Loading...
HomeMy WebLinkAboutAGENDA REPORT 2022 0524 REG PC ITEM 10ACITY OF MOORPARK, CALIFORNIA Planning Commission Meeting of May 24, 2022 ACTION: Approved Staff Recommendation. BY: J. Lugo A.Consider Draft Five-Year Capital Improvement Program for the City Engineer/Public Works and Parks, Recreation and Community Services Departments for FY 2022/23 through FY 2026/27. Staff Recommendation: 1) Find the draft Five Year Capital Improvement Program for FY 2022/23 through FY 2026/27 to be in conformity with the Moorpark General Plan, except as noted in the staff report. 2) Find the planned acquisition of street right-of-way for certain specified projects described in this report, to be in conformity with the Moorpark General Plan. (Staff: Shaun Kroes) Item: 10.A. Item: 10.A. MOORPARK PLANNING COMMISSION AGENDA REPORT TO: Honorable Planning Commission FROM: Shaun Kroes, Public Works Manager DATE: 05/24/2022 SUBJECT: Consider Draft Five-Year Capital Improvement Program for the City Engineer/Public Works and Parks, Recreation and Community Services Departments for FY 2022/23 through FY 2026/27 BACKGROUND The City of Moorpark’s Five-Year Capital Improvement Program (CIP) serves as a framework for the Moorpark City Council to identify, plan, and prioritize needed municipal capital improvements. Many CIPs are multi-year projects that incorporate various stages of development; from conceptual design, right-of-way acquisition, final design, and construction. Individual CIPs can involve multiple City staff and consume a large amount of staff time at various times of the year. Additionally, many CIPs are reliant u pon grant funding or from funds that are specifically allocated for a project improvement type (for example, street and road funding). Consequently, the City’s CIP identifies the priorities for City staff as they work on both CIPs as well as the day -to-day tasks and programs that are operated on an ongoing basis. Primarily, two departments are responsible for the City’s CIPs; Parks, Recreation and Community Services Department (PRCS), and the Public Works Department . Public Works projects primarily focus on improvements such as streets, storm drains, traffic signals, and construction within the public right -of-way, while the PRCS projects focus on improvements to City-owned facilities, Landscape Maintenance Districts (LMDs), open space, and parks. The CIP is updated annually and presented to City Council as a listing of citywide planned improvement projects to use for planning and programming purposes. The presented CIP 1 Honorable Planning Commission May 24, 2022 Page 2 covers fiscal year (FY) 2022/23 through FY 2026/27. Prior to City Council action approving the CIP, it is necessary that the Planning Commission first review the document and determine conformity with the Moorpark General Plan as required by Government Code Section 65401. This staff report summarizes the proposed changes from the previous CIP and requests that the Planning Commission render its finding with regard to General Plan conformity. Also included in this report is a description of certain projects which require acquisition of additional street right-of-way and a request that said acquisitions are also in conformance with the Moorpark General Plan, as required by Government Code Section 65402. DISCUSSION A.General Plan Conformity Staff from the Public Works, PRCS, and Community Development Departments reviewed the draft CIP and confirmed the following: 1)All of the future streets and other Public Works projects listed in the Circulation Element and other elements of the Moorpark General Plan have been included in the CIP. 2)The Circulation Element of the Moorpark General Plan designates Moorpark Avenue to be a two-lane local collector. CIP Project C0004: Moorpark Avenue Widening calls for the widening of Moorpark Avenue to more than two (2) lanes. Staff is currently working to update and revise the Circulation Element and will present this document to the City Council in the future. It is the intent of staff to include in the recommended changes, a different designation for Moorpark Avenue which will allow for more than two (2) lanes of traffic. This will occur prior to any commitment of funds for the widening project. Except for this project, the Public Works projects listed in the subject draft CIP are in conformance with the Moorpark General Plan. 3)As noted above, the PRCS projects in general involve improvements to existing parks, landscaped areas, and trails. All of the identified projects are consistent with the policies of the Land Use, Open Space, Conservation, and Recreation Elements of the General Plan, which call for adequate recreation facilities for the City’s residents and the appropriate preservation of natural open space. B.Right-of-Way Acquisition The following projects will require acquisition of additional street right -of-way or construction/slope easements: 2 Honorable Planning Commission May 24, 2022 Page 3 Project No. Project Name C004 Moorpark Avenue Widening C007 Spring Road / Charles Street Bus Turn Out C0021 Los Angeles Avenue Widening (Moorpark Avenue to Spring Road) C0022 Spring Road Widening C0025 Route 23 North Alignment* C0031 North Hills Parkway* * The majority of right-of-way required by these projects will be dedicated to the City by developers. Government Code Section 65402 requires the Planning Commission make a finding as to the conformity of street right-of-way acquisitions for the above stated projects with the Moorpark General Plan. Public Works and Community Development staff reviewed the above cited list of projects requiring street right-of-way acquisition and found said acquisitions to be in conformance with the Moorpark General Plan. C. Revisions to the CIP On April 27, 2021, the Planning Commission reviewed the FY 2021/22 through FY 2025/26 CIP and found that the projects contained within, with the exception of the proposed Moorpark Avenue Widening project, were in conformance with the City’s General Plan. The proposed FY 2022/23 through FY 2026/27 CIP contains the following projects that have not previously been reviewed by the Planning Commission: • City Hall at 323 Science Drive (C0070): This project includes the purchase and tenant improvements at 323 Science Drive for the new Moorpark City Hall. The building is intended to serve as a temporary City Hall in the coming years while the City continues efforts to site, plan, and build a City Hall/Civic Center. The project was established in FY 2021/22 after the initia l adoption of the FY 2021/22 Budget. • Additional Softball Fences at Mountain Meadows Park (C0072): This project would install an additional 20-foot high softball fence at Mountain Meadows Park. • Moorpark Highlands Slope Naturalization (M0052). This project includes the naturalization of slope areas in Landscape Maintenace District No. 22 (Moorpark Highlands) with low maintenance, self-sustaining native and drought tolerant landscaping. This project begain in FY 2020/21 but was not included in prior CIPs. It has now been included to recognize the project and associated expenditures estimated to occur in FY 2021/22. 3 Honorable Planning Commission May 24, 2022 Page 4 • Replace Skate Park Fencing at Poindexter Park (M0053). This project would replace damaged chain link fence around the skatepark with a stronge r “no- climb” alternative. • Arroyo Vista Community Park EV Charger (R0030). This project would install electric vehicle chargers in Lot B at Arroyo Vista Community Park . The City was awarded a Ventura County Air Pollution Control District grant to fund a portion of the project cost. This was another project initiated in FY 2021/22 after adoption of the FY 2021/22 Budget. The following CIP projects have been completed or are expected to be completed during this fiscal year: • Central Irrigation System (C0019) • Streetlight Acquisition and Retrofit (C0050). • Sidewalk Rehabilitation (M0050). The FY 2022/23 through 2026/27 CIP also proposes to remove approximately $125,000 from the Traffic Signal Improvements at Spring Road project (C0060) as the project is considered complete. The funding will be returned to Los Angeles Area of Contribution Fund (2014) where it can become a source of funding for other projects . STAFF RECOMMENDATION S 1. Find the draft Five Year Capital Improvement Program for FY 2022/23 through FY 2026/27 to be in conformity with the Moorpark General Plan, except as noted in the staff report. 2. Find the planned acquisition of street right-of-way for certain specified projects described in this report, to be in conformity with the Moorpark General Plan. Attachment 1 : Draft CIP (Under Separate Cover) 4 Capital Improvement Program Fiscal Year 2022/23 –2026/27 Approved on June __, 2022 Council Resolution No. 2022-____ PC Attachment 1 5 Page 2 of 144 6 Fiscal Year 2022/23 Capital Improvement Projects Summary Page 3 of 144 7 CITY OF MOORPARKFIVE-YEAR CAPITAL IMPROVEMENT PROJECTS SUMMARYFISCAL YEAR 2022/23 THRU 2026/27Project Number Project Title Prior Years Actual thru FY20/21 FY21/22 CY Estimate FY22/23 Recommended FY23/24Projected FY24/25 Projected FY25/26 Projected FY26/27 Projected Projected Project Cost Thru 26/27 Page C0003 Millard Drain - - 250,000 -- - 510,000 760,000 C0004 Moorpark Avenue Widening Project 2,343,217 - 101,648 370,755 - - - 2,815,620 C0009 High Street Improvements- - 1,500,0002,000,000 - - - 3,500,000 C0012 New City Hall and Civic Center Complex 1,515,359 288,298 96,222-- - - 1,899,880 C0014 Pedestrian Access Improvements at the Civic Center58,270 - 232,223-- - - 290,492 C0019 Central Irrigation System 366,822 - --- - - 366,822 C0020 Princeton Avenue Widening3,672,890 434,368 17,868,011 -- - - 21,975,270 C0021 Los Angeles Ave Widening-Spring Rd to Moorpark Ave. 2,474,956 803,000 1,722,725 -- - - 5,000,681 C0022 Spring Road Widening475,366 - 774,568-- - - 1,249,934 C0025Route 23 North Alignment 192,325 - --- - - 192,325 C0027 Underground Utility District No. 2 240 - --- - 1,710,000 1,710,240 C0030 Los Angeles Avenue Widening at Shasta Avenue 1,678,147 - 10,000-- - -1,688,147 C0031 North Hills Parkway 1,973,838 - - -- - -1,973,838 C0032 Metrolink North Parking Lot Expansion 124,939 1,648,666 412,166-- - -2,185,771 C0033 Los Angeles Avenue Undergrounding26,694 - 441,307-- - -468,001 C0035 Arroyo Drive Overlay 656 85,856 450,488-- - -537,000 C0037 Arroyo Drive Bike/Ped Project13,144 145,000 871,856-- - -1,030,000 C0042 Arroyo Vista Recreation Center Facility Expansion- - 150,000-- - -150,000 C0047 AVCP Storage Facility- - 80,000-- - -80,000 C0048 Arroyo Vista Recreation Center Gym Expansion Project- - - 2,450,000 - - - 2,450,000 C0050 Streetlights Acquisition and Retrofit1,979,927 72,624 - -- - - 2,052,550 C0052 North Train Station Public Art- 2,250 197,750 -- - - 200,000 C0053 Championship Drive Sidewalk and Trail Improvements - -295,000 -- - - 295,000 C0056 New Moorpark City Library 186,005 1,649,734 2,051,060 18,000,000 - - - 21,886,798 C0060 Traffic Signal Improvements at Spring (Charles & Second)- - - -- - - - C0061 Arroyo Simi Trail Plan- - 120,000 -850,000 - - 970,000 C0062 80 Acre Parcel Trail Project29,704 23,278 - -- - - 52,981 C0063 Inclusive Playground at Tierra Rejada Park116,994 18,196 1,764,810 -- - - 1,900,000 C0064 Replace Play Equipment at Community Center Park- - 215,000 -- - - 215,000 C0065 City Entry Monument Signage- 156,275 - -- - - 156,275 C0066 Campus Park Playground Upgrades- -460,000 -- - - 460,000 C0067Replace Play Equpment at Glenwood Park- -250,000 -- - - 250,000 C0068 High Street Arts Center Roofing Replacement- 251,275 - -- - - 251,275 C0070 City Hall at 323 Science Drive- 7,267,666 169,548 -- - - 7,437,214 C0071 Lease SCE Property Adjacent to AVCP- -65,000-1,935,000 - - 2,000,000 C0072 Additional Softball Fencing at Mountain Meadows Park- -50,000--- - 50,000 M0002 ADA Improvements 38,702 - 186,299--- - 225,000 M0024 Arroyo Vista Recreation Center HVAC Replacement 49,005 406,913 55,132--- - 511,050 M0025 Arroyo Vista Recreation Center Kitchen Remodel - - 300,000--- - 300,000 M0029 Sidewalk Reconstruction Project- - 50,000--- - 50,000 M0033 Traffic Signal Cabinet Upgrades65,468 - 73,222--- - 138,690 M0040 Los Angeles Avenue Traffic Signals/Fiber Optic Upgrade 14,345 - 935,655--- - 950,000 M0044 Park & Facility Pavement Rehabilitation- - 448,900 --- - 448,900 M0045 Princeton Ave/Campus Park Dr Landscape Renovation - - 1,085,000 --- - 1,085,000 M0046 Los Angeles Ave Landscape Renovation- - 545,000 --- - 545,000 M0050 Sidewalk Rehabilitation RDA Project Area- 263,324 - -- - - 263,324 M0052 Moorpark Highlands Slope Naturalization10,047 33,816 - -- - - 43,862 M0053 Replace Skate Park Fencing at Poindexter Park- - 100,000 -- - - 100,000 P0011 Bus Shelter and Other Bus Stop Amenities25,850 - 31,768-- - - 57,618 Page 4 of 1448 CITY OF MOORPARKFIVE-YEAR CAPITAL IMPROVEMENT PROJECTS SUMMARYFISCAL YEAR 2022/23 THRU 2026/27Project Number Project Title Prior Years Actual thru FY20/21 FY21/22 CY Estimate FY22/23 Recommended FY23/24Projected FY24/25 Projected FY25/26 Projected FY26/27 Projected Projected Project Cost Thru 26/27 Page R0030 Arroyo Vista Community Park EV Charger- 55,538 - - - - - 55,538 Arroyo Drive Railroad Crossing Improvements- - - - - 1,000,000 - 1,000,000 Drainage Masterplan Update - - - 150,000 - - - 150,000 Shasta Drain - - - - - - 800,000 800,000 AVCP Water Spray Attraction - - - - 665,000 - - 665,000 Replace Playground Equipment at Magnolia Park- - - - 175,000 - - 175,000 Replace Playground Equipment at Mountain Meadow Park- - - - 225,000 - - 225,000 Replace Playground Equipment at Peach Hill Park- - - 135,000 - - - 135,000 Replace Playground Equipment at Tierra Rejada Park- - - 400,000 - - - 400,000 Replace Playground Equipment at Villa Campesina Park- - - 250,000 - - - 250,000 Replace Playground Equipment at Virginia Colony Park- - - - 200,000 - - 200,000 Disc Golf Course - - - 150,000 - - - 150,000 Total17,432,909 13,606,076 34,410,357 23,905,755 4,050,000 1,000,000 3,020,000 97,425,097 *FY22/23 Budget includes FY21/22 Estimated Carryover Amount ($30,365,733) and FY22/23 Appropriation Amount ($4,044,624).Page 5 of 1449 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: C0003 - MILLARD DRAIN Project: C0003 - MILLARD DRAIN MILLARD DRAIN - CAPITAL - PROF SVC 250,0003005-311-C0003-55300 0 0 250,000 250,0000 250,000 0 0 250,000 250,0000Project: C0003 - MILLARD DRAIN Total: Project: C0004 - MRPK AV WIDE/CASEY TO 3RD MRPK AV WIDE/CASEY-3RD - LAND ACQUISITION 101,6482002-311-C0004-55100 0 0 101,648 101,6480 101,648 0 0 101,648 101,6480Project: C0004 - MRPK AV WIDE/CASEY TO 3RD Total: Project: C0009 - HIGH STREET STREETSCAPE HIGH ST STREETSCAPE - INFRASTRUCTURES 1,420,0003005-311-C0009-55200 0 0 1,420,000 1,420,0000 HIGH ST STREETSCAPE - CAPITAL-PROF SVC 80,0003005-311-C0009-55300 0 0 80,000 80,0000 1,500,000 0 0 1,500,000 1,500,0000Project: C0009 - HIGH STREET STREETSCAPE Total: Project: C0012 - CIVIC CENTER COMPLEX CIVIC CTR - CAPITAL-PROF SVC 93,5152018-120-C0012-55300 0 93,515 0 098,326 CIVIC CTR - BLDG & STRUCT ACQ 83,3303001-120-C0012-55210 0 0 83,330 83,3301,712 CIVIC CTR - CAPITAL-PROF SVC 207,6763001-120-C0012-55300 12,193 194,784 12,893 12,893310,280 384,521 410,318 288,298 96,222 96,22212,193Project: C0012 - CIVIC CENTER COMPLEX Total: Project: C0014 - CIVIC CTR PED ACCESS IMPR CIV CTR PED ACC IMPR - CAPITAL-PROF SVC 4,3712001-171-C0014-55300 0 0 4,371 4,371813 CIV CTR PED ACC IMPR - IMPRV OTHER THAN BLDG 111,7402001-171-C0014-55500 0 0 111,740 111,74045,403 CIV CTR PED ACC IMPR - CAPITAL-PROF SVC 4,3712411-171-C0014-55300 0 0 4,371 4,3710 CIV CTR PED ACC IMPR - IMPRV OTHER THAN BLDG 111,7402411-171-C0014-55500 0 0 111,740 111,7400 232,222 46,216 0 232,222 232,2220Project: C0014 - CIVIC CTR PED ACCESS IMPR Total: Project: C0019 - CENTRAL IRRIGATION SYSTEM CENTRAL IRRIG SYS - IMPRV OTHER THAN BLDG 11,6971000-541-C0019-55500 73,303 0 0 01,059 BUDGET NOTES SUBJECT DESCRIPTIONBUDGET CODE RECOMMENDED RECOMMENDED INSTALLATION OF CONTROLLERS, FLOW SENSORS AND MASTER VALVES AT AVCP & MILLER PARKS. 11,697 1,059 0 0 073,303Project: C0019 - CENTRAL IRRIGATION SYSTEM Total: Page 6 of 144 10 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: C0020 - PRINCETON AVE IMPROVEMENT PROJ (FORMERLY WIDENING) Project: C0020 - PRINCETON AVE IMPROVEMENT PROJ (FORMERLY WIDENING) PRINCETON AV IMPROV - NFRASTRUCTURES 450,0001000-311-C0020-55200 0 0 450,000 450,0000 PRINCETON AV IMPROV - INFRASTRUCTURES 527,5652002-311-C0020-55200 0 0 527,565 527,5650 PRINCETON AV IMPROV - CAPITAL-PROF SVC 1,822,4352002-311-C0020-55300 0 0 1,822,435 1,822,4351,677,918 PRINCETON AV IMPROV - LAND ACQUISITION 66,5852014-311-C0020-55100 48 65,942 643 64365,942 PRINCETON AV IMPROV - INFRASTRUCTURES 7,274,9512014-311-C0020-55200 9,173 (5,574)7,280,524 7,280,524(5,573) PRINCETON AV IMPROV - BLDG & STRUCT ACQ 6012014-311-C0020-55210 0 0 601 6010 PRINCETON AV IMPROV - CAPITAL-PROF SVC 127,2242014-311-C0020-55300 116,523 124,000 3,224 3,224124,006 PRINCETON AV IMPROV - INFRASTRUCTURES 1,744,2202409-311-C0020-55200 0 0 1,744,220 1,744,2200 PRINCETON AV IMPROV - INFRASTRUCTURES 600,0002416-311-C0020-55200 0 0 600,000 600,0000 ARPA-CLFR - PRINCETON AV IMPROV - INFRASTRUCTURES 5,688,7982800-311-C0020-55200 0 250,000 5,438,798 5,438,7980 18,302,379 1,862,293 434,368 17,868,011 17,868,011125,744Project: C0020 - PRINCETON AVE IMPROVEMENT PROJ (FORMERLY WIDENING) Total: Project: C0021 - LA AVE WIDEN - SPRING/MPK LA AV WIDE-SPRING/MPK - LAND ACQUISITION 810,0002014-311-C0021-55100 0 803,000 7,000 7,000802,625 LA AV WIDE-SPRING/MPK - INFRASTRUCTURES 418,0332014-311-C0021-55200 0 0 418,033 418,0330 LA AV WIDE-SPRING/MPK - CAPITAL-PROF SVC 500,9222014-311-C0021-55300 2,180 0 500,922 500,922431,604 LA AV WIDE-SPRING/MPK - INFRASTRUCTURES 796,7702401-311-C0021-55200 0 0 796,770 796,7700 2,525,725 1,234,230 803,000 1,722,725 1,722,7252,180Project: C0021 - LA AVE WIDEN - SPRING/MPK Total: Project: C0022 - SPRING ROAD WIDENING SPRING RD WIDE - LAND ACQUISITION 81,3142014-311-C0022-55100 0 0 81,314 81,3140 SPRING RD WIDE - INFRASTRUCTURES 625,6202014-311-C0022-55200 0 0 625,620 625,6200 SPRING RD WIDE - CAPITAL-PROF SVC 67,6352014-311-C0022-55300 0 0 67,635 67,63562,039 774,568 62,039 0 774,568 774,5680Project: C0022 - SPRING ROAD WIDENING Total: Project: C0026 - LA AVE MEDIANS LA AVE MEDIANS - CAPITAL-PROF SVC 02014-311-C0026-55300 0 0 0 061,747 0 61,747 0 0 00Project: C0026 - LA AVE MEDIANS Total: Project: C0029 - METROLINK S LOT NEW ENTRY METROLK SLOT NEW ENTRY - INFRASTRUCTURES 02001-311-C0029-55200 1 0 0 00 Page 7 of 144 11 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: C0029 - METROLINK S LOT NEW ENTRY METROLK SLOT NEW ENTRY - CAPITAL-PROF SVC 02001-311-C0029-55300 21,447 0 0 00 METROLK SLOT NEW ENTRY - INFRASTRUCTURES 02413-311-C0029-55200 26,450 0 0 00 METROLK SLOT NEW ENTRY - INFRASTRUCTURES 02414-311-C0029-55200 161,983 0 0 00 0 0 0 0 0209,882Project: C0029 - METROLINK S LOT NEW ENTRY Total: Project: C0030 - WIDENING @ LA AVE/SHASTA WIDE @ LA AV/SHASTA - CAPITAL-PROF SVC 49,5582014-311-C0030-55300 0 0 10,000 10,0000 49,558 0 0 10,000 10,0000Project: C0030 - WIDENING @ LA AVE/SHASTA Total: Project: C0032 - METROLINK NORTH PARKING METROLK N PARKING - INFRASTRUCTURES 200,0002001-430-C0032-55200 0 160,000 40,000 40,000158,689 METROLK N PARKING - CAPITAL-PROF SVC (686)2001-430-C0032-55300 13,556 0 0 04,500 METROLK N PARKING - INFRASTRUCTURES 25,2312413-430-C0032-55200 0 20,185 5,046 5,04625,231 METROLK N PARKING - INFRASTRUCTURES 700,0002414-430-C0032-55200 0 560,000 140,000 140,000700,000 MLINK N PARK LOT - INFRASTRUCTURE 7,3252417-430-C0032-55200 0 5,860 1,465 1,4657,325 METROLK N PARKING - INFRASTRUCTURES 1,022,9012434-430-C0032-55200 0 818,321 204,580 204,5801,022,901 METROLK N PARKING - CAPITAL-PROF SVC 105,3752434-430-C0032-55300 29,405 84,300 21,075 21,075106,695 2,060,146 2,025,341 1,648,666 412,166 412,16642,961Project: C0032 - METROLINK NORTH PARKING Total: Project: C0033 - NEW LA AVE UNDERGROUNDING NEW LA AV UNDERGRD - CAPITAL-PROF SVC 2862001-311-C0033-55300 0 0 286 2860 NEW LA AV UNDERGRD - INFRASTRUCTURES 308,0002014-311-C0033-55200 0 0 308,000 308,0000 NEW LA AV UNDERGRD - CAPITAL-PROF SVC 133,0212014-311-C0033-55300 0 0 133,021 133,0219,755 441,307 9,755 0 441,307 441,3070Project: C0033 - NEW LA AVE UNDERGROUNDING Total: Project: C0035 - ARROYO DRIVE OVERLAY ARROYO DRIVE OVERLAY - INFRASTRUCTURES 446,3442412-311-C0035-55200 0 0 446,344 446,3440 ARROYO DRIVE OVERLAY - PROFESSIONAL SERVICES 90,0002412-311-C0035-55300 0 85,856 4,144 4,14485,856 536,344 85,856 85,856 450,488 450,4880Project: C0035 - ARROYO DRIVE OVERLAY Total: Project: C0037 - ARROYO DR BIKE/PED PROJ ARROYO DR BIKE/PED - INFRASTRUCTURES 200,0002001-311-C0037-55200 0 0 200,000 200,0000 ARROYO DR BIKE/PED - CAP PROF SVC 68,8202001-311-C0037-55300 0 45,000 23,820 23,82067,724 Page 8 of 144 12 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: C0037 - ARROYO DR BIKE/PED PROJ ARROYO DR BIKE/PED - INFRASTRUCTURES 216,8562411-311-C0037-55200 0 0 216,856 216,8560 ARROYO DR BIKE/PED - CAP PROF SVC 531,1802411-311-C0037-55300 0 100,000 431,180 431,180172,692 1,016,856 240,416 145,000 871,856 871,8560Project: C0037 - ARROYO DR BIKE/PED PROJ Total: Project: C0042 - AVRC FACILITY EXPANSION AVRC FACILITY EXP - DESIGN/ENGINEERING 150,0002018-171-C0042-55300 0 0 150,000 150,0000 150,000 0 0 150,000 150,0000Project: C0042 - AVRC FACILITY EXPANSION Total: Project: C0047 - AVCP STORAGE FACILITY AVCP STORAGE FAC - CAP PROF SVC 20,0002010-541-C0047-55300 0 0 20,000 20,0000 AVCP STORAGE FAC - CONSTRUCTION BLDG 60,0002010-541-C0047-55400 0 0 60,000 60,0000 80,000 0 0 80,000 80,0000Project: C0047 - AVCP STORAGE FACILITY Total: Project: C0050 - SCE STREETLIGHTS-ACQUISITION SCE STLIGHT ACQ - INFRASTRUCTURE 52,8901000-312-C0050-55200 163,094 50,712 2,179 050,711 SCE STLIGHT ACQ - INFRASTRUCTURE 21,9122415-312-C0050-55200 0 21,912 0 021,911 74,802 72,623 72,624 2,179 0163,094Project: C0050 - SCE STREETLIGHTS-ACQUISITION Total: Project: C0052 - NORTH TRAIN STATION PUBLIC ART N TRAIN STN PUBLIC ART - IMPROV OTHER THAN BLDG 200,0002007-511-C0052-55500 0 2,250 197,750 197,750490 200,000 490 2,250 197,750 197,7500Project: C0052 - NORTH TRAIN STATION PUBLIC ART Total: Project: C0053 - CHAMPIONSHIP DR TRAIL EAST SIDEWALK CHAMPIONSHIP DR TRAIL SIDEWALK - INFRASTRUCTURE 250,0002315-542-C0053-55200 0 0 250,000 250,0000 CHAMPIONSHIP DR TRAIL SIDEWALK - CAP PROF SVC 45,0002315-542-C0053-55300 0 0 45,000 45,0000 295,000 0 0 295,000 295,0000Project: C0053 - CHAMPIONSHIP DR TRAIL EAST SIDEWALK Total: Project: C0056 - NEW LIBRARY BLDG NEW LIBRARY-CAPITAL PROF SVC 1,700,7933001-171-C0056-55300 175,705 1,649,734 2,051,060 2,051,0601,649,265 1,700,793 1,649,265 1,649,734 2,051,060 2,051,060175,705Project: C0056 - NEW LIBRARY BLDG Total: Project: C0060 - TRAFFIC SIGNAL IMPROVE @ SPRING RD (CHARLES & SECO SIG IMPRV SPRING/CHARLES/SECOND - INFRASTRUCTURES 100,0002014-311-C0060-55200 0 0 100,000 00 Page 9 of 144 13 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: C0060 - TRAFFIC SIGNAL IMPROVE @ SPRING RD (CHARLES & SECO SIG IMPRV SPRING/CHARLES/SECOND - CAP PROF SVCS 25,0002014-311-C0060-55300 0 0 25,000 00 125,000 0 0 125,000 00Project: C0060 - TRAFFIC SIGNAL IMPROVE @ SPRING RD (CHARLES & SECO Total: Project: C0061 - ARROYO SIMI TRAIL IMPROVEMENTS ARROYO SIMI TRAIL IMPRV - CAPITAL PROF SVC 120,0002018-542-C0061-55300 0 0 120,000 120,0000 120,000 0 0 120,000 120,0000Project: C0061 - ARROYO SIMI TRAIL IMPROVEMENTS Total: Project: C0062 - 80AC-TRAIL & TRAILHEAD IMPROVEMENT 80AC TRAIL/TRAILHEAD IMPROV - CAP PROF SVCS 23,2782018-173-C0062-55300 0 23,278 0 023,277 23,278 23,277 23,278 0 00Project: C0062 - 80AC-TRAIL & TRAILHEAD IMPROVEMENT Total: Project: C0063 - ALL INCLUSIVE PLAYGROUND @ TIERRA REJAD PK ALL INCLSV PLAY GRND @TR - CAP PROF SVCS 5,1611000-541-C0063-55300 735 5,131 30 305,131 PLAY GRND @TR - IMPRV OTHR THAN BLDG 300,0002007-541-C0063-55500 0 0 300,000 450,0000 ALL INCLSV PLAY GRND @TR - CAP PROF SVC 13,8452010-541-C0063-55300 10,780 13,065 780 78013,065 ALL INCLSV PLAY GRND @TR - IMPRV OTHR THAN BLDG 1,314,0002010-541-C0063-55500 0 0 1,314,000 1,314,0000 1,633,006 18,196 18,196 1,614,810 1,764,81011,515Project: C0063 - ALL INCLUSIVE PLAYGROUND @ TIERRA REJAD PK Total: Project: C0064 - COMMUNITY CTR PK PLAYGRND IMPROV/EQUIP REPLC COMM CTR PK PLYGRND IMPRV/RPLC-IMPRV OTHR THN BL…90,0002011-541-C0064-55500 0 0 90,000 90,0000 BUDGET DETAIL DESCRIPTION UNITS PRICE AMOUNTBUDGET CODE RECOMMENDED PARKING LOT IMPROVEMENTS 0.00 0.00 75,000 RECOMMENDED REPLACE SAND W/ ENGINEERED WOOD FIBER 0.00 0.00 15,000 COMM CTR PK PLYGRND IMPRV/RPLC - MACHINE&EQUP 125,0003003-541-C0064-55000 0 0 125,000 125,0000 BUDGET DETAIL DESCRIPTION UNITS PRICE AMOUNTBUDGET CODE RECOMMENDED REPLACE PLAY STRUCTURES/EQUIPMENT 0.00 0.00 125,000 215,000 0 0 215,000 215,0000Project: C0064 - COMMUNITY CTR PK PLAYGRND IMPROV/EQUIP REPLC Total: Project: C0065 - CITY ENTRY MONUMENT SIGNAGE MONUMENT SIGN - IMPROVE OTHER THAN BUDG 106,2751000-542-C0065-55500 0 106,275 0 086,275 MONUMENT SIGN - IMPROVE OTHER THAN BLDG 25,0002007-542-C0065-55500 0 25,000 0 025,000 Page 10 of 144 14 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: C0065 - CITY ENTRY MONUMENT SIGNAGE ,MONUMENT SIGN - IMPROVE OTHER THAN BLDG 25,0002018-542-C0065-55500 0 25,000 0 025,000 156,275 136,275 156,275 0 00Project: C0065 - CITY ENTRY MONUMENT SIGNAGE Total: Project: C0066 - CAMPUS PARK PLAYGROUND AREA UPGRADES (2021) CMPS PK PLYGRND UPGD - IMPRV OTHR THN BLDG 330,0002011-541-C0066-55500 0 0 330,000 330,0000 CMPS PK PLYGRND UPGD - MACHINE&EQUP 130,0003003-541-C0066-55000 0 0 130,000 130,0000 460,000 0 0 460,000 460,0000Project: C0066 - CAMPUS PARK PLAYGROUND AREA UPGRADES (2021) Total: Project: C0067 - GLENWOOD PK PLAY EQUIPMENT REPLACEMENT GLNWD PK PLY EQUP - IMPROVE OTHER THAN BLDG 120,0002013-541-C0067-55500 0 0 120,000 120,0000 GLNWD PK PLY EQUIP - MACHINE&EQUP 130,0003003-541-C0067-55000 0 0 130,000 130,0000 250,000 0 0 250,000 250,0000Project: C0067 - GLENWOOD PK PLAY EQUIPMENT REPLACEMENT Total: Project: C0068 - HSAC ROOFING REPLACEMENT HSAC ROOF - IMPROVE OTHER THAN BLDG 251,2751000-171-C0068-55500 0 251,275 0 00 251,275 0 251,275 0 00Project: C0068 - HSAC ROOFING REPLACEMENT Total: Project: C0069 - MPSF ASPHALT REPAIR AND SLURRY MPSF ASPHALT/SLURRY-IMPRV OTHR THN BLDG 38,0001000-171-C0069-55500 0 0 0 00 38,000 0 0 0 00Project: C0069 - MPSF ASPHALT REPAIR AND SLURRY Total: Project: C0070 - CITY HALL AT 323 SCIENCE DRIVE CITY HALL AT 323 SCIENCE DRIVE - CAPITAL-PROF SVC 301,7301000-120-C0070-55300 0 301,730 0 0301,730 CITY HALL AT 323 SCIENCE DRIVE - BLDG & STRUCT ACQ 7,085,4843001-120-C0070-55210 0 6,965,936 169,548 169,5486,680,592 CITY HALL AT 323 SCIENCE DRIVE - CAPITAL-PROF SVC 50,0003001-120-C0070-55300 0 0 0 044,750 7,437,214 7,027,072 7,267,666 169,548 169,5480Project: C0070 - CITY HALL AT 323 SCIENCE DRIVE Total: Project: C0071 - Lease SCE Property Adjacent to AVCP LEASE SCE PROPERTY ADJ TO AVCP - CAPITAL PROF SVC 02018-541-C0071-55300 0 0 65,000 00 LEASE SCE PROPERTY ADJ TO AVCP - CAPITAL PROF SVC 03004-541-C0071-55300 0 0 0 65,0000 0 0 0 65,000 65,0000Project: C0071 - Lease SCE Property Adjacent to AVCP Total: Page 11 of 144 15 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: C0072 - SOFTBALL FENCING AT MOUNTAIN MEADOWS PARK Project: C0072 - SOFTBALL FENCING AT MOUNTAIN MEADOWS PARK MTN MEADOWS PK - IMPRV OTHER THAN BLDG 02010-541-C0072-55500 0 0 0 50,0000 0 0 0 0 50,0000Project: C0072 - SOFTBALL FENCING AT MOUNTAIN MEADOWS PARK Total: Project: M0002 - ADA IMPROVEMENTS (2011/12) ADA IMPROVEMENTS - IMPRV OTHER THAN BLDG 61,2991000-171-M0002-55500 0 0 86,299 186,2990 61,299 0 0 86,299 186,2990Project: M0002 - ADA IMPROVEMENTS (2011/12) Total: Project: M0023 - AVRC BACK UP GENERATORS AVRC B-U GENERATORS - IMPRV OTHER THAN BLDG 95,0002010-171-M0023-55500 0 0 0 00 AVRC B U GENERATORS-IMPRV OTHER THAN BLDG 167,0003003-171-M0023-55500 0 0 0 00 262,000 0 0 0 00Project: M0023 - AVRC BACK UP GENERATORS Total: Project: M0024 - AVRC HVAC REPLACEMENT AVRC HVAC REPLAC - CAPITAL PROF SVC 13,9952018-171-M0024-55300 0 13,613 382 38213,613 AVRC HVAC REPLAC - IMPRV OTHER THAN BLDG 95,0002018-171-M0024-55500 0 40,250 54,750 54,75040,250 AVRC HVAC REPLAC - IMPRV OTHER THAN BLDG 353,0503003-171-M0024-55500 0 353,050 0 0353,050 462,045 406,913 406,913 55,132 55,1320Project: M0024 - AVRC HVAC REPLACEMENT Total: Project: M0025 - AVRC KITCHEN REMODEL AVRC REMODEL - CAPITAL PROF SVC 50,0002018-171-M0025-55300 0 0 50,000 50,0000 ACRC REMODEL - IMPRV OTHER THAN BLDG 250,0002018-171-M0025-55500 0 0 250,000 250,0000 300,000 0 0 300,000 300,0000Project: M0025 - AVRC KITCHEN REMODEL Total: Project: M0029 - SIDEWALK RECONSTRUCTION PROGRAM SIDEWLK RECONSTR PROG - INFRASTRUCTURE 50,0002412-311-M0029-55200 0 0 50,000 50,0000 50,000 0 0 50,000 50,0000Project: M0029 - SIDEWALK RECONSTRUCTION PROGRAM Total: Project: M0033 - TRAFFIC SIGNAL CABINET UPGRADES TRF SIGNAL UPGRD-INFRASTRUCTURE 73,2222412-311-M0033-55200 65,468 0 73,222 73,2220 73,222 0 0 73,222 73,22265,468Project: M0033 - TRAFFIC SIGNAL CABINET UPGRADES Total: Project: M0040 - LA AVE TRAFFIC SIGNALS/FIBER OPTIC UPGRADE LA AV TRAF SIGNALS/FIB OPTIC UPGRD - INFRASTRUCT 935,6502014-311-M0040-55200 0 0 935,650 935,6500 Page 12 of 144 16 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: M0040 - LA AVE TRAFFIC SIGNALS/FIBER OPTIC UPGRADE LA AVE TRAF SIGNALS/FIB OPTIC UPGRD - CIP PROF SVC 52014-311-M0040-55300 0 0 5 50 935,655 0 0 935,655 935,6550Project: M0040 - LA AVE TRAFFIC SIGNALS/FIBER OPTIC UPGRADE Total: Project: M0044 - PARK & FACILITY PAVEMENT REHAB PAVEMENT REHAB-IMPRV OTH THAN BLDG 01000-171-M0044-55500 0 0 74,624 74,6240 PARK & FACILITY PAVEMENT REHAB - CAPITAL-PROF SVC 70,0001000-541-M0044-55300 0 0 100,000 100,0000 PARK & FACILITY PAVEMENT REHAB-IMPRV OTH THAN BLDG 274,2761000-541-M0044-55500 0 0 274,276 274,2760 344,276 0 0 448,900 448,9000Project: M0044 - PARK & FACILITY PAVEMENT REHAB Total: Project: M0045 - PRINCETON AVE/CAMPUS PK DR LSCAPE RENOV PRINCETON/CMP PK DR LSCAPE-CAPITAL PROF SVC 85,0002006-542-M0045-55300 0 0 85,000 85,0000 PRINCETON/CMP PK DR LSCAPE - TFER TO OTH FUNDS 02006-542-M0045-59010 0 0 0 00 PRINCETON/CMP PL DR LSCAPE-IMPROV OTHER THAN BLDG 02018-542-M0045-55500 0 0 1,000,000 00 PRINCETON/CMP PL DR LSCAPE-IMPROV OTHER THAN BLDG 03004-542-M0045-55500 0 0 0 1,000,0000 85,000 0 0 1,085,000 1,085,0000Project: M0045 - PRINCETON AVE/CAMPUS PK DR LSCAPE RENOV Total: Project: M0046 - LA AVE PKWAY RENOVATION (BET. SPRING & MILLARD) LA AVE PKWAY RENOV - CAPITAL PROF SVC 45,0002006-542-M0046-55300 0 0 45,000 45,0000 LA AVE PKWAY RENOV-IMPROV OTHER THAN BLDG 02018-542-M0046-55500 0 0 500,000 500,0000 45,000 0 0 545,000 545,0000Project: M0046 - LA AVE PKWAY RENOVATION (BET. SPRING & MILLARD) Total: Project: M0047 - 1920 SLURRY SEAL (DOWNTOWN AREA) DOWNTOWN AREA SLURRY SEAL - INFRASTRUCTURE 02412-311-M0047-55200 430,050 0 0 00 DOWNTOWN AREA SLURRY SEAL - INFRASTRUCTURES 02416-311-M0047-55200 843,961 0 0 00 0 0 0 0 01,274,011Project: M0047 - 1920 SLURRY SEAL (DOWNTOWN AREA) Total: Project: M0050 - SIDEWALK REHAB - RDA PROJ AREA SIDEWALK REHAB RDA PROJ AREA-INFRASTRUCTURE 273,3243005-311-M0050-55200 0 263,324 10,000 0273,324 273,324 273,324 263,324 10,000 00Project: M0050 - SIDEWALK REHAB - RDA PROJ AREA Total: Project: M0051 - SLOPE NATURALIZATION-MERIDIAN HILLS SLOPE NATURALIZATION - CAPITAL PROF SVC 02320-542-M0051-55300 10,016 0 0 029,347 0 29,347 0 0 010,016Project: M0051 - SLOPE NATURALIZATION-MERIDIAN HILLS Total: Page 13 of 144 17 5/13/2022 2:04:01 PM 2021-2022 YTD Actual 2021-2022 Budget 2020-2021 Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Budget Worksheet Project: M0052 - SLOPE NATURALIZATION-MOORPARK HIGHLANDS Project: M0052 - SLOPE NATURALIZATION-MOORPARK HIGHLANDS SLOPE NATURALIZATION - CAPITAL PROF SVC 33,8162322-542-M0052-55300 10,047 33,816 0 033,815 33,816 33,815 33,816 0 010,047Project: M0052 - SLOPE NATURALIZATION-MOORPARK HIGHLANDS Total: Project: M0053 - Replace Skate Park Fencing at Poindexter Park REPLACE SKATE FENCING - IMPRV OTHR THN BLDG 02010-541-M0053-55500 0 0 100,000 100,0000 0 0 0 100,000 100,0000Project: M0053 - Replace Skate Park Fencing at Poindexter Park Total: Project: P0011 - CITY TRANSIT BUS SHLT&AMN CITYTRANSIT - IMPRV OTHER THAN BLDG 66,7682414-430-P0011-55500 0 0 31,768 31,7680 66,768 0 0 31,768 31,7680Project: P0011 - CITY TRANSIT BUS SHLT&AMN Total: Project: R0030 - ARROYO VISTA COMMUNITY PARK AVCP - IMPRV OTHER THAN BLDG 55,5382001-541-R0030-55500 0 55,538 0 055,538 55,538 55,538 55,538 0 00Project: R0030 - ARROYO VISTA COMMUNITY PARK Total: 44,444,556 13,606,076 34,247,535 34,410,35615,765,4132,176,119Report Total: Page 14 of 144 18 Budget Worksheet 5/13/2022 2:04:01 PM Group Summary Projec… 2021-2022 YTD Activity 2021-2022 Total Budget Defined Budgets 2020-2021 Total Activity 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended C0003 - MILLARD DRAIN 250,000 0 0 250,000 250,0000 C0004 - MRPK AV WIDE/CASEY TO 3RD 101,648 0 0 101,648 101,6480 C0009 - HIGH STREET STREETSCAPE 1,500,000 0 0 1,500,000 1,500,0000 C0012 - CIVIC CENTER COMPLEX 384,521 410,318 288,298 96,222 96,22212,193 C0014 - CIVIC CTR PED ACCESS IMPR 232,222 46,216 0 232,222 232,2220 C0019 - CENTRAL IRRIGATION SYSTEM 11,697 1,059 0 0 073,303 C0020 - PRINCETON AVE IMPROVEMENT PROJ (FORMERLY WIDENING)18,302,379 1,862,293 434,368 17,868,011 17,868,011125,744 C0021 - LA AVE WIDEN - SPRING/MPK 2,525,725 1,234,230 803,000 1,722,725 1,722,7252,180 C0022 - SPRING ROAD WIDENING 774,568 62,039 0 774,568 774,5680 C0026 - LA AVE MEDIANS 0 61,747 0 0 00 C0029 - METROLINK S LOT NEW ENTRY 0 0 0 0 0209,882 C0030 - WIDENING @ LA AVE/SHASTA 49,558 0 0 10,000 10,0000 C0032 - METROLINK NORTH PARKING 2,060,146 2,025,341 1,648,666 412,166 412,16642,961 C0033 - NEW LA AVE UNDERGROUNDING 441,307 9,755 0 441,307 441,3070 C0035 - ARROYO DRIVE OVERLAY 536,344 85,856 85,856 450,488 450,4880 C0037 - ARROYO DR BIKE/PED PROJ 1,016,856 240,416 145,000 871,856 871,8560 C0042 - AVRC FACILITY EXPANSION 150,000 0 0 150,000 150,0000 C0047 - AVCP STORAGE FACILITY 80,000 0 0 80,000 80,0000 C0050 - SCE STREETLIGHTS-ACQUISITION 74,802 72,623 72,624 2,179 0163,094 C0052 - NORTH TRAIN STATION PUBLIC ART 200,000 490 2,250 197,750 197,7500 C0053 - CHAMPIONSHIP DR TRAIL EAST SIDEWALK 295,000 0 0 295,000 295,0000 C0056 - NEW LIBRARY BLDG 1,700,793 1,649,265 1,649,734 2,051,060 2,051,060175,705 C0060 - TRAFFIC SIGNAL IMPROVE @ SPRING RD (CHARLES & SECO 125,000 0 0 125,000 00 C0061 - ARROYO SIMI TRAIL IMPROVEMENTS 120,000 0 0 120,000 120,0000 C0062 - 80AC-TRAIL & TRAILHEAD IMPROVEMENT 23,278 23,277 23,278 0 00 C0063 - ALL INCLUSIVE PLAYGROUND @ TIERRA REJAD PK 1,633,006 18,196 18,196 1,614,810 1,764,81011,515 C0064 - COMMUNITY CTR PK PLAYGRND IMPROV/EQUIP REPLC 215,000 0 0 215,000 215,0000 C0065 - CITY ENTRY MONUMENT SIGNAGE 156,275 136,275 156,275 0 00 Page 15 of 144 19 Budget Worksheet 5/13/2022 2:04:01 PM Projec… 2021-2022 YTD Activity 2021-2022 Total Budget Defined Budgets 2020-2021 Total Activity 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended C0066 - CAMPUS PARK PLAYGROUND AREA UPGRADES (2021)460,000 0 0 460,000 460,0000 C0067 - GLENWOOD PK PLAY EQUIPMENT REPLACEMENT 250,000 0 0 250,000 250,0000 C0068 - HSAC ROOFING REPLACEMENT 251,275 0 251,275 0 00 C0069 - MPSF ASPHALT REPAIR AND SLURRY 38,000 0 0 0 00 C0070 - CITY HALL AT 323 SCIENCE DRIVE 7,437,214 7,027,072 7,267,666 169,548 169,5480 C0071 - Lease SCE Property Adjacent to AVCP 0 0 0 65,000 65,0000 C0072 - SOFTBALL FENCING AT MOUNTAIN MEADOWS PARK 0 0 0 0 50,0000 M0002 - ADA IMPROVEMENTS (2011/12)61,299 0 0 86,299 186,2990 M0023 - AVRC BACK UP GENERATORS 262,000 0 0 0 00 M0024 - AVRC HVAC REPLACEMENT 462,045 406,913 406,913 55,132 55,1320 M0025 - AVRC KITCHEN REMODEL 300,000 0 0 300,000 300,0000 M0029 - SIDEWALK RECONSTRUCTION PROGRAM 50,000 0 0 50,000 50,0000 M0033 - TRAFFIC SIGNAL CABINET UPGRADES 73,222 0 0 73,222 73,22265,468 M0040 - LA AVE TRAFFIC SIGNALS/FIBER OPTIC UPGRADE 935,655 0 0 935,655 935,6550 M0044 - PARK & FACILITY PAVEMENT REHAB 344,276 0 0 448,900 448,9000 M0045 - PRINCETON AVE/CAMPUS PK DR LSCAPE RENOV 85,000 0 0 1,085,000 1,085,0000 M0046 - LA AVE PKWAY RENOVATION (BET. SPRING & MILLARD)45,000 0 0 545,000 545,0000 M0047 - 1920 SLURRY SEAL (DOWNTOWN AREA)0 0 0 0 01,274,011 M0050 - SIDEWALK REHAB - RDA PROJ AREA 273,324 273,324 263,324 10,000 00 M0051 - SLOPE NATURALIZATION-MERIDIAN HILLS 0 29,347 0 0 010,016 M0052 - SLOPE NATURALIZATION-MOORPARK HIGHLANDS 33,816 33,815 33,816 0 010,047 M0053 - Replace Skate Park Fencing at Poindexter Park 0 0 0 100,000 100,0000 P0011 - CITY TRANSIT BUS SHLT&AMN 66,768 0 0 31,768 31,7680 R0030 - ARROYO VISTA COMMUNITY PARK 55,538 55,538 55,538 0 00 44,444,556 13,606,076 34,247,535 34,410,35615,765,413Report Total:2,176,119 Page 16 of 144 20 Budget Worksheet Fund Summary 5/13/2022 2:04:01 PM 2020-2021 Actual 2021-2022 Budget 2021-2022 YTD Actual 2021-2022 CY Estimate 2022-2023 Request 2022-2023 Recommended Defined Budgets Fund 1000 - GENERAL FUND 1,622,603 715,123 987,407 1,085,229444,906237,133 2001 - TRAFFIC SYSTM MGMT FUND 640,069 260,538 380,217 380,217332,66835,004 2002 - CITY-WIDE TRAFFIC MITIGAT 2,451,648 0 2,451,648 2,451,6481,677,9180 2006 - TREE AND LANDSCAPE FEES 130,000 0 130,000 130,00000 2007 - ART IN PUBLIC PLACES 525,000 27,250 497,750 647,75025,4900 2010 - COMMUNITY WIDE PARK DEVT 1,502,845 13,065 1,494,780 1,544,78013,06510,780 2011 - PARK IMPROVEMENT ZONE 2017-1 420,000 0 420,000 420,00000 2013 - PARK IMPROVEMENT ZONE 2017-2 120,000 0 120,000 120,00000 2014 - LOS ANGELES A.O.C.11,524,118 987,368 10,497,192 10,372,1921,552,148127,924 2018 - ENDOWMENT FUND 820,787 195,655 2,190,132 1,125,132200,4660 2315 - COUNTRY CLUB ESTATES 295,000 0 295,000 295,00000 2320 - MERIDIAN HILLS 0 0 0 029,34710,016 2322 - MOORPARK HIGHLANDS 33,816 33,816 0 033,81510,047 2401 - TEA 21 FEDERAL GRANTS 796,770 0 796,770 796,77000 2409 - FEDERAL & STATE GRANTS 1,744,220 0 1,744,220 1,744,22000 2411 - LOCAL TDA ARTICLE 3 864,147 100,000 764,147 764,147172,6920 2412 - LOCAL TDA ARTICLE 8A 659,566 85,856 573,710 573,71085,856495,518 2413 - STATE TRANSIT ASSISTANCE 25,231 20,185 5,046 5,04625,23126,450 2414 - LOCAL TDA ARTICLE 8C 766,768 560,000 171,768 171,768700,000161,983 2415 - GAS TAX 21,912 21,912 0 021,9110 2416 - ROAD MAINT & REHAB 600,000 0 600,000 600,0000843,961 2417 - STATE OF GOOD REPAIR 7,325 5,860 1,465 1,4657,3250 2434 - PROP 1B-LOCAL STREETS&RDS 1,128,276 902,621 225,655 225,6551,129,59629,405 2800 - AMERICAN RESCUE PLAN ACT (ARPA-CLFR)5,688,798 250,000 5,438,798 5,438,79800 3001 - CITY HALL IMPROVEMENT FUND 9,127,284 8,810,454 2,316,830 2,316,8308,686,599187,898 3003 - EQUIPMENT REPLACEMENT FUND 905,050 353,050 385,000 385,000353,0500 3004 - SPECIAL PROJECTS 0 0 0 1,065,00000 3005 - REMAINING BOND PROCEEDS 2,023,324 263,324 1,760,000 1,750,000273,3240 Report Total:44,444,556 13,606,076 34,247,535 34,410,35615,765,4132,176,119 Page 17 of 144 21 Page 18 of 144 22 Fiscal Year 2022/23 Capital Improvement Budget Detail Including Funding Sources Page 19 of 144 23 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 250,000$ 250,000$ 460,000$ 460,000$ 50,000$ 50,000Project TOTAL$ 250,000$ 510,000 $ 760,000Funding Source(s):REMAINING BOND PROCEEDS - Fund 3005 $ 250,000$ 250,000TBD - Fund TBD$ 510,000 TOTAL$ 250,000$ 510,000 $ 760,000Public WorksLocation MapC0003Millard DrainConstruction of storm drainage infrastructure improvements to serve the residential area north of the intersection of Los Angeles Avenue and Millard Street. No funding source has been identified for this project. The full scope and cost of this project has not been determined.Budget Unit Account DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3005-311-C0003-55300 Capital - Professional ServicesTBD-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TTBD-55300 Capital - Professional Services Page 20 of 14424 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number: Council Goals and Objectives: N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 1,268,352 $ 101,648$ 1,370,000$ 134,245 $ 370,755$ 505,000$ 156,708$ 156,708$ 632,737$ 632,737$ 22,500$ 22,500$ 128,675$ 128,675Project TOTAL $ 2,343,217 $ 101,648 $ 370,755 $ 2,815,620Funding Source(s):CITY-WIDE TRAFFIC MITIGAT - Fund 2002 $ 1,402,597 $ 101,648 $ 370,755$ 1,875,000LOS ANGELES A.O.C. - Fund 2014 $ 156,708$ 156,708ENDOWMENT FUND - Fund 2111 $ 783,912$ 783,912 TOTAL $ 2,343,217 $ 101,648 $ 370,755 $ 2,815,620Location MapC0004Moorpark Widening ProjectPublic WorksWidening of Moorpark Avenue to add a southbound lane along the west side from Casey Road to Third Street. Includes street realignment at First Street and Poindexter Avenue (Prior Project 8057) and rail crossing improvements (Prior Project 8038). Prior year appropriations for those projects have been returned to funding sources. Prior to commencing work on this project, the General Plan and Circulation Element must be updated to identify the second southbound lane. Therefore, funding has been moved to Future Years.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountA D D I T I O N A L F U N D I N G R E Q U E S TEstimated TOTALProject Cost 2002-311-C0004-55100 Land Acquisition2002-311-C0004-55300 Capital - Professional Services 2111-311-C0004-55100 Land Acquisition2111-311-C0004-55210 Bldg & Struct Acq2111-311-C0004-55300 Capital - Professional Services2014-311-C0004-55200 InfrastructuresPage 21 of 14425 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number: Council Goals and Objectives: 3.15Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 1,420,000$ 1,420,000$ 80,000$ 80,000$ 1,830,000$ 1,830,000$ 170,000$ 170,000Project TOTAL $ 1,500,000 $ 2,000,000 $ 3,500,000Funding Source(s):REMAINING BOND PROCEEDS - Fund 3005 $ 1,500,000$ 1,500,000TBD - Fund TBD$ 2,000,000$ 2,000,000 TOTAL$ 1,500,000 $ 2,000,000 $ 3,500,000Public WorksLocation MapC0009High Street ImprovementsImprove sidewalks on High Street to include traffic calming devices and street parking improvements. Install new site furnishings.