Loading...
HomeMy WebLinkAboutAGENDA REPORT 2022 0406 CCSA REG ITEM 10ECITY OF MOORPARK, CALIFORNIA City Council Meeting of April 6, 2022 ACTION APPROVED STAFF RECOMMENDATION. BY A. Hurtado. E. Consider Amendment No. 7 to Phoenix Civil Engineering, Inc. to Increase the Cost for Design Plan Completion and Construction Phase Services by $34,720. Staff Recommendation: Authorize the City Manager to sign Amendment No. 7 to the Agreement with Phoenix Civil Engineering, Inc. for Design Plan Completion and Construction Phase Services for an Agreement increase of $34,720 and a revised total Agreement not-to-exceed amount of $353,004.65, subject to final language approval of the City Manager. (Staff: Shaun Kroes, Public Works Manager) Item: 10.E. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Shaun Kroes, Public Works Manager DATE: 04/06/2022 Regular Meeting SUBJECT: Consider Amendment No. 7 to Phoenix Civil Engineering, Inc. to Increase the Cost for Design Plan Completion and Construction Phase Services by $34,720 BACKGROUND On November 17, 2021, City Council awarded a construction contract to F.S. Contractors, Inc. (F.S.) for $1,622,701 for the Metrolink North Parking Lot Expansion Project (C0032). The project designer as well as construction management firm is Phoenix Civil Engineering, Inc. (Phoenix). F.S.’s total contract value is $1,784,971 and Phoenix’s total contract value is $318,284.65. F.S.’s contract was executed on December 7, 2021, and their notice to proceed was issued March 7, 2022. DISCUSSION As the City has moved forward with construction of the project, several items have arisen that have increased the scope of work for Phoenix, including: • Additional design updates required by Metrolink during the permitting process • Modifications to drainage areas • Updated lighting plans • Adjustments to landscaping • Anticipated increase of observational services Phoenix has submitted an updated Scope of Services in the amount of $34,720. Staff is recommending approval of Amendment No. 7 (attached) which incorporates the additional scope of work. FISCAL IMPACT The project cost breakdown is provided in Table 2 on the following page. Item: 10.E. 272 Honorable City Council 04/06/2022 Regular Meeting Page 2 Table 2: Project Expenditure Breakdown Fund Expense Line Expense Line Description Current FY 21/22 Contractor TSM 2001-430-C0032-55200 Infrastructure 0 Budget Amendment 200,000$ (29,514)$ F.S. (92,657)$ Phoenix (Amendment No. 6) (34,720)$ Phoenix (Amendment No. 7) (548)$ State SWPPP Balance 42,561$ STA 2413-430-C0032-55200 Infrastructure 25,231$ (25,231)$ F.S. Balance -$ TDA 2414-430-C0032-55200 Infrastructure -$ Budget Amendment 700,000$ (700,000)$ F.S. Balance -$ SGR 2417-430-C0032-55200 Infrastructure 7,325$ (7,325)$ F.S. Balance -$ Prop 1B 2434-430-C0032-55200 Infrastructure 995,914$ Budget Amendment 26,987$ (1,022,901)$ F.S. Balance -$ Prop 1B 2434-430-C0032-55300 Professional Service 105,375$ (103,281)$ Phoenix (thru Amend No. 5) (2,094)$ Phoenix (Amendment No. 6) Balance -$ Total Balance 42,561$ There is currently $77,281 available in Expense Line 2001-430-C0032-55200 to cover the expenditure. Table 2 above provides the impact of Amendment No. 7. COUNCIL GOAL COMPLIANCE This action supports City Council Strategy 3, Goal 3, Objective 14 (3.3.14): “Complete renovation of the existing north Metrolink parking lot and expand the parking lot to the west for a net increase in downtown public parking spaces.” 273 Honorable City Council 04/06/2022 Regular Meeting Page 3 STAFF RECOMMENDATION Authorize the City Manager to sign Amendment No. 7 to the Agreement with Phoenix Civil Engineering, Inc. for Design Plan Completion and Construction Phase Services for an Agreement increase of $34,720 and a revised total Agreement not-to-exceed amount of $353,004.65, subject to final language approval of the City Manager. Attachment: Phoenix Civil Engineering, Inc. Amendment No. 7 274 ATTACHMENT AMENDMENT NO. 7 TO AGREEMENT BETWEEN THE CITY OF MOORPARK AND PHOENIX CIVIL ENGINEERING, INC. FOR METROLINK STATION NORTH PARKING LOT EXPANSION DESIGN This Amendment No. 7 to the Agreement between the City of Moorpark, a municipal corporation (“City”), and Phoenix Civil Engineering, Inc., a corporation (“Consultant”), for engineering design services (“Agreement”), is made and entered into the ___ day of ____________________, 2022. RECITALS WHEREAS, on February 16, 2016, the City and Consultant entered into an Agreement to have the Consultant provide engineering design services in the amount of fifty-nine thousand nine hundred two dollars ($59,902.00) plus