HomeMy WebLinkAboutAGENDA REPORT 1989 0419 CC REG ITEM 09AMOORPARK
o,-EM q. A.
ELOISE BROWN
Mayor
BERNARDO M. PEREZ
Mayor Pro Tern
CLINT HARPER, Ph. D.
Councilmember
PAUL LAWRASON
Councilmember
SCOTT MONTGOMERY
Councilmember
RICHARD T. HARE
City Treasurer
STEVEN KUENY
City Manager
CHERYL J. KANE
City Attorney
PATRICK RICHARDS, A.I.C.P.
Director of
Community Development
R. DENNIS DELZEIT
City Engineer
JOHN V. GILLESPIE
Chief of Police
MEMORANDUM
TO: The Honorable City Council
FROM: Patrick J. Richards, Director of Community Development
DATE: April 12, 1989 (CC meeting of 4/20/89)
SUBJECT: REVISIONS TO LAND USE APPLICATION FEES AND PLANNING RATES
Backq ound
On April 5, 1989, staff reported to Council on the need for an increase
in land use application fees. This report stated that amending the fee
schedule is needed for the City to recover costs for these services.
Staff recommended amendments to Resolution 84-130, pertaining to real
time cost accounting for planning staff time, and Resolution 83•-30
which pertains to developer, fees for land use applications. The report
points out that fees have not been adjusted for five years, and that
costs have increased dramatically during that time. Staff is returning
to Council for a public hearing in order to determine action on the
proposed revisions to the fee schedule and the hourly rate for planning
staff.
Discussion of Actual Cost Billina Rates
Staff has analyzed the relevant costs and the actual hours spent on
processing permits, and has determined a real time billing rate of
$75.00 per hour for staff time. This rate has been calculated by
analyzing each position involved in the process, and direct and
indirect costs. Three components apply to the hourly rate for planning
staff and have been calculated as follows, (refer to attachment °C° for
a detailed analysis of the three components):
1) Direct Costs
Direct costs have been calculated by assessing the four (4)
positions , (Director of Community Development, two
Senior Planners, and the A,.sociate Planner), which currently
accrue hours billable to the permit process. The cost;
for these positions have. been calculated by adding the
799 Moorpark Avenue Moorpark, California 93021 (805) 529-6864
rrrCA/ruDn&IT D.ID.n'ZT•nD•rm. .rlvl.no. rv'I
April 14, 1989
page 2
salaries and a factor of 35% of salaries for benefits.
2) Department Overhead.
Department overhead was based on four factors. First, the
personnel cost has been adjusted by subtracting salaries and
benefits for the four positions previously mentioned.
Secondly, maintenance and operations is calculated by
subtracting for professional services, (these services
include planning studies, and non -permit related planning
activities like the housing element and the downtown study).
Thirdly, capital outlay is calculated as a 4% factor of the
department total personnel and maintenance and operations
costs based upon 88/89 fiscal year figures. Lastly, fixed
overhead is based on rental value of the office space by
taking a percentage of the new City Hall utilized by the
planning staff, (50% of 5,000 square feet, multiplied by 50
cents per month for each square foot).
3) City Overhead
This cost is calculated in similar fashion to the City
Manager's 1984 report. Adjustments have been made to the
1989 figures as follows: a reduction in City Manager, City
Clerk, and Finance Department overhead; an increase in City
Attorney time; inclusion of Planning Commission and City
Council time; and an adjustment to the City Engineer
allocation. Staff followed the 1984 analysis as closely as
possible taking into account the significant differences
between the 1984/85 and the 1988/89 budgets.
Applicable Hours Calculation
Applicable hours are calculated for four planning staff positions which
are directly involved in the permit process. These hours are the
source of billable time that the permit fees are based on. Taking the
total hours available in a year, (2080), and subtracting for vacation,
holidays, sick leave and breaks, the calculation for billable hours is
determined to be 1,752 per employee. Multiplying this figure by four
employees, staff concludes that 7,008 hours per year are available for
billing to permit processing, advance planning and miscellaneous
activities, (see attachment "C").
