HomeMy WebLinkAboutAGENDA REPORT 1990 0813 CC ADJ ITEM 07FF. Project Location
The proposed project contains 497 acres and is bounded to the north by
Los Angeles Avenue, to the south by Tierra Rejada Road, to the east by
the Moorpark Freeway and to the west by Spring Road.
G. General Plan/Zoning/Existing Land Use:
The Land Use Map of the City of Moorpark General Plan designates the
site as SP (Specific Plan). No General Plan amendment is required. When
adopted, the Development Standards in the Specific Plan will have the legal
effect of zoning on the property. The site is presently vacant.
H. Project History
For several years, plans for the project site have been prepared and
considered in various stages of review by the city.
In 1985, the city amended the General Plan designation for this property
from "Low Density" residential to "Specific Plan" to provide the opportunity
to ensure a comprehensive and cohesive plan for the entire property.
In 1989, the city initiated the preparation of a Specific Plan, Environmental
Impact Report, and Fiscal Impact Report.
The proposed reviewed several land use alternatives for the property and
after considerable review, decided on the land use scenario which is
presented in the current Specific Plan.
The City Council's land use plan for the site includes zoning designations,
acreages and densities for the entire 497-acre site.
2
3
I.Planning Commission Action
The City of Moorpark Planning Commission has held 2 public hearings on
this project on July 2 and July 16, 1990. Several members of the public
provided public testimony (see attachments 1, 2 and 3). A complete record
of the testimony given may be found in the public record.
As a result of public testimony and issues identified by the Planning
Commission, the Commission recommended certification of the Carlsberg
EIR and adoption of the Carlsberg Specific Plan with the following
modifications:
1. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT PLANNING AREA 1 BE CHANGED FROM 1
DWELLING UNIT PER ACRE TO 1 DWELLING UNIT PER 2
ACRES.
2. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT PLANNING AREA 2 BE CHANGED FROM SF
9,000 TO 1 DWELLING UNIT PER 2 ACRES.
3. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT PLANNING AREA 3 BE SHOWN AS THE
FUTURE MIDDLE SCHOOL SITE.
4. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT THE DENSITY OF PLANNING AREA 5 BE
INCREASED (MULTI-FAMILY SITE) IF NEEDED TO OFF-
SET LOSS OF UNITS IN PLANNING AREAS 1 AND 2.
3
5. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT THE MULTI-FAMILY AREA SHOULD
PROVIDE AFFORDABLE HOUSING OPPORTUNITIES.
6. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT A PORTION OF PLANNING AREA 12 (OPEN
SPACE) IN THE VICINITY OF P.A. 3 BE DEVELOPED WITH
SOME 9,000 SF LOTS.
7. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT MODIFICATIONS TO PLANNING AREAS,
WHICH RESULT IN INCREASED ACREAGE AND FEWER
DWELLING UNITS (AS THEY RELATE TO THE NORTH AND
SOUTH HALVES) NOT BE A CONSIDERATION BY THE CITY
IN ITS ULTIMATE DECISION ON THE PROJECT.
8. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT THE DEVELOPER NOT BE REQUIRED TO
PROVIDE THE EXTREME HEAVILY LANDSCAPED AREAS
IDENTIFIED AS THE "GATEWAY", BUT TO CONSIDER
HEAVY LANDSCAPING WITHIN THE SPECIFIC PLAN AREA.
9. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT ALL RESIDENTIAL DEVELOPMENT ALONG
SPRING ROAD BE SET BACK (EASTWARD) BEHIND THE
HILLS, THEREBY BUFFERING THE VIEW OF THE ADJA-
CENT RESIDENTS AND THIS WOULD PROVIDE MORE OPEN
SPACE AREA ALONG SPRING ROAD.
10. THE PLANNING COMMISSION RECOMMENDS TO THE CITY
COUNCIL THAT DROUGHT TOLERANT PLANTS BE PRO-
VIDED WITHIN THE OVERALL LANDSCAPE PLAN AND
ALONG GREENBELT AREAS AT SPRING AND TIERRA
4
REJADA ROADS.
SECTION II: PROJECT SUMMARY
A. Project Description
The design concept for the Carlsberg Specific Plan Area is depicted in the
Land Use Plan (see following page), and was formulated by the Moorpark
City Council with respect for the natural physical character of the site. The
preservation of valleys, hillsides and meandering drainage courses has played
an important role in the ultimate land use plan presented herein. Develop-
ment areas will blend sensitively with the natural environment.
Consistent with the goals of the adopted Moorpark General Plan, the land
use plan for the Carlsberg property has been prepared to achieve a
balanced community" offering a complementary mix of residential, shopping,
employment-generating,recreational and open space uses. The Specific Plan
Area includes 552 residential units, 17.4 acres of business park uses, 42.6
acres of office/commercial uses, four acres to be dedicated to the city, and
240.7 acres of open space and park uses. (See Statistical Summary.)
The project has also been designed to act as a gateway to the city and to
achieve compatibility with the surrounding properties. A definite, distinct
image will be established through the treatment of natural open space, the
placement of residential units and attention to overall landscape treatment.
These unifying elements will enhance interest through the variety of terrain,
views and an extensive open space system.
5
STATISTICAL SUMMARY
ELLNG
LAND USE ACRES
D
UNITS
SF-1 74GL E PALLY ss o
f 1i L a1
1
ACRE uRR PEn cross Aaw 55
1 Rl. Fl ! tiBP. Y k I SF- SINGLE FAMILY7
l ' s. a .
i SF 1 9000 2.2 MATS PER GROSS ACRE
84.1 141
SR/C s
4. f -i ACRE
w , ,pi r.: .tom SF- 1 SINGLE FAMILY3 -
r -
i II Os 5000 ll 3.0 oars PER GROSS ACRE 43.1 167
r .. . i,'
I \ m MUM-FANNY 128 16s
s-
ff. '1 i ' , "
1. BP I BUSIgSSPAf9( 17.4
N C J i SR/C COMMERCIAL 30.0
h+ tom '/ _ / A ` •
y
l
c.` SF-P ram % N/C RETAL/COMNERCIAL 128ifY. J s,'
I '•
1.,
jt `( I ocu I DEDICATED CITY USE 4.0
7r 9vVvVvV
i.11 `-. PARK 272
c
t/
I t l
OS OPEN SPACE 213 5
SUBTOTAL 479.5
yy PRIMARY ROADS 17.51.
TOTAL 497.0 552
ibi,
LAND Ce PLA
CARLSBERG EUR
PITV fF MAAflPARIC
B. STATISTICAL SUMMARY
Dwelling Units/
Category Acres Units Acre
Single Family-1 acre 55 55 1 DU/acre
Single Family-9000 64.1 141 2.2 DU/acre
Single Family-5000 43.1 167 3.8 DU/acre
Multi Family 12.6 189 15 DU/acre
Business Park 17.4
Subregional Retail/
Commercial 30.0
Neighborhood Retail/
Commercial 12.6
Dedicated City Use 4.0
Park 27.2
Open Space 213.5
Primary Roads 1
TOTAL 497.0 552
7
SECTION III: CONFORMANCE WITH THE GENERAL PLAN
The Carlsberg Specific Plan implements each of the elements of the City of Moorpark
General Plan. As such, the plan is supportive of and consistent with its goals and
policies. See pages 77-95 of the Carlsberg Specific Plan and attachement 4 herein for
a detailed analysis.