a ten percent (10%) contingency in the amount of five thousand nine hundred ninety dollars ($5,990.00) for a total amount of sixty-five thousand eight hundred ninety-two dollars ($65,892.00); and WHEREAS, on May 6, 2016, the City and Consultant executed Amendment No. 1, specifying when administrative fees would be considered for reimbursement costs; and WHEREAS, on August 4, 2016, the City and Consultant executed Amendment No. 2, adding Exhibit D to the Agreement for lighting design and electrical engineering services as well as landscape architectural services and increasing the compensation from sixty-five thousand eight hundred ninety-two dollars ($65,892.00) by a value of twenty-nine thousand seven hundred thirty-six dollars ($29,736.00), for a total contract value of ninety-five thousand six hundred twenty-eight dollars ($95,628.00); and WHEREAS, on February 21, 2017, the City and Consultant executed Amendment No. 3, adding Exhibit E to the Agreement to task Consultant with preparing a Storm Water Pollution Prevention Plan (SWPPP) and filing the SWPPP with the California State Water Resources Control Board and increasing the compensation from ninety-five thousand six hundred twenty-eight dollars ($95,628.00) by a value of five thousand twenty dollars ($5,020.00), for a total contract value of one hundred thousand six hundred forty-eight dollars ($100,648.00); and WHEREAS, on August 10, 2020, the City and Consultant executed Amendment No. 4, adding Exhibit F to the Agreement to task Consultant with issuing a bid set for contract documents, bid phase services, and construction management services in a net increase amount of eighty-one thousand six hundred fifty-five dollars and sixty-five cents ($81,655.65) after factoring in a remaining balance of twenty-three thousand three hundred fifty-six dollars and thirty-five cents ($23,356.35), which includes the five thousand twenty dollars ($5,020.00) for the SWPPP work and added a contingency in the amount of ten thousand five hundred dollars ($10,500); and 275 Amendment No. 7 to Agreement between City of Moorpark and Phoenix Civil Engineering, Inc. Page 2 WHEREAS, on March 22, 2021, the City and Consultant executed Amendment No. 5, adding Exhibit G to the Agreement to task Consultant with assuming additional tasks, including redesign of the North Parking Lot to accommodate additional pepper trees, driveway accessibility, reduction of the parking lot footprint, redesign a section of the Metrolink South Parking Lot access ramp, and design sidewalk improvements on High Street connected to the North Parking Lot for a net increase of thirty-thousand seven hundred thirty dollars ($30,730); and WHEREAS, on November 24, 2022, the City and Consultant executed Amendment No. 6, adding Exhibit H to the Agreement to task Consultant with additional design updates for both civil, landscaping and electrical work during the course of the bidding process and also tasked Consultant with assuming oversight of geotechnical and materials testing services for a net increase of eighty-six thousand one hundred thirty-seven dollars ($86,137) along with an additional contingency in the amount of eight thousand six hundred fourteen dollars ($8,614); and WHEREAS, additional work is needed for engineering design services, including design updates for both civil, landscaping and electrical work along with additional construction coordination and inspection services during the course of construction; and; WHEREAS, Consultant has provided a Proposal dated March 23, 2022, which is attached hereto as Exhibit I, in the net increase amount of thirty-four thousand seven hundred twenty dollars ($34,720); and WHEREAS, the City and Consultant now desire to amend the Agreement to increase the compensation for services to be performed by Consultant from three hundred eighteen thousand two hundred eighty-four dollars and sixty-five cents ($318,284.65) by a value of thirty-four thousand seven hundred twenty dollars ($34,720) for a total contract value of three hundred fifty-three thousand four dollars and sixty-five cents ($353,004.65), and document said agreement to amend by jointly approving Amendment No. 7 to the Agreement. NOW, THEREFORE, it is mutually agreed by and between the parties to the Agreement as follows: I. Section 2, SCOPE OF SERVICES, is amended by replacing this section in its entirety as follows: “City does hereby retain Consultant, as an independent contractor, in a contractual capacity to provide professional engineering services, as set forth in Exhibit C, Exhibit D, Exhibit E, Exhibit F and