AGENDA REPORT 2023 0802 CCSA SPC ITEM 05A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
/ 1240
HomeMy WebLinkAboutAGENDA REPORT 2023 0802 CCSA SPC ITEM 05ACITY OF MOORPARK, CALIFORNIA City Council Meeting of August 2, 2023 ACTION APPROVED STAFF RECOMMENDATION, INCLUDING ADOPTION OF RESOLUTION NO. 2023- 4199. (ROLL CALL VOTE: UNANIMOUS) BY A. Hurtado. A. Consider Award of Agreement to Monet Construction, Inc. for City Hall Tenant Improvement Project; and Resolution Amending Fiscal Year (FY) 2023/24 Budget by Allocating $6,880,750 from the Special Projects Fund (3004) to Fund the Project; and Determination of Exemption Under the California Environmental Quality Act in Connection Therewith. Staff Recommendation: 1) Award bid to Monet Construction, Inc. for a total not-to-exceed contract value of $6,580,750, including contingency; and authorize City Manager to sign the Agreement, subject to final language approval of the City Manager; and Authorize City Manager to approve Change Orders up to the authorized contingency amount of $598,250; and 2) Adopt Resolution No. 2023-4199, amending FY 2023/24 budget by allocating $6,880,750 from the Special Projects Fund (3004) to fund the project. (Staff: Jessica Sandifer, Deputy Parks and Recreation Director) (ROLL CALL VOTE REQUIRED) Item: 5.A. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Jessica Sandifer, Deputy Parks and Recreation Director DATE: 08/02/2023 Special Meeting SUBJECT: Consider Award of Agreement to Monet Construction, Inc. for City Hall Tenant Improvement Project; and Resolution Amending Fiscal Year (FY) 2023/24 Budget by Allocating $6,880,750 from the Special Projects Fund (3004) to Fund the Project; and Determination of Exemption Under the California Environmental Quality Act in Connection Therewith BACKGROUND In October 2021, the City Council authorized the purchase of 323 Science Drive as the location for a new City Hall. Escrow closed in February 2022, and on February 16, 2022, the City Council approved an Agreement with SVA Architects, Inc. (SVA) for Architectural Design Services for the Tenant Improvements. SVA completed plans for a comprehensive tenant improvement project to reconfigure the building to provide enough office space to house all staff, create a new public counter and a new City Council chamber. On April 5, 2023, the City Council approved the plans and specifications and authorized staff to bid the project. DISCUSSION A notice inviting bids was published on June 11, 2023, and June 16, 2023. Two non- mandatory pre-bid site meetings were held on June 21, 2023, and June 27, 2023, and were attended by eighteen (18) contractors and sub-contractors. Six bids were received by the due date of July 21, 2023. The results are: Bidder Bid Amount McGillivray Construction, Inc. $6,308,000.00 Monet Construction, Inc. $5,888,000.00 Nationwide Contracting Services, Inc. $7,822,300.00 PreCon Industries $6,874,000.00 QuinCon, Inc. $6,404,406.00 Waisman Construction, Inc. $6,493,000.00 Item: 5.A. 1 Honorable City Council 08/02/2023 Special Meeting Page 2 The bids were evaluated on their completeness and cost. The apparent low bidder is Monet Construction, Inc. (Monet). Staff reviewed the bid package and conducted reference checks. Monet possesses the necessary qualifications, resources, and experience to perform the work. The bid package also included two additive items for parking lot slurry seal and landscape and irrigation improvements. The parking lot and landscaping at 323 Science Drive are in poor condition, however, this work scope was removed from the main bid scope and included as an additive bid item as a cost saving measure. Since the bid pricing is favorable, staff is recommending including these additive items in the bid to be completed now. The low bidder included pricing for these two additive items which will add $94,500 to the total project cost. With the addition of these items, the total project cost is $5,982,500. As a reminder, the estimated project cost with contingency was $7,370,000. The addition of these additive items is still below the estimated project cost. The project also includes a number of Owner Furnished Owner Installed (OFOI) items that will be completed by City staff or using separate contracts. First, the work to add the servers and associated infrastructure for access to the City’s network and the work to move the television broadcast system to the new City Hall is not included. These items are being installed separately by the City’s information technology (IT) staff and broadcast consultant. At this time the addition of network infrastructure and broadcast equipment to the building is estimated to cost $200,000. A portion of this work will be offset using Public, Educational, and Governmental (PEG) Access Fees, which are fees collected from cable service providers and can be used for equipping the City’s public broadcast station. Secondly, exterior monument signage and wayfinding signage will be designed and installed separately by a specialty sign contractor. This work is estimated to cost approximately $40,000. Third, the City’s contract intrusion detection and fire alarm company will need to install these systems throughout the new spaces in the building. This work is estimated to cost $40,000. Lastly, the services of a third-party Materials Testing and Special Inspection Consultant is also needed. The Building Code requires certain identified materials such as structural steel, epoxy, and structural concrete be tested and inspected to ensure they are installed correctly and meet certain standards outlined in the code. Staff is in the process of selecting a consultant for this work. Staff has included the costs for the IT Infrastructure, exterior signage and security and alarm systems in the budget amendment included with this staff report. Staff will return in the near future with an additional budget amendment for the costs for the Materials Testing and Special Inspection Consultant once a firm cost is known for that work scope. The project funds to be budgeted, including contingency and the OFOI items, will total $6,880,750. 2 Honorable City Council 08/02/2023 Special Meeting Page 3 ENVIRONMENTAL DETERMINATION The Community Development Director has reviewed this project and found it to be Categorically Exempt in accordance with Section 15301 (Class 1: Existing Facilities) of the CEQA Guidelines because the project is for a tenant improve project on an existing building with negligible expansion of use. Therefore, staff has determined that there is no substantial evidence that the project would have a significant effect on the environment. FISCAL IMPACT The total cost for the tenant improvement project is $5,982,500 including the additive items. Staff is recommending a ten percent (10%) contingency of $598,250 be added to the contract for a total not-to-exceed contract amount of $6,580,750. Staff is also requesting an additional $300,000 for the various OFOI items. Funds have not been budgeted for the Tenant Improvement project . A budget amendment is being requested in the amount of $6,880,750 from the Special Projects Fund (3004) for this work. The current balance in the Special Projects Fund is $28,216,979. After the budget amendment the balance will be $21,336,229. COUNCIL GOAL COMPLIANCE This action is consistent with City Council Goal 3, Objective 3.9: “New City Hall Tenant Improvements and Move”. STAFF RECOMMENDATION (ROLL CALL VOTE REQUIRED) 1. Award bid to Monet Construction, Inc. for a total not-to-exceed contract value of $6,580,750, including contingency; and authorize City Manager to sign the Agreement, subject to final language approval of the City Manager; and Authorize City Manager to approve Change Orders up to the authorized contingency amount of $598,250; and 2. Adopt Resolution No. 2023-____, amending FY 2023/24 budget by allocating $6,880,750 from the Special Projects Fund (3004) to fund the project. Attachment 1: Agreement – Monet Construction, Inc. Attachment 2: Draft Resolution No. 2023-____ 3 AGREEMENT BETWEEN THE CITY OF MOORPARK AND MONET CONSTRUCTION, INC. FOR CITY HALL TENANT IMPROVEMENT PROJECT AT 323 SCIENCE DRIVE THIS AGREEMENT, executed as of _________________________, between the City of Moorpark, a municipal corporation (“City”) and Monet Construction, Inc., a corporation (“Contractor”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: WHEREAS, City has the need for construction services related to City Hall tenant improvement project at 323 Science Drive; and WHEREAS, Contractor specializes in providing such services and has the proper work experience, certifications, and background to carry out the duties involved; and WHEREAS, on August 2, 2023, the City Council of the City of Moorpark authorized the City Manager to enter into this Agreement after public bidding in accordance with California Public Contract Code Section 22030, et seq. NOW, THEREFORE, in consideration of the mutual covenants, benefits , and premises herein stated, the parties hereto agree as follows: 1. TERM The term of the Agreement shall be from the date of execution until completion of the work identified in the Scope of Services and in conformance with Exhibit s C and D, unless this Agreement is terminated or suspended consistent with Section 6 of this Agreement. 2. SCOPE OF SERVICES City does hereby retain Contractor in a contractual capacity to provide construction services related to City Hall tenant improvement project, as set forth in Exhibit C: Contractor’s Bid Proposal, dated July 17, 2023, which exhibit is attached hereto and incorporated herein by this reference as though set forth in full and hereinafter referred to as the “Proposal” and as set forth in City of Moorpark Contract Documents for City Hall Tenant Improvement Project, ID # P&R-2023-01 attached hereto and incorporated herein by this reference as though set forth in full and hereinafter referred to as Exhibit D. Where said Scope of Services as set forth in Exhibits C and D, is modified by this Agreement, or in the event there is a conflict between the provisions of said Scope of Services and this Agreement, the language contained in this Agreement shall take precedence. Contractor shall perform the tasks described and set forth in Exhibit s C and D. Contractor shall complete the tasks according to the schedule of performance which is also set forth in Exhibit D. Compensation for the services to be performed by Contractor shall be in accordance with Exhibit C. Compensation shall not exceed the rates or total value of five ATTACHMENT 1 4 Monet Construction, Inc. Page 2 of 18 million nine hundred eighty-two thousand five hundred dollars ($5,982,500) as stated in Exhibit C, plus a 10% contingency of five hundred ninety-eight thousand two hundred fifty dollars ($598,250) for a total not-to-exceed contract value of six million five hundred eighty thousand seven hundred fifty dollars ($6,580,750) without a written amendment to the agreement executed by both parties. Payment by City to Contractor shall be as referred to in this Agreement. City and Contractor acknowledge that this project is a public work to which prevailing wages apply, and that a public work project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). Contractor agrees to comply with and be bound by all the terms, rules and regulations described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the DIR implementing such statutes, as though set forth in full herein, including any applicable amendments made thereto duri ng the term of this Agreement. For every subcontractor who will perform work on this project, Contractor shall be responsible for subcontractor’s compliance with (a) and (b) and Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor Code Section 1725.5 requires all contractors and subcontractors to annually register with the DIR before bidding or performing on any public work contract. 3. PERFORMANCE Contractor shall at all times faithfully, competently, and to the best of Contractor’s ability, experience, and talent, perform all tasks described herein. Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Contractor hereunder in meeting its obligations under this Agreement. 4. MANAGEMENT The individual directly responsible for Contractor’s overall performance of the Agreement provisions herein above set forth and to serve as principal liaison between City and Contractor shall be Richard Boctor, and no other individual may be substituted without the prior written approval of the City Manager. The City’s contact person in charge of administration of this Agreement, and to serve as principal liaison between Contractor and City, shall be the City Manager or the City Manager’s designee. 5. PAYMENT The City agrees to pay Contractor monthly, in accordance with the terms and the schedule of payment as set forth in Exhibit C, attached hereto and incorporated herein by this reference as though set forth in full, based upon actual time spent on the above tasks. This amount shall not exceed six million five hundred eighty thousand seven hundred fifty dollars ($6,580,750), which includes contingency of five hundred ninety-eight thousand two hundred fifty dollars ($598,250), for the total term of the Agreement unless 5 Monet Construction, Inc. Page 3 of 18 additional payment is approved as provided in this Agreement. Contractor shall not be compensated for any additional services rendered in connection with its performance of this Agreement, unless such additional services and compensation are authorized, in advance, in a written amendment to this Agreement executed by both parties. Contractor shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. If the City disputes any of Contractor’s fees it shall give written notice to Contractor within thirty (30) days of receipt of any disputed fees set forth on the invoice. Contractor shall provide appropriate documentation, as determined by the City, for all reimbursable expenses. 6. TERMINATION OR SUSPENSION WITHOUT CAUSE The City may at any time, for any reason, with or without cause, suspen d, or terminate this Agreement, or any portion hereof, by serving upon the Contractor at least ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. The Contractor may terminate this Agreement only by providing City with written notice no less than thirty (30) days in advance of such termination. In the event of such termination, Contractor shall be compensated for such services up to the date of termination. Such compensation for work in progress shall be prorated as to the percentage of progress completed at the date of termination. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, the City may proceed in the manner set forth in Section 6 -4 of the Greenbook. 7. DEFAULT OF CONTRACTOR The Contractor’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Contractor is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Contractor for any work performed after the date of default and can terminate this Agreement immediately by written notice to the Contractor. If such failure by the Contractor to make progress in the performance of work hereunder arises out of causes beyond the Contractor’s control, and without fault or negligence of the Contractor, it shall not be considered a default. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, he/she shall cause to be served upon the Contractor a written notice of the default. The 6 Monet Construction, Inc. Page 4 of 18 Contractor shall have five (5) working days after service upon it of said notice in which to cure the default by rendering a satisfactory performance. In the event that the Contractor fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. 8. LIQUIDATED DAMAGES If the Contractor fails to complete the work, or any portion thereof, within the time period required by this Agreement or as duly extended in writing by the City Manager, Contractor shall forfeit and pay to the City, as liquidated damages, the sum of one hundred twenty-five dollars ($125) per day for each calendar day the work, or portion thereof, remains uncompleted after the above specified completion date. Liquidated damages shall be deducted from any payments due or to become due to the Contractor under the terms of this Agreement [Government Code Sec. 53069.85]. Progress payments made by the City after the above specified completion date shall not constitute a waiver of liquidated damages by the City. 9. OWNERSHIP OF DOCUMENTS Contractor shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate t o the performance of services under this Agreement. Contractor shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted account ing principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the representatives of City or its designees at reasonable times to such books and records; shall give the City the right to examine and audit sa id books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activi ties related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of ten (10) years after receipt of final payment. Upon completion of, or in the event of termination or suspension of this Agreeme nt, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Contractor. With respect to computer files, Contractor shall make available to the City, at the Contractor’s office and upon reasonable written request by the City, the nec essary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files. 7 Monet Construction, Inc. Page 5 of 18 10. INDEMNIFICATION AND HOLD HARMLESS Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsels’ fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Contractor's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both City and Contractor, or should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsels fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the state of California and will survive termination of this Agreement. Contractor obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this agreement, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. In the event Contractor fails to obtain such indemnity obligations from others as required here, Contractor agrees to be fully responsible according to the terms of this Section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns, or heirs of Contractor and shall survive the termination of this Agreement or Section. 8 Monet Construction, Inc. Page 6 of 18 This Indemnity shall survive termination of the Agreement or Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other Contract Documents or Agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or apply any monies to the Contractor under this Agreement for the purpose of resolving such claim s; provided, however, City may release such funds if the Contractor provides City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in its sole discretion, determine whether such assurances are reasonable. 11. INSURANCE Contractor shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. 12. INDEPENDENT CONTRACTOR Contractor is and shall at all times remain as to the City a wholly independent Contractor. The personnel performing the services under this Agreement on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, or agents, except a s set forth in this Agreement. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Contractor shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner. No employee benefits shall be available to Contractor in connection with the performance of this Agreement. Except for the fees paid to Contractor as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Contractor for performing services hereunder for City. City shall not be liable for compensation or indemnification to Contractor for injury or sickness arising out of performing services hereunder. 13. LEGAL RESPONSIBILITIES The Contractor shall keep itself informed of local, state, and federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws and regulations, including but not limited to the Americans with Disabilities Act and Occupational Safety and Health Administration laws and regulations. The City and Contractor shall comply with Exhibit B, California Public Contract Code Section 9204, when applicable. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Contractor to comply with this Section. 9 Monet Construction, Inc. Page 7 of 18 14. ANTI DISCRIMINATION Neither the Contractor, nor any subcontractor under the Contractor, shall discriminate in employment of persons upon the work because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of such person; or any other basis protected by applicable federal, state, or local law, except as provided in Section 12940 of the Government Code. The Contractor shall have responsibility for compliance with this Section, if applicable [Labor Code Section 1735]. 15. UNDUE INFLUENCE Contractor declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of the City in connection with the award, terms, or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City will receive compensation, directly or indirectly from Contractor, or any o fficer, employee, or agent of Contractor, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a material breach of this Agreement entitling the City to any and all rem edies at law or in equity. 16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Project during his/her tenure or for one (1) year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Project performed under this Agreement. 17. CONFLICT OF INTEREST Contractor covenants that neither they nor any officer or principal of their firm have any interests, nor shall they acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of their services h ereunder. Contractor further covenants that in the performance of this Agreement, they shall employ no person having such interest as an officer, employee, agent, or sub contractor. Contractor further covenants that Contractor has not contracted with nor is performing any services directly or indirectly, with the developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, now or within the past one (1) year, and further covenants and agrees that Contractor and/or its subcontractors shall provide no service or enter into any contract with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, while under contract with the City and for a one (1) year time period following termination of this Agreement. 10 Monet Construction, Inc. Page 8 of 18 18. NOTICE Any notice to be given pursuant to this Agreement shall be in writing, and all such notices and any other document to be delivered shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the party for whom intended as follows: To: City Manager City of Moorpark 799 Moorpark Ave. Moorpark, CA 93021 To: Chief Executive Officer Monet Construction, Inc. 7610 Day Street Tujunga, CA 91042 Either party may, from time to time, by written notice to the other, designate a different address or contact person, which shall be substituted for the one above specified. Notices, payments and other documents shall be deemed delivered upon receipt by personal service or as of the third (3rd) day after deposit in the United States mail. 19. CHANGE IN NAME Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected in the Agreement documents. 20. ASSIGNMENT Contractor shall not assign this Agreement or any of the rights, duties , or obligations hereunder. It is understood and acknowledged by the parties that Contractor is uniquely qualified to perform the services provided for in this Agreement. 21. LICENSES At all times during the term of this Agreement, Contractor shall have in full force and effect, all licenses required of it by law for the performance of the services in this Agreement. 22. VENUE AND GOVERNING LAW This Agreement is made, entered into, and executed in Ventura County, California, and any action filed in any court or for arbitration for the interpretation, enforcement or other action of the terms, conditions, or covenants referred to herein shall be filed in the applicable court in Ventura County, California. The City and Contractor understand and agree that the laws of the state of California shall govern the rights, obligations, duties, 11 Monet Construction, Inc. Page 9 of 18 and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. 23. ENTIRE AGREEMENT This Agreement contains the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations, and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material. 24. CAPTIONS OR HEADINGS The captions and headings of the various Articles, Paragraphs, Sections, and Exhibits of this Agreement are for convenience and identification only and shall not be deemed to limit or define the content of the respective Articles, Paragraphs, Sections, and Exhibits hereof. 25. AMENDMENTS Any amendment, modification, or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by both parties to this Agreement. 26. TIME OF COMPLETION City and Contractor agree that time is of the essence in this Agreement. City and Contractor further agree that Contractor’s failure to perform on or at the times set forth in this Agreement will damage and injure City, but the extent of such damage and injury is difficult or speculative to ascertain. Consequently, City and Contractor agree that any failure to perform by Contractor at or within the times set forth h erein shall result in liquidated damages as defined in this Agreement for each and every day such performance is late. City and Contractor agree that such sum is reasonable and fair. Furthermore, City and Contractor agree that this Agreement is subject to Government Code Section 53069.85 and that each party hereto is familiar with and understands the obligations of said Section of the Government Code. 27. PRECEDENCE Contractor is bound by the contents of City’s Bid Package and Proposal, Exhibit D attached hereto and incorporated herein by this referen ce as though set forth in full. In the event of conflict, the requirements of the City’s Bid Package and this Agreement shall take precedence over those contained in the Proposal. 12 Monet Construction, Inc. Page 10 of 18 28. INTERPRETATION OF AGREEMENT Should interpretation of this Agreement, or any portion thereof, be necessary, it is deemed that this Agreement was prepared by the parties jointly and equally, and shall not be interpreted against either party on the ground that the party prepared the Agreement or caused it to be prepared. 29. WAIVER No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding unless executed in writing by the party making the waiver. 30. AUTHORITY TO EXECUTE The person or persons executing this Agreement on behalf of the Contractor warrants and represents that he/she has the authority to execute this Agreement on behalf of the Contractor and has the authority to bind Contractor to the performance of obligations hereunder. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK MONET CONSTRUCTION, INC. _____________________________ _______________________________ Troy Brown, City Manager Richard Boctor, Chief Executive Officer Attest: _____________________________ Ky Spangler, City Clerk 13 Monet Construction, Inc. Page 11 of 18 EXHIBIT A INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of the Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth here, it will be amended to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to City in excess of the limits and coverage required in this Agreement and which is applicable to a given loss, will be available to the City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Commercial General Liability Insurance shall be provided by an Insurance Services Office “Commercial General Liability” policy form CG 00 01 or t he exact equivalent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits shall be no less than $2,000,000 per occurrence for all covered losses and no less than $4,000,000 general aggregate. Contractor’s policy shall contain no endorsements limiting coverage beyond the basic policy coverage grant for any of the following: a. Explosion, collapse or underground hazard (XCU) b. Products and completed operations c. Pollution liability d. Contractual liability Coverage shall be applicable to City for injury to employees of contractors, subcontractors, or others involved in the project. Policy shall be endorsed to provide a separate limit applicable to this project. Workers’ Compensation Workers’ Compensation insurance shall be provided on a state -approved policy form providing statutory benefits as required by law with employers’ liability limits no less than $1,000,000 per accident for all covered losses. 14 Monet Construction, Inc. Page 12 of 18 Business Auto Coverage Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 06 92 including symbol 1 (Any Auto) or the exact equivalent shall be provided. Limits shall be no less than $1,000,000 per accident, combined single limit. If Contractor owns no vehicles, this requirement may be satisfied by a non -owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos in any way on this project, Contract or shall provide evidence of personal auto liability coverage for each such person. Excess or Umbrella Liability Excess or Umbrella Liability insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to City for injury to employees of contractor, subcontractors, or others involved in the Work. The scope of coverage provided is subject to the approval of city following receipt of proof of insurance as required herein. Limits are subject to review. Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the state of California and with A.M. Best rating of A - or better and a minimum financial size of VII. Contractor and City agrees as follows: 1. Contractor agrees to endorse the third party general liability coverage required herein to include as additional insureds City, its officials, employees, agents, using standard ISO endorsement No. CG 2010 and No. CG 2037 with edition acceptable to the City. Contractor also agrees to require all contractors, subcontractors, and any one else involved in any way with the project contemplated by this Agreement to do likewise. 2. Any waiver of subrogation express or implied on the part of the Cit y to any party involved in this Agreement or related documents applies only to the extent of insurance proceeds actually paid. City, having required that it be named as an additional insured to all insurance coverage required herein, expressly retains the right to subrogate against any party for sums not pai d by insurance. For its part, Contractor agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors, subcontractors, or others involved in any way with the project contemplated by this Agreement to do likewise. 3. All insurance coverage maintained or procured by Contractor or required of others by Contractor pursuant to this Agreement shall be endorsed to delete the subrogation condition as to the city, or to specifically allow Contractor or others providing insurance herein to waive subrogation prior to a loss. This endorsement 15 Monet Construction, Inc. Page 13 of 18 shall be obtained regardless of existing policy wording that may appear to allow such waivers. 4. It is agreed by Contractor and City that insurance provided pursuant to these requirements is not intended by any party to be limited to providing coverage for the vicarious liability of City, or to the supervisory role, if any, of City. All insurance coverage provided pursuant to this or any other Agreement (express or implied) in any way relating to City is intended to apply to the full extent of the policies involved. Nothing referred to here or contained in any agreement involving City in relation to the project contemplated by this Agreement is intended to be construed to limit the application of insurance coverage in any way. 5. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 6. All coverage types and limits required are subject to approval, modification, and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discover period) that may affect City’s protection without City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of binders of coverage, or endorsements, or certificates of insurance, shall be delivered to City at or prior to the execution of this Agreement. In the event such proof of insurance is not delivered as required, or in the event such insurance is canceled or reduced at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Agreement and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at City option. 8. Contractor agrees to endorse, and to required others to endorse, the insurance provided pursuant to these requirements, to require 30 days notice to Cit y and the appropriate tender prior to cancellation or reduction of such liability coverage and notice of any material alteration or non-renewal of any such coverage, and to require contractors, subcontractors, and any other party in any way involved with the project contemplated by this Agreement to do likewise. 9. It is acknowledged by the parties of this Agreement that all insurance coverage required to be provided by Contractor or any subcontractor, and any other party involved with the project who is brought onto or involved in the project by Contractor, is intended to apply first and on a primary non -contributing basis in relation to any other insurance or self insurance available to the City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to 16 Monet Construction, Inc. Page 14 of 18 monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Contractor agrees that upon request, all agreements with subcontractors and others engaged in this project will be submitted to City for review. 11. Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, architect, engineer, or other entity or person in any way involved in the performance of Work on the project contemplated by this Agreement to self-insure its obligations to City. If Contractor’s existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving the Contractor 90 days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to City. 13. For purposes of applying insurance coverage only, all contracts pertaining to the project will be deemed to be executed when finalized and any activity commences in furtherance of performance under this Agreement. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any insurance requirement in no way imposes any additional obligations on City no r does it waive any rights hereunder in this or any other regard. 15. Contractor will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any typ e pursuance to this Agreement. This obligation applies whether or not the Agreement is canceled or terminated for any reason. The insurance shall include but not be limited to products and completed operations and discontinued operations, where applicable. Termination of this obligation is not effective until City executes a written statement to that effect. 16. Contractor agrees to waive its statutory immunity under any workers’ compensation statute or similar statute, in relation to the City, and to require all subcontractors and any other person or entity involved in the project contemplated by this Agreement to do likewise. 17. Requirements of specific coverage features are not intended as limitations on other requirements or as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification 17 Monet Construction, Inc. Page 15 of 18 only as it pertains to a given issue, and is not intended by any party or insured to be all-inclusive. 18. Any provision in any of the construction documents dealing with the insurance coverage provided pursuant to these requirements, is subordinate to and superseded by the requirements contained herein. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties to be interpreted as such. 19. All liability coverage provided according to these requirements must be endorsed to provide a separate aggregate limit for the project that is the subject of this Agreement and evidencing products and completed operations coverage for not less than two years after issuance of a final certificate of occupancy by all appropriate government agencies or acceptance of the completed work by City. 20. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. 21. Contractor agrees to obtain and provide to City a copy of Professional Liabili ty coverage for Architects or Engineers on this project, when required by City. City shall determine the liability limit. 18 Monet Construction, Inc. Page 16 of 18 EXHIBIT B PUBLIC CONTRACT CODE SECTION 9204 9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section: (1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following: (i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. (v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority. (4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. 19 Monet Construction, Inc. Page 17 of 18 (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public en tity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45 -day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. 20 Monet Construction, Inc. Page 18 of 18 (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor wit hin the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days o f receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted b efore January 1, 2027, deletes or extends that date. (Amended by Stats. 2019, Ch. 489, Sec. 1. (AB 456) Effective January 1, 2020. Repealed as of January 1, 2027, by its own provisions.) 21 CHECKLIST FOR BIDDERS I The following information is required of all Bidders at the t ime of Bid submission / / Completed and Signed Bidders Checklist Sheet (This Sh7et) L _L_ _L Completed and Signed Bid Cover Form Completed and Signed Bid Sheets Completed and Signed Questionnaire Completed References Form \ 1 Resume of General Construction Superintendent/On-Site Construction Manager L Completed Subcontractor Designation Form L Completed and S igned Industria l Safety Record Form L_ Completed, Signed and Notarized Bid Bond or Other Security Fo rm L Signed Noncollusion Declaration Form .J_ Evidence satisfactory to the City indicating the capacity of the person(s) signing the Bid to bind the Bidder Failure of the Bidder to provide all required information in a complete and accurate manner may cause the Bid to be cons idered non-responsive. I hereby certify under penalty of perjury under the laws of the State of Cali fornia that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct. Name of Bidder Monet Construction, Inc . Signature I Name and Title Richard Boctor Dated 07/17/2023 Checklist-1 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc EXHIBIT C 22 BID CITY OF MOORPARK CITY HALL TENANT IMPROVEMENT PROJECT [PROJECT] TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF MOORPARK: The undersigned, as Bidder, declares that: (1) this Bid is made without collusion with any other person and that the only persons or parties interested as principals are those named herein; (2) the undersigned has carefu ll y examined the Contract Documents (including all Addenda) and the Project site; and (3) the undersigned has investigated and is satisfied as to the conditions to be encountered, the character, quality and quantities of Work to be performed, and the materials to be furnished. Furthermore, the undersigned agrees that submission of this Bid shall be conclusive evidence that such examination and investigation have been made and agrees, in the event the Contract be awarded to it, to execute the Contract with the City of Moorpark to perform the Project in accordance with the Contract Documents in the time and manner therein prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus and other means necessary so to do, except as may otherwise be furnished or provided under the terms of the Contract Documents, for the following stated unit prices or lump-sum price as submitted on the Bid herein. Bidder acknowledges receipt , understanding and full consideration of all addenda, as follows: Addendum No. ~------Date: 07/06/2023 Addendum No. _2 _____ _ Date: 07/17/2023 Addendum No. ______ _ Date: Addendum No. ______ _ Date: The undersigned submits as part of this Bid a completed copy of its Industrial Safety Record. This Safety Record includes all construction Work undertaken in California by the undersigned and any partnership, joint venture or corporation that any principal of the undersigned participated in as a principal or owner for the last five (5) calendar years a nd the current calendar year before the date of B id submittal. Separate information is being submitted for each such partnership, joint venture, or corporate or individual Bidder. The undersigned may attach any additiona l information or explan ation of data that it would like to be taken into consideration in evalu ating the Safety Record. An explanation of the circumstances surround ing any and all fatalities is attached. Accompanying this Bid is cash , a cashier's check , a certified check or a Bid Bond in an amount equal to at least ten percent (10%) of the total aggregate Bid price based on the quantities shown and the unit prices quoted. The undersigned further agrees that, should it be awarded the Contract and thereafter fail or refuse to execute the Contract and provide the required evidence of insurance and Bonds within fifteen (15) Days after delivery of the Contract to the undersigned, then the cash, check or Bid Bond shall be forfeited to the City to the extent permitted by law. The undersigned certifies to have a minimum of three (3) consecutive years of current experience in the type of Work related to the Project and that this experience is in actual operation of t he firm with permanent employees performing a part of the Work as distinct from a firm operating entirely B-1 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 23 by subcontracting all phases of the Work. The undersigned also certifies to be properly li censed by the State as a contractor to perform this type of Work. The undersigned possesses California Contractor's License Number 826930 , Class A&B , which expires on October 3 l, 2023 . Contractor a lso certifies that they are registered with the Department of Industrial Relations l00000487 I (DIR number) which expires on June 30 2026 Bidder's Name: Monet Construction Tnc. SignatureflO f-0 ¥ichard Boctor Signature: ______________ _ B-2 12853-0019\24 76738v1 .doc Title: President Date: 07/17/2023 Title: ____ _ Date: __ _ Richards, Watson & Gershon • 2020 24 CITY OF MOORPARK BID SHEETS FOR CITY HALL TENANT IMPROVEMENT [PROJECT] Bidder's Name: Monet Construction I nc. To the Honorable Mayor and Members of the City Council: In compliance with the Notice Inviting Bids, the undersigned hereby agrees to execute the Contract to furnish all labor, materials, equipment and supplies for the Project in accordance with the Contract Documents to the satisfaction and under the direction of the City, at the following prices: BASE AMOUNT: ITEM DESCRIPTION UNIT EXTENDED NO. AMOUNT 1. City Hall Tenant Improvement, per provided Plans LS $ 5,2i8,C>O? and Specifications dated 06112023 TOTAL BASE AMOUNT $ t;L@s ,(JO (J Y" ADDITIVE OR DEDUCTIVE ITEM (if applicable): ITEM NO. DESCRIPTION 1. Add Slurry Seal per Specification Section 01 23 00 2 . Add Landscape/Irrigation per Specification Section 01 23 00 and L series drawings TOTAL ADDITIVE OR DEDUCTIVE ITEM: UNIT LS LS EXTENDED AMOUNT $16CJO $ gt;,ooo Note: Items may be adjusted or deleted . Therefore, regardless of total actual volume (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be a llowed . The City reserves the right to not use any of the estimated quantities; and if this B-3 Richards, Watson & Gershon -2020 12853-0019\24 76738v1 .doc 25 right is exercised, the Contractor will not be entitled to any add itional compensation. Cost of all export and/or import of material shall be included in the above unit costs; no additional compensation will be granted for such expenses. TOTAL BASE BID PRICE IN DIGITS:$/ £g~(} ff{) TOTALBASEBIDPRICEINWORDS:$F,ve-,v<; /{,'oil -e ,rh+ kv~,J-e,~U'/~e<:rh+ TOTAL BID PRICE= BASE AMOUNT PLUS(+) ALL ADDITIVE ITEMS, MINUS(-) ALL DEDUCTIVE ITEMS ~~~ TOTAL BID PRICE IN DIGITS:$ *#J?:!:;lfo ,5;Cf&'C J ,;d () r~ _.A.A-1 '--Lf'\1'1\) /tllNt HtJ'hJ;i2_l;_P (=1 6,/fry ,w b TOTAL 8600 PRIC WORDS: r t vl= ft VrfJ::;,&t-~ l)b ~ --,z_~ Signatur : / j? 1/""> Title: President Date: 07/17/2023 . /~chard Boctor Signature-________________ Title:_____ Date: __ _ 8-4 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 26 QUESTIONNAIRE FORM Fill out all of the following information. Attach additional sheets if necessary. ( 1) Bidder's Name: Mon et Con st ructi o n, Inc. (2) If the Bidder's name is a fictitious name, who or what is the full name of the registered owner? If the Bidder's name is not a fictitious name, write "N/A" in the response to this question. If you are doing business under a fictitious name, provide a copy of the filed valid Fictitious Business Name Statement. (3) Business Address: 76 10 D ay St., Tujunga CA 9 I 042 (4) Telephone: 818-33 0-73 06 Facsimile: 8 18-33 0-73 08 (5) Type of Firm -Individual, Partnership, LLC or Corporation: ....;C=o=r..,_p=o1=·a=t io=n:.::,__ ____ _ (6) Corporation organized under the laws of the State of: _C_A _________ _ (7) California State Contractor's License Number and Class: _A.....C...&---'B'--------- Original Date Issued: ....;l~0~/3~1~/2~0~0=3 _________ Expiration Date: I 0/31/2023 (8) DIR Contractor Registration Number: _1-0~0~00-0-4_8_7_1 ___________ _ (9) List the name and title of the person(s) who inspected the Project site for your firm: Richard Boctor, Pre side nt (10) List the name and title of the person(s) who attended the non-mandatory pre-Bid meeting for your f irm , including the non-mandatory site visit (if any): NA (11) Number of years' experience the company has as a contractor in construction work: ..12_ (12) List the names, titles, addresses and telephone numbers of all ind ividuals, firm members, partners, joint venturers, and company or corporate officers having a principal interest in this Bid: Rich ard Bocto r Pres i dent 761 0 Day St Tujun g CA 9 I 04 2 818 -330-7306 (13) List all current and prior D.B.A.'s, aliases, and fictitious business names for any principal having interest in this Bid: NA B-5 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 27 (14) List the dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this Bid: NA ( 15) For all arbitrations, lawsuits, settlements and the li ke (in or out of court) that the company or any principal having an interest in this Bid has been involved with in the past five (5) years: a. List the names, addresses and telephone numbers of contact persons for the parties: NA b. Briefly summarize the parties' claims and defenses: c. State the tribunal (e.g., Superior Court, American Arbitration Association, etc.), the matter number, and the outcome: (16) Has the company or any principal having an interest in this Bid ever had a contract terminated by the owner or agency? If yes, explain. No Richa rds , Watson & Gershon -2020 12853-0019\24 76738v1 .doc 28 (17) Has the company or any principal having an interest in this Bid ever failed to complete a project? If yes, explain. No (18) Has the company or any principal having an interest in this Bid ever been terminated for cause, even if it was converted to a "termination of convenience"? If yes, explain. No (19) For projects that the company or any principal having an interest in this Bid has been involved w ith in the last five (5) years, did you have any claims or actions: a. By you against the owner? Circle one: b. By the owner against you? Circle one: Yes ~ Yes (® c. By any outside agency or individual for labor compliance? Circle one: Yes ~ d. By Subcontractors? Circle one: Yes (§) e. Are any of these claims or actions unresolved or outstanding? Circle one: Yes @) If your answer is "yes" to any part or parts of this question, explain. (20) List the last three (3) projects you have worked on or are currently working on for t he City of Moorpark: None B-7 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 29 Upon request of the City, the Bidder shall furnish ev idence showing a notarized financial statement, financial data, construction experience, or other additiona l information. Failure to provide truthful answers to the questions above or in the following References Form may result in the B id being deemed non-responsive. The Bidder certifies under penalty of perjury under the laws of the State of California that the information provided above is true and correct. Company Monet Construction, Inc. Signature: ___________ _ T itle: _____________ _ Date: -------------- 8-8 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 30 REFERENCES FORM F or fill public agency projects in excess of $5,000,000 that you are currently working on or have worked on in the past two (2) ye ars , provide the following information : Proj ect 1 Na me/Number LARSEN & PARKVTEW ES 122-23-04 & 22-23-05 Project Description HV AC, ELECTRICAL & FIRE ALARM UPGRADES From: 01 /10/2023 To: 04/30/2024 Approximate Construction Dates Agency Name: Hueneme ESD Contact Person : David Ragsdale Telephone: 805-488-3588 Address: BAFLOUR BEATTY, 300 E. ESPLANADE DRIVE, #1120, OXNARD, CA 93036 Original Contract Amount: $_7..,___17--'-0 ....... 3--'-l....;;..0 ____ Final Contract Amount: $ 7,170 310 If final amount is different from original amount, please explain (change orders, extra work, etc.). Did you or any Subcontractor, file any claims against the Agency? C irc le one: Yes (&v Did the Agency file any cla ims against you? Circle one: Yes @ If you answered yes to e ither of the above two questions, please explain and indicate outcome of c laims. NA Project 2 Name/Number C. BLA CKSTOCK JHS ! 22-23-03-C Project Description HV AC, FIRE ALARM, AND ELECTRICAL UPGRADES Approximate Constru ction Date Agency Name: Hueneme ESD Contact Person: David Ragsdale From: I l /28/2022 To: Q9/J Q/2023 Telephone: 805-488-3588 Address: BAFLOUR BEATTY, 300 E . ESPLANADE DRIVE, #1120 , OXNARD, CA 93036 Origin al Contract Amount: $ 4 389 000 Final Contract Amount: $ 4 389 000 B-9 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 31 If final amount is different from original amount, please explain (change orders, extra work, etc.). NA Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes (fIQ) Did the Agency file any claims against you? Circle one: Yes @ If you answered yes to e ither of the above two questions, please explain and indicate outcome of claims. NA Project 3 Name/Number PALM CREST E.S. MODERNlZATION I BlD NO. LCF 20/21-7 Project Description SEISMIC REINFORCING AND TENANT I MPROVE M E NTS Approximate Construction Dates Agency Name: La Canada USO From: 07/22/2022 To: 12/28/2023 Contact Person: _F_r_an_k_N_av_a_n_·o ______ Telephone: 818-952-8077 Address: LINIK CORP PO BOX 803040 SANT A CLARJT A Original Contract Amount: $_6..._,6_8_4..._,0_0_0 ____ Final Contract Amount: $6,684,000 If f inal amount is d ifferent from original amount, please explain (change orders, extra work, etc.). NA Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes @ Did the Agency file any claims against you? Circle one: Yes If you answered yes to either of the above two questions, please explain and indicate outcome of claims. B-10 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 32 Project 4 Name/Numbe r 202 I-2022-05 HUENEME ES & 2021-2022-06 SUNKIST ES Proje ct Description HV AC, ELECTRJCAL AND FIRE ALARM UPGRADES Approximate Construction Dates Agency Name: Hueneme ESD Contact Person : DENNIS KUYKENDALL From: 0 3/21/2022 To: 08/30/2023 Telephone: 805-983-1558 Address: BAFLOUR BEATTY , 300 E, ESPLANADE DRIVE, #I 120, OXNARD , CA 93036 Original Contract Amount: $_6~7_0_7~1_2_8 ____ Final Contract Amount:$ 7,237 ,500 If final amount is different from original amount. please explain (change orders, extra work, etc.). Change Orders per Owner Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes @ Did the Agency file any claims against you? Circle one: Yes If you answered yes to e ither of the above two questions, please explain and indicate outcome of claims. NA Proj ect 5 Name/Number MANHATTAN BEACH FS #2 I PROJE CT NO . D-939 Project Description NEW CONSTRUCTION OF FIRE STATION Approximate Construction Dates From: 11/01/2021 To: 04/12/2023 Agency Name: CITY OF MANHATTAN BEACH, PUBLIC WORKS Contact Person: LIANA URRUTIA Telephone: 3 10-802-5353 Address: 1400 HIGHLAND AVE., MANHATTAN BEACH , CA 90266 Original Contract Amount: $_7~·=05~5~,0~0~0 ____ Final Contract Amount: $7,235.993 If final amount is different from original amount. please explain (change orders, extra work, etc.). Change Order per Owner B-11 R ichards, Watson & Gershon -2020 12853-001912476738v1 .doc 33 Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes ~ Did the Agency file any claims against you? Circle one : Yes ®) If you answered yes to either of the above two questions, please explain and indicate outcome of claims. NA Project 6 Name/Number FIRE STATION #2 & 4 I ClP NO.s J 9-37-02 & 19-37-04 Project Description MODERNIZATION & EXPANSION PROJECT Approximate Construction Dates From: 09/09/2020 To: 09/25/2021 Agency Name: CITY OF DOWNEY Contact Person: _W_A_L_T_E_D_E_N ______ Telephone: 949-874-9170 Address: 11111 BROOKSHIRE AVE, DOWNEY. CA 90241 Original Contract Amount: $~5-,7~4~4~,0~0_0 ____ Final Contract Amount:$ 5,956.945 If final amount is different from original amount, please explain (change orders , extra work, etc.). Change Orders per Owner Did you or any Subcontractor, file any claims aga inst the Agency? Circle one : Yes @ Did the Agency file any claims against you? Circle one: Yes If you answered yes to e ither of the above two questions, please explain and indicate outcome of claims. NA RESUME Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Project. B-12 Richards, Watson & GershOn -2020 12853-0019\2476738v1 .doc 34 Joe Schahaf Project Superintendent Contact Mobile: (310) 945-8634 Email: joe@monetinc.net License General Contractor State License (B), License Number: 866552 Date Received:2005 OSHA Construction Certified-30 hours Cal/OSHA Certified-10 hours CPR Certified Key Skills Analyzing & Assessing Blueprints Safety & Risk Management Scheduled Product Delivery Quality Assurance & Control Strategy & Manpower Planning Coordinating Trades Scheduling & Coordinating Subcontractors Productivity, Efficiency & Performance Problem Identification & Resolution Objective Quality-oriented and results driven professional with 28 years of vast experience working as a Project Superintendent for the Public Works Construction Project Sites. Successfully managed over 20 large projects including LA and Ventura county projects, schools, and libraries ranging in value from $1 million to multi-million dollar assignments with a high level of accountability, professional ethics, and dedication. Effectively maintain positive relationships with subcontractors and government agencies to ensure each project is completed on schedule, on budget. Experience Oct 2021-Present Superintendent• Monet Construction,lnc. 2020-2021 Supervisor • Morillo Construction 2018-2020 Responsible Manager Owner• Power Synergies Inc 1991-2019 Superintendent and Estimator• G2K Construction,lnc • Monitor projects from planning to completion, including tasks such as budgeting and scheduling. • Follow quality standards and ensure the safety and security of the construction site. • Collaborate with engineers, subcontractors, etc. to determine project needs • Set performance goals and deadlines • Plan construction processes • Estimate costs and ensure the project is on budget • Supervise staff and provide constructive feedback • Monitor and report on project progress 35 LIST OF PROJECTS AS PRO,JECT SUPERINTENDENT 2022-2023(Present) Larsen & Parkview Es Hvac, Electrical & Fire Alarm Upgrades$ 7,170,310.00 Hueneme Elementary School District Dennis Kuykendall (805)983-1558 2021-2022 Mesa Union Es -Window Replacements, Hvac And Electrical Upgrades $3,578,000 Mesa Union School District Orlando De Leon (805) 383-9315 2021-2022 Fillmore Library Expansion $2,298,045.79 County Of Ventura Public Works Agency Devi Nallamala (805) 658-4354 2020-2021 Mental Health Center LAUSD Under OSHPD $9,000,000 Matthew Blane LAUSD Owner Representative (213) 663-9355 2017-2018 Lincoln Park Pool&Bath House City Project Manager $7,600,000 City Of LA-Dept. of Parks&Recreation Ingrid Reyes 213-847-4805 2014-2016 Mckinley Elementary Campus. City Project Inspector $5,182,000 San Gabriel Unified School District Victor Curiel 213-798-5644 2013-2015 Hamilton Elementary School AOR:LPA, Inc. $2,311,900 Pasadena Unified School District Randy Gamache 949-599-6516 2011-2012 Jefferson Middle School Sports&Fitness AOR:Flewelling&M oody $3,790,000 San Gabriel Unified School District. Sam Sahand 3230542-8300 2010-2012 Builing I Bookstore Renovation CM Cordoba Corporation $2,160,097 Long Beach Community College District Lisa Hernandez 562-938-5068 2008-2009 LAHC-New Child Development Center AOR:PBWS $7,270,000 Los Angeles Community College LACCD Jennifer Maclssac 626-432-5000 2008 Sky Blue Mesa Elementary School AOR:CarMichael Kemp. $4,899,000 Saugus Elementary Syrus Mobyen 626-357-9880 36 DESIGNATION OF SUBCONTRACTORS [Public Contract Code Section 4104] List all Subcontractors who will perform Work or labor or re nder service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications , in an amount i n excess of one-half percent (0.5%) of the Contractor's total Bid or, in the case of bids o r offers for the construction of street s or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total Bid or $10 ,000, whiche ver is greater. If a ll Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors. Name under which Subcontractor is Licensed and Re istered CSLB License Number{s) and Class(es) DIR Contractor Registration Number Address and Phone Number Type of Work (e.g., Electrical) Percentage of Total Bid (e.g., 10%)" · The perc entage of the total Bid shall represent the "portion of the work" for the purposes of Public Contract Code Section 4104 (b ). B-13 Richards, W atson & G ershon -2020 1285~1912476738v1 .doc 37 j!/J DESIGNATION OF SUBCONTRACTORS [Public Contrac t Code Section 4104] List all Subcontractors who will perform Work or labor or rend er service to the Contractor in or about the construction of the Work or improve ment, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement accord ing to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor's total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total B id or $10 ,000, whicheve r is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors. Name under wh ich CSLB License DIR Contractor Type of Work Percentage of Total Subcontractor is Number(s ) and Registration Address and Phone Numbe r Licensed Class(es) Number (e.g., Electrical) Bid (e.g ., 10%)" and Registered -~? 7 001"Utfh ft, Vl ~JI.IA fnl NT I N7 I IV Tl'~ ~ C' .,J~,11~ II-/. O CA-4.c( ~t,./# IGt/<( OfJOOOb ~q((J -,rr /Y. 4N1Ef<!~.4 ,,[.,[ v 6/ltl ,d-, c,4. f ~ ·r I i""'~E'~ I z. ft},?,?D()OO /(}67t:, I/~;£ )f~L---?AaJIAI/ crl 75~/ I /CtJ/4 ?A~MvtR. Cl $v/l/L..A-N(> (A-l.<ff GVfAf~~t6/II 2 . (p · The percentage of the total Bid sha ll represent the "portion of the work" for the purposes of Public Contract Code Section 4104(b). B-13 Richards. W atson & Gershon -2020 12853-0019\24 76738v1 .doc 38 DESIGNATION OF SUBCONTRACTORS [Public Contract Code Section 4104] List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, speci ally fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications , i n an amount in excess of one-half percent (0.5%) of the Contractor's total Bid or, in the case of bi ds or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page li sting all information for all other Subcontractors. Name under which CSLB license DIR Contractor Type of Work Percentage of Total Subcontractor is Number(s) and Registration Address and Phone Number (e.g., Electrical) Bid (e.g., 10%)" licensed Class (es) Number and Registered -,-~v~N P1E.l-D ~%l loocoz.1t;13 .fl, 5Cf77 tJtp co«e J " AP (o ~VABtNC., 1.. I. <_ I ,A/ r wD f//<, l/ 17 ;f lt,k-, 4,,t- t7r1'3~ I ~~I' /tJ '/7f t'J.'I I/~-~ 1,;y,. wrrr-r1:7r. V~7A ~ /0--:J;, 711 Mt.t.fw,11[) cA r~'fi,N> I ~ ttloOQO{'f/tlQ -rcs,.-~ ~ fl.,P -z_ L- 9-1 /C?-- tt?o 10¢0o9Sr9 ~5 7 .-z_. tbq t./. 5°.-rN ~.lf,R,171,ifO ~l--It Cc?V-/A/A- · The percentage of the total Bid shall represent the "portion of the work» for the purposes of Public Contract Code Section 4104(b ). B-13 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc / 39 DESIGNATION OF SUBCONTRACTORS [Public Contract Code Section 4104] List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications , in an amount in excess of one-half percent (0.5%) of the Contractor's total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total Bid or $10,000, whichever is greater. If a ll Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors. Name under which CSLB License DIR Contractor Type of Work Percentage of Total Subcontractor is Number(s) and Reg istration Address and Phone Numbe r (e.g., Electrical) Bid (e.g., 10%)" Licensed Class(es) Number and Registered g/0 ( '1';::? Yr>1t 171/ f: ~ 3J-( C.,4$f'< t9~ '('G3Rfq oa-6~1/~L f!VAC t~ fl t,v 11 (7 /V7 I. '() ~Vl/!P c?Ai-r.;1~o ,M.£ ?-c · The percentage of the total Bid shall represent the "portion of the work~ for the purposes of Public Contract Code Section 4104 (b). 8 -13 R ichards. Watson & Gershon -2020 12853-0019\24 76738v1 .doc 40 INDUSTRIAL SAFETY RECORD FORM Bidder's Name Manet Caostmctiao_ Toe Current Year of 2022 2021 2020 201 9 2018 Total Record Number of contracts 4 5 12 6 9 8 44 Total dollar amount of contracts (in thousands of dollars) 7 ,3 13,91 l 26,705,616 25 .790,033 9,460,344 17,709,164 13,434,067 100,413.135 N umber of fatalities 0 0 0 0 0 0 0 Number of lost workday cases 0 116 0 0 0 97 2 13 Number of lost workday cases involving permanent · transfer to another j ob or termination of employment 0 0 0 0 0 0 0 The above information was compiled from the records that are avai lable to m e at th is t ime and I declar e under penalty of perjury und er the laws of the State of California that the information is t rue and accurate with in t he li m itations of those records. Signat urefO /S ,;:=:- T itle: Pr~ideot ' Date: Q7fl 7/?Q23 S i gnatur e : ___________________ _ T it l e : ____________________ _ Date: ____________________ _ B-14 Richards , W atson & Gershon -2020 1 2853-001 9\24 7 6738v1 .doc 41 BID BOND KNOW ALL PERSONS BY THESE PRESENTS that: Bond No . ..;..N"-'-/A...;.__ __ WHEREAS the City of Moorpark ("City"), has issued an invitation for Bids for the Work described as follows: City Hall Tenant Improvement Project at 323 Science Drive, Moorpark, CA 93021._ WHEREAS MONET CONSTRUCTION, INC. -7610 DAY STREET TUJUNGA, CA 91042 (Name and address of Bidder) ("Principal"), desires to submit a Bid to City for the Work. WHEREAS, Bidders are required to furnish a form of Bidder's security with their Bids. NOW, THEREFORE, we, the undersigned Principal, and _____________ _ GREAT AMERICAN INSURANCE COMPANY -750 THE CITY DRIVE SOUTH #470 ORANGE, CA 92868 (Name and address of Surety) ("Surety"), a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of TEN PERCENT OF AMOUNT BID Dollars($ 10% , being not less than ten percent (10%) of the total Bid price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal is awarded the Contract for the Work by the City and, within the time and in the manner required by the bidding specifications, enters into the written form of Contract included with the bidding specifications, furnishes the required Bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials), and furnishes the required insurance coverage, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect. In case suit is brought upon this instrument, Surety further agrees to pay all court costs incurred by the City in the suit and reasonable attorneys' fees in an amount fixed by the court. Surety hereby waives the provisions of Civil Code Section 2845. B-15 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 42 IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly s igned by its undersigned representative(s) pursuant to authority of its governing body. Dated: JULY 14TH, 2023 "Principal" "Surety" MONET CONSTRUCTION, IN C. GREAT AMERICAN INSURANCE COMPANY By: Its: _A_TT_O_--="--------- By: ___________ By: Its: _____________ Its: Nole: This Bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. B-16 Richards , Watson & Gershon -2020 12853-001912476738v1 .doc 43 GREAT AMERICAN INSURANCE COMPANY® Administrative Office: 301 E 4TH STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740 The number of persons authorized by this power of attorney is not more than FOUR No. 0 20974 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY, a corporation organized and existing under and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than one is named, its true and lawful attorney-in-fact, for it and in its name, place and stead to execute on behalfofthe said Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. PHILIP E. VEGA KEVIN VEGA BRITTON CHRISTIANSEN MYRNA F. SMITH Name Address ALL OF COVINA, CALIFORNIA Limit of Power ALL $100,000,000 This Power of Attorney revokes all previous powers issued on behalf of the attomey(s)-in-fact named above. IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 9TH day of FEBRUARY 2021 """ 4-c e. :E_ GREATAMERICA"}i/;i//ilv As.ristcmt Secretwy Divisional Senior nee President STATE OF OHIO, COUNTY OF HAMILTON -ss: MARK VICARIO (877-377-2405) On this 9TH day of FEBRUARY , 2021 , before me personally appeared MARK VICARIO, to me known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond Division of Great American Insurance Company, the Company described in and which executed the above instrument; that he knows the seal of the said Company; that the seal affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name thereto by like authority. SUSAN A KOHORST Notary Public State of Ohio My Comm. Expire<; May 18, 202.5 This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company by unanimous written consent dated June 9, 2008. RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents, Divisional Vice Presidents and Divisonal Assistant Vice Presidents, or any one of them. be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact to execute on behalf of the Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof-to prescribe their respective duties and the respective limits of their authority; and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any poll'er of attorney or certificate of either given for the execution of any bond, undertaking, contract of suretyship, or other written obligation in the nature thereof. such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of June 9, 2008 have not been revoked and are now in full force and effect. Signed and sealed this 14th day of July 2023 Assistant S<!cretary S 1029AH (03/20) 44 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT C IV I L CODE§ 1189 A notary public or other oflicer comp leting this certificate verifies only the identity of the individual who signed the document to whic h this certificate is attached , and not the truthfulness, accuracy, or validity of that document. State of Cal ifornia County of LOS ANGELES On 07/14/2023 before me, PHILIP VEGA , NOTARY PUBLIC Date Here Insert Name and Title of the Officer personally appeared KEVIN VEGA, ATTORNEY-in -FACT Name(s) of Signer(s) who proved to me on the basis of satisfactory ev idence to be the person'(-sl_ whose name~ is/are subscribed to the w ithin instrument and acknowledged to me that he/~/fhsy executed the same in his/hm/thsir authorized capacity(tes~ and that by his/her-Mleii: s ignature~ on the instrument the person~t or the entity upon behalf of which the person~ acted , executed the instrument. PHILIP VEGA Notary Public -California Los Angeles County I Commission II 2327592 My Comm. Expires May 31 , 2024 Place Notary Seal Above I certify under PENAL TY OF PERJURY under the laws of the State of Californ ia that the forego ing paragraph is true and correct. WITNESS my hand and official seal. Signatur ----------------OPTIONAL---------------- Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Descr ipti on of Attached Document Titl e or Type of Document: _____________ Document Date: _______ _ Number of Pages: Signer(s) Other Than Named Above: ____________ _ Capacity(ies) C la imed by S igner(s) Signer's Name: ____________ _ Si gner's Name: ____________ _ D Corporate Officer -Title(s): ______ _ D Corporate Officer -T itle(s): ______ _ D Partner -D Lim ited D General D Partner -D Lim ited D General D Individual □ Attorney in Fact D Individual □ Attorney in Fact D Trustee D Guardian or Conservator D Trustee □ Guardian or Conservator D Other: ______________ _ □ Other: _____________ _ Signer Is Representing: _________ _ Signer Is Representing: _________ _ ©2014 National Notary Assoc iation· www.Nationa lNotary.org · 1-800-US NOTARY {1-800-876-6827) Item #5907 45 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles On 07/17/2023 before me Jenny Altagracia Martinez, Notary Public '------------------- (insert name and title of t he officer) personally appeared _R_._1c_h_a_rd_B_o_ct_o_r_-_--_--_-_--_--_-_--_-_--_--_-_--_--_-_--_-_--_--_-_--_-_--_--_-_--_--_-_--_-_--_--_-_--_-_--__ _ who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENAL TY OF PERJURY under the laws of the State of California t hat the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signatu re~ (Seal) eeeeeeeef JENNY ALTAGRACIA MARTINE'Z Notary Publlc • California : Los Angeles County s: Commlsslon # 2412944 - y Comm. Expires Sep 11, 2026 46 NONCOLLUSION DECLARATION FORM TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID [Public Contract Code Section 7106] The undersigned declares: I am the Pres i dent Bid. of Monet Construction, Inc ., the party making the foregoing The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The B id is genuine and not co llusive or sham. The B idder has not directly or indirectly induced or sol icited any other Bidder to put in a false or sham Bid. The Bidder has not directly or indirectly co lluded , conspired, connived, or agreed with any Bidder or an yone else to put in a sham Bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid price of the Bidder or any other B idder, or to fix any overhead, profit, or cost e lem ent of the Bid price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, Bid depository, or to any member or agent thereof, to effectuate a collusive or sham Bid, and has not paid, and will not pay, any Person or entity for such purpose. Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, lim ited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 07/17/2023 [date], at Tujunga [city], CA [state]. Signature: Signature: Printed Name: ·chard Boctor Printed Name: __________ _ Date: 07/17/20 23 -----------Date: B-17 Richards, Watson & Gershon -2020 12853-0019\2476738v1 .doc 47 - ~ Cons truction • Development • Man agement MINUTES OF SPEC IAL MEETIN G OF DIRECTORS OF MO NETCONSTRU CTION, I NC. A Ca lifornia CORPORATION The Directors of M onet Construction, Inc. having consented to the time and place of the special Meeting held on February 05, 2022 at 10:30 a .m. at: 7610 Day St., Tujunga CA 91042 Duri ng the meeting it was resolved that t he President of the Corporation Richard Boctor will continue to be authorized to enter into constr uction contracts with various public agencies and to bind the Corporat ion to t hose contracts. There being no further business brought before the meeting and motion was made to adjourn. Dated: February 05, 2022 Name Title Richard Boctor Director MONET CONSTR UCTI ON, I NC. 7610 Day Street, Tujunga, CA 91042 Lie. #826930 (818) 330-7306 FAX (818) 330-7308 48 July 6, 2023 CITY OF MOORPARK PARKS, RECREATION & COMMUNITY SERVICES DEPT. I 799 Moorpark Avenue, Moorpark, CA 93021 Main City Phone Number (805) 517-6200 I Fax (805) 532-2550 I moorpark@moorparkca.gov ADDENDUM NO. 1 TENANT IMPROVEMENTS 323 SCIENCE DRIVE Identification No. P&R-2023-01 NOTICE IS HEREBY GIVEN to all bidders and plan holders that the plans and specifications for the above described project are hereby amended I clarified as follows: CLARIFICATIONS: • Building permit is ready to be pulled by the selected Contractor. Selected contractor will be responsible for complying with Construction & Demolition Management Plan requirements. • Mold Remediation and Asbestos Report -attached (Appendix 1 ). • Construction timing: General Construction timing is 8 months, however, City will coordinate with Contractor on long lead time items and adjust timing as appropriate. • Fire Alarm/ Intrusion Detection I Surveillance/ Access-There have been several questions requesting clarification of the scope for the Fire Alarm/Intrusion Detection/ Access Cards/ Surveillance system. This is intended to answer all of those questions. The City's Fire Detection/Intrusion monitoring contractor will be providing the fire detection system and the intrusion detection system. The GC will be responsible for procurement and installation of the fire sprinkler switches for monitoring, which is standard. The CG is also responsible for procurement and installation of the required duct detectors and dampers for the HVAC system, which is also standard. In addition to these, the GC would be responsible for providing an electrical outlet on a dedicated circuit for the fire detection control panel and power supplies, and an outlet for the intrusion detection system and power supply. Lastly, the City Fire Detection/Intrusion monitoring contractor will also remove the existing fire alarm and intrusion detection equipment prior to demo which will need to be coordinated with the GC. No conduit is needed for the fire alarm or intrusion detection. All wire will be run above the ceiling by the City's monitoring contractor. The security system has three components as follows: Intrusion Detection -procured and installed by City Security monitoring company (includes motion sensors, door breaks, glass breaks, monitoring panel etc.) Electronic Access Control -purchased and installed by General Contractor per plans, programmed/controlled by City Video Surveillance -purchased and installed by General Contractor per plans. CHRIS R. ENEGREN Mayor RENEE DELGADO Councilmember DANIEL GROFF Councilmember TOM MEANS Councilmember DR. ANTONIO CASTRO Councilmember 49 Addendum #1 July 6, 2023 Page 2 Division 27 and Division 28 apply to this scope. Division 27 is by the General Contractor. Division 28 scope for the access control and video surveillance are part of the General Contractors scope of work, while the Division 28 Intrusion and fire alarm fall under the City monitoring contractor scope. • Re-Roofing -The project is a re-roof per the plan set • As-Builts -The City does not have as-built plans. We have the plans provided for the building permit when the building was constructed. If desired, we can make those available. • Confirming that the City is requesting installation of Solatubes as per the plans • General Contractor responsible for removal and disposal of all cubicles, furniture and other debris in the building, not slated for reuse on the plans. • City will have vines removed from exterior of the building. However, General Contractor will still need to prep walls for paint. • Door reuse/finish -Door finishes are per comments 9 and 10 where the alternate color is applied. All other doors are existing to remain, existing to be relocated (same door, same finish), or new with cherry finish to match existing. See specification section 08 14 00 2.2 B 1 a 1 and 2. ------ MG3 is solid wood, stained, per door schedule. The color is not indicated so that can be clarified as white oak veneer with wheat stain WH18 to match PL-2. • Door schedule -G/N restroom: The door tag is missing on the plan at the GIN restroom. That door is #238 on the schedule which is HW Group 18. (HW Group refers to 130A) • First Floor Breakroom Scope is minimal, renovations as noted on the plan set • Wall Paper Removal and Replacement -Wall paper is only being added in limited areas noted on the plans, the existing wallpaper throughout is being removed and prepped for painting. • 50% Self-performance Requirement -City will modify the self-performance requirement to 25% self-performance of the contract documents. QUESTIONS: Q1. On T0.1 Telecomm Coversheet, there are AV markings with a# symbol. Are these locations receiving the same Cat6A cable we would be providing to the data ports? A 1 /MEG: Symbol subscript indicates device type (e.g., A V1, AV2). Refer to Technology Equipment Schedule on TO. 2. 50 Addendum #1 July 6, 2023 Page 3 Q2. On sheets T3.1 and T3.2 there are "WP#" symbols, which is not a type of symbol covered by the coversheet. Please clarify. A2 /MEG: WP# is a subscript of the below symbol (e.g., AV-WP1-W, AV-WP2-W). Refer to Technology Equipment Schedule on T0.2. Q3. On T0.1 Coversheet, there are locations marked as "RI Rough In". Is there a note that explains what this is meant to be? If not, please clarify. A3 /MEG: "Rough In' is used in locations needing to transition from wall box to modular furniture or casework. Reference keynotes on floorplans and coordinate with appropriate trades onsite to provide an acceptable transition. Rough in detail below provides typical rough in for modular furniture connection. This detail does not relieve the contractor of responsibility to coordinate with other trades for acceptable transition. Q4. On the 6/21 walk, there was mention that there might be existing As-Builts for the telecom. Can these be provided? A4 There are no as-built plans for the telecom system. Q5. On sheets T1 .1, T3.1 , and T3.2 there are camera location markings without a data cable count. Please provide quantities for these locations A5 /MEG: Provide two (2) CAT 6A cables to each camera location. REFER TO FlOOR PLANS FOR WALL LOCATION ::i !: ,.,,.--~CD ::...----,, ,, ,, ,, ,, ,, ,, :: # !!~HNOLOGYFURNITUREFEED T 136 01 ==CD I. DEDICATED 1 5" EMT CONDUIT STUBBED TO ABOVE ACCESSIBLE CEILING 2. DOUBLE-GANG DEEP DEVICE BOX ANO STAINLESS FACEPLATE, PROVIDE WITH 90 OEOREE FITTINO. 3. PROVIDE 1.5" FLEXIBLE NONMETALLIC CONDUIT FROM JUNCTION BOX TO SYSTEMS FUANrTURE. COORDINATE CONNECTION FITTINO AT BASE OF FURN!TURE WITH FINAL APPROVED SYSTEMS FURNITURE SHOP DRAWINGS. ♦IM E G TECHNOLOGY FURNITURE FEED DETAIL T_136_01 rn.MUll"-"'1--_,,!•r,Jc~•i,l'•)'TI 51 Addendum #1 July 6 , 2023 Page 4 Q6. I see that the access control product specified in division 28 13 00 is called Paxton Net2 system. It is mentioned that this system is existing. I was wondering if the City does indeed already have badge readers that are connected to a Paxton system. I'm trying to determine if the City is open to alternate products. A6 The City has the Paxton Net2 System. We currently use the Paxton system for all of our card readers at all facilities. As far as alternate products we aren't looking to have different systems for the facilities. They will all have to be the Paxton system or work with the Paxton system. Q7. A note on the plans on sheet FP2.1 calls out to remove the (E) 2" fire pipe that crosses the building. Additiona lly, notes on the fire protection plans call out to remove existing sprinklers, piping and appurtenances. And all new sprinkler heads are shown throughout the build ing on the proposed p lans. Is this required or do these only need to be removed/modified as necessary to accommodate construction, ceiling heights, and based on any deficiencies in size from the hydraulic calculations. A 7 Fire sprinkler main and branch routing, shown on the bid set, is based on limited field verification. Contractor shall verify exact locations in field and coordinate necessary revisions/relocations, for entire building, with improvement plans. Revisions/relocations shall be prepared as a deferred submittal, with appropriate engineering calculations and professional engineer's stamp. The area of the council chamber improvement is known to impact the existing system more substantially than other areas: an existing 2 " main appears to be running in conflict with HVAC improvements, that are location critical, and it should be planned for relocation. Additionally, branch routing in the council chamber improvement area should be planned for relocation due to the maximization of finished ceiling height in the center of that space. The FP drawings indicate and extent of relocation of 2 " main line extending from the central corridor back toward the riser, we do not believe this is necessary to accommodate improvements but should be confirmed by the contractor prior to bidding. Q8. Sheet A61 .2 ca ll s for "3) PUTTY PADS SHALL BE PROV IDED AT ALL BACK BOXES, SEE DETAIL 19/A61.4 ." Do you really want all back boxes in all walls, whether fire rated or not? If so perhaps you should allow for an acoustica l putty pad instead of the fire rated pads called out on 19/A61.4. If you do want them on all back boxes for acoustics , perhaps you dont really need them on exterior walls . WALL TYPE SCHEDULE HAT C()tlfRAC l 00'9 DISCRETK>H, t,,():1-TYPP. ~ OVPSUM BOARO [STAHOMO)M,\V' Ot useo AT NON RA TEO W"ll CONOrTt():15 1! REFER TO PO,E.lR.-.~ J:11:E STOP AJJ!J OTHER PE.LATED OE.lAIL.S ON SttEfiT MU " H FVTTV Pf~IAU..0 OVIOCD.~DACP<B()XtA.. stt Oc.Jhll IQ,AGld, e.\lIIl.PAD ,iw,,., 19 AB Provide acoustic putty pads at all partition walls. Exterior walls, furred walls at exterior, do not require putty pads. Provide fire rated putty pads at fire rated walls only. 52 Q9. Addendum #1 July 6 , 2023 Page 5 Please tell us if the exi sting interior walls on the second fl oor, we re fram ed with the bottom plat e as shown on the left, (w ith no gypcrete und er th e bottom pl ate) or th e bottom pl ate as shown on th e right (with gypcrete passing und er the bottom plate). We are trying to figure out how mu ch gypcrete patch ing will be needed , and that de pends on your answer to thi s question. -~==J 11 ~ -Ill ==--· -~c--· A9 As built plans/details are not conclusive on this existing condition; for the purpose of bidding, please assume that partition wall tracks are set on top of existing topping. Q10. Do we need to overex and recompact soils at the generator/trash enclosure masonry wall footings and slab? If so how much? A 10 Structural Response: Soils report was not provided as a part of this project thus minimum CBC requirements were followed as indicated on S -0. 1 "Foundation Notes (No Soils Report)". Bottom of footings shall be as indicated on plans and supporting soils shall have minimum compaction as indicated in the foundation general notes. If unsuitable soils are found, follow requirements stated in the general notes. Q11. We seek clarification regarding the extents of asphalt demo and patch for the irrigation portion of the project Existing Mainline Location: a. As per the irrigation plans, the location of the existing ma inline is stated as "to be determined in the field by the contractor." We cannot determine the location prior to bid time. Is there an as-bu ilt drawing ava ilable that shows the layout of t he existing main line? If not, can we assume the accuracy of the main line's location as depicted on the drawings for bidding purposes? Irrigation Controller Placement: a. Could you please indicate on the plans the intended locations of both the new irrigation controller and the existing irrigation controller? This information will help us determin e if any adjustments need to be made t o the wiring and will impact our bid accordingly. Keep ing the contro ll er in the same location would be ideal. A 11 No as-builts are available and the City will not guarantee the irrigation mainline is where it's noted on the plans. It is anticipated that any additional irrigation will use the existing mainline and that tapping into that mainline can be achieved from within a landscape planter. No asphalt removal is anticipated. The new irrigation controller will be placed where the existing controller is and re-use the electrical as stated per plans. 53 Addendum #1 July 6, 2023 Page 6 Q12. Note 8 on A-12.1 says: Install R-30 BATT Insulation at underside of roof, typical entire 2 nd Floor. But pictures seem to already show existing insulation , shall we remove existing insulation and provide new? A 12 Existing insulation to remain unless it is impacted by demolition/improvement work. New insulation shall be installed where existing insulation does not occur or remain. Q12. Clarification on the "USG Geometrix" ceiling tile at Council Dias 131, see note 4 on A 12.1. The product comes in a few different profiles, depths and color option s. Also a choice of sol id a nd perforated panels. Can you provide this informatio n? A 12 Wedge Style, 2 ¼", flat white, solid (non-petforated) panels This add endum shall be made part of the above referenced project. Full compensation for all work and requirements of this addendum s h all be considered as included in the appropriate price proposal and no additional compensation will be allowed therefore. Jessica Sandifer, Deputy Parks and Recreation Director Questions regarding this addend um may be directed to the City's Project Representative Jessica Sandifer, jsandifer@moorparkca .gov no later than July 10, 2023 . ........................................................................................................................................... PLEASE EMAIL A SIGNED COPY OF ADDENDUM TO JESSICA SANDIFER AT JSANDIFER@MOORPARKCA.GOV AND INCLUDE WITH BID. RECEIPT OF THIS ADDENDUM IS HEREBY ACKNOWLEDGED. Company Name: Monet Construction, Inc. Authorized Representative: Richard Boctor Signature of Authorized Re-p-re_s_e-nt-a-tiv_e_;:_/____,..n""--+.,,, _ __,-~-------C'-.---------r ( 54 CITY OF MOORPARK PARKS, RECREATION &: COMMUNITY SERVICES DEPT. I 799 Moorpark Avenue, Moorpark, CA 93021 Main City Phone Number (805) 517-6200 I Fax (805) 532-2550 I moorpark@moorparkca.gov July 17, 2023 ADDENDUM NO. 2 TENANT IMPROVEMENTS 323 SCIENCE DRIVE Identification No. P&R-2023-01 NOTICE IS HEREBY GIVEN to all bidders and plan holders that the plans and specifications for the above described project are hereby amended as follows: CLARIFICATION Insulation between first and second floor: Please allow for 8,000 sq.ft. of R-19 acoustic batt insulation, attached in the joist bay/deck above 1st floor ceiling. Discard existing insulation where encountered during demolition. QUESTIONS: Q1. Electrical panel on roof that is exposed, is this being changed or upgraded? A 1. Confirmed: (E) panel '2h' to remain and reuse with circuit breakers as shown in panel schedule. Panel '2HA' is new. Q2. Crestron components are long lead time, is this acceptable as it relates to timing for the project? A2. Yes. Q3. Does the City have a data cable standard? A3. No. Q4. Fiber Backbone Cabling -Note-6 calls out fiber cabling but does not specify what type of cables and strand count? Specification 27 13 00 Backbone cabling does not specify what cable is required either. Please confirm what type of fiber cabling is required per Note 6 on Detail 1. Q5. There are 2 fiber standards described for the fiber backbone, OM3 MultiMode and OS2 Single Mode. Are we installing both as backbone connections between closets or should we prioritize one over the other? A4 &A5. Install minimum 12-strand OM3 fiber between telecommunications rooms. Singlemode is not required on this project. CHRIS R. ENEGREN Mayor RENEE DELGADO Councilmember DANIEL GROFF Councilmember TOM MEANS Councilmember DR. ANTONIO CASTRO Councilmember 55 Addendum #2 July 17, 2023 Page 2 06. Tree pruning -does the City want to do tree pruning per section 32 93 01 as well? A6. All tree pruning and removals have already been completed at the site. This addendum shall be made part of the above referenced project. Full compensation for all work and requirements of this addendum shall be considered as included in the appropriate price proposal and no add itional compensation w ill be allowed therefore. Jessica Sandifer, Deputy Parks and Recreatio n Director The time period for asking questions has passed, no additional clarifications will be made prior to bid due date . ..•............•........................................................................................................................... PLEASE EMAIL A SIGNED COPY OF ADDENDUM TO JESSICA SANDIFER AT JSANDIFER@MOORPARKCA.GOV AND INCLUDE WITH BID. RECEIPT OF THI S ADDENDUM IS HEREBY ACKNOWLEDGED. Company Name: Monet Construction, Inc. Authorized Representative: Richard Boctor, President Signature of Auth orized Re-p-re_s_e-nt-a-tiv_?(}D_:_/-=-=~,-....,..._[L; __ /) _________ _ ( 56 12853-0019\2476738v1.doc CITY OF MOORPARK CONTRACT DOCUMENTS FOR CITY HALL TENANT IMPROVEMENT PROJECT IDENTIFICATION NO. P&R-2023-01 EXHIBIT D 57 TABLE OF CONTENTS Page -i- Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc NOTICE INVITING BIDS ................................................................................................... NIB-1 INSTRUCTIONS TO BIDDERS ........................................................................................... IB-1 CHECKLIST FOR BIDDERS .................................................................................................... 1 BID ..................................................................................................................................B-1 CHECKLIST FOR EXECUTION OF CONTRACT .................................................................... 1 CONTRACT ......................................................................................................................... C-1 PAYMENT BOND (LABOR AND MATERIALS) ................................................................ LMB-1 PERFORMANCE BOND .................................................................................................... PB-1 INSURANCE CERTIFICATES AND ENDORSEMENTS ................................................... INS-1 GENERAL PROVISIONS ................................................................................................... GP-1 SPECIAL PROVISIONS ..................................................................................................... SP-1 APPENDIX I - CITY HOLIDAYS APPENDX II - CONSTRUCTION PLANSET APPENDIX III - TECHNICAL SPECIFICATIONS 58 NIB-1 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc NOTICE INVITING BIDS FOR CITY HALL TENANT IMPROVEMENT PROJECT [the “Project”] Identification number: P&R-2023-01 NOTICE IS HEREBY GIVEN that the City of Moorpark, California (“City”) invites sealed Bids for the Project. The City will receive such Bids at the City Clerk’s office, City Hall, 799 Moorpark Ave., Moorpark, California 93021 up to _________ a.m./p.m. on ________________________, at which time they will be publicly opened and read aloud. The official bid clock, which will establish the official bid time, will be determined by the City Clerk’s Division of the City of Moorpark. Bids must be submitted on the City’s Bid Forms. SCOPE OF WORK. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the tenant improvement project of approximately 22,464 s.f. 2-story building, including but not limited to selective demolition of interior improvements, construction of new council chambers and support spaces, private offices, open office areas, restroom improvements, millwork, finishes, lighting, convenience power, HVAC systems, security system, AV and broadcast system, fire sprinkler modifications, FM200 system, fire alarm system, exterior wall painting, window seal repair, exterior door infill and construction, site accessibility improvements, exterior site improvements, roofing, rooftop HVAC units, emergency generator, and trash area expansion and the associated enclosures, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Manager. The project is located at 323 Science Drive, Moorpark, CA 93021. OBTAINING BID DOCUMENTS. Bidders may obtain free copies of the Plans, Specifications and other Contract Documents online by visiting www.moorpark.ca.gov/bidding. Bidders are responsible for having the documents printed. NON - MANDATORY PRE-BID MEETING AND SITE VISIT. A non-mandatory pre-bid meeting will be held on ____________ at ________ a.m./p.m. at 323 Science Drive, Moorpark, CA 93021 followed by a non-mandatory site visit. Additional site visits will be offered prior to bid submittal. No allowances for cost adjustments will be made if a Bidder does not attend the pre-bid meeting and site visit and/or fails to adequately examine the Project site before submitting a Bid. REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS. In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)]. PREVAILING WAGES. In accordance with Labor Code Section 1770 et seq., the Project is a “public work.” The selected Bidder (Contractor) and any Subcontractors shall pay wages in 59 NIB-2 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc accordance with the determination of the Director of the Department of Industrial Relations (“DIR”) regarding the prevailing rate of per diem wages. Copies of those rates are on file with the Director of Public Works, and are available to any interested party upon request. The Contractor shall post a copy of the DIR’s determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR. BONDS. Each Bid must be accompanied by a cash deposit, cashier’s check, certified check or Bidder’s Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid submitted. Personal or company checks are not acceptable. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverages, within fifteen (15) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law. LICENSES. Each Bidder shall possess a valid Class A or B Contractor’s license issued by the California State Contractors License Board at the time of the Bid submission, unless this Project has any federal funding, in which case the successful Bidder must possess such a license at the time of Contract award. Subconsultants shall possess a valid Class A, B or C Contractor’s license. The successful Contractor must also possess a current City business license or purchase one upon award of the Contract. LIQUIDATED DAMAGES The successful bidder will be required to complete all work within XXX calendar days from the commencement date stated in the Notice to Proceed. In accordance with Government Code section 53069.85, City will be compensated for damages incurred due to delays for which the Contractor is responsible. The parties agree that determining City’s exact delay damages is and will continue to be impracticable and extremely difficult. As such, for each calendar day in excess of the time agreed upon for completion of the work, the Contractor shall pay to the City $125.00 per day, as liquidated damages and not as a penalty or forfeiture. Such amount shall constitute the only payment allowed for damages resulting from Contractor caused delays. The City shall have the right to deduct the amount of liquidated damages from any money due or that may become due under the Contract. The calendar days specified above includes the City’s Holiday Closures, as well as all legal holidays. Inspection is not available on all holidays and weekends. RETENTION SUBSTITUTION. Five percent (5%) of any progress payment will be withheld as retention. In accordance with Public Contract Code Section 22300, and at the request and expense of the Contractor, securities equivalent to the amount withheld may be deposited with the City or with a State or federally chartered bank as escrow agent, which shall then pay such moneys to the Contractor. Upon satisfactory completion of the Project, the securities shall be returned to the Contractor. Alternatively, the Contractor may request that the City make payments of earned retentions directly to an escrow agent at the Contractor’s expense. No such substitutions shall be accepted until all related documents are approved by the City Attorney. BIDDING PROCESS. The City reserves the right to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in its best interest. 60 NIB-3 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc For further information, contact the City’s Project Manager Jessica Sandifer, City of Moorpark (805) 517-6225, jsandifer@moorparkca.gov. By: _____________________________ ___________________________________ City Manager Date 61 IB-1 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc INSTRUCTIONS TO BIDDERS FORM OF BID. Bids shall be made on the Bid forms found herein. Bidders shall include all forms and fill in all blank spaces, including inserting “N/A” (for not applicable) where necessary. Each Bid must be submitted in a sealed envelope bearing the Bidder’s name and addressed to the City Clerk with the Project name and identification number (as described in the Notice Inviting Bids) typed or clearly printed on the lower left corner of the envelope. DELIVERY OF BIDS. The Bid shall be delivered by the time and date, and to the place specified in the Notice Inviting Bids. No oral, faxed, emailed, or telephonic Bids or alternatives will be considered. The time of delivery shall be conclusively determined by the time-stamping clock located at the City Clerk’s office. Bidders are solely responsible for ensuring that their Bids are received in proper time, and Bidders assume all risks arising out of their chosen means of delivery. Any Bid received after the Bid submission deadline shall be returned unopened. Bidders are invited to be present for Bid opening. Accepted Bids shall become the property of the City. AMENDED BIDS. Unauthorized conditions, limitations or provisos attached to a Bid may cause the Bid to be deemed incomplete and non-responsive. WITHDRAWAL OF BID. A Bid may be withdrawn without prejudice upon written request by the Bidder filed with the City Clerk before the Bid submission deadline. Bids must remain valid and shall not be subject to withdrawal for sixty (60) Days after the Bid opening date. BIDDER’S SECURITY. Each Bid shall be accompanied by cash, a certified or cashier’s check payable to the City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as principal and an admitted surety insurer as Surety, in an amount not less than ten percent (10%) of the amount set forth in the Bid. The cash, check or Bid Bond shall be given as a guarantee that, if selected, the Bidder will execute the Contract in conformity with the Contract Documents, and will provide the evidence of insurance and furnish the specified Bonds, within fifteen (15) Days after the date of delivery of the Contract Documents to the Bidder. In case of the Bidder’s refusal or failure to do so, the City may award the Contract to the next lowest responsible bidder, and the cash, check, or Bond (as applicable) of the lowest Bidder shall be forfeited to the City to the extent permitted by law. No Bid Bond will be accepted unless it conforms substantially to the form provided in these Contract Documents. QUANTITIES APPROXIMATE. Any quantities shown in the Bid form or elsewhere herein shall be considered as approximations listed to serve as a general indication of the amount of Work or materials to be performed or furnished, and as basis for the Bid comparison. The City does not guarantee that the actual amounts required will correspond with those shown. As deemed necessary or convenient, the City may increase or decrease the amount of any item or portion of Work or material to be performed or furnished or omit any such item or portion, in accordance with the Contract Documents. ADDENDA. The City may, from time to time, issue Addenda to the Contract Documents. Bidders are responsible for ensuring that they have received any and all Addenda. Each Bidder is responsible for verifying that it has received all Addenda issued, if any. Bidders must acknowledge receipt of all Addenda, if any, in their bids. Failure to acknowledge receipt of all Addenda may cause a Bid to be deemed incomplete and non-responsive. FACSIMILE NUMBER AND EMAIL ADDRESS. Bidders shall supply the City with a facsimile number and email address to facilitate transmission of Addenda and other information related to 62 IB-2 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc these Contract Documents. If the Addenda and other information are emailed, the City shall also send all documents by facsimile or U.S. Mail. Failure to provide such a facsimile number and email address may result in late notification. The City does not guarantee that it will provide any information by facsimile, email, or both. A Bidder shall be responsible for all Addenda regardless of whether Bidder received any such fax or email, and a Bidder shall have no recourse due to not receiving such facsimile, email or both. DISCREPANCIES IN BIDS. Each bidder shall set forth as to each item of Work, in clearly legible words and figures, a unit or line item Bid amount for the item in the respective spaces provided for this purpose. In case of discrepancy between the unit price and the extended amount set forth for the item, the unit price shall prevail. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or if the unit price is the same amount as the entry in the “extended amount” column, then the amount set forth in the “extended amount” column for the item shall prevail in accordance with the following: (1) As to lump sum items, the amount set forth in the “extended amount” column shall be the unit price. (2) As to unit price items, the amount set forth in the “extended amount” column shall be divided by the estimated quantity for the item set forth in the Bid documents, and the price thus obtained shall be the unit price. In case of discrepancy between words and figures, the words shall prevail. COMPETENCY OF BIDDERS. In evaluating Bidder responsibility, consideration will be given not only to the financial standing, but also to the general competency of the Bidder for the performance of the Project. Each Bidder shall set forth in the designated area of the Bid form a statement of its experience. No Contract will be executed with a Bidder that is not licensed and registered with the DIR in accordance with State law, and with any applicable specific licensing requirements specified in these Contract Documents. These licensing and registration requirements for Contractors shall also apply to all Subcontractors. BIDDER’S EXAMINATION OF SITE AND CONTRACT DOCUMENTS. Each Bidder must carefully examine the Project site and the entirety of the Contract Documents, including any addenda issued during the bidding period. Upon submission of a Bid, it will be conclusively presumed that the Bidder has thoroughly investigated the Work and is satisfied as to the conditions to be encountered and the character, quality, and quantities of Work to be performed and materials to be furnished. Upon Bid submission, it also shall be conclusively presumed that the Bidder is familiar with and agrees to the requirements of the Contract Documents, including all Addenda. No information derived from an inspection of records or investigation will in any way relieve the Contractor from its obligations under the Contract Documents nor entitle the Contractor to any additional compensation. The Contractor shall not make any claim against the City based upon ignorance or misunderstanding of any condition of the Project site or of the requirements set forth in the Contract Documents. No claim for additional compensation will be allowed which is based on a lack of knowledge of the above items. Bidders assume all risks in connection with performance of the Work in accordance with the Contract Documents, regardless of actual conditions encountered, and waive and release the City with respect to any and all claims and liabilities in connection therewith, to the extent permitted by law. 63 IB-3 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc TRADE NAMES OR EQUALS. Requests to substitute an equivalent item for a brand or trade name item must be made by written request submitted no later than the date specified in Section 4-6 of the General Provisions. Requests received after this time shall not be considered. Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability. DISQUALIFICATION OF BIDDERS. No Person shall be allowed to make, file or be interested in more than one Bid for the Project, unless alternate Bids are specifically called for. A Person that has submitted a sub-bid to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other Bidders or from making a prime Bid. If there is a reason to believe that collusion exists among the Bidders, all affected Bids will be rejected. RETURN OF BID SECURITY. The successful Bidder’s Bid security shall be held until the Contract is executed. Bid security shall be returned to the unsuccessful Bidders within a reasonable time, which in any case shall not exceed sixty (60) Days after the successful Bidder has signed the Contract. AWARD OF CONTRACT. The City reserves the right to reject any or all Bids or any parts thereof or to waive any irregularities or informalities in any Bid or in the bidding. The Contract award, if made, will be to the lowest responsible, responsive Bidder and is anticipated to occur within sixty (60) Days after the Bid opening. The Contract award may be made after that period if the selected Bidder has not given the City written notice of the withdrawal of its Bid. DETERMINATION OF LOWEST BID. In accordance with Public Contract Code Section 20103.8, the lowest Bid shall be determined as follows: The lowest bid shall be the lowest bid price on the base contract without consideration of the prices on the additive or deductive items. TRENCHING. If the Project involves the construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five (5) feet deep or more, then each Bidder must submit, as a Bid item, adequate sheeting, shoring, and bracing, or an equivalent method, for the protection of life or limb, which shall conform to applicable safety orders. This final submission must be accepted by the City in advance of excavation and must include a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from caving ground during the excavation Work. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. LISTING SUBCONTRACTORS; SELF-PERFORMANCE. Each Bidder shall submit a list of the proposed Subcontractors on the Project, as required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100, et seq.). Contractor shall self-perform not less than 50% of the Work, in accordance with Section 3-2 of the Standard Specifications. EXECUTION OF CONTRACT. The selected Bidder shall execute the Contract in the form included in these Contract Documents within fifteen (15) Days from the date of delivery of the Contract Documents to the Bidder. Additionally, the selected Bidder shall also secure all insurance and Bonds as herein specified, and provide copies to the City, within fifteen (15) Days from the date of delivery of the Contract Documents to the Bidder. Failure or refusal to execute the Contract or to conform to any of the stipulated requirements shall be just cause for the annulment of the award and forfeiture of the Bidder’s security. In such event, the City may declare 64 IB-4 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc the Bidder’s security forfeited to the extent permitted by law, and the City may award the Contract to the next lowest responsible, responsive Bidder or may reject all bids. NO COMPENSATION FOR COSTS INCURRED PRIOR TO CONTRACT EXECUTION. All costs incurred by the selected Bidder prior to Contract award and execution of the Contract by the City shall be at the Bidder’s sole risk. City shall have no liability for costs incurred prior to its execution of the Contract. SIGNATURES. The Bidder shall execute all documents requiring signatures, and shall cause to be notarized all documents that indicate such a requirement. Bids submitted as joint ventures must so state and be signed by each joint venturer. The Bidder shall provide evidence satisfactory to the City, such as an authenticated resolution of its board of directors, a certified copy of a certificate of partnership acknowledging the signer to be a general partner, or a power of attorney, indicating the capacity of the person(s) signing the Bid to bind the Bidder to the Bid and any Contract arising therefrom. Alternatively, Bids submitted by corporations must be executed as specified in Corporations Code Section 313, and Bids submitted by partnerships must be executed by all partners comprising the partnership. INSURANCE AND BONDS. The Contractor shall not begin Work until it has given the City evidence of all required insurance coverage (including all additional insured endorsements), a Bond guaranteeing the Contractor’s faithful performance of the Contract, and a Bond securing the payment of claims for labor and materials. TELEPHONES. Bidders are hereby notified that the City will not provide telephones for their use at the time of Bid submission. INTERPRETATION OF CONTRACT DOCUMENTS. Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the City a written request for an interpretation or correction not later than ten (10) Days before the Bid submission deadline. Such submission, if any must be sent to the Project Manager, Jessica Sandifer by emailing to jsandifer@moorparkca.gov. Requests for clarification received after this date will be disregarded. Please indicate the Project and identification number in the request for clarification. Telephonic requests will not be taken. Any interpretation or correction of the Contract Documents will be made only by a written Addendum. No oral interpretation of any provision in the Contract Documents shall be binding. TAXES. Except as may be otherwise specifically provided herein, all sales and/or use taxes assessed by federal, State or local authorities on materials used or furnished by the Contractor in performing the Work shall be paid by the Contractor. The Bidder shall calculate payment for all sales, unemployment, pension and other taxes imposed by federal, State, and local law and shall include these payments in computing the Bid. 65 PAGES: Checklist 1 and B-1 through B-18 are the Contractors Bid Proposal Documents and have been removed so as not to be duplicative. 66 B-19 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc CHECKLIST FOR EXECUTION OF CONTRACT TO BE SUBMITTED BY SUCCESSFUL BIDDER: ____ Two (2) executed and notarized copies of the Contract ____ Evidence satisfactory to the City indicating the capacity of the person(s) signing the Contract to bind the Contractor _____ Payment Bond in amount of the Contract ____ Performance Bond in amount of the Contract ____ Workers’ Compensation Certificate ____ Liability insurance certificate in the amounts specified in Section 5-4.2 of the General Provisions, naming the City as a co-insured ____ Automobile insurance certificate in the amount specified in Section 5-4.4 of the General Provisions, naming the City as a co-insured ____ Copy of City business license ____ Additional insured endorsement – comprehensive general liability ____ Additional insured endorsement – automobile liability ____ Additional insured endorsement – excess liability 67 PAGES: C-1 through C-16 are the Agreement Documents and have been removed so as not to be duplicative. 68 C-17 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc SAMPLE INSURANCE FORMS ACORD"' CERTIFICATE OF LIABILITY INSURANCE I DATE jMMIOONYYY) L___...- THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endor sed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this cert.ificate does not confer rights to the certificate holder in lieu o f such endorsement(s). ~-- PROOUCER Ii~ Nol: IN SUR ERIS, AFFORDING COVERAGE NAIC• INSURER A : INS\JRED INSURER B : INSURERC : ~SU~ER O : INSURER E : INSURER F : COVERAGES CERTI FICATE NUMBER· REVISION NUMBER· THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WI TH RE SPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PE RTAIN. THE INSURANCE AFFORDED BY THE POUOES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS . INSR LTA TYPE O F INSURANCE r,;'~/ .-:::.!. POLICY NUM8EA ' ,:N;·tJlllVI I IMWOMW.,., LIMITS COMMERCIAL GENERAL LIABll.ln' EACH OCCURRENCE $ -□ CI.AJMS-MI\OE □ OCCUR t"o~~Vs?J!~~r:-'--, -s -MEO EXP (Any one""''°"' $ PERSONAL & ADV INJURY $ - GENL AGGREGATE l,.IMIT APPLIES PER GENERAL AGGREGATE $ ~POI.ICY □~~ □ LOC PRODUCTS· COMP,iOP AGG s OTHER s AUTOM081L.E l lABaLITV w~~~.~NGLEUMJT s - :~~~ Fl SCHEDULED BODILY INJURY (Ptr per""1) $ - -AUTOS AUTOS BODIL y INJURY (?er ae,e.fOttlt) $ NON-O'M<ED ~?~~~AMAGE s -HIRED AUTOS AUTOS $ UMBRELLA UAB H OCCUR EACH OCCURRENCE $ - EXCESS LlAB CLAIMS-MADE AGGREGATE s OED I I RETENTION$ s WORKERS COM.PeNSATIO N l ~~MC I 1i~H- AND EMPLOYERS" LIABILITY YIN ANY PROPRtETO~A.RTNER/EXECUTIVE □ NIA E-L EAC>l ACCIDENT $ OFFICER/MEMBER EXCLUOEOI) (Ma ndatory In NH) E-L l)jSEASE . EA EMPLOYEE $ u~~~~ ~OPERArroNS betow E.L DISEASE -POLICY Lit.IT $ I I DESCRIPTION OF OPERATIONS I LOCATQNS I vauctes (ACORO 10t, Additional Re m~J'ks ~edule. may be ~che d if more sp11ce Is requi~) Add: "T he Crty o f Moorpark , rts o fficers, o fficials, emplo yees, a gents are named a s a ddrtional Insu red per forms C G 20 10 04 13 and C G 20 37 0 4 13" Attachments: Additional Insured Endorseme nt (Ongoing Operations) Additional Insured Endorse ment (Completed Operations) P rimary, Non-contributory Endorsement Waiver of Subrogation CERTIFICATE HO LDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE W ILL BE DELIVER.ED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENT A TfVE I © 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (2014/01) The ACORD name and logo a re r egi stered m arks of ACORD 69 C-18 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc POLICY N UMBER: COMMERCIAL GENERAL LIABILITY CG20100413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED -OWNERS, LESSEES OR CONTRACTORS -SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the followi ng: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) L ocation(s) Of Covered Operations Information required to complete this Schedule if not shown above will be shown in the Declarations. A. Section II -Who Is A n Insured is amended to include as an addit ional insured the person(s) or organization(s) shown in the Schedule, but only w it h respect to liability for ''bod ily injury", "property damage" o r "persona l and advertising injury" caused, in whole or in part, by: 1 . Your acts or omissions; o r 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. Howeve r: 1 . The insurance afforded to such additional insured only applies to the extent perm itted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, t he insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additiona l insured. B. With respect to t he insurance affo rded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" o r "property damage" occurring after: 1 . All work, including materials, parts o r equipment fu rnished in connect ion with such work, on t he project (other t han service, maintenance or repairs) to be performed by o r on behalf of the additional insured(s) at the location of the covered operations has been completed; o r 2. That portion of "your work'' out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20100413 © Insurance Services Office, Inc., 2012 Page 1 of2 70 C-19 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc C. With respect to the insurance afforded to these additional insureds, the follow ing is added to Section Ill -Limits Of Insurance: If coverage provided to the additional insured is requi red by a cont ract o r agreement, the most we w ill pay on behalf of the additional insured is the amount of insurance: 1. Requ ired by the contract o r agreement; or 2. Avai lable under the applicable Limits of Insurance shown in the Dec lara tions; w hichever is less. This endorsement s hall not increase the applicable Limits of Insurance shown in the Declarations. Page 2of 2 © Insurance Services Office, Inc., 2012 CG 2010 0413 71 C-20 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc POLICY N U MBER: COMMERCIAL GENERAL LIABILITY CG 20 37 0413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED -OWNERS, LESSEES OR CONTRACTORS -COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMM ERC IAL G EN ERAL LI ABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Oraanization/sl Location And Description Of Completed O.,..rations Information required to complete this Schedule if not shown above will be shown in the Declarations. A . Section II -W ho Is An Insured is amended to include as an additional insured the person(s) o r organization(s) shown in the Schedule , but only w ith respect to liability for "bodily injury" or "property damage" caused, in whole or in part , by ''your work" at the location designated and described in the Schedule of this endorsement performed for that additi onal insured and included in the "products-completed operations hazard". However: 1 . The insurance afforded to such additional insured only applies to t he extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additiona I insured. B . With respect to the insurance afforded to these addit ional insureds, the following is added to Section Ill -Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we w ill pay on behalf of the additiona l insured is the amount of insurance: 1 . Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; w hic hever is less. This endorsement shall not increase the applica ble Limits of Insurance shown in the Declarations. CG 2037 0413 © Insurance Services Office, Inc., 2012 Page 1 of 1 72 LMB-1 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Bond No. __________ PAYMENT BOND (LABOR AND MATERIALS) KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the City of Moorpark (“City”), State of California, has awarded to (“Principal”) (Name and address of Contractor) a contract (the “Contract”) for the Work described as follows: CITY HALL TENANT IMPROVEMENT PROJECT - 323 SCIENCE DRIVE, MOORPARK, CA (Project name) WHEREAS, under the terms of the Contract, the Principal is required before entering upon the performance of the Work, to file a good and sufficient payment Bond with the City to secure the claims to which reference is made in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code. NOW, THEREFORE, we, the undersigned Principal, and (Name and address of Surety) (“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City and all contractors, subcontractors, laborers, material suppliers, and other persons employed in the performance of the Contract and referred to in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code in the penal sum of Dollars ($ ), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this Work or labor, that the Surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this Bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by City in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered. It is hereby expressly stipulated and agreed that this Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this Bond. Upon expiration of the time within which the California Labor Commissioner may serve a civil wage and penalty assessment against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1741, and upon expiration of the time within which a joint labor management committee may commence an action against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1771.2, if the condition of this Bond be fully performed, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect. 73 LMB-2 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc The Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or the Specifications accompanying the same shall in any manner affect its obligations on this Bond, and it does hereby waive notice of any such change, extension, alteration, or addition. IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated: “Principal” By: Its By: Its (Seal) “Surety” By: Its By: Its (Seal) Note: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE BEFORE DATE OF CONTRACT. Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located. 74 PB-1 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Bond No. __________ PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the City of Moorpark (“City”), has awarded to (“Principal”) (Name and address of Contractor) a contract (the “Contract”) for the Work described as follows: CITY HALL TENANT IMPROVEMENT PROJECT - 323 SCIENCE DRIVE, MOORPARK ,CA (Project name) WHEREAS, Principal is required under the terms of the Contract to furnish a Bond for the faithful performance of the Contract. NOW, THEREFORE, we, the undersigned Principal, and , (Name and address of Surety) (“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of Dollars ($ ), this amount being not less than the total Contract Price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors executors and administrators, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Contract and any alteration thereof made as therein provided, on the Principal’s part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void one year from the date of recordation of the Notice of Completion; otherwise, it shall be and remain in full force and effect. As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. Surety hereby waives any statute of limitations as it applies to an action on this Bond. The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or of the Work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations under this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the 75 PB-2 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Contract or to the Work or to the specifications. Surety hereby waives the provisions of California Civil Code Sections 2845 and 2849. The City is the principal beneficiary of this Bond and has all rights of a party hereto. IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated: “Principal” By: Its By: Its (Seal) “Surety” By: Its By: Its (Seal) Note: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE BEFORE DATE OF CONTRACT. Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located. 76 PB-3 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc PLEASE PROVIDE CONTACT INFORMATION FOR THE SURETY AND THE BROKER IN THE SPACE PROVIDED BELOW SURETY – Contact Information _________________________________________ _ Attn:______________________________________ _ Address:__________________________________ _ City State Zip_______________________________ Phone #:___________________________________ BROKER – Contact Information ______________________________________ _ Attn:__________________________________ _ Address:_______________________________ _ City State Zip ____________________________ Phone# ________________________________ 77 INS-1 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc WORKERS’ COMPENSATION CERTIFICATE OF INSURANCE WHEREAS, the City of Moorpark (“City”) has required certain insurance to be provided by: NOW THEREFORE, the undersigned insurance company does hereby certify that it has issued the policy or policies described below to the following named insureds and that the same are in force at this time: 1. This certificate is issued to: City of Moorpark City Hall 799 Moorpark Ave Moorpark, California 93021 The insureds under such policy or policies are: 2. Workers’ Compensation Policy or Policies in a form approved by the Insurance Commissioner of California covering all operations of the named insureds as follows: Policy Number Effective Date Expiration Date By: Its Authorized Representative 78 GP-1 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc GENERAL PROVISIONS SECTION 0. GENERAL PROVISIONS DEFINED 0-1 STANDARD SPECIFICATIONS The 2021 edition of “Standard Specifications for Public Works Construction” (“Standard Specifications”), as amended by the Contract Documents, is incorporated into the Contract Documents by this reference. The Work described herein shall be done in accordance with the provisions of the Standard Specifications, as amended by the Contract Documents. 0-2 NUMBERING OF SECTIONS The number of sections and subsections in these General Provisions are compatible with the numbering in the Standard Specifications. 0-3 SUPPLEMENTATION OF STANDARD SPECIFICATIONS The Sections that follow supplement, but do not replace, the corresponding provisions in Part 1 (General Provisions) of the Standard Specifications, except as otherwise indicated herein. In the event of any conflict between the Standard Specifications and these General Provisions, these General Provisions shall control. SECTION 1. GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-2 TERMS AND DEFINITIONS Whenever in the Standard Specifications or in the Contract Documents the following terms are used, they shall be understood to mean the following: Acceptable, Acceptance – or words of similar import shall be understood to be the acceptance of the City. Agency – The City of Moorpark. Applicable Laws – laws, statutes, ordinances, rules, codes, regulations, permits, and licenses of any kind, issued by governmental authorities or private authorities with jurisdiction (including utilities), to the extent they apply to the Work. Board – The City Council of the City of Moorpark. Contract Documents – As defined in Standard Specifications Section 1-2, but also including these General Provisions. Engineer – The City Engineer, acting either directly or through properly authorized agents. Such agents shall act within the scope of the particular duties entrusted to them. Inspector – An authorized representative of the City, assigned by the City to make inspections of Work performed by or materials supplied by the Contractor. 79 GP-2 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Laboratory – A laboratory authorized by the City to test materials and Work involved in the Contract. Notice of Completion – The notice authorized by Civil Code Section 9204. Project – See Work. Submittal – Any drawing, calculation, specification, product data, samples, manuals, requests for substitutes, spare parts, photographs, survey data, traffic control plans, record drawings, Bonds or similar items required to be submitted to the City under the terms of the Contract. Work – The construction or related work that is to be performed under the Contract, including furnishing all labor, materials, equipment, and services. 1-3.3 Institutions The institutions listed in Section 1-3.3 of Part 1 of the Standard Specifications shall be supplemented by the list below: Abbreviation Word or Words AAN ................................................................................... American Association of Nurserymen AGCA ....................................................................... Associated General Contractors of America APWA ................................................................................... American Public Works Association CRSI ..................................................................................... Concrete Reinforcing Steel Institute CSI ........................................................................................ Construction Specifications Institute NEC ........................................................................................................... National Electric Code NFPA .................................................................................... National Fire Protection Association SSS ........................................................................... State of California Standard Specifications, Latest edition, Department of Transportation SSP ....................................................................................... State of California Standard Plans, Latest edition, Department of Transportation 1-7.2 CONTRACT BONDS The Faithful Performance Bond shall remain in force until the date of recordation of the Notice of Completion and the end of all warranty periods set forth in the Contract Documents. The Material and Labor Bond shall remain in force until expiration of the time within which the California Labor Commissioner may serve a civil wage and penalty assessment against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1741, and until the expiration of the time within which a joint labor management committee may commence an action against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1771.2. All Bonds must be submitted using the required forms, which are in the Contract Documents, or on any other form approved by the City Attorney. SECTION 2. SCOPE OF THE WORK 2.2 PERMITS 80 GP-3 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Before starting any construction work, the Contractor will be required to obtain all necessary permits from the City, which may include obtaining a no fee encroachment permit for Work within the public right-of-way, as well as all other permits required from all other agencies. Should this Project require construction of trenches or excavations which are five (5) feet or deeper and into which a person is required to descend, the Contractor shall obtain a Cal/OSHA permit and furnish the City with a copy before Work can commence on this Project. Contractor shall bear all cost for fees for all agencies except for the City’s permit fees. Before acceptance of the Project, the Contractor shall submit all licenses, permits, certificates of inspection, and required approvals to the City. 2.4 COOPERATION AND COLLATERAL WORK The Contractor shall be responsible for coordinating all Work with the City’s street sweeping, trash pick-up, and street maintenance contractors, emergency services departments, utility companies’ crews, and others when necessary. Payment for conforming to these requirements shall be included in other items of Work, and no additional payment shall be made thereof. 2-5.4 Haul Routes Subsection 2-5.4 of Part 1 of the Standard Specifications shall be deleted and replaced as follows: The Contractor must obtain the City’s approval before using any haul routes. Further detail requirements for haul traffic can be obtained from the Public Works Department 805-517-6294. 2-7 CHANGES INITIATED BY THE AGENCY 2-7.1 General. The City reserves the right, without notice to the Surety, to increase or decrease the quantity of any item or portion of the Work described in the Contract Documents or to alter or omit portions of the Work so described, as may be deemed necessary or expedient by the City, without in any way making the Contract void. Such increases, alterations or decreases of Work shall be considered and treated as though originally contracted for, and shall be subject to all the terms, conditions and provisions of the original Contract. The Contractor shall not claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease, alteration or omission of any kind of Work to be done. 2-7.2 Allowances Adjustment For Contract items bid based on allowance, submit Change Order Request on difference between actual purchase amount and allowance, based on work-in-place. When requested, prepare explanations and documentation to substantiate amounts claimed for work done based on allowances. City reserves the right to establish actual quantity of work-in- place by independent quantity survey, measure, or count. 2-8 EXTRA WORK New and unforeseen work will be classified as Extra Work only when the Work is not covered and cannot be paid for under any of the various items or combination of items for which a Bid price 81 GP-4 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc appears on the Bid. The Contractor shall not do any Extra Work except upon written order from the City. 2-8.1 Work Directive Change City may direct changes in the Work by issuing a Work Directive given in writing to Contractor's representative or on-site superintendent or foreman in charge of the particular Work for which the Work Directive is given. A Work Directive shall describe the work to be undertaken and any change in the Work. A Work Directive shall only be used when the Work to be added or deleted must be accomplished before the Change Order procedure can be accomplished. THE CONTRACT PRICE AND CONTRACT TIME MAY ONLY BE ADJUSTED BY CHANGE ORDER AND MAY NOT BE ADJUSTED BY WORK DIRECTIVE. TO THE EXTENT THE WORK DIRECTIVE RESULTS IN A CHANGE TO THE CONTRACT PRICE OR THE CONTRACT TIME, CONTRACTOR MUST TIMELY REQUEST A CHANGE ORDER AND COMPLY WITH ALL CHANGE ORDER PROCEDURES IN ACCORDANCE WITH THIS SECTION. Notwithstanding issuance of a Work Directive, failure to timely request a Change Order shall constitute a waiver by Contractor of any adjustment to the Contract Price or Contract Time for the Work performed under the Work Directive. City shall not be liable to Contractor for Work performed or omitted by Contractor in reliance on verbal orders. 2-8.2 Change Order Work The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and the Contract Price and Contract Time shall be adjusted accordingly. All such changes in the Work shall be authorized by Change Order and shall be performed under the applicable conditions of the Contract Documents. A Change Order signed by the Contractor indicates the Contractor’s agreement therewith, including any adjustment in the Contract Price or the Contract Time, and the full and final settlement of all costs (direct, indirect, and overhead) related to the Work authorized by the Change Order. All requests for additional compensation to the Contractor shall be presented in writing before the expense is incurred and will be adjusted as provided herein. No work shall be allowed to lag pending such adjustment, but shall be promptly executed as directed, even if a dispute arises. No request for a change will be considered after the work in question has been done unless a written contract change order has been issued or a timely written notice of change or delay has been made by Contractor. Contractor shall not be entitled to claim or to bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions, and provisions of the original Contract. 2-8.3 Notice of Delay or Change With respect to any matter that may involve or require an adjustment to the Contract Time or the Contract Price, Contractor shall provide written notice of the underlying facts and circumstances that gave rise to the proposed change, within the following times: 1. If due to unknown subsurface or latent physical conditions, within three (3) days from the discovery date or prior to the alterations of the conditions, whichever is earlier. 82 GP-5 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 2. If due to any other matter that may involve an adjustment to the Contract Time or the Contract Price, within seven (7) days from the discovery date. 2-8.4 Request for Extension or Change Within twenty-one (21) days from providing the notice of delay or change, and prior to incurring any expense, Contractor shall submit a Change Order Request. The Change Order Request shall identify the amount of the adjustment to the Contract Price or the Contract Time, or both. The Change Order Request shall contain all supporting documentation for the proposed changes, including but not limited to data showing the hours worked, cost estimates, invoices, and schedules. If the Change Order Request includes a request for an extension of the Contract Time, the Change Order Request shall include a time impact analysis showing the impact of the underlying facts and circumstances to the critical path. City may request, and Contractor shall provide, any additional information supporting the Change Order Request, including but not limited to native electronic format version of schedules and time impact analyses. If any added costs or information cannot be determined at the time of the Change Order Request, Contractor shall identify the reason the costs or information cannot be determined. For any costs or information that cannot be determined at the time Contractor submits the Change Order Request, Contractor shall submit to City notice of the costs or information and all supporting documentation within three (3) days of when the costs or information become subject to determination. Whenever possible, any changes to the Contract Price shall be in a lump sum mutually agreed by the Contractor and the City. Price quotations from the Contractor shall be accompanied by such detailed supporting documentation, including but not limited to estimates and quotations from subcontractors or material suppliers, as City may reasonably request. If the Contractor fails to submit a complete cost proposal within the twenty-one (21) Day period (or as requested), the City has the right to order the Contractor in writing to commence the work immediately on a force account basis and/or issue a lump sum change to the Contract Price in accordance with the City’s estimate of cost. If the change is issued based on the City estimate, the Contractor will waive its right to dispute the action unless within fifteen (15) Days following receipt of the City’s estimate, the Contractor presents written proof that the City’s estimate was in error. Estimates for lump sum quotations and accounting for cost-plus-percentage work shall be limited to direct expenditures necessitated specifically by the extra work, and shall be segregated as follows: 1. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the extra work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from Federal, State, or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the extra work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental. 83 GP-6 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 2. Materials. The cost of materials reported shall be at the lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight, and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice. If invoices or other satisfactory evidence of costs are not furnished within the time required for requesting a change of the Contract Price or Contract Time, then the City may determine the materials cost, at its sole discretion, or may determine that the Contractor waived all rights to payment for material costs pursuant to Section 2-8.5. 3. Tool and Equipment Use. Regardless of ownership, the rates to be used in determining equipment use shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the work is performed. The Contractor shall furnish cost data supporting the establishment of the rental rate. The rental rate to be applied for use of each item of equipment shall be the rate resulting in the least total cost to the City for the total period of use. The City shall the make the final determination as to an equitable rental rate for the equipment. No payment will be made for the use of small tools, which have a replacement value of $1,000 or less. i. The rental time to be paid for equipment shall be the time the equipment is in productive operation on the extra work being performed. Rental time will not be allowed while equipment is inoperative due to breakdowns. ii. All equipment shall, in the opinion of the City, be in good working condition and suitable for the purpose for which the equipment is to be used. Equipment with no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer. iii. Before construction equipment is used on any extra work, the Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the City, in duplicate, a description of the equipment and its identifying number. iv. When hourly rates are listed, any part of an hour less than 30 minutes of operation shall be considered to be 1/2-hour of operation, and any part of an hour greater than 30 minutes will be considered one hour of operation. When daily rates are listed, any part of a day less than 4 hours operation shall be considered to be 1/2-day of operation. 4. Allowed Mark-up. The allowed mark-up for any and all overhead (including supervision and home and field office costs) and profit on work added to the Contract shall be determined in accordance with the following provisions: i. “Net Cost” is defined as the actual costs of labor, materials and tools and equipment only, excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and subcontractors at cost only, without mark-up. Contractor shall provide City with documentation of the costs, including but not limited to payroll records, invoices, and such other information as City may reasonably request. ii. For Work performed by the Contractor’s forces the allowed mark-up shall not exceed fifteen (15%) percent of Labor costs, ten percent (10%) of Material costs, and ten percent (10%) of the cost of Tools and Equipment use. 84 GP-7 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc iii. For Work performed by a subcontractor or sub-subcontractor, the allowed mark-up shall not exceed ten (10%) percent of the subcontractor’s or sub-subcontractor’s Net Cost of the Work. For added or deducted Work by subcontractors, the Contractor shall furnish to the City the subcontractor’s signed detailed records of the cost of labor, material, and equipment, including the subcontractor markup for overhead and profit. The same requirement shall apply to sub- subcontractors. For added or deducted work furnished by a vendor or supplier, the Contractor shall furnish to the City a detailed record of the cost to the Contractor, signed by such vendor or supplier. Contractor shall not be entitled to any compensation for Work subject to a change order except as expressly set forth in this Section. The mark-up added in instances of extra or additional work shall constitute the entire amount of profit, any mark-ups, any field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such work. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order. No claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s Change Order form in an attempt to reserve additional rights. If the City disagrees with the proposal submitted by Contractor, it will notify the Contractor, and the City will provide its opinion of the appropriate price and/or time extension. If the Contractor agrees with the City, a change order will be issued by the City. If no agreement can be reached, the City shall have the right to issue a unilateral change order setting forth its determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. Such determination shall become final and binding if the Contractor fails to submit a claim in writing to the City within fifteen (15) Days of the issuance of the unilateral change order, disputing the terms of the unilateral change order and providing such supporting documentation for its position as the City may reasonably require. No dispute, disagreement, or failure of the parties to reach agreement on the terms of the Change Order shall relieve the Contractor from the obligation to proceed with performance of the changed work, including extra work, promptly and expeditiously. Any alterations, extensions of time, extra work, deductions in work, or any other changes may be made without securing consent of the Contractor’s surety or sureties. 2-8.5 Waiver of Rights of Contractor Failure by contractor to provide timely notice and request where such notice and request is required by this Section shall constitute a waiver by contractor of the right to a contract adjustment on account of such circumstances and a waiver of any right to further recourse or recovery by reason of or related to such change by means of the claims dispute resolution process or by any other legal process otherwise provided for under applicable laws. 85 GP-8 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc SECTION 3. CONTROL OF THE WORK 3-1 ASSIGNMENT Any purported assignment without written consent of the City shall be null, void, and of no effect, and the Contractor shall hold harmless, defend and indemnify the City and its officers, officials, employees, agents and representatives with respect to any claim, demand or action arising from or relating to any unauthorized assignment. If the City opts to consent to assignment, the City’s consent shall be contingent upon: (1) a letter from the Surety agreeing to the assignment and assigning all of the Bonds to the assignee without any reduction, or the assignee supplying all new Bonds in the amounts originally required under the Contract Documents; and (2) the assignee supplying all of the required insurance in the amounts required in the Contract Documents. Until the Surety assigns all of the Bonds or the assignee supplies all of the new Bonds, and until the assignee supplies all of the required insurance, an assignment otherwise consented to in writing by the City shall not be effective. Even if the City consents to assignment, no assignment shall relieve the Contractor of liability under the Contract. 3-5 INSPECTION The Contractor shall arrange and pay for all site inspection of the Work including any off-site inspection, required by any ordinance or governing authorities. The Contractor shall also arrange and pay for other inspections, including tests in connection therewith, as may be assigned or required. If the Contract Documents, the City, or any instructions, laws, ordinances, or public authority requires any part of the Work to be tested or Approved, Contractor shall provide the City at least two (2) working days’ notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection. Required certificates of inspection (or similar) shall be secured by Contractor. Costs for initial testing and City inspection shall be paid by the City. Costs of re-tests and/or re- inspection for Work found not to be in compliance shall be paid by the Contractor. Costs for inspection by authorities other than the City shall be paid for by the Contractor. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into the Work If the manufacture of materials to be inspected or tested will occur in a plant or location greater than sixty (60) miles from the City, the Contractor shall pay for any excessive or unusual costs 86 GP-9 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging. Re-examination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of re-examination and re-construction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs. 3.7 CONTRACT DOCUMENTS 3-7.1 General In addition to the requirements under Section 3-7.1 in the Standard Specifications, the Contractor shall maintain a control set of Plans and Specifications on the Project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on the control set to show the as-built conditions. This control set of Plans shall also be edited for all Addenda, Requests for Information, Change Orders, field changes not involving cost, and any other variation that occurred during construction. Upon completion of all Work, the Contractor shall return the control set to the City. Final payment will not be made until this requirement is met. Where a work feature is shown on the drawings or identified in the Specifications but is not specifically indicated as an item in the Bid sheets, and there is no ambiguity regarding the requirement to construct, install, or construct and install that work feature, the Contractor is required to complete the work feature. All costs to the Contractor for constructing, installing, or both constructing and installing such a work feature shall be included in the Bid. 3-7.2 Precedence of the Contract Documents The Contract Documents are intended to be fully cooperative and to be complementary. If Contractor observes that any of the Contract Documents are in conflict, the Contractor shall promptly notify the City in writing. With regard to Section 3-7.2 in the Standard Specifications, in case of conflicts between the Contract Documents, the order of precedence shall be as follows: 1. Permits issued by regulatory agencies with jurisdiction. 2. Change Orders and Supplemental Agreements, whichever occurs last. 3. Contract/Agreement. 4. Addenda. 5. Notice Inviting Bids. 6. Instructions to Bidders. 7. Bid/Proposal. 8. Special Provisions. 9. General Provisions. 10. Plans. 11. Standard Plans. 12. Standard Specifications. 13. Reference Specifications. With reference to the Drawings, the order of Precedence shall be as follows: 87 GP-10 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 1. Figures govern over scaled dimensions. 2. Detail drawings govern over general drawings. 3. Addenda or Change Orders drawings govern over Contract Drawings 4. Contract Drawings govern over Standard Drawings 5. Contract Drawings govern over Shop Drawings 3-7.3 Examination of the Contract Documents Before commencing any portion of the Work, Contractor shall again carefully examine all Contract Documents, the Site and other information given to Contractor as to materials and methods of construction and other Work requirements. Contractor shall immediately notify the City of any potential error, inconsistency, ambiguity, conflict or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained in the Contract Documents, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any subcontractor proceed with Work if uncertain as to the applicable requirements. 3-7.4 Request for Information; Additional Instructions Contractor may make a written request for information from the City to address any error, inconsistency, ambiguity, conflict or lack of detail or explanation in the Contract Documents. The City will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work. City shall respond to Requests for Information within a reasonable time. For purposes of this section ten (10) calendar days shall constitute a reasonable time. If additional time is needed, the City will notify the Contractor with the approximate timing. 3-7.5 Contractor’s Variation from Contract Documents If Contractor varies from the requirements of the Contract Documents including the requirement to comply with all Applicable Laws, the City may at any time, before or after completion of the Work, order the improper Work removed, remade, or replaced by the Contractor at the Contractor’s sole expense. 3-8 SUBMITTALS 3-8.1 Submittals Contractor shall furnish to the City for approval, prior to purchasing or commencing any Work, a log of all samples, material lists and certifications, mix designs, schedules, and other submittals, as required in the Contract Documents. The log shall indicate whether samples will be provided in accordance with other provisions of this Contract. Contractor will provide samples and submittals, together with catalogs and supporting data required by the City, to the City within a reasonable time period to provide for adequate review and avoid delays in the Work. The requirements in shall not authorize any extension of time for performance of this contract. City will review such samples, but only for conformance with design concept of work and for 88 GP-11 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc compliance with information given in the Contract Documents. Work shall be in accordance with approved samples and submittals. 3-8.3 Shop Drawings Contractor shall check and verify all field measurements and shall submit with such promptness as to provide adequate time for review and cause no delay in its own Work or in that of any other contractor, subcontractor, or worker on the Project, electronic files of all shop drawings, calculations, schedules, and materials list, and all other provisions required by the Contract Documents. Contractor shall sign all submittals affirming that submittals have been reviewed and approved by Contractor prior to submission to City. Each signed submittal shall affirm that the submittal meets all the requirements of the Contract Documents except as specifically and clearly noted and listed on the transmittal letter of the submittal. Contractor shall make any corrections required by the City, and file with the City corrected electronic files, and furnish such other copies as may be needed for completion of the Work. City’s acceptance of shop drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called City’s attention to such deviations at time of submission and has secured the City’s written acceptance. City’s acceptance of shop drawings shall not relieve Contractor from responsibility for errors in shop drawings. 3-9 SUBSURFACE DATA If the City or its consultants have made investigations of subsurface conditions in areas where the Work is to be performed, such investigations shall be deemed made only for the purpose of study and design. If a geotechnical or other report has been prepared for the Project, the Contractor may inspect the records pertaining to such investigations subject to and upon the conditions hereinafter set forth. The inspection of the records shall be made in the office of the City. It is the Contractor’s sole responsibility to determine whether such investigations exist, and the City makes no affirmative or negative representation concerning the existence of such investigations. The records of any such investigations are made available solely for the convenience of the Contractor. It is expressly understood and agreed that the City, their agents, consultants or employees assume no responsibility whatsoever with respect to the sufficiency or accuracy of any investigations, the records thereof, and the interpretations set forth therein. No warranty or guarantee is expressed or implied that the conditions indicated by any such investigations or records are representative of those existing in the Project area. The Contractor agrees to make such independent investigations and examination as necessary to be satisfied of the conditions to be encountered in the performance of the Work. The Contractor represents that it has studied the Plans, Specifications and other Contract Documents, and all surveys and investigation reports of subsurface and latent physical conditions, has made such additional surveys and investigations as necessary for the performance of the Work at the Contract Price in accordance with the requirements of the Contract Documents, and that it has correlated the results of all such data with the requirements of the Contract Documents. No claim of any kind shall be made or allowed for any error, omission or claimed error or omission, in whole or in part, of any geotechnical exploration or any other report or data furnished or not furnished by the City. 3-10 SURVEYING 89 GP-12 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 3-10.1 General The Contractor shall verify all dimensions on the drawings and shall report to the City any discrepancies before proceeding with related Work. The Contractor shall perform all survey and layout Work per the information on the Project Plans. All surveying Work must conform to the Professional Land Surveyors’ Act (Business and Professions Code Section 8700 et seq). All Project surveying notes and “cut-sheets” are to be provided to the City after the completion of each surveying activity and all final surveying notes shall be provided before final payment to the Contractor. Construction stakes shall be set and stationed by Contractor at its expense. Unless otherwise indicated in the Special Provisions, surveying costs shall be included in the price of items bid. No separate payment will be made. Re-staking and replacement of construction survey markers damaged as a result of the Work, vandalism, or accident shall be at the Contractor’s expense. 3-11 CONTRACT INFORMATION SIGNS The names, addresses and specialties of the Contractor, Subcontractors, architects or engineers may not be displayed on any signage within the public right-of-way. This signage prohibition includes advertising banners hung from truck beds or other equipment. 3-12 WORKSITE MAINTENANCE 3-12.1 General. Clean-up shall be done as Work progresses at the end of each day and thoroughly before weekends. The Contractor shall not allow the Work site to become littered with trash and waste material, but shall maintain the same in a neat and orderly condition throughout the construction operation. Materials which need to be disposed shall not be stored at the Project site, but shall be removed by the end of each Working Day. If the job site is not cleaned to the satisfaction of the City, the cleaning will be done or contracted by the City and shall be back-charged to the Contractor and deducted from the Contract Price. The Contractor shall promptly remove from the vicinity of the completed Work, all rubbish, debris, unused materials, concrete forms, construction equipment, and temporary structures and facilities used during construction. Final acceptance of the Work by the City will be withheld until the Contractor has satisfactorily complied with the foregoing requirements for final clean-up of the Project site. 3.12.4 Storage of Equipment and Materials. 3-12.4.1 General The Contractor shall make arrangements for storing its equipment and materials. The Contractor shall make its own arrangements for any necessary off-site storage or shop areas necessary for the proper execution of the Work. Approved areas within Work site may be used for temporary storage; however, the Contractor shall be responsible for obtaining any necessary permits from the City. In any case, the Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way or on any section where traffic is restricted at any time. The Contractor shall submit a staging plan for approval by the City. -- 90 GP-13 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc The Contractor shall deliver, handle, and store materials in accordance with the manufacturer’s written recommendations and by methods and means that will prevent damage, deterioration, and loss including theft. Delivery schedules shall be controlled to minimize long-term storage of products at the Project site and overcrowding of construction spaces. In particular, the Contractor shall provide delivery and installation coordination to ensure minimum holding or storage times for materials recognized to be flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other sources of loss. Storage shall be arranged to provide access for inspection. The Contractor shall periodically inspect to assure materials are undamaged and are maintained under required conditions. All costs associated with the clean-up and storage required to complete the Project shall be the sole responsibility of the Contractor. 3-12.4.2 Storage in Public Streets The first sentence of Section 3-12.4.2 shall not be incorporated and shall instead be replaced with the following: Construction materials and equipment shall not be stored in Streets, roads, or highways unless otherwise specified in the Special Provisions or approved by the City. 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY 3-13.1 Completion. The Contractor shall complete all Work under the Contract within ___________ (____) Working Days from the Notice to Proceed. 3-13.2 Acceptance The Project will not be considered complete and ready for City Council direction to staff regarding recordation of the Notice of Completion until all required Work is completed, the Work site is cleaned up in accordance with Section 3-12 of Part 1 of the Standard Specifications and the Special Provisions, and all of the following items have been received by the City: 1. A form of Notice of Completion, with all information required by the California Civil Code; 2. All written guarantees and warranties; 3. Evidence that the Performance Bond has been extended and will remain in effect for the period specified in Section 1-7.2 of the Standard Specifications, as modified by these General Provisions; 4. All “as-builts”; 5. Duplicate copies of all operating instructions and manufacturer’s operating catalogs and data, together with such field instructions as necessary to fully instruct City personnel in correct operation and maintenance procedures for all equipment installed listed under the electrical, air conditioning, heating, ventilating and other trades. This data and instructions shall be furnished for all equipment requiring periodic adjustments, maintenance or other 91 GP-14 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc operation procedures. The Contractor shall allow at least seven (7) Working Days’ notice for final inspection. Such notice shall be submitted to the City in writing. 3-13.3 Warranty Contractor warrants that all materials and equipment furnished under this Contract shall be new unless otherwise specified in the Contract Documents; and that all Work conforms to the Contract Document requirements and is free of any defect whether performed by the Contractor or any subcontractor or supplier. For the purposes of the calculation of the start of the warranty period, the Work shall be deemed to be completed upon the date of recordation of the Notice of Completion. If that direction is contingent on the completion of any items remaining on a punchlist, the Work shall be deemed to be completed upon the date of the City’s acceptance of the final item(s) on that punchlist. Unless otherwise stated, the warranty period shall be for one year. The Contractor shall repair or replace defective materials and workmanship as required in this Section 3-13.3 at its own expense. Additionally, the Contractor agrees to defend, indemnify and hold the City harmless from claims of any kind arising from damage, injury or death due to such defects. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work to complete or correct the work at issue. If the Contractor fails to promptly remedy any defect, or damage within this time; the City shall have the right to replace, repair, or otherwise remedy the defect, or damage at the Contractor’s expense. With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for Work performed and Materials furnished under this Contract, the Contractor shall: 1. Obtain for City all warranties that would be given in normal commercial practice or that are required in the Contract Documents. 2. Require all warranties to be executed, in writing, for the benefit of the City; and 3. Enforce all warranties for the benefit of the City, unless otherwise directed in writing by the City. The parties agree that no certificate given shall be conclusive evidence of the faithful performance of the Contract, either in whole or in part, and that no payment shall be construed to be in acceptance of any defective Work or improper materials. Further, the certificate or final payment shall not terminate the Contractor’s obligations under the warranty herein. The Contractor agrees that payment of the amount due under the Contract and the adjustments and payments due for any Work done in accordance with any alterations of the same, shall release the City, the City Council and its officers and employees from any and all claims or liability on account of Work performed under the Contract or any alteration thereof. 92 GP-15 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc SECTION 4. CONTROL OF MATERIALS 4-1 GENERAL The Contractor and all Subcontractors, suppliers, and vendors shall guarantee that the Work will meet all requirements of this Contract as to the quality of materials, equipment, and workmanship. 4-4 TESTING Except as elsewhere specified, the City shall bear the cost of testing materials and workmanship that meet or exceed the requirements indicated in the Standard Specifications and the Special Provisions. The cost of all other tests, including the retesting of material or workmanship that fails to pass the first test, shall be borne by the Contractor. 4-6 TRADE NAMES If the Contractor requests to substitute an equivalent item for a brand or trade name item, the burden of proof as to the comparative quality and suitability of alternative equipment or articles or materials shall be upon the Contractor, and the Contractor shall furnish, at its own expense, all information necessary or related thereto as required by the City. All requests for substitution shall be submitted, together with all documentation necessary for the City to determine equivalence, no later than thirty-five (35)Days after the award of Contract, unless a different deadline is listed in the Special Provisions. The Contractor shall be responsible for paying all costs related to a substituted “equal” material, process, or article. If a proposed “equal” substitution is rejected, Contractor shall be responsible for providing the specified material, process, or article without adjustment to the Contract Price or Contract Time. The City has the complete and sole discretion to determine if a material, process, or article is an “equal” material, process or article that may be substituted. SECTION 5. LEGAL RELATIONS AND RESPONSIBILITIES 5-3 LABOR 5-3.1 Public Work The Contractor acknowledges that the Project is a “public work” as defined in Labor Code Section 1720 et seq. (“Chapter 1”), and that this Project is subject to (a) Chapter 1, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the Director of Industrial Relations (“DIR”) implementing such statutes. The Contractor shall perform all Work on the Project as a public work. The Contractor shall comply with and be bound by all the terms, rules and regulations described in (a) and (b) as though set forth in full herein. 5-3.2 Copies of Wage Rates Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Project are on file at City Hall and will be made available to any interested party on request. By initiating any Work, the Contractor acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem 93 GP-16 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc wages, and the Contractor shall post such rates at each job site covered by these Contract Documents. The Contractor shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty paid to the City, forfeit two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to these Contract Documents by the Contractor or by any Subcontractor. 5-3.3 Payroll Records The Contractor shall comply with and be bound by the provisions of Labor Code Section 1776, which requires the Contractor and each Subcontractor to (1) keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776, (2) certify and make such payroll records available for inspection as provided by Section 1776, and (3) inform the City of the location of the records. The Contractor has ten (10) days in which to comply subsequent to receipt of a written notice requesting these records, or as a penalty to the City, the Contractor shall forfeit one hundred dollars ($100) for each Day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. The Contractor and each Subcontractor shall comply with and be bound by the provisions of Labor Code Section 1771.4(a)(3), which requires that each Contractor and each Subcontractor shall furnish the records specified in Section 1776 directly to the Labor Commissioner at least monthly, in a format prescribed by the Labor Commissioner. 5-3.4 Hours of Labor The Contractor acknowledges that eight (8) hours labor constitutes a legal day’s work. The Contractor shall comply with and be bound by Labor Code Section 1810. The Contractor shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty paid to the City, forfeit twenty- five dollars ($25) for each worker employed in the performance of this Project by the Contractor or by any Subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one (1) calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code Section 1815, work performed by employees of the Contractor in excess of eight (8) hours per day, and forty (40) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one-half (1-1/2) times the basic rate of pay. 5-3.5 Apprentices The Contractor shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6 and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. The Contractor shall be responsible for compliance with these Sections for all apprenticeable occupations. Before commencing Work on this Project, the Contractor shall provide the City with a copy of the information submitted to any applicable apprenticeship program. Within sixty (60) Days after concluding Work, Contractor and 94 GP-17 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc each of its Subcontractors shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Contract. 5-3.6 Debarment or Suspension The Contractor shall not perform Work with any Subcontractor that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. The Contractor and Subcontractors shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. If the Contractor or any Subcontractor becomes debarred or suspended during the duration of the Project, the Contractor shall immediately notify the City. 5-3.7 Registration with the DIR In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5. 5-3.8 Compliance Monitoring and Posting Job Sites This Project is subject to compliance monitoring and enforcement by the DIR. The Contractor shall post job site notices, as prescribed by regulation. 5-3.9 Subcontractors For every Subcontractor who will perform Work on the Project, the Contractor shall be responsible for such Subcontractor’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and the Contractor shall include in the written Contract between it and each Subcontractor a copy of the provisions in this Section 5-3 of the General Provisions and a requirement that each Subcontractor shall comply with those provisions. The Contractor shall be required to take all actions necessary to enforce such contractual provisions and ensure Subcontractor’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the Subcontractor and upon becoming aware of the failure of the Subcontractor to pay its workers the specified prevailing rate of wages. The Contractor shall diligently take corrective action to halt or rectify any failure. 5-3.10 Prevailing Wage Indemnity To the maximum extent permitted by law, the Contractor shall indemnify, hold harmless and defend (at the Contractor’s expense with counsel reasonably acceptable to the City) the City, its officials, officers, employees, agents and independent contractors serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed in Section 5-3 of the General Provisions by any Person (including the Contractor, its Subcontractors, and each of their officials, officers, employees and agents) in connection with any Work undertaken or in connection with the Contract Documents, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of the Contractor under this Section 5-3.10 shall survive expiration or termination of the Contract. 95 GP-18 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 5-4 INSURANCE 5-4.1 General The first paragraph of Section 5-4.1 of Part 1 of the Standard Specifications shall not be incorporated and shall instead be replaced with the following: The Contractor shall provide and maintain insurance naming the City, its elected and appointed officials, officers, employees, attorneys, agents, volunteers, and independent contractors in the role of City officials as insureds or additional insureds regardless of any inconsistent statement in the policy or any subsequent endorsement whether liability is attributable to the Contractor or the City. The insurance provisions shall not be construed to limit the Contractor’s indemnity obligations contained in the Contract. The City will not be liable for any accident, loss or damage to the Work prior to completion, except as otherwise specified in Section 6-5. 5-4.2 General Liability Insurance The Contractor shall at all times during the term of the Contract carry, maintain, and keep in full force and effect the insurance referenced in Section 5-4 of Part 1 of the Standard Specifications, as modified below. 5-4.2.1 Additional Insureds The City, its elected and appointed officials, officers, employees, attorneys, agents, volunteers, and independent contractors in the role of City officials, shall be the insured or named as additional insureds covering the Work, regardless of any inconsistent statement in the policy or any subsequent endorsement, whether liability is attributable to the Contractor or the City. 5-4.2.2 No Limitation on Indemnity The insurance provisions shall not be construed to limit the Contractor’s indemnity obligations contained in these Contract Documents. 5-4.2.3 Replacement Insurance The Contractor agrees that it will not cancel, reduce or otherwise modify the insurance coverage. The Contractor agrees that if it does not keep the required insurance in full force and effect, and such insurance is available at a reasonable cost, the City may take out the necessary insurance and pay the premium thereon, and the repayment thereof shall be deemed an obligation of the Contractor and the cost of such insurance may be deducted, at the option of the City, from payments due the Contractor. This shall be in addition to all other legal options available to the City to enforce the insurance requirements. 5-4.2.4 Certificates of Insurance with Original Endorsements The Contractor shall submit to the City certificates of insurance with the original endorsements, both of which reference the same policy number, for each of the insurance policies that meet the insurance requirements, not less than one (1) day before beginning of performance under the Contract. The endorsements are to be signed by a person authorized by that insurer to bind 96 GP-19 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc coverage on its behalf. Endorsements may be executed on the City’s standard forms titled “Additional Insured Endorsement,” copies of which are provided in the Contract Documents, or on any other form that contains substantially the same terms and is approved by the City’s Risk Manager. In any case, the endorsements must specifically name the City of Moorpark and its elected and appointed officials, officers, employees, attorneys, agents, volunteers, and independent contractors in the role of City officials as insureds or additional insureds. Current insurance certificates and endorsements shall be kept on file with the City at all times during the term of this Contract. The City reserves the right to require complete, certified copies of all required insurance policies at any time. 5-4.2.5 Subcontractors The Contractor shall require each of its Subcontractors that perform services under the Contract to maintain insurance coverage that meets all of the requirements of this Section 5-4. 5-4.5 Insurance Requirements not Limiting If the Contractor maintains broader coverage and/or higher limits than the minimums required in this Section 5-4, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 5.7 SAFETY 5-7.8 Steel Plate Covers 5-7.8.1 General The Contractor shall cover all openings, trenches and excavations at the end of each Work Day with steel plate covers. Section 5-8 is hereby added to Section 1 of Part 1 of the Standard Specifications, as follows: 5-8 INDEMNIFICATION The following indemnity provisions shall supersede the indemnity in Section 5-4.1 of the Standard Specifications. 5-8.1 Contractor’s Duty. To the fullest extent permitted by law, the Contractor shall, at its sole cost and expense, defend, hold harmless and indemnify the City and its elected officials, officers, attorneys, agents, employees, volunteers, successors, assigns and those City agents serving as independent contractors in the role of City officials (collectively “Indemnitees”), from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, stop payment notices, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith and the payment of all consequential damages (collectively “Liabilities”), in law or equity, whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of the Contractor, its officers, agents, servants, employees, Subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or 97 GP-20 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc individual for whom the Contractor bears legal liability) in the performance of the Contract, including the Indemnitees’ active or passive negligence, except for Liabilities arising from the sole negligence or willful misconduct of the Indemnitees, as determined by court decision or by the agreement of the Parties. The Contractor shall defend the Indemnitees in any action or actions filed in connection with any Liabilities with counsel of the Indemnitees’ choice, and shall pay all costs and expenses, including all attorneys’ fees and experts’ costs actually incurred in connection with such defense. The Contractor shall reimburse the Indemnitees for any and all legal expenses and costs incurred by Indemnitees in connection therewith. The City shall not be liable for any accident, loss, or damage to the Work prior to completion, except as otherwise specified in Section 6-5. 5-8.1.1 Taxes and Workers’ Compensation. The Contractor shall pay all required taxes on amounts paid to the Contractor under the Contract, and indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by the Contract. The Contractor shall fully comply with the Workers’ Compensation law regarding the Contractor and the Contractor’s employees. The Contractor shall indemnify and hold the City harmless from any failure of the Contractor to comply with applicable Workers’ Compensation laws. The City may offset against the amount of any fees due to the Contractor under the Contract any amount due to the City from the Contractor as a result of the Contractor’s failure to promptly pay to the City any reimbursement or indemnification arising under this Subsection 5-8.1.1. 5-8.1.2 Subcontractor Indemnity Agreements. The Contractor shall obtain executed indemnity agreements with provisions identical to those in this Section 5-8 from each and every Subcontractor or any other person or entity involved by, for, with or on behalf of the Contractor in the performance of the Contract. If the Contractor fails to obtain such indemnity obligations, the Contractor shall be fully responsible and indemnify, hold harmless and defend the Indemnitees from and against any and all Liabilities at law or in equity, whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of the Contractor’s Subcontractor, its officers, agents, servants, employees, Subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or individual for whom the Contractor’s Subcontractor bears legal liability) in the performance of the Contract, including the Indemnitees’ active or passive negligence, except for Liabilities arising from the sole negligence or willful misconduct of the Indemnitees, as determined by final court decision or by the agreement of the Parties. 5-8.2 Workers’ Compensation Acts not Limiting. The Contractor’s indemnifications and obligations under this Section 5-8, or any other provision of the Contract, shall not be limited by the provisions of any Workers’ Compensation act or similar act. The Contractor expressly waives its statutory immunity under such statutes or laws as to the City, its officers, agents, employees and volunteers. 5-8.3 Insurance Requirements not Limiting. The City does not, and shall not, waive any rights that it may possess against the Contractor because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to the Contract. The indemnities in this Section 5-8 shall apply regardless of whether or not any insurance policies are determined to be applicable to the 98 GP-21 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Liabilities, tax, assessment, penalty or interest asserted against the City. 5-8.4 Civil Code Exception. Nothing in this Section 5-8 shall be construed to encompass Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Contract is subject to Civil Code Section 2782(a) or the City’s active negligence to the limited extent that the underlying Contract Documents are subject to Civil Code Section 2782(b), provided such sole negligence, willful misconduct or active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. 5-8.5 Nonwaiver of Rights. Indemnitees do not and shall not waive any rights that they may possess against the Contractor because the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to these Contract Documents. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. 5-8.6 Waiver of Right of Subrogation. The Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all Claims arising out of or incident to the activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent or subsequent active or passive negligence by Indemnitees. 5-8.7 Survival of Terms. The Contractor’s indemnifications and obligations under this Section 5-8 shall survive the expiration or termination of the Contract, are intended to be as broad and inclusive as is permitted by the law of the State, and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against the Contractor shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision. 5-9 RECYCLING OF MATERIALS Subsection 5-9 is hereby added to the Standard Specifications as follows: 5-9.1 Construction and Demolition Ordinance The City of Moorpark has adopted a Construction and Demolition (C&D) ordinance requiring all demolition and city-sponsored projects, regardless of cost; new construction projects valued over $500,000; or renovation projects valued over $100,000 to divert a minimum of 65% of material generated during the project from disposal in a landfill (through reuse or recycling). The City has created a Construction and Demolition Materials Management Plan (C&DMMP) form to assist applicants to meet these diversion requirements. You will be required to submit a Diversion Security Deposit of 3% of the project valuation to the City to ensure compliance with the ordinance. The deposit will be returned upon verification that you met the 65% diversion requirement. Also, a one-time fee for staff time associated with processing your C&D plan will be 99 GP-22 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc charged. You have two options to meet this requirement. You may use the City’s franchised hauler (Waste Management) who can provide temporary bins and will dispose of your waste at a City authorized facility. Or you may self-haul your waste to a city authorized certified C&D processing facility. If you self-haul your waste you must use proper hauling vehicles and bins owned by your company and those vehicles must be driven by your employees. Please remember that because this project is a prevailing wage project, the driver of the self-haul vehicle will need to be paid a prevailing wage rate for driving the C&D materials to the authorized facility. You will need to submit itemized weigh tickets from each facility documenting your C&D recycling and disposal that indicates the weight and type of material recycled or disposed. These weigh tickets will need to be turned in to the Solid Waste Division and verified prior to final payment release for the job and refund of your C&D diversion security deposit. If diversion requirements are not met, the City will retain the deposit. Please contact the Solid Waste Division at 805-517- 6247 with questions about the C&D ordinance or about how to obtain the forms and documentation requirements. SECTION 6. PROSECUTION AND PROGRESS OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK 6-1.1 Construction Schedule One (1) week before the scheduled pre-construction meeting, the Contractor must submit to the City for review and approval the construction schedule required by the first paragraph of Section 6-1.1. The Contractor shall make revisions as required by the City. The schedule must account for all subcontract work, as well as the work of the Contractor, submittals, City review, coordination with the other contractors performing concurrent work and the Traffic Control Plan. The Contractor shall update this Construction Schedule when directed by the City, or when: a. A Change Order significantly affects the Contract completion date or the sequence of construction approach or activities; or b. The actual sequence of the Work, or the planned sequence of the Work, is changed and does not conform to the Contractor’s current accepted Project construction schedule. The Contractor shall submit an updated construction schedule with its monthly invoice every month. Progress payments shall be contingent upon the receipt of monthly updated construction schedules. 6-1.1.1 Pre-Construction Conference Approximately seven (7) Days before the commencement of Work at the site, a pre-construction conference will be held at the site and shall be attended by the Contractor’s Project manager, its on-site field superintendent, and any Subcontractors that the Contractor deems appropriate. Attendance by the Contractor and any Subcontractors designated is mandatory. Contractor shall submit its twenty-four (24) hour emergency telephone numbers to the City for approval a minimum of two (2) Working Days before the pre-construction conference. Unless previously submitted to the City, the Contractor shall bring to the pre-construction conference copies of each of the following: 100 GP-23 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 1) Construction Schedule. 2) Procurement schedule of major equipment and materials and items requiring long lead time. 3) Shop drawing/sample submittal schedule. 4) Preliminary schedule of values (lump sum price breakdown) for progress payment purposes. 5) Written designation of the on-site field superintendent and the Project manager. Both daytime and emergency telephone numbers shall be included in the written designation. The purpose of the conference is to designate responsible personnel and establish a working relationship. The parties will discuss matters requiring coordination and establish procedures for handling such matters. The complete agenda will be furnished to the Contractor before the meeting date. The Contractor shall be prepared to discuss all of the items listed below. 1) The Contractor’s construction schedule. 2) Notification of local residents before starting any Work and keeping them informed throughout the Project. 3) Procedures for transmittal, review, and distribution of the Contractor’s submittals. 4) Processing applications for payment. 5) Maintaining record documents. 6) Critical Work sequencing. 7) Maintaining sewage service during construction, including proposed by-passes. 8) NPDES requirements, if any. 9) Field decisions and Change Orders. 10) Use of Project site, office and storage areas, security, housekeeping, and the City’s needs. 11) Major equipment deliveries and priorities. 12) Traffic control. 13) Any other item that the City representative states is relevant to the meeting. 6-1.1.2 Weekly Progress Meetings Progress meetings will be held each week during the course of the Project. The meeting location, day of the week and time of day will be mutually agreed to by the City and the Contractor. The Contractor shall provide a three (3) week “look ahead” schedule at least 24 hours prior to each meeting. The construction manager will preside at these meetings and will prepare the meeting agenda, meeting minutes and will distribute minutes to all persons in attendance. As the Work progresses, if it is determined by agreement of the attendees, that weekly meetings are not necessary, the weekly progress meetings may be changed to bi-weekly progress meetings. 6-1.2 Commencement of the Work The Contractor shall not begin any construction activity at the site before the issuance of the Notice to Proceed. Any Work that is done by the Contractor in advance of the Notice to Proceed shall be considered as being done at the Contractor’s own risk and responsibility, and as a consequence will be subject to rejection. Section 6-1.3 is hereby added to Section 6 of Part 1 of the Standard Specifications, as follows: 6-1.3 Working Days And Hours 101 GP-24 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc The Contractor shall do all Work between the hours of 8 a.m. to 5 p.m., Monday through Friday. No Work will be allowed on Saturday, Sunday, or City holidays, which are noted in Appendix I. A permit may have other hours or Days for the Contractor to do the Work, and those hours and Days shall supersede any hours and Days written in this Section. Whenever the Contractor is permitted or directed to perform night Work or to vary the period during which Work is performed during the Working Day, the Contractor shall give twenty four (24) hours’ notice to the City so that inspection may be provided. A charge may be made to the Contractor for approved overtime or weekend inspections requested by the Contractor. 6-4 DELAYS AND EXTENSIONS OF TIME 6-4.1 General. Unless otherwise agreed in writing, an adjustment to the Contract time by reason of a Change Order shall be agreed to at the time the Change Order is issued and accepted by Contractor. If the Change Order does not reserve the right of the parties, or either of them, to seek an adjustment to the Contract time, then the parties forever relinquish and waive such right and there shall be no further adjustments to the Contract time. No extension of time will be granted for any event, including pandemics, leading to the issuance of a “stay at home” or similar kind of order by any local, State, or federal governmental authority, if the Work has been deemed, either by emergency order or proclamation, or operation of law, to be an essential service that is exempt from such stay at home or similar order. 6-4.2 Extensions of Time In the event it is deemed appropriate by the City to extend the time for completion of the Work, any such extension shall not release any guarantee for the Work required by the Contract Documents, nor shall any such extension of time relieve or release the Sureties on the Bonds executed. In executing such Bonds, the Sureties shall be deemed to have expressly agreed to any such extensions of time. The amount of time allowed by an extension of time shall be limited to the period of the delay giving rise to the same as determined by the City. Notwithstanding any dispute which may arise in connection with a claim for adjustment of the Contract time, the Contractor shall promptly proceed with the Work. 6-4.3 Payment for Delays Notwithstanding any other terms and conditions of the Contract Documents, the City shall have no obligation whatsoever to increase the Contract Price or extend the time for delays. Unless compensation and/or markup is agreed upon by the City, the Contractor agrees that no payment of compensation of any kind shall be made to the Contractor for damages or increased overhead costs caused by any delays in the progress of the Contract, whether such delays are avoidable or unavoidable or caused by any act or omission of the City or its agents. Any accepted delay claim shall be fully compensated for by an extension of time to complete the performance of the Work. This Section shall not apply to compensable delays caused solely by the City. If a compensable delay is caused solely by the City, the Contractor shall be entitled to a Change Order that: 102 GP-25 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc (1) extends the time for completion of the Contract by the amount of delay caused by the City; and (2) provides equitable adjustment, as determined by the City, to the Contractor. 6-8 TERMINATION OF THE CONTRACT FOR CONVENIENCE The following sentence is added to Section 6-8: In no event (including termination for impossibility or impracticability, due to conditions or events beyond the control of the City, for any other reason or for no reason) shall the total amount of money to Contractor exceed the amount which would have been paid to Contractor for the full performance of the services described in the Contract. 6-9 LIQUIDATED DAMAGES For the purposes of the calculation of the start of the liquidated damages, the Work shall be deemed to be completed when the same has been completed in accordance with the Plans and Specifications therefor and to the satisfaction of the City, and the City has certified such completion in accordance with Section 3-13.1 of Part 1 of the Standard Specifications. SECTION 7. MEASUREMENT AND PAYMENT 7.3 PAYMENT 7.3.1 General The unit and lump sum prices to be paid shall constitute full compensation for all labor, equipment, materials, tools and incidentals required to complete the Project as outlined in these Contract Documents and as directed by the City. In accordance with Public Contract Code Section 7107, if no claims have been filed and are still pending, the amount deducted from the final estimate and retained by the City will be paid to the Contractor except such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be withheld for any other lawful purposes. Contractor shall furnish within (10) Days of Notice to Proceed, on forms approved by the City, a detailed schedule of values giving a complete itemized breakdown of the Contract price. The schedule of values shall be adjusted as directed by the City. 7-3.2 Partial and Final Payment 7-3.2.1 Monthly Closure Date and Invoice Date For purposes of Section 7-3.2, the monthly closure date shall be the last Day of each month. A measurement of Work performed and a progress estimate of the value thereof based on the Contract and of the monthly payment shall be prepared by the Contractor and submitted to the City before the tenth (10th) Day of the following month for verification and payment consideration. The City shall have the right to adjust any measurement of quantity and to subsequently correct any error made in any measurement of quantity for payment. Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project. 7-3.2.2 Payments 103 GP-26 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc The City shall make payments within thirty (30) Days after receipt of the Contractor’s undisputed and properly submitted payment request, including an updated construction schedule pursuant to Section 6-1.1 of the General Provisions. The City shall return to the Contractor any payment request determined not to be a proper payment request as soon as practicable, but not later than seven (7) Days after receipt, and shall explain in writing the reasons why the payment request is not proper. Any dispute related to a payment request shall not relieve or excuse Contractor from its duty to proceed with the Work and complete the Work within the Contract Time. 7-3.2.3 Retention The City shall withhold not less than five percent (5%) from each progress payment. However, at any time after fifty percent (50%) of the Work has been completed, if the City Council finds that satisfactory progress is being made, it may, at its discretion, make any of the remaining progress payments in full for actual Work completed. The City shall withhold not less than five percent (5%) of the Contract Price from the Final Payment Amount (defined in Section 7-3.2.4) until at least thirty-five (35) days after recordation of the Notice of Completion, or recordation of a notice of acceptance or cessation, but not later than the period permitted by Public Contract Code Section 7107. 7-3.2.4 Final Invoice and Payment Whenever the Contractor shall have completely performed the Contract in the opinion of the City, the City Clerk shall be notified that the Contract has been completed in its entirety. The Contractor shall then submit to the City a written statement of the final quantities of Contract items for inclusion in the final invoice. Upon receipt of such statement, the City shall check the quantities included therein and shall authorize a payment amount, which in the City’s opinion shall be just and fair, covering the value of the total amount of Work done by the Contractor, less all previous payments and all amounts to be retained under the provisions of the Contract Documents (“Final Payment Amount”). The City shall then request that the City accept the Work and that the City Clerk be authorized to file, on behalf of the City in the office of the County Recorder, a Notice of Completion of the Work herein agreed to be done by the Contractor. In addition, the final payment will not be released until the Contractor returns the control set of Plans and Specifications showing the redlined as-built conditions. 7-3.2.5 Substitute Security In accordance with Public Contract Code Section 22300, the Contractor may request that it be permitted to substitute securities in lieu of having retention withheld by the City from progress payments when such payments become due or, in the alternative, the Contractor may request that the City make payments of earned retentions directly to an agreed upon designated escrow agent at the Contractor’s expense. If the Contractor selects either one of these alternatives, the following shall control. 7.3.2.5.1 Substitution of Securities for Performance Retention At some reasonable time before any progress payment would otherwise be due and payable to the Contractor in the performance of Work under these Contract Documents, the Contractor may submit a request to the City in writing to permit the substitution of retentions with securities equivalent to the amount estimated by the City (“estimated amount of retention”) to be withheld. 104 GP-27 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc The Contractor shall deposit such securities with the City or may, in the alternative, deposit such securities in escrow with a State or federally chartered bank in California, as the escrow agent, at the Contractor’s expense. Such securities will be the equivalent or greater in value of the estimated amount of retention. If the Contract is modified by written Modifications or Change Orders or the Contractor otherwise becomes entitled to receive an amount more than the Contract Price at the time the securities are deposited, the Contractor shall, at the request of the City, deposit with the City or escrow agent, whichever is applicable, additional securities within a reasonable time so that the amount of securities on deposit with the City or escrow agent is equivalent or greater in value than the amount of retention the City would otherwise be entitled to withhold from progress payments due or to become due to the Contractor as the Work progresses. The City shall withhold any retention amount that exceeds the security amount until the additional securities are deposited and, if the deposit is with an escrow agent, the City has confirmation from that escrow agent of the new total value of securities. Upon satisfactory completion of the Contract, which shall mean, among other things, that the City is not otherwise entitled to retain proceeds from progress payments as elsewhere provided in the Contract or under applicable law, the securities shall be returned to the Contractor. The City shall, within its sole discretion, determine whether the amount of the securities on deposit with the City or escrow agent is equal to or greater than the amount of estimated retention of progress payments that could otherwise be held by the City if the Contractor had not elected to substitute same with securities. 7-3.2.5.2 Deposit of Retention Proceeds with an Escrow Agent As an alternative to the substitution of securities, as provided above, or the City otherwise retaining and holding retention proceeds from progress payments, the Contractor may request the City to make payments of retentions earned directly to an escrow agent with the same qualifications as required in Section 7-3.2.5.1 above and at the expense of the Contractor. At its sole expense, the Contractor may direct the investment of such retention payments into only such securities as mentioned in Section 7-3.2.5.4 below and shall be entitled to interest earned on such investments on the same terms provided for securities deposited by the Contractor. Upon satisfactory completion of the Contract, which shall mean when the City would not otherwise be entitled to withhold retention proceeds from progress payments had the Contractor not elected to have such proceeds deposited into escrow, the Contractor shall be allowed to receive from the escrow agent all securities, interest and payments deposited into escrow pursuant to the terms of this Section. The Contractor shall pay to each Subcontractor, not later than ten (10) Days of receipt of payment, the respective amount of interest earned, net of costs attributed to retention withheld from each Subcontractor, on the amount withheld to ensure performance of the Contractor. 7-3.2.5.3 Subcontractor Entitlement to Interest If the Contractor elects to receive interest on any moneys withheld in retention by the City, then the Subcontractor shall receive the identical rate of interest received by the Contractor on any retention moneys withheld from the Subcontractor by the Contractor, less any actual pro rata costs associated with administering and calculating that interest. In the event that the interest rate is a fluctuating rate, the rate for the Subcontractor shall be determined by calculating the interest rate paid during the time that retentions were withheld from the Subcontractor. If the Contractor elects to substitute securities in lieu of retention, then, by mutual consent of the Contractor and the Subcontractor, the Subcontractor may substitute securities in exchange for the release of moneys held in retention by the Contractor. The Contractor shall pay each Subcontractor, not later than ten (10) Days after receipt of escrow moneys, the amount owed to each Subcontractor from the moneys plus the respective amount of interest earned, net of costs attributed to the 105 GP-28 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc retention held from each Subcontractor, on the amount of retention withheld to ensure performance of the Subcontractor. 7-3.2.5.4 Securities Eligible for Investment Securities eligible for investment shall include those listed in Government Code Section 16430, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed upon between the Contractor and the City. The Contractor shall be the beneficial owner of any securities substituted for any monies withheld and shall receive any interest thereon. 106 GP-29 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 7-3.2.5.5 Escrow Agreement for Security Deposits in Lieu of Retention The escrow agreement that shall be used for the deposit of securities in lieu of retention shall substantially conform to the form prescribed in Public Contract Code Section 22300(f). 7-3.2.5.6 Inconsistencies with Prevailing Statutory Requirements If there is any inconsistency between or differences in Public Contract Code Section 22300 and the terms of this provision, or any future amendments thereto, Section 22300 shall control. Section 7-3.9 is hereby added to Section 7-3 of Part 1 of the Standard Specifications, as follows: 7-3.4 MOBILIZATION All mobilization costs of Contractor and all subcontractors are deemed included in Contractor’s bid. This amount constitutes full compensation for all such mobilization costs, and no further payment shall be made to Contractor for costs of mobilization of Contractor or any subcontractor. The scope of Work included under Mobilizations shall include, but shall not be limited to, the following principal items: 1. Obtaining, paying for a delivering to the City all bonds, insurance, and permits 2. Moving on to the Site all Contractor’s equipment required for the first month’s operations. 3. Installing temporary construction power, wiring, and lighting facilities. 4. Establishing a fire protection system. 5. Developing and installing a construction water supply. 6. Submittal and approval of all preliminary site videos, photographs and any other existing condition surveys required. 7. Submittal and approval of the detailed list of submittals and shop drawings, and any other submittals required. 8. Providing on-site sanitary facilities and potable water facilities as specified per Cal- OSHA and these Contract Documents. 9. Posting all OSHA required notices and establishment of safety programs per Cal- OSHA. 10. Full-time presence of Contractor’s superintendent at the Site as required herein in Section 9-22. 11. Submittal and approval of the Initial Construction Schedule as required by the Contract Documents, including all necessary revisions. 12. Submittal and approval of the Contractor’s Injury and Illness Prevention Program. 107 GP-30 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 7-3.9 AUDIT The City or its representative shall have the option of inspecting and/or auditing all records and other written materials used by the Contractor in preparing its billings to the City as a condition precedent to any payment to the Contractor or in response to a construction claim or a Public Records Act (Government Code Section 6250 et seq.) request. The Contractor will promptly furnish documents requested by the City at no cost. Additionally, the Contractor shall be subject to State Auditor examination and audit at the request of the City or as part of any audit of the City, for a period of three (3) years after final payment under the Contract. The Contractor shall include a copy of this Section 7-3.9 in all contracts with its Subcontractors, and the Contractor shall be responsible for immediately obtaining those records or other written material from its Subcontractors upon a request by the State Auditor or the City. If the Project includes other auditing requirements, those additional requirements will be listed in the Special Provisions. SECTION 8 FACILITIES FOR AGENCY PERSONNEL 8-1 General No field offices for City personnel shall be required; however, City personnel shall have the right to enter upon the Project at all times and shall be admitted to the offices of the Contractor to use the telephone, desk and sanitary facilities provided by the Contractor for its own personnel. 8-7 Sanitary Facilities Contractor shall provide sanitary temporary toilet buildings and hand washing facilities for the use of all workers. All toilets and hand washing facilities shall comply with all applicable federal, state, and local laws, codes, ordinances, and regulations. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets and hand washing facilities shall be serviced no less than once weekly and shall be present in a quantity of not less than 1 per 20 workers or as required by Cal/OSHA regulations. The toilets and hand washing facilities shall be maintained in a sanitary condition at all times. Use of toilet and hand washing facilities within the Work of the Project under construction shall not be permitted. Any other Sanitary Facilities required by Cal/OSHA shall be the responsibility of the Contractor. Section 9 is hereby added to Part 1 of the Standard Specifications, as follows: SECTION 9. ADDITIONAL TERMS 9-1 NONDISCRIMINATORY EMPLOYMENT The Contractor shall not unlawfully discriminate against any individual based on race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation or military and veteran status. The Contractor understands and agrees that it is bound by and will comply with the nondiscrimination mandates of all statutes and local ordinances and regulations. 9-3 CONTRACTOR’S RESPONSIBILITY FOR WORK Until the final acceptance of the Work by the City Council in accordance with Section 3-13.2 of the General Provisions, the Contractor shall have the charge and care thereof and shall bear the 108 GP-31 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc risk of injury or damage to any part of the Work by the action of the elements, criminal acts, or any other cause. The Contractor shall rebuild, repair, restore and make good all injuries or damages to any portion of the Work occasioned by any cause before its completion and acceptance and shall bear the expense thereof, except for such injuries or damages arising from the sole negligence or willful misconduct of the City, its officers, agents or employees. In the case of suspension of Work from any cause whatever, the Contractor shall be responsible for all materials and the protection of Work already completed, shall properly store and protect them if necessary, and shall provide suitable drainage and erect temporary structures where necessary. 9-4 PROCEDURE IN CASE OF DAMAGE TO PUBLIC PROPERTY Any portions of curb, gutter, sidewalk or any other City improvement damaged by the Contractor during the course of construction shall be replaced by the Contractor at its own cost. The cost of additional replacement of any items in excess of the estimated quantities shown in the Bid form and Specifications, and found necessary during the process of construction (but not due to damage resulting from carelessness on the part of the Contractor during its operation), shall be paid to the Contractor at the unit prices submitted in his or her Bid. 9-5 REMOVAL OF INTERFERING OBSTRUCTIONS The Contractor shall remove and dispose of all debris, abandoned structures, tree roots and obstructions of any character encountered during the process of excavation. It is understood that the cost of any such removals are made a part of the unit price bid by the Contractor under the item for excavation or removal of existing Work. 9-6 SOILS ENGINEERING AND TESTING A certified materials testing firm may be retained by the City to perform materials tests during the Contractor’s entire operation to ascertain compliance with the Contract requirements. The City shall be responsible for the first series of tests. If the initial tests do not meet the Contract requirements, the Contractor shall bear the cost of all subsequent tests. If the City requires other tests or more specific requirements for testing regarding this Project, those details will be included in the Special Provisions. 9-7 ACCESS TO PRIVATE PROPERTY Unless otherwise stated in the Special Provisions, the Contractor shall be responsible for all fees and costs associated with securing permission to access private property for any portion of the Project. 9-9 CLAIM DISPUTE RESOLUTION In the event of any dispute or controversy with the City over any matter whatsoever, the Contractor shall not cause any delay or cessation in or of Work, but shall proceed with the performance of the Work in dispute. The Contractor shall retain any and all rights provided that pertain to the resolution of disputes and protests between the parties. The Disputed Work will be categorized as an “unresolved dispute” and payment, if any, shall be as later determined by mutual agreement or a court of law. The Contractor shall keep accurate, detailed records of all Disputed Work, claims and other disputed matters. 109 GP-32 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc All claims arising out of or related to the Contract Documents or this Project, and the consideration and payment of such claims, are subject to the Government Claims Act (Government Code Section 810 et seq.) with regard to filing claims. All such claims are also subject to Public Contract Code Section 9204 and Public Contract Code Section 20104 et seq. (Article 1.5), where applicable. This Contract hereby incorporates those provisions as though fully set forth herein. Thus, the Contractor or any Subcontractor must file a claim in accordance with the Government Claims Act as a prerequisite to filing a construction claim in compliance with Section 9204 and Article 1.5 (if applicable), and must then adhere to Section 9204 and Article 1.5 (as applicable), pursuant to the definition of “claim” as individually defined therein. 9-10 THIRD PARTY CLAIMS The City shall have full authority to compromise or otherwise settle any claim relating to the Project at any time. The City shall timely notify the Contractor of the receipt of any third-party claim relating to the Project. The City shall be entitled to recover its reasonable costs incurred in providing this notice. 9-11 COMPLIANCE WITH LAWS The Contractor shall comply with all applicable federal, State and local laws, ordinances, codes and regulations in force at the time the Contractor performs pursuant to the Contract Documents. 9-12 CONTRACTOR’S REPRESENTATIONS By signing the Contract, the Contractor represents, covenants, agrees, and declares under penalty of perjury under the laws of the State of California that: (a) the Contractor is licensed, qualified, and capable of furnishing the labor, materials, and expertise necessary to perform the services in accordance with the terms and conditions set forth in the Contract Documents; (b) there are no obligations, commitments, or impediments of any kind that will limit or prevent its full performance under the Contract Documents; (c) there is no litigation pending against the Contractor that could adversely affect its performance of the Contract, and the Contractor is not the subject of any criminal investigation or proceeding; and (d) to the Contractor’s actual knowledge, neither the Contractor nor its personnel have been convicted of a felony. 9-13 CONFLICTS OF INTEREST The Contractor agrees not to accept any employment or representation during the term of the Contract or within twelve (12) months after acceptance as defined in Section 3-13.2 of the General Provisions that is or may likely make the Contractor “financially interested,” as provided in Government Code Sections 1090 and 87100, in any decisions made by the City on any matter in connection with which the Contractor has been retained pursuant to the Contract Documents. 9-14 APPLICABLE LAW The validity, interpretation, and performance of these Contract Documents shall be controlled by and construed under the laws of the State of California, excluding California’s choice of law rules. Venue for any such action relating to the Contract shall be in the Superior Court with geographic jurisdiction over the City. 9-15 TIME 110 GP-33 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Time is of the essence in these Contract Documents. 9-16 INDEPENDENT CONTRACTOR The Contractor and Subcontractors shall at all times remain, as to the City, wholly independent contractors. Neither the City nor any of its officials, officers, employees or agents shall have control over the conduct of the Contractor, Subcontractors, or any of their officers, employees, or agents, except as herein set forth, and the Contractor and Subcontractors are free to dispose of all portions of their time and activities that they are not obligated to devote to the City in such a manner and to such Persons that the Contractor or Subcontractors wish except as expressly provided in these Contract Documents. The Contractor and Subcontractors shall have no power to incur any debt, obligation, or liability on behalf of the City, bind the City in any manner, or otherwise act on behalf of the City as agents. The Contractor and Subcontractors shall not, at any time or in any manner, represent that they or any of their agents, servants or employees, are in any manner agents, servants or employees of the City. The Contractor and Subcontractors agree to pay all required taxes on amounts paid to them under the Contract, and to indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by the Contract Documents. The Contractor shall include this provision in all contracts with all Subcontractors. 9-17 CONSTRUCTION In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of these Contract Documents shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Contract Documents or who drafted that portion of the Contract Documents. 9-18 NON-WAIVER OF TERMS, RIGHTS AND REMEDIES Waiver by either party of any one (1) or more of the conditions of performance under these Contract Documents shall not be a waiver of any other condition of performance under these Contract Documents. In no event shall the making by the City of any payment to the Contractor constitute or be construed as a waiver by the City of any breach of covenant, or any default that may then exist on the part of the Contractor, and the making of any such payment by the City shall in no way impair or prejudice any right or remedy available to the City with regard to such breach or default. 9-19 TERM The Contract is effective as of the Effective Date listed, and shall remain in full force and effect until the Contractor has fully rendered the services required by the Contract Documents or the Contract has been otherwise terminated by the City. However, some provisions may survive the term listed within this Section, as stated in those provisions. 111 GP-34 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 9-20 NOTICE Except as otherwise required by law, any notice or other communication authorized or required by these Contract Documents shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during the City’s regular business hours or (b) on the third (3rd) business day following deposit in the United States mail, postage prepaid, to the addresses listed on the Contractor’s Bid and City Hall, or at such other address as one party may notify the other. 9-21 SEVERABILITY If any term or portion of these Contract Documents is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of these Contract Documents shall continue in full force and effect. 9-22 CONTRACTORS SUPERVISION Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent acceptable to the City. Superintendent must be able to proficiently speak, read and write in English and shall have the authority to make decisions on behalf of the Contractor. Contractor shall continuously provide efficient supervision of the Project. 9-23 WORKERS Contractor shall at all times enforce strict discipline and good order among its employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from the Work and shall not be employed on this Project. 9-23 SUBCONTRACTORS Contractor agrees to bind every subcontractor to the terms of the Contract Documents as far as such terms are applicable to subcontractor’s portion of the work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City. The City reserved the right to accept all subcontractors. The City’s acceptance of any subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents. Prior to substituting any subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq. Formal notification of substitution of any subcontractor shall be issued to the City and does not entitle the Contractor to additional costs or time to complete the Project. 112 GP-35 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 9-24 MATERIALS Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities of every nature whatsoever necessary to execute and complete this Contract within specified time. Unless otherwise specified, all materials shall be new and the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work until the City has accepted the Work. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges. Materials shall be stored on the Project site in such manner so as not to interfere with any operations of the City or any independent contractor. Contractor shall verify all measurements, dimensions, elevations, and quantities before ordering any materials or performing any Work, and the City shall not be liable for Contractor’s failure to so. No additional compensation, over and above payment for the actual quantities at the prices set out in the Bid Form, will be allowed because of differences between actual measurements, dimension, elevations and quantities and those indicated on the Plans and in the Specifications. Any difference therein shall be submitted to the City for consideration before proceeding with the Work. 9-25 TRAFIC CONTROL Traffic control plan(s) for the Work may be required by the Agency(s) of Jurisdiction. Traffic control plans, if required, shall be prepared at Contractor’s expense, in accordance with the requirements of the Agency(s) of Jurisdiction. Costs for preparation of any required traffic control plans or implementation of any traffic control requirements that may be required, shall be included in the Contractor’s bid. All warning signs and safety devices used by the Contractor to perform the Work shall conform to the requirements contained in the State of California, Department of Transportation’s current edition of “Manual of Traffic Controls for Construction and Maintenance Work Zones” or to the requirements of the local agency. The Contractor shall also be responsible for all traffic control required by the agency having jurisdiction over the project on the intersecting streets. Contractor must submit a traffic control plan to the agency having jurisdiction over the project for approval prior to starting work, if required. The Contractor’s representative on the site responsible for traffic control shall produce evidence that he/she has completed training acceptable to the California Department of Transportation for safety through construction zones. All of the streets in which the Work will occur shall remain open 113 GP-36 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc to traffic and one lane of traffic maintained at all times unless otherwise directed by the agency of jurisdiction. Businesses and residences adjacent to the Work shall be notified at least forty-eight (48) hours in advance of closing of driveways. The Contractor shall make every effort to minimize the amount of public parking temporarily eliminated due to construction in areas fronting businesses. No stockpiles of pipe or other material will be allowed in traveled right-of-ways after working hours unless otherwise approved by the Engineer. 9-26 AIR POLUTION CONTROL Contractor shall comply with all air pollution control rules, regulations, ordinances and statues. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements. 9-27 CONTRACTOR’S MEANS AND METHODS Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards. 9-28 DOCUMENT RETENTION & EXAMINATION In accordance with Government Code Section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment. Contractor shall make available to the City any of the Contractor’s other documents related to the Work immediately upon request of the City. In addition to the State Auditor’s rights described above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including electronic records, computations and projections) related to negotiating, pricing, or performing the Work in order to evaluate the accuracy and completeness of the cost or pricing data, for a period of four (4) years after final payment. 114 SP-1 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc SPECIAL PROVISIONS The Sections that follow supplement, but do not replace, the corresponding provisions in Part 3 (Construction Methods) and Part 4 (Existing Improvements) of the Standard Specifications, except as otherwise indicated herein. In the event of any conflict between the Standard Specifications and these Special Provisions, these Special Provisions shall control. SECTION 306 - OPEN TRENCH CONDUIT CONSTRUCTION 306-3.1 GENERAL Pursuant to Public Contract Code Section 7104, if the project involves trenching more than four (4) feet deep, Contractor shall promptly and before the following conditions are disturbed notify the City in writing of any: a. Material that Contractor believes may be material that is hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; and/or b. Subsurface or latent physical conditions at the site differing from those indicated; and/or c. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract. d. As required by Labor Code Section 6705 and in addition thereto, whenever work under the Contract that involves an estimated expenditure in excess of twenty-five thousand dollars ($25,000) for the excavation of any trench or trenches five (5) feet or more in depth, Contractor shall submit for acceptance by City in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards established by the Construction Safety Orders of the Division of Industrial Safety, the plan shall be prepared by a registered civil or structural engineer employed by Contractor, and all costs therefor shall be included in the price of the Contract. Nothing in this provision shall be deemed to allow the use of a shoring, sloping, or other protective system less effective than that required by the Construction Safety Orders. Nothing in this provision shall be construed to impose tort liability on the City or on any City officer, agent, consultant, representative, or employee. All plans, processing and shoring costs are Contractor’s responsibility and must be included in Contractor’s bid. The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the Work, shall issue a change order under the procedures described in the Contract Documents. In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with 115 SP-2 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties. SECTION 400 - PROTECTION AND RESTORATION 400-1 GENERAL All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or reestablishing existing improvements shall be included in the Bid. SECTION 402 - UTILITIES 402-1 LOCATION The location and existence of any underground Utility or substructure has not been obtained. The methods used and costs involved to locate existing elements, points of connection and all construction methods are the Contractor’s sole responsibility. Accuracy of information furnished, as to existing conditions, is not guaranteed by the City. The Contractor, at its sole expense, must make all investigations necessary to determine locations of existing elements, which may include contacting Underground Service Alert and other private underground locating firm(s), utilizing specialized locating equipment, hand trenching, or both. For every Dig Alert Identification Number issued by Underground Service Alert during the course of the Project, the Contractor must submit to the City the following form. The Contractor shall be responsible for preserving the integrity of the existing underground utilities at the site. 116 SP-3 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER FORM No excavation will be permitted until this form is completed and returned to the City. Government Code Section 4216 et seq. requires a Dig Alert Identification Number to be issued before a permit to excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 811 a minimum of three (3) Working Days before scheduled excavation. For best response, provide as much notice as possible up to ten (10) Working Days. Dig Alert Identification Number: ________________________________________________ Dated: (“CONTRACTOR”) By: Printed Name: Title: By: Printed Name: Title: Note: This form is required for every Dig Alert Identification Number issued by Underground Service during the course of the Work. Additional forms may be obtained from the City upon request. 117 SP-4 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc 402-1.3 Entry by Utility Owners The right is reserved to the owners of public Utilities or franchises to enter the Project site for the purpose of making repairs or changes in their property that may be necessary as a result of the Work as well as any other reason authorized by the City. When the Contract Documents provide for the Utility owners to alter, relocate or reconstruct a Utility, or when the Contract Documents are silent in this regard and it is determined by the City that the Utility owners must alter, relocate or reconstruct a Utility, the Contractor shall schedule and allow adequate time for those alterations, relocations or reconstructions by the respective Utility owners. City employees and agents shall likewise have the right to enter upon the Project site at any time and for any reason or no reason at all. 402-2 PROTECTION If Contractor damages or breaks the Utilities, it will be the Contractor’s responsibility to repair the Utility at no cost to the Utility or the City. 402-3 REMOVAL Facilities encountered during the prosecution of the Work that are determined to be abandoned shall be removed by the Contractor as required for the Work, unless directed otherwise by the City. The remaining portion of the existing Utility which is left in place shall be accurately recorded, in elevation and plan, on the control set of Contract Drawings. 402-4 RELOCATION The Contractor shall cooperate fully with all Utility forces of the City or forces of other public or private agencies engaged in the relocation, altering, or otherwise rearranging of any facilities that interfere with the progress of the Work. The Contractor shall schedule the Work so as to minimize interference with the relocation, altering, or other rearranging of facilities. Temporary or permanent relocation or alteration of utilities desired by the Contractor for its own convenience shall be the Contractor’s responsibility and it shall make arrangements and bear all costs for such work. 402-6 COOPERATION The Contractor’s attention is directed to the fact that Work may be conducted at or adjacent to the site by other contractors during the performance of the Work under this Contract. The Contractor shall conduct its operations so as to cause a minimum of interference with the work of such other contractors, and shall cooperate fully with such contractors to provide continued safe access to their respective portions of the site, as required to perform work under their respective contracts. Compensation for compliance shall be included in the various items of the Work, and no additional compensation shall be allowed therefor. 402-7 NOTIFICATION The Contractor shall notify the City and the owners of all Utilities and substructures not less than forty-eight (48) hours before starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or accurate: 118 SP-5 Richards, Watson & Gershon - 2020 12853-0019\2476738v1.doc Agency: Phone Number: Contact Person: Agency: Phone Number: Contact Person: Agency: Phone Number: Contact Person: 119 APPENDIX I CITY HOLIDAYS – 2023 120 Rev. 10/21/2022 CITY HOLIDAYS – 2023 January New Year’s Day (observed) Monday, Jan. 2 Martin Luther King, Jr. Day Monday, January 16 February Presidents Day Monday, February 20 March Cesar Chavez Day Friday, March 31 May Memorial Day Monday, May 29 July Independence Day Extended Monday, July 3 Independence Day Holiday Tuesday, July 4 September Labor Day Monday, September 4 November Veterans Day Friday, November 10 Thanksgiving Day Thursday, November 23 Extended Thanksgiving Holiday Friday, November 24 December Christmas Holiday (observed) Monday, December 25 January 2024 2024 New Year’s Day (observed) Monday, Jan. 1 ,;_ . , ; ; .~ .. ~ o: -¾ , - , . ,J I~ ~ ~ ,~ , \, ~ ~ f ; . , ' ,, ,- .0, . , ~ y 121 APPENDIX II CONSTRUCTION PLAN SET 122 Architectural Plans (115 Sheets), pages 120 to 234 of the Agreement are omitted pursuant to Senate Bill 1214 and are available for public inspection at Moorpark City Hall, Community Development Department 123 APPENDIX III TECHNICAL SPECIFICATIONS 124 PROJECT MANUAL INCLUDING SPECIFICATIONS FOR MOORPARK CITY HALL TENANT IMPROVEMENT 323 Science Dr. Moorpark, CA 93021 ARCHITECT SVA ARCHITECTS 6 Hutton Centre Drive, Suite 1150 Santa Anna, CA 92707 Telephone: 949.809.3380 SVA Project Number: 2022-40110 June 08, 2023 125 MOORPARK CITY HALL TENTANT IMPROVEMENT 06/12/2023 MOORPARK, CALIFORNIA 00 01 10 - 1 Table of Contents SECTION 00 01 10 TABLE OF CONTENTS PROJECT MANUAL INTRODUCTORY INFORMATION Document 00 01 10 Table of Contents SPECIFICATIONS GROUP DIVISION 01 – GENERAL REQUIREMENTS Section 01 11 00 Summary of Work 01 23 00 Alternates 01 25 00 Substitution Procedures 01 30 00 Administrative Requirements 01 31 00 Project Management and Coordination 01 31 10 Request For Information (RFI) 01 35 15 CALGreen Environmental Requirements 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 56 39 Temporary Tree and Plant Protection 01 60 00 Product Requirements 01 70 00 Execution Requirements 01 73 00 Cutting and Patching 01 74 10 Waste Management 01 77 00 Closeout Procedures 01 78 00 Warranties 01 79 00 Demonstration and Training DIVISION 02 – EXISTING CONDITIONS Section 02 41 20 Selective Building Demolition DIVISION 03 – CONCRETE Section 03 54 10 Gypsum Underlayment 03 10 00 Concrete Formwork 126 MOORPARK CITY HALL TENTANT IMPROVEMENT 06/12/2023 MOORPARK, CALIFORNIA 00 01 10 - 2 Table of Contents 03 20 00 Concrete Reinforcement 03 30 00 Cast-in-Place Concrete DIVISION 04 – MASONRY Section 04 22 70 Concrete Unit Masonry DIVISION 05 – METALS Section 05 12 00 Structural Steel 05 30 00 Metal Decking 05 40 00 Cold Formed Metal Framing 05 50 00 Metal Fabrications DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES Section 06 10 50 Miscellaneous Rough Carpentry 06 18 00 Structural Glued-Laminated Timber 06 20 00 Finish Carpentry 06 40 00 Architectural Woodwork DIVISION 07 – THERMAL AND MOISTURE PROTECTION Section 07 18 00 Traffic Coating - Urethane 07 19 00 Water Repellent 07 21 00 Thermal Insulation 07 26 00 Below-Grade Vapor Retarder 07 28 00 Weather Barrier Underlayment 07 52 00 Modified Bituminous Membrane Roofing 07 60 00 Flashing and Sheet Metal 07 72 00 Roof Hatches 07 84 00 Firestopping 07 90 00 Joint Sealants DIVISION 08 – OPENINGS Section 08 11 10 Hollow Metal Doors and Frames 08 11 20 Interior Aluminum Frames 08 14 00 Wood Doors - Flush 08 17 00 Integrated Door Opening Assemblies 08 31 00 Access Doors and Panels 08 41 00 Entrances and Storefronts 08 62 23 Tubular Daylighting Devices 08 71 00 Door Hardware 08 80 00 Glazing 08 83 00 Frameless Mirrors 127 MOORPARK CITY HALL TENTANT IMPROVEMENT 06/12/2023 MOORPARK, CALIFORNIA 00 01 10 - 3 Table of Contents DIVISION 09 – FINISHES Section 09 21 00 Gypsum Board Assemblies – Metal Framing 09 24 00 Portland Cement Plaster 09 30 00 Tiling 09 51 00 Acoustical Ceilings 09 65 10 Resilient Base 09 65 20 Resilient Tile Flooring 09 68 00 Carpeting - Adhered 09 68 10 Tile Carpeting 09 72 10 Vinyl-Coated Fabric Wall Covering 09 77 20 Fabric Wrapped Panels 09 90 00 Painting and Coating DIVISION 10 – SPECIALTIES Section 10 14 00 Signage 10 21 20 Phenolic Toilet Compartments 10 28 00 Toilet Accessories 10 44 00 Fire Extinguisher Cabinets 10 75 00 Metal Flagpoles DIVISION 11 – EQUIPMENT Not used DIVISION 12 – FURNISHINGS Section 12 93 00 Site Furnishings DIVISION 13 – SPECIAL CONSTRUCTION Not used. DIVISION 14 – CONVEYING EQUIPMENT Not used DIVISION 21 – FIRE SUPPRESSION Section 21 05 00 - Basic Fire Suppression Requirements 128 MOORPARK CITY HALL TENTANT IMPROVEMENT 06/12/2023 MOORPARK, CALIFORNIA 00 01 10 - 4 Table of Contents 21 05 03 - Through Penetration Firestopping 21 05 05 - Fire Suppression Demolition For Remodeling 21 05 29 - Fire Suppression Supports And Anchors 21 05 50 - Seismic Requirements For Equipment And Supports 21 05 53 - Fire Suppression Identification 21 13 00 - Fire Protection Systems 21 22 00 - Clean Agent Fire Suppression System DIVISION 22 - PLUMBING 22 05 00 - Basic Plumbing Requirements 22 05 03 - Through Penetration Firestopping 22 05 05 - Plumbing Demolition For Remodeling 22 05 29 - Plumbing Supports And Anchors 22 05 53 - Plumbing Identification 22 07 19 - Plumbing Piping Insulation 22 09 00 - Instrumentation 22 10 00 - Plumbing Piping 22 10 30 - Plumbing Specialties 22 40 00 - Plumbing Fixtures DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING(HVAC) Section 23 05 00 - Basic Hvac Requirements Section 23 05 03 - Through Penetration Firestopping Section 23 05 05 - Hvac Demolition For Remodeling Section 23 05 13 - Motors Section 23 05 29 - Hvac Supports And Anchors Section 23 05 53 - Hvac Identification Section 23 05 93 - Testing, Adjusting, And Balancing Section 23 07 13 - Ductwork Insulation Section 23 07 19 - Hvac Piping Insulation Section 23 09 05 - Small Equipment Controls Section 23 31 00 - Ductwork Section 23 33 00 - Ductwork Accessories Section 23 34 23 - Power Ventilators Section 23 37 00 - Air Inlets And Outlets Section 23 40 00 - Air Cleaning Section 23 74 16.12 - Packaged Rooftop Air Conditioning Units 25 Ton And Below Section 23 81 26 - Split System Air Conditioning Units DIVISION 26 - ELECTRICAL Section 26 05 00 - Basic Electrical Requirements Section 26 05 03 - Through Penetration Firestopping Section 26 05 05 - Electrical Demolition For Remodeling Section 26 05 13 - Wire and Cable Section 26 05 26 - Grounding and Bonding Section 26 05 27 - Supporting Devices 129 MOORPARK CITY HALL TENTANT IMPROVEMENT 06/12/2023 MOORPARK, CALIFORNIA 00 01 10 - 5 Table of Contents Section 26 05 33 - Conduit And Boxes Section 26 05 53 - Electrical Identification Section 26 05 73 - Power System Study Section 26 09 16 - Electrical Controls And Relays Section 26 09 33 - Lighting Control Systems Section 26 24 16 - Panelboards Section 26 27 16 - Cabinets And Enclosures Section 26 27 26 - Wiring Devices Section 26 28 13 - Fuses Section 26 28 16 - Disconnect Switches Section 26 32 13 - Packaged Engine Generator Systems Section 26 36 00 - Transfer Switch Section 26 51 19 - Led Lighting DIVISION 27 - COMMUNICATIONS Section 27 05 00 - Basic Communications Systems Requirements Section 27 05 03 - Through Penetration Firestopping Section 27 05 26 - Communications Bonding Section 27 05 28 - Interior Communication Pathways Section 27 05 53 - Identification and Administration Section 27 11 00 - Communication Equipment Rooms (Cer) Section 27 13 00 - Backbone Cabling Requirements Section 27 15 00 - Horizontal Cabling Requirements Section 27 17 10 - Testing Section 27 41 00 - Professional Audio/Video System DIVISION 28 - ELECTRONIC SAFETY AND SECURITY Section 28 05 00 - Basic Electronic Safety and Security System Requirements Section 28 05 03 - Through Penetration Firestopping Section 28 13 00 - Electronic Access Control Section 28 23 00 - Video Surveillance Section 28 26 05 - Rescue Assistance Communication Section 28 31 00 - Fire Alarm And Detection Systems DIVISION 31 – EARTHWORK Section 31 10 00 Site Clearing 31 11 00 Clearing and Grubbing 31 22 00 Grading 31 23 13 Excavation and Fill 31 23 16 Excavation and Fill Paving 31 23 19 Excavation Fill Structures 31 23 23 Excavation and Fill for Utilities 31 23 26 Base Course 31 31 19 Vegetation Control 130 MOORPARK CITY HALL TENTANT IMPROVEMENT 06/12/2023 MOORPARK, CALIFORNIA 00 01 10 - 6 Table of Contents DIVISION 32 – EXTERIOR IMPROVEMENTS Section 32 01 13 Rolled Slurry Seal Existing Pavement 32_0117 Asphalt Pavement Repair 32 01 90 Operation and Maintenance 32 12 16 Asphalt Paving 32 12 36 Seal Bituminous Surfacing 32 13 13 Site Concrete Work 32 17 00 Parking Bumpers 32 17 20 Tactile Warning Surfaces 32 84 00 Landscape Irrigation 32 93 00 Landscape Planting 32 93 01 Tree Pruning DIVISION 33 –UTILITIES Not used END OF SECTION 131 MOORPARK CITY HALL TENANT IMPROVEMENT 06/08/2023 MOORPARK, CALIFORNIA 01 11 00 - 1 Summary of Work SECTION 01 11 00 SUMMARY OF WORK PART 1 - GENERAL 1.1 SUMMARY A. Project consists of the remodel of the existing 2-story commercial office building at 323 Science Drive, Moorpark, into the new city hall for the City of Moorpark. The program includes office space for city staff, staff support spaces, a public counter and lobby, a city council chamber and other associated spaces. a. The project includes site work as indicated for base scope and site work as additive alternates, as specified in alternates section. b. The project includes new roofing, new HVAC systems, an emergency generator, and other building infrastructure improvements as indicated. 2. Owner reserves right to remove and retain possession of existing items prior to start of Contract. 3. Removal of hazardous material shall be per provided hazardous material abatement report prepared by others. Removal and disposal of hazardous materials is the responsibility of the abatement contractor. 1.2 REQUIREMENTS INCLUDED A. This section includes administrative provisions: 1. Work sequence. 2. Contractors use of premises. 3. Building occupancy. 4. Field engineering. 5. Lines and levels. 6. Regulatory requirements and reference standards. 7. Owner furnished Contractor installed products (OFCI). 8. Owner pre-ordered products. 1.3 WORK SEQUENCE A. Coordinate construction schedule and operations with Owner and Architect. 1. Construct Work to accommodate Owner's occupancy requirements during construction period. B. Perform construction in phases as indicated. 132 MOORPARK CITY HALL TENANT IMPROVEMENT 06/08/2023 MOORPARK, CALIFORNIA 01 11 00 - 2 Summary of Work 1.4 CONTRACTORS USE OF PREMISES A. Limit use of premises for Work and construction operations and to allow for: 1. Building occupancy. 2. Work by other contractors. 3. Authorized access to restricted areas. 4. Public access to public areas. B. Coordinate use of premises and access to site under direction of Owner or Architect. 1.5 BUILDING OCCUPANCY A. Building is un-occupied during construction. 1.6 FIELD ENGINEERING A. Provide field engineering services; establish lines and levels by use of recognized engineering survey practices. B. Locate and protect control and reference points. 1.7 LINES AND LEVELS A. Establish lines and levels by use of recognized engineering practices. B. Locate and protect control and reference points. 1.8 REGULATORY REQUIREMENTS AND REFERENCE STANDARDS A. Regulatory Requirements: 1. Architect has contacted governing authorities and reviewed design requirements of local, state and federal agencies for applicability to Project. 2. Contractor shall be responsible for contacting governing authorities directly for necessary information and decisions bearing upon performance of Work. B. Reference Standards: 1. For Products specified by association or trade standards, comply with requirements of referenced standard, except when more rigid requirements are specified or are required by applicable codes. 2. Applicable date of each standard is that in effect as of date on proposal or date on Contract where no proposal is available, except when a specific date is specified. 1.9 OWNER FURNISHED CONTRACTOR INSTALLED PRODUCTS (OFCI) A. Select products are to be furnished and paid for by Owner and installed by Contractor: 1. Refer to Drawings and Specifications. 133 MOORPARK CITY HALL TENANT IMPROVEMENT 06/08/2023 MOORPARK, CALIFORNIA 01 11 00 - 3 Summary of Work B. Owner's Responsibilities: 1. Arrange for and deliver shop drawings, product data, and samples to Contractor. 2. Arrange and pay for product delivery to site. 3. Inspect products jointly with Contractor on delivery. 4. Submit claims for transportation damage. 5. Arrange for replacement of damaged, defective, or missing items. 6. Arrange for manufacturer's warranties, inspections, and service. C. Contractor's Responsibilities: 1. Review shop drawings, product data, and samples. 2. Receive and unload products at site. 3. Inspect jointly with Owner for completeness and damage. 4. Handle, store, and install products. 5. Finish products as required after installation. 6. Repair or replace items damaged by Work of this Contract. 1.10 OWNER PRE-ORDERED PRODUCTS A. Select products have been pre-ordered by Owner: 1. Refer to Drawings. B. Owner has negotiated purchase orders for these products for incorporation into Project. 1. Purchase orders are assigned to Contractor; costs shall be included into base bid. 2. Contractor's responsibilities are same as if Contractor negotiated purchase orders. END OF SECTION 134 MOORPARK CITY HALL TENANT IMPROVEMENT 06/08/2023 MOORPARK, CALIFORNIA 01 23 00 - 1 Alternates SECTION 01 23 00 ALTERNATES PART 1 - GENERAL 1.1 SUMMARY A. This section includes a description of alternate work. B. Related Requirements: 1. Pricing Documents: Quotation of cost of each alternate. 2. Owner-Contractor Agreement: Alternates accepted by Owner for incorporation into the Work. 3. Sections of Specifications identified in each Alternate. 1.2 PROCEDURES A. Alternates will be exercised at Owner's option. B. Coordinate Related Work: and modify surrounding work as required to complete Work, including changes under each alternate, when acceptance is designated in Owner-Contractor Agreement. 1.3 ALTERNATES A. Alternate No. 1: Slurry Seal entire parking lot and stripe all parking stalls. 1. Additive cost: This scope is in addition to the parking lot repairs indicated on civil drawings which define limited areas for sealing and striping as part of the base contract. B. Alternate No. 2: Landscape and Irrigation as indicated in L series Drawings. 1. Additive cost for landscaping and irrigation. a. (Hardscape and features such as the flagpoles and site furnishings are part of the base scope) END OF SECTION 135 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 25 00 - 1 Substitution Procedures SECTION 01 25 00 SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. General: Procedures are described for requesting substitution of unlisted materials in lieu of materials named in Specifications or approved for use in addenda. 1. Provide products listed in Contract Documents, products by manufacturers listed in Contract Documents, and products meeting specified requirements. a. Contract Amount: Base on materials and products included in Contract Documents. b. Where materials and products are listed in Contract Documents, materials and products by manufacturers not listed shall not be used without Owner’s and Architect’s approval of Contractor's written request for substitution. 2. Purpose: After bidding, substitutions will only be considered where Owner will receive financial benefit or because specified materials are no longer available due to no fault of Contractor. 3. Purpose: Substitutions will only be considered where Owner will receive benefit or because specified materials are no longer available due to conditions beyond Contractor control. a. Owner benefits either from a Contractor proposed reduction of the Contract amount or from a reduction in Contract time based on acceptance of proposed substitution. b. List proposed cost or time reductions on request for substitution. c. Requests not including a proposed cost or time reduction will not be considered unless Contractor submits supporting information indicating specified materials are not available. B. Related Sections: 1. Section 01 60 00: Product requirements. 1.2 SUBSTITUTIONS A. Within a period of 35 days after award of Contract, Owner and Architect will consider formal requests for substitutions only from Contractor as specified in 1.1 Summary. 1. Owner and Architect will consider only one request for substitution for each material; where requests are denied Contractor shall be required to provide specified materials. 136 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 25 00 - 2 Substitution Procedures 2. After initial 35-day period, requests will be considered only when a product becomes unavailable through no fault of Contractor; more than one request for substitution will be considered if necessary. B. Prior to submittal of second Request for Payment Owner and Architect will consider formal requests for substitutions from Contractor as specified in 1.1 Summary. 1. Owner and Architect will consider only one request for substitution for each material; where requests are denied Contractor shall be required to provide specified materials. 2. After payments begin, requests will be considered only when a product becomes unavailable through no fault of Contractor; more than one request for substitution will be considered if necessary. C. Submit each request with sequentially numbered “Substitution Request Transmittal” acceptable to Owner and Architect; submit separate request for each product and support each request with: 1. Product identification with manufacturer's literature and samples where applicable. 2. Name and address of similar projects on which product has been used, and date of installation. D. Submit itemized comparison of proposed substitution with product specified and list significant variations. E. Submit data relating to changes in construction schedule. F. Note effect of substitution on other work, products, or separate contracts. 1. Note if acceptance of substitution could require revision of Contract Documents, Drawings, details or Specifications. G. Include accurate cost data comparing proposed substitution with product and amount of net change in Contract price. 1. Include costs to other contractors and costs for revisions to Drawings, details or Specifications. H. Substitutions will not be considered for acceptance when: 1. They are indicated or implied on submittals without a formal request from Contractor. 2. They are requested directly by a subcontractor or supplier. 3. Acceptance will require substantial revision of Contract Documents. I. Substitute products shall not be ordered without written acceptance of Owner and Architect. 137 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 25 00 - 3 Substitution Procedures J. Owner and Architect will determine acceptability of proposed substitutions and reserves right to reject proposals due to insufficient information. 1.3 CONTRACTOR'S REPRESENTATION A. Requests constitute a representation that Contractor: 1. Has investigated proposed product and determined it meets or exceeds, in all respects, specified product. 2. Will provide same warranty or longer warranty for substitution as for specified product. 3. Will coordinate installation and make other changes that may be required for Work to be complete in all respects. 4. Waives claims for additional costs that subsequently become apparent. 5. Will pay costs of changes to Contract Documents, Drawings, details and Specifications required by accepted substitutions. 1.4 ARCHITECT'S DUTIES A. Review Contractor's requests for substitutions with reasonable promptness. 1. Architect will recommend that Owner accept or reject substitution request. 2. Upon request, Architect will provide cost for changes to Contract Documents, Drawings, details and Specifications required for substitutions. B. Notify Contractor in writing of decision to accept or reject requested substitution. 138 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 25 00 - 4 Substitution Procedures CONTRACTOR'S SUBSTITUTION REQUEST (Use separate form for each request) Date: Request No.: TO: Architect Date:__________ PROJECT: Project No.: CONTRACTOR SPECIFIED ITEM: Section: Page: Paragraph: Description: Drawing Number(s): Detail Number(s): The undersigned request consideration of the following: PROPOSED SUBSTITUTION: REASON FOR NOT GIVING PRIORITY TO SPECIFIED ITEMS: SAVINGS or CREDIT to OWNER for ACCEPTING SUBSTITUTE: $ PROJECT COMPLETION CHANGE for ACCEPTING SUBSTITUTE Days Attached data includes description, specifications, drawings, photographs, performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified. Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation. The undersigned certifies that the following paragraphs, unless modified by attachments, are correct: 1. Proposed substitution has been fully checked and coordinated with the Contract Documents. 2. The proposed substitution does not affect dimensions shown on Drawings. 3. The proposed substitution does not require revisions to mechanical or electrical work. 4. The undersigned will pay for changes to the building design, including architectural and engineering design, detailing, and construction costs caused by the requested substitution. 5. The proposed substitution will have no adverse effect on other trades, construction schedule, or warranty. 6. Maintenance and service parts will be locally available for the proposed substitution. 7. The proposed substitution will have no adverse effect on LEED credits (applies to LEED Projects ONLY) 8. The proposed substitution will have no adverse effect on Green Building Requirements where applicable. The undersigned further states that the function, appearance, and quality of the proposed substitution are equivalent or superior to the specified item. Attachments: The attached data is furnished herewith for evaluation of the proposed substitution. Catalog Drawings Samples Reports Tests Other: Submitted by: (Name of Authorized Representative) (Authorized Legal Signature) ( ) (Firm) (Telephone) For use by the Architect: Accepted Accepted as Noted  Rejected: Submit Specified Item    BY: (Authorized Signature) Date: Remarks: END OF SECTION 139 MOORPARK CITY HALL TENANT IMPROVEMENT 06/09/2023 MOORPARK, CALIFORNIA 01 30 00 - 1 Administrative Requirements SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. This section describes general procedural requirements for ongoing submittals. 1. Schedule of values. Per front end documents. 2. Product data and manufacturer’s literature. 3. Shop drawings. 4. Samples. 5. Manufacturers' certificates. 6. Excess materials and attic stock. 7. Design build (delegated design) procedures. 8. Deferred approval requirements. B. Related Requirements: 1. Section 01 31 00: Project management and coordination. 2. Section 01 32 00: Construction Schedule – Network Analysis. 3. Section 01 40 00: Quality Requirements 4. Section 01 70 00: Execution Requirements 5. Section 01 77 00: Closeout requirements including Project Record Documents. 6. Section 01 78 00: Warranties. 1.2 GENERAL SUBMITTAL PROCEDURES A. Where conflicts exist between this section and front end documents, section 3-8, section 3-8 shall take precedence. B. Submittals: Transmit each item using form approved by Owner; submit sample to Owner for approval prior to use. 1. Identify Project, Contractor, subcontractor, major supplier. a. Attach sequential identification number for each new submittal. b. Identify each resubmittal using original submittal number and sequential identification clearly indicating item is resubmitted. 2. Identify pertinent Drawing sheet and detail number, and Specification section number as appropriate. 3. Identify deviations from Contract Documents. 4. Provide space for Contractor and Architect review stamps. 140 MOORPARK CITY HALL TENANT IMPROVEMENT 06/09/2023 MOORPARK, CALIFORNIA 01 30 00 - 2 Administrative Requirements 5. Contractor: Review and stamp submittals from subcontractors prior to submitting to Owner. a. Review submittals and indicate where conflicts occur with Contract Documents and with work of other subcontractors. b. Return submittals, to sub contractors, that vary from Contract Documents for correction and resubmittal prior to submitting to Owner. c. Submittals that vary from Contract Documents and that fail to indicate thorough Contractor review prior to submission to Owner will be returned without review. d. Cursory review and stamping of subcontractor submittal by Contractor shall not be acceptable. C. Initial Schedules: Submit initial progress schedule and schedule of value in duplicate within 15 working days after award of Contract. 1. After review by Owner and Architect revise and resubmit where required. D. Comply with progress schedule for submittals related to Work progress. Coordinate submittal of related items. E. After Architect review of submittal, revise and resubmit as required, identify changes made since previous submittal. F. Distribute copies of reviewed submittals to concerned persons. Instruct recipients to promptly report any inability to comply. 1.3 TYPES OF SUBMITTALS A. General: Project requires various types of submittals to maintain communications, minimize misunderstandings, avoid unnecessary conflicts, and to ensure complete documentation for Project Record Documents. 1. Maintain complete set of submittals including required revisions. B. Construction Schedules: Submit construction progress schedules for Design Team and Owner review and to maintain entire team up-to-date on construction activities. C. Schedule of Values: Submit Schedule of Values indicating division of Work, subcontractors to perform work, products being used, and values attributed to each to inform Design Team and Owner. D. Action Submittals: Submittals relating to product data and manufacturer’s literature, shop drawings, and samples for Design Team review and comment; do not begin fabrication, delivery, or installation until Design Team review is complete. 141 MOORPARK CITY HALL TENANT IMPROVEMENT 06/09/2023 MOORPARK, CALIFORNIA 01 30 00 - 3 Administrative Requirements E. Information Submittals: Submittals relating to certifications, qualifications, reports, including test reports, and instructions are for information; Design Team may choose to comment but action is not generally anticipated. 1. Manufacturer installation instructions and recommendations shall be considered information submittals. F. Design/Build Submittals: Where portion of Work requires design by specialized professionals submit information necessary to ensure work complies with Contract Documents along with certifications signed by qualified professional. 1. Calculations: Do not submit calculations unless specifically required by Contract Documents or required by applicable authorities directly to applicable authorities: a. Submit certification by qualified professional indicating required calculations have been prepared and work conforms to Contract Documents and applicable codes and regulations. G. Maintenance Materials Submittals: Compile maintenance information and materials during Work to ensure complete set of documents, maintenance manuals, and operation instructions. H. Closeout Submittals: Compile closeout submittals, organize, and submit to Owner prior to or at time of Substantial Completion. Project will not be considered Substantially Complete until closeout submittals have been received by Owner. I. Material Safety Data Sheets (MSDS): 1. Submittals, or portions thereof, that include material safety data sheets will be returned for without review. 1.4 SCHEDULE OF VALUES 1. Format per front end documents. 1.5 PRODUCT DATA/MANUFACTURERS' LITERATURE A. Action Submittals: Mark each copy to identify applicable Products, models, options, and other data; supplement manufacturers' standard data to provide information unique to the Work. B. Information Submittals: Include manufacturers' installation instructions only when required by Specifications or specifically requested by Owner. 1. Maintain copy of manufacturer installation instructions and recommendations in Contractor's field office for review. C. Product data shall be submitted as electronic PDF files unless otherwise noted or approved by Owner in advance. 142 MOORPARK CITY HALL TENANT IMPROVEMENT 06/09/2023 MOORPARK, CALIFORNIA 01 30 00 - 4 Administrative Requirements 1. Where paper copies are permitted submit number of copies Contractor requires, plus one copy to be retained by Owner. D. Submit number of copies Contractor requires, plus one copy to be retained by Owner. 1.6 SHOP DRAWINGS A. Shop drawings shall be submitted as electronic PDF files unless otherwise noted or approved by Owner in advance. 1. Where prints are permitted submit one reproducible print; minimum sheet size 8-1/2” by 11”. B. Shop drawings shall be submitted in pdf format for owner and architect review. 1. Prints: Submit printed to paper shop drawings where required for deferred approval submittals to AHJs. 1.7 SAMPLES A. Submit full range of manufacturers' standard colors, textures, and patterns for Owner's selection where substitutions are proposed. B. Where submitting a specified product, submit 1 sample. C. Coordinate submittal of different categories for interfacing work. D. Include identification on each sample, giving full information. E. Submit number of samples required by Contractor plus one to be retained by Owner. 1. Maintain one set of approved samples at Project Field Office. F. Sizes: Provide following sizes unless otherwise specified. 1. Flat or Sheet Products: Minimum 6" square, maximum 12" by 12". 2. Linear Products: Minimum 6", maximum 12" long. 1.8 MANUFACTURERS' CERTIFICATES A. Submit certificates, in duplicate in accordance with requirements of each Specification section. 1.9 EXCESS MATERIALS AND ATTIC STOCK A. Excess Materials: Excess materials shall be considered property of Owner; inform Owner of extent of excess materials and methods required for handling and storage; remove from site excess materials not required by Owner for maintenance stock. B. Attic Stock: Owner may choose to obtain additional attic stock for maintenance purposes where excess materials are not considered adequate. 143 MOORPARK CITY HALL TENANT IMPROVEMENT 06/09/2023 MOORPARK, CALIFORNIA 01 30 00 - 5 Administrative Requirements 1. Owner may requires extra materials for maintenance purposes. Exact amount of each material scheduled below: a. Carpet Tile: 400 s.f. b. Ceramic Tile: 2 boxes floor tile, 1 box wall tile. c. Ceiling Tile: 100 s.f. of standard. (10) 2x2 panels of geometrix tile. d. Paint: Provide color codes for each color. 2. Meeting: Conduct meeting prior to beginning Work to discuss process for transfer of material to owner. a. Assist Owner in determining where on-site or off-site additional attic stock for maintenance purposes will be delivered and stored. 3. Final Completion: Ensure attic stock has been received, identified, cataloged, and stored at locations agreed upon with Owner. 1.10 DESIGN/BUILD PROCEDURES A. Design as Part of Means and Methods of Construction: Select Project components require construction team design as part of means and methods of construction as described in various sections. 1. Terms commonly used such as Design/Build, Delegated Design, and Design/Assist are applicable to these procedures as determined by law but shall be generally referred to in these documents as Design/Build. a. In general Design/Build includes design by licensed professionals with expertise beyond that allowed under standard architectural licensure, and outside of scope of work of other design professionals on the design team. 2. Contractor may be required to provide design services as part of construction for specific work defined as design or design-build where special expertise is required that is not available in the Project design team. 3. Subcontractors, fabricators, and manufacturers may be required to provide design services as part of their work due to special expertise in design services for their specific components, refer to technical sections for Design/Build. 144 MOORPARK CITY HALL TENANT IMPROVEMENT 06/09/2023 MOORPARK, CALIFORNIA 01 30 00 - 6 Administrative Requirements 4. Contractor, subcontractors, fabricators, manufacturers, and suppliers shall be responsible for attachments, anchors, fasteners, adhesives, and connectors suitable to applications unless specific items are listed in Contract Documents. a. Where specific items are listed in Contract Documents Contractor, subcontractors, fabricators, manufacturers, and suppliers shall review and submit comments where items listed are not acceptable. b. Where no comments are received, listed items shall be considered acceptable. B. Contractor acknowledges and accepts responsibility for specialty design as part of means and methods of construction, as well as coordination of parties involved to achieve architectural design intent indicated in Contract Documents. 1. Design-build work includes sizing, sequencing, and detailing for construction by professional licensed or registered engineer or design professional with special expertise applicable to portion of Work involved. 2. Design-build work shall be constructed in compliance with building codes and regulations in effect and shall be fit and proper for intended use. 3. Design-build work shall include drawings, specifications, and calculations prepared, stamped, and signed by qualified professional licensed or registered engineer licensed in the Project location as appropriate to design-build work. a. Plans, specifications, and calculations shall be acceptable to Owner, Owner’s Representative, and applicable authorities. 4. Contractor shall make all revisions and corrections necessary to obtain all approvals from all agencies and authorities having jurisdiction at no additional cost to the owner. C. Where required by Owner Contractor shall submit copies of current insurance policies covering errors and omissions of persons designing design-build work with deductibles and limits per occurrence as mutually agreed by Owner and Contractor. 1. Provide endorsement to insurance providing for 30-day notice to Owner prior to cancellation or material reduction in coverage. 2. Insurance shall be maintained for not less than applicable statute of limitations for claims of latent defects, if such insurance is not written on an occurrence basis during time design-build work is designed and constructed. 145 MOORPARK CITY HALL TENANT IMPROVEMENT 06/09/2023 MOORPARK, CALIFORNIA 01 30 00 - 7 Administrative Requirements D. Review proposed layouts with Design Team and with various trades prior to commencing work related to design-build work. 1.11 DEFERRED APPROVAL REQUIREMENTS A. Installation of deferred approval items shall not be started until detailed plans, specifications, and engineering calculations have been accepted and signed by Architect or Engineer of Record responsible for Project design. B. Deferred Approval Items shall be signed by California registered architect or professional engineer delegated responsibility covering specific work shown requiring approval from the authority having jurisdiction. 1. Deferred approval items for this Project include but may not be limited to following: a. Fire Protection system (alteration and expansion) b. Dry Agent/Chemical fire suppression system for computer room c. Fire Alarm (under separate contract) d. Exterior Signage, building mounted. e. Emergency Generator (Ventura County Air Quality Permit) 2. Deferred approval drawings and specifications become part of the approved submittal documents for the Project when they are submitted to and approved by the authority having jurisdiction. 3. Submit copies of calculations, product data and test reports in quantity required by authority having jurisdiction. 4. Identify and specify supports, fasteners, spacing, penetrations, etc., for each deferred approval items, including calculations for each fastener. 5. Submit documents to Owner for review prior to submittal to authority having jurisdiction. 6. Deferred submittal documents shall bear stamp and signature of architect or engineer licensed in State of California and responsible for work shown on deferred submittal documents. 7. Contractor shall make all corrections as required by reviewing agencies and resubmit as required to obtain approval at no additional cost to the owner. END OF SECTION 146 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 31 00 - 1 Project Management and Coordination SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Description of Project management and coordination including but not necessarily limited to the following: 1. General Project coordination procedures. 2. Coordination drawings. 3. Staff names. 4. Administrative and supervisory personnel. 5. Project meetings. B. Related Sections: 1. Section 01 30 00: Administrative requirements. 2. Section 01 79 00: Demonstration and training. 1.2 COORDINATION A. Coordination: Coordinate construction operations included in various Specifications sections to ensure efficient and orderly installation of each part of Work. 1. Coordinate construction operations that depend on each other for proper installation, connection, and operation. 2. Coordinate work to assure efficient and orderly sequence of installation of construction elements. 3. Make provisions for accommodating items installed by Owner or under separate contracts. B. Prepare memoranda for distribution to each party involved as needed, outlining special procedures required for coordination. 1. Include required notices, reports, and list of attendees at meetings; include Architect and Owner in distribution. C. Verify characteristics of interrelated operating equipment are compatible; coordinate work having interdependent responsibilities for installing, connection to, and placing such equipment in service. 147 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 31 00 - 2 Project Management and Coordination D. Coordinate space requirements and installation of mechanical and electrical work indicated diagrammatically on Drawings. 1. Follow routing shown for pipes, ducts, and conduits as closely as possible; make runs parallel with lines of building. 2. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. E. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated; coordinate locations of fixtures and outlets with finish elements. F. Administrative Procedures: Coordinate scheduling and timing of administrative procedures with other construction activities and activities of other contractors to avoid conflicts and ensure orderly progress of Work. 1.3 SUBMITTALS A. Coordination Drawings: Prepare Coordination Drawings for areas where space availability is limited and necessitates maximum utilization of space for components and where separate entities, products, and materials require coordination. 1. Require each subcontractor with items located in ceiling space to furnish coordination drawings of their items to assist in preparation of Contractor’s Coordination Drawings. 2. Indicate relationship of components shown on separate Shop Drawings. 3. Indicate required installation sequences. 4. Ceiling Spaces: Take special care to coordinate structure, ceiling systems, equipment located in ceiling spaces, fire protection systems, mechanical systems, and electrical systems. B. Staff Names: Immediately after receipt of notice to proceed or immediately after signing of Contract by Owner and Contractor, submit list of principal staff assignments, including superintendent and other personnel in attendance at Project site. 1. Post copies of list in Project meeting room, in temporary field office, and by each temporary telephone. 1.4 SUPERVISORY AND ADMINISTRATIVE PERSONNEL A. Provide supervisory personnel, in addition to Project Superintendent, as required for proper and timely performance of Work and coordination of subcontracts. B. Provide administrative staff as required to allow Project Superintendent and supervisory personnel to allocate maximum time to Project supervision and coordination. 1.5 PROJECT MEETINGS A. Schedule and administer Project meetings throughout progress of Work: 148 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 31 00 - 3 Project Management and Coordination 1. Pre-construction meeting. 2. Progress meetings at weekly intervals. 3. Pre-installation conferences. 4. Coordination meetings. 5. Special meetings. B. Make physical arrangements for meetings, prepare agenda with copies for participants, preside at meetings, record minutes and distribute copies within two days to Architect, Owner, participants, and those affected. C. Attendance: Job superintendent, major subcontractors and suppliers as appropriate to agenda; Architect, Owner, and Owner and Architect’s consultants as appropriate to agenda topics for each meeting. D. Suggested Agenda: Review of Work progress, status of progress schedule and adjustments, delivery schedules, submittals, requests for information, maintenance of quality standards, pending changes and substitutions, and issues needing resolution. END OF SECTION 149 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 31 10- 1 Information and Procedures Instructions (RFI) SECTION 01 31 10 INFORMATION AND PROCEDURES INSTRUCTIONS (RFI) PART 1 – GENERAL 1.1 SUMMARY A. This Section contains procedures to be followed by Contractor upon discovery of any apparent conflicts, omissions, or errors in Contract Documents or upon having any question concerning interpretation. B. Alternate: At the Owners option, Utilize the standard forms, procedures, contracts and / or agreements, preferred by the owner, in lieu of the methods described herein. 1.2 PROCEDURES A. Requests for clarification shall be submitted to the owner per front end documents. Section 3-7.4. B. RFIs shall be numbered sequentially. RFI number shall be followed by a sequential numerical suffix as necessary for each resubmission. For example, first RFI would be 001. Second RFI would be 002 and first resubmittal of RFI 002 would be 002.1. C. Each RFI shall be limited to ONE subject. D. An RFI shall be submitted if one of following conditions occur: 1. Contractor discovers an unforeseen condition or circumstance that is not described in Contract Documents. 2. Contractor discovers an apparent conflict or discrepancy between portions of Contract Documents that appears to be inconsistent or is not reasonably inferred from intent of Contract Documents. 3. Contractor discovers what appears to be an omission from Contract Documents that cannot be reasonably inferred from intent of Contract Documents. E. Contractor shall not: 1. Submit an RFI as a request for substitution. 2. Submit an RFI as a submittal. 3. Submit an RFI under pretense of a Contract Documents discrepancy or omission without thorough review of documents. 150 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 31 10- 2 Information and Procedures Instructions (RFI) 4. Submit an RFI in a manner that suggests specific portions of Contract Documents are assumed to be excluded or by taking an isolated portion of Contract Documents in part rather than whole. 5. Submit an RFI in an untimely manner without proper coordination and scheduling of Work of related trades. 6. If Contractor submits an RFI contrary to any of above, Contractor shall pay cost of any review, which cost shall be deducted from Contract sum. F. Submit a request for information or clarification immediately upon discovery. Submit RFI’s within a time frame so as not to delay Contract schedule while allowing full response time described below. 1.3 RESPONSE TIME: A. Per front end documents. Section 3-7.4. B. Should Contractor proceed with Work affected before receipt of a response from Architect, within response time described above, any portion of Work which is not done in accordance with Architect’s interpretations, clarifications, instructions, or decisions is subject to removal or replacement and Contractor shall be responsible for all resultant losses. C. In event of failure to agree as to scope of Contract requirements, Contractor shall follow procedures set forth in General Conditions. END OF SECTION 151 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 35 15 - 1 CALGreen Environmental Requirements SECTION 01 35 15 CALGREEN ENVIRONMENTAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Comply with CALGreen environmental requirements related to energy efficiency, water efficiency and conservation, material conservation and resource efficiency, and environmental quality. 1. Comply with specific CALGreen requirements as adopted by authorities having jurisdiction and applicable to Project. 2. Comply with waste management program as enforced by the City of Moorpark, see front end documents. 1.2 ENVIRONMENTAL REQUIREMENTS A. Mandatory Measures: Comply with CALGreen Mandatory Measures applicable to Project. B. Requirements: Construction team is required to review CALGreen requirements relative to Project related to following. 1. Energy Efficiency: Comply with California Energy Commission requirements. 2. Water Efficiency and Conservation: Comply with requirements for both indoor and outdoor water use. 3. Material Conservation and Resource Efficiency: a. Nonresidential Projects: Provide weather-resistant exterior wall and foundation envelope including prevention of landscape irrigation spray on structures (if any) and prevent water intrusion at exterior entries. b. Provide construction waste management plan as defined by CALGreen with demolition and construction waste diverted from landfill by recycling or salvage for reuse. c. Nonresidential Projects Building Maintenance and Operation: Provide for commissioning requirements as required by CALGreen including but not limited to testing, documentation and training, testing and adjusting. 4. Nonresidential Projects Environmental Quality: Comply with following as adopted by authorities having jurisdiction and as applicable to Project. a. Mechanical Equipment Pollution Control: Cover duct and related air distribution component openings to prevent dust and debris accumulation. 152 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 35 15 - 2 CALGreen Environmental Requirements b. Finish Material Pollution Control: Comply with CALGreen requirements for volatile organic compound (VOC) emissions including but not necessarily limited to following (as applicable): 1) Adhesives, sealants and caulks. 2) Paints and coatings. 3) Carpet systems including carpet, carpet cushion, and adhesives. 4) Resilient flooring systems. 5) Composite wood products formaldehyde limitations. c. Filters: Comply with requirements for mechanically ventilated buildings to have air filtration media for outside and return air prior to occupancy. d. Environmental Tobacco Smoke (ETS) Control: Comply with CALGreen requirements for ETS. e. Interior Moisture Control: Comply with California Building Code requirements and CALGreen requirements for vapor retarder at concrete slab foundations and capillary break (aggregate base). f. Building Material Moisture Content: Do not use water damaged building materials, remove and place wet and high moisture content insulation, and do not enclose wall or floor framing when moisture content exceeds 19%. g. Indoor Air Quality: Comply with CALGreen requirements for outside air delivery and carbon dioxide monitoring. h. Environmental Comfort: Comply with CALGreen requirements for whole acoustical control and interior sound control. i. Outdoor Air Quality: Comply with CALGreen requirements for reduction of greenhouse gases and ozone depletion. C. Planning and Design: Construction team shall coordinate with Design Team regarding Project Planning and Design methods related to CALGreen requirements related to Project design and shall comply with requirements related to construction. 1.3 QUALITY ASSURANCE A. Project Management and Coordination: Contractor to identify one person on Contractor’s staff to be responsible for CALGreen issues compliance and coordination. 1. Experience: Environmental project manager to have experience relating to CALGreen building construction. 2. Responsibilities: Carefully review Contract Documents for CALGreen issues, coordinate work of trades, subcontractors, and suppliers; instruct workers relating to environmental issues; and oversee Project Environmental Goals. 153 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 35 15 - 3 CALGreen Environmental Requirements a. Submittals: Collect, compile, verify, and maintain sufficient information for submittals indicating compliance with applicable CALGreen requirements. 3. Meetings: Discuss CALGreen Goals at following meetings. a. Pre-construction meeting. b. Pre-installation meetings. c. Regularly scheduled job-site meetings. B. CALGreen Issues Criteria: Comply with requirements listed in CALGreen and various Specification sections. PART 2 - PRODUCTS 2.1 MATERIALS A. General Issues: Do not use materials with moisture stains or with signs of mold or mildew. 1. Moisture Stains: Materials that have evidence of moisture damage, including stains, are not acceptable, including both stored and installed materials; immediately remove from site. 2. Mold and Mildew: Materials that have evidence of growth of molds or of mildew are not acceptable, including both stored and installed materials; immediately remove from site. 2.2 SUBSTITUTIONS A. Substitutions Environmental Issues: Requests for substitutions shall comply with requirements specified in Section 01 25 00 – Substitution Procedures, with following additional information required where environmental issues are involved. 1. Indicate each proposed substitution complies with CALGreen requirements. 2. Owner and Architect reserve right to reject proposed substitutions where CALGreen information is not provided and where substitution may impact mandatory requirements or Project voluntary tier requirements. PART 3 - EXECUTION 3.1 PROTECTION A. Environmental Issues: Protect interior materials from water damage; where interior products not intended for wet applications are exposed to moisture, immediately remove from site. 1. Protect installed products using methods that do not support growth of molds and mildews. Immediately remove from site materials with mold and materials with mildew. 154 McLARAND, VASQUEZ, EMSIEK & PARTNERS, INC. OFFICE SPEC MASTERS 2011 01 35 15 - 4 CALGreen Environmental Requirements END OF SECTION 155 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 40 00 - 1 Quality Requirements SECTION 01 40 00 QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. This section describes general quality control requirements. 1. General quality control. 2. Manufacturers' field services. 3. Independent testing laboratory services and inspections. B. Related Requirements: 1. Refer to applicable codes and Specifications sections for test requirements. 1.2 QUALITY CONTROL, GENERAL A. Maintain quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality. 1.3 MANUFACTURER'S FIELD SERVICES A. When specified in respective Specification sections, require manufacturer or supplier to have qualified personnel provide on-site observations and recommendations. 1. Observe field conditions, including conditions of surfaces and installation. 2. Observe quality of workmanship. 3. Provide recommendations to assure acceptable installation and workmanship. 4. Where required, start, test, and adjust equipment as applicable. B. Representative shall submit written report to Architect or Owner listing observations and recommendations. 1.4 TESTING LABORATORY SERVICES AND INSPECTIONS A. Refer to owner’s front end documents. END OF SECTION 156 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 50 00 - 1 Temporary Facilities and Controls SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This section describes temporary construction facilities and temporary controls. 1. Electricity and lighting. 2. Heat and ventilation. 3. Water and sanitary facilities. 4. Construction aids. 5. Temporary enclosures. 6. Barriers. 7. Cleaning during construction. 8. Project identification. 9. Field offices. 10. Cellular telephone service. 11. Storage. B. Related Requirements: 1. Section 01 70 00: Progress cleaning and final cleaning. 2. Section 01 74 10: Waste management. C. Provide temporary construction facilities and temporary controls as required to conform to applicable authorities and as required to complete Project in accordance with Contract Documents. 1. Authorities: Contact governing authorities to establish extent of temporary facilities and temporary controls required by authorities. 1.2 ELECTRICITY AND LIGHTING A. Provide electrical service required for construction operations, with branch wiring and distribution boxes located to allow service and lighting by means of construction-type power cords. 1. Connection to existing electrical service is permitted. B. Provide lighting for construction operations. 1. Permanent lighting may be used during construction; maintain lighting and make routine repairs. C. Owner will pay costs of energy used from existing on-site services. 157 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 50 00 - 2 Temporary Facilities and Controls 1.3 HEAT AND VENTILATION A. Provide heat and ventilation as required to maintain specified conditions for construction operation, to protect materials and finishes from damage due to temperature and humidity. B. Owner will pay costs of energy used from existing on-site services. 1.4 WATER AND SANITARY FACILITIES A. Provide water service required for construction operations; extend branch piping with outlets located so water is available by use of hoses. 1. Connection to existing facilities is permitted. 2. Owner will pay for water used from existing on-site services. B. Provide and maintain required sanitary facilities and enclosures. 1.5 CONSTRUCTION AIDS A. Noise, Dust and Pollution Control: Provide materials and equipment necessary to comply with local requirements for noise, dust and pollution control. B. Fire Protection: Maintain on-site fire protection facilities as required by applicable authorities and insurance requirements. C. Security: Protect Site and Work; prevent unauthorized entry, vandalism, and theft. D. Dewatering: Provide and operate drainage and pumping equipment; maintain excavations and site free of standing water. 1.6 ENCLOSURES A. Temporary Closures: Provide temporary weather-tight closures for exterior openings for acceptable working conditions, for protection for materials, to protect interior materials from dampness, for temporary heating, and to prevent unauthorized entry. 1. Provide doors with self-closing hardware and locks. B. Temporary Partitions: Provide temporary partitions as required to separate work areas from completed areas, to prevent penetration of dust and moisture into completed areas, and to prevent damage to finished areas and installed equipment. 1. Construction: Framing and sheet materials with closed joints and sealed edges at intersections with existing surfaces; Flame Spread Rating of 25 in accordance with ASTM E84. 1.7 BARRIERS A. Barriers: Provide barriers as required to prevent public entry to construction areas and to protect adjacent properties from damage from construction operations. 158 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 50 00 - 3 Temporary Facilities and Controls 1. Fence: Provide minimum 8-foot high commercial grade chain link fence around construction site; equip with gates with locks. 2. Temporary Signs: Subject to approval of Owner unless required by an agency. B. Barricades: Provide barricades as required by governing authorities. C. Tree Protection: Provide barriers around trees and plants designated to remain; protect against vehicular traffic, stored materials, dumping, chemically injurious materials, and puddling or continuous running water. 1.8 CLEANING DURING CONSTRUCTION A. Control accumulation of waste materials and rubbish; recycle or dispose of off-site. B. Clean interior areas prior to start of finish work, maintain areas free of dust and other contaminants during finishing operations. 1.9 FIELD OFFICES A. Field Office: Provide weather-tight field office, with lighting, electrical outlets, data outlets, heating, and ventilating equipment, and equipped with furniture. 1. Meeting Space: In addition, provide space for Project meetings with table and chairs to accommodate minimum six persons. 2. Telephone Service: Provide telephone service to field office. 3. Multi-Purpose Copier: Provide plain paper multi-purpose color and black-and- white copier with enlargement and reduction capability and with built-in printer, scanner, and facsimile capabilities. 1.10 CELLULAR TELEPHONE SERVICE A. Cellular Telephone Service: Furnish on-site Project Managers with cellular telephone. Ensure Owner and Architect ability to contact site during construction operations. 1. Schedules: Submit schedules of on-site Project Managers with individual cellular telephone numbers to Owner and Architect; maintain schedules and cell phone numbers up to date during Project on-site operations. 1.11 STORAGE A. Storage for Tools, Materials, and Equipment: Limit on-site storage to Project area; provide weather-tight storage, with heat and ventilation for products requiring controlled conditions. 1. Maintain adequate space for organized storage and access. 2. Provide lighting for inspection of stored materials. 159 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 50 00 - 4 Temporary Facilities and Controls 1.12 REMOVAL A. Remove temporary materials, equipment, services, and construction prior to Substantial Completion Inspection. B. Clean and repair damage caused by installation or use of temporary facilities. C. Restore existing facilities used during construction to specified or original condition. END OF SECTION 160 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 01 56 39 - 1 Temporary Tree and Plant Protection SECTION 01 56 39 TEMPORARY TREE AND PLANT PROTECTION PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the protection and trimming and root pruning of trees that interfere with, or are affected by, execution of the Work, whether temporary or new construction. 1.2 SUBMITTAL A. The Contractor's representatives and employees shall be experienced in landscape maintenance. B. Certification from a qualified arborist that trees indicated to remain have been protected during construction according to recognized standards and that trees were promptly and properly treated and repaired when damaged. C. Maintenance recommendation from a qualified arborist for care and protection of trees affected by construction during and after completing the Work. American Welding Society (AWS): D1.1, Structural Welding Code. 1.3 QUALITY ASSURANCE A. Arborist Qualifications: An arborist certified by the International Society of Arboriculture or licensed in the jurisdiction where Project is located. B. Tree Pruning Standards: Comply with ANSI A300, "Trees, Shrubs, and Other Woody Plant Maintenance--Standard Practices," unless more stringent requirements are indicated. C. Pre-installation Conference: Before starting tree protection and trimming, meet with representatives of authorities having jurisdiction, Owner, Landscape Architect, consultants, and other concerned entities. Review tree protection and trimming procedures and responsibilities. PART 2 - PRODUCTS 2.1 MATERIALS A. Drainage Fill: Selected crushed stone, or crushed or uncrushed gravel, washed, ASTM D 448, Size 24, with 90 to 100 percent passing a 2-1/2-inch sieve and not more than 10 percent passing a 3/4-inch sieve. B. Topsoil: Fertile, friable, surface soil, containing natural loam and complying with ASTM D 5268. Provide topsoil that is free of stones larger than 1 inch in any dimension and free of other extraneous or toxic matter harmful to plant growth. Obtain topsoil only from well-drained sites where soil occurs in depth of 4 inches or more; do not obtain from bogs or marshes. C. Filter Fabric: Manufacturer's standard, non-woven, pervious, geotextile fabric of polypropylene, nylon, or polyester fibers. 161 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 01 56 39 - 2 Temporary Tree and Plant Protection D. Chain Link Fence: Metallic-coated steel chain link fence fabric, 0.120-inch- diameter wire size; 72 inches high, minimum; line posts, 1.9 inches in diameter; terminal and corner posts, 2-3/8 inches in diameter; top rail, 1-5/8 inches in diameter; bottom tension wire, 0.177 inch in diameter; with tie wires, hog ring ties, and other accessories for a complete fence system. PART 3 - EXECUTION 3.1 PREPARATION A. Before construction begins, fertilize affected trees to improve tree vigor and health. Soil analysis testing should be completed to assure fertilization with the appropriate fertilizer products. B. Temporary Fencing: Install temporary fencing located at or outside the drip line of trees. C. Protect tree root systems from damage due to noxious materials caused by runoff or spillage while mixing, placing, or storing construction materials. Protect root systems from flooding, eroding, or excessive wetting caused by dewatering operations. D. Do not store construction materials, debris, or excavated material within the drip line of remaining trees. Do not permit vehicles or foot traffic within the drip line; prevent soil compaction over root systems. E. Do not allow fires under or adjacent to remaining trees or other plants. 3.2 EXCAVATION A. Do not excavate within drip line of trees. B. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow tine spading forks and comb soil to expose roots. 1. Cut roots approximately 3 inches back from new construction. 2. Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist condition. Protect roots from damage until they are permanently relocated and covered with soil. 3. Where utility trenches are required within drip line of trees, tunnel under or around roots by drilling, auger boring, pipe jacking, or digging by hand. 4. Root Pruning: Do not cut main lateral roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots with sharp pruning instruments; do not break or chop. 162 JLS MS Building Remodel and Addition DSA SUBMITTAL Palo Alto Unified School District 5/26/2022 00 01 10 - 3 Temporary Tree and Plant Protection 3.3 TREE PRUNING A. Promptly repair trees damaged by construction operations within 24 hours. Treat damaged trunks, limbs, and roots according to written instructions of the qualified arborist. B. Root prune existing street trees to prevent sidewalk and curb damage. C. Prune remaining trees to compensate for root loss caused by damaging or cutting root system. Provide subsequent maintenance during Contract period as recommended by qualified arborist. D. Pruning Standards: Prune trees according to ANSI A300 as follows: 1. Crown cleaning. 2. Crown thinning. 3. Crown reduction. 3.4 TREE REPAIR AND REPLACEMENT A. Promptly repair trees damaged by construction operations within 24 hours. Treat damaged trunks, limbs, and roots according to written instructions of the qualified arborist. B. Remove and replace dead and damaged trees that the qualified arborist determines to be incapable of restoring to a normal growth pattern. C. Provide new trees of the same size and species as those being replaced; plant and maintain as specified in Division 2 Section "Planting. 3.5 SOIL AERATION A. Aerate surface soil compacted during construction, 10 feet beyond drip line and no closer than 36 inches to tree trunk. Drill 2-inch- diameter holes a minimum of 12 inches deep at 24 inches on center. Backfill holes with an equal mix of augured soil and sand. 3.6 DISPOSAL OF WASTE MATERIALS A. Burning is not permitted. B. Disposal: Remove excess excavated material, displaced trees, and excess chips from Owner's property. 3.7 TREE PRUNING A. Prune tree canopies and branches at the direction of the project arborist to remove any dead or broken branches, and to provide the necessary clearances for the construction equipment. B. Root prune existing street trees to prevent sidewalk and curb damage. C. Prune remaining trees to compensate for root loss caused by damaging or cutting root system. Provide subsequent maintenance during Contract period as recommended by qualified arborist. D. Pruning Standards: Prune trees according to ANSI A300 as follows: 1. Crown cleaning. 163 JLS MS Building Remodel and Addition DSA SUBMITTAL Palo Alto Unified School District 5/26/2022 00 01 10 - 4 Temporary Tree and Plant Protection 2. Crown thinning. 3. Crown reduction. 