Loading...
HomeMy WebLinkAboutAGENDA REPORT 2024 1002 CCSA REG ITEM 10GCITY OF MOORPARK, CALIFORNIA City Council Meeting of October 2, 2024 ACTION REJECTED STAFF RECOMMENDATION; RESOLUTION NOT ADOPTED. (ROLL CALL VOTE: UNANIMOUS) BY A. Hurtado. G. Consider Resolution Establishing a New Capital Improvement Program Project (C0078) "18 East High Street Sewer Project" and Amending the Fiscal Year 2024/25 Budget by Appropriating $162,602 for Design and Construction. Staff Recommendation: Adopt Resolution No. 2024-____ establishing a new Capital Improvement Program Project (C0078) "18 East High Street Sewer Project" and amending the Fiscal Year 2024/25 budget to appropriate $162,602 for design and construction. (Staff: PJ Gagajena, Assistant City Manager) (ROLL CALL VOTE REQUIRED) Item: 10.G. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: PJ Gagajena, Assistant City Manager DATE: 10/02/2024 Regular Meeting SUBJECT: Consider Resolution Establishing a New Capital Improvement Program Project (C0078) “18 East High Street Sewer Project” and Amending the Fiscal Year 2024/25 Budget by Appropriating $162,602 for Design and Construction BACKGROUND In December 2023, the City of Moorpark discovered a lateral sewer line was damaged at 18 East High Street, which is a City-owned property with a building and parking lot leased to the Moorpark Chamber of Commerce. The restrooms and water line inside the building were immediately shut down. The damage to the sewer line was caused during construction of the High Street Depot Project located east of the site. Apparently, the sewer lateral connection between 18 East High Street and the former Maria’s Restaurant located at 104 East High Street, where the High Street Depot Project is now being constructed, was not shown on utility maps and the line was inadvertently broken. The City worked with the Daly Group, Inc. (Daly Group), the developer of the High Street Depot Project, and the Ventura County Waterworks District over the course of the next several months to determine liability and plan for repairs. While it was initially determined the Daly Group was liable and had planned to make repairs after receiving approval from the County on the proposed sewer design in May 2024, the County abruptly withdrew their involvement in the project the following month and the Daly Group informed the City they would not fund the cost of repairs. In August 2024, the City decided to construct the lateral sewer line to move the project forward since the lack of water and use of restrooms at the Moorpark Chamber of Commerce have impacted its operations. Since the broken sewer line can no longer connect to lines at the High Street Depot Project, which is currently well advanced in construction, a new sewer lateral connection must be constructed from the parking lot at 18 East High Street to an existing sewer main line located on High Street just north of the property and in front of the High Street Arts Center. Item: 10.G. 63 Honorable City Council 10/02/2024 Regular Meeting Page 2 DISCUSSION Since construction of this sewer line is considered a new Capital Improvement Program (CIP) project, the City Council must approve it as CIP project number C0078 and authorize the budget for design and construction. The budget includes sewer line design, plan review, inspections, permitting fees, bid period support, construction management, construction activities and contingency costs. The sewer line design will be performed by m6 Consulting, Inc. (m6), which is an engineering services company that currently provides engineering and construction management services for the City of Moorpark. The inclusion of this sewer line project in their scope of services for the City will be processed through an Additional Services Authorization under authority of the City Manager. The total cost for design is $30,074, which consists of $27,340 in estimated costs plus a 10% contingency of $2,734; m6 charges on a time and materials basis and are only paid for actual time spent on the project. Once m6 completes the sewer design plans and obtains the necessary permits from Ventura County, the work will be bid out to construction companies through a Notice Inviting Bids. m6 will function as the City’s representative providing quality control review of the construction and bidding documents, ensuring that all value engineering items are included. They will also provide bidding assistance, including tracking and response of Request for Information (RFI) relevant to the design and City bidding requirements and review of bids for consistency and accuracy. The construction costs, including construction management services, are estimated to be $120,480 plus a 10% contingency of $12,048, which totals to $132,528. This includes prevailing wage costs. However, the exact construction costs will not be known until the project is bid out and cost estimates are received. Project design by m6 will take approximately four to six weeks and the Notice Inviting Bids process and actual construction may take between four to six months. However, the City will attempt to expedite this timeline as much as possible due to the urgent nature of this project. ENVIRONMENTAL DETERMINATION This action is exempt from the California Environmental Quality Act (CEQA) as it does not constitute a project, as defined by Section 15378 of the State CEQA