURAL RESOURCES
4.5.1 Impact Analysis
a) Would the project cause a substantial adverse change in the significance of a historical resource
pursuant to §15064.5?
Chambers (Troup, [ne.
36
Less than
Potentially
Significant
Less Than
5
CULTURAL RESOURCES.
Significant
with
Significant
No
Would the project:
Impact
Mitigation
Impact
Impact
Incorporated
(a)
Cause a substantial adverse change in thesignificance
of a historical resource pursuant to
❑
❑
❑
§ 15064.5?
(b)
Cause a substantial adverse change in thesignificance
of an archaeological resource pursuant
❑
❑
❑
o §15064.5?
(c)
Disturb any human remains, including those interred
❑
❑
❑
outside of formal cemeteries?
4.5.1 Impact Analysis
a) Would the project cause a substantial adverse change in the significance of a historical resource
pursuant to §15064.5?
Chambers (Troup, [ne.
36
Initial Study,for the WarehOlde PiSCOLInt Center
Project
No Impact. According to the CEQA Guidelines and the California Office of Historic Preservation, buildings
constructed over 50 years ago and possessing architectural or historical significance may beconsidered
potential historic resources; the proposed changes to these buildings may require some level of
environmental review. The existing building on the Project site is approximately 15 years old;thus, it is not
considered a historic resource (DAUM 2021). Although there is potential for subsurfacehistorical resources
to be located within the Project site, the Project involves zoning code and development agreement
amendments and does not require any ground disturbance or physical alteration of the existing site or
surrounding area that could impact subsurface resources. Therefore,no impacts would occur.
b) Would the project cause a substantial adverse change in the significance of an archaeological resource
pursuant to §15064.5?
No Impact. There is potential for subsurface archeological resources to be located within the Projectsite;
but, as mentioned above, the Project involves zoning code and development agreement amendments and
does not require any ground disturbance or physical alteration of the existing site or surrounding area that
could impact these subsurface resources. Therefore, no impacts would occur.
c) Would the project disturb any human remains, including those interred outside of formal cemeteries?
No Impact. Although the Project site does not contain a formal cemetery or any known burial grounds,limited
potential remains for subsurface human remains to be located within the Project site. As previously
mentioned, no ground -disturbing activities that could impact these subsurface resources are associated
with the Project, which involves zoning code and development agreement amendments. Thus, no impacts
would occur.
4.6 ENERGY
4.6.1 Impact Analysis
a) Would the project result in potentially significant environmental impact due to wasteful, inefficient or
unnecessary consumption of energy resources, during project construction or operation?
No Impact. The Project involves zoning code and development agreement amendments and does notrequire
any ground disturbance or physical alteration of the existing site. Current operations onsite will also remain;
thus, the amount of energy required onsite will stay consistent with currentconditions. Although the zoning
code amendment proposed by the Project could intensify land use at
Chambers Group, Inc. 't-
37
Lessthan
Potentially
Significant
Less Than
6
ENERGY
Significant
with
Significant
Would the project:
Impact
Mitigation
Impact
Impact
m I
Incorporated
(a)
Result in potentially significant environmental impact
due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
(b)
Conflict with or obstruct a state or local plan
❑
or renewable energy or energy efficiency?
4.6.1 Impact Analysis
a) Would the project result in potentially significant environmental impact due to wasteful, inefficient or
unnecessary consumption of energy resources, during project construction or operation?
No Impact. The Project involves zoning code and development agreement amendments and does notrequire
any ground disturbance or physical alteration of the existing site. Current operations onsite will also remain;
thus, the amount of energy required onsite will stay consistent with currentconditions. Although the zoning
code amendment proposed by the Project could intensify land use at
Chambers Group, Inc. 't-
37
Initial Stutvfor the Warehouse Discount Center
Project
the Project site and other CPD -zoned parcels in the future, these would be reviewed on a case -by- case
basis. Current energy usage at the Project site would continue to avoid being wasteful, inefficient, or
unnecessary; therefore, no impacts would occur.
b) Would the project conflict with or obstruct a state or local plan for renewable energy or energy
efficiency?
No Impact. The Project consists of zoning code and development agreement amendments and does not
require any ground disturbance or physical alteration of the existing site. Current operations onsite will also
remain unchanged. The existing development on the Project site would continue to comply with all
applicable State and local regulations related to renewable energy and energy efficiency, including the 2019
California Building Energy Efficiency Standards and the 2019 California Green Building Standards Code. The
existing development would also continue to align with any applied energy efficiency requirements detailed
in the City's sustainability report and General Plan. Any future alterations to or new development on the
Project site would be required to comply with the City's energy standards as well. The Project would not
conflict with or obstruct a State or local plan for renewable energy or energy efficiency, resulting in no
impacts.
4.7 GEOLOGY AND SOILS
Chambers Group, Inc.
38
Less than
GEOLOGY AND SOILS.
Potentially
Significant
Less Than
No
7
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or
death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the State
Geologist for the area or based on other substantial
❑
❑
El
evidence of a known fault? Refer to Division of
Mines and Geology Special
Publication 42.
,ii) Strong seismic ground shaking?
iii) Seismic -related ground failure, including
❑
❑
liquefaction?
iv) Landslides?
(b)
Result in substantial soil erosion or the loss of
❑
❑
topsoil?
(c)
Be located on a geologic unit or soil that is unstable,or
that would become unstable as a result of the project,
and potentially result in on- or off-site landslide,
❑
❑
lateral spreading, subsidence, liquefaction
or collapse?
(d)
Be located on expansive soil, as defined in Table 18-
1-13 of the Uniform Building Code (1994), creating
❑
❑
El
substantial direct or indirect risksto life or property?
(e)
Have soils incapable of adequately supporting the
use of septic tanks or alternative wastewater
❑
❑
disposal systems where sewers are not available for
he disposal of wastewater?
Chambers Group, Inc.
38
buttal Study for the Warehouse Discount Center
Project
4.7.1 Impact Analysis
a) i) Would the project directly or indirectly cause potential substantial adverse effects, including the risk
of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent
Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or basedon other
substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
No Impact. The City is located in a region with several active faults and therefore is subject to the riskand
hazards associated with earthquakes. The Project site is not located within an Alquist-Priolo FaultZone but
is approximately 1.1 miles north of the Simi -Santa Rosa fault zone (DOC 2021b). The California Department
of Conservation (DOC) has designated an Alquist-Priolo Fault Zone for many ofthe traces of the Simi -Santa
Rosa fault zone. The Project consists of zoning code, and development agreement amendments and does
not require any ground disturbances or physical alterations of theexisting site. Operations on the Project
site will also continue as they are now. The Project would notexacerbate the risk of rupturing a known
earthquake fault; thus, no impacts would result.
ii) Would the project directly or indirectly cause potential substantial adverse effects, including the risk
of loss, injury, or death involving strong seismic ground shaking?
No Impact. As noted above, the Project site is subject to potential ground shaking due to nearby faults.The
Project consists of zoning code and development agreement amendments and does not require any ground
disturbances or physical alterations of the existing site. Current operations onsite will also remain
unchanged. Therefore, the Project would not exacerbate the risk of ground shaking at the Project site,
resulting in no impacts.
iii) Would the project directly or indirectly cause potential substantial adverse effects, including the
risk of loss, injury, or death involving seismic -related ground failure, including liquefaction?
No Impact. A portion of the Project site is located within the Simi Valley West liquefaction zone; however,
the Project consists of zoning code and development agreement amendments and does notrequire any
ground disturbances or physical alterations that would exacerbate Project site conditions(DOC 2021b).
Operations at the Project site would also remain the same. The Project would not exacerbate the risk of
liquefaction, resulting in no impacts.
iv) Would the project directly or indirectly cause potential substantial adverse effects, including the
risk of loss, injury, or death involving landslides?
No Impact. The Project site is flat and does not contain any slopes that pose a risk of landslide. The closest
area prone to landslide is the Simi Valley West landslide zone adjacent to the eastern side of
Chambers Group, Inc. 28
39
Less than
Potentially
Significant
Less Than
7
GEOLOGY AND SOILS.
Significant
with
Significant
No
Would the project:
Impact
Mitigation
Impact
Impact
Incorporated
(f)
Directly or indirectly destroy a unique
paleontological resource or site or unique geological
❑
❑
feature?
4.7.1 Impact Analysis
a) i) Would the project directly or indirectly cause potential substantial adverse effects, including the risk
of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent
Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or basedon other
substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
No Impact. The City is located in a region with several active faults and therefore is subject to the riskand
hazards associated with earthquakes. The Project site is not located within an Alquist-Priolo FaultZone but
is approximately 1.1 miles north of the Simi -Santa Rosa fault zone (DOC 2021b). The California Department
of Conservation (DOC) has designated an Alquist-Priolo Fault Zone for many ofthe traces of the Simi -Santa
Rosa fault zone. The Project consists of zoning code, and development agreement amendments and does
not require any ground disturbances or physical alterations of theexisting site. Operations on the Project
site will also continue as they are now. The Project would notexacerbate the risk of rupturing a known
earthquake fault; thus, no impacts would result.
ii) Would the project directly or indirectly cause potential substantial adverse effects, including the risk
of loss, injury, or death involving strong seismic ground shaking?
No Impact. As noted above, the Project site is subject to potential ground shaking due to nearby faults.The
Project consists of zoning code and development agreement amendments and does not require any ground
disturbances or physical alterations of the existing site. Current operations onsite will also remain
unchanged. Therefore, the Project would not exacerbate the risk of ground shaking at the Project site,
resulting in no impacts.
iii) Would the project directly or indirectly cause potential substantial adverse effects, including the
risk of loss, injury, or death involving seismic -related ground failure, including liquefaction?
No Impact. A portion of the Project site is located within the Simi Valley West liquefaction zone; however,
the Project consists of zoning code and development agreement amendments and does notrequire any
ground disturbances or physical alterations that would exacerbate Project site conditions(DOC 2021b).
Operations at the Project site would also remain the same. The Project would not exacerbate the risk of
liquefaction, resulting in no impacts.
iv) Would the project directly or indirectly cause potential substantial adverse effects, including the
risk of loss, injury, or death involving landslides?
No Impact. The Project site is flat and does not contain any slopes that pose a risk of landslide. The closest
area prone to landslide is the Simi Valley West landslide zone adjacent to the eastern side of
Chambers Group, Inc. 28
39
Jmtial Study far the Warehouse Discount Center
Project
the Project site (DOC 2021b). As described, the Project involves zoning code and development agreement
amendments and does not require any ground disturbances or physical alterations that would create a
significant risk of landslides. Additionally, use of the Project site would remain the same, continuing current
operations. Therefore, the Project would not exacerbate the risk of landslideon site; and no impacts would
occur.
b) Would the project result in substantial soil erosion or the loss of topsoil?
No Impact. The Project involves zoning code and development agreement amendments and does notrequire
any ground disturbances that would create soil erosion or the loss of topsoil. Additionally, useof the Project
site would remain the same as current operations. Therefore, implementation of the Project would not
result in impacts associated with soil erosion or the loss of topsoil.
c) Would the project be located on a geologic unit or soil that is unstable, or that would become unstable
as a result of the project and potentially result in on- or off-site landslide, lateral spreading,
subsidence, liquefaction or collapse?
No Impact. The Project site is not within an active fault zone but is in close proximity to earthquake faults
and landslide zones in the area. The Project is also partially located within the Simi Valley West Liquefaction
Zone (DOC 2021b). The City is underlain primarily by two types of geologic units: relatively weak semi -
consolidated sedimentary bedrock in the hilly and mountainous areas and loose, unconsolidated, alluvial
sediments in the valleys and canyon bottoms (City 2001). Considering the Project does not require any
ground disturbances or physical alterations of the existing site, no impacts regarding landslide, lateral
spreading, subsidence, liquefaction, or collapse would occur as a result of the Project.
d) Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code
(1994), creating substantial direct or indirect risks to life or property?
No Impact. Expansive soils are certain types of clay soils that expand when saturated and shrink whendried.
According to the United States Department of Agriculture's (USDA) Web Soil Survey, the soils on the Project
site are primarily channery loam and Badland, which have a high permeability (USDA 2021; 2015). No soils
that have a large clay component were identified within the Project site. Additionally, the Project would not
require any ground disturbance or operational changes that couldexacerbate potential expansive soils on
site; thus, no impact would occur.
e) Would the project have soils incapable of adequately supporting the use of septic tanks or alternative
wastewater disposal systems where sewers are not available for the disposal of wastewater?
No Impact. The Project does not propose any changes to the existing sewer infrastructure on site. Nonew
septic tanks or alternative wastewater disposal systems would be installed; therefore, no impactswould
occur.
f) Would the project directly or indirectly destroy a unique paleontological resource or site or unique
geological feature?
No Impact. The Department of Conservation's Geologic Map of California shows that the Project siteis
underlain by nonmarine (continental) sedimentary rocks from the Pliocene -Pleistocene (DOC
Chambers Group; Inc. 29
40
Initial Study.for the Warehouse Discount Center
Project
2021c). In general, the potential for a given project to result in adverse impacts to paleontological resources
is directly proportional to the amount of ground disturbance associated with the Project. The Project
requires no ground disturbances or physical alterations to the Project site. Therefore, there is no risk to
unique paleontological resources or geological features; and no impacts would occur.
4.8 GREENHOUSE GAS EMISSIONS
4.8.1 Impact Analysis
a) Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a
significant impact on the environment?
No Impact. The Project involves a zoning code amendment and a development agreement amendment. No
ground disturbances or physical alterations of the Project site are proposed at this time. Further, current
operations at the Project site will remain. No impacts regarding the Project's potential to generate
greenhouse gas emissions would occur.
b) Would the project conflict with an applicable plan, policy, or regulation adopted for the purpose of
reducing the emissions of greenhouse gases?
No Impact. The Project would not conflict with any applicable plan, policy, or regulation of an agency
adopted for the purpose of reducing GHG emissions. Neither the City nor the VCAPCD has adopted aClimate
Action Plan or other qualified GHG reduction plan. The Southern California Association of Governments
(SCAG) has incorporated a sustainable community strategy into its 2016-2040 Regional Transportation
Plan/Sustainable Communities Strategy (RTP/SCS) plan, which is designed to help theregion achieve its
Senate Bill (SB) 375 GHG emissions reduction targets. The SCAG's 2016-2040 RTP/SCS demonstrates that
the SCAG region would achieve its regional emissions reduction targets for the 2020 and 2035 target years.
The Project would not alter the basic population projections used in the plan, and the existing development
on site is consistent with the City's General Plan land use designations for the Project site. Furthermore,
even with the zoning amendment and development agreement amendment, significant site changes that
could conflict with GHG emission reduction goals would not result. Any future new development on site
would be reviewed on a case-by-case basis for consistency with the RTP/SCS, the City's General Plan, and
the City's zoning map. Therefore, the Project would be consistent with the applicable plans and programs
designed to reduce GHG emissions; and no impactswould occur.
Chambers Group, Inc. 3i.
41
Less than
GREENHOUSE GAS EMISSIONS.
Potentially
Significant
Less Than
No
$
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant impact on
❑
❑
❑
he environment?
(b)
Conflict with an applicable plan, policy, or regulation
adopted for the purpose of reducing the emissions
❑
❑
❑
of greenhouse gases?
4.8.1 Impact Analysis
a) Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a
significant impact on the environment?
No Impact. The Project involves a zoning code amendment and a development agreement amendment. No
ground disturbances or physical alterations of the Project site are proposed at this time. Further, current
operations at the Project site will remain. No impacts regarding the Project's potential to generate
greenhouse gas emissions would occur.
b) Would the project conflict with an applicable plan, policy, or regulation adopted for the purpose of
reducing the emissions of greenhouse gases?
No Impact. The Project would not conflict with any applicable plan, policy, or regulation of an agency
adopted for the purpose of reducing GHG emissions. Neither the City nor the VCAPCD has adopted aClimate
Action Plan or other qualified GHG reduction plan. The Southern California Association of Governments
(SCAG) has incorporated a sustainable community strategy into its 2016-2040 Regional Transportation
Plan/Sustainable Communities Strategy (RTP/SCS) plan, which is designed to help theregion achieve its
Senate Bill (SB) 375 GHG emissions reduction targets. The SCAG's 2016-2040 RTP/SCS demonstrates that
the SCAG region would achieve its regional emissions reduction targets for the 2020 and 2035 target years.
The Project would not alter the basic population projections used in the plan, and the existing development
on site is consistent with the City's General Plan land use designations for the Project site. Furthermore,
even with the zoning amendment and development agreement amendment, significant site changes that
could conflict with GHG emission reduction goals would not result. Any future new development on site
would be reviewed on a case-by-case basis for consistency with the RTP/SCS, the City's General Plan, and
the City's zoning map. Therefore, the Project would be consistent with the applicable plans and programs
designed to reduce GHG emissions; and no impactswould occur.
Chambers Group, Inc. 3i.
41
Initial StUdv ?'or the Warehouse Discount (,'en
Project
4.9 HAZARDS AND HAZARDOUS MATERIALS
4.9.1 Impact Analysis
a) Would the project create a significant hazard to the public or the environment through the routine
transport, use, or disposal of hazardous materials?
No Impact. The Project involves a zoning code amendment and a development agreement amendment. No
ground disturbance or physical alteration of the Project site is proposed. Further, operations at the Project
site will remain unchanged. The operation of the facility necessitates the routine transport of potentially
hazardous commercial materials, including but not limited to, gasoline, oil, solvents, cleaners, paint,
pesticides, and fertilizer. Any potentially hazardous materials used or found on site would continue to be
handled in accordance with State and federal regulations regarding the transport, use, and storage of
hazardous materials. No new hazards would be introduced as a result of the Project; thus, no impacts would
occur.
b) Would the project create a significant hazard to the public or the environment through reasonably
foreseeable upset and accident conditions involving the release of hazardous materials into the
environment?
Chambers Group, fac.
42
Less than
HAZARDS AND HAZARDOUS MATERIALS.