Fee Schedule Revisions
The fee schedule is determined by the cost per, hour of staff time, and
the average amount of staff time necessary to process various permit
applications. Currently, the hours spent on applications frequently
exceed the 150% billing cap. This factor indicates that the current
fees need to be adjusted upward and staff recommends that the base fee
deposit be the current limit, (i.e. 150% of the current fee). It is
FCCCA/fLJDnKIT DID.nCT•nD.E7M-.rm. "ID--]
April 14, 1989
page 3
further recommended that the fee be further increased by the percentage
increase of the hourly rate as calculated in this report. The
percentage increase is 66%, ($45.00/hour to $75.00/hour). These
revisions have been illustrated in attachment "B".
In the April 5 staff report to Council, it was recommended that the
150% billing cap for services be removed from all permit fees.
Removing the cap not only allows the City to recover all costs for the
service, but it also encourages developers to work more expeditiously
through the permit process. At the April 5 meeting, the Building
Industry Association representative voiced his objection to the across
the board removal of a maximum processing fee for each entitlement. If
the Council wishes to have a cap, one alternative to staff's proposal
is to increase the cap to 100% of the proposed initial deposit amount
rather than removing it, and allow the Council to determine,(on a case
by case basis), if the cap should be adjusted to a higher amount based
upon the facts of each case. City staff is developing an accounting
system that will notify planners when the applicant is nearing the 70%
of the applicable limit. Open communication between planners and the
applicant can help both parties to work more efficiently on these
processes. As a reminder, the City Engineer is allowed to bill up to
25% of the fee deposit for their services.
The fee schedule should be adjusted on an annual basis. Currently
there is no quick way to determine these figures. The City of Thousand
Oaks has recently hired a consultant to analyze the City's fee
schedule. When the analysis is over, they will have a foundation from
which to refer to for the calculation of fees on an annual basis.
Staff is proposing that investing in this service will beneficial to
the City in recovering the costs of permit processing for many years.
This will provide staff with a base formula for calculating revised fee
schedules on an annual basis.
Summate
The analysis of the actual time billing rate results in an hourly rate
of $75.00 for staff time. This figure is based on an analysis of
direct and indirect costs incurred by the City in processing land use
applications. Additional items included in the recommendation are
related to information in the April 5 staff report pertaining to: zone
change processing fees; zoning maps; removing the 150% cap chargeable
to applicants for staff time spent on permits; and adjusting the 10%
contract service administrative fee to 15%. Staff has revised this
recommendation to include a fee increase that more appropriately
recovers the City's cost and recommends no billing cap but offers an
alternative of 100% of -initial deposit with council authority to
increase above this amount on a case by case basis. Lastly, staff
recommends consideration of a consultant that will provide a base
formula for annual revisions to the land use application fees. This
report represents Moorpark's first comprehensive revision to the permit
fee process. The comprehensive revisions to Resolution 83-30 and
April 14, 1989
page 4
Resolution 84-130 will allow the City to better recover costs
pertaining to land use application fees now and in subsequent years.
Recommendation
Adopt revisions to city resolutions pertaining to land use application
fees allowing the City to recover costs for processing related permits
as follows:
1. To adjust the real time cost accounting rate in Section 1 of
Resolution 84-130 from $45.00 to $75.00 per hour;
2. Adjust Section 2 of Resolution 84-130 for Contract Planning from
10% to 15%;
3. Adjust Land Use application processing fees in Resolution 83-30 by
increasing all fees to the 150% level of the current amount for
initial deposit and adding a 66% increase to reflect the increase
in hourly rates;
4. Add a fee for real time cost accounting for zone clearance
processing services as number 10.A of Resolution 83-30;
5. Add a fee for actual costs chargeable for zoning maps as No. 21 of
Resolution 83-30;
6. Direct staff to pursue proposals for a cost accounting study as
part of the 1989/90 work program;
7. Direct staff to return in July 1990, and annually henceforth with
revised fees and hourly rates;
8. Direct staff to modify the City Engineer contract to reflect the
increased rates as approved;