Guidelines. Therefore, no environmental review is required. FISCAL IMPACT The estimated cost to design and construct this new sewer line is $147,820 and with a 10% contingency, the total not-to-exceed amount is $162,602. This includes $30,074 for the cost of design performed by m6 and the estimated construction cost of $132,528 with contingencies. The 18 East High Street Sewer Project CIP (C0078) requires a budget 64 Honorable City Council 10/02/2024 Regular Meeting Page 3 appropriation from the City’s Unallocated General Fund Balance and will be processed through a budget amendment for Fiscal Year 2024/25. COUNCIL GOAL COMPLIANCE This action does not support a current strategic directive. STAFF RECOMMENDATION (ROLL CALL VOTE REQUIRED) Adopt Resolution No. 2024-____ establishing a new Capital Improvement Program Project (C0078) “18 East High Street Sewer Project” and amending the Fiscal Year 2024/25 budget to appropriate $162,602 for design and construction. Attachment 1: Draft Resolution No. 2024-____ Attachment 2: m6 Consulting, Inc. Cost for Proposal 65 ATTACHMENT 1 RESOLUTION NO. 2024-____ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, ESTABLISHING A NEW CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECT (C0078) “18 EAST HIGH STREET SEWER PROJECT” AND AMENDING THE FISCAL YEAR 2024/25 BUDGET APPROPRIATING $162,602 FROM UNALLOCATED FUND BALANCE (1000) TO 18 EAST HIGH STREET SEWER PROJECT (C0078) FOR DESIGN AND CONSTRUCTION WHEREAS, on June 19, 2024, the City Council adopted the Operating and Capital Improvement budget for Fiscal Year (FY) 2024/25; and WHEREAS, on October 2, 2024, a staff report was presented to the City Council recommending establishment of a new Capital Improvement Program (CIP) Project (C0078) “18 East High Street Sewer Project” to track expenses associated with the design and construction of a sewer line at 18 East High Street; and WHEREAS, on October 2, 2024, a staff report was presented to the City Council requesting a budget amendment to appropriate $162,602 from Unallocated Fund Balance Fund (1000) to the 18 East High Street Sewer Project (C0078); and WHEREAS, Exhibit “A” attached hereto and made a part hereof, describes said budget amendment and the resulting impact to the line item. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. A budget amendment to appropriate $162,602 from Unallocated Fund Balance Fund (1000) to the 18 East High Street Sewer Project (C0078), as more particularly described in Exhibit “A”, attached hereto, is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 2nd day of October, 2024. ________________________________ Chris R. Enegren, Mayor ATTEST: ___________________________________ Ky Spangler, City Clerk Attachment: Exhibit A – Budget Amendment 66 Resolution No. 2024-____ Page 2 EXHIBIT A BUDGET AMENDMENT FOR 18 EAST HIGH STREET SEWER PROJECT (C0078) FY 2024/2025 FUND BALANCE ALLOCATION: Fund Title Unassigned Fund Bal Revision Amended Balance General Fund (1000) $ 524,948.19 $ (162,602.00) $ 362,346.19 $ - $ - Total $ 524,948.19 $ (162,602.00) $ 362,346.19 EXPENDITURE APPROPRIATION: Account Number Current Budget Revision Amended Budget 1000-171-C0078-55300 $ - $ 30,074.00 $ 30,074.00 1000-171-C0078-55500 $ - $ 132,528.00 $ 132,528.00 $ - $ - $ - $ - Total $ - $ 162,602.00 $ 162,602.00 67 m6 Consulting Inc. 893 Patriot Drive Unit E, Moorpark, California 93021 805.379.1015 | www.m6ConsultingInc.com September 19, 2024 Mr. PJ Gagajena Assistant City Manager City of Moorpark 799 Moorpark Avenue Moorpark, CA 93021 Subject: Cost Proposal for Design and Bid Period Services Chamber of Commerce Sewer Improvements Dear Mr. Gagajena, Thank you for the opportunity to provide this Proposal for Design and Bid Period Services to the City of Moorpark (City). m6 Consulting (m6) is a client – focused, service – driven, Moorpark based Small Business Enterprise (SBE) that specializes in civil engineering services for governmental, institutional, and higher education projects. The m6 team brings an integrated expertise to the City, with a blended background of capital project design, development review, program and project management, and construction period services. We are pleased to provide this proposal, which reflects the capabilities of our uniquely qualified firm to provide the requested scope of services to the City in connection with the design, utility coordination, agency permitting, bid period support related to the sewer improvements for the Chamber of Commerce. The project contemplates a new sewer lateral connection between Chamber of Commerce and the County Waterworks sewer main in High Street. Dalygroup initiated this project as part of the High Street Depot project improvements, and City has taken over management and design of the project. m6 design will be based on the initial plans provided by Dalygroup, with minor edits as requested by the City and necessary updates to accommodate County requirements. It is assumed that no survey work will be required, and that field verification and measurements will be sufficient for the project. Specifically, the anticipated services include: Scope of Services Task 101 – Field Verification and Site Visit: m6 will perform an initial site visit to evaluate site conditions and proposed scope. Based on the initial site visit, m6 will review the plans for any discrepancies in field conditions. m6 will perform