3.8 TREE REPAIR AND REPLACEMENT A. Promptly repair trees damaged by construction operations within 24 hours. Treat damaged trunks, limbs, and roots according to written instructions of the qualified arborist. B. Remove and replace dead and damaged trees that the qualified arborist determines to be incapable of restoring to a normal growth pattern. C. Provide new trees of the same size and species as those being replaced; plant and maintain as specified in Division 2 Section "Planting. 3.9 SOIL AERATION A. Aerate surface soil compacted during construction, 10 feet beyond drip line and no closer than 36 inches to tree trunk. Drill 2-inch- diameter holes a minimum of 12 inches deep at 24 inches on center. Backfill holes with an equal mix of augured soil and sand. 3.10 DISPOSAL OF WASTE MATERIALS A. Burning is not permitted. B. Disposal: Remove excess excavated material, displaced trees, and excess chips from Owner's property. END OF SECTION 164 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 60 00 - 1 Product Requirements SECTION 01 60 00 PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. This section describes basic product requirements governing material and equipment. 1. General product requirements. 2. Product list. 3. Quality assurance. 4. Delivery, storage, and handling. B. Related Requirements: 1. Section 01 25 00: Substitution procedures. 2. Section 01 30 00: Submittal of manufacturers' certificates. 3. Section 01 77 00: Operation and maintenance data. 1.2 GENERAL PRODUCTS REQUIREMENTS A. Products include material, equipment, and systems. B. Comply with Specifications, referenced standards, and applicable codes and regulations as minimum requirements. C. Provide new materials except as specifically allowed by Contract Documents. D. Materials to be supplied in quantity within a Specification section shall be by one manufacturer, shall be the same, and shall be interchangeable. E. Provide equipment and systems composed of materials from a single manufacturer except where otherwise recommended by equipment or systems manufacturer or where otherwise indicated in Contract Documents. F. Contractor’s Options: Comply with following options; requests for substitutions for named manufacturers and products shall comply with requirements specified in Section 01 25 00 – Substitution Procedures. 1. Products Identified by Reference Standards: Select product meeting referenced standard for products specified only by reference standard. a. Requests for Substitutions to be limited to products not complying with referenced standards. 1) Submit justification for non-compliance with reference standards as part of Request for Substitutions; if product is foreign made submit rationale why foreign standards and basic materials indicates compliance. 165 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 60 00 - 2 Product Requirements 2. Named Manufacturers: Where names of manufacturers are specified select any named manufacturer product meeting Specifications for products specified by naming one or more manufacturers. a. Submit Request for Substitution for any manufacturer not named. 3. Named Manufacturers and Named Products: Select any named manufacturer named product meeting Specifications for products specified by naming one or more manufacturers and products. a. Where only one manufacturer and product is named together with additional manufacturers without specific products, Requests for Substitutions to be limited to products not comparable to that specified. 1) Contractors, subcontractors, suppliers, and manufacturers shall take special care to ensure comparable products are being supplied based on design, performance, quality, and longevity. 2) Substitutions: Submit Request for Substitution for any manufacturer not named and for products not comparable to those specified in design, performance, quality, and longevity. 4. Basis of Design: Where manufacturer or manufacturer and product both are indicated as Basis of Design, submit Request for Substitution for other manufacturers and products. 5. “Or Equal” Clauses: Submit request for substitution for manufacturer or product not specifically named in Specifications where terms "or equal", "or approved equal", or similar references are made. G. Nameplates: Do not attach or imprint manufacturer or producer nameplates on exposed surfaces in occupied spaces except for required labels and operating data. 1. Equipment Nameplates: Provide permanent nameplate on service connected and power operated equipment located on easily accessible surface inconspicuous in occupied spaces. a. Provide name of product and manufacturer, model and serial number, capacity, speed, rating, and similar information. 1.3 SUBMITTALS A. Product List: Within 21 days after award of Contract, submit to Owner and Architect a complete list of major products proposed for installation, with name of manufacturer, trade name, and model. B. Product List: Prior to submittal of second Request for Payment, submit to Architect complete list of major products which are proposed for installation, with name of manufacturer, trade name, and model. 166 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 60 00 - 3 Product Requirements 1. Tabulate products by Specification number and title. C. Substitutions: Refer to Section 01 25 00 – Substitution Procedures. 1.4 QUALITY ASSURANCE A. Comply with industry standards and applicable codes except when more restrictive tolerances or requirements indicate more rigid standards or precise workmanship. B. Perform work by persons qualified to produce workmanship of specified quality. C. Install products straight, true-to-line, and in correct relationship to adjacent materials, with hairline joints, free of rough, sharp and potentially hazardous edges. D. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking. 1. Seismic Anchors: Conform to code requirements. 1.5 DELIVERY, STORAGE, AND HANDLING A. Transport products by methods to avoid product damage, deliver in undamaged condition in manufacturer's unopened containers or packaging. B. Store products in accordance with manufacturer's instructions, with seals and labels intact and legible. C. Store sensitive products in weather-tight enclosures; maintain within temperature and humidity ranges required by manufacturer's instructions. D. For exterior storage of fabricated products, place on sloped supports above ground. E. Store loose granular materials on solid surfaces in a well-drained area; prevent mixing with foreign matter. F. Arrange storage to provide access for inspection; periodically inspect to assure products are undamaged and are maintained under required conditions. G. Provide equipment and personnel to handle products by methods to prevent soiling and prevent damage. H. Promptly inspect shipments to assure products comply with requirements, quantities are correct, and products are undamaged. I. Immediately remove from Project products damaged, wet, stained, and products with mold and products with mildew. 1. Take special care to prevent absorbent products such as gypsum board and acoustical ceiling units from becoming wet. END OF SECTION 167 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 70 00 - 1 Execution Requirements SECTION 01 70 00 EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. This section describes execution requirements. 1. Installer qualifications. 2. Examination. 3. Manufacturer’s instructions. 4. Installation. 5. Cleaning. 6. Protection. B. Related Requirements: 1. Section 01 50 00: Temporary Facilities and Controls. 2. Section 01 77 00: Closeout procedures. 3. Section 01 79 00: Demonstration and training. 1.2 INSTALLER QUALIFICATIONS A. Experienced Installers: Installers to have minimum five-years successful experience installing items like those required for Project, except for individuals in training under direct supervision of experienced installer. 1.3 EXAMINATION A. Acceptance of Conditions: Beginning installation of a product signifies installer has examined substrates, areas, and conditions for compliance with manufacturer requirements for tolerances and other conditions affecting performance. B. Field Measurements: Take field measurements as required to fit Work properly; recheck measurements prior to installing each product. 1. Where portions of Work are to fit to other construction verify dimensions of other construction by field measurements before fabrication; allow for cutting and patching to avoid delaying Work. C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings. 168 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 70 00 - 2 Execution Requirements 1.4 MANUFACTURERS' INSTRUCTIONS A. Manufacturer’s Recommendations: When work is specified to comply with manufacturers' recommendations or instructions, distribute copies to persons involved and maintain one set in field office. 1. Conform to requirements specified in Section 01 30 00 for submittal of recommendations or instructions to Architect; submit to Architect only where specified or where specifically requested; otherwise keep in Field Office. B. Perform work in accordance with details of recommendations and instructions and specified requirements. 1. Should a conflict exist between Specifications and recommendations or instructions consult with Architect. C. Where manufacturer's information notes special recommendations in addition to installation instructions, comply with both recommendations and instructions. 1.5 INSTALLATION A. Pre-Installation Meetings: Installers and suppliers are to attend pre-installation meetings scheduled by Contractor. B. Comply with manufacturers written recommendations and installation instructions unless more restrictive requirements are specified. C. Locate Work and components accurately, in correct alignment and elevation. 1. Make vertical work plumb and horizontal work level. 2. Install components to allow space for maintenance and ease of removal for replacement. D. Install products at time and under conditions to ensure best possible results; maintain conditions required for product performance until Substantial Completion. E. Conduct operations so no part of Work is subject to damaging operations or excessive loads during normal conditions. F. Securely anchor permanent construction in place, accurately located and aligned with other portions of Work. G. Allow for building movement including thermal expansion and contraction. H. Make joints of uniform width; arrange joints as indicated, for best visual effect where not otherwise indicated; fit exposed connections together to form hairline joints except where otherwise indicated. 169 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 70 00 - 3 Execution Requirements 1.6 CLEANING A. Cleaning During Construction: Specified in Section 01 50 00 - Temporary Facilities and Controls. B. Progress Cleaning: Keep installed areas clean using cleaning materials specifically recommended by manufacturers of product being cleaned; where not otherwise recommended use nontoxic materials that will not damage surfaces. 1. Remove debris from concealed spaces before enclosing space. 2. Supervise construction operations to assure no part of construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during construction period. C. Final Cleaning: Execute final cleaning at Substantial Completion. 1. Clean interior and exterior surfaces exposed to view; remove temporary labels, stains and foreign substances; polish transparent and glossy surfaces; vacuum carpeted and soft surfaces. a. Vacuuming Equipment: Type with high efficiency particulate arrestor (HEPA) type filters; properly maintained. 2. Clean equipment and fixtures to a sanitary condition, clean filters of mechanical equipment, replace filters where cleaning is impractical. a. Clean ducts. 3. Clean site; sweep paved areas. 4. Remove waste, surplus materials and rubbish from Project and site; recycle to maximum extent feasible. 1.7 PROTECTION A. Protect products subject to deterioration with impervious cover. Provide ventilation to avoid condensation and trapping water. B. Take care to use protective covering and blocking materials that do not soil, stain, or damage materials being protected. C. After installation, provide coverings to protect products from damage from traffic and construction operations, remove when no longer needed. D. Protect interior materials from water damage; immediately remove wet materials from site to prevent growth of mold and mildew on site. END OF SECTION 170 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 01 73 00 - 1 Cutting and Patching SECTION 01 73 00 CUTTING AND PATCHING PART 1 - GENERAL 1.1 SUMMARY A. Contractor is responsible for cutting, fitting and patching to complete Work and to: 1. Make its parts fit together properly. 2. Uncover work to provide for installation of ill-timed work. 3. Remove and replace defective work. 4. Remove and replace work not conforming to Contract Documents. 5. Remove samples of installed work as required for testing. 6. Provide routine penetrations of non-structural surfaces for installation of piping. 7. Provide routine penetrations of non-structural surfaces for installation of conduit. B. Related Requirements: 1. Section 01 50 00: Temporary facilities and controls. 2. Section 02 41 20: Selective building demolition for remodeling. 1.2 SUBMITTALS A. Submit written request well in advance of cutting or alteration which affects: 1. Structural value or integrity of any element of Project. 2. Integrity of weather-exposed or moisture-resistant elements. 3. Efficiency, operational life, maintenance or safety of operational elements. 4. Visual qualities of sight-exposed elements. B. Request shall include: 1. Identification of Project and description of affected work. 2. Necessity for cutting or alteration. 3. Effect on structural integrity, or weatherproof integrity of Project. 4. Alternatives to cutting and patching. 5. Cost proposal, when applicable. 6. Written permission of separate contractor whose work will be affected. 7. Description of proposed work including: a. Scope of cutting, patching, alteration, or excavation. b. Products proposed to be used. c. Extent of refinishing to be included. C. Should conditions of Work or schedule indicate a change of products from original installation, Contractor shall submit request for substitution as specified in Section 01 25 00 – Substitution Procedures. D. Submit written notice to Architect designating date and time work will be uncovered. 171 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 01 73 00 - 2 Cutting and Patching PART 2 - PRODUCTS 2.1 MATERIALS A. Comply with Specifications and standards for each specific product involved. B. Where Specifications and standards have not been provided, provide materials and fabrication consistent with quality of Project and intended for commercial construction. C. Provide new materials for cutting and patching unless otherwise indicated. PART 3 - EXECUTION 3.1 INSPECTION A. Inspect existing conditions of Project, including elements subject to damage or to movement during cutting and patching. B. After uncovering work, inspect conditions affecting installation of products, or performance of work. C. Report unsatisfactory or questionable conditions to Architect in writing; do not proceed with work until Architect has provided further instructions. 3.2 PREPARATION A. Provide adequate temporary support as necessary to assure structural value or integrity of affected portion of Work. 1. Provide services of licensed engineer for designing temporary support where required by applicable authorities for temporary supports and for shoring; submit engineering calculations directly to applicable authorities upon request. B. Protect other portions of Project from damage. 3.3 PERFORMANCE A. Execute cutting by methods that provide proper surfaces to receive installation of repairs and finishes. 1. Execute excavating and backfilling by methods which will prevent settlement, and which will prevent damage to other work. B. Employ same installer or fabricator to perform cutting and patching work as employed for new construction for: 1. Weather-exposed or moisture resistant elements. 2. Sight-exposed finished surfaces. C. Execute fitting and adjustment of products to provide a finished installation to comply with specified products, functions, tolerances and finishes. 172 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 01 73 00 - 3 Cutting and Patching D. Restore work that has been cut or removed; install new products to provide completed Work in accordance with requirements of Contract Documents. E. Fit work tight to pipes, sleeves, ducts, conduit and penetrations through surfaces. F. Refinish entire surfaces as necessary to provide even finish to match adjacent finishes: 1. For continuous surfaces, refinish to nearest intersection. 2. For an assembly, refinish entire unit. END OF SECTION 173 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 74 10 - 1 Waste Management SECTION 01 74 10 WASTE MANAGEMENT PART 1 - GENERAL 1.1 SUMMARY A. Project requires special Waste Management Program. 1. CALGreen Waste Management: As required in Section 01 35 15. 2. Provide itemization of costs related to Waste Management Program. 3. Effect optimum control of solid wastes. 4. Prevent environmental pollution and damage. B. Related Work: 1. Section 01 35 15: CALGreen environmental requirements. 2. Section 01 50 00: Temporary facilities and controls. 1.2 DEFINITIONS A. Inert Fill: A permitted facility that accepts inert waste such as asphalt and concrete exclusively. B. Class III Landfill: A landfill that accepts non-hazardous waste such as household, commercial, and industrial waste, including construction, remodeling, repair, and demolition operations. C. Construction and Demolition Waste: Includes solid wastes, such as building materials, packaging, rubbish, debris, and rubble resulting from construction, remodeling, repair, and demolition operations. 1. Rubbish: Includes both combustible and noncombustible wastes, such as paper, boxes, glass, crockery, metal and lumber scrap, tin cans, and bones. 2. Debris: Includes both combustible and noncombustible wastes, such as leaves and tree trimmings that result from construction or maintenance and repair work. D. Chemical Waste: Includes petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals and inorganic wastes. E. Sanitary Wastes: 1. Garbage: Refuse and scraps resulting from preparation, cooking, distribution, or consumption of food. 2. Sewage: Domestic sanitary sewage. 174 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 74 10 - 2 Waste Management 1.3 SUBMITTALS A. Waste Management Program: Comply with Contract Documents and applicable code requirements for salvaging, recycling, and disposing of nonhazardous waste. END OF SECTION 175 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 77 00 - 1 Closeout Procedures SECTION 01 77 00 CLOSEOUT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. This section describes Contract closeout procedures. 1. Substantial Completion. 2. Final Completion. 3. Project record documents. 4. Material and finish data. 5. Operation and maintenance manuals. B. Related Requirements: 1. Section 01 30 00: Administrative requirements including attic stock. 2. Section 01 78 00: Warranties. 3. Section 01 79 00: Demonstration and training. 1.2 SUBSTANTIAL COMPLETION A. Immediately prior to Substantial Completion, schedule agency reviews as required for “temporary certificate of occupancy” or for “certificate of occupancy”. B. When Contractor considers Work, or a designated portion thereof is substantially complete, submit written notice, with list of items to be completed or corrected. 1. List (“Punch List”): Format pre-approved by Owner and Architect; tabular form with each space listed required. C. Within a reasonable time, Owner and Architect will inspect status of completion and may add to “Punch List”. 1. Contractor shall pay for Architect's time and direct expenses where more than one Substantial Completion inspection is required. D. Should Owner and Architect determine Work is not substantially complete, Contractor will be promptly notified in writing, giving reasons. E. Contractor shall remedy deficiencies and send a second written notice of substantial completion; Architect will reinspect Work. 1. Contractor shall pay for Architect's time and direct expenses where more than one Substantial Completion inspection is required. F. When Work is determined to be substantially complete by owner, a Certificate of Substantial Completion will be prepared in accordance with General Conditions. 176 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 77 00 - 2 Closeout Procedures 1.3 FINAL COMPLETION A. When Work is complete, submit written certification indicating: 1. Work has been inspected for compliance with Contract Documents. 2. Work has been completed in accordance with Contract Documents and deficiencies listed (in ‘Punch List”) with Certificate of Substantial Completion have been corrected. 3. Equipment and systems have been tested in presence of Owner's representative and are operational. 4. Work is complete and ready for final inspection. B. Special Submittals: In addition to submittals required by Contract, submit following. 1. Provide submittals required by governing authorities to governing authorities with copies included in Project Record Documents. 2. Submit final statement of accounting giving total adjusted Contract Sum, previous payments, and sum remaining due. 1.4 PROJECT RECORD DOCUMENTS A. Keep documents current; do not permanently conceal any work until required information has been recorded. 1. Owner will provide Contractor with a separate set of Drawings to maintain for Project Record Documents. 2. Store reproducible Drawings, one set of Project Manual, and one copy of each Change Order separate from documents used for construction, for use as Project Record Documents. 3. Indicate actual work on Drawings; indicate actual products used in Project Manual, including manufacturer, model number and options. 4. Update Project Record Documents daily and allow for owner inspection at least once a month. B. At Contract close-out submit documents with transmittal letter containing date, Project title, Contractor's name and address, list of documents, and signature of Contractor. C. As-Built Documents: General Contractor shall have electronic “As Built” sets of Contract Documents (Project Drawings and Project Specifications) prepared prior to Final Completion. 1. Contractor shall use one complete electronic set of Contract Documents (Drawings and Specifications) for use for “As-Builts”. 177 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 77 00 - 3 Closeout Procedures 2. As-Built Drawings: Revise Drawings based on Record Documents and field measurements made after installation and indicate actual locations of structural elements, ducts, piping, wiring, and equipment. a. Professional draftspersons experienced in electronic media used for Contract Documents shall revise original Project Drawings based on information recorded on Project Record Documents. 3. As-Built Specifications: Revise Specifications to indicate manufacturers who provided materials specified along with specifics indicating accessories, options, and finishes used in Project. a. Cross referencing Submittal records is acceptable for accessories only. 4. Review Submittal: Submit two copies of electronic media of “As-Built” Documents to owner for review. a. After owner review, revise where indicated and submit final electronic media to Owner. D. Final Completion Submittal: At Project Completion submit both Project Record Documents and As-Built Documents with transmittal letter containing date, Project title, Contractor's name and address, list of documents, and signature of Contractor. 1.5 MATERIAL AND FINISH DATA A. Provide data for primary materials and finishes. B. Submit two sets prior to final inspection, bound in 8-1/2" by 11" three-ring binders with durable plastic covers, clearly identified regarding extent of contents. 1. Electronic Format: Where available in electronic format, submit USB 3.0 flash drives with information required for material and finish data. C. Arrange by Specification division and give names, addresses, and telephone numbers of subcontractors and suppliers. List: 1. Trade names, model or type numbers. 2. Cleaning instructions. 3. Product data. 4. Maintenance recommendations. 1.6 OPERATION AND MAINTENANCE MANUALS A. Provide manuals for: 1. Electrically operated items. 2. Electrical equipment and controls. 3. Maintenance manuals provided as part of Submittals. 178 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 77 00 - 4 Closeout Procedures B. Submit two sets prior to final inspection, bound in 8-1/2" by 11" three-ring binders with durable plastic covers, clearly identified regarding extent of contents. C. Provide a separate volume for each system, with a table of contents and index tabs for each volume. D. Arrange by Specification division and gives names, addresses, and telephone numbers of Subcontractors and suppliers. List: 1. Appropriate design criteria. 2. List of equipment and parts lists. 3. Operating and maintenance instructions. 4. Shop drawings and product data. E. Electronic Format: Where available in electronic format, submit two USB 3.0 flash drives with information required for operation and maintenance manuals. END OF SECTION 179 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 78 00 - 1 Warranties SECTION 01 78 00 WARRANTIES PART 1 - GENERAL 1.1 SUMMARY A. Warranties: Compile required, and incidental warranties required by Contract Documents. 1. Manufacturer Warranties: Provide manufacturer’s standard warranties where specified including inspections and services included or required as part of manufacturer’s standard warranty. 2. Special Warranties: Provide special warranties as required by Specifications sections. 3. These warranties shall be in addition to and not a limitation of other rights Owner may have against Contractor under Contract Documents and which may be prescribed by law, regardless of wording of warranty. B. Extended Correction Period: Contractor shall correct failure of materials and systems to perform in a manner consistent with their intended use including but not limited to failure of waterproofing and roofing systems to resist penetration from water. 1. Standard Correction Period: One year after Substantial Completion or Beneficial Occupancy by Owner except where otherwise noted in Contract Documents; coordinate with General Conditions and Supplementary Conditions. a. Items used by Contractor during construction operations shall not be considered substantially completed. b. Correction of Work Period begins with notice of completion. 2. Extended Correction Period: Requirements are same as standard correction period but for an extended period as indicated in Specifications sections. 3. Contractor Responsibilities: Bear cost of correcting failed work and replacing construction damaged by failure of materials and systems to perform in a manner consistent with their intended use during correction period. a. Requirements for correction period shall apply to Subcontractors, suppliers, installers, and those responsible for failed work. b. Owner and Design Team shall not be responsible for determining degree of responsibility of those involved. 4. Owner’s Rights under Law: Correction period shall be in addition to and not a limitation of other rights Owner may have against Contractor under Contract Documents and which may be prescribed by law. 180 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 78 00 - 2 Warranties 1.2 FORM OF SUBMITTAL A. Special Warranty and Extended Correction Period Forms: Provide duplicate copies, notarized or on Contractor and Manufacturer's letterhead without conditions or exceptions to requirements specified. 1. Assemble documents executed by subcontractors, installers, suppliers, and manufacturers. 2. Provide table of contents and assemble in binder with durable plastic cover, clearly identified regarding extent of contents. 3. Electronic Format: Submit USB 3.0 flash drives of warranties, in Microsoft Word. B. Manufacturer Warranty Forms: Use manufacturer’s standard forms unless otherwise directed in Contract Documents; completed form shall not detract from or confuse interpretations of Contract Documents. 1. Manufacturer’s authorized representative shall sign manufacturer warranties. 2. Subcontractor and installer shall countersign warranty where specified. a. Provide required warranties for waterproofing and roofing systems countersigned by subcontractor and installer. C. Submit final warranties prior to final application for payment. 1. For equipment put into use with Owner's permission during construction, submit within ten days after first operation. 2. For items of Work delayed materially beyond Date of Substantial Completion, provide updated submittal within ten days after acceptance, listing date of acceptance as start of warranty period. D. Provide information for Owner's personnel regarding proper procedure in case of failure and instances that might affect validity of manufacturer warranty. E. Size: 8-1/2" by 11" for three-ring binder; fold larger sheets to fit. 1.3 WARRANTIES AND CORRECTION OF WORK DOCUMENTS A. Warranties and Correction of Work Documents are intended to protect Owner against failure of work and against deficient, defective and faulty materials and workmanship, regardless of sources. B. Limitations: Warranties and correction of work requirements are not intended to cover failures that result from: 1. Unusual or abnormal phenomena of the elements. 2. Owner's misuse, maltreatment or improper maintenance of work. 181 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 78 00 - 3 Warranties 3. Vandalism after substantial completion. 4. Insurrection or acts of aggression including war. C. Related Damages and Losses: Remove and replace work which is damaged as result of failure, or which must be removed and replaced to provide access for correction of work. D. Reinstatement: After correction of work reinstate warranty or extended correction period for corrected work to date of original expiration, but not less than half original period. 1. Correction of Work Period: The general correction of work period specified shall not be extended by corrective work except to extent required to correct failure and repair or replace materials damaged by failure. E. Replacement Cost: Replace or restore failing items without regard to anticipated useful service lives where part of correction of work period, extended correction of work period, and special warranty period unless otherwise noted. F. Rejection of Warranties: Owner reserves right to reject unsolicited and coincidental product warranties that detract from or confuse interpretations of Contract Documents. END OF SECTION 182 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 79 00 - 1 Demonstration and Training SECTION 01 79 00 DEMONSTRATION AND TRAINING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide equipment and systems demonstration and instruction in accordance with Contract Documents. 1. Video record seminars and system demonstrations. B. Related Sections: 1. Section 01 31 00: Project management and coordination. 2. Section 01 77 00: Contract closeout procedures. 3. Refer to Facility Services Subgroups for mechanical and electrical requirements. 1.2 DESCRIPTION A. Seminar Agenda and Outline: 1. Prepare a seminar agenda and outline in consultation and cooperation with Owner. Include following: a. Equipment and systems that will be included in seminars. b. Name of companies and representatives presenting at seminars. c. Outline of each seminar's content. d. Time and date allocated to each system and item of equipment. 2. Submit preliminary seminar agenda and outline for review and comment by Owner. a. Revise and resubmit agenda and outline until all seminar requirements have been satisfied and seminar dates and presenters have been finalized. 3. Submit final seminar agenda and outline no later than eight weeks before date of Acceptance of Work. B. Seminar Organization: 1. Contractor’s presentation leaders shall chair seminars. a. Coordinate qualification of training personnel, seminar contents, and presentations with Owner. 2. Coordinate individual presentations and ensure manufacturer’s representatives scheduled to be at training seminars are present. 183 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 79 00 - 2 Demonstration and Training 3. Arrange for presentation leaders familiar with design operation, maintenance and troubleshooting of equipment and systems. a. Where one person is not familiar with all aspects of equipment or system; arrange for specialists familiar with each aspect. 4. Coordinate proposed seminar dates with Owner and select mutually agreeable dates. 5. Video Recording: Arrange for video recording (audio and video) of training seminars and system demonstrations, including seminar and demonstration questions and answers. C. Seminar Content: 1. Architect’s Consultants will explain design philosophy of primary systems. 2. Include following information in presentations dealing with specific systems. a. An overview of how system is intended to operate. b. Describe design parameters, constrains and operational requirements. c. Describe system operation strategies. d. Provide information to help in identifying and troubleshooting problems. 3. Include following information in presentations dealing with equipment. a. Explanation of how equipment operates. b. Recommended preventative and routine maintenance. D. System Demonstration: 1. Demonstrate operation of equipment and systems when specified in individual technical sections. Include following in demonstration. a. Start-up and shut down. c. Operation. d. Scheduled and preventative maintenance. e. Troubleshooting. 2. Demonstration may be conducted at time of original starting with Owner's prior approval. E. Seminar and Demonstration Questions: 1. Be prepared to answer questions raised by Owner’s personnel at demonstrations and seminars. 2. If unable to satisfactorily answer questions immediately, provide written response within three days. F. Use manufacturer’s operation and maintenance data as basis of instruction. 184 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 01 79 00 - 3 Demonstration and Training 1.3 SUBMITTALS A. Video Recording: Submit three copies of each video recording in DVD format acceptable to Owner; include label on each DVD and on each container identifying Project and Seminar content. END OF SECTION 185 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 02 41 20 - 1 Selective Building Demolition SECTION 02 41 20 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Selectively remove materials, systems, components, fixtures and equipment as designated and as required for completion of Project as indicated. 1. Cap and identify active utilities. B. Related Sections: 1. Section 01 10 00: Summary of work including hazardous materials requirements. 2. Section 01 50 00: Temporary facilities including barriers and waste management. 3. Section 01 73 00: Cutting and patching. 1.2 ADMINISTRATIVE REQUIREMENTS A. Coordination: 1. Prevent movement of structural components, provide and place bracing and be responsible for safety and support of structural components. Assume liability for movement, settlement, damage or injury. 2. Cease operations and notify Architect immediately if safety of structural components appears to be endangered; take precautions to properly support structures. Do not resume operations until safety is restored. B. Design/Build: Provide special engineering to ensure compliance with applicable codes and Contract Documents for support systems. C. Scheduling: Do not close or obstruct roadways without permits. Conduct operations with minimum interference to adjacent traffic. 1.3 SUBMITTALS A. Action Submittals: Submit selective demolition operational sequence to ensure Project sequencing is consistent with Owner needs. B. Informational Submittals: Submit permits for transport and disposal of debris. Contractor to Coordinate with City and County requirements. Contractor is responsible for fees. 186 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 02 41 20 - 2 Selective Building Demolition 1.4 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control and for construction waste. PART 2 - PRODUCTS 2.1 MATERIALS A. Debris: Maintain possession of materials being demolished except where noted as a material for reinstallation or a material to be retained by Owner. Immediately remove debris from site. 1. Immediately remove from site wet materials and materials with water stains, with mold, and with mildew. B. Materials for Reinstallation: Carefully remove, store and protect materials indicated to be reinstalled. Contact Owner and Architect prior to beginning demolition to determine extent of other materials that might be suitable for reinstallation. 1. Inventory and record condition of items to be reinstalled. C. Owner Retained Materials: Contact Owner prior to beginning demolition to determine extent of materials to be retained. Carefully remove materials indicated to be retained by Owner; deliver and store where directed. 1. Inventory and record condition of items to be retained by Owner. PART 3 - EXECUTION 3.1 EXISTING SERVICES A. Disconnect or remove utility services as required for completion of Project; disconnect, stub off, and cap utility service lines not required for new construction. 1. Do not remove utilities discovered during demolition but not indicated without first determining purpose for utility; coordinate with Architect and Engineers. B. Do not disrupt services to adjacent buildings not in Project. C. Place markers to indicate location of disconnected services; identify service lines and capping locations on Project Record Documents. 3.2 DEMOLITION A. Demolish indicated appurtenances as indicated and as required for Project completion in an orderly and careful manner. 1. Use methods that do not damage materials indicated to remain. 187 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 02 41 20 - 3 Selective Building Demolition 2. Cut concrete and masonry using masonry saws and hand tools; provide sharp clean cuts requiring minimal patching for new construction. 3. Use impact tools only where specifically approved in advance for areas where operations do not disturb building occupancy. B. Perform demolition in accordance with authorities having jurisdiction. C. Remove demolished materials from site, unless otherwise directed. 1. Remove from site, contaminated, vermin infested, and dangerous materials encountered and dispose of by safe means so as not to endanger health of workers or public. D. Remove tools and equipment upon completion of work; leave area in condition acceptable to Owner and Architect. 3.3 REPAIR A. Repair damage to adjacent construction caused as result of this work, at no additional cost to the owner. B. Repair demolition beyond that required, at no additional cost to the owner. END OF SECTION 188 March 6, 2023 Ms. Jessica Sandifer, Community Services Manager City of Moorpark 799 Moorpark Avenue Moorpark, CA 93021 cball@moorparkco.gov Subject: Asbestos Survey with Lead Paint Screening Preliminary Mold & Moisture Assessment 323 Science Drive (Proposed City Hall Building) Moorpark, CA 93021 FCG Project Code: City of Moorpark-37 Dear Ms. Sandifer: FCG Environmental (FCG) conducted an asbestos survey and preliminary mold assessment at 323 Science Drive in Moorpark, California. The investigation was performed by FCG personnel on February 16, 2023, under the supervision of Alan Forbess, FCG’s Principal Consultant. Additional screening for lead paint or lead components was also conducted in selected areas. This report documents the results of our inspection and provides recommendations for corrective action as necessary. 1.0 BACKGROUND/SCOPE OF WORK According to information provided to FCG, the subject building is a two-story commercial office building constructed in 1988. The property sits on a 1.3 acre lot and is estimated at 24,464 sq. ft. The building is proposed as the new location of Moorpark City Hall. FCG was asked to conduct an inspection of s, to document site conditions and assess for potential microbial and/or moisture intrusion issues. Scope of Services: FCG conducted the following services to determine the existence of mold conditions at the site: • Visual Inspection: A visual inspection of the interior and exterior surfaces was conducted throughout the subject site, to identify areas of suspect asbestos and lead paint or lead components (ceramic tiles, porcelain fixtures, etc.). We also looked for obvious signs of water intrusion, visible mold growth, water staining, damaged building materials, odors and similar concerns related to past water intrusion issues reported by the client. • Asbestos Survey: After a visual inspection of the site was performed to identify suspect asbestos materials, a total of 42 bulk samples were collected and forwarded for analysis to a qualified asbestos laboratory. All samples were forwarded to McCall and Spero Environmental, a certified asbestos laboratory located in Louisville, KY for analysis by polarized light microscopy (PLM) umm FCG Environmental 1009 Mercer Ave. Ojai , CA 93023 Environmental Consulting Services Asbestos• Mold • Lead• Property Assessment Tel: 805.646.1995 I Fax: 805.669.3538 lnfo @fcgenviro .com I www.fcgenviro .com 189 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 2 methods to document the asbestos content in each material. Please refer to the attached laboratory analytical report for more information. • Lead Paint & Component Screening: Screening for lead-based paint and other lead materials was conducted using an X-Ray Fluorescence (XRF) field instrument to test representative surfaces in the field. Since the building was constructed after 1978 (when lead-based paint was banned from commercial and residential sales) ceramic and porcelain surfaces suspected of being coated with lead-based glazing, such as ceramic tiles and porcelain fixtures. Based on our limited XRF screening results, lead was not detected above the regulatory level of 1.0 mg/cm2 in any of the ceramic tiles and porcelain fixtures. Therefore, no special handling is required if these materials are disturbed as part of future site work. • Mold & Moisture Survey: A limited moisture survey was conducted using penetrating and radio frequency moisture meter equipment from the areas of concern, with emphasis on areas showing evidence of moisture damage, water intrusion, microbial contamination or water staining. • Mold/Fungal Sampling Assessment: Our assessment included the collection of air and surface samples to document site conditions at the time of our assessment. Samples were forwarded for analysis to Natural Link Mold Laboratory, a certified microbiology laboratory located in Sparks, Nevada. • Data Evaluation: Our field observations and analytical results have been evaluated and recommendations have been included in this report for your consideration. 2.0 ASBESTOS SURVEY Background: The subject building was reportedly constructed in 1988 which is typically beyond the date of asbestos being used in commercial and residential building materials, with few exceptions (roofing mastics, etc.). However, in order to obtain permits for removal or demolition of building materials, testing for asbestos is recommended to ensure proper handling and disposal is conducted. Suspect Materials: After a visual inspection of the site was completed, the following suspect asbestos materials were noted: • Carpet mastics – throughout all carpeted areas • Vinyl cove base with mastics (6” grey with white mastic) • Drywall with joint compound – all interior partition walls • 12” x 12” Grey vinyl floor tiles with yellow mastic (1st floor, selected locations) • 2’ x 2’ Acoustic ceiling tiles – various office areas • Ceramic wall tile grout – restrooms • Floor tile grout – restrooms • Rubberized flooring with mastics – 2nd floor closet (west) • Roofing Layers (composite or rolled roofing over felt, etc.) • Roofing mastics (used to seal around penetrations, vents, etc.) 190 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 3 Bulk Sampling Results: FCG collected 42 bulk samples from suspect asbestos containing materials from the subject site. Samples were forwarded to McCall & Spero Environmental, for analysis by Polarized Light Microscopy (PLM) using EPA Method 600/R-93-116, Visual Area Estimation. Table 1 below provides a summary of those materials which tested positive for asbestos based on laboratory analytical data from collected samples. Please refer to the Attachments for a complete copy of the laboratory analytical results. Table 1: Summary of Asbestos Bulk Sampling Results Sample ID Suspect Material Location Asbestos Results (ND = None Detected) Comments 1, 2, 19 Carpet Mastic 1st & 2nd Floors Various locations Carpet Mastic = ND No Asbestos Detected 3, 4, 20 Cove Base Mastics Lower walls throughout Grey vinyl base = ND White mastic = ND No Asbestos Detected 5 - 9, 16, 21 - 25 Drywall with joint compound Through interior partition walls Drywall = ND Joint Compound = ND No Asbestos Detected 10-12, 33-34 12” Vinyl Floor Tiles & mastic 1st Floor (NW receiving, stair landing, electrical room, etc.) Grey tiles = ND Yellow mastics = ND No Asbestos Detected 13-15, 26-29 Acoustic Ceiling Tiles (2’ x 2’) 1st floor & 2nd floor (selected office areas) Acoustic tiles = ND No Asbestos Detected 30, 31 Tile grout Restrooms (ceramic wall and floor tiles) Tile grout = ND No Asbestos Detected 32 Rubber flooring mastic 2nd floor Rubber flooring = ND White mastic = ND No Asbestos Detected 35 - 38 Roofing Layers Throughout exterior Roofing layers = ND No Asbestos Detected 39 - 42 Roofing Mastics Various penetrations (vents, piping, curbs, etc.) Roofing mastics = ND No Asbestos Detected All suspect materials identified within the subject site tested negative for asbestos. Please refer to the attached laboratory analytical report for additional information. Notes on Tables and Assessment Terms: • Asbestos containing material (ACM): Federal and County APCD regulations define ACM as any material or product that contains more than 1% asbestos. • Asbestos containing construction material (ACCM): State regulations define ACCM as any material with greater than 0.1% asbestos by weight. • Asbestos renovation: Defined by NESHAPS as the removal of more than 160 square feet or 260 linear feet of ACM. OSHA requires registration of all contractors removing more than 100 sq. ft. on any project. • Friable ACM: any ACM that when dry can be crumbled, pulverized, or reduced to powder by normal hand pressure. • Non-friable ACM: any ACM that cannot be reduced to powder by normal hand pressure. • Category I non-friable ACM: asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products (typically pliable materials, including sealants and mastics). 191 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 4 • Category II non-friable ACM: any other ACM that when dry cannot be reduced to powder by hand pressure (typically non-pliable/cementitious materials). • Regulated Asbestos Containing Material (RACM): any friable ACM that will be removed during a renovation of a regulated structure. ACM that will become friable due to the removal technique is also regulated. Note: while linoleum flooring is considered Category II ACM while managed in place, removal always renders it friable. • Presumed Asbestos Containing Materials (PACM): This designation is for those materials which are normally asbestos containing but were not sampled due to access issues or potential for irreparable damage. This typically includes transite (asbestos cement) piping or sheeting, or HVAC insulation materials in walls, under floors, etc. where destructive testing is not recommended. Regulations allow asbestos inspectors to “presume” that these materials contain asbestos without laboratory data based on the inspector’s experience and knowledge of building materials. Summary: Our survey found no asbestos in any of the bulk samples collected. Therefore, no Asbestos Containing Materials (ACM) were identified at the site which will require abatement or special handling as part of future renovation activities. 3.0 LIMITED LEAD PAINT AND COMPONENT SURVEY FCG conducted limited field screening in order to determine the presence of lead-based components (ceramic tiles, porcelain fixtures, etc.) within the subject site. As the building was constructed in 1988, there should be no lead-based paint as lead paint was banned from commercial use in 1978. Therefore, our screening for lead was limited to various components (tiles, fixtures) where lead is commonly found in glazing compounds used to seal the tiles. All work was conducted in the field using XRF methodology in accordance with current state and federal regulations. Inspection work was conducted by a Certified Lead Sampling Technician under the supervision of a CA Certified Lead Inspector/Assessor. The results of this survey are summarized in this section. Background Information on Lead Paint Requirements: Several regulations apply to the disturbance and possible exposure to lead from paints and other coatings. Title 17 of the California Code of Regulations (CCR) applies to residences and buildings accessible to the public that were constructed prior to 1979, and schools constructed before 1993 where lead paint may exist. Cal-OSHA regulations found within Title 8 of the CCR apply to worker exposure as stated in the Lead-in-Construction Standard (8- CCR-1532.1). The EPA recently issued a final rule to address lead-based paint hazards created by renovation, repair and painting activities that disturb lead-based paint in target housing and child-occupied facilities. The EPA’s Lead Renovation, Repair and Painting (RRP) Program was passed into regulation requiring compliance with training and certification requirements per Title 40 of the Code of Federal Regulations (40 CFR Part 745). The RRP rule states that firms and individuals conducting renovations of target housing constructed before 1978 must assume that lead is present in all painted surfaces or coatings unless a written determination has been made by a Certified Inspector that the components affected by the renovation are free of paint or other surface coatings that contain lead equal to or in excess of 1.0 milligrams per square centimeter (mg/cm2) or 0.5% by weight. 192 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 5 Scope of Lead Testing Services: FCG’s scope of services involved field testing through use of X-ray fluorescence (XRF) instrumentation, which provides instantaneous readings in the field. The XRF instrument is used because of its demonstrated abilities to accurately determine the amount of lead that is present without disturbing the painted surfaces, as well as their high speed and relatively low cost per sample. The XRF device is capable of measuring lead in both deteriorated and intact paint. See the Attachments to this report for more information on XRF sampling methodology. The following is a summary of our lead survey results: • None of the suspect components (tiles, fixtures, etc.) tested as part of this survey were found with lead concentrations above the regulated level of 1.0 mg/cm2. Therefore, no lead-based components were identified within the subject site. • Based on the age of the building (1988), there should be no Lead-Based Paint as these paints and coatings were banned from commercial sales in 1978. This complies with the EPA and CA Title 17 requirements for lead inspections, where inspectors and contractors must presume lead paint is present only in pre-1978 buildings. • We found no evidence of lead-based paints or lead components that will require special handling as part of proposed site renovations. Please refer to the attached spreadsheet for a summary of all XRF field readings collected from the subject site. The A side noted is the front side or main entry to the building with the B, C and D sides continuing in a clockwise direction around the site. 4.0 FIELD OBSERVATIONS During our site assessment, the following visual observations and results were noted as part of our investigation: Exterior - The structure is partially covered with vines, which can trap moisture and possibly damage the plaster exterior walls. First Floor Lobby/Hallway – Ceramic tile flooring, with drywall walls and suspended T-Bar ceilings with acoustic tiles. Air sample A-1 was found to have slight elevation of Penicillium/Aspergillus mold types. See Section 5.0 below for details on air sampling results. 193 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 6 First Floor N. Cubicle Area – Areas of water staining were noted on ceiling tiles and the lower walls (fabric) along the north side of the room. Air sample A-2 was found to have slightly elevated mold spore concentrations at the time of the inspection. See Section 5.0 for details. First Floor S Warehouse Space – This is an area of concrete flooring and walls, with open framed ceiling. Air sample A-3 was found to have slight elevation of Penicillium/Aspergillus mold types. See Section 5.0 below. First Floor S Warehouse Space – Water staining was noted on wood framing and concrete walls in the vicinity of the roof drains located in the southeast and southwest corners of the room. First Floor S Warehouse Space – Closeup view of water staining from roofing related leaks in the southwest corner. Moisture readings were within the normal, dry range (<15%) at the time. Second Floor N Cubicle Area – Areas of water staining were noted on the windowsills and lower walls (fabric covered) along the north side of the room. Air sample A-4 was found to be within outdoor/background spore concentrations inspection. See Section 5.0 for details. Second Floor N Cubicle Area – Several areas of water stained ceiling tiles were noted, indicating past roofing or other leaks. Moisture readings were within the normal, dry range (<15%) at the time. 194 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 7 2nd Floor N Cubicle Area – Water stains and visible mold growth were observed along the upper north wall area throughout, indicative of past roofing related leaks. 2nd Floor N Cubicle Area – Surface Sample T-6, collected from the top side of a ceiling tile, was found to have significant growth of Penicillium and lesser growth of Cladosporium and Alternaria mold types. See Section 6.0 below for details on surface sampling for mold. 2nd Floor N Cubicle Area – Surface Sample T-7, collected from the concrete wall above the ceiling tiles, was found to have significant growth of Cladosporium and lesser growth of Stachybotrys and Aspergillus mold types. See Section 6.0 below for details. 2nd Floor S Cubicle Area – Surface Sample T-8, collected from the fabric windowsill on the east side of the structure, was found to have significant growth of Chaetomium and lesser growth of Penicillium/Aspergillus mold types. Vinyl or fabric wallcoverings can trap moisture and result in growth on the backing drywall paper. See Section 6.0 for details 5.0 MOLD AIR SAMPLING ASSESSMENT FCG collected a total of seven (7) non-viable air samples which were forwarded for analysis to Natural Link Mold Laboratory, Inc. of Sparks, Nevada, an AIHA Laboratory with EMPAT certification (No. 162969). Six samples (A-1 thru A-6) were taken from indoor areas with one outdoor air sample (OS-1) taken for background, comparison purposes. The methods used for data interpretation are consistent with published industry documents including: Bioaerosols: Assessment and Control, published by the American Conference of Governmental Industrial Hygienist (ACGIH) 1999; and Mold Sampling and Assessment; Indoor Environmental Standard Organization (IESO), 2002. These standards are used in conjunction with our professional experience in reviewing and evaluating analytical data. The data is evaluated to review total spore counts and individual mold types to determine the hierarchy of mold species found. Ideally, indoor air spore counts should be comparable to outdoor, baseline levels with similar hierarchy or distribution of individual species. If indoor counts are significantly higher or show an 195 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 8 obvious variation with the outdoor baseline, mold amplification or growth within the interior may be indicated. Air sample data should always be evaluated in conjunction with a visual inspection, moisture readings, surface sampling and other parameters to provide an overall picture of site conditions. It is very difficult to reach conclusions based solely on air sample data. Sample collection was conducted according to standard sampling methodologies used in indoor air quality assessments for microbial investigations. This included the use of a specially designed spore trap cassette (Allergenco-D) connected to a portable vacuum pump (Zefon BioPump™) which is calibrated to 15 liters per minute. Samples are collected over a period of 5 minutes for a total sample volume of 75 liters. The cassette features an induction slit over a small glass slide which is coated with a sterile adhesive. The cassette acts as a spore trap device which traps the airborne mold spores as they are pulled into the cassette by the vacuum pump. Each collected sample is sealed, labeled with a unique identification number and forwarded to a qualified laboratory for analysis. Each sample is analyzed by direct microscopic examination by a trained microbiologist. This is a non-viable method where the analyst identifies various spore types to genus level. The following table provides a summary of the air sample results from this site. Please refer to the Attachments section for a complete copy of the laboratory analytical report. Table 2: Mold/Fungal Air Sample Results Sample ID Sample Location Total Count (s/m3) Mold Types Detected (s/m3) A-1 First Floor Lobby/Hallway 1,027 Cladosporium – 650 Penicillium/Aspergillus – 270 Basidiospores – 67 Smuts/Myxomycetes – 27 Alternaria – 13 A-2 First Floor N Cubicle Area 1,043 Basidiospores – 470 Cladosporium – 440 Scopulariopsis/Microascus – 40 Alternaria – 27 Smuts/Myxomycetes – 27 3 other mold types @ 13 A-3 First Floor S Warehouse Space 643 Basidiospores – 270 Penicillium/Aspergillus – 200 Ascospores – 67 Cladosporium – 67 3 other mold types @ 13 A-4 Second Floor N Cubicle Area 430 Basidiospores – 270 Penicillium/Aspergillus – 67 Cladosporium – 27 Rusts/Pucciniales – 27 3 other mold types @ 13 A-5 Second Floor S Cubicle Area 466 Cladosporium – 270 Basidiospores – 130 Botrytis – 53 Alternaria – 13 A-6 Second Floor Breakroom 213 Basidiospores – 200 Smuts/Myxomycetes – 13 196 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 9 Sample ID Sample Location Total Count (s/m3) Mold Types Detected (s/m3) OS-1 SE of Building Outside/Background 597 Basidiospores – 330 Smuts/Myxomycetes – 120 Penicillium/Aspergillus – 67 Alternaria – 40 Ascospores – 27 Aureobasidium – 13 All data reported in spores per cubic meter (s/m3). Please see the attached lab report for additional information. Air Sample Results Summary: • Samples A-1 and A-2 were found to have total airborne mold spore concentrations that were elevated above the outdoor background level detected at the time of our inspection (1,025 & 1,043 s/m3 inside vs. 597 s/m3 outside). • Samples A-3 through A-6 were all found to have total airborne mold spore concentrations that were below or comparable to the detected outdoor background level (213 – 643 s/m3 inside vs. 597 s/m3 outside). • The majority of the individual mold types detected in all six indoor air samples were found to be comparable to or within the corresponding background levels. A limited number of molds were detected indoors at levels above the outdoor background, but at such low levels that they should not pose a health risk or indication of indoor contamination. • One minor exception was Penicillium/Aspergillus mold types which were found to be slightly elevated in Samples A-1 & A-3, with 270 & 200 s/m3 detected vs. 67 s/m3 outside. However, the normal outdoor range for Penicillium/Aspergillus in outdoor air ranges from 107 (low) to 587 (high), with an average concentration of 213 s/m3. According to the Environmental Microbiology Laboratory (EMLab) Reference Guide™, the levels of Pen/Asp detected in Samples A-1 & A-3 are considered “Low-Medium” for CA outdoor levels (see Attachments). Based on these findings, the Penicillium/Aspergillus levels are not significantly elevated beyond what is normally found in the outdoor environment. • Penicillium and Aspergillus are distinct and separate mold genera which appear similar under direct microscopic examination methods and are therefore reported together by the laboratory analyst. Penicillium and Aspergillus are xerophilic mold species which means they can thrive in conditions with only limited water activity or available moisture, often relying solely on humidity, colonizing organic nutrients found in dust and dirt. • Although Basidiospores and Cladosporium were found to be elevated above background levels in Sample A-2 (470 s/m3 inside vs. 330 s/m3 outside for Basidiospores and 440 s/m3 inside vs. 0 s/m3 outside for Cladosporium) the detected levels of both of these mold types are considered “Low-Medium” for CA outdoor levels. Basidiospores and Cladosporium ubiquitous outdoors and not considered to be some of the more important mold types with regards to health effects. • Based on the air sampling analytical results, no concerns regarding significant airborne mold spore amplification were indicated in any of the areas tested at the time of our inspection. 197 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 10 6.0 MOLD SURFACE SAMPLING FCG collected eleven (11) surface tape-lift samples for analysis, three of which were analyzed by direct microscopic examination using non-viable or non-culturable methods. The other eight samples were put on HOLD at the laboratory pending future analysis if requested. This section provides a summary of laboratory analytical data from the analyzed samples only. Please refer to the attachments to this report for a full copy of the laboratory analytical results and a copy of the chain-of-custody showing the additional samples still on hold. Tape-lift methods use a piece of transparent adhesive tape which is affixed to the area of suspect mold growth, transferring the suspect mold spores and hyphal fragments from the surface to the tape. Samples are placed in a sealed container, labeled and forwarded to a qualified laboratory for microscopic examination by a trained mycologist. The analyst is often able to determine the presence of spores and attached hyphae or mycelium which indicates actual growth at the area of the surface tested, providing an estimate of the amount of growth on a scale of 0-5 using the following scale: Table 2: Non-Viable Surface Sample Results Sample ID Sample Location Mold Growth Observed* T-6 N Cubicle Area Top of T-bar Ceiling Tile on 2nd Floor Penicillium – 5 Cladosporium – 3 Alternaria – 1 T-7 N Cubicle Area N Concrete Wall Above Suspended Ceiling on 2nd Floor Cladosporium – 5 Stachybotrys – 3 Aspergillus – 1 T-8 S Cubicle Area E Fabric Windowsill on 2nd Floor Cladosporium – 5 Chaetomium – 4 Alternaria, Thielaviopsis – 1 Mold growth is reported using the following scale: 0 = no growth (miscellaneous spores, indicative of normal settling of air flora) 1 = sparse/minimal growth (1 -20% coverage) 2 = limited growth (21-40% coverage) 3 = moderate growth (41-60% coverage) 4 = extensive growth (61-80% coverage) 5 = nearly confluent growth (81-100% coverage) The following samples were collected during our survey and placed on hold at the laboratory: • T-1: Lobby planter box (wood) on 1st floor • T-2: NE Office, near concrete wall at NE roof drain on 1st floor • T-3: South Warehouse, lower south wall • T-4: Breakroom, acoustic ceiling tile on 1st floor • T-5: Mop closet, lower north wall on 1st floor • T-9: SW Cubicle area, fabric window sill on south wall at 2nd floor • T-10: SW corner office, drywall near roof drain chase on 2nd floor • T-11: Breakroom, west concrete wall above ceiling on 2nd floor Note: These samples can be analyzed upon request. Please call FCG for additional information. 198 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 11 Surface Sample Results Summary: • Surface sample T-6, collected from the ceiling tile in the north cubicle area, indicated nearly confluent growth of Penicillium, moderate growth of Cladosporium and sparse growth of Alternaria. • Surface sample T-7, collected from the upper concrete wall in the north cubicle area, indicated nearly confluent growth of Cladosporium, moderate growth of Stachybotrys and sparse growth of Aspergillus. • Surface sample T-8, collected from the east windowsill in the north cubicle area, indicated nearly confluent growth of Cladosporium, extensive growth of Chaetomium and sparse growth of Alternaria and Thielaviopsis. • Mold remediation is recommended based on surface sample results and visual observations of water intrusion, water damage and other evidence. 7.0 CONCLUSIONS & RECOMMENDATIONS Conclusions: FCG has completed an asbestos and lead survey of the subject site, along with preliminary mold & moisture assessment activities. Based on our observations and evaluation of laboratory analytical data, we conclude the following: • Asbestos: No asbestos was found within the subject site based on laboratory analysis of various suspect building materials. This is consistent with the age of the building, as asbestos was largely removed from commercial use at the time of building construction (~1988). No asbestos concerns were found within the subject site. • Lead Paint and Lead Components: No regulated levels of lead were detected in any of the components tested (ceramic tiles, porcelain fixtures) using XRF screening methods. Based on the age of the building (~1988), lead-based paint had been banned from commercial and residential use for approximately 10 years (1978). No lead paint or lead components were found at the subject site. • Mold & Moisture Assessment: As part of the site inspection project, FCG conducted a visual inspection for evidence of mold growth and water intrusion, with air and surface samples collected to document site conditions prior to occupancy and proposed renovations. The following is a summary of our mold and moisture assessment findings: o Water intrusion from roofing and window leaks has impacted the building, with damaged and stained areas found on both floors, primarily on the north and south sides of the building. Significant water staining was also noted in the corners of the building in the vicinity of the roof drain piping. o Water staining was noted on suspended ceiling tiles in various locations, likely the result of roofing leaks or plumbing leaks from water systems or other sources. o All moisture readings from representative surfaces and building materials were within the normal, dry range (<15% on wood scale) at the time of the inspection, indicating that building materials had dried out. 199 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 12 o Based on surface tape-lift sample results, mold growth was documented in several areas, including ceiling tiles (Sample T-6) and upper concrete walls (Sample T-7) and on fabric wall coverings on windowsill areas (Sample T-8). Additional surface samples were collected from areas of suspected mold growth and were placed on hold to stay within our original cost estimate. These samples can be analyzed upon request. o Air samples were collected from representative areas throughout the building with mold spore counts largely within the background levels found outdoors. A slight elevation of Penicillium/Aspergillus spore counts was noted in two indoor air samples on the 1st floor (A-1, lobby/hallway and A-3, warehouse), with counts of 270 and 200 respectively, vs. 67 outdoors. This may be evidence of mold growth indoors, as significant Penicillium growth was also noted on at least one surface sample. Although these findings may not pose a significant health risk to occupants, the elevated spore counts are indicative of mold amplification warranting remedial efforts to return the site to a normal background condition. Summary: Based on our preliminary investigation, no asbestos or lead conditions were found. However, water intrusion has resulted in mold growth and water damage which will warrant remediation efforts to return the site to a normal, background condition. Please see the mold remediation recommendations below and the attached Standard Mold Remediation Protocol for additional information. Mold Recommendations: Based on our field observations and laboratory results, we recommend a qualified contractor perform the following action items: Note: Recommendations are based on understanding that the interior of the site will be significantly renovated, including removal of existing ceilings, flooring, wall coverings and other finishes. We recommend that the following action items be conducted by a trained and experienced mold remediation contractor, using appropriate controls and containment to prevent cross-contamination from mold spore emissions. 1. Remove all stained and damaged acoustic ceiling tiles from areas of roofing leaks or other water intrusion. Dispose of stained or water damaged batt insulation where found. Impacted areas were noted primarily on the 2nd floor in the North cubicle area and west side in Break Room and office areas. 2. Areas of stained concrete walls should be abrasively cleaned to remove surface growth and staining. This includes the 2nd floor areas above the suspended ceiling, including north wall and west wall (break room) and 1st floor in the NE corner (near roof drain), SE and SW corners (near roof drains). 3. Areas of damaged and stained wall fabric on windowsills and other areas should be removed and the exposed substrate abrasively cleaned to remove any growth sites. 200 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 13 4. Wood framing above the suspended ceilings and the underside of the exposed roof deck should be inspected for evidence of water staining, mold growth and similar concerns. These areas should be abrasively cleaned and encapsulated as needed to abate active mold growth or water damage. All areas of active leaks must be identified with emphasis on roof drains, with repairs conducted to prevent future roof leaks. A qualified roofing contractor should be retained to inspect the roof and drainage systems and conduct repairs as necessary. 5. We recommend conducting general HEPA cleaning and air scrubbing throughout the interior areas to ensure air quality is returned to a normal, background condition. Please see the attached Standard Mold Remediation Protocol for additional details on mold remediation practices and procedures. 6. Please contact FCG Environmental for names of qualified remediation contractors or if you have any questions or concerns regarding this information. 201 FCG Environmental Asbestos, Lead & Mold Survey March 6, 2023 323 Science Drive Moorpark, CA 93021 City of Moorpark-37, 323 Science Dr., Prel Mold Asmt Rpt.doc 14 Limitations Statement The data compiled and evaluated as part of this assessment was limited and may not represent all conditions at the subject site. Mold infestation normally occurs within areas hidden from view (i.e., crawlspaces, wall cavities, plumbing chases, etc.), making it difficult to locate and define microbial contamination issues. Air and bulk sampling can provide some guidance but should not be considered definitive. This assessment reflects the data collected from specific locations tested to identify microbial conditions in those locations and therefore, should not be considered comprehensive or all encompassing. The findings from this report have been based solely upon the subjective evaluation of limited data collected during this assessment. All data collection, findings, conclusions and recommendations presented within this report are based upon limited data using current standard practices accepted within the industry. The data collected during this assessment and any resulting recommendations shall be used only by the client for the site described in this report. Any use or reliance of this report, including any of its information or recommendations by a third party without the explicit authorization of FCG or the client shall be strictly at the risk of the third party. Currently there are no federal or state standards for the assessment or abatement of microbiological contaminated sites. No acceptable thresholds or health standards have been implemented for mold exposure. Biological pollutants found at elevated concentrations have the potential to cause impacts to human health. These impacts may be limited to allergic reactions such as nasal congestion, watery eyes, runny nose, sneezing, coughing, itching or similar responses. Other responses may include fatigue, headaches, or more serious health problems such as asthma, viral infections, fevers, various forms of pneumonia, and similar respiratory problems. Responses will differ greatly between individuals depending on a number of factors, such as the sensitivity of the individual to a particular biological pollutant and their pre-existing health conditions. Forbess Consulting Group, Inc. cannot and will not provide medical advice or opinions as to the associated health problems encountered from exposure to biological pollutants. If individuals are experiencing symptoms, they should consult their personal physician or an appropriate medical care provider. If you have any questions or concerns regarding the information provided, please do not hesitate to call us at 805.646.1995. _________________________ Alan Forbess, Principal Consultant Attachments: Asbestos Laboratory Report & Bulk Sample Log Table of XRF Field Readings for Lead Mold Laboratory Analytical Report with Chain-of-Custody Field Plots showing mold sample locations, notes, etc. FCG Staff Certifications Standard Mold Remediation Protocol 202 Attachments Asbestos Laboratory Analytical Reports Table of XRF Field Readings for Lead Mold Laboratory Analytical Report Plot Plans with Field Notes FCG Staff Certifications Standard Mold Remediation Protocol 203 McCall and Spero Environmental, Inc. Specialists in Microanalysis Date: February 22, 2023 Attention: Alan Forbess FCG Environmental 1831 Will ia mson Court • Suite 100 • Lou isville, KY 4 022 3 Phone (502) 244-7135 • FAX (502) 244-7136 E-mail : customerservice@mselabs.com • Website: www.mselabs.com Subject: Analysis of bulk samples for asbestos mineral fibers by Polarized Light Microscopy (PLM) with Dispersion Staining (EPA/600/R-93/116) RE: MSE-P2173FCG Dear Mr. Forbess: City of Moorpark -37 Future City Hall Project FCG# City of Moorpark -3 7 McCall & Spero Environmental, Inc. has completed the analysis of the bulk samples we received from your offices on February 17, 2023. These samples represent the bulk samples from the City of Moorpark -37 Future City Hall Project. The PLM bulk analysis was performed according to the "M ethod of the Determination of Asbestos in Bulk Building Materials", R. L. Perkins and B. W. Harve y (EPA/600/R-93/l 16). The results for the sixty-two (62) samples are summarized in the following report. Please note that for samples consisting of two or more distinct compone nts, each component is analyzed and reported individually (EPA 40 CFR Part 61 [FRL-4821-71 ]). Thank you for cons ulting McCall & Spero Environmental, Inc. Should you have any questions concerning these results, please contact our office. Sincerely , ~~ K e vin R. Bean, B.A. PLM Laboratory Director 204 SUMMARY OF PLM BULK ANALYSIS RESULTS Page I Project Name: City of Moorpark -37 Future City Hall Project M C 11 & S E . 1 P . N MSE P2 l 73FCG C a >Pero nvironmenta ro1ect 0. - MSE # SAMPLE# ASBESTOS OTHER FIBROUS % NON -FIBROUS P2173FCG DESCRIPTION TYPE&% MATERIAL&% MATE RIAL 1 Cellulose / 5% 001 Carpet Mastic ND** Synthetics / 5% 90% 2 Cellulose / 5% 002 Carpet Mastic ND** Svnthetics / 5% 90% 3 (A) 003 (A) Cove Base ND** Cellulose / 2% 98% 3 (B) 003 (B) Mastic N D** Cellulose / 5% 95% 4 (A) 004 (A) Cove Base ND** Cellulose/ 2% 98% 4 (B) 004 (B) Mastic ND** Cellulose / 5% 95% 5 (A) 005 (A) Drywall ND Cellulose/ 10% 90% 5 (B) 005 (B) Joint Compound ND Cellulose / 5% 95% 6 (A) 006 (A) Drywall ND Cellulose / 10% 90% 6 (B) 006 (B) Joint Compound ND Cellulose/ 5% 95% 7 (A) 007 (A) Drywall ND Cellulose / 10% 90% 7 (B) 007 (B) Joint Compound ND Cellulose / 5% 95% 8 (A) 008 (A) Drywall ND Cellulose / 10% 90% 8 (B) 008 (B) Joint Compound ND Cellulose / 5% 95% 9 (A) 009 (A) Drywall ND Cellulose/ l 0% 90% COLOR Yellow Yellow Gray White Gray White White White White White White White White White White McCall & Spero Environmental, Inc. 205 MSE # P2173FCG 009 (B) 010 (A) 010 (B) 011 (A) 011 (B) 012 (A) 012 (B) 013 014 015 016 (A) 016 (B) 017 018 019 SUMMARY OF PLM BULK ANALYSIS RESULTS Page2 SAMPLE # ASBESTOS OTHER FIBROUS % NON-FIBROUS DESCRJPTION TYPE&% MATERIAL&% MATERIAL 9 (B) Joint Compound ND Cellulose I 5% 95% 10 (A) VFT ND** Cellulose/ 2% 98% 10 (B) Mastic ND** Cellulose / 5% 95% 11 (A) VFT ND** Cellulose I 2% 98% 11 (B) Mastic ND** Cellulose I 5% 95% 12 (A) VFT ND** Cellulose I 2% 98% 12 (B) Mastic ND** Cellulose I 5% 95% 13 Cellulose I 20% Ceiling Tile ND Glass/ 30% 50% 14 Cellulose I 20% Ceiling Tile N D Glass/ 30% 50% 15 Cellulose/ 20% Ceiling Tile ND Glass / 30% 50% 16 (A) Drywall ND Cellulose / 10% 90% 16 (B) Joint Compound ND Cellulose / 5% 95% 17 Grout ND** Cellulose/ 3% 97% 18 Grout ND** Cellulose I 3% 97% 19 Cellulose/ 5% Carpet Mastic ND** Synthetics / 5% 90% COLOR White Grav Yellow Gray Yellow Gray Yellow Tan Tan Tan White White Gray Gray Yellow McCall & Spero Environmental, Inc. 206 MSE # P2173 FCG 020 (A) 020 (B) 021 (A) 021 (B) 022 (A) 022 (B) 023 (A) 023 (B) 024 (A) 024 (B) 025 (A) 025 (B) 026 027 028 SUMMARY OF PLM BULK ANALYSIS RESULTS Page 3 SAMPLE# ASBESTOS OTHER FIBROUS % NON-FIBROUS DESCRIPTION TYPE&% MATERIAL&% MATERIAL 20 (A) Drywall ND** Cellulose/ 10% 90% 20 (B) Joint Compound ND Cellulose / 5% 95% 21 (A) Drywall N D Cellulose/ 10% 90% 21 (B) Joint Compound ND Cellulose/ 5% 95% 22 (A) Drywall ND Cellulose / 10% 90% 22 (B) Joint Compound ND Cellulose / 5% 95% 23 (A) Drywall ND Cellulose I l 0% 90% 23 (B) Joint Compound N D Cellulose / 5% 95% 24 (A) Drywall ND Cellulose / I 0% 90% 24 (B) Joint Compound ND Cellulose / 5% 95% 25 (A) Drywall ND Cellulose / 10% 90% 25 (B) Joint Compound ND Cellulose I 5% 95% 26 Cellulose I 20% Ceiling Tile ND Glass/ 30% 50% 27 Cellulose / 20% Ceiling Tile ND Glass / 30% 50% 28 Cellulose I 20% Ceiling Tile ND Glass/ 30% 50% COLOR White White White White White White White White White White White White White White White McCall & Spero Environmental, Inc. 207 MSE # P2 173FCG 029 030 031 032 (A) 032 (B) 033 (A) 033 (B) 034 (A) 034 (B) 035 036 037 038 039 040 SUMMARY OF PLM BULK ANALYSIS RESULTS Page4 SAMPLE# ASBESTOS OTHER FIBROUS % NON-FIBROUS DESCRIPTlON TYPE&% MATERIAL&% MATERIAL 29 Cellulose/ 20% Ceiling Tile ND Glass/ 30% 50% 30 Grout ND** Cellulose/ 3% 97% 31 Grout ND** Cellulose/ 3% 97% 32 (A) Rubber Floor ND** Cellulose I 3% 97% 32 (B) Mastic ND** Cellulose/ 5% 95% 33 (A) VFT ND** Cellulose I 2% 98% 33 (B) Mastic ND** Cellulose / 5% 95% 34 (A) VFT ND** Cellulose/ 2% 98% 34 (B) Mastic N D** Cellulose/ 5% 95% 35 Cellulose / 10% Roof Layer ND** Glass/ 10% 80% 36 Cellulose / 10% Roof Layer ND** Glass/ 10% 80% 37 Cellulose/ 10% Roof Layer ND** Glass / 10% 80% 38 Cellulose / 10% Roof Layer ND** Glass / 10% 80% 39 Roof Mastic ND** Cellulose / 5% 95% 40 Roof Mastic ND** Cellulose / 5% 95% COLOR White Gray Gray Gray White Gray Yellow Gray Yellow Black Black Black Black Black Black McCall & Spero Environmental, Inc. 208 MSE # P2173FCG 041 042 NOTES: ND = None Detected CR = Crocidolite SUMMARY OF PLM BULK ANALYSIS RESULTS Page 5 SAMPLE # ASB E STOS OTHER FIBROUS % NON-FIBROUS DESCRIPTION TYPE&% MATERIAL&% MATER[AL 41 Roof Mastic ND** Cellulose / 5% 95% 42 Roof Mastic ND** Cellulose / 5% 95% CH = Chrysotile A = Amosite AC = Actinolite AN = Anthophyllite TR= Tremolite COLOR Black Black For samples consisting of separate components, each component is analyzed and reported separately. Results apply only to items tested. Quantification is accurate to within ± 10%. Results from this report must not be reproduced, except in full , with the approval of McCall & Spero Environmental, Inc. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. ** EPA recommends that bulk materials found negative for asbestos or less than one percent asbestos by polarized light microscopy that fall into one of five dominantly nonfriable categories be reanalyzed by an additional method, such as transmission electron microscopy. (EPA Notice of Advis ory, FR Vol. 59, No. 146 & Test Method EPA 600/ R-93/ l 16). Analyst: Taylor B Parmly 1 C\@D \ ~ ®j McCall & Spero Environmental, Inc. 209 McCall and Spero c ,·t" -r t9li In Williamson Court• Suite 100 • Louisv ille, KY 40223 Phone (502) 244-7135 • FAX (502) 244 -7 136 Specialists in M icroanalysis E-mail: customerservice@mselabs.com • Website: www.mselabs.com BULK SAMPLE CHAIN OF CUSTODY FORM Company: Fe& £tvV1✓2'u,v,;'1'£.V14-l--Telephone# fo~ (1/6-/'l 'JS-Fax#: Contact: .4L4N ;=v;e,a ~S S Client Project Number: CIT oP ,A?c oll.f'/.1:l!,/c· Relinquished by: _______________ Date: 2/ / t:/ 2 T ime: 3 :-o ,, WrittenReportTo: ,/fro/c.(5£..5.-.S t:_ /=-CGCtV(,/1/cD ·C6r"J, Project Name: C'/7' or-/?7PPr't.lnlZ/c, S 7 h:,,1v/Zc Ct 'rl.. /+4-L L Turn-Around (Circle One): Same Day 24 Hour ~ 4-5 Day Weekend Rush After Hour Rush Anal sis Re uested Circle One : LM Bulk Anal sis TEM Qualitative Anal sis TEM uantitative Anal sis 4-5 Da For laboratory Use 011/y MSE Projec; # Y2. \] tJf C{Q Samples Received by: _} ... ~------------- Method: EPA/600/R-93/116 Date: 2 I \1 !23 Time: \ONA Client Sample Location Sample Desc.-iption Sampled By Number J-'-12 .S ~ £ ~--r4c11£D WG-S 210 /o,cy FCG Environmental Inc. Asbestos Bulk Sampling Field Log Date: 2/16/23 Client: crry c t= /'1tJ<7/Z/'1A~K... Site: J'23 Sc., E IV((. 01<.. Project: c, ry of!' />I v()/2!1PlP -5 7 lnspector(s): w n /!Sr- Area/Unit: Sample• Material-Samaili location t G4~E:'.;-/J'Ms7iL , ..s ·r ~f.h;,,/6 £.IJ(,)P-1 ,:LA()/l_ 2 ), ~l. ) ,JC g ..,1..<-P~ a '2.£4 3 ~ 11 G/2.C y c v-./Cf?AS'i w/ .,-:12A--. !V • IV f. 12..o v ~ M/'J':rn L 'f '-)~ l N S:. (? ...._p '!C\.i ,.q,uA -w / ::IlJ, ,vr ' s P12V i..J.Q z..L-('o /1"),t' /Yl. f.,.✓ $ R_f. S T rZ...c Q"l-\ t \ \ l,N o .('),J c.,,./ s eL i •nz .. , =-~ 7 J tJ£ (3J_\...{)£._,v 4'2~ ~ ( I l'J!A) R'c... ~ i V 1,,J 6 .i_.., i) ,..,,..._ 7 I _L, I,,~ S F f2.\J<.R.... e_0of1-1 / () /I V'-"1/YY\--3',;-L I\JW /l_E.C...£1 ✓JtVC::. !m--:1 ; ?... vr-7 Ga.LY ' ' ' II I f.J w ..s ;"A-d i... CA,J P .. ;v 6 I I j I z__ ) /'.<.u .;>r.., <-, r,., . ..,. ...L \i~ ~ {2_1C. 1-1\l pVl, Friable: Friability Codes: N=Non-friab1e; F=Friable Cond: Condition Codes: G=Good; F=Fair; P=Poor Quantity ""T"'/o ) -- T7.::> \ I ( \ J i<i"D Sr- I • _J l !/ NA=Not Analyzed ND=Detected N=Negative ~ Alu w .S~,(2 (AtvO,r/CI { iA-z..t..-'{_ N W Q[c f,\.4 N6 frlablllty f') .... \ \ I ) \ ~ 'J 6 \ \ I I ) . J . 211 FCG Environmental Inc. Asbestos Bulk Sampling Field Log Date: 2//6/Z..5 Client: c ,,../ or ,-»ot,/l..~1L Site: 3 2-'3 sc 1LA1L c ,cYZ-. Project: C117 of !"111 v1t#.YZL-~7 lnspector(s ): lv'l""1 I ~p Area/Unit: :_,..,:_I llaterlal __ ..:_: )] . 01?...oP C'£,/t..;N£ 2)(2 T1, .. :,;:.s I'-/ ) \ 1S-J_ 1, /6 w{ ;rr, .. v, ()12.YvJAu.-t"O r?1 (). . 17 ... ~~ Tl(.(. 6/2.0v, IY FL.c v e----n1-e. 6 /LcD-r- /7 • C/.+1Z~ ,-,/'J'v'H r, L 2v .. , c O v"€ ~ l. W ( b G (lE,-/ .M~ rJ I 2i C>r<yw4<...t,.. (,..I/ ✓ChN ,- co ff}f? 22 ."'\ \ 23 / I l -zy .... L, \ ..._ ,_ I ... Location /S, T/2,4-,,,/JN & QL·O /)'\ Ft-ootZ.. ) €,{Ut:l I<:.. /2,::,o /1-\. I .1,-fZV)- ..... .ti' NG-B v u..Puv I Nf.. ~Ft<..c:r '-'4-L-<-- \ 12.£5~D ~ fYJ(NS '/ .l l 2µ0 Ft .nuc'L S w of>~ or-F,c.z ' .... :7 --' ~ I 'S,.b t:J71./ <·o fllt=" /2!>1 . ' ' fYJ ,(!11£ ll.£~7/l,.,~ M Friable: Friability Codes: N=Non-friable; F=Friable Cond: Condition Codes: G=Good; F=Fair; P=Poor --·--- r-/~ \ ~ -r70 ,-/. ... T/o I IC) ' \ I NA=Not Analyzed ND=Detected N=Negative .. Area . - 12. (5 ;-,z_ 0 i).,., s k e£~;""'2..oont5 4 '-'4-t:-L..-I!"'~-- Frlabllity r- ' l I\ i ) j ,, ,.., . I \ ' \ .1 w~/J'J~f'\J-J ~~:-a..:..,.,,.11 j/ .L Concllllon 6 \ l c.. 1 \ I ( -\ I j ' .... i.-- 212 FCG Environmental Inc. Asbestos Bulk Sampling Field Log Date: 2//6/23 Client: c/TY vr-J?tc,v;t,~l<C- Site: 52'3 ~C I 'i.ll/ C. .£ 1)12 . Project: (/ r--y o I'" l)1ov£. t;,q...'2./,? -:? 7 lnspector(s): J,,v /1'? I z.,c Area/Unit: -• • Matertal-. . SamDle Location 2:;-t./ I J1J /IV,--::zµo IV£ [5.,..LfJOV Dl<.'/t,,A,1,,,__ c'v -,,,P . Pl-i:otl. -/.lQ...-(..4 26 ' 0 /ltJI° C£.,c.,,,,v-i ' 2x2 -r, L <. .S I SfN' 6P-r/(_£ 27 \ ) .5o t/ '"i7 I f3vuPu/ ~{./1 Zfr ( '£Lf-v/J,-;-zfi.. l-/.✓-Y L l.. zJ l j/ ;v 1£_ /?viL ?z-n/ 1¥-i:A ..... "' Jo "1.J,4-1./4.,, T7L~ CtZa v r ) ,. /J1&-v..J /Lf.ST_t2c.,c/Vf. 71 0 c:(2.. 7h.<£ 6/2.11;)1 ( i j_ 72 R. uBBfa. H,..;dl, ,., 6 i .J ( (Ylllt.$,., l ) ---J\_/ W'L.> I C't-.:JS4... ,- ?3 ,"r 6--'/ "I ST E <-E c. , fl. u i,/1--1 12 &/(.[7 vrr ~PL r(.,.1;,, .. ,7 5/ -i -b I. ~ 3'~ /2-ooP l,A.7'1ue,_g ._§t h> 7)-f c'cv'O 36 -t-j_ Mu:? ,v,oP Friable: Friability Codes: N=Non-friable; F=Friable Cond: Condition Codes: G=Good; F=Fair; P=Poor QuaniiiY Tlo ' I I J l -...J / ;::.. f/o -=j )J-? 7/o ~ /2a SP i T/0 j_ NA=Not Analyzed ND=Detected N=Negative . ·---=Area I p_ brfZ..,c.. ,,,_,...5 Qt.,S ;-;z_J ._,r,,, ~ ( Q..ei:-~ f!_...,;,r>'\. C' L-v.S E";--s F, .. IV r- \ t IV .. ...,, I -t Condition d G '\ I :, c; ) j~ r l F l 213 FCG Environmental Inc. Asbestos Bulk Sampling Field Log Date: 2//612..< Client: C';Tyo~ /J7 o(.)/l P4--'2-r<!.. Site: s27 SC. (£N C[_ 012... Project: ~,r7 oP /71ooltf.?Afl. 1-L--5 I lnspector(s): l,//>t / -;r/7" Area/Unit: -. --Location 37 /u.,u~ tA-7&2..S fvC/1.,,7rf-~D 3? l -l. l,,v £SI~-;-t<fa-l,L,, ?3 12..ao /> /1'1/.f;S T7 L, f, f> t Pct'-1 .1 TW-Frro .. v y'Q '\ \ P, iZlf Poc,L~r(' '11 J / Cv<LO ~11c l/2 I /Jr¥2A f'f: .. -W,,,tf <-l--1 0 ~ ~ -.... v I m,,q;f1/(.. Friable: Friability Codes: N=Non-friable; F=Friable Cond: Condition Codes: G=Good; F=Fair; P=Poor . -r70 J_ 60 SP. 2c.t $f=. 770 Sf' Soc, L<- I NA=Not Analyzed ND=Detected N=Negative -· ArN . ,PiPE / l}i:.rvTJ ~. <' i ~.,,J , Sca.Ucv ~ ... P!'ut:..7'!. C v/Z.t:, S (?,!:'AD 6 r ..:, WA--< ft, p 'lz .,'-,t:I'> I Frtablllty ,J ) -r \ ~ Condlllon p \ \ I J ( ~ 214 Table of XRF Lead Readings 323 Science Drive Moorpark, CA 93021 1 Component Substrate Side Condition Color Floor Area Results Lead Mg/cm2 CALIBRATE Positive 1.1 CALIBRATE Positive 1 CALIBRATE Positive 1.1 WALL CERAMIC TILE A INTACT LIGHT PINK FIRST WOMENS HALLWAY RR Negative 0 WALL CERAMIC TILE A INTACT PURPLE ACCENT FIRST WOMENS HALLWAY RR Negative 0.01 FLOOR CERAMIC TILE A INTACT PURPLE FIRST WOMENS HALLWAY RR Negative 0 FLOOR CERAMIC TILE A INTACT LIGHT PINK ACCENT FIRST WOMENS HALLWAY RR Negative 0 SINK PORC C INTACT WHITE FIRST WOMENS HALLWAY RR Negative 0.01 TOILET PORC C INTACT WHITE FIRST WOMENS HALLWAY RR Negative 0 TOILET PORC A INTACT WHITE FIRST MENS HALLWAY RR Negative 0.02 URINAL PORC A INTACT WHITE FIRST MENS HALLWAY RR Negative 0 SINK PORC A INTACT WHITE FIRST MENS HALLWAY RR Negative 0 WALL CERAMIC TILE C INTACT LIGHT GREY FIRST MENS HALLWAY RR Negative 0 WALL CERAMIC TILE C INTACT DARK GREY ACCENT FIRST MENS HALLWAY RR Negative 0.01 FLOOR CERAMIC TILE C INTACT BLUE FIRST MENS HALLWAY RR Negative 0 FLOOR CERAMIC TILE C INTACT LIGHT PURPLE ACCENT FIRST MENS HALLWAY RR Negative 0.03 FLOOR CERAMIC TILE C INTACT BLUE FIRST HALLWAY MOP CLOSET Negative 0 MOP SINK PORC C INTACT WHITE FIRST HALLWAY MOP CLOSET Negative 0 WALL DRYWALL D INTACT WHITE FIRST HALLWAY MOP CLOSET Negative 0 FLOOR CERAMIC TILE D INTACT LIGHT GREY FIRST HALLWAY Negative 0 FLOOR CERAMIC TILE D INTACT DARK GREY FIRST BREAK ROOM Negative 0.03 FLOOR CERAMIC TILE D INTACT OFF-WHITE ACCENT FIRST BREAK ROOM Negative 0.01 FLOOR CERAMIC TILE A INTACT BLUE ACCENT FIRST LOBBY Negative 0 FLOOR CERAMIC TILE A INTACT LIGHT GREY FIRST LOBBY Negative 0.02 FLOOR CERAMIC TILE A INTACT DARK GREY SECOND EXECUTIVE RR Negative 0 WALL CERAMIC TILE A INTACT DARK GREY SECOND EXECUTIVE RR Negative 0 FLOOR CERAMIC TILE A INTACT DARK BLUE ACCENT SECOND EXECUTIVE RR Negative 0 TOILET PORC A INTACT WHITE SECOND EXECUTIVE RR Negative 0 215 Table of XRF Lead Readings (Continued) 323 Science Drive 2 Component Substrate Side Condition Color Floor Area Results Lead Mg/cm2 SINK PORC D INTACT WHITE SECOND EXECUTIVE RR Negative 0.02 SINK PORC D INTACT WHITE SECOND HALLWAY WOMENS RR Negative 0 TOILET PORC D INTACT WHITE SECOND HALLWAY WOMENS RR Negative 0.01 WALL CERAMIC TILE D INTACT LIGHT PINK SECOND HALLWAY WOMENS RR Negative 0.01 WALL CERAMIC TILE D INTACT PURPLE ACCENT SECOND HALLWAY WOMENS RR Negative 0.02 FLOOR CERAMIC TILE D INTACT PURPLE SECOND HALLWAY WOMENS RR Negative 0 FLOOR CERAMIC TILE D INTACT BEIGE ACCENT SECOND HALLWAY WOMENS RR Negative 0.02 FLOOR CERAMIC TILE D INTACT DARK PINK SECOND MOP CLOSET Negative 0 MOP SINK PORC C INTACT WHITE SECOND MOP CLOSET Negative 0 WALL DRYWALL C INTACT WHITE SECOND MOP CLOSET Negative 0 CEILING DRYWALL C INTACT WHITE SECOND HALLWAY MENS RR Negative 0 WALL CERAMIC TILE C INTACT LIGHT BLUE SECOND HALLWAY MENS RR Negative 0.01 WALL CERAMIC TILE C INTACT DARK BLUE ACCENT SECOND HALLWAY MENS RR Negative 0.01 FLOOR CERAMIC TILE C INTACT GREY SECOND HALLWAY MENS RR Negative 0 FLOOR CERAMIC TILE C INTACT WHITE ACCENT SECOND HALLWAY MENS RR Negative 0.01 SINK PORC A INTACT WHITE SECOND HALLWAY MENS RR Negative 0.01 URINAL PORC A INTACT WHITE SECOND HALLWAY MENS RR Negative 0 TOILET PORC A INTACT WHITE SECOND HALLWAY MENS RR Negative 0.02 FLOOR CERAMIC TILE A INTACT LIGHT GREY SECOND BREAKROOM Negative 0 FLOOR CERAMIC TILE A INTACT DARK GREY ACCENT SECOND BREAKROOM Negative 0 CALIBRATE Positive 1.1 CALIBRATE Positive 1.1 CALIBRATE Positive 1.1 216 56222 Bioaerosol, non-culturable Tape Sample Fungal Microscopic Exam Fungal Microscopic Exam 56222-R01 56222-R02 City of Moorpark - 37 02-17-2023 February 17, 2023 Blake Forbess FCG Environmental 1009 Mercer Avenue Ojai, California 93023 Ph. (805) 646-1995 Analytical Laboratory Report FINAL REPORT Project/PO: Control ID # Laura Parsons, Technical Director Natural Link Mold Lab 1320 Freeport Blvd #104, Sparks NV 89431 Report submitted to: Natural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Received: AIHA Lab ID 101754 217 Analytical Laboratory Report Bioaerosol, non-culturable Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Account Name: Blake ForbessSubmitter: Project PO:02-17-2023Date Received: 56222Control ID #: Date Reported: Sample Identification: City of Moorpark - 37 FCG Environmental 02-17-2023 Fungi Identified Sample Count (spores/sample)Calculated Count (spores/m3) A-1. Lobby / Hallway 1st Floor; Allergenco-D Spore-trap; 75L; 2-16-2023 [S216191AA155982] 49 650Cladosporium 20 270Penicillium/Aspergillus 5 67Basidiospores 2 27Smuts/Myxomycetes 1 13Alternaria Other Airborne Particles Hyphal fragments Pollen Insect/arthropod parts Fiberglass particles Total biological particles Total non-biological particles None Detected Detected /None Detected Particle Density (1-5) TOTAL Detected None Detected Detected 2 3 77 1 027 • Dominant fungal spores detected on the sample: Cladosporium. • Sensitivity: 13 spores/cubic meter. • See Summary Table (56222-R01A). Summary of Findings Report #:R01 Analysis Date:02-17-2023 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation, health effects, or other information given to the client, beyond microbial identification, is given as general information from published sources and is not an extension of liability to Natural Link MOLD LAB Natural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associated with the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 1 56222- ----------------- 218 Analytical Laboratory Report Bioaerosol, non-culturable Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Account Name: Blake ForbessSubmitter: Project PO:02-17-2023Date Received: 56222Control ID #: Date Reported: Sample Identification: City of Moorpark - 37 FCG Environmental 02-17-2023 Fungi Identified Sample Count (spores/sample)Calculated Count (spores/m3) A-2. North Cubicle Area - 1st Floor; Allergenco-D Spore-trap; 75L; 2-16-2023 [S216192AA155983] 35 470Basidiospores 33 440Cladosporium 3 40Scopulariopsis/Microascus 2 27Alternaria 2 27Smuts/Myxomycetes 1 13Aureobasidium 1 13Botrytis 1 13Yeasts Other Airborne Particles Hyphal fragments Pollen Insect/arthropod parts Fiberglass particles Total biological particles Total non-biological particles Detected Detected /None Detected Particle Density (1-5) TOTAL None Detected Detected Detected 3 3 78 1 043 • Dominant fungal spores detected on the sample: Basidiospores and Cladosporium. • Sensitivity: 13 spores/cubic meter. • See Summary Table (56222-R01A). Summary of Findings Report #:R01 Analysis Date:02-17-2023 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation, health effects, or other information given to the client, beyond microbial identification, is given as general information from published sources and is not an extension of liability to Natural Link MOLD LAB Natural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associated with the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 2 56222- ----------------- 219 Analytical Laboratory Report Bioaerosol, non-culturable Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Account Name: Blake ForbessSubmitter: Project PO:02-17-2023Date Received: 56222Control ID #: Date Reported: Sample Identification: City of Moorpark - 37 FCG Environmental 02-17-2023 Fungi Identified Sample Count (spores/sample)Calculated Count (spores/m3) A-3. South Warehouse Space - 1st Floor; Allergenco-D Spore-trap; 75L; 2-16-2023 [S216193AA155984] 20 270Basidiospores 15 200Penicillium/Aspergillus 5 67Ascospores 5 67Cladosporium 1 13Aureobasidium 1 13Botrytis 1 13Periconia Other Airborne Particles Hyphal fragments Pollen Insect/arthropod parts Fiberglass particles Total biological particles Total non-biological particles None Detected Detected /None Detected Particle Density (1-5) TOTAL Detected None Detected None Detected 2 2 48 643 • Dominant fungal spores detected on the sample: Basidiospores and Penicillium/Aspergillus. • Sensitivity: 13 spores/cubic meter. • See Summary Table (56222-R01A). Summary of Findings Report #:R01 Analysis Date:02-17-2023 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation, health effects, or other information given to the client, beyond microbial identification, is given as general information from published sources and is not an extension of liability to Natural Link MOLD LAB Natural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associated with the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 3 56222- ----------------- 220 Analytical Laboratory Report Bioaerosol, non-culturable Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Account Name: Blake ForbessSubmitter: Project PO:02-17-2023Date Received: 56222Control ID #: Date Reported: Sample Identification: City of Moorpark - 37 FCG Environmental 02-17-2023 Fungi Identified Sample Count (spores/sample)Calculated Count (spores/m3) A-4. North Cubicle Area - 2nd Floor; Allergenco-D Spore-trap; 75L; 2-16-2023 [S216194AA155985] 20 270Basidiospores 5 67Penicillium/Aspergillus 2 27Cladosporium 2 27Rusts/Pucciniales 1 13Alternaria 1 13Scopulariopsis/Microascus 1 13Smuts/Myxomycetes Other Airborne Particles Hyphal fragments Pollen Insect/arthropod parts Fiberglass particles Total biological particles Total non-biological particles Detected Detected /None Detected Particle Density (1-5) TOTAL Detected Detected Detected 3 4 32 430 • Dominant fungal spores detected on the sample: Basidiospores. • Sensitivity: 13 spores/cubic meter. • See Summary Table (56222-R01A). Summary of Findings Report #:R01 Analysis Date:02-17-2023 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation, health effects, or other information given to the client, beyond microbial identification, is given as general information from published sources and is not an extension of liability to Natural Link MOLD LAB Natural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associated with the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 4 56222- ----------------- 221 Analytical Laboratory Report Bioaerosol, non-culturable Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Account Name: Blake ForbessSubmitter: Project PO:02-17-2023Date Received: 56222Control ID #: Date Reported: Sample Identification: City of Moorpark - 37 FCG Environmental 02-17-2023 Fungi Identified Sample Count (spores/sample)Calculated Count (spores/m3) A-5. South Cubicle Area - 2nd Floor; Allergenco-D Spore-trap; 75L; 2-16-2023 [S216195AA155986] 20 270Cladosporium 10 130Basidiospores 4 53Botrytis 1 13Alternaria Other Airborne Particles Hyphal fragments Pollen Insect/arthropod parts Fiberglass particles Total biological particles Total non-biological particles Detected Detected /None Detected Particle Density (1-5) TOTAL Detected None Detected None Detected 2 3 35 466 • Dominant fungal spores detected on the sample: Cladosporium. • Sensitivity: 13 spores/cubic meter. • See Summary Table (56222-R01A). Summary of Findings Report #:R01 Analysis Date:02-17-2023 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation, health effects, or other information given to the client, beyond microbial identification, is given as general information from published sources and is not an extension of liability to Natural Link MOLD LAB Natural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associated with the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 5 56222- ----------------- 222 Analytical Laboratory Report Bioaerosol, non-culturable Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Account Name: Blake ForbessSubmitter: Project PO:02-17-2023Date Received: 56222Control ID #: Date Reported: Sample Identification: City of Moorpark - 37 FCG Environmental 02-17-2023 Fungi Identified Sample Count (spores/sample)Calculated Count (spores/m3) A-6. Breakroom - 2nd Floor; Allergenco-D Spore-trap; 75L; 2-16-2023 [S216196AA155987] 15 200Basidiospores 1 13Smuts/Myxomycetes Other Airborne Particles Hyphal fragments Pollen Insect/arthropod parts Fiberglass particles Total biological particles Total non-biological particles Detected Detected /None Detected Particle Density (1-5) TOTAL None Detected None Detected None Detected 2 2 16 213 • Dominant fungal spores detected on the sample: Basidiospores. • Sensitivity: 13 spores/cubic meter. • See Summary Table (56222-R01A). Summary of Findings Report #:R01 Analysis Date:02-17-2023 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation, health effects, or other information given to the client, beyond microbial identification, is given as general information from published sources and is not an extension of liability to Natural Link MOLD LAB Natural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associated with the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 6 56222- ----------------- 223 Analytical Laboratory Report Bioaerosol, non-culturable Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Account Name: Blake ForbessSubmitter: Project PO:02-17-2023Date Received: 56222Control ID #: Date Reported: Sample Identification: City of Moorpark - 37 FCG Environmental 02-17-2023 Fungi Identified Sample Count (spores/sample)Calculated Count (spores/m3) OS-1. Outside - SE of Building; Allergenco-D Spore-trap; 75L; 2-16-2023 [S216197AA155988] 25 330Basidiospores 9 120Smuts/Myxomycetes 5 67Penicillium/Aspergillus 3 40Alternaria 2 27Ascospores 1 13Aureobasidium Other Airborne Particles Hyphal fragments Pollen Insect/arthropod parts Fiberglass particles Total biological particles Total non-biological particles None Detected Detected /None Detected Particle Density (1-5) TOTAL Detected None Detected Detected 3 2 45 597 • Dominant fungal spores detected on the sample: Basidiospores. • Sensitivity: 13 spores/cubic meter. • See Summary Table (56222-R01A). Summary of Findings Report #:R01 Analysis Date:02-17-2023 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation, health effects, or other information given to the client, beyond microbial identification, is given as general information from published sources and is not an extension of liability to Natural Link MOLD LAB Natural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associated with the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 7 56222- ----------------- 224 02-17-2023 56222 FCG Environmental City of Moorpark - 37 Alternaria Ascospores Aureobasidium Basidiospores Botrytis Cladosporium Penicillium/Aspergillus Periconia Rusts/Pucciniales Scopulariopsis/Microascus Smuts/Myxomycetes Yeasts Fungal Microscopic Examination Bioaerosol, non-culturable Page 1 of 1Report # 56222-R01A Control # Account Name Project/P.O.:Date Reported A-1. Lobby / Hallway 1st Floor A-2. North Cubicle Area - 1st Floor A-3. South Warehouse Space - 1st Floor A-4. North Cubicle Area - 2nd Floor A-5. South Cubicle Area - 2nd Floor A-6. Breakroom - 2nd Floor OS-1. Outside - SE of Building Summary Table Fungi ID 13 67 650 270 27 27 13 470 13 440 40 27 13 67 13 270 13 67 200 13 13 270 27 67 27 13 13 13 130 53 270 200 13 40 27 13 330 67 120 1 043 643 430 466 213 5971 027 1 % 7 % 63 % 26 % 3 % 3 % 1 % 45 % 1 % 42 % 4 % 3 % 1 % 10 % 2 % 42 % 2 % 10 % 31 % 2 % 3 % 63 % 6 % 16 % 6 % 3 % 3 % 3 % 28 % 11 % 58 % 94 % 6 % 7 % 5 % 2 % 55 % 11 % 20 % Spores / cubic meter Spores / cubic meter Spores / cubic meter Spores / cubic meter Spores / cubic meter Spores / cubic meter Spores / cubic meter % of total % of total % of total % of total % of total % of total % of total Sample ID TA40142 Natural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. Natural Link Mold Lab, 1320 Freeport Blvd., #104, Sparks, NV 89431 225 Tape Sample Analytical Laboratory Report Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. T-6. North Cubicle Area, Top of T-Bar Ceiling Tile - 2nd Floor; Tape Sample; 2-16-2023 [S216203AB27329] FCG EnvironmentalAccount Name: Blake ForbessSubmitter: City of Moorpark - 37Project PO:02-17-2023Date Received: 56222Control ID #: 02-17-2023Date Reported: Sample Identification: Summary of Findings s Dominant fungi detected on sample: Penicillium Macroscopic Observations: s Grey colored material present on sample. s Density: Medium. Microscopic Observations: s See Summary Table (56222-R02A). s s Nearly confluent growth; spores and hyphae detected. s Fungal growth detected: Cladosporium. s Moderate growth; spores and hyphae detected. s Fungal growth detected: Alternaria. s Sparse/minimal growth; . s Fiberglass particles detected. Fungal growth detected: Penicillium. Report #:56222-R02 Analysis Date:02-17-2023 RB27329 1 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation,health effects, or other information given to the client, beyond microbial identification, is given as general info from published sources and is not an extension of liability to Natural Link MOLD LABNatural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associatedwith the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 226 Tape Sample Analytical Laboratory Report Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. T-7. North Cubicle Area / North Concrete Wall Above Drop - 2nd Floor; Tape Sample; 2-16-2023 [S216204AB27330] FCG EnvironmentalAccount Name: Blake ForbessSubmitter: City of Moorpark - 37Project PO:02-17-2023Date Received: 56222Control ID #: 02-17-2023Date Reported: Sample Identification: Summary of Findings s Dominant fungi detected on sample: Cladosporium Macroscopic Observations: s Black colored material present on sample. s Density: Heavy. Microscopic Observations: s See Summary Table (56222-R02A). s s Nearly confluent growth; spores, conidiophores and hyphae detected. s Fungal growth detected: Stachybotrys. s Limited growth; spores and hyphae detected. s Fungal growth detected: Aspergillus. s Sparse/minimal growth; spores, conidiophores and hyphae detected. s Fiberglass particles detected. Fungal growth detected: Cladosporium. Report #:56222-R02 Analysis Date:02-17-2023 RB27330 2 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation,health effects, or other information given to the client, beyond microbial identification, is given as general info from published sources and is not an extension of liability to Natural Link MOLD LABNatural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associatedwith the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 227 Tape Sample Analytical Laboratory Report Fungal Microscopic ExamNatural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. T-8. South Cubicle Area / East Fabric Window Sill - 2nd Floor; Tape Sample; 2-16-2023 [S216205AB27331] FCG EnvironmentalAccount Name: Blake ForbessSubmitter: City of Moorpark - 37Project PO:02-17-2023Date Received: 56222Control ID #: 02-17-2023Date Reported: Sample Identification: Summary of Findings s Dominant fungi detected on sample: Cladosporium and Chaetomium. Macroscopic Observations: s Black colored material present on sample. s Density: Medium. Microscopic Observations: s See Summary Table (56222-R02A). s s Nearly confluent growth; spores, conidiophores and hyphae detected. s Fungal growth detected: Chaetomium. s Extensive growth; spores, ascocarps and hyphae detected. s Fungal growth detected: Alternaria. s Sparse/minimal growth; spores detected. s Many spores detected possibly indicative of remnants of growth or growth in adjacent areas. s Fungal growth detected: Thielaviopsis. s Sparse/minimal growth; spores detected. s Many spores detected possibly indicative of remnants of growth or growth in adjacent areas. s Few miscellaneous spores (including Aureobasidium) detected, possibly indicative of typical settled air flora or growth in adjacent areas. s Fiberglass particles detected. Fungal growth detected: Cladosporium. Report #:56222-R02 Analysis Date:02-17-2023 RB27331 3 Laboratory Results authorized by Laura Parsons, Mold Lab Technical Director Natural Link MOLD LAB reports sample results as a record of the microbes identified by our analytical staff. Any guidance given with regards to sampling methods, interpretation of results, remediation,health effects, or other information given to the client, beyond microbial identification, is given as general info from published sources and is not an extension of liability to Natural Link MOLD LABNatural Link MOLD LAB establishes responsibility over analysis completed in the laboratory but cannot establish responsibility for activities completed in the field by the client, other personnel associatedwith the samples submitted, or other activities beyond the laboratory. All reports are confidential and are not to be reproduced, except in whole, without the permission of Natural Link MOLD LAB. Natural Link MOLD LAB, 1320 Freeport Blvd., #104, Sparks, NV 89431 phone: (775) 359-3377 228 Natural Link MOLD LAB A subsidiary of Asbestos TEM Laboratories, Inc. TB15972 56222 FCG Environmental City of Moorpark - 37 02-17-2023 T-6. North Cubicle Area, Top of T- Bar Ceiling Tile - 2nd Floor T-7. North Cubicle Area / North Concrete Wall Above Drop - 2nd Floor T-8. South Cubicle Area / East Fabric Window Sill - 2nd Floor Tape Sample Tape Sample Tape Sample Page 1 of 1Report # 56222-R02A Control # Account Name Project/P.O.:Date Reported Summary Table Level 5 Level 4 Level 3 Level 2 Level 1 Level 0 Comments Nearly confluent growth (81-100% cover) Extensive growth (61-80% cover) Moderate amounts of growth (41-60% cover) Limited growth (21-40% cover) Sparse/minimal growth (1-20% cover) Miscellaneous Spores (<1% cover) Extent of Biological Activity Fungal Microscopic Examination Penicillium Cladosporium Alternaria Cladosporium Stachybotrys Aspergillus Cladosporium Chaetomium Alternaria Thielaviopsis Aureobasidium [b] Natural Link Mold Lab, 1320 Freeport Blvd., #104, Sparks, NV 89431 229 Chain-of-Custody Form Account name t c~ e/llt/~rQV..\JV\cvJ.o.-1 Sampling date L -b - Project I P .0. -37 31.-J Sc.,l .. v\~J"' 11\r. Sample ident i fication, descript ion . and/or location A-I Lobb,1/Ho..\\w,.v -1i~ Floor A-2.. No,~1L r ,iJ,iJ~t Aa-..r..-,,.1 '..,, A-~ <-..,.,fl,.(,1 1 . -5..,,s,._-'t' v A-1/ /Jorll CtLb;Je., ,4;e--?,"',.1 Floor A-f 50..-tt... ~ ~ -'-~ .I Avb ~{<-n9~"""" -t ~ L, ns-1 tJCJ..,+ s,-;1. --s E of /'Side... . -f'-t Lo/Jov pltW.,~c.r Bo:ic: _ wJ 6~-1$+ Fk,~ i::{i~ t,./P-11 $' (-z. N£ of~~,e..-A}etN"Jl£ -rd./;,,... a~~~ 1 . Fico- f, 3 So'-"f.. ~~ ~p,-u..--fowv s,v-fl.. wd.ll i-' I Sample Analysis* vol ume Fl',1E NFME FC BC EC l~L )t 'I._ y )( )( ,v X X k' t )l (775) 359-3377 (7 75) 356-MOLD info@asbes1os1emlabs.com Altema1ive I add itional T .A.T. anal vs is rcnuested: RU'-l-f STD - X )( 'Y.. x ~ X )( llfu...,._ Mel~ -Utt Alo-"' . F~s k 'i U' ,w ~ ) FM£. F1111gal Micrmmpil" Emmi mu ion --NFME . .V,111-F11n1tu l Min osmpic Emm --FC.Frmg al C11/rn re -· BC.&wceria/ Ci1/111 re -EC. E H1 l i (rn/ifr,r,m) ID Submjller'<; Signamre Submjuer's Signalure Dale ~I Receiver•~ Time .3 : I a Signature Da te _/_/_ Receiv e r's lime am pm Signature Submit all samples ro Nat ural Link MO L D L A B . 1320 Freeporr 811-d 11 104. Sparks NV 89431 Dale ~/ _J..1_1 ~ Time , ,: '1' Dale _/ __ lime am pm NLMLab COC (r 7.0) © 2022 230 / .I I Chain-of-Custody Form .l\=um name f { (;_, & v l~ro v---~1~ l ,?j's • \ I' . i -( (A.. v,<_; hr . Sample identification, description. and/or location Sample volu me FME "'f-'( l?f'Ukroo ...... z,.o df T-8-u;(;,~ l,l~-1s' Floa -)I f -~ Mo{) Clo~/,~~ AJ..-1.L ,:;"'-,l -~ 4' y T-t. ,Uiw~ r ,,b:J~ A1e,o.., -r.~ of. r-s-u.-li,,ji/,,-2"'" l 1=-/ "(h .-y f-7 t I-t 7 " ~ /11,.,,/L ~,J~IAJ.,J/ ,._J...~l,.,.,.-J. ..., f -g ✓~ .. ..J(,.. 't ~ I ~J. C..f,,tc.. w-."'lov. 1;// :.... .J, •v .k' lf-9 ~w ~v ,11 ,A-,"'k J., i, J.. -'., L; ~ 1-/() ~~ f O(l',V dtk'<.,!DN~1, foof J)t,: .... a'-k -,.,.. . y -r-11 J?v..,/.k llootk/wJf ,~Je, tuLU ~~ ~.t -1 v • I/ y J ~-~ -"· al ti ,, .... Natu.ralli11 kMOLD LAB p;-; I . . ' . I ~ I ~- Analysis* NFME FC BC EC ~ ft. I Iii! I ~ l'.a_ (775) 359-3377 (775 ) 356-MOLD i nfo @as bestostemlabs.com Al lemative/ a d ditional T.A.T. an al vs is reouested : RUSH sro P(~ HolfL-C,ci....l\ _A f,4u .,.-' --:> )( X y y )( V 'y ,v ,v lk l Microscopic £wmination -NFME. Non-Fungal Micrnscopic Exam -· FC. Fun gal Cu/rure --BC. Bacterial Culture -EC. E.coli (colifo r ms) ID Submitter' Sign ature Submiuer's Signature Date lime 0-,lle Time ignacure Receiver's am pm Signature Date Z-/ _J:!..__/ ~ Time 10 :'"'-X.) 'Date -. I _I _ Time am pm ·~!-----------------------■ 5~222-- Page:k_of L-Submit all samples to Natural Link MOW LAB, /320 Freeport Blvd #104, Sparks NV 89431 NLMLab CDC (v 7.0) © 2022 231 .., ... ~ rn I I 1 1_1_11 L w (..c,wU v»- Level 1. ENLARGED RESTROOM PRECISION DEMO PLAN iw.,.,.. i -:. \.,JS" IAJ,>J l ~ -t,JS Floo, U pl-.-l-v-~ 0 w ~ 'T-B-Ce\h·') 1'il-c...1> • -I/fr -/o :. A,us of F:.M 4b~ l6°fo JJt. w!M., M~'\,..,,./,, r.;. l " '--~J l . . . : :j'. : C • . . . {:' . . ' . ' . ~ : . . " : : :1-s+ =I = 0 ---~~!0lllnC-U:1':ll.'U.f toUtOo\•Dm.lU,,Uo; Q)IIUVl!...nE L.WfMTt.•~,...,,.,__ffllllfl .... e l>IC"'ll._,.0.ffOIII =:~~..:'1?~f,=:_'3~~'=~~0:,. •-li....itt-, ®~~-:rn::~~--=rJ..~:f:;r~;W"-="J\C:. CbrrC.IOft~l'"1N~ll. @=~=~':.!~~~-=~~:==-~""' ®~=---=:.lS•WJi«,;i>UtCU.Tliit<•MNCt,'4( @«..:i..'llitJOUT-U~O @1,1.tuRD011•SNO:lil:I IQA!lAISf~N~'KJll.(IOoll'l(T. ®~"',V,C:ftwl)IOo,ait~ @~~- ® =~:i~-=.::=~~fOO~o,w...4 @~-.i.wov. @ilb-t.!IO«-,.uorc:,11-L ® ~tO.,.,_Q;_~~M~Mel-1'1-~111". @ llfW«OUU~11f/MDI UHltJ!fl'4l.l ... ~, ~r.,~1a.itoo>nrnao•1oG. PLAN DEMO KEYNOTES e 5ri.~:J.:t=...~~~-='~"~~co ® .C-a'-~1,,0!'lll~~flO\IIU.1 US~fl,c,:nic,,,c_ ®""-Cll#'-""'TnlTUIIIU 1-tt"""°f\"'ffl( ... @«---~f!)f.,..Ulil«'C,t(-('.flll'II.C ... t @11t:~tri'1w,l;to.N'"'"'t,~,f~"'~Wlut. @(At.1.•l:C(UIGOflt-l'IJlll<>IXW'fOl't.\('J-0,~ RCP DEMO NOTES ..,_ -l•.-,.~......,.. N<MC1U..c<~nuowD1WOUrDO ~.,_.~-flll~J.>~ ... M;QQIIA1,-01-~--tl0ill11-~IWl~=,crC.:~::r:-:=:~t..OOll..,J!kUDOOI .. fl-"9t'D"l'IM!f/le(>IOU!il>f0....c\.lWIKP:f•10IIUTUAMEO!'°"' ~lliC~lCfJu»IO,,lpl)(ltUQ. c,,1tl0000wt!l"1ltl>l[.j,J-\S CO,.~llllS,040TlolJJIICSUtM. ~l( .. T$611(~1,1fOWHIGIICCIIUntc»'OCWJI.IICW IN:Oill~l ,...,..IC.AlPl•-flof~Ntl:,"'-"'IO"':left~A .,,OO'it.ll-l"'""40IQl,llil(O .... ~Ctu,,D""-"G:OlllfUJritO, l'"'-"°"''Ul!-lbl1,a1'Jlllhrottt.1W'1""-1t".I.&_.._, UCIQ;: ...... t¢,,,.f,r," ... ,.._4,, 6-U-~CCUll)fll..fNIOllfl'O ~IMIQl._,lt(IOl.J°'.a«lr.li- 'llll-tcl.llll-lO.Olll'IC"1'rQIIJtW:,,-,,U. ~_,,.-'1:~,0\'•MO «&IOGl ll'"--C(),..01,.UW.~tcfXWl"fl;ll-~l'llt.-- Ol~CJ•Oll'l~ I :.:: i a:: ct ...J I n. a:: ...J 0 ct i 0 J: ::i;; >-i u. I- 0 u ~ >-~ t-ll u z a ■ AsMCllll!G A10.1 LEVEL 1 DEMOLITION FLOOR AND REFLECTED CEILING PLANS ARCHITECTS ..... ._...., ,.. ..... , ..... ··•=~ ., ~ ....... , '•'"'>' 1--------------------------------------------------------l-e-ve_l _1 -. R_C_P_D_e_m-ol-il_io..,nr---.--,--1+----0-EM_O_L_IT_IO_N_G_E_NE_RA_L_N_O_T_ES-----I ,.'..,. ~· ....... ,_,,,: ,...,.,r ~J4-'•r- 232 :: ., I 1 1 1 1 LLI I I I Level 2. ENLARGED RESTROO::M----~ S PRECISION OE .. OUTI ON PLAN ...... ,.... 3 . ?® or~ t..i.C u.lil o_,-~7 ., e-...-c l efJ) S"6i...-f~ ,.J!i ill ~ j ~ ~/ _.,/,==~-. @ ~-" f--1 . l.@) l e vC?l 2 -Demolition FLOOR PLAN OEMO KEYNOTES RCP DEMO NOTES DEMOLITION Gt;NER.AL NOTES ~ 0: <t D. ...J 0: ...J 0 <t 0 :r :i: >- u.. ~ 0 u >-~ ~ u w z RE\IC51Dhllll ■ A10.2 LEVEL 2 DEMOLITION FLOOR AND REFLECTED CEILING PLANS 233 Alan W. Forbess, Certifications (2023-2024) Sta te of Ca liforn ia Division of O ccupatio na l Safet y and Hea lth ~-=- -)~ 111 lq, II I( Public Health Certified Asbestos Consultant Alan Wayne Forbess Name Certificati o n No . 94-1549- Expires o n _ __.o .... 1.6...11 .... 2....,12&,::4L--__ This certification was issued by the Division of Occupational Safety and Health as authOrlzed by Sections 7180 et seq . of the Business and Profess ions Code . STATE OF CALIFORNIA DEPARTMENT OF PUBLIC HEALTH LEAD-RELATED CONSTRUCTION CERTIFICATE INDIVIDUAL: CERTIFICATE TYPE: LC'ad lnspeccor/A.ssc!>\C>r l.rJ<I Projrc1 Moni1or NUMBER: LRC 00000505 I RC 00000504 EXPIRATION DATE: G/20/2023 h/llWl0l:1 D l~l+.11 111<-r T his documC'm alonr should nol br relied u 1X1n 10 t'onnnn tf'llint,Hi o n ,1n1u, Co mpart' tht' 111d1 vldu.11', llho10 ,md namr to aoo1hr1 vaHd form or govl'rnrm:nt i '>.\Ul'd pho to ldcn1iOc.11ion V('rify the indivldu.11 · ~ C<'rt l 0ca11on srnlus by ,(•ardnng for I .ea d ... Rc:l:ucd Construction Profr\sin nal, ,II WWW ( rlph .qt 1mvlprn41,1 111-.;'c lpph or c.i lling (800) 597.1 F.AD OARD CE RTIFIE D #0804051 Exp. 6/30/2022 ~ Micro 234 FCG Staff Certifications – William A. Miller State of California Division of Occupational Safety and Health Certified Site Surveillance Technician William A Miller Na me Certification No . 07-4160 Expires on 03/22/23 This certification was issued by the Di vision of Occupati onal Safety and Health as authorized by Sections 7180 et seq. of the Business and Professions Code . I t-. " ,,, ....... -,,, Public Hea lth ST AT£ 01-·C A LI FOR.N I A DlPA l{'('M ENT O F l'UULIC IIEA LT H LEAD-RELATED CONSTRUCTION CERTIFICATE l '\'Dl\'IDUA L: \\-illia m \tille r C ERTI F ICATE T YPE : Lead l ru;pcc1or 1Asscuor Lead ProJcct Monitor NU MBER: LRC-00000721 LRC-00000720 EX PlllATION DATE: 6/13'2013 61 13·2023 D1scl a1mcr· I h,~ document alone i.hould nOI be relied upon to confinn ccrt1ficnt1on Matu:. Com pare the md1,1d ua1·s photo and name lo 1m01 hcr ,al1d fom1 of go\-cmmcnt 1"3ucd photo 1dcn11fir.:at mn Vcnfy the mdn1du11's ccr11ficauon !.l.tlui. by scarch mg for Lc-ad-Rchucd ('oru.truction Prok~1onals 111 v.ww cdph ca g<1, programs.'dppb or calling (800) 597-L£AO ',10Sll5&2.0125rnl-001 Willinm Miller 000-00-720tt h.,.\aamJcJ111.J-J~t•11I) ,m-lc-tcJdk ,~an Sampl ing and E,aluau r.g Airborne A,be\10, Du...a JOSH 582 Eq11il'alent \olllill,I.LI) frl,r,1i1rv.?<1,Jw~ 235 Blake Forbess Certifications 2023 State of California Division of Occupational Saf ety and Hea lt h Certified Site Surveillance Technician Bia ~ R Forbes,s me J.:.,.., Certi fi cation No. 18•6328 Expires on 11 ,'15 ,'23 This certilication was issued by the Division of Occupational Safety and Health as authori zed by Seclions 71 BO et seq. of the Business and Professions Code . STATE OF C.\1.1 1 OUN L\ ~ c~lifornfo Otl'!lflflll'!H (I : JJU' ARTMEr--T OF Pl,IUJC Hl:ALTI T PublicHea lth LEAD-RELATED CONSTRUCTION CERTIFICATE )'.llDTVfl>l.f,\L: CERTIFIC,\TI-: TYl'E: ~_,, eA 1.e.tt.S.i.ll~n .. .-,,,.. .. ,~ ..... \?JI EXPIRA.'TION O,Yt li; lllak" Fur Iii'~ l \b<hl.m(1: T hl\dr~m'lllilll ~l.')~$:l'Ju;d:I n:,t b ett-:lc..1 -.p~,) !(l 1,.t.mli,1t1•.\'i:dHotton .'1.~lu\, Cr.,,,,,;,,,, II •· ;..,i,,·i.,J,...j)·11c pWw~ml m 1m: 10 .:.nl'lllll'r •:;iU~ (Gm .;,J 1,:,vrrnm:-nt 't<~.00 ptoto ill~ulilie~lwn. Vmfy 1l-.."l lncJ.,·l h.1Al'H1et tilkstiu n 1o1:1h1:: ~·~tt((Wng:t:i; lttd·Rt!atr.tl Umvn1::1l(ln Prd~.s,<;ihO!'\ls ru. V,V."'!.rtlpt ,.a ~, ..... HOS:-"'<l1m:~t!l11b<II' 1:.tlliu;~ ,.xm ~97-tEAD 236 Dana Stephens Certifications - 2023 d~ ~Californi1 Dcput mrn, of Public Health STATE OF CALIFORNIA DEPARTMENT OF PUBLIC H EALTii LEAD-RELATED CONSTR UCTION CERTIFICATE INDIVIDUAL: CERTIFICATE TYP E: NUMilER: EXPIRATION DAT E: Lead S.1mpllng Technician LRC-0000 1070 7/19/2023 Dan a Stephens Disclaimer: This doc umcnl alone should no1 be relied upon 10 confinn certiOcaUon s lal us. Com pare Iii, lrMllvldual's photo and name 10 ano1hcr valid fo nn of govcmm en1 Issued pho10 iden1ifica1ion. Verify the ind ividual's cer1m,•a1ion s1a1us by searching for Lead-Related Construc tion Professionals al \\Ww.cdoh.ca.gov/progr.uns/cl pph OI' ca lllng (800) 597-LEAD ACC ANA M. STEPHEN BOARD CERTIFIED #1102018 Exp. 3/31/2021 Mier 237 Standard Mold Remediation Protocol General Information: The enclosed protocol is recommended for the proper remediation of microbial growth or moisture damaged building materials as part of a site renovation or restoration project. These procedures comply with current industry standards, including, but not limited to the following:  IICRC S520 - Standard and Reference Guide for Professional Mold Remediation  EPA - Mold Remediation in Schools and Commercial Buildings  ACGIH – Bioaerosols: Assessment and Control Purpose/Intent: The standard protocol is provided as a guidance document for the contractor which will allow him to properly contain and remediate areas of identified mold growth using the procedures enclosed. The standard protocol conforms to procedures outlined in a variety of established resources on mold contamination and remediation. Contractors should adhere to these guidelines to facilitate the remediation of microbial contamination. The procedures and guidelines provided may be modified as necessary to preserve the health and safety of workers and occupants or to increase the effectiveness of the remediation. Recommended Procedures for Mold Remediation 1.0 Pre-Abatement Measures 1.1 Source Identification: In all mold remediation projects, identification of the source of water intrusion is the first and most important step. The success of the project will rely on the identification of the source of water intrusion to prevent further growth and damage from on-going leaks or moisture intrusion. Repairs should be conducted simultaneously or prior to the anticipated mold remediation project. This protocol anticipates that mold remediation tasks will be conducted in the areas of concern which will allow for the proper plumbing repairs or other corrective measures to ensure the problem is remedied. This will require the following anticipated steps:  Contractor will visually inspect the area of proposed work and look for signs of visible mold growth, staining, water damage, or similar evidence of microbial contamination.  Based on the visual observations, contractor shall place the area of concern within properly established negative air containment per Section 1.3 below. This includes identification of mold on the finished surfaces or mold that is discovered in the interior wall cavities during initial removal of building materials. 1.2 Communication: Proper communication between the involved parties is essential in successful remediation of the identified problem areas. This involves notification and communication between the various contractors, umm FCG Environmental 1009 Mercer Ave. Ojai , CA 93023 Environmental Consulting Services Asbestos• Mold• Lead• Property Assessment Te l : 805 .646.1995 I Fax: 805 .669 .3538 lnfo @fcgenv iro .com I www.fcgenviro .com 238 FCG Environmental Standard Mold Remediation Protocol project managers, environmental consultant and property owners/occupants. The roles and responsibilities of the various parties are described below: Contractor/Remediation Supervisor: All mold remediation work will be conducted by a qualified mold remediation company. The contractor shall employ a Remediation Supervisor with appropriate training and certification to oversee all field work. The Supervisor must be located on site during all field work where mold impacted materials are being removed or disturbed. It is the on-site supervisor’s responsibility to ensure that all work is conducted per the enclosed protocol and current industry standards for mold remediation. Project Manager: Most large projects will require a Project Manager responsible for scheduling renovation work and coordination with contractors and sub-contractors, and correspondence with building occupants and owners regarding all facets of scheduling, planning and supervising the overall project progress. Environmental Consultant: FCG Environmental or similar 3rd party consultant shall provide consulting and testing services as needed, including development of the initial scope of work, monitoring the remediation process and providing clearance inspections and air sampling of all impacted areas following remediation work. FCG should be consulted if unusual conditions or extensive mold growth is encountered which requires additional guidance or testing services. FCG is available as needed for all questions or concerns regarding mold contamination issues, occupant exposure or similar matters. Owners/Occupants: It is important that the property owner and any tenants or occupants cooperate with on-site personnel and allow access to the impacted areas for remediation. These individuals must be notified prior to site inspections or field work in accordance with any lease agreements or CC&R requirements, typically being given a minimum of 24-hours notice. Once work has begun and the work area has been properly contained, it the responsibility of the occupants to stay out of the work area and not disturb unplug any fans or filtration equipment, and keep all children, pets and others away from the work area. 1.3 Work Area Containment: The purpose of containment is to inhibit the release of mold spores and other microbial contaminants into surrounding areas. Each identified work area (bathroom, kitchen, laundry room, etc.) shall be established using the following procedures:  Containment shall be used for all projects where mold remediation tasks are anticipated. Standard Mold Remediation Protocol - 2013.doc 2 239 FCG Environmental Standard Mold Remediation Protocol  Prior to setting containment, all non-structural or personal belongings shall be moved from the work area by either bagging or boxing and coordinating storage with the occupants. See Section 6.3 Contents Cleaning for further information regarding optional cleaning of personal belongings or non-structural items.  To enclose the work area, remediation contractors shall attach 6 mil polyethylene sheeting from floor to ceiling across openings using with duct tape, furring strips or other suitable means, covering the perimeter of the work area. Contractor should attempt to protect finished surfaces by using masking tape of similar means prior to adhering duct tape or other material which may damage paint finishes, wood surfaces or other materials when removed.  Polyethylene sheeting may be attached to a PVC or wooden frame to establish temporary walls and contain larger areas.  All entry points should consist of a critical barrier with plastic sheeting covering both sides of a Z-flap or T-flap.  Polyethylene sheeting should be used to cover all critical openings, including doors, windows, air vents, and risers.  Remediation workers should maintain containment areas under negative pressure by use of an appropriate sized, negative air machine equipped with HEPA filtration. The negative air exhaust should be ducted outside the containment and outside the structure whenever possible.  A single-stage decontamination unit should be constructed for the entry and exit points. The decon unit should be large enough to contain waste bags and to allow workers to don or remove PPE.  Remediation contractors shall maintain containment areas under negative pressure throughout the duration of all building material removal and disturbance activities, including final cleaning and wipe down.  Contractors shall use appropriate decontamination methods upon exiting the contained work area to avoid cross contamination of areas outside the containment. This includes removal of disposal suits, gloves and equipment prior to leaving the containment.  Additional HEPA-filtered negative air machines may be used within the containment areas to assist with air filtration as necessary.  Whenever possible, containment should be constructed in an unoccupied or common area, such as the hallway or common wall behind the area of concern to avoid unnecessary damage to interior units and surfaces. 1.4 Tenant Move Out (optional): In situations where containment is extensive and planned operations will prevent access to basic kitchen and bathroom use, or where mold concentrations may pose a health threat to the occupants, it is recommended that the tenants be moved out of the residence temporarily until clearance is granted. This makes the contractor’s job easier and protects the tenants from possible exposure to elevated mold spore counts. In situations where minimal work is planned and indoor air quality is within background levels, the tenants may remain in the residence. Standard Mold Remediation Protocol - 2013.doc 3 240 FCG Environmental Standard Mold Remediation Protocol 2.0 Removal and Cleaning Procedures: The following procedures are recommended for the removal and cleaning of mold-impacted building materials and surfaces. All work shall conform to current industry standards for remediation, including the IICRC S520 and EPA guidance documents.  Removal or disturbance of building materials shall not be performed until negative air containment is established and all non-structural items have been removed from the work area.  The contained areas shall be marked with appropriate signage to prevent untrained workers or residents from entering the work area.  Remove all porous, stained mold-impacted or damaged building materials from the area of concern. Porous building materials include drywall, insulation, carpeting or other soft, porous materials that cannot be cleaned using standard methods. It is recommended that removal of impacted building materials continue to a distance of at least 1-2’ beyond the area of visible damage or staining to ensure that all impacted areas are exposed.  Inspect all backing wallboard or exposed building materials on the opposite side of destructive openings for signs of mold contamination. If significant contamination is noted, the containment may need to be expanded to allow for continued removal of impacted, porous materials.  If visible contamination extends into a neighboring room or unit, or extends to inaccessible areas (i.e., behind bathtubs, cabinets, etc.), the Project Manager shall be notified and arrangements for additional remediation provided. Contractor shall not remove fixtures or cabinetry outside the scope of work without prior approval.  Clean all exposed surfaces and wood framing through the use of abrasive cleaning methods, including the use of sanding, wire brushing, scrubbing, or similar methods to remove surface staining or visible growth sites. Abrasive methods shall be performed using HEPA vacuums and other dust control methods.  All removal activities, demolition, sanding or similar actions which may cause a significant release of dust and spores must be performed using appropriate controls to minimize airborne contamination.  Due to the potential for bacterial contamination from sewer piping leaks, it is recommended that the contractor use of an appropriate cleaning agent, such diluted bleach, surfactant or detergent solutions in order to disinfect the affected areas.  HEPA vacuum and damp wipe all surfaces within containment upon conclusion of abrasive cleaning activities.  All surfaces and materials must be dried to within normal, acceptable range (<15% by standard wood scale) and shall be checked by moisture meter prior to clearance.  Encapsulation is not recommended and should be conducted only with prior approval of the involved parties after a visual inspection of the remediated area has been performed to inspect the remediated areas.  Dispose of all removed building materials and waste generated by bagging and transporting out of the containment to an appropriate disposal bin. Standard Mold Remediation Protocol - 2013.doc 4 241 FCG Environmental Standard Mold Remediation Protocol  Maintain HEPA filtration on negative air mode until all cleaning and disturbance work is completed. It is recommended that the contractor disconnect the exhaust ducting and switch to air scrub or recirculation mode after cleaning is complete to remove airborne mold spores down to acceptable background levels.  Ensure that all exposed building materials are clean and dry at the conclusion of field work, with no visible debris or excessive dust in the containment at the time of final inspection.  Clearance by a 3rd party, independent consultant or hygienist is recommended to document the success of the remediation project, and is discussed in Section 5.0 below.  Encapsulation shall be considered only where surface abrasion and normal cleaning processes cannot return the material to a mold-free condition, and removal is not appropriate. 3.0 Contractor Requirements 3.1 Training and Licensing: The remediation contractor shall be licensed in the State of California to perform the required tasks. All workers shall be properly trained with experience in mold remediation projects. All workers required to wear respiratory protection shall be properly fit tested and medically approved through pulmonary function testing by a licensed physician. 3.2 Insurance: The contractor shall maintain insurance coverage per the requirements of the owner or client, which may include, but is not limited to: general liability, pollution liability, workers compensation, automobile and professional liability (errors and omissions). All insurance coverage shall comply with the coverage amounts and contract requirements requested by the client. 3.3 Site Supervision/Monitoring: The contractor shall ensure that a qualified supervisor is present during all site work where disturbance activity is on- going. The supervisor shall be responsible for ensuring a safe working environment, overseeing all removal and abatement tasks, ensuring negative air conditions are maintained within containment, controlling access to the work area, and similar supervisory tasks. The supervisor shall be available to correspond with representatives, inspectors and technical personnel as needed to provide information regarding project progress, problems, or similar concerns. The supervisor must be experienced in all phases of mold remediation. If problems arise which may impact the successful completion of the project, it is the responsibility of the supervisor to contact the appropriate parties and stop work as necessary. 3.4 Site Security: Contractor shall maintain each work area in a secure and safe manner, preventing exposure to untrained workers and residents. All equipment, tools and materials shall be secured at the end of each work shift, with waste materials properly contained and disposed or stored within a secured or locked area. General safety requirements, including OSHA compliance is discussed below. Standard Mold Remediation Protocol - 2013.doc 5 242 FCG Environmental Standard Mold Remediation Protocol 4.0 Health and Safety Requirements: 4.1 Health and Safety Plan: The selected contractor must maintain an appropriate Health and Safety Plan (H&S Plan) for site work involving the potential disturbance of mold contaminated materials. All contractor personnel must be properly trained and familiar with the H&S Plan elements, which should include information on safe work practices, the potential health effects of mold, personal protective equipment (PPE) requirements, medical surveillance and monitoring requirements, and other important issues related to mold remediation projects. The contractor should also maintain a written respiratory protection program as personnel will be wearing respirators during all disturbance work. If the contractor does not have an adequate H&S Plan and/or respiratory protection program, these items should be developed prior to starting the project. It is the responsibility of the contractor to provide these documents. 4.2 Personal Protective Equipment (PPE): This project will include the proper use of personal protective equipment (PPE), including, but not limited to, air purifying respirators, gloves and protective suits. Full-face respirators are preferred for those workers performing actual disturbance work, while half-mask respirators may be appropriate for limited tasks where disturbance is not significant. P-100 HEPA filters are recommended, with organic vapor cartridges added where significant odors or possible volatile organic compounds (VOCs) are anticipated. 4.3 OSHA Requirements: All work practices shall be conducted in accordance with OSHA standards and other applicable regulations, including Title 8 of the California Code of Regulations and Title 29 of the Code of Federal Regulations. 5.0 Monitoring and Post-Remediation Sampling Post-remediation sampling will be performed by FCG personnel to determine the success or failure of additional remediation work. Sampling will be conducted following the final cleaning stages to confirm the remediation of surface growth and airborne mold spores to normal, background levels. This will be completed using a combination of a thorough visual inspection combined with air and/or surface sampling to confirm successful remediation. Criteria for clearance will include the following elements:  All impacted porous materials have been removed and surfaces have been properly cleaned, with no visible evidence of mold growth, staining, excessive dust or debris found within the contained work areas.  Building materials are within normal, dry range (<15%) when checked using standard moisture meter equipment.  The source of water intrusion has been identified and repaired, with no leaks or standing water found at the time of clearance inspection. Standard Mold Remediation Protocol - 2013.doc 6 243 FCG Environmental Standard Mold Remediation Protocol  Indoor air and surface sampling results are consistent with normal, background conditions. Air samples from inside the contained work areas will be compared to outdoor air samples, and deemed cleared if the total spore counts and species distribution are within acceptable, comparable range. If final sampling indicates spore concentrations are significantly above ambient levels, additional assessment, remediation and air scrubbing will be performed until ambient levels are achieved. Following successful sampling, reconstruction work can begin. 6.0 Supplemental Recommendations & Protocols (Optional) 6.1 HVAC System: It is recommended that regular cleaning of individual HVAC systems be conducted as part of normal site maintenance. Cleaning should include the forced air unit, supply and return plenums, and air ducting systems. The objective is to remove any settled spores and dust within the system. If the duct system consists of flex ducting, removal and replacement may be considered as thorough cleaning of flex ducting can be difficult. 6.2 Asbestos and Lead Paint Testing: For structures built before 1980, sampling or assessment is recommended to identify the presence of suspect asbestos containing materials (ACM) or lead-based paint compounds. The contractor should be aware of the requirements for proper handling and disposal of asbestos and lead compounds, and if necessary, a qualified subcontractor should be hired to perform abatement of asbestos and/or lead as necessary. If a survey has not been performed, suspect materials must be treated as asbestos or lead containing. 6.3 Contents Cleaning: In the event that personal contents or belongings have been impacted by mold growth or excessive spore concentrations, the following protocols are recommended for the various items as noted below: Porous Materials/Soft Goods: Porous, soft items such as clothing, upholstered furniture, area rugs or similar items containing visible mold growth can be very difficult to clean and will most often be discarded and replaced. Porous items which have been exposed to significantly elevated spore counts may require HEPA cleaning to return the items to a normal, background condition. Random testing may be required to determine the extent of contamination. The following is a general protocol for the typical items encountered in a mold remediation project:  Cloth materials (washable): Bag and transport all items made of soft washable fabric off site for laundering. This includes bedding, pillows, clothing and similar small items. These items should be laundered using hot water and a standard laundry detergent. Where warranted, specialty items should be sent for professional dry cleaning or steam cleaning and vacuumed with HEPA-filtration equipment. Most delicate clothing items may be dry cleaned.  Larger Porous Items: Upholstered furniture, area rugs, draperies or similar items may be HEPA vacuumed to remove settled spores Standard Mold Remediation Protocol - 2013.doc 7 244 FCG Environmental Standard Mold Remediation Protocol and return the items to normal conditions. HEPA vacuuming, followed by steam cleaning, and then followed by additional HEPA vacuuming is also an acceptable method for selected items. Non-porous materials (plastic, metal, glass, finished wood, etc.: Vacuum non-porous materials with HEPA filtration equipment then wipe down with a clean damp cloth using a mild soap or surfactant. After cleaning, non- porous materials should be bagged or boxed, transported off site and stored in a clean environment. Computer, Stereo and Electronic Equipment: Vacuum these items using HEPA filtration equipment; wipe down with damp cloth; box or bag and seal the items for transportation and storage. It may be necessary to use a commercial can of compressed air (Duster or similar product) to blow out dust from cases and housings. This should be done inside of a contained area using HEPA filtration to remove the excess dust and spores from the air. Books, Documents, Paper Products: HEPA vacuum and fan simultaneously any paper products such as books to remove potential loose spores. This work should also be conducted in a negative pressure chamber with HEPA filtration. These items should be boxed or bagged to prevent microbial reproduction. Dispose of any paper materials showing water damage or visible mold contamination. If necessary, responsible parties may send valuable papers offsite for reproduction or to a qualified professional cleaning service for restoration. Standard Mold Remediation Protocol - 2013.doc 8 245 FCG Environmental Standard Mold Remediation Protocol Limitations Statement The information provided within this document is intended to comply with current standard practices accepted within the industry. The recommendations and procedures shall be used only by the involved parties for the project described in this report. Any use or reliance of this documentation by a third party without the explicit authorization of Forbess Consulting Group Inc. (FCG Environmental) or the designated client shall be strictly at the risk of the third party. Currently there are no federal or state standards for the assessment or remediation of microbiological contaminated sites. No acceptable thresholds or health standards have been implemented for mold exposure. Responses will differ greatly between individuals depending on a number of factors, such as the sensitivity of the individual to a particular biological pollutant and their pre-existing health conditions. Forbess Consulting Group, Inc. (FCG Environmental) cannot and will not provide medical advice or opinions as to the associated health problems encountered from exposure to biological pollutants. If individuals are experiencing symptoms they should consult their personal physician or an appropriate medical care provider. If you have any questions or concerns regarding the information provided, please do not hesitate to call FCG at 805.646.1995 _________________________ Prepared by: Alan Forbess, Principal Certified Microbial Consultant No. 0804051 (IAQA, ACAC) Standard Mold Remediation Protocol - 2013.doc 9 246 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 03 10 00 - 1 CONCRETE FORMWORK SECTION 03 10 00 CONCRETE FORMWORK PART 1 - GENERAL 1.1 SECTION INCLUDES A. Formwork for cast-in-place concrete with, bracing, and anchorage. B. Openings for other affected work. C. Form accessories. D. Stripping forms. 1.2 REFERENCES A. 2019 CBC – California Building Code, (CCR) California Code of Regulations, Title 24, Part 2, Chapter 19. B. ACI 301 - Specifications for Structural Concrete for Buildings. C. PS-1 - Construction and Industrial Plywood. 1.3 SYSTEM DESCRIPTION A. Design, engineer, and construct formwork, shoring, and bracing to meet design and code requirements, so that resultant concrete conforms to required shapes, lines, and dimensions. 1.4 QUALITY ASSURANCE A. Construct and erect concrete formwork in accordance with ACI 301. 1.5 REGULATORY REQUIREMENTS A. Conform to CBC - California Building Code, (CCR) California Code of Regulations, Title 24, Part 2. PART 2 - PRODUCTS 2.1 FORM MATERIALS A. Plywood: PS-1, BB Plyform grade, Class I, Exterior classification. B. Lumber: Douglas Fir species; construction grade; with grade stamp clearly visible. 2.2 FORMWORK ACCESSORIES A. Form Ties: Snap-off metal of adjustable length; cone type; 1 inch break back dimension; free of defects that will leave holes no larger than one inch diameter in concrete surface. 247 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 03 10 00 - 2 CONCRETE FORMWORK B. Form Release Agent: Colorless material which will not stain concrete, absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete. C. Fillets for Chamfered Corners: Wood strips type; 3/4 x 3/4 inch size; maximum possible lengths. D. Dovetail Anchor Slots: Minimum 22 gage galvanized steel; foam filled; release tape sealed slots; bent tab anchors; securable to concrete formwork; manufactured by Heckmann Building Products Co., www.heckmannbuildingprods.com. E. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Sized as required; of strength and character to maintain formwork in place while placing concrete. PART 3 - EXECUTION 3.1 INSPECTION A. Verify lines, levels, and measurements before proceeding with formwork. 3.2 PREPARATION A. Minimize form joints. Symmetrically align joints and make watertight to prevent leakage of mortar. B. Arrange and assemble formwork to permit stripping, so that concrete is not damaged during its removal. C. Arrange forms to allow stripping without removal of principal shores, where required to remain in place. 3.3 ERECTION A. Erect formwork, shoring and bracing to achieve design requirements, in accordance with requirements of ACI 301. B. Provide bracing to ensure stability of formwork. Strengthen formwork liable to be overstressed by construction loads. C. Provide chamfer strips on external corners of walls. D. Obtain approval before framing openings in structural members which are not indicated on Drawings. E. Do not displace or damage vapor barrier placed by Section 03 30 00. F. Construct formwork to maintain tolerances in accordance with ACI 301. 3.4 APPLICATION OF FORM RELEASE AGENT A. Apply form release agent on formwork in accordance with manufacturer's instructions. Apply prior to placing reinforcing steel, anchoring devices, and embedded items. B. Do not apply form release agent where concrete surfaces are scheduled to receive applied coverings which may be affected by agent. Soak contact surfaces of untreated forms with clean water. Keep surfaces wet prior to placing concrete. 248 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 03 10 00 - 3 CONCRETE FORMWORK 3.5 INSERTS, EMBEDDED PARTS, AND OPENINGS A. Provide formed openings where required for work embedded in or passing through concrete. B. Coordinate work of other Sections in forming and setting openings, slots, recesses, chases, sleeves, bolts, anchors, and other inserts. C. Install accessories in accordance with manufacturer's instructions, level and plumb. Ensure items are not disturbed during concrete placement. 3.6 FORM REMOVAL A. Do not remove forms and bracing until concrete has sufficient strength to support its own weight and imposed loads. B. Do not damage concrete surfaces during form removal. C. Store reusable forms for exposed architectural concrete to prevent damage to contact surfaces. 3.7 CLEANING A. Clean forms to remove foreign matter as erection proceeds. B. Ensure that water and debris drain to exterior through clean-out ports. 3.8 EARTH FORMS A. Construct wood edge strips at top sides of excavations as indicated on drawings. B. Provide forms for footings and foundation walls wherever concrete cannot be placed against solid earth. C. Remove loose dirt and debris from form area prior to concrete placement. D. When earth formed foundations are used, the minimum formwork shown on the drawings is mandatory to insure clean excavations prior to and during concrete placement. END OF SECTION 249 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 03 20 00 - 1 CONCRETE REINFORCEMENT SECTION 03 20 00 CONCRETE REINFORCEMENT PART 1 - GENERAL 1.1 SECTION INCLUDES A. Reinforcing steel bars for cast-in-place concrete. B. Support chairs, bolsters, bar supports, and spacers, for supporting reinforcement. 1.2 REFERENCES A. A. 2019 CBC California Building Code, (CCR) California Code of Regulations, Title 24, Part 2, Chapters 17 & 19 (ACI 318). B. ACI 301 - Specifications for Structural Concrete for Buildings. C. ACI 315 (SP-66) - Details and Detailing of Concrete Reinforcement. D. ACI 318 - Building Code Requirements for Reinforced Concrete. E. ASTM A82 - Cold Drawn Steel Wire for Concrete Reinforcement. F. ASTM A1064- Welded Steel Wire Fabric for Concrete Reinforcement. G. ASTM A615 - Deformed and Plain Billet-Steel Bars for Concrete Reinforcement. H. ASTM A706 - Standard Specification for Low Alloy Steel Deformed Bars for Concrete Reinforcement. I. AWS D1.4 - Structural Welding Code Reinforcing Steel. J. CRSI - Manual of Practice. K. CRSI - Placing Reinforcing Bars. 1.3 QUALITY ASSURANCE A. Perform concrete reinforcement work in accordance with CRSI Manual of Standard Practice. B. Conform to ACI 301 and ACI 315 (SP-66). C. Conform to CBC California Building Code, (CCR) California Code of Regulations, Title 24, Part 2. 1.4 CERTIFICATES A. Submit mill test certificates of supplied concrete reinforcing, indicating physical and chemical analysis. 250 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 03 20 00 - 2 CONCRETE REINFORCEMENT PART 2 - PRODUCTS 2.1 MATERIALS A. Reinforcing Steel: ASTM A615, Grade 60. Billet-steel deformed bars, uncoated finish. B. Steel Wire: ASTM A82, plain, cold drawn steel. 2.2 ACCESSORY MATERIALS A. Tie Wire: Minimum 16 gage annealed type. B. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during installation and placement of concrete including load bearing pad on bottom to prevent vapor barrier puncture. 2.3 FABRICATION A. Fabricate in accordance with ACI 315 (SP-66), providing concrete cover specified in Section 03 30 00. B. Locate reinforcing splices not indicated on Drawings at points of minimum stress. Indicate location of splices on shop drawings. C. Weld reinforcing bars in accordance with AWS D1.4. PART 3 - EXECUTION 3.1 INSTALLATION A. Before placing concrete, clean reinforcement of foreign particles or coatings. B. Place, support, and secure reinforcement against displacement. Do not deviate from alignment or measurement. C. Do not displace or damage vapor barrier required by Section 03 30 00. 3.2 FIELD QUALITY CONTROL A. Field inspection and testing will be performed under provisions of Section 01 40 00 . END OF SECTION 251 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-1 CAST-IN-PLACE CONCRETE SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Cast-in-place normal weight concrete, placement and finishing. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 32 13 13: Site Concrete Work. 3. Section 03 20 00: Concrete Reinforcing. 1.2 REFERENCES: A. 2019 CBC – California Building Code, (CCR) California Code of Regulations, Title 24, Part 2, Chapters 17A & 19A. B. American Concrete Institute (ACI) Publication: 1. AC I - 224R-01 Control of Cracking in Concrete Structures. 2. AC I - 224.3R-2013- Joints in Concrete. 3. AC I 301 - Structural Concrete for Buildings. 4. AC I 302.1R-15 - Guide for Concrete Floor and Slab Construction. 5. AC I 318-2014 - Building Code Requirements for Structural Concrete and Commentary C. American Society for Testing and Materials (ASTM) Standards: 1. ASTM A615 - Deformed and Plain Billet-Steel for Concrete Reinforcement. 2. ASTM A706 - Low-Allow Steel Deformed Bars for Concrete Reinforcement. 3. ASTM E 1745 - Water Vapor Retarders Used In Contact with Soil or Granular Fill Under Concrete Slabs. 4. ASTM C33 - Concrete Aggregates. 5. ASTM C94 - Ready-Mixed Concrete. 6. ASTM C150 - Portland Cement. 7. ASTM C171 - Sheet Materials for Curing Concrete. 252 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-2 CAST-IN-PLACE CONCRETE 8. ASTM C856-04 - Practice for Petrographic Examination of Hardened Concrete. 9. ASTM E-96 - Water Vapor Transmission of Materials. 10. ASTM E1155 - Test for Determining Floor Flatness and Floor Levelness. 11. ASTM F1869 - Test Method for Measuring Moisture Vapor Emission. 12. ASTM F2170 - Determining Relative Humidity in Concrete Floor Slabs Using In-Situ Probes. D. SSPWC - Standard Specifications for Public Works Construction, Latest Edition. 1.3 SUBMITTALS: A. Shop Drawings: Submit Shop Drawings: Shop drawings shall indicate locations of cast-in-place concrete Work and accessory items such as vapor barriers. Include details and locations of reinforcing, embedded items, and interfacing with other Work. B. Mix Design Data: Submit concrete mix designs as specified herein and in Article 2.02. 1. Submit name, address and telephone number of the concrete production facility which the contractor intends to engage to design the concrete mixes. Submit name and qualifications of the proposed concrete technologist. 2. Mix Design: Submit a concrete mix design for each strength and type of concrete indicated in the drawings or specified. Include water/cement ratio, source, size and amount of coarse aggregate and admixtures. Predict minimum compressive strength, maximum slump and air content percentage. Clearly indicate locations where each mix design will be used. 3. Test Reports: Submit copies of test reports showing that the proposed mixes produce concrete with the strengths and properties specified. Include tests for cement, aggregates and admixtures. Provide gradation analysis. C. Certificates: Submit certification that each of the following conforms to the standards indicated. 1. Portland cement: ASTM C150. 2. Normal weight concrete aggregates: ASTM C33. 3. Aggregates: Submit evidence that the aggregate is not reactive in the presence of cement alkalis. In the absence of evidence, aggregate shall be tested per ASTM C289. If results of test are other than innocuous, aggregates shall be tested per ASTM C1567 as reported per ACI 318 as modified by CBC, Section 1903A.5. 4. Curing materials: ASTM C171. D. Admixtures: Submit product data for proposed concrete admixtures. 1.4 QUALITY ASSURANCE: A. Inspection shall be performed by a representative of a testing laboratory selected by the Owner. Owner will pay for inspection costs. Notify the laboratory 24 hours in advance of time concrete is to be mixed. Notify the laboratory of postponement or cancellation of mixing within at least 24 hours of 253 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-3 CAST-IN-PLACE CONCRETE scheduling time. B. Contractor shall assist the testing laboratory in obtaining and handling samples at the project site and at the source of materials. 1.5 DELIVERY, STORAGE AND HANDLING: A. Store cement and aggregate materials so as to prevent their deterioration or intrusion by foreign matter. Deteriorated or contaminated materials shall not be furnished. B. Packaged materials shall bear the manufacturers and brand name label and shall be stored in their original unbroken package in a weather tight place until ready for use in the work. 1.6 PROJECT CONDITIONS: A. Cold Weather Requirements: Batching, mixing, delivering and placing of concrete in cold weather shall comply with the applicable requirements of ACI 306.1. B. Hot Weather Requirements: Batching, mixing, delivering and placing of concrete in hot weather shall comply with the applicable requirements of ACI 305R. C. Concrete temperature of freshly mixed concrete shall be determined per ASTM C1064. PART 2 - PRODUCTS 2.1 MATERIALS: A. Cement: ASTM C150. Portland Cement. Type(s) as indicated on drawings. B. Aggregates: Conform to the following standards: 1. Normal weight concrete: ASTM C33. 2. Aggregate shall be tested for Potential Alkali Reactivity of Cement-Aggregate Combinations per ASTM C289. 3. Nominal maximum size of coarse aggregate shall be no larger than: a. 1/5 the narrowest dimension between sides of forms, nor b. 1/3 the depth of slabs, nor c. 3/4 the clear spacing between individual reinforcing bars or wires, bundles of bars, individual tendons, or ducts. C. Water: Water for concrete mixes, curing and cleaning shall be potable and free from deleterious matter. D. Admixtures: Shall be shown capable of maintaining essentially the same composition and performance throughout the work as the product used in establishing concrete proportions in accordance with ACI 318, Section 3.6. 1. Admixtures containing chlorides or sulfides are not permitted. 254 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-4 CAST-IN-PLACE CONCRETE 2. Air-entraining admixtures shall comply with ASTM C260. Air-entrained admixtures shall not be used for floor slabs to receive steel trowel finish. 3. Admixtures for water reduction and setting time modification shall conform to ASTM C494. 4. Admixtures for producing flowing concrete shall conform to ASTM C1017. 5. Admixtures containing ASTM C845 expansive cements shall be compatible with the cement and produce no deleterious effects. 6. Silica fumes used as an admixture shall conform to ASTM C1240. E. Reinforcement Fibers: Chop strands of alkali-resistant polypropylene or nylon fibers added to the concrete mix for protection against shrinkage cracks. F. Expansion Joint Fillers: Preformed strips, non-extruding and resilient bituminous type, of thickness indicated, conforming to ASTM D1751. G. Curing Paper: Shall conform to ASTM C171 and consist of two sheets of kraft paper cemented together with a bituminous material in which are embedded cords or strands of fiber running in both directions. The paper shall be light in color, shall be free of visible defects, with uniform appearance. H. Floor Hardener: See Section: 03 35 15 Sealed Concrete Flooring I. Underlayment: Two component latex underlayment for filling low spots in concrete for both interior and exterior applications, from featheredge to a maximum of 3/8 inch in thickness. Underlayment shall be non-shrink and suitable for repairing exposed concrete surfaces and for underlayment of carpet, resilient, tile and quarry floor coverings. La-O-Tex by TexRite, Underlay C, RS by Mer-Krete Systems, Underlayment 962 by C-Cure, or equal. J. Grout: ASTM C1107, non-shrink type, pre-mixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing additives, capable of developing a minimum compressive strength of 8,000 psi at 7 days; of consistency suitable for application and a 30 minute working time. 2.2 CONCRETE MIX: A. Mix shall be signed and sealed by a Civil or Structural Engineer currently registered in the State of California. B. Strength of Concrete: Strengths and types of concretes shall be as indicated in the Drawings. Unless otherwise indicated or specified, concrete shall be provided with minimum 28-day strength as specified on the Drawings. C. The required strength and durability of concrete shall be determined by compliance with the proportioning, testing, mixing and placing provisions of CBC Chapter 19A. Concrete mix shall meet the durability requirements of ACI 318, Chapters 19 & 26. D. Concrete proportioning shall be determined on the basis of field experience and/or trial mixtures shall in accordance with CBC Sections 1903A, 1904A and ACI 318, Section 26.4. Proportions of materials shall provide workability and consistency to permit concrete to be placed readily into forms and around reinforcement under conditions of placement to be employed, without segregation or excessive bleeding. 255 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-5 CAST-IN-PLACE CONCRETE E. Ready-Mixed Concrete: Mix and deliver in accordance with requirements of ASTM C94. PART 3 - EXECUTION 3.1 GENERAL: A. Surfaces to receive concrete shall be free of debris, standing water, and any other deleterious substances before start of concrete placing. B. Time of Placing: Do not place concrete until reinforcement, conduits, outlet boxes, anchors, hangers, sleeves, bolts, and other embedded materials are securely fastened in place. Contact the Inspector at least 24 hours before placing concrete; do not place concrete until inspected by the inspector of record. C. Pouring Record: A record shall be kept on the Project site of time and date of placing concrete in each portion of structure. Such record shall be maintained on the Project site until Substantial Completion and shall be available for examination by the Architect and Inspector. 3.2 TOLERANCES: A. Concrete construction tolerances shall be as specified in ACI 117 and as modified herein. B. Floor Flatness (FF) and Floor Levelness (FL) shall be as indicated below: Specified Overall Value Minimum Local Value FF FL FF FL Slabs on ground: mechanical and electrical rooms, parking structures and mortar bed set tile and quarry flooring. 20 15 15 10 Slab on ground: carpet. 25 20 17 15 Slab on ground: thinset tile and resilient flooring. 35 25 24 17 C. Refer to ACI 302.1R, Tables 8.1 and 8.2 Slab on Ground and Suspended Flatness/Levelness Construction Guide, for recommended concrete placing and finishing methods. D. Floor Flatness and Floor Levelness shall be tested in accordance to ASTM E1155. Floor measurements shall be made within 48 hours after slab installation, and shall precede removal of shores and forms. 3.3 PREPARATION: A. Vapor Barrier: Before installation of screeds and slab reinforcement, install vapor barrier under slabs on grade, as indicated in the drawings. 256 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-6 CAST-IN-PLACE CONCRETE 1. Install in accordance to ASTM E1643. 2. Place vapor retarder sheeting with the longest dimension parallel with the direction of the concrete pour. 3. Laps or seams shall be overlapped 6 inches, or as recommended by manufacturer. Las and penetrations shall be sealed with the manufacturer’s recommended tape and/or mastic. 4. Inspector will inspect and mark areas of damage and insufficient installation of the vapor barrier sufficiently in advance of concrete placement. a. Deficiencies shall be corrected before concrete is placed. b. Patch damaged areas with vapor barrier overlapping four sides 6 inches and adhering with tape. 3.4 INSTALLATION: A. Conveying and Placing: 1. Concrete shall be placed only under direct observation of the inspector of record. Do not place concrete outside of regular working hours, unless the Inspector has been notified at least 48 hours in advance. 2. Concrete shall be conveyed from mixer to location of final placement by methods that will prevent separation or loss of materials. 3. Concrete shall be placed as nearly as practicable to its final position to avoid segregation due to re-handling or flowing. No concrete that has partially hydrated or has been contaminated by foreign materials shall be placed, nor shall re-tempered concrete or concrete which has been remixed after initial set be placed. 4. In placing concrete in columns, walls or thin sections, provide openings in forms, elephant trunks, tremies or other recognized devices, to prevent segregation and accumulation of partially hydrated concrete on forms or metal reinforcement above level of concrete being placed. Such devices shall be installed so that concrete will be dropped vertically. Unconfined vertical drop of concrete from end of such devices to final placement surface shall not exceed 6 feet. 5. Concrete shall be placed as a continuous operation until placing of panel or section is completed. Top surfaces of vertically formed lifts shall be level. 6. Concrete shall be thoroughly consolidated by suitable means during placement, and shall be thoroughly worked around reinforcement and embedded fixtures and into corners of forms. 7. Where conditions make consolidation difficult or where reinforcement is congested, batches of mortar containing same proportions of cement, sand, and water as provided in the concrete, shall first be deposited in the forms to a depth of at least one inch. B. Cold Weather: 1. Provide adequate equipment for heating concrete materials and protecting concrete during freezing or near-freezing weather. All ground with which concrete is to come in contact shall be free from frost. No frozen materials or materials containing ice shall be 257 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-7 CAST-IN-PLACE CONCRETE used. 2. The temperature of concrete at the time of placement shall not be below the minimum temperatures given in Table 3.1 of ACI 306.1. 3. Concrete shall be maintained at a temperature of at least 50° F. for not less than 72 hours after placing or until it has thoroughly hardened. Cover concrete and provide sufficient heat as required. When necessary, aggregates shall be heated before mixing. Special precautions shall be taken for protection of transit-mixed concrete. C. Hot Weather: 1. Concrete to be placed during hot weather shall comply with the requirements of ACI 318, Section 26.5.5. 2. Maintain concrete temperatures indicated in Table 2.1.5 of ACI 305R to prevent the evaporation rate from exceeding 0.2 pound of water per square feet of exposed concrete per hour. 3. Cool concrete using methods indicated in ACI 305R Appendix B. 4. Place and cure concrete as specified in ACI 305R Chapter 4. D. Compaction and Screeding: 1. Tamp freshly placed concrete with a heavy tamper until at least 3/8 inch of mortar is brought to surface. Concrete shall then be tamped with a light tamper and screeded with a heavy straightedge until depressions and irregularities are eliminated, and surface is true to finish grades or elevations. Remove excess water and debris. 2. Where slabs are to receive separate cement finish or mortar setting bed, continued tamping to raise mortar to surface is not performed. Laitance shall be removed by brushing with a stiff brush or by light sandblasting to expose clean top surface of coarse aggregate. E. Floating and Troweling: 1. When concrete has hydrated sufficiently, it shall be floated to a compact and smooth surface. After floating, wait until concrete has reached proper consistency before troweling. Top surfaces shall receive at least 2 troweling operations with steel hand trowel. Prior to and during final troweling, apply a fine mist of water frequently with an atomizing type fog sprayer. Omit troweling for slabs to receive a separate cement finish. 2. For interior finish slabs, final troweling shall provide a hard, impervious, and non-slip surfaces, free from defects and blemishes. Finished surface shall be within tolerances indicated in Article 3.02. Avoid burnishing. Do not add cement or sand to absorb excess moisture. F. Curing: 1. Length of time, temperature and moisture conditions for curing concrete shall be in accordance with ACI 308R & ACI 318 Section 26.5.3. 2. Forms containing concrete, top of concrete between forms, and exposed concrete surfaces after removal of forms shall be maintained in a thoroughly wet condition for at least 7 258 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-8 CAST-IN-PLACE CONCRETE consecutive days after placing. 3. If weather is hot or surface has dried out, spray surface of concrete slabs and paving with fine mist of water, starting not later than 2 hours after final troweling and continuing until sunset. Surface of finish shall be kept continuously wet until curing medium has been installed. 4. Immediately after finishing, monolithic floor slabs shall be covered with curing paper. Paper shall be lapped 4 inches at joints and sealed with waterproof sealer. Edges shall be cemented to finish. Repair or replace paper damaged during construction operations. G. Filling, Leveling and Patching: 1. Concrete slabs exhibiting high or low spots and indicated to receive resilient floor covering or soft floor covering, shall have surfaces repaired. High spots shall be honed, or ground with power-driven machines to required tolerances. Low spots shall be filled with latex underlayment, installed in strict accordance with manufacturer's written recommendations. 2. Holes resulting from form ties or sleeve nuts shall be solidly packed, through exterior walls, by pressure grouting with cement grout, as specified. Grouted holes on exposed surfaces shall be screeded flush and finished to match adjoining surfaces. H. Cement Base: Cement base shall be of the height, thickness, and shape detailed. Base shall be reinforced with one inch mesh, 18 gage, zinc-coated wire fabric. Base finish mixture shall be one part Portland cement, 2 parts of fine aggregate and one part pea gravel. Colored cement base shall include a chemically inert mineral oxide pigment in the mix. 3.5 FINISHING: A. Sacking: Exposed concrete curbs, walls, and other surfaces shall be sacked by an application of Portland cement grout, floated, and rubbed. Sacking shall not be performed until patching and filling of holes has been completed. Entire sacking operation for any continuous area shall be started and completed within the same day. 1. Mix one part Portland cement and 1-1/2 parts fine sand with sufficient water to produce a grout having consistency of thick paint. Wet surface of concrete sufficiently to prevent absorption of water from grout. Apply grout uniformly with a brush or spray gun, then immediately float surface with a cork or other suitable float, scouring wall vigorously. 2. While grout is still plastic, finish surface with a sponge-rubber float, removing excess grout. Allow surface to dry thoroughly, then rub vigorously with dry burlap to completely remove dried grout. No visible film or grout shall remain after rubbing with burlap. B. Cement Grout and Dry-Pack Concrete: Cement grout shall be mixed at the Project site and shall be composed of one volume of Portland cement and 2-1/2 volumes of fine aggregate. Materials shall be mixed dry with sufficient water added to make mixture flow under its own weight. When grout is used as a dry pack concrete, add sufficient water to provide a stiff mixture, which can be molded into a sphere. 3.6 EXPANSION AND CONSTRUCTION JOINTS: A. Construction Joints: Details and proposed location of construction joints shall be as indicated on the Drawings, located to least impair strength of structure, in accordance with the following: 259 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-9 CAST-IN-PLACE CONCRETE 1. Thoroughly clean contact surface by sand blasting entire surface not earlier than 5 days after initial placement. 2. A mix containing same proportion of sand and cement provided in concrete plus a maximum of 50 percent of coarse aggregate shall be placed to a depth of at least one inch on horizontal joints. Vertical joints shall be wetted and coated with a neat cement grout immediately before placing of new concrete. 3. Should contact surface become coated with earth, sawdust, or deleterious material of any kind after being cleaned, entire surface shall be re-cleaned before applying mix. B. Expansion Joints: Provide expansion joints where indicated in walks and exterior slabs. Space approximately 20 feet apart, unless otherwise indicated. Joints shall extend entirely through slab with joint filler in one piece for width of walk or slab. Joint filler shall be 3/8 inch thick, unless otherwise indicated. C. Tooled Joints: Slabs, walks and paving shall be marked into areas as indicated with markings made with a V-grooving tool. Marks shall be round-edged, free from burrs or obstructions, with clean cut angles and shall be straight and true. Walks, if not indicated, shall be marked off into rectangles of not more than 12 square feet and shall have a center marking where more than 5 feet wide. 3.7 TESTING: A. Molded Cylinder Tests: 1. Inspector or testing lab personnel will prepare cylinders and perform slump tests. Samples for concrete strength shall be taken in accordance to ASTM C172. Each cylinder shall be dated, given a number, point in structure from which sample was obtained, mix design number, mix design strength and result of accompanying slump test noted. 2. Separate tests of molded concrete cylinders obtained at same place and time shall be made at age of three days, seven days, and 28 days. A strength test shall be the average of the compressive strength of two cylinders, obtained from the same sample of concrete and tested at 28 days or at test age designated for determination of f'c. 3. Test cylinders shall be prepared at the Project site and stored in testing laboratory in accordance with ASTM C31, and tested in accordance with ASTM C39. B. Concrete Consistency: Measure consistency according to ASTM C143. Test twice each day or partial day's run of the mixer. C. Adjustment of Mix: If the strength of any grade of concrete for any portion of Work, as indicated by molded test cylinders, falls below minimum 28 days compressive strength specified or indicated, adjust mix design for remaining portion of construction so that resulting concrete meets minimum strength requirements. D. Air Content Testing: Measure in accordance to ASTM C173 or ASTM C231, for each composite sample taken in accordance to ASTM C172. E. Defective Concrete: 1. Should strength of any grade of concrete, for any portion of Work indicated by tests of molded cylinders and core tests, fall below minimum 28 days strength specified or indicated, concrete will be deemed defective Work and shall be replaced or adequately strengthened 260 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 30 00-10 CAST-IN-PLACE CONCRETE in a manner acceptable to the Architect 2. Concrete Work that is not formed as indicated, is not true within 1/250 of span, not true to intended alignment, not plumb or level where so intended, not true to intended grades and levels, contains sawdust shavings, wood or embedded debris, or does not fully conform to Contract provisions, shall be deemed to be defective Work and shall be removed and replaced. F. Concrete for Equipment Pads, Mechanical and Electrical Work: Unless otherwise indicated, strength shall have a minimum f’c as indicated on the Drawings. Exposed concrete shall be provided with a hand trowel finish with radius corners and edges. Form and place concrete where necessary as described in Section 03 10 00 Concrete Forming and Accessories, and reinforced as described in Section 03 20 00 Concrete Reinforcing. Calcium chloride shall not be furnished in any concrete mix provided for the installation of underground electrical conduits. For concrete encasement of more than one conduit, furnish 3/4 inch maximum aggregate. 3.8 PROTECTION: A. Protect the Work of this section until Substantial Completion. B. CLEAN UP: 1. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. At contractor’s expense. END OF SECTION 261 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 54 10 - 1 Gypsum Underlayment SECTION 03 54 10 GYPSUM UNDERLAYMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide high strength poured gypsum concrete underlayment with accessories as required for complete installation. 1. Provide special acoustical underlayment sound deadening system underneath gypsum concrete to achieve maximum possible impact isolation class (IIC). 1.2 ADMINISTRATIVE REQUIREMENTS A. Design Requirements: Completed system to provide maximum impact isolation class (IIC) rating possible for system indicated. B. Scheduling: Schedule application as late as possible during construction to avoid damage by heavy trades. 1. Schedule pour after installation of drywall to minimize damage to installed underlayment and to complete fire and sound seals. 1.3 SUBMITTALS A. Product Data: Submit manufacturer's literature. B. Shop Drawings: Submit for items of work not clearly dimensioned or detailed in manufacturer's product data. 1.4 QUALITY ASSURANCE A. Qualification of Installers: Manufacturer approved applicator using approved mixing/placement equipment. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in original unopened packages, protected from exposure to elements; remove damaged or deteriorated materials from premises. 1.6 PROJECT CONDITIONS A. Before, during and after installation, building interior shall be enclosed and maintained at temperature above 50 degrees F until structure and sub-floor temperatures are stabilized. B. Provide continuous heat and adequate ventilation to rapidly remove moisture from area until underlayment is dry; provide mechanical ventilation if necessary. 262 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 54 10 - 2 Gypsum Underlayment PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Maxxon Corp./Dura-Cap Gypsum Concrete. B. Hacker Industries, Inc./Firm-Fill High Strength Gypsum Concrete. C. USG Corp./Levelrock 2500. D. Maxxon Corp./Therma-Floor Gypsum Underlayment. E. Hacker Industries, Inc./Gyp-Span Radiant Floor Underlayments. F. USG Corp./Levelrock Brand Floor Underlayment RH (Radiant Heat). G. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Requirements: Provide high strength poured gypsum concrete underlayment with accessories. B. Gypsum Cement: Mill mixture of calcined gypsum and aggregate complying with ASTM C317. 1. Type: High strength gypsum concrete minimum 2500 psi compressive strength. C. Primer: As recommended by gypsum concrete manufacturer. 1. On old wooden structures use asphalt emulsion as recommended by gypsum concrete manufacturer. D. Sand: 1/16" or less washed mason, mortar or plaster sand. E. Water: Potable, free from impurities. F. Sealer: Provide manufacturer recommended sealer for gypsum underlayment to ensure sealing of underlayment and bonding of flooring systems to underlayment. G. Acoustical Underlayment: Manufacturer's standard dense acoustical underlayment for sound deadening system providing maximum impact isolation class (IIC) rating. 1. Basis of Design: Provide acoustical underlayment comparable to Maxxon Corp./Acousti-Mat 1/4 as integral part of gypsum concrete system. 2. Perimeter Isolation Board (PIB): Provide 1/4” thick perimeter isolation board integral with acoustical underlayment system. 3. Impact Isolation Class (IIC) Rating: Not less than IIC 50 or better unless otherwise noted based on Acoustical Consultant reports. 263 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 54 10 - 3 Gypsum Underlayment PART 3 - EXECUTION 3.1 PREPARATION A. Inspect subfloor for structurally sound condition required for type of underlayment and conditions under which work will be performed. 1. Start of work indicates acceptance of conditions. B. Inspect area to be poured for proper nailing of plywood and replace any areas of plywood that have weakened or delaminated during construction. C. Remove stud wall base plates in doors and other openings. D. Prevent leakage at cracks; fill cracks and voids with quick setting drywall patching material. E. Ensure area to be poured is clean and free of mud, oil, grease or other contaminants. F. Acoustical Underlayment: Install acoustical underlayment system in accordance with manufacturer's recommendations and installation instructions over prepared substrate for maximum impact isolation class (IIC) rating. 1. Treat joints and perimeter in accordance with manufacturer's recommendations. 2. Install perimeter isolation board (PIB) prior to installation of acoustical underlayment, extend PIB at least 1/4” above top of gypsum underlayment, and tape acoustical underlayment to PIB. 3.2 INSTALLATION A. Priming: Apply in accordance with manufacturer's recommendations for type of substrate and underlayment to be poured. B. Wood Renovations: Mop or squeegee asphalt emulsion over entire surface completely sealing old boards, not less than two hours nor more than 24 hours prior to installation of gypsum concrete. 1. Coverage of asphalt emulsion shall be one gallon per 100 sf unless otherwise recommended by manufacturer. C. Underlayment Application: Comply with manufacturer's recommendations and installation instructions for application indicated. 1. Mix gypsum concrete in accordance with manufacturer's recommendations for type of placement operation employed; do not exceed amounts of water determined by manufacturer. 2. Keep mixing and placement equipment clean and free of hardened lumps of gypsum concrete. 264 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 03 54 10 - 4 Gypsum Underlayment 3. Provide adequate equipment and personnel to ensure uniform, continuous flow of gypsum concrete at point of delivery without segregation and loss of material. D. Thickness: Comply with manufacturer's recommended minimum thickness for type of substrate. 1. Install gypsum concrete in one layer at 1" minimum thickness unless greater thickness indicated. E. Do not interrupt placement of gypsum concrete until entire section is completed; ensure no slurry is placed against underlayment that has obtained initial set, except at authorized joints. F. Immediately after placement, screed and level to required thickness and trowel to smooth, even plane. G. Provide adequate ventilation and heat, if necessary, after placement of gypsum concrete to ensure complete drying of underlayment. H. Seal gypsum underlayment in accordance with manufacturer recommendations and installation instructions. 3.3 CLEANING A. Clean spatter from supporting structure and walls before it sets. 3.4 FIELD QUALITY CONTROL A. Site Tests: Provide following tests. 1. Compressive Strength: In accordance with ASTM C 472 testing procedures, using 2" by 2" cube molds. 2. Record and identify each set of test specimens listing area underlayment is being placed. 3.5 PROTECTION A. During construction, place temporary wood planking over underlayment wherever it will be subjected to heavy wheeled or concentrated loads. B. Replace damaged work. END OF SECTION 265 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 04 22 00 - 1 Concrete Unit Masonry SECTION 04 22 00 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide concrete masonry unit construction, with mortar, reinforcement, anchorage, and accessories as required for complete installation. 1. Cut and fit concrete masonry for work of other trades. B. Work Installed But Not Furnished: Build in items supplied by other trades and suppliers. Structural steel. As indicated. 1.2 ADMINISTRATIVE REQUIREMENTS A. Pre-Installation Meeting: Convene not less than one week prior to commencing work of this section. Require attendance of parties directly affecting work of this section. 1. Review installation procedures and coordination required with related work. 1.3 SUBMITTALS A. Product Data: Furnish manufacturer's certificate concrete masonry units conform to specified standards. B. Shop Drawings: Furnish drawings for reinforcing; show bar schedules, diagrams of bent bars, ties and arrangements and assemblies. C. Samples: Furnish section of exposed concrete masonry face indicating texture and color along with each type of colored mortar. 1.4 SITE CONDITIONS A. Temperature: Maintain materials to minimum 50 degrees F prior to, during and 48 hours after completion of masonry work. 1. Do not place masonry units when air temperature is below 40 degrees F. 2. During colder weather, work may continue where equipment is used to maintain constant temperature above 40 degrees F and masonry work completed and in progress is kept covered. 3. Protect masonry construction from direct wind and sun exposure when temperatures exceed 99 degrees F and relative humidity is less than 50 percent. B. Bracing: Provide temporary bracing during erection of masonry work, maintain in place until building structure provides permanent bracing. 266 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 04 22 00 - 2 Concrete Unit Masonry PART 2 - PRODUCTS 2.1 MATERIALS A. System Description Includes: Provide concrete masonry unit construction, with mortar, reinforcement, anchorage, and accessories as required for complete installation. B. Regulatory Requirements: Perform concrete unit masonry work in accordance with requirements of California Building Standards Code except where more restrictive requirements are specified. C. Concrete Masonry Units: Hollow loadbearing units conforming to ASTM C90. 1. Concrete Masonry Manufacturers: a. Angelus Block, Co., Inc. b. Orco Block Co., Inc. c. Substitutions: Refer to Section 01 25 00. 2. Weight: Provide medium weight units unless specific weight classification is indicated. a. Medium Weight, 105 to 125 pcf. 3. Compressive Strength: Comply with ASTM C90, with minimum 2000 psi per unit when tested in accordance with ASTM C140. 4. Size: Nominal 8" by 16" face measurement with thickness as indicated on Drawings. 5. Exposed Face Surfaces: Dense with uniform texture and color throughout Project. 6. Exposed Face Surfaces: Dense with finish as approved by Architect prior to manufacturing; uniform texture and color throughout Project. a. Texture: precision, smooth b. Colors: standard gray 7. Special Shapes: Provide proper specially shaped units for bond beams, lintels, corners and jambs. a. Exposed Special Shapes: Design bond beams, lintels, corners and jambs and fillers to match and compliment block units; where required perform cutting with masonry saw. 267 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 04 22 00 - 3 Concrete Unit Masonry D. Mortar: Conform to ASTM C270, Type S. 1. Masonry Cement/Premix Mortar: Acceptable only if manufacturer certifies product is made of cement and lime, with no limestone or pulverized material used in lieu of hydrated lime. E. Grout: Conform to ASTM C476; minimum compressive strength 2,000 psi. F. Mortar and Grout Materials: 1. Portland Cement: ASTM C150, Type I. 2. Hydrated Lime: ASTM C207, Type S. 3. Aggregates: Standard masonry mortar and grout type; clean, dry and protected against dampness, freezing and foreign matter. a. Mortar Aggregates: Conform to ASTM C144. b. Grout Aggregates: Conform to ASTM C404. 4. Water: Clean, drinkable, free of injurious amounts of oil, alkali, organic matter or other harmful materials. 5. Exposed Mortar Colors: Integral color as indicated, as directed by Architect where not otherwise indicated. G. Reinforcement and Anchorages: Provide reinforcing and anchorages as indicated on Drawings. 1. Deformed Bars: ASTM A615, Grade 60 for bars No. 3 and larger, unless otherwise indicated. 2. Plain Bars: ASTM A675, Grade 80 for No. 2 bars, unless otherwise indicated. 3. Joint Reinforcement: ASTM A82, free from mill scale and excess or loose rust deposits. H. Control Joints: Closed cell neoprene or PVC factory fabricated solid sections, resistant to oils and solvents, flexible at temperatures from 40-degree F after five hours exposure; ASTM D2240 minimum durometer 70. PART 3 - EXECUTION 3.1 PREPARATION A. Supply metal anchors required for concrete masonry to appropriate trades for placement; provide in quantities required for Project and direct placement. 1. Ensure items built in by other trades are properly located and sized. B. Establish lines, levels and coursing, protect from disturbance. 268 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 04 22 00 - 4 Concrete Unit Masonry C. Clean surfaces to receive masonry free from dirt, debris, and laitance. 3.2 INSTALLATION A. Do not wet concrete masonry units; lay units in mortar with full bed and head joints, properly jointed with other work. 1. Fully bond corners and intersections. 2. Align cells of units to maintain clear, unobstructed space for reinforcing and grout, keep cells free of mortar and debris. B. Do not shift or tap masonry units after mortar has taken initial set, where adjustment must be made, remove mortar and replace. C. Buttering corners of joints and deep or excessive furrowing of mortar joints is not acceptable. D. Perform job site cutting with proper power tools to provide straight, true, unchipped edges. E. Provide structural anchorage or retention in accordance with applicable code requirements. F. Ensure masonry courses are of uniform height, make vertical and horizontal joints equal and of uniform thickness. 1. Lay concrete unit masonry in running bond. 2. Course one block unit and one mortar joint to equal 8". G. Remove excess mortar and projections, take care to prevent breaking block corners. H. Tolerances: 1. Maximum allowable variation from masonry unit to adjacent masonry unit is 1/32" where masonry units are exposed in finished construction and where waterproofing is applied over masonry units. 2. Maximum allowable variation from plane of wall is 1/4" in 10 feet, and maximum 1/2" in 20 feet or more. 3. Maximum allowable variation from plumb is 1/4" per story, non-cumulative, and maximum 1/2" in two or more stories. 4. Maximum allowable variation of level coursing is 1/8" in 3 feet, 1/4" in 10 feet and 1/2" in 30 feet. I. Mortar Joints: Compress joints with a round or curved metal tool. 269 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 04 22 00 - 5 Concrete Unit Masonry 1. Compress mortar joints with jointing tool with minimum diameter three times width of mortar joint, to provide a flush surface where resilient base or waterproofing is to be applied over masonry. J. Reinforcement and Anchorage: Fully reinforce corners and intersections. Lap splices minimum 6". Extend splices minimum 16" each side of openings. 1. Support and secure reinforcing bars to maintain within 1/2" of dimensioned position. 2. Retain vertical reinforcement in position at top and bottom of cells and at intervals not to exceed 192 bar diameters. K. Grouting: Place grout when concrete masonry units are surface dry; consolidate and reconsolidate by mechanical vibration. 1. Fine Grout: Use for spaces less than 2" in width using low lift grouting techniques. 2. Coarse Grout: Use for spaces 2" or more in width. 3. When grouting is stopped for more than one hour, terminate grout approximately 2" below top of upper masonry unit to form positive key for subsequent grout placement. 4. Low-Lift Grouting: Place first lift of grout at 16" and place subsequent lifts at 8" increments. L. Built-In Work: As work progresses, build in frames, lintels, nailing strips, anchor bolts, plates, and other items supplied by other trades. 1. Build in items plumb and true. 2. Do not build in organic materials which will be subject to rot or deterioration. 3. Bed anchors of frames in mortar joints; fill frame voids solid with mortar; fill masonry cores with grout minimum 12" from framed openings. M. Cutting and Fitting: Cut and fit for chases, pipes, conduit, sleeves, and grounds; coordinate with work of other Specification sections to ensure correct size, shape and location. 3.3 CLEANING A. Remove excess mortar and smears upon completion of masonry work. B. Point or replace defective mortar, match adjacent work. C. Clean soiled surfaces using a non-acidic solution which will not harm masonry or adjacent materials, consult masonry manufacturer for acceptable cleaners. D. Use non-metallic tools in cleaning operations. 270 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 04 22 00 - 6 Concrete Unit Masonry 3.4 PROTECTION A. Maintain protective boards at exposed external corners which may be damaged by construction activities; protect without damaging completed work. END OF SECTION 271 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 1 STRUCTURAL STEEL SECTION 05 12 00 STRUCTURAL STEEL PART 1 - GENERAL 1.01 SUMMARY A. Section includes: Furnish and Installation of structural framing members, complete in place with required bracing, weld washers, nuts, shims, anchor bolts, and baseplates as indicated on the Drawings and specified herein. B. Related Sections: 1. Miscellaneous metals, refer to Section 05 50 00 1.02 REFERENCE STANDARDS A. Refer to the following for information regarding materials and installation methods necessary: 1. California Building Code (CBC) 2022, Chapters 22 and 35, as adopted by Title 24, and Chapter 7, Section 704 Protection of Structural Members. a. Refer to Drawings for details, design numbers, and ratings. 2. On-Site Welding Requirements, Title 24, Part 9, Articles 49 and 74. 3. American Society for Testing and Materials: Specifications A36, A53, A108, A123, A153, A307, F3125 A490, A500, A501, A572, A653, A673, A780, A992, A1085, C1107, E23, F436, F959M F1554 AND F1852. 4. American Institute of Steel Construction (AISC) 360-16 & 341-16. 5. American Welding Society: AWS D1.1 and AWS D1.4 6. Steel Structures Painting Council (SSPC). 1.03 SUBMITTALS A. Submit Shop and Erection Drawings Prior to Fabrication: Notify Architect and Structural Engineer 2 weeks minimum prior to submitting for review. Prepare erection drawings by State registered Structural Engineer. Show welded connections, lengths of welds, profiles, sizes, spacing and locations of members, attachments, anchorages, framed openings, size and type of fasteners, cambers and live loads. Contractor shall be responsible for reviewing and verifying all dimensions on shop Drawings. 1. Splices and Deviations: Splices will be permitted only where and as shown on Drawings. Deviations from design drawings desired or required by fabricator are to be indicated on shop drawings by providing a heavy line around the feature on which deviation approval is being requested, showing complete detail and describing deviation proposed. Provide detail with a note specifically requesting approval of deviation by fabricator. Deviations or changes shall not be made without the approval of the Building Department. a. Refer to Division 1 of owner’s specifications (Revisions) Cost of such changes shall be borne by the Contractor. 272 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 2 STRUCTURAL STEEL B. Erection and Bracing Plan and Procedure: Refer to Section 1710, Title 8, California Code of Regulations. Employ a California State licensed Civil Engineer to prepare erection and bracing plan and erection procedure for structural steel including columns, beams, and girders, who will be responsible for compliance. Follow plan and procedure exactly. Maintain a copy at project site. Pay for costs involved. C. Scrap collection and recycling plan: Contractor shall collect and recycle scrap per city’s waste management requirements. 1.04 QUALITY ASSURANCE A. Tests and Inspections: Testing for steel shall be done in accordance with Title 24, Part 2, Section 1705. Inspection shall be in accordance with Title 24, Part 2, Table 1705 B. If structural steel can be identified by heat or melt numbers and is accompanied by mill analysis and test reports (identified stock shall not be tested), testing shall be in accordance with Title 24, Part 2, Section 2202A.1 and 2205A. D. Furnish test specimens from steel fabricator and take them under the direction of the Testing Agency. Machine each test specimen by Testing Agency to dimensions required by ASTM A370. E. Have testing agency pick up test specimens and make required tests. F. Costs of tests of identified stock will be paid for by Owner, unless tests fail to comply with the specifications, in which case the Owner will pay for testing, but backcharge the Contractor. G. Complete a 4-sided inspection of steel. Such inspection shall be paid for by the Owner. The Inspector of structural steel which is not fabricated within 25 miles of the project site, shall also be paid for by the Owner, but the Contractor shall pay for travel expenses. H. After fabrication and inspection, costs associated with re-inspection of defective or replaced materials shall be paid for by the Owner, but backcharged to the Contractor. I. Provide labor, equipment and facilities necessary for moving and handling materials to be inspected. J. Provide and pay for supervision by a registered Inspector of welding operations of frames with joints, including inspection for quality, penetration, and conformity of Drawings, and a report verifying that welding is adequate and was done in conformity of project requirements. 1. Visually inspect welds and have inspector present to approve welding and high strength bolting whether performed in fabricator's shop or at project site and inspect erection. Ensure testing laboratory compliance with regulations of the City and certify in writing, upon completion of work, that welding and high strength bolting has been performed in accordance with Drawings and these Specifications. Inspect grouting of column base plates. 2. Have testing laboratory check bolt tightness on not less than 10 percent of bolts selected at random in each high strength bolt connection. Follow procedures of ASTM F3125 A325 and F3125 A490. 3. Inspect all complete penetration welds and partial penetration welds by ultrasonic or other approved nondestructive tests. Inspect first pass of multi-pass welds 273 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 3 STRUCTURAL STEEL and groove welds. 4. Perform ultrasonic testing by specially trained, qualified technicians who operate equipment, examine welds and maintain a record of welds examined, defects found and disposition of each defect. Repair defective welds and retest. 5. Ultrasonically test welds at rate of 100 percent to establish welder qualifications. If rejectable defect rate is less than 5 percent, frequency may be reduced to 25 percent. If rate increases above 5 percent, continue 100 percent testing until rejectable defect rate again drops below 5 percent. Calculate percentages by individual welder. 6. Submit all preliminary, working and final documents required by subsection 1.04K. 7. Inspect all seam welds at HSS steel member. K. Comply with California Building Code (CBC) Title 24, Part 2, Sections 2213 and 1705. 1.05 PROJECT CONDITIONS A. Verify measurements, lines, grades, locations and details at project site. Conform to existing field conditions. PART 2 - PRODUCTS 2.01 MATERIALS AND COMPONENTS A. Structural Steel Members: Shall conform to the requirements of ASTM A6 and shall be fabricated according to AISC Practice and Specifications for Building. B. Structural plates, bars, etc., shall conform to ASTM 572, unless noted otherwise on drawings. Structural wide flange beams and columns shall conform to ASTM A992, Grade 50. C. Pipe columns shall conform to ASTM A1085. D. Tube members shall conform to ASTM A1085. E. All welding shall be done using the shielded electric arc process by AWS certified welders using AWS D 5.1, E70XX series electrodes. F. All welds used in primary members and connections in the lateral force systems shall be made with a filler metal that has a minimum Charpy V-notch toughness of 20 ft.-lbs. at minus 20 degrees F., as determined by AWS classification. G. Continuous inspection is required for all field and shop welding by an Inspector approved by the Building Department. H. Bolts shall conform to ASTM F3125 GR. A490, unless noted otherwise. I. Structural Steel Shop Drawings shall be reviewed by the Structural Engineer of Record prior to fabrication. J. Light gauge steel members shall conform to ASTM A446, Grade A. 274 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 4 STRUCTURAL STEEL 2.02 LIGHT STRUCTURAL STEEL A. Standard specifications for Hot-Formed Welded and seamless Carbon Steel Structural Tubing, ASTM 1085. 2.03 WELDING ELECTRODES A. Conform to AWS, Latest Edition, AWS 1.1. 1. Required strength of weld shall comply with CBC Title 24, Part 2, Section 1705A.2.5. 2.04 GALVANIZING Galvanize all structural steel exposed to weather. A. Provide hot-dip galvanizing in accordance with ASTM A123, Grade 90. B. Field Galvanizing: Provide ZRC, or other approved. 2.05 PRIMER B. Interior Primer – Provide interior primer 734149X red oxide by Rodda Co., or equal. Primer shall have a VOC content of 100 g/l (0.83 lb/gal) or less when calculated according to 40 CRF 59, Subpart D (EPA method 24). C. Clean, prepare and shop prime exterior members in accordance with SSPC-Paint 20 or SSPC-Paint 29 and compatible with top coats indicated on plans. Do not prime specific surfaces to be welded or which will be in direct contact with concrete or other cementitious materials. D. Clean, prepare and shop prime interior members in accordance with SSPC-Paint 23 and compatible with topcoats indicated on plans. Do not prime specific surfaces to be welded or which will be in direct contact with concrete or other cementitious materials. PART 3 - EXECUTION 3.01 EXAMINATION A. Surface Conditions: Prior to commencing work of this section, inspect the work of others and verify that such work has been properly completed and installed to allow for proper installation of materials and methods required of this section. 3.02 FABRICATION AND ERECTION A. Fabricate and assemble work by skilled workers using sizes and weights shown. Connections are to develop at least strengths shown, unless approved otherwise beforehand. Allow no splices except where shown. B. Drilling, Punching and Reaming: Hole burning to make or enlarge previous holes is not allowed. Prepare required holes in structural steel members for attachment or passage 275 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 5 STRUCTURAL STEEL of work of other trades. Where allowed, steel may be punched 1/16-inch larger than the nominal diameter of the bolt when thickness of the steel is equal to or less than the diameter of the bolt plus 1/8-inch. Where the steel is thicker than the diameter of the bolt plus 1/8-inch, the holes must be drilled or sub-punched and reamed. Diameter of the sub-punched holes, and the drill for sub-drilled holes, is to be 1/16-inch smaller than the nominal diameter of bolt to be installed. Precisely locate finished holes to ensure passage of bolts through steel assemblies without drifting. Enlarge holes only by reaming. Poor matching of holes is cause for rejection of work. C. 1. Storage and Care of Electrodes: Ensure that coatings of low hydrogen type electrodes are thoroughly dry when used. Use electrodes taken from hermetically sealed packages within four hours of the time the package is opened. Electrodes not used within this time period, and electrodes which have been exposed more than one hour to air having a relative humidity of 75 percent or greater, are to be dried for at least two (2) hours at 200 to 250 degrees F. before used, or are to be reconditioned according to manufacturer's printed recommendations. Electrodes dried or reconditioned, which are not used within four hours after drying is completed, are to be re-dried before use. Electrodes of any classifications that have been wet are not to be used under any conditions. 2. Preparation: Clean surfaces to be welded of paint, grease, scale, and foreign matter. Clean welds each time electrode is changed. Chip entire area of hand guided and controlled flame cut edges before welds are deposited. In general, surfaces made by automatic or mechanically guided and controlled equipment need not be ground or chipped before welded. 3. Procedures: During assembling and welding, hold components of a built-up member with sufficient clamps or other adequate means to keep parts straight and in close contact. Do no welding in wind until adequate protective screening has been set up. 4. Characteristics of Welds: After being deposited, brush welds and ensure they exhibit uniform section, smoothness of weld metal, feather edges without undercuts or overlays, and freedom from porosity and clinkers. Ensure through visual inspection at edges and ends of fillet welds there is good fusion and penetration into base metal. D. Bolting: 1. Common Bolts: Make connections with ASTM A307 common bolts only where indicated. 2. High Strength Steel Bolting: Where structural joints are made using high strength bolts, load indicator washers, and nuts tightened to a high tension, the materials, method of installation and tension control, types of wrenches to be used, and inspection methods are to conform to specifications for structural jointing using ASTM F3125 A490 bolts established by the Research Council on Riveted and Bolted Structural Joints of the Engineering Foundation and the following requirements: a. Provide high strength bolts with a suitable identifying mark placed on top of the head before leaving factory. b. Do tightening of nuts with properly calibrated wrenches, load 276 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 6 STRUCTURAL STEEL indicator washers, or turn of nut method; the minimum bolt tension for the size of bolt used is to be in accordance with tables listed in the above standards. c. Check calibrated wrenches individually for accuracy at least twice daily for actual conditions of application. d. Mark bolts that have been completely tightened with identifying symbol. e. Install load indicator washers in accordance with AISC specifications and Contract Drawings. f. Ensure that contact bearing surfaces and threads of bolted parts are free of scale, slag, and burrs which could prevent solid seating of parts. g. Bolt lengths are to be grip plus 1-1/4 inch. h. At moment connections perform welding prior to high-strength bolt tightening. 3. Load Indicator Washers: Provide as manufactured/ licensed by Cooper and Turner, or Bethlehem Steel. They may be used for field installation of high- strength bolts. These washers may not be substituted for any required washer, but may be used in conjunction with required washers. Tightening is to be in accordance with these specifications using high strength bolts. After sufficient bolts in a joint are snugged to draw the members into close contact, tightening should progress from the most rigid part to the free edges until the load indicators on bolts are closed to the required gap of 0.015 inches under bolt heads or 0.010 inches under the nuts. To prevent overtightening and damage to the bolts, do not completely close the gap. 4. Nuts, and Washers: Series F9t as manufactured by Cold Form Specialties or Bethlehem Steel, may also be used for field installation of high strength bolts. In multi-bolt joints, tighten nuts in stages, a little at a time, without breaking the spline in any one of them until the final stage, to minimize slackening of the installed bolts. 5. Inspection of high strength bolting shall comply with Title 24, Part 2, Sections 2213 and 1705. 6. Erector to touch-up all welds and bolts after inspection. E. Erection: 1. Erect structural steel by professional riggers, using proper hoists and equipment, carefully planned and laid out so that cutting shall not be necessary. Erect the work plumb, square and true to line. Provide temporary bracing and guys where necessary to provide for loads and stresses to which the structure may be subjected, including those due to erection equipment and its operation, and leave in place as long as necessary to safeguard parts of the work. 2. Temporary Connections: Securely bolt work to maintain the steel in proper position while bolting and welding is being performed. Align, plumb and level work prior to welding and final bolting. 3. Set column base plates in exact position as to alignment, level and elevation and support on steel wedges or equivalent until grout has properly set. Center of each base is to be true to the column center within 1/16-inch and adjusted to its 277 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 7 STRUCTURAL STEEL elevation to 1/32-inch. Exactly level plates on both axes. 4. Sequence: Carry out the erection of steel in the proper sequence with the work of others. Frame, bed and anchor to concrete and related work in accordance with detailed drawings and setting diagrams. 5. Erection Tolerance: Follow AISC except as follows: a. Vertical dimensions measured from top of beams at their connections at any one column, not varying more than 1/4-inch plus or minus per story or, when accumulative from floor to floor, not exceeding 3/8-inch per story exclusive of column shortening due to dead load. b. Floor level is considered level if floor framing members on any one floor measured from top of column connections do not vary by more than 1- 1/2 inch plus or minus. c. Plumb displacement center line of columns from established column line, no more than 1 inch toward or away from established center line. d. Horizontal dimension variances governed by column displacement. 6. Perform erection with suitable equipment, of adequate capacity and design with due regard for personnel and public safety and as not to deflect or stress members beyond reasonable limits. Maintain erection and temporary bracing plan at project site in accordance with Title 8, California Code of Regulations. 7. Damaged Members During Erection: Straighten or replace members which are bent, twisted or damaged as directed. If heating is required in straightening, perform heating by methods which ensure uniform temperatures throughout entire member. When directed, remove members which are damaged to an extent impairing their appearance, strength or serviceability and replace with new members at no additional cost to Owner. 8. Anchor Bolt Rods: Provide with setting drawings and instructions. Verify position of bolts prior to delivery of steel; report errors or deviations for adjustment. F. Erection Bracing: Provide erection bracing immediately upon erection of members and leave in place until members are braced by balance of building. 3.03 PROTECTION A. Protection of Floors and Temporary Flooring: 1. Exercise caution to protect floor surfaces and adjacent work from damages. Do not overload floors. Provide only pneumatic mobile equipment with tires, for moving steel. Do not place steel members directly on concrete floors. Pads, timbers, or other materials for cushioning shall be used. 2. Provide necessary planking, scaffolding and temporary flooring in connection with erection of steel or support of erection machinery as part of the work. Conform use of temporary floors or steel deck to governing codes and regulations. 3. Temporarily tack weld steel deck to supports where used as a working platform. Distribute concentrated loads from welding machines or other heavy machinery by planking or other equivalent means. Replace steel deck damaged in using as working platform at no additional cost to Owner. 278 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 12 00 - 8 STRUCTURAL STEEL 3.04 CLEANING A. Shop Priming: 1. Clean surfaces according to SSPC and AISC recommendations, and apply specified primer to minimum 1.0 dry mil thickness. Ensure that primer is worked into joints. 2. Steel to be embedded into cementitious materials, permanently concealed steel surfaces, contact surfaces of high-strength bolted connections, and surfaces to receive fireproofing are not to be primed. END OF SECTION 279 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 30 00 - 1 METAL DECKING SECTION 05 30 00 METAL DECKING PART 1 - GENERAL 1.01 SUMMARY A. Provisions of Division 01 apply to this section. B. Section Includes: 1. Metal decking as indicated. C. Related Sections: 1. Section 01 40 00: Per Division 1 of owner’s specifications 3. Section 05 12 00: Structural Steel 4. Section 07 60 00: Flashing and Sheet Metal. D. Referenced Standards 1. Conform to current adopted reference standards by date of issue of the current code cycle and the Date of the Contract Documents. 2. 2019 CBC – California Building Code, (CCR) California Code of Regulations, Title 24, Part 2, Chapters 17, 22, and Section 2210. 3. ASTM A36 - Specification for Structural Steel. 4. ASTM A 108 - Specification for Steel Bars, Carbon, Cold-Finished, Standard Quality. 5. ASTM A572 - Grade 50, Structural Steel. 6. ASTM A653/A653M-98 - Sheet Steel, Zinc-Coated (Galvanized) or Zinc - Iron Alloy Coated by the Hot- Dip Process. 7. ASTM A 1008 - Steel, Sheet, Cold-Rolled, Carbon, Structural, High- Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability. 8. AWS D 1.1 - Structural Welding Code. 9. AWS D 1.3 - Structural Welding Code, Sheet Steel. 1.02 SYSTEM DESCRIPTION A. Performance Requirements: Compute properties of deck sections on basis of effective design width as limited by provisions of the AISI specifications. Provide no less than deck section properties specified, including section modulus and moment of inertia per foot of width. B. Regulatory Requirements: 280 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 30 00 - 2 METAL DECKING 1. Work of this section shall be in accordance with CBC. 1.03 SUBMITTALS A. Shop Drawings: Drawings, sections and details indicate type of decking, location, finish, gage of metal, arrangement of sheets, necessary fabrication to incorporate decking into the Work, and relationship to openings and flashing. 1.04 QUALITY ASSURANCE A. General: Metal decking steel shall conform to requirements of strengths and properties of standards specified. B. Qualifications of Welders: Properly certified for the type of Work involved in compliance with CBC requirements. D. Identification of metal decking steel shall conform to the standards specified in Section 01 40 00: Per Division 1 of owner’s specifications. 1. Fabricator shall furnish sufficient evidence to the Architect attesting compliance with specified requirements. 2. Conform to CBC requirements. Unclassified or unidentified decking is not permitted. Furnish deck manufacturer's certified mill analyses and test reports for each heat covering decking having Fy of 33 Ksi or less. In addition, for decking having Fy greater than 33 Ksi, testing laboratory shall perform one tension and elongation test and one bend or flattening test for each gage. E. Unidentifiable Steel: Steel which is not readily identifiable as to grade from markings and test records is not permitted to be provided as part of the Work of this section. F. Payment For Tests and Inspections: 1. Owner shall pay inspection and testing costs of identifiable steel. PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. BHP Steel Building Products, Inc. B. Verco Manufacturing Co. C. Members of Steel Deck Institute (SDI). E. AEP Span 281 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 30 00 - 3 METAL DECKING 2.02 MATERIALS A. Metal Decking: Roll-formed sheets conforming to ASTM A653 Grade 50 minimum, with G90 zinc coating. 1. Section properties shall conform to applicable provisions of latest edition of AISI - Specification for the Design of Cold-Formed Steel Structural Members. B. Flexible Closure Strips for Deck: Vulcanized, closed-cell, expanded chloroprene elastomer, complying with ASTM D 1056, Grade SCE #41. 1. Brittleness Temperature: Minus 40 degrees F, ASTM D 746. 2. Flammability Resistance: Self-extinguishing, ASTM D 1692. C. Metal Flashing and Closures: 22 gage minimum, with ASTM A653, G90 zinc coating, unless noted otherwise on drawings. D. Shear Connectors: Headed stud type, ASTM A 108 Grade 105 or 1020, cold- finished carbon steel complying with AISC specifications. 2.03 FABRICATION A. Corrugated sheets or sections shall be designed to support required live load between supporting members. B. Wherever practical, provide decking in lengths to span over three or more supports. C. Except as detailed otherwise, provide decking with interlocking side laps, 2-1/2 inches minimum end bearing, and 1-1/2 inches minimum side bearing. D. Welding: Provide materials and methods in accordance with recommendations of steel decking manufacturer and reviewed submittals. Hold decking tight to the supporting elements with screws or other means for proper welding or crimping of the decking edges. Conform to AWS D1.3, CBC Standards, and to the patterns and weld types indicated, with welds free from sharp edges and protrusions. Field coat welds and abraded surfaces at completion with a anodic type galvanizing repair paint. Omit the field paint coating where welds or abrasions are covered by concrete fill or sprayed fireproofing. PART 3 – EXECUTION 3.02 INSTALLATION A. Install metal decking in accordance with decking manufacturers' recommendations, requirements of Drawings, Shop Drawings, and Specifications. 282 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 05 30 00 - 4 METAL DECKING B. Install metal decking on supporting steel framework and adjust to final position before permanently fastening in place. 1. Install each unit to proper bearing on supports. 2. Install units in straight alignment for entire length of run of cells with close registration of cells of one unit with those of abutting unit. C. Fasten decking to steel framework at ends of units and at intermediate supports. Welding shall be as indicated on Drawings. D. Fasten side laps between supports as indicated on Drawings. E. Perform field cutting parallel with cells in area between cells, leaving sufficient horizontal material to permit welding to support steel. F. Weld shear connectors to supports thru decking units as required by Drawings. Weld only on clean, dry surfaces. Do not weld shear connectors thru two layers of decking units. 3.03 METAL FLASHINGS AND CLOSURES A. Furnish, install, and weld in position, sheet metal closure flashing, closure angles, closure plates, profile plates, and shear plates. B. Close open ends of cell runs at columns, openings, walls, similar interruptions and termination. 3.05 CLEAN UP A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. 3.06 PROTECTION A. Protect the Work of this section until Substantial Completion. END OF SECTION 283 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 05 40 00 - 1 Cold-Formed Metal Framing SECTION 05 40 00 COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide non-load bearing metal framing, 18-gage and heavier, with anchorage and bracing, and with accessories as required for complete installation. B. Related Sections: 1. Section 09 21 00: Light gage framing. 2. Section 09 24 00: Metal furring and lathing for plaster. 1.2 REFERENCES A. American Iron and Steel Institute (AISI): Specifications for Design of Cold-Formed Steel Structural Members. B. National Association of Architectural Metal Manufacturers (NAAMM): Standard ML/SFA 540, Lightweight Steel Framing Systems Manual. C. American Welding Society (AWS) D1.3: Structural Welding Code - Sheet Steel. 1.3 ADMINISTRATIVE REQUIREMENTS A. Pre-Installation Meeting: Prior to fabrication of components, meet at Project with installers of doors, windows, mechanical, and electrical work to review areas of potential interference and conflicts. 1. Coordinate layout and support provisions for interfacing work. 1.4 SUBMITTALS A. Product Data: Submit manufacturer's literature. B. Shop Drawings: Indicate component details, framing of openings, and welds, type and location of mechanical fasteners and accessories, and items required of other work for complete installation. 1. Detail framing layout. C. Manufacturer Certification: Provide certification by manufacturer indicating compliance with Contract Documents and applicable codes. 1. Calculations: Where requested, submit calculations directly to enforcing agency. 284 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 05 40 00 - 2 Cold-Formed Metal Framing 1.5 QUALITY ASSURANCE A. Welder Qualifications: Use qualified welders and comply with AWS D1.3. B. Regulatory Requirement: Comply with CFC Chapter 35. PART 2 - PRODUCTS 2.1 SYSTEM MANUFACTURERS A. ClarkDietrich Building Systems. B. CEMCO. C. United Metal Products. D. Steel Stud Manufacturers Association Members. E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide non-load bearing metal framing, 18-gage and heavier, with anchorage and bracing, and with accessories as required for complete installation. B. Framing Members: Sheet steel conforming to ASTM A1003, A1011, or ASTM A653, formed into "C" shaped sections; with knurled sides and faces. 1. Gages: As indicated C. Track: Formed steel; channel shaped; same width as studs, for tight fit and as indicated. D. Bracing: Formed galvanized sheet steel; channel shaped. E. Plates, Gussets, Clips: Galvanized steel, of formed or sheet material as required for particular use. F. Fastenings: 1. Self-Drilling Self-Tapping Screws, Bolts, Nuts and Washers: Hot dip galvanized, ASTM A90. As indicated in drawings. 2. Anchorage Devices: Powder driven or drilled expansion bolts; or screws with sleeves. As indicated in drawings. 3. Welding: AWS D1.3, Structural Welding Code - Sheet Steel. G. Finish: 285 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 05 40 00 - 3 Cold-Formed Metal Framing 1. Framing at Exterior Walls: Galvanized, ASTM A924 and A653, minimum G60 coating. 2. Interior Framing: Galvanized 3. Accessories: Match framing finish. 2.3 FABRICATION A. Fabricate assemblies and framed sections of sizes and profiles indicated, with joints fitted and secured, reinforced, and braced to meet design requirements. 1. Comply with fabrication and connection recommendations of NAAMM ML/SFA 540, "Lightweight Steel Framing Systems Manual." B. Wire tying of framing components is not acceptable. C. Fabrication Tolerances: Fabricate panels to maximum allowable tolerance variation from plumb, level, and true to line of 1/8" in 10'-0". PART 3 - EXECUTION 3.1 INSTALLATION A. Install metal framing systems in accordance with manufacturer's printed instructions. 1. Comply with connection and erection recommendations of NAAMM ML/SFA 540, "Lightweight Steel Framing Systems Manual." B. Align top and bottom tracks, locating to wall layout; secure in place with screws or welding at maximum 16" on center and as indicated in drawings. C. Place studs not more than 2" from abutting walls and at each side of openings; connect studs to tracks using clips, ties, screws or welding, in accordance with manufacturer's instructions and as indicated in drawings. D. Construct corners using minimum three studs; double studs at openings and as indicated in drawings. E. Install intermediate studs above and below openings as indicated in drawings. F. Install framing between studs for attachment of mechanical and electrical items and as indicated in drawings. G. Erect studs, brace, and reinforce to develop full strength. H. Make provisions for erection stresses; provide temporary alignment and bracing. 286 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 05 40 00 - 4 Cold-Formed Metal Framing I. Assure framing provides true and flat surfaces, ready to receive finish, with maximum variance of 1/8" in 10'-0". 1. Panels: Maximum step in face and jog in alignment between panels is not to exceed 1/16". J. Touch-up protective coating damaged during handling and installation. 1. Exterior Framing: Use zinc-rich galvanizing repair paint for galvanized surfaces. END OF SECTION 287 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 05 50 00 - 1 Metal Fabrications SECTION 05 50 00 METAL FABRICATIONS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide stock and custom fabricated metal items scheduled at end of this Section and as indicated in drawings, complete in respect to function as intended. 1. Metal fabrications includes items made from stainless steel and steel shapes, plates, bars, strips, tubes, pipes and castings which are not a part of structural steel or metal systems specified elsewhere. 1.2 REFERENCES A. American Welding Society (AWS): D1.1, Structural Welding Code. B. National Association of Architectural Metal Manufacturers (NAAMM): 1. Pipe Rail Manual. 1.3 ADMINISTRATIVE REQUIREMENTS A. Railing Design/Build: Provide special engineering for railings to ensure railings comply with applicable codes and Contract Documents. 1.4 SUBMITTALS A. Product Data: Submit manufacturer's literature for products used in metal fabrications, including paint, grout and manufactured items. B. Shop Drawings: Submit for fabrication and erection of metal fabrications. Indicate profiles, sizes, connection, reinforcing and anchorage. 1. Provide templates for anchorage installation by others. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide stock and custom fabricated metal items. B. Steel Shapes, Plates and Bars: ASTM A36. C. Steel Pipe: ASTM A53, Type S seamless, grade as selected by fabricator and as required for design loading; minimum standard weight, STD or Schedule 40. 288 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 05 50 00 - 2 Metal Fabrications D. Castings: Gray iron, ASTM A48, Class 30; malleable iron, ASTM A47. E. Fasteners and Rough Hardware: Type required for specific usage; provide zinc- coated fasteners for exterior use or where built into exterior walls. F. Welding Materials: AWS D1.1, type required for materials being welded. G. Paint: Provide primers as recommended by paint manufacturers for substrates and paints specified in Section 09 90 00 – Painting and Coating. 1. Galvanizing Repair Paint: High zinc-dust content paint for regalvanizing welds in galvanized steel. 2.2 FABRICATION A. Fabricate items with joints neatly fitted and properly secured. B. Grind exposed welds continuous, smooth and flush with adjacent finished surfaces, and ease exposed edges to approximate 1/32" uniform radius. C. Exposed Mechanical Fastenings: Flush countersunk fasteners unobtrusively located, consistent with design of structure. D. Fit and shop assemble in largest practical sections for delivery. E. Make exposed joints flush butt type, hairline joints where mechanically fastened. 1. Fabricate joints exposed to weather in manner to exclude water or provide weep holes where water could accumulate. F. Supply components required for proper anchorage of metal fabrications; fabricate anchorage and related components of same material and finish as metal fabrication. G. Railings: Comply with California and ADA Standards access requirements and NAAMM "Pipe Railing Manual"; welded construction; cap exposed ends. Refer to drawings for exact configuration of railing and attachment and/or anchorage. See drawings for railings and guards with custom design; Corten steel panels. 1. Regulatory requirements: a. Top of gripping surfaces of handrails shall be 34” minimum and 38” maximum vertically above walking surfaces, stair nosings and ramp surfaces. Handrails shall be a consistent height above such surfaces. b. Clearances between handrail gripping surfaces and adjacent surfaces shall be 1-1/2” minimum. Handrail may be located in a recess if the recess is 3” maximum deep and 18” minimum clear above the top of the handrail. c. Handrail gripping surfaces shall be continuous along their length and shall not be obstructed along their tops or sides. The bottoms of handrail gripping surfaces shall not be obstructed for more than 20% of their length. Where 289 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 05 50 00 - 3 Metal Fabrications provided, horizontal projections shall occur 1-1/2’ minimum below the bottom of the handrail gripping surfaces. d. Handrail gripping surfaces with a circular cross section shall have an outside diameter of 1-1/4” minimum and 2” maximum. e. Handrail gripping surfaces with a non-circular cross section shall have an outside dimension of 4” minimum and 6-1/4” maximum, and a cross- sectional dimension of 2-1/4” maximum. f. Handrail gripping surfaces and any surfaces adjacent to them shall be free of sharp or abrasive elements and shall have rounded edges. g. Handrails shall not rotate in their fittings. h. Handrail gripping surfaces shall extend beyond and in the same direction of stair flights and ramp runs in accordance with CBC Section 11B-505.10. Such extensions are not required for continuous handrails at the inside turn of switchback or dogleg stairs and ramps. i. A 2” minimum high curb or a barrier shall be provided to prevent the passage of a 4” diameter sphere rolling off the sides of a ramp surface. Such a curb or barrier shall be continuous and uninterrupted along the length of the ramp per CBC Section 11B-405.9.2. j. Code: Comply with requirements of applicable codes for railing design, except where more restrictive codes are specified. 2. Handrails: a. Steel b. Aluminum. 3. Wall Rail Brackets: Stainless steel brackets as approved by Architect. 4. Wall Returns: 90° elbow return with 1/4" maximum clearance unless otherwise indicated. a. Provide wall plates only where indicated and where required by applicable codes. 5. Ladder Extensions: Provide 48" ladder extension device for fixed ladders under access hatches a. Manufacturers: 1) Bilco/LadderUP Safety Post. 2) O’Keeffe’s/Safety Post Model SP400. 3) Precision Ladder/Extend-A-Rail. 4) Substitutions: Refer to Section 01 25 00. 290 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 05 50 00 - 4 Metal Fabrications H. Finishes: Galvanize and prime paint exterior work and prime paint interior work unless otherwise noted in Schedule; comply with requirements of Section 09 90 00 - Painting and Coating for preparation and priming. 1. Thoroughly clean surfaces of rust, scale, grease and foreign matter prior to applying finish. 2. Do not shop prime surfaces in contact with concrete or requiring field welding; shop prime in one coat. 3. Galvanized Coating: Provide coating comparable to ASTM A924 and A653, minimum G90 hot dip galvanized coating. PART 3 - EXECUTION 3.1 EXAMINATION A. Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication, where possible; do not delay job progress; allow for trimming and fitting where necessary. 3.2 ERECTION A. Obtain Architect's review prior to site cutting or making adjustments which are not part of scheduled work. 1. Perform necessary cutting and altering for installation and coordination with other work. B. Install items square and level, accurately fitted and free from distortion or defects detrimental to appearance or performance. 1. Supply items required to be cast into or embedded in other materials to appropriate trades. 2. Ensure alignment with adjacent construction; coordinate with related work to ensure no interruption in installation. C. Make provision for erection stresses by temporary bracing; keep work in alignment. D. Field bolt and weld to match standard of shop bolting and welding; hide bolts and screws whenever possible, where not hidden, use flush countersunk fastenings. 1. Perform field welding in accordance with AWS D1.1. E. After installation, touch-up field welds and scratched and damaged surfaces; use primer consistent with shop coat or recommended for galvanized surfaces, as applicable. F. Replace items damaged in course of installation and construction. 291 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 05 50 00 - 5 Metal Fabrications 3.3 SCHEDULE A. Supply and install metal fabrications listed in Schedule, complete with anchorage and attachments necessary for installation. 1. Schedule lists principal items only, refer to Drawings for items not listed. B. Schedule: 1. Miscellaneous angles, plates and attachments to be set in concrete or masonry for anchorage of other items. 2. Iron and steel shapes, sleeves, anchors, connectors and fastenings required to complete construction work, and which are not provided in other Specification sections. a. Rough hardware, including bolts, fabricated plates, anchors, hangers, dowels and miscellaneous metals. b. Ledge and shelf angles, channels and plates not attached to structural steel, and for support of metal decking. 3. Millwork support brackets and misc. reinforcing 4. Partial height wall steel reinforcing END OF SECTION 292 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 06 10 50 - 1 Miscellaneous Rough Carpentry SECTION 06 10 50 MISCELLANEOUS ROUGH CARPENTRY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide miscellaneous wood blocking and plywood, including blocking for roofing, roof curbs, and related flashing. 1. Provide plywood panel boards. 2. Preservative treat wood members as indicated. B. Related Sections: 1. Section 06 18 00: Structural Glued-Laminated Timber 2. Section 06 20 00: Finish carpentry. 3. Section 06 40 00: Architectural woodwork. 1.2 REFERENCES A. Forest Products Society (FPS): National Design Specification for Stress Grade Lumber and its Fastening. 1.3 SUBMITTALS A. Product Data: Submit wood treatment certifications and instructions for proper use of each type of treated material. B. Wood Product Certification: Furnish certification indicating wood products are from “well-managed” forests. 1.4 QUALITY ASSURANCE A. Lumber Grades: Provide visible grade stamp of an agency certified by FPS. B. Lumber Standard: Comply with US Product Standard PS20 for each indicated use, including moisture content and actual sizes related to indicated nominal sizes. C. Plywood Standard: Comply with PS1 (ANSI A199.1). D. Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC) including SmartWood Program and Forest Conservation Program. 293 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 06 10 50 - 2 Miscellaneous Rough Carpentry PART 2 - PRODUCTS 2.1 MATERIALS A. System Requirements: Provide miscellaneous wood blocking and plywood, including blocking for roofing system and related flashing. B. Regulatory Requirements: Comply with applicable code requirements for miscellaneous rough carpentry. C. Blocking: Provide dimensional lumber graded in accordance with FPS Grading Rules; Construction Grade, Douglas Fir; minimum S-Dry. D. Plywood: Provide minimum APA C-D exterior (CDX) plywood; stress rated where spanning between supporting members; fire retardant treated; minimum 3/4" thick unless otherwise indicated. E. Plywood Panel Boards: Provide panel boards for electrical and communication panel boards; APA C-D plugged, interior type plywood with exterior glue, fire retardant treated; minimum 1/2" thick. F. Nails, Spikes and Staples: Galvanized; size and type to suit application. G. Bolts, Nuts, Washers, Lags, Pins and Screws: Medium carbon steel; galvanized; size and type to suit application. H. Fasteners: Provide fasteners as required for complete, secure installation of miscellaneous rough carpentry. 1. Solid Masonry or Concrete: Expansion shield and lag bolt type. 2. Steel: Bolts or powder activated type. 3. Concrete: Simpson or equal clips, anchored to concrete, as indicated. 2.2 FABRICATION A. Wood Preservation: Treat lumber and plywood to comply with applicable requirements of American Wood Preservers Association and applicable codes. 1. Decay Resistance Treatment: Pressure treat wood in accordance with AWPA U1 using preservative chemicals acceptable to authorities having jurisdiction and containing no arsenic or chromium. a. Treat wood members based on AWPA U1 Use Categories as appropriate to Project location and exposure. b. Kiln-dry wood to a maximum moisture content of 19% after treatment with water-borne preservative. 294 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 06 10 50 - 3 Miscellaneous Rough Carpentry PART 3 - EXECUTION 3.1 PLACEMENT A. Place miscellaneous rough carpentry true to lines and levels. B. Correlate location so attached work will comply with design requirements and be properly located. C. Construct members of continuous pieces of longest possible lengths. D. Fit carpentry work to other work; scribe and cope as required for accurate fit. E. Shim with metal or slate for bearing on concrete and masonry. F. Securely attach carpentry work to substrates by anchoring and fastening as required by recognized standards. 1. Provide washers under bolt heads and nuts in contact with wood. G. Wood Blocking: Provide blocking of S4S lumber not less than 1-1/2" wide and of thickness required to provide adequate support or to properly locate attached material. 1. Provide attachment to other work; form to shapes shown. 2. Countersink bolts and nuts flush with surfaces. 3. Remove temporary blocking when no longer needed. 4. Anchor to formwork before concrete placement. 5. Build into masonry as work progresses, cutting to fit masonry unit size involved. H. Plywood: Comply with recommendations of American Plywood Association (APA) for fabrication and installation of plywood work. END OF SECTION 295 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 06 18 00- 1 STRUCTURAL GLUED-LAMINATED TIMBER SECTION 06 18 00 STRUCTURAL GLUED LAMINATED TIMBER PART 1 - GENERAL 1.01 SUMMARY A. Provisions of Division 01 apply to this section. B. Section Includes: 1. Glued Laminated Wood Beams C. Referenced Standards 1. ANSI/ AITC Standard A190.1 and ASTM D3737 2. NDS- National Design Specification for Wood Construction. 3. PS-56 Structural Glued Laminated Timber 4. California Code of Regulations, Title 24, Part 2, California Building Code Chapter 23 5. ASTM D3024 – Dry Use Adhesive with Protein Base, Casein Type. ASTM D2559- Wet Use Adhesive. APA Specification AFG-01 – Adhesive for Field Gluing Plywood to Wood Framing. 1.02 DEFINITIONS A. Structural Glued-Laminated (Glulam) Timber: An engineered, stress-rated timber product assembled from selected and prepared wood laminations bonded together with adhesives and with the grain of the laminations approximately parallel longitudinally. 1.03 SUBMITTALS A. Shop Drawings: Show layout of structural glued-laminated timber system and full dimensions of each member. Indicate species and laminating combination, adhesive type, and other variables in required work. Including large-scale details of connections. 296 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 06 18 00- 2 STRUCTURAL GLUED-LAMINATED TIMBER 1.04 QUALITY ASSURANCE A. Manufacturer Qualifications: Provide factory-glued structural units produced by an AITC- or APA-licensed firm. B. Factory mark each piece of structural glued-laminated timber with AITC Quality Mark or APA trademark. Place mark on surfaces that will not be exposed in the completed work. C. Quality Standard: Comply with AITC A190.1, "Structural Glued Laminated Timber." 1.05 DELIVERY, STORAGE, AND HANDLING A. General: Comply with provisions in AITC 111, "Recommended Practice for Protection of Structural Glued Laminated Timber during Transit, Storage, and Erection." B. Individually wrap members using plastic-coated paper covering with water- resistant seams. PART 2 - PRODUCTS 2.01 STRUCTURAL GLUED-LAMINATED TIMBER A. General: Provide structural glued-laminated timber that complies with AITC 117-- MANUFACTURING or research/evaluation reports acceptable to authorities having jurisdiction. Provide structural glued-laminated timber made from a single species. B. Species and Grades for Structural Glued-Laminated Timber: Provide structural glued-laminated timber made from Douglas fir-larch that complies with combination symbols indicated. C. Adhesive: Wet-use type complying with ASTM D 2559. D. End Sealer: Manufacturer's standard, transparent, colorless wood sealer that is effective in retarding the transmission of moisture at cross-grain cuts and is compatible with indicated finish. E. Penetrating Sealer: Manufacturer's standard, transparent, penetrating wood sealer that is compatible with indicated finish. 297 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 06 18 00- 3 STRUCTURAL GLUED-LAMINATED TIMBER 2.02 FABRICATION A. Shop fabricate for connections to greatest extent possible, including cutting to length and drilling bolt holes. Dress exposed surfaces to remove planning or surfacing marks and to provide a finish equivalent to that produced by machine sanding with No. 120 grit sandpaper. B. Camber: Fabricate horizontal and inclined members of less than 1:1 slope with either circular or parabolic camber equal to 1/500 of span. C. End-Cut Sealing: Immediately after end-cutting each member to final length, apply a saturation coat of end sealer to ends and other cross-cut surfaces, keeping surfaces flood-coated for not less than 10 minutes. D. Seal Coat: After fabricating, sanding, and end-coat sealing, apply a heavy saturation coat of penetrating sealer on surfaces of each unit. 2.03 COMBINATION AND APPERANCE GRADE: A. AITC 24F-V4 & 24F-V8 in conformance with AITC 110. B. Appearance of Members: Industrial Grade C. Unit shall be fabricated for wet use. PART 3 – EXECUTION 3.01 EXAMINATION A. Examine substrates in areas to receive structural glued-laminated timber, with Installer present, for compliance with requirements, installation tolerances, and other conditions affecting performance of structural glued-laminated timber. Proceed with installation only after unsatisfactory conditions have been corrected. 3.02 INSTALLATION A. General: Erect structural glued-laminated timber true and plumb, with uniform, close-fitting joints. Provide temporary bracing to maintain lines and levels until permanent supporting members are in place. 1. Lift with padded slings and protect corners with wood blocking. 298 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 06 18 00- 4 STRUCTURAL GLUED-LAMINATED TIMBER 2. Install structural glued-laminated timber to comply with Shop Drawings. 3. Install timber connectors as indicated. B. Cutting: Avoid extra cutting after fabrication. Where field fitting is unavoidable, comply with requirements for shop fabrication. 3.03 ADJUSTING A. Repair damaged surfaces and finishes after completing erection. Replace damaged structural glued-laminated timber if repairs are not approved by Architect. 3.04 PROTECTION A. Do not remove wrappings on individually wrapped members until they no longer serve a useful purpose including protection from weather, sunlight, soiling, and damage from work of other trades. Coordinate wrapping removal with finishing work specified in Division 9. Retain wrapping where it can serve as a painting shield. END OF SECTION 299 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 20 00 - 1 Finish Carpentry SECTION 06 20 00 FINISH CARPENTRY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide finish carpentry with accessories as required for complete installation. 1. Provide wood trim, sills, chair rail, and wall base. B. Related Sections: 1. Section 06 40 00: Architectural woodwork; casework, countertops, and paneling. 1.2 REFERENCES A. Architectural Woodwork Standards, Edition 1, 2009, (AWS) adopted and published jointly by AWI, AWMA, and Woodwork Institute. 1.3 SUBMITTALS A. Product Data: Submit literature for manufactured items. B. Shop Drawings: Indicate materials and wood species, component profiles, fastening, and joining details, finishes, and accessories. C. Samples: Furnish samples of each type of finish carpentry. D. Certificates: 1. Assurance Options: AWS certification and monitored compliance programs will not be required for finish carpentry. 2. Wood Product Certification: Furnish certification indicating wood products are from FSC “well-managed” forests. 1.4 QUALITY ASSURANCE a. In addition, subcontractors and suppliers shall have not less than two years’ experience with CAL/Green requirements. 2. CALGreen Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks, and for composite wood products formaldehyde limitations. A. Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC). 300 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 20 00 - 2 Finish Carpentry 1.5 DELIVERY, STORAGE, AND HANDLING A. Do not deliver materials until site conditions are adequate to receive work; protect items from weather while in transit. B. Store materials indoors, in ventilated areas with constant but minimum temperature of 60 degrees F and maximum relative humidity of 25% to 55%. C. Do not begin installation of finish carpentry until space is fully enclosed and mechanical systems are fully operational. 1. Maintain interior installation areas at 70 degrees F and 50% to 55% relative humidity. D. Immediately remove from site materials with visible mold and materials with mildew. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide finish carpentry systems specified complying with Architectural Woodwork Standards (AWS) and including accessories as required for complete installation. B. Transparent Finished Interior Wood Trim: 1. Quality: AWS/Premium Grade. 2. Wood: Maple. 3. Texture: S4S. C. Transparent Finished Interior Wood Trim: 1. Quality: AWS/Premium Grade. 2. Wood: Ash D. Opaque Painted Interior Wood Trim: 1. Quality: AWS/Custom Grade. 2. Wood: White Birch or Poplar. 3. Texture: Surfaced. E. Opaque Painted Interior Wood Trim: 1. Wood: MDF 301 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 20 00 - 3 Finish Carpentry F. Anchors, Nails and Screws: Select the material, type, size and finish required by each substrate for secure anchorage; provide toothed steel or lead expansion bolt screws for drilled-in-place anchors. G. Wood Filler: Color to match wood being filled. 2.1 FABRICATION A. Fabricate finish carpentry items in accordance with specified quality standard. B. Use exposed fastening devices or nails only when approved and unavoidable; arrange neatly. PART 3 - EXECUTION 3.1 EXAMINATION A. Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication where possible; do not delay job progress, allow for trimming and fitting. B. Verify surfaces are ready to receive work and field measurements are as shown on shop drawings. 1. Beginning installation signifies acceptance of conditions. C. Ensure mechanical and electrical items affecting work are properly placed, complete, and have been inspected by applicable authorities prior to commencement of installation. D. Inspect each piece of finish carpentry and discard damaged and defective pieces. 3.2 INSTALLATION A. Install work consistent with specified AWS quality grade, plumb, level, true and straight with no distortions; shim as required, using concealed shims. 1. Prime paint surfaces in contact with cementitious materials prior to installation; comply with requirements of Section 09 90 00 – Painting and Coating. B. Secure work to blocking with countersunk, concealed fasteners and blind nailing as required for a complete installation. C. Scribe and cut for accurate fit to other finished work. D. Install finish carpentry in single, unjointed lengths for openings and for runs less than 10'-0". 1. For longer runs, use only one piece less than 10'-0" in any straight run; provide scarf joints between members. 2. Stagger joints in adjacent members. 302 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 20 00 - 4 Finish Carpentry 3. Cope at returns and miter at corners. E. Accessories: Install accessories in accordance with manufacturer's recommendations in locations indicated or as directed by Architect. F. Acceptable Tolerances: 1. Variation from True Position: Maximum 1/16" at any position and maximum 1/8" in any 10'-0" length. 2. Adjoining Surfaces of Same Material: No variation permitted. 3. Offset with Abutting Materials: Maximum 1/32". G. Preparation for Field Finishing: 1. Sand work smooth and set exposed nails and screws. 2. Apply wood filler in exposed nail and screw indentations and leave ready to receive site-applied finishes. 3. Seal concealed and semi-concealed surfaces; brush apply only, using primer consistent with finish coats specified under Section 09 90 00 – Painting and Coating. END OF SECTION 303 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 40 00 - 1 Architectural Woodwork SECTION 06 40 00 ARCHITECTURAL WOODWORK PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide mill fabricated architectural woodwork with accessories as required for complete finished installation including cabinetwork hardware. 1. Provide custom laminate millwork. 2. Provide custom wood veneer millwork. 3. Provide countertops. 4. Provide wood paneling. B. Related Sections: 1. 06 20 00 Finish Carpentry 1.2 REFERENCES A. North American Architectural Woodwork Standards, 3.1 (NAAWS). 1.3 SUBMITTALS A. Product Data: Submit manufacturer’s literature for manufactured items. B. Shop Drawings: Indicate materials and wood species, component profiles, fastening, joining details, finishes, and accessories. C. Samples: Furnish samples of each exposed finish. 1. Veneers: After approval of type of wood for veneer submit not less than three potential flitches of matching wood veneers to be reviewed by Architect each with enough veneering available for Project. a. Submit photographs with true color of each flitch. D. Wood Product Certification: Furnish certification indicating wood products are from FSC “well-managed” forests. 1.4 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks, for composite wood products formaldehyde limitations, and for paints and coatings. 304 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 40 00 - 2 Architectural Woodwork B. Fabricator Qualifications: Member of Sponsor of North American Architectural Woodwork Standards with minimum five years successful experience fabricating woodwork like that required for Project. C. Standards: Perform architectural woodwork in accordance with North American Architectural Woodwork Standards (NAAWS). D. Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC). E. Seismic Anchorage: Provide seismic anchorage for wall cabinets as required by California Code of Regulations (CCR), Title 24, Part 2. 1.5 DELIVERY, STORAGE, AND HANDLING A. Do not deliver architectural woodwork until site conditions are adequate to receive work; protect items from weather while in transit. 1. Allow architectural woodwork shop finish to completely dry prior to delivery to site; allow materials to off-gas volatile organic compound (VOC) emissions off site. B. Store materials indoors, in ventilated areas with constant but minimum temperature of 60-degrees F and maximum relative humidity of 25% to 55%. C. Do not begin installation of architectural woodwork until space is fully enclosed and mechanical systems are fully operational. 1. Maintain interior installation areas at 70 degrees F and 50% to 55% relative humidity. D. Immediately remove from site materials with visible mold and materials with mildew. At contractor’s expense. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide mill fabricated architectural woodwork with accessories as required for complete finished installation including cabinetwork hardware. B. Transparent/Stained Finished Casework: 1. Quality: NAAWS/Premium Grade frameless, flush overlay unless otherwise indicated. a. Special: Provide each single length section of casework in largest such sections as access and openings allow. 1) Multiple self-supporting units fastened together to form larger unit allowed only where access and openings do not allow single lengths. 305 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 40 00 - 3 Architectural Woodwork C. Plastic Laminate Finished Casework and Countertops: 1. Quality: NAAWS/Custom Grade frameless, flush overlay, unless otherwise indicated. a. Special: Provide each single length section of casework in largest such sections as access and openings allow. 1) Multiple self-supporting units fastened together to form larger unit allowed only where access and openings do not allow single lengths. 2. Plastic Laminates: a. Types: NEMA LD-3.1 high pressure laminates. 1) Horizontal Surfaces: General Purpose Type, nominal 0.050". 2) Vertical Surfaces: Vertical Surface Type, nominal 0.032". 3) Unexposed Surfaces: Balanced with 0.030" melamine backing sheet. 4) Formed Surfaces: Postforming Type, nominal 0.042". b. Manufacturers: 1) Formica Corp. 2) Wilsonart, Wilsonart Engineered Surfaces. Basis of Design 3) Nevamar Corp. Basis of Design 4) Abet Laminati Co. 5) Substitutions: Refer to Section 01 25 00. c. Solid Color Laminates: 1) Formica Corp./ColorCore2. 2) Wilsonart, Wilsonart Engineered Surfaces/Solicore. Basis of Design 3) Abet Laminati Co/Solid Colors. 4) Substitutions: Refer to Section 01 25 00. d. Colors: As indicated on Drawings or Finish Schedule. 3. Wood Core: Plywood or medium density fiberboard (MDF) or particleboard, with no added formaldehyde and free of toxic materials. D. Casework Hardware: Provide casework hardware items as required for complete installation as indicated; provide types as listed in North American Architectural Woodwork Standards for casework, but no less than following types. 1. Adjustable Shelf Standards and Supports: Match BHMA A156.9 B04073 adjustable standards and B04083 closed shelf rest brackets for mortis mounting; flush mounted in cabinet. 2. Cabinet Hinges: BHMA A156.9 B01602 or B01603 frameless European concealed type, minimum 160 degree opening, without spring closer. 3. Cabinet Hinges: BHMA A156.9 B014xx pivot (knife) type, polished chrome finish. 306 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 40 00 - 4 Architectural Woodwork 4. Cabinet Pulls: Back mounted wire type, 4" center to center, clear aluminum; as approved by Architect. 5. Drawer Slides: Full extension, rail mounted type, minimum 100 lb. capacity with ball-bearing rollers; self-closing. a. Manufacturers: 1) Accuride. 2) Knape & Vogt. 3) Blum. 4) Hettich International. 5) Substitutions: Refer to Section 01 25 00. 6. Cabinet Locks: Pin and tumbler slide bolt lock with five pin tumblers as approved by Architect, two keys each. 7. Magnetic Catches: BHMA 156.9 B03141. E. Quartz-Based Solid Polymer Countertops: Manufacturer's standard quartz-based polymer system with color throughout thickness; provide manufacturer recommended joint adhesive; exposed surfaces finished to match top. 1. Manufacturers: a. CaesarStone USA/CaesarStone. b. Silstone USA/Silstone Countertops. c. Formica Everform (Basis of Design) d. Substitutions: Refer to Section 01 25 00. 2. Quality: NAAWS/Premium Grade. 3. Type: Not less than 1/2" thick sheet; coordinate with bowls as indicated and as specified in Division 22. 4. Colors: As indicated on Finish Plan. F. Fry Reglet Reveals, trims, corners, etc. Powder coat finish, color: tbd. As indicated in drawings. G. Escutcheons where indicated. H. Grommits: Mockett. Round Wood and Resilient Ring type. Allow 20 ring type and 17 round wood type, 2 ½” dia. 2.2 FABRICATION A. General: Fabricate architectural woodwork in accordance with specified North American Architectural Woodwork Standards. B. Plastic Laminate: Apply plastic laminate finish in full uninterrupted sheets consistent with manufactured sizes. Make corners and joints hairline; slightly bevel arises. 307 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 40 00 - 5 Architectural Woodwork 1. Locate butt joints at least 2'-0" from cutouts. 2. Cap exposed edges with plastic laminate of same finish and pattern. 3. Apply laminate backing sheet to reverse side of laminate surfaces. 4. Provide cutouts for inserts, fixtures and fittings; verify locations from on-site dimensions. 5. Prime paint contact surfaces of cutouts. 6. Plastic Laminate Countertops: Square butt joints and self edging; applied plastic or metal edging not permitted. a. Splashes as indicated or as directed by Architect where not otherwise indicated. C. Countertops: Provide maximum sizes available. Locate butt joints at least 2'-0" from cutouts where more than one-piece countertops are required. 1. Make corners and joints hairline; slightly bevel arises. 2. Provide cutouts for inserts, fixtures and fittings; verify locations from on-site dimensions. 3. Splashes and edges as indicated or as directed by Architect where not otherwise indicated. D. Use exposed fastening devices or nails only when approved and unavoidable; arrange neatly. E. Assemble woodwork in shop in sizes easily handled and to ensure passage through building openings. 2.3 FINISHES PART 3 - EXECUTION 3.1 EXAMINATION A. Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication where possible; do not delay job progress, allow for trimming and fitting. 3.2 INSTALLATION A. Install work consistent with Architectural Woodwork Standards specified quality grade, plumb, level, true and straight with no distortions. 1. Shim as required, using concealed shims. 308 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 06 40 00 - 6 Architectural Woodwork B. Ensure mechanical and electrical items affecting architectural woodwork are properly placed, complete, and have been inspected by Architect prior to commencement of installation. C. Secure work to grounds, stripping and blocking with countersunk, concealed fasteners and blind nailing as required for a complete installation. D. Scribe and cut for accurate fit to other finished work. E. Install architectural woodwork under supervision of factory-trained mechanics. F. Attach architectural woodwork securely in place with uniform joints providing for thermal and building movements. G. Acceptable Tolerances: 1. Variation from True Position: Maximum 1/16" at any position and maximum 1/8" in any 10'-0" length. 2. Adjoining Surfaces of Same Material: No variation permitted. 3. Offset with Abutting Materials: Maximum 1/32". H. Preparation for Field Finishing: 1. Sand work smooth and set exposed nails and screws. 2. Apply wood filler in exposed nail and screw indentations and leave ready to receive site-applied finishes. 3. Seal concealed and semi-concealed surfaces; brush apply only, using primer consistent with finish coats specified under Section 09 90 00 - Painting and Coating. END OF SECTION 309 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 07 18 00 - 1 Traffic Coating SECTION 07 18 00 TRAFFIC COATING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide traffic-bearing, fluid applied, waterproof, elastomeric urethane coating with accessories as required for complete weather-tight traffic coating. 1.2 SUBMITTALS A. Product Data: Submit manufacturer’s literature including recommendations for surface conditioner, elastic flashing, joint cover sheet and crack sealants, and temperature range for application of traffic coating. B. Samples: Submit fully cured exposed finish materials in colors selected, with aggregate topping. C. Manufacturer Certifications: 1. Installer: Submit certification indicating Installer is an approved applicator. 2. Materials: Submit certification indicating materials comply with Contract Documents and are suitable for applications indicated. 3. Manufacturer’s Representative: Submit manufacturer’s representative’s field report indicating traffic coating has been installed in accordance with manufacturer’s recommendations and installation instructions. D. Maintenance Instructions: Submit manufacturer’s maintenance instructions. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for paints and coatings. B. Installer Qualifications: Firm with minimum five years successful experience in application of traffic deck covering on projects of comparable size and acceptable to traffic coatings manufacturer. C. Pre-Installation Meeting: Convene not less than one week prior to commencing work of this section. Require attendance of parties directly affecting work of this section. 1. Review installation procedures and coordination required with related work. 310 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 07 18 00 - 2 Traffic Coating 1.4 SITE CONDITIONS A. Comply with manufacturer recommendations for site conditions. Do not apply traffic coating during inclement weather or when air temperature is below 40-degrees F. B. Do not apply traffic coating to damp, dirty, dusty and unsuitable surfaces. 1. Allow concrete surfaces to cure minimum 28 days. 2. Moisture Content: Determine substrate moisture content using methods recommended by system manufacturer. 1.5 WARRANTY A. Extended Correction Period: Provide for correcting failure of system to resist water penetration except where failure is result of structural failure of building. Repair system and pay for or replace damaged materials and surfaces. 1. Hairline cracking due to temperature or shrinkage is not considered structural failure. 2. Period: Two years. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Gaco Western Ltd./GW-15-UBU (U-64C). B. The Neogard Corp./Peda-Gard and Auto-Gard. C. Dex-O-Tex Div. Crossfield Products Corp./Dex-O-Tex Elastatex 500. D. Substitutions: Refer to Section 01 25 00. 1. Option: Siplast/Terapro PMMA Liquid-Applied Traffic Bearing Waterproofing reinforced pedestrian system over occupied space. 2.2 MATERIALS A. System Requirements: Provide traffic-bearing, fluid applied, waterproof, elastomeric urethane coating with accessories. B. Regulatory Requirements, General: 1. Fire Ratings: Provide Underwriters Laboratories listed products with Class A rating for roofing assemblies, based on ASTM E108. 2. Volatile Organic Compound (VOC) Emissions: Comply with applicable requirements limiting volatile organic compound (VOC) emissions. 311 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 07 18 00 - 3 Traffic Coating a. Comply with applicable Air Quality Management District limitations for volatile organic compound (VOC) emissions. C. Regulatory Requirements, Slip-Resistance: 1. Slip-Resistant Hard Surfaces: Hard surface finishes to comply with requirements of authorities having jurisdiction for slip-resistant hard surfaces, including general code requirements and requirements for access for persons with disabilities. a. Subcontractor/Installer to verify hard surface material being installed has either manufacturer testing information indicating materials are suitable for locations indicated, or experience indicates such materials are appropriate. b. Notify Architect where hard surface materials may not be appropriate for applications indicated. D. Traffic Coating: One or two-part, solvent free low or no VOC 100 percent polyurethane elastomer without asphalt or tar modifiers, cold applied. 1. System: Provide manufacturer's standard system recommended for pedestrian type traffic. 2. Colors: Where color is not indicated on Drawings or Finish Schedule, provide standard color as directed by Architect. E. Surface Conditioner: Primer compatible with membrane compound; as recommended by traffic coating manufacturer. F. Reinforcing Mesh: Woven uncoated glass fiber mesh or comparable reinforcing recommended by system manufacturer and designed for and compatible with traffic coating. G. Joint and Crack Sealant: As recommended by traffic coating manufacturer. H. Non-Slip Aggregate: Manufacturer's standard aggregate of size and gradation recommended for application indicated. I. Accessories: Types recommended by traffic coating manufacturer to ensure complete, watertight installation. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine surfaces and conditions affecting traffic coating. B. Beginning installation indicates acceptance of surfaces and conditions. 312 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 07 18 00 - 4 Traffic Coating 3.2 PREPARATION A. Ensure drains, sleeves, curbs and projections which pass through traffic coating are properly and rigidly installed. B. Ensure surfaces are free of cracks, depressions, waves and projections which may be detrimental to proper installation of traffic coating; repair surfaces as required. C. Seal cracks and joints with recommended backup material and sealant; ensure proper depth-width ratio as recommended by sealant manufacturer. 1. Rout or saw-cut cracks exceeding 1/16" wide and fill with sealant. D. Clean surfaces of dust, dirt and foreign matter detrimental to proper installation of traffic coating. E. Metal Surfaces: Remove contaminants that may adversely affect adhesion or performance of traffic coating; apply metal primer. F. Use drop cloths or masking to protect adjacent surfaces; close off drains to prevent spillage and migration of materials into drains. 3.3 APPLICATION A. Apply traffic coating in accordance with manufacturer's recommendations and installation instructions. 1. Apply primer/surface conditioner to surfaces indicated to receive traffic coating. B. Apply bond breaker tape over joints in accordance with manufacturer's instructions. C. Apply and spread traffic coating to thickness recommended by manufacturer for specific application indicated. D. Seal items projecting through traffic coating. E. Install membrane flashings and seal into traffic coating. F. Embed aggregate in top course of system, using procedure recommended by manufacturer. G. After complete installation, close off area to prevent unauthorized traffic or work over traffic coating. 3.4 SITE QUALITY CONTROL A. Site Tests: Test traffic coating with 2" depth of water maintained for 24 hours; do not overload structure, if necessary, section off areas as approved by Architect. 1. Repair leaks revealed by examination of substructure and repeat test until no leakage is observed. 313 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 07 18 00 - 5 Traffic Coating B. Manufacturer's Field Services: Manufacturer’s representative to inspect traffic coating on regular basis and provide certification traffic coating has been installed in accordance with manufacturer's recommendations. END OF SECTION 314 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 21 00 - 1 Thermal Insulation SECTION 07 21 00 THERMAL INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide thermal batt insulation with integral vapor retarder and accessories as required for complete installation. B. Related Work: 1. Section 07 51 00: Insulation integral with built-up bituminous roofing. 2. Section 07 84 00: Firestopping. 3. Section 09 21 00: Acoustical insulation concealed in gypsum board systems. 1.2 ADMINISTRATIVE REQUIREMENTS A. Interior Vapor Retarders: Where specifications require foil faced vapor retarders as part of building thermal insulation system, intent is to prevent migration of spores from mold and mildew into interior building spaces. 1. Intent is to provide air barrier and vapor retarder on interior surface while allowing vapor to move through exterior wall vapor permeable surfaces, while vapor permeable water barriers are maintained at exterior side of wall. 1.3 SUBMITTALS A. Product Data: Furnish manufacturer's literature for each type of insulation. 1. Submit Underwriter's Laboratory approval numbers for required fire ratings; approvals of other laboratories contingent upon acceptance of applicable authorities. 1.4 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to energy efficiency. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide thermal batt insulation with integral vapor retarder and accessories. B. Thermal Batt Insulation: Preformed slag mineral or glass fiber with thermosetting resin binders, conforming to ASTM C665; formaldehyde-free. 1. Manufacturers: 315 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 21 00 - 2 Thermal Insulation a. Johns Manville/FSK-25 Thermal-Shield Insulation. b. Owens-Corning Fiberglas Corp./Fiberglas FS-25 Insulation. c. CertainTeed/Thermafiber FS25 Insulation. d. Substitutions: Refer to Section 01 25 00. a. Johns Manville/Thermal-Shield Insulation. b. Owens-Corning Fiberglas Corp./Fiberglas Insulation. c. CertainTeed/Thermafiber Insulation. d. Substitutions: Refer to Section 01 25 00. 2. R-Value: Minimum R-19 at walls, R-30 at horizontal surfaces, unless otherwise indicated. 3. Flame Spread/Smoke Developed Rating: Maximum 25/450, ASTM E84. 4. Vapor Retarder: Type III, aluminum vapor retarder on one side. 5. Vapor Retarder: Type I: No vapor retarder. 6. Combustibility: Pass ASTM E136. C. Penetration Type Insulation Supports: Galvanized or electroplated steel penetration supports with adhesive attachment to substrate and support disc. D. Vapor Retarder Tape: Minimum 2" wide self-adhering type designed to maintain vapor retarder integrity and complying with fire resistance ratings as required by applicable codes. E. Accessories: Furnish as recommended by insulation manufacturer for insulation types, substrates, and conditions involved. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify substrate and adjacent materials are dry and ready to receive insulation; beginning installation signifies acceptance of conditions. B. Ensure mechanical and electrical items affecting work are properly placed, complete, and have been inspected by Architect prior to commencement of installation. 3.2 INSTALLATION A. Install insulation in accordance with manufacturer's instructions with vapor retarder toward inside of building. B. Cut and trim insulation neatly, to fit spaces. 1. Backed Insulation: Use insulation free of ripped backs and edges. 316 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 21 00 - 3 Thermal Insulation C. Fit insulation tight within spaces and tight to and behind mechanical and electrical services within insulation plane; leave no gaps or voids; maintain integrity of thermal barrier. D. Friction fit in place; use tape or penetration supports as necessary to assure permanent installation. 1. Taping: Tape perimeters, joints, and tears in vapor retarder, including joints between insulation and surrounding construction, to ensure vapor-tight installation. 2. Penetration Supports: Cut or bend pins in locations accessible to maintenance personnel, to eliminate potential hazards from exposed pin points. END OF SECTION 317 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 26 00 - 1 Below-Grade Vapor Retarder SECTION 07 26 00 BELOW-GRADE VAPOR RETARDER PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide vapor retarder system for below grade and slab-on-grade concrete, including sealing joints and protrusions through vapor retarder. B. Install vapor barrier at trenches cut for floor recessed power/data. Tape vapor barrier to existing membrane in a like new manner. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's literature. 1.3 SITE CONDITIONS A. Do not apply vapor retarder during inclement weather or when air temperature is below 40 degrees F. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Fortifiber Corp./Ultra 15. B. Raven Industries, Inc./Vapor Block # VB 15 (15 mil Blue). C. Stego Industries, Inc./Stego Wrap (15 mil). D. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description Includes: Provide vapor retarder system for below grade and slab-on-grade concrete, including sealing joints and protrusions through vapor retarder and sand bed below vapor retarder. B. Vapor Retarder: ASTM E1745, Class A vapor retarder consisting of 15 mil polyolefin film. 1. Permeance: Maximum 0.025 perms, ASTM F1249 and E154 tests. 2. Resistance to Puncture: Minimum 2200 grams, ASTM D1709, Method B. 3. Tear Resistance: Minimum 8.74 lbs., ASTM D1004. 4. Tensile Strength: Minimum 35 lbs/in., ASTM E154, Section 9, Method D-882, in both directions. 318 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 26 00 - 2 Below-Grade Vapor Retarder C. Joint Sealer: Pressure sensitive tape as recommended by vapor retarder manufacturer and providing comparable permeance to vapor retarder. PART 3 - EXECUTION 3.1 PREPARATION A. Ensure sleeves, curbs and projections that penetrate vapor retarder are properly and rigidly installed. B. Ensure substrate is free of projections and irregularities that may be detrimental to proper installation of vapor retarder. 3.2 INSTALLATION A. Apply vapor retarder in accordance with manufacturer's recommendations and installation instructions and in accordance with ASTM E1643; comply with most restrictive where conflicts occur. 1. Seal items projecting through vapor retarder with pressure sensitive tape. B. Seams: overlap as much as practical, sealed with pressure sensitive tape for vapor tight seal. C. Lay vapor retarder membrane smooth with no fish-mouths or bunches of material. D. Inspect and repair vapor retarder prior to application of concrete slab; tape tears and repair damage. END OF SECTION 319 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 28 00 - 1 Weather Barrier/Underlayment SECTION 07 28 00 WEATHER BARRIER/UNDERLAYMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide weather barrier/underlayment air and water barrier systems for plaster, flashing, and penetrations with accessories as required for complete watertight installation. 1. Wall Underlayment: Provide vapor permeable fluid applied underlayment and flashing for exterior wall applications, with related concealed metal flashings and accessories as required for complete airtight and watertight installation. 2. Flashings and Sheet Metal Underlayment: Provide self-adhering sheet membrane underlayment at flashings and sheet metal, with accessories as required for complete watertight installation. 3. Self-Adhering Sheet Membrane (SASM) Flashing at Penetrations: Provide SASM flashing for around penetrations through membrane including windows, doors, and conduit, with accessories as required for complete watertight installation. B. Related Sections: 1. Section 07 60 00: Exposed metal flashing. 2. Section 09 24 00: Portland Cement Plaster 1.2 ADMINISTRATIVE REQUIREMENTS A. Weather Barriers: Provide weather barrier/underlayment systems which, with other building components, comply with applicable code requirements for air barriers and water barriers. 1. Air Barriers: Air barriers shall be as defined by applicable Energy Code requirements and shall include standard exterior wall components and air seal joint sealants specified in Section 07 90 00 – Joint Sealants. 2. Water Barriers: Water barriers shall be as defined by applicable Building Code requirements and shall include vapor permeable systems with or without rainscreen barriers intended to extend amount of water drained to exterior. 3. Self-Adhering Flexible Flashings: Intent of flexible flashings at window openings, door openings, and other wall penetrations is to ensure water cannot move from exterior surface past water barriers and into building. 320 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 28 00 - 2 Weather Barrier/Underlayment B. Pre-Installation Meeting: Convene one week prior to commencing work; require attendance of parties directly affecting underlayment. 1. Review procedures and coordination required with related work. 1.3 SUBMITTALS A. Product Data: Furnish manufacturer’s literature for each type of underlayment. B. Samples: Furnish samples of each material. 1.4 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives. 1.5 WARRANTY A. Extended Correction Period: Provide for correcting failure of system to resist damage from anticipated sources including damage from water penetration. Repair system and pay for or replace damaged materials and surfaces. 1. Period: Two years. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide weather barrier/underlayment air and water barrier systems for plaster, flashing and sheet metal, and penetrations with accessories. B. Regulatory Requirements: Provide materials conforming to applicable air quality management district limitations on volatile organic compound (VOC) emissions. C. Regulatory Requirements: Provide materials with minimum volatile organic compound (VOC) emissions available. D. Wall Underlay: Unperforated asphalt saturated organic felt, conforming to ASTM D226, Type I, and ASTM D4869 commonly referred to as No. 15. E. Wall Underlay: Provide vapor permeable fluid applied air and water barrier underlayment system for complete watertight installation as recommended by manufacturer for substrates and applications indicated. 1. Manufacturers: a. GCP Applied Technologies (Grace)/Perm-A-Barrier VPO Fluid Applied. b. WR Meadows Air Shield LSR c. DuPont Tyvek Fluid Applied WB+ 321 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 28 00 - 3 Weather Barrier/Underlayment d. Prosoco VB e. Henry Company/Air-Bloc VP. f. Carlisle Corp./CCW LiquiFiber-W. g. Substitutions: Refer to Section 01 25 00. 2. Provide specific membrane types as recommended by system manufacturers for each type of application. F. Sheet Metal and Flashing Underlayment: Self-adhering rubberized sheet membrane with primers and seam sealers as required for complete watertight installation; type as recommended by manufacturer for substrate and for applications indicated. 1. Manufacturers: a. GCP Applied Technologies (Grace). b. Henry Company. c. Carlisle Corp. d. Protecto Wrap Company. e. Substitutions: Refer to Section 01 25 00. 2. Provide specific membrane types as recommended by system manufacturers for each type of application. G. Self-Adhering Sheet Membrane (SASM) Flashing at Penetrations: SASM with primers and seam sealers as required for complete watertight installation; type as recommended by manufacturer for substrate and for applications indicated. 1. Manufacturers: a. GCP Applied Techologies (Grace). b. Henry Company. c. Carlisle Corp. d. Protecto Wrap Company. e. Substitutions: Refer to Section 01 25 00. 2. Provide specific membrane types as recommended by system manufacturers for each type of application. H. Concealed Metal Flashings Integral with Underlayment: Minimum 26 gage thick steel with minimum 0.90 oz/sf galvanized coating; ASTM A653. 1. Fasteners: Flat head round wire type of hot dipped galvanized steel; minimum 19/64" head diameter and 0.104" shank diameter; minimum 7/8" long. Coating over top of fasteners. I. Fluid Applied Flashing Coating. 322 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 28 00 - 4 Weather Barrier/Underlayment J. Accessories: Provide as recommended by underlayment manufacturers for specific applications. 1. Plastic Cement: Cutback asphaltic type with mineral fiber components, for sealing and coating flashings; free of toxic solvents and free of asbestos. Capable of setting within 24 hours at temperatures of approximately 75 degrees F and 50% R.H. 2.2 FLASHING FABRICATION A. Fabricate metal flashings as recommended by Sheet Metal and Air Conditioning Contractors National Association (SMACNA) "Sheet Metal Manual". B. Form flashings to drain water to exterior C. Form sections square, true and accurate to size, in maximum possible lengths and free from distortion and other defects detrimental to appearance or performance. D. Hem exposed edges of metal flashings minimum 1/4" on underside. PART 3 - EXECUTION 3.1 PREPARATION A. Coordinate installation with installation of components and items projecting through underlayment. 3.2 FLASHINGS INSTALLATION A. Install flashings as recommended by Sheet Metal and Air Conditioning Contractors National Association (SMACNA) "Sheet Metal Manual". B. Weatherlap joints minimum 2" and seal with plastic cement; secure in place. C. Fastenings: Concealed in completed installation. 3.3 UNDERLAYMENT INSTALLATION A. Install weather barrier/underlayment in accordance with installation instructions and recommendations of each manufacturer and of manufacturers of products to cover weather barrier/underlayment; comply with applicable code requirements. 1. Penetrations: Apply one-layer of self-adhering sheet membrane extending minimum 18" from penetrations, including windows and doors; start at bottom of penetration and weatherlap joints. a. Apply top layer over metal flashing to direct water to exterior. 2. Weatherlap joints as recommended by system manufacturer. END OF SECTION 323 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 1 Modified Bituminous Membrane Roofing SECTION 07 55 00 MODIFIED BITUMINOUS MEMBRANE ROOFING PART 1 GENERAL 1.1 SECTION INCLUDES A. Self-Adhered 2 Ply Roofing (StressPly SA FR Mineral). (2.15)(3.7) B. Accessories. (2.19) C. Edge Treatment and Roof Penetration Flashings. (2.20)(3.9) 1.2 SCOPE OF WORK A. Remove existing roofing and properly dispose in approved receptacles. Transport off site. B. Inspect substrate and walls for damage and report. C. Install Densdeck Prime and secure with the appropriate number and kind of screws and plates. D. Install roofing system as per the specifications, details, and documents. E. All vertical surface flashings are to be set in Greenlock Plus flashing adhesive. F. Seal all curb pan and ductwork with Keylock mastic and Garmesh in a three course application. G. Apply the Title 24 white Pyramic LO roof coating at 3gal/roofing square in a two-coat cross hatch pattern. H. New coping is to be installed. All seams and splice plates to be caulked utilizing Garland Tuff Stuff sealant. A new continuous cleat should be installed prior to coping placement. All fastening should be accomplished on the face of the coping. Fastening along the horizontal plane is discouraged and any fastening on the end laps should be accomplished with the use of closed end (watertight) rivets and sealed 1.3 REFERENCES A. ASTM D 41 - Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing. B. ASTM D 312 - Standard Specification for Asphalt used in Roofing. C. ASTM D 451 - Standard Test Method for Sieve Analysis of Granular Mineral Surfacing for Asphalt Roofing Products. D. ASTM D 1970 - Specification for Sheet Materials, Self-Adhering Polymer Modified Bituminous, Used as Steep Roofing Underlayment for Ice Dam Protection. E. ASTM D 1079 Standard Terminology Relating to Roofing, Waterproofing and Bituminous 324 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 2 Modified Bituminous Membrane Roofing Materials. F. ASTM D 1227 Standard Specification for Emulsified Asphalt Used as a Protective Coating for Roofing. G. ASTM D 1863 Standard Specification for Mineral Aggregate Used as a Protective Coating for Roofing. H. ASTM D 2178 Standard Specification for Asphalt Glass Felt Used in Roofing and Waterproofing. I. ASTM D 2824 Standard Specification for Aluminum-Pigmented Asphalt Roof Coating. J. ASTM D 4586 Standard Specification for Asphalt Roof Cement, Asbestos-Free. K. ASTM D 4601 Standard Specification for Asphalt Coated Glass Fiber Base Sheet Used in Roofing. L. ASTM D 5147 Standard Test Method for Sampling and Testing Modified Bituminous Sheet Materials. M. ASTM D 6162 Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using a Combination of Polyester and Glass Fiber Reinforcements. N. ASTM D 6163 Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Glass Fiber Reinforcements. O. ASTM D 6164 - Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Polyester Reinforcements. P. ASTM D 6754 - Standard Specification for Ketone Ethylene Ester (KEE) Sheet Roofing. Q. ASTM D 6757 - Standard Specification for Underlayment Felt Containing Inorganic Fibers Used in Steep-Slope Roofing. R. ASTM E 108 - Standard Test Methods for Fire Test of Roof Coverings S. Factory Mutual Research (FM): Roof Assembly Classifications. T. National Roofing Contractors Association (NRCA): Roofing and Waterproofing Manual. U. Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA) - Architectural Sheet Metal Manual. V. Underwriters Laboratories, Inc. (UL): Fire Hazard Classifications. W. Warnock Hersey (WH): Fire Hazard Classifications. X. ANSI-SPRI ES-1 Wind Design Standard for Edge Systems used with Low Slope Roofing Systems. Y. ASCE 7, Minimum Design Loads for Buildings and Other Structures Z. UL - Fire Resistance Directory. 325 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 3 Modified Bituminous Membrane Roofing AA. FM Approvals - Roof Coverings and/or RoofNav assembly database. BB. California Title 24 Energy Efficient Standards. 1.4 DESIGN / PERFORMANCE REQUIREMENTS A. Perform work in accordance with all federal, state and local codes. B. Exterior Fire Test Exposure: Roof system shall achieve a UL, FM or WH Class rating for roof slopes indicated on the Drawings as follows: 1. Factory Mutual Class A Rating. 2. Underwriters Laboratory Class A Rating. 3. Warnock Hersey Class A Rating. C. Design Requirements: 1. Uniform Wind Uplift Load Capacity a. Installed roof system shall withstand negative (uplift) design wind loading pressures complying with the following criteria. 1) Design Code: ASCE 7, Method 2 for Components and Cladding. D. Energy Star: Roof System shall comply with the initial and aged reflectivity required by the U.S. Federal Government's Energy Star program. E. membranes containing recycled or bio-based materials shall be third party certified through UL Environment. F. Roof system shall have been tested in compliance with the following codes and test requirements: 1. Miami-Dade County: a. Self-Adhered Membrane Systems Over: 1) Wood Decks N.O.A. b. Roofing Underlayments 1) Garland Underlayments N.O.A. c. Roofing Cements and Coatings 1) Garland Coatings and Mastics N.O.A. 2. Cool Roof Rating Council: a. CRRC Directory CRRC 3. Warnock Hersey a. ITS Directory of Listed Products 4. FM Approvals: a. RoofNav Website 1.5 SUBMITTALS A. Submit under provisions of Section 01 30 00. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation instructions. C. Shop Drawings: Submit shop drawings including installation details of roofing, flashing, fastening, insulation, and vapor barrier, including notation of roof slopes and fastening patterns of insulation and base modified bitumen membrane, prior to job start. 326 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 4 Modified Bituminous Membrane Roofing D. Design Pressure Calculations: Submit design pressure calculations for the roof area in accordance with ASCE 7 and local Building Code requirements. Include a roof system attachment analysis report, certifying the system's compliance with applicable wind load requirements before Work begins. E. Recycled or Bio-Based Materials: Provide third party certification through UL Environment of roof System membranes containing recycled or bio based materials. F. Verification Samples: For each modified bituminous membrane ply product specified, two samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns. G. Manufacturer's Certificates: Provide to certify products meet or exceed specified requirements. H. Test Reports: Submit test reports, prepared by an independent testing agency, for all modified bituminous sheet roofing, indicating compliance with ASTM D5147. Testing must be performed at 77 deg. F. Tests at 0 deg. F will not be considered. I. Closeout Submittals: Provide manufacturer's maintenance instructions that include recommendations for periodic inspection and maintenance of all completed roofing work. Provide product warranty executed by the manufacturer. Assist Owner in preparation and submittal of roof installation acceptance certification as may be necessary in connection with fire and extended coverage insurance on roofing and associated work. 1.6 QUALITY ASSURANCE A. Perform Work in accordance with NRCA Roofing and Waterproofing Manual. B. Manufacturer Qualifications: Company specializing in manufacturing products specified with documented ISO 9001 certification and minimum of twelve years of documented experience and must not have been in Chapter 11 bankruptcy during the last five years. C. Installer Qualifications: Company specializing in performing Work of this section with minimum five years documented experience and a certified Pre-Approved Garland Contractor. D. Installer's Field Supervision: Maintain a full-time Supervisor/Foreman on job site during all phases of roofing work while roofing work is in progress. E. Product Certification: Provide manufacturer's certification that materials are manufactured in the United States and conform to requirements specified herein, are chemically and physically compatible with each other, and are suitable for inclusion within the total roof system specified herein. F. Source Limitations: Obtain all components of roof system from a single manufacturer. Secondary products that are required shall be recommended and approved in writing by the roofing system Manufacturer. Upon request of the Architect or Owner, submit Manufacturer's written approval of secondary components in list form, signed by an authorized agent of the Manufacturer. 1.7 PRE-INSTALLATION MEETINGS A. Convene minimum two weeks prior to commencing Work of this section. 327 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 5 Modified Bituminous Membrane Roofing B. Review installation procedures and coordination required with related Work. C. Inspect and make notes of job conditions prior to installation: 1. Record minutes of the conference and provide copies to all parties present. 2. Identify all outstanding issues in writing designating the responsible party for follow-up action and the timetable for completion. 3. Installation of roofing system shall not begin until all outstanding issues are resolved to the satisfaction of the Architect. 1.8 DELIVERY, STORAGE, AND HANDLING A. Deliver and store products in manufacturer's unopened packaging with labels intact until ready for installation. B. Store all roofing materials in a dry place, on pallets or raised platforms, out of direct exposure to the elements until time of application. Store materials at least 4 inches above ground level and covered with "breathable" tarpaulins. C. Stored in accordance with the instructions of the manufacturer prior to their application or installation. Store roll goods on end on a clean flat surface except store KEE-Stone FB 60 rolls flat on a clean flat surface. No wet or damaged materials will be used in the application. D. Store at room temperature wherever possible, until immediately prior to installing the roll. During winter, store materials in a heated location with a 50-degree F (10 degree C) minimum temperature, removed only as needed for immediate use. Keep materials away from open flame or welding sparks. E. Avoid stockpiling of materials on roofs without first obtaining acceptance from the Architect/Engineer. F. Adhesive storage shall be between the range of above 50-degree F (10 degree C) and below 80 degree F (27 degree C). Area of storage shall be constructed for flammable storage. 1.9 COORDINATION A. Coordinate Work with installing associated metal flashings as work of this section proceeds. 1.10 PROJECT CONDITIONS A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits. 1.11 WARRANTY A. Upon completion of the work, provide the Manufacturer's written and signed NDL Warranty, warranting that, if a leak develops in the roof during the term of this warranty, due either to defective material or defective workmanship by the installing contractor, the manufacturer shall provide the Owner, at the Manufacturer's expense, with the labor and material necessary to return the defective area to a watertight condition. 1. Warranty Period: a. 25 + 5 years from date of acceptance. Requires mid period inspection. 328 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 6 Modified Bituminous Membrane Roofing B. Installer is to guarantee all work against defects in materials and workmanship for a period indicated following final acceptance of the Work. 1. Warranty Period: a. 5 years from date of acceptance. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturer: Garland Company, Inc. (The); 3800 E. 91st St., Cleveland, OH 44105. ASD. Toll Free: 800-321-9336. Phone: 216-641-7500. Fax: 216-641-0633. Web Site: www.garlandco.com. Regional Manager – Sean Gavin 661-343-3337. or pre-approved equal. B. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00. C. The Products specified are intended to be utilized and the Standard of Quality for the products required for this project. If other products are proposed, the bidder must submit those products no later than 10 business days prior to the bid date. If no manufacturer and products are listed, the bid may be accepted only with the use of products specified. 1. Bidder will not be allowed to change materials after the bid opening date. 2. If alternate products are to be used in the bid, the products must be equal to or exceed the products specified. Supporting technical data shall be submitted to the Architect/ Owner for approval at least 10 business days prior to acceptance. Any substitution request after that time will be rejected for non-compliance with the bid documents. 3. In making a request for substitution, the Bidder/Roofing Contractor represents that it has: a. Personally investigated the proposed product or method, and determined that it is equal or superior in all respects to that specified. b. Will provide the same guarantee for substitution as for the product and method specified. c. Will coordinate installation of accepted substitution in work, making such changes as may be required for work to be completed in all respects. d. Will waive all claims for additional cost related to substitution, which consequently become apparent. e. Cost data is complete and includes all related cost under his/her contract or other contracts, which may be affected by the substitution. f. Will reimburse the Owner for all redesign cost by the Architect for accommodation of the substitution. 4. Architect/ Owner reserves the right to be the final authority on the acceptance or rejection of any or all bids, proposed alternate roofing systems or materials that has met ALL specified requirement criteria. 5. Failure to submit substitution package, or any portion thereof requested 10 days prior to bid date, will result in immediate disqualification and consideration for that particular contractor’s request for manufacturer substitution. 2.2 SELF ADHERED ROOF SYSTEM A. Nailable Base Sheet: One ply fastened to the deck per wind uplift calculations. 1. HPR SA FR Base Sheet: 329 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 7 Modified Bituminous Membrane Roofing B. Base (Ply) Sheet: One ply bonded to the prepared substrate with self-adhesive. 1. HPR SA FR Base Sheet: C. Modified Cap (Ply) Sheet: One ply bonded to the prepared substrate with self-adhesive. 1. StressPly SA FR Mineral: D. Interply Adhesive: Use over approved cover boards or wood decks for base sheet only 1. SA Primer: E. Flashing Base Ply: One ply bonded to the prepared substrate. 1. HPR SA FR Base Sheet: F. Flashing Cap (Ply) Sheet: One ply bonded to the prepared substrate. 1. StressPly SA FR Mineral: G. Flashing Ply Adhesive: 1. GreenLock Plus Flashing Adhesive H. Surfacing: 1. Surface Coatings a. Pyramic Plus LO: 2.3 ACCESSORlES: A. Glass Fiber Cant - Glass Cant: Continuous triangular cross Section made of inorganic fibrous glass used as a cant strip as recommended and furnished by the membrane manufacturer. 2.4 EDGE TREATMENT AND ROOF PENETRATION FLASHINGS A. Vents and Breathers: Heavy gauge aluminum and fully insulated vent that allows moisture and air to escape but not enter the roof system as recommended and furnished by the membrane manufacturer. B. Drain Flashings should be Zinc or Aluminum. C. Plumbing stacks should be Zinc or Aluminum, or Tuff Flash liquid flashing system. D. Liquid Flashing - Tuff-Flash: An asphaltic-polyurethane, low odor, liquid flashing material designed for specialized details unable to be waterproofed with typical modified membrane flashings. 1. Tensile Strength, ASTM D 412: 400 psi 2. Elongation, ASTM D 412: 300% 3. Density @77 deg. F 8.5 lb/gal typical E. Fabricated Flashings: Fabricated flashings and trim are specified in Section 07620. 1. Fabricated flashings and trim shall conform to the detail requirements of SMACNA "Architectural Sheet Metal Manual" and/or the CDA Copper Development Association "Copper in Architecture - Handbook" as applicable. F. Manufactured Roof Specialties: Shop fabricated copings, fascia, gravel stops, control joints, expansion joints, joint covers and related flashings and trim are specified in Section 07710. 1. Manufactured roof specialties shall conform to the detail requirements of SMACNA "Architectural Sheet Metal Manual" and/or the NRCA "Roofing and Waterproofing 330 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 8 Modified Bituminous Membrane Roofing Manual" as applicable. PART 3 EXECUTION 3.1 EXAMINATION A. Do not begin installation until substrates have been properly prepared. B. Inspect and approve the deck condition, slopes and fastener backing if applicable, parapet walls, expansion joints, roof drains, stack vents, vent outlets, nailers and surfaces and elements. C. Verify that work penetrating the roof deck, or which may otherwise affect the roofing, has been properly completed. D. If substrate preparation and other conditions are the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding. 3.2 PREPARATION A. General: Clean surfaces thoroughly prior to installation. 1. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. 2. Fill substrate surface voids that are greater than 1/4 inch wide with an acceptable fill material. 3. Roof surface to receive roofing system shall be smooth, clean, free from loose gravel, dirt and debris, dry and structurally sound. 4. Wherever necessary, all surfaces to receive roofing materials shall be power broom and vacuumed to remove debris and loose matter prior to starting work. 5. Do not apply roofing during inclement weather. Do not apply roofing membrane to damp, frozen, dirty, or dusty surfaces. 6. Fasteners and plates for fastening components mechanically to the substrate shall provide a minimum pull-out capacity of 300 lbs. (136 k) per fastener. Base or ply sheets attached with cap nails require a minimum pullout capacity of 40 lb. per nail. 7. Prime decks where required, in accordance with requirements and recommendations of the primer and deck manufacturer. B. Wood Deck: 1. Plywood shall be a minimum 15/32 inch (11.9 mm) thick and conform to the standards and installation requirements of the American Plywood Association (APA). 