HomeMy WebLinkAboutAGENDA REPORT 2025 0305 CC REG ITEM 10HCITY OF MOORPARK, CALIFORNIA
City Council Meeting
of March 5, 2025
ACTION APPROVED STAFF
RECOMMENDATION.
BY A. Hurtado.
H. Receive the City of Moorpark 2024 General Plan Annual Progress Report Including
the Housing Element Progress Report. Staff Recommendation: Receive and file
the report. (Staff: Doug Spondello, Community Development Director)
Item: 10.H.
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable City Council
FROM: Doug Spondello, Community Development Director
DATE: 03/05/2025 Regular Meeting
SUBJECT: Receive the City of Moorpark 2024 General Plan Annual Progress
Report Including the Housing Element Progress Report
BACKGROUND
The General Plan serves as the principal policy document for guiding community growth
and the provision of public services. The General Plan is defined by specific community
priorities and values that are identified during the public outreach process. The General
Plan will typically encompass a 20 or 30-year planning period and is organized into
elements (chapters), such as Land Use, Circulation, Housing, Conservation, etc. Each
element details the existing context and future planning strategy for that topic.
On May 3, 2023, the City Council adopted General Plan 2050. The 2021-2029 Housing
Element was previously adopted on February 15, 2023. A summary of each element of
the City’s General Plan and the year that it was last adopted or revised is provided
below.
General Plan Element Year of Adoption or Last Revision
Land Use 2023
Circulation 2023
Housing 2023
Economic Development 2023
Open Space, Parks, and Recreation (OSPR) 2023
Conservation 2023
Safety 2023
Noise 2023
Government Code Section 65400 requires the planning agency of each local
government to prepare an Annual Progress Report (APR) documenting the status of the
General Plan and its implementation over the previous calendar year. APRs also inform
the City Council and public of the progress in meeting the City’s goals, including the
City’s share of regional housing. The APR must be provided to the City Council, the
Item: 10.H.
510
Honorable City Council
03/05/2025 Regular Meeting
Page 2
Governor's Office of Planning and Research (OPR), and the California Department of
Housing and Community Development (HCD). HCD also requires the City to complete
a standard form spreadsheet known as the Housing Element Annual Progress Report
that summarizes housing permitting and development activities over the previous year.
Selected portions of that report with information regarding the units produced, projects,
and housing program status are included as Attachment 1.
STATUS OF THE GENERAL PLAN AND IMPLEMENTATION PROGRESS
The 2021-2029 Housing Element
The Existing Housing Element
For the 2024 reporting year, the 2021-2029 Housing Element provides an analysis of
the existing and projected housing needs and a statement of goals, policies, objectives,
financial resources and scheduled programs for the preservation, improvement and
development of housing. State law requires that the Housing Element of the General
Plan be updated every eight years.
A major component of the Housing Element is the allocation of housing units through a
process known as the Regional Housing Needs Assessment (RHNA). RHNA
allocations are provided in eight-year cycles by HCD and in coordination with the
Southern California Association of Governments (SCAG). With each update to the
Housing Element, the City is required to identify sites suitable for housing development
and to provide zoning that is sufficient in order to fully meet the City’s RHNA obligation.
The City’s existing Housing Element fully addresses the needs of the existing RHNA
allocation.
The City of Moorpark’s RHNA requirement for the 2021-2029 Housing Element cycle is
1,289 units with specific levels of affordability. In 2024, building permits were issued for
296 units. A detailed report of housing permitting activity during 2024 is included as
Attachment 1. As of December 31, 2024, permit issuance for RHNA units is as follows:
EXISTING REGIONAL HOUSING NEEDS ASSESSMENT AND BUILDING PERMITS
ISSUED 2021-2029
Housing
Income Type*
RHNA
Allocation
for 2021-2029
New Units
Permitted in
2024
Total Units to
Date (all
years)
RHNA Remaining
Housing Need by
2029
Very Low 377 61 71 367
Low 233 141 157 217
Moderate 245 22 29 238
Above
Moderate
434 72 72 434
Total: 1,289 Units
Required
296 Units
Permitted
329 Units 960 Units Remaining
*Pursuant to State Law, each income type refers to a defined percentage of the area median income in Ventura
County (AMI): very-low income (31-50% AMI), low income (51-80% AMI), moderate income (81-120% AMI), and
above moderate income (>120% AMI)
511
Honorable City Council
03/05/2025 Regular Meeting
Page 3
The City has met its RHNA obligation by designating land in the General Plan that is
sufficient to accommodate the development of the housing units. While 296 building
permits were issued in 2024, there are approximately 2,100 residential units that have
approved planning entitlements but have not yet obtained a building permit. Staff
expects that the number of building permits issued by the City will increase dramatically
in the coming years as entitled projects such as the Hitch Ranch, North Ranch, Pacific
Communities, and the remaining units in Beltramo Ranch move forward.
Adopted and Proposed Amendments to the Housing Element
On February 15, 2023, the City Council adopted the 2021-2029 Housing Element. No
subsequent amendments were proposed in 2024.
Other Elements
The adoption of General Plan 2050 included new Land Use, Circulation, Economic
Development, Open Space, Parks, and Recreation (OSPR), Conservation, Safety and
Noise Elements. No subsequent amendments to these Elements were adopted or
proposed in 2024.
ENVIRONMENTAL DETERMINATION
This report is exempt from environmental review pursuant to Section 15061(b)(3) of the
California Environmental Quality Act.
FISCAL IMPACT
There is no fiscal impact associated with receipt of this report.
COUNCIL GOAL COMPLIANCE
The City’s annual report is required by HCD and OPR. It does not support a current
strategic directive.
STAFF RECOMMENDATION
Receive and file the report.
Attachment: 2024 HCD Housing Element Annual Progress Report
512
Jurisdiction Moorpark
Reporting Year 2024 (Jan. 1 - Dec. 31)
Total Award Amount Total award amount is auto-populated based on amounts entered in rows 15-26.