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3005-311-C0009-55200 Infrastructures3005-311-C0009-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TTBD-55200 InfrastructuresTBD-55300 Capital - Professional Services Page 22 of 14426 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 343,172$ 343,172$ 352,645$ 352,645$ 2,700$ 2,700$ 96,138 $ 83,330$ 179,468$ 1,009,003 $ 12,893$ 1,021,896Project TOTAL $ 1,803,658 $ 96,222$ 1,899,880Funding Source(s):ENDOWMENT FUND - Fund 2018 $ 343,172$ 343,172RDA OPERATING FUND (INACTIVE) - Fund 2111 $ 352,645$ 352,645CITY HALL IMPROVEMENT FUND - Fund 3001$ 1,107,841 $ 96,222$ 1,204,064 TOTAL$ 1,803,658 $ 96,222$ 1,899,880 3001-120-C0012-55100 Land Acquisition3001-120-C0012-55210 Bldg & Struct Acq3001-120-C0012-55300 Capital - Professional Services2018-120-C0012-55300 Capital - Professional Services2111-611-C0012-55100 Land AcquisitionEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TAcquisition of property and design and construction of a city hall and civic center complex on the northwest corner of Moorpark Avenue and High Street. Request is for design expenses. Balance of funds to be used in future years for engineering, construction, and associated administrative expenses.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountParks, Recreation & Community ServicesLocation MapC0012New City Hall and Civic Center ComplexPage 23 of 14427 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 34,593 $ 4,371$ 38,964$ 4,562 $ 111,740$ 116,302$ 19,115 $ 4,371$ 23,486$ 111,740$ 111,740Project TOTAL $ 58,270 $ 232,222$ 290,492Funding Source(s):TRAFFIC SYSTM MGMT FUND - Fund 2001 $ 39,155 $ 116,111$ 155,266LOCAL TDA ARTICLE 3 - Fund 2411 $ 19,115 $ 116,111$ 135,226 TOTAL $ 58,270 $ 232,222$ 290,492Parks, Recreation & Community ServicesLocation MapC0014Pedestrian Access Improvements at the Civic CenterCreate ADA accessible pedestrian access from Moorpark Avenue through the Civic Center including an improved bus turnout.Estimated carryover reflects a reduction of $341,984 of TSM Fund (2001) and removal of $20,000 in TDA 8c (2414) to bring expenditures down to local 50% match requirement of Article 3 Fund (2411).Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2001-171-C0014-55300 Capital - Professional Services2001-171-C0014-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2411-171-C0014-55300 Capital - Professional Services2411-171-C0014-55500 Improvements Other Than Bldgs Page 24 of 14428 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 73,303$ 73,303$ 71,599$ 71,599$ 33,111$ 33,111$ 34,466$ 34,466$ 61,937$ 61,937$ 92,406$ 92,406Project TOTAL $ 366,822$ 366,822Funding Source(s):GENERAL FUND - Fund 1000 $ 144,902$ 144,90284-2 STEEPLE HILL T2865 - Fund 2302 $ 33,111$ 33,11184-2 CARLSBERG - Fund 2312 $ 34,466$ 34,466COUNTRY CLUB ESTATES - Fund 2315 $ 61,937$ 61,937MOORPARK HIGHLANDS - Fund 2322 $ 92,406$ 92,406TOTAL $ 366,822$ 366,822Parks, Recreation & Community ServicesLocation MapC0019Central Irrigation SystemVarious Locations CitywidePhase 1 Completed: Intstallation at Peach Hill Park, Mammoth Highlands Park, Lighting & Maintenance Assessment Districts: Zone 2 (Steeple Hill), Zone 5 (Pheasant Run), Zone 10 (Mountain Meadows), Zone 12 (Carlsberg), Zone 15 (Toll Brothers), and Zone 22 (Pardee Homes) accounted for under Capital Outlay Account 55000: $293,519Phase 2: Installation of controllers, flow sensors and master valves at Arroyo Vista Community and Miller Parks. ($74,362)Project CompletedBudget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount1000-541-C0019-55500 Improvements Other Than Bldgs1000-542-C0019-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2302-542-C0019-55000 Machine & Equipments2312-542-C0019-55000 Machine & Equipments2315-542-C0019-55000 Machine & Equipments 2322-542-C0019-55000 Machine & Equipments Page 25 of 14429 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 2,243,159 $ 643$ 2,243,802$ 53,594 $ 7,280,524$ 7,334,118$ 52,310 $ 601$ 52,911$ 1,506,457 $ 3,224$ 1,509,681$ 1,744,220$ 1,744,220$ 1,739$ 1,739$ 600,000$ 600,000$ 450,000$ 450,000$ 527,565$ 527,565$ 1,822,435$ 1,822,435$ 250,000 $ 5,438,798$ 5,688,798Project TOTAL $ 4,107,259 $ 17,868,011$ 21,975,270Funding Source(s):LOS ANGELES A.O.C. - Fund 2014 $ 3,855,520 $ 7,284,993$ 11,140,512FEDERAL & STATE GRANTS - Fund 2409 $ 1,744,220$ 1,744,220GAS TAX - Fund 2415 $ 1,739$ 1,739ROAD MAINT & REHAB - Fund 2416 $ 600,000$ 600,000GENERAL FUND - Fund 1000 $ 450,000$ 450,000CITY-WIDE TRAFFIC MITIGAT - Fund 2002 $ 2,350,000$ 2,350,000PROP 1B-SAFETY & SECURITY - Fund 2800 $ 250,000 $ 5,438,798$ 5,688,798TOTAL $ 4,107,259 $ 17,868,011$ 21,975,270Public WorksLocation MapC0020Princeton Avenue WideningRoad widening, realignment, and reconstruction of Princeton Avenue, from a point east of Spring Road to South Condor Drive. In FY 2009/10, the City was awarded a Bicycle Transportation Account (BTA) in the amount of $206,000 and a Highway Safety Improvement Program (HSIP) in the amount of $900,000. In 2018, VCTC reprogrammed $200,000 in Federal STP-L funds to the project, increasing Federal funds to $1.1 million. In 2022, the City added $456,976 in Federal Highway Infrastructure Program (HIP) funds and $450,000 in reimbursement revenue from Ventura County Waterworks District No. 1Budget Unit Account DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2014-311-C0020-55100 Land Acquisition2014-311-C0020-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2014-311-C0020-55210 Bldg & Struct Acq2014-311-C0020-55300 Capital - Professional Services2409-311-C0020-55200 Infrastructures2415-311-C0020-55100 Land Acquisition2416-311-C0020-55200 Infrastructures1000-311-C0020-55200 Infrastructures2800-311-C0020-55200 Infrastructures2002-311-C0020-55200 Infrastructures2002-311-C0020-55300 Capital - Professional ServicesPage 26 of 14430 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 2,358,112 $ 7,000$ 2,365,112$ 29,395 $ 418,033$ 447,428$ 46,196$ 46,196$ 844,253 $ 500,922$ 1,345,175$ 796,770$ 796,770Project TOTAL $ 3,277,956 $ 1,722,725$ 5,000,681Funding Source(s):LOS ANGELES A.O.C. - Fund 2014 $ 3,277,956 $ 925,955$ 4,203,911TEA 21 FEDERAL GRANTS - Fund 2401 $ 796,770$ 796,770 TOTAL $ 3,277,956 $ 1,722,725$ 5,000,681Public WorksLocation MapC0021Los Angeles Avenue Widening - Spring Road to Moorpark AvenueStreet widening and improvements for additional vehicle travel lanes, an emergency lane, curb and gutter, and sidewalk along the south side of Los Angeles Avenue, from Moorpark Avenue to Spring Road. Project scope of work will also include storm drainage infrastructure improvements along the south side of Los Angeles Avenue and installation of a traffic signal at the intersection of Millard Street/Los Angeles Avenue.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2014-311-C0021-55100 Land Acquisition2014-311-C0021-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2014-311-C0021-55210 Bldg & Struct Acq2014-311-C0021-55300 Capital - Professional Services2401-311-C0021-55200 Infrastructures Page 27 of 14431 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 278,621 $ 81,314$ 359,935$ 44,380 $ 625,620$ 670,000$ 152,365 $ 67,635$ 219,999Project TOTAL $ 475,366 $ 774,568$ 1,249,934Funding Source(s):LOS ANGELES A.O.C. - Fund 2014 $ 475,366 $ 774,568$ 1,249,934 TOTAL $ 475,366 $ 774,568$ 1,249,934Public WorksLocation MapC0022Spring Road WideningWidening of the east side of Spring Road, from Los Angeles Avenue to Flinn Avenue. Widening improvements will also require relocation of the traffic signal pole at the NE corner of Los Angeles Avenue and Spring Road. Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2014-311-C0022-55100 Land Acquisition2014-311-C0022-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2014-311-C0022-55300 Capital - Professional Services Page 28 of 14432 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 192,325$ 192,325Project TOTAL $ 192,325$ 192,325Funding Source(s):CITY-WIDE TRAFFIC MITIGAT - Fund 2002 $ 192,325$ 192,325 TOTAL $ 192,325$ 192,325Public WorksLocation MapC0025Route 23 North AlignmentDesign and construction of a roadway north of Princeton Avenue to connect to Broadway Road. Initial costs are for the development of conceptual design plans. Note, 50% of the design and engineering costs will be funded through the North Hills Parkway Project (C0031). The projected construction cost estimate is $85 million.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2002-311-C0025-55300 Capital - Professional Services Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 29 of 14433 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 240$ 1,710,000$ 1,710,240Project TOTAL $ 240$ 1,710,000 $ 1,710,240Funding Source(s):LOS ANGELES A.O.C. - Fund 2014 $ 240$ 1,710,000$ 1,710,240TOTAL$ 240$ 1,710,000 $ 1,710,240Public WorksLocation MapC0027Underground Utility District No. 2Establishment and implementation of an underground utility district along Los Angeles Avenue, between Shasta Avenue and Millard Street, to underground high voltage overhead transmission lines and remove all poles and overhead wires. SCE Rule 20A monies in the approximate amount of $400,000 are not included in the budget figures shown below.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2014-311-C0027-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 30 of 14434 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 1,601,706$ 1,601,706$ 76,442 $ 10,000$ 86,442Project TOTAL$ 1,678,147 $ 10,000$ 1,688,147Funding Source(s):LOS ANGELES A.O.C. - Fund 2014$ 1,678,147 $ 10,000$ 1,688,147 TOTAL$ 1,678,147 $ 10,000$ 1,688,147Public WorksLocation MapC0030L.A. Avenue Widening at Shasta AvenueThe construction and widening of the south side of Los Angeles Avenue, between Maureen Lane and Leta Yancy Road, along the frontage of the vacant property of Tentative Tract 5882 (Pacific Communities). A traffic signal will be constructed at the intersection of Los Angeles Avenue and Shasta Avenue during the development of Tract 5882 (Pacific Communities). It is the intent of the City to seek reimbursement from the developer of Tract 5882 for costs incurred to implement this project. Construction is complete. The remaining budget is for contingency work required by Caltrans for the final turnover. The contingency amount was reduced from $49,558 to $10,000.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2014-311-C0030-55200 Infrastructures2014-311-C0030-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 31 of 14435 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 644,300$ 644,300$ 872,407$ 872,407$ 56,920$ 56,920$ 242,109$ 242,109$ 158,102$ 158,102Project TOTAL $ 1,973,838$ 1,973,838Funding Source(s):CITY-WIDE TRAFFIC MITIGAT - Fund 2002 $ 1,573,627$ 1,573,627GAS TAX - Fund 2415 $ 400,211$ 400,211 TOTAL $ 1,973,838$ 1,973,838Public WorksLocation MapC0031North Hills ParkwayConstruction of an east-west arterial street north of the railroad corridor, to be generally located within the right-of-way reserved for the previous Route 118 bypass project. Initial costs are for the development of a conceptual design. 50% of design and engineering costs will be funded through Route 23 North Alignment Project (C0025). Project includes 1449 and 1493 Walnut Canyon Road properties. In 2008, a feasibility study prepared by Parsons estimated the total construction cost to be $85 million. This includes costs for actual construction, engineering support, and R/W. The buildout of North Hills Parkway will be dependent on several proposed development projects, including Hitch Ranch, Tract 5906, Tract 5130, Tract 5847, and the Moorpark Movie Studios.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2002-311-C0031-55100 Land Acquisition2002-311-C0031-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2002-311-C0031-55500 Improvements Other Than Bldgs2415-311-C0031-55100 Land Acquisition2415-311-C0031-55300 Capital - Professional Services Page 32 of 14436 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:3.14Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 60,686$ 60,686$ 160,000 $ 40,000$ 200,000$ 822,321 $ 204,580$ 1,026,901$ 144,553 $ 21,075$ 165,629$ 20,185 $ 5,046$ 25,231$ 5,860 $ 1,465$ 7,325$ 560,000 $ 140,000$ 700,000Project TOTAL $ 1,773,605 $ 412,166$ 2,185,771Funding Source(s):TRAFFIC SYSTM MGMT FUND - Fund 2001 $ 220,686 $ 40,000$ 260,686PROP 1B-LOCAL STREETS&RDS - Fund 2434 $ 966,874 $ 225,655$ 1,192,530STATE TRANSIT ASSISTANCE - Fund 2413 $ 20,185 $ 5,046$ 25,231STATE OF GOOD REPAIR - Fund 2417 $ 5,860 $ 1,465$ 7,325LOCAL TDA ARTICLE 8C - Fund 2414 $ 560,000 $ 140,000$ 700,000TOTAL $ 1,773,605 $ 412,166$ 2,185,771Public WorksLocation MapC0032Metrolink North Parking Lot ExpansionConvert vacant lot (approximately 150' wide x 120' long) west of Metrolink North Parking Lot into a formal parking lot, adding an estimated 35-40 parking stalls. The project also includes reconstructing the existing North Parking Lot (owned by VCTC).Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2001-430-C0032-55300 Capital - Professional Services2001-430-C0032-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2434-430-C0032-55200 Infrastructures2434-430-C0032-55300 Capital - Professional Services2413-430-C0032-55200 Infrastructures 2417-430-C0032-55200 Infrastructures2414-430-C0032-55200 Infrastructures Page 33 of 14437 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 13,414 $ 286$ 13,700$ 308,000$ 308,000$ 13,280 $ 133,021$ 146,301Project TOTAL $ 26,694 $ 441,307$ 468,001Funding Source(s):TRAFFIC SYSTM MGMT FUND - Fund 2001 $ 13,414 $ 286$ 13,700LOS ANGELES A.O.C. - Fund 2014 $ 13,280 $ 441,021$ 454,301 TOTAL $ 26,694 $ 441,307$ 468,001Public WorksLocation MapC0033Los Angeles Avenue UndergroundingUndergrounding the overhead utilities along the north side of Los Angeles Avenue, east and west of the Arroyo Simi bridge.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2001-311-C0033-55300 Capital - Professional Services2014-311-C0033-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2014-311-C0033-55300 Capital - Professional Services Page 34 of 14438 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:2.15Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 446,344$ 446,344$ 85,856 $ 4,144$ 90,000$ 656$ 656Project TOTAL $ 86,512 $ 450,488$ 537,000Funding Source(s):LOCAL TDA ARTICLE 8A - Fund 2412 $ 85,856 $ 450,488$ 536,344PROP 1B-LOCAL STREETS&RDS - Fund 2434 $ 656$ 656 TOTAL $ 86,512 $ 450,488$ 537,000Public WorksLocation MapC0035Arroyo Drive OverlayPavement rehabilitation on Arroyo Drive, from Collins Drive to entrance of Villa del Arroyo Mobile Home Park.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2412-311-C0035-55200 Infrastructures2412-311-C0035-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2434-311-C0035-55300 Capital - Professional Services Page 35 of 14439 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:2.15Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 200,000$ 200,000$ 45,000 $ 23,820$ 68,820$ 13,144$ 13,144$ 216,856$ 216,856$ 100,000 $ 431,180$ 531,180Project TOTAL $ 158,144 $ 871,856$ 1,030,000Funding Source(s):TRAFFIC SYSTM MGMT FUND - Fund 2001 $ 45,000 $ 223,820$ 268,820LOCAL TDA ARTICLE 3 - Fund 2411 $ 113,144 $ 648,036$ 761,180 TOTAL $ 158,144 $ 871,856$ 1,030,000Public WorksLocation MapC0037Arroyo Drive Bike/Ped ProjectPedestrian improvements along Arroyo Drive, between Collins Drive and Simi Valley city limit line. TDA Article 3 grant for FY 2015/16 and FY 2016/17 provides $200,000 for a sidewalk starting at west end of Villa Del Arroyo Mobile Home Park, eastward to the Simi Valley city limit line. $200,000 grant requires a 50% local match. FY 2018/19 includes new grant ($531,180) and local match of $68,820.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2001-311-C0037-55200 Infrastructures2001-311-C0037-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2411-311-C0037-55100 Land Acquisition2411-311-C0037-55200 Infrastructures2411-311-C0037-55300 Capital - Professional Services Page 36 of 14440 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:4.4Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 150,000$ 150,000Project TOTAL $ 150,000$ 150,000Funding Source(s):ENDOWMENT FUND - Fund 2018 $ 150,000$ 150,000 TOTAL$ 150,000$ 150,000Parks, Recreation & Community ServicesLocation MapC0042Arroyo Vista Recreation Center Facility ExpansionDevelop design plan for Arroyo Vista Recreation Center for improvements to the facility which include office expansion.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2018-171-C0042-55300 Capital - Professional Services Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 37 of 14441 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 20,000$ 20,000$ 60,000$ 60,000Project TOTAL$ 80,000$ 80,000Funding Source(s):COMMUNITY WIDE PARK DEVT - Fund 2010$ 80,000$ 80,000 TOTAL$ 80,000$ 80,000Parks, Recreation & Community ServicesLocation MapC0047AVCP Storage FacilityDesign and construction of a storage facility at Arroyo Vista Community Park.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2010-541-C0047-55300 Capital - Professional Services2010-541-C0047-55400 Construction BldgEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 38 of 14442 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:4.4Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 150,000$ 150,000$ 2,300,000$ 2,300,000Project TOTAL$ 2,450,000$ 2,450,000Funding Source(s):COMMUNITY WIDE PARK DEVT - Fund 2010$ 2,450,000$ 2,450,000 TOTAL$ 2,450,000$ 2,450,000Parks, Recreation & Community ServicesLocation MapC0048Arroyo Vista Recreation Center Gym Expansion ProjectProfessional Services fees to review the existing plans for the gym expansion and update them to current building codes. Construction costs estimated at $2,300,000.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2010-541-C0048-55300 Capital - Professional Services2010-541-C0048-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 39 of 14443 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 2,030,638($ 0)$ 2,030,638$ 21,912$ 21,912Project TOTAL$ 2,052,550($ 0)$ 2,052,550Funding Source(s):GENERAL FUND - Fund 1000$ 2,030,638($ 0)$ 2,030,638GAS TAX - Fund 2415$ 21,912$ 21,912 TOTAL$ 2,052,550($ 0)$ 2,052,550C0050Streetlight Acquisition and RetrofitPublic WorksAcquisition of Southern California Edison Streetlight System and retrofit to LED. Project is a joint effort between PRCS and Public Works.PROJECT COMPLETED IN FY 21/22.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount 1000-312-C0050-55200 Infrastructures2415-312-C0050-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Location MapVarious Locations Citywide Page 40 of 14444 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:3.13Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 2,250 $ 197,750$ 200,000Project TOTAL $ 2,250 $ 197,750$ 200,000Funding Source(s):ART IN PUBLIC PLACES - Fund 2007 $ 2,250 $ 197,750$ 200,000 TOTAL $ 2,250 $ 197,750$ 200,000Parks, Recreation & Community ServicesLocation MapC0052North Train Station Public ArtPublic art project to be constructed at the north Metrolink Train Station.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2007-511-C0052-55500 Improvements Other Than Bldgs Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 41 of 14445 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 250,000$ 250,000$ 45,000$ 45,000Project TOTAL$ 295,000$ 295,000Funding Source(s):COUNTRY CLUB ESTATES - Fund 2315$ 295,000$ 295,000 TOTAL$ 295,000$ 295,000Parks, Recreation & Community ServicesLocation MapC0053Championship Drive Sidewalk and Trail ImprovementsChampionship Drive trail and drainage improvements.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2315-542-C0053-55200 Infrastructures2315-542-C0053-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 42 of 14446 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:3.11Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 1,835,739 $ 51,060 $ 2,000,000$ 3,886,798$ 18,000,000$ 18,000,000Project TOTAL$ 1,835,739 $ 51,060 $ 2,000,000 $ 18,000,000$ 21,886,798Funding Source(s):CITY HALL IMPROVEMENT FUND - Fund 3001$ 1,835,739 $ 51,060$ 2,000,000 $ 18,000,000$ 21,886,798 TOTAL$ 1,835,739 $ 51,060 $ 2,000,000 $ 18,000,000$ 21,886,798Parks, Recreation & Community ServicesLocation MapC0056New Moorpark City LibraryDesign and construction of a new City Library. $1,835,739 - Architectural Services$2,000,000 - Construction management and special materials testing for the project$18,000,000 - Construction of building and furnitures, fixtures & equipmmentBudget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3001-171-C0056-55300 Capital - Professional Services3001-171-C0056-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 43 of 14447 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 EstimateProject TOTALFunding Source(s):LOS ANGELES A.O.C. - Fund 2014 TOTALPublic WorksLocation MapC0060Traffic Signal Improvements at Spring Rd (Charles & Second)The Spring Road railroad crossing improvements completed thus far have reduced congestion and delays; however, the work is not completely coordinated with Spring Road signals at Charles Street and Second Street. The road segment between Charles Street and Second Street will be evaluated for future improvements, including signal coordination, timing/phasing adjustments, and signal/striping/signage changes. Once the engineering analysis and design is complete, improvement work will be completed and evaluated.FY 2022/23 Budget proposes to defund $100,000 in LA AOC from Infrastructure and $25,000 from Professional Services. Disencumbering the funds will return the funds to LA AOC for other expenditures. Project is considered complete.