SECTION IV: ANALYSIS
Throughout the lengthy review process by both staff and decision makers, several issues
and areas of concern were identified. These issues formed the basis for the project
description currently before the Council. On February 21, 1990, the City Council
directed Carlsberg to proceed with a specific plan based on the Land Use Plan contained
therein.
A summary of the issues addressed in the specific plan and accompanying DEIR follows.
A. Land Use
The following is a summary of the components of the land use plan.
1. Residential
Within the Carlsberg Specific Plan Area, a mix of residential product
types will be provided ranging from one-acre single-family residential lots
to attached multiple family products at a density of 15.0 dwelling units
per acre. Four residential density classifications are included in the plan.
For purposes of density calculations, the following density ceilings apply:
8
Dwelling Units Percent of Total
Single family-1 acre 55 10
Single family-9000 141 25
Single family-5000 167 30
Multi family 189
552 100
2. Commercial Uses
a. Business Park
A total of 17.4 acres is allocated to Business Park. Proposed uses
will include research and development, office parks and single user
sites, light industry manufacturing and support services. A limited
amount of retail and service commercial will be permitted to support
the immediate needs of Business Park users.
b. Sub-Regional Retail Commercial
This site, at the corner of New Los Angeles Avenue and the
Moorpark Freeway, contains 30 acres. Its use is intended as a
shopping center,perhaps with one large anchor, to meet the shopping
needs of the local community. Support retail and service uses will
be encouraged.
c. Neighborhood Retail Commercial
This 12.6-acre parcel located just west of the subregional retail
commercial site is intended to provide retail and service opportunities
of a more "neighborhood" nature. In addition, small offices will be
permitted.
9
0
3. Dedicated City Use
The land use plan designates four acres at the intersection of Spring
Road and the river bridge as a "Dedicated City Use."
Although not determined at this time, the purpose of this site will be
to serve some public objective. Possible uses on the site include a city
or county public service use, which might include a library, fire station,
senior center or affordable housing. Development standards will be
dependent upon the city's ultimate decision for use of this property.
4. Open Space/Recreation
The Open Space and Recreation Plan for this property provides for the
protection of views and the preservation of natural features and habitat
areas and the provision of recreation areas. A total of 240.7 acres or
48 percent of the site is classified as "Open Space" and "Park."
The open space area meanders through the site and will be retained in
its natural condition.
A 27.2-acre park site is proposed in the central portion of the project.
The park site will be dedicated in fee to the City of Moorpark.
Although the city has no plans for the park at this time, improvements
to the park will likely provide for passive and active recreation.
Possible improvements envisioned for the park at this time are ball
fields, picnic areas and trails. These improvements will be planned and
implemented as city funds become available.
5. Circulation
10
The Circulation Plan for the Carlsberg Project Area establishes the
roadway network and basic standards for safe vehicular movement within
the area.
a. Regional Access
Regional access to the site is provided by way of two state highway
corridors: the Simi Valley Freeway (State Route 118) and the
Moorpark Freeway (State Route 23).
State Route 118, which terminates in the northeast section of the city
provides access to the City of Simi Valley and the San Fernando
Valley to the east. Route 118 continues through the City of
Moorpark as a conventional roadway, eventually terminating at the
Santa Paula Freeway (SR-126) in the City of Ventura to the west.
State Route 23 enters at the southeast portion of the city and
terminates at the New Los Angeles Avenue interchange. Route 23
provides access to the Ventura Freeway (U.S. 101) eight miles south
of the city.
b. Local Access
Local access is obtained by four existing roadways as follows:
New Los Angeles Avenue - classified as a primary highway, six
lanes, 118-foot right-of-way with median
Spring Street - classified as a secondary highway, four lanes, 94-
foot right-of-way with median
Tierra Rejada Road - classified as a secondary highway, four lanes,
94-foot right-of-way with median
11
Peach Hill Road - classifies as a local collector street of varying
widths.
Internal access on the project site will be designed as a function of
the site specific planning process. All roadways shall meet the
requirements of the City of Moorpark standards.
6. Grading
The Conceptual Grading Plan illustrates the extent of grading necessary
to achieve the design concept for Carlsberg. The earthwork required to
implement the project will be approximately 4,000,000 cubic yards. The
overall grading operation for the project will balance onsite.
The Conceptual Grading Plan reflects the sensitivity to the develop-
ment/open space interface by preserving significant topographic features,
maintaining adequate setbacks and providing sensitive grading and
landscaping procedures near park boundaries and natural open space
features. The plan will conform with the intent and provisions of the
City of Moorpark grading standards.
7. Utilities and Services
a. Police. The Police Department has indicated that an additional 1.8
officers at a cost of $76,000 and one patrol vehicle at $17,000 will
be necessary to serve the development. The draft fiscal analysis
indicates that fees and general fund revenue will far exceed projected
project costs.
b. Fire. The Fire Department has indicated that fire protection needs
for the project can be met. As development occurs, the imposition
of developer fees and in-tract improvements will ensure compliance
with all fire hazard standards.
12
13
c. Schools. The Moorpark Unified School District will serve the
development based upon the imposition of developer fees. According
to the district, additional possible mitigation measures to be included
in the review process include reservation of a school site, the
inclusion of bus turnouts at appropriate locations, and cooperation
with the district in planning of construction traffic, noise and dust.
d. Water and Wastewater. The project site is located within Ventura
County Waterworks District No. 1, Division 1. The project is located
within a pressure zone which currently has no storage facilities. The
applicant will be required to install a storage tank currently proposed
in the eastern portion of the property. The applicant will work with
the district in the ultimate design of the system and shall provide the
system. The district is currently the Moorpark Wastewater Treatment
Plant. Assurances by the district that adequate capacity exists will
be required at the time of tentative tract map approval. In addition,
the applicant will be required to pay all applicable fees and comply
with all rules and regulations of the district.
13
8. Landscape and Architectural Design Guidelines
The design concepts and guidelines for Carlsberg provide overall
guidance for the expression of development for the community. The
purpose of these design guidelines is threefold:
To provide the City of Moorpark with the necessary assurances that
this community will develop in accordance with the quality and
character proposed herein;
To provide guidance to developers, builders, engineers, architects,
landscape architects and other design professionals in order to
maintain design continuity during the period of development; and,
To provide guidance to the City Staff, City Planning Commission and
the City Council in the review of future development phases.
9. Environmental Impact Analysis
Draft EIR No. 299 addresses the impacts associated with the
development.
This EIR addresses the environmental concerns identified during the
Initial Study and Notice of Preparation process. Potential impacts to the
environment including project-related and cumulative impacts resulting
from implementation of the project are as follows: land use com-
patibility; transportation and circulation impacts upon the surrounding
circulation system; local/regional air quality impacts; impacts upon
geology and soils; impacts on biological resources; potential effects upon
public services and utilities; socio-economic impacts; impacts on
hydrology/drainage; acoustical impacts; and, aesthetics.
14
5
Positive impacts and those impacts which can be mitigated to a level of
insignificance with the incorporation of the recommended mitigation
measures include the following:
a. Hydrology and drainage
b. Increased erosion and seismic exposure
c. Biological resources
d. Cultural resources
e. Local circulation networks
f. Short and long-term air quality emissions
g. Acoustics
h. Landform modification/aesthetics
i. Socioeconomics
j. Public services/utilities
k. Open space/parks
Those impacts which are not fully mitigated to a level of insignificance
even though mitigation measures have been incorporated into the
project, include:
a. Cumulative traffic impacts at the Spring Road/Los Angeles Street
intersection if SR-118 is not extended.
b. Some exceedance of state and federal cumulative air quality
emissions on a daily basis with or without the project.