2. provide a suitable dry sheathing paper, followed by an approved base sheet nailed appropriately for the specified roof system, with 1 inch (25 mm) diameter caps and annular nails unless otherwise required by the applicable Code or Approval agency. 3. In all retrofit roof applications, it is required that deck be inspected for defects. Any defects are to be corrected per the deck manufacturer's recommendations and standards of the APA/Engineered Wood Association prior to new roof application. 4. Insulation is to be mechanically attached in accordance with the insulation manufacturer’s requirements. 5. Light metal wall ties or other structural metal exposed on top of the wood deck shall be covered with one ply of a heavy roofing sheet, such as HPR Glasbase Base Sheet, extending 2 inches to 6 inches (51 mm to 152 mm) beyond the metal in all directions. Nail in place before applying the base ply. C. Deck Preparation for Self-Adhered Roof System: Insulation shall be mechanically installed. 331 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 9 Modified Bituminous Membrane Roofing Sweep or blow away any dust, dirt or sand particles that could interfere with adhesion to approved substrate Georgia Pacific (GP) DensDeck Prime, and prime with self-adhering primer at the specified coverage rate. 3.3 INSTALLATION - GENERAL A. Install modified bitumen membranes and flashings in accordance with manufacturer's instructions and with the recommendations provided by the National Roofing Contractors Association's Roofing & Waterproofing Manual, the Asphalt Roofing Manufacturers Association, and applicable codes. B. General: Avoid installation of modified bitumen membranes at temperatures lower than 40- 45 degrees F. When work at such temperatures unavoidable use the following precautions: 1. Take extra care during cold weather installation and when ambient temperatures are affected by wind or humidity, to ensure adequate bonding is achieved between the surfaces to be joined. Use extra care at material seam welds and where adhesion of the applied product to the appropriately prepared substrate as the substrate can be affected by such temperature constraints as well. 2. Unrolling of cold materials, under low ambient conditions must be avoided to prevent the likelihood of unnecessary stress cracking. Rolls must be at least 40 degrees F at the time of application. If the membrane roll becomes stiff or difficult to install, it must be replaced with roll from a heated storage area. C. Commence installation of the roofing system at the lowest point of the roof (or roof area), working up the slope toward the highest point. Lap sheets shingle fashion so as to constantly shed water D. All slopes greater than 2:12 require back-nailing to prevent slippage of the ply sheets. Use ring or spiral-shank 1 inch cap nails, or screws and plates at a rate of 1 fastener per ply (including the membrane) at each insulation stop. Place insulation stops at 16 ft o.c. for slopes less than 3:12 and 4 feet o.c. for slopes greater than 3:12. On non-insulated systems, nail each ply directly into the deck at the rate specified above. When slope exceeds 2:12, install all plies parallel to the slope (strapping) to facilitate backnailing. Install 4 additional fasteners at the upper edge of the membrane when strapping the plies. 3.4 INSTALLATION SELF ADHERED ROOF SYSTEM A. Optional Nailable Base Sheet: Install base sheet nailed to the substrate with the appropriate fastener and fastening pattern determined from your wind uplift calculation. B. Base Ply: Prior to installation sweep or blow away any dust, dirt, or sand particles, on the surface that could interfere with adhesion. 1. Prime the roof cover board at the recommended coverage rate with SA Primer at a rate of 0.50 gal per 100 sq.ft. Allow the primer to dry before installing the base sheet but it should be tacky for the base sheet application. 2. Start HPR SA FR Base Sheet application at the low point of the roof with appropriate roll width to offset side laps 18 inches (457 mm) from side laps of base sheet. Install flush to roof edge if over base sheet, otherwise turn the HPR SA FR Base Sheet over the fascia minimum 2 inches (50 mm) and nail 9 inches (230 mm) o.c. At perimeter flashing extend the HPR SA FR Base Sheet up a minimum of 8 inches (203 mm). Design so that side laps are against the flow of water. 3. Fold membrane back halfway lengthwise to remove the split release film. Press membrane securely into place and repeat with the opposite half of the membrane. 332 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 10 Modified Bituminous Membrane Roofing Use a heavy, weighted roller over entire surface of the HPR SA FR Base Sheet membrane to secure membrane. Work outwards to eliminate voids. When working with full rolls on large roofs, leave the membrane in position and remove the split release film from underneath the membrane. 4. Overlap side laps of subsequent HPR SA FR Base Sheet membrane lengths 4 inches (100 mm) and end laps 8 inches (203 mm). Offset (stagger) end laps minimum 3 feet (0.9 m). Cut end laps at opposing diagonal corners at a 45 degree angle approximately 3 inches (76 mm) from the corners to minimize "T"- seams. Apply a bead or small trowel dab (quarter size) of Flashing Bond or Garla-Flex at the edge of the angled cut to avoid a capillary. 5. Use of a hand-held hot air gun at joint area prior to rolling membrane to maximize adhesion. Apply a bead of Flashing Bond or Garla-Flex, at all HPR SA FR Base Sheet side and end laps to eliminate a capillary. 6. Use a heavy, weighted roller over the entire surface of HPR SA FR Base Sheet to secure it in place and prevent voids, working outward from center of sheet. 7. Repeat the above steps to properly build 1 to 2 plies, as specified, of HPR SA FR Base Sheet. 8. Don't leave the installed HPR SA FR Base Sheet exposed to the weather; cover with StressPly SA FR Mineral cap sheet the same day. C. Modified Cap Ply(s): Prior to installation sweep or blow away any dust, dirt, or sand particles, on the HPR SA FR Base Sheet that could interfere with adhesion. 1. Install StressPly SA FR Mineral starting at the low point of the roof with an appropriate roll width to offset sidelaps from the underlying membrane a minimum of 18 inches (457 mm). Work with manageable lengths for proper handling. Position with salvage edge release strip at high side of roof. Install in shingle fashion, with no laps against the flow of water. 2. Once positioned, lift and fold back lengthwise the lower half of the membrane, remove the split release film, and press firmly into place. Repeat with the other (high side of the roof) half of the membrane. Follow the same layout and split release film procedures as for HPR SA FR Base Sheet but overlap sidelaps 4 inches (100 mm) and endlaps 8 inches (203 mm). 3. Use a heavy, weighted roller over the entire surface of the StressPly SA FR Mineral sheet to secure it in place and prevent voids, working outward from the center of the sheet. 4. As subsequent membrane lengths are installed, remove the selvage edge release strip just prior to overlapping to keep the adhesive area protected and clean. Cut endlaps at opposing diagonal corners at a 45-degree angle approximately 4 inches (100 mm) from the corners to minimize "T" seams. Use Flashing Bond or Garla-Flex trowel grade, over the full 8-inch (200 mm) width of each end lap prior to overlapping. Apply a uniform 1/8 to 1/4 inch (3 to 6 mm) troweling of the Flashing Bond or Garla- Flex the full width of the endlaps to the underlying membrane; then install the overlapping sheet. 5. Always apply Flashing Bond or Garla-Flex the width of any overlap when applying the StressPly SA FR Mineral cap over another mineral surface such as the StressPly SA FR Mineral endlap. 6. Install HPR SA FR Base Sheet and StressPly SA FR Mineral at vertical and other flashing over the already installed StressPly SA FR Mineral field plies. D. Fibrous Cant Strips: Provide non-combustible perlite or glass fiber cant strips at all wall/curb detail treatments where angle changes are greater than 45 degrees. Cant may be set in approved cold adhesives in accordance with Garland's recommendations. 333 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 11 Modified Bituminous Membrane Roofing E. Wood Blocking, Nailers and Cant Strips: Provide wood blocking, nailers and cant strips as specified in Section 06114 and in accordance with Garland's recommendations. F. Metal Work: Provide metal flashings, counter flashings, parapet coping caps and thru-wall flashings as specified in Section 07620 or Section 07710. Install in accordance with in accordance with Garland's recommendations. G. Termination Bar: Provide metal termination bar or approved top edge securement at the terminus of all flashing sheets at walls and curbs. Fasten the bar a minimum of 8 inches (203 mm) o/c to achieve constant compression. Provide suitable, sealant at the top edge if required. H. Flashing Base Ply: At all vertical and other flashing details, install HPR SA FR Base Sheet and StressPly SA FR Mineral over the already installed StressPly SA FR Mineral field plies. 1. Prime the horizontal surface with SA Primer at a rate of 0.5 gal per 100 sq.ft. and allowed to dry. 2. Over installed StressPly SA FR Mineral field plies apply a 3 foot (0.9 m) wide HPR SA FR Base Sheet extending a minimum of 10 inches (254 mm) onto the field of the roof. Apply a uniform 1/8 to 1/4 inch (3 to 6 mm) thick troweling of Flashing Bond or Garla- Flex, on to the existing StressPly SA FR Mineral field cap. 3. If adhesion is not sufficient on the laps apply Flashing Bond or Garla-Flex at a 1/8 to 1/4 inch (3-6 mm) thick to fully seal laps before application of StressPly SA FR Mineral. 4. Before installing StressPly SA FR Mineral flashing ply to mineral surfaced field ply, apply Flashing Bond or Garla-Flex, wherever the membrane overlaps onto mineral surfacing. Proceed with StressPly SA FR Mineral cap sheet installation. Apply a 3 foot (0.9 m) wide StressPly SA FR mineral extending a minimum of 10 inches (254 mm) onto the field of the roof, being sure to cover the base ply. 5. Once the membrane has had a chance to bond, check all laps and joints for full adhesion. If the membrane can be lifted at any area it is not properly adhered. Use a seam probing tool to check for small voids at laps. If necessary, use appropriate hand- held hot air welding tool and seam roller to seal small un-bonded areas. I. Surface Coatings: Apply roof coatings in strict conformance with the manufacturer's recommended procedures. J. Flashing Cap Ply: Apply as specified for Flashing Base Ply in strict conformance with the manufacturer's recommended procedures. 3.5 INSTALLATION EDGE TREATMENT AND ROOF PENETRATION FLASHING A. Liquid Flashing: 1. Mask target area on roof membrane with tape. 2. Clean all non-porous areas with isopropyl alcohol. 3. Apply 32 wet mil base coat of liquid flashing over masked area. 4. Embed polyester reinforcement fabric into the base coat of the liquid flashing. 5. Apply 48-64 wet mil topcoat of the liquid flashing material over the fabric extending 2 inches (51 mm) past the scrim in all directions. 6. Apply minerals immediately or allow the liquid flashing material to cure 15-30 days and then install reflective coating. 3.6 CLEANING A. Clean-up and remove daily from the site all wrappings, empty containers, paper, loose 334 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 12 Modified Bituminous Membrane Roofing particles and other debris resulting from these operations. B. Remove asphalt markings from finished surfaces. C. Repair or replace defaced or disfigured finishes caused by Work of this section. 3.7 PROTECTION A. Provide traffic ways, erect barriers, fences, guards, rails, enclosures, chutes and the like to protect personnel, roofs and structures, vehicles and utilities. B. Protect exposed surfaces of finished walls with tarps to prevent damage. C. Plywood for traffic ways required for material movement over existing roofs shall be not less than 5/8 inch (16 mm) thick. D. In addition to the plywood listed above, an underlayment of minimum 1/2 inch (13 mm) recover board is required on new roofing. E. Special permission shall be obtained from the Manufacturer before any traffic shall be permitted over new roofing. 3.8 FIELD QUALITY CONTROL A. Inspection: Provide manufacturer's field observations at start-up and at intervals of Daily. Provide a final inspection upon completion of the Work. 1. Warranty shall be issued upon manufacturer's acceptance of the installation. 2. Field observations shall be performed by a Sales Representative employed full-time by the manufacturer and whose primary job description is to assist, inspect, and approve membrane installations for the manufacturer. 3. Provide observation reports from the Sales Representative indicating procedures followed, weather conditions and any discrepancies found during inspection. 4. Provide a final report from the Sales Representative, certifying that the roofing system has been satisfactorily installed according to the project specifications, approved details and good general roofing practice. 3.9 SCHEDULES A. Field Base Sheet: HPR SA FR Base Sheet: 80 mil SBS (Styrene-Butadiene-Styrene) self-adhered base sheet with a woven fiberglass scrim reinforcement. a. Tensile Strength, ASTM D 5147 1) 2 in/min. @73.4 +/- 3.6 deg. F MD 60 lbf/in XD 39 lbf/in 2) 50mm/min. @23 +/- 2 deg. C 10.5 kN/m XD 6.8 kN/m b. Tear Strength, ASTM D 5147 1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 100 lbf XD 95 lbf 2) 50mm/min. @ 23 +/- 2 deg. C 445 N XD 422.70 lbf c. Elongation at Maximum Tensile, ASTM D 5147) 1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 4% XD 4% 2) 50mm/min. @ 23 +/- 2 deg. C MD 4% XD 4% B. Field Cap Sheet: StressPly SA FR Mineral: 140 mil SBS (Styrene-Butadiene-Styrene) mineral surfaced self-adhered, rubber modified roofing membrane reinforced with a 335 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 13 Modified Bituminous Membrane Roofing fiberglass and polyester composite scrim. ASTM D 6162, Type III Grade G 1) Tensile Strength, ASTM D 5147 a) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 310 lbf/in XD 310 lbf/in b) 50 mm/min. @ 23 +/- 2 deg. C MD 54.25 kN/m XD 54.25 kN/m 2) Tear Strength, ASTM D 5147 a) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 500 lbf XD 500 lbf b) 50 mm/min. @ 23 +/- 2 deg. C MD 2224 N XD 2224 N 3) Elongation at Maximum Tensile, ASTM D 5147 a) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 3.5% XD 3.5% b) 50 mm/min. @ 23 +/- 2 deg. C MD 3.5% XD 3.5% 4) Low Temperature Flexibility, ASTM D 5147, Passes -15 deg. F (-26 deg. C. Flashing Base Sheet HPR SA FR Base Sheet: 80 mil SBS (Styrene-Butadiene-Styrene) self-adhered base sheet with a woven fiberglass scrim reinforcement. a. Tensile Strength, ASTM D 5147 1) 2 in/min. @73.4 +/- 3.6 deg. F MD 60 lbf/in XD 39 lbf/in 2) 50mm/min. @23 +/- 2 deg. C 10.5 kN/m XD 6.8 kN/m b. Tear Strength, ASTM D 5147 1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 100 lbf XD 95 lbf 2) 50mm/min. @ 23 +/- 2 deg. C 445 N XD 422.70 lbf c. Elongation at Maximum Tensile, ASTM D 5147) 1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 4% XD 4% 2) 50mm/min. @ 23 +/- 2 deg. C MD 4% XD 4% D. Flashing Cap Sheet: StressPly SA FR Mineral: 140 mil SBS (Styrene-Butadiene-Styrene) mineral surfaced self-adhered, rubber modified roofing membrane reinforced with a fiberglass and polyester composite scrim. ASTM D 6162, Type III Grade G 1) Tensile Strength, ASTM D 5147 a) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 310 lbf/in XD 310 lbf/in b) 50 mm/min. @ 23 +/- 2 deg. C MD 54.25 kN/m XD 54.25 kN/m 2) Tear Strength, ASTM D 5147 a) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 500 lbf XD 500 lbf b) 50 mm/min. @ 23 +/- 2 deg. C MD 2224 N XD 2224 N 3) Elongation at Maximum Tensile, ASTM D 5147 a) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 3.5% XD 3.5% b) 50 mm/min. @ 23 +/- 2 deg. C MD 3.5% XD 3.5% 4) Low Temperature Flexibility, ASTM D 5147, Passes -15 deg. F (-26 deg. C) E. Flashing Ply Adhesive: Green-Lock Plus Flashing Adhesive: Cold applied solvent free flashing adhesive: zero V.O.C. a. Non-Volatile Content ASTM D 4586 100% b. Density ASTM D 1475 11.8 lbs./gal. (1.17 g/cm3) c. Viscosity Brookfield 400,000 cPs. d. Flash Point ASTM D 93 400 deg. F min. (232 deg. C) F. Surfacing 336 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 07 55 00 - 14 Modified Bituminous Membrane Roofing Surface Coatings: a. Surfacing: 1) Pyramic Plus LO: White elastomeric roof coating, Energy Star approved acrylic roof coating: a) Weight/Gallon 11.7 lbs./gal. (1.40 g/cm3) b) Non-Volatile % (ASTM D 1644) 63 min c) Reflectance 83% END OF SECTION 337 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 60 00 - 1 Flashing and Sheet Metal SECTION 07 60 00 FLASHING AND SHEET METAL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide metal flashings and sheet metal including accessories as required for complete weathertight installation. 1. Flashing and sheet metal includes copings, fascias, scuppers, gutters, downspouts, rainwater leaders, reglets, and similar fabricated components as applicable to Project. 2. Provide concealed sealants used in conjunction with installation of metal flashing and sheet metal. 3. Provide miscellaneous sheet metal flashing and reglets. B. Related Sections: 1. Section 06 10 50: Miscellaneous rough carpentry. 2. Section 07 51 00 Built-Up Bituminous Roofing Cap Sheet 1.2 REFERENCES A. Sheet Metal and Air Conditioning Contractors National Association (SMACNA): Architectural Sheet Metal Manual. 1.3 SUBMITTALS A. Product Data: Furnish literature for manufactured products. B. Shop Drawings: Clearly indicate dimensioning, layout, general construction details including closures, flashings, locations and types of sealants, anchorages, and method of anchorage. C. Samples: Furnish samples of typical metal flashing fabrication indicating standard soldered joints and edge conditions. 1.4 QUALITY ASSURANCE A. Sustainability Requirements: 1) two years’ successful experience with CAL/Green requirements. 2. CALGreen Requirements: Refer to Section 01 35 15 – CALGreen Environmental Requirements and comply with applicable CALGreen Checklist indicating requirements applicable to Project. 338 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 60 00 - 2 Flashing and Sheet Metal 1.5 DELIVERY, STORAGE AND HANDLING A. Provide strippable film protective covering on shop finished flashing materials to protect materials through shipping, fabrication and installation. 1.6 WARRANTY A. Extended Correction Period: Provide for correcting failure of system to resist damage from anticipated sources including damage from wind and water penetration. Repair system and pay for or replace damaged materials and surfaces. 1. Period: Two years. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide flashing and sheet metal including reglets and accessories as required for complete weathertight installation. B. Design Criteria: Allow for movement of components without causing buckling, failure of joint seals, undue stress on fasteners or other detrimental effects, when subject to 100-year seasonal temperature ranges. C. Flashing and Sheet Metal: 1. Galvanized Steel: ASTM A924 and A653 G90 galvanized steel; minimum 24-gage. a. Mill phosphatized where indicated to be field painted. b. Location (Concealed): Where indicated, if not otherwise indicated, provide where flashing will not be exposed to view from exterior of building and where not exposed to view from spaces within building. 2. Shop Finished Galvanized Steel Flashing and Sheet Metal: ASTM A924 and A653 G90 galvanized steel; minimum 24-gage; with factory applied fluoropolymer coating based on Kynar 500 or Hylar 5000. a. Manufacturers: 1) Ryerson Building Products (800.328.7800)/ColorKlad. 2) Metal Sales Manuf. Corp.(800.406.7387)/PVDF (Kynar 500). 3) K&M Sheet Metal (888.567.7778)/Kynar Steel. 4) Substitutions: Refer to Section 01 25 00. b. Location (Exposed): Where indicated, if not otherwise indicated, provide where flashing will be exposed to view from exterior of building, and where exposed to view from spaces within building. 339 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 60 00 - 3 Flashing and Sheet Metal c. Colors: provide custom color as directed by Architect, to match existing building flashing colors (blue). Where not visible from public spaces, galvanized sheet metal may be used. d. Touch-up Paint for Prefinished Sheet Metal: Type recommended by fluoropolymer manufacturer for field touch-up. 3. Lead Flashing: ASTM B749, type L51121, copper-bearing sheet lead, minimum four pound per square foot (1/16" thick) lead with 6% to 7% antimony content. 4. Accessories: Provide strainers, outlet tubes, screens, baffles, hangers and gutter ends as required for a complete system and complying with SMACNA Manual. 5. Provide heavier gage metal where recommended by SMACNA Manual for size of component. D. Manufactured Reglets: Snap-on type, for two-piece flashing; metal to match flashing and sheet metal. 1. Manufacturers: a. Fry Reglet Corp./Springlok System. b. W.P. Hickman Co./The Leading-Edge Drive Lock System. c. Substitutions: Refer to Section 01 25 00. E. Solder and Fasteners: As recommended by SMACNA and complying with applicable codes and regulations; hot dipped galvanized minimum coating comparable to G90. F. Concealed Sealant: Butyl type for use in conjunction with sheet metal; non-staining; non-corrosive; non-shrinking and non-sagging; ultra-violet and ozone resistant for exterior concealed applications. G. Bituminous Paint: Acid and alkali resistant type; black color; asbestos free. H. Plastic Cement: Cutback asphaltic type; asbestos free. I. Sealing Compound: Type recommended by roofing manufacturer; asbestos free. J. Gaskets: Type suitable for use in conjunction with sheet metal; non-staining, non- corrosive, non-shrinking, non-sagging, ultra-violet resistant, and ozone resistant; for exterior concealed applications. 1. Manufacturers: a. Emseal USA, Inc./Emseal MST Multi-Use Sealant Tape. b. Substitutions: Refer to Section 01 25 00. 2.2 FABRICATION A. Fabricate sheet metal in accordance with SMACNA Architectural Sheet Metal Manual. 340 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 60 00 - 4 Flashing and Sheet Metal B. Form sections square, true and accurate to size, free from distortion and other defects detrimental to appearance or performance. 1. Fabricate corners and intersections in shop with solder joints; watertight fabrication. C. Form sections in maximum 10'-0" lengths; make allowance for expansion at joints. D. Hem exposed edges on underside 1/2". E. Back-paint flashings with heavy bodied bituminous paint where in contact with cementitious materials or dissimilar metals. F. Form pitch pans watertight, with minimum 4" upstand and 4" flanges; form pans minimum 6" wider than item passing through roof membrane. G. Form umbrella flashings with minimum 2" overhang, to shed water away from pitch pans. PART 3 - EXECUTION 3.1 INSTALLATION A. Install metal flashing and sheet metal in accordance with SMACNA Architectural Sheet Metal Manual. 1. Install tight in place, with corners square, surfaces true and straight in planes, and lines accurate to profiles as indicated on Drawings. 2. Lap joints in direction of water flow. 3. Hold downspouts in position, clear of wall, by hangers spaced not more than 10'-0" on center; securely fasten hangers to wall without exposed damage to wall surface. B. Exercise care when cutting materials on site, to ensure cuttings do not remain on finished surfaces. C. Provide expansion joints concealed within system. D. Use concealed fasteners, continuous cleat type, except where specifically approved by Architect. 1. Exposed fasteners may be used, where clearly indicated on shop drawings and approved by Architect, at areas not exposed at exterior walls nor in sight of interior spaces. E. Apply sealing compound at junction of metal flashing and felt flashing. F. Lock seams and end joints; fit flashing tight in place; make corners square, surfaces true and straight in planes, and lines accurate to profiles. 341 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 60 00 - 5 Flashing and Sheet Metal G. Counter-flash mechanical and electrical items projecting through roof membrane. H. Install sealants where required to prevent direct weather penetration. 1. Install continuous gasket behind surface applied reglets. I. Completed installation shall be free of rattles, noise due to thermal and air movement, and wind whistles. J. Install pitch pans and fill with plastic cement. K. Install umbrella flashing with draw band collars with sheet metal sealant between penetrating item and flashing; use wood blocking at angle type penetrations and cover blocking with sealant. 3.2 CLEANING A. Remove protective coating from shop finished sheet metal when no longer required to protect roofing and flashing from construction. B. Touch-up scratched and damaged finish to match new; remove and replace sheet metal units that cannot be repaired to look identical to adjacent sheet metal when viewed from 15'-0" away. END OF SECTION 342 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 07 72 00 - 1 Roof Hatches SECTION 07 72 00 ROOF HATCHES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide manufactured roof hatches with integral support curb, operable hardware, counterflashing, and accessories as required for complete, weather-tight installation. 1. Provide fall protection railings where indicated and as required by applicable regulations. B. Related Sections: 1. Section 05 50 00: Ladder extenders for roof hatch access. 2. Section 07 60 00: Flashing roof hatches to roof system. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer’s literature. B. Shop Drawings: Clearly indicate general construction, configurations, jointing methods and locations when applicable, fastening methods and general details. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Babcock-Davis Hatchways, Inc. B. Bilco Company. C. Milcor, Inc. D. Nystrom Building Products. E. Substitutions: Refer to Section 01 25 00. 2.2 ROOF HATCHES A. System Description: Provide manufactured roof hatches, with integral support curb, operable hardware, counterflashing, and accessories. B. Roof Hatches: 1. Type: Single leaf type. 2. Size: 3'-0" by 3'-0" unless otherwise indicated. 343 MOORPARK CITY HALL TENANT IMPROVEMENT 05/25/2023 MOORPARK, CALIFORNIA 07 72 00 - 2 Roof Hatches C. Construction: Construct with full welded corner joints, insulated hatch lids, and insulated internal support curbs. 1. Provide complete with integral counter-flashings to roof flashing system and flanges on support curb for anchorage to roof deck. 2. Loading: Capable of supporting minimum 40-psf external loading and 20-psf internal loading pressure. D. Opening Hardware: Manufacturer's standard manually operating type. 1. Capable of ensuring effortless control and smooth operation without causing damage to hatch or to roofing system. 2. Capable of being opened from inside and outside. 3. Complete with hold-open mechanism and inside padlock hasps. E. Fall Protection Integral Railings: Provide railings fixed to roof hatch curbs (not requiring additional penetration of roof assembly); comply with applicable code requirements; welded construction; cap exposed ends. 1. Railing Design Requirements: Comply with applicable codes and regulations requirements but not less than lateral force of 50 lbs. /lin. ft. uniform load and 200 lbs. at any single point without permanent set or damage; ASTM E935. 2. Rails: Seamless steel tube rails, 42" height above roof surface, 1-1/2" outside diameter, continuous railings conforming to applicable code and design requirements. 3. Chain Closures: Provide welded closed link chain capable of supporting same loads as railing and designed to allow easy removal for access from hatch to roof and roof to hatch. 2.3 FABRICATION A. Fabricate roof hatches weather-tight, and free of visual distortions and defects. PART 3 - EXECUTION 3.1 INSTALLATION A. Install roof hatches in accordance with manufacturer's recommendations and instructions for complete, weather-tight installation. B. Coordinate with installation of roofing system and related flashings. C. Apply bituminous paint on metal surfaces of roof hatches to be in contact with cementitious materials and dissimilar metals. END OF SECTION 344 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 84 00 - 1 Firestopping SECTION 07 84 00 FIRESTOPPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide firestopping as required to maintain effective barrier against spread of flame, smoke and gases, and to retain integrity of time-rated construction as indicated and at following types of locations. 1. Provide at fire rated system perimeters, and at duct, conduit, piping penetrations through time-rated construction, and as required by applicable codes. 2. Coordinate requirements for firestopping with work involving penetrations through fire rated assemblies. 3. Review Project and Contract Documents to ascertain extent of penetrations in fire rated assemblies and methods included in other sections for maintaining fire ratings. B. Related Sections: 1. Section 07 90 00: Non-fire rated joint sealants. 2. SECTION 21 05 03 - THROUGH PENETRATION FIRESTOPPING 3. SECTION 23 05 03 - THROUGH PENETRATION FIRESTOPPING 4. SECTION 26 05 03 - THROUGH PENETRATION FIRESTOPPING 1.2 ADMINISTRATIVE REQUIREMENTS A. Coordination: Coordinate firestopping with fire rated assemblies and penetrations through fire rated assemblies to ensure compliance with applicable codes and regulations to maintain integrity of fire rated assemblies. 1. Firestopping may be integral with some systems and may be specified as part of other systems including mechanical and electrical systems. B. Coordination with Acoustical Assemblies: Where a firestopping sealant is required at a penetration of an acoustical assembly, provide a fire-rated acoustical sealant such as Pecora/AC-20 FTR, or Hilti/CP 606. 1. Do not use intumescent firestopping at acoustically rated assemblies. 2. Coordinate with Section 09 21 00 – Gypsum Board Assemblies. 345 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 84 00 - 2 Firestopping 1.3 SUBMITTALS A. Product Data: Submit manufacturer's literature including data for materials and prefabricated devices, including descriptions to identify materials and devices on job. 1. Submit Underwriter's Laboratory approval numbers for required fire ratings; approval of other laboratories contingent upon acceptance of applicable authorities. 2. Deferred Approvals: Submit data necessary for applicable authorities for each type of firestopping required including firestopping at fire rated assembly junctures, and penetrations through fire rated assemblies. B. Shop Drawings: Submit manufacturer's installation details. C. Certificates of Compliance: Submit manufactures’ certificates, accompanied by classifications, indicating material or combination of materials used meets requirements specified for flame spread and fire resistance. 1. Certificates to be supported by test reports by nationally recognized testing authority or otherwise satisfactory to authorities. D. Manufacturer’s Instructions: Maintain copy of manufacturer's installation instructions and recommendations at each work area. 1.4 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements relative to finish material pollution control for sealants. 1.5 DELIVERY, STORAGE, AND HANDING A. Deliver materials in their original unopened packages and store in location providing protection from damage and exposure to elements. B. Damaged or deteriorated materials shall be removed from site. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. AD Fire Protection Systems/AD Firebarrier Firestopping Materials. B. Hilti, Corp./Hilti Firestop Systems. C. 3M Fire Protection Products Div./3M Fire Barrier Products. D. Specified Technologies, Inc. (STI)/SpecSeal and Pensil Firestopping. E. Tremco/Firestopping Products. F. Substitutions: Refer to Section 01 25 00. 346 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 84 00 - 3 Firestopping 2.2 MATERIALS A. System Description: Provide firestopping as required to maintain effective barrier against spread of flame, smoke and gases, and to retain integrity of time-rated construction. 1. Choose products and methods meeting applicable codes and Specification requirements for each firestopping application, subject to Architect's acceptance. B. Regulatory Requirements: Comply with California Building Code, Chapter 7 requirements for firestopping, including both F Ratings and T Ratings as applicable. C. Design Requirements: Provide materials tested in accordance with following standards, unless otherwise specified. 1. American Society for Testing and Materials (ASTM) Publications: a. ASTM E84, Surface Burning Characteristics of Building Materials. b. ASTM E119, Fire Tests of Building Construction and Materials. c. ASTM E814, Fire Tests of Through-Penetration Fire Stops. d. ASTM E1966, Test Method for Fire-Resistive Joint Systems. D. Firestopping Materials: Furnish materials for penetrations in time-rated floor, wall, and partition assemblies capable of preventing passage of flame, smoke, and hot gases. 1. Penetration Test: Furnish materials passing ASTM E814 or E1966 for penetration fire stopping indicating maintenance of time-rated adjacent assemblies. a. Additional Tests: Where required by applicable authorities, provide materials passing ASTM E119 time-temperature fire conditions for fire ratings indicated for assemblies. 2. Flame Spread: ASTM E84 flame spread rating of 25 or less. 3. Smoke Developed: ASTM E84 smoke developed rating of 450 or less. E. Firestopping: Maintain fire rating of assembly in which firestopping is installed, such as floor, partition, or wall, in accordance with ASTM E119 tests. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine surfaces and conditions receiving or affecting the work. Do not proceed until unsuitable conditions are corrected. 3.2 INSTALLATION A. Install firestopping in accordance with manufacturer's recommendations and installation instructions. B. Completely fill void space with firestopping materials regardless of geometric configuration, subject to tolerances established by firestopping manufacturer. 347 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 84 00 - 4 Firestopping C. Apply firestopping materials at penetrations of pipes, conduits, and ducts prior to application of insulation. 1. Remove insulation already in place at penetration prior to application of firestopping materials unless insulation meets requirements for fire ratings indicated. 3.3 FIELD QUALITY CONTROL A. Inspection: Keep area of work available for inspection by Architect and applicable authorities before and after application of firestopping. 3.4 REPAIR AND CLEAN-UP A. Repair damage caused by work of this section; clean exposed surfaces soiled by work and leave work ready to receive following work. B. On completion of work, remove debris, excess materials, and equipment from site. END OF SECTION 348 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 90 00 - 1 Joint Sealants SECTION 07 90 00 JOINT SEALANTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide joint sealants, for interior and exterior joints not specified elsewhere, with backing rods and accessories as required for complete installation. 1. Joint sealants include joint sealers and calking as indicated. B. Related Sections: 1. Section 07 60 00: Flashing and sheet metal concealed sealants. 2. Section 07 84 00: Firestopping type joint sealants. 3. Section 08 80 00: Glazing sealants. 4. Section 09 21 00: Sealants used for acoustical treatment at gypsum board. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer's descriptive literature. B. Samples: Furnish samples of each type of exposed joint sealer in required colors. C. Certifications: 1. Furnish manufacturer's certification joint sealers comply with Contract Documents and are suitable for Project applications. 2. Furnish certification indicating installers are trained in proper use of specified products, qualified, and familiar with proper installation techniques. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks. 1. Provide joint sealants as required by applicable codes and regulations to fill joints and openings in building envelope separating conditioned space from unconditioned space. B. Installer Qualifications: Firm with minimum five years successful experience on projects of similar type and size, using specified products. C. Installers shall be familiar with proper application procedures to ensure maximum joint sealer expansion and contraction capabilities. D. Mock-Up: Provide exterior joint sealers where required for mock-ups of other systems. 349 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 90 00 - 2 Joint Sealants 1.4 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration period for use, cure time, and mixing instructions. 1.5 SITE CONDITIONS A. Do not proceed with installation of joint sealers under unfavorable weather conditions. B. Install elastomeric sealants when temperature is in lower third of temperature range recommended by manufacturer. 1.6 WARRANTY A. Extended Correction Period: Extend correction period to two years. 1. Repair or replace joint sealers which fail to perform as intended, because of leaking, crumbling, hardening, shrinkage, bleeding, sagging, staining, loss of adhesion, and loss of cohesion. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide joint sealants with backing rods and accessories. B. Performance Requirements: 1. Select materials for compatibility with joint surfaces and indicated exposures. 2. Where not indicated, select modulus of elasticity and hardness or grade recommended by manufacturer for each application indicated. 3. Comply with applicable limitations on volatile organic compound (VOC) emissions. C. Regulatory Requirements: Comply with applicable regulatory requirements regarding limitations on volatile organic compound (VOC) emissions limitations. D. Elastomeric Sealants: 1. Multi-Component Polyurethane Sealant: ASTM C920, Type M, Grade P, Class 25, self-leveling; minimum 25% expansion and compaction capability. a. Provide at traffic bearing locations. b. Manufacturers: 1) Pecora Corp./Urexpan NR-200, or Dynatrol II-SG. 2) Tremco/THC 900-901, or Vulkem 445 SSL. 3) BASF/MasterSeal SL 2 4) Substitutions: Refer to Section 01 25 00. 350 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 90 00 - 3 Joint Sealants 2. Mildew-Resistant Silicone Rubber Sealant: ASTM C920, Type S, Grade NS, Class 25, compounded with fungicide, specifically for mildew resistance and recommended for interior joints in wet areas. a. Provide at interior joints in damp areas. b. Manufacturers: 1) GE (Momentive Performance Materials)/SCS 1702 Sanitary Sealant. 2) Dow Corning Corp./786 Bathtub Caulk. 3) Pecora Corp./898 Sanitary Mildew Resistant Sealant. 4) Tremco/Tremsil 200. 5) Substitutions: Refer to Section 01 25 00. E. Non-Elastomeric Sealants: 1. Acrylic-Emulsion Sealant: ASTM C834 acrylic or latex-rubber-modified acrylic sealant, permanently flexible, non-staining and non-bleeding; recommended for general interior exposure; compatible with paints specified in Section 09 90 00. a. Provide at general interior applications. b. Manufacturers: 1) Pecora Corp./AC-20. 2) Tremco/Tremflex 834. 3) Substitutions: Refer to Section 01 25 00. 2. Air Seals: Provide non-staining and non-bleeding sealers, calks, or foams appropriate to specific applications for filling openings between conditioned and unconditioned spaces. a. Type: As recommended by manufacturer for each specific application; compatible with adjacent materials. b. Manufacturers: 1) Dow/Great Stuff. 2) Owens Corning/EnergyComplete Air Sealant. 3) Hilti/Foam Filler CF 812. 4) Substitutions: Refer to Section 01 25 00. c. Pest Control Mesh: Openings subject to pest infiltration to have 304 stainless steel wool, material stuffed in joint before application of air seals using methods to ensure blocking of gap from pests. d. Exception: Annular spaces around pipes, electric cables, conduits and other openings in exterior walls shall be protected against passage of rodents by closing with cementitious grout. 351 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 90 00 - 4 Joint Sealants 1) Cementitious Grout: ASTM C1107 non-shrink, non-metallic, pre-mixed, factory-packaged, non-staining, non-corrosive; type specifically recommended by manufacturer as applicable to job condition. F. Miscellaneous Materials: 1. Primers/Sealers: Non-staining types recommended by joint sealer manufacturer for joint surfaces to be primed or sealed. 2. Joint Cleaners: Non-corrosive types recommended by joint sealer manufacturer; compatible with joint forming materials. 3. Bond Breaker Tape: Polyethylene tape as recommended by joint sealer manufacturer where bond to substrate or joint filler must be avoided for proper performance of joint sealer. 4. Sealant Backer Rod: Compressible polyethylene foam rod or other flexible, permanent, durable non-absorptive material as recommended by joint sealer manufacturer for compatibility with joint sealer. a. Oversize backer rod minimum 30% to 50% of joint opening. G. Colors: As indicated, as selected by Architect from manufacturer's full range of colors where not indicated. 1. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. PART 3 - EXECUTION 3.1 PREPARATION A. Prepare joint surfaces in accordance with ASTM C1193 and as recommended by joint sealer manufacturer. B. Clean joint surfaces immediately before installation of joint sealer; remove dirt, insecure materials, moisture and other substances which could interfere with bond of joint sealer. C. Prime or seal joint surfaces where recommended by joint sealer manufacturer; do not allow primer/sealer to spill or migrate onto adjoining surfaces. D. Ensure protective coatings on surfaces in contact with joint sealers have been completely stripped. 3.2 INSTALLATION A. Comply with manufacturer's printed instructions and ASTM C1193, except where more stringent requirements are shown or specified. 352 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 07 90 00 - 5 Joint Sealants B. Pest Control: Install stainless steel wool prior to application of backer rods and bond breakers at air seal and as required to ensure complete pest blockage at joints where pest intrusion is a potential. C. Set sealant backer rods at proper depth or position in joint to coordinate with other work, including installation of bond breakers and sealant; do not leave voids or gaps between ends of backer rods. 1. Do not stretch, twist, puncture or tear backer rods. D. Install bond breaker tape as required to avoid three-sided bond of sealant to substrate and where required by manufacturer's recommendations to ensure joint sealers will perform properly. E. Size materials to achieve required width/depth ratios. F. Employ installation techniques that will ensure joint sealers are deposited in uniform, continuous ribbons without gaps or air pockets, with complete "wetting" of bond surfaces equally on opposite sides. G. Joint Configuration: Fill sealant joint to a slightly concave surface, slightly below adjoining surfaces, unless otherwise indicated. H. Where horizontal joints are between a horizontal surface and vertical surface, fill joint to form a slight cove, so that joint will not trap moisture or dirt. I. Install joint sealers to depths recommended by joint sealer manufacturer but within the following general limitations, measured at center (thin) section of bead. 1. Horizontal Joints: 75% width with minimum depth of 3/8". 2. Elastomeric Joints: 50% width with minimum depth of 1/4". 3. Non-Elastomeric Joints: 75% to 125% of joint width. J. Spillage: Do not allow sealants or compounds to overflow or spill onto adjoining surfaces, or to migrate into voids of adjoining surfaces. 1. Clean adjoining surfaces by whatever means may be necessary to eliminate evidence of spillage. K. Cure joint sealers in compliance with manufacturer's instructions and recommendations to obtain high early bond strength, internal cohesive strength and surface durability. L. Maintain finished joints free of embedded matter, ridges and sags. END OF SECTION 353 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 08 11 10 - 1 Hollow Metal Doors and Frames SECTION 08 11 10 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide full flush steel (hollow metal) doors and pressed steel frames, including anchors and silencers. 1. Pressed steel frames include both door and window framing. B. Related Sections: 1. Section 08 11 20 Interior Aluminum Frames 2. Section 08 71 00: Door hardware. 3. Section 08 80 00: Glazing. 1.2 REFERENCES A. Steel Door Institute (SDI): SDI-100 (ANSI/SDI A250.8) - Recommended Specifications - Standard Steel Doors and Frames. B. National Association of Architectural Metal Manuf. (NAAMM): Hollow Metal Manual. C. Underwriters Laboratories: Standards as applicable to fire rated doors and frames. 1. Materials tested, labeled and inspected by Warnock Hersey International are acceptable upon approval of authorities. 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination: 1. Coordinate hardware installation with Section 08 71 00 – Door Hardware. 2. Coordinate glass installation with Section 08 80 00 - Glazing. 1.4 SUBMITTALS A. Product Data: Submit manufacturers' literature. B. Shop Drawings: Indicate general construction, configuration, jointing methods, reinforcement, anchorage methods, hardware locations, and locations of cut-outs. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Amweld Building Products Inc. 354 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 08 11 10 - 2 Hollow Metal Doors and Frames B. Ceco Door Division Assa Abloy Door Group. C. Curries Division Assa Abloy Door Group. D. Door Components, Inc. E. Republic Doors and Frames. F. Krieger Steel Products Co. G. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide full flush steel (hollow metal) doors and pressed steel frames, including anchors and silencers. B. Doors: Hollow metal flush steel door, 1-3/4" thick. 1. Typical: Full flush with steel channel or welded edge; close top with flush end closer treatment, bottom optional flush or recessed channel; steel stiffened core, insulated at exterior doors; continuous welded seam. 2. Interior Doors: Minimum 0.042” (18-gage). 3. Exterior Doors: Minimum 0.053” (16-gage). 4. Glazed Doors: Provide as indicated on Drawings. C. Frames: 1. Exterior Frames: Welded (pre-assembled) type. 2. Interior Frames: Knockdown (field-assembled) type; provide 3/8” back bend return on frames at gypsum board. 3. Gage: Minimum 0.053” (16-gage) interior frames, 0.067” (14-gage) exterior frames. 4. Door Silencers: Manufacturer's standard resilient type; removable for replacement. 5. Mortar Guard Boxes: Minimum 0.026” (22-gage) mortar guard boxes welded in place; provide where frames may be grouted. D. Glazing Stops: Full flush type with glass centered in opening, unsecured side integral with unit, secured side fastened with flush, countersunk Allen type fasteners; minimum 0.053” (16-gage). 355 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 08 11 10 - 3 Hollow Metal Doors and Frames E. Fire Rated Units: Construct in accordance with requirements for fire rating, NFPA 252 or UL 10C, and NFPA 80. 1. Labels: Place fire rating labels where visible when doors and frames are in installed, opened position. 2. Fire Ratings: Refer to Drawings for fire rating requirements. 2.3 FABRICATION A. Conform to requirements of SDI (ANSI A250 Series) or NAAMM. B. Reinforce and prepare doors and frames to receive hardware. 1. Refer to Section 08 71 00 for hardware requirements. C. Frames: 1. Welded Frames: Accurately form and cut mitered corners of welded type frames; continuously weld on inside surfaces (fully welded); grind welded joints to smooth uniform finish. 2. Knocked Down Frames: Accurately form and miter interlocking joints of knocked down frames to maintain hairline alignment of parts when field assembled. 3. Head Reinforcement: Reinforce frames wider than 4'-0" with minimum 0.093” (12 gage) formed steel channels welded in place, flush with top of frames. 4. Doors at Glazed Panels: Reinforce jambs and heads of frames for doors which occur adjacent to glazed sidelights and partitions. D. Door Silencers: 1. Place three single bumpers on single door frames; space equally along strike jambs. 2. Place two single bumpers on double door frames; place on frame heads. 3. Place three single bumpers for each door on door frames with removable mullions, spaced equally along strike jambs, and in addition place two single bumpers on frame heads to cushion door when mullion is removed. E. Provide jamb anchors per SDI-100 (ANSI/SDI 250.8) and NAAMM; weld floor jamb anchors in place. F. Edge Clearances: 1. Between Doors and Frames: Maximum 1/8" at head and jambs. 2. Door Sills (No Threshold): Maximum 1/2". 3. Door Sills (Threshold): Maximum 3/8" above finished floor. 4. Between Edges of Pairs of Doors: Maximum 1/8". 356 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 08 11 10 - 4 Hollow Metal Doors and Frames 5. Fire Rated Doors: As required for fire ratings. G. Finish: Comply with requirements of Section 09 90 00 – Painting and Coating for primer including application and compatibility with specified finishes. 1. Interior Units: Prime paint. 2. Exterior Exposed Units: Apply minimum A60 non-spangle galvanized coating, ASTM A924 and A653. a. Surface treat after galvanizing to remove oils and prepare for painting and apply one coat of primer; comply with requirements in Section 09 90 00. PART 3 - EXECUTION 3.1 INSTALLATION A. Install doors and frames in accordance with SDI-100 (ANSI/SDI A250.8) and ANSI/SDI A250.11 or NAAMM "Hollow Metal Manual" and with manufacturer's recommendations and installation instructions. 1. Install fire rated units in conformance with fire label requirements and NFPA 80. B. Install doors and frames plumb and square within 1/16”, and with maximum diagonal distortion of 1/32". C. Remove and replace new doors and frames damaged during delivery, storage, installation and construction at contractor’s expense. 1. Paste filler repair shall not be permitted. D. After installation, touch-up scratched paint surfaces. END OF SECTION 357 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 08 11 20 - 1 Interior Aluminum Frames SECTION 08 11 20 INTERIOR ALUMINUM FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide aluminum frames for interior doors and glazed partitions, with attachments and accessories as required for complete installation. 1. Prepare frames for door hardware. B. Related Work: 1. Section 08 41 00: Aluminum-framed entrances and storefronts. 2. Section 08 71 00: Door hardware. 3. Section 08 80 00: Glazing. 1.2 REFERENCES A. Underwriters Laboratories Inc. (UL): Building Materials Directory. 1. Materials tested, labeled and inspected by Warnock Hersey International are acceptable upon approval of authorities. B. National Association of Architectural Metal Manuf. (NAAMM): Metal Finishes Manual. 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination: 1. Coordinate hardware installation with Section 08 71 00 - Door Hardware. 2. Coordinate glass installation with Section 08 80 00 - Glazing. 1.4 SUBMITTALS A. Product Data: Submit manufacturer's literature. B. Shop Drawings: Indicate pertinent dimensioning, general construction, component connections and locations, anchor methods and locations. C. Samples: Submit samples of aluminum finish. 358 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 08 11 20 - 2 Interior Aluminum Frames PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Wilson Partitions. B. Western Integrated Materials, Inc. C. RACO Interior Products. D. Arcadia E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide aluminum frames for interior doors and glazed partitions, with attachments and accessories. B. Interior Aluminum Frames: Knock-down (field assembled) door frames; extruded aluminum, ASTM B221, 6063-T5 alloy; profile as indicated. 1. Glazed Partition Frames: Provide extruded aluminum security type snap-in glass stops. 2. Fire Rated Frames: Provide fire rated frames as indicated, approved by California State Fire Marshal and ICBO. 3. Door Stop Gasketing: Provide continuous elastomeric vinyl gasketing at door stop. C. Fluoropolymer Finish: Fluorocarbon polymer based on Kynar 500 or Hylar 5000. 1. Colors: Metallic Silver to match existing door frames. 2.3 FABRICATION A. Fabricate aluminum frames to allow for clearances and shim spacing around perimeter; provide for thermal movement. B. Provide anchorage devices to securely and rigidly fit frames in place. 1. Conceal anchorage devices and fasteners. C. Accurately fit together joints and corners; match components ensuring continuity of line and design; ensure joints and connections are flush, hairline and weatherproof. D. Provide required internal reinforcing for door hardware. 1. Refer to Section 08 71 00 for hardware requirements. E. Apply coat of bituminous paint on concealed aluminum surfaces to be in contact with cementitious or dissimilar materials. 359 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 08 11 20 - 3 Interior Aluminum Frames PART 3 - EXECUTION 3.1 INSTALLATION A. Install aluminum frames in accordance with recommendations of manufacturer. 1. Install fire rated units in conformance with fire label requirements and NFPA 80. B. Ensure assemblies are plumb, level and free of warp or twist; maintain dimensional tolerances and alignment with adjacent work. C. Use anchorage devices to securely and rigidly fasten frame assemblies to building. D. After installation, touch-up scratched and damaged surfaces; remove and replace damaged frames where touch-up is noticeable from 5’-0” or more at expense of the contractor. END OF SECTION 360 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 14 00 - 1 Wood Doors SECTION 08 14 00 WOOD DOORS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide flush wood doors as indicated. 1. Contractor Option: Provide shop finished wood doors. B. Related Work 1. Section 08 11 10 Hollow Metal Doors and Frames 2. Section 08 11 20: Interior aluminum frames. 3. Section 08 71 00: Door hardware. 4. Section 08 80 00: Glass and glazing for wood doors. 1.2 REFERENCES A. North American Architectural Woodwork Standards – 3.1, (NAAWS). B. Window and Door Manufacturer’s Association (WDMA): Guide Specifications. C. Underwriters Laboratories Inc. (UL): Building Materials Directory. 1. Materials tested, labeled and inspected by Warnock Hersey International are acceptable upon approval of authorities. 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination: 1. Hardware: Coordinate hardware installation with Section 08 71 00 – Door Hardware. 2. Glazing: Coordinate glazing with Section 08 80 00 – Glazing. 3. Painting: Coordinate with Section 09 90 00 – Painting and Coating whether wood doors are to be shop or field finished. 4. Coordinate with Millwork for (3) millwork gate locations. 1.4 SUBMITTALS A. Product Data: Submit manufacturer's literature. B. Shop Drawings: Indicate general construction, jointing methods, hardware locations, and locations of cut-outs. 361 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 14 00 - 2 Wood Doors C. Samples: Submit samples of wood doors indicating construction, veneering, and finish. 1. Submit shop finish for wood doors where doors are furnished shop finished. D. Certificates: Submit manufacturer certification indicating compliance to applicable requirements of either NAAWS or WDMA Standards; note which standards were followed or if both standards have been met. 1. Wood Product Certification: Furnish certification indicating wood products are from FSC “well-managed” forests. 1.5 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for composite wood products formaldehyde limitations and paints and coatings. B. Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC). 1.6 SITE CONDITIONS A. Do not deliver or install doors until conditions for temperature and relative humidity have been stabilized in accordance with referenced standards requirements applicable to Project location. 1.7 WARRANTY A. Extended Correction Period: Provide for replacing, rehanging, and refinishing wood doors exhibiting defects in materials or workmanship including warp and delamination. 1. Period: Two years. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Algoma Hardwoods, Inc. B. Eggers Industries Architectural Door Division. C. Marshfield Door Systems, Inc. D. VT Industries. Basis of Design E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide flush wood doors as indicated. 362 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 14 00 - 3 Wood Doors B. Solid Core Flush Wood Doors: NAAWS/Premium Grade, 5 Ply Hot Press, 1-3/4" thick solid wood framed glued block construction or particleboard core five ply construction; Contractor option to use WDMA comparable standards. 1. Transparent/Stained Wood Veneers: NAAWS/Premium Grade veneers for transparent/stained finish; nominal 1/40" thick before sanding, not less than 1/50” after sanding. a. Wood Veneers: 1) Cherry a) Stain: WH 18 Wheat at Interior face of Council Chamber doors and new doors not directly connected to lobby. b) Stain: T1 18 at lobby side of council chamber doors And other new doors. (1) Verify in field to match existing doors. Submit samples for approval. 2) Walnut: Dais Gates (2): Walnut veneer a) Wheat Stain (WH18) 2. Edges: Stile edges to match face veneer, minimum 1-1/8" thick after trim. 3. Core: Bond stiles and rails to core and sand prior to assembly of face veneers. 4. Bond Type: Provide Type I Bond for exterior doors, Type II Bond for interior doors. 5. Bond Type: Provide Type II Bond for interior doors. 6. Fire Rated Flush Wood Doors: 1-3/4" thick, match non-rated door appearance; comply with applicable codes; UL or Warnock Hersey rated. a. Labels: Place fire rating labels where visible when doors are installed, in opened position. b. Fire Ratings: Refer to Drawings for fire rating requirements. c. Core: Use wood core construction for 20 minute rated flush doors, mineral core permitted for longer ratings. 363 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 14 00 - 4 Wood Doors 2.3 FABRICATION A. Fabricate doors in accordance with requirements of specified standards. 1. Prefit wood doors. 2. Prepare doors to receive hardware in shop, refer to Section 08 71 00 for hardware requirements and templates. 3. Factory machine doors for mortise hardware. B. Bevel strike edge of single-acting doors, 1/8" in 2". 1. Radius strike edge of double-acting swing doors 2-1/8". C. Fire Rated Doors: Fabricate fire rated doors in accordance with requirements of Underwriters' Laboratories (UL) or Warnock Hersey International. 1. Provide fire rated doors with maximum allowable edge strips, of wood species to match face veneers. 2. Provide doors with blocking designed for addition of closers, even where doors are not indicated to receive closers. 3. Provide astragals and metal edge trim for double doors. D. Make cut-outs and provide matching wood stops for glass; profiles as indicated, type as selected by Architect where not otherwise indicated. 1. Fire Rated Doors: Provide minimum 18-gage metal stops conforming to fire rating requirements. E. Shop Finished Doors (Contractor Option): Conform to requirements specified in Section 09 90 00 – Painting and Coating. 1. Colors: Per finish plans and or door schedule. PART 3 - EXECUTION 3.1 INSTALLATION A. Install wood doors in accordance with manufacturer's recommendations and installation instructions, and reference standards, plumb and square, and with maximum diagonal distortion of 1/16". 1. Install fire rated wood doors in accordance with requirements for specified fire label and requirements of NFPA 80. a. Field cutting of fire rated doors shall not be acceptable. B. Rehang or replace doors which do not swing or operate freely. 364 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 14 00 - 5 Wood Doors 3.2 PROTECTION A. Protection: Protect doors as recommended by door manufacturer to ensure doors are without damage at time of Substantial Completion. 1. Shop Finished Doors: Refinish or replace damaged doors. END OF SECTION 365 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 31 00 - 1 Access Doors and Panels SECTION 08 31 00 ACCESS DOORS AND PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide access doors set in finished surfaces. 1. Provide access doors and panels as required for access to controls and valves behind finished surfaces. 2. Coordinate with various trades for controls and valves which may be concealed. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer's literature. B. Shop Drawings: Indicate locations of access doors required but not indicated on Architectural Drawings. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Milcor Inc. B. Karp Associates, Inc. C. J.L. Industries. D. Nystrom Building Products. E. Elmdor Manufacturing Co. F. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide access doors and panels set in finished surfaces. B. Regulatory Requirements: Where doors and panels are in fire rated assemblies provide assemblies listed in Underwriters Laboratories, Inc. "Classified Building Materials Index" for rating shown. 1. Provide UL label on each rated access door. 2. Materials tested, labeled and inspected by Warnock Hersey International are acceptable upon approval of authorities. 366 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 31 00 - 2 Access Doors and Panels C. Access Doors and Panels: Provide access door and panel assemblies consisting of an integral unit with flush metal doors and panels, complete and ready for installation. 1. Fire Rated Units: Match Milcor/Model UFR Universal flush panel fire rated doors. 2. Wall Units: Match Milcor/Style M flush panel style; prime painted unless otherwise indicated. Stainless steel at restroom locations. 3. Units Mounted in Plaster: Match MIlcor/Style K, flush panel style. 4. Gypsum Board Ceilings: Match Milcor/Style ATR recessed panel style to receive gypsum board insert with edges filled and taped. Council Chamber only. D. Frames: Fabricate from not less than 16-gage steel. E. Doors: Flush panel type, fabricate from not less than 14-gage steel. F. Hinges: Provide continuous piano type hinge. G. Locking Devices: Provide flush, key-operated cylinder lock for each access door; provide two keys per lock and key locks alike, unless otherwise scheduled. H. Finish: Finish with manufacturer's factory-applied enamel prime coat applied over phosphate coating on steel. 1. Stainless Steel: provide Type 304 corrosion resistant nonmagnetic stainless-steel access doors and frames. 2.3 FABRICATION A. Size Variations: Obtain Architect's acceptance of manufacturer's standard size units which may vary slightly from sizes shown or scheduled. B. Fabricate units of continuous welded steel construction; grind welds smooth and flush with adjacent surfaces. C. Provide attachment devices and fasteners of type required for specific job conditions. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas and conditions under which access doors are to be installed. 1. Do not proceed with work until unsatisfactory conditions are corrected; installation signifies acceptance of conditions. B. Obtain specific locations and sizes for required access doors from trades requiring access to concealed equipment; coordinate installation with work of other trades. 367 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 31 00 - 3 Access Doors and Panels 3.2 INSTALLATION A. Comply with manufacturer's installation instructions for access doors. 1. Install fire rated access doors in accordance applicable code requirements and with requirements of NFPA 80. B. Set frames accurately in position and securely attach to supports with face panels plumb or level in relation to adjacent finish surfaces. C. Adjust hardware and doors after installation for proper operation. 3.3 PROTECTION A. Remove and replace doors and frames that are warped, bowed, or otherwise damaged at contractor’s expense. END OF SECTION 368 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 1 Entrances & Storefronts SECTION 08 41 00 ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide aluminum-framed entrances and storefront systems, with stock non-automatic doors, hardware, anchorage, glazing, and accessories as required for complete installation. B. Related Sections: 1. Section 07 90 00: Perimeter sealants and back-up materials. 2. Section 08 71 00 Door Hardware 3. Section 08 80 00 Glazing 1.2 REFERENCES A. American Architectural Metal Manufacturers (AAMA): Aluminum Store Front and Entrance Manual. B. Glass Association of North America (GANA): Glazing Manual. C. National Association of Architectural Metal Manuf. (NAAMM): Metal Finishes Manual. 1.3 ADMINISTRATIVE REQUIREMENTS 1.4 SUBMITTALS A. Product Data: Submit manufacturer's literature. B. Shop Drawings: Indicate pertinent dimensioning, general construction, component connections and locations, anchor methods and locations, hardware locations, and relevant details. C. Samples: Furnish samples of metal finish, glass and glazing gasket. 1.5 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to energy efficiency. B. Installer Qualifications: Manufacturer or firm with minimum five years successful experience in the installation of systems similar to type and size required for Project and approved by manufacturer. 369 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 2 Entrances & Storefronts 1.6 WARRANTY A. Extended Correction Period: Provide for correcting failures including wind damage and water penetration to interior surfaces, excessive deflections, and deterioration of finishes, weather-stripping and accessories. 1. Period: Two years. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Kawneer, an Arconic Company. B. Oldcastle Building Envelope. C. Arcadia, Inc. D. EFCO Corporation. E. TRACO. F. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide aluminum-framed entrances and storefront systems, with stock non-automatic doors, hardware, anchorage, glazing, and accessories. B. Regulatory Requirements, General: Comply with requirements of applicable codes. 1. Safety Glass Standard: Comply with applicable codes and CPSC 16 CFR 1201 and pass ANSI Z97.1. C. Regulatory Requirements, California Energy Code: Comply with California Energy Commission requirements regarding energy performance of aluminum framed storefronts. 1. Manufacturer shall be responsible for providing information required by authorities necessary to verify conformance. 2. Entire assembly, including glass and glazing, shall be certified by the National Fenestration Rating Council (NFRC) and shall bear NFRC Label indicating energy performance technical information. D. Regulatory Requirements, Accessibility: Comply with requirements of California Building Code and Americans with Disabilities Act (ADA) Standards to ensure access to persons with disabilities. 370 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 3 Entrances & Storefronts E. Design Criteria: Comply with recommendations of AAMA Aluminum Store Front and Entrance Manual except where more stringent requirements are specified. 1. Deflection: Maximum L/175, ASTM E330. a. Safety Factor: Design for specified pressures with no glass breakage, no permanent damage to fasteners, and no permanent deformation of framing in excess of 0.2% of member clear span. 2. Water Penetration: No uncontrolled water penetration, ASTM E331, with no water on exposed interior components; static pressure differential of 20% of inward wind load, with minimum 6-psf load. 3. Air Leakage: Maximum 0.06 cfm/sf, ASTM E283, at differential static pressure of 6.24-psf at fixed glazing and not more than 0.3 cfm/sf at doors. F. Performance Criteria: Design assemblies capable of withstanding minimum uniform test pressures as required by applicable codes when tested in accordance with ASTM E330. G. Aluminum-Framed Entrance and Storefront Systems: Systems with profiles as indicated on Drawings; provide extruded aluminum security type glass stops of profile to suit frame design. 1. Aluminum Type: As recommended by manufacturer for application indicated, but not less than extruded aluminum, ASTM B221, 6061 or 6063 alloy and T5 or T6 temper. 2. Finish, High Performance Organic Coating: AA-C12C42R1x, prepared, pretreated, and coated with minimum two coat Kynar 500 or Hylar 5000 system; AAMA 2605. a. Color: Blue to match existing adjacent conditions, custom color as selected by Architect from manufacturer’s full line of colors (non-metallic), H. Doors, Frames, and Hardware: Barrier-free entry doors meeting code requirements for providing access for people with physical disabilities; by entrance manufacturer. 1. Type: Medium stile, nominal 3-1/2” wide stiles and head rail with 10" bottom rail. 2. Metal and Finish: Match entrance system. 3. Hardware: Provide complete hardware system except as indicated; match window wall system finish unless otherwise directed by Architect. Coordinate with Section 08 71 00 – Door Hardware. a. Pivots/Closers: Center-hung pivots with concealed adjustable type closer, maximum 5-pound operating pressure when installed in final application. b. Hinges: Extra heavy-duty ball bearing full mortise (butt) hinges complying with requirements specified in Section 08 71 00. 371 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 4 Entrances & Storefronts c. Closers: Concealed adjustable type closer, maximum 5-pound operating pressure when installed in final application. d. Push/Pulls: Types as indicated on Drawings; where not otherwise indicated manufacturer's standard types as selected by Architect; match finish of similar hardware as specified in Section 08 71 00. e. Security Locks: Manufacturer's standard. 1) Cylinders: Provided under Section 08 71 00. f. Weather-Stripping, Sweep Strips: Manufacturer's recommended standard type, to suit application. g. Thresholds: Maximum 1/2" height above adjacent surfaces, with maximum 1/4" vertical section and remainder maximum 1:2 slope. I. Glass: Provide minimum thicknesses specified, but no less than thicknesses required based on window size and configuration and anticipated wind loading. 1. Manufacturers: a. Vitro Architectural Glass (formerly PPG). b. Oldcastle Glass. c. Guardian Industries Corp. d. Viracon. e. Substitutions: Refer to Section 01 25 00. 2. Float Glass: Select glazing quality, clear float glass, ASTM C1036; nominal thickness 1/4". 3. Tempered Glass: Select glazing quality, clear float glass, fully tempered, ASTM C1048; nominal thickness 1/4"; safety glass. 4. Tinted Glass: Manufacturer's standard tint as directed by Architect. a. Use one thickness of tinted glass throughout unless otherwise indicated or approved in advance by Architect. 5. Insulated Glass: Preassembled units consisting of organically sealed panes of glass enclosing a hermetically sealed dehydrated air space with minus 20-degree F dew point. a. Performance: Certified to ASTM E2190 by Insulating Glass Certification Council. b. System: Manufacturer's standard dual seal system compatible with glazing system, and including spacers, desiccant, and standard corner construction. c. Glass: 372 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 5 Entrances & Storefronts 1) Float Glass (Typical): Select glazing quality, clear float glass, ASTM C1036; nominal thickness 1/4". 2) Tempered Glass (Where Indicated and Where Safety Glazing is Required): Select glazing quality, clear float glass, fully tempered, ASTM C1048, Kind FT; nominal thickness 1/4"; safety glass. 3) Low Emissivity Coating: Provide high performance low e coating, not less than Vitro (PPG)/SolarBan 60, on Number 2 surface. 4) Tinted Glass: As indicated, where not otherwise indicated manufacturer's standard tint as directed by Architect. 5) Use one thickness of tinted glass throughout unless otherwise indicated or approved in advance by Architect. 6) Spandrel Glass: Double density ceramic frit, heat strengthened spandrel glass, ASTM C1048, Kind HS; nominal 1/4" thickness. d. Total Unit Thickness: 1". J. Glazing Accessories: Of type recommended by manufacturer to suit security locations and applications for dry glazing installation. 1. Setting Blocks: Neoprene or EPDM, 80-90 Shore A durometer hardness; 4" long by 3/8" thick by 1/4" high; ASTM C864. 2. Spacer Shims: Neoprene or EDPM; 45-55 Shore A durometer hardness; 3" long by 3/32" thick by 1/4" high; ASTM C864. 3. Edge Blocks: Neoprene or EPDM, 60-70 Shore A durometer hardness; 4" long with minimum two per jamb located at top and bottom edges of glass; ASTM C864. 4. Glazing Gaskets: Exterior neoprene or EDPM; interior neoprene, EPDM or vinyl; miter corner joints; ASTM C509 or C864. K. Miscellaneous Materials: 1. Fasteners: Aluminum or non-magnetic stainless steel of type which will not cause electrolytic action or corrosion. a. Do not use exposed fasteners except where unavoidable for assembly or for application of hardware. b. Indicate exposed fasteners on shop drawings for specific approval; exposed fasteners shall be Phillips flat-head screws or Allen screws with finish matching item fastened. c. Provide concealed fasteners for glazing stops. 373 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 6 Entrances & Storefronts 2. Steel Reinforcement and Brackets: Manufacturer's standard with minimum 2 oz. hot-dip zinc coating, ASTM A123, applied after fabrication. 3. Bituminous Paint: Cold-applied mastic, SSPC Paint 12, compounded for 30 mil thickness per coat. 4. Flashing: Provide sub-sill flashing members; minimum 22 gage sheet aluminum of sizes and shapes indicated and as required to drain water to exterior; match adjacent aluminum member finish. 5. Anchoring Devices: Corrosion resistant type capable of supporting entrance system and superimposed design loads; design to allow adjustments of system prior to being permanently fastened in place. 2.3 FABRICATION A. Fabricate aluminum entrance and storefront system to allow for clearances and shim spacing around perimeter of assemblies to enable installation; provide for thermal movement. B. Provide anchorage devices to securely and rigidly fit entrance assemblies in place. C. Non-Automatic Doors: Comply with California Building Code and Americans with Disabilities Act (ADA) Standards relating to access for persons with disabilities. 1. Clear Opening Width: Minimum 32" clear opening width for each door. D. Accurately fit together joints and corners; match components ensuring continuity of line and design; ensure joints and connections are flush, hairline and weatherproof. E. Provide structural reinforcing within framing members where required to maintain rigidity and as required to accommodate design loads. F. Allow moisture entering joints and condensation occurring within frame construction to drain to exterior. G. Complete cutting, fitting, forming, drilling and grinding of metal work prior to cleaning, finishing, treatment, and application of coating. H. Finishing: After fabrication, prepare surfaces for finishing in accordance with recommendations of aluminum producer and finish manufacturer. 1. Finish components of each assembly simultaneously to attain uniformity of color. I. Weld by methods recommended by metal manufacturer and AWS; grind exposed welds smooth and restore mechanical finish; remove arises from cut edges and corners to a radius of approximately 1/64". J. Fit and assemble work at shop to greatest extent possible; disassemble only as required for shipment and erection. 374 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 7 Entrances & Storefronts K. Reinforce work as necessary for performance requirements and for support. L. Provide internal reinforcing for hardware. M. Separate dissimilar materials with bituminous paint or preformed separators which will prevent corrosion. N. Separate metal surfaces at moving joints with plastic inserts or other non-abrasive concealed inserts which permanently prevent "freeze-up" of joint. O. Fabricate doors and apply hardware in shop. Disassemble only as required for transportation and installation. P. Apply coat of bituminous paint on concealed aluminum surfaces to be in contact with cementitious and with dissimilar materials. PART 3 - EXECUTION 3.1 INSTALLATION A. Install aluminum framed storefront assemblies, including entrances, in accordance with manufacturer's recommendations and installation instructions and to meet design criteria and performance criteria indicated, for weather-tight installation. 1. Separate aluminum and other corrodible metal surfaces from sources of corrosion or electrolytic action at points of contact with other materials. B. Ensure assemblies are plumb, level and free of warp or twist; maintain dimensional tolerances and alignment with adjacent work. 1. Maximum Variation from Plane or Location: 1/8" in 12'-0", with maximum 1/2" variation in total length. 2. Maximum Offset Between Members: 1/16". C. Use sufficient anchorage devices to securely and rigidly fasten assemblies to building. D. Install hardware in accordance with manufacturer's recommendations, using proper templates. 1. Install doors to operate freely and smoothly, with a maximum operating pressure of 5 pounds in accordance with California Building Standards Code. 2. Coordinate installation of cylinders with Section 08 71 00 – Door Hardware. 3. Install sill members and thresholds in bed of compound, joint fillers or gaskets to provide weathertight construction. 375 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 41 00 - 8 Entrances & Storefronts E. Glass Installation: Comply with GANA Glazing Manual and glazing manufacturer instructions. 1. Do not allow glass to touch metal surfaces. 3.2 CLEANING A. Clean aluminum surfaces promptly after installation of components, exercising care to avoid damage of finish. B. Mark glass after installation by crossed streamers attached to framing and held away from glass; do not apply markers to surface of glass. C. Remove nonpermanent labels immediately after sealant cures; cure sealants for high early strength and durability. 3.3 PROTECTION A. Remove and replace glass which is broken, chipped, cracked, abraded or damaged during construction period, including natural causes, accidents and vandalism. END OF SECTION 376 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 1 DOOR HARDWARE SECTION 08 71 00 DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes commercial door hardware for the following: 1. Swinging Passage doors. 2. Interior Passage Gates 3. Other doors to the extent indicated. B. Door hardware includes, but is not necessarily limited to, the following: 1. Mechanical door hardware. 2. Electromechanical door hardware. 3. Cylinders specified for doors in other sections. C. Related Sections: 1. 08 11 10 Hollow Metal Doors and Frames 2. 08 11 20 Interior Aluminum Frames 3. 08 14 00 Wood Doors - Flush 4. 08 31 00 Access Doors and Panels 5. 08 41 00 Entrances and Storefronts D. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction. 1. ANSI A117.1 - Accessible and Usable Buildings and Facilities. 2. ICC/IBC - International Building Code. 3. CBC – California Building Code 4. NFPA 70 - National Electrical Code. 5. NFPA 80 - Fire Doors and Windows. 6. NFPA 101 - Life Safety Code. 7. NFPA 105 - Installation of Smoke Door Assemblies. 8. State Building Codes, Local Amendments. 377 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 2 DOOR HARDWARE E. Standards: All hardware specified herein shall comply with the following industry standards as applicable. Any undated reference to a standard shall be interpreted as referring to the latest edition of that standard: 1. ANSI/BHMA Certified Product Standards - A156 Series. 2. UL10C – Positive Pressure Fire Tests of Door Assemblies. 3. CAN/ULC-S104 – Standard Method for Fire Tests of Door Assemblies. 4. ANSI/UL 294 – Access Control System Units. 5. ULC-S319 - Electronic Access Control Systems. 6. ULC-60839-11-1, Alarm and Electronic Security Systems - Part 11-1: Electronic Access Control Systems - System and Components Requirements. 7. CAN-ULC-S132 -- Standard Method of Tests for Emergency Exit and Emergency Fire Exit Hardware. 8. CAN-ULC-S533 - Egress Door Securing and Releasing Devices. 9. UL 305 – Panic Hardware. 10. ULC-S132, Emergency Exit and Emergency Fire Exit Hardware. 11. ULC-S533 – Egress Door Securing and Releasing Devices. 12. ANSI/UL 437- Key Locks. 13. ULC-S328, - Burglary Resistant Key Locks. F. Registrations: All hardware specified herein shall be registered with the following agencies, as applicable: 1. Federal Communications Commission (FCC). 2. California State Fire Marshall. 1.3 SUBMITTALS A. Product Data: Manufacturer's product data sheets including installation details, material descriptions, dimensions of individual components and profiles, operational descriptions and finishes. B. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication and assembly of door hardware, as well as procedures and diagrams. Coordinate the final Door Hardware Schedule with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware. 1. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and Format for the Hardware Schedule." 2. Organization: Organize the Door Hardware Schedule into door hardware sets indicating complete designations of every item required for each door or opening. Organize door hardware sets in same order as in the Door Hardware Sets at the end of Part 3. Submittals that do not follow the same format and order as the Door Hardware Sets will be rejected and subject to resubmission. 3. Content: Include the following information: 378 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 3 DOOR HARDWARE a. Type, style, function, size, label, hand, and finish of each door hardware item. b. Manufacturer of each item. c. Fastenings and other pertinent information. d. Location of door hardware set, cross-referenced to Drawings, both on floor plans and in door and frame schedule. e. Explanation of abbreviations, symbols, and codes contained in schedule. f. Mounting locations for door hardware. g. Door and frame sizes and materials. h. Warranty information for each product. 4. Submittal Sequence: Submit the final Door Hardware Schedule at earliest possible date, particularly where approval of the Door Hardware Schedule must precede fabrication of other work that is critical in the Project construction schedule. Include Product Data, Samples, Shop Drawings of other work affected by door hardware, and other information essential to the coordinated review of the Door Hardware Schedule. C. Shop Drawings: Details of electrified access control hardware indicating the following: 1. Wiring Diagrams: Upon receipt of approved schedules, submit detailed system wiring diagrams for power, signaling, monitoring, communication, and control of the access control system electrified hardware. Differentiate between manufacturer-installed and field-installed wiring. Include the following: a. Elevation diagram of each unique access controlled opening showing location and interconnection of major system components with respect to their placement in the respective door openings. b. Complete (risers, point-to-point) access control system block wiring diagrams. c. Wiring instructions for each electronic component scheduled herein. 2. Electrical Coordination: Coordinate with related sections the voltages and wiring details required at electrically controlled and operated hardware openings. D. Keying Schedule: After a keying meeting with the owner has taken place prepare a separate keying schedule detailing final instructions. Submit the keying schedule and reference plan in electronic format. Include keying system explanation, door numbers, key set symbols, hardware set numbers and special instructions. Owner must approve submitted keying schedule prior to the ordering of permanent cylinders/cores. E. Proof of Compliance: (California located Projects): Provide a list of product(s) containing chemicals known to cause cancer or reproductive toxicity as defined by the Office of Environmental Health Hazard Assessment (OEHHA) under Proposition 65 (CA Code of Regulations, Title 27, Section 27001). The list includes the specific chemical(s), if the chemical will be exposed to consumers, the means of warning, and an illustration of the label. F. Informational Submittals: 379 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 4 DOOR HARDWARE 1. Product Test Reports: Indicating compliance with cycle testing requirements, based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified independent testing agency. G. Operating and Maintenance Manuals: Provide manufacturers operating and maintenance manuals for each item comprising the complete door hardware installation in quantity as required in Division 01, Closeout Procedures. 1.4 QUALITY ASSURANCE A. Manufacturers Qualifications: Engage qualified manufacturers with a minimum 5 years of documented experience in producing hardware and equipment similar to that indicated for this Project and that have a proven record of successful in-service performance. B. Certified Products: Where specified, products must maintain a current listing in the Builders Hardware Manufacturers Association (BHMA) Certified Products Directory (CPD). C. Installer Qualifications: A minimum 3 years documented experience installing both standard and electrified door hardware similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. D. Door Hardware Supplier Qualifications: Experienced commercial door hardware distributors with a minimum 5 years documented experience supplying both mechanical and electromechanical hardware installations comparable in material, design, and extent to that indicated for this Project. Supplier recognized as a factory direct distributor by the manufacturers of the primary materials with a warehousing facility in Project's vicinity. Supplier to have on staff a certified Architectural Hardware Consultant (AHC) available during the course of the Work to consult with Contractor, Architect, and Owner concerning both standard and electromechanical door hardware and keying. E. Source Limitations: Obtain each type and variety of door hardware specified in this section from a single source unless otherwise indicated. 1. Electrified modifications or enhancements made to a source manufacturer's product line by a secondary or third party source will not be accepted. 2. Provide electromechanical door hardware from the same manufacturer as mechanical door hardware, unless otherwise indicated. F. California Building Code: Provide hardware that complies with CBC Section 11B. 1. All openings as a part of an accessible route shall comply with CBC Section 11B- 404. 380 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 5 DOOR HARDWARE 2. The clear opening width for a door shall be 32” minimum. For a swinging door it shall be measured between the face of the door and the stop, with the door open 90 degrees. There shall be no projections into it below 34” and 4” maximum projections into it between 34” and 80” above the finish floor or ground. Door closers and stops shall be permitted to be 78” minimum above the finish floor or ground. CBC Section 11B-404.2.3. 3. Operable hardware on accessible doors shall comply with CBC Section 11B- 309.4 and shall be operable with one hand and shall not require tight grasping, pinching, or twisting of the wrist. Operable parts of such hardware shall be 34” minimum and 44” maximum above finish floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides. 4. Hardware (including panic hardware) shall not be provided with “nightlatch” function for any accessible doors or gates unless the following conditions are met: a. Such hardware has a ‘dogging’ feature and is dogged during the time the facility is open. b. All ‘dogging’ operation is performed only by employees as their job function (non-public use). 5. The force for pushing or pulling open a door shall be in accordance with CBC Section 11B-404.2.9. a. Interior hinged doors, sliding or folding doors, and exterior hinged doors: 5 pounds (22.2 N) maximum. Required fire doors: the minimum opening force allowable by the DSA authority, not to exceed 15 pounds (66.7N). These forces do not apply to the force required to retract latch bolts or disengage other devices that hold the door in a closed position. b. The force required for activating any operable parts, such as lever hardware, or disengaging other devices shall be 5 pounds (22.2N) maximum to comply with CBC Section 11B-309.4. c. The 5 pound (22.2 N) maximum force shall be validated for the size of the door used. The Building Materials Listing of the California State Fire Marshal shall indicate that the door hardware meets the 5 pound (22.2 N) force and shall also list the largest door that can be used. 6. Door closing speed shall comply with CBC Section 11B-404.2.8. Closers shall be adjusted so that the required time to move a door from an open position of 90 degrees to a position of 12 degrees from the latch is 5 seconds minimum. Spring hinges shall be adjusted so that the required time to move a door from an open position of 70 degrees to the closed position is 1.5 seconds minimum. 7. Floor stops shall not be located in the path of travel and 4” maximum from walls. 8. Thresholds shall comply with CBC Section 11B-404.2.5. 381 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 6 DOOR HARDWARE G. Each unit to bear third party permanent label demonstrating compliance with the referenced standards. H. Keying Conference: Conduct conference to comply with requirements in Division 01 Section 01 31 00 Project Management and Coordination. Keying conference to incorporate the following criteria into the final keying schedule document: 1. Function of building, purpose of each area and degree of security required. 2. Plans for existing and future key system expansion. 3. Requirements for key control storage and software. 4. Installation of permanent keys, cylinder cores and software. 5. Address and requirements for delivery of keys. I. Pre-Submittal Conference: Conduct coordination conference in compliance with requirements in 01 31 00 Project Management and Coordination with attendance by representatives of Supplier(s), Installer(s), and Contractor(s) to review proper methods and the procedures for receiving, handling, and installing door hardware. 1. Prior to installation of door hardware, conduct a project specific training meeting to instruct the installing contractors' personnel on the proper installation and adjustment of their respective products. Product training to be attended by installers of door hardware (including electromechanical hardware) for aluminum, hollow metal and wood doors. Training will include the use of installation manuals, hardware schedules, templates and physical product samples as required. 2. Inspect and discuss electrical roughing-in, power supply connections, and other preparatory work performed by other trades. 3. Review sequence of operation narratives for each unique access controlled opening. 4. Review and finalize construction schedule and verify availability of materials. 5. Review the required inspecting, testing, commissioning, and demonstration procedures J. At completion of installation, provide written documentation that components were applied to manufacturer's instructions and recommendations and according to approved schedule. 1.5 DELIVERY, STORAGE, AND HANDLING A. Inventory door hardware on receipt and provide secure lock-up and shelving for door hardware delivered to Project site. Do not store electronic access control hardware, software or accessories at Project site without prior authorization. B. Tag each item or package separately with identification related to the final Door Hardware Schedule, and include basic installation instructions with each item or package. C. Deliver, as applicable, permanent keys, cylinders, cores, access control credentials, software and related accessories directly to Owner via registered mail or overnight 382 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 7 DOOR HARDWARE package service. Instructions for delivery to the Owner shall be established at the "Keying Conference". 1.6 COORDINATION A. Templates: Obtain and distribute to the parties involved templates for doors, frames, and other work specified to be factory prepared for installing standard and electrified hardware. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing hardware to comply with indicated requirements. B. Door and Frame Preparation: Doors and corresponding frames are to be prepared, reinforced and pre-wired (if applicable) to receive the installation of the specified electrified, monitoring, signaling and access control system hardware without additional in-field modifications. 1.7 WARRANTY A. General Warranty: Reference Division 01, General Requirements. Special warranties specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents. B. Warranty Period: Written warranty, executed by manufacturer(s), agreeing to repair or replace components of standard and electrified door hardware that fails in materials or workmanship within specified warranty period after final acceptance by the Owner. Failures include, but are not limited to, the following: 1. Structural failures including excessive deflection, cracking, or breakage. 2. Faulty operation of the hardware. 3. Deterioration of metals, metal finishes, and other materials beyond normal weathering. 4. Electrical component defects and failures within the systems operation. C. Standard Warranty Period: One year from date of Notice of Completion, unless otherwise indicated. D. Special Warranty Periods: 1. Closers: 30 years for surface, 15 years for concealed. 2. Automatic Operators: 2 years. 3. Exit Devices: 2 years for mechanical, 1 year for electrified. 4. Mortise Locksets: 3 years for mechanical, 1 year for electrified. 5. Cylindrical Locksets: 10 years for mechanical, 1 year for electrified. 383 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 8 DOOR HARDWARE 1.8 MAINTENANCE SERVICE A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware. PART 2 - PRODUCTS 2.1 SCHEDULED DOOR HARDWARE A. General: Provide door hardware for each door to comply with requirements in Door Hardware Sets and each referenced section that products are to be supplied under. B. Designations: Requirements for quantity, item, size, finish or color, grade, function, and other distinctive qualities of each type of door hardware are indicated in the Door Hardware Sets at the end of Part 3. Products are identified by using door hardware designations, as follows: 1. Named Manufacturer's Products: Product designation and manufacturer are listed for each door hardware type required for the purpose of establishing requirements. Manufacturers' names are abbreviated in the Door Hardware Schedule. C. Substitutions: Requests for substitution and product approval for inclusive mechanical and electromechanical door hardware in compliance with the specifications must be submitted in writing and in accordance with the procedures and time frames outlined in Division 01, Substitution Procedures. Approval of requests is at the discretion of the architect, owner, and their designated consultants. 2.2 HANGING DEVICES A. Hinges: ANSI/BHMA A156.1 certified butt hinges with number of hinge knuckles and other options as specified in the Door Hardware Sets. 1. Quantity: Provide the following hinge quantity: a. Two Hinges: For doors with heights up to 60 inches. b. Three Hinges: For doors with heights 61 to 90 inches. c. Four Hinges: For doors with heights 91 to 120 inches. d. For doors with heights more than 120 inches, provide 4 hinges, plus 1 hinge for every 30 inches of door height greater than 120 inches. 2. Hinge Size: Provide the following, unless otherwise indicated, with hinge widths sized for door thickness and clearances required: a. Widths up to 3’0”: 4-1/2” standard or heavy weight as specified. b. Sizes from 3’1” to 4’0”: 5” standard or heavy weight as specified. 384 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 9 DOOR HARDWARE 3. Hinge Weight and Base Material: Unless otherwise indicated, provide the following: a. Exterior Doors: Heavy weight, non-ferrous, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate standard weight. b. Interior Doors: Standard weight, steel, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate heavy weight. 4. Hinge Options: Comply with the following: a. Non-removable Pins: Provide set screw in hinge barrel that, when tightened into a groove in hinge pin, prevents removal of pin while door is closed; for the all out-swinging lockable doors. 5. Scheduled Manufacturer and Product: Ives 5BB Series. 2.3 PIVOT SETS: A. Requirements: 1. Provide pivot sets complete with oil-impregnated top pivot, unless indicated otherwise. 2. Where offset pivots are specified, Provide one intermediate pivot for doors less than 91 inches (2311 mm) high and one additional intermediate pivot per leaf for each additional 30 inches (762 mm) in height or fraction thereof. Intermediate pivots spaced equally not less than 25 inches (635 mm) or not more than 35 inches (889 mm) on center, for doors over 121 inches (3073 mm) high. 3. Provide appropriate model where pivot sets are scheduled at fire rated openings. 4. Scheduled Manufacturer and Product: Ives. 2.4 FLUSH BOLTS A. Requirements: 1. Provide automatic, constant latching, and manual flush bolts with forged bronze or stainless steel face plates, extruded brass levers, and with wrought brass guides and strikes. Provide 12 inch (305 mm) steel or brass rods at doors up to 90 inches (2286 mm) in height. For doors over 90 inches (2286 mm) in height increase top rods by 6 inches (152 mm) for each additional 6 inches (152 mm) of door height. Provide dust-proof strikes at each bottom flush bolt. 2. Scheduled Manufacturer and Product: Ives. 385 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 10 DOOR HARDWARE 2.5 MORTISE LOCKS A. Requirements: 1. Provide mortise locks conforming to ANSI/BHMA A156.13 Series 1000, Grade 1 Operational, Grade 1 Security, and manufactured from heavy gauge steel, containing components of steel with a zinc dichromate plating for corrosion resistance. Provide lock case that is multi-function and field reversible for handing without opening case. Cylinders: Refer to “KEYING” article, herein. 2. Provide locks with standard 2-3/4 inches (70 mm) backset with full 3/4 inch (19 mm) throw stainless steel mechanical anti-friction latchbolt. Provide deadbolt with full 1 inch (25 mm) throw, constructed of stainless steel. 3. Provide standard ASA strikes unless extended lip strikes are necessary to protect trim. 4. Lever Trim: Solid brass, bronze, or stainless steel, cast or forged in design specified, with wrought roses and external lever spring cages. Provide thru- bolted levers with 2-piece spindles. 5. Lever Design: As scheduled. 6. Tactile Warning (Knurling): Where required by authority having jurisdiction. Provide on levers on exterior (secure side) of doors serving rooms considered to be hazardous. 7. Scheduled Manufacturer and Product: Schlage L9000 series. 2.6 CYLINDERS AND KEYING A. General: Cylinder manufacturer to have minimum (10) years experience designing secured master key systems and have on record a published security keying system policy. B. Source Limitations: Obtain each type of keyed cylinder and keys from the same source manufacturer as locksets and exit devices, unless otherwise indicated. C. Cylinders: Original manufacturer cylinders complying with the following: 1. Mortise Type: Threaded cylinders with rings and cams to suit hardware application. 2. Rim Type: Cylinders with back plate, flat-type vertical or horizontal tailpiece, and raised trim ring. 3. Bored-Lock Type: Cylinders with tailpieces to suit locks. 4. Mortise and rim cylinder collars to be solid and recessed to allow the cylinder face to be flush and be free spinning with matching finishes. 5. Keyway: Match Facility Standard. D. Keying System: Each type of lock and cylinders to be factory keyed. 1. Supplier shall conduct a "Keying Conference" to define and document keying system instructions and requirements. 386 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 11 DOOR HARDWARE 2. Furnish factory cut, nickel-silver large bow permanently inscribed with a visual key control number as directed by Owner. 3. New System: Key locks to a new key system as directed by the Owner. E. Key Quantity: Provide the following minimum number of keys: 1. Change Keys per Cylinder: Two (2) 2. Master Keys (per Master Key Level/Group): Five (5). 3. Construction Keys (where required): Ten (10). F. Construction Keying: Provide construction master keyed cylinders. 2.7 EXIT DEVICES A. Requirements: 1. Provide exit devices tested to ANSI/BHMA A156.3 Grade 1, and UL listed for Panic Exit or Fire Exit Hardware. Cylinders: Refer to “KEYING” article, herein. 2. Provide touchpad type exit devices, fabricated of brass, bronze, stainless steel, or aluminum, plated to standard architectural finishes to match balance of door hardware. 3. Touchpad: Extend minimum of one half of door width. Match exit device finish, stainless steel for US26, US26D, US28, US32, and US32D finishes; and for all other finishes, provide compatible finish to exit device. No plastic inserts are allowed in touchpads. 4. Provide exit devices with dead-latching feature for security and for future addition of alarm kits and/or other electrified requirements. 5. Provide flush end caps for exit devices. 6. Provide exit devices with manufacturer’s approved strikes. 7. Provide exit devices cut to door width and height. Install exit devices at height recommended by exit device manufacturer, allowable by governing building codes, and approved by Architect. 8. Mount mechanism case flush on face of doors, or provide spacers to fill gaps behind devices. Where glass trim or molding projects off face of door, provide glass bead kits. 9. Where lever handles are specified as outside trim for exit devices, provide heavy- duty lever trims with forged or cast escutcheon plates. Provide vandal-resistant levers that will travel to 90-degree down position when more than 35 pounds of torque are applied, and which can easily be re-set. a. Lever Style: Match lever style of locksets. b. Tactile Warning (Knurling): Where required by authority having jurisdiction. Provide on levers on exterior (secure side) of doors serving rooms considered to be hazardous. 10. Accessibility: Maximum 5lbs force to retract latch bolt per CBC Chapter 11B. “AX” feature: touchpad directly retracts the latchbolt with 5 lb or less of force. Provide testing lab certification confirming that the mechanical device is independent third-party tested to meet this 5 lb requirement. 387 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 12 DOOR HARDWARE 11. Provide UL labeled fire exit hardware for fire rated openings. 12. Provide factory drilled weep holes for exit devices used in full exterior application, highly corrosive areas, and where noted in hardware sets. 13. Provide electrified options as scheduled. 14. Scheduled Manufacturer and Product: Von Duprin 98 series. 2.8 DOOR CLOSERS A. Requirements: 1. Provide door closers conforming to ANSI/BHMA A156.4 Grade 1 requirements by BHMA certified independent testing laboratory. ISO 9000 certify closers. Stamp units with date of manufacture code. 2. Provide door closers with fully hydraulic, full rack and pinion action with high strength cast iron cylinder, and full complement bearings at shaft. 3. Cylinder Body: 1-1/2 inch (38 mm) diameter with 3/4 inch (19 mm) diameter double heat-treated pinion journal. 4. Hydraulic Fluid: Fireproof, passing requirements of UL10C, and requiring no seasonal closer adjustment for temperatures ranging from 120 degrees F to -30 degrees F. 5. Spring Power: Continuously adjustable over full range of closer sizes, and providing reduced opening force as required by accessibility codes and standards. 6. Hydraulic Regulation: By tamper-proof, non-critical valves, with separate adjustment for latch speed, general speed, and backcheck. 7. Provide closers with solid forged steel main arms and factory assembled heavy- duty forged forearms for parallel arm closers. 8. Pressure Relief Valve (PRV) Technology: Not permitted. 9. Finish for Closer Cylinders, Arms, Adapter Plates, and Metal Covers: Powder coating finish which has been certified to exceed 100 hours salt spray testing as described in ANSI Standard A156.4 and ASTM B117, or has special rust inhibitor (SRI). 10. Provide special templates, drop plates, mounting brackets, or adapters for arms as required for details, overhead stops, and other door hardware items interfering with closer mounting. 11. Scheduled Manufacturer and Product: LCN 4040XP series. B. Requirements: 1. Provide door closers conforming to ANSI/BHMA A156.4 Grade 1 requirements by BHMA certified independent testing laboratory. 2. Provide door closers with fully hydraulic, full rack and pinion action cast iron cylinder. 3. Cylinder Body: 1-1/4 inch (32 mm) diameter with 5/8 inch (16 mm) diameter heat- treated pinion journal. 388 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 13 DOOR HARDWARE 4. Hydraulic Fluid: Fireproof, passing requirements of UL10C, and requiring no seasonal closer adjustment for temperatures ranging from 120 degrees F to -30 degrees F. 5. Spring Power: Continuously adjustable over full range of closer sizes, and providing reduced opening force as required by accessibility codes and standards. 6. Hydraulic Regulation: By tamper-proof, non-critical valves, with separate adjustment for latch speed, general speed, and backcheck. 7. Pressure Relief Valve (PRV) Technology: Not permitted. 8. Provide special templates, drop plates, mounting brackets, or adapters for arms as required for details, overhead stops, and other door hardware items interfering with closer mounting. 9. Scheduled Manufacturer and Product: LCN 1460 series. 2.9 CONCEALED DOOR CLOSERS A. Requirements: 1. Provide concealed door closers at doors conforming to ANSI/BHMA A156.4 Grade 1 requirements by BHMA certified independent testing laboratory. 2. Provide heavy duty, single-acting closers with single lever arm and roller assembly. 3. Provide closers capable of being mounted in a minimum 1-3/4 inch header. 4. Provide concealed door closers with fully hydraulic, full rack and pinion action with high strength cast iron cylinder, and full complement bearings at shaft. 5. Cylinder Body: 1-1/8 inch (29 mm) piston diameter, with 5/8 inch (16 mm) diameter heat-treated pinion journal. 6. Provide all-weather hydraulic fluid, fireproof, passing requirements of UL10C. 7. Pressure Relief Valve (PRV) Technology: Not permitted. 8. Provide special template, drop plates, mounting brackets, or adapters for arms as required for details, overhead stops, and other door hardware items interfering with closer mounting. 1. Scheduled Manufacturer and Product: LCN 2030 series. 2.10 ELECTRO-MECHANICAL AUTOMATIC OPERATORS A. Requirements: 1. Provide low energy automatic operator units that are electro-mechanical design complying with ANSI/BHMA A156.19. a. Opening: Powered by DC motor working through reduction gears. b. Closing: Spring force. c. Manual, hydraulic, or chain drive closers: Not permitted. d. Operation: Motor is off when door is in closing mode. Door can be manually operated with power on or off without damage to operator. 389 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 14 DOOR HARDWARE Provide variable adjustments, including opening and closing speed adjustment. e. Cover: Aluminum. 2. Provide units with manual off/auto/hold-open switch, push and go function to activate power operator, vestibule interface delay, electric lock delay, hold-open delay adjustable from 2 to 30 seconds, and logic terminal to interface with accessories, mats, and sensors. 3. Provide drop plates, brackets, or adapters for arms as required to suit details. 4. Provide hard-wired motion sensors and/or actuator switches for operation as specified. Provide weather-resistant actuators at exterior applications. 5. Provide key switches, with LED’s, recommended and approved by manufacturer of automatic operator as required for function as described in operation description of hardware sets. Cylinders: Refer to “KEYING” article, herein. 6. Provide complete assemblies of controls, switches, power supplies, relays, and parts/material recommended and approved by manufacturer of automatic operator for each individual leaf. Actuators control both doors simultaneously at pairs. Sequence operation of exterior and vestibule doors with automatic operators to allow ingress or egress through both sets of openings as directed by Architect. Locate actuators, key switches, and other controls as directed by Architect. 7. Provide units with inputs for smoke evacuation doors, where specified, which allow doors to power open upon fire alarm activation and hold open indefinitely or until fire alarm is reset, presence detector input, which prevents closed door from opening or door that is fully opened from closing, hold open toggle input, which allows remote activation for indefinite hold open and close second time input is activated, vestibule inputs, which allow sequencing operation of two units, and SPDT relay for interfacing with latching or locking devices. 2.11 ELECTRIC STRIKES A. Requirements: 1. Provide electric strikes designed for use with type of locks shown at each opening. 2. Provide electric strikes UL Listed as burglary-resistant. 3. Where required, provide electric strikes UL Listed for fire doors and frames. 4. Provide fail-secure type electric strikes, unless specified otherwise. 5. Coordinate voltage and provide transformers and rectifiers for each strike as required. 6. Scheduled Manufacturer and Product: Von Duprin 6000 series. 2.12 POWER SUPPLIES A. Requirements: 390 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 15 DOOR HARDWARE 1. Provide power supplies, recommended and approved by manufacturer of electrified locking component, for operation of electrified locks, electrified exit devices, magnetic locks, electric strikes, and other components requiring power supply. 2. Provide appropriate quantity of power supplies necessary for proper operation of electrified locking components as recommended by manufacturer of electrified locking components with consideration for each electrified component using power supply, location of power supply, and approved wiring diagrams. Locate power supplies as directed by Architect. 3. Provide regulated and filtered 24 VDC power supply , and UL class 2 listed. 4. Options: a. Provide power supply, where specified, with internal capability of charging sealed backup batteries 24 VDC, in addition to operating DC load. b. Provide sealed batteries for battery back-up at each power supply where specified. c. Provide keyed power supply cabinet. 5. Provide power supply in an enclosure, complete, and requiring 120VAC to fused input. 6. Provide power supply with emergency release terminals, where specified, that allow release of all devices upon activation of fire alarm system complete with fire alarm input for initiating “no delay” exiting mode. 7. Scheduled Manufacturer and Product: Schlage Electronics PS900 series. 2.13 ARCHITECTURAL TRIM A. Door Protective Trim 1. General: Door protective trim units to be of type and design as specified below or in the Hardware Sets. 2. Size: Fabricate protection plates (kick, armor, or mop) not more than 2" less than door width (LDW) on stop side of single doors and 1” LDW on stop side of pairs of doors, and not more than 1" less than door width on pull side. Coordinate and provide proper width and height as required where conflicting hardware dictates. Height to be as specified in the Hardware Sets. 3. Where plates are applied to fire rated doors with the top of the plate more than 16” above the bottom of the door, provide plates complying with NFPA 80. Consult manufacturer’s catalog and template book for specific requirements for size and applications. 4. Protection Plates: ANSI/BHMA A156.6 certified protection plates (kick, armor, or mop), fabricated from the following: a. Stainless Steel: 300 grade, 050-inch thick. 391 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 16 DOOR HARDWARE 5. Options and fasteners: Provide manufacturer's designated fastener type as specified in the Hardware Sets. Provide countersunk screw holes. 6. Scheduled Manufacturer: Ives. 2.14 DOOR STOPS AND HOLDERS A. General: Door stops and holders to be of type and design as specified below or in the Hardware Sets. B. Door Stops and Bumpers: ANSI/BHMA A156.16, Grade 1 certified door stops and wall bumpers. Provide wall bumpers, either convex or concave types with anchorage as indicated, unless floor or other types of door stops are specified in Hardware Sets. Do not mount floor stops where they will impede traffic. Where floor or wall bumpers are not appropriate, provide overhead type stops and holders. 1. Scheduled Manufacturer: Ives. 2.15 ARCHITECTURAL SEALS A. General: Thresholds, weatherstripping, and gasket seals to be of type and design as specified below or in the Hardware Sets. Provide continuous weatherstrip gasketing on exterior doors and provide smoke, light, or sound gasketing on interior doors where indicated. At exterior applications provide non-corrosive fasteners and elsewhere where indicated. B. Smoke Labeled Gasketing: Assemblies complying with NFPA 105 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for smoke control ratings indicated, based on testing according to UL 1784. 1. Provide smoke labeled perimeter gasketing at all smoke labeled openings. C. Fire Labeled Gasketing: Assemblies complying with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing according to UL-10C. 1. Provide intumescent seals as indicated to meet UL10C Standard for Positive Pressure Fire Tests of Door Assemblies, and NPFA 252, Standard Methods of Fire Tests of Door Assemblies. D. Sound-Rated Gasketing: where indicated E. Replaceable Seal Strips: Provide only those units where resilient or flexible seal strips are easily replaceable and readily available from stocks maintained by manufacturer. F. Scheduled Manufacturer: Zero International. 392 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 17 DOOR HARDWARE 2.16 FABRICATION A. Fasteners: Provide door hardware manufactured to comply with published templates generally prepared for machine, wood, and sheet metal screws. Provide screws according to manufacturers recognized installation standards for application intended. 2.17 FINISHES A. Standard: Designations used in the Hardware Sets and elsewhere indicate hardware finishes complying with ANSI/BHMA A156.18, including coordination with traditional U.S. finishes indicated by certain manufacturers for their products. B. Provide quality of finish, including thickness of plating or coating (if any), composition, hardness, and other qualities complying with manufacturer's standards, but in no case less than specified by referenced standards for the applicable units of hardware C. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine scheduled openings, with Installer present, for compliance with requirements for installation tolerances, labeled fire door assembly construction, wall and floor construction, and other conditions affecting performance. B. Notify architect of any discrepancies or conflicts between the door schedule, door types, drawings and scheduled hardware. Proceed only after such discrepancies or conflicts have been resolved in writing. 3.2 PREPARATION A. Hollow Metal Doors and Frames: Comply with ANSI/DHI A115 series. B. Wood Doors: Comply with ANSI/DHI A115-W series. 3.3 INSTALLATION A. Install each item of mechanical and electromechanical hardware and access control equipment to comply with manufacturer's written instructions and according to specifications. 393 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 18 DOOR HARDWARE 1. Installers are to be trained and certified by the manufacturer on the proper installation and adjustment of fire, life safety, and security products including: hanging devices; locking devices; closing devices; and seals. B. Mounting Heights: Mount door hardware units at heights indicated in following applicable publications, unless specifically indicated or required to comply with governing regulations: 1. Standard Steel Doors and Frames: DHI's "Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames." 2. Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for Wood Flush Doors." 3. Where indicated to comply with accessibility requirements, comply with ANSI A117.1 "Accessibility Guidelines for Buildings and Facilities." 4. Provide blocking in drywall partitions where wall stops or other wall mounted hardware is located. C. Retrofitting: Install door hardware to comply with manufacturer's published templates and written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work specified in Division 9 Sections. Do not install surface-mounted items until finishes have been completed on substrates involved. D. Thresholds: Set thresholds for exterior and acoustical doors in full bed of sealant complying with requirements specified in Division 7 Section "Joint Sealants." E. Storage: Provide a secure lock up for hardware delivered to the project but not yet installed. Control the handling and installation of hardware items so that the completion of the work will not be delayed by hardware losses before and after installation. 3.4 FIELD QUALITY CONTROL A. Engage qualified manufacturer trained representative to perform inspections and to prepare inspection reports. 1. Representative will inspect door hardware and state in each report whether installed work complies with or deviates from requirements, including whether door hardware is properly installed and adjusted. 3.5 ADJUSTING A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements. 394 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 19 DOOR HARDWARE 3.6 CLEANING AND PROTECTION A. Protect all hardware stored on construction site in a covered and dry place. Protect exposed hardware installed on doors during the construction phase. Install any and all hardware at the latest possible time frame. B. Clean adjacent surfaces soiled by door hardware installation. C. Clean operating items as necessary to restore proper finish. Provide final protection and maintain conditions that ensure door hardware is without damage or deterioration at time of owner occupancy. 3.7 DEMONSTRATION A. Instruct Owner's maintenance personnel to adjust, operate, and maintain mechanical and electromechanical door hardware. 3.8 DOOR HARDWARE SETS A. The hardware sets represent the design intent and direction of the owner and architect. They are a guideline only and should not be considered a detailed hardware schedule. Discrepancies, conflicting hardware and missing items should be brought to the attention of the architect with corrections made prior to the bidding process. Omitted items not included in a hardware set should be scheduled with the appropriate additional hardware required for proper application and functionality. 1. Quantities listed are for each pair of doors, or for each single door. 2. The supplier is responsible for handing and sizing all products. 3. Where multiple options for a piece of hardware are given in a single line item, the supplier shall provide the appropriate application for the opening. B. Manufacturer’s Abbreviations: 1. DON – Don Jo 2. GLY – Glynn Johnson 3. IVE – Ives 4. KEE – Keedex,Inc. 5. LCN – LCN 6. LOX – Locinox 7. MCK – McKinney 8. SCE – Schlage Electronics 9. SCH – Schlage 10. VON – Von Duprin 11. ZER – Zero International 395 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 20 DOOR HARDWARE Hardware Sets: HW SET: 01 DOOR NUMBERS: 130.2 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA PIVOT SET 7215 SET 626 IVE 1 EA POWER TRANSFER EPT10 689 VON 1 EA ELEC PANIC HARDWARE RX-QELX-AX-35A-NL-OP-388-CON 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA 90 DEG OFFSET PULL 8190HD 12" O 630 IVE 1 EA OH STOP 90S 630 GLY 1 EA CONCEALED CLOSER 2030 SERIES ST-2211 WMS 689 LCN 1 EA PERIMETER SEAL BY ALUMINUM DOOR/FRAME MANUFACTURER B/O 1 EA THRESHOLD 103A-223 OR PER SILL DETAIL A ZER 1 EA WIRE HARNESS (DOOR) CON- (LENGTH AS REQ'D) SCH 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA DOOR CONTACT 7764 628 SCE 1 EA POWER SUPPLY PS902 900-2RS 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. 396 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 21 DOOR HARDWARE HW SET: 02 DOOR NUMBERS: 106B EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 2 EA HINGE 5BB1HW 4.5 X 4.5 NRP 630 IVE 1 EA ELECTRIC HINGE 5BB1HW 4.5 X 4.5 CON TW8 630 IVE 1 EA ELEC PANIC HARDWARE RX-QELX-AX-98-L-NL-06-CON 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN 1 EA RAIN DRIP (DOOR) 11A A ZER 1 EA RAIN DRIP (FRAME) 142AA (OMIT WHERE OVERHANG OCCURS) AA ZER 1 EA DOOR SEAL 188SBK PSA BK ZER 1 EA DOOR SHOE 111AA AA ZER 1 EA THRESHOLD 103A-223 OR PER SILL DETAIL A ZER 1 EA WIRE HARNESS (DOOR) CON- (LENGTH AS REQ'D) SCH 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA DOOR CONTACT 679-05HM BLK SCE 1 EA POWER SUPPLY PS902 900-2RS 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. HW SET: 03 DOOR NUMBERS: 105A EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 630 IVE 1 EA PANIC HARDWARE AX-98-L-NL-06 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN 1 EA RAIN DRIP (DOOR) 11A A ZER 1 EA RAIN DRIP (FRAME) 142AA (OMIT WHERE OVERHANG OCCURS) AA ZER 1 EA DOOR SEAL 188SBK PSA BK ZER 1 EA DOOR SHOE 111AA AA ZER 1 EA THRESHOLD 103A-223 OR PER SILL DETAIL A ZER 397 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 22 DOOR HARDWARE HW SET: 04 DOOR NUMBERS: 100.4 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 2 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE 1 EA ELECTRIC HINGE 5BB1HW 4.5 X 4.5 CON TW8 652 IVE 1 EA ELEC PANIC HARDWARE RX-AX-98-L-M996-06-FSE-CON 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 SCUSH FC 689 LCN 1 EA PA MOUNTING PLATE 1460-18PAFC SRT (IF REQUIRED) 689 LCN 1 EA CUSH SHOE SUPPORT 1460-30 SRT (IF REQUIRED) 689 LCN 1 EA BLADE STOP SPACER 1460-61 SRT (IF REQUIRED) 689 LCN 1 EA PERIMETER SEAL BY ALUMINUM DOOR/FRAME MANUFACTURER B/O 1 EA WIRE HARNESS (DOOR) CON- (LENGTH AS REQ'D) SCH 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. WIDE STILE DOOR REQUIRED. 398 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 23 DOOR HARDWARE HW SET: 05 DOOR NUMBERS: 106 131.1 131.3 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 2 EA HINGE 5BB1 4.5 X 4.5 NRP 652 IVE 1 EA ELECTRIC HINGE 5BB1 4.5 X 4.5 CON TW8 652 IVE 1 EA EU STOREROOM LOCK ND80PDEU RHO RX CON 12V/24V DC (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O 1 EA WIRE HARNESS (DOOR) CON- (LENGTH AS REQ'D) SCH 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. HW SET: 06 DOOR NUMBERS: 112A EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 2 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA ELECTRIC HINGE 5BB1 4.5 X 4.5 CON TW8 652 IVE 1 EA EU STOREROOM LOCK ND80PDEU RHO RX CON 12V/24V DC (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC (MOUNT REG ARM) 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O 1 EA WIRE HARNESS (DOOR) CON- (LENGTH AS REQ'D) SCH 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. 399 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 24 DOOR HARDWARE HW SET: 07 DOOR NUMBERS: 105 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 NRP 652 IVE 1 EA PANIC HARDWARE AX-98-L-NL-06 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 3 EA SILENCER SR64 GRY IVE HW SET: 08 DOOR NUMBERS: 112B EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 NRP 652 IVE 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O HW SET: 09 DOOR NUMBERS: 130C EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC (MOUNT REG ARM) 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O 400 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 25 DOOR HARDWARE HW SET: 10 DOOR NUMBERS: 235 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA OH STOP 90S 630 GLY 1 EA SURFACE CLOSER 1461 RW/PA FC (MOUNT REG ARM) 689 LCN 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O HW SET: 11 DOOR NUMBERS: 140 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC (MOUNT REG ARM) 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA DOOR SEAL 188SBK PSA BK ZER HW SET: 12 DOOR NUMBERS: 141 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 NRP 652 IVE 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA DOOR SEAL 188SBK PSA BK ZER 401 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 26 DOOR HARDWARE HW SET: 13 DOOR NUMBERS: 217 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 2 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA ELECTRIC HINGE 5BB1 4.5 X 4.5 CON TW8 652 IVE 1 EA EU STOREROOM LOCK ND80PDEU RHO RX CON 12V/24V DC (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC (MOUNT REG ARM) 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA DOOR SEAL 188SBK PSA BK ZER 1 EA AUTO DOOR BOTTOM 364AA-Z49 AA ZER 1 EA THRESHOLD 63A-223 (IF REQUIRED) A ZER 1 EA WIRE HARNESS (DOOR) CON- (LENGTH AS REQ'D) SCH 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. HW SET: 14 DOOR NUMBERS: 113 114 115 116 134 218 241 220 224 242 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA ENTRANCE/OFFICE LOCK ND50PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O HW SET: 15 - Not Used 402 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 27 DOOR HARDWARE HW SET: 16 DOOR NUMBERS: 131.2 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 NRP 652 IVE 1 EA CLASSROOM LOCK ND70PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC 689 LCN 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O HW SET: 17 DOOR NUMBERS: 130.1 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 6 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA CONST LATCHING BOLT FB61P 630 IVE 1 EA DUST PROOF STRIKE DP1 OR DP2 AS REQ'D 626 IVE 1 EA CLASSROOM LOCK ND70PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 2 EA SURFACE CLOSER 1461 RW/PA FC (MOUNT REG ARM) 689 LCN 2 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O 1 EA ASTRAGAL 41AA AA ZER 403 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 28 DOOR HARDWARE HW SET: 18 DOOR NUMBERS: 130A EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA PRIVACY LOCK ND40S RHO 626 SCH 1 EA SURFACE CLOSER 1461 RW/PA FC (MOUNT REG ARM) 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE 1 EA WALL OR FLOOR STOP WS406/407CCV OR FS436/438 AS REQ 630 IVE 1 EA PERIMETER SEAL BY ALUMINUM FRAME MANUFACTURER B/O HW SET: 19 DOOR NUMBERS: MG1 MG2 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA SPRING PIVOT HINGE 4007MRB 626 MCK 1 EA ROLLER CATCH 335 626 IVE 1 EA MAGNETIC LOCK M420P 12/24 VDC 628 SCE 1 EA PUSH PLATE 8200 3" X 12" 630 IVE 1 EA DOOR PULL 9266 12" I 630-316 IVE 1 EA DESK MOUNT BUTTON 660-T4 628 SCE 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. HW SET: 20 DOOR NUMBERS: E100 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA SURF. AUTO OPERATOR 9553 REG/STD HL/D AS REQ (120/240 VAC) ANCLR LCN 2 EA ACTUATOR, TOUCH 8310-836T 630 LCN 2 EA BOLLARD POST 8310-866FLA LCN 2 EA DOOR SWEEP 39A A ZER 1 EA THRESHOLD 1675A-223 OR PER SILL DETAIL A ZER 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. BALANCE OF EXISTING HARDWARE TO REMAIN. 404 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 29 DOOR HARDWARE HW SET: 21 DOOR NUMBERS: E141.1 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA RAIN DRIP (DOOR) 11A A ZER 1 EA RAIN DRIP (FRAME) 142AA (OMIT WHERE OVERHANG OCCURS) AA ZER 1 EA DOOR SEAL 188SBK PSA BK ZER 1 EA DOOR SHOE 111AA AA ZER 1 EA THRESHOLD 103A-223 OR PER SILL DETAIL A ZER BALANCE OF EXISTING HARDWARE TO REMAIN. HW SET: 22 DOOR NUMBERS: E212 R111 R132 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA ELECTRIC STRIKE 6211AL FSE DS CON 12/16/24/28 VAC/VDC 630 VON 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. BALANCE OF EXISTING HARDWARE TO REMAIN. 405 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 30 DOOR HARDWARE HW SET: 23 DOOR NUMBERS: R112 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA PANIC HARDWARE AX-98-L-NL-06 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA ELECTRIC STRIKE 6111 FSE DS CON 12/24 VAC/VDC 630 VON 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. BALANCE OF EXISTING HARDWARE TO REMAIN. HW SET: 24 DOOR NUMBERS: E110 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA PANIC HARDWARE AX-9827-EO-LBR 626 VON 1 EA PANIC HARDWARE AX-9827-L-LBR-06 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH BALANCE OF EXISTING HARDWARE TO REMAIN. HW SET: 25 DOOR NUMBERS: R108 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA PANIC HARDWARE AX-98-L-06 626 VON 1 EA RIM CYLINDER 20-022 (MATCH OWNER'S STANDARD KEYING) 626 SCH BALANCE OF EXISTING HARDWARE TO REMAIN. 406 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 31 DOOR HARDWARE HW SET: 26 DOOR NUMBERS: E100.5 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH BALANCE OF EXISTING HARDWARE TO REMAIN. HW SET: 27 DOOR NUMBERS: R111.1 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA ENTRANCE/OFFICE LOCK ND50PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH BALANCE OF EXISTING HARDWARE TO REMAIN. HW SET: 28 DOOR NUMBERS: R106.1 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA CLASSROOM LOCK ND70PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH BALANCE OF EXISTING HARDWARE TO REMAIN. HW SET: 29 DOOR NUMBERS: E206A EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA PRIVACY LOCK ND40S RHO 626 SCH BALANCE OF EXISTING HARDWARE TO REMAIN. 407 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 32 DOOR HARDWARE HW SET: 30 DOOR NUMBERS: E103 E107 E107.1 E110A E133 R117 R118 R119 R120 R121 E200A E200A.1 E200B.1 E203 E206 E208 E210.1 E211 E213 E214 E215 E216 E219 E223 E231 E231A E231B E232 E233 E234 E237 E243 E244 R222 R225 R236 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR ALL EXISTING HARDWARE TO REMAIN. (SINGLE DOOR) HW SET: 31 DOOR NUMBERS: E201 E207 E210 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR ALL EXISTING HARDWARE TO REMAIN. (PAIR DOORS) HW SET: 32 DOOR NUMBERS: MG3 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA SPRING PIVOT HINGE 4007RB 626 MCK 1 EA STOREROOM LOCK ND80PD RHO (MATCH OWNER'S STANDARD KEYING) 626 SCH 1 EA ELECTRIC STRIKE 6211WF FSE DS CON 12/16/24/28 VAC/VDC 630 VON 1 EA WIRE HARNESS (FRAME) CON-6W SCH 1 EA CREDENTIAL READER BY SECURITY CONTRACTOR B/O 1 EA POWER SUPPLY PS902 120/240 VAC LGR SCE COORDINATE: ACCESS CONTROL, WIRING, CONDUIT, POWER WITH SECURITY CONTRACTOR. 408 MOORPARK CITY HALL TENANT IMPROVEMENT 05/5/2023 MOORPARK, CALIFORNIA 08 71 00 - 33 DOOR HARDWARE HW SET: 33 DOOR NUMBERS: YG1 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA STOREROOM LOCK L9080P 06A 630 SCH 1 EA WELDABLE GATE BOX (LOCK) K-BXMOR1 600 KEE BALANCE OF HARDWARE BY GATE MANUFACTURER. HW SET: 34 DOOR NUMBERS: YG2 YG3 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 SET GATE HINGE/CLOSER MAMMOTH-HD AL LOX 1 EA PANIC HARDWARE AX-98-L-NL-06-WH 630 VON 1 EA RIM CYLINDER 20-022 626 SCH BALANCE OF HARDWARE BY GATE MANUFACTURER. HW SET: 35 DOOR NUMBERS: YG4 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR ALL HARDWARE BY GATE MANUFACTURER. HW SET: 36 DOOR NUMBERS: E102 E104 E202 E204 EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA PUSH PLATE 8200 4" X 16" 630 IVE 1 EA PULL PLATE 8303 8" 4" X 16" 630 IVE 1 EA EDGE FILLER PLATE EF-161 600 DON 1 EA ASA STRIKE FILLER PLATE FS-260-PC 600 DON BALANCE OF EXISTING HARDWARE TO REMAIN. END OF SECTION 409 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 80 00 - 1 Glazing SECTION 08 80 00 GLAZING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide miscellaneous glass and glazing not provided elsewhere including accessories as required for complete installation. a. Provide glazing for metal doors and frames. b. Provide glazing for interior aluminum frames. c. Provide glazing for wood doors. B. Related Sections: 1. Section 08 41 00 Entrances and Storefronts 2. Section 08 83 00: Frameless mirrors. 3. Section 08 11 10 Hollow Metal Doors and Frames 4. Section 08 11 20 Interior Aluminum Frames 5. Section 08 14 00 Wood Doors Flush 1.2 REFERENCES A. Glass Association of North America (GANA): Glazing Manual and Sealant Manual. 1.3 SUBMITTALS A. Product Data: Furnish for each type of glass and exposed glazing material. B. Samples: Furnish samples of glazing assemblies with color to match existing conditions. 1.4 WARRANTY A. Extended Correction Period: Extend correction period to two years for following. 1. Replacing laminated glass which exhibits signs of delaminating. 2. Replacing insulated glass which exhibits signs of moisture on sealed glass surfaces. 3. Replacing mirrors which exhibit signs of desilvering or signs of distortion. 410 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 80 00 - 2 Glazing PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Section includes miscellaneous glass and glazing materials for items typically furnished without glazing and where glazing is not an integral part of the assembly. B. Regulatory Requirements: 1. Safety Glass Standard: Comply with applicable codes, CPSC 16 CFR 1201, and pass ANSI Z97.1. C. Float Glass: Select glazing quality, clear annealed glass, ASTM C1036; nominal thickness 1/4". 1. Manufacturers: a. Vitro Architectural Glass (formerly PPG). b. Oldcastle Glazing. c. Guardian Industries Corp. d. Substitutions: Refer to Section 01 25 00. 2. Locations: Provide where indicated as clear glass. D. Tempered Glass: Select glazing quality, clear float glass, fully tempered, ASTM C1048, Kind FT; nominal thickness 1/4"; safety glass. 1. Manufacturers: a. Vitro Architectural Glass (formerly PPG). b. Oldcastle Glazing. c. Guardian Industries Corp. d. Substitutions: Refer to Section 01 25 00. 2. Locations: Provide at doors and at window openings where required by applicable codes and federal requirements. E. Insulated Glass: Preassembled units consisting of organically sealed panes of glass enclosing a hermetically sealed dehydrated air space with minus 20-degree F dew point. 1. Manufacturers: a. Vitro Architectural Glass (formerly PPG). b. Oldcastle Glazing. c. Guardian Industries Corp. d. Viracon. e. Substitutions: Refer to Section 01 25 00. 2. Performance: Certified to ASTM E2190 by Insulating Glass Certification Council. 411 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 80 00 - 3 Glazing 3. System: Manufacturer's standard dual seal system compatible with glazing system, and including spacers, desiccant, and standard corner construction. 4. Glass: ASTM C1036, select glazing quality clear float glass; nominal 1/4” thick glass. 5. Safety Glass: ASTM C1048, Kind FT, fully tempered select glazing quality clear float glass; nominal 1/4” thick glass; provide at doors and impact areas where safety glass is required by applicable codes and regulations. 6. Total Unit Thickness: 1". 7. Locations: Provide at exterior windows and doors unless otherwise indicated. 8. Basis of Design is Viracon Solar Cool, Solar Blue + Solar Ban 60. Final selection based on in field comparison of equivalent samples for color match to existing. 9. Glazing Materials: Type approved for use in applications indicated for required fire ratings; refer to fire label requirements. 10. Location: Provide at fire rated openings indicated to receive wired glass. F. Spacer Shims: Silicone compatible, 50 durometer hardness; 3" long by 3/32" thick by 1/4" high. G. Setting Blocks: 70-90 durometer hardness; 4” long by 3/8” thick by 1/4” high standard setting blocks. H. Glazing Sealant: ASTM C920, Type S, Grade NS, elastomeric one-component silicone glazing sealants as recommended by sealant manufacturer for application involved. 1. Manufacturers: a. Dow Corning Corp. b. General Electric Co. c. Pecora Corp. d. Substitutions: Refer to Section 01 25 00. 2. Structural and Butt Glazing: Provide high-modulus structural silicone glazing materials recommended by sealant manufacturer for applications where sealant bonds glass to metal system and where sealant bonds glass to glass. 3. Color: As selected by Architect from manufacturer's full range of available colors. I. Glazing Putty: Linseed oil putty, ASTM C570, Type II; oil and resin base caulking compound for building construction; knife grade.1. 412 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 80 00 - 4 Glazing 1. Manufacturers: a. DAP, Inc. b. Substitutions: Refer to Section 01 25 00. PART 3 - EXECUTION 3.1 PREPARATION A. Clean glazing channels and framing members to receive glass immediately before glazing; remove coatings not firmly bonded to substrate. B. Apply primer to joint surfaces where recommended by sealant manufacturer. 3.2 INSTALLATION A. Comply with GANA Glazing Manual and Sealant Manual and glazing manufacturer recommendations and installation instructions. 1. Do not allow glass to touch metal surfaces. 2. Comply with applicable code requirements and NFPA 80 for glass in fire rated openings. B. Place setting blocks at quarter points in thin course of sealant. C. Install removable stops with glass centered in space with spacer shims at 2'-0" intervals on both sides of glass, 1/4" below sightline. D. Sealant Glazing: Fill gap between glass and stops with sealant to depth equal to bite of frame on glass but not more than 3/8" below sightline. 1. Apply sealant to uniform and level line, flush with sightline; tool or wipe sealant surface for smooth appearance; at exterior locations tool sealant so water is carried away from glass. 3.3 CLEANING A. At areas subject to potential impact mark glass after installation by crossed streamers attached to framing and held away from glass; do not apply markers to surface of glass. B. Remove nonpermanent labels immediately after sealant cures; cure sealants for high early strength and durability. C. Remove and replace glass which is broken, chipped, cracked, abraded or damaged during construction period, including natural causes, accidents and vandalism. END OF SECTION 413 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 83 00 - 1 Frameless Mirrors SECTION 08 83 00 FRAMELESS MIRRORS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Typical: Provide frameless glass mirrors with accessories as required for complete installation. 1.2 REFERENCES A. Glass Association of North America (GANA): Glazing Manual and Sealant Manual. 1.3 SUBMITTALS A. Product Data: Furnish for mirror glass. B. Samples: Furnish samples of mirror glass with finished edges and corners. 1.4 WARRANTY A. Special Warranties: Replace mirrors which exhibit signs of desilvering or signs of distortion. 1. Special Warranty Period: Two years. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide frameless mirrors with accessories as required for complete installation. B. Safety Glass Standard: Comply with applicable codes, CPSC 16 CFR 1201, and pass ANSI Z97.1. C. Typical Frameless Glass Mirrors: Mirror quality q1 or q2, clear float glass; 1/4" thick; full silver coating, copper coating and organic coating; factory treated and sealed after cutting and finishing. 1. Manufacturers: a. Guardian Glass. b. Lenoir Mirror Company, Lenoir, NC. c. Substitutions: Refer to Section 01 25 00. 414 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 08 83 00 - 2 Frameless Mirrors 2. Edges: Provide edges designed to eliminate cutting potential at edges and corners commonly referred to as arrised edges, as approved by Architect. 1. Glass: Mirror quality q1 or q2, clear float glass; factory treated and sealed after cutting and finishing. 2. Edges: Provide edges designed to eliminate cutting potential at edges and corners commonly referred to as arrised edges, as approved by Architect. 3. Glass Thickness: Nominal 1/4" total thickness unless otherwise indicated. 4. Polyvinyl Butyral Core Thickness: Minimum 30 mil. 5. Reflective Coating: Coating may be standard full silver reflective metallic coating on Number 2 surface or may be mirror reflective surface on polyvinyl butyral core. D. Mirror Attachment: 1. Bottom Supports: Brite anodized aluminum angles such as Glass Distributors Inc. (301.779.2430)/Brite Anodized Aluminum 3/8” L-Bar Extrusion, provide felt pads for setting mirrors on angles; provide concealed fasteners. 2. Adhesive: Nontoxic type as recommended by mirror manufacturer. PART 3 - EXECUTION 3.1 INSTALLATION A. Comply with GANA Glazing Manual and mirror manufacturer instructions. 1. Do not allow glass to touch metal surfaces. B. Provide ventilation to coating. C. Set or trim felt to face of mirror. 3.2 CLEANING A. Remove nonpermanent labels immediately after installation. B. Remove and replace mirrors which are broken, chipped, cracked, abraded or damaged during construction period, including natural causes, accidents and vandalism at contractor’s expense. END OF SECTION 415 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -1 SECTION 08 62 23 TUBULAR DAYLIGHTING DEVICES PART 1 GENERAL 1.1 SECTION INCLUDES A. Tubular daylighting devices (TDD) and accessories. 1.2 RELATED SECTIONS A. Section 09 51 00 Acoustical Ceilings B. Section 07 55 00 MODIFIED BITUMINOUS ROOFING 1.3 REFERENCES A. American Architectural Manufacturers Association (AAMA): 1. AAMA/WDMA/CSA 101/I.S.2/A440 - Standard/Specification for Windows, Doors, and Unit Skylights; 2011. B. American National Standards Institute (ANSI): 1. ANSI C63.4-2014 - American National Standard for Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz C. ASTM International (ASTM): 1. ASTM A463/A463M - Standard Specification for Steel Sheet, Aluminum Coated, by the Hot Dip Process. 2. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc Coated (Galvanized), by the Hot Dip Process. 3. ASTM A792/A792M - Standard Specification for Steel Sheet, 55% Aluminum-Zinc Alloy-Coated by the Hot-Dip Process. 4. ASTM B209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate. 5. ASTM D635 - Test Method for Rate of Burning and/or Extent of Time of Burning of Self-Supporting Plastics in a Horizontal Position. 6. ASTM D1929 - Test Method for Ignition Properties of Plastics. 7. ASTM D2843 - Standard Test Method for Density of Smoke from the Burning or Decomposition of Plastics. 8. ASTM F1642 - Standard Test Method for Glazing and Glazing Systems Subject to Airblast Loading. 9. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials. 10. ASTM E108 - Standard Test Methods for Fire Tests of Roof Coverings. 11. ASTM E283 - Test Method for Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen. 12. ASTM E308 - Standard Practice for Computing the Colors of Objects by Using the CIE System. 13. ASTM E330 - Structural Performance of Exterior Windows, Curtain Walls, and Doors. D. California State OSHA Fall Protection Code of Regulations, Title 8, Section 3212 (e)(1). E. Code of Federal Regulations (CFR): 1. CFR 47 - Code of Federal Regulations (CFR) Rules and Regulations for FCC, FCC Part 15 - Radio Frequency Devices, Subpart B - Unintentional Radiators, Section 416 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -2 15.107 - Conducted Limits, and 15.109 - Radiated Emission Limits F. CSA Group (CSA): 1. CSA C22.2 No. 250.0 - Luminaires. G. Factory Mutual (FM): 1. FM Standard 4431 - The Approval Standard for Skylights. H. General Services Administration (GSA): 1. GSA-TS01-2003: Standard Test Method for Glazing and Window Systems Subject to Dynamic Overpressure Loadings. I. International Building Code (IBC): 1. IBC Section 1710 - Load Test Procedure for Wind Load Testing on Rooftop Daylight Collecting System - Structural Performance Testing - Devised by ATI PE); 2012. 2. IBC Section 2606.7.2 - Installation - Diffuser Fall Out Test (Devised by PE); 2012. J. OSHA 29 CFR - 1910.23 (e)(8) (Guarding Requirements for Skylights); 1926 Subpart M (Fall Protection); 1926.501(b)(4)(i); 1926.501(i)(2); 1926.501(b)(4)(ii). K. Underwriters' Laboratories (UL): 1. UL 2108 - Low Voltage Lighting Systems. 1.4 PERFORMANCE REQUIREMENTS A. Daylight Reflective Tubes: Spectralight Infinity with INFRAREDuction Technology combines ultra-high Visible Light reflectance with Ultra-low Infrared (IR) reflectance. Patented spectrally-selective optical surface yields an average total- and specular-reflectance for the Visible Light spectrum (400 nm to 700 nm) providing maximized visible light transmission and less than 25 percent reflectance for Infrared (IR) heat wavelengths (750 nm to 2500 nm) for minimized heat transmission, resulting in a spectrally-selective Total Solar Spectrum (250 nm to 2500 nm) reflectance less than 37 percent, as measured using a Perkin Elmer Lambda 1050 spectrophotometer with a Universal Reflectance Accessory. Color: a* and b* (defined by CIE L*a*b* color model) shall not exceed plus 2 or be less than minus 2 as determined in accordance with ASTM E308. B. SOLAMASTER 750 DS-O (OPEN CEILING) 1. AAMA/WDMA/CSA 101/IS2/A440, Class CW-PG70, size tested 21 inch (530 mm) diameter, Type TDDOC and Type TDDCC. a. Air Infiltration Test: 1) Air infiltration will not exceed 0.30 cfm/sf aperture with a pressure delta of 1.57 psf across the tube when tested in accordance with ASTM E283. b. Water Resistance Test: 1) Passes water resistance; no uncontrolled water leakage with a pressure differential of 10.7 psf (512 Pa) or 15 percent of the design load (whichever is greater) and a water spray rate of 5 gallons/hour/sf for 24 minutes when tested in accordance with ASTM E547 and ASTM E331. c. Uniform Load Test: All units tested with a safety factor of (3) for positive pressure and (2) for negative pressure, acting normal to plane of roof in accordance with ASTM E330. 1) No breakage, permanent damage to fasteners, hardware parts, or damage to make daylighting system inoperable or cause excessive permanent deflection of any section when tested at a Positive Load of 150 psf (7.18 kPa) or Negative Load of 70 psf (3.35 kPa). 2. Fire Testing: a. Fire Rated Roof Assemblies: 417 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -3 1) When used with the Dome Edge Protection Band, all domes meet fire rating requirements as described in the International Building Code for Class A, B, and C roof assemblies. b. When used with the Dome Edge Protection Band, all domes meet fire rating requirements as described in the International Building Code. c. Self-Ignition Temperature - Greater than 650 degrees F per ASTM D1929. d. Smoke Density: Rating no greater than 450 per ASTM E84 in way intended for use. Classification C. e. Rate of Burn and/or Extent: Maximum Burning Rate: 2.5 inches/min (62 mm/min) Classification CC-2 per ASTM D635. f. Rate of Burn and/or Extent: Maximum Burn Extent: 1 inch (25 mm) Classification CC-1 per ASTM D635. 3. Fall Protection Performance: a. Passes fall protection test: No penetration of dome or curb cap when subject to 400 lb (160 Kg)/42 inch (1066 mm) impact drop test when tested in accordance with OSHA 29 CFR 1926.506(c) Safety Net Systems. b. Passes fall protection test: California State OSHA Fall Protection Code of Regulations, Title 8, Section 3212 (e)(1) Skylight Screens. 1.5 SUBMITTALS A. Submit under provisions of Section 13 00 00. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Data sheets showing roof dome assembly, flashing base, reflective tubes, diffuser assembly, and accessories. 4. Installation requirements. C. Shop Drawings. Submit shop drawings showing layout, profiles, and product components, including rough opening and framing dimensions, anchorage, roof flashings and accessories. D. Electrical wiring diagrams and recommendations for power and control wiring. E. Test Reports: Independent testing agency or evaluation service reports verifying compliance with specified performance requirements. F. Provide manufacturer's standard catalog pages and data sheets including detailed information on luminaire construction, dimensions, ratings, finishes, mounting requirements, listings, service conditions, photometric performance, installed accessories, and ceiling compatibility; include model number nomenclature clearly marked with all proposed features: 1.6 QUALITY ASSURANCE A. Manufacturer Qualifications: All primary products specified in this section will be supplied by a single manufacturer with a minimum of twenty years experience in the top lighting industry. Secondary products shall be acceptable to the primary manufacturer. B. Installer Qualifications: All products shall be installed by a single installer with a minimum of five years demonstrated experience, with adequate equipment, skilled workers, and practical experience to meet the project schedule. For a list of qualified installers please contact Robert Busolo 760-597-4424 commsocalbusiness@solatube.com C. Skylights shall conform with authorities having jurisdiction and be designed to meet design 418 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -4 criteria of the project location and the following: 1. Skylights must be certified by NFRC. 2. Skylights must be Tested and labeled in accordance with AAMA/WDMA/CSA 101/I.S.2/A440. 3. Skylights must have Factory Mutual (FM) Approval Class Number 4431. 4. Meet or exceed OSHA 200 pound (90 kg) Drop Tests expressed in 29 CFR 1910.23(e)(8) 5. Skylights shall provide minimum 69 psf (3.30 kPa) design load. D. Pre-Installation Meeting: Contractor shall convene a pre-installation meeting on the project site minimum one week before beginning work of this Section. The meeting shall include the Architect or Owner's Representative and representatives of all related trades to: 1. Coordinate between the at least the following trades. a. Roofing to install the flashing, skylight, and LED Light Kit (when specified). Cut holes in roof deck, and flash curb to deck. b. Ensure clear paths for TDD units and coordinate with mechanical so not to interfere with pathways. c. Electrical to wire components and program lighting controls. 2. Verify project requirements and site logistics. 3. Assess integrity of the roofing system and building structure. 4. Review manufacturer's installation instructions and warranty requirements. 1.7 DELIVERY, STORAGE, AND HANDLING A. Deliver products in a cool dry location protected from the weather and in the manufacturer's original unopened containers until ready for installation. B. Store products in manufacturer's unopened packaging until ready for installation. 1.8 PROJECT CONDITIONS A. Coordinate delivery schedule with the Contractor and project schedule to minimize on site storage. B. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits. C. Store materials in a dry area, protected from freezing, staining, contamination or damage. 1.9 WARRANTY A. Daylighting Device: Manufacturer's standard warranty for 10 years. B. Electrical Parts: Manufacturer's standard warranty for 5 years, unless otherwise indicated. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturer: Solatube International, Inc., which is located at: Solatube International 2210 Oak Ridge Way; Vista, CA 92081-8341; Michelle Weisman Tel: (818) 577-9952; Email: (mweisman@solatube.com); Web:http://www.solatube.com B. Substitutions per 01 25 00. 419 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -5 2.2 TUBULAR DAYLIGHTING DEVICES A. Tubular Daylighting Devices General: Transparent roof-mounted skylight dome and self- flashing curb, reflective tube, and ceiling level diffuser assembly, transferring sunlight to interior spaces; complying with ICC AC-16. B. SolaMaster Series: Solatube Model 750 DS, 21 inch (530 mm) Daylighting System: 1. Model: a. Solatube Model 750 DS-O Open Ceiling. AAMA Type TDDOC. 2. Capture Zone: a. Roof Dome Assembly: Transparent, UV and impact resistant dome with flashing base supporting dome and top of tube. 1) Outer Dome Glazing: Type DA, 0.125 inch (3.2 mm) minimum thickness injection molded acrylic classified as CC2 material; UV inhibiting (100 percent UV C, 100 percent UV B and 98.5 percent UV A), impact modified acrylic blend. a) Raybender 3000: Variable prism optic molded into outer dome to capture low angle sunlight and limit high angle sunlight. 2) Acrylic Dome Plus Inner Dome Glazing: Type DPI, Inner Dome is 0.115 inch (3 mm) minimum thickness polycarbonate classified as CC1 material. b. Tube Ring: 0.090 inch (2.3 mm) nominal thickness injection molded ASA. Prevents thermal bridging between base flashing and tubing and channel condensed moisture. Attached to base of dome ring with butyl glazing rope 0.24 inch (6 mm) diameter; to minimize air infiltration. c. Dome Seal: Adhesive backed weatherstrip, 0.63 inch (16 mm) tall by 0.28 inch (7 mm) wide. 3. Flashings: a. Roof Flashing Base: 1) One Piece: One piece, seamless, leak-proof flashing functioning as base support for dome and top of tube. Sheet steel, corrosion resistant conforming to ASTM A653/A653M or ASTM A463/A463M or ASTM A792/A792M, 0.028 inch (0.7 mm) plus or minus .006 inch (.015 mm) thick. a) Base Style: Type FC, Curb cap, with inside dimensions of 27 inches by 27 inches (685 mm by 685 mm) to cover curb as specified in Section 07 60 00. b. Curbs: Metal Insulated Roof Curb: Corrosion resistant 18 Gauge hot-dipped galvanized steel conforming to ASTM A653 G90 with continuous welded seams, integrated base plate for water tightness and extra strength, lined with 1-1/2 inch fiberglass fireproof sound attenuating thermal insulation, factory installed 2 by 2 treated wood nailer secured to top ledge of curb. Curb designed for single-ply roofing, lightweight fill, or tapered insulation low slope roof types. 1) C12 12 inch (305 mm) high Metal insulated curb c. Flashing Options: 1) Curb Cap Insulation: Type CCI, Nominal 1 inch thick thermal insulation pad to reduce thermal conduction between curb-cap and tubing and thermal convection between room air and curb-cap. Rated R-6 (OFxft2xhr/Btu) Insulation is Polyisocyanurate foam utilizing CFC, HCFC, and HFC free blowing agent. Type-1 Class-1 per ASTM C 1289; Passes UL 1715 (15-minute thermal barrier per IBC 2603.4); Attic ventilation may be required per IBC 1203.2(OFxft2xhr/Btu). For use with Flashing Type FC. 4. Transfer Zone: 420 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -6 a. Extension Tubes: Aluminum sheet, thickness 0.018 inch (0.5 mm) conforming to ASTM B 209. 1) Reflective Tubes: a) Reflective extension tube, Type EXX and Type EL with total length of run as indicated on the Drawings. b) Interior Finish: Spectralight Infinity with INFRAREDuction Technology combining ultra-high Visible Light reflectance with Ultra-low Infrared (IR) reflectance. 2) Tube Options a) Wire Suspension Kit: Type E, Use the wire suspension kit when additional bracing to the structure is required. 5. Delivery Zone: a. Diffuser Assemblies for Tubes Not Penetrating Ceilings (Open Ceiling): Solatube Model 750 DS-O. 21 inch (530 mm) diameter diffuser attached directly to bottom of tube. 1) Lens: Type L2, Prismatic lens designed to maximize light output and diffusion. Visible Light Transmission shall be greater than 90 percent at 0.100 inch (2.5 mm) thick. Classified as CC2. 2) Diffuser Seal: Open cell foam, acrylic adhesive backed, 0.75 in (19 mm) wide by 0.125 in (3.2 mm) thick to minimize condensation and bug, dirt and air infiltration per ASTM E283. 3) Diffuser Trim Ring: Injection molded acrylic. Nominal wall thickness 0.172 inches (4.4 mm). b. Delivery Zone Options: 1) Daylight Dimmer - 0 to 10 V Dimmer Control: Provide an electrical actuator controller, auxiliary switches, and cable as specified in Section 26 05 00; Basic Electrical a) Low Voltage Daylight Dimmer: Type D1, is an Electro- mechanically actuated daylight valve; 0-10 V Control, Class-2, UL Listed. Low voltage Daylight Dimmer electrical actuator provides for programmable (0 to 10VDC) scene-based dimming control for daylight output between 2 and 100 percent, auxiliary 12VDC dimming control for daylight output between 2 and 100 percent, or auxiliary ON/OFF control. Input voltage: 24VAC at 50 or 60 Hz. 1) Programmable (0 to 10VDC) Control: requires an electrical actuator controller 2) Auxiliary 12VDC Dimming Control: Requires 12VDC Dimming Switch (Current Sourcing; 12VDC power supply not required). a) Requires CL-2 (Min), 18AWG, stranded copper, two conductor, twisted cable from lighting controller to first dimmer and interconnecting between subsequent dimmers 3) Auxiliary ON/OFF Control: requires commercial or residential single pole electric light switch. a) ON/OFF control requires CL-2 (Min), 22 AWG, stranded, three conductor, twisted cable from switch to first dimmer and CL-2 (Min), 18 AWG, stranded copper, two conductor twisted cable; interconnecting subsequent dimmers. b) Power can be transformed from line voltage through use of a UL Listed Class-2, 24VAC Transformer. 6. Accessories a. Low-voltage Transformer: Solatube Remote Transformer, Type TR20, is a 20VA, 24VAC, 50/60HZ, UL Listed, UL Category XOKV7, CE Marked, Class-2 421 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -7 Transformer with cover plate mounting system configured for easy field assembly onto standard 4.06 inch by 4.06 inch (103 mm by 103 mm) square junction box: Inherently Limited, Primary: 120VAC, 208VAC, 240VAC, and 277VAC. For use with Daylight Dimmer Type D1 only. b. Switch: Type S1, is a Low-voltage 0-10V Class 2 control switch (white) required to operate 0-10V Daylight Dimmer. Note: only one switch is required per set of up to 50 synchronously controlled dimmers. For use with 0-10V Daylight Dimmer, Type D1, only. 2.3 ACCESSORlES A. Fasteners: Same material as metals being fastened, non-magnetic steel, non-corrosive metal of type recommended by manufacturer, or injection molded nylon. B. Sealant: Polyurethane or copolymer based elastomeric sealant as provided or recommended by manufacturer. PART 3 EXECUTION 3.1 EXAMINATION A. Do not begin installation until substrates have been properly prepared. B. Examine openings, substrates, structural support, anchorage, and conditions for compliance with requirements for installation tolerances and other conditions. C. If substrate and rough opening preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding. 3.2 PREPARATION A. Clean surfaces thoroughly prior to installation. B. Coordinate requirements for power supply, conduit, and wiring. C. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. 3.3 INSTALLATION A. Install in accordance with manufacturer's printed instructions. B. Coordinate installation with substrates, air and vapor retarders, roof insulation, roofing membrane, and flashing to ensure that each element of the Work performs properly, and that finished installation is weather tight. 1. Install flashing to produce weatherproof seal with curb and overlap with roofing system termination at top of curb. 2. Provide thermal isolation when components penetrate or disrupt building insulation. Pack fibrous insulation in rough opening to maintain continuity of thermal barriers. 3. Coordinate attachment and seal of perimeter air and vapor barrier material. C. Where metal surfaces of tubular unit skylights will contact incompatible metal or corrosive substrates, including preservative-treated wood, provide permanent separation as recommended by manufacturer D. Align device free of warp or twist, maintain dimensional tolerances. 422 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 08 62 23 -8 E. Inspect installation to verify secure and proper mounting. Test each fixture to verify operation, control functions, and performance. Correct deficiencies. 3.4 FIELD QUALITY CONTROL A. Provide independent testing and inspection as specified in Section 01 45 23. Inspect installation to verify secure and proper mounting. 1. Test for water leaks in accordance with AAMA 502 after installation and curing of sealants but prior to installation if interior finishes. 2. Perform test for total area of each unit skylight. 3. Notify the Architect and the Contractor of any failed tests. 3.5 CLEANING A. Clean exposed surfaces according to manufacturer's written instructions. Touch up damaged metal coatings and finishes. Remove excess sealants, glazing materials, dirt, and other substances. 3.6 PROTECTION A. Protect installed products until completion of project. B. Touch-up, repair or replace damaged products before Substantial Completion. END OF SECTION 423 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 1 Gypsum Board Assemblies SECTION 09 21 00 GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide gypsum board systems including gypsum board, light gage metal framing, suspension system for gypsum board systems, joint treatment, acoustical accessories, and general accessories for complete installation. B. Related Sections: 1. Section 07 21 00: Building thermal insulation. 2. Section 07 84 00: Firestopping. 3. Section 09 30 00: Cementitious backer unit tile substrates. 1.2 REFERENCES A. ASTM C754: Installation of Steel Framing Members to Receive Screw-Attached Gypsum Wallboard, Backing Board, or Water-Resistant Backing Board. B. ASTM C840: Application and Finishing of Gypsum Board. 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination, Openings: Obtain dimensions and locations from other trades and provide openings and enclosures for accessories, specialties, equipment, and ductwork. 1.4 SUBMITTALS A. Product Data: Furnish manufacturer's literature for framing, insulation, gypsum board, and acoustical accessories. B. Manufacturer’s Certification: Furnish manufacturer's certification indicating products comply with Contract Documents and applicable codes. 1.5 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks. B. Level 4 Finish Mock-Up: Provide Level 4 finish mock-up not less than 100 square feet in location acceptable to Architect. Approved mock-up may be incorporated into Project. 1.6 PROJECT CONDITIONS A. Do not begin installation of interior gypsum board until space is enclosed, space is not exposed to other sources of water, and space is free of standing water. 424 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 2 Gypsum Board Assemblies B. Maintain areas to receive gypsum board at minimum 50-degree F for 48 hours prior to application and continuously after application until drying of joint compound is complete; comply with ASTM C840. C. Immediately remove from site gypsum board for interior use exposed to water, including gypsum board with water stains, with signs of mold, and gypsum board with mildew. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. National Gypsum Co. B. Georgia-Pacific Corp. C. United States Gypsum Co., USG Corp. D. Pabco E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide gypsum board assemblies including gypsum board, light gage metal framing, suspension system for gypsum board systems, joint treatment, acoustical accessories, and general accessories. 1. Systems Responsibility: Provide products manufactured by or recommended by manufacturer of gypsum board to maintain single-source responsibility for system. B. Performance Requirements: Perform gypsum board systems work in accordance with recommendations of ASTM C754 and ASTM C840 unless otherwise specified. 1. Loads: Comply with California Building Code requirements for design of metal framing for gypsum board systems. a. Deflection: Maximum L/240 typical, L/360 where tile is indicated. b. Deflection: Maximum L/240 typical, L/360 where tile or plaster are indicated. C. Regulatory Requirements: 1. Fire-Rated Assemblies: Provide systems listed in applicable code or by Underwriter's Laboratory, Gypsum Association (GA) File No's in GA-600 Fire Resistance Design Manual or other listing approved by applicable authorities. 2. Seismic Requirements: Comply with code requirements for seismic bracing. 425 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 3 Gypsum Board Assemblies D. Framing: Comply with ASTM C754, 20-gage and lighter unless otherwise indicated; provide gages as recommended by manufacturer for spans and loads indicated and as required by applicable codes. 1. Studs: ASTM C645, screw-type Cee-shaped. a. Shaft Walls: Cee-T or Cee-H shaped studs. b. Area Separation Walls: Match ClarkDietrich/H-Stud, Breakway Clips System. 2. Runners: Match studs. 3. Furring Members: ASTM C645, screw-type, hat-shaped. a. Sound Rated Assemblies: Provide resilient channels where indicated and where required to provide required sound transmission classifications. 1) Acceptable Manufacturers: a) USG/RC-1. b) ClarkDietrich/RC-Deluxe. c) Substitutions: Refer to Section 01 25 00. 4. Channels: ASTM C754. 5. Hangers: ASTM A641, Class 1 wire not less than sizes in Table No. 5 of ASTM C754 and as required by applicable codes; hanger rods, flat hangers, and angle-type hangers as required. 6. Suspension System: ASTM C635, suspension system composed of main beams and cross furring members interlocking to form supporting network; recommended by gypsum board system manufacturer. 7. Fasteners and Anchorages: As recommended by gypsum board system manufacturer. E. Gypsum Board: Comply with ASTM C840; maximum permissible lengths; ends square cut, tapered edges on boards to be finished. 1. Typical: ASTM C1396, Type X, fire rated gypsum board, unless otherwise indicated. a. Contractor may use non-type x at non rated conditions, at the contractor’s discretion. 2. First Layer at Double Layer Applications: ASTM C1396 or ASTM C442, Type X, fire rated gypsum backing board. 3. Gypsum Core Board/Gypsum Liner Board: ASTM C442, Type X, 1" thick; mildew and mold resistant. a. Gypsum Liner Board: Georgia Pacific/DensGlass Ultra Shaft Liner with ClarkDietrich/H-Stud 426 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 4 Gypsum Board Assemblies 4. Mold Resistant Gypsum Board: Provide at high humidity areas not covered with tile including but not limited to restrooms, janitorial areas. a. USG/Sheetrock Mold Tough Firecode Core. b. Georgia Pacific/ToughRock Mold-Guard Fireguard X. c. National Gypsum/Gold Bond XP Fire-Shield Gypsum Board. d. Substitutions: Refer to Section 01 25 00. 5. Tile Substrates: Cementitious backer units specified in Section 09 30 00 - Tiling. 6. Kevlar ballistic panels as indicated on drawings. Level 3 resistance. 7. Contractor Option Coated Glass Mat Backer Units: Georgia Pacific/DenShield, UL fire rated as required to maintain integrity of fire rated assemblies. 8. Standard Gypsum Sheathing: ASTM C1396, Type X, asphalt impregnated core with water resistant surfaces; plain back; square ends, V-tongue and groove long edges. 9. Sheathing: Silicone treated glass mat gypsum sheathing, ASTM C1177, Type X, 5/8” thick unless otherwise indicated. a. Manufacturers: 1) Georgia Pacific/DensGlass Gold. 2) Substitutions: Refer to Section 01 25 00. 10. Exterior Gypsum Soffit Board: ASTM C931, Type X; as recommended by manufacturer for exterior non-exposed applications. 11. Special High Rated STC Walls: Acoustically enhanced gypsum board designed with special layer of damping material sandwiched between two pieces of gypsum board for additional sound damping. a. National Gypsum/Soundbreak Gypsum Board. b. PABCO Quiet Rock 530 basis of design c. Georgia Pacific/ToughRock Sound Deadening Board. d. USG/Soundboard Drywall. e. Substitutions: Refer to Section 01 25 00. 12. Extended Exposure Gypsum Board: Fire rated Type X gypsum board designed specifically for extended exposure to moisture during construction; ASTM C1177; provide with score of 10 when tested using ASTM D3273 for mold resistance. a. National Gypsum/eXP Extended Exposure Sheathing. b. Georgia Pacific/DensArmor Plus or DensGlass. c. USG/Sheetrock Fiberock Aqua Tough Sheathing. d. Substitutions: Refer to Section 01 25 00. 427 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 5 Gypsum Board Assemblies F. Gypsum Board Accessories: Comply with ASTM C840. 1. Provide protective coated steel corner beads and edge trim; type designed to be concealed in finished construction by tape and joint compound. 2. Corner Beads: Manufacturer's standard metal beads. 3. Edge Trim: “J”, "L", "LK", or "LC" casing beads. 4. Reinforcing Tape, Joint Compound, Adhesive, Water, Fasteners: Types recommended by system manufacturer and conforming to ASTM C475. a. Typical Joint Compound: Chemical hardening type for bedding and filling, ready-mixed or powder vinyl type for topping. 5. Control Joints: Back to back casing beads. a. Back control joints with 4 mil thick polyethylene air seal. 6. Reveals: Extruded aluminum special trim pieces in manufacturer's standard or custom shapes to conform to configurations and dimensions indicated. a. Manufactures: 1) Fry Reglet Corp./Drywall Moldings. 2) Gordon Inc./Final Forms I Drywall Trims. 3) Substitutions: Refer to Section 01 25 00. G. Acoustical Accessories: Provide as indicated and as required to achieve acoustical ratings indicated. 1. Acoustical Insulation: Preformed mineral fiber, ASTM C665, Type I; friction fit type without integral vapor barrier; as required to meet STC ratings indicated, or of thickness indicated. 2. Acoustical Sealant: ASTM C919, type recommended for use in conjunction with gypsum board. Paintable, non-shrinking and non-cracking where exposed, nondrying, nonskinning, nonstaining, and nonbleeding where concealed. a. Acoustical Sealant Manufacturers: 1) USG/Sheetrock Acoustical Sealant. 2) Tremco/Acoustical Sealant. 3) Pecora/AC-20. 4) Quiet Rock sealants 5) Substitutions: Refer to Division 1. 428 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 6 Gypsum Board Assemblies 3. Electrical Box Pads: Provide at outlet, switch and telephone boxes in walls with acoustical insulation. a. Electrical Box Pad Manufacturers for Non-Fire Rated Partitions: 1) Harry A. Lowry & Associates (800.772.2521)/Lowry's Electrical Box Pads. 2) Tremco Sheet Caulking (650.572.1656). 3) Fire rated partition material manufacturers. 4) Substitutions: Refer to Section 01 25 00. b. Electrical Box Pad Manufacturers for Fire Rated Partitions: 1) Hevi-Duty Nelson (800.331.7325)/Fire Rated FSP Firestop Putty Pads. 2) Specified Technologies, Inc. (800.992.1180)/Fire Putty Pads. 3) Hilti, Corp./Hilti Box Pads. 4) Substitutions: Refer to Section 01 25 00. H. Fire Rated Assembly Accessories: Provide materials and accessories as required to comply with fire rating requirements of UL, GA or other listing approved by applicable authorities. PART 3 - EXECUTION 3.1 INSTALLATION A. Metal Framing Erection: Erect metal framing in accordance with ASTM C754 and manufacturer's recommendations. 1. Install members true to lines and levels to provide surface flatness with maximum variation of 1/8" in 10'-0" in any direction. 2. Door Opening Framing: Install double studs at door frame jambs; install runners on each side of opening at frame head height between jamb studs and adjacent studs. 3. Install metal framing backing where required for support of fixtures, cabinets, accessories and hardware. 4. Coordinate installation of bucks, anchors, blocking, electrical and mechanical work which is to be placed in or behind partition framing; allow items to be installed after framing is complete. B. Ceiling Framing Installation: Erect in accordance with ASTM C754 and manufacturer's recommendations. 1. Coordinate location of hangers with other work; provide trapeze supports and steel bracing as required to support ceiling. 2. Install ceiling furring independent of walls, columns, and above-ceiling work. 3. Space main carrying channels at maximum 48" on center, not more than 6" from perimeter walls. 429 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 7 Gypsum Board Assemblies a. Lap splices minimum 12" and secure together 2" from each end of splice. 4. Place furring channels perpendicular to carrying channels at maximum 24" on center and not more than 2" from perimeter walls. 5. Lap splices minimum 8" and secure together 2" from each end of splice. 6. Reinforce openings in ceiling suspension system which interrupt main carrying channels or furring channels, with lateral channel bracing; extend bracing minimum 24" past each end of openings. 7. Laterally brace entire suspension system. C. Gypsum Board Installation: Install in accordance with ASTM C840 and manufacturer's recommendations. 1. Use screws when fastening gypsum board to furring and to framing. 2. Erect gypsum board with ends and edges occurring over firm bearing. a. Ensure joints of second layer do not occur over joints of first layer in double layer applications. 3. Place control joints to be consistent with lines of building spaces and as directed by Architect. a. Provide where system abuts structural elements. b. Provide at dissimilar materials. c. Lengths exceeding 30'-0" in partitions. d. Ceiling areas exceeding 50'-0" or 2500 square feet. e. Wings of "L", "U" and "T" shaped ceilings. 4. Place corner beads at external corners; use longest practical lengths. 5. Place edge trim where gypsum board abuts dissimilar materials. 6. Tape, fill, and sand exposed joints, edges, corners and openings to produce surface ready to receive finishes; feather coats onto adjoining surfaces. 7. Finishing: Comply with Gypsum Association (GA) “Levels of Gypsum Board Finish”. a. GA Level 4 (Typical): Provide three-coat finishing and sanding is required for surfaces indicated to be painted; provide flush, smooth joints and surfaces ready for applied paint finishes. b. Above ceilings at full height walls: tape gypsum board joints. Provide acoustical sealants at penetrations. 8. Remove and replace defective work at contractor’s expense. 430 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 21 00 - 8 Gypsum Board Assemblies D. Acoustical Accessories Installation: 1. Place acoustical insulation tight within spaces, around cut openings, behind and around electrical and mechanical items within partitions, and tight to items passing through partitions. 2. Place acoustical sealant within partitions in accordance with manufacturer's recommendations; install acoustical sealant at gypsum board perimeter at: a. Metal Framing: One or two beads. b. Base layer and face layer. c. Penetrations of partitions. 3. Tolerance: Maximum 1/4" space between gypsum board at floor, ceiling, and penetrations and sealed with acoustical sealant. 4. Install electrical box pads with pads molded and pressed on back and all sides of box, closing openings, in accordance with manufacturer's instructions, for complete acoustical barrier. END OF SECTION 431 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 24 00 - 1 Portland Cement Plaster SECTION 09 24 00 PORTLAND CEMENT PLASTER PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Stucco: Provide three-coat Portland cement plaster (stucco) with rainscreen, metal lath, and accessories as required for complete finished system. B. Related Sections: 1. Section 07 28 00: Weather barrier underlayment. 2. Section 05 40 00 Cold Formed Metal Framing 3. Section 09 90 00: Painting of stucco. 1.2 REFERENCES A. ASTM C926: Application of Portland Cement Based Plaster. B. ASTM C1063: Installation of Lathing and Furring for Portland Cement Plaster. 1.3 SUBMITTALS A. Product Data: Submit manufacturer's product information for each lathing material and accessory, and for plaster materials. B. Shop Drawings: Indicate locations of control and expansion joints where not shown on Drawings. C. Samples: Furnish 24” by 24” stucco samples using materials and methods specified including lath. 1.4 QUALITY ASSURANCE A. Mock-Ups: Provide not less than 100 sf mock-up of each type of plaster; approved mock-ups may be incorporated into Project. 1.5 SITE CONDITIONS A. Take precautionary measures to ensure plaster is not subjected to excessive sun and wind which could cause uneven and excessive evaporation, premature dehydration, or cracking. B. Cold-Weather Requirements: Do not apply plaster unless minimum ambient temperature of 40 degrees F has been and continues to be maintained for minimum 48 hours prior to application and until plaster is cured. 432 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 24 00 - 2 Portland Cement Plaster PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide three coat Portland cement plaster (stucco), with metal lath and accessories. B. Regulatory Requirements: Comply with applicable codes. C. Portland Cement Plaster: Provide either ready-mixed materials unless otherwise approved in writing by Architect, complying with ASTM C926. 1. Scratch and Brown Coat Materials: a. Cement: Normal Type 1 or 1A Portland cement, ASTM C150. b. Hydrated Lime: Special finishing hydrated lime, Type S, ASTM C206. c. Aggregate: Natural sand, conforming to ASTM C897 or C144. 2. Brown Coat Water Acrylic Admix: Acrylic polymer specifically manufactured for use in Portland Cement Plaster (Stucco) applications and which will not detrimentally affect finish. a. Manufacturers: 1) Larsen Products Corp/Acrylic Admix 101. 2) BASF/Thoro Acryl 60. 3) Chem-Masters Corp/Cretelox. 4) Substitutions: Refer to Section 01 25 00. 3. Proprietary Finishing Materials: Provide proprietary acrylic based factory mixed integral color finishing materials as indicated and as approved by Architect. a. Manufacturers: 1) Omega Products Corp./Akroflex – Multitex Texture (Basis of Design) 2) La Habra Products, Inc./DPR Acrylic Finish. 3) Senergy, Inc./Acrylic Finish. 4) Sto Corp./Stolit. 5) Substitutions: Refer to Section 01 25 00. b. Colors: Provide 12 Chenille, basis of design. 4. Water: Clean, fresh and free from injurious amounts of oil, acid, alkali, organic matter or other deleterious substances. 5. Bonding Agent: Conform to ASTM C932. 433 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 24 00 - 3 Portland Cement Plaster a. Manufacturers: 1) Larsen Products Corp./Weld-Crete. 2) BASF/Thorobond. 3) Chem-Masters Corp./Polyweld. 4) Substitutions: Refer to Section 01 25 00. B. Metal Components: Comply with requirements of ASTM C1063. 1. Manufacturers: a. Phillips Manufacturing Company b. Alabama Metal Industries Corp (AMICO). c. ClarkDietrich Building Systems. d. Substitutions: Refer to Section 01 25 00. 2. Exterior Components: Hot-dip galvanized finish; ASTM A924 and A653 minimum G90 for 18 gage and lighter formed metal products, ASTM A123 galvanized after fabrication for 16 gage and heavier products. a. Exposed Exterior Components: Zinc accessories unless fully concealed in plaster. 3. Exterior Metal Lath: Galvanized expanded diamond mesh; minimum 2.5 psy at vertical applications, 3.4 psy at horizontal applications. a. Backing: Weather resistive barrier system specified in Section 07 28 00 – Weather Barrier/Underlayment. b. Self-Furring: Where over solid substrate, provide “V” groove type to hold lath approximately 1/4" from supporting base. c. Tie Wire: ASTM A641, soft temper, Class 1 zinc coated; minimum 16 gage for tying metal lath to furring channels and metal lath to metal lath. 4. Inside Corner Mesh: Minimum 26-gage steel; perforated or expanded flanges or clips shaped to permit complete embedding in plaster; minimum 2" by 2" size. C. Accessories: Provide as indicated, as recommended by referenced standards, and as required for complete installation. 1. Manufacturers: a. Keene Products from Metalex, a Division of The Koller Group. b. Delta Star, Inc., Superior Metal Trim. c. Brand X Metals. d. Lath manufacturers. e. Substitutions: Refer to Section 01 25 00. 2. Casing Beads and Base Screeds: Minimum 26-gage, square edges at casing beads, drip type base screeds; provide with expanded flanges. 434 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 24 00 - 4 Portland Cement Plaster 3. Expansion Joints: Two-piece slip type joints; commonly referred to as No. 40. 4. Control Joints: One-piece metal joint designed to interlock with plaster similar to Keene/XJ15-3. 5. Aluminum Vent Strips and Channel Screeds: Extruded aluminum alloy 6063 and temper T5 or T6, minimum 0.05" thick; with manufacturer's standard baked-on finish. a. Manufacturers: 1) Fry Reglet Corp./Plaster Moldings. 2) Gordon Inc./Final Forms II. 3) Substitutions: Refer to Section 01 25 00. b. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. D. Anchorages: Tie wire, nails, screws and other approved metal supports, of type and size to suit application. 1. Staples not permitted. 2.2 PLASTER MIXES A. Provide plaster mixes in accordance with ASTM C926 as appropriate to the substrate indicated and the approved samples. B. Mix only as much plaster as can be used in one hour. C. Mix materials dry, to uniform color and consistency, before adding water. D. Protect mixes from frost, dust and evaporation. E. Do not retemper mixes after initial set has occurred. PART 3 - EXECUTION 3.1 PREPARATION A. Prior to application ensure mechanical and electrical services behind surfaces to receive cement plaster have been tested and approved. B. Ensure framing has been properly installed and rigidly secured. 3.2 INSTALLATION A. Erect furring and lath in accordance with ASTM C1063. B. Install work true to lines and levels and to provide surface flatness with maximum variation of 1/8" in 10'-0" in any direction. 435 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 24 00 - 5 Portland Cement Plaster C. Isolation: Isolate lathing and metal support system where it abuts building structure horizontally, and where partition/wall work abuts overhead structure, to prevent transfer of building loads into plaster. 1. Install slip or cushion type joints to absorb deflections but maintain lateral support. D. Frame both sides of expansion joints independently unless otherwise indicated, do not bridge joints with furring and lathing or accessories. E. Fixture Support Framing: Install supplementary framing, blocking and bracing where work is indicated to support fixtures, equipment, services and similar work requiring attachment and support. F. Coordinate installation of anchors, blocking, electrical and mechanical work which is to be placed in or behind framing; allow such items to be installed after framing is complete. G. Install expansion and control joints so plaster areas do not exceed 120 ft2, and with area sides having a maximum one to two and a half (1:2-1/2) ratio, unless otherwise approved by Architect. H. Metal Lathing: Apply lath taut, with long dimension perpendicular to supports; secure end laps with tie wire where they occur between supports; lap ends minimum 1" and sides 1/2”; secure with tie wires. 1. Continuously reinforce internal angles. 2. Place 6" wide x 12" long strips of metal lath diagonally at corners of openings; secure rigidly in place. 3. Place 6" wide strips of metal lath at junctions of dissimilar materials; place parallel with dissimilar materials; secure rigidly in place. I. Installation of Metal Accessories: 1. Fasten in place true to line and in correct relation to adjacent materials and as required to prevent dislodging and misalignment by subsequent operations. 2. Fasten at both ends and at maximum 12" on center along sides. 3. Bring grounding edge of accessories to true lines, plumb, level, and straight. 4. Install accessories to provide required depth of plaster and to bring plaster surface to required plane. 5. Install continuous corner reinforcement for full length of external corners. 6. Install sill and drip screeds with paper sheathing and lath installed over attachment flange of screeds. 7. Beads: Use single length of metal beads wherever length of run does not exceed longest standard stock length available; miter or cope corners. 436 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 24 00 - 6 Portland Cement Plaster a. Provide casing beads where plaster abuts dissimilar construction and at perimeter of openings where edges of plaster will not be concealed by other work. J. Portland Cement Plaster: Conform to ASTM C926. 1. Stucco: Apply three coat cement plaster system, scratch, brown, and finish coats. 2. Base for Surface Bonded Masonry: Apply two coat cement plaster system, scratch and brown coats. 3. Apply each base coat (scratch and brown) to minimum thickness of 3/8"; allow each coat to moist cure for minimum period of 48 hours; a. Moist cure first base coat (scratch coat) during 48-hour period. 4. Allow base coats to cure for minimum 7 days prior to application of finish coat. 5. Evenly dampen base coat, to ensure uniform suction, and apply finish coat; apply thickness sufficient to secure required texture but in no case less than 1/8". a. Apply pre-mixed finish coat in accordance with manufacturer's recommendations. 6. Maintain surface flatness, with maximum variation of 1/8" in 10'-0". 7. Avoid excessive working of surface, delay troweling to avoid drawing excess fines to surface. K. Finish: Provide surfaces with finish to match approved sample panel and mock-up. 3.3 CUTTING AND PATCHING A. Cut, patch, point, and repair plaster as necessary to accommodate other work and to restore cracks, dents, and imperfections. B. Repair or replace work to eliminate blisters, buckles, crazing, check cracking, dry- outs, efflorescence, sweat-outs, and similar defects. C. Finish cutting and patching to match undamaged plaster; patching shall not be visible in finished installation. 3.4 CLEANING A. Promptly remove plaster from surfaces not indicated to be plastered. B. Repair surfaces stained, marred or otherwise damaged during plastering. END OF SECTION 437 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 30 00 - 1 Tiling SECTION 09 30 00 TILING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide tile installations with accessories, as required for complete installation. 1. Provide cementitious backer unit tile substrate. B. Related Sections: 1. Section 09 21 00: Metal framing and gypsum board. 1.2 REFERENCES A. ANSI A108.1: Installation of Tile with Portland Cement Mortar. B. ANSI A108.5: Installation of Tile with Latex-Portland Cement Mortar. C. ANSI A108.10: Installation of Grout in Tilework. D. ANSI A108.11: Interior Installation of Cementitious Backer Units. E. Tile Council of North America (TCNA): Handbook for Ceramic Tile Installation. 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination, Large Format Tile and Framing: Tile Council of North America (TCNA) requires framing at large format tile to be maximum 16” on center and for maximum deflection of L/720 where large format tile as defined by TCNA is indicated. 1. Coordinate with framing installation to ensure proper stud spacing and deflection limits are provided at locations where large format tile is indicated. 1.4 SUBMITTALS A. Product Data: Furnish manufacturer's literature for each type of material for Project. B. Samples: Furnish each type of tile clearly indicating pattern, coloration and joints. 1. Color Charts: Submit actual tile sections showing full range of colors, textures and patterns available for each type of tile. 2. Prepare two 12" square sample panels of each selected type of tile and grout. 438 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 30 00 - 2 Tiling 1.5 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks. 1.6 SITE CONDITIONS A. Provide heat and ventilation in areas where ceramic tile work is being performed, to allow tile to properly set. B. Take precautionary measures necessary to ensure excessive temperature changes do not occur. 1.7 WARRANTY A. Extended Correction Period: Provide for correcting failure of system to resist water penetration except where failure is result of structural failure of building. Repair system and pay for or replace damaged materials and surfaces. 1. Hairline cracking due to temperature or shrinkage is not considered structural failure. 2. Period: Two years. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide tile installations with tile, grout, setting materials, and accessories as indicated. B. Regulatory Requirements, Slip-Resistance: 1. Slip-Resistant Hard Surfaces: Hard surface finishes to comply with requirements of authorities having jurisdiction for slip-resistant hard surfaces, including general code requirements and requirements for access for persons with disabilities. C. Tile: Types as indicated on finish schedule 1. Manufacturers: a. Manufacturers listed on Finish Schedule. b. Substitutions: Refer to Section 01 25 00. 2. Color, Style and Pattern: As indicated on Finish Schedule 3. Base and Trim: Provide matching trim pieces, coordinated with sizes and coursing of adjoining flat tile. 439 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 30 00 - 3 Tiling D. Portland Cement Setting Bed: Portland cement bed conforming to ANSI A108.1 and TCNA recommendations including separator sheet and reinforcing mesh. 1. Separator sheet may be deleted where over waterproof membrane. E. Latex Thin Set: Thinset bond coat, consisting of latex-cementitious mortar conforming to ANSI A118.4. 1. Manufacturers: a. Laticrete International Inc. b. Bostik Construction Products/Hydroment. c. Custom Building Products. d. Mapei Corp. e. Parex USA/Mer-Krete. f. Substitutions: Refer to Section 01 25 00. F. Latex-Cement Grout: ANSI A118.7, latex-cementitious type, uniform in color, resistant to shrinkage. 1. Manufacturers: a. Laticrete International Inc. b. Bostik Construction Products/Hydroment. c. Custom Building Products. d. Mapei Corp. e. Parex USA/Mer-Krete. f. Substitutions: Refer to Section 01 25 00. 2. Colors: Per Finish Schedule G. Cementitious Backer Units: ANSI A118.9 aggregated Portland cement with woven glass-fiber mesh on both faces. 1. Manufacturers: a. USG Industries, Durabond Division/Durock. b. National Gypsum Co./PermaBase Cement Board. c. Custom Building Products/Wonderboard. d. Substitutions: Refer to Section 01 25 00. 2. Contractor Option Coated Glass Mat Backer Units: Georgia Pacific/DenShield, UL fire rated as required to maintain integrity of fire rated assemblies. H. Cleaning and Sealing Materials: As recommended by tile and grout manufacturers, such as Bostik Construction Products/Hydroment CeramaSeal. 440 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 30 00 - 4 Tiling A. Special Tile Trim Pieces: Provide as indicated on Drawings. 1. Manufacturers: a. Schluter Systems L.P. b. Substitutions: Refer to Section 01 25 00. 2.2 MIXES A. Mix and proportion cementitious materials for site-made leveling coats, setting beds and grout as recommended by the TCNA Handbook for Ceramic Tile Installation. B. Mix and proportion pre-mixed setting beds and grout materials in accordance with manufacturer's recommendations. PART 3 - EXECUTION 3.1 PREPARATION A. Prior to installing tile, ensure surfaces are level; comply with TCNA and tile manufacturer recommendations but not greater than following. 1. Bed Set Tile Tolerance: Maximum surface variation of 1/4" in 10'-0". 2. Thin Set Tile Tolerance: Maximum surface variation of 1/8" in 10'-0". B. Ensure surfaces are clean and well cured. 1. Drains: Where indicated, ensure surfaces are properly sloped to drains. C. Do not commence work until surface conditions are within tolerances required for proper installation; apply latex leveling material where necessary to meet required tolerances. D. Waterproof and Crack Isolation Membrane: Install waterproof membrane at tile areas located above grade, in accordance with manufacturer's recommendations; extend membrane minimum 6" up walls. 1. Comply with waterproof membrane manufacturer recommendations for installation of tile over waterproof membrane. E. Backer Units: Install units in accordance with ANSI A108.11, manufacturer's recommendations, and as required to provide fire ratings indicated on Drawings. 441 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 30 00 - 5 Tiling 3.2 INSTALLATION A. Install tile in accordance with referenced ANSI Standards and TCNA recommendations for type of substrate and indicated setting method. 1. Complexity of TCNA variations in types of tile installation systems and potential for changes to surrounding conditions during design and construction makes exact listing of potential conditions improbable. 2. Contractor, installers, and manufacturer representatives shall inform Architect where actual conditions are not covered and where providing similar materials and systems do not comply with TCNA or manufacturer recommendations. a. Where specified or similar materials and systems do not comply with TCNA or manufacturer recommendations submit proposed substitutions along with statement substitutions are of comparable quality to specified materials. B. Following systems shall form the basis of tile installation systems required for Project. Where Project conditions vary from TCNA and manufacturer recommendations, notify Architect immediately. Where different use similar materials and systems as appropriate. 1. Latex-Cement Thin Set Floors over Concrete: TCNA F113. 2. Latex-Cement Thin Set Floors over Waterproof and Crack Isolation Membrane: TCNA F122. 3. Latex-Cement Thin Set Floors over Acoustic Underlayment: TCNA F122. 4. Latex-Cement Thin Set Floors over Cementitious Backer Unit over Wood: TCNA F144. 5. Latex-Cement Thin Set Wall Tile over Cementitious Backer Units: TCNA W244. 6. Latex-Cement Thin Set Wall Tile over Coated Glass Mat Backer Units: TCNA W245. C. Place tile in accordance with patterns indicated on Drawings or as directed by Architect; carefully plan tile layouts, ensure pattern is uninterrupted from one surface to the next and through doorways. 1. Apply latex thin set to back of tile where necessary to ensure 100% bond between bond coat and substrate; replace tiles which break due to voids between tile and substrate. D. Neatly cut tile around fixtures and drains; accurately form corners, base, intersections and returns. 1. Base, Coves: Flush cove type with base grout joint on wall, cove tile on floor, unless otherwise indicated. 2. Corners and Edges: Bullnose tile unless otherwise indicated. 442 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 30 00 - 6 Tiling E. Locate expansion joints, control joints, contraction joints, and isolation joints where indicated; where not indicated, provide as recommended by TCNA Handbook and as approved by Architect. 1. Install special trim pieces as indicated on Drawings and in accordance with manufacturer recommendations and installation instructions, true to lines and levels indicated and in correct relationship with tile and adjacent materials. F. Ensure tile joints are uniform in width, subject to normal variance in tolerance allowed in tile size; ensure joints are watertight, without voids, cracks, excess mortar or grout. G. Sound tile after setting, remove and replace hollow sounding units at contractor’s expense. H. Allow tile to set for a minimum 48 hours prior to grouting. I. Grout tile to comply with recommendations of TCNA and as specified. J. Leave completed installation free of broken, damaged and faulty tile. 3.2 CLEANING AND SEALING A. Clean tile surfaces free of foreign matter upon completion of grouting. B. Seal tile and grout surfaces where recommended by manufacturer for materials and applications involved; comply with manufacturer's recommendations. END OF SECTION 443 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 51 00 - 1 Acoustical Ceilings SECTION 09 51 00 ACOUSTICAL CEILINGS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide suspended acoustical ceiling system with exposed suspended metal grid system, trim, and accessories as required for complete finished installation. B. Related Sections: 1. Section 09 21 00: Gypsum board suspended ceiling systems. 2. Divisions 21 through 28: Facilities services for ceiling penetrations. 1.2 REFERENCES A. ASTM C635: Metal Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings. B. ASTM C636: Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings. C. ASTM E580: Application of Ceiling Suspension Systems for Acoustical Tile and Lay- In Panels in Areas Requiring Seismic Restraint. 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination: Coordinate installation of acoustical ceiling systems with items installed above ceilings to ensure work above ceilings is complete, ceiling space allows for concealed items while allowing required ceiling heights, and building is enclosed. 1.4 SUBMITTALS A. Product Data: Furnish manufacturers' literature. B. Shop Drawings: Clearly indicate grid layout and related dimensioning, junctions with other work and ceiling finishes, and inter-relation of mechanical and electrical items related to system. C. Samples: Furnish samples of exposed grid finish and each type of ceiling unit. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Firm with minimum five years successful experience in projects of similar type and scope; acceptable to manufacturer of integrated acoustical ceiling system. 444 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 51 00 - 2 Acoustical Ceilings 1.6 SITE CONDITIONS A. Do not install ceilings until building is enclosed, sufficient heat is provided, dust generating activities have terminated and overhead mechanical work is completed, tested and approved. 1. Do not allow acoustical ceiling units to be exposed to moisture; immediately remove acoustical ceiling units with stains, units with signs of mold, and units with mildew. B. Allow wet work to dry prior to commencement of installation. C. Maintain uniform temperatures of minimum 60 degrees F and humidity of 20% to 40% prior to, during and after installation. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Armstrong World Industries, Inc. B. CertainTeed. C. USG Corporation. Basis of Design. D. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide acoustical ceiling systems with exposed suspended metal grid system, trim, and accessories as required for complete finished installation. B. Regulatory Requirements: 1. Seismic Design Requirements: Comply with California Building Code requirements for seismic bracing of ceiling suspension system, and with ASTM E580. a. Ceiling Struts: Provide struts as detailed on Drawings and as required by code, placed maximum 12'-0" on center in both directions and within 6'-0" of each wall. b. Slack Wires: Provide safety slack wires, two per fluorescent fixture on diagonally opposite corners and a single wire for each recessed down light. 2. Fire Performance Characteristics: Provide products listed by Underwriters Laboratories (UL) or other independent testing laboratory acceptable to applicable authorities. a. Flame Spread/Smoke Density: Provide products meeting code requirements for maximum 25 flame spread and maximum 450 smoke developed. 445 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 51 00 - 3 Acoustical Ceilings C. Suspension Systems: Comply with ASTM C635, as applicable to type of suspension system required for type of ceiling units indicated. 1. Grid System: a. Exposed Grid System: Standard 1" nominal face width, direct hung, aluminum or steel "T" exposed grid system. 2. Attachment Devices: Size for 5 times design load indicated in ASTM C635, Table 1, Direct Hung. 3. Hanger Wires: Galvanized carbon steel, ASTM A641, soft temper, pre-stretched, yield-stress load of at least three times design load, but not less than 12-gage. 4. Straps, Tubes and Angles: Provide galvanized steel as required to meet state and local requirements for seismic design loads. 5. Structural Class: Minimum intermediate-duty system. 6. Edge Molding: Manufacturer's standard angle molding for edges and penetrations of ceiling, with single flange of molding exposed. 7. Finish of Exposed Items: Manufacturer's standard white baked enamel. 8. Maximum Allowable Deflection: L/360. D. Acoustical Panels: ASTM E1264 type and form as indicated on Finish Schedule, as selected by Architect from manufacturer’s full range of panels where not otherwise indicated. 1. Panels: 2. As indicated at council chamber: USG Geometrix, 2’-0” x 2’-0”, profiled diffusion tile or approved equal. 3. Typical tile: USG Mars, White, 2’-0” x 2’-0” , NRC .90, or approved equal a. Shadowline tapered edge profile 4. Size: 2'-0" by 2'-0", unless otherwise indicated on Drawings. 5. Colors: white. PART 3 - EXECUTION 3.1 PREPARATION A. Furnish layouts for inserts, clips and other supports required to be installed by other trades for support of acoustical ceilings. 1. Install inserts, clips, and supports where not previously installed and where additional supports are required for complete installation. 446 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 51 00 - 4 Acoustical Ceilings B. Measure ceiling area and establish layout of acoustical units to balance border widths at opposite edges of each ceiling; do not use less than half width units at borders. C. Coordinate with other work supported by or penetrating through ceilings, including integral air handling systems, light fixtures, and other systems. 3.2 INSTALLATION A. Install acoustical ceiling systems in accordance with manufacturer's recommendations and ASTM C636. 1. Coordinate installation of air handling systems and electrical systems integral with integrated acoustic ceiling systems. 2. Finished Ceilings: True to lines and levels and free from warped, soiled or damaged grid or acoustical units. B. Install ceiling systems in a manner capable of supporting superimposed loads, with maximum permissible deflection of 1/8" in 10'-0". C. Install after major above-ceiling work is complete; coordinate location of hangers with other work. 1. Ensure suspension system is located to accommodate fittings and units of equipment which is to be placed after installation of ceiling grid. D. Where ducts or other equipment prevent regular spacing of hangers, reinforce nearest adjacent hangers and related carrying channels as required to span required distance. E. Install ceiling suspension system to resist seismic loads as required by state and local codes, including extra hanger wires and compression supports for ceilings and light fixtures. F. Hang system independently of walls, columns, ducts, pipes and conduit. Where suspension system members are spliced, avoid visible displacement of the longitudinal axis or face plane of adjacent members. G. Do not support lighting fixtures from or on main runners or cross runners if weight of fixture causes total dead load to exceed deflection capability. 1. Support fixture loads independently or provide supplementary hangers located within 6" of each corner. H. Do not install fixtures so main runners and cross runners are eccentrically loaded; where fixture installation would produce rotation of runners, provide stabilizer bars. I. Install edge moldings at intersection of ceiling and vertical surfaces, using maximum lengths, straight, true to line and level; miter corners. 1. Provide edge moldings at junctions with other ceiling finishes. 447 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 51 00 - 5 Acoustical Ceilings J. Where required form expansion joints to accommodate movement and maintain visual closure without distorting system. K. Fit acoustic units in place, free from damaged edges or defects detrimental to appearance and function. 1. Lay directionally patterned units one way with pattern as directed. 2. Fit border units neatly against abutting surfaces. L. Install system level, in uniform plane and free from twist, warp and dents. M. Install hold-down clips where required by applicable codes and where ceiling is within 20'-0" of an exterior door. 3.3 ADJUSTING A. Adjustment: Adjust sags or twists which develop in ceiling system and replace any part which is damaged or faulty at contractor’s expense. END OF SECTION 448 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 65 10 - 1 Resilient Base SECTION 09 65 10 RESILIENT BASE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide resilient base and accessories as required for complete finished installation. B. Related Sections: 1. Section 09 68 00: Carpet edge strips. 2. Section 09 68 10: Carpet tile edge strips. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer's product literature. B. Samples: Furnish samples of each base color and type. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives and resilient flooring. 1.4 SITE CONDITIONS A. Comply with manufacturer recommendations for site conditions but not less than following; maintain minimum 70-degree F air temperature at installation area for three days prior to, during, and for 24 hours after installation. B. Store materials in area of application; allow three days for material to reach same temperature as area. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Johnsonite, Inc. B. Burke Flooring, Division of Burke Industries. C. Roppe Rubber Corporation. D. Tarkett E. As indicated on finish plan/schedule. F. Substitutions: Refer to Section 01 25 00. 449 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 65 10 - 2 Resilient Base 2.2 MATERIALS A. System Description: Provide resilient base and accessories as required for complete finished installation. B. Performance Requirements: Provide materials tested under ASTM E648, Flooring Radiant Panel Test, with results of 0.45 watts/sq. cm or higher. C. Resilient Base: Conform to ASTM F1861, with premolded end stops and external corners; 1/8" gage; provide coved base at hard floor surfaces, straight base at carpet unless otherwise indicated. 1. Type: Molded rubber, available in 4’ lengths. 2. Type: Extruded rubber, in rolls. 3. Type: Vinyl base. 4. Height: 4" unless otherwise indicated. 5. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. D. Primers and Adhesives: Water-resistant nontoxic types recommended by base manufacturer for specified material and application. PART 3 - EXECUTION 3.1 INSTALLATION A. Apply to walls, columns, pilasters, casework, and areas where base is required. 1. Fit base joints tight and vertical. 2. Maintain minimum measurement of 18" between joints. B. Miter internal corners; use molded sections for external corners and exposed ends. C. Install base on solid backing, adhere tightly to wall and floor surfaces; fill voids along top edge of base with manufacturer's recommended adhesive filler. D. Scribe and fit to door frames and other obstructions. E. Install straight and level to variation of plus or minus 1/8" over 10'-0". 3.2 CLEAN-UP A. Remove excess adhesive from floor, base and wall surfaces without causing damage. B. Clean surfaces in accordance with manufacturer's recommendations. END OF SECTION 450 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 65 20 - 1 Resilient Tile Flooring SECTION 09 65 20 RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide resilient tile flooring and accessories as required for complete finished installation. B. Related Sections: 1. Section 09 65 10: Resilient base. 2. Section 09 68 00: Carpet edge strips. 3. Section 09 68 10: Carpet tile edge strips. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer's product literature. B. Samples: Furnish samples of each type of flooring color and pattern. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives and resilient flooring. 1.4 SITE CONDITIONS A. Ensure floor surfaces are smooth and flat with maximum variation of 1/8" in 10'-0". B. Ensure concrete floors are dry and exhibit negative alkalinity, carbonizing, and dusting. C. Maintain minimum 70-degree F air temperature at flooring installation area for three days prior to, during, and for 24 hours after installation. D. Store flooring materials in area of application; allow three days for material to reach same temperature as area. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Tarkett Inc/Azrock. B. Burke Mercer. C. Johnsonite, Inc. 451 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 65 20 - 2 Resilient Tile Flooring D. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide resilient tile flooring and accessories. B. Regulatory Requirements, Flammability: Provide materials tested under ASTM E648, Flooring Radiant Panel Test, with results of 0.45 watts/sq cm or higher. C. Regulatory Requirements, Slip-Resistance: 1. Slip-Resistant Hard Surfaces: Hard surface finishes to comply with requirements of authorities having jurisdiction for slip-resistant hard surfaces, including general code requirements and requirements for access for persons with disabilities. D. Vinyl Composition Tile (VCT): 12" by 12" by 1/8" thick; vinyl composition tile conforming to ASTM F1066, Composition 1. 1. Colors: Per Finish Schedule E. Vinyl Composition Tile (VCT): 12" by 12" by 1/8" thick; vinyl composition tile conforming to ASTM F1066 1. Static Dissipative type. Color per finish schedule F. Edge Strips: Homogeneous vinyl or rubber, tapered or bullnose edge, color as selected by Architect. G. Sub-Floor Filler: White premixed latex-cement paste designed for providing thin solid surface for leveling and minor ramping of subsurface to adjacent floor finishes. 1. Use material capable of being applied and feathered out to adjacent floor without spalling. H. Primers and Adhesives: Waterproof nontoxic types as recommended by flooring manufacturer for specified material and application. I. Sealer and Wax: Type recommended by flooring manufacturer for material type and location. PART 3 - EXECUTION 3.1 PREPARATION A. Conform to manufacturer's recommendations for preparation and to ASTM F710. B. Remove sub-floor ridges and bumps; fill low spots, cracks, joints, holes and defects with sub-floor filler. C. Clean floor and apply, trowel and float filler to leave smooth, flat hard surface; prohibit traffic until filler is cured. 452 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 65 20 - 3 Resilient Tile Flooring D. Test substrate for moisture content in accordance with flooring manufacturer recommendations; where moisture content exceeds recommendations take measures recommended by flooring manufacturer. 3.2 INSTALLATION A. Conform to manufacturer recommendations and installation instructions. 1. Open floor tile cartons, enough to cover each area, and mix tile to ensure shade variations do not occur within any one area. B. Spread cement evenly in quantity recommended by manufacturer to ensure adhesion over entire area of installation; spread only enough adhesive to permit installation of flooring before initial set. C. Set flooring in place using methods to ensure full adhesion. D. Lay flooring with joints parallel to building lines to produce symmetrical pattern. E. Install minimum 1/2 tile at room and area perimeter. F. Terminate resilient flooring at centerline of door openings where adjacent floor finish is dissimilar. G. Install edge strips at unprotected and exposed edges. H. Scribe flooring to walls, columns, floor outlets and other appurtenances, to produce tight joints. I. Consult with Architect for floor pattern desired in each area. J. Edge Strips: Install where edge of tile would otherwise be exposed; butt to flooring without gaps; set in adhesive. 3.3 CLEAN-UP AND PROTECTION A. Remove excess adhesive from floor, base and wall surfaces without causing damage. B. Clean, seal and wax floor surfaces in accordance with manufacturer's recommendations. C. Prohibit traffic from floor for 48 hours after installation. END OF SECTION 453 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 00 - 1 Carpeting SECTION 09 68 00 CARPETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide carpeting, adhered directly to substrate, with accessories, including edge strips where carpeting terminates at other floor finishes, for complete finished installation. 1. Provide rubber nosing at treads and landings with accessories as required for complete installation. B. Related Sections: 1. Section 09 65 10: Resilient base for carpeted areas. 2. Section 09 68 10: Tile carpeting. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer's literature for carpet and accessories. B. Shop Drawings: Clearly indicate location of seams, method of joining seams, carpet pile direction, adhesives to be used, integrating edge strips with carpet, and installation procedures. C. Samples: Furnish samples of each type, color and pattern of carpet and edge strip. 1. Submit production sample prior to manufacture of custom colors. 2. Submit finished carpet sample prior to installation. 3. Submit sample of resilient nosing at carpet stairs. D. Certificate of Compliance: Provide manufacturer's certificate of compliance stating each material delivered conforms to Specifications. E. Maintenance Recommendations: Prior to final acceptance of carpet installation, furnish carpet manufacturer's detailed maintenance recommendations for care, cleaning and repair of carpets installed. F. Extra Materials: Roll excess carpet on separate rolls for each type and size; label rolls to identify type, width, length, and locations installed. 1. Wrap and deliver unused portions greater than 2'-0" square and more than 12" wide. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for carpet systems, carpet cushion, and adhesives. 454 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 00 - 2 Carpeting B. Installer Qualifications: Approved by carpet manufacturer; upon request, submit letter from carpet manufacturer stating installer is acceptable. C. Mock-Up: Provide not less than 100 sf mock-up of each type of carpet installation at location as approved by Architect. Approved mock-up may be incorporated into Project. 1.4 SITE CONDITIONS A. Do not commence carpet installation until painting and finishing work is complete and ceiling and other overhead work has been tested, approved and completed, unless specifically approved. B. Maintain room temperature at minimum 60 degrees F for at least 24 hours prior to installation; relative humidity shall be approximately that at which the area is to be maintained. C. Schedule, receive, and place carpet on floors indicated; protect from soiling and damage during transit, storage, and installation. 1.5 WARRANTY A. Extended Correction Period: Provide for promptly repairing or replacing carpet which exhibits evidence of defective materials or workmanship. 1. Repairs: Make repairs within ten days of Owner's written notification. 2. Period: Two years. B. Manufacturer’s Warranty: Submit manufacturer’s lifetime warranty that carpet will lose no more than 10% weight of face yarn, and will not ravel, delaminate, or zipper. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Bentley (Basis of Design) B. Manufacturers listed on Finish Schedule. C. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide carpeting with accessories, including edge strips where carpeting terminates at other floor finishes. B. Regulatory Requirements, Flammability: Carpet shall have passed following tests. 1. DOC-FF-1-70: Pass. 2. ASTM E662 (Smoke Developed): 450 or less. 455 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 00 - 3 Carpeting 3. ASTM E648 or NFPA 253 (Flooring Radiant Panel Test): 0.45 or higher. C. Design Criteria: Provide carpet materials that bear Carpet and Rug Institute “Green Label Plus”. D. Performance Criteria: Carpet shall develop less than 3.0 kilovolts of static at 70- degrees F and 20% relative humidity. E. Carpet: Types as indicated on Finish Schedule; where not otherwise indicated types as selected by Architect based on following criteria. 1. Type: Dense tufted level loop pile carpet. 2. Yarn: Type 6.6 or later generation continuous filament soil hiding nylon. 3. Face Weight: 24 to 26 oz/sy as directed by Architect. 4. Face Weight: 28 to 30 oz/sy as directed by Architect. 5. Face Weight: 32 to 34 oz/sy as directed by Architect. 6. Backing: Polypropylene. 7. Antimicrobial Treatment: Provide to inhibit growth of bacteria, mold, and mildew. 8. Soil-Resistant Treatment: Manufacturer’s standard integral stain resistance. 9. Carpet shall have no latex backing materials. 10. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. F. Adhesive: Nontoxic type recommended by carpet and underlay manufacturers to suit application and expected service. G. Leveling and Ramping Material: Latex-cement material designed for providing thin solid surface for leveling and minor ramping of subsurface to adjacent floor finishes. 1. Use material capable of being applied and feathered out to adjacent floor without spalling. H. Edge Strips: Vinyl or rubber. 1. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. I. Stair Nosing: Rubber type; minimum 2" exposed surface. 1. Manufacturers: a. Flexco/No. 73. b. R.C.A. Rubber/Rubber Carpet Nosing. c. R.C. Musson/No. 145. d. Substitutions: Refer to Section 01 25 00. 2. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. J. Accessories: Provide as required for complete finished installation. 456 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 00 - 4 Carpeting PART 3 - EXECUTION 3.1 PREPARATION A. Clean floors of dust, dirt, solvents, oil, grease, paint, plaster and other substances detrimental to proper performance of adhesive and carpet; allow floors to thoroughly dry. B. Ensure floors are level, with maximum surface variation of 1/4" in 10 feet. C. Ensure concrete floors are free from scaling and irregularities and exhibit neutrality relative to acidity and alkalinity. D. Use leveling and ramping material to patch cracks, small holes, leveling and for ramping to provide finished carpet within 1/2" of adjacent flooring materials. E. Test substrate for moisture content in accordance with flooring manufacturer recommendations; where moisture content exceeds recommendations take measures recommended by flooring manufacturer. 3.2 INSTALLATION A. Adhesive Installation: Prime substrate if required and as recommended by manufacturer; spread adhesive in quantity recommended by manufacturer to ensure proper adhesion over full area of installation. 1. Apply only enough adhesive to permit proper adhesion of carpet before initial set. B. Install carpet in accordance with carpet manufacturer recommendations and installation instructions. 1. Check matching of carpet before cutting and ensure there are no visible defects or variations between dye lots. 2. Lay out rolls of carpet for Architect's approval. C. Cut carpet, where required, in manner to allow proper seam and pattern match; ensure cuts are straight, true, and unfrayed. D. Where possible and practical, locate seams in areas of least amount of traffic; no seams shall be perpendicular to doors or entries; seams parallel to doors shall be centered directly under door. 1. Follow wall line parallel to carpet direction for seams occurring at corridor change of direction. 2. Join seams in recommended manner so as not to detract from appearance of carpet installation and decrease its life expectancy; ensure seams are straight, not overlapped or peaked, and free of gaps. E. Adhesive Installation: Install carpet securely bonded to substrate. 457 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 00 - 5 Carpeting F. Lay carpet with run of pile in direction of anticipated traffic; do not change run of pile in any one room or from one room to next where continuous through a wall opening. G. Cut and fit carpet neatly around projections through floor and to walls and other vertical surfaces. H. Fit carpet snugly to walls or other vertical surfaces where no base is scheduled, leaving no gaps. I. Do not place heavy objects such as furniture on carpeted surfaces for minimum of 24 hours or until adhesive is set. J. Lay installation tight and flat to sub-floor, well fastened, and uniform in appearance; ensure monolithic color, pattern and texture match within any one area. K. Edging Strips: Install in accordance with manufacturer recommendations and installation instructions. 1. Install edging strips where carpet terminates at other floor coverings. 2. Use full length pieces only, butt tight to vertical surfaces. Where splicing cannot be avoided, butt ends tight and flush. L. Stair Nosing: Install in accordance with manufacturer recommendations and installation instructions. 1. Install stair nosing at upper approach and last tread in each run of steps; use full length pieces only, butt tight to vertical surfaces. 3.3 CLEANING A. Clean in accordance with manufacturer's recommendations. END OF SECTION 458 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 10 - 1 Tile Carpeting SECTION 09 68 10 TILE CARPETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide carpet tile including edge strips where carpeting terminates at other floor finishes and accessories as required for complete finished installation. B. Related Sections: 1. Section 09 68 00: Broadloom type carpeting. 1.2 SUBMITTALS A. Product Data: Prior to final acceptance of carpet tile installation, submit manufacturer's detailed maintenance recommendations for care, cleaning and repair of carpet tiles installed. B. Shop Drawings: Clearly indicate carpet tile layout, direction of carpet tiles, adhesive to be used, method of integrating edge strips with carpet tile, and installation procedures. C. Samples: Submit samples of each carpet tile type and color, and of each color of edge strip. D. Certificate of Compliance: Furnish manufacturer's certificate of compliance stating each material delivered conforms to Specifications. E. Maintenance Recommendations: Prior to final acceptance of carpet tile installation, furnish carpet tile manufacturer's detailed maintenance recommendations for care, cleaning and repair of carpet tiles installed. F. Maintenance Materials: Submit unused carpet tiles. Box unused carpet tiles and mark boxes indicating color and location installed. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for carpet systems and adhesives. B. Installer Qualifications: Firm with minimum five years successful experience in carpet tile installation and approved by carpet tile manufacturer. 1. Upon request, submit letter from carpet manufacturer stating installer is acceptable. C. Mock-Up: Provide minimum 12' by 12' mock-up of carpet tile for approval prior to beginning installation; approved mock-up may be incorporated into finished installation. 459 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 10 - 2 Tile Carpeting 1.4 PROJECT CONDITIONS A. Do not commence carpet tile installation until painting and finishing work is complete and ceiling and other overhead work has been tested, approved and completed, unless specifically approved. B. Maintain room temperature at minimum 60 degrees F for at least 24 hours prior to installation; relative humidity shall be approximately that at which area is to be maintained. C. Schedule, receive, and place carpet tile on floors indicated; protect from soiling and damage during transit, storage, and installation. 1.5 WARRANTY A. Extended Correction Period: Provide for promptly making good or replacing defective materials or workmanship. Repairs shall take place within ten days of written notification. 1. Period: Two years. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Bentley (Basis of Design) B. Manufacturers listed on Finish Schedule. C. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide carpet tile including edge strips where carpeting terminates at other floor finishes and accessories. B. Regulatory Requirements: Carpet tiles shall have passed following fire and smoke tests. 1. DOC-FF-1-70: Pass. 2. ASTM E662 (Smoke Developed): 450 or less. 3. ASTM E648 or NFPA 253 (Flooring Radiant Panel Test): 0.45 or higher. C. Design Criteria: Provide carpet materials that bear Carpet and Rug Institute “Green Label Plus”. D. Performance Requirements, Static: Carpet tile shall develop less than 3.0 kilovolts of static at 70 degrees F and 20 percent relative humidity. 460 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 10 - 3 Tile Carpeting E. Carpet Tile: Types as indicated on Finish Schedule; where carpet tile is not indicated provide as directed by Architect based on following criteria. 1. Yarn: 6.6 or later generation continuous filament soil hiding nylon. 2. Face Weight: Minimum 30 oz. per square yard. 3. Tile Size: As indicated, as selected by Architect from manufacturer’s full range of carpet tile sizes where not indicated. 4. Pile Height: Maximum 1/2”. 5. Backing: Integrated polyurethane cushion; no latex backing permitted. 6. Antimicrobial Treatment: Provide to inhibit growth of bacteria, mold, and mildew. 7. Soil-Resistant Treatment: Manufacturer’s standard integral stain resistance. 8. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. F. Adhesive: Nontoxic type recommended by carpet tile manufacturer to suit application and expected service. G. Leveling and Ramping Material: Latex-cement material designed for providing thin solid surface for leveling and minor ramping of subsurface to adjacent floor finishes. 1. Use material capable of being applied and feathered out to adjacent floor without spalling. H. Edge Strips: Vinyl or rubber. 1. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. I. Accessories: Provide as required for complete finished installation. PART 3 - EXECUTION 3.1 PREPARATION A. Clean floors of dust, dirt, solvents, oil, grease, paint, plaster and other substances detrimental to proper performance of adhesive and carpet tile; allow floors to thoroughly dry. B. Ensure floors are level, with maximum surface variation of 1/4" in 10 feet. C. Ensure concrete floors are free from scaling and irregularities and exhibit neutrality relative to acidity and alkalinity. D. Use leveling and ramping material to patch cracks, small holes, leveling and for ramping to provide finished carpet tile within 1/2" of adjacent flooring materials. 461 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 10 - 4 Tile Carpeting E. Test substrate for moisture content in accordance with flooring manufacturer recommendations; where moisture content exceeds recommendations take measures recommended by flooring manufacturer. 3.2 INSTALLATION A. Install carpet tiles in accordance with manufacturer's recommendations and installation instructions. 1. Adhere tiles to subfloor unless otherwise approved. B. Prime substrate if required and as recommended by manufacturer. Spread adhesive in quantity recommended by manufacturer to ensure proper adhesion. Apply only enough adhesive to permit proper adhesion of carpet tile before initial set. C. Lay carpet tile with run of pile in direction of anticipated traffic; do not change run of pile in any one room or from one room to next where continuous through a wall opening. 1. Finished installation to provide monolithic carpet tile appearance as approved by Architect. D. Cut and fit carpet tile neatly around projections through floor and to walls and other vertical surfaces. E. Fit carpet tiles snugly to walls or other vertical surfaces, leaving no gaps. F. Lay installation tight and flat to subfloor well fastened and uniform in appearance; ensure monolithic color, pattern and texture match within any one area. G. Edging Strips: Install in accordance with manufacturer recommendations and installation instructions. 1. Install edging strips where carpet terminates at other floor coverings. 2. Use full length pieces only, butt tight to vertical surfaces. Where splicing cannot be avoided, butt ends tight and flush. H. Do not place heavy objects such as furniture on carpet tiled surfaces for not less than 24 hours or until adhesive is set. 3.3 CLEANING A. Upon completion of carpet tile installation in each area, visually inspect carpet tile installed in that area and immediately remove dirt, soil and foreign substance from exposed face. B. Clean in accordance with manufacturer's recommendations. C. Inspect adjacent surfaces and remove marks and stains caused by carpet tile installation. D. Remove packaging materials, carpet tile scraps, and other debris from carpet tile installation. 462 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 68 10 - 5 Tile Carpeting END OF SECTION 463 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 72 10 - 1 Vinyl-Coated Fabric Wall Covering SECTION 09 72 10 VINYL-COATED FABRIC WALL COVERING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide adhesive applied vinyl-coated fabric wall coverings with accessories as required for complete finished installation. B. Related Sections: 1. Section 09 72 20: Fabric Wrapped Acoustical Panels 2. Section 06 20 00: Finish Carpentry 1.2 REFERENCES A. Federal Specification CCC-W-408: Wall Covering, Vinyl Coated. B. NSF/ANSI 324: Sustainability Assessment for Wallcovering. 1.3 ADMINISTRATIVE REQUIREMENTS A. Schedule installation of wall covering as late in construction schedule as possible to prevent damage during construction. 1.4 SUBMITTALS A. Product Data: Furnish manufacturer's literature. B. Samples: Furnish samples of vinyl wall covering. C. Maintenance Instructions: Furnish manufacturer's recommended cleaning materials and application methods, including precautions in use of cleaning materials which may be detrimental to surfaces. 1.5 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks. 1.6 DELIVERY, STORAGE, AND HANDLING A. Store wall covering in clean and dry area where temperatures are maintained at not less than 40-degrees F with normal humidity. 1. Do not store in upright position. B. Take precautionary measures with adhesives and solvents to prevent fire hazards. 464 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 72 10 - 2 Vinyl-Coated Fabric Wall Covering 1.7 SITE CONDITIONS A. Maintain surfaces and materials at minimum 60-degrees F three days before and during application period. B. Ensure maximum surface moisture conforms to wall covering manufacturer's requirements and surface exhibits negative alkalinity. C. Provide continuous ventilation during work and after installation of wall covering. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Manufacturers listed on Finish Schedules. 1. Innovations in Wall Covering B. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide adhesive applied vinyl-coated fabric wall coverings with accessories. B. Regulatory Requirements, Fire Ratings: 1. Maximum Flame Spread/Smoke Developed: ASTM E84, 25/450. 2. Corner Burn Test: NFPA 286, pass. C. Vinyl Wall Covering: Conform to CCC-W-408 Type II, medium duty quality; Class 2 mildew resistant, with cloth backing; paper backing is not acceptable. 1. NSF/ANSI 342: Compliance with NSF/ANSI 342 is acceptable where additional information is furnished indicating compliance with mildew resistance, and cloth backing. 2. Innovations in Wall Covering, Color per finish plan. 3. Special Finish: Provide minimum 0.005" thick DuPont/Tedlar finish. D. Adhesive: Nontoxic type recommended by wall covering manufacturer to suit application and complying with applicable limitations for volatile organic compound (VOC) emissions. E. Primer: Provide non-staining, non-toxic release coat primer as recommended by wall covering manufacturer. 1. Provide primer which allows removal of wall covering from gypsum board without damaging paper facing of board, and without premature separation of wall covering from wall. 465 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 72 10 - 3 Vinyl-Coated Fabric Wall Covering PART 3 - EXECUTION 3.1 EXAMINATION A. Ensure surfaces to receive wall covering are clean, true and free of irregularities, do not commence with work until surfaces are satisfactory. B. Ensure wall surface flatness tolerance does not vary more than 1/8" in 10'-0", nor vary at a rate greater than 1/16" per running foot. 3.2 PREPARATION A. General Substrates: Fill nicks, gouges and other minor imperfections of substrates with latex filler; sand smooth, flush with surface. 1. Apply prime coat in accordance with manufacturer's recommendations. B. Painted Surfaces: Wash down painted surfaces with tri-sodium phosphate, rinse with clear water; texture glossy surfaces with rough sandpaper for bond then seal; remove bleeding paint, flaky paint, and wood stain. 3.3 APPLICATION A. Handle and apply wall covering in accordance with manufacturer's recommendations and installation instructions. B. Mix and apply adhesive in accordance with adhesive manufacturer's recommendations. C. Use panels in exact order as cut from rolls; use rolls in consecutive order as numbered by manufacturer. 1. Hang smooth, non-match patterns by applying strips on the wall, overlapping the edges and double cutting through both thicknesses. 2. Patterns and Textures: Where used, trim deeply textures and patterns on a flat worktable to match textures and patterns from piece to piece. D. Apply secure, smooth, clean, and without wrinkles, gaps or overlaps; eliminate air pockets and ensure full bond to wall surface. E. Horizontal seams and cutting at corners are not acceptable. Cut no closer than 2" of inside corners and not closer than 6" of outside corners. F. Fill in spaces above and below windows, above doors and similar areas in sequence from roll. G. Remove excess adhesive from each seam before proceeding to next; wipe seam clean with dry cloth towel. H. Install wall covering before installation of plumbing, bases, hardware, and similar accessories. 466 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 09 72 10 - 4 Vinyl-Coated Fabric Wall Covering 3.4 CLEANING A. Clean wall coverings of adhesives, dust, dirt and other contaminants. B. Remove debris and leave areas neat and clean. C. Replace accessories. END OF SECTION 467 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 77 20 - 1 Fabric Wrapped Panels SECTION 09 77 20 FABRIC WRAPPED PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide (2) types of fabric wrapped panels including attachment devices and accessories as required for complete finished installation as specified below. Class C fire rating for council chamber. B. Provide fabric wrapped panels in Council area with added diffusion subplate as noted below providing a rated hole pattern of perforations for 1 dimensional added diffusion at high frequency. All other panels are hard faced and hard edged absorptive only, no diffusion subplate unless otherwise noted on plans. 1.2 ADMINISTRATIVE REQUIREMENTS A. Scheduling: Schedule installation of panels as close to Project completion as possible to prevent damage during construction and movement of materials. B. Provide to Prime contractor field and submittal coordination of seams and field devices as required to ship product in a timely fashion. C. Provide shop drawings in a timely fashion so as to advance shipping and procurement lead times. Backordered product due to unapproved or untimely shop drawings are the responsibility of the acoustic vendor and his field representatives. 1.3 SUBMITTALS A. Product Data: Submit manufacturer’s literature including information verifying compliance with performance requirements. 1. Submit product data sheets with annotated and marked actual model, suffix and edge profile with dimensions for this specific project site. a. Do not submit data sheets with multiple names, models, options or accessories without detailing the exact item to be installed. b. Keynote or annotate fire ratings of the installed product. c. Annotate product thickness. B. All panels shall be tested and rated for acoustic performance by octave band or spectra in a rated lab condition and noted on the product data sheet. 1. Testing methods for absorption shall be lab tested by ASTM C423 with various mountings differentiated. 468 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 77 20 - 2 Fabric Wrapped Panels 2. Diffusion subplate is an AES (Audio Engineering Society) test method for random diffusion, expressed graphically. 3. Absorption with NRC values alone and without octave band data are not accepted. C. Shop Drawings: Show panel construction and attachment method on dimensioned plans. Provide a plan and elevation with actual locations and dimensions noted, that is coordinated with architectural plans confirming locations, and include: 1. Review electrical device outlets on electrical plans at wall panel locations. 2. Review technology device outlets on technology plans at wall panel locations. 3. Note electrical, technology and AV devices that acoustic panels may cover in same areas. a. Note panel for device cutout size and finish dimensions for each device or location, such as switches, fire devices, AV mounts, video monitors, AV plates shown on technology plans. Never cover or impede devices. b. Provide keynotes or as required to coordinate panel cutouts. c. Dimensioned shop drawings supplied by vendor or manufacturer’s representative shall be reviewed and approved by the architect prior to shipping. D. Samples: Furnish each type of fabric. 1. Furnish corner profile of panel indicating construction, typically 1 ft2 minimum. E. Maintenance Instructions: Furnish for each fabric. 1. Include recommended cleaning materials and application methods, including precautions for cleaning materials that may be detrimental to surfaces if improperly applied. 1.4 DELIVERY, STORAGE, AND HANDLING A. Store fabric panels in clean and dry area where temperatures are maintained at minimum 40 degrees F with normal humidity. Prevent changes in humidity that expose fabric and adhesives to release. B. Maintain surfaces and materials at minimum 60 degrees F for three days before and during application period. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Kinetics Noise Control- Basis of Design (High Impact HardSide). 469 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 77 20 - 3 Fabric Wrapped Panels B. Real Acoustics equal to above C. RPG Products equal to above D. Sound Seal equal to above E. Provide 2.1 inch thick panels unless specifically noted otherwise on Schedule or plans. F. Manufacturers listed on Finish Schedule for Council Dais wall are limited to diffusion panels with diffusion substrate added: 1. Kinetics Noise Control #T.A.D. (Tuned Acoustic Diffusion) 2. RPG Product # B.A.D (Binaural Acoustic Diffusion) 3. Real Acoustics Diffusion panel. 4. Diffusion panels shall be ½ holes on 1/8 inch thick subplate directly under fabric that allow increased high frequency diffusion and less absorption as a variable impedance response with random mid and high frequency diffusion. Hole pattern shall be software selected and optimized. a. Peak absorption shall be centered at 400 Hz. Octave. b. Diffusion shall be effective from 800 Hz. To 5,000 Hz. G. All panels shall be tested and rated for acoustic performance in a rate lab or NVLAP lab test condition stated on the product data sheet. 1. 2.1 inch A mount NRC value is greater than 1.00 2. Octave band absorption (125-4,000 Hz): a. 0.44 0.75 > 1.00 >1.00 >1.00 >1.00 H. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide fabric wrapped panels including attachment devices and accessories with a two-part composite face for high abuse and durability. B. Regulatory Requirements: Flame Spread/Smoke Developed maximum 25/450 when tested in accordance with ASTM E84. C. Panels: Manufacturer's standard fabric wrapped panel system. 1. Core: Fiberglass core with chemically hardened edges and added 1/8 inch face on top for high density to resist top and edge damage; 2. Minimum 6-7 lb/cu. ft. fiberglass core density. 470 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 77 20 - 4 Fabric Wrapped Panels 3. Wrap fabric at edges to provide trim less edges. 4. For Council front room walls, diffusion subplate with AES tested hard profile. Subplate shall only reside directly below fabric, never inside the core. D. Fabric: As indicated: Basis of Design: Guilford of Maine, FR-701, #Silver Papier 538 E. Panel Fasteners: Manufacturer's standard concealed metallic fastener system. 2.3 FABRICATION A. Secure fabric to panels without wrinkles, gaps, seams or overlaps. Panels shall be inspected before shipping for same. B. Table square fabrics to provide completed panels with fabric yarns square and plumb. C. Provide only dimensionally straight, tight, and uniform seams and edges. D. Bond fabric to panel uniformly and consistently to avoid puckering, dimples or gaps. E. Tailor corners to maintain fabric flat and even. F. Completed Panels: Dimensionally stable fabric wrapped panel system. PART 3 - EXECUTION 3.1 INSPECTION A. Ensure wall surfaces to receive panels are clean, true and free of irregularities. B. Ensure all panels are delivered in factory cartons within a humidity controlled, clean and dry room, no exception. C. Ensure wall surface flatness tolerance does not vary more than 1/8" in 10'-0", nor vary at a rate greater than 1/16" per running foot. 3.2 APPLICATION A. Handle and apply panels in accordance with manufacturer's recommendations and installation instructions. B. Attach clip or magnetic system in accordance with panel manufacturer's recommendations and installation instructions. Secure to walls as indicated. C. Apply panels level and true. Panels with dimples, cuts loose fabric or sags shall be rejected and replaced immediately upon receipt to the site. 471 MOORPARK CITY HALL TENANT IMPROVEMENT 05/05/2023 MOORPARK, CALIFORNIA 09 77 20 - 5 Fabric Wrapped Panels 3.3 CLEANING A. Remove debris and leave areas neat and clean. B. Replace damaged and defective panels at contractor’s expense. END OF SECTION 472 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 1 Painting and Coating SECTION 09 90 00 PAINTING AND COATING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide painting and finishing of exposed items and surfaces requiring field painting and finishing including shop primed items. 1. Specified surface preparation, priming and coats of paint are in addition to shop- priming and surface treatment specified under other sections of work. 2. Painting and finishing include field finishing of exterior and interior items not listed as "Surfaces not to be Painted" unless clearly indicated otherwise. 3. Painting and finishing include field finishing of select shop finished items such as mechanical grilles and registers and shop primed items such as access panels and louvers in doors, to match adjacent surfaces. a. Match adjacent surfaces in color and sheen unless otherwise indicated. 4. Field paint exposed bare and covered pipes, ducts, and hangers, exposed steel and iron work, and primed metal surfaces of equipment installed under mechanical and electrical work in occupied spaces. 5. Wood Doors: Contractor option to factory finish or field finish, coordinate with Section 08 14 00 - Wood Doors. B. Surfaces Not to be Painted: 1. Finished items including finished metal surfaces. 2. Walls and ceilings in concealed areas and generally inaccessible areas. 3. Moving parts of operating mechanical and electrical units. 4. Labels: Keep equipment identification and fire rating labels free of paint. 5. Plastic smoke stops and weather-stripping at doors. C. Related Sections: Shop priming of ferrous metal items is included under various Specification sections. 1. Section 06 40 00: Shop finishing of architectural woodwork. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's technical information, including paint label analysis and application instructions for each material. 473 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 2 Painting and Coating B. Samples: Submit samples for review of color and texture; provide list of material and application for each coat of each finish sample. 1. Brush-Outs: Submit samples of each color and material with texture to simulate actual conditions, on hardboard. a. Submit 8" square samples of wood finishes on actual wood surfaces; label and identify each as to location and application. 2. Field Samples: Duplicate painted finishes of approved samples on actual wall surfaces and components for approval prior to commencing work. a. Size: Minimum 100 sf located where approved. 1) Provide on building mock ups for each exterior color type indicated on elevations. Provide 4 alternate colors for each. (approximately 20 unique colors.) Architect to provide color selection during construction. C. Manufacturer Certificates: Furnish certificates from each manufacturer stating materials are top quality lines and suitable for intended use on this Project. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for paints and coatings. 1.4 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to job site in original, new and unopened packages and containers bearing manufacturer's name and label, with: 1. Name of material, color and sheen. 2. Manufacturer's name, stock number and date of manufacture. 3. Contents by volume, for major pigment and vehicle constituents. 4. Thinning and application instructions. 1.5 SITE CONDITIONS A. Apply water-base paints when temperature of surfaces and surrounding air are between 50 and 90-degrees F. B. Do not apply paint in rain, fog or mist; or when relative humidity exceeds 85 percent; or to damp or wet surfaces. C. Painting may be continued during inclement weather if areas to be painted are enclosed and heated within temperature limits specified. D. Provide additional temporary ventilation during interior application of paints to eliminate volatile organic compound (VOC) emissions from interior spaces as quickly as possible. 474 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 3 Painting and Coating PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Sherwin-Williams Co. B. Pittsburgh Paints, PPG C. Dunn-Edwards Corp. D. Vista Paint Co. E. Varathane F. Minwax G. Cabot H. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide painting and finishing of exposed items and surfaces requiring field painting and finishing including shop primed items. 1. Definition: "Painting" and “coating” as used herein means systems including primers, emulsions, enamels, stains, sealers and fillers, whether used as prime, intermediate or finish coats. B. Regulatory Requirements: 1. Volatile Organic Compound (VOC) Emissions: Furnish materials approved for use by applicable air quality management district for limitations of volatile organic compounds for architectural or special coatings as applicable. 2. California Stair Stripes: Paint 2" stripes at stair nosing not otherwise marked, full tread and landing width, in accordance with California Code of Regulations, Title 24, Access Compliance requirements. a. Interior Stairs: Provide at landing and last tread at each stair run. C. Material Quality: Provide top line quality commercial grade (professional painter) paints; materials not bearing manufacturer's identification as their top line product shall not be acceptable. 1. Primers: Provide premium grade primers recommended by paint manufacturer for substrates indicated and for finish systems specified. 2. Undercoats and Barrier Coats: Provide undercoat paints produced by same manufacturer as finish coats; use only thinners approved by paint manufacturer and use only within recommended limits. 475 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 4 Painting and Coating 3. Finish Coats: Provide finish coats capable of being washed with mild detergent without loss of color, sheen, or pigments. a. Color pigments: Pure, non-fading, applicable types to suit substrates and service indicated; no lead content permitted. 4. Finish Coat Coordination: Provide finish coats which are compatible with prime paints, undercoats, and barrier coats used. a. Review other Specification sections in which prime paints are provided; ensure compatibility of total coatings systems. b. Upon request from other trades furnish information on characteristics of finish materials proposed for use. c. Provide barrier coats over incompatible primers or remove and prime as required. d. Notify Architect in writing of any anticipated problems in use of specified coating systems with substrates primed by others. D. Colors and Finishes: Prior to commencement of painting work, Architect will furnish color chips for surfaces to be painted. 1. Use of proprietary names in color selection is not intended to imply exclusion of equivalent products of other manufacturers. 2. Final acceptance of colors will be from samples applied on site. 3. Colors: Where color is not indicated on Drawings or Finish Schedule, provide custom color as directed by Architect. PART 3 - EXECUTION 3.1 PREPARATION A. Inspection: Examine areas and conditions under which painting work is to be applied. 1. Start of painting work indicates acceptance of surfaces and conditions of surfaces and conditions within any area. 2. Where exposed items or surfaces are not specifically mentioned in Schedules, paint same as adjacent similar materials or areas. 3. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to a durable paint film. B. Perform preparation and cleaning procedures in accordance with paint manufacturer's instructions and as specified for substrate condition. 1. Existing Painted Finishes: 476 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 5 Painting and Coating a. Clean existing painted surfaces and remove oil, grease, dust, stains, scale, efflorescence, mildew, mold, algae, blisters, and non-adhering paint. b. Via Powerwash and other means, remove all organic material from building attached vines. c. Measure adhesion of existing paints using ASTM D3359 tape test; remove existing coatings where poor adhesion is indicated. d. Feather edges of severely deteriorated paint where several coats are removed as part of cleaning, to provide smooth transition for new paint. e. Fill holes, cracks, and defects and fill and sand smooth, ready for new paint finish. C. Remove hardware, accessories, and items in place and not to be painted, or provide protection prior to surface preparation and painting; after painting reinstall removed items. D. Clean surfaces before applying paint; remove oil and grease prior to mechanical cleaning; program cleaning so contaminants from cleaning process do not fall onto wet, newly painted surfaces. E. Cementitious Materials: Prepare by removing efflorescence, chalk, dirt, grease, oils, and by roughening as required to remove glaze. 1. Determine alkalinity and moisture content of surfaces to be painted. 2. If surfaces are found to be sufficiently alkaline to cause blistering and burning of finish paint, neutralize before application of paint. 3. Do not paint over surfaces where moisture content exceeds manufacturer's printed directions. F. Wood: Clean wood surfaces of dirt, oil, and other foreign substances; sandpaper smooth surfaces exposed to view and dust off. 1. Scrape and clean seasoned knots and apply thin coat of recommended knot sealer, before application of priming coat. 2. Prime, stain, or seal wood required to be job-painted immediately upon delivery to job; prime edges, ends, faces, undersides, and backsides of wood. 3. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood-filler; sandpaper smooth when dry. G. Ferrous Metals: Touch up shop-applied prime coats wherever damaged using same type of primer as applied in shop or barrier coat compatible with finish paint. 1. Bare Surfaces: Clean surfaces that are not galvanized or shop-coated, of oil, dirt, loose mill scale and other foreign substances by solvent or mechanical cleaning. 477 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 6 Painting and Coating 2. Galvanized Surfaces: Clean free of oil and surface contaminants, using non- petroleum-based solvent; primer and touch-up primer to be zinc-rich primer. H. Mix painting materials in accordance with manufacturer's directions. I. Store materials in tightly covered containers; maintain containers used in storage, mixing and application of paint in a clean condition, free of foreign materials and residue. J. Stir materials before application to produce mixture of uniform density and stir as required during application; do not stir surface film into material, if necessary, strain material before using. 3.2 APPLICATION A. Apply paint in accordance with manufacturer's directions; use applicators and techniques best suited for substrate and type of material being applied. 1. Apply additional coats when stains or blemishes show through final coat, until paint is a uniform finish, color and appearance. 2. Provide extra attention during application to assure dry film thickness at corners and crevices is equivalent to that of flat surfaces. 3. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces; paint surfaces behind permanently fixed equipment and furniture with prime coat only. 4. Finish doors on tops, bottoms and side edges same as faces. 5. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. 6. Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, non-specular black paint. 7. Sand lightly between coats when recommended by system manufacturer. B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated or prepared for painting as soon as practicable after preparation. 1. Allow time between successive coatings to permit proper drying. 2. Do not recoat until paint feels firm and does not deform or feel sticky under moderate thumb pressure. C. Minimum Coating Thickness: Apply materials at not less than manufacturer's recommended spreading rate, to establish a total dry film thickness as recommended by coating manufacturer. D. Prime Coats: Apply to items not previously primed; recoat primed and sealed surfaces where there is evidence of suction spots or unsealed areas in first coat. 478 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 7 Painting and Coating E. Finish Coats: Provide even texture; leave no laps, irregularity in texture, skid marks, or other surface imperfections. 1. Opaque Finishes: Provide opaque, uniform finish, color and coverage; cloudiness, spotting, holidays, brush marks, runs, sags, ropiness, and other surface imperfections are not acceptable. 2. Transparent and Stained Finishes: Produce glass smooth surface film of even luster; provide with no cloudiness, color irregularity, runs, brush marks, orange peel, nail holes, and other surface imperfections. 3.3 Completed Work: Match approved samples for color, texture and coverage; remove, refinish or repaint work not accepted, at contractor’s expense. 3.4 PAINTING SCHEDULE A. Exterior Work: Provide following paint systems and sheens unless otherwise indicated. 1. Metal: Semigloss sheen. a. 1st Coat: Touch-up primer, prime if none. b. 2nd and 3rd Coat: Exterior 100% acrylic enamel. 2. Concrete: Flat sheen. a. 1st and 2nd Coat: Exterior acrylic latex emulsion. 3. Plaster: Flat sheen. a. 1st and 2nd Coat: Heavy body vapor permeable waterproof elastomeric acrylic coating. 4. Concrete Masonry Units: Flat sheen. a. 1st Coat: Surface filler. b. 2nd and 3rd Coat: Heavy body waterproof acrylic emulsion. c. Apply filler at rate to ensure coverage with pores filled. 5. Traffic Line Paint: Manufacturer's standard sheen; colors as required by line or symbol; blue for handicapped parking spaces. a. 1st and 2nd Coat: Water based acrylic/epoxy traffic line paint; other systems subject to prior approval by Architect. A. Interior Work: Provide following paint systems and sheens unless otherwise indicated. 1. Gypsum Board Systems: Eggshell (satin) sheen at walls, flat sheen at ceilings, semigloss sheen at toilet rooms. a. 1st Coat: Universal primer. b. 2nd and 3rd Coat: Interior latex or acrylic latex emulsion. 479 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 8 Painting and Coating 2. Metal: Semigloss sheen. a. 1st Coat: Touch-up primer, prime if none. b. 2nd and 3rd Coat: 100% acrylic enamel. 3. Opaque Finished Wood: Semigloss sheen. a. 1st Coat: Primer undercoat. b. 2nd and 3rd Coat: 100% acrylic enamel. 4. Stained Wood: Satin rubbed sheen. a. 1st Coat: Wood stain. b. 2nd Coat: Sanding sealer. c. 3rd and 4th Coat: Acrylic modified urethane. d. Fill open grained wood with filler and wipe before 2nd coat. 5. Transparent Finished Wood: Satin rubbed sheen. a. 1st Coat: Bleached shellac. b. 2nd and 3rd Coat: Acrylic modified urethane rubbing varnish. c. Fill open grained wood with filler and wipe before 1st coat. 6. Concrete: Flat sheen. a. 1st Coat: Primer sealer. b. 2nd and 3rd Coat: Interior latex emulsion. 7. Plaster: Eggshell (satin) sheen at walls, flat sheen at ceilings, semigloss sheen at toilet rooms. a. 1st Coat: Latex primer-sealer. b. 2nd and 3rd Coat: Interior acrylic latex emulsion. B. Sheens: Comply with ASTM D523, reflectance of paint. 1. Flat: 1-10. 2. Satin: 15-30. 3. Eggshell: 30-45. 4. Semigloss: 45-75. 5. Gloss: 75-100. 3.2 CLEAN-UP, PROTECTION, AND REPAIR A. Clean-Up: During progress of work, remove discarded paint materials, rubbish, cans and rags from site at end of each workday. 1. Clean glass and paint-spattered surfaces immediately by proper methods of washing and scraping, using care not to scratch or damage finished surfaces. 480 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 09 90 00 - 9 Painting and Coating B. Protection: Protect work of other trades, whether to be painted or not; correct damage by cleaning, repairing or replacing, and repainting, as acceptable to Architect. 1. Provide "Wet Paint" signs to protect newly painted finishes. 2. Remove temporary protective wrappings provided by others for protection of their work, after completion of painting operations. C. Repair: At completion of work of other trades, touch-up and restore damaged surfaces or defaced painted surfaces. END OF SECTION 481 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 14 00 - 1 Signage SECTION 10 14 00 SIGNAGE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide general signage as indicated complete with attachment devices and accessories as required for complete installation. B. Related Sections: 1. Section 09 90 00: Traffic line paint. 2. Section 10 44 00: Fire extinguisher cabinet graphics. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer's literature and indicate each sign type, style, color, and method of attachment. B. Shop Drawings: Furnish listing of sign types, lettering and locations, along with dimensions of each sign. 1. Computerized Output: Furnish computerized samples of signs and graphics at full scale duplicating final appearance. 2. Dimensional Letter Signs: Furnish complete shop drawings regarding fabrication and method of attachment of dimension letter signs. 3. Photoluminescent Egress Path Signage: Submit complete shop drawings indicating locations of luminous egress path markings and signage. C. Samples: Furnish full size samples where requested. D. Certification: Furnish manufacturer certification that photoluminescent egress path markings and signage conform to California Building Code requirements. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives. 1.4 DELIVERY, STORAGE, AND HANDLING A. Package separately or in like groups of names, labeled as to names enclosed; include installation template, attachment system and installation instructions. 482 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 14 00 - 2 Signage PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Brandex: www.brandexmedia.com B. ASI Modulex, ASI Sign Systems, Inc. C. Mohawk Sign Systems. D. Vomar Products, Inc. E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide signage as indicated with attachment devices and accessories. B. Regulatory Requirements: Provide signs for assuring access for persons with disabilities in accordance with state and federal regulations. 1. California Regulations: Comply with California Building Code. 2. Federal Regulations: Comply with Americans with Disabilities Act (ADA) Standards. C. Dimensional Letter Signage: Provide individual letter signs as indicated. (deferred approval) 1. Aluminum: Manufacturer's standard for individual letter signs. a. Finish: Clear anodized finish, AA-M12C22A41, Class I, AAMA 607.1. 2. Fabrication: Fabricate dimensional letters as indicated, of minimum 0.25" plate or casting with edges and corners smooth and finished to match adjacent metal finishes. 3. Attachment: Secure letters using connections concealed after installation; method subject to Architect approval. a. Take care back welding does not damage exposed sign surfaces. D. Toilet Room Door Signs: Provide door signs conforming to California requirements for signs for toilet rooms; concealed mounting system. 1. Material, Plastic: Manufacturer’s standard colored plastic/photopolymer signs. a. Texture: Smooth. b. Colors: background color: white at existing doors, tbd at new doors. 1) Shall contrast with door color as required by code, contractor to verify. 483 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 14 00 - 3 Signage 2. Total Thickness: 0.25". 3. Provide signs required by California Code of Regulations Title 24. a. Men's Room: 12" equilateral triangle, vertex pointing up. b. Ladies' Room: 12" diameter circle. c. Unisex Toilet: 12" diameter circle with equilateral triangle, vertex pointing up, superimposed on the circle; circle and triangle each 0.25" thick. 1) Colors: background color: white at existing doors, tbd at new doors. Shall contrast with door color as required by code, contractor to verify. 4. Symbols: As selected from manufacturer's standard symbols. 5. Adhesive: Type as recommended by sign manufacturer for type of substrate involved. E. Toilet Room Wall Signs: Provide signs conforming to California Building Code and ADA Standards for signs for permanent rooms, with inset symbols and with raised and Braille characters; concealed mounting system. 1. Material, Plastic: Manufacturer’s standard colored plastic/photopolymer signs. a. Texture: Smooth. 2. Colors: as indicated on details 3. Material: Plastic: Manufacturer’s standard colored plastic/photopolymer signs. 4. Comply with California Building Code and ADA Standards for raised and Braille characters, pictorial symbols, finish, and contrasts requirements. F. Entry Decals: Provide minimum 6" square decals with international handicapped symbol white on blue background with white border, applied to glass at accessible entry doors of existing buildings where all entry doors are not accessible. G. Stairway Signs: Provide colored plastic/photopolymer signs in stairways, conforming to California Building Standards Code, Section 1022.9. 1. Lettering: Type as required by CBC. 2. Colors, Size, and Style: Conform to referenced code requirements and as approved by Architect. a. Colors: as indicated in details 3. Information: Identify stairway, indicate whether there is roof access, floor level, and upper and lower terminus of stairway, and story of and direction to exit discharge. 484 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 14 00 - 4 Signage 4. Provide raised five-pointed star located to left of identifying floor level at exit discharge level. 5. Provide Floor Identification Signs required by CBC including both tactile and Braille sign. H. Porcelain Signs at Parking: Provide porcelain enamel on steel sign with beaded text and symbols meeting requirements of California Building Standards Code and with ADA Standards. 1. At entry to parking provide state required sign indicating unauthorized vehicles parking in accessible parking spaces may be towed at owner's expense using exact wording required by CBC. 2. Verify location and telephone number of location vehicle is to be towed with Owner; place this information as permanent part of sign wording. 3. At parking spaces provide California required reflectorized sign, minimum 70 sq. inches, with symbol indicating accessibility. 4. At van accessible parking spaces provide required "VAN PARKING" signs. I. Tactile Exit Door Signs: Provide colored plastic/photopolymer signs, conforming to California Building Code Section 10006 and ADA Standards for signs for permanent rooms, with tactile raised and Braille characters; concealed mounting system. 1. Colors: as indicated. 2. Size and Style: As indicated on Drawings. J. Room Identification and Direction Signs: Provide signs conforming to California and ADA Standards for permanent signs, total thickness 0.125"; provide raised and Braille characters conforming to California and ADA Standards; concealed mounting. 1. Material, Plastic: Manufacturer’s standard colored plastic/photopolymer signs. a. Texture: Smooth. 2. Colors: as indicated K. Vinyl Signs and Graphics: Computer design vinyl signs and graphics to designs and criteria established by Architect. a. Vinyl: Opaque non-reflective vinyl film, minimum 0.0035" thick, with pressure sensitive adhesive backing suitable for applications indicated; match 3M/Scotchcal Vinyl Film. 2. Colors: as indicated or selected from manufacturer’s standard colors. 485 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 14 00 - 5 Signage PART 3 - EXECUTION 3.1 INSTALLATION A. General: Install signs in accordance with manufacturer recommendations and installation instructions, free from distortions and defects. B. Dimensional Letter Signage: Locate dimensional letters with spacing based on full- size computer-generated installation drawings secured to structure as required to resist anticipated loads. 1. Final Location: As approved in field by Architect based on full size drawings. C. Toilet Room Door Signs: Install signs on doors after doors are painted and finished. 1. Location: Mount signs with centerline of sign between 58" and 60" height as required by applicable code. 2. Install centered and level, in line, in accordance with the manufacturer's recommendations. 3. Clean and polish, remove excess adhesive. D. Toilet Room Wall Signs: Install signs on walls after surfaces on which they are to be mounted are painted and finished. 1. Location: Mount signs at 48" to 60" height as required by applicable codes on strike side of door. 2. Location: Mount signs with tactile characters 48" minimum (baseline of lowest Braille cells) and 60" maximum (baseline of highest line of raised characters) above finished floor and with on strike side of door for room identification signs as required by applicable codes, at heights indicated on details. 3. Install level, in line, in accordance with California Building Code and ADA Standards to allow a person to approach within 3" of signs without being within a door swing and without encountering protruding objects. 4. Clean and polish, remove excess adhesive. E. Entry Signs: Install in locations as approved by Architect. F. Stair Signs: Install signs inside stairwell after walls are finished, at locations immediately adjacent to door on strike side as required by referenced code, readily visible when door is open. 1. Location: Mount signs at 48" to 60" height as required by applicable codes. G. Parking Signs: Provide mounting hardware, including painted posts, as needed; mount signs at heights required by state code. 1. Install parking entry sign at location as directed by Architect. 486 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 14 00 - 6 Signage H. Tactile Exit Door Signs: Install at doors with lighted “EXIT” signs; apply after walls are finished. 1. Location: Mount signs at 48" to 60" height as required by applicable codes on strike side of door. 2. Install level, in line, in accordance with the manufacturer's recommendations and ADA Standards to allow a person to approach within 3" of signs without being within a door swing and without encountering protruding objects. 3. Clean and polish, remove excess adhesive. I. Room Identification and Direction Signs: Install signs after walls are finished. 1. Location: Mount signs at 48" to 60" height as required by applicable codes on strike side of door for room identification signs, where indicated for direction signs. 2. Room Identification Signs Location: Mount signs with tactile characters 48" minimum (baseline of lowest Braille cells) and 60" maximum (baseline of highest line of raised characters) above finished floor and with on strike side of door for room identification signs and where indicated for directional signs. 3. Install signs level, in line, in accordance with the manufacturer's recommendations, California Building Code and ADA Standards. 4. Install room identification signs at doors to allow a person to approach within 3" of signs without being within a door swing and without encountering protruding objects. 5. Clean and polish, remove excess adhesive. J. Applied Copy Signs and Graphics: Examine surfaces and construction for conditions adversely affecting installation, performance and quality of work. 1. Apply signage and graphics centered and level, in line, in accordance with manufacturer's recommendations. END OF SECTION 487 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 21 20 - 1 Phenolic Toilet Compartments SECTION 10 21 20 PHENOLIC TOILET COMPARTMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide phenolic plastic partitions for toilet compartments including hardware, attachment devices, and integral accessories as required for complete installation. 1. Urinal Screens: Provide wall mounted phenolic plastic partitions for urinal screens including attachment hardware for complete finished installation. B. Related Sections: 1. Section 10 28 00: Toilet accessories. 1.2 REFERENCES A. Americans with Disabilities Act (ADA) Standards. B. California Building Code: California Code of Regulations, Title 24, Part 2, requirements for providing accessibility for persons with disabilities. 1.3 SUBMITTALS A. Product Data: Submit manufacturer's literature. B. Shop Drawings: Clearly indicate partition layouts, swing of doors, elevations, anchorage and mounting details, panel construction, hardware, finishes and relevant dimensions. C. Samples: Submit samples of metal finish. 1.4 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Global Partitions, an ASI Group Company. B. Flush Metal Partition Corp. C. Bradley Corporation Mills Partitions. Basis of Design 488 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 21 20 - 2 Phenolic Toilet Compartments D. General Partitions Mfg. Corp. E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide phenolic plastic partitions including hardware, attachment devices, and integral accessories. 1. Toilet Compartment Type: Floor mounted, overhead braced. 2. Urinal Screens: Provide wall mounted urinal screens. B. Regulatory Requirements, Access: Comply with California Building Code and Americans with Disabilities Act (ADA) Standards. 1. Door Width: Provide minimum 32" clear door openings when front entry, minimum 34" clear door openings when side entry. 2. Spacing: Provide minimum 60" clear width, and front space as applicable for type of compartment. 3. Reinforcing: Provide reinforcing for grab bars indicated to be partition mounted. 4. Urinal Screens: Provide minimum 30" clear space at urinal. C. Regulatory Requirements, Fire Rating: Comply with requirements for fire ratings for interior finishes with either ASTM E84 or NFPA 286, Corner Burn Test as applicable. D. Phenolic Panels: Manufacturer's standard phenolic core with high pressure melamine color surface on faces, with exposed black phenolic edges burnished and slightly rounded. 1. Colors: Smoke Quarstone, basis of design. E. Pilaster Shoes: 3" high; ASTM A666, Type 304, No. 4 polished finish; stainless steel. F. Attachments, Screws and Bolts: Stainless steel; tamper proof type; heavy duty extruded aluminum brackets. G. Hardware: Manufacturer's standard chrome plated or similar finish. 1. Hinges: Cast pivot hinges, gravity self-closing type, adjustable for door close positioning; nylon bearings. 2. Latch: Slide latch; door strike and keeper with rubber bumper. 3. Coat Hook/Bumper: Combination coat hook and bumper unit, maximum 48" above finished floor. 4. Wall Bumper: Wall mounted rubber bumper for out-swinging doors. 489 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 21 20 - 3 Phenolic Toilet Compartments 5. Pulls: Manufacturer’s standard; provide two "U-shaped" pulls immediately below latch at compartments accessible to persons with disabilities (compartments with grab bars), one inside and one outside. H. Overhead Braced Partition Headrails: 1" by 1-5/8" tubular metal, with cast socket type wall brackets. 1. Colors: Bradley Smoke Quartstone, Basis of Design 2.3 FABRICATION A. Fabricate: Manufacturer’s standard construction. B. Doors and Panels: Minimum 3/4" thick doors and 1/2” thick panels, minimum 24" wide by minimum 58" high. 1. Provide wider doors where required for accessibility for persons with disabilities. C. Pilasters: 1-1/4" thick, constructed same as doors, of sizes required to suit cubicle widths and spacing. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine site conditions to which work is to be applied. B. Take site dimensions affecting this work. C. Ensure correct spacing and size of plumbing fixtures; take special note of fixtures in compartments indicated to be designed for persons with disabilities to assure clearances complying with access regulations. D. Ensure correct location of built-in framing, anchorage, and bracing, where required. 3.2 INSTALLATION A. Install units in accordance with manufacturer recommendations and installation instructions, secure, plumb, level, and square. B. Leave 1/2" space between wall, panels and end pilasters. C. Attach panel brackets securely to walls using anchor devices. D. Attach panels and pilasters to bracket with through sleeve tamper proof bolts and nuts. E. Locate headrail joints at pilaster center lines. F. Provide for adjustment of floor variations with screw jack through steel saddles integral with pilaster; conceal floor fastenings with stainless steel shoes. G. Equip each door with hinges, latch, and coat hook/bumper combination. 490 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 21 20 - 4 Phenolic Toilet Compartments H. Install door strike keeper and door bumper on each pilaster in alignment with door latch. I. Adjust and align hardware to uniform clearance at vertical edges of doors not exceeding 3/16". J. Adjust hinges to locate doors in partial open position when unlatched, except adjust hinges to return doors to closed position at stalls designed for use by persons with disabilities. K. Anchor urinal screen panels to walls with either two panel brackets each or continuous angle brackets on both sides. 3.3 CLEANING A. Field touch-up of scratches and defaced finishes will not be permitted; replace damaged, scratched and marred defective materials with new, undamaged materials. B. Remove protective coverings and clean surfaces in accordance with manufacturer recommendations. END OF SECTION 491 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 28 00 - 1 Toilet Accessories SECTION 10 28 00 TOILET ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide toilet accessories with attachment hardware and rough-in frames as required for complete, operational installation. B. Related Sections: 1. Section 08 80 00: Frameless glass mirrors. 2. Section 10 21 20 Phenolic Toilet Compartments 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product data illustrating each accessory at large scale. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives. 1.4 DELIVERY, STORAGE, AND HANDLING A. Deliver inserts and rough-in frames to jobsite at appropriate time for building in. B. Do not deliver accessories to site until rooms in which they are to be installed are ready to receive them. C. Pack accessories individually, protect each item and its finish. 1.5 SITE CONDITIONS A. Protect adjacent or adjoining finished surfaces from damage during installation of work of this section. B. Before starting work notify Architect in writing of conditions detrimental to installation or operation of units. C. Verify with Architect exact location of accessories. 492 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 28 00 - 2 Toilet Accessories 1.6 WARRANTY A. Extended Correction Period: 1. Replace mirrors which exhibit signs of desilvering or distortion. 2. Period: Two years. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Bobrick Washroom Equipment, Inc. B. Bradley Corporation. C. American Specialties, Inc. D. Manufacturers listed on Toilet Accessories Schedules. E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide toilet accessories with attachment hardware and rough- in frames. 1. Provide standard materials and finishes for accessories listed; where more than one material or finish is available and not otherwise indicated provide as selected by Architect from manufacturer’s standard materials and finishes. B. Regulatory Requirements - Access for Persons with Disabilities: Comply with California Building Standards Code and Americans with Disabilities Act (ADA) Standards. C. Stainless Steel Sheet: ASTM A666, commercial grade, Type 304, gages as standard with manufacturer of specified items. D. Stainless Steel Tubing: ASTM A269, commercial grade, seamless welded. E. Sheet Steel: ASTM A1008, cold rolled stretcher leveled; minimum G90 galvanized coating, ASTM A924 and A653. F. Adhesive: Epoxy type contact cement as recommended by accessory manufacturer; comply with applicable requirements for limitations on volatile organic compound (VOC) emissions. G. Fasteners, Screws, and Bolts: Hot dip galvanized; as recommended by accessory manufacturer for component and substrate. 493 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 28 00 - 3 Toilet Accessories H. Keys: Provide universal keys for access to toilet accessory units requiring internal access for servicing and supply. 1. Provide minimum six keys to Owner representative. 2.3 FABRICATION A. Weld and grind smooth joints of fabricated components. B. Form exposed surfaces from one sheet of stock, free of joints. C. Fabricate units with tight seams and joints, exposed edges rolled; hang doors and access panels with continuous piano hinges; provide concealed anchorage where possible. D. Provide steel anchor plates and anchor components for installation on building finishes. E. Form surfaces flat without distortion; maintain flat surfaces without scratches and without dents; finish exposed edges eased, free of sharp edges where potential exists for physical contact. F. Back paint components where contact is made with building finishes, to prevent electrolysis. G. Hot-dip galvanize ferrous metal anchors and fastening devices. H. Assemble components in shop; package complete with anchors and fittings. 2.4 FINISHES A. Exposed Finishes: Stainless steel, number 4, satin finish; satin chrome finish acceptable where stainless steel not available for accessory item listed or scheduled. B. Concealed Surfaces: Treat and clean, spray-apply one coat primer and baked enamel finish. PART 3 - EXECUTION 3.1 PREPARATION A. Provide templates and rough-in measurements. 3.2 INSTALLATION A. Install accessories in accordance with manufacturer's printed instructions using fasteners appropriate to substrate. B. Install true, plumb and level, securely and rigidly anchored to substrate. C. Use tamper-proof, security type fasteners. 494 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 28 00 - 4 Toilet Accessories D. Adjust accessories for proper operation and verify mechanisms function smoothly. E. Replace damaged and defective items. F. Clean and polish exposed surfaces after removing temporary labels. 3.3 TOILET ACCESSORIES SCHEDULE A. Refer to Drawings. END OF SECTION 495 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 44 00 - 1 Fire Extinguisher Cabinets SECTION 10 44 00 FIRE EXTINGUISHER CABINETS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide semi-recessed cabinets for portable fire extinguishers with accessories as required for complete installation. 1. Fire Extinguisher Bottles: Contractor Furnished for each location. B. Related Sections: 1. Division 21: Fire protection systems. 1.2 SUBMITTALS A. Product Data: Furnish manufacturer's literature. PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. J.L. Industries. B. Larsen’s Manufacturing Co. C. Potter Roemer. D. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide semi-recessed cabinets for portable fire extinguishers with accessories. B. Fire Extinguisher Cabinets: Provide semi-recessed mounting unless otherwise indicated, maximum 4” extension beyond wall finish surface, provide trim suitable for installation indicated. 1. Type: a. J.L. Industries/Ambassador Series. b. Larsen’s Mfg. Co./Architectural Series. c. Potter Roemer/Alta Series. d. Substitutions: Refer to Section 01 25 00. 2. Typical Cabinet Depth: Provide cabinets designed for space available in walls with fire extinguisher cabinets, and of depth to house 2A-10BC multi-purpose dry chemical type fire extinguisher. C. Trim: Manufacturer's standard edge trim for specified models. 496 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 10 44 00 - 2 Fire Extinguisher Cabinets D. Metal Gages: Provide manufacturer's standard gages for cabinets specified. E. Construction: Mitered and welded one-piece tubular door frames; weld joints and grind smooth; manufacturer's standard steel box with white baked enamel interior finish and primed exterior finish. 1. Steel Doors and Trim: Manufacturer's standard, prime coat finished. 2. Doors: Break-glass type secured access, with inside latch and lock. 3. Door Hardware: Continuous hinge permitting door to open 180-degrees. PART 3 - EXECUTION 3.1 PREPARATION A. Examine substrates and conditions under which fire extinguisher cabinets are to be installed. B. Do not proceed with work until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Install cabinets in locations and at mounting height to comply with requirements of governing authorities; prepare recesses in walls as required. B. Securely fasten to structure, square and plumb, in accordance with manufacturer's instructions. 1. Wherever exact location of units is not shown, locate as directed by Architect. 3.3 IDENTIFICATION A. After installation and finishing is completed, silk screen or apply decal letters spelling "FIRE EXTINGUISHER" as applicable. B. Letter size, style and location as selected by Architect. END OF SECTION 497 MOORPARK CITY HALL TENANT IMPROVEMENT 06/07/2023 MOORPARK, CALIFORNIA 10 75 00 - 1 Metal Flagpoles SECTION 10 75 00 METAL FLAGPOLES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide embedded ground set cone tapered aluminum flagpoles with concealed halyard system, revolving truck, pulleys and fittings, and accessories as required for complete finished installation. 1.2 Related Requirements: a. Division 01 - General Requirements. b. Section 03 10 00 Concrete Formwork c. Section 03 20 00: Concrete Reinforcing d. Section 03 30 00: Cast In Place Concrete e. Section 32 13 13: Site Concrete Work. 1.3 REFERENCES A. National Association of Architectural Metal Manufacturers (NAAMM): Guide Specifications for Design of Metal Flagpoles. 1.4 SUBMITTALS A. Product Data: Submit manufacturer's literature. B. Shop Drawings: Indicate dimensions of pole, anchor requirements, all components, and sizes. C. Delegated Design: Submit footing design shop drawing and structural calculations prepared by California licensed structural or civil engineer. D. Samples: Submit pole finish, indicating polish, texture and color. 1.5 DELIVERY, STORAGE, AND HANDLING A. Spiral wrap flagpole with protective covering and pack in shipping tubes. 498 MOORPARK CITY HALL TENANT IMPROVEMENT 06/07/2023 MOORPARK, CALIFORNIA 10 75 00 - 2 Metal Flagpoles PART 2 - PRODUCTS 2.1 SYSTEMS MANUFACTURERS A. Interstate Pole Industries (IPI) Basis of Design B. Morgan Francis Flagpoles and Accessories. C. American Flagpole, Division of Kearney-National Inc. D. Concord Industries, Inc. E. John Ewing & Co. Inc. F. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide embedded ground set cone tapered aluminum flagpoles with concealed halyard system, revolving truck, pulleys and fittings, and accessories. B. Performance Criteria: Flagpole system shall resist 115 mph wind velocity without permanent deformation, and non-resonant. 1. Comply with NAAMM Guide Specifications for Design of Metal Flagpoles. C. Flagpoles: One-piece, cone tapered aluminum poles; conforming to NAAMM Metal Flagpole Manual. 1. Type: Embedded ground mounted type (minimum 6'-0" setting depth). 2. Nominal Height: 20'-0" tall, qty. (2) and 35’-0” tall, qty (1). 3. Outside Diameter: 7" Min. at butt, nominal 3" Min. at top. 4. Wall Thickness: Minimum 0.188". D. Aluminum: ASTM B221. 1. Finish: Manufacturer's standard clear satin anodized aluminum. E. Foundation Base: Embedded type concrete construction. B. Flash Collar/Base: As indicated; where not specifically indicated, as selected by Architect from manufacturer's standard flash collars and ornamental bases. F. Internal Halyard System: Manufacturer's standard stainless-steel aircraft cable system, revolving truck with stainless steel ball-bearings, non-fouling, heavy duty winch with locked flush access door. 1. Provide bronze snap hooks. 2. Provide rubber covered counterweight. 499 MOORPARK CITY HALL TENANT IMPROVEMENT 06/07/2023 MOORPARK, CALIFORNIA 10 75 00 - 3 Metal Flagpoles 3. Provide braided sling. 4. Provide two removable crank handles. G. Lightning Ground Rod: Minimum 10" long copper rod, 3/4" diameter. H. Lightning Ground Cable: Copper No. 6 AWG stranded, soft drawn. I. Asphaltic Paint: Bituminous coating, black color. PART 3 - EXECUTION 3.1 PREPARATION A. Install concrete foundations for flagpoles correctly sized and positioned. B. Coat portions of flagpole below grade and in contact with dissimilar materials with asphaltic paint. 3.2 INSTALLATION A. Install flagpole, base assembly and fittings in accordance with manufacturer's recommendations and installation instructions and as indicated on drawings. B. Ground flagpole installations. C. Check and adjust installed fittings for smooth operation. D. Instruct Owner's representative in maintenance and operation. END OF SECTION 500 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 12 93 00 - 1 Site Furnishings SECTION 12 93 00 SITE FURNISHINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. The extent of work in this Section includes the provision and installation of the site furnishing equipment and structures with all miscellaneous hardware, foundations and appurtenances required for installation. B. The general extent of work for this Section is shown on the drawings and includes, but is not limited to, the following: 1. Trash Receptacle and Recycle Receptacle 2. Bike Rack 3. Flagpole 1.03 QUALITY ASSURANCE A. All manufactured items shall be inspected and approved upon delivery. B. Unless otherwise specified, install all materials in accordance with manufacturer’s recommendations. 1.04 SUBMITTALS A. Product Data: Submit manufacturer's technical data and installation instructions for site furnishings conforming to requirements of Division 1 requirements for Submittal Procedures. B. Product Warranty, spare or replacement parts, and/or care instructions shipped with components shall be delivered to Owner prior to substantial completion. 1.05 DELIVERY, STORAGE AND HANDLING: A. Store and handle products so as not to impede the work of others. B. Protect products from damage or theft during delivery, handling, storage and installation. PART 2 - PRODUCTS 501 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 12 93 00 - 2 Site Furnishings 2.01 MATERIALS Description Manufacturer Model # 1. Trash Receptacle and Recycle Receptacle DUMOR 107-32-RC-0017 & 107-32-RC-001 2. Bike Racks ANOVA CIRCLEBRS2 3. Flagpoles IPI POLES IPIHD-30-6-3.5-188 Model and manufacturer specified for play structures are school district standard. Substitutions will not be allowed. The contractor shall purchase touch-up paint for each color of powder coated products for use as needed after installation. Deliver un-used touch-up paint to Owner prior to substantial completion. PART 3 - EXECUTION 3.01 SEQUENCING AND SCHEDULING: A. Coordinate construction timing with installation of site furnishings in conformance with other pertinent Sections of the Specifications. 3.02 INSTALLATION A. Site Furnishings: Install where shown on drawings, as detailed and per manufacturer instructions. All site furnishings shall be secured in a vandal resistant manner acceptable to the Architect. B. Concrete Footings: Install footings with top of concrete sloped to drain at 1%. Install where shown on drawings and as detailed and per manufacturer's instructions. C. Sleeves: Install site furnishings, standards and posts into sleeves embedded into concrete bases for removal and replacement where indicated or detailed on drawings. 3.03 FIELD QUALITY CONTROL A. Site furnishings shall be inspected and accepted upon delivery by the Contractor. Final acceptance of site furnishings and locations of site furnishings shall be approved by Owner’s Representative in writing. END OF SECTION 502 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 12 93 00 - 3 Site Furnishings 503 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 03 - 1 THROUGH PENETRATION FIRESTOPPING SECTION 21 05 03 THROUGH PENETRATION FIRESTOPPING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Through-Penetration Firestopping. 1.2 REFERENCES A. UL 263 - Fire Tests of Building Construction and Materials B. UL 723 - Surface Burning Characteristics of Building Materials C. ANSI/UL 1479 - Fire Tests of Through Penetration Firestops D. UL 2079 - Tests for Fire Resistance of Building Joint Systems E. UL Fire Resistance Directory Through Penetration Firestop Systems (XHEZ) F. Intertek / Warnock Hersey - Directory of Listed Products G. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials H. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops I. NFPA 5000 - Building Construction Safety Code J. CBC California Building Code 1.3 DELIVERY, STORAGE, AND HANDLING A. Store, protect and handle products on site. Accept material on site in factory containers and packing. Inspect for damage. Protect from deterioration or damage due to moisture, temperature changes, contaminants, or other causes. Follow manufacturer's instructions for storage. B. Install material prior to expiration of product shelf life. 1.4 PERFORMANCE REQUIREMENTS A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. 504 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 03 - 2 THROUGH PENETRATION FIRESTOPPING 1. Fire-resistance-rated walls including fire partitions, fire barriers, and smoke barriers. B. For through-penetration firestop systems exposed to light, traffic, moisture, or physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. C. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84. D. For through-penetration firestop systems in air plenums, provide products with flame- spread and smoke-developed indexes of less than 25 and 50, respectively, as determined per ASTM E 84. E. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 1.5 MEETINGS A. Pre-installation meeting: A pre-installation meeting shall be scheduled and shall include the Construction Manager, General Contractor, all Subcontractors associated with the installation of systems penetrating rated walls. Firestopping Manufacturer's Representative, and the Owner. 1. Review foreseeable methods related to firestopping work. 2. Tour representative areas where firestopping is to be installed; inspect and discuss each type of condition and each type of substrate that will be encountered, and preparation to be performed by other trades. 1.6 WARRANTY A. Provide one year warranty on parts and labor. B. Warranty shall cover repair or replacement of firestop systems which fail in joint adhesion, cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, general durability, or appear to deteriorate in any manner not clearly specified by the manufacturer as an inherent quality of the material. 505 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 03 - 3 THROUGH PENETRATION FIRESTOPPING PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Products: Subject to compliance with requirements, provide one of the through- penetration firestop systems indicated for each application that are produced by one of the following manufacturers. All firestopping systems installed shall be provided by a single manufacturer. B. Manufacturers: 1. 3M; Fire Protection Products Division. 2. Hilti, Inc. 3. RectorSeal Corporation, Metacaulk. 4. Tremco; Sealant/Weatherproofing Division. 5. Johns-Manville. 6. Specified Technologies Inc. (S.T.I.) 7. Spec Seal Firestop Products 8. AD Firebarrier Protection Systems 9. Dow Corning Corp. 10. Fire Trak Corp. 11. International Protective Coating Corp. 2.2 THROUGH PENETRATION FIRESTOP SYSTEMS A. Provide materials and systems classified by or listed by Intertek / Warnock Hersey to provide firestopping equal to time rating of construction being penetrated. B. All firestopping materials shall be free of asbestos, lead, PCB's, and other materials that would require hazardous waste removal. C. Firestopping shall be flexible to allow for normal penetrating item movement due to expansion and contraction. D. Firestopping systems for plumbing and wet pipe sprinkler piping shall be moisture resistant. E. Provide firestopping systems capable of supporting floor loads where systems are exposed to possible floor loading or traffic. F. Provide firestopping systems allowing continuous insulation for all insulated pipes. G. Provide firestopping systems classified by UL or listed by Intertek / Warnock Hersey for penetrations through all fire rated construction. Firestopping systems shall be selected from the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory Category XHEZ based on substrate construction and penetrating item size and material and shall fall within the range of numbers listed: 1. Combustible Framed Floors and Chase Walls - 1 or 2 Hour Rated: a. F Rating = Floor/Wall Rating 506 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 03 - 4 THROUGH PENETRATION FIRESTOPPING 2. Non-Combustible Framed Walls - 1 or 2 Hour Rated: a. F Rating = Wall Rating b. L Rating = Penetrations in Smoke Barriers Penetrating Item UL System No. No Penetrating Item WL 0000-0999* Metallic Pipe or Conduit WL 1000-1999 Non-Metallic Pipe or Conduit WL 2000-2999 Electrical Cables WL 3000-3999 Cable Trays WL 4000-4999 Insulated Pipes WL 5000-5999 Bus Duct and Misc. Electrical WL 6000-6999 Duct without Damper and Misc. Mechanical WL 7000-7999 Multiple Penetrations WL 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. H. Any opening in walls or floors not covered by the listed series of numbers shall be coordinated with the firestopping manufacturer. I. Any openings in floors or walls not described in the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory, or outlined in manufacturer's information shall be sealed in a manner agreed upon by the Firestopping Manufacturer, Owner, and the Authority Having Jurisdiction. PART 3 - EXECUTION 3.1 EXAMINATION A. Ensure all surfaces that contact seal materials are free of dirt, dust, grease, oil, rust, or loose materials. Clean and repair surfaces as required. Remove laitance and form- release agents from concrete. B. Ensure substrate and penetrating items have been permanently installed prior to installing firestopping systems. Ensure penetrating items have been properly spaced and have proper clearance prior to installing firestopping systems. C. Surfaces to which sealing materials are to be installed must meet the selected UL or Intertek / Warnock Hersey system substrate criteria. D. Prime substrates where recommended in writing by through-penetration firestop system manufacturer. Confine primer to area of bond. 507 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 03 - 5 THROUGH PENETRATION FIRESTOPPING 3.2 INSTALLATION A. In existing construction, provide firestopping of openings prior to and after installation of penetrating items. Remove any existing coatings on surfaces prior to firestopping installation. Temporary firestopping shall consist of packing openings with fire resistant mineral wool for the full thickness of substrate, or an alternate method approved by the Authority Having Jurisdiction. All openings shall be temporarily firestopped immediately upon their installation and shall remain so until the permanent UL or listed by Intertek / Warnock Hersey listed firestopping system is installed. B. Install dams as required to properly contain firestopping materials within openings and as required to achieve required fire resistance rating. Remove combustible damming after appropriate curing. 