Task $ Amount Awarded $ Cumulative Reimbursement
Requested
Other
Funding Notes
Summary of entitlements, building permits, and certificates of occupancy (auto-populated from Table A2)
Current Year
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 3
Deed Restricted 0
Non-Deed Restricted 8
5
16
Current Year
Deed Restricted 60
Non-Deed Restricted 1
Deed Restricted 138
Non-Deed Restricted 3
Deed Restricted 12
Non-Deed Restricted 10
72
296
Current Year
Deed Restricted 0
Non-Deed Restricted 3
Deed Restricted 0
Non-Deed Restricted 2
Deed Restricted 0
Non-Deed Restricted 3
0
8
Moderate
Above Moderate
Total Units
Completed Entitlement Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
Total Units
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low
Total Units
Certificate of Occupancy Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
ANNUAL ELEMENT PROGRESS REPORT
Local Early Action Planning (LEAP) Reporting
(CCR Title 25 §6202)
Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02
or 50515.03, as applicable.
-$
Task Status
ATTACHMENT
513
Jurisdiction Moorpark ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field
Reporting Year 2024 (Jan. 1 - Dec. 31)Housing Element Implementation
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Application
Status Project Type Notes
2 3 4 6 7 8 9 11 12 13
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
(see
instructions)
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low-Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income
Deed
Restricted
Moderate-
Income
Non Deed
Restricted
Above
Moderate-
Income
Total PROPOSED
Units by Project
Total
APPROVED
Units by project
Total
DISAPPROVED
Units by Project
Please select state
streamlining
provision/s the
application was
submitted pursuant
to.
Did the housing
development
application seek
incentives or
concessions
pursuant to
Government Code
section 65915?
Were incentives
or concessions
requested
pursuant to
Government
Code section
65915 approved?
Please indicate
the status of the
application.
Is the project
considered a
ministerial
project or
discretionary
project?
Notes+
Summary Row: Start Data Entry Below 0 0 0 0 0 1 0 1 1 0
512-0-141-075
436 1/2 Bard Attached ADU
22-0984 /
BLR2022-0532 ADU R 10/13/2022
1 1 1 NONE No N/A Approved Ministerial
505-0-120-135
3940 Dalaway Drive SFD
BLR2023-1076 /
AP2020-04 SFD R 6/17/2020
1 1 1 NONE No N/A Approved Discretionary
512-0-280-095 14168 1/2 Maya Circle Detached ADU BLR2022-0463 ADU O 10/3/2022
1 1 1 NONE No N/A Approved Ministerial
511-0-133-105 230 1/2 Whitney Detached ADU BLR2022-0435 ADU R 9/30/2022
1 1 1 NONE No N/A Approved Ministerial
512-0-126-095
344 1/2 Sherman
Garage Conversion
Attached BLR2023-1371 ADU R 4/20/2023
1 1 1 NONE No N/A Approved Ministerial
511-0-103-130
301 1/2 Cornett Avenue
Garage Conversion
Detached BLR2023-1905 ADU O 10/10/2023
1 1 1 NONE No N/A Approved Ministerial
514-0-012-065
14734 1/2 Hartford Street
Garage Conversion
Attached BLR2023-1938 ADU R 10/13/2023
1 1 1 NONE No N/A Approved Ministerial
513-0-200-265 7358 1/2 Hightop Street
Garage/Casita
Conversion ADU BLR2024-2169 ADU R 1/23/2024
1 1 1 NONE No N/A Approved Ministerial
Table A
Cells in grey contain auto-calculation formulas
51
Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law
Applications
10
Housing Development Applications Submitted
514
Jurisdiction Moorpark ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31)Housing Element Implementation
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Table A2
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units
2 3 5 6 8 9 11 12
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Entitlement
Date Approved # of Units issued
Entitlements
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units issued
Certificates of
Occupancy or
other forms of
readiness
Summary Row: Start Data Entry Below 16 296 0 3 0 2 0 3 0 8
512-0-090-115 80-250 High Street High Street Station /
Depot
RPD No. 2018-01,
BLR2022-0558, -
0581, -0503
5+R 10/7/2020
79
4/8/2024 79 0
511-0-141-130 635 Los Angeles
Avenue Green Island Villas RPD No. 2014-02 5+R 2/9/2020
69
0 0
506-0-030-220, 506-
0-030-210, 506-0-
030-235, 506-0-030-
045, 504-0-021-
1958
11930-11934 Los
Angeles Avenue Beltramo Ranch RPD No. 2021-01 SFD O 9/7/2022
47
11/15/2024 2 0
511-0-200-245, 511-
0-020-130, -110, -
160, -170, -180, and
-195
Poindexter and
Casey Road Hitch Ranch
Hitch Ranch Specific
Plan
RPD 2019-01
SFD O 6/15/2022
755
0 0
512-0-061-310, -
320, -050, -060, and
-210
Everett Street and
Walnut Canyon
Everett Street
Terraces RPD No. 2005-02 5+O 9/21/2022
60
0 0
511-0-110-100 145 Casey Road
#1/2 MP 20-167 ADU O 6/29/2020 1 6/29/2020 1 0
511-0-136-035 237 Shasta Avenue
#1/2 MP 20-540 ADU R 9/4/2020
1
9/4/2020 1 0
512-0-124-035 266 Roberts Avenue
1/2 MP 20-850 ADU O 10/21/2020
1
12/10/2020 1 0
507-0-203-105 13490 Vista Levana
Drive #1/2
ZC 2019-157
MP 19-866 ADU R 11/8/2019
1
8/4/2020 1 0
507-0-292-135 3865 1/2 PAINTED
SKY ST MP 20-923 ADU R 5/4/2021
1