A complete summary of the impact and mitigation measures is included
in the draft EIR.
15 •
16
SECTION V: RECOMMENDED CITY COUNCIL ACTIONS
A. Requested Actions:
This hearing is intended to provide an overall presentation of the project
to the City Council. In addition, it is meant to continue the open public
forum for comments on the EIR.
It is recommended that the. Council proceed as follows:
1) That the City Council determine the adequacy of the Environmental
Impact Report;
2) That the City Council consider the recommendations of the Planning
Commission;
3) That the City Council open the public hearing and receive testimony
from the applicant and the public;
4) That the City Council continue the public hearing to the Council's
regular meeting of August 15, 1990.
5) That the City Council direct staff to prepare any proposed conditions
and findings for approval; and/or
6) That the Council direct staff as deemed appropriate.
16
17
PLANNING COMMISSION
STAFF REPORT
DULY 2, 1990
STAFF REPORT
CARLSBERG SPECaTC PLAN
CARLSBERG ENVIRONMENTAL IMPACT REPORT
SECTION I: GENERAL INFORMATION
A. Hearing Date: July 2, 1990
B. Hearing Time: 7 p.m.
C. Hearing Location:
City Council Chambers, City Hall
799 Moorpark Avenue
Moorpark, California
D. Staff Contacts: Pat Richards, Director, Community Development
Department
Paul Porter, Senior Planner
E. Applicant: Carlsberg Financial, Inc.
2800 28th St., Suite 200
Santa Monica, California 90405
VICINITY MAP
sue.w,
imago
s
1
F. Project Location
The proposed project contains 497 acres and is bounded to the north by
Los Angeles Avenue, to the south by Tierra Rejada Road, to the east by
the Moorpark Freeway and to the west by Spring Road.
G. General Plan/Zoning/Existing Land Use:
The Land Use Map of the City of Moorpark General Plan designates the
site as SP (Specific Plan). No General Plan amendment is required. When
adopted, the Development Standards in the Specific Plan will have the legal
effect of zoning on the property. The site is presently vacant.
H. Project History
For several years, plans for the project site have been prepared and
considered in various stages of review by the city.
In 1985, the city amended the General Plan designation for this property
from "Low Density" residential to "Specific Plan" to provide the opportunity
to ensure a comprehensive and cohesive plan for the entire property.
In 1989, the city initiated the preparation of a Specific Plan, Environmental
Impact Report, and Fiscal Impact Report.
The City Council reviewed several land use alternatives for the property
and after considerable review, decided on the land use scenario which is
presented in the Specific Plan.
The City Council's land use plan for the site includes zoning designations,
acreages and densities for the entire 497-acre site.
2
0:7C)
SECTION II: RECOMMENDED PLANNING COMMISSION ACTIONS
A. Requested Actions:
This hearing is intended to provide an overall presentation of the project
to the Commission. In addition, it is meant to open the public forum for
comments on the EIR.
It is expected that public testimony will take place and that the public
hearing will be continued to July 16, 1990 for final action. At the July 16,
1990 hearing, proposed conditions and findings for a recommendation of
approval will be provided.
SECTION III: PROJECT SUMMARY
A. Project Description
The design concept for the Carlsberg Specific Plan Area is depicted in the
Land Use Plan (see following page), and was formulated by the Moorpark
City Council with respect for the natural physical character of the site. The
preservation of valleys, hillsides and meandering drainage courses has played
an important role in the ultimate land use plan presented herein. Develop-
ment areas will blend sensitively with the natural environment.
Consistent with the goals of the adopted Moorpark General Plan, the land
use plan for the Carlsberg property has been prepared to achievg a
balanced community"offering a complementary mix of residential, shopping,
employment-generating,recreational and open space uses. The Specific Plan
Area includes 552 residential units, 17.4 acres of business park uses, 42.6
acres of office/commercial uses, four acres to be dedicated to the city, and
240.7 acres of open space and park uses. (See Statistical Summary.)
3
241
The project has also been designed to act as a gateway to the city and to
achieve compatibility with the surrounding properties. A definite, distinct
image will be established through the treatment of natural open space, the
placement of residential units and attention to overall landscape treatment.
These unifying elements will enhance interest through the variety of terrain,
views and an extensive open space system.
LAND USE PLAN
I -os I
STATISTICAL SUMMARY
urouc joss wrzMUM
F
rsa w W .
i
Y IiwdYl 701;
WI .PA 5.
PAS 6
o...m ..
PA
I SF S . I. `i PA33 4' a s OWMK 40
4 SF-9000
P na
1f 1,..
6 . _ .. .......--).,
A?
e`
r
qcw, - _ PA to , II YrAOLL MS
MOW ZOOS n,
CCU
t :"'n...Ma
V
V
4
B. STATISTICAL SUMMARY
Dwelling Units/
Category Acres Units Acre
Single Family-1 acre 55 55 1 DU/acre
Single Family-9000 64.1 141 2.2 DU/acre
Single Family-5000 43.1 167 3.8 DU/acre
Multi Family 12.6 189 15 DU/acre
Business Park 17.4
Subregional Retail/
Commercial 30.0
Neighborhood Retail/
Commercial 12.6
Dedicated City Use 4.0
Park 27.2
Open Space 213.5
Primary Roads 17 5
TOTAL 497.0 552
5
SECTION IV: CONFORMANCE WITH THE GENERAL PLAN
The Carlsberg Specific Plan implements each of the elements of the City of Moorpark
General Plan. As such, the plan is supportive of and consistent with its goals and
policies. See pages 77-95 of the Carlsberg Specific Plan for a detailed analysis.
SECTION V: ANALYSIS
Throughout the lengthy review process by both staff and decision makers, several issues
and areas of concern were identified. These issues formed the basis for the project
description currently before your Commission. On February 21, 1990, the City Council
directed Carlsberg to proceed with a specific plan based on the Land Use Plan contained
therein.
A summary of the issues addressed in the specific plan and accompanying DEIR follows.
A. Land Use
The following is a summary of the components of the land use plan.
1. Residential
Within .the Carlsberg Specific Plan Area, a mix of residential product
types will be provided ranging from one-acre single-family residential lots
to attached multiple family products at a density of 15.0 dwelling units
per acre. Four residential density classifications are included in the plan.
For purposes of density calculations, the following density ceilings apply:
91
Dwelling Units Percent of Total
Single family-1 acre 55 10
Single family-9000 141 25
Single family-5000 167 30
Multi family
552 100
2. Commercial Uses
a. Business Park
A total of 17.4 acres is allocated to Business Park. Proposed uses
will include research and development, office parks and single user
sites, light industry manufacturing and support services. A limited
amount of retail and service commercial will be permitted to support
the immediate needs of Business Park users.
b. Sub-Regional Retail Commercial
This site, at the corner of New Los Angeles Avenue and the
Moorpark Freeway, contains 30 acres. Its use is intended as a
shopping center,perhaps with one large anchor, to meet the shopping
needs of the local community. Support retail and service uses will
be encouraged.
c. Neighborhood Retail Commercial
This 12.6-acre. parcel located just west of the subregional retail
commercial site is intended to provide retail and service opportunities
of a more "neighborhood" nature. In addition, small offices will be
permitted.