3.3 CLEANING AND PROTECTING A. Clean excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not cause damage. B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements. 3.4 IDENTIFICATION A. Provide and install labels adjacent to each firestopping location. Label shall be provided by the firestop system supplier and contain the following information in a contrasting color: 1. The words "Warning - Through Penetration Firestop System - Do Not Disturb. Notify Building Management of Any Damage." 2. Firestop System Supplier; UL or listed by Intertek / Warnock Hersey system number; date installed; contractor name and phone number; manufacturer's representative name, address, and phone number. 3.5 INSPECTION A. All penetrations shall be inspected by the manufacturer's representative to ensure proper installation. B. Access to firestop systems shall be maintained for examination by the Authority Having Jurisdiction at their request. C. Proceed with enclosing through-penetration firestop system with other construction only after inspection reports are issued and firestop installations comply with requirements. 508 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 03 - 6 THROUGH PENETRATION FIRESTOPPING D. The contractor shall allow for visual destructive review of 5% of installed firestop systems (minimum of one) to prove compliance with specifications and manufacturer's instructions and details. Destructive system removal shall be performed by the contractor and witnessed by the engineer and manufacturer's factory representative. The engineer shall have sole discretion of which firestop system installations will be reviewed. The contractor is responsible for all costs associated with this requirement including labor and material for removing and replacing the installed firestop system. If any firestop system is found to not be installed per manufacturer's specific instructions and details, all firestop systems are subject to destructive review and replacement at the engineer's discretion and the contractor's expense. END OF SECTION 21 05 03 509 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 05 - 1 FIRE SUPPRESSION DEMOLITION FOR REMODELING SECTION 21 05 05 FIRE SUPPRESSION DEMOLITION FOR REMODELING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Fire Suppression Demolition. B. Cutting and Patching. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT A. Materials and equipment shall be as specified in individual Sections. PART 3 - EXECUTION 3.1 EXAMINATION A. THE DRAWINGS ARE INTENDED TO INDICATE THE GENERAL SCOPE OF WORK AND DO NOT SHOW EVERY PIPE, DUCT, OR PIECE OF EQUIPMENT THAT MUST BE REMOVED. B. Where walls, ceilings, etc., are shown as being removed on general drawings, the Contractor shall remove all mechanical equipment, devices, fixtures, piping, ducts, systems, etc., from the removed area. C. Where ceilings, walls, partitions, etc., are temporarily removed and replaced by others, This Contractor shall remove, store, and replace equipment, devices, fixtures, pipes, ducts, systems, etc. D. Verify that abandoned utilities serve only abandoned equipment or facilities. Extend services to facilities or equipment that shall remain in operation following demolition. E. Coordinate work with all other Contractors and the Owner. Schedule removal of equipment to avoid conflicts. F. This Contractor shall verify all existing equipment sizes and capacities where equipment is scheduled to be replaced or modified, prior to ordering new equipment. 3.2 PREPARATION A. Disconnect fire protection systems in walls, floors, and ceilings scheduled for removal. 510 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 05 - 2 FIRE SUPPRESSION DEMOLITION FOR REMODELING 3.3 DEMOLITION AND EXTENSION OF EXISTING MECHANICAL WORK A. Remove, relocate, and extend existing installations to accommodate new construction. B. Remove abandoned piping to source of supply and/or main lines. C. Remove exposed abandoned pipes, including abandoned pipes above accessible ceilings. Cut pipes above ceilings, below floors and behind walls. Cap remaining lines. Repair building construction to match original. Remove all clamps, hangers, supports, etc. associated with pipe and duct removal. D. Disconnect and remove mechanical devices and equipment serving equipment that has been removed. E. Repair adjacent construction and finishes damaged during demolition and extension work. F. Maintain access to existing mechanical installations which remain. Modify installation or provide access panels as appropriate. G. Extend existing installations using materials and methods compatible with existing installations, or as specified. 3.4 CUTTING AND PATCHING A. This Contractor is responsible for all penetrations of existing construction required to complete the work of this project. Refer to Section 21 05 29 for additional requirements. B. Penetrations in existing construction should be reviewed carefully prior to proceeding with any work. C. Penetrations shall be neat and clean with smooth and/or finished edges. Core drill where possible for clean opening. D. Repair existing construction as required after penetration is complete to restore to original condition. Use similar materials and match adjacent construction unless otherwise noted or agreed to by the Architect/Engineer prior to start of work. E. This Contractor is responsible for all costs incurred in repair, relocations, or replacement of any cables, conduits, or other services if damaged without proper investigation. 3.5 CLEANING AND REPAIR A. Clean and repair existing materials and equipment which remain or are to be reused. B. Clean all systems adjacent to project which are affected by the dust and debris caused by this construction. - 511 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 05 - 3 FIRE SUPPRESSION DEMOLITION FOR REMODELING C. FIRE PROTECTION ITEMS REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF THE OWNER. CONTRACTOR SHALL PLACE ITEMS RETAINED BY THE OWNER IN A LOCATION COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL DISPOSE OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN FOR MAINTENANCE PURPOSES. 3.6 SPECIAL REQUIREMENTS A. Review locations of all new penetrations in existing walls. Determine construction type and review for possible interferences. Bring all concerns to the attention of the Architect/Engineer before proceeding. END OF SECTION 21 05 05 512 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 1 FIRE SUPPRESSION SUPPORTS AND ANCHORS SECTION 21 05 29 FIRE SUPPRESSION SUPPORTS AND ANCHORS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Hangers, Supports, and Associated Anchors. B. Sleeves and Seals. C. Cutting of Openings. D. Escutcheon Plates and Trim. 1.2 QUALITY ASSURANCE A. Support Sprinkler Piping in conformance with NFPA 13. 1.3 REFERENCES A. MSS SP-58 - Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation. B. MSS SP 69 - Pipe Hangers and Supports - Selection and Application. C. MSS SP 89 - Pipe Hangers and Supports - Fabrication and Installation Practices. D. MSS SP-127 - Bracing for Piping Systems Seismic-Wind-Dynamic Design, Selection, Application E. NFPA 13 - Standard for the Installation of Sprinkler Systems. 1.4 WORK FURNISHED BUT INSTALLED UNDER OTHER SECTIONS A. Furnish sleeves and hanger inserts to General Contractor for placement into formwork. PART 2 - PRODUCTS 2.1 SEISMIC RESTRAINTS A. Refer to Section 21 05 50 for additional requirements for seismic restraints. 513 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 2 FIRE SUPPRESSION SUPPORTS AND ANCHORS 2.2 HANGER RODS A. Hanger rods for single rod hangers supporting steel, copper, and CPVC piping shall conform to the following: Pipe Size Rod Size 4" and smaller 3/8" 5" 6", and 8" 1/2" 10" 5/8" 12" 3/4" B. Hanger rods and accessories used in mechanical spaces or otherwise dry areas shall have ASTM B633 electro-plated zinc finish. C. All hanger rods, nuts, washers, clevises, etc., in damp areas shall have ASTM A123 hot-dip galvanized finish applied after fabrication. This applies to the following areas: 2.3 PIPE HANGERS AND SUPPORTS A. General: 1. All pipe hangers, clamps, and supports shall conform to Manufacturers Standardization Society MSS-SP-58, 69, 89, and 127 (where applicable). B. Vertical Supports: 1. Support and laterally brace vertical pipes at every floor level in multi-story structures, and more frequently when required by applicable codes, but never at intervals over 15 feet. Support vertical pipes with riser clamps installed below hubs, couplings or lugs. Provide sufficient flexibility to accommodate expansion and contraction without compromising fire barrier penetrations and other fixed takeoff locations. a. Products: 1) Anvil Fig. 2) CT121 3) Cooper/B-Line Fig. 4) B3373CT 5) Erico Model 510 6) Nibco/Tolco Fib. 82 2. Wall supports shall be used where vertical height of structure exceeds minimum spacing requirements. Install wall supports at same spacing as hangers or strut supports along vertical length of pipe runs. C. Hangers and Clamps: 514 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 3 FIRE SUPPRESSION SUPPORTS AND ANCHORS 1. Hangers in direct contact with bare copper pipe shall include plastic pipe insert similar to Unistrut Cush-A-Clamp, Hydra-Zorb, Erico Cushion Clamp or Cooper Vibra-Clamp. 2. Unless otherwise indicated, hangers shall be as follows: a. Clevis Type: Service: Bare Metal Pipe, Rigid Plastic Pipe 1) Products: Bare Steel, Plastic or Insulated Pipe a) Anvil Fig. 260 b) Cooper/B-Line Fig. 3100 c) Erico Model 400 d) Nibco/Tolco Fig. 1. 2) Products: Bare Copper Pipe a) Anvil Fig. CT65 b) Cooper/B-Line Fig. B3104CT c) Erico Model 402 d) Nibco/Tolco Fig. 81. b. Adjustable Swivel Ring Type: Service: Bare Metal Pipe - 4 inches and Smaller 1) Products: Bare Steel Pipe a) Anvil Fig. 69 b) Cooper/B-Line Fig. B3170NF c) Erico Model FCN d) Nibco/Tolco Fig. 200. 2) Products: Bare Copper Pipe a) Anvil Fig. CT69 b) Cooper/B-Line Fig. B170CT c) Nibco/Tolco Fig. 202. 3. Support may be fabricated from U-channel strut or similar shapes. Piping less than 4" in diameter shall be secured to strut with clamps of proper design and capacity as required to maintain spacing and alignment. Strut shall be independently supported from hanger drops or building structure. Size and support shall be per manufacturer's installation requirements for structural support of piping. Clamps shall not interrupt piping insulation. 4. Strut used in mechanical spaces or otherwise dry areas shall have ASTM B633 electro-plated zinc finish. 5. Strut used in damp areas listed in hanger rods shall have ASTM A123 hot-dip galvanized finish applied after fabrication. 6. Unless otherwise indicated, pipe supports for use with struts shall be as follows: a. Clamp Type: Service: Bare Metal Pipe, Rigid Plastic Pipe 515 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 4 FIRE SUPPRESSION SUPPORTS AND ANCHORS 1) Clamps in direct contact with copper pipe shall include plastic pipe insert similar to Unistrut Cush-A-Clamp, Hydra-Zorb, Erico Cushion Clamp or Cooper Vibra-Clamp. 2) Pipes subject to expansion and contraction shall have clamps slightly oversized to allow limited pipe movement. 3) Products: Bare Steel, Plastic or Insulated Pipe a) Unistrut Fig. P1100 or P2500 b) Cooper/B-Line Fig. B2000 or B2400 c) Nibco/Tolco Fig. A-14 or 2STR. 4) Products: Bare Copper Pipe a) Cooper/B-Line; Fig. BVT D. Upper (Structural) Attachments: 1. Unless otherwise shown, upper attachments for hanger rods or support struts shall be as follows: a. Steel Structure Clamps: C-Type Wide Flange Beam Clamps (for use on top and/or bottom of wide flanges. Not permitted for use with bar-joists.) 1) Products: a) Anvil Fig. 92 b) Cooper/B-Line Fig. B3033/B3034 c) Erico Model 300 d) Nibco/Tolco 68. b. Scissor Type Beam Clamps (for use with bar-joists and wide flange): 1) Products: a) Anvil Fig. 228, 292 b) Cooper/B-Line Fig. B3054 c) Erico Model 360 d) Nibco/Tolco Fig. 329. c. Concentrically Loaded Open Web Joist Hangers (for use with bar joists): 1) Products: a) MCL. M1, M2 or M3 d. Concrete Inserts Single Rod Galvanized: 1) Products: a) Anvil Fig. 282 b) Cooper/B-Line Fig. B3014 516 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 5 FIRE SUPPRESSION SUPPORTS AND ANCHORS c) Erico Model 355 d) Nibco/Tolco Fig. 310 e. Concrete Inserts Continuous Strip Galvanized: 1) Products: a) Unistrut Corp P3200 Series b) Cooper/B-Line Fig. B22-J c) Erico CONCT f. Wood Anchors: Tension wood rod hanger for suspending 3/8" threaded rod. Zinc plated carbon steel. 1) Minimum allowable tension loads for Douglass Fir/Southern Pine: a) 3/8" diameter rod; 2-1/2" shank: 600 lb/590 lb. b) Load values are based on full shank penetration into wood member. Minimum edge distance 3/4". Minimum end distance 3-1/4". 2) Limitations: a) Truss: Do not hang from wood trusses without truss manufacturer or Structural Engineer™™s approval. b) Sheetrock/Gypsum Ceiling: When drilling through non-wood materials (e.g., sheet rock, gypsum, etc.), increase shank length by depth of non-wood materials. c) Plywood Flooring/Roofing: Do not hang from plywood floor or roofing. d) Spacing: Refer to wood structure spacing of hangers. 3) Products: a) Simpson RWV b) DeWALT c) ITI Sammys GT25 2.4 OPENINGS IN FLOORS, WALLS AND CEILINGS A. Exact locations of all openings for the installation of materials shall be determined by the Contractor and given to the General Contractor for installation or construction as the structure is built. B. Coordinate all openings with other Contractors. C. Hire the proper tradesman and furnish all labor, material and equipment to cut openings in or through existing structures, or openings in new structures that were not installed, or additional openings. Repair all spalling and damage to the satisfaction of the Architect/Engineer. 517 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 6 FIRE SUPPRESSION SUPPORTS AND ANCHORS D. Said cutting shall be at the complete expense of each Contractor. Failure to coordinate openings with other Contractors shall not exempt the Contractor from providing openings at Contractor's expense. E. Do not cut structural members without written approval of the Architect or Structural Engineer. Mode l Service Element Material Temperature Range S Standard (Stainless) EPDM -40°F to 250°F T Fire Seals (1 hour) Silicone -67°F to 400°F FS Fire Seals (3 hours) Silicone -67°F to 400°F OS Oil Resistant/Stainless Nitrile -40°F to 210°F 2.5 ESCUTCHEON PLATES AND TRIM A. Fit escutcheons to all insulated or uninsulated exposed pipes passing through walls, floors, or ceilings of finished rooms. B. Escutcheons shall be heavy gauge, cold rolled steel, copper coated under a chromium plated finish, heavy spring clip, rigid hinge and latch. 2.6 PIPE PENETRATIONS A. Seal all pipe penetrations. Seal non-rated walls and floor penetrations with grout or caulk. Backing material may be used. B. Seal fire rated wall and floor penetrations with fire seal system as specified. 2.7 PIPE ANCHORS A. Provide all items needed to allow adequate expansion and contraction of all piping. All piping shall be supported, guided, aligned, and anchored as required. B. Repair all piping leaks and associated damage. Pipes shall not rub on any part of the building. PART 3 - EXECUTION 3.1 FIRE SUPPRESSION SUPPORTS AND ANCHORS A. General Installation Requirements: 1. Install all items per manufacturer's instructions. 2. Coordinate the location and method of support of piping systems with all installations under other Divisions and Sections of the Specifications. 3. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welding. 518 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 7 FIRE SUPPRESSION SUPPORTS AND ANCHORS 4. Supports shall extend directly to building structure. Do not support piping from duct hangers. Do not allow lighting or ceiling supports to be hung from piping supports. B. Supports Requirements: 1. Install hangers and supports complete with lock nuts, clamps, rods, bolts, couplings, swivels, inserts and required accessories. 2. Hangers for horizontal piping shall have adequate means of vertical adjustment for alignment. C. Pipe Requirements: 1. Support all piping and equipment, including valves, strainers, and other specialties and accessories to avoid objectionable or excessive stress, deflection, swaying, sagging or vibration in the piping or building structure during erection, cleaning, testing and normal operation of the systems. 2. Do not, however, restrain piping to cause it to snake or buckle between supports or to prevent proper movement due to expansion and contraction. 3. Support piping at equipment and valves so they can be disconnected and removed without further supporting the piping. 4. Piping shall not introduce strains or distortion to connected equipment. 5. Parallel horizontal pipes may be supported on trapeze hangers made of structural shapes and hanger rods; otherwise, pipes shall be supported with individual hangers. 6. Trapeze hangers may be used where ducts interfere with normal pipe hanging. 7. Provide additional supports where pipe changes direction, adjacent to flanged valves and strainers, at equipment connections and heavy fittings. 8. Provide at least one hanger adjacent to each joint in grooved end steel pipe with mechanical couplings. D. Provided the installation complies with all loading requirements of truss and joist manufacturers, the following practices are acceptable: 1. Loads of 100 lbs or less may be attached anywhere along the top or bottom chords of trusses or joists with a minimum 3' spacing between loads. 2. Loads greater than 100 lbs. must be hung concentrically and may be hung from top or bottom chord, provided one of the following conditions is met: a. The hanger is attached within 6" from a web/chord joint. b. Additional L2x2x1/4 web reinforcement is installed per manufacturer's requirements. 3. It is prohibited to cantilever a load using an angle or other structural component that is attached to a truss or joist in such a fashion that a torsional force is applied to that structural member. 4. If conditions cannot be met, coordinate installation with truss or joist manufacturer and contact Architect/Engineer. 519 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 8 FIRE SUPPRESSION SUPPORTS AND ANCHORS E. After piping and insulation installation are complete, cut hanger rods back at trapeze supports so they do not extend more than 3/4" below bottom face of lowest fastener and blunt any sharp edges. F. Do not exceed the manufacturer's recommended maximum load for any hanger or support. G. Steel/Concrete Structure: Spacing of hangers shall in no case exceed the following: 1. Steel (All steel pipe unless otherwise noted): a. Maximum Spacing: 1) 1-1/4" & under: 12'-0" 2) 1-1/2" & larger: 15'-0" 2. Steel (Schedule 40 lightweight alternative): a. Maximum Spacing: 1) 3" & under: 12'-0" H. Steel/Concrete Structure: Spacing of hangers shall in no case exceed the following: 1. Steel: a. Maximum Spacing: 1) 1-1/4" & under: 7'-0" 2) 1-1/2": 9'-0" 3) 2": 10'-0" 4) 2-1/2": 11'-0" 5) 3": 12'-0" 6) 4" & larger: 12'-0" I. Wood Structure: Spacing of hangers shall not exceed the compressive strength of the insulation inserts, and in no case shall exceed the following: 1. Steel (Std. Weight or Heavier - Liquid Service): a. Maximum Spacing: 1) 1-1/4" & under: 7'-0" 2) 1-1/2": 9'-0" 3) 2": 10'-0" 4) 2-1/2": 11'-0" 5) 3": 12'-0" 6) 4" through 6": 12'-0"8": 9'-0"10": 6'-0"12": 4'-0" J. Installation of hangers shall conform to MSS SP-58, 69, 89, and applicable NFPA standards. 520 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 29 - 9 FIRE SUPPRESSION SUPPORTS AND ANCHORS END OF SECTION 21 05 29 521 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 50 - 1 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS SECTION 21 05 50 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Seismic Requirements. 1.2 REFERENCES A. California Building Code (CBC) B. ASHRAE - A Practical Guide to Seismic Restraint. C. Technical Manual 5-809-10, NAVFAC P-355, Air Force Manual 88-3, Chapter 13. D. ASCE 7-16, Chapter 13. E. SMACNA - Seismic Restraint Manual Guidelines for Mechanical Systems. F. NFPA 13 - Installation of Sprinkler Systems. 1.3 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, protect and handle products to site. Accept material on site in factory containers and packing. Inspect for damage. Protect from damage and contamination by maintaining factory packaging until installation. Follow manufacturer's instructions for storage. 1.4 DESIGN REQUIREMENTS A. This project is subject to the seismic bracing requirements of California Building Code. B. The following criteria are applicable to this project: 1. Risk Category: II 2. Seismic Importance Factor: IE = 1.5 3. Seismic Design Category: D 4. Component Amplification Factors (ap) and Component Response Modification Factors (Rp) shall be taken from Table 13.5-1 in ASCE 7-16 for the individual equipment or system being restrained. 5. Component Importance Factors (Ip) shall be taken from Section 13.1.3 in ASCE 7-16 for the individual equipment or system being restrained. 6. The total height of the structure and the height of the system to be restrained within the structure shall be determined in coordination with architectural plans and the General Contractor. 522 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 50 - 2 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS C. Forces shall be calculated with the above requirements and Equation 13.3-1, -2, and - 3 of ASCE 7-16, unless exempted by 13.1.4. D. Equipment shall meet California Building Code and ASCE 7 seismic qualification requirements in concurrence with ICC ES AC156 Acceptance Criteria for Seismic Qualification by Shake-Table Testing of Nonstructural Components and Systems. E. All seismic anchorage and bracing shall comply with the St. Louis County Rules & Regulations on Anchorage & Sway Bracing - Mechanical, Electrical & Plumbing (MEP) System Components. F. All seismic anchorage and bracing shall comply with FM Global Property Loss Prevention Data Sheet 1-11, Fire Following Earthquakes. 1.5 COORDINATION A. Coordinate layout and installation of seismic bracing with building structural systems and architectural features, and with mechanical, fire-protection, electrical and other building features in the vicinity. B. Coordinate concrete bases with building structural system. 1.6 WARRANTY A. Provide one-year warranty on parts and labor for manufacturer defects and installation workmanship. PART 2 - PRODUCTS 2.1 SUPPLIERS A. Following is a partial list of manufacturer/supplier contact information for seismic restraints: 1. B-Line Systems, Inc. (800) 851-7415, www.b-line.com. 2. Unistrut Corporation http://www.unistrut.us/ 3. Kinetics Noise Control (877) 457-2695, www.kineticsnoise.com. 4. Mason Industries, Inc. www.mason-ind.com. 5. Loos & Co., Inc. (800) 321-5667, www.loosnaples.com. 6. Tolco (909) 737-5599, www.tolco.com 7. ISAT 877.523.6060, www.isatsb.com 8. Vibro-Acoustics (416) 291-7371, https://virs.vibro-acoustics.com/ 2.2 SEISMIC DESIGN CRITERIA A. Definitions 1. Stay in Place: 523 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 50 - 3 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS a. All systems and equipment shall be anchored and restrained such that the anchoring system is intended not to fail and equipment and/or system components will not fall. 2. Remain Operational: a. Requirements for "Stay in Place" listed above shall be met. b. The following systems and associated equipment are intended not to fail externally or internally and are intended to remain operational. 1) Fire Protection 2) Plumbing 3) Heating 4) Cooling 5) Humidification 6) Air Handling 7) Exhaust 2.3 SEISMIC BRACING AND SUPPORT OF SYSTEMS AND COMPONENTS A. General: 1. Seismic restraint designer shall coordinate all attachments with the Structural Engineer of Record; refer to submittal requirements. 2. The seismic restraint design shall be based on actual equipment data obtained from manufacturer's submittals or the manufacturer. The equipment manufacturer shall verify and provide written certification the attachment points on the equipment can accept the combination of seismic, weight, and other imposed loads. 3. All seismic restraint devices shall be designed to accept without failure the forces calculated per the applicable building code. B. Friction from gravity loads shall not be considered resistance to seismic forces. C. Fire protection systems shall meet the requirements of NFPA-13 for the building seismic requirements. 2.4 MATERIALS A. Use the following materials for restraints: 1. Indoor Dry Locations: Steel, zinc plated. 2. Corrosive Locations: Stainless steel. 2.5 SEISMIC BRACING COMPONENTS A. Slotted Steel Channel: 1-5/8-by-1-5/8-inch cross section, formed from 0.1046-inch- thick steel, with 9/16-by-7/8-inch slots at a maximum of 2 inches o.c. in webs, and flange edges turned toward web. 524 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 50 - 4 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS 1. Materials for Channel: ASTM A 1011, GR 33. 2. Materials for Fittings and Accessories: ASTM A 635, ASTM A 576, or ASTM A 36. 3. Fittings and Accessories: Products of the same manufacturer as channels and designed for use with that product. 4. Finish: Baked, rust-inhibiting, acrylic-enamel paint applied after cleaning and phosphate treatment, unless otherwise indicated. B. Channel-Type Bracing Assemblies: Slotted steel channel, with adjustable hinged steel brackets and bolts. C. Cable-Type Bracing Assemblies: Zinc-coated, high-strength steel wire rope cable attached to steel thimbles, brackets, and bolts designed for cable service. 1. Wire Rope Cable: Comply with ASTM A 603. Use 49- or 133-strand cable with a minimum strength of 2 times the calculated maximum seismic force to be resisted. D. Hanger Rod Stiffeners: Slotted steel channels with internally bolted connections to hanger rod. PART 3 - EXECUTION 3.1 INSTALLATION A. Refer to the applicable code sections and Authority Having Jurisdiction for the exact seismic restraint requirements of piping, ductwork, conduit, equipment, etc. B. Layout of transverse and longitudinal bracing shall follow recommendations of approved design standards listed in Part 1 of this specification section. C. All seismic restraint systems shall be installed in strict accordance with the manufacturer's written instructions and all certified submittal data. D. Installation of seismic restraints shall not cause any change in position of equipment, piping, or ductwork, resulting in stresses or misalignment. E. No rigid connections between equipment and the building structure shall be made that degrade the noise and vibration-isolation system specified. F. Do not install any equipment, piping, duct, or conduit that makes rigid connections with the building unless isolation is not specified. G. Coordinate work with all other trades to avoid rigid contact with the building. Any conflicts with other trades that will result in rigid contact with equipment or piping due to inadequate space or other unforeseen conditions shall be brought to the Architect/Engineer's attention prior to specific equipment selection. 525 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 50 - 5 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS H. Prior to installation, bring to the Architect/Engineer's attention any discrepancies between the specifications and the field conditions, or changes required due to specific equipment selection. I. Bracing may occur from flanges of structural beams, upper truss cords of bar joists, cast in place inserts, or International Code Council approved seismic anchors for installation in concrete. J. Cable restraints shall be installed slightly slack to avoid short-circuiting the isolated suspended equipment, ductwork, piping, or conduit. K. Cable assemblies shall be installed taut on non-isolated systems. Solid braces may be used in place of cables on rigidly attached systems only. L. Do not install cables over sharp corners. M. Brace support rods when necessary to accept compressive loads. Welding of compression braces to the vertical support rods is not acceptable. N. Provide reinforced clevis bolts when required. O. The vibration isolation manufacturer shall furnish integral structural steel bases as required. Independent steel rails are not acceptable. P. Vertical pipe risers flexibly supported to accommodate thermal motion and/or pipe vibration shall be guided to maintain pipe stability and provide horizontal seismic restraint. Q. Seismic restraints shall be mechanically attached to the system. Looping restraints around the system is not acceptable. R. Do not brace a system to two different structures such as a wall and a ceiling. S. Provide appropriately sized openings in walls, floors, and ceilings for anticipated seismic movement. Provide fire seal systems in fire-rated walls. T. Exposed seismic supports in occupied areas shall be guarded or covered to protect occupants. U. Coordinate seismic bracing of architecturally exposed ductwork with the Architect/Engineer. 3.2 SEISMIC RESTRAINT EXCLUSIONS A. Refer to the applicable code sections and Authority Having Jurisdiction for allowable exclusions. END OF SECTION 21 05 50 526 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 53 - 1 FIRE SUPPRESSION IDENTIFICATION SECTION 21 05 53 FIRE SUPPRESSION IDENTIFICATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Identification of products installed under Division 21. 1.2 REFERENCES A. ANSI/ASME A13.1 - Scheme for the Identification of Piping Systems. PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. 3M B. Bunting C. Calpico D. Craftmark E. Emedco F. Kolbi Industries G. Seton H. W.H. Brady I. Marking Services. 2.2 MATERIALS A. All pipe markers (purchased or stenciled) shall conform to ANSI A13.1. Marker lengths and letter sizes shall be at least the following: OD of Pipe or Insulation Marker Length Size of Letters Up to and including 1-1/4" 8" 1/2" 1-1/2" to 2" 8" 3/4" 2-1/2" to 6" 12" 1-1/4" 8" to 10" 24" 2-1/2" Over 10" 32" 3-1/2" 527 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 53 - 2 FIRE SUPPRESSION IDENTIFICATION Plastic tags may be used for outside diameters under 3/4" B. Plastic Nameplates: Laminated three-layer phenolic with engraved black, 1/4" minimum letters on light contrasting background. C. Aluminum Nameplates: Black enamel background with natural aluminum border and engraved letters furnished with two mounting holes and screws. D. Plastic Tags: Minimum 1-1/2" square or round laminated three-layer phenolic with engraved, 1/4" minimum black letters on light contrasting background. E. Brass Tags: Brass background with engraved black letters. Tag size minimum 1-1/2" square or 1-1/2" round. F. Plastic Pipe Markers: Semi-rigid plastic, preformed to fit around pipe or pipe covering; indicating flow direction and fluid conveyed. G. Vinyl Pipe Markers: Colored vinyl with permanent pressure sensitive adhesive backing. H. Stencil Painted Pipe Markers: Use industrial enamel spray paint per ANSI Standard A13.1. Indicate fluid conveyed and flow direction. I. Underground Pipe Markers: Bright colored continuously printed plastic ribbon tape 6" wide by 3.5 mils thick, manufactured for direct burial, with aluminum foil core for location by non-ferric metal detectors and bold lettering identifying buried item. J. Tracer Wire: 1. Single copper conductors shall be solid or stranded annealed or hard uncoated copper per UL83 and ASTM requirements. Tracer tape or copper-coated steel wire is not acceptable. 2. Conductor shall be insulated with HMWPE as specified and applied in a concentric manner. The minimum at any point shall not be less than 90% of the specified average thickness in compliance with UL 83. 3. Tracer wire shall be continuously spark tested at 7500 Volts DC. Other electrical and mechanical tests shall be in accordance with UL 1581. PART 3 - EXECUTION 3.1 INSTALLATION A. Install all products per manufacturer's recommendations. B. Degrease and clean surfaces to receive adhesive for identification materials. C. Valves: 1. All valves (except shutoff valves at equipment) shall have numbered tags. 528 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 53 - 3 FIRE SUPPRESSION IDENTIFICATION 2. Provide or replace numbered tags on all existing valves that are connected to new systems or that have been revised. 3. Provide all existing valves used to extend utilities to this project with numbered tags. Review tag numbering sequence with the Owner prior to ordering tags. 4. Secure tags with heavy duty key chain and brass "S" link or with mechanically fastened plastic straps. 5. Attach to handwheel or around valve stem. On lever operated valves, drill the lever to attach tags. 6. Number all tags and show the service of the pipe. 7. Provide one Plexiglas framed valve directory listing all valves, with respective tag numbers, uses and locations. Mount directory in location chosen by the Architect/Engineer. 8. Provide one 36" x 24" (minimum Plexiglas framed piping schematic showing valve locations with respective tag numbers. Mount directory in location chosen by the Architect/Engineer. 9. Provide two sets of laminated 8-1/2" x 11" (letter size) copies of a valve directory listing all valves, with respective tag numbers, uses, and locations. The directory shall be reviewed by the Owner and Architect/Engineer prior to laminating final copies. Laminated copies shall have brass eyelet in at least one corner for easy hanging. 3.2 SCHEDULE A. Pipes to be marked shall be labeled with text shown as follows, regardless of which method or material is used: 1. FIRE PROTECTION WATER: White lettering; red background 2. SPRINKLER WATER: White lettering; red background 3. Tracer Wire - Water Pipe Lines: White lettering; green background 4. Tracer Wire - All other buried types: White lettering; green background END OF SECTION 21 05 53 529 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 1 FIRE PROTECTION SYSTEMS SECTION 21 13 02 FIRE PROTECTION SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe, Fittings, Valves, and Connections for Fire Protection System. B. Wet-Pipe Sprinkler System. 1.2 QUALITY ASSURANCE A. Equipment and Components: Bear UL/FM label or marking. B. Valves: Bear UL/FM label or marking. Provide manufacturer's name and pressure rating marked on valve body. Pressure rating shall match specified pipe system pressure rating. Remanufactured valves are not acceptable. C. Sprinkler design drawings submitted by the C16 Contractor , and signed and sealed by a Professional Engineer licensed in the state where the project is located. D. Fire sprinkler system pipefitters responsible for installing, altering, or repairing water- based fire protection systems will require certification by the California State Fire Marshal's office. 1.3 REFERENCES A. ANSI/ASME B16.1 - Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250, and 800. B. ANSI/ASME B16.3 - Malleable Iron Threaded Fittings, Class 150 and 300. C. ANSI/ASME B16.4 - Cast Iron Threaded Fittings, Class 125 and 250. D. ANSI/ASME B16.5 - Pipe Flanges and Flanged Fittings. E. ANSI/ASME B16.9 - Factory-made Wrought Steel Butt-Welding Fittings. F. ANSI/ASME B16.11 - Forged Steel Fittings, Socket-Welding and Threaded. G. ANSI/ASME B16.25 - Butt-Welding Ends. H. ANSI/ASME B36.10 - Welded and Seamless Wrought Steel Pipe. I. ANSI/ASME Section 9 - Welding and Brazing Qualifications. J. ANSI/ASTM A47 - Malleable Iron Castings. 530 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 2 FIRE PROTECTION SYSTEMS K. ANSI/ASTM A135 - Electric-Resistance-Welded Steel Pipe. L. ANSI/AWWA C110 - Ductile Iron and Gray Iron Fittings. M. ANSI/AWWA C151 - Ductile Iron Pipe, Centrifugally Cast. N. ASME - Boiler and Pressure Vessel Code - Section IX, Welding and Brazing Requirements. O. ASTM A153 - Pipe, Steel, Black and Hot-Dipped, Zinc-coated Welded and Seamless. P. AWS D10.9 - Specifications for Qualification of Welding Procedures and Welders for Piping and Tubing. Q. NFPA 101 - Life Safety Code, R. NFPA 13 - Standard for the Installation of Sprinkler Systems. S. NFPA 25 - Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. T. UL - Underwriter's Laboratory Fire Protection Equipment Directory. U. CBC California Building Code V. CFC California Fire Code 1.4 SUBMITTALS A. Submit shop drawings per Section 21 05 00. Indicate pipe materials, joining methods, supports, floor and wall penetration seals, sprinklers, equipment data and ratings, and hydraulic calculations. B. Submit detailed pipe and sprinkler layout and other calculations and forms as described in NFPA 13. C. Submit detailed working drawings and obtain review of them in the following order: 1. Engineer/Architect 2. Authority Having Jurisdiction 3. Architect/Engineer 4. Local Fire Department 5. Architect/Engineer D. Working drawings shall include piping and sprinkler layout, sprinkler types and ratings, sections and elevations at critical points. Show coordination with lighting, ductwork, and diffusers, and indicate basic flow and hydraulic design information, including main location and date that the test was taken. E. Submit electrical power/controls wiring diagrams and product data indicating general assembly, components, safety controls, and service connections. 531 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 3 FIRE PROTECTION SYSTEMS F. Provide the Owner with one copy of NFPA 25. Standard for the Inspection Testing and Maintenance of Water-based Fire Protection Systems. 1.5 EXTRA STOCK A. Provide metal storage cabinet, wrenches for each sprinkler type, and extra sprinklers per NFPA 13 and applicable building code. 1.6 DELIVERY, STORAGE, AND HANDLING A. Store valves and sprinklers in shipping containers, with labels in place. B. Provide temporary protective coating on iron and steel valves. C. Maintain temporary end caps and closures in place until installation. 1.7 SYSTEM DESCRIPTION A. Contractor shall design and install the following water-based fire protection systems for the areas noted on the contract documents: 1. Wet pipe sprinkler system(s) B. Sprinkler systems shall be designed and installed according to the following standard(s): 1. NFPA 13 - Standard for the Installation of Sprinkler Systems C. System design and installation shall include all requirements by the Authority Having Jurisdiction, local and state building codes, and Owner's insurance company in addition to the previously listed design standard(s). Those requirements shall take precedence over the contract documents in the case of discrepancies. D. Systems shall be hydraulically calculated in accordance with the applicable design standard(s). Contractor is responsible for final pipe sizing based on results from hydraulic calculations. Pipe sizing shown on drawings for service entrance and main risers is based off of field visit. 1.8 COORDINATION DRAWINGS A. Reference Coordination Drawings article in Section 21 05 00 for required fire protection systems electronic CAD drawings to be provided to Coordinating Contractor for inclusion into composite coordination drawings. 1.9 OPERATION AND MAINTENANCE DATA A. Submit manufacturers' operation and maintenance data. Include written maintenance data on components of system, servicing requirements, and record drawings. 532 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 4 FIRE PROTECTION SYSTEMS 1.10 JOB CONDITIONS A. Local fire authority or third-party consultant shall be contracted to determine the flow and pressure available at the service connection. The Fire Protection Contractor is responsible to verify this information and make all tests required. Base all pipe sizing and hydraulic calculations on flow test data no older than 12 months or as required by AHJ. PART 2 - PRODUCTS 2.1 PIPE AND FITTINGS - WET PIPE SPRINKLER SYSTEMS A. Piping - 2" and Under (Steel Pipe): 1. Design Pressure: 175 psig 2. Pipe: Schedule 40, black steel, ASTM A53, ASTM A795, UL/FM. Inner wall shall be coated with an anti-MIC (microbiologically influenced corrosion) coating. 3. 4. Fittings: a. Threaded: 1) Cast iron, Class 125, black, UL/FM, ANSI/ASME B16.4. 2) Malleable iron, Class 150, black, UL/FM, ANSI/ASME B16.3. 3) Ductile iron, Class 150, black, UL/FM, ANSI/ASME B16.3. b. Grooved: 1) Ductile iron housing ASTM A-536, Grade 65-45-12, UL/FM, enamel coating, Grade E (Type A) EPDM molded pressure-responsive gaskets suited for 40°°F to 150°°F. Carbon steel bolts and nuts. c. Flanged: 1) Cast iron, Class 125, black, UL/FM, ANSI/ASME B16.1. 5. Unions: Class 150 malleable iron, ANSI B16.39, ground joint with copper or copper alloy-to-iron seat. B. Piping - 2-1/2" and Above (Steel Pipe): 1. Design Pressure: 175 psig 2. Pipe: Schedule 10, black steel, ASTM A135, ASTM A795, UL/FM. Inner wall shall be coated with an anti-MIC (microbiologically influenced corrosion) coating. 3. Pipe: Lightweight Schedule 10 alternate, black steel, ASTM A135, ASTM A795, UL/FM. Inner wall shall be coated with an anti-MIC (microbiologically influenced corrosion) coating. 4. Pipe: Schedule 40, black steel ASTM A53, ASTM A795, UL/FM. Inner wall shall be coated with an anti-MIC (microbiologically influenced corrosion) coating. 5. Joints: Grooved. 533 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 5 FIRE PROTECTION SYSTEMS 6. Fittings: a. Grooved: 1) Ductile iron housing ASTM A-536, Grade 65-45-12, UL/FM, enamel coating, Grade E (Type A) EPDM molded pressure-responsive gaskets suited for 40°F to 150°F. Carbon steel bolts and nuts. b. Flanged: 1) Cast iron, Class 125, black, UL/FM, ANSI/ASME B16.1. 2.2 VALVES A. Provide handwheels for gate valves. Provide gear operators for butterfly valves. B. Provide all connections to match pipe joints. Valves shall be same size as pipe. 2.3 EQUIPMENT A. Equipment shall be as scheduled on the drawings. 2.4 RISER LABELING AND IDENTIFICATION A. Hydraulic nameplates shall be affixed to each riser and shall include the following minimum information: 1. Installation contractor 2. Date installed 3. Riser location 4. Number of sprinklers 5. Basis of design (density GPM/ft2 and area of coverage ft2 6. Water flow rate (GPM) and residual pressure (psi) at the base of riser 7. Hose stream allowance (GPM). 8. Occupancy classification 9. Commodity classification (If applicable) 10. Maximum storage height (if applicable) PART 3 - EXECUTION 3.1 INSTALLATION - PIPING A. General Installation Requirements: 1. Coordinate piping and sprinkler locations with all other trades. Ductwork, diffusers and light fixture locations shall have priority over sprinkler piping and sprinklers. 2. Ream pipe and tube ends to full inside diameter. Remove burrs. Remove scale and foreign material, inside and outside, before assembly. 3. Die cut screw joints with full cut standard taper pipe threads. 534 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 6 FIRE PROTECTION SYSTEMS 4. Coat threads with pipe joint compound or wrap with Teflon tape. 5. Locate piping to minimize obstruction of other work. 6. Route piping in concealed spaces above finished ceiling. 7. Use full and double lengths of pipe wherever possible. 8. Slope all piping for complete drainage. Install auxiliary drains for all trapped piping per NFPA 13. 9. Reducers are generally not shown. Where pipe sizes change at tee, the tee shall be the size of the largest pipe shown connecting to it. 10. Comply with manufacturer's installation instructions. B. Wall/Floor Penetration: 1. Seal pipes passing through walls with a wall seal per Section 21 05 29. Provide Schedule 40 galvanized sleeve at least 2 pipe sizes larger than the pipe. Sleeves through floors shall extend minimum 1.5" above finished floor. 2. Fire seal all pipe and sleeve penetrations (both wall and floor) to maintain fire separation required without restraining pipe. C. Installation Requirements in Electrical Rooms: 1. Do not install piping or other equipment above electrical switchboards or panelboards. This includes a dedicated space extending 25 feet from the floor to the structural ceiling with width and depth equal to the equipment. Fire protection equipment dedicated to the electrical equipment room or space may be installed above equipment if other alternatives are not available. D. Hangers and Supports: 1. Provide hangers and supports as required by NFPA 13 and UL/FM, with the following exceptions: a. Do not use powder driven devices, explosive devices, wooden plugs, or plastic inserts. b. Do not install fasteners to carry the load in tension, unless absolutely necessary. 2. Seismic supports shall be designed using Tolbrace by Tolco, or equivalent program accounting for Fp and Cp factors for 2-way and 4-way bracing. Seismic zone of influence shall be shown on the drawings to support these calculations. Tolbrace details shall also be included in the drawings. E. Exposed Piping: 1. Install chrome plated steel escutcheons where exposed pipes penetrate walls or floors. 2. Remove all scale, rust, dirt, oils, stickers and thoroughly clean exterior of all bare metal exposed piping, hangers, and accessories in preparation to be painted. 3.2 INSTALLATION - VALVES A. Install gate valves with stems upright or horizontal, not inverted. 535 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 7 FIRE PROTECTION SYSTEMS B. Shutoff Valve: 1. Provide drain valves at main shutoff valves, low points of piping and apparatus. 2. Provide monitor switches on all shutoff valves. 3.3 INSTALLATION - EQUIPMENT A. Coordinate piping and sprinkler locations with all other trades. Ductwork, diffusers and light fixture locations shall have priority over system equipment and sprinklers. B. Alarm Bell: 1. Locate outside alarm bell on building wall as shown on fire alarm drawings. 2. Wire all bells, flow switches and supervisory switches to fire alarm system. All wiring shall be in conduit and meet the requirements of the electrical specifications. C. Test Valves: 1. Install test valves where required. Pipe to outdoors or drain. Test connection shall have flow equivalent to the smallest K-factor sprinkler. D. Sprinklers: 1. Locate sprinklers to clear lights, ducts and diffusers. Do not run sprinkler pipes through ducts. Ductwork has priority over sprinkler pipes. Offset pipes as needed. 2. Center sprinklers in two directions in ceiling tiles and provide offsets as required. 3. Do not allow concealed sprinkler cover plates to be painted. Sprinkler cover plates are to be factory painted only. Do not field paint. 4. Apply strippable or paper covers so concealed sprinkler cover plates do not receive field paint finish. 3.4 SYSTEMS CLEANING AND TESTING A. General Requirement: 1. All water used for testing and remaining in the piping system shall be obtained from a potable water source. B. Interior Piping: 1. Verify adequate water flow at the inspector's test connection. 2. Flush all interior piping to remove scale and other foreign material before placing system into service. 3. Hydrostatically test the entire interior piping system at a minimum of 200 psig or 50 psig more than the normal system working pressure for systems subjected to pressures more than 150 psig. Maintain test pressure for 2 hours without loss of pressure. 536 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 13 00 - 8 FIRE PROTECTION SYSTEMS C. Fire Alarm System: 1. Test the alarm system by operating the inspector's test connection or the alarm test valves. Verify that the building fire alarm system activates. 2. Adjust all monitor switches for proper operation. END OF SECTION 21 13 00 537 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 1 CLEAN AGENT FIRE SUPPRESSION SYSTEM SECTION 21 22 00 CLEAN AGENT FIRE SUPPRESSION SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Control and Supervision System. B. Novec 1230 Storage and Distribution Suppression System or Equal. 1.2 QUALITY ASSURANCE A. Source Limitation: Obtain extinguishing agent and equipment through one source, including the detection and release equipment. B. Perform work in accordance with ANSI/NFPA 2001, ANSI/NFPA 70 and ANSI/NFPA 72, applicable FM standards, and requirements of applicable codes and ordinances. C. Extinguishing agent shall be in a virgin state as produced by the manufacturer. Recycled agent is not allowed. D. Indicate manufacturer's name and pressure rating on valve bodies. Indicate manufacturer, type, size, part number, orifice code, or orifice diameter on discharge nozzles. Markings shall be standard and visible after installation. E. Welding Materials and Procedures: Conform to ANSI/ASME SEC 9 and applicable state labor regulations. F. ASME Compliance: Fabricate piping to comply with ASME B31.1, "Power Piping." G. FM Global Compliance: Provide components that are FM approved and are listed in FM's "Fire Protection Approval Guide." H. UL Compliance: Provide equipment components complying with UL 1058 listed for clean-agent extinguishing system units in UL's "Fire Protection Equipment Directory." I. See 21 05 00 for submittal requirements. 1.3 REFERENCES A. All requirements of Authority Having Jurisdiction (AHJ). B. ANSI/ASME B16.3 - Malleable Iron Threaded Fittings Class 300. C. ANSI/ASME B16.9 - Factory Made Wrought Steel Butt-Welding Fittings. D. ANSI/ASME B31.1 - Power Piping. 538 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 2 CLEAN AGENT FIRE SUPPRESSION SYSTEM E. ANSI/ASME SEC 8 - Pressure Vessels. F. ANSI/ASME SEC 9 - Welding and Brazing Qualifications. G. ANSI/AWS D1.1 - Structural Welding Code. H. ANSI/NFPA 70 - National Electrical Code. I. ANSI/NFPA 72 - National Fire Alarm Code. J. ANSI/NFPA 75 - Standard for the Protection of Electronic Computer/Data Processing Equipment K. ANSI/NFPA 101 - Life Safety Code. L. ANSI/NFPA 2001 - Clean Agent Fire Extinguishing Systems. M. ASME B40.1 - Gauges - Pressure Indicating Dial Type-C Elastic Element. N. ASTM A53 - Pipe, Steel, Black and Hot-Dipped Zinc Coated, Welded and Seamless. O. ASTM A106 - Seamless Carbon Steel Pipe for High-Temperature Service. P. ASTM A135 - Electric-Resistance-Welded Steel Pipe. Q. ASTM A234 - Pipe Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and Elevated Temperatures. R. UL - Fire Protection Equipment Directory. S. UL 393 - Indicating Pressure Gauges for Fire and Protection Services. T. UL 404 - Gauges, Indicating Pressure, for Compressed Gas Service. U. UL 2127 - Standard for Inert Gas Clean Agent Extinguishing System Units V. US Environmental Protection Agency, Protection of Stratospheric Ozone 59 FR 13044 (Final SNAP Ruling). 1.4 EXTRA MATERIALS A. Provide two spare detectors of each type installed. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver and store equipment in shipping containers with labeling in place. Deliver agent in approved containers. Protect from damage. B. Plugs and Cover Plates: Protect threaded ends, flanged ends, flanged openings, with gasketed metal cover plates to prevent damage during shipment and to prevent foreign materials from entering. Cap or plug drains, vents, small piping, and gauge connections. 539 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 3 CLEAN AGENT FIRE SUPPRESSION SYSTEM 1.6 SYSTEM DESCRIPTION A. Provide a complete clean agent fire suppression system including charged storage tanks, piping distribution, nozzles, control panel, wiring, annunciators, release and abort stations, alarm, and all other equipment necessary for a complete operational system. B. Design, fabrication, and installation shall comply with requirements and recommendations of ANSI/NFPA 2001. C. Acceptable Halocarbon Clean Agents: 1. Extinguishing Agent: Novec 1230, Dodecafluoro-2-methylpentan-3-one. Novec 1230 is a trade name for FK-5-1-12 fire-extinguishing clean agent, manufactured by 3M. D. System designed and installed to provide fire-extinguishing capability by totally flooding the area shown on the drawings. E. The system(s) shall be actuated by a combination of ionization and photoelectric smoke detectors installed for maximum coverage of 250 sq. ft per detector. If HVAC supply airflow is one air change per minute or more, photoelectric detectors only shall be installed for maximum coverage of 125 sq. ft. per detector. F. The system shall be actuated by an air sampling smoke detection system provided by fire alarm contractor. Refer to Section 28 31 50 for more information. G. Detectors shall be cross-zoned detection requiring two detectors to be in alarm before release. H. The system shall be capable of being actuated by manual release stations located at exit. I. The use of ozone-depleting substances, such as chlorofluorocarbon (CFC), hydrochlorofluorocarbon (HCFC) or halon, is prohibited. 1.7 DESIGN REQUIREMENTS A. Provide sufficient extinguishing agent to extinguish fire. Consider the following when computing volume: 1. Volume of hazard area. 2. Specific volume of vapor. 3. Additional quantities needed to compensate for unclosable openings, pipe losses , and nitrogen dilution. 4. Forced ventilation, fan coast-down time and damper actuation time. 5. Server room air conditioning units will not operate during discharge. Unit fans will have a coast-down period (delay). 6. Mechanical fire/smoke damper controls. 7. Room temperature of the hazard space. 540 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 4 CLEAN AGENT FIRE SUPPRESSION SYSTEM 8. Elevation above sea level. 9. Other special conditions affecting extinguishing efficiency. B. Locate extinguishing agent supply and backup supply, if required, near each hazard area. C. Interface system with building fire alarm system. 1.8 PERFORMANCE REQUIREMENTS A. Design system for Class A or C fires as appropriate for areas being protected and include safety factor. Use clean agent indicated and in concentration suitable for occupied areas. B. Halocarbon Clean Agents: 1. Novec 1230: Provide total flooding of 5.0% Novec 1230 minimum concentration by room volume for Class A fire protection or 5.2% Novec 1230 minimum concentration by room volume for Class C fire protection, in maximum 10 seconds at 70°°F for a 10-minute holding time. a. Novec 1230 concentration greater than 10% immediately after discharge or less than 4.2% throughout holding time will not be accepted without written authorization from Owner and Authorities Having Jurisdiction (AHJ). b. System Capabilities: Vapor pressure of 5.85 psig at 77°F. Super- pressurized with dry nitrogen to a working pressure of 360 psig at 70°F. Low pressure alarm shall activate at 290 psig. 1.9 QUALIFICATIONS A. Manufacturer: Company specializing in the manufacture of products specified in this section with minimum three years documented experience. B. Installer: Company specializing in installing the work of this section with minimum three years documented experience, approved by manufacturer, who maintains a recharging station and can provide replacement charge within 24 hours. 1.10 WARRANTY A. Provide one-year warranty for the entire system. Warranty shall include the replacement agent in the event of a false discharge. 1.11 MAINTENANCE SERVICE A. Conduct inspections six (6) and twelve (12) months from Date of Notice of Completion to verify proper operation of system and to check agent container weight and pressure. Include a thorough check of controls, detection and alarm systems. B. Submit documents certifying satisfactory system conditions. Include manufacturer's certificate of acceptance of inspector's qualifications. 541 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 5 CLEAN AGENT FIRE SUPPRESSION SYSTEM PART 2 - PRODUCTS 2.1 CLEAN AGENT FIRE SUPPRESSION SYSTEM MANUFACTURERS A. Manufacturers: 1. Fenwal Protection Systems 2. Kidde Fire Systems 3. Siemens Fire Products 4. Chemetron Fire Systems 5. Fike Corporation; Fire Protection Systems Division 6. Ansul Fire Protection 2.2 PIPE AND PIPING SPECIALTIES A. Steel Pipe (All Sizes) (Downstream of Orifice Union): 1. Pipe: ASTM A53 or A106, Schedule 40, black. 2. Fittings: ASTM A-197 Malleable Iron Class 300 or ASTM A234 forged steel welding type fittings for all sizes. 3. Joints: Screwed or ANSI/AWS D1.1 welded. B. Steel Pipe - 2-1/2" and Over (Downstream of Orifice Union): 1. Pipe: Standard weight black steel, mechanically coupled grooved type, ASTM A53. 2. Joints: Mechanically coupled grooved type with EPDM gaskets. (Machined groove only. Rolled grove fittings are not allowed). 3. Fittings: Malleable iron, ASTM A47, Grade 32510, black, mechanically coupled grooved type. 4. Flanges: Grooved end, flanged adapter. C. Steel Pipe - Between Storage Tanks and Orifice Union: 1. Pipe: ASTM A53 or A106, Schedule 80, black. 2. Joints: Flanged, ASME B16.5, Class 600. 3. Fittings: Forged-steel Welding Fittings: ASME B16.11, Class 3000, socket pattern. D. Valves: 1. General: Brass, suitable for intended operation. 2. Container Valves: With rupture disc or electric solenoid, capable of immediate and total agent discharge and suitable for intended flow capacity. 3. Valves in Sections of Closed Piping and Manifolds: Fabricate to prevent entrapment of liquid or install valve and separate pressure-relief devices. 4. Valves in Manifolds: Check valve, installed, to prevent loss of extinguishing agent when container is removed from manifold. E. Ordinary cast iron pipe, steel pipe conforming to ASTM A-120 or non-metallic pipe shall not be used. 542 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 6 CLEAN AGENT FIRE SUPPRESSION SYSTEM F. Pipe Hangers: UL listed for sprinkler systems, split clamp up to 2-1/2" size, riser clamps over 2-1/2" size. G. Escutcheons: Chrome plated pressed or stamped brass, one-piece or split pattern, minimum 2" larger than opening. H. Gauges: ASME B40.1 diameter cast aluminum case, phosphor bronze bourdon tube, rotary brass movement, brass socket, front recalibration adjustment, black figures on white background, 1% mid-scale accuracy, scale calibrated in psi. 2.3 DISCHARGE NOZZLES A. Nozzles shall be UL listed and FM approved for installation below a 1'-0" to 12'-0" ceiling or plenum height with only a single layer of nozzles (not tiered). B. Select for required rates of discharge and coverage and to distribute agent uniformly throughout protected area. C. Provide one-piece chrome plated brass, stainless steel, or aluminum nozzle(s) with textured finish and female pipe thread integral on body. Direct discharge parallel to ceiling. D. Permanently mark nozzles for identification and to show equivalent single orifice diameter. 2.4 CLEAN AGENT CYLINDERS A. Design, fabricate, certify, and stamp cylinders in accordance with ANSI/ASME Boiler and Pressure Vessel Code, SEC 8 for unfired pressure vessels. Cylinders shall be standard model and size for ease of replacement and addition. Storage cylinders shall be constructed to meet or exceed the agent manufacturer's recommended tank working and test pressure. B. Fill cylinders with required clean agent. C. Identify cylinders with permanent plate specifying agent, tare and gross weight, pounds of agent, and pressurization level. Install so plate is visible and legible. D. Equip cylinders with pressure relief devices. E. For systems with more than one cylinder, provide discharge manifold and rack to secure each cylinder. Provide check valves between each cylinder discharge and manifold. F. Supply each storage container with a factory installed level indicator to determine agent content and pressure switch to indicate low tank pressure. The low-pressure switch shall be wired to the control panel to provide audible and visual "Trouble" alarm. G. Each inert gas cylinder must have a calibrated gauge on cylinder head. 543 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 7 CLEAN AGENT FIRE SUPPRESSION SYSTEM 2.5 ORIFICE UNIONS/NIPPLE ASSEMBLIES A. Description: UL-listed device with minimum 2000 psig pressure rating installed in the manifold to control flow and reduce pressure of Inergen gas in piping. 1. 2" and Smaller: Piping assembly with orifice, sized for system design requirements. 2. 2-1/2" and Larger: Piping assembly with nipple, size for system design requirements. 2.6 FIRE SUPPRESSION CONTROL PANEL, DETECTION, AND ALARM SYSTEM A. Manufacturers: 1. Fenwal Fire Protection Systems 2. Kidde Fire Systems 3. Siemens Fire Products 4. Chemtron Fire Systems Pyrochem 5. Fike Corporation 6. Fire Protection Systems Division. B. UL listed and FM approved as alarm and releasing device, with solid-state internal circuitry in NEMA ICS 6, Type 1 cabinet. C. Control Unit Panel: 1. Control Unit Panel: Modular construction. Surface wall-mounted enclosure, minimum 0.060 inch steel enclosure with provisions for electrical conduit connections into the sides and top. The door shall provide a key lock and shall include a glass or other transparent opening for viewing of all indicators. 2. Each loop (circuit) shall not be loaded over 80% of the maximum device capacity. For example, in the minimum system capacity column listed below, if the fire alarm manufacturer's system capacity of intelligent sensors per loop is 99 devices, then no more than 79 devices shall be wired on that loop. The minimum system capacity shall be as follows: a. Minimum Total Addressable Points: 99 b. Minimum Total Analog System Sensors: 99 3. Provide the following control panel features: a. Electrical contacts for shutting down fans, activating valves or dampers, and operating system electrical devices. b. Automatic switchover to standby power at loss of primary power. c. Storage container, low-pressure indicator. d. Cross zoned and counting zone detection. 544 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 8 CLEAN AGENT FIRE SUPPRESSION SYSTEM 4. Signal Line Circuit Board (SLC): a. Each board shall receive analog information for all intelligent analog sensors and shall process this information to determine normal, alarm, or trouble conditions. The analog information may also be used for automatic test and determination of maintenance requirements. b. Each board shall contain its own microprocessor and shall be provided to monitor and control each signaling line circuit loop of intelligent analog sensors and addressable modules. The system shall have the ability to detect duplicate addresses on each SLC loop. c. Circuits shall be Class A Style 6/7 or Class B Style 4. 5. Display: a. The board shall provide all controls and indicators used by the system operator and may also be used to program all control panel parameters. b. The board shall provide an alphanumeric array for display of custom alphanumeric labels for all intelligent analog sensors and addressable modules. It shall also provide indicators for AC Power, System Alarm, System Trouble, Display Trouble and Signal Silence. c. The board shall provide a touch key-pad with control capability to command all system functions and entry of any alphanumeric information. A minimum of three different passwords with three levels of security shall be supported to prevent unauthorized manual control or programming. 6. Memory: The CPU and display interface board shall be augmented by non- volatile field programmable memory. EPROM memory will also be allowed provided the memory is burned in with minimum expansion capability equal to the total system capacity of the panel. Memory shall not be lost upon primary and secondary power failure. Memory shall have the capacity to store event log of up to a minimum of 800 events. 7. Power Supply: a. Input power shall be 120 VAC, 60 Hertz. Output power shall be as noted on the device specifications. b. Adequate to supply 125% of all control panel and peripheral power needs as well as 125% of power required for all external audio-visual devices. The power supply may be increased as needed by adding additional modular expansion power supplies. Overcurrent protections shall be provided on all power outputs. c. All power supplies shall be designed and installed to meet UL and NFPA requirements for power-limited operation on all external initiating and indicating circuits. d. The power supply shall provide integral charger for use with internal batteries. Battery capacity shall be sufficient for operation of the entire system for 24 hours in a non-alarm state, followed by alarm mode for 10 minutes, plus 25% spare capacity for future devices. 545 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 9 CLEAN AGENT FIRE SUPPRESSION SYSTEM D. Maintenance Lock-Out Switch: 1. The maintenance lock-out switch shall be used to disable the fire suppression system during routine maintenance. 2. This switch shall be key operated, allowing removal of the key in either the "Normal" or "Lock-Out" position. A red indicator lamp on the switch assembly shall illuminate when in the "Lock-Out" position. The fire alarm control panel is to indicate a trouble condition when in the "Lock-Out" position. E. Initiation Devices: 1. Intelligent Analog Smoke Sensors: a. Sensors shall connect with two wires to one of the control panel loops. They shall use the photoelectric principal to measure smoke density and shall, on command from the control panel, send data to the panel representing the analog level of smoke density. b. Analog Ionization Type Sensor: It shall use the dual chamber ionization principle to measure smoke density and send data to the control panel representing the analog level of smoke density measured. c. Mount sensors, where shown on the drawings, on twist-lock bases with all mounting hardware provided. Provide a two-piece head/base design. d. The sensors shall have switches for address setting and shall store an internal identifying code that the control panel shall use to identify the type of sensor. e. Provide dual alarm and power indicators that flash under normal conditions and remain continuous under alarm or trouble conditions. Provide a connection for attachment of a remote indicator. 2. Addressable Manual Release Stations: a. Manual release stations shall connect with two wires to one of the control unit panel loops. They shall be single action, non-break glass type made of red painted metal. They shall notify the control panel of their state. b. Stations shall be semi-flush mounted where shown on the drawings, with all mounting hardware provided. c. Stations shall have double action push/pull levers to prevent accidental operation and shall lock on when manually pulled. Stations shall be restored to normal position only when reset with a key. d. Stations shall provide address setting means using rotary decimal or DIP switches. 3. Manual Abort Stations: a. Manual abort stations shall be momentary type switches and operate as 'dead man' switches, where the agent discharge sequence is interrupted as long as the station is active. b. Stations shall be flush surface mounted where shown on drawings, with all mounting hardware provided. c. Stations shall be engaged by manually pushing a large pushbutton switch and disengage when released. 546 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 10 CLEAN AGENT FIRE SUPPRESSION SYSTEM 4. Interface Modules: a. Interface modules shall connect with two wires to one of the control unit panel loops. They shall notify the control panel of the state of supervised dry contacts wired for Style D or Style B operation. b. Mount the modules in enclosures located in accessible service locations as near as possible to the devices controlled. Provide all mounting hardware. c. Modules shall have address setting means using rotary decimal or DIP switches. 5. Addressable Relays: a. Addressable relays represent addressable control points used primarily for the control of auxiliary devices as indicated on the drawings. Contractor to provide additional slave relay(s) as required, rated for the electrical load being controlled (Contractor to match voltage, amps, etc.). b. Relays shall connect directly to an SLC loop and receive power from a separate 24 VDC circuit. c. Mount relays in enclosures located in an accessible service location as near as possible to the device(s) being controlled, unless otherwise shown on the drawings. Provide all mounting hardware. d. Relays shall supply 24 VDC power to the device(s) being controlled, unless otherwise indicated on the drawings. 6. Pressure Operated Switches: a. The system shall include pressure-operated switches actuated by the agent discharge for monitoring by the control unit and the building fire alarm panel. b. The pressure-operated switch shall be wired into the Emergency Power Off (EPO) circuitry to shut down power in the event of an agent discharge. EPO wiring by the Electrical Contractor. c. The switches shall be UL listed for use with the clean agent suppression system. F. Notification Appliance Devices: 1. Audio Horn/Visual: NFPA 72 and ADA 4.28; semi-flush type fire alarm electronic horn. Sound Rating: 90 dBA at 10 feet. Alarm sound levels shall not exceed 120 dBA at 10 feet. Electronic horns shall be able to be field set to annunciate as a solid horn tone, ringing bell tone, hi-low chime, wail tone or hi-low whoop. Provide the housing and backbox with red housing with white lettered FIRE and clear high intensity xenon strobe or equivalent under a clear lens with 30 candela rating. Candela rating shall be visible from the outside of the device. The maximum pulse duration shall be 0.2 seconds with a maximum duty cycle of 40%. The flash rate shall be 1 Hz. Where more than two strobes are visible from any one location, the fire alarm visual devices shall be synchronized. 2. Alarm Bells: NFPA 72 and ADA 4.28; electric vibrating, 10 inch, with operating mechanism behind dome. Sound Rating: 81 dBA at 10 feet. Sound levels for alarm signals shall not exceed 120 dBA. 547 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 11 CLEAN AGENT FIRE SUPPRESSION SYSTEM 3. Rotating Flasher: Weatherproof yellow revolving beacon type. Provide with electronic piezo beeper with sound rating between 80 dBA and 91 dBA at 10 feet. 2.7 ANNUNCIATION A. Remote LCD Annunciators: 1. Communications and power to the annunciators shall be supervised. The annunciator shall receive power from the fire alarm control panel. 2. A single key switch shall enable all switches on the annunciator. 2.8 WIRING A. Fire alarm wiring/cabling shall be furnished and installed by the Contractor in accordance with the manufacturer's recommendations and pursuant to National Fire Codes. Cabling shall be UL listed and labeled as complying with NFPA 70, Article 760 for power-limited fire alarm signal service. B. Manufacturers of fire alarm cable: 1. Comtran Corp. 2. Helix/HiTemp Cables, Inc. 3. Rockbestos-Suprenant Cable Corp. 4. West Penn Wire/CDT. PART 3 - EXECUTION 3.1 SEQUENCES OF OPERATION A. The Fire Suppression Contractor is responsible to ensure proper operation. B. System Sequence: 1. Detection of a single detector or air sampling smoke detection system shall: a. Energize alarm bell. b. Close ductwork isolation and/or fire/smoke dampers. c. Open the room pressure relief damper. d. Signal building fire alarm system. 2. Detection of a second detector shall: a. Signal building fire alarm system. b. Activate audio horn/visual devices and de-energize alarm bell. c. Shut down power to computer room air-conditioning units and close dampers. d. Start time delay for up to 30 seconds (adjustable). 548 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 12 CLEAN AGENT FIRE SUPPRESSION SYSTEM 3. Activation of the manual fire suppression agent release shall: a. Signal building fire alarm system. b. Activate audio horn/visual devices and de-energize alarm bell (if operating). Annunciate the audio horn/visual devices with a distinctively faster pulse. c. Shut down power to computer room air-conditioning units and close ductwork isolation and/or fire/smoke dampers. d. Start time delay for 60 seconds (adjustable). 4. After completion of the time delay, the system shall: a. Release agent into protected area. b. If abort switch is engaged, delay release. c. Upon abort switch disengagement, release agent unless system has been cleared and reset. d. Shutdown all power to equipment in the hazard area via the pressure activated switch. e. Activate the visual alarm (rotating flashers) at the protected area's entrance door(s). C. Warning signs at the protected area's entrance doors shall read, "Warning - Do not enter room when warning light is flashing. Fire extinguishing system has been activated." Sign shall be engraved plastic laminate with 3/4" minimum letter height. D. The Fire Suppression Contractor shall test all sequences and submit test results to Engineer and Owner's representative. 3.2 EXAMINATION A. Verify that spaces are ready to receive work. B. Ensure enclosing walls are continuous above ceilings and below raised floors to allow required concentration to be maintained for required time to extinguish fire. C. Beginning of installation means installer accepts existing conditions. 3.3 INSTALLATION - GENERAL A. General Installation Requirements: 1. Install in accordance with manufacturer's recommendations and ANSI/NFPA 2001. 2. Paint in accordance with ANSI/NFPA 2001 requirements. Place directional arrows and system labels wherever piping changes direction and minimum 20 feet on straight runs. 3. Install engraved plastic instruction plate, detailing emergency procedures, at control panel and at each manual discharge and abort switch location. At control panel, identify control logic units, contacts, and major circuits with permanent nameplates. 4. Post warning signs at each entrance to the protected area. 549 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 13 CLEAN AGENT FIRE SUPPRESSION SYSTEM 5. Remove all scale, rust, dirt, oils, stickers and thoroughly clean exterior of all bare metal exposed piping, hangers, and accessories in preparation to be painted. B. Pipe Installation Requirements: 1. Ream pipe and tube ends. Remove burrs. Remove scale and dirt on inside and outside before assembly. Blow out pipe before nozzles or discharge devices are installed. 2. Route piping in orderly manner, plumb and parallel to building structure, and maintain gradient. Install piping to conserve building space, and not interfere with use of space and other work. All piping shall be concealed above ceilings, below floors or in walls. Piping to exposed nozzles shall be chrome plated. 3. Securely support piping per ANSI/ASME B31.1 with allowance for agent thrust forces and thermal expansion and contraction. 4. Install unions downstream of valves and at equipment connections. 5. At hazard area walls, pack space between pipe, pipe sleeve or surface penetration with mineral fiber with elastomer caulk to depth of 1/2". Provide escutcheons where exposed piping passes through walls, floors, and ceilings. Seal pipe penetrations of fire separations. C. Cylinder Location: 1. Secure cylinders to wall. Where manifolded, mount and support by rack. For each system, provide same size cylinders containing equal amounts of clean agent. 3.4 TESTING A. Testing and Inspection Requirements: 1. The completed clean agent fire suppression system piping shall be pneumatically tested in a closed circuit for a period of 10 minutes at 40 psig. At the end of 10 minutes, the pressure drop shall not exceed 20% of the test pressure. When pressurizing the piping, pressure shall be increased in 5 psi increments. A written report of the test results shall be provided to the Architect/Engineer. 2. The piping system shall be inspected in accordance with NFPA Standard 2001, Section 6-7.2.2 latest edition. 3. The equipment manufacturer's representative shall verify that all nozzles are installed in the correct location and that the area of coverage for each nozzle is within the approved range of the manufacturer's listings and approvals. The equipment manufacturers shall provide written certification to that effect. 4. The Fire Suppression Contractor shall provide a "puff test" of the completed piping system to certify to the Architect/Engineer that the piping network is free and clear of obstructions. The equipment manufacturers shall submit a procedure for approval prior to beginning the "puff test." The equipment manufacturers shall provide certified results of the testing to the Architect/Engineer signed by the equipment manufacturer's representative. 550 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 22 00 - 14 CLEAN AGENT FIRE SUPPRESSION SYSTEM 5. Conduct an enclosure integrity test in accordance with NFPA 2001, Appendix C, latest edition. Prior to conducting testing, the equipment manufacturers shall verify with the general equipment manufacturers that all contemplated enclosure penetrations have been completed and that all enclosure sealing has been accomplished. B. Certification Requirements: 1. Certified "as installed" piping isometric drawings and clean agent flow calculations shall be completed by the Fire Suppression Contractor prior to ordering clean agent discharge nozzles. The certified isometric drawing and clean agent flow calculations shall be stamped "CERTIFIED AS INSTALLED" and signed by the equipment manufacturer's representative. 2. The Fire Suppression Contractor shall provide certified volumetric calculations of the final as-built hazard enclosure to verify the clean agent design concentration. The certified volumetric calculations shall be stamped "CERTIFIED VOLUMETRIC CALCULATIONS" and signed by the equipment manufacturer's representative. 3. The equipment manufacturers shall perform a certified weight check of all clean agent storage containers prior to turning the system over to the Architect/Engineer. This weight check shall be accomplished by means other than the liquid level indicator installed in the container. The results of this weight check shall then be correlated to the liquid level indicator to form the basis for future testing. 4. The following shall not occur until construction is 100% complete and the Owner has provided written approval. a. Upon completion of all testing, the equipment manufacturers shall arm the system and leave it in 100% working order. END OF SECTION 21 22 00 551 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 1 BASIC FIRE SUPPRESSION REQUIREMENTS SECTION 21 05 00 BASIC FIRE SUPPRESSION REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Requirements applicable to all Division 21 Sections. Also refer to Division 01 - General Requirements. B. All materials and installation methods shall conform to the applicable standards, guidelines and codes referenced herein and within each specification section. 1.2 REFERENCES A. CCR California Code of Regulation B. CBC California Building Code C. CFC California Fire Code D. CEC California Electric Code E. CMC California Mechanical Code F. CPC California Plumbing Code G. California Title 24 - Building Energy Efficiency Standards H. SCAQMD South Coast Air Quality Management District I. Standard For Installation of Sprinkler System – NFPA 13, 2016 Edition (CA Amended) 1.3 SCOPE OF WORK A. This Specification and the associated drawings govern the furnishing, installing, testing and placing into satisfactory operation the Mechanical Systems. B. Each Contractor shall provide all new materials indicated on the drawings and/or in these specifications, and all items required to make the portion of the Mechanical Work a finished and working system. C. Separate contracts will be awarded for the following work: D. All work will be awarded under a single General Contract. The division of work listed below is for the Contractor's convenience and lists normal breakdown of the work. 552 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 2 BASIC FIRE SUPPRESSION REQUIREMENTS E. Separate contracts will be awarded for the following work. The division of work listed below is for the contractors' convenience and lists a normal breakdown of the work. Please refer to the Construction Manager's scope statements for complete scope of work description. F. Scope of Work: 1. Plumbing Work: Refer to Section 22 05 00 "Basic Plumbing Requirements". 2. Heating Work: Refer to Section 23 05 00 "Basic HVAC Requirements". 3. Air Conditioning and Ventilating Work: Refer to Section 23 05 00 "Basic HVAC Requirements". 4. Temperature Control Work: Refer to Section 23 05 00 "Basic HVAC Requirements". 5. Fire Protection Work shall include, but is not necessarily limited to: a. Extend existing wet pipe sprinkler system for areas noted on the drawings. b. Furnish all hydraulic calculations and working sprinkler drawings. c. Furnish and install seismic restraint and equipment designed for use in seismic conditions described in Section 21 05 50. d. Furnish and install firestopping systems for penetrations of fire-rated construction associated with this Contractor's work. e. Complete all applicable tests, certifications, forms, and matrices. f. Provide NOVEC 1230 system, or equal, in IT server room. g. Submit full set of plans for plan check approval, and update plans for permits. 1.4 DIVISION OF WORK BETWEEN MECHANICAL, ELECTRICAL & CONTROL CONTRACTORS A. Definitions: 1. "Mechanical Contractors" refers to the following: a. Plumbing Contractor. b. Heating Contractor. c. Air Conditioning and Ventilating Contractor. d. Temperature Control Contractor. e. Fire Protection Contractor. f. Testing, Adjusting, and Balancing Contractor. 2. Motor Control Wiring: The wiring associated with the remote operation of the magnetic coils of magnetic motor starters or relays, or the wiring that permits direct cycling of motors by means of devices in series with the motor power wiring. In the latter case the devices are usually single phase and are usually connected to the motor power wiring through a manual motor starter having "Manual-Off-Auto" provisions. 3. Control devices such as start-stop push buttons, thermostats, pressure switches, flow switches, relays, etc., generally represent the types of equipment associated with motor control wiring. 553 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 3 BASIC FIRE SUPPRESSION REQUIREMENTS 4. Motor control wiring is single phase and usually 120 volts. In some instances, the voltage will be the same as the motor power wiring. Generally, where the motor power wiring exceeds 120 volts, a control transformer is used to give a control voltage of 120 volts. 5. Temperature Control Wiring: The wiring associated with the operation of a motorized damper, solenoid valve or motorized valve, etc., either modulating or two-position, as opposed to wiring which directly powers or controls a motor used to drive equipment such as fans, pumps, etc. a. This wiring will be from a 120 volt source and may continue as 120 volt, or be reduced in voltage (24 volt) in which case a control transformer shall be furnished as part of the temperature control wiring. 6. Control Motor: An electric device used to operate dampers, valves, etc. It may be two-position or modulating. Conventional characteristics of such a motor are 24 volts, 60 cycles, 1 phase, although other voltages may be encountered. 7. Voltage is generally specified and scheduled as distribution voltage. Motor submittals may be based on utilization voltage if it corresponds to the correct distribution voltage. Distribution/Nominal Voltage Utilization Voltage 120 115 208 200 240 230 277 265 480 460 B. General: 1. The purpose of these Specifications is to outline the Electrical and Mechanical Contractor's responsibilities related to electrical work required for items such as temperature controls, mechanical equipment, fans, chillers, compressors and the like. The exact wiring requirements for much of the equipment cannot be determined until the systems have been selected and submittals reviewed. Therefore, the electrical drawings show only known wiring related to such items. All wiring not shown on the electrical drawings, but required for mechanical systems, is the responsibility of the Mechanical Contractor. 2. Where the drawings require the Electrical Contractor to wire between equipment furnished by the Mechanical Contractor, such wiring shall terminate at terminals provided in the equipment. The Mechanical Contractor shall provide complete electrical power/controls wiring diagrams and supervision to the Electrical Contractor and designate the terminal numbers for correct wiring. 3. All electrical work shall conform to the National Electrical Code. All provisions of the Electrical Specifications concerning wiring, protection, etc., apply to wiring provided by the Mechanical Contractor unless noted otherwise. 554 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 4 BASIC FIRE SUPPRESSION REQUIREMENTS 4. Control low (24V) and control line (120V) voltage wiring, conduit, and related switches and relays required for the automatic control and/or interlock of motors and equipment, including final connection, are to be furnished and installed under Divisions 21, 22 and 23. Materials and installation to conform to Class 1 or 2 requirements. 5. All Contractors shall establish utility elevations prior to fabrication and shall coordinate their material and equipment with other trades. When a conflict arises, priority is as follows: a. Light fixtures. b. Gravity flow piping, including steam and condensate. c. Electrical busduct. d. Sheet metal. e. Electrical cable trays, including access space. f. Sprinkler piping and other piping. g. Electrical conduits and wireway. 1.5 COORDINATION DRAWINGS A. Definitions: 1. Coordination Drawings: A compilation of the pertinent layout and system drawings that show the sizes and locations, including elevations, of system components and required access areas to ensure that no two objects will occupy the same space. a. Mechanical trades shall include, but are not limited to, mechanical equipment, ductwork, fire protection systems, plumbing piping, steam and steam condensate piping, and any item that may impact coordination with other disciplines. b. Electrical trades shall include, but are not limited to, electrical equipment, conduit 1.5" and larger, conduit racks, cable trays, pull boxes, raceway, busway, lighting, ceiling-mounted devices, and any item that may impact coordination with other disciplines. c. Technology trades shall include, but are not limited to, technology equipment, racks, conduit 1.5" and larger, conduit racks, cable trays, ladder rack, pull boxes, raceway, ceiling-mounted devices, and any item that may impact coordination with other disciplines. d. Maintenance clearances and code-required dedicated space shall be included. e. The coordination drawings shall include all underground, underfloor, in- floor, in chase, and vertical trade items. 2. The contractors shall use the coordination process to identify the proper sequence of installation of all utilities above ceilings and in other congested areas, to ensure an orderly and coordinated end result, and to provide adequate access for service and maintenance. 555 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 5 BASIC FIRE SUPPRESSION REQUIREMENTS B. Participation: 1. The contractors and subcontractors responsible for work defined above shall participate in the coordination drawing process. 2. One contractor shall be designated as the Coordinating Contractor for purposes of preparing a complete set of composite electronic CAD coordination drawings that include all applicable trades, and for coordinating the activities related to this process. The Coordinating Contractor for this project shall be the Mechanical Contractor. a. The Coordinating Contractor shall utilize personnel familiar with requirements of this project and skilled as draftspersons/CAD operators, competent to prepare the required coordination drawings. 3. Electronic CAD drawings shall be submitted to the City for addition of work by other trades. C. Drawing Requirements: 1. The file format and file naming convention shall be coordinated with and agreed to by all contractors participating in the coordination process and the Owner. a. Scale of drawings: 1) General plans: 1/4 Inch = 1 '-0" (minimum). 2) Mechanical, electrical, communication rooms, and including the surrounding areas within 10 feet: 1/2 Inch = 1'-0" (minimum). 3) Shafts and risers: 1/2 Inch = 1'-0" (minimum). 4) Sections of shafts and mechanical and electrical equipment rooms: 1/4 Inch = 1 '-0" (minimum). 5) Sections of congested areas: 1/2 Inch = 1'-0" (minimum). 2. Ductwork layout drawings shall be the baseline system for other components. Ductwork layout drawings shall be modified to accommodate other components as the coordination process progresses. 3. There may be more drawings required for risers, top and bottom levels of mechanical rooms, and shafts. 4. The minimum quantity of drawings will be established at the first coordination meeting and sent to the A/E for review. Additional drawings may be required if other areas of congestion are discovered during the coordination process. D. General: 1. Coordination drawing files shall be made available to the A/E and Owner's Representative. The A/E will only review identified conflicts and give an opinion, but will not perform as a coordinator. 2. A plotted set of coordination drawings shall be available at the project site. 3. Coordination drawings are not shop drawings and shall not be submitted as such. 556 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 6 BASIC FIRE SUPPRESSION REQUIREMENTS 4. The contract drawings are schematic in nature and do not show every fitting and appurtenance for each utility. Each contractor is expected to have included in the bid sufficient fittings, material, and labor to allow for adjustments in routing of utilities made necessary by the coordination process and to provide a complete and functional system. 5. The contractors will not be allowed additional costs or time extensions due to participation in the coordination process. 6. The contractors will not be allowed additional costs or time extensions for additional fittings, reroutings or changes of duct size, that are essentially equivalent sizes to those shown on the drawings and determined necessary through the coordination process. 7. The A/E reserves the right to determine space priority of equipment in the event of spatial conflicts or interference between equipment, piping, conduit, ducts, and equipment provided by the trades. 8. Changes to the contract documents that are necessary for systems installation and coordination shall be brought to the attention of the A/E. 9. Access panels shall preferably occur only in gypsum board walls or plaster ceilings where indicated on the drawings. a. Access to mechanical, electrical, technology, and other items located above the ceiling shall be through accessible lay-in ceiling tile areas. b. Potential layout changes shall be made to avoid additional access panels. c. Additional access panels shall not be allowed without written approval from the A/E at the coordination drawing stage. d. Providing additional access panels shall be considered after other alternatives are reviewed and discarded by the A/E and the Owner's Representative. e. When additional access panels are required, they shall be provided without additional cost to the Owner. 10. Complete the coordination drawing process and obtain sign off of the drawings by all contractors prior to installing any of the components. 11. Conflicts that result after the coordination drawings are signed off shall be the responsibility of the contractor or subcontractor who did not properly identify their work requirements, or installed their work without proper coordination. 12. Updated coordination drawings that reflect as-built conditions may be used as record documents. 1.6 SUBMITTALS A. Submittals shall be required for the following items, and for additional items where required elsewhere in the specifications or on the drawings. 1. Submittals list: Referenced Specification Section Submittal Item 21 05 00 Basic Fire Suppression Requirements 21 05 03 Fire Seal Systems 21 05 05 Fire Suppression Demolition For Remodel 21 05 29 Hangers and Supports 557 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 7 BASIC FIRE SUPPRESSION REQUIREMENTS Referenced Specification Section Submittal Item 21 05 50 Seismic Restraint Systems 21 05 53 Mechanical Identification 21 13 00 Sprinkler Systems B. General Submittal Procedures: In addition to the provisions of Division 01, the following are required: 1. Transmittal: Each transmittal shall include the following: a. Date b. Project title and number c. Contractor's name and address d. Division of work (e.g., plumbing, heating, ventilating, etc.) e. Description of items submitted and relevant specification number f. Notations of deviations from the contract documents g. Other pertinent data 2. Submittal Cover Sheet: Each submittal shall include a cover sheet containing: a. Date b. Project title and number c. Architect/Engineer d. Contractor and subcontractors' names and addresses e. Supplier and manufacturer's names and addresses f. Division of work (e.g., plumbing, heating, ventilating, etc.) g. Description of item submitted (using project nomenclature) and relevant specification number h. Notations of deviations from the contract documents i. Other pertinent data j. Provide space for Contractor's review stamps 3. Composition: a. Submittals shall be submitted using specification sections and the project nomenclature for each item. b. Individual submittal packages shall be prepared for items in each specification section. All items within a single specification section shall be packaged together where possible. An individual submittal may contain items from multiple specifications sections if the items are intimately linked (e.g., pumps and motors). c. All sets shall contain an index of the items enclosed with a general topic description on the cover. 558 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 8 BASIC FIRE SUPPRESSION REQUIREMENTS 4. Content: Submittals shall include all fabrication, erection, layout, and setting drawings; manufacturers' standard drawings; schedules; descriptive literature, catalogs and brochures; performance and test data; electrical power criteria (e.g., voltage, phase, amps, horsepower, kW, etc.) wiring and control diagrams; Short Circuit Current Rating (SCCR); dimensions; shipping and operating weights; shipping splits; service clearances; and all other drawings and descriptive data of materials of construction as may be required to show that the materials, equipment or systems and the location thereof conform to the requirements of the contract documents. 5. Contractor's Approval Stamp: a. The Contractor shall thoroughly review and approve all shop drawings before submitting them to the Architect/Engineer. The Contractor shall stamp, date and sign each submittal certifying it has been reviewed. b. Unstamped submittals will be rejected. c. The Contractor's review shall include, but not be limited to, verification of the following: 1) Only approved manufacturers are used. 2) Addenda items have been incorporated. 3) Catalog numbers and options match those specified. 4) Performance data matches that specified. 5) Electrical characteristics and loads match those specified. 6) Equipment connection locations, sizes, capacities, etc. have been coordinated with other affected trades. 7) Dimensions and service clearances are suitable for the intended location. 8) Equipment dimensions are coordinated with support steel, housekeeping pads, openings, etc. 9) Constructability issues are resolved (e.g., weights and dimensions are suitable for getting the item into the building and into place.). d. The Contractor shall review, stamp and approve all subcontractors' submittals as described above. e. The Contractor's approval stamp is required on all submittals. Approval will indicate the Contractor's review of all material and a complete understanding of exactly what is to be furnished. Contractor shall clearly mark all deviations from the contract documents on all submittals. If deviations are not marked by the Contractor, then the item shall be required to meet all drawing and specification requirements. 6. Submittal Identification and Markings: a. The Contractor shall clearly mark each item with the same nomenclature applied on the drawings or in the specifications. b. The Contractor shall clearly indicate the size, finish, material, etc. c. Where more than one model is shown on a manufacturer's sheet, the Contractor shall clearly indicate exactly which item and which data is intended. d. All marks and identifications on the submittals shall be unambiguous. 559 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 9 BASIC FIRE SUPPRESSION REQUIREMENTS 7. Schedule submittals to expedite the project. Coordinate submission of related items. 8. Identify variations from the contract documents and product or system limitations that may be detrimental to the successful performance of the completed work. 9. Reproduction of contract documents alone is not acceptable for submittals. 10. Incomplete submittals will be rejected without review. Partial submittals will only be reviewed with prior approval from the Architect/Engineer. 11. Submittals not required by the contract documents may be returned without review. 12. The Architect/Engineer's responsibility shall be to review one set of shop drawing submittals for each product. If the first submittal is incomplete or does not comply with the drawings and/or specifications, the Contractor shall be responsible to bear the cost for the Architect/Engineer to recheck and handle the additional shop drawing submittals. 13. Submittals shall be reviewed and approved by the Architect/Engineer before releasing any equipment for manufacture or shipment. 14. Contractor's responsibility for errors, omissions. or deviation from the contract documents in submittals is not relieved by the Architect/Engineer's approval. 15. Schedule shall allow for adequate time to perform orderly and proper review of submittals, including time for consultants and Owner if required, and resubmittals by Contractor if necessary, and to cause no delay in Work or in activities of Owner or other contractors. a. Allow at least two weeks for Architect's/Engineer's review and processing of each submittal. 16. Architect/Engineer reserves the right to withhold action on a submittal which, in the Architect/Engineer's opinion, requires coordination with other submittals until related submittals are received. The Architect/Engineer will notify the Contractor, in writing, when they exercise this right. C. Electronic Submittal Procedures: 1. Distribution: Email submittals as attachments to all parties designated by the Architect/Engineer, unless a web-based submittal program is used. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. Submittal file name: 21 XX XX.description.YYYYMMDD b. Transmittal file name: 21 XX XX.description.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 560 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 10 BASIC FIRE SUPPRESSION REQUIREMENTS 1.7 CHANGE ORDERS A. A detailed material and labor takeoff shall be prepared for each change order, along with labor rates and markup percentages. Change orders shall be broken down by sheet or associated individual line item indicated in the change associated narrative, whichever provides the most detailed breakdown. Change orders with inadequate breakdown will be rejected. B. Itemized pricing with unit cost shall be provided from all distributors and associated subcontractors. C. Change order work shall not proceed until authorized. 1.8 EQUIPMENT SUPPLIERS' INSPECTION A. The following equipment shall not be placed in operation until a competent installation and service representative of the manufacturer has inspected the installation and certified that the equipment is properly installed, adjusted and lubricated; that preliminary operating instructions have been given; and that the equipment is ready for operation: 1. Fire Seal Systems B. Contractor shall arrange for and obtain supplier's on-site inspection(s) at proper time(s) to assure each phase of equipment installation and/or connection is in accordance with the manufacturer's instructions. C. Submit copies of start-up reports to the Architect/Engineer and include copies of Owner's Operation and Maintenance Manuals. 1.9 PRODUCT DELIVERY, STORAGE, HANDLING & MAINTENANCE A. Exercise care in transporting and handling to avoid damage to materials. Store materials on the site to prevent damage. Keep materials clean, dry and free from harmful conditions. Immediately remove any materials that become wet or that are suspected of becoming contaminated with mold or other organisms. B. Keep all bearings properly lubricated and all belts properly tensioned and aligned. C. Coordinate the installation of heavy and large equipment with the General Contractor and/or Owner. If the Mechanical Contractor does not have prior documented experience in rigging and lifting similar equipment, he/she shall contract with a qualified lifting and rigging service that has similar documented experience. Follow all equipment lifting and support guidelines for handling and moving. D. Contractor is responsible for moving equipment into the building and/or site. Contractor shall review site prior to bid for path locations and any required building modifications to allow movement of equipment. Contractor shall coordinate the work with other trades. 561 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 11 BASIC FIRE SUPPRESSION REQUIREMENTS 1.10 WARRANTY A. Provide one-year warranty, unless otherwise noted, to the Owner for all fixtures, equipment, materials, and workmanship. B. The warranty period for all work in this Division of the specifications shall commence on the date of notice of completion, unless a whole or partial system or any separate piece of equipment or component is put into use for the benefit of any party other than the installing contractor with prior written authorization. In this instance, the warranty period shall commence on the date when such whole system, partial system or separate piece of equipment or component is placed in operation and accepted in writing by the Owner. C. Warranty requirements shall extend to correction, without cost to the Owner, of all Work found to be defective or nonconforming to the contract documents. The Contractor shall bear the cost of correcting all damage resulting from defects or nonconformance with contract documents. 1.11 INSURANCE A. Contractor shall maintain insurance coverage as set forth in Division 0 of these specifications. 1.12 MATERIAL SUBSTITUTION A. Where several manufacturers' names are given, the scheduled manufacturer is the basis for job design and establishes the quality required. B. Equivalent equipment manufactured by the other listed manufacturers may be used. Contractor shall ensure that all items submitted by these other manufacturers meet all requirements of the drawings and specifications and fits in the allocated space. When using other listed manufacturers, the Contractor shall assume responsibility for any and all modifications necessary (including, but not limited to structural supports, electrical connections, piping and ductwork connections and arrangement, plumbing connections and rough-in, and regulatory agency approval, etc.) and coordinate such with other contractors. C. Any material, article or equipment of other unnamed manufacturers which will adequately perform the services and duties imposed by the design and is of a quality equal to or better than the material, article or equipment identified by the drawings and specifications may be used if approval is secured in writing from the Architect/Engineer not later than ten days prior to the bid opening. D. This Contractor assumes all costs incurred as a result of using the offered material, article or equipment, on the Contractors part or on the part of other Contractors whose work is affected. 562 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 12 BASIC FIRE SUPPRESSION REQUIREMENTS PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 JOBSITE SAFETY A. Neither the professional activities of the Architect/Engineer, nor the presence of the Architect/Engineer or the employees and subconsultants at a construction site, shall relieve the Contractor and other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions of the work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Architect/Engineer and personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The Contractor is solely responsible for jobsite safety. The Architect/Engineer and the Architect/Engineer's consultants shall be indemnified and shall be made additional insureds under the Contractor's general liability insurance policy. 3.2 ARCHITECT/ENGINEER OBSERVATION OF WORK A. The Contractor shall provide seven (7) calendar days' notice to the Architect/Engineer prior to: 1. Placing fill over underground and underslab utilities. 2. Covering exterior walls, interior partitions and chases. 3. Installing hard or suspended ceilings and soffits. B. The Architect/Engineer will have the opportunity to review the installation and provide a written report noting deficiencies requiring correction. The Contractor's schedule shall account for these reviews and show them as line items in the approved schedule. C. Above-Ceiling Final Observation 1. All work above the ceilings must be complete prior to the Architect/Engineer's review. This includes, but is not limited to: a. Pipe wall penetrations are sealed. b. Pipe identification is installed. c. Branch piping in the location of sprinklers shall be dropped to the ceiling. 2. In order to prevent the Above-Ceiling Final Observation from occurring too early, the Contractor shall review the status of the work and certify, in writing, that the work is ready for the Above-Ceiling Final Observation. 3. It is understood that if the Architect/Engineer finds the ceilings have been installed prior to this review and prior to 7 days elapsing, the Architect/Engineer may not recommend further payments to the contractor until such time as full access has been provided. 563 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 13 BASIC FIRE SUPPRESSION REQUIREMENTS 3.3 OPERATION AND MAINTENANCE MANUALS A. General: 1. Provide an electronic copy of the O&M manuals as described below for Architect/Engineer's review and approval. The electronic copy shall be corrected as required to address the Architect/Engineer's comments. Once corrected, electronic copies and paper copies shall be distributed as directed by the Architect/Engineer. 2. Approved O&M manuals shall be completed and in the Owner's possession prior to Owner's acceptance and at least 10 days prior to instruction of operating personnel. B. Electronic Submittal Procedures: 1. Distribution: Email the O&M manual as attachments to all parties designated by the Architect/Engineer. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. O&M file name: O&M.div21.contractor.YYYYMMDD b. Transmittal file name: O&Mtransmittal.div21.contractor.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 6. All text shall be searchable. 7. Bookmarks shall be used, dividing information first by specification section, then systems, major equipment and finally individual items. All bookmark titles shall include the nomenclature used in the construction documents and shall be an active link to the first page of the section being referenced. C. Paper Copy Submittal Procedures: 1. Once the electronic version of the manuals has been approved by the Architect/Engineer, paper copies of the O&M manual shall be provided to the Owner. The content of the paper copies shall be identical to the corrected electronic copy. 564 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 14 BASIC FIRE SUPPRESSION REQUIREMENTS 2. Binder Requirements: The Contractor shall submit O&M manuals in heavy duty, locking three ring binders. Incorporate clear vinyl sheet sleeves on the front cover and spine for slip-in labeling. "Peel and stick" labels are not acceptable. Sheet lifters shall be supplied at the front of each notebook. The three-ring binders shall be 1/2" thicker than initial material to allow for future inserts. If more than one notebook is required, label in consecutive order. For example; 1 of 2, 2 of 2. No other form of binding is acceptable. 3. Binder Labels: Label the front and spine of each binder with "Operation and Maintenance Instructions", title of project, and subject matter. 4. Index Tabs: Divide information by specification section, major equipment, or systems using index tabs. All tab titling shall be clearly printed under reinforced plastic tabs. All equipment shall be labeled to match the identification in the construction documents. D. Operation and Maintenance Instructions shall include: 1. Title Page: Include title page with project title, Architect, Engineer, Contractor, all subcontractors, and major equipment suppliers, with addresses, telephone numbers, website addresses, email addresses and point of contacts. Website URLs and email addresses shall be active links in the electronic submittal. 2. Table of Contents: Include a table of contents describing specification section, systems, major equipment, and individual items. 3. Copies of all final approved shop drawings and submittals. Include Architect's/Engineer's shop drawing review comments. Insert the individual shop drawing directly after the Operation and Maintenance information for the item(s) in the review form. 4. Copy of final approved test and balance reports. 5. Copies of all factory inspections and/or equipment startup reports. 6. Copies of warranties. 7. Schematic electrical power/controls wiring diagrams of the equipment that have been updated for field conditions. Field wiring shall have label numbers to match drawings. 8. Dimensional drawings of equipment. 9. Capacities and utility consumption of equipment. 10. Detailed parts lists with lists of suppliers. 11. Operating procedures for each system. 12. Maintenance schedule and procedures. Include a chart listing maintenance requirements and frequency. 13. Repair procedures for major components. 14. List of lubricants in all equipment and recommended frequency of lubrication. 15. Instruction books, cards, and manuals furnished with the equipment. 3.4 INSTRUCTING THE OWNER'S REPRESENTATIVES A. Adequately instruct the Owner's designated representatives in the maintenance, care, and operation of all systems installed under this contract. B. Provide verbal and written instructions to the Owner's representatives by FACTORY PERSONNEL in the care, maintenance, and operation of the equipment and systems. 565 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 15 BASIC FIRE SUPPRESSION REQUIREMENTS C. Contractor shall make a DVD video recording of instructions to the Owner while explaining the system so additional personnel may view the instructions at a later date. The video recording shall be the property of the Owner. D. The Owner has the option to make a video recording of all instructions. Coordinate schedule of instructions to facilitate this recording. E. The instructions shall include: 1. Explanation of all system flow diagrams. 2. Maintenance of equipment. 3. Start-up procedures for all major equipment. 4. Explanation of seasonal system changes. 5. Description of emergency system operation. F. Notify the Architect/Engineer of the time and place for the verbal instructions to be given to the Owner's representative so a representative can attend if desired. G. Minimum hours of instruction for each item shall be: 1. Sprinkler System(s) - 2 hours. H. The Contractor shall prepare a detailed, written training agenda and submit it to the Architect/Engineer a minimum of two weeks prior to the formal training for approval. The written agenda shall include specific training points within the items described above. For example: how to adjust setpoints, troubleshooting, proper start-up, proper shut-down, seasonal changes, draining, venting, changing filters, changing belts, etc. Failure to provide and follow an approved training agenda may result in additional training required at the expense of the Contractor. I. Operating Instructions: 1. Contractor is responsible for all instructions to the Owner's representatives for the fire protection and control systems. 2. If the Contractor does not have staff that can adequately provide the required instructions the Contractor shall include in the bid an adequate amount to reimburse the Owner for the Architect/Engineer to perform these services. 3.5 SYSTEM STARTING AND ADJUSTING A. The fire protection systems shall be complete and operating. System startup, testing, adjusting, and balancing to obtain satisfactory system performance is the responsibility of the Contractor. This includes calibration and adjustments of all controls, noise level adjustments and final comfort adjustments as required. B. Complete all manufacturer-recommended startup procedures and checklists to verify proper motor rotation, electrical power voltage is within equipment limitations, equipment controls maintain pressures and temperatures within acceptable ranges, all filters and protective guards are in-place, acceptable access is provided for maintenance and servicing, and equipment operation does not pose a danger to personnel or property. 566 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 16 BASIC FIRE SUPPRESSION REQUIREMENTS C. All operating conditions and control sequences shall be tested during the start-up period. Test all interlocks, safety shutdowns, controls, and alarms. D. The Contractor, subcontractors, and equipment suppliers shall have skilled technicians to ensure that all systems perform properly. 3.6 RECORD DOCUMENTS A. The following paragraphs supplement Division 01 requirements. B. Maintain at the job site a separate and complete set of fire protection drawings and specifications with all changes made to the systems clearly and permanently marked in complete detail. C. Mark drawings to indicate revisions to piping size and location, both exterior and interior; including locations of other control devices, and other units requiring periodic maintenance or repair; actual equipment locations, dimensioned from column lines; actual inverts and locations of underground piping; concealed equipment, dimensioned from column lines; mains and branches of piping systems, with valves and control devices located and numbered, concealed unions located, and with items requiring maintenance located; Change Orders; concealed control system devices. D. Before completion of the project, a set of reproducible fire protection drawings will be given to the Contractor for transfer of all as-built conditions from the paper set maintained at the job site. All marks on reproducibles shall be clear and permanent. E. Mark specifications to show approved substitutions; Change Orders, and actual equipment and materials used. F. Record changes daily and keep the marked drawings available for the Architect/Engineer's examination at any normal work time. G. Upon completing the job, and before final payment is made, give the marked-up drawings to the Architect/Engineer. 3.7 PAINTING A. This Contractor shall paint the following items: 1. All piping in mechanical room B. Equipment in finished areas that will be painted to match the room decor will be painted by others. C. Equipment cabinets, casings, covers, metal jackets, etc., in equipment rooms or concealed spaces, shall be furnished in standard or prime finish, free from scratches, abrasions, chips, etc. 567 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 17 BASIC FIRE SUPPRESSION REQUIREMENTS D. Equipment in occupied spaces, or if standard to the unit, shall have a baked primer with baked enamel finish coat free from scratches, abrasions, chips, etc. If color option is specified or is standard to the unit, this Contractor shall, before ordering, verify with the Architect/Engineer the color preference and furnish this color. E. Paint all equipment in unfinished areas such as mechanical spaces, storage room, etc., furnished by this Contractor. Equipment furnished with a factory coat of paint and enamel need not be painted, provided the factory applied finish is not marred or spattered. If so, equipment shall be refinished with the same paint as was factory applied. F. Paint all outdoor uninsulated steel piping the color selected by Owner or Architect/Engineer. 3.8 ADJUST AND CLEAN A. Thoroughly clean all equipment and systems prior to the Owner's final acceptance of the project. Clean all foreign paint, grease, oil, dirt, labels, stickers, and other foreign material from all equipment. B. Clean all areas where moisture is present. Immediately report any mold, biological growth, or water damage. Follow mold remediation scope. C. Remove all rust, scale, dirt, oils, stickers and thoroughly clean exterior of all exposed piping, hangers, and accessories. D. Remove all rubbish, debris, etc., accumulated during construction from the premises. 3.9 SPECIAL REQUIREMENTS A. Contractor shall coordinate the installation of all equipment, valves, etc., with other trades to maintain clear access area for servicing. B. All equipment shall be installed in such a way to maximize access to parts needing service or maintenance. Review the final field location, placement, and orientation of equipment with the Owner's designated representative prior to setting equipment. C. Installation of equipment or devices without regard to coordination of access requirements and confirmation with the Owner's designated representative will result in removal and reinstallation of the equipment at the Contractor's expense. D. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 568 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 21 05 00 - 18 BASIC FIRE SUPPRESSION REQUIREMENTS 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. READINESS CERTIFICATION PRIOR TO FINAL JOBSITE OBSERVATION To prevent the final job observation from occurring too early, we require that the Contractor review the completion status of the project and, by copy of this document, certify that the job is indeed ready for the final job observation. The following is a typical list of items that represent the degree of job completeness expected prior to your requesting a final job observation. 1. Penetrations fire sealed and labeled in accordance with specifications. 2. Fire protection system operational. 3. Pipes labeled. Accepted by: Prime Contractor _______________________________________________ By ___________________________________ Date ___________________ Upon Contractor certification that the project is complete and ready for a final job observation, we require the Contractor to sign this agreement and return it to the Architect/Engineer so that the final observation can be scheduled. It is understood that if the Architect/Engineer finds the job not ready for the final observation and that additional trips and observations are required to bring the project to completion, the costs incurred by the Architect/Engineers for additional time and expenses will be deducted from the Contractor's contract retainage prior to final payment at the completion of the job. END OF SECTION 21 05 00 569 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 1 BASIC PLUMBING REQUIREMENTS SECTION 22 05 00 BASIC PLUMBING REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Requirements applicable to all Division 22 Sections. Also refer to Division 1 - General Requirements. B. All materials and installation methods shall conform to the applicable standards, guidelines and codes referenced herein and within each specification section. 1.2 REFERENCES A. CCR California Code of Regulation B. CBC California Building Code C. CFC California Fire Code D. CEC California Electric Code E. CMC California Mechanical Code F. CPC California Plumbing Code G. California Title 24 - Building Energy Efficiency Standards H. SCAQMD South Coast Air Quality Management District 1.3 SCOPE OF WORK A. This Specification and the associated drawings govern the furnishing, installing, testing and placing into satisfactory operation the Mechanical Systems. B. Each Contractor shall provide all new materials indicated on the drawings and/or in these specifications, and all items required to make the portion of the Mechanical Work a finished and working system. C. All work will be awarded under a single General Contract. The division of work listed below is for the Contractor's convenience and lists normal breakdown of the work. 570 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 2 BASIC PLUMBING REQUIREMENTS D. Scope of Work: 1. Plumbing Work shall include, but is not necessarily limited to: a. Extend existing domestic water piping system including cold, hot, and hot water circulating piping within the building. Insulate all piping as specified. b. Furnish and install condensate drain piping from plumbing related equipment. c. Extend existing sanitary sewer and vent system. d. Furnish and install plumbing fixtures, roof drains and related piping specified on fixture schedules on approved drawing set. e. Furnish and install seismic restraint and equipment designed for use in seismic conditions described in Section 22 05 50. f. Furnish and install firestopping systems for penetrations of fire-rated construction associated with this Contractor's work. g. Complete all applicable tests, certifications, forms, and matrices. 2. Heating Work: Refer to Section 23 05 00 "Basic HVAC Requirements". 3. Air Conditioning and Ventilating Work: Refer to Section 23 05 00 "Basic HVAC Requirements". 4. Temperature Control Work: Refer to Section 23 05 00 "Basic HVAC Requirements". 5. Fire Protection Work: Refer to Section 21 05 00 "Basic Fire Suppression Requirements". 6. Testing, Adjusting, and Balancing Work: Refer to Section 23 05 00 "Basic HVAC Requirements". 1.4 DIVISION OF WORK BETWEEN MECHANICAL, ELECTRICAL & CONTROL CONTRACTORS A. Definitions: 1. "Mechanical Contractors" refers to the following: a. Plumbing Contractor. b. Heating Contractor. c. Air Conditioning and Ventilating Contractor. d. Temperature Control Contractor. e. Fire Protection Contractor. f. Testing, Adjusting, and Balancing Contractor. 2. Motor Control Wiring: The wiring associated with the remote operation of the magnetic coils of magnetic motor starters or relays, or the wiring that permits direct cycling of motors by means of devices in series with the motor power wiring. In the latter case the devices are usually single phase and are usually connected to the motor power wiring through a manual motor starter having "Manual-Off-Auto" provisions. 3. Control devices such as start-stop push buttons, thermostats, pressure switches, flow switches, relays, etc., generally represent the types of equipment associated with motor control wiring. 571 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 3 BASIC PLUMBING REQUIREMENTS 4. Motor control wiring is single phase and usually 120 volts. In some instances, the voltage will be the same as the motor power wiring. Generally, where the motor power wiring exceeds 120 volts, a control transformer is used to give a control voltage of 120 volts. 5. Temperature Control Wiring: The wiring associated with the operation of a motorized damper, solenoid valve or motorized valve, etc., either modulating or two-position, as opposed to wiring which directly powers or controls a motor used to drive equipment such as fans, pumps, etc. a. This wiring will be from a 120 volt source and may continue as 120 volt, or be reduced in voltage (24 volt) in which case a control transformer shall be furnished as part of the temperature control wiring. 6. Control Motor: An electric device used to operate dampers, valves, etc. It may be two-position or modulating. Conventional characteristics of such a motor are 24 volts, 60 cycles, 1 phase, although other voltages may be encountered. 7. Voltage is generally specified and scheduled as distribution voltage. Motor submittals may be based on utilization voltage if it corresponds to the correct distribution voltage. Distribution/Nominal Voltage Utilization Voltage 120 115 208 200 240 230 277 265 480 460 B. General: 1. The purpose of these Specifications is to outline the Electrical and Mechanical Contractor's responsibilities related to electrical work required for items such as temperature controls, mechanical equipment, fans, chillers, compressors and the like. The exact wiring requirements for much of the equipment cannot be determined until the systems have been selected and submittals reviewed. Therefore, the electrical drawings show only known wiring related to such items. All wiring not shown on the electrical drawings, but required for mechanical systems, is the responsibility of the Mechanical Contractor. 2. Where the drawings require the Electrical Contractor to wire between equipment furnished by the Mechanical Contractor, such wiring shall terminate at terminals provided in the equipment. The Mechanical Contractor shall provide complete electrical power/controls wiring diagrams and supervision to the Electrical Contractor and designate the terminal numbers for correct wiring. 3. All electrical work shall conform to the National Electrical Code. All provisions of the Electrical Specifications concerning wiring, protection, etc., apply to wiring provided by the Mechanical Contractor unless noted otherwise. 572 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 4 BASIC PLUMBING REQUIREMENTS 4. Control low (24V) and control line (120V) voltage wiring, conduit, and related switches and relays required for the automatic control and/or interlock of motors and equipment, including final connection, are to be furnished and installed under Divisions 21, 22 and 23. Materials and installation to conform to Class 1 or 2 requirements, California Electrical Code Article 725. 5. All Contractors shall establish utility elevations prior to fabrication and shall coordinate their material and equipment with other trades. When a conflict arises, priority is as follows: a. Light fixtures. b. Gravity flow piping, including steam and condensate. c. Electrical busduct. d. Sheet metal. e. Electrical cable trays, including access space. f. Sprinkler piping and other piping. g. Electrical conduits and wireway. C. Mechanical Contractor's Responsibility: 1. Assumes responsibility for internal wiring of all equipment provided by the Mechanical Contractor, for example: a. Condensing Units. b. Packaged Rooftop Units. 2. Assumes all responsibility for the Temperature Control wiring, when the Temperature Control Contractor is a Subcontractor to the Mechanical Contractor. 3. Shall verify all existing equipment sizes and capacities where units are to be modified, moved or replaced. Contractor shall notify Architect/Engineer of any discrepancies prior to ordering new units or replacement parts, including replacements of equipment motors. 4. Temperature Control Subcontractor's Responsibility: a. Wiring of all devices needed to make the Temperature Control System functional. b. Verifying any control wiring on the electrical drawings as being by the Electrical Contractor. All wiring required for the Control System, but not shown on the electrical drawings, is the responsibility of the Temperature Control Subcontractor. c. Coordinating equipment locations (such as relays, transformers, etc.) with the Electrical Contractor, where wiring of the equipment is by the Electrical Contractor. 5. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. --- 573 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 5 BASIC PLUMBING REQUIREMENTS 1.5 COORDINATION DRAWINGS A. Definitions: 1. Coordination Drawings: A compilation of the pertinent layout and system drawings that show the sizes and locations, including elevations, of system components and required access areas to ensure that no two objects will occupy the same space. a. Mechanical trades shall include, but are not limited to, mechanical equipment, ductwork, fire protection systems, plumbing piping,, hydronic piping, steam and steam condensate piping, and any item that may impact coordination with other disciplines. b. Technology trades shall include, but are not limited to, technology equipment, racks, conduit 1.5" and larger, conduit racks, cable trays, ladder rack, pull boxes, raceway, ceiling-mounted devices, and any item that may impact coordination with other disciplines. c. Maintenance clearances and code-required dedicated space shall be included. d. The coordination drawings shall include all underground, underfloor, in- floor, in chase, and vertical trade items. 2. The contractors shall use the coordination process to identify the proper sequence of installation of all utilities above ceilings and in other congested areas, to ensure an orderly and coordinated end result, and to provide adequate access for service and maintenance. B. Participation: 1. The contractors and subcontractors responsible for work defined above shall participate in the coordination drawing process. 2. One contractor shall be designated as the Coordinating Contractor for purposes of preparing a complete set of composite electronic CAD coordination drawings that include all applicable trades, and for coordinating the activities related to this process. The Coordinating Contractor for this project shall be the Mechanical Contractor. a. The Coordinating Contractor shall utilize personnel familiar with requirements of this project and skilled as draftspersons/CAD operators, competent to prepare the required coordination drawings. 3. Electronic CAD drawings shall be submitted to the Coordinating Contractor and owner for addition of work by other trades. IMEG will provide electronic file copies of ventilation drawings for contractor's use if the contractor signs and returns an "Electronic File Transfer" waiver provided by IMEG. IMEG will not consider blatant reproductions of original file copies an acceptable alternative for coordination drawings. Owner to recieve copy of CAD files. 574 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 6 BASIC PLUMBING REQUIREMENTS C. Drawing Requirements: 1. The file format and file naming convention shall be coordinated with and agreed to by all contractors participating in the coordination process and the Owner. For construction, plans shall be provided by IMEG prior to bid. Coordination between trades shall occur prior to bid. a. |Scale of drawings: 1) |General plans: 1/4 Inch = 1 '-0" (minimum). 2) Mechanical, electrical, communication rooms, and including the surrounding areas within 10 feet: 1/2 Inch = 1'-0" (minimum). 3) Shafts and risers: 1/2 Inch = 1'-0" (minimum). 4) Sections of shafts and mechanical and electrical equipment rooms: 1/4 Inch = 1 '-0" (minimum). 5) Sections of congested areas: 1/2 Inch = 1'-0" (minimum). 2. Ductwork layout drawings shall be the baseline system for other components. Ductwork layout drawings shall be modified to accommodate other components as the coordination process progresses. 3. There may be more drawings required for risers, top and bottom levels of mechanical rooms, and shafts. 4. The minimum quantity of drawings will be established at the first coordination meeting and sent to the A/E for review. Additional drawings may be required if other areas of congestion are discovered during the coordination process. D. General: 1. Coordination drawing files shall be made available to the A/E and Owner's Representative. The A/E will only review identified conflicts and give an opinion, but will not perform as a coordinator. 2. A plotted set of coordination drawings shall be available at the project site. 3. Coordination drawings are not shop drawings and shall not be submitted as such. 4. The contract drawings are schematic in nature and do not show every fitting and appurtenance for each utility. Each contractor is expected to have included in the bid sufficient fittings, material, and labor to allow for adjustments in routing of utilities made necessary by the coordination process and to provide a complete and functional system. 5. The contractors will not be allowed additional costs or time extensions due to participation in the coordination process. 6. The contractors will not be allowed additional costs or time extensions for additional fittings, reroutings or changes of duct size, that are essentially equivalent sizes to those shown on the drawings and determined necessary through the coordination process. 7. The A/E reserves the right to determine space priority of equipment in the event of spatial conflicts or interference between equipment, piping, conduit, ducts, and equipment provided by the trades. 8. Changes to the contract documents that are necessary for systems installation and coordination shall be brought to the attention of the A/E. 575 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 7 BASIC PLUMBING REQUIREMENTS 9. Access panels shall preferably occur only in gypsum board walls or plaster ceilings where indicated on the drawings. a. Access to mechanical, electrical, technology, and other items located above the ceiling shall be through accessible lay-in ceiling tile areas. b. Potential layout changes shall be made to avoid additional access panels. c. Additional access panels shall not be allowed without written approval from the A/E at the coordination drawing stage. d. Providing additional access panels shall be considered after other alternatives are reviewed and discarded by the A/E and the Owner's Representative. e. When additional access panels are required, they shall be provided without additional cost to the Owner. 10. Complete the coordination drawing process and obtain sign off of the drawings by all contractors prior to installing any of the components. 11. Conflicts that result after the coordination drawings are signed off shall be the responsibility of the contractor or subcontractor who did not properly identify their work requirements, or installed their work without proper coordination. 12. Updated coordination drawings that reflect as-built conditions may be used as record documents. 1.6 QUALITY ASSURANCE A. Contractor's Responsibility Prior to Submitting Pricing Data: 1. The Contractor is responsible for constructing complete and operating systems. The Contractor acknowledges and understands that the Contract Documents are a two-dimensional representation of a three-dimensional object, subject to human interpretation. This representation may include imperfect data, interpreted codes, utility guidelines, three-dimensional conflicts, and required field coordination items. Such deficiencies can be corrected when identified prior to ordering material and starting installation. The Contractor agrees to carefully study and compare the individual Contract Documents and report at once in writing to the Design Team any deficiencies the Contractor may discover. The Contractor further agrees to require each subcontractor to likewise study the documents and report at once any deficiencies discovered. 2. The Contractor shall resolve all reported deficiencies with the Architect/Engineer prior to awarding any subcontracts, ordering material, or starting any work with the Contractor's own employees. Any work performed prior to receipt of instructions from the Design Team will be done at the Contractor's risk. B. Qualifications: 1. Only products of reputable manufacturers are acceptable. 2. All Contractors and subcontractors shall employ only workers skilled in their trades. 576 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 8 BASIC PLUMBING REQUIREMENTS C. Compliance with Codes, Laws, Ordinances: 1. Conform to all requirements of the City of Moorpark Codes, Laws, Ordinances and other regulations having jurisdiction. 2. Conform to all State Codes. 3. Conform to Federal Act S.3874 requiring the reduction of lead in drinking water. 4. If there is a discrepancy between the codes and regulations and these specifications, the Architect/Engineer shall determine the method or equipment used. 5. If the Contractor notes, at the time of bidding, that any parts of the drawings or specifications do not comply with the codes or regulations, Contractor shall inform the Architect/Engineer in writing, requesting a clarification. If there is insufficient time for this procedure, Contractor shall submit with the proposal a separate price to make the system comply with the codes and regulations. 6. All changes to the system made after letting of the contract, to comply with codes or requirements of Inspectors, shall be made by the Contractor without cost to the Owner. 7. If there is a discrepancy between manufacturer's recommendations and these specifications, the manufacturer's recommendations shall govern. D. Permits, Fees, Taxes, Inspections: 1. Procure all applicable permits and licenses. 2. Abide by all laws, regulations, ordinances, and other rules of the State or Political Subdivision where the work is done, or as required by any duly constituted public authority. 3. Pay all charges for permits or licenses. 4. Pay all fees and taxes imposed by the State, Municipal and/or other regulatory bodies. 5. Pay all charges arising out of required inspections by an authorized body ass applicable. 6. Pay all charges arising out of required contract document reviews associated with the project and as initiated by the Owner or authorized agency/consultant as applicable. 7. Where applicable, all fixtures, equipment and materials shall be listed by Underwriters' Laboratories, Inc. and approved by FM Global. E. Examination of Drawings: 1. The drawings for the plumbing work are completely diagrammatic, intended to convey the scope of the work and to indicate the general arrangements and locations of equipment, outlets, etc., and the approximate sizes of equipment. 2. Contractor shall determine the exact locations of equipment and rough-ins, and the exact routing of pipes and ducts to best fit the layout of the job. 3. Scaling of the drawings is not sufficient or accurate for determining these locations. 4. Where job conditions require reasonable changes in indicated arrangements and locations, such changes shall be made by the Contractor at no additional cost to the Owner. 577 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 9 BASIC PLUMBING REQUIREMENTS 5. Because of the scale of the drawings, certain basic items, such as fittings, boxes, valves, unions, etc., may not be shown, but where required by other sections of the specifications or required for proper installation of the work, such items shall be furnished and installed. 6. If an item is either on the drawings or in the specifications, it shall be included in this contract. 7. Determination of quantities of material and equipment required shall be made by the Contractor from the documents. Where discrepancies arise between drawings, schedules and/or specifications, the greater number shall govern. 8. Where used in mechanical documents, the word "furnish" shall mean supply for use, the word "install" shall mean connect complete and ready for operation, and the word "provide" shall mean to supply for use and connect complete and ready for operation. a. Any item listed as furnished shall also be installed, unless otherwise noted. b. Any item listed as installed shall also be furnished, unless otherwise noted. F. Field Measurements: 1. Verify all pertinent dimensions at the job site before ordering any materials or fabricating any supports, pipes or ducts. G. Electronic Media/Files: 1. Construction drawings for this project have been prepared utilizing Revit. 2. Contractors and Subcontractors may request electronic media files of the contract drawings and/or copies of the specifications. Specifications will be provided in PDF format. 3. Upon request for electronic media, the Contractor shall complete and return a signed "Electronic File Transmittal" form provided by IMEG. 4. If the information requested includes floor plans prepared by others, the Contractor will be responsible for obtaining approval from the appropriate Design Professional for use of that part of the document. 5. The electronic contract documents can be used for preparation of shop drawings and as-built drawings only. The information may not be used in whole or in part for any other project. 6. The drawings prepared by IMEG for bidding purposes may not be used directly for shop drawings. 7. The use of these CAD documents by the Contractor does not relieve them from their responsibility for coordination of work with other trades and verification of space available for the installation. 578 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 10 BASIC PLUMBING REQUIREMENTS 1.7 SUBMITTALS A. Submittals shall be required for the following items, and for additional items where required elsewhere in the specifications or on the drawings. 1. Submittals List: Referenced Specification Section Submittal Item 22 05 00 Owner Training Agenda 22 05 03 Fire Seal Systems 22 05 29 Hangers and Supports 22 05 53 Plumbing Identification 22 07 19 Plumbing Pipe Insulation 22 09 00 Instrumentation 22 10 00 Plumbing Piping Systems and Valves 22 40 00 Plumbing Fixtures B. General Submittal Procedures: In addition to the provisions of Division 1, the following are required: 1. Transmittal: Each transmittal shall include the following: a. Date b. Project title and number c. Contractor's name and address d. Division of work (e.g., plumbing, heating, ventilating, etc.) e. Description of items submitted and relevant specification number f. Notations of deviations from the contract documents g. Other pertinent data 2. Submittal Cover Sheet: Each submittal shall include a cover sheet containing: a. Date b. Project title and number c. Architect/Engineer d. Contractor and subcontractors' names and addresses e. Supplier and manufacturer's names and addresses f. Division of work (e.g., plumbing, heating, ventilating, etc.) g. Description of item submitted (using project nomenclature) and relevant specification number h. Notations of deviations from the contract documents i. Other pertinent data j. Provide space for Contractor's review stamps 3. Composition: a. Submittals shall be submitted using specification sections and the project nomenclature for each item. 579 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 11 BASIC PLUMBING REQUIREMENTS b. Individual submittal packages shall be prepared for items in each specification section. All items within a single specification section shall be packaged together where possible. An individual submittal may contain items from multiple specifications sections if the items are intimately linked (e.g., pumps and motors). c. All sets shall contain an index of the items enclosed with a general topic description on the cover. 4. Content: Submittals shall include all fabrication, erection, layout, and setting drawings; manufacturers' standard drawings; schedules; descriptive literature, catalogs and brochures; performance and test data; electrical power criteria (e.g., voltage, phase, amps, horsepower, kW, etc.) wiring and control diagrams; Short Circuit Current Rating (SCCR); dimensions; shipping and operating weights; shipping splits; service clearances; and all other drawings and descriptive data of materials of construction as may be required to show that the materials, equipment or systems and the location thereof conform to the requirements of the contract documents. 5. Contractor's Approval Stamp: a. The Contractor shall thoroughly review and approve all shop drawings before submitting them to the Architect/Engineer. The Contractor shall stamp, date and sign each submittal certifying it has been reviewed. b. Unstamped submittals will be rejected. c. The Contractor's review shall include, but not be limited to, verification of the following: 1) Only approved manufacturers are used. 2) Addenda items have been incorporated. 3) Catalog numbers and options match those specified. 4) Performance data matches that specified. 5) Electrical characteristics and loads match those specified. 6) Equipment connection locations, sizes, capacities, etc. have been coordinated with other affected trades. 7) Dimensions and service clearances are suitable for the intended location. 8) Equipment dimensions are coordinated with support steel, housekeeping pads, openings, etc. 9) Constructability issues are resolved (e.g., weights and dimensions are suitable for getting the item into the building and into place, sinks fit into countertops, etc.). d. The Contractor shall review, stamp and approve all subcontractors' submittals as described above. e. The Contractor's approval stamp is required on all submittals. Approval will indicate the Contractor's review of all material and a complete understanding of exactly what is to be furnished. Contractor shall clearly mark all deviations from the contract documents on all submittals. If deviations are not marked by the Contractor, then the item shall be required to meet all drawing and specification requirements. 580 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 12 BASIC PLUMBING REQUIREMENTS 6. Submittal Identification and Markings: a. The Contractor shall clearly mark each item with the same nomenclature applied on the drawings or in the specifications. b. The Contractor shall clearly indicate the size, finish, material, etc. c. Where more than one model is shown on a manufacturer's sheet, the Contractor shall clearly indicate exactly which item and which data is intended. d. All marks and identifications on the submittals shall be unambiguous. 7. Schedule submittals to expedite the project. Coordinate submission of related items. 8. Identify variations from the contract documents and product or system limitations that may be detrimental to the successful performance of the completed work. 9. Reproduction of contract documents alone is not acceptable for submittals. 10. Incomplete submittals will be rejected without review. Partial submittals will only be reviewed with prior approval from the Architect/Engineer. 11. Submittals not required by the contract documents may be returned without review. 12. The Architect/Engineer's responsibility shall be to review one set of shop drawing submittals for each product. If the first submittal is incomplete or does not comply with the drawings and/or specifications, the Contractor shall be responsible to bear the cost for the Architect/Engineer to recheck and handle the additional shop drawing submittals. 13. Submittals shall be reviewed and approved by the Architect/Engineer before releasing any equipment for manufacture or shipment. 14. Contractor's responsibility for errors, omissions or deviation from the contract documents in submittals is not relieved by the Architect/Engineer's approval. 15. Schedule shall allow for adequate time to perform orderly and proper review of submittals, including time for consultants and Owner if required, and resubmittals by Contractor if necessary, and to cause no delay in Work or in activities of Owner or other contractors. a. Allow at least two weeks for Architect's/Engineer's review and processing of each submittal. 16. Architect/Engineer reserves the right to withhold action on a submittal which, in the Architect/Engineer's opinion, requires coordination with other submittals until related submittals are received. The Architect/Engineer will notify the Contractor, in writing, when they exercise this right. C. Electronic Submittal Procedures: 1. Distribution: Email submittals as attachments to all parties designated by the Architect/Engineer, unless a web-based submittal program is used. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 581 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 13 BASIC PLUMBING REQUIREMENTS 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. Submittal file name: 22 XX XX.description.YYYYMMDD b. Transmittal file name: 22 XX XX.description.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 1.8 SCHEDULE OF VALUES A. The requirements herein are in addition to the provisions of Division 1. B. Format: 1. Use AIA Document Continuation Sheets G703 or another similar form approved by the Owner and Architect/Engineer. 2. Submit in Excel format. 3. Support values given with substantiating data. C. Preparation: 1. Itemize work required by each specification section and list all providers. All work provided by subcontractors and major suppliers shall be listed on the Schedule of Values. List each subcontractor and supplier by company name. 2. Break down all costs into: a. Material: Delivered cost of product with taxes paid. b. Labor: Labor cost, excluding overhead and profit. 3. Itemize the cost for each of the following: a. Overhead and profit. b. Bonds. c. Insurance. d. General Requirements: Itemize all requirements. 4. For each line item having an installed cost of more than $5,000, break down costs to list major products or operations under each item. At a minimum, provide material and labor cost line items for the following: a. Excavation and backfill for underground piping systems inside the building. b. Underground piping systems inside the building (sanitary, storm, etc.) listed separately. Break down the material and labor for each piping system based on geography (building, floor, wing and/or phase). c. Each aboveground piping system (sanitary, storm, domestic water, etc.). Break down the material and labor for each piping system based on geography (building, floor, wing and/or phase). 582 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 14 BASIC PLUMBING REQUIREMENTS d. Pipe insulation with separate material and labor line items for each piping system listed above. e. Each piece of equipment requiring shop drawings. f. Each plumbing fixture (e.g., WC, lavatory, sink, etc.). Multiple units of the same type can be listed together, provided quantities are also listed so unit costs can be determined. g. Site utilities (5' beyond building) h. Seismic design i. Water balancing j. Commissioning k. Record drawings l. Punchlist and closeout D. Update Schedule of Values when: 1. Indicated by Architect/Engineer. 2. Change of subcontractor or supplier occurs. 3. Change of product or equipment occurs. 1.9 CHANGE ORDERS A. A detailed material and labor takeoff shall be prepared for each change order, along with labor rates and markup percentages. Change orders shall be broken down by sheet or associated individual line item indicated in the change associated narrative, whichever provides the most detailed breakdown. Change orders with inadequate breakdown will be rejected. B. Itemized pricing with unit cost shall be provided from all distributors and associated subcontractors. C. Change order work shall not proceed until authorized. 1.10 EQUIPMENT SUPPLIERS' INSPECTION A. The following equipment shall not be placed in operation until a competent installation and service representative of the manufacturer has inspected the installation and certified that the equipment is properly installed, adjusted and lubricated; that preliminary operating instructions have been given; and that the equipment is ready for operation: 1. Fire Seal Systems 2. Seismic Restraints and Equipment Bracing B. Contractor shall arrange for and obtain supplier's on-site inspection(s) at proper time(s) to assure each phase of equipment installation and/or connection is in accordance with the manufacturer's instructions. C. Submit copies of start-up reports to the Architect/Engineer and include copies of Owner's Operation and Maintenance Manuals. 583 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 15 BASIC PLUMBING REQUIREMENTS 1.11 PRODUCT DELIVERY, STORAGE, HANDLING & MAINTENANCE A. Exercise care in transporting and handling to avoid damage to materials. Store materials on the site to prevent damage. Keep materials clean, dry and free from harmful conditions. Immediately remove any materials that become wet or that are suspected of becoming contaminated with mold or other organisms. B. Keep all bearings properly lubricated and all belts properly tensioned and aligned. C. Coordinate the installation of heavy and large equipment with the General Contractor and/or Owner. If the Mechanical Contractor does not have prior documented experience in rigging and lifting similar equipment, he/she shall contract with a qualified lifting and rigging service that has similar documented experience. Follow all equipment lifting and support guidelines for handling and moving. D. Contractor is responsible for moving equipment into the building and/or site. Contractor shall review site prior to bid for path locations and any required building modifications to allow movement of equipment. Contractor shall coordinate the work with other trades. 1.12 WARRANTY A. Provide one-year warranty, unless otherwise noted, to the Owner for all fixtures, equipment, materials, and workmanship. B. The warranty period for all work in this Division of the specifications shall commence on the date of notice of completion, unless a whole or partial system or any separate piece of equipment or component is put into use for the benefit of any party other than the installing contractor with prior written authorization. In this instance, the warranty period shall commence on the date when such whole system, partial system or separate piece of equipment or component is placed in operation and accepted in writing by the Owner. C. Warranty requirements shall extend to correction, without cost to the Owner, of all Work found to be defective or nonconforming to the contract documents. The Contractor shall bear the cost of correcting all damage resulting from defects or nonconformance with contract documents. 1.13 INSURANCE A. Contractor shall maintain insurance coverage as set forth in Division 0 of these specifications. 1.14 MATERIAL SUBSTITUTION A. Where several manufacturers’ names are given, the first manufacturer is the basis for job design and establishes the quality. 584 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 16 BASIC PLUMBING REQUIREMENTS B. Equivalent equipment manufactured by the other listed manufacturers may be used. Contractor shall ensure that all items submitted by these other manufacturers meet all requirements of the drawings and specifications and fits in the allocated space. When using other listed manufacturers, the Contractor shall assume responsibility for any and all modifications necessary (including, but not limited to structural supports, electrical connections, piping and ductwork connections and arrangement, plumbing connections and rough-in, and regulatory agency approval, etc.) and coordinate such with other contractors. C. Any material, article or equipment of other unnamed manufacturers which will adequately perform the services and duties imposed by the design and is of a quality equal to or better than the material, article or equipment identified by the drawings and specifications may be used if approval is secured in writing from the Architect/Engineer not later than ten days prior to the bid opening. D. This Contractor assumes all costs incurred as a result of using the offered material, article or equipment, on the Contractor's part or on the part of other Contractors whose work is affected. E. This Contractor may list voluntary add or deduct prices for alternate materials on the bid form. These items will not be used in determining the low bidder. F. All material substitutions requested later than ten (10) days prior to bid opening must be listed as voluntary changes on the bid form. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 JOBSITE SAFETY A. Neither the professional activities of the Architect/Engineer, nor the presence of the Architect/Engineer or the employees and subconsultants at a construction site, shall relieve the Contractor and other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions of the work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Architect/Engineer and personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The Contractor is solely responsible for jobsite safety. The Architect/Engineer and the Architect/Engineer's consultants shall be indemnified and shall be made additional insureds under the Contractor's general liability insurance policy. 585 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 17 BASIC PLUMBING REQUIREMENTS 3.2 EXCAVATION, FILL, BACKFILL, COMPACTION A. General: 1. Prior to the commencement of any excavation or digging, the Contractor shall verify all underground utilities with the regional utility locator. Provide prior notice to the locator before excavations. Contact information for most regional utility locaters can be found at the following website (https://call811.com/) or by calling 811. 2. The Contractor shall do all excavating, filling, backfilling and compacting associated with the work. B. Excavation: 1. Make all excavations to accurate, solid, undisturbed earth, and to proper dimensions. 2. Where excavations are made in error below foundations, concrete of same strength as specified for the foundations or thoroughly compacted sand-gravel fill, as determined by the Architect/Engineer, shall be placed in such excess excavations. Place thoroughly compacted, clean, stable fill in excess excavations under slabs on grade, at the Contractor's expense. 3. Trim bottom and sides of excavations to grades required for foundations. 4. Protect excavations against frost and freezing. 5. Take care in excavating not to damage surrounding structures, equipment, or buried pipe. Do not undermine footing or foundation. 6. Perform all trenching in a manner to prevent cave-ins and risk to workers. 7. Where original surface is pavement or concrete, the surface shall be saw cut to provide clean edges and assist in the surface restoration. 8. Where satisfactory bearing soil for foundations is not found at the indicated levels, the Architect/Engineer or their representative shall be notified immediately, and no further work shall be done until further instructions are given by the Architect/Engineer or their representative. C. Underground Obstructions: 1. Known underground piping, foundations, and other obstructions in the vicinity of construction are shown on the drawings. Use great care in making installations near underground obstruction. 2. If objects not shown on the drawings are encountered, remove, relocate, or perform extra work as directed by the Architect/Engineer. D. Fill and Backfilling: 1. Utilities Bedding: Lay underground utilities on minimum of 6" sand bedding or. Compact bedding under utilities smooth, with no sharp edges protruding, to protect the utilities from puncture. Shape bedding to provide continuous support for bells, joints, and barrels of utilities and for joints and fittings. 586 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 18 BASIC PLUMBING REQUIREMENTS 2. Envelope around utilities to 6" above utilities: Place and compact sand or to a height of 6" over utilities in 6" layers. Each layer shall be placed, then carefully and uniformly tamped, to eliminate lateral or vertical displacement. After connection joints are made, any misalignment can be corrected by tamping backfill around the utilities. 3. Backfill from 6" above utilities to earthen grade: Place all backfill materials above the utilities in uniform layers not exceeding 6" deep. Each layer shall be placed, then carefully and uniformly tamped, to eliminate lateral or vertical displacement. 4. Backfill from 6" above utilities to below slabs or paved area: Where the fill and backfill will ultimately be under a building, floor or paving, each layer of backfill materials shall be compacted to 95% of the maximum density determined by AASHTO Designation T 99 or ASTM Designation D 698. Moisture content of soil at time of compaction shall not exceed plus or minus 2% of optimum moisture content determined by AASHTO T 99 or ASTM D 698 test. 5. Backfill Materials: Native soil materials may be used as backfill if approved by the Geotechnical Engineer. Backfill material shall be free of rock or gravel larger than 3" in any dimension and shall be free of debris, waste, frozen materials, vegetation, high void content, and other deleterious materials. Water shall not be permitted to rise in unbackfilled trenches. 6. Dispose of excess excavated earth as directed. 7. Backfill all trenches and excavations immediately after installing utilities or removal of forms, unless other protection is provided. 8. Around piers and isolated foundations and structures, backfill and fill shall be placed and consolidated simultaneously on all sides to prevent wedge action and displacement. Fill and backfill materials shall be spread in 6 inch uniform horizontal layers with each layer compacted separately to required density. E. Surface Restoration: 1. Where trenches are cut through existing graded, planted, or landscaped areas, the areas shall be restored to the original condition. Replace all planting removed or damaged to its original condition. A minimum of 6 inches of topsoil shall be applied where disturbed areas are to be seeded or sodded. 2. Concrete or asphalt type pavement, seal coat, rock, gravel or earth surfaces removed or damaged shall be replaced with comparable materials and restored to original condition. 3.3 ARCHITECT/ENGINEER OBSERVATION OF WORK A. The Contractor shall provide seven (7) calendar days' notice to the Architect/Engineer prior to: 1. Placing fill over underground and underslab utilities. 2. Covering exterior walls, interior partitions and chases. 3. Installing hard or suspended ceilings and soffits. B. The Architect/Engineer will have the opportunity to review the installation and provide a written report noting deficiencies requiring correction. The Contractor's schedule shall account for these reviews and show them as line items in the approved schedule. 587 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 19 BASIC PLUMBING REQUIREMENTS C. Above-Ceiling Final Observation 1. All work above the ceilings must be complete prior to the Architect/Engineer's review. This includes, but is not limited to: a. Pipe insulation is installed and fully sealed. b. Pipe wall penetrations are sealed. c. Pipe identification and valve tags are installed. 2. In order to prevent the Above-Ceiling Final Observation from occurring too early, the Contractor shall review the status of the work and certify, in writing, that the work is ready for the Above-Ceiling Final Observation. 3. It is understood that if the Architect/Engineer finds the ceilings have been installed prior to this review and prior to 7 days elapsing, the Architect/Engineer may not recommend further payments to the contractor until such time as full access has been provided. 3.4 PROJECT CLOSEOUT A. The following paragraphs supplement the requirements of Division 1. B. Final Jobsite Observation: 1. In order to prevent the Final Jobsite Observation from occurring too early, the Contractor is required to review the completion status of the project and certify that the job is ready for the final jobsite observation. 2. Attached to the end of this section is a typical list of items that represent the degree of job completeness expected prior to requesting a review. 3. Upon Contractor certification that the project is complete and ready for a final observation, the Contractor shall sign the attached certification and return it to the Architect/Engineer so that the final observation can be scheduled. 4. It is understood that if the Architect/Engineer finds the job not ready for the final observation and that additional trips and observations are required to bring the project to completion, the costs incurred by the Architect/Engineer's additional time and expenses will be deducted from the Contractor's contract retainage prior to final payment at the completion of the job. C. Before final payment is authorized, this Contractor must submit the following: 1. Operation and maintenance marked-up manuals with copies of approved shop drawings. 2. Record documents including marked-up drawings and specifications. 3. A report documenting the instructions given to the Owner's representatives complete with the number of hours spent in the instruction. The report shall bear the signature of an authorized agent of This Contractor and shall be signed by the Owner's representatives. 4. Start-up reports on all equipment requiring a factory installation inspection or start-up. 5. Provide spare parts, maintenance, and extra materials in quantities specified in individual specification sections. Deliver to project site; receipt by Architect/Engineer required prior to final payment approval. 588 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 20 BASIC PLUMBING REQUIREMENTS 3.5 OPERATION AND MAINTENANCE MANUALS A. General: 1. Provide an electronic copy of the O&M manuals as described below for Architect/Engineer's review and approval. The electronic copy shall be corrected as required to address the Architect/Engineer's comments. Once corrected, electronic copies and paper copies shall be distributed as directed by the Architect/Engineer. 2. Approved O&M manuals shall be completed and in the Owner's possession prior to Owner's acceptance and at least 10 days prior to instruction of operating personnel. B. Electronic Submittal Procedures: 1. Distribution: Email the O&M manual as attachments to all parties designated by the Architect/Engineer. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. O&M file name: O&M.div22.contractor.YYYYMMDD b. Transmittal file name: O&Mtransmittal.div22.contractor.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 6. Provide the Owner with an approved copy of the O&M manual on compact discs (CD), digital video discs (DVD), or flash drives with a permanently affixed label, printed with the title "Operation and Maintenance Instructions", title of the project and subject matter of disc/flash drive when multiple disc/flash drives are required. 7. All text shall be searchable. 8. Bookmarks shall be used, dividing information first by specification section, then systems, major equipment and finally individual items. All bookmark titles shall include the nomenclature used in the construction documents and shall be an active link to the first page of the section being referenced. C. Operation and Maintenance Instructions shall include: 1. Title Page: Include title page with project title, Architect, Engineer, Contractor, all subcontractors, and major equipment suppliers, with addresses, telephone numbers, website addresses, email addresses and point of contacts. Website URLs and email addresses shall be active links in the electronic submittal. 2. Table of Contents: Include a table of contents describing specification section, systems, major equipment, and individual items. 589 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 21 BASIC PLUMBING REQUIREMENTS 3. Copies of all final approved shop drawings and submittals. Include Architect's/Engineer's shop drawing review comments. Insert the individual shop drawing directly after the Operation and Maintenance information for the item(s) in the review form. 4. Copy of final approved test and balance reports. 5. Copies of all factory inspections and/or equipment startup reports. 6. Copies of warranties. 7. Schematic electrical power/controls wiring diagrams of the equipment that have been updated for field conditions. Field wiring shall have label numbers to match drawings. 8. Dimensional drawings of equipment. 9. Capacities and utility consumption of equipment. 10. Detailed parts lists with lists of suppliers. 11. Operating procedures for each system. 12. Maintenance schedule and procedures. Include a chart listing maintenance requirements and frequency. 13. Repair procedures for major components. 14. List of lubricants in all equipment and recommended frequency of lubrication. 15. Instruction books, cards, and manuals furnished with the equipment. 16. Owner and Contractor attendance list for domestic water systems operation, maintenance, and flushing training. 3.6 INSTRUCTING THE OWNER'S REPRESENTATIVES A. Adequately instruct the Owner's designated representatives in the maintenance, care, and operation of all systems installed under this contract. B. Provide verbal and written instructions to the Owner's representatives by FACTORY PERSONNEL in the care, maintenance, and operation of the equipment and systems. C. Contractor shall make a DVD video recording of instructions to the Owner while explaining the system so additional personnel may view the instructions at a later date. The video recording shall be the property of the Owner. D. The Owner has the option to make a video recording of all instructions. Coordinate schedule of instructions to facilitate this recording. E. The instructions shall include: 1. Explanation of all system flow diagrams. 2. Maintenance of equipment. 3. Start-up procedures for all major equipment. 4. Explanation of seasonal system changes. 5. Explanation of Owner’s Responsibilities to operate, maintain, and flush domestic water system (i.e., ASHRAE Standard 188). F. Notify the Architect/Engineer of the time and place for the verbal instructions to be given to the Owner's representative so a representative can attend if desired. 590 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 22 BASIC PLUMBING REQUIREMENTS G. Minimum hours of instruction for each item shall be: 1. Domestic Hot Water System - 2 hours 2. All Domestic Water Systems operation, maintenance and flushing of all fixtures and dead legs - 2 hours H. The Contractor shall prepare a detailed, written training agenda and submit it to the Architect/Engineer a minimum of two weeks prior to the formal training for approval. The written agenda shall include specific training points within the items described above. For example: how to adjust setpoints, troubleshooting, proper start-up, proper shut-down, seasonal changes, draining, venting, changing filters, changing belts, etc. Failure to provide and follow an approved training agenda may result in additional training required at the expense of the Contractor. I. Operating Instructions: 1. Contractor is responsible for all instructions to the Owner's representatives for the mechanical and control systems. 2. If the Contractor does not have staff that can adequately provide the required instructions the Contractor shall include in the bid an adequate amount to reimburse the Owner for the Architect/Engineer to perform these services. 3.7 SYSTEM STARTING AND ADJUSTING A. The plumbing systems shall be complete and operating. System startup, testing, adjusting, and balancing to obtain satisfactory system performance is the responsibility of the Contractor. This includes calibration and adjustments of all controls, noise level adjustments and final adjustments as required. B. Complete all manufacturer-recommended startup procedures and checklists to verify proper motor rotation, electrical power voltage is within equipment limitations, equipment controls maintain pressures and temperatures within acceptable ranges, all filters and protective guards are in-place, acceptable access is provided for maintenance and servicing, and equipment operation does not pose a danger to personnel or property. C. Contractor shall adjust the plumbing systems and controls at season changes during the one year warranty period, as required, to provide satisfactory operation and to prove performance of all systems in all seasons. D. All operating conditions and control sequences shall be tested during the start-up period. Test all interlocks, safety shutdowns, controls, and alarms. 591 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 23 BASIC PLUMBING REQUIREMENTS E. The Contractor, subcontractors, and equipment suppliers shall have skilled technicians to ensure that all systems perform properly. If the Architect/Engineer is requested to visit the job site for trouble shooting, assisting in start-up, obtaining satisfactory equipment operation, resolving installation and/or workmanship problems, equipment substitution issues or unsatisfactory system performance, including call backs during the warranty period, through no fault of the design; the Contractor shall reimburse the Owner on a time and materials basis for services rendered at the Architect/Engineer's standard hourly rates in effect when the services are requested. The Contractor shall pay the Owner for services required that are product, installation or workmanship related. Payment is due within 30 days after services are rendered. 3.8 RECORD DOCUMENTS A. The following paragraphs supplement Division 1 requirements. B. Maintain at the job site a separate and complete set of plumbing drawings and specifications with all changes made to the systems clearly and permanently marked in complete detail. C. Mark drawings to indicate revisions to piping size and location, both exterior and interior; including locations devices, requiring periodic maintenance or repair; actual equipment locations, dimensioned from column lines; actual inverts and locations of underground piping; concealed equipment, dimensioned from column lines; mains and branches of piping systems, with valves and control devices located and numbered, concealed unions located, and with items requiring maintenance located; Change Orders; concealed control system devices. D. Before completion of the project, a set of reproducible plumbing drawings will be given to the Contractor for transfer of all as-built conditions from the paper set maintained at the job site. All marks on reproducibles shall be clear and permanent. E. Mark specifications to show approved substitutions; Change Orders, and actual equipment and materials used. F. Record changes daily and keep the marked drawings available for the Architect/Engineer's examination at any normal work time. G. Upon completing the job, and before final payment is made, give the marked-up drawings to the Architect/Engineer. 3.9 PAINTING A. Paint all equipment that is marred or damaged prior to the Owner's acceptance. Paint and color shall match original equipment paint and shall be obtained from the equipment supplier if available. B. Equipment in finished areas that will be painted to match the room decor will be painted by others. Should this Contractor install equipment in a finished area after the area has been painted, the Contractor shall have the equipment and all its supports, hangers, etc., painted to match the room decor. 592 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 24 BASIC PLUMBING REQUIREMENTS C. Equipment cabinets, casings, covers, metal jackets, etc., in equipment rooms or concealed spaces, shall be furnished in standard or prime finish, free from scratches, abrasions, chips, etc. D. Equipment in occupied spaces, or if standard to the unit, shall have a baked primer with baked enamel finish coat free from scratches, abrasions, chips, etc. If color option is specified or is standard to the unit, this Contractor shall, before ordering, verify with the Architect/Engineer the color preference and furnish this color. E. Paint all equipment in unfinished areas such as boiler room, mechanical spaces, storage room, etc., furnished by this Contractor. Equipment furnished with a factory coat of paint and enamel need not be painted, provided the factory applied finish is not marred or spattered. If so, equipment shall be refinished with the same paint as was factory applied. F. Paint all outdoor uninsulated steel piping the color selected by Owner or Architect/Engineer. G. After surfaces have been thoroughly cleaned and are free of oil, dirt, and other foreign matter; paint all pipes and equipment with the following: 1. Bare Metal Surfaces - Apply one coat of primer suitable for the metal being painted. Finish with two coats of Alkyd base enamel paint. 2. Insulated Surfaces - Paint insulation jackets with two coats of semi-gloss acrylic latex paint. 3. Color of paint shall be as follows: a. All piping in mechanical room: 1) Domestic Cold Water: Blue pipe/white letters 2) Domestic Hot Water: Red pipe/white letters 3) Sanitary Waste: Green pipe/black letters 3.10 ADJUST AND CLEAN A. Thoroughly clean all equipment and systems prior to the Owner's final acceptance of the project. Clean all foreign paint, grease, oil, dirt, labels, stickers, and other foreign material from all equipment. B. Clean all areas where moisture is present. Immediately report any mold, biological growth, or water damage. C. Remove all rust, scale, dirt, oils, stickers and thoroughly clean exterior of all exposed piping, hangers, and accessories. D. Remove all rubbish, debris, etc., accumulated during construction from the premises. 3.11 SPECIAL REQUIREMENTS A. Contractor shall coordinate the installation of all equipment, valves, dampers, operators, etc., with other trades to maintain clear access area for servicing. 593 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 25 BASIC PLUMBING REQUIREMENTS B. All equipment shall be installed in such a way to maximize access to parts needing service or maintenance. Review the final field location, placement, and orientation of equipment with the Owner's designated representative prior to setting equipment. C. Installation of equipment or devices without regard to coordination of access requirements and confirmation with the Owner's designated representative will result in removal and reinstallation of the equipment at the Contractor's expense. D. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 594 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 00 - 26 BASIC PLUMBING REQUIREMENTS READINESS CERTIFICATION PRIOR TO FINAL JOBSITE OBSERVATION To prevent the final job observation from occurring too early, we require that the Contractor review the completion status of the project and, by copy of this document, certify that the job is indeed ready for the final job observation. The following is a typical list of items that represent the degree of job completeness expected prior to your requesting a final job observation. 1. Penetrations fire sealed and labeled in accordance with specifications. 2. All pumps operating and balanced. 3. All plumbing fixtures installed and caulked. 4. Pipe insulation complete, pipes labeled and valves tagged. 5. Owner and Contractor attendance list for domestic water systems operation, maintenance, and flushing training. Accepted by: Prime Contractor _______________________________________________ By ___________________________________ Date ___________________ Upon Contractor certification that the project is complete and ready for a final job observation, we require the Contractor to sign this agreement and return it to the Architect/Engineer so that the final observation can be scheduled. It is understood that if the Architect/Engineer finds the job not ready for the final observation and that additional trips and observations are required to bring the project to completion, the costs incurred by the Architect/Engineers for additional time and expenses will be deducted from the Contractor's contract retainage prior to final payment at the completion of the job. END OF SECTION 22 05 00 595 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 03 - 1 THROUGH PENETRATION FIRESTOPPING SECTION 22 05 03 THROUGH PENETRATION FIRESTOPPING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Through-Penetration Firestopping. 1.2 QUALITY ASSURANCE A. Manufacturer: Company specializing in manufacturing products specified in this Section. B. Installer: Individuals performing work shall be certified by the manufacturer of the system selected for installation. 1.3 REFERENCES A. UL 263 - Fire Tests of Building Construction and Materials B. UL 723 - Surface Burning Characteristics of Building Materials C. ANSI/UL 1479 - Fire Tests of Through Penetration Firestops D. UL 2079 - Tests for Fire Resistance of Building Joint Systems E. UL Fire Resistance Directory Through Penetration Firestop Systems (XHEZ) F. Intertek / Warnock Hersey - Directory of Listed Products G. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials H. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops I. The Building Officials and Code Administrators National Building Code J. 2019 Uniform Building Code K. 2018 International Building Code L. NFPA 5000 - Building Construction Safety Code M. CBC California Building Code 596 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 03 - 2 THROUGH PENETRATION FIRESTOPPING 1.4 SUBMITTALS A. Submit under provisions of Section 22 05 00. B. Submit Firestopping Installers Certification for all installers on the project. C. Through-Penetration Firestop System Schedule: Indicate locations of each through- penetration firestop system, along with the following information: 1. Types of penetrating items. 2. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated. 3. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency. 4. F ratings for each firestop system. D. Maintain a notebook on the job site at all times that contains copies of approved submittals for all through penetration firestopping to be installed. Notebook shall be made available to the Authority Having Jurisdiction at their request and turned over to the Owner at the end of construction as part of the O&M Manuals. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store, protect and handle products on site. Accept material on site in factory containers and packing. Inspect for damage. Protect from deterioration or damage due to moisture, temperature changes, contaminants, or other causes. Follow manufacturer's instructions for storage. B. Install material prior to expiration of product shelf life. 1.6 PERFORMANCE REQUIREMENTS A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. B. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per UL 1479: 1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated. C. For through-penetration firestop systems exposed to light, traffic, moisture, or physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. 597 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 03 - 3 THROUGH PENETRATION FIRESTOPPING D. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84. E. For through-penetration firestop systems in air plenums, provide products with flame- spread and smoke-developed indexes of less than 25 and 50, respectively, as determined per ASTM E 84. F. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 1.7 MEETINGS A. Pre-installation meeting: A pre-installation meeting shall be scheduled and shall include the General Contractor, all Subcontractors associated with the installation of systems penetrating fire barriers, Firestopping Manufacturer's Representative, and the Owner. 1. Review foreseeable methods related to firestopping work. 2. Tour representative areas where firestopping is to be installed; inspect and discuss each type of condition and each type of substrate that will be encountered, and preparation to be performed by other trades. 1.8 WARRANTY A. Provide one year warranty on parts and labor. B. Warranty shall cover repair or replacement of firestop systems which fail in joint adhesion, cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, general durability, or appear to deteriorate in any manner not clearly specified by the manufacturer as an inherent quality of the material. 598 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 03 - 4 THROUGH PENETRATION FIRESTOPPING PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Products: Subject to compliance with requirements, provide one of the through- penetration firestop systems indicated for each application that are produced by one of the following manufacturers. All firestopping systems installed shall be provided by a single manufacturer. 1. 3M; Fire Protection Products Division. 2. Hilti, Inc. 3. Johns-Manville. 4. Dow Corning Corp. 2.2 THROUGH PENETRATION FIRESTOP SYSTEMS A. Provide materials and systems classified by or listed by Intertek / Warnock Hersey to provide firestopping equal to time rating of construction being penetrated. B. All firestopping materials shall be free of asbestos, lead, PCB's, and other materials that would require hazardous waste removal. C. Firestopping shall be flexible to allow for normal penetrating item movement due to expansion and contraction. D. Firestopping systems for plumbing and wet pipe sprinkler piping shall be moisture resistant. E. Provide firestopping systems capable of supporting floor loads where systems are exposed to possible floor loading or traffic. F. Provide firestopping systems allowing continuous insulation for all insulated pipes. G. Provide firestopping systems classified by UL or listed by Intertek / Warnock Hersey for penetrations through all fire rated construction. Firestopping systems shall be selected from the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory Category XHEZ based on substrate construction and penetrating item size and material and shall fall within the range of numbers listed: 1. Combustible Framed Floors and Chase Walls - 1 or 2 Hour Rated: a. F Rating = Floor/Wall Rating Penetrating Item UL System No. No Penetrating Item FC 0000-0999* Metallic Pipe or Conduit FC 1000-1999 Non-Metallic Pipe or Conduit FC 2000-2999 Electrical Cables FC 3000-3999 Cable Trays FC 4000-4999 Insulated Pipes FC 5000-5999 Bus Duct and Misc. Electrical FC 6000-6999 599 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 03 - 5 THROUGH PENETRATION FIRESTOPPING Penetrating Item UL System No. Duct without Damper and Misc. Mechanical FC 7000-7999 Multiple Penetrations FC 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. Penetrating Item UL System No. No Penetrating Item WL 0000-0999* Metallic Pipe or Conduit WL 1000-1999 Non-Metallic Pipe or Conduit WL 2000-2999 Electrical Cables WL 3000-3999 Cable Trays WL 4000-4999 Insulated Pipes WL 5000-5999 Bus Duct and Misc. Electrical WL 6000-6999 Duct without Damper and Misc. Mechanical WL 7000-7999 Multiple Penetrations WL 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. H. Any opening in walls or floors not covered by the listed series of numbers shall be coordinated with the firestopping manufacturer. I. Any openings in floors or walls not described in the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory, or outlined in manufacturer's information shall be sealed in a manner agreed upon by the Firestopping Manufacturer, Owner, and the Authority Having Jurisdiction. PART 3 - EXECUTION 3.1 EXAMINATION A. Ensure all surfaces that contact seal materials are free of dirt, dust, grease, oil, rust, or loose materials. Clean and repair surfaces as required. Remove laitance and form- release agents from concrete. B. Ensure substrate and penetrating items have been permanently installed prior to installing firestopping systems. Ensure penetrating items have been properly spaced and have proper clearance prior to installing firestopping systems. C. Surfaces to which sealing materials are to be installed must meet the selected UL or Intertek / Warnock Hersey system substrate criteria. D. Prime substrates where recommended in writing by through-penetration firestop system manufacturer. Confine primer to area of bond. 600 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 03 - 6 THROUGH PENETRATION FIRESTOPPING 3.2 INSTALLATION A. In existing construction, provide firestopping of openings prior to and after installation of penetrating items. Remove any existing coatings on surfaces prior to firestopping installation. Temporary firestopping shall consist of packing openings with fire resistant mineral wool for the full thickness of substrate, or an alternate method approved by the Authority Having Jurisdiction. All openings shall be temporarily firestopped immediately upon their installation and shall remain so until the permanent UL or listed by Intertek / Warnock Hersey listed firestopping system is installed. B. Install penetration seal materials in accordance with printed instructions of the UL or Intertek / Warnock Hersey Fire Resistance Directory and with the manufacturer's printed application instructions. C. Install dams as required to properly contain firestopping materials within openings and as required to achieve required fire resistance rating. Remove combustible damming after appropriate curing. 3.3 CLEANING AND PROTECTING A. Clean excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not cause damage. B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements. 3.4 IDENTIFICATION A. Provide and install labels adjacent to each firestopping location. Label shall be provided by the firestop system supplier and contain the following information in a contrasting color: 1. The words "Warning - Through Penetration Firestop System - Do Not Disturb. Notify Building Management of Any Damage." 2. Firestop System Supplier; UL or listed by Intertek / Warnock Hersey system number; date installed; contractor name and phone number; manufacturer's representative name, address, and phone number. 3.5 INSPECTION A. All penetrations shall be inspected by the manufacturer's representative to ensure proper installation. B. Access to firestop systems shall be maintained for examination by the Authority Having Jurisdiction at their request. 601 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 03 - 7 THROUGH PENETRATION FIRESTOPPING C. Proceed with enclosing through-penetration firestop system with other construction only after inspection reports are issued and firestop installations comply with requirements. D. The contractor shall allow for visual destructive review of 5% of installed firestop systems (minimum of one) to prove compliance with specifications and manufacturer's instructions and details. Destructive system removal shall be performed by the contractor and witnessed by the engineer and manufacturer's factory representative. The engineer shall have sole discretion of which firestop system installations will be reviewed. The contractor is responsible for all costs associated with this requirement including labor and material for removing and replacing the installed firestop system. If any firestop system is found to not be installed per manufacturer's specific instructions and details, all firestop systems are subject to destructive review and replacement at the engineer's discretion and the contractor's expense. END OF SECTION 22 05 03 602 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 05 - 1 PLUMBING DEMOLITION FOR REMODELING SECTION 22 05 05 PLUMBING DEMOLITION FOR REMODELING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Plumbing Demolition. B. Cutting and Patching. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT A. Materials and equipment shall be as specified in individual Sections. PART 3 - EXECUTION 3.1 EXAMINATION A. THE DRAWINGS ARE INTENDED TO INDICATE THE GENERAL SCOPE OF WORK AND DO NOT SHOW EVERY PIPE, DUCT, OR PIECE OF EQUIPMENT THAT MUST BE REMOVED. B. Where walls, ceilings, etc., are shown as being removed on general drawings, the Contractor shall remove all mechanical equipment, devices, fixtures, piping, ducts, systems, etc., from the removed area. C. Where ceilings, walls, partitions, etc., are temporarily removed and replaced by others, This Contractor shall remove, store, and replace equipment, devices, fixtures, pipes, ducts, systems, etc. D. Verify that abandoned utilities serve only abandoned equipment or facilities. Extend services to facilities or equipment that shall remain in operation following demolition. E. Coordinate work with all other Contractors and the Owner. Schedule removal of equipment to avoid conflicts. F. This Contractor shall verify all existing equipment sizes and capacities where equipment is scheduled to be replaced or modified, prior to ordering new equipment. 3.2 PREPARATION A. Disconnect plumbing systems in walls, floors, and ceilings scheduled for removal. 603 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 05 - 2 PLUMBING DEMOLITION FOR REMODELING B. Provide temporary connections to maintain existing systems in service during construction. When work must be performed on operating equipment, use personnel experienced in such operations. 3.3 DEMOLITION AND EXTENSION OF EXISTING MECHANICAL WORK A. Demolish and extend existing plumbing work under provisions of Division 2 and this Section. B. Remove, relocate, and extend existing installations to accommodate new construction. C. Remove abandoned piping to source of supply and/or main lines. D. Remove exposed abandoned pipes, including abandoned pipes above accessible ceilings. Cut pipes above ceilings, below floors and behind walls. Cap remaining lines. Repair building construction to match original. Remove all clamps, hangers, supports, etc. associated with pipe and duct removal. E. Disconnect and remove mechanical devices and equipment serving equipment that has been removed. F. Repair adjacent construction and finishes damaged during demolition and extension work. G. Extend existing installations using materials and methods compatible with existing installations, or as specified. H. Remove unused sections of domestic water piping back to mains and cap. Capped pipe shall be less than 2 feet from main to prevent "dead legs". 3.4 CUTTING AND PATCHING A. This Contractor is responsible for all penetrations of existing construction required to complete the work of this project. Refer to Section 22 05 29 for additional requirements. B. Penetrations in existing construction should be reviewed carefully prior to proceeding with any work. C. Penetrations shall be neat and clean with smooth and/or finished edges. Core drill where possible for clean opening. D. Repair existing construction as required after penetration is complete to restore to original condition. Use similar materials and match adjacent construction unless otherwise noted or agreed to by the Architect/Engineer prior to start of work. E. Floor slabs may contain conduit systems. This Contractor is responsible for taking any measures required to ensure no conduits or other services are damaged. This includes x-ray or similar non-destructive means. 604 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 05 - 3 PLUMBING DEMOLITION FOR REMODELING F. This Contractor is responsible for all costs incurred in repair, relocations, or replacement of any cables, conduits, or other services if damaged without proper investigation. 3.5 CLEANING AND REPAIR A. Clean and repair existing materials and equipment which remain or are to be reused. B. Clean all systems adjacent to project which are affected by the dust and debris caused by this construction. C. PLUMBING ITEMS REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF THE OWNER. CONTRACTOR SHALL PLACE ITEMS RETAINED BY THE OWNER IN A LOCATION COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL DISPOSE OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN FOR MAINTENANCE PURPOSES. END OF SECTION 22 05 05 605 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 1 PLUMBING SUPPORTS AND ANCHORS SECTION 22 05 29 PLUMBING SUPPORTS AND ANCHORS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Hangers, Supports, and Associated Anchors. B. Equipment Bases and Supports. C. Sleeves and Seals. D. Flashing and Sealing of Equipment and Pipe Stacks. E. Cutting of Openings. F. Escutcheon Plates and Trim. 1.2 REFERENCES A. MSS SP-58 - Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation. B. MSS SP 69 - Pipe Hangers and Supports - Selection and Application. C. MSS SP 89 - Pipe Hangers and Supports - Fabrication and Installation Practices D. MSS SP-127 - Bracing for Piping Systems Seismic-Wind-Dynamic Design, Selection, Application. 1.3 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 22 05 00. Include plastic pipe manufacturers' support spacing requirements. 1.4 WORK FURNISHED BUT INSTALLED UNDER OTHER SECTIONS A. Furnish sleeves and hanger inserts to General Contractor for placement into formwork. PART 2 - PRODUCTS 2.1 SEISMIC RESTRAINTS A. Refer to Section 22 05 50 for additional requirements for seismic restraints. 606 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 2 PLUMBING SUPPORTS AND ANCHORS 2.2 HANGER RODS A. Hanger rods for single rod hangers shall conform to the following: Hanger Rod Diameter Pipe Size Column #1 Column #2 2-1/2" and smaller 3/8" 3/8" 3" through 3-5/8" 3/8" 3/8" 4" and 5" 1/2" 1/2" 6" 3/4" 5/8" Column #1: Steel, cast iron, and glass pipe. Column #2: Copper and plastic pipe. B. Rods for double rod hangers may be reduced one size. Minimum rod diameter is 3/8 inches. C. Hanger rods and accessories used in mechanical spaces or otherwise dry areas shall have ASTM B633 electro-plated zinc finish. D. All hanger rods, nuts, washers, clevises, etc., in damp areas shall have ASTM A123 hot-dip galvanized finish applied after fabrication. This applies to the following areas: 2.3 PIPE AND STRUCTURAL SUPPORTS A. General: 1. Pipe hangers, clamps, and supports shall conform to Manufacturers Standardization Society MSS SP-58, 69, 89, and 127 (where applicable). 2. On all insulated piping, provide at each support an insert of same thickness and contour as adjoining insulation, between the pipe and insulation jacket, to prevent insulation from sagging and crushing. Refer to insulation specifications for materials and additional information. 3. Copper piping located in an exposed area, including indirect waste piping in kitchens and janitor's closets, shall use split ring standoff hangers for copper tubing. Support shall include plastic pipe insert similar to Unistrut Cush-A-Clamp, Hydra-Zorb, Erico Cushion Clamp or Cooper Vibra-Clamp. Use electro- galvanized or more corrosion resistant and threaded rod for floor applications. Use anchors applicable to the wall type with corrosion resistant threaded rod for wall applications. a. Products: 1) B-Line Fig. 3198HCT 2) Anvil Fig. CT138R 3) Nibco/Tolco Fig. 301CT 607 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 3 PLUMBING SUPPORTS AND ANCHORS B. Vertical Supports: 1. Support and laterally brace vertical pipes at every floor level in multi-story structures, unless otherwise noted by applicable codes, but never at intervals over 15 feet Support vertical pipes with riser clamps installed below hubs, couplings, or lugs. Provide sufficient flexibility to accommodate expansion and contraction to avoid compromising fire barrier penetrations or stressing piping at fixed takeoff locations. a. Products: 1) Cooper/B-Line Fig B3373 Series 2) Nibco/Tolco Fig. 82 2. Cold Pipe: Place restrained neoprene mounts beneath vertical pipe riser clamps to prevent sweating of cold pipes. Select neoprene mounts based on the weight of the pipe to be supported. Insulate over mounts. a. Products: 1) Mason RBA, RCA or RDA 2) Mason BR 3. Cold Pipe Alternative: Insulated pipe riser clamp with no thermal bridging between clamp and pipe; water repellant calcium silicate insulation material adhered inside the clamp; ASTM A653 galvanized steel clamp. a. Products: 1) Pipeshields E100 4. Wall supports shall be used where vertical height of structure exceeds minimum spacing requirements. Install wall supports at same spacing as hangers or strut supports along vertical length of pipe runs. Wall supports shall be coordinated with the Structural Engineer. C. Hangers and Clamps: 1. Oversize all hangers, clamps, and supports on insulated piping to allow insulation and jacket to pass through unbroken. This applies to both hot and cold pipes. 2. Hangers in direct contact with bare copper pipe shall include plastic pipe insert similar to Unistrut Cush-A-Clamp, Hydra-Zorb, Erico Cushion Clamp or Cooper Vibra-Clamp within their temperature limits of -65°F to +275°F. 3. Vertical cold pipe drops and rough-ins to fixtures shall be supported by insulated pipe clamps to prevent thermal bridging and condensation. 4. On all insulated piping, provide a semi-cylindrical metallic shield and vapor barrier jacket. 608 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 4 PLUMBING SUPPORTS AND ANCHORS 5. Unless otherwise indicated, hangers shall be as follows: a. Clevis Type: 1) Service: Bare Metal Pipe, Rigid Plastic Pipe, Insulated Cold Pipe, Insulated Hot Pipe - 3 inches & Smaller 2) Products: Bare Steel Plastic or Insulated Pipe: a) Anvil Fig. 260 b) Cooper/B-Line Fig. 3100 c) Nibco/Tolco Fig. 1 3) Products: Bare Copper Pipe: a) Cooper/B-Line Fig. B3100C b) Nibco/Tolco Fig. 81PVC b. Continuous Channel with Clevis Type: Service: Plastic Tubing, Flexible Hose, Soft Copper Tubing: 1) Products: a) Cooper/B-Line Fig. B3106, with Fig. B3106V b) Nibco/Tolco Fig. 1V c. Adjustable Swivel Ring Type: 1) Service: Bare Metal Pipe - 4 inches and Smaller 2) Bare Steel Pipe: a) Anvil Fig. 69 b) Cooper/B-Line Fig. B3170NF c) Nibco/Tolco Fig. 200 3) Bare Copper Pipe: a) Cooper/B-Line Fig. B3170CTC b) Nibco/Tolco Fig. 203 6. Support may be fabricated from U-channel strut or similar shapes. Piping less than 4" in diameter shall be secured to strut with clamps of proper design and capacity as required to maintain spacing and alignment. Strut shall be independently supported from hanger drops or building structure. Size and support shall be per manufacturer's installation requirements for structural support of piping. Clamps shall not interrupt piping insulation. a. Strut used in mechanical spaces or otherwise dry areas shall have ASTM B633 electro-plated zinc finish. b. Strut used in damp areas listed in hanger rods shall have ASTM A123 hot- dip galvanized finish applied after fabrication. 609 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 5 PLUMBING SUPPORTS AND ANCHORS 7. Unless otherwise indicated, pipe supports for use with struts shall be as follows: a. Clamp Type: 1) Service: Bare Metal Pipe, Rigid Plastic Pipe, Insulated Cold Pipe, Insulated Hot Pipe - 3 inches and smaller 2) Clamps in direct contact with copper pipe shall include plastic pipe insert similar to Unistrut Cush-A-Clamp, Hydra-Zorb, Erico Cushion Clamp or Cooper Vibra-Clamp. 3) Pipes subject to expansion and contraction shall have clamps oversized to allow limited pipe movement. 4) Bare Steel, Plastic or Insulated Pipe: a) Unistrut Fig. P1100 or P2500 b) Cooper/B-Line Fig. B2000 or B2400 c) Nibco/Tolco Fig. A-14 or 2STR 5) Bare Copper Pipe: a) Cooper/B-Line Fig. BVT D. Upper (Structural) Attachments: 1. Unless otherwise shown, upper attachments for hanger rods or support struts shall be as follows: a. Steel Structure Clamps: C-Type Wide Flange Beam Clamps (for use on top and/or bottom of wide flanges. Not permitted for use with bar-joists.): 1) Products: a) Anvil Fig. 92 b) Cooper/B-Line Fig. B3033/B3034 c) Nibco/Tolco 68 b. Concentrically Loaded Open Web Joist Hangers (for use with bar joists): 1) Products: a) MCL. M1, M2 or M3 c. Concrete Anchors: Fasten to concrete using cast-in or post-installed anchors designed per the requirements of Appendix D of ACI 318-05. Post- installed anchors shall be qualified for use in cracked concrete by ACI- 355.2. 610 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 6 PLUMBING SUPPORTS AND ANCHORS d. Wood Anchors: Tension wood rod hanger for suspending 3/8" threaded rod. Zinc plated carbon steel. 1) Minimum allowable tension loads for Douglass Fir/Southern Pine: a) 3/8" diameter rod; 2-1/2" shank: 600 lb/590 lb. b) Load values are based on full shank penetration into wood member. Minimum edge distance 3/4". Minimum end distance 3-1/4". 2) Limitations: a) Truss: Do not hang from wood trusses without truss manufacturer or Structural Engineer’s approval. b) Sheetrock/Gypsum Ceiling: When drilling through non-wood materials (e.g., sheet rock, gypsum, etc.), increase shank length by depth of non-wood materials. c) Plywood Flooring/Roofing: Do not hang from plywood floor or roofing. d) Spacing: Refer to wood structure spacing of hangers. 3) Products: a) Simpson RWV b) DeWALT c) ITI Sammys GT25 E. Supports: 1. Provide sufficient clips, inserts, hangers, racks, rods, and auxiliary steel to securely support all suspended material, equipment and conduit without sag. 2. Hang heavy equipment from concrete floors or ceilings with Architect/Engineer- approved concrete inserts, furnished and installed by the Contractor whose work requires them, except where indicated otherwise. F. Grout: 1. Grout shall be non-shrinking premixed (Master Builders Company "Embecco"), unless otherwise indicated on the drawings or approved by the Architect/Engineer. 2. Use Mix No. 1 for clearances of 1" or less, and Mix No. 2 for all larger clearances. 3. Grout under equipment bases, around pipes, at pipe sleeves, etc., and where shown on the drawings. 2.4 OPENINGS IN FLOORS, WALLS AND CEILINGS A. Exact locations of all openings for the installation of materials shall be determined by the Contractor and given to the General Contractor for installation or construction as the structure is built. 611 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 7 PLUMBING SUPPORTS AND ANCHORS B. Coordinate all openings with other Contractors. C. Hire the proper tradesman and furnish all labor, material and equipment to cut openings in or through existing structures, or openings in new structures that were not installed, or additional openings. Repair all spalling and damage to the satisfaction of the Architect/Engineer. Make saw cuts before breaking out concrete to ensure even and uniform opening edges. D. Said cutting shall be at the complete expense of each Contractor. Failure to coordinate openings with other Contractors shall not exempt the Contractor from providing openings at Contractor's expense. E. Do not cut structural members without written approval of the Architect or Structural Engineer. F. Exposed Housing Penetrations: Seal pipes with surface temperature below 150°F, penetrating housings with conical stepped, white silicone, EPDM or neoprene pipe flashings and stainless steel clamps equal to Portals Plus Pipe Boots or Pipetite. 2.5 ROOF PENETRATIONS A. Roof Curb Enclosure: Provide weatherproof roof curb and enclosure for pipe penetrations. Refer to drawings for details. B. Conical Pipe Boot: Seal pipes with surface temperature below 150°F penetrating single-ply roofs with conical stepped, UV-resistant silicone, EPDM or neoprene pipe flashings and stainless steel clamps equal to Portals Plus Pipe Boots or Pipetite. Color: White shall match roofing membrane. C. Break insulation only at the clamp for pipes between 60°F and 150°F. Seal outdoor insulation edges watertight. 2.6 ESCUTCHEON PLATES AND TRIM A. Fit escutcheons to all insulated or uninsulated exposed pipes passing through walls, floors, or ceilings of finished rooms. B. Escutcheons shall be heavy gauge, cold rolled steel, copper coated under a chromium plated finish, heavy spring clip, rigid hinge and latch. C. Install galvanized steel (unless otherwise indicated) trim strip to cover vacant space and raw construction edges of all rectangular openings in finished rooms. This includes pipe openings. 2.7 PIPE PENETRATIONS A. Seal all pipe penetrations. Seal non-rated walls and floor penetrations with grout or caulk. Backing material may be used. B. Seal fire rated wall and floor penetrations with fire seal system as specified. 612 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 8 PLUMBING SUPPORTS AND ANCHORS 2.8 FINISH A. Prime coat exposed steel hangers and supports. Hangers and supports in crawl spaces, pipe shafts, and suspended ceiling spaces are not considered exposed. PART 3 - EXECUTION 3.1 PLUMBING SUPPORTS AND ANCHORS A. General Installation Requirements: 1. Install all items per manufacturer's instructions. 2. Coordinate the location and method of support of piping systems with all installations under other Divisions and Sections of the Specifications. 3. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welding. 4. Supports shall extend directly to building structure. Do not support piping from duct hangers unless coordinated with sheet metal contractor prior to installation. Do not allow lighting or ceiling supports to be hung from piping supports. B. Supports Requirements: 1. Where building structural steel is fireproofed, all hangers, clamps, auxiliary steel, etc., which attach to it shall be installed prior to application of fireproofing. Repair all fireproofing damaged during pipe installation. 2. Set all concrete inserts in place before pouring concrete. 3. Furnish, install and prime all auxiliary structural steel for support of piping systems that are not shown on the Drawings as being by others. 4. Install hangers and supports complete with lock nuts, clamps, rods, bolts, couplings, swivels, inserts and required accessories. 5. Hangers for horizontal piping shall have adequate means of vertical adjustment for alignment. C. Pipe Requirements: 1. Support all piping and equipment, including valves, strainers, traps and other specialties and accessories to avoid objectionable or excessive stress, deflection, swaying, sagging or vibration in the piping or building structure during erection, cleaning, testing and normal operation of the systems. 2. Do not, however, restrain piping to cause it to snake or buckle between supports or to prevent proper movement due to expansion and contraction. 3. Support piping at equipment and valves so they can be disconnected and removed without further supporting the piping. 4. Piping shall not introduce strains or distortion to connected equipment. 5. Parallel horizontal pipes may be supported on trapeze hangers made of structural shapes and hanger rods; otherwise, pipes shall be supported with individual hangers. 6. Trapeze hangers may be used where ducts interfere with normal pipe hanging. 7. Provide additional supports where pipe changes direction, adjacent to flanged valves and strainers, at equipment connections and heavy fittings. 613 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 9 PLUMBING SUPPORTS AND ANCHORS 8. Provide at least one hanger adjacent to each joint in grooved end steel pipe with mechanical couplings. D. Provided the installation complies with all loading requirements of truss and joist manufacturers, the following practices are acceptable: 1. Loads of 100 lbs. or less may be attached anywhere along the top or bottom chords of trusses or joists with a minimum 3' spacing between loads. 2. Loads greater than 100 lbs. must be hung concentrically and may be hung from top or bottom chord, provided one of the following conditions is met: a. The hanger is attached within 6" from a web/chord joint. b. Additional L2x2x1/4 web reinforcement is installed per manufacturer's requirements. 3. It is prohibited to cantilever a load using an angle or other structural component that is attached to a truss or joist in such a fashion that a torsional force is applied to that structural member. 4. If conditions cannot be met, coordinate installation with truss or joist manufacturer and contact Architect/Engineer. E. After piping and insulation installation are complete, cut hanger rods back at trapeze supports so they do not extend more than 3/4" below bottom face of lowest fastener and blunt any sharp edges. F. Do not exceed the manufacturer's recommended maximum load for any hanger or support. G. Wood Structure: Spacing of hangers shall not exceed the compressive strength of the insulation inserts, and in no case shall exceed the following: 1. Steel and Fiberglass (Std. Weight or Heavier - Liquid Service): a. Maximum Spacing: 1) 1-1/4" & under: 7'-0" 2) 1-1/2": 9'-0" 3) 2": 10'-0" 4) 2-1/2": 11'-0" 5) 3": 12'-0" 6) 4" through 6": 12'-0" 7) 8": 9'-0" 8) 10": 6'-0" 9) 12": 4'-0" 614 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 10 PLUMBING SUPPORTS AND ANCHORS 2. Steel (Std. Weight or Heavier - Vapor Service): a. Maximum Spacing: 1) 1-1/4" and under: 9'-0" 2) 1-1/2": 12'-0" 3) 2" & larger: 12'-0" 4) 2-1/2": 11'-0" 5) 3": 12'-0" 6) 4" through 8": 12'-0" 7) 10": 9'-0" 8) 12": 6'-0" 3. Hard Drawn Copper & Brass (Liquid Service): a. Maximum Spacing: 1) 3/4" and under: 5'-0" 2) 1": 6'-0" 3) 1-1/4": 7'-0" 4) 1-1/2" 8'-0" 5) 2": 8'-0" 6) 2-1/2": 9'-0" 7) 3": 10'-0" 8) 4": 12'-0" 9) 6": 12'-0" 4. Hard Drawn Copper & Brass (Vapor Service): a. Maximum Spacing: 1) 3/4" & under: 7'-0" 2) 1": 8'-0" 3) 1-1/4": 9'-0" 4) 1-1/2": 10'-0" 5) 2": 11'-0" 6) 2-1/2" & larger: 12'-0" 5. Ultra-Flexible Pipe, Flexible Hose, and Soft Copper Tubing: a. Continuous channel with hangers maximum 8'-0" OC. H. Wood Structure: Spacing of hangers shall not exceed the compressive strength of the insulation inserts, and in no case shall exceed the following: 1. Steel and Fiberglass (Std. Weight or Heavier - Liquid Service): a. Maximum Spacing: 1) 1-1/4" & under: 7'-0" 2) 1-1/2": 9'-0" 615 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 11 PLUMBING SUPPORTS AND ANCHORS 3) 2": 10'-0" 4) 2-1/2": 11'-0" 5) 3": 12'-0" 6) 4" through 6": 12'-0" 7) 8": 9'-0" 8) 10": 6'-0" 9) 12": 4'-0" 2. Steel (Std. Weight or Heavier - Vapor Service): a. Maximum Spacing: 1) 1/2" and under: 6'-0" 2) 3/4" to 1": 8'-0" 3) 1-1/4" and under: 9'-0" 4) 1-1/2": 10'-0" 5) 2" & larger: 10'-0" 6) 3": 12'-0" 7) 4" through 8": 12'-0" 8) 10": 9'-0" 9) 12": 6'-0" 3. Hard Drawn Copper & Brass (Liquid Service): a. Maximum Spacing: 1) 3/4" & under: 5'-0" 2) 1": 6'-0" 3) 1-1/4": 6'-0" 4) 1-1/2": 6'-0" 5) 2": 8'-0" 6) 2-1/2": 9'-0" 7) 3": 10'-0" 8) 4": 10'-0" 9) 6": 10'-0" 4. Hard Drawn Copper & Brass (Vapor Service): a. Maximum Spacing: 1) 3/4" & under: 6'-0" 2) 1": 6'-0" 3) 1-1/4": 6'-0" 4) 1-1/2": 6'-0" 5) 2": 10'-0" 6) 2-1/2" & larger: 10'-0" 5. Ultra-Flexible Pipe, Flexible Hose, and Soft Copper Tubing: a. Continuous channel with hangers maximum 8'-0" OC. 616 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 29 - 12 PLUMBING SUPPORTS AND ANCHORS I. Installation of hangers shall conform to MSS SP-58, 69, 89 and the applicable Plumbing Code. END OF SECTION 22 05 29 617 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 1 Seismic Requirements for Equipment and Supports SECTION 22 05 50 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Seismic Requirements. 1.2 QUALITY ASSURANCE A. General: 1. The contractor shall retain a specialty consultant or equipment manufacturer to develop a seismic restraint and support system and perform seismic calculations in accordance with these specifications, state, and local codes. 2. Items used for seismic restraint of equipment and systems shall be specifically manufactured for seismic restraint. 3. These requirements are beyond those listed in Section 22 05 29 of these specifications. Where a conflict arises between the seismic requirements of this section and any other section, the Architect/Engineer shall be immediately notified for direction to proceed. B. Manufacturer: 1. System Supports/Restraints: Company specializing in the manufacture of products specified in this Section. 2. Equipment: Each company providing equipment that must meet seismic requirements shall provide certification included in project submittals the equipment supplied for the project meets or exceeds the seismic requirements of the project. C. Testing Agency: An independent testing agency, acceptable to Authorities Having Jurisdiction, with experience and capability to conduct the testing indicated. D. Installer: Company specializing in performing the work of this Section. 1.3 REFERENCES A. International Building Code, 2018. B. California Building Code (CBC)ASHRAE - A Practical Guide to Seismic Restraint. C. ASCE 7-16, Chapter 13. D. SMACNA - Seismic Restraint Manual Guidelines for Mechanical Systems. E. NFPA 13 - Installation of Sprinkler Systems. 618 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 2 Seismic Requirements for Equipment and Supports F. NFPA 14 - Standpipe and Hose Systems. 1.4 SUBMITTALS A. Submit under provisions of Section 22 05 00. B. Submittal to Code Official: 1. Contractor shall submit copies of the seismic shop drawings to the governing code authority for approval. C. Shop Drawings: 1. Calculations, restraint selections, and installation details shall be designed and sealed by a Professional Structural Engineer licensed in the state where the project is located experienced in seismic restraint design and installation. 2. Coordination Drawings: Plans and sections drawn to scale, coordinating seismic bracing of mechanical components with other systems and equipment in the vicinity, including other seismic restraints. 3. Manufacturer's Certifications: Professional Structural Engineer licensed in the state where the project is located shall review and approve manufacturer's certifications of compliance. 4. System Supports/Restraints - Submit for each condition requiring seismic bracing: a. Calculations for each seismic brace and detail utilized on the project. b. Plan drawings showing locations and types of seismic braces on contractor fabrication/installation drawings. c. Cross-reference between details and plan drawings to indicate exactly which brace is being installed at each location. Details provided are to clearly indicate attachments to structure, correctly representing the fastening requirements of bracing. d. Clear indication of brace design forces and maximum potential component forces at attachment points to building structure for confirmation of acceptability by the Structural Engineer of Record. 5. Equipment - Submit for each piece of equipment supplied: a. Certification that the equipment supplied for the project meets or exceeds the seismic requirements specified. b. Specific details of seismic design features of equipment and maximum seismic loads imparted to the structural support. c. Engineering calculations and details for equipment anchorage and support structure. 619 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 3 Seismic Requirements for Equipment and Supports D. A seismic restraint designer shall be provided whether or not exceptions listed in the applicable building code are met. If seismic restraints are not provided for a system that requires seismic bracing, the seismic designer shall submit a signed and sealed letter to the Architect/Engineer and Authorities Having Jurisdiction stating the exceptions, along with code reference, utilized for each item. Seismic designer shall review system installation for general conformance to the exception requirements stated in the code and document, in writing, the system has been installed in accordance to the exception. 1.5 TESTING AND INSPECTION A. Special Inspection and Testing shall be done in accordance with Chapter 17 of the California Building Code. B. The Contractor shall employ a Special Inspection Agency to perform the duties and responsibilities specified in Section 1704 and 1705. C. Work performed on the premises of a fabricator approved by the building official need not be tested and inspected. The fabricator shall submit a certificate of compliance that the work has been performed in accordance with the approved plans and specifications to the building official and the Architect and Engineer of Record. D. The Special Inspection Agency shall furnish inspection reports to the building official, the Owner, the Architect, the Engineer of Record, and the General Contractor. The reports shall be completed and furnished within 48 hours of inspected work. A final signed report stating whether the work requiring special inspection was, to the best of the Special Inspection Agency's knowledge, in conformance with the approved plans and specifications shall be submitted. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, protect and handle products to site. Accept material on site in factory containers and packing. Inspect for damage. Protect from damage and contamination by maintaining factory packaging until installation. Follow manufacturer's instructions for storage. 1.7 DESIGN REQUIREMENTS A. This project is subject to the seismic bracing requirements of the International Building Code, 2018 edition. B. This project is subject to the seismic bracing requirements of the California Building Code. C. The following criteria are applicable to this project: 1. Seismic Use Group: III 2. Occupancy Category: III 3. Risk Category: III 4. Seismic Importance Factor: IE = 1.25 5. Seismic Design Category: D 620 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 4 Seismic Requirements for Equipment and Supports 6. Component Amplification Factors (ap) and Component Response Modification Factors (Rp) shall be taken from Table 1621.3r in CBC 2016 for the individual equipment or system being restrained. 7. Component Importance Factors (Ip) shall be taken from Section 1621.1.6 in CBC 2016 for the individual equipment or system being restrained. 8. The total height of the structure and the height of the system to be restrained within the structure shall be determined in coordination with architectural plans and the General Contractor. D. Forces shall be calculated with the above requirements and Equations of CBC 2016 unless exempted by 13.1.4. E. Equipment shall meet California Building Code and ASCE 7 seismic qualification requirements in concurrence with ICC ES AC156 Acceptance Criteria for Seismic Qualification by Shake-Table Testing of Nonstructural Components and Systems. F. All seismic anchorage and bracing shall comply with FM Global Property Loss Prevention Data Sheet 1-11, Fire Following Earthquakes. 1.8 COORDINATION A. Coordinate layout and installation of seismic bracing with building structural systems and architectural features, and with mechanical, fire-protection, electrical and other building features in the vicinity. B. Coordinate concrete bases with building structural system. 1.9 WARRANTY A. Provide one-year warranty on parts and labor for manufacturer defects and installation workmanship. PART 2 - PRODUCTS 2.1 SUPPLIERS A. Following is a partial list of manufacturer/supplier contact information for seismic restraints: 1. B-Line Systems, Inc. (800) 851-7415, www.b-line.com. 2. Unistrut Corporation http://www.unistrut.us/ 3. Kinetics Noise Control (877) 457-2695, www.kineticsnoise.com. 4. Mason Industries, Inc. www.mason-ind.com. 5. Loos & Co., Inc. (800) 321-5667, www.loosnaples.com. 6. Tolco (909) 737-5599, www.tolco.com 7. ISAT 877.523.6060, www.isatsb.com 8. Vibro-Acoustics (416) 291-7371, https://virs.vibro-acoustics.com/ 621 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 5 Seismic Requirements for Equipment and Supports 2.2 SEISMIC DESIGN CRITERIA A. This section describes the requirements for seismic restraint of systems and equipment related to continued operation of the facility after a design seismic event. B. Definitions 1. Stay in Place: a. All systems and equipment shall be anchored and restrained such that the anchoring system is intended not to fail and equipment and/or system components will not fall. 2.3 SEISMIC BRACING AND SUPPORT OF SYSTEMS AND COMPONENTS A. General: 1. Seismic restraint designer shall coordinate all attachments with the Structural Engineer of Record; refer to submittal requirements. 2. The seismic restraint design shall be based on actual equipment data obtained from manufacturer's submittals or the manufacturer. The equipment manufacturer shall verify and provide written certification the attachment points on the equipment can accept the combination of seismic, weight, and other imposed loads. 3. Design analysis shall include calculated dead loads, static seismic loads, and capacity of materials utilized for the connection of the equipment or system to the structure. 4. Analysis shall detail anchoring methods, bolt diameter, embedment, and weld length. 5. All seismic restraint devices shall be designed to accept without failure the forces calculated per the applicable building code. 6. All seismic restraints and combination isolator/restraints shall have verification of their seismic capabilities witnessed by an independent testing agency. B. Friction from gravity loads shall not be considered resistance to seismic forces. C. Fire protection systems shall meet the requirements of NFPA-13 and NFPA-14 for the building seismic requirements. D. Housekeeping Pads: 1. Reinforced housekeeping pads shall be provided to handle shear, tension, and compression forces with proper reinforcement, doweling, and attachments connecting the pad to the structural slab. 2.4 SEISMIC RESTRAINT AND CONSTRUCTION OF EQUIPMENT A. Equipment supplied for the project shall be designed to meet the requirements of lateral forces calculated using the applicable code and method described above. 622 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 6 Seismic Requirements for Equipment and Supports B. The following is a partial list of equipment that shall be restrained and that shall be constructed to meet seismic forces described in this section: 1. Pumps 2. Tanks 2.5 MATERIALS A. Use the following materials for restraints: 1. Indoor Dry Locations: Steel, zinc plated. 2. Outdoors and Damp Locations: Galvanized steel. 3. Corrosive Locations: Stainless steel. 2.6 ANCHORAGE AND STRUCTURAL ATTACHMENT COMPONENTS A. Strength: Defined in reports by ICC Evaluation Service or another agency acceptable to authorities having jurisdiction. 1. Structural Safety Factor: Strength in tension and shear of components used shall be at least two times the maximum seismic forces to which they will be subjected. B. Concrete and Masonry Anchor Bolts and Studs: Steel-expansion wedge type. Comply with IBC, ACI and ICC ES requirements for cracked concrete anchors. C. Concrete Inserts: Steel-channel type. D. Through Bolts: Structural type, hex head, high strength. Comply with ASTM F3125, Grade A 325. E. Welding Lugs: Comply with MSS SP-69, Type 57. F. Beam Clamps for Steel Beams and Joists: Double sided. Single-sided type is not acceptable. G. Bushings for Floor-Mounted Equipment Anchors: Neoprene units designed for seismically rated rigid equipment mountings, and matched to the type and size of anchor bolts and studs used. H. Bushing Assemblies for Wall-Mounted Equipment Anchorage: Assemblies of neoprene elements and steel sleeves designed for seismically rated rigid equipment mountings, and matched to the type and size of attachment devices used. 2.7 SEISMIC BRACING COMPONENTS A. Slotted Steel Channel: 1-5/8-by-1-5/8-inch cross section, formed from 0.1046-inch- thick steel, with 9/16-by-7/8-inch slots at a maximum of 2 inches o.c. in webs, and flange edges turned toward web. 1. Materials for Channel: ASTM A 1011, GR 33. 623 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 7 Seismic Requirements for Equipment and Supports 2. Materials for Fittings and Accessories: ASTM A 635, ASTM A 576, or ASTM A 36. 3. Fittings and Accessories: Products of the same manufacturer as channels and designed for use with that product. 4. Finish: Baked, rust-inhibiting, acrylic-enamel paint applied after cleaning and phosphate treatment, unless otherwise indicated. B. Channel-Type Bracing Assemblies: Slotted steel channel, with adjustable hinged steel brackets and bolts. C. Cable-Type Bracing Assemblies: Zinc-coated, high-strength steel wire rope cable attached to steel thimbles, brackets, and bolts designed for cable service. 1. Arrange units for attachment to the braced component at one end and to the structure at the other end. 2. Wire Rope Cable: Comply with ASTM A 603. Use 49- or 133-strand cable with a minimum strength of 2 times the calculated maximum seismic force to be resisted. D. Hanger Rod Stiffeners: Slotted steel channels with internally bolted connections to hanger rod. PART 3 - EXECUTION 3.1 INSTALLATION A. Refer to the applicable code sections and Authority Having Jurisdiction for the exact seismic restraint requirements of piping, ductwork, conduit, equipment, etc. B. Layout of transverse and longitudinal bracing shall follow recommendations of approved design standards listed in Part 1 of this specification section. C. All rigid floor mounted equipment shall have a resilient media between the equipment mounting hole and the anchor bolt in concrete. D. All seismic restraint systems shall be installed in strict accordance with the manufacturer's written instructions and all certified submittal data. E. Installation of seismic restraints shall not cause any change in position of equipment, piping, or ductwork, resulting in stresses or misalignment. F. No rigid connections between equipment and the building structure shall be made that degrade the noise and vibration-isolation system specified. G. Do not install any equipment, piping, duct, or conduit that makes rigid connections with the building unless isolation is not specified. 624 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 8 Seismic Requirements for Equipment and Supports H. Coordinate work with all other trades to avoid rigid contact with the building. Any conflicts with other trades that will result in rigid contact with equipment or piping due to inadequate space or other unforeseen conditions shall be brought to the Architect/Engineer's attention prior to specific equipment selection. I. Prior to installation, bring to the Architect/Engineer's attention any discrepancies between the specifications and the field conditions, or changes required due to specific equipment selection. J. Bracing may occur from flanges of structural beams, upper truss cords of bar joists, cast in place inserts, or International Code Council approved seismic anchors for installation in concrete. K. Cable restraints shall be installed slightly slack to avoid short-circuiting the isolated suspended equipment, ductwork, piping, or conduit. L. Cable assemblies shall be installed taut on non-isolated systems. Solid braces may be used in place of cables on rigidly attached systems only. M. Do not install cables over sharp corners. N. Brace support rods when necessary to accept compressive loads. Welding of compression braces to the vertical support rods is not acceptable. O. Provide reinforced clevis bolts when required. P. The vibration isolation manufacturer shall furnish integral structural steel bases as required. Independent steel rails are not acceptable. Q. Post-Installed anchors shall be provided to meet seismic requirements. R. Vertical pipe risers flexibly supported to accommodate thermal motion and/or pipe vibration shall be guided to maintain pipe stability and provide horizontal seismic restraint. S. Seismic restraints shall be mechanically attached to the system. Looping restraints around the system is not acceptable. T. Piping crossing building seismic or expansion joints, passing from building to building, or supported from different portions of the building shall be installed to allow differential support displacements without damaging the pipe, equipment connections, or support connections. Pipe offsets, loops, anchors, and guides shall be installed as required to provide required motion capability and limit motion of adjacent piping. U. Water tanks shall be secured to their saddles by welding or proper concrete attachment, and those saddles shall be properly attached to the structure. V. Brace all terminal units with water coils as required by the building code and provide flexible connection to the coil if bracing is required. 625 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 50 - 9 Seismic Requirements for Equipment and Supports W. Independently brace duct mounted equipment (terminal units, in-line fans, etc.) and the associated suspended ductwork. X. Do not brace a system to two different structures such as a wall and a ceiling. Y. Provide appropriately sized openings in walls, floors, and ceilings for anticipated seismic movement. Provide fire seal systems in fire-rated walls. Z. Positively attach all roof mounted equipment to roof curbs. Positively attach all roof curbs to building structure. AA. Exposed seismic supports in occupied areas shall be guarded or covered to protect occupants. BB. Coordinate seismic bracing of architecturally exposed ductwork with the Architect/Engineer. 3.2 SEISMIC RESTRAINT EXCLUSIONS A. Refer to the applicable code sections and Authority Having Jurisdiction for allowable exclusions. END OF SECTION 626 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 53 - 1 PLUMBING IDENTIFICATION SECTION 22 05 53 PLUMBING IDENTIFICATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Identification of products installed under Division 22. 1.2 REFERENCES A. ANSI/ASME A13.1 - Scheme for the Identification of Piping Systems. B. ASTM B-1, B-3, and B-8 for copper conductors. C. ASTM D-1248 for Polyethylene Extrusion Materials, ICEA S-70-547 Weatherproof Resistant Polyethylene Conductors, ICEA S-61-402/NEMA WC5 Thermoplastic Insulated Wire & Cable, ICEA S-95-658/NEMA WC70 Non-Shielded 0 “ 2kV Cables. D. CGA Pamphlet C-9, Standard Color-Marking of Compressed Gas Cylinders for Medical Use. E. UL 1581 Standard for Electrical Wires, Cables, and Flexible Cords. 1.3 SUBMITTALS A. Include valve chart and schedule listing valve tag number, location, function, and valve manufacturer's name and model number. PART 2 - PRODUCTS 2.1 MANUFACTURERS 1. 3M 2. Bunting 3. Calpico 4. Craftmark 5. Emedco 6. Kolbi Industries 7. Seton 8. W.H. Brady 9. Marking Services 627 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 53 - 2 PLUMBING IDENTIFICATION 2.2 MATERIALS A. All pipe markers (purchased or stenciled) shall conform to ANSI A13.1. Marker lengths and letter sizes shall be at least the following: OD of Pipe or Insulation Marker Length Size of Letters Up to and including 1-1/4" 8" 1/2" 1-1/2" to 2" 8" 3/4" 2-1/2" to 6" 12" 1-1/4" Plastic tags may be used for outside diameters under 3/4" B. Plastic Nameplates: Laminated three-layer phenolic with engraved black, 1/4" minimum letters on light contrasting background. C. Brass Tags: Brass background with engraved black letters. Tag size minimum 1-1/2" square or 1-1/2" round. D. Plastic Pipe Markers: Semi-rigid plastic, preformed to fit around pipe or pipe covering; indicating flow direction and fluid conveyed. E. Underground Pipe Markers: Bright colored continuously printed plastic ribbon tape 6" wide by 3.5 mils thick, manufactured for direct burial, with aluminum foil core for location by non-ferric metal detectors and bold lettering identifying buried item. F. Tracer Wire: 1. Single copper conductors shall be solid or stranded annealed or hard uncoated copper per UL83 and ASTM requirements. Tracer tape or copper-coated steel wire is not acceptable. 2. Conductor shall be insulated with HMWPE as specified and applied in a concentric manner. The minimum at any point shall not be less than 90% of the specified average thickness in compliance with UL 83. 3. Tracer wire shall be continuously spark tested at 7500 Volts DC. Other electrical and mechanical tests shall be in accordance with UL 1581. PART 3 - EXECUTION 3.1 INSTALLATION A. Install all products per manufacturer's recommendations. B. Degrease and clean surfaces to receive adhesive for identification materials. C. Valves: 1. All valves (except shutoff valves at equipment) shall have numbered tags. 2. Provide or replace numbered tags on all existing valves that are connected to new systems or that have been revised. 628 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 53 - 3 PLUMBING IDENTIFICATION 3. Provide all existing valves used to extend utilities to this project with numbered tags. Review tag numbering sequence with the Owner prior to ordering tags. 4. Secure tags with heavy duty key chain and brass "S" link or with mechanically fastened plastic straps. 5. Attach to handwheel or around valve stem. On lever operated valves, drill the lever to attach tags. 6. Number all tags and show the service of the pipe. 7. Provide one Plexiglas framed valve directory listing all valves, with respective tag numbers, uses and locations. Mount directory in location chosen by the Architect/Engineer. 8. Provide one 36" x 24" minimum Plexiglas framed piping schematic showing valve locations with respective tag numbers. Mount directory in location chosen by the Architect/Engineer. 9. Provide two sets of laminated 8-1/2" x 11" (letter size) copies of a valve directory listing all valves, with respective tag numbers, uses, and locations. The directory shall be reviewed by the Owner and Architect/Engineer prior to laminating final copies. Laminated copies shall have brass eyelet in at least one corner for easy hanging. D. Pipe Markers: 1. Adhesive Backed Markers: Use Brady Style 1, 2, or 3 on pipes 3" diameter and larger. Use Brady Style 4, 6, or 8 on pipes under 3" diameter. Similar styles by other listed manufacturers are acceptable. Secure all markers at both ends with a wrap of pressure sensitive tape completely around the pipe. 2. Snap-on Markers: Use Seton "Setmark" on pipes up to 5-7/8" OD. Use Seton "Setmark" with nylon or Velcro ties for pipes 6" OD and over. Similar styles by other listed manufacturers are acceptable. 3. Apply markers and arrows in the following locations where clearly visible: a. At each valve. b. On both sides of walls that pipes penetrate. c. At least every 20 feet along all pipes. d. On each riser and each leg of each "T" joint. e. At least once in every room and each story traversed. 4. Underground Pipe Markers: Install 8" to 10" below grade, directly above buried pipes. E. Equipment: 1. All equipment not easily identifiable such as controls, relays, gauges, etc.; and all equipment in an area remote from its function shall have nameplates or plastic tags listing name, function, and drawing symbol. Do not label exposed equipment in public areas. 2. Mechanical equipment that is not covered by the U.S. National Appliance Energy Conservation Act (NAECA) of 1987 shall carry a permanent label installed by the manufacturer stating that the equipment complies with the requirements of ASHRAE 90.1. 629 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 05 53 - 4 PLUMBING IDENTIFICATION F. Tracer Wire: 1. Tracer wire shall be installed on top of all non-metallic buried utilities. 2. Tracer wire shall be taped directly to plastic water or drain pipe. 3. Tracer wire shall not be fastened directly or indirectly to gas piping. 4. Tracer wire when attached shall be secured to the pipe a minimum of every 10 feet and at all changes of direction. 5. Tape shall be Polyken "930-35", Protecto-Wrap "310", or approved equal. 6. Tracer wire shall be continuous between boxes and shall be tested for continuity. 7. Splices in tracer wire shall be made with a water proof splice kit to prevent corrosion. Wire nuts shall not be used. 8. The tracer wire shall daylight to grade through a 2" PVC conduit, at the point of the utility entrance to building. PVC conduit shall be capped and labeled as future contact point to locate the utility. 3.2 SCHEDULE A. Pipes to be marked shall be labeled with text as follows, regardless of which method or material is used: 1. CONDENSATE DRAIN: White lettering; green background 2. DOMESTIC COLD WATER: White lettering; green background 3. DOMESTIC HOT WATER - 115°F: White lettering; green background 4. DOMESTIC HOT WATER CIRCULATING - 115°F: White lettering; green background 5. SANITARY SEWER: Black lettering; yellow background 6. VENT: Black lettering; yellow background 7. STORM SEWER (PRIMARY AND SECONDARY): White lettering; green background 8. All Underground Pipes: Varies 9. Tracer Wire - All other buried types: White lettering; green background END OF SECTION 22 05 53 630 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 07 19 - 1 PLUMBING PIPING INSULATION SECTION 22 07 19 PLUMBING PIPING INSULATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Piping Insulation. B. Insulation Jackets. 1.2 QUALITY ASSURANCE A. Applicator: Company specializing in piping insulation application with five years minimum experience. B. Materials: Listed and labeled for flame spread/smoke developed rating of no more than 25/50 when tested per ASTM E84 or UL 723 as required by code. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers with appropriate markings of applicable testing agency. C. Products shall not contain asbestos, lead, mercury, or mercury compounds. D. Products that come in contact with stainless steel shall have a leachable chloride content of less than 50 ppm when tested according to ASTM C 871. Insulation materials for use on austenitic stainless steel shall be qualified as acceptable according to ASTM C 795. E. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process. F. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 1.3 REFERENCES A. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. 631 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 07 19 - 2 PLUMBING PIPING INSULATION B. ANSI/ASTM C533 - Calcium Silicate Block and Pipe Thermal Insulation. C. ANSI/ASTM C534 - Elastomeric Foam Insulation. D. ASTM C591 - Unfaced Preformed Rigid Cellular Polyisocyanurate Insulation. E. ASTM C1126 - Standard Specification for Faced or Unfaced Rigid Cellular Phenolic Thermal Insulation. F. ASTM C1729 - Standard Specification for Aluminum Jacketing for Insulation. G. ASTM C1767 - Standard Specification for Stainless Steel Jacketing for Insulation. H. ASTM E84 - Surface Burning Characteristics of Building Materials. I. NFPA 255 - Surface Burning Characteristics of Building Materials. J. UL 723 - Surface Burning Characteristics of Building Materials. K. National Commercial & Industrial Insulation Standards - 1999 Edition - as published by Midwest Insulation Contractors Association and endorsed by National Insulation Contractors Association. L. California Title 24 - Building Energy Efficiency Standards. 1.4 SUBMITTALS A. Submit shop drawings per Section 22 05 00. Include product description, list of materials and thickness for each service, and locations. PART 2 - PRODUCTS 2.1 INSULATION A. Type A: Glass fiber; ANSI/ASTM C547; 0.24 maximum 'K' value at 75°F; non- combustible. All-purpose polymer or polypropylene service jacket, listed and labeled at no more than 25/50 when tested per ASTM E84 or UL 723 as required by code. 2.2 VAPOR BARRIER JACKETS A. All-purpose polymer or polypropylene service jacket vapor barrier with self-sealing adhesive joints. Beach puncture resistance ratio of at least 50 units. Tensile strength: 35 psi minimum. Single, self-seal acrylic adhesive on longitudinal jacket laps and butt strips. B. Polyvinylidene Chloride (PVDC or Saran) film and tape: Durable and highly moisture and moisture vapor resistant. Please refer to manufacturer's recommended installation guidelines. 632 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 07 19 - 3 PLUMBING PIPING INSULATION 2.3 JACKET COVERINGS A. Aluminum Jackets: ASTM C1729; 0.016" thick (thicker where required by ASTM C1729); stucco embossed finish with Z edge seams and aluminum bands for outdoor use. Where colored jacket covers are called for, provide factory-applied hard film acrylic paint in color selected by Architect. PART 3 - EXECUTION 3.1 PREPARATION A. Install insulation after piping has been tested. Pipe shall be clean, dry and free of rust before applying insulation. 3.2 INSTALLATION A. General Installation Requirements: 1. Install materials per manufacturer's instructions, building codes and industry standards. 2. Continue insulation with vapor barrier through penetrations. This applies to all insulated piping. Maintain fire rating of all penetrations. B. Insulated Piping Operating Between 60°F and 140°F: 1. Do not insulate flanges and unions, but bevel and seal ends of insulation at such locations. Insulate all fittings, valves and strainers. C. Exposed Piping: 1. Locate and cover seams in least visible locations. 2. Where exposed insulated piping extends above the floor, provide a sheet metal guard around the insulation extending 12" above the floor. Guard shall be 0.016" cylindrical smooth or stucco aluminum and shall fit tightly to the insulation. 3.3 SUPPORT PROTECTION A. Provide a shield on all insulated piping at each support between the insulation jacket and the support. B. On all insulated piping greater than 1-1/2", provide shield with insulation insert of same thickness and contour as adjoining insulation at each support, between the pipe and insulation jacket, to prevent insulation from sagging and crushing. Inserts shall be as follows: 1. The insert shall be suitable for planned temperatures, be suitable for use with specific pipe material, and shall be a minimum 180° cylindrical segment the same length as metal shields. Inserts shall be: 633 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 07 19 - 4 PLUMBING PIPING INSULATION a. Molded hydrous calcium silicate (only use for pipes with operating temperatures above 90°F, with a minimum compressive strength of 100 psi is acceptable for pipe sizes 14" and below. For pipe sizes larger than 14", provide rolled steel plate in addition to the shield. b. As an alternative to separate pipe insulation insert and saddle, properly sized manufactured integral rigid insulation insert and shield assemblies may be used. 1) Products: a) Buckaroo CoolDry b) Cooper/B-Line Fig. B3380 through B3384 c) Pipe Shields A1000, A2000 c. Insulation Couplings: 1) Molded thermoplastic slip coupling, -65°F to 275°F, sizes up to 4-1/8" OD, and receive insulation thickness up to 1". Suitable for use indoors or outdoors with UV stabilizers. Vertical insulation riser clamps shall have a 1,000lb vertical load rating. On cold pipes operating below 60°F, cover joint and coupling with vapor barrier mastic to ensure continuous vapor barrier. 2) Horizontal Strut Mounted Insulated Pipe Manufacturers: a) Klo-Shure or equal 3) Vertical: a) Manufacturers: Klo-Shure Titan or equal d. Rectangular blocks, plugs, or wood material are not acceptable. e. Temporary wood blocking may be used by the Piping Contractor for proper height; however, these must be removed and replaced with proper inserts by the Insulation Contractor. Refer to Supports and Anchors specification section for additional information. C. Neatly finish insulation at supports, protrusions, and interruptions. D. Install metal shields between all hangers or supports and the pipe insulation. Shields shall be galvanized sheet metal, half-round with flared edges. Adhere shields to insulation. On cold piping, seal the shields vapor-tight to the insulation as required to maintain the vapor barrier, or add separate vapor barrier jacket. E. Shields shall be at least the following lengths and gauges: Pipe Size Shield Size 1/2" to 3-1/2" 12" long x 18 gauge 4" 12" long x 16 gauge 5” to 6" 18" long x 16 gauge 8” to 14" 24" long x 14 gauge 16” to 24" 24" long x 12 gauge 634 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 07 19 - 5 PLUMBING PIPING INSULATION F. Ferrous hot piping 4 inches and larger, provide steel saddle at rollers as described in Section 22 05 29 "Plumbing Supports and Anchors". G. Minimum 1/4" rolled galvanized steel plates shall be provided in addition to the sleeves as reinforcement on large pipes to reduce point loading on roller, trapeze hanger and strut support locations depending on insulation compressive strength. Refer to section above for exact locations. 3.4 INSULATION A. Type A Insulation: 1. All Service Jackets: Seal all longitudinal joints with self-seal laps using a single pressure sensitive adhesive system. Do not staple. 2. Insulation without self-seal lap may be used if installed with Benjamin Foster 85- 20 or equivalent Chicago Mastic, 3M or Childers lap adhesive. 3. Apply insulation with laps on top of pipe. 4. Fittings, Valve Bodies and Flanges: For 4" and smaller pipes, insulate with 1 lb. density insulation wrapped under compression to a thickness equal to the adjacent pipe insulation. For pipes over 4", use mitered segments of pipe insulation. Finish with preformed plastic fitting covers. Secure fitting covers with pressure sensitive tape at each end. Overlap tape at least 2" on itself. For pipes operating below 60°F seal fitting covers with vapor retarder mastic in addition to tape. B. Type B Insulation: 1. Install per manufacturer's instructions or ASTM C1710. 2. Elastomeric Cellular Foam: Where possible, slip insulation over the open end of pipe without slitting. Seal all butt ends, longitudinal seams, and fittings with adhesive. At elbows and tees, use mitered connections. Do not compress or crush insulation at cemented joints. Joints shall be sealed completely and not pucker or wrinkle. Paint the outside of outdoor insulation with two coats of latex enamel paint recommended by the manufacturer. 3. Insulation Installation on Straight Pipes and Tubes: a. Seal longitudinal seams and end joints with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated. b. Insulation must be installed in compression to allow for expansion and contraction. Insulation shall be pushed onto the pipe, never pulled. Stretching of insulation may result in open seams and joints. 4. Insulation Installation on Valves and Pipe Specialties: a. Install preformed sections of same material as straight segments of pipe insulation when available. b. When preformed sections are not available, install mitered sections of pipe insulation to valve body. c. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation. 635 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 07 19 - 6 PLUMBING PIPING INSULATION 3.5 JACKET COVER INSTALLATION A. Metal Covering: 1. Provide vapor barrier as specified for insulation type. Cover with aluminum jacket covering with seams located on the bottom of horizontal piping. Include fittings, joints and valves. 2. Seal all interior and exterior butt joints with metal draw bands and sealant. Seal all exterior joints watertight. 3. Interior joints do not need to be sealed. 4. Use metal covering on the following pipes: a. All exterior piping. b. Cover insulation with aluminum jacketing. END OF SECTION 22 07 19 636 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 09 00 - 1 INSTRUMENTATION SECTION 22 09 00 INSTRUMENTATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pressure Gauge. B. Pressure Gauge Accessories. C. Thermometers. D. Test Plugs. 1.2 REFERENCES A. ANSI/AWWA C700 - Cold Water Meters - Displacement Type, Bronze Main Case. B. ANSI/AWWA C701 - Cold Water Meters - Turbine Type, for Customer Service. C. ANSI/AWWA C702 - Cold Water Meters - Compound Type. D. ANSI/AWWA C706 - Direct Reading, Remote Registration Systems for Cold Water Meters. E. ASME B40.1 - Gauges - Pressure Indicating Dial Type - Elastic Element. F. ASME MFC-3M - Measurement of Fluid Flow in Pipes Using Orifice, Nozzle and Venturi. G. ASTM E1 - Specification for ASTM Thermometers. 1.3 SUBMITTALS A. Submit shop drawings per Section 22 05 00. Include list that indicates use, operating range, total range and location for manufactured components. PART 2 - PRODUCTS 2.1 PRESSURE GAUGES A. Gauges shall be 4-1/2" diameter with aluminum or stainless steel case with phosphor bronze bourdon tube, brass socket for water or oil application, 1/4" or 1/2" bottom connection. Gauges shall be 1% full scale accurate with bronze bushed brass movement and adjustable pointer. Standard ranges to be either pressure or pressure and vacuum as required of application. 637 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 09 00 - 2 INSTRUMENTATION 1. Manufacturers: a. Trerice b. Weiss c. Weksler B. Select gauge range for normal reading near center of gauge. 2.2 PRESSURE GAUGE ACCESSORIES A. All pressure gauges shall have valves and pressure snubbers. All pressure gauges on steam shall have pigtail syphon. B. Shutoff Valve: 1/4" ball valve as specified for each piping system. 2.3 THERMOMETERS A. Dial Type: 1. 4-1/2" diameter, hermetically sealed case. Stainless steel case and stem. Accuracy of 1% full scale with external recalibrator. 2. Select thermometers for appropriate temperature range. Adjustable elbow joint with locking device to allow rotation of thermometer to any angle. 3. Stem lengths as required for application with minimum insertion of 2-1/2". 4. Thermometers for water shall have brass or steel separable socket. Thermometer wells shall be stainless steel, pressure rated to match piping system design pressure; with 2-inch extension for insulated piping and threaded cap nut with chain permanently fastened to well and cap. 5. Manufacturer: a. Trerice b. Weiss c. Weksler B. Select scales to cover expected range of temperatures. 2.4 TEST PLUGS A. Test Plug: 1/4" or 1/2" brass fitting and cap, with Nordel core for temperatures up to 275°F , for receiving 1/8" outside diameter pressure or temperature probe. Plugs shall be rated for zero leakage from vacuum to 500 psi. B. Provide extended units for all plugs installed in insulated piping. C. Test Kit: Carrying case, internally padded and fitted containing one 3-1/2" diameter pressure gauge with 0-100 psi range, one gauge adapter with 1/8" probes, two 1-1/2" dial thermometers with 0° to 220°F and -25°F to 125°F ranges and 5" stems. D. Manufacturers: 1. Peterson Equipment 2. Trerice 638 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 09 00 - 3 INSTRUMENTATION 3. Watts Regulator. PART 3 - EXECUTION 3.1 INSTALLATION A. General Installation Requirements: 1. Install per manufacturer's instructions. 2. Coil and conceal excess capillary on remote element instruments. 3. Install gauges and thermometers in locations where they are easily read from normal operating level. 4. Do not install instrumentation when areas are under construction, except for required rough-in, taps, supports and test plugs. B. Pressure Gauges: 1. Connect pressure gauges to suction and discharge side of all pumps. 2. Provide snubber for each pressure gauge. 3. Provide coil syphon for each pressure gauge connected to steam piping. C. Thermometers: 1. Install piping system thermometers in sockets with short couplings. Enlarge pipes smaller than 2-1/2" for installation of thermometer sockets. 2. Install thermometer sockets adjacent to control system thermostat, transmitter and sensor sockets. END OF SECTION 22 09 00 639 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 1 PLUMBING PIPING SECTION 22 10 00 PLUMBING PIPING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Valves. C. Check Valves. 1.2 QUALITY ASSURANCE A. Valves: Manufacturer's name and pressure rating marked on valve body. Remanufactured valves are not acceptable. B. Welding Materials and Procedures: Conform to ASME Code and applicable state labor regulations. C. Welders Certification: In accordance with ANSI/ASME Sec 9 or ANSI/AWS D1.1. D. Piping, Fittings, Valves, and Flux for Potable Water Systems: All components shall be lead free per Federal Act S.3874, Reduction of Lead in Drinking Water Act. E. Pipe hangers and supports shall be spaced per 2019 CPC, Table 313.3, as applied to each pipe system listed. Refer to Section 22 05 29 for hanger and support components. Seismic supports shall be submitted as a deferred approval using OPM guidelines. Shop drawings shall be submitted for review to the AHJ: State, local or agency reviewing the project. Upon approval, these shop drawings shall be included in the record set. F. Potable water piping and fittings shall comply with California Assembly Bill AB1953 limiting lead content. Also described in 2019 CPC: 604.2 Lead Content. G. Valves for potable water systems shall comply with California Assembly Bill AB1953 limiting lead content. Also described in 2019 CPC: 604.2 Lead Content. 1.3 REFERENCES A. ANSI/ASME A112.3.1 - Stainless Steel Drainage Systems for Sanitary DWV, Storm, and Vacuum Applications, Above and Below Ground. B. ASME A112.6.9 - Siphonic Drain Test; The American Society of Mechanical Engineers. C. ANSI/ASME B16.22 - Wrought Copper and Bronze Solder-Joint Pressure Fittings. 640 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 2 PLUMBING PIPING D. ANSI/ASME B16.23 - Cast Copper Alloy Solder Joint Drainage Fittings - DWV. E. ANSI/ASME B16.29 - Wrought Copper and Wrought Copper Alloy Solder Joint Drainage Fittings - DWV. F. ANSI/ASME B16.3 - Malleable Iron Threaded Fittings Class 150 NS 300. G. ANSI/ASME B16.5 - Pipe Flanges and Flanged Fittings. H. ANSI/ASME B16.9 - Factory-Made Wrought Steel Butt Welding Fittings. I. ANSI/ASME B31.3 - Chemical Plant and Petroleum Refinery Piping. J. ANSI/ASME Sec 9 - Welding and Brazing Qualifications. K. ANSI/ASTM B32 - Solder Metal. L. ANSI/AWS D1.1 - Structural Welding Code. M. ANSI/AWWA C110 - Ductile Iron and Gray Iron Fittings 3" through 48", for Water and Other Liquids. N. ANSI/AWWA C111 - Rubber-Gasket Joints for Ductile Iron and Gray Iron Pressure Pipe and Fittings. O. ANSI/AWWA C151 - Ductile Iron Pipe, Centrifugally Cast in Metal Molds or Sand- Lined Molds, for Water or Other Liquids. P. ANSI/AWWA C153 - Compact Ductile Iron Fittings 3" through 48", for Water and Other Liquids. Q. ASSE 1003 - Water Pressure Reducing Valves for Domestic Water Supply Systems. R. ASTM A53 - Pipe, Steel, Black and Hot-Dipped Zinc Coated, Welded and Seamless. S. ASTM A74 - Hub and Spigot Cast Iron Soil Pipe and Fittings. T. ASTM A234 - Pipe Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and Elevated Temperatures. U. ASTM A312 - Standard for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes. V. ASTM A888 - Hubless Cast Iron Soil Pipe and Fittings. W. ASTM B88 - Seamless Copper Water Tube. X. ASTM B306 - Copper Drainage Tube (DWV). Y. ASTM C564 - Rubber Gaskets for Cast Iron Soil Pipe and Fittings. Z. ASTM C1540 - Shielded Couplings Joining Hubless Cast Iron Soil Pipe and Fittings. 641 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 3 PLUMBING PIPING AA. ASTM D2321 - Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications. BB. ASTM F402 - Standard Practice for Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings. CC. AWS A5.8 - Brazed Filler Metal. DD. AWWA C651 - Disinfecting Water Mains. EE. CISPI 301 - Cast Iron Soil Pipe and Fittings for Hubless Cast Iron Sanitary Systems. FF. CISPI 310 - Joints for Hubless Cast Iron Sanitary Systems. GG. FM 1680 - Couplings Used in Hubless Cast Iron Systems. HH. NFPA 24 - Private Fire Service Mains and Their Appurtenances. II. NFPA 54 - National Fuel Gas Code. JJ. NFPA 58 - Storage and Handling of Liquefied Petroleum Gases. KK. NSF - National Sanitation Foundation LL. CCR - California Code of Regulation MM. CBC - California Building Code NN. CPC - California Plumbing Code 1.4 SUBMITTALS A. Submit shop drawings per Section 22 05 00. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver and store valves in shipping containers with labeling in place. 1.6 COORDINATION DRAWINGS A. Reference Coordination Drawings article in Section 22 05 00 for required plumbing systems electronic CAD drawings to be provided to Coordinating Contractor for inclusion into composite coordination drawings. PART 2 - PRODUCTS 2.1 CAST IRON PIPE A. Cast Iron; Standard Weight; Hub and Spigot Joints: 1. Pipe: Standard weight hub and spigot cast iron soil pipe, corrosion protective coating inside and outside, CISPI 301 or ASTM A888. 2. Design Pressure: Gravity Maximum Design Temperature: 180°F 642 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 4 PLUMBING PIPING 3. Joints: Compression gasket, ASTM C564. 4. Restraints: Install pipe and fittings per the Cast Iron Soil Pipe Institute's Designation 301. Restrain pipe and fittings using an engineered and tested product manufactured for restraining no-hub cast iron soil pipe. Install per manufacturer's recommendations. 5. Adapters: Heavy duty no-hub transition for joining cast iron and PVC pipe. Adapters shall be tested and certified to ASTM C 1460 and be constructed with Type 304 stainless steel shield, thickness 0.015" shield, gasket material to meet ASTM C564, 1-1/2" to 4" will be 3" wide with four 304 stainless steel bands, and 6" to 10" will be 4" wide with six 304 stainless steel bands and 3/8" 305 stainless steel hex head screws torqued to 80 inch pounds. B. Cast Iron; Standard Weight; No-Hub Sleeve Gaskets: 1. Pipe: Standard weight no-hub cast iron soil pipe, corrosion protective coating inside and outside, CISPI 301 or ASTM A888. 2. Design Pressure: Gravity Maximum Design Temperature: 180°F 3. Joints: Heavy duty, neoprene sleeve gasket, ASTM C-564, 300 Series stainless steel shield, clamp, and screws with at least four screw type clamps, FM 1680 or ASTM C1540. 4. Restraints: Install pipe and fittings per the Cast Iron Soil Pipe Institute's Designation 310. Restrain pipe and fittings using an engineered and tested product manufactured for restraining no-hub cast iron soil pipe. Install per manufacturer's recommendations. 5. Adapters: Transitions from cast iron soil pipe to other pipe materials with manufactured adapters. Heavy duty neoprene sleeve gasket, ASTM C-564, 300 Series stainless steel shield, clamp, and screws with not less than four screw type clamps, FM 1680 or ASTM C1540. 2.2 COPPER PIPE A. Copper Pipe; Type L; Solder Joints: 1. Pipe: Type L hard drawn seamless copper tube, ASTM B88. 2. Design Pressure: 175 psi; Maximum Design Temperature: 200°F. 3. Joints: Solder with 100% lead-free solder and flux, ASTM B32. 4. Fittings: Wrought copper solder joint, ANSI B16.22. B. Copper Pipe; Type L; Mechanical Press Connection: 1. Pipe: Type L hard drawn seamless copper tube, ASTM B88. 2. Design Pressure: 175 psi; Maximum Design Temperature: 200°F. 3. Joints: Mechanical press connection. 4. Fittings: Copper, ANSI B-16.22, with embedded EPDM O-ring, NSF-61. 5. Manufacturers: a. Viega ProPress b. Nibco Press System Fittings and Valves c. Mueller Streamline PRS 643 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 5 PLUMBING PIPING C. Copper Pipe; Type K; Solder Joints: 1. Pipe: Type K annealed copper tube, ASTM B88. 2. Design Pressure: 150 psi. Maximum Design Temperature: 200°F. 3. Joints: Solder with 100% lead-free solder and flux ASTM B32. 4. Fittings: Wrought copper solder joint, ANSI B16.22. D. Copper Pipe: Type DWV; Solder Joints: 1. Pipe: Type DWV hard temper seamless copper drainage tube, ASTM B306. 2. Design Pressure: Gravity Maximum Design Temperature: 180°F 3. Joints: Solder with 100% lead-free solder and flux, ASTM B32. 4. Fittings: Cast brass solder joint drainage type, ANSI B16.23 or wrought copper solder joint drainage type, ANSI B16.29. E. Copper Pipe: Type M; Solder Joints: 1. Pipe: Type M hard temper seamless copper drainage tube, ASTM B306. 2. Design Pressure: Gravity Maximum Design Temperature: 180°F 3. Joints: Solder with 100% lead-free solder and flux, ASTM B32. 4. Fittings: Cast brass solder joint drainage type, ANSI B16.23 or wrought copper solder joint drainage type, ANSI B16.29. 2.3 VALVES A. Shutoff Valves: 1. For pipe systems where mechanical press connections are allowed, shutoff valves with mechanical press connections are acceptable subject to the requirements in the paragraphs below. B. Throttling Valves 1. Globe Valves: a. GL-1: 2" and under, 150# saturated steam, 300# CWP, screwed, bronze. Crane #7TF, Stockham #B22T, Walworth #3095, Milwaukee #590, Hammond #IB413T, Watts #B-4010-T, Nibco T-235Y. 2. Plug Valves: a. PL-1: 2" and under, 125# steam @ 450°F, 175# CWP @ 180°F, cast iron body, screwed, full port. Walworth #1700, DeZurik #425, S-RS49. 2.4 STRAINERS A. For pipe systems where mechanical press connections are allowed, strainers with mechanical press connections are acceptable subject to the requirements in the paragraphs below. 644 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 6 PLUMBING PIPING B. ST-1: Bronze body, screwed ends, screwed cover, 150 psi S @ 350°F, 200 psi CWP @ 150°F. Armstrong #F4SC, Metraflex #TS, Mueller Steam Specialty Co. #351, Sarco #BT, Watts #777. 2.5 CHECK VALVES A. For pipe systems where mechanical press connections are allowed, check valves with mechanical press connections are acceptable subject to the requirements in the paragraphs below. B. CK-1: 2" and under, 125# steam @ 406°F, 200# CWP @ 150°F, screwed, bronze, horizontal swing. Crane #37, Hammond #IB904, Stockham #B319-Y, Walworth #3406, Milwaukee #509, Watts #G-5000, Nibco T-413B. 2.6 VALVE BOX/CURB BOX A. VB-1: 2" and under, extension type curb box with arch pattern base and sufficient length to allow top to terminate flush with finished grade. Cast iron lid with integrally cast brass bushing and marked "water" in integrally cast raised letters. Furnished with valve operating wrench of sufficient length to extend 3' above finished grade when engaged with valve. Construction of curb box shall meet all local codes and requirements. Mueller H-10000 Series, A.Y. McDonald 5600 Series, Tyler Pipe 6500 Series. 2.7 LOCK OUT TRIM A. Provide lock out trim for all quarter turn shutoff valves opening to atmosphere and installed in domestic water piping over 120°F and as indicated on the drawings. 2.8 VALVE OPERATORS A. Provide handwheels for gate valves and gear operators for butterfly valves. 2.9 VALVE CONNECTIONS A. Provide all connections to match pipe joints. Valves shall be same size as pipe unless noted otherwise. 2.10 CONNECTIONS BETWEEN DISSIMILAR METALS A. Connections between dissimilar metals shall be insulating dielectric types that provide a water gap between the connected metals, and that either allow no metal path for electron transfer or that provide a wide water gap lined with a non-conductive material to impede electron transfer through the water path. B. Joints shall be rated for the temperature, pressure, and other characteristics of the service in which they are used, including testing procedure. C. Aluminum, iron, steel, brass, copper, bronze, galvanized steel and stainless steel are commonly used and require isolation from each other with the following exceptions: 1. Iron and steel connected to each other. 645 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 7 PLUMBING PIPING 2. Brass, copper, and bronze connected to each other. 3. Brass or bronze valves and specialties connected in closed systems with steel, iron, or stainless steel on both sides of the brass or bronze valves and specialties. Where two or more brass or bronze items occur together, they shall be connected with brass nipples. Brass or bronze valves and specialties cannot be used as a dielectric separation between pipe materials. D. Dielectric protection is required at connections to equipment of a material different than the piping. E. Screwed Joints (acceptable up to 2" size): 1. Dielectric waterway rated for 300 psi CWP and 225°F. 2. Manufacturers: a. Victaulic Series 647 b. Grinnell Series 407 F. Flanged Joints (any size): 1. Use 1/8" minimum thickness, non-conductive, full-face gaskets. 2. Employ one-piece molded sleeve-washer combinations to break the electrical path through the bolts. 3. Sleeve-washers are required on one side only, with sleeves minimum 1/32" thick and washers minimum 1/8" thick. 4. Install steel washers on both sides of flanges to prevent damage to the sleeve- washer. 5. Separate sleeves and washers may be used only if the sleeves are manufactured to exact lengths and installed carefully so the sleeves must extend partially past each steel washer when tightened. 6. Manufacturers: a. EPCO b. Central Plastics c. Pipeline Seal and Insulator d. F. H. Maloney e. Calpico PART 3 - EXECUTION 3.1 PREPARATION A. Install all products per manufacturer's recommendations. B. Ream pipe and tube ends. Remove burrs. Bevel plain end ferrous pipe. C. Remove scale and dirt, on inside and outside, before assembly. D. Remove all scale, rust, dirt, oils, stickers and thoroughly clean exterior of all bare metal exposed piping, hangers, and accessories in preparation to be painted. 646 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 8 PLUMBING PIPING E. Connect to equipment with flanges or unions. F. Use only piping materials rated for the maximum temperature of the application, e.g., do not use PVC for dishwasher drainage or piping that receives boiler blowdown. G. Roof Penetration (Vent) Flashing: 1. Built-up Roofing: Flash vents with 3# seamless sheet lead of sufficient size to extend 15" into roofing felts for built-up roofs. 2. Membrane: Flash vents with premolded pipe flashing cones for single-ply membrane roofs, metal roofs, or shingled roofs. H. Existing building sewers or building drains which are shown on the documents to be reused shall be inspected and recorded by closed circuit television for their condition. Report findings back to the Architect, Engineer, and Owner before proceeding with work so any necessary rework can take place if needed. 3.2 SYSTEM, PIPING AND VALVE SCHEDULE A. Cold Water, Hot Water, Tempered Water - Potable and Non-Potable (Above Ground): 1. Copper Pipe; Type L; Solder Joints: All Sizes 2. Copper Pipe; Type L; Mechanical Press Connection: 4" and Under 3. Shutoff Valves:, BA-1 4. Throttling Valves: GL-1 5. Check Valves: CK-1 6. Strainers: ST-1 B. Cold Water, Hot Water, Tempered Water - Potable and Non-Potable (Underground): 1. Copper Pipe; Type K; Solder Joints: All Sizes C. Combination Water and Fire Protection Service: 1. Copper Pipe; Type K; Solder Joints: 2" and under 2. Shutoff Valves: 3. Valve Box: VB-1 D. Shutoff Valves: BA-1, BA-1ASanitary Waste and Vent, Gravity (Above Ground): 1. Cast Iron; Standard Weight; Hub and Spigot Joints: All Sizes 2. Cast Iron; Standard Weight; No-Hub Sleeve Gaskets: 1-1/2" to 15" 3. Copper Pipe: Type DWV; Solder Joints: 1-1/4" to 4" E. Sanitary Indirect Drainage (Above Ground): 1. Copper Pipe: Type DWV; Solder Joints: 1-1/4" to 4" 2. Copper Pipe: Type M; Solder Joints: 1-1/4" to 4" F. Storm Drainage, Gravity (Above Ground): 1. Cast Iron; Standard Weight; No-Hub Sleeve Gaskets: 1-1/2" to 15" 647 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 9 PLUMBING PIPING G. Sanitary Waste and Vent, Gravity (Underground - Inside Building): 1. Cast Iron; Standard Weight; Hub and Spigot Joints: All Sizes 2. Cast Iron; Standard Weight; No-Hub Sleeve Gaskets: 1-1/2" to 15" H. Storm Drainage, Gravity (Underground - Inside Building): 1. Cast Iron; Standard Weight; Hub and Spigot Joints: All Sizes 2. Cast Iron; Standard Weight; No-Hub Sleeve Gaskets: 1-1/2" to 15" I. Sanitary Waste and Vent, Gravity (Underground - Outside Building): 1. Cast Iron; Standard Weight; Hub and Spigot Joints: All Sizes J. Storm Drainage, Gravity (Underground - Outside Building): 1. Cast Iron; Standard Weight; Hub and Spigot Joints: All Sizes 3.3 TESTING PIPING A. Sanitary Drainage: 1. Test all piping with water to prove tight. 2. Test piping before insulation is applied. 3. Hydrostatically test all soil, waste, and vent piping inside of building with 10 feet head of water for 15 minutes. Inspect before fixtures are connected. If leaks appear, repair them and repeat the test. 4. Hydrostatically test interior downspouts with 10 feet head of water for 15 minutes with no leaks. 5. A smoke/air test at the same pressure may be used in lieu of the hydrostatic water test. Exception: Smoke/air test shall not be performed on plastic piping. 6. Test force mains with water at 105% of the operating pump discharge pressure for 15 minutes. 7. Test pressures stated above shall be as listed or as required by the Authority Having Jurisdiction, whichever is most stringent. 8. Test piping per CPC requirements. B. Hot Water - Potable and Non-Potable, Cold Water - Potable and Non-Potable: 1. Test pipes underground or in chases and walls before piping is concealed. 2. Test all pipes before the insulation is applied. If insulation is applied before the pipe is tested and a leak develops which ruins the insulation, replace damaged insulation. 3. Test the pipe with 100 psig water pressure or equal inert gas such as nitrogen. Exception: Inert gas test shall not be used to test plastic piping. 4. Hold test pressure for at least 2 hours. 5. Test to be witnessed by the Architect/Engineer's representative, if requested by the Architect/Engineer. 648 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 10 PLUMBING PIPING C. Fire Service: 1. Hydrostatically test the entire system for two hours at 200 psig. Maximum leakage shall be: a. Interior Piping: 0 quarts per hour. b. Underground Piping: 2 quarts per 100 joints per hour. D. All Other Piping: 1. Test piping at 150% of normal operating pressure. 2. Piping shall hold this pressure for one hour with no drop in pressure. 3. Test piping using water, nitrogen, or air as compatible with the final service of the pipe. Do not use combustible fluids. 4. Drain and clean all piping after testing is complete. 3.4 CLEANING PIPING A. Assembly: 1. Before assembling pipe systems, remove all loose dirt, scale, oil and other foreign matter on internal or external surfaces by means consistent with good piping practice subject to approval of the Architect/Engineer's representative. Blow chips and burrs from machinery or thread cutting operation out of pipe before assembly. Wipe cutting oil from internal and external surfaces. 2. During fabrication and assembly, remove slag and weld spatter from both internal and external joints by peening, chipping and wire brushing. 3. Notify the Architect/Engineer's representative before starting any post erection cleaning in sufficient time to allow witnessing the operation. Consult with and obtain approval from the Architect/Engineer's representative regarding specific procedures and scheduling. Dispose of cleaning and flushing fluids properly. 4. Prior to blowing or flushing erected piping systems, disconnect all instrumentation and equipment, open wide all valves, and be certain all strainer screens are in place. B. Air Blow: 1. Blow out pipe and components with clean compressed air. Instrument air, argon, nitrogen and sulfuric acid lines shall be blown out with dry, oil free air or nitrogen gas. "Oil Free" is defined as air compressed in a centrifugal, Teflon ring, carbon ring or water pumped air compressor. Where air supply is judged to be inadequate to continually attain cleaning velocity, alternate pressurization and sudden relief procedure may be used until discharge at all blow out points is clean. Use 80-90 psig pressure unless otherwise indicated. 2. Air blow applies to the following systems: a. Acetylene b. Carbon Dioxide c. Nitrogen (use oil free air or nitrogen gas) d. Argon (use oil free air or nitrogen gas) e. Instrument Air (use oil free air or nitrogen gas) f. Distilled Water (use maximum of 50 psig pressure) 649 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 11 PLUMBING PIPING g. Chemical Feed h. Air Compressor Intakes i. Sulfuric Acid (use oil free air or nitrogen gas) C. All Water Piping: 1. Flush all piping using faucets, flush valves, etc. until the flow is clean. 2. After flushing, thoroughly clean all inlet strainers, aerators, and other such devices. 3. If necessary, remove valves to clean out all foreign material. D. Fire Service: 1. Flush all underground piping with minimum flow equal to the system design flow but not less than the following: a. 390 gpm for 4" pipes. b. 880 gpm for 6" pipes. c. 1560 gpm for 8" pipes. d. 2440 gpm for 10" pipes. e. 3500 gpm for 12" pipes. 3.5 INSTALLATION A. General Installation Requirements: 1. Provide dielectric connections between dissimilar metals. 2. Route piping in orderly manner and maintain gradient. Install to conserve building space. 3. Group piping whenever practical at common elevations. 4. Install piping to allow for expansion and contraction without stressing pipe, joints, or equipment. 5. Slope water piping and arrange to drain at low points. 6. Install bell and spigot piping with bells upstream. 7. Where pipe supports are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welds. 8. Seal pipes passing through exterior walls with a wall seal per Section 22 05 29. Provide Schedule 40 galvanized sleeve at least 2 pipe sizes larger than the pipe. 9. All non-potable outlets shall be clearly marked with a permanently affixed laminated sign with 3/8" high lettering saying "Non-Potable Water Not for Human Consumption." Sign shall have black lettering on a yellow background. 10. All vertical pipe drops to sinks or other equipment installed below the ceiling shall be routed within a wall cavity, unless specifically noted otherwise to be surface mounted. For renovation projects, this Contractor is responsible for opening and patching existing walls for installation of piping. Wall patching shall match existing condition. B. Installation Requirements in Electrical Rooms: 1. Do not install piping or other equipment above electrical switchboards or panelboards. This includes a dedicated space extending 25 feet from the floor to the structural ceiling with width and depth equal to the equipment. 650 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 12 PLUMBING PIPING C. Valves/Fittings and Accessories: 1. Install shutoff valves that permit the isolation of equipment/fixtures in each room without isolating any other room or portion of the building. Individual fixture angle stops do not meet this requirement. Exception: Back-to-back rooms in no more than two adjacent rooms. 2. Provide clearance for installation of insulation and access to valves and fittings. 3. Provide access doors for concealed valves and fittings. 4. Install valve stems upright or horizontal, not inverted. 5. Provide one plug valve wrench for every ten plug valves 2" and smaller, minimum of one. Provide each plug valve 2-1/2" and larger with a wrench with set screw. 6. Install corrugated, stainless steel tubing system according to manufacturer's written instructions. Include striker plates to protect tubing from puncture where tubing is restrained and cannot move. D. Underground Piping: 1. Install buried water piping outside the building with at least 5 feet of cover.Refer to Section 22 05 00 for Excavation, Fill, Backfill and Compaction requirements 2. Direct buried, uninsulated steel pipe shall have a factory applied external protective coating consisting of two coats with an intermediate layer of 18 mil fibrous glass mat. Coating thickness shall total not less than 3/32". The outer coating shall be further protected by a wrapping of heavy Kraft paper. This external protection shall extend and be exposed for a minimum of 1 foot beyond the buried or concealed portion of the pipe. a. Manufacturers: 1) Pipe Line Service Co., Franklin Park, Illinois 2) Lithcote Corp., Melrose Park, Illinois 3. As an option, the Contractor may provide factory applied protective coatings consisting of a polyethylene plastic film bonded to the pipe surface by a hot applied thermo-plastic adhesive. a. Manufacturers: 1) Republic Steel Corp. "X-Tru-Coat" 4. Exercise care in handling, storing and laying pipe to avoid damaging factory applied coatings. If any damage occurs, repair the coating to a condition equal to the original. 5. Field application of protective coatings to joints, fittings and to any damaged factory applied coatings shall be similar to factory applied coatings specified above and shall be done in strict accordance with recommendations of the supplier of pipe coatings. 6. After completion of the fabrication, laying and field coating of the joints and fittings, but prior to backfilling, inspect the entire line in the presence of the Architect/Engineer's representative with an electronic holiday detector. Any defects in the protective coatings shall be repaired in accordance with requirements for original coatings. 7. Coat flange bolts and nuts in pits and below ground at the time of installation with a corrosion protective coating. 651 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 13 PLUMBING PIPING E. Sanitary and Storm Piping: 1. Install all sanitary and storm piping inside the building with a slope as shown on the drawings. 2. Install horizontal offset at all connections to roof drains to allow for pipe expansion. 3. Sway Bracing: Where horizontal sanitary and/or storm pipes 4 inches and larger change flow direction greater than 45°, rigid bracing or thrust restraints shall be installed to resist movement of the upstream pipe in the direction of pipe flow. The rigid bracing or thrust restraint shall be connected to structure. A change of flow direction from horizontal into a vertical pipe does not require the upstream pipe to be braced. 4. Starter fittings with internal baffles are not permitted. 3.6 PIPE ERECTION AND LAYING A. Carefully inspect all pipe, fittings, valves, equipment and accessories before installation. Any items that are unsuitable, cracked or otherwise defective shall be removed from the job immediately. B. All pipe, fittings, valves, equipment and accessories shall have factory applied markings, stampings, or nameplates with sufficient data to determine their conformance with specified requirements. C. Exercise care at every stage of storage, handling, laying and erecting to prevent entry of foreign matter into piping, fittings, valves, equipment and accessories. Do not install any item that is not clean. D. Until system is fully operational, all openings in piping and equipment shall be kept closed except when actual work is being performed on that item or system. Closures shall be plugs, caps, blind flanges or other items specifically designed and intended for this purpose. E. Run pipes straight and true, parallel to building lines with minimum use of offsets and couplings. Provide only offsets required to provide needed headroom or clearance and to provide needed flexibility in pipe lines. F. Make changes in direction of pipes only with fittings or pipe bends. Changes in size only with fittings. Do not use miter fittings, face or flush bushings, or street elbows. All fittings shall be of the long radius type, unless otherwise shown on the drawings or specified. G. Provide flanges or unions at all final connections to equipment, traps and valves. H. Arrange piping and connections so equipment served may be totally removed without disturbing piping beyond final connections and associated shutoff valves. I. Use full and double lengths of pipe wherever possible. J. Unless otherwise indicated, install all piping, including shutoff valves and strainers, to coils, pumps and other equipment at line size with reduction in size being made only at control valve or equipment. 652 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 14 PLUMBING PIPING K. Cut all pipe to exact measurement and install without springing or forcing except in the case of expansion loops where cold springing is indicated on the drawings. L. Underground pipe shall be laid in dry trenches maintained free of accumulated water. Refer to Section 22 05 00 for Excavation, Fill, Backfill and Compaction requirements. M. Unless otherwise indicated, branch take-offs shall be from top of mains or headers at either a 45° or 90° angle from the horizontal plane for air lines, and from top, bottom or side for liquids. N. Do not use geotextile fabric with footing tile if silt content of soil exceeds 40% or if clay content exceeds 50%. The fabric shall be installed around 1" river rock or 2" limestone. 3.7 DRAINING AND VENTING A. Unless otherwise indicated on the drawings, all horizontal water lines, including branches, shall pitch 1" in 40 feet to low points for complete drainage, removal of condensate and venting. B. Maintain accurate grade where pipes pitch or slope for venting and drainage. No pipes shall have pockets due to changes in elevation. C. Provide drain valves at all low points of water piping systems for complete or sectionalized draining. D. Use eccentric reducing fittings on horizontal runs when changing size of pipes for proper drainage and venting. Install gravity drain pipes with bottom of pipe and eccentric reducers in a continuous line; all other liquid lines with top of pipe and eccentric reducers in a continuous line. E. Provide air vents at high points and wherever else required to eliminate air in all water piping systems. F. Install air vents in accessible locations. If necessary to trap and vent air in a remote location, install an 1/8" pipe from the tapping location to an accessible location and terminate with a venting device. G. All vent and drain piping shall be of same materials and construction for the service involved. 3.8 PLUMBING VENTS A. Vent as shown on the drawings and in accordance with all codes having jurisdiction. B. Extend the high side of the soil and waste stacks at least 12" above roof. C. Flash pipes at the roof with 3# lead sheet. Extend flashing under roofing 15" in all directions from pipe to be flashed. Extend a lead collar up on the outside of pipe to be flashed and extend 1" beyond the top of the pipe. The 1" excess length of collar shall be turned down into the top of the pipe where it shall fit tight to the inside of the pipe. 653 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 15 PLUMBING PIPING D. Flash pipes at roof with premolded EPDM pipe flashing cones adhered to roof membrane by General Contractor. Secure top of cone with stainless steel clamp and seal watertight. E. Increase vent pipes through the roof two pipe sizes with long increasers located at least 12" below the roof. F. In no case shall the vent through the roof be less than 4" in diameter. G. Vent pipes through the roof shall be located a minimum of 10 feet from any air intake opening on the roof. 3.9 BRANCH CONNECTIONS A. For domestic water and vent systems only, make branch connections with standard tee or cross fittings of the type required for the service. B. Reducers are generally not shown. Where pipe sizes change at tee, the tee shall be the size of the largest pipe shown connecting to it. C. Do not use double wye or double combination wye and eighth bend DWV fittings in horizontal piping. D. Branch connections from the headers and mains may be mechanically formed using an extraction device. The branch piping connection shall be brazed connection for the following services only: 1. Domestic water piping above ground. E. Further limit use of mechanically formed fittings as follows: 1. Must have at least same pressure rating as the main. 2. Main must be Type K or L copper tubing. 3. Permanent marking shall indicate insertion depth and orientation. 4. Branch pipe shall conform to the inner curve of the piping main. 5. Main must be 1" or larger. 6. Branch must be 3/4" or larger. F. Branch connections from headers and mains may be cut into black steel pipe using forged weld-on fittings. G. Forged weld-on fittings are limited as follows: 1. Must have at least same pressure rating as the main. 2. Main must be 2-1/2" or larger. 3. Branch line is at least two pipe sizes under main size. 654 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 16 PLUMBING PIPING 3.10 JOINING OF PIPE A. Solder Joints (Copper Pipe): 1. Make up joints with 100% lead-free solder, ASTM B32. Cut tubing so ends are perfectly square and remove all burrs inside and outside. Thoroughly clean sockets of fittings and ends of tubing to remove all oxide, dirt and grease just prior to soldering. Apply flux evenly, but sparingly, over all surfaces to be joined. Heat joints uniformly so solder will flow to all mated surfaces. Wipe excess solder, leaving a uniform fillet around cup of fitting. 2. Flux shall be non-acid type. 3. Solder end valves may be installed directly in the piping system if the entire valve is suitable for use with 470°F melting point solder. Remove discs and seals during soldering if they are not suitable for 470°F. B. Mechanical Press Connection (Copper and Stainless Steel Pipe): 1. Copper press fitting shall be made in accordance with the manufacturer's installation instructions. 2. Fully insert tubing into the fitting and mark tubing. 3. Prior to making connection, the fitting alignment shall be checked against the mark made on the tube to ensure the tubing is fully engaged in the fitting. 4. Joint shall be pressed with a tool approved by the manufacturer. 5. Installers shall be trained by manufacturer personnel or representative. Provide documentation upon request. C. Hub and Spigot Joints - Sanitary Pipe and Storm Pipe (Cast Iron and Stainless Steel Pipe): 1. Lead and Oakum Joints: Pack joint with oakum made of vegetable fiber, cotton, or hemp. Pour joint with molten lead up to top of hub. Ensure leak-free joints by working joint with inside and outside caulking irons. 2. Compression Gasket Joints: Joint shall be one-piece double seal compression type gasket made specifically for joining cast iron soil pipe. Gasket shall be neoprene, permitting joint to flex as much as 5 degrees without loss of seal. Gasket shall be extra heavy weight class, conforming to ASTM C-564. D. No-Hub Sleeve Gaskets (No-Hub) (Cast Iron Pipe): 1. Gasket shall be heavy weight class, conforming to ASTM C564. 2. The gasket shall have an internal center stop. 3. The gasket shall be covered by a stainless steel band secured with a minimum of four stainless steel bands per fitting/joint. 4. Sleeve gaskets shall be installed in accordance with the manufacturer's installation instructions. 655 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 00 - 17 PLUMBING PIPING 3.11 DISINFECTION OF DOMESTIC WATER PIPING SYSTEM A. Disinfection of the domestic water piping shall be completed within three (3) weeks prior to building occupancy. Contractor is responsible for disinfecting water piping if used by workers during construction; disinfection during construction does not eliminate the requirement for final disinfection prior to occupancy. Flushing of piping shall be completed within two (2) weeks prior to building occupancy. B. Provide necessary connections at the start of individual sections of mains for adding chlorine. C. Before starting work, verify system is complete, flushed and clean. D. Ensure pH of water to be treated is between 7.4 and 7.6 by adding alkali (caustic soda or soda ash) or acid (hydrochloric). E. Inject disinfectant, free chlorine in liquid, powder, tablet or gas form, throughout system to obtain 50 to 80 mg/L residual. F. Bleed water from all outlets to ensure chlorine distribution throughout the entire domestic water system. G. Verify initial chlorination levels by testing at minimum 15% of outlets located throughout entire building, including the last fixture connected to each main and each branch extending over 50 feet from a main. H. Maintain disinfectant in system for 24 hours, after which test at minimum 15% of outlets located throughout entire building, including the last fixture connected to each main and each branch extending over 50 feet from a main. If final disinfectant residual tests less than 25 mg/L at any one of the tested outlets, flush the entire system and repeat disinfection and testing procedure. I. After final disinfectant residuals test at or above 25 mg/L after a minimum 24-hour duration, flush disinfectant from system at a minimum velocity of 3.0 feet/second until residual is equal to that of incoming water or 1.0 mg/L. J. Take water samples, no sooner than 24 hours after flushing, from 2% of outlets and from water entry. Obtain, analyze, and test samples in accordance with AWWA C651, Section 5 - Verification. K. Disinfection shall comply with CPC - 609.9: Disinfection of Potable Water Systems. END OF SECTION 22 10 00 656 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 30 - 1 PLUMBING SPECIALTIES SECTION 22 10 30 - PLUMBING SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Cleanouts. B. Traps. C. Trap Seals and Primers. D. Floor Drains and Sinks E. Hub Drains and Standpipes F. Roof Drains. G. Backflow Preventers. H. Strainers. I. Unions. J. Water Hammer Arresters. K. Dielectric Fittings (Connections Between Dissimilar Metals). L. Air Vents. M. Drain Valves. N. Relief Valves. 1.2 QUALITY ASSURANCE A. Manufacturer: For each product specified, provide components by same manufacturer throughout. B. Perform work in accordance with State of California Plumbing Codes and municipality of local area standards. C. Piping, Fittings, Valves, and Flux for Potable Water Systems: All components shall be lead free per Federal Act S.3874, Reduction of Lead in Drinking Water Act. D. Valves for potable water systems shall comply with California Assembly Bill AB1953 limiting lead content. Also described in 2019 CPC: 604.2 Lead Content. 1.3 REFERENCES A. ANSI A112.21.1 - Floor Drains. 657 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 30 - 2 PLUMBING SPECIALTIES B. ANSI A112.21.2 - Roof Drains. C. ASSE 1010 - Water Hammer Arresters. D. ANSI A112.6.4 - RoofDrains; The American Society of Mechanical Engineers. E. PDI WH-201 - Water Hammer Arresters. 1.4 SUBMITTALS A. Include sizes, rough-in requirements, service sizes, and finishes. PART 2 - PRODUCTS 2.1 CLEANOUTS A. Provide cleanouts as shown and specified on the drawings as well as required by code. B. Coordinate floor cleanout cover with surrounding floor finish. Provide solid, recessed for tile as applicable. C. Cleanouts on exposed pipes shall be cast iron with heavy duty cast brass plug with raised head. D. Cleanout shall be same size as the pipe up to 6" and 6" for larger pipes. 2.2 TRAPS A. Provide all individual connections to the sanitary system with P-traps, except where such drains discharge directly into a properly trapped collection basin or sump. Unless otherwise specified or shown, traps shall be: 1. Chromium plated cast brass when used with plumbing fixtures or when installed exposed in finished spaces. 