Exhibit G. In the event there is a conflict between the provisions of Exhibit C, Exhibit D, Exhibit E, Exhibit F, Exhibit G, Exhibit H and Exhibit I and this Agreement, the language contained in this Agreement shall take precedence. Consultant shall perform the tasks described and set forth in Exhibit C, Exhibit D, Exhibit E, Exhibit F, Exhibit G, Exhibit H and Exhibit I. 276 Amendment No. 7 to Agreement between City of Moorpark and Phoenix Civil Engineering, Inc. Page 3 Consultant shall complete the tasks according to the schedule of performance, which is also set forth in Exhibit C, Exhibit D, Exhibit E, Exhibit F, Exhibit G, Exhibit H and Exhibit I. Compensation for the services to be performed by Consultant shall be in accordance with Exhibit C, Exhibit D, Exhibit E, Exhibit F, Exhibit G, Exhibit H and Exhibit I. Compensation shall not exceed the rates or total contract value of three hundred thirty-three thousand eight hundred ninety dollars and sixty-five cents ($333,890.65), plus a contingency in the amount of nineteen thousand one hundred fourteen dollars ($19,114.00) for a total contract value of three hundred fifty-three thousand four dollars and sixty-five cents ($353,004.65) without a written Amendment to the Agreement executed by both parties. Payment by City to Consultant shall be in accordance with the provisions of this Agreement.” II. Section 5, PAYMENT, is amended by replacing this section in its entirety as follows: “Taxpayer ID or Social Security numbers must be provided by Consultant on an IRS W-9 form before payments may be made by City to Consultant. The City agrees to pay Consultant monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in Exhibit C, Exhibit D, Exhibit E, Exhibit F, Exhibit G, Exhibit H and Exhibit I based upon actual time spent on the above tasks. This amount shall not exceed a total contract value of three hundred thirty-three thousand eight hundred ninety dollars and sixty-five cents ($333,890.65), plus a contingency in the amount of nineteen thousand one hundred fourteen dollars ($19,114.00) for a total contract value of three hundred fifty-three thousand four dollars and sixty-five cents ($353,004.65) for the total term of the Agreement unless additional payment is approved as provided in this Agreement. Consultant shall not be compensated for any services rendered in connection with its performance of this Agreement, which are in addition to those set forth herein, unless such additional services and compensation are authorized, in advance, in a written amendment to this Agreement executed by both parties. Consultant shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any expense or reimbursable cost appearing on any invoice shall be accompanied by a receipt or other documentation subject to approval of the City Manager or 277 Amendment No. 7 to Agreement between City of Moorpark and Phoenix Civil Engineering, Inc. Page 4 the City Manager’s designee. Except as otherwise provided, reimbursements shall be billed at cost. Mileage shall be billed at the current Internal Revenue Service approved mileage reimbursement rate. Subconsultant costs may include an administrative fee of no more than ten percent (10%). If the City disputes any of Consultant’s fees or expenses, City shall give written notice to Consultant within thirty (30) days of receipt of any disputed fees set forth on the invoice.” III. Remaining Provisions: Except as revised by this Amendment No. 7 all the provisions of the Agreement shall remain in full force and effect. In Witness Whereof, the parties hereto have caused this Amendment to be executed the day and year first above written. CITY OF MOORPARK PHOENIX CIVIL ENGINEERING, INC. _______________________________ _______________________________ Troy Brown City Manager Jon Turner President Attest: _______________________________ Ky Spangler, City Clerk 278 Mr. Shaun Kroes March 23, 2022 City of Moorpark 799 Moorpark Ave. Moorpark, CA 93021 City of Moorpark – Metrolink Station Parking Lot Expansion Design–Fee Amendment Proposal for Additional Construction Phase Services Dear Shaun- Per our discussion, attached is the fee amendment proposal covering the additional efforts related to civil design changes and the additional effort related to the construction observation/management for the additional site improvements (structural, landscape architect, geotechnical, civil). Additional Metrolink plan check comments and additional project requirements and recently potholed onsite utilities have necessitated modifications to the drainage areas, the lighting plans, and landscape