7
0
3. Dedicated City Use
The land use plan designates four acres at the intersection of Spring
Road and the river bridge as a 'Dedicated City Use."
Although not determined at this time, the purpose of this site will be
to serve some public objective. Possible uses on the site include a city
or county public service use, which might include a library, fire station,
senior center or affordable housing. Development standards will be
dependent upon the city's ultimate decision for use of this property.
4. Open Space/Recreation
The Open Space and Recreation Plan for this property provides for the
protection of views and the preservation of natural features and habitat
areas and the provision of recreation areas. A total of 240.7 acres or
48 percent of the site is classified as "Open Space" and "Park."
The open space area meanders through the site and will be retained in
its natural condition.
A 27.2-acre park site is proposed in the central portion of the project.
The park site will be dedicated in fee to• the City of Moorpark.
Although the city has no plans for the park at this time, improvements
to the park will likely provide for passive and active recreation.
Possible improvements envisioned for the park at this time are ball
fields, picnic areas and trails. These improvements will be planned and
implemented as city funds become available.
8
5. Circulation
The Circulation Plan for the Carlsberg Project Area establishes the
roadway network and basic standards for safe vehicular movement within
the area.
a. Regional Access
Regional access to the site is provided by way of two state highway
corridors: the Simi Valley Freeway (State Route 118). and the
Moorpark Freeway (State Route 23).
State Route 118, which terminates in the northeast section of the city
provides access to the City of Simi Valley and the San Fernando
Valley to the east. Route 118 continues through the City of
Moorpark as a conventional roadway, eventually terminating at the
Santa Paula Freeway (SR-126) in the City of Ventura to the west.
State Route 23 enters at the southeast portion of the city and
terminates at the New Los Angeles Avenue interchange. Route 23
provides access to the Ventura Freeway (U.S. 101) eight miles south
of the city.
b. Local Access
Local access is obtained by four existing roadways as follows:
e
New Los Angeles Avenue - classified as a primary highway, six
lanes, 118-foot right-of-way with median
Spring Street - classified as a secondary highway, four lanes, 94-
foot right-of-way with median
a'
Tierra Rejada Road - classified as a secondary highway, four lanes,
94-foot right-of-way with median
Peach Hill Road - classifies as a local collector street of varying
widths.
Internal access on the project site will be designed as a function of
the site specific planning process. All roadways shall meet the
requirements of the City of Moorpark standards.
6. Grading
The Conceptual Grading Plan illustrates the extent of grading necessary
to achieve the design concept for Carlsberg. The earthwork required to
implement the project will be approximately 4,000,000 cubic yards. The •
overall grading operation for the project will balance onsite.
The Conceptual Grading Plan reflects the sensitivity to the develop-
ment/open space interface by preserving significant topographic features,
maintaining adequate setbacks and providing sensitive grading and
landscaping procedures near park boundaries and natural open space
features. The plan will conform with the intent and provisions of the
City of Moorpark grading standards.
7. Utilities and Services
a. Police. The Police Department has indicated that an additional 1.8
officers at a cost of $76,000 and one patrol vehicle at $17,000 will
be necessary to serve the development. The draft fiscal analysis
10
g
indicates that fees and general fund revenue will far exceed projected
project costs.
b. Fire. The Fire Department has indicated that fire protection needs
for the project can be met. As development occurs, the imposition
of developer fees and in-tract improvements will ensure compliance
with all fire hazard standards.
c. Schools. The Moorpark Unified School District will serve the
development based upon the imposition of developer fees. According
to the district, additional possible mitigation measures to be included
in the review process include reservation of a. school site, the
inclusion of bus turnouts at appropriate locations, and cooperation
with the district in planning of construction traffic, noise and dust.
d. Water and Wastewater. The project site is located within Ventura '
County Waterworks District No. 1, Division 1. The project is located
within a pressure zone which currently has no storage facilities. The
applicant will be required to install a storage tank currently proposed
in the eastern portion of the property. The applicant will work with
the district in the ultimate design of the system and shall provide the
system. The district is currently the Moorpark Wastewater Treatment
Plant. Assurances by the district that adequate capacity exists will
be required at the time of tentative tract map approval. In addition,
the applicant will be required to pay all applicable fees and comply
with all rules and regulations of the district.
11
8. Landscape and Architectural Design Guidelines
The design concepts and guidelines for Carlsberg provide overall
guidance for the expression of development for the community. The
purpose of these design guidelines is threefold:
To provide the City of Moorpark with the necessary assurances that
this community will develop in accordance with the quality and
character proposed herein;
To provide guidance to developers, builders, engineers, architects,
landscape architects and other design professionals in order to
maintain design continuity during the period of development; and,
To provide guidance to the City Staff, City Planning Commission and
the City Council in the review of future development phases.
9. Environmental Impact Analysis
Draft EIR No. 299 addresses the impacts associated with the
development.
This EIR addresses the environmental concerns identified during the
Initial Study and Notice of Preparation process. Potential impacts to the
environment including project-related and cumulative impacts resultipg
from implementation of the project are as follows: land use com-
patibility; transportation and circulation impacts upon the surrounding
circulation system; local/regional air quialityimpacts; impacts upon
geology and soils; impacts on biological resources; potential effects upon
3 D
public services and utilities; socio-economic impacts; impacts on
hydrology/drainage; acoustical impacts; and, aesthetics.
Positive impacts and those impacts which can be mitigated to a level of
insignificance with the incorporation of the recommended mitigation
measures include the following:
a. Hydrology and drainage
b. Increased erosion and seismic exposure
c. Biological resources
d. Cultural resources
e. Local circulation networks
f. Shor and long-term air quality emissions
g. Acoustics
h. Landform modification/aesthetics
i. Socioeconomics
j. Public services/utilities
k. Open space/parks
Those imapcts which are not fully mitigated to a level of insignificance
even though mitigation measures have been incorporated into the
paroject, include:
a. Cumulative traffic impacts at the Spring Road/Los Angeles Street
intersection if SR-118 is not extended.
4
b. Some .exceedance of state and federal cumulative air quality
emissions on a daily basis with or without the project.
A complete summary of the impact and mitigation measures is included
in the draft EIR.
13
if
2
PLANNING COMMISSION
UPDATE MEMO
JULY 16, 1990
3
MEMORANDUM
DATE: July 10, 1990
TO: City of Moorpark Planning Commission
SUBJECT: Update on Status of Carlsberg Specific Plan
As you are aware, PBR has been working with the city staff and City Council over the
past year to develop the Carlsberg Specific Plan. The land use plan depicted in the
Specific Plan is a direct result of specific City Council direction in January 1990 with
regard to locations and intensities of uses.
On July 2, 1990, the Planning Commission opened the Public Hearing on the Carlsberg
Specific Plan and took public testimony. The public hearing was kept open and
continued to the regular meeting of the Planning Commission on July 16, 1990. The
applicant, Ron Tankersley, of Carlsberg Financial was present but did not offer testimony
at the hearing.
Thirteen members of the public spoke at the hearing. Their comments and concerns are
summarized as follows:
Preference for larger lots along Spring Street rather than SF-9000 lots.
The possibility of switching the 1-acre and the SF-9000 development areas was
suggested.
General concern for including eucalyptus trees in the landscape concept with
regard to water usage was noted.
Concern regarding the suitability of the use of palm trees was expressed.
Concern for project grading/dust impacts on students attending schools near the
site were noted.
Potential fire danger from natural slopes and the need for emergency evacuation
routes for potential fire/seismic events were expressed.