2. Insulated at accessible lavatories. 3. Cast iron, deep-seal pattern where concealed above ceiling, below grade or in unfinished areas. 4. Deep-seal pattern of the same material and/or coating where drainage lines are of special materials or coatings such as polypropylene, PVDF, CPVC, etc. B. All traps shall have accessible, removable cleanouts, except where installed on floor drains with removable strainers. C. Each trap shall be completely filled with water at the end of construction but before building turnover to the Owner. All floor drains, floor sinks, etc. shall be filled with water and a 1/2" minimum layer of mineral oil. 2.3 TRAP SEALS AND PRIMERS A. Provide trap seals as specified on the drawings. 658 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 30 - 3 PLUMBING SPECIALTIES B. Provide trap primers as shown and specified on the drawings. 2.4 HUB DRAINS AND STANDPIPES A. A hub drain shall be in the form of a hub or pipe without a grate/strainer extending through the floor for receiving indirect waste. A hub drain has a flood level rim above the finished floor. B. Provide hub drains as shown and specified on the drawings as well as required by code. 2.5 ROOF DRAINS A. Provide roof drains as shown and specified on the drawings as well as required by code. 2.6 STRAINERS A. Unless otherwise indicated, strainers shall be Y-pattern and have stainless steel screens with perforations as follows: 1. Water: a. 1/4" - 2": 3/64" perforations B. Furnish pipe nipple with shutoff valve to blow down all strainer screens. C. Use bronze body strainers in copper piping and iron body strainers in ferrous piping. 2.7 UNIONS A. Copper pipe - wrought copper fitting - ground joint. 2.8 WATER HAMMER ARRESTERS A. Provide water hammer arresters as shown and specified on the drawings as well as required by code. B. ANSI A112.26.1; sized and located in accordance with PDI WH-201, precharged for operation between -100°F and 300°F and maximum 250 psig working pressure. 2.9 DIELECTRIC FITTINGS (CONNECTIONS BETWEEN DISSIMILAR METALS) A. Connections between dissimilar metals shall be insulating dielectric types that provide a water gap between the connected metals, and that either allow no metal path for electron transfer or that provide a wide water gap lined with a non-conductive material to impede electron transfer through the water path. B. Joints shall be rated for the temperature, pressure, and other characteristics of the service in which they are used, including testing procedure. 659 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 30 - 4 PLUMBING SPECIALTIES C. Aluminum, iron, steel, brass, copper, bronze, and stainless steel are commonly used and require isolation from each other with the following exceptions: 1. Iron, steel, and stainless steel connected to each other. 2. Brass, copper, and bronze connected to each other. 3. Brass or bronze valves and specialties connected in closed systems with steel, iron, or stainless steel on both sides of the brass or bronze valves and specialties. Where two or more brass or bronze items occur together, they shall be connected with brass nipples. Brass or bronze valves and specialties cannot be used as a dielectric separation between pipe materials. D. Dielectric protection is required at connections to equipment of a material different than the piping. E. Screwed Joints (acceptable up to 2" size): 1. Dielectric waterway rated for 300 psi CWP and 225°F. 2. Acceptable Manufacturers: Elster Group ClearFlow fittings, Victaulic Series 47, Grinnell Series 407, Matco-Norca. F. Flanged Joints (any size): 1. Use 1/8" minimum thickness, non-conductive, full-face gaskets. 2. Employ one-piece molded sleeve-washer combinations to break the electrical path through the bolts. 3. Sleeve-washers are required on one side only, with sleeves minimum 1/32" thick and washers minimum 1/8" thick. 4. Install steel washers on both sides of flanges to prevent damage to the sleeve- washer. 5. Separate sleeves and washers may be used only if the sleeves are manufactured to exact lengths and installed carefully so the sleeves must extend partially past each steel washer when tightened. 6. Acceptable Manufacturers: EPCO, Central Plastics, Pipeline Seal and Insulator, F. H. Maloney, or Calpico. 2.10 AIR VENTS A. Provide means for venting air at all high points in the piping system and at all other points where air may be trapped. B. At end of main and other points where large volume of air may be trapped - Use 1/4" globe valve, angle type, 125 psi, Crane #89, attached to coupling in top of main, 1/4" discharge pipe turned down with cap. 2.11 DRAIN VALVES A. Drain valves shall be shutoff valves as specified for the intended service with added 3/4" male hose thread outlet and cap. 660 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 30 - 5 PLUMBING SPECIALTIES PART 3 - EXECUTION 3.1 INSTALLATION AND APPLICATION A. Coordinate construction to receive drains at required invert elevations. B. Install all items per manufacturer's instructions. C. Water Hammer Arresters: 1. Install water hammer arresters in accessible locations. Provide access doors as required. Coordinate type with Architect/Engineer/Owner. 2. Water hammer arrestors shall be installed in cold and hot water lines upstream of all plumbing fixtures or equipment, with a quick acting valve or multiple quick acting valves. Quick acting valves shall be defined as solenoid actuated valves, manual flush valves, sensor activated faucets and flush valves, squeeze handle spray faucets, and other similar type valves. 3. Install multiple water hammer arrestors in toilet group branch piping greater than 20 feet in developed length from the cold and hot water mains. D. Cleanouts: 1. Provide cleanouts where shown on the drawings and as required by code, but in no case farther apart than 50 feet in pipe less than 6" size and 100 feet apart in 6" and larger pipes inside the building. Provide cleanouts at bases of all sanitary and storm risers as shown on the drawings and as required by code. 2. Extend cleanouts to the floor with long sweep elbows. 3. Install a full size, two-way cleanout within 5 feet of the foundation inside or outside of building. 4. Extend cleanouts to finished floor or wall surface. Lubricate threaded cleanout plugs with graphite and linseed oil. Ensure clearance at cleanouts for rodding of drainage system. 5. Wall cleanouts shall be installed above the flow line of the pipe they serve, but no less than 12" above the finished floor. E. Yard Cleanouts: 1. Install cleanouts on maximum 90 foot centers (including riser) for pipes 8" and smaller. 2. Extend cleanout to grade. Encase cleanout in 5" thick concrete pad extending 6" beyond cleanout, set low enough not to interfere with lawn mowers. F. Trap Seals and Primers: 1. Install trap primer on drains not receiving continuous discharge and subject to drying out. 2. Connect trap primer to an active water line 1-1/2" in size or less and which will produce a 3 PSI pressure drop upon fixture operation downstream of the trap primer. 661 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 10 30 - 6 PLUMBING SPECIALTIES G. Hub Drains and Standpipes: 1. The top of a hub drain/standpipe shall extend above the finished floor elevation. Refer to drawings for dimensions above the finished floor. 2. Access shall be provided to drains and standpipes for rodding. H. Roof Drains: 1. Roof drains shall have bearing pans. 2. Provide auxiliary support steel under drains as required to prevent movement of the drain. 3. All roof drains shall have underdeck clamps. 4. Drains in built-up roofing systems shall have a 36" x 36", 3 lb density lead sheet flashing. END OF SECTION 22 10 30 662 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 30 00 - 1 Plumbing Equipment SECTION 22 30 00 PLUMBING EQUIPMENT PART 1 - GENERAL 1.1 SECTION INCLUDES A. Water Heaters. 1.2 QUALITY ASSURANCE A. Products and installation of specified products shall conform to recommendations and requirements of the following organizations: 1. American Gas Association (AGA). 2. National Sanitation Foundation (NSF). 3. American Society of Mechanical Engineers (ASME). 4. National Board of Boiler and Pressure Vessel Inspectors (NBBPVI). 5. National Electrical Manufacturers' Association (NEMA). 6. Underwriters' Laboratories (UL). B. Perform work in accordance with State of California Plumbing Codes and municipality of local area standards. C. Water Heater Performance Requirements: Equipment efficiency not less than prescribed by ASHRAE 90.1 when tested in accordance with DOE 10 CFR, ANSI Z21.10.1 and ANSI Z21.10.3. D. Conform to ASME Section VIII for construction of water heaters and heat exchangers. Provide boilers registered with the National Board of Boiler and Pressure Vessel Inspectors. 1.3 REFERENCES A. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. B. ANSI/ASME Section 8D - Pressure Vessels. C. ANSI/NFPA 70 - National Electrical Code. D. ANSI/UL 1453 - Electric Booster and Commercial Storage Tank Water Heaters. E. ASSE 1005 - Water Heater Drain Valves, 3/4" Iron Pipe Size. F. UL 174 - Household Electric Storage Tank Water Heaters. 663 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 30 00 - 2 Plumbing Equipment 1.4 SUBMITTALS A. Submit shop drawings under provisions of Section 22 05 00. B. Include dimension drawings of water heaters indicating components and connections to other equipment and piping. C. Include heat exchanger dimensions, size of tappings, and performance data. D. Include dimensions of tanks, tank lining methods, anchors, attachments, lifting points, tappings, and drains. E. For equipment connected to an electric power source, submit short circuit rating (SCCR) of integrated unit. F. Submit manufacturer's installation instructions including control and electrical power/controls wiring diagrams. G. Submit manufacturer's certificate that pressure vessels meet or exceed specified requirements. H. Submit operation, maintenance, and inspection data, replacement part numbers and availability, and service depot location and telephone number. 1.5 DELIVERY, STORAGE, AND HANDLING A. Provide temporary inlet and outlet caps. Maintain caps in place until installation. 1.6 REGULATORY REQUIREMENTS A. Water heaters shall conform to AGA, ANSI/NFPA 54, ANSI/NFPA 70, ANSI/UL 1453 as applicable. B. Conform to ANSI/ASME Section 8 Division 1 for fabrication of steel pressure vessels. C. Conform to ANSI/ASME Section 10 for manufacture of fiber-reinforced plastic pressure vessels. PART 2 - PRODUCTS 2.1 WATER HEATERS A. All water heaters shall be as scheduled on the drawings. PART 3 - EXECUTION 3.1 INSTALLATION A. Install all items in accordance with manufacturer's instructions. 664 MOORPARK CITY HALL 02/03/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 30 00 - 3 Plumbing Equipment 3.2 WATER HEATER INSTALLATION A. Install water heaters on concrete bases. Coordinate sizes and locations of concrete bases. Refer to Section 22 05 29. B. Install water heaters level and plumb, according to drawings, manufacturer's instructions, and referenced standards. Maintain manufacturer's recommended clearances. Arrange units so controls and devices needing service are accessible. C. Install combination temperature and pressure relief valves in top portion of storage tanks. Use relief valves with sensing elements that extend into tanks. Extend drain piping full size from relief valve and discharge by positive air gap onto closest floor drain. Discharge pipe material shall be same as domestic water piping. END OF SECTION 665 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 40 00 - 1 PLUMBING FIXTURES SECTION 22 40 00 PLUMBING FIXTURES PART 1 - GENERAL 1.1 SECTION INCLUDES A. All plumbing fixtures. 1.2 REFERENCES A. ANSI A112.6.1M - Supports for Off-the-Floor Plumbing Fixtures for Public Use. B. ANSI A112.18.1 - Finished and Rough Brass Plumbing Fixture Fittings. C. ANSI A112.19.1M - Enameled Cast Iron Plumbing Fixtures. D. ANSI A112.19.2M - Vitreous China Plumbing Fixtures. E. ANSI A112.19.3 - Stainless Steel Plumbing Fixtures (Designed for Residential Use). F. ASME A112.19.4 - Porcelain Enameled Formed Steel Plumbing Fixtures. G. ANSI A112.19.5 - Trim for Water-Closet Bowls, Tanks, and Urinals. H. AHRI 1010 - Drinking Fountains and Self-Contained Mechanically Refrigerated Drinking Water Coolers. I. ASSE 1002 - Water Closet Flush Tank Ball Cocks. J. Americans with Disabilities Act (ADA), Title III. K. The Energy Policy Act (EPAct) of 2005. 1.3 SUBMITTALS A. Submit product data under provisions of Section 22 05 00. Submittals shall include fixture carriers for record purposes only. Architect/Engineer does not review or approve carriers except for manufacturer. B. Include fixtures, sizes, rough-in dimensions, utility sizes, trim, and finishes. C. For fixtures and trim requiring electrical connections, submit product data indicating general assembly, components, electrical power/controls wiring diagrams, and service connections. 666 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 40 00 - 2 PLUMBING FIXTURES PART 2 - PRODUCTS 2.1 MATERIALS A. Wall Hung Fixture Carriers: 1. Material: All Metal, ASME/ANSI A112.6.1M. 2. Manufacturers: a. Zurn b. Smith c. Josam d. Watts e. Mifab. 3. Water closet carrier shall be rated to support 500 lbs. unless noted otherwise on the drawings. B. All fixtures shall be as scheduled on the drawings. C. All china shall be from the same manufacturer where possible. D. All lavatory and sink trim shall be from the same manufacturer where possible. E. All fixtures shall be lead free. Faucets, traps, stops, and other fixture accessories shall not contain more lead than allowed per the latest State or Federal Act. PART 3 - EXECUTION 3.1 INSTALLATION A. General Installation Requirements: 1. Review millwork shop drawings. Confirm location and size of fixtures and openings before rough-in and installation. 2. Install each fixture with trap easily removable for servicing and cleaning. Use screwed tailpiece couplings. Connect fixture waste to stack with slip fitting. 3. Provide fixtures with chrome plated rigid or flexible supplies, loose key stops, reducers, and escutcheons. 4. Install components level and plumb. 5. Caulk joint between finish floor and floor mounted fixtures and between finish walls and wall mounted fixtures with silicon caulk. Caulk the joint, between rim and fixture where a fixture builds into a counter top, with caulking compound. Refer to DIVISION 7 for "Caulking" requirements. Color to match fixture. 6. Where there is a possibility of water following pipe brackets, etc., into a wall; caulk escutcheons, space around brackets, etc., to exclude water. Refer to DIVISION 7 for "Caulking" requirements. 7. Refer to architectural drawings for fixture mounting heights. 8. All non-potable outlets shall be clearly marked with a permanently affixed laminated sign with 3/8" high lettering saying "Non-Potable Water Not for Human Consumption." Sign shall have black lettering on a yellow background. 667 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 40 00 - 3 PLUMBING FIXTURES B. Wall-Mounted Fixture Requirements: 1. All wall-mounted fixtures shall have compatible carriers designed for their intended service and suitable for the space available and configuration of fixtures. All carriers shall extend to the floor and be anchored to the slab. C. Floor-Mounted Fixture Requirements: 1. Where floor mounted fixtures are installed on a sloped floor, the open void below the fixture shall be grouted, leveled, and caulked to eliminate stress on the fixture and to prevent water migration to the floor below. D. Exposed or Inside Accessible Cabinets Traps, Valve and Pipe Requirements: 1. All traps exposed under fixtures or inside accessible cabinets shall be chrome plated brass. 2. All water or waste piping for plumbing fixtures that is exposed or inside cabinets shall be chrome plated. 3. All exposed flush valves for water closets and urinals shall have a chrome plated hanger to anchor the piping to the wall. 4. All exposed water supply piping and fittings in a finished space to a shower valve, hose bibb, or other water outlet shall be chrome plated. E. ADA Accessible Exposed Sink and Lavatory Trim: 1. All exposed sink and lavatory traps, piping and angle stops installed at accessible sink and lavatory locations shall include offset style drain tailpiece, p- trap installed near and parallel with back wall, and insulation kit specially manufactured for this installation. Armaflex with duct tape is not acceptable. F. ADA Accessible Water Closet Requirements: 1. Handicapped accessible water closet flush valve handles shall face the center of the stall. 2. Coordinate flush valves in handicap accessible locations with grab bars installed by the General Contractor. Make modifications as necessary to flush valve piping to avoid conflict with grab bars. Common solutions include shortened or offset vacuum breaker tailpieces. 3.2 ADJUSTING AND CLEANING A. Adjust stops or valves for intended water flow rate to fixtures without splashing, noise, or overflow. B. At completion, clean plumbing fixtures, equipment, and faucet aerator screens. 3.3 FIXTURE ROUGH-IN SCHEDULE A. Rough-in fixture piping connections in accordance with table on plumbing drawings of minimum sizes for particular fixtures. 668 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 22 40 00 - 4 PLUMBING FIXTURES END OF SECTION 22 40 00 669 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 1 BASIC HVAC REQUIREMENTS SECTION 23 05 00 BASIC HVAC REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Requirements applicable to all Division 23 Sections. Also refer to Division 01 - General Requirements. B. All materials and installation methods shall conform to the applicable standards, guidelines and codes referenced herein and within each specification section. 1.2 REFERENCES A. CCR California Code of Regulation B. CBC California Building Code C. CFC California Fire Code D. CEC California Electric Code E. CMC California Mechanical Code F. CPC California Plumbing Code G. California Title 24 - Building Energy Efficiency Standards 1.3 SCOPE OF WORK A. This Specification and the associated drawings govern the furnishing, installing, testing and placing into satisfactory operation the Mechanical Systems. B. Each Contractor shall provide all new materials indicated on the drawings and/or in these specifications, and all items required to make the portion of the Mechanical Work a finished and working system. C. All work will be awarded under a single General Contract. The division of work listed below is for the Contractor's convenience and lists normal breakdown of the work. D. The division of work listed below is for the contractors' convenience and lists a normal breakdown of the work. Please refer to the Construction Manager's scope statements for complete scope of work description. 670 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 2 BASIC HVAC REQUIREMENTS E. Scope of Work: 1. Heating Work shall include, but is not necessarily limited to: a. Furnish and install refrigerant piping, accessories, and final charge of refrigerant. b. Furnish and install condensate drain piping from cooling related equipment such as air handlers and cooling coil drain pans. c. Furnish and install firestopping systems for penetrations of fire-rated construction associated with this Contractor's work. d. Complete all applicable tests, certifications, forms, and matrices. 2. Air Conditioning and Ventilating Work shall include, but is not necessarily limited to: a. Furnish and install package rooftop air handling units complete with curbs. b. Furnish and install air-cooled condensing units and curbs. c. Furnish and install complete supply air ductwork systems including all fittings, insulation, and outlets. d. Furnish and install complete return air ductwork systems including all fittings, insulation, and inlets. e. Furnish and install complete exhaust ductwork systems including all fittings, insulation, inlets, and fans. f. Furnish and install all temperature control systems. g. Furnish and install all fire dampers. h. Complete all applicable tests, certifications, forms, and matrices. 3. Testing, Adjusting, and Balancing Work shall include, but is not necessarily limited to: a. Furnish complete testing, adjusting, and balancing as specified in Section 23 05 93, including, but not limited to, air systems, plumbing systems, and verification of control systems. b. Complete all applicable tests, certifications, forms, and matrices. 1.4 DIVISION OF WORK BETWEEN MECHANICAL, ELECTRICAL & CONTROL CONTRACTORS A. Definitions: 1. "Mechanical Contractors" refers to the following: a. Plumbing Contractor. b. Heating Contractor. c. Air Conditioning and Ventilating Contractor. d. Temperature Control Contractor. e. Fire Protection Contractor. f. Testing, Adjusting, and Balancing Contractor. 671 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 3 BASIC HVAC REQUIREMENTS 2. Motor Control Wiring: The wiring associated with the remote operation of the magnetic coils of magnetic motor starters or relays, or the wiring that permits direct cycling of motors by means of devices in series with the motor power wiring. In the latter case the devices are usually single phase and are usually connected to the motor power wiring through a manual motor starter having "Manual-Off-Auto" provisions. 3. Control devices such as start-stop push buttons, thermostats, pressure switches, flow switches, relays, etc., generally represent the types of equipment associated with motor control wiring. 4. Motor control wiring is single phase and usually 120 volts. In some instances, the voltage will be the same as the motor power wiring. Generally, where the motor power wiring exceeds 120 volts, a control transformer is used to give a control voltage of 120 volts. 5. Temperature Control Wiring: The wiring associated with the operation of a motorized damper, solenoid valve or motorized valve, etc., either modulating or two-position, as opposed to wiring which directly powers or controls a motor used to drive equipment such as fans, pumps, etc. a. This wiring will be from a 120 volt source and may continue as 120 volt, or be reduced in voltage (24 volt) in which case a control transformer shall be furnished as part of the temperature control wiring. 6. Control Motor: An electric device used to operate dampers, valves, etc. It may be two-position or modulating. Conventional characteristics of such a motor are 24 volts, 60 cycles, 1 phase, although other voltages may be encountered. 7. Voltage is generally specified and scheduled as distribution voltage. Motor submittals may be based on utilization voltage if it corresponds to the correct distribution voltage. Distribution/Nominal Voltage Utilization Voltage 120 115 208 200 240 230 277 265 480 460 General: 8. The purpose of these Specifications is to outline the Electrical and Mechanical Contractor's responsibilities related to electrical work required for items such as temperature controls, mechanical equipment, fans, chillers, compressors and the like. The exact wiring requirements for much of the equipment cannot be determined until the systems have been selected and submittals reviewed. Therefore, the electrical drawings show only known wiring related to such items. All wiring not shown on the electrical drawings, but required for mechanical systems, is the responsibility of the Mechanical Contractor. 672 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 4 BASIC HVAC REQUIREMENTS 9. Where the drawings require the Electrical Contractor to wire between equipment furnished by the Mechanical Contractor, such wiring shall terminate at terminals provided in the equipment. The Mechanical Contractor shall provide complete electrical power/controls wiring diagrams and supervision to the Electrical Contractor and designate the terminal numbers for correct wiring. 10. All electrical work shall conform to the National Electrical Code. All provisions of the Electrical Specifications concerning wiring, protection, etc., apply to wiring provided by the Mechanical Contractor unless noted otherwise. 11. Control low (24V) and control line (120V) voltage wiring, conduit, and related switches and relays required for the automatic control and/or interlock of motors and equipment, including final connection, are to be furnished and installed under Divisions 21, 22 and 23. Materials and installation to conform to Class 1 or 2 requirements, California Electrical Code Article 725. 12. All Contractors shall establish utility elevations prior to fabrication and shall coordinate their material and equipment with other trades. When a conflict arises, priority is as follows: a. Light fixtures. b. Electrical busduct. c. Sheet metal. d. Electrical cable trays, including access space. e. Sprinkler piping and other piping. f. Electrical conduits and wireway. B. Mechanical Contractor's Responsibility: 1. Assumes responsibility for internal wiring of all equipment provided by the Mechanical Contractor, for example: a. Split System Units. b. Packaged Rooftop Units. 2. Assumes all responsibility for the Temperature Control wiring, when the Temperature Control Contractor is a Subcontractor to the Mechanical Contractor. 3. Shall verify all existing equipment sizes and capacities where units are to be modified, moved or replaced. Contractor shall notify Architect/Engineer of any discrepancies prior to ordering new units or replacement parts, including replacements of equipment motors. 4. Temperature Control Subcontractor's Responsibility: a. Wiring of all devices needed to make the Temperature Control System functional. b. Verifying any control wiring on the electrical drawings as being by the Electrical Contractor. All wiring required for the Control System, but not shown on the electrical drawings, is the responsibility of the Temperature Control Contractor. c. Coordinating equipment locations (such as relays, transformers, etc.) with the Electrical Contractor, where wiring of the equipment is by the Electrical Contractor. 673 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 5 BASIC HVAC REQUIREMENTS 5. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. C. Electrical Contractor's Responsibility: 1. Provides disconnect devices shown on the Electrical Drawings or indicated to be by the Electrical Contractor on the Mechanical Drawings or Specifications. 2. Installs and wires all remote control devices furnished by the Mechanical Contractor or Temperature Control Contractor when so noted on the Electrical Drawings. 3. Provides motor control and temperature control wiring, where so noted on the drawings. 4. Coordinate with the Mechanical Contractor for size of motors and/or other electrical devices involved with repair or replacement of existing equipment. 5. Furnishes, installs and connects all relays, etc., for automatic shutdown of certain fans upon actuation of the Fire Alarm System as indicated and specified in Division 28. 6. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. 1.5 COORDINATION DRAWINGS A. Definitions: 1. Coordination Drawings: A compilation of the pertinent layout and system drawings that show the sizes and locations, including elevations, of system components and required access areas to ensure that no two objects will occupy the same space. a. Mechanical trades shall include, but are not limited to, mechanical equipment, ductwork, fire protection systems, and any item that may impact coordination with other disciplines. b. Electrical trades shall include, but are not limited to, electrical equipment, conduit 1.5" (40 mm) and larger, conduit racks, cable trays, pull boxes, transformers, raceway, busway, lighting, ceiling-mounted devices, and any item that may impact coordination with other disciplines. c. Technology trades shall include, but are not limited to, technology equipment, racks, conduit 1.5" (40 mm) and larger, conduit racks, cable trays, ladder rack, pull boxes, raceway, ceiling-mounted devices, and any item that may impact coordination with other disciplines. d. Maintenance clearances and code-required dedicated space shall be included. e. The coordination drawings shall include all underground, underfloor, in- floor, in chase, and vertical trade items. 2. The contractors shall use the coordination process to identify the proper sequence of installation of all utilities above ceilings and in other congested areas, to ensure an orderly and coordinated end result, and to provide adequate access for service and maintenance. 674 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 6 BASIC HVAC REQUIREMENTS B. Participation: 1. The contractors and subcontractors responsible for work defined above shall participate in the coordination drawing process. 2. One contractor shall be designated as the Coordinating Contractor for purposes of preparing a complete set of composite electronic CAD coordination drawings that include all applicable trades, and for coordinating the activities related to this process. The Coordinating Contractor for this project shall be the Mechanical Contractor. a. The Coordinating Contractor shall utilize personnel familiar with requirements of this project and skilled as draftspersons/CAD operators, competent to prepare the required coordination drawings. 3. Electronic CAD drawings shall be submitted to the Coordinating Contractor and owner for addition of work by other trades. IMEG will provide electronic file copies of ventilation drawings for contractor's use if the contractor signs and returns an "Electronic File Transfer" waiver provided by IMEG. IMEG will not consider blatant reproductions of original file copies an acceptable alternative for coordination drawings. C. Drawing Requirements: 1. The file format and file naming convention shall be coordinated with and agreed to by all contractors participating in the coordination process and the Owner. Drawings to be submitted to IMEG for approval. Coordination between trades shall occur prior to bid. a. Scale of drawings: 1) General plans: 1/4 Inch = 1'-0" (minimum). 2) Mechanical, electrical, communication rooms, and including the surrounding areas within 10 feet: 1/2 Inch = 1'-0" (minimum). 3) Shafts and risers: 1/2 Inch = 1'-0" (minimum). 4) Sections of shafts and electrical equipment rooms: 1/4 Inch = 1'-0" (minimum). 5) Sections of congested areas: 1/2 Inch = 1'-0" (minimum). 2. Ductwork layout drawings shall be the baseline system for other components. Ductwork layout drawings shall be modified to accommodate other components as the coordination process progresses. 3. There may be more drawings required for risers, top and bottom levels of shafts. 4. The minimum quantity of drawings will be established at the first coordination meeting and sent to the A/E for review. Additional drawings may be required if other areas of congestion are discovered during the coordination process. D. General: 1. Coordination drawing files shall be made available to the A/E and Owner's Representative. The A/E will only review identified conflicts and give an opinion, but will not perform as a coordinator. 675 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 7 BASIC HVAC REQUIREMENTS 2. A plotted set of coordination drawings shall be available at the project site. 3. Coordination drawings are not shop drawings and shall not be submitted as such. 4. The contract drawings are schematic in nature and do not show every fitting and appurtenance for each utility. Each contractor is expected to have included in the bid sufficient fittings, material, and labor to allow for adjustments in routing of utilities made necessary by the coordination process and to provide a complete and functional system. 5. The contractors will not be allowed additional costs or time extensions due to participation in the coordination process. 6. The contractors will not be allowed additional costs or time extensions for additional fittings, reroutings or changes of duct size, that are essentially equivalent sizes to those shown on the drawings and determined necessary through the coordination process. 7. The A/E reserves the right to determine space priority of equipment in the event of spatial conflicts or interference between equipment, piping, conduit, ducts, and equipment provided by the trades. 8. Changes to the contract documents that are necessary for systems installation and coordination shall be brought to the attention of the A/E. 9. Access panels shall preferably occur only in gypsum board walls or plaster ceilings where indicated on the drawings. a. Access to mechanical, electrical, technology, and other items located above the ceiling shall be through accessible lay-in ceiling tile areas. b. Potential layout changes shall be made to avoid additional access panels. c. Additional access panels shall not be allowed without written approval from the A/E at the coordination drawing stage. d. Providing additional access panels shall be considered after other alternatives are reviewed and discarded by the A/E and the Owner's Representative. e. When additional access panels are required, they shall be provided without additional cost to the Owner. 10. Complete the coordination drawing process and obtain sign off of the drawings by all contractors prior to installing any of the components. 11. Conflicts that result after the coordination drawings are signed off shall be the responsibility of the contractor or subcontractor who did not properly identify their work requirements, or installed their work without proper coordination. 12. Updated coordination drawings that reflect as-built conditions may be used as record documents. 676 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 8 BASIC HVAC REQUIREMENTS 1.6 QUALITY ASSURANCE A. Contractor's Responsibility Prior to Submitting Pricing Data: 1. The Contractor is responsible for constructing complete and operating systems. The Contractor acknowledges and understands that the Contract Documents are a two-dimensional representation of a three-dimensional object, subject to human interpretation. This representation may include imperfect data, interpreted codes, utility guidelines, three-dimensional conflicts, and required field coordination items. Such deficiencies can be corrected when identified prior to ordering material and starting installation. The Contractor agrees to carefully study and compare the individual Contract Documents and report at once in writing to the Design Team any deficiencies the Contractor may discover. The Contractor further agrees to require each subcontractor to likewise study the documents and report at once any deficiencies discovered. 2. The Contractor shall resolve all reported deficiencies with the Architect/Engineer prior to awarding any subcontracts, ordering material, or starting any work with the Contractor's own employees. Any work performed prior to receipt of instructions from the Design Team will be done at the Contractor's risk. B. Qualifications: 1. Only products of reputable manufacturers are acceptable. 2. All Contractors and subcontractors shall employ only workers skilled in their trades. C. Compliance with Codes, Laws, Ordinances: 1. If there is a discrepancy between the codes and regulations and these specifications, the Architect/Engineer shall determine the method or equipment used. 2. If the Contractor notes, at the time of bidding, that any parts of the drawings or specifications do not comply with the codes or regulations, Contractor shall inform the Architect/Engineer in writing, requesting a clarification. If there is insufficient time for this procedure, Contractor shall submit with the proposal a separate price to make the system comply with the codes and regulations. 3. All changes to the system made after letting of the contract, to comply with codes or requirements of Inspectors, shall be made by the Contractor without cost to the Owner. 4. If there is a discrepancy between manufacturer's recommendations and these specifications, the manufacturer's recommendations shall govern. 5. All rotating shafts and/or equipment shall be completely guarded from all contact. Partial guards and/or guards that do not meet all applicable OSHA standards are not acceptable. Contractor is responsible for providing this guarding if it is not provided with the equipment supplied. D. Permits, Fees, Taxes, Inspections: 1. Procure all applicable permits and licenses. 677 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 9 BASIC HVAC REQUIREMENTS 2. Abide by all laws, regulations, ordinances, and other rules of the State or Political Subdivision where the work is done, or as required by any duly constituted public authority. 3. Pay all charges for permits or licenses. 4. Pay all fees and taxes imposed by the State, Municipal and/or other regulatory bodies. 5. Pay all charges arising out of required inspections by an authorized body as applicable. 6. Pay all charges arising out of required contract document reviews associated with the project and as initiated by the Owner or authorized agency/consultant as applicable. 7. Where applicable, all fixtures, equipment and materials shall be listed by Underwriters' Laboratories, Inc. and approved by FM Global. E. Examination of Drawings: 1. The drawings for the mechanical work are completely diagrammatic, intended to convey the scope of the work and to indicate the general arrangements and locations of equipment, outlets, etc., and the approximate sizes of equipment. 2. Contractor shall determine the exact locations of equipment and rough-ins, and the exact routing of pipes and ducts to best fit the layout of the job. 3. Scaling of the drawings is not sufficient or accurate for determining these locations. 4. Where job conditions require reasonable changes in indicated arrangements and locations, such changes shall be made by the Contractor at no additional cost to the Owner. 5. Because of the scale of the drawings, certain basic items, such as fittings, boxes, valves, unions, etc., may not be shown, but where required by other sections of the specifications or required for proper installation of the work, such items shall be furnished and installed. 6. If an item is either on the drawings or in the specifications, it shall be included in this contract. 7. Determination of quantities of material and equipment required shall be made by the Contractor from the documents. Where discrepancies arise between drawings, schedules and/or specifications, the greater number shall govern. 8. Where used in mechanical documents, the word "furnish" shall mean supply for use, the word "install" shall mean connect complete and ready for operation, and the word "provide" shall mean to supply for use and connect complete and ready for operation. a. Any item listed as furnished shall also be installed, unless otherwise noted. b. Any item listed as installed shall also be furnished, unless otherwise noted. F. Field Measurements: 1. Verify all pertinent dimensions at the job site before ordering any materials or fabricating any supports, pipes or ducts. G. Electronic Media/Files: 678 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 10 BASIC HVAC REQUIREMENTS 1. Construction drawings for this project have been prepared utilizing AutoCAD MEP. 2. Contractors and Subcontractors may request electronic media files of the contract drawings and/or copies of the specifications. Specifications will be provided in PDF format. 3. Upon request for electronic media, the Contractor shall complete and return a signed "Electronic File Transmittal" form provided by IMEG. 4. If the information requested includes floor plans prepared by others, the Contractor will be responsible for obtaining approval from the appropriate Design Professional for use of that part of the document. 5. The electronic contract documents can be used for preparation of shop drawings and as-built drawings only. The information may not be used in whole or in part for any other project. 6. The drawings prepared by IMEG for bidding purposes may not be used directly for shop drawings. 7. The use of these CAD documents by the Contractor does not relieve them from their responsibility for coordination of work with other trades and verification of space available for the installation. 1.7 SUBMITTALS A. Submittals shall be required for the following items, and for additional items where required elsewhere in the specifications or on the drawings. B. General Submittal Procedures: In addition to the provisions of Division 01, the following are required: 1. Transmittal: Each transmittal shall include the following: a. Date b. Project title and number c. Contractor's name and address d. Division of work (e.g., plumbing, heating, ventilating, etc.) e. Description of items submitted and relevant specification number f. Notations of deviations from the contract documents g. Other pertinent data 2. Submittal Cover Sheet: Each submittal shall include a cover sheet containing: a. Date b. Project title and number c. Architect/Engineer d. Contractor and subcontractors' names and addresses e. Supplier and manufacturer's names and addresses f. Division of work (e.g., plumbing, heating, ventilating, etc.) g. Description of item submitted (using project nomenclature) and relevant specification number h. Notations of deviations from the contract documents i. Other pertinent data j. Provide space for Contractor's review stamps 679 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 11 BASIC HVAC REQUIREMENTS 3. Composition: a. Submittals shall be submitted using specification sections and the project nomenclature for each item. b. Individual submittal packages shall be prepared for items in each specification section. All items within a single specification section shall be packaged together where possible. An individual submittal may contain items from multiple specifications sections if the items are intimately linked (e.g., pumps and motors). c. All sets shall contain an index of the items enclosed with a general topic description on the cover. 4. Content: Submittals shall include all fabrication, erection, layout, and setting drawings; manufacturers' standard drawings; schedules; descriptive literature, catalogs and brochures; performance and test data; electrical power criteria (e.g., voltage, phase, amps, horsepower, kW, etc.) wiring and control diagrams; Short Circuit Current Rating (SCCR); dimensions; shipping and operating weights; shipping splits; service clearances; and all other drawings and descriptive data of materials of construction as may be required to show that the materials, equipment or systems and the location thereof conform to the requirements of the contract documents. 5. Contractor's Approval Stamp: a. The Contractor shall thoroughly review and approve all shop drawings before submitting them to the Architect/Engineer. The Contractor shall stamp, date and sign each submittal certifying it has been reviewed. b. Unstamped submittals will be rejected. c. The Contractor's review shall include, but not be limited to, verification of the following: 1) Only approved manufacturers are used. 2) Addenda items have been incorporated. 3) Catalog numbers and options match those specified. 4) Performance data matches that specified. 5) Electrical characteristics and loads match those specified. 6) Equipment connection locations, sizes, capacities, etc. have been coordinated with other affected trades. 7) Dimensions and service clearances are suitable for the intended location. 8) Equipment dimensions are coordinated with support steel, housekeeping pads, openings, etc. 9) Constructability issues are resolved (e.g., weights and dimensions are suitable for getting the item into the building and into place, sinks fit into countertops, etc.). d. The Contractor shall review, stamp and approve all subcontractors' submittals as described above. 680 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 12 BASIC HVAC REQUIREMENTS e. The Contractor's approval stamp is required on all submittals. Approval will indicate the Contractor's review of all material and a complete understanding of exactly what is to be furnished. Contractor shall clearly mark all deviations from the contract documents on all submittals. If deviations are not marked by the Contractor, then the item shall be required to meet all drawing and specification requirements. 6. Submittal Identification and Markings: a. The Contractor shall clearly mark each item with the same nomenclature applied on the drawings or in the specifications. b. The Contractor shall clearly indicate the size, finish, material, etc. c. Where more than one model is shown on a manufacturer's sheet, the Contractor shall clearly indicate exactly which item and which data is intended. d. All marks and identifications on the submittals shall be unambiguous. 7. Schedule submittals to expedite the project. Coordinate submission of related items. 8. Identify variations from the contract documents and product or system limitations that may be detrimental to the successful performance of the completed work. 9. Reproduction of contract documents alone is not acceptable for submittals. 10. Incomplete submittals will be rejected without review. Partial submittals will only be reviewed with prior approval from the Architect/Engineer. 11. Submittals not required by the contract documents may be returned without review. 12. The Architect/Engineer's responsibility shall be to review one set of shop drawing submittals for each product. If the first submittal is incomplete or does not comply with the drawings and/or specifications, the Contractor shall be responsible to bear the cost for the Architect/Engineer to recheck and handle the additional shop drawing submittals. 13. Submittals shall be reviewed and approved by the Architect/Engineer before releasing any equipment for manufacture or shipment. 14. Contractor's responsibility for errors, omissions. or deviation from the contract documents in submittals is not relieved by the Architect/Engineer's approval. 15. Schedule shall allow for adequate time to perform orderly and proper review of submittals, including time for consultants and Owner if required, and resubmittals by Contractor if necessary, and to cause no delay in Work or in activities of Owner or other contractors. a. Allow at least two weeks for Architect's/Engineer's review and processing of each submittal. 16. Architect/Engineer reserves the right to withhold action on a submittal which, in the Architect/Engineer's opinion, requires coordination with other submittals until related submittals are received. The Architect/Engineer will notify the Contractor, in writing, when they exercise this right. C. Electronic Submittal Procedures: 681 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 13 BASIC HVAC REQUIREMENTS 1. Distribution: Email submittals as attachments to all parties designated by the Architect/Engineer, unless a web-based submittal program is used. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. Submittal file name: 23 XX XX.description.YYYYMMDD b. Transmittal file name: 23 XX XX.description.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 1.8 SCHEDULE OF VALUES A. The requirements herein are in addition to the provisions of Division 01. B. Format: 1. Use AIA Document Continuation Sheets G703 or another similar form approved by the Owner and Architect/Engineer. 2. Submit in Excel format. 3. Support values given with substantiating data. C. Preparation: 1. Itemize work required by each specification section and list all providers. All work provided by subcontractors and major suppliers shall be listed on the Schedule of Values. List each subcontractor and supplier by company name. 2. Break down all costs into: a. Material: Delivered cost of product with taxes paid. b. Labor: Labor cost, excluding overhead and profit. 3. Itemize the cost for each of the following: a. Overhead and profit. b. Bonds. c. Insurance. d. General Requirements: Itemize all requirements. 4. For each line item having an installed cost of more than $5,000, break down costs to list major products or operations under each item. At a minimum, provide material and labor cost line items for the following: 682 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 14 BASIC HVAC REQUIREMENTS a. Each piece of equipment requiring shop drawings (e.g., each air handling unit, pump, exhaust fan, etc.). Use the equipment nomenclature (AHU-1, P- 1, EF-1, etc.) on the Schedule of Values. b. Each type of small unitary equipment (e.g., FCUs, UHs, CABs, etc.). Multiple units of the same type can be listed together, provided quantities are also listed so unit costs can be determined. c. Each piping system (chilled water, heating water, steam, condensate, etc.). In addition, for larger projects, break down the material and labor for each piping system based on geography (building, floor, and/or wing). d. Each duct system (supply, return, relief, outside air, etc.) listed separately for each unit they serve (AHU-1 supply air ductwork, AHU-1 return air ductwork, etc.). e. Pipe insulation with separate material and labor line items for each piping system listed above. f. Duct insulation with separate material and labor line items for each duct system listed above. g. Temperature controls broken down into material and labor for the following: 1) Engineering 2) Controllers, devices, sensors, etc. 3) Control dampers 4) Conduit 5) Wiring 6) Programming 7) Commissioning h. Site utilities (5' beyond building) i. Seismic design j. Air balancing k. Commissioning l. Record drawings m. Punchlist and closeout D. Update Schedule of Values when: 1. Indicated by Architect/Engineer. 2. Change of subcontractor or supplier occurs. 3. Change of product or equipment occurs. 1.9 CHANGE ORDERS A. A detailed material and labor takeoff shall be prepared for each change order, along with labor rates and markup percentages. Change orders shall be broken down by sheet or associated individual line item indicated in the change associated narrative, whichever provides the most detailed breakdown. Change orders with inadequate breakdown will be rejected. B. Itemized pricing with unit cost shall be provided from all distributors and associated subcontractors. C. Change order work shall not proceed until authorized. 683 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 15 BASIC HVAC REQUIREMENTS 1.10 EQUIPMENT SUPPLIERS' INSPECTION A. The following equipment shall not be placed in operation until a competent installation and service representative of the manufacturer has inspected the installation and certified that the equipment is properly installed, adjusted and lubricated; that preliminary operating instructions have been given; and that the equipment is ready for operation: 1. Air Cooled Condensers 2. Condensing Units B. Contractor shall arrange for and obtain supplier's on-site inspection(s) at proper time(s) to assure each phase of equipment installation and/or connection is in accordance with the manufacturer's instructions. C. Submit copies of start-up reports to the Architect/Engineer and include copies of Owner's Operation and Maintenance Manuals. 1.11 PRODUCT DELIVERY, STORAGE, HANDLING & MAINTENANCE A. Exercise care in transporting and handling to avoid damage to materials. Store materials on the site to prevent damage. Keep materials clean, dry and free from harmful conditions. Immediately remove any materials that become wet or that are suspected of becoming contaminated with mold or other organisms. B. Keep all bearings properly lubricated and all belts properly tensioned and aligned. C. Coordinate the installation of heavy and large equipment with the General Contractor and/or Owner. If the Mechanical Contractor does not have prior documented experience in rigging and lifting similar equipment, he/she shall contract with a qualified lifting and rigging service that has similar documented experience. Follow all equipment lifting and support guidelines for handling and moving. D. Contractor is responsible for moving equipment into the building and/or site. Contractor shall review site prior to bid for path locations and any required building modifications to allow movement of equipment. Contractor shall coordinate the work with other trades. 1.12 WARRANTY A. Provide one-year warranty, unless otherwise noted, to the Owner for all fixtures, equipment, materials, and workmanship. B. The warranty period for all work in this Division of the specifications shall commence on the date of final acceptance, unless a whole or partial system or any separate piece of equipment or component is put into use for the benefit of any party other than the installing contractor with prior written authorization. In this instance, the warranty period shall commence on the date when such whole system, partial system or separate piece of equipment or component is placed in operation and accepted in writing by the Owner. 684 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 16 BASIC HVAC REQUIREMENTS C. Warranty requirements shall extend to correction, without cost to the Owner, of all Work found to be defective or nonconforming to the contract documents. The Contractor shall bear the cost of correcting all damage resulting from defects or nonconformance with contract documents. 1.13 INSURANCE A. Contractor shall maintain insurance coverage as set forth in Division 0 of these specifications. 1.14 MATERIAL SUBSTITUTION A. Where several manufacturers' names are given, the scheduled manufacturer is the basis for job design and establishes the quality required. B. Equivalent equipment manufactured by the other listed manufacturers may be used. Contractor shall ensure that all items submitted by these other manufacturers meet all requirements of the drawings and specifications and fits in the allocated space. When using other listed manufacturers, the Contractor shall assume responsibility for any and all modifications necessary (including, but not limited to structural supports, electrical connections, piping and ductwork connections and arrangement, plumbing connections and rough-in, and regulatory agency approval, etc.) and coordinate such with other contractors. C. Any material, article or equipment of other unnamed manufacturers which will adequately perform the services and duties imposed by the design and is of a quality equal to or better than the material, article or equipment identified by the drawings and specifications may be used if approval is secured in writing from the Architect/Engineer not later than ten days prior to the bid opening. D. This Contractor assumes all costs incurred as a result of using the offered material, article or equipment, on the Contractors part or on the part of other Contractors whose work is affected. E. This Contractor may list voluntary add or deduct prices for alternate materials on the bid form. These items will not be used in determining the low bidder. F. All material substitutions requested later than ten (10) days prior to bid opening must be listed as voluntary changes on the bid form. 685 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 17 BASIC HVAC REQUIREMENTS PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 JOBSITE SAFETY A. Neither the professional activities of the Architect/Engineer, nor the presence of the Architect/Engineer or the employees and subconsultants at a construction site, shall relieve the Contractor and other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions of the work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Architect/Engineer and personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The Contractor is solely responsible for jobsite safety. The Architect/Engineer and the Architect/Engineer's consultants shall be indemnified and shall be made additional insureds under the Contractor's general liability insurance policy. 3.2 ARCHITECT/ENGINEER OBSERVATION OF WORK A. The Contractor shall provide seven (7) calendar days' notice to the Architect/Engineer prior to: 1. Covering exterior walls, interior partitions and chases. 2. Installing hard or suspended ceilings and soffits. B. The Architect/Engineer will have the opportunity to review the installation and provide a written report noting deficiencies requiring correction. The Contractor's schedule shall account for these reviews and show them as line items in the approved schedule. C. Above-Ceiling Final Observation 1. All work above the ceilings must be complete prior to the Architect/Engineer's review. This includes, but is not limited to: a. Pipe insulation is installed and fully sealed. b. Pipe and duct wall penetrations are sealed. c. Main, branch and flexible ducts are installed. d. Diffusers, registers and grilles are installed and connected to ductwork. 2. In order to prevent the Above-Ceiling Final Observation from occurring too early, the Contractor shall review the status of the work and certify, in writing, that the work is ready for the Above-Ceiling Final Observation. 3. It is understood that if the Architect/Engineer finds the ceilings have been installed prior to this review and prior to 7 days elapsing, the Architect/Engineer may not recommend further payments to the contractor until such time as full access has been provided. 686 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 18 BASIC HVAC REQUIREMENTS 3.3 PROJECT CLOSEOUT A. The following paragraphs supplement the requirements of Division 01. B. Final Jobsite Observation: 1. In order to prevent the Final Jobsite Observation from occurring too early, the Contractor is required to review the completion status of the project and certify that the job is ready for the final jobsite observation. 2. Attached to the end of this section is a typical list of items that represent the degree of job completeness expected prior to requesting a review. 3. Upon Contractor certification that the project is complete and ready for a final observation, the Contractor shall sign the attached certification and return it to the Architect/Engineer so that the final observation can be scheduled. 4. It is understood that if the Architect/Engineer finds the job not ready for the final observation and that additional trips and observations are required to bring the project to completion, the costs incurred by the Architect/Engineer's additional time and expenses will be deducted from the Contractor's contract retainage prior to final payment at the completion of the job. C. Before final payment is authorized, this Contractor must submit the following: 1. Operation and maintenance manuals with copies of approved shop drawings. 2. Record documents including marked-up or reproducible drawings and specifications. 3. A report documenting the instructions given to the Owner's representatives complete with the number of hours spent in the instruction. The report shall bear the signature of an authorized agent of This Contractor and shall be signed by the Owner's representatives. 4. Start-up reports on all equipment requiring a factory installation inspection or start-up. 5. Provide spare parts, maintenance, and extra materials in quantities specified in individual specification sections. Deliver to project site; receipt by Architect/Engineer required prior to final payment approval. 3.4 OPERATION AND MAINTENANCE MANUALS A. General: 1. Provide an electronic copy of the O&M manuals as described below for Architect/Engineer's review and approval. The electronic copy shall be corrected as required to address the Architect/Engineer's comments. Once corrected, electronic copies and paper copies shall be distributed as directed by the Architect/Engineer. 2. Approved O&M manuals shall be completed and in the Owner's possession prior to Owner's acceptance and at least 10 days prior to instruction of operating personnel. B. Electronic Submittal Procedures: 687 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 19 BASIC HVAC REQUIREMENTS 1. Distribution: Email the O&M manual as attachments to all parties designated by the Architect/Engineer. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. O&M file name: O&M.div23.contractor.YYYYMMDD b. Transmittal file name: O&Mtransmittal.div23.contractor.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 6. Provide the Owner with an approved copy of the O&M manual on compact discs (CD), digital video discs (DVD), or flash drives with a permanently affixed label, printed with the title "Operation and Maintenance Instructions", title of the project and subject matter of disc/flash drive when multiple disc/flash drives are required. 7. All text shall be searchable. 8. Bookmarks shall be used, dividing information first by specification section, then systems, major equipment and finally individual items. All bookmark titles shall include the nomenclature used in the construction documents and shall be an active link to the first page of the section being referenced. C. Operation and Maintenance Instructions shall include: 1. Title Page: Include title page with project title, Architect, Engineer, Contractor, all subcontractors, and major equipment suppliers, with addresses, telephone numbers, website addresses, email addresses and point of contacts. Website URLs and email addresses shall be active links in the electronic submittal. 2. Table of Contents: Include a table of contents describing specification section, systems, major equipment, and individual items. 3. Copies of all final approved shop drawings and submittals. Include Architect's/Engineer's shop drawing review comments. Insert the individual shop drawing directly after the Operation and Maintenance information for the item(s) in the review form. 4. Copy of final approved test and balance reports. 5. Copies of all factory inspections and/or equipment startup reports. 6. Copies of warranties. 7. Schematic electrical power/controls wiring diagrams of the equipment that have been updated for field conditions. Field wiring shall have label numbers to match drawings. 8. Dimensional drawings of equipment. 9. Capacities and utility consumption of equipment. 10. Detailed parts lists with lists of suppliers. 11. Operating procedures for each system. 688 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 20 BASIC HVAC REQUIREMENTS 12. Maintenance schedule and procedures. Include a chart listing maintenance requirements and frequency. 13. Repair procedures for major components. 14. List of lubricants in all equipment and recommended frequency of lubrication. 15. Instruction books, cards, and manuals furnished with the equipment. 3.5 INSTRUCTING THE OWNER'S REPRESENTATIVES A. Adequately instruct the Owner's designated representatives in the maintenance, care, and operation of all systems installed under this contract. B. Provide verbal and written instructions to the Owner's representatives by FACTORY PERSONNEL in the care, maintenance, and operation of the equipment and systems. C. Contractor shall make a DVD video recording of instructions to the Owner while explaining the system so additional personnel may view the instructions at a later date. The video recording shall be the property of the Owner. D. The Owner has the option to make a video recording of all instructions. Coordinate schedule of instructions to facilitate this recording. E. The instructions shall include: 1. Explanation of all system flow diagrams. 2. Explanation of all air handling systems. 3. Temperature control system operation including calibration, adjustment and proper operating conditions of all sensors. 4. Maintenance of equipment. 5. Smoke control systems. 6. Start-up procedures for all major equipment. 7. Explanation of seasonal system changes. F. The Contractor shall prepare a detailed, written training agenda and submit it to the Architect/Engineer a minimum of two weeks prior to the formal training for approval. The written agenda shall include specific training points within the items described above. For example: how to adjust setpoints, troubleshooting, proper start-up, proper shut-down, seasonal changes, draining, venting, changing filters, changing belts, etc. Failure to provide and follow an approved training agenda may result in additional training required at the expense of the Contractor. G. Operating Instructions: 1. Contractor is responsible for all instructions to the Owner's representatives for the mechanical and control systems. 2. If the Contractor does not have staff that can adequately provide the required instructions the Contractor shall include in the bid an adequate amount to reimburse the Owner for the Architect/Engineer to perform these services. 689 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 21 BASIC HVAC REQUIREMENTS 3.6 SYSTEM STARTING AND ADJUSTING A. The mechanical systems shall be complete and operating. System startup, testing, adjusting, and balancing to obtain satisfactory system performance is the responsibility of the Contractor. This includes calibration and adjustments of all controls, noise level adjustments and final comfort adjustments as required. B. Complete all manufacturer-recommended startup procedures and checklists to verify proper motor rotation, electrical power voltage is within equipment limitations, equipment controls maintain pressures and temperatures within acceptable ranges, all filters and protective guards are in-place, acceptable access is provided for maintenance and servicing, and equipment operation does not pose a danger to personnel or property. C. Operate all HVAC systems continuously for at least one week prior to occupancy to bring construction materials to suitable moisture levels. Areas with mechanical cooling shall be maintained below 60% RH. D. Contractor shall adjust the mechanical systems and controls at season changes during the one year warranty period, as required, to provide satisfactory operation and to prove performance of all systems in all seasons. E. All operating conditions and control sequences shall be tested during the start-up period. Test all interlocks, safety shutdowns, controls, and alarms. F. The Contractor, subcontractors, and equipment suppliers shall have skilled technicians to ensure that all systems perform properly. If the Architect/Engineer is requested to visit the job site for trouble shooting, assisting in start-up, obtaining satisfactory equipment operation, resolving installation and/or workmanship problems, equipment substitution issues or unsatisfactory system performance, including call backs during the warranty period, through no fault of the design; the Contractor shall reimburse the Owner on a time and materials basis for services rendered at the Architect/Engineer's standard hourly rates in effect when the services are requested. The Contractor shall pay the Owner for services required that are product, installation or workmanship related. Payment is due within 30 days after services are rendered. 3.7 RECORD DOCUMENTS A. The following paragraphs supplement Division 01 requirements. B. Maintain at the job site a separate and complete set of mechanical drawings and specifications with all changes made to the systems clearly and permanently marked in complete detail. 690 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 22 BASIC HVAC REQUIREMENTS C. Mark drawings to indicate revisions to piping and ductwork, size and location, both exterior and interior; including locations of coils, dampers, other control devices, filters, and other units requiring periodic maintenance or repair; actual equipment locations, dimensioned from column lines; actual inverts and locations of underground piping; concealed equipment, dimensioned from column lines; mains and branches of piping systems, with valves and control devices located and numbered, concealed unions located, and with items requiring maintenance located (e.g., traps, strainers, expansion compensators, tanks, etc.); Change Orders; concealed control system devices. D. Before completion of the project, a set of reproducible mechanical drawings will be given to the Contractor for transfer of all as-built conditions from the paper set maintained at the job site. All marks on reproducibles shall be clear and permanent. E. Mark specifications to show approved substitutions; Change Orders, and actual equipment and materials used. F. Record changes daily and keep the marked drawings available for the Architect/Engineer's examination at any normal work time. G. Upon completing the job, and before final payment is made, give the marked-up drawings to the Architect/Engineer. 3.8 ADJUST AND CLEAN A. Thoroughly clean all equipment and systems prior to the Owner's final acceptance of the project. Clean all foreign paint, grease, oil, dirt, labels, stickers, and other foreign material from all equipment. B. Clean all drain pans and areas where moisture is present. Immediately report any mold, biological growth, or water damage. C. Remove all rust, scale, dirt, oils, stickers and thoroughly clean exterior of all exposed bare metal ductwork, piping, hangers, and accessories. D. Remove all rubbish, debris, etc., accumulated during construction from the premises. 3.9 SPECIAL REQUIREMENTS A. Contractor shall coordinate the installation of all equipment, valves, dampers, operators, etc., with other trades to maintain clear access area for servicing. B. All equipment shall be installed in such a way to maximize access to parts needing service or maintenance. Review the final field location, placement, and orientation of equipment with the Owner's designated representative prior to setting equipment. C. Installation of equipment or devices without regard to coordination of access requirements and confirmation with the Owner's designated representative will result in removal and reinstallation of the equipment at the Contractor's expense. D. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 691 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 23 BASIC HVAC REQUIREMENTS 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 3.10 MAINTAINING CLEAN DUCTWORK THROUGHOUT CONSTRUCTION A. Throughout the duration of construction, all ductwork shall be capped or sealed with sheet metal caps, polyethylene film, or other airtight protective to keep dust, dirt, and construction debris out of ducts. Similar means shall be used to seal air-side connections of HVAC equipment to include, but not limited to, air handling units, fans, terminal air boxes, fan coil units, cabinet heaters, blower coils, and the like. B. When air terminal devices are installed, contractors shall seal all supply, return, and exhaust grilles with polyethylene film or other airtight protective to keep dust, dirt, and construction debris out of ducts. C. Should HVAC equipment be started during construction, Contractor shall remove airtight protectives and shall install one-inch thick MERV 8 filter media over all return and exhaust grilles to prevent dust, dirt, and construction debris from entering ductwork. Filter media shall cover the entire grille face and shall be secured such that air cannot bypass filter media. D. Should filter media become laden with dust and dirt, Contractor shall replace filter media with new media to prevent damage to air distribution system and equipment. E. The following steps shall be taken during testing, adjusting, and balancing of each air system: 1. All construction activities in all spaces served by the air system shall stop. 2. All airtight protectives and temporary filter media shall be removed from all portions of the air system. 3. Testing, adjusting, and balancing work shall not commence until all construction activity is stopped and all airtight protectives and temporary filter media is removed. 4. Once testing, adjusting, and balancing work is complete for the air system, airtight protectives or temporary filter media shall be installed over all ductwork openings and air terminals on the air system prior to resuming construction activities in any spaces served by the air system. F. The Owner shall agree the building is sufficiently clean prior to the removal of any filtration media and airtight protectives from air terminal devices. 692 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 00 - 24 BASIC HVAC REQUIREMENTS READINESS CERTIFICATION PRIOR TO FINAL JOBSITE OBSERVATION To prevent the final job observation from occurring too early, we require that the Contractor review the completion status of the project and, by copy of this document, certify that the job is indeed ready for the final job observation. The following is a typical list of items that represent the degree of job completeness expected prior to your requesting a final job observation. 1. Penetrations fire sealed and labeled in accordance with specifications. 2. All air handling units operating and balanced. 3. All fans shall be operating and balanced. 4. All miscellaneous mechanical systems (unit heaters, fan coil units, cabinet heaters, etc.) operating. 5. All temperature control systems operating, programmed and calibrated. 6. Pipe insulation complete, pipes labeled and valves tagged. 7. Fire damper and fire/smoke damper access doors labeled in accordance with specifications. Accepted by: Prime Contractor _______________________________________________ By ___________________________________ Date ___________________ Upon Contractor certification that the project is complete and ready for a final job observation, we require the Contractor to sign this agreement and return it to the Architect/Engineer so that the final observation can be scheduled. It is understood that if the Architect/Engineer finds the job not ready for the final observation and that additional trips and observations are required to bring the project to completion, the costs incurred by the Architect/Engineers for additional time and expenses will be deducted from the Contractor's contract retainage prior to final payment at the completion of the job. END OF SECTION 23 05 00 693 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 03 - 1 THROUGH PENETRATION FIRESTOPPING SECTION 23 05 03 THROUGH PENETRATION FIRESTOPPING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Through-Penetration Firestopping. 1.2 QUALITY ASSURANCE A. Manufacturer: Company specializing in manufacturing products specified in this Section. B. Installer: Individuals performing work shall be certified by the manufacturer of the system selected for installation. 1.3 REFERENCES A. UL 263 - Fire Tests of Building Construction and Materials B. UL 723 - Surface Burning Characteristics of Building Materials C. ANSI/UL 1479 - Fire Tests of Through Penetration Firestops D. UL 2079 - Tests for Fire Resistance of Building Joint Systems E. UL Fire Resistance Directory Through Penetration Firestop Systems (XHEZ) F. Intertek / Warnock Hersey - Directory of Listed Products G. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials H. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops I. The Building Officials and Code Administrators National Building Code J. 2019 Uniform Building Code K. NFPA 5000 - Building Construction Safety Code L. CBC California Building Code 1.4 SUBMITTALS A. Submit under provisions of Section 23 05 00. 694 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 03 - 2 THROUGH PENETRATION FIRESTOPPING B. Submit Firestopping Installers Certification for all installers on the project. C. Shop Drawings: Submit for each condition requiring firestopping. Include descriptions of the specific penetrating item, actual wall/floor construction, manufacturer's installation instructions, and UL or Intertek / Warnock Hersey Assembly number. D. Through-Penetration Firestop System Schedule: Indicate locations of each through- penetration firestop system, along with the following information: 1. Types of penetrating items. 2. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated. 3. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency. 4. F ratings for each firestop system. E. Maintain a notebook on the job site at all times that contains copies of approved submittals for all through penetration firestopping to be installed. Notebook shall be made available to the Authority Having Jurisdiction at their request and turned over to the Owner at the end of construction as part of the O&M Manuals. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store, protect and handle products on site. Accept material on site in factory containers and packing. Inspect for damage. Protect from deterioration or damage due to moisture, temperature changes, contaminants, or other causes. Follow manufacturer's instructions for storage. B. Install material prior to expiration of product shelf life. 1.6 PERFORMANCE REQUIREMENTS A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. B. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per UL 1479: 1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated. 2. L-Rated Systems: Provide through-penetration firestop systems with L-ratings of not more than 5.0 cfm/sq. ft at both ambient temperature and 400°F for smoke barriers. C. For through-penetration firestop systems exposed to light, traffic, moisture, or physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. 695 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 03 - 3 THROUGH PENETRATION FIRESTOPPING D. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84. E. For through-penetration firestop systems in air plenums, provide products with flame- spread and smoke-developed indexes of less than 25 and 50, respectively, as determined per ASTM E 84. 1. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 1.7 MEETINGS A. Pre-installation meeting: A pre-installation meeting shall be scheduled and shall include the Construction Manager, General Contractor, all Subcontractors associated with the installation of systems penetrating fire barriers, Firestopping Manufacturer's Representative, and the Owner. 1. Review foreseeable methods related to firestopping work. 2. Tour representative areas where firestopping is to be installed; inspect and discuss each type of condition and each type of substrate that will be encountered, and preparation to be performed by other trades. 1.8 WARRANTY A. Provide one year warranty on parts and labor. B. Warranty shall cover repair or replacement of firestop systems which fail in joint adhesion, cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, general durability, or appear to deteriorate in any manner not clearly specified by the manufacturer as an inherent quality of the material. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Products: Subject to compliance with requirements, provide one of the through- penetration firestop systems indicated for each application that are produced by one of the following manufacturers. All firestopping systems installed shall be provided by a single manufacturer. 1. 3M; Fire Protection Products Division. 2. Hilti, Inc. 3. RectorSeal Corporation, Metacaulk. 696 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 03 - 4 THROUGH PENETRATION FIRESTOPPING 2.2 THROUGH PENETRATION FIRESTOP SYSTEMS A. Provide materials and systems classified by or listed by Intertek / Warnock Hersey to provide firestopping equal to time rating of construction being penetrated. B. All firestopping materials shall be free of asbestos, lead, PCB's, and other materials that would require hazardous waste removal. C. Firestopping shall be flexible to allow for normal penetrating item movement due to expansion and contraction. D. Firestopping systems for plumbing and wet pipe sprinkler piping shall be moisture resistant. E. Provide firestopping systems capable of supporting floor loads where systems are exposed to possible floor loading or traffic. F. Provide firestopping systems allowing continuous insulation for all insulated pipes. G. Provide firestopping systems classified by UL or listed by Intertek / Warnock Hersey for penetrations through all fire rated construction. Firestopping systems shall be selected from the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory Category XHEZ based on substrate construction and penetrating item size and material and shall fall within the range of numbers listed: 1. Combustible Framed Floors and Chase Walls - 1 or 2 Hour Rated: a. F Rating = Floor/Wall Rating Penetrating Item UL System No. No Penetrating Item FC 0000-0999* Metallic Pipe or Conduit FC 1000-1999 Non-Metallic Pipe or Conduit FC 2000-2999 Electrical Cables FC 3000-3999 Cable Trays FC 4000-4999 Insulated Pipes FC 5000-5999 Bus Duct and Misc. Electrical FC 6000-6999 Duct without Damper and Misc. Mechanical FC 7000-7999 Multiple Penetrations FC 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. 697 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 03 - 5 THROUGH PENETRATION FIRESTOPPING 2. Non-Combustible Framed Walls - 1 or 2 Hour Rated: a. F Rating = Wall Rating b. L Rating = Penetrations in Smoke Barriers Penetrating Item UL System No. No Penetrating Item WL 0000-0999* Metallic Pipe or Conduit WL 1000-1999 Non-Metallic Pipe or Conduit WL 2000-2999 Electrical Cables WL 3000-3999 Cable Trays WL 4000-4999 Insulated Pipes WL 5000-5999 Bus Duct and Misc. Electrical WL 6000-6999 Duct without Damper and Misc. Mechanical WL 7000-7999 Multiple Penetrations WL 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. H. Any opening in walls or floors not covered by the listed series of numbers shall be coordinated with the firestopping manufacturer. I. Any openings in floors or walls not described in the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory, or outlined in manufacturer's information shall be sealed in a manner agreed upon by the Firestopping Manufacturer, Owner, and the Authority Having Jurisdiction. PART 3 - EXECUTION 3.1 EXAMINATION A. Ensure all surfaces that contact seal materials are free of dirt, dust, grease, oil, rust, or loose materials. Clean and repair surfaces as required. Remove laitance and form- release agents from concrete. B. Ensure substrate and penetrating items have been permanently installed prior to installing firestopping systems. Ensure penetrating items have been properly spaced and have proper clearance prior to installing firestopping systems. C. Surfaces to which sealing materials are to be installed must meet the selected UL or Intertek / Warnock Hersey system substrate criteria. D. Prime substrates where recommended in writing by through-penetration firestop system manufacturer. Confine primer to area of bond. 698 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 03 - 6 THROUGH PENETRATION FIRESTOPPING 3.2 INSTALLATION A. In existing construction, provide firestopping of openings prior to and after installation of penetrating items. Remove any existing coatings on surfaces prior to firestopping installation. Temporary firestopping shall consist of packing openings with fire resistant mineral wool for the full thickness of substrate, or an alternate method approved by the Authority Having Jurisdiction. All openings shall be temporarily firestopped immediately upon their installation and shall remain so until the permanent UL or listed by Intertek / Warnock Hersey listed firestopping system is installed. B. Install penetration seal materials in accordance with printed instructions of the UL or Intertek / Warnock Hersey Fire Resistance Directory and with the manufacturer's printed application instructions. C. Install dams as required to properly contain firestopping materials within openings and as required to achieve required fire resistance rating. Remove combustible damming after appropriate curing. 3.3 CLEANING AND PROTECTING A. Clean excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not cause damage. B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements. 3.4 IDENTIFICATION A. Provide and install labels adjacent to each firestopping location. Label shall be provided by the firestop system supplier and contain the following information in a contrasting color: 1. The words "Warning - Through Penetration Firestop System - Do Not Disturb. Notify Building Management of Any Damage." 2. Firestop System Supplier; UL or listed by Intertek / Warnock Hersey system number; date installed; contractor name and phone number; manufacturer's representative name, address, and phone number. 3.5 INSPECTION A. All penetrations shall be inspected by the manufacturer's representative to ensure proper installation. B. Access to firestop systems shall be maintained for examination by the Authority Having Jurisdiction at their request. 699 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 03 - 7 THROUGH PENETRATION FIRESTOPPING C. Proceed with enclosing through-penetration firestop system with other construction only after inspection reports are issued and firestop installations comply with requirements. D. The contractor shall allow for visual destructive review of 5% of installed firestop systems (minimum of one) to prove compliance with specifications and manufacturer's instructions and details. Destructive system removal shall be performed by the contractor and witnessed by the Architect/Engineer and manufacturer's factory representative. The Architect/Engineer shall have sole discretion of which firestop system installations will be reviewed. The contractor is responsible for all costs associated with this requirement including labor and material for removing and replacing the installed firestop system. If any firestop system is found to not be installed per manufacturer's specific instructions and details, all firestop systems are subject to destructive review and replacement at the Architect/Engineer's discretion and the contractor's expense. END OF SECTION 23 05 03 700 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 05 - 1 HVAC DEMOLITION FOR REMODELING SECTION 23 05 05 HVAC DEMOLITION FOR REMODELING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Mechanical demolition. B. Cutting and Patching. PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT A. Materials and equipment shall be as specified in individual Sections. PART 3 - EXECUTION 3.1 EXAMINATION A. THE DRAWINGS ARE INTENDED TO INDICATE THE GENERAL SCOPE OF WORK AND DO NOT SHOW EVERY PIPE, DUCT, OR PIECE OF EQUIPMENT THAT MUST BE REMOVED. B. Where walls, ceilings, etc., are shown as being removed on general drawings, the Contractor shall remove all mechanical equipment, devices, fixtures, piping, ducts, systems, etc., from the removed area. C. Where ceilings, walls, partitions, etc., are temporarily removed and replaced by others, This Contractor shall remove, store, and replace equipment, devices, fixtures, pipes, ducts, systems, etc. D. Verify that abandoned utilities serve only abandoned equipment or facilities. Extend services to facilities or equipment that shall remain in operation following demolition. E. Coordinate work with all other Contractors and the Owner. Schedule removal of equipment to avoid conflicts. F. This Contractor shall verify all existing equipment sizes and capacities where equipment is scheduled to be replaced or modified, prior to ordering new equipment. 3.2 DEMOLITION AND EXTENSION OF EXISTING MECHANICAL WORK A. Demolish and extend existing mechanical work under provisions of Division 2 and this Section. 701 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 05 - 2 HVAC DEMOLITION FOR REMODELING B. Remove, relocate, and extend existing installations to accommodate new construction. C. Remove abandoned ducts and piping to source of supply and/or main lines. D. Remove exposed abandoned pipes and ducts, including abandoned pipes and ducts above accessible ceilings. Cut ducts flush with walls and floors, cap duct that remains, and patch surfaces. Cut pipes above ceilings, below floors and behind walls. Cap remaining lines. Repair building construction to match original. Remove all clamps, hangers, supports, etc. associated with pipe and duct removal. E. Disconnect and remove mechanical devices and equipment serving equipment that has been removed. F. Repair adjacent construction and finishes damaged during demolition and extension work. G. Maintain access to existing mechanical installations which remain. Modify installation or provide access panels as appropriate. H. Remove unused sections of supply and return air ductwork back to mains. Patch opening with sheet metal and seal airtight. Patch existing insulation to match existing. Where existing ductwork is to be capped and reused, locate the end cap within 6" of the last branch. End caps shall be 3" pressure class and seal class "A". I. Extend existing installations using materials and methods compatible with existing installations, or as specified. J. Properly reclaim and dispose of all refrigerant in demolished equipment and as required for extension of existing equipment. 3.3 CUTTING AND PATCHING A. This Contractor is responsible for all penetrations of existing construction required to complete the work of this project. Refer to Section 23 05 29 for additional requirements. B. Penetrations in existing construction should be reviewed carefully prior to proceeding with any work. C. Penetrations shall be neat and clean with smooth and/or finished edges. Core drill where possible for clean opening. D. Repair existing construction as required after penetration is complete to restore to original condition. Use similar materials and match adjacent construction unless otherwise noted or agreed to by the Architect/Engineer prior to start of work. E. This Contractor is responsible for all costs incurred in repair, relocations, or replacement of any cables, conduits, or other services if damaged without proper investigation. - 702 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 05 - 3 HVAC DEMOLITION FOR REMODELING 3.4 CLEANING AND REPAIR A. Clean and repair existing materials and equipment which remain or are to be reused. B. Clean all systems adjacent to project which are affected by the dust and debris caused by this construction. C. MECHANICAL ITEMS REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF THE OWNER. CONTRACTOR SHALL PLACE ITEMS RETAINED BY THE OWNER IN A LOCATION COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL DISPOSE OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN FOR MAINTENANCE PURPOSES. END OF SECTION 23 05 05 703 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 13 - 1 MOTORS SECTION 23 05 13 MOTORS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Single Phase and Three Phase Electric Motors. 1.2 REFERENCES A. AFBMA 9 - Load Ratings and Fatigue Life for Ball Bearings. B. AFBMA 11 - Load Ratings and Fatigue Life for Roller Bearings. C. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. D. ANSI/IEEE 112 - Test Procedure for Polyphase Induction Motors and Generators. E. ANSI/NEMA MG 1 - Motors and Generators. F. ANSI/NFPA 70 - National Electrical Code. G. Energy Independence and Security Act of 2007. 1.3 SUBMITTALS A. Submit shop drawings under provisions of Section 23 05 00. Include nominal efficiency and power factor for all premium efficiency motors. Efficiencies must meet or exceed the nominal energy efficiency levels presented below. B. Submit shop drawings for all three phase motors. C. Submit motor data with equipment when motor is installed by the manufacturer at the factory. D. Submit shaft grounding rings or brushes or ceramic bearings for all motors as required. 1.4 DELIVERY, STORAGE, AND HANDLING A. Protect motors stored on site from weather and moisture by maintaining factory covers and suitable weatherproof coverings. For extended outdoor storage, follow manufacturer's recommendations for equipment and motor. 1.5 OPERATION AND MAINTENANCE DATA A. Submit operation and maintenance data including assembly drawings, bearing data including replacement sizes, and lubrication instructions. 704 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 13 - 2 MOTORS 1.6 QUALIFICATIONS A. Manufacturer: Company specializing in the manufacture of commercial and industrial motors and accessories, with a minimum of three years documented manufacturing experience. PART 2 - PRODUCTS 2.1 MOTORS - GENERAL CONSTRUCTION AND REQUIREMENTS A. Refer to the drawings for required electrical characteristics. Voltage is generally specified and scheduled as distribution voltage. Motor submittals may be based on utilization voltage if it corresponds to the correct distribution voltage. Distribution/Nominal Voltage Utilization Voltage 120 115 208 200 240 230 277 265 480 460 B. Design motors for continuous operation in 40ºC environment, and for temperature rise in accordance with ANSI/NEMA MG 1 limits for insulation class, service factor, and motor enclosure type. C. Visible Nameplate: Indicating horsepower, voltage, phase, hertz, RPM, full load amps, locked rotor amps, frame size, manufacturer's name and model number, service factor, power factor, insulation class. D. Electrical Connection: Boxes, threaded for conduit. For fractional horsepower motors where connection is made directly, provide conduit connection in end frame. E. Unless otherwise indicated, motors 3/4 HP and smaller shall be single phase, 60 hertz, open drip-proof or totally enclosed fan-cooled type. F. Unless otherwise indicated, motors 1 HP and larger shall be three phase, 60 hertz, squirrel cage type, NEMA Design Code B (low current in-rush, normal starting torque), open drip-proof or totally enclosed fan-cooled type. G. Each contractor shall set all motors furnished by him. H. All motors shall have a minimum service factor of 1.15. I. All motors shall have ball or roller bearings with a minimum L-10 fatigue life of 150,000 hours in direct-coupled applications and 50,000 hours for belted applications. Belted rating shall be based on radial loads and pulley sizes called out in NEMA MG1-14.43. J. Bearings shall be sealed type for 10 HP and smaller motors. Bearings shall be regreasable type for larger motors. 705 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 13 - 3 MOTORS K. Motor Driven Equipment: 1. No equipment shall be selected or operate above 90% of its motor nameplate rating. Motor size may not be increased to compensate for equipment with efficiency lower than that specified. 2. If a larger motor than specified is required on equipment, the contractor supplying the equipment is responsible for all additional costs due to larger starters, wiring, etc. L. Provide all belted motors with a means of moving and securing the motor to tighten belts. Motors over 2 HP shall have screw type tension adjustment. Motors over 40 HP shall have dual screw adjusters. Slide bases shall conform to NEMA standards. M. Motors for fans and pumps 1/12 HP or greater and less than 1 HP shall be electronically-commutated motors or shall have a minimum motor efficiency of 70% when rated in accordance with DOE 10 CFR 431. These motors shall also have the means to adjust motor speed for either balancing or remote control. Belt-driven fans may use sheave adjustments for airflow balancing in lieu of varying motor speed. 2.2 ELECTRICALLY COMMUTATED MOTORS (ECM) A. Motor shall be variable speed, constant torque, brushless DC motor for direct-drive applications. Electronics shall be encapsulated for moisture protection and shall integral surge protection. Motor shall be pre-wired for specific voltage and phase. B. Motor frame shall be NEMA 48; UL recognized components shall be provided for the motor construction. C. All EC motors shall be a minimum of 85% efficient at all speeds. D. Motors shall be permanently lubricated; utilize ball bearings to match with the connected driven equipment. E. Provide motor with on-board motor control module. Motor speed shall be limited to provide electronic over current protection. Starter shall provide soft start to reduce inrush current and shall be controllable from 20% to 100% of full rated speed. F. Operational mode shall be as scheduled and shall be one of the following: 1. Constant Flow 2. Constant Temperature 3. Constant Pressure 2.3 PREMIUM EFFICIENCY MOTORS (INCLUDING MOST 3-PHASE GENERAL PURPOSE MOTORS) 2.4 SHEAVES A. All sheaves shall conform to NEMA Standard MG1-14.42, which lists minimum diameters and maximum overhangs. Locate motors to minimize overhang. B. When replacing sheaves, use sheaves of at least the originally supplied sizes. 706 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 13 - 4 MOTORS C. Contractor responsible for motor shall also be responsible for replacement sheaves. Coordinate with testing and balancing of the equipment. PART 3 - EXECUTION 3.1 INSTALLATION A. All rotating shafts and/or equipment shall be completely guarded from all contact. Partial guards and/or guards that do not meet all applicable OSHA standards are not acceptable. Contractor is responsible for providing this guarding if it is not provided with the equipment supplied. B. For flexible coupled drive motors, mount coupling to the shafts in accordance with the coupling manufacturer's recommendations. Align shafts to manufacturer's requirements or within 0.002 inch per inch diameter of coupling hub. C. For belt drive motors, mount sheaves on the appropriate shafts per manufacturer's instructions. Use a straight edge to check alignment of the sheaves. Reposition sheaves as necessary so the straight edge contacts both sheave faces squarely. After sheaves are aligned, loosen the adjustable motor base so the belt(s) can be added, and tighten the base so the belt tension is in accordance with the drive manufacturer's recommendations. Frequently check belt tension and adjust if necessary during the first day of operation and again after 80 hours of operation. END OF SECTION 23 05 13 707 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 1 HVAC SUPPORTS AND ANCHORS SECTION 23 05 29 HVAC SUPPORTS AND ANCHORS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Hangers, Supports, and Associated Anchors. B. Equipment Bases and Supports. C. Sleeves and Seals. D. Flashing and Sealing of Equipment and Pipe Stacks. E. Cutting of Openings. F. Escutcheon Plates and Trim. 1.2 REFERENCES A. ANSI/ASME B31.1 - Power Piping. B. MSS SP-58 - Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation. C. MSS SP 69 - Pipe Hangers and Supports - Selection and Application. D. MSS SP 89 - Pipe Hangers and Supports - Fabrication and Installation Practices. E. MSS SP-127 - Bracing for Piping Systems Seismic-Wind-Dynamic Design, Selection, Application 1.3 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 23 05 00. Include plastic pipe manufacturers' support spacing requirements. 1.4 WORK FURNISHED BUT INSTALLED UNDER OTHER SECTIONS A. Furnish sleeves and hanger inserts to General Contractor for placement into formwork. 708 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 2 HVAC SUPPORTS AND ANCHORS PART 2 - PRODUCTS 2.1 HANGER RODS Hanger Rod Diameter Pipe Size Column #1 Column #2 2-1/2" and smaller 3/8" 3/8" 3" through 3-5/8" 3/8" 3/8" 4" and 5" 1/2" 1/2" 6" 3/4" 5/8" 8" through 12" 7/8" 3/4" 14" 1" 7/8" 16" and 18" 1" N/A 20" and 24" 1-1/4" N/A Column #1: Steel pipe. Column #2: Copper, plastic and fiberglass reinforced pipe. A. Rods for double rod hangers may be reduced one size. Minimum rod diameter is 3/8 inches. B. Hanger rods and accessories used in mechanical spaces or otherwise dry areas shall have ASTM B633 electro-plated zinc finish. C. All hanger rods, nuts, washers, clevises, etc., in damp areas shall have ASTM A123 hot-dip galvanized finish applied after fabrication. 2.2 PIPE AND STRUCTURAL SUPPORTS A. General: 1. Pipe hangers, clamps, and supports shall conform to Manufacturers Standardization Society MSS SP-58, 69, 89, and 127 (where applicable). 2. On all insulated piping, provide at each support an insert of same thickness and contour as adjoining insulation, between the pipe and insulation jacket, to prevent insulation from sagging and crushing. Refer to insulation specifications for materials and additional information. B. Vertical Supports: 1. Support and laterally brace vertical pipes at every floor level in multi-story structures, unless otherwise noted by applicable codes, but never at intervals over 15 feet. Support vertical pipes with riser clamps installed below hubs, couplings, or lugs. Provide sufficient flexibility to accommodate expansion and contraction to avoid compromising fire barrier penetrations or stressing piping at fixed takeoff locations. a. Products: 1) Cooper/B-Line Fig B3373 Series 2) Erico 510 Series 709 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 3 HVAC SUPPORTS AND ANCHORS 3) Nibco/Tolco Fig. 82 2. Cold Pipe: Place restrained neoprene mounts beneath vertical pipe riser clamps to prevent sweating of cold pipes. Select neoprene mounts based on the weight of the pipe to be supported. Insulate over mounts. a. Products: 1) Mason RBA, RCA or RDA 2) Mason BR 3. Wall supports shall be used where vertical height of structure exceeds minimum spacing requirements. Install wall supports at same spacing as hangers or strut supports along vertical length of pipe runs. Wall supports shall be coordinated with the Structural Engineer of record C. Hangers and Clamps: 1. Oversize all hangers, clamps, and supports on insulated piping to allow insulation and jacket to pass through unbroken. This applies to both hot and cold pipes. 2. Hangers in direct contact with bare copper pipe shall include plastic pipe insert similar to Unistrut Cush-A-Clamp, Hydra-Zorb, Erico Cushion Clamp or Cooper Vibra-Clamp within their temperature limits of -65°F to +275°F. 3. On all insulated piping, provide a semi-cylindrical metallic shield and vapor barrier jacket. a. Products: 1) Anvil Fig. 160, 161, 162, 163, 164, 165 2) Cooper/B-Line Fig. 3160, 3161, 3162, 3163, 3164, 3165 3) Erico Model 630, 631, 632, 633, 634, 635 4) Nibco/Tolco Fig. 260-1, 261-1 1/2, 262-2, 263-2 1/2, 264-3, 265-4 4. Unless otherwise indicated, hangers shall be as follows: a. Clevis Type: Service: Bare Metal Pipe, Rigid Plastic Pipe, Insulated Cold Pipe, Insulated Hot Pipe - 3 inches and Smaller: 1) Products: Bare Steel, Plastic or Insulated Pipe: a) Anvil Fig. 260 b) Cooper/B-Line Fig. 3100 c) Erico Model 400 d) Nibco/Tolco Fig. 1 2) Products: Bare Copper Pipe: a) Cooper/B-Line Fig. B3100C b) Nibco/Tolco Fig. 81PVC 710 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 4 HVAC SUPPORTS AND ANCHORS b. Adjustable Swivel Ring Type: Service: Bare Metal Pipe - 4 inches and Smaller: 1) Products: Bare Copper Pipe: a) Cooper/B-Line Fig. B3170CTC b) Erico 102A0 Series c) Nibco/Tolco Fig. 203 5. Support may be fabricated from U-channel strut or similar shapes. Piping less than 4" in diameter shall be secured to strut with clamps of proper design and capacity as required to maintain spacing and alignment. Strut shall be independently supported from hanger drops or building structure. Size and support shall be per manufacturer's installation requirements for structural support of piping. Clamps shall not interrupt piping insulation. a. Strut used in mechanical spaces or otherwise dry areas shall have ASTM B633 electro-plated zinc finish. b. Strut used in damp areas listed in hanger rods shall have ASTM A123 hot- dip galvanized finish applied after fabrication. 6. Unless otherwise indicated, pipe supports for use with struts shall be as follows: a. Clamp Type: Service: Bare Metal Pipe, Rigid Plastic Pipe, Insulated Cold Pipe, Insulated Hot Pipe - 3 inches and smaller: 1) Clamps in direct contact with copper pipe shall include plastic pipe insert similar to Unistrut Cush-A-Clamp, Hydra-Zorb, Erico Cushion Clamp or Cooper Vibra-Clamp. 2) Pipes subject to expansion and contraction shall have clamps oversized to allow limited pipe movement. 3) Products: Bare Steel, Plastic or Insulated Pipe: a) Unistrut Fig. P1100 or P2500 b) Cooper/B-Line Fig. B2000 or B2400 c) Nibco/Tolco Fig. A-14 or 2STR 4) Products: Bare Copper Pipe: a) Cooper/B-Line Fig. BVT D. Upper (Structural) Attachments: 1. Unless otherwise shown, upper attachments for hanger rods or support struts shall be as follows: a. Wood Anchors: Tension wood rod hanger for suspending 3/8" threaded rod. Zinc plated carbon steel. 711 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 5 HVAC SUPPORTS AND ANCHORS 1) Minimum allowable tension loads for Douglass Fir/Southern Pine: a) 3/8" diameter rod; 2-1/2" shank: 600 lb/590 lb. b) Load values are based on full shank penetration into wood member. Minimum edge distance 3/4". Minimum end distance 3-1/4". 2) Limitations: a) Truss: Do not hang from wood trusses without truss manufacturer or Structural Engineers approval. b) Sheetrock/Gypsum Ceiling: When drilling through non-wood materials (e.g., sheet rock, gypsum, etc.), increase shank length by depth of non-wood materials. c) Plywood Flooring/Roofing: Do not hang from plywood floor or roofing. d) Spacing: Refer to wood structure spacing of hangers. 3) Products: a) Simpson RWV b) DeWALT c) ITI Sammys GT25 2.3 FOUNDATIONS, BASES, AND SUPPORTS A. Supports: 1. Provide sufficient clips, inserts, hangers, racks, rods, and auxiliary steel to securely support all suspended material, equipment and conduit without sag. 2.4 OPENINGS IN FLOORS, WALLS AND CEILINGS A. Exact locations of all openings for the installation of materials shall be determined by the Contractor and given to the General Contractor for installation or construction as the structure is built. B. Coordinate all openings with other Contractors. C. Hire the proper tradesman and furnish all labor, material and equipment to cut openings in or through existing structures, or openings in new structures that were not installed, or additional openings. Repair all spalling and damage to the satisfaction of the Architect/Engineer. Make saw cuts before breaking out concrete to ensure even and uniform opening edges. D. Said cutting shall be at the complete expense of each Contractor. Failure to coordinate openings with other Contractors shall not exempt the Contractor from providing openings at Contractor's expense. E. Do not cut structural members without written approval of the Architect or Structural Engineer of record. 712 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 6 HVAC SUPPORTS AND ANCHORS 2.5 ROOF PENETRATIONS A. Roof Curb Enclosure: Provide weatherproof roof curb and enclosure for pipe and penetrations. Refer to drawings for details. B. Break insulation only at the clamp for pipes between 60°F and 150°F. Seal outdoor insulation edges watertight. 2.6 ESCUTCHEON PLATES AND TRIM A. Fit escutcheons to all insulated or uninsulated exposed pipes passing through walls, floors, or ceilings of finished rooms. B. Escutcheons shall be heavy gauge, cold rolled steel, copper coated under a chromium plated finish, heavy spring clip, rigid hinge and latch. C. Install galvanized steel (unless otherwise indicated) trim strip to cover vacant space and raw construction edges of all rectangular openings in finished rooms. This includes pipe openings. 2.7 PIPE PENETRATIONS A. Seal all pipe penetrations. Seal non-rated walls and floor penetrations with grout or caulk. Backing material may be used. B. Seal fire rated wall and floor penetrations with fire seal system as specified. 2.8 PIPE ANCHORS A. Provide all items needed to allow adequate expansion and contraction of all piping. All piping shall be supported, guided, aligned, and anchored as required. B. Repair all piping leaks and associated damage. Pipes shall not rub on any part of the building. PART 3 - EXECUTION 3.1 HVAC SUPPORTS AND ANCHORS A. General Installation Requirements: 1. Install all items per manufacturer's instructions. 2. Coordinate the location and method of support of piping systems with all installations under other Divisions and Sections of the Specifications. 3. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welding. 4. Supports shall extend directly to building structure. Do not support piping from duct hangers unless coordinated with sheet metal contractor prior to installation. Do not allow lighting or ceiling supports to be hung from piping supports. 713 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 7 HVAC SUPPORTS AND ANCHORS B. Supports Requirements: 1. Install hangers and supports complete with lock nuts, clamps, rods, bolts, couplings, swivels, inserts and required accessories. 2. Hangers for horizontal piping shall have adequate means of vertical adjustment for alignment. C. Pipe Requirements: 1. Support all piping and equipment, including accessories to avoid objectionable or excessive stress, deflection, swaying, sagging or vibration in the piping or building structure during erection, cleaning, testing and normal operation of the systems. 2. Do not, however, restrain piping to cause it to snake or buckle between supports or to prevent proper movement due to expansion and contraction. 3. Support piping at equipment and valves so they can be disconnected and removed without further supporting the piping. 4. Piping shall not introduce strains or distortion to connected equipment. 5. Parallel horizontal pipes may be supported on trapeze hangers made of structural shapes and hanger rods; otherwise, pipes shall be supported with individual hangers. 6. Provide additional supports where pipe changes direction, adjacent to flanged valves and strainers, at equipment connections and heavy fittings. 7. Provide at least one hanger adjacent to each joint in grooved end steel pipe with mechanical couplings. D. Provided the installation complies with all loading requirements of truss and joist manufacturers, the following practices are acceptable: 1. Loads of 100 lbs. or less may be attached anywhere along the top or bottom chords of trusses or joists with a minimum 3' spacing between loads. 2. Loads greater than 100 lbs. must be hung concentrically and may be hung from top or bottom chord, provided one of the following conditions is met: a. The hanger is attached within 6" from a web/chord joint. b. Additional L2x2x1/4 web reinforcement is installed per manufacturer's requirements. 3. It is prohibited to cantilever a load using an angle or other structural component that is attached to a truss or joist in such a fashion that a torsional force is applied to that structural member. 4. If conditions cannot be met, coordinate installation with truss or joist manufacturer and contact Architect/Engineer. E. After piping and insulation installation are complete, cut hanger rods back at trapeze supports so they do not extend more than 3/4" below bottom face of lowest fastener and blunt any sharp edges. F. Do not exceed the manufacturer's recommended maximum load for any hanger or support. 714 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 29 - 8 HVAC SUPPORTS AND ANCHORS 1. Hard Drawn Copper & Brass (Liquid Service): a. Maximum Spacing: 1) 3/4" and under: 5'-0" 2) 1": 6'-0" 3) 1-1/4": 7'-0" 4) 1-1/2" 8'-0" 2. Hard Drawn Copper & Brass (Vapor Service): a. Maximum Spacing: 1) 3/4" & under: 7'-0" 2) 1": 8'-0" 3) 1-1/4": 9'-0" 4) 1-1/2": 10'-0" END OF SECTION 23 05 29 715 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 53 - 1 HVAC IDENTIFICATION SECTION 23 05 53 HVAC IDENTIFICATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Identification of products installed under Division 23. 1.2 REFERENCES A. ANSI/ASME A13.1 - Scheme for the Identification of Piping Systems. B. ASTM B-1, B-3, and B-8 for copper conductors. C. ASTM D-1248 for Polyethylene Extrusion Materials, ICEA S-70-547 Weatherproof Resistant Polyethylene Conductors, ICEA S-61-402/NEMA WC5 Thermoplastic Insulated Wire & Cable, ICEA S-95-658/NEMA WC70 Non-Shielded 0 - 2kV Cables. D. CGA Pamphlet C-9, Standard Color-Marking of Compressed Gas Cylinders for Medical Use. E. NFPA-99 - Health Care Facilities. F. UL 1581 Standard for Electrical Wires, Cables, and Flexible Cords. 1.3 SUBMITTALS A. Submit shop drawings under provisions of Section 23 05 00. Include list of items identified, wording, letter sizes, and color coding. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. 3M B. Bunting C. Craftmark 2.2 MATERIALS A. Aluminum Nameplates: Black enamel background with natural aluminum border and engraved letters furnished with two mounting holes and screws. 716 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 53 - 2 HVAC IDENTIFICATION B. Ductwork Markers: 1. Vinyl Markers: Colored vinyl with permanent pressure sensitive adhesive backing suitable for indoor and outdoor application. C. Ceiling Markers: 1. Label Style: a. The intent is for the ceiling labels to be inconspicuous but easy to find and read while standing underneath. The labels shall be located on the grid T- bar nearest the ceiling tile that can be removed to provide the best access to the serviceable side of equipment or to valves. An arrow can be used to point to the tile needing removal. b. The label tape shall be approximately 1/2" wide with all capitalized letters approximately 3/16" tall. c. Ceiling grid labels shall be made with a label maker with durable adhesive labels having a clear background and black letters. d. Equipment labels shall be as designated on the drawings (e.g., FCU-606B, etc.). PART 3 - EXECUTION 3.1 INSTALLATION A. Install all products per manufacturer's recommendations. B. Degrease and clean surfaces to receive adhesive for identification materials. C. Equipment: 1. All equipment not easily identifiable such as controls, relays, gauges, etc.; and all equipment in an area remote from its function such as air handling units, exhaust fans, filters, reheat coils, dampers, etc.; shall have nameplates or plastic tags listing name, function, and drawing symbol. Do not label exposed equipment in public areas. 2. Fasten nameplates or plastic tags with stainless steel self-tapping screws or permanently bonding cement. 3. Mechanical equipment that is not covered by the U.S. National Appliance Energy Conservation Act (NAECA) of 1987 shall carry a permanent label installed by the manufacturer stating that the equipment complies with the requirements of ASHRAE 90.1. D. Miscellaneous: 1. Attach self-adhesive vinyl labels at all duct access doors used to reset fusible links or actuators on fire, fire/smoke, or smoke dampers. Lettering shall be a minimum of 1/2" high. Labels shall indicate damper type. 2. Provide engraved plastic tags at all hydronic or steam system make-up water meters. 717 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 53 - 3 HVAC IDENTIFICATION 3.2 SCHEDULE A. Pipes to be marked shall be labeled with text as follows, regardless of which method or material is used: 1. REFRIGERANT LIQUID: White lettering; purple background 2. REFRIGERANT SUCTION: White lettering; purple background 3. REFRIGERANT HOT GAS: White lettering; purple background END OF SECTION 23 05 53 718 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 1 TESTING, ADJUSTING, AND BALANCING SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Testing, adjusting, and balancing of air systems. B. Testing, adjusting, and balancing of heating systems. C. Testing, adjusting, and balancing of cooling systems. D. Measurement of final operating condition of HVAC systems. 1.2 QUALITY ASSURANCE A. Agency shall be a company specializing in the adjusting and balancing of systems specified in this section with minimum three years' experience. Perform work under supervision of AABC Certified Test and Balance Engineer, NEBB Certified Testing, Balancing and Adjusting Supervisor, SMARTA Certified Air and Hydronic Balancer, or TABB Certified Supervisor. B. Work shall be performed in accordance with the requirements of the references listed at the start of this section. 1.3 REFERENCES A. AABC - National Standards for Total System Balance, Seventh Edition. B. ADC - Test Code for Grilles, Registers, and Diffusers. C. AMCA - Publication 203-90; Field Performance Measurement of Fan Systems. D. ASHRAE - 2019 HVAC Applications Handbook; Chapter 39, Testing, Adjusting and Balancing. E. ASHRAE/ANSI - Standard 111-2008; Practices for Measurement, Testing, Adjusting and Balancing of Building HVAC&R Systems. F. NEBB - Procedural Standards for Testing, Adjusting and Balancing of Environmental Systems, Ninth Edition, 2019. G. SMACNA - HVAC Systems; Testing, Adjusting and Balancing, Third Edition, 2002. H. TABB - International Standards for Environmental Systems Balance. 719 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 2 TESTING, ADJUSTING, AND BALANCING 1.4 SUBMITTALS A. Submit copies of report forms, balancing procedures, and the name and qualifications of testing and balancing agency for approval within 30 days after award of Contract. B. Electronic Copies: 1. Submit a certified copy of test reports to the Architect/Engineer for approval. Electronic copies shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Copies that are not legible will be returned to the Contractor for resubmittal. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 2. Electronic file size shall be limited to a maximum of 10MB. Larger files shall be divided into files that are clearly labeled as "1 of 2", "2 of 2", etc. 3. All text shall be searchable. 4. Bookmarks shall be used. All bookmark titles shall be an active link to the index page and index tabs. 1.5 REPORT FORMS A. Submit reports on AABC, SMACNA or NEBB forms. Use custom forms approved by the Architect/Engineer when needed to supply specified information. B. Include in the final report a schematic drawing showing each system component, including balancing devices, for each system. Each drawing shall be included with the test reports required for that system. The schematic drawings shall identify all testing points and cross-reference these points to the report forms and procedures. C. Refer to PART 4 for required reports. 1.6 WARRANTY/GUARANTEE A. The TAB Contractor shall include an extended warranty of 90 days after owner receipt of a completed balancing report, during which time the Owner may request a recheck of terminals, or resetting of any outlet, coil, or device listed in the test report. This warranty shall provide a minimum of 24 manhours of onsite service time. If it is determined that the new test results are not within the design criteria, the balancer shall rebalance the system according to design criteria. B. Warranty/Guarantee must meet one of the following programs: TABB International Quality Assurance Program, AABC National Project Performance Guarantee, NEBB's Conformance Certification. 1.7 SCHEDULING A. Coordinate schedule with other trades. Provide a minimum of seven days' notice to all trades and the Architect/Engineer prior to performing each test. B. Project will be constructed in phases. Provide balancing report after each phase is complete. 720 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 3 TESTING, ADJUSTING, AND BALANCING PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 GENERAL REQUIREMENTS A. All procedures must conform to a published standard listed in the References article of this section. All equipment shall be adjusted in accordance with the manufacturer's recommendations. Any system not listed in this specification but installed under the contract documents shall be balanced using a procedure from a published standard listed in the References article. B. The Balancing Contractor shall incorporate all pertinent documented construction changes (e.g. submittals/shop drawings, change orders, RFIs, ASIs, etc.) and include in the balancing report. C. Recorded data shall represent actual measured or observed conditions. D. Cut insulation, ducts, pipes, and equipment cabinets for installation of test probes to the minimum extent necessary to allow adequate performance of procedures. After testing and balancing is complete, close probe holes and patch insulation with new materials as specified. Restore vapor barrier and finish as specified. E. Permanently mark setting of valves, dampers, and other adjustment devices allowing for settings to be restored. Set and lock memory stops. F. Leave systems in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, plugging test holes, and restoring thermostats to specified settings. G. The Balancing Contractor shall measure terminal air box air flow, and the TCC shall adjust DDC readout to match. Refer to Section 23 09 00 for additional information. H. Installations with systems consisting of multiple components shall be balanced with all system components operating. 3.2 EXAMINATION A. Before beginning work, verify that systems are complete and operable. Ensure the following: 1. General Equipment Requirements: a. Equipment is safe to operate and in normal condition. b. Equipment with moving parts is properly lubricated. c. Temperature control systems are complete and operable. d. Proper thermal overload protection is in place for electrical equipment. e. Direction of rotation of all fans and pumps is correct. f. Access doors are closed and end caps are in place. 721 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 4 TESTING, ADJUSTING, AND BALANCING 2. Duct System Requirements: a. All filters are clean and in place. If required, install temporary media. b. Duct systems are clean and free of debris. c. Fire/smoke and manual volume dampers are in place, functional and open. d. Air outlets are installed and connected. e. Duct system leakage has been minimized. B. Report any defects or deficiencies to Architect/Engineer. C. Promptly report items that are abnormal or prevent proper balancing. D. If, for design reasons, system cannot be properly balanced, report as soon as observed. E. Beginning of work means acceptance of existing conditions. 3.3 PREPARATION A. Provide instruments required for testing, adjusting, and balancing operations. Make instruments available to the Architect/Engineer for spot checks during testing. B. Instruments shall be calibrated within six months of testing performed for project, or more recently if recommended by the instrument manufacturer. 3.4 INSTALLATION TOLERANCES A. ± 10% of scheduled values: 1. Adjust air inlets and outlets to ± 10% of scheduled values. 2. Adjust piping systems to ±10% of design values. 3.5 ADJUSTING A. After adjustment, take measurements to verify balance has not been disrupted or that disruption has been rectified. B. Once balancing of systems is complete, at least one damper or valve must be 100% open. C. After testing, adjusting and balancing are complete, operate each system and randomly check measurements to verify system is operating as reported in the report. Document any discrepancies. D. Contractor responsible for each motor shall also be responsible for replacement sheaves. Coordinate with contractor. E. Contractor responsible for pump shall trim impeller to final duty point as instructed by this contractor on all pumps not driven by a VFD. Coordinate with contractor. 722 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 5 TESTING, ADJUSTING, AND BALANCING 3.6 SYSTEM PERFORMANCE REPORT A. After the conclusion of balancing operations, utilize the building DDC system or install portable data loggers to simultaneously record temperatures and humidity during summer and winter conditions for a seven-day period, continuous over a weekend, and including at least one period of operation at outside conditions within 5°F wet bulb temperature of maximum summer design condition and within 10°F dry bulb temperature of minimum winter design condition. B. Architect/Engineer will direct all test locations. C. Report of test results shall include original recording and three reproductions. 3.7 SUBMISSION OF REPORTS A. Fill in test results on appropriate forms. PART 4 - SYSTEMS TO BE TESTED, ADJUSTED AND BALANCED 4.1 Verification of existing systems. A. Perform a pre-balance of systems serving the area of construction prior to the start of any other work. Do not make adjustments to the systems. If the systems are not operating at maximum capacity, temporarily drive system to maximum and take readings for the system. Return the system to its original state when measurements are complete. 1. Air Handling Unit: a. General Requirements: 1) Existing Equipment Tag (if available). 2) Location. 3) Manufacturer, model, arrangement, class, discharge. 4) Fan RPM. b. Flow Rate: 1) Supply flow rate (cfm) 2) Return flow rate (cfm) 3) Outside flow rate (cfm) c. Pressure Drop and Pressure: 1) Filter pressure drop. 2) Total static pressure. (Indicate if across fan or external to unit). 3) Inlet pressure. 4) Discharge pressure. 723 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 6 TESTING, ADJUSTING, AND BALANCING 2. Exhaust Fan a. Drawing symbol. b. Location. c. Manufacturer and model. d. Flow rate (cfm). e. Total static pressure. (Indicate measurement locations). f. Inlet pressure. g. Discharge pressure. h. Fan RPM. 3. Air Terminal (Inlet or Outlet): a. Room number/location. b. Terminal type and size. c. Velocity. d. Flow rate (cfm) B. Report findings to Architect/Engineer on standard forms. Provide four (4) copies of report. 4.2 GENERAL REQUIREMENTS A. Title Page: 1. Project name. 2. Project location. 3. Project Architect. 4. Project Engineer (IMEG Corp.). 5. Project General Contractor. 6. TAB Company name, address, phone number. 7. TAB Supervisor's name and certification number. 8. TAB Supervisor's signature and date. 9. Report date. B. Report Index C. General Information: 1. Test conditions. 2. Nomenclature used throughout report. 3. Notable system characteristics/discrepancies from design. 4. Test standards followed. 5. Any deficiencies noted. 6. Quality assurance statement. D. Instrument List: 1. Instrument. 2. Manufacturer, model, and serial number. 3. Range. 724 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 7 TESTING, ADJUSTING, AND BALANCING 4. Calibration date. 4.3 AIR SYSTEMS A. Duct Leakage Test: 1. Air system and fan. 2. Leakage class. 3. Test pressure. 4. Construction pressure. 5. Flow rate (cfm): specified and actual. 6. Leakage (refer to Section 23 31 00 in the specifications): specified and actual. 7. Statement that fire dampers, reheat coils and other accessories were included in the test. 8. Pass or Fail. B. Air Moving Equipment: 1. General Requirements: a. Drawing symbol. b. Location. c. Manufacturer, model, arrangement, class, discharge. d. Fan RPM. e. Multiple RPM fan curve with operating point marked. (Obtain from equipment supplier). 2. Flow Rate: a. Supply flow rate (cfm): specified and actual. b. Return flow rate (cfm): specified and actual. c. Outside flow rate (cfm): specified and actual. 3. Pressure Drop and Pressure: a. Filter pressure drop: specified and actual. b. Total static pressure: specified and actual. (Indicate if across fan or external to unit). c. Inlet pressure. d. Discharge pressure. C. Fan Data: 1. Drawing symbol. 2. Location. 3. Manufacturer and model. 4. Flow rate (cfm): specified and actual. 5. Total static pressure: specified and actual. (Indicate measurement locations). 6. Inlet pressure. 725 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 05 93 - 8 TESTING, ADJUSTING, AND BALANCING D. Electric Motors: 1. Drawing symbol of equipment served. 2. Manufacturer, Model, Frame. 3. Nameplate: HP, phase, service factor, RPM, operating amps, efficiency. 4. Measured: Amps in each phase. E. Air Terminal (Inlet or Outlet): 1. Drawing symbol. 2. Terminal type and size. 3. Velocity: specified and actual. 4. Flow rate (cfm): specified and actual. 5. Percent of design flow rate. END OF SECTION 23 05 93 726 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 13 - 1 DUCTWORK INSULATION SECTION 23 07 13 DUCTWORK INSULATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Ductwork Insulation. B. Insulation Jackets. 1.2 QUALITY ASSURANCE A. Applicator: Company specializing in ductwork insulation application with five years minimum experience. When requested, installer shall submit manufacturer's certificate indicating qualifications. B. Materials: 1. Listed and labeled for flame spread/smoke developed rating of no more than 25/50 when tested per ASTM E84 or UL 723 as required by code. 2. Fungal Resistance: No growth when tested in accordance with ASTM G21 (antifungal test). 3. Rated velocity on coated air side for air erosion in accordance with UL 181 at 5,000 fpm minimum. 4. UL listed in Category HNKT. C. Adhesives: UL listed, meeting NFPA 90A/90B requirements. 1.3 REFERENCES A. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. B. ANSI/ASTM C553 - Mineral Fiber Blanket and Felt Insulation. C. ANSI/ASTM C612 - Mineral Fiber Block and Board Thermal Insulation. D. ASTM E84 - Surface Burning Characteristics of Building Materials. E. ASTM E136 - Standard Test Method for the Behavior of Materials in a Vertical Tube Furnace at 750°C. F. ASTM E814 - Fire Tests of Through Penetrations Firestops. G. ASTM E2336-04 - Standard Test Methods for Fire Resistive Grease Duct Enclosure Systems. 727 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 13 - 2 DUCTWORK INSULATION H. ASTM G21 - Standard Practice for Determining Resistance of Synthetic Polymeric Materials to Fungi. I. National Commercial & Industrial Insulation Standards - 1999 Edition - as published by Midwest Insulation Contractors Association and endorsed by National Insulation Contractors Association. J. NFPA 96 - Standard for the Installation of Equipment for Removal of Smoke and Grease-Laden Vapors from Commercial Cooking Equipment. K. NFPA 255 - Surface Burning Characteristics of Building Materials. L. UL - XHEZ - Through Penetration Firestop Systems. M. UL 181 - Standard for Factory-Made Air Ducts and Air Connectors. N. UL 263 - Full Scale External Fire Tests with Hose Stream. O. UL 723 - Surface Burning Characteristics of Building Materials. P. UL 1479 - Fire Tests of Through Penetrations Firestops. Q. California Title 24 - Building Energy Efficiency Standards R. CMC California Mechanical Code 1.4 SUBMITTALS A. Submit shop drawings per Section 23 05 00. Include product description, list of materials and thickness for each service, and location. B. Submit manufacturer's installation instructions. PART 2 - PRODUCTS 2.1 MATERIALS A. Type A: Flexible Fiberglass - Outside Wrap; ANSI/ASTM C553; commercial grade; 0.28 / 0.26 (Out-Of-Package/Installed-Compressed 25%) maximum 'K' value at 75°F; foil scrim Kraft facing, 1.0 lb./cu. ft. density. Submit both "Out of Package" and "Installed-Compressed 25%" K and R-values. B. Type C: Flexible Fiberglass Liner; ANSI/ASTM C1071; 0.28 maximum 'K' value at 75°F; 1.5 lb/cu ft minimum density; coated air side for 5000 fpm air velocity. C. Type D: Rigid Fiberglass Liner; 0.23 maximum 'K' value at 75°F; smooth coated mat facing laminated to the insulation, suitable for 5000 fpm air side velocity. 728 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 13 - 3 DUCTWORK INSULATION R-VALUE PER THICKNESS THICKNESS 0.5 1 1.5 2 2.5 3 4 5 TYPE K-FACTOR R-VALUE Flexible Fiberglass Outside Wrap 0.28 5.4 7.1 8.9 10.7 14.3 17.9 Semi-Rigid Fiberglass Board Wrap 0.25 6.0 8.0 10.0 12.0 16.0 20.0 Flexible Fiberglass Liner 0.28 1.8 3.6 5.4 7.1 8.9 10.7 14.3 17.9 Rigid fiberglass liner 0.23 4.3 6.5 8.7 10.9 13.0 17.4 21.7 Double Wall Ductwork 0.27 3.7 5.6 7.4 9.3 11.1 14.8 18.5 Flexible High Temp Rigid Preformed Fiberglass Acoustical Liner 0.23 4.3 6.5 8.7 10.9 13.0 17.4 21.7 2.2 JACKETS A. Vapor Barrier Jackets: Kraft reinforced foil scrim vapor barrier with self-sealing adhesive joints. Beach puncture resistance ratio of at least 25 units. Tensile strength: 35 psi minimum. Single, self-seal acrylic adhesive on longitudinal jacket laps and butt strips. 2.3 JACKET COVERINGS A. Aluminum Jackets: ASTM B209; 0.016" thick; smooth or embossed stucco finish with Z edge seams and aluminum bands for outdoor use. Where colored jacket covers are called for, provide factory-applied hard film acrylic paint in color selected by Architect. B. Laminated flexible aluminum, self-adhering, protective jacketing, vapor barrier and weather proofing membrane with having high-performance adhesive capable of installation with no additional mechanical attachment. Owner/Architect shall select from manufacturer's standard finishes. 1. Acceptable Manufacturers: a. VentureClad 1577CW b. Polyguard Alumaguard PART 3 - EXECUTION 3.1 INSTALLATION A. Install materials in accordance with manufacturer's instructions, codes, and industry standards. B. Install materials after ductwork has been tested. 729 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 13 - 4 DUCTWORK INSULATION C. Clean surfaces for adhesives. D. Provide insulation with vapor barrier when air conveyed may be below ambient temperature. E. Exterior Duct Wrap - Flexible, Type A: 1. Apply with edges tightly butted. 2. Cut slightly longer than perimeter of duct to insure full thickness at corners. Do not wrap excessively tight. 3. Seal joints with adhesive backed tape. 4. Apply so insulation conforms uniformly and firmly to duct. 5. Seal all penetrations of the vapor barrier by strap hangers or slip cable hangers with adhesive backed tape. 6. Provide high-density insulation inserts on rectangular ducts at trapeze duct hangers to prevent crushing of insulation. Provide high-density insulation inserts with clamp-on round ducts requiring two (2) rods or straps to prevent crushing of insulation. Maintain continuous vapor barrier through the hanger. 7. Tape all joints with Royal Tapes #RT 350 (216-439-7229), Venture Tape 1525CW, or Compac Type FSK. No substitutions will be accepted without written permission from the Architect/Engineer. 8. Press tape tightly to the duct covering with a squeegee for a tight continuous seal. Fish mouths and loose tape edges are not acceptable. 9. Staples may be used, but must be covered with tape. 10. Vapor barrier must be continuous. 11. Mechanically fasten on 12" centers at bottom of ducts over 24" wide and on all sides of vertical ducts. F. Interior Insulation - Flexible Duct Liner, Type C: 1. Observation of Duct Lining: a. After installation of ductwork, Architect/Engineer may select random observation points in each system. 1) At each observation point, cut and remove an 18" x 18" section of ductwork and liner for verification of installation. 2) Random observation points based on one opening per 75 lineal ft. of total duct run. b. When any of the observation points shows non-compliance, additional points will be designated by the Architect/Engineer, and observation repeated. c. If 20% of points observed do not comply, remove and replace all lined ducts and repeat tests. Where replacement is not required, correct all non- compliances. d. At end of observation, repair all duct lining and observation holes by installing standard, insulated, hinged access doors per Section 23 33 00. e. Paint or finish to match adjacent duct surfaces. 730 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 13 - 5 DUCTWORK INSULATION 2. Impale on spindle anchors welded or mechanically fastened to the duct. Adhesive or glue fastened anchors are not acceptable. Maximum anchor spacing per SMACNA Duct Construction Standards or manufacturer's recommendations, whichever is more restrictive. Locate pins less than 3" from corners and at intervals not over 6" around the perimeter at leading and trailing edges. Locate pins within 3" of transverse joints and at intervals not over 16" long the length of the duct. Pins must be long enough to prevent compressing the insulation. 3. In addition to anchors, secure liner with UL listed adhesive covering over 90% of the duct surface. 4. Install per the latest edition of the SMACNA Manual. 5. Leading edges shall be covered as follows: a. For duct velocities below 3000 fpm, coat leading edges with adhesive. Neatly butt liner without gaps at transverse joints. Cut liner flush with end of the duct section for tight joints with no exposed duct. If adhesive is shop installed, field apply additional adhesive to the end of each duct section for complete adhesion of the liner. Protect edges from dirt and debris. b. For duct velocities above 3000 fpm, cover leading edges with metal nosing. Use nosing on upstream edges of each section of duct. If the duct can be installed in either direction, provide nosing on each end or clearly mark the duct to allow visual verification after installation. Verify duct velocities based on the scheduled air flow rates and determine where metal nosing is required. c. Install metal nosing in the following locations (regardless of velocity): 1) The first three fittings downstream of all fans. 2) At all duct liner interruptions. This includes fire dampers, access doors, branch connections, and all other locations where the edge of the liner is exposed. 3) Trailing edges of transverse joints do not require metal nosings. 6. Overlap liner at longitudinal joints. Make longitudinal joints at corners of the duct unless the duct size does not allow this. Coat longitudinal joints with adhesive at velocities over 2500 fpm. 7. Seal all damaged duct liner with adhesive and glass cloth. Do not damage duct liner surface coatings. 8. Duct dimensions given are net inside dimensions. Increase sheet metal to allow for insulation thickness. G. Plenum Walls - Type D: 1. Brush apply adhesive to the wall before installing insulation. Provide 100% coverage. 2. Apply pins to the wall with adhesive. Locate pins 15" O.C. maximum and within 2" of all insulation edges. 3. Secure insulation to pins with speed clips and cut all pins off close to the clips. Cover raw ends of pins with glass fabric set in adhesive. 4. Cover all joints with 3" wide strips of glass fabric set in adhesive. 5. Protect all door openings with sheet metal angles. H. Continue insulation with vapor barrier through penetrations unless code prohibits. 731 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 13 - 6 DUCTWORK INSULATION I. Provide 2" wide, 24" high, 26 gauge, galvanized sheet metal corner protection angles for all externally insulated ductwork extending to a floor or curb. 3.2 SCHEDULE A. Refer to Section 23 31 00 for scheduling of insulation. B. Unless noted otherwise, HVAC plenums and unit housings not pre-insulated at factory shall be insulated to geographical R-value requirements based on California Title 24, R-4.2, R-6 or R-8. END OF SECTION 23 07 13 732 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 19 - 1 HVAC PIPING INSULATION SECTION 23 07 19 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Piping Insulation. B. Insulation Jackets. 1.2 QUALITY ASSURANCE A. Applicator: Company specializing in piping insulation application with five years minimum experience. B. Materials: Listed and labeled for flame spread/smoke developed rating of no more than 25/50 when tested per ASTM E84 or UL 723 as required by code. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers with appropriate markings of applicable testing agency. C. Products shall not contain asbestos, lead, mercury, or mercury compounds. D. Products that come in contact with stainless steel shall have a leachable chloride content of less than 50 ppm when tested according to ASTM C 871. Insulation materials for use on austenitic stainless steel shall be qualified as acceptable according to ASTM C 795. E. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process. F. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 1.3 REFERENCES A. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. B. ANSI/ASTM C195 - Mineral Fiber Thermal Insulation Cement. C. ANSI/ASTM C533 - Calcium Silicate Block and Pipe Thermal Insulation. D. ANSI/ASTM C534 - Elastomeric Foam Insulation. 733 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 19 - 2 HVAC PIPING INSULATION E. ANSI/ASTM C547 - Mineral Fiber Preformed Pipe Insulation. F. ANSI/ASTM C552 - Cellular Glass Block and Pipe Thermal Insulation. G. ASTM C449 - Mineral Fiber Hydraulic-setting Thermal Insulating and Finishing Cement. H. ASTM C591 - Unfaced Preformed Rigid Cellular Polyisocyanurate Insulation. I. ASTM C578 - Preformed Cellular Polystyrene Thermal Insulation. J. ASTM C1126 - Standard Specification for Faced or Unfaced Rigid Cellular Phenolic Thermal Insulation. K. ASTM C1729 - Standard Specification for Aluminum Jacketing for Insulation. L. ASTM C1767 - Standard Specification for Stainless Steel Jacketing for Insulation. M. ASTM E84 - Surface Burning Characteristics of Building Materials. N. NFPA 255 - Surface Burning Characteristics of Building Materials. O. UL 723 - Surface Burning Characteristics of Building Materials. P. National Commercial & Industrial Insulation Standards - 1999 Edition - as published by Midwest Insulation Contractors Association and endorsed by National Insulation Contractors Association. Q. California Title 24 - Building Energy Efficiency Standards. 1.4 SUBMITTALS A. Submit shop drawings per Section 23 05 00. Include product description, list of materials and thickness for each service, and locations. PART 2 - PRODUCTS 2.1 INSULATION A. Type A: Glass fiber; ANSI/ASTM C547; 0.24 maximum 'K' value at 75°F; non- combustible. All-purpose polymer or polypropylene service jacket, listed and labeled at no more than 25/50 when tested per ASTM E84 or UL 723 as required by code. B. Type B: Flexible elastomeric foam insulation; closed-cell, sponge or expanded rubber (polyethylene type is not permitted); ANSI/ASTM C534, Grade 1 Type I for tubular materials; flexible plastic; 0.25 maximum 'K' value at 75°F, listed and labeled at more than 25/50 when tested per ASTM E84 or UL 723 as required by code. Maximum 1" thick per layer where multiple layers are specified. 734 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 19 - 3 HVAC PIPING INSULATION C. Type C: Molded rigid cellular glass; ANSI/ASTM C-552; 0.29 maximum 'K' value at 75°F; density 7.3lb/ft; minimum compressive strength 90 psi parallel to rise; moisture resistant, non-combustible; suitable for -100°F to +900°F. For below grade installations use asphaltic mastic paper vapor barrier jacket. Use self-seal all-purpose polymer or polypropylene service jacket for above grade installations. 2.2 VAPOR BARRIER JACKETS A. All-purpose polymer or polypropylene service jacket vapor barrier with self-sealing adhesive joints. Beach puncture resistance ratio of at least 50 units. Tensile strength: 35 psi minimum. Single, self-seal acrylic adhesive on longitudinal jacket laps and butt strips. B. Polyvinylidene Chloride (PVDC or Saran) film and tape: Durable and highly moisture and moisture vapor resistant. Please refer to manufacturer's recommended installation guidelines. 2.3 JACKET COVERINGS A. Aluminum Jackets: ASTM C1729; 0.016" thick (thicker where required by ASTM C1729); stucco embossed finish with Z edge seams and aluminum bands for outdoor use. Where colored jacket covers are called for, provide factory-applied hard film acrylic paint in color selected by Architect. 2.4 REMOVABLE INSULATION JACKETS A. Removable insulation jackets shall consist of outer covering, interstitial insulation material, and inner covering. B. Inner and outer covering shall be constructed from a minimum 16.5 oz./yd2 PTFE fiberglass composite and suitable for insulating surface temperatures up to 550°F. C. Interstitial insulation blanket shall be minimum 1-1/2" thick and shall consist of either: 1. Silica and glass-fiber insulation felts and blankets - minimum 6 lb./ft3 density. D. Construction: Inner and outer covering with interstitial insulation material shall be joined into a single assembly using a double sewn lock stitch with 4-6 stitches/inch. The thread used shall be able to withstand minimum 550°F surface temperatures without degradation. The use of hog rings, staples, and wires for closure of assembly are not acceptable. The interstitial insulation shall be sewn as an integral part of the inner and outer coverings to prevent shifting of the insulation. Insulation pins are not an allowable method of preventing the insulation from shifting and shall not be used. E. No raw cut jacket edges shall be exposed. F. Jackets shall be fastened to equipment and piping components using hook and loop (Velcro) straps and minimum 1" slide buckles. G. Jacket coverings shall have an inner covering edge with a continuous strip of hook & loop closure (Velcro) that is parallel to the seam and overlaps the outer covering by a minimum of 2 inches. 735 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 19 - 4 HVAC PIPING INSULATION H. Manufacturers: 1. Firwin Corp 2. Lewco Specialty Products 3. ThermaXX Jackets LLC 4. Approved equivalent PART 3 - EXECUTION 3.1 PREPARATION A. Install insulation after piping has been tested. Pipe shall be clean, dry and free of rust before applying insulation. B. Patch and repair torn insulation. Paint to match adjacent insulation surface. 3.2 INSTALLATION A. General Installation Requirements: 1. Install materials per manufacturer's instructions, building codes and industry standards. 2. Continue insulation with vapor barrier through penetrations. This applies to all insulated piping. Maintain fire rating of all penetrations. 3. All piping and insulation that does not meet 25/50 that is in an air plenum shall have written approval from the Authority Having Jurisdiction and the local fire department for authorization and materials approval. If approval has been allowed, the non-rated material shall be wrapped with a product that has been listed and labeled having a flame spread index of not more than 25 and a smoke- developed index of not more than 50 when tested as a composite in accordance with ASTM E84 or UL 723. 4. On 1" and smaller piping routed through metal wall studs, provide a plastic grommet to protect the piping. The piping shall be insulated between the wall studs, and the insulation shall butt up to each stud. B. Insulated Piping Operating Below 60°F: 1. Insulate fittings, valves, unions, flanges, flexible connections, flexible hoses, and expansion joints. Seal all penetrations of vapor barrier. C. Insulated Piping Operating Between 60°F and 140°F: 1. Do not insulate flanges and unions, but bevel and seal ends of insulation at such locations. Insulate all fittings, valves and strainers. 736 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 19 - 5 HVAC PIPING INSULATION D. Refrigerant Piping: 1. On refrigerant piping (25°F and above) and not required to meet the 25/50 flame/smoke, provide at each strut or clevis support an insulation coupling to support pipe and to accept insulation thickness of adjoining insulation, to prevent insulation from sagging and crushing. The coupling shall be suitable for planned temperatures, use with specified pipe material, and shall be a 360°, one-piece cylindrical segment. Use mechanical fasteners where coupling cannot be installed on pipe during installation. Contractor shall apply adhesive to ends of insulation entering insulation coupling to maintain vapor barrier. E. Exposed Piping: 1. Locate and cover seams in least visible locations. 2. Where exposed insulated piping extends above the floor, provide a sheet metal guard around the insulation extending 12" above the floor. Guard shall be 0.016" cylindrical smooth or stucco aluminum and shall fit tightly to the insulation. 3.3 SUPPORT PROTECTION A. Provide a shield on all insulated piping at each support between the insulation jacket and the support. B. On all insulated piping greater than 1-1/2", provide shield with insulation insert of same thickness and contour as adjoining insulation at each support, between the pipe and insulation jacket, to prevent insulation from sagging and crushing. Inserts shall be as follows: 1. The insert shall be suitable for planned temperatures, be suitable for use with specific pipe material, and shall be a minimum 180° cylindrical segment the same length as metal shields. Inserts shall be: a. Molded hydrous calcium silicate (only use for pipes with operating temperatures above 90°F, with a minimum compressive strength of 100 psi is acceptable for pipe sizes 14" and below. For pipe sizes larger than 14", provide rolled steel plate in addition to the shield. b. Cellular glass (for all temperature ranges) with a minimum compressive strength of 90 psi is acceptable for pipe sizes 14" and below. For pipe sizes larger than 14, provide rolled steel plate in addition to the shield. c. Phenolic (for pipes operating below 250°F with a minimum compressive strength of 90 psi is acceptable for pipe sizes 14" and below. For pipe sizes larger than 14", provide rolled steel plate in addition to the shield. d. As an alternative to separate pipe insulation insert and saddle, properly sized manufactured integral rigid insulation insert and shield assemblies may be used. 1) Products: a) Buckaroo CoolDry b) Cooper/B-Line Fig. B3380 through B3384 c) Pipe Shields A1000, A2000 737 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 19 - 6 HVAC PIPING INSULATION e. Insulation Couplings: 1) Molded thermoplastic slip coupling, -65°F to 275°F, sizes up to 4-1/8" OD, and receive insulation thickness up to 1". Suitable for use indoors or outdoors with UV stabilizers. Vertical insulation riser clamps shall have a 1,000lb vertical load rating. On cold pipes operating below 60°F, cover joint and coupling with vapor barrier mastic to ensure continuous vapor barrier. 2) Horizontal Strut Mounted Insulated Pipe Manufacturers: a) Klo-Shure or equal 3) Vertical Manufacturers: a) Manufacturers: Klo-Shure Titan or equal f. Rectangular blocks, plugs, or wood material are not acceptable. g. Temporary wood blocking may be used by the Piping Contractor for proper height; however, these must be removed and replaced with proper inserts by the Insulation Contractor. Refer to Supports and Anchors specification section for additional information. C. Neatly finish insulation at supports, protrusions, and interruptions. D. Install metal shields between all hangers or supports and the pipe insulation. Shields shall be galvanized sheet metal, half-round with flared edges. Adhere shields to insulation. On cold piping, seal the shields vapor-tight to the insulation as required to maintain the vapor barrier, or add separate vapor barrier jacket. 3.4 INSULATION A. Type A Insulation: 1. All Service Jackets: Seal all longitudinal joints with self-seal laps using a single pressure sensitive adhesive system. Do not staple. 2. Insulation without self-seal lap may be used if installed with Benjamin Foster 85- 20 or equivalent Chicago Mastic, 3M or Childers lap adhesive. 3. Fittings, Valve Bodies and Flanges: For 4" and smaller pipes, insulate with 1 lb. density insulation wrapped under compression to a thickness equal to the adjacent pipe insulation. For pipes over 4", use mitered segments of pipe insulation. Finish with preformed plastic fitting covers. Secure fitting covers with pressure sensitive tape at each end. Overlap tape at least 2" on itself. For pipes operating below 60°F, seal fitting covers with vapor retarder mastic in addition to tape. B. Type B Insulation: 1. Install per manufacturers instructions or ASTM C1710. 738 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 07 19 - 7 HVAC PIPING INSULATION 2. Elastomeric Cellular Foam: Where possible, slip insulation over the open end of pipe without slitting. Seal all butt ends, longitudinal seams, and fittings with adhesive. At elbows and tees, use mitered connections. Do not compress or crush insulation at cemented joints. Joints shall be sealed completely and not pucker or wrinkle. Paint the outside of outdoor insulation with two coats of latex enamel paint recommended by the manufacturer. 3. Insulation Installation on Straight Pipes and Tubes: a. Seal longitudinal seams and end joints with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated. b. Insulation must be installed in compression to allow for expansion and contraction. Insulation shall be pushed onto the pipe, never pulled. Stretching of insulation may result in open seams and joints. 4. Insulation Installation on Valves and Pipe Specialties: a. Install preformed sections of same material as straight segments of pipe insulation when available. b. When preformed sections are not available, install mitered sections of pipe insulation to valve body. c. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation. C. Type C Insulation: 1. Seal all longitudinal joints with manufacturer approved adhesive. Secure butt joint strips in a similar manner. 2. Insulate fittings with prefabricated fittings. 3.5 JACKET COVER INSTALLATION A. Metal Covering: 1. Provide vapor barrier as specified for insulation type. Cover with aluminum jacket covering with seams located on the bottom of horizontal piping. Include fittings, joints and valves. 2. Seal all interior and exterior butt joints with metal draw bands and sealant. Seal all exterior joints watertight. 3. Interior joints do not need to be sealed. 4. Use metal covering on the following pipes: a. All exterior piping. b. All exposed piping in areas noted on drawings. END OF SECTION 23 07 19 739 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 1 SMALL EQUIPMENT CONTROLS SECTION 23 09 05 SMALL EQUIPMENT CONTROLS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Complete System of Automatic Controls. B. Control Devices, Components, Wiring and Material. C. Instructions for Owners. D. Remodeling. 1.2 QUALITY ASSURANCE A. Manufacturer: Company specializing in manufacturing the products specified in this Section with minimum five years' experience. B. TCC: Company specializing in the work of this section with minimum three years temperature control experience. C. Technician: Minimum three years' experience installing commercial temperature control systems. D. TCCs are limited to firms regularly employing a minimum of one full-time temperature control technician within 100 miles of the job site. E. Control low (24V) and control line (120V) voltage wiring, conduit, and related switches and relays required for the automatic control and/or interlock of motors and equipment, including final connection, are to be furnished and installed under this section. 1.3 REFERENCES A. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. B. ANSI/ASHRAE Standard 135-2016: BACnet® - A Data Communication Protocol for Building Automation and Control Networks, including all amendments. C. ANSI/NEMA 250 - Enclosures for Electrical Equipment (1000 volts Maximum). D. ANSI/NFPA 70 - National Electrical Code. E. ANSI/NFPA 90A - Installation of Air-Conditioning and Ventilation Systems. F. ASHRAE 62.1 - Ventilation for Acceptable Indoor Air Quality. 740 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 2 SMALL EQUIPMENT CONTROLS G. ASHRAE 85 - Automatic Control Terminology for Heating, Ventilating, Air Conditioning. H. FCC CFR 47 - Radio Frequency Devices I. Federal Information Processing Standards (FIPS) Publication 197 - AES-128 Advanced Encryption Standard J. Federal Information Processing Standards (FIPS) Publication 198 - HMAC Keyed Hash Message Authentication Code K. Title 24 Part 6 California Energy Code (latest adopted edition) L. Title 24 Part 6 California Mechanical Code (latest adopted edition) 1.4 SUBMITTALS A. Equipment Coordination: 1. The Mechanical Contractor shall obtain approved equipment submittals from other contractors to determine equipment wiring connections, to choose appropriate controllers, and to provide programming. 2. Coordinate the control interface of all equipment with the equipment manufacturers prior to submittal submission. B. Shop Drawings: 1. Submit shop drawings per Section 23 05 00. In addition, submit an electronic copy of the shop drawings in Adobe Acrobat (.pdf) format to the Owner for review. 2. Cross-reference all control components and point names in a single table located at the beginning of the submittal with the identical nomenclature used in this section. 3. System Architecture: Provide riser diagrams of wiring between central control unit and all control panels. This shall include specific protocols associated with each level within the architecture. Identify all interface equipment between CPU and control panels. 4. Diagrams shall include: a. Wiring diagrams and layouts for each control panel showing all termination numbers. b. Schematic diagrams for all control, communication, and power wiring. Provide a schematic drawing of the central system installation. Label all cables and ports with computer manufacturers' model numbers and functions. Show all interface wiring to the control system. c. Identification of all control components connected to emergency power. d. Schematic diagrams for all field sensors and controllers. e. A schematic diagram of each controlled system. The schematics shall have all control points labeled. The schematics shall graphically show the location of all control elements in the system. 741 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 3 SMALL EQUIPMENT CONTROLS f. A schematic wiring diagram for each controlled system. Each schematic shall have all elements labeled. Where a control element is the same as that shown on the control system schematic, label it with the same name. Label all terminals. g. A tabular instrumentation list for each controlled system. The table shall show element name, type of device, manufacturer, model number and product data sheet number. h. All installation details and any other details required to demonstrate that the system will function properly. i. All interface requirements with other systems. 5. The network infrastructure shall conform to the published guidelines for wire type, length, number of nodes per channel, termination, and other relevant wiring and infrastructure criteria as published. The number of nodes per channel shall be no more than 80% of the defined segment (logical or physical) limit in order to provide future system enhancement with minimal infrastructure modifications. 6. Sequences: Submit a complete description of the operation of the control system, including sequences of operation. The description shall include and reference a schematic diagram of the controlled system. The wording of the control sequences in the submittal shall match verbatim that included in the construction documents to ensure there are no sequence deviations from that intended by the Architect/Engineer. Clearly highlight any deviations from the specified sequences on the submittals. 7. Points List Schedule: Submit a complete points list of all points to be connected to the TCS and FMCS. The points list for each system controller shall include both inputs and outputs (I/O), point number, the controlled device associated with the I/O point, the location of the I/O device, and reference drawings. Where a control point is the same as that shown on the control system schematic, label it with the same name. Points list shall specifically identify alarms, trends, event history, archive, totalization, graphic points, and all mapped points from other systems (security systems, lighting control, fire alarm, etc.). Provide points lists, point naming convention, and factory support information for systems provided and integrated into the FMCS. 8. Product Data Sheets: Required for each component that includes: unique identification tag that is consistent throughout the submittal, manufacturer's description, technical data, performance curves, installation/maintenance instructions, and other relevant items. When manufacturer's literature applies to a product series rather than a specific product, the data specifically applicable to the project shall be highlighted or clearly indicated by other means. Each submitted piece of literature and drawings shall clearly reference the specification and/or drawing that the submittal is to cover. General catalogs shall not be accepted as cutsheets to fulfill submittal requirements. 9. Provide documentation of submitted products that have been tested and listed by the BACnet Testing Laboratory (BTL) or provide a letter on the manufacturer's company letterhead indicating the anticipated date by which testing is expected to be completed. If, for any reason, BTL testing and listing has not been completed, a written commitment to upgrade installed controls to a version that meets BTL testing and listing requirements if problems are found during BTL testing is required. 742 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 4 SMALL EQUIPMENT CONTROLS 10. Control System Demonstration and Acceptance: Provide a description of the proposed process, along with all reports and checklists to be used. 11. Clearly identify work by others in the submittal. 12. Quantities of items submitted may be reviewed but are the responsibility of the Contractor to verify. C. Operation and Maintenance Manual: 1. In addition to the requirements of Section 23 05 00, submit an electronic copy of the O&M manuals in PDF format. 2. Provide three complete sets of manuals. 3. Each O&M manual shall include: a. Table of contents with indexed tabs dividing information as outlined below. b. Definitions: List of all abbreviations and technical terms with definitions. c. Warranty Contacts: Names, addresses, and 24-hour telephone numbers of contractors installing equipment and controls and service representatives of each. d. Licenses, Guarantees, and Warranties: Provide documentation for all equipment and systems. e. System Components: Alphabetical list of all system components, with the name, address, and telephone number of the vendor. f. Operating Procedures: Include procedures for operating the control systems; logging on/off; enabling, assigning, and reporting alarms; generating reports; collection, displaying, and archiving of trended data; overriding computer control; event scheduling; backing up software and data files; and changing setpoints and other variables. g. Programming: Description of the programming language (including syntax), statement descriptions (including algorithms and calculations used), point database creation and modification, program creation and modification, and use of the editor. h. Engineering, Installation, and Maintenance: Explain how to design and install new points, panels, and other hardware; recommended preventive maintenance procedures for all system components, including a schedule of tasks (inspection, cleaning, calibration, etc.), time between tasks, and task descriptions; how to debug hardware problems; and how to repair or replace hardware. A list of recommended spare parts. i. Original Software: Complete original issue CDs for all software provided, including operating systems, programming language, operator workstation software, and graphics software. In lieu of CDs, provide login information and access to a web application where the current information can be downloaded at no additional cost. D. Training Manual: 1. Provide a course outline and training manuals for each training class. Provide login information and access to a web application where the current training manuals can be downloaded at no additional cost. 743 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 5 SMALL EQUIPMENT CONTROLS E. Record Documents: 1. Submit record documentation per Section 23 05 00. 2. Provide a complete set of "as-built" drawings and application software on CDs. Provide drawings as AutoCAD¢¢ or Visio¢¢ compatible files. Provide two copies of the "as-built" drawings with revisions clearly indicated in addition to the documents on compact disk. Provide all product data sheets in PDF format. 3. Submit two hard copies and one electronic copy of as-built versions of the shop drawings, including product data and record drawings with revisions clearly indicated. Provide floor plans showing actual locations of control components including panels, thermostats, sensors, and hardware. 4. Provide all completed testing and commissioning reports and checklists. 5. Submit printouts of all graphic screens with current values (temperatures, pressures, etc.) to the A/E verifying completion and proper operation of all points. 1.5 DELIVERY, STORAGE AND HANDLING A. Provide factory-shipping cartons for each piece of equipment and control device. Maintain cartons through shipping, storage, and handling as required to prevent equipment damage. Store equipment and materials inside and protected from weather. B. Factory-Mounted Components: Where control devices specified in this section are indicated to be factory mounted on equipment, arrange for shipping control devices to unit manufacturer. 1.6 AGENCY AND CODE APPROVALS A. All products shall have the following agency approvals. Provide verification that the approvals exist for all submitted products with the submittal package. 1. UL-916; Energy Management Systems. 2. C-UL listed to Canadian Standards Association C22.2 No. 205-M1983 "Signal Equipment." 3. EMC Directive 89/336/EEC (European CE Mark). 4. FCC, Part 15, Subpart J, Class A Computing Devices. 1.7 ACRONYMS A. Acronyms used in this specification are as follows: 1. PICS - Product Interoperability Compliance Statement 2. TCS - Temperature Control System 1.8 SYSTEM DESCRIPTION A. Provide materials and labor necessary to connect factory-supplied control components. B. Provide central and remote hardware, software, and interconnecting wire and conduit where required. 744 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 6 SMALL EQUIPMENT CONTROLS C. For each touchscreen display, mobile application, and web user interface provided, furnish one legal copy of all software tools, configuration tools, management tools, and utilities used during system commissioning and installation. All tools shall be readily available in the market. Contractor shall convey to the Owner all software tools and their legal licenses at project closeout. 1.9 JOB CONDITIONS A. Cooperation with Other Trades: Coordinate the Work of this section with that of other sections to ensure that the Work will be carried out in an orderly fashion. It is this Contractor's responsibility to check the Contract Documents for possible conflicts between the Work of this section and that of other crafts in equipment location; pipe, duct and conduit runs; electrical outlets and fixtures; air diffusers; and structural and architectural features. 1.10 WARRANTY A. Refer to Section 23 05 00 for warranty requirements. B. Within the warranty period, any defects in the work provided under this section due to faulty materials, methods of installation or workmanship shall be promptly (within 48 hours after receipt of notice) repaired or replaced by this Contractor at no expense to the Owner. C. Update all software and back-ups during warranty period and all user documentation on the Owner's archived software disks. 1.11 WARRANTY ACCESS A. The Owner shall grant to this Contractor reasonable access to the TCS and FMCS during the warranty period. PART 2 - PRODUCTS 2.1 OPERATOR INTERFACES A. Touchscreen Display: 1. 10" color touchscreen display that allows the users to accomplish the following tasks: a. Control the setpoints for multiple pieces of equipment with a single touch. Setpoint adjustment by the occupant shall be bound by editable limits. Occupant override of the system/equipment operating mode shall be possible with a single touch on the touchscreen display. b. The touchscreen display shall provide user access to a system schedule. Users shall have the ability to schedule events more than one year in advance. Exception schedules and holidays shall be shown clearly on the calendar, visible to the occupant on the touchscreen display. 745 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 7 SMALL EQUIPMENT CONTROLS c. The touchscreen display shall offer PIN control, which shall limit system control access to only those with proper login credentials. d. The touchscreen display shall display the alerts that require service of the connected equipment. 2.2 ZONE SENSORS A. Temperature Sensors: 1. Room Temperature Sensor: a. Sensor Only: Two-piece construction, ventilated plastic enclosure, off-white color, thermistor sensing element or resistance temperature device (RTD), 45°F to 90°F operating range, ± 0.50°F accuracy, no setpoint adjustment or override button. b. Sensor with Setpoint Adjustment: Two-piece construction, ventilated plastic enclosure, off-white color, thermistor sensing element or resistance temperature device (RTD), 45°F to 90°F operating range, ± 0.50°F accuracy, with exposed single setpoint adjustment (no numeric temperature scale - provide with a single warmer/cooler or red/blue visual scale), no override button. c. Sensor with Override: Two-piece construction, ventilated plastic enclosure, off-white color, thermistor sensing element or resistance temperature device (RTD), 45°F to 90°F operating range, ± 0.50°F accuracy, occupied/unoccupied override button with LED, no setpoint adjustment. d. Sensor with Setpoint Adjustment and Override: Two-piece construction, ventilated plastic enclosure, off-white color, thermistor sensing element or resistance temperature device (RTD), 45°F to 90°F operating range, ± 0.50°F accuracy, with exposed single setpoint adjustment (no numeric temperature scale - provide with a warmer/cooler or red/blue visual scale), occupied/unoccupied override button with LED. e. Sensors shall include the following functions: 1) A signal strength on the space sensor display. 2) Error codes shall be displayed on the digital display. Error codes shall include: not associated, address to 000, improper software configuration, input voltage too high, or general sensor failure. Codes shall be indicated on inside of sensor back cover. 3) Text display shall be a minimum font size of 12 points. 4) Provide an LCD display readable in low light conditions, and text display shall be a minimum font size of 12 points. 5) Space/wall sensors shall be supplied with batteries having a minimum life of 15 years. 6) Space/wall sensors shall be supplied with power harvesting capabilities to supplement battery life. 746 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 8 SMALL EQUIPMENT CONTROLS B. Carbon Dioxide Sensors: 1. Microprocessor based non-dispersive infrared sensor with range of 0 to 2,000 ppm CO2 with ± 100 ppm accuracy, maximum drift (compensated) of ± 5% full scale in five years, VOC software and hardware sensing, duct mounting where applicable, 0-10V dc or 4-20 mA output directly proportional to ppm, adjustable alarm limit, membrane filter, and terminal block. The diffusion gas chamber in the sensor shall incorporate a reflective light pipe or wave guide surrounded by a gas permeable membrane that prevents particulate contamination of the sensor. Unit shall have selectable IAQ mode with output signal and sum of CO2 and VOC levels. 2.3 CONDUIT AND BOXES A. Conduit and Boxes: Refer to Electrical Section 26 05 33 for materials, sizing, and other requirements. B. Conduit and Box Identification (Color and Labeling): 1. Refer to the Temperature Control Contractor notes located on the mechanical cover sheet for raceway and box color requirements. 2. Refer to Electrical Section 26 05 53 for raceway and box labeling requirements. 2.4 WIRE AND CABLE A. Wire and Cable: Refer to Electrical Section 26 05 13 for wire and cable materials. 1. Wire and Cable Color: Refer to the Temperature Control Contractor notes located on the mechanical cover sheet for wire and cable color requirements. 2.5 SEQUENCE OF OPERATION (PRESCRIPTIVE) A. The following items are prescriptive sequences. Refer to the drawings for the complete sequence of operations. B. System Operating Modes: The system controller shall send the equipment controllers Occupied/Unoccupied, Morning Warm-up/Pre-cool, and Heat/Cool modes. If communication is lost, the equipment controllers shall operate using default modes and setpoints. 1. Night Setback: During unoccupied mode, the system shall shut off. If the zone temperature drifts to the unoccupied heating or cooling setpoint, the system shall start up to heat or cool the zone while the OA damper remains closed (unless economizing). 2. Optimal Start: The system controller shall automatically determine the optimal start time such that each zone reaches its occupied setpoint just in time for scheduled occupancy. 3. Demand Controlled Ventilation: For those zones equipped with an occupancy sensor or CO2 sensor, outdoor airflow shall be reset based on occupancy status and/or measured CO2 concentration. 747 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 9 SMALL EQUIPMENT CONTROLS C. Single-Zone Constant Volume System: 1. Occupied Heat/Cool: The RTU shall operate the supply fan continuously and modulate (or cycle) compressors, modulate (or stage) heat, and/or enable airside economizing to maintain zone temperature at setpoint. The OA damper shall open to bring in the required amount of ventilation. 2. Morning Warm-Up/Pre-Cool: The RTU shall operate the supply fan and modulate (or cycle) compressors or modulate (or stage) heat to raise/lower zone temperature to its occupied setpoint. The OA damper shall remain closed, unless economizing. PART 3 - EXECUTION 3.1 GENERAL INSTALLATION A. Verify that systems are ready to receive work. Beginning of installation means installer accepts existing conditions. B. Install system and materials in accordance with manufacturer's instructions. C. Install all operators, sensors, and control devices where accessible for service, adjustment, calibration, and repair. Do not install devices where blocked by piping or ductwork. Devices with manual reset or limit adjustments shall be installed below 6'-0" if practical to allow inspection without using a ladder. D. Verify locations of wall-mounted devices (such as thermostats, temperature and humidity sensors, and other exposed sensors) with drawings and room details before installation. Coordinate mounting heights to be consistent with other wall-mounted devices. Maximum height above finished floor shall not exceed 48". E. Mount control panels adjacent to associated equipment on vibration-free walls or freestanding angle iron supports. One cabinet may accommodate more than one system in same equipment room. F. After completion of installation, test and adjust control equipment. G. Check calibration of instruments. Recalibrate or replace. H. Furnish and install conduit, wire, and cable per the National Electric Code, unless noted otherwise in this section. All hardware, software, equipment, accessories, wiring (power and sensor), relays, sensors, power supplies, transformers, and instrumentation required for a complete and operational FMCS system, but not shown on the electrical drawings, are the responsibility of the TCC. 748 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 10 SMALL EQUIPMENT CONTROLS I. Remodeling: 1. All room devices as indicated on the drawings shall be removed by this Contractor. The Contractor shall also prepare the wall for finishes. Preparing the wall shall include patching old anchor holes (after the anchoring device has been removed) and sanding the wall to remove old paint outlines remaining from original devices. The wall shall be painted to match the existing wall prior to the installation of the new room device. If wall covering requires patching, the Contractor shall furnish new wall covering to match existing. If new wall covering is not available to match existing, the Contractor shall furnish a white acrylic or Plexiglas plate, 1/4" thick and sized to cover the void. J. Labels For Control Devices: 1. Provide labels indicating service of all control devices in panels and other locations. 2. Labels may be made with permanent marking pen in the control panels if clearly legible. 3.2 CONDUIT AND BOXES INSTALLATION A. Conduit and Box Installation: Refer to Electrical Section 26 05 33 for execution and installation. B. Conduit and Box Identification (color and labeling) installation. Refer to Electrical Section 26 05 53 for raceway and box identification installation. C. Outlet Box Schedule: Thermostat/temperature sensor: 1. Dry Interior Locations: Provide 4" square galvanized steel with raised cover to fit flush with finished wall line. When located in concrete block walls, provide square edge title cover of sufficient depth to extend out to face of block or masonry boxes. 3.3 WIRE AND CABLE INSTALLATION A. Wire and Cable Installation: Refer to Electrical Section 26 05 13 for execution and installation. B. Field Quality Control: 1. Inspect wire and cable for physical damage and proper connection. 2. Torque test conductor connections and terminations to manufacturer's recommended values. 749 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 11 SMALL EQUIPMENT CONTROLS 3. Protection of cable from foreign materials: a. It is the Contractor's responsibility to provide adequate physical protection to prevent foreign material application or contact with any cable type. Foreign material is defined as any material that would negatively impact the validity of the manufacturer's performance warranty. This includes, but is not limited, to overspray of paint (accidental or otherwise), drywall compound, or any other surface chemical, liquid or compound that could come in contact with the cable, cable jacket or cable termination components. b. Overspray of paint on any cable, cable jacket or cable termination component will not be accepted. It shall be the Contractor's responsibility to replace any component containing overspray, in its entirety, at no additional cost to the project. Cleaning of the cables with harsh chemicals is not allowed. This requirement is regardless of the PASS/FAIL test results of the cable containing overspray. Should the manufacturer and warrantor of the structured cabling system desire to physically inspect the installed condition and certify the validity of the structured cabling system (via a signed and dated statement by an authorized representative of the structured cabling manufacturer), the Owner may, at their sole discretion, agree to accept said warranty in lieu of having the affected cables replaced. In the case of plenum cabling, in addition to the statement from the manufacturer, the Contractor shall also present to the Owner a letter from the local Authority Having Jurisdiction stating that they consider the plenum rating of the cable to be intact and acceptable. C. Installation Schedule: 1. Conduit terminations to all devices installed in applications with rotating equipment, expansion/contraction or vibration shall be made with flexible metallic conduit, unless noted otherwise. Final terminations to exterior devices installed in damp or wet locations shall be made with liquidtight flexible metallic conduit. Terminations in hazardous areas, as defined in the National Electrical Code, shall be made with flexible conduit rated for the environment. 3.4 PREPARATION FOR BALANCING A. Verify that all dampers are in the position indicated by the controller (e.g., open, closed or modulating). B. Check the calibration and setpoints of all controllers. C. Check the locations of all thermostats for potential erratic operation from outside influences such as sunlight, drafts, or cold walls. D. Check that all sequences operate as specified. Verify that no simultaneous heating and cooling occurs, unless specified. Observe that heating cannot begin at TAB reheat terminals until the unit is at the minimum cfm. E. Verify the operation of all interlock systems. 750 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 09 05 - 12 SMALL EQUIPMENT CONTROLS 3.5 TEST AND BALANCE COORDINATION A. The Contractor shall furnish a single set of all tools necessary to interface to the control system for test and balance purposes. B. The tools used during the test and balance process shall be returned at the completion of the testing and balancing. 3.6 DEMONSTRATION AND ACCEPTANCE A. At completion of installation, provide four hours minimum instruction for operators. Demonstrate operation of all controls and systems. Describe the normal operation of all equipment. 3.7 INSTALLATION OF SENSORS A. Install sensors in accordance with the manufacturer's recommendations. B. Mount sensors rigidly and adequately for the environment within which the sensor operates. C. All wires attached to sensors shall be air sealed in their raceways or in the wall to stop air transmitted from other areas affecting sensor readings. D. Averaging sensors and low limits shall be installed at the top of the assembly with the element on a slight downward incline away from the sensor making a serpentine pattern over the cross-sectional area with elements spaced not over 12" apart and within 6" of the top and bottom of the area. E. Install all wall-mounted CO2 sensors between 3 feet and 6 feet above the floor. END OF SECTION 23 09 05 751 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 1 DUCTWORK SECTION 23 31 00 DUCTWORK PART 1 - GENERAL 1.1 SECTION INCLUDES A. Galvanized Ductwork B. Ductwork Reinforcement C. Ductwork Sealants D. Rectangular Ductwork E. Round Ductwork F. Exposed Ductwork (Rectangular, Round, or Oval) G. Flexible Duct H. Acoustical Lagging I. Leakage Testing J. Ductwork Penetrations 1.2 REFERENCES: Conform to all applicable requirements of the following publications: A. ADC Flexible Duct Performance and Installation Standards, 3rd Edition 1996. B. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. C. ANSI/AWS A5.11M (1997) - Specification for Nickel and Nickel Alloy Welding Electrodes for Shielded Metal Arc Welding. D. ASHRAE - Handbook 2012 Systems and Equipment; Chapter 19 - Duct Construction. E. ASHRAE - Handbook 2013 Fundamentals; Chapter 21 - Duct Design. F. ASHRAE 170 (latest published edition) - Ventilation of Health Care Facilities. G. ASTM A90 - Standard Test Method for Weight (Mass) of Coating on Iron and Steel Articles with Zinc or Zinc-Alloy Coatings. H. ASTM A653 - Steel Sheet, Zinc-Coated (Galvanized) or zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process. 752 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 2 DUCTWORK I. ASTM A924 - Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process. J. ASTM E90-02 - Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions. K. ASTM E413-87 - Classification for Rating Sound Insulation. L. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers Version 1.1. M. NFPA 90A - Installation of Air-Conditioning and Ventilating Systems. N. NFPA 90B - Installation of Warm Air Heating and Air- Conditioning Systems. O. NFPA 96 - Ventilation Control and Fire Protection of Commercial Cooking Equipment. P. SMACNA - Air Duct Leakage Test Manual. Q. SMACNA - HVAC Duct Construction Standards. R. SMACNA - Round Industrial Duct Construction Standards - 1999 Edition. S. UL 181 - Factory-Made Air Ducts and Air Connectors. T. UL 181A - Closure Systems for Use with Rigid Air Ducts and Air Connectors U. UL 181B - Closure Systems for Use with Flexible Air Ducts and Air Connectors. V. CMC California Mechanical Code W. CBC California Building Code 1.3 SUBMITTALS A. Submit shop drawings per Section 23 05 00. B. Submit duct fabrication standards in compliance with SMACNA and these specifications. Clearly indicate metal gauges, reinforcement, and joining methods intended for use for each pressure classification. Furnish details of all common duct fittings and joint connections to be used on this project. C. The Architect/Engineer may require field verification of sheet metal gauges and reinforcing to verify compliance with these specifications. At the request of the Architect/Engineer, the contractor shall remove a sample of the duct for verification. The contractor shall repair as needed. 753 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 3 DUCTWORK D. Duct Layout Drawings: Submit detailed duct layout drawings at 1/4" minimum scale complete with the following information: 1. Actual duct routing, ductwork fittings, actual sheet metal dimensions including insulation liner and wrap, duct hanger and support types, ductwork accessories, etc. with lengths and weights noted. 2. Differentiate ducts that are wrapped. Include insulation thickness, type of insulation, and acoustical lagging. 3. Room names and numbers, ceiling types, and ceiling heights. 4. Indicate location of all beams, bar joists, etc. along with bottom of steel elevations for each member. 5. Verify clearances and interferences with other trades prior to preparing drawings. IMEG will provide electronic copies of ventilation drawings for contractor's use if the contractor signs and returns the "Electronic File Transfer" waiver. IMEG will not consider blatant reproductions of original file copies an acceptable alternative for this submittal. Refer also to Section 23 05 00. Contractor shall submit CAD files to owner. E. Duct Leakage Test Summary Report: Upon completion of the pressure test described in Part 3, the Contractor shall submit an air duct leakage test summary report as outlined in the SMACNA HVAC Duct Leakage Test Manual. 1.4 DEFINITIONS A. Duct Sizes shown on drawings are inside clear dimensions. Maintain clear dimensions inside any lining. B. Transitions are generally not shown in single-line ductwork. Where sizes change at a divided flow fitting, the larger size shall continue through the fitting. C. Exterior Duct: Ductwork located outside the conditioned envelope including exposed ductwork above the roof, outside exterior walls, in attics above insulated ceilings, inside parking garages, and crawl spaces. D. Interior Duct: Ductwork located within the conditioned envelope including return air plenums and indirectly conditioned spaces. 1.5 COORDINATION DRAWINGS A. Reference Coordination Drawings article in Section 23 05 00 for required duct systems electronic CAD drawings to be provided to Coordinating Contractor for inclusion into composite coordination drawings. B. Duct drawings shall be at 1/4" minimum scale complete with the following information: 1. Actual duct routing, ductwork fittings, actual sheet metal dimensions including insulation liner and wrap, duct hanger and support types, ductwork accessories, etc. with lengths and weights noted. 2. Differentiate ducts that are lined or wrapped. Include insulation thickness, type of insulation, and acoustical lagging. 3. Location and size of all duct access doors. 4. Room names and numbers, ceiling types, and ceiling heights. 754 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 4 DUCTWORK 5. Indicate location of all beams, bar joists, etc. along with bottom of steel elevations for each member. 6. IMEG will provide electronic file copies of ventilation drawings for contractor's use if the contractor signs and returns an "Electronic File Transfer" waiver provided by IMEG. IMEG will not consider blatant reproductions of original file copies an acceptable alternative for coordination drawings. Architectural plans will need to be obtained from the Architect. Contractor shall submit CAD files to owner. PART 2 - PRODUCTS 2.1 SHAPE A. Rectangular Duct - Single Wall: 1. General Requirements: a. All ductwork gauges and reinforcements shall be as listed in SMACNA Duct Construction Standards Chapter 2. Where necessary to fit in confined spaces, furnish heaviest duct gauge and least space consuming reinforcement. 2. Exceptions and modifications to the 2005 HVAC Duct Construction Standards are: a. All ducts shall be cross-broken or beaded. b. Snap lock seams are not permitted. c. Turning vanes shall be used in all 90° mitered elbows, unless clearly noted otherwise on the drawings. Vanes shall be as follows: 1) Type 1: a) Description: Single wall type with 22-gauge (0.029") or heavier vanes, 3-1/4" blade spacing, and 4" to 4-1/2" radius. Vanes hemmed if recommended by runner manufacturer. Runners shall have extra-long locking tabs. C-value independently tested at below 0.26. EZ Rail II by Sheet Metal Connectors or equal. b) Usage: Limited to 3,000 fpm and vane lengths 36" and under. d. Where smooth radius rectangular elbows are shown, they shall be constructed per SMACNA Figure 4-2. Type RE1 shall be constructed with a centerline duct radius R/W of 1.0. Where shown on drawings, Type RE3 elbows with 3 vanes shall be used with centerline duct radius R/W of 0.6 (SMACNA r/W=0.1). RE1 or RE3 elbows may be used where mitered elbows are shown if space permits. Mitered elbows (with or without turning vanes) may not be substituted for radius elbows. Do not make branch takeoffs within 4 duct diameters on the side of the duct downstream from the inside radius of radius elbows. e. Rectangular branch and tee connections in ducts over 1" pressure class shall be 45° entry type per Figs. 4-5 and 4-6. Rectangular straight taps are not acceptable above 1" pressure class. 755 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 5 DUCTWORK f. Bellmouth fittings shown on return duct inlets shall expand at a 60-degree total angle horizontally and vertically (space permitting) and have length of at least 25% of the smallest duct dimension. g. Round taps off rectangular unlined ducts shall be flanged conical or bellmouth type (equal to Buckley Bellmouth or Sheet Metal Connectors E-Z Tap), or 45° rectangular with transition to round (equal to Sheet Metal Connectors Inc. High Efficiency Takeoff). Straight taps are acceptable if pressure class is 1" or less, round duct is 12" diameter or less, and the tap is not located between fans and TAB devices. h. Duct offsets shall be constructed as shown on drawings. Additional offsets required in the field shall be formed of mitered elbows without turning vanes for offsets up to 30° maximum angle in accordance with SMACNA offset Type 2. Offsets of greater than 30° angle shall be formed of radius elbows with centerline radius R/W=1.0 or greater. SMACNA Type 1 offsets are not permitted. i. All lined duct shall utilize dovetail joints where round or conical taps occur. The dovetail joints shall extend past the liner before being folded over. j. Cushion heads are acceptable only downstream of TAB devices in ducts up to ± 2" pressure class, and must be less than 6" in length. k. Slide-on flanged transverse joint systems are acceptable provided they are a manufactured product that has been tested for conformance with Chapter 2 of the SMACNA HVAC Duct Construction Standards for sheet and joint deflection at the specified pressure class. 1) Apply sealant to all inside corners. Holes at corners are not acceptable. 2) Manufacturers: a) Ductmate Industries - 25/35/45 b) Nexus c) Mez d) WDCI e) Other manufacturers must submit test data and fabrication standards and receive Architect/Engineer's approval before any fabrication begins. l. Formed-on flanged transverse joint systems are acceptable provided they are a manufactured product that has been tested for conformance with Chapter 2 of the SMACNA HVAC Duct Construction Standards for sheet and joint deflection at the specified pressure class. 1) Apply sealant to all inside corners. Holes at corners are not acceptable. 2) Flanges shall be 24-gauge minimum (not 26 gauge). 3) Manufacturers: a) Lockformer TDC b) TDF c) United McGill 756 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 6 DUCTWORK B. Round and Flat Oval Spiral Seam Ductwork - Single Wall: 1. Conform to applicable portions of Rectangular Duct Section. Round or flat oval ductwork may be substituted for rectangular ductwork where approved by the Architect/Engineer. The spiral seam ductwork shall meet the standards set forth in this specification. The ductwork shall meet or exceed the specified cross- sectional area and insulation requirements. The substitution shall be coordinated with all other trades prior to installation. 2. 90° elbows shall be smooth radius or have a minimum of five sections with mitered joints and R/D of at least 1.5. 3. Duct and fittings shall meet the required minimum gauges listed in chapter 3 of the SMACNA requirements for the specified pressure class. Ribbed and lightweight duct are not permitted. 4. Ductwork shall be suitable for velocities up to 5,000 fpm. 5. Divided flow fittings may be made as separate fittings or factory installed taps with sound, airtight, continuous welds at intersection of fitting body and tap. 6. Ducts with minor axis less than 22" shall be spiral seam type. Larger ducts may be rolled, longitudinal welded seam type. SMACNA seams RL-2 and RL-3 are not permitted. 7. Transverse Joint Connections: a. Crimped joints are not permitted. b. Ducts and fittings 36" in diameter and smaller shall have slip joint connections. Size fitting ends to slip inside mating duct sections with minimum 2-inch insertion length and a stop bead. Use inside slip couplings for duct-to-duct joints, and outside slip couplings for fitting-to-fitting joints. c. Ducts and fittings larger than 36" shall have flanged connections. d. Secure all joints with at least 3 sheet metal screws before sealing. e. Manufacturers: 1) Slide-on Flanges: 2) Ductmate Industries - SpiralMate 3) Accuflange 4) Sheet Metal Connectors are acceptable. f. Manufacturers, Self-Sealing Duct Systems: 1) Lindab 2) Ward "Keating Coupling" 2.2 MATERIAL AND APPLICATION SPECIFIC A. Galvanized Steel: 1. General Requirements: a. Duct and reinforcement materials shall conform to ASTM A653 and A924. b. Interior Ductwork and reinforcements: G60 galvanized (0.60 ounces per square foot total zinc coating for two sides per ASTM A90) unless noted otherwise. 757 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 7 DUCTWORK c. Exterior Ductwork: G90 galvanized (0.90 ounces per square foot total zinc coating for two sides per ASTM A90) unless noted otherwise. G60 is not acceptable for exterior use. d. Ductwork reinforcement shall be of galvanized steel. 2. Duct Hangers and Support: a. Ductwork supports shall be of galvanized or painted steel. b. All fasteners shall be galvanized or cadmium plated. c. Strap Hangers: Strap hanger shall be a minimum of 1 inch, 18 gauge galvanized steel attached to the bottom of ducts at 8'-0" OC and as required by CMC/UMC and SMACNA guidelines. d. Cable Hangers: 1) Aircraft cable and slip cable hangers are acceptable for ducts up to 18" diameter. Protective sleeve tubing shall be used on the cable when supporting duct with exterior insulation. Corner saddles are required when supporting rectangular ductwork. Manufacturers; Supports: a) Gripple b) Ductmate c) Duro Dyne d) Architect/Engineer approved 2) Aircraft cable with 2-point support in standard horseshoe arrangement. Protective sleeve tubing shall be used on the cable when supporting duct with exterior insulation. 8'-0" OC and as required by CMC/UMC and SMACNA guidelines. e. Integral Corner Connector Hanger: Integral hanger and corner assembly for use with TDC/TDF style duct flanges. Die stamped offset hanger connects to the flanged corner assembly. For use with aircraft cable or 1/4" or 3/8" diameter threaded rods. Tested to hold up to 1,400 lbs. Install per manufacturer™™s ratings and instructions. 1) Manufacturers; Supports: a) EZ Hanger 2.3 DUCTWORK REINFORCEMENT A. All reinforcement shall be external to the duct except that tie rods may be used with the following limitations. 1. Ducts must be over 18" wide. 2. Duct dimensions must be increased 2" in one dimension (h or w) for each row of tie rods installed. 3. Tie rods must not exceed 1/2" diameter. 4. Manufacturer of tie rod system must certify pressure classifications of various arrangements, and this must be in the shop drawings. 758 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 8 DUCTWORK 2.4 DUCTWORK SEALANTS A. One-part joint sealers shall be water-based mastic systems that meet the following requirements: maximum 48-hour cure time, service temperature of -20°F to +175°F, resistant to mold, mildew and water, flame spread rating below 25 and smoke- developed rating below 50 when tested in accordance with ASTM E84, suitable for all SMACNA seal classes and pressure classes. Mastic used to seal flexible ductwork shall be marked UL 181B-M. B. Two-part joint sealers shall consist of a minimum 3" wide mineral-gypsum compound impregnated fiber tape and a liquid sealant. Sealant system shall meet the following requirements: maximum 48-hour cure time, service temperature of 0°F to 200°F, resistant to mold, mildew, and water, flame spread rating below 25 and smoke developed rating below 50 when tested in accordance with ASTM E84, suitable for all SMACNA seal classes and pressure classes. Joint sealers for use on exterior weather exposed ductwork shall be rated for -30°F to +175°F and 2000-hour minimum UV resistance per ASTM G-53. C. Pressure sensitive tape used for sealing ductwork shall be minimum 2.5-inch wide, listed and marked UL 181A-P, having minimum 60 oz/inch peel adhesion to steel, and service temperature range from -20°F to +250°F. D. Where pressure sensitive tape is called for on drawings and specifications for sealing flexible ductwork, tape shall be minimum 2.5-inch wide, UL 181 B-FX listed, and marked tape having minimum 60 oz/inch peel adhesion to steel and service temperature range from -20°F to +250°F. 1. Manufacturers, Pressure-Sensitive Tape: a. Venture Tape 1581A b. Compac #340 c. Scotch Foil Tape 3326 d. Polyken 339 2.5 FLEXIBLE DUCT A. Flexible duct shall be listed and labeled as UL 181 Class 1 Air Duct Material, and shall comply with NFPA 90A and 90B, and meet GSA, FHA and other U.S. Government agency standards. Flexible duct shall bear the ADC Seal of Certification. B. Flame Spread/Smoke Developed: Not over 25/50. C. Stretch all flexible duct to prevent sags and reduce air friction. Shorten and reinstall all sagging or loose flexible duct. Avoid sharp elbows. Elbows shall maintain 1.5 diameter centerline turning radius. D. Install per the SMACNA Flexible Duct Manual. Secure inner layer with draw band. Wrap with pressure sensitive tape for protection prior to installing draw band. Pressure sensitive tape alone is not acceptable. 759 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 9 DUCTWORK E. Standard: 1. Flexible duct shall have corrosion-resistant wire helix, bonded to an inner liner that prevents air from contacting the insulation, covered with minimum 1-1/2", 3/4 lb/cf density fiberglass insulation blanket, sheathed in a vapor barrier of metalized polyester film laminated to glass mesh. Usage: All areas unless noted otherwise. 2. Flexible duct shall have polymer wire helix, bonded to an inner liner that prevents air from contacting the insulation, covered with minimum 1-1/2" thick, 3/4 lb/cf density fiberglass insulation blanket, sheathed in a vapor barrier of polyester film laminated to glass mesh. Usage: MRI rooms. 3. Inner liner shall be airtight and suitable for 6" WC static pressure through 16" diameter. Outer jacket shall act as a vapor barrier only with permeance not over 0.1 perm per ASTM E96, Procedure A. "R" value shall not be less than 4.0 ft2*°F*hr/Btuh. Temperature range of at least 0-180°F. Maximum velocity of 4,000 fpm. 4. Usage: a. Take-offs from supply ducts to inlets of terminal air boxes. Do not exceed 36" in length. b. Connections to air inlets and outlets. Do not exceed 5'-0" in length. F. Acoustic: 1. Flexible duct shall be acoustic rated in accordance with ASTM E477 and ADC Test Code FD 72-RI by ETL. Insertion loss values noted below are for flow velocities less than 2,500 fpm. Submittals shall include insertion losses ratings per sizes and lengths listed below regardless of sizes shown on the drawings. 2. Flexible have corrosion-resistant wire helix, bonded to a nylon fabric core inner liner that prevents air from contacting the insulation, covered with minimum 1- 1/2", 3/4 lb/cf density fiberglass insulation blanket, sheathed in a vapor barrier of metalized polyester film laminated to glass mesh. Usage: All areas unless noted otherwise. 3. Inner liner shall be airtight and suitable for 6" WC static pressure through 16" diameter. Outer jacket shall act as a vapor barrier only with permeance not over 0.1 perm per ASTM E96, Procedure A. "R" value shall not be less than 4.0 ft2*ºF*hr/Btuh. Temperature range of at least 0-180ºF. Maximum velocity of 4,000 fpm. 4. Minimum Acoustic Insertion Losses per octave band: a. Straight Duct: Dia Length 63hz 125hz 250hz 500hz 1000hz 2000hz 4000hz 6" ø 6 ft 4.0 13 15 15 16 17 16 6" ø 3 ft 2.3 4.9 5.3 5.3 5.5 5.8 5.4 8" ø 6 ft 5.7 14 13 15 16 18 16 8" ø 3 ft 2.9 5.0 4.9 5.7 5.6 5.8 5.6 12" ø 6 ft 5.5 13 12 15 15 18 13 12" ø 3 ft 2.8 4.8 4.7 5.3 5.3 5.8 4.9 760 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 10 DUCTWORK b. 90deg Elbow: Dia Length 63hz 125h z 250h z 500h z 1000hz 2000hz 4000hz 6" ø 6 ft 10 15 16 17 18 17 18 6" ø 3 ft 3.8 5.4 5.5 5.7 5.9 5.8 5.9 8" ø 6 ft 10 15 16 17 16 18 18 8" ø 3 ft 2.4 5.3 5.6 5.8 5.6 5.9 6.0 12" ø 6 ft 11 14 15 16 15 16 15 12" ø 3 ft 4.4 5.1 5.3 5.5 5.4 5.6 5.3 5. Usage: a. Take-offs from supply ducts to inlets of terminal air boxes. Do not exceed 36" in length. b. Connections to air inlets and outlets. Do not exceed 5'-0" in length. c. Acceptable Manufacturers: 1) Flexmaster USA - Type 6 2) Thermaflex M-Ke G. Radius Forming Elbows: 1. Flexible plastic radius forming elbow for use with flexible ducts to create 90deg elbow. One size for 6" to 16" diameter ducts. UL listed for return plenum spaces. 2. Usage: All supply air terminals with flexible ductwork connection. 3. Installation: Attach to flex duct and secure draw bands without crushing flex duct to form smooth radius elbow. Suspend radius forming elbow to structure. Install per manufacturer's instructions. 4. Acceptable Manufacturers: a. Hart & Cooley - Smartflow b. Thermaflex - Flexflow c. Titus - Flexright PART 3 - EXECUTION 3.1 INSTALLATION A. Provide openings in ducts for thermometers and controllers. B. Locate ducts with space around equipment for normal operation and maintenance. C. Do not install ducts or other equipment above electrical switchboards or panelboards. This includes a dedicated space extending 25 feet from the floor to the structural ceiling with width and depth equal to the electrical equipment. Unless intended to serve these rooms, do not install any ductwork or equipment in electrical rooms, transformer rooms, electrical closets, telephone rooms or elevator machine rooms. 761 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 11 DUCTWORK D. Provide temporary closures of metal or taped polyethylene on open ducts to prevent dust from entering ductwork. E. Supply ductwork shall be free of construction debris, and shall comply with Level of the SMACNA Duct Cleanliness for New Construction Guidelines. F. Repair all duct insulation and liner tears. G. Install manual volume dampers in branch supply ducts so all outlets can be adjusted. Do not install dampers at air terminal device or in outlets, unless specifically shown. H. Insulate terminal air box reheat coils. Seal insulation tight to form a tight vapor barrier. I. Install flexible duct in accordance with the ADC Flexible Duct Performance and Installation Standards. J. Install all exterior ductwork per SMACNA Fig. 6-3. Where drawings do not indicate otherwise, ductwork seams and joints shall be sealed watertight and pitched to shed water. K. Support all duct systems in accordance with the SMACNA HVAC Duct Construction Standards: Metal and Flexible and the SMACNA Seismic Restraint Manual: Guidelines for Mechanical Systems, where applicable. Refer to Section 23 05 50 for seismic requirements. L. Install ducts with hangers and braces designed to withstand, without damage to equipment, seismic force required by California Building Codes. M. Adhesives, sealants, tapes, vapor retarders, films, and other supplementary materials added to ducts, plenums, housing panels, silencers, etc. shall have flame spread/smoke developed ratings of under 25/50 per ASTM E84, NFPA 255, or UL 723. N. All duct support shall extend directly to building structure. Do not support ductwork from pipe hangers unless coordinated with piping contractor prior to installation. Do not allow lighting or ceiling supports to be hung from ductwork or ductwork supports. 1. Shape: a. Rectangular Duct - Single Wall b. Round Snap-Lock Seam Ductwork - Single Wall 3.2 DUCTWORK SEALING A. General Requirements: 1. Openings, such as rotating shafts, shall be sealed with bushings or similar. 2. Pressure sensitive tape shall not be used as the primary sealant unless it has been certified to comply with UL-181A or UL-181B by an independent testing laboratory and the tape is used in accordance with that certification. 762 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 12 DUCTWORK 3. All connections shall be sealed including, but not limited to, taps, other branch connections, access doors, access panels, and duct connections to equipment. Sealing that would void product listings is not required. Spiral lock seams need not be sealed. 4. Mastic-based duct sealants shall be applied to joints and seams in minimum 3 inch wide by 20 mil thick bands using brush, putty knife, trowel, or spray, unless manufacturer's data sheet specifies other application methods or requirements. B. All ducts systems, regardless of pressure class, shall be Seal Class A as defined by Section 5-1 of SMACNA HVAC Air Duct Leakage Test Manual per the Energy Code, unless specifically noted otherwise. Seal Class A shall include sealing of all transverse joints, longitudinal seams, and duct wall penetrations with welds, gaskets, mastics, or fabric-embedded mastic system. Joints are inclusive of, but not limited to, girth joints, branch and sub-branch intersections, duct collar tap-ins, fitting subsections, louver and air terminal connections to ducts, access door and access panel frames and jambs, duct, plenum, and casing abutments to building structures. 3.3 TESTING A. Interior Duct - Less than 3" WG (positive or negative): 1. Leak testing of these pressure classes is not normally required for interior ductwork (inside the building envelope). However, leak tests will be required if, in the opinion of the Architect/Engineer, the leakage appears excessive. All exterior ductwork shall be tested. If duct has outside wrap, testing shall be done before it is applied. 2. Leak test shall be at the Contractor's expense and shall require capping and sealing all openings. 3. Seal ducts to bring the air leakage into compliance. 4. Contractor shall notify the Architect/Engineer five business days prior to pressurizing ductwork for testing. B. Interior Duct - 3" WG and Above (positive or negative): 1. A minimum of 25% of interior ductwork (inside the building envelope) shall be tested. The Owner or designated representative shall select the sections to be tested. If duct has outside wrap, testing shall be done before it is applied. 2. Duct system shall be completely pressure tested. If duct has outside wrap, testing shall be done before it is applied. 3. Leak test shall be at the Contractor's expense and shall require capping and sealing all openings. 4. Seal ducts to bring the air leakage into compliance. 5. Contractor shall notify the Architect/Engineer five business days prior to pressurizing ductwork for testing. C. Exterior Duct - 1/2" WG and Above (positive or negative): 1. All exterior ductwork (outside the building envelope) shall be completely pressure tested. If duct has outside wrap, testing shall be done before it is applied. 2. Leak test shall be at the Contractor's expense and shall require capping and sealing all openings. 3. Seal ducts to bring the air leakage into compliance. 763 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 31 00 - 13 DUCTWORK 4. Contractor shall notify the Architect/Engineer five business days prior to pressurizing ductwork for testing. D. Test Procedure: 1. Testing shall be as listed in the latest edition of the SMACNA HVAC Duct Leakage Manual, with the following additional requirements: a. The required leakage class for Seal Class A, rectangular ducts, shall be 4; round shall be 2. b. Test pressure shall be the specified duct pressure class. Testing at reduced pressures and converting the results mathematically is not acceptable. This is required to test the structural integrity of the duct system. c. If any leak causes discernible noise at a distance of 3 feet, that leak shall be eliminated, regardless of whether that section of duct passed the leakage test. d. All joints shall be felt by hand, and all discernible leaks shall be sealed. e. Totaling leakage from several tested sections and comparing them to the allowable leakage for the entire system is not acceptable. Each section must pass the test individually. f. Contractor shall notify the Architect/Engineer five business days prior to pressurizing ductwork for testing. Failure to notify the Architect/Engineer of pressure testing may require the contractor to repeat the duct pressure test after proper notification. g. Upon completion of the pressure test, the contractor shall submit an air duct leakage test summary report as outlined in the SMACNA HVAC Duct Leakage Test Manual. h. All access doors, taps to terminal air boxes, and other accessories and penetrations must be installed prior to testing. Including terminal air boxes in the test is not required. i. Positive pressure leakage testing is acceptable for negative pressure ductwork. 3.4 DUCTWORK PENETRATIONS A. All duct penetrations of firewalls shall have fire or fire/smoke dampers where required by code. B. Dampers shall be compatible with fire rating of wall assembly. Verify actual rating of any wall being penetrated with Architect/Engineer. C. Seal all duct penetrations of walls that are not fire rated by caulking or packing with fiberglass. Install trim strip to cover vacant space and raw construction edges of all openings in finished rooms. Install escutcheon ring at all round duct openings in finished rooms. Trim strips and rings shall be same material and finish as exposed duct. END OF SECTION 23 31 00 764 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 33 00 - 1 DUCTWORK ACCESSORIES SECTION 23 33 00 DUCTWORK ACCESSORIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Manual Volume Dampers. B. Fire Dampers. C. Backdraft Dampers. D. Fabric Connectors. E. Drip Pans. F. Duct Access Doors. G. Duct Test Holes. H. Remote Volume Control Devices. 1.2 REFERENCES A. ASTM E477-06a - Standard Test Method for Measuring Acoustical and Airflow Performance of Duct Liner Materials and Prefabricated Silencers. B. ASTM E2336-04 - Standard Test Methods for Fire Resistive Grease Duct Enclosure Systems. C. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers Version 1.1. D. NFPA 90A - Installation of Air-Conditioning and Ventilating Systems. E. SMACNA - HVAC Duct Construction Standards - Third Edition - 2005. 1.3 SUBMITTALS A. Submit shop drawings under provisions of Section 23 05 00. B. Submit manufacturer's installation instructions. C. Include UL ratings, California State Fire Marshal approval and NFPA 90A, dynamic ratings, leakage, pressure drop and maximum pressure data. 765 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 33 00 - 2 DUCTWORK ACCESSORIES D. Submit certification that ductwork accessories will withstand seismic forces defined in Section 23 05 50. Include the following: 1. Basis for Certification: Indicate whether certification is based on actual test of assembled components or on calculation. a. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified." b. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event." 2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. PART 2 - PRODUCTS 2.1 MANUAL VOLUME DAMPERS A. Fabricate in accordance with SMACNA Duct Construction Standards, and as indicated. B. Fabricate single blade dampers for duct sizes to 9-1/2 x 30 inches. C. Fabricate multi-blade damper of opposed blade pattern with maximum blade sizes 12" x 72". Assemble center and edge crimped blades in prime coated or galvanized channel frame with suitable hardware. D. Except in round ductwork 12 inches and smaller, provide end bearings. On multiple blade dampers, provide molded synthetic or oil-impregnated nylon or sintered bronze bearings. E. Provide locking quadrant regulators on single and multi-blade dampers. F. On insulated ducts, mount quadrant regulators on stand-off mounting brackets, bases, or adapters. G. If blades are in open position and extend into the main duct, mount damper so blades are parallel to airflow. 2.2 FIRE/SMOKE DAMPERS (FSD) A. General: 1. Furnish and install fire/smoke dampers in ducts, where shown on the drawings, at the point where they pass through a fire/smoke partition and in all other locations required by the local Fire Department, the National Fire Protection Association Pamphlet No. 90A, and all other applicable codes. 766 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 33 00 - 3 DUCTWORK ACCESSORIES 2. Fire Resistance Rating: Assemblies shall be 1-1/2 hour rated under UL Standard 555 unless noted otherwise on drawings. 3. Airflow Rating: Dynamic rated at 2,000 fpm and 4" WC. 4. Temperature Rating: Assemblies shall be UL 555S listed for use in smoke control system with a 250°F temperature rating. 5. Leakage Rating: Class II. Shall not leak over 20 cfm per square foot at 4" WC. 6. FSD dampers shall be furnished complete with factory-mounted actuators, and the damper/operator assemblies shall meet all requirements listed below. 7. Where dampers are located in aluminum or stainless steel duct, provide stainless steel dampers. 8. The complete assembly must be factory assembled, cycled and tested prior to shipment. 9. All operators shall be located with easy access for servicing. 10. Contractor to field verify actuator installation and clearance requirements prior to ordering. Actuator should not be taller than duct height. Rotate or turn over the actuator if this is the case. B. Construction: 1. Frame: 5 inches x minimum 16 gauge roll formed, galvanized steel hat-shaped channel, reinforced at corners. 2. Sleeve: Dampers shall be installed in sleeves of sufficient thickness to comply with UL555 Standard for Safety Fire Dampers listing of the damper. Where UL555 permits sleeve thickness to be the same as that of the duct gauge, such thickness shall not be less than that specified in NFPA 90A for breakaway style sleeves. If a breakaway style duct/sleeve connection is not used, the sleeve shall be a minimum of 16 gauge for dampers up to 36" wide by 24" high and 14 gauge for dampers exceeding 36" wide by 24" high. Damper sleeve shall not extend more than 6" beyond the firewall or partition unless damper is equipped with an actuator or factory installed access door. Sleeve may extend up to 16" beyond the firewall or partition on sides equipped with the actuator or factory installed access door. 3. Blades: Opposed blade; airfoil-shaped, single piece, minimum 14 gauge double skin. Galvanized steel. Maximum 6" damper blades. 4. Seals: Blade seal shall be silicone fiberglass material to maintain smoke leakage rating to minimum of 450°F and galvanized steel for flame seal to 1,900°F. Seal to be mechanically attached to blade edge. Jam seal shall be stainless steel, flexible metal compression type. 5. Bearings: Self-lubricating stainless-steel sleeve, in extruded hole in frame. 6. Axle: Minimum 1/2" plated steel, hex shaped, mechanically attached to blade. C. Electric Actuator: Externally mounted, electric direct coupled. Actuator shall be 24VAC. Wiring by Electrical Contractor. "Stall type" actuators are NOT acceptable. Actuator shall carry a manufacturers 5 year warranty. Fail to closed position. D. Remote Position Indication: Blade position indicator switches - Two position indicator switches linked directly to damper blade in order to allow remote indication of damper blade position at the firefighter smoke control panel and remote indicator panel mounted on ceiling below respective fire smoke damper. 767 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 33 00 - 4 DUCTWORK ACCESSORIES E. Access Door: Locate access door in ductwork for visual inspection and on the latch side to replace link easily. Each access door shall have a label with letters at least 1/2" high reading "FIRE/SMOKE DAMPER". F. Supplemental California Requirements: Furnish and install California State Fire Marshal approved combination smoke/fire dampers where shown on plans. The fire- releasing device must also be listed by the CSFM for use with the damper assembly. Melting fusible links are not acceptable. The dampers shall be provided in sleeves with pre-mounted motor actuators The motors must be FSLF120 Belimo, and both damper and motor are to have a minimum 5-year warranty. Dampers shall be rated for at least 20,000 complete cycles. Actuators shall draw no more than 27VA running or 10 VA holding for 70"/lb torque. Actuator operating time shall be 15 seconds or less to drive open or spring closed from 32°F. Actuator must reopen damper fully even if power failed for less than 2 seconds. The motors must be mounted on a bracket that allows for use of slip joint connections or "Duct-mate" type connections without modification. Provide Belimo Air Controls FSNF 120 actuator. All smoke/fire dampers shall be tested by the Contractor in the presence of the field inspector and the State Fire Marshal. This test shall be performed prior to the installation of the ceilings. 2.3 BACKDRAFT DAMPERS A. Gravity backdraft dampers, size 18 inches x 18 inches or smaller, furnished with air moving equipment, may be air moving equipment manufacturer's standard construction. B. Fabricate multi-blade, parallel action gravity balanced backdraft dampers of extruded aluminum, with blades of maximum 6 inch width, with felt or flexible vinyl sealed edges, linked together in rattle-free manner with 90° stop, and plated steel pivot pin; adjustment device to permit setting for varying differential static pressure. C. Models: 1. Ruskin CBD4 2. Arrow 655 3. Safe-Air/Dowco BRL 4. Greenheck EM. 2.4 FABRIC CONNECTORS A. Fabric connectors shall be installed between all fans or fan units and metal ducts or casings to prevent transfer of fan or motor vibration. B. The fabric connectors shall be completely flexible material which shall be in folds and not drawn tight. C. Fabric connectors shall be of glass fabric double coated with neoprene, with UL approval. Weight = 30 oz. per square yard minimum. Fabric shall not be affected by mildew and shall be absolutely waterproof, airtight and resistant to acids, alkalis, grease and gasoline, and shall be noncombustible. 768 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 33 00 - 5 DUCTWORK ACCESSORIES D. Fabric connections shall not exceed 6" in length on ductwork that has a positive pressure. On ductwork that has a negative pressure, the length shall not exceed 2" in length. E. All corners shall be folded, sealed with mastic and stapled on 1" centers. F. Unless otherwise shown on the drawings, the fabric connection at the inlet to centrifugal fans shall be at least one duct diameter from the fan to prevent inlet turbulence. G. Materials: 1. Durodyne MFN-4-100 2. Vent Fabrics, Inc. 3. "Ventglas" 4. Proflex PFC3NGA H. Fabric connectors exposed to sunlight and weather shall be as described above, except the coating shall be hypalon in lieu of neoprene. I. Materials: 1. Durodyne "Duralon MFD-4-100" 2. Vent Fabrics, Inc. 3. "Ventlon" 4. Proflex PFC3HGA 2.5 DRIP PANS A. Install drip pans under all rooftop exhaust fans, intake hoods, exhaust hoods and other roof penetrations that do not have ductwork below them to intercept dripping water. B. Drip pans shall be 22 gauge minimum cross-broken or reinforced sheet metal with 2" welded upturned lips. C. Pans shall extend 6" in all directions beyond the opening and shall have the top of the lip located 25% of the maximum throat dimension below the opening. D. Insulate interior of drip pan with 1" thick elastomeric foam insulation. Adhere foam to drip pan with standard foam adhesive. 2.6 DUCT ACCESS DOORS A. Fabricate per Fig. 7-2 and 7-3 of the SMACNA HVAC Duct Construction Standards and as indicated. B. Review locations prior to fabrication. Install access doors at fire dampers, smoke dampers, motorized dampers, fan bearings, filters, automatic controls, humidifiers, louvers, duct coils and other equipment requiring service inside the duct. 769 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 33 00 - 6 DUCTWORK ACCESSORIES C. Construction shall be suitable for the pressure class of the duct. Fabricate rigid, airtight, and close-fitting doors of materials identical to adjacent ductwork with sealing gaskets butt or piano hinges, and quick fastening locking devices. For insulated ductwork, install minimum one inch thick insulation with sheet metal cover. D. Access doors with sheet metal screw fasteners are not acceptable. E. Minimum size for access doors shall be 24" x 16" or full duct size, whichever is less. F. Provide duct access door in all horizontal return ductwork at 20 foot intervals per NFPA 90A. G. Fire Damper, Fire/Smoke Damper Access Provide quantity of access doors such that two hands can fit inside ductwork to manually reset fire dampers. For ducts larger than 12x12, provide one access door. For ducts 12" x 12" and smaller, provide one access door on bottom and one on side. 2.7 REMOTE VOLUME CONTROL DEVICES - MANUAL A. Remote volume control balancing damper shall be supplied with either miter gears or right angle worm gears. Provide all damper shafts, gearboxes, couplings, U-joints, bearings, shafts, offsets, adapters, and adjustable concealed covers as required. B. When distances, angles, or offsets prevent installing solid rods, the mechanical cable control system may be utilized. Provide all damper shafts, rack and pinion gear operator, cables and sleeves, and adjustable ceiling mounting cups. C. Manufacturers: 1. Young Regulator Company 2. Metropolitan Air Technology 2.8 DUCTWORK ACCESSORY SEALANTS A. Ductwork accessory sealants and adhesives shall conform to Section 23 31 00. B. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 770 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 33 00 - 7 DUCTWORK ACCESSORIES PART 3 - EXECUTION 3.1 INSTALLATION A. General Installation Requirements: 1. Install accessories in accordance with manufacturer's instructions. 2. Where duct access doors are located above inaccessible ceilings, provide ceiling access doors. Coordinate location with the Architect/Engineer. 3. Coordinate and install access doors provided by others. 4. Provide access doors for all equipment requiring maintenance or adjustment above an inaccessible ceiling. Minimum size shall be 24" x 24". 5. Provide duct test holes where indicated and as required for testing and balancing purposes. B. Manual Volume Damper: 1. Provide manual volume dampers at points on low pressure supply, return, and exhaust systems where branches are taken from larger ducts where indicated on drawings and as required for air balancing. Use splitter dampers only where indicated. 2. Provide ceiling access doors for manual volume dampers. When manual volume dampers are located above an inaccessible ceiling and an access door cannot be installed, provide a remote-controlled volume control device for operation of the damper. Coordinate location with the Architect/Engineer. C. Drain Pan: 1. Drain pans shall be installed per ASHRAE 62.1. a. All drain pans shall be field tested under normal operating conditions to ensure proper drainage. b. Field testing of drain pans is not required if units with factory installed drain pans have been certified (attested in writing) by the manufacturer for proper operation when installed as recommended. END OF SECTION 23 33 00 771 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 34 23 - 1 POWER VENTILATORS SECTION 23 34 23 POWER VENTILATORS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Roof Exhaust Fan. B. Rooftop Fan Curbs. C. In-Line Cabinet Fan. 1.2 QUALITY ASSURANCE A. Performance Ratings: Conform to AMCA 210 and bear AMCA Certified Rating Seal. B. Sound Ratings: AMCA 301, tested to AMCA 300. C. Fabrication: Conform to AMCA 99. D. Fan Energy Index (FEI): Fans shall meet or exceed the minimum FEI scheduled at the specified airflow, pressure, and air density (duty point). In no case shall the FEI at the specified duty point fall below 1.0. 1.3 REFERENCES A. AMCA 99 - Standards Handbook. B. AMCA 208 - Calculation of the Fan Energy Index (FEI). C. AMCA 210 - Laboratory Methods of Testing Fans for Rating Purposes. D. AMCA 230 - AMCA 230 - Laboratory Methods of Testing Air Circulating Fans for Rating and Certification. E. AMCA 300 - Test Code for Sound Rating Air Moving Devices. F. AMCA 301 - Method of Publishing Sound Ratings for Air Moving Devices. G. ANSI/AFBMA 9 - Load Ratings and Fatigue Life for Ball Bearings. H. ANSI/AFBMA 11 - Load Ratings and Fatigue Life for Roller Bearings. I. SMACNA - HVAC Duct Construction Standards, 1995 Edition. 772 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 34 23 - 2 POWER VENTILATORS 1.4 SUBMITTALS A. Submit shop drawings per Section 23 05 00. Include data on all fans and accessories. Submit sound power levels for both fan inlet and outlet at rated capacity. Submit motor ratings and electrical characteristics, plus motor and electrical accessories. Submit multi-speed fan curves including minimum and maximum fan speed with specified operating points clearly plotted. Submit the Fan Energy Index (FEI) at the selected duty point (ceiling and HVLS fans are exempt from FEI submittal requirements). B. Submit manufacturer's installation instructions. C. Submit electrical power/controls wiring diagrams and product data indicating general assembly, components, safety controls, and service connections. D. Submit certification that power ventilators, accessories, and components will withstand seismic forces defined in Section 23 05 50. Include the following: 1. Basis for Certification: Indicate whether certification is based on actual test of assembled components or on calculation. a. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified." b. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event." 2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. 3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements. 1.5 EXTRA STOCK A. Provide one (1) extra belt set for each fan unit per owner approval. PART 2 - PRODUCTS 2.1 ROOFTOP EXHAUST FAN - DIRECT DRIVEN A. Fan Wheel: Centrifugal type, aluminum or composite with backward inclined or airfoil blades, statically and dynamically balanced. B. Housing: Removable, spun aluminum dome or rectangular top, with square, one piece, aluminum base and curb cap with Venturi inlet cone. C. All steel parts galvanized or epoxy coated. Non-corrosive fasteners. D. Direct drive, motor mounted outside of air stream and ventilated with outside air. E. Aluminum or brass bird screen. Plastic mesh will not be allowed. 773 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 34 23 - 3 POWER VENTILATORS F. Furnish factory mounted and wired disconnect switch: Non-fusible type with thermal overload protection mounted inside fan housing, factory wired through an aluminum conduit. G. Disconnect provided by Electrical Contractor. H. Furnish solid-state dial speed controller. Mount and wire inside fan unless shown otherwise on the drawings. Provide permanent marking at balanced point. I. Furnish normally closed, electric motorized damper. Provide step-down transformer if required. Install and wire damper to open when fan runs. J. Manufacturers: 1. Cook "ACE-D" 2. Greenheck 2.2 ROOFTOP FAN CURBS A. Furnish and install prefabricated roof curbs for all rooftop fans. B. Size curb to match the curb cap of fan. C. Unitized construction, continuous arc welded corner seams. Insulated with 1-1/2" thick, 3 lb. density rigid fiberglass board. Damper support angle. Pressure treated wood nailer. D. 18-gauge galvanized steel construction. E. Curb without cant. 2.3 IN-LINE CABINET FAN A. Fiberglass lined, sheet metal housing, arranged for in-line installation. B. Rubber torsion motor mounts. C. Built-in backdraft damper. D. Centrifugal fan. E. Provide variable speed controller if shown on the drawings. F. Manufacturers: 1. Cook 2. Greenheck 774 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 34 23 - 4 POWER VENTILATORS PART 3 - EXECUTION 3.1 INSTALLATION A. Install in accordance with manufacturer's instructions. B. Secure roof exhausters with cadmium plated lag screws to roof curb. C. If manufacturer has no recommendations, secure roof exhaust fans to curbs with 1/4" lag bolts on 8" maximum centers. D. MC shall install and wire factory provided damper to open when the fan runs if the manufacturer does not provide an option to pre-wire the damper. END OF SECTION 23 34 23 775 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 37 00 - 1 AIR INLETS AND OUTLETS SECTION 23 37 00 AIR INLETS AND OUTLETS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Grilles And Registers. B. Linear Diffusers. C. Roof Curbs. 1.2 QUALITY ASSURANCE A. Test and rate performance of air inlets and outlets per ASHRAE 70. B. Test and rate performance of louvers per AMCA 500L-99. C. All air handling and distribution equipment mounted outdoors shall be designed to prevent rain intrusion into the airstream when tested at design airflow and with no airflow, using the rain test apparatus described in Section 58 of UL 1995. 1.3 REFERENCES A. AMCA 500-L-12 - Laboratory Methods of Testing Louvers for Rating. B. ANSI/ASHRAE 70 - Method of Testing for Rating the Air Flow Performance of Inlets and Outlets. C. SMACNA - Duct Construction Standards. 1.4 SUBMITTALS A. Submit product data under provisions of Section 23 05 00. B. Submit schedule of inlets and outlets indicating type, size, location, application, and noise level. C. Review requirements of inlets and outlets as to size, finish, and type of mounting prior to submitting product data and schedules of inlets and outlets. D. Submit manufacturer's installation instructions. E. Submit electrical power/controls wiring diagrams and product data indicating general assembly, components, safety controls, and service connections. 776 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 37 00 - 2 AIR INLETS AND OUTLETS 1.5 REGULATORY REQUIREMENTS A. Conform to ANSI/NFPA 90A. B. Conform to ASHRAE 90.1. 1.6 EXTRA STOCK A. Provide clean filters in all filter return grilles at time of installation per owner approval B. Provide one additional set of replacement filters for all filter return grilles. Deliver to Owner at job site per owner approval. PART 2 - PRODUCTS 2.1 AIR TERMINALS - GRILLES AND REGISTERS A. Reference to a grille means an air supply, exhaust or transfer device without a damper. B. Reference to a register means an air supply, exhaust or transfer device with a damper. C. The type of unit, margin, material, finish, etc., shall be as shown on the drawing schedule and suitable for the intended use. D. All margins shall be compatible with ceiling types specified (including 'Thin-Line' T-bar lay-in grid system). Any discrepancies in contract documents shall be brought to the attention of the Architect/Engineer, in writing, prior to Bid Date. Submission of Bid indicates ceiling and air inlet and outlet types have been coordinated. E. The capacity and size of the unit shall be as shown on the drawings. F. All units shall handle the indicated cfm as shown on the drawings while not exceeding an NC level of 25, referenced to 10-12 watts with a 10 dB room effect. Noise in classrooms may not exceed 35 dBA or 55 dBC per ANSI Standard S12.60-2002 and ASHRAE 70. G. Refer to the drawings for construction material, color and finish, margin style, deflection, and sizes of grilles and registers. H. Provide with 3/4" blade spacing. Blades shall have steel friction pivots to allow for blade adjustment, plastic pivots are not acceptable. I. Corners of steel grilles and registers shall be welded and ground smooth before painting. Aluminum grilles and registers shall have staked corners. J. Where specified to serve registers, provide opposed blade volume dampers operable from the face of the register. 777 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 37 00 - 3 AIR INLETS AND OUTLETS K. Where specified to have filters, provide with filter rack suitable for 2" thick MERV-8 pleated media filters. Grille border shall be fabricated from minimum 22 gauge steel or minimum 0.040-inch thick for aluminum grilles. Provide removable grille face with metal knurled knob or quarter turn fastener to allow for filter media replacement. L. Screw holes for surface fasteners shall be countersunk for a neat appearance. Provide concealed fasteners for installation in lay-in ceilings and as specified on the drawings. M. Manufacturers: 1. Titus 2. Price 3. Metalaire 4. Krueger 5. Anemostat 2.2 AIR TERMINALS - SQUARE MODULAR CORE DIFFUSERS A. Reference to a diffuser means an air supply device, ceiling mounted, that shall diffuse air uniformly throughout the conditioned space. B. The type of unit, margin, material, finish, etc., shall be as shown on the drawing schedule. C. All margins shall be compatible with ceiling types specified (including 'Thin-Line' T-bar lay-in grid system). Any discrepancies in contract documents should be brought to the attention of the Architect/Engineer, in writing, prior to bid date. Submission of bid indicates ceiling and air inlet and outlet types have been coordinated. D. The capacity and size of the unit shall be as shown on the drawings. E. All units shall handle the indicated cfm as shown on the drawings while not exceeding an NC level of 25, referenced to 10-12 watts with a 10 dB room effect. [Noise in classrooms may not exceed 35 dBA or 55 dBC per ANSI Standard S12.60-2002 and ASHRAE 70]. F. Modular core diffusers shall consist of an outer frame assembly to facilitate mounting and shall include an integral square collar to allow connection to the square duct. Where shown on the drawings, the diffuser shall be supplied with a square to round adapter. Flat-oval inlets are not acceptable for connection to flexible ducts. G. Each louvered module shall be removable to allow access to any damper or other component in or near the diffuser neck. H. The core's blade spacing shall be 1 inch on center. I. Manufacturers: 1. Titus 2. Price 3. Krueger 4. Anemostat 778 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 37 00 - 4 AIR INLETS AND OUTLETS 2.3 AIR TERMINALS - LINEAR DIFFUSERS A. Linear Bar Grille Diffusers: 1. The type of unit, margin size, material, finish, etc., shall be as shown on the Drawing Schedule. Flat-oval inlets are NOT acceptable for connection to flexible ducts. Provide sheet metal oval-to-round transition if required. 2. The capacity and size of the unit shall be as shown on the drawings. 3. All units shall handle the indicated cfm as shown on the drawings while not exceeding an NC level of 25, referenced to 10-12 watts with a 10 dB room effect per ANSI/ASHRAE 70. 4. Install T-bars on both sides of diffusers for lay-in ceiling system, install manufacturer frame for sheetrock or plaster ceiling system. Diffuser margins system shall be compatible with ceiling types specified, color to match ceiling system. Contractor shall coordinate margin types with ceilings prior to submitting shop drawings. 5. Provide with concealed fasteners for installation in the field. 6. Linear bar diffusers and mounting frames shall be furnished as one piece up to 6' in length. Provide auxiliary support per manufacturer's recommendations for slot diffusers greater than 4' in length. 7. A manual volume damper shall be furnished and installed by the Contractor in branch ductwork to each bar grille. Balancing dampers shall not be installed in supply plenum or at air outlet unless otherwise indicated on the drawings. 8. Diffuser length and width, bar width, and spacing between bars shall be as shown on the drawings. 9. Manufacturers: a. Krueger 1500/1600 b. Titus CT c. Metalaire 2000 d. Anemostat AL/TL 2.4 AIR TERMINALS - LINEAR DIFFUSER SUPPLY PLENUM A. Linear diffusers shall be provided with field fabricated or prefabricated supply plenums. Plenum shall be a minimum of 2-1/2" wider than total slot width, minimum length of slot, and minimum height of 10". Plenums with end fed duct connections shall not exceed 8' in length. The cross sectional area of the plenum shall be designed for a maximum velocity of 500 fpm and the aspect ratio shall be limited to a width-to-height ratio of less than 1.5. Plenums with side outlets shall be designed for a maximum velocity of 600 fpm and inlet ducts to plenum shall be spaced 5' on center maximum. Inlet ducts to plenums shall have a maximum velocity of 900 fpm. Flat-oval inlets are NOT acceptable for connection to flexible ducts. Provide sheet metal oval-to-round transition if required. B. Plenum shall be constructed with 24 gauge galvanized steel and shall have side inlets unless shown otherwise on the drawings. Refer to Ductwork Application Schedule in Section 23 31 00 for insulation requirements. 779 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 37 00 - 5 AIR INLETS AND OUTLETS 2.5 ROOF CURBS A. Furnish and install, where shown on the drawings, prefabricated roof curbs for all rooftop hood openings. B. Roof Mounting Curb: Curb shall be sized to match curb cap of the hood. Curb height as shown on drawings, minimum 14 gauge galvanized steel, one-piece construction, insulated, all welded, wood nailer. C. Curbs shall be unitized construction, 18 gauge galvanized steel, with continuous arc welded corner seams, insulated with 1-1/2" thick, 3 lb. density rigid fiberglass board and damper support angle. D. Curb without cant - suitable for use with membrane type roof. E. Curb with built-in cant with step for roof insulation. F. Manufacturers: 1. Same manufacturer as the equipment it serves or Pate, RPS, or Thy. PART 3 - EXECUTION 3.1 INSTALLATION A. General Installation Requirements: 1. Install items in accordance with manufacturers' instructions. 2. Check location of inlets and outlets and make necessary adjustments in position to conform to architectural features, symmetry, and lighting arrangement. 3. Install diffusers to ductwork with air tight connections. 4. Flexible ducts shall NOT be joined to flat-oval connections. Provide sheet metal oval-to-round transitions where required. 5. Supply grille and register blades shall be aimed in the field to provide adequate air distribution in the space. All return grilles and registers blades shall be oriented to minimize sight distance beyond installed device. B. Volume Damper: 1. Provide manual volume dampers on duct take-off to diffusers when there are multiple connections to a common duct. Locate volume dampers as far as possible from the air inlet or outlet. C. Maintaining Duct Cleanliness: 1. When grilles, registers, and diffusers are installed, Contractor shall prevent construction dust, dirt, and debris from entering ductwork as required by Section 23 05 00. END OF SECTION 23 37 00 780 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 40 00 - 1 AIR CLEANING SECTION 23 40 00 AIR CLEANING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Filters and Filter Media. B. Side Access Filter Housings. 1.2 QUALITY ASSURANCE A. Filter media shall be tested under ANSI/UL 900 and labeled. B. Provide all filters and filter banks by one manufacturer. C. Air filters shall be State Fire Marshal approved and of a listed type. Preformed filters having combustible framing shall be tested as a complete assembly. Air filters in all occupancies shall be Class 2 or better (as shown in the State Fire Marshal listing). Air filters shall be accessible for cleaning or replacement. 1.3 REFERENCES A. ANSI/UL 586 - Test Performance of High Efficiency Particulate, Air Filter Units. B. ASHRAE 26 - Guideline for Field Testing of General Ventilation Devices and Systems for Removal Efficiency In-Situ by Particle Size and Resistance to Flow. C. ASHRAE 52 - Method of Testing Air Cleaning Devices Used in General Ventilation for Removing Particulate Matter. D. ANSI/NFPA 70 - National Electrical Code. 1.4 SUBMITTALS A. Submit shop drawings per Section 23 05 00. Include data on media, performance, assembly and frames. B. Submit certification that all air cleaning devices, accessories, and components will withstand seismic forces defined in Section 23 05 50. Include the following: 1. Basis for Certification: Indicate whether certification is based on actual test of assembled components or on calculation. a. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified." 781 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 40 00 - 2 AIR CLEANING 2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. 1.5 EXTRA STOCK A. Provide a total of three (3) sets of filters for all units. 1. Provide clean filters in all units at time of installation. 2. Provide clean filters in all units at project final completion after all interior finishes are complete. 3. Provide one additional set of replacement filters for all units. Deliver to Owner at job site per owner approval. PART 2 - PRODUCTS 2.1 MERV 13 (85% EFFICIENT) RIGID FILTER - DISPOSABLE - TYPE F A. Pleated, rigid, disposable type with high density, fine fiberglass laminated to non- woven synthetic backing. Welded wire grid media support bonded to the filter media. Galvanized steel enclosing frame bonded to media periphery to eliminate air bypass. B. Maximum 12" thick cartridges with at least 14.5 square feet of media per square foot of face area. C. 80-85% efficiency and 98% arrestance per ASHRAE 52.1 or MERV 13 per ASHRAE 52.2. Maximum 0.60" WG initial resistance at 500 fpm face velocity. D. Manufacturers: 1. Camfil 2. Flanders 3. American Air Filter 2.2 SIDE ACCESS FILTER HOUSING A. 16 gauge welded galvanized steel construction with bracing and prepunched standing flanges on inlet and outlet. B. Full size, hinged access doors on each end of housing with 16 gauge galvanized steel, reinforced, positive sealing heavy duty latches and resilient gasketing. C. 16 gauge galvanized steel or extruded aluminum holding tracks. "U" shaped bearing channel. Replaceable woven pile seals for filters. D. Filter channel suitable for 1" or 2" thick prefilter and bag or cartridge type. E. Manufacturers: 1. Camfil 2. American Air Filter 782 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 40 00 - 3 AIR CLEANING 3. Flanders PART 3 - EXECUTION 3.1 INSTALLATION A. Install all products per manufacturers' instructions. B. Seal filter media to prevent passage of unfiltered air around filters with felt, rubber, or neoprene gaskets. C. Do not operate fan systems without filters. D. Install static pressure tips upstream and downstream of filters. Mount filter gauges on outside of filter housing or filter plenum, in accessible position. Adjust and calibrate. Every filter bank, including packaged units, shall have a filter gauge. E. Install four (4) high efficiency filter test holes, two upstream and two downstream, at all high efficiency filter banks in air handling units and ductwork (85% efficiency and higher). Coordinate location of test holes with Owner. END OF SECTION 23 40 00 783 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 1 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW SECTION 23 74 16.12 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW PART 1 - GENERAL 1.1 SECTION INCLUDES A. Packaged Rooftop Unit. B. Unit Controls. C. Roof Mounting Frame and Base. D. Economizers. E. Power Exhaust. 1.2 QUALITY ASSURANCE A. All insulation inside the unit and in the air stream must comply with the requirement of NFPA 90A (maximum flame spread of 25 and maximum smoke developed of 50). B. All units must be UL or ETL listed and must contain UL labeled components. C. Fans shall be tested and rated in cabinet in accordance with AMCA Standard 210. All fan assemblies shall be dynamically balanced in cabinet at final assembly. D. Conform to ASHRAE 90.1California Energy Code Title 24. E. All air handling and distribution equipment mounted outdoors shall be designed to prevent rain intrusion into the airstream when tested at design airflow and with no airflow, using the rain test apparatus described in Section 58 of UL 1995. 1.3 REFERENCES A. AHRI 210 - Unitary Air Conditioning Equipment. B. AHRI 240 - Air Source Unitary Heat Pump Equipment. C. AHRI 270 - Sound Rating of Outdoor Unitary Equipment. D. ASHRAE 37 - Methods of Testing for Rating Unitary Air Conditioning and Heat Pump Equipment. E. ANSI/ASHRAE/IES Standard 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. 784 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 2 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW F. NFPA 70 - National Electrical Code. G. UL - Underwriters' Laboratory. 1.4 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 23 05 00. B. Indicate electrical service and duct connections on shop drawings or product data. C. Submit manufacturer's installation instructions. D. Submit electrical power/controls wiring diagrams and product data indicating general assembly, components, safety controls, and service connections. E. Provide 8 octave maximum sound power levels at unit discharge and return connection. F. Submit certification that the packaged rooftop air conditioning units, accessories, and components will withstand seismic forces defined in Section 23 05 50. Include the following: 1. Basis for Certification: Indicate whether certification is based on actual test of assembled components or on calculation. a. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified." b. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event." 2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. 3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements. 1.5 DELIVERY, STORAGE, AND HANDLING A. Protect units from physical damage by storing off site until roof mounting frames are in place, ready for immediate installation of units. 1.6 OPERATION AND MAINTENANCE DATA A. Submit operation and maintenance data. B. Include manufacturer's descriptive literature, installation instructions, maintenance and repair data, and parts listing. 785 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 3 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW 1.7 WARRANTY A. Provide five (5) year manufacturer's warranty for compressors. 1.8 MAINTENANCE SERVICE A. Contractor shall furnish complete service and maintenance of packaged roof top units for one year from Date of Substantial Completion. B. Provide maintenance service with a two-month interval as maximum time period between calls. Provide 24-hour emergency service on breakdowns and malfunctions. C. Include maintenance items as outlined in manufacturer's operating and maintenance data, including minimum of four (quarterly) filter replacements, minimum of one fan belt replacement, and controls checkout, seasonal adjustments, and recalibrations. D. Submit copy of service call work order or report and include description of work performed to Owner and Architect/Engineer. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Basis of Design: The scheduled manufacturer is the Basis of Design. The Contractor is responsible for all costs, schedule impacts, and construction coordination, including design costs and regulatory agency approvals, related to using a specified alternate product other than the Basis of Design. Refer to Section 23 05 00 for additional information. B. Carrier C. Ruud 2.2 MANUFACTURED UNITS A. Provide roof-mounted units having electric refrigeration. B. Unit shall be self-contained, packaged, factory assembled, pre-wired and tested, consisting of cabinet and frame, supply fan, exhaust fan, controls, air filters, refrigerant cooling coil and compressor, condenser coil, condenser fan, and a full refrigerant charge. C. Unit shall be furnished with non-fused disconnect switch, short fuse protection of all internal electrical components, and all necessary motor starters, contactors, and over- current protection. 786 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 4 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW 2.3 FABRICATION A. Cabinet: Galvanized steel with baked enamel finish, access doors or removable access panels with quick fasteners screwdriver operated flush cam type. Access doors shall be provided at each section (e.g., filter section, supply fan section, etc.). All exterior access panels must be permanently labeled on the outside indicating what is behind the panel. Structural members shall be minimum 18 gauge, with access doors or removable panels of minimum 20 gauge. B. Outside Air Intakes: The outside air intakes shall be located a minimum of 15 inches above the roof mounting curb to minimize the effect of heat pickup from the roof during the natural cooling cycle and the effects of snow on the roof during winter operation. Each air intake shall be furnished with rain eliminators. C. Insulation: Minimum of 1/2" thick, 1.5 lb./cu.ft. density coated glass fiber insulation on surfaces where conditioned air is handled. Protect edges from erosion. 2.4 ROOF MOUNTING FRAME AND BASE A. Roof Mounting Curb: Minimum 24 inches high, minimum 14 gauge galvanized steel, one-piece construction, insulated, all welded, wood nailer. 2.5 FANS/MOTORS A. Fans: 1. Supply Fans: Centrifugal 2. Exhaust Fans: Propeller 3. All fans shall be aluminum or composite construction with fan shaft: turned, ground and polished steel; keyed to wheel hub. 4. Direct drive motor. 5. All fan bearings must be capable of being lubricated by easily accessible grease fittings. 6. All fans must be statically and dynamically balanced. B. Motors: 1. Motors shall be open drip-proof with grease lubricated bearings. 2. Motors shall be "variable frequency drive rated" when controlled by VFDs. Refer to Section 23 05 13. 3. No equipment shall be selected or operate above 90% of its motor nameplate rating. 4. Motor shall have 1.15 service factor. 5. ECM motors may be provided. C. Belt Drive Fans: 1. Belt drive fans must be within ± 10% of scheduled RPM. 2. Belt drive fans shall have slide rails, adjusting screws, anchor bolts, and bedplates. 787 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 5 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW 3. Drives shall be V-belt type with adjustable pitch sheaves for units 20 HP and below. On units over 20 HP, use fixed sheaves. This Contractor shall provide replacement sheaves and belts as required to allow final air balancing. 4. Units used with variable speed drives shall have fixed sheaves. This Contractor shall provide replacement sheaves and belts as required to allow final air balancing. 2.6 EVAPORATOR COIL A. Provide copper tube with aluminum fin coil assembly. B. Install a drain pan under each cooling coil meeting requirements as outlined in ASHRAE 62.1. The drain pans shall extend the entire width of each coil, including piping and header if in the air stream. The length shall be as necessary to limit water droplet carryover beyond the drain pan to 0.0044oz per ft2 of face area per hour under peak sensible and peak dew point design conditions, considering both latent load and coil face velocity. Pitch drain pans in two directions towards the outlet, with a slope of at least 1/8" per foot. C. Provide capillary tubes or thermostatic expansion valves for units of 6 tons capacity and less, and thermostatic expansion valves and alternate row circuiting for units 7.5 tons cooling capacity and larger. D. Provide insulation on liquid refrigerant and suction piping between compressor and evaporator coil where not protected by drain pans. Insulation shall be elastomeric cellular foam; ANSI/ASTM C534; flexible plastic; 0.27 maximum 'K' value at 75°F, 25/50 flame spread/smoke developed rating when tested in accordance with ASTM E84 (UL 723). Maximum 1" thick per layer where multiple layers are specified. E. Drain Pan Condensate Overflow Switch: Float with integral magnet overflow switch conforming to UL508. Factory installed in drain pan and wired to shut the rooftop unit down with a fault alarm. No standby power required. 2.7 COMPRESSOR A. Provide hermetic or semi-hermetic compressors (quantity as scheduled on drawings), 3600 rev/min maximum, resiliently mounted with positive lubrication, high and low pressure safety controls, motor overload protection, suction and discharge service valves and gauge ports, and filter drier. B. Five minute timed off circuit shall delay compressor start. C. For heat pump units, provide reversing valve, suction line accumulator, flow control check valve, and solid-state defrost control utilizing thermistors. D. The use of hydrochlorofluorocarbon (HCFC) or chlorofluorocarbon (CFC) based refrigerants is prohibited. 788 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 6 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW 2.8 CONDENSER A. Condenser shall provide design capacity between the minimum and maximum ambient conditions scheduled on the drawings. B. Condenser Coil: 1. Round Copper Tube and Aluminum Fins: Construct condenser coils of aluminum fins mechanically bonded to seamless copper tubing. Air test under water to 450 psig. Coils and frame shall include 5000+ hour salt spray resistance (ASTM B117-90). C. Condenser Fans: Provide direct drive low noise blade design propeller fans, resiliently mounted with fan guard, motor overload protection, wired to operate with compressor. D. Condenser Motors: Fan motors shall be an ECM type motor for proportional control. The motor shall include thermal overload protection and protect the motor in the case of excessive motor temperatures. The motor shall have phase failure protection and prevent the motor from operation in the event of a loss of phase. E. Entire fan assembly shall be statically and dynamically balanced. F. Provide refrigerant pressure switches to cycle condenser fans. G. Provide hail guards on all condenser coils. H. Liquid and discharge isolation valves with staged and digital scrolls. 2.9 MIXING SECTION A. Dampers: Provide outside, return, and relief dampers with damper operator and control package to automatically vary outside air quantity. Outside air damper shall fail to closed position. 2.10 ECONOMIZERS A. Factory installed by approved rooftop unit manufacturer with fully modulating motorized outside air and return air dampers. B. Shall be equipped with 100% capable relief barometric damper relieving up to 100% return air and sealed to meet ASHRAE 90.1 requirements. C. Shall be capable of introducing up to 100% outside air. D. Shall maintain minimum airflow into the building during occupied period and provide design ventilation rate for full occupancy. E. Dampers shall be capable of completely closing when unit is in unoccupied mode. F. Outside air damper normally closed and return air damper normally open. 789 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 7 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW G. Provide factory installed and tested, outdoor air monitor that controls outdoor air ± 15% accuracy down to 40 cfm per ton. H. Economizer assembly shall be California Title 24 compliant. controls shall display a warning, if the economizer malfunctions in accordance with Title 24 specifications. I. Provide a field installed duct/space-mounted C02 sensor. Outside air damper position shall modulate between the demand control ventilation limit (minimum position setpoint) and the ventilation limit (maximum non-economizer position setpoint) to satisfy the space requirements. Damper position shall be controlled to the greater of the two command signals, either minimum outside airflow or space IAQ (CO2). J. Economizer Fault Detection and Diagnostics (FDD): 1. Air-cooled unitary direct-expansion units that are equipped with an economizer shall include a fault detection and diagnostics system complying with the following: a. The following temperature sensors shall be permanently installed to monitor system operation: 1) Outside air. 2) Supply air. 3) Return air. b. Temperature sensors shall have an accuracy of ±2°F over the range of 40°F to 80°F. c. Refrigerant pressure sensors, where used, shall have an accuracy of ± 3 percent of full scale. d. The unit controller shall be configured to provide system status by indicating the following: 1) Free cooling available. 2) Economizer enabled. 3) Compressor enabled. 4) Heating enabled. 5) Mixed air low limit cycle active. 6) The current value of each sensor. e. The unit controller shall be capable of manually initiating each operating mode so that the operation of compressors, economizers, fans, and the heating system can be independently tested and verified. f. The fault detection and diagnostics system shall be configured to detect the following faults: 1) Air temperature sensor failure/fault. 2) Not economizing when the unit should be economizing. 3) Economizing when the unit should not be economizing. 4) Damper not modulating. 5) Excess outdoor air. 790 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 8 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW g. The unit shall be configured to report faults to a fault management application available for access by day-to-day operating or service personnel or annunciated locally on zone thermostats. 2.11 POWER EXHAUST A. Factory installed by economizer supplier or compatible equivalent. B. Controlled by economizer controls. C. Power exhaust shall be factory wired to electrical section complete with conduit, feeders, disconnect, and overcurrent protection. Power exhaust shall be energized based on building pressure or when dampers open past the adjustable setpoint of the economizer control. D. Must comply with Energy Code Fan Power Limitation formula. E. Fans: 1. All fans shall be aluminum or composite construction with fan shaft: turned, ground and polished steel; keyed to wheel hub. 2. Fan and motor assemblies shall be resiliently mounted 3. Direct drive motor. 4. All fan bearings must be capable of being lubricated by easily accessible grease fittings. 5. All fans must be statically and dynamically balanced. F. Motors: 1. Motors shall be open drip-proof with grease lubricated bearings. 2. Motors shall be "variable frequency drive rated" when controlled by VFDs. Refer to Section 23 05 13. 3. No equipment shall be selected or operate above 90% of its motor nameplate rating. 4. Motor shall have 1.15 service factor. 5. ECM motors may be provided. 2.12 ELECTRICAL A. Provide with single point power connection to service all controls, dampers, outlet, and fans, complete with non-fused disconnect switch, short circuit protection of all internal electrical components, and all necessary motor starters, contactors, and over-current protection, transformer. B. All units must be so constructed that when the electrical section access panel is opened, all electrical power to the unit (with the exception of the 120 volt duplex convenience outlet) is disconnected by means of a single disconnect. 791 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 9 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW C. All wiring must be labeled, numbered, and terminate in "spade clips". All terminal strips must be keyed to the wiring numbers. Each control device must be permanently labeled to indicate its function. D. Wiring diagrams for all circuits must be permanently affixed to the inside of the electrical section access panel. The markings of terminal strips and wiring must agree with the numbering on the wiring diagrams. E. All units shall include a transformer for controls and convenience outlet. F. Only one power cable connection to the unit shall be necessary. G. Motor shall include phase failure protection and prevent the motor from operation in the event of phase loss. 2.13 OPERATING CONTROLS - SINGLE ZONE UNITS A. When ECM are applied: 1. Single Zone VAV: The unit controller shall proportionally control the ECM motors on the supply fan based on space temperature. The unit controller shall increase/decrease the speed of the supply fan in order to maintain the space temperature within its setpoint and deadband. The unit controller shall provide discharge air temperature control with the compressor modulation. B. When variable speed drives are applied: 1. Single Zone VAV: An electronic variable frequency drive shall be provided for the supply air fan. Each drive shall be factory installed out of the airstream in a conditioned cabinet. Drives shall meet UL Standard 95-5V. The completed unit assembly shall be listed by a recognized safety agency, such as ETL. Drives are to be accessible through a hinged door assembly. Mounting arrangements that expose drives to high temperature unfiltered ambient air are not acceptable. C. Room thermostat shall incorporate: 1. Automatic switching from heating to cooling. 2. Preferential rate control to minimize overshoot and deviation from set point. 3. Set-up for four separate temperatures per day. 4. Short cycle protection. 5. Programming based on weekdays, Saturday and Sunday. 6. Switch selection features including imperial or metric display, 12 or 24 hour clock, keyboard disable, remote sensor, fan on-auto. D. Room thermostat display shall include: 1. Time of day. 2. Actual room temperature. 3. Programmed temperature. 4. Programmed time. 792 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 74 16.12 - 10 PACKAGED ROOFTOP AIR CONDITIONING UNITS 25 TON AND BELOW 5. Duration of timed override. 6. Day of week. 7. System model indication: heating, cooling, auto, off, fan auto, fan on. 8. Stage (heating or cooling) operation. E. Provide low limit sequence to close outside air dampers and stop supply fan. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that roof is ready to receive work and opening dimensions are as indicated on shop drawings and illustrated by the manufacturer. B. Verify that proper power supply is available. 3.2 INSTALLATION A. Install in accordance with manufacturer's instructions. B. Mount units on factory built roof mounting curb and provide watertight enclosure to protect ductwork and utility services. Install unit level. C. All field wiring shall be in accordance with the National Electrical Code. D. P-traps must be provided for all drain pans. E. Comb all coils to repair bent fins. F. Contractor shall coordinate unit access stair and walkway placement to ensure compliance with OSHA requirements. 3.3 MANUFACTURER'S FIELD SERVICES A. Provide initial start-up and shutdown during first year of operation. END OF SECTION 23 74 16.12 793 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 1 SPLIT SYSTEM AIR CONDITIONING UNITS SECTION 23 81 26 SPLIT SYSTEM AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Split system air conditioning wall, and/or ceiling-concealed units. 1.2 REFERENCES A. ARI 210 - Unitary Air Conditioning Equipment B. ARI 240 - Air Source Unitary Heat Pump Equipment C. ANSI NFPA 90A - Installation of Air Conditioning and Ventilation Systems. D. ANSI/ASHRAE 62.1 - Ventilation for Acceptable Indoor Air Quality. E. ANSI/NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum). F. ASHRAE 52 - Air Cleaning Devices Used in General Ventilation for Removing Particulate Matter. G. ASTM B1003 - Standard Specification for Seamless Copper Tube for Linesets. H. FS TT-C-490 - Cleaning Method and Pretreatment of Ferrous Surfaces for Organic Coatings. I. UL - Underwriters' Laboratories. 1.3 SUBMITTALS A. Submit shop drawings under provisions of Section 23 05 00. B. Indicate drain, electrical, and refrigeration rough-in connections on shop drawings or product data. C. Submit manufacturer's installation instructions. D. Submit certification that split system air conditioning equipment, accessories, and components will withstand seismic forces defined in Section 23 05 50. Include the following: 1. Basis for Certification: Indicate whether certification is based on actual test of assembled components or on calculation. 794 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 2 SPLIT SYSTEM AIR CONDITIONING UNITS a. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified." b. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event." 2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. 1.4 DELIVERY, STORAGE, AND HANDLING A. Accept units and components on site in factory protective containers, with factory shipping skids and lifting lugs. Inspect for damage. B. Comply with manufacturer's installation instruction for rigging, unloading, and transporting units. C. Protect units from weather and construction traffic by storing in dry, roofed location until units are ready for immediate installation. 1.5 REGULATORY REQUIREMENTS A. Conform to ANSI/NFPA 90A for the installation of computer room air conditioning units. B. Conform to ASHRAE 90.1 (latest published edition) - Energy Standard for Buildings Except Low-Rise Residential Buildings. 1.6 OPERATION AND MAINTENANCE DATA A. Submit operation and maintenance data. B. Include manufacturer's descriptive literature, operating instructions, installation instructions, and maintenance and repair data. 1.7 WARRANTY A. Provide five (5) year manufacturer's warranty on all compressors. PART 2 - PRODUCTS 2.1 SPLIT SYSTEM WALL A. Manufacturers: 1. Carrier/Toshiba 2. LG 3. Samsung 4. Trane/Mitsubishi 795 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 3 SPLIT SYSTEM AIR CONDITIONING UNITS 5. York/Hitachi 6. Lennox B. Manufactured Units: 1. Provide packaged, air-cooled, factory assembled, pre-wired and pre-piped unit consisting of cabinet, fans, filters, remote condensing unit, and controls. Wall- mounted units shall be furnished with integral wall mounting bracket and mounting hardware. 2. Assemble unit for wall-mounted or ceiling installation with service access required. 3. Performance shall be as scheduled on the drawings. 4. Unit shall be rated per AHRI Standards 210/240 and listed in the AHRI directory as a matched system. 5. Provide unit with factory-supplied cleanable air filters. 6. The units shall be listed by Electrical Laboratories (ETL) in accordance with UL- 1995 certification and bear the ETL label. 7. All wiring shall be in accordance with the National Electric Code (NEC). C. Evaporator Cabinet and Frame: 1. Cabinet: a. Refer to schedule on drawings for mounting type (wall-mounted, or ceiling concealed). b. Exposed units shall have a finished appearance with concealed refrigerant piping, condensate drain piping, and wiring connections. D. Evaporator Fans and Motors: 1. Fans: a. The evaporator fan shall be direct drive with a single motor having permanently lubricated bearings. b. The fan shall be statically and dynamically balanced. c. The indoor fan shall have at least three speeds. 2. Motor: a. Direct driven, digitally controlled with multiple speeds. Permanently lubricated with internal overload protection. E. Evaporator Coils (Direct Expansion): 1. Direct expansion cooling coil of seamless copper tubes expanded into aluminum fins. 2. Single refrigeration circuit with externally equalized expansion valve. 3. Coils shall be pressure tested at the factory. 4. A sloped, corrosion-resistant condensate pan with drain shall be provided under the coil. 796 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 4 SPLIT SYSTEM AIR CONDITIONING UNITS F. Electrical Panel: 1. Service Connections, Wiring, and Disconnect Requirements: Conform to the National Electrical Code and local electrical codes. G. Control: 1. The unit shall have a hard-wired 7-day programmable remote controller to operate the system. Provide wall mounting bracket for controller. 2. Remote controller shall have "automatic", "dry" (dehumidification), and "fan only" operating modes. 3. The remote controller shall have the following features: a. On/Off power switch. b. Mode Selector to operate the system in auto, cool, heat, fan, or dehumidification (dry) operation. c. Fan Setting to provide multiple fan speeds. d. On/Off Timer for automatically switching the unit off or on. e. Temperature Adjustment allows for the increase or decrease of the desired temperature. f. Powerful Operation to allow quick cool down or heating up in the desired space to achieve maximum desired temperature in the shortest allowable time. 4. The indoor unit microprocessor shall have the capability to receive and process commands via return air temperature and indoor coil temperature sensors enabled by commands from the remote controller. H. Outdoor Unit: 1. General: a. The outdoor unit shall be specifically matched to the corresponding indoor unit size. The outdoor unit shall be completely factory assembled and pre- wired with all necessary electronic and refrigerant controls. 2. Cabinet: a. The outdoor unit shall be fabricated of galvanized steel, bonderized and coated with a baked enamel finish for corrosion protection. 3. Fan: a. The fan shall be direct drive, propeller type fan with fan guard. b. Fan blades shall be statically and dynamically balanced. c. The fan shall have permanently lubricated type bearings. d. Motor shall be protected by internal thermal overload protection. e. Airflow shall be horizontal discharge. 797 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 5 SPLIT SYSTEM AIR CONDITIONING UNITS 4. Coil: a. The outdoor coil shall be nonferrous construction with corrugated fin tube. b. The coil shall be protected with an internal guard. c. Refrigerant flow from the condenser shall be controlled via a metering device. 5. Compressor: a. Hermetic or scroll refrigerant compressors with resilient suspension system, inverter driven, oil strainer, sight glass/moisture indicator, internal motor protection, high pressure switch, and crankcase heater. b. The outdoor unit shall have an accumulator and four-way reversing valve. 6. Refrigerant: a. Unit shall use R-410a. b. The use of chlorofluorocarbon (CFC)-based refrigerants is prohibited. I. Integral Condensate Pump: 1. Packaged unit matched to evaporator unit including float switch, pump, motor assembly, check valve, and reservoir. 2. Provide alarm to indicate high level reservoir. 3. Unit shall be powered from evaporator unit with appropriate field connections available. 2.2 PIPING A. Design Pressure: 450 psig; Maximum Design Temperature: 250°F B. Type ACR Seamless Copper Tube Linesets; Brazed Joints: 1. 3/4" and under. 2. Tubing: Type ACR seamless copper tube linesets, ASTM B1003. Sizes indicated are nominal designation. 3. Joints: Brazed with silver solder. 4. Fittings: Wrought copper solder joint, ANSI B16.22. 5. Special Requirements: All tubing shall be cleaned, dehydrated, pressurized with dry nitrogen, plugged, and tagged by manufacturer "for refrigeration service". During brazing operations, continuously purge the interior of the pipe with nitrogen to prevent oxide formation. 6. Limitations: a. Only between refrigerant splitter box and indoor terminal unit. b. For use above ceiling only. Do not use in exposed areas. C. Type ACR Hard Drawn Seamless Copper Tube; Brazed Joint: 1. 4" and under. 798 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 6 SPLIT SYSTEM AIR CONDITIONING UNITS 2. Tubing: Type ACR hard drawn seamless copper tube, ASTM B280. Sizes indicated are nominal designation. 3. Joints: Brazed with silver solder. 4. Fittings: Wrought copper solder joint, ANSI B16.22. 5. Special Requirements: All tubing shall be cleaned, dehydrated, pressurized with dry nitrogen, plugged and tagged by manufacturer "for refrigeration service". During brazing operations, continuously purge the interior of the pipe with nitrogen to prevent oxide formation. 2.3 INSULATION A. EPDM (NBR/PVC Blend is not permitted) elastomeric cellular foam; ANSI/ASTM C534; flexible plastic; 0.25 maximum 'K' value at 75°F, 25/50 flame spread/smoke developed rating when tested in accordance with ASTM E84 (UL 723). Minimum 1/2" thick for pipe sizes less than 1-1/4" and 3/4" thick for pipe sizes 1-1/4" and above. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that proper power supply is available. 3.2 INSTALLATION A. General Installation Requirements: 1. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment. 2. Install units in accordance with manufacturer's instructions. Install all units level and plumb. Indoor units shall be installed using manufacturer's standard mounting hardware securely fastened to building structure. 3. Coordinate the exact mounting location of all indoor and outdoor units with architectural and electrical work. Coordinate installation of ceiling-mounted units with ceiling grid layout. Provide additional ceiling grid reinforcement or modification as required and coordinate the work with the GC. Locate the indoor unit where it is readily accessible for maintenance and filter changes. Where outdoor units are located on the roof, locate at least 10' from the roof edge. 4. Verify locations of wall-mounted remote controllers with drawings and room details before installation. Coordinate mounting heights to be consistent with other wall-mounted devices. Height above finished floor shall not exceed 48". B. Condensate Removal: 1. Install condensate piping with trap and route from drain pan to nearest drain. Discharge to nearest code-approved receptor or to a properly vented indirect waste fitting. Flush all piping before making final connections to units. C. Comb all coils to repair bent fins. D. Install new filters in the unit at Substantial Completion. 799 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 7 SPLIT SYSTEM AIR CONDITIONING UNITS E. A factory-authorized service agent shall assist in commissioning the unit and inspecting the installation prior to startup. Submit startup report with O&M manuals. 3.3 REFRIGERANT PIPING A. Install refrigerant piping from the indoor unit(s) to the condensing unit. Refrigerant pipe sizes, lengths, specialties and configurations shall be as recommended by the manufacturer. Evacuate refrigerant piping and fully charge system with refrigerant per manufacturer's requirements. B. Provide weather-tight insulated roof curb to accommodate refrigerant piping and conduit roof penetrations. C. Insulate all refrigerant piping. Both liquid and suction lines shall be insulated between the indoor and outdoor units. D. Joining of Piping: 1. Brazed Joints: a. Make up joints with brazing filler metal conforming to ANSI/AWS A5.8. Cut copper tubing ends perfectly square and remove all burrs inside and outside. Thoroughly clean sockets of fittings and ends of tubing to remove all oxide, dirt, and grease just prior to brazing. Apply flux evenly, but sparingly, to all surfaces to be joined. Brazing filler metal with a flux coating may also be used. Heat joints uniformly to proper brazing temperature so braze filler metal flows to all mated surfaces. Wipe excess braze filler metal, leaving a uniform fillet around cup of fitting. b. Flux shall conform to ANSI/AWS A5.31. c. Remove composition discs and all seals during brazing if not suitable for a minimum of 840°For greater than the melting temperature of the brazing filler metal, whichever is greater. E. Insulation: 1. Insulate all refrigerant pipes between the heat pump and indoor units. This includes the liquid pipe, the suction pipe, the hot gas pipe, and the high/low pressure gas pipe. All fittings, valves, and specialty refrigerant components in the piping between the indoor and heat pump units shall also be insulated. The insulation shall have a continuous vapor barrier and shall pass through hangers and supports unbroken. All exterior insulated piping shall be painted with minimum of one (1) coat of UV resistant paint. Over size hangers and supports to allow the insulation to pass through unbroken. Following are the minimum insulation thicknesses unless noted otherwise in the manufacturer's literature or required by local AHJ: a. Refrigerant Suction (40°F & Below): 1) Up to 1": 1/2" 2) 1" and up: 1" 800 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 23 81 26 - 8 SPLIT SYSTEM AIR CONDITIONING UNITS b. Refrigerant Suction (41°F to 60°F): 1) Up to 1-1/2": 1/2" 2) 1-1/2" and up: 1" c. Refrigerant Liquid: 1) Up to 1-1/2": 1" 2) 1-1/2" and up: 1-1/2" 2. California Title 24 - 2019: a. Refrigerant Suction (40°F & Below): 1) Up to 1": 1" 2) 1" and up: 1-1/2" b. Refrigerant Suction (41°F to 60°F: 1) Up to 1-1/2": 1/2" 2) 1-1/2" and up: 1" c. Refrigerant Low Pressure Gas (141°F to 200°F): 1) Up to 1-1/2": 1-1/2" 2) 1-1/2" and up: 2" d. Refrigerant High Pressure Gas (201°F to 250°F): 1) Up to 4": 2-1/2" e. Refrigerant Liquid: 1) Up to 1": 1" 2) 1" and up: 1-1/2" END OF SECTION 23 81 26 801 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 1 BASIC ELECTRICAL REQUIREMENTS SECTION 26 05 00 BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Requirements applicable to all Division 26 Sections. Also refer to Division 1 - General Requirements. This section is also applicable to Interior Communications Pathways Section 27 05 28. This section is also applicable to Fire Alarm and Detection Systems Section 28 31 00. B. All materials and installation methods shall conform to the applicable standards, guidelines and codes referenced herein and within each specification section. 1.2 REFERENCES A. NFPA 70 - National Electrical Code (NEC) B. CEC California Electrical Code C. CCR California Code of Regulation D. CBC California Building Code E. CFC California Fire Code F.CMC California Mechanical Code G. CPC California Plumbing Code H. California Title 24 - Building Energy Efficiency Standards I. SCAQMD South Coast Air Quality Management District 1.3 SCOPE OF WORK A. This Specification and the associated drawings govern furnishing, installing, testing and placing into satisfactory operation the Electrical Systems. B. The Contractor shall furnish and install all new materials as indicated on the drawings, and/or in these specifications, and all items required to make the portion of the Electrical Work a finished and working system. C. All work will be awarded under a single General Contract. The division of work listed below is for the Contractor's convenience and lists normal breakdown of the work. D. Description of Systems shall be as follows: 802 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 2 BASIC ELECTRICAL REQUIREMENTS 1. Electrical power system to and including luminaires, equipment, motors, devices, etc. 2. Grounding system. 3. Fire alarm system. 4. Security system. 5. Wiring system for temperature control system as shown on the drawings. 6. Wiring of equipment furnished by others. 7. Removal work and/or relocation and reuse of existing systems and equipment. 8. Telecommunications rough-in, as shown on drawings, for installation of telecommunications equipment by others under separate contract. 9. Technology Systems as described in Division 27/28 and on the T-series documents as described in the Suggested Matrix of Scope Responsibility. 10. Furnish and install firestopping systems for penetrations of fire-rated construction associated with this Contractor's work. E. Work Not Included: 1. Telecommunications cabling will be by Division 27, in raceways and conduits furnished and installed as part of the Electrical work. 2. Temperature control wiring for plumbing and HVAC equipment (unless otherwise indicated) will be by other Contractors. 1.4 WORK SEQUENCE A. Itemize all work and list associated hours and pay scale for each item. 1.5 DIVISION OF WORK BETWEEN MECHANICAL, ELECTRICAL, and CONTROL CONTRACTORS A. Division of work is the responsibility of the Prime Contractor. Any scope of work described at any location on the contract document shall be sufficient for including said requirement in the project. The Prime Contractor shall be solely responsible for determining the appropriate subcontractor for the described scope. In no case shall the project be assessed an additional cost for scope that is described on the contract documents on bid day. The following division of responsibility is a guideline based on typical industry practice. B. Definitions: 1. "Mechanical Contractors" refers to the Contractors listed in Division 21/22/23 of this Specification. 2. "Technology Contractors" refers to the Contractors furnishing and installing systems listed in Division 27/28 of this Specification. 3. Motor Power Wiring: The single phase or 3 phase wiring extending from the power source (transformer, panelboard, feeder circuits, etc.) through disconnect switches and motor controllers to, and including the connections to the terminals of the motor. 803 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 3 BASIC ELECTRICAL REQUIREMENTS 4. Motor Control Wiring: The wiring associated with the remote operation of the magnetic coils of magnetic motor starters or relays, or the wiring that permits direct cycling of motors by means of devices in series with the motor power wiring. In the latter case, the devices are usually single phase, have "Manual-Off-Auto" provisions, and are usually connected into the motor power wiring through a manual motor starter. 5. Control devices such as start-stop push buttons, thermostats, pressure switches, flow switches, relays, etc., generally represent the types of equipment associated with motor control wiring. 6. Motor control wiring is single phase and usually 120 volts. In some instances, the voltage will be the same as the motor power wiring. When the motor power wiring exceeds 120 volts, a control transformer is usually used to give a control voltage of 120 volts. 7. Temperature Control Wiring: The wiring associated with the operation of a motorized damper, solenoid valve or motorized valve, etc., either modulating or two-position, as opposed to wiring that directly powers or controls a motor used to drive equipment such as fans, pumps, etc. This wiring will be from a 120-volt source and may continue as 120 volt, or be reduced in voltage (24 volt), in which case a control transformer shall be furnished as part of the temperature control wiring. 8. Control Motor: An electric device used to operate dampers, valves, etc. It may be two-position or modulating. Conventional characteristics of such a motor are 24 volts, 60 cycles, 1 phase, although other voltages may be encountered. 9. Low Voltage Technology Wiring: The wiring associated with the technology systems, used for analog or digital signals between equipment. 10. Telecommunications/Technology Rough-in: Relates specifically to the backboxes, necessary plaster rings and other miscellaneous hardware required for the installation or mounting of telecommunications/technology information outlets. C. General: 1. The purpose of these Specifications is to outline the Electrical and Mechanical Contractors' responsibilities related to electrical work required for items such as temperature controls, mechanical equipment, fans, chillers, compressors, etc. The exact wiring requirements for much of the equipment cannot be determined until the systems have been selected and submittals approved. Therefore, the electrical drawings show only known wiring related to such items. All wiring not shown on the electrical drawings, but required for mechanical systems, is the responsibility of the Mechanical Contractor. 2. Where the drawings require the Electrical Contractor to wire between equipment furnished by the Mechanical Contractor, such wiring shall terminate at terminals provided in the equipment. The Mechanical Contractor shall furnish complete wiring diagrams and supervision to the Electrical Contractor and designate the terminal numbers for correct wiring. 3. Control low (24V) and control line (120V) voltage wiring, conduit, and related switches and relays required for the automatic control and/or interlock of motors and equipment, including final connection, are to be furnished and installed under Divisions 21, 22 and 23. Materials and installation to conform to Class 1 or 2 requirements, California Electrical Code Article 725. 804 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 4 BASIC ELECTRICAL REQUIREMENTS 4. The Electrical Contractor shall establish electrical utility elevations prior to fabrication and installation. The Electrical Contractor shall coordinate utility elevations with other trades. When a conflict arises, priority shall be as follows: a. Luminaires. b. Gravity flow piping, including steam and condensate. c. Electrical bus duct. d. Sheet metal. e. Cable trays, including access space. f. Other piping. g. Conduits and wireway. D. Mechanical Contractor's Responsibility: 1. Assumes responsibility for internal wiring of all equipment furnished by the Mechanical Contractor. 2. Assumes all responsibility for miscellaneous items furnished by the Mechanical Contractor that require wiring but are not shown on the electrical drawings or specified in the Electrical Specification. If items such as relays, flow switches, or interlocks are required to make the mechanical system function correctly or are required by the manufacturer, they are the responsibility of the Mechanical Contractor. 3. Assumes all responsibility for Temperature Control wiring, if the Temperature Control Contractor is a Subcontractor to the Mechanical Contractor. 4. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. E. Temperature Control Contractor's or Subcontractor's Responsibility: 1. Wiring of all devices needed to make the Temperature Control System functional. 2. Verifying any control wiring on the electrical drawings as being by the Electrical Contractor. All wiring required for the Control System, but not shown on the electrical drawings, is the responsibility of the Temperature Control Contractor or Subcontractor. 3. Coordinating equipment locations (such as PE's, EP's, relays, transformers, etc.) with the Electrical Contractor, where wiring of the equipment is by the Electrical Contractor. F. Electrical Contractor's Responsibility: 1. Furnishes and installs all combination starters, manual starters and disconnect devices shown on the Electrical Drawings or indicated to be by the Electrical Contractor in the Mechanical Drawings or Specifications. 2. Installs and wires all remote-control devices furnished by the Mechanical Contractor or Temperature Control Contractor when so noted on the Electrical Drawings. 3. Furnishes and installs motor control and temperature control wiring, when noted on the drawings. 805 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 5 BASIC ELECTRICAL REQUIREMENTS 4. Furnishes, installs, and connects all relays, etc., for automatic shutdown of certain mechanical equipment (supply fans, exhaust fans, etc.) upon actuation of the Fire Alarm System. 5. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. G. General (Electrical/Technology): 1. "Electrical Contractor" as referred to herein shall be responsible for scope listed in Division 27/28 of this specification when the "Suggested Matrix of Scope Responsibility" indicated work shall be furnished and installed by the EC. Refer to the Contract Documents for this "Suggested Matrix of Scope Responsibility". 2. The purpose of these Specifications is to outline the Electrical and Technology Contractor's work responsibilities as related to Telecommunications Rough-in, conduit, cable tray, power wiring and Low Voltage Technology Wiring. 3. The exact wiring requirements for much of the equipment cannot be determined until the systems have been purchased and submittals approved. Therefore, only known wiring, conduits, raceways and electrical power related to such items is shown on the Technology drawings. Other wiring, conduits, raceways, junction boxes and electrical power not shown on the Technology Drawings but required for operation of the systems is the responsibility of the Technology Contractor and included in said Contractor's bid. 4.Where the Electrical Contractor is required to install conduit, conduit sleeves and/or power connections in support of Technology systems, the final installation shall not be until a coordination meeting between the Electrical Contractor and the Technology Contractor has convened to determine the exact location and requirements of the installation. 5. Where the Electrical Contractor is required to install cable tray that will contain Low Voltage Technology Wiring, installation shall not begin prior to a coordination review of the cable tray shop drawings by the Technology Contractor. H. Technology Contractor's Responsibility: 1. Assumes all responsibility for the low voltage technology wiring of all systems, including cable support where open cable is specified. 2. Assumes all responsibility for all required backboxes, conduit and power connections not specifically shown as being furnished and installed by the Electrical Contractor on the "Suggested Matrix of Scope Responsibility". 3. Assumes all responsibility for providing and installing all ladder rack and other cable management hardware (as defined herein). 4. Responsible for providing the Electrical Contractor with the required grounding lugs or other hardware for each piece of technology equipment which is required to be bonded to the telecommunications ground bar. 5. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. 806 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 6 BASIC ELECTRICAL REQUIREMENTS 1.6 COORDINATION DRAWINGS A. Definitions: 1. Coordination Drawings: A compilation of the pertinent layout and system drawings that show the sizes and locations, including elevations, of system components and required access areas to ensure that no two objects will occupy the same space. a. Mechanical trades shall include, but are not limited to, mechanical equipment, ductwork, fire protection systems, plumbing piping, medical gas systems, hydronic piping, steam and steam condensate piping, and any item that may impact coordination with other disciplines. b. Electrical trades shall include, but are not limited to, electrical equipment, conduit 1.5" and larger, conduit racks, cable trays, pull boxes, transformers, raceway, busway, lighting, ceiling-mounted devices, and any item that may impact coordination with other disciplines. c. Technology trades shall include, but are not limited to, technology equipment, racks, conduit 1.5" and larger, conduit racks, cable trays, ladder rack, pull boxes, raceway, ceiling-mounted devices, and any item that may impact coordination with other disciplines. d. Maintenance clearances and code-required dedicated space shall be included. e. The coordination drawings shall include all underground, underfloor, in-floor, in chase, and vertical trade items. 2. The contractors shall use the coordination process to identify the proper sequence of installation of all utilities above ceilings and in other congested areas, to ensure an orderly and coordinated end result, and to provide adequate access for service and maintenance. B. Participation: 1. The contractors and subcontractors responsible for work defined above shall participate in the coordination drawing process. 2. One contractor shall be designated as the Coordinating Contractor for purposes of preparing a complete set of composite electronic CAD coordination drawings that include all applicable trades, and for coordinating the activities related to this process. The Coordinating Contractor for this project shall be the Mechanical Contractor. a. The Coordinating Contractor shall utilize personnel familiar with requirements of this project and skilled as draftspersons/CAD operators, competent to prepare the required coordination drawings. 3. Electronic CAD drawings shall be submitted to the City of Moorpark and Coordinating Contractor for addition of work by other trades. IMEG will provide electronic file copies of ventilation drawings for contractor's use if the contractor signs and returns an "Electronic File Transfer" waiver provided by IMEG. IMEG will not consider blatant reproductions of original file copies an acceptable alternative for coordination drawings. 807 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 7 BASIC ELECTRICAL REQUIREMENTS 4. Coordination between trades shall occur prior to Bidding. 5. For Construction, plans shall be submitted to the City prior to Bidding. C. Drawing Requirements: 1. The file format and file naming convention shall be coordinated with and agreed to by all contractors participating in the coordination process and the Owner. a. Scale of drawings: 1) General plans: 1/4 Inch = 1 '-0" (minimum). 2) Mechanical, electrical, communication rooms, and including the surrounding areas within 10 feet: 1/2 Inch = 1'-0" (minimum). 3) Shafts and risers: 1/2 Inch = 1'-0" (minimum). 4) Sections of shafts and mechanical and electrical equipment rooms: 1/4 Inch = 1 '-0" (minimum). 5) Sections of congested areas: 1/2 Inch = 1'-0" (minimum). 2. Ductwork layout drawings shall be the baseline system for other components. Ductwork layout drawings shall be modified to accommodate other components as the coordination process progresses. 3. There may be more drawings required for risers, top and bottom levels of mechanical rooms, and shafts. 4. The minimum quantity of drawings will be established at the first coordination meeting and sent to the A/E for review. Additional drawings may be required if other areas of congestion are discovered during the coordination process. D. General: 1. Coordination and/or Construction drawing files shall be made available to the A/E and City Representative. The A/E will only review identified conflicts and give an opinion, but will not perform as a coordinator. 2. A plotted set of coordination drawings shall be available at the project site. 3. Coordination drawings are not shop drawings and shall not be submitted as such. 4. The contract drawings are schematic in nature and do not show every fitting and appurtenance for each utility. Each contractor is expected to have included in the bid sufficient fittings, material, and labor to allow for adjustments in routing of utilities made necessary by the coordination process and to provide a complete and functional system. 5. The contractors will not be allowed additional costs or time extensions due to participation in the coordination process. 6. The contractors will not be allowed additional costs or time extensions for additional fittings, reroutings or changes of duct size, that are essentially equivalent sizes to those shown on the drawings and determined necessary through the coordination process. 7. The A/E reserves the right to determine space priority of equipment in the event of spatial conflicts or interference between equipment, piping, conduit, ducts, and equipment provided by the trades. 8. Changes to the contract documents that are necessary for systems installation and coordination shall be brought to the attention of the A/E. 808 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 8 BASIC ELECTRICAL REQUIREMENTS 9. Access panels shall preferably occur only in gypsum board walls or plaster ceilings where indicated on the drawings. a. Access to mechanical, electrical, technology, and other items located above the ceiling shall be through accessible lay-in ceiling tile areas. b. Potential layout changes shall be made to avoid additional access panels. c. Additional access panels shall not be allowed without written approval from the A/E at the coordination drawing stage. d. Providing additional access panels shall be considered after other alternatives are reviewed and discarded by the A/E and the Owner's Representative. e. When additional access panels are required, they shall be provided without additional cost to the Owner. 