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount 2014-311-C0060-55200 Infrastructures2014-311-C0060-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 44 of 14448 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:4.5Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 120,000$ 120,000$ 850,000$ 850,000Project TOTAL$ 120,000$ 850,000$ 970,000Funding Source(s):ENDOWMENT FUND - Fund 2018$ 120,000$ 120,000TBD - Fund TBD $ 850,000$ 850,000 TOTAL$ 120,000$ 850,000$ 970,000Parks, Recreation & Community ServicesLocation MapC0061Arroyo Simi Trail PlanConduct an Arroyo Simi Trail feasibility study and develop a phasing plan for trail improvements along the Arroyo Simi from the west City limits to east City limits at Arroyo Drive.Estimated future improvement costs to cover construction of the initial phase between the Arroyo Vista Recreation Center pedestrian bridge and Spring Road, including an undercrossing under the Spring Road bridge.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2018-542-C0061-55300 Capital - Professional ServicesTBD -55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 45 of 14449 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 52,981$ 52,981Project TOTAL $ 52,981$ 52,981Funding Source(s):ENDOWMENT FUND - Fund 2018 $ 52,981$ 52,981 TOTAL $ 52,981$ 52,981Parks, Recreation & Community ServicesLocation MapC006280 Acre Parcel Trail ProjectIn conjunction with the Moorpark Watershed Parks, Recreation and Conservation Authority (MWPRCA), develop a multi-use recreational trail in the 80-acre parcel. Costs represent City contributed match funding. MWPRCA is seeking grant funding for the remainder of the project cost of $501,600.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2018-173-C0062-55300 Capital - Professional Services Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 46 of 14450 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:2.12Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 106,470 $ 30$ 106,500$ 28,720 $ 780$ 29,500$ 1,314,000$ 1,314,000$ 300,000 $ 150,000$ 450,000Project TOTAL $ 135,190 $ 1,614,810 $ 150,000$ 1,900,000Funding Source(s):GENERAL FUND - Fund 1000 $ 106,470 $ 30$ 106,500COMMUNITY WIDE PARK DEVT - Fund 2010 $ 28,720 $ 1,314,780$ 1,343,500ART IN PUBLIC PLACES - Fund 2007 $ 300,000 $ 150,000$ 450,000 TOTAL $ 135,190 $ 1,614,810 $ 150,000$ 1,900,000Parks, Recreation & Community ServicesLocation MapC0063Inclusive Playground at Tierra Rejada ParkDesign and install inclusive playground at Tierra Rejada Park. City has been awarded Land and Water Conservation Fund (LWCF) grant funds and Per Capita Grant Funds to offset 50% of the improvement costs. Grants are reimbursement grants payable upon project completion so full project costs have been appropriated. Grant revenue to be credited to Fund 2010 and recognized upon project completion. Staff anticipates project starting in Fall 2022 and completion in Summer 2023.LWCF Grant Funds $775,500Per Capita Grant Funds $200,578Estimated Net Cost to City: $924,000 Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount1000-541-C0063-55300 Capital - Professional Services2010-541-C0063-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2010-541-C0063-55500 Improvements Other Than Bldgs2007-541-C0063-55500 Improvements Other Than Bldgs Page 47 of 14451 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 125,000$ 125,000$ 90,000$ 90,000Project TOTAL$ 215,000$ 215,000Funding Source(s):EQUIPMENT REPLACEMENT FUND - Fund 3003$ 125,000$ 125,000PARK IMPROVEMENT ZONE 2017-1 - Fund 2011$ 90,000$ 90,000 TOTAL$ 215,000$ 215,000Parks, Recreation & Community ServicesLocation MapC0064Replace Play Equipment at Community Center ParkReplace children's play structures and equipment at Community Center Park. Replace sand with engineered wood fiber and construct ADA parking lot improvements.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3003-541-C0064-55000 Machine & Equipments2011-541-C0064-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 48 of 14452 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 106,275$ 106,275$ 25,000$ 25,000$ 25,000$ 25,000Project TOTAL$ 156,275$ 156,275Funding Source(s):GENERAL FUND - Fund 1000$ 106,275$ 106,275ART IN PUBLIC PLACES - Fund 2007$ 25,000$ 25,000ENDOWMENT FUND - Fund 2018$ 25,000$ 25,000TOTAL$ 156,275$ 156,275Parks, Recreation & Community ServicesLocation MapC0065City Entry Monument SignageInstall four City welcome monument signs, including solar-powered LED illumination, at locations on Tierra Rejada Road, Grimes Canyon Road, and Princeton Avenue. Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount1000-542-C0065-55500 Improvements Other Than Bldgs2007-542-C0065-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T2018-542-C0065-55500 Improvements Other Than BldgsPage 49 of 14453 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 330,000$ 330,000$ 130,000$ 130,000Project TOTAL$ 460,000$ 460,000Funding Source(s):PARK IMPROVEMENT ZONE 2017-1 - Fund 2011$ 330,000$ 330,000EQUIPMENT REPLACEMENT FUND - Fund 3003$ 130,000$ 130,000TOTAL$ 460,000$ 460,000Parks, Recreation & Community ServicesLocation MapC0066Campus Park Playground UpgradesReplace children's play structures and equipment at Campus Park, and replace sand with engineered wood fiber. Install separate sand play area. Replace restroom with pre-fabricated restroom facility.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2011-541-C0066-55500 Improvements Other Than Bldgs3003-541-C0066-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 50 of 14454 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 120,000$ 120,000$ 130,000$ 130,000Project TOTAL$ 250,000$ 250,000Funding Source(s):PARK IMPROVEMENT ZONE 2017-2 - Fund 2013$ 120,000$ 120,000EQUIPMENT REPLACEMENT FUND - Fund 3003$ 130,000$ 130,000TOTAL$ 250,000$ 250,000Parks, Recreation & Community ServicesLocation MapC0067Replace Play Equipment at Glenwood ParkReplace children's play structures and equipment for ages 5-12 at Glenwood Park, and replace sand with engineered wood fiber. ADA sidewalk improvements. Install sand play area.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2013-541-C0067-55500 Improvements Other Than Bldgs3003-541-C0067-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 51 of 14455 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 251,275$ 251,275Project TOTAL$ 251,275$ 251,275Funding Source(s):GENERAL FUND - Fund 1000$ 251,275$ 251,275TOTAL$ 251,275$ 251,275Parks, Recreation & Community ServicesLocation MapC0068High Street Arts Center Roofing ReplacementDemo, repair, and replace roofing material at the High Street Arts Center including roof drains and galvanized flashing.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount1000-171-C0068-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 52 of 14456 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:3.12Project Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 301,730$ 301,730$ 6,965,936 $ 169,548$ 7,135,484Project TOTAL$ 7,267,666 $ 169,548$ 7,437,214Funding Source(s):GENERAL FUND - Fund 1000$ 301,730$ 301,730CITY HALL IMPROVEMENT FUND - Fund 3001$ 6,965,936 $ 169,548$ 7,135,484TOTAL$ 7,267,666 $ 169,548$ 7,437,2141000-120-C0070-55300 Capital - Professional Services3001-120-C0070-55210 Bldg & Struct AcqEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TTemporary City Hall facilities at 323 Science Drive.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountParks, Recreation & Community ServicesLocation MapC0070City Hall at 323 Science DrivePage 53 of 14457 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 65,000$ 65,000$ 1,935,000$ 1,935,000Project TOTAL$ 65,000$ 1,935,000$ 2,000,000Funding Source(s):SPECIAL PROJECTS - Fund 3004$ 65,000$ 1,935,000$ 2,000,000TOTAL$ 65,000$ 1,935,000$ 2,000,000Parks, Recreation & Community ServicesLocation MapC0071Lease SCE Property Adjacent to AVCPLease SCE property adjacent to Arroyo Vista Community Park. Estimated improvement costs of $1,935,000 to cover parking lot expansion, grading and site improvements, ball fields, landscaping and irrigation.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3004-541-C0071-55300 Capital - Professional Services3004-541-C0071-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 54 of 14458 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 50,000$ 50,000Project TOTAL$ 50,000$ 50,000Funding Source(s):COMMUNITY WIDE PARK DEVT - Fund 2010 $ 50,000$ 50,000TOTAL$ 50,000$ 50,0002010-541-C0072-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TInstall additional 20-foot high softball fencing at Mountain Meadows Park.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountParks, Recreation & Community ServicesLocation MapC0072Additional Softball Fencing at Mountain Meadows ParkPage 55 of 14459 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/A Various Locations CitywideProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 38,702 $ 61,299 $ 125,000$ 225,000Project TOTAL $ 38,702 $ 61,299 $ 125,000$ 225,000Funding Source(s):GENERAL FUND - Fund 1000 $ 38,702 $ 61,299 $ 125,000$ 225,000 TOTAL $ 38,702 $ 61,299 $ 125,000$ 225,000Parks, Recreation & Community ServicesLocation MapM0002ADA ImprovementsBus Stop improvements: $85,000Facilities and Parks improvements: $5,225,000Intersections: $1,378,000Curbs and sidewalks: $17,212,000Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount1000-171-M0002-55500 Improvements Other Than Bldgs Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 56 of 14460 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 62,618 $ 382$ 63,000$ 40,250 $ 54,750$ 95,000$ 353,050$ 353,050Project TOTAL $ 455,918 $ 55,132$ 511,050Funding Source(s):ENDOWMENT FUND - Fund 2018 $ 102,868 $ 55,132$ 158,000EQUIPMENT REPLACEMENT FUND - Fund 3003 $ 353,050$ 353,050 TOTAL $ 455,918 $ 55,132$ 511,050Parks, Recreation & Community ServicesLocation MapM0024Arroyo Vista Recreation Center HVAC ReplacementRemove and replace the four HVAC units at Arroyo Vista Recreation Center, 10 ton unit ($15,000), 12.5 ton unit ($20,000), 15 ton unit ($30,000), and 25 ton unit ($35,000); total $100,000. $40,000 for design of the system and replacing gas line to Arroyo Vista Recreation Center gym and $95,000 for gas line construction.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2018-171-M0024-55300 Capital - Professional Services2018-171-M0024-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T3003-171-M0024-55500 Improvements Other Than Bldgs Page 57 of 14461 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 50,000$ 50,000$ 250,000$ 250,000Project TOTAL$ 300,000$ 300,000Funding Source(s):ENDOWMENT FUND - Fund 2018$ 300,000$ 300,000 TOTAL$ 300,000$ 300,000Parks, Recreation & Community ServicesLocation MapM0025Arroyo Vista Recreation Center RemodelKitchen: Upgrade cabinets, replace new sink to comply with Health and Safety Code, replace appliances and interior painting Building: Exterior Masonary Waterproofing, replace windows Rooms: Replace flooring, add drop down ceiling, paintBudget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2018-171-M0025-55300 Capital - Professional Services2018-171-M0025-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 58 of 14462 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 50,000$ 50,000Project TOTAL$ 50,000$ 50,000Funding Source(s):LOCAL TDA ARTICLE 8A - Fund 2412 $ 50,000$ 50,000TOTAL$ 50,000$ 50,000Public WorksLocation MapM0029Sidewalk Reconstruction ProjectReplacement of sidewalks, curbs, and gutters at various locations. Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2412-311-M0029-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 59 of 14463 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 65,468 $ 73,222$ 138,690Project TOTAL $ 65,468 $ 73,222$ 138,690Funding Source(s):LOCAL TDA ARTICLE 8A - Fund 2412 $ 65,468 $ 73,222$ 138,690 TOTAL $ 65,468 $ 73,222$ 138,690Public WorksLocation MapM0033Traffic Signal Cabinet UpgradesRevised project scope of work:1) Replace signal controller and battery backup units on Tierra Rejada Road ($140,875), Spring Road ($40,250), and Miller Parkway ($40,250);2) Replace signal cabinets and battery backup units on Campus Park ($25,875), Princeton ($25,875);3) Replace safety lights from halogen to LED ($95,318).Total project cost estimate of $368,443 is proposed to be spent over the course of several fiscal years.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount 2412-311-M0033-55200 Infrastructures Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 60 of 14464 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 935,650$ 935,650$ 14,345 $ 5$ 14,350Project TOTAL$ 14,345 $ 935,655$ 950,000Funding Source(s):LOS ANGELES A.O.C. - Fund 2014$ 14,345 $ 935,655$ 950,000 TOTAL$ 14,345 $ 935,655$ 950,000Public WorksLocation MapM0040LA Ave Traffic Signals/Fiber Optic UpgradeReplace copper lines with fiber optic technology. New timing/coordination improvements for traffic signals along Los Angeles Avenue.2014-311-M0040-55200 Infrastructures2014-311-M0040-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TBudget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount Page 61 of 14465 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 70,000 $ 30,000$ 100,000$ 274,276$ 274,276$ 74,624$ 74,624Project TOTAL $ 344,276 $ 104,624$ 448,900Funding Source(s):GENERAL FUND - Fund 1000 $ 344,276 $ 104,624$ 448,900 TOTAL$ 344,276 $ 104,624$ 448,900Parks, Recreation & Community ServicesLocation MapM0044Park and Facility Pavement RehabilitationVarious Park Locations CitywideParking lot rehabilitation at Mountain Meadows Park, Tierra Rejada Park, Peach Hill Park, Mammoth Highlands Park, Arroyo Vista Community Park, Moorpark Public Service Facility, and Ruben Castro Human Services Center.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount1000-541-M0044-55300 Capital - Professional Services1000-541-M0044-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T1000-171-M0044-55500 Improvements Other Than Bldgs Page 62 of 14466 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 85,000$ 85,000$ 1,000,000$ 1,000,000Project TOTAL$ 85,000 $ 1,000,000$ 1,085,000Funding Source(s):TREE AND LANDSCAPE FEES - Fund 2006$ 85,000$ 85,000SPECIAL PROJECTS - Fund 3004$ 1,000,000$ 1,000,000TOTAL$ 85,000 $ 1,000,000$ 1,085,000Parks, Recreation & Community ServicesLocation MapM0045Princeton Avenue/Campus Park Drive Landscape RenovationDesign and renovation of medians and parkways on Princeton Avenue from Condor Drive along Campus Park Drive to Marquette Street. Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2006-542-M0045-55300 Capital - Professional Services3004-542-M0045-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 63 of 14467 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 45,000$ 45,000$ 500,000$ 500,000Project TOTAL$ 45,000 $ 500,000$ 545,000Funding Source(s):TREE AND LANDSCAPE FEES - Fund 2006$ 45,000$ 45,000SPECIAL PROJECTS - Fund 3004$ 500,000$ 500,000 TOTAL$ 45,000 $ 500,000$ 545,000Parks, Recreation & Community ServicesLocation MapM0046Los Angeles Avenue Landscape RenovationRenovate the landscaped parkways and enhance the wall treatments on the north side of Los Angeles Avenue from Spring Road to Millard Street. Wall enhancements will include removal and replacement of the existing vine, stone pilasters, and stucco finish.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2006-542-M0046-55300 Capital - Professional Services3004-542-M0046-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 64 of 14468 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 263,324$ 263,324Project TOTAL $ 263,324$ 263,324Funding Source(s):REMAINING BOND PROCEEDS - Fund 3005 $ 263,324$ 263,324 TOTAL $ 263,324$ 263,324 3005-311-M0050-55200 Infrastructures Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TSidewalk rehabilitation within the boundariesof the Redevelopment Area. The scope of work and improvements include sidewalk repair, sidewalk replacement, curb cuts, access ramps, and street transitions. Specific locations will be presented to City Council for approval.PROJECT COMPLETED IN FY 2021/22Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountPublic WorksLocation MapM0050Sidewalk RehabilitationPage 65 of 14469 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 43,862$ 43,862Project TOTAL $ 43,862$ 43,862Funding Source(s):MOORPARK HIGHLANDS - Fund 2322 $ 43,862$ 43,862 TOTAL $ 43,862$ 43,862Parks, Recreation & Community ServicesLocation MapM0052Moorpark Highlands Slope NaturalizationNaturalization of slope areas in LMD 22 (Moorpark Highlands) with low-maintenance, self-sustaining native and drought tolerant landscaping.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2322-542-M0052-55300 Capital - Professional Services Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 66 of 14470 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 100,000$ 100,000Project TOTAL$ 100,000$ 100,000Funding Source(s):COMMUNITY WIDE PARK DEVT - Fund 2010 $ 100,000$ 100,000 TOTAL$ 100,000$ 100,000Parks, Recreation & Community ServicesLocation MapM0053Replace Skate Park Fencing at Poindexter ParkReplace damaged chain link fence around the skatepark with a stronger “no-climb” alternative. Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2010-541-M0053-55500 Improvements Other Than Bldgs Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S T Page 67 of 14471 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 25,850 $ 31,768$ 57,618Project TOTAL $ 25,850 $ 31,768$ 57,618Funding Source(s):LOCAL TDA ARTICLE 8C - Fund 2414 $ 25,850 $ 31,768$ 57,618 TOTAL $ 25,850 $ 31,768$ 57,618Public WorksLocation MapP0011Bus Shelters and Other Bus Stop AmenitiesBus stop adjustments, refurbishments, additions, and amenities.FY 2021/22 budget reduced by $35,000 to reflect transferring federal grant from this project to routine bus maintenance (de-federalizes the CIP).2414-430-P0011-55500 Improvements Other Than Bldgs Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TBudget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount Page 68 of 14472 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 55,538$ 55,538Project TOTAL $ 55,538$ 55,538Funding Source(s):TRAFFIC SYSTM MGMT FUND - Fund 2001 $ 55,538$ 55,538 TOTAL $ 55,538$ 55,538 2001-541-R0030-55500 Improvements Other Than Bldgs Estimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TInstall electric vehicle chargers in Lot B at Arroyo Vista Community Park.City awarded Ventura County Air Pollution Control District grant funds in the amount of $22,904 to offset project costs. Grant funds will be reimbursed upon project completion so full project costs have been appropriated. Grant revenue to be credited to Fund 2001 and recognized upon project completion. Anticipated completion Spring 2022.Total Project Costs: $55,538VCAPCD Grant Funds: $22,904Estimated Net Cost to City: $32,634 Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountParks, Recreation & Community ServicesLocation MapR0030AVCP Electric Vehicle ChargersPage 69 of 14473 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 1,000,000$ 1,000,000Project TOTAL$ 1,000,000$ 1,000,000Funding Source(s):TBD - Fund TBD$ 1,000,000$ 1,000,000TOTAL$ 1,000,000$ 1,000,000TBD-55200 InfrastructuresEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TRailroad crossing improvements at Arroyo Drive.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountPublic WorksLocation MapXXXXXArroyo Drive Railroad Crossing ImprovementsPage 70 of 14474 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 150,000$ 150,000Project TOTAL$ 150,000$ 150,000Funding Source(s):TBD - Fund TBD$ 150,000$ 150,000TOTAL$ 150,000$ 150,000TBD-55300 Capital - Professional ServicesEstimated TOTALProject CostThis project is to prepare an update to the 1995 Citywide Master Plan of Drainage. This project will be undertaken upon completion of the Letter of Map Revisions to the Digital Flood Insurance Rate Maps.