Concerns for loss of grassland and natural open space now onsite, and loss of
foraging habitat for birds were noted.
02 3
Several speakers expressed concern that views onsite from west of Spring Street
will be lost with development.
The Vice Chairman of the Commission expressed concerns for views from the
Moorpark freeway entering the site, views east across Spring Street from existing
residences and the possible desirability for larger lots onsite.
Recommendation:
As you are aware this matter is scheduled to go before the City Council on August 1,
1990 and August 15, 1990 for final action. In light of these hearing dates, final action
on the plan by the Planning Commission should occur today.
At the close of the public hearing it is the recommendation of staff that the Carlsberg
Specific Plan:
1) Be approved as submitted; or
2) Be approved as conditioned (conditions to be prepared based upon Commission
recommendations); or
3) Be" denied in part or in whole; and
4) To forward to the City Council comments on the draft environmental impact
report which the council should consider in its review of the final environmental
documentation.
3`41
SUMMARY OF
PUBLIC COMMENTS
31 .
MEMORANDUM
TO: City of Moorpark City Council
SUBJECT: Public Comments Received on Carlsberg Specific Plan/EIR
DATE: July 25, 1990 (City Council hearing of August 1, 1990)
The following is a summary of public comments received to date on the Carlsberg
Specific Plan/EIR:
Preference for larger lots along Spring Street rather than SF-9000 lots.
The possibility, of switching the 1-acre and the SF-9000 development areas was
suggested.
General concern for including eucalyptus trees in the landscape concept with
regard to water usage was noted.
Concern regarding the suitability of the use of palm trees was expressed.
Concern for project grading/dust/traffic impacts on students attending schools and
residents near the site were noted.
Potential fire danger from natural slopes and the need for emergency evacuation
routes for potential fire/seismic events were expressed.
Concerns for loss of grassland and natural open space now onsite, and loss of
foraging habitat for birds were noted.
Several speakers expressed concern that their views of the site east of Spring
Street will be lost with future development.
The Commission expressed concerns for views from the Moorpark freeway entering
the site, views east across Spring Street from existing residences and the possible
desirability for larger lots onsite.
A request to fix the bridge on Spring Road and improve Tierra Rejada Road prior
to construction was made.
36
Several comments were made encouraging no increase in densities of development.
A member of the School Board spoke in favor of designating Planning Area 3 as
a school site.
Concern about the "permanence" of the'open space area was noted.
Concern for water usage was expressed.
Support for access to freeway from Science Drive was expressed.
VI. CONFORMANCE WITH THE GENERAL PLAN
In 1985, the city amended the General Plan designation for this property to "Specific
Plan" to provide for the flexibility necessary to ensure a comprehensive plan compatible
with the city's goals and policies.
The Carlsberg Specific Plan implements each 'of the elements of the City of Moorpark
General Plan. As such, the specific plan is supportive of and consistent with the existing
goals and policies of the General Plan. The following is a discussion of the relationship
of this specific plan to each of the applicable General Plan Elements.
1. Land Use Element
The Land Use Element of the General Plan presents policies for the purpose of guiding
land use within the City of Moorpark. The following is a discussion of the compatibility
of the specific plan with applicable land use policies.
Urban Form
1.General Plan'Policy(ies)
Confine urban development in or adjacent to existing urban areas; maintain
open space between urban areas; integrate residential, commercial, and
industrial uses to achieve balanced communities; discourage outward
expansion of development when suitable developable areas exist within the
service areas.
Specific Plan Conformance
The project site is located adjacent to existing urban areas as well as
containing 240 acres of open space. Services are available to the site and
the land,use plan for the project has been prepared to achieve a "balanced
community,"with a complementary mix of residential shopping, employment-
1
3?
generating, recreational, and aesthetic uses.
2.General Plan Policy(ies)
To promote the integration of environmentally oriented and architecturally
sensitive design into the development of all facilities and types of land uses.
Specific Plan Conformance
The land use plan for the project was developed with detailed scrutiny by
city staff and decision makers. Large expanses of natural open space as
well as adherence to the architectural guidelines contained herein will
ensure the development of an aesthetically sensitive project.
3.General Plan Policy(ies)
A definite, distinct image shall be established through entry monumentation,
architecture, and landscape themes/trails.
To encourage the enhancement of community appearance in the urban
areas through beautification efforts and the preservation of aesthetic
resources.
Specific Plan Conformance
The specific plan has been formulated with respect for the natural physical
character of the site, and development will blend sensitively with the natural
environment. Approximately fifty percent of the site will remain in natural
open space and the Moorpark Freeway "gateway area" has been designed
to protect views of the natural environment.
2
CIO
Residential
4. General Plan Policy(ies)
Encourage a variety_ of housing densities and varying densities within
developments.
Specific Plan Conformance
A mix of housing types will .be provided ranging from one acre single-
family residential lots to attached multiple family dwelling units at a density
of 15.0 units per acre. Four residential density classifications are included
in the plan.
5.General Plan Policy(ies)
Establish a phasing plan which will prevent scattered urban development
and will provide for orderly growth.
Specific Plan Conformance
The specific plan. provides for the logical and sequential phasing of
development coordinated with the provision of adequate infrastructure
systems.
6.General Plan Policy(ies)
Designate mountainous areas as rural or open space.
Specific Plan Conformance
The steeper, more sensitive areas of the site have been designated as open
space in the City Council approved plan.
3
7.General Plan Policy(ies)
Encourage residential development with properly planned and adequate
public services.
Specific Plan Conformance
The specific plan provides for a system of public and communityy facilities
to meet the needs of residents of the project.
8.General Plan Policy(ies)
To provide for a variety of land uses which complement adjacent
communities in eastern Ventura County.
Specific Plan Conformance
The project provides a complementary mix of housing, commercial, business
park, and public and open space uses.
9.General Plan Policy(ies)
To provide a range of residential densities which will ensure a variety of
housing types to the residents of Moorpark.
Specific Plan Conformance
A mix of housing types will be provided ranging from one-acre single-
family residential lots to attached multiple family dwelling units at a density
of 15.0 units per acre. Four residential density classifications are included
in the plan.
4
10. General Plan Policy(ies)
To ensure that the location of residential land uses provides a harmonious
relationship between adjoining uses, natural features and the total
environment.
Specific Plan Conformance
All development areas are designed to blend sensitively with the natural
environment, and to achieve compatibility with surrounding properties.
11. General Plan Policy(ies)
New residential development should incorporate good design standards and
maintain the character of the community. Design standards include open
space, landscaping, circulation, off-street parking, architectural compatibility
with the surroundings, and others.
Specific Plan Conformance
The specific plan contains detailed architectural and landscape guidelines,
the intent of which are to ensure a cohesive and high quality development.
Commercial
12. General Plan Policy(ies)
New commercial development should incorporate good design standards.
Design standards include landscaping, circulation, off-street parking,
agricultural compatibility with the surroundings, and others. New strip
commercial development should be discouraged; existing strip commercial
development should be encouraged to consolidate driveways, provide
adequate parking areas and landscaped areas.
5
43
Specific Plan Conformance
The specific plan contains detailed architectural and landscape guidelines,
the intent of which are to ensure a cohesive and high quality development.
13. General Plan Policy(ies)
To encourage commercial developments to adopt a harmonious architectural
style with appropriate landscaping and buffer areas.
To provide for a range of commercial facilities which serve the residents
of the community and encourage new employment opportunities.