7/22/2021 1 0
512-0-133-085 236 1/2 HARRY ST 20-932 ADU O 4/12/2021
1
4/12/2021 1 0
514-0-052-235 14466 1/2 LOYOLA
ST 21-178 ADU R 5/26/2021
1
5/26/2021 1 0
512-0-050-380 78 1/2 Wicks MP20-1036 / ZC
2021-07 ADU O 3/23/2021
1
3/23/2021 1 0
Project Identifier
1
Unit Types Affordability by Household Incomes - Certificates of Occupancy
10
Affordability by Household
Incomes - Completed
Entitlement
Affordability by Household
Incomes - Building Permits
515
2 3 5 6 8 9 11 12
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Entitlement
Date Approved # of Units issued
Entitlements
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units issued
Certificates of
Occupancy or
other forms of
readiness
Project Identifier
1
Unit Types Affordability by Household Incomes - Certificates of Occupancy
10
Affordability by Household
Incomes - Completed
Entitlement
Affordability by Household
Incomes - Building Permits
5120141195 285 1/2 Dorothy
Avenue
22-0516 / BLR2022-
0466 ADU R 4/25/2022
1
4/25/2022 1 0
5120125185 487 1/2 Sherman
Avenue
22-0523 / BLR2022-
0724 ADU R 4/26/2022
1
4/26/2022 1 1 11/20/2023 1
5070203075 13430 1/2 Vista
Levana Drive 22-0727 ADU R 6/20/2022
1
6/20/2022 1 0
5140011355 6412 1/2 Vassar
Circle
22-0777 / BLR2022-
0687 ADU R 6/30/2022
1
6/30/2022 1 0
5140021165 14705 1/2 E
STANFORD ST
22-0841 / BLR2022-
0902 ADU R 6/27/2022
1
1/6/2023 1 1 12/5/2023 1
5120072520 365 1/2 Charles
Street 22-0928 ADU R 9/21/2022
1
9/21/2022 1 0
5120141075 436 1/2 Bard Street 22-0984
BLR2022-0532 ADU R 7/20/2022
1
7/20/2022 1 1 7/26/2024 1
5120125015 240 ESTHER AVE BLR2022-0522 ADU R 11/17/2022
1
11/17/2022 1 0
5140031045
14793 E
STANFORD ST BLR2022-0539 ADU R 10/14/2022
1
10/14/2022 1 1 5/5/2023 1
5040071155
4845 1/2 AVEDON
RD BLR2022-0576 ADU R 10/19/2022
1
1/13/2023 1 0
5110020265 110-190 Casey
Road
Essex / Vendra
Gardens
RPD2012-02 /
BLR2022-0702 /
BLR2022-0709 /
BLR2022-0705 /
BLR2022-0706
5+R 3/1/2017
200
11/5/2024 200 0
5040060145 4864 1/2 Mira Sol
Dr BLR2022-0535 ADU R 5/19/2023
1
5/19/2023 1 0
5140182385 6899 1/2 Chapman
Pl BLR2022-0376 ADU R 7/5/2023
1
7/5/2023 1 0
5040047045 4661 Pepper Mill St BLR2023-0933 ADU R
0
0 0
5050120135
5050120155 3940 Dalaway Dr BLR2023-1076
AP2020-04 SFD R 11/2/2020
1
5/11/2023 1 1 8/6/2024 1
516
2 3 5 6 8 9 11 12
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Entitlement
Date Approved # of Units issued
Entitlements
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units issued
Certificates of
Occupancy or
other forms of
readiness
Project Identifier
1
Unit Types Affordability by Household Incomes - Certificates of Occupancy
10
Affordability by Household
Incomes - Completed
Entitlement
Affordability by Household
Incomes - Building Permits
5120280095 14168 Maya Cir BLR2022-0463 ADU O 2/9/2023
1
2/17/2023 1 1 10/14/2024 1
5120063150 754 1/2 Magnolia St BLR2023-1305 ADU R 5/23/2023
1
6/6/2023 1 0
5110133105 230 1/2 Whitney
Ave BLR2022-0435 ADU R 9/26/2023
1
9/26/2023 1 1 9/10/2024 1
5120125195 463 1/2 Sherman
Ave BLR2022-0886 ADU O 7/20/2023
1
7/20/2023 1 0
5120126095 344 1/2 Sherman
Ave BLR2023-1371 ADU R 8/11/2023
1
8/11/2023 1 1 1/30/2024 1
5110134165 336 1/2 Shasta Ave BLR2023-1060 ADU R 8/22/2023
1
8/22/2023 1 0
5110190285
5110190305 5979 Gabbert Road North Ranch RPD 2016-02 5+O 1/4/2023
134
0 0
5110103130 301 1/2 Cornett
Avenue BLR2023-1905 ADU O 12/6/2023
1
2/8/2024 1 1 4/23/2024 1
5070051135 13336 1/2
Wintergreen Lane BLR2023-1359 ADU R 7/23/2024
1
7/23/2024 1 0
5140012065 14734 1/2 Hartford
Street BLR2023-1938 ADU R 2/22/2024
1
2/22/2024 1 1 8/22/2024 1
5120072220 397 1/2 Charles
Street BLR2023-1261 ADU R
0
0 0
5140012075 14748 Hartford
Street: Unit B BLR2023-1997 ADU R 6/27/2024
1
6/27/2024 1 0
5140012075 14748 Hartford
Street: Unit A BLR2023-1998 ADU R 5/23/2024
1
5/23/2024 1 0
5130032065 14352 Princeton
Avenue BLR2023-2007 ADU R
0
0 0
5120063180 196 Everett Street AP2019-13 /
CD-AP-2024-0009 SFD O 3/7/2024 1 0 0
517
2 3 5 6 8 9 11 12
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Entitlement
Date Approved # of Units issued
Entitlements
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units issued
Certificates of
Occupancy or
other forms of
readiness
Project Identifier
1
Unit Types Affordability by Household Incomes - Certificates of Occupancy
10
Affordability by Household
Incomes - Completed
Entitlement
Affordability by Household
Incomes - Building Permits
5060030245,
5060030255,
5060030180,
5060030205,
5060030195,
5060050515,
5060050525
Los Angeles Avenue
and Leta Yancy
Road
Pacific Communities RPD 2016-01 5+O 9/20/2017
284
0 0
5120010010,
5120010025,
5120010055,
5120010065,
5120160155,
5120160140,
5120020030,
5120020010,
5120030010,
5120030025,
5120050350,
5120050140,
5120050330,
5120040240,
5120040145,
5120040070,
5120040040,
5120040035
Spring Road and
Wicks Road Vistas at Moorpark RPD 2014-01 / CD-
RPD-2024-0012 5+O 3/18/2015
110
0 0
5110110125,
5110110115,
5110110035
Casey Road Casey Road Senior
Community RPD 2013-01 5+O 3/6/2019
390
0 0
