MEMORANDUM
TO: The Honorable City Council \ -,�-_
FROM: R. Dennis Delzeit, City Engineer biter -
DATE: April 5, 1988 (�
SUBJECT: Shell Oil Pipeline Along Los Angeles Avenue
BACKGROUND INFORMATION
In response to Council concerns, the letter dated March 28,
1988, copy attached, was sent to Shell Oil Company. On
April 5, 1988, Mr. Rick Sellen and Mr. Roger Underwood (copy
of their cards are attached) met with the City Engineer and
discussed the City's concerns.
Attached is a copy of Shell Oil Company's written response
to the City Engineer's letter dated March 28, 1988. In
addition, the City Engineer was furnished with the following
information:
1. "West Coast Division (Pipelines) - Products
Southern District Emergency Plan", dated December
1987, prepared by the Shell Oil Company. One copy
has been furnished to the City Manager and one
copy has been filed with the City Clerk.
2. Plan and profile sheets (26) showing the location
of the pipeline within the City limits of
Moorpark. These plan sheets are on file in the
office of the City Engineer.
3. A copy of the California Pipeline Safety Act
entitled "Part 195, Transportation of Hazardous
Liquids by Pipeline". This document is furnished
to the City Clerk and is on file.
799 Moorpark Avenue Moorpark, California 93021 (805) 529-6864
Page -2-
RECOMMENDED ACTION
It is recommended that the City Council receive and file
this information.
MOORPARK, CALIFORNIA
City Council Meeting
of HO— 198._
UAJCTION: 2B Q✓
ey�5AU�S��
RDD:ls
Encl.
cc: Pat Richards, Planning Director
Lt. Mike Brown, County Sheriff's Department
Stan Rapp, Asst. Fire Chief
John F. Knipe, Asst. City Engineer
Mark Wessel, Senior Engineer
JN 3400
CM0721.COU
OORPARK ,
•
M
JOHN GALLOWAY • STEVEN KUENY
Mayor City Manager
ELOISE BROWN •
CHERYL J.KANE
Mayor Pro Tem City Attorney
CUNT HARPER.Ph.D. PATRICK RICHARDS,AI.C.P.
Councilmember S ,- Director of
JOHN PATRICK LANE � Community Development
Councilmember R DENNIS DELZER
MAUREEN W.WALL
City Engineer
City Clerk JOHN V.GILLESPIE
THOMAS P.GENOVESE Chief of Police
City Treasurer
March 28, 1988
JN 3400
•
•
Mr. R. N. Underwood
Shell Oil Company
West Coast Pipelines
Southern Division
2459 Redondo Avenue
Long Beach, CA 90806
Subject: Shell Oil Pipeline along Los Angeles Avenue
Dear Mr. Underwood:
The City Council of Moorpark is asking for your
assistance in answering the following questions and concerns
that have been raised regarding the recent maintenance on
the Shell Oil pipeline which runs along Los Angeles Avenue
in Moorpark:
• 1. • •What is the age of the line and is there a
replacement program?
2... Can you give us a description of the maintenance
program?
3 . . How does Shell Oil detect leaks to
a. Avoid a Long Beach explosion type situation.
•
b. Avoid pollution of the sub-surface and ground
water.
4 . What is Shell Oil's contingency plans in the event
of a leak or other potential or real disaster?
•
5. Is the line used 24 hours a day?
6. What is the depth and size of the line?
799 Moorpark Avenue Moorpark, California 93021 (805) 529-6864
Page -2-
In advance, thank you for your assistance and if you
should have any questions, please don't hesitate to call me
at (805) 653-6597.
Very truly yours,
CITY OF MOORPARK
,�1-sn1e2
R. Dennis Delzeit
City Engineer
RDD:jg
cc: Steve Kueny, City Manager
Pat Richards, Director of Community Development
Joh F. Knipe, Assistant City Engineer
JN 3400
BM0494 .Ltr
•
R.L SELLEN
Southern District
(PlPelnres)-Produns 2459 Redondo Avenue
West Coast Division LONG BEACH.CA 90306
SHELL OIL COMPANY (213)427-6931
ROGER N. UNDERWOOD
Superintendent
SouthernDistrict 2459 Redondo Avenue
(West Products
s LONG BEACH.CA 908D6
West Coast Division 213 <2i-2969
SHELL OR COMPANY ( )
_
REFERENCE: MOORPARK CITY ENGINEERS' CORRESPONDENCE TO SHELL
OIL COMPANY DATED MARCH 28, 1988
1. WHAT IS THE AGE OF THE LINE AND IS THERE A REPLACEMENT
PROGRAM?