Specific Plan Conformance
A variety of facilities including subregional and neighborhood commercial
will be provided in order to serve residents of the project and the City of
Moorpark, and to provide employment opportunities.
14. General Plan Policy(ies)
To provide adequate and appropriate traffic movement on adjoining arterials
with relation to location of commercial uses.
Specific Plan Conformance
The traffic improvements identified in the Project EIR will provide for
adequate traffic movement.
15. General Plan Policy(ies)
Industrial land should be encouraged in compact areas in convenient
proximity to transportation modes.
6
e
Specific Plan Conformance
Light industrial uses will be encouraged in the Business Park Planning Area.
Water Resources and Ouality
16. General Plan Policy(ies)
Prevent or discourage new agricultural and urban development which
degrade groundwater from location on aquifer recharge areas. Treat or
contain runoff which has substantial amounts of pollutants or contaminants
at the source where feasible, encourage land use design which will capture
water for groundwater recharge and maintaining aquifer recharge areas.
Specific Plan Conformance
The drainage facilities for the project will be constructed in accordance with
all local and state requirements.
17. General Plan Policy(ies)
Limit development in scenic, significant or fragile habitats, watersheds and
historical and cultural areas.
Specific Plan Conformance
Where significant habitats may exist, the appropriate local, state and federal
agencies will be consulted prior to Tentative Tract map approval.
7
45
Physical Environment/Hazard Areas
18. General Plan Policy(ies)
Development should be strongly discouraged on areas of natural or human-
made hazards or on hillsides above 20 percent slope or on ridgelines, or
in hazard areas where hazards cannot be mitigated without significant
adverse environmental effects and where public expenditures for mitigating
would not be cost effective.
Specific Plan Conformance
Development shall not take place in areas where it is determined to be
hazardous or unsafe. Detailed studies may be necessary prior to Tentative
Tract map approval.
19. General Plan Policy(ies)
Floodplains, fire hazard areas, landslide areas, potentially active faults, and
areas with high liquefaction potential should be placed in an open space
designation on the plan or development in these areas should be adequately
protected from these hazards.
Specific Plan Conformance
Development shall not take place in areas where it is determined to be
hazardous or unsafe. Detailed studies may be necessary prior to Tentative
Tract map approval.
6
Air Quality
20. General Plan Policy(ies)
Patterns of development should be encouraged which will enhance air
quality.
Specific Plan Conformance
All air quality requirements shall be incorporated into project design.
Recreation
21. General Plan Policy(ies)
Reserve land use options for future regional parks and recreational
development.
Specific Plan Conformance
Consistent with City Council direction, a 27.2-acre city park site is proposed
in the land use plan.
22. General Plan Policy(ies)
The future acquisition of parks should be designated to serve local and
regional needs, and should be consistent with the countywide master plan
for parks. Improvements to existing local parks should be encouraged as
well as the development of additional parks as the need arises. Future
acquisitions and improvement should consider the concerns of this plan with
respect to traffic, air quality, water, etc.
9
17
Specific Plan Conformance
Consistent with City Council direction, a 27.2-acre city park site is proposed
in the land use plan.
23. General Plan Policy(ies)
Bicycling, equestrian and hiking trails should be developed as a part of the
communitywide trail system.
Specific Plan Conformance
Trails will be developed in accordance with the communitywide trail system.
24. General Plan Policy(ies)
To establish sites for 'park and recreational facilities as necessary in
accordance with the distribution of population and in locations that provide
a harmonious relationship between adjoining uses.
Specific Plan Conformance
The provisions for parks far exceeds the local park requirements.
Energy
25. General Plan Policy(ies)
Encourage energy conservation through land use patterns which minimize
energy consumption.
10
qg
Specific Plan Conformance
All city and state energy conservation measures shall be employed.
Open Space
26. General Plan Policy(ies)
To encourage.appropriate types and amounts of open space in and around
urban development.
Specific Plan Conformance
The City Council approved plan provides for approximately 50 percent of
the site as open space.
27. General Plan Policy(ies)
To encourage the preservation of visually unique terrain, vegetation and
water resources.
Specific Plan Conformance
The City Council decision designating the open space areas was based upon
these considerations.
28. General Plan Policy(ies)
Encourage adequate provisions for open spaces which respect natural
features, scenic qualities and historical and cultural resources.
11
4/
Specific Plan Conformance
The City Council decision designating the open space areas was based upon
these considerations.
29. General Plan Policy(ies)
Excessive and unsightly terracing, grading and filling of hillsides shall be
strongly discouraged. Development which will obscure or alter the natural
ridgelines shall be strongly discouraged.
Specific Plan Conformance
Grading plans will be prepared in concert with the city staff and shall be
implemented in as sensitive a manner as feasible.
29. General Plan Policy(ies)
Historically significant and archaeologically sensitive areas shall be identified
and preserved.
Specific Plan Conformance
In the event that historic artifacts are encountered, all appropriate steps for
their preservation shall be taken.
Community Facilities
30. General Plan Policy(ies)
Encourage cultural, educational, and recreational open space in and around
community facilities.
12 ..
Specific Plan Conformance
The site designated as Dedicated City Use is surrounded on all sides with
open space.
31. General Plan Policy(ies).
Encourage the location of community facilities in close proximity to major
arterials and public transportation.
Specific Plan Conformance
The site designated as Designated City Use is located at the corner of
Spring Road and New Los Angeles Avenue.
32. General Plan Policy(ies)
Development shall be permitted only where adequate public services are
available or can be provided readily. Public services shall include fire,
police, water, schools, roads, and sanitation facilities.
Specific Plan Conformance
All requirements for public services shall be met.
Housing
33. General Plan Policy(ies)
A diversity of housing unit types and lot sizes should be provided to meet
various housing needs.
13
Specific Plan Conformance
A mix of housing types will be provided ranging from one-acre single-
family residential lots to'attached multiple family dwelling units at a density
of 15.0 units per acre.
34. General Plan Policy(ies)
Densities that will accommodate multiple units should be designated on the
plan.
Specific Plan Conformance
A mix of housing types will be provided ranging from one-acre single-
family residential lots to attached multiple family dwelling units at a density
of 15.0 units per acre.
35. General Plan Policy(ies)
Encourage design standards that will promote housing units which are
soundly constructed and are energy efficient.
Specific Plan Conformance
All state and local requirements shall be observed in the construction of
housing units.
36. General Plan Policy(ies)
Encourage a development mix which will provide for the diverse needs of
the community.
14
5:02
Specific Plan Conformance
The specific plan assures the provision of housing for socioeconomic diverse
population groups.
37. General Plan Policy(ies)
To ensure that due regard is given to the types, densities and the
appearance of all housing developments so that necessary needs are met
and a harmonious relationship exists between adjoining uses, natural features
and the total environment.
Specific Plan Conformance
The specific plan provides for a wide range of housing types and densities.
All development areas are designed to blend sensitively with the natural
environment, and to achieve compatibility with the surrounding properties.
Community Identity
38. General Plan Policy(ies)
To encourage quality and effective controls in urban design through
thoughtful and consistent plans and programs such as agricultural controls.
Specific Plan Conformance
The specific plan provides for uses and design guidelines which will achieve
the intent of this policy.
15
cS
39. General Plan Policy(ies)
To encourage the development of district and visual amenities in major
roads, commercial centers, industrial areas and residential neighborhoods.
Specific Plan Conformance
The specific plan provides for uses and design guidelines which will achieve
the intent of this policy.