additional site visits as needed during the design phase to accurately detail proposed plans. A budget of 6 hours is allocated to this task. Task 102 – Project Management, Meeting Attendance and Consultation m6 will provide project management associated with the proposed design and related permitting. m6 will provide for meeting attendance and consultation with the City as LETTER OF PROPOSAL ATTACHMENT 2 68 City of Moorpark Cost Proposal for Design and Bid Period Services Chamber of Commerce Sewer Improvements Page 2 necessary for the project. A budget of 36 hours has been allocated to this task. Task 103 – Plans, Specifications, and Estimates (PSE) m6 will prepare sewer plans to delineate the required work for the contract, bid and construction of the improvements for the Chamber of Commerce. These sewer plans will include the associated civil work required for the sewer lateral connection. Sewer plans will be completed at the 90% construction design level for City and permitting review and any comments will be incorporated in the 100% construction design level for the City. m6 will also prepare project specifications and engineering estimates at the 90% and 100% design level completion. A budget of 62 hours has been allocated to this task. Task 104 – County Waterworks Permitting m6 will coordinate with Ventura County Waterworks to obtain the necessary permits for the sewer lateral connection to the County’s sewer main in High Street. m6 will update the plans to reflect the County’s current standard border, standard drawings, and apply for a Sewer Will Serve Letter with the County. m6 will provide for meeting attendance, communication, and consultation with the County as needed for plan approval. A budget of 24 hours has been allocated to this task. Task 105 – Bid Period Support m6 will provide support for the City during bid period phase of the project. This task includes preparation of a staff report for City Council authorization to bid, preparation of a notice inviting bids, assembly of bid documents participation and management of a non-mandatory pre – bid meeting, management of bidding process including tracking, coordinating and reviewing RFI and preparing responses to contractor inquiries during the bid process. m6 will also review received bids to ensure completeness and accuracy and provide recommendations for selection of contractor. A budget of 32 hours is allocated to this task. Exclusions: 1. Payment of plan check and permit fees; 2. Construction period services; 3. Agency coordination and approvals not specifically addressed in this scope of work; 4. Survey; 5. Utility Relocations and Coordination beyond the specific Tasks/scope addressed; 6. Calculations, plans, studies, or investigations beyond the specific Tasks/scope addressed in the proposal. Efforts associated with the above Tasks are based on estimates of hours. Anticipated efforts related to this Scope of Work are summarized in the following Compensation (Exhibit “B”) section, with a staffing and hourly allocation breakdown in Exhibit “C”. A reimbursable budget has been set for this project, to address direct expenses related to reproduction, travel and related costs. Assumptions of efforts and related hourly 69 City of Moorpark Cost Proposal for Design and Bid Period Services Chamber of Commerce Sewer Improvements Page 3 distribution across staffing levels are approximate in the absence of a total project budget and may change based on final total project cost and schedule, and associated efforts. Please feel free to contact me at (805) 379 – 1015 with any questions you may have regarding our proposal and related scope of services. Sincerely, m6 Consulting, Inc. Robert Woodward, PE Principal 70 City of Moorpark Cost Proposal for Design and Bid Period Services Chamber of Commerce Sewer Improvements Page 4 EXHIBIT “B” COMPENSATION City of Moorpark Cost Proposal for Design and Bid Period Services Chamber of Commerce Sewer Improvements Compensation Schedule On an hourly basis, the Tasks outlined in Exhibit “A” above, and per the enclosed staff hours (Exhibit "C"). Staff will be billed based on their functional classification and corresponding hourly rate, as approved by the City in our On – Call Contract. TASK DESCRIPTION FEE Task 101 Field Verification and Site Visit $1,080.00 Task 102 Project Management, Meeting Attendance, and Consultation $ 6,480.00 Task 103 Plans, Specifications, and Estimates $8,970.00 Task 104 County Waterworks Permitting $4,230.00 Task 105 Bid Period Support $5,580.00 Reimbursable $1,000.00 Total Fee $27,340.00 71 Prepared By: Robert Woodward Position Principal Project Project Project Prof. Land PW Struct Total Total Eng Manager Eng.Designer Surv.Insp.Eng.Hours Fee Rate $225 $165 $150 $120 $200 $115 $150 ($) Task 101 Field Verification and Site Visit 2 2 2 6 $1,080 Task 102 Project Management, Meeting Attendance, and Consultation 12 12 12 36 $6,480 Task 103 Plans, Specifications, and Estimates 4 8 25 25 0 0 0 62 $8,970 Task 104 County Waterworks Permitting 6 12 6 24 $4,230 Task 105 Bid Period Support 8 12 12 32 $5,580 Sub Total Hours 32 46 57 25 0 0 0 160 Total $7,200 $7,590 $8,550 $3,000 $0 $0 $0 $26,340 $1,000 $27,340.00Total EXHIBIT "C" m6 CONSULTING PROPOSED HOURS AND STAFF ALLOCATION Date: September 19, 2024 Project: Design and Bid Support Services: Chamber of Commerce Sewer Improvements m6 Reimbursable 72