Loading...
HomeMy WebLinkAboutAGENDA REPORT 2024 1002 CCSA REG ITEM 09ACITY OF MOORPARK, CALIFORNIA City Council Meeting of October 2, 2024 ACTION RECEIVED PRESENTATION. BY A. Hurtado. A. Consider Presentation by Fawne Yamashiro, Caltrans Project Manager Regarding the 2025 Pavement Rehabilitation Project for State Route 118 and State Route 23 (Los Angeles Avenue, between Montair Drive and Spring Road). Staff Recommendation: Receive presentation. (Staff: Brian Chong, Assistant to the City Manager) Item: 9.A. EA 07 -35170 Pavement Rehabilitation Project Route 118 and Route 23Between Montair Drive and Spring Road Mo n t a i r D r Sp r i n g R d Item: 9.A. 1 OVERVIEW 1.Project Location 2.Schedule 3.Project Scope 4.Cross Section 5.Traffic Handling 6.Contact Information 7.Questions and Answers 2 PROJECT LOCATION 3 SCHEDULE 1.Advertise – November 2024 2.Bid Opening – January 2025 3.Award – February 2025 4.Begin Construction – September 2025 5.Contract Acceptance – October 2027 4 PROJECT SCOPE 1.Cold plane and overlay the existing pavement with 0.20’ Asphalt Concrete Pavement and 0.20’ of Rubberized Hot Mix Asphalt – Gap Graded. 2.Re-pave approaching lanes at 6 intersections with Jointed Plain Concrete Pavement – Rapid Setting Concrete (JPCP-RSC). 3.Install/upgrade existing guardrails. 4.Upgrade 31 curb ramps to Americans With Disability Act Standards. 5.Install 46 Accessible Pedestrian Signals and touch-free pedestrian push buttons. 6.Install new signal poles at 6 intersections. 7.Install 2 Traffic Census count stations. 5 PROJECT SCOPE (CONT.) 8.Construct 705 feet of concrete sidewalk. Mo n t a i r D r 6 CROSS SECTION 7 TRAFFIC HANDLING 1.The construction work will be completed primarily during weekday nights. Shoulder closures may occur during the daytime for curb ramp construction. 2.There will be a minimum of one traffic lane open in each direction of travel, from Mira Sol Dr/Buttercreek Rd to Spring Rd. 3.There will be a minimum of at least one through traffic lane for use by both directions of travel from Montair Dr to Mira Sol Dr/Buttercreek Rd. 4.Nightime closures will be from 7PM - 7AM. 8 FUTURE CALTRANS PROJECTS IN CITY OF MOORPARK EA 36100 Pavement Rehabilitation Project Route 118 between Route 118/126 Separation to Montair Drive Construction – Spring 2027 to Spring 2028 EA 35010 Commercial Vehicle Enforcement Facility (Eastbound Direction) Route 118 between Grimes Canyon Road and Montair Drive Construction – Winter 2026 to Summer 2028 9 EA 36100 - PAVEMENT REHABILITATION 10 07-36100 - SCOPE IN AND NEAR MOORPARK 1.Cold plane and overlay the existing pavement with 0.20’ Asphalt Concrete Pavement and 0.20’ of Rubberized Hot Mix Asphalt. 2.Install/upgrade existing guardrails. 3.Upgrade existing roadside signs. 4.Install flexible channelizers within median of SR-118, east of Balcom Canyon Road. 5.Install new Traffic Safety Lighting at Bradley Road, La Cumbre Road, and Sand Canyon Road. 6.Install centerline rumble strip from Vineyard Avenue (east of Saticoy) to Buttercreek Road in Moorpark. 11 EA 35010 – WEIGH STATION 12 07-35010 - SCOPE IN AND NEAR MOORPARK 1.Construct a new Commercial Vehicle Enforcement Facility(CVEF) in the EB direction on SR-118. This will replace theexisting mini site located west of the City of Moorpark. 2.New off-ramp to CVEF and on-ramp onto EB SR-118. 3.Shoulder widening between Grimes Canyon Road andMontair Drive (EB only) 4.Concrete barrier between travel lane and facility. 5.Weigh -In-Motion (WIM) Facility. 6.Lighting in the inspection and out-of-service area. 7.Midwest Guardrail System (MGS) along edge ofshoulder. 13 CONTACT INFORMATION Public Information Officer Name: Marc Bischoff Email: marc.bischoff@dot.ca.gov Cell: (213) 317-0338 Project Manager Name: Fawne Yamashiro Email: fawne.yamashiro@dot.ca.gov Cell: (213) 266-6193 Design Manager Name: Munshi Mohsin Email: munshi.mohsin@dot.ca.gov Cell: (213) 392-1959 14 QUESTIONS & ANSWERS 15