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountA D D I T I O N A L F U N D I N G R E Q U E S TPublic WorksLocation MapXXXXXDrainage Masterplan UpdatePage 71 of 14475 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTS FISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 800,000$ 800,000Project TOTAL$ 800,000 $ 800,000Funding Source(s):TBD - Fund TBD$ 800,000$ 800,000TOTAL$ 800,000 $ 800,000TBD-55300 Capital - Professional ServicesEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TConstruction of storm drainage infrastructure improvements to serve the residential area north of the intersection of Los Angeles Avenue and Shasta Avenue, as identified in the City's Master Plan of Drainage (G-1 Shasta Drain). No funding source has been identified for this project. The 1995 cost estimate for this project is $188,000. However, the full scope and cost of this project has not been determined.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountPublic WorksLocation MapXXXXXShasta DrainPage 72 of 14476 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 65,000$ 65,000$ 600,000$ 600,000Project TOTAL$ 665,000$ 665,000Funding Source(s):COMMUNITY WIDE PARK DEVT - Fund 2010$ 665,000$ 665,000TOTAL$ 665,000$ 665,000Parks, Recreation & Community ServicesLocation MapXXXXXAVCP Water Spray AttractionDesign and install a water spray attraction at Arroyo Vista Community Park.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2010-541-XXXXX-55300 Capital - Professional Services2010-541-XXXXX-55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 73 of 14477 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 175,000$ 175,000Project TOTAL$ 175,000$ 175,000Funding Source(s):EQUIPMENT REPLACEMENT FUND - Fund 3003$ 175,000$ 175,000TOTAL$ 175,000$ 175,000Parks, Recreation & Community ServicesLocation MapXXXXXReplace Play Equipment at Magnolia ParkReplace children's play structures and equipment at Magnolia Park, and replace sand with engineered wood fiber.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3003-541-XXXXX-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 74 of 14478 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 225,000$ 225,000Project TOTAL$ 225,000$ 225,000Funding Source(s):EQUIPMENT REPLACEMENT FUND - Fund 3003$ 225,000$ 225,000TOTAL$ 225,000$ 225,000Parks, Recreation & Community ServicesLocation MapXXXXXReplace Play Equipment at Mountain Meadows ParkReplace children's play structures and equipment at Mountain Meadows Park, and replace sand with engineered wood fiber.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3003-541-XXXXX-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 75 of 14479 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 135,000$ 135,000Project TOTAL$ 135,000 $ 135,000Funding Source(s):EQUIPMENT REPLACEMENT FUND - Fund 3003$ 135,000$ 135,000TOTAL$ 135,000 $ 135,000Parks, Recreation & Community ServicesLocation MapXXXXXReplace Play Equipment at Peach Hill ParkReplace children's play structures and equipment at Peach Hill Park.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3003-541-XXXXX-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 76 of 14480 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 100,000$ 100,000$ 300,000$ 300,000Project TOTAL$ 400,000$ 400,000Funding Source(s):PARK IMPROVEMENT ZONE 2017-2 - Fund 2013$ 100,000$ 100,000EQUIPMENT REPLACEMENT FUND - Fund 3003$ 300,000$ 300,000TOTAL$ 400,000$ 400,0002013-541-XXXXX-55500 Improvements Other Than Bldgs3003-541-XXXXX-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TReplace children's play structures and equipment at Tierra Rejada Park, and replace sand with engineered wood fiber. Install sand play area.Note: This project would be implemented if grant funding for the inclusive playground at Tierra Rejada Park project is not awarded and the project does not move forward.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountParks, Recreation & Community ServicesLocation MapXXXXXReplace Play Equipment at Tierra Rejada ParkPage 77 of 14481 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 250,000$ 250,000Project TOTAL$ 250,000 $ 250,000Funding Source(s):EQUIPMENT REPLACEMENT FUND - Fund 3003$ 250,000$ 250,000TOTAL$ 250,000 $ 250,000Parks, Recreation & Community ServicesLocation MapXXXXXReplace Play Equipment at Villa Campesina ParkReplace children's play structures and equipment at Villa Campesina Park, and replace sand with engineered wood fiber.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount3003-541-XXXXX-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 78 of 14482 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/AProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 50,000$ 50,000$ 150,000$ 150,000Project TOTAL$ 200,000$ 200,000Funding Source(s):PARK IMPROVEMENT ZONE 2017-1 - Fund 2011$ 50,000$ 50,000EQUIPMENT REPLACEMENT FUND - Fund 3003$ 150,000$ 150,000TOTAL$ 200,000$ 200,000Parks, Recreation & Community ServicesLocation MapXXXXXReplace Play Equipment at Virginia Colony ParkReplace children's play structures and equipment at Virginia Colony Park, and replace sand with engineered wood fiber. Install separate sand play area.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover Amount2011-541-XXXXX-55500 Improvements Other Than Bldgs3003-541-XXXXX-55000 Machine & EquipmentsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 79 of 14483 CITY of MOORPARKCAPITAL IMPROVEMENT PROJECTSFISCAL YEARS 2022/23 thru 2026/27Project Number:Council Goals and Objectives:N/A Location To Be DeterminedProject Title:Department:Project Description:2022/23 Appropriation2023/24 Estimate2024/25 Estimate2025/26 Estimate2026/27 Estimate$ 25,000$ 25,000$ 125,000$ 125,000Project TOTAL$ 150,000$ 150,000Funding Source(s):TBD - Fund TBD $ 150,000$ 150,000TOTAL$ 150,000$ 150,000Parks, Recreation & Community ServicesLocation MapXXXXXDisc Golf CourseDetermine an appropriate location for and install a disc golf course, including walkways and amenities.Budget UnitAccount DescriptionTotal Expenditures ESTIMATEDas of 6/30/20222021/22 Estimated Carryover AmountTBD -55300 Capital - Professional ServicesTBD -55500 Improvements Other Than BldgsEstimated TOTALProject CostA D D I T I O N A L F U N D I N G R E Q U E S TPage 80 of 14484 Fiscal Year 2022/23 Congestion Management Program Page 81 of 144 85 Congestion Management Program The purpose of the Ventura County Transportation Commission’s (VCTC) Congestion Management Program (CMP) is to monitor certain street segments and/or intersections on the CMP Road Network (see Map), to confirm that the Level of Service (LOS) [a measurement of the level of congestion] on those segments, or at those intersections, does not deteriorate below certain stipulated levels. Increased traffic generated by development is one of the major causes of increased traffic congestion and, therefore, the deterioration of the LOS. The CMP requires each Agency to identify projects designed to increase capacity and/or otherwise improve the efficient and effective movement of traffic. The projects set forth in this program, which are on the CMP Road Network and which could reduce congestion, are listed on the following pages.   Page 82 of 144 86 Congestion Management Program Network Page 83 of 144 87 Congestion Management Program: Fiscal Year 2022/23 to 2026/27 Project Name Account Prior Years FY 21/22*FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total Streets (100) Moorpark Ave Widening Project C0004 $2,343,217 $0 $101,648 $370,755 $0 $0 $0 $2,815,620 Los Angeles Avenue Widening - Spring Road to Moorpark C0021 $2,474,956 $803,000 $1,722,725 $0 $0 $0 $0 $5,000,681 23 Freeway North Alignment C0025 $192,325 $0 $0 $0 $0 $0 $0 $192,325 Los Angeles Avenue Widening at Shasta Avenue (COMPLETE)C0030 $1,678,147 $0 $10,000 $0 $0 $0 $0 $1,688,147 Los Angeles Avenue Traffic Signal/Fiber Optic Upgrade M0040 $14,345 $0 $935,655 $0 $0 $0 $0 $950,000 Los Angeles Avenue Widening west of Tierra Rejada Road $0 $0 $0 $0 $0 $0 $0 $0 Total $6,702,990 $803,000 $2,770,028 $370,755 $0 $0 $0 $10,646,773 Traffic Signals (300) Los Angeles Avenue and Shasta Aveune $0 $0 $0 $0 $0 $0 $0 $0 Los Angeles Avenue and Millard Street $0 $0 $0 $0 $0 $0 $0 $0 Los Angeles Avenue West of Butter Creek Road $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 Grand Total $10,646,773 * Fiscal Year 2021/22 Carryover Amount Page 84 of 144 88 Fiscal Year 2022/23 Public Works Potential Projects Page 85 of 144 89 Public Works Potential Projects # Numbering is added for reference only, and does not indicate or suggest project priority, preference, or order of consideration. Public Works Streets 1 Evaluate options for Bus turn-outs on Los Angeles Avenue (SR118). 2 Modernize bus shelters. 3 Modify the intersection of Condor Drive (south), Princeton Avenue, and Virginia Colony Place. 4 Widen Science Drive at Los Angeles Avenue (SR-118) to provide a dedicated right turn lane. 5 Widen north side of Unidos Avenue. 6 Update the pavement management system. 7 Evaluate feasibility of relocating the Metrolink layover facility and work with VCTC and SCRRA to construct a screen wall on north and east sides of Metrolink layover facility. 8 Evaluate construction of Lassen Avenue from Park Lane to Moorpark Avenue to create a four-way intersection at Third Street. 9 Evaluate cost benefit for potential use of cold in place recycling of asphalt concrete (AC) and warm mix AC for streets and parking lots, and permeable surfaces for parking lots and bike paths. 10 Evaluate feasibility of widening the eastside of Princeton Avenue to provide a dedicated right-turn lane from the Condor Drive traffic signal to the eastbound SR-118 on ramp. 11 Reduce the pavement width and add landscaping on Park Crest Lane, Moorpark Avenue south of SR-118, Ridgecrest Drive, and Elk Run Loop. 12 Evaluate benefits of revising current street standards to narrow the street width but not the right-of-way to encourage more landscaping and reduce future pavement maintenance costs. 13 Evaluate feasibility of adding second southbound travel lane on Collins Drive from University Drive traffic signal to Benwood Road and a dedicated right turn lane onto Campus Park Drive. Page 86 of 144 90 14 Evaluate feasibility of adding a second on-ramp lane from southbound Collins Drive to the westbound SR-118. 15 Construct dedicated right and left-turn lanes for westbound Second Street at Moorpark Avenue (SR-23). 16 Construct dedicated right and shared left/through lanes for westbound Charles Street at Moorpark Avenue (SR-23). 17 Consider name change for Spring Road from Tierra Rejada Road to Walnut Canyon Road. 18 Construct a permanent truck scale facility west of the City limits. 19 Work with Caltrans to permit installation of City identification sign on Collins Drive overpass bridge and City entry statements in Caltrans right-of-way at selected locations. 20 Ensure City Ventures Project makes improvements on Wicks Road. 21 Widen, realignment, and reconstruction of High Street, west of Moorpark Avenue (“High Street West”). Public Works Trails and Walkways 1 Evaluate feasibility of pedestrian bridge over Poindexter Avenue and Union Pacific Railroad (UPRR) from Specific Plan No. 1. 2 Evaluate feasibility of pedestrian bridge on Los Angeles Avenue (SR-118) in vicinity of Moorpark Avenue (Goal 2/5+ years). 3 Evaluate feasibility of constructing a sidewalk on Arroyo Drive from Collins Drive to east City limits, and in conjunction with City of Simi Valley and County of Ventura, investigate pedestrian and bike connections between Collins Drive and Madera Road. Evaluate feasibility of planting drought tolerant landscaping on north side of Arroyo Drive between rail crossing and City boundary. (Project is currently in progress, C0037, with the exception of the drought tolerant landscaping concept). 4 Construct sidewalks on one side of certain streets in industrial zoned areas to provide a safe path for pedestrians and to encourage walking. 5 Install Lassen pathway lighting. Page 87 of 144 91 6 Evaluate options for providing a continuous Class 1 bike lane on Campus Park Drive, including a reduction of the number of travel lanes and attendant increase in landscaping and use of Caltrans/SCE right-of-way between Princeton Avenue and Collins Drive. 7 Evaluate potential uses for APN 513-0-010-225 (formerly referred to as Crawford Canyon) on north side of Princeton Avenue including possible trail connection to Moorpark Highlands. 8 Carry out regular bridge inspections and develop plan for rehabilitation of the Tierra Rejada Road, Spring Road, and Arroyo Simi Pedestrian bridges. Public Works Traffic Signals 1 Evaluate need for a traffic signal at Princeton Avenue and Nogales Street. 2 Evaluate need for a traffic signal at Campus Canyon Drive and Collins Drive. 3 Evaluate need to modify the Princeton Avenue and Condor Drive traffic signal to provide a protected/permissive left turn movement from southbound Princeton Avenue to eastbound Condor Drive. 4 Evaluate need for radar speed display sign on eastbound Tierra Rejada Road between Peach Hill Road and Southhampton Road. 5 Evaluate need to modify the Spring Road and Princeton Avenue traffic signal to provide a protected left turn movement from westbound Princeton Avenue to southbound Spring Road. 6 Evaluate feasibility and cost for modifying traffic signal pedestrian crossing devices for use by vision impaired and physically disabled persons as well as upgrading to include time display/countdown timers. 7 Evaluate feasibility and cost of installation of “Blue Lights” (also known as “Tattletale Lights”) on selected traffic signals to enhance traffic enforcement of red light violations. 8 Install protected/permissive left-turn at various intersections. 9 Prepare a Traffic Study for the Los Angeles Avenue (SR 118) corridor to determine ultimate locations of traffic signals and other improvements to optimize traffic flow and minimize impacts on adjacent residential streets. 10 Coordinate with Caltrans to improve traffic signal synchronization for Princeton Avenue/SR-118 ramps and Condor Drive. Page 88 of 144 92 11 Evaluate the development of a policy for installation of traffic calming devices, including speed humps. 12 Evaluate and develop plan to update traffic signal equipment and software programming. 13 Develop new design for City street name signs and a standard design for street identification signs in medians. 14 Develop formal traffic policies. 15 Accomplish a walkway study in vicinity of Collins Drive. 16 Modify signals on High Street, Princeton Avenue and Spring Road. 17 Design and install crosswalks with flashing lights at various locations, including: Princeton/Campus Park; Third/Moorpark; Charles/Moorpark; and High/Bard. Public Works Medians and Parkways 1 Install landscaping on the north side of Poindexter Avenue along railroad tracks. 2 Install landscaping on the south east corner of Tierra Rejada Road and Moorpark Road. 3 Install landscaping in excess right-of-way on southeast corner of Tierra Rejada Road and Moorpark Road and install standard curb and gutter. 4 Install monument sign at southwest corner of High Street and Moorpark Avenue for post office and public parking. 5 Install parkway trees on the west side of Spring Road north of Peach Hill Road. 6 Install raised median landscaping on Princeton Avenue from Spring Road to approximately 1,500 feet east of Spring Road. 7 Install missing sidewalk and plant parkway trees and landscaping on both sides of Princeton Avenue, from Spring Road to approximately 1,500 ft. east. 8 Install sidewalk and parkway landscaping on south side of Princeton Avenue west of Sharma. Page 89 of 144 93 9 Install parkway landscaping and enhanced pavement on collector and arterial streets that lack such improvements, including the south side of Peach Hill Road west of Rolling Knoll Road and north side of Peach Hill Road west of Bella Vista Drive and consider possible use of Xeriscape landscaping. 10 Install enhanced entry statements at Spring Road and Roberts Street, and Spring Road and Second Street. 11 Install raised landscaped median on Collins Drive from Campus Park Drive to University Drive. 12 Evaluate feasibility and interest from property owners for a possible property- owner funded sound wall on south side of Los Angeles Avenue (SR 118) between the City Limits and Butter Creek Road as well as between Butter Creek Road and Maureen Lane. 13 Evaluate feasibility of modifying certain existing streets to increase landscaping and reduce the amount of asphalt to be maintained. 14 Obtain ownership of sidewalks on the collector streets in the Mountain Meadows area from various HOAs. 15 Evaluate obtaining license agreement from private property owners to allow installing and maintaining drought tolerant landscaping on privately owned slopes on west side of Spring Road north of Monte Vista Nature Park (Tract 3096) and between the Arroyo Simi and Tract 4037. 16 Evaluate feasibility of installing raised median on Poindexter Avenue and on Gabbert Road south of Poindexter Avenue. 17 Improve freeway landscaping on Princeton Avenue. 18 Improve Roberts Avenue and Second Street parkways from Spring Road to Harry Street. 19 Develop design plan to refurbish median landscaping and hardscape on Tierra Rejada Road from Spring Road to Los Angeles Avenue and Campus Park Drive from Princeton Avenue to Collins Drive including cost estimates, financing, phasing and water conservation measures. 20 Construct wall and landscaping improvements on north side of SR 118 between Millard Avenue and Spring Road. 21 Work with U.S. Postal Service and homeowner’s associations to relocate group mail boxes to maximize on-street parking. Page 90 of 144 94 22 Evaluate obtaining license agreements from private property owners to allow installing and maintaining drought tolerant landscaping on privately owned slopes on the north side of Princeton Avenue east of Spring Road (Tract 2723). 23 Extend Tierra Rejada raised median to east City limit. Public Works Storm Drains 1 Storm drain on Poindexter Avenue and Gabbert Road. 2 Evaluate feasibility of relocating the storm drain system on Poindexter Avenue just west of Endeavor Court. 3 Evaluate need for improvements to the Everett Street drainage basin. 4 Extend the Fremont Avenue drain north of SR-118 Page 91 of 144 95 Page 92 of 144 96 Fiscal Year 2022/23 Parks, Recreation & Community Services Future and Potential Projects Page 93 of 144 97 Parks, Recreation & Community Services Future and Potential Projects # Numbering is added for reference only, and does not indicate or suggest project priority, preference, or order of consideration. Facilities 1 Arroyo Vista Recreation Center: Install new security cameras 2 Arroyo Vista Recreation Center: Water conservation improvements, including hands-free fixtures and low flow urinals. 3 Arroyo Vista Recreation Center: Install three flag poles (U.S. flag, California flag, and City flag) to replace the single flag pole currently at the entrance. 4 City Hall / Civic Center: Determine appropriate locations and install security cameras throughout the Civic Center complex. 5 City Hall / Civic Center: Implement water conservation improvements including hands free restroom fixtures and waterless urinals at the Active Adult Center and Community Center. 6 City Hall / Civic Center: Install three flag poles (U.S. flag, California flag, and City flag) to replace the single pole located near the Active Adult Center. 7 City Hall / Civic Center: Install energy efficiency improvements including a drop-down ceiling with insulation at the Active Adult Center and in the Citrus Room, and replace windows at the Active Adult Center and Community Center with energy efficient dual-pane windows. 8 City Hall / Civic Center: Convert Citrus Room to make it a formal part of the Active Adult Center upon completion of the new City Hall building. 9 High Street Arts Center: Replace carpet throughout the theater. 10 High Street Arts Center: Renovate stage and install guardrail at the rear balcony to meet ADA requirements. 11 Moorpark Police Services Center: Renovate landscaping, including alternate landscape material adjacent to the vehicular parking stalls. 12 Moorpark Police Services Center: Install parapet walls to screen roof top equipment from view. 13 Moorpark Public Services Facility: Install a portable generator at the Public Services Facility. Page 94 of 144 98 14 Moorpark Public Services Facility: Replace parking lot lighting with LED lighting or other energy efficient alternative. 15 Moorpark Public Services Facility: Improve roof top drainage system to minimize runoff onto the parking lot and adjacent hardscape surfaces. 16 Moorpark Public Services Facility: Implement water conservation improvements, including hands-free fixtures and waterless urinals in restrooms 17 Moorpark Public Services Facility: Install an alternative fuel fueling station or electric vehicle charging station. 18 Ruben Castro Human Services Center: Install sidewalk on west side of Minor Street between Flynn Avenue and Fitch Avenue. 19 31 Poindexter Avenue: Modify building to accommodate widening of Moorpark Avenue. 