Loading...
HomeMy WebLinkAboutAG RPTS 2009 0318 RDA REGMEIYT {P wa �y c� � ESTABLISHED � AIAM It gar % k '�t1Fp Resolution No. 2009 -207 of MOORPARK REDEVELOPMENT AGENCY REGULAR MEETING AGENDA WEDNESDAY, MARCH 18, 2009 7:00 P.M. Moorpark Community Center 799 Moorpark Avenue 1. CALL TO ORDER: 2. ROLL CALL: 3, PUBLIC COMMENT: 4, REORDERING OF, AND ADDITIONS TO, THE AGENDA: 5. PRESENTATION /ACTION /DISCUSSION: A. Consider Approval of High Street Streetscape Conceit. Staff Recommendation: 1) Select the Curvilinear Alignment as the concept for High Street Streetscape; and 2) Direct staff to request proposals for construction drawings for implementation of the High Street Streetscape selected concept. (Staff: Barry Hogan) 6. CONSENT CALENDAR: (ROLL CALL VOTE REQUIRED) A. Consider Minutes of Regular Meeting of February 18, 2009. Staff Recommendation: Approve the minutes. B. Consider California Redevelopment Association (CRA) Repuest for Financial Support for Legal Services. Staff Recommendation: Provide financial support in the amount of $281.00 to the CRA to assist with the suit against the State of California. (Staff: David Moe) Redevelopment Agency Agenda March 18, 2009 Page 2 6. CONSENT CALENDAR: (continued) C. Consider Granting Sidewalk Easements to the City of Moorpark on Agency Owned Property Located at 1063, 1073, 1095, 1113, 1123, 1293, and 1331 Walnut Canyon Road. Staff Recommendation: Approve granting sidewalk easements to the City of Moorpark and authorize the Executive Director to execute any documents need to affect this transaction. (Staff: David Moe) D. Consider Award of Contract for the Walnut Canyon Storm Drain Improvements/West High Street Rehabilitation &Parking Lot Project (Project 5052) and Resolution Amending the Fiscal Year 2008/09 Budget to Appropriate Funds for the Project. Staff Recommendation: 1) Waive a minor irregularity addressed in the agenda report and award a contract to Toro Enterprises, and authorize the Executive Director to execute the construction contract in the amount of $1,153,058.50 for the subject project; 2) Authorize the Executive Director to amend the construction contract for project contingencies in an amount not -to- exceed $115,000, if and when the need arises for extra work and services; 3) Authorize the Executive Director to sign a consultant agreement with RJR Engineering Group for inspection, geotechnical observation, and testing services in an amount not -to- exceed $55,000; 4) Authorize the Executive Director to sign a consultant agreement for survey services in an amount not -to- exceed $20,000; and 5) Adopt Resolution No. 2009- ,amending the FY 2008/09 Budget to fund Project 5052. ROLL CALL VOTE REQUIRED (Staff: Yugal Lail) 7. CLOSED SESSION: A. CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED LITIGATION Significant exposure to litigation pursuant to Subdivision (b) of Section 54956.9 of the Government Code: (Number of cases to be discussed - 4) B. CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED LITIGATION Initiation of litigation pursuant to Subdivision (c) of Section 54956.9 of the Government Code: (Number of cases to be discussed - 4) 8. ADJOURNMENT: Redevelopment Agency Agenda March 18, 2009 Page 3 All writings and documents provided to the majority of the Agency regarding all open- session agenda items are available for public inspection at the City Hall public counter located at 799 Moorpark Avenue during regular business hours. The agenda packet for all regular Redevelopment Agency meetings is also available on the City's website at www.ci.mooraark.ca.us. Any member of the public may address the Agency during the Public Comments portion of the Agenda, unless it is a Public Hearing or a Presentation /Action/ Discussion item. Speakers who wish to address the Agency concerning a Public Hearing' or Presentations /Action /Discussion item must do so during the Public Hearing or Presentations /Action/ Discussion portion of the Agenda for that item. Speaker cards must be received by the City Clerk for Public Comment prior to the beginning of the Public Comments portion of the meeting; for a Presentation /Action /Discussion item, prior to the Chair's call for speaker cards for each Presentation /Action/ Discussion agenda item; and for a Public Hearing item, prior to the opening of each Public Hearing, or beginning of public testimony for a continued hearing. A