HomeMy WebLinkAboutAGENDA REPORT 2025 0716 CC REG ITEM 08A SUPPLEMENTAL
MOORPARK CITY COUNCIL
SUPPLEMENTAL
AGENDA REPORT
TO: Honorable City Council
FROM: Doug Spondello, Community Development Director
BY: Areli Perez, Associate Planner II
DATE: 07/16/2025 Regular Meeting
SUBJECT: Consider Zoning Ordinance Amendment No. CD-ZCA-2025-0006 to
Modify Table 17.20.060(E)(8) of the Moorpark Municipal Code to
Prohibit Energy Storage within a Building in the Industrial Park,
Limited Industrial, Institutional, and Industrial-Flex Zones and Making
a Determination of Exemption Pursuant to the California
Environmental Quality Act in Connection Therewith
CORRESPONDENCE RECEIVED
Subsequent to the publication of the agenda, the following correspondence was received.
Attachment 1: Letter from Prologis dated July 11, 2025 (Request for Continued Support
of the Prologis Drifter BESS Project and Industrial Development)
Attachment 2: Letter from Prologis dated July 11, 2025 (Clarification and Correction to
Indicative Property Tax Estimate for Prologis Drifter BESS Project)
Attachment 3: Graphical Information from Prologis on City Benefits with and without
Battery Energy Storage Systems (BESS)
Item: 8.A.
SUPPLEMENTAL
1
Pier 1, Bay 1, San Francisco, California 94111 United States Main +1 303.567.5000 Fax +1 303.567.5903 www.prologis.com
July 11, 2025
Jacob Morgan
VP of Development, Energy Storage
Pier 1, Bay 1
San Francisco, CA 94111
Moorpark City Council
City Manager, PJ Gagajena
City Attorney, Kevin Ennis
799 Moorpark Avenue
Moorpark, CA 93021
Subject: Request for Continued Support of the Prologis Drifter BESS Project and
Industrial Development
We write to express our strong concern regarding the City of Moorpark’s recent decision to
revoke the conditional use of industrial-zoned land for Battery Energy Storage Systems (BESS).
This decision, as currently contemplated, places the future of the Prologis Drifter BESS and
industrial development at significant risk, despite our substantial investment and compliance
with all city requirements to date.
We respectfully request that the City reconsider this revocation, or at minimum, allow the
Prologis Drifter BESS project to proceed under the previously established conditional use
guidelines. This project represents a rare opportunity for Moorpark to host a next-generation,
advanced-safety energy storage facility paired with 510k square feet of industrial development—
bringing significant environmental, financial, and community benefits.
In May 2023, the City of Moorpark approved energy storage as a conditional use on industrially
zoned land, provided systems were housed within buildings. In alignment with this policy, we
submitted a pre-application in late 2023 incorporating a fully enclosed BESS design, and we
purchased the property for $48 million in December 2023 with the intent to proceed under those
terms.
There is not a more ideal location for a BESS facility in Moorpark. It is directly adjacent to the
Moorpark substation, it is set back from Los Angeles Avenue to limit visibility, and nestled
under the railroad tracks to create a buffer between the planned industrial development.
We began development work in earnest in the summer of 2023, confident in the City’s land use
framework. The City’s proposed reversal in May 2025, absent a grandfathering provision, places
our project and investment at substantial risk.
We would like to address three main points to advocate for the energy storage use case in
Moorpark.
ATTACHMENT 1
2
Pier 1, Bay 1, San Francisco, California 94111 United States Main +1 303.567.5000 Fax +1 303.567.5903 www.prologis.com
1. Safety – Advancements in Energy Storage Technology
The BESS industry has evolved rapidly in recent years. The concerns stemming from earlier
BESS incidents at Moss Landing and Otay Mesa are valid but dated. Those facilities utilized
Nickel Manganese Cobalt (NMC) chemistry, which is no longer industry standard due to its
chemical instability. Furthermore, today’s energy storage systems are governed by rigorous
national safety standards, including UL 9540, which certifies system-level fire and electrical
safety, and NFPA 855, which establishes comprehensive installation and emergency response
criteria. The Drifter project will be fully compliant with these codes, ensuring that the facility
meets or exceeds the most current and robust safety requirements in the industry.
The Drifter project will utilize Lithium Iron Phosphate (LFP) chemistry, which is a significantly
safer atomic compound. In the rare event of thermal runaway, the reaction remains confined
within a single module and typically self-extinguishes within 2-4 hours. Air quality assessments
from fires induced in a lab confirm that emissions from LFP batteries in open-air settings do not
reach levels hazardous to human health.
Modern containerized BESS installations incorporate multiple layers of protection, including
liquid cooling, ventilation systems, sensors for early anomaly detection, and the ability to
electrically isolate individual modules. These safeguards are complemented by an Emergency
Response Plan developed in coordination with the local fire department, which includes annual
on-site training to ensure familiarity with system functionality and emergency protocols.