9. Other changes as determined by the City Council.
Attachments: A - Proposed Revisions to Resolution 83-30
B - Resolution 84-130
C - Staff Analysis
MOORPARK, CALIFORNIA
City Council Meeting
of 198 _
ACTION:
By
0
ATTACHMENT "A" Proposed Revisions to Resolution 83-30
CITY COUNCIL, CITY OF MOORPARK, STATE OF CALIFORNIA
RESOLUTION NO. 83-30
RESOLUTION ESTABLISHING SCHEDULE OF LAND
DEVELOPMENT PRELIMINARY PROCESSING FEE DEPOSITS EFFECTIVE
SEPTEMBER 7, 1983
IT IS HEREBY RESOLVED THAT LAND DEVELOPMENT PROCESSING CHARGES UNDER THE
AUTHORITY OF VENTURA COUNTY ORDINANCE CODE SECTIONS 8163-4.2 and 8220, AS ADOPTED
BY THE CITY OF MOORPARK. ON JULY 2, 1983, - FEES SHALL BE IN ACCORDANCE WITH TIE
FOLLOWING REAL TIME BILLING PROGRAM:*
CITY OF MOORPARK LAND DEVELOPMENT PROCESSING DEPOSIT SCHEDULE
PERMIT TYPE FEE DEPOSIT R�e—vised Fees
1. PLANNED DEVELOPMENT
a. Mobilehome Park $1,000.00 (base) + $5.00 per pad $ 2,500 + 12.50
b. Commercial $1,100.00 $ 2,750
C. Residential** $1,000.00 (base) + $5.00 per $ 2,500 + 12.50
dwelling unit
2. DEVELOPMENT PLAN $1,200.00 $ 3,000
3. CONDITIONAL USE AND OPEN SPACE USE PERMIT
-a. Residential and accessory
$ 800.00
$
2,000
uses thereto
$
2,750
b. Agricultural and accessory
$1,100.00
uses thereto
C. Commercial/Industrial/
$1,400.00
$
3,500
Institutional uses
d. Oil Drilling and Production
$1,900.00
$
4,750
Ttre—Real Time billing program will require the deposit of the applicad
fee(s) s in this resolution. Final cost of processing an cation
will be compute actual time expended (based e hourly rates
established to recover a s) but shal exceed the deposit fee by
more than fifty (50) percent, as otherwise indicated herein. If
final cost is less than t osit fee re " ed, the unused portion of the
deposit fee shal refunded to the applicant. cost is more than
the de ee received, the balance shall be payable by t icant, but
to exceed fifty (50) percent of the deposit fee.
If a Residential Planned Development application is filed concurrently with
a Tentative Tract Map, the deposit fee for the Residential Planned
Development permit shall be reduced by 50%_
e. Quarries and Clining
f. Waste Disposal/Treatment
4. ZONE CHANGE
5. TENTATIVE SUBDIVISION MAPS
a. Tentative Tract Clap
b. Tentative Parcel Clap,
Parcel Clap Waiver or
Conditional Certificate
of Compliance
C. Time extension of approved
tentative tract map
d. Time extension of approved
tentative parcel map
e. Parcel map reversion to
acreage
Current Fees
r�
Revised Fees
$3,000.00 deposit $ 7,500
$3,000.00 deposit $ 7,500
$1,250.00 $ 3,125
$1,800.00 (base) +
$35.00 per lot or unit
$1,400.00 (base) +
$50.00 per lot or unit
50% of current deposit fee
50% of current deposit fee
$ 300.00 (non-refundable)
$ 4,500 + 87.50
$ 3,500 + 125.00
$ 750
f. Lot line adjustments
$ 250.00 (non-refundable)
$
625
6.
VARIANCE
$ 850.00
$
2,125
7.
MAJOR MODIFICATION
80% of current deposit fee
8.
MINOR MODIFICATION
2O% of current deposit fee or
$
500
$200.00 whichever is greater
9.
ADMINISTRATIVE CLEARANCE
$ 200.00 (non-refundable)
$
500
10.
ZONE CLEARANCE
$ 20.00 + $2.00 per additional
$
50 + 5.00
lot/unit (non-refundable)
10.A.
Zone Clearance Processing
$ No Previous Fee
$
75/hr.*
Final cost of processing will be computed upon actual time expen a ase
upon the hourly rates established to cover all costs). If final cost is
less than the deposit fee received,
the unused portion of the deposit fee
shall be refunded to the applicant.
If final cost is more than the deposit
fee•received, the balance shall be payable by the applicant.
-^
On any Zone Change application filed
concurrently with a Tentative Tract Clap
and/or Residential Planned Development
permit, the deposit fee for the zone
change shall be reduced by 50%.
