Loading...
HomeMy WebLinkAboutAGENDA REPORT 2023 1018 CCSA REG ITEM 10HCITY OF MOORPARK, CALIFORNIA City Council Meeting of October 18, 2023 ACTION APPROVED STAFF RECOMMENDATION. (ROLL CALL VOTE: UNANIMOUS) BY A. Hurtado. H. Consider Resolution Amending the Fiscal Year 2023/24 Budget for Fire Sprinkler Design Services Related to California Highway Patrol Tenant Improvements at Moorpark Police Services Center. Staff Recommendation: 1) Authorize City Manager to sign Funding Authorization with County of Ventura GSA for Fire Suppression Design Services in the amount of $6,201.53; and 2) Adopt Resolution No. 2023-4216, amending the Fiscal Year 2023/24 Budget for Design Services for Fire Sprinkler System Expansion for California Highway Patrol Tenant Improvement Project at Moorpark Police Services Center. (Staff: Jessica Sandifer, Deputy Parks and Recreation Director) (ROLL CALL VOTE REQUIRED) Item: 10.H. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Jessica Sandifer, Deputy Parks and Recreation Director DATE: 10/18/2023 Regular Meeting SUBJECT: Consider Resolution Amending the Fiscal Year 2023/24 Budget for Fire Sprinkler Design Services Related to California Highway Patrol Tenant Improvements at Moorpark Police Services Center BACKGROUND On June 15, 2005, the City entered into a 15-year lease with the California Department of General Services (DGS) that provided approximately 4,500 square feet of office space in the City’s Moorpark Police Services Center (MPSC) building for use by the California Highway Patrol (CHP). The lease was set to expire on October 31, 2020, but was extended in October 2020 to allow for additional negotiations on the long term lease renewal. The lease has been amended twice more and currently is set to expire October 31, 2023. As a part of the lease renewal, the CHP will be taking over a portion of the MPSC currently allocated to the Ventura County Sheriff’s Office (VCSO) section of the building. CHP, VCSO, and City staff met and conceptually agreed on changes to the building floor plans to accommodate both agencies’ needs. The City hired the Ventura County General Services Agency (GSA) staff to perform as construction managers for the CHP’s tenant improvement project. As part of the project, GSA hired an architectural firm to provide design and construction drawings for the tenant improvements, and solicited construction bids for the project. The City will be financing the tenant improvement project and recouping the cost through new, long-term lease agreement. DISCUSSION Part of the CHP’s tenant improvement project is to re-locate two interview rooms that are being taken over by the CHP as a part of the project to the reception area in the VCSO leased area. During the initial design of the project, it was assumed that the new interview room spaces could be constructed such that they would be able to use the existing fire sprinkler heads in the reception. However, after the design proceeded various issues Item: 10.H. 376 Honorable City Council 10/18/2023 Regular Meeting Page 2 with location of the skylight system has made it difficult to re-use the existing sprinkler heads. It has been determined that additional fire sprinkler heads will need to be designed to be installed in the new conference room locations. This will require additional design fees for the project. The cost for the design services for the fire sprinkler expansion is $6,201.53, which includes the 10% fee for GSA services. Funds have not been allocated in the Fiscal Year 2023/24 budget for these costs. A budget amendment is needed to facilitate the provision of these services. City Council approval and a budget amendment will be required once construction bids are received in order to fully fund the project. These costs will be included in the reimbursement from CHP. FISCAL IMPACT Staff is requesting a budget amendment in the amount of $6,202 from the Special Projects Fund (3004) to fund the fire sprinkler design services. The costs will be repaid by the CHP through the new lease agreement. ENVIRONMENTAL DETERMINATION This action is exempt from the California Environmental Quality Act (CEQA) as it does not constitute a project, as defined by Section 15378 of the State CEQA Guidelines. Therefore, no further environmental review is required. COUNCIL GOAL COMPLIANCE This action does not support a current strategic directive. STAFF RECOMMENDATION (ROLL CALL VOTE REQUIRED) 1. Authorize City Manager to sign Funding Authorization with County of Ventura GSA for Fire Suppression Design Services in the amount of $6,201.53; and 2. Adopt Resolution No. 2023-_______, amending the Fiscal Year 2023/24 Budget for Design Services for Fire Sprinkler System Expansion for California Highway Patrol Tenant Improvement Project at Moorpark Police Services Center. Attachment 1: Draft Resolution No. 2023-_____ Attachment 2: Funding Authorization – Fire Sprinkler Design 377 RESOLUTION NO. 2023-_______ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR 2023/24 BUDGET IN THE AMOUNT OF $6,202 FROM THE SPECIAL PROJECTS FUND (3004) FOR FIRE SPRINKLER DESIGN SERVICES FOR CALIFORNIA HIGHWAY PATROL TENANT IMPROVEMENT PROJECT AT MOORPARK POLICE SERVICES CENTER WHEREAS, the City Council adopted the Operating and Capital Improvement Budget for Fiscal Year 2023/24 on June 21, 2023; and WHEREAS, a staff report has been presented to City Council requesting a budget amendment for Fire Sprinkler Design Services for California Highway Patrol Tenant Improvement project at the Moorpark Police Services Center in the amount of $6,202 from the Special Projects Fund (3004); and WHEREAS, Exhibit “A” hereof describes said budget amendment and its resultant impact to the budget line items. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. A budget amendment in the amount of $6,202 from the Special Projects Fund (3004), as more particularly described in Exhibit “A”, is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 18th day of October, 2023. ________________________________ Chris R. Enegren, Mayor ATTEST: ___________________________________ Ky Spangler, City Clerk Attachment: Exhibit “A” – Budget Amendment ATTACHMENT 1 378 Resolution No. __-____ Page 2 EXHIBIT A BUDGET AMENDMENT FOR SPECIAL PROJECTS FUND CHP TENANT IMPROVEMENT PROJECT (C0073) FOR FIRE SPRINKLER DESIGN SERVICES FY 2023/2024 FUND BALANCE ALLOCATION: Fund Title & Account Number Estimated Current Available Balance Revision Estimated Amended Available Balance Special Projects Fund: 3004-000-00000-33990 $ 21,863,665 $ (6,202) $ 21,857,463 Total $ 21,857,463 EXPENDITURE APPROPRIATION: Account Number Current Budget Revision Amended Budget 3004-171-C0073-55300 $ 48,531 $ 6,202 $ 54,733 Total $ 48,531 $ 6,202 $ 54,733 379 $609.53 $6,201.53 ATTACHMENT 2 380