limitation of three minutes shall be imposed upon each Public Comment and Presentation /Action /Discussion item speaker. A limitation of three to five minutes shall be imposed upon each Public Hearing item speaker. Written Statement Cards may be submitted in lieu of speaking orally for open Public Hearings and Presentation /Action /Discussion items. Any questions concerning any agenda item may be directed to the City Clerk's office at 517 -6223. In compliance with the Americans with Disabilities Act, if you need special assistance to review an agenda or participate in this meeting, including auxiliary aids or services, please contact the City Clerk's Division at (805) 517 -6223. Upon request, the agenda can be made available in appropriate alternative formats to persons with a disability. Any request for disability- related modification or accommodation should be made at least 48 hours prior to the scheduled meeting to assist the City staff in assuring reasonable arrangements can be made to provide accessibility to the meeting (28 CFR 35.102- 35.104; ADA Title 11). Redevelopment Agency Agenda March 18, 2009 Page 4 STATE OF CALIFORNIA ) COUNTY OF VENTURA ) ss CITY OF MOORPARK ) AFFIDAVIT OF POSTING I, Maureen Benson, declare as follows: That I am the Assistant City Clerk of the City of Moorpark and that a notice for a Regular Meeting of the Moorpark Redevelopment Agency to be held Wednesday, March 18, 2009, at 7:00 p.m. in the Council Chambers of the Moorpark Community Center, 799 Moorpark Avenue, Moorpark, California, was posted on March 13, 2009, at a conspicuous place at the Moorpark Community Center, 799 Moorpark Avenue, Moorpark, California. declare under penalty of perjury that the foregoing is true and correct. Executed on March 13, 2009. Maureen Benson, Assistant City Clerk FnEM 5-- A,6.. _ CITY OF A )ORPARK, CALIF Redevel 3 -it Agency Meg. �Je 6Y: MOORPARK REDEVELOPMENT AGENCY AGENDA REPORT TO: Honorable Agency Board of Directors FROM: Barry Hogan, Deputy City Manage DATE: March 5, 2009 (MRA Meeting of 3/18/2009) SUBJECT: Consider Approval of High Street Streetscape Concept BACKGROUND On December 27, 2007 the Agency released a Request for Proposals (RFP) for the provision of design services to present viable streetscape alternatives to enhance the old town feel of High Street. The Agency selected Roger Cantrell /Lawrence Moss and Associates to perform the work. Conceptual plans were prepared by Lawrence Moss and Associates and reviewed by Agency staff. Two community meetings were held with the business and property owners of High Street. The meetings, held at the Chamber of Commerce offices on December 4, 2008 and February 12, 2009 from 5:30 to 6:30 p.m., were well attended and the conceptual plans were well received. DISCUSSION Two conceptual plans were created for consideration regarding the High Street streetscape. A copy of the two plans was provided to the City Council under separate cover. Both plans were created with the following minimum criteria: • All work on the streetscape would be performed within the existing right -of -ways. No private land would be added. • Walnut, Bard and Magnolia Streets between High Street and Charles Street would be included as part of the High Street streetscape. • There would be no reduction in the amount of on- street parking. • All existing pepper trees would remain in place and become a continuing part of the High Street streetscape. • The conceptual designs would not prevent the continuation of the two long term annual events on High Street, i.e. Country Days and Roamin' Relics. • Both concepts would incorporate the anticipated Aszkenazy development plans. 'D4J(al, "1 Honorable Agency Board of Directors March 18, 2009 Page 2 • Both concepts would enhance pedestrian access, upgrade the aesthetics of the street and encourage potential shoppers to "walk the street." • Both concepts utilize the same basic components, i.e. angle parking, "bulb out" intersections, new bus stop enclosures, enhanced sidewalks, lattice covered sidewalk areas, public art, raised planters, new street lights, and new arched street signs. The Concepts: Both conceptual plans recreate the feeling of old town Main Street with a bit of an updated twist. The streetscape designs encourage pedestrian traffic, giving the pedestrian a reason and desire to move from one shop to another shop or one business to