Potentially
Significant
Less Than
No
9.
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Create a significant hazard to the public or the
environment through the routine transport, use, or
❑
❑
❑
disposal of hazardous materials?
(b)
Create a significant hazard to the public or the
environment through reasonably foreseeable upset
❑
El
❑
and accident conditions involving the release of
hazardous materials into the environment?
(c)
Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
❑
❑
❑
within one-quarter mile of an existing or proposed
school?
(d)
Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
❑
❑
❑
would it create a significant hazard to the public or
he environment?
(e)
For a project located within an airport land use planor,
where such a plan has not been adopted, within 2
miles of a public airport or public use airport,would
❑
❑
❑
the project result in a safety hazard or excessive noise
for people residing or working in the
Project area?
(f)
Impair implementation of or physically interferewith
an adopted emergency response plan or
❑
❑
❑
emergency evacuation plan?
(g)
Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury, or death
❑
❑
❑
involvingwildland fires?
4.9.1 Impact Analysis
a) Would the project create a significant hazard to the public or the environment through the routine
transport, use, or disposal of hazardous materials?
No Impact. The Project involves a zoning code amendment and a development agreement amendment. No
ground disturbance or physical alteration of the Project site is proposed. Further, operations at the Project
site will remain unchanged. The operation of the facility necessitates the routine transport of potentially
hazardous commercial materials, including but not limited to, gasoline, oil, solvents, cleaners, paint,
pesticides, and fertilizer. Any potentially hazardous materials used or found on site would continue to be
handled in accordance with State and federal regulations regarding the transport, use, and storage of
hazardous materials. No new hazards would be introduced as a result of the Project; thus, no impacts would
occur.
b) Would the project create a significant hazard to the public or the environment through reasonably
foreseeable upset and accident conditions involving the release of hazardous materials into the
environment?
Chambers Group, fac.
42
Initial study for the Warehouse Disc-'unt Center
Project
No Impact. The Project involves a zoning code amendment and a development agreement amendment. No
ground disturbance or physical alteration of the existing building onsite is proposedat this time. Further,
current operations at the Project site will remain unchanged. Use of hazardous materials during operations
would continue to be limited to the use of commercially available substances. All operational activities would
continue to adhere to local standards set forth by the City,as well as State and federal health and safety
requirements that are intended to minimize risk to thepublic from hazardous materials, such as California
Division of Occupational Safety and Health (Cal/OSHA) requirements, the Hazardous Waste Control Act, the
California Accidental Release Prevention (CalARP) Program, and the California Health and Safety Code. As a
result, the Project wouldnot create a significant hazard to the public orthe environment through reasonably
foreseeable upsetand accident conditions involving the release of hazardous materials; no impacts would
occur.
c) Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials,
substances, or waste within one-quarter mile of an existing or proposed school?
No Impact. No ground disturbances or physical alterations of the Project site are proposed as part ofthe
Project. Operations at the Project site would also remain unchanged. Therefore, the Project would not require
an expanded use of potentially hazardous commercial materials. Further, the Project siteis not within 0.25
mile of an existing or proposed school. Operations at the Project site would continueto comply with local
regulations and standards set forth by the City, State, and federal governments;thus, no impacts would
occur.
d) Would the project be located on a site which is included on a list of hazardous materials sites compiled
pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to
the public or the environment?
No Impact. A review of federal and State standard and supplemental databases indicated that the Project
site is not located within an identified hazardous material site pursuant to Government Code Section
65962.5. The closest open hazardous site is approximately 0.75 mile southwest of the Projectsite; but it has
been eligible for closure since February 12, 2020 (SWRCB 2021; DTSC 2021). The Projectwould not create a
significant hazard to the public or the environment as no activities are proposed that would disturb a
hazardous materials site; no impacts would occur.
e) For a project located within an airport land use plan or, where such a plan has not been adopted,
within 2 miles of a public airport or public use airport, would the project result in a safety hazard or
excessive noise for people residing or working in the project area?
No Impact. The Project site is located approximately 12 miles southeast of Santa Paula Airport and 14 miles
northeast of Camarillo Airport (Google 2021). The Project site is not within the Airport Influence Area for
either of these airports (ALUC 2000). No impact would occur.
f) Would the project impair implementation of or physically interfere with an adopted emergency
response plan or emergency evacuation plan?
No Impact. According to the Safety Element of the City's General Plan, the City has developed an Emergency
Services Program to maintain a responsible level of emergency preparedness. This program includes City
staff receiving training in emergency preparedness, management, and mitigation; the City maintaining the
Emergency Operations Center (EOC); the City organizing and
Chambers Group, Inc.
43
Initial Stvdy for the Warehouse Discount Center
Project
training a Disaster Assistant Response Team composed of volunteers; and the City promoting emergency
planning, training, public awareness, and education (City 2001). The EOC is the focal pointfor coordination
of the City's emergency planning, training, response, and recovery efforts for emergencies and major
disasters (City 2021). Additionally, the County's Multi -Hazard Mitigation Plan(MHMP) includes an overview
of the risk assessment process and identifies hazards present in the jurisdiction, hazard profiles, and
vulnerability assessments. The plan also identifies goals, objectives, and actions for each jurisdiction in the
County, including participating cities (such as Moorpark) and unincorporated areas of the County (County
2015).
The Project involves a zoning code amendment and development agreement amendment and will notinclude
any ground disturbance or physical alteration of the Project site. The Project would not interfere with the
City's Emergency Services Program or the MHMP because it would not prohibit subsequent programs or
plans from being established or prevent the goals and objectives of existingplans from being carried out. No
impacts regarding an emergency response or evacuation plan wouldoccur.
g) Would the project expose people or structures, either directly or indirectly, to a significant risk of loss,
injury or death involving wildland fires?
No Impact. The Project is not located within CAL FIRE's designated Very High Fire Severity Zone (CAL FIRE
2021). Moreover, the Project involves a zoning code amendment and a development agreement
amendment, so no ground disturbance or physical alteration of the Project site could create risk involving
wildland fires. Current operations at the Project site will remain unchanged; therefore, operations on the
site would not exacerbate the risk of fire. The Project would not expose people or structures, either directly
or indirectly, to a significant risk of loss, injury, or death involving wildland fires; and no impacts would
occur.
4.10 HYDROLOGY AND WATER QUALITY
Chambers Group, Inc.
33
44
Less than
HYDROLOGY AND WATER QUALITY.
Potentially
Significant
Less Than
No
10.
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Violate any water quality standards or waste
discharge requirements or otherwise substantially
❑
❑
❑
degrade surface or ground water quality?
(b)
Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge
❑
❑
❑
such that the project may impede sustainable
groundwater management of the basin?
(c)
Substantially alter the existing drainage pattern of the
site or area, including through the alteration of the
course of a stream or river or through the addition of
impervious surfaces, in a manner which
would:
i) Result in substantial erosion or siltation on- or off-
ff-
El
s
ii)
ii) Substantially increase the rate or amount of
surface runoff in a manner which would result in
❑
❑
flood on- or off-site;
Chambers Group, Inc.
33
44
Initial Study for th,, Warehouse Discount Center
'roject
4.10.1 Impact Analysis
a) Would the project violate any water quality standards or waste discharge requirements, or otherwise
substantially degrade surface or ground water quality?
No Impact. The Project involves a zoning code amendment and development agreement amendmentand
will not include any ground disturbance or physical alteration of the Project site. The Project would
therefore not increase the impervious surfaces on the Project site, and existing drainage patterns would
remain unchanged. Additionally, operations on the Project site would continue as theyare currently and
would not degrade surface or groundwater quality. The Project would not violate water quality standards
or discharge requirements, and no impacts would occur.
b) Would the project substantially decrease groundwater supplies or interfere substantially with
groundwater recharge such that the project may impede sustainable groundwater management of
the basin?
No Impact. The Ventura County Water and Sanitation Department (VCWSD) operates and maintains water
and wastewater infrastructure for the City, which is located in Ventura County Waterworks District
(VCWWD) Number 1. VCWWD's water supply comes from both imported and local sources. In 2019,
approximately 80 percent of VCWWD's total water supply came from the State Water Project, and
approximately 20 percent came from groundwater wells in the City. Groundwater is currently produced
from the East Las Posas Groundwater Basin, which is managed by Fox Canyon Groundwater Management
Agency (FCGMA), via five wells owned and operated by VCWWD. Production ranges from 600 gallons per
minute (gpm) to 1,100 gpm, and an existing total system capacity of approximately 3,500 gpm (VCWWD
2016).
The Project consists of a zoning code amendment and a development agreement amendment to allow
expanded uses in CPD zones. The Project would not include alterations to the existing development on the
Project site that would decrease or interfere with groundwater recharge. The operations on site would
remain unchanged. Therefore, water infrastructure and usage on site would not change asa result of the
Project, and no impacts would occur.
Chambers Group, Inc.
34
45
Less than
HYDROLOGY AND WATER QUALITY.
Potentially
Significant
Less Than
No
10.
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
iii) Create or contribute runoff water which would
exceed the capacity of existing or plan nedstormwater
❑
❑
❑
drainage systems or provide substantial
additional sources of polluted runoff; or
iv) Impede or redirect flood flows?
Ll
Ll
Ll
Z
(d)
In flood hazard, tsunami, orseiche zones, risk release
El
El
El
pollutants due to project inundation?
(e)
Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
❑
❑
❑
management plan?
4.10.1 Impact Analysis
a) Would the project violate any water quality standards or waste discharge requirements, or otherwise
substantially degrade surface or ground water quality?
No Impact. The Project involves a zoning code amendment and development agreement amendmentand
will not include any ground disturbance or physical alteration of the Project site. The Project would
therefore not increase the impervious surfaces on the Project site, and existing drainage patterns would
remain unchanged. Additionally, operations on the Project site would continue as theyare currently and
would not degrade surface or groundwater quality. The Project would not violate water quality standards
or discharge requirements, and no impacts would occur.
b) Would the project substantially decrease groundwater supplies or interfere substantially with
groundwater recharge such that the project may impede sustainable groundwater management of
the basin?
No Impact. The Ventura County Water and Sanitation Department (VCWSD) operates and maintains water
and wastewater infrastructure for the City, which is located in Ventura County Waterworks District
(VCWWD) Number 1. VCWWD's water supply comes from both imported and local sources. In 2019,
approximately 80 percent of VCWWD's total water supply came from the State Water Project, and
approximately 20 percent came from groundwater wells in the City. Groundwater is currently produced
from the East Las Posas Groundwater Basin, which is managed by Fox Canyon Groundwater Management
Agency (FCGMA), via five wells owned and operated by VCWWD. Production ranges from 600 gallons per
minute (gpm) to 1,100 gpm, and an existing total system capacity of approximately 3,500 gpm (VCWWD
2016).
The Project consists of a zoning code amendment and a development agreement amendment to allow
expanded uses in CPD zones. The Project would not include alterations to the existing development on the
Project site that would decrease or interfere with groundwater recharge. The operations on site would
remain unchanged. Therefore, water infrastructure and usage on site would not change asa result of the
Project, and no impacts would occur.
Chambers Group, Inc.
34
45
Initial Study for the Warehouse Discount Center
Project
c) Would the project substantially alter the existing drainage pattern of the site or area, including
through the alteration of the course of a stream or river or through the addition of impervious surfaces,
in a manner which would:
i) result in substantial erosion or siltation on- or off-site;
ii) substantially increase the rate or amount of surface runoff in a manner which would result in
flooding on- or off-site;
iii) create or contribute runoff water which would exceed the capacity of existing or planned
stormwater drainage systems or provide substantial additional sources or polluted runoff; or
iv) impede or redirect flood flows?
No Impact. According to Federal Emergency Management Agency's (FEMA's) National Flood Hazard Layer
Viewer, the Project site is not located within the FEMA designated floodway or floodplain (FEMA 2021).
Further, the Project involves a zoning code amendment and development agreement amendment. No
ground disturbance or physical alteration of the Projectsite is proposed. Additionally, operations on the
Project site would be unchanged. The Project would therefore not increase erosion, siltation, or runoff on
the Project site as impervious surfaces on site would not be altered. Existing drainage patterns on the Project
site would remain,and no impacts would occur.
d) Would the project in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project
inundation?
No Impact. The Project is not located within the FEMA floodplain or floodway, and operations at the Project
site would remain the same as existing operations on site (FEMA 2021). The Project would continue to
necessitate the routine transport of potentially hazardous commercial materials, but any potentially
hazardous materials used or found on site would continue to be handled in accordance with State and
federal regulations. Additionally, no ground disturbance or physical alteration of the existing site is
proposed; thus, drainage patterns would remain unchanged, and the risk of pollutant release would not
increase. The Project is also over 20 miles east of the Pacific Ocean and is not in thevicinity of any waterbodies
that have potential to produce a seiche (Google 2021). The Project has norisk of inundation; therefore, no
impacts would occur.
e) Would the project conflict with or obstruct implementation of a water quality control plan or
sustainable groundwater management plan ?
No Impact. The Project is located within the VCWWD Number 1 service area (VCWWD 2016). As a result of
the Project, the existing structure on the Project site will remain in-place, no new structureswould be
constructed, and drainage patterns would remain the same. The Project would continue to utilize the
existing water and sewer infrastructure on site, and operations would remain the same. Additionally, an
increase in groundwater extraction would not result from the Project. The Project would therefore not
conflict with or obstruct the VCWWD 2015 Urban Water Management Plan, andno impacts would occur.
Chambers Group, Inc. 35
46
Initial Siudv for the Warehouse Discount Center
Project
4.11 NOISE
4.11.1 Impact Analysis
a) Would the project result in generation of a substantial temporary or permanent increase in ambient
noise levels in the vicinity of the project in excess of standards established in the local general plan or
noise ordinance, or applicable standards of other agencies?
No Impact. The Noise Element of the City's General Plan implements goals and policies to maintain
acceptable environmental noise levels to protect City residents from excessive noise. The Noise Element
establishes noise standards for single-family and multiple -family residential land uses as 65 Community
Noise Equivalent Level (CNEL) for the exterior environment, 55 CNEL for the interior environment with
windows open, and 45 CNEL for the interior environment with windows closed (City1998).
Background noise, or ambient noise, is the noise level of normal and existing noise levels of a given area. In
the City, the four major sources of noise are traffic on SR -118 and SR -23; traffic on arterials and local
collector roadways; rail traffic on the east/west rail line bisecting the City; and commercial, industrial, and
recreational activities adjacent to residential locations (City 1998). The existing immediate sources of
ambient noise in the vicinity of the Project site come from SR -118, the rail line,vehicles (personal,
commercial trucks, and shipping trucks), operational equipment from the nearby businesses, and other
outdoor noises from customers and employees. The Project would not introduce a new noise source that
would result in a permanent increase in ambient noise levels because no alterations to the existing
development on site are proposed, and operations at the site would remain unchanged. No impacts
regarding noise would result.
b) Would the project result in generation of excessive groundborne vibration or groundborne noise levels?
No Impact. Groundborne noise occurs when vibrations radiate through a building's interior and it creates
a low -frequency sound. A vibration is an oscillatory motion, or a back -and -forth movement from a place of
rest. Indoor vibration is commonly caused by the operation of mechanical equipment
Chambers Group, Inc.
R
47
Less than
NOISE
Potentially
Significant
Less Than
No
11.
Would the project result in:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the
project in excess of standards established in the local
❑
❑
❑
general plan or noise ordinance, or applicable
standards of other agencies?
(b)
Generation of excessive groundborne vibration or
El
El
Elgroundborne
noise levels?
(c)
For a project located within the vicinity of a private
airstrip or an airport land use plan or, where such a
plan has not been adopted, within two miles of a
❑
❑
public airport or public use airport, would the project
expose people residing or working inthe project area
to excessive noise levels?
4.11.1 Impact Analysis
a) Would the project result in generation of a substantial temporary or permanent increase in ambient
noise levels in the vicinity of the project in excess of standards established in the local general plan or
noise ordinance, or applicable standards of other agencies?
No Impact. The Noise Element of the City's General Plan implements goals and policies to maintain
acceptable environmental noise levels to protect City residents from excessive noise. The Noise Element
establishes noise standards for single-family and multiple -family residential land uses as 65 Community
Noise Equivalent Level (CNEL) for the exterior environment, 55 CNEL for the interior environment with
windows open, and 45 CNEL for the interior environment with windows closed (City1998).
Background noise, or ambient noise, is the noise level of normal and existing noise levels of a given area. In
the City, the four major sources of noise are traffic on SR -118 and SR -23; traffic on arterials and local
collector roadways; rail traffic on the east/west rail line bisecting the City; and commercial, industrial, and
recreational activities adjacent to residential locations (City 1998). The existing immediate sources of
ambient noise in the vicinity of the Project site come from SR -118, the rail line,vehicles (personal,
commercial trucks, and shipping trucks), operational equipment from the nearby businesses, and other
outdoor noises from customers and employees. The Project would not introduce a new noise source that
would result in a permanent increase in ambient noise levels because no alterations to the existing
development on site are proposed, and operations at the site would remain unchanged. No impacts
regarding noise would result.
b) Would the project result in generation of excessive groundborne vibration or groundborne noise levels?
No Impact. Groundborne noise occurs when vibrations radiate through a building's interior and it creates
a low -frequency sound. A vibration is an oscillatory motion, or a back -and -forth movement from a place of
rest. Indoor vibration is commonly caused by the operation of mechanical equipment
Chambers Group, Inc.
R
47
Initial Study fir the Warehouse Lliscount Center
Project
or from the movement of people. Outdoor vibration can be sourced from construction equipment, trains,
and traffic (FTA 2018).