11. APPEALS
12. REVOCATION
13. VIOLATION PENALTY
14. ENVIROWIENTAL IMPACT REPORTS
a. Environmental Impact Report-
b. Environmental Impact Report
Addendum
C. Special Consultants
15. LAND CONSERVATION ACT CONTRACT -
AGRICULTURAL PRESERVES
a. Applications
b. Cancellation
C. Portion Non -Renewal
16. SIGN PERMIT
17. LANDSCAPE PLAN REVIEW
nlm TUCUVrTTMJ-_—.:
18. GENERAL PLAN APIENDMENTS�--*
19. PLANNED COMMUNITY^'
20. XEROX COPIES
8'" x 11" and 8''' x 14"
11" x 17"
Current Fees
25% of current deposit fee or
$300.00 whichever is greater
50% of current deposit fee
100% of current deposit fee,
not to exceed $S00.00 (non-
refundable)
Revised Fees
$ 750
$1,250
$2,000.00 deposit $5,000
$1,000.00 deposit $2,500
Total prepayment of consultant's
estimated cost, or acceptable bond.
$ 800.00
$ 800.00
$ 800.00
$ 20.00 (non-refundable)
$ 200.00 deposit
$1,000.00 (base) +
$5.00 _per acre
$1,000.00 (base) +
$10.00 per acre
$0.50 for 1st page + 0.25 per
each additional page
$1.00 for 1st page + 0.75 per
each additional page up to nine
pages + $0.50 per each additional
page thereafter
21. Zoning Maps New Item
In addition to permit deposit fee.
^^ Final cost of processing will be computed upon actual time expended (based
upon the hourly rates established to cover all costs). If final cost is
less than the deposit fee received, the unused portion of the deposit fee
shall be refunded to the applicant. If final cost is more than the deposit
fee received, the balance shall be payable by the applicant.
$2,000
$2,000
$2,000
$ 50
$ 500
$2,500 + 12.50
$2,500 + 25.00
$ Actual Cost
I
THE FOREGOING RESOLUTION was duly and regularly adopted by the City Council of
the City of Moorpark, California on ttie 7t11 day of September, 1983.
iIayor, i of rpark
Please Note: All references to specific Planning Fees in the Text of the Zoning
Ordinance was deleted by. amendment, pursuant to Ordinance 3034
adopted by the Board of Supervisors on June 24, 1975.
t
!� t 2 a F 'z ttizi 2: ; 2 ?tir: Ffi2FFFiFi ; , , , ; r'•2•F�2•<F+:�:•
F F •� • ,2�?F • s ass.r.rss.iisisa..,r, : ..... .,.,.,.. , s,ass,k.,s,s,.aa,lFaisi12it3�i2;.Yi�tsii.:ili.32rli.ra.>ir.r2riis•U23F3�3�
`ai2i2i2isFs3:,2♦3:3: ts:323:iti e r ,.,:F., r F>Fsi ,.,s,.,.,>..,.,.,....,s..s.�.u2sisa�sb2s,saa..asaasassaF. ,......,..... , ...,
/1
. 3
Attachment 6
I q
RESOLUTION NO. 84- i3
t� 1
A RESOLUTION OF THE CITY OF MOORPARK, CALIFORNIA,
FIXING REAL TIME COST ACCOUNTING FEES FOR
PLANNING STAFF.
WHEREAS, the City of Moorpark provides planning services;
and
WHEREAS, the cost of this service will be off -set by fees
which accompany land use entitlement requests; and
WHEREAS, City planning staff costs are charged against fees,
based on real time cost accounting;
NOW, THERFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK,
CALIFORNIA, DOES RESOLVE AS FOLLOWS:
SECTION 1. That the City Planning staff shall bill actual
time spent on land use applications at a real time cost accounting
rate of $45.00 per hour.
SECTION 2. Contract Planning staff shall be billed at
cost, plus ten per cent (10%).
i� SECTION 3. Pursuant to Government Code Section 54992(a), if
the fees in Section.No. 1 above create revenues in excess of actual
costs, those revenues shall be used to reduce the hourly rate in
subsequent years.
SECTION 4. That this resolution shall be effective and
operative as of July 1, 1984.