another business along the reach of the street. We want being on High Street to be the highlight of the shopper's day. We want people to visit, to linger, to plan events on the street, to tell their neighbors what they are missing if they do not go to High Street. Two concepts are presented for Agency consideration. One is a straight alignment and one is a curvilinear alignment. The basic difference between the two alignments is that the straight alignment has angle parking all on one side while the curvilinear alignment alternates the angle parking from north to south along High Street. Both concepts re- stripe the existing parking along High Street into angle parking, add more pepper trees on the eastern end of the street, add raised planters for shrubs and flowers, change the street lights out for more period lighting with "yard arms" for hanging plants and GFI electrical outlets for future on- street events, add public art at appropriate locations along the street, and change out the existing bus bench enclosures for a more period design that will fit with the overall Main Street character. In both designs, the intersections of Walnut, Bard and Magnolia would be enhanced with decorative pavement to visually shorten the length of High Street. In addition, three mid -block crosswalks have been added to make it easier for pedestrians to shop both sides of High Street. Both plans also provide for better identification of High Street with the introduction of four Over- street wrought iron signs at strategic locations. These signs would be lit with exposed bulbs to better identify the street, create a sense of entry, tie the street together visually, and to add a festive nature to the street. Color copies of both concepts as well as detail illustrations of portions of the concepts are available on the City's website as part of the Council /Redevelopment Agency agenda packet. Large color concept maps will be available at the Agency meeting. Costs and Maintenance: The consultant, Larry Moss & Associates, has prepared a detailed cost estimate of what the improvements to High Street Streetscape will cost. It should be noted that while the cost estimates are detailed, they are still estimates. Actual costs could be somewhat higher or lower depending upon whether the improvements are phased or installed at one time, the state of the economy, availability of firms to perform the work and other factors beyond the Agency's control. The estimated costs for both alignments are essentially the same; the straight alignment estimate is $4.6 million and the curvilinear alignment is $4.5 million. Both of these cost estimates include improvements on Walnut, Bard and Magnolia Streets. SACommun' Develo menMi h Street\Moss Desi ns \090318 CC Re oitdoc f 0002 �Y P 9 9 P Honorable Agency Board of Directors March 18, 2009 Page 3 Currently, the Agency /City maintains the Pepper Tree Grove along High Street. The additional trees proposed by both Plans would also be maintained by the Agency /City. The street lights are now maintained through the Citywide Lighting District and would continue to be maintained as such. The cost of replacing the existing street lights is included in the estimated costs for both plans. It is anticipated that the City would maintain all of the items on High Street, Walnut Street, Bard Street and Magnolia Street that it normally maintains on all public streets within the City. Maintenance of proposed raised planters, benches, and street furniture has yet to be determined by the Agency /Council. Additional Programs for High Street and Adiacent Streets: The Agency and City have been committed to the improvement of the High Street area. There have been discussions at the staff and Agency /Council level regarding potential programs for the improvement of the building facades through a street fagade program. There have also been discussions about reoccurring annual events that could be held on High Street in addition to Country Days and Roamin' Relics, such as Holiday Craft Fairs, and Taste of Moorpark. Presently there are not enough businesses and shops along High Street to reach a nucleus support group to plan and run such events. Private investments in businesses or the formation of a Merchant/Business Association may also assist in making High Street a viable shopping area for Moorpark now and in the future. FISCAL IMPACT In