As mentioned above, the Noise Element of the City General Plan implements goals and policies to maintain
acceptable environmental noise levels to protect City residents from excessive noise. During operations,
Section 17.53.070.E of the Municipal Code prohibits the loading, unloading, opening, closing, or other
handling of boxes, crates, containers, building materials, garbage cans, or similar objects between the hours
of 10:00 p.m. and 7:00 a.m. any day of the week in such a manner as to cause a noise disturbance across a
residential property line or at any time to violate the provisions ofSection 17.53.050. The Project involves a
zoning code amendment and will not include any ground disturbances that could result in groundborne
noise and vibration to the Project site. Further, currentoperations at the Project site will remain unchanged
and will continue to comply with the City's Municipal Code. Thus, no impacts regarding the current Project's
potential to generate excessive groundborne vibration or groundborne noise levels would occur.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such
a plan has not been adopted, within two miles of a public airport or public us airport, would the project
expose people residing or working in the project area to excessive noise levels?
No Impact. The Project site is located approximately 12 miles southeast of Santa Paula Airport and 14 miles
northeast of Camarillo Airport (Google Maps 2021). The Project site is not within the Airportlnfluence Area
for either of these airports (ALUC 2000). No impact would occur.
4.12 LAND USE AND PLANNING
4.12.1 Impact Analysis
a) Would the project physically divide an established community?
No Impact. The Project site is zoned CPD and is designated in the City's General Plan as General Commercial
(C-2). The Project proposes a zoning code amendment to allow additional conditionally permitted uses on
the Project site that are currently not allowed in the CPD zone to be more consistent with the physical
aspects of the property and the surrounding area. The additionalallowable uses in the proposed amended
zone language are as follows:
4.1.a. Laboratories: research and scientific, upon the grant of a conditional use permit.
4.1.b. Manufacturing and assembly including, but not limited to, appliances, cabinets, cleaners,
clothing, computers, cosmetics, detergents, electronics, furniture, leather products, machinery,
Chambers Group, [tic. 37
48
Less than
Potentially
LAND USE/PLANNING
Significant
Less Than
No
12 Significant
Would the project:
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a) Physically divide an established community?
(b) Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?
4.12.1 Impact Analysis
a) Would the project physically divide an established community?
No Impact. The Project site is zoned CPD and is designated in the City's General Plan as General Commercial
(C-2). The Project proposes a zoning code amendment to allow additional conditionally permitted uses on
the Project site that are currently not allowed in the CPD zone to be more consistent with the physical
aspects of the property and the surrounding area. The additionalallowable uses in the proposed amended
zone language are as follows:
4.1.a. Laboratories: research and scientific, upon the grant of a conditional use permit.
4.1.b. Manufacturing and assembly including, but not limited to, appliances, cabinets, cleaners,
clothing, computers, cosmetics, detergents, electronics, furniture, leather products, machinery,
Chambers Group, [tic. 37
48
Initial Study.f<ir the Warehouse Discount Center
Project
medical and scientific instruments, paper, perfumes, pharmaceuticals, photographic and optical goods,
plastic products, signs and advertising displays, soap, textiles and other uses which the community
development director determines to be similar when in compliance with Section 17.20.030, upon the grant
of a conditional use permit.
4.1.c. Motion picture, television, or still photography production (and related activities and
structures) in accordance with Section 12.28.120, upon the grant of a conditional use permit.
4.1.d. Warehousing, with at least 10 percent of the floor area of the building dedicated to retailuses
upon the grant of a conditional use permit.
The Project would not include any ground disturbance or physical alteration of the Project site, and existing
uses are currently consistent with the CPD zone. Further, operations at the Project site will remain
unchanged. As a result of the zoning code amendment associated with the Project, future projects in the
subject property may proposed additional conditionally permitted uses that are traditionally industrial in
nature. However, the Project site is neighboring Ensign -Bickford parcels zoned Limited Industrial (M-2); the
Science Drive area zoned Industrial Park (M-1); and the Princeton/Condor area zoned M-1 (City 2020b).
Only the hotel and small retail building adjacent to the Project site are not zoned industrial. The Project site
does not contain any parcels zoned for residential purposes. Therefore, execution of the zoning code
amendment is not expected to physically divide an established community if industrial uses intensify on the
Project site.
b) Would the project cause a significant environmental impact due to a conflict with any land use plan,
policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
Less Than Significant Impact. The Project proposes a zoning code amendment to allow additional
conditionally permitted uses on the Project site that are currently not allowed in the CPD zone to be more
consistent with the physical aspects of the Project site and the surrounding area. The existing uses on site
are consistent with the CPD zone, and no ground disturbance or physical alteration of the Project site is
proposed. Further, current operations at the Project site will remain unchanged. Thus, the Project would
not cause significant environmental impacts within the Project site.
With the exception of the subject property, no other areas of the City would be affected by allowing
additional conditionally permitted uses in CPD zones given the site-specific criteria included in the proposed
ordinance. This includes that the site is greater than eight acres and adjacent to both a freeway interchange
and an arterial roadway. Any subsequent uses proposed would be considered on a case-by-case basis and
under separate analysis. Therefore, potential impacts associated with this Project would be less than
significant.
4.13 MINERAL RESOURCES
Chambers Group, Inc.
38
49
Less than
Potentially
Significant
Less Than
13
MINERAL RESOURCES
Significant
with
Significant
No
Would the project:
Impact
Mitigation
Impact
Impact
Incorporated
(a)
Result in the loss of availability of a known mineral
resource that would be of value to the region and the
❑
❑
residents of the state?
Chambers Group, Inc.
38
49
Initial Study for the Warehouse Discount Cert=
Project
(b)
Result in the loss of availability of a locally -important
Less than
mineral resource recovery site delineated on a local
❑
❑
Less Than
No
14.
general plan, specific plan or other land use plan?
Significant
with
Significant
Impact
4.13.1 Impact Analysis
a) Would the project result in the loss of availability of a known mineral resource that would be of value
to the region and the residents of the state?
b) Would the project result in the loss of availability of a locally -important mineral resource recovery site
delineated on a local general plan, specific plan or other land use plan?
No Impact. According to the City's General Plan, no known mineral resources of statewide significance are
within the City's limits; thus, no known mineral resources are within the Project site. Additionally, the Project
entails a zoning code amendment and a development agreement amendment, which would not require
ground disturbance or physical alteration of the Project site. The Project would notresult in the loss of
availability of a known mineral resource, so no impacts would occur.
4.14 POPULATION AND HOUSING
4.14.1 Impact Analysis
a) Would the project induce substantial unplanned population growth in an area, either directly (for
example, by proposing new homes and businesses) or indirectly (for example, through extension of
roads or other infrastructure)?
Less Than Significant Impact. The Project involves a zoning code amendment and development agreement
amendment and will not include any ground disturbance or physical alteration of the Project site. Further,
current operations at the Project site will remain unchanged. The zoning code amendment associated with
the Project would allow additional conditionally permitted uses within the CPD zone but would not include
the addition of residential uses. Implementation of the Project would therefore not result in the
construction of new homes or result in the extension of roads or other infrastructure that could induce
unplanned population growth. New businesses may result fromthe Project's zoning code amendment, but
the population effects of any future development would be examined on a case-by-case basis. Thus,
population impacts resulting from the Project would be less than significant.
Chambers Group, Inc.
39
50
Less than
POPULATION AND HOUSING.
Potentially
Significant
Less Than
No
14.
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Induce substantial unplanned population growth in an
area, either directly (for example, by proposing new
homes and businesses) or indirectly (for example,
❑
through extension of roads or other
infrastructure)?
(b)
Displace substantial numbers of existing people or
housing, necessitating the construction of
❑
❑
❑
replacement housing elsewhere?
4.14.1 Impact Analysis
a) Would the project induce substantial unplanned population growth in an area, either directly (for
example, by proposing new homes and businesses) or indirectly (for example, through extension of
roads or other infrastructure)?
Less Than Significant Impact. The Project involves a zoning code amendment and development agreement
amendment and will not include any ground disturbance or physical alteration of the Project site. Further,
current operations at the Project site will remain unchanged. The zoning code amendment associated with
the Project would allow additional conditionally permitted uses within the CPD zone but would not include
the addition of residential uses. Implementation of the Project would therefore not result in the
construction of new homes or result in the extension of roads or other infrastructure that could induce
unplanned population growth. New businesses may result fromthe Project's zoning code amendment, but
the population effects of any future development would be examined on a case-by-case basis. Thus,
population impacts resulting from the Project would be less than significant.
Chambers Group, Inc.
39
50
Initial Siudy for the Warehouse Discount Center
Project
b) Would the project displace substantial numbers of existing people or housing, necessitating the
construction of replacement housing elsewhere?
No Impact. As mentioned above, the Project involves a zoning code amendment and development
agreement amendment and will not include new construction that would displace existing people or
housing. Other areas of the City may be affected by allowing additional conditionally permitted uses within
the CPD zone that could result in displacement. However, the development of each of the CPD -zoned parcels
would require separate analyses and would be considered on a case-by-case basis. Further, current
operations at the Project site will remain unchanged. The zoning code amendment associated with the
Project would expand conditionally permitted uses within the CPD zone. The Project would not require the
construction of replacement housing elsewhere, as no impacts to housing would occur.
4.15 PUBLIC SERVICES
4.15.1 Impact Analysis
a) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
the construction of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for fire protection?
b) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
the construction of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for police protection?
c) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
the construction of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for schools?
d) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
Chambers Group, Inc. 40
51
Less than
PUBLIC SERVICES.
Potentially
Significant
Less Than
No
15.
Significant
with
Significant
Impact
Mitigation
Impact
Impact
Incorporated
(a)
Would the project result in substantial adverse
physical impacts associated with the provision ofnew
or physically altered governmental facilities,need for
new or physically altered governmentalfacilities, the
construction of which could cause significant
environmental impacts, in order to maintain
acceptable service ratios, response times or other
performance objectives for any of the public
services:
i) Fire Protection?
ii) Police Protection?
El
El
El
iii) Schools?
D
El
El
iv) Parks?
El
0
El
V) Other public facilities?
El
1:1
El
4.15.1 Impact Analysis
a) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
the construction of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for fire protection?
b) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
the construction of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for police protection?
c) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
the construction of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for schools?
d) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
Chambers Group, Inc. 40
51
Initial Staidv For the Warehouse Discount Center
Project
the construction of which could cause significant environmental impacts, in order to maintain acceptable
service ratios, response times or other performance objectives for parks?
e) Would the project result in substantial adverse physical impacts associated with the provision of new
or physically altered governmental facilities, need for new or physically altered governmental facilities,
the construction of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for other public facilities?
No Impact. The Project consists of a zoning amendment and development agreement amendment and
would not require physical alterations to the Project site. Operations on the Project site would also remain
unchanged. The zoning code amendment associated with the Project would the conditionally permitted
uses within the CPD zone. Therefore, the Project would not result in the construction of new homes or in
the extension of infrastructure that could result in population growthrequiring new or altered governmental
facilities such as fire protection, police protection, schools, and parks. New businesses may result from the
Project's zoning code amendment, but the effects of any future development on governmental facilities
would be examined by the City on a case-by-case basis. The Project would maintain current acceptable
service ratios, response times, or other performance objectives for governmental facilities in the area; and
no impacts would occur.
4.16 RECREATION
4.16.1 Impact Analysis
a) Would the project increase the use of existing neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
No Impact. Four parks are within an approximately 1 -mile radius of the Project site: Mammoth Highlands
Park, Happy Camp Canyon Park, Virginia Colony Park, and Campus Park (Google 2021). TheProject involves
a zoning code amendment and development agreement amendment and will not include modifications to
the Project site that would create direct or indirect impacts to existing parksor other recreational facilities.
Further, current operations at the Project site will remain unchanged and would not result in changes to
existing parks. New businesses may result from the Project's zoningcode amendment that may lead to
increased population growth and increased demand on recreational facilities. However, any future
development outside the Project site would be examinedby the City on a case-by-case basis. The Project
would not increase the use of the existing
Chamhers Group, Inc.
41
52
Less than
RECREATION.
Potentially
Significant
Less Than
16.
Would the project:
Significant
with
Significant
m I
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration
❑
❑
❑
of the facility would occur or be
accelerated?
(b)
Does the project include recreational facilities or
require the construction or expansion of recreational
❑
❑
❑
facilities which might have an adverse
physical effect on the environment?
4.16.1 Impact Analysis
a) Would the project increase the use of existing neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
No Impact. Four parks are within an approximately 1 -mile radius of the Project site: Mammoth Highlands
Park, Happy Camp Canyon Park, Virginia Colony Park, and Campus Park (Google 2021). TheProject involves
a zoning code amendment and development agreement amendment and will not include modifications to
the Project site that would create direct or indirect impacts to existing parksor other recreational facilities.
Further, current operations at the Project site will remain unchanged and would not result in changes to
existing parks. New businesses may result from the Project's zoningcode amendment that may lead to
increased population growth and increased demand on recreational facilities. However, any future
development outside the Project site would be examinedby the City on a case-by-case basis. The Project
would not increase the use of the existing
Chamhers Group, Inc.
41
52
Initial Study for the Warehouse Discount Center
Project
neighborhood and regional parks or other recreational facilities at this time; therefore, no impacts would
occur.
b) Does the project include recreational facilities or require the construction or expansion of recreational
facilities which might have an adverse physical effect on the environment?
No Impact. The Project involves a zoning code amendment and development agreement amendmentand
does not involve construction or expansion of recreational facilities. No ground disturbance or physical
alteration of the existing building on site is proposed at this time, and current operations at the Project site
will remain unchanged. New future businesses may result from the Project's zoning code amendment, but
the need for the construction or expansion of recreational facilities would be examined by the City on a
case-by-case basis. As such, no impacts would occur.
4.17 TRANSPORTATION
4.17.1 Impact Analysis
a) Would the project conflict with a program, plan, ordinance or policy addressing the circulation system,
including transit, roadways, bicycle and pedestrian facilities?
No Impact. The Project involves a zoning code amendment and development agreement amendmentto
expand allowable uses within the Project site, zoned CPD. The Project would not include any modifications
to the City's Circulation Element, nor would it involve new uses or construction that could require revisions
to the Circulation Element. No ground disturbances or physical alterations of the Project site are proposed
at this time, and current operations at the Project site will remain unchanged. Future development in CPD
zones in the City may result from the proposed zoning code amendment, but impacts to the City's
circulation system resulting from these projects would be examined by the City on a case-by-case basis. The
proposed new uses on the designated Project site would not result in impacts to the current circulation
system in the City at this time; thus, no impactswould occur.
b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
Chambers Group, File.
53
Less than
TRANSPORTATION.
Potentially
Significant
Less Than
No
17.
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Conflict with a program, plan, ordinance or policy
addressing the circulation system, including transit,
❑
El
❑
roadways, bicycle and pedestrian facilities?
(b)
Conflict or be inconsistent with CEQA Guidelines
❑
❑
❑
section 15064.3, subdivision (b)?
(c)
Substantially increase hazards due to a geometric
design feature (e. g., sharp curves or dangerous
❑
❑
❑
intersections) or incompatible uses (e.g., farm
equipment)?
(d)
Result in inadequate emergency access?
4.17.1 Impact Analysis
a) Would the project conflict with a program, plan, ordinance or policy addressing the circulation system,
including transit, roadways, bicycle and pedestrian facilities?
No Impact. The Project involves a zoning code amendment and development agreement amendmentto
expand allowable uses within the Project site, zoned CPD. The Project would not include any modifications
to the City's Circulation Element, nor would it involve new uses or construction that could require revisions
to the Circulation Element. No ground disturbances or physical alterations of the Project site are proposed
at this time, and current operations at the Project site will remain unchanged. Future development in CPD
zones in the City may result from the proposed zoning code amendment, but impacts to the City's
circulation system resulting from these projects would be examined by the City on a case-by-case basis. The
proposed new uses on the designated Project site would not result in impacts to the current circulation
system in the City at this time; thus, no impactswould occur.
b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
Chambers Group, File.
53
Initial Study for the Warehouse Discount Center
Project
No Impact. Section 15064.3(b) of the CEQA Guidelines describes criteria for analyzing transportation
impacts. The Project involves a zoning code amendment and development agreement amendment to
expand allowable uses within the Project site. Amending the existing land uses of a site could result in
impacts to transportation. However, the Project will not include new construction or new uses thatare not
compatible with the current zoning as it is an expansion of what is currently allowed. In addition, the Project
would not include activities that could generate additional circulation to the areasuch as the construction of
new buildings or residences. Current operations at the Project site will remain unchanged. Future
development in CPD zones in the City may result from the Project's zoningcode amendment, but impacts to
the City's circulation system and impacts to transportation resultingfrom these projects would be examined
by the City on a case-by-case basis. The proposed new uses on the designated Project site would not result
in impacts to the current circulation system in the Cityat this time; thus, no impacts would occur.
c) Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves
or dangerous intersections) or incompatible uses (e.g. farm equipment)?
No Impact. No ground disturbances or physical alterations of the Project site are proposed at this time, and
current operations at the Project site will remain unchanged. The Project does not currentlyinclude any
hazardous design features such as sharp curves or dangerous intersections; and is compatible with
surrounding uses, which are mainly industrial. Therefore, no impacts would occur.
d) Would the project result in inadequate emergency access?
No Impact. As mentioned above, no ground disturbance or physical alteration of the existing buildingon the
Project site is proposed at this time that would impede emergency access. Operations at the Project site
will remain unchanged. The Project site's emergency access would not be revised with theProject. Therefore,
no impacts would occur.
4.18 TRIBAL CULTURAL RESOURCES
Chambers Group, Inc. 43
54
TRIBAL CULTURAL RESOURCES.
Would the project cause a substantial adverse
change in the significance of a tribal cultural
Less than
resource, defined in Public Resources Code section
Potentially
Significant with
Less Than
18.
21074 as either a site, feature, place, cultural
Significant
Mitigation
Significant
No
landscape that is geographically defined in terms of
Impact
Incorporated
Impact
Impact
Impact
the size and scope of the landscape, sacred place, or
object with cultural value to a California
Native American tribe, and that is:
(a)
Listed or eligible for listing in the California Register of
Historical Resources, or in a local register of historical
❑
❑
❑
resources as defined in Public Resources
Code section 5020.1(k), or
(b)
A resource determined by the lead agency, in its
discretion and supported by substantial evidence, tobe
significant pursuant to criteria set forth in subdivision
(c) of Public Resources Code Section 5024.1. In
applying the criteria set forth in subdivision (c) of
❑
❑
❑
Public Resources Code Section 5024.1, the lead agency
shall consider thesignificance of the resource to a
California Native
American tribe.