40. General Plan Policy(ies)
To encourage the distinct and unique design and function of commercial
centers.
Specific Plan Conformance
The specific plan provides for uses and design guidelines which will achieve
the intent of this policy.
41. General Plan Policy(ies)
To encourage the implementation of land use patterns which cultivate a
cohesive, well-distributed configuration for development.
Specific Plan Conformance
The land use plan, as mandated by the City Council, will achieve the intent
of this policy.
42. General Plan Policy(ies)
To encourage the integration of good urban design principles with all phases
16
Se/
of land use decisions and development.
Specific Plan Conformance
The land use plan, as mandated by the City Council, will achieve the intent
of this policy.
Fire
43. General Plan Policy(ies)
New residential development shall be discouraged in high-fire hazard areas.
Specific Plan Conformance
All development shall meet all regulations and requirements of the City
Fire Department and the fuel modification program in the specific plan.
44. General Plan Policy(ies)
Permanent structures erected in or near high fire-hazard areas should be
required to be constructed of fire-proof materials to as great an extent as
is feasible.
Specific Plan Conformance
All development shall meet all regulations and requirements of the City
Fire Department and the fuel modification program in the specific plan.
45. General Plan Policy(ies)
The planting of fire-retardant groundcover will be encouraged around any
development in or near high fire-hazard areas.
17
5
Specific Plan Conformance
All development shall meet all regulations and requirements of the City
Fire Department and the fuel modification program in the specific plan.
Police
46. General Plan Policy(ies)
Adequate police protection should be promoted and maintained.
Specific Plan Conformance
All regulations of the Police Department shall be incorporated into project
design.
47. General Plan Policy(ies)
Staff and equipment should reflect the needs of the population and various
types of development.
Specific Plan Conformance
All regulations of the Police Department shall be incorporated into project
design.
48. General Plan Policy(ies)
Safe, separate, and convenient paths for bicyclists and pedestrians should
be constructed so as to encourage these alternate forms of non-polluting
transportation.
18
Specific Plan Conformance
Implementation of the pedestrian and bike trails in the specific plan will
achieve the intent of this policy.
49. General Plan Policy(ies)
Planting and landscaping along major arterials shall be encouraged so as
to mitigate visual and erosion problems.
Implementation of the specific plan landscape guidelines will achieve the
intent of this policy.
Specific Plan Conformance
Implementation of the specific plan landscape guidelines will achieve the
intent of this policy.
50. General Plan Policy(ies)
To upgrade the current condition of streets and related facilities, such as
parking lots, street lamps, bike racks, etc., and to provide for adequate off-
street parking and other facilities in conjunction with future development.
Specific Plan Conformance
Off-street parking shall be provided in accordance with the City of
Moorpark parking regulations.
51. General Plan Policy(ies)
All well sites that have been abandoned or are longer producing shall be
restored to their original condition as nearly as practicable.
19
17
Specific Plan Conformance
No abandoned well sites exist on the property.
2. Noise Element
The goal of the Noise Element is to ensure that the health and well-being of the citizens
of Moorpark are not compromised by exposure to excessive and possibly harmful levels
of noise. This will serve to provide a quality environment in which the citizens of
Moorpark may live and have assurance of continued health and well-being.
The Moorpark Noise Element includes the development of strategies for the abatement
of excessive noise exposure through regulatory mechanisms, the protection of existing
regions in the city from excessive noise exposure, and to reduce the impact of noise from
all sources.
Major sources of noise to the project include traffic on surrounding roadways. A portion
of the project is located within the 65 CNEL. Acoustical design features which satisfy
the interior noise standards of the city will be incorporated into the final building plans
for the project.
3. Open Space, Conservation and Recreation Element
This element of the General Plan establishes the framework, for the provision,
maintenance and enhancement of open space, recreation, conservation, and agricultural
areas for the purposes of promoting the quality 'of life of the citizens of Moorpark.
The Carlsberg Specific Plan implements the goals of the Open Space, Conservation and
Recreation Element through the provisions of a 27-acre public park, 213 acres of open
space and extensive hiking and bicycle trails. In addition, a four-acre site will be
dedicated to the city for public use as is deemed appropriate.
20
4. Circulation Element
The major goals set forth in the Circulation Element of the General Plan specify that
transportation-within the city must be provided in a safe, efficient manner. Specifically,
a reasonable level of service for streets and adequate public transportation facilities are
required.
The Carlsberg Specific Plan project is consistent with. the Circulation Element and
implements it in that it provides for the safe and efficient movement of traffic through
the proper placement of access/egress.points and required traffic improvements (eg.,
travel lanes, turning pockets and traffic signals. Additionally, improvements including
landscaping will be made to street surrounding the project in order to facilitate traffic
movement and provide attractive streetscapes.
5. Housing Element
The overall goals of the Housing Element of the City of Moorpark are as follows:
Adequate provision of decent, safe housing for all Moorpark residents without regard to
race, age, sex, marital status,. ethnic background or other arbitrary considerations.
Adequate provision of housing allowing maximum choice by type, tenure and location
with particular attention to the provision of housing for the elderly, low and moderate
income families, handicapped and other households identified as having special housing
needs.
Encouraging growth within the city through the identification of suitable parcels for
residential development, changes in land use patterns and conscientious recycling of
property to the highest and best use.
Developing a balanced residential community which is accessible to employment,
transportation, shopping, medical services, governmental agencies and any other services
needed for a well-rounded community.
21
SQ
The proposed project provides for a wide range of housing types. With 552 dwelling
units proposed the breakdown is as follows:
Number of
Type Dwelling Units
Single family 1-acre lots 55
Single family 9,000 SF lots 141
Single family 5,000 SF lots 167
Multi Family units 189
SF = square foot)
This broad variation in unit types with easy access to shopping, transportation and
employment uses will serve to further the goals of the city's Housing Element.
6. Safety Element
The primary objective of the Safety Element is to ensure that hazard issues including
geologic and seismic hazards, floods, fire and landslides, be accounted for in the planning
process.
All future buildings on the site will incorporate state-of-the-art design and construction
measures to minimize any potential hazards.
22
y , /)
l L -
CITY COUNCIL PUBLIC HEARING - AUGUST 1, 1990 - CARLSBERG SPECIFIC
PLAN EIR (CITY OF MOORPARK)
As stated, PBR competed the environmental analysis for the Draft EIR for the Carlsberg
Specific Plan which is before you this evening. Our consultant team also included
Austin-Foust Associates (traffic engineers), and Richard Burgess (biologist).
The Notice of Preparation for the project was filed with the State Clearinghouse in
March 1990 and the Draft EIR was distributed by the State Clearinghouse to state
agencies and to the public on June 6, 1990. The end of the forty-five day review period
for public comment on the Draft EIR was July 20, 1990. Our staff have received eleven
letters of public comments on the Draft EIR. Preliminary responses were forwarded to
the Council. However, additional responses on traffic issues are forthcoming in the next
week. I will be commenting on both the Draft EIR and selected public comments.
In preparing the Draft EIR, PBR has complied with all the requirements of the
California Environmental Quality Act and City procedures. As indicated in the Table
of Contents, the Draft EIR includes evaluation of existing conditions and project impacts,
and recommends mitigation measures for a wide variety of topics, including: land use,
hydrology,geology/soils,biological resources,cultural resources, transportation/circulation,
air quality, acoustics, landform modifications/aesthetics, socioeconomics,public service and
utilities, and open space/parks.