5140012035 14690 Hartford St
1/2 BLR2022-0888 ADU R 8/6/2024
1
8/6/2024 1 0
5130140345 6562 High Country
Pl. 1/2 BLR2023-1783 ADU R 1/31/2024
1
1/31/2024 1 0
512-0-134-015 264 1/2 Sarah Ave JADU BLR2024-2485 ADU R 7/15/2024
1
7/15/2024 1 0
5110102150 300 Cornett Ave 1/2 Detached ADU BLR2024-2866 ADU R 12/12/2024
1
12/12/2024 1 0
506-0-121-175 4446 1/2
Summerglen Ct Attached ADU BLR2024-2298 ADU R 10/7/2024
1
10/7/2024 1 0
5140012085 14762 Hartford Garage Conversion
JADU BLR2024-2265 ADU R 5/23/2024
1
5/23/2024 1 0
511-0-170-535 12435 Olympus
Street
Garage Conversion
JADU BLR2024-2620 ADU R 12/19/2024
1
12/19/2024 1 0
513-0-200-265 7358 Hightop St 1/2 Garage/Casita
Conversion ADU BLR2024-2169 ADU R 2/21/2024
1
2/21/2024 1 1 10/15/2024 1
512-0-072-220 397 Charles 1/2 Detached ADU BLR2024-2251 ADU R 11/6/2024
1
11/6/2024 1 0
5110133115 250 Whitney 1/2 Detached ADU BLR2022-0887 ADU R 8/6/2024
1
8/6/2024 1 0
512-0-061-260 TBD SFD AP 2022-09 / CD-
AP-2024-0012 SFD O 7/3/2024
1
0 0
518
2 3 5 6 8 9 11 12
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Entitlement
Date Approved # of Units issued
Entitlements
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units issued
Certificates of
Occupancy or
other forms of
readiness
Project Identifier
1
Unit Types Affordability by Household Incomes - Certificates of Occupancy
10
Affordability by Household
Incomes - Completed
Entitlement
Affordability by Household
Incomes - Building Permits
512-0-072-645 TBD SFD CD-AP-2024-0013 SFD O
0
0 0
512-0-072-645 256 1/2 2nd Street Detached ADU BLR2024-2603 ADU R
0
0 0
514-0-011-015 6407 Creighton
Circle
Garage Conversion
ADU BLR2024-2203 ADU R
0
0 0
502-0-230-255 7318 1/2 Nicklaus
Road Detached ADU BLR2024-2630 ADU R
0
0 0
511-0-110-080 323 1/2 Casey Road Detached ADU BLR2024-3070 ADU R
0
0 0
512-0-132-195 385 1/2 Sarah
Avenue
Garage Conversion
ADU BLR2024-2732 ADU R
0
0 0
511-0133-065 213 Sierra Avenue Garage Conversion
JADU BLR2024-2975 ADU R
0
0 0
511-0-133-065 213 1/2 Sierra
Avenue Attached ADU BLR2024-2975 ADU R
0
0 0
512-0-141-105 431 Millard Garage Conversion
JADU BLR2024-2992 ADU R
0
0 0
514-0-011-085 6458 1/2 Creighton
Circle Detached ADU BLR2024-2837 ADU R
0
0 0
513-0-032-065
14352 1/2 E. Los
Angeles Avenue
(Princeton Avenue)
Detached ADU BLR2024-3030 ADU R
0
0 0
507-0-033-085 13558 E. Cedarpine
Lane
Garage Conversion
JADU BLR2024-2894 ADU R
0
0 0
513-0-032-065 14352 Prnceton
Avenue
Garage Conversion
ADU BLR2024-2894 ADU R
0
0 0
514-0-022-035 6440 Cornell Circle Garage Conversion
JADU BLR2024-0829 ADU R
0
0 0
513-0-240-035, 513-
0-240-045 TBD Canyon Crest CD-TTRM-2024-
0005 5+O
0
0 0
0 0 0
0 0 0
519
Jurisdiction Moorpark ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31)Housing Element Implementation
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
1 Projection Period 3 4
RHNA Allocation by
Income Level
Projection Period -
06/30/2021-
10/14/2021
2021 2022 2023 2024 2025 2026 2027 2028 2029 Total Units to
Date (all years)
Total Remaining
RHNA by Income
Level
Deed Restricted - - - - 60 - - - - -
Non-Deed Restricted 2 3 3 2 1 - - - - -
Deed Restricted - - - - 138 - - - - -
Non-Deed Restricted 2 - 10 4 3 - - - - -
Deed Restricted - - - - 12 - - - - -
Non-Deed Restricted - - 1 6 10 - - - - -
Above Moderate 434 - - - - 72 - - - - - 72 362
1,289
4 3 14 12 296 - - - - - 329 960
5 6 7
Extremely low-Income
Need 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total Units to
Date
Total Units
Remaining
189 - - - 60 - - - - - 60 129
76
Please note: For the last year of the 5th cycle, Table B will only include units that were permitted during the portion of the year that was in the 5th cycle. For the first year of the 6th
cycle, Table B will only include units that were permitted since the start of the planning period. Projection Period units are in a separate column.
Total RHNA
Total Units
Income Level
Very Low
Low
Extremely Low-Income Units*
Note: units serving extremely low-income households are included in the very low-income RHNA progress and must be reported as very low-income units in section 7 of Table A2. They must also be reported in the extremely
low-income category (section 13) in Table A2 to be counted as progress toward meeting the extremely low-income housing need determined pursuant to Government Code 65583(a)(1).
*Extremely low-income housing need determined pursuant to Government Code 65583(a)(1). Value in Section 5 is default value, assumed to be half of the very low-income RHNA. May be overwritten.
Progress toward extremely low-income housing need, as determined pursuant to Government Code 65583(a)(1).
Please Note: Table B does not currently contain data from Table F or Table F2 for prior years. You may login to the APR system to see Table B that contains this data.
Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact
HCD staff at apr@hcd.ca.gov.
216
71
This table is auto-populated once you enter your jurisdiction name and current year data. Past
year information comes from previous APRs.
