HomeMy WebLinkAboutAGENDA REPORT 2021 1103 CCSA REG ITEM 09B POWERPOINTNovember 3, 2021 1
Ventura County Waterworks District No. 1
Proposed Water and Sewer Rate
Adjustments for 2022
Presentation to Moorpark City Council
Joseph Pope, P.E.
Director, Water and Sanitation
County of Ventura Public Works Agency
November 3, 2021
28
Ventura County Waterworks District No. 1
Slide 2
District Size: ~21,500 Acres
Population Served:Approx. 38,703
Water Lines:~177 Miles
Water Service Connections: ~10,941
Reservoirs: 19
Groundwater Wells: 5
Booster Pump
Stations: 11
Service area includes all of the City of Moorpark and
contiguous, unincorporated areas to the north and west of the
City.
County of Ventura Water and Sanitation Department is
responsible for the operation and maintenance of the water and
sewer system.
The appointed five-member Citizens’ Advisory Committee
reviews all policy, budget, and water rate recommendations
before they are recommended to the BOS.
November 3, 2021 29
Slide 3
District 1 Service Area
November 3, 2021 30
Slide 4
Financial Conditions of the District
Dec 2020 Waterworks District Board Approved:
Minimum Reserve policy of 25% Operating Costs, 10% Revenue, and 2% of net
assets
Ended Fiscal Year 20/21 (6/30/21) with reserve fund balances of $10.8M for Water and
$10.4M for Sewer
Annual Water O&M budget for FY 2022: $20.3M (FY21 Actual: $21.5M)
Annual Sewer O&M budget or FY 2022: $5.1M (FY21 Actual: $5.2M)
November 3, 2021 31
Rate Analysis Assumptions
November 3, 2021 Slide 5
Calleguas Municipal Water District Rate increase of 3.5% for 2022
Assumes average inflationary increases used for rate analysis:
Labor 3.5%, Electricity 4%, materials 3%, and new capital loans 30-year @ 2% fixed
Assumes groundwater pumping allocation remains at 2,195 acre-feet per year
Assumes Capital Projects are funded 25% from cash reserves and 75% from loans
Major Water Capital Project Timing Recommendations:
Re-Drill Well 97 and Install Treatment Facilities: FY 2022-2023
Stockton Reservoir #1: FY 2023-24
Grimes/Home Acres Reservoir: FY 2025-2027
Moorpark Desalter: TBD
32
Rate Analysis Assumptions
November 3, 2021 Slide 6
Major Sewer Capital Project Timing Recommendations:
Storage Warehouse: FY 2022-2023
MWRF Hwy 118 Turn Lane: FY 2023-2024
MWRF Generator Replacement: FY 2023
Sewer Replacement and Re-Lining: FY2023-2025
MWRF Control System Upgrades: FY2023-2024
33
Known Risks
November 3, 2021 Slide 7
Wet years result in lower sales and a reduction in revenues
Adjudication of Las Posas Valley (LPV) Groundwater Basin is still on-going
Fox Canyon (or the Courts) will set LPV sustainable pumping yield, which could result
in lower than 2,195 acre-feet pumping allocation
Failure of any Well during peak irrigating time periods will result in increased
purchases of Calleguas water
Magnitude of Calleguas and SCE rates increases are uncertain (but certainly going
up)
Potential for Metropolitan to impose Drought Surcharges
Timing of Moorpark Housing and Commercial Development tracts uncertain, but seem
to be progressing forward
34
Slide 8
Calleguas vs. District 1 Water Rate Increases 2011-2021
November 3, 2021 35
November 3, 2021
Ventura County Waterworks District No. 1
Moorpark Water and Sewer Services
Proposed Water, Sewer, and Reclaimed Water Rate Increases
Effective July 2022
Slide 9
Water Variable Commodity Rate Adjustment: 3.5%
Water Fixed Meter Charge Adjustment: 3.5%
Reclaimed Water Variable Commodity Rate Adjustment: 0% (No change)
Reclaimed Water Meter Charge: Reset to same as Potable Meters
Agricultural Water Variable Commodity Rate Adjustment: 9.8% (3.5% +$0.25/HCF)
Sewer Rate (No Change):$28/month Residential Unit Equivalent (RUE)
Effective Jan 2023 through 2027:Calleguas Pass-Through Rate per Gov Code 53756
36
Ventura County Waterworks District No.1
Moorpark Water Services
Proposed Rate Increase Recommendation
Slide 10November 3, 2021
3.5% M&I Commodity rate adjustment & 9.8% Ag Commodity rate adjustment