Chambers Group, Inc. 43
54
Initial Study ffir the Warehouse Discount Center
Project
4.18.1 Impact Analysis
a) Would the project cause a substantial adverse change in the significance of a tribal cultural resource,
defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that
is geographically defined in terms of the size and scope of the landscape, sacred place, or object with
cultural value to a California Native American tribe, and that is Listed or eligible for listing in the
California Register of Historical Resources, or in a local register of historical resources as defined in
Public Resources Code section 5020.1(k)?
b) Would the project cause a substantial adverse change in the significance of a tribal cultural resource,
defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that
is geographically defined in terms of the size and scope of the landscape, sacred place, or object with
cultural value to a California Native American tribe, and that is a resource determined by the lead
agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria
set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in
subdivision (c) of Public Resources Code Section 5024. 1, the lead agency shall consider the significance
of the resource to a California Native American tribe?
No Impact. The Project involves a zoning code and development agreement amendment and does not
require any ground disturbances or physical alterations on the Project site that could disturb undiscovered
resources. Because the Project does not propose any ground -disturbing activities, no impacts would occur.
4.19 UTILITIES AND SERVICE SYSTEMS
Chambers Group, Inc. 44
55
Less than
UTILITIES/SERVICE SYSTEMS.
Potentially
Significant
Less Than
No
19.
Would the project:
Significant
with
Significant
Impact
Impact
Mitigation
Impact
Incorporated
(a)
Require or result in the relocation or construction of
new or expanded water, wastewater treatment or
storm water drainage, electric power, natural gas, or
❑
❑
❑
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
(b)
Have sufficient water supplies available to serve the
project and reasonably foreseeable future
❑
El
❑
development during normal, dry and multiple dry
years?
(c)
Result in a determination by the wastewater
treatment provider which serves or may serve the
project that it has adequate capacity to serve the
❑
❑
❑
project's projected demand in addition to the
provider's existing commitments?
(d)
Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
❑
❑
❑
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
(e)
Comply with federal, state, and local management
and reduction statutes and regulations related to
❑
❑
❑
solid wastes?
Chambers Group, Inc. 44
55
Initial Study for the Warehouse Discount Center
Project
4.19.1 Impact Analysis
a) Would the project require or result in the relocation or construction of new or expanded water,
wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications
facilities, the construction or expansion of which could cause significant environmental effects?
No Impact. The Project consists of a zoning code amendment and a development agreement amendment
to allow expanded uses in CPD zones. No alterations to the existing development on theProject site are
proposed, and utilities are currently operational. Operations on site would also remain unchanged.
Significant future redevelopment within the Project site and within the other CPD zones within the City
would be analyzed on a case-by-case basis if new or expanded utilities would be required. Therefore, the
Project would not result in relocation or construction of new or expanded utilities at the Project site, and
no impacts would occur.
b) Would the project have sufficient water supplies available to serve the project and reasonably
foreseeable future development during normal dry and multiple dry years?
No Impact. Approximately 80 percent of VCWWD's total water supply in 2019 came from the State Water
Project, and approximately 20 percent came from groundwater wells in the City. The State Water Project
transports water via the 444 -mile California Aqueduct to State Water Project contractors such as the
Metropolitan Water District of Southern California (MWD). MWD then delivers the water to its 26 -member
public agencies, including Calleguas Municipal Water District (CMWD), Ventura County's regional wholesale
purveyor and the VCWWD's direct supplier. VCWWD's2015 Urban Water Management Plan forecasts that
the MWD will have surplus water supply in bothsingle dry -year and multiple dry -year scenarios through
2040 (VCWWD 2016).
The Project consists of a zoning code amendment and a development agreement amendment to allow
expanded uses in CPD zones. No alterations to the existing development on the Project site are proposed,
and operations on site would remain the same. Water infrastructure and usage on site would not change
as a result of the Project; thus, no impacts would occur.
c) Would the project result in a determination by the wastewater treatment provider which serves or
may serve the project that it has adequate capacity to serve the project's projected demand in addition
to the provider's existing commitments?
No Impact. VCWSD operates and maintains water and wastewater infrastructure for the City, which is
located in VCWWD No. 1. The Moorpark Water Reclamation Facility (MWRF), located alongCalifornia SR-
118justwestof the City, serves the Project site. The MWRF currently receives an averageof 2.0 million gallons
per day (mgd) and is designed to treat up to 5.0 mgd (VCWWD 2016). The MWRFhas an available surplus
capacity of approximately 3.0 million gallons per day, which is sufficient to continue supporting the Project
because operations and wastewater infrastructure on the Project sitewould remain unchanged as a result
of the Project. Thus, no impacts would occur.
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of solid waste reduction goals?
Chambers Group, Inc. 45
56
Initial Siudy for the Warehouse Discount Cente,,
Project
e) Would the project comply with federal, state, and local management and reduction statutes and
regulations related to solid waste?
No Impact (d and e). The Project consists of a zoning code amendment and a development agreement
amendment. No alterations to the existing development on the Project site are proposed; therefore, no
ground disturbance or demolition resulting in solid waste would occur. Operations on the Projectsite would
continue unchanged, maintaining current compliance with State and local solid waste reduction goals. No
impacts regarding solid waste would occur.
4.20 WILDFIRE
4.20.1 Impact Analysis
a) Would the project impair an adopted emergency response plan or emergency evacuation plan?
No Impact. As discussed in Section 4.9 Hazards and Hazardous Materials, the City has developed an
Emergency Services Program. Additionally, the County's MHMP includes an overview of the risk assessment
process and identifies hazards present in the jurisdiction, hazard profiles, and vulnerability assessments.
According to CAL FIRE's Fire Hazard Severity Zone (FHSZ) Viewer, the Project is located outside the Very
High Fire Severity Zone (VHFSZ; CAL FIRE 2021). Further, the Project involves a zoning code amendment and
development agreement amendment and will not include any ground disturbances or new development
that could create a fire hazard. The Project would not interfere with the City's Emergency Services Program
or the MHMP because it would not prohibit subsequent programs or plans from being established or
prevent the goals and objectives of existing plans from being carried out. No impacts regarding an
emergency response or evacuation plan would occur.
Chambers Group, Inc.
57
Less than
WILDFIRE.
If located in or near state responsibility areas or
Potentially
Significant
Less Than
No
20
lands classified as very high fire hazard severity
Significant
with
Significant
Impact
zones, would the project:
Impact
Mitigation
Impact
Incorporated
(a)
Substantially impair an adopted emergency
❑
❑
response plan or emergency evacuation plan?
(b)
Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
El
Z
occupants to, pollutant concentrations from a
wildfire or the uncontrolled spread of a wildfire?
(c)
Require the installation or maintenance of associated
infrastructure (such as roads, fuel breaks, emergency
water sources, power lines or other utilities) that may
E]
❑
exacerbate fire risk or that may result in temporary
or ongoing impacts to the
environment?
(d)
Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post -fire slope
instability, or drainage changes?
4.20.1 Impact Analysis
a) Would the project impair an adopted emergency response plan or emergency evacuation plan?
No Impact. As discussed in Section 4.9 Hazards and Hazardous Materials, the City has developed an
Emergency Services Program. Additionally, the County's MHMP includes an overview of the risk assessment
process and identifies hazards present in the jurisdiction, hazard profiles, and vulnerability assessments.
According to CAL FIRE's Fire Hazard Severity Zone (FHSZ) Viewer, the Project is located outside the Very
High Fire Severity Zone (VHFSZ; CAL FIRE 2021). Further, the Project involves a zoning code amendment and
development agreement amendment and will not include any ground disturbances or new development
that could create a fire hazard. The Project would not interfere with the City's Emergency Services Program
or the MHMP because it would not prohibit subsequent programs or plans from being established or
prevent the goals and objectives of existing plans from being carried out. No impacts regarding an
emergency response or evacuation plan would occur.
Chambers Group, Inc.
57
Initial Study fi r the Warehouse Piscouw Cente
Project
b) Would the project, due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and
thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled
spread of a wildfire?
No Impact. The Project site is not located within CAL FIRE's designated VHFSZ, and the Project is in anarea
with minimal elevation change and steep slopes. The Project involves a zoning code amendmentand
development agreement amendment, which would not include any ground disturbance or physical
alteration of the Project site. Moreover, operations at the Project site would remain unchanged. The Project
would not exacerbate wildfire risks; therefore, no impacts would occur.
c) Would the project require the installation or maintenance of associated infrastructure (such as roads,
fuel breaks, emergency water sources, power lines, or other utilities) that may exacerbate fire risk or
that may result in temporary or ongoing impacts to the environment?
No Impact. The Project involves a zoning code amendment and development agreement amendment.The
Project would not include any ground disturbance or physical alteration of the existing site. The Project is
not located within the VHFSZ and use of the Project site would remain the same as currentuses on site.
Current infrastructure on site provides sufficient access to roads and utilities, and no newinfrastructure is
proposed. The Project would not exacerbate the risk of fire, and no impacts would occur.
d) Would the project expose people or structures to significant risks, including downslope or downstream
flooding or landslides, as a result of runoff, post -fire slope instability or drainage changes?
No Impact. The Project is not located within the VHFSZ and does not contain any slopes that pose a risk of
landslide or slope instability. The Project site is within an area of minimal elevation change; therefore, the
risk of downslope or downstream flooding is low. In addition, the Project would not include any ground
disturbance or physical alteration of the Project site that could result in increased runoff, post -fire slope
instability, or drainage changes. The Project would not expose people or structures to any increased risk of
flooding or landslide, and no impacts would occur.
4.21 MANDATORY FINDINGS OF SIGNIFICANCE
Chambers Group, Inc_ 47
58
Less than
Potentially
Significant
Less Than
21.
MANDATORY FINDINGS OF SIGNIFICANCE.
Significant
with
Significant
No
Impact
Mitigation
Impact
Impact
Incorporated
(a)
Does the project have the potential to substantially
degrade the quality of the environment, substantially
reduce the habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below self-
sustaining levels, threaten to eliminate a plant or
❑
El
❑
animal community, substantially reduce thenumberor
restrict the range of a rare or endangered plant or
animal or eliminate important examples of
he major periods of California history or prehistory?
Chambers Group, Inc_ 47
58
Inittal Study for the Warehouse Discount Center
I1rojeet
4.21.1 Impact Analysis
a) Does the project have the potential to substantially degrade the quality of the environment,
substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop
below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce
the number or restrict the range of a rare or endangered plant or animal or eliminate important
examples of the major periods of California history or prehistory?
No Impact. The Project site is located in an urbanized area of the City and has been previously disturbed in
conjunction with onsite development. No ground disturbances or physical alterations ofthe Project site are
proposed that could affect plant or animal communities, or subsurface archaeological and paleontological
resources. Thus, the Project does not pose any threat to degrade the quality of the environment. No impacts
to cultural resources or biological resources would resultfrom the Project.
b) Does the project have impacts that are individually limited, but cumulatively considerable?
("Cumulatively considerable" means that the incremental effects of a project are considerable when
viewed in connection with the effects of past projects, the effects of other current projects, and the
effects of probable future projects?)
Less than Significant Impact. The potential for cumulative impacts occurs when the independent impacts
of the Project are combined with the impact of related projects in proximity to the Project such that impacts
occur that are greater than the impacts of the Project alone. As discussed in Sections
4.1 to 4.20, it has been determined that the Project would either have no impact or impacts would beless
than significant with respect to the environmental issues.
Development along the CPD zones has been considered in the City's General Plan. The expanded usesof the
Project would allow additional services within these zones but would not introduce highly incompatible
uses that would result in potentially significant and cumulative impacts. Furthermore, new projects would
require compliance with the City's development guidelines and would be considered on a case-by-case
basis. Therefore, impacts would be less than significant.
c) Does the project have environmental effects which will cause substantial adverse effects on human
beings, either directly or indirectly?
Chambers Group, Inc. 48
59
Less than
Potentially
Significant
Less Than
21.
MANDATORY FINDINGS OF SIGNIFICANCE.
Significant
with
Significant
No
Impact
Mitigation
Impact
Impact
Incorporated
(b)
Does the project have impacts that are individually
limited, but cumulatively considerable?
("Cumulatively considerable' means that the
incremental effects of a project are considerablewhen
❑
viewed in connection with the effects of past projects,
he effects of other current projects, and
he effects of probable future projects?)
(c)
Does the project have environmental effects which
will cause substantial adverse effects on human
❑
❑
❑
beings, either directly or indirectly?
4.21.1 Impact Analysis
a) Does the project have the potential to substantially degrade the quality of the environment,
substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop
below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce
the number or restrict the range of a rare or endangered plant or animal or eliminate important
examples of the major periods of California history or prehistory?
No Impact. The Project site is located in an urbanized area of the City and has been previously disturbed in
conjunction with onsite development. No ground disturbances or physical alterations ofthe Project site are
proposed that could affect plant or animal communities, or subsurface archaeological and paleontological
resources. Thus, the Project does not pose any threat to degrade the quality of the environment. No impacts
to cultural resources or biological resources would resultfrom the Project.
b) Does the project have impacts that are individually limited, but cumulatively considerable?
("Cumulatively considerable" means that the incremental effects of a project are considerable when
viewed in connection with the effects of past projects, the effects of other current projects, and the
effects of probable future projects?)
Less than Significant Impact. The potential for cumulative impacts occurs when the independent impacts
of the Project are combined with the impact of related projects in proximity to the Project such that impacts
occur that are greater than the impacts of the Project alone. As discussed in Sections
4.1 to 4.20, it has been determined that the Project would either have no impact or impacts would beless
than significant with respect to the environmental issues.
Development along the CPD zones has been considered in the City's General Plan. The expanded usesof the
Project would allow additional services within these zones but would not introduce highly incompatible
uses that would result in potentially significant and cumulative impacts. Furthermore, new projects would
require compliance with the City's development guidelines and would be considered on a case-by-case
basis. Therefore, impacts would be less than significant.
c) Does the project have environmental effects which will cause substantial adverse effects on human
beings, either directly or indirectly?
Chambers Group, Inc. 48
59
Initial Study for the Warehouse Discount Center
Project
No Impact. Effects to human beings are generally associated with air quality, noise, traffic safety,
geology/soils, and hazards/hazardous materials. As discussed in Section 4.1 Air Quality, 4.7 Geology and
Soils, 4.9 Hazards and Hazardous Materials, 4.11 Noise, and 4.17 Transportation, the Project would not
result in significant impacts to human beings in the area. Adherence to regulatory codes, ordinances,
regulations, and standards listed in the document would ensure that Project operation would continue to
avoid substantial adverse direct or indirect effects on humans. No impacts to human beings would occur as
a result of the Project.
Chambers Group, Inc. 49
60
Initial Stardyfior the Warehouse Discount Cert=
Project
SECTION 5.0 — REFERENCES
Airport Land Use Commission (ALUC)
2000 Airport Comprehensive Land Use Plan for Ventura County. Available online at:
https://www.goventura.org/wp-content/uploads/2018/03/2000-airport-land-use-for- ventura-
county.pdf.
California Department of Forestry and Fire Protection Services (CAL FIRE)
2021 FHSZ Viewer, Accessed May 2021. Available online at: https://egis.fire.ca.gov/FHSZ/.
California Department of Transportation (Caltrans)
2019 List of eligible and officially designated State Scenic Highways (XLSX). Available online at:
https://dot.ca.gov/programs/design/lap-landscape-architecture-and-community- livability/lap-liv-i-scenic-
highways.
City of Moorpark (City)
1986 General Plan: Open Space, Conservation, and Recreation Element. Available online at:
https://www.moorparkca.gov/DocumentCenter/View/172/OSCAR-Element?bidld=.
1996 Environmental Impact Report for the Manufacturing Plan Facilities, and Commercial
Development Plan.
1998 General Plan: Noise Element. Available online at:
https://www.moorparkca.gov/DocumentCenter/View/171/Noise-Element?bidld=.
2001 General Plan: Safety Element. Available online at:
https://www.moorparkca.gov/DocumentCenter/View/173/Safety-Element?bidld=.
2020a Municipal Code. Accessed May 2021. Available online at:
httr)s://acode.us/codes/moorr)ark/.
2020b Zoning Map. Available online at:
https://moorparkca.gov/DocumentCenter/View/11472/Zoning-Map-updated- 09222020?bidld=
2021 Emergency Management. Available online at: https://moorparkca.gov/143/Emergency
Management
County of Ventura (County)
2015 Multi -Hazard Mitigation Plan. Available online at:
https://www.vcfloodi nfo.com/pdf/2015%20Ventura%20County%20Multi-
Hazard%20Mitigati on%20Plan%20and%20Append ices. pdf
2020 Background Report for the Ventura County 2040 General Plan. Available online at:
https://docs.vcrma.org/images/pdf/planning/plans/Background Report -
AII Sections - September 2020.pdf.
Chambers Group, Inc. tip
llutaui Study.Jor the Warehouse Discount Center
Project
DAUM Commercial Real Estate Services (DAUM)
2021 Property Highlights. Accessed May 2021. Available online at:
https://daumcommercial.com/property/14349-white-sage-road-moorpark-ca-93021/.
Department of Conservation (DOC)
2021a Department of Conservation, California Important Farmland Finder, Accessed May 2021.
Available online at: https://maps.conservation.ca.gov/DLRP/CIFF/.
2021b Department of Conservation, Earthquake Zones of Required Investigation, Accessed May2021.
Available online at: https://maps.conservation.ca.gov/cgs/EQZApp/app/.
2021c Geologic Map of California, Accessed May 2021. Available online at:
https://maps.conservation.ca.gov/cgs/gmc/.
Department of Toxic Substances Control
2021 Department of Toxic Substances Control, Envirostor, Accessed May 2021. Available online
at: https://www.envirostor.dtsc.ca.gov/public/.