29 Moderate
377
233
245
Please contact HCD if your data is different than the material supplied here
157
2
Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
306
520
Jurisdiction Moorpark ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31)Housing Element Implementation
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Date of Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of Rezone Very Low-
Income Low-Income Moderate-Income Above Moderate-
Income
Rezone Type Parcel Size
(Acres)
General Plan
Designation Zoning Minimum
Density Allowed
Maximum
Density Allowed
Realistic
Capacity Vacant/Nonvacant Description of Existing
Uses
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
83
Project Identifier RHNA Shortfall by Household Income Category Sites Description
1
Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law
Table C
521
Jurisdiction Moorpark
Reporting Year 2024 (Jan. 1 - Dec. 31)
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation
1. Historic Preservation
Initiate a general identification and assessment of historic resources in the downtown to assist in determination of the
need for more formal preservation activities. Work with Moorpark Historical Society and other local and regional
partners to assist in identifying resources. Explore programs to assist the City in preserving historic resources or older
housing that is of local importance.
2021-2029 Ongoing - Assessment of potential historic resources. Downtown will be considred as part of the Downtown Specific
Plan Update.
2. Housing Rehab
Seek, apply for, and allocate funding for housing rehabilitation program. Develop program to include assistance for
ownership units, mobile homes, and rental units. Contact nonprofits capable of making home repairs and/or assisting in
financial assistance on an annual basis.
2021-2029
The City of Moorpark, through its partnership with the County of Ventura, participates in the Habitat for Humanity's
Home Repair Program. The program allows residents to apply for up to $25,000 per household for major repairs to
owner-occupied homes. The program is an ongoing program that the city will continue to support.
3. Code Compliance
Require adherence to local property regulations and requirements. Ensure that new housing meets state building codes,
including green building designs. Conduct code compliance inspections totaling an average of up to 150 residences on
an annual basis. Implement new Energov system to track code compliance cases, building permit issuance, and
entitlements.
2021-2029 Code Compliance Technician completed a total of 56 inspections on residences during 2024. Energov implemented in
2023 to track code compliance cases, building permit issuance, property details, and entitlements.
4. Capital Improvement Plan
Prepare, implement, and report progress of the CIP to City Council to improve community infrastructure. Develop GIS-
based pavement management system to guide street maintenance and repair. Target efforts, to the extent feasible, to
areas which have experienced disinvestment.
2021-2029 CIP is presented to City Council annually as part of the budget. The Pavement Management Program was accepted by
City Council in October and is in process of implementation.
5. Inclusionary
Housing/Nexus Study/Fee
Conduct a nexus study as prerequisite to design an inclusionary requirement. Draft and adopt the inclusionary housing
program and expenditure priorities. Monitor program effectiveness on an annual basis.2021-2029 The City adopted a zoning code update in 2023 that included a 15% inclusionary housing requirement. The City is also
preparing an in-lieu fee study and anticipates a City Council public hearing for adoption by Spring, 2025.
6. Affordable Housing Trust
Fund
Develop and adopt AHTF program parameters. Seek mechanism to establish, grow, and maintain the affordable
housing trust fund. Issue RFQs and fund an affordable housing in conjunction with the City's acquisition, land
assemblage, and disposition program to further affordable housing goals and priorities.
2021-2029
Staff anticipates receiving land and funds from projects like Pacific Communities, Hitch Ranch, and Beltramo Ranch for
the future development of City sponsored affordable housing. The AHTF program will be evaluated at that time but staff
has reached out to a regional trust fund to discuss participation.
7. Assist in Development of
Affordable Housing
Recruit a new Program Manager, Housing, or equivalent position to implement housing program. Develop the City' s
affordable housing assistance program, including funding and revenue stream. Fund affordable housing projects that
achieve the goals of the Housing Element and General Plan.
2021-2029
Completed - A Management Analyst was hired in 2023 to oversee the housing programs within the City and prepare
related work plan.
8. Housing Choice Voucher
(Section 8)
Participate in the housing choice voucher program and refer eligible households to the AHACV for rental vouchers.
Publicize program through a housing resource brochure and on the City' s website, including outreach and education on
the state' s source of income protection (SB 329, SB 222). Publicize housing choice program to homeowners every two
years to maintain at least 189 vouchers issued by the AHACV and encourage participation.
2021-2029 Section 8 housing information is being publicized through housing resources and outreach to the general public and
interested parties lists. In 2024, AHA issued and additional 93 vouchers.
9. Home-ownership
Assistance
Retool the homeownership program, focusing on moderately priced single- family homes, condominiums, and
townhomes. Prioritize funds and opportunities to residents and those working or attending educational institutions in the
City. Apply for up to two funding grants before 2025 and two after 2025; and if successful, seek to assist up to 10
households during the planning period.
2021-2029 Ongoing discussions with Moorpark College regarding possible housing opportunities being constructed on campus.
City staff has met with County staff to discuss funding and grant opportunities.
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.
Table D
Program Implementation Status pursuant to GC Section 65583
522
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation
10. Affordable Housing
Preservation
Periodically initiate and maintain discussions with owners of affordable housing properties as to their needs. As feasible,
identify and/ or offer options to maintaining the long- term affordability of the properties. If needed, coordinate technical
assistance and education to tenants and work with owners regarding proper notification procedures should properties
become at risk of conversion. Prepare an annual report for the Planning Commission, City Council, stakeholders, and
the public regarding status and progress in achieving housing goals.
2021-2029
Staff prepares and circulates a quarterly report of affordable housing project status, as well as presents an annual
housing report to stakeholders. In 2024, staff reached out to current affordable housing homeowners to provide
information and resources. Staff plans on continuing education and open lines of communication with affordable housing
homeowners.
11. Downtown Specific Plan
Continue to implement the Downtown Specific Plan and support the introduction of residential, mixed uses, and other
land uses within the area. Revise and adopt updated Downtown Specific Plan to include objective development and
design standards in accordance with Gov' t Code§§ 65913 and 66300.
2021-2029 Ongoing. Staff intends to circulate an RFP for the Downtown Specific Plan update in February 2025.