All EIR reports use a "specialized" terminology. The evaluation of project impacts
focuses on physical changes in the environment caused by the project. Project impacts
are classified as beneficial or adverse. Conclusions are also made whether the impact
are considered significant or not significant, with or without the recommended mitigation
measures throughout the document. The Draft EIR serves as a disclosure document so
the public and the City may consider the probable environmental impacts if the project
is approved and developed.
A Summary of the Draft EIR is included on pages 3-12, which is the green insert at the
front of the document. I will be commenting briefly on the major conclusions reached
in the Draft EIR, and on whether the anticipated impacts may be reduced or eliminated
by the recommended actions and requirements, which we call mitigation measures.
Proceeding then, by summarizing selected topics through the Draft EIR, the major
conclusions are:
Land Use. While buildout of the project will result in development of 280 acres, the
project proposes 213.5 acres of open space onsite. The conversion of the property to
other uses in not considered significant by itself and the impacts of project buildout are
discussed in other topical areas.
Hydrology. With development, increase in runoff will occur from the project site.
However, since the runoff will be conveyed to storm channels and its velocity controlled
by retention basins or other structures, the project's impacts after mitigation are not
considered significant. The proposed drainage facilities are shown in Exhibit 5. Runoff
during grading activities may also be controlled by grading only in the non-rainy season
and preventing transport of sediment offsite.
Geology/Soils. The soil and geological characteristics of the project site have been
evaluated by qualified geologists and soil engineers. With the required mitigation
measures, development is considered feasible from a technical standpoint without
significant adverse environmental impacts. Some concerns were expressed regarding the
location and potential for earthquakes (seismic activity) along the Simi-Santa Rosa fault,
which passes through the southern portion of the site (SF-1 ACRE), shown in Exhibit
7. There is some indication that the Simi-Santa Rosa fault should be considered "active".
As indicated in Response to Comment 1-18 in the Final EIR, a geological study of a
branch of the Simi-Santa Rosa fault in the City of Camarillo concluded the fault in that
location should be considered "active". Although the State Division of Mines and
Geology is reviewing the analysis, it has not designated the fault as an Alquist Priolo
Special Study Zone.
The Simi-Santa Rosa fault onsite in the SF-1 acre subarea remains classified as
potentially active" until additional investigations are conducted. This investigation should
be conducted prior to submittal of tentative maps for the SF-1 acre subarea.
The current mitigation measures included in the Draft EIR will assure that no seismic
safety hazard exists for future residents of this area of the project. The comments on
page 35 of the Draft EIR indicating the San Andreas fault is more probable to effect
the site should be noted. As indicated in the Draft EIR, buildings conforming to the
Uniform Building Code can withstand the estimated accelerations on site from either the
San Andreas or Simi-Santa Rosa faults.
Biological Resources. The project site includes several important biological resources,
Exhibit 8) including riparian areas (streams and vegetation), coast live oaks, southern
oaks, and two plant species classified as threatened and rare, respectively. The first is
an annual flower of the sunflower family, called Lyon's Pentachaeta; which is also a
Candidate" for listing.as rare and endangered by the U.S. Fish and Wildlife and by the
California Department of Fish and Game. Approximately 1,000 plants occur onsite.
The second is the Catalina Mariposa Lily, an attractive annual plant with white flowers.
Both the San Diego Horned Lizard and the Least Bell's Vireo (bird), which are federal
candidate species, were previously located onsite.
The mitigation measures require the Lyon's Pentachaeta be preserved in place onsite
and the Catalina mariposa lily may be salvaged and replanted elsewhere. Other
mitigation measures assure that wildlife movement corridors are maintained, springs
onsite are retained and riparian habitat is partially retained. All oak trees onsite will
be surveyed and a program for their retention or replanting developed. With the
mitigations recommended in the Draft EIR, impacts on biological resources are
considered less than significant.
Traffic/Circulation. Without mitigation, the traffic impacts of the project would be
unacceptable. However, extensive mitigation measures are proposed which require an
appropriate internal roadway system, the widening of Tierra Rejada Road along the
project site and participation in "fair share" funding of areawide traffic improvements.
The projected level of service at the Los Angeles/Spring Road intersection will not be
acceptable if the project is buildout prior to the extension of State Route 118.
The traffic analysis completed for the Draft EIR included valuation of the ten (10)
proposed General Plan Amendments within the City. Additional traffic analysis will be
available prior to the next public hearing, which will evaluate project buildout with the
extension of State Route 23 to State Route 118.
Air Ouality. The Ventura County Air Quality Management Plan seeks to improve air
quality within the basin and City by reducing the total number of vehicular trips. The
air quality analysis indicates the project's traffic impacts on local air quality are not
significant for CO emissions but a variety of mitigation measures are recommended to
reduce vehicular emissions and improve regional air quality. These measures include
encouraging ridesharing, a balance of jobs and housing in the subregion, and use of
transit services.
As indicated in comments from the Air Pollution Control District, the District indicates
the project will have a significant impact on air quality because of the projected daily
nitrogen oxide and reactive organic compound emissions. However, as noted in our
responses, over 85 percent of the emissions are due to mobile vehicular sources. By
adding employment in a "housing rich" area, the project reduces total vehicle miles, and
lowers overall regional emissions. We feel the mitigation measures proposed in the Draft
EIR for potential traffic and air quality impacts of the project are both appropriate and
comprehensive; and provide adequate mitigation measures for the potential air quality
impacts of the project.
Landform/Aesthetics. Buildout of the project will require grading on approximately 280
acres of the 479 acre site. Most prominent ridgelines are preserved and slopes above
20 percent are generally retained. Grading onsite is balanced and scenic views of the
site from Spring Road, the Moorpark Freeway and Tierra Rejada Road will be main-
tained through open space setbacks and implementation of the Landscape Concept Plan.
As indicated in your staff report, members of the public have objected to the changes
in the viewshed easterly across Spring Road in the two previous public hearings. The
Planning Commission has also recommended changes of density in the residential subarea
along Spring Road and Tierra Rejada Road.
Acoustics. The potential cumulative noise impacts from area traffic upon adjacent areas
were evaluated for five locations onsite. All locations, except a portion of the southeast
area (SF 1-ACRE) exposed to freeway traffic noise levels of 67 CNEL, are in areas of
acceptable noise levels. It is anticipated these noise impacts can be mitigated.
Public Services. Increased demands for all public services will occur with buildout of the
project, including school and library services. The project will generate 439 students (p.
100). Builders will be required to pay all required school impact fees to the Moorpark
Unified School District and all tentative maps must be submitted to the District for
review and comment for potential impact on Peach Hill School. The District desires
to locate a new middle school onsite, which would be permitted by the proposed Specific
Plan.
The Planning Commission has recommended that Planing Area 3 be designated a school
site and not SF-9000. However, no agreement to located a school onsite has been
finalized to date. The mitigation measures also require the applicant provide
contributions for needed library facilities and services.
Open Space/Parks. While public use of the open space onsite may be partially restricted
because of sensitive habitats, the project included plans for a 27.2 acre park. A
mitigation measure requires the park to be developed prior to occupancy of 150 dwelling
units.
The Draft EIR includes a variety of other information which I have not included in this
summary, including the discussion of project alternatives, and a general discussion of
cumulative impacts of the ten proposed General Plan Amendments within the City.
Combined, the Amendments propose an additional 2,524 dwelling units and approximately
774,000 square feet of commercial and industrial uses.