HomeMy WebLinkAboutAGENDA REPORT 2022 1102 CCSA REG ITEM 08A POWERPOINTPatriot Offices
November 2, 2022
Filed By: Amir Development on Behalf of Moorpark Lot A, LP.
Presented by: Shanna Farley, Principal Planner
Project Request
On January 22,2022,Keenan Wolens of Amir Development (Applicant)submitted an application for the proposed Pentair Warehouse Projecttodevelopawarehouseandofficebuildingtotaling90,566 sq.ft.andrelatedsiteimprovementsrequiringanIPDandrequestingabuildingheightofupto44feetrequiringaCUP.
The following permits have been requested to facilitate the Project:1.Industrial Planned Development No. 2022-012.Conditional Use Permit No. 2022-01
Planning Commission
On September 27, 2022, the Planning Commission
conducted a hearing and unanimously recommended
approval of the project.
Location -Aerial
•10941 Los Angeles Avenue
•5.65 Acre Site
•Site currently vacant
General Plan
Zoning
Street View
Warehouse and Office Building
•1 Building
•Private loop road
•Primary Access –Montair Drive
•Emergency Access –New Bridge to LA Ave
Proposed Development
Entitlements
•Industrial Planned Development
•Conditional Use Permit
Site Plan
RPD Development Standards
Development Standard Zoning Code Proposed
Height*30’*44’
Floor Area Ratio 0.38 0.37
Setback -Front 20’ 113’ 7”
Setback –Interior Side 5’61’
Setbacks -Rear 10’48’
Minimum Lot Size 10,000 square feet 246,114 sq. ft.
Parking 185 Spaces 185 spaces
Loading Parking 4 spaces 21 spaces
Landscaping 10% of parking area 16.9% of parking area
*Per MMC 17.24.035 -Height may be increased (to maximum 60 feet) with approval of a conditional use permit.
Industrial Warehouse Development
•90,566 sq. ft. Building
•87,566 sq. ft. warehouse and 3,000 sq. ft. offices
Southwest Corner –Los Angeles Avenue
Southeast Corner –Los Angeles Avenue
Elevations
Circulation and Access
Los Angeles Avenue
Landscape Plan
Lo
s
A
n
g
e
l
e
s
A
v
e
n
u
e
CEQA –Environmental Analysis
Summary of Project Impacts
No Impact /
Less than Significant Impact
Agricultural & Forestry
Resources
Greenhouse Gas
Emissions
Mineral Resources
Population & Housing
Recreation
Utilities & Service
Systems
Aesthetics
Air Quality
Significant and
Unavoidable
Impacts
NONE
Energy
Geology & Soils
Hazards & Hazardous
Materials
Hydrology & Water Quality
Noise
Public Services
Tribal Cultural Resources
Wildfire
Less than Significant
Impact with Mitigation
Biological Resources
Cultural Resources
Land Use and Planning
Transportation
Less than Significant Impact with Mitigations
Biological Resources
•BIO-1: Nesting Bird Survey
•BIO-2: Biological Monitor
•BIO-3: Pre-construction Grubbing
Cultural Resources
•CUL-1: Archeological pre-construction training, findings instructions
•CUL-2: Archeological post-construction report
Land Use Resources
•LU-1: Signal at Montair Drive and Los Angeles Avenue
•LU-2: Emergency Driveway access only at new
driveway/bridge
Transportation
•TRA-1:Vanpool for 12% of employees or alternatives:
•rideshare incentive programs,
•ride matching services,
•discounted transit expense program,
•end of trip facilities, or
•telecommuting/alternative work schedules.
Public Comments –Draft MND
The Draft MND was circulated for 30 days for public review.
7 comment letters were received, including:
•6 from State/Local Agencies
•1 from an individual
Staff reviewed the comments and provided a detailed reply to each in the Final MND.The
comments did not result in the determination of any new environmental impacts beyond
those analyzed in the Draft MND.The Final MND includes minor revisions in response to
some of the comments received to correct and clarify the responses provided.These
revisions did not alter the conclusions of the Draft MND.All commentors were provided
notice of availability of the Final MND.
Comment Letter
Dated September 27, 2022
From Lozeau Drury, LLP
Contests the project should have required an EIR. The letter
claims that there are potential significant impacts associated
with biological and air quality resources due to the Project.
Response to Comment
The MND prepared for the Project addresses the requirements of
CEQA through a substantive and evidence-based analysis of the
Project and the potential impacts which it may generate.In
addition,the MND was circulated to various agencies with
expertise and regulatory authority to consider the MND and their
related comments were addressed and incorporated in the MND
after a 30-day review process.Therefore,staff concludes that
the MND adequately addresses the legal obligations under
CEQA and no revisions or changes to the Project,MND or
MMRP are proposed.
Notice of Public Hearing
Staff has provided the required notice of public hearing and conducted additional noticing,
including:
•A legal notice in the Ventura County Star
•Mailed notice to all property owners and residents within 1,000 feet of the Project Site
•The posting of a sign advertising the hearing on the Project Site
•Posting of notice and all project documents online at www.moorparkca.gov/1070/Pentair-
Expansion
Recommendation
Planning Commission recommends that the City Council:
1.Open the public hearing,receive public testimony,and close the
public hearing;and
2.Adopt Resolution No.2022-____:a)adopting the Mitigated Negative
Declaration and associated Mitigation Monitoring and Reporting
Program (MMRP)and b)approving Industrial Planned Development
No.2022-01 and Conditional Use Permit No.2022-01.