20 General Facilities: Evaluate the feasibility of constructing a teen center or second recreation center. Landscape Maintenance Districts and General Landscaping 1 Renovate the landscaped parkway on the north side of LA Avenue between Shasta Avenue and Gabbert Road (Zone 7) to include drought tolerant plant material. Replace the existing pear trees with Crepe Myrtle trees. 2 Landscape north side of Poindexter Avenue from Gabbert Road east to vicinity of Chaparral School. 3 Renovate landscaped medians on Spring Road from Tierra Rejada Road to Peach Hill Road. 4 Install street trees on west side of Spring Road between Arroyo Simi and Peach Hill Road. 5 Renovate the landscaping at the Metrolink train station on the south side of the railroad tracks. Remove non-native landscaping along the pedestrian access walkway from Moorpark Avenue to the station and replace with native plant material. 6 Landscape excess right-of-way on southeast corner of Tierra Rejada Road and Moorpark Road and install standard curb and gutter. Remove pepper trees on the south side of Tierra Rejada Road and install native trees. Page 95 of 144 99 7 Install native landscape material and boulders within the freeway off ramp areas at Tierra Rejada Road and Highway 23/118. Install a City welcome sign with lighting at the northbound freeway off ramp at Tierra Rejada Road and install native landscaping. Renovate the landscaping at the LA Avenue northbound on ramp and off ramp. 8 Improve slopes adjacent to Peach Hill Wash Channel (Zone 10) for erosion control and landscape enhancement. Open Space 1 In conjunction with the Moorpark Watershed Parks, Recreation and Conservation Authority, develop a comprehensive site plan for the 80 Acre site, and identify appropriate uses for the site, potentially including: 1) Wetland area with interpretive center; 2) Seating area and access trail to the hill top view point; 3) Loop trail; 4) Bicycle/pedestrian connection to Tierra Rejada Road and adjacent communities; and/or 5) Restored riparian corridor. 2 Evaluate potential uses for the 200+ acre Meridian Hills open space, including possible trail connection to equestrian trail on Grimes Canyon Road. 3 Develop comprehensive site plan and evaluate potential uses for the 255 acre open space acquired from Waste Management along the City’s eastern border. 4 Evaluate potential passive recreation uses and enhancements for open space at Crawford Canyon. 5 Evaluate potential passive recreation uses for the SDI open space property. 6 Evaluate potential park and recreation uses for the asphalt area at the terminus of Ridgecrest Drive. Parks 1 Arroyo Vista Community Park: Upgrade and add additional lighting at AVCP ball fields. 2 Arroyo Vista Community Park: Construct a new pedestrian bridge to AVCP from southern terminus of Leta Yancy Road. 3 Arroyo Vista Community Park: Install walkway lighting on pedestrian bridge at south terminus of Leta Yancy Road. Page 96 of 144 100 4 Arroyo Vista Community Park: Add permanent or removable outfield fencing at the AVCP softball fields as deemed appropriate. 5 Arroyo Vista Community Park: Install a sand volleyball court. 6 Buttercreek Park Site: Determine disposition of Buttercreek Park site. 7 Campus Canyon Park: Renovate the basketball court. 8 Campus Canyon Park: Add parking lot. 9 Campus Canyon Park: Evaluate installing lights at the basketball court. 10 Campus Park: Replace concrete flatwork in the Campus Park picnic pavilion. 11 College View Park: Install a sand volleyball court. 12 College View Park: Install a second basketball court with lighting. 13 College View Park: Install lighting at the dog park. 14 College View Park: Install fencing along Campus Park Drive and Collins Drive, including corner. Install a park sign on Collins Drive frontage. 15 College View Park: Remove marquee base and install new park sign. 16 College View Park: Select a location to potentially add a soccer field. 17 College View Park: Evaluate the feasibility of constructing a fire station on a portion of the park. 18 Country Trail Park: Install a prefabricated restroom facility. 19 Country Trail Park: Improve natural area and improve landscaping along the slope. 20 Glenwood Park: Install coin operated lights at the basketball court. 21 Glenwood Park: Install a sand volleyball court. 22 Glenwood Park: Install a trail from Tierra Rejada Road to playground. 23 Glenwood Park: Remove marquee base and install new park sign. 24 Glenwood Park: Explore options to increase privacy at the Glenwood Park restroom. 25 Glenwood Park: Evaluate options for potential expansion of the park. Page 97 of 144 101 26 Mammoth Highlands Park: Install a sand volleyball court. 27 Mammoth Highlands Park: Reposition or add lights as needed at the basketball court. 28 Mammoth Highlands Park: Expand trail around perimeter of the park. 29 Miller Park: Install security lights behind the tennis courts. 30 Miller Park: Install loop trail with a connection to the adjacent nature trails. 31 Miller Park: Evaluate alternative uses for the sports field. 32 Monte Vista Nature Park: Install parking lot lighting. 33 Monte Vista Nature Park: Identify an appropriate location and install a shade structure. 34 Monte Vista Nature Park: Develop an overall site plan, removing non-native plant species and replacing them with native landscaping, demonstration gardens, interpretive signage, walkways, and seating areas. 35 Monte Vista Nature Park: Improve trail system including drainage and installation of slough walls. 36 Monte Vista Nature Park: Add security features at Laurelhurst Road entrance. 37 Mountain Meadows Park: Install a loop trail around the park perimeter. 38 Peach Hill Park: Replace the softball field lighting and add lighting to the soccer field. 39 Peach Hill Park: Renovate the picnic pavilion, including enclosing the roof, or remove the pavilion roof and replace it with a solid roof, comparable to pavilions at other City parks. 40 Peach Hill Park: Install a loop trail around the perimeter of the park. 41 Peach Hill Park: Evaluate adding a second driveway to the parking lot off Christian Barrett Drive. 42 Poindexter Park: Upgrade security cameras and install additional cameras as needed. 43 Poindexter Park: Improve security fencing around the perimeter of the skate park. Page 98 of 144 102 44 Poindexter Park: Replace metal and wood park amenities with concrete amenities, including the picnic tables in the picnic pavilion. 45 Poindexter Park: install outdoor exercise equipment along the path. 46 Poindexter Park: Determine alternative uses for turf area adjacent to the basketball court. 47 Post Office Potential Park Site: Evaluate feasibility of constructing park facilities on remnant property west of post office. 48 Tierra Rejada Park: Install coin operated lights at the basketball and tennis courts. 49 Tierra Rejada Park: Construct additional tennis court. 50 Tierra Rejada Park: Expand parking lot on Mountain Meadow Drive by approximately 14 spaces. 51 Tierra Rejada Park: Evaluate the feasibility of adding a volleyball court option to the basketball court. 52 Villa Campesina Park: Install security cameras and add additional security lighting as needed. 53 Virginia Colony Park: Install a full or half-court basketball court. 54 Walnut Acres Park: Install security cameras as needed. 55 Citywide Parks: Identify site and construct a facility to accommodate bicycle free-style and/or BMX riding. 56 Citywide Parks: Replace site lighting with LED lighting or other energy efficient alternatives at Campus Canyon, College View, Mammoth Highlands, Miller, Mountain Meadows, Peach Hill, Tierra Rejada, and Villa Campesina Parks. 57 Citywide Parks: Install various ADA improvements, including compliant walkways connecting public sidewalks to park walkways and amenities at Peach Hill, Monte Vista, Mountain Meadows, and Tierra Rejada Parks. Install upgrades at Villa Campesina Park, including parking and signage. 58 Citywide Parks: Select a site and design and install a therapeutic or sensory garden. 59 Citywide Parks: Determine appropriate locations for and install electronic messaging marquees. Replace the magnetic marquee at AVCP with an electronic marquee. Page 99 of 144 103 60 Citywide Parks: Select sites and install various permanent game equipment including a shuffleball court, horseshoe pit, and cornhole/beanbag toss pit. 61 Citywide Parks: Identify site and install a baseball field. 62 Citywide Parks: Select site and install an additional bocce ball court. 63 Citywide Parks: Identify additional park location and install a ball wall. 64 Citywide Parks: Evaluate parks for amenity improvements, including upgraded drinking fountains, electronic play systems, tandem swings, and other upgraded features. 65 Citywide Parks: Identify locations and install additional exercise equipment. 66 Citywide Parks: Install fitness circuit specific to Parkour training. 67 Citywide Parks: Select a park site to locate a tennis court in the Campus Park area. 68 Citywide Parks: Evaluate parks for installation of security cameras. 69 Citywide Parks: Evaluate parks/open space for development of a Community Garden. 70 Citywide Parks: Evaluate potential locations for a second dog park. 71 Citywide Parks: Evaluate installation of an outdoor performance venue/amphitheater. Trails 1 Construct a trail extending from the east end of Campus Park Drive, across the watercourse referred to as Drain No. 2, then south under the freeway through an existing access tunnel to Arroyo Drive. Prior year costs of $28,554 were for the development of a feasibility study to determine access and design requirements. Review and finalization of the study has been placed on hold. 2 Construct an improved bike path on the north side of the Arroyo Simi from AVCP pedestrian bridge to the east side of Spring Road. 3 Evaluate feasibility of connecting Moorpark Country Club equestrian staging area and the Meridian Hills equestrian staging area with a loop multi-use trail. 4 Evaluate possible uses for alternate State Route 23 and North Hills Parkway rights-of-way, including possible trail connection to College Heights Drive and Happy Camp Regional Park. Page 100 of 144 104 5 Evaluate feasibility of trail from Valley Road to Waterworks District No. 1 offices at Spring Road / Elk Run Loop intersection (will require ability to go under future North Hills Parkway to be constructed by Tract 5130, City Ventures). 6 Evaluate feasibility of a multi-use trail between Spring Road, Calleguas Water District Pump Station, and Miller Parkway through Tract 4980 / Serenata HOA Page 101 of 144 105 Page 102 of 144 106 Fiscal Year 2022/23 Public Works Completed Projects Page 103 of 144 107 Public Works Completed Projects Sorted by Year The following is a list of known CIP projects constructed subsequent to the incorporation of the City in 1983. Project Name Description 1985 Streets & Trails Sidewalk Construction East Side of Moorpark Avenue, Third Street to Los Angeles Avenue Sidewalk Construction West side of Moorpark Avenue from Community Center to High Street Sidewalk Construction West side of Moorpark Avenue from North of Poindexter Avenue to Third Street Asphalt Overlay Various Streets including High Street, Gabbert Road, Third Street, Bard Street, Sherman Avenue, Second Street and Sarah Avenue 1987 Streets & Trails Asphalt Overlay Spring Road South of Williams Ranch Road (by Developer) Sidewalk Construction South side of Williams Ranch Road (by Developer) Slurry Seal Project Various Streets throughout the City Railroad Crossing Construction of rubberized railroad crossing on Old Los Angeles Avenue (east of College View Avenue) Traffic Signals Los Angeles Avenue & Tierra Rejada Road Construction of a traffic signal at Los Angeles Avenue & Tierra Rejada Road / Gabbert Road Los Angeles Avenue & Condor Drive Construction of a traffic signal at this intersection Parkways and Medians Campus Park Drive Construction of landscape improvements to medians on Campus Park Drive (two Developers) Page 104 of 144 108 Project Name Description Tree Replacement Removal and replacement of parkway trees on a number of streets in the downtown area Spring Road & Peach Hill Road Construction of landscape improvements at the southwest corner Spring Road Drainage Improvement Construction of a box culvert on the west side of Spring Road south of Los Angeles Avenue 1988 Streets & Trails Tierra Rejada Bridge Construction of a four lane (with median) bridge across the Arroyo Simi Traffic Signals Traffic Signal: Los Angeles Avenue & Princeton Avenue Construction of a traffic signal at this intersection 1989 Streets & Trails Spring Road Railroad Crossing Construction of rubberized railroad crossing on Spring Road Moorpark Avenue Railroad Crossing Construction of rubberized railroad crossing on Moorpark Avenue Curb, Gutter, and S/W North side of High Street, east of Magnolia Street Asphalt Reconstruction & Overlay Various streets including Millard Street, Harry Street, Dorothy, Esther, Roberts Avenues, Laurelhurst Road, Campus Park Drive & Maureen Lane Traffic Signals Los Angeles Avenue & Science Drive Construction of a traffic signal at this intersection Tierra Rejada Road & Peach Hill Road Construction of a traffic signal at this intersection (Developer) Tierra Rejada Road & Walnut Creek Road Construction of a traffic signal at this intersection (Developer) Tierra Rejada Road & Mt. Meadows Drive Construction of a traffic signal at this intersection (Developer) Page 105 of 144 109 Project Name Description Storm Drains Moorpark Avenue Construction of storm drain improvements north of High Street (by Caltrans) 1990 Streets & Trails Slurry Seal Project Various streets throughout the City Sidewalk Construction East side of Spring Road, Los Angeles Avenue to Roberts Avenue (by Developer) Sidewalk Reconstruction Replacement of damaged sidewalks (including tree limb and root pruning) throughout the City. Traffic Signals Los Angeles Avenue & Spring Road Major reconstruction of the traffic signal at this intersection (by Developer) Traffic Signal: Campus Park Drive & Delfen St. Construction of a traffic signal at this intersection Parkways and Medians Tierra Rejada Road Median Construction of landscape improvements to Tierra Rejada Road medians from the Edison Easement easterly to a point east of Southhampton Road Tierra Rejada Road Parkway Construction of landscape improvements to the parkway on the north side of Tierra Rejada Road east of Peach Hill Road (Developer) 1991 Streets & Trails High Street & Spring Road Reconstruction of curb, gutter & sidewalk at southeast corner (by Caltrans) Avenida Colonia & Nogales Street Reconstruction of these two streets including the construction of new curbs, gutters and sidewalks and the construction of a portion of the Happy Camp Canyon covered box culvert to allow for the connection of these two streets Page 106 of 144 110 Project Name Description Los Angeles Avenue Widening North side street improvements from Liberty Bell Road to Maureen Lane, including an additional westbound travel lane, curb, gutter and sidewalk Sidewalk Construction West side of Spring Road, Los Angeles Avenue to Roberts Avenue Sidewalk Construction North side of Los Angeles Avenue between Spring Road and Millard Street Sidewalk Construction West side of Spring Road between Roberts Avenue and the railroad tracks Handicap Access Ramps Construction of handicap access ramps at various locations throughout the City Traffic Signals First St. / Poindexter Avenue @ Moorpark Avenue Construction of a traffic signal at this intersection to fulfill the City’s portion of a City/State Agreement to signalize both this intersection and Moorpark Avenue / High Street Storm Drains Happy Camp Box Culvert Construction of a covered box culvert for the Happy Camp drain at Los Angeles Avenue crossing (Unit III) and at the intersection of Nogales Street and Avenida Colonia 1992 Streets & Trails Sidewalk Reconstruction The reconstruction of the sidewalk on the east side of Tierra Rejada Road south of Los Angeles Avenue, including the replacement of street trees High Street Storm Drain and Sidewalks Construction of a storm drain from Walnut Street to Magnolia Street and a sidewalk on the north side of the street between Bard Street and Magnolia Street Charles Street Reconstruction (Ph. I) Reconstruction of the street from Moorpark Avenue to Bard Street, including the construction of a storm drain and new curbs, gutters and sidewalks Traffic Signals Spring Road & Peach Hill Road Construction of a traffic signal at this intersection Page 107 of 144 111 Project Name Description Collins Dr. & Campus Park Dr. Construction of a traffic signal at this intersection by Caltrans as a part of the freeway construction project High St. & Moorpark Avenue Construction of a traffic signal at this intersection by Caltrans to fulfill Caltrans’ portion of a City/State Agreement to signalize this intersection and Poindexter Avenue/First Street/Moorpark Avenue Peach Hill Rd & Spring Rd Construction of a traffic signal at this intersection Parkways and Medians Williams Ranch Road Landscape Barrier Construction of a landscaped barrier across Williams Ranch Road near the Edison Easement East side Tierra Rejada Road @ Los Angeles Avenue Replacement of the street trees on the east side of the street south of Los Angeles Avenue in conjunction with the reconstruction of sidewalks in that area 1993 Streets & Trails Asphalt Overlay Project Construction of an asphalt overlay on the following streets: 1) Tierra Rejada Road at the Route 23 Freeway; 2) Peach Hill Road; & 3) Campus Park Drive Slurry Seal Project Construction of Slurry Seal on various streets throughout the City Los Angeles Avenue @ Park Lane, etc. Construction of street improvements, storm drains, traffic signals, landscaping and related improvements on Los Angeles Avenue, Park Lane, Lassen Avenue and Liberty Bell Road required for the construction of the Mission Bell Plaza, funded by Assessment District 92-1 [**CMP]. Peach Hill Road East of Spring Road Extension of Peach Hill Road east of Spring Road to the future Science Drive (constructed by the developer of the Carlsberg Specific Plan to serve the Mesa Verde Middle School) Page 108 of 144 112 Project Name Description Traffic Signals Tierra Rejada Rd & Spring Rd Street widening project included the construction of a “permanent” traffic signal to replace the temporary traffic signal at this location [**CMP] Los Angeles Ave & Park Lane Construction of a traffic signal at this intersection as a part of the street and storm drain improvements funded by Assessment District 92-1 [**CMP] Los Angeles Avenue & Liberty Bell Road Construction of a traffic signal at this intersection as a part of the off-site and storm drain improvements funded by Assessment District 92-1 [**CMP] Parkways & Medians Sherman Avenue Property Wall Replacement of the rear property walls for the properties on the south side of Sherman Avenue (north side of Los Angeles Avenue between Spring Road and Millard Street) Los Angeles Avenue: Spring Road to Millard Street Construction of parkway landscaping on the north side of Los Angeles Avenue between Spring Road and Millard Street Tierra Rejada Road / Peach Hill Road Slope Repair Repair of a slope failure on the south side of Tierra Rejada Road east of Peach Hill Road Storm Drains Sunnyslope Place Debris Basin Access Road Construction of an access road to facilitate the maintenance of a storm water debris basin north of Sunnyslope Place 1994 Streets & Trails Lassen Alley Improvements Construction of pavement improvements to complete the drainage improvements at the south end of McFadden Avenue and Cornett Avenue Charles Street Reconstruction (Ph. II) Reconstruction of the street from Bard Street to Spring Road, including the construction of a storm drain and new curbs, gutters and sidewalks Page 109 of 144 113 Project Name Description Spring Road Berm Construction of an asphalt berm on the east side of the street north of Peach Hill Road in order to prevent erosion of the slope supporting the street Flory Area Sidewalks Construction of sidewalks on certain streets in the vicinity of Flory Elementary School, partially funded by an SB-821 pedestrian facility grant, including Second Street, Bard Street, Third Street, Flory Avenue, Millard Street, Roberts Avenue, and Harry Street Tierra Rejada Road Realignment and Reconstruction Realignment and reconstruction of Tierra Rejada Road east of Spring Road, increasing the roadway to four lanes and adding a center raised median [**CMP] Grimes Canyon Road Street improvements (including widening) near the entrance (Turfway Road) to Tract 4081 (constructed by the developer) Park Lane and Lassen Avenue Improvements to Park Lane north of Los Angeles Avenue and Lassen Avenue, to serve the Mission Bell Plaza Shopping Center (AD 92-1) Traffic Signals Tierra Rejada Road & Mountain Trail Street Construction of a traffic