Federal Transit Administration (FTA)
2018 Transit Noise and Vibration Impact Assessment Manual. Accessed May 2021. Available
online at: https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research-
innovation/118131/transit-noise-and-vibration-impact-assessment-manual-fta-report- no-0123_0.pdf.
Flood Emergency Management Act (FEMA)
2021 National Flood Hazard Layer Viewer, Accessed May 2021. Available online at:
https://hazards- fema.maps.arcgis.com/apps/webappviewer/index.html?id=8b0adb51996444d4879338
b5529aa9cd.
Google
2021 Google Maps, Accessed May 2021. Available online at: https://maps.google.com/.
State Water Resources Control Board (SWRCB)
2021 GeoTracker, Accessed May 2021. Available online at:
https://geotracker.waterboards.ca.gov/.
United States Department of Agriculture (USDA)
2015 Glossary of Soil Survey Terms. Available online at:
https://www.nres.usda.gov/wps/PA_N RCSConsumption/download?cid=nreseprd407891&ext=pdf
2021 Websoil Survey, Accessed May 2021. Available online at:
https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurveV.aspx.
United States Fish and Wildlife Service (USFWS)
2021a Critical Habitat for Threatened & Endangered Species, Accessed May 2021. Availableonline at:
Chambers (Troup, Inc.
62
Resolution No. PC -2021-665
Page 52
https://fws.maps.arcgis.com/home/webmap/viewer.htmI?webmap=9d8de5e26Sad4feO
9893cf75b8dbfb77.
2021b National Wetlands Inventory, Wetlands Mapper, Accessed May 2021. Available online at:
https://www.fws.gov/wetlands/data/`mapper.htm1.
Ventura County Air Quality Management District (VCAQMD)
2017 Final 2016 Ventura County Air Quality Management Plan. Available online at:
http://www.vcapcd.org/pubs/Planning/AQM P/2016/Final/Fina I-2016-Ventura-County-
AQM P.pdf.
Ventura County Waterworks District No. 1 (VCWWD)
2016 2015 Urban Water Management Plan. Available online at: https://s29422.pcdn.co/wp-
content/uploads/2018/03/2016-11-29-APPVD-FINAL-VCWWD-No-1-2015-Urban-Water-
Management-Plan.pdf.
63
Resolution No. PC -2021-665
Page 53
EXHIBIT B
DRAFT ZONING ORDINANCE AMENDMENT NO. 2021-02
AMENDMENT TO CHAPTERS 17.08 (DEFINITIONS) OF TITLE
17 (ZONING) OF THE MOORPARK MUNICIPAL CODE
Chapter 17.08 (Definitions) of Title 17 (Zoning) shall be amended to include the following
additional definitions, inserted with the existing definitions in alphabetical order:
"Motion picture and television production studio" shall mean a fixed place of business where
filming activities (motion or still photography) are regularly conducted upon the premises.
"Photography Studio" shall mean a fixed place of business where still photography activities are
regularly conducted upon the premises.
Table 17.20.060, Sections C and D of the Municipal Code shall be amended as shown
below wherein underline indicates added text:
Table 17.20.060
PERMITTED USES IN COMMERCIAL AND INDUSTRIAL ZONES
[Blank] = Not permitted
AP =
Administrative Permit
CUP
= Conditional Use Permit
NZC
= No Zoning Clearance required
TUP
= Temporary Use Permit
ZC =
Permitted by Zoning Clearance
64
CPD
C_
Zones
C -O
C-1
M-1
M-2
I
C-2
OT
A. Retail and Service Uses
1. Adult businesses when in compliance with
Sections 17.24.040(N), 17.78.050 and Chapter
ZC
ZC
5.18
2. Alcoholic beverage sales for off-site
consumption when in conjunction with another
city -approved retail or service use other than
automobile service station or liquor store
a. Beer and/or wine (*if within one hundred [100]
feet of a residentially zoned property a conditional
CUP
AP*
AP*
AP*
AP*
use permit is required)
64
Resolution No. PC -2021-665
Page 54
65
CPD
C_
Zones
C -O
C-1
M-1
M-2
I
C-2
OT
b. Beer, wine and other alcoholic beverages
CUP
CUP
CUP
CUP
CUP
3. Automobile/light truck/motorcycle
a. Brakes, oil changes, tires and shock sales and
installation, tune-ups and other light service and
repair (with or without hydraulic lifts) (*if within one
CUP
AP*
AP*
AP*
hundred [100] feet of a residentially zoned
property a conditional use permit is required)
b. Car washes, self-service or automatic with or
CUP
CUP
without automotive services stations
c. Engine rebuilding, transmission repair, steam
cleaning, auto body, painting
CUP
CUP
d. Parts and supplies
ZC
ZC
ZC
ZC
e. Rental
AP
AP
AP
f. Sales, with or without service and parts
CUP
CUP
CUP
g. Service stations with or without mini -marts and
with or without beer and wine sales for off-site
CUP
CUP
consumption
4. Body piercing and/or tattoo
CUP
5. Building supplies (*if within one hundred [100]
feet of a residentially zoned property a conditional
AP*
CUP
CUP
use permit is required)
6. Hay and feed sales
CUP
CUP
7. Hotels, motels and bed and breakfast inns
CUP
CUP
CUP
CUP
when in compliance with Chapter 5.44
8. Kennels and catteries
CUP
CUP
9. Liquor stores (when located no closer than one
thousand [1,000] feet of any other liquor store or
CUP
CUP
CUP
public or private school)
10. Commercial cannabis activity
11. Nurseries (retail) with or without container
grown plants when all equipment and supplies
AP
kept in an enclosed area
12. Nurseries (wholesale and/or retail) with or
without container grown plants when all
AP
equipment and supplies kept in an enclosed area
65
Resolution No. PC -2021-665
Page 55
66
CPD
C_
Zones
C -O
C-1
OT
M-1
M-2
I
C-2
13. Pawnshops when in compliance with Chapter
5.32
AP
14. Pest control services (*if within 100 feet of a
residentially zoned property a conditional use
AP*
AP*
permit is required)
15. Private post offices, parcel services, copy
centers
ZC
ZC
ZC
ZC
16. Psychics, fortunetelling, and spiritual advisors
when in compliance with Title 5 of the Moorpark
Municipal Code (*if within 100 feet of a
CUP
CUP
AP*
residentially zoned property a conditional use
permit is required)
17. Recreational vehicle storage yards when not
located on parcels adjacent to arterial roads or
freeways as shown on the Moorpark Circulation
CUP
Element Highway Network Map and with or
without a caretaker dwelling
18. Recycling centers
CUP
CUP
CUP
19. Recycling drop-off bins when located in an
area determined by the community development
ZC
ZC
ZC
ZC
ZC
ZC
director not to be in conflict with parking, vehicle
or pedestrian circulation
20. Rental and leasing of large equipment with or
without outdoor storage and repair (*if within one
hundred [100] feet of a residentially zoned
AP*
AP*
property a conditional use permit is required)
21. Retail shops and personal service
establishments, except as otherwise indicated in
this table, including, but not limited to, antiques,
art and craft dealers and supplies, bakeries,
barbers, beauty salons, bicycle sales/service,
books and stationery, camera/photo stores
ZC
ZC
ZC
including on-site processing, carpet and flooring
sales/ cleaning/installation, clothing and fabric
stores, computer sales and service, department
and variety stores, dry cleaners, electronic
equipment sales and service, florists, food
markets, gift and novelty stores, hardware and
66
Resolution No. PC -2021-665
Page 56
67
CPD
C-
Zones
C -O
C-1
OT
M-1
M-2
I
C-2
tool stores, home and office furniture and
equipment sales, home appliance sales and
service, housewares sales, jewelry stores, key
and locksmiths, music stores (including recorded
music and musical instrument sales, service, and
lessons), newsstands, paint stores, party supply
sales and rental, pet grooming, pet sales and
supplies, pharmacies, photography studios, pool
and spa sales and supplies, shoe stores, sporting
goods and equestrian supplies, small equipment
rental (no outdoor storage), toy and hobby stores,
video/DVD/CD sales and rental, wireless
sales/service, and uses which the community
development director determines to be similar
when in compliance with Section 17.20.030
22. Retail sales combined with limited distribution
and/or warehousing not exceeding 40% of gross
floor area of the building in which it is located (*if
AP*
within 100 feet of a residentially zoned property a
conditional use permit is required)
23. Retail sales in the M-1 and M-2 zone limited to
a maximum of 20% of the gross floor area of the
building in which it is located. In an industrial
complex the 20% shall be computed on the basis
AP
AP
of the cumulative total floor area of the industrial
planned development (IPD)
24. Retail sales (temporary) in the M-1 and M-2
zones. Issuance of a temporary use permit shall
TUP
TUP
take the place of a zoning clearance
25. Thrift stores, secondhand shops, consignment
stores when in compliance with Chapter 5.32
AP
AP
26. Tobacco sales
a. Retail smoking products stores, as defined in
Chapter 8.32
CUP
b. Sale of tobacco products and electronic
cigarette (vaping) products from retail
establishments other than retail smoking products
AP
AP
AP
AP
stores
67
Resolution No. PC -2021-665
Page 57
68
CPD
C_
Zones
C -O
C-1
M-1
M-2
I
C-2
OT
c. Smoking and vaping lounges where tobacco
and vaping products are sold for on-site
consumption (e.g., cigar lounges, hookah
lounges, vaping lounges) other than retail
smoking products stores
B. Eating and Drinking Places
1. Bars with or without entertainment including,
but not limited to, cocktail lounges, cabarets
CUP
CUP
CUP
CUP
2. Breweries, micro breweries, wineries/tasting
rooms with or without restaurant and with or
without outdoor seating and with or without
CUP
CUP
CUP
CUP
entertainment
3. Restaurants and similar establishments
engaged primarily in the retail sale of prepared
food for on-site or off-site consumption in
accordance with the restrictions below:
a. With or without entertainment and with or
without on-site consumption of beer and wine and
other alcoholic beverages and with or without
outdoor seating (*if within 100 feet of a
CUP
AP*
AP*
AP*
AP*
residentially zoned property a conditional use
permit is required)
b. With drive-in or drive-through facilities (sale of
alcoholic beverages from the drive-in or drive-
through facilities is prohibited) with or without
CUP
outdoor seating (Only permitted in the CPD Zone)
C. Office and Professional Uses
1. Financial services
a. Banks and other financial institutions, except
ZC
ZC
ZC
ZC
ZC
those set forth below
b. Check cashing, payday loan, and vehicle title
loan establishments (Only permitted in CPD
AP
Zone)
c. Automated/automatic teller machines (ATMs)
ZC
ZC
ZC
ZC
AP
2. Laboratories: research and scientific
AP
CUP'
AP
AP
68
Resolution No. PC -2021-665
Page 58
69
CPD
C_
Zones
C -O
C-1
OT
M-1
M-2
I
C-2
3. Professional and administrative offices,
including, but not limited to: accounting,
advertising agencies, chiropractic, collection
services; dental, direct mail marketing companies,
employment agencies, engineering services,
insurance, investment; medical, optical and
ZC
ZC
ZC
ZC
ZC
ZC
related health services; planning services, real
estate services; secretarial services, travel
agencies, and uses which the community
development director determines to be similar
when in compliance with Section 17.20.030
4. Veterinary offices and animal hospitals
a. Without boarding (keeping of animals indoors
and on-site for medical purposes shall not be
AP
AP
AP
AP
AP
AP
considered boarding)
b. With boarding indoors or outdoors
CUP
CUP
CUP
5. Massage establishments when in compliance
with Chapter 5.48 of the Moorpark Municipal
Code
a. Massage establishments with 4 or more
massage stations, or where 20% or more of the
floor area is dedicated to massage services (Only
CUP
permitted in the CPD Zone)
b. Massage establishments at day spas, salons,
or similar uses with 3 or fewer massage stations,
provided that less than 20% of the floor area is
ZC
ZC
ZC
ZC
dedicated to massage services
6. Motion picture and television production studio
CUP'
(and related activities and structures)
D. Manufacturing, Assembly, Distribution, and
Warehousing Uses
1. Cement, concrete and plaster, and product
fabrication
CUP
2. Distribution and transportation facilities
CUP
CUP
3. Heavy machinery repair, including trucks,
tractors and buses
CUP
69
Resolution No. PC -2021-665
Page 59
70
CPD
C_
Zones
C -O
C-1
OT
M-1
M-2
I
C-2
4. Manufacturing and assembly including, but not
CUP'
ZC*
ZC*
limited to, appliances, cabinets, cleaners, clothing,
computers, cosmetics, detergents, electronics,
furniture, leather products, machinery, medical
and scientific instruments, paper, perfumes,
pharmaceuticals, photographic and optical goods,
plastic products, signs and advertising displays,
soap, textiles and other uses which the
community development director determines to be
similar when in compliance with Section
17.20.030 (*if within 100 feet of a residentially
zoned property an administrative permit is
required)
5. Outdoor storage when in conjunction with a city
CUP
AP*
AP*
approved use and when all storage is screened
by an 8 -foot high masonry wall architecturally
matched to the structure (*if within 100 feet of a
residentially zoned property a conditional use
permit is required)
6. Self -storage or mini -storage when not located
CUP
CUP
on parcels adjacent to arterial roads or freeways
as shown on the Moorpark Circulation Element
Highway Network Map and with or without a
caretaker dwelling
7. Warehousing
CUP',z
AP
AP
8. Welding
AP
AP
E. Public and Semi -Public Uses
1. Amusement and recreational facilities as
defined in Chapter 17.08
a. Arcades (video and computer) and cyber cafes
CUP
CUP
CUP
b. Health clubs, gymnasiums, fitness centers, and
fitness studios for uses such as martial arts, yoga,
dance, and other similar uses or combination of
uses
i. up to 3,000 square feet
AP
I AP
I AP
I AP
70
Resolution No. PC -2021-665
Page 60
71
CPD
C_
Zones
C -O
C-1
M-1
M-2
I
C-2
OT
ii. over 3,000 square feet (*if within 100 feet of a
AP*
AP*
AP*
AP*
residentially zoned property a conditional use
permit is required)
c. Auditoriums, community centers, dancehalls,
CUP
CUP
CUP
CUP
CUP
and indoor motion picture theaters
d. Billiard and pool establishments, and bowling
CUP
CUP
alleys, with or without alcohol
2. Care facilities, including adult day care
CUP
CUP
CUP
facilities, Alzheimer's day care facilities,
congregate living health facilities, child day care
centers, community treatment facilities, foster
family and adoption agencies, hospices, long-term
health care facilities, residential care facilities for
the elderly, residential care facilities for persons
with chronic life-threatening illness, skilled nursing
and intermediate care facilities, social
rehabilitation facilities, and therapeutic day
services facilities
3. Emergency shelters in compliance with the
ZC*
requirements of Chapter 17.28 (*allowed in C-2
zone only, not permitted in CPD zone; emergency
shelters are also allowed in conjunction with
permitted places of religious assembly)
4. Single room occupancy unit development in
ZC*
compliance with the requirements of Chapter
17.28 (*allowed in C-2 zone only, not permitted in
CPD zone)
5. Clubhouses, social clubs, service clubs with or
CUP
CUP
without alcohol
6. Energy production from renewable resources
CUP
CUP
7. Governmental uses including, but not limited to,
CUP
CUP
CUP
CUP
CUP
CUP
CUP
city offices, community rooms, fire stations,
human service centers, libraries, police stations,
public utility facilities
8. Hospitals including urgent care (*if within one
CUP
AP*
AP*
AP*
hundred [100] feet of a residentially zoned
property a conditional use permit is required)
71
Resolution No. PC -2021-665
Page 61
72
CPD
C-
Zones
C -O
C-1
M -1
M-2
I
C-2
OT
9. Places of religious assembly, with or without
schools and/or social services, including
emergency shelters
i. up to 3,000 square feet
CUP
AP
AP
AP
AP
CUP
CUP
ii. over 3,000 square feet (*if within 100 feet of a
CUP
AP*
AP*
AP*
AP*
CUP
CUP
residentially zoned property a conditional use
permit is required)
10. Private education facilities including, but not
CUP
limited to, colleges and universities, elementary,
middle and high schools
11. Private training facilities including, but not
CUP
CUP
AP*
AP*
AP*
limited to, professional and vocational schools, art
and craft schools, music schools not part of a
music store, and driver training schools (*if within
100 feet of a residentially zoned property a
conditional use permit is required)
12. Recreational facilities (private), indoor or
AP*
AP*
CUP
outdoor, with or without food services, including,
but not limited to, batting cages, bicycle and skate
facilities, golf courses (including miniature golf
and driving ranges), and sports fields. Bicycles
and skate parks shall be in compliance with
Chapter 17.28 (*if within 100 feet of a residentially
zoned property a conditional use permit is
required)
13. Utility structures (electrical boxes,
AP
AP
AP
AP
AP
AP
AP
transformers and valve apparatus that have no
covered floor area and are attached to the ground
by poles, columns or pedestals shall not require a
zone clearance)
14. Wireless communications facilities, in
accordance with the requirements of Chapter
17.42
a. Major wireless communications facilities
CUP
CUP
CUP
CUP
CUP
CUP
CUP
b. Minor wireless communications facilities
AP
AP
AP
AP
AP
AP
AP
72
Resolution No. PC -2021-665
Page 62
1) Sites greater than eight (8) acres that are adjacent to both a freeway interchange and an arterial roadway as
identified in the circulation element and that are not adjacent to planned residential uses
2) With at least 10% of the floor area of the building dedicated to retail uses. Warehousing uses that will create a
point-of-sale allocation to the City of Moorpark and provide evidence of generating more than ten -million dollars
($10,000,000) in annual sales may dedicate less than 10% of the floor area to retail uses.)