SECTION 5._ That Resolution No. 83-31, entitled:
A RESOLUTION OF THE CITY OF MOORPARK FIXING REAL
TIME COST ACCOUNTING.FEES REGARDING LAND USE
APPLICATIONS,
adopted September 7, 1983, be and the same is hereby repealed.
PASSED AND ADOPTED this 5th day of September, 1984.
.. V-e"-
Mayor the f Moorpark,
Califo nia
ATTEST:
STATE OF CALIFORNIA
COUNTY OF VENTURA SS.
CITY OF MOORPARK )
ICsG'
I, DORTS D _ BANKi1S , City Clerk of the City of
Moorpark, California, do hereby certify that the foregoing
Resolution No. R4_1 -10 was adopted by the City Council of the City of
Moorpark at a regular meeting thereof held on the 5th day of
September , 19 84 , and that the same was adopted by
the following vote, to wit:
AYES: Councilmenbers Harper, Straughan, Beaulieu,
Prieto and Mayor Yancy-Sutton;
NOES: None;
ABSENT: None.
WITNESS my hand and the official seal of said City this 5th
day of September 19 84
CITY CLERK
I/
ATTACHMENT C
STAFF ANALYSIS OF RELATED COMPONENTS THAT COMPRISE RECOMMENDED
REVISIONS TO RESOLUTION 84-130, PERTAINING TO THE ACTUAL COST OF STAFF
TIME FOR THE PROCESSING OF APPLICATIONS FOR LAND USE RELATED PERMITS
Calculation of Hours Directly Related to Permit Processing
Total Hours Available per Year 2080
Less
Vacation at 10
days/yr.
X
8 hrs. each
<80>
Less
Holidays at 11
days/yr.
X
8 hrs. each
<88>
Less
Sick Days at 6
days/yr.
X
8 hrs. each
<48>
Less
Breaks at 235*
days/yr.
X
one half hour each
<112>
Sub -total
1752
TOTAL (multiply by four employees)
7008 Hours
* 2080 hours less vacation, holidays, sick days then divide by 8 hours
per day equals 235 days.
Costs Applicable to Permit Processing
A) Direct Costs
Position
Salary
Benefits
Totals
Associate Planner
37,092
12,982
50,074
Senior Planner
40,896
14,314
55,210
Senior Planner
40,896
14,314
55,210
Director of C.D.
55,188
18,266 _
70,454
TOTAL DIRECT COSTS $230,948
B) Department Overhead
Item
City Cost
Deductions
Applied Amount
Personnel
384,924
280,013*
104,911
Maint. & Oper.
195,240
138,000
57,240
Capital Exp.
381,713
366,444
15,269
Fixed Overhead
30,000
15,000
15,000
TOTAL DEPARTMENT OVERHEAD
$192,420
* Personnel deductions calculated by subtracting the sum of: 90%
of the Code Enforcement position; 5% of the Administrative
Secretary position applicable to Code Enforcement activities; and
the direct costs calculated above.
t, ..aa ikikiliaa.rkiisiskiaa>a.iaaaiiiiaasaa,s.:b >, ..,.,...,.ssa.iaas...s.i.>ao.>...>asisasa.>.iaaashksa3aAi>iiii23aaaiia;k5�,raa i 25:ia2i0111aaaa831iN,...,.a,.,i >a. �a sa:i:itiaaisaaixiAt� �.ts.
/.2
C) General Overhead
Item
Actual
Costs
Deduction
Net
Costs
% Appl.
Total
Costs
C.Council
13,000
0
13,000
25
3,250
C.Mgr.
95,931
0
95,931
20
19,186
C.Clerk
92,214
8,000
84,214
15
12,632
C.Atty.
66,100
0
66,100
33
21,813
C.Treas.
900
0
900
15
135
Fin.Off.
82,019
0
82,019
15
12,303
Adm.Ser.
29,415
0
29,415
15
4,412
C.EnQ.
381.550
341.050
40,500
75
30,375_
TOTAL GENERAL OVERHEAD $104,106
COST SUMMARY
A) Direct Costs ........................230,952
B) Department Overhead .................192,420
C) General Overhead.. .104,106
GRAND TOTAL............................$527,478
Divide by Total Hours 7,008
TOTAL COST PER HOUR.....................$75.27
Rounded to the nearest dollar $75.00