10. Complete the coordination drawing process and obtain sign-off of the drawings by all contractors prior to installing any of the components. 11. Conflicts that result after the coordination drawings are signed off shall be the responsibility of the contractor or subcontractor who did not properly identify their work requirements, or installed their work without proper coordination. 12. Updated coordination drawings that reflect as-built conditions may be used as record documents. 1.7 QUALITY ASSURANCE A. Contractor's Responsibility Prior to Submitting Pricing/Bid Data: 1. The Contractor is responsible for constructing complete and operating systems. The Contractor acknowledges and understands that the Contract Documents are a two- dimensional representation of a three-dimensional object, subject to human interpretation. This representation may include imperfect data, interpreted codes, utility guides, three-dimensional conflicts, and required field coordination items. Such deficiencies can be corrected when identified prior to ordering material and starting installation. The Contractor agrees to carefully study and compare the individual Contract Documents and report at once in writing to the Architect/Engineer any deficiencies the Contractor may discover. The Contractor further agrees to require each subcontractor to likewise study the documents and report at once any deficiencies discovered. 2. The Contractor shall resolve all reported deficiencies with the Architect/Engineer prior to awarding any subcontracts, ordering material, or starting any work with the Contractor's own employees. Any work performed prior to receipt of instructions from the Architect/Engineer will be done at the Contractor's risk. B. Qualifications: 1. Only products of reputable manufacturers as determined by the Architect/Engineer are acceptable. 2. All Contractors and subcontractors shall employ only workmen who are skilled in their trades. At all times, the number of apprentices at the job site shall be less than or equal to the number of journeymen at the job site. 809 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 9 BASIC ELECTRICAL REQUIREMENTS C. Compliance with Codes, Laws, Ordinances: 1. Conform to all requirements of the City of Moorpark Codes, Laws, Ordinances and other regulations having jurisdiction. 2. If there is a discrepancy between the codes and regulations and these specifications, the Architect/Engineer shall determine the method or equipment used. 3. If the Contractor notes, at the time of bidding, that any parts of the drawings or specifications do not comply with the codes or regulations, Contractor shall inform the Architect/Engineer in writing, requesting a clarification. If there is insufficient time for this procedure, Contractor shall submit with the proposal a separate price to make the system comply with the codes and regulations. 4. All changes to the system made after the letting of the contract to comply with codes or the requirements of the Inspector, shall be made by the Contractor without cost to the Owner. 5. If there is a discrepancy between manufacturer's recommendations and these specifications, the manufacturer's recommendations shall govern. 6. If there are no local codes having jurisdiction, the current issue of the National Electrical Code shall be followed. D. Permits, Fees, Taxes, Inspections: 1. Procure all applicable permits and licenses. 2. Abide by all laws, regulations, ordinances, and other rules of the State or Political Subdivision where the work is done, or as required by any duly constituted public authority. 3. Pay all charges for permits or licenses. 4. Pay all fees and taxes imposed by State, Municipal, and other regulatory bodies. 5. Pay all charges arising out of required inspections by an authorized body as applicable, 6. Pay all charges arising out of required contract document reviews associated with the project and as initiated by the Owner or authorized agency/consultant as applicable. 7. Where applicable, all fixtures, equipment and materials shall be listed by Underwriter's Laboratories, Inc. or a nationally recognized testing organization. 8. Pay all telephone company charges related to the service or change in service. E. Examination of Drawings: 1. The drawings for the electrical work are completely diagrammatic, intended to convey the scope of the work and to indicate the general arrangements and locations of equipment, outlets, etc., and the approximate sizes of equipment. 2. Contractor shall determine the exact locations of equipment and rough-ins, and the exact routing of raceways to best fit the layout of the job. Conduit entry points for electrical equipment including, but not limited to, panelboards, switchboards, switchgear, shall be determined by the Contractor unless noted in the contract documents. 3. Scaling of the drawings will not be sufficient or accurate for determining these locations. 810 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 10 BASIC ELECTRICAL REQUIREMENTS 4. Where job conditions require reasonable changes in arrangements and locations, such changes shall be made by the Contractor at no additional cost to the Owner. 5. Because of the scale of the drawings, certain basic items, such as junction boxes, pull boxes, conduit fittings, etc., may not be shown, but where required by other sections of the specifications or required for proper installation of the work, such items shall be furnished and installed. 6. If an item is either shown on the drawings or called for in the specifications, it shall be included in this contract. 7. The Contractor shall determine quantities and quality of material and equipment required from the documents. Where discrepancies arise between drawings, schedules and/or specifications, the greater and better-quality number shall govern. 8. Where used in electrical documents the word "furnish" shall mean supply for use, the word "install" shall mean connect up complete and ready for operation, and the word "provide" shall mean to supply for use and connect up complete and ready for operation. 9. Any item listed as furnished shall also be installed unless otherwise noted. 10. Any item listed as installed shall also be furnished unless otherwise noted. F. Electronic Media/Files: 1. Construction drawings for this project have been prepared utilizing Revit. 2. Contractors and Subcontractors may request electronic media files of the contract drawings and/or copies of the specifications. Specifications will be provided in PDF format. 3. Upon request for electronic media, the Contractor shall complete and return a signed "Electronic File Transmittal" form provided by IMEG. 4. If the information requested includes floor plans prepared by others, the Contractor will be responsible for obtaining approval from the appropriate Design Professional for use of that part of the document. 5. The electronic contract documents can be used for preparation of shop drawings and as-built drawings only. The information may not be used in whole or in part for any other project. 6. The construction drawings prepared by IMEG for bidding purposes may not be used directly for ductwork layout drawings or coordination drawings. 7. The use of these CAD documents by the Contractor does not relieve them from their responsibility for coordination of work with other trades and verification of space available for the installation. 8. Plans and specifications shall be provided to the City once design in complete. G. Field Measurements: 1. Verify all pertinent dimensions at the job site before ordering any conduit, conductors, wireways, bus duct, fittings, etc. 1.8 SUBMITTALS A. Submittals shall be required for the following items, and for additional items where required elsewhere in the specifications or on the drawings. 811 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 11 BASIC ELECTRICAL REQUIREMENTS 1. Submittals list: Referenced Specification Section Submittal Item Coordination Drawing 26 05 03 Through Penetration Firestopping 26 05 13 Wire and Cable 26 05 26 Grounding and Bonding 26 05 33 Conduit and Boxes +> 1.5" 26 05 48 Seismic Requirements for Equipment and Supports 26 05 53 Electrical Identification 26 09 33 Lighting Control System 26 24 16 Panelboards Yes 26 27 16 Cabinets and Enclosures Yes 26 27 26 Wiring Devices Ceiling mount 26 28 13 Fuses 26 28 16 Disconnect Switches Yes 26 32 13 Packaged Engine Generator Systems Yes 26 36 00 Transfer Switch Yes 26 51 19 LED Lighting Yes 28 31 00 Fire Alarm and Detection Systems Yes Drawings Photocells, Timeclocks, Relays B. General Submittal Procedures: In addition to the provisions of Division 1, the following are required: 1. Transmittal: Each transmittal shall include the following: a. Date b. Project title and number c. Contractor's name and address d. Division of work (e.g., electrical, plumbing, heating, ventilating, etc.) e. Description of items submitted and relevant specification number f. Notations of deviations from the contract documents g. Other pertinent data 2. Submittal Cover Sheet: Each submittal shall include a cover sheet containing: a. Date b. Project title and number c. Architect/Engineer d. Contractor and subcontractors' names and addresses e. Supplier and manufacturer's names and addresses f. Division of work (e.g., electrical, plumbing, heating, ventilating, etc.) g. Description of item submitted (using project nomenclature) and relevant specification number h. Notations of deviations from the contract documents 812 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 12 BASIC ELECTRICAL REQUIREMENTS i. Other pertinent data j. Provide space for Contractor's review stamps 3. Composition: a. Submittals shall be submitted using specification sections and the project nomenclature for each item. b. Individual submittal packages shall be prepared for items in each specification section. All items within a single specification section shall be packaged together where possible. An individual submittal may contain items from multiple specifications sections if the items are intimately linked (e.g., pumps and motors). c. All sets shall contain an index of the items enclosed with a general topic description on the cover. 4. Content: Submittals shall include all fabrication, erection, layout, and setting drawings; manufacturers' standard drawings; schedules; descriptive literature, catalogs and brochures; performance and test data; wiring and control diagrams; dimensions; shipping and operating weights; shipping splits; service clearances; and all other drawings and descriptive data of materials of construction as may be required to show that the materials, equipment or systems and the location thereof conform to the requirements of the contract documents. 5. Contractor's Approval Stamp: a. The Contractor shall thoroughly review and approve all shop drawings before submitting them to the Architect/Engineer. The Contractor shall stamp, date and sign each submittal certifying it has been reviewed. b. Unstamped submittals will be rejected. c. The Contractor's review shall include, but not be limited to, verification of the following: 1) Only approved manufacturers are used. 2) Addenda items have been incorporated. 3) Catalog numbers and options match those specified. 4) Performance data matches that specified. 5) Electrical characteristics and loads match those specified. 6) Equipment connection locations, sizes, capacities, etc. have been coordinated with other affected trades. 7) Dimensions and service clearances are suitable for the intended location. 8) Equipment dimensions are coordinated with support steel, housekeeping pads, openings, etc. 9) Constructability issues are resolved (e.g., weights and dimensions are suitable for getting the item into the building and into place, sinks fit into countertops, etc.). d. The Contractor shall review, stamp and approve all subcontractors' submittals as described above. 813 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 13 BASIC ELECTRICAL REQUIREMENTS e. The Contractor's approval stamp is required on all submittals. Approval will indicate the Contractor's review of all material and a complete understanding of exactly what is to be furnished. Contractor shall clearly mark all deviations from the contract documents on all submittals. If deviations are not marked by the Contractor, then the item shall be required to meet all drawing and specification requirements. 6. Submittal Identification and Markings: a. The Contractor shall clearly mark each item with the same nomenclature applied on the drawings or in the specifications. b. The Contractor shall clearly indicate the size, finish, material, etc. c. Where more than one model is shown on a manufacturer's sheet, the Contractor shall clearly indicate exactly which item and which data is intended. d. All marks and identifications on the submittals shall be unambiguous. 7. Schedule submittals to expedite the project. Coordinate submission of related items. 8. Identify variations from the contract documents and product or system limitations that may be detrimental to the successful performance of the completed work. 9. Reproduction of contract documents alone is not acceptable for submittals. 10. Incomplete submittals will be rejected without review. Partial submittals will only be reviewed with prior approval from the Architect/Engineer. 11. Submittals not required by the contract documents may be returned without review. 12. The Architect/Engineer's responsibility shall be to review one set of shop drawing submittals for each product. If the first submittal is incomplete or does not comply with the drawings and/or specifications, the Contractor shall be responsible to bear the cost for the Architect/Engineer to recheck and handle the additional shop drawing submittals. 13. Submittals shall be reviewed and approved by the Architect/Engineer before releasing any equipment for manufacture or shipment. 14. Contractor's responsibility for errors, omissions or deviation from the contract documents in submittals is not relieved by the Architect/Engineer's approval. 15. Schedule shall allow for adequate time to perform orderly and proper review of submittals, including time for consultants and Owner if required, and resubmittals by Contractor if necessary, and to cause no delay in Work or in activities of Owner or other contractors. a. Allow at least two weeks for Architect's/Engineer's review and processing of each submittal. 16. Architect/Engineer reserves the right to withhold action on a submittal which, in the Architect/Engineer's opinion, requires coordination with other submittals until related submittals are received. The Architect/Engineer will notify the Contractor, in writing, when they exercise this right. 814 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 14 BASIC ELECTRICAL REQUIREMENTS C. Electronic Submittal Procedures: 1. Distribution: Email submittals as attachments to all parties designated by the Architect/Engineer, unless a web-based submittal program is used. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. Submittal file name: 26 XX XX.description.YYYYMMDD b. Transmittal file name: 26 XX XX.description.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 1.9 SCHEDULE OF VALUES A. The requirements herein are in addition to the provisions of Division 1. B. Format: 1. Use AIA Document Continuation Sheets G703 or another similar form approved by the Owner and Architect/Engineer. 2. Submit in Excel format. 3. Support values given with substantiating data. C. Preparation: 1. Itemize work required by each specification section and list all providers. All work provided by subcontractors and major suppliers shall be listed on the Schedule of Values. List each subcontractor and supplier by company name. 2. Break down all costs into: a. Material: Delivered cost of product with taxes paid. b. Labor: Labor cost, excluding overhead and profit. 3. Itemize the cost for each of the following: a. Overhead and profit. b. Bonds. c. Insurance. d. General Requirements: Itemize all requirements. 815 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 15 BASIC ELECTRICAL REQUIREMENTS 4. For each line item having an installed cost of more than $5,000, break down costs to list major products or operations under each item. At a minimum, provide material and labor cost line items for the following: a. Each piece of equipment requiring shop drawings. Use the equipment nomenclature (SB-1, PANEL P-1, etc.) on the Schedule of Values. b. Each type of small unitary equipment (e.g., FDS, FCS, CS, etc.). Multiple units of the same type can be listed together provided quantities are also listed so unit costs can be determined. c. Each conduit system (medium voltage, normal, emergency, low voltage systems, etc.). In addition, for larger projects breakdown the material and labor for each conduit system based on geography (building, floor, and/or wing). d. Fire alarm broken down into material and labor for the following: 1) Engineering 2) Controllers, devices, sensors, etc. 3) Conduit 4) Wiring 5) Programming 6) Commissioning e. Site utilities (5' beyond building) f. Seismic design g. Testing h. Commissioning i. Record drawings j. Punchlist and closeout D. Update Schedule of Values when: 1. Indicated by Architect/Engineer. 2. Change of subcontractor or supplier occurs. 3. Change of product or equipment occurs. 1.10 CHANGE ORDERS A. A detailed material and labor takeoff shall be prepared for each change order, along with labor rates and markup percentages. Change orders shall be broken down by sheet or associated individual line item indicated in the change associated narrative, whichever provides the most detailed breakdown. Change orders with inadequate breakdown will be rejected. B. Itemized pricing with unit cost shall be provided from all distributors and associated subcontractors. C. Change order work shall not proceed until authorized. D. In addition to Division 01, General Requirements, front end governs. 816 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 16 BASIC ELECTRICAL REQUIREMENTS 1.11 PRODUCT DELIVERY, STORAGE, HANDLING and MAINTENANCE A. Exercise care in transporting and handling to avoid damage to materials. Store materials on the site to prevent damage. B. Keep all materials clean, dry and free from damaging environments. C. Coordinate the installation of heavy and large equipment with the General Contractor and/or Owner. If the Electrical Contractor does not have prior documented experience in rigging and lifting similar equipment, he/she shall contract with a qualified lifting and rigging service that has similar documented experience. Follow all equipment lifting and support guidelines for handling and moving. D. Contractor is responsible for moving equipment into the building and/or site. Contractor shall review site prior to bid for path locations and any required building modifications to allow movement of equipment. Contractor shall coordinate the work with other trades. 1.12 NETWORK / INTERNET CONNECTED EQUIPMENT A. These specifications may require certain equipment or systems to have network, Internet and/or remote access capability ("Network Capability"). Any requirement for Network Capability shall be interpreted only as a functional capability and is not to be construed as authority to connect or enable any Network Capability. Network Capability may only be connected or enabled with the express written consent of the Owner. 1.13 WARRANTY A. Provide one-year warranty for all fixtures, equipment, materials, and workmanship. B. The warranty period for all work in this specification Division shall commence on the date of Substantial Completion or successful system performance whichever occurs later. The warranty may also commence if a whole or partial system or any separate piece of equipment or component is put into use for the benefit of any party other than the installing contractor with prior written authorization of the Owner. In this instance, the warranty period shall commence on the date when such whole system, partial system or separate piece of equipment or component is placed in operation and accepted in writing by the Owner. C. Warranty requirements extend to correction, without cost to the Owner, of all work found to be defective or nonconforming to the contract documents. The Contractor shall bear the cost of correcting all damage due to defects or nonconformance with contract documents excluding repairs required as a result of improper maintenance or operation, or of normal wear as determined by the Architect/Engineer. 1.14 INSURANCE A. This Contractor shall maintain insurance coverage as set forth in Division 1 of these specifications. 817 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 17 BASIC ELECTRICAL REQUIREMENTS 1.15 MATERIAL SUBSTITUTION A. Where several manufacturers’ names are given, the manufacturer for which a catalog number is given is the basis for job design and establishes the quality. B. Equivalent equipment manufactured by the other listed manufacturers may be used. Contractor shall ensure that all items submitted by these other manufacturers meet all requirements of the drawings and specifications and fits in the allocated space. When using other listed manufacturers, the Contractor shall assume responsibility for any and all modifications necessary (including, but not limited to structural supports, electrical connections and rough-in, and regulatory agency approval, etc.) and coordinate such with other contractors. The Architect/Engineer shall make the final determination of whether a product is equivalent. C. Any material, article or equipment of other unnamed manufacturers which will adequately perform the services and duties imposed by the design and is of a quality equal to or better than the material, article or equipment identified by the drawings and specifications may be used if approval is secured in writing from the Architect/Engineer via addendum. The Contractor assumes all costs incurred as a result of using the offered material, article or equipment, on the Contractors part or on the part of other Contractors whose work is affected. D. Voluntary add or deduct prices for alternate materials may be listed on the bid form. These items will not be used in determining the low bidder. This Contractor assumes all costs incurred as a result of using the offered material or equipment on the Contractors part or on the part of other Contractors whose work is affected. E. All material substitutions requested after the final addendum must be listed as voluntary changes on the bid form. F. In addition to Division 01, General Requirements, front end governs. G. SPECIFIER: LEED REQUIREMENTS briefly explains the LEED goals for the project. LEED is a global checkbox parameter and will be included or deleted with the global checkbox. This definition and list of points should match across divisions. PART 2 - PRODUCTS 2.1 GENERAL A. All items of material having a similar function (e.g., safety switches, panelboards, switchboards,) shall be of the same manufacturer unless specifically stated otherwise on drawings or elsewhere in specifications. 818 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 18 BASIC ELECTRICAL REQUIREMENTS PART 3 - EXECUTION 3.1 JOBSITE SAFETY A. Neither the professional activities of the Architect/Engineer, nor the presence of the Architect/Engineer or the employees and subconsultants at a construction site, shall relieve the Contractor and any other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions of the work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Architect/Engineer and personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The Contractor is solely responsible for jobsite safety. The Architect/Engineer and the Architect/Engineer's consultants shall be indemnified and shall be made additional insureds under the Contractor's general liability insurance policy. 3.2 EXCAVATION, FILL, BACKFILL, COMPACTION A. General: 1. Prior to the commencement of any excavation or digging, the Contractor shall verify all underground utilities with the regional utility locator. Provide prior notice to the locator before excavations. Contact information for most regional utility locaters can be found by calling 811. 2. The Contractor shall do all excavating, filling, backfilling, compacting, and restoration in connection with the work. B. Excavation: 1. Make all excavations to accurate, solid, undisturbed earth, and to proper dimensions. 2. If excavations are carried in error below indicated levels, concrete of same strength as specified for the foundations or thoroughly compacted sand-gravel fill, as determined by the Architect/Engineer shall be placed in such excess excavations under the foundation. Place thoroughly compacted, clean, stable fill in excess excavations under slabs on grade, at the Contractor's expense. 3. Trim bottom and sides of excavations to grades required for foundations. 4. Protect excavations against frost and freezing. 5. Take care in excavating not to damage surrounding structures, equipment or buried pipe. Do not undermine footing or foundation. 6. Perform all trenching in a manner to prevent cave-ins and risk to workmen. 7. Where original surface is pavement or concrete, the surface shall be saw cut to provide clean edges and assist in the surface restoration. 8. If satisfactory bearing soil is not found at the indicated levels, immediately notify the Architect/Engineer or their representative, and do no further work until the Architect/Engineer or their representative gives further instructions. 819 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 19 BASIC ELECTRICAL REQUIREMENTS 9. Excavation shall be performed in all ground conditions, including rock, if encountered. Bidders shall visit the premises and determine the soil conditions by actual observations, borings, or other means. The cost of all such inspections, borings, etc., shall be borne by the bidder. 10. If a trench is excavated in rock, a compacted bed with a depth of 3" (minimum) of sand and gravel shall be used to support the conduit unless masonry cradles or encasements are used. 11. Mechanical excavation of the trench to line and grade of the conduit or to the bottom level of masonry cradles or encasements is permitted, unless otherwise indicated on the electrical drawings. 12. Mechanical excavation of the trench to line and grade where direct burial cables are to be installed is permitted provided the excavation is made to a depth to permit installation of the cable on a fine sand bed at least 3 inches deep. C. Dewatering: 1. Furnish, install, operate and remove all dewatering pumps and pipes needed to keep trenches and pits free of water. D. Underground Obstructions: 1. Known underground piping, conduit, feeders, foundations, and other obstructions in the vicinity of construction are shown on the drawings. Review all Bid Documents for all trades on the project to determine obstructions indicated. Take great care in making installations near underground obstructions. 2. If objects not shown on the drawings are encountered, remove, relocate, or perform extra work as directed by the Architect/Engineer. E. Fill and Backfilling: 1. Utilities Bedding: Lay underground utilities on minimum of 6"sand bedding or. Compact bedding under utilities smooth, with no sharp edges protruding, to protect the utilities from puncture. Shape bedding to provide continuous support for bells, joints, and barrels of utilities and for joints and fittings. 2. Envelope around utilities to 6" above utilities: Place and compact sand or to a height of 6" over utilities in 6" layers. Each layer shall be placed, then carefully and uniformly tamped, to eliminate lateral or vertical displacement. After connection joints are made, any misalignment can be corrected by tamping backfill around the utilities. 3. Backfill from 6" above utilities to earthen grade: Place all backfill materials above the utilities in uniform layers not exceeding 6" deep. Each layer shall be placed, then carefully and uniformly tamped, to eliminate lateral or vertical displacement. 4. Backfill from 6" above utilities to below slabs or paved area: Where the fill and backfill will ultimately be under a building, floor or paving, each layer of backfill materials shall be compacted to 95% of the maximum density determined by AASHTO Designation T 99 or ASTM Designation D 698. Moisture content of soil at time of compaction shall not exceed plus or minus 2% of optimum moisture content determined by AASHTO T 99 or ASTM D 698 test. - 820 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 20 BASIC ELECTRICAL REQUIREMENTS 5. Backfill Materials: Native soil materials may be used as backfill if approved by the Geotechnical Engineer. Backfill material shall be free of rock or gravel larger than 3" in any dimension and shall be free of debris, waste, frozen materials, vegetation, high void content, and other deleterious materials. Water shall not be permitted to rise in unbackfilled trenches. 6. Dispose of excess excavated earth as directed. 7. Backfill all trenches and excavations immediately after installing utilities or removal of forms, unless other protection is provided. 8. Around piers and isolated foundations and structures, backfill and fill shall be placed and consolidated simultaneously on all sides to prevent wedge action and displacement. Fill and backfill materials shall be spread in 6 inch uniform horizontal layers with each layer compacted separately to required density. F. Surface Restoration: 1. Where trenches are cut through existing graded, planted, or landscaped areas, the areas shall be restored to the original condition. Replace all planting removed or damaged to its original condition. A minimum of 6 inches of topsoil shall be applied where disturbed areas are to be seeded or sodded. 2. Concrete or asphalt type pavement, seal coat, rock, gravel or earth surfaces removed or damaged shall be replaced with comparable materials and restored to original condition. 3.3 ARCHITECT/ENGINEER OBSERVATION OF WORK A. The contractor shall provide seven (7) calendar days' notice to the Architect/Engineer prior to: 1. Placing fill over underground and underslab utilities. 2. Covering exterior walls, interior partitions and chases. 3. Installing hard or suspended ceilings and soffits. B. The Architect/Engineer will review the installation and provide a written report noting deficiencies requiring correction. The contractor's schedule shall account for these reviews and show them as line items in the approved schedule. C. Above-Ceiling Final Observation: 1. All work above the ceilings must be complete prior to the Architect/Engineer's review. This includes, but is not limited to: a. All junction boxes are closed and identified in accordance with Section 26 05 53 Electrical Identification. b. Luminaires, including ceiling-mounted exit and emergency lights, are installed and operational. c. Luminaire whips are supported above the ceiling. d. Conduit identification is installed in accordance with Section 26 05 53 Electrical Identification. e. Luminaires are suspended independently of the ceiling system when required by these contract documents. f. All wall penetrations have been sealed. 821 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 21 BASIC ELECTRICAL REQUIREMENTS 2. To prevent the Above-Ceiling Final Observation from occurring too early, the Contractor shall review the status of the work and certify, in writing, that the work is ready for the Above-Ceiling Final Observation. 3. It is understood that if the Architect/Engineer finds the ceilings have been installed prior to this review and prior to seven days elapsing, the Architect/Engineer may not recommend further payments to the contractor until full access has been provided. 3.4 PROJECT CLOSEOUT A. The following paragraphs supplement the requirements of Division 1. B. Final Jobsite Observation: 1. To prevent the Final Jobsite Observation from occurring too early, the Contractor shall review the completion status of the project and certify that the job is ready for the final jobsite observation. 2. Attached to the end of this section is a typical list of items that represent the degree of job completeness expected prior to requesting a review. The Contractor shall sign the attached certification and return it to the Architect/Engineer so that the final observation can be scheduled. 3. It is understood that if the Architect/Engineer finds the job not ready for the final observation and additional trips and observations are required to bring the project to completion, the cost of the additional time and expenses incurred by the Architect/Engineer will be deducted from the Contractor's final payment. 4. Contractor shall notify Architect/Engineer 48 hours prior to installation of ceilings or lay-in ceiling tiles. C. The following must be submitted before Architect/Engineer recommends final payment: 1. Operation and maintenance manuals with copies of approved shop drawings. 2. Record documents including marked-up drawings and specifications. 3. A report documenting the instructions given to the Owner's representatives complete with the number of hours spent in the instruction. The report shall bear the signature of an authorized agent of this Contractor and shall be signed by the Owner's representatives. 4. Provide spare parts, maintenance, and extra materials in quantities specified in individual specification sections. Deliver to project site and submit receipt to Architect/Engineer. 5. Inspection and testing report by the fire alarm system manufacturer. 6. Start-up reports on all equipment requiring a factory installation or start-up. 822 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 22 BASIC ELECTRICAL REQUIREMENTS D. Circuit Directories: 1. Provide custom typed circuit directory for each branch circuit panelboard. Provide updated custom typed circuit directory for each existing branch circuit panelboard with new or revised circuits per the scope of work. Label shall include equipment name or final approved room name, room number, and load type for each circuit (examples: SUMP SP-1 or ROOM 101 RECEPT). Revise directory to reflect circuit changes required to balance phase loads. Printed copies of the bid document panel schedules are not acceptable as circuit directories. 3.5 OPERATION AND MAINTENANCE MANUALS A. General: 1. Provide an electronic copy of the O&M manuals as described below for Architect/Engineer's review and approval. The electronic copy shall be corrected as required to address the Architect/Engineer's comments. Once corrected, electronic copies and paper copies shall be distributed as directed by the Architect/Engineer. 2. Approved O&M manuals shall be completed and in the Owner's possession prior to Owner's acceptance and at least 10 days prior to instruction of operating personnel. B. Electronic Submittal Procedures: 1. Distribution: Email the O&M manual as attachments to all parties designated by the Architect/Engineer. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. O&M file name: O&M.div26.contractor.YYYYMMDD b. Transmittal file name: O&Mtransmittal.div26.contractor.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 6. Provide the Owner with an approved copy of the O&M manual on compact discs (CD), digital video discs (DVD), or flash drives with a permanently affixed label, printed with the title "Operation and Maintenance Instructions", title of the project and subject matter of disc/flash drive when multiple disc/flash drives are required. 7. All text shall be searchable. 823 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 23 BASIC ELECTRICAL REQUIREMENTS 8. Bookmarks shall be used, dividing information first by specification section, then systems, major equipment and finally individual items. All bookmark titles shall include the nomenclature used in the construction documents and shall be an active link to the first page of the section being referenced. C. Operation and Maintenance Instructions shall include: 1. Title Page: Include title page with project title, Architect, Engineer, Contractor, all subcontractors, and major equipment suppliers, with addresses, telephone numbers, website addresses, email addresses and point of contacts. Website URLs and email addresses shall be active links in the electronic submittal. 2. Table of Contents: Include a table of contents describing specification section, systems, major equipment, and individual items. 3. Copies of all final approved shop drawings and submittals. Include Architect's/Engineer's shop drawing review comments. Insert the individual shop drawing directly after the Operation and Maintenance information for the item(s) in the review form. 4. Copies of all factory inspections and/or equipment startup reports. 5. Copies of warranties. 6. Schematic wiring diagrams of the equipment that have been updated for field conditions. Field wiring shall have label numbers to match drawings. 7. Dimensional drawings of equipment. 8. Detailed parts lists with lists of suppliers. 9. Operating procedures for each system. 10. Maintenance schedule and procedures. Include a chart listing maintenance requirements and frequency. 11. Repair procedures for major components. 12. Replacement parts and service material requirements for each system and the frequency of service required. 13. Instruction books, cards, and manuals furnished with the equipment. 14. Include record drawings of the one-line diagrams for each major system. The graphic for each piece of equipment shown on the one-line diagram shall be an active link to its associated Operation & Maintenance data. 15. Copies of all panel schedules in electronic Microsoft Excel spreadsheet (.xlsx) file. Each panelboard shall be a separate tab in the workbook. 3.6 INSTRUCTING THE OWNER'S REPRESENTATIVE A. Adequately instruct the Owner's designated representatives in the maintenance, care, and operation of the complete systems installed under this contract. B. Provide verbal and written instructions to the Owner's representatives by FACTORY PERSONNEL in the care, maintenance, and operation of the equipment and systems. C. Contractor shall make a DVD video recording of instructions to the Owner while explaining the system so additional personnel may view the instructions at a later date. The video recording shall be the property of the Owner. D. The Owner has the option to make a video recording of all instructions. Coordinate schedule of instructions to facilitate this recording. 824 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 24 BASIC ELECTRICAL REQUIREMENTS E. The instructions shall include: 1. Maintenance of equipment. 2. Start-up procedures for all major equipment. 3. Description of emergency system operation. F. Notify the Architect/Engineer of the time and place for the verbal instructions to be given to the Owner's representative so a representative can be present if desired. G. Minimum hours of instruction time for each item and/or system shall be as indicated in each individual specification section. H. Operating Instructions: 1. Contractor is responsible for all instructions to the Owner's representatives for the electrical and specialized systems. 3.7 RECORD DOCUMENTS A. The following paragraphs supplement Division 1 requirements. B. Maintain at the job site a separate and complete set of electrical drawings and specifications with all changes made to the systems clearly and permanently marked in complete detail. C. Mark drawings and specifications to indicate approved substitutions; Change Orders, and actual equipment and materials used. All Change Orders, RFI responses, Clarifications and other supplemental instructions shall be marked on the documents. Record documents that merely reference the existence of the above items are not acceptable. Should this Contractor fail to complete Record Documents as required by this contract, this Contractor shall reimburse Architect/Engineer for all costs to develop record documents that comply with this requirement. Reimbursement shall be made at the Architect/Engineer's hourly rates in effect at the time of work. D. Record changes daily and keep the marked drawings available for the Architect/Engineer's examination at any normal work time. E. Upon completing the job, and before final payment is made, give the marked-up drawings to the Architect/Engineer. F. Record actual routing of conduits exceeding 2 inches. 3.8 PAINTING A. Paint all equipment that is marred or damaged prior to the Owner's acceptance. Paint and color shall match original equipment paint and shall be obtained from the equipment supplier if available. All equipment shall have a finished coat of paint applied unless specifically allowed to be provided with a prime coat only. 825 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 25 BASIC ELECTRICAL REQUIREMENTS B. Equipment in finished areas that will be painted to match the room decor will be painted by others. Should this Contractor install equipment in a finished area after the area has been painted, the Contractor shall have the equipment and all its supports, hangers, etc., painted to match the room decor. Painting shall be performed as described in project specifications. C. Equipment cabinets, casings, covers, metal jackets, etc., located in equipment rooms or concealed spaces, shall be furnished in standard finish, free from scratches, abrasions, chippings, etc. D. Equipment in occupied spaces, or if standard to the unit, shall have a baked primer with baked enamel finish coat free from scratches, abrasions, chipping, etc. If color option is specified or is standard to the unit, verify with the Architect the color preference before ordering. E. Paint all equipment in unfinished areas such as mechanical spaces, and storage rooms. Equipment furnished with a suitable factory finish need not be painted; provided the factory applied finish is not marred or spattered. If so, equipment shall be refinished with the same paint as was factory applied. F. All electrical conduit and equipment, fittings, hangers, structural supports, etc., in unfinished areas, such as equipment and storage room area, shall be painted two (2) coats of oil paint of colors selected by the Architect. G. Do NOT paint electric conduits inspaces above suspended ceilings except that where conduit is in a damp location give exposed threads at joints two coats of sealer after joint is made up. H. After surfaces have been thoroughly cleaned and are free of oil, dirt or other foreign matter, paint all raceway and equipment with the following: 1. Bare Metal Surfaces - Apply one coat of metal primer suitable for the metal being painted. Finish with two coats of Alkyd base enamel paint. 2. Plastic Surfaces - Paint plastic surfaces with two coats of semi-gloss acrylic latex paint. 3.9 ADJUST AND CLEAN A. Thoroughly clean all equipment and systems prior to the Owner's final acceptance of the project. B. Clean all foreign paint, grease, oil, dirt, labels, stickers, etc. from all equipment. C. Remove all rubbish, debris, etc., accumulated during construction from the premises. 3.10 SPECIAL REQUIREMENTS A. Coordinate the installation of all equipment, controls, devices, etc., with other trades to maintain clear access area for servicing. 826 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 26 BASIC ELECTRICAL REQUIREMENTS B. Install all equipment to maximize access to parts needing service or maintenance. Review the final location, placement, and orientation of equipment with the Owner's representative prior to setting equipment. C. Installation of equipment or devices without regard to coordination of access requirements and confirmation with the Owner's representative will result in removal and reinstallation of the equipment at the Contractor's expense. D. Raceway and Cable Routing Restrictions: Raceways and cable are restricted from being routed in the following locations, unless serving the space or permitted by the authority having jurisdiction. 1. Elevator machine rooms and hoistways. 2. Exit enclosures. 3. Other areas restricted by code. 4. Technology, data, server rooms. 5. Fire pump and sprinkler rooms. 6. Normal power in emergency power equipment rooms: Limited to feeders and branch circuits serving the emergency power equipment located in the room. 7. Emergency power in normal power equipment rooms: Limited to feeders and branch circuits serving the normal power equipment located in the room. E. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 3.11 SYSTEM STARTING AND ADJUSTING A. The electrical systems shall be complete and operating. System startup, testing, adjusting, and balancing to obtain satisfactory system performance is the responsibility of the Contractor. This includes all calibration and adjustment of electrical controls, balancing of loads, troubleshooting and verification of software, and final adjustments that may be needed. B. Complete all manufacturer-recommended startup procedures and checklists to verify proper equipment operation and does not pose a danger to personnel or property. C. All operating conditions and control sequences shall be tested during the start-up period. Testing all interlocks, safety shut-downs, controls, and alarms. 827 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 27 BASIC ELECTRICAL REQUIREMENTS D. The Contractor, subcontractors, and equipment suppliers shall have skilled technicians to ensure that all systems perform properly. If the Architect/Engineer is requested to visit the job site for trouble shooting, assisting in start-up, obtaining satisfactory equipment operation, resolving installation and/or workmanship problems, equipment substitution issues or unsatisfactory system performance, including call backs during the warranty period, through no fault of the design; the Contractor shall reimburse the Owner on a time and materials basis for services rendered at the Architect/Engineer's standard hourly rates in effect when the services are requested. The Contractor shall pay the Owner for services required that are product, installation or workmanship related. Payment is due within 30 days after services are rendered. 3.12 FIELD QUALITY CONTROL A. General: 1. Conduct all tests required during and after construction. Submit test results in NETA format, or equivalent form, that shows the test equipment used, calibration date, tester's name, ambient test conditions, humidity, conductor length, and results corrected to 40°C. 2. Supply necessary instruments, meters, etc., for the tests. Supply competent technicians with training in the proper testing techniques. 3. All cables and wires shall be tested for shorts and grounds following installation and connection to devices. Replace shorted or grounded wires and cables. 4. Any wiring device, electrical apparatus or luminaire, if grounded or shorted on any integral "live" part, shall have all defective parts or materials replaced. 5. Test cable insulation of service and panel feeder conductors for proper insulation values. Tests shall include the cable, all splices, and all terminations. Each conductor shall be tested and shall test free of short circuits and grounds and have an insulation value not less than Electrical Code Standards. Take readings between conductors, and between conductors and ground. 6. If the results obtained in the tests are not satisfactory, make adjustments, replacements, and changes as needed. Then repeat the tests, and make additional tests, as the Architect/Engineer or authority having jurisdiction deems necessary. B. Ground Resistance: 1. Conduct service ground resistance tests using an approved manufactured ground resistance meter. Submit to the Architect/Engineer a proposed test procedure including type of equipment to be used. (The conventional ohmmeter is not an acceptable device.) 2. Make ground resistance measurements during normal dry weather and not less than 48 hours after a rain. Ground resistance values shall be verified by the Architect/Engineer at the time the readings are taken. 3. If the ground resistance value obtained is more than the value set forth in Section 26 05 26, the following shall be done to obtain the value given: a. Verify that all connections in the service ground system are secure. b. Increase the depth to which ground rods are driven by adding section lengths to the rods and retest. If the resistance is still excessive increase the depth by adding an additional rod section and retest. 828 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 28 BASIC ELECTRICAL REQUIREMENTS c. If the resistance is still excessive, furnish and install additional ground rods, spaced not less than 20 feet from other ground rods unless otherwise noted on plans, and connect into the ground electrode system. Retest. d. Review results with the Architect/Engineer. 4. Before final payment is made to the Contractor submit a written report to the Architect/Engineer including the following: a. Date of test. b. Number of hours since the last rain. c. Soil condition at the time of the test in the ground electrode location. That is: dry, wet, moist, sand, clay, etc. d. Diagram of the test set-up showing distances between test equipment, ground electrode, auxiliary electrodes, etc. e. Make, model, and calibration date of test equipment. f. Tabulation of measurements taken and calculations made. C. Ground-Fault Equipment Performance Testing: 1. Test: Perform ground-fault performance testing when system is installed. The test process shall use primary current injection per manufacturer instruction and procedures. Perform test for the following: a. Service disconnects b. Solid state molded case circuit breakers and solid-state insulated case circuit breakers equipped with ground fault protection. c. Fusible switches with ground fault relay protection. d. Outside branch circuits and feeders. e. Code required. 2. Report: Provide copy of test result report with Operation and Maintenance manuals. Provide report to Authority Having Jurisdiction when requested. D. Arc Energy Reduction Equipment Performance Testing: 1. Test: Perform arc energy protection performance testing when system is installed. The test process shall use primary current injection or approved method per manufacturer instructions and procedures. Perform test for the following: a. All arc energy reduction systems installed. 2. Report: Provide copy of test result report with Operation and Maintenance manuals. Provide report to Authority Having Jurisdiction when requested. 829 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 29 BASIC ELECTRICAL REQUIREMENTS E. Other Equipment: 1. Give other equipment furnished and installed by the Contractor all standard tests normally made to assure that the equipment is electrically sound, all connections properly made, phase rotation correct, fuses and thermal elements suitable for protection against overloads, voltage complies with equipment nameplate rating, and full load amperes are within equipment rating. F. If any test results are not satisfactory, make adjustments, replacements and changes as needed and repeat the tests and make additional tests as the Architect/Engineer or authority having jurisdiction deem necessary. G. Contractor shall thermographic study all electrical gear, switchboard, panelboards, etc. at the end of construction to identify any unusual conditions/heating within the equipment. Coordinate with Owner/Architect/Engineer to have an Owner/Architect/Engineer representative present during testing. H. Report shall include color printouts, in binder, of pictures taken to use as a baseline reading after building is occupied. I. Upon completion of the project, the Contractor shall provide amperage readings for all panelboards and switchboards and turn the results over to the Owner for "benchmark" amperages. 3.13 UTILITY REBATE A. Submit utility rebate forms, where offered at project location, with rebate items completed. Rebate may include lighting, lighting controls, variable speed drives, heat pumps, package terminal A/C, air conditioners, chillers, water heaters, programmable thermostats, and motors. B. Contractor must submit notification of any value engineering or product substitution that will affect the utility rebate amount prior to approval. 830 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 00 - 30 BASIC ELECTRICAL REQUIREMENTS READINESS CERTIFICATION PRIOR TO FINAL JOBSITE OBSERVATION To prevent the final job observation from occurring too early, we require that the Contractor review the completion status of the project and, by copy of this document, certify that the job is indeed ready for the final job observation. The following is a typical list of items that represent the degree of job completeness expected prior to your requesting a final job observation. 1. Penetrations of fire-rated construction fire sealed in accordance with specifications. 2. Electrical panels have typed circuit identification. 3. Smoke and fire/smoke dampers are wired and have been tested. 4. Per Section 26 05 00, cable insulation test results have been submitted. 6. Per Section 26 05 00, ground resistance test results have been submitted. 7. Operation and Maintenance manuals have been submitted as per Section 26 05 00. 8. Bound copies of approved shop drawings have been submitted as per Section 26 05 00. 9. Report of instruction of Owner's representative has been submitted as per Section 26 05 00. 10. Fire alarm inspection and testing report has been submitted as per Sections 26 05 00 and 28 31 00. 11. Start-up reports from factory representative have been submitted as per Section 26 05 00. Accepted by: Prime Contractor _______________________________________________ By ___________________________________ Date ___________________ Upon Contractor certification that the project is complete and ready for a final job observation, we require the Contractor to sign this agreement and return it to the Architect/Engineer so that the final observation can be scheduled. It is understood that if the Architect/Engineer finds the job not ready for the final observation and that additional trips and observations are required to bring the project to completion, the costs incurred by the Architect/Engineers for additional time and expenses will be deducted from the Contractor's contract retainage prior to final payment at the completion of the job. END OF SECTION 26 05 00 831 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 03 - 1 THROUGH PENETRATION FIRESTOPPING SECTION 26 05 03 THROUGH PENETRATION FIRESTOPPING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Through-Penetration Firestopping. 1.2 QUALITY ASSURANCE A. Manufacturer: Company specializing in manufacturing products specified in this Section. B. Installer: Individuals performing work shall be certified by the manufacturer of the system selected for installation. 1.3 REFERENCES A. UL 263 - Fire Tests of Building Construction and Materials B. UL 723 - Surface Burning Characteristics of Building Materials C. ANSI/UL 1479 - Fire Tests of Through Penetration Firestops D. UL 2079 - Tests for Fire Resistance of Building Joint Systems E. UL Fire Resistance Directory Through Penetration Firestop Systems (XHEZ) F. Intertek / Warnock Hersey - Directory of Listed Products G. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials H. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops I. The Building Officials and Code Administrators National Building Code J. 2018 International Building Code K. NFPA 5000 - Building Construction Safety Code L. CBC California Building Code 1.4 SUBMITTALS A. Submit under provisions of Section 26 05 00. B. Submit Firestopping Installers Certification for all installers on the project. 832 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 03 - 2 THROUGH PENETRATION FIRESTOPPING C. Shop Drawings: Submit for each condition requiring firestopping. Include descriptions of the specific penetrating item, actual wall/floor construction, manufacturer's installation instructions, and UL or Interek / Warnock Hersey Assembly number. D. Through-Penetration Firestop System Schedule: Indicate locations of each through- penetration firestop system, along with the following information: 1. Types of penetrating items. 2. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated. 3. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency. 4. F ratings for each firestop system. E. Maintain a notebook on the job site at all times that contains copies of approved submittals for all through penetration firestopping to be installed. Notebook shall be made available to the Authority Having Jurisdiction at their request and turned over to the Owner at the end of construction as part of the O&M Manuals. F. Submit VOC rating of firestopping material in g/L (less water) with documentation that it meets the limits set forth in SCAQMD Rule 1168. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store, protect and handle products on site. Accept material on site in factory containers and packing. Inspect for damage. Protect from deterioration or damage due to moisture, temperature changes, contaminants, or other causes. Follow manufacturer's instructions for storage. B. Install material prior to expiration of product shelf life. 1.6 PERFORMANCE REQUIREMENTS A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. 1. Fire-resistance-rated walls including fire partitions, fire barriers, and smoke barriers. 2. Fire-resistance-rated horizontal assemblies including floors, floor/ceiling assemblies, and ceiling membranes of roof/ceiling assemblies. B. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per UL 1479: 1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated. 833 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 03 - 3 THROUGH PENETRATION FIRESTOPPING C. For through-penetration firestop systems exposed to light, traffic, moisture, or physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. D. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84. E. For through-penetration firestop systems in air plenums, provide products with flame- spread and smoke-developed indexes of less than 25 and 50, respectively, as determined per ASTM E 84. F. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 1.7 MEETINGS A. Pre-installation meeting: A pre-installation meeting shall be scheduled and shall include the Construction Manager, General Contractor, all Subcontractors associated with the installation of systems penetrating fire barriers, Firestopping Manufacturer's Representative, and the Owner. 1. Review foreseeable methods related to firestopping work. 2. Tour representative areas where firestopping is to be installed; inspect and discuss each type of condition and each type of substrate that will be encountered, and preparation to be performed by other trades. 1.8 WARRANTY A. Provide one year warranty on parts and labor. B. Warranty shall cover repair or replacement of firestop systems which fail in joint adhesion, cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, general durability, or appear to deteriorate in any manner not clearly specified by the manufacturer as an inherent quality of the material. 834 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 03 - 4 THROUGH PENETRATION FIRESTOPPING PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Products: Subject to compliance with requirements, provide one of the through- penetration firestop systems indicated for each application that are produced by one of the following manufacturers. All firestopping systems installed shall be provided by a single manufacturer. 1. 3M; Fire Protection Products Division 2. Hilti, Inc. 3. RectorSeal Corporation, Metacaulk 4. Tremco; Sealant/Weatherproofing Division 5. Johns-Manville 6. Specified Technologies Inc. (S.T.I.) 7. Spec Seal Firestop Products 8. AD Firebarrier Protection Systems 9. Wiremold/Legrand: FlameStopper 10. Dow Corning Corp 11. Fire Trak Corp 12. International Protective Coating Corp 2.2 THROUGH PENETRATION FIRESTOP SYSTEMS A. Provide materials and systems classified by or listed by Intertek / Warnock Hersey to provide firestopping equal to time rating of construction being penetrated. B. All firestopping materials shall be free of asbestos, lead, PCB's, and other materials that would require hazardous waste removal. C. Firestopping shall be flexible to allow for normal penetrating item movement due to expansion and contraction. D. Provide firestopping systems capable of supporting floor loads where systems are exposed to possible floor loading or traffic. E. Provide firestopping systems allowing continuous insulation for all insulated pipes. F. Provide firestopping systems classified by UL or listed by Intertek / Warnock Hersey for penetrations through all fire rated construction. Firestopping systems shall be selected from the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory Category XHEZ based on substrate construction and penetrating item size and material and shall fall within the range of numbers listed: 1. Combustible Framed Floors and Chase Walls - 1 or 2 Hour Rated: a. F Rating = Floor/Wall Rating Penetrating Item UL System No. No Penetrating Item FC 0000-0999* Metallic Pipe or Conduit FC 1000-1999 Non-Metallic Pipe or Conduit FC 2000-2999 835 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 03 - 5 THROUGH PENETRATION FIRESTOPPING Penetrating Item UL System No. Electrical Cables FC 3000-3999 Cable Trays FC 4000-4999 Insulated Pipes FC 5000-5999 Bus Duct and Misc. Electrical FC 6000-6999 Duct without Damper and Misc. Mechanical FC 7000-7999 Multiple Penetrations FC 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. 2. Non-Combustible Framed Walls - 1 or 2 Hour Rated: a. F Rating = Wall Rating Penetrating Item UL System No. No Penetrating Item WL 0000-0999* Metallic Pipe or Conduit WL 1000-1999 Non-Metallic Pipe or Conduit WL 2000-2999 Electrical Cables WL 3000-3999 Cable Trays WL 4000-4999 Insulated Pipes WL 5000-5999 Bus Duct and Misc. Electrical WL 6000-6999 Duct without Damper and Misc. Mechanical WL 7000-7999 Multiple Penetrations WL 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. G. Any opening in walls or floors not covered by the listed series of numbers shall be coordinated with the firestopping manufacturer. H. Any openings in floors or walls not described in the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory, or outlined in manufacturer's information shall be sealed in a manner agreed upon by the Firestopping Manufacturer, Owner, and the Authority Having Jurisdiction. PART 3 - EXECUTION 3.1 EXAMINATION A. Ensure all surfaces that contact seal materials are free of dirt, dust, grease, oil, rust, or loose materials. Clean and repair surfaces as required. Remove laitance and form- release agents from concrete. B. Ensure substrate and penetrating items have been permanently installed prior to installing firestopping systems. Ensure penetrating items have been properly spaced and have proper clearance prior to installing firestopping systems. 836 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 03 - 6 THROUGH PENETRATION FIRESTOPPING C. Surfaces to which sealing materials are to be installed must meet the selected UL or Intertek / Warnock Hersey system substrate criteria. D. Prime substrates where recommended in writing by through-penetration firestop system manufacturer. Confine primer to area of bond. 3.2 INSTALLATION A. In existing construction, provide firestopping of openings prior to and after installation of penetrating items. Remove any existing coatings on surfaces prior to firestopping installation. Temporary firestopping shall consist of packing openings with fire resistant mineral wool for the full thickness of substrate, or an alternate method approved by the Authority Having Jurisdiction. All openings shall be temporarily firestopped immediately upon their installation and shall remain so until the permanent UL or listed by Intertek / Warnock Hersey listed firestopping system is installed. B. Install penetration seal materials in accordance with printed instructions of the UL or Intertek / Warnock Hersey Fire Resistance Directory and with the manufacturer's printed application instructions. C. Install dams as required to properly contain firestopping materials within openings and as required to achieve required fire resistance rating. Remove combustible damming after appropriate curing. 3.3 CLEANING AND PROTECTING A. Clean excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not cause damage. B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements. 3.4 IDENTIFICATION A. Provide and install labels adjacent to each firestopping location. Label shall be provided by the firestop system supplier and contain the following information in a contrasting color: 1. The words "Warning - Through Penetration Firestop System - Do Not Disturb. Notify Building Management of Any Damage." 2. Firestop System Supplier; UL or listed by Intertek / Warnock Hersey system number; date installed; contractor name and phone number; manufacturer's representative name, address, and phone number. 837 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 03 - 7 THROUGH PENETRATION FIRESTOPPING 3.5 INSPECTION A. All penetrations shall be inspected by the manufacturer's representative to ensure proper installation. B. Access to firestop systems shall be maintained for examination by the Authority Having Jurisdiction at their request. C. Proceed with enclosing through-penetration firestop system with other construction only after inspection reports are issued and firestop installations comply with requirements. D. The contractor shall allow for visual destructive review of 5% of installed firestop systems (minimum of one) to prove compliance with specifications and manufacturer's instructions and details. Destructive system removal shall be performed by the contractor and witnessed by the Architect/Engineer and manufacturer's factory representative. The Architect/Engineer shall have sole discretion of which firestop system installations will be reviewed. The contractor is responsible for all costs associated with this requirement including labor and material for removing and replacing the installed firestop system. If any firestop system is found to not be installed per manufacturer's specific instructions and details, all firestop systems are subject to destructive review and replacement at the Architect/Engineer's discretion and the contractor's expense. END OF SECTION 26 05 03 838 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 05 - 1 ELECTRICAL DEMOLITION FOR REMODELING SECTION 26 05 05 ELECTRICAL DEMOLITION FOR REMODELING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Electrical demolition PART 2 - PRODUCTS 2.1 MATERIALS AND EQUIPMENT A. Materials and equipment for patching and extending work shall be as specified in individual Sections. PART 3 - EXECUTION 3.1 EXAMINATION A. THE DRAWINGS ARE INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. B. |Where walls, ceilings, structures, etc., are indicated as being removed on general or electrical drawings, the Contractor shall be responsible for the removal of all electrical equipment, devices, fixtures, raceways, wiring, systems, etc., from the removed area. C. Where ceilings, walls, structures, etc., are temporarily removed and replaced by others, this Contractor shall be responsible for the removal, storage, and replacement of equipment, devices, fixtures, raceways, wiring, systems, etc. D. Where mechanical or technology equipment is indicated as being removed on electrical, mechanical, or technology drawings, the Contractor shall be responsible for disconnecting the equipment and removing all starters, VFD, controllers, electrical equipment, raceways, wiring, etc. associated with the device. E. Verify that abandoned wiring and equipment serve only abandoned equipment or facilities. Extend conduit and wire to facilities and equipment that will remain in operation following demolition. Extension of conduit and wire to equipment shall be compatible with the surrounding area. Extended conduit and conductors to match existing size and material. F. Coordinate scope of work with all other Contractors and the Owner at the project site. Schedule removal of equipment and electrical service to avoid conflicts. 839 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 05 - 2 ELECTRICAL DEMOLITION FOR REMODELING 3.2 PREPARATION A. The Contractor shall obtain approval from the Owner before turning off power to circuits, feeders, panels, etc. Coordinate all outages with Owner. B. Coordinate utility service outages with Utility Company. C. Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations. Assume all equipment and systems must remain operational unless specifically noted otherwise on drawings. D. Disconnect electrical systems in walls, floors, structures, and ceilings scheduled for removal. 3.3 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK A. Demolish and extend existing electrical work under provisions of Division 1 of Specifications and this Section. B. Remove, relocate, and extend existing installations to accommodate new construction. C. Remove exposed abandoned raceway, including abandoned raceway above accessible ceiling finishes. Cut raceway flush with walls and floors, and patch surfaces. Remove all associated clamps, hangers, supports, etc. associated with raceway removal. D. Disconnect and remove outlets and devices that are to be demolished. Remove outlet or devices' associated back box, supports, and conduit and conductors back to source. Patch opening created from removal of device to match surrounding finishes. E. Disconnect and remove abandoned panelboards and distribution equipment. F. Disconnect and remove electrical devices and equipment serving utilization equipment that has been removed. G. Disconnect and remove abandoned luminaires. Remove brackets, stems, hangers, and other accessories. Ballasts in light fixtures installed prior to 1980 shall be incinerated in EPA approved incinerator or disposed of in EPA certified containers and deposited in an EPA landfill certified for PCB disposal or recycled by permitted ballast recycler. Punctured or leaking ballasts must be disposed of according to Federal Regulations under the Toxic Substance Control Act. Provide Owner and Architect/Engineer with a Certificate of Destruction to verify proper disposal. H. Repair adjacent construction and finishes damaged during demolition and extension work. Patch openings to match existing surrounding finishes. I. Maintain access to existing electrical installations that remain active. Modify installation or provide junction boxes and access panel as appropriate. 840 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 05 - 3 ELECTRICAL DEMOLITION FOR REMODELING J. Extend existing installations using materials and methods compatible with existing electrical installations, or as specified. Extended conduit and conductors to match existing size and material. K. HID and fluorescent lamps, determined by the Toxicity Characteristic Leachate procedure (TCLP), to be hazardous waste shall be disposed of in an EPA-permitted hazardous waste disposal facility or by a permitted lamp recycler. L. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. M. Floor slabs may contain conduit systems. This Contractor is responsible for taking any measures required to ensure no conduits or other services are damaged. This includes x-ray or similar non-destructive means. Where conduit is in concrete slab, cut conduit flush with floor, pull out conductors, and plug conduit ends. N. This Contractor is responsible for all costs incurred in repair, relocations, or replacement of any cables, conduits, or other services if damaged without proper investigation. 3.4 CLEANING AND REPAIR A. Clean and repair existing materials and equipment that remain or are to be reused. B. Panelboards: Clean exposed surfaces and check tightness of electrical connections. Replace damaged circuit breakers and provide closure plates for vacant positions. Provide typed circuit directory showing revised circuiting arrangement. C. ELECTRICAL ITEMS (E.G., LIGHTING FIXTURES, RECEPTACLES, SWITCHES, CONDUIT, WIRE, ETC.) REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF THE OWNER. CONTRACTOR SHALL PLACE ITEMS RETAINED BY THE OWNER IN A LOCATION COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT. 3.5 INSTALLATION A. Install relocated materials and equipment under the provisions of Division 1 of Specifications. END OF SECTION 26 05 05 - 841 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 13 - 1 WIRE AND CABLE SECTION 26 05 13 WIRE AND CABLE PART 1 - GENERAL 1.1 RELATED WORK A. Section 26 05 53 - Electrical Identification: Refer to electrical identification for color and identification labeling requirements. 1.2 REFERENCES A. NFPA 70 - National Electrical Code (NEC) B. CEC California Electrical Code C. UL 44 - Thermoset-Insulated Wires and Cables D. UL 83 - Thermoplastic-Insulated Wires and Cables E. UL 854 - Service-Entrance Cables F. UL 1581 - Standard for Electrical Wires, Cables, and Flexible Cords G. UL 2196 - Fire Resistive, Fire Resistant and Circuit Integrity Cables PART 2 - PRODUCTS 2.1 BUILDING WIRE A. Feeders and Branch Circuits 8 AWG and larger: Copper, stranded conductor, 600-volt insulation, THHN/THWN or XHHW-2. B. Feeders and Branch Circuits 8 AWG and larger in Underground Conduit: Copper, stranded conductor, 600-volt insulation, THWN or XHHW-2. C. Feeders and Branch Circuits 10 AWG and Smaller: Copper, solid or stranded conductor, 600-volt insulation, THHN/THWN, unless otherwise noted on the drawings. Aluminum conductor is not acceptable. D. Control Circuits: Copper, stranded conductor 600-volt insulation, THHN/THWN. E. Each 120 and 277-volt branch circuit shall have a dedicated neutral conductor. Neutral conductors shall be considered current-carrying conductors for wire derating. 842 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 13 - 2 WIRE AND CABLE PART 3 - EXECUTION 3.1 WIRE AND CABLE INSTALLATION SCHEDULE A. Above Accessible Ceilings: 1. Building wire shall be installed in raceway. 2. Metal clad cable, Type MC, 1/2" size with minimum #12 conductors and ground, shall be allowed for flexible whips to individual luminaires on non-essential circuits. The flexible whips shall be between 18" to 72" in length per Electrical Code. B. All Other Locations: Building wire in raceway. C. Above Grade: All conductors installed above grade shall be type "THHN". D. Underground or In Slab: All conductors shall be type "THWN". E. Low Voltage Cable (less than 100 volts): Low voltage cables in ducts, plenums, and other air handling spaces shall be plenum listed. Low voltage cables in non-accessible areas shall be installed in conduit. Low voltage cable may be installed without conduit in accessible areas using the following types of cable supports. Cable support types/systems shall comply with the warranty requirements of the low voltage cable manufacturer. 1. J-hooks 2. Bridle rings with saddle supports F. Low Voltage Cable (less than 100 volts): Low voltage cable shall be installed in raceway. G. Fire-Rated 2-Hour Feeders and Circuit Requiring Continuous Operation (CI): Refer to Part 2 of this section for acceptable products and assemblies. Installation shall meet UL 2196. 3.2 CONTRACTOR CHANGES A. The basis of design is copper conductors installed in raceway based on ambient temperature of 30°C, CEC California Electrical Code edition Table 310.15(B)(16). Service entrance conductors are based on copper conductor installed in underground electrical ducts, CEC California Electrical Code Table B310.15(B)(2)(7). B. The Contractor shall be responsible for derating and sizing conductors and conduits to equal or exceed the ampacity of the basis of design circuits, if he/she chooses to use methods or materials other than the basis of design. C. Underground electrical duct ampacity rating shall be in accordance with CEC California Electrical Code Table B310.15(B)(2)(7). The calculations and a sketch of the proposed installation shall be submitted prior to any conduit being installed. 843 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 13 - 3 WIRE AND CABLE D. Conductor length(s) listed on plans and schedules. The drawings are diagrammatic with intent to convey the components of the electrical distribution system. Conductor length(s) when listed on plans and schedules are for engineering calculation purposes. Conductor length(s) shall NOT be used for bidding purposes. E. Record drawing shall include the calculations and sketches. 3.3 GENERAL WIRING METHODS A. Use no wire smaller than 12 AWG for power and lighting circuits, and no smaller than 14 AWG for control wiring. B. Use no wire smaller than 18 AWG for low voltage control wiring below 100 volts. C. Use 10 AWG conductor for 20 ampere, 120-volt branch circuit home runs longer than 75 feet, and for 20 ampere, 277-volt branch circuit home runs longer than 200 feet. D. Use no wire smaller than 8 AWG for outdoor lighting circuits. E. The ampacity of multiple conductors in one conduit shall be derated per the Electrical Code. In no case shall more than 4 conductors be installed in one conduit to such loads as motors larger than 1/4 HP, panelboards, motor control centers, etc. F. Where installing parallel feeders, place an equal number of conductors for each phase of a circuit in same raceway or cable. G. Splice only in junction or outlet boxes. H. Neatly train and lace wiring inside boxes, equipment, and panelboards. I. Make conductor lengths for parallel circuits equal. J. All conductors shall be continuous in conduit from last outlet to their termination. K. Terminate all spare conductors on terminal blocks, and label the spare conductors. L. Cables or wires shall not be laid out on the ground before pulling. M. Cables or wires shall not be dragged over earth or paving. N. Care shall be taken so as not to subject the cable or wire to high mechanical stresses that would cause damage to the wire and cable. O. At least six (6)-inch loops or ends shall be left at each outlet for installation connection of luminaires or other devices. P. All wires in outlet boxes not connected to fixtures or other devices shall be rolled up, spliced if continuity of circuit is required, and insulated. 844 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 13 - 4 WIRE AND CABLE 3.4 WIRING INSTALLATION IN RACEWAYS A. Pull all conductors into a raceway at the same time. Use UL listed wire pulling lubricant for pulling 4 AWG and larger wires. Do not use wire pulling lubricant for isolated (ungrounded) power system wiring. B. Install wire in raceway after interior of building has been physically protected from the weather and all mechanical work likely to injure conductors has been completed. C. Pulling shall be continuous without unnecessary stops and starts with wire or cable only partially through raceway. D. Where reels of cable or wire are used, they shall be set up on jacks close to the point where the wire or cable enters the conduit or duct so that the cable or wire may be unreeled and run into the conduit or duct with a minimum of change in the direction of the bend. E. Conductors shall not be pulled through conduits until plastering or masonry work is completed and conduits are free from moisture. Care shall be taken so that long pulls of wire or pulls around several bends are not made where the wire may be permanently stretched and the insulation damaged. F. Only nylon rope shall be permitted to pull cables into conduit and ducts. G. Completely and thoroughly swab raceway system before installing conductors. H. Conductor Supports in Vertical Raceways: 1. Support conductors in vertical raceways in accordance with the Electrical Code Spacing of Conductors Supports. 2. Supports shall be of insulated wedge type (OZ Gedney Type S, or equal) and installed in a tapered insulated bushing fitting or a metal woven mesh with a support ring that fits inside conduit fitting installed in an accessible junction box (Hubbell Kellems support grip or equal). 3.5 CABLE INSTALLATION A. Provide protection for exposed cables where subject to damage. B. Use suitable cable fittings and connectors. C. Run all open cable parallel or perpendicular to walls, ceilings, and exposed structural members. Follow the routing as illustrated on the drawings as closely as possible. Cable routing on drawings scaled 1/4"=1'-0" or less shall be considered diagrammatical, unless noted otherwise. The correct routing, when shown diagrammatically, shall be chosen by the Contractor based on information in the contract documents; in accordance with the manufacturer's written instructions, applicable codes, the NECA's "Standard of Installation", recognized industry standards; and coordinated with other contractors. 845 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 13 - 5 WIRE AND CABLE D. Open cable shall be supported by the appropriate size J-hooks or other means if called for on the drawings. Wire and cable from different systems shall not be installed in the same J-hook. J-hooks shall be sized with 20% spare capacity. J-hooks shall provide proper bend radius support for data cable and fiber cables. E. Open cable installed above suspended ceilings shall not rest on the suspended ceiling construction, nor utilize the ceiling support system for wire and cable support. F. J-hook support spans shall be based on the smaller of the manufacturer's load ratings and code requirements. In no case shall horizontal spans exceed 5 feet and vertical spans exceed 4 feet. All J-hooks shall be installed where completely accessible and not blocked by piping, ductwork, inaccessible ceilings, etc. J-hooks shall be independently rigidly attached to a structural element. J-hooks shall be installed to provide 2" horizontal separation and 6" vertical separation between systems. G. Open cable shall only be installed where specifically shown on the drawings, or permitted in these specifications. 3.6 WIRING CONNECTIONS AND TERMINATIONS A. Splice and tap only in accessible junction boxes. B. Use solderless, tin-plated copper, compression terminals (lugs) applied with circumferential crimp for conductor terminations, 8 AWG and larger. C. Use solderless, tin-plated, compression terminals (lugs) applied with indenter crimp for copper conductor terminations, 10 AWG and smaller. D. Use solderless pressure connectors with insulating covers for copper wire splices and taps, 8 AWG and smaller. For 10 AWG and smaller, use insulated spring wire connectors with plastic caps. E. Use compression connectors applied with circumferential crimp for conductor splices and taps, 6 AWG and larger. Tape uninsulated conductors and connectors with electrical tape to 150 percent of the insulation value of conductor. Cold shrink connector insulator with 1kV rating shall be used in damp and wet locations. F. Thoroughly clean wires before installing lugs and connectors. G. Make splices, taps and terminations to carry full ampacity of conductors without perceptible temperature rise. H. Phase Sequence: All apparatus shall be connected to operate in the phase sequence A-B-C representing the time sequence in which the phase conductors so identified reach positive maximum voltage. I. As a general rule, applicable to switches, circuit breakers, starters, panelboards, switchgear and the like, the connections to phase conductors are intended thus: 1. Facing the front and operating side of the equipment, the phase identification shall be: a. Left to Right - A-B-C 846 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 13 - 6 WIRE AND CABLE b. Top to Bottom - A-B-C J. Connection revisions as required to achieve correct rotation of motors shall be made at the load terminals of the starters or disconnect switches. K. Use antioxidant joint compound on all aluminum conductor terminations. Apply antioxidant joint compound per manufacturer's recommendations. END OF SECTION 26 05 13 847 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 26 - 1 GROUNDING AND BONDING SECTION 26 05 26 GROUNDING AND BONDING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Equipment grounding system B. Grounding electrode system 1.2 REFERENCES A. NFPA 70 - National Electrical Code (NEC) B. CEC California Electrical Code 1.3 SUBMITTALS A. Submit shop drawings under provisions of Section 26 05 00. B. Product Data: For the following: 1. Ground rods. C. Product Data: For each type of product indicated. D. Indicate layout of ground field, location of system grounding electrode connections, and routing of grounding electrode conductor and ground ring. 1.4 SUMMARY A. This section includes grounding of electrical systems and equipment. Grounding requirements specified in this Section may be supplemented by special requirements of systems described in other Sections. PART 2 - PRODUCTS 2.1 GROUNDING CONDUCTORS A. For insulated conductors, comply with Division 26 Section 26 05 13 "Wire and Cable". B. Material: Copper. C. Equipment Grounding Conductors: Insulated. Refer to Section 26 05 53 for insulation color. D. Grounding Electrode Conductors: Stranded cable. 848 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 26 - 2 GROUNDING AND BONDING E. Underground Conductors: Bare, tinned, stranded, unless otherwise indicated. F. Copper Bonding Conductors: As follows: 1. Bonding Conductor: No. 4 or No. 6 AWG, stranded copper conductor. G. GB; Grounding Bar: 1. Bare, annealed copper bars of rectangular cross section, with insulators. 1/4" x 2", length of technology or applicable room. H. IBT; Intersystem Bonding Termination: 1. Copper bar, 1/4" x 2" x 24". Provide with wall mounting brackets, insulators and pre-tapped holes. 2. Manufacturers: a. Harger GBI Series. b. Erico EGB Series. 2.2 GROUNDING ELECTRODES A. Ground Rods Copper-clad steel Stainless steel. PART 3 - EXECUTION 3.1 CONNECTIONS A. General: Make connections so galvanic action or electrolysis possibility is minimized. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact will be galvanically compatible. 1. Use electroplated or hot-tin-coated materials to ensure high conductivity and to make contact points closer to order of galvanic series. 2. Make connections with clean, bare metal at points of contact. 3. Make aluminum-to-steel connections with stainless-steel separators and mechanical clamps. 4. Make aluminum-to-galvanized steel connections with tin-plated copper jumpers and mechanical clamps. 5. Coat and seal connections having dissimilar metals with inert material to prevent future penetration of moisture to contact surfaces. B. Equipment Grounding Conductor Terminations: For No. 8 AWG and larger, use pressure-type grounding lugs. No. 10 AWG and smaller grounding conductors may be terminated with winged pressure-type connectors. 849 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 26 - 3 GROUNDING AND BONDING C. Noncontact Metal Raceway Terminations: If metallic raceways terminate at metal housings without mechanical and electrical connection to housing, terminate each conduit with a grounding bushing. Connect grounding bushings with a bare grounding conductor to grounding bus or terminal in housing. Bond electrically non-continuous conduits at entrances and exits with grounding bushings and bare grounding conductors, unless otherwise indicated. D. Underground Connections: Exothermic-welded connections.Use for underground connections, except those at test wells. E. Connections at back boxes, junction boxes, pull boxes, and equipment terminations: The equipment grounding conductor(s) associated with all circuits in the box shall be connected together and to the box using a suitable grounding screw. The removal of the respective receptacle, luminaire, or other device served by the box shall not interrupt the grounding continuity. The connection to the non-metallic boxes shall be made to any metallic fitting or device requiring grounding. F. Tighten screws and bolts for grounding and bonding connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B. G. Moisture Protection: If insulated grounding conductors are connected to ground rods or grounding buses, insulate entire area of connection and seal against moisture penetration of insulation and cable. 3.2 INSTALLATION A. Use only copper conductors for both insulated and bare grounding conductors in direct contact with earth, concrete, masonry, crushed stone, and similar materials. B. Grounding Conductors: Route along shortest and straightest paths possible, unless otherwise indicated. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage. Each grounding conductor that passes through a below grade wall must be provided with a waterstop. C. Grounding electrode conductor (GEC) shall be protected from physical damage by rigid polyvinyl chloride conduit (PVC) in exposed locations. D. Bonding Straps and Jumpers: Install so vibration by equipment mounted on vibration isolation hangers and supports is not transmitted to rigidly mounted equipment. Use exothermic-welded connectors for outdoor locations, unless a disconnect-type connection is required; then use a bolted clamp. Bond straps directly to the basic structure, taking care not to penetrate any adjacent parts. Install straps only in locations accessible for maintenance. E. In raceways, use insulated equipment grounding conductors. F. Underground Grounding Conductors: Use copper conductor, No. 2/0 AWG minimum. Bury at least 24 inches below grade or bury 12 inches above duct bank when installed as part of the duct bank. 850 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 26 - 4 GROUNDING AND BONDING G. Grounding Bus: Install in electrical and telephone equipment rooms, in rooms housing service equipment, below access floors, and elsewhere as indicated, with bolted connections to form a continuous ground path. 3.3 EQUIPMENT GROUNDING SYSTEM A. Comply with Electrical Code, for types, sizes, and quantities of equipment grounding conductors, unless specific types, larger sizes, or more conductors than required by Electrical Code are indicated. B. Install equipment grounding conductors in all feeders and circuits. Terminate each end on a grounding lug or bus. C. Install insulated equipment grounding conductor with circuit conductors for the following items, in addition to those required by Electrical Code: 1. Lighting and receptacle circuits. Terminate each end on a grounding lug or bus. 2. Single-phase and three-phase motor and appliance branch circuits. 3. Flexible raceway runs, including FMC and LFMC. 4. Armored and metal-clad cable runs. D. Nonmetallic Raceways: Install an equipment grounding conductor in nonmetallic raceways unless they are designated for telephone or data cables. 3.4 BONDING SYSTEM A. Isolated Equipment Enclosure: For designated equipment supplied by a branch circuit or feeder, isolate equipment enclosure from supply raceway with a nonmetallic raceway fitting listed for the purpose. Install fitting where raceway enters enclosure, and install a separate equipment bonding conductor. B. Exterior Metallic Pull and Junction Box Covers, Metallic Hand Rails: Bond to grounding system using flexible grounding conductors. C. Equipment Circuits: Install a bonding conductor to duct-mounted electrical devices operating at 120 V and more, including air cleaners, dampers, and heaters. Bond conductor to each unit and to air duct. Bond interior metal piping systems and metal air ducts to equipment grounding conductors of associated pumps, fans, blowers, electric heaters, and air cleaners. Use braided-type bonding straps or copper conductor sized equal to the equipment grounding conductor. D. Connect bonding conductors to metal water pipe using a suitable ground clamp. Make connections to flanged piping at street side of flange. Provide bonding jumper around water meter. E. Signal and Communication Systems: For telephone, alarm, voice and data, and other communication systems, provide No. 6 AWG minimum insulated bonding conductor in raceway from grounding electrode system to each service location, terminal cabinet, wiring closet, and central equipment location. Leave 10 feet of slack conductor at terminal board. 851 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 26 - 5 GROUNDING AND BONDING F. Telecom Service and Central Equipment Locations and Wiring Closets: Terminate grounding conductor on a 1/4-by-2-by-12-inch grounding bar. G. Terminal Cabinets: Terminate bonding conductor on cabinet grounding terminal. H. Remote control, signaling, and fire alarm circuits shall be bonded in accordance with the most recent version of the National Electric Code. I. Metal Poles Supporting Outdoor Lighting Fixtures > 15 feet: Provide a grounding electrode in addition to installing a separate equipment grounding conductor with supply branch-circuit conductors. J. Common Ground Bonding with Lightning Protection System: Bond electrical power system ground directly to lightning protection system grounding conductor at closest point to electrical service grounding electrode. Use bonding conductor sized same as system grounding electrode conductor, and install in conduit. 3.5 GRADING AND PLANTING A. Restore surface features, including vegetation, at areas disturbed by Work of this Section. Reestablish original grades, unless otherwise indicated. If sod has been removed, replace it as soon as possible after backfilling is completed. Restore areas disturbed by trenching, storing of dirt, cable laying, and other activities to their original condition. Include application of topsoil, fertilizer, lime, seed, sod, sprig, and mulch. Comply with Division 2. Maintain restored surfaces. Restore disturbed paving. END OF SECTION 26 05 26 852 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 27 - 1 SUPPORTING DEVICES SECTION 26 05 27 - SUPPORTING DEVICES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Conduit and Equipment Supports B. Fastening Hardware C. Concrete Housekeeping Pads 1.2 QUALITY ASSURANCE A. Support systems shall be adequate for weight of equipment and conduit, including wiring, which they carry. 1.3 COORDINATION A. Coordinate size, shape and location of concrete pads with section on Cast-in-Place Concrete or Concrete Topping. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Allied Support Systems B. Cooper B-Line C. Erico, Inc. D. Hilti E. Power Fasteners F. Orbit Industries 2.2 MATERIAL A. Support Channel: Hot-dip galvanized; painted steel for interior/dry locations. All field cut ends shall be touched up with matching finish to inhibit rusting. B. Hardware: Corrosion resistant. C. Anchorage and Structural Attachment Components: 1. Strength: Defined in reports by ICBO Evaluation Service or another agency acceptable to Authorities Having Jurisdiction. 853 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 27 - 2 SUPPORTING DEVICES a. Structural Safety Factor: Strength in tension and shear of components used shall be at least two times the maximum seismic forces to which they will be subjected. 2. Through Bolts: Structural type, hex head, high strength. Comply with ASTM A 325. 3. Concrete Anchors: Fasten to concrete using cast-in or post-installed anchors designed per the requirements of Appendix D of ACI 318-05. Post-installed anchors shall be qualified for use in cracked concrete by ACI-355.2. D. Concrete Housekeeping Pads: 1. Concrete bases for all floor mounted equipment and wall mounted equipment which is surface mounted and extends to within 6" of the finished floor, unless shown otherwise on the drawings, shall be 3-1/2" thick concrete. 2. Bases shall extend 3" on all sides of the equipment (6" larger than factory base). 3. Where the base is less than 12" from a wall, the base shall be carried to the wall to prevent a "dirt-trap". 4. Concrete materials and workmanship required for the Contractor's work shall be provided by the Contractor. Materials and workmanship shall conform to the applicable standards of the Portland Cement Association. Reinforce with 6" x 6", W1.4-W1.4 welded wire fabric. Concrete shall withstand 3,000 pounds compression per square inch at twenty-eight days. E. Rooftop Support System: 1. Provide pre-fabricated roof supports for all conduit and equipment installed above the roof. Support all conduit and equipment a minimum of 4" above roof. 2. Support system shall be compatible with single ply, bituminous, metal, and spray foam roof systems. The base shall be rounded to prevent damage to the roof, and drainage holes shall prevent ponding of water in the support. 3. All metal components shall be hot dipped galvanized. Mounting hardware shall be stainless steel or hot dipped galvanized. Support shall be UV, corrosion, and freeze/thaw resistant. Support shall include orange paint, reflective safety orange accents, or similar markings for increased visibility. 4. Products: a. Anvil International HBS-Base Series b. Cooper B-Line Dura-Blok c. Erico Caddy Pyramid 50, 150, 300, or 600 (to match load). F. Truss and Joist Support System: Provided the installation complies with all loading requirements of truss and joist manufacturers, the following practices are acceptable: 1. Loads of 100 lbs. or less may be attached anywhere along the top or bottom chords of trusses or joists with a minimum 3' spacing between loads. 2. Loads greater than 100 lbs. must be hung concentrically and may be hung from top or bottom chord, provided one of the following conditions is met: a. The hanger is attached within 6" from a web/chord joint. b. Additional L2x2x1/4 web reinforcement is installed per manufacturer's requirements. 854 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 27 - 3 SUPPORTING DEVICES 3. It is prohibited to cantilever a load using an angle or other structural component that is attached to a truss or joist in such a fashion that a torsional force is applied to that structural member. 4. If conditions cannot be met, coordinate installation with truss or joist manufacturer and contact Architect/Engineer. PART 3 - EXECUTION 3.1 INSTALLATION A. Fasten hanger rods, conduit clamps, and outlet and junction boxes to building structure using expansion anchors in concrete and beam clamps on structural steel. B. Trapeze support installation: Cut hanger rods back at trapeze supports so they do not extend more than 3/4" below bottom face of lowest fastener and blunt any sharp edges. C. Use toggle bolts or hollow wall fasteners in hollow masonry, plaster, or gypsum board partitions and walls; expansion anchors or preset inserts in solid masonry walls; self- drilling anchors or expansion anchor on concrete surfaces; sheet metal screws in sheet metal studs; and wood screws in wood construction. D. Do not fasten supports to ceiling systems, piping, ductwork, mechanical equipment, or conduit, unless otherwise noted. E. Do not use powder-actuated anchors without specific permission. F. Do not drill structural steel members. G. Fabricate supports from structural steel or steel channel, rigidly welded or bolted to present a neat appearance. Use hexagon head bolts with spring lock washers under all nuts. H. In wet locations and on all building floors below exterior earth grade install free- standing electrical equipment on concrete pads. I. Install cabinets and panelboards with minimum of four anchors. Provide horizontal backing/support framing in stud walls for rigid mounting. Provide steel channel supports to stand surface-mounted panelboard or cabinet one inch off wall. J. Bridge studs top and bottom with channels to support flush-mounted cabinets and panelboards in stud walls. K. Refer to Section 26 05 33 for special conduit supporting requirements. 3.2 FINISH A. Prime coat exposed steel hangers and supports. Hangers and supports in crawl spaces, pipe shafts, and above suspended ceiling spaces are not considered exposed. 855 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 27 - 4 SUPPORTING DEVICES B. Trim all ends of exposed field fabricated steel hangers, slotted channel and threaded rod to within 1" of support or fastener to eliminate potential injury to personnel unless shown otherwise on the drawings. Smooth ends and install elastomeric insulation with two coats of latex paint if exposed steel is within 6'-6" of finish floor and presents potential injury to personnel. END OF SECTION 26 05 27 856 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 1 CONDUIT AND BOXES SECTION 26 05 33 CONDUIT AND BOXES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Rigid metallic conduit and fittings (RMC) B. Intermediate metallic conduit and fittings (IMC) C. Electrical metallic tubing and fittings (EMT) D. Flexible metallic conduit and fittings (FMC) E. Rigid polyvinyl chloride conduit and fittings (PVC) F. Wall and ceiling outlet boxes G. Pull and junction boxes 1.2 RELATED WORK A. Section 26 05 53 - Electrical Identification: Refer to electrical identification for color and identification labeling requirements. 1.3 REFERENCES A. American National Standards Institute (ANSI): 1. ANSI C80.1 - Rigid Steel Conduit, Zinc-Coated 2. ANSI C80.3 - Electrical Metallic Tubing, Zinc-Coated and Fittings 3. ANSI C80.4 - Fittings for Rigid Metal Conduit and Electrical Metallic Tubing 4. ANSI C80.6 - Intermediate Metal Conduit, Zinc Coated 5. ANSI/NEMA OS 1 - Sheet-Steel Outlet Boxes, Device Boxes, Covers and Box Supports 6. ANSI/NEMA OS 2 - Nonmetallic Outlet Boxes, Device Boxes, Covers and Box Supports B. Federal Specifications (FS): 1. A-A-50553A - Fittings for Conduit, Metal, Rigid, (Thick-Wall and Thin-Wall (EMT) Type 2. A-A-55810 - Specification for Flexible Metal Conduit C. NECA "Standards of Installation" D. National Electrical Manufacturers Association (NEMA): 857 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 2 CONDUIT AND BOXES 1. ANSI/NEMA FB 1 - Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing and Cable 2. RN 1 - Polyvinyl chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit, Rigid Aluminum Conduit, and Intermediate Metal Conduit 3. TC 2 - Electrical Polyvinyl Chloride (PVC) Conduit 4. TC 9 - Fittings for PVC Plastic Utilities Duct for Underground Installation E. NFPA 70 - National Electrical Code (NEC) F. CEC California Electrical Code G. Underwriters Laboratories (UL): Applicable Listings 1. UL 1 - Flexible Metal Conduit 2. UL 6 - Rigid Metal Conduit 3. UL 360 - Liquid Tight Flexible Steel Conduit 4. UL514-B - Conduit Tubing and Cable Fittings 5. UL651-A - Type EB and a PVC Conduit and HDPE Conduit 6. UL651-B - Continuous Length HDPE Conduit 7. UL746A - Standard for Polymeric Materials - Short Term Property Evaluations 8. UL797 - Electrical Metal Tubing 9. UL1242 - Intermediate Metal Conduit H. American Standard of Testing and Materials (ASTM): 1. ASTM D 570 - Standard Test Method for Water Absorption of Plastics 2. ASTM D 638 - Standard Test Method for Tensile Properties of Plastics 3. ASTM D 648 - Standard Test Method for Deflection Temperature of Plastics under Flexural Load in the Edge Wise Position 4. ASTM D 2412 - Standard Test Method for Determination of External Loading Characteristics of Plastic Pipe by Parallel-Plate Loading 5. ASTM D 2447 - Standard Specification for Polyethylene (PE) Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter 6. ASTM D 3350 - Standard Specification for Polyethylene Plastic Pipe and Fittings Material I. Definitions: 1. Fittings: Conduit connection or coupling. 2. Body: Enlarged fittings with opening allowing access to the conductors for pulling purposes only. 3. Mechanical Spaces: Enclosed areas, usually kept separated from the general public, where the primary use is to house service equipment and to route services. These spaces generally have exposed structures, bare concrete and non-architecturally emphasized finishes. 4. Finished Spaces: Enclosed areas where the primary use is to house personnel and the general public. These spaces generally have architecturally emphasized finishes, ceilings and/or floors. 5. Concealed: Not visible by the general public. Often indicates a location either above the ceiling, in the walls, in or beneath the floor slab, in column coverings, or in the ceiling construction. 858 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 3 CONDUIT AND BOXES 6. Above Grade: Not directly in contact with the earth. For example, an interior wall located at an elevation below the finished grade shall be considered above grade but a wall retaining earth shall be considered below grade. 7. Slab: Horizontal pour of concrete used for a floor or sub-floor. PART 2 - PRODUCTS 2.1 RIGID METALLIC CONDUIT (RMC) AND FITTINGS A. Manufacturers: 1. Allied 2. LTV 3. Steelduct 4. Calbond Calpipe 5. Wheatland Tube Co 6. O-Z Gedney 7. or approved equal. B. Manufacturers of RMC Conduit Fittings: 1. Appleton Electric 2. O-Z/Gedney Co. 3. Electroline 4. Raco 5. Bridgeport 6. Midwest 7. Regal 8. Thomas & Betts 9. Crouse-Hinds 10. Killark 11. Orbit Industries 12. or approved equal. C. Minimum Size Galvanized Steel: 3/4 inch, unless otherwise noted. D. Fittings and Conduit Bodies: 1. End Bell Fittings: Malleable iron, hot dip galvanized, threaded flare type with provisions for mounting to form. 2. Expansion Joints: Malleable iron and hot dip galvanized providing a minimum of 4 inches of movement. Fitting shall be watertight with an insulating bushing and a bonding jumper. 3. Conduit End Bushings: Malleable iron type with molded-on high impact phenolic thermosetting insulation. Where required elsewhere in the contract documents, bushing shall be complete with ground conductor saddle and clamp. High impact phenolic threaded type bushings are not acceptable. 4. All other fittings and conduit bodies shall be of malleable iron construction and hot dip galvanized. 859 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 4 CONDUIT AND BOXES 2.2 ELECTRICAL METALLIC TUBING (EMT) AND FITTINGS A. Minimum Size Electrical Metallic Tubing: 3/4 inch, unless otherwise noted. B. Manufacturers of EMT Conduit: 1. Allied 2. Calbond Calpipe 3. LTV 4. Steelduct 5. Wheatland Tube Co 6. or approved equal. C. Fittings and Conduit Bodies: 1. 2" Diameter or Smaller: Compression type of steel designed for their specific application. 2. 1/2" and 3/4" Conduit: Push-on connectors and couplers with locking ring and washer of zinc plated steel, listed for use in dry locations. 3. Larger than 2": Compression type of steel designed for their specific application. 4. Manufacturers of EMT Conduit Fittings: a. Appleton Electric b. O-Z/Gedney Co. c. Electroline d. Raco e. Bridgeport f. Midwest g. Regal h. Thomas & Betts i. Orbit Industries j. or approved equal. 2.3 FLEXIBLE METALLIC CONDUIT (FMC) AND FITTINGS A. Minimum Size Galvanized Steel: 3/4 inch, unless otherwise noted. Lighting branch circuit wiring to an individual luminaire may be a manufactured, UL listed 3/8" flexible metal conduit and fittings with #14 AWG THHN conductors and an insulated ground wire. Maximum length of 3/8" FMC shall be six (6) feet. B. Manufacturers: 1. American Flex 2. Alflex 3. Electri-Flex Co 4. or approved equal. C. Construction: Flexible steel, approved for conduit ground, zinc coated, threadless type formed from a continuous length of spirally wound, interlocked zinc coated strip steel. Provide a separate equipment grounding conductor when used for equipment where flexibility is required. D. Fittings and Conduit Bodies: 860 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 5 CONDUIT AND BOXES 1. Threadless hinged clamp type, galvanized zinc coated cadmium plated malleable cast iron or screw-in type, die-cast zinc. 2. Fittings and conduit bodies shall include plastic or cast metal inserts supplied by the manufacturer to protect conductors from sharp edges. 3. Manufacturers: a. O-Z/Gedney Co. b. Thomas & Betts c. Appleton Electric d. Electroline e. Bridgeport f. Midwest g. Regal h. Orbit Industries i. or approved equal. 2.4 RIGID NON-METALLIC CONDUIT (PVC) AND FITTINGS A. Minimum Size Rigid Smooth-Wall Nonmetallic Conduit: 3/4 inch, unless otherwise noted. B. Acceptable Manufacturers: 1. Carlon (Lamson & Sessions) Type 40 2. Cantex, J.M. Mfg. 3. or approved equal. C. Construction: Schedule 40 and Schedule 80 rigid polyvinyl chloride (PVC), UL labeled for 90°C. D. Fittings and Conduit Bodies: NEMA TC 3; sleeve type suitable for and manufactured especially for use with the conduit by the conduit manufacturer. E. Plastic cement for joining conduit and fittings shall be provided as recommended by the manufacturer. ASTM Test Description Values HDPE D-1505 Density g/CM 3 less than 0.941 D-1238 Melt Index, g/10 min Condition E greater than 0.55 grams/10 min. D-638 Tensile Strength at yield (psi) 3000 min. D-1693 Environmental Stress Crack Resistance Condition B, F 20 96 hrs. D-790 Flexural Modulus, MPa (psi) less than 80,000 D-746 Brittleness Temperature -75°C Max 2.5 OUTLET BOXES A. Sheet Metal Outlet Boxes: ANSI/NEMA OS 1; galvanized steel, 16 gauge (approximately 0.0625 inches), with 1/2-inch male fixture studs where required. 861 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 6 CONDUIT AND BOXES B. Outlet boxes for luminaires to be not less than 1-1/2" deep, deeper if required by the number of wires or construction. The box shall be coordinated with surface luminaires to conceal the box from view or provide a finished trim plate. C. Switch outlet boxes for local light control switches, dimmers and occupancy sensors shall be 4 inches square by 2-1/8 inches deep, with raised cover to fit flush with finish wall line. Multiple gang switch outlets shall consist of the required number of gang boxes appropriate to the quantity of switches comprising the gang. Where walls are plastered, provide a plaster raised cover. Where switch outlet boxes occur in exposed concrete block walls, boxes shall be installed in the block cavity with a raised square edge tile cover of sufficient depth to extend out to face of block or masonry boxes. D. Outlet boxes for telephone substations in walls and columns shall be 4 inches square and 2-1/8 inches deep with single gang raised cover to fit flush with finished wall line equipped with flush telephone plate. E. Wall or column receptacle outlet boxes shall be 4 inches square with raised cover to fit flush with finished wall line. Boxes in concrete block walls shall be installed the same as for switch boxes in block walls. 2.6 JB; PULL AND JUNCTION BOXES A. Sheet Metal Boxes: ANSI/NEMA OS 1; galvanized steel. B. Sheet metal boxes larger than 12 inches in any dimension that contain terminations or components: Continuous hinged enclosure with 1/4 turn latch and white back panel for mounting terminal blocks and electrical components. C. Flanged type boxes shall be used where installed flush in wall. PART 3 - EXECUTION 3.1 CONDUIT INSTALLATION SCHEDULE AND SIZING A. In the event the location of conduit installation represents conflicting installation requirements as specified in the following schedule, a clarification shall be obtained from the Architect/Engineer. If this Contractor is unable to obtain a clarification as outlined above, concealed rigid galvanized steel conduit installed per these specifications and the Electrical Code shall be required. B. Installation Schedule: Refer to drawings. C. Size conduit as shown on the drawings and specifications. Where not indicated in the contract documents, conduit size shall be according to the Electrical Code. Conduit and conductor sizing shall be coordinated to limit conductor fill to less than 40%, maintain conductor ampere capacity as required by the Electrical Code (to include enlarged conductors due to temperature and quantity derating values) and to prevent excessive voltage drop and pulling tension due to long conduit/conductor lengths. D. Minimum Conduit Size (Unless Noted Otherwise): 862 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 7 CONDUIT AND BOXES 1. Above Grade: 3/4 inch. (The use of 1/2 inch would be allowed for installation conduit to individual light switches, individual receptacles and individual fixture whips from junction box.) 2. Below Grade 5' or less from Building Foundation: 1 inch. 3. Below Grade More than 5' from Building Foundation: 1 inch. 4. Telecommunication Conduit: 1 inch. 5. Controls Conduit: 3/4 inch. E. Conduit sizes shall change only at the entrance or exit to a junction box, unless specifically noted on the drawings. 3.2 CONDUIT ARRANGEMENT A. In general, conduit shall be installed concealed in walls, in finished spaces and where possible or practical, or as noted otherwise. Conduit shall be installed parallel or perpendicular to walls, ceilings, and exposed structural members. In unfinished spaces, mechanical and utility areas, conduit may run either concealed or exposed as conditions dictate and as practical unless noted otherwise on drawings. Installation shall maintain headroom in exposed vicinities of pedestrian or vehicular traffic. B. Exposed conduit on exterior walls or above roof will not be allowed without prior written approval of Architect/Engineer. A drawing of the proposed routing and a photo of the location shall be submitted 14 days prior to start of conduit rough-in. Routing shall be shown on coordination drawings. C. Conduit shall not share the same cell as structural reinforcement in masonry walls. D. Conduit runs shall be routed as shown on large scale drawings. Conduit routing on drawings scaled 1/4"=1'-0" or less shall be considered diagrammatic, unless noted otherwise. The correct routing, when shown diagrammatically shall be chosen by the Contractor based on information in the contract documents, in accordance with manufacturer's written instructions, applicable codes, the NECA's "Standard of Installation", in accordance with recognized industry standards, and coordinated with other contractors. E. Contractor shall adapt Contractor's work to the job conditions and make such changes as required and permitted by the Architect/Engineer, such as moving to clear beams and joists, adjusting at columns, avoiding interference with windows, etc., to permit the proper installation of other mechanical and/or electrical equipment. F. Contractor shall cooperate with all contractors on the project. Contractor shall obtain details of other contractor's work to ensure fit and avoid conflict. Any expense due to the failure of This Contractor to do so shall be paid for in full by Contractor. The other trades involved as directed by the Architect/Engineer shall perform the repair of work damaged as a result of neglect or error by This Contractor. The resultant costs shall be borne by This Contractor. 3.3 CONDUIT SUPPORT A. Conduit runs installed above a suspended ceiling shall be properly supported. In no case shall conduit rest on the suspended ceiling construction, nor utilize ceiling support system for conduit support. 863 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 8 CONDUIT AND BOXES 1. Support wire used to independently support raceway and wiring systems above suspending ceilings shall be supported on both ends, minimum 12 gauge suspended ceiling support wire, and distinguishable from ceiling support systems by color (field paint), tagging, or equivalent means. B. Conduit shall not be supported from ductwork, water, sprinkler piping, or other non- structural members, unless approved by the Architect/Engineer. All supports shall be from structural slabs, walls, structural members, and bar joists, and coordinated with all other applicable contractors, unless noted otherwise. C. Conduit shall be held in place by the correct size of galvanized one-hole conduit clamps, two-hole conduit straps, patented support devices, clamp back conduit hangers, or by other means if called for on the drawings. D. Support individual horizontal raceways with separate, malleable-iron pipe hangers or clamps. E. Spring-steel conduit clips specifically designed for supporting single conduits or tubing may be used in lieu of malleable-iron hangers for 1-1/2" and smaller raceways serving lighting and receptacle branch circuits above accessible ceilings and for securing raceways to slotted channel and angle supports. F. Group conduits in parallel runs where practical and use conduit racks or trapeze hangers constructed of steel channel, suspended with threaded solid rods or wall mounted from metal channels with conduit straps or clamps. Provide space in each rack or trapeze for 25% additional conduits. G. Do not exceed 25 lbs. per hanger and a minimum spacing of 2'-0" on center when attaching to metal roof decking (excludes concrete on metal deck). This 25 lbs. load and 2'-0" spacing include adjacent electrical and mechanical items hanging from deck. If the hanger restrictions cannot be achieved, supplemental framing off steel framing will need to be added. H. Arrange supports in vertical runs so the weight of raceways and enclosed conductors is carried entirely by raceway supports, with no weight load on raceway terminals. I. Supports for metallic conduit shall be no greater than 10 feet. A smaller interval may be used if necessitated by building construction, but in no event shall support spans exceed the Electrical Code requirements. Conduit shall be securely fastened within 3 feet of each outlet box, junction box, device box, cabinet, or fitting. J. Supports of flexible conduit shall be within 12 inches of each outlet box, junction box, device box, cabinet, or fitting and at intervals not to exceed 4.5 feet. K. Supports for non-metallic conduit shall be at sufficiently close intervals to eliminate any sag in the conduit. The manufacturer's recommendations shall be followed, but in no event shall support spans exceed the Electrical Code requirements. L. Where conduit is to be installed in poured concrete floors or walls, provide concrete- tight conduit inserts securely fastened to forms to prevent conduit misplacement. M. Finish: -- 864 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 9 CONDUIT AND BOXES 1. Prime coat exposed steel hangers and supports. Hangers and supports in crawl spaces, pipe shafts, and above suspended ceiling spaces are not considered exposed. 2. Trim all ends of exposed field fabricated steel hangers, slotted channel and threaded rod to within 1" of support or fastener to eliminate potential injury to personnel unless shown otherwise on the drawings. Smooth ends and install elastomeric insulation with two coats of latex paint if exposed steel is within 6'-6" of finish floor and presents potential injury to personnel. 3.4 CONDUIT INSTALLATION A. Conduit Connections: 1. Shorter than standard conduit lengths shall be cut square using industry standards. The ends of all conduits cut shall be reamed or otherwise finished to remove all rough edges. 2. Metallic conduit connections in slab on grade installation shall be sealed and one coat of rust inhibitor primer applied after the connection is made. 3. Where conduits with tapered threads cannot be coupled with standard couplings, then approved split or Erickson couplings shall be used. Running threads will not be permitted. B. Conduit terminations for all low voltage wiring shall have nylon bushings installed on each end of every conduit run. C. Conduit Bends: 1. Use a hydraulic one-shot conduit bender or factory elbows for bends in conduit 2" in size or larger. All steel conduit bending shall be done cold; no heating of steel conduit shall be permitted. 2. All bends of rigid polyvinyl chloride conduit (PVC) shall be made with the manufacturer's approved bending equipment. The use of spot heating devices will not be permitted (i.e. blow torches). 3. A run of conduit shall not contain more than the equivalent of four (4) quarter bends (360°), including those bends located immediately at the outlet or body. 4. Telecommunications conduits shall have no more than two (2) 90-degree bends between pull points and contain no continuous sections longer than 100 feet. Insert pull points or pull boxes for conduits exceeding 100 feet in length. a. A third bend is acceptable if: 1) The total run is not longer than (33) feet. 2) The conduit size is increased to the next trade size. 5. Telecommunications pull boxes shall not be used in lieu of a bend. Align conduits that enter the pull box from opposite ends with each other. Pull box size shall be twelve (12) times the diameter of the largest conduit. Slip sleeves or gutters can be used in place of a pull box. 6. Telecommunications Conduit(s): Maintain appropriate conduit bend radius at all times. For conduits with an internal diameter of less than 2", maintain a bend radius of at least 6 times the internal diameter. For conduits with an internal diameter 2" or greater, maintain a bend radius of at least 10 times the internal diameter. -- 865 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 10 CONDUIT AND BOXES 7. Rigid polyvinyl chloride conduit (PVC) runs longer than 100 feet or runs which have more than two 90° equivalent bends (regardless of length) shall use rigid metal or RTRC factory elbows for bends. 8. Use conduit bodies to make sharp changes in direction (i.e. around beams). D. Conduit Placement: 1. Conduit shall be mechanically continuous from source of current to all outlets. Conduit shall be electrically continuous from source of current to all outlets, unless a properly sized grounding conductor is routed within the conduit. All metallic conduits shall be bonded per the Electrical Code. 2. Route exposed conduit and conduit above suspended ceilings (accessible or not) parallel/perpendicular to the building structural lines, and as close to building structure as possible. Wherever possible, route horizontal conduit runs above water and steam piping. 3. Route conduit through roof openings provided for piping and ductwork where possible. If not provided or routing through provided openings is not possible, route through roof jack with pitch pocket. Coordinate roof penetrations with other trades. 4. Conduits, raceway, and boxes shall not be installed in concealed locations in less than 1.5" below bottom of roof decking. 5. Avoid moisture traps where possible. Where unavoidable, provide a junction box with drain fitting at conduit low point. 6. All conduits through walls shall be grouted or sealed into openings. Where conduit penetrates firewalls and floors, seal with a UL listed sealant. ; refer to Section 26 05 03 for through penetration firestopping requirements. 7. Seal interior of conduit at exterior entries, air handling units, coolers/freezers, etc., and where the temperature differential can potentially be greater than 20°F, to prevent moisture penetration. Seal shall be placed where conduit enters warm space. Conduit seal fitting shall be a drain/seal, with sealing compound, identified for use with cable and raceway system, equal to O-Z/Gedney type EYD. 8. Horizontal conduit routing through slabs above grade a. Conduits, if run in concrete structure, shall be in middle one-third of slab thickness, and leave at least 3" min. concrete cover. Conduits shall run parallel to each other and spaced at least 8" apart centerline to centerline. Secure raceways to reinforcing rods to prevent sagging or shifting during concrete placement. Maximum conduit outside diameter 1". b. No conduits are allowed in concrete on metal deck unless expressly approved in writing by the Structural Engineer of Record. c. No conduits are allowed to be routed horizontally through slabs above grade. 9. Do not route conduits across each other in slabs on grade. 10. Rigid polyvinyl chloride conduit (PVC) shall be installed when material surface temperatures and ambient temperature are greater than 40°F. 11. Where rigid polyvinyl chloride conduit (PVC) is used below grade, in a slab, below a slab, etc., a transition to rigid galvanized steel or PVC-coated steel conduit shall be installed before conduit exits earth. The metallic conduit shall extend a minimum of 6" into the surface concealing the non-metallic conduit. 12. Contractor shall provide suitable mechanical protection around all conduits stubbed out from floors, walls or ceilings during construction to prevent bending or damaging of stubs due to carelessness with construction equipment. 866 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 11 CONDUIT AND BOXES 13. Contractor shall provide a polypropylene pull cord with 2000 lbs. tensile strength in each empty conduit (indoor and outdoor), except in sleeves and nipples. 14. Telecommunications conduits that protrude through the structural floor shall be installed 1 to 3" above finished floor (AFF). 15. Telecommunications conduits that enter into Telecommunications rooms below the finished ceiling shall terminate a minimum of 4" below ceiling and as close to the wall as possible. 16. Telecommunications conduits that are below grade and enter into a building shall terminate a minimum of 4" above finished floor (AFF) and as close to the wall as possible. 3.5 CONDUIT TERMINATIONS A. Where conduit bonding is indicated or required in the contract documents, the bushings shall be a grounding type sized for the conduit and ground bonding conductor as manufactured by O-Z/Gedney, Appleton, Thomas & Betts, Burndy, Regal, Orbit Industries or approved equal. B. Conduits with termination fittings shall be threaded for one (1) lock nut on the outside and one (1) lock nut and bushing on the inside of each box. C. Where conduits terminate in boxes with knockouts, they shall be secured to the boxes with lock nuts and provided with approved screw type tinned iron bushings or fittings with plastic inserts. D. Where conduits terminate in boxes, fittings, or bodies with threaded openings, they shall be tightly screwed against the shoulder portion of the threaded openings. E. Conduit terminations to all motors shall be made with flexible metallic conduit (FMC), unless noted otherwise. Final connections to roof exhaust fans, or other exterior motors and motors in damp or wet locations shall be made with liquidtight flexible metallic conduit (LFMC). Flexible conduit shall not exceed 6' in length. Route equipment ground conductors from circuit ground to motor ground terminal through flexible conduit. F. Rigid polyvinyl chloride conduit (PVC) shall be terminated using fittings and bodies produced by the manufacturer of the conduit, unless noted otherwise. Prepare conduit as per manufacturer's recommendations before joining. All joints shall be solvent welded by applying full even coat of plastic cement to the entire areas that will be joined. Turn the conduit at least a quarter to one half turn in the fitting and let the joint cure for 1-hour minimum or as per the manufacturer's recommendations. G. All conduit ends shall be sealed with plastic immediately after installation to prevent the entrance of any foreign matter during construction. The seals shall be removed and the conduits blown clear of all foreign matter prior to any wires or pull cords being installed. 3.6 RIGID POLYVINYL CHLORIDE CONDUIT (PVC) OVERHEAD CONDUIT INSTALLATION A. Conduit shall be installed away from high temperature piping and equipment. B. Conduit shall be installed to prevent exposure to ultraviolet radiation. 867 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 12 CONDUIT AND BOXES C. Proper allowances shall be made for expansion and/or contraction of the conduit during installation. D. Expansion fittings shall be installed in any 100' continuous run of conduit and at each 100' thereafter. E. Supports shall be made from non-corroding materials and spacing shall not be greater than the listing in the Electrical Code, but also shall not exceed the manufacturer's recommendations depending on the expected surface temperature. 3.7 UNDERGROUND CONDUIT INSTALLATION A. Conduit Connections: 1. Conduit joints in a multiple conduit run shall be staggered at least one foot apart. B. Conduit Bends (Lateral): 1. Conduits shall have long sweep radius elbows instead of standard elbows wherever special bends are indicated and noted on the drawings, or as required by the manufacturer of the equipment or system being served. 2. Telecommunications conduit bend radius shall be six times the diameter for conduits under 2" and ten times the diameter for conduits over 2". Where long cable runs are involved, sidewall pressures may require larger radius bends. Coordinate with Architect/Engineer prior to conduit installation to determine bend radius. C. Conduit Elbows (vertical): 1. Minimum metal or RTRC elbow radiuses shall be 30 inches for primary conduits (greater than 600V) and 18 inches for secondary conduits (less than 600V). Increase radius, as required, based on pulling tension calculation requirements. D. Conduit Placement: 1. Conduit runs shall be pitched a minimum of 4" per 100 feet to drain toward the terminations. Duct runs shall be installed deeper than the minimum wherever required to avoid any conflicts with existing or new piping, tunnels, etc. 2. For parallel runs, use suitable separators and chairs installed not greater than 4' on centers. Band conduit together with suitable banding devices. Securely anchor conduit to prevent movement during concrete placement or backfilling. 3. Where concrete is required, the materials for concreting shall be thoroughly mixed to a minimum f'c = 2500 and immediately placed in the trench around the conduits. No concrete that has been allowed to partially set shall be used. 4. Before the Contractor pulls any cables into the conduit, Contractor shall have a mandrel 1/4" smaller than the conduit inside diameter pulled through each conduit and if any concrete or obstructions are found, the Contractor shall remove them and clear the conduit. Spare conduit shall also be cleared of all obstructions. 5. Conduit terminations in manholes, masonry pull boxes, or masonry walls shall be with malleable iron end bell fittings. 6. All spare conduits not terminated in a covered enclosure shall have its terminations plugged as described above. 868 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 13 CONDUIT AND BOXES 7. Ductbanks and conduit shall be installed a minimum of 24" below finished grade, unless otherwise noted on the drawings or elsewhere in these specifications. 8. All non-metallic conduit installed underground outside of a slab shall be rigid. 3.8 BOX INSTALLATION SCHEDULE A. Galvanized steel boxes may be used in: 1. Concealed interior locations above ceilings and in hollow studded partitions. 2. Exposed interior locations in mechanical rooms and in rooms without ceilings; higher than 8' above the highest platform level. 3. Direct contact with concrete except slab on grade. 3.9 COORDINATION OF BOX LOCATIONS A. Provide electrical boxes as shown on the drawings, and as required for splices, taps, wire pulling, equipment connections, and code compliance. B. Electrical box locations shown on the Contract Drawings are approximate, unless dimensioned. Verify location of floor boxes and outlets in offices and work areas prior to rough-in. C. Locate and install boxes to allow access. Avoid interferences with ductwork, piping, structure, equipment, etc. Recessed luminaires shall not be used as access to outlet, pull, and junction boxes. Where installation is inaccessible, provide access doors. Coordinate locations and sizes of required access doors with the Architect/Engineer and General Contractor. D. Locate and install to maintain headroom and to present a neat appearance. 3.10 OUTLET BOX INSTALLATION A. Do not install boxes back-to-back in walls. 1. Provide a minimum horizontal separation of 6 inches between boxes installed on opposite sides of non-rated stud walls. When the minimum separation cannot be maintained, install sound insulation pads on all five sides of the back box in accordance with the manufacturer's instructions. 2. Provide a minimum horizontal separation of 24 inches between boxes installed on opposite sides of fire-rated walls. When the minimum separation cannot be maintained, the box is greater than 16 square inches or the total box area (all trades) per 100 square feet is greater than or equal to 100 square inches, install fire-rated moldable pads to all five sides of the back box to maintain the fire rating of the wall. Install moldable pads in accordance with UL listing for the specific product. Sound insulation pads are not acceptable for use in fire-rated wall applications unless the product carries the necessary fire rating. B. Install sound insulation pads on all five sides of the back of all boxes in sound-rated wall assemblies. Sound-rated wall assemblies are defined as partition types carrying a Sound Transmission Class (STC) rating. 869 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 14 CONDUIT AND BOXES C. The Contractor shall anchor switch and outlet box to wall construction so that it is flush with the finished masonry, paneling, drywall, plaster, etc. The Contractor shall check the boxes as the finish wall surface is being installed to assure that the box is flush. (Provide plaster rings as necessary.) D. Mount at heights shown or noted on the drawings or as generally accepted if not specifically noted. E. Locate boxes in masonry walls to require cutting of masonry unit corner only. Coordinate masonry cutting to achieve neat openings for boxes. F. Provide knockout closures for unused openings. G. Support boxes independently of conduit. H. Use multiple-gang boxes where more than one device is mounted together; do not use sectional boxes. Provide barriers to separate wiring of different voltage systems. I. Install boxes in walls without damaging wall insulation. J. Coordinate mounting heights and locations of outlets mounted above counters. K. Position outlets to locate luminaires as shown on reflected ceiling drawings. L. Provide recessed outlet boxes in finished areas; secure boxes to interior wall and partition studs, accurately positioned to allow for surface finish thickness. Use stamped steel stud bridges for flush outlets in hollow stud wall, and adjustable steel channel fasteners for flush ceiling outlet boxes. M. Align wall-mounted outlet boxes for switches, thermostats, and similar devices. N. Provide cast outlet boxes in exterior locations and wet locations, and where exposed rigid or intermediate conduit is used. 3.11 PULL AND JUNCTION BOX INSTALLATION A. Locate pull boxes and junction boxes above accessible ceilings or in unfinished areas. B. Support pull and junction boxes independent of conduit. C. Do not install boxes back-to-back in walls. 1. Provide a minimum horizontal separation of 6 inches between boxes installed on opposite sides of non-rated stud walls. When the minimum separation cannot be maintained, install sound insulation pads on all five sides of the back box in accordance with the manufacturer's instructions. 870 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 33 - 15 CONDUIT AND BOXES 2. Provide a minimum horizontal separation of 24 inches between boxes installed on opposite sides of fire-rated walls. When the minimum separation cannot be maintained, the box is greater than 16 square inches or the total box area (all trades) per 100 square feet is greater than or equal to 100 square inches, install fire-rated moldable pads to all five sides of the back box to maintain the fire rating of the wall. Install moldable pads in accordance with UL listing for the specific product. Sound insulation pads are not acceptable for use in fire-rated wall applications unless the product carries the necessary fire rating. D. Install sound insulation pads on all five sides of the back of all boxes in sound-rated wall assemblies. Sound-rated wall assemblies are defined as partition types carrying a Sound Transmission Class (STC) rating. 3.12 EXPOSED BOX INSTALLATION A. Boxes shall be secured to the building structure with proper size screws, bolts, hanger rods, or structural steel elements. B. On brick, block and concrete walls or ceilings, exposed boxes shall be supported with no less than two (2) Ackerman-Johnson, Paine, Phillips, or approved equal screw anchors or expansion shields and round head machine screws. Cast boxes shall not be drilled. C. On steel structures, exposed boxes shall be supported to the steel member by drilling and tapping the member and fastening the boxes by means of round head machine screws. D. Boxes may be supported on steel members by APPROVED beam clamps if conduit is supported by beam clamps. E. Boxes shall be fastened to wood structures by means of a minimum of two (2) wood screws adequately large and long to properly support. (Quantity depends on size of box.) F. Wood, plastic, or fiber plugs shall not be used for fastenings. G. Explosive devices shall not be used unless specifically allowed. END OF SECTION 26 05 33 871 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 48 - 1 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS SECTION 26 05 48 - SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Seismic Requirements. 1.2 QUALITY ASSURANCE A. General: 1. The contractor shall retain a specialty consultant or equipment manufacturer to develop a seismic restraint and support system and perform seismic calculations in accordance with these specifications, state, and local codes. 2. Items used for seismic restraint of equipment and systems shall be specifically manufactured for seismic restraint. 3. These requirements are beyond those listed in Section 26 05 27 of these specifications. Where a conflict arises between the seismic requirements of this section and any other section, the Architect/Engineer shall be immediately notified for direction to proceed. B. Manufacturer: 1. System Supports/Restraints: Company specializing in the manufacture of products specified in this Section. 2. Equipment: Each company providing equipment that must meet seismic requirements shall provide certification included in project submittals the equipment supplied for the project meets or exceeds the seismic requirements of the project. C. Testing Agency: An independent testing agency, acceptable to Authorities Having Jurisdiction, with experience and capability to conduct the testing indicated. D. Installer: Company specializing in performing the work of this Section. 1.3 REFERENCES A. International Building Code, 2018. B. California Building Code (CBC) C. ASHRAE - A Practical Guide to Seismic Restraint. D. Technical Manual 5-809-10, NAVFAC P-355, Air Force Manual 88-3, Chapter 13. E. ASCE 7-16, Chapter 13. 872 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 48 - 2 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS 1.4 SUBMITTALS A. Submit under provisions of Section 26 05 00. B. Submittal to Code Official: 1. Contractor shall submit copies of the seismic shop drawings to the governing code authority for approval. C. A seismic restraint designer shall be provided whether or not exceptions listed in the applicable building code are met. If seismic restraints are not provided for a system that requires seismic bracing, the seismic designer shall submit a signed and sealed letter to the Architect/Engineer and Authorities Having Jurisdiction stating the exceptions, along with code reference, utilized for each item. Seismic designer shall review system installation for general conformance to the exception requirements stated in the code and document, in writing, the system has been installed in accordance to the exception. 1.5 TESTING AND INSPECTION A. Special Inspection and Testing shall be done in accordance with Chapter 17 of the International Building Code. B. The Contractor shall employ a Special Inspection Agency to perform the duties and responsibilities specified in Section 1704 and 1705. C. Work performed on the premises of a fabricator approved by the building official need not be tested and inspected. The fabricator shall submit a certificate of compliance that the work has been performed in accordance with the approved plans and specifications to the building official and the Architect and Engineer of Record. D. The Special Inspection Agency shall furnish inspection reports to the building official, the Owner, the Architect, the Engineer of Record, and the General Contractor. The reports shall be completed and furnished within 48 hours of inspected work. A final signed report stating whether the work requiring special inspection was, to the best of the Special Inspection Agency's knowledge, in conformance with the approved plans and specifications shall be submitted. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, protect and handle products to site. Accept material on site in factory containers and packing. Inspect for damage. Protect from damage and contamination by maintaining factory packaging until installation. Follow manufacturer's instructions for storage. 1.7 DESIGN REQUIREMENTS A. This project is subject to the seismic bracing requirements of the International Building Code, 2018 edition. B. This project is subject to the seismic bracing requirements of California Building Code,. 873 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 48 - 3 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS C. Equipment shall meet California Building Code and ASCE 7 seismic qualification requirements in concurrence with ICC ES AC156 Acceptance Criteria for Seismic Qualification by Shake-Table Testing of Nonstructural Components and Systems. D. All seismic anchorage and bracing shall comply with FM Global Property Loss Prevention Data Sheet 1-11, Fire Following Earthquakes. 1.8 COORDINATION A. Coordinate layout and installation of seismic bracing with building structural systems and architectural features, and with mechanical, fire-protection, electrical and other building features in the vicinity. B. Coordinate concrete bases with building structural system. 1.9 WARRANTY A. Provide one-year warranty on parts and labor for manufacturer defects and installation workmanship. PART 2 - PRODUCTS 2.1 SUPPLIERS A. Following is a partial list of manufacturer/supplier contact information for seismic restraints: 1. B-Line Systems, Inc. (800) 851-7415, www.b-line.com. 2. Unistrut Corporation http://www.unistrut.us/ 3. Kinetics Noise Control (877) 457-2695, www.kineticsnoise.com. 4. Mason Industries, Inc. www.mason-ind.com. 5. Loos & Co., Inc. (800) 321-5667, www.loosnaples.com. 6. Tolco (909) 737-5599, www.tolco.com 7. ISAT 877.523.6060, www.isatsb.com 8. Vibro-Acoustics (416) 291-7371, https://virs.vibro-acoustics.com/ 2.2 SEISMIC BRACING AND SUPPORT OF SYSTEMS AND COMPONENTS A. General: 1. Seismic restraint designer shall coordinate all attachments with the Structural Engineer of Record; refer to submittal requirements. 2. The seismic restraint design shall be based on actual equipment data obtained from manufacturer's submittals or the manufacturer. The equipment manufacturer shall verify and provide written certification the attachment points on the equipment can accept the combination of seismic, weight, and other imposed loads. 3. Design analysis shall include calculated dead loads, static seismic loads, and capacity of materials utilized for the connection of the equipment or system to the structure. 874 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 48 - 4 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS 4. Analysis shall detail anchoring methods, bolt diameter, embedment, and weld length. 5. All seismic restraint devices shall be designed to accept without failure the forces calculated per the applicable building code. 6. All seismic restraints and combination isolator/restraints shall have verification of their seismic capabilities witnessed by an independent testing agency. B. Friction from gravity loads shall not be considered resistance to seismic forces. C. Housekeeping Pads: 1. Reinforced housekeeping pads shall be provided to handle shear, tension, and compression forces with proper reinforcement, doweling, and attachments connecting the pad to the structural slab. 2.3 SEISMIC RESTRAINT AND CONSTRUCTION OF EQUIPMENT A. Equipment supplied for the project shall be designed to meet the requirements of lateral forces calculated using the applicable code and method described above. B. The following is a partial list of equipment that shall be restrained and that shall be constructed to meet seismic forces described in this section: 1. Switchboards, Distribution Panelboards, 2. Emergency Feeders 3. Cable tray, Busway, Ductbank 4. Disconnect Switches 5. Automatic/Manual Transfer Switches 6. Interior Luminaires 7. Emergency Luminaires and Exit Signs 8. Emergency Power Supply 9. Engine Generator Systems 10. Fire Alarm Panel, Initiating and Notification Appliances 2.4 MATERIALS A. Use the following materials for restraints: 1. Indoor Dry Locations: Steel, zinc plated. 2. Outdoors and Damp Locations: Galvanized steel. 3. Corrosive Locations: Stainless steel. 2.5 ANCHORAGE AND STRUCTURAL ATTACHMENT COMPONENTS A. Strength: Defined in reports by ICC Evaluation Service or another agency acceptable to authorities having jurisdiction. 1. Structural Safety Factor: Strength in tension and shear of components used shall be at least two times the maximum seismic forces to which they will be subjected. 875 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 48 - 5 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS B. Concrete and Masonry Anchor Bolts and Studs: Steel-expansion wedge type. Comply with IBC, ACI and ICC ES requirements for cracked concrete anchors. C. Concrete Inserts: Steel-channel type. D. Through Bolts: Structural type, hex head, high strength. Comply with ASTM F3125, Grade A 325. E. Welding Lugs: Comply with MSS SP-69, Type 57. F. Beam Clamps for Steel Beams and Joists: Double sided. Single-sided type is not acceptable. G. Bushings for Floor-Mounted Equipment Anchors: Neoprene units designed for seismically rated rigid equipment mountings, and matched to the type and size of anchor bolts and studs used. H. Bushing Assemblies for Wall-Mounted Equipment Anchorage: Assemblies of neoprene elements and steel sleeves designed for seismically rated rigid equipment mountings, and matched to the type and size of attachment devices used. 2.6 SEISMIC BRACING COMPONENTS A. Slotted Steel Channel: 1-5/8-by-1-5/8-inch cross section, formed from 0.1046-inch- thick steel, with 9/16-by-7/8-inch slots at a maximum of 2 inches o.c. in webs, and flange edges turned toward web. 1. Materials for Channel: ASTM A 1011, GR 33. 2. Materials for Fittings and Accessories: ASTM A 635, ASTM A 576, or ASTM A 36. 3. Fittings and Accessories: Products of the same manufacturer as channels and designed for use with that product. 4. Finish: Baked, rust-inhibiting, acrylic-enamel paint applied after cleaning and phosphate treatment, unless otherwise indicated. B. Channel-Type Bracing Assemblies: Slotted steel channel, with adjustable hinged steel brackets and bolts. C. Cable-Type Bracing Assemblies: Zinc-coated, high-strength steel wire rope cable attached to steel thimbles, brackets, and bolts designed for cable service. 1. Arrange units for attachment to the braced component at one end and to the structure at the other end. 2. Wire Rope Cable: Comply with ASTM A 603. Use 49- or 133-strand cable with a minimum strength of 2 times the calculated maximum seismic force to be resisted. D. Hanger Rod Stiffeners: Slotted steel channels with internally bolted connections to hanger rod. 876 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 48 - 6 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS PART 3 - EXECUTION 3.1 INSTALLATION A. Refer to the applicable code sections and Authority Having Jurisdiction for the exact seismic restraint requirements of conduit, equipment, etc. B. Layout of transverse and longitudinal bracing shall follow recommendations of approved design standards listed in Part 1 of this specification section. C. All rigid floor mounted equipment shall have a resilient media between the equipment mounting hole and the anchor bolt in concrete. D. All seismic restraint systems shall be installed in strict accordance with the manufacturer's written instructions and all certified submittal data. E. Installation of seismic restraints shall not cause any change in position of equipment lighting or conduits resulting in stresses or misalignment. F. No rigid connections between equipment and the building structure shall be made that degrade the noise and vibration-isolation system specified. G. Do not install any equipment or conduit that makes rigid connections with the building unless isolation is not specified. H. Coordinate work with all other trades to avoid rigid contact with the building. Any conflicts with other trades that will result in rigid contact with equipment or conduit due to inadequate space or other unforeseen conditions shall be brought to the Architect/Engineer's attention prior to specific equipment selection. I. Prior to installation, bring to the Architect/Engineer's attention any discrepancies between the specifications and the field conditions, or changes required due to specific equipment selection. J. Bracing may occur from flanges of structural beams, upper truss cords of bar joists, cast in place inserts, or International Code Council approved seismic anchors for installation in concrete. K. Cable restraints shall be installed slightly slack to avoid short-circuiting the isolated suspended equipment or conduit. L. Cable assemblies shall be installed taut on non-isolated systems. Solid braces may be used in place of cables on rigidly attached systems only. M. Do not install cables over sharp corners. N. Brace support rods when necessary to accept compressive loads. Welding of compression braces to the vertical support rods is not acceptable. O. Provide reinforced clevis bolts when required. 877 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 48 - 7 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS P. The vibration isolation manufacturer shall furnish integral structural steel bases as required. Independent steel rails are not acceptable. Q. Post-Installed anchors shall be provided to meet seismic requirements. R. Vertical conduit risers flexibly supported to accommodate thermal motion and/or conduit vibration shall be guided to maintain conduit stability and provide horizontal seismic restraint. S. Seismic restraints shall be mechanically attached to the system. Looping restraints around the system is not acceptable. T. Do not brace a system to two different structures such as a wall and a ceiling. U. Provide appropriately sized openings in walls, floors, and ceilings for anticipated seismic movement. Provide fire seal systems in fire-rated walls. V. Positively attach all roof-mounted equipment to roof curbs. Positively attach all roof curbs to building structure. W. Exposed seismic supports in occupied areas shall be guarded or covered to protect occupants. 3.2 SEISMIC RESTRAINT EXCLUSIONS A. Refer to the applicable code sections and Authority Having Jurisdiction for allowable exclusions. END OF SECTION 26 05 48 878 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 1 ELECTRICAL IDENTIFICATION SECTION 26 05 53 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. Adhesive Markings and Field Labels B. Nameplates and Signs C. Product Colors 1.2 REFERENCES A. NFPA 70E - National Electrical Safety Code B. NFPA 70 - National Electrical Code (NEC) C. CEC California Electrical Code D. ANSI A13.1 - Standard for Pipe Identification E. ANSI Z535.4 - Standard for Product Safety Signs and Labels 1.3 SUBMITTALS A. General: Submit the following in accordance with Division 1 Specification Sections and under provisions of Section 26 05 00. 1. Product Data for each type of product specified. 2. Schedule of nomenclature to be used for identification signs and labels for each piece of equipment including, but not limited to, the following equipment types as specified in Division 26. 3. Samples of each color, lettering style and other graphic representation required for identification materials including samples of labels and signs. 4. Identification required in this section shall apply to equipment furnished in Division 26 and any other applicable Divisions including Division 21/22/23. PART 2 - PRODUCTS 2.1 ADHESIVE MARKINGS AND FIELD LABELS A. Text Sizes: 1. The following information shall be used for text heights, fonts, and size, unless otherwise noted. 879 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 2 ELECTRICAL IDENTIFICATION a. Font: Normal 721 Swiss Bold b. Adhesive Labels: 3/16 inch minimum text height c. Vinyl / Plastic Laminate Labels: 3/4" inch minimum text height 2.2 NAMEPLATES AND SIGNS A. Engraved, Plastic-Laminated Labels, Signs and Instruction Plates: Engraving stock melamine plastic laminate, 1/16-inch minimum thick for signs up to 20 square inches, or 8 inches in length; 1/8 inch thick for larger sizes. Labels shall be punched for mechanical fasteners. B. Text Sizes: 1. The following information shall be used for text heights, fonts, and size, unless otherwise noted. a. Text Height: 3/8 inch minimum C. Safety Signs: Comply with 29 CFR, Chapter XVII, Part 1910.145. D. Fasteners for Plastic-Laminated Signs; Self-tapping stainless steel screws or number 10/32 stainless steel machine screws with nuts and flat and lock washers. 2.3 PRODUCT COLORS A. Adhesive Markings and Field Labels: 1. All Labels: Black letters on white face 2. Normal Power and General Labels: 3. Control Labels: 4. Emergency: B. Nameplates and Signs: 1. NORMAL POWER: Black letters on white face 2. Control Labels: Black letters on white face 3. EMERGENCY: White letters on red face PART 3 - EXECUTION 3.1 INSTALLATION A. Lettering and Graphics: Coordinate names, abbreviations, colors, and other designations used in electrical identification work with corresponding designations specified or indicated. Install numbers, lettering, and colors as approved in submittals and as required by code. 880 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 3 ELECTRICAL IDENTIFICATION B. Exposed Ceilings and Finished Spaces: The project includes exposed ceilings in finished spaces. The installation of colored raceways and labeling may not be aesthetically desirable in finished spaces. The contractor shall coordinate identification requirements in exposed ceilings of finished spaces with the A/E prior to installation and ordering of materials. C. Electrical System Color Chart: This Contractor shall furnish and install framed 8" x 12" charts of the color-coded identification scheme used for the electrical system in all electrical rooms and next to the main fire alarm panel. D. Install identification devices in accordance with manufacturer's written instruction and requirements of Electrical Code. E. Sequence of Work: Where identification is to be applied to surfaces that require finish, install identification after completion of finish work. All mounting surfaces shall be cleaned and degreased prior to identification installation. F. Circuit Identification: Tag or label conductors as follows: 1. Multiple Power or Lighting Circuits in Same Enclosure: Where multiple branch circuits are terminated or spliced in a box or enclosure, label each conductor with source and circuit number. 2. Multiple Control Wiring and Communication/Signal Circuits in Same Enclosure: For control and communications/signal wiring, use wire/cable marking tape at terminations in wiring boxes, troughs, and control cabinets. Use consistent letter/number conductor designations throughout on wire/cable marking tape. 3. Match identification markings with designations used in panelboards shop drawings, Contract Documents, and similar previously established identification schemes for the facility's electrical installations. G. Apply warning, caution and instruction signs as follows: 1. Install warning, caution or instruction signs where required by Electrical Code, where indicated, or where reasonably required to assure safe operation and maintenance of electrical systems and of the items to which they connect. Install engraved plastic-laminated instruction signs with approved legend where instructions or explanations are needed for system or equipment operation. Install metal-backed butyrate signs for outdoor items. 2. Emergency Operating Signs: Install, where required by Electrical Code, where indicated, or where reasonably required to assure safe operation and maintenance of electrical systems and of the items to which they connect, engraved laminate signs with white legend on red background with minimum 3/8- inch high lettering for emergency instructions on power transfer, or other emergency operations. H. Apply circuit/control/item designation labels of engraved plastic laminate for pushbuttons, pilot lights, alarm/signal components, and similar items, except where labeling is specified elsewhere. I. Install labels parallel to equipment lines at locations as required and at locations for best convenience of viewing without interference with operation and maintenance of equipment. 881 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 4 ELECTRICAL IDENTIFICATION J. Install ARC FLASH WARNING signs on all power distribution equipment per Section 26 05 73. K. Install ARC FLASH WARNING signs on all switchboards, panelboards, industrial control panels, and motor control centers. 1. Sample Label: ! WARNING ARC FLASH AND SHOCK HAZARD APPROPRIATE PPE REQUIRED FAILURE TO COMPLY CAN RESULT IN DEATH OR INJURY REFER TO NFPA 70E L. Circuits with more than 600V: Identify raceway and cable with "DANGER-HIGH VOLTAGE" in black letters 2 (50mm) inches high on orange background at 10'-0 foot intervals. 1. Entire floor area directly above conduits running beneath and within 12 inches of a basement or ground floor that is in contact with earth or is framed above unexcavated space. 2. Wall surfaces directly external to conduits concealed within wall. 3. All accessible surfaces of concrete envelope around conduits in vertical shafts, exposed in building, or concealed above suspended ceilings. M. Selective Coordination Label: Install caution signs on all switchboards, distribution panels, panelboards, disconnects, and other equipment with selectively coordinated overcurrent protection devices. Sign at a minimum shall contain: 1. CAUTION: OVERCURRENT DEVICES IN THIS ENCLOSURE ARE SELECTIVELY COORDINATED. EQUIVALENT REPLACEMENTS AND TRIP SETTINGS ARE REQUIRED. N. Underground Electrical Lines: For exterior underground power, control, signal, and communication lines, install continuous underground plastic line marker located directly above line at 6 (150mm) to 8 (205mm) inches below grade. A single plastic line marker is permitted when the width of the common trench does not exceed 16 inches; provide a second plastic line marker to mark each edge of the trench when 16 inches of width is exceeded. Install line marker for underground wiring, both direct-buried cables and cables in raceway. 3.2 BOX LABELING A. Products: 1. Adhesive labels and field markings B. Identify Junction, Pull and Connection Boxes: Labeling shall be 3/8-inch Kroy tape OR Brother self-laminating vinyl label, letters/numbers color coded same as conduits. In rooms that are painted out, provide labeling on inside of cover. C. All junction, pull, and connection boxes shall be identified as follows: 882 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 5 ELECTRICAL IDENTIFICATION 1. For power and lighting circuits, indicate system voltage and identity of contained circuits ("120V, 1LA1-3,5,7"). 2. Essential Electrical System EES: When applicable the label shall include "Essential Electrical System EES". Maximum interval between label intervals shall be 25 feet or as required by code. 3. For other wiring, indicate system type and description of wiring ("FIRE ALARM NAC #1"). 3.3 EQUIPMENT CONNECTION IDENTIFICATION A. Products: 1. Nameplates and signs B. Provide identification for hard wired electrical connections to equipment such as disconnects switches, starters, etc. Plug and cord type connections do not require this specific label. C. Identification shall be provided for all connections to equipment furnished by this Contractor, other contractors, or the Owner. The following list of equipment is specifically being listed to receive an equipment connection label; this list does not limit the equipment that shall receive a label: 1. Mechanical heating, ventilation, and air conditioning equipment; , pumps, air handing ventilation units, condensing units, unit heaters, and similar equipment 2. Plumbing equipment 3. Fire protection equipment 4. Elevator D. Labeling shall include: 1. Equipment type and contract documents designation of equipment being served 2. Location of equipment being served if it is not located within sight. 3. Voltage and rating of the equipment. 4. Panel and circuit numbers(s) serving the equipment 5. Available fault current; refer to one-line diagram or panel schedule of panel serving equipment. 6. Date of fault current study; refer to one-line diagram 7. Sample Label: UNIT HEATER UH-1 ("LOCATED IN STORAGE ROOM 200") 480V: 3-PHASE FED FROM "1HA1-1" 22,000 AMPS AVAILABLE FAULT CURRENT DATE OF STUDY: 1 JAN 2017 3.4 POWER DISTRIBUTION EQUIPMENT IDENTIFICATION A. Products: 1. Nameplates and signs 883 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 6 ELECTRICAL IDENTIFICATION B. Provide identification on the front of all power distribution equipment such as panelboards, switchboards, switchgear,, generators,, storage battery disconnects, transfer switches, etc. Labels shall be visible on the exterior of the gear, correspond to the one-line diagram nomenclature, and identify each cubicle of multi-section gear. 1. Interior Equipment: The identification material shall be engraved plastic- laminated labels. 2. Exterior Equipment: The identification material shall be engraved vinyl labels. 3. Labeling shall include: a. Essential Electrical System EES: When applicable the label shall include "Essential Electrical System EES". Applicable equipment includes components of the life safety and critical branch for healthcare facilities (generators, transfer switches, switchboards, distribution panels, panelboards, etc.). b. Equipment type and contract documents designation of equipment. c. Voltage of the equipment. d. Name of the upstream equipment and location of the upstream equipment if it is not located within sight. e. Rating and type of the overcurrent protection device serving the equipment if it is not located within sight ("FED BY 400A/3P BREAKER"). f. Sample Label: DISTRIBUTION PANEL DP-H1 480Y/277V FED FROM SWITCHBOARD "SB-1" (LOCATED IN MAIN ELEC ROOM) 4. Provide the following on a separate label, installed below the label above: a. Available fault current; refer to one-line diagram or panel schedules b. Date of fault current study; refer to one-line diagram c. Sample Label: 22,000 AMPS AVAILABLE FAULT CURRENT DATE OF STUDY: 1 JAN 2017 C. Service Equipment Label: A separate nameplate for the service entrance equipment and include: 1. Nominal system voltage, service wire size, quantity, material, distance 2. Maximum available fault current; refer to one-line diagram for values 3. Clearing time of overcurrent protection devices based on available fault current. Refer to calculations and report from Section 26 05 73 for value. 4. Date of fault current study; refer to one-line diagram 5. Date of label 6. Sample Label: 480Y/277V, 6 SETS 4#750KCM CU, 75FT 39,800 AMPS AVAILABLE FAULT CURRENT 0.07 SECOND CLEARING TIME DATE OF STUDY: 1 JAN 2017 DATE OF LABEL: 4 JUL 2017 884 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 7 ELECTRICAL IDENTIFICATION D. Arc Energy Reduction Label: 1. Provide a separate engraved plastic laminate label centered at the top of each vertical section of the electrical gear indicating the following when applicable. a. Label: "This equipment is designed with a system listed below". b. Applicable Systems: 1) Zone-selective interlocking system for selective coordination and arc energy reduction 2) Differential relaying system for selective coordination and arc energy reduction 3) Arc energy reducing maintenance switch 4) Energy reducing active arc flash mitigation system E. Adjustable-Trip Over Current Protection Label: 1. Provide a separate engraved plastic laminate label adjacent to each overcurrent projection device with adjustable trip settings. Provide label separate from load identification label. a. Label: 1) Long-time delay: 2) Long-time pickup: 3) Short-time delay: 4) Short-time pickup: 5) Instantaneous: 6) Ground fault delay: 7) Ground fault: b. Sample Label: Long-time delay: 10.0 Long-time pickup: 1.0 Short-time delay: 0.15 Short-time pickup: 5.0 Instantaneous: 2.0 Ground fault delay: 0.25 Ground fault: 50.0 F. Nominal System Voltage Label: 1. Where more than one nominal voltage system exists in a building or facility, the identification of color coding used in the panelboard or equipment shall be permanently posted on the interior of the door or cover. 885 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 53 - 8 ELECTRICAL IDENTIFICATION G. Distribution panelboards and switchboards shall have each overcurrent protection device identified with name and location of the load being served ("AHU-1 LOCATED IN PENTHOUSE 1"). Provide a separate engraved plastic laminate label adjacent to each overcurrent projection device with feeder wire size, feeder wire quantity, conductor material and distance in feet. Provide label separate from load identification label and adjustable trip settings label. 1. Sample Labels for Feeders: 4#3/0 CU & 1#6 CU GND, 125FT 4#250KCM AL & 1#6 GND CU, 125FT 2 SETS 4#400KCM CU & 1#1 GND CU, 125FT 3.5 ELECTRICAL WORKING CLEARANCE IDENTIFICATION A. Products: 1. Safety Yellow paint and custom stencils B. Provide custom identification of electrical equipment working clearances in mechanical, electrical, storage, janitorial, and similar non-public areas. 3.6 SERIES RATING IDENTIFICATION A. Products: 1. Nameplates and signs B. Upstream devices of series rated components not enclosed in a single NEMA type enclosure shall be identified with a nameplate reading "CAUTION - SERIES RATED SYSTEM - IDENTICAL COMPONENT REPLACEMENT REQUIRED". C. Downstream devices of series rated components not enclosed in a single NEMA type enclosure shall be identified with a nameplate reading "CAUTION - SERIES RATED SYSTEM - ADDITIONAL SERIES COMBINATION RATING: XX,XXX RMS SYMMETRICAL AMPERES" where XX,XXX shall be the series combination rating. END OF SECTION 26 05 53 886 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 73 - 1 POWER SYSTEM STUDY SECTION 26 05 73 - POWER SYSTEM STUDY PART 1 - GENERAL 1.1 SECTION INCLUDES A. Low voltage distribution system power study. B. Short-circuit analysis and report. C. Selective coordination analysis and report. D. Arc-flash hazard analysis and report. 1.2 RELATED SECTIONS A. Section 26 05 00 - Basic Electrical Requirements B. Section 26 24 16 - Panelboards C. Section 26 32 13 - Packaged Engine Generator Systems D. Section 26 36 00 - Transfer Switch 1.3 QUALITY ASSURANCE A. Analyses shall be performed by an agent authorized by the manufacturer of equipment specified in the related specification sections. 1.4 SUBMITTALS A. Documentation shall bear the seal/signature of the licensed Professional Engineer who performed the analysis. B. The input for the power system study shall be based on the contract documents, with estimated conductor lengths and field investigation of existing equipment types, sizes, ratings provided by the Electrical Contractor. IMEG will provide a preliminary Power Tools for Windows project file for information, if requested. C. Documentation of the analyses shall be submitted in a single bound electronic (PDF or equal) format and shall accompany the shop drawing submittals for equipment provided under the related work specification sections. The submittal of these related specification sections will not be reviewed without this documentation. Submit a sample arc-flash hazard label for Owner review and approval prior to printing. 1.5 REFERENCES A. NFPA 70 - National Electrical Code (NEC) B. CEC California Electrical Code C. NFPA 70E - Standard for Electrical Safety in the Workplace 887 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 73 - 2 POWER SYSTEM STUDY D. IEEE 1584 - IEEE Guide for Performing Arc-Flash Hazard Calculations, latest version E. ANSI Z535.4 - Products Safety Signs and Labels 1.6 SCOPE A. Provide a power system study of the electrical system shown on the plans. The study shall include arc-fault analysis, selective coordination analysis and arc flash hazard analysis. B. Contractor is required to provide a fully coordinated system for the normal emergency electrical system or emergency electrical system and the associated normal side of each transfer switch and all other locations indicated on the one line diagram. Contractor shall provide overcurrent protective devices with the appropriate models, frame sizes, trip units, etc. as required to provide a selectively coordinated system. PART 2 - PRODUCTS 2.1 Power systems study shall be completed in Power Tools for Windows (PTW) 8.0 or later version or pre-approved equivalent program. PART 3 - EXECUTION 3.1 SHORT-CIRCUIT ANALYSIS A. Provide a complete short-circuit analysis from the utility service to and including the entire building distribution as shown on the drawings. B. Analysis shall include the entire distribution system from the point of connection to the utility power source to the distribution panels and branch circuit panelboards. C. Short-circuit analysis documentation shall be made in one-line diagram form showing the magnitude and location of each calculated fault. Fault current calculations shall be made at the main bus of each switchboard, distribution panel, and branch circuit panel. A summary of the fault currents available shall also be submitted and made available to the AHJ if requested. 3.2 SELECTIVE COORDINATION ANALYSIS A. Provide a complete selective coordination analysis comparing time/current curves of the protective devices to be installed to assure coordination between main and downstream devices. Overcurrent protection devices shall be coordinated based on the maximum available fault current results of the short-circuit analysis report. B. Provide a complete selective coordination analysis, comparing time/current curves of the protective devices to be installed to assure complete selectivity between main and downstream devices for code-required branches and branches identified on one-line drawings. Overcurrent protective devices serving the normal shall selectively coordinate for the period of time that a fault's duration extends beyond0.1 second. 888 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 73 - 3 POWER SYSTEM STUDY C. Provide trip settings for all (selectively coordinated and non-selectively coordinated) adjustable trip over current protection devices including long time delay, long time pickup, short time delay, short time pickup, instantaneous and ground fault. Selectively coordinated branches shall be based on the selective coordination study results. Non- selective coordinated branches shall be based on the design trip ratings. Provide selective coordination between all ground fault trip settings. D. The analysis shall include primary protective device, secondary main switchboard device(s), switchboard branch feeder devices, generator breaker, distribution panel, panelboard main devices, and branch feeder devices. E. The coordination plots provided shall indicate graphically the coordination proposed for the system on full-size log forms and shall define the types of protective devices selected, together with proposed time dial and pickup settings required. The plots shall include titles, representative one-line diagrams, legend, complete parameters for transformer(s), and complete operating bands for circuit breaker trip devices, fuses, etc. 1. The long-time region of the coordination plots shall designate the pickups required for the circuit breakers. 2. The short-time region shall indicate the magnetizing in-rush and ASA-withstand- transformer parameter, the circuit breaker, short-time and instantaneous trip devices, fuse-manufacturing tolerance bands, significant symmetrical fault currents, etc. 3. Each primary protective device required for the transformer shall be selected so the characteristics or operating band is within the transformer parameters, which shall include a parameter equivalent to 58% of the withstand point to afford protection for secondary line-to-ground faults. The transformer damage curve shall be included for the transformer when the selected protective device is not within the associated parameters. 4. Molded case circuit breakers shall be separated from each other and the associated primary protective device by a 16% current margin for coordination and protection in the event of secondary line-to-line faults. 5. Include zone selective interlocking, differential relaying, and other selective coordination technology in the study when required by other specification sections. 6. The protective device characteristics or operating bands shall be suitably indicated to reflect the actual symmetrical fault currents sensed by the device. 7. The drawings and specifications indicate the general requirements for motors, motor-starting equipment, and medium-voltage and low-voltage equipment, but additional specific requirements of equipment furnished shall be determined in accordance with the results of the coordination study. a. The study shall include verification of equipment ratings and settings. The Contractor shall keep the study up-to-date with any project changes which affect the study and submit the revised study for review. A final electronic copy shall be submitted with the record drawings. F. Provide summary table of adjustable overcurrent protective devices settings for the operating and maintenance manual. 889 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 73 - 4 POWER SYSTEM STUDY 3.3 ARC FLASH HAZARD ANALYSIS A. The arc flash hazard analysis shall be performed according to the IEEE 1584 equations that are presented in NFPA70E. B. The flash protection boundary and the incident energy shall be calculated at all significant locations in the electrical distribution system (switchboards, switchgear, unit substations, motor-control centers, panelboards, busway, and splitters) where work could be performed on energized parts. C. Safe working distances shall be based on the calculated arc flash boundary considering an incident energy of 1.2 cal/cm2. D. When appropriate, the short circuit calculations and the clearing times of the phase overcurrent devices will be retrieved from the short-circuit analysis and coordination study models. Ground overcurrent relays should not be taken into consideration when determining the clearing time when performing incident energy calculations E. The short-circuit calculations and the corresponding incident energy calculations for multiple system scenarios must be compared, and the greatest incident energy must be uniquely reported for each equipment location. Calculations must be performed to represent the maximum and minimum contributions of fault current magnitude for all normal and emergency operating conditions. The minimum calculation will assume that the utility contribution is at a minimum and will assume a minimum motor contribution (all motors off). Conversely, the maximum calculation will assume a maximum contribution from the utility and will assume the maximum amount of motors to be operating. Calculations shall take into consideration the parallel operation of synchronous generators with the electric utility, where applicable. F. The incident energy calculations must consider the accumulation of energy over time when performing arc flash calculations on buses with multiple sources. Iterative calculations must take into account the changing current contributions, as the sources are interrupted or decremented with time. Fault contribution from motors and generators should be decremented as follows: 1. Fault contribution from induction motors should not be considered beyond 3 to 5 cycles. 2. Fault contribution from synchronous motors and generators should be decayed to match the actual decrement of each as closely as possible (e.g., contributions from permanent magnet generators will typically decay from 10 per unit to 3 per unit after 10 cycles). G. For each equipment location with a separately enclosed main device (where there is adequate separation between the line side terminals of the main protective device and the work location), calculations for incident energy and flash protection boundary shall include both the line and load side of the main breaker. H. Include Arc Energy Reduction (AER) analysis in the study when required by other specification sections. I. When performing incident energy calculations on the line side of a main breaker (as required per the above), the line side and load side contributions must be included in the fault calculation. 890 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 05 73 - 5 POWER SYSTEM STUDY J. Miscoordination should be checked among all devices within the branch containing the immediate protective device upstream of the calculation location, and the calculation should utilize the fastest device to compute the incident energy for the corresponding location. K. Where it is not physically possible to move outside the flash protection boundary in less than 2 seconds during an arc flash event, a maximum clearing time based on the specific location shall be utilized. L. Create and install NFPA 70E compliant labels describing the arc flash hazard level at all switchboards, panelboards, and other locations in the electrical distribution system where work could be performed on energized parts. M. Labels shall be vinyl or laminated, with a self-adhesive backing, conform with ANSI Z535.4 Products Safety Signs and Labels standard, and include the following: 1. Arc flash boundary 2. Available incident energy calculated in the analysis and the corresponding working distance, or the arc flash personal protective equipment (PPE category) for the equipment, but not both. N. Examples showing the minimum required information follow: O. A list of all hazard categories and the corresponding PPE requirements shall be posted in the main electric room, engineering office, or other location. The list shall be plastic laminate or typewritten and housed in a plastic frame. 3.4 ADJUSTMENTS A. Manufacturer's authorized representative or Contractor shall set all adjustable protective devices to values indicated in the approved coordination study. Apply settings prior to placing equipment into operation. When the scope of work or execution includes remodel or phases construction, the contractor shall adjust applicable settings as required prior to each system component placed in operation. B. Wherever the arc flash incident energy exceeds Arc Flash Category 2 (i.e. greater than 8 cal/cm^2), provide options for adjusting breaker trip times, if possible, to reduce energies to Category 2 or below. 3.5 TRAINING A. Provide four hours of Owner training to explain the implications of arc-flash requirements and work permit procedure. END OF SECTION 26 05 73 891 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 16 - 1 ELECTRICAL CONTROLS AND RELAYS SECTION 26 09 16 ELECTRICAL CONTROLS AND RELAYS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Relays and Timers B. Pushbutton Operators PART 2 - PRODUCTS 2.1 TIME RELAYS A. ; Time relays: shall be rated and shall be electric type incorporating mode of on delay off delay interval one shot repeat cycle off impulse. Time period shall be adjustable. B. Time relays shall be mounted in NEMA 1 enclosures in control terminal cabinet. C. Manufacturers: 1. Square D Class 9050 Type RE7 2. Eaton 3. ABB 4. Siemens 2.2 EMERGENCY POWER OFF (EPO) A. Mushroom head, (1) N.O. (1) N.C. contacts, 120 volt, turn to release, provide engraved nameplate. Provide guarded enclosure cover to protect from accidental operation. Parallel wire all EPO in suite when applicable. 1. Provide engraved nameplate: emergency off. 2. Manufacturers: a. Square D 9001 XB5AS8445- KYG1Y b. Eaton c. ABB d. Siemens 52PA2W2A 2.3 MOMENTARY PUSHBUTTON (PB) A. Non-illuminated, round 1-3/8" diameter mushroom button, (1) normally open, (1) normally closed contact. Contacts rated 10 amps continuous. Provide 2-1/4" square engraved nameplate with white background and black letters. Nameplate to read "EMERGENCY POWER OFF". 892 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 16 - 2 ELECTRICAL CONTROLS AND RELAYS PART 3 - EXECUTION 3.1 INSTALLATION A. Coordinate with Mechanical Division 23 in connection of control conduit into control terminal. B. Install line voltage thermostats for single phase motors. END OF SECTION 26 09 16 893 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 1 LIGHTING CONTROL SYSTEMS SECTION 26 09 33 LIGHTING CONTROL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Line and low voltage standalone lighting controls B. Automatic load control relay (ALCR20) C. Branch circuit emergency lighting transfer switch (BCELTS) D. Distributed lighting control 1.2 RELATED SECTIONS A. The lighting system design includes a combination of luminaire sources, lighting control components, programming sequences, and supplementary components for building and energy code compliance. The design uses performance-based specifications for portions of the lighting system to account for the limitation of comparable product solutions available by competitive manufacturers. The Contractor shall reference related specification sections, plans, schedules, and details prior to submitting pricing, submittals, and installation. The Contractor shall coordinate system component compatibility among various manufacturers and suppliers for a turnkey lighting system. Referenced sections include, but are not limited to, the following: 1. 26 51 19 LED Lighting 2. Electrical Drawings: Plans, luminaire schedules, lighting control sequence of operations, diagrams, and details. 1.3 RELATED WORK A. Section 01 91 00 - Commissioning B. Section 23 09 00 - Facility Management Control System (FMCS) C. Section 26 51 00 - Lighting D. Section 27 41 00 - Audio/Visual System 1.4 QUALITY ASSURANCE A. Manufacturers shall be regularly engaged in the manufacture of lighting control equipment and ancillary equipment, of types and capacities required, whose products have been in satisfactory use in similar service for not less than five (5) years. B. All components and assemblies are to be factory pre-tested prior to delivery and installation. 894 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 2 LIGHTING CONTROL SYSTEMS C. Comply with Electrical Code as applicable to electrical wiring work. D. Comply with applicable portions of NEMA standards pertaining to types of electrical equipment and enclosures. E. Panels and accessory devices are to be UL listed under UL 916 Energy Management Equipment. Panels and accessories used for control of life safety and critical branch circuits shall be listed under UL 924 Emergency Lighting and Power Equipment. F. All assemblies are to be in compliance with FCC emissions standards specified in Part 15 Subpart J for Class A applications. 1.5 REFERENCES A. FCC Rules and Regulations, Part 15, Subpart J - Radio Frequency Interference B. FS W S 896 Switch, Toggle C. California Energy Code - Building Energy Efficiency Standards Title 24 D. NEMA WD 1 - General Color Requirements for Wiring Devices E. NEMA WD 7 - Occupancy Motion Sensors F. NFPA 70 - National Electrical Code (NEC) G. CEC California Electrical Code H. UL Standard 916 Energy Management Equipment I. UL 924 - Emergency Lighting and Power Equipment J. UL 1472 - Solid-State Dimming Controls 1.6 SUBMITTALS A. Submit product data under provisions of Section 26 05 00. B. Submit a comprehensive package including devices, hardware, software, product specification, finishes, dimensions, installation instructions, warranty, system software requirements, and roles and responsibilities of all persons and groups involved in installation, execution, and commissioning. C. Provide floor plan showing location, orientation, and coverage area of each control device, sensor, and controller/interface. For areas requiring multiple sensor devices for appropriate coverage, submit specific manufacturer-approved sensor layout as an overlay directly on the project drawings, either in print or approved electronic form. D. Submit a list of devices and equipment that will be installed for each sequence of operation. 895 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 3 LIGHTING CONTROL SYSTEMS E. Submit project specific control wiring diagrams showing all equipment, line voltage, and control wiring requirements for all components including, but not limited to, dimmers, relays, low voltage switches, occupancy sensors, control stations, and communication interfaces and programming instructions for each sequence of operation. Include network cable specification and end-of-line termination details, if required. F. Project specific network riser diagram including floor and building level details. Illustrate points of connection to integrated systems. Coordinate integration with mechanical and/or other trades. 1.7 PROJECT RECORD DOCUMENTS A. Submit project record documents under provisions of Section 26 05 00. B. Accurately record location of all controls and devices. Include description of switching sequences and circuiting arrangements. 1.8 OPERATION AND MAINTENANCE DATA A. Submit emergency, operation, and maintenance data under provisions of Section 26 05 00. Data shall also include the following: 1. Schedule for routine maintenance, inspection, and calibration of all lighting control devices and system components. Recommended schedule for inspection and recalibration of sensors. 2. Complete narrative describing intended operation and sequence for each control scenario and system component, updated to reflect all changes resulting from commissioning of systems. Narrative shall indicate recommended settings for devices where applicable. 3. Replacement part numbers for all system components. B. Identify installed location and labeling for each luminaire controlled by automated lighting controls. C. Submit software operating and maintenance manuals, program software backup on compact disc or compatible media with data files, device address list, and a printout of software application and graphic screens, where applicable. 1.9 SYSTEM DESCRIPTION A. Performance Statement: This specification section and the accompanying lighting design documents describe the minimum material quality, required features, and operational requirements of the lighting control system (LCS). These documents do not convey every wire that must be installed and every equipment connection that must be made. Based on the performance required of the system, as presented in these documents, the Contractor and system manufacturer/vendor are solely responsible for determining all equipment, wiring, and programming required for a complete and operational system. 896 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 4 LIGHTING CONTROL SYSTEMS B. Provide an integrated lighting controls system consisting of panels, power supplies, controllers, sensors, relays, switches, devices, wiring, etc. necessary to perform the Lighting Control Sequence of Operation as defined on the plans and specifications. Contractor is responsible for confirming that all components and luminaires interoperate as a single system. 1. Sequence of Operation: Describes the required operation and performance for lighting control in each space. Sequences of operation are indicated on the drawings. 2. Drawings: The drawings include sequences of operation, locations of control interface devices, sensors, and control zones. Wiring and additional equipment to make a complete and functioning system has not been shown, but shall be submitted with the shop drawings. C. The following control types and features are acceptable. Acceptable control locations are shown on the drawings. 1. Line Voltage Control: Control equipment consists of traditional line voltage wiring devices and equipment such as switches, dimmers and combination occupancy/vacancy sensor switches, etc. 2. Distributed Control: Control equipment is in the space/zone being controlled; not reliant on centralized controllers. a. All locations shall have the ability to be networked for remote control and monitoring, but network connections are not required. 1.10 COMMISSIONING A. The Contractor shall provide all services necessary for compliance with the IECC Section C408 Commissioning. The commissioning shall include, but not be limited to, a commissioning plan, preliminary commissioning report, construction documents, manuals, final commissioning report, and lighting system functional testing. B. This project will have selected building systems commissioned. The Contractor is responsible to execute commissioning. The commissioning process, equipment, and systems to be commissioned are defined in Division 1. C. The Contractor shall notify the Architect/Engineer and Owner's Representative ten (10) working days prior to scheduled commissioning date. D. The commissioning process requires meeting attendance. Refer to Division 1 for meeting requirements. E. The system shall be functionally tested by a factory-authorized engineer and comply with the Sequence of Operation. All loads shall be tested live for continuity and freedom from defects, and all control wiring shall be tested for continuity and connections prior to energizing the system. 897 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 5 LIGHTING CONTROL SYSTEMS 1.11 WARRANTY A. Manufacturer shall warrant products under normal use and service to be free from defects in materials and workmanship for a period of two (2) years from date of commissioning. B. Occupancy, vacancy, daylight sensors and controls shall have a five (5) year warranty from date of Substantial Completion. PART 2 - PRODUCTS 2.1 LIGHTING CONTROLS A. All items of material having a similar function (e.g., switches, dimmers, sensors, contactors, relays, etc.) shall be of the same manufacturer, unless specifically stated otherwise on drawings or elsewhere in the specifications. Lighting control switches, systems, and components shall be listed. B. Color of lighting controls and sensors shall match the receptacle wiring devices specified in the space. C. The functions described in the lighting sequence of operation shall dictate the actual lighting control device required to accomplish the functions described for the space. 2.2 DEVICE COLOR A. All switch, lighting controls, and coverplate colors shall be the same as wiring devices, unless indicated otherwise. 2.3 COVERPLATES A. All switches and lighting controls shall be complete with coverplates that match material and color of the wiring device coverplates in the space. B. Where several devices are ganged together, the coverplate shall be of the ganged style for the number of devices used. C. Install nameplate identification as indicated in Section 26 05 53. D. Plate-securing screws shall be metal with head color matching the wall plate finish. 2.4 WALL SWITCHES A. Refer to Electrical Symbols List for device type. B. Switch touch surfaces shall have an antimicrobial additive that suppresses the growth of harmful bacteria, mold, mildew, and fungi. Coverplate color shall match the switch color. 1. Manufacturers: 898 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 6 LIGHTING CONTROL SYSTEMS a. Cooper 7621 CuVerro b. Leviton A5621 C. SW-1P; Single Pole Switch: 1. Single throw, 120/277-volt, 20-amp maintained contact. Toggle handle, side and back wired. 2. Manufacturers: a. Hubbell HBL1221 b. Leviton 1221-2 c. Pass & Seymour PS20AC1 d. Cooper AH1221 2.5 WALL DIMMERS A. SW-D-LED; LED Electronic Driver Dimmer: 1. Manufacturers: a. Compatible with provided LED driver. B. SW-D-LVE; Low Voltage Electronic Ballast Dimmer: 1. Manufacturers: a. Lutron NELV-450 b. Lightolier MP625QE C. SW-D3-LED; LED Electronic Driver Three-Way Dimmer: 1. Manufacturers: a. Compatible with provided LED driver. D. SW-OD; Wall 0-10V Dimmer / Occupancy sensor: 1. Manufacturers: a. Sensor Switch WSX D Series 2.6 LOCAL DAYLIGHTING CONTROLS A. Standalone Interior Photo Sensors: 1. SW-LS; Daylight Level Sensor - On/Off Control - One Zone: a. On/Off control. Range of 10-200 FC. Adjustable deadband prevents cycling. Adjustable time delay. 120/277 volt. b. Manufacturers: 1) Watt Stopper LS-102 899 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 7 LIGHTING CONTROL SYSTEMS 2) Sensor Switch CM-PC 3) Hubbell Automation DLCPC Series 4) Greengate PPS-4 2. Sensor shall detect changes in ambient light level and provide triggering of lighting groups in area based on sequence of operation. 3. Sensor shall provide on/off setpoints in quantity as specified on drawings and as shown in the sequence of operation. 4. Sensor shall be ceiling- or wall-mounted for range and viewing angle meeting application requirements as outlined in the sequence of operation. 5. Output signal from sensor shall be linear with light level. 2.7 INDOOR OCCUPANCY AND VACANCY SENSORS A. General Description: Wall- or ceiling-mounting, solid-state units with a separate power supply/relay unit. 1. Operation: Unless otherwise indicated, turn lights on when covered area is occupied and off when unoccupied, with a time delay for turning lights off, adjustable over a minimum range of 1 to 30 minutes. Vacancy sensors require a manual switch operation to turn lights on and off, with a time delay for turning lights off when unoccupied. 2. Sensor Output: Contacts rated to operate the connected relay, complying with UL 773A. Sensor shall be powered from the relay unit. 3. Relay Unit: Dry contacts rated for 20 A ballast load at 120 and 277 VAC, for 13- amp tungsten at 120 VAC, and for 1 hp at 120 VAC. Power supply to sensor shall be 24 V dc, 150-mA, Class 2 power source as defined by Electrical Code. 4. Mounting: a. Sensor: Suitable for mounting in any position on a standard outlet box. b. Relay: Externally mounted through a 1/2-inch knockout in a standard electrical enclosure. Mount relay above accessible ceiling near entry door to room or area. c. Time Delay and Sensitivity Adjustments: Recessed and concealed. 5. Indicator: LED to show when motion is being detected during testing and normal operation of the sensor. 6. Bypass Switch: Override the on function in case of sensor failure. 7. Power Supply and Child Packs: Provide as required for sensor quantity and switching scheme. Mount to standard 1/2" knockout on electrical box above accessible ceiling near entry door to room or area. Sensor power shall be from emergency circuit if emergency lighting is in the area. 8. Detection Coverage (Room): Detect occupancy anywhere in an area based on hand motion. 9. Detection Coverage (Corridor): Detect occupancy based on a half-step motion. 10. Warranty: Five (5) year warranty. B. Dual-Technology Type: Detect occupancy by using a combination of PIR and ultrasonic or acoustic detection methods in area of coverage. Particular technology or combination of technologies that controls on and off functions shall be selectable in the field by operating controls on unit. 900 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 8 LIGHTING CONTROL SYSTEMS 1. SW-VS-D or SW-OC-D; 360 Degree Coverage Pattern: a. Frequency greater than 40 KHz. Dual sensing verifications (requires both technologies to activate), either technology maintains on status. Integrated ambient light level sensor (2 to 200 FC range), adjustable sensitivity and time delay, integrated isolated relay contact. Sensor shall control all circuits in area, unless noted otherwise. Initial settings: ambient sensor 40 FC. b. Manufacturers: 1) Watt Stopper DT 300 Series 2) Hubbell OMNI-DT2000 or ATD2000C 3) Greengate OAC-DT 4) Leviton OSC##-MOW 5) Sensor Switch CM PDT 10 2. SW-VS-D-W or SW-OC-D-W; Wall Mounted on Adjustable Swivel Mount: a. Wall or ceiling sensor with adjustable settings to allow manual on/auto off or auto on/auto off. Integrated ambient light level sensor (2 to 100 FC range). b. Manufacturers: 1) Watt Stopper DT-200 Series 2) Hubbell LODTRP 3) Leviton OSM12--M series 4) Sensor Switch WvPDT 16 Series 3. SW-O; Wall Switch: a. Wall switch with manual on/auto off. 120/277 VAC load rating of 0-800 W for ballast, LED or tungsten. 5-, 15-, 30-minute adjustable OFF delay. Coverage of minor motion in 12' x 15' pattern. b. Manufacturers: 1) Watt Stopper DW-100 Series 2) Hubbell LHMTS, Leviton OSSMT series 3) Sensor Switch WSX-PDT SA Series 4. Sensitivity Adjustment: Separate for each sensing technology. 5. Detection Coverage: a. Task Areas: Detect occupancy anywhere in an area based on hand motion. b. Circulation Areas: Detect occupancy anywhere in an area based upon half- step walking motion. C. Mask sensors where necessary to prevent nuisance switching from adjacent areas. D. PIR Type: Detect occupancy by sensing a combination of heat and movement in area of coverage. 1. SW-O; Wall Switch Occupancy Sensor: 901 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 9 LIGHTING CONTROL SYSTEMS a. Passive infrared, zero crossing circuitry, integrated ambient light sensor (10 to 150 FC range), adjustable sensitivity and time delay, no minimum load requirements, manual or auto on operation, Initial settings: 10 minutes, ambient sensor 40 FC. Manual ON for vacancy sensing. b. Manufacturers: 1) Watt Stopper PW-100 Series 2) Sensor Switch WSX 3) Hubbell LHIRS1 or AP1277 4) Leviton ODS15 5) Greengate OSW-P-0451 2. SW-OC-P-P; Ceiling Mounted - 360 Degree Coverage Pattern: a. Passive infrared, zero crossing circuitry, integrated ambient light sensor (4 to 190 FC Range), adjustable sensitivity and time delay, integral isolated relay contact. Sensor shall control all circuits in the area unless noted otherwise. Initial settings: ambient sensor 40 FC. b. Manufacturers: 1) Watt Stopper CI Series 2) Sensor Switch CM-9 3) Hubbell Automation Omni-IR 4) Leviton OSC Series 5) Greengate OMR-P Series 3. SW-OC-P-P2; Ceiling Mounted - 100 Degree Coverage Pattern: a. Passive infrared, zero crossing circuitry, integrated ambient light sensor (4 to 190 FC Range), adjustable sensitivity and time delay, integral isolated relay contact. Sensor shall control all circuits in the area unless noted otherwise. Initial settings: ambient sensor 40 FC. b. Manufacturers: 1) Watt Stopper WPIR Series 2) Sensor Switch CM-9 3) Hubbell LOIRWV or ATD1600W 4. With daylight filter and lens to afford coverage applicable to space to be controlled. 2.8 DISTRIBUTED LIGHTING CONTROL A. Manufacturers: as listed below meet the qualifications as outlined in this specification. Contractor is responsible for verifying that selected manufacturer is capable of furnishing the complete system as specified herein. 1. Acuity Controls nLight Series 2. Legrand Watt Stopper DLM Series 902 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 10 LIGHTING CONTROL SYSTEMS 3. Hubbell Automation NX Series 4. Eaton Greengate RC3 Series (room-based system) 5. Lutron B. System Description: The lighting control system shall be a network of remote modules System includes all associated wiring, relay modules, photocells, switches, dimmers, time clock, occupancy sensors, network interfaces, and hubs. System shall utilize distributed relays modules, allowing these relay modules to be located above accessible ceilings in or adjacent to rooms they are controlling. C. Control Devices: All occupancy sensors (ultrasonic, IR and dual technology type), photocells, switches, and timers shall be provided with system and designed to operate on system network. Supplemental power packs shall be provided as required for multiple control devices. This equipment shall be identified in shop drawing submission. D. Relay Modules: Mounted in NEMA enclosure with physically separate 120/277-volt wiring compartment from low voltage control wiring. Provide low voltage digital communication to control devices as shown on drawings and schedules. Supplemental power packs shall be provided as required for multiple control devices. This equipment shall be identified in shop drawing submission. Dimmable relay modules shall be provided where indicated. Relay modules shall contain up to four (4) relays. Relay modules shall be labeled with room number that relays control lighting within. E. Single-Pole Relays: Mechanically held unless otherwise indicated; split-coil, momentary-pulsed type, rated 20 A, 125-volt AC for tungsten filaments and 20 A, 277- volt AC for electronic ballasts, 50,000 cycles at rated capacity. F. System server / central station shall provide programmable operation of lights connected via system relays and controlled with system devices. System software shall provide control of relays and control devices, time and sequence scheduling, timed out and blink light operation, and monitoring and reporting of system events and components. Initial programming shall be as shown on plans and schedules. G. Server / Central Control Station: Lighting control system manufacturer shall be responsible to assure coordination between relay modules, network hubs, and control system server/ central station such that system performs as described. Server shall be provided with monitor, keyboard, and mouse, and plugged into a receptacle connected to an equipment emergency circuit as a minimum. H. Network Hub: Network Hub shall contain processor and astronomic time clock for control and monitoring of lighting. Network hub shall be fed from an equipment emergency circuit at a minimum. 2.9 CONDUCTORS AND CABLES A. Control Wiring: 1. Where installed with the line-voltage wiring, control wiring shall be copper conductors not smaller than No. 16 AWG with insulation voltage rating and temperature rating equal to that of the line-voltage wiring, complying with Division 26 Section 26 05 13 "Wire and Cable." 903 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 11 LIGHTING CONTROL SYSTEMS 2. Tap conductors to switches or relays: Stranded copper conductors of 16 AWG or solid 16 or 18 AWG with insulation rating equal to that of the line-voltage wiring. 3. Tap conductors to dimming ballasts: Solid copper conductors of 18 AWG with insulation voltage rating equal to that of the line-voltage wiring and insulation temperature rating not less than 90°C. 4. Network cabling as required by manufacturer. B. Splices and Taps: 1. Tapping or wire trap connectors shall be used to splice all Class 1 and Class 2 control wiring. Twist-on, wire-nut type connectors are not allowed. PART 3 - EXECUTION 3.1 PRE-CONSTRUCTION MEETING A. Schedule a pre-construction meeting with the controls representative, installing contractor, Architect/Engineer, and Owner to explain the proposed lighting control centralized, wireless, and distributed systems. 3.2 EXAMINATION A. Verify that surfaces are ready to receive work. B. Verify field dimensions and coordinate physical size of all equipment with the architectural requirements of the spaces into which they are to be installed. Allow space for adequate ventilation and circulation of air. C. Verify that required utilities are available, in proper location, and ready for use. D. Beginning of installation means installer accepts existing conditions. 3.3 INSTALLATION A. Install in accordance with manufacturer's instructions and approved shop drawings. B. All wiring shall be installed in conduit. Class II low voltage control wiring may be open wiring and shall maintain 150 mm (6 inch) spacing from electronic ballast and other RFI/EMI sources. C. All branch load circuits shall be live tested before connecting the loads to the lighting control panel. 3.4 SUPPORT SERVICES A. System Startup: 1. Manufacturer shall provide factory authorized technician to confirm proper installation and operation of all system components. B. Testing: 904 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 09 33 - 12 LIGHTING CONTROL SYSTEMS 1. System shall be completely functional tested by a factory-authorized technician. All loads shall be tested live for continuity and freedom from defects, and all control wiring shall be tested for continuity and connections prior to energizing the system components. 2. Programming of initial zones, schedules, lighting levels, control station groups, and sensor settings shall be performed by a factory-authorized technician. Lighting Control Sequence of Operation shall serve as a basis for programming, However, all final decisions regarding groups and schedules shall be at the direction of the Owner. The following procedures shall be performed at a minimum: a. Confirm occupancy sensor placement, sensitivity, and time delay settings to meet specified performance criteria. b. Confirm daylight sensor placement, sensitivity, deadband, and delay settings to meet specified performance criteria. c. Confirm that schedules and time controls are configured to meet specified performance criteria and Owner's operating requirements. 3. Verify occupancy/vacancy and daylight sensor operation is correct after furniture and equipment is installed in each area. Make adjustments to sensor settings and time delays to allow proper operation. 4. Verify occupancy/vacancy sensors are located to provide complete coverage for the area served with no nuisance switching. a. Relocate sensors or provide additional sensors as necessary to provide adequate coverage. b. Mask occupancy sensors where necessary to prevent nuisance switching from adjacent areas. C. Training: 1. Manufacturer shall provide competent factory-authorized technician to train Owner personnel in the operation, maintenance and programming of the lighting control system. Submit training plan with notification seven (7) days prior to proposed training dates. 2. Training duration shall be no less than three (3) days, with one (1) day being scheduled at least two (2) weeks after initial training. D. Documentation: 1. Manufacturer shall provide system documentation including: a. System one-line showing all panels, number and type of control stations and sensors, communication line, and network or BMS/BAS interface unit. b. Drawings for each panel showing hardware configuration and numbering. c. Panel wiring schedules. d. Typical diagrams for each component. END OF SECTION 26 09 33 905 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 24 16 - 1 PANELBOARDS SECTION 26 24 16 PANELBOARDS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Service and distribution panelboards: DP-#, DP-# B. Lighting and appliance branch circuit panelboards: Panel '###' 1.2 RELATED SECTIONS AND WORK A. Refer to the Electrical Distribution Diagram and Electrical Schedules for size, rating, and configuration. 1.3 REFERENCES A. NEMA AB 1 - Molded Case Circuit Breakers B. NEMA FU 1 - Low voltage cartridge fuses C. NEMA KS 1 - Enclosed Switches D. NEMA PB 1 - Panelboards E. NEMA PB 1.1 - Instructions for Safe Installation, Operation and Maintenance of Panelboards Rated 600 Volts or Less F. NEMA PB 1.2 - Application Guide for Ground-fault Protective Devices for Equipment G. UL 248 - Low-Voltage Fuses H. UL 67 - Panelboards 1.4 SUBMITTALS A. Submit shop drawings for equipment and component devices under provisions of Section 26 05 00. B. Include outline and support point dimensions, voltage, main bus ampacity, integrated short circuit ampere rating, circuit breaker and fusible switch arrangement and sizes. C. Selective Coordination Study: Submit study to prove that all essential electrical systems, emergency systems and legally required standby system panelboards are selectively coordinated with all supply side overcurrent protective devices. D. Arc Energy Reduction Documentation: Submit documentation to demonstrate the arc energy reduction system is set to operate at a value below the available arcing current. 906 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 24 16 - 2 PANELBOARDS E. Submit manufacturer's instructions under provisions of Section 26 05 00. PART 2 - PRODUCTS 2.1 RATINGS A. Definitions: 1. Series rated equipment shall be defined as equipment that can achieve a required UL AIC rating with an upstream device such as a main breaker or a combination of devices to meet or exceed a required UL AIC rating. All series rated equipment shall have a permanently attached nameplate indicating that device rating must be maintained. See Section 26 05 53 for additional requirements. 2. Fully rated equipment shall be defined as equipment where all devices in that equipment shall carry a minimum of the AIC rating that is specified. B. The panelboards for this project shall be fully rated unless otherwise specifically noted in the Drawings or Specifications. 2.2 MAIN AND DISTRIBUTION PANELBOARDS A. General 1. Manufacturers: a. Square D QMB, I-Line b. ABB ReliaGear Entelleon c. Siemens F2, P4 d. Eaton PRL4, PRL5 B. Panelboards: NEMA PB 1; type as shown on the drawings. C. Enclosure: NEMA PB 1; Type 1. D. Provide cabinet front with concealed trim clamps and hinged trim on door to allow access to wiring gutters without removal of trim and flush lock. Door hardware shall provide swing clear operation (180-degree swing). Finish in manufacturer's standard gray enamel. E. Provide panelboards with copper bus, ratings as scheduled on the drawings. Provide copper ground bus in all panelboards. F. All spaces shown on the one-line diagram shall be fully prepared spaces for future breakers. G. Minimum Integrated Short Circuit Rating: 100,000 amperes rms symmetrical for 240- volt panelboards; 50,000 amperes rms symmetrical for 480-volt panelboards, or as shown on the drawings. 907 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 24 16 - 3 PANELBOARDS H. Fusible Switch Assemblies: NEMA KS 1; quick-make, quick-break, load interrupter enclosed knife switch with externally operable handle. Provide interlock to prevent opening front cover with switch in ON position. Handle lockable in OFF position. I. Fuse Clips (Switches 600 Amperes and Smaller): Provide with Class 'R' rejection clips. Fuse Clips (601 Amperes and Larger): Designed to accommodate Class 'L' fuses. J. Molded Case Circuit Breakers: Provide circuit breakers with integral thermal and instantaneous magnetic trip in each pole. K. Molded Case Circuit Breakers with Current Limiters: Provide circuit breakers with replaceable current limiting elements, in addition to integral thermal and instantaneous magnetic trip in each pole. L. Current Limiting Molded Case Circuit Breakers: Provide circuit breakers with integral thermal and instantaneous magnetic trip in each pole, coordinated with automatically resetting current limiting elements in each pole. Interrupting rating 100,000 symmetrical amperes, let-through current and energy level less than permitted for same size Class RK-5 fuse. M. Solid State Molded Case Circuit Breakers: (All breakers identified on plans as solid- state with 1,200 ampere frame sizes and below.) Provide molded case switch with electronic sensing, timing, and tripping circuits for fully adjustable time current characteristic settings including ground fault trip, instantaneous trip, long time trip, long time delay, short time trip, and short time delay. Trip setting shall be field programmable with a sealable clear cover. N. Suitable for use as service entrance equipment. Provide line side (service style) barriers. 2.3 BRANCH CIRCUIT PANELBOARDS A. General 1. Manufacturers: a. Square D NQ, NF b. ABB A Series c. Siemens P1 d. Eaton PRL1, PRL2 B. Lighting and Appliance Branch Circuit Panelboards: NEMA PB 1; circuit breaker type. C. Enclosure: NEMA PB 1; Type 1. D. Provide cabinet front with door-in-door construction, concealed hinge, and flush lock all keyed alike. Door hardware shall provide swing clear operation (180-degree swing). Finish in manufacturer's standard gray enamel. E. Provide panelboards with copper bus, ratings as scheduled on the drawings. Provide copper ground bus in all panelboards. 908 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 24 16 - 4 PANELBOARDS F. All unlabeled circuits shown on the panelboard schedule shall be fully prepared spaces for future breakers. G. All multiple-section panelboards shall have the same dimensional back box and cabinet front size. H. Minimum Integrated Short Circuit Rating: As shown on the drawings. I. Provide handle lock-on devices for all breakers serving exit sign and lighting circuits with emergency battery units. Provide handle lock-on devices and red handles for breakers serving fire alarm panels. J. Molded Case Circuit Breakers: Bolt-on type thermal magnetic trip circuit breakers, with common trip handle for all poles. Provide circuit breakers UL listed as Type SWD for lighting circuits. Provide UL Class A ground fault interrupter circuit breakers where scheduled on the drawings. Do not use tandem circuit breakers. K. Current Limiting Molded Case Circuit Breakers: Provide circuit breakers with integral thermal and instantaneous magnetic trip in each pole, coordinated with automatically resetting current limiting elements in each pole. Interrupting rating 100,000 symmetrical amperes, let-through current and energy level less than permitted for same size Class RK-5 fuse. L. Suitable for use as service entrance equipment. Provide line side (service style) barriers. PART 3 - EXECUTION 3.1 INSTALLATION A. Install panelboards plumb as indicated on the drawings in conformance with NEMA PB 1.1. B. Height: 6 feet to handle of highest device. C. Provide filler plates for unused spaces in panelboards. D. Provide custom typed circuit directory for each branch circuit panelboard. Provide updated custom typed circuit directory for each existing branch circuit panelboard with new or revised circuits per the scope of work. Label shall include equipment name or final approved room name, room number, and load type for each circuit (examples: SUMP SP-1 or ROOM 101 RECEPT). Revise directory to reflect circuit changes required to balance phase loads. Printed copies of the bid document panel schedules are not acceptable as circuit directories. E. Install fuses in fusible switch assemblies. 909 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 24 16 - 5 PANELBOARDS 3.2 FIELD QUALITY CONTROL A. Measure steady state load currents at each panelboard feeder. Should the difference at any panelboard between phases exceed 20 percent, rearrange circuits in the panelboard to balance the phase loads within 20 percent. Take care to maintain proper phasing for multi-wire branch circuits. B. Visual and Mechanical Inspection: Inspect for physical damage, proper alignment, anchorage, and grounding. Check proper installation and tightness of connections for circuit breakers, fusible switches, and fuses. END OF SECTION 26 24 16 910 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 16 - 1 CABINETS AND ENCLOSURES SECTION 26 27 16 CABINETS AND ENCLOSURES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Cabinets B. Terminal blocks and accessories 1.2 REFERENCES A. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum) B. ANSI/NEMA ICS 1 - Industrial Control and Systems C. ANSI/NEMA ICS 4 - Terminal Blocks for Industrial Control Equipment and Systems D. ANSI/NEMA ICS 6 - Enclosures for Industrial Control Equipment and Systems 1.3 SUBMITTALS A. Submit product data under provisions of Section 26 05 00. B. Shop Drawings for Equipment Panels: Include wiring schematic diagram, wiring diagram, outline drawing and construction diagram as described in ANSI/NEMA ICS 1. C. Include cabinets and enclosures in composite electronic coordination files. Refer to Section 26 05 00 for coordination drawing requirements. PART 2 - PRODUCTS 2.1 CABINETS A. Cabinet Fronts: Steel, flush type with concealed trim clamps, concealed hinge and flush lock keyed to match branch circuit panelboard; finish in gray baked enamel. 2.2 TERMINAL BLOCKS AND ACCESSORIES A. Terminal Blocks: ANSI/NEMA ICS 4; UL listed. B. Power Terminals: Unit construction type, closed-back type, with tubular pressure screw connectors, rated 600 volts. C. Signal and Control Terminals: Modular construction type, channel mounted; tubular pressure screw connectors, rated 300 volts. 911 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 16 - 2 CABINETS AND ENCLOSURES PART 3 - EXECUTION 3.1 INSTALLATION A. Install cabinets and enclosures plumb; anchor securely to wall and structural supports at each corner, minimum. B. Provide accessory feet for free-standing equipment enclosures. C. Install trim plumb. END OF SECTION 26 27 16 912 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 1 WIRING DEVICES SECTION 26 27 26 WIRING DEVICES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Device plates and box covers B. Receptacles (REC-#) 1.2 QUALITY ASSURANCE A. Provide similar devices from a single manufacturer. B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in the Electrical Code, by a testing agency to Authorities Having Jurisdiction and marked for intended use. C. Comply with the Electrical Code. 1.3 REFERENCES A. DSCC W-C-896F - General Specification for Electrical Power Connector B. FS W-C-596 - Electrical Power Connector, Plug, Receptacle, and Cable Outlet C. NEMA WD 1 - General Color Requirements for Wiring Devices D. NEMA WD 6 - Wiring Devices - Dimensional Requirements E. NFPA 70 - National Electrical Code (NEC) F. CEC California Electrical Code G. UL 498 - Standard for Attachment Plugs and Receptacles H. UL 943 - Standard for Ground Fault Circuit Interrupters 1.4 SUBMITTALS A. Submit product data under provisions of Section 26 05 00. B. Provide product data showing configurations, finishes, dimensions, and manufacturer's instructions. C. Provide a non-returnable sample of each countertop and furniture-mounted receptacle assembly as part of the submittal process. 913 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 2 WIRING DEVICES 1.5 COORDINATION A. Receptacles for Owner Furnished Equipment: Match plug configurations. B. Cord and Plug Sets: Match equipment requirements. C. Coordinate installation of receptacle assemblies in countertops and furniture with the Contractor providing the countertop or furniture. Contractor shall coordinate penetrations and conduit routing in countertops and furniture with drawings and other obstacles below the installation surface. PART 2 - PRODUCTS 2.1 DEVICE COLOR A. All switch, receptacle, and outlet colors shall be white, unless indicated otherwise. 2.2 COVERPLATES A. All switches, receptacles, and outlets shall be complete with the following: 1. Unbreakable thermoplastic/thermoset plastic and match device color coverplates in finished spaces where walls are finished. 2. Decorator Grade - Public: Decorator thermoset plastic and match device color thermoplastic and match device color #302 stainless steel wallplates in public finished spaces where walls are finished. a. Manufacturer: 1) Leviton Decora 2) Hubbell Decorator 3) Cooper Decorator 4) or approved equal 3. Decorator Grade - Screwless: Decorator snap-on nylon or polycarbonate wallplates with sub-base in public finished spaces; match device color. a. Manufacturer: 1) Leviton 803## 2) Hubbell RCW 3) Cooper PJS 4) Pass & Seymour SWP 5) or approved equal 4. #302 stainless steel coverplates in unfinished spaces for flush boxes. 5. Galvanized steel coverplates in unfinished spaces for surface mounted boxes. B. Where several devices are ganged together, the coverplate shall be of the ganged style for the number of devices used. C. Plate securing screws shall be metal with head color matching the wall plate finish. 914 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 3 WIRING DEVICES 2.3 RECEPTACLES A. Refer to Electrical Symbols List for device type. B. REC-DUP: NEMA 5-20R Duplex Receptacle: 1. Standard Grade: 125-volt, 20 amp, 3-wire grounding type with impact resistant thermoplastic face and steel back strap. a. Manufacturers: 1) Hubbell 5352A 2) Leviton, 5362-S 3) Pass & Seymour 5362 4) Cooper 5352 2. Decorator Grade: Provide decorative style duplex receptacles in public spaces where walls are finished. a. Manufacturers: 1) Hubbell DR20 2) Leviton 16362 3) Pass & Seymour 26342 4) Cooper 6352 3. Spec Grade: 125-volt, 20 amp, 3-wire grounding type with impact resistant thermoplastic face and brass back strap. a. Manufacturers: 1) Hubbell 5352 2) Leviton 5362-S 3) Pass & Seymour 5362 4) Cooper 5362 C. REC-DUP-GFI: NEMA 5-20R Ground Fault Duplex Receptacle: 1. Standard Grade: 125-volt, 20 amp, 3-wire grounding type with test and reset buttons in impact resistant thermoplastic face. a. Device shall perform self-test of GFCI circuitry in accordance with UL 943. b. Manufacturers: 1) Hubbell GF20L GFCI type devices are not allowed. Contractor may substitute an alternative manufacturer when Hubbell is the basis of submittal for all other wiring devices. 2) Leviton GFNT2 3) Pass & Seymour 2097 4) Cooper SGF20 D. REC-DUP-WP: NEMA 5-20R Weatherproof Ground Fault Duplex Receptacle: 915 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 4 WIRING DEVICES 1. 125-volt, 20 amp, 3-wire grounding type with test and reset buttons in impact resistant thermoplastic face, weather resistant WR listed. Provide extra-duty NEMA 3R rated while-in-use clear cover. 2. Device shall perform self-test of GFCI circuitry in accordance with UL 943. a. Manufacturers: 1) Hubbell: a) GFTWRST20 with clear housing RW57300 b) GFCI type devices are not allowed. Contractor may substitute an alternative manufacturer when Hubbell is the basis of submittal for all other wiring devices. 2) Leviton GFWT2 with clear housing 5977-CL 3) Pass & Seymour 2097TRWR with clear housing WIUC10-C 4) Cooper WRSGF20 with clear housing WIU-1 E. REC-TAMP: NEMA 5-20R Tamper Resistant Duplex Receptacle: 1. Standard Grade: 125-volt, 20 amp, 3-wire grounding type with impact resistant thermoplastic face. a. Manufacturers: 1) Hubbell BR20TR 2) Leviton TBR20 3) Pass & Seymour TR5362 4) Cooper TRBR20 2. Decorative Grade: Provide decorative style duplex tamper resistant receptacles in public spaces where walls are finished. a. Manufacturers: 1) Hubbell DR20TR 2) Leviton TDR20 F. REC-TAMP-GFI: NEMA 5-20R GFI Tamper Resistant Receptacle: 1. Standard Grade: 125-volt, 20 amp, 3-wire grounding type tamper-resistant with test and reset buttons in impact resistant thermoplastic face. a. Device shall perform self-test of GFCI circuitry in accordance with UL 943. b. Manufacturers: 1) Hubbell GFTR20 2) Cooper TRSGF20 3) Pass & Seymour 2097TR 2. Hospital Grade: 125-volt, 20 amp, 3-wire grounding type hospital grade tamper- resistant, weather resistant WR listed, with test and reset buttons in impact resistant thermoplastic face. 916 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 5 WIRING DEVICES G. REC-TAMP-QUAD: NEMA 5-20R Double Duplex Tamper Resistant Receptacle: 1. Consists of two duplex tamper resistant receptacles, double gang box, plaster ring and faceplate. a. Manufacturers: 1) Refer to Tamper Resistant Receptacle above. H. REC-QUAD-O: NEMA 5-20R Plug Load Controlled Duplex Receptacle: 1. Consists of two plug load controlled duplex receptacles, double gang box, plaster ring and faceplate. a. Manufacturers: 1) Refer to Plug Load Controlled Duplex Receptacle above. I. REC-QUAD: NEMA 5-20R Double Duplex Receptacle: 1. Consists of two duplex receptacles, double gang box, plaster ring and faceplate. a. Manufacturers: 1) Refer to Duplex Receptacle above. J. REC-QUAD-GFI: NEMA 5-20R Double Duplex GFI Receptacle: 1. Consists of two duplex GFI receptacles, double gang box, plaster ring and faceplate. a. Manufacturers: 1) Refer to Duplex GFI Receptacle above. K. Back wired devices shall be complete with eight holes that are screw activated with metal clamps for connection to #12 or #10 copper conductors. L. Side wired devices shall have four binding screws that are undercut for positive wire retention. M. Ground fault circuit interrupter (GFCI) receptacles shall comply with UL 943 requiring increased surge immunity, improved corrosion resistance, improved resistance to false tripping and diagnostic indication for miswiring if the line and load conductors are reversed during installation. N. Isolated ground receptacles shall have the equipment ground contacts connected only to the green grounding screw terminal of the device with inherent electrical isolation from the mounting strap. 2.4 FLOOR BOXES A. Cover Color and Style: Verify with Architect from manufacturer standard options. 917 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 6 WIRING DEVICES B. Refer to Technology drawings for voice/data, Audio/Video outlet, and coordination requirements. C. FB-#: Square or Rectangular (Standard): 1. Floor Box, square or rectangular, square/rectangular flush-mounted hinged cover with flange, provide complete with appropriate outlet cover plates and hardware, for use with -inch minimum concrete pour floors, fully adjustable. 2. Gang / Outlet Descriptions: a. 125 Volt, 20 amp, NEMA 5-20R duplex receptacle with 3/4-inch conduit. b. Voice/Data outlet with 3/4-inch conduit. c. Audio/Visual outlet with 1-inch conduit. d. Power furniture/equipment feed with flexible whip and 1-inch conduit. e. Voice/Data furniture/equipment feed with flexible whip and 1-inch conduit. f. Audio/Visual furniture/equipment feed with flexible whip and 1-inch conduit. g. Spare with 1- inch conduit. h. Refer to Technology drawings for additional information related to voice/data and audio/visual outlet requirements. 3. Manufacturers: a. Cast: 1) Hubbell B### Series 2) Legrand Wiremold 880 Series 3) ABB Steel City 640 / 840 Series b. Stamped Steel: 1) Hubbell 242# Series 2) Legrand Wiremold 880 Series 3) ABB Steel City 740 Series c. Non-Metallic PVC: 1) Hubbell 2) Legrand Wiremold 880 Series 3) ABB Steel City 640 Series 4. Installation: Group route raceway conduits under slab on grade or in elevated slab to nearest wall. Route conduits to nearest wall or as shown on drawings. Provide hub reducers when applicable. 2.5 POKE-THROUGH FITTINGS A. Cover Color and Style: Verify with Architect from manufacturer standard options. B. Refer to Technology drawings for voice/data, Audio/Video outlet, and coordination requirements. C. Terminate in 4-inch square by 2-1/2-inch deep junction box. 918 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 7 WIRING DEVICES D. Suitable for installation with a floor thickness of 2-1/4 to 7 inches. E. PT-#: 3" Fire Rated Poke-Through: 1. Semi-flush mounted, hinged covers, for use with 3-inch core holes, provide complete with appropriate outlet coverplates and hardware. UL 514 scrub rated listed. 2. Gang / Outlet Descriptions, route conduit in ceiling space of lower level. Provide provisions to core drill floor to route power circuits to panel on same floor as poke through. Route low voltage raceways to scheduled technology room: a. 125 Volt, 20 amp, NEMA 5-20R duplex receptacle. b. Voice/Data outlet. c. Audio/Visual outlet. d. Power furniture/equipment feed with flexible whip. e. Voice/Data furniture/equipment feed with flexible whip. f. Audio/Visual furniture/equipment feed with flexible whip. g. Conduit Raceway (in ceiling space below floor): 1) Power: 3/4-inch conduit. 2) Voice/Data: 3/4-inch conduit. 3) Audio/Visual: 1-inch conduit. h. Refer to Technology drawings for additional information related to voice/data and audio/visual outlet requirements. 3. Manufacturers: 1) Hubbell PT2X2 2) Wiremold 3) Thomas & Betts F. PT-#: 4" Fire Rated Poke-Through: 1. Semi-flush mounted, hinged covers, for use with 4-inch core holes, provide complete with appropriate outlet coverplates and hardware. UL 514 scrub rated listed. 2. Gang / Outlet Descriptions, route conduit in ceiling space of lower level. Provide provisions to core drill floor to route power circuits to panel on same floor as poke through. Route low voltage raceways to scheduled technology room: a. 125 Volt, 20 amp, NEMA 5-20R duplex receptacle. b. Voice/Data outlet. c. Audio/Visual outlet. d. Power furniture/equipment feed with flexible whip. e. Voice/Data furniture/equipment feed with flexible whip. f. Audio/Visual furniture/equipment feed with flexible whip. g. Spare. h. Conduit Raceway (in ceiling space below floor): 1) Power: 3/4-inch conduit. 2) Voice/Data: 3/4-inch conduit. 3) Audio/Visual: 1-inch conduit. 919 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 8 WIRING DEVICES i. Refer to Technology drawings for additional information related to voice/data and audio/visual outlet requirements. 3. Manufacturers: a. Hubbell SystemOne Series b. Legrand Wiremold 4RF/RC Series c. ABB Steel City FPT4 Series PART 3 - EXECUTION 3.1 INSTALLATION A. Install convenience receptacles at elevations indicated in the General Installation Notes on the contract drawings. B. Install specific-use receptacles at heights shown on the contract drawings. Install devices level, plumb, and square with building lines. Coordinate installation of adjacent devices of separate systems with common mounting heights, including lighting, power, systems, technology, and temperature control device rough-ins. C. Ground Fault Protection: Provide ground fault protection for all branch circuit breakers serving 120/208 receptacle outlets rated 21 - 50 amps single phase and 21-100 amps three phase in the following locations, as shown on drawings, or required by adopted code: 1. Bathrooms 2. Break Room 3. Rooftops 4. Interior/Exterior locations subject to damp/wet conditions 5. When located within 6 feet of sinks. D. Tamper Resistant Protection: Provide tamper resistant protection for all 15 / 20-amp 120/208 straight blade wiring devices in the following locations, as shown on the drawings, or required by adopted code. 1. Business Office: Corridors, waiting rooms, common areas 2. Public Buildings: Corridors, waiting rooms, common areas E. Drill opening for poke-through fitting installation in accordance with manufacturer's instructions. This Contractor is responsible for taking any measures required to ensure no conduits or other services are damaged. This may include X-ray or similar non- destructive means. F. Install receptacles vertically with ground slot up or where indicated on the drawings, horizontally with ground slot to the left. G. Install decorative plates on switch, receptacle, and blank outlets in finished areas, using jumbo size plates for outlets installed in masonry walls. H. Install galvanized steel plates on outlet boxes and junction boxes in unfinished areas, above accessible ceilings, and on surface-mounted outlets. 920 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 27 26 - 9 WIRING DEVICES I. Install devices and wall plates flush and level. END OF SECTION 26 27 26 921 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 28 13 - 1 FUSES SECTION 26 28 13 FUSES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Fuses 1.2 REFERENCES A. UL 198C - High-Interrupting Capacity Fuses; Current Limiting Types B. UL 198E - Class R Fuses C. FS W-F-870 - Fuseholders (For Plug and Enclosed Cartridge Fuses) D. NEMA FU 1 - Low Voltage Cartridge Fuses E. NFPA 70 - National Electrical Code (NEC) F. CEC California Electrical Code 1.3 SUBMITTALS A. Submit product data under provisions of Section 26 05 00. 1.4 PROJECT CONDITIONS A. Where ambient temperature to which fuses are directly exposed is less than 40°F or more than 100°F, apply manufacturer's ambient temperature adjustment factors to fuse ratings. PART 2 - PRODUCTS 2.1 MANUFACTURERS - FUSES A. Bussman, Division of Eaton B. Edison Fuse, Division of Cooper Industries C. Mersen D. Littelfuse Inc 2.2 FUSES A. Dimensions and Performance: NEMA FU 1, Class as specified or indicated. B. Voltage: Provide fuses with voltage rating suitable for circuit phase-to-phase voltage. 922 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 28 13 - 2 FUSES C. Fuses with ratings larger than 600 amperes: Class L (time delay), unless otherwise noted on the drawings. D. Fuses with ratings larger than 200 amperes but equal to or less than 600 amperes: Class RK-1 (time delay), unless otherwise noted on the drawings. E. Fuses with ratings less than or equal to 200 amperes (not including control transformer fuses): Class RK-5, unless otherwise noted on the drawings. F. Fuses for packaged equipment: Size and type as recommended by equipment manufacturer. PART 3 - EXECUTION 3.1 INSTALLATION A. Install fuses where indicated on the drawings and specifications. B. Install fuses in accordance with manufacturer's instruction. C. Install fuses in packaged equipment as required by equipment manufacturer. D. Install fuse with label oriented such that manufacturer, type, and size are easily read. END OF SECTION 26 28 13 923 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 28 16 - 1 DISCONNECT SWITCHES SECTION 26 28 16 DISCONNECT SWITCHES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Fusible switches B. Non-fusible switches C. Motor disconnect switch D. Enclosures 1.2 RELATED SECTIONS AND WORK A. Refer to the Disconnect and Starter Schedule for rating and configuration. 1.3 REFERENCES A. NEMA KS 1 - Enclosed Switches 1.4 SUBMITTALS A. Submit product data under provisions of Section 26 05 00. B. Product Data: For each type of enclosed switch, circuit breakers, accessory and component indicated, include dimensions, weights, and manufacturer's technical data on features, performance, and ratings. C. Electrical Characteristics: For each type of enclosed switch, enclosure types, current and voltage ratings, short-circuit current ratings, UL listing for series rating of installed devices, features, characteristics, ratings, and factory settings of individual overcurrent protective devices and auxiliary components. 1.5 COORDINATION A. Coordinate layout and installation of switches, circuit breakers, and components with other construction, including conduit, piping, equipment, and adjacent surfaces. Maintain required workspace clearances and required clearances for equipment access doors and panels. PART 2 - PRODUCTS 2.1 FUSIBLE AND NON-FUSIBLE SWITCHES A. Acceptable Manufacturers: 924 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 28 16 - 2 DISCONNECT SWITCHES 1. Square D 3110 Series 2. Eaton DH Series 3. ABB TH Series 4. Siemens HNF / HF Series B. FDS-#; Fusible Switch Assemblies: NEMA KS 1; Type heavy duty, quick-make, quick- break, load interrupter enclosed knife switch with externally operable handle interlocked to prevent opening front cover with switch in ON position. Handle lockable in OFF position. Fuse Clips: Class 'R' fuse clips only, unless indicated otherwise on the drawings. C. DS-#; Non-fusible Switch Assemblies: NEMA KS 1; Type heavy duty, quick-make, quick-break, load interrupter enclosed knife switch with externally operable handle interlocked to prevent opening front cover with switch in ON position. Handle lockable in OFF position. D. Enclosures: Type as indicated on the disconnect schedule. E. Accessories: As indicated on the disconnect schedule. PART 3 - EXECUTION 3.1 INSTALLATION A. Install disconnect switches where indicated on the drawings. B. Install fuses in fusible disconnect switches. C. Provide adhesive label on inside door of each switch indicating UL fuse class and size for replacement. 3.2 ADJUSTING A. Set field-adjustable circuit breaker trip ranges. END OF SECTION 26 28 16 925 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 1 PACKAGED ENGINE GENERATOR SYSTEMS SECTION 26 32 13 PACKAGED ENGINE GENERATOR SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Battery and charger 1.2 REFERENCES A. ANSI/NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum) B. ANSI/NEMA AB 1 - Molded Case Circuit Breakers C. ANSI/NEMA MG 1 - Motors and Generators D. NFPA 37 - Installation and Use of Stationary Combustion Engines and Gas Turbines E. NFPA 70 - National Electrical Code (NEC) F. CEC California Electrical Code G. NFPA 110 - Standard for Emergency and Standby Power Systems H. IEEE 446 - Recommended Practice for Emergency and Standby Power Systems for Commercial and Industrial Applications I. Environmental Protection Agency EPA Emission Standards for Compressed Ignition Engines J. Noise Emission: Comply with applicable state and local government requirements for maximum noise level at property boundaries due to sound emitted by the generator set, its components and the operation thereof. 1.3 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 26 05 00. B. Submit shop drawings showing plan and elevation views with overall and interconnection point dimensions, fuel consumption rate curves at various loads, ventilation and combustion air requirements, and electrical diagrams including schematic and interconnection diagrams. C. Submit product data showing dimensions, weights, ratings, interconnection points, and internal wiring diagrams for engine, generator, control panel, battery, battery rack, battery charger, exhaust silencer, vibration isolators, and remote annunciator. 926 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 2 PACKAGED ENGINE GENERATOR SYSTEMS 1. Include work clearance and equipment access information. Clearly identify required equipment access locations for installation, maintenance, testing, and repair. D. Submit certificates for compliance with EPA Emissions Standards for Compressed Ignition Engines. E. Submit manufacturer's installation instructions under provisions of Section 26 05 00. F. EXTRA MATERIALSFurnish Extra Material per City Approval G. Submit maintenance materials under provisions of Section 26 05 00. H. Furnish one set of tools required for preventative maintenance of the engine generator system. Package tools in adequately sized metal toolbox. I. Provide two additional sets of each fuel, oil, and air filter element required for the engine generator system. Provide additional fuel polishing filters for one year of operation. 1.4 DELIVERY, STORAGE, AND HANDLING A. Deliver products to site under provisions of Section 26 05 00. B. Store and protect products under provisions of Section 26 05 00. C. Accept packaged engine generator set and accessories on site in crates and verify damage. D. Protect equipment from dirt and moisture by securely wrapping in heavy plastic. 1.5 SYSTEM DESCRIPTION A. Engine generator system to provide source of emergency and standby power. B. System Capacity: 250 KW, 313KVA , at an elevation of 1,000 feet above sea level, and ambient temperature between -20°F and 110°F; standby rating using engine- mounted radiator. C. Emergency Power Supply System (EPSS) shall be NFPA 110 Type 10 Class 48 Level 1. D. Operation: In accordance with ANSI/NFPA 110. 1.6 COORDINATION DRAWINGS A. Reference Coordination Drawings article in Section 26 05 00 for required generator electronic CAD drawings to be provided to Coordinating Contractor for inclusion into composite coordination drawings. Show generator, fuel system components, battery system components, and exhaust system in 1/4" scale plan of room. 927 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 3 PACKAGED ENGINE GENERATOR SYSTEMS 1.7 PROJECT RECORD DOCUMENTS A. Submit record documents under provisions of Section 26 05 00. B. Accurately record location of engine generator and mechanical and electrical connections. 1.8 OPERATION AND MAINTENANCE DATA A. Submit operation and maintenance data under provisions of Section 26 05 00. B. Include instructions for normal operation, routine maintenance requirements, service manuals for engine and day tank, oil sampling and analysis for engine wear, and emergency maintenance procedures. 1.9 QUALIFICATIONS A. Manufacturer: Company specializing in packaged engine generator system with minimum five (5) years documented experience. B. Manufacturer: Company with minimum five (5) years of documented on-board paralleling system experience. C. Supplier: Authorized distributor of engine generator manufacturer with service facilities within 100 miles of the project site. 1.10 WARRANTY A. Provide a two (2) year warranty under provisions of Section 26 05 00. 1.11 MAINTENANCE SERVICE A. Furnish service and maintenance of packaged engine generator system for one (1) year from Date of Notice of Completion. Maintenance service shall be performed by skilled employees of manufacturer's designated service organization. Include quarterly exercising, and routine preventive maintenance as recommended by manufacturer and adjusting as required for proper operation. Maintenance agreements shall include parts, supplies, and labor. After one year, City will exercise maintenance agreement in place for all others. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Generac. B. Cummins Power Generation C. Caterpillar D. Kohler 928 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 4 PACKAGED ENGINE GENERATOR SYSTEMS 2.2 PACKAGED ENGINE-GENERATOR SET (GEN-1) A. Packaged engine-generator set shall be a coordinated assembly of compatible components. Stationary generators shall be listed. B. Safety Standard: Comply with ASME B15.1 and UL 2200. C. Nameplates: Each major system component shall be equipped with a nameplate to identify manufacturer's name and address, model and serial number, and component rating in integrated set and as required by the contract documents. D. Fabricate engine-generator set mounting frame and attachment of components to resist generator-set movement during a seismic event when generator-set mounting frame is anchored to generator concrete pad. E. Maximum Dimensions : 208.3"L x 53.4"W x 134.3"H. 2.3 ENGINE A. Type: Water-cooled in-line or V-type, ignition diesel electric ignition internal combustion engine. B. Rating: Sufficient to operate at 100 percent load for 48 hours at specified elevation and ambient limits. C. Fuel: Appropriate for use of No. 2 fuel oil. D. Engine Speed: 1800 RPM. E. Governor: Isochronous type with speed sensing. F. Safety Devices: Engine shutdown on high water temperature, low oil pressure, overspeed, and engine overcrank. Limits as selected by manufacturer. G. Frequency Response: 1. Steady State Operational Bandwidth: 0.5 percent of rated frequency from no load to full load. 2. Transient Response: Less than 5 percent for a 50 percent step-load increase or decrease. Frequency shall recover and remain within the steady state operating band within 5 seconds. H. Fuel System:Engine mounted diesel fuel pump and relief-bypass valve. I. Fuel Supply System: 929 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 5 PACKAGED ENGINE GENERATOR SYSTEMS 1. Base-Mounted Fuel Tank: UL 142 listed fuel tank with 48-hour rated (NFPA 110 minimum run time by class) capacity. Integral rupture basin with leak detection. Provide fueling port with an overfill prevention type receptacle and lockable cap for exterior units. The tank shall include structural steel supports for top mounted engine generator set. Furnish complete with flexible fuel line connectors lockable cover, and analog level gauge. Furnish complete with float switches to indicate . The footprint of the base-mounted fuel tank shall not exceed the footprint of the generator frame for interior applications or the footprint of the enclosure for exterior installations. 2. Fuel Cooler: Provide unit-mounted fuel cooler with all required hoses, fittings and mounting hardware. Generators without a unit-mounted radiator shall have an integral fan powered by a 120V circuit. J. Lubrication System: Engine or skid mounted filter and strainer, thermostatic control valve capable of full flow and designed to be fail safe, and crankcase drain arranged for gravity drainage with siphon or pump. K. Engine Jacket Heater: Thermal circulation type water heater with integral thermostatic control, sized to maintain engine jacket water at 90°F, and suitable for operation on 208-3Ø volts AC. The minimum wattage of the heater shall be watts or as recommended by the manufacturer. L. Cooling System: Closed loop, liquid cooled, with radiator factory mounted on engine- generator set mounting frame and integral engine-driven coolant pump. 1. Fan and Core: Nonferrous-metal construction sized to contain expansion of total system. Blower type fan, sized to maintain safe engine temperature in ambient temperature of 110°F. Radiator Airflow Restriction: 0.5 inches of water, maximum. 2. Coolant: Solution of 50 percent ethylene-glycol-based antifreeze and 50 percent water, with anti-corrosive additives. 3. Provide expansion tank with gage glass and petcock, and self-contained, thermostatic-control temperature control valve. M. Engine Starting: DC starting system with positive engagement, number and voltage of starter motors in accordance with manufacturer's instructions. Include remote starting control circuit, with MANUAL-OFF-REMOTE selector switch on engine-generator control panel. Provide the following accessories: 1. Battery: Voltage to match starter with capacity for three cranking cycles without recharge. Provide with battery cables and acid resistant battery tray. 2. Battery-Charging Alternator: Factory mounted on engine with solid state voltage regulation. 3. Remote Start Circuit Monitoring: Provide continuous monitoring of the generator start circuits. A failure shall initiate visual and audible alarms at the generator, remote annunciators, and start the generator. 4. BC-#1 Battery Charger: Current limiting type designed to float at 2.17 volts per cell and equalize at 2.33 volts per cell. Include overload protection, full wave rectifier, DC voltmeter and ammeter, and 120 volts AC fused input. Provide wall- mounted enclosure to meet ANSI/NEMA 250, Type 1 requirements. 930 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 6 PACKAGED ENGINE GENERATOR SYSTEMS 5. Provide two battery strings, two DC power supply/chargers with monitoring, and a best battery selector system. Each shall be sized to provide total starting capacity. 6. DC Power Supply/Charger: Utility grade current limiting type with battery temperature compensation designed to float at 2.17 volts per cell and equalize at 2.33 volts per cell. Include overload protection, full wave filtered rectifier, digital DC voltmeter and ammeter, and 120 volts AC fused input. Provide wall-mounted enclosure to meet ANSI/NEMA 250, Type 1 requirements. 7. Best battery selector system for dual battery single load configuration. Solid-state design must isolate battery strings from each other. N. Exhaust System: Industrial type silencer (20 to 75 Hz frequency range; 87 dBA max at 25 feet), side inlet with muffler companion flanges and flexible stainless steel exhaust fitting, suitable for horizontal orientation, sized in accordance with engine manufacturer's instructions. Silencer shall include a threaded opening for connection of ¾" drain line. Opening shall be flush on inside of silencer. O. The packaged engine generator shall comply with the current Environmental Protection Agency EPA Emissions standards. P. Engine Accessories: Fuel filter, lube oil filter, intake air filter, lube oil cooler, fuel transfer pump, fuel priming pump, gear-driven water pump. Include fuel pressure gauge, water temperature gauge, and lube oil pressure gauge on engine-generator control panel. Q. Mounting: Provide unit with suitable spring-type vibration isolators. 2.4 GENERATOR A. Generator: ANSI/NEMA MG 1; three phase, re-connectible brushless synchronous generator with brushless exciter and PMG alternator excitation. B. Rating: As indicated on the drawings, at 0.8 power factor, 60 Hertz at RPM to match engine rating. C. Insulation: ANSI/NEMA MG 1, Class F. D. Temperature Rise: 105°C continuous. E. Enclosure: Standard Weather Protective Enclosure, Steel F. Voltage Regulation: 1. The maximum instantaneous voltage dip (IVD) shall be 28 percent. 2. Include solid-state type voltage regulator, separate from exciter to match engine and generator characteristics, with voltage regulation ±1 percent from no load to full load. Include manual controls to adjust voltage drop ±5 percent voltage level, and voltage gain. G. Subtransient Reactance (X'd): Maximum 15 percent. H. Windings: Two-thirds pitch stator winding and fully linked amortisseur winding. 931 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 7 PACKAGED ENGINE GENERATOR SYSTEMS I. Strip Heater: Thermostatically controlled unit arranged to maintain stator windings above dew point. 2.5 CONTROLS AND INDICATION A. Operating and safety indications, protective devices, basic system controls, and engine gauges shall be grouped in a common control and monitoring panel mounted on the generator set. Mounting method shall isolate the control panel from generator- set vibration. B. Ground Fault: Provide ground fault sensing at the generator. The sensor shall be located ahead of the generator service disconnect. Provide a ground fault indication on the engine-generator control panel. Provide an instruction nameplate at the control panel. 1. Instruction nameplate: Provide operational instructions for a ground fault indication as approved by the local Authority Having Jurisdiction. C. GANN; Remote Engine Annunciator Panel: NFPA 110 for a Level 1 system. Include the listed pre-alarm and alarm points, audible alarm, alarm silencing means, repetitive alarm circuitry, and lamp test switch in a surface mountInserted panel with brushed stainless steel finish. Provide all interconnecting wiring in conduit per manufacturer's requirements by the Electrical Contractor. The remotely reported alarms shall include the following. 1. Overcrank 2. Low water (engine) temperature 3. High engine temperature pre-alarm 4. High engine temperature 5. Low lube oil pressure pre-alarm 6. Low lube oil pressure 7. Overspeed 8. Low fuel main tank 9. Low coolant level 10. Not in auto 11. Emergency Power Supply (EPS) supplying load 12. High battery voltage 13. Low battery voltage 14. Battery charger failure (includes AC failure) 15. Generator running 16. Normal utility power 17. Emergency stop 18. Rupture basin alarm 19. Emergency Power Off Switch activated (EPO) 20. Alarm for power supply or UPS serving motorized breakers 21. Generator control and start signal failure. 22. On-board paralleling controls. 23. 80% load alarm. 932 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 32 13 - 8 PACKAGED ENGINE GENERATOR SYSTEMS PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that surfaces are ready to receive work and field dimensions are as shown on the drawings. B. Verify that required utilities are available in proper location and ready for use. C. Beginning of installation means installer accepts existing conditions. 3.2 INSTALLATION A. Install in accordance with manufacturer's instructions. B. Install remote manual stop station in location shown on plans. Provide 120 Volt power and wiring in conduit as required. Coordinate installation with the manufacturer approved shop drawings and wiring diagrams. The remote manual stop station shall shunt trip the generator mounted circuit breaker an d signal the engine prime mover to stop. C. The A-B-C phase rotation of the generator source shall match the A-B-C phase rotation of the utility source. The Contractor shall verify the generator and utility phase rotation match to prevent three phase motors and similar loads from operating backwards while being served by the generator. 3.3 ADJUSTING A. Adjust generator output voltage and engine speed. 3.4 CLEANING A. Clean work under provisions of Section 26 05 00. B. Clean engine and generator surfaces. Replace oil and fuel filters. END OF SECTION 26 32 13 933 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 36 00 - 1 TRANSFER SWITCH SECTION 26 36 00 TRANSFER SWITCH PART 1 - GENERAL 1.1 SECTION INCLUDES A. Automatic transfer switch with delayed transition ATS-# B. Remote annunciator for ATS RA-ATS-# 1.2 RELATED SECTIONS AND WORK A. Refer to the Transfer Switch Schedule for rating and configuration. 1.3 QUALITY ASSURANCE A. Manufacturer: Company specializing in automatic transfer equipment with three (3) years documented experience. 1.4 REFERENCES A. NEMA ICS 1 - General Standards for Industrial Control and Systems B. NEMA ICS 2 - Standards for Industrial Control Devices, Controllers, and Assemblies C. NEMA ICS 6 - Enclosures for Industrial Controls and Systems D. NEMA ICS 10 - Guide to Application of Low-Voltage Automatic Transfer Switch Equipment E. UL 1008 - Standard for Automatic Transfer Switches F. NFPA 110 - Standard for Emergency and Standby Power Systems 1.5 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 26 05 00. B. Submit product data for transfer switches showing overall dimensions, electrical connections, electrical ratings, and environmental requirements. C. Submit manufacturer's installation instructions under provisions of Section 26 05 00. 1.6 OPERATION AND MAINTENANCE DATA A. Submit operation and maintenance data under provisions of Section 26 05 00. B. Include instructions for operating equipment. 934 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 36 00 - 2 TRANSFER SWITCH C. Include instructions for operating equipment under emergency conditions when engine generator is running. D. Identify operating limits which may result in hazardous or unsafe conditions. E. Document ratings of equipment and each major component. F. Include routine preventive maintenance and lubrication schedule. G. List special tools, maintenance materials, and replacement parts. 1.7 REGULATORY REQUIREMENTS A. Conform to applicable code for emergency and standby electrical systems. PART 2 - PRODUCTS 2.1 AUTOMATIC TRANSFER SWITCH WITH DELAYED TRANSITION A. Automatic transfer switch, microprocessor controlled, three-position switch mechanism, delayed transition with local manual operation. B. Acceptable Manufacturers, Standard Grade: 1. Generac W Series 2. Cummins OTPC Series 3. Caterpillar CTG Series 4. Kohler KCS Series C. Description: NEMA ICS 2; automatic transfer switch. D. Configuration: Electrically-operated, three-position delayed transition / off capable, mechanically-held transfer switch. E. Control panel shall be micro-processor based. 2.2 SERVICE CONDITIONS A. Service Conditions: NEMA ICS 1. Suitable for use as service entrance equipment. Provide line side (service style) barriers. 2.3 RATINGS A. Refer to the electrical diagrams for the Withstand and Close Ratings WCR available interrupting capacity (AIC) at the transfer switch. The transfer switch shall be series rated with the equipment feeding the transfer switch. The series rating shall be the larger of the two Short Circuit Current Ratings SCCR values when the SCCR rating of the equipment feeding the normal and emergency sides of the transfer switch is not equal. B. Series rating with upstream devices shall be allowed per UL-1008. 935 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 36 00 - 3 TRANSFER SWITCH 2.4 AUTOMATIC SEQUENCE OF OPERATION A. Initiate Time Delay to Start Alternate Source Engine Generator: Upon initiation by normal source monitor. B. Time Delay to Start Alternate Source Engine Generator: 0 to 10 seconds, adjustable. C. Initiate Transfer Load to Alternate Source: Upon initiation by normal source monitor and permission by alternate source monitor. D. Initiate Retransfer Load to Normal Source: Upon permission by normal source monitor. E. Time Delay Before Transfer to Normal Power: 0 to 30 minutes, adjustable; bypass time delay in event of alternate source failure. F. Time Delay Before Engine Shut Down: 0 to 30 minutes, adjustable, of unloaded operation. 2.5 ENCLOSURE A. Enclosure: NEMA 3R 2.6 ACCESSORIES A. Provide 2 N.O. and 2 N.C. isolated contacts to indicate: 1. Normal source available. 2. Emergency source available. 3. Exercise mode in operation. B. RA-ATS-insert# Remote Annunciator: A remote annunciator shall be provided that shall monitor and control the following functions for each transfer switch: 1. Load Connect to Emergency/Normal Indication 2. Source Available: Emergency/Normal Indication 3. Time Delay Indication and Key Locked Bypass Switch 4. Transfer Test Indication and Key Locked Switch 5. Remote transfer loads between normal and emergency sources with Key Locked Switch 6. Remote generator start with Key Locked Switch 7. Remote generator stop with Key Locked Switch C. Annunciators shall be located where shown on the drawings, as directed by the Owner. Extend conduit and wire as required by the manufacturer. D. An adjustable emergency to normal pre-signal signal to elevator controller. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that surfaces are ready to receive work. 936 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 36 00 - 4 TRANSFER SWITCH B. Verify field measurements are as instructed by the manufacturer. C. Verify that required utilities are available, in proper location, and ready for use. D. Beginning of installation means acceptance of existing conditions. 3.2 CONTROL AND SIGNAL CABLING A. Provide control and signal cabling per manufacturer recommendations for the following systems components: 1. Remote annunciator. 2. Elevator controller. Provide wiring to elevator controller for emergency source mode and emergency to normal pre-signal. 3. Generator start signal. The generator start signal cabling for the following transfer switches shall be fire protected for a minimum of 2 hours using an approved method: a. Emergency, legally required, optional standby transfer switches b. Approved Methods: 1) Raceway or cable encased in a minimum of 2 inches of concrete cover. 2) Listed fire resistive raceway / cable system. 3) Raceway / cable is protected by a listed electrical circuit protective system. 3.3 INSTALLATION A. Install in accordance with manufacturer's instructions. END OF SECTION 26 36 00 937 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 51 19 - 1 LED LIGHTING SECTION 26 51 19 LED LIGHTING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Interior luminaires and accessories B. Exterior luminaires and accessories C. Light-emitting diode (LED) luminaire systems D. LED emergency lighting units E. Emergency exit signs 1.2 RELATED SECTIONS A. The lighting system design includes a combination of luminaire sources, lighting control components, programming sequences, and supplementary components for building and energy code compliance. The design uses performance-based specifications for portions of the lighting system to account for the limitation of comparable product solutions available by competitive manufacturers. The Contractor shall reference related specification sections, plans, schedules, and details prior to submitting pricing, submittals, and installation. The Contractor shall coordinate system component compatibility among various manufacturers and suppliers for a turnkey lighting system. Referenced sections include, but are not limited to, the following: 1. Electrical drawings: Plans, luminaire schedules, lighting control sequence of operations, diagrams, and details. 1.3 REFERENCES A. ANSI C78.377 - Specifications for the Chromaticity of Solid State Lighting Products B. ANSI C82.16 - Light-Emitting Diode Drivers - Method of Measurement C. ANSI C82.77 - Standard for Harmonic Emission Limits and Related Power Quality Requirements for Lighting Equipment D. NFPA 70E - National Electrical Safety Code E. NEMA SSL1 - Electronic Drivers for LED Devices, Arrays or System F. UL 8750 - Light Emitting Diode (LED) Equipment for use in Lighting Products G. LM-79 - Approved Method: Electrical and Photometric Measurements of Solid-State Lighting Products 938 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 51 19 - 2 LED LIGHTING H. LM-80 - Measuring Luminous Flux and Color Maintenance of LED I. FS W-L-305 - Light Set, General Illumination (Emergency or Auxiliary) J. UL 924 - Standard for Emergency Lighting and Power Equipment K. UL676 Standard for Underwater Luminaires and Submersible Junction Box L. Project site classification as defined in IESNA RP-33 LZ3. 1.4 SUBMITTALS A. Submit product data under provisions of Section 26 05 00. B. Basic Requirements of Submittal: 1. Submit product data sheets for luminaires, LED light engines, drivers and poles. Include complete product model number with all options as specified. Submittal shall be arranged with luminaires listed in ascending order, and with each luminaire's, LED light engine, driver, or pole information following luminaire's product data. Failure to organize submittal in this manner will result in the submittal being rejected. 2. Submit lens product data, dimensions and weights if not included in product data sheet submittal. 3. Include outline drawings, support points, weights, and accessory information for each luminaire. 4. Submit manufacturer origin of LED chipset and driver. C. LED Lighting - Performance Testing Submittal (when requested by Architect/Engineer): 1. IESNA LM-79: Include photometric report for the latest generation system being furnished. Provide name of independent testing laboratory, report number, date of test, luminaire series/model number, input wattage, and light source specifications. 2. IESNA LM-80: Measuring Lumen Maintenance of LED Light Sources. D. LED Lighting - Control Compatibility Submittal: 1. Submit lighting control capability data for each LED luminaire. The submittal shall clearly identify device data proposed by the Contractor and approved by the luminaire manufacturer for dimming, switching, addressable, wireless, and similar control characteristics. E. Submit Design Lights Consortium (DLC) information for each luminaire type. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver products to site. Store and protect under provisions of Section 26 05 00. B. Protect luminaire finishes, lenses, and trims from damage during storage and installation. Do not remove protective films until construction cleanup within each area is complete. 939 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 51 19 - 3 LED LIGHTING C. Handle site lighting poles carefully to prevent breakage and damage to finish. 1.6 MOCKUP A. Provide and install luminaires with power and control connections in mockup rooms as identified in Division 1. Approved luminaires in mockup may be reused as part of complete work if in original condition. 1.7 WARRANTY A. The warranty period begins at the date of Notice of Completion. B. LED Light Engines and Drivers: 1. LED Drivers and Dimming Drivers: Five (5) years 2. Light Emitting Diode (LED) Light Engines: Five (5) years C. Emergency Lighting Units and Exit Signs: 1. Emergency Lighting Units: Three (3) year, non-prorated 2. Exit Signs: Three (3) year, non-prorated 3. Emergency Unit and Exit Sign Battery: Sealed lead acid or lead calcium cell, requiring no maintenance or replacement for ten (10) years under normal conditions. 1.8 REGULATORY REQUIREMENTS A. Conform to NFPA 101 for installation requirements PART 2 - PRODUCTS 2.1 INTERIOR LUMINAIRES AND ACCESSORIES - GENERAL A. Lensed Troffers: Provide hinged frames with latches and 0.125-inch thick virgin acrylic lenses. Prismatic lenses shall have depth of no less than 0.080", KSH12 or equal. Other lenses as scheduled. B. Luminaires: Louvers shall be anodized low iridescent specular aluminum with mitered corners and interlocking construction. C. Suspended Luminaires: Coordinate power feed and suspension canopies with ceiling type and architectural RCP for proper fit and location. Ensure finished installations are plumb and level at elevations specified. Verify suspension length prior to submittal. D. Painted reflector surfaces shall have a minimum reflectance of 90%. E. All painted components shall be painted after fabrication. 2.2 EXTERIOR LUMINAIRES AND ACCESSORIES - GENERAL A. Listed for wet or damp location as scheduled. B. Provide low temperature LED drivers, with reliable starting to -20°F. 940 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 51 19 - 4 LED LIGHTING C. In-grade luminaires shall have lamp/optic separation to prevent surface temperature from exceeding 115°F. Compartment separation of wire entry and control gear/lamp chamber. D. Exterior LED luminaires shall contain separate, easily accessible and replaceable Category C surge protection device. 2.3 LIGHT EMITTING DIODE (LED) LUMINAIRE SYSTEMS A. Light emitting diodes used in interior applications shall have a minimum color rendering index (CRI) of 80. The R9 color rendering value shall be a minimum of 50. Light emitting diodes used in exterior applications shall have a minimum color rendering index (CRI) of 70. Color temperature of the luminaires shall be as noted on the luminaire schedule. Provide light source color consistency by utilizing a binning tolerance within a maximum 3-step McAdam ellipse unless noted otherwise. B. Refer to the luminaire schedule for color temperature and minimum color rendering index CRI requirements. Provide light source color consistency by utilizing a binning tolerance within a maximum 3-step McAdam ellipse unless noted otherwise. C. LED chip arrays specified as color changing shall have chip colors as noted on the luminaire schedule. D. Rated life shall be minimum of 50,000 hours at L70. E. LED chips shall be wired so that failure of one chip does not prohibit operation of the remainder of the chip array. F. Warm Dim LED (WLED): Variable warm dimming LED systems shall offer a range of temperature control from 3000K through 1800K. Color rendering index shall be a minimum of 80. Dimming control from 100% to 1%. Shall offer compatibility with any LED dimming driver/controller including 0-10V, DALI, DMX, etc. G. Luminaire delivered lumens is defined as the absolute lumens per the manufacturers LM-79-08 test report. H. LED luminaires shall be designed for ease of component replacement including modular replaceable boards or Zhaga sockets. Luminaires that are factory sealed and do not have field replaceable parts shall provide a 10-year warranty. I. LED light engine shall have a maximum LLD of 0.85 at 50,000 hours at 25°C ambient. J. LED Driver: 1. Solid state driver with integral heat sink. Driver shall have over-heat, short-circuit and overload protection, power factor 0.90 or above and maximum total harmonic distortion of 10%. Driver shall have a voltage fluctuation tolerance of +/- 10%. 2. Drivers shall have dimming capabilities as outlined in the luminaire schedule for each luminaire type. Dimming shall control light output in a continuous curve from 100% to 10% unless noted otherwise. 3. Driver shall have a minimum of 50,000 hours rated life. 941 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 51 19 - 5 LED LIGHTING 4. Driver shall be tested to ANSI C82-16 for input current inrush, total harmonic distortion (THD), and power factor. Driver start time shall be less than 0.5 seconds to 98% of initial light output. Flicker should be less than 30% throughout the operating range. 5. Driver shall be field replaceable without removal of the luminaire. 6. Class A sound rating; inaudible in a 27 dBA ambient. 7. Demonstrate no visible change in light output with a variation of plus or minus 10 percent change in line-voltage input. 2.4 LED EMERGENCY LIGHTING UNITS A. Self-Powered Emergency Lighting Units: One-piece, self-contained unit with sealed, maintenance-free nickel cadmium battery, automatic charger and electronic circuitry. Relay automatically energizes lamp from battery when circuit voltage drops to 80 percent of nominal voltage or below. When normal voltage is restored, relay disconnects lamps from battery, and battery is automatically recharged and floated on charger. B. Battery: Maintenance free lead calcium type, with 90 minute capacity to supply the connected lamp load. C. Charger: Dual-rate solid state charger, capable of maintaining the battery in a full- charge state during normal conditions, and capable of recharging discharged battery to full charged within 168 hours. Low voltage disconnect to prevent deep discharge of battery. D. LED Lamp Wattage: As scheduled on luminaire schedule. E. Remote Lamps: Match LED lamps on unit. F. Indicators: Provide lamps to indicate AC ON and RECHARGING. Provide voltmeter. G. Provide test switch to transfer unit from normal supply to battery supply. H. Electrical Connection: Knockout for conduit connection. I. Unit Voltage: Refer to luminaire schedule volts, AC. 2.5 EMERGENCY EXIT SIGNS A. Exit Signs: Stencil face, 6-inch high letters, directional arrows as indicated, universal mounting type as indicated on the drawings. B. Self-Powered Exit Signs: Stencil face, 6-inch high letters, directional arrows as indicated, universal mounting type as indicated on the drawings. One-piece, self- contained unit with sealed, maintenance-free nickel cadmium battery, test switch, AC ON pilot light, automatic charger, and electronic circuitry. Power failure relay automatically energizes lamp from battery when circuit voltage drops to 80 percent of nominal voltage or below. When normal voltage is restored, relay disconnects lamps from battery, and battery is automatically recharged and floated on charger. C. Directional Indicators: The directional indicator for exit signage shall be of a chevron type meeting all requirements of NFPA 101. 942 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 51 19 - 6 LED LIGHTING D. Self-Diagnostics and Testing: 1. Unit shall be self-diagnostic with continuous monitoring of charger performance and battery voltage. Any malfunction of battery, charger, transfer circuit, or emergency lamps shall be detected and visually indicated. 2. Unit shall be programmed to exercise the battery and test emergency operation by performing a five-minute discharge/diagnostic cycle every six months. A manual test switch shall allow a five minute discharge/diagnostic test at any time. PART 3 - EXECUTION 3.1 INSTALLATION A. Securely fasten luminaires to the listed and labeled ceiling framing member by mechanical means such as bolts, screws, rivets or listed clips identified for use with the type of ceiling framing members. 1. Install recessed flanged luminaires to permit removal from below. Use manufacturer-supplied plaster frames and swing gate supports. Provide independent support as follows: a. Luminaires less than 56 lbs: Provide a minimum of two (2) #12 gauge suspended ceiling support wires located on diagonal corners of the luminaires. b. Luminaires 56 lbs or greater: Provide a minimum of four (4) #12 gauge suspended ceiling support wires located on diagonal corners of the luminaires. Support luminaire independent of the ceiling system. c. Luminaires larger than eight square feet (8 ft2): Support luminaire independent of the ceiling system. B. Do not fasten luminaire supports to piping, ductwork, mechanical equipment, or conduit, unless otherwise noted. Support wires shall be tightly wrapped (minimum of three turns within 3 inches of the connection) and sharply bend to prevent vertical movement. C. Support suspended or pendant mounted luminaires independent of ceiling grid with adjustable stainless steel aircraft cables or per luminaire schedule mounting requirements. Suspension assembly and anchors shall be capable of supporting 300 pounds dead load at each suspension point. D. Support wire used to independently support luminaires, raceways, and wiring systems shall be distinguishable from ceiling support systems by color (field paint), tagging or equivalent means. E. Provide seismic bracing of luminaires per CBCChapter 16. Design pendant luminaires on a component seismic coefficient (Cc) of 0.67. Design vertical supports with a factor of safety of 4.0. Contractor shall verify the Seismic Hazard Exposure Group and Performance Criteria Factor. F. Install lamps in lamp holders of luminaires. 943 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 26 51 19 - 7 LED LIGHTING G. Adjust aimable luminaires to obtain lighting levels on objects and areas as directed to obtain desired lighting levels. H. Industrial Pendant Luminaires: Use power hook hangers rated 500 pounds minimum or provide safety chain between driver and structure. Provide safety chain between reflector and driver. I. Use belt slings or non-chafing ropes to raise and set pre-finished luminaire poles. 3.2 CONSTRUCTION USE OF PROJECT LUMINAIRES A. The Contractor shall provide temporary construction lighting per the requirements of Division 1. B. The project luminaires shown on the construction documents shall not be used for temporary construction purposes without providing a plan for Owner approval that addresses energy and luminaire operating hours. 3.3 EMERGENCY LIGHTING UNITS AND EXIT SIGNS A. Install units plumb and level. B. Aim directional lamp heads as directed. C. Test emergency lighting equipment for 60 minutes to determine proper operation, prior to Substantial Completion. Provide electronic copy of periodic test log form to Owner's Representative. Explain and instruct Owner's Representative of requirements for testing and maintenance. Refer to latest adopted NFPA 101 for testing and logging requirements. 3.4 RELAMPING A. Replace failed LED light engine modules or arrays at completion of work. 3.5 ADJUSTING AND CLEANING A. Align luminaires and clean lenses and diffusers at completion of work. Clean paint splatters, dirt, and debris from installed luminaires. B. Touch up luminaire and pole finish at completion of work. 3.6 LUMINAIRE SCHEDULE A. As shown on the drawings. END OF SECTION 26 51 19 944 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 1 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS SECTION 27 05 00 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Basic Communications Systems Requirements specifically applicable to Division 27 sections, in addition to Division 1 - General Requirements. B. All materials and installation methods shall conform to the applicable standards, guidelines and codes referenced herein and within each specification section. 1.2 REFERENCES A. CCR California Code of Regulation B. CBC California Building Code C. CFC California Fire Code D. CEC California Electric Code E. CMC California Mechanical Code F. CPC California Plumbing Code G. California Title 24 - Building Energy Efficiency Standards H. SCAQMD Southern California Air Quality Management Division 1.3 SCOPE OF WORK A. This Specification and the associated drawings govern furnishing, installing, testing and placing into satisfactory operation the Communications Systems. B. The Contractor shall furnish and install all new materials as indicated on the drawings, and/or in these specifications, and all items required to make the portion of the Communications Work a finished and working system. C. Description of Systems include, but are not limited to, the following: 1. Complete Structured Cabling System including, but not limited to: a. Voice and data backbone cabling and terminations. b. Voice and data horizontal cabling and terminations. c. Information outlets (IOs) including faceplates, jacks and labeling. d. Equipment racks, cabinets, cable management and equipment. e. Telecommunication Room equipment including patch panels, optical distribution cabinets, and termination blocks. 945 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 2 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS f. Cabling pathways. g. Grounding and Bonding h. Testing 2. Complete Data Communications Equipment Systems. 3. Complete Voice Communications Equipment Systems. 4. Complete Audio/Visual Systems. 5. Complete Paging Systems. 6. Mounting and patching of wireless access points provided by others. 7. Low Voltage Communications Wiring (less than +120VAC) as specified and required for proper system control and communications. 8. All associated electrical backboxes, conduit, miscellaneous cabling, and power supplies required for proper system installation and operation as defined in the "Suggested Matrix of Scope Responsibility". 9. Firestopping of penetrations as described in Division 7. 10. Seismic requirements as described in Section 26 05 48 "Seismic Requirements for Equipment and Supports". 1.4 DIVISION OF WORK BETWEEN ELECTRICAL AND COMMUNICATIONS CONTRACTORS A. Division of work is the responsibility of the Prime Contractor. Any scope of work described in the contract document shall be sufficient for including said requirement in the project. The Prime Contractor shall be solely responsible for determining the appropriate subcontractor for the described scope. In no case shall the project be assessed an additional cost for scope that is described in the contract documents. The following division of responsibility is a guideline based on typical industry practice. B. Definitions: 1. "Electrical Contractor" as referred to herein refers to the Contractors listed in Division 26 of this Specification. 2. "Electrical Contractor" shall also refer to the Contractor listed in Division 27 of this specification when the "Suggested Matrix of Scope Responsibility" indicates the work shall be provided by the EC. Refer to the Contract Documents for the "Suggested Matrix of Scope Responsibility". 3. "Technology Contractor" as referred to herein refers to the Contractors listed in Division 27 of this Specification. 4. Low Voltage Technology Wiring: The wiring (less than 120VAC) associated with the Technology Systems, used for analog and/or digital signals between equipment. 5. Telecommunications/Technology Rough-in: Relates specifically to the backboxes, necessary plaster rings and other miscellaneous hardware required for the installation and mounting of the telecommunications/technology outlet. Rough-in shall include conduit from the information outlet backbox to above the lay-in ceiling. Where surface mounted backboxes are required, conduit shall be routed to above the lay-in ceiling. 946 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 3 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS C. General: 1. The purpose of these specifications is to outline typical Electrical and Technology Contractor's work responsibilities as related to technology systems including telecommunications rough-in, audio/visual systems rough-in, conduit, cable tray, power wiring, and low voltage communications and technology wiring. The prime contractor is responsible for all divisions of work. 2. The exact wiring requirements for much of the equipment cannot be determined until the systems have been purchased and submittals are approved. Therefore, only known wiring, conduits, raceways, and electrical power as related to such items, is shown on the technology drawings. Other wiring, conduits, raceways, junction boxes, and electrical power not shown on the technology drawings but required for the successful operation of the systems shall be the responsibility of the Technology Contractor and included in the Contractor's bid. 3. Where the Electrical Contractor is required to install conduit, conduit sleeves and/or power connections in support of technology systems, the final installation shall not begin until a coordination meeting between the Electrical Contractor and the Technology Contractor has convened to determine the exact location and requirements of the installation. 4. Where the Electrical Contractor is required to install cable tray that will contain low voltage technology wiring, the installation shall not begin until the Technology Contractor has completed a coordination review of the cable tray shop drawing. 5. This Contractor shall establish electrical and technology utility elevations prior to fabrication and installation. The Technology Contractor shall cooperate with the Electrical Contractor and the determined elevations in accordance with the guidelines below. This Contractor shall coordinate utility elevations with other trades. When a conflict arises, priority shall be as follows: a. Lighting Fixtures b. Gravity Flow Piping, including Steam and Condensate c. Sheet Metal d. Electrical Busduct e. Cable Trays, including 12" access space f. Sprinkler Piping and other Piping g. Conduit and Wireway h. Open Cabling D. Electrical Contractor's Responsibility: 1. Assumes all responsibility for all required conduit and power connections when shown on the "Suggested Matrix of Scope Responsibility" to be provided by the Electrical Contractor. 2. Assumes all responsibility for providing and installing cable tray. 3. Responsible for Communications Systems grounding and bonding. 4. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. E. Technology Contractor's Responsibility: 1. Assumes all responsibility for the low voltage technology wiring of all systems, including cable support where open cable is specified. 947 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 4 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 2. Assumes all responsibility for all required backboxes, conduit and power connections not specifically shown as being provided by the Electrical Contractor on the "Suggested Matrix of Scope Responsibility." 3. Assumes all responsibility for providing and installing all ladder rack and other cable management hardware (as defined herein). 4. Responsible for providing the Electrical Contractor with the required grounding lugs or other hardware for each piece of technology equipment which is required to be bonded to the technology bonding system. 5. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. 1.5 COORDINATION DRAWINGS A. Definitions: 1. Coordination Drawings: A compilation of the pertinent layout and system drawings that show the sizes and locations, including elevations, of system components and required access areas to ensure that no two objects will occupy the same space. a. Mechanical trades shall include, but are not limited to, mechanical equipment, ductwork, fire protection systems, plumbing piping, steam and steam condensate piping, and any item that may impact coordination with other disciplines. b. Electrical trades shall include, but are not limited to, electrical equipment, conduit 1.5" and larger, conduit racks, cable trays, pull boxes, transformers, raceway, busway, lighting, ceiling-mounted devices, and any item that may impact coordination with other disciplines. c. Technology trades shall include, but are not limited to, technology equipment, racks, conduit 1.5" and larger, conduit racks, cable trays, ladder rack, pull boxes, raceway, ceiling-mounted devices, and any item that may impact coordination with other disciplines. d. Maintenance clearances and code-required dedicated space shall be included. e. The coordination drawings shall include all underground, underfloor, in- floor, in chase, and vertical trade items. 2. The contractors shall use the coordination process to identify the proper sequence of installation of all utilities above ceilings and in other congested areas, to ensure an orderly and coordinated end result, and to provide adequate access for service and maintenance. B. Participation: 1. The contractors and subcontractors responsible for work defined above shall participate in the coordination drawing process. 2. One contractor shall be designated as the Coordinating Contractor for purposes of preparing a complete set of composite electronic CAD coordination drawings that include all applicable trades, and for coordinating the activities related to this process. The Coordinating Contractor for this project shall be the Mechanical Contractor. 948 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 5 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS a. The Coordinating Contractor shall utilize personnel familiar with requirements of this project and skilled as draftspersons/CAD operators, competent to prepare the required coordination drawings. 3. Electronic CAD drawings shall be submitted to the Coordinating Contractor for addition of work by other trades. IMEG will provide electronic file copies of ventilation drawings for contractor's use if the contractor signs and returns an "Electronic File Transfer" waiver provided by IMEG. IMEG will not consider blatant reproductions of original file copies an acceptable alternative for coordination drawings. C. Drawing Requirements: 1. The file format and file naming convention shall be coordinated with and agreed to by all contractors participating in the coordination process and the Owner. a. Scale of drawings: 1) General plans: 1/4 Inch = 1 '-0" (minimum). 2) Mechanical, electrical, communication rooms, and including the surrounding areas within 10 feet: 1/2 Inch = 1'-0" (minimum). 3) Shafts and risers: 1/2 Inch = 1'-0" (minimum). 4) Sections of shafts and mechanical and electrical equipment rooms: 1/4 Inch = 1 '-0" (minimum). 5) Sections of congested areas: 1/2 Inch = 1'-0" (minimum). 2. Ductwork layout drawings shall be the baseline system for other components. Ductwork layout drawings shall be modified to accommodate other components as the coordination process progresses. 3. There may be more drawings required for risers and shafts. 4. The minimum quantity of drawings will be established at the first coordination meeting and sent to the A/E for review. Additional drawings may be required if other areas of congestion are discovered during the coordination process. D. General: 1. Coordination drawing files shall be made available to the A/E and Owner's Representative. The A/E will only review identified conflicts and give an opinion, but will not perform as a coordinator. 2. A plotted set of coordination drawings shall be available at the project site. 3. Coordination drawings are not shop drawings and shall not be submitted as such. 4. The contract drawings are schematic in nature and do not show every fitting and appurtenance for each utility. Each contractor is expected to have included in his/her bid sufficient fittings, material, and labor to allow for adjustments in routing of utilities made necessary by the coordination process and to provide a complete and functional system. 5. The contractors will not be allowed additional costs or time extensions due to participation in the coordination process. 949 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 6 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 6. The contractors will not be allowed additional costs or time extensions for additional fittings, reroutings or changes of duct size, that are essentially equivalent sizes to those shown on the drawings and determined necessary through the coordination process. 7. The A/E reserves the right to determine space priority of equipment in the event of spatial conflicts or interference between equipment, piping, conduit, ducts, and equipment provided by the trades. 8. Changes to the contract documents that are necessary for systems installation and coordination shall be brought to the attention of the A/E. 9. Access panels shall preferably occur only in gypsum board walls or plaster ceilings where indicated on the drawings. a. Access to mechanical, electrical, technology, and other items located above the ceiling shall be through accessible lay-in ceiling tile areas. b. Potential layout changes shall be made to avoid additional access panels. c. Additional access panels shall not be allowed without written approval from the A/E at the coordination drawing stage. d. Providing additional access panels shall be considered after other alternatives are reviewed and discarded by the A/E and the Owner's Representative. e. When additional access panels are required, they shall be provided without additional cost to the Owner. 10. Complete the coordination drawing process and obtain signoff of the drawings by all contractors prior to installing any of the components. 11. Conflicts that result after the coordination drawings are signed off shall be the responsibility of the contractor or subcontractor who did not properly identify their work requirements, or installed their work without proper coordination. 12. Updated coordination drawings that reflect as-built conditions may be used as record documents. 1.6 QUALITY ASSURANCE A. Telecommunications Structured Cabling System Standards: 1. All work and equipment shall conform to the most current ratified version of the following published standards unless otherwise indicated that draft standards are to be followed: a. ANSI/NECA/BICSI 568 - Standard for Installing Commercial Building Telecommunications Cabling b. ANSI/TIA-568-C.0 - Generic Telecommunications Cabling for Customer Premises 1) C.1 - Commercial Building Telecommunications Standard 2) C.2 - Balanced Twisted-Pair Telecommunications Cabling and Components Standard 3) C.3 - Optical Fiber Cabling Components Standard 4) C.4 - Broadband Coaxial Cabling and Components Standard c. ANSI/TIA-569-C - Telecommunications Pathways and Spaces 950 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 7 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS d. ANSI/TIA-606-B - Administration Standard for Commercial Telecommunications Infrastructure e. ANSI/TIA-607-B - Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications f. ANSI/TIA-1152 - Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling g. ANSI/TIA/EIA-598-C - Optical Fiber Cable Color Coding h. NFPA 70 (NEC) - National Electrical Code (Current Edition) i. UL 444 - Standard for Safety for Communications Cable j. California Electrical Code Article 725 B. Refer to individual sections for additional Quality Assurance requirements. C. Qualifications: 1. Only products of reputable manufacturers as determined by the Architect/Engineer will be acceptable. 2. The installing Contractor shall be certified by the manufacturer of the structured cabling system. Certification of Contractor shall have been in place for a minimum of one (1) year prior to bidding this project. Documentation of certification is required at the time of bid. Shop drawings will not be approved until proof of certification is submitted. Refer to the end of this specification section for certification documentation requirements. 3. Each Contractor and their subcontractors shall employ only workers who are skilled in their respective trades and fully trained. All workers involved in the termination of cabling shall be individually certified by the manufacturer. 4. The Contractor shall be experienced in all aspects of this work and shall be required to demonstrate direct experience on recent systems of similar type and size. 5. The Contractor shall own and maintain tools and equipment necessary for successful installation and testing of optical and copper structured cabling systems and have personnel adequately trained in the use of such tools and equipment. 6. The Contractor shall have certified BICSI installation technicians on staff to perform the following tasks on the project: a. Act as the field superintendent or job foreman with the responsibility of monitoring the daily work of each technician. b. Oversee all testing and termination of cabling. 7. The Contractor shall have certified BICSI Installer 2 on staff to perform the following tasks: a. Installation and termination of copper cable. b. Installation and termination of optical fiber. 8. A resume of qualification shall be submitted with the Contractor's bid indicating the following: a. Documentation of certification of This Contractor by the proposed structured cabling system manufacturer as required at the end of this specification section. 951 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 8 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS D. Compliance with Codes, Laws, Ordinances: 1. Conform to all requirements of the State of California Codes, Laws, Ordinances and other regulations having jurisdiction. 2. In the event there are no local codes having jurisdiction over this job, the current issue of the National Electrical Code shall be followed. 3. If there is a discrepancy between the codes and regulations having jurisdiction over this installation, and these specifications, Architect/Engineer shall determine the method or equipment used. 4. If the Contractor notes, at the time of bidding, any parts of the drawings and specifications which are not in accordance with the applicable codes or regulations, he shall inform the Architect/Engineer in writing, requesting a clarification. If there is insufficient time to follow this procedure, he shall submit with the proposal, a separate price required to make the system shown on the drawings comply with the codes and regulations. 5. Verify the installation environment prior to purchasing or installing any cable. Cable installed in a plenum environment shall be appropriately rated. Bring all discrepancies between the contract documents and installation conditions to the attention of the Architect/Engineer prior to purchase or installation. 6. All changes to the system made after the letting of the contract, in order to comply with the applicable codes or the requirements of the Inspector, shall be made by the Contractor without cost to the Owner. E. Permits, Fees, Taxes, Inspections: 1. Procure all applicable permits and licenses. 2. Abide by all applicable laws, regulations, ordinances, and other rules of the State or Political Subdivision wherein the work is done, or as required by any duly constituted public authority. 3. Pay all applicable charges for such permits or licenses that may be required. 4. Pay all applicable fees and taxes imposed by the State, Municipal and/or other regulatory bodies. 5. Pay all charges arising out of required inspections due to codes, permits, licenses or as otherwise may be required by an authorized body as applicable. 6. Pay all charges arising out of required contract document reviews associated with the project and as initiated by the Owner or authorized independent agency/consultant as applicable. 7. Pay any charges by the service provider related to the service or change in service to the project. 8. All equipment and materials shall be as approved or listed by the following (unless approval or listing is not applicable to an item by all acceptable manufacturers): a. Factory Mutual b. Underwriters' Laboratories, Inc. F. Service Provider Requirements: 1. Secure from the telecommunications service provider all applicable requirements. 2. Comply with all service provider requirements. 952 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 9 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS G. Examination of Drawings: 1. The drawings for the technology systems work are diagrammatic, intended to convey the scope of the work and to indicate the general arrangements and locations of equipment etc., and the approximate sizes of equipment. 