73
CPD
C_
Zones
C -O
C-1
M-1
M-2
I
C-2
OT
c. Collocation wireless communications facilities
ZC
ZC
ZC
ZC
ZC
ZC
ZC
(consistent with definition of "collocation facility" in
Section 17.42.020)
F. Accessory and Miscellaneous Uses
1. Outdoor sales
CUP
CUP
CUP
CUP
CUP
CUP
2. Retail shops and services as listed in Table
AP
17.20.060(A)(21) when the uses are determined
by the community development director to be
ancillary to office use of the property
3. Temporary motion picture, television, or still
TUP
TUP
TUP
TUP
TUP
TUP
TUP
photography production (and related activities and
structures) in accordance with Section 17.28.120
4. Temporary uses including, but not limited to,
TUP
TUP
TUP
TUP
TUP
TUP
TUP
carnivals, Christmas tree sales, circuses,
festivals, sidewalk sales, special events, outdoor
sales, when in compliance with Chapter 17.44.
Issuance of a temporary use permit shall take the
place of a zoning clearance. Temporary uses
lasting more than 180 days require an AP
5. Drive-through facilities associated with
CUP
CUP
permitted uses in the zone other than eating and
drinking places (Not allowed in C-2 Zone)
1) Sites greater than eight (8) acres that are adjacent to both a freeway interchange and an arterial roadway as
identified in the circulation element and that are not adjacent to planned residential uses
2) With at least 10% of the floor area of the building dedicated to retail uses. Warehousing uses that will create a
point-of-sale allocation to the City of Moorpark and provide evidence of generating more than ten -million dollars
($10,000,000) in annual sales may dedicate less than 10% of the floor area to retail uses.)
73
Resolution No. PC -2021-665
Page 63
EXHIBIT C
DRAFT FIRST AMENDMENT TO DEVELOPMENT AGREEMENT NO. 2004-02
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
CITY CLERK
CITY OF MOORPARK
799 Moorpark Avenue
Moorpark, California 93021
EXEMPT FROM RECORDER'S FEES
Pursuant to Government Code §6103
FIRST AMENDMENT TO DEVELOPMENT AGREEMENT BY AND
BETWEEN THE CITY OF MOORPARK AND NLA 118, L.L.C.
(WAREHOUSE DISCOUNT CENTER)
THIS AGREEMENT SHALL BE RECORDED WITHIN TEN DAYS OF EXECUTION BY ALL PARTIES
HERETO PURSUANT TOTHE REQUIREMENTS OF GOVERNMENT CODE §65868.5
74
Resolution No. PC -2021-665
Page 64
FIRST AMENDMENT TO DEVELOPMENT AGREEMENT
BY AND BETWEEN THE CITY OF MOORPARK AND NLA
118, L.L.C. (WAREHOUSE DISCOUNT CENTER)
This First Amendment to the Development Agreement ("First Amendment") is
made and entered into on and is an amendment to that certain
Development Agreement ("Agreement") that was made and entered into on December
21, 2005, and recorded on January 6, 2006 by Instrument No. 20060106-0003983 by and
between the CITY OF MOORPARK, a municipal corporation (referred to hereinafter as
"City"), and NLA 118, L.L.C. (Warehouse Discount Center), a Delaware limited liability
company ("Developer"). City and Developer are referred to hereinafter individually as
"Party" and collectively as "Parties." In consideration of the mutual covenants and
agreements contained in this First Amendment to the Agreement, City and Developer
agree as follows:
Recitals. This First Amendment is made with respect to the following facts
and for the following purposes, each of which is acknowledged as true and
correct by the Parties:
a. Pursuant to Government Code Section 65864 et seq. and
Moorpark Municipal Code chapter 15.40, City is authorized to enter
into a binding contractual agreement with any person having a legal
or equitable interest in real property within its boundaries for the
development of such property in order to establish certainty in the
development process.
b. Developer is the owner of real property within the City generally
referred to as Commercial Planned Development 2004-3, Lot 1 of
Tract 5004 as more specifically described in Exhibit "A" attached
hereto (referred to hereinafter as the "Property").
C. The Parties entered into the Agreement with respect to the Property
on December 21, 2005, and the Agreement was recorded on January
6, 2006 by Instrument No. 20060106-0003983.
d. Prior to approval of the Agreement, City certified the Environmental
Impact Report prepared for the Special Devices Incorporated project
(SCH No. 1995071057), which adequately analyzed all potential
impacts of the project proposed under the Agreement.
e. On July 13, 2018, City and a related entity to Developer (NLA 14339,
LLC, a Delaware limited liability company), entered into an agreement
entitled "City Sign Agreement and Conditions, Covenants and
Restrictions," which agreement was recorded on July 25, 2018 by
Instrument No. 20180725-00085134-0, that permitted the erection of
75
Resolution No. PC -2021-665
Page 65
a four-sided tower structure for cellular telecommunications purposes
and which provided for the terms and conditions for the installation,
maintenance and replacement of a city identification sign on the
tower.
In order for Developer to better utilize the Property, as well as to
provide the opportunity for additional employment and revenue for
City, the Parties desire to amend the Agreement to expand the
allowable uses on the Property as specifically provided in this First
Amendment.
g. In connection with the processing and consideration of this First
Amendment, the Developer has applied for and the City has
processed a Zoning Code Text Amendment (Zone Ordinance
Amendment No. 2021-02) and related environmental document
required by the California Environmental Quality Act ("CEQA"), that
provides for certain laboratories, manufacturing, motion picture,
television and still photography production, and warehousing uses as
conditionally permitted uses in the Commercial Planned Development
(CPD) Zone.
On November 23, 2021, the Planning Commission of the City
commenced a duly noticed public hearing on the environmental
document, Zoning Ordinance Amendment No. 2021-02, and this First
Amendment, and at the conclusion of the hearing recommended
approval of the environmental document, Zoning Ordinance
Amendment No. 2021-02 and this First Amendment.
On December 15, 2021, the City Council
public hearing on the environmental do
Amendment No. 2021-02 and this Fir:
conclusion of the hearing, adopted Zor
No. 2021-02 by Ordnance No.
Amendment by Ordinance No. [XXXI.
commenced a duly noticed
;ument, Zoning Ordinance
t Amendment, and at the
ng Ordinance Amendment
and approved this First
2. Amendment of Section 4.1. Section 4.1 of the Agreement is amended as
follows:
4.1. Permitted Uses. The permitted and conditionally permitted uses of
the Property shall be limited to those that are allowed by the Project
Approvals and to the following uses as permitted by the City's General
Plan C-2 (General Commercial) Land Use Designation and the City's
Zoning Code designation (CPD (Commercial Planned Development) as
provided in Moorpark Municipal Code Section 17.20.060, as amended by
Zoning Ordinance Amendment No. 2021-02):
76
Resolution No. PC -2021-665
Page 66
4.1.a. Laboratories: research and scientific, upon the grant of a
conditional use permit.
4.1.b. Manufacturing and assembly including, but not limited to,
appliances, cabinets, cleaners, clothing, computers, cosmetics,
detergents, electronics, furniture, leather products, machinery,
medical and scientific instruments, paper, perfumes,
pharmaceuticals, photographic and optical goods, plastic products,
signs and advertising displays, soap, textiles and other uses which
the community development director determines to be similar when
in compliance with Section 17.20.030, upon the grant of a
conditional use permit.
4.1.c. Motion picture, television, or still photography production
(and related activities and structures), upon the grant of a
conditional use permit.
4.1.d. Warehousing, with at least 10% of the floor area of the
building dedicated to retail uses, upon the grant of a conditional use
permit.
3. Operative Date of First Amendment. This First Amendment shall become
operative on the date that Ordinance No. [XXXI that approves this First
Agreement becomes effective pursuant to Government Code Section
36937.
4. Authority. By their signatures below, the individuals signing on behalf of
Developer and City warrant that they have the authority to execute this
First Amendment on behalf of Developer and City, respectively.
5. Entire Agreement. The Development Agreement and this First
Amendment, contain the entire agreement between the Parties regarding
the subject matter hereof, and all prior agreements, understandings, oral or
written, are hereby merged herein, except that nothing contained herein is
intended to or shall abrogate, extinguish or supersede the City Sign
Agreement and Conditions, Covenants and Restrictions and any other City
land use entitlements or conditions imposed thereby that are applicable to
the development of the Property.
6. Except as amended herein, all other provisions of the Agreement shall
remain in full force and effect.
77
Resolution No. PC -2021-665
Page 67
IN WITNESS WHEREOF, the City of Moorpark and the Developer have executed
this First Amendment to the Development Agreement on the date first above written.
CITY OF MOORPARK
Janice S. Parvin
Mayor
OWNER/DEVELOPER
NLA 118, L.L.C.
Thomas J. Schlender
Its: President
By:
Shelley K. Schlender
Its: Secretary
ALL SIGNATURES MUST BE NOTARIZED
78
Resolution No. PC -2021-665
Page 68
A Notary Public or other officer completing this certificate verifies only the identity of the
individual who signed the document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
State of California
County of Ventura
On
, before me,
(insert name and title of the officer)
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) is/are subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their authorized capacity(ies), and that by
his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
certify under PENALTY OF PERJURY under the laws of the State of California
that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(Seal)
79
Resolution No. PC -2021-665
Page 69
A Notary Public or other officer completing this certificate verifies only the identity of the
individual who signed the document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
State of California
County of Ventura
On before me,
(insert name and title of the officer)
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) is/are subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their authorized capacity(ies), and that by
his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California
that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(Seal)
80
Resolution No. PC -2021-665
Page 70
A Notary Public or other officer completing this certificate verifies only the identity of the
individual who signed the document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
State of California
County of Ventura
On
, before me,
(insert name and title of the officer)
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) is/are subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their authorized capacity(ies), and that by
his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
certify under PENALTY OF PERJURY under the laws of the State of California
that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(Seal)
81
Ordinance No.
Page 71
EXHIBIT A
LEGAL DESCRIPTION OF PROPERTY
Lot 1 of Tract No. 5004, in the City of Moorpark, County of Ventura, State of California,
as per Map recorded in Book 137, Pages 97 to 102 inclusive of Miscellaneous Records
(Maps), and amended map of Tract No. 5004, recorded in Book 146, Pages 1 through 6
inclusive of Miscellaneous Records (Maps), in the Office of the County Recorder of said
county.
APN: 513- 0- 050- 205
82
Resolution No. PC -2021-665
Page 72
EXHIBIT B
DEPICTION OF PROPERTY
83
Resolution No. PC -2021-665
Page 73
EXHIBIT C
ADDRESSES OF PARTIES
To City:
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93021
Attn: City Manager
To Developer:
NLA 118, L.L.C. (Warehouse Discount Center)
30621 Canwood Street
Agoura Hills, CA 91301
Attn: President
84
Recording Requested By
And When Recorded Return to:
CITY CLERK
CITY OF MOORPARK
799 Moorpark Avenue
Moorpark, California 93021
EXEMPT FROM RECORDER'S FEES
Pursuant to Government Code
§ 6103
DEVELOPMENT AGREEMENT
BY AND BETWEEN
THE CITY OF MOORPARK
AND
NLA 118, L.L.C.
(WAREHOUSE DISCOUNT CENTER)
-I-
PC Attachment 2 85
THIS AGREEMENT SHALL BE RECORDED WITHIN TEN DAYS
OF EXECUTION BY ALL PARTIES HERETO PURSUANT TO
THE REQUIREMENTS OF GOVERNMENT CODE §65868.5
DEVELOPMENT AGREEMENT
This Development Agreement ("the Agreement") is made and
entered into on, by and between the CITY OF MOORPARK, a
municipal corporation, (referred to hereinafter as "City")
and NLA 118, L.L.C. (Warehouse Discount Center), the owner
of real property within the City of Moorpark generally
referred to as Commercial Planned Development 2004-03, Lot
1 of Tract 5004 (referred to hereinafter individually as
"Developer"). City and Developer are referred to
hereinafter individually as "Party" and collectively as
"Parties." In consideration of the mutual covenants and
agreements contained in this Agreement, City and Developer
agree as follows:
1. Recitals. This Agreement is made with respect to the
following facts and for the following purposes, each of
which is acknowledged as true and correct by the Parties:
1.1. Pursuant to Government Code Section 65864 et seq.
and Moorpark Municipal Code chapter 15.40, City is
authorized to enter into a binding contractual
agreement with any person having a legal or
equitable interest in real property within its
boundaries for the development of such property in
order to establish certainty in the development
process.
1.2. Prior to approval of this Agreement the City
Council of City ("the City Council") approved
General Plan Amendment No. 2004-04 ("GPA 2004-04"),
for approximately 8.15 acres of land within the
City ("the Property"), as more specifically
described in Exhibit "A" attached hereto and
incorporated herein.
1.3. Conditional Use Permit 2005-04 (CUP 2005-04) and
Commercial Planned Development Permit No. 2004-03
(CPD 2004-03) [collectively "the Project
Approvals"; individually "a Project Approval"]
-2-
86
provides for the development of the Property and
the construction of certain off-site improvements
in connection therewith ("the Project").
1.4. By this Agreement, City desires to obtain the
binding agreement of Developer to develop the
Property in accordance with the Project Approvals
and this Agreement. In consideration thereof, City
agrees to limit the future exercise of certain of
its governmental and proprietary powers to the
extent specified in this Agreement.
1.5. By this Agreement, Developer desires to obtain the
binding agreement of City to permit the development
of the Property in accordance with the Project
Approvals and this Agreement. Developer
anticipates developing the Property over a maximum
of two (2) years. In consideration thereof,
Developer agrees to waive its rights to legally
challenge the limitations and conditions imposed
upon the development of the Property pursuant to
the Project Approvals and this Agreement and to
provide the public benefits and improvements
specified in this Agreement.
1.6. City and Developer acknowledge and agree that the
consideration that is to be exchanged pursuant to
this Agreement is fair, just and reasonable and
that this Agreement is consistent with the General
Plan of City, as amended by GPA 2004-04.
1.7 City and Developer acknowledge and agree that the
provisions of the Development Agreement adopted
through Ordinance 220 for the Special Devices,
Incorporated project will continue to be met,
unless modified by this Agreement as long as the
Development Agreement adopted by Ordinance remains
in effect.
1.8. On September 27, 2005, the Planning Commission of
City commenced a duly noticed public hearing on
this Agreement, and at the conclusion of the
hearing recommended approval of the Agreement.
1.9. On, October 5, 2005 the City Council commenced a
duly noticed public hearing on this Agreement, and
at the conclusion of the hearing on October 5, 2005
-3-
87
approved the Agreement by Ordinance No. 322
("the Enabling Ordinance").
2. Property Subject To This Agreement. All of the Property
shall be subject to this Agreement. The Property may
also be referred to hereinafter as "the site" or "the
Project".
3. Binding Effect. The burdens of this Agreement are
binding upon, and the benefits of the Agreement inure to,
each Party and each successive successor in interest
thereto and constitute covenants that run with the
Property. Whenever the terms "City" and "Developer" are
used herein, such terms shall include every -successive
successor in interest thereto, except that the term
"Developer" shall not include the purchaser or transferee
of any lot within the Project that has been fully
developed in accordance with the Project Approvals and
this Agreement.
3.1. Constructive Notice and Acceptance. Every person
who acquires any right, title or interest in or to
any portion of the Property in which a Developer
has a legal interest is, and shall be., conclusively
deemed to have consented and agreed to be bound by
this Agreement, whether or not any reference to the
Agreement is contained in the instrument by which
such person acquired such right, title or interest.
3.2. Release Upon Transfer. Upon the sale or transfer
of any of Developer's interest in any portion of
the Property, that Developer shall be released from
its obligations with respect to the portion so sold
or transferred subsequent to the operative date of
the sale or transfer, provided that the Developer
(i) was not in breach of this Agreement at the time
of the sale or transfer and (ii) prior to the sale
or transfer, delivered to City a written assumption
agreement, duly executed by the purchaser or
transferee and notarized by a notary public,
whereby the purchaser or transferee expressly
assumes the obligations of Developer under this
Agreement with respect to the sold or transferred
portion of the Property. Failure to provide a
written assumption agreement hereunder shall not
negate, modify or otherwise affect the liability of
the purchaser or transferee pursuant to this
-4-
a$
Agreement. Nothing contained herein shall be
deemed to grant to City discretion to approve or
deny any such sale or transfer, except as otherwise
expressly provided in this Agreement.
4. Development of the Property. The following provisions
shall govern the development and use of the Property.
4.1. Permitted Uses. The permitted and conditionally
permitted uses of the Property shall be limited to
those that are allowed by the Project Approvals and
this Agreement.
4.2. Development Standards. All design and development
standards, including but not limited to density or
intensity of use and maximum height and size of
buildings, that shall be applicable to the Property
are set forth in the Project Approvals and this
Agreement,
4.3. Building Standards. All construction on the
Property shall adhere to the Uniform Building Code,
including the Fire Resistive Design Manual, the
National Electrical Code, the Uniform Plumbing
Code, the Uniform Mechanical Code, the Uniform
Housing Code, the Uniform Code for the Abatement of
Dangerous Buildings, the Uniform Code for Building
Conservation and the Uniform Administrative Code in
effect at the time the plan check or permit is
approved and to any federal or state building
requirements that are then in effect' (collectively
"the Building Codes").
4.4. Reservations and Dedications. All reservations and
dedications of land for public purposes that are
applicable to the Property are set forth in the
Project Approvals and this Agreement.
5. Vesting of Development Rights.
5.1. Timing of Development. In Pardee Construction Co.
v. City of Camarillo, 37 Cal. 3d 465 (1984), the
California Supreme Court held that the failure of
the parties therein to provide for the timing or
rate of development resulted in a later -adopted
initiative restricting the rate of development to
prevail against the parties' agreement. City and
-5-
89
Developer intend to avoid the result in Pardee by
acknowledging and providing that Developer shall
have the right, without obligation, to develop the
Property in such order and at such rate and times
as Developer deems appropriate within the exercise
of its subjective business judgment.