2. Significant Economic and Community Benefits for Moorpark
The Drifter BESS project includes a 500 MW energy storage facility and a 510,000 square foot
industrial development, representing a combined investment of approximately $763 million.
Based on current forecasts and standard tax assumptions, the battery component alone is
expected to generate approximately $66 million in property tax revenue over 20 years, including
an estimated $6 million for the City and over $22 million for the Moorpark Unified School
District. These estimates are indicative only and may vary based on future project scope,
valuation methods, or tax policies. The project is also projected to contribute $20 million in sales
taxes, with approximately $2.8 million benefiting the City—again, based on current estimates.
The BESS project is expected to create up to 200 construction jobs and several full-time
operational roles. The industrial component adds another approximately 500 construction jobs
and 340 full-time positions, but its viability is tied to the BESS facility, which serves as the
anchor.
By contrast, using the site solely for industrial use would yield a much smaller facility (120,000
sq ft) and an estimated investment of just $42 million, providing more than 2.5 times less
economic impact.
3
Pier 1, Bay 1, San Francisco, California 94111 United States Main +1 303.567.5000 Fax +1 303.567.5903 www.prologis.com
In addition, the project will deliver key infrastructure improvements, including the widening of
Los Angeles Avenue, drainage upgrades, and culvert expansion—enhancing traffic flow and
removing the parcel from the 100-year floodplain.
3. Alternative Regulatory Path & State Authority Under AB 205
Should local entitlements be withdrawn, there is no other permitting pathway besides state-level
approval through the California Energy Commission (CEC) under Assembly Bill 205 which
overrides local permitting. The local permitting authority would lose approval and decision-
making rights in the design of the project. The CEC’s recent approval of the 1,150 MW Darden
project in Sacramento under this framework illustrates the state's support for high-impact energy
projects.
Our preference would be to collaborate with the City of Moorpark, and we believe the local
permitting path remains the most constructive and offers the most benefits to the community.
However, we must consider all available options to advance a project with this level of
investment and a contractual obligation to deliver capacity.
The Drifter BESS project is a unique opportunity for Moorpark to lead in grid innovation,
economic development, and retain control over land use. We respectfully request the City to
uphold its original policy, or at the very least, allow our project to proceed under the original
conditional use framework.
We remain committed to working with the City in a spirit of partnership and are available to
meet to address any questions.
Sincerely,
Jacob Morgan
VP of Development, Energy Storage
Prologis
4
Pier 1, Bay 1, San Francisco, California 94111 United States Main +1 303.567.5000 Fax +1 303.567.5903 www.prologis.com
July 11, 2025
Jacob Morgan
VP of Development, Energy Storage
Pier 1, Bay 1
San Francisco, CA 94111
Moorpark City Council
City Manager, PJ Gagajena
City Attorney, Kevin Ennis
799 Moorpark Avenue
Moorpark, CA 93021
Subject: Clarification and Correction to Indicative Property Tax Estimate for Prologis
Drifter BESS Project
We are writing to provide a clarification regarding the indicative property tax estimates
previously shared with the City of Moorpark in connection with our Battery Energy Storage
System (BESS) project.
In our earlier presentation to Councilmembers, we estimated that the project would generate
approximately $92 million in property tax revenue over 20 years. This figure was developed
using a real estate tax methodology that applied a 3% annual escalation to the projected
improvements value, followed by a 1.06% tax rate applied over a 20-year period. At the time,
this reflected our best internal understanding of property tax calculations.
Prior to providing a more detailed financial analysis to Councilmember Castro, we engaged a
specialized tax advisor to validate our assumptions. The tax consultant recommended a personal
property tax methodology as more appropriate for the BESS project, due to the nature of the
assets involved.
Under this revised and more appropriate methodology:
•The full value of the BESS improvements is depreciated annually over a 10-year
schedule, reflecting their useful life.
•System augmentations in Years 5 and 11 account for the replacement of degraded battery
components and result in additional taxable value.
•The land value is escalated at 2% annually, consistent with the limits set by Proposition
13 on real property appreciation.
•A 1.06% tax rate is applied to the depreciated personal property and escalated land values
annually.
Using this revised approach, our current estimate of the total indicative property tax revenue over
20 years is approximately $66 million.
ATTACHMENT 2
5
Pier 1, Bay 1, San Francisco, California 94111 United States Main +1 303.567.5000 Fax +1 303.567.5903 www.prologis.com
Importantly, this figure—and all component allocations—should be understood as non-binding,
forward-looking estimates based on current project cost forecasts and standard tax assumptions.
Actual tax obligations may differ due to future changes in project scope, valuation practices, or
applicable tax laws.
Within that estimated total:
• Approximately $6.03 million (9.08%) may be allocated to the City of Moorpark.
• Approximately $22.25 million (33.49%) may be allocated to the Moorpark Unified
School District.
We sincerely apologize for any confusion caused by the earlier estimate. Our goal has always
been to provide accurate, good-faith projections, and we have since taken proactive steps to
verify our calculations using subject matter experts. These updated figures represent our best
current understanding, but are not intended to serve as commitments or guarantees.