signal at this intersection (Developer) [**CMP] Tierra Rejada Rd & Arroyo Vista Access Rd / Countrywood Drive Construction of a traffic signal at this intersection (Developer) [**CMP] Tierra Rejada Road @ Shopping Center Entry Construction of a traffic signal at this intersection (Developer) [**CMP] Parkways & Medians Tierra Rejada Rd Median at Spring Rd Installation of landscaping in the extension of the center median in Tierra Rejada Road just west of Spring Road Shasta Avenue / Los Angeles Avenue Wall [NE Corner] Construction of a block wall and landscaping at the northeast corner of Los Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements East Side Spring Road South of Peach Hill Road Construction of parkway landscaping on the east side of Spring Road south of Peach Hill Road Page 110 of 144 114 Project Name Description Los Angeles Avenue @ Shasta Avenue Construction of parkway landscaping on the north side of Los Angeles Avenue at Shasta Avenue Storm Drains AD 92-1 Construction of storm drains along the north side of Los Angeles Avenue, Park Lane, and within easements on the Mission Bell Plaza property 1995 Streets & Trails High Street Decorative Street Lights Installation of underground conduits for electrical, telephone, cable television, street lights and a decorative lighting system, plus the installation of nostalgic decorative street lights on High Street Freeway Connector Project Construction of bridges and related improvements required to connect the Route 23 Freeway to the Route 118 Freeway (Caltrans) [**CMP] City Maintenance Yard Conversion of property at 675 Moorpark Avenue to a City Maintenance facility Metro Link Parking Lot/Driveway Construction of the south Metro Link parking lot and access driveway (SCRRA) [**CMP] Lassen Avenue @ Mission Bell Plaza Modifications to Lassen Avenue to provide entrances to the north end of the Mission Bell Plaza Shopping Center parking lot from Sierra Avenue and from Park Lane Slurry Seal Project Application of slurry seal and related work to approximately one-third of the residential streets in the City Tecolote, Canario, Etc. Construction of an asphalt overlay on Tecolote Court, Canario Court, and a portion of North Granadilla Drive Walnut Canyon Road @ Casey Road Widening of Route 23 by Caltrans to provide a center turning lane at Wicks Road and Casey Road First Street/Bard Street Reconstruction of First Street and Bard Street including reconstruction of pavement, curb, gutter and sidewalks Page 111 of 144 115 Project Name Description Parkways & Medians Moorpark Estates Entry Installation of entry signs at Shasta Avenue and Los Angeles Avenue and at Poindexter Avenue and Sierra Avenue Shasta Avenue/Los Angeles Avenue Wall [NW Corner] Construction of a block wall and landscaping at the northwest corner of Los Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements Poindexter Avenue @ Sierra Avenue Construction of parkway landscaping on the south side of Poindexter Avenue at Sierra Avenue Princeton Avenue Construction of parkway and median landscaping on Princeton Avenue Campus Park Drive Construction of parkway landscaping on the south side of Campus Park Drive east and west of Princeton Avenue Tierra Rejada Road Slope Restoration Restoration of slope slippage on the south side of Tierra Rejada Road near Peach Hill Road Bard Wall Construction of a wall at the north end of Bard Street, just north of First Street Virginia Colony Planter Construction of a landscaped planter at the corner of Virginia Colony Place and Los Angeles Avenue Irrigation Crossover Conduits Construction of conduits for future irrigation water lines and valve control wires at a number of locations including: Tierra Rejada Road at Courtney Lane; Courtney Lane on the west side of Tierra Rejada Road and Southhampton Road at Tierra Rejada Road Spring Road Parkway Trees Removal and replacement of damaged sidewalks and the installation of tree well grates along the west side of Spring Road south of Peach Hill Road, to preserve existing parkway trees. 1996 Streets & Trails Millard Street Area Sidewalks Construction of sidewalks on Sherman Avenue, Esther Avenue, Roberts Avenue and other streets Poindexter Avenue Complete reconstruction of this street west of Chaparral Middle School Page 112 of 144 116 Project Name Description Everett Street Complete reconstruction of this street, including curb, gutter and sidewalk Walnut Street Complete reconstruction of this street, including curb, gutter and sidewalk Bard Street Complete reconstruction of this street between Charles Street and High Street Magnolia Street Complete reconstruction of this street north of Charles Street Tierra Rejada Road Construction of an asphalt overlay on this street east of Spring Road Spring Road Construction of an asphalt overlay on this street south of Peach Hill Road Old Los Angeles Avenue Construction of an asphalt overlay on this street east of the rail crossing located east of Collins Drive Flory Avenue Construction of an asphalt overlay on this street Magnolia Street Construction of an asphalt overlay on this street south of Charles Street Goldman Avenue Construction of an asphalt overlay on this street Spring Road Median / Double Left Turn Lane Construction of modifications to the south leg of the intersection of Spring Road and Los Angeles Avenue to provide for a double left turn lane and a raised center median Painted Sky Street Subsidence Repair Repair of street improvements damaged by a street subsidence Public Works Yard Expansion Construction of additional improvements to expand the City Maintenance Yard at 675 Moorpark Avenue Traffic Signals Collins Drive & Campus Park Drive Construction of a traffic signal at this intersection by Caltrans, as a apart of the Freeway Connector construction project Moorpark Road & Tierra Rejada Road Construction of a traffic signal at this intersection by the City, with partial funding from the County of Ventura Page 113 of 144 117 Project Name Description Parkways & Medians Home Acres Buffer Area Construction of a landscaped buffer area, including an emergency access road and a flood control maintenance road, at the west end of Shadyridge Drive in Tract 4021 (funded by Zone 8 of AD 84-2) Storm Drains Tierra Rejada Road Sub-Drain System Construction of a sub-drain system along Tierra Rejada Road between Walnut Canyon Road and Mountain Trail Street to convey subsurface water to storm drain inlets Tierra Rejada Road Inlet East of Spring Road Installation of a catch basin on the north side of the center median on Tierra Rejada Road east of Spring Road 1997 Streets & Trails Flinn Avenue Reconstruction Reconstruction of Flinn Avenue east of Spring Road, constructed in conjunction with the Spring Road storm drain project Moorpark Avenue [South] A/C Overlay Construction of an asphalt overlay on this street, constructed in conjunction with the construction of the Moorpark Avenue storm drain project AVCP Access Bridge Construction of a pedestrian, equestrian, emergency access bridge across the Arroyo Simi, to connect Arroyo Vista Community Park to Liberty Bell Road Arroyo Vista Community Park Bike Path Construction of a paved surface between the end of the park access road and the Arroyo Vista Park Access Bridge, partially funded by an SB-821 bicycle facilities grant Storm Drains Moorpark Avenue Storm Drain System Construction of a storm drain system extending from the south side of Los Angeles Avenue northerly to a point north of First Street, with storm drain laterals serving Flory Avenue and the Metrolink parking lot Page 114 of 144 118 Project Name Description Spring Road Storm Drain System Construction of a storm drain system extending from the south side of Los Angeles Avenue northerly to Flinn Avenue, and then extending easterly on Flinn Avenue 1998 Streets & Trails Downtown Alley Reconstruction Reconstruction of the alleys south of First Street Valley Road Reconstruction of the street Wicks Road Slope Stabilization Construction of retaining walls and related improvements required to provide slope stabilization to support Wicks Road Wicks Road A/C Overlay Construction of an asphalt overlay on the westerly portion of this street Bonnie View Street A/C Overlay Construction of an asphalt overlay on this street Maureen Lane Reconstruction Reconstruction of Maureen Lane south of Los Angeles Avenue Storm Drains Science Drive Storm Drain System Construction of two storm drain systems serving the Carlsberg Specific Plan (by Developer), one serving the streets and a separate system conveying run-off from common areas to vernal ponds 1999 Streets & Trails Peach Hill Road Widening to the south side of the street east of Spring Road, in order to provide a westbound left-turn lane. Poindexter Avenue Widening to the north side of the street east of Gabbert Road, including new curb, gutter and sidewalk, and the re-striping of the street to provide a painted median and Bike Lanes. New Los Angeles Avenue Widening Widening to the south side of the street to provide six (6) lanes of traffic (by Developer). [**CMP] Page 115 of 144 119 Project Name Description Spring Road Widening Construction of widening to the east side of Spring Road from Tierra Rejada Road northerly to the Arroyo Simi Bridge (by developer). Casey Road Widening Widening to the south side of the street west of Walnut Canyon Road. Old L.A. Avenue Rail Crossing Surface crossing improvements to the rail crossing (by SCRRA). Gabbert Road Surface crossing improvements to the rail crossing (by Union Pacific). Miller Parkway Construction of a new collector street between Tierra Rejada Road and New Los Angeles Avenue (by developer). Tierra Rejada Road Improvements to the north side of the street, just west of the freeway (by developer). Traffic Signals Casey Road/Walnut Canyon Road Construction of a traffic signal, funded by the City, Caltrans and the Moorpark Unified School District. [**CMP] Peach Hill Road and Miller Parkway Installation of a new traffic signal at this new intersection (by developer). Tierra Rejada Road and Miller Parkway Installation of a new traffic signal at this new intersection (by developer). [**CMP] Commercial Entry and Miller Parkway Installation of new traffic signal at this new intersection (by developer). This signal is to be made operational when the center is opened. New Los Angeles Avenue & Miller Parkway Modifications to the traffic signal at the intersection of New Los Angeles Avenue and Science Drive, to accommodate the addition of Miller Parkway as the south leg of the intersection. (by developer) [**CMP]. New Los Angeles Avenue at the Route 23 Freeway Installation of traffic signals at the on and off-ramps to the freeway, in order to allow ingress and egress traffic to and from White Sage Road (private) [by Caltrans and the developer]. Parkways & Medians Spring Road Medians and Parkways Construction of new landscaped medians and parkways (east side) from Tierra Rejada Road northerly to the Arroyo Simi Bridge (by developer). Page 116 of 144 120 Project Name Description 2000 Streets & Trails Spring Road Bridge Reconstruction of the Spring Road Bridge at the Arroyo Simi, to provide sidewalks, bike lanes and a raised median. Asphalt Overlay The construction of an asphalt overlay and related improvements to the following streets: Talmadge Rd.; Marquette St.; Gabbert Rd. (north of Poindexter Ave.); Spring Road (north of High St.); Fitch Ave.; Minor St.; Robert St.; Harry St.; Ruth Ave.; Dorothy Ave.; Mt. Trail (east of Walnut Creek Rd.); Collins Dr.; Campus Park Dr.; Princeton Ave.; High Street; Spring Road (New L. A Ave. to Bridge); and Christian Barrett Drive. Spring Road Rehabilitation Rehabilitation of Spring Road between New Los Angeles Avenue and High Street. The cost of this project was reimbursed by Caltrans as required by a Highway Relinquishment Agreement. Los Angeles Avenue Rehabilitation Rehabilitation of Los Angeles Avenue between High Street and Princeton Avenue. The cost of this project was reimbursed by Caltrans as required by a Highway Relinquishment Agreement. Upgrades to the middle portion of this street segment are being deferred until the Los Angeles Avenue East project is constructed. Parkways & Medians Freeway Landscaping Installation of freeway landscaping from Collins Drive to a point west of Princeton Avenue (by Caltrans). Storm Drains Tierra Rejada Road Inlets Construction of additional storm drain inlets to better handle peak storm flows. L.A. Ave. Drain Installation of new inlets east of Spring Road to eliminate flooding. Page 117 of 144 121 Project Name Description 2001 Streets & Trails New Los Angeles Avenue Bridge Widening Widening to the south side of the New Los Angeles Avenue [SR-118] bridge over the Arroyo Simi to provide six (6) lanes of traffic. [**CMP] Los Angeles Avenue: Moorpark Avenue to Park Lane Widening to the south side of the street to provide three (3) eastbound lanes (by Developer). [**CMP] Los Angeles Avenue: East of Leta Yancy Rd Construction of street widening to the south side of the street at the old Caltrans Maintenance Yard, in order to provide three (3) eastbound lanes, curb, gutter and sidewalk. [**CMP] Traffic Signals Los Angeles Avenue & Tierra Rejada Road Modifications to the striping to provide a double left- turn lane at the east leg of the intersection. [**CMP] Parkways & Medians Los Angeles Avenue Installation of median landscaping and irrigation in the new raised median on Los Angeles Avenue south of the Princeton Avenue freeway ramps. Tierra Rejada Road Installation of parkway landscaping on the north side of Tierra Rejada Road east and west of Southhampton Road, funded by the Zone 2 improvement assessment [AD84-2]. 2002 Streets & Trails Underground Utility District No. 2000-1 The undergrounding of all overheard utilities, other than high voltage electrical lines, on Los Angeles Avenue between Gabbert Road and Millard Street. Project was constructed by SCE and funded by SCE pole replacement monies and Rule 20A undergrounding accruals. Miller Parkway/Peach Hill Road U-Turn Construction of widening at the northeast corner to allow south-to-north U-Turn movements. Page 118 of 144 122 Project Name Description 2003 Streets & Trails Arroyo Trail Study Feasibility Study and Implementation Plan for an arroyo levee trail from the westerly City limit to Madera Road in the City of Simi Valley. Moorpark Road Realignment City costs related to a County of Ventura Road Department Project to construct a new, realigned Moorpark Road intersecting Tierra Rejada Road at Miller Parkway. Curb Ramp Project Construction of curb ramps at a number of locations (mainly “T-intersections”) throughout the City. 2003 Slurry Seal Project Application of Slurry Seal to approximately one-third of the streets in the City. 2003 AC Overlay Project Construction of an asphalt overlay on a number of streets throughout the City. GASB-34 Infrastructure Inventory Report Preparation of a study to inventory, quantify, categorize and determine the value of the City’s infrastructure improvements. Depreciation rates and replacement cost estimates were also derived from that effort. Curb / Gutter Repair Project Replacement of damaged curb and gutter at numerous locations throughout the City. Parkways & Medians Peach Hill Road Parkway Construction of parkway landscaping on Peach Hill Road between Mesa Verde Drive and Peach Hill Park. This project was constructed by the Peach Hill HOA Traffic Signals L.A. Avenue at the Marketplace Shopping Center Installation of a new traffic signal by the developer of the shopping center. Miller Parkway & Patriot Drive Installation of a new traffic signal by the developer of the shopping center. Page 119 of 144 123 Project Name Description 2004 Streets & Trails Flinn Avenue Realignment The realignment of Flinn Avenue to align with Second Street. The project included the widening of Spring Road north of Flinn Avenue, the construction of a raised median on Spring north of Flinn Avenue and the construction of a traffic signal at the intersection of Spring Road and Second Street. Civic Center Driveway Modification The widening of the driveway into City Hall. Street Light Modification – Millard Tract A CDBG funded project to relocate and add street lights in the neighborhood southeast of Moorpark Avenue and First Street. Traffic Signals Double Left-Turn lane on Spring Rd at Tierra Rejada Rd Construction of improvements to provide a double left- turn lane for southbound traffic. Spring Rd and Second Street Construction of a traffic signal at the intersection of Spring Road and Second Street / Flinn Avenue. Parkways & Medians Spring Road Parkway West side Removal of existing eucalyptus trees and the construction of new tree wells, with deep root irrigation, between Peach Hill Rd. and Christian Barrett Drive. Tierra Rejada Rd Parkway, East side Removal of existing trees and installation of new tree wells, with deep root irrigation, between Harvester and Courtney. Spring Road Median Installation of median landscaping north of Second Street. Storm Drains Loraine Drain Construction of storm drainage facilities northwest of the Spring Road Bridge (by a developer) to meet needs identified in the Master Drainage Study as the “Loraine Drain” or the “No Name Drain”. Page 120 of 144 124 Project Name Description 2005 Streets & Trails Grimes Canyon Road at Championship Drive Construction of roadway improvements by a Developer. City costs related to the acquisition of needed rights-of-way were reimbursed by the Developer. Traffic Signals Casey Signal Modification The modification of the traffic signal at Casey Road and Walnut Canyon Road [State Route 23] to provide a left-turn arrow for northbound traffic [funded by developer (Pardee Homes)]. Storm Drains Little Hollow Sub Drain Construction of a sub-drain to intercept subsurface water and convey same to a storm drain in an effort to prevent future damage to the asphalt pavement. 2006 Streets & Trails Los Angeles Avenue Widening at Maureen Lane Construction of roadway widening to the south side of the street, including addition pavement, curb, gutter, sidewalk and property walls, and the construction of a traffic signal at the intersection of Los Angeles Avenue and Maureen Lane. [**CMP] Traffic Signals Los Angeles Avenue at Maureen Lane Construction of a traffic signal at this intersection. [**CMP] Parkways & Medians Tierra Rejada Road Medians Construction of median landscaping on Tierra Rejada Road between Spring Road and the Route 23 freeway. Page 121 of 144 125 Project Name Description 2007 Streets & Trails Freeway Sign Replacement Replacement of freeway off-ramp signs required by street name changes for New Los Angeles Avenue and Princeton Avenue. Downtown Trail Study The Downtown Trail Study was completed. Future implementation will be considered when and if funding sources are identified. Spring Road Extension Construction of the extension of Spring Road northerly from Charles Street to connect to Walnut Canyon Road. ‘C’ Street (Ridgecrest Drive) Construction of the east-west local collector street (Ridgecrest Drive) along the northerly boundary of the City (Pardee Homes), from Spring Road easterly to the proposed realigned Route 23. Spring Road Wall Construction of a block wall and landscaping on the west side of Spring Road from Los Angeles Avenue to the railroad crossing. Traffic Signals Campus Park Drive and Collins Drive Signal and striping changes were funded and constructed by the developer of the property at the southwest corner. Spring Road and Charles Street New traffic signal installed by developer. Spring Road and Elk Run Drive New traffic signal installed by developer. Spring Road and Ridgecrest Drive New traffic signal installed by developer. Spring Road and Walnut Canyon Road (SR-23) New traffic signal installed by developer. Traffic Controller and Operations Improvements Construction of controller and other hardware, improvements, and/or for the upgrading of traffic signal operations through improved software, at designated intersections. Page 122 of 144 126 Project Name Description Parkways & Medians Los Angeles Avenue and Tierra Rejada Rd Parkways Construction of parkway landscaping on the south side of Los Angeles Avenue from Butter Creek Road to Maureen Lane, and the construction of parkway and median landscaping on Tierra Rejada Road south of Los Angeles Avenue. Princeton Avenue Median Modification Modification of the median and median landscaping on Princeton Avenue at Campus Park Drive. 