In furtherance of the Parties intent, as set forth
in this subsection, no future amendment of any
existing City ordinance or resolution, or future
adoption of any ordinance, resolution or other
action, that purports to limit the rate or timing
of development over time or alter the sequencing of
development phases, whether adopted or imposed by
the City Council or through the initiative or
referendum process, shall apply to the Property
provided the Property is developed in accordance
with the Project Approvals and this Agreement.
Nothing in this subsection shall be construed to
limit City's right to insure that Developer timely
provides all infrastructure required by the Project
Approvals, Subsequent Approvals, and this
Agreement.
5.2. Amendment of Project Approvals. No amendment of
any of the Project Approvals, whether adopted or
approved by the City Council or through the
initiative or referendum process, shall apply to
any portion of the Property, unless the Developer
has agreed in writing to the amendment.
5.3. Issuance of Subsequent Approvals. Applications for
land use approvals, entitlements and permits,
including without limitation subdivision maps (e.g.
tentative, vesting tentative, parcel, vesting
parcel, and final maps), subdivision improvement
agreements and other agreements relating to the
Project, lot line adjustments, preliminary and
final planned development permits, use permits,
design review approvals (e.g. site plans,
architectural plans and landscaping plans),
encroachment permits, and sewer and water
connections that are necessary to or desirable for
the development of the Project (collectively "the
Subsequent Approvals"; individually "a Subsequent
Approval") shall be consistent with the Project
Approvals and this Agreement. For purposes of this
I.
90
Agreement, Subsequent Approvals do not include
building permits.
Subsequent Approvals shall be governed by the
Project Approvals and by the applicable provisions
of the Moorpark General Plan, the Moorpark
Municipal Code and other City ordinances,
resolutions, rules, regulations, policies,
standards and requirements as most recently adopted
or approved by the City Council or through the
initiative or referendum process and in effect at
the time that the application for the Subsequent
Approval is deemed complete by City (collectively
"City Laws"), except City Laws that:
(a) change any permitted or conditionally permitted
uses of the Property from what is allowed by the
Project Approvals;
(b) limit or reduce the density or intensity of the
Project, or any part thereof, or otherwise require
any reduction in the number of proposed buildings
or other improvements from what is allowed by the
Project Approvals.
(c) limit or control the rate, timing, phasing or
sequencing of the approval, development or
construction of all or any part of the Project in
any manner, provided that all infrastructure
required by the Project Approvals to serve the
portion of the Property covered by the Subsequent
Approval is in place or is scheduled to be in place
prior to completion of construction;
(d) are not uniformly applied on a City-wide basis
to all substantially similar types of development
projects or to all properties with similar land use
designations;
(e) control residential rents;
(f) prohibit or regulate development on slopes with
grades greater than 20 percent, including without
limitation Moorpark Municipal Code Chapter 17.38 or
any successor thereto, within the Property; or
_7-
91
(g) modify the land use from what is permitted by
the City's General Plan Land Use Element at the
operative date of this Agreement or that prohibits
or restricts the establishment or expansion of
urban services including but not limited to
community sewer systems to the Project.
5.4. Term of Subsequent Approvals. The term of any
tentative map for the Property, or any portion
thereof, shall expire ten (10) years after its
approval or conditional approval or upon the
expiration or earlier termination of this
Agreement, whichever occurs first, notwithstanding
the provisions of Government Code Section
66452.6(a) or the fact that the final map may be
filed in phases. Developer hereby waives any right
that it may have under the Subdivision Map Act,
Government Code Section 66410 et seq., or any
successor thereto, to apply for an extension of the
time at which the tentative map expires pursuant to
this subsection. No portion of the Property for
which a final map or parcel map has been recorded
shall be reverted to acreage at the initiative of
City during the term of this Agreement.
The term of any Subsequent Approval, except a
tentative map or subdivision improvement or other
agreements relating to the Project, shall be one
year; provided that the term may be extended by the
decision maker for two (2) additional one (1) year
periods upon application of the Developer holding
the Subsequent Approval filed with City's
Department of Community Development prior to the
expiration of that Approval. Each such Subsequent
Approval shall be deemed inaugurated, and no
extension shall be necessary, if a building permit
was issued and the foundation received final
inspection by City's Building Inspector prior to
the expiration of that Approval.
It is understood by City and Developer that certain
Subsequent Approvals may not remain valid for the
term of this Agreement.. Accordingly, throughout the
term of this Agreement, any Developer shall have
the right, at its election, to apply for a new
permit to replace a permit that has expired or is
about to expire.
WE
92
5.5. Modification of Approvals. Throughout the term of
this Agreement, Developer shall have the right, at
its election and without risk to or waiver of any
right that is vested in it pursuant to this
section, to apply to City for modifications to
Project Approvals and Subsequent Approvals. The
approval or conditional approval of any such
modification shall not require an amendment to this
Agreement, provided that, in addition to any other
findings that may be required in order to approve
or conditionally approve the modification, a
finding is made that the modification is consistent
with this Agreement.
5.6. Issuance of Building Permits. No building permit,
final inspection or certificate of occupancy will
be unreasonably withheld from Developer if all
infrastructure required by the Project Approvals,
Subsequent Approvals, and this Agreement to serve
the portion of the Property covered by the building
permit is in place or is scheduled to be in place
prior to completion of construction and all of the
other relevant provisions of the Project Approvals,
Subsequent Approvals and this Agreement have been
satisfied. Consistent with subsection 5.1 of this
Agreement, in no event shall building permits be
allocated on any annual numerical basis or on any
arbitrary allocation basis.
5.7. Moratorium on Development. Nothing in this
Agreement shall prevent City, whether by the City
Council or through the initiative or referendum
process, from adopting or imposing a moratorium on
the processing and issuance of Subsequent Approvals
and building permits and on the finalizing of
building permits by means of a final inspection or
certificate of occupancy, provided that the
moratorium is adopted or imposed (i) on a City-wide
basis to all substantially similar types of
development projects and properties with similar
land use designations and (ii) as a result of a
utility shortage or a reasonably foreseeable
utility shortage, including without limitation a
shortage of water, sewer treatment capacity,
electricity or natural gas.
-9-
93
6. Developer Agreements.
6.1. Developer shall comply with (i) this Agreement,
(ii) the Project Approvals, (iii) all Subsequent
Approvals for which it was the applicant or a
successor in interest to the applicant and (iv) the
MMRP of the previously certified EIR for the
Special Devices Incorporated project and any
subsequent or supplemental environmental actions.
6.2. All lands and interests in land dedicated to City
shall be free and clear of liens and encumbrances
other than easements or restrictions that do not
preclude or interfere with use of the land or
interest for its intended purpose, as reasonably
determined by City.
6.3. As a condition of the issuance of a building permit
for each commercial or institutional use within the
boundaries of the Property, Developer shall pay
City a development fee as described herein (the
"Development Fee") The Development Fee may be
expended by City in its sole and unfettered
discretion. On the operative date of this
Agreement, the amount of the Development Fee shall
be Forty Thousand Twenty -Eight Dollars ($40,028.00)
per gross acre of commercial or institutional land
on which the commercial or institutional use is
located. The fee shall be adjusted annually
commencing one (1) year after the first building
permit is issued within CPD 2004-03 by any increase
in the Consumer Price Index (CPI) until all fees
have been paid. The CPI increase shall be
determined by using the information provided by the
U.S. Department of Labor, Bureau of Labor
Statistics, for all urban consumers within the Los
Angeles/Anaheim/Riverside metropolitan area during
the prior year. The calculation shall be made
using the month which is four (4) months prior to
the month in which the first building permit is
issued within CPD 2004-03 (e.g., if the permit
issuance occurs in October, then the month of June
is used to calculate the increase). In the event
there is a decrease in the referenced Index for any
annual indexing, the Development Fee shall remain
at its then current amount until such time as the
MUM
94
next subsequent annual indexing which results in an
increase.
6.4. As a condition of the issuance of a building permit
for each commercial or institutional use within the
boundaries of the Property, Developer shall pay
City a traffic mitigation fee as described herein
("Citywide Traffic Fee"). The Citywide Traffic Fee
may be expended by City in its sole and unfettered
discretion. On the operative date of this
Agreement, the amount of the Citywide Traffic Fee
shall be Twenty -Two Thousand, Eight Hundred Thirty -
Eight Dollars ($22,838.00) per acre of commercial
or institutional land on which the commercial or
institutional use is located. Commencing on
January 1, 2006, and annually thereafter, the
contribution amount shall be increased to reflect
the change in the Caltrans Highway Bid Price Index
for Selected California Construction Items for the
twelve (12) month period available on December 31
of the preceding year ("annual indexing"). In the
event there is a decrease in the referenced Index
for any annual indexing, the current amount of the
fee shall remain until such time as the next
subsequent annual indexing which results in an
increase.
In the event the Caltrans Highway Bid Price Index
is discontinued or revised, such successor index
with which it is replaced shall be used in order to
obtain substantially the same result as would
otherwise have been obtained if the index had not
been discontinued or revised.
6.5. On the operative date of this Agreement, Developer
shall pay all outstanding City processing costs
related to preparation of this Agreement and
Project Approvals.
6.6. Prior to the issuance of the building permit for
each commercial or institutional building within
the Property, Developer shall pay a fee for
acquisition of parkland and related improvements
(Park Fee). On the operative date of this
Agreement, the amount of the Park Fee shall be
Fifty Cents ($.50) per square foot of each building
used for commercial or institutional purposes
-11-
95
within the Property. The fee shall be adjusted
annually commencing one (1) year after the first
commercial or institutional building permit is
issued within CPD 2004-03 by any increase in the
Consumer Price Index (CPI) until all fees have been
paid. The CPI increase shall be determined by
using the information provided by the U.S.
Department of Labor, Bureau of Labor Statistics,
for all urban consumers within the Los
Angeles/Anaheim/Riverside metropolitan area during
the prior year. The calculation shall be made
using the month which is four (4) months prior to
the month in which the first commercial or
institutional building permit is issued within CPD
2004-03 (e.g., if the permit issuance occurs in
October, then the month of June is used to
calculate the increase). In the event there is a
decrease in the referenced Index for any annual
indexing, the Park Fee shall remain at its then
current amount until such time as the next
subsequent annual indexing which results in an
increase.
6.7. Developer agrees, after approval of landscaping and
irrigation plans by the City, at its sole cost and
expense, to landscape and maintain those areas
under the freeway bridge along the north and south
sides of New Los Angeles Avenue; the area on the
north side of New Los Angeles Avenue along the
entire reach of the Caltrans right-of-way, and the
Caltrans right-of-way along the southern boundary
of the site. Said landscaping shall be installed
prior to the occupancy of the first commercial or
institutional building and to be designed and
installed to the satisfaction of the Community
Development Director and the City Engineer. If
approved by Caltrans, the developer shall remove
the existing chainlink fencing at the top of the
slope and install a six foot (6') high decorative
tubular steel fence with block pilasters.
Developer agrees to landscape and maintain, at its
sole cost and expense, the Caltrans right-of-way
along the southern boundary of the site. If
approved by Caltrans the developer shall remove the
existing chainlink fencing and install a six (6)
-12-
DZ1
foot high decorative tubular steel fence with block
pilasters at the top of the slope.
6.$. Developer warrants that the total gross taxable
sales in the first year of operation will be Seven
Million Dollars ($7,000,000.00) per annum, in the
second year of operation the total gross taxable
sales will be Eight Million Dollars
($6,000,000.00), in the third year of operation the
total gross taxable sales will be Mine Million
Dollars {$9,000,000.00}, in the fourth, fifth,
sixth, seventh, eighth, ninth and tenth year of
operation the total gross taxable sales will be Ten
Million Dollars ($10,000,000.00) for each year.
The first year shall start twelve (12) months after
the date of initial occupancy of Warehouse Discount
Center, including conditional occupancy, which
allows for the operation of Warehouse Discount
Center. For example if initial occupancy occurs on
February 1, 2006 the first year shall start on
February 1, 2007. If the date of initial occupancy
does not start on the first day of a calendar
month, then for purposes of this section, the first
month of the twelve (12) month period shall be on
the first day of the following month. For example,
if initial occupancy occurs on February 3, 2007,
the start date of the monthly fee calculation shall
be March 1, 2007.
Should the annual total gross taxable sales from
the Warehouse Discount Center not reach the annual
amount for any year in the first ten years of
operation the Developer shall pay the City the
difference in total gross taxable sales times
0.0075 (e.g., if the gross receipts in the first
year are $6,000,000.00 instead of $7,000,000.00
then Developer would pay City $7,500.00
($1,000,000.00 x .0075). This fee shall be paid
for each year that the total gross taxable sales
are not met. The fee shall be paid monthly in
twelve (12) equal installments in the year
following the shortfall. This fee may be expended
by the City in its sole and unfettered discretion.
If in any year the gross taxable sales exceeds the
established annual amount the Developer will be
given a credit against future annual gross taxable
sales, on a dollar for dollar basis until such
-13-
97
credit amount is used to offset a shortfall in any
subsequent year.
6.9. Developer agrees to pay to City an air quality
mitigation fee, as described herein (Air Quality
Fee) of Sixty Six Thousand Dollars ($66,000.00), in
satisfaction of the Transportation Demand
Management Fund mitigation requirement for the
Project. The Air Quality Fee may be expended by
City in its sole discretion for reduction of
regional air pollution emissions and to mitigate
residual Project air quality impacts.
At the time the Fee is due, City may at its sole
discretion require Developer to purchase equipment,
vehicles, or other items, contract and pay for
services, or make improvements for which Developer
shall receive equivalent credit against Air Quality
Fee payments or refund of previous payments.
The fee shall be paid prior to the occupancy of the
first building. Commencing on January 1, 2006, and
annually thereafter the Air Quality Fee shall be
adjusted by any increase in the Consumer Price
Index (CPI) until all fees have been 'paid. The CPI
increase shall be determined by using the
information provided by the U.S. Department of
Labor, Bureau of Labor Statistics, for all urban
consumers within the Los Angeles/Anaheim/Riverside
metropolitan area during the prior year. The
calculation shall be made using the month of
December over the prior month of December. In the
event there is a decrease in the CPI for any annual
indexing, the fee shall remain at its then current
amount until such time as the next subsequent
annual indexing which results in an increase.
6.10. Developer shall provide an easement to the City for
a City Welcome Sign on the Project site at a
location satisfactory to the Community Development
Director. The easement shall provide for the
location and maintenance of the sign. Developer
agrees to pay $25,000 to the City for the
construction and erection of the sign. The funds
may be expended by City in its sole and unfettered
discretion. The fee shall be paid prior to
occupancy of the first commercial or institutional
-14-
98
building. Developer agrees that design of the
sign, including the lighting, shall be at the
City's sole discretion.
6.11. Developer agrees to cast affirmative ballots for
the formation of one or more assessment districts
and levying of assessments, for the maintenance of
parkway and median landscaping, street lighting,
including but not limited to all water and
electricity costs, and if requested by the City
Council, parks for the provision of special
benefits conferred by same upon properties within
the Project. Developer further agrees to form one
or more property owner associations and to obligate
said associations to provide for maintenance of
parkway and median landscaping, street lighting,
and if requested by the City Council, parks in the
event the aforementioned assessment district is
dissolved or altered in any way or assessments are
reduced or limited in any way by a ballot election
of property owners, or if the assessment district
is invalidated by court action. Prior to occupancy
of the first building for the Property, if required
by City at its sole discretion, Developer shall
also form one or more property owner associations
to assume ownership and maintenance of open space
land, trails, storm water detention and/or debris
basins and related drainage facilities, landscaping
(including landscaping within Caltrans rights-of-
way), and other amenities, and to comply with the
National Pollutant Discharge Elimination System
(NPDES) requirements of the Project. The obligation
of said property owner association shall be more
specifically defined in the conditions of approval
of Commercial Planned Development 2004-03.
6.12. In addition to fees specifically mentioned in this
Agreement, Developer agrees to pay all City capital
improvement, development, and processing fees at
the rate and amount in effect at the time the fee
is required to be paid. Said fees include but are
not limited to Library Facilities Fees, Police
Facilities Fees, Fire Facilities Fees, drainage,
entitlement processing fees, and plan check and
permit fees for buildings and public improvements.
Developer further agrees that unless specifically
exempted by this Agreement, it is subject to all
-15-
99
fees imposed by City at the operative date of this
Agreement and such future fees imposed as
determined by City in its sole discretion so long
as said fee is imposed on similarly situated
properties.
6.13. Developer shall pay the Los Angeles Avenue Area of
Contribution (AOC) fee for each commercial and
institutional use prior to the issuance of a
building permit for each use. The AOC fee shall be
the dollar amount in effect at the time of issuance
of the building permit for each commercial or
institutional use.
6.14. Developer agrees that any fees and payments
pursuant to this Agreement shall be made without
reservation, and Developer expressly waives the
right to payment of any such fees under protest
pursuant to California Government Code Section
66020 and statutes amendatory or supplementary
thereto. Developer further agrees that the fees it
has agreed to pay pursuant to subsections 6.3 and
6.6 of this Agreement are not public improvement
fees collected pursuant to Government Code Section
66006 and statutes amendatory or supplementary
thereto and that for purposes of Government Code
Section 65865(e) and statutes amendatory or
supplementary thereto.
6.15. Developer agrees to comply with Section 15.40.150
of the Moorpark Municipal Code and any provisions
amendatory or supplementary thereto for annual
review of this Agreement and further agrees that
the annual review shall include evaluation of its
compliance with the previously certified EIR for
the SDI project and approved MMRP.
6.16. Developer agrees that any election to acquire
property by eminent domain shall be at City's sole
discretion, and only after compliance with all
legally required procedures including but not
limited to a hearing on a proposed resolution of
necessity.
-16-
100
7. City Agreements.
7.1. City shall commit reasonable time and resources of
City staff to work with Developer on the expedited
and parallel processing of applications for
Subsequent Approvals for the Project area and shall
use overtime and independent contractors whenever
possible. Developer shall assume any risk related
to, and shall pay the additional costs incurred by
City for, the expedited and parallel processing.