12. Objective Development
Design Standards
Prepare and adopt objective development and design standards (zoning, subdivision, or design review) for all projects in
accordance with Gov't Code §65913 and 66300.2021-2029 Completed. Objective Design Standards were adopted in 2023 with the comprehensive zoning ordinance updates.
13. Housing Sites Inventory
Maintain inventory of residential sites needed to address the 2021- 2029 RHNA; periodically review list of sites for
compliance with no-net-loss requirement. Allow by- right residential projects consistent with zoning that offers 20% of
units affordable to low- income households and are proposed on sites from the 2014- 2021 Housing Element. If housing
products and affordability levels are different than anticipated and cause a shortfall in the RHNA, redesignate sites
within 180 days to address the shortfall.
2021-2029 Staff is working to coordinate a map with sites listed in the housing element. Update project maps on a quarterly basis.
14. Developer Outreach
Outreach to property owners and developers of pipeline projects as a means to identify and address potential obstacles
to developing their property. Support funding applications (e. g., tax credit, bonds) to help applicants be awarded local,
state, and federal monies. Continue to coordinate with applicants using a Conditions Compliance Checklist" to approve
stages of the project and ensure remaining conditions are followed.
2021-2029 Ongoing
15. Accessory Dwelling
Units
Amend zoning code to permit ADUs as a by- right use on any lot that allows single- or multifamily housing or mixed- use
zone in accordance with Government Code 65852. 2(a). Record progress in ADU production on the annual progress
report for the Housing Element by April 1 of each year, monitor every year and, if production falls short and shortfall in
sites become apparent, take measures to rezone sites or other actions to address shortfall within six months. Review
and implement options for encouraging ADU productions, such as prototype plans, fee waivers, expedited procedures,
and affordability monitoring programs.
2021-2029
Completed - On July 19, 2023, City Councill approved a zoning code update which incorporated ADU regulations
aligned with California Government Code. The City is currently preparing updated ADU application, checklist and forms
for use by applicants to more efficiently apply and obtain permits for ADUs. The City expects to provide expanded ADU
permitting information and resources online.
16. Single-family, Mobile
Homes and Mfgr Homes
Remove the references to potentially restricting single-family residential units designed or used exclusively to one family
to address any potential fair housing. Review and, as need, revise provisions for mobile homes and factory- built
housing in accordance with Government Code§ 65852. 3 and other provisions of state law.
2021-2029
Completed - On July 19, 2023, the City Councill approved a zoning code update which incorporated revisions to
language in the zoning code removing restrictions to Single-Family residential land uses, expanding residential density
in many residential zone districts and updated language related to mobile homes and factory-built homes to align with
California Government Code to address fair housing concerns.
17. Homeless Services
Support a more robust point- in- time count of people experiencing homelessness in the county and city to obtain more
accurate information for planning purposes. Amend zoning code to modify parking standards for shelters and reduce the
500 spacing requirements to 300 feet as required by Gov' t Code §§65583 (a)(4) (A)(ii) and (v). Amend zoning code to
clarify the process and the zones where transitional and supportive housing is permitted in accordance with Gov' t
Codes§ 65583 (4) (A) (ii) and § 65651. Amend zoning code to permit Low- Barrier Navigation Center by- right in areas
zoned for mixed uses and nonresidential zones permitting multifamily uses (Gov' t Code § 65662.).
2021-2029
Completed - City staff participated in the County of Ventura Point-in-Time Count and routinely attends the County of
Ventura Continuum of Care Alliance meetings. On July 19, 2023, The City Council approved the zoning code update
which included updates to transitional and supportive housing. The zoning code now permits, by right, that both uses
are allowed in all residential and mixed-use zones consistent with California Government Code § 65583 (4) (A) (ii) and §
65651. The zoning code update, adopted in 2023, included low barrier navigation centers as a permissible use in the
mixed-use zones, which are zones that allow commercial and multifamily uses which is consistent with California
Government Code § 65662.
18. College Housing
Services
Support the College' s efforts to apply for a housing planning feasibility study; if study demonstrates a need, support
college in application for a construction grant. Support housing initiatives to address student and faculty needs. Assist in
the development of housing attainable to this group.
2021-2029 Staff consulted with Moorpark College regarding potential student housing programs, including identifying potential
locations and assisting with the College’s grant requests.
523
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation
19. Housing for Seniors and
Disabled People
Amend zoning code to define and permit residential care facilities serving six or fewer clients in accordance with the
Health and Safety Code § 1502 et seq. Assist developers, homeowners, and others at the planning and building safety
counter regarding how to incorporate universal/ accessible housing features and/ or reasonable accommodation
process; publicize and advertise the housing directory and reasonable modification process via web, email, etc. Seek to
assist at least 10 parties/ individuals over the planning period. Support efforts to provide community support services;
expand affordable/ accessible transit and community walkability in accordance with the City' s transition plan.
2021-2029
The zoning code update, adopted in 2023, included residential care facilities as a by right use time type in all residential
and mixed use zones, consistent with the definition in California Health and Safety Code § 1502 et seq. The City
Planning and Building Divisions respond to requests from the public and contractors regarding accessibility and
accommodation requests. The City’s Housing Division, in 2023, increased public outreach regarding the City’s First
Time Home Buyer Program and other affordable housing resources within the community, helping to advertise the
County’s Housing Vouchers Program, Housing Right’s Center workshops and other resources as they become
available.
The City’s Public Transit Division expanded free and subsidized transit options on local busses for youth and senior
riders for travel within the County of Ventura. The City also continues to provide Dial-A-Ride services for seniors and
disabled persons for travel in the eastern Ventura County. The City also continues to provide services to seniors and
other adults at the Active Adult Center, which include food delivery services, tax preparations services, an equipment
loan program, legal guidance, utility assistance, advocacy, and entertainment and social opportunities. The City’s Public
Works Department is currently managing the expansion of Princeton Avenue, which will include new sidewalks and bike
lanes along a roadway connecting the east and west parts of the City. The City offers an on-demand rideshare micro-
transit program to the general public. This service allows travel within the City and has over 100 stops that is easily
accessible and only a 5 minute walk from anywhere in the City. This program enables our transit service to reach
residential neighborhoods where our typical larger fixed route buses are unable to reach. This program closes the gap
between first and last mile travel for transit users and allows better connectivity to other regional transit services in the
County.