Tier Proposed Monthly Use (HCF)Current 2021 Proposed 2022
1 0 - 10 $3.95 $4.09
2 >10 – 25 $4.72 $4.89
3 > 25 $5.42 $5.61
Commodity Rates for Residential Customers
Note: Rates per 100 Cubic Feet of Water (HCF)=748 Gallons
Customer Class Current 2021 Proposed 2022
Agricultural $4.09 $4.49
Commercial $4.52 $4.68
Industrial $4.25 $4.40
Institutional $5.08 $5.26
Non-Tiered Residential $4.84 $5.01
Multi-Family Residential $4.18 $4.33
Commodity Rates for Other Customer Classes
37
Ventura County Waterworks District No.1
Moorpark Water Services
Proposed Meter Charge Recommendation
Slide 11November 3, 2021
•3.5% Fixed meter charge increase
•Reset Reclaimed Meter Charges to same as potable charges
Meter Size Current 2021 Proposed 2022
3/4-inch $14.02 $14.51
1-inch $18.91 $19.57
1 1/2-inch $31.10 $32.19
2-inch $45.73 $47.33
3-inch $92.05 $95.27
4-inch $160.32 $165.93
6-inch $323.71 $335.04
Meter Size Current 2021 Proposed 2022
2-inch $9.18 $9.50
3-inch $13.86 $14.35
4-inch $21.93 $22.70
6-inch $50.95 $52.73
8-inch $101.01 $104.55
10-inch $176.27 $182.44
20-inch $1,056.29 $1,093.26
Note: Water used through private fire services will be charged at the temporary construction water rate
Monthly Meter Charges
Monthly Fireline Charges
38
Slide 12
Proposed Water Rate Increases Impact on Customers
Calculators are available on our website: http://pwa.vcpublicworks.org/wsd/ratesandcharges/
November 3, 2021
Meter /
Service
Usage Hundred
Cubic Feet (HCF)
2021 Bill 2022 Bill
(July)
%
Increase
¾” Residential*20 $100.76 104.29 3.5%
1” Residential 50 $259.94 269.04 3.5%
3” Ag 200 $910.02 $993.27 9.1%
*83% of Residential Customers have ¾” Meters
39
November 3, 2021
Ventura County Waterworks District No. 1
Moorpark Water Services
Cash Reserves Forecast With No Rate Increases
Cash Balance decreases due to inflationary factors
Slide 1340
November 3, 2021
Ventura County Waterworks District No. 1
Moorpark Water Services
Cash Reserve Forecast With Recommended Rates
Capital Projects 25% Rate Financed / 75% Debt Financed
Proposed Rate Increase maintains positive Cash Reserves for Capital Projects and Operations
Slide 1441
November 3, 2021
Ventura County Waterworks District No. 1
Moorpark Sewer Services
Cash Reserves Forecast with No Rate Increases
Assumes Capital Projects are funded with Rates and Cash Reserves
(Includes FY22 increases to fixed Reclaim Meter Charges)
Slide 1542
November 3, 2021
Ventura County Waterworks District No. 1
Moorpark Water Services
Agricultural Glide Path Rate Analysis 2022
Achieves Full Cost of Service by 2024
Slide 16
Ventura County Waterworks District - Moorpark
Agricultural Glide Path Rate Analysis - Based on Proposed Rate Increase
Commodity Rate % of Increase 3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%
Additional Agricultural Rate Increase $0.20 $0.25 $0.25 $0.25 $0.25 $0.25 $0.25 $0.25
Agricultural Rate % of Increase 9.4%9.4%9.8%9.1%7.3%3.6%3.7%3.5%
ANALYSIS USING FY22 PROPOSED RATE INCREASE
Estimated Revenue Loss from Agricultural Water Sales on the Glide Path Rates:
FY2020 FY21 (Current Rate)FY2022 FY2023 FY2024 FY2025 FY2026 FY2027
AGR Rate calculated at Full Cost of Service $4.57 $4.73 $4.90 $5.08 $5.26 $5.45 $5.65 $5.85
AGR on the Glide Path Rate - Made Whole $3.71 $4.09 $4.49 $4.90 $5.26 $5.45 $5.65 $5.85
Discount ($/hcf)($0.86)($0.64)($0.41)($0.18)$0.00 $0.00 $0.00 $0.00
$/Acre-Foot $1,616.08 $1,781.60 $1,955.84 $2,134.44 $2,291.26 $2,374.02 $2,461.14 $2,548.26
Revenue Loss due to the Glide Path:
AGR Estimated Usage (HCF)869,368.00 940,047.00 779,018.33 826,148.94 859,194.89 859,194.89 859,194.89 859,194.89
Discount ($/hcf)($0.86)($0.64)($0.41)($0.18)$0.00 $0.00 $0.00 $0.00
Annual Revenue Loss ($755,169.56) ($674,643.28) ($533,527.00) ($234,052.16) ($74,353.40)$0.00 $0.00 $0.00
Annual Compounding Revenue Loss ($3,176,643.64) ($3,096,117.36) ($3,710,170.64) ($3,944,222.80) ($4,018,576.21) ($4,018,576.21) ($4,018,576.21) ($4,018,576.21)
43
THANK YOU
QUESTIONS?
November 3, 2021 17
44