2. Contractor shall determine the exact locations of equipment and the exact routing of cabling to best fit the layout of the job. Scaling of the drawings will not be sufficient or accurate for determining this layout. Where a specific route is required, such route will be indicated on the drawings. 3. Where job conditions require reasonable changes in indicated arrangements and locations, such changes shall be made by the Contractor at no additional cost to the Owner. 4. If an item is either shown on the drawings, called for in the specifications or required for proper operation of the system, it shall be considered sufficient for including same in this contract. 5. The determination of quantities of material and equipment required shall be made by the Contractor from the drawings. Schedules on the drawings and in the specifications are completed as an aid to the Contractor but where discrepancies arise, the greater number shall govern. 6. Where words "provide", "install", or "furnish" are used on the drawings or in the specifications, it shall be taken to mean, to furnish, install and terminate completely ready for operation, the items mentioned. H. Electronic Media/Files: 1. Construction drawings for this project have been prepared utilizing Revit. 2. Contractors and Subcontractors may request electronic media files of the contract drawings and/or copies of the specifications. Specifications will be provided in PDF format. 3. Upon request for electronic media, the Contractor shall complete and return a signed "Electronic File Transmittal" form provided by IMEG.If the information requested includes floor plans prepared by others, the Contractor will be responsible for obtaining approval from the appropriate Design Professional for use of that part of the document. 4. The electronic contract documents can be used for preparation of shop drawings and as-built drawings only. The information may not be used in whole or in part for any other project. 5. The drawings prepared by IMEG for bidding purposes may not be used directly for ductwork layout drawings or coordination drawings. 6. The use of these CAD documents by the Contractor does not relieve them from their responsibility for coordination of work with other trades and verification of space available for the installation. 7. The information is provided to expedite the project and assist the Contractor with no guarantee by IMEG as to the accuracy or correctness of the information provided. IMEG accepts no responsibility or liability for the Contractor's use of these documents. 8. The use of these documents by the Contractor does not relieve them from their responsibility for coordination of work with other trades and verification of space available for the installation. 953 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 10 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS I. Field Measurements: 1. Before ordering any materials, this Contractor shall verify all pertinent dimensions at the job site and be responsible for their accuracy. 2. Field conditions that will result in telecommunications drops that exceed the length limitations identified in the contract documents shall be brought to the attention of the Architect/Engineer prior to installation. The cost of reworking cabling that is too long, that was not brought to the written attention of the Architect/Engineer will be borne entirely by the Contractor. 3. This Contractor shall provide the Architect/Engineer with written documentation of any cabling drops that will not be able to use the cable tray (where cable tray is available) due to the resulting cabling lengths. This documentation shall be submitted prior to installation and installation shall not commence until approved by the Architect/Engineer. 1.7 SUBMITTALS A. Submittals shall be required for the following items, and for additional items where required elsewhere in the specifications or on the drawings. 1. Submittals list: Referenced Specification Section Submittal Item 27 05 03 Through Penetration Firestopping 27 05 26 Communications Bonding 27 05 28 Interior Communications Pathways 27 05 53 Identification and Administration 27 11 00 Communication Equipment Rooms 27 13 00 Backbone Cabling Requirements 27 15 00 Horizontal Cabling Requirements 27 17 10 Testing 27 41 00 Professional Audio Video System B. General Submittal Procedures: In addition to the provisions of Division 1, the following are required: 1. Transmittal: Each transmittal shall include the following: a. Date b. Project title and number c. Contractor's name and address d. Description of items submitted and relevant specification number e. Notations of deviations from the contract documents f. Other pertinent data 2. Submittal Cover Sheet: Each submittal shall include a cover sheet containing: a. Date b. Project title and number 954 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 11 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS c. Architect/Engineer d. Contractor and subcontractors' names and addresses e. Supplier and manufacturer's names and addresses f. Description of item submitted (using project nomenclature) and relevant specification number g. Notations of deviations from the contract documents h. Other pertinent data i. Provide space for Contractor's review stamps 3. Composition: a. Submittals shall be submitted using specification sections and the project nomenclature for each item. b. Individual submittal packages shall be prepared for items in each specification section. All items within a single specification section shall be packaged together where possible. An individual submittal may contain items from multiple specifications sections if the items are intimately linked (e.g., pumps and motors). c. All sets shall contain an index of the items enclosed with a general topic description on the cover. 4. Content: Submittals shall include all fabrication, erection, layout, and setting drawings; manufacturers' standard drawings; schedules; descriptive literature, catalogs and brochures; performance and test data; wiring and control diagrams; dimensions; shipping and operating weights; shipping splits; service clearances; and all other drawings and descriptive data of materials of construction as may be required to show that the materials, equipment or systems and the location thereof conform to the requirements of the contract documents. 5. Contractor's Approval Stamp: a. The Contractor shall thoroughly review and approve all shop drawings before submitting them to the Architect/Engineer. The Contractor shall stamp, date and sign each submittal certifying it has been reviewed. b. Unstamped submittals will be rejected. c. The Contractor's review shall include, but not be limited to, verification of the following: 1) Only approved manufacturers are used. 2) Addenda items have been incorporated. 3) Catalog numbers and options match those specified. 4) Performance data matches that specified. 5) Electrical characteristics and loads match those specified. 6) Equipment connection locations, sizes, capacities, etc. have been coordinated with other affected trades. 7) Dimensions and service clearances are suitable for the intended location. 8) Equipment dimensions are coordinated with support steel, housekeeping pads, openings, etc. 9) Constructability issues are resolved (e.g., weights and dimensions are suitable for getting the item into the building and into place, sinks fit into countertops, etc.). 955 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 12 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS d. The Contractor shall review, stamp and approve all subcontractors' submittals as described above. e. The Contractor's approval stamp is required on all submittals. Approval will indicate the Contractor's review of all material and a complete understanding of exactly what is to be furnished. Contractor shall clearly mark all deviations from the contract documents on all submittals. If deviations are not marked by the Contractor, then the item shall be required to meet all drawing and specification requirements. 6. Submittal Identification and Markings: a. The Contractor shall clearly mark each item with the same nomenclature applied on the drawings or in the specifications. b. The Contractor shall clearly indicate the size, finish, material, etc. c. Where more than one model is shown on a manufacturer's sheet, the Contractor shall clearly indicate exactly which item and which data is intended. d. All marks and identifications on the submittals shall be unambiguous. 7. Schedule submittals to expedite the project. Coordinate submission of related items. 8. Identify variations from the contract documents and product or system limitations that may be detrimental to the successful performance of the completed work. 9. Reproduction of contract documents alone is not acceptable for submittals. 10. Incomplete submittals will be rejected without review. Partial submittals will only be reviewed with prior approval from the Architect/Engineer. 11. Submittals not required by the contract documents may be returned without review. 12. The Architect/Engineer's responsibility shall be to review one set of shop drawing submittals for each product. If the first submittal is incomplete or does not comply with the drawings and/or specifications, the Contractor shall be responsible to bear the cost for the Architect/Engineer to recheck and handle the additional shop drawing submittals. 13. Submittals shall be reviewed and approved by the Architect/Engineer before releasing any equipment for manufacture or shipment. 14. Contractor's responsibility for errors, omissions or deviation from the contract documents in submittals is not relieved by the Architect/Engineer's approval. 15. Schedule shall allow for adequate time to perform orderly and proper review of submittals, including time for consultants and Owner if required, and resubmittals by Contractor if necessary, and to cause no delay in Work or in activities of Owner or other contractors. a. Allow at least two weeks for Architect's/Engineer's review and processing of each submittal. 16. Architect/Engineer reserves the right to withhold action on a submittal which, in the Architect/Engineer's opinion, requires coordination with other submittals until related submittals are received. The Architect/Engineer will notify the Contractor, in writing, when they exercise this right. C. Electronic Submittal Procedures: 956 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 13 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 1. Distribution: Email submittals as attachments to all parties designated by the Architect/Engineer, unless a web-based submittal program is used. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. Submittal file name: 27 XX XX.description.YYYYMMDD b. Transmittal file name: 27 XX XX.description.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 1.8 EQUIPMENT SUPPLIERS' INSPECTION A. The following equipment shall not be placed in operation until a representative of the manufacturer has inspected the installation and certified that the equipment is properly installed and that the equipment is ready for operation: 1. Firestopping, including mechanical firestop systems. 1.9 PRODUCT DELIVERY, STORAGE, HANDLING & MAINTENANCE A. Exercise care in transporting and handling to prevent damage to fixtures, equipment and materials. B. Store materials on the site to prevent damage. C. Keep fixtures, equipment and materials clean, dry and free from deleterious conditions. 1.10 NETWORK / INTERNET CONNECTED EQUIPMENT A. These specifications may require certain equipment or systems to have network, Internet and/or remote access capability ("Network Capability"). Any requirement for Network Capability shall be interpreted only as a functional capability and is not to be construed as authority to connect or enable any Network Capability. Network Capability may only be connected or enabled with the express written consent of the Owner. 1.11 WARRANTY A. At a minimum, provide a one (1) year warranty for all equipment, materials, and workmanship. Individual specifications sections within Division 27 may require additional warranty requirements for specific equipment or systems. 957 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 14 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS B. The warranty period for the entire installation described in this Division of the specifications shall commence on the date of substantial completion unless a whole or partial system or any separate piece of equipment or component is put into use for the benefit of any party other than the installing contractor with prior written authorization. In this instance, the warranty period shall commence on the date when such whole system, partial system or separate piece of equipment or component is placed in operation and accepted in writing by the Owner or their representative. C. Warranty requirements shall extend to correction, without cost to the final user, of all work and/or equipment found to be defective or nonconforming to the contract documents. The Contractor shall bear the cost of correcting all damage resulting from such defects or nonconformance with contract documents exclusive of repairs required as a result of improper maintenance or operation, or of normal wear as determined by the Architect/Engineer. 1.12 INSURANCE A. Contractor shall maintain insurance coverage per city front end requirements. PART 2 - PRODUCTS 2.1 CABLE JACKET RATING A. This project does not require all cable jackets to carry a plenum rating. 2.2 Refer to individual sections. PART 3 - EXECUTION 3.1 JOBSITE SAFETY A. Neither the professional activities of the Architect/Engineer, nor the presence of the Architect/Engineer or his or her employees and subconsultants at a construction site, shall relieve the Contractor and any other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions of the work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Architect/Engineer and his or her personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The Contractor is solely responsible for jobsite safety. The Architect/Engineer and the Architect/Engineer's consultants shall be indemnified and shall be made additional insureds under the Contractor's general liability insurance policy. 958 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 15 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 3.2 GENERAL INSTALLATION REQUIREMENTS A. Installation of all conduit and cabling shall comply with Sections 26 05 33 and 26 05 13. Additional conduit requirements described within this Division shall be supplemental to the requirement described in Section 26 05 33. Should conflicts exist between the two Divisions the more stringent (more expensive material and labor) condition shall prevail until bidding addendum or construction clarification or RFI can be submitted and responded to. In no case shall the Contractor carry the least stringent condition in the pricing. B. It is the Contractor's responsibility to survey the site and include all necessary costs to perform the installation as specified. C. The Contractor shall be responsible for identifying and reporting to the Architect/Engineer any existing conditions including but not limited to damage to walls, flooring, ceiling and furnishings prior to start of work. All damage to interior spaces caused by this Contractor shall be repaired at this Contractor's expense to pre-existing conditions, including final colors and finishes. D. All cables and devices installed in damp or wet locations, including any underground or underslab location, shall be listed as suitable for use in such environments. Follow manufacturer's recommended installation practices for installing cables and devices in damp or wet locations. Any cable or device that fails as a result of being installed in a damp or wet location shall be replaced at the Contractor's expense. 3.3 FIELD QUALITY CONTROL A. General: 1. Refer to specific Division 27 sections for further requirements. 2. The Contractor shall conduct all tests required and applicable to the work both during and after construction of the work. 3. The necessary instruments and materials required to conduct or make the tests shall be supplied by the Contractor who shall also supply competent personnel for making the tests who has been schooled in the proper testing techniques. 4. In the event the results obtained in the tests are not satisfactory, This Contractor shall make such adjustments, replacements and changes as are necessary and shall then repeat the test or tests which disclose faulty or defective work or equipment, and shall make such additional tests as the Architect/Engineer or code enforcing agency deems necessary. 5. All communications cable tests that fail, including those due to excessive cabling lengths, shall be remedied by the Contractor without cost to the project. B. Protection of cable from foreign materials: 1. It is the Contractor's responsibility to provide adequate physical protection to prevent foreign material application or contact with any cable type. Foreign material is defined as any material that would negatively impact the validity of the manufacturer's performance warranty. This includes, but is not limited, to overspray of paint (accidental or otherwise), drywall compound, or any other surface chemical, liquid or compound that could come in contact with the cable, cable jacket or cable termination components. 959 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 16 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 2. Application of foreign materials of any kind on any cable, cable jacket or cable termination component will not be accepted. It shall be the Contractor's responsibility to replace any component containing overspray, in its entirety, at no additional cost to the project. Cleaning of the cables with harsh chemicals is not allowed. This requirement is regardless of the PASS/FAIL test results of the cable containing overspray. Should the manufacturer and warrantor of the structured cabling system desire to physically inspect the installed condition and certify the validity of the structured cabling system (via a signed and dated statement by an authorized representative of the structured cabling manufacturer), the Owner may, at their sole discretion, agree to accept said warranty in lieu of having the affected cables replaced. In the case of plenum cabling, in addition to the statement from the manufacturer, the Contractor shall also present to the Owner a letter from the local Authority Having Jurisdiction stating that they consider the plenum rating of the cable to be intact and acceptable. 3.4 PROJECT CLOSEOUT A. Refer to the Division 1 Section: PROJECT CLOSEOUT for requirements. The following paragraphs supplement the requirements of Division 1. B. Final Jobsite Observation: 1. The Architect/Engineer will not perform a final jobsite observation until the project is ready. This is not dictated by schedule, but rather by completeness of the project. 2. Refer to the end of this specification section for a "STATEMENT INDICATING READINESS FOR FINAL JOBSITE OBSERVATION." 3. The Contractor shall sign this form and return it to the Architect/Engineer so that the final observation can commence. C. Before final payment will be authorized, this Contractor must have completed the following: 1. Submitted operation and maintenance manuals to the Architect/Engineer for review. 2. Submitted bound copies of approved shop drawings. 3. Record documents including edited drawings and specifications accurately reflecting field conditions, inclusive of all project revisions, change orders, and modifications. 4. Submitted a report stating the instructions given to the Owner's representative complete with the number of hours spent in the instruction. The report shall bear the signature of an authorized agent of This Contractor and shall be signed by the Owner's representative as having received the instructions. 5. Submitted testing reports for all systems requiring final testing as described herein. 6. Submitted start-up reports on all equipment requiring a factory installation inspection and/or start. 7. Provide System Assurance Warranty certificate for the telecommunications system. 960 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 17 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 3.5 OPERATION AND MAINTENANCE MANUALS A. General: 1. Provide an electronic copy of the O&M manuals as described below for Architect/Engineer's review and approval. The electronic copy shall be corrected as required to address the Architect/Engineer's comments. Once corrected, electronic copies and paper copies shall be distributed as directed by the Architect/Engineer. 2. Approved O&M manuals shall be completed and in the Owner's possession prior to Owner's acceptance and at least 10 days prior to instruction of operating personnel. B. Electronic Submittal Procedures: 1. Distribution: Email the O&M manual as attachments to all parties designated by the Architect/Engineer. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. O&M file name: O&M.div27.contractor.YYYYMMDD b. Transmittal file name: O&Mtransmittal.div27.contractor.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 6. Provide the Owner with an approved copy of the O&M manual on compact discs (CD), digital video discs (DVD), or flash drives with a permanently affixed label, printed with the title "Operation and Maintenance Instructions", title of the project and subject matter of disc/flash drive when multiple disc/flash drives are required. 7. All text shall be searchable. 8. Bookmarks shall be used, dividing information first by specification section, then systems, major equipment and finally individual items. All bookmark titles shall include the nomenclature used in the construction documents and shall be an active link to the first page of the section being referenced. C. Operation and Maintenance Instructions shall include: 1. Title Page: Include title page with project title, Architect, Engineer, Contractor, all subcontractors, and major equipment suppliers, with addresses, telephone numbers, website addresses, email addresses and point of contacts. Website URLs and email addresses shall be active links in the electronic submittal. 2. Table of Contents: Include a table of contents describing specification section, systems, major equipment, and individual items. 961 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 18 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 3. Copies of all final approved shop drawings and submittals. Include Architect's/Engineer's shop drawing review comments. Insert the individual shop drawing directly after the Operation and Maintenance information for the item(s) in the review form. 4. Copy of final approved test and balance reports. 5. Copies of all factory inspections and/or equipment startup reports. 6. Copies of warranties. 7. Schematic wiring diagrams of the equipment that have been updated for field conditions. Field wiring shall have label numbers to match drawings. 8. Dimensional drawings of equipment. 9. Capacities and utility consumption of equipment. 10. Detailed parts lists with lists of suppliers. 11. Operating procedures for each system. 12. Maintenance schedule and procedures. Include a chart listing maintenance requirements and frequency. 13. Repair procedures for major components. 14. List of lubricants in all equipment and recommended frequency of lubrication. 15. Instruction books, cards, and manuals furnished with the equipment. 3.6 INSTRUCTING THE OWNER'S REPRESENTATIVE A. Adequately instruct the Owner's designated representative or representatives in the maintenance, care, and operation of the complete systems installed under this contract. B. Provide verbal and written instructions to the Owner's representative or representatives by FACTORY PERSONNEL in the care, maintenance, and operation of the equipment and systems. C. The Owner has the option to make a video recording of all instructions. Coordinate schedule of instructions to facilitate this recording. D. The Architect/Engineer shall be notified of the time and place for the verbal instructions to be given to the Owner's representative so that their representative can be present if desirable. E. Refer to the individual specification sections for minimum hours of instruction time for each system. F. Operating Instructions: 1. The Contractor is responsible for all instructions to the Owner and/or Owner's operating staff on the Communications Systems. 962 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 19 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 3.7 SYSTEM STARTING AND ADJUSTING A. The Communications Systems included in the construction documents are to be complete and operating systems. The Architect/Engineer will make periodic job site observations during the construction period. The system start-up, testing, configuration, and satisfactory system performance is the responsibility of the Contractor. This shall include all calibration and adjustments of electrical equipment controls, equipment settings, software configuration, troubleshooting and verification of software, and final adjustments that may be required. B. All operating conditions and control sequences shall be simulated and tested during the start-up period. 3.8 RECORD DOCUMENTS A. Refer to the Division 1 Section: PROJECT CLOSEOUT for requirements. The following paragraphs supplement the requirements of Division 1. B. Mark specifications to indicate approved substitutions, change orders, and actual equipment and materials used. C. This Contractor shall maintain at the job site, a separate and complete set of technology drawings which shall be clearly and permanently marked and noted in complete detail any changes made to the location and arrangement of equipment or made to the Technology Systems and wiring as a result of building construction conditions or as a result of instructions from the Architect or Engineer. All Change Orders, RFI responses, Clarifications and other supplemental instructions shall be marked on the documents. Record documents that merely reference the existence of the above items are not acceptable. Should This Contractor fail to complete Record Documents as required by this contract, This Contractor shall reimburse Architect/Engineer for all costs to develop record documents that comply with this requirement. Reimbursement shall be made at the Architect/Engineer's hourly rates in effect at the time of work. D. Record actual routing of all conduits sized 2" or larger. E. The above record of changes shall be made available for the Architect and Engineer's examination during any regular work time. F. Upon completion of the job, and before final payment is made, This Contractor shall give the marked-up drawings to the Architect/Engineer. 3.9 ADJUST AND CLEAN A. Contractor shall thoroughly clean all equipment and systems prior to the Owner's final acceptance of the project. B. Contractor shall clean all foreign paint, grease, oil, dirt, labels, stickers, and other foreign material from equipment. C. Contractor shall remove all rubbish, debris, etc., accumulated during the Contractor's operations from the premises. 963 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 00 - 20 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS 3.10 SPECIAL REQUIREMENTS A. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards:CDPH Standard Method V1.1- 2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 1. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. B. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. END OF SECTION 27 05 00 964 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 03 - 1 THROUGH PENETRATION FIRESTOPPING SECTION 27 05 03 THROUGH PENETRATION FIRESTOPPING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Through-Penetration Firestopping. 1.2 QUALITY ASSURANCE A. Manufacturer: Company specializing in manufacturing products specified in this Section. B. Installer: Individuals performing work shall be certified by the manufacturer of the system selected for installation. 1.3 REFERENCES A. UL 263 - Fire Tests of Building Construction and Materials B. UL 723 - Surface Burning Characteristics of Building Materials C. ANSI/UL 1479 - Fire Tests of Through Penetration Firestops D. UL 2079 - Tests for Fire Resistance of Building Joint Systems E. UL Fire Resistance Directory Through Penetration Firestop Systems (XHEZ) F. Intertek / Warnock Hersey - Directory of Listed Products G. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials H. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops I. CBC California Building Code J. The Building Officials and Code Administrators National Building Code K. 2018 International Building Code L. NFPA 5000 – Building Construction Safety Code 1.4 SUBMITTALS A. Submit under provisions of Division 1. 965 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 03 - 2 THROUGH PENETRATION FIRESTOPPING B. Submit Firestopping Installers Certification for all installers on the project. C. Shop Drawings: Submit for each condition requiring firestopping. Include descriptions of the specific penetrating item, actual wall/floor construction, manufacturer's installation instructions, and UL or Intertek / Warnock Hersey Assembly number. D. Through-Penetration Firestop System Schedule: Indicate locations of each through- penetration firestop system, along with the following information: 1. Types of penetrating items. 2. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated. 3. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency. 4. F ratings for each firestop system. E. Maintain a notebook on the job site at all times that contains copies of approved submittals for all through penetration firestopping to be installed. Notebook shall be made available to the Authority Having Jurisdiction at their request and turned over to the Owner at the end of construction as part of the O&M Manuals. F. Submit VOC rating of firestopping material in g/L (less water) with documentation that it meets the limits set forth in SCAQMD Rule 1168. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store, protect and handle products on site. Accept material on site in factory containers and packing. Inspect for damage. Protect from deterioration or damage due to moisture, temperature changes, contaminants, or other causes. Follow manufacturer's instructions for storage. B. Install material prior to expiration of product shelf life. 1.6 PERFORMANCE REQUIREMENTS A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. 1. Fire-resistance-rated walls including fire partitions/barriers. B. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per UL 1479: 1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated. 2. L-Rated Systems: Provide through-penetration firestop systems with L-ratings of not more than 5.0 cfm/sq.ft. at both ambient temperature and 400°F. 966 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 03 - 3 THROUGH PENETRATION FIRESTOPPING C. For through-penetration firestop systems exposed to light, traffic, moisture, or physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. D. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84. E. For through-penetration firestop systems in air plenums, provide products with flame- spread and smoke-developed indexes of less than 25 and 50, respectively, as determined per ASTM E 84. 1. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 1.7 WARRANTY A. Provide one year warranty on parts and labor. B. Warranty shall cover repair or replacement of firestop systems which fail in joint adhesion, cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, general durability, or appear to deteriorate in any manner not clearly specified by the manufacturer as an inherent quality of the material. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Products: Subject to compliance with requirements, provide one of the through- penetration firestop systems indicated for each application that are produced by one of the following manufacturers. All firestopping systems installed shall be provided by a single manufacturer. 1. 3M; Fire Protection Products Division 2. Hilti, Inc. 3. RectorSeal Corporation, Metacaulk 4. Tremco; Sealant/Weatherproofing Division 5. Johns-Manville 6. Specified Technologies Inc. (S.T.I.) 7. Spec Seal Firestop Products 967 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 03 - 4 THROUGH PENETRATION FIRESTOPPING 8. AD Firebarrier Protection Systems 9. Wiremold/Legrand: FlameStopper 10. Dow Corning Corp 11. Fire Trak Corp 12. International Protective Coating Corp 2.2 THROUGH PENETRATION FIRESTOP SYSTEMS A. Provide materials and systems classified by or listed by Intertek / Warnock Hersey to provide firestopping equal to time rating of construction being penetrated. B. All firestopping materials shall be free of asbestos, lead, PCB's, and other materials that would require hazardous waste removal. C. Firestopping shall be flexible to allow for normal penetrating item movement due to expansion and contraction. D. Firestopping systems for plumbing and wet pipe sprinkler piping shall be moisture resistant. E. Provide firestopping systems capable of supporting floor loads where systems are exposed to possible floor loading or traffic. F. Provide firestopping systems allowing continuous insulation for all insulated pipes. G. Provide firestopping systems classified by UL or listed by Intertek / Warnock Hersey for penetrations through all fire rated construction. Firestopping systems shall be selected from the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory Category XHEZ based on substrate construction and penetrating item size and material and shall fall within the range of numbers listed: 1. Combustible Framed Floors and Chase Walls - 1 or 2 Hour Rated: a. F Rating = Floor/Wall Rating b. L Rating = Penetrations in Smoke Barriers Penetrating Item UL System No. No Penetrating Item FC 0000-0999* Metallic Pipe or Conduit FC 1000-1999 Non-Metallic Pipe or Conduit FC 2000-2999 Electrical Cables FC 3000-3999 Cable Trays FC 4000-4999 Insulated Pipes FC 5000-5999 Bus Duct and Misc. Electrical FC 6000-6999 Duct without Damper and Misc. Mechanical FC 7000-7999 Multiple Penetrations FC 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. 968 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 03 - 5 THROUGH PENETRATION FIRESTOPPING 2. Non-Combustible Framed Walls - 1 or 2 Hour Rated: a. F Rating = Wall Rating b. L Rating = Penetrations in Smoke Barriers Penetrating Item UL System No. No Penetrating Item WL 0000-0999* Metallic Pipe or Conduit WL 1000-1999 Non-Metallic Pipe or Conduit WL 2000-2999 Electrical Cables WL 3000-3999 Cable Trays WL 4000-4999 Insulated Pipes WL 5000-5999 Bus Duct and Misc. Electrical WL 6000-6999 Duct without Damper and Misc. Mechanical WL 7000-7999 Multiple Penetrations WL 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. 3. Concrete Floors and Walls - 1 or 2 Hour Rated: a. F Rating = Wall/Floor Rating b. L Rating = Penetrations in Smoke Barriers Penetrating Item UL System No. No Penetrating Item CAJ 0000-0999* Metallic Pipe or Conduit CAJ 1000-1999 Non-Metallic Pipe or Conduit CAJ 2000-2999 Electrical Cables CAJ 3000-3999 Cable Trays CAJ 4000-4999 Insulated Pipes CAJ 5000-5999 Bus Duct and Misc. Electrical CAJ 6000-6999 Duct without Damper and Misc. Mechanical CAJ 7000-7999 Multiple Penetrations CAJ 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. H. Any opening in walls or floors not covered by the listed series of numbers shall be coordinated with the firestopping manufacturer. I. Any openings in floors or walls not described in the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory, or outlined in manufacturer's information shall be sealed in a manner agreed upon by the Firestopping Manufacturer, Owner, and the Authority Having Jurisdiction. 969 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 03 - 6 THROUGH PENETRATION FIRESTOPPING PART 3 - EXECUTION 3.1 EXAMINATION A. Ensure all surfaces that contact seal materials are free of dirt, dust, grease, oil, rust, or loose materials. Clean and repair surfaces as required. Remove laitance and form- release agents from concrete. B. Ensure substrate and penetrating items have been permanently installed prior to installing firestopping systems. Ensure penetrating items have been properly spaced and have proper clearance prior to installing firestopping systems. C. Surfaces to which sealing materials are to be installed must meet the selected UL or Intertek / Warnock Hersey system substrate criteria. D. Prime substrates where recommended in writing by through-penetration firestop system manufacturer. Confine primer to area of bond. 3.2 INSTALLATION A. In existing construction, provide firestopping of openings prior to and after installation of penetrating items. Remove any existing coatings on surfaces prior to firestopping installation. Temporary firestopping shall consist of packing openings with fire resistant mineral wool for the full thickness of substrate, or an alternate method approved by the Authority Having Jurisdiction. All openings shall be temporarily firestopped immediately upon their installation and shall remain so until the permanent UL or listed by Intertek / Warnock Hersey listed firestopping system is installed. B. Install penetration seal materials in accordance with printed instructions of the UL or Intertek / Warnock Hersey Fire Resistance Directory and with the manufacturer's printed application instructions. C. Install dams as required to properly contain firestopping materials within openings and as required to achieve required fire resistance rating. Remove combustible damming after appropriate curing. 3.3 CLEANING AND PROTECTING A. Clean excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not cause damage. B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements. 970 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 03 - 7 THROUGH PENETRATION FIRESTOPPING 3.4 IDENTIFICATION A. Provide and install labels adjacent to each firestopping location. Label shall be provided by the firestop system supplier and contain the following information in a contrasting color: 1. The words "Warning - Through Penetration Firestop System - Do Not Disturb. Notify Building Management of Any Damage." 2. Firestop System Supplier; UL or listed by Intertek / Warnock Hersey system number; date installed; contractor name and phone number; manufacturer's representative name, address, and phone number. 3.5 INSPECTION A. All penetrations shall be inspected by the manufacturer's representative to ensure proper installation. B. Access to firestop systems shall be maintained for examination by the Authority Having Jurisdiction at their request. C. Proceed with enclosing through-penetration firestop system with other construction only after inspection reports are issued and firestop installations comply with requirements. D. The contractor shall allow for visual destructive review of 5% of installed firestop systems (minimum of one) to prove compliance with specifications and manufacturer's instructions and details. Destructive system removal shall be performed by the contractor and witnessed by the Architect/Engineer and manufacturer's factory representative. The Architect/Engineer shall have sole discretion of which firestop system installations will be reviewed. The contractor is responsible for all costs associated with this requirement including labor and material for removing and replacing the installed firestop system. If any firestop system is found to not be installed per manufacturer's specific instructions and details, all firestop systems are subject to destructive review and replacement at the Architect/Engineer's discretion and the contractor's expense. END OF SECTION 27 05 03 971 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 1 COMMUNICATIONS BONDING SECTION 27 05 26 COMMUNICATIONS BONDING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Bonding Conductors B. Bonding Connectors C. Grounding Busbar (TMGB and TGB) D. Rack-mount Telecommunications Grounding Busbar 1.2 RELATED WORK A. Section 26 05 33 - Conduit and Boxes B. Section 26 05 36 - Cable Trays C. Section 26 05 13 - Wire and Cable D. Section 26 05 26 - Grounding and Bonding E. Section 27 05 00 - Basic Communications Systems Requirements F. Section 27 05 03 - Through Penetration Firestopping G. Section 27 11 00 - Communication Equipment Rooms H. Section 27 05 28 - Interior Communication Pathways I. Section 27 05 53 - Identification and Administration 1.3 QUALITY ASSURANCE A. Refer to Section 27 05 00 for relevant standards. B. Communications bonding system component, device, equipment, and material manufacturer(s) shall have a minimum of five (5) years documented experience in the manufacture of communications bonding products. C. The entire installation shall comply with all applicable electrical codes, safety codes, and standards. All applicable components, devices, equipment, and material shall be listed by Underwriters' Laboratories, Inc. 972 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 2 COMMUNICATIONS BONDING 1.4 REFERENCES A. ANSI/IEEE 1100 - Recommended Practice for Power and Grounding Sensitive Electronic Equipment in Industrial and Commercial Power Systems B. ANSI/TIA/EIA 568-C - Commercial Building Telecommunications Cabling Standard C. ANSI/TIA/EIA 569-A - Commercial Building Standard for Telecommunications Pathways and Spaces D. ANSI/TIA/EIA 606 - Administration Standard for the Telecommunications Infrastructure of Commercial Buildings E. ANSI/TIA/EIA 758 - Customer Owned Outside Plant F. ANSI-J-STD-607-A - Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications G. IEEE 81 - IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System Part 1: Normal Measurements H. IEEE 837 - IEEE Standard for Qualifying Permanent Connections Used in Substation Grounding I. NFPA 70 - National Electrical Code J. NFPA 780 - Standard for the Installation of Lightning Protection Systems K. UL 96 - Lightning Protection Components L. UL 96A - Installation Requirements for Lightning Protection Systems M. UL 467 - Grounding and Bonding Equipment 1.5 SUBMITTALS A. Submit product data and shop drawings under provisions of Section 27 05 00 and Division 1. B. Provide manufacturer's technical product specification sheet for each individual component type. Submitted data shall show the following: 1. Compliance with each requirement of these documents. The submittal shall acknowledge each requirement of this section, item-by-item, including construction, materials, ratings, and all other parameters identified in Part 2 - Products. 2. Manufacturer's installation instructions indicating application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of product. 973 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 3 COMMUNICATIONS BONDING C. Provide CAD-generated, project-specific system shop drawings as follows: 1. Provide a system block diagram indicating system configuration, system components, interconnection between components, and conductor routing. The diagram shall clearly indicate all wiring and connections required in the system. When multiple devices or pieces of equipment are required in the exact same configuration (e.g., multiple identical equipment racks or sections of ladder tray), the diagram may show one device and refer to the others as "typical" of the device shown. The diagram shall list room numbers where system equipment will be located. 2. Installation details for all system components. D. Provide system checkout test procedure to be performed at acceptance. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver products to the site under the provisions of Section 27 05 00. B. Store and protect products under the provisions of Section 27 05 00. C. Contractor shall exercise care to prevent corrosion of any products prior to installation. Corroded products shall not be acceptable for use on this project. 1.7 SYSTEM DESCRIPTION A. This section describes the requirements for the furnishing, installation, adjusting, and testing of a complete turnkey communications bonding system, including connection to the electrical ground grid. B. Performance Statement: This specification section and the accompanying drawings are performance based, describing the minimum material quality, required features, operational requirements, and performance of the system. These documents do not convey every wire that must be installed, every equipment connection that must be made, or every feature and function that must be configured. Based on the equipment constraints described and the performance required of the system as presented in these documents, the Contractor is solely responsible for determining all components, devices, equipment, wiring, connections, and terminations required for a complete and operational system that provides the required performance. C. This document describes the major components of the system. All additional hardware, subassemblies, supporting equipment, and other miscellaneous equipment required for complete, proper system installation and operation shall be provided by the Contractor. D. Basic System Requirements: 1. A complete communications bonding infrastructure is required for this project. Refer to the drawings and the requirements of ANSI-J-STD-607-A and NFPA 70 for complete information. 974 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 4 COMMUNICATIONS BONDING 2. The bonding system shall include, but not be limited to, the following major components: a. Bonding Conductor for Telecommunications (BCT) b. Telecommunications Main Grounding Busbar (TMGB) c. Telecommunications Bonding Backbone (TBB) d. Telecommunications Grounding Busbar(s) (TGB) e. Rack mount Telecommunications Grounding Busbar(s) f. Bonding Conductor(s) (BC) g. Bonding Connectors h. Bonding system labeling and administration as defined in Section 27 05 53. 1.8 PROJECT RECORD DOCUMENTS A. Submit documents under the provisions of Section 27 05 00. B. Provide final system block diagram showing any deviations from approved shop drawing submittal. C. Provide floor plans that document the following: 1. Actual locations of system components, devices, and equipment. 2. Actual conductor routing. 3. Actual system component, device, equipment, and conductor labels. D. Provide statement that system checkout test, as outlined in the approved shop drawing submittal, is complete and test results were satisfactory. E. Complete all operation and maintenance manuals as described below. 1.9 OPERATION AND MAINTENANCE DATA A. Submit under provisions of Section 27 05 00. B. Submitted data shall include: 1. Approved shop drawings. 2. Descriptions of recommended system maintenance procedures, including: a. Inspection b. Periodic preventive maintenance c. Fault diagnosis d. Repair or replacement of defective components 975 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 5 COMMUNICATIONS BONDING PART 2 - PRODUCTS 2.1 BONDING CONDUCTORS A. Bare Copper: 1. Annealed uncoated stranded conductor. 2. Minimum size 6 AWG. B. Insulated Copper: 1. Annealed uncoated stranded conductor. 2. Insulation: a. PVC insulation with nylon outer jacket. b. Rated at 600 volts. c. Green. 3. Minimum size 6 AWG. C. All bonding conductors shall be listed and recognized by a nationally recognized testing laboratory as being suitable for the intended purpose and for installation in the space in which they are installed. D. Bonding Conductor Sizing: 1. All communications bonding system conductors shall be sized by length as follows: Length Linear ft (m) Size (AWG) Less than 13 (4) 6 14 - 20 (4 - 6) 4 21 - 26 (6 - 8) 3 27 - 33 (8 - 10) 2 34 - 41 (10 - 13) 1 42 - 52 (13 - 16) 1/0 53 - 66 (16 - 20) 2/0 Greater than 66 (20) 3/0 2. The BCT shall be the same size as the TBB or larger. 2.2 BONDING CONNECTORS A. Acceptable Types: 1. Two-hole compression lug 2. Exothermic weld 3. Irreversible compression 976 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 6 COMMUNICATIONS BONDING B. Connectors shall be provided in kit form and selected per manufacturer's written instructions. C. Connectors shall comply with IEEE 837 and UL 467 and be listed for use for specific types, sizes, and combinations of conductors and connected items. 2.3 GROUNDING BUSBAR (TMGB AND TGB) A. Features: 1. Wall-mount configuration. 2. Listed and recognized by a nationally recognized testing laboratory as being suitable for intended purpose. 3. Hole patterns compliant with BICSI recommendations and ANSI-J-STD-607-A standards. 4. Predrilled holes. 5. Integral insulators. 6. Stainless steel offset mounting brackets. B. Specifications: 1. Material: Electrolytic tough pitch copper bar with tin plating. 2. Minimum Dimensions: 1/4" thick x 4" high x 12" long. a. Increase dimensions and/or quantity furnished and installed as required to accommodate all terminations required by the project, plus 20% spare capacity. 3. Hole pattern shall include: a. A minimum of 15 sets of 5/16" holes, 5/8" on center, to accommodate "A" spaced 2-hole compression lugs. b. A minimum of three (3) sets of 7/16" holes, 1" on center, to accommodate "C" spaced 2-hole compression lugs. 2.4 RACK-MOUNT TELECOMMUNICATIONS GROUNDING BUSBAR A. Features: 1. Listed and recognized by a nationally recognized testing laboratory as being suitable for intended purpose. 2. Predrilled holes. 3. Mounts in a standard 19" equipment rack. B. Specifications: 1. Material: Electrolytic tough pitch copper bar with tin plating. 2. Minimum Dimensions: 3/16" thick x 3/4" high x 19" long. 977 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 7 COMMUNICATIONS BONDING a. Increase dimensions and/or quantity furnished and installed as required to accommodate all terminations required by the project, plus 20% spare capacity. 3. Hole pattern shall include: a. A minimum of eight (8) 6-32 tapped lug mounting holes on 1" centers. b. A minimum of two (2) pairs of 5/16" diameter holes spaced 3/4" apart. PART 3 - EXECUTION 3.1 INSTALLATION A. General Bonding Requirements: 1. The communications bonding system shall be a complete system. Contractor shall furnish and install all necessary miscellaneous components, devices, equipment, material, and hardware, including, but not limited to, lock washers, paint-piercing washers, hex nuts, compression lugs, insulators, mounting screws, lugs, etc., to provide a complete system. 2. A licensed electrician shall perform all bonding. 3. Comply with the manufacturer's instructions and recommendations for installation of all products. B. Main Cross Connect and Service Entrance Room Bonding Requirements: 1. Locate the TMGB in the service entrance room unless otherwise noted on the drawings. 2. The location of the TMGB shall be the shortest practical distance from the telecommunications primary lightning protection devices. 3. Bond the telecommunications primary protectors to the TMGB. Maintain a minimum 1 foot separation of the bonding conductor from all DC power cables, switchboard cable, and high frequency cable. 4. In service entrance rooms where the entrance pathway contains an isolation gap, the pathway on the facility side of the gap shall be bonded to the TMGB. C. Where the service entrance cable contains a shield, the shield(s) shall be bonded to the TMGB using manufacturer-approved hardware. D. Telecommunications Main Ground Bar (TMGB) Requirements: 1. Install TMGB such that it is insulated from its support with a minimum 2" standoff. 2. Bond the TMGB to the electrical service ground via the BCT. a. A minimum of 1 foot separation shall be maintained between the BCT and any DC power cables, switchboard cable, or high frequency cables. 3. Where backbone or horizontal cabling contains a shield, the shield(s) shall be bonded to the TMGB. 978 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 8 COMMUNICATIONS BONDING 4. TMGB shall be bonded to all electrical panels located in the same room or space as the TMGB or in an immediately adjacent space within 20 linear feet of the TMGB. TMGB shall be bonded to all electrical panels providing electrical power to communications equipment located in the same room or space as the TMGB. 5. TMGB shall be bonded to accessible metallic building structure located within the same room or space as the TMGB. 6. All metallic continuous cable pathways, including, but not limited to, cable trays, basket trays, ladder racks, raceways, conduits, conduit sleeves, and fire-rated cable pathway devices, located within the same room or space as the TMGB, shall be bonded to the TMGB. 7. All metallic communications equipment, including, but not limited to, cable pair protectors, surge suppressors, cross-connect frames, patch panels, equipment cabinets, etc., located within the same room or space as the TMGB, shall be bonded to the TMGB. E. Telecommunications Ground Bar (TGB) Requirements: 1. Provide a TGB in each telecommunications equipment room. 2. Install TGB such that it is insulated from its support with a minimum 2" standoff. 3. Bond each TGB to the TMGB via the TBB. a. A minimum of 1 foot separation shall be maintained between the TBB and any DC power cables, switchboard cable, or high frequency cables. b. The TBB may be routed from TGB to TGB or as a radial feed to each TGB as the layout requires. 4. If more than one (1) TGB is provided within the same room or space, they shall all be bonded together via a BC the same size as the TBB. 5. Where horizontal cabling contains a shield, the shield(s) shall be bonded to the TGB. 6. TGBs shall be bonded to accessible metallic building structure located within the same room or space as the TGBs. 7. TGBs shall be bonded to all electrical panels located in the same room or space as the TGB or in an immediately adjacent space within 20 linear feet of the TGB. TGBs shall be bonded to all electrical panels providing electrical power to communications equipment located in the same room or space as the TGB. 8. All metallic continuous cable pathways, including, but not limited to, cable trays, basket trays, ladder racks, raceways, conduits, conduit sleeves, and fire-rated cable pathway devices, located within the same room or space as the TGB, shall be bonded to the TGB. 9. All metallic communications equipment, including, but not limited to, cable pair protectors, surge suppressors, cross-connect frames, patch panels, equipment cabinets, etc., located within the same room or space as the TGB, shall be bonded to the TGB. F. Rack-mount Telecommunications Ground Bar Requirements (RTGB): 1. Provide a rack-mount telecommunications ground bar in each equipment rack and equipment rack enclosure. 979 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 9 COMMUNICATIONS BONDING 2. Install RTGB such that it is electrically bonded to the rack. Where necessary, remove paint and/or use paint-piercing washers to provide proper electrical bond between RTGB and equipment rack. 3. Bond each RTGB to the TGB via a BC. 4. If more than one (1) RTGB is provided within the same room or space, they shall all be bonded together via a BC. 5. Where horizontal cabling containing a shield is terminated on rack-mounted termination hardware, the shield(s) shall be bonded to the RTGB. 6. All contractor-furnished and/or contractor-installed metallic communications equipment, including, but not limited to patch panels, fiber optic distribution enclosures, splice enclosures, active electronics, uninterruptible power supplies, etc., mounted within the same equipment rack as the RTGB, shall be bonded to the RTGB. Where necessary, remove paint and/or use paint-piercing washers to provide proper electrical bond between equipment rack and installed metallic communications equipment. Active electronics and uninterruptible power supplies shall be bonded to the RTGB via a dedicated BC for each device. G. Metallic Interior Communication Pathway Bonding Requirements: 1. All metallic interior continuous communication cable pathways, including, but not limited to, conduit, conduit sleeves, fire-rated cable pathway devices, cable tray, basket tray, and ladder rack, shall be bonded to the communications bonding system. H. Bonding Conductor Requirements: 1. Bonding conductors shall be green or marked with a distinctive green color. 2. Bonding conductors shall be routed parallel and perpendicular to building structure along shortest and straightest paths possible. Number of bends and changes in direction should be minimized. Install and secure conductors in a manner that protects the conductors from impact and from physical or mechanical strain or damage. 3. Bonding conductors shall not be installed in metallic conduit. 4. All conductors, including, but not limited, to the BCT, TBB, GE(s), and BC(s), shall be installed splice-free. If the Contractor believes that site conditions do not allow a splice-free installation, the Contractor may request permission from the Architect/Engineer to splice a specific communications bonding system conductor. a. Where documented permission to splice a conductor is granted: 1) The number of splices shall be limited to as few as possible. 2) Splices shall be made using exothermic welding or irreversible compression-type connections only. Splice hardware shall be listed for grounding and bonding. Solder is not an acceptable means of splicing conductors. 3) Splices shall be made in telecommunications spaces in accessible locations to facilitate future inspection and maintenance. 4) Splices shall be adequately supported and protected from impact and from physical or mechanical strain or damage. 980 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 10 COMMUNICATIONS BONDING 5. All bonding conductors shall be labeled in accordance with the requirements of Section 27 05 53. In addition to the requirements of Section 27 05 53: a. Labels shall be nonmetallic. b. Labels shall be printer-generated. c. Labels shall be located on conductors as close as is practical to their point of termination in a readable position. d. Additionally, conductors shall be labeled as follows: 1) "IF THIS CONNECTOR OR CABLE IS LOOSE OR MUST BE REMOVED, PLEASE CALL THE BUILDING TELECOMMUNICATIONS MANAGER." 6. Interior water piping is not acceptable for use as a communications bonding system bonding conductor. 7. Metallic cable shields are not acceptable for use as communications bonding system bonding conductors. I. Bonding Connection Requirements: 1. Make all connections in accessible locations to facilitate future inspection and maintenance. 2. Communications bonding system connections shall be made using exothermic welding, two-hole compression lugs, or other irreversible compression-type connections. The use of 1-hole lugs is prohibited, except for connections to a rack-mount telecommunications ground bar. Connection hardware shall be listed for grounding and bonding. Sheet metal screws shall not be used to make communications bonding system connections. 3. Thoroughly clean conductors before installing lugs and connectors. 4. Install and tighten all connectors in accordance with manufacturer's instructions, using the appropriate purpose-designed tool(s) recommended by the manufacturer for that purpose. Exercise care not to tighten connectors beyond manufacturer's recommendations. 5. Where necessary, remove paint and/or use paint-piercing washers to provide proper electrical bond at all connections. 6. All bonding connections shall be coated in anti-oxidant joint compound that is purpose-designed and purpose-manufactured for that use. Anti-oxidant joint compound shall be applied in accordance with manufacturer's recommendations and instructions. 7. All installed connectors on conductors installed in damp locations shall be sealed with dielectric grease and then covered with heat shrink tubing to protect against moisture ingress. Applied heat shrink tubing shall overlap conductor's outer jacket a minimum of four (4) inches past connector and be installed in accordance with manufacturer's recommendations and instructions. 3.2 FIELD QUALITY CONTROL A. Field inspection and testing shall be performed under provisions of Section 27 05 00. 981 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 11 COMMUNICATIONS BONDING B. Where these specifications require a product or assembly without the use of a brand or trade name, provide a product from a reputable manufacturer that meets the requirements of the specifications. C. Periodic observations will be performed during construction to verify compliance with the requirements of the specifications. These services do not relieve the Contractor of responsibility for compliance with the contract documents. 3.3 ADJUSTING A. Adjust work under provisions of Section 27 05 00. B. Contractor shall make any and all adjustments to the communications bonding system necessary to ensure that the installed system meets all requirements listed herein. Modifications necessary to comply with listed requirements or to provide specified performance shall be completed by the Contractor at no additional cost to the Owner. 3.4 TESTING A. Test installed system under provisions of Section 27 17 10. B. Measure and document resistance to ground at TMGB, each TGB, each RTGB, and each electrical distribution panel bonded to the TMGB or a TGB. 1. Measurements shall be made not less than two full days after the last trace of precipitation, and without the soil being moistened by any means other than natural drainage or seepage, and without chemical treatment or other artificial means of reducing natural ground resistance. Perform tests by the fall-of- potential method according to IEEE 81. 2. Measured resistance to ground at TMGB, each TGB, and each RTGB must not exceed 2 ohms. 3. Under no circumstances shall any point in the communications bonding system have a lower resistance to ground than that of nearby electrical distribution system components that it is bonded to. C. Measure and document voltage between screen of installed and terminated ScTP, FTP, and/or SSTP horizontal cables and electrical ground of electrical outlet(s) serving the information outlet location area. 1. The voltage between the screen and the ground wire shall not exceed 1.0 V rms, and 1.0 V dc for any installed and terminated ScTP, FTP, and/or SSTP horizontal cables. D. Include measurement documentation in test data submitted at completion of project under provisions of Section 27 17 10. 3.5 SYSTEM TRAINING A. All labor and materials required for on-site system training shall be provided. Training shall be conducted at the project site using the project equipment. 982 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 26 - 12 COMMUNICATIONS BONDING 1. Provide two week's advanced notice of training to the Owner and Architect/Engineer. 2. The Architect/Engineer shall be presented with the option to attend the training. 3. Provide a training outline agenda describing the subject matter and the recommended audience for each topic. B. At a minimum, the following training shall be conducted: 1. A course detailing the system functions and operations that a technical user will encounter. Provide training on all aspects of using the system, including making new bonding connections to the TMGB, TGB, or RTGB. Provide training on all recommended inspection, maintenance, and repair procedures for the system. C. Minimum on-site training times shall be: 1. Technical user: One hour. END OF SECTION 27 05 26 983 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 28 - 1 INTERIOR COMMUNICATION PATHWAYS SECTION 27 05 28 INTERIOR COMMUNICATION PATHWAYS PART 1 - GENERAL 1.1 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, tests and services to install conduits, sleeves, innerduct, etc. for an interior cabling plant as shown on the drawings. 1.2 RELATED WORK A. Section 26 05 33 - Conduit and Boxes B. Section 27 05 00 - Basic Communications Systems Requirements C. Section 27 05 26 - Communications Bonding 1.3 QUALITY ASSURANCE A. Refer to Section 27 05 00 for requirements. 1.4 REFERENCES A. ANSI/NFPA 70 - National Electrical Code 1.5 SUBMITTALS A. Under the provisions of Section 27 05 00 and Division 1, prior to the start of work the Contractor shall submit: 1. Manufacturer's data covering all products proposed, including construction, materials, ratings and all other parameters identified in Part 2 - Products, below. 2. Manufacturer's installation instructions. B. Coordination Drawings: 1. Include cable tray and conduit sleeve layout in composite electronic coordination files. Refer to Section 27 05 00 for coordination drawing requirements. 2. Reference AV and Owner provided Broadcast drawings for Control Room and Server Room areas. 984 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 28 - 2 INTERIOR COMMUNICATION PATHWAYS 1.6 DRAWINGS A. The drawings, which constitute a part of these specifications, indicate the general route of conduit, sleeves, etc. Data presented on these drawings is as accurate as preliminary surveys and planning can determine until final equipment selection is made. Accuracy is not guaranteed and field verification of all dimensions, routing, etc., is required. PART 2 - PRODUCTS 2.1 CONDUIT A. Refer to Section 26 05 33 for conduit requirements for this project. 2.2 CABLE HANGERS AND SUPPORTS A. Provide a non-continuous cable support system suitable for use with open cable. B. Cable Hooks: 1. Construction: Flat bottom design with a minimum cable bearing surface of 1-5/8". Hooks shall have 90-degree radius edges. 2. All cable hook mounting hardware shall be recessed to prevent damage to cable during installation. Installed cabling shall be secured using a cable latch retainer that shall be removable and reusable. 3. Finish: Pre-galvanized steel, ASTM A653 suitable for general duty use. 2.3 INNERDUCT - CORRUGATED A. Fabricated from self-extinguishing high-impact polyvinyl chloride (PVC), orange in color. B. Fittings and accessories fabricated from same material as conduit and usable with rigid nonmetallic conduit. C. Solvent-cement type joints as recommended by manufacturer. D. Inside diameter not less than that of rigid steel conduit. E. Dielectric strength a minimum of 400 volts per mil. F. Corrugated wall construction. G. Pull rope pre-installed by manufacturer. 985 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 28 - 3 INTERIOR COMMUNICATION PATHWAYS H. Innerduct installed within buildings (not including riser paths) or utility tunnels shall meet all the above General requirements plus: 1. Be fabricated of flame-retardant materials (plenum rated) suitable for installation in such environments. 2. Meet or exceed all requirements for flame resistant duct as required by Bellcore TR-NWT-000356 (Section 4.33). I. Innerduct installed within building riser shafts shall meet all the above general requirements plus: 1. Be fabricated of flame-retardant materials suitable for installation in such environment. J. Meet or exceed all requirements for flame propagation as specified by test method UL-1666 and referenced by the National Electrical Code (NEC) Section 770-53 for listed optical fiber raceways being installed in vertical runs in a shaft between floors. PART 3 - EXECUTION 3.1 INNER DUCT INSTALLATION REQUIREMENTS A. Inner duct shall be riser or plenum rated as required by the installation environment. At minimum, inner duct should extend to the ladder rack above the termination enclosure at system endpoints. Where not installed in a continuous length, inner duct segments should be spliced using couplings designed for that purpose. B. All exposed inner duct is to be labeled at 35-foot intervals with tags indicating ownership, the cable type (e.g., "Fiber Optic Cable") and the cables it contains (e.g., MA-CS or FS-CS). C. Where exposed, fiber optic cable shall be installed in protective inner duct. D. Contractor shall determine optimum size and quantity to satisfy the requirements of the installation and to ensure that the mechanical limitations, including minimum bend radius of the cable, are considered. E. The inner duct should extend into the termination enclosure at system endpoints. F. Where not installed in a continuous length, inner duct segments should be spliced using couplings designed for that purpose. 3.2 CABLE HOOK SUPPORT SYSTEM A. In areas where cabling is not supported by cable tray, ladder rack, enclosed wireway or installed in conduit, such cabling shall be supported by an approved cable hook support system. 986 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 28 - 4 INTERIOR COMMUNICATION PATHWAYS B. Refer to manufacturer's requirements for allowable fill capacity for selected cable hook. In no case shall a 40% fill capacity be exceeded. C. Cable hooks shall be securely mounted per manufacturer's instructions. In no case shall the side-to-side travel of any cable hook exceed 6". D. Cable hooks shall be selected based on the contractor's cable routing. Hooks shall be capable of supporting a minimum of 30 pounds with a safety factor of 3. E. J-hook support spans shall be based on the smaller of the manufacturer's load ratings and code requirements. In no case shall horizontal spans exceed 5 feet and vertical spans exceed 4 feet. F. The resting and supporting of cabling on structural members shall not meet the requirements for cabling support specified herein. G. The use of tie-wraps or hook and loop type fasteners is specifically prohibited as a substitute for cable hooks specified herein. 3.3 CONDUIT AND CABLE ROUTING A. Refer to Section 26 05 33 for additional requirements. B. All conduits shall be reamed and shall be installed with a nylon bushing. C. Maintain appropriate conduit bend radius at all times. For conduits with an internal diameter of less than 2", maintain a bend radius of at least 6 times the internal diameter. For conduits with an internal diameter 2" or greater, maintain a bend radius of at least 10 times the internal diameter. D. No conduit or sleeve containing more than two (2) cables shall exceed 40% fill ratio, regardless of length. E. Any conduit exceeding 90' in length or containing more than two (2) 90-degree bends shall contain a pull box sized per ANSI/TIA/EIA 569 requirements. 1. A separate pull box is required for each 90' (or greater) length section. 2. A separate pull box is required after any two (2) consecutive 90-degree bends. 3. Pull box shall be located in an area that maintains accessibility of box, including the ability to remove box lid without removal or relocation of any other materials. F. Any conduit with bends totaling 90 degrees or more shall have the fill capacity derated by 15% for each 90 degrees of cumulative bend. G. Cables installed in any conduits that do not meet the above requirements shall be replaced at the Contractor's expense, after the conduit condition has been remedied. END OF SECTION 27 05 28 987 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 53 - 1 IDENTIFICATION AND ADMINISTRATION SECTION 27 05 53 IDENTIFICATION AND ADMINISTRATION PART 1 - GENERAL 1.1 SECTION INCLUDES A. This section describes the identification and administration requirements relating to the structured cabling system and its termination components and related subsystems. B. Identification and labeling. 1.2 RELATED WORK A. Section 27 05 00 - Basic Communications Systems Requirements 1.3 QUALITY ASSURANCE A. Refer to Section 27 05 00 for relevant standards. 1.4 SUBMITTALS A. Under the provisions of Section 27 05 00 and Division 1, prior to the start of work the Contractor shall submit: 1. Documentation of labeling scheme. PART 2 - PRODUCTS 2.1 LABELING A. Adhesive labels shall meet the requirements of UL 969 (Ref D-16) for legibility, defacement and adhesion. Exposure requirements of UL 969 for indoor and outdoor (as applicable) use shall be met. B. Insert labels shall meet the requirements of UL 969 for legibility, defacement and general exposure. C. Labeling shall be consistent for all common elements in the project. This consistency shall include label size, color, typeface an attachment method. D. Tag all CAT 6 and optical fiber cables at both the Communications Equipment Room and the information outlets using the following alphanumeric labeling system: 1. (Telecom Room Number) - (Patch Panel Letter) - (Patch Panel Port Number). 2. "Telecom Room Number" shall be as indicated on the drawings. 988 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 53 - 2 IDENTIFICATION AND ADMINISTRATION 3. "Patch Panel Letter" shall start with 'A' for the top modular patch panel, increasing sequentially from top to bottom across the equipment rack. 4. "Patch Panel Port Number" shall start with '1' for the upper left port in each modular patch panel, increasing sequentially from left to right and top to bottom across the modular patch panel face. 5. Example #1: MC/1-A3 indicates the third modular patch panel port in modular patch panel 'A' in Main Equipment Room (MC/1). 6. Example #2: HC/2-C39 indicates the thirty-ninth modular patch panel port in modular patch panel C in Horizontal Cross-Connect room (HC/2). 2.2 DOCUMENTATION/AS-BUILTS/RECORDS A. General: 1. Upon completion of the installation, the Contractor shall submit as-builts per the requirements of Section 27 05 00 and Division 1. Documentation shall include the items detailed in the subsections below. 2. All documentation, including hard copy and electronic forms shall become the property of the Owner. B. Record Drawings: 1. The drawings are to include cable routes and outlet locations. Outlet locations shall be identified by their sequential number as defined elsewhere in this document. Numbering, icons and drawing conventions used shall be consistent throughout all documentation provided. PART 3 - EXECUTION 3.1 IDENTIFICATION AND LABELING A. Cable Labeling: Backbone and horizontal cables shall be labeled at each end. 1. Provide additional cable labeling at each manhole and pull box. 2. Cables that are routed through multiple pathway segments shall contain reference to all pathway segments in the pathway linkage field. 3. Cables that differ only by performance class shall have a suitable marking or label to indicate the higher performance class. For example, station cabling utilizing the blue color, may include blue with a white stripe to indicate the higher performance class station cabling. B. Information Outlet Labeling: Tag all voice and data jacks as defined herein. C. Termination Hardware Labeling: 1. An identifier shall be provided at each termination hardware location or its label. 989 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 05 53 - 3 IDENTIFICATION AND ADMINISTRATION D. Grounding/Bonding Labeling: 1. The TMGB shall be labeled "TMGB." There shall be only one TMGB in the facility. 2. Label all TBB conductors connecting to the TMGB with a unique label, located at both ends of the TBB. 3. Each TGB shall be labeled with a unique label. 4. All TBB conductors connecting to the TGB shall be labeled uniquely at each end of the cable. END OF SECTION 27 05 53 990 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 1 COMMUNICATION EQUIPMENT ROOMS (CER) SECTION 27 11 00 COMMUNICATION EQUIPMENT ROOMS (CER) PART 1 - GENERAL 1.1 SECTION INCLUDES A. This section describes the products and execution requirements related to furnishing and installing equipment for communication equipment rooms. 1.2 RELATED WORK A. Section 27 05 00 - Basic Communications Systems Requirements B. Section 27 05 26 - Communications Bonding C. Section 27 05 28 - Interior Communication Pathways D. Section 27 15 00 - Horizontal Cabling Requirements 1.3 QUALITY ASSURANCE A. Refer to Section 27 05 00 for applicable standards. 1.4 SUBMITTALS A. Under the provisions of Section 27 05 00 and Division 1, prior to the start of work the Contractor shall submit: 1. Manufacturer's data covering all products including construction, materials, ratings and all other parameters identified in Part 2 - Products, below. 2. Manufacturer's installation instructions. B. Coordination Drawings: 1. Include ladder racking, equipment racks, cable tray and conduit sleeve layout in composite electronic coordination files. Refer to Section 27 05 00 for coordination drawing requirements. PART 2 - PRODUCTS 2.1 EQUIPMENT GROUNDING A. Refer to specification section 27 05 26 for grounding requirements. B. All equipment required to be grounded shall be provided with a grounding lug suitable for termination of the specified size electrode conductor. 991 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 2 COMMUNICATION EQUIPMENT ROOMS (CER) 2.2 EQUIPMENT RACKS AND CABINETS A. Where identified on the drawings in Communication Equipment Rooms, equipment racks and/or equipment cabinets shall be furnished and installed by the Contractor to house cable termination components (e.g., copper, optical fiber, coax) and network electronics. B. The equipment rack shall conform to the following requirements: 1. Standard TIA/EIA 19" Floor Rack: a. Equipment rack shall be 84" in height, self-supporting and provide a useable mounting height of 45 rack units (RU) (1 RU = 1 3/4"). b. Channel uprights shall be spaced to accommodate industry standard 19" mounting. c. Equipment rack shall be 3/8" square punched to accept cage nuts. Uprights shall also be drilled on back to accept cable brackets, clamps, power strip(s), etc. Hole pattern on rack front shall be per TIA/EIA specifications. Hole pattern on the rear shall be at 3" intervals to accept cable brackets. d. Equipment racks shall be provided with a supply of spare screws and cage nuts (minimum of 24). e. Equipment racks shall be provided with a ground bar and #6 AWG ground lug. f. Provide all mounting hardware and accessories as required for a complete installation. 2.3 CABLE MANAGEMENT - VERTICAL AND HORIZONTAL A. Equipment Racks: 1. Equipment racks shall be equipped with vertical and horizontal cable management hardware in the form of rings and guides. Racks shall incorporate vertical and horizontal covers, to allow an orderly, hidden, routing of copper, optical fiber, and coax jumpers from the modular patch panels and/or 110-type termination blocks to the customer provided network electronics. Vertical and horizontal cable management hardware shall be as follows: a. Horizontal cable management hardware shall be 16 gauge cold rolled steel construction with six (6) pass-thru holes and seven (7) front-mounted 3.5" steel rod D-rings. Provide with cover designed to conceal and protect cable. b. At a minimum, horizontal cable management hardware shall be positioned above and below (a) each grouping of two rows of jacks on modular patch panels, and (b) above and below each optical fiber patch panel and (c) each grouping of two rows of F-type connectors on coax patch panels. c. Vertical cable management hardware shall provide for cable routing on front and rear of each rack and be 14" deep x 6" wide (minimum). Where multiple equipment racks are to be installed, this hardware shall be mounted between the uprights of adjacent equipment racks. Equipment rack uprights and the spacers shall be secured together per manufacturer's recommendations. Provide with cover designed to conceal and protect cable. 992 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 3 COMMUNICATION EQUIPMENT ROOMS (CER) 2. Each equipment rack shall be supplied with a minimum of 12 releasable (e.g., "hook and loop") cable support ties. 3. Where cable termination hardware is wall-mounted, the Contractor shall be responsible for establishing a cable pathway for jumpers routed from the equipment rack(s) to the wall. This shall be in the form of slotted ducts or troughs. Routing of jumpers via the overhead cable tray or ladder rack system is NOT acceptable. The proposed method shall be included in the submittals required by this document and shall be approved by the Architect/Engineer prior to installation. 2.4 PATCH PANELS A. Where identified on the drawings in Communication Equipment Rooms, modular patch panels shall be furnished and installed by the Contractor for termination of copper cable. B. Copper cabling shall be terminated in Communication Equipment Rooms on modular patch panels consisting of a modular connector system incorporating modular jacks meeting the specifications for the jacks detailed in Section 27 15 00. C. The largest single modular patch panel configuration shall not exceed 48-Ports. Modular patch panels shall be fully populated (all ports occupied by jacks) and be provided in increments of no less than 12 jacks. High-density modular patch panels will not be accepted. D. The modular patch panel blocks shall have the ability to seat and cut eight (8) conductors (4 pairs) at a time and shall have the ability of terminating 22- through 26- gauge plastic insulated, solid and stranded copper conductors. Modular patch panel blocks shall be designed to maintain the cables' pair twists as closely as possible to the point of mechanical termination. E. Modular patch panels shall incorporate cable support and/or strain relief mechanisms to secure the horizontal cables at the termination block and to ensure that all manufacturers minimum bend radius specifications are adhered to. 2.5 OPTICAL FIBER PANELS A. All terminated optical fibers shall be mated to simplex LC-type couplings mounted on enclosed fiber distribution cabinets. Couplings shall be mounted on a panel that, in turn, snaps into the enclosure. The proposed enclosure shall be designed to accommodate a changing variety of connector types including SC, ST, Fixed Shroud Duplex (e.g., "FDDI Connector"), Biconic, FC, and MT-RJ by changing panels on which connector couplings are mounted. B. The fiber distribution cabinet shall be sized to accommodate the total fiber count to be installed at each location as defined in the specifications and drawings, including those not terminated (if applicable). Connector panels and connector couplings (sleeves, bulkheads, etc.) adequate to accommodate the number of fibers to be terminated shall be furnished and installed by the Contractor. 993 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 4 COMMUNICATION EQUIPMENT ROOMS (CER) C. The fiber distribution cabinet shall be an enclosed assembly affording protection to the cable subassemblies and to the terminated ends. The enclosures shall incorporate a hinged or retractable front cover designed to conceal and protect the optical fiber couplings, connectors, and cable. D. Access to the inside of the fiber distribution cabinet's enclosure during installation shall be from the front and/or rear. Panels that require any disassembly of the fiber distribution cabinet to gain entry will not be accepted. E. The fiber distribution cabinet's enclosure shall provide for strain relief of incoming optical fiber cables and shall incorporate radius control mechanisms to limit bending of the optical fiber to the manufacturer's recommended minimums or ½½", whichever is larger. F. All fiber distribution cabinets shall provide protection to both the "facilities" and "user" side of the coupling. The fiber distribution cabinet's enclosure shall be configured to require front access only when patching. The incoming optical fiber cables (e.g., backbone, riser, horizontal, etc.) shall not be accessible from the patching area of the panel. The fiber distribution cabinet's enclosure shall provide a physical barrier to access such optical fiber cables. G. Where "Loose Buffered" cables are installed, the 250 µµm coated optical fibers contained in these cables may be terminated either by (1) splicing of factory- terminated cable assemblies ("pigtails") or (2) the use of a "fan-out" kit. In the latter approach, individual fibers are to be secured in a protective covering, an Aramid (e.g., Kevlar¢¢) reinforced tube for example, with connectors mated to the resulting assembly. In both instances, the proposed termination hardware shall incorporate a mechanism by which cable and subassemblies are secured to prevent damage. Splicing shall be by the "fusion" method. Individual splice loss shall not exceed 0.3 dB for multi-mode fibers. Direct termination of 250 µµm coated optical fibers shall not be permitted. H. Fiber distribution cabinets for horizontal cabling: Where optical fiber horizontal cabling is to be terminated, the enclosure shall be compliant to all the above requirements plus the enclosure shall incorporate a storage mechanism designed to allow simplified identification, access to and termination of individual optical fibers. This may be in the form of a storage cassette, tray or other appropriate mechanism. 2.6 OPTICAL FIBER COUPLERS/ADAPTERS A. Optical Fiber Couplings (LCtype) (Multimode/Singlemode): 1. LC-type optical fiber couplings shall be used to terminate optical fiber backbone cable on fiber distribution cabinet panels in communication equipment rooms. Horizontal optical fiber cables shall also be terminated using optical fiber couplings at their designated work area locations on information outlet faceplates for "fiber to the desk." 2. LC-type optical fiber couplings shall be snap-type with locking washer and nut. 3. LC-type optical fiber couplings shall incorporate domed zirconia ferrule and shall utilize a PC polish to ensure fiber-to-fiber physical contact for low loss and reflections. 994 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 5 COMMUNICATION EQUIPMENT ROOMS (CER) 4. LC-type optical fiber couplings shall accept 125-micron outside diameter multimode fiber. 5. The attenuation per mated pair shall not exceed 0.7 dB (individual) and 0.5 dB (average). Connectors shall sustain a minimum of 200 mating cycles per TIA/EIA-455-21 without violating specifications. 6. LC-type optical fiber couplings shall meet the following performance criteria: Test Procedure Maximum Attenuation Change Cable Retention (FOTP-6) 0.2 dB Durability (FOTP-21) 0.2 dB Impact (FOTP-2) 0.2 dB Thermal Shock (FOTP-3) 0.2 dB Humidity (FOTP-5) 0.2 dB 7. Performance Requirements: a. Length: 2 inches b. Operating Temperature: -40 to 85 degrees C 2.7 LADDER RACK A. Provide complete ladder rack system including metallic ladder rack, splice connectors, fastening hardware and other miscellaneous materials as required for a complete installation per manufacturer's recommendations. B. Tubing Style Ladder Rack: 1. Rolled steel siderail stringer, minimum 1.5" stringer height, 9" spaced welded rungs. 2. Steel shall meet the requirements of ASTM A1011 SS Grade 33. 3. Loading limits shall be 185 lbs/ft for 4 ft spans. C. Ladder rack finish shall be flat black powder coat. 2.8 D-RINGS A. Rounded edge D-rings for support of cabling in vertical and horizontal configurations. B. EIA 310D compliant, manufactured from materials meeting UL94-V0 specifications. C. Provide 1/4" screw holes for wall mounting. 2.9 POWER STRIPS A. Provide power strips on all equipment racks, unless noted otherwise. These power strips shall have the following characteristics: 1. Standard Rack Mount: a. TIA/EIA 19" equipment rack mountable. 995 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 6 COMMUNICATION EQUIPMENT ROOMS (CER) b. Compliant with UL-1449 Third Edition and UL-497A. c. Provide transient suppression to 12,000-A. Protection shall be in all three modes (line-neutral, line-ground and neutral-ground). d. Shall meet or exceed ANSI C62 Category A3 requirements. e. Provide high-frequency noise suppression as follows: 1) Greater than 20-dB @ 50 kHz 2) Greater than 40-dB @ 150 kHz 3) Greater than 80-dB @ 1 MHz 4) Greater than 30-dB @ 6 to 1000 MHz f. Protection Modes and UL 1449 Clamping Voltage: 475 volt L-N, L-G, and N-G. g. Components: Nonmodular units composed of 20mm metal oxide varistors (MOV). Series inductors, SAD, or selenium cells may be used in addition to MOVs. h. Be equipped with a 10-foot power cord. 2.10 COPPER PATCH CORDS A. Modular Patch Panel: 1. Provide Category 6 copper patch cords for 50% of all assigned ports on the modular patch panel. Of these cords, 60% shall be 3' in length and 40% shall be 5' in length. These patch cords shall be the cross-connect between the network electronics and the horizontal RJ-45 modular patch panel. Copper patch cords shall be equipped with a 4-pair RJ-45 connector on each end. 2. Refer to Section 27 15 00 for cable and connector performance requirements. 3. Patch cords shall not be made-up in the field. 2.11 FIBER PATCH CORDS A. Optical Fiber Patch Cords (Multimode): 1. Provide 50/125 mm multimode (MM) optical fiber utilizing tight buffer construction for 50% of all assigned ports on the fiber distribution cabinet. These patch cords shall be the cross-connect between the backbone fiber distribution cabinet and the Owner's network electronics (hub/switch). Optical fiber patch cords shall be equipped with a ceramic tipped LC-type connector on each end and shall be a minimum of 5 feet in length. Connector body shall be of materials similar to that used in the proposed couplings. Provide required lengths as determined on the plans. 2. Channels shall be of equal length. 3. Refer to Section 27 15 00 for cable and connector performance requirements. B. Optical Fiber Patch Cords (Singlemode): 1. The optical fiber patch cord shall be 8.3/3 mm singlemode (SM) optical fiber, utilizing tight buffer construction. The optical fiber patch cords shall be a minimum of 5 feet in length. 996 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 7 COMMUNICATION EQUIPMENT ROOMS (CER) 2. Provide 8.3/3 mm singlemode (SM) optical fiber utilizing tight buffer construction for 50% of all assigned ports on the fiber distribution cabinet. These patch cords shall be the cross-connect between the backbone fiber distribution cabinet and the Owner's network electronics (hub/switch). Optical fiber patch cords shall be equipped with a ceramic tipped LC-type connector on each end and shall be a minimum of 5 feet in length. Connector body shall be of materials similar to that used in the proposed couplings. Provide required lengths as determined on the plans. 3. Channels shall be of equal length. 4. Refer to Section 27 15 00 for cable and connector performance requirements. PART 3 - EXECUTION 3.1 EQUIPMENT RACKS A. Equipment racks shall be furnished and installed as shown on the drawings. B. The Contractor shall bolt the rack to the floor as recommended by the manufacturer. Multiple racks shall be joined and the ground made common on each. The rack shall be stabilized by extending a brace to the wall. Alternately, overhead ladder rack by which the cabling accesses the equipment rack(s) may provide this function. C. A space between the rack upright and the wall (approximately 4") should be provided to allow for cabling in that area. The rear of the rack should be approximately 40" from the wall to allow for access by maintenance personnel. In all cases, a minimum of 40" workspace in front of the rack is also required. Locations where these guidelines cannot be followed should be brought to the attention of the Architect/Engineer for resolution prior to installation. D. All hardware and equipment is to be mounted between 18" and 79" above floor level. This is to afford easy access and, in the case of the lower limit, prevent damage to the components. Positioning of hardware should be reviewed and approved by the Architect/Engineer and Site Coordinator(s) prior to installation. E. Equipment racks shall be equipped with cable management hardware as to allow an orderly and secure routing of optical fiber and/or copper cabling to the optical fiber distribution cabinets and/or modular patch panels. At minimum, one such horizontal jumper management panel shall be placed below each optical fiber distribution cabinet installed by the Contractor. Additional Jumper Management panels may be required pending installation of other cable types on the equipment rack. F. Each rack shall be grounded to the Telecommunications Ground Bar (GND) using a #6 AWG (or larger) insulated stranded copper conductor (GREEN jacket) directly or via an adjacent grounded equipment rack. Refer to grounding requirements below. 3.2 LADDER RACK A. Provide support for ladder rack on 4 ft centers. B. Maintain a 1.5 safety factor on all load limits specified herein. 997 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 8 COMMUNICATION EQUIPMENT ROOMS (CER) C. Ladder rack support shall be by 5/8" diameter threaded rod when ceiling mounted. Ladder rack requiring wall mounting shall utilize accessories supplied by the ladder rack manufacturer specifically for the purpose of wall mounting ladder rack. 3.3 D-RINGS A. Provide D-rings for cable routing and management in all areas where open cabling is routed along the wall in an Equipment Room. B. Locate D-rings on 24" centers vertically and horizontally. C. Securely attach D-rings to the wall as required by the manufacturer. 3.4 GROUNDING A. Provide a complete grounding system in accordance with the requirements of Section 27 05 26. 3.5 CROSS CONNECT INSTALLATION A. Bend radius of cable shall not exceed 4 times the outside cable diameter or manufacturer's recommendation, whichever is less. B. Cables shall be neatly bundled and dressed to their respective panels and/or blocks. Each shall be fed by an individual bundle separated and dressed to the point of cable entrance into the rack and/or frame. C. The cable jacket shall be maintained as close as possible to the termination point. D. Each cable shall be clearly labeled on the cable jacket behind the patch panel at a location that is visible without removing the bundle support. 3.6 OPTICAL FIBER TERMINATION A. All fiber slack shall be neatly coiled within fiber splice enclosures or splice trays. No slack loops shall be allowed external to the enclosure. B. Each cable shall be individually attached to the respective fiber enclosure by mechanical means. The cable strength member shall be securely attached to the cable strain relief bracket in the enclosure. C. Each cable shall be clearly labeled at the entrance to all enclosures. D. A maximum of 12 strands shall be spliced in any tray. 3.7 CONDUITS AND CABLE ROUTING A. Refer to Section 26 05 33 for additional requirements. 998 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 11 00 - 9 COMMUNICATION EQUIPMENT ROOMS (CER) B. Where conduits enter a telecommunications room, conduits shall be terminated on the wall where shown on the contract documents. Conduits entering the room from the floor shall extend 3" above the floor slab. C. Where cabling rises vertically in a telecommunications rooms, provide vertical cable management to support the cabling from floor to ceiling level. D. All conduits shall be reamed and shall be installed with a nylon bushing. E. Maintain appropriate conduit bend radius at all times. For conduits with an internal diameter of 2" or less, maintain a bend radius of at least 6 times the internal diameter. For conduits with an internal diameter greater than 2", maintain a bend radius of at least 10 times the internal diameter. END OF SECTION 27 11 00 999 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 13 00 - 1 BACKBONE CABLING REQUIREMENTS SECTION 27 13 00 BACKBONE CABLING REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. This section describes the products and execution requirements relating to furnishing and installing backbone communications cabling and termination components and related subsystems as part of a cabling plant. The cabling plant consists of both optical fiber and/or copper cabling. 1.2 RELATED WORK A. Section 27 05 00 - Basic Technology Systems Requirements. B. Section 27 15 00 - Horizontal Cabling Requirements. C. Section 27 17 20 - Structured Cabling System Warranty. 1.3 QUALITY ASSURANCE A. Refer to Section 27 05 00 for relevant standards. 1.4 SUBMITTALS A. Under the provisions of Section 27 05 00 and Division 1, prior to the start of work the Contractor shall submit: 1. Manufacturer's data covering all products proposed, including construction, materials, ratings and all other parameters identified in Part 2 - Products, below. 2. Manufacturer's installation instructions. PART 2 - PRODUCTS 2.1 GENERAL A. The basis of design is listed herein. Refer to Section 27 17 20 for additional acceptable manufacturers. 2.2 OPTICAL FIBER BACKBONE - INSIDE PLANT A. Multimode (MM)/Singlemode (SM): 1. This optical fiber backbone cable shall be suitable for installation in building riser systems, in conduit, in cable tray and/or in innerduct. 2. Optical fiber cable materials shall be all dielectric (no conductive material). 1000 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 13 00 - 2 BACKBONE CABLING REQUIREMENTS 3. Optical fiber cable shall carry an OFNR (optical fiber non-conductive riser) or OFNP (optical fiber non-conductive plenum) rating. Refer to Section 27 05 00 for project requirements. 4. Optical fiber cable shall be interlocking armored cable. 5. Outer Sheath: The outer sheath shall be marked with the manufacturer's name, date of manufacture, fiber type, flame rating, UL symbol, and sequential length markings every two feet. 6. Temperature Range: a. Storage: -40°C to +70°C (no irreversible change in attenuation). b. Operating: -40°C to +70°C. 7. Humidity Range: 0% to 100%. 8. Maximum Tensile Strength (å? 12 fibers): a. During Installation: 1332 N (300 lb. force) (no irreversible change in attenuation). b. Long-Term: 600 N (135 lb. force). 9. Maximum Tensile Strength (ä? 6 fibers): a. During Installation: 1000 N (225 lb. force) (no irreversible change in attenuation). b. Long-Term: 100 N (67 lb. force). 10. Bending Radius: a. During Installation: 20 times cable diameter. b. No Load: 10 times cable diameter. B. Optical fiber cables suitable for installation in multiple environments (e.g., underground duct and building risers) may be used at the Contractor's option. Such optical fiber cables shall meet all specifications noted above for cables designated for each environment through which the optical fiber cable shall pass. C. Basis of Design (OM3 Multimode): 1. CommScope D. Basis of Design (Singlemode): 1. CommScope E. Optical Fiber Pigtails (Multimode): 1. Single-fiber fiber optic pigtails shall be constructed from 50/125 µm multimode (MM) optical fiber of the same grade as the multimode fiber optic backbone cable utilizing tight buffer construction. 2. Fiber optic pigtails shall be factory terminated with a ceramic tipped LC-type connector on one end and shall be a minimum of 5 feet (1.5m) in length or as indicated on the drawings. Channels shall be of equal length. 1001 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 13 00 - 3 BACKBONE CABLING REQUIREMENTS 3. Connector body shall be of materials similar to that used in the proposed couplings. Refer to Section 27 15 00 for connector performance requirements. 4. Provide in quantity to terminate all backbone fiber optic cable strands on each end. 5. Basis of Design: a. Multimode Optical Fiber Pigtails shall be from the same manufacturer as used for the fiber optic termination equipment. F. Optical Fiber Pigtails (Singlemode): 1. Single-fiber fiber optic pigtails shall be constructed from singlemode (SM) optical fiber of the same grade as the singlemode fiber optic backbone cable utilizing tight buffer construction. 2. Fiber optic pigtails shall be factory terminated with a ceramic tipped LC-type connector on one end and shall be a minimum of 5 feet (1.5m) in length or as indicated on the drawings. Channels shall be of equal length. 3. Connector body shall be of materials similar to that used int he proposed couplings. Refer to Section 27 15 00 for connector performance requirements. 4. Provide in quantity to terminate all backbone fiber optic cable strands on each end. 5. Basis of Design: a. Multimode Optical Fiber Pigtails shall be from the same manufacturer as used for the fiber optic termination equipment. G. Optical Fiber Connectors (LC-type) (Multimode/Singlemode): 1. LC-type Optical Fiber Connectors: Shall be used to terminate optical fiber in communication equipment rooms. 2. LC-type optical fiber connector plugs shall be snap-type with an integrated pull- proof design. 3. LC-type optical fiber connector plugs shall incorporate a zirconium ceramic ferrule and shall utilize a factory pre-polish end face to ensure fiber-to-fiber physical contact for low loss and reflections. 4. LC-type optical fiber connector plugs shall accept 1.6mm - 2.0mm and 3.0mm outside diameter fiber. 5. The average insertion loss is 0.3db for multimode and single mode connectors 6. LC-type optical fiber connector plugs shall meet the following performance criteria: Test Procedure Maximum Attenuation Change Cable Retention (FOTP-6) 0.2dB Durability (FOTP-21) 0.2dB Impact (FOTP-2) 0.2dB Thermal Shock (FOTP-3) 0.2dB Humidity (FOTP-5) 0.2dB 1002 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 13 00 - 4 BACKBONE CABLING REQUIREMENTS 7. Additional Performance Requirements: a. Length: 2.23 inches b. Operating Temperature: -40 to 85 degrees C 8. Basis of Design: a. Multimode Optical Fiber Pigtails shall be from the same manufacturer as used for the fiber optic termination equipment. 2.3 OPTICAL FIBER BACKBONE PERFORMANCE A. OM3 Multimode (MM): 1. Fiber Type: Multimode; doped silica core surrounded by a concentric glass cladding. 2. Index Profile: Graded Index. 3. Transmission Windows: 850-nm and 1300-nm. 4. Core Diameter (nom): 50-èm (microns) ±± 2.5. 5. Cladding Diameter: 125-èm ±± 1. 6. Core-clad Concentricity: ä? 1.0-èm. 7. Cladding Non-circularity: ä? 1.0%. 8. Fiber Coating Diameter: a. 245-èm ±± 10 (primary coating). b. 900-èm (nominal) secondary coating (tight buffer) c. All coatings shall be mechanically strippable without damaging the optical fiber. 9. Attenuation (maximum @ 23 ±± 5°C; backbone): a. @ 850-nm: 3.0 dB/km. b. @ 1300-nm: 1.0 dB/km. c. @ 1300-nm thru 1380-nm: 1.0dB/km 1) When tested in accordance with FOTP-3, "Procedure to Measure Temperature Cycling Effects on Optical Fibers, Optical Cable, and Other Passive Fiber Optic Components," the average change in attenuation over the rated temperature range of the optical cable shall not exceed 0.50 dB/km with 80% of the measured fibers not exceeding 0.25 dB/km. 10. Bandwidth (minimum): a. @ 850-nm: 2000 MHz*km. b. @ 1300-nm: 500 MHz*km. 11. No optical fiber shall show a point discontinuity greater than 0.2 dB at the specified wavelengths. Such a discontinuity or any discontinuity showing a reflection at that point shall be cause for rejection of that optical fiber by the Owner. 1003 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 13 00 - 5 BACKBONE CABLING REQUIREMENTS B. Singlemode (SM): 1. Fiber Type: Singlemode; doped silica core surrounded by a concentric glass cladding. 2. Core Diameter: 8 to 9 µm. All optical fibers shall be of the same nominal core diameter and profile. 3. Cladding Diameter: 125 ±± 1.0 µm. 4. Cladding Non-circularity: ä? 1%. 5. Core to Cladding Offset: ä? 0.8 µm. 6. Fiber Coating Diameter: a. 245 ±± 15µm (primary coating). b. 900-nm (nominal) secondary coating (tight buffer). c. All coatings shall be mechanically strippable without damaging the optical fiber. 7. Cut-off Wavelength (cabled fiber; ìccf) ä? 1260-nm. 8. Mode Field Diameter: 8.3 to 9.8 m at 1300-nm; 10.5 ±± 1.0 µm at 1550-nm. 9. Zero Dispersion Wavelength (ì0): 1301.5 nm less than l0 less than 1321.5 nm. 10. Zero Dispersion Slope (S0): Less than 0.092 ps/nm2*km. 11. Fiber Attenuation (maximum @ 23 ±± 5°C; Backbone): a. @ 1300-nm: 2.0 dB/km b. @ 1550-nm: 1.75 dB/km 1) When tested in accordance with FOTP-3, "Procedure to Measure Temperature Cycling Effects on Optical Fibers, Optical Cable, and Other Passive Fiber Optic Components," the average change in attenuation over the rated temperature range of the optical fiber cable shall not exceed 0.05 dB/km at 1550-nm. The magnitude of the maximum attenuation change of each individual optical fiber shall not be greater than 0.15 dB/km at 1550-nm. 12. Fiber Dispersion (maximum): a. @ 1285 to 1330-nm: 3.2-ps/nm*km b. @ 1550-nm: 18-ps/nm*km 13. No optical fiber shall show a point discontinuity greater than 0.1 dB at the specified wavelengths. Such a discontinuity or any discontinuity showing a reflection at that point shall be cause for rejection of that optical fiber by the Owner. 1004 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 13 00 - 6 BACKBONE CABLING REQUIREMENTS PART 3 - EXECUTION 3.1 CABLE INSTALLATION REQUIREMENTS A. Cable slack shall be provided in each backbone fiber optic cable. This slack is exclusive of the length of fiber that is required to accommodate termination requirements and is intended to provide for cable repair and/or equipment relocation. The cable slack shall be stored in a fashion as to protect it from damage and be secured in the termination enclosure or a separate enclosure designed for this purpose. Multiple cables may share a common enclosure. B. A minimum of 5 meters (approximately 15 feet) of slack cable (each cable if applicable) shall be coiled and secured at both ends located in the entrance room, Telecommunications Room or main equipment room, for backbone and intra-building cable. C. Where exposed, all backbone fiber optic cable shall be installed in protective inner duct. This includes areas where the cable is routed in cable tray and where making a transition between paths (e.g., between conduit and cable tray or into equipment racks). The inner duct should extend into the termination and/or storage enclosure(s) at system endpoints. 3.2 CROSS-CONNECTS A. The Owner will be responsible for all cross-connects between the data backbone cabling and network electronics and between the data network electronics and horizontal cabling. B. The Owner shall be responsible for the cross-connect wiring between the horizontal and backbone voice cabling. C. This Contractor shall be responsible for cross-connects between the cabling terminations at the Entrance Room and the telephone utility network point-of-presence. It shall be the responsibility of the Contractor, to work with the Owner and provide the necessary assistance to allow Owner and/or telephone company personnel to make the necessary connections to establish service on the new cable system. These activities include, but are not limited to cross-connect documentation, general wiring overview and cable pair identification. END OF SECTION 27 13 00 1005 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 15 00 - 1 HORIZONTAL CABLING REQUIREMENTS SECTION 27 15 00 HORIZONTAL CABLING REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. This section describes the products and execution requirements relating to furnishing and installing horizontal communications cabling and termination components and related subsystems as part of a cabling plant. The cabling plant consists of copper cabling. 1.2 RELATED WORK A. Section 27 05 00 - Basic Communications Systems Requirements B. Section 27 17 20 - Structured Cabling System Warranty 1.3 QUALITY ASSURANCE A. Refer to Section 27 05 00 for relevant standards and plenum or non-plenum cable requirements. B. The channel shall be required to meet the performance requirements indicated herein. The manufacturer shall warranty the performance of their system to the required performance (and not just to the Standard, should the required performance exceed the Standard). C. Specific components of the channel shall be required, at a minimum, to meet the Standard component requirements for that particular component. D. The installing contractor must be certified by the manufacturer of the structured cabling system. 1.4 SUBMITTALS A. Under the provisions of Section 27 05 00 and Division 1, prior to the start of work the Contractor shall submit: 1. Manufacturer's data covering all products proposed, including construction, materials, ratings and all other parameters identified in Part 2 - Products, below. 2. Manufacturer's installation instructions. 1006 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 15 00 - 2 HORIZONTAL CABLING REQUIREMENTS PART 2 - PRODUCTS 2.1 HORIZONTAL CABLE A. CAT 6A Cable: 1. The horizontal cable requirements must be met, as well as the following channel requirements. 2. CAT 6A cable shall terminate on rack-mounted modular patch panels in their respective communication equipment room as indicated on the drawings. 3. Cable shall exceed transmission requirements listed in ANSI/TIA/EIA-568-C.2. Performance tests shall be conducted using swept frequency testing through 500 MHz for the channel. All numbers given are for a 4-connection channel. Discrete frequency testing results at 500 MHz is not acceptable. 4. Performance tests shall be conducted using swept frequency testing through 500 MHz for the channel. All numbers given are for a 4-connection channel. Discrete frequency testing results at 500 MHz is not acceptable. 5. Performance data shall be provided by third-party independent testing laboratories only. Testing data shall be submitted on the third-party testing laboratory letterhead. Test data will only be accepted if it displays testing as a channel. Electrical characteristics of the performance of the cable itself will not satisfy this requirement. 6. The structured cabling and connectivity may be provided by the same company. For the purpose of this specification that shall mean that the cabling and connectivity must be marketed, branded, supported, warranted, and distributed by the same company. Specifically, ally or partnerships between cabling manufacturers and connectivity manufacturers do not meet this requirement unless otherwise listed in Section 27 17 20 as an acceptable manufacturer. Specifically, products made by others through an OEM relationship are acceptable if the products are marketed, branded, supported, warranted, and distributed by the same company. 7. The 4-connector channel performance margins in the table below shall be guaranteed margins above ANSI/TIA/EIA-568-C.2: Electrical Value (1 - 500 MHz) Minimum Margin Insertion Loss: 3% NEXT: 2 dB PS NEXT: 3 dB PSA NEXT: 3 dB PSA NEXT (Average): ACR-F: 2 dB PS ACR-F: 3 dB PSA ACR-F: 3 dB PSA ACR-F (Average): 3 dB Return Loss: 2 dB 1007 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 15 00 - 3 HORIZONTAL CABLING REQUIREMENTS 8. The jacket color for CAT 6A cable shall be blue for all applications. 9. Basis of Design: a. CommScope 2.2 FACEPLATES/JACKS A. Cat 6A Jacks: 1. CAT 6A horizontal cable shall each be terminated at its designated work area location on RJ-45 modular jacks. These modular jack assemblies shall snap into a modular mounting frame. The combined modular jack assembly is referred to as an information outlet. 2. The same orientation and positioning of modular jacks shall be utilized throughout the installation. Prior to installation, the Contractor shall submit the proposed configuration for each information outlet type for review by the Architect/Engineer. 3. Information outlet faceplates shall incorporate recessed designation strips at the top and bottom of the frame for identifying labels. Designation strips shall be fitted with clear plastic covers. 4. Where standalone CAT 6A only modular jacks are identified, the information outlet faceplate shall be configured as to allow for the addition of one (1) additional modular jack to be installed to supplement each such modular jack as defined by this project. The installation of these supplemental modular jacks is NOT part of this project. 5. Any unused modular jack positions on an information outlet faceplate shall be fitted with a removable blank inserted into the opening. 6. The information outlet faceplate shall be constructed of high impact plastic (except where noted otherwise). The information outlet faceplate color shall: a. Match the receptacle color used for other utilities in the building, or b. When installed in surface raceway (if applicable), match the color of that raceway. 7. Different faceplate and frame designs for locations, which include optical fiber cabling relative to those, that terminate only copper cabling are acceptable. Information outlets that incorporate optical fiber shall be compliant with the above requirements plus: a. Be a low-profile assembly. b. Incorporate a mechanism for storage of cable and fiber slack needed for termination. c. Position the optical fiber couplings to face downward or at a downward angle to prevent contamination. d. Incorporate a shroud that protects the optical fiber couplings from impact damage. 8. All information outlets and the associated modular jacks shall be of the same manufacturer throughout the project. 9. The CAT 6A modular jacks shall be non-keyed 8-pin modular jacks. 1008 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 15 00 - 4 HORIZONTAL CABLING REQUIREMENTS 10. The interface between the modular jack and the horizontal cable shall be an angled insulation displacement type contact and shall provide separation for ANEXT suppression. Termination components shall be designed to maintain the horizontal cable's pair twists as closely as possible to the point of mechanical termination. 11. CAT 6A modular jacks shall be pinned per TIA-568B. 12. CAT 6A termination hardware shall, as a minimum, meet all the mechanical and electrical performance requirements of the following standards: a. ANSI/TIA/EIA-568-B.2-10 b. IEEE 802.af (PoE) c. IEEE 802.an 10GBASE-T d. ISO/IEC 60603-7 e. ISO 11801 Class E Compliant f. FCC PART 68.5 SUBPART F 13. The color for CAT 6A jacks shall be applications and blue for data applications. 2.3 COPPER WORK AREA CORDS A. RJ-45: 1. Provide the same quantity of Category 6A copper work area cords as copper patch panel cords specified in Section 27 11 00. Copper work area cords shall be equipped with an 8-pin modular RJ-45 connector on each end. 2. Work area cords shall be 10' in length. 3. Manufacturer of copper patch cable shall be the same as the manufacturer of the horizontal copper cable. PART 3 - EXECUTION 3.1 CABLE INSTALLATION REQUIREMENTS A. Horizontal Cabling: 1. The maximum horizontal cable drop length for Data UTP shall not exceed 295 feet (90 meters) in order to meet data communications performance specifications. This length is measured from the termination panel in the wiring closet to the outlet and must include any slack required for the installation and termination. The Contractor is responsible for installing horizontal cabling in a fashion so as to avoid unnecessarily long runs. Any area that cannot be reached within the above constraints should be identified and reported to the Architect/Engineer prior to installation. Changes to the contract documents shall be approved by the Architect/Engineer. 2. All cable shall be free of tension at both ends. In cases where the cable must bear some stress, Kellum grips may be used to spread the strain over a longer length of cable. 3. Manufacturer's minimum bend radius specifications shall be observed in all instances. 1009 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 15 00 - 5 HORIZONTAL CABLING REQUIREMENTS 4. Horizontal cabling installed as open cabling shall be supported at a maximum of 5' between supports. Refer to the specifications for required cable supports. 5. Horizontal cabling installed as open cable or in cable tray shall be bundled at not less than 10' intervals with hook-and-loop tie wraps. The use of plastic cable ties is strictly prohibited. 6. The maximum conduit fill for horizontal cabling shall not exceed 40% regardless of conduit length. 7. Cable sheaths shall be protected from damage from sharp edges. Where a cable passes over a sharp edge, a bushing or grommet shall be used to protect the cable. B. A coil of 3 feet in each cable shall be placed in the ceiling at the last support (e.g., J- hook, bridle ring, etc.) before the cables enter a fishable wall, conduit, surface raceway or box. At any location where cables are installed into movable partition walls or modular furniture via a service pole, approximately 15-feet of slack shall be left in each horizontal cable under 250 feet in length to allow for change in the office layout without re-cabling. These "service loops" shall be secured at the last cable support before the cable leaves the ceiling and shall be coiled from 100% to 200% of the cable recommended minimum bend radius. 1. Category 6A cables shall not be mixed with any other category cable in any bundle. Bundles of Category 6A cable shall maintain a 0.5" separation from bundles of cables containing different categories (e.g., Cat 6, Cat 5E). 2. To reduce or eliminate EMI, the following minimum separation distances from 480V power lines shall be adhered to: a. Twelve (12) inches from power lines of less than 5-kVa. b. Eighteen (18) inches from high-voltage lighting (including fluorescent). c. Thirty-nine (39) inches from power lines of 5-kVa or greater. d. Thirty-nine (39) inches from transformers and motors. 3. Information outlets shown on floor plans with the subscript "W" are intended to be used for wall mounted telephones. Back boxes for wall mounted telephones shall not be located within 12" vertically, or horizontally, from any light switches, power receptacles, nurse call devices, thermostats, or any other architectural element that would otherwise prevent the installation of a wall mounted telephone on the mating lugs. C. Horizontal Cabling in Modular Furniture: 1. This Contractor shall be responsible for providing and installing cable completely to the information outlet in the furniture. This Contractor's responsibility does not end at the furniture feed point. 2. Where furniture panels are installed to include contact with a wall, cabling shall be fed to the furniture panels via conduit. 3. Cabling shall be protected in the transition from the floor or wall fittings to the modular furniture via a length of flexible plastic conduit or other approved protective means. Conduit fittings shall be compatible with the Floor and Wall Fittings proposed. There shall be no exposed cable in the transition to the modular furniture. Fill ratio (cable area vs. conduit area) in each feed shall not exceed 40%. 1010 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 15 00 - 6 HORIZONTAL CABLING REQUIREMENTS 4. For purposes of bidding, it is to be assumed that the cable pathway shall be limited to the bottom panel of the modular furniture only. Communications cables would be run through these channels to the jack location. 5. For purposes of bidding, it is to be assumed that it will be the responsibility of the Contractor to punch and reinstall the bottom molding panels on the modular furniture as required to accommodate the communications cabling and information outlets. The panels shall be marked prior to installation by the Owner to identify the desired location of the information outlets. 6. The information outlet shall be secured to the panel via mounting tabs, pop- rivets, screws or other approved method. Use of adhesive tape is not acceptable. The method of securing the information outlet to the panel shall not result in sharp protrusions (e.g., sheet metal screw tip) into the channel behind the panel. 3.2 CABLE TERMINATION REQUIREMENTS A. Cable Terminations - Data UTP: 1. Modular patch panels shall be designed and installed in a fashion as to allow future horizontal cabling to be terminated on the panel without disruption to existing connections. 2. If the "last" patch (per rack) is greater than 50% utilized, one additional patch panel shall be provided for future use. 3. At information outlets and modular patch panels, the Contractor shall ensure that the twists in each cable pair are preserved to within 0.5-inch of the termination for data cables. The cable jacket shall be removed only to the extent required to make the termination. END OF SECTION 27 15 00 1011 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 17 10 - 1 TESTING SECTION 27 17 10 TESTING PART 1 - GENERAL 1.1 SECTION INCLUDES A. This section describes the testing requirements relating to the structured cabling system and its termination components and related subsystems. 1.2 RELATED WORK A. Section 27 05 00 - Basic Communications Systems Requirements 1.3 QUALITY ASSURANCE A. Refer to Section 27 05 00 for relevant standards. 1.4 SUBMITTALS A. Under the provisions of Section 27 05 00 and Division 1, prior to the start of work, the Contractor shall submit: 1. Complete information on testing procedure as described herein. 2. Test plan summary for each cable type to be tested including equipment to be used, setup, test frequencies or wavelengths, results format, etc. PART 2 - PRODUCTS 2.1 TESTING COPPER A. General Requirements: 1. Perform acceptance tests as indicated below for each sub-system (e.g., backbone, horizontal, etc.) as it is completed. 2. Supply all equipment and personnel necessary to conduct the acceptance tests. The method of testing shall be approved by the Architect/Engineer. 3. Visually inspect all cabling and termination points to ensure that they are complete and conform to the wiring pattern defined herein. Provide the Architect/Engineer with a written certification that this inspection has been made. 4. Conduct acceptance testing according to a schedule coordinated with the Owner/Architect/Engineer. Representatives of the Owner may be in attendance to witness the test procedures. Provide a minimum of one (1) week's advance notice to the Architect/Engineer to allow for such participation. The notification shall include a written description of the proposed conduct of the tests, including copies of blank test result sheets to be used. 1012 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 17 10 - 2 TESTING 5. Tests related to connected equipment of others shall only be done with the permission and presence of the Contractor involved. The Contractor shall ascertain that testing only is required to prove the wiring connections are correct. 6. Provide test results and describe the conduct of the tests including the date of the tests, the equipment used, and the procedures followed. At the request of the Architect/Engineer, provide copies of the original test results in their native format. 7. All cabling shall be 100% fault-free unless noted otherwise. If any cable is found to be outside the specification defined herein, that cable and the associated termination(s) shall be replaced at the expense of the Contractor. The applicable tests shall then be repeated. 8. Should it be found by the Architect/Engineer that the materials or any portion thereof furnished and installed under this Contract fail to comply with the specifications and drawings with respect or regard to the quality, amount, or value of materials, appliances, or labor used in the work, it shall be rejected and replaced by the Contractor and all work disturbed by changes necessitated in consequence of said defects or imperfections shall be made good at the Contractor's expense. a. CAT 6A Cable: 1) Testing shall be from the modular jack at the information outlet to the modular patch panel in the communication equipment room. 2) Horizontal cable shall be free of shorts within the pairs and be verified for continuity, pair validity and polarity, and conductor position on the modular jack (e.g., wire map). Any defective, split, or mis-positioned pairs must be identified and corrected. 3) CAT 6A horizontal cable shall be tested to 500 MHz as defined by TIA/EIA-568-C.2. Measurements shall be of the "Channel Link", including patch cords, cabling and modular jacks at the information outlet and modular patch panel. Parameters to be tested must include: a) Wire Map b) Length c) NEXT Loss (Pair-to-Pair) d) NEXT (Power Sum) e) ELFEXT (Pair-to-Pair) f) ELFEXT (Power Sum) g) Return Loss h) Attenuation i) Propagation Delay j) Delay Skew 4) The maximum length of horizontal cable shall not exceed 295 feet, which allows 33 feet for technology equipment and modular patch cords. 1013 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 17 10 - 3 TESTING 5) To establish testing baselines, cable samples of known length and of the cable type and lot installed shall be tested. The cable may be terminated with an eight-position CAT 6A modular connector (8-pin) to facilitate testing. Nominal Velocity of Propagation (NVP) and nominal attenuation values shall be calculated based on this test and be used during the testing of the installed cable plant. This requirement can be waived if NVP and nominal attenuation data is available from the cable manufacturer for the exact cable type under test. 6) CAT 6A horizontal cable testing shall be performed using a test instrument designed for testing to 500 MHz or higher. Test records shall verify "PASS" on each cable and display the specified parameters, comparing test values with standards based "templates" integral to the unit. Test records that report a PASS*, FAIL*, or FAIL result for any of the parameters will not be accepted. 7) In the event results of the tests are not satisfactory, the Contractor shall make adjustments, replacements, and changes as necessary and shall then repeat the test or tests that disclosed faulty or defective material, equipment, or installation methods, and shall make additional tests as the Architect/Engineer deems necessary at no additional expense to the project or user agency. 2.2 TESTING FIBER A. General Requirements: 1. Perform acceptance tests as indicated below for each optical fiber sub-system (e.g., backbone, horizontal, etc.) as it is completed. 2. Supply all equipment and personnel necessary to conduct the acceptance tests. The method of testing shall be approved by the Architect/Engineer. 3. Visually inspect all optical fiber cabling and termination points to ensure that they are complete and conform to the standards defined herein. Provide the Architect/Engineer with a written certification that this inspection has been made. 4. Conduct acceptance testing according to a schedule coordinated with the Owner/Architect/Engineer. Representatives of the Owner may be in attendance to witness the test procedures. Provide a minimum of one (1) week's advance notice to the Architect/Engineer to allow for such participation. The notification shall include a written description of the proposed conduct of the tests, including copies of blank test result sheets to be used. 5. Tests related to connected equipment of others shall only be done with the permission and presence of the Contractor involved. The Contractor shall ascertain that testing only is required to prove that the optical fiber connections are correct. 6. Provide test results and describe the conduct of the tests including the date of the tests, the equipment used and the procedures followed. At the request of the Architect/Engineer, provide copies of the original test results. 7. All optical fiber cabling shall be 100% fault-free unless noted otherwise. If any optical fiber cable is found to be outside the specification defined herein, that optical fiber cable and the associated connector(s) shall be replaced at the expense of the Contractor. The applicable tests shall then be repeated. 1014 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 17 10 - 4 TESTING 8. Should it be found by the Architect/Engineer that the materials or any portion thereof furnished and installed under this Contract fail to comply with the specifications and drawings with respect or regard to the quality, amount, or value of materials, appliances, or labor used in the work, it shall be rejected and replaced by the Contractor and all work disturbed by changes necessitated in consequence of said defects or imperfections shall be made good at the Contractor's expense. 9. The optical fibers utilized in the installed cable shall be traceable to the manufacturer. Upon request by the Owner, provide cable manufacturer's test report for each reel of cable provided. These test reports shall include manufacturer's on-reel attenuation test results at 850-nm and 1300-nm for each optical fiber of each reel prior to shipment from the manufacturer. a. On-the-reel bandwidth performance as tested at the factory. Factory data shall be provided upon request. b. The testing noted for optical fiber cabling utilizes an Optical Time Domain Reflectometer (OTDR). However, the Contractor may submit to the Architect/Engineer for pre-approval of alternate fiber optic testing equipment. B. Tests Prior to Installation: The Contractor, at their discretion and at no cost to the Owner, may perform an attenuation test with an OTDR at 850-nm or 1300-nm on each optical fiber of each cable reel prior to installation. Supply this test data to the Architect/Engineer prior to installation. C. Tests After Installation: Upon completion of cable installation and termination, the optical fiber cabling shall be tested to include: 1. Optical Attenuation ("Insertion Loss" Method): a. Optical Attenuation shall be measured on all terminated optical fibers in one direction of transmission using the "Insertion Loss" method measurement in accordance with the TIA/EIA 526-14, Method B, and be inclusive of the optical connectors and couplings installed at the system endpoints. Access jumpers shall be used at both the transmit and receive ends to ensure that an accurate measurement of connector losses is made. Multimode optical fibers shall be tested at 850 ±± 30 nm. Singlemode optical fibers (if applicable) shall be tested at 1300 ±± 20 nm. b. Attenuation of optical fibers shall not exceed the values calculated as follows: 1) Attenuation (max.) = 2*C+L*F+S dB. 2)Where C is the maximum allowable Connector Loss (in dB), L is the length of the run (in kilometers), and F is the maximum allowable optical fiber loss (in dB/km). S is the total splice loss (# of splices * maximum attenuation per splice). 1015 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 17 10 - 5 TESTING 2. Verification of Link Integrity (OTDR): a. All optical fibers shall be documented in one direction of transmission using an Optical Time Domain Reflectometer (OTDR). Multimode optical fibers shall be tested at 850-nm and 1300-nm (nominal). Singlemode optical fibers (if applicable) shall be tested at 1310-nm and 1550-nm (nominal). The OTDR(s) shall incorporate high-resolution optics optimized for viewing of short cable sections. Access jumpers of adequate length to allow viewing of the entire length of the cable, including the connectors at the launch and receive end, shall be used. Access jumpers used for testing shall match the type and core diameter of the fiber optic strand under test. b. Set OTDR's test variables to the manufacturer's published backscatter coefficient and velocity of propagation figure for the specific strand of fiber under test. OTDR's range should be set to approximately 1.5 times the length of the strand under test, pulse width should be optimized for the length of the fiber optic strand under test, and number of averages should be adjusted to approximately 120 seconds per wavelength. c. OTDR traces revealing a point discontinuity greater than 0.2 dB in a multimode optical fiber or 0.1 dB in a singlemode optical fiber (if applicable) at any of the tested wavelengths or any discontinuity showing a reflection at that point shall be a valid basis for rejection of that optical fiber by the Owner. The installation of that optical fiber cable shall be reviewed in an effort to remove any external stress that may be causing the fault. If such efforts do not remove the fault, that optical fiber cable and the associated terminations shall be replaced at the expense of the Contractor. 2.3 DOCUMENTATION/AS-BUILTS/RECORDS A. General: 1. Upon completion of the installation, submit as-builts per the requirements of Section 27 05 00 and Division 1. Documentation shall include the items detailed in the subsections below. 2. All documentation, including hard copy and electronic forms, shall become the property of the Owner. 3. The Architect/Engineer may request that a 10% random field retest be conducted on the cable system at no additional cost to verify documented findings. Tests shall be a repeat of those defined above. If findings contradict the documentation submitted by the Contractor, additional testing can be requested to the extent determined necessary by the Architect/Engineer, including a 100% retest. This retest shall be at no additional cost to the Owner. B. Copper Media Test Data: 1. Test results shall include a record of test frequencies, cable type, conductor pair and cable (or Outlet) I.D., measurement direction, test equipment type, model and serial number, date, reference setup, and crew member name(s). 1016 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 17 10 - 6 TESTING 2. Printouts generated for each cable by the wire test instrument shall be submitted as part of the documentation package. The Contractor shall furnish this information in electronic form (USB thumb drive). The thumb drive shall contain the electronic equivalent of the test results as defined by the bid specification and be in the tester's native format as well as summaries of each test in pdf format. Provide a licensed copy of the software required to view and print the data that is provided in a proprietary format. Furnish one (1) copy of the data and display (if applicable) software. C. Optical Fiber Media Test Data: 1. Test results shall include a record of test wavelengths, cable type, fiber and cable (or Outlet) I.D., measurement direction, test equipment type, model and serial number, date, reference setup, and crew member name(s). 2. OTDR traces of individual optical fiber "signatures" obtained as specified above shall be provided to the Architect/Engineer in electronic form for review. Trace files shall be so named as to identify each individual optical fiber by location in the cable system and optical fiber number or color. Where traces are provided in electronic form, provide along with the above documentation, one (1) licensed copy of software that will allow for the display of OTDR traces provided. The software shall run on a Microsoft Windows-based personal computer. D. Record Drawings: 1. The drawings are to include cable routes and outlet locations. Outlet locations shall be identified by their sequential number as defined elsewhere in this document. Numbering, icons, and drawing conventions used shall be consistent throughout all documentation provided. PART 3 - EXECUTION (Not Used) END OF SECTION 27 17 10 1017 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 1 PROFESSIONAL AUDIO/VIDEO SYSTEM SECTION 27 41 00 PROFESSIONAL AUDIO/VIDEO SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. System Components B. Audio Connectors C. Audio Cabling D. Video Connectors E. Analog Video Cabling F. Digital Video Cabling G. Control Cabling H. Horizontal Copper and Fiber Cabling and Connectors 1.2 RELATED WORK A. Section 26 05 33 - Conduit B. Section 26 05 13 - Wire and Cable C. Section 27 05 00 - Basic Communications Requirements D. Section 27 05 26 - Communications Bonding E. Section 27 05 03 - Through Penetration Firestopping F. Section 27 11 00 - Communication Equipment Rooms G. Section 27 05 28 - Interior Communications Pathway H. Section 27 15 00 - Horizontal Cabling Requirements 1.3 QUALITY ASSURANCE A. Manufacturer: The manufacturer of equipment shall have a complete service organization for all products in the manufacturer's line. 1018 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 2 PROFESSIONAL AUDIO/VIDEO SYSTEM B. Integrator/Dealer: The Contractor shall be a factory-authorized and certified integrator/dealer specializing in each selected manufacturer's products, with demonstrated prior experience with the selected manufacturer's system installation and programming. C. The following qualifications have been endorsed by the AudioVisual and Integrated Experience Association (AVIXA), which is formerly known as InfoComm International. 1. The Contractor shall have a Certified Technology Specialist with a specialized Installation endorsement (CTS-I) and or a Certified Technology Specialist with a specialized Design endorsement (CTS-D) on staff and supervising the project. D. Control System Dealer: The media control system shall be provided, terminated, installed, and programmed by a factory-authorized and certified dealer and integrator in good standing with the manufacturer. The dealer shall have direct purchasing and support authority. These services shall not be subcontracted. E. Control System Programmer: The media control system shall be programmed by a factory-trained and certified programmer. 1. Should the installer of the system not employ a factory-trained and certified programmer, a representative from the equipment manufacturer or certified independent programmer shall be retained for programming services. The Contractor shall be responsible for payment of his/her services until the job is complete and signed off. 2. The Contractor shall have all certifications required by the manufacturer(s) for the installed system components on staff for the appropriate duties and responsibilities required by the manufacturer. a. The control system programmer shall have all refresher courses completed for the latest features of the control platform prior to bidding the project to ensure that the Contractor is up to date with the latest software features. 3. The Contractor shall be fluent in the control systems preferred language (e.g., Python, C#, Java, JavaScript, SQL, PHP, etc.) required to complete the programing requirements of the AV system. a. Other languages may be required to integrate with other systems, such as the HVAC and lighting system. The Contractor shall coordinate the programming services with the on-site contractor for the integrated system. The Contractor shall hire the services of a certified contractor to program these other systems as required by the manufacturer of these other systems. F. Audio System Programmer: All digital sound processing equipment (DSP) used on the project shall be setup, programmed and calibrated by a factory-trained and certified technician. The audio system programmer shall have the following complementary certifications: 1. Associated manufacturer certifications 1019 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 3 PROFESSIONAL AUDIO/VIDEO SYSTEM G. Video System Programmer: All video distribution and processing used on the project shall be setup, programmed and calibrated by a factory-trained and certified technician. H. The Contractor shall have acquired and maintained all certifications for a minimum of one (1) month prior to the posted bid date of this project. I. Servicing Contractor: The installer must be factory certified to provide service on the installed manufacturer's equipment and must have local service representatives within a 100 mile radius of the project site. 1.4 REFERENCES A. ADA - Americans with Disabilities Act B. ADAAG - Americans with Disability Accessibility Guidelines C. ANSI - American National Standards Institute D. AVIXA - Audiovisual and Integrated Experience Association (Formerly InfoComm) E. ANSI/InfoComm A102.01:2017 - Audio Coverage Uniformity F. ANSI/InfoComm 2M-2010 - Standard Guide for Audiovisual Systems Design and Coordination Processes G. ANSI/InfoComm F501.01:2015 - Cable Labeling for Audiovisual Systems H. ANSI/InfoComm 10:2013 - Audiovisual Systems Performance Verification I. ANSI/AVIXA V202.01:2016 - Display Image Size for 2D Content in Audiovisual Systems J. ANSI/InfoComm 3M-2011 - Projected Image System Contrast Ratio K. IBC - International Building Code L. IEC - International Electrotechnical Commission M. NFPA 70 - National Electrical Code (NEC) N. UL 813 - Commercial Audio Equipment O. UL 1419 - Professional Video and Audio Equipment P. UL 1480 - Speakers for Fire Alarm, Emergency, and Commercial and Professional Use Q. UL 1492 - Audio/Video Products and Accessories R. CBC - California Building Code (Current Version) 1020 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 4 PROFESSIONAL AUDIO/VIDEO SYSTEM 1.5 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 27 05 00. B. General Requirements: 1. Submittals will be submitted in multiple passes over the course of construction. Each pass will be a dedicated single submission for review as outlined in the general submittal requirements outlined in section 27 05 00. 2. Upon acceptance of an item in the submittal, the Contractor shall remove them from future resubmittals of the same submittal "pass". 3. Should the Contractor not provide shop drawings in a timely fashion, not complete requirements, or extend the time of any resubmittals so as to jeopardize schedules, cause delay, or limit access for field work, the Contractor bears responsibility for impact and delay that may occur. This includes access or lift to overhead positions and associated protection of work already in place. C. First Pass Submittals: To be submitted after the project is awarded but before equipment is submitted, purchased and installed. 1. Contractor(s) resume of qualifications. 2. All certifications shall be current and valid. Any certificate with expired dates will not be accepted. 3. All applicable AudioVisual and Integrated Experience Association (AVIXA) certifications. Qualifications from InfoComm that have not expired will be accepted. 4. All certifications outlined in the qualifications shall be included in this submittal. Refer to the qualifications section for additional information. Certifications include, but are not limited to: a. All installed manufacturer certifications required by the manufacturer. b. Control system authorized dealer certification. c. Control system certified programmer certification(s). d. Audio system DSP dealer certification. e. Audio system DSP programmer certification. f. Professional audio components dealer certification(s). g. Video system dealer certification(s). h. All other applicable dealer, installation and programming certifications. i. All applicable networking certifications. 5. If an alternate manufacturer(s) is submitted, the equivalent certifications to the basis of design manufacturer(s) shall be required and submitted. 6. Audio and video calibration equipment certifications. 7. Audio and video testing and calibration equipment and software procedures and manufacturer-specific equipment calibration certificates. D. Second Pass Submittals: To be submitted after all initial submittals have been approved but before equipment is purchased, installed, configured, and programmed. This can be submitted with the first pass submittal but will require to be submitted as a separate document. 1021 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 5 PROFESSIONAL AUDIO/VIDEO SYSTEM 1. Alternate System Drawings: If an approved alternate manufacturer is submitted, the Contractor shall provide project-specific system CAD drawings. These will be required to be submitted with the product data. a. Provide a system block diagram noting system components and interconnection between components. The interconnection of components shall clearly indicate all wiring required in the system. When multiple pieces of equipment are required in the exact same configuration (e.g., multiple identical controllers), the diagram may show one device and refer to the others as "typical" of the device shown. 2. Product Data: Provide manufacturer's technical product specification sheet for each individual component type. Submitted data shall show the following: a. Compliance with each requirement of these documents. b. All component options and accessories specific to this project. c. Electrical power consumption rating and voltage. d. Wiring requirements. e. Pre-terminated cable distances and requirements identified by each room where required. f. Product manuals are not an acceptable format and will be rejected. E. Final Pass Submittals: To be submitted after all initial submittals have been approved but before the equipment is installed, configured and programmed. These should not be submitted until after the pre-installation meeting outlined in Part 3. 1. System Drawings: Project-specific system drawings shall be provided as follows: a. Provide a system block diagram noting system components and interconnection between components. The interconnection of components shall clearly indicate all wiring required in the system. When multiple pieces of equipment are required in the exact same configuration (e.g., multiple identical controllers), the diagram may show one device and refer to the others as "typical" of the device shown. b. Submittals shall contain shop drawings indicating physical plan locations and placement of installed devices and accessories with associated scope or field conditions for review and coordination. Provide mounting details, suspensions, and rough-in notes with trade demarcations. 1) Identify any non-standard back boxes or mounting assembly required by product or specifications and elaborate contractor means and methods for mounting. 2) Provide rack drawing(s) showing the mounting of equipment in each rack or cabinet on the project. Racks should be numbered and coordinated with all relevant trades sharing rack space. 3) All display mounts shall be coordinated with the Architect to verify the exact vertical and horizontal positioning of the display. Coordinate in- wall stud locations for installation of recessed display mounts to install in the exact location as coordinated with the architectural drawings. 1022 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 6 PROFESSIONAL AUDIO/VIDEO SYSTEM 4) Projector mounts, projector screens, recessed ceiling speakers, in- ceiling microphones, and all other above ceiling devices shall be coordinated with other trades in the field (e.g., mechanical ductwork, lights, diffusers, etc.) to minimize changes that will impact the performance of the system design. c. Submit wiring and cable path requirements, including field wiring, path verification, signal separation, and outside diameter of cables for conduit sizing and verification that can be used for field installation and electrical coordination. d. Reproduction of contract documents is not acceptable for submittals. Wire CAD type drawings and cable tag lists or schedules, or typical manufacturer's abbreviated single lines alone, are not complete. 2. The Contractor shall submit graphic or emulated representations of the control system touch panels for each unique space and layout prior to purchase, installation and programming for review and comment by the Architect/Engineer and Owner. These shall show and describe the intended programming/macro control features and functions of each button/icon for all pages. 3. The Contractor shall submit graphic or emulated representations of the control system keypads for each unique space and layout prior to purchase, installation and programming for review and comment by the Architect/Engineer and Owner. These shall show and describe the intended programming/macro control features and functions of each button/knob. 4. The Contractor shall submit the actual DSP audio processor files or single line audio path file diagram prior to installation for review and comment by the Architect/Engineer. Provide preliminary settings with processor blocks identified and note resources allocated. 5. The Contractor shall submit the number of IP addresses, VLANS, and subnetworks that will be required from the Owner's Information Systems Department. 6. Submit meeting agenda for planning/programming meetings as required in Part 3 of this specification. 7. Submit detailed description of Owner training to be conducted at project end, including specific training times and typical attendees expected. 8. Provide rack drawing(s) showing the mounting of equipment in each rack or cabinet on the project. Rack drawings shall include the following: a. Equipment placement including mounting on the front or rear of the rack. b. Spacing separation as required by equipment for adequate airflow and heat dissipation. c. Signal separation based on AVIXA standards as required by the design. d. Heating/cooling load requirements for submitted equipment to verify the heating/cooling load of the rack. This shall include Owner-provided equipment coordinated with the Owner. e. Power requirements for each rack including plug type and loads based on the final approved products. 9. A console and equipment rack plan shall be provided showing console, countertop, rough-in, cable paths, and wall plates with dimensions in plan view and elevation. The plan shall include equipment layout within the console and rack. 1023 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 7 PROFESSIONAL AUDIO/VIDEO SYSTEM 10. Submit the detailed engineered and coordinated mounting solution(s) for wall- mounted and ceiling-mounted devices including the following items: a. Surface-mounted and/or flown loudspeakers. b. Video displays including blocking or ceiling span requirements, height from finished floor, and back box location. 11. If an alternate loudspeaker design is going to be utilized, the Contractor shall submit the following sets of calculations: a. EASE Calculations: 1) All calculations shall be completed at a minimum patch size resolution of 1.00ft at 1/3 octave, 35ms split time, and shown with Summed Interference and Map with Shadow turned on. The calculations shall be submitted electronically as EASE OpenGL (*.egl) files. The Contractor shall also provide a copy of the latest version of the EASE GLL viewer to view the electronic EASE files. 2) Provide coverage maps (print or pdf) for each main loudspeaker and combined composite of all main loudspeakers as Direct SPL at 500 Hz, 1000 Hz, 2000 Hz, 4000 Hz, 8000 Hz, and three octave mid- band sum centered at 2000 Hz. 3) Articulation Loss of Consonants (ALCons). 4) Calculated Speech Transmissible Index (STI) using the Modulation Transfer Index (MTI) with noise levels. 5) The Contractor shall use the latest version of EASE. 6) The Contractor shall refer to the architectural drawings and specifications for room geometry, room dimensions and surface finishes. 7) The Contractor shall use a listener sitting height of four (4) feet for rooms where the primary function will be sitting. The Contractor shall utilize a listener standing height of five feet three inches (5.25') for rooms where the primary function will be standing. 8) The Contractor shall use a standard indoor temperature of 68°°F, 60% humidity and a standard pressure of 29.8 Hg, unless more specific data is available. 9) The Contractor shall submit packed electronic EASE files or an EASE generated list of materials and room data for review and approval by the Architect/Engineer. F. Discontinued Products and New Model Releases: 1. For each product, the Contractor shall submit (in addition to the specified product) a product cut sheet if the specified product has been replaced, improved upon, phased out or otherwise upgraded at the time of shop drawing submittal. a. The intent of this requirement is for the Contractor to submit only direct replacements for the specified products. A direct replacement shall be defined as a product of newer release that has equal or greater capabilities, which is available for not more than a 10% premium over the specified product's bid unit cost. 1024 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 8 PROFESSIONAL AUDIO/VIDEO SYSTEM b. It is not the intent of this requirement for the Contractor to submit new products or other product options that significantly differ in capability and/or cost from the specified product. G. Coordination Drawings: 1. Include all ceiling-mounted devices in composite electronic coordination files. Refer to Section 27 05 00 for coordination drawing requirements. 2. Coordinate with owner provided Broadcast System drawings, layouts and single- line functionals. 1.6 SYSTEM DESCRIPTION A. This specification section describes the furnishing, installation, commissioning and programming of audio/video components and systems. B. Performance Statement: This specification section and the accompanying Contract Documents are performance based, describing the minimum material quality, required features, and operational requirements of the system. These documents do not convey every wire that must be installed, every equipment connection that must be made and every feature and function that must be programmed and configured. Based on the equipment constraints described and the performance required of the system, as presented in these documents, the Vendor and the Contractor are solely responsible for determining all wiring, programming and miscellaneous equipment required for a complete and operational system. C. This document describes the major components of the system. All additional hardware, subassemblies, supporting equipment and other miscellaneous equipment required for proper system installation and operation shall be provided by the Contractor. D. This document describes the major programming features and functions of the system. All additional programming, configuration and integration required for proper system installation and operation shall be provided by the Contractor. E. When a specific manufacturer is not provided in this document for minor pieces of equipment, the Contractor shall provide only those materials considered to be of the same industry commercial and professional quality level as the major equipment manufacturers. Owner shall determine if item is of comparable quality. F. General System Description: 1. The purpose of this section is to define the overall AV system requirements for each space identified on the project drawings. This is to represent the end-user needs, applications, tasks and Functions and features for each space to assist with identifying programing requirements for each space. G. Room Type Requirements: 1. Council Chamber a) System on/off 1025 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 9 PROFESSIONAL AUDIO/VIDEO SYSTEM b) Audio and/or video source and destination selection c) Audio level d) Source on/off e) Codec functions such as dialup, address book, etc. f) Speaker timer g) Voting control h) System on/off i) Audio and/or video source and destination selection j) Audio level k) Source on/off 2. Conference Room (Room 201): a. The large conference system shall provide support for videoconferences as well as presentations and meetings. This room should also be able to serve as overflow for Council Meetings. b. System Requirements: 1) Provide in-room display of video sources including local inputs, Council inputs, a Blu-ray player and video conferencing codec. 2) Provide the capability for the display of temporary video sources connected through an auxiliary input panel in the table. 3) Provide ceiling-mounted array microphones for audio input to the videoconferencing codec. 4) Provide a PTZ video camera for video input to the videoconferencing codec. 5) Provide flat panel display mounted on the front wall of the room as the primary display device. 6) Provide ceiling loudspeakers and associated electronics to reproduce the mono or summed-stereo to mono audio signal. 7) Provide a control system with touch screen control panel. 8) The control system to provide control for: a) System on/off b) Audio and/or video source and destination selection c) Audio level d) Source on/off e) Codec functions such as camera control, dialup, address book, etc. 9) Provide portable ALS system compliant with 2013 CBC 11B-219 and 11B-706, signage compliant with 2013 CBC 11B-216.10, and two (2) receivers, one of which shall be hearing aid compatible. 10) Mount equipment in owner furnished credenza with integrated equipment rack. 3. Conference Room (Room 134): a. The conference system shall provide support for presentations and meetings. This room should also be able to serve as overflow for Council Meetings. b. Systems Description: 1026 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 10 PROFESSIONAL AUDIO/VIDEO SYSTEM 1) Provide in-room display of local and Council video sources. 2) Provide the capability for the display of temporary video sources . 3) Provide panel display mounted on the front wall of the room as the primary display device. 4) Provide ceiling loudspeakers and associated electronics to reproduce the mono or summed-stereo to mono audio signal. 5) Provide a control system with touch screen control panel. 6) The control system to provide control for: a) System on/off b) Audio and/or video source and destination selection c) Audio level d) Source on/off e) Codec functions such as camera control, dialup, address book, etc. 7) Provide portable ALS system compliant with 2013 CBC 11B-219 and 11B-706, signage compliant with 2013 CBC 11B-216.10, and two (2) receivers, one of which shall be hearing aid compatible. 8) Equipment to be installed in AVR equipment rack. 4. Conference Room (Room 206) & Collaboration Lounge: a. Thesespaces shall provide support for presentations and meetings. These rooms should also be able to serve as overflow for Council Meetings. b. System Requirements: 1) Provide capability for the display of temporary video sources connected through a wall plate. 2) Provide apanel display with built-in speakers mounted on the front wall of the room as the primary display device. 3) Provide a control system with touch screen control panel. 4) The control system to provide control for: a) System on/off b) Display input selection c) Audio level d) Channel control c. Architectural and Infrastructure Requirements: 1) Provide appropriate backing for mounting the display to the wall. Coordinate with electrical backboxes. 2) Provide apanel display with built-in speakers mounted on the front wall of the room as the primary display device. 3) Provide a control system with touch screen control panel. 4) The control system to provide control for: a) System on/off b) Display input selection c) Audio level 1027 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 11 PROFESSIONAL AUDIO/VIDEO SYSTEM d) Channel control d. Architectural and Infrastructure Requirements: 1) Provide appropriate backing for mounting the display to the wall. Coordinate with electrical backboxes. 1.7 LICENSING REQUIREMENTS A. All user licenses required for system operation shall be included in the Contractor's bid. User licenses shall include, but not be limited to, server and workstation software and any other licensing that is required by the manufacturer for operation of any system component. 1. Licenses shall be provided on a one-to-one basis. One license shall be provided for each server, workstation, and device requiring a license. In the event the manufacturer requires the purchase of a block of licenses, the minimum standard licensing package to support all devices shall be provided. 1.8 INTELLECTUAL PROPERTY OWNERSHIP A. All supporting documentation, programming, uncompiled source code, graphic files, DSP code and diagrams, written and electronic files, including all latest versions of the documentation and software necessary to edit and adapt the system(s), shall be provided to the Owner for all spaces and all systems. The integrator and/or programmer shall also maintain a current copy to be provided at the Owner's request. 1. The Owner shall have the right to modify the intellectual property directly, or to have the intellectual property modified by any party of the Owner's choosing. 2. Credentials for all system software and hardware must be verified by the Owner as valid and functional before completion of project. 1.9 PROJECT RECORD DOCUMENTS A. Submit documents under the provisions of Section 27 05 00. B. Provide all applicable certifications. C. Provide statement that system checkout test, as outlined in the shop drawing submittal, is complete and satisfactory. D. Provide schedules documenting all terminal block wiring, including cable numbers. E. Warranty: Submit written warranty and complete all Owner registration forms. F. Complete all operation and maintenance manuals as described below. G. The Contractor shall include all factory-provided test results for equipment installed on the project. H. The Contractor shall include all test results from system demonstration and performance testing specified in this document. 1028 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 12 PROFESSIONAL AUDIO/VIDEO SYSTEM I. Record Drawings shall minimally include: 1. All revisions to, or deviations from the original drawings, as well as final dimensions, cable routes, connector panel drawings, cable numbering charts, and control system programming documentation. A complete as-installed equipment list, listed by room, and with manufacturers' names, model numbers, serial numbers, and quantities of each item. 2. A complete and correct system schematic, showing detailed connections for all parts of the system, including wire numbers, terminal block numbers and layouts, and other designations and programming code. 3. Complete equipment rack layouts showing locations of all rack-mounted equipment items. 4. Additional information, diagrams or explanations as designated under respective equipment or systems specification section. J. Within each equipment room, the appropriate floor plan for which that equipment room serves shall be laminated and mounted for use by the Owner. Functional drawings shall be posted at each AV closet or included at every AV rack within a room. K. Upon completion and final acceptance of the project, the Contractor shall provide the Owner a copy of the programming code for any and all AV systems and devices programmed by the Contractor. 1. For any subsequent modifications to the programming code, an updated copy of the code shall be provided to the Owner. 1.10 OPERATION AND MAINTENANCE DATA A. Submit documents under the provisions of Section 27 05 00. B. Manuals: Final copies of the manuals shall be delivered after completing the installation. Each manual's contents shall be identified on the cover. The manual shall include names, addresses, and telephone numbers of the Contractor responsible for the installation and maintenance of the system and the factory representatives for each item of equipment for each system. The manuals shall have a table of contents and labeled sections. The final copies delivered after completion of the installation shall include all modifications made during installation, checkout, and acceptance. Manuals shall be submitted in electronic format. The manuals shall consist of the following: 1. Functional Design Manual: The functional design manual shall identify the operational requirements for the system and explain the theory of operation, design philosophy, and specific functions. A description of hardware and software functions, interfaces, and requirements shall be included. 2. Hardware Manual: The manual shall describe all equipment furnished including: a. General description and specifications. b. Installation and checkout procedures. c. Equipment layout and electrical schematics to the component level. d. System layout drawings and schematics. e. Alignment and calibration procedures. f. Manufacturers repair parts list indicating sources of supply. 1029 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 13 PROFESSIONAL AUDIO/VIDEO SYSTEM 3. Software Manual: The software manual shall describe the functions of all software and shall include all other information necessary to enable proper loading, testing, and operation. The manual shall include: a. Definition of terms and functions. b. System use and application software. c. Initializations, startup, and shutdown. d. Reports generation. e. Details on forms customization and field parameters. 4. Operator's Manual: The operator's manual shall fully explain all procedures and instructions for the operation of the system including: a. Computers and peripherals. b. System startup and shutdown procedures. c. Use of system, command, and applications software. d. Recovery and restart procedures. e. Use of report generator and generation of reports. f. Data entry. g. Operator commands. h. Alarm messages and reprinting formats. i. System permissions functions and requirements. 5. Maintenance Manual: The maintenance manual shall include descriptions of maintenance for all equipment including inspection, periodic preventive maintenance, fault diagnosis, and repair or replacement of defective components. C. Intellectual Property Ownership: Provide all uncompiled source code and DSP programming for all systems and spaces as described in Part 3 of this specification section. 1.11 WARRANTY A. Unless otherwise noted, provide warranty for one (1) year after Notice of Completion for all materials and labor. B. Onsite Work During Warranty Period: This work shall be included in the Contractor's bid and performed during regular working hours, Monday through Friday. C. Operation: Upon the performance of any scheduled adjustments or repairs, Contractor shall verify operation of the systems. D. Emergency Service: The Owner will initiate service calls when the systems are not functioning properly. Qualified personnel shall be available to provide service within the distance defined within this specification section. The Owner shall be furnished with telephone number(s) where service personnel can be reached 24/7/365. Service personnel shall be at site within 24 hours after receiving a request for service. 1030 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 14 PROFESSIONAL AUDIO/VIDEO SYSTEM E. Records and Logs: The Contractor shall keep records and logs of each task completed under warranty. The log shall contain all initial settings at substantial completion. Complete logs shall be kept and shall be available for review on site, demonstrating that planned and systematic adjustments and repairs have been accomplished for the systems. F. Work Requests: The Contractor shall separately record each service call request on a service request form. The form shall include the model and serial number identifying the component involved, its location, date and time the call was received, specific nature of trouble, names of service personnel assigned to the task, instructions describing what must be done, the amount and nature of the materials used, the time and date work started, and the time and date of completion. The Contractor shall deliver a record of the work performed within five (5) business days after work is accomplished. G. System Modifications: The Contractor shall make any recommendations for system modification in writing to the Owner. No system modifications shall be made without prior approval of the Owner. Any modifications made to the system shall be incorporated into the operations and maintenance manuals, and other documentation affected. To the fullest extent possible, the Owner shall be provided with electronic restorable versions of all configurations prior to the modifications being made. H. Software: The Contractor shall provide all software and firmware updates during the period of the warranty and verify operation of the system upon installation. These updates shall be accomplished in a timely manner, fully coordinated with system operators, shall include training for the new changes/features, and shall be incorporated into the operations and maintenance manuals, and software documentation. I. Refer to the individual product sections for further warranty requirements of individual system components. PART 2 - PRODUCTS 2.1 SYSTEM COMPONENTS A. Refer to the project drawings for basis of design system components. Equivalent products shall meet or exceed all requirements defined on the project drawings. The following product information represents the minimum additional requirements for equivalent products: B. Media Players: 1. All media players, including Blu-ray players that are capable of outputting protected content including HDCP and DPCP, shall have a minimum of 16 keys available. C. Audio/Video GUI Control Systems: 1031 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 15 PROFESSIONAL AUDIO/VIDEO SYSTEM 1. Contractor shall furnish a programmable software-based audio/video control system. The system shall be field configurable and programmable by the factory and/or a factory-trained programmer. 2. The control system shall be TCP/IP based allowing direct connection of the system processors to a 10/100BaseT compatible Ethernet network. 3. Refer to project drawings for required central processors, touch panels, keypads and additional information. D. Audio Amplifiers: 1. Power Amplifier(s), 25, 70.7 and 100 Volt: a. Power: The following calculation shall be used to determine the minimum required output of the amplifier(s): 1) Calculate the total power tap value of each transformer with insertion loss using the following equation: a) Tap wattage x 10^(xdB/10) where x = the rated insertion loss at 1,000Hz. 2) Calculate the total wattage loss based on cable distance, cable gauge and cable resistance. 3) Add together all the speaker taps' total power values that will be on a single channel of the amplifier. Multiply that total by 1.2, which will allow for a 20% future expansion. Multiply that number by 1.25 to ensure the amplifier never exceeds 75% of its total output. Utilize the final number to determine the minimum amplifier power requirements. E. Assisted Listening Systems (ALS): 1. Assisted listening requirements for this project shall follow the local jurisdiction's requirements to quantify the number of devices for use on this project. 2. All spaces with amplified audible communications require an ALS. The Contractor shall refer to the ADA and ADAAG guidelines, as well as CBC Section 1108.2.7 for ALS rules, regulations and guidelines. Refer to the table below for the required number of receivers to be provided for each space (Source: IBC, Table 1108.2.7.1). Alternatively, if the building is managed by a single entity and all systems are fully compatible and interoperable, the total number of seats for all areas can be used in accordance with the table below. Capacity of Seating in Assemble Areas Minimum Required Number of Receivers Minimum Number of Receivers to be Hearing-aid (T-coil) Compatible 50 or less 2 2 51 to 200 2, plus 1 per 25 seats over 50 seats 2 201 to 500 2, plus 1 per 25 seats over 50 seats 1 per 4 receivers 501 to 1,000 20, plus 1 per 33 seats over 500 seats 1 per 4 receivers 1032 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 16 PROFESSIONAL AUDIO/VIDEO SYSTEM Capacity of Seating in Assemble Areas Minimum Required Number of Receivers Minimum Number of Receivers to be Hearing-aid (T-coil) Compatible 1,101 to 2,000 35, plus 1 per 50 seats over 1,000 seats 1 per 4 receivers Over 2,000 55, plus 1 per 100 seats over 2,000 seats 1 per 4 receivers 3. Receivers required to be hearing-aid compatible shall interface with telecoils in hearing aids through the provision of neckloops and shall be over-the-ear type headphones. Earbuds are not acceptable for this use. 4. Receivers shall include a 1/8" (3.2mm) standard mono output jack. 5. Refer to the Access Board Research "Large Area Assistive Listening Systems: Review and Recommendations" ALS report for additional recommendations. F. Power Conditioning and Surge Protective Devices: 1. All equipment shall be plugged in through a power conditioning surge arrestor. 2. Provide a minimum of 50 dB noise attenuation. 3. Provide a minimum of 1,500 joules of surge protection. 4. UL 1449 “Standard for Safety for Surge Protective Devices listed to 330 volt clamping voltage. 5. Provide automatic voltage regulation from 97 VAC to 137 VAC at a minimum to maintain a stable 120 VAC where specified. 6. Power sequencers shall be equipped with contact closures bi-directional RS-232 or Ethernet control for remote turn on and off. 7. Refer to the project drawings for additional information. G. Digital Video Signal Equalizers and Regenerators: 1. For any cable run that exceeds the manufacturer-recommended distances or fails to transmit video or audio due to cable length, the Contractor shall provide and install a signal equalizer at the far end (sink) with the following minimum features: a. HDMI/DVI equalizers shall be HDCP compliant and support actively buffered DDC transmission. b. Display port equalizers shall be HDCP and DPCP compliant, support actively buffered DDC transmission, and be DP++ compatible. c. Provide automatic equalization. d. Pass all embedded audio and metadata. e. Have an auxiliary power input when adequate power is not available on the cable. f. Provide output reclocking and jitter reduction for multi-rate SDI signals. 2. For any cable run that that fails to transmit video or audio due to a weak source signal, the Contractor shall provide and install a signal regenerator at the near end (source) with the following minimum features: a. HDMI/DVI regenerators shall be HDCP compliant and support actively buffered DDC. 1033 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 17 PROFESSIONAL AUDIO/VIDEO SYSTEM b. Display port regenerators shall be HDCP and DPCP compliant, support DDC transmission, and be DP++ compatible. c. Provide automatic output reclocking and jitter reduction. d. Pass all embedded audio and metadata. e. Have an auxiliary power input when adequate power is not available on the cable. H. Extended Display Identification Data (EDID) Emulators: 1. If any source or Owner-furnished equipment (OFE) is not outputting video properly, the Contractor shall provide and install an EDID Emulator and set it to the highest common EDID table of the displays (sinks) being outputted to, with the following minimum features: a. EDID capture mode from a display. b. Have an auxiliary power input when adequate power is not available on the cable. I. Audio Unbalanced to Balanced Converters, Balanced to Unbalanced Converters, Combiners, Dividers, Isolation Transformers, and Line Drivers Minimum Requirements: 1. Unbalanced to Balanced Active Converter: a. Provide signal isolation from the audio signals of differing channels. b. Provide output trim gain and set to optimal output level while preventing over amplification and clipping of the signal. c. Minimum frequency response of 20 Hz to 20 kHz (±± 0.5dB). d. Provide with appropriate power supply and mounting kit for rack or wall use. e. Provide appropriate converter for mono to mono, mono to stereo, stereo to stereo, or stereo to mono to match the input of the equipment to which it is being connected. 2. Balanced to Unbalanced Passive Converter: a. Provide transformer isolation from the input to output. b. Provide output trim attenuation and set to optimal output level while preventing over-amplification and clipping of the signal. c. Minimum frequency response of 20 Hz to 20 kHz (±± 0.5dB). d. Provide with appropriate mounting kit for rack or wall use. e. Provide appropriate converter for mono to mono, mono to stereo, stereo to stereo, or stereo to mono to match the input of the equipment to which it is being connected. 3. Stereo to Mono and Mono to Stereo Passive Combiner/Divider: a. Passive resistive network. b. Provide RF filtering. c. Provide a minimum of 3dB of isolation between channels. d. Provide no greater than 3dB of Insertion Loss. e. Minimum frequency response of 20 Hz to 20 kHz (±± 3dB). f. Provide with appropriate mounting kit for rack or wall use. 1034 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 18 PROFESSIONAL AUDIO/VIDEO SYSTEM g. Provide appropriate passive combiner for low impedance or high impedance and balanced or unbalanced signals to maintain the original signal type. 4. Passive Isolation Transformer: a. Provide Galvanic Isolation. b. Minimum frequency response of 20 Hz to 20 kHz (±± 3dB). c. Isolate the input shield from the output shield. Input shield is electrically isolated from the transformer chassis and provides a ground return. The output shield is connected to the transformer chassis. d. Provide with appropriate mounting kit for rack or wall use. e. Provide appropriate isolation transformer for low impedance or high impedance, stereo or mono signals, and balanced or unbalanced signals to maintain the original signal type. 5. Active Signal Line Driver: a. Provide balanced or unbalanced inputs with balanced outputs. b. Provide input trim gain for a minimum of unity gain from -14dBu to +24dBu, set to optimal output level while preventing over-amplification and clipping of the signal. c. Provide a minimum balanced output of +4dBu nominal for a minimum output gain of +25dBu. d. Minimum frequency response of 20 Hz to 20 kHz (±± 0.5dB). e. Provide with appropriate power supply and mounting kit for rack or wall use. f. Provide appropriate line driver for low impedance or high impedance and stereo or mono signals. J. Refer to project drawings for all other equipment not listed. 2.2 AUDIO CONNECTORS A. This article includes minimum requirements for all connectors that are acceptable on this project. Should the Contractor request an alternative connector, it shall be submitted with the product submittals and clearly identified with which connector it will be replaced. B. XLR Plug: 1. Professional grade, 360°° strain relief, nickel shell, silver pins. Provide colored boot. 2. Manufacturers: a. Switchcraft b. Neutrik C. Loudspeaker Connector: 1. Panel Mount: Twist-lock type, 4-conductor. 2. Manufacturers: 1035 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 19 PROFESSIONAL AUDIO/VIDEO SYSTEM a. Neutrik b. Speakon 2.3 AUDIO CABLING A. Refer to Section 27 05 00 for cable rating requirements. B. Microphone Level Audio Cabling: 1. For patch cables less than or equal to 25 feet: a. 24 AWG 2-conductor, twisted, stranded (19x36) tinned bare copper. b. Single Layer Shield: 1) Shield: 100% aluminum foil shield c. Nominal Capacitance: 30.0 pF/Ft 1) Belden 2) West Penn 3) Liberty 2. For cable runs greater than or equal to 25 feet: a. 22 AWG 2-conductor, twisted, stranded (16x34) tinned bare copper. b. Dual Layer Shield: 1) Shield: 85% total tinned copper braid shield c. Nominal Capacitance: 18.0 pF/Ft d. Manufacturers: 1) Belden 2) West Penn 3) Liberty C. Line Level Audio Cabling: 1. For patch cables less than or equal to 25 feet: a. 22 AWG 2-conductor, twisted, stranded (7x30) tinned bare copper. b. Single Layer Shield: 1) Shield: 100% aluminum foil shield c. Nominal Capacitance for non-plenum cable: 24.0pF/Ft d. Nominal Capacitance for plenum cable: 35.0 pF/Ft e. Manufacturers: 1) Belden 2) West Penn 3) Liberty 1036 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 20 PROFESSIONAL AUDIO/VIDEO SYSTEM 2. For cable runs greater than or equal to 25 feet: a. 18 AWG 2-conductor, twisted, stranded (16x30) tinned bare copper. b. Single Layer Shield: 1) Shield: 100% aluminum foil shield c. Manufacturers: 1) Belden 2) West Penn 3) Liberty D. AES/EBU Digital Audio Cabling: 1. For patch cables less than or equal to 25 feet: a. 24 AWG 2-conductor, twisted, stranded (7x32) tinned bare copper. b. Single Layer Shield: 1) Outer Shield: 100% aluminum foil shield c. Nominal Impedance: 110 ohms d. Nominal Capacitance: 12.0 pF/Ft e. Velocity of Propagation for non-plenum cable: 76% f. Velocity of Propagation for plenum cable: 78%. g. Maximum Attenuation (per 100 feet): 1) at 2-MHz: 1.3 dB 2) at 4-MHz: 1.56 dB 3) at 5-MHz: 1.7 dB 4) at 6-MHz: 1.81 dB 5) at 12-MHz: 2.28 dB 6) at 24-MHz: 3.08 dB h. Manufacturers: 1) Belden 2) West Penn 3) Liberty 2. For cable runs greater than or equal to 25 feet: a. 22 AWG 2-conductor, twisted, stranded (7x30) tinned bare copper. b. Dual Layer Shield: 1) Inner shield: 100% aluminum foil shield 2) Outer shield: 90% tinned copper braid shield c. Nominal Impedance: 110 ohms d. Nominal Capacitance: 13.0 pF/Ft e. Velocity of Propagation: 76% 1037 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 21 PROFESSIONAL AUDIO/VIDEO SYSTEM f. Maximum Attenuation (per 100 feet): 1) at 2-MHz: .93 dB 2) at 4-MHz: 1.15 dB 3) at 5-MHz: 1.2 dB 4) at 6-MHz: 1.3 dB 5) at 12-MHz: 1.6 dB 6) at 24-MHz: 1.97 dB g. Manufacturers: 1) Belden 1696A 2) West Penn 3) Liberty E. Constant Voltage Speaker Cabling: 1. Class 2, stranded, twisted, 2-conductor, minimum of 16-gauge wire for all 25/70.7/100-volt applications unless noted otherwise. 2. The Contractor shall size cabling as required for distance power and shall provide larger gauge cable as required. 3. Manufacturers: a. Belden b. Liberty c. Or pre-approved equal F. High Performance Low Capacitance Speaker/Subwoofer Cabling: 1. Class 2, high strand count (259x34), oxygen free copper, low capacitance (23.2 pF/Ft), twisted, 2-conductor, 10-gauge wire for all 4/8-ohm low impedance applications where amplifier output is 150 watts or greater and/or the distance is greater than 50', unless noted otherwise. 2. The Contractor shall size cabling as required for distance power and shall provide larger gauge cable as required. 3. Cable shall be installed in conduit within plenum areas. 4. Manufacturers: a. Belden b. Liberty c. Or pre-approved equal 2.4 ANALOG VIDEO CONNECTORS A. BNC Connector: 1. 75 ohm, broadcast quality, two-piece compression type. Return Loss: Less than - 36 dB to 1 GHz, -25 dB to 2 GHz, -23 dB to 3 GHz. Twist-on and crimp connectors are not acceptable. 2. Manufacturers: a. Corning Gilbert 1038 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 22 PROFESSIONAL AUDIO/VIDEO SYSTEM b. King c. Amphenol 2.5 ANALOG VIDEO CABLING A. RF Video Cable: 1. For cable runs less than or equal to 100 feet: a. RG-6, center conductor: 18 AWG bare copper covered steel; 0.040" OD (nominal). b. Four Layer Shield: 1) Inner shield: 100% aluminum-polypropylene-aluminum laminated tape with overlap bonded to dielectric. 2) Second shield: 60% 34 AWG bare aluminum braid wire. 3) Third shield: 100% non-bonded aluminum foil tape. 4) Outer shield: 40% 34 AWG bare aluminum braid wire. c. Nominal Impedance: 75 ohms d. Nominal Capacitance: 16.2 pF/Ft e. Velocity of Propagation: 83% f. Maximum attenuation for non-plenum cable (per 100 feet): 1) at 5-MHz: 0.67 dB 2) at 55-MHz: 1.60 dB 3) at 400-MHz: 4.00 dB 4) at 700-MHz: 5.45 dB 5) at 1000-MHz: 6.54 dB g. Manufacturers: 1) Belden 2) CommScope 3) Liberty 4) Times Fiber 5) Or pre-approved equal 2. For cable runs greater than or equal to 100 feet: a. For any cable run that exceeds the manufacturer-recommended distances, the Contractor shall provide and install an RF booster amplifier and set the gain and slope to achieve the proper signal level. b. RG-11, center conductor: 14 AWG bare copper covered steel; 0.064" OD (nominal). c. Four Layer Shield: 1) Inner shield: 100% aluminum-polypropylene-aluminum laminated tape with overlap bonded to dielectric. 2) Second shield: 60% 34 AWG bare aluminum braid wire. 3) Third shield: 100% non-bonded aluminum foil tape. 4) Outer shield: 40% 34 AWG bare aluminum braid wire. 1039 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 23 PROFESSIONAL AUDIO/VIDEO SYSTEM d. Nominal Impedance: 75 ohms e. Nominal Capacitance: 16.2 pF/Ft f. Velocity of Propagation for non-plenum cable: 83% g. Maximum attenuation for non-plenum cable (per 100 feet): 1) at 5-MHz: 0.38 dB 2) at 55-MHz: 0.97 dB 3) at 400-MHz: 2.47 dB 4) at 700-MHz: 3.37 dB 5) at 1000-MHz: 4.23 dB h. Manufacturers: 1) Belden 2) CommScope 3) Liberty 4) Times Fiber 5) Or pre-approved equal 2.6 DIGITAL VIDEO CABLING A. All digital video cabling shall be pre-assembled and tested in a factory and not field terminated. The contractor shall field verify the cable distance and provide the proper cable type and length. B. High Definition Multi-Media Interface (HDMI) "High Speed" Cable: 1. For any cable run that exceeds the manufacturer-recommended distances or fails to transmit video or audio due to cable length, the Contractor shall provide and install am HDCP-compliant signal equalizer at the far end. 2. For cable runs less than or equal to 25 feet: a. Four (4) 28AWG solid bonded twisted pairs for clock and data, and seven (7) 28AWG solid conductors for control. b. Two Layer Shield: 1) Inner shield: non-bonded aluminum foil tape. 2) Outer shield: 85% tinned copper braid shield. c. Nominal attenuation of clock and data pairs (per 100 feet): 1) at 100-MHz: 9.6 dB 2) at 400-MHz: 19.3 dB 3) at 825-MHz: 28.9 dB 4) at 1200-MHz: 36.1 dB d. Nominal capacitance between shielded pairs: 15.3 pF/ft nominal. e. Nominal capacitance between control pairs: 16.5 pF/ft nominal. f. Nominal return loss of shielded pairs: 15 dB, 1-1200 MHZ. g. Nominal shield DC resistance of individual shield: 24.4 ohms/1000 ft. h. Nominal shield DC resistance of overall shield: 3.7 ohms/1000 ft. 1040 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 24 PROFESSIONAL AUDIO/VIDEO SYSTEM i. The cable shall be HDMI 1.3a Category 1 certified to 25 feet, and HDMI 1.3a Category 2 certified to 15 feet. j. Supports a maximum digital data rate of 10.2 Gbit/s. k. Supports up to eight (8) channels of HD audio. l. HDCP compliant. m. Manufacturers: 1) Belden 2) Or pre-approved equal 3. For cable runs greater than 25 feet: a. Four (4) 24AWG solid bonded twisted pairs for clock and data, and seven (7) 24AWG solid conductors for control. b. Two Layer Shield: 1) Inner shield: non-bonded aluminum foil tape. 2) Outer shield: 82% tinned copper braid shield. c. Nominal attenuation of clock and data pairs (per 100 feet): 1) at 100-MHz: 6.0 dB 2) at 400-MHz: 13.5 dB 3) at 825-MHz: 19.8 dB 4) at 1200-MHz: 24.1 dB d. Nominal capacitance between shielded pairs: 15.3 pF/ft nominal. e. Nominal capacitance between control pairs: 16.5 pF/ft nominal. f. Nominal return loss of shielded pairs: 15 dB, 1-1200 MHZ. g. Nominal shield DC resistance of individual shield: 15.0 ohms/1000 ft. h. Nominal shield DC resistance of overall shield: 1.75 ohms/1000 ft. i. The cable shall be HDMI 1.3a Category 1 certified to 45 feet, and HDMI 1.3a Category 2 certified to 25 feet. j. Supports a maximum digital data rate of 10.2 Gbit/s. k. Supports up to eight (8) channels of HD audio. l. HDCP compliant. m. Manufacturers: 1) Belden 2) Or pre-approved equal C. High Definition Serial Digital Interface (HD-SDI) Cabling: 1. For patch cables less than or equal to 25 feet: a. RG-59, center conductor: 22 AWG stranded (7x29) bare copper, 0.023" OD (nominal), polyethylene dielectric. b. Single Layer Shield: 1) Outer Shield: 98% tinned copper braid c. Nominal Impedance: 75 ohms 1041 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 25 PROFESSIONAL AUDIO/VIDEO SYSTEM d. Nominal Capacitance: 21.0 pF/Ft e. Velocity of Propagation: 66% f. Maximum Attenuation (per 100 feet): 1) at 1-MHz: 0.3 dB 2) at 71.5-MHz: 2.5 dB 3) at 360-MHz: 6.0 dB 4) at 750-MHz: 8.9 dB 5) at 1000-MHz: 10.5 dB g. Manufacturers: 1) Belden 2) CommScope 3) Liberty 4) Extron 2. For horizontal cable runs less than or equal to 100 feet: a. RG-59, center conductor: 20 AWG solid bare copper, 0.031" OD (nominal), FEP insulation. b. Double Layer Shield: 1) Outer Shield: 95% tinned copper braid outside and bonded foil inside. c. Nominal Impedance: 75 ohms d. Nominal Capacitance: 16.1 pF/Ft e. Velocity of Propagation: 83% f. Maximum insertion loss (per 100 feet): 1) at 1-MHz: 0.3 dB 2) at 71.5-MHz: 2.1 dB 3) at 360-MHz: 4.4 dB 4) at 750-MHz: 6.5 dB 5) at 1000-MHz: 7.6 dB g. Manufacturers: 1) Belden non-plenum or plenum 2) CommScope 3) Liberty 4) Extron 3. For horizontal cable runs greater than or equal to 100 feet: a. For any cable run that exceeds the manufacturer-recommended distances or fails to transmit video or audio due to cable length, the Contractor shall provide and install a signal equalizer at the far end (sink). b. RG-6, center conductor: 18 AWG solid bare copper, 0.274" OD (nominal),. c. Double Layer Shield: 1042 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 26 PROFESSIONAL AUDIO/VIDEO SYSTEM 1) Inner Shield: 100% non-bonded aluminum foil tape 2) Outer Shield: 95% tinned copper braid d. Nominal Impedance: 75 ohms e. Nominal Capacitance: 15.9 pF/Ft f. Velocity of Propagation: 84.5% g. Maximum attenuation for non-plenum cable (per 100 feet): 1) at 1-MHz: 0.2 dB 2) at 71.5-MHz: 1.6 dB 3) at 360-MHz: 3.5 dB 4) at 750-MHz: 5.1 dB 5) at 1000-MHz: 5.9 dB h. Manufacturers: 1) Belden 2) CommScope 3) Liberty 4) Extron 2.7 CONTROL CABLING A. Control: 1. For Bidding Purposes: Two-pair, twisted, shielded, one (1) #18 AWG pair and one (1) #22 AWG pair. Provide with plenum-rated jacket where used in a plenum space without conduit. 2. Size conductors as required for distance and voltage drop. 3. Coordinate exact requirements with selected manufacturer and system prior to submitting bid. B. Other Control Circuits: 1. #20 AWG, stranded, shielded cable, number of conductors as required for the applications. Provide with plenum-rated jacket where used in a plenum space without conduit. Provide PVC jacket where installed in conduit or non-plenum areas. 2. Coordinate exact requirements with selected manufacturers prior to submitting bid. 2.8 HORIZONTAL COPPER DATA AND FIBER CABLING AND CONNECTORS A. Refer to Section 27 15 00 - Horizontal Cabling Requirements, for telecommunications cabling and connector requirements including fiber optics being utilized for A/V systems. B. Refer to Section 27 17 10 - Testing, for telecommunications cabling testing requirements including fiber optics being utilized for A/V systems. 1043 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 27 PROFESSIONAL AUDIO/VIDEO SYSTEM C. All category-rated copper data cabling and fiber optic cabling shall be installed, terminated, tested and certified by the Division 27 Telecommunications contractor certified by the selected manufacturers for the copper and fiber optic cabling plant. The Contractor shall submit all cabling and certifications to the Architect/Engineer for approval in the shop drawings. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that surfaces are ready to receive work. B. Verify field dimensions and coordinate physical size of all equipment with the architectural requirements of the spaces into which they are to be installed. Allow space for adequate ventilation and circulation of air. C. Verify that required utilities are available, in proper location, and ready for use. D. Beginning of installation means installer accepts existing conditions. 3.2 INSTALLATION A. Comply with the manufacturer's instructions and recommendations for installation of all products. B. Provide all system wiring between all components as directed by the manufacturer or required for proper system operation. C. Mount all touch screen and keypad devices where shown on plans in accordance with Americans with Disabilities Act (ADA) requirements for both side reach and front reach. D. Cabling Requirements: 1. Non-plenum rated cabling may be used instead of plenum when installed with-in conduit in plenum rated areas. 2. All cabling shall be routed according to function. Cabling shall be grouped and bundled by groups, such as: microphone and line level audio, control, video and speaker. In no case shall cabling from different functional groups be intermixed. No cabling shall be routed parallel to 120 VAC or higher power circuits unless separated by a minimum of 6" and the 120 VAC or higher power is installed in conduit. 3. When cabling is installed in conduit, a separate conduit shall be provided for each cabling functional type. 4. Cable bundles shall be loosely bundled to allow the visual following of individual cables within the bundle and to permit the easy removal and addition of cables as necessary. 5. Horizontal cabling installed as open cable or in cable tray shall be bundled at not less than 10' intervals with hook-and-loop tie wraps. The use of plastic cable zip ties is strictly prohibited in any situation. 6. Cabling shall not be spliced under any circumstances. 1044 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 28 PROFESSIONAL AUDIO/VIDEO SYSTEM 7. Each cable shall be appropriately identified (as defined on the record documents) at each end's termination point using pressure sensitive label strips. 8. Audio Cabling: a. All amplified audio cabling shall not be in the same enclosed pathway as any other type of cabling as required by the NEC. Refer to the NEC for definitions and additional requirements. b. The polarity of all cabling shall remain consistent throughout the project, on all equipment. Red conductors shall be used for the positive "+" side, and black used for the negative "-" side. c. Cable shield length shall be equal to the cable's conductor length. d. All shielded cables drain wire SHALL be grounded and continuous throughout the entire length of the system, including splices where speakers are installed. e. Balanced audio connections shall be used whenever the mating equipment allows. f. Do not run unbalanced cables longer than 3m. For interconnecting of unbalanced equipment in lengths longer than 3m, the Contractor shall provide a line driver located at the source. 9. Video Cabling: a. All video cabling, unless otherwise noted, shall be provided with BNC connectors of the two-piece compression type. Twist-on BNC connectors are not permitted. b. Provide BNC 75-ohm terminators where required for all open BNC connectors. c. All coaxial video cables used for S-video, component/RGB and RGBHV shall be the same length to minimize skew. 10. Twisted Pair Cabling for All Applications: a. The Contractor shall ensure that the twists in each cable pair are preserved to within 0.5 inch of the termination. The cable jacket shall be removed only to the extent required to make the termination. b. The Contractor shall ensure that the cable shields are continuous throughout, terminated, and grounded according to the manufacturer's recommendations. E. Grounding Requirements: 1. Provide a minimum of #6 AWG conductor from the nearest electrical service ground bus or nearest telecommunications room ground bus bar to the A/V equipment racks and cabinets regardless of location. Size cable as required by the NEC. 2. Cables containing shields shall not have the shields grounded at conduits, boxes, racks, etc. Ground the shield only at the equipment end. 3. Audio cable shields for line-level signals shall be connected to the metal equipment chassis at both ends of the cable. 4. Audio cables connected to transformers shall have the cable shield connected to the transformer shield and transformer case ground. 5. The Contractor shall not connect cable shields together from differing cables. 1045 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 29 PROFESSIONAL AUDIO/VIDEO SYSTEM 6. XLR cable shields shall be connected to chassis ground. 7. Signal-grounded balanced shields are not acceptable and shall not be installed. All balanced shields shall be chassis grounded. F. Rack and Cabinet Requirements: 1. Ground equipment racks/cabinets as noted within this specification section and Section 27 05 26 - Communications Grounding. 2. Provide one (1) RU of space between adjacent pieces of equipment with top and/or bottom vents, above the topmost piece of equipment, and below the bottommost piece of equipment. Provide a vented cover panel covering each rack space. 3. Terminate all speaker cabling on individual barrier strips for positive "+", negative "-", and shield. The shield barrier strip shall be grounded. 4. Provide a power conditioning surge arrestor in the rack for distribution of AC power from the wall receptacles indicated on the plans. The quantity of plugs shall be adequate so that no equipment in the rack shall require plugging into an AC source outside the rack. 5. Power sequencing shall be provided in the racks where shown on the drawings. All amplifiers located in the racks shall be sequenced "last on – first off". Power sequencers shall provide power conditioning and surge protection. G. Video System Installation Requirements: 1. The Contractor shall confirm calculations for the optimal distance from the screen to the projector lens based on actual field conditions and submit to the Architect/Engineer for review and approval. 2. If the projector and screen are in a fixed position, the Contractor shall provide the appropriate lens for the throw distance. 3. Video display image shall fill screen area with native aspect ratio H. Audio System Installation Requirements: 1. The Contractor shall perform calculations for the optimal speaker tap settings to reach the desired SPL level and coverage without overloading the amplifier(s). a. At a minimum, the following calculations shall be used: 1) Add together all speaker taps that will be on a single channel of the amplifier. Multiply that total by 1.2, which will allow for a 20% future expansion. Multiply that number by 1.25 to ensure the amplifier never exceeds 75% of its total output. Utilize the final number to determine the minimum amplifier power requirements. 2) For direct coupled systems (low impedance), allow a minimum of 10 dB headroom before any distortion occurs at the amplifier input indicator when beginning gain stage tests are set up. Increase headroom as appropriate for high impact and clarity needs, typically exceeding 12 to 15 dB during continuous operation. 2. Connections of balanced to unbalanced equipment shall only be done through an active converter at the unbalanced side. 1046 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 30 PROFESSIONAL AUDIO/VIDEO SYSTEM 3. Connections of unbalanced to balanced equipment shall only be done through an active converter at the unbalanced side. 4. Connections from stereo balanced or unbalanced equipment to mono equipment of the same signal type shall only be done through a passive combiner. 5. Connections from mono balanced or unbalanced equipment to stereo equipment of the same signal type shall only be done through a passive divider. 6. The Contractor shall provide an isolation transformer for any balanced or unbalanced audio line that exhibits a hum, noise from EMI or RFI, power line noise, or ground loops. 7. The Contractor shall provide an active audio line driver for all balanced and unbalanced signals that exceed the distance limitations of the cabling. I. Control System Installation Requirements: 1. The Contractor shall perform calculations for the required wire AWG size based on distance for system power for touch panels, keypads and other devices being powered. A minimum of a 15% overhead is required. 3.3 VIDEO SYSTEM TESTING AND CALIBRATION A. All video equipment shall receive proper testing and configuration. B. Color Space Optimization: 1. The Contractor shall set the color space of each source and display device to a uniform color space to optimize the switching speed and compatibility of a digital video system. Each device shall be set to an RGB or YCbCr color space depending on the systems primary function and compatibility of the devices. 2. If the primary function of the space is video and other digital media, the color space of each device shall be set to a YCbCr color space. If the primary function of the space is computer-based graphics and presentations, the color space of each device shall be set to an RGB color space. 3. Chroma subsampling shall be set to a consistent 4:4:4 or 4:2:2 across all devices. Set to 4:4:4 when all equipment is capable. 4. If all devices are not capable of displaying a certain color space, all devices shall be set to a common shared color space. C. Extended Display Identification Data (EDID) Management: 1. The Contractor shall set the EDID management tables in capable equipment so all sources output the highest common EDID table of the displays (sinks). 2. For systems with capable matrix switches, the matrix shall dynamically adjust its EDID tables so any source will output the highest common EDID table of the displays (sinks) being outputted to. 3. If any source or Owner-furnished equipment (OFE) is not outputting properly, the Contractor shall provide and install an EDID Emulator and set it to the highest common EDID table of the displays (sinks) being outputted to. D. Projectors, monitors and receivers shall be tested and adjusted for proper signal sync, convergence, brightness, contrast, and color level. The Contractor shall adjust all other parameters necessary to achieve a proper video image. 1047 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 31 PROFESSIONAL AUDIO/VIDEO SYSTEM E. All video source selections shall be tested and verified. F. All projectors and displays shall have a minimum burn-in time of 96 hours prior to any adjustments are made and the completion of the project G. All projectors and displays shall have their hue/tint and color/saturation calibrated with a video signal test generator and blue lens filter after a minimum warmup time of 20 minutes. Provide all calibrated settings results for each projector and display in the final documentation. H. All projectors and displays shall have their brightness, contrast and sharpness calibrated with a video signal test generator after a minimum warmup time of 20 minutes. Provide all calibrated settings results for each projector and display in the final documentation. I. All dynamic contrast functions shall be turned off. 3.4 AUDIO SYSTEM TESTING AND CALIBRATION: A. This Contractor shall field adjust any surface-mounted or flown loudspeaker orientation to achieve the necessary coverage pattern to the intended listening plane. Loudspeakers always face listeners and minimize coverage on walls. The contractor shall be familiar with the named and specified nominal coverage angle of all speakers above its crossover point or for speech range, (500-4,000 Hz). B. All speakers shall be tested for polarity prior to high work and a table of test results shall be included for A/E inspection. All loudspeakers shall be connected with uniform polarity, where a positive pressure pulse at the input corresponds to a positive driver excursion, and all drivers are uniform always moving in the same direction. Main speakers shall not be lifted or hoisted into high access areas without polarity testing. C. The Contractor shall make incremental adjustments on the equipment output and input tolerances to achieve matching signal levels while preserving +10 dB minimum headroom and also unity gain. Insert all broadband or high pass filters first for system protection after review of manufacturers specifications for power and bandpass. D. Provide high quality media with full bandpass program material for critical listening. MP3 or streaming audio is not acceptable. Testing shall illustrate WAV file quality playback for impact and clarity. E. The Contractor shall provide graphic plots of the reference ambient noise for each space at the time of the calibration and submit with the calibration results. Test signal shall be 10dB minimum above ambient noise levels during testing. F. The Contractor shall use a listener sitting height of four (4) feet ± 1" for rooms where the primary function will be sitting. The Contractor shall use a listener standing height of five feet three inches (5.25') ± 1" for rooms where the primary function will be standing 1048 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 32 PROFESSIONAL AUDIO/VIDEO SYSTEM 3.5 ASSISTED LISTENING SYSTEM (ALS) PERFORMANCE REQUIREMENTS A. The Contractor shall verify that the ALS system(s) meets the following minimum performance requirements at the earphone or headset: 1. Reach a minimum total SPL of 75 dBA and no greater than 95 dBA, with a minimum of a 50dB dynamic range volume control. 2. Achieve a minimum signal-to-noise (S/N) ratio of 18dB. It is recommended to achieve a minimum signal-to-noise (S/N) ratio of 25dB to accommodate children. 3. Ensure the peak clipping levels do not exceed 18dB down from the peak input signal level. B. FM-based systems shall operate within the FCC-reserved assisted listening frequencies of 72 to 76 MHz or the 216 to 217 MHz (preferred) range and comply with the FCC transmitter power requirements. C. Infrared (IR)-based systems shall provide IR coverage throughout the entire listening area. 1. The IR system's RF sub-carrier frequency shall operate at 95kHz, 250kHz, or 2.3MHz. 3.6 DSP-BASED AUDIO PROCESSOR PROGRAMMING A. Full system programming shall be provided for the system. Programming shall be performed by a factory trained and certified programmer or an employee of the equipment manufacturer. B. DSP pathfile with initial settings shall be provided by the Contractor for review by the Architect/Engineer before installation. C. The IP-based audio (IEEE AVB, Dante, etc.) and components shall be on a dedicated Virtual LAN (VLAN) for the A/V systems. These components shall be on a dedicated subnetwork of the VLAN. The Contractor shall coordinate these requirements with the Owner prior to installation. D. A parametric EQ shall be provided after each crossover point or as approved in the DSP pathfile during shop submittal review. These equalizers should not be made available to the user to adjust. E. Levelers, compressor/limiters, duckers, gates and delays shall be preset during testing and commissioning and are not available for user adjustment following commissioning. F. Provide each microphone input with high-pass filter, 5-band parametric EQ, auto- leveler and volume module. Provide line level inputs with high-pass filter, 3-band parametric EQ, compressor/limiter, and volume module. G. Acoustic Echo Cancelation (AEC) shall be provided for each conference microphone input. -- 1049 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 33 PROFESSIONAL AUDIO/VIDEO SYSTEM H. A broadband pink noise generator shall be provided with a selectable on/off control button within the DSP pathfile. The noise shall be routable through all processing EQs and speaker outputs during testing. I. Provide volume meters with labeling for each input and each output. J. The Contractor shall utilize the latest version of the programming software. K. The Contractor shall ensure that all components are updated to the latest firmware at the completion of the project. 3.7 MULTIMEDIA CONTROL SYSTEM INTEGRATION AND PROGRAMMING A. Programming and Integration for Control Systems: 1. Full system programming shall be provided for the system. Programming shall be performed by a factory trained and certified programmer or an employee of the equipment manufacturer. 2. The Contractor shall schedule a series of meetings with the Owner and Architect/Engineer to define and determine the exact integration requirements of the control system prior to the installation of the control system and components. An Owner sign-off of the final configuration shall be required. 3. This section only defines the minimum requirements. The programmer shall provide complete programming for a fully functional system. 4. The Contractor shall utilize the latest version of the programming software. 5. The Contractor shall ensure that all components are updated to the latest firmware at the completion of the project. 6. The IP-based control system and controlled components shall be on a dedicated Virtual LAN (VLAN) for the A/V systems. These components shall be on a dedicated subnetwork of the VLAN. The Contractor shall coordinate these requirements with the Owner prior to installation. 7. Integration and programming of the following pieces of equipment shall be provided, with the following minimum features and functions: a. All equipment shall include on/off control, except for equipment that must remain active for system functionality. b. Integration of HDCP (High-bandwidth Digital Content Protection) and DPCP (Display Port Content Protection) protected content and sources: 1) No protected sources or content shall be allowed to be selected to route through non-protected devices and displays. A warning shall be displayed stating this information to the user. c. Matrix Switcher Integration: 1) The Contractor shall provide bi-directional RS-232 or Ethernet control system connections and programming with the following minimum functions: a) On/off control of the matrix switcher. b) Allow for independent video routing of individual video inputs to any audio number of audio outputs. 1050 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 34 PROFESSIONAL AUDIO/VIDEO SYSTEM c) Allow for audio follow video switcher mode. d) Provide source detection of video inputs. e) HDCP (High-bandwidth Digital Content Protection) and DPCP (Display Port Content Protection) Protection: f) For HDCP/DPCP - compliant sources; switcher shall only allow for routing of signals to HDCP compliant devices. g) For HDCP/DPCP - complaint switchers; room combining/uncombining features shall allow for complete audio and /or video devices to be connected to the system using a simplified interface. d. DSP Audio Processor Integration: 1) The Contractor shall provide bi-directional RS-232 or Ethernet control system connections and programming with the following minimum functions: a) On/off control of all microphones. b) Volume and mute control of all microphones and input sources. c) Volume and mute control of all outputs. d) Independent volume and mute control of all assisted listening outputs. e) On/off and reset control of feedback eliminators and suppressors. f) Advanced routing of audio signals. g) Audio conferencing dialer keypad with speed dials. h) Audio conferencing CallerID display on touchpanel and/or workstation. i) Acoustic Echo Cancelation (AEC) control. e. Audio Conference Integration: 1) Refer to DSP Audio Processor Integration for requirements. f. Display Integration: 1) The displays shall be integrated into the A/V control system via bi- directional RS-232 or Ethernet control. Provide with the following minimum functions: a) On/off control. b) Display status feedback. c) Source switching control. d) Audio volume control with mute. e) Video mute. f) Tuner channel control with direct channel access. g) Station presets with station icons. g. Video Conference/Telepresence Integration: 1051 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 35 PROFESSIONAL AUDIO/VIDEO SYSTEM 1) The Contractor shall provide bi-directional RS-232 or Ethernet control system connections and programming with the following minimum functions: a) Refer to DSP Audio Processor Integration for audio requirements. b) Video conferencing dialer keypad with speed dials. c) PTZ near end camera control. h. Pan/Tilt/Zoom (PTZ) Camera Integration: 1) The Contractor shall provide bi-directional RS-232 or Ethernet control system connections and programming with the following minimum functions: a) Provide full pan, tilt and zoom control. b) Provide presets for fixed camera positions, contractor shall coordinate with the Owner for desired preset positions. i. DVD/Blu-ray and/or VCR Player Integration: 1) The Contractor shall provide bi-directional RS-232 or Ethernet control system connections and programming with the following minimum functions: a) Typical DVD/Blu-ray and/or VCR functions shall be provided. b) Real time metadata (if available). c) Player status feedback. d) Provide standard Blu-ray menu navigation Red, Green, Blue and Yellow buttons, in that order, for touch panel-based systems. j. TV Tuner Integration: 1) The Contractor shall provide bi-directional RS-232 or Ethernet control system connections and programming with the following minimum functions: a) Channel up/down control. b) Direct type in channel access. k. Power Sequencer Integration: 1) The Contractor shall provide contact closure based controlbi- directional RS-232 or Ethernet control system connections and programming with the following minimum functions: a) Power on/off control. l. Lighting Integration: 1052 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 36 PROFESSIONAL AUDIO/VIDEO SYSTEM 1) Lighting shall be integrated into the A/V control system via bi- directional RS-232 or Ethernet control. The A/V contractor shall coordinate with the lighting control contractor for full system integration. 2) Basic scene presets shall be provided for different presentation modes. a) The A/V contractor shall schedule a meeting to coordinate with the Owner and lighting control contractor for desired scene presets. 3) A master dimmer shall be provided. 4) This defines only the basic integration requirements. 5) Refer to the Electrical Lighting Integration Section 26 09 33 for additional information. B. Programming and Configuration for Touch Panels: 1. This section only defines the minimum requirements. The programmer shall provide complete touch panel layouts and programming for a fully functional system. 2. The Contractor shall schedule a series of meetings with the Owner and Architect/Engineer to define and determine the exact touch panel layout requirements prior to the purchase and installation of the touch panels. An Owner sign-off of the final layouts shall be required. a. Some tabs, pages, buttons and functions may be required to have a password at the Owner's discretion. This shall be coordinated during the meetings. 3. Contractor logos are not allowed on the touch panels. The Contractor shall coordinate with the Owner on desired logos to be displayed. 4. All programming for interface and control of all devices shown on the drawings shall be provided. Programming shall be provided for the following minimum functionality: a. The main screen shall include graphical buttons for the primary room functions. 1) Upon selection of the graphical button, all the required functions shall be displayed on the screen. All required equipment shall turn on. b. Master System On/Off Control: 1) When the master system off button is selected, all capable components within the system shall be turned off or placed on standby, except for equipment that is required to remain on for the system to function like the control system processor. 2) In the event major systems become unresponsive, a secondary power cycle button shall be available to cycle power on all equipment. 1053 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 37 PROFESSIONAL AUDIO/VIDEO SYSTEM c. The main screen shall include graphical buttons for the selection of individual source selections. 1) Upon selection of the graphical button for a source selection, all functional controls for the pieces of equipment, as well as all status indicators, shall be provided in graphical format on the screen. 2) Rooms with multiple independent outputs and displays shall have a source routing matrix to allow any input to be routed to any output. d. The main screen shall include a button for advanced equipment status and monitoring. 1) Upon selection of the graphical button, the page shall display the on/off status of all monitored equipment, projector lamp hours, projector filter status, and all other features listed within this section that require monitoring e. The main screen shall include a button for microphone volume control and muting. 1) Upon selection of the graphical button, it shall display the individual volume level of each wired and wireless microphone, with a mute for each. 2) Rooms with multiple independent audio outputs and zones shall have a source routing matrix to allow any input to be routed to any output or zone. f. At all times, on all screens, a button shall be provided to return to the main screen, except for modal pop-ups. g. A master volume control and mute shall be provided at all times on all screens, except for modal pop-ups. h. A master video mute shall be provided at all times on all screens, except for modal pop-ups and audio-only functions. i. A modal countdown timer shall be displayed showing the warmup and cooldown time of the projector. All functions shall be locked out while the projector is in cooldown mode. j. All unused hard buttons shall not be labeled. A blank touch panel bezel shall be provided if no hard buttons are used. C. Touch Panel Layout Principles, Considerations and Guidelines: 1. Icons and Buttons: a. Icons shall not be used solely as a button but can be embedded in a button. b. Icons shall appear to be flat and unpressable. c. Status bars or text windows for time, date, room number, and similar information shall appear to be slightly depressed into the screen and appear to be unpressable. d. Buttons shall appear to be pressable by appearing to come off the screen with beveled edges, lighting gradients, and shadows. When pressed, the button shall appear to be depressed into the screen. 1054 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 38 PROFESSIONAL AUDIO/VIDEO SYSTEM 1) Buttons that are momentary shall change color when pressed, appear to depress, then pop back up and revert to the original button color and state. 2) Buttons that are not momentary shall change color when pressed, appear to depress, remain depressed, then pop back up, and revert to the original button color and state when pressed again. e. Buttons and icons shall appear to be lit from the top left corner of the screen. f. Buttons shall be grouped together according to general function. g. Button size shall be based on the ratio of Phi (1:1.618) and be sized appropriately based on the screen area and dpi (pixel pitch). h. Maintain a minimum of 5 to 10 pixels between buttons on small to medium touch panels, and a minimum of 10 to 15 pixels between buttons on medium to large touch panels. i. Telephone dialer keypads shall be based on the ITU-T E.161/ANSI TI-703 standard telephone layout and include the a-z letters below each appropriate number. j. TV and radio tuner keypads shall be based on the ITU-T E.161/ANSI TI- 703 standard telephone layout, except for the asterisk (*) being replaced by a dot (.) and the pound (#) being replaced with Enter. k. IP-address keypads shall be based on the standard computer keyboard 10- key numeric keypad typically found on the right side of the keyboard. l. Buttons such as Power, Play, Stop, Record, Rewind, Previous, Forward, Eject, Return, Next, Up, Down, Left, Right, Plus, Minus, etc. shall use standard industry symbols. Record shall always be a solid red circle. 2. Text and Fonts: a. The Contractor shall use a standard sans-serif bold Arial or Calibri font style unless the Owner dictates otherwise. b. Words shall have the first letter capitalized and the rest of the word lower case. No words shall be all capitals or all lower case. Follow standard grammatically correct sentence structure where the first word is capitalized and the rest of the sentence is lower case, followed by the appropriate punctuation mark with accurate syntax and correct verbs. c. All font size in a single group or cluster shall maintain the same font size. Headers to a group or cluster shall have a slightly enlarged font size. and footers shall have a slightly smaller font size in comparison to the group font size to maintain a visual hierarchy. 3. Color Considerations: a. Colors shall be selected so that, when converted to monochrome, all text, buttons, icons, groups, clusters, borders, etc. are clearly visible to accommodate all color blind or color-impaired individuals and ADA requirements. b. Background colors shall be cool low saturation colors such as grey, blue, or green and their analogous colors, and be a gradient from top down or top left to bottom right. c. Base colors shall be analogous to the background color but be of a higher saturation to stand out more clearly. 1055 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 39 PROFESSIONAL AUDIO/VIDEO SYSTEM d. Button colors shall be analogous to the background color, stand out clearly from the base colors, and be of a higher saturation cool color, gray, or a low saturation black. e. Icon, symbols, and text color shall be a neutral white or black, or a low saturation grey, and shall clearly stand out from the background or button it is placed on. f. Buttons for modal acknowledgement, exit or return, or other modal action shall be a warm color such as red or yellow and their analogous colors. g. Buttons, icons, symbols or text for emergency or urgent notifications shall be bright red. 4. Pages and Background: a. Groups and clusters shall have clearly defined borders, with spacing between adjacent groups. b. Modal pop-up windows or pages shall be required when a command requires user input before it is executed or when a button has multiple nested elements to control, such as microphone volumes, zone control, lighting and environment control, advanced system controls, etc. 1) The modal pop-up pages shall dim and grey out the background and buttons, overlay the main page, and have a clear back or exit button to bring the user back into the active page the user was on before the modal pop-up. 2) A model pop-up timer page shall appear when a projector is being turned on or off for the appropriate warmup or cooldown time. No additional commands shall be allowed during this time. 3) Model pop-ups shall not replace or completely overlay the background. c. Images or pictures shall never be used as backgrounds to any page other than a master start page, if appropriate. 5. Medium to Large Format Touch Panel Layout Guideline Template: a. IMAGEClient Logo - Static Window b. A/V Source Selection - Static Window c. Display Power, Screen Controls, Light Controls, Shade Controls, and other Environmental Controls - Static Window d. Controls for Selected Source and Status or Home Page - Dynamic Window e. Master Volume and Mute, Video Mute, and Microphone Volume - Static Window f. Home Button - Static Window g. Date, Time, and Room Number - Static Window h. Master System Off - Static Window 6. Small Format Touch Panel Layout Guideline Template: a. A/V Source Selection and Source Control and Status After Selection - Dynamic Window b. Home Button - Static Window c. Date, Time, and Room Number - Static Window 1056 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 40 PROFESSIONAL AUDIO/VIDEO SYSTEM d. Master System Off - Static Window 7. Small Format Room Scheduling Touch Layout Guideline Template a. Room Schedule and Scheduling Control - Dynamic Window b. Chime Button - Static Window c. Date, Time, and Room Number - Static Window D. Programming and Configuration for Keypads: 1. This section only defines the minimum requirements. The programmer shall provide complete keypad layouts and programming for a fully functional system. 2. Full system programming and configuration shall be provided for the system. Programming and configuration shall be performed by a factory-trained and certified programmer or an employee of the equipment manufacturer. 3. This section only defines the minimum requirements. The programmer shall provide complete programming and configuration for a fully functional system. 4. The Contractor shall utilize the latest version of the programming and configuration software. 5. The Contractor shall ensure that all components are updated to the latest firmware at the completion of the project. 6. All programming and configuration for interface and control of all devices shown on the drawings shall be provided. Programming and configuration shall be provided for the following minimum functionality: a. A master system on and off button. 1) All capable components within the system shall be turned off or placed on standby when the system is selected to be off. b. A master volume control up/down buttons or knob and a mute c. Source select or source toggle button(s). d. All unused hard buttons shall not be labeled. 3.8 SYSTEM COMMISSIONING A. The Contractor shall notify the Owner prior to conducting final system commissioning. B. System verification testing is part of the commissioning process. Verification testing shall be performed by the Contractor and witnessed and documented by the Commissioning Agent. Refer to Section 01 09 00 - General Commissioning for system verification tests and commissioning requirements. C. Contractor shall demonstrate system performance of all equipment and adjust settings as directed by the Architect/Engineer and/or Owner. 1. All system settings, software options and other parameters shall be simulated and tested by the Contractor 1057 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 41 PROFESSIONAL AUDIO/VIDEO SYSTEM 3.9 FIELD QUALITY CONTROL A. Where these specifications require a product or assembly without the use of a brand or trade name, provide a product that meets the requirements of the specifications, as supplied and warranted by the system vendor. If the product or assembly is not available from the system vendor, provide product or assembly as recommended by the system vendor. B. Periodic observations will be performed during construction to verify compliance with the requirements of the specifications. These services do not relieve the Contractor of responsibility for compliance with the Contract Documents. 3.10 FIELD SERVICES A. The installer shall conduct a planning meeting with the Owner. The purpose of this meeting shall be to determine all equipment settings that are considered preferences (where proper system operation does not depend on the setting). B. The installer shall include labor for all planning and all programming activities required to implement the Owner's preferences for equipment settings. C. It shall be the responsibility of the Contractor/installer to provide a complete, functional system as described by the design documents. These responsibilities include: 1. Complete hardware setup, installation and wiring and software configuration. 2. Complete programming of software in accordance with the Owner's desires determined by the planning meeting. 3. Complete system diagnostic verification. 4. Complete system commissioning. 3.11 SYSTEM ACCEPTANCE A. The Contractor shall submit for review a formal acceptance and system checkout procedure. The system checkout procedures shall include all system components and software. The Contractor shall perform the tests and settings and document all results. 3.12 SYSTEM DOCUMENTATION A. Complete documentation shall be provided for the system. The documentation shall describe: 1. All operational parameters of the system. 2. Complete documentation of programming and features. 3. Complete operating instructions for all hardware and software. B. The following sections shall be provided in the system documentation: 1. User Manual: A step-by-step guide and instructions detailing all system user functions. 2. Technical Manual: A comprehensive document providing all system operations, troubleshooting flowcharts, functional system layout, wiring diagrams, block diagrams and schematic diagrams. 1058 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 27 41 00 - 42 PROFESSIONAL AUDIO/VIDEO SYSTEM 3. Maintenance Manual: A comprehensive document on all aspects of physical maintenance of the systems, including cleaning of the displays. 3.13 SYSTEM TRAINING A. All labor and materials required for on-site system training shall be provided. Training shall be conducted at the project site using the project equipment. 1. Provide two week's advanced notice of training to the Owner and Architect/Engineer. 2. The Architect/Engineer shall be presented with the option to attend the training. 3. Provide a training outline agenda describing the subject matter and the recommended audience for each topic. B. At a minimum, the following training shall be conducted: 1. User Manual: A course detailing the system functions and operations that a daily user will encounter. 2. Technical User: Provide configuration training on all aspects of the system(s), including equipment and software. 3. Maintenance User: Provide training on all aspects of physical maintenance of the systems, including cleaning of the displays, bulb changes, filter cleaning and filter changing. C. Minimum on-site training times shall be: 1. User Manual: One (1) day. 2. Technical user: One (1) day. 3. Maintenance user: Four (4) hours. END OF SECTION 27 41 00 1059 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 1 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS SECTION 28 05 00 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Basic Safety and Security System Requirements (herein referred to Security) specifically applicable to Division 28 sections, in addition to Division 1 - General Requirements. B. All materials and installation methods shall conform to the applicable standards, guidelines and codes referenced herein and within each specification section. 1.2 REFERENCES A. CCR California Code of Regulation B. CBC California Building Code C. CFC California Fire Code D. CEC California Electric Code E. CMC California Mechanical Code F. CPC California Plumbing Code G. California Title 24 - Building Energy Efficiency Standards H. SCAQMD South Coast Air Quality Management District 1.3 SCOPE OF WORK A. This Specification and the accompanying drawings govern the work involved in furnishing, installing, testing and placing into satisfactory operation the security systems as shown on the drawings and specified herein. B. Each Contractor shall provide all new materials as indicated in the schedules on the drawings, and/or in these specifications, and all items required to make the portion of the security systems a finished and working system. C. All work will be awarded under a single General Contract. The division of work listed below is for the Contractor's convenience and lists normal breakdown of the work. D. Description of systems include but are not limited to the following: 1. Electronic access control system 1060 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 2 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 2. Electronic intrusion detection system 3. Video surveillance 4. Fire detection and alarm. 5. Low voltage security wiring (less than +120VAC) as specified and required for proper system control and communications. 6. All associated electrical backboxes, conduit, miscellaneous cabling, and power supplies required for proper system installation and operation as defined in the "Suggested Matrix of Scope Responsibility". 7. Firestopping of penetrations of fire-rated construction as described in Section 28 05 03. 1.4 DIVISION OF WORK BETWEEN ELECTRICAL AND SECURITY CONTRACTORS A. Division of work is the responsibility of the Prime Contractor. Any scope of work described in the contract document shall be sufficient for including said requirement in the project. The Prime Contractor shall be solely responsible for determining the appropriate subcontractor for the described scope. In no case shall the project be assessed an additional cost for scope that is described in the contract documents. The following division of responsibility is a guideline based on typical industry practice. B. Definitions: 1. "Electrical Contractor" as referred to herein refers to the Contractors listed in Division 26 of this Specification. 2. "Electrical Contractor" shall also refer to the Contractor listed in Division 28 of this specification when the "Suggested Matrix of Scope Responsibility" indicates the work shall be provided by the EC. Refer to the Contract Documents for the "Suggested Matrix of Scope Responsibility". 3. "Security Contractor" as referred to herein refers to the Contractors listed in Division 28 of this Specification. 4. Low Voltage Security Wiring: The wiring (less than 120VAC) associated with the Security Systems, used for analog and/or digital signals between equipment. C. General: 1. The purpose of these Specifications is to outline typical Electrical and Security Contractor's work responsibilities as related to security systems including back boxes, conduit, cable tray, power wiring and low voltage security wiring. The prime contractor is responsible for all divisions of work. 2. The exact wiring requirements for much of the equipment cannot be determined until the systems have been purchased and submittals are approved. Therefore, only known wiring, conduits, raceways, and electrical power as related to such items, is shown on the Security Drawings. Other wiring, conduits, raceways, junction boxes, and electrical power not shown on the Security Drawings but required for the successful operation of the systems shall be the responsibility of the Security Contractor and included in the Contractor's bid. 1061 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 3 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3. Where the Electrical Contractor is required to install conduit, conduit sleeves and/or power connections in support of Security systems, the final installation shall not begin until a coordination meeting between the Electrical Contractor and the Security Contractor has convened to determine the exact location and requirements of the installation. 4. Where the Electrical Contractor is required to install cable tray that will contain Low Voltage Security Wiring, the installation shall not begin until the Security Contractor has completed a coordination review of the cable tray shop drawing. 5. This Contractor shall establish Electrical and Security utility elevations prior to fabrication and installation. The Security Contractor shall cooperate with the Electrical Contractor and the determined elevations in accordance with the guidelines below. This Contractor shall coordinate utility elevations with other trades. When a conflict arises, priority shall be as follows: a. Lighting Fixtures b. Gravity Flow Piping, including Steam and Condensate c. Sheet Metal d. Electrical Busduct e. Cable Trays, including 12" access space f. Sprinkler Piping and other Piping g. Conduit and Wireway h. Open Cabling D. Electrical Contractor's Responsibility: 1. Assumes all responsibility for all required conduit and power connections when shown on the "Suggested Matrix of Scope Responsibility" to be provided by the Electrical Contractor. 2. Assumes all responsibility for providing and installing cable tray. 3. Responsible for Security Systems grounding and bonding. 4. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout. E. Security Contractor's Responsibility: 1. Assumes all responsibility for the low voltage security wiring of all systems, including cable support where open cable is specified. 2. Assumes all responsibility for all required backboxes, conduit and power connections not specifically shown as being provided by the Electrical Contractor on the "Suggested Matrix of Scope Responsibility." 3. Responsible for providing the Electrical Contractor with the required grounding lugs or other hardware for each piece of security equipment which is required to be bonded to the telecommunications bonding system. 1062 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 4 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 1.5 COORDINATION DRAWINGS A. Definitions: 1. Coordination Drawings: A compilation of the pertinent layout and system drawings that show the sizes and locations, including elevations, of system components and required access areas to ensure that no two objects will occupy the same space. a. Mechanical trades shall include, but are not limited to, mechanical equipment, ductwork, fire protection systems, plumbing piping, medical gas systems, hydronic piping, steam and steam condensate piping, and any item that may impact coordination with other disciplines. b. Electrical trades shall include, but are not limited to, electrical equipment, conduit 1.5" and larger, conduit racks, cable trays, pull boxes, transformers, raceway, busway, lighting, ceiling-mounted devices, and any item that may impact coordination with other disciplines. c. Technology trades shall include, but are not limited to, technology equipment, racks, conduit 1.5" and larger, conduit racks, cable trays, ladder rack, pull boxes, raceway, ceiling-mounted devices, and any item that may impact coordination with other disciplines. d. Maintenance clearances and code-required dedicated space shall be included. e. The coordination drawings shall include all underground, underfloor, in- floor, in chase, and vertical trade items. 2. The contractors shall use the coordination process to identify the proper sequence of installation of all utilities above ceilings and in other congested areas, to ensure an orderly and coordinated end result, and to provide adequate access for service and maintenance. B. Participation: 1. The contractors and subcontractors responsible for work defined above shall participate in the coordination drawing process. 2. One contractor shall be designated as the Coordinating Contractor for purposes of preparing a complete set of composite electronic CAD coordination drawings that include all applicable trades, and for coordinating the activities related to this process. The Coordinating Contractor for this project shall be the Mechanical Contractor. a. The Coordinating Contractor shall utilize personnel familiar with requirements of this project and skilled as draftspersons/CAD operators, competent to prepare the required coordination drawings. 1063 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 5 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3. Electronic CAD drawings shall be submitted to the Coordinating Contractor for addition of work by other trades. IMEG will provide electronic file copies of ventilation drawings for contractor's use if the contractor signs and returns an "Electronic File Transfer" waiver provided by IMEG. IMEG will not consider blatant reproductions of original file copies an acceptable alternative for coordination drawings. C. Drawing Requirements: 1. The file format and file naming convention shall be coordinated with and agreed to by all contractors participating in the coordination process and the Owner. a. Scale of drawings: 1) General plans: 1/4 Inch = 1 '-0" (minimum). 2) Mechanical, electrical, communication rooms, and including the surrounding areas within 10 feet: 1/2 Inch = 1'-0" (minimum). 3) Shafts and risers: 1/2 Inch = 1'-0" (minimum). 4) Sections of shafts and mechanical and electrical equipment rooms: 1/4 Inch = 1 '-0" (minimum). 5) Sections of congested areas: 1/2 Inch = 1'-0" (minimum). 2. Ductwork layout drawings shall be the baseline system for other components. Ductwork layout drawings shall be modified to accommodate other components as the coordination process progresses. 3. There may be more drawings required for risers, top and bottom levels of mechanical rooms, and shafts. 4. The minimum quantity of drawings will be established at the first coordination meeting and sent to the A/E for review. Additional drawings may be required if other areas of congestion are discovered during the coordination process. D. General: 1. Coordination drawing files shall be made available to the A/E and Owner's Representative. The A/E will only review identified conflicts and give an opinion, but will not perform as a coordinator. 2. A plotted set of coordination drawings shall be available at the project site. 3. Coordination drawings are not shop drawings and shall not be submitted as such. 4. The contract drawings are schematic in nature and do not show every fitting and appurtenance for each utility. Each contractor is expected to have included in the bid sufficient fittings, material, and labor to allow for adjustments in routing of utilities made necessary by the coordination process and to provide a complete and functional system. 5. The contractors will not be allowed additional costs or time extensions due to participation in the coordination process. 6. The contractors will not be allowed additional costs or time extensions for additional fittings, reroutings or changes of duct size, that are essentially equivalent sizes to those shown on the drawings and determined necessary through the coordination process. 1064 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 6 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 7. The A/E reserves the right to determine space priority of equipment in the event of spatial conflicts or interference between equipment, piping, conduit, ducts, and equipment provided by the trades. 8. Changes to the contract documents that are necessary for systems installation and coordination shall be brought to the attention of the A/E. 9. Access panels shall preferably occur only in gypsum board walls or plaster ceilings where indicated on the drawings. a. Access to mechanical, electrical, technology, and other items located above the ceiling shall be through accessible lay-in ceiling tile areas. b. Potential layout changes shall be made to avoid additional access panels. c. Additional access panels shall not be allowed without written approval from the A/E at the coordination drawing stage. d. Providing additional access panels shall be considered after other alternatives are reviewed and discarded by the A/E and the Owner's Representative. e. When additional access panels are required, they shall be provided without additional cost to the Owner. 10. Complete the coordination drawing process and obtain signoff of the drawings by all contractors prior to installing any of the components. 11. Conflicts that result after the coordination drawings are signed off shall be the responsibility of the contractor or subcontractor who did not properly identify their work requirements, or installed their work without proper coordination. 12. Updated coordination drawings that reflect as-built conditions may be used as record documents. 1.6 QUALITY ASSURANCE A. Qualifications: 1. Only products of reputable manufacturers as determined by the Architect/Engineer will be acceptable. 2. Each Contractor and their subcontractors shall employ only workers who are skilled in their respective trades and fully trained. All workers involved in the installation, termination, testing, and placing into operation electronic security devices shall be individually trained by the manufacturer. 3. The Contractor shall be experienced in all aspects of this work and shall be required to demonstrate direct experience on recent systems of similar type and size. 4. The Contractor shall own and maintain tools and equipment necessary for successful installation and testing of electronic security devices and have personnel adequately trained in the use of such tools and equipment. B. Compliance with Codes, Laws, Ordinances: 1. Conform to all requirements of the State of California Codes, Laws, Ordinances and other regulations having jurisdiction. 2. Conform to all published standards of City of Moorpark. 1065 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 7 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3. In the event there are no local codes having jurisdiction over this job, the current issue of the National Electrical Code shall be followed. 4. If there is a discrepancy between the codes and regulations having jurisdiction over this installation, and these specifications, Architect/Engineer shall determine the method or equipment used. 5. If the Contractor notes, at the time of bidding, that any parts of the drawings or specifications do not comply with the codes or regulations, Contractor shall inform the Architect/Engineer in writing, requesting a clarification. If there is insufficient time to follow this procedure, Contractor shall submit with the proposal a separate price to make the system comply with the codes and regulations. 6. Verify the installation environment prior to purchasing or installing any cable. Cable installed in a plenum environment shall be appropriately rated. Bring all discrepancies between the contract documents and installation conditions to the attention of the Architect/Engineer prior to purchase or installation. 7. All changes to the system made after the letting of the contract, in order to comply with the applicable codes or the requirements of the Inspector, shall be made by the Contractor without cost to the Owner. C. Permits, Fees, Taxes, Inspections: 1. Procure all applicable permits and licenses. 2. Abide by all applicable laws, regulations, ordinances, and other rules of the State or Political Subdivision wherein the work is done, or as required by any duly constituted public authority. 3. Pay all applicable charges for such permits or licenses that may be required. 4. Pay all applicable fees and taxes imposed by the State, Municipal and/or other regulatory bodies. 5. Pay all charges arising out of required inspections due to codes, permits as applicable licenses or as otherwise may be required by an authorized body 6. Pay all charges arising out of required contract document reviews associated as applicable with the project and as initiated by the Owner or authorized independent agency/consultant. 7. All equipment, and materials shall be as approved or listed by the following: (Unless approval or listing is not applicable to an item by all acceptable manufacturers.) a. Factory Mutual b. Underwriters' Laboratories, Inc. D. Examination of Drawings: 1. The drawings for the Security Systems work are diagrammatic, intended to convey the scope of the work and to indicate the general arrangements and locations of equipment etc., and the approximate sizes of equipment. 2. Contractor shall determine the exact locations of equipment and the exact routing of cabling to best fit the layout of the job. Scaling of the drawings will not be sufficient or accurate for determining this layout. Where a specific route is required, such route will be indicated on the drawings. 1066 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 8 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3. Where job conditions require reasonable changes in indicated arrangements and locations, such changes shall be made by the Contractor at no additional cost to the Owner. 4. If an item is either shown on the drawings, called for in the specifications or required for proper operation of the system, it shall be considered sufficient for including same in this contract. 5. The determination of quantities of material and equipment required shall be made by the Contractor from the drawings. Schedules on the drawings and in the specifications are completed as an aid to the Contractor but where discrepancies arise, the greater number shall govern. 6. Where words "provide", "install", or "furnish" are used on the drawings or in the specifications, it shall be taken to mean, to furnish, install and terminate completely ready for operation, the items mentioned. E. Electronic Media/Files: 1. Construction drawings for this project have been prepared utilizing Revit. 2. Contractors and Subcontractors may request electronic media files of the contract drawings and/or copies of the specifications. Specifications will be provided in PDF format. 3. Upon request for electronic media, the Contractor shall complete and return a signed "Electronic File Transmittal" form provided by IMEG. If the information requested includes floor plans prepared by others, the Contractor will be responsible for obtaining approval from the appropriate Design Professional for use of that part of the document. 4. The electronic contract documents can be used for preparation of shop drawings and as-built drawings only. The information may not be used in whole or in part for any other project. 5. The drawings prepared by IMEG for bidding purposes may not be used directly for ductwork layout drawings or coordination drawings. 6. The use of these CAD documents by the Contractor does not relieve them from their responsibility for coordination of work with other trades and verification of space available for the installation. 7. The information is provided to expedite the project and assist the Contractor with no guarantee by IMEG as to the accuracy or correctness of the information provided. IMEG accepts no responsibility or liability for the Contractor's use of these documents. 8. The use of these documents by the Contractor does not relieve them from their responsibility for coordination of work with other trades and verification of space available for the installation. F. Field Measurements: 1. Before ordering any materials, this Contractor shall verify all pertinent dimensions at the job site and be responsible for their accuracy. 1.7 SUBMITTALS A. Submittals shall be required for the following items, and for additional items where required elsewhere in the specifications or on the drawings. 1067 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 9 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 1. Submittals list: Referenced Specification Section Submittal Item Coordination Drawings 28 05 03 Through-Penetration Firestopping 28 13 00 Electronic Access Control 28 16 00 Intrusion Detection System Yes 28 23 00 Video Surveillance Yes B. General Submittal Procedures: In addition to the provisions of Division 1, the following are required: 1. Transmittal: Each transmittal shall include the following: a. Date b. Project title and number c. Contractor's name and address d. Division of work (e.g., plumbing, heating, ventilating, etc.) e. Description of items submitted and relevant specification number f. Notations of deviations from the contract documents g. Other pertinent data 2. Submittal Cover Sheet: Each submittal shall include a cover sheet containing: a. Date b. Project title and number c. Architect/Engineer d. Contractor and subcontractors' names and addresses e. Supplier and manufacturer's names and addresses f. Division of work (e.g., plumbing, heating, ventilating, etc.) g. Description of item submitted (using project nomenclature) and relevant specification number h. Notations of deviations from the contract documents i. Other pertinent data j. Provide space for Contractor's review stamps 3. Composition: a. Submittals shall be submitted using specification sections and the project nomenclature for each item. b. Individual submittal packages shall be prepared for items in each specification section. All items within a single specification section shall be packaged together where possible. An individual submittal may contain items from multiple specifications sections if the items are intimately linked (e.g., pumps and motors). c. All sets shall contain an index of the items enclosed with a general topic description on the cover. 1068 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 10 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 4. Content: Submittals shall include all fabrication, erection, layout, and setting drawings; manufacturers' standard drawings; schedules; descriptive literature, catalogs and brochures; performance and test data; wiring and control diagrams; dimensions; shipping and operating weights; shipping splits; service clearances; and all other drawings and descriptive data of materials of construction as may be required to show that the materials, equipment or systems and the location thereof conform to the requirements of the contract documents. 5. Contractor's Approval Stamp: a. The Contractor shall thoroughly review and approve all shop drawings before submitting them to the Architect/Engineer. The Contractor shall stamp, date and sign each submittal certifying it has been reviewed. b. Unstamped submittals will be rejected. c. The Contractor's review shall include, but not be limited to, verification of the following: 1) Only approved manufacturers are used. 2) Addenda items have been incorporated. 3) Catalog numbers and options match those specified. 4) Performance data matches that specified. 5) Electrical characteristics and loads match those specified. 6) Equipment connection locations, sizes, capacities, etc. have been coordinated with other affected trades. 7) Dimensions and service clearances are suitable for the intended location. 8) Equipment dimensions are coordinated with support steel, housekeeping pads, openings, etc. 9) Constructability issues are resolved (e.g., weights and dimensions are suitable for getting the item into the building and into place, sinks fit into countertops, etc.). d. The Contractor shall review, stamp and approve all subcontractors' submittals as described above. e. The Contractor's approval stamp is required on all submittals. Approval will indicate the Contractor's review of all material and a complete understanding of exactly what is to be furnished. Contractor shall clearly mark all deviations from the contract documents on all submittals. If deviations are not marked by the Contractor, then the item shall be required to meet all drawing and specification requirements. 6. Submittal Identification and Markings: a. The Contractor shall clearly mark each item with the same nomenclature applied on the drawings or in the specifications. b. The Contractor shall clearly indicate the size, finish, material, etc. c. Where more than one model is shown on a manufacturer's sheet, the Contractor shall clearly indicate exactly which item and which data is intended. d. All marks and identifications on the submittals shall be unambiguous. 1069 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 11 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 7. Schedule submittals to expedite the project. Coordinate submission of related items. 8. Identify variations from the contract documents and product or system limitations that may be detrimental to the successful performance of the completed work. 9. Reproduction of contract documents alone is not acceptable for submittals. 10. Incomplete submittals will be rejected without review. Partial submittals will only be reviewed with prior approval from the Architect/Engineer. 11. Submittals not required by the contract documents may be returned without review. 12. The Architect/Engineer's responsibility shall be to review one set of shop drawing submittals for each product. If the first submittal is incomplete or does not comply with the drawings and/or specifications, the Contractor shall be responsible to bear the cost for the Architect/Engineer to recheck and handle the additional shop drawing submittals. 13. Submittals shall be reviewed and approved by the Architect/Engineer before releasing any equipment for manufacture or shipment. 14. Contractor's responsibility for errors, omissions or deviation from the contract documents in submittals is not relieved by the Architect/Engineer's approval. 15. Schedule shall allow for adequate time to perform orderly and proper review of submittals, including time for consultants and Owner if required, and resubmittals by Contractor if necessary, and to cause no delay in Work or in activities of Owner or other contractors. a. Allow at least two weeks for Architect's/Engineer's review and processing of each submittal. 16. Architect/Engineer reserves the right to withhold action on a submittal which, in the Architect/Engineer's opinion, requires coordination with other submittals until related submittals are received. The Architect/Engineer will notify the Contractor, in writing, when they exercise this right. C. Electronic Submittal Procedures: 1. Distribution: Email submittals as attachments to all parties designated by the Architect/Engineer, unless a web-based submittal program is used. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. Submittal file name: 28 XX XX.description.YYYYMMDD b. Transmittal file name: 28 XX XX.description.YYYYMMDD 1070 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 12 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 1.8 PRODUCT DELIVERY, STORAGE, HANDLING & MAINTENANCE A. Exercise care in transporting and handling to prevent damage to fixtures, equipment and materials. B. Store materials on the site to prevent damage. C. Keep fixtures, equipment and materials clean, dry and free from harmful conditions. 1.9 NETWORK / INTERNET CONNECTED EQUIPMENT A. These specifications may require certain equipment or systems to have network, Internet and/or remote access capability ("Network Capability"). Any requirement for Network Capability shall be interpreted only as a functional capability and is not to be construed as authority to connect or enable any Network Capability. Network Capability may only be connected or enabled with the express written consent of the Owner. 1.10 WARRANTY A. At a minimum, provide a one (1) year warranty for all equipment, materials, and workmanship. Individual specifications sections within Division 28 may require additional warranty requirements for specific equipment or systems. B. The warranty period for the entire installation described in this Division of the specifications shall commence on the date of substantial completion unless a whole or partial system or any separate piece of equipment or component is put into use for the benefit of any party other than the installing contractor with prior written authorization. In this instance, the warranty period shall commence on the date when such whole system, partial system or separate piece of equipment or component is placed in operation and accepted in writing by the Owner or their representative. C. Warranty requirements shall extend to correction, without cost to the final user, of all work and/or equipment found to be defective or nonconforming to the contract documents. The Contractor shall bear the cost of correcting all damage resulting from such defects or nonconformance with contract documents exclusive of repairs required as a result of improper maintenance or operation, or of normal wear as determined by the Architect/Engineer. 1.11 INSURANCE A. Contractor shall maintain insurance coverage as set forth in Division 0 of these specifications. 1071 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 13 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS PART 2 - PRODUCTS 2.1 Refer to individual sections. PART 3 - EXECUTION 3.1 JOBSITE SAFETY A. Neither the professional activities of the Architect/Engineer, nor the presence of the Architect/Engineer or the employees and subconsultants at a construction site, shall relieve the Contractor and any other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions of the work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Architect/Engineer and personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The Contractor is solely responsible for jobsite safety. The Architect/Engineer and the Architect/Engineer's consultants shall be indemnified and shall be made additional insureds under the Contractor's general liability insurance policy. 3.2 GENERAL INSTALLATION REQUIREMENTS A. Installation of all conduit and cabling shall comply with Sections 26 05 33 and 26 05 13. Additional conduit requirements described within this Division shall be supplemental to the requirement described in Section 26 05 33. Should conflicts exist between the two Divisions the more stringent (more expensive material and labor) condition shall prevail until bidding addendum or construction clarification or RFI can be submitted and responded to. In no case shall the Contractor carry the least stringent condition in the pricing. B. It is the Contractor's responsibility to survey the site and include all necessary costs to perform the installation as specified. C. The Contractor shall be responsible for identifying and reporting to the Architect/Engineer any existing conditions including but not limited to damage to walls, flooring, ceiling and furnishings prior to start of work. All damage to interior spaces caused by this Contractor shall be repaired at this Contractor's expense to pre-existing conditions, including final colors and finishes. D. All cables and devices installed in damp or wet locations, including any underground or underslab location, shall be listed as suitable for use in such environments. Follow manufacturer's recommended installation practices for installing cables and devices in damp or wet locations. Any cable or device that fails as a result of being installed in a damp or wet location shall be replaced at the Contractor's expense. 1072 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 14 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3.3 FIELD QUALITY CONTROL A. General: 1. Refer to specific Division 28 sections for further requirements. 2. The Contractor shall conduct all tests required and applicable to the work both during and after construction of the work. 3. The necessary instruments and materials required to conduct or make the tests shall be supplied by the Contractor who shall also supply competent personnel for making the tests who has been schooled in the proper testing techniques. 4. In the event the results obtained in the tests are not satisfactory, This Contractor shall make such adjustments, replacements and changes as are necessary and shall then repeat the test or tests which disclose faulty or defective work or equipment, and shall make such additional tests as the Architect/Engineer or code enforcing agency deems necessary. B. Protection of cable from foreign materials: 1. It is the Contractor's responsibility to provide adequate physical protection to prevent foreign material application or contact with any cable type. Foreign material is defined as any material that would negatively impact the validity of the manufacturer's performance warranty. This includes, but is not limited, to overspray of paint (accidental or otherwise), drywall compound, or any other surface chemical, liquid or compound that could come in contact with the cable, cable jacket or cable termination components. 2. Application of foreign materials of any kind on any cable, cable jacket or cable termination component will not be accepted. It shall be the Contractor's responsibility to replace any component containing overspray, in its entirety, at no additional cost to the project. Cleaning of the cables with harsh chemicals is not allowed. This requirement is regardless of the PASS/FAIL test results of the cable containing overspray. Should the manufacturer and warrantor of the structured cabling system desire to physically inspect the installed condition and certify the validity of the structured cabling system (via a signed and dated statement by an authorized representative of the structured cabling manufacturer), the Owner may, at their sole discretion, agree to accept said warranty in lieu of having the affected cables replaced. In the case of plenum cabling, in addition to the statement from the manufacturer, the Contractor shall also present to the Owner a letter from the local Authority Having Jurisdiction stating that they consider the plenum rating of the cable to be intact and acceptable. 3.4 PROJECT CLOSEOUT A. Refer to the Division 1 Section: PROJECT CLOSEOUT for requirements. The following paragraphs supplement the requirements of Division 1. B. Final Jobsite Observation: 1073 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 15 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 1. The Architect/Engineer will not perform a final jobsite observation until the project is ready. This is not dictated by schedule, but rather by completeness of the project. 2. Refer to the end of this section for a "STATEMENT INDICATING READINESS FOR FINAL JOBSITE OBSERVATION." 3. The Contractor shall sign this form and return it to the Architect/Engineer so that the final observation can commence. C. Before final payment will be authorized, this Contractor must have completed the following: 1. Submitted operation and maintenance manuals to the Architect/Engineer for review. 2. Submitted bound copies of approved shop drawings. 3. Record documents including edited drawings and specifications accurately reflecting field conditions, inclusive of all project revisions, change orders, and modifications. 4. Submitted a report stating the instructions given to the Owner's representative complete with the number of hours spent in the instruction. The report shall bear the signature of an authorized agent of This Contractor and shall be signed by the Owner's representative as having received the instructions. 5. Submitted testing reports for all systems requiring final testing as described herein. 6. Submitted start-up reports on all equipment requiring a factory installation inspection and/or start. 7. Provide spare parts, maintenance, and extra materials in quantities specified in individual specification sections. Deliver to project site; submit receipt to Architect/Engineer prior to final payment being approved. 3.5 OPERATION AND MAINTENANCE MANUALS A. General: 1. Provide an electronic copy of the O&M manuals as described below for Architect/Engineer's review and approval. The electronic copy shall be corrected as required to address the Architect/Engineer's comments. Once corrected, electronic copies and paper copies shall be distributed as directed by the Architect/Engineer. 2. Approved O&M manuals shall be completed and in the Owner's possession prior to Owner's acceptance and at least 10 days prior to instruction of operating personnel. B. Electronic Submittal Procedures: 1. Distribution: Email the O&M manual as attachments to all parties designated by the Architect/Engineer. 2. Transmittals: Each submittal shall include an individual electronic letter of transmittal. 1074 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 16 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3. Format: Electronic submittals shall be in PDF format only. Scanned copies, in PDF format, of paper originals are acceptable. Submittals that are not legible will be rejected. Do not set any permission restrictions on files; protected, locked, or secured documents will be rejected. 4. File Names: Electronic submittal file names shall include the relevant specification section number followed by a description of the item submitted, as follows. Where possible, include the transmittal as the first page of the PDF instead of using multiple electronic files. a. O&M file name: O&M.div28.contractor.YYYYMMDD b. Transmittal file name: O&Mtransmittal.div28.contractor.YYYYMMDD 5. File Size: Files shall be transmitted via a pre-approved method. Larger files may require an alternative transfer method, which shall also be pre-approved. 6. Provide the Owner with an approved copy of the O&M manual on compact discs (CD), digital video discs (DVD), or flash drives with a permanently affixed label, printed with the title "Operation and Maintenance Instructions", title of the project and subject matter of disc/flash drive when multiple disc/flash drives are required. 7. All text shall be searchable. 8. Bookmarks shall be used, dividing information first by specification section, then systems, major equipment and finally individual items. All bookmark titles shall include the nomenclature used in the construction documents and shall be an active link to the first page of the section being referenced. C. Operation and Maintenance Instructions shall include: 1. Title Page: Include title page with project title, Architect, Engineer, Contractor, all subcontractors, and major equipment suppliers, with addresses, telephone numbers, website addresses, email addresses and point of contacts. Website URLs and email addresses shall be active links in the electronic submittal. 2. Table of Contents: Include a table of contents describing specification section, systems, major equipment, and individual items. 3. Copies of all final approved shop drawings and submittals. Include Architect's/Engineer's shop drawing review comments. Insert the individual shop drawing directly after the Operation and Maintenance information for the item(s) in the review form. 4. Copy of final approved test and balance reports. 5. Copies of all factory inspections and/or equipment startup reports. 6. Copies of warranties. 7. Schematic wiring diagrams of the equipment that have been updated for field conditions. Field wiring shall have label numbers to match drawings. 8. Dimensional drawings of equipment. 9. Capacities and utility consumption of equipment. 10. Detailed parts lists with lists of suppliers. 11. Operating procedures for each system. 12. Maintenance schedule and procedures. Include a chart listing maintenance requirements and frequency. 13. Repair procedures for major components. 14. List of lubricants in all equipment and recommended frequency of lubrication. 15. Instruction books, cards, and manuals furnished with the equipment. 1075 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 17 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3.6 INSTRUCTING THE OWNER'S REPRESENTATIVE A. Adequately instruct the Owner's designated representative or representatives in the maintenance, care, and operation of the complete systems installed under this contract. B. Provide verbal and written instructions to the Owner's representative or representatives by FACTORY PERSONNEL in the care, maintenance, and operation of the equipment and systems. C. The Owner has the option to make a video recording of all instructions. Coordinate schedule of instructions to facilitate this recording. D. Notify the Architect/Engineer of the time and place for the verbal instructions to be given to the Owner's representative so a representative can be present if desired. E. Refer to the individual specification sections for minimum hours of instruction time for each system. F. Operating Instructions: 1. The Contractor is responsible for all instructions to the Owner and/or Owner's operating staff on the security systems. 2. If the Contractor does not have Engineers and/or Technicians on staff that can adequately provide the required instructions on system operation, performance, troubleshooting, care and maintenance, the Contractor shall include in the bid an adequate amount to reimburse the Owner for the Architect/Engineer to perform these services. 3.7 SYSTEM STARTING AND ADJUSTING A. The security systems included in the construction documents are to be complete and operating systems. The Architect/Engineer will make periodic job site observations during the construction period. The system start-up, testing, configuration, and satisfactory system performance is the responsibility of the Contractor. This shall include all calibration and adjustments of electrical equipment controls, equipment settings, software configuration, troubleshooting and verification of software, and final adjustments that may be required. B. All operating conditions and control sequences shall be simulated and tested during the start-up period. 1076 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 18 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS C. The Contractor, subcontractors, and equipment suppliers are expected to have skilled technicians to ensure that the system performs as designed. If the Architect/Engineer is requested to visit the job site for the purpose of trouble shooting, assisting in the satisfactory start-up, obtaining satisfactory equipment operation, resolving installation and/or workmanship problems, equipment substitution issues or unsatisfactory system performance, including call backs during the warranty period through no fault of the design; the Contractor shall reimburse the Owner on a time and material basis for services rendered at the Architect/Engineer's standard hourly rates in effect at the time the services are requested. The Contractor shall be responsible for making payment to the Owner for services required that are product, installation or workmanship related. Payment is due within 30 days after services are rendered. 3.8 RECORD DOCUMENTS A. Refer to the Division 1 Section: PROJECT CLOSEOUT for requirements. The following paragraphs supplement the requirements of Division 1. B. Mark specifications to indicate approved substitutions, change orders, and actual equipment and materials used. C. This Contractor shall maintain at the job site, a separate and complete set of Security Drawings which shall be clearly and permanently marked and noted in complete detail any changes made to the location and arrangement of equipment or made to the Technology Systems and wiring as a result of building construction conditions or as a result of instructions from the Architect or Engineer. All Change Orders, RFI responses, Clarifications and other supplemental instructions shall be marked on the documents. Record documents that merely reference the existence of the above items are not acceptable. Should This Contractor fail to complete Record Documents as required by this contract, This Contractor shall reimburse Architect/Engineer for all costs to develop record documents that comply with this requirement. Reimbursement shall be made at the Architect/Engineer's hourly rates in effect at the time of work. D. Record actual routing of all conduits sized 2" or larger. E. The above record of changes shall be made available for the Architect and Engineer's examination during any regular work time. F. Upon completion of the job, and before final payment is made, This Contractor shall give the marked-up drawings to the Architect/Engineer. 3.9 ADJUST AND CLEAN A. Contractor shall thoroughly clean all equipment and systems prior to the Owner's final acceptance of the project. B. Contractor shall clean all foreign paint, grease, oil, dirt, labels, stickers, and other foreign material from equipment. C. Contractor shall remove all rubbish, debris, etc., accumulated during the Contractor's operations from the premises. 1077 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 19 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 3.10 SPECIAL REQUIREMENTS A. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards:CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 1. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 2. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. STATEMENT INDICATING 1078 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 00 - 20 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS READINESS FOR FINAL JOBSITE OBSERVATION To assist the contractor in a timely close-out of the project, it is crucial that the final jobsite observation is not conducted prior to the project being ready. The contractor is required to review the completion status of the project at the time the observation is scheduled. This review, and the subsequent submittal of this form to the Architect/Engineer, shall indicate the contractor's agreement that the area of the project being requested for final observation is ready as defined below. The following list represents the degree of completeness required prior to requesting a final observation: 1. All cabling pathways (cable tray, ladder rack, conduit sleeves, etc.) are installed and all cabling has been pulled through them. 2. All mechanical firestop products are installed and all other penetrations have been sealed. 3. All CCTV cameras, mounts, cabling and all headend equipment are installed, programmed and operational. 4. All access control system equipment, including card readers, conduits, cabling, electronic locks, controllers and all headend equipment, is installed, programmed and operational. Prime Contractor: _________________________ By: _____________________________ Requested Observation Date ________________ Today's Date: _____________________ Contractor shall sign this readiness statement and transmit to Architect/Engineer at least 10 days prior to the requested date of observation. It is understood that if the Architect/Engineer finds that the project is not complete as defined above and that the final jobsite observation cannot be completed on the requested date, the Architect/Engineer will return to the site at a later date. All additional visits to the site for the purposes of completing the final observation will be billed T&M to the Contractor at our standard hourly rates, including travel expenses or the contractor's retainage may be deducted for the same amount. END OF SECTION 28 05 00 1079 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 03 - 1 THROUGH PENETRATION FIRESTOPPING SECTION 28 05 03 THROUGH PENETRATION FIRESTOPPING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Through-Penetration Firestopping. 1.2 QUALITY ASSURANCE A. Manufacturer: Company specializing in manufacturing products specified in this Section. B. Installer: Individuals performing work shall be certified by the manufacturer of the system selected for installation. 1.3 REFERENCES A. UL 263 - Fire Tests of Building Construction and Materials B. UL 723 - Surface Burning Characteristics of Building Materials C. ANSI/UL 1479 - Fire Tests of Through Penetration Firestops D. UL 2079 Tests for Fire Resistance of Building Joint Systems E. UL Fire Resistance Directory Through Penetration Firestop Systems (XHEZ) F. Intertek / Warnock Hersey - Directory of Listed Products G. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials H. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops I. CBC California Building Code J. 2018 International Building Code 1.4 SUBMITTALS A. Submit under provisions of Section 28 05 00. B. Submit Firestopping Installers Certification for all installers on the project. 1080 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 03 - 2 THROUGH PENETRATION FIRESTOPPING C. Shop Drawings: Submit for each condition requiring firestopping. Include descriptions of the specific penetrating item, actual wall/floor construction, manufacturer's installation instructions, and UL or Intertek / Warnock Hersey Assembly number. D. Through-Penetration Firestop System Schedule: Indicate locations of each through- penetration firestop system, along with the following information: 1. Types of penetrating items. 2. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated. 3. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency. 4. F ratings for each firestop system. E. Maintain a notebook on the job site at all times that contains copies of approved submittals for all through penetration firestopping to be installed. Notebook shall be made available to the Authority Having Jurisdiction at their request and turned over to the Owner at the end of construction as part of the O&M Manuals. F. Submit VOC rating of firestopping material in g/L (less water) with documentation that it meets the limits set forth in SCAQMD Rule 1168. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store, protect and handle products on site. Accept material on site in factory containers and packing. Inspect for damage. Protect from deterioration or damage due to moisture, temperature changes, contaminants, or other causes. Follow manufacturer's instructions for storage. B. Install material prior to expiration of product shelf life. 1.6 PERFORMANCE REQUIREMENTS A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through- penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. 1. Fire-resistance-rated walls including fire partitions, fire barriers, and smoke barriers. B. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per UL 1479: 1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated. 2. L-Rated Systems: Provide through-penetration firestop systems with L-ratings of not more than 5.0 cfm/sq.ft. at both ambient temperature and 400°°F. 1081 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 03 - 3 THROUGH PENETRATION FIRESTOPPING C. For through-penetration firestop systems exposed to light, traffic, moisture, or physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction. D. For through-penetration firestop systems exposed to view, provide products with flame- spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84. E. For through-penetration firestop systems in air plenums, provide products with flame-spread and smoke-developed indexes of less than 25 and 50, respectively, as determined per ASTM E 84. F. Adhesives and Sealants: All sealers, adhesives, and sealants shall comply with the low emitting material limits of the following standards: 1. CDPH Standard Method V1.1-2010 - Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions VOC from Indoor Sources Using Environmental Chambers Version 1.1. 2. South Coast Air Quality Management District Rule 1168 - Adhesive and Sealant Applications. All adhesives and sealants wet-applied on site shall comply with the applicable chemical content requirements of SCAQMD Rule 1168. 3. South Coast Air Quality Management District Rule SCAQMD 1113 - Wet Applied Paints and Coatings. All paints and coatings wet-applied on site must meet the applicable VOC limits of SCAQMD Rule 1113. 1.7 MEETINGS A. Pre-installation meeting: A pre-installation meeting shall be scheduled and shall include the Construction Manager, General Contractor, all Subcontractors associated with the installation of systems penetrating fire barriers, Firestopping Manufacturer's Representative, and the Owner. 1. Review foreseeable methods related to firestopping work. 2. Tour representative areas where firestopping is to be installed; inspect and discuss each type of condition and each type of substrate that will be encountered, and preparation to be performed by other trades. 1.8 WARRANTY A. Provide one year warranty on parts and labor. B. Warranty shall cover repair or replacement of firestop systems which fail in joint adhesion, cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, general durability, or appear to deteriorate in any manner not clearly specified by the manufacturer as an inherent quality of the material. 1082 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 03 - 4 THROUGH PENETRATION FIRESTOPPING PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Products: Subject to compliance with requirements, provide one of the through-penetration firestop systems indicated for each application that are produced by one of the following manufacturers. All firestopping systems installed shall be provided by a single manufacturer. 1. 3M; Fire Protection Products Division 2. Hilti, Inc. 3. RectorSeal Corporation, Metacaulk 4. Tremco; Sealant/Weatherproofing Division 5. Johns-Manville 6. Specified Technologies Inc. (S.T.I.) 7. Spec Seal Firestop Products 8. AD Firebarrier Protection Systems 9. Wiremold/Legrand: FlameStopper 10. Dow Corning Corp 11. Fire Trak Corp 12. International Protective Coating Corp 2.2 THROUGH PENETRATION FIRESTOP SYSTEMS A. Provide materials and systems classified by or listed by Intertek / Warnock Hersey to provide firestopping equal to time rating of construction being penetrated. B. All firestopping materials shall be free of asbestos, lead, PCB's, and other materials that would require hazardous waste removal. C. Firestopping shall be flexible to allow for normal penetrating item movement due to expansion and contraction. D. Firestopping systems for plumbing and wet pipe sprinkler piping shall be moisture resistant. E. Provide firestopping systems capable of supporting floor loads where systems are exposed to possible floor loading or traffic. F. Provide firestopping systems allowing continuous insulation for all insulated pipes. G. Provide firestopping systems classified by UL or listed by Intertek / Warnock Hersey for penetrations through all fire rated construction. Firestopping systems shall be selected from the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory Category XHEZ based on substrate construction and penetrating item size and material and shall fall within the range of numbers listed: 1. Combustible Framed Floors and Chase Walls - 1 or 2 Hour Rated: a. F Rating = Floor/Wall Rating b. L Rating = Penetrations in Smoke Barriers 1083 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 03 - 5 THROUGH PENETRATION FIRESTOPPING Penetrating Item UL System No. No Penetrating Item FC 0000-0999* Metallic Pipe or Conduit FC 1000-1999 Non-Metallic Pipe or Conduit FC 2000-2999 Electrical Cables FC 3000-3999 Cable Trays FC 4000-4999 Insulated Pipes FC 5000-5999 Bus Duct and Misc. Electrical FC 6000-6999 Duct without Damper and Misc. Mechanical FC 7000-7999 Multiple Penetrations FC 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. 2. Non-Combustible Framed Walls - 1 or 2 Hour Rated: a. F Rating = Wall Rating b. L Rating = Penetrations in Smoke Barriers Penetrating Item UL System No. No Penetrating Item WL 0000-0999* Metallic Pipe or Conduit WL 1000-1999 Non-Metallic Pipe or Conduit WL 2000-2999 Electrical Cables WL 3000-3999 Cable Trays WL 4000-4999 Insulated Pipes WL 5000-5999 Bus Duct and Misc. Electrical WL 6000-6999 Duct without Damper and Misc. Mechanical WL 7000-7999 Multiple Penetrations WL 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. 3. Concrete Floors and Walls - 1 or 2 Hour Rated: a. F Rating = Wall/Floor Rating b. L Rating = Penetrations in Smoke Barriers Penetrating Item UL System No. No Penetrating Item CAJ 0000-0999* Metallic Pipe or Conduit CAJ 1000-1999 Non-Metallic Pipe or Conduit CAJ 2000-2999 Electrical Cables CAJ 3000-3999 Cable Trays CAJ 4000-4999 Insulated Pipes CAJ 5000-5999 Bus Duct and Misc. Electrical CAJ 6000-6999 Duct without Damper and Misc. Mechanical CAJ 7000-7999 1084 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 03 - 6 THROUGH PENETRATION FIRESTOPPING Penetrating Item UL System No. Multiple Penetrations CAJ 8000-8999 *Alternate method of firestopping is patching opening to match original rated construction. H. Any opening in walls or floors not covered by the listed series of numbers shall be coordinated with the firestopping manufacturer. I. Any openings in floors or walls not described in the UL or listed by Intertek / Warnock Hersey Fire Resistance Directory, or outlined in manufacturer's information shall be sealed in a manner agreed upon by the Firestopping Manufacturer, Owner, and the Authority Having Jurisdiction. PART 3 - EXECUTION 3.1 EXAMINATION A. Ensure all surfaces that contact seal materials are free of dirt, dust, grease, oil, rust, or loose materials. Clean and repair surfaces as required. Remove laitance and form-release agents from concrete. B. Ensure substrate and penetrating items have been permanently installed prior to installing firestopping systems. Ensure penetrating items have been properly spaced and have proper clearance prior to installing firestopping systems. C. Surfaces to which sealing materials are to be installed must meet the selected UL or Intertek / Warnock Hersey system substrate criteria. D. Prime substrates where recommended in writing by through-penetration firestop system manufacturer. Confine primer to area of bond. 3.2 INSTALLATION A. In existing construction, provide firestopping of openings prior to and after installation of penetrating items. Remove any existing coatings on surfaces prior to firestopping installation. Temporary firestopping shall consist of packing openings with fire resistant mineral wool for the full thickness of substrate, or an alternate method approved by the Authority Having Jurisdiction. All openings shall be temporarily firestopped immediately upon their installation and shall remain so until the permanent UL or listed by Intertek / Warnock Hersey listed firestopping system is installed. B. Install penetration seal materials in accordance with printed instructions of the UL or Intertek / Warnock Hersey Fire Resistance Directory and with the manufacturer's printed application instructions. C. Install dams as required to properly contain firestopping materials within openings and as required to achieve required fire resistance rating. Remove combustible damming after appropriate curing. 1085 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 05 03 - 7 THROUGH PENETRATION FIRESTOPPING 3.3 CLEANING AND PROTECTING A. Clean excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not cause damage. B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements. END OF SECTION 28 05 03 1086 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 1 ELECTRONIC ACCESS CONTROL SECTION 28 13 00 ELECTRONIC ACCESS CONTROL PART 1 - GENERAL 1.1 SECTION INCLUDES A. Field Control Hardware B. Credentials and Badging C. Portal Devices D. Interfaces and Integrations 1.2 RELATED WORK A. Section 08 71 00 - Door Hardware B. Section 26 05 13 - Wire and Cable C. Section 26 05 33 - Conduits and Boxes D. Section 27 05 26 - Communications Bonding E. Section 27 05 28 - Interior Communication Pathways F. Section 27 05 53 - Identification and Administration G. Section 27 15 00 - Horizontal Cabling Requirements H. Section 28 05 00 - Basic Electronic Safety and Security System Requirements. I. Section 28 05 03 - Through Penetration Fire stopping. J. Section 28 16 00 - Intrusion Detection System K. Section 28 23 00 - Video Surveillance L. Section 28 31 00 - Fire Detection and Alarm Systems. 1.3 QUALITY ASSURANCE A. Manufacturer: The manufacturer shall have a minimum of ten (10) years documented experience in the development and manufacture of access control software and hardware. 1087 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 2 ELECTRONIC ACCESS CONTROL B. Contractor: 1. Shall be a factory-authorized installation, service and support company specializing in the selected manufacturer's product, with demonstrated prior experience of a minimum of one (1) year installing, programming and supporting the selected manufacturer's system. C. Material: 1. All material which is Contractor furnished shall be new, unused and free from defects. 2. Where more than one of any specified item of equipment or material is used, all such items shall be the same product from the same manufacturer. 1.4 REFERENCES A. International Building Code B. NFPA 70 - National Electrical Code. C. The BOCA National Building Code D. UL 294 - Standard for Access Control Systems. E. UL 1449 - Standard for Surge Protective Devices. 1.5 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 28 05 00. B. Product Data Submittal: Provide manufacturer's technical product specification sheet for each individual component type. Submitted data shall show the following: 1. Compliance with each requirement of these documents. The submittal shall acknowledge each requirement of this section, item-by-item. 2. All component options and accessories specific to this project. 3. Electrical power consumption rating and voltage. 4. Heat generation for all power consuming devices. 5. Wiring requirements. 6. Server processor(s), workstation configurations, total and available disk space, and memory size. 7. All network bandwidth, latency and reliability requirements. 8. Backup/archive system size and configuration. 9. Submit two of each type of credential to be used (access card, key fob, etc.). C. System Drawings: Project-specific system CAD drawings shall be provided as follows: 1088 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 3 ELECTRONIC ACCESS CONTROL 1. Provide a system block diagram noting system components and interconnection between components. The interconnection of components shall clearly indicate all wiring required in the system. When multiple pieces of equipment are required in the exact same configuration (e.g., multiple identical controllers), the diagram may show one device and refer to the others as "typical" of the device shown. The diagram shall list room numbers where each controller will be located. This block diagram shall be provided in Adobe PDF. 2. Provide a schedule of all controllers and the doors/points each controller controls. This schedule shall be provided in Adobe PDF. 3. Provide schedules describing each system input location by an architecturally familiar reference, e.g., Door 312A. The architectural door schedule shall be used as the basis. These schedules shall be provided in Adobe PDF D. Submit sample format of site specific programming guides to be used for system planning/programming conference with Owner. These guides shall be provided in Adobe PDF. E. So that required Owner personnel are present at the planning/programming conference required in Part 3 of this section, submit meeting agenda for the conference a minimum of two weeks prior to the conference. F. Submit detailed description of Owner training to be conducted at project end, including specific training times. Refer to Part 3 of this section for details. G. IP Addresses: Contractor shall provide to Owner, in a documented transmittal and in Microsoft Excel format, the names and locations of devices which require an IP address. An authorized representative of the Owner shall furnish the addresses for the associated devices in Microsoft Excel format in a documented transmittal. Should Owner change the IP address structure after approval of the list, Owner may be responsible for additional fees involved with reprogramming. H. Quality Assurance: 1. Provide materials documenting experience requirements of the manufacturer and Installing Contractor. Provide documentation of the training and other applicable certifications of the Contractor. 2. Provide system checkout test procedure to be performed at acceptance. Test procedures shall include all external alarm events. 1.6 SYSTEM DESCRIPTION A. This section describes the furnishing, installation, programming and commissioning of a complete, turnkey access control system. The terms "access control system" and "security management system", or SMS, may be used interchangeably herein. B. The company, manufacturer, and product names used in this section are for identification purposes only. All trademarks and registered trademarks are the property of their respective owners. 