design increasing the work that will be needed during the construction phase. Our proposal for this project included the use of a materials testing firm (Oakridge Geoscience, Inc.) and we were recently notified that they have decided to retire and close their firm. We were able to include their recommended materials testing firm that also included staff from the original firm. The replacement materials testing firm is going to cover the same scope of work that was previously agreed to with a minor addition in fee (their fee is more than the previous firm). Due to the additional plan check comments, design modifications and change in subconsultants, this proposal covers additional effort required for construction phase services. I have included fee requests from the original design subconsultants in this proposal. The proposal fee is in addition to the previously approved bid and construction phase services. Based on our conversations and continuing the numbering from the original proposal, I have prepared my proposal to include the following: Phase 3: Additional Bid and Construction Phase Services Task 302: Construction Phase Services I appreciate the opportunity to continue to assist you with this project. Please let me know if you have any questions or would like to discuss my proposal. Sincerely, ______________________________ Jon Turner, PE Principal Engineer EXHIBIT I 279 March 23, 2022 Page 1 of 1 Scope of Services Background/Project Understanding The City of Moorpark is improving the existing north parking lot areas serving the Metrolink station. The City has obtained grant funding for the project. The project has begun construction; the design team is reviewing submittals and monitoring the on-site activities. Since the proposal for construction phase services was submitted in October 2021, the Geotechnical firm Oakridge Geosciences, Inc. (OGI) has retired and closed their firm. OGI has worked with and recommends the firm, Union Materials Testing, Inc. (UMT). UMT hired OGI staff and they are familiar with the project location and design team. UMT has provided an updated scope of services that is reflected in this proposal. The design team subconsultants, Phoenix Civil, Architerra and Visual Concepts, have been involved in additional design effort during construction phase. Due to additional requirements and design plan check modifications imposed by Metrolink, the design team firms will play a larger role in the design services during construction phase than previously thought. Ongoing Metrolink reviews and staff changes outside of our control, this proposal includes additional design services during construction. Newly discovered utility information has also increased the scope of work. The original scope of services for Bid Phase and Construction Phase Services is still in effect; however, this proposal covers the additional effort that will be required due to the increase of construction scope. Based on our conversations, I have prepared the fee amendment proposal to include the following: Phase 3: Construction Phase Services Task 302: Construction Phase Services The additional construction phase services include review of additional project shop drawings related to the increased scope of work for the project. It is estimated that additional onsite observation will be required at the request of the City. Increased coordination and meeting time with Metrolink is included in this fee amendment. The electrical and grading plans will be updated and revised to incorporate the new Metrolink requirements as well as uncovered/unknown existing electrical system configurations. Additional layout considerations and City review effort is included in this scope to cover the discovered utility conflicts/changes. The City requested site rendering will be prepared for use in the grand opening ceremony and that effort is included in this fee amendment. Construction coordination as required by the City will also be included. Preparation for and attendance at additional onsite meetings is also included. Schedule The work associated with Tasks 302 will be made a top priority. Every effort will be made to keep the project schedule moving along. Fees Additional work associated with Task 302 level of effort is listed below: Task 302: Construction Phase Services $34,720.00 Assumptions The following assumptions apply to this proposal: • All Public agency or project permit fees to be paid by client. • Additional large format printing costs (beyond what included in this proposal) will be billed at cost in addition to the contract amount. 280