7.2. If requested in writing by Developer and limited to
City's legal authority, City at its sole discretion
shall proceed to acquire, at Developer's sole cost
and expense, easements or fee title to land in
which Developer does not have title or interest in
order to allow construction of public improvements
required of Developer including any land which is
outside City's legal boundaries. The process shall
generally follow Government Code Section 66462.5 et
sec. and shall include the obligation of Developer
to enter into an agreement with City, guaranteed by
cash deposits and other security as the City may
require, to pay all City costs including but not
limited to, acquisition of the interest, attorney
fees, appraisal fees, engineering fees, City staff
costs, and City overhead expenses of fifteen
percent (150) on all out-of-pocket costs.
7.3. The City Manager is authorized to sign an early
grading agreement on behalf of City to allow rough
grading of the Project prior to completion of all
condition compliance requirements. Said early
grading agreement shall be consistent with the
conditions of approval for CPD 2004-03 and
contingent on City Engineer and Community
Development Director acceptance of a Performance
Bond in a form and amount satisfactory to them to
guarantee implementation of the erosion control
plan and completion of the rough grading and
construction of on-site and off-site improvements.
In the case of failure to comply with the terms and
conditions of the early grading agreement, the City
Council may by resolution declare the surety
forfeited.
-17-
101
7.4. City agrees that whenever possible as determined by
City in its sole discretion to process concurrently
all land use entitlements for the same property so
long as said entitlements are deemed complete.
7.5. City shall facilitate the reimbursement to
Developer of any costs incurred by Developer that
may be subject to partial reimbursement from other
developers as a condition of approval of a
development permit or development agreement with
one or more other developers.
8.
Supersession of Agreement by Change of Law. In the event
that any state or federal law or regulation enacted after
the date the Enabling Ordinance was adopted by the City
Council prevents or precludes compliance with any
provision of the Agreement, such provision shall be
deemed modified or suspended to comply with such state or
federal law or regulation, as reasonably determined
necessary by City.
9. Demonstration of Good Faith Compliance. In order to
ascertain compliance by Developer with the provisions of
this Agreement, the Agreement shall be reviewed annually
in accordance with Moorpark Municipal Code Chapter 15.40.
of City or any successor thereof then in effect. The
failure of City to conduct any such annual review shall
not, in any manner, constitute a breach of this Agreement
by City, diminish, impede, or abrogate the obligations of
Developer hereunder or render this Agreement invalid or
void. At the same time as the referenced annual review,
City shall also review Developer's compliance with the
MMRP.
10. Authorized Delays. Performance by any Party of its
obligations hereunder, other than payment of fees, shall
be excused during any period of "Excusable Delay", as
hereinafter defined, provided that the Party claiming the
delay gives notice of the delay to the other Parties as
soon as possible after the same has been ascertained.
For purposes hereof, Excusable Delay shall mean delay
that directly affects, and is beyond the reasonable
control of, the Party claiming the delay, including
without limitation; (a) act of God; (b) civil commotion;
(c) riot; (d) strike, picketing or other labor dispute;
(e) shortage of materials or supplies; (e) damage to work
in progress by reason of fire, flood, earthquake or other
-18-
102
11.
casualty; (f) failure, delay or inability of City to
provide adequate levels of public services, facilities or
infrastructure to the Property including, by way of
example only, the lack of water to serve any portion of
the Property due to drought; (g) delay caused by a
restriction imposed or mandated by a governmental entity
other than City; or (h) litigation brought by a third
party attacking the validity of this Agreement, a Project
Approval, a Subsequent Approval or any other action
necessary for development of the Property.
Default Provisions.
11.1. Default by Developer. The Developer shall be deemed
to have breached this Agreement if it:
(a) practices, or attempts to practice, any
fraud or deceit upon City; or willfully violates
any order, ruling or decision of any regulatory or
judicial body having jurisdiction over the Property
or the Project, provided that Developer may contest
any such order, ruling or decision by appropriate
proceedings conducted in good faith, in which event
no breach of this Agreement shall be deemed to have
occurred unless and until there is a final
adjudication adverse to Developer; or
(b) fails to make any payments required under
this Agreement; or
(c) materially breaches any of the provisions of
the Agreement.
11.2. Default by City. City shall be deemed in breach of
this Agreement if it materially breaches any of the
provisions of the Agreement.
11.3. Content of Notice of Violation. Every notice of
violation shall state with specificity that it is
given pursuant to this subsection of the -Agreement,
the nature of the alleged breach, and the manner in
which the breach may be satisfactorily cured. Every
notice shall include a period to cure, which period
of time shall not be less than ten (10) days from
the date that the notice is deemed received,
provided if the defaulting party cannot reasonably
cure the breach within the time set forth in the
-19-
103
notice such party must commence to cure the breach
within such time limit and diligently effect such
cure thereafter. The notice shall be deemed given
on the date that it is personally delivered or on
the date that it is deposited in the United States
mail, in accordance with Section 20 hereof.
11.4. Remedies for Breach. The Parties acknowledge that
remedies at law, including without limitation money
damages, would be inadequate for breach of this
Agreement by any Party due to the size, nature and
scope of the Project. The Parties also acknowledge
that it would not be feasible or possible to
restore the Property to its natural condition once
implementation of the Agreement has begun.
Therefore, the Parties agree that the remedies for
breach of the Agreement shall be limited to the
remedies expressly set forth in this subsection.
Prior to pursuing the remedies set forth herein,
notice and an opportunity to cure shall be provided
pursuant to subsection 11.3 herein.
The remedies for breach of the Agreement by City
shall be injunctive relief and/or specific
performance.
The remedies for breach of the Agreement by
Developer shall be injunctive relief and/or
specific performance. In addition, if the breach is
of subsections 6.8, 6.9, 6.10, 6.11, 6.12, 6.14,
6.15, or subsection 6.16 of this Agreement, City
shall have the right to withhold the issuance of
building permits to Developer throughout the
Project from the date that the notice of violation
was given pursuant to subsection 11.3 hereof until
the date that the breach is cured as provided in
the notice of violation.
Nothing in this subsection shall be deemed to
preclude City from prosecuting a criminal action
against any Developer who violates any City
ordinance or state statute.
12. Mortgage Protection. At the same time that City gives
notice to Developer of a breach, City shall send a copy
of the notice to each holder of record of any deed of
trust on the portion of the Property in which Developer
-20-
104
has a legal interest ("Financier"), provided that the
Financier has given prior written notice of its name and
mailing address to City and the notice makes specific
reference to this section. The copies shall be sent by
United States mail, registered or certified, postage
prepaid, return receipt requested, and shall be deemed
received upon the third (3rd) day after deposit.
Each Financier that has given prior notice to City
pursuant to this section shall have the right, at its
option and insofar as the rights of City are concerned,
to cure any such breach within fifteen (15) days after
the receipt of the notice from City. If such breach
cannot be cured within such time period, the Financier
shall have such additional period as may be reasonably
required to cure the same, provided that the Financier
gives notice to City of its intention to cure and
commences the cure within fifteen (15) days after receipt
of the notice from City and thereafter diligently
prosecutes the same to completion. City shall not
commence legal action against Developer by reason of
Developer's breach without allowing the Financier to cure
the same as specified herein. Notwithstanding any cure
by Financier, this Agreement shall be binding and
effective against the Financier and every owner of the
Property, or part thereof, whose title thereto is
acquired by foreclosure, trustee sale or otherwise.
13. Estoppel Certificate. At any time and from time to time,
Developer may deliver written notice to City and City may
deliver written notice to Developer requesting that such
Party certify in writing that, to the knowledge of the
certifying Party, (i) this Agreement is in full force and
effect and a binding obligation of the Parties, (ii) this
Agreement has not been amended, or if amended, the
identity of each amendment, and (iii) the requesting
Party• is not in breach of this Agreement, or if in
breach, a description of each such breach. The Party
receiving such a request shall execute and return the
certificate within thirty (30) days following receipt of
the notice. City acknowledges that a certificate may be
relied upon by successors in interest to the Developer
who requested the certificate and by holders of record of
deeds of trust on the portion of the Property in which
that Developer has a legal interest.
-21-
14. Administration of Agreement. Any decision by City staff
concerning the interpretation and administration of this
Agreement and development of the Property in accordance
herewith may be appealed by the Developer to the City
Council, provided that any such appeal shall be filed
with the City Clerk of City within ten (10) days after
the affected Developer receives notice of the staff
decision. The City Council shall render its decision to
affirm, reverse or modify the staff decision within
thirty (30) days after the appeal was filed. The
Developer shall not seek judicial review of any staff
decision without first having exhausted its remedies
pursuant to this section.
15. Amendment or Termination by Mutual Consent. In
accordance with the provisions of Chapter 15.40 of the
Moorpark Municipal Code of City or any successor thereof
then in effect, this Agreement may be amended or
terminated, in whole or in part, by mutual consent of
City and the affected Developer.
15.1 Exemption for Amendments of Project Approvals. No
amendment to a Project Approval shall require an
amendment to this Agreement and any such amendment
shall be deemed to be incorporated into this
Agreement at the time that the amendment becomes
effective, provided that the amendment is
consistent with this Agreement.
16. Indemnification. Developer shall indemnify, defend with
counsel approved by City, and hold harmless City and its
officers, employees and agents from and against any and
all losses, liabilities, fines, penalties, costs, claims,
demands, damages, injuries or judgments arising out of,
or resulting in any way from, Developer's performance
pursuant to this Agreement.
Developer shall indemnify, defend with counsel approved
by City, and hold harmless City and its officers,
employees and agents from and against any action or
proceeding to attack, review, set aside, void or annul
this Agreement, or any provision thereof, or any Project
Approval or Subsequent Approval or modifications thereto,
or any other subsequent entitlements for the project and
including any related environmental approval.
-22-
106
17, Time of Essence. Time is of the essence for each
provision of this Agreement of which time is an element.
18. Operative Bate. This Agreement shall become operative on
the date the Enabling Ordinance becomes effective
pursuant to Government Code Section 36937.
19. Term. This Agreement shall remain in full force and
effect for a term of twenty ('20) years commencing on its
operative date or until twelve (12) years after the
initial certificate of occupancy has been issued on the
Warehouse Discount Center building, whichever occurs
last, unless said term is amended or the Agreement is
sooner terminated as otherwise provided herein.
Expiration of the term or earlier termination of this
Agreement shall not automatically affect any Project
Approval or Subsequent Approval that has been granted or
any right or obligation arising independently from such
Project Approval or Subsequent Approval.
Upon expiration of the term
this Agreement, the Parties
reasonably requested by a:
Agreement from the public rec
every portion thereof, to
applicable laws.
or earlier termination of
shall execute any document
y Party to remove this
rds as to the Property, and
the extent permitted by
20. Notices. All notices and other communications given
pursuant to this Agreement shall be in writing and shall
be deemed received when personally delivered or upon the
third (3rd) day after deposit in the United States mail,
registered or certified, postage prepaid, return receipt
requested, to the Parties at the addresses set forth in
Exhibit -"B" attached hereto and incorporated herein.
Any Party may, from time to time, by written notice to
the other, designate a different address which shall be
substituted for the one above specified.
21. Entire Agreement. This Agreement and those exhibits and
documents referenced herein contain the entire agreement
between the Parties regarding the subject matter hereof,
and all prior agreements or understandings, oral or
written, are hereby merged herein. This Agreement shall
not be amended, except as expressly provided herein.
-23-
107
22. Waiver. No waiver of any provision of this Agreement
shall constitute a waiver of any other provision, whether
or not similar; nor shall any such waiver constitute a
continuing or subsequent waiver of the same provision.
No waiver shall be binding, unless it is executed in
writing by a duly authorized representative of the Party
against whom enforcement of the waiver is sought.
23. Severability. If any provision of this Agreement is
determined by a court of competent jurisdiction to be
invalid or unenforceable, the remainder of this Agreement
shall be effective to the extent the remaining provisions
are not rendered impractical to perform, taking into
consideration the purposes of this Agreement.
24. Relationship of the Parties. Each Party acknowledges
that, in entering into and performing under this
Agreement, it is acting as an independent entity and not
as an agent of any of the other Parties in any respect.
Nothing contained herein or in any document executed in
connection herewith shall be construed as creating the
relationship of partners-, -joint ventures- or any other
association of any kind or nature between City and
Developer, jointly or severally.
25. No Third Party Beneficiaries. This Agreement is made and
entered into for the sole benefit of the Parties and
their successors in interest. No other person shall have
any right of action based upon any provision of this
Agreement.
26. Recordation of Agreement and Amendments. This Agreement
and any amendment thereof shall be recorded with the
County Recorder of the County of Ventura by the City
Clerk of City within the period required by Chapter 15.40
of the Moorpark Municipal Code of City or any successor
thereof then in effect.
27. Cooperation Between City and Developer. City and
Developer shall execute and deliver to the other all such
other and further instruments and documents as may be
necessary to carry out the purposes of this Agreement.
28. Rules of Construction. The captions and headings of the
various sections
for convenience
constitute a part
and subsections of this Agreement are
of reference only, and they shall not
of this Agreement for any other purpose
-24-
108
or affect interpretation of the Agreement. Should any
provision of this Agreement be found to be in conflict
with any provision of the Project Approvals or the
Subsequent Approvals, the provision of this Agreement
shall prevail. Should any provision of the
Implementation Plan be found to be in conflict with any
provision of this Agreement, the provisions of the
Implementation Plan shall prevail.
29. Joint Preparation. This Agreement shall be deemed to
have been prepared jointly and equally by the Parties,
and it shall not be construed against any Party on the
ground that the Party prepared the Agreement or caused it
to be prepared.
30. Governing Law and Venue. This Agreement is made, entered
into, and executed in the County of Ventura, California,
and the laws of the State of California shall govern its
interpretation and enforcement. Any action, suit or
proceeding related to, or arising from, this Agreement
shall be filed in the appropriate court having
jurisdiction in the County of Ventura.
31. Attorneys' Fees. In the event any action, suit or
proceeding is brought for the enforcement or declaration
of any right or obligation pursuant to, or as a result of
any alleged breach of, this Agreement, the prevailing
Party shall be entitled to its reasonable attorneys' fees
and litigation expenses and costs, and any judgment,
order or decree rendered in such action, suit or
proceeding shall include an award thereof.
32. Counterparts. This Agreement may be executed in multiple
counterparts, each of which shall be deemed an original,
but all of which constitute one and the same instrument.
-25-
109
IN WITNESS WHEREOF, NLA 118,
and City of Moorpark have ex
fLr rvti;�,�=— 2i 2005.
OWNER/DEVELOPER
NLA 118, L.L.C. (Warehouse D=
�WMS;Olrld
Thomas J. Schlender
President
B y :
Shelley' . Schlender
Secretary
-26-
110
MOORPARK
1 799 Moorpark Avenue Moorpark, California 93021 (865) 517-6200
PUBLIC AGENCY FORM OF ACKNOWLEDGMENT
STATE OF CALIFORNIA }
COUNTY OF VENTURA } ss.
CITY OF MOORPARK }
On this 23rd day of December in the year 2005, before me,
Deborah S. Traffenstedt, City Clerk of the City of Moorpark,
personally appeared Patrick Hunter, personally known to me to
be the person whose name is subscribed to the within instrument
and acknowledged to me that he executed the same in his
authorized capacity as the Mayor of the City of Moorpark, and
that by his signature on the instrument, acknowledged to me
that the City executed the instrument.
witness my hand and Official Seal
AL
Deborah S. Traffensted
City Clerk
0
PATRICK HUNTER ROSEANN MIKOS CLINT D. HARPER KEITH F. MILLHOUSE JAN S. PARVIN
Mayor Mayor Pro Tam Councilmember Councilmember Councitmernber
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
"i
ti
State of California
16 e
ss.
County of _S
_T
On 2- J 2-0 1 r before me, LL(4-M,Vo, �Ict i,,V pa
Dale
appeared T7�zwyvs J h 1
Name and rile all Offim 'Jane Doe 1464l l
-1 V7?
personally
Narne(s) of signers)
personally
� ersonay known to me
6
proved to me on the basis of satisfactory
evidence
X,
LISATAPAAYO
rAO
to be the person(s) whose name(s) -isfare
Commission# 1336624 z
subscribed to the within instrument and
Notary Public - California
acknowledged to me that hatsh /they executed
Los Angeles County
the same in his,414efltheir authorized
My Comm. Expires Dec 27, 2M5
capacity(ies), and that by hisA:iefftheir
signature(s) on the instrument the person(s), or
the entity upon behalf of which the person(s)
acted. executed the instrument.
e,
WITNty hand affb4ficial seal.
Sig naure of Notary Funk.
OPTIONAIL
F.
Though the information below is not required by law, it may prove
valuable to persons relying on the document and could prevent
fraudulent removal and reattachment
of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date:
Number of Pages:
6
Signer(s) Other Than Named Above:
Capacity(les) Claimed by Signer
Signer's Name:
hrr,Mh here
Individualop�,
Corporate Officer — Title(s):
Partner Limited . General
Attorney -in -Fact
I Trustee
Guardian or Conservator
Other:
Signer Is Representing:
A
C 1999 Nasional Notary Associal on - 9350 De Wo Ave PO F3-.2402-Cualswolh,CA91313-2402-w N.nationaliotar)?org Prod No 5907 laeo•der (;all Toil -Free I-aDO.876-6827
"i
EXHIBIT A
LEGAL DESCRIPTION
Lot 1 of Tract No. 5004, in the City of Moorpark, County of
Ventura, State of California, as per Map recorded in Book 137,
Pages 97 to 102 inclusive of Miscellaneous Records (Maps), and
amended map of Tract No. 5004, recorded in Book 146, Pages 1
through 6 inclusive of Miscellaneous Records (Maps), in the
Office of the County Recorder of said county.
APN: 513-0-050-205
-27-
113
ADDRESSES OF PARTIES
To City:
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93021
Attn: City Manager
To Developer:
NLA 118, L.L.C. (Warehouse Discount Center)
30621 Canwood Street
Agoura Hills, CA 91301
Attn: President
-28-
EXHIBIT B
114