1089 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 4 ELECTRONIC ACCESS CONTROL C. Performance Statement: This section and the accompanying access control-specific design documents are performance based, describing the minimum material quality, required features, and operational requirements of the system. These documents do not convey every wire that must be installed and every equipment connection that must be made. Based on the equipment constraints described and the performance required of the system, as presented in these documents, the vendor and the Contractor are solely responsible for determining all wiring, programming, and miscellaneous equipment required. The Contractor shall be responsible for determining quantities of materials required for a complete and operational system. Floor plan drawings and schedules have been developed to aid the Contractor in determining device quantities and installation locations, but, where discrepancies between floor plans and schedules arise, the greater number shall govern. D. Basic System Description: 1. The access control system shall provide the following functionality: a. Electronic control access to designated areas. b. Validation of cardholder credentials by use of personnel database, card formats, PINs. The system shall compare the time, location, and unique credentials of an attempted entry with information stored in the database. c. Access to designated areas will be validated only when a user's credential has a valid number for its facility and the number is valid for the current time and for the reader where it is used. d. The system software shall access the hardware that validates the person and monitors the security of a building by use of intelligent system controllers, reader interfaces, locks, readers, inputs and outputs. When access has been validated, a signal to the portal locking device shall be activated to enable alarm free access at that location. e. The system shall be configured by use of application software. f. The system shall monitor activities using operator monitoring software which includes graphical maps which display alarms, status and activity. g. The system shall differentiate and restrict administrative and operational access through use of password authentication. h. The system shall report on various aspects of the system by use of reports, both default and customizable. Reports shall be able to be printed. i. The system shall have the capability to report alarms both audibly and visually. j. The system shall control hardware from the monitoring station by use of manual actions and events. k. The system shall provide record and data management by use of journals. There shall be a full audit trail. l. The system shall allow for data to be imported from other products by use of database migration tools. These products may include Human Resources databases for name and/or time and attendance information, information from previous access control systems consisting of badge numbers from credentials that will be re-used, Microsoft Excel spreadsheets, or other systems as defined herein. E. Integrations, Software Development Kit (SDK) and Application Programming Interface (API): 1090 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 5 ELECTRONIC ACCESS CONTROL 1. The manufacturers of the systems that are integrated shall make an SDK available to other manufacturers. 2. Prior to the release of this section, the manufacturers of the systems that are to be integrated shall have made available to each other all APIs to perform the specific integrated functions required in this section. 3. The integrations shall be completed and tested, and shall have been implemented on at least one system of similar size prior to the release of this section. The integrations shall not be accomplished for the first time for this project unless written pre-approval has been granted by Owner to Contractor prior to bid deadline. 4. During the warranty period, should a new API or version of software be released by the SMS manufacturer or any of the manufacturers of systems or devices that are integrated, that API or version of software shall be installed in the appropriate system or device defined in this section at no charge to Owner. Should any loss of functionality in the integration be exposed through this installation, as compared to the accepted system, Contractor shall correct the functionality at no charge to Owner. 5. Any and all development costs for specified functionality or inter-system integrations shall be included in the Contractor's bid. No additional costs or fees for the integrations shall be charged to Owner from the time of notice to proceed through system acceptance. 1.7 OWNER FURNISHED MATERIAL A. Telephone service B. Data circuit / internet service C. Active telephone service equipment, such as key system, PBX or VOIP switch equipment D. Active computer network equipment: 1. Routers 2. Switches 3. Hubs 4. Wireless access points 5. Uninterruptible power supplies for Owner furnished products E. Active computer equipment: 1. SMS server - refer to Part 2 for details 2. SMS workstation(s) - refer to Part 2 for details 3. SMS badging station(s) - refer to Part 2 for details 4. Uninterruptible power supplies for Owner furnished products F. Credentials: 1. Badges 2. Key fobs 3. Adhesive tags 1091 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 6 ELECTRONIC ACCESS CONTROL 4. Active transmitters 1.8 LICENSING REQUIREMENTS A. All user licenses required for system operation shall be included in the Contractor's bid. User licenses shall include server and workstation software, network controllers, card readers, printers, badging stations, and any other licensing that is required by the manufacturer for operation of any system component. 1. Licenses shall be provided on a one-to-one basis. One license shall be provided for each device requiring a license. In the event the manufacturer requires the purchase of a block of licenses, license blocks provided shall be no greater than what is required for the number of devices in this project. Contractor shall document the number of remaining licenses in the project record documents and Operations and Maintenance data. 2. In addition to the licensing requirements listed above, provide licensing and configuration of system administration/operation software for two (2) workstations. The workstation licenses shall be concurrent use seats, and the client software shall be able to be loaded on an unlimited number of workstations at no extra cost to the Owner. Contractor shall install client software on the same number of machines as licenses provided. As part of the training, Contractor shall demonstrate to Owner how to install client software on additional workstations. 3. The system described herein is an extension of an existing Paxton system. All licensing shall be new for each installed device. The Contractor shall not use any of the Owner's existing (spare) licenses for any new components. 4. All Contractor-furnished software shall contain a perpetual, permanent license in which no other fees beyond the single payment for the work of this section are required in order to use the proposed software indefinitely. Owner understands that, after the initial warranty period has expired, maintenance and technical support fees may be required annually, quarterly, or monthly in order to receive software updates and technical support. However, it remains the option of Owner to purchase or decline this service. If Owner chooses to discontinue or never purchase this service, the software shall continue to be legally licensed for use. All software shall be the latest version released, and all Contractor-furnished servers and workstations shall be current on all patches and updates for all software on the machines at the time of acceptance of the associated systems. 5. The SMS shall require only a single license key present on the server for the SMS to operate. The key shall be a physical device or a software key. License keys shall not be required at the client workstations. 1.9 PROJECT RECORD DOCUMENTS A. Submit documents under the provisions of Section 28 05 00. B. Provide final system block diagram showing any deviations from shop drawing submittal. C. Provide statement that system checkout test, as outlined in the shop drawing submittal, is complete and satisfactory. 1092 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 7 ELECTRONIC ACCESS CONTROL D. Provide schedules documenting: 1. Controller installation locations including specific door numbers being controlled. 2. All terminal block wiring, including cable numbers. E. Warranty: Submit written warranty and complete all Owner registration forms. F. Complete all operation and maintenance data manuals as described below. 1.10 OPERATION AND MAINTENANCE DATA A. Submit documents under the provisions of Section 28 05 00. B. Manuals: Final copies of the manuals shall be delivered within 30 days after completing the installation test. Each manual's contents shall be identified on the cover. The manual shall include names, addresses, and telephone numbers of the contractor responsible for the installation and maintenance of the system, and the factory representatives for each item of equipment for each system. The manuals shall have a table of contents and labeled sections. The final copies delivered after completion of the installation test shall include all modifications made during installation, checkout, and acceptance testing. Manuals shall be submitted in electronic format only, Adobe PDF. The manuals shall consist of the following: 1. Hardware Manual: The manual shall describe all equipment furnished including: a. General description and specifications. b. Installation and check out procedures. c. System and equipment layout and electrical schematics to the control board and field device level. For multiple devices wired identically, only one wiring diagram is required per door configuration, to be labeled "TYPICAL". d. Alignment and calibration procedures. e. Manufacturers repair parts list indicating sources of supply. 2. Software Manual: The software manual shall describe the functions of all software and shall include all other information necessary to enable proper loading, testing, and operation. The manual shall include: a. Definition of terms and functions. b. System use and application software. c. Initializations, startup, and shutdown procedures. d. Reports generation. e. Details on forms customization and field parameters. 3. Operator's Manual: The operator's manual shall fully explain all procedures and instructions for the operation of the system including: a. Computers and peripherals. b. Log in/Log out procedures. c. Use of system, command, and applications software. d. Recovery and restart procedures. e. Graphic alarm presentation. 1093 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 8 ELECTRONIC ACCESS CONTROL f. Use of report generator and generation of reports. g. Data entry. h. Operator commands. i. Alarm messages. j. System permissions functions and requirements. 4. Maintenance Manual: The maintenance manual shall include descriptions of maintenance for all equipment including inspection, cleaning, periodic preventive maintenance, fault diagnosis, and repair or replacement of defective components. 1.11 WARRANTY A. Unless otherwise noted, provide warranty for one (1) year after date of Notice of Completion for all materials and labor. B. Operation: Upon the completion of any scheduled adjustments or repairs, Contractor shall verify operation of the SMS. C. Service: The Owner will initiate service calls when the SMS is not functioning properly. If requested by the Owner, the Contractor shall respond or remain at the site after normal business hours, and the Owner shall reimburse the Contractor for the incremental cost difference between premium labor rates and standard labor rates. This reimbursement applies to premium labor rates that do not exceed time-and-one-half rates after normal business hours and double-time rates for Sundays and holidays. The Owner shall be furnished with telephone number(s) where service personnel can be reached 24/7/365. Qualified service personnel shall be at the site within twenty four (24) hours after receiving a request for service. D. Records, Logs and Work Requests: Contractor shall keep records and logs of each task completed under and outside of warranty. These logs shall be maintained in Microsoft Word or Excel. The log shall include the model and serial number identifying the component involved, its location, date and time the call was received, specific nature of trouble, names of service personnel assigned to the task, description of work performed, the amount and nature of the material used, and the time and date of commencement and completion of the work. Complete logs shall be kept and shall be available for review on site, demonstrating that planned and systematic adjustments and repairs have been accomplished for the SMS. The Contractor shall deliver a record of the work performed within three (3) business days after work is completed. Defective items that have been replaced shall be given to the Owner. Should the replacement item be a temporary replacement until the removed item is repaired, Contractor shall retain possession of the defective item for repair and subsequent re-installation. E. System Modifications: Modifications by the Contractor are allowed after system acceptance. Contractor shall make recommendations for system modification in writing to the Owner. No system modifications shall be made without prior, written approval of the Owner. Any modifications made to the system shall be incorporated into the Operations and Maintenance Manuals, and other documentation affected. The Owner shall be provided with electronic restorable versions of all configurations prior to the modifications being made. 1094 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 9 ELECTRONIC ACCESS CONTROL F. Software: At no charge, the Contractor shall provide to Owner all updates released by the manufacturer during the period of the warranty and verify operation of the system upon installation. These updates include system software updates, patches, bug fixes and revisions, as well as firmware updates. These updates shall be accomplished in a timely manner, fully coordinated with SMS administrators and operators, shall include training for the new changes/features, and shall be incorporated into the Operations and Maintenance Manuals and software documentation. G. Refer to the individual product sections for further warranty requirements of individual system components. PART 2 - PRODUCTS 2.1 ELECTRONIC ACCESS CONTROL SYSTEM MANUFACTURERS A. Paxton Net2 2.2 FIELD CONTROL HARDWARE A. Interior Control Panels: 1. Control boards, power distribution and terminals shall be enclosed in a NEMA 1 rated enclosure that is key lockable. Contractor shall not furnish padlock. All enclosures that are part of this project shall be keyed alike. Contractor shall furnish and install a mechanically fastened tamper switch on the interior of the enclosure. 2. Control boards are allowed to be in an enclosure separate from the power supplies/power distribution. Should they be in separate enclosures, the interface wiring shall be in rigid metallic conduit, RMC, with Myers hubs at both ends of the conduit. 3.Intra-enclosure wiring shall be dressed using tie wraps and/or covered plastic wire way. Hook-up wires for identical purposes shall have the same color insulation. For example, if one input pair utilizes green and white insulated conductors, all similar inputs shall use green and white insulated conductors. The same color scheme shall be followed for all access control panels that are part of this project. 4. Cabling from field devices such as readers, door position switches, request-to-exit devices and locking devices shall not be directly terminated to the control boards and power supplies. The field devices shall be terminated to terminals located on the left side, right side or both sides of the enclosure back panel. Intra-enclosure wiring shall be routed from the terminals to the control boards and power distribution. Quantity and functional sequence of the terminals shall be identical portal to portal. 5. All devices inside the enclosure, less cabling and batteries, shall be mechanically fastened to a removable solid or perforated metal back panel with either: a. Metal or plastic standoffs b. DIN rail 1095 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 10 ELECTRONIC ACCESS CONTROL 6. Hook and loop fasteners, double sided tape or adhesives are not allowed to attach devices to the back panel. Mounting devices to the interior of the door shall only be allowed when the following two (2) conditions are met: a. The access control hardware manufacturer offers prefabricated enclosures with devices mounted to the interior of the door. b. Only the same devices that the access control manufacturer mounts to the interior of the door are allowed to be mounted in a different enclosure, and those devices shall be mounted in an identical manner. 7. 120V 20A input power shall be hard wired to a circuit breaker disconnect and to one duplex receptacle on the interior of the enclosure. Should devices in the enclosures require plug-in transformers/power supplies, the receptacle shall be utilized. One (1) power strip with integrated circuit breaker shall be located in the bottom of the enclosure as needed. 8. Power to the locking devices shall be provided by a power distribution board with no fewer than four (4) outputs. Each lock shall be individually protected. The power distribution board shall: a. Provide protection with fuses or positive temperature coefficient (PTC) devices. b. Provide control so that each output is individually selectable as latching or non- latching with fire alarm activation. c. Provide control so that each output shall have Fail Safe and Fail Secure terminals. d. Provide a fire alarm input with associated trigger LED. e. Provide an individual LED per output to indicate when an input has been triggered and the associated output has been activated. f. Accept a dry, closed contact input to activate the individual lock outputs. g. Provide a dry, Form C relay that energizes on activation of the fire alarm input. This output may then be used as a fire alarm input to other power distribution boards in the same or a different enclosure, or may provide input to another device such as a multi-pole relay. 9. A minimum of four (4) 12V 7 AH rechargeable, sealed, lead acid batteries shall be located in the bottom of the enclosure. Two of the batteries shall be connected in series for 24V devices, and two batteries shall be connected in parallel for 12V devices. Contractor shall provide additional batteries as needed to power all devices for a minimum of twenty four (24) hours.Connections to the batteries shall be made with appropriate terminals crimped on the connecting conductors. Batteries shall be clearly labeled in a permanent manner with the date of installation. 10. Power to control boards, readers and auxiliary devices such as request-to-exit motion detectors shall be provided by a power distribution board with no fewer than four (4) outputs. All devices powered by the same voltage at an individual portal shall be protected by the same fuse or PTC unless current requirements dictate otherwise. Individual fuses or PTCs may protect more than one control board. 11. All access control panels, when populated with control boards and power supplies, shall have the following capacities: 1096 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 11 ELECTRONIC ACCESS CONTROL a. Control of a minimum of two (2) portals. b. Spare capacity of a minimum of one (1) access control portal, two (2) auxiliary inputs and two (2) auxiliary outputs greater than the requirements of the project at the time of system specification. c. Five (5) spare fuses of each type used, to be in their original packaging, to be located in each power supply enclosure. d. 50% spare current capacity on all power supplies located in unconditioned spaces and 40% spare capacity for those in conditioned spaces. Lower spare capacities are allowable based on prior approval of Contractor-provided power calculations. 12. Locations where enclosures may be mounted are shown on the plans. Final location, with approval of Owner's representative, shall be selected by Contractor based on distribution of controlled portals and devices. 13. At time of Substantial Completion, Contractor shall furnish a schematic diagram of intra-enclosure wiring and a complete bill of materials for the enclosures and the devices located within. This documentation shall include a schedule of fuses and the device(s) that each fuse protects. This documentation shall be placed by Contractor in a Contractor-furnished print pocket located on the inside of the enclosure door. B. Intelligent System Controllers (ISC): 1. The controller shall communicate with the host via an on board 10/100 Base T Ethernet port. 2.The controllers shall be a distributed architecture with full peer-to-peer networking capability. Parent/Child controller configurations are not acceptable. All controllers in the system shall be capable of operating in a standalone mode if communication is lost with the server or main controller. In no case shall a controller depend on communication with an upstream controller for proper standalone operation. 3. The communications bus shall be supervised for wiring integrity. If a communication failure is detected, the system shall report the loss. All controllers unable to receive communication shall operate as standalone devices including grant/deny decisions, complete with event buffers. All events shall be uploaded to the server upon restoration of communications. 4. The controllers shall utilize flash memory or similar technology, allowing program updates to be downloaded from the server. Program storage shall be in ROM. 5. The controllers shall have the capacity for 15,000 cardholders and 45,000 transactions. All access decisions involving these cardholders shall be made at the lowest controller level without communication to the server. 6. 32-bit microprocessor controlled. 7. Handle all non-host related access control monitoring and decision making. 8. LED indicators for power, fault and communications. 9. Provide for local and global input/output linking: a. The SMS shall support a global linkage feature whereby any input/output/event shall be linked to any other input/output/event in the SMS. Input/output linkages shall be able to span across intelligent system controllers. 1097 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 12 ELECTRONIC ACCESS CONTROL b. System administrators shall be able to create global input/output function lists, each consisting of a sequence of actions to be performed, such as changing card reader modes, activating outputs, and opening or closing anti-pass back areas. Each function list may include up to six actions. 10. Reporting of transactions and status information to the server. 11. Interface with standard reader technologies without special interface hardware, additional logic panels or other integrators. Supported technologies shall include: a. 13.56 MHz Contactless Smart with or without biometrics or keypad b. 13.56 MHz Multi-technology Smart c. Proximity, with or without keypad d. Magnetic stripe, with or without keypad e. Wiegand f. Bar code g. Keypad h. Biometric, with Wiegand output C. Reader Interface Module (RIM): 1. Reader interface modules are not shown on the plans. Refer to the installation section of this specification for allowable equipment mounting locations. It is the responsibility of the Contractor to determine the number and configuration of reader interface modules required based on the inherent characteristics of each product line and the requirements and restrictions described in this document. 2. RIM shall interface with and accept data from TTL, Wiegand and RS-485 type readers and door hardware. 3. RIM shall provide a minimum of three (3) inputs per portal for portal position, request to exit and auxiliary input. 4. RIM shall provide a minimum of two (2) outputs per portal for locking device and auxiliary output. Each output shall be Form C and shall be rated at 3A at 28VDC. 5. RIM shall communicate to controller by RS-485. D. Input Control Module (ICM): 1. The input control module shall provide supervised and non-supervised alarm input zones and monitor/report line fault conditions, alarm conditions, power faults and tampers. 2. Input control modules are not shown on the plans. Refer to the installation section of this specification for allowable equipment mounting locations. It is the responsibility of the Contractor to determine the number and configuration of input control modules required, based on the inherent characteristics of each product line and the requirements and restrictions described in this document. 3. UL 294 and 1076 listed. 4. Each input configurable for normally open or normally closed. 5. Each input configurable for timing. 6. Each input configurable for end of line resistance. 7. Status LEDs for communication to the host, heartbeat and input status. 8. Communications line supervision. 9. AES 128 bit encryption. 10. 2-wire RS485 communications. 1098 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 13 ELECTRONIC ACCESS CONTROL 11. No fewer than eight (8) inputs per board/control module. 12. Assignment of unit addresses and communications speed. 13. Alarm Masking: The ability to mask the alarm input on a time zone basis. 14. Activate Output: The ability for any input to activate any output. 15. Configuration of Debounce Time: The ability to control the amount of time that an input state change must remain consistent in order for it to be considered a real change of state. 16. Elevator control support for number of floors shown on the drawings. 17. Noise rejection filtering to prevent false alarms. 18. Global Linkage: The ability to link outputs with inputs that are attached to any ICM/output control module (OCM). 19. Checkpoint: The ability to configure an input as a designated stop on one or more guard tours. 20. Entry/Exit Delay: The ability to set up entry/exit delays for inputs that are attached to any ICM. This shall include: a. Non-Latched Entry: When an input activates, the alarm will not be reported until the entry delay expires. If the input is still active when the entry delay expires, the alarm will be reported. If the input is not active when the entry delay expires, then the alarm will not report. b. Latched Entry: When an input activates, the alarm will not be reported until the entry delay expires. If the input is still active when the entry delay expires and the alarm has not been masked, the alarm will be reported. If the input has been masked when the entry delay expires, then the alarm will not report. c. Exit Delay: When an input activates, the alarm will not be reported (operates as if masked) until the exit delay expires. If the input is still active when the exit delay expires, the alarm will be reported. If the input is not active when the exit delay expires, the alarm will not be reported. E. Output Control Module (OCM) and Functionality: 1. Output control modules are not shown on the plans. Refer to the installation section of this specification for allowable equipment mounting locations. It is the responsibility of the Contractor to determine the number and configuration of output control modules required, based on the inherent characteristics of each product line and the requirements and restrictions described in this document. 2. The output control module(s) shall provide Form C relay contacts for load switching, rated at 3A at 28VDC. 3. Each relay shall support "On" "Off" and "Pulse." 4. Outputs can be pulsed from 0.1 seconds to 24 hours. 5. Status LEDs for communication to the host, heartbeat and relay status. 6. 2-wire RS485 communications. 7. No fewer than eight (8) outputs per board/control module. 8. Communications line supervision. 2.3 CREDENTIALS AND BADGING A. Badging Station: 1. Provisioning: 1099 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 14 ELECTRONIC ACCESS CONTROL a. The workstation(s) shall be furnished by the Owner and shall meet the specifications defined by the SMS software manufacturer to meet or exceed the functionality and performance specifications of the system and integrations defined in this and related sections. Contractor shall furnish specifications to the Owner in writing as part of the submittals. 2. Software: a. Licensing 1) Required badging/credential management licensing shall be furnished. 2.4 PORTAL DEVICES A. Credential Readers: 1. Manufacturers: a. Honeywell OmniClass with integral keypad 2. Multi-Technology: a. Compatible with 125 kHz proximity, 13.56 MHz Contactless Smart card, MIFARE, DESFire EV1. b. Backwards compatibility with legacy 13.56 MHz Contactless Smart cards and 125 kHz proximity access control formats, including 26, 32, 35, 37 bit as well as HID Corporate 1000 format. 3. Card readers manufactured specifically for non-access control applications shall not be acceptable. 4. FIPS 201 compliant. 5. Provide compatibility with most access control systems by providing card data outputs in Wiegand and Clock/Data. 6. Allow the firmware to be updated in the field without the need to remove the reader from the wall. 7. Secure mounting methods using tamper resistant screws. 8. An audio beeper that provides various tones to signify access granted, access denied, power up and diagnostics. 9. Tri-color LED or three (3) LEDs for visual notification of various conditions. 10. ISO1443A, 1443B and 15693 compliant. 11. The ability to transmit an alarm from an integrated tamper switch. 12. Support dual authentication of identity through the combined use of access badge and personal identification number (PIN) on an integrated 12 key keypad. 13. PBT polymer or UL94 polycarbonate. 14. Read Range: a. Using 125 kHz cards or 13.56 MHz Contactless Smart cards, minimum operational read range shall not be less than one (1) inch after the readers have been installed in their permanent locations. 1100 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 15 ELECTRONIC ACCESS CONTROL 15. Operational voltage of 5-16 VDC, with operating temperature range of -31° F to 150° F, and rated for outdoor use with a minimum rating of IP55. 16. Readers and credentials shall be compatible with each other and shall be from the same manufacturer. 17. Available in sizes to be mounted to a standard single gang box or to a mullion. Maximum sizes: a. Single gang box mount, with or without keypad: 5.1" x 3.1" x 1.1" b. Mullion mount: 6.0" x 1.9" x 0.9" 18. Lifetime warranty against defects in material and workmanship. B. Door Position Switch: 1. Manufacturers: a. GE b. Honeywell c. Pre-approved equal 2. Interior or Perimeter Door: a. One (1) inch or 0.75 (3/4) inch diameter, recessed b. DPDT contacts c. 0.75" to 1.25" (3/4" to 1-1/4") gap for wood door d. Maximum 0.375" to 0.625" (3/8" to 5/8") gap for steel door e. Basis of Design: UTC/GE/Sentrol 1076D C. Cable: 1. Composite cable is allowed, although sufficient conductors may not be available in composite cables for all portal configurations. Contractor shall be responsible for additional required cables beyond one composite cable to each portal to meet functional requirements of the system. a. Reader: 22 AWG, 3 pair, stranded, overall shield. Shield shall be grounded at control panel end only. b. Request to Exit Motion Detector: 22 AWG, 4 conductor, stranded. c. Door Position Switch: 22 AWG, 2 conductor, stranded. d. Request to Exit Button: 18 AWG, 4 conductor, stranded. e. Lock: Minimum 18 AWG, 4 conductor, stranded. 1) Lock may require heavier gauge cable depending on door hardware solution power requirements. Contractor shall coordinate with door hardware provider for higher current devices and shall adjust the gauge of the lock cable accordingly. f. Auxiliary Devices: Refer to plans for requirements. D. Locks and Door Hardware: 1101 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 16 ELECTRONIC ACCESS CONTROL 1. Electric/electronic locks shall be furnished and installed by the door hardware provider. 2. Access Control Contractor shall interface with and terminate cables to locks. 3. Access Control Contractor shall coordinate with door hardware provider for specified sequences of operation at the various portals. 4. Magnetic locks shall have a magnetic bond sensor. 5. Refer to architectural specifications and/or the architectural door schedule. 2.5 INTERFACES AND INTEGRATIONS A. Elevator Interface 1. The SMS shall provide a relay based interface to the elevator system consisting of: a. The credential reader shall be located on the outside of the cab. The car call button shall not be operational until a valid credential is presented to the reader. After valid credential presentation, the car call button shall be functional for a period of time programmed in the SMS. This functionality does not prevent tailgating. PART 3 - EXECUTION 3.1 INSTALLATION A. Comply with the manufacturer's instructions and recommendations for installation of all products. B. Provide all system wiring between all components as shown on the project drawings or as directed by the manufacturer, whichever is the more stringent requirement. C. Network controllers shall be installed centralized in the nearest telecommunications room(s). Mount controllers to the structural walls in a location coordinated with other utilities. Coordinate exact location with Architect/Engineer prior to installation. Provide dedicated +120 VAC power circuit to the controllers using #12 AWG wiring from the nearest electrical power distribution panel board. D. Provide wiring and connection to all electrified locking hardware devices. Complete programming and testing of all electrified locking hardware devices. E. Install all credential readers in accordance with manufacturer's instructions where shown on floor plans, in accordance with the Americans with Disabilities Act (ADA) requirements. Provide wiring and connection to all credential readers. Complete programming, adjustment, and testing of all credential readers. F. Provide wiring and connection to all hardware request-to-exit devices that are integral to electrified door hardware. Provide wiring and connection to all request-to-exit motion detectors. Complete programming and testing of all integrated request-to-exit devices. Where possible, avoid false activation by persons passing by but not exiting. 1102 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 17 ELECTRONIC ACCESS CONTROL G. Install all door alarm contacts in accordance with manufacturer's instructions either recessed in the door header or surface mounted as required. Provide wiring and connection to door alarm contact devices. Complete programming, adjustment and testing of all door alarm contacts. H. Install, wire, configure, adjust, program and test all access control system servers, workstations, badging workstations and other user interfaces. I. Install, wire, configure, adjust, program, and test all specified interfaces and integrations between access control and other systems. Contractor shall provide all cabling, wiring, terminations, components, devices, accessories, hardware, software and other material and accessories necessary to complete all specified interfaces and integrations and make them fully operational. J. All low voltage access control cabling shall be installed in conduit from end to end. K. Electronic access control system cabling shall not be spliced. L. Flexible conduit is not allowed except with prior approval. Refer to Section 26 05 33 for conduit requirements. Refer to Section 27 05 28 for cable hanger and support requirements. M. Each cable shall be appropriately identified, as defined on the record documents, at each end's termination point using pressure sensitive label strips. N. The conductor color code used in terminating system cabling at system devices shall remain consistent from device to device for each unique device type throughout the project. O.Install and tighten all connectors in accordance with manufacturer's instructions using the appropriately designed tools recommended by the manufacturer for that purpose. Do not strip or damage connectors, terminals, or equipment by over tightening termination fasteners. P. Grounding and Bonding Requirements: 1. Provide a minimum of 6AWG bonding conductor from each electronic access control system control panel, power supply and surge suppression device to the nearest telecommunications grounding busbar. Actual bonding conductor size is determined by its length; refer to Section 27 05 26 for grounding and bonding conductor sizing criteria. 2. Cables containing shields shall not have the shields grounded at conduits, boxes, racks, etc. Ground the shield only at the control panel end. Q. Coordinate installation of all devices with other trades and utilities in the vicinity. R. Cabling shall be plenum rated when installed outside conduit in plenum ceilings. 1103 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 18 ELECTRONIC ACCESS CONTROL 3.2 FIELD QUALITY CONTROL A. Where these specifications require a product or assembly without the use of a brand or trade name, provide a product that meets the requirements of the specifications as supplied and warranted by the system vendor. If the product or assembly is not available from the system vendor, provide product or assembly as recommended by the system vendor. B. Periodic observations will be performed during construction to verify compliance with the requirements of the specifications. These services do not relieve the Contractor of responsibility for compliance with the contract documents. C. Furnish products listed and classified by Underwriters Laboratories, Inc. (UL) as suitable for purpose specified and indicated. 3.3 MANUFACTURER AND INTEGRATOR COMBINED FIELD SERVICES A. Installation shall be performed by a factory-trained and certified Contractor. B. The Contractor shall provide a comprehensive, site-specific customer planning guide for the system. The Contractor shall conduct conference(s) with the Owner prior to any installation to discuss the programming and configuration options of the system and the planning guide. C. The Contractor shall include labor for all planning and all programming activities required to implement the Owner's access policies for each system point and each operator and administrator. Any software programmable access policy, within the bounds of the hardware specified, shall be included. D. It shall be the responsibility of the Contractor to provide a complete, functional system as described by the design documents. These responsibilities include: 1. Complete hardware setup, installation, wiring and software configuration of the system server, all workstations and all peripheral hardware. 2. Complete programming of all operator software in accordance with the Owner's access policies determined by the planning guide conference(s). 3. Configuration of the network software for operation of the system. Templates shall be established representative of all user access right levels. 4. Complete system diagnostic verification. E. The SMS Installation Contractor shall be present at meetings to coordinate all door hardware requirements with the door hardware vendor. 3.4 SYSTEM DOCUMENTATION A. Complete documentation shall be provided for the system. The documentation shall describe: 1. All operational parameters of the system 2. Complete documentation of programming and access policies 3. Complete operating instructions for all hardware and software 1104 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 19 ELECTRONIC ACCESS CONTROL B. The following sections shall be provided in the system documentation: 1. System Administrator Manual: Provides an overview and a step-by-step guide and instructions detailing all system administrator responsibilities and functions. 2. User Manual: A step-by-step guide and instructions detailing all system user functions. 3. Alarm Monitoring Manual: A step-by-step guide and instructions detailing all alarm monitoring system functions and responsibilities. 4. Technical Maintenance Manual: A comprehensive document providing all maintenance actions, system testing schedules, troubleshooting flowcharts, functional system layout, wiring diagrams, block diagrams and schematic diagrams. 5. Refer to Part 1 for details. 3.5 SYSTEM TRAINING A. All labor and materials required for on-site system training by a certified representative of the system manufacturer shall be provided. Training shall be conducted at the project site using the project equipment. B. Coordinate training days and times with Owner. C. Provide a training outline agenda describing the subject matter and the recommended audience for each topic. D. At a minimum, the following training shall be conducted: 1. System Administrators: A course detailing the system functions, configurations and operations. Provide training on all aspects of the system including data import/export, report, cardholder management, system workstation and server configuration and maintenance, software and hardware configuration and peripheral hardware operation. 2. Operators: A course detailing the operational features of all aspects of the user interface. Topics shall include alarm monitoring functions, reports, error handling, alarm handling, output relay control, operation of integrated systems interface, and general overview of the report hardware. E. Minimum on-site training times shall be: 1. System Administrators:Two (2) hours. 2. Operators:Two (2) hours. 3.6 SYSTEM ACCEPTANCE A. The SMS vendor shall submit for review a formal acceptance and system checkout program. The system checkout procedures shall include all system components, software and functionality. The Contractor shall perform the tests and document all results under the supervision of the manufacturer's systems engineer. 1105 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 13 00 - 20 ELECTRONIC ACCESS CONTROL B. All operational scenarios, as defined by the customer planning guide, shall be tested to simulate the actual use of the system in the normal operating environment. The successful completion of these operational scenarios shall be documented. C. The system shall not be accepted until all requirements of system documentation and training have been completed. END OF SECTION 28 13 00 1106 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 16 00 - 1 INTRUSION DETECTION SYSTEM SECTION 28 16 00 INTRUSION DETECTION SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Security Control Panel. B. Initiation Devices. 1.2 RELATED WORK A. Section 26 05 33 - Conduit and Boxes B. Section 26 05 13 - Wire and Cable C. Section 28 05 00 - Basic Electronic Safety and Security System Requirements D. Section 28 31 00 - Fire Detection and Alarm Systems E. Section 28 23 00 - Video Surveillance 1.3 QUALITY ASSURANCE A. Manufacturer: The access control system shall be a single-source manufacturer such that the single vendor distributes, supports, warranties and services all components. The manufacturer shall have a minimum of five (5) years documented experience. B. Installer: The installing dealer must be a factory-authorized service and support company specializing in the selected manufacturer's product, with demonstrated prior experience with the selected manufacturer's system installation and programming. C. Servicing Contractor: The manufacturer of the system must have local service representatives within 60 miles of the project site. 1.4 REFERENCES A. NFPA 70 - National Electrical Code. B. UL 294 - Standard for Access Control Systems. 1.5 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 28 05 00. B. Product Data Submittal: Provide manufacturer's technical product specification sheet for each individual component type. Submitted data shall show the following: 1107 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 16 00 - 2 INTRUSION DETECTION SYSTEM 1. Compliance with each requirement of these documents. The submittal shall acknowledge each requirement of this section, item-by-item. 2. All component options and accessories specific to this project. 3. Electrical power consumption rating and voltage. 4. Wiring requirements. C. System Drawings: Project-specific system CAD drawings shall be provided as follows: 1. Provide a system block diagram noting system components and interconnection between components. The interconnection of components shall clearly indicate all wiring required in the system. When multiple pieces of equipment are required in the exact same configuration (i.e., multiple identical controllers), the diagram may show one device and refer to the others as "typical" of the device shown. 2. Provide schedules describing each system input location by an architecturally familiar reference (i.e., Door 312A). The architectural door schedule shall be used as the basis. D. Submit detailed description of Owner training to be conducted at project end, including specific training times. E. Quality Assurance: 1. Provide materials documenting experience requirements of the manufacturer and Installing Contractor. 2. Provide system checkout test procedure to be performed at acceptance. Test procedures shall include all external alarm events. F. Coordination Drawings: 1. Include all ceiling-mounted devices in composite electronic coordination files. Refer to Section 28 05 00 for coordination drawing requirements. 1.6 SYSTEM DESCRIPTION A. This specification section describes the furnishing, installation, commissioning and programming of a complete, turnkey security management system. B. Performance Statement: This specification section and the accompanying access control- specific design documents are performance based, describing the minimum material quality, required features, and operational requirements of the system. These documents do not convey every wire that must be installed and every equipment connection that must be made. Based on the equipment constraints described and the performance required of the system, as presented in these documents, the Vendor and the Contractor are solely responsible for determining all wiring, programming and miscellaneous equipment required for a complete and operational system. C. Basic System Description: The security management system shall provide an integrated hardware and software solution for access control. 1108 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 16 00 - 3 INTRUSION DETECTION SYSTEM 1.7 PROJECT RECORD DOCUMENTS A. Submit documents under the provisions of Section 28 05 00. B. Provide final system block diagram showing any deviations from shop drawing submittal. C. Provide statement that system checkout test, as outlined in the shop drawing submittal, is complete and satisfactory. D. Provide schedules documenting: 1. Controller installation locations including specific door numbers being controlled. 2. All terminal block wiring, including cable numbers. E. Warranty: Submit written warranty and complete all Owner registration forms. F. Complete all operation and maintenance manuals as described below. 1.8 OPERATION AND MAINTENANCE DATA A. Submit documents under the provisions of Section 28 05 00. B. Operation Data: Provide full system operation instructions for each piece of equipment. C. Maintenance Data: Document any manufacturer's recommended preventative maintenance procedures to be performed by the Owner. 1.9 WARRANTY A. Unless otherwise noted, provide warranty for one (1) year after Date of Notice of Completion for all materials and labor. B. The warranty shall include emergency service and repair on-site, with acknowledgment response time of one (1) hour from time of notification and on-site response within four (4) hours. The system shall be repaired and restored to operation within twenty-four (24) hours of notification. C. Refer to the individual product sections for further warranty requirements of individual system components. PART 2 - PRODUCTS 2.1 SECURITY CONTROL PANEL A.Control Panel: Modular construction with surface wall-mounted enclosure. B. Power Supply: Adequate to serve control panel modules ,remote detectors, remote annunciators and alarm signaling devices. 1109 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 16 00 - 4 INTRUSION DETECTION SYSTEM 1. Include battery operated emergency power supply with capacity for operating system in standby mode for 24 hours. C. System Supervision: Provide electrically-supervised system, with supervised alarm initiating and alarm signaling circuits. Component or power supply failure places system in alarm mode. D. Initiating Circuits: Supervised zone module with alarm and trouble indication. E. Remote Station Signal Transmitter: Electrically supervised, capable of transmitting alarm and trouble signals over telephone lines to central station receiver. F. Alarm Sequence of Operation: Actuation of Intrusion Detecting device places system in alarm mode, which causes the following operations: 1. Sound and display local alarm signaling devices with non-coded signal. 2. Transmit zone-coded signal to central station. 3. Indicate location of actuated device on control panel and on remote annunciator panel. 4. Alarm Reset: Key-accessible reset function resets alarm system out of alarm if alarm initiating circuits have cleared. 2.2 INITIATION DEVICES A. Door Contacts: 1. Contacts shall be single-pole, double-throw (SPDT) suitable for use in a line supervision circuit. Gap length shall be 1" on the latch side. 2. Provide magnetic alarm contacts at each door (recessed in the door header) where shown on the plans. Contacts shall provide a signal to the controller when the contact status changes. 3. The contacts shall have the capability of being shunted by a request-to-exit device. When the system grants access at a controlled point, the system shall shunt the door alarm input for that point. B. Motion Detectors: 1. Passive infrared, ceiling mounted, 12 VDC. 2. Adaptive technology for humidity and temperature stability. 3. 360-degree coverage, 60' coverage range. 4. Fresnel pattern lens with a minimum of a 30-zone pattern. C. Glass Break Detectors: 1. Shock sensor type, mounted to glass. 2. 10' protection range on single-pane glass. 3. Piezo transducer technology providing power to sensor. No external power is required. 4. +15 VDC maximum input. 1110 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 16 00 - 5 INTRUSION DETECTION SYSTEM PART 3 - EXECUTION 3.1 INSTALLATION A. Comply with the manufacturer's instructions and recommendations for installation of all products. B. Provide all system wiring between all components as directed by the manufacturer. C. Mount all readers where shown on plans in accordance with Americans with Disabilities Act (ADA) requirements. D. Locate all request to exit motion detectors directly above the door frame, centered on the door opening. Adjust sensitivity to permit operation on motion of persons within 2'-0" of door. Avoid false activation by persons passing by where possible. E. Provide wiring to the request-to-exit devices located in the electrified door hardware. F. Install, terminate and test all door alarm contacts. Contacts shall be recessed in the door header. 3.2 FIELD QUALITY CONTROL A. Where these specifications require a product or assembly without the use of a brand or trade name, provide a product that meets the requirements of the specifications, as supplied and warranted by the system vendor. If the product or assembly is not available from the system vendor, provide product or assembly as recommended by the system vendor. B. Periodic observations will be performed during construction to verify compliance with the requirements of the specifications. These services do not relieve the Contractor of responsibility for compliance with the Contract Documents. 3.3 MANUFACTURER'S FIELD SERVICES A. Installation shall be performed by a factory-trained and certified Contractor Installer. B. It shall be the responsibility of the Contractor/Installer to provide a complete, functional system as described by the Contract Documents. These responsibilities include: 1. Complete hardware setup, installation and wiring, and software configuration of the system. 2. Complete system diagnostic verification. 1111 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 16 00 - 6 INTRUSION DETECTION SYSTEM 3.4 SYSTEM ACCEPTANCE A. The SMS Vendor shall submit for review a formal acceptance and system checkout program. The system checkout procedures shall include all system components and software, including but not limited to all system computers, field controllers, card reader devices, biometric readers and remote system interfaces. The Contractor shall perform the tests and document all results under the supervision of the manufacturer's system engineer. B. All operational scenarios, as defined by the customer planning guide, shall be tested to simulate the actual use of the system in the normal operating environment. The successful completion of these operational scenarios shall be documented. 3.5 SYSTEM DOCUMENTATION A. Complete documentation shall be provided for the system. The documentation shall describe: 1. All operational parameters of the system. 2. Complete documentation of programming and access policies. 3. All data sets. 4. Complete operating instructions for all hardware and software. B. The following sections shall be provided in the system documentation: 1. User Manual: A step-by-step guide and instructions detailing all system user functions. 2. Technical Maintenance Manual: A comprehensive document providing all maintenance actions, system testing schedules, troubleshooting flowcharts, functional system layout, wiring diagrams, block diagrams and schematic diagrams. 3.6 SYSTEM TRAINING A. All labor and materials required for on-site system training by a certified representative of the system manufacturer shall be provided. Training shall be conducted at the project site using the project equipment. B. Provide two weeks advanced notice of training to the Owner. C. Provide a training outline agenda describing the subject matter and the recommended audience for each topic. D. At a minimum, the following training shall be conducted: 1. Alarm Monitoring Users: Provide a detailed course outlining the operational features of all aspects of the user interface. Topics shall include alarm monitoring functions, reports, error handling, alarm handling, output relay control and general overview of the report hardware. E. Minimum on-site training times shall be: 1112 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 16 00 - 7 INTRUSION DETECTION SYSTEM 1. Alarm Monitoring Users: One day. END OF SECTION 28 16 00 1113 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 1 VIDEO SURVEILLANCE SECTION 28 23 00 VIDEO SURVEILLANCE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Network Video Management System (NVMS). B. Video Printer. C. Equipment Racks. D. Cabling. 1.2 RELATED WORK A. Section 26 05 33 - Conduit and Boxes B. Section 26 05 13 - Wire and Cable C. Section 27 15 00 - Horizontal Cabling Requirements D. Section 28 05 00 - Basic Electronic Safety and Security System Requirements E. Section 28 31 00 - Fire Detection and Alarm Systems F. Section 28 13 00 - Electronic Access Control 1.3 QUALITY ASSURANCE A. NVMS Software Developer (Manufacturer): The NVMS system shall be a single-source manufacturer such that the single manufacturer develops, supports, and warranties the NVMS software solution. The manufacturer shall have three (3) years documented experience. 1. The software developer shall be an active ONVIF member with current available product recognized by ONVIF as a Conformant Product. B. Integrator/Installer (Contractor): The Contractor must be a NVMS-certified installation, service, and support company specializing in the selected manufacturer's product, with demonstrated prior experience with the selected manufacturer's system installation and programming. 1. The installer shall have in-house a Microsoft MCSE or equivalent technician for the purposes of server deployment, software configuration, and system integration. 2. The integrator must have local service representatives within 100 miles of the project site. 1114 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 2 VIDEO SURVEILLANCE 1.4 REFERENCES A. NFPA 70 - National Electrical Code B. Electronic Industries Association (EIA) Video Surveillance Equipment Standards C. UL 2044 - Standard for Commercial Closed Circuit Television Equipment D. UL 3044 - Standard for Safety for Surveillance Closed Circuit Television Equipment 1.5 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 28 05 00. B. Product Data Submittal: Provide manufacturer's technical product specification sheet for each individual component type. Submitted data shall show the following: 1. Compliance with each requirement of these documents. 2. All component options and accessories specific to this project. 3. Electrical power consumption rating and voltage. 4. Heat generation for all power consuming devices. 5. All required wiring shall be identified. 6. Number of IP addresses that will be required from the Owner's Information Systems Department. 7. Statement of Acceptability of Designed Server: a. If the Contractor agrees that the server(s) designed and described herein is acceptable for the chosen manufacturer's solution and meets the demand of the application, this shall be stated in writing and submitted as part of the shop drawing submittal. b. If the Contractor does not agree that the server(s) designed and described herein is acceptable for the chosen manufacturer's solution, Contractor shall itemize the quantity, technical specifications, and capacities of the servers required to support the functionality and device quantities required by the project drawings. Indicate the capacity utilization factor for each server. c. Contractor's bid shall include any required changes in server(s) capacity. 8. Calculation for storage required based on city's one year retention. 9. Calculation for required network bandwidth, including any latency restrictions. 10. Provide annual cost and all terms and conditions for the NVMS Software Maintenance Agreement. Include all additional costs and terms and conditions for any Annual Service Contracts provided by the Contractor for all services that are not included in the Software Maintenance Agreement. C. System Drawings: Project-specific system CAD drawings shall be provided as follows: 1. Provide a system block diagram noting system components and interconnection between components. The interconnection of components shall clearly indicate all wiring required in the system. When multiple pieces of equipment are required in the exact same configuration (e.g., multiple identical cameras), the diagram may show one device and refer to the others as "typical" of the device shown. 1115 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 3 VIDEO SURVEILLANCE D. Sample format of site specific programming guides to be used for system planning/programming conference with Owner. E. Meeting agenda for planning/programming conference required in Part 3 of this specification. F. Submit detailed description of Owner training to be conducted at project end, including specific training time. G. Quality Assurance: 1. Provide materials documenting experience requirements of the manufacturer and installing contractor. 2. Provide system checkout test procedure to be performed at acceptance. Test procedures shall include all external alarm events. H. Coordination Drawings: 1. Include all ceiling-mounted devices in composite electronic coordination files. Refer to Section 28 05 00 for coordination drawing requirements. 1.6 SYSTEM DESCRIPTION A. This specification section describes the furnishing, installation, commissioning and programming of a complete, turnkey, video surveillance system. B. Performance Statement: This specification section and the accompanying project drawings are performance based, describing the minimum material quality, required features, and operational requirements of the system. These documents do not convey every wire that must be installed and every equipment connection that must be made. Based on the equipment constraints described and the performance required of the system as presented in these documents, the vendor and the Contractor are solely responsible for determining all wiring, programming and miscellaneous equipment required for a complete and operational system. C. Refer to the project drawings for model numbers for the Basis of Design for all equipment. 1.7 LICENSING REQUIREMENTS A. All licenses required for system operation shall be included in the Contractor's bid. Licenses shall include, but not be limited to, server and workstation software, cameras, encoders/decoders, and any other licensing that is required by the manufacturer for operation of any system component. 1. Camera licenses shall be provided for all cameras listed on the Camera Schedule whether cameras are new or existing. 1116 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 4 VIDEO SURVEILLANCE 2. The system shall be provided with installed software capacity to accommodate a minimum quantity of fifty (50) cameras. The licensing for all fifty (50) cameras shall NOT be included in the Contractor's bid. Licensing shall only be included for the quantity of cameras shown on the Camera Schedule. However, the system's ability to support up to a total capacity of fifty (50) cameras shall ONLY require future payment of additional per-unit camera licensing fees by the Owner. In no case shall the Owner be required to upgrade the software provided in the Contractor's bid to achieve support for a total of fifty (50) cameras, including the payment of any software upgrade fees, installing a different software version, etc. 3. If the manufacturer requires the purchase of a block of licenses (instead of selling a single license for a single device) the Contractor's bid shall include the appropriate block of licenses that accommodates all device quantities described by the project drawings, plus two (2) additional devices for future growth. 4. Camera licensing that is restricted to a particular device MAC address or in any way is only valid for a particular manufacturer or model number is not acceptable. Camera licenses shall be issued such that the Owner can replace a camera with another camera brand and/or model number and transfer the license from the old camera to the new camera at no additional cost at any future time. This license transfer procedure shall be capable of being performed by the Owner and shall not require the services of an integrator. a. Exception: When a camera license is issued as a no-cost license in the limited condition that the NVMS manufacturer and the camera manufacturer are the same company, it is permissible to charge a future license fee to the Owner if the Owner elects to replace the NVMS manufacturer-branded camera with a third-party manufacturer's camera. 5. The Contractor shall fill out the NVMS Bid Inventory Form located herein and provide at the time of bid. 1.8 PROJECT RECORD DOCUMENTS A. Submit documents under the provisions of Section 28 05 00. B. Provide final system block diagram showing any deviations from shop drawing submittal. C. Provide statement that system checkout test, as outlined in shop drawing submittal, is complete and satisfactory. D. Provide final camera type and camera requirements schedules documenting all changes made during construction. E. Warranty: Submit written warranty and complete all Owner registration forms. F. Complete all operation and maintenance manuals as described below. 1.9 OPERATION AND MAINTENANCE DATA A. Submit documents under the provisions of Section 28 05 00. 1117 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 5 VIDEO SURVEILLANCE B. Manuals: Final copies of the manuals shall be delivered within thirty (30) days after completing the installation test. Each manual's contents shall be identified on the cover. The manual shall include names, addresses, and telephone numbers of the contractor responsible for the installation and maintenance of the system and the manufacturer for each piece of equipment for each system. The manuals shall have a table of contents and labeled sections. The final copies delivered after completion of the installation test shall include all modifications made during installation, checkout, and acceptance testing. The manuals shall consist of the following: 1. Hardware Manual: The manual shall describe all equipment furnished including: a. General description and specifications. b. Installation and check out procedures. c. System layout drawings and schematics. d. Alignment and calibration procedures. 2. Software Manual: The software manual shall describe the functions of all software and shall include all other information necessary to enable proper installation, testing, and operation. The manual shall include: a. Definition of terms and functions. b. System use and application software. c. Graphical user interface use. d. Reports generation. 3. Operator's Manual: The operator's manual shall fully explain all procedures and instructions for the operation of the system including: a. Computers and peripherals. b. System startup and shutdown procedures. c. Use of system. d. Recovery and restart procedures. e. Use of report generator and generation of reports. f. Data entry. g. Operator commands. h. Alarm messages. i. System permissions functions and requirements. 4. Maintenance Manual: The maintenance manual shall include descriptions of maintenance for all equipment including inspection, periodic preventive maintenance, fault diagnosis, and repair or replacement of defective components. 1.10 WARRANTY A. Unless otherwise noted, provide warranty for one (1) year after Date of Notice of Completion for all materials and labor. B. Onsite Work During Warranty Period: This work shall be included in the Contractor's bid and performed during regular working hours, Monday through Friday. 1. Inspections: Perform one minor inspection six-months after Substantial Completion and one major inspection prior to the expiration of the warranty. 1118 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 6 VIDEO SURVEILLANCE 2. Minor Inspections: Inspections shall include: a. Visual checks and operational tests of all equipment, field hardware, and electrical and mechanical controls. b. Mechanical adjustments if required on any mechanical or electromechanical devices. c. Install all available software updates, patches, or bug fixes available from the NVMS manufacturer. 3. Major Inspections: Inspections shall include all work described under paragraph Minor Inspections and the following work: a. Clean all equipment, including interior and exterior surfaces. b. Perform diagnostics on all equipment, including all system software diagnostics, and correct all diagnosed problems. c. Adjust all camera alignments that have become out of alignment from their documented position at Substantial Completion. d. Install all available software updates, patches, or bug fixes available from the NVMS manufacturer. e. All warrantable system deficiencies during the Major Inspection shall be remedied under warranty at no cost to the Owner. C. Operation: Upon the performance of any scheduled adjustments or repairs, verify operation of the NVMS system. D. Emergency Service: The Owner will initiate service calls when the NVMS system is not functioning properly. Qualified personnel shall be available to provide service within the distance defined above. The Owner shall be furnished with telephone number(s) where service personnel can be reached 24/7/365. E. Records and Logs: Keep records and logs of each task completed under warranty. The log shall contain all initial settings upon Substantial Completion. Complete logs shall be kept and shall be available for review on site, demonstrating that planned and systematic adjustments and repairs have been accomplished for the NVMS system. F. Work Requests: Record each service call request on a service request form. The form shall include the model and serial number identifying the component involved, its location, date and time the call was received, specific nature of trouble, names of service personnel assigned to the task, instructions describing what must be done, the amount and nature of the materials used, the time and date work started, and the time and date of completion. Deliver a record of the work performed within five (5) days after work is accomplished. G. System Modifications: Make any recommendations for system modification in writing to the Owner. No system modifications shall be made without prior approval of the Owner. Any modifications made to the system shall be incorporated into the operations and maintenance manuals, and other documentation affected. To the fullest extent possible, the Owner shall be provided with electronic restorable versions of all configurations prior to the modifications being made. 1119 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 7 VIDEO SURVEILLANCE H. Software: Provide all software updates during the period of the warranty and verify operation in the system. These updates shall be accomplished in a timely manner, fully coordinated with NVMS system operators, shall include training for the new changes/features enabled, and shall be incorporated into the operations and maintenance manuals, and software documentation. I. Refer to the individual product sections for further warranty requirements of individual system components. PART 2 - PRODUCTS 2.1 NETWORK VIDEO MANAGEMENT SYSTEM - GENERAL REQUIREMENTS A. The network video management system (NVMS) shall be an enterprise-class client/server based video security solution that provides management of digital video, audio and data across a TCP/IP network. B. The VMS shall utilize network switch ports provided by the Owner for all required IP connections. Provide the Owner with a complete list of all IP ports required. C. ONVIF Compliance: 1. The NVMS system shall be ONVIF certified as an ONVIF Network Video Client. 2. Cameras shall be ONVIF certified as an ONVIF Network Transmitter unless specifically noted as an exception to this requirement in the project drawings. D. The NVMS system shall be an "open system." 1. To meet this requirement, the NVMS must directly support cameras from a minimum of three (3) readily available camera manufacturers. 2. The three (3) camera manufacturers must have no corporate relationship to the NVMS manufacturer. 3. "Directly support" shall be defined as plug-n-play using drivers that are commercially available at the time of bid that utilize the ONVIF specification as the means of integration. 4. In addition to the requirement to support three (3) independent manufacturer's cameras, the NVMS may support an unlimited additional quantity of in-house or other proprietary cameras. 5. The open system shall not require proprietary storage solutions. It shall support third party storage solutions, including: a. Commercially available Direct Attached Storage (DAS) devices. b. Network Attached Storage (NAS) devices. c. Storage Area Networks (SAN) for primary or archival storage purposes. Primary support for SAN shall be defined as: 1) The ability to directly record to SAN device without first recording to an NAS or DAS. 2) The NVMS is provided with a user experience that makes the video recorded to the SAN transparent to the user. This shall be defined as: 1120 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 8 VIDEO SURVEILLANCE a) Full search, bookmarking, and other software features for finding, marking, locating, and identifying video are supported by the NVMS for video recorded to a SAN in an identical way to video that is recorded to an NAS or DAS. b) No loading of the video from the SAN into the NVMS shall be required. c) Full playback, windowing of camera video, archiving, and exporting is supported by the NVMS for video recorded to the SAN in an identical way as video recorded to an NAS or DAS. 6. The system must have a published API/SDK permitting third party integrations to the product without restrictions. 7. The NVMS shall support active directory using LDAP protocol. E. The NVMS system shall consist of the following hardware/software components: 1. Software: a. Server and client b. Recording services, archival services, and storage management c. Configuration tools 2. System storage as specified on the project drawings. 3. Cameras and related hardware as specified on the project drawings. 4. Hardware: Servers, workstations, and miscellaneous hardware (keyboard, mouse, KVM) as specified on the projects drawings. 5. Network electronics and related hardware and software as specified on the project drawings. F. Video from any camera on the system (on the LAN, WAN or Internet) shall be capable of being viewed from single or multiple workstations simultaneously at any time, limited only by network bandwidth. G. The NVMS shall support simultaneous displaying of live (30 fps) video of a minimum of 16 cameras while the video monitoring screen is configured in a 16-camera split configuration. In no case shall the frame rate of the camera be required to be restricted to less than 30 fps to display a 16-camera split view. H. Simultaneous display and recording of every camera shall be supported with independent user-adjustable frame rates that can be set differently for the display stream and the recording stream. These independent settings shall be unique per camera. I. The NVMS monitoring software shall support any combination of recorded and live video in any multiple camera split view, including viewing recorded video and live video from the same camera. J. The NVMS shall support continuous recording and event-based recording simultaneously. This shall be capable of being set on a per camera basis. 1121 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 9 VIDEO SURVEILLANCE K. Viewing of video (live and recorded) shall be possible from client software from any client hardware that is connected to the security LAN/WAN or Internet (through appropriate firewalls). In addition, system administration shall be permitted from remote client hardware. 2.2 NVMS MANUFACTURERS A. Basis of Design: 1. Milestone 2.3 NVMS SERVER REQUIREMENTS A. The NVMS shall operate on the Windows Server 2019 IoT Essentials Operating System. The server software shall be a multi-tasking, multi-threading application system architecture designed specifically for the Windows environment. B. The server shall communicate on a TCP/IP based Ethernet LAN capable of utilizing 100/1000BaseT. C. The server shall be provided by the NVMS system vendor. D. The server(s) requirements have been calculated based on the NVMS Basis of Design manufacturer noted above. By submitting a bid, the Contractor acknowledges that the calculated server requirements listed here may not be sufficient for a listed alternate, acceptable manufacturer selected by the Contractor. The Contractor shall modify the calculated server requirements listed herein based on the calculated requirement of the chosen manufacturer. The server requirements for the basis of design are as follows: 1. Server Quantity and Location: Refer to project drawings for quantity of servers required and their location. 2.4 NVMS CLIENT REQUIREMENTS A. The NVMS PC workstation(s) shall be provided by the Owner. 2.5 NVMS RECORDING REQUIREMENTS A. The NVMS shall provide management of the recording and playback of video, audio, and data (bookmarking, alarm data, etc.). B. Refer to the Camera Schedules on the project drawings for specific variables to be used on a per-camera basis for the purpose of calculating storage capacity and retention. 1. Total distributed storage requirements shall be determined based on a minimum of one (1) year storage retention. 2. Cameras, unless otherwise noted on the Camera Schedule(s), shall be assumed to be recording 24 hours per day, 7 days per week, 365 days per year. Specific per- camera assumptions stated on the Camera Schedule for percent motion shall be used in the storage calculation. 1122 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 10 VIDEO SURVEILLANCE 3. Compression shall be permitted to be used in the storage calculation. The compression algorithm (MPEG-4, H.264, etc.) shall be used on a per-camera basis. If the NVMS permits variable levels of compression intensity, the use of the "average" or "medium" level setting shall be used in the storage calculation unless otherwise noted. 4. The Contractor shall provide the complete storage analysis and calculation as a shop drawing. C. Network Video Recorder (NVR) Hardware Platform: 1. The NVR shall be defined as a storage device for recording IP video streams from IP cameras or from analog cameras that have been encoded to IP. In both cases, the NVR shall record IP streams from cameras or encoders located anywhere on the IP network without being direct-cable connected to the NVR. 2. Refer to the project drawings for specific requirements, model numbers, and basis of design for the NVR. 3. NVR Configuration: a. The NVR shall contain one hard drive for the operating system and software, and all hard drive storage required to achieve the required storage retention. b. Provide with RAID 5 hard disk controller configuration for the video storage hard drives. 4. The NVMS shall provide a failover function where an NVR can be assigned as a backup to other NVRs. When an assigned NVR goes out of service, the failover NVR takes over the responsibilities of the failed NVR. When the primary NVR returns to service, the control shall be automatically transferred back to the primary NVR. 5. It shall be possible to assign a redundant NVR to every NVR for use in normal operation of all NVR(s) in the system. The redundant NVR shall record the same streams as the primary NVR. The redundant NVR shall have its own disk drives where it shall store the recorded data. a. It shall be possible to view the data recorded by the redundant NVR in the client software. The redundant NVR shall have camera symbols that can be placed in the camera selection tree. These cameras shall have the same name as the cameras of the primary NVR. An indication shall be provided to indicate that the camera names are located on the redundant NVR. 2.6 NVMS CABLING A. Refer to Division 27 for all cabling requirements. PART 3 - EXECUTION 3.1 INSTALLATION A. Comply with the manufacturer's instructions and recommendations for installation of all products. 1123 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 11 VIDEO SURVEILLANCE B. Provide all system wiring between all components as shown on the project drawings or as directed by the manufacturer, whichever is the more stringent requirement. C. Mount all cameras in the approximate locations shown on the drawings. Coordinate installation with other trades and utilities in the vicinity. Cameras containing fixed lenses, moved by more than 1'-0" from their location shown on the drawings, shall have a new lens calculation performed by the Contractor. Provide Architect/Engineer with results of lens calculation before proceeding with installation. D. Coordinate with Owner's IT Department to acquire network connections as well as any network configuration information, such as IP numbers, that will be required to connect NVMS to Owner network (if applicable). E. Provide all low voltage and +120 VAC power to all devices as required for proper system operation. Refer to Sections 26 05 33 and 26 05 13 for further requirements. F. All low voltage security wiring shall be routed with other low voltage cabling and shall use the cable tray to the fullest extent possible. G. Cabling shall be plenum rated when installed outside of conduit in plenum ceilings. 3.2 FIELD QUALITY CONTROL A. Where these specifications require a product or assembly without the use of a brand or trade name, provide a product that meets the requirements of the specifications as supplied and warranted by the system vendor. If the product or assembly is not available from the system vendor, provide product or assembly as recommended by the system vendor. B. Periodic observations will be performed during construction to verify compliance with the requirements of the specifications. These services do not relieve the Contractor of responsibility for compliance with the project drawings. C. It shall be the Contractor's responsibility to correct all inadequate picture quality issues prior to acceptance of the system. 3.3 MANUFACTURER'S FIELD SERVICES A. Installation shall be performed by a factory-trained and certified Contractor. 1. Provide a comprehensive, site-specific customer planning guide for the system. Conduct a conference with the Owner prior to any installation to discuss the programming options of the system and the planning guide. The result of this planning guide shall be the determination of the system options for each device and for the software. B. Include labor for all planning and all programming activities required to implement the Owner's operational preferences for each device and software. Any software programmable option, within the bounds of the capabilities of the hardware specified, shall be included. C. Provide a complete, functional system as described by the project drawings. These responsibilities include: 1124 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 12 VIDEO SURVEILLANCE 1. Complete hardware setup, installation, wiring, and software configuration of the system, including all remote operator locations and all peripheral hardware. 2. Complete programming of all hardware and software options in accordance with the Owner's preferences as determined by the planning guide conference. 3. Programming of all custom graphic GUI screens including devices. 4. Complete system diagnostic verification. D. Provide an authorized manufacturer representative to commission the system and ensure that facility-wide standards and project setup procedures are adhered to. 3.4 SYSTEM ACCEPTANCE A. Submit for review a formal acceptance and system checkout program. The system checkout procedures shall include all system components and software. Perform the tests and document all results under the supervision of the manufacturer's system engineer. B. All operational scenarios, as defined by the customer planning guide, shall be tested to simulate the actual use of the system in the normal operating environment. The successful completion of these operational scenarios shall be documented. 3.5 SYSTEM DOCUMENTATION A. Complete documentation shall be provided for the system. The documentation shall describe: 1. All operational parameters of the system. 2. Complete documentation of all programming and options. 3. Complete operating instructions for all hardware and software. B. The following sections shall be provided in the system documentation: 1. System Administrator Manual: Provides an overview and a step-by-step guide and instructions detailing all system administrator responsibilities and functions. 2. User Manual: A step-by-step guide and instructions detailing all system user functions. 3. Technical Maintenance Manual: A comprehensive document providing all maintenance actions, system testing schedules, troubleshooting flowcharts, functional system layout, wiring diagrams, block diagrams, and schematic diagrams. 3.6 SYSTEM TRAINING A. All labor and materials required for on-site system training by a certified representative of the system manufacturer shall be provided. Training shall be conducted at the project site using the project equipment. B. Provide two weeks advanced notice of training to the Owner. C. Provide a training outline agenda describing the subject matter and the recommended audience for each topic. D. At a minimum, the following training shall be conducted: 1125 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 23 00 - 13 VIDEO SURVEILLANCE 1. System Administrators: A course detailing the system functions and operations. Provide configuration training on all aspects of the system. 2. Users: Provide a detailed course outlining the operational features of all aspects of the user interface. Topics shall include alarm monitoring functions, reports, error handling, alarm handling, output relay control, and general overview of the report hardware. 3. GUI Editing: Conduct detailed training on using the GUI editing software. Topics shall include the editing of existing graphical maps and the creation of new graphical maps. E. Minimum on-site training times shall be: 1. System Administrators: Three (3) days. 2. Users: One (1) day. 3. GUI Editing: One (1) day. END OF SECTION 28 23 00 1126 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 26 05 - 1 RESCUE ASSISTANCE COMMUNICATION SECTION 28 26 05 RESCUE ASSISTANCE COMMUNICATION PART 1 - GENERAL 1.1 DESCRIPTION A. General: 1. Furnish all labor, materials, tools, equipment and services for a complete area of Rescue Assistance Communication System as indicated in Contract Documents and as required by the American with Disabilities Accessibility Guidelines (ADAAG). 2. Completely coordinate with work of all other trades. 3. Although such work is not specifically indicated, furnish and install all supplementary or miscellaneous items, appurtenances and devices incidental to or necessary for a sound, secure and complete installation. 1.2 QUALITY ASSURANCE A. Transistors, capacitors, resistors, integrated circuits and other components shall not be operated to exceed their rated values. Design systems for 24-hour continuous operation. 1.3 SUBMITTALS (REFER TO SECTION 28 05 00) A. Product Data: 1. Technical data on each product including finishes. 2. Description of system operation. 3. Riser diagrams and system data. 4. Equipment design considerations for future expansion when indicated. 5. Materials list and backbox schedule (including unique backboxes). B. Project Data: 1. Operating and Maintenance Data: Refer to Section 28 05 00. a. Factory-prepared operation and service manual for each system. b. Include operation details, schematics, wiring diagrams, color coding, terminal numbers and component values for printed-circuit boards. c. Owner Instruction Reports: Refer to Section 28 05 00. 1.4 OPERATION A. General: Provide two way audible/visual communication between a master annunciator station and the area of rescue assistance communication stations. 1127 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 26 05 - 2 RESCUE ASSISTANCE COMMUNICATION 1.5 SYSTEM OPERATION A. The master annunciator panel shall be located as defined on the drawings. Calls placed between rescue assistance stations and the master annunciator panel shall be identifiable at the master annunciator panel to indicate which station has placed a call. The master annunciator panel shall include both a handset and a speakerphone to allow two-way communication to each station. Upon activation of an emergency pushbutton at call stations, a call will automatically be placed to the master annunciator panel. If no one answers the call, it shall automatically dial a secondary location to a continuously manned location. B. Rescue assistance stations shall be located on each level above the first floor of the building within elevator lobbies. C. Call stations shall provide audible and visual indication that a call has been placed. PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. Rath IP Series 2.2 EQUIPMENT A. Master Remote Annunciator shall consist of a modular arrangement of intercom 'ON' and flashing red zone LED indicators in multiples of four zones. The annunciator panel shall include a "push to talk" and an audible alarm device with a sound level of not less than 90 dB at 30 cm. The panel shall be constructed of 0.125" thick clear anodized aluminum. Permanent silk-screened zone designations shall be provided on the panel as well as a designation strip. Backbox and panel dimensions will vary depending upon system configuration and number of zones required. B. Power source shall be a transformer rated for total system devices with an optional battery-backed DC power supply with battery supply for continuous operation of 4 hours. C. Wiring to call station shall be supervised. In the event of a wire fault, a yellow LED zone indicator on the annunciator shall illuminate and a repeating audio alarm shall sound. D. Remote rescue assistance call station shall consist of one momentary switch with LED, incandescent lamp not acceptable, and one audible alarm device with a minimum sound level of not less than 70 dB at 30 cm all mounted on a one gang stainless steel plate. Permanent silk-screened designations shall be provided on the plate. E. Wiring shall consist of 22 gauge (minimum) wire or as indicated on drawings. Three conductors plus one shielded pair are required between each rescue assistance call station and the annunciator panel not to exceed 3,000 feet. Power wire shall be 12 gauge (minimum). Two conductors are required between the power supply or transformer and the annunciator panel. 1128 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 26 05 - 3 RESCUE ASSISTANCE COMMUNICATION PART 3 - EXECUTION 3.1 INSTALLATION A. Install all components and complete system as indicated and in accord with manufacturer's recommendations and instructions. B. All cabling shall be installed to meet the applicable requirements for pathway survivability. Cabling installation shall consist of the following: 1. 2-hour fire rated circuit integrity (CI) cable 2. 2-hour fire rated cable system 3. 2-hour fire rated enclosure or protected area C. Contractor is to provide and install a typewritten list in a Plexiglas frame permanently fastened to the wall next to the master rescue assistance annunciator panel to indicate the building location of each of the remote area of rescue assistance call stations and to which annunciator zone and LED they correspond. D. Contractor is to provide a typewritten list of area of rescue assistance communication instructions in a Plexiglas frame permanently fastened to the wall next to each remote switch and the annunciator panel to explain the operation of the system. E. Provide code-required signage acceptable to the Authority Having Jurisdiction at each call station location. 3.2 SYSTEM TESTING A. Test each component and complete system for proper operation, including all modes. Perform correctional work when required. Testing shall be done in the presence of the Owner's Representative(s). 3.3 OWNER PERSONNEL INSTRUCTION A. Instruct maintenance and staff personnel in complete operation, including actual staff use of system, by authorized distributor personnel. Arrange timing of the session in writing to best coordinate with Owner's working hours. Allow four (4) hours of training. This training session shall be videotaped by the Contractor. END OF SECTION 28 26 05 1129 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 1 FIRE ALARM AND DETECTION SYSTEMS SECTION 28 31 00 - FIRE ALARM AND DETECTION SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. The fire alarm and detection system shall be included as a deferred submittal package. B. The fire alarm and detection system shall be Owner Furnished Owner Installed. Contractor to coordinate with Owner's Vendor for Owner Furnished Owner Installed Fire Alarm System. C. Performance-based designs shall be submitted to the Authority Having Jurisdiction (AHJ) for review and approval in a format acceptable to the approving authority. The submittal shall include documentation for each system function, performance objective, integration with other system(s), and design configuration. Documentation shall also include design calculations for system batteries, voltage drop, and other AHJ-requested items. The AHJ shall act as the sole authority for approval and shall approve all applicable modifications/variations to the design prior to installation. D. The fire alarm and automatic detection systems shall be designed, stamped, programmed, submitted for approval, installed, tested, and commissioned as a turnkey solution by the Contractor. Contractor shall be responsible for the coordination and interface of other systems. E. The contract documents define the minimum fire alarm system requirements. The most stringent requirement/interpretation shall apply when there is a discrepancy among the contract documents, code-minimum requirements, and the interpretation of the AHJ. No additional costs to owner to incorporate AHJ requirements for plan approval. F. The scope of the fire alarm and automatic detection system includes interface and integration with the following systems. The following list is provided as a courtesy. Contractor shall review the entire set of contract documents to identify the project-specific conditions and third-party systems requiring fire alarm interface and integration. 1. Fire Protection (Sprinkler): Monitor modules, flow switches, post indicator values, sprinkler system, fire alarm cabinets, electric bells. 2. Dry Chemical Fire Protection Systems. 3. Fire Smoke Dampers Air Handing Unit Systems: Fire/smoke dampers shall be closed in groups by air handling system. Fire/smoke dampers shall be closed when air handling systems are not operational. 4. Elevator Control: Machine room (or roomless) / lobby / shaft detection, elevator recall operation, hoistway damper control, fire fighter operation. 5. Ceiling Fan Control: Shutdown control of larger ceiling fans per NFPA 13. 1130 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 2 FIRE ALARM AND DETECTION SYSTEMS 1.2 RELATED WORK A. Section 26 05 53 - Electrical Identification: Refer to electrical identification for color and identification labeling requirements. 1.3 QUALITY ASSURANCE A. Installer: A factory-authorized electrical or security contractor licensed with the State and local jurisdiction with five years' experience in the design, installation and maintenance of fire alarm systems by that manufacturer. B. Qualifications: The person managing/overseeing the preparation of shop drawings and the system installation/programming/testing shall be trained and certified by the system manufacturer and shall be Fire Alarm Certified by NICET, minimum Level 2. This person's name and certification number shall appear on the start-up and testing reports. 1.4 REFERENCES A. ASME A17.1 - Safety Code for Elevators and Escalators B. NFPA 20 - Standard for Centrifugal Fire Pumps C. NFPA 70 - National Electrical Code (NEC) D. CEC California Electrical Code E. NFPA 72 - National Fire Alarm and Signaling Code F. NFPA 101 - Life Safety Code G. UL 2017 - General Purpose Signaling Devices and Systems H. UL 217 / 268 - Standard for Smoke Alarms / Smoke Detectors for Fire Alarm Systems I. UL 2572 - Control and Communication Units for Mass Notification Systems J. California Fire Code (CFC) 1.5 SUBMITTALS A. Submit shop drawings and product data under provisions of Section 26 05 00 and as noted below. 1. Failure to comply with all the following and all the provisions in 26 05 00 will result in the shop drawing submittal being rejected without review. 2. Failure to submit the fire alarm without all requirements fulfilled in a single comprehensive submittal will be grounds to require a complete resubmittal. B. Provide product catalog data sheets as shop drawings. 1131 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 3 FIRE ALARM AND DETECTION SYSTEMS 1. Provide a product catalog data sheet for each item shown on the Electrical Symbols List and for each piece of equipment that is not shown on the drawings, but required for the operation of the system. 2. Where a particular Electrical Symbols List item has one or more variations (such as those denoted by subscripts, etc.) a separate additional product catalog data sheet shall be provided for each variation that requires a different part number to be ordered. The corresponding Electrical Symbols List symbol shall be shown on the top of each sheet. 3. Where multiple items and options are shown on one data sheet, the part number and options of the item to be used shall be clearly denoted. C. Submit CAD Floor Plans as Shop Drawings: 1. The complete layout of the entire system, device addresses, auxiliary equipment, and manufacturer's wiring requirements shall be shown. 2. Indicate the precise routing of notification appliance circuits under the provisions of circuit survivability. Refer to "Wiring" under Part 3 - Execution of this specification section for requirements. 3. A legend or key shall be provided to show which symbols shown on the submittal floor plans correspond with symbols shown on the Contract Documents. D. About all fire alarm circuits, provide the following: manufacturer's wiring requirements (manufacturer, type, size, etc.) and voltage drop calculations. E. Provide installation and maintenance manuals under provisions of Section 26 05 00. F. Submit manufacturer's certificate that system meets or exceeds specified requirements. G. Provide information on the system batteries as follows: total battery capacity, total capacity used by all devices on this project, total available future capacity. H. Submit photocopy proof of NICET certification of the person overseeing the preparation of drawings and installation/testing. I. When required to comply with local or state regulatory reviews, the fire alarm submittal shall have a Professional Engineer's stamp and signature NICET Certification of the state in which the project is completed. J. EXTRA MATERIALSFurnish extra materials per City approvalthat match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Provide quantity equal to 2 percent (2%) of amount of each type installed, but no less than two (2) units of each type. a. Smoke and heat detectors, manual pull stations, duct smoke detectors, monitor modules, control modules and relays. b. Notification Appliances: Speakers, speaker strobes, and strobes. 1132 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 4 FIRE ALARM AND DETECTION SYSTEMS 2. Keys: The installing contractor shall collect all equipment spare keys provided with each lockable or resettable device/cabinet minimum of one (1) set each and shall turn over to the Owner upon completion. 3. All spare parts shall be housed in metal cabinet labeled "Fire Alarm Spare Parts." 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver products to site under provisions of Section 26 05 00. B. Store and protect products under provisions of Section 26 05 00. 1.7 REGULATORY REQUIREMENTS A. System: UL or FM Global listed. B. Conform to requirements of NFPA 101. C. Conform to requirements of Americans with Disabilities Act (ADA). D. Conform to UL 864 Fire Alarm, UL 1076 Security, UL2017 General Signaling, and UL 2572 Mass Notification Communications. 1.8 CODES, LAWS, AND ORDINANCES A. The fire alarm design shall comply with the following applicable codes, laws, and standards: 1. ASME A17.1 Safety Code for Elevators and Escalators 2. IFC 2018 International Fire Code with local amendments 3. NFPA 72 National Fire Alarm & Signaling Code 2019 4. NFPA 70 National Electrical Code 2020 5. NFPA 101 Life Safety Code 6. NFPA 20 Standards for Centrifugal Fire Pumps 7. NFPA 13 Installation of Sprinkler Systems 8. NFPA 80 Fire Door and other Opening Protectives 9. NFPA 101 Life Safety Code 10. Conform to all requirements of State of California codes, laws, ordinances and other regulations having jurisdiction. 11. Conform to published standards of City of Moorpark. 1.9 SYSTEM DESCRIPTION A. Performance Statement: This specification section and the accompanying fire alarm specific design documents describe the minimum material quality, required features, and operational requirements of the system. These documents do not convey every wire that must be installed and every equipment connection that must be made. Based on the equipment described and the performance required of the system, as presented in these documents, the Vendor and the Contractor are solely responsible for determining all wiring, programming and miscellaneous equipment required for a complete and operational system. 1133 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 5 FIRE ALARM AND DETECTION SYSTEMS B. This section of the specifications includes the furnishing, installation and connection of the microprocessor controlled, intelligent reporting, fire alarm equipment required to form a complete coordinated system that is ready for operation. It shall include, but is not limited to, alarm initiating devices, control panels, auxiliary control devices, annunciators, power supplies, and wiring as indicated on the drawings and specified herein. C. Fire Alarm System: NFPA 72; Automatic and manual fire alarm system, non-coded, analog-addressable with automatic sensitivity control of certain detectors, multiplexed signal transmission. D. System Supervision: Provide electrically supervised system, with supervised Signal Line Circuit (SLC) and Notification Appliance Circuit (NAC). Occurrence of single ground or open condition in initiating or signaling circuit places circuit in TROUBLE mode. Component or power supply failure places system in TROUBLE mode. E. Alarm Reset: Key-accessible RESET function resets alarm system out of ALARM if alarm initiating circuits have cleared. F. Lamp Test: Manual LAMP TEST function causes alarm indication at each zone at fire alarm control panel and at annunciator panels. G. Drawings: Only device layouts and some equipment have been shown on the contract drawings. Wiring and additional equipment to make a complete and functioning system has not been shown, but shall be submitted on the shop drawings. 1.10 SYSTEM DESIGN CRITERIA A. Audio Notification: Horn based; full exterior coverage B. Visual Notification: Full coverage C. Automatic Fire/Smoke/Heat Detection: Partial coverage D. Full coverage is defined as all occupiable interior spaces. E. Partial coverage is defined as all commonly occupied spaces including corridors, lobbies/waiting, toilets/restrooms, open office areas, meeting rooms, common work spaces, storage, mechanical/electrical spaces, and stairways. 1.11 AUTOMATIC DETECTION DESIGN CRITERIA A. Smoke Detectors: Environmentally conditioned spaces not susceptible to dirt and dusty conditions. B. Combination Rate of Rise and 135°F Heat Detectors: Environmentally conditioned spaces susceptible to the accumulation of dirt or dusty conditions; examples: paper processing areas, storage rooms, mechanical/electrical spaces, back-of-house areas, trash/recycle collections spaces. 1134 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 6 FIRE ALARM AND DETECTION SYSTEMS C. 200°F Fixed Temperature Heat Detectors: Environmentally conditioned spaces subject to higher maintained ambient temperatures; examples: elevator shafts. D. Air Sampling Smoke Detectors 1.12 PROJECT RECORD DOCUMENTS A. Submit documents under the provisions of Section 26 05 00. B. Include location of end-of-line devices. C. Provide a CAD drawing of each area of the building (minimum scale of 1/16" = 1'-0") showing each device on the project and its address. The devices shall be shown in their installed location and shall be labeled with the same nomenclature as is used in the fire alarm panel programming. D. Submit test results of sound pressure level (dBA) and intelligibility (STI) with the rooms tested designated on the floor plan. Notification devices shall have the tap wattage designated. 1.13 OPERATION AND MAINTENANCE DATA A. Submit data under provisions of Section 26 05 00. B. Include operating instructions, and maintenance and repair procedures. C. Include results of testing of all devices and functions. D. Include manufacturer's representative's letter stating that system is operational. E. Include the CAD floor plan drawings. F. Include shop drawings as reviewed by the Architect/Engineer and the local Authority Having Jurisdiction. 1.14 DOCUMENT STORAGE CABINET A. The cabinet shall have all fire alarm system documents, including record drawings, wiring diagrams, operation manuals, etc. A legend sheet permanently attached to the door shall contain system passwords and inspection logs. The enclosure shall also provide two (2) key ring holders for system keys and a location for a standard size business card with service contact information. B. The cabinet will have, permanently and securely mounted inside, a digital flash memory device with a minimum of 4 GB of storage capacity and a standard USB B connector for uploading and downloading electronic versions of record documents and system programming information. C. The cabinet shall be red in color with an identification label reading "FIRE ALARM DOCUMENTS". Refer to Identification Section 26 05 53. The cabinet shall be lockable. The minimum cabinet size shall be 14" x 14" x 48". 1135 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 7 FIRE ALARM AND DETECTION SYSTEMS D. The final version of the system database program shall be stored within the cabinet. E. Locate cabinet as shown on the drawings. 1.15 WARRANTY A. Provide one (1) year warranty on all materials and labor from Date of Noticeof Substantial Completion. B. Warranty requirements shall include furnishing and installing all software upgrades issued by the manufacturer during the one (1) year warranty period. 1.16 ANNUAL INSPECTION/TESTING AND SERVICE CONTRACT A. Provide cost to furnish service, inspect, and test all devices of the fire alarm system per the requirement of NFPA for one (1) year, starting one year after the Date of Substantial Completion. Submit written reports of inspection testing per NFPA 72, Chapter 14. B. Provide an alternate cost for a complete inspection/testing and service/maintenance contract for the fire alarm system for one (1) year, starting one year after the Date of Substantial Completion. Submit sample contract terms and conditions for review with shop drawings. C. The Owner may enter into a contract directly with the vendor after shop drawing submittals. This specification is not a contract between the Owner and the vendor to perform these services. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Notifier by Honeywell B. Edwards - EST C. Gamewell - FCI 2.2 FIRE ALARM CONTROL PANEL (FAP) A. Control Panel: Modular, power-limited electronic design. Provide surface wall-mounted enclosure as shown on plans. Enclosure shall be minimum 0.060 steel with provisions for electrical conduit connections into the sides and top. The door shall provide a key lock and shall include a glass or other transparent opening for viewing of all indicators. B. Each Signaling Line Circuit (SLC loop) shall not be loaded over 80% of the maximum device capacity. For example, in the minimum system capacity column listed below, if the fire alarm manufacturer's system capacity of analog sensors per loop is 99 devices, then no more than 79 devices shall be wired on that loop. The minimum system capacity shall be as follows: 1136 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 8 FIRE ALARM AND DETECTION SYSTEMS 1. Panel Expansion Capability, Minimum Total SLC Loops: 10 2. Minimum Node Capacity for Network System: 100 C. Signal Line Circuit (SLC) and Notification Appliance Circuit (NAC) Boards: 1. Each board shall communicate directly with each addressable analog sensor and binary input to determine normal, alarm, or trouble conditions. Analog signals would be used for automatic test and determination of maintenance requirements. 2. Each board shall contain its own microprocessor and shall be provided to monitor addressable inputs and to control addressable outputs (addressable relays). The board shall communicate and provide power to all devices on its loop over a single pair of wires, except where 4-wire devices require a separate power circuit. D. Central Processing Unit: 1. The central processing unit (CPU) shall communicate with the monitor and control all other modules in the panel. Removal, disconnection or failure of any control panel module shall be detected and reported to the CPU. 2. The CPU shall execute all control-by-event programs for specific action to be taken if a designated situation is detected in the system. A real-time system clock for time annotations on the display and printer shall be included. 3. All power for the unit shall be supervised and supplied by the FAP. E. Display: 1. The board shall provide all controls and indicators used by the system operator and may also be used to program all control panel parameters. 2. The board shall provide an alphanumeric array for display of custom alphanumeric labels for all addressable points. It shall also provide indicators for AC Power, System Alarm, System Trouble, Display Trouble and Signal Silence. 3. Displayed descriptions of addressable points shall include actual room names/numbers selected by the Owner. This information shall be obtained prior to programming. Room names/numbers shown on floor plans shall not be used. 4. The board shall provide a touch key-pad with control capability to command all system functions and entry of any alphanumeric information. Twenty different passwords with four levels of security shall be supported to prevent unauthorized manual control or programming. F. Memory: The CPU and display interface board shall be augmented by non-volatile field programmable memory. EPROM memory will also be allowed provided the memory is burned in with minimum expansion capability equal to the total system capacity of the panel. Memory shall not be lost upon primary and secondary power failure. G. Serial Interface Board: The board shall provide interfaces to a printer, LCD display and other monitoring devices through RS-232 connections. The minimum operational distance between the board and the peripheral devices shall be 500 feet. Up to three (3) RS-232 outputs shall be supported. 1137 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 9 FIRE ALARM AND DETECTION SYSTEMS H. Power Supply: 1. Input power shall be 120 VAC, 60 Hertz. Output power shall be as noted on the device specifications and drawings. Each component of the fire alarm system requiring 120 VAC input power shall be served from a dedicated emergency branch circuit. Provide two #12 conductors and one #12 ground in 3/4" conduit to a dedicated 20A/1P circuit breaker with a red handle and a manufacturer's standard handle lock-on device. Identify/label breaker and branch circuit in accordance with NFPA requirements and Specification Section 26 05 53. 2. Adequate to supply 125% of all control panel and peripheral power needs as well as 125% of power required for all external audio-visual devices. The power supply may be increased as needed by adding additional modular expansion power supplies. Over-current protections shall be provided on all power outputs. 3. All power supplies shall be designed and installed to meet UL and NFPA requirements for power-limited operation on all external initiating and indicating circuits. 4. The power supply shall provide integral charger for use with internal batteries. Battery capacity shall be sufficient for operation of the entire system for 24 hours in a non-alarm state followed by alarm mode for 15 minutes, plus 25% spare capacity for future devices. I. Surge Protection: 1. All fire alarm control panels, NAC panels, etc. shall be provided with a surge protection device (SPD). The SPD shall be UL listed to Standard 1449 Rev 3. The unit should be clearly labeled in accordance with Identification Section 26 05 53. The SPD shall have thermal fuses to protect against fire in short circuit conditions. The unit shall provide visual indication that the unit is protecting and functioning. 2. Any communications or signaling circuits associated with the fire alarm system, which leave or enter a facility, shall be provided with a surge protection device. The devices shall be as recommended by the fire alarm system manufacturer. J. Dual Digital Communicator: 1. Provide dual phone line interface capable of fire alarm notification to the local fire department, fire protection agency, or monitoring service. Communicator shall report in SIA and most major communication formats, with the capability of transmitting each device address point in a format compatible with the central station receiver. 2. Monitoring fees and initial connection charges are not part of this project. 3. Communicator shall be fully supervised and shall operate on loop start phase lines ahead of the building PBX system. 4. Communicator shall be FCC registered. Contractor shall provide two RJ31X jacks. Contractor to provide connection of communicators to Owner's telephone system as shown on the drawings. 5. Approvals: UL listed - UL 864/NFPA 72, FM approved. 6. The communicator shall be provided integral to the fire alarm panel as furnished by the fire alarm panel manufacturer. If the panel construction requires a separate unit, the unit shall be as manufactured by Silent Knight, Ademco, or fire alarm panel manufacturer approved equal. 1138 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 10 FIRE ALARM AND DETECTION SYSTEMS 2.3 FIRE ALARM PATHWAY CLASS AND SURVIVABILITY LEVEL A. Pathway Class: 1. Pathway Class B: Circuits NOT capable of transmitting an alarm beyond the location of the fault condition. Wiring of outgoing and return conductors is permitted to be run in the same conduit or cable. 2.4 FIRE ALARM TERMINAL CABINET (FATC) A. Fire Alarm Terminal Cabinet with locked hinged door. Provide as an extension of the main fire alarm system. 2.5 SIGNALING LINE CIRCUIT DEVICES A. Combination Devices: Subscripts identify combination type devices when applicable. Contractor shall provide the combination device or provide multiple device(s) to meet the functionality when the manufacturer does not offer the required functionality with a single device. B. Signal Line Device(s): 1. Subscripts: Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. Device types as follows: 1) W - Weather Proof 2) WG = Wire guard is required 3) Candela Ratings: a) ## = 15 Candela; 30 Candela; 75 Candela; 110 Candela; 177 Candela b) CD = NICET designer shall select Candela rating as required to provide full coverage of the space. b. Sequence of operation as follows: 1) A=Atrium 2) CA = Clean Agent System 3) CR=Computer Room 4) E=Elevator Recall 5) D=HVAC Control 6) DH=Door Hold Release 7) DIPS = Dual Interlock Pre-Action System 8) FD= Fire Door Release 9) MP=Medical Procedure Room 10) S=Sleeping / Patient Room 11) SW=Stairwell 1139 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 11 FIRE ALARM AND DETECTION SYSTEMS C. FA-120; Smoke Detectors: 1. Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. Device types as follows: 1) Blank = Photoelectric 2) AT = Attic (located in) 3) BR = Beam Receiver 4) BT = Beam Transmitter 5) CO = Combination Smoke / Carbon Monoxide 6) COH = Combination Smoke / Carbon Monoxide / Heat 7) COS = Combination Smoke / Carbon Monoxide / Strobe 8) H = Combination Smoke / Heat Detectors 9) ION = Ionization Type 10) ID = In-Duct Detector 11) SA = Stand Alone with Sounder 12) SB = Sounder Base 13) SV = Stand Alone with Sounder and 177 Candela Strobe 2. (BLANK) Analog Photoelectric Type Sensor: Shall use the photoelectric principle to measure smoke density and send data to the control panel representing the analog level of smoke density measured. 3. (H) Combination Smoke / Heat Detector: a. Multi-criteria sensor for photoelectrical smoke sensing and rate of rise heat detection. Carbon monoxide electrolytic sensing module shall provide toxic gas sensing to UL2034 and UL2075 standards. b. The detector shall use only one address on the SLC. 4. (IN) In-Duct Smoke Detectors: a. Analog Photoelectric Type Sensor: Shall use the photoelectric principle to measure smoke density and send data to the control panel representing the analog level of smoke density measured. b. Analog Ionization Type Sensor: Shall use the dual chamber ionization principle to measure smoke density and send data to the control panel representing the analog level of smoke density measured. c. Low Flow Type: Listed for use in duct with 0-2000 feet per minute velocity. d. Each smoke detector shall connect directly to an SLC loop. e. Each detector shall be mounted, where shown on the drawings, on a twist-lock base with all mounting hardware provided to match the duct application. Provide a two-piece head/base design. f. Each detector shall have a manual switching means to set the internal identifying code (address) of that detector, which the control panel shall use to identify its address with the type of sensor connected. g. Provide a remote LED indicator device (FA-240/241), mounted in ceiling directly below detector with a single-gang faceplate labeled: Duct Smoke Detector. 1140 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 12 FIRE ALARM AND DETECTION SYSTEMS 5. Each smoke detector shall connect directly to an SLC loop, unless listed as stand alone. 6. Each detector shall be mounted, on a twist-lock base with all mounting hardware provided. Provide a two-piece head/base design. 7. Each detector shall have a manual switching means to set the internal identifying code (address) of that detector, which the control panel shall use to identify its address with the type of sensor connected. 8. Dual alarm and power indicators shall be provided that flash under normal conditions and remain continuous under alarm or trouble conditions. Remote indicator terminals shall be provided. Provide a remote LED indicator device if detector is not visible from a floor standing position. 9. A test means shall be provided to simulate an alarm condition. 10. Where operation is noted as required below 32°F and/or above 120°F, a conventional device shall be installed with a unique monitor module located in the nearest available location with maintained temperatures between 32°F and 120°F. D. FA-122; Duct Smoke Detectors, Sampling Tube Type: 1. Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. Device types as follows: 1) # = Equipment or system b. Duct-type smoke detectors shall use the same analog photoelectric sensor technology, with the same features specified for standard smoke detectors, except with additional features as specified below. c. Provide sampling tubes and mounting hardware to match the duct to which it is attached. Where the detector housing is larger than the duct height, Contractor shall fabricate a mounting bracket for the detector and attach according to the fire alarm manufacturer's recommendations. d. Provide a remote alarm LED indicator device (FA-241 or FA-242) if detector is not visible from a floor-standing position. If detector is located above a suspended ceiling, mount remote indicator in ceiling directly below detector with a white single-gang faceplate labeled: Duct Smoke Detector. E. FA-130; Manual Pull Stations: 1. Manual pull station, addressable, double action, reset key lock, semi-flush mount, red high abuse plastic or cast metal construction with white lettering. Provided with all necessary mounting hardware. Use surface mount only on precast concrete or structure. 2. Manual stations shall connect directly to an SLC loop. Stations shall provide address setting means using rotary decimal or DIP switches. 3. Where operation is noted as required below 32°F and/or above 120°F, a conventional device shall be installed with a unique monitor module located in the nearest available location, with maintained temperatures between 32°F and 120°F. 1141 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 13 FIRE ALARM AND DETECTION SYSTEMS F. FA-140; Heat Detectors: 1. Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. Device types as follows: 1) Blank = Combination Rate of Rise / Fixed Temp 2) AT = Attic (located in) 3) F = Fixed Temp 4) RC = Rate Compensated 5) X = Explosion Proof 2. (BLANK) Combination rate of rise and 135°F fixed temperature analog thermal type sensor. Factory programmed to alarm at 135°F and at 15°F per minute rate-of-rise. Sensor shall measure heat level and send data to the control panel representing the analog level of thermal measurement and rate-of-rise. 3. (F) 200°F fixed temperature. Provide a remote addressable monitor module to interface with addressable system as shown on the plans. 4. (RC) Rate Compensated 5. Provide a two-piece head/base design, with a manual switching means to set the internal identifying code (address) of that detector, which the control panel shall use to identify its address with the type of sensor connected. 6. Heat detectors shall connect directly to SLC loops. Where fixed temperature or explosion proof detectors are used, one monitor module may be used to monitor all detectors in one room/area as shown on the drawings. 7. Detectors shall be mounted, on a twist-lock base with all mounting hardware provided. 8. Provide a remote LED indicator device if detector is not visible from a floor-standing position. 9. Dual alarm and power indicators shall be provided that flash under normal conditions and remain continuous under alarm or trouble conditions. A connection for attachment of a remote indicator shall be provided. 10. A test means shall be provided to simulate an alarm condition. 11. Where operation is noted as required below 32°F and/or above 120°F, a conventional device shall be installed with a unique monitor module located in the nearest available location with maintained temperatures between 32°F and 120°F. G. FA-160; Monitor Modules: 1. Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. Device types as follows: 1) Blank = Refer to Plans 2) KB = Knox Box Monitor 1142 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 14 FIRE ALARM AND DETECTION SYSTEMS 2. Monitor Module shall connect directly to an SLC loop and receive power from a separate 24 VDC circuit. It shall interface initiating devices with the control panel using Style D or Style B circuits. Contractor option: Use an interface module (2-wire operation) for Style B circuits connected to normally-open dry contacts, such as a flow switch. 3. The module shall be mounted in an enclosure located in an accessible service location as near as possible to the device(s) being monitored, or where shown on the drawings. All mounting hardware shall be provided. 4. The module shall supply the required power to operate the monitored device(s). 5. The module shall provide address setting means using rotary decimal or DIP switches. H. FA-161; Addressable Control Module: 1. Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. Device types as follows: 1) Blank = Refer to Plans 2) DH = Door Hold Open 3) PD = Hold Open Override 2. Relay that represents an addressable control point used primarily for the control of auxiliary devices. Contractor to provide additional child relay(s), as required, rated for the electrical load being controlled (Contractor to match voltage, amps, etc.). 3. Relay shall connect directly to an SLC loop and receive power from a separate 24 VDC circuit. 4. The relay shall be mounted in an enclosure located in an accessible service location as near as possible to the device(s) being controlled, unless otherwise shown on the drawings. All mounting hardware shall be provided. 5. The relay shall supply 24 VDC power to the device(s) being controlled, unless otherwise indicated on the drawings. I. FA-280; Isolation Module: 1. Provide fault isolation modules or isolator detector base capable of isolating and removing the fault from Class A or Class X addressable loop data circuits while allowing the remaining data loop to continue operation. Provide a minimum of two isolation modules or bases and between every 15 devices. 2.6 NOTIFICATION APPLIANCE DEVICES A. Combination Devices: Subscripts identify combination type devices when applicable. Contractor shall provide the combination device or provide multiple device(s) to meet the functionality when the manufacturer does not offer the required functionality with a single device. 1143 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 15 FIRE ALARM AND DETECTION SYSTEMS B. Notification Appliance Device(s): 1. Subscripts: Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. Device types as follows: 1) W = Weather Proof 2) WG = Wire guard is required 3) Candela Ratings: a) ## = 15 Candela; 30 Candela; 75 Candela; 110 Candela; 177 Candela. b) CD = NICET designer shall select Candela rating as required to provide full coverage of the space. C. Notification Device(s): 1. Wall Mounted: Red housing with white lettering or pictogram. 2. Ceiling Mounted: Red housing with white lettering or pictogram. D. FA-200; Visual Alarm Devices: 1. Wall or ceiling mounted, refer to plans. 2. High intensity (Candela rating as scheduled on the drawings) xenon strobe or equivalent under a lens. Candela rating shall be visible from exterior of the device. 3. The maximum pulse duration shall be 0.2 seconds with a maximum duty cycle of 40%. The flash rate shall be 1 Hz. Where more than two strobes are visible from any one location, the fire alarm visual devices shall be synchronized. 4. Device, housing, and backbox shall be UL listed for fire alarm/emergency applications. 5. (W) Weatherproof Visual Notification Device: High intensity strobe, square housing, 75 Candela rating, suitable for wet locations. Provide with weatherproof back box. a. Mounting: Semi-flush wall. b. Conduit shall not be exposed. E. FA-210; Audio Horn Alarm Devices: 1. Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. 2. Device types as follows: a. M = Mini-Horn 3. Wall or ceiling mounted, refer to plans. 4. Sound Rating: 85 dB at 10 feet. Sound levels for alarm signals shall not exceed 120 dBA in the occupied area. 1144 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 16 FIRE ALARM AND DETECTION SYSTEMS 5. Device shall be capable of a high and low dB level setting. Unless noted otherwise, the device shall be set to the high setting at building completion. 6. Device, housing, and backbox shall be UL listed for fire alarm/emergency applications. 7. (M) Mini-Horn Audio Notification Device: Electronic horn. a. Mounting: single-gang flush wall. F. FA-211; Combination Audio Horn and Visual Alarm Device: 1. Wall or ceiling mounted, refer to plans. 2. Combine audio and visual components into a single device. Refer to the corresponding paragraphs above for requirements of each component. 3. (W) Weatherproof Audio/Visual Notification Device: Electronic horn with high intensity strobe, square housing, 75 Candela, suitable for wet locations. Provide with weatherproof back box. a. Mounting: Semi-flush wall. b. Conduit shall not be exposed. 2.7 DOOR HOLD-OPEN DEVICES A. FA-270; Electromagnetic Door Holder Devices: 1. Surface wall mounted. 2. Voltage: 24VDC. 3. Holding force shall be 25 pounds minimum. 4. Provide fail-safe operation; power failure releases door. 5. Provide self-adjusting swivel catch plate with pivot points to adjust to door alignment changes. 6. Provide all hardware and wiring needed to accommodate the complete functioning door holder installation. 7. Ensure that the door hardware and trim projections are compatible with total projection of door release. 8. Provide firm anchoring for the electromagnet, such that the mounting box and device will not move independently from the wall or floor they are mounted to. This device and mounting will function as a doorstop and hold the force of the door closer mechanism. 9. Follow manufacturer's recommended installation and location instructions unless noted otherwise. 10. Electromagnetic door holder devices, housing, and back box shall be UL listed. 2.8 ELEVATOR SHAFT DAMPER CONTROL A. Smoke detectors in the hoistway or elevator lobbies shall open the elevator hoistway vent automatic damper upon detection of smoke. B. FA-253: Hoistway Damper (Elevator Shaft Damper): 1145 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 17 FIRE ALARM AND DETECTION SYSTEMS 1. Motorized type, 24VDC, furnished and installed by MC. Fire Alarm control and power connections by EC. A subscript is used to identify a hoistway damper with a specific elevator or bank of elevators. C. FA-253: Hoistway damper switch for manual control of elevator shaft damper. 2-position selector switch for open/close control, maintained operator, NEMA ICS 5-1 contact block. Provide normally open contact for fire alarm interface. Nameplate shall identify associated elevator and open/close damper position. Flush mount enclosure provided by fire alarm vendor to match control panel. 1. Manufacturers: a. Allen Bradley 800T-H2A b. Square D 2.9 NOTIFICATION APPLIANCE CIRCUIT PANEL (NAC) A. As shown on the plans or as a Contractor's option if not shown, furnish and install NAC extender panels as necessary to provide remote power supply for notification appliance circuits (NAC). Contractor shall indicate quantity and locations of each NAC on the shop drawing submittals. B. Each NAC shall be self-contained remote power supply with batteries, and battery charger mounted in a surface lockable cabinet. Battery capacity shall be sufficient for operation for 24 hours in a non-alarm state followed by alarm for 15 minutes, plus 25% spare capacity for future devices. Each NAC provides a minimum of up to 4 outputs, 2A continuous, or 6A full load total capacity. C. Power for each NAC shall be from a local 120 VAC emergency circuit. Provide two #12 conductors and one #12 ground in 1/2" conduit to each NAC from a dedicated 20A/1P circuit breaker with a red handle and a manufacturer's standard handle lock-on device. Coordinate panel and circuit number with the Architect/Engineer prior to installation. D. NAC extender panels may be installed only where shown on drawings. E. Mounting: Flush. 2.10 ANNUNCIATION A. FAA; Remote LCD Annunciators: 1. Auxiliary annunciators shall indicate alarm and trouble conditions visually and audibly as shown on the drawings. Provide local TROUBLE ACKNOWLEDGE, TEST, and ALARM SILENCE capability. Minimum 80-character display. 2. Communications and power to the annunciators shall be supervised. The annunciator shall receive power from the fire alarm control panel. 3. A single key switch shall enable all switches on the annunciator. 4. Mounting: Flush. 1146 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 18 FIRE ALARM AND DETECTION SYSTEMS B. FA-242; Fire Alarm Remote Indicator and Test Switch: 1. Red LED type. 2. Key switch test selector. 3. Mounts flush to a single gang box. 2.11 CONNECTIONS TO AUXILIARY DEVICES PROVIDED BY OTHERS A. FA-250; Smoke Damper and Fire/Smoke Damper Controller: 1. Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. 2. Device types as follows: a. # = Indicates equipment system associated with smoke or fire/smoke damper. 3. Motorized type, 24 VDC, furnished and installed by MC. A subscript is used to identify the device with a specific air handler or zone for its sequence of operation. 4. The EC provides: a. Fire alarm control and power connections by EC. b. Fire alarm addressable control module (FA-161) located within 5 feet of smoke damper. c. Smoke Detection, selected by NICET designer based on duct size, ventilation airflow, and specific field conditions. Detector shall be mounted within 5 feet of smoke damper. Approved options include: 1) Smoke Detector (FA-120) (ID) In Duct Detector. In-duct smoke detector in ducts less than 18". Detector shall be listed for use in HVAC ductwork. 2) Duct Smoke Detector FA-122. Sampling type duct detector [FA-122] in ducts 18" and larger. d. Remote indicator[ FA-241] or Remote Indicator with test switch[ FA-242] mounted in visible location. e. The smoke damper shall close upon activation of the detector, and a supervisory signal shall be sent to the fire alarm control panel. Refer to the Fire Alarm Operation Matrix and these specifications for complete requirements. 5. Provide an enclosure and equipment for interface of dampers with the fire alarm system and temperature control system. Refer to drawings for layout, wiring and components. B. FA-260; Flow Switch: 1. (FA-260) Connection to flow switch to monitor fire protection flow switch or discharge output contacts. Normally open dry contacts for fire alarm interface. Furnished and installed and MC; wired by EC. 1147 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 19 FIRE ALARM AND DETECTION SYSTEMS 2. Provide a dedicated monitor switch for each sprinkler flow switch. C. FA-261; Tamper / Monitor Switch: 1. (FA-261) Connection to monitor switch to monitor fire protection system supervisory switches or output contacts. Normally open dry contacts for fire alarm interface. Furnished and installed by MC; wired by EC. 2. Tamper switches in the same room or system may be monitored by a single monitor switch when shown grouped on the plans. 3. Subscripts: Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. 4. Device types as follows: a. Blank = Refer to Plans b. PIV = Post Indicator Valve 5. (PIV) Post Indicator Valve. Connection to post indicator valve for sprinkler system supervisory notification. Normally open dry contacts for fire alarm interface. Furnished and installed by MC; wired by EC. Provide surge protection device as recommended by the fire alarm system manufacturer on line entering/leaving the facility. D. FA-263; Electronic Bell: 1. Electronic bell for sprinkler alarm, electro-mechanical type, 120 VAC. Furnished and installed by MC. Fire alarm control and power connections by EC. E. FA-271; Door Hold Device: 1. Subscript: Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. DH = Door Hold Open b. PD = Hold Open Override 2. (BLANK) Integral with door hardware 24 VDC. Furnished and installed by GC. Fire alarm control and power connections by EC. 3. (PD) Hold open override connection to GC-provided power door operator. EC shall intercept the hold open switch wiring (unless specific contacts for this purpose are provided on the door) and connect addressable relay to override this switch and allow the door to close. All modifications to the power door operator shall be coordinated with the GC. F. FA-160; Knox Box Monitor: 1. Subscript: Subscripts are used to define the device type, installation, and identify the device with a specific sequence of operation. a. KB = Knox Box 1148 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 20 FIRE ALARM AND DETECTION SYSTEMS 2. Monitored Knox box furnished and installed by GC. Provide addressable monitor module (FA-160) for Knox box monitoring. Refer to architectural plans for requirements and location. 2.12 WIRING A. Fire alarm wiring/cabling shall be furnished and installed by the Contractor in accordance with the manufacturer's recommendations and pursuant to National Fire Codes. Cabling shall be UL listed and labeled as complying with the Electrical Code for power-limited fire alarm signal service. B. Fire Alarm Cable: 1. Manufacturers: a. Comtran Corp. b. Helix/HiTemp Cables, Inc. c. Rockbestos-Suprenant Cable Corp. d. West Penn Wire/CDT. e. Radix. PART 3 - EXECUTION 3.1 SEQUENCES OF FIRE ALARM OPERATION A. General: 1. Refer to the Fire Alarm Sequence Of Operations on the drawings for basic requirements and system operation. 2. The GUI/graphic annunciator shall display audible and visual alarms. The device activated shall be immediately displayed on a CAD floor plan at approximately 1/8" scale. Visual indication shall further indicate the device by utilizing an easily recognized color change of the symbol. The use of flashing symbols is encouraged. 3. All system output programs assigned via control-by-event equations to be activated by the particular point in alarm shall be executed, and the associated system outputs (alarm notification appliances and/or relays) shall be activated. B. Panel/Annunciator Alarm, Trouble, Supervisory Indication: 1. Appropriate system Alarm, Trouble, or Supervisory LED shall flash at the control panel, transponder, and annunciator locations. 2. A local signal in the control panel shall sound. 3. The LCD display shall indicate all information associated with the condition, including the name of the item, type of device and its location within the protected premises. 4. Printing and history storage equipment shall log the information associated with the fire alarm control panel (FAP) condition, along with the time and date. 5. Transmit the appropriate signal (supervisory, trouble, alarm) to the central station via the digital communicator. 1149 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 21 FIRE ALARM AND DETECTION SYSTEMS 6. Transmit the appropriate signal (supervisory, trouble, alarm) to the building automation system via addressable relays tied to contact monitors on the system. C. Audible Alarms Sequence: 1. Audible alarms throughout the building shall sound. 2. Audible alarms within the floor or fire/smoke compartment where the emergency signal originated and in adjacent areas shall sound. D. Visual Alarms Sequence: 1. Visual alarms throughout the building shall flash. 2. Visual alarms within the floor or fire/smoke compartment where the emergency signal originated and in adjacent areas shall flash. E. Fire Protection Electric Sprinkler Bell Sequence: 1. The fire alarm shall utilize an addressable relay to energize the electric sprinkler bell upon activation of the flow switch. F. Smoke Damper Control Sequence: 1. The fire alarm system shall utilize an addressable relay to open the power connection to smoke or fire/smoke dampers and allow them to close. Coordinate other requirements with damper installer. 2. Where a damper is in a main air duct, where closure of that single damper will entirely block airflow in the duct system, the smoke damper sequence shall also initiate the AHU and mechanical fan shutdown sequence for the affected unit. 3. The AHU and mechanical fan shutdown sequence shall be initiated only when ALL the dampers associated with that unit or mechanical fan are closed. Otherwise, the AHU or mechanical fan shall continue to serve other areas. 4. Smoke and fire/smoke dampers located in branch ductwork shall be closed individually or in groups, as identified on the plans. 5. All smoke and fire/smoke dampers shall be closed throughout the building. G. AHU and Mechanical Fan Shutdown Sequence: 1. The fire alarm system shall utilize addressable relays to de-energize all AHU motor controllers and mechanical fans. Coordinate other requirements with HVAC installer. 2. The fire alarm system shall directly shut down the AHU or mechanical fan through the local HVAC control device (i.e., variable frequency drive or motor starter). 3. Where a facility has more than one AHU or mechanical fan, each shall be shutdown individually based on input from initiation devices in the area served by the unit or designated for each air distribution system. 4. All AHUs and mechanical fans shall be shutdown simultaneously throughout the building. 1150 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 22 FIRE ALARM AND DETECTION SYSTEMS H. Fire Door Release Sequence: 1. The fire alarm system shall utilize an addressable relay to signal the fire door or curtain to close. Once the alarm is cleared, the addressable relay shall allow the door to open. 2. Where a facility has more than one fire door, each shall release individually based on input from initiation devices in the vicinity of each door and noted specifically for door closure. I. Door Holder Release Sequence: 1. The fire alarm system shall utilize an addressable relay to open the power connection to integral and magnetic door holders. 2. The fire alarm system shall utilize an addressable relay to open the 'hold' switch circuitry, integral to the power door. 3. Door holders shall release individually based on initiation devices in the vicinity of the door and noted specifically for door closure. 4. All door holders throughout the building shall release simultaneously. J. Elevator Recall Sequence: 1. Elevator recall sequences shall meet the requirements of ASME/ANSI A17.1 and NFPA 72. 2. Upon signal from a smoke detector in the machine room, hoistway, or any elevator lobby other than the "designated level" the fire alarm shall utilize an addressable relay to signal the elevator to recall to the designated level as determined by the Authority Having Jurisdiction. 3. Upon signal from a smoke detector in the elevator lobby of the "designated level," the fire alarm system shall utilize an addressable relay to signal the elevator to recall to the "alternate level" as determined by the Authority Having Jurisdiction. 4. All elevators, throughout the building, shall be recalled simultaneously. 5. All elevators that share the same hoistway, machine room or lobby shall be recalled simultaneously. Elevators served by different machine rooms, hoistways and lobbies shall continue to operate. K. Elevator Shutdown Sequence: 1. Elevator shutdown shall meet the requirements of ASME/ANSI A17.1. 2. All elevators that share the same hoistway, machine room, or lobby shall be shut down simultaneously. Elevators served by different machine rooms, hoistways, and lobbies shall continue to operate. 3. The fire alarm system shall utilize an addressable relay to energize the shunt trip of the main elevator breaker, disconnecting power to the elevator. 4. The fire alarm system shall utilize an addressable relay to de-energize the relay on the elevator power module, disconnecting power to the elevator. L. Elevator Hoistway Damper Sequence: 1. Provide control of each elevator shaft damper in accordance with ASME/ANSI A17.1, as indicated on the drawings. 1151 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 23 FIRE ALARM AND DETECTION SYSTEMS 2. The fire alarm system shall utilize an addressable relay to open or close the elevator shaft vent damper from a manually operated switch. 3. The hoistway vent damper shall open automatically when the hoistway or elevator lobby smoke detectors activate. 4. When the damper is in the open position, the fire alarm system shall provide status indication (e.g., "Elevator 2-3 damper open") on the fire alarm panels and annunciators. Once the damper is closed, the status indication shall automatically return to the normal state. M. Ceiling Fan Shutdown Sequence: 1. The fire alarm shall utilize an addressable relay to de-energize the ventilation ceiling fan and controller. Coordinate the connection to the fan shutdown contacts on the fan controller or interrupt the power circuit with the addressable relay. N. Access Control Override Sequence: 1. The fire alarm shall use addressable output relay(s) to signal the access control panel. 2. Refer to the access control specifications for requirement upon fire alarm signal. The fire alarm shall initiate an override of delayed egress doors. 3.2 INSTALLATION A. Install system in accordance with manufacturer's instructions and referenced codes. B. Fire Alarm Control Panel: 1. Install the control panel where shown on the drawings. 2. All expansion compartments, if required, shall be located at the control panel. 3. The fire alarm voice prerecorded messages shall be verified by the Contractor, as approved by the Owner, prior to the shop drawing submittal process. C. Devices: 1. General: a. All ceiling-mounted devices shall be located where shown on the reflected floor plans. If not shown on the reflected floor drawings, the devices shall be installed in the relative locations shown on the floor drawings in a neat and uniform pattern. b. All devices shall be coordinated with luminaires, diffusers, sprinkler heads, piping and other obstructions to maintain a neat and operable installation. Mounting locations and spacing shall not exceed the requirements of NFPA 72. c. Where the devices are to be installed in a grid type ceiling system, the detectors shall be centered in the ceiling tile. 1152 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 24 FIRE ALARM AND DETECTION SYSTEMS d. The location of all fire alarm devices shall be coordinated with other devices mounted in the proximity. Where a conflict arises with other items or with architectural elements that will not allow the device to be mounted at the location or height shown, the Contractor shall adjust location of device so that new location meets all requirements in NFPA 72 and all applicable building codes. 2. Per the requirements of NFPA, detector heads shall not be installed until after the final construction cleaning unless required by the local Authority Having Jurisdiction (AHJ). If detector heads must be installed prior to final cleaning (for partial occupancy, to monitor finished areas or as otherwise required by the AHJ), they shall not be installed until after the fire alarm panel is installed, with wires terminated, ready for operation. Any detector head installed prior to the final construction cleaning shall be removed and cleaned prior to closeout. 3. Protection of Fire Alarm System: a. A smoke detector shall be installed within the vicinity of the main fire alarm panel and every NAC extender panel per NFPA 72. A heat detector may be substituted when a smoke detector is not appropriate for the environment of installation. 4. Analog Smoke and Heat Detectors: a. In elevator shafts and elevator equipment rooms, provide a heat detector for elevator shutdown within 2' of every sprinkler head. Coordinate with fire protection contractor. 5. Duct-type Analog Smoke Detectors: a. Duct-type analog smoke detectors shall be installed on the duct where shown on the drawings and details. The sampling tubes shall be installed in the respective duct at the approximate location where shown on the electrical drawings to meet the operation requirements of the system. b. All detectors shall be accessible. c. Duct-type detectors shall be installed according to the manufacturer's instructions. 6. In-Duct Analog Smoke Detectors: a. In-duct analog smoke detectors shall be installed in the duct where shown on the drawings and details. The devices shall be installed in the respective duct at the approximate location where shown on the electrical drawings to meet the operation requirements of the system. b. All detectors shall be accessible. 7. Heat Detector, Linear Wire Type: a. Install detection wire within 20 inches of the underside of building roof, floor, or as recommended by the manufacturer. b. The protected area shall not exceed 4,000 square feet per zone. Provide a separate zone for areas divided by fire/smoke rated walls. 1153 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 25 FIRE ALARM AND DETECTION SYSTEMS 8. Manual Pull Stations: a. Stations shall be located where shown and at the height noted on the drawings. 9. Addressable Relays and Monitor Modules: a. Modules shall be located as near to the respective monitor or control devices as possible, unless otherwise indicated on the drawings. b. All modules shall be mounted in or on a junction box in an accessible location. c. Where not visible from a floor standing position, a remote indicator shall be installed to allow inspection of the device status from a local floor standing location. 10. SLC Loop Isolation Modules: a. Isolation modules shall be installed to limit the number of addressable devices that are incapacitated by a circuit fault. b. Install all Isolation Modules within the fire alarm control panel, unless otherwise indicated on the drawings. 11. Notification Appliance Devices: a. Devices shall be located where shown on the drawings. b. Wall-mounted audio, visual and audio/visual alarm devices shall be mounted as denoted on the drawings. c. Where ceiling mounted visual alarm devices or combination audio/visual alarm devices are shown where the ceiling is greater than 30'-0" high, they shall be stem mounted so that the entire unit is below 30'-0". This does not apply to audio-only alarm devices. D. Wiring: 1. Fire alarm wiring/cabling shall be provided by the Contractor in accordance with the manufacturer's recommendations and pursuant to National Fire Codes. 2. Wiring shall be installed in conduit. Refer to Identification Section 26 05 13 for color and identification requirements. 3. Wiring shall be installed in conduit from device to above accessible ceilings. Exposed plenum-rated cable (FPLP) shall be used above accessible ceilings supported every 4 feet or run in cable trays (if applicable) maintaining a minimum of 5-inches clearance from all lighting ballasts. Fire alarm cabling shall not be installed in the same bridle rings or cable trays designated for the cabling of other systems. 4. All junction boxes with SLC and NAC circuits shall be identified on cover. Refer to Identification Section 26 05 13 for color and identification requirements. 1154 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 26 FIRE ALARM AND DETECTION SYSTEMS 5. Partial evacuation or relocation of occupants is the standard operating procedure for this facility in the event of an alarm. Therefore, all notification appliance circuits (NAC), including circuits serving NAC extender panels (NAC) and other network communication circuits, must be installed and protected in accordance with the "circuit survivability" requirements described in NFPA 72. Contractor shall maintain the following: a. NACs serving separate evacuation signaling zones shall be routed separately such that they are no less than 4 feet apart when run horizontally and 1 foot apart when run vertically. They may come simultaneously only within 10 feet of the control panel. b. NACs passing through other evacuation signaling zone(s) shall be installed in conduit and routed through the 2-hour fire-rated chase(s) or enclosure(s) identified on the drawings. c. NACs passing through other evacuation signaling zone(s) shall be Electrical Code classified CIC cable (Fire Alarm Circuit Integrity) installed in conduit. Provide CIC cable meeting UL requirements for 2-hour listing. 1) The CIC cable system shall be installed in a conduit system meeting all requirements of its UL-listed installation system (conduit, boxes, connectors, etc.). 6. Fire Alarm Power Branch Circuits: Building wiring as specified in Section 26 05 13. 7. Notification Appliance Circuits shall provide the features listed below. These requirements may require separate circuits for visual and audible devices. a. Fire alarm temporal audible notification for all audio appliances. b. Synchronization of all visual devices where two or more devices are visible from the same location. c. Ability to silence audible alarm while maintaining visual device operation. d. Emergency communication alert and textual visible appliance notification. 8. Notification Appliance Circuits shall not span floors or smoke compartments. Refer to architectural drawings for smoke compartments. 9. Signal line circuits connecting devices shall not span floors or 2-hour smoke compartments. 10. Signal line circuits connecting devices shall be provided with an isolation module at each floor separation or as otherwise shown on the drawings. 11. No wiring other than that directly associated with fire alarm detection, alarm or auxiliary fire protection functions shall be in fire alarm conduits. Wiring splices shall be avoided to the extent possible, and if needed, they shall be made only in junction boxes, and enclosed by plastic wire nut type connectors. Transposing or changing color coding of wires shall not be permitted. All conductors in conduit containing more than one wire shall be labeled on each end, in all junction boxes, and at each device with "E-Z Markers" or equivalent. Conductors in cabinets shall be carefully formed and harnessed so that each drops off directly opposite to its terminal. Cabinet terminals shall be numbered and coded, and no unterminated conductors are permitted in cabinets or control panels. All controls, function switches, etc. shall be clearly labeled on all equipment panels. 1155 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 27 FIRE ALARM AND DETECTION SYSTEMS E. Fire Alarm Cabling Color Code: Provide circuit conductors with insulation color coding as follows, or using colored tape at each conductor termination and in each junction box. 1. Power Branch Circuit Conductors: In accordance with Section 26 05 53. 2. Signaling Line Circuit: Overall red jacket with black and red conductors. 3. DC Power Supply Circuit: Overall red jacket with violet and brown conductors. 4. Notification Appliance Circuit: Overall red jacket with blue and white conductors. 5. Door Release Circuit: Gray conductors. 6. Central Station Trip Circuit: Orange conductors. 7. Central Station Fire Alarm Loop: Black and white conductors. F. Devices surface mounted in finished areas shall be mounted on surface backboxes furnished by fire alarm equipment supplier. Backboxes shall be painted to match device, shall be the same shape and size as the device shall not have visible knockouts. G. Make conduit and wiring connections to door release devices, sprinkler flow and pressure switches, sprinkler valve monitor switches, fire suppression system control panels, duct analog smoke detectors and all other system devices shown or noted on the Contract Documents or required in the manufacturer's product data and shop drawings. 3.3 FIELD QUALITY CONTROL A. Field inspection and testing will be performed under provisions of Section 26 05 00. B. Test in accordance with NFPA 72, Chapter 14 and local fire department requirements. Submit documentation with O & M manuals in accordance with Section 14.6 of the Code. C. Contractor shall test and adjust the fire alarm system as follows: 1. Speaker taps shall be adjusted to the lowest tap setting which achieves a sound level higher than or equal to the greatest of the following: a. 70dBA. b. 15 dBA above ambient levels as indicated in NFPA 72 Table A.18.4.3. c. 15 dBA above measured ambient. 5 dBA above the maximum measured sound level with duration of more than 60 seconds. d. As specified on the drawings. 2. Sound level measurement procedure shall meet the following requirements: a. All measurements shall use the 'A' weighted, dBA, sound measurement scale. b. All measurements shall be taken after furnishings, wall coverings and floor coverings are in place. c. All measurements shall be taken after fixed equipment (HVAC units, etc.) producing ambient noise is installed and is in operation. 1156 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 28 FIRE ALARM AND DETECTION SYSTEMS d. Final ambient sound measurements shall be taken during occupancy and the units shall be re-adjusted at that time, if necessary. e. All sound level measurements shall be taken at a height of 5' above the finished floor level. f. Measurements shall be taken in every unique room. If there are multiple rooms, which have the identical dimensions and function, 10%, or a minimum of 2 rooms shall be tested. The results from the rooms tested shall be averaged and the remaining rooms may be adjusted per the average. g. Measurements shall be taken on a 20' x 20' grid and the results for all points taken shall be averaged. If the room is smaller than 20' x 20' a minimum of two measurements are required. h. Measurements shall be taken halfway between speakers or halfway between a speaker and the wall. No measurements shall be taken at the extreme edges of the room, nor directly under speakers. D. Additionally, test the voice alarm communication system intelligibility per IEC 60849: 1. The following acoustically distinguishable spaces shall be tested: All unique rooms shall be tested. If there are multiple rooms with the identical dimensions and function, 10%, or a minimum of two (2) rooms, shall be tested. The results from the rooms tested shall be averaged, and the remaining rooms may be adjusted per the average. 2. Utilize equipment designed to test per IEC 60849 per the equipment manufacturer's instructions. This equipment includes a signal generator, which is input to the fire alarm system and a portable measurement device. This equipment is available from Simplex Grinnell or Gold Line. 3. Testing equipment that can simulate 'crowd babble' shall be used in rooms with occupancy of greater than 200. 4. Wide-area notification intelligibility shall be tested in acoustically distinguishable spaces and areas as designated by the Owner. 5. When testing for intelligibility, the quantity and location of the measurement points shall be the same as the points used for measurement of dBA level. 6. Provide a room by room report, showing the average dBA level and STI for each room tested, the number and location of. The report shall be presented to the Architect/Engineer in an Excel .xls file. 3.4 MANUFACTURER'S FIELD SERVICES A. Provide manufacturer's field services under provisions of Section 26 05 00. B. Include services of the manufacturer's software programmer to write initial custom-user program (for Color Graphics Annunciation System). C. Include services of certified technician to supervise installation, adjustments, final connections, and system testing. 1157 MOORPARK CITY HALL 05/30/2023 TENANT IMPROVEMENT MOORPARK, CALIFORNIA 28 31 00 - 29 FIRE ALARM AND DETECTION SYSTEMS D. Note that room numbers depicted on the architectural/engineering drawings will not necessarily reflect the actual room (signage) numbers that the Owner selects. The Contractor and fire alarm manufacturer shall coordinate the actual room numbers as the Owner directs to identify each device. This list shall be a part of the floor plan record drawing to be turned in at the project closeout. E. Include the services to train up to three of the Owner's staff in operation, maintenance, and programming of the fire alarm system at the manufacturer's factory. Airfare and lodging expenses for the Owner's staff will be by the Owner. F. System Occupancy Adjustments: When requested by Owner within 12 months of date of Substantial Completion, provide on-site system adjustments to suit actual occupied conditions. For this purpose, provide up to two (2) site visits, 4 hours each visit, outside normal occupancy hours. 3.5 SYSTEM TRAINING A. System training shall be performed under provisions of Section 26 05 00. B. Minimum on-site training times shall be: 1. System Operators: One (1) day. 2. GUI Operation and Editing: One (1) day. END OF SECTION 28 31 00 1158 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 31 11 00 - 1 Site Clearing and Grubbing SECTION 31 11 00 SITE CLEARING AND GRUBBING PART 1 - GENERAL 1.01 SUMMARY A. Clearing vegetation, debris, trash and other materials within limits indicated. B. Grubbing of vegetation within limits indicated. 1.02 RELATED SECTIONS A. Section 31 31 19 Vegetation Control B. Section 32 93 01 Tree Pruning 1.03 RELATED DOCUMENTS A. California Building Code: Site Work, Demolition and Construction. PART 2 - PRODUCTS 2.01 NOT USED PART 3 - EXECUTION 3.01 PREPARATION A. Locate and clearly flag vegetation to remain or to be relocated. 3.02 RESTORATION A. Repair or replace vegetation indicated to remain that is damaged by construction operations, as directed by the Owner. B. Employ a qualified arborist, licensed in jurisdiction where the Project is located, to submit details of proposed repairs and to repair damage to shrubs. 3.03 CLEARING AND GRUBBING A. Remove obstructions, trees, shrubs, grass, and other vegetation to permit installation of new construction. Removal includes digging out stumps and obstructions and grubbing roots. B. Remove trash, debris, logs, concrete, masonry and other waste materials. C. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated. D. Completely remove stumps, roots, obstructions, and debris extending to a depth of 18-inches below subgrade. 1159 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 31 11 00 - 2 Site Clearing and Grubbing E. Use only hand methods for grubbing within drip line of remaining trees. END OF SECTION 1160 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 31 31 19 - 1 Vegetation Control SECTION 31 31 19 VEGETATION CONTROL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Application of soil sterilant on subgrades for roadways, driveways, parking areas, walks, paths, trails, and any other site improvements. 1.02 RELATED DOCUMENTS A. CAL/OSHA, Title 8. 1.03 SUBMITTALS A. Follow submittal procedures outlined in Section 01 31 00 – Submittal Procedures. PART 2 - PRODUCTS 2.01 SOIL STERILANT A. Commercial chemical for weed control, registered by EPA. Provide granular, liquid, or wet-able powder form. PART 3 - EXECUTION 3.01 SOIL STERILIZATION A. Apply soil sterilant to newly installed site improvements such as beneath asphalt concrete pavement, brick pavement, concrete pavement and at grade concrete slabs, including sidewalks, curbs, and gutters. Also, apply soil sterilant below newly constructed expansion and control joints and at areas where pipes, ducts or other features penetrate slabs. B. Apply soil sterilant uniformly and at the rates recommended by the manufacturer. C. Apply soil sterilant to prepared subgrade, or after installation of aggregate base as recommended by the manufacturer. 3.02 DISPOSAL A. Lawfully dispose of all unsuitable and excess or surplus material off-site at no cost to the Owner. END OF SECTION 1161 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 31 31 19 - 2 Vegetation Control 1162 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 31 22 00 - 1 Site Clearing SECTION 31 10 00 SITE CLEARING PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1.. Removal of concrete and bituminous surfaces. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 31 2200 - Grading. 3. Section 31 2313 - Excavation and Fill. 4. Section 31 2316 - Excavation and Fill for Pavement. 5. Section 31 2326 - Base Course. 1.02 SUBMITTALS A. Shop Drawings: Submit site plan indicating extent of site clearing. 1.03 QUALITY ASSURANCE A. Comply with Standard Specifications for Public Works Construction, current edition, as a minimum requirement. PART 2 - EXECUTION 2.01 CONCRETE AND BITUMINOUS SURFACING REMOVAL A. Break up and completely remove existing concrete surfacing, curbs, gutters, walks and bituminous surfacing to indicated limits. Cutting shall be performed to a neat and even line with proper tools or a concrete cutting saw. Minimum depth of cut shall be 1 1/2-inch, unless otherwise indicated. Remove concrete broken beyond the indicated limits to the nearest joint or score line and replace with new concrete to match existing. 1163 MOORPARK CITY HALL TENANT IMPROVEMENT 05/15/2023 MOORPARK, CALIFORNIA 31 22 00 - 1 Site Clearing 2.02 CLEANUP A. Remove rubbish, debris and waste materials and legally dispose of per 01 74 10. END OF SECTION 1164 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA SECTION 31 22 00 GRADING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. General exterior grading, cutting and filling, including grading for building area, paving, planting areas, banks and hillsides. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 31 1000 - Site Clearing. 3. Section 31 2313 - Excavation and Fill. 4. Section 31 2316 - Excavation and Fill for Pavement. 5. Section 31 2326 - Base Course. 1.2 PROJECT REQUIREMENTS A. General: 1. Fees: Pay as required by authorities having jurisdiction over the area. 2. Bonds: Post as required by authorities having jurisdiction over the area. 3. Haul Routes and Restrictions: Comply with requirements of authorities having jurisdiction over the area. 4. Before grading, contact Underground Service Alert of Southern California (USASC) for information on public buried utilities and pipelines. Retain the services of an underground utility locator for on- site utilities. PART 2 - PRODUCTS 31 22 00 - 1 Grading 1165 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA 2.1 MATERIALS A. Materials shall conform to requirements specified in this and related sections. PART 3 - EXECUTION 3.1 PREPARATION A. Protect and maintain installed stakes until their removal is required for the Work. Provide replacement grade or location stakes lost or disturbed. B. Install grade stakes and compare to indicated grades. If discrepancies are found between existing grades and grades indicated on Drawings, do not proceed until discrepancies are resolved. 3.2 ROUGH AND FINE GRADING A. Rough grade area sufficiently high to require cutting by fine grading: 1. Grade area for bituminous surfacing and other paving to the indicated grades, equal to the section of the indicated base and pavement. 2. Rough grade, fill and compact banks beyond indicated finish grades. Finish grade banks and slopes to indicated grades and specified soil densities. 3. Grade Only Areas: In areas not indicated to receive pavement, rough grade to approximate finish grades and then scarify, moisten and roll to obtain required density and indicated finish grades. 4. Tolerances: Finish grades shall be within a tolerance of 0.05 inch per foot above or below grades indicated. Provide an average grade as indicated. B. Base or Subgrade: 1. After subgrade has been constructed to approximate required grades, scarify to a depth of at least 12 inches: a. After scarifying, process loosened material to a finely divided condition and adjust moisture content to optimum condition by addition of water, addition and blending of dry suitable material, or by drying of existing material. 31 22 00 - 2 Grading 1166 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA b. Subgrade material shall be compacted by tamping, sheepsfoot rollers or pneumatic tire rollers. Required relative compaction shall be 90 percent minimum for the top 6 inches below subgrade. c. Install base course in accordance with Section 31 2326 - Base Course. 2. Tolerance of completed grades of base or subgrade shall not vary more than 0.03 inch per foot from grades indicated. Provide an average grade as indicated. 3.3 SHORING A. Provide shoring as necessary to properly and safely support earth sides of excavations, and existing curbs, sidewalks, gutter, drives and stairs, against movement and collapse. B. Design and Calculations: Provide in accordance with requirement of CalOHSA. C. Remove shoring upon completion of the Work of this section or when no longer needed unless required otherwise by authorities having jurisdiction. 3.4 EXCESS MATERIAL DISPOSAL A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. 3.5 PROTECTION A. Protect the Work of this section until Substantial Completion. END OF SECTION 31 22 00 - 3 Grading 1167 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 1 Excavation Fill SECTION 31 23 13 EXCAVATION AND FILL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating, filling, backfilling, and compacting for Project site pavement, planting areas, buildings, and other structures. 2. Trenches for utility lines such as storm drain and other utility appurtenances. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 31 1000 - Site Clearing. 3. Section 31 2200 - Grading. 4. Section 31 2326 - Base Course. 5. Section 32 1313 - Site Concrete Work. 6. Section 33 4000 - Storm Drainage Utilities. 1.2 PROJECT REQUIREMENTS A. Import and Export of Earth Materials: 1. Fees: Pay as required by authorities having jurisdiction over the area. 2. Bonds: Post as required by authorities having jurisdiction over the area. 3. Haul Routes and Restrictions: Comply with requirements of authorities having jurisdiction over the area. 1.3 SUBMITTALS A. Shoring calculations as required in Article 3.03 of this Section. 1.4 QUALITY ASSURANCE A. Comply with the Standard Specifications for Public Works Construction, current edition, except as modified herein. 1168 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 2 Excavation Fill 1.5 TESTING A. OWNER will retain a Geotechnical Engineer as an OWNER Consultant who will provide observations, tests, inspections and approvals identified in the Contract Documents as being responsibility of OWNER. B. Imported Soils: The Geotechnical Engineer will obtain initial product Sample for testing in accordance Article 3.05 of this Section. C. Minimum 72 hour notice shall be provided for testing and any specialized inspection services. D. If any testing, inspections and/or observations fail the requirements on the plans and within the specifications, contractor shall be responsible for fixing the work in a matter that meets the requirements of the specifications at no additional cost to the City. 1.6 PROJECT CONDITIONS A. Information on Drawings or in soil investigation report does not constitute a guarantee of accuracy or uniformity of soil conditions over the Project site. PART 2 - PRODUCTS 2.1 FILL AND BACKFILL MATERIALS A. Fill and backfill material shall be a granular material previously removed from excavation or imported fill material, free of clods and stones larger than 3 inches, (2½ inches for utility trenches) foreign materials, vegetable growths, sod, expansive soils, rubbish and debris. The city should be notified if imported fill materials will be required on-site. Material shall conform to these specified requirements and related sections. B. Fill material exhibiting a wide variation in consistency and moisture content shall be blended and aerated to stabilize and upgrade the material. C. Bedding material from trench bottom to one foot above the pipe: 1. Sand, gravel, crushed aggregate or native free-draining granular material providing a sand equivalent of at least 20 or a coefficient of permeability greater than 1.4 inches per hour. 2. Sand complying with the Specifications for cement concrete aggregates. 1169 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 3 Excavation Fill D. Brick rubble and broken concrete originating from the Project site shall be legally disposed of off the Project site No such material shall be imported from outside the Project site. E. Cement-sand slurry shall be provided with one sack of cement per cubic yard of the mixture. 2.02 BASE MATERIALS A. Concrete Slabs on Grade: Provide "Crushed Aggregate Base" as specified in Standard Specifications for Public Works Construction, Section 200 - Rock Materials, with 3/4 inch maximum size aggregates. Provide 3 inch thick base, unless noted otherwise. B. Bituminous Surfacing: Provide as indicated on Drawings and specified in Section 31 2326 Base Course. PART 3 - EXECUTION 3.01 GENERAL A. Before initiating intrusive activities, contact Underground Service Alert of Southern California (USA or Dig Alert) to obtain a Dig Alert ticket for location information on buried public and USA member utilities and pipelines at least 48-hours prior to beginning work. A copy of the Dig Alert ticket shall be forwarded to the OWNER. For on-site utilities, retain a state-licensed third party underground utility locating service. B. Where the Work includes a building extension or addition on an occupied Project site, perform Work in such a manner, and at such times, as not to disrupt performance of existing utility services to existing Project site facilities. Where an interruption is necessary, obtain review from the owner’s authorized representative before proceeding. C. Remove concrete or bituminous pavement to straight lines by saw cutting. 3.02 PROTECTION A. Protect and guard excavations against danger to life, limb, and property as required by, but not limited to, OSHA regulations. B. Protect existing improvements including landscaping against damage. Repair or replace damaged items at the expense of the Contractor, C. Protect existing utility services and distribution systems from damage or displacement. D. Remove conduits or pipes not in service, exposed during Work, unless a minimum cover of two feet is provided. Remove concrete, clay or other non- metallic pipe over 8 inches in diameter, unless otherwise indicated. 1170 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 4 Excavation Fill E. Shore, crib, or lag excavations and earthen banks as necessary to prevent cave in, erosion or gullying of sides. F. Provide excavations free from standing water by pumping, draining, or providing protection against water intrusion. If soil becomes soft, soggy, or saturated, excavate to firm undisturbed earth and fill as required. Slope adjacent grades away from excavations to minimize entry of water. 3.03 SHORING A. Provide shoring as necessary to properly and safely support earth sides of excavations, and existing curbs, sidewalks, gutter, and drives, against movement and collapse. B. Design and Calculations: Provide in accordance with requirement of governing Cal-OSHA requirements. C. Remove shoring upon completion of the Work of this Section or when no longer needed unless required otherwise by authorities having jurisdiction. 3.04 EXCAVATION A. Unclassified Excavations: Comply with the Standard Specifications for Public Works Construction, Section 300: "Earthwork", except as modified herein. B. Form sides of footings, pads, grade beams, and slab foundations, unless otherwise indicated. Provide excavations of sufficient size to permit installation and removal of forms and other required Work. C. Machine-drill excavation for round footings to size and depth indicated. Provide a collar or casing, or other adequate protection, to exclude dirt and debris. Protect excavations with plank covers until concrete is placed. D. Provide excavation bottoms level and free from loose material. Excavate to indicated or required elevations of undisturbed earth. E. Barricade trenches, ditches, pits, sumps, and similar Work outside the barricaded working area with chain link fence as specified in Section 01 5000 - Construction Facilities and Temporary Controls, and in accord with Cal-OSHA standards and requirements. F. Trenches over five feet in depth shall comply with the Construction Safety Orders of the California Division of Industrial Safety. G. Where indicated or required to excavate in lawn areas, protect adjoining lawn areas outside of the Work area. Replace or install removed sod upon completion of backfill by installing sod level with adjacent lawns. If installation of removed sod fails, furnish sod and install to match existing lawns. 1171 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 5 Excavation Fill H. For Structures: 1. Calculate excavation quantities based on elevations or depths indicated on Drawings. 2. Special preparation of bottom of excavated planes areas: Excavate areas shown on Drawings as bottom of excavated planes (B.E.P.), by excavating and filling to indicated grades and elevations. I. For Utilities: 1. Excavate trenches to required depth for utility lines, such as pipes and conduits with minimum allowance of 6 inches at the bottom and 12 inches at the sides for bedding or concrete encasement as indicated on Drawings. Grade bottom of trenches to a uniform smooth surface. Remove loose soil from the excavation before placing sand bedding or concrete encasement. 2. Do not install piping lengthwise under concrete walks without review by the ARCHITECT. 3. Do not excavate trenches parallel to footings closer than 18 inches from the face of the footing or below a plane having a downward slope of two horizontal to one vertical, from a line 9 inches above bottom of footings. a. Unless otherwise indicated on Drawings, depth of excavations outside buildings shall provide for a minimum coverage above top of piping, tank or conduit measured from the lowest adjoining finished grade, as follows: Steel Pipe 24 inches below finish grade Copper Water Tube 18 inches below finish grade Cast-Iron, Pressure Pipe 36 inches below finished grade Plastic Pipe (other than waste) 30 inches below finished grade Tanks or other structure 36 inches below finished grade Soil, sewer and storm drain minimum 18 inches below finished grade, and as required for proper pitch and traffic load. Install polypropylene sewer pipe with at least 24 inches of coverage. Irrigation Pipe: Non-pressure pipe - 12 inches, pressure pipe - 24 inches. b. Trench width shall provide space for fitting and joining. Excavate for piping bells and fittings, bell and spigot pipe and other fittings. 4. Where portions of existing structures, walks, paving, or other improvements are removed or cut for piping or conduit installation, replace the material with equal quality, finished to match adjoining 1172 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 6 Excavation Fill existing improvements. 5. Provide a minimum clear dimension of 2 inches from sides of wall excavation to outer surfaces of buried pipes or conduits placed in the same trench or outside surfaces of containers and tanks. 3.05 A. IMPORT/EXPORT OF MATERIALS Unclassified Fill and Compaction: Comply with the Standard Specifications for Public Works Construction, Section 300 - Earthwork, except as modified herein. Install and compact fill in layers not to exceed 6 inches in thickness. B. Provide fill materials as specified in Part 2- Products. If excavated materials from the Project site are not of required quality or sufficient quantity, import additional materials as necessary. Notify City prior to import. C. Imported fill materials shall be sampled by the Geotechnical Engineer, for compliance with the requirements of Part 2 of this Section. D. The Geotechnical Engineer, will submit the samples to an independent to owner approved testing laboratory for testing. E. Initial sampling and testing shall be performed before importing material to the Project site. Identify the location of the source site in addition to the address, name of the person and entity responsible for the source site. The Geotechnical Engineer, will obtain both the initial and additional samples from the identified site and submit samples for required testing. F. If the total quantity of import is determined to be less than 1000 yards, one sample shall be obtained and submitted for testing for each 100 cubic yards of imported material. G. The independent approved testing laboratory will perform the required tests and report results of tests noting if the tested material passed or failed such tests and will furnish copies to the Project Inspector, ARCHITECT, Owner’s Authorized Representative, CONTRACTOR, and others as required. Report shall state tests were conducted under the responsible charge of a licensed State of California professional engineer and the material was tested in accordance with applicable provisions of the Contract Documents, and California Building Code. Upon completion of the Work of this Section, the independent testing laboratory and Geotechnical Engineer will submit a verified report to the owner as required by the CBC. If failed tests. Contractor responsible for performing work in accordance with specifications at no additional cost to the City. H. Bills of lading or equivalent documentation will be submitted to the Project Inspector on a daily basis. 1173 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 7 Excavation Fill I. Upon completion of import operations, provide the Owner’s authorized representative a certification statement attesting that imported material has been obtained from the identified source site. 3.6 INSTALLATION OF MATERIALS A. Pavement: Fill or backfill materials shall be installed in horizontal layers of 6 inches, unless otherwise required. Each layer shall be evenly placed and moistened or aerated as necessary. Unless otherwise reviewed by the Geotechnical Engineer, each layer of fill material shall cover the length and width of the area to be filled before the next layer of material is installed. Top surface of each layer shall be installed to an approximate level with a crown or crossfall of at least 1 in 50, but not more than 1 in 20. Provide adequate drainage at all times during installation of the Work of this Section. B. Structures: 1. After concrete has been placed, forms removed, and concrete Work inspected, backfill excavations with earth to indicated or required grades. Backfill simultaneously on each side of walls or grade beams. Remove rubbish, debris and other waste materials from excavations before placing backfill. 2. Before placing backfill, adequately cure concrete and provide bracing, if required to stabilize structure. Remove bracing as backfill operation progresses. 3. Rigidly control the amount of water to be installed to provide optimum moisture content for type of fill material furnished. Do not over-saturate or compact by flooding or jetting. C. Utilities: 1. Do not install backfill until the Work of this Section has been inspected and tested. Do not furnish or install materials excavated from the Project site containing materials not permitted for backfill. 2. Backfill electrical or other excavated utility trenches areas within 24 hours after inspection by the Inspector of Record. 3. Install backfill in layers not exceeding 4 inches in thickness, except cement-sand slurry. 4. If materials excavated from the Project site are not permitted for trench backfill in paved areas, backfill trenches with a cement-sand slurry mix and notify the City before the work commence.. Install backfill to an elevation of the existing undisturbed grades plus one inch. 3.7 COMPACTING A. Each layer of fill material shall be compacted by tamping, sheepsfoot rollers, or pneumatic-tired rollers to provide specified relative compaction. At 1174 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 13 - 8 Excavation Fill inaccessible locations, provide specified compaction by manually held, operated and directed compaction equipment. B. Install and compact sand bedding to provide a uniform bearing under the full length of piping and conduits. C. Unless otherwise indicated, compact each layer of fill material to a relative compaction of at least ninety-five percent. D. When fill materials, or a combination of fill materials, are encountered or provided which develop densely packed surfaces as a result of installation or compacting operations, scarify each layer of compacted fill before installing the next succeeding layer. 3.8 INSPECTION AND TESTING A. The Geotechnical Engineer will inspect and test excavations, sample material quality for testing as set required in Part 2, and observe installation and compaction of fill materials. B. The Geotechnical Engineer will sample imported fill materials from their designated source and submit samples to the independent approved testing laboratory before delivery to the Project site. C. Installation of backfill shall be observed by the Geotechnical Engineer. D. The Geotechnical Engineer will inspect and test excavation Work before the installation of fill and other materials. E. Compaction: Test compaction in accordance with ASTM D1557, Method C. F. The Project Inspector will inspect foundation excavations when completed and ready for forms, after forms are in place, and before first placement of concrete. G. If any tests or inspections fail, contractor responsible for performing the work necessary to meet the requirements of the specs and plans at no additional cost to the City. 3.9 PROTECTION A. Protect the Work of this Section until Substantial Completion. 3.10 CLEANING A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. END OF SECTION 1175 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 16 - 1 Excavation Fill Paving SECTION 31 23 16 EXCAVATION AND FILL FOR PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating, backfill, and compacting for paved areas. 2. Installation of fill materials. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 31 1000 - Site Clearing. 3. Section 31 2200 - Grading. 4. Section 32 2326 - Base Course. 5. Section 32 1216 - Asphalt Paving. 6. Section 32 1313 - Site Concrete Work. 1.2 PROJECT REQUIREMENTS A. Import and Export of Earth Materials: 1. Fees: Pay as required by authorities having jurisdiction over the area. 2. Bonds: Post as required by authorities having jurisdiction over the area. 3. Haul Routes and Restrictions: Comply with requirements of authorities having jurisdiction over the area. 1.3 QUALITY ASSURANCE A. Comply with Standard Specifications for Public Works Construction, current edition, except as modified herein. 1176 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 16 - 2 Excavation Fill Paving 1.4 TESTING A. OWNER will retain a Geotechnical Engineer as an OWNER Consultant who will provide observations, tests, inspections and approvals identified in the Contract Documents as being responsibility of OWNER. B. Imported Soils: The Geotechnical Engineer will obtain initial product Sample for testing in accordance Article 3.05 of this Section. 1.5 PROJECT CONDITIONS A. Information on Drawings or in soils report does not constitute a guarantee of accuracy or uniformity of soil conditions over the Project site. PART 2 - PRODUCTS 2.01 A. BASE MATERIALS Concrete Slabs On Grade: Provide “Crushed Aggregate Base “as specified in the Standard Specifications for Public Works Construction, Section 200: “Rock Materials,” with ¾ inch maximum size aggregates. Provide 3-inch thick base, unless noted otherwise. B. Bituminous Surfacing: As indicated on Drawings and specified in Section 31 2326 - Base Course. 2.02 FILL AND BACKFILL MATERIALS A. Fill and backfill materials shall be previously excavated materials or imported fill material, free of clods and stones larger than 3-inch, foreign materials, vegetable growths, sod, expansive soils, rubbish and debris. Material shall conform to these specified requirements and related sections. B. Fill material exhibiting a wide variation in consistency and moisture content shall be blended or aerated to stabilize and upgrade the material. C. Imported Fill Material: 1. Provide suitable materials obtained from Project site excavations for earthwork and fill materials. If excavated materials are not of suitable quality or sufficient quantity, import additional materials as necessary. Notify the City if excavated materials are not suitable. 2. Imported fill shall be a granular material with sufficient binder to form a firm and stable unyielding subgrade and shall not have more than 60 percent of fines passing 200 mesh sieve. Material shall have a 1177 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 16 - 3 Excavation Fill Paving coefficient of expansion of not more than 2 percent from air dry to optimum moisture content and not more than 6 percent from air dry to saturation. Imported material shall be clean and free of rubbish, debris, and toxic or hazardous contaminants. Adobe or clay soils are not permitted. D. Brick rubble and broken concrete originating from the Project site shall be legally disposed of off the Project site. No such materials shall be imported from outside the Project site. PART 3 - EXECUTION 3.1 GENERAL A. Before initiating intrusive activities, contact Underground Service Alert of Southern California (USA or Dig Alert) to obtain a Dig Alert ticket for location information on buried public and USA member utilities and pipelines at least 48-hours prior to beginning work. A copy of the Dig Alert ticket shall be forwarded to the OWNER. For on-site utilities, retain a state-licensed third party underground utility locating service. B. Clear the Project site as indicated in Section 31 1000 - Site Clearing. 3.02 A. PROTECTION Protect and guard excavations against danger to life, limb, and property as required by, but not limited to, Cal-OSHA regulations. B. Protect adjacent existing improvements including landscaping against damage. 3.03 EXISTING UTILITY LINES A. Protect existing utility lines from damage or displacement. B. Remove conduits or pipes not in service, exposed during Work, unless a minimum cover of 2 feet is provided. Remove concrete, clay or other non- metallic pipe over 8 inches in diameter, unless otherwise indicated. C. Notify the City if encounter conduits, pipe, etc less than 2' depth for direction and related protection measures. 3.04 EXCAVATION A. Unclassified Excavations: Comply with the Standard Specifications for Public Works Construction, Section 300: "Earthwork,” except as modified herein. 3.05 FILL 1178 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 16 - 4 Excavation Fill Paving A. Unclassified Fill and Compaction: Comply with the Standard Specifications for Public Works Construction, Section 300: "Earthwork,” except as modified herein. B. Provide fill materials as specified in Part 2 - Products. If excavated materials from the Project site are not of required quality or sufficient quantity, import additional materials as necessary. Notify the City prior to import. C. Imported fill materials will be sampled by the Geotechnical Engineer for compliance with the requirements of Part 2 of this Section. D. The Geotechnical Engineer will submit samples to an owner approved independent approved testing laboratory for testing. E. Initial sampling will be performed by the Geotechnical Engineer before importing material to the Project site. Identify the location of the source site in addition to the address, name of the person and/or entity responsible for the source site. The Geotechnical Engineer will obtain both the initial and additional samples from the identified site and will submit samples to the approved independent testing laboratory for testing. F. If the total quantity of import is determined to be less than 1,000 yards, one sample shall be obtained and submitted for testing for each 100 cubic yards of imported material. G. The independent approved testing laboratory will perform the required tests and report results of tests noting if the tested material passed or failed such tests and will furnish copies to the Project Inspector, ARCHITECT, Owner’s Authorized Representative, CONTRACTOR, and others as required. Report shall state tests were conducted under the responsible charge of a licensed State of California professional engineer and the material was tested in accordance with applicable provisions of the Contract Documents, CBC, and the owner. Upon completion of the Work of this Section, the independent testing laboratory and Geotechnical Engineer shall submit a verified report to the owner as required by CBC. H. Bills of lading or equivalent documentation will be submitted to the Project Inspector on a daily basis. I. Upon completion of import operations, provide the owner’s authorized representative a certification statement attesting that imported material has been obtained from the identified source site. 1179 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 16 - 5 Excavation Fill Paving 3.06 INSTALLATION OF MATERIALS A. Fill or backfill materials shall be installed in horizontal layers of 6 inches, unless otherwise required. Each layer shall be evenly placed and moistened or aerated as necessary. Unless otherwise reviewed by the Geotechnical Engineer, each layer of fill material shall cover the length and width of the area to be filled before the next layer of material is installed. Top surface of each layer shall be installed to an approximate level with a crown or crossfall of at least 1 in 50, but no more than 1 in 20. Provide adequate drainage at all times during construction of the Work of this Section. 3.07 COMPACTING A. Each layer of fill material shall be compacted by tamping, sheepsfoot rollers, or pneumatic-tired rollers to provide specified relative compaction. At inaccessible locations, provide specified compaction by manually held, operated and directed compaction equipment. B. Unless otherwise indicated, compact each layer of earth fill to a relative compaction of at least 95 percent. C. When fill materials, or a combination of fill materials, are encountered or provided which develop densely packed surfaces as a result of installation or compacting operations, scarify each compacted layer before installing the next succeeding layer. 3.08 INSPECTION AND TESTING A. The Geotechnical Engineer will inspect and test excavations, sample material quality as required in Part 2, and observe installation and compaction of fill materials. B. The Geotechnical Engineer will sample imported fill materials from their designated source before delivery to the Project site. C. Installation of backfill will be observed by the Geotechnical Engineer. D. The Geotechnical Engineer will inspect and test excavation Work before the installation of fill and/or other materials. E. Compaction: Test compaction in accordance with ASTM D1557, Method C. F. If any tests or inspections fail, contractor responsible for performing the work necessary to meet the requirements of the specs and plans at no additional cost to the City. 3.9 PROTECTION A. Protect the Work of this Section until Substantial Completion. 3.10 CLEANING 1180 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 31 23 16 - 6 Excavation Fill Paving A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. END OF SECTION 1181 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA SECTION 31 23 26 BASE COURSE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Installation of base material. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 31 1000 - Site Clearing. 3. Section 31 2200 - Grading. 4. Section 31 2313 - Excavation and Fill. 5. Section 31 2316 - Excavation and Fill for Paving. 6. Section 32 1216 - Asphalt Paving. 7. Section 32 1313 - Site Concrete Work. 1.02 A. SUBMITTALS Crushed aggregate base (CAB) shall consist of native rock without naturally occurring asbestos or recycled materials. The CONTRACTOR shall submit written documentation, which identifies the source, volume, and proposed transport date of the material for review and approval by OWNER’S Office of Environmental Health and Safety (OEHS) prior to importing the material. A statement on company letterhead from the CAB source, stamped by either a California Professional Geologist or Engineer, which states that the subject materials are native rock, do not contain any recycled materials and that the source quarry does not mine ultramafic materials, a source of natural occurring asbestos shall be included in the submittal to OEHS. To be considered for a variance, the CONTRACTOR shall submit a documentation package for OEHS approval, which includes all of the aforementioned information at least 48 hours in advance of planned import. 1. Frequently used suppliers for projects include: a. Hansen Aggregates. 31 23 26 - 1 Base Course 1182 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA b. c. Vulcan Materials, Reliance Company. Vulcan Materials Durbin. C. Product Data: Submit material source, technical information and test data for base materials. Gradation and quality certifications shall be dated within 30 days of the submittal. D. Sample: Submit sample of proposed base course material. 1.3 QUALITY ASSURANCE A. Comply with the following as a minimum requirement: Standard Specifications for Public Works Construction, current edition. PART 2 - PRODUCTS 2.01 A. MATERIALS Crushed Aggregate Base (CAB) materials shall conform to the requirements of the Standard Specifications for Public Works Construction: Section 200 - Rock Materials. B. Crushed Miscellaneous Base (CMB) or materials generated on site shall not be used as a base course material. 2.02 MATERIAL APPROVAL A. Base material shall be inspected by the Project Inspector for gradation and material content prior to installation. The OWNER may choose to have additional tests performed by a geotechnical engineer, retained by the OWNER, before installation. PART 3 - EXECUTION 3.01 A. INSTALLATION Install base course material in layers not exceeding 4 inches in thickness, unless required otherwise. Grade and compact to indicated levels or grades, cut and fill, water and roll until the surface is hard and true to line, grade and required section. Provide a relative compaction of at least 95 percent, unless otherwise required. B. Grade base course to elevations indicated on Drawings, ready to receive surfacing, in accordance with Section 31 2200 - Grading. 3.02 PROTECTION A. Protect the Work of this section until Substantial Completion. 31 23 26 - 2 Base Course 1183 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA 3.3 CLEANUP A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. END OF SECTION 31 23 26 - 3 Base Course 1184 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA SECTION 32 12 36 ROLLED SLURRY SEAL, EXISTING PAVEMENT PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Asphalt emulsion slurry seal as indicated. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 32 0117 - Pavement Repair. 1.02 SUBMITTALS A. Shop Drawings: Submit plan indicating extent of areas to be sealed. B. Product Data: Submit mix design. 1.03 QUALITY ASSURANCE A. Comply with the following as a minimum requirement: Standard Specifications for Public Works Construction, current edition. PART 2 - PRODUCTS 2.01 MATERIALS A. Slurry Seal: Provide the following material grades in accordance with Section 203 - Bituminous Materials of the Standard Specification for Public Works Construction, current edition. 1. Emulsified asphalt shall be slow set type grade CSS-1h. 2. Grading of the combined aggregate and percentage of emulsified asphalt shall conform to Type I slurry requirements. 3. Installed slurry seal shall be sufficiently cured to permit vehicle traffic within one day after application. PART 3 - EXECUTION 3.01 REPAIRING AND ROLLED SLURRY SEAL EXISTING SURFACES A. Preparation of Surfaces: 32 12 36 - 1 Rolled Slurry Seal, Existing Pavement 32 01 17 - Pavement Repair 1185 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA 1. Before starting slurry seal operations, existing bituminous surfacing shall be cleaned of loose material, oil spots, vegetation, and other objectionable material. 2. Dampen surface to receive slurry seal with a light application of water to ensure coverage and proper bond. 3. Provide adequate protection over manholes, yard boxes, utility vaults and other improvements adjacent to the areas to receive slurry seal. Project Inspector shall inspect surfaces before the installation of slurry seal. B. Repair of Existing Surfacing: Cracks more than ½ inch wide, low areas, holes or depressions in existing surfacing shall be repaired as specified in Section 32 0117: Asphalt Pavement Repair, prior to the installation of slurry seal. C. Rolled Slurry Seal: Work shall be performed in accordance to Sub-section 302-4, Slurry, of the Standard Specifications for Public Works Construction, current edition. 1. Roll slurry surfacing with a 10-ton pneumatic roller with a tire pressure of 50 psi and equipped with a water spray system. Roll as soon as the surfacing is sufficiently cured and will not pick up on tires of roller. Surfaced areas shall receive a minimum of two coverage passes by roller. Provide a smooth surface free from ridges or surface variations. 2. Depressions occurring in cracks after initial slurry seal installation shall be filled with sand slurry before rolling and seal coat installation. 3.02 CLEAN UP A. Remove rubbish, debris and waste materials and legally dispose of off the Project site. 3.03 PROTECTION A. Protect the Work of this section until Substantial Completion. END OF SECTION 32 12 36 - 2 Rolled Slurry Seal, Existing Pavement 1186 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 01 90 - 1 Operation and Maintenance SECTION 32 01 90 OPERATION AND MAINTENANCE PART 1 - GENERAL 1.1 SUMMARY A. Work Specified in this Section: Furnish all labor, material, equipment, and services required to maintain the landscape in an attractive condition as specified herein for a period of 90 calendar days. B. Definition: The word Architect as used herein shall refer to the Landscape Architect or the Owner's authorized representative. 1.2 QUALITY ASSURANCE A. The Contractor's representatives and employees shall be experienced in landscape maintenance. 1.3 90 CALENDAR DAY MAINTENANCE PERIOD A. The Contractor shall continuously maintain all areas involved in this Contract during the progress of work. Maintenance period shall not start until all elements of construction, planting, and irrigation for the entire project are in accordance with Plans and specifications. 1. A prime requirement is that all lawn and groundcover areas shall have been planted and that all lawn areas shall show an even, healthy stand of grass seedlings or sod, either of which shall have been mowed twice. Maintenance period will not be shortened when these criteria is met but may be lengthened if not met. 2. The Contractor’s maintenance period will be extended if the provisions required within the Plans and specifications are not fulfilled. Project may not be segmented into maintenance phases. 3. The Contractor shall request a Pre-Maintenance inspection by the Owner and Architect at the completion of the installation process. 4. The Maintenance Period shall begin upon successful completion of the Pre- Maintenance walk-through punch list and acceptance of the landscape installation by the Owner. 5. If such criteria are met to the satisfaction of the Owner, a field notification will be issued to the Contractor to establish the effective beginning date of the maintenance period. B. The Maintenance Period continues for 90 calendar days until final acceptance of the work by the Owner. Improper maintenance or poor condition of planting at the 1187 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 01 90 - 2 Operation and Maintenance termination of the scheduled maintenance period shall cause postponement of the final completion date of the Contract. C. Any day when the Contractor fails to adequately maintain planting, replace unsuitable plants, or do weed control or other work, as determined necessary by the Owner, will not be credited as one of the maintenance periods working days. 1.4 GUARANTEE AND REPLACEMENT A. Guarantee: All plant material installed under the contract shall be guaranteed for a period of one year. Plants found to be dead or in poor condition due to faulty materials or workmanship, as determined solely by the Architect, shall be replaced by the Contractor at his expense. 1. Replacement: Materials found to be dead, missing, or in poor condition during the Maintenance period shall be replaced immediately. 2. The Architect shall be the sole judge as to the condition of material. 3. The Contractor shall replace material rejected during the Guarantee period within fifteen (15) days of written notification by the Owner. 1.6 OBSERVATION VISITS A. The Contractor shall request progress visits from the Architect at least 48 hours in advance of anticipated visits. Normal observation visits are as follows: 1. Immediately prior to the commencement of the work in this section. 2. Completion of first 90 days of maintenance. 3. Final acceptance. B. Fabricator Qualifications: Firm experienced in successfully producing metal fabrications similar to that shown on the drawings, with sufficient production capacity to produce required units without causing delay in the work. C. All materials used shall be free of lead and asbestos fibers. 1.7 OBSERVATION VISITS A. Prior to the date of the final observation visit, the Contractor shall acquire from the Architect-approved reproducible Plans and record (from the job record set) all changes made during construction, label these Plans "Record Drawings", and deliver to the Architect for review and approval. B. B. Prior to the date of final inspection, the Contractor shall deliver to the Architect a written "Landscape and Irrigation Guarantee" as required herein. 1188 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 01 90 - 3 Operation and Maintenance PART 2 - PRODUCTS 2.1 MATERIALS A. All materials used shall either conform to landscape specifications in other sections or shall otherwise be acceptable to the Owner. B. The Owner shall be given a monthly record of all herbicides, insecticides, and disease control chemicals used. Failure to provide such a record will continue maintenance period until compliance occurs. PART 3 - EXECUTION 3.1 MAINTENANCE A. Maintenance shall be performed according to the following standards: 1. All areas shall be weeded and cultivated at intervals of not more than ten (10) days. 2. Watering, mowing, rolling, edging, trimming, fertilization, spraying, and pest and rodent control, as may be required, shall be included in the maintenance period. 3. Street gutters shall be cleaned as part of the maintenance program. 4. The Contractor shall be responsible for maintaining adequate protection of the area. a. Damaged areas shall be repaired at the Contractor's expense. 5. Between the 15th day and the 20th day of the maintenance period, the Contractor shall reseed and re-sod all spots or areas within the lawn where normal turf growth is not evident. B. The Contractor shall be responsible for reporting to the Owner conditions beyond his control that prevent or have negative impact on the work required herein. 3.2 TREE AND SHRUB CARE A. Watering 1. Apply enough irrigation water so that moisture penetrates throughout root zone and only as frequently as necessary to maintain healthy growth. a. Do not maintain soils in a constantly wet condition. b. The contractor shall be responsible for familiarizing himself with the particular water requirements for the various plantings and shall be responsible for setting and maintaining the automatic controller to optimum minimum levels. 1189 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 01 90 - 4 Operation and Maintenance c. Damage to the plantings caused by over-watering or under-watering shall be the responsibility of the Contractor to replace at no cost to Owner. 2. Maintain a water basin around newly planted plants so that water can be applied to moisturize throughout the root zone. At the end of the maintenance period these basins shall be flattened out to match surrounding grades. 3. If hand-watering, use a fan spray nozzle to break the water force. B. Tree Pruning 1. Nursery grown trees will not normally require pruning for the first year. Prune trees only if directed by Architect or Owner, and only for these purposes: a. Selection and development of permanent scaffold branches that have a vertical spacing of from 18" to 48" and radial orientation so as not to cross each other. b. Elimination of diseased or damaged growth. c. Elimination of narrow V-shaped branch forks that lack strength. d. Reduction of toppling and wind damage by thinning out crowns. e. Maintenance of growth within space limitations. f. Maintenance of natural appearance. g. Balancing of crown-to-root ratio. 2. Under no circumstances will stripping of lower branches ("rising up") of young trees be permitted. a. Lower branches shall be retained in a “tipped-back" or pinched condition with as much foliage as possible to promote caliper trunk growth (tapered trunk). b. Lower branches can be cut flush with trunk only after the tree is able to stand erect without staking or other support. 3. Evergreen trees shall be thinned out and shaped when necessary to prevent wind and storm damage. The primary pruning of deciduous trees shall be done during the dormant season. Damaged trees or those that constitute health or safety hazards shall be pruned at any time of the year as required. C. Shrub Pruning 1. The objectives of shrub pruning are the same as for trees. Shrubs shall not be clipped into balled or boxed forms unless such is required by the design. 2. All pruning cuts shall be made to lateral branches or buds or flush with the trunk. "Stubbing" will not be permitted. 1190 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 01 90 - 5 Operation and Maintenance D. Staking and Guying: Stakes and guys shall remain in place until final acceptance and are to be continuously inspected and adjusted to prevent girdling of trunks or branches and to prevent rubbing that causes bark wounds and to allow trees to sway freely. Stakes and guys are to be removed when trees become sufficiently well rooted or after one year. When stakes or guys are removed, tree heads may be thinned to reduce wind load. E. Weed Control: Keep all areas, including basins and areas between plants, free of weeds. 1. Use recommended legally approved herbicides only when mechanical removal methods are not feasible. 2. Avoid frequent soil cultivation next to trees or shrubs that destroys shallow roots. 3. Use mulches to help prevent weed seed germination. F. Pest and Disease Control: Maintain control of insect and rodent infestations. The preferred method of control shall be biological control, or with non-toxic, biodegradable, organic materials. If stronger materials are needed, only materials that are recommended by a licensed Pest Control Advisor and are EPA approved and regulated shall be used. Only registered and licensed Pest Control Operators shall apply insecticide or chemical applications. Notify Owner a minimum of five (5) working days before chemical applications. G. Fertilization. 1. Fertilize all planting areas at 30-day intervals, with fertilizer and at rate as recommended by Soils Report. a. Avoid applying fertilizer to root balls and bases of main stems b. Spread fertilizer evenly around plants to drip line. c. Distribute fertilizer evenly over turf or groundcover areas to avoid patchy coloration. d. Replacement of Plants: Replace dead, dying, and missing plants with plants of a size, condition, and variety acceptable to Architect or Owner at Contractor's expense. 3.3 GROUND COVER CARE A. Weed Control: Control weeds preferably with mechanical methods, and with pre- emergent herbicides and selective systemic herbicides. Hoe weeds as little as possible since this may result in plant damage. Foot traffic in planted areas shall be minimized, and soil compaction shall be loosened immediately. B. Watering: Water enough so that moisture penetrates throughout root zone and only as frequently as necessary to maintain healthy growth. 1. Do not maintain soils in a constantly wet condition. 1191 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 01 90 - 6 Operation and Maintenance 2. The contractor shall familiarize himself with the particular water requirements for the planting and shall be responsible for setting and maintaining the automatic controller to optimum minimum levels. 3. Damage to the planting caused by over-watering or under-watering shall be the responsibility of the Contractor to replace. C. Trash: Remove trash weekly. Remove debris, clippings or branches produced by maintenance activities within 8 hours. D. Edging and Trimming: Edge ground cover to keep in bounds and trim top growth as necessary to achieve an overall even appearance. E. Replacement: Replace dead and missing plants at Contractor's expense. 3.4 IRRIGATION SYSTEM A. System Inspection: Contractor shall continuously check all systems for proper operation. Lateral lines shall be flushed out after removing the last sprinkler head or two at each of the lateral. All heads are to be continuously adjusted as necessary for proper coverage and to eliminate over-spray on buildings or paving. Contractors’ regular maintenance personnel shall test, observe, and adjust each sprinkler system no less than once per month. B. Controllers: Set and program automatic controllers for seasonal water requirements and minimum optimum water use. Give Owner's representative a key to controllers and instructions on how to turn off system in case of emergency. C. Repairs: Repair all damage to irrigation system at Contractor's expense. Repairs shall be made within one watering period. END OF SECTION 1192 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 32 12 36 - 1 Seal Bituminous Surfacing SECTION 32 12 36 SEAL BITUMINOUS SURFACING PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Surface sealer over bituminous surfacing. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 32 1216 - Asphalt Paving. 1.02 SUBMITTALS A. Product Data: Submit manufacturer's product information and application procedures for bituminous surfacing. 1.03 QUALITY ASSURANCE A. Comply with the Standard Specifications For Public Works Construction, current edition. B. Agitate bulk materials during transport. 1.04 MAINTENANCE A. Extra Materials: Provide 10 gallons in unopened containers. PART 2 - PRODUCTS 2.01 MATERIALS A. Provide one of the following surface seals: Product Name Manufacturer 1. Guard-Top CALMAT / Industrial Asphalt 2. Over Kote Diversified Asphalt Product 3. Park Top Western Colloid Products 4. Sure Seal Asphalt Coating Engineering 1193 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 32 12 36 - 2 Seal Bituminous Surfacing 5. Super Drive Top. SAF– T Seal. Inc. 6. Equal. PART 3 - EXECUTION 3.01 SURFACE PREPARATION A. Thoroughly wash surfaces with water to remove dirt, debris, excessive oil and grease, or other foreign matter. 3.02 APPLICATION A. Install seal coat in strict accordance with manufacturer's written directions and recommendations. B. Install two coats of surface seal to new bituminous surfacing. First coat shall be installed before flood testing. Clean surface and allow to dry before installing second coat. Second coat shall be installed after bituminous surfacing has passed flood test. C. Where new bituminous surfacing is installed adjacent to existing bituminous surfacing, overlap surface seal a minimum of 12 inches onto existing bituminous surfacing. D. Where existing bituminous surfacing is indicated to be patched and sealed, install two coats of surface seal after patching. Refer to Section 32 1216 - Asphalt Paving. 3.03 PROTECTION OF SURFACES A. Protect sealed and unsealed surfaces from damage and traffic during performance of the Work of this section and until surface seal has thoroughly set and cured. Do not permit traffic of any kind for at least 24 hours after completion of installation. B. Protect the Work of this section until Substantial Completion. 3.04 TESTING A. Owner reserves the right to obtain samples, perform tests to ensure compliance with the Specifications, and to review weight slips and invoices of materials delivered to the Project site. 3.05 CLEAN UP A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. END OF SECTION 1194 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 32 17 00 - 1 Parking Bumpers SECTION 32 17 00 PARKING BUMPERS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide precast concrete parking bumpers (wheel stops), with anchorage, for complete secure installation. 1.2 SUBMITTALS A. Product Data/Shop Drawings: Submit for parking bumpers dimensions, anchorage, and locations in accessible parking spaces. 1.3 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks. PART 2 - PRODUCTS 2.1 MATERIALS A. System Description: Provide precast concrete parking bumpers (wheel stops). B. Accessibility Regulatory Requirements: Provide for assuring access for persons with disabilities in accordance with state and federal regulations. 1. California Regulations: Comply with California Building Standards Code. 2. Federal Regulations: Comply with Americans with Disabilities Act (ADA) Standards. C. Regulatory Requirements, Volatile Organic Compound (VOC) Emissions: Comply with applicable air quality management district for VOC emissions for adhesives. D. Parking Bumpers: Stock manufactured parking bumpers of not less than 3000 psi concrete, without holes. E. Epoxy Adhesive: Nontoxic epoxy adhesive as recommended by adhesive manufacturer for use with parking bumpers and capable of withstanding loads from automobile wheels; steel anchor devices are not acceptable. 1195 MOORPARK CITY HALL TENANT IMPROVEMENT 03/15/2023 MOORPARK, CALIFORNIA 32 17 00 - 2 Parking Bumpers PART 3 - EXECUTION 3.1 INSTALLATION A. Set parking bumpers in minimum two spots of epoxy adhesive at locations indicated and as required by applicable codes and regulations. 1. Provide at front of each parking space unless otherwise indicated on Drawings. B. Set square and true with parking space lines. END OF SECTION 1196 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 32 17 20 - 1 Tactile Warning Surfaces SECTION 32 17 20 TACTILE WARNING SURFACES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Provide tactile warning surface to ensure tactile warning for persons with visual impairments as required by state and federal requirements. B. Related Sections: 1. Section 09 90 00: Painted traffic lines and symbols. 1.2 REFERENCES A. California Building Standards Code, Title 24, requirements for access for persons with disabilities. B. Americans with Disabilities Act (ADA) Standards. 1.3 SUBMITTALS A. Product Data: Submit manufacturer's product literature. B. Samples: Submit sample of tactile warning surface material. 1.4 QUALITY ASSURANCE A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for adhesives, sealants, and caulks. 1.5 PROJECT CONDITIONS A. Ensure substrates to receive tactile warning surfaces are smooth and flat with maximum variation of 1/8" in 10'-0". B. Ensure concrete is dry (maximum 7 percent moisture content) and exhibit negative alkalinity, carbonizing and dusting. 1.6 WARRANTY A. Extended Correction Period: Extend correction period to two years. 1. Repair or replace tactile warning units which break, delaminate or otherwise fail under normal usage. 1197 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 32 17 20 - 2 Tactile Warning Surfaces PART 2 - PRODUCTS 2.1 SYTEMS MANUFACTURERS A. ADA Solutions. B. Advantage Tactile Systems. C. Armor-Tile. D. SafetyStep TD. E. Substitutions: Refer to Section 01 25 00. 2.2 MATERIALS A. System Description: Provide tactile warning surfaces with accessories. B. Regulatory Requirements, Accessibility: Provide for assuring access for persons with disabilities in accordance with state and federal regulations. 1. California Regulations: Comply with California Building Standards Code. 2. Federal Regulations: Comply with Americans with Disabilities Act (ADA) Standards. C. Regulatory Requirements, Volatile Organic Compound (VOC) Emissions: Comply with applicable air quality management district for VOC emissions for adhesives. D. Regulatory Requirements, Slip-Resistance: Hard surface finishes to comply with requirements of authorities having jurisdiction for slip-resistant hard surfaces, including general code requirements and requirements for access for persons with disabilities. E. Tactile Warning Surface: Comply with applicable codes and regulations. Tactile warning surface shall differ from adjoining walking surfaces in resiliency or sound-on- cane contact. 1. Type: Contractor option to choose systems from manufacturers listed and to ensure preparation of installation of tactile warning surfaces result in top surface of system to be flush with adjacent surfaces unless otherwise indicated. a. Where otherwise indicated provide transition strips to comply with access requirements for ensuring smooth transition from adjacent surfaces to primary surface of tactile warning surfaces. 2. Color: Comply with applicable codes and regulations; where options are provided as selected by Architect from full range of code approved colors available. F. Primers and Adhesives: Waterproof epoxy or modified epoxy type as recommended by system manufacturer for specified material and extra heavy-duty application. 1198 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 32 17 20 - 3 Tactile Warning Surfaces PART 3 - EXECUTION 3.1 EXAMINATION A. Examine adjacent construction and ensure preparation for installation of tactile warning surfaces has been correctly coordinated. 3.2 PREPARATION A. Remove subsurface ridges, bumps and voids, and clean substrate. 3.3 INSTALLATION A. Spread cement evenly in quantity recommended by manufacturer to ensure adhesion over entire area of installation. 1. Spread only enough adhesive to permit installation of tactile surface material before initial set. B. Set in place with tight, even joints, and full adhesion in accordance with manufacturer recommendations and installation instructions. 1. Where radius installation is indicated, install with maximum 3/16" gap at leading edge of units using units designed for surface installation with tapered edges. C. Install units with tapered edges where edges of system are not recessed or not flush with adjacent surfaces. 3.4 CLEANING A. Remove excess adhesive from unit surfaces without causing damage to tactile surface or to adjacent surfaces. 1. Clean surfaces in accordance with manufacturer's recommendations. 3.5 PROTECTION A. Prohibit traffic for not less than 48 hours after installation unless otherwise noted in manufacturer's literature. END OF SECTION 1199 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 1 Landscape Irrigation SECTION 32 84 00 LANDSCAPE IRRIGATION PART 1 - GENERAL 1.1 DESCRIPTION A. Section includes automatic-control irrigation system as shown on the Drawings and as follows: 1. Trenching 2. Piping and Fitting 3. Valving 4. Assemblies 5. Automatic Controllers 6. Specialties 7. Wiring 8. Bubblers 9. Drip Irrigation 10. Cleanup 11. Connections to existing mains or municipal water systems. a. Related work: 1) Section 32 01 90: Operation and Maintenance of Planting 2) Section 32 93 00: Planting b. Definition: The word Architect as used herein shall refer to the Landscape Architect or the Owner's authorized representative. 1.2 QUALITY ASSURANCE AND REQUIREMENTS A. Permits and Fees: The Contractor shall obtain and pay for any normally required permits, fees and inspections as required. 1. Manufacturer's Directions: Manufacturer's directions and detailed Drawings shall be followed in cases where the manufacturers of articles used in this contract furnish directions covering points not shown in the Drawings and Specifications. 2. Ordinances and Regulations: Any local, municipal and state laws, and rules and regulations governing or relating to any portion of this work, are hereby incorporated into and made a part of these Specifications and their provisions shall be carried out by the 1200 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 2 Landscape Irrigation Contractor. Anything contained in these Specifications shall not be construed to conflict with any of the above rules and regulations or requirements of the same. However, when these Specifications and Drawings call for or describe materials, workmanship, or construction of a better quality, higher standard, or larger size than is required by the above rules and regulations, the provisions of these Specifications and Drawings shall take precedence. a. Comply with requirements of utility company supplying water. Include tapping of water mains and backflow prevention. b. Comply with standards of authorities having jurisdiction for potable-water-service piping, including materials, installation, testing, and disinfection. 1.3 SUBMITTALS A. Material List 1. Furnish the articles, equipment, materials, or processes specified by name in the Drawings and Specifications per requirements of Division 1 or the General Provisions. No substitutions will be allowed without prior written approval by the Architect. 2. Submit a complete materials list to the Architect prior to performing any work. Material list shall include the manufacturer, model number and description of all materials and equipment to be used according to example as follows: Item Description Manufacturer Model No. 1 Controller 2 Isolation Valve 3 Etc. 3. Irrigation submittals must be specific and complete. All items must be listed and should include solvent and primer, wire, wire connectors, valve boxes, etc. No copies of manufacturer's literature (catalog cuts) are required as submittal information. 4. Equipment or materials installed or furnished without prior approval of the Architect may be rejected and the Contractor required to remove such materials from the site at his own expense. 5. Approval of any item, alternate or substitute indicates only that the product or products apparently meet the requirements of the Drawings and Specifications based on the information or samples submitted. B. Record Drawings 1. Refer to Division 1 or General Provisions. 2. Record Set During the Work: At site, maintain not less than one complete set of Drawings as a Field Record Set. Record by showing depth and dimensioning horizontally from two permanent points of reference, building corners, sidewalk, or road intersections, etc., the location of the following items: a. Connection to existing water lines. b. Connection to existing electrical power. I I 1201 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 3 Landscape Irrigation c. Ball valves. d. Control valves. e. Quick coupling valves. f. Routing of mainline (pressurized line). g. Routing of control wiring. h. Items specified under Division 1 or as directed by the Architect. C. Final Record Drawings 1. Prior to substantial completion, the Architect will order for the Contractor, at the Contractor's expense, one complete set of reverse-reading, reproducible Mylar transparencies. 2. The Contractor shall transfer recorded changes in the work indicated on the field set to the reproducible set, neatly and clearly, technically correct, and drafted in ink by a skilled draftsman. 3. On or before the date of the final inspection, the Contractor shall deliver the corrected and completed reproducible plans to the Architect with a transmittal containing the date, project title and number, Contractor's name, address, and authorized signature. 4. Delivery of the reproducible plans will not relieve the Contractor of the responsibility of furnishing required information that may be omitted from the prints. D. Controller Charts 1. Record Drawings shall be approved by the Architect before controller charts are prepared. 2. Provide one controller chart for each controller supplied. The chart shall show the area controlled by the automatic controller and shall be the maximum size that the controller door will allow. 3. The chart shall be a reduced drawing of the actual as-built system. However, in the event the controller sequence is not legible when the drawing is reduced, it shall be enlarged to a size that will be readable when reduced. 4. The chart shall be a black and white bond print and a different color highlighter shall be used to indicate the area of coverage for each station. 5. When completed and approved, the chart shall be hermetically laminated between two pieces of plastic, each piece being minimum 10 mils thick. 6. These charts shall be completed and approved prior to final inspection of the irrigation system. E. Operation and Maintenance Manuals 1. Prepare and deliver to Owner within 10 days prior to completion, three hardcover ring binders with the following in each: 1202 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 4 Landscape Irrigation a. Index b. Guarantee statement. c. Address and phone number of Contractor d. Catalog and parts sheets on every material and equipment installed under this Contract with name, address and phone numbers of manufacturers and local representatives. e. 11” x 17” color copy of controller charts (not laminated). f. Complete operating and maintenance instructions on all major equipment and include maintenance schedules for all major equipment. 2. In addition to the above-mentioned maintenance manuals, provide the Owner's maintenance personnel with instructions for major equipment and show evidence in writing to the Architect at the conclusion of the project that this service has been rendered. F. Extra Equipment to be Furnished 1. Furnish extra materials described below (match products installed), packaged with protective covering for storage and identified with labels describing contents. a. Special Tools: Two sets of special tools required for removal, disassembling, and adjusting each type of sprinkler, drip emitter, and valve on the project. b. Controller Keys: Two keys for each automatic controller. 2. The above-described equipment shall be turned over to the Owner at the conclusion of the project. Before final inspection can occur, evidence that the Owner has received material must be shown to Architect. 1.4 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Handling of PVC Pipe and Fittings: The Contractor is cautioned to exercise care in handling, loading, unloading, and storing of PVC pipe and fittings. 1. All PVC pipes shall be transported in a vehicle which allows the length of pipe to lie flat so as not to subject it to undue bending or concentrated external load at any point. 2. Do not drop PVC pipe on hard surfaces. 3. Any section of pipe that has been dented or damaged is to be discarded and replaced at the contractor’s expense. 4. If damaged material is installed, it shall be replaced with new material. 1.5 WARRANTY A. The contractor shall fully warrant and agree to replace any poor, inadequate or defective materials and workmanship for one year from the date of acceptance of completed Irrigation System. The Architect shall be the sole judge of the acceptability of materials or workmanship. 1203 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 5 Landscape Irrigation B. Replacement: Materials found to be defective, missing or in poor condition during the warranty period shall be replaced immediately. The Architect shall be the sole judge as to the condition of material. Material to be replaced during the warranty period shall be replaced by the Contractor within 15 days of written notification by Owner. 1.6 PERFORMANCE REQUIREMENTS A. Handling Location of Bubblers and Specialties: Design location is approximate. Make minor adjustments necessary to avoid plantings and obstructions such as signs and light standards. Notify City prior to making adjustments. B. Explanation of Drawings 1. Drawings are diagrammatic and indicative of the work to be installed. All offsets, fittings, sleeves, etc., which may be required, may not be indicated. Carefully investigate the structural and finished conditions affecting all of the work and plan the work, accordingly, furnishing such fittings, etc., as may be required to meet such conditions. The work shall be installed in such a manner as to avoid conflicts between irrigation systems, planting, architectural features, drainage systems, or hardscape construction. 2. Do not install the irrigation system as shown on the Drawings when it is obvious in the field that obstructions, grade differences, or discrepancies in area dimensions exist that might not have been considered in the engineering. a. Any discrepancy in Drawings shall be brought to the attention of the Architect. Contractor assumes full responsibility for work installed without clarification. 3. The final location and exact positioning of automatic controllers, backflow prevention assemblies, gate valves, pressure regulators, or other equipment shall be approved by the Owner's authorized representative prior to installation. PART 2 - PRODUCTS 2.1 GENERAL A. Use only new materials of brands and types noted on the Drawings, as specified herein, or approved equivalents. 2.2 PIPE A. Non-pressure lines 3/4 inch in diameter and larger downstream of the remote control valve shall be SCH 40 solvent weld PVC conforming to ASTM D1785.Bar Stock: ASTM A276, Type 302 or 304. 2.3 POLY VINYL CHLORIDE (PVC) PIPES, TUBES & FITTINGS A. PVC pipe, tubes & fittings shall be of the schedule rating designated on the contract Drawings. B. PVC pipe shall continuously bear the following markings. 1. Nominal pipe size. 2. PVC Schedule or class. 3. Type of plastic material in standard code 1204 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 6 Landscape Irrigation 4. Pressure rating in psi 5. SDR for class rated pipe 6. ASTM designation 7. National Sanitation Foundation (NSF) approval. 8. Manufacturer's name or trademark 9. Date of extrusion. C. Schedule rated PVC Pipe shall be made from NSF approved Type 1, Grade I, PVC compound conforming to ASTM D-1785. D. PVC Fittings, Solvent and Primer. 1. For schedule rated pipe, fittings shall correspond to the same schedule rating. 2. For class rated pipe, fittings shall be Schedule 40. 3. PVC solvent-weld fittings shall be Type 1, Grade I, NSF approved, conforming to ASTM test procedure D-2466. 4. All fittings shall bear the manufacturer's name or trademark, material designation, size, applicable IPS schedule and NSF seal of approval. 5. Solvent cement and primer for PVC solvent-weld pipe and fittings shall be of the type prescribed by the pipe manufacturer. Installation methods shall be according to ASTM D- 2885.Extruded Bars and Shapes: ASTM B221, alloy 6061-T6 or 6063-T6 for bearing bars of gratings and shapes and 6061-T6 for grating cross bars. 2.4 BRASS PIPE AND FITTINGS A. Where indicated on the Drawings or required by Code, use red brass screwed pipe conforming to ASTM B43. B. B. Fittings shall be red brass. 2.5 VALVES A. Isolation Valves. 1. Shall be as called out on Drawings and details. 2. Brass and stainless steel, fully ported ball valves 3. 150 PSI at 73° B. Automatic Electric Control Valves. 1. Shall be as called out on Drawings and details. 2. Normally closed, diaphragm type with manual flow adjustment, and operated by 24-V ac solenoid. 1205 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 7 Landscape Irrigation 3. Automatic control valve shall have a brass or bronze body and bonnet. C. Master Control Valve. 1. Shall be as called out on Drawings and details. 2. Normally closed, diaphragm type with manual flow adjustment, and operated by 24-V ac solenoid. 3. Master control valve shall have a brass or bronze body and bonnet. D. Pressure Reducing Valve and Wye Strainer. 1. The pressure reducing valve shall be Wilkins Model #500HLR with wye strainer and bronze body. Size and pressure setting shall be as noted on irrigation Drawings. 2. Wye strainer used alone shall be Wilkins Model #YBXL with bronze body. Size shall be as noted on irrigation Drawings. E. Flow Sensor 1. Shall be as called out on Drawings and details. 2. Brass bodied, female threaded ends. F. Drip Flush Valve. 1. Shall be as called out on Drawings and details. 2. Sch. 40 PVC bodied, female slip ends. G. Check Valves. 1. Shall be as called out on Drawings and details. 2. Brass bodied, female threaded ends. 2.6 CONTROL WIRING A. Connections between the automatic controllers and the electric control valves shall be made with #14 THHN - UF 600-volt stranded copper wire manufactured for irrigation system use. Pilot wires shall be red. B. Common wires shall be white. C. Install in accordance with valve manufacturer's specifications and wire chart. In no case shall wire size be less than #14. D. Install control wires inside steel conduit, sweeps and junction boxes between the controller and the control valves. E. All control wire splices shall be made with waterproof wire connectors. Manufacturers: 3M DBY/R-6 or approved equal. F. All electrical work shall conform to local codes and ordinances. Above ground wires shall be conduit enclosed. 1206 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 8 Landscape Irrigation 2.7 AUTOMATIC CONTROLLERS A. Shall be of the size and type shown on the Drawings. B. Controller shall be weather based, with a satellite service providing daily evapotranspiration data to allow for the self-adjusting of the programming. C. Automatic controllers shall be as indicated on the drawings complete with hookup to electrical sources. D. All controllers shall be enclosed in a vandal-resistant, waterproof enclosure. E. Controller shall be connected to a rain sensor as shown on the Drawings. 2.8 VALVE BOXES A. Plastic Valve Boxes (to be used when valve is in planting areas). 1. For Drip System Flush valve, use. a. 10" diameter x 10" deep round box, Carson #910-4B or approved equivalent. b. Use min 10" diameter extensions to achieve proper depth below assembly. c. Lid shall be T-form, bolt-down type. d. Label: heat brand lid with the text “FV” in 1” tall block letters. 2. For Drip System Air Relief Valves, use. a. 8" diameter x 10" deep round box, Carson #809 or approved equivalent. b. Label: heat brand lid with the text “ARV” in 1” tall block letters. 3. Brand boxes with a commercially produced branding iron, as manufactured by BrandNew Industries, Inc. (800) 964-8251, or equal. 2.9 BUBBLER HEADS A. All sprinkler heads shall be of the same size, type and deliver the same rate of precipitation with the diameter (or radius) of throw, pressure, and discharge as shown on the plans and/or specified in these Specifications. B. Bubbler heads shall be installed on pop-up bodies. Anti-drain valves shall be installed as required for elimination of low head drainage. C. Riser nipples and swing joints for all sprinkler heads shall be the same size as the riser opening in the sprinkler body. 1. All sprinkler heads of the same type shall be of the same manufacturer. 2.10 DRIP IRRIGATION EQUIPMENT A. Drip emitters and inline drip tubing shall be of the size and type shown on the Drawings. 1207 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 9 Landscape Irrigation B. B. Single outlet emitters shall be a self-flushing and pressure compensating type. Emitter bodies shall be constructed of durable UV resistant plastic and have a self-piercing barb on the inlet side of the emitter. Regulating diaphragms shall be constructed of silicone rubber. C. C. Air / vacuum relief valve: Rainbird ARV050. D. D. Screen filters shall be manufactured by Hunter with pressure rating of at least 115 psi. Disc type filter element shall be minimum 150 mesh screen equivalent. Screen filters shall have glass reinforced nylon bodies and threaded male connections. PART 3 - EXECUTION 3.1 INSPECTION OF EXISTING SITE CONDITIONS A. Before any work begins, a conference shall be held with the Owner's authorized representative and the Contractor regarding general requirements for the project. B. It is the responsibility of the Contractor to familiarize himself with future locations of walls, paving, grade differences, etc. He shall coordinate his work with the General Contractor and other Sub-Contractors for the location and installation of pipe sleeves through walls, footings, under paving, etc., and so that there is no difficulty in the subsequent planting of trees or shrubs which are shown in the plans. C. Exercise extreme care in excavating and working near existing utilities. The contractor shall be responsible for damage to utilities that are caused by his operation or neglect. Check existing utilities Drawings for existing utility locations. Before excavating, call Underground Service Alert, (800) 422-4133 D. The contractor shall not willfully install the irrigation system as shown on the Drawings when it is obvious in the field those obstructions, grade differences, or differences in dimensions of areas exist that might not have been considered in the engineering. 1. Such obstructions or differences shall be brought to the attention of the Owner's authorized representative. 2. In the event this notification is not performed, the Contractor shall assume full responsibility for any revisions necessary. E. The contractor shall carefully check all grades to satisfy himself that he may safely proceed before starting work on the sprinkler irrigation system. 3.2 PREPARATION A. Physical Layout: Prior to installation, the Contractor shall stake out all pressure supply lines, routing, and location of sprinkler heads. All layouts shall be approved by Architect prior to installation. 3.3 WATER SUPPLY A. The Contractor shall verify static pressure on site prior to commencement of any work. B. The system design is based upon the minimum operating pressure and maximum flow demand shown on the Drawings. 1208 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 10 Landscape Irrigation 1. Contractor shall report any difference between the water pressure shown on the Drawings and the actual pressure at the point of connection to the Owner's authorized representative. C. All work required for proper point of connection and laying of irrigation supply line shall be in accordance with all applicable codes and ordinances. D. Connections shall be made at approximate locations as shown on Drawings. The contractor is responsible for minor changes caused by actual site conditions. 3.4 ELECTRICAL SUPPLY A. Electrical connections for automatic controller shall be made to electrical points of connection at approximate locations as shown on Drawings. The contractor is responsible for minor changes caused by actual site conditions. 3.5 INSTALLATION A. Trenching 1. Dig trenches straight and support pipe continuously on bottom of trench. Lay pipe to even grade. Trenching excavation shall follow layout indicated on Drawings and as noted. 2. Provide a minimum cover of 12" for all non-pressure lines. 3. Provide a minimum cover of 18” for all pressure lines. 4. Provide a minimum cover of 18” minimum for all non-pressure lines under paved areas. 5. Provide a minimum cover of 24” minimum for all pressure lines under paved areas. B. Backfilling - General 1. The trenches shall not be backfilled until all required tests are performed. Trenches shall be carefully backfilled with the excavated materials approved for backfilling, consisting of earth, loam, sandy clay, sand or other approved materials, free from large clods of earth or stones. Backfill shall be mechanically compacted in landscaped areas to a dry density equivalent to adjacent undisturbed soil in planting areas. Backfill will conform to adjacent grades without dips, sunken areas, humps, or other surface irregularities. 2. A fine granular material backfill will be initially placed on all lines. No foreign matter larger than 1/2" in size will be permitted in the initial backfill. 3. Flooding of trenches will be permitted only with approval of the Architect. 4. Under no circumstances shall truck wheels be used to compact soil. 5. Provide sand backfill a minimum of 6" over and under all piping routed under paving areas. 6. If settlement occurs and subsequent adjustments in pipe, valves, bubbler heads, planting, paving or other construction are necessary, the Contractor shall make all required adjustments without cost to the Owner. 1209 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 11 Landscape Irrigation C. Trenching and Backfill under Paving 1. Trenches located under areas where paving, asphaltic concrete or concrete will be installed shall be backfilled with sand (a layer three inches below the pipe and three inches above the pipe) and compacted to 90% compaction, using manual or mechanical tamping devices. Trenches for piping shall be compacted to equal the compaction of the existing adjacent undisturbed soil and shall be left in a firm unyielding condition. All trenches shall be left flush with the adjoining grade. The contractor shall set in place, cap, and pressure test all piping under paving prior to the paving work. 2. Generally, piping under existing walks is done by jacking, boring or hydraulic driving, but where any cutting or breaking of sidewalks and/or concrete is necessary, it shall be done and re-placed by the Contractor as part of the contract cost. Permission to cut or break sidewalks and/or concrete shall be obtained from the Architect. No hydraulic driving will be permitted under concrete paving. Where cutting and breaking has occurred, the entire concrete panel from joint-to-joint shall be replaced and not just a “patch”. 3. Provide a minimum cover of 24" between the top of the pipe and the bottom of the aggregate base for all pressure and non-pressure piping installed under asphaltic concrete paving. D. Assemblies 1. Routing of sprinkler irrigation lines as indicated on the Drawings is diagrammatic. Install lines and various assemblies to conform to the details shown on Drawings. 2. Perform all directional changes using 45-degree elbows. No 90-degree elbows will be permitted without approval of Architect. 3. Install all assemblies in accordance with respective details. In absence of detail Drawings or Specifications pertaining to specific items required to complete work, perform such work in accordance with best standard practice with prior approval of Architect. 4. PVC pipe and fittings shall be thoroughly cleaned of dirt, dust, and moisture before installation. Installation and solvent-welding methods shall be as recommended by the pipe and fitting manufacturer. 5. On PVC to metal connections, the Contractor shall work the metal connections first. Teflon tape or approved equivalent shall be used on all threaded PVC-to-PVC joints, and on all threaded PVC-to-metal joints. Light wrench pressure is all that is required. Where threaded PVC connections are required, use threaded PVC adapters into which the pipe may be welded. E. Line Clearance: All lines shall have a minimum clearance of six inches from each other and from lines of other trades. Parallel lines shall not be in-stalled directly over one another. F. Automatic Controller 1. Install as per manufacturer's instructions. Remote control valves shall be connected to the controller in numerical sequence shown on the Drawings. 2. The Architect shall approve the final location of automatic controllers. Unless otherwise noted on the plans, the 120-volt electrical power to the automatic controller location to be furnished by others. The final electrical hookup shall be the responsibility of the irrigation 1210 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 12 Landscape Irrigation Contractor. All electrical work shall conform to local codes, ordinances, and governing authorities having jurisdiction. 3. Install a line voltage surge device (intermatic ag2401c3/ or square d sdsa1175) for 120v in a junction box prior to controller. 4. Grounding for the irrigation controller is to be installed per the manufacturer's specifications and per the American Society of Irrigation Consultants guideline 100-2002 for earth grounding electronic equipment in irrigation systems found at www.asic.org/design_guides.aspx. For technical support regarding the irrigation controller or grounding please contact the manufacturer’s technical services. 5. A rain sensor shall be installed on the building eave adjacent to the controller. The sensor shall be mounted in a location in full sun and open to rainfall. The sensor shall be no more than 200' from wireless receiver. mount wireless receiver on or adjacent to the irrigation controller. G. Control Wiring 1. An expansion curl shall be provided within three feet of each wire connection. 2. A minimum of one additional blank remote control valve station wire shall be run from the controller to the furthest point of each separate leg of the mainline. Terminate wire in nearest valve box and tag "blank" in valve box and in controller. 3. Wiring shall occupy the same trench and shall be installed along the same route as the pressure supply lines wherever possible. 4. Where more than one wire is placed in a trench, the wiring shall be taped together at intervals of 12 feet. 5. All connections shall be of an approved type and shall occur in a valve box. Provide an 18-inch service loop at each connection. 6. An expansion loop of 12 inches shall be provided at each wire connection and/ or directional turn, and one of 24 inches shall be provided at each remote-control valve. 7. A continuous run of wire shall be used between the controller and each remote-control valve. Under no circumstances shall splices be used without prior approval. 8. Wire running from controller to control valves shall be AWG-UF 600V, No. 14 minimum, solid core, single conductor copper wire, and style Br. (direct burial type). 9. Spare control wires shall be run to valve box locations as shown on the plans. Provide an 18-inch expansion loop at valve box. H. Remote Control Valves: Install where shown on Drawings and details. I. Low Head Drainage: It is the intention of the design to indicate check valves and/or low head drain valves to prevent water from running out of sprinkler heads when systems are shut off. The Contractor shall include as part of the cost of his work installing any necessary check valves and/or low head drain valves which are necessary and may not be shown on the plans. J. Flushing of System 1211 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 13 Landscape Irrigation 1. After all the new sprinkler pipe lines and risers are in place and connected, and prior to installation of sprinkler heads, the control valves shall be opened and full head of water used to flush out the system. 2. Sprinkler heads shall be installed only after flushing of the system has been accomplished to the complete satisfaction of the Architect. K. Bubbler Heads 1. Install the bubbler heads as designated on the Drawings and details. Bubbler heads to be installed in this work shall be equivalent in all respects to those itemized. 2. Spacing of heads shall not exceed the maximum indicated on the Drawings. In no case shall the spacing exceed the maxi-mum recommended. L. Drip Irrigation installation 1. Install control valves and rigid PVC distribution lines prior to planting operations. 2. Drip tubing shall be installed in parallel rows not to exceed the spacing indicated on the Drawings and details. The perimeter row of tubing in all planters shall be installed a maximum of 4” from the edge of the planter, all interior rows shall be evenly spaced at a distance not exceeding 16” on center. Closer spacing of the tubing may be required in some or all planters due to planter size. 3. Flush and adjust systems, eliminate leaks, operate for a one-hour period, then re-check and re-adjust systems. 4. Complete planting and mulching operations. 3.6 TEMPORARY REPAIRS A. The Owner reserves the right to make temporary repairs as necessary to keep the sprinkler system equipment in operating condition. The exercise of this right by the builder/developer shall not relieve the Contractor of his responsibilities under the terms of the guarantee as herein specified. 3.7 FIELD QUALITY CONTROL A. Adjustment of the System 1. The Contractor shall flush and adjust all sprinkler heads for optimum performance and to prevent over-spray onto walks, roadways, and buildings. 2. If it is determined that adjustment in the irrigation equipment will provide proper and more adequate coverage, the Contractor shall make such adjustments prior to planting. Adjustments may also include changes in nozzle size and degrees of arc as required. 3. When the radius of any bubbler head requires downward adjustment to better suit actual conditions, the Contractor shall install pressure-compensating screens by the same manufacturer as the sprinkler nozzle, for flow and radius control. 4. The Contractor shall lower raised sprinkler heads within 10 days after notification by Owner. 1212 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 84 00 - 14 Landscape Irrigation 5. All bubbler heads shall be set perpendicular to finished grades unless otherwise designated on the plans. 3.8 CLEAN-UP A. Cleanup shall be made as each portion of work progresses. 1. Refuse and excess dirt shall be removed from the site. 2. All walks and paving shall be swept or washed down. 3. Any damage sustained on the work of others shall be repaired to original conditions acceptable to the Owner and Architect. B. Cleanup shall be performed at the end of each working day, and a maximum cleanup effort shall be made for each weekend by the Contractor in a manner satisfactory to the Owner. 3.9 FINAL OBSERVATION PRIOR TO ACCEPTANCE A. The Contractor shall operate each system in its entirety for the Architect at time of final observation. Any items deemed not acceptable shall be reworked at the contractor’s expense and must be to the complete satisfaction of the Architect. B. The Contractor shall show evidence to the Architect that the Owner has received all accessories, extra parts, charts, record Drawings, and equipment as required before final observation can occur. 3.10 OBSERVATION SCHEDULE A. The contractor shall be responsible for notifying the Architect in advance of the following observations according to the time indicated. 1. Pre-job Conference - Seven days. 2. Lateral line and bubbler installation - 48 hours. 3. Final observation - Seven days. B. When inspections have been conducted by someone other than the Architect, show evidence of when and by whom these inspections were made. C. No observation shall commence without adequate preparation or as-built Drawings. In the event the Contractor calls for an observation without as-built Drawings without completing previously noted corrections, or without preparing the system for observations, he shall be responsible for reimbursing the Architect at the hourly rate in effect at the time the observation portal-to-portal (plus transportation costs) for the inconvenience. No further inspections will be scheduled until this charge has been paid. END OF SECTION 1213 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 00 - 1 LANDSCAPE PLANTING SECTION 32 93 00 LANDSCAPE PLANTING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the supplying and installation of the following: 1. Trees. 2. Shrubs. B. Related Sections: 1. Section 01 56 39 - "Temporary Tree and Plant Protection" 2. Section 32 84 00 - “Landscape Irrigation” 1.2 DEFINITIONS A. Container-Grown Stock: Healthy, vigorous, well-rooted exterior plants grown in a container with well-established root system reaching sides of container and maintaining a firm ball when removed from container. Container shall be rigid enough to hold ball shape and protect root mass during shipping and be sized according to ANSI Z60.1 for kind, type, and size of exterior plant required. B. Finish Grade: Elevation of finished surface of planting soil. C. Planting Soil: Native topsoil, or surface soil modified to become topsoil; mixed with soil amendments. D. Sub-grade: Surface or elevation of subsoil remaining after completing excavation. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. B. Product Certificates: For each type of manufactured product, signed by product manufacturer, and complying with the following: 1. Manufacturer's certified analysis for standard products. 2. Analysis of other materials by a recognized laboratory made according to methods established by the Association of Official Analytical Chemists, where applicable. C. Qualification Data: For landscape Installer. D. Material Test Reports: For existing surface soil. 1214 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 00 - 2 LANDSCAPE PLANTING E. Planting Schedule: Indicating anticipated planting dates for exterior plants. 1.4 QUALITY ASSURANCE A. Installer Qualifications: A qualified landscape installer whose work has resulted in the successful establishment of exterior plants. The installer shall have a valid contractor C-27 license. 1. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when exterior planting is in progress. B. Soil-Testing Laboratory Qualifications: An independent laboratory, recognized by the State Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed. C. Topsoil Analysis: Furnish agronomic and MWELO soil analysis by a qualified soil-testing laboratory stating percentages of organic matter; gradation of sand, silt, and clay content; pH; and mineral and plant-nutrient content of topsoil. 1. Report suitability of topsoil for plant growth. The state recommended quantities of nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory topsoil. 2. Apply appropriate amendments based on soil test results with approval by the owner’s authorized representative. D. Provide quality, size, genus, species, and variety of exterior plants indicated, complying with applicable requirements in ANSI Z60.1, "American Standard for Nursery Stock." E. Tree and Shrub Measurements: Measure according to ANSI Z60.1 with branches and trunks or canes in their normal position. Do not prune to obtain required sizes. F. Observation: City authorized representatives may observe trees and shrubs at site before planting for compliance with requirements for genus, species, variety, size, and quality. The city authorized representative retains right to observe trees and shrubs further for size and condition of balls and root systems, insects, injuries, and latent defects and to reject unsatisfactory or defective material at any time during progress of work. Remove rejected trees or shrubs immediately from Project site. 1. Notify Owner’s authorized representative of planting materials seven days in advance of delivery to site. 1.5 DELIVERY, STORAGE, AND HANDLING A. Do not prune trees and shrubs before delivery, except as approved by the city authorized representative. Protect bark, branches, and root systems from sunscald, drying, sweating, whipping, and other handling and tying damage. Do not bend or bind-tie trees or shrubs in such a manner as to destroy their natural shape. Provide protective covering of exterior plants during delivery. Do not drop exterior plants during delivery. B. Handle planting stock by root ball, container, or box. 1215 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 00 - 3 LANDSCAPE PLANTING C. Deliver exterior plants after preparations for planting have been completed and install immediately. If planting is delayed more than six hours after delivery, set exterior plants trees in shade, protect from weather and mechanical damage, and keep roots moist. 1. Do not remove container-grown stock from containers before time of planting. 2. Water root systems of exterior plants stored on-site with a fine-mist spray. Water as often as necessary to maintain root systems in a moist condition. 1.6 COORDINATION A. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit. 1.7 WARRANTY A. Special Warranty: Warrant the following exterior plants, for the warranty period indicated, against defects including death and unsatisfactory growth, except for defects resulting from lack of adequate maintenance, neglect, or abuse by Owner, or incidents that are beyond Contractor's control. 1. Warranty Period for Trees and 5-gallon Shrubs: One year from date of Substantial Completion. 2. Remove dead exterior plants immediately. Replace immediately unless required to plant in the succeeding planting season. 3. Replace exterior plants that are more than 25 percent dead or in an unhealthy condition at end of warranty period. 4. A limit of one replacement for each exterior plant will be required, except for losses or replacements due to failure to comply with requirements. PART 2 - PRODUCTS 2.1 TREE AND SHRUB MATERIAL A. General: Furnish nursery-grown trees and shrubs complying with ANSI Z60.1, with healthy root systems developed by transplanting or root pruning. Provide well-shaped, fully branched, healthy, vigorous stock free of disease, insects, eggs, larvae, and defects such as knots, sunscald, injuries, abrasions, and disfigurement. B. Grade: Provide trees and shrubs of sizes and grades complying with ANSI Z60.1 for type of trees and shrubs required. Trees and shrubs of a larger size may be used if acceptable to City authorized representative, with a proportionate increase in size of roots or rootballs. C. If formal arrangements for consecutive order of trees or shrubs are shown, select stock for uniform height and spread. 1216 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 00 - 4 LANDSCAPE PLANTING 2.2 ORGANIC SOIL AMENDMENTS A. Wood Derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture, free of chips, stones, sticks, soil, or toxic materials. 2.3 FERTILIZER A. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition: 1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency. B. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water- insoluble nitrogen, phosphorus, and potassium in the following composition: 1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency. 2.4 MULCHES A. Organic Mulch: Free from deleterious materials and suitable as a top dressing of trees and shrubs, consisting of one of the following: 1. Type: Shredded Bark Mulch. Reference Section 32 93 00 Part 2.1. 2.5 STAKES AND GUYS A. Upright Stakes: Sound, new pressure-preservative-treated lodge pole, free of holes, cross grain, and other defects, 2-inch diameter by length indicated, pointed at one end. B. Rubber Tree Ties: Per Detail or approved equal. 2.6 PLANTING SOIL MIX A. Planting Soil Mix: Mix topsoil with the following soil amendments and fertilizers in the following quantities: 1. Ratio of Loose Wood Derivatives to Topsoil by Volume: 1:4. 2. Weight of Commercial Fertilizer per 1000 Sq. Ft.: 10 lbs. 1217 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 00 - 5 LANDSCAPE PLANTING PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas to receive exterior plants for compliance with requirements and conditions affecting installation and performance. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities, and lawns and existing exterior plants from damage caused by planting operations. B. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways. C. Lay out individual tree and shrub locations and areas for multiple exterior plantings. 3.3 PLANTING BED ESTABLISHMENT A. Loosen sub-grade of planting beds to a minimum depth of 4 inches. Remove stones larger than 2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property. 1. Spread amendments and fertilizer onto surface, and thoroughly incorporate into the top 6” depth of soil by roto-till, or equal. B. Finish Grading: Grade planting beds to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades. C. Restore planting beds if eroded or otherwise disturbed after finish grading and before planting. 3.4 TREE AND SHRUB EXCAVATION A. Pits and Trenches: Excavate circular pits with sides sloped inward. Trim base leaving center area raised slightly to support root ball and assist in drainage. Do not further disturb base. Scarify sides of plant pit smeared or smoothed during excavation. 1. Excavate approximately three times as wide as ball diameter for container-grown stock. B. Subsoil removed from excavations may be used as backfill. C. Obstructions: Notify City authorized representative if unexpected rock or obstructions detrimental to trees or shrubs are encountered in excavations. 1218 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 00 - 6 LANDSCAPE PLANTING D. Drainage: Notify City authorized representative if subsoil conditions evidence unexpected water seepage or retention in tree or shrub pits. 3.5 TREE PLANTING A. Set container-grown stock plumb and in center of pit or trench with top of root ball 1 inch above adjacent finish grades. 1. Carefully remove root ball from container without damaging root ball or plant. 2. Place planting soil mix around root ball in layers, tamping to settle mix and eliminate voids and air pockets. When pit is approximately one-half backfilled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed. Water again after placing and tamping the final layer of planting soil mix. B. Organic Mulching: Apply 3-inch average thickness of organic mulch extending 12 inches beyond edge of planting pit or trench. Do not place mulch within 3 inches of trunks or stems. 3.6 SHRUB PLANTING A. Shrub installation. 1. Positioning: After removing plant from container, scarify side of root ball to prevent formation of girdling roots and position plant in planting pit. 2. Backfilling: Use planting soil mixed to backfill plant pits. Set each plant plumb and brace rigidly in position until planting soil has been tamped solidly around the ball and roots. When plant pits have been backfilled approximately two-thirds (2/3) full, water thoroughly and saturate root ball before installing remainder of the backfill mix, eliminating all air pockets. Install remainder of mix to top of pit. 3. Where fertilizers are recommended, use a slow-release fertilizer. Place evenly distributed in plant pits when backfilled two-thirds (2/3) to finish grade according to the schedule. 4. Adjustment: Adjust plants to that after full settlement has occurred; the natural grade at the base of the plants is one (1) inch above the adjacent planting finish grade. B. Watering Basin: Form saucer with four (4) inches high berm centered around shrub pits twelve (12) inches wider than ball diameter. C. Watering: Water all plants immediately after planting. D. Labels: Remove all nursery-type plant labels from plants. 3.7 STAKING A. Upright Staking and Tying: Stake all single trunk trees. Use a minimum of 2 stakes of length required to penetrate at least 18 inches below bottom of backfilled excavation and to extend at least 72 inches above grade. Set vertical stakes and space to avoid penetrating root balls or root masses. Support trees with two rubber ties at contact points with tree trunk. Allow enough slack to avoid rigid restraint of tree. 1219 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 00 - 7 LANDSCAPE PLANTING 3.8 WEED ABATEMENT A. Weed Abatement Prior to Planting: 1. Water all areas thoroughly and uniformly. Continue watering at the frequency and duration necessary to germinate all residual week seeds, and as directed by the Agency’s Authorized Representative. 2. Unless otherwise directed, maintain watering for not less than three (3) weeks. 3. When perennial weeds appear, apply approved contact herbicide over affected areas. Apply in accord with manufacturer’s instructions. 4. When annual weeds appear, apply approved contact herbicide over affected areas. Apply in accord with manufacturer’s instructions. 5. Do not water affected areas for a period of four (4) days minimum, following application of contact herbicides. 6. Follow manufacturer’s instructions relating to time required for chemicals to effectively destroy week growth. 7. Resume watering and continue for a second period of three (3) weeks. a. A shorter watering period may be permitted by the Agency’s Authorized Representative, as determined by project conditions. 8. Discontinue watering for one (1) day prior to a second application of herbicide spraying. a. Reapply straight contact herbicide in accord with manufacturer’s instructions. b. Do not water treat areas for a period of four (4) days minimum following application of herbicide. c. Remove all desiccated weeds from the slopes to the finish grade. 3.9 PLANTER AREA MULCHING A. Mulch surfaces of planting areas. 1. Organic Mulch: Apply 3-inch thickness of organic mulch, and finish level with adjacent finish grades. Do not place mulch against plant stems or trunks. Do not bury any low- lying branches or plant material in mulch. 3.10 CLEANUP AND PROTECTION A. During exterior planting, keep adjacent pavings and construction clean and work area in an orderly condition. B. Protect exterior plants from damage due to landscape operations, operations by other contractors and trades, and others. Maintain protection during installation and maintenance periods. Treat, repair, or replace damaged exterior planting. 3.11 DISPOSAL A. Disposal: Remove surplus soil and waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of them off Owner's property. END OF SECTION 1220 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 01 - 1 Tree Pruning SECTION 32 93 01 TREE PRUNING PART 1 – GENERAL 1.1 GENERAL CONDITIONS A. The Conditions of the Contract and Division 1 apply to this section as fully as if repeated herein. 1.2 SUMMARY A. Work Included: All labor, materials, equipment, and services necessary to provide pruning of existing trees indicated to remain, or to be relocated and disposing of waste materials off the worksite. 1. Remove dead, diseased, and injured limbs. 2. Balance canopy with root system distribution. 3. Reduce density of tree canopy as directed. 4. Root pruning. B. Related Work: 1. Section 01 56 39 – Temporary Tree and Plant Protection 2. Section 31 11 00 – Site Clearing and Grubbing 3. Section 32 93 00 – Landscape Planting 1.3 SUBMITTALS A. Comply with provisions of Section 01340 - SUBMITTALS of DIVISION 1 - GENERAL REQUIREMENTS of these Specifications. B. Make all submittal 30 calendar days prior to start of Work of this Section. C. Submit in quintuplicate 5 complete lists of landscape materials and equipment, including manufacturer's name and address, specific trade names, catalog numbers, complete with illustrations and descriptive literature and clearly mark or underline proposed items. D. Disapprovals: Promptly resubmit for approval necessary data concerning a substitution for a disapproved item. E. Procurement List: Use the approved list of landscape materials and equipment for procurement without deviation unless otherwise authorized in writing by the Local City/County Jurisdiction. 1221 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 01 - 2 Tree Pruning F. Certification: In addition to other required certifications, furnish a certificate with each delivery of bulk material, stating its source, quantity, type of material furnished and that such item or material conforms to specification requirements. G. Bonds: Furnish a faithful performance bond in the amount specified in the Contract Documents to cover the guarantees per Section 4.01. 1.4 QUALITY ASSURANCE A. Workers: Use adequate numbers of skilled workers who are thoroughly trained and experienced in the necessary crafts and who are familiar with the specified requirements and the methods needed for proper performance of the Work of this Section. Contractors shall have a licensed arborist present on site during any root pruning. B. Codes and Regulations: All materials and workmanship in this Section shall comply with all applicable City, County, Federal and State Codes and Regulations. The contractor will obtain and pay for all required permits. Deliver all permits and certifications of inspection to the Local City/County Jurisdiction. 1.5 GENERAL REQUIREMENTS A. Approvals by the local city/county jurisdiction: 1. All approvals on required submittals hereinafter specified. 2. All re-submittals requested by the Local City/County Jurisdiction B. Inspection: Notify the local city/county jurisdiction at least 72 hours prior to time of the following required inspections: 1. At the time of all tree pruning. C. Existing Utilities and Plant Materials: Protect utilities and/or plant materials not designated for removal or modification in place against damage resulting from work of this Contract. Perform any removal and/or modifications only on approval or instructions from the Local City/County Jurisdiction or in accordance with applicable provisions noted or specified on the Contract Drawings or in other sections of these Specifications. D. Verifications of Dimensions and Quantities: Verify all scaled dimensions and quantities prior to start of work. Plant quantities noted on the Contract Drawings are for the convenience of the Contractor only and do not limit the Contractor to those specific quantities. Furnish the quantities as may be necessary to do the specific work. Promptly notify the architect of any discrepancies between the Contract Drawings and Specifications and/or actual job-site conditions which would affect the proper executions of the landscaping work. Do not work in areas where such discrepancies occur until further instructed by the architect. PART 2 - PRODUCTS 1222 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 01 - 3 Tree Pruning 2.1 PRUNING PAINT A. Waterproof, antiseptic, adhesive, elastic and free from kerosene, coal tar, creosote and other substances harmful to plants. Do not use shellac. 2.2 FUNGICIDE AND INSECTICIDE A. Selected by the Contractor, but approval by the Local City/County Jurisdiction via submittal before application. B. Inspect trees and surrounding areas for adverse conditions that may impede or adversely affect the Work, such as, but not limited to, overhead wires, wind conditions, and soundness and strength of tree. Notify the Local City/County Jurisdiction or its designee of any such adverse conditions. Do not proceed with pruning until the Local City/County Jurisdiction or its designee has been advised of the correction of such conditions. PART 3 - EXECUTION 3.1 PRUNING A. Cut limbs and branches, as necessary, to healthy wood, in accordance with the undercut, overcut, and flush-cut technique to reduce tree canopy density as directed. Do not remove limbs of diameter greater than two inches unless directed by the Local City/County Jurisdiction. Seal wounds larger than one inch in diameter with tree wound dressing. Trim bruises back to sound bark and tight cambium, and coat with tree wound dressing. Prune tree roots with cross- section larger than one inch and which will remain exposed during excavation operations. Cut exposed roots approximately three inches below elevation of finish grade. Coat wounds with root wound dressing and wrap with wet root wrap. B. Engage a qualified arborist to recommend procedures to compensate for loss of roots, such as pruning of branches and stimulation of root growth. Furnish maintenance during the Contract period, and as recommended by the arborist and accepted by the Local City/County Jurisdiction. Do not allow exposed roots to dry out before permanent backfill is placed; either cover roots with earth or pack with peat moss and wrap with burlap. Water, keep moist, and temporarily support and protect roots from damage until they have been permanently relocated and covered with backfill. 3.2 INSECTICIDE A. Apply fungicide and insecticide if trees exhibit symptoms of being attacked. Apply in accordance with the manufacturers' printed application instructions. 3.3 GUARANTEE A. General: Guarantee the life of all trees for a period of one year from the date of acceptance of the work. 1223 MOORPARK CITY HALL TENANT IMPROVEMENT 05/26/2023 MOORPARK, CALIFORNIA 32 93 01 - 4 Tree Pruning B. Deficiencies: Should any deficiencies develop within the specified guarantee period, correct such deficiencies to the full satisfaction of the Local City/County Jurisdiction without added expense to the city. 3.4 FINAL CLEAN-UP A. Required: Upon completion of all landscape work and before final acceptance, remove all tools, surplus materials, apparatus, debris, weeds and exterminate rodents from the jobsite. leave the jobsite in a neat, clean condition, acceptable to the City Inspector. Wash, clean and leave all paved areas without stains. B. Use, storage and disposal of containers and equipment shall comply with pertinent Federal, State, and local agency requirements. END OF SECTION 1224 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA SECTION 32 01 17 ASPHALT PAVEMENT REPAIR PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Bituminous Surfacing Repair: Areas removed for utility trenches, heaved by tree roots, cracked areas, protruding areas where pavement meets hard surfaces, depressed areas, holes and areas around new structures, and raveled bituminous pavement. 2. Areas heaved by tree roots, cracked areas, holes and trenches, and areas around new structures. B. Related Sections: 1. Division 01 - General Requirements. 2. Section 31 2200 - Grading. 3. Section 31 2313 - Excavation and Fill. 4. Section 31 2316 - Excavation and Fill for Paving. 5. Section 31 2326 - Base Course. 6. Section 32 0113 - Rolled Slurry Seal, Existing Pavement. 7. Section 32 1216 - Asphalt Paving. 8. Section 32 1313 - Site Concrete Work. 9. Section 32 1236 - Seal for Bituminous Surfacing. 1.02 SUBMITTALS A. Shop Drawings: Submit Shop Drawings indicating areas to be repaired. B. Product Data: Submit manufacturer’s technical data for materials and products. 1.03 QUALITY ASSURANCE A. Comply with Standard Specifications for Public Works Construction, current edition. PART 2 - PRODUCTS 2.01 MATERIALS A. Base course materials: Section 31 2326 - Base Course. B. Asphalt paving materials: Section 32 1216 - Asphalt Paving. C. Seal materials: Section 32 1236 - Seal for Bituminous Surfacing. D. Headers: Section 32 1216 - Asphalt Paving. 32 01 17 – 1 Asphalt Pavement Repair 1225 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA 1.03 QUALITY ASSURANCE B. Comply with Standard Specifications for Public Works Construction, current edition. PART 2 - PRODUCTS 2.01 MATERIALS E. Base course materials: Section 31 2326 - Base Course. F. Asphalt paving materials: Section 32 1216 - Asphalt Paving. G. Seal materials: Section 32 1236 - Seal for Bituminous Surfacing. H. Headers: Section 32 1216 - Asphalt Paving. 2.02 BITUMINOUS MATERIALS A. Provide materials and products of the class, grade or type indicated, conforming to relevant provisions of Section 203 - Bituminous Materials of the latest Standard Specifications for Public Works Construction. PART 3 - EXECUTION 3.01 PAVEMENT REMOVAL A. Remove bituminous and concrete pavement in accordance with applicable provisions of Section 300 - Earthwork of the Standard Specifications for Public Works Construction. B. Pavement Heaved By Roots: Remove pavement to limits of distortion and expose roots. Trim roots to provide at least 12-inch clearance to pavement. Coordinate with OWNER’s Tree Trimming Department for recommendations and approval prior to trimming roots. C. Remove protruding bituminous surfaces flush with the surrounding grade using a suitable tool or equipment so that adjacent finishes are not blackened. D. Remove raveled and depressed bituminous pavement to limits indicated or required. E. Saw cut existing improvements, trim holes and trenches in bituminous and concrete pavement to permit mechanical hand tampers to compact the fill. F. Remove broken concrete by saw cutting. If the required cut line is within 30 inches of a score or joint line or edge, cut and remove to the score, joint line, or edge. 3.02 EXCAVATING, BACKFILLING AND COMPACTING A. Conform to requirements in Section 31 2313 - Excavation and Fill; Section 31 2316 - Excavation and Fill for Paving, as required. 32 01 17 – 2 Asphalt Pavement Repair 1226 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA B. Where subgrade or base is deemed to be unstable or otherwise unsuitable, excavate such materials to firm earth, and replace with a required material. Install and compact fill materials in accordance with the requirements of Section 31 2316 Excavation and Fill for Paving. 3.03 HEADERS A. Install headers along edge of bituminous surfacing abutting turf, earth, or planting area, unless indicated otherwise. B. Install headers so the bottom surface has continuous bearing on solid grade. Where excavation for headers is undercut, thoroughly tamp soil under the header. Compact backfill on both sides of header to the density of the adjacent undisturbed grade. C. Fasten headers in place with redwood or Douglas fir stakes of length necessary to extend into solid earth a minimum of 12 inches. Stakes shall be of sound material, neatly pointed, driven vertically, and securely nailed to headers. Space stakes, not to exceed 4 feet on centers with top of stakes set one inch below top of header. Provide a minimum of two 12d galvanized common nails through each stake. D. Remove existing headers where new surfacing is installed adjacent to existing surfacing. E. Install temporary headers at transverse joints of paving where continuous paving operations are not maintained. F. Provide additional stakes and devices as required to fasten headers. 3.04 BASE COURSE A. Unless otherwise indicated, base course shall be crushed aggregate base, fine grade, 3 inches thick or equal to thickness of the existing base, whichever is greater. B. Fill grade and compact as specified in Section 31 2200 - Grading. 3.05 RESURFACING A. Utility Trenches: Remove loose dirt and backfill with cement-sand slurry allowing for surfacing one inch thicker than existing. Resurface flush with existing adjoining pavement installing the same type of materials and section provided in existing improvements. B. Other Areas: Other surface improvements damaged or removed shall be cut to a neat even line and excavated one inch below the bottom of the existing pavement. Resurface by following the original grades and installing the same type of materials provided in existing improvements. C. Where bituminous surfacing abuts concrete, masonry, walks or paving, tamp joint smooth, if necessary, as described above to obtain a uniformly even joint, true to line and grade. Tamp and smooth materials before asphalt cools. 3.06 REPAIRING AND RESEALING EXISTING SURFACES 32 01 17 – 3 Asphalt Pavement Repair 1227 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA A. Preparation of Surfaces: Prior to filling cracks, clean existing bituminous surfacing of loose and foreign materials and coat with a film of asphalt emulsion. B. Repair of Existing Surfacing: 1. Fill cracks 1/2 inch wide and less with RS-1 emulsion and washed plaster sand or other OEHS approved crack filler material. Cracks larger than ½ inch wide shall be filled with Type F/Sheet Mix Asphalt Concrete as specified. Cracks shall be filled to the level of adjacent surfacing. 2. Where low areas, holes, or depressions occur in existing surfacing, refer to Section 32 1216; Asphalt Paving, Article 3.02. Use Type E/School Mix and feather edge joint flush to the level of adjacent surfacing. C. Testing: Flood test entire area in presence of the Project Inspector. Inspect area after waiting one hour. Entire area tested shall be free of standing water or puddles in excess of 0.01 foot. Practical field measurement: 0.01 foot = two quarters stacked. D. Surface Seal: After surface has been repaired and tested, install seal coat over entire area indicated. Surface seal shall be as specified in Section 32 1236 - Seal for Bituminous Surfacing. 3.07 CLEANING A. Remove all stains on the Project site and adjacent properties caused by or attributed to the Work of this section. B. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. 3.08 PROTECTION A. Protect the Work of this section until Substantial Completion. END OF SECTION 32 01 17 – 4 Asphalt Pavement Repair 1228 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 32 12 16 - 1 Asphalt Paving SECTION 32 12 16 ASPHALT PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Paving for parking areas. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 31 2200 - Grading. 4. Section 31 2326 - Base Course. 5. Section 32 1236 - Seal for Bituminous Surfacing. 6. Section 32 1313 - Site Concrete Work. 1.2 SUBMITTALS A. Shop Drawings: Submit site plan indicating extent of paving and accessories. B. Product Data: Manufacturer’s technical data for materials and products. 1.3 QUALITY ASSURANCE A. Comply with the following as a minimum requirement: Standard Specifications for Public Works Construction. 1.4 PROJECT CONDITIONS A. Information on Drawings or in soils report does not constitute a guarantee of accuracy or uniformity of soil conditions over the Project site. B A copy of the soils report is available for examination in the office of the Architect during regular office hours of the Architect. PART 2 - PRODUCTS 2.1 BITUMINOUS MATERIALS 1229 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 32 12 16 - 2 Asphalt Paving A. Provide materials of the class, grade, or type indicated on the Drawings, conforming to relevant provisions of Section 203 - Bituminous Materials of the 2.02 Standard Specifications for Public Works Construction. HEADERS A. B. Concrete: Per specification Section 32 1313 - Site Concrete Work. Wood: 1. Redwood, Construction Heart Grade, size 2 by 6, unless otherwise indicated. 2. Stakes: 2 by 4 redwood or 2 by 3 Douglas fir, Construction Grade. 3. Nails: Common, galvanized, 12d minimum. PART 3 - EXECUTION 3.1 CONSTRUCTION OF ASPHALT CONCRETE PAVEMENT A. Thickness of Surfacing: Unless otherwise indicated on Drawings or specified, install bituminous surfacing to a compacted thickness of 2 inches. B. Provide surfacing material over base course as specified in Section 31 2326 - Base Course. C. Surfaces of walls, concrete, masonry, or existing bituminous surfacing indicated to be in direct contact with installed bituminous surfacing shall be cleaned, dried and uniformly coated with an asphaltic emulsion film. D. Thicken edges of bituminous surfacing that do not abut walls, concrete, or masonry, and edges joining existing bituminous surfaces. Remove headers at existing bituminous surfacing where new bituminous surfacing is to be installed. Thicken edges an additional 2 inches and taper to the indicated or specified thickness 6 inches back from such edges. E. Provide adequate protection for concrete, planting areas, and other finish Work adjacent to areas indicated to receive bituminous surfacing. F. Placing: 1. Do not install bituminous surfacing when atmospheric temperature is below 40 degrees F; or when fog or other unsuitable weather conditions are present. Temperature of mixture at time of installation shall not be lower than 260 degrees F in warm weather or higher than 320 degrees F in cold weather. 2. Where 2-inch or 3-inch thick surfacing is indicated or specified, install surfacing in one course. Where surfacing is indicated or specified 4 inches or more in thickness, except for thickened edges, install 1230 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 32 12 16 - 3 Asphalt Paving bituminous surfacing in courses of approximately equal thickness, each course not exceeding 2 ½ inches in thickness. G. Stakes or Screeds: Provide grade or screed stakes spaced not more than 15 feet apart in flow lines with grades of less than one percent. Continuous screeds may be provided instead of stakes. H. Spreading: Install bituminous surfacing in a manner to cause least possible handling of mixture. In open areas and wherever practicable, install by mechanical means with a self-propelled mechanical spreader. In confined or restricted areas, install mixture with hot shovels and rakes, and smooth with lutes. I. Joints: Provide vertical joints between successive runs. Install joints true to line, grade, and cross section. Lapped joints are not permitted. J. Rolling: 1. Finish roll with a self-propelled tandem roller weighing at least 8 tons. Break down roll with a self-propelled roller weighing between 1 ½ tons and 8 tons. 2. Roll in a manner that preserves flow lines and the established finished grades. Break down roll in areas adjacent to flow lines parallel to flow lines. Break down roll after bituminous surfacing is installed without shoving or cracking of mixture under roller. Continue finish rolling until surfacing is unyielding, true to grade, and meets requirements for specified smoothness. Areas inaccessible to finish roller may be finish rolled with breakdown roller or tamped with hot tamping irons and smoothed with hot smoothing irons or hand roller. 3. Where bituminous surfacing abuts concrete, masonry, walks or paving, tamp joint smooth, if necessary, as described above to obtain a uniformly even joint, true to line and grade. Tamp and smooth to properly compact. 4. Compacted bituminous surfacing shall be provided with a bulk specific gravity of at least 2.31 when tested in accordance with ASTM D1188. 3.2 TOLERANCE A. Smoothness: Surface of bituminous surfacing after rolling, shall be even, smooth and uniform in texture with no voids or rock pockets, free of roller marks or other irregularities, and not varying by more than 0.03 foot, except at local depressions or raised areas as indicated, when a 10-foot straightedge is placed on surface. B. Grade: Finished grade shall not vary more than 0.02 foot above or below required grade. Variations within prescribed tolerance shall be compensating so that average grade and cross-section are provided. 3.3 TESTING 1231 MOORPARK CITY HALL TENANT IMPROVEMENT MOORPARK, CALIFORNIA 02/03/2023 32 12 16 - 4 Asphalt Paving A. After first coat of surface seal has been installed and after a 24 hour period, the flood test shall be completed of the bituminous surfacing in presence of the Project Inspector. Repair areas of standing water or puddles and flood test locally; install surface seal and retest as necessary. 3.4 SURFACE SEALING A. After bituminous surfacing has passed flood test, clear and allow to dry and provide one more coat of surface seal as specified in Section 32 1236 - Seal for Bituminous Surfacing. B. Where indicated, provide multiple coats of surface seal to existing bituminous surfacing. C. Where new bituminous surfacing joins existing bituminous surfacing, overlap surface seal a minimum of 12 inches onto existing bituminous surfacing. 3.5 PROTECTION A. Protect the Work of this section until Substantial Completion. 3.6 CLEANUP A. Remove rubbish, debris and waste materials and legally dispose of off the Project site. END OF SECTION 1232 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA SECTION 32 12 36 SEAL BITUMINOUS SURFACING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Surface sealer over bituminous surfacing. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 32 1216 - Asphalt Paving. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product information and application procedures for bituminous surfacing. 1.03 A. QUALITY ASSURANCE Comply with the Standard Specifications For Public Works Construction, current edition. B. Agitate bulk materials during transport. 1.04 MAINTENANCE A. Extra Materials: Provide 10 gallons in unopened containers. PART 2 - PRODUCTS 2.1 MATERIALS A. Provide one of the following surface seals: Product Name Manufacturer 32 12 36 - 1 Seal Bituminous Surfacing 1. Guard-Top CALMAT / Industrial Asphalt 2. Over Kote Diversified Asphalt Product 3. Park Top Western Colloid Products 4. Sure Seal Asphalt Coating Engineering 1233 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA 5. Super Drive Top. SAF– T Seal. Inc. 6. Equal. PART 3 - EXECUTION END OF SECTION 32 12 36 - 2 Seal Bituminous Surfacing 3.01 A. SURFACE PREPARATION Thoroughly wash surfaces with water to remove dirt, debris, excessive oil and grease, or other foreign matter. 3.02 APPLICATION A. Install seal coat in strict accordance with manufacturer's written directions and recommendations. B. Install two coats of surface seal to new bituminous surfacing. First coat shall be installed before flood testing. Clean surface and allow to dry before installing second coat. Second coat shall be installed after bituminous surfacing has passed flood test. C. Where new bituminous surfacing is installed adjacent to existing bituminous surfacing, overlap surface seal a minimum of 12 inches onto existing bituminous surfacing. D. Where existing bituminous surfacing is indicated to be patched and sealed, install two coats of surface seal after patching. Refer to Section 32 1216 - Asphalt Paving. 3.03 PROTECTION OF SURFACES A. Protect sealed and unsealed surfaces from damage and traffic during performance of the Work of this section and until surface seal has thoroughly set and cured. Do not permit traffic of any kind for at least 24 hours after completion of installation. B. Protect the Work of this section until Substantial Completion. 3.04 TESTING A. Owner reserves the right to obtain samples, perform tests to ensure compliance with the Specifications, and to review weight slips and invoices of materials delivered to the Project site. 3.05 CLEAN UP A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. 1234 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA SECTION 32 13 13 SITE CONCRETE WORK PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland cement concrete pavement, cement walks, curbs, gutters, trash pick-up area, pipe bedding and encasements, thrust blocks, transition structures, flagpoles and light standard bases and footings. B. Related Requirements: 1. Division 01 - General Requirements. 2. Section 31 2200 - Grading. 3. Section 31 2313 - Excavation and Fill. 4. Section 31 2316 - Excavation and Fill for Pavement. 5. Section 31 2326 - Base Course. 6. Section 32 1216 - Asphalt Paving 1.2 SUBMITTALS A. Shop Drawings: Submit plans, elevations and details of concrete site Work. B. Product Data: Submit mix designs and manufacturer’s technical data for materials and products. Submit 3-inch by 3-inch concrete Sample of each specified color. 1.3 QUALITY ASSURANCE A. Comply with Standard Specifications For Public Works Construction. 32 13 13 - 1 Site Concrete Work 1235 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA PART 2 - PRODUCTS 2.01 MATERIALS A. Concrete, Mortar and Related Materials: Comply with applicable provisions of Standard Specifications for Public Works Construction, Section 201 - Concrete, Mortar and Related Materials: 1. Concrete: 28-day compressive strength 2,500 psi, unless specified otherwise. 2. Expansion Joint Filler: Preformed expansion joint filler, bituminous type, complying with ASTM D994. B. Form Materials: 1. Side forms: Douglas fir, Construction Grade or Better or metal forms. 2. Stakes: Douglas fir, Construction Grade or Better or metal stakes. PART 3 - EXECUTION 3.01 A. CONSTRUCTION OF FORMS FOR CAST-IN-PLACE STRUCTURES Concrete Pavement: Install Portland cement concrete pavement in compliance with the Standard Specifications for Public Works Construction, Section 302- Roadway Surfacing. B. Miscellaneous Exposed Concrete: Install concrete curbs, walks, gutters, cross gutters, access ramps, driveways, catch basins, yard boxes, vaults and similar structures, in compliance with the Standard Specifications for Public Works Construction, Section 303 - Concrete and Masonry Construction. 32 13 13 - 2 Site Concrete Work 1236 MOORPARK CITY HALL TENANT IMPROVEMENT 02/03/2023 MOORPARK, CALIFORNIA C. Exposed Concrete Bases: Install bases, such as for post, flagpole, light standards and similar bases, in compliance with the Standard Specifications for Public Works Construction, Section 303 - Concrete and Masonry Construction. D. Post, flagpole, light standard footings below grade, underground conduit bedding, encasements, thrust blocks and similar structures may be placed \directly in excavations conforming to the required sizes. E. Reinforcement installation and concrete placement, surface finishes, curing and removal of forms shall be performed in compliance with applicable provisions of Standard Specifications for Public Works Construction, Section 303 - Concrete and Masonry Construction. Provide heavy broom finish at slopes exceeding six percent and medium broom finish at slopes up to six percent. 3.2 CLEAN UP A. Remove rubbish, debris, and waste materials and legally dispose of off the Project site. 3.3 PROTECTION A. Protect the Work of this section until Substantial Completion. END OF SECTION 32 13 13 - 3 Site Concrete Work 1237 RESOLUTION NO. 2023-___ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR 2023/24 BUDGET TO ALLOCATE $6,880,750 FROM THE SPECIAL PROJECTS FUND (3004) FOR CITY HALL TENANT IMPROVEMENT PROJECT (C0070) WHEREAS, the City Council adopted the Operating and Capital Improvement Budget for Fiscal Year 2023/24 on June 21, 2023; and WHEREAS, a staff report has been presented to City Council requesting approval of an agreement with Monet Construction, Inc. for City Hall Tenant Improvement Project (C0070) in the total amount of $6,580,750 which includes a contingency of $598,250; and WHEREAS, the staff report also requests an additional $300,000 for Owner- Furnished-Owner-Installed work for the project; and WHEREAS, a budget amendment in the amount of $6,880,750 from the Special Projects Fund (3004) is needed to fund the work; and WHEREAS, Exhibit “A” hereof describes said budget amendment and its resultant impact to the budget line items. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. A budget amendment in the amount of $6,880,750 from the Special Projects Fund (1000), as more particularly described in Exhibit A, is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 2nd day of August, 2023. ________________________________ Chris R. Enegren, Mayor ATTEST: ___________________________________ Ky Spangler City Clerk Attachment: Exhibit A – Budget Amendment ATTACHMENT 2 1238 Resolution No. 2023-___ Page 2 FUND BALANCE ALLOCATION: Fund-Account Number Amount 3004-000-00000-33990 6,880,750.00$ Total 6,880,750.00$ EXPENDITURE APPROPRIATION: Account Number Current Budget Revision Amended Budget 3004-120-C0070-55400 -$ 6,880,750.00$ 6,880,750.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Total -$ 6,880,750.00$ 6,880,750.00$ Fund Title SPECIAL PROJECTS FUND EXHIBIT A BUDGET AMENDMENT FOR SPECIAL PROJECTS FUND CITY HALL TENANT IMPROVEMENT PROJECT (C0070) FY 2023/2024 1239