2008 Streets & Trails Lighted Crosswalk on Moorpark Avenue at Second Street Replacement of freeway off-ramp signs required by street name changes for New Los Angeles Avenue and Princeton Avenue. Asphalt Overlay Projects Construction of an asphalt overlay, and related work, along the entire length of Tierra Rejada Road and on Second Street. Slurry/ARAM Project Pavement rehabilitation of various City streets completed in FY 08/09. Traffic Signals Traffic Signal Interconnect: Los Angeles Avenue Construction of a hardwire traffic signal interconnect system to allow for the coordination of all of the traffic signals along the Los Angeles Avenue corridor (SR- 118). Traffic Signal Interconnect: Tierra Rejada Road Construction of a hardwire traffic signal interconnect system to allow for the coordination of all of the traffic signals along Tierra Rejada Road between Countrywood Drive and the Route 23 freeway. 2009 Streets & Trails Moorpark Road DualLeft Turn Lanes Perform intersection modifications to provide dual left turn lanes on Moorpark Road to Tierra Rejada Road. Lassen Avenue Bikeway/Walkway Construction of a Bikeway/Walkway path extending westerly from Moorpark Avenue near Third Street, within the Lassen Avenue street right-of-way. Page 123 of 144 127 Project Name Description High Street Rehabilitation Widening and extension of High Street west of Moorpark Avenue and construction of Post Office parking lot. Parkways & Medians Tierra Rejada Road Medians Construction of median landscaping on Tierra Rejada Road between Brennan Road and the Route 23 freeway. Storm Drains Walnut Canyon Drain Improvement Replacement of open channel drain with covered reinforced concrete pipe from the west end of the High Street extension to approximately 350 feet north of High Street 2010 Streets & Trails Mountain Trail Street/ Spring Road Pavement Rehabilitation Pavement rehabilitation and construction of a landscaped median in Mountain Trail Street from Tierra Rejada Road to Country Hill Road, and pavement rehabilitation on Spring Road from Peach Hill Road to a point approximately 2000 feet to the south. Julliard Avenue and Reedley Street Overlay Asphalt overlay of Julliard Avenue from Campus Park Drive to Loyola Street and Reedley Street from Julliard Avenue west to the end due to damage caused by a ruptured waterline. Parkways & Medians City Entry Signs Installation of City Entry Signs on Princeton Avenue on each side of the 118 Freeway; and on Tierra Rejada west of the 23 Freeway. Mountain Trail Street/ Spring Road Pavement Rehabilitation Construction of a landscaped median in Mountain Trail Street from Tierra Rejada Road to Country Hill Road. Page 124 of 144 128 Project Name Description 2011 Streets & Trails Metrolink Security Wall & Camera System Extension of the security wall along the Metrolink south parking lot property line. Metrolink security camera system completed in FY 07/08. Traffic Signal Collins Drive and University Drive Construction of a traffic signal at the intersection of Collins Drive and University Drive. Los Angeles Avenue and Tierra Rejada Drive Modification of the traffic signal to provide protected phases (Left Green Arrows) for the north and south legs of the intersection, as well as a right green arrow for northbound Tierra Rejada Road [**CMP] 2012 Streets & Trails Alderbrook Street Asphalt Overlay Asphalt overlay on Alderbrook Street from Honeybrook Court to River grove Court and on Walnut Creek Road from Tierra Rejada to Misty Grove Street. 2012 Pavement Rehabilitation ARAM and slurry seal of various City Streets. 2012 Sidewalk Reconstruction Replacement of sidewalks, curbs, and gutter at various locations. Spring Road Overlay Asphalt overlay on northbound Spring Road from Flinn Avenue to the railroad crossing. Storm Drains Spring Road Storm Drain Installation of a catch basin on northbound Spring Road at the Police Services Center driveway with a connection to the existing storm drain on the west side of Spring Road. The project included a storm drain connection to the Ruben Castro Human Services Center site. Page 125 of 144 129 Project Name Description 2013 Streets & Trails SR- 23 FWY Sound wall at Tierra Rejada Construction of freeway sound walls adjacent to the homes on Crab Apple Court at the eastern boundary of Tract 4975 (Toscana at Serenata) within the Carlsberg Specific Plan area, bordering the west side of the SR-23 Freeway 2013 Pavement Markings Replacement of faded pavement striping, arrows and legend at various locations. 2014 Streets & Trails Railroad crossing at Spring Road Street widening and at-grade rail crossing improvements including a center median, four vehicle crossing gates, pedestrian crossing gates, concrete sidewalk, dedicated northbound right turn lane and bike lanes in both directions. Campus Canyon Drive Crosswalk Relocation of the crosswalk on Campus Canyon Drive at Monroe Avenue and Construction of new curb ramps. 2015 Streets & Trails 2015 Pavement Rehabilitation ARAM, slurry seal, and crack-fill of various City Streets. 2016 Streets Los Angeles Avenue Widening at Shasta Avenue Widen south side of Los Angeles Avenue at Shasta Avenue. This project added a third eastbound lane, constructed sidewalk, temporary storm drains, and provided structural protection to Calleguas MWD transmission pipeline. Page 126 of 144 130 Project Name Description Moorpark Avenue Left-Turn Lane SCRRA’s sealed corridor work widened Moorpark Avenue between Poindexter Avenue and High Street. The crossing received channelizing median and sidewalks, additional safety devices and gates, and improved signal at High Street. 2018 Streets Asphalt Overlay of Spring Road, Princeton Avenue, Poindexter Avenue, Gabbert Road Asphalt overlay and curb ramp replacements. 2019 Streets Campus Canyon- University Drive Slurry Seal Project Slurry seal pavement rehabilitation project. 2020 Streets Metrolink South Parking Lot South Entry Construction of a second entrance connecting the South Parking Lot to First Street. Also included widening of existing parking lot driveway. 2021 Streets Downtown Area Slurry Seal Pavement rehabilitation on Dorothy, Ruth, Sarah, Susan, Roberts, Ester, Shasta, Sierra, Diablo, Palomar, Whitney, Lassen and Everest Avenues; Second, Millard, and Harry Streets; and Lassen Court. Streetlight Acquisition and Retrofit Acquisition of Southern California Edison Streetlight System and retrofit to LED. (Joint effort between Parks, Recreation and Community Services and Public Works). 2022 Page 127 of 144 131 Project Name Description Streets Downtown Sidewalk Rehabilitation Sidewalk rehabilitation within the boundaries of Redevelopment Area. The scope of work and improvements include sidewalk repair, replacement, curb cuts, access ramps, and street transitions. Page 128 of 144 132 Fiscal Year 2022/23 Parks, Recreation, & Community Services Completed Projects Page 129 of 144 133 Parks, Recreation & Community Services Completed Projects; Sorted by Location Project Name/Item Description Date (Mo/Yr) FACILITIES Active Adult Center Center Expansion 3/2000 Kitchen Air Conditioning 9/2000 Automatic Sliding Door 9/2000 Kitchen Renovation (Sinks/Oven) 6/2015 Arroyo Vista Recreation Center Gymnasium Construction 1/1993 Recreation Center Building Construction 1/1993 Retaining Wall, Recreation Center 1/1993 Scoreboard (2) for Gym 1/1993 Lights, 13 Steel Outdoor 1/1999 LED Scoreboard (2) for Gym 8/2003 Video Monitoring System 9/2004 Theater System 1/2007 Recreation Center Building Expansion 8/2008 Sound System and Sychronizer 11/2011 Basketball Backboards for Gym 9/2014 Scoreboard (2), Shot Timer, Receivers for Gym 9/2014 Telescopic Bleachers for Gym 1/2015 City Hall City Hall Building Construction 1/1988 Generator, Backup 1/1990 Generator, Emergency 7/2000 Telephone System, Cable, and Consultant 7/2001 Computer Room Fire System 4/2005 City Hall Audio System 8/2005 Page 130 of 144 134 Project Name/Item Description Date (Mo/Yr) Heat Pump Condensing Unit #1, #2, & #3 3/2011 Modular Building - Annex 1/1992 Analyzer, Mercury Vapor Annex 1/2002 Dosimeter, Personal Alarm Annex 4/2002 Annex Improvements 1/2007 Modular Building - Break Room/File Room 9/2010 Modular Building - Development Services 9/2010 Fire Sprinkler System Development Services Modular 6/2012 ADA Improvements 2013 Community Center Community Center Building Construction 1/1981* Flagpole 1/1981* Lights, 7 Steel Outdoor 1/1981* Patio Wall, Block W/Stucco 1/1981* Paving, Asphalt 1/1981* Land, Civic Center 5/1984 Kitchen Improvements 1/1988 A/V Improvements 1/1988 A/V Improvements 1/1995 A/V Improvements 1998-2001 Roof Repair/Construction 2/2000 Video Monitor, Motion Media, Camera/Audio Systems 4/2002 Broadcasting System & Video System Refurbishment 6/2002 Pioneer Dual DVD Recorders (2) 9/2003 Water Heater 2/2005 A/V Improvements 2005 Lighting System 1/2006 Speakers, Rack And Mount 1/2006 Projector System & Install 10/2007 CC Video Control Room Upgrade 6/2008 Heat/Vent AC #1, 2, 3, 4, 8, 9, & 10 8/2010 Page 131 of 144 135 Project Name/Item Description Date (Mo/Yr) A/V Improvements 2010-2015 Camera, Video HD (4) & Remote Camera Controller 2/2015 Parking Lot Improvements 12/2015 High Street Arts Center Complex Building & Land Purchase 7/2005 Sound System & Projector 4/2007 Property Acquisition (33 High Street) 12/2007 Moving Lights (4) 7/2011 Audio Wireless Personal Monitor 4/2012 Property Acquisition (61 High Street) 1/2016 Library Land, Access Road & Parking Lot 5/1984 Land, Building 12/2006 Media Drop 1/2011 Police Service Center Land, Police Service Center 4/2001 Police Service Center Construction 6/2006 Security, Video System 6/2006 Surveillance, Video System 6/2006 Fire Protection System Fm200 12/2010 Lighting Upgrades 5/2014 Parking Lot Paving 2/2016 Public Art Installation: Thin Blue Line Sculpture 10/2018 Post Office Land Parcel 8/1993 Land Post Office Downtown Parking Lot 1/2011 Post Office Parking Lot Improvements 1/2011 Public Service Facility Land, MPSF 2/2002 Public Services Facility Construction 4/2007 Page 132 of 144 136 Project Name/Item Description Date (Mo/Yr) Fence, Chain Link 7/2004 Iron Fence Install & Gate Keypad 2/2008 Ice Maker, Cube-Style 2/2013 Card Reader Entry System 11/2015 Ruben Castro Human Services Center Land - 2 Acre Parcel Map 5426 6/2003 Land, Parking Lot 5/2010 Public Art: We Are One Family 4/2012 Concrete Footing for Art 7/2013 Building B Construction 7/2013 Emergency Generator, Engine & Alternator 7/2013 Heat/Vent AC Units (14 Total) 7/2013 Irrigation Controller 7/2013 Pre-Fab Sunshade for Building B 8/2014 Courtyard Gate Replacement 11/2016 Tierra Rejada Road/Mountain Trail Street Intersection 911 Memorial Sculpture/Fountain 3/2002 LANDSCAPE MAINTENANCE DISTRICTS AND GENERAL LANDSCAPING Spring Road / Ridgecrest Drive Streetscape Revitalization 10/2018 Championship Drive Landscape Renovation 9/2019 Tierra Rejada Road Streetscape Revitalization 12/2019 Central Irrigation System 6/2021 PARKS Arroyo Vista Community Park Land, Access Road 7/1983 Land, Park Site 5/1984 Land, Park Site 1/1988 Land, Access Road 9/1992 Page 133 of 144 137 Project Name/Item Description Date (Mo/Yr) Phase I Construction 1/1993 Land, Access Road 5/1996 Football Field Goal Post (2 Total) 9/1997 Multi-Purpose Court w/Fence 1/1999 Patio And Pathways Paving, Concrete 1/1999 Tennis Court Construction 12/1999 Tennis Court Sport Wall 4/2000 Conceptual Design Phase II 11/2000 Pool CAD Mapping, Topo Survey, Geotechnical 12/2000 Restroom Building (East) Design & Construction 6/2001 Soccer Goals (4 Total) 8/2001 Drinking Fountain Galvanized 11/2002 Football Field Fence 9/2003 Park Entry Guardrail 6/2004 Phase II Expansion Construction 11/2004 Pump, Submersible Well #1 10/2008 Playground Structures and Swings 7/2010 Irrigation Control Panel System Wells #1 & 3 6/2014 Pump, Sewage Submersible #1 & #2 6/2014 Vfd Sewer Control Panel 6/2014 Public Art: Lithomosaics And Bronze Toad 11/2014 Parking Lot Improvements 12/2015 Slope Retaining Wall 2/2017 Recreational Trail 6/2017 Parking Lot Improvements 6/2017 Lighting Improvements 6/2017 Multi-Use Court Improvements 8/2017 Access Road Improvements 12/2017 Buffer Zone Land, Home Acres Buffer Zone 4/1994 Turf Replacement 1/2016 Page 134 of 144 138 Project Name/Item Description Date (Mo/Yr) Buttercreek Park Land, Park Site At Daisy/Peppermill Street 5/1984 Land, Park Site at Peppermill Street 5/1984 Campus Canyon Park Land, Park Site 10/1986 Retaining Wall, Block 4/1990 Softball Field Backstop 1/1994 Drinking Fountains 1/1994 Fence, Ball Field 1/1994 Fence, Steel Bar & Block 1/1994 Lights, 5 Steel Outdoor 1/1994 Paving, Concrete Group 1/1994 Picnic Pavilion 1/1994 Sand Pit for Playground 1/1994 Restroom 1/1994 Retaining Wall, Block/Stucco 1/1994 Fence, Replace Wrought Iron 2/2000 Playground Equipment 9/2000 Surface, Playground 10/2000 Drinking Fountain Galvanized 3/2003 5' Black Iron Fence 11/2008 Playground Equipment Replacement 2/2020 ADA Access Improvements 2/2020 Campus Park Land, Park Site 5/1984 Land, Park Site 10/1987 Drinking Fountain 1/1988 Fence, Rear Perimeter 1/1988 Lights, 5 Steel Outdoor 1/1988 Page 135 of 144 139 Project Name/Item Description Date (Mo/Yr) Paving, Pavilion And Basketball Court 1/1988 Picnic Pavilion 1/1988 Sand Pit for Playground 1/1988 Restroom Building 1/1988 Playground Equipment 7/2001 Park Monument Sign (Concrete) 4/2003 Park Tables & Benches 4/2008 Lighting Upgrades 5/2014 Swing Structure Replacement 4/2020 College View Park Land, Park Site 5/1984 Drinking Fountains 1/1990 Fence, Chain Link 1/1990 Lights, 11 Steel Outdoor 1/1990 Paving, Concrete 1/1990 Picnic Pavilion 1/1990 Sand And Woodchip Pits for Playground 1/1990 Playground Structure 1/1990 Restroom Building 1/1990 Sign, Park 1/1990 Table, Picnic W/Benches (13 Total) 1/1990 Playground Equipment 8/1999 College View Park Monument 7/2003 Park Tables & Benches 7/2007 Security Lights (6) Install 6/2008 Basketball Court Lights 9/2009 Playground Equipment & Installation 6/2010 Dog Park Addition 9/2010 Bench, Concrete 6/2015 Community Center Park Perimeter Fence, Steel 1/1981* Page 136 of 144 140 Project Name/Item Description Date (Mo/Yr) Drinking Fountain 1/1988 Sand Pit For Playground 1/1998 Playground Structure & Swings 1/1998 Table, Picnic, w/ Benches (7) 1/1998 Drinking Fountain Galvanized 11/2002 Playground Structure 12/2002 Parking Lot Improvement 12/2015 Country Trail Park Land, Park Site 11/1995 Drinking Fountain 1/1997 Fence, Steel Bar & Stone 1/1997 Lights, 6 Steel Outdoor 1/1997 Paving, Asphalt 1/1997 Paving, Concrete 1/1997 Sand Pits For Playground 1/1997 Playground Structures (2), Equipment & Swings 1/1997 Sign, Park Concrete 1/1997 Table, Picnic W/Benches 1/1997 Playground Fence, Wrought Iron 5/2001 Irrigation Controller 8/2012 Playground Structure Repairs 9/2012 Concrete Park Benches (8) & Picnic Tables (8) 7/2013 Parking Lot Improvements 12/2015 Playground Equipment Replacement 10/2019 Sand Play Area Installation 10/2019 ADA Access Improvements 10/2019 Glenwood Park Land, Park Site 5/1984 Basketball Court & Pathways Paving 1/1994 Drinking Fountain 1/1994 Lights, 5 Steel Outdoor 1/1994 Page 137 of 144 141 Project Name/Item Description Date (Mo/Yr) Perimeter Fence, Chain Link 1/1994 Picnic Pavilion 1/1994 Sand Pits For Playground (3 Total) 1/1994 Playground Structures (2) & Swings 1/1994 Sign, Park Concrete 1/1994 Picnic Tables With Benches (6 Total) 1/1994 Playground Structure 6/2006 Concrete Park Tables 1/2009 Restroom Building 3/2011 Swing - 4 Seat 11/2013 Table, Picnic Concrete (2 Total) 6/2015 Playground Structure Replacement (Age 2-5) 3/2020 ADA Access Improvements 3/2020 Landscaped Parkway Waterscape - Tierra Rejada at Mountain Trail 2/2002 Signs Steeple Hill Entry 5/2003 Irrigation Controllers (38 Total) 8/2011 Irrigation Controller 4/2014 Spring Road/Ridgecrest Drive Landscape Renovation 10/2018 Magnolia Park Land, Park Site 6/2003 Land, Park Site 10/2003 Fence, Wrought Iron 10/2007 Park Benches and Tables 10/2007 Park Construction 10/2007 Playground Equipment & Swings 10/2007 Mammoth Highlands Park Land, Park Site 12/2005 Mammoth Art Bone Sculptures 7/2009 Park Construction 7/2009 Page 138 of 144 142 Project Name/Item Description Date (Mo/Yr) Irrigation Controllers 8/2011 Playground Equipment Replacement (Climber/Spinner) 1/2020 Miller Park Land, Park Site 6/2000 Land, Park Site 6/2000 Backstop 9/2000 Ball Field Bleacher, Aluminum 9/2000 Ball Field Fence, Chain Link 9/2000 Basketball Court Paving 9/2000 Drinking Fountain 9/2000 Lights, 14 Steel Outdoor 9/2000 Pavilion/Playground Fence, Steel 9/2000 Sand Pit For Playground 9/2000 Playground Structures (2) And Equipment 9/2000 Sign, Park W/Lights 9/2000 Soccer Goal 9/2000 Picnic Tables (17 Total) 9/2000 Tennis Court Fence, Chain Link 9/2000 Tennis Court With Lights 9/2000 Tennis Screen 9/2000 Picnic Pavilion 10/2000 Restroom Building 10/2000 Swing Sets 6/2008 Basketball Court Lights 9/2009 Install Concrete Fixtures (Replace Metal) 4/2012 Parking Lot Improvements 12/2015 Playground Equipment Replacement 3/2020 Sand Play Area Installation 3/2020 ADA Access Improvements 3/2020 Monte Vista Nature Park Land, Park Site 2/1990 Page 139 of 144 143 Project Name/Item Description Date (Mo/Yr) Drinking Fountain 1/1990 Paving, Asphalt 1/1990 Picnic Table With Benches (2 Total) 1/1990 Parking Lot Improvements 12/2015 Mountain Meadows Park Land, Park Site 3/1987 Backstops (2 Total) 1/1992 Ball Field Fence, Chain Link 1/1992 Bleacher, Aluminum 1/1992 Drinking Fountains (3 Total) 1/1992 Lights, 6 Steel Outdoor 1/1992 Paving, Asphalt 1/1992 Paving, Concrete 1/1992 Perimeter Fence, Chain Link 1/1992 Picnic Pavilion 1/1992 Playground Structures (2) & Swings 1/1992 Restroom Building 1/1992 Sign, Park 1/1992 Picnic Tables With Benches (12 Total) 1/1992 Park Monument Sign (Concrete) 3/2003 Playground Structure 6/2006 Park Tables & Benches 4/2008 Basketball Court Lights 9/2009 Ball Wall 5/2019 Open Space Open Space Land: Tierra Rejada Road 2/2011 North-East Open Space Property Purchase 9/2018 Peach Hill Park Land, Park Site 5/1984 Backstop 1/1992 Page 140 of 144 144 Project Name/Item Description Date (Mo/Yr) Ball Field Fence, Chain Link 1/1992 Ball Field Lights, 6 Steel Outdoor 1/1992 Basketball Court & Pathway Paving, Concrete 1/1992 Bleacher, Aluminum (2 Total) 1/1992 Lights 14 Steel Outdoor 1/1992 Parking Lot Paving, Asphalt 1/1992 Picnic Pavilion 1/1992 Sand/Wood Chip Pit For Playground 1/1992 Playground Fence, Wood Rail 1/1992 Restroom Building 1/1992 Picnic Tables With Benches (13 Total) 1/1992 Drinking Fountain 9/2000 Playground Structure & Swings 9/2000 Picnic Tables and Benches 8/2007 Playground Equipment & Installation 6/2010 Irrigation Controllers 8/2011 Playground Structure 2/2013 Parking Lot Improvement 12/2015 Softball Bleachers 6/2017 Sand Play Area Installation 4/2020 Poindexter Park Land, Park Site 12/1996 Backstops 1/1996 Bleacher, Aluminum (4 Total) 1/1996 Fence, Ball Field & Pavilion, Chain Link 1/1996 Fence, Brick/Steel Bar (between Park & Shops) 1/1996 Fence, Perimeter 1/1996 Drinking Fountain 1/1996 Flagpole 1/1996 Gazebos (2) 1/1996 Lights, 32 Steel Outdoor 1/1996 Page 141 of 144 145 Project Name/Item Description Date (Mo/Yr) Parking Lot Lights, 8 Steel Outdoor 1/1996 Pavilion Paving, Concrete 1/1996 Paving, Asphalt 1/1996 Picnic Pavilion 1/1996 Restroom Building 1/1996 Sign, Park Concrete/Stone with Lights 1/1996 Gazebo, Metal 8' Sides (2) 2/2002 Land, Park Site (For Expansion) 2/2004 Table, Picnic W/Benches 3/2006 Skate Park 12/2009 Lighting Upgrades (Led) 5/2014 Playground Equipment & Structures 4/2015 Parking Lot Improvements 12/2015 Drainage Improvements 4/2017 Tierra Rejada Park Land, Park Site 1/1992 Basketball And Tennis Court Paving, Concrete 1/1995 Paving, Asphalt 1/1995 Drinking Fountains (3 Total) 1/1995 Lights, 8 Steel Outdoor 1/1995 Perimeter Fence, Steel Bar & Stone 1/1995 Picnic Pavilion 1/1995 Sand Pits For Playground 1/1995 Restroom Building 1/1995 Picnic Tables With Benches (9 Total) 1/1995 Tennis Courts 1/1995 Sign, Park 1/1995 Screen, Tennis Court 4/2001 Interior Fence, Wrought Iron 6/2001 Playground Fence (Replacement) 9/2001 Park Monument Signs (Concrete) 3/2003 Page 142 of 144 146 Project Name/Item Description Date (Mo/Yr) Bocce Ball Court 3/2003 Storage Box 6/2004 Playground Structure And Equipment 6/2007 Park Tables & Benches 8/2007 Park Benches Concrete (11 Total) 7/2013 Bench, Cedar 10/2014 Park Bench, Concrete 2/2015 Pickleball Court 8/2017 Playground Equipment Replacement (Climbers) 9/2019 Veterans Memorial Park Land, Park Site 4/2001 Veterans Memorial Park Construction 5/2009 Villa Campesina Park Land, Park Site 8/1998 Lights, 8 Steel Outdoor 9/1996 Fence, Chain Link 9/1998 Drinking Fountain 4/2002 Park Monument Sign (Concrete) 4/2003 Playground Structure 4/2004 Playground Surfacing & Base 6/2004 Basketball Court Equipment 06/2004 Basketball Court Paving 06/2004 Grading, Trenching 06/2004 Sidewalk, Entry, & Steel Bollards 06/2004 Virginia Colony Park Land, Park Site 1/1996 Drinking Fountain 1/1988 Sand/Wood Chip Pit For Playground 1/1988 Playground Structure 1/1988 Sign, Park 1/1988 Page 143 of 144 147 Project Name/Item Description Date (Mo/Yr) Fence, Chain Link 9/1993 Drinking Fountain Galvanized 11/2002 Playground Structure 6/2006 Walnut Acres Park Land,161 Second Street 2/2011 Park Construction 10/2015 *Information on file for projects completed prior to city incorporation. Page 144 of 144 148