20. Farmworker Housing
Amend zoning code to define and permit employee housing as a by- right use in zones allowing single- family housing in
accordance with Health and Safety Code § 17021. Work with County-led coalition to support, fund and implement a
countywide survey of farmworkers, employers, and housing providers to define housing conditions, needs, and barriers.
Use results to develop targeted programs and strategies to address the verified needs of farmworkers and to support
agricultural businesses with a stable and healthy workforce.
2021-2029
In 2023, the City Council adopted a zoning code update that includes farmworker housing, defined as part of “dwelling,
employee housing”, as a permissible use in all residential only zones with a ministerial permit. On July 2022, the City
Council approved a Memorandum of Understanding with the County of Ventura to conduct a Farmworker Housing
Survey and contribute $9,000 towards conducting the survey, which was paid in January 2023. The Farmworker
Housing Survey was completed by the County’s consultant. They are now in the process of developing a countywide
farmworker housing study and action plan, which expects to be completed by 2026.
21. Developer Fee Study
Review residential development- related fees to determine their appropriateness (nexus), amount charged, and
reasonableness; revise fees based on findings. Periodically assess the cumulative impact of all fees and service
charges and make revisions as needed to achieve cost recovery and further City goals and objectives.
2021-2029 Completed - A comprehensive nexus study and fee update was adopted by the City Council in 2023.
22. Land
Acquisition/Consolidation/Di
sposition
Continue to acquire, consolidate, and dispose of land in return for the production of deed- restricted affordable housing.
As assets are acquired, periodically release an RFQ to advertise land sale or lease for deed- restricted affordable
housing. Create a publicly accessible map which includes sites that are acquired, being consolidated, or otherwise being
disposed of for affordable housing purposes.
2021-2029
Ongoing. Land from Redevelopment Agency is in the process of being sold for the development of housing. The City
also anticipates receiving land from projects (Pacific Communities and Hitch Ranch) where development agreements
require dedication of land to the City for affordable housing.
23. Regulatory Assistance
Review and revise the City' s density bonus regulations to ensure consistency with changes in state law (e. g. AB 2345)
over the past planning period. Review the administrative exception ordinance and add authority to allow additional
flexibility in other specific development standards cited as potential constraints.
2021-2029 Completed - In 2023, a comprehensive zoning code update was completed to align density bonus and other relevant
housing provisions with State Law.
24. Permit Process
Streamlining
Review and revise the R- P- D permit process to remove threshold of 5+ units, and review and revise as needed the
approving authority, criteria, and other provisions. Review other administrative and conditional permit processes as part
of the overall update of the zoning code following adoption of the General Plan. Continue to implement regulatory and
management measures recommended from the 2020 City' s management audit of planning and permitting processes in
the City.
2021-2029 Completed - In 2023, a comprehensive zoning code update provided permit streamlining pursuant to General Plan and
2020 Management Audit recommendations.
25. Zoning Code Update
Review and revise land use designations and zoning districts to implement the updated General Plan. Identify required
changes to the municipal codes for compliance with state and federal statutes, including building, safety, land use, and
permitting requirements. Modify municipal codes (Programs 15- 20) to further fair housing, including allowing residential
care facilities serving seven or more clients as a by- right use in residential zones.
2021-2029 Completed - On July 19, 2023, the City Council approved a comprehensive Zoning Code Update which incorporated
numerous regulatory updates to comply and align zoning with federal and state regulations.
524
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation
26. Water and Sewer Priority
Provide adopted 2021- 2029 Moorpark Housing Element to the Ventura County Water Works District 1 within 30 days of
adoption for inclusion in its planning projections. Coordinate with Ventura County to ensure affordable housing receives
priority water and sewer service if and when development is restricted by capacity shortages.
2021-2029 Completed - The Housing Element was shared with Ventura County Water Works District staff. Continually meet on
projects with the District to coordinate and clarify when and if affordability plays a role in their permit review.
27. Collaborative Partners
Meet with housing partners (e.g., county, developers, stakeholders, realtors) to augment existing administrative and
financial resources and coordinate on future projects. Produce and update a brochure advertising all services provided
by City partners and publicize on the City' s web page. Update annually.
2021-2029
Staff continue to meet with developers that are in process or inquiring about new or revised projects. Staff encourages
pre-screening applications which allows an applicant to formally obtain project comments before completing a formal
project application.
28. Fair Housing
Implement initiatives in Table 4- 28 of the Housing Element to affirmatively further fair housing. Contract with Fair
Housing agency to provide services and assess the need for changing level or mix of services. Report progress as part
of the Annual Progress Report for the Housing Element and annually review contract for needed program changes.
2021-2029 The initiative described in table 4-28 are addressed throughout the housing element objectives as described on this
report. The City has a partnership with the Housing Rights Center to provide fair housing services to residents.
29. Place-based Program
Facilitate completion of the Vendra Gardens and the Aldersgate housing projects from 2023 to 2025. Allocate $8 million
in ARPA funds to develop a new City Library to commence in 2023. Refurbish and replace playgrounds citywide,
including the greater downtown by 2025/2026. Continue to seek other community development projects for the greater
downtown. Update the General Plan Safety Element, incorporating Ventura County' s Multi-Hazard Plan, Fire Strategic
Plan, and FEMA flood plans; identify and maintain evacuation routes to ensure safety for residents, business, and
animals; and integrate with City' s Emergency Operation Plan as required.
2021-2029
Vendra Gardens project is currently under construction, with an estimated completion in 2025. Owner of Aldersgate
Senior Living Project is currently in escrow to sell the property and project to a new developer. The City will continue to
help facilitate completion of both projects in the coming year.
On September 21, 2022, the Moorpark City Council allocated $5,688,798 in funds from ARPA to the new City Library.
The proposed City Library is scheduled to go to Planning Commission in 2024. Applications for grading and building
permits are expected to be submitted in mid-2024. In 2023, the Parks, Recreation, and Community Services
Department was awarded an additional $750,000 of federal funding to go toward the construction of the new library.