INSTALLATION DATES OF LINE WITHIN THE CITY OF MOORPARK
VARY FROM 1927 TO 1987; HOWEVER, AGE OF PIPE IS NOT
NECESSARILY RELATED TO INTEGRITY OR CONDITION. NUMEROUS
SECTIONS OF LINE HAVE BEEN REPLACED OVER THE YEARS FOR
MAINTENANCE PURPOSES AND IN CONJUNCTION WITH STATE HIGHWAY
IMPROVEMENT PROJECTS.
ADDITIONAL REPLACEMENTS ARE ANTICIPATED AS REMAINING
SECTIONS OF HIGHWAY 118 ARE WIDENED TO PLANNED WIDTH.
2. CAN YOU GIVE US A DESCRIPTION OF THE MAINTENANCE PROGRAM?
THIS LINE IS MAINTAINED IN ACCORDANCE WITH PART 195 OF
U. S. DEPARTMENT OF TRANSPORTATION PIPELINE SAFETY
REGULATIONS. THESE REGULATIONS ADDRESS ALL ASPECTS OF
PIPELINE MAINTENANCE INCLUDING OPERATIONS, MAINTENANCE AND
EMERGENCY PROCEDURES, INTERNAL AND EXTERNAL CORROSION
CONTROL, PIPELINE REPAIRS, OVERPRESSURE SAFETY DEVICES,
MAXIMUM OPERATING PRESSURES , ETC. (SEE ATTACHED COPY OF
CODE) . IN ADDITION TO ABOVE, PERIODIC HYDROSTATIC PRESSURE
TESTS ARE REQUIRED UNDER THE CALIFORNIA PIPELINE SAFETY
ACT OF 1981. ACCORDINGLY, THIS LINE IS SCHEDULED TO BE
TESTED WITHIN THE NEXT FEW WEEKS. THE LINE WILL BE FILLED
WITH WATER FOR THIS TEST AND A REPRESENTATIVE FROM THE
STATE FIRE MARSHAL' S OFFICE WILL BE IN ATTENDANCE TO
REVIEW PROCEDURES AND WITNESS THE TEST.
3. HOW DOES SHELL DETECT LEAKS?
OPERATION OF THIS LINE IS MONITORED BY A COMPUTER
CONTROLLED LINE INTEGRITY SYSTEM. THIS COMPUTER REMOTELY
MONITORS METERS AND OTHER FIELD DEVICES TO MEASURE FLOW IN
THE PIPELINE AND DETECT POSSIBLE RELEASES. THE COMPUTER IS
LOCATED AT OUR CONTROL CENTER IN ANAHEIM, CALIFORNIA,
WHICH IS STAFFED ON 24 HOUR A DAY BASIS. ADDITIONALLY, THE
LINE IS RIDDEN APPROXIMATELY FIVE ➢AYS A WEEK AND IS FLOWN
TWICE A MONTH.
4. WHAT IS SHELL OIL' S CONTINGENCY PLANS IN THE EVENT OF
A LEAK OR OTHER POTENTIAL OR REAL DISASTER?
SHELL PERSONNEL AT OUR ANAHEIM CONTROL CENTER CAN SHUT
OFF PUMPS AND CLOSE MOTOR OPERATED VALVES STRATEGICALLY
LOCATED ALONG THE LINE IN THE EVENT OF A SUSPECTED
RELEASE. MAINTENANCE PERSONNEL LIVING IN MOORPARK, SIMI
AND VENTURA AREAS ARE AVAILABLE TO RESPOND TO ANY PROBLEM
ON A 24 HOUR A DAY BASIS. ADDITIONALLY, SHELL MAINTAINS A
RELATIONSHIP WITH VENTURA COUNTY FIRE DEPARTMENT AND THE
STATE FIRE MARSHAL WHEREIN ANY EMERGENCY WOULD EVOKE A
COORDINATED RESPONSE.
5. IS THE LINE USED 24 HOUR A DAY?
YES
6. WHAT IS THE DEPTH AND SIZE OF THE LINE?
THE AVERAGE DEPTH OF THE LINE VARIES FROM APPROXIMATELY
THIRTY INCHES TO SIXTY INCHES.
INTERNAL DIAMETER VARIES FROM 4" TO 6" .