We remain committed to transparency, accuracy, and partnership with the City of Moorpark and
its community stakeholders. Please do not hesitate to reach out should you have any questions or
wish to review the updated financial analysis in detail.
Sincerely,
Jacob Morgan
VP of Development, Energy Storage
Prologis
6
City Benefits with and without BESS
Current Site Plan –with BESS
•500 MW Drifter BESS
•(3) Industrial Buildings totaling 510k SF
Alternative Site Plan –without BESS
•(4) Industrial Buildings totaling 630k SF
•(1) 65k SF trailer parking yard
BESS
INDIND IND
Parcel
$763m Total Expected Investment $152m
$653m BESS $0
$110m Industrial $152m
$8.6m Total Property Taxes to City of Moorpark (9.08%) over 20 years $3.5m
$40.3m Property Taxes to City of Moorpark + Moorpark Unified School District over
20 years (9.08%+ 33.49%)
$16.7m
$3.9m Total Sales Tax to City of Moorpark $1.5m
INDIND IND
IND
LOS ANGELES AVE LOS ANGELES AVE
Amounts shown are indicative based on today's equipment pricing and EPC quotes.
ATTACHMENT 3
7
Property Tax to City of Moorpark & Unified School District from BESS
Amounts shown are indicative based on today's equipment pricing and EPC quotes.
8
Sales Tax to City of Moorpark from BESS
Drifter BESS Project Costs
Equipment & EPC
BESS Equipment Batteries $232,000,000
BESS Tariff $104,400,000
EPC $220,400,000
Interconnection
Project Collector Substation $23,500,000
Gen-Tie to POI $6,000,000
Interconnection Facility Network Upgrades $28,057,037
Finance
County Sales Tax Rate 7.25%
Sales Tax $20,015,800
Contingency $17,980,000
Total
Total Expected Investment $653,151,787
Total Sales Tax 7.25% $20,015,800
State of CA 6.00% $16,564,800
City of Moorpark 1.00% $2,760,800
County of Ventura 0.25% $690,200
Amounts shown are indicative based on today's equipment pricing and EPC quotes.
Assumed sales tax on 100% of BESS, 25% of EPC contract
9
Total Taxes to City of Moorpark from Industrial
Current Site Plan - Industrial
510,000.00 Square Feet
110,000,000.00$ TEI
1,166,000.00$ Starting Annual Property Tax (1.06% on TEI)
Year 1 2 3 …Total over 20 years
Property Value (+2%/year)110,000,000$ 112,200,000$ 114,444,000$
Estimated Property Tax 1,166,000$ 1,189,320$ 1,213,106$ 28,330,733.19$ Property Tax over 20 years assuming 2% escalation
2,572,430.57$ Total tax to City of Moorpark (9.08%)
12,060,393.12$ Total tax to City of Moorpark + Moorpark Unified School Dist (9.08% + 33.49%)
Current Industrial Alt Industrial
Total Sales Tax 7.25% $7,975,000 $3,045,000
State of CA 6.00% $6,600,000 $2,520,000
City of Moorpark 1.00% $1,100,000 $420,000
County of Ventura 0.25% $275,000 $105,000
Amounts shown are indicative based on today's equipment pricing and EPC quotes.
Alt Site Plan - Industrial
120,000.00 Square Feet
42,000,000.00$ TEI
445,200.00$ Starting Annual Property Tax (1.06% on TEI)
Year 1 2 3 …Total over 20 years
Property Value (+2%/year)42,000,000$ 42,840,000$ 43,696,800$
Estimated Property Tax 445,200$ 454,104$ 463,186$ 10,817,189.03$ Property Tax over 20 years assuming 2% escalation
982,200.76$ Total tax to City of Moorpark (9.08%)
4,604,877.37$ Total tax to City of Moorpark + Moorpark Unified School Dist (9.08% + 33.49%)
Total Sales Tax was calculated as 7.25% of TEI 10
Drifter BESS Project Costs Notes
Equipment & EPC
BESS Equipment Batteries $232,000,000 Sungrow Powertitan 2.0/3.0 technology. Assumed delivery Q1 2028
BESS Tariff $104,400,000 45% tariff scenario
EPC $220,400,000 EPC = "Engineering, Procurement, & Construction"
Interconnection
Project Collector Substation $23,500,000 230kV project substation allowance. Includes 2 230kV MPTs
Gen-Tie to POI $6,000,000 1.5 miles of OH 230kV
Interconnection Facility Network Upgrades $28,057,037 Latest estimate of interconnection costs based on draft LGIA from 6/27
Finance
County Sales Tax Rate 7.25%From Moorpark website
Sales Tax $20,015,800 Assumed sales tax on 100% of BESS, 25% of EPC contract
Contingency $17,980,000 2% battery contingency allowance, 5% EPC contingency allowance, 1% spare parts allowance
Total
Total Expected Investment $653,151,787
Drifter BESS Project Budget
Amounts shown are indicative based on today's equipment pricing and EPC quotes.
11