Funds have been budgeted by the Parks, Recreation, and Community Services Department for park replacement and
refurbishment projects. Planning efforts for an inclusive playground are expected to begin in late 2024.
On May 3, 2023, the City Council adopted the General Plan 2050 (GP) which incorporates updated hazard and risk
planning goals and policies. The GP includes a Safety Element which incorporates goals and policies associated with
emergency management, hazards and risks due to fire, flood, seismic and geology, severe weather and other safety
concerns. The GP includes reference to the County’s Multi-hazard Mitigation Plan and Strategic Fire Plan, and FEMA
flood plans. The GP also incorporates an Evacuation Routes Map.
30. Parking Mangement
Amend zoning code to align ADU requirements with Gov' t Code§ 65852. 2(a); make other code amendments, including
parking, to comply with state law. Amend zoning code to make parking standards for emergency shelters consistent with
Gov' t Code§ 65583a) (4) (A) (ii); clarify transitional/ supportive housing parking. Develop a process and standard to
address parking requirements for mixed use that accommodate parking needs of both uses in a flexible and market
driven manner. Update City' s density bonus ordinance, including provisions for modified parking spaces, to comply with
recently enacted state law (AB 2345, SB 290, and others). Amend municipal code to allow for administrative reduction in
parking space requirements pursuant to applicant' s parking study, forward staff recommendations to the appropriate
project hearing body for consideration. To ensure City parking requirements are not a constraint to residential
development, especially new housing units affordable to lower and moderate- income households, the City shall
continue to review and monitor all parking requirements and specifically requirements for 1. 75 spaces for 1- bedroom
multifamily housing. If it is determined that this requirement is not in line with regional requirements or is a constraint to
the development of housing, the City will revise their parking requirements, as appropriate.
2021-2029
Completed - On July 19, 2023, the City Councill approved a zoning code update which incorporated ADU regulations
aligned with California Government Code § 65852.
The zoning code update in 2023 updated the required parking section to align with Gov' t Code§ 65583 (a)(4)(A)(ii) to
include emergency shelters, grouped with similar uses already in the code that included residential care facilities,
transitional shelters, and transitional housing. The parking required of these uses is similar to other residential and
commercial uses.
The City’s Density Bonus requirements, noted in Municipal Code Chapter 17.64, refer to applicable California
Government Codes sections 65915 et seq, for current or applicable ratios of parking that can be requested as part of a
Density Bonus Request.
The zoning code update in 2023 introduced parking reliefs in Municipal Code Section 17.32.130, which provides parking
reductions when certain requirements or analysis are provided. Requests for parking relief would be considered by the
approval body required for the requested use, which may be considered ministerially by staff. Forms of parking relief
include shared parking, off-site parking, compact parking dimensions, decreases in number of total number of parking
spaces, and waiver of garage or covered parking. The City will continue to monitor and review the application of parking
standards on affordable and multi-family housing to ensure that applicable parking standards are not detrimental to
housing production.
525
Jurisdiction Moorpark ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2024 (Jan. 1 - Dec. 31)Housing Element Implementation
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+Local Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7
Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
526
Jurisdiction Moorpark
Reporting Period 2024 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 10/15/2021 - 10/15/2029 ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
2 3 4
APN Street Address Project Name+Local Jurisdiction
Tracking ID+
Realistic Capacity
Identified in the
Housing Element
Entity to whom the site
transferred Intended Use for Site
1
Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation
formulas
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of
Project Identifier
NOTE: This table must only be filled out if the housing element sites
inventory contains a site which is or was owned by the reporting
jurisdiction, and has been sold, leased, or otherwise disposed of
during the reporting year.
527
Jurisdiction Moorpark Note: "+" indicates an optional field
Reporting Period 2024
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Designation Size Notes
1 2 3 4 5 6 7
APN Street Address/Intersection Existing Use Number of
Units
Surplus
Designation
Parcel Size (in
acres)Notes
511-0-030-300 1063 Walnut Canyon Road Vacant 0 Surplus Land 0.25 See Resolution No. 2022-4091
511-0-030-290 1073 Walnut Canyon Road Vacant 0 Surplus Land 0.25 See Resolution No. 2022-4091
511-0-030-280 1083 Walnut Canyon Road Vacant 0 Surplus Land 0.26 See Resolution No. 2022-4091
511-0-030-270 1095 Walnut Canyon Road Vacant 0 Surplus Land 0.26 See Resolution No. 2022-4091
511-0-030-260 1113 Walnut Canyon Road Vacant 0 Surplus Land 0.26 See Resolution No. 2022-4091
511-0-030-250 1123 Walnut Canyon Road Vacant 0 Surplus Land 0.26 See Resolution No. 2022-4091
511-0-040-140 1293 Walnut Canyon Road Vacant 0 Surplus Land 0.26 See Resolution No. 2022-4091
511-0-040-130 #### Walnut Canyon Road Vacant 0 Surplus Land 0.26 See Resolution No. 2022-4091 No
formal address assigned to lot
511-0-040-120 1331 Walnut Canyon Road Vacant 0 Surplus Land 0.26 See Resolution No. 2022-4091
NOTE: This table must contain an invenory of ALL
surplus/excess lands the reporting jurisdiction owns
Summary Row: Start Data Entry Below
Parcel Identifier
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table H
Locally Owned Surplus Sites
For Ventura County jurisdictions, please format the APN's as follows:999-9-999-999
528
Jurisdiction Moorpark ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2024 (Jan. 1 - Dec. 31)Housing Element Implementation
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Project Type Date
2 3
APN Street Address Project Name+Local Jurisdiction
Tracking ID+
Unit Category
(SH - Student Housing)Date Very Low- Income
Deed Restricted
Very Low- Income
Non Deed
Restricted
Low- Income Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate- Income
Deed Restricted
Moderate- Income
Non Deed
Restricted
Above
Moderate-
Income
Summary Row: Start Data Entry Below
Not
Cells in g
Table J
Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915
Project Identifier Units (Beds/Student Capacity) Approved
1 4
NOTE: STUDENT HOUSING WITH DENSITY BONUS ONLY. This
table only needs to be completed if there were student housing
projects WITH a density bonus approved pursuant to
Government Code65915(b)(1)(F)
Annual Progress Report 529