these economic times it may be imprudent, if not impossible, to fund the entire streetscape improvements at one time. There are some items that can be done in phases that would provide a boost to the overall appearance and feel of High Street that the Agency could consider. For example, the four steel arched signs could be installed at a total cost of approximately $130,000. Decorative benches and trash receptacles could be installed at a total cost of approximately $57,200. New bus bench enclosures could be installed at a total cost of approximately $40,000. If all of these suggested improvements are done as Phase 1 of the Streetscape Improvement it would total $227,200. It should be noted that there would be a need to have construction plans drawn up in order to proceed with the rest of the streetscape. Subsequent phases should be divided up by block or north or south in order to minimize disruption of the businesses. The majority of the construction improvements to High Street, Walnut Street, Bard Street and Magnolia Street should be phased to coordinate with the Aszkenazy Development. Depending upon which concept is selected, the cost of the High Street Streetscape would be $4.463 to $4.57 million. The cost for preparation of construction drawings is estimated to be $270,000. A detailed cost estimate has been prepared by Lawrence R. Moss &Associates and is attached for your review. It should be noted that there are some items in the cost estimate that are not included in the total cost since a selection has not yet been made, in particular the pavement treatment for the intersections and SACommunity Development\High StreeMoss Designs \090318 CC Report.doc , )003 Honorable Agency Board of Directors March 18, 2009 Page 4 crosswalks and whether new light fixtures are to be used. Depending upon what is chosen there could be an additional cost of $380,000 added to each concept. STAFF RECOMMENDATION 1. Select the Curvilinear Alignment as the concept for High Street Streetscape. 2. Direct staff to request proposals for construction drawings for implementation of the High Street Streetscape selected concept. Attachment: 1. Cost Estimate S:1Community Development \High StreetWloss Designs \090318 CC Report.doc '�.? �.�� 0, { Page 1 of 6 ATTACHMENT 1 March 3, 2009 High Street Improvements (Between Moorpark Ave. & Spring Rd.) Opinion of Probable Costs Item Unit Cost Unit LAWRENCE R. Moss ASLA & ASSOCIATES INC 3458 OCEAN VIEW BLVD GLENDALE CA 812$18 (i1t1248 -5200 FAX #248 -6574 CALIFORNIA LICENSE flnI Quantity Cost High Street Improvements DEMOLITION Remove exist. Asphalt $2.40 S.F. 130,000 $312,000 Remove exist Curb & Gutter $7.00 L.F. 4,380 $30,660 Remove exist Sidewalk & Ramps $4.00 S.F. 47,460 $189,840 Remove exist. Street Light $350.00 EA. 25 $8,750 Remove exist. Ammenities $150.00 E.A. 15 $2,250 Move exist Fire Hydrants $3,000.00 EA. 4 $12,000 Remove 18" of Soil under asphalt where Planter will be $4.00 S.F. 2310 $9,240 Adjust exist. Round Manhole to Grade $2,000.00 L.S. 1 $2,000 Cap exist. Irrigation Lines $2,000.00 S.F. 1 $2,000 Adjust Water Valve Can $500.00 L.S. 1 $500 Protect exist. UtilityVaults $2,000.00 L.S. 1 $2,000 Protect exist. Water Meters $900.00 L.S. 1 $900 Protect exist. Trees in place $50.00 EA. 50 $2,500 Subtotal $574,640 EXCAVATION & GRADING Survey and Layout 4900 L.S. 1 $4,900 Grading $0.50 S.F. 177,210 $88,605 Subtotal $93,505 CONSTRUCTION (S&&1gh1A/ignmenV Construct New 4" Thick Asphalt Paving 8 8" Aggregate Base $4.50 S.F. 89,128 $401,076 Construct new Concrete Paving and Ramps $12.00 S.F. 52,790 $633,480 Construct new Concrete Curb & Gutter $30.00 L.F. 3,600 $108,000 Construct new 18" High Seatwall Planter $30.00 L.F. 115 $3,450 Construct new Overhead Trellis Structure $30.00 S.F. 1,520 $45,600 New Bus Stops $10,000.00 EA. 4 $40,000 Decorative Paving @ Intersection (Stamped Conc) $15.00 S.F. 13,377 $200,655 "L70L0,10#149)4" 201Y1g CIF I/ 11�'I:�PL`% /L7!?���fRl7)Jt?C�� 4jC1f.�c°d%1`17�C���L�11 /' ,$`h'�11�7 5F I, .t :7 % awir "L7 i /. /i�iC�!��E?L ':il,'�!''� °I!�?,~: L7(?:'�ii,',% Decorative Paving @ Central Crooswalk (Stamped Conc.) $15.00 S.F. 1,257 $18,855 6P r ' Jr 7 /; mac,• ,^ "L�ec�ral!i� P��I �!r�q L c•�ll�lL°!%c�iL7L7Sih' iii ��i`tf•�c°tS i7iti�Lii �/ �►' i7 .Ya:` -�Ull C ��I . y /,. 7 ! -f . New Stripping & Pavement Markings $15,000.00 L.S. 1 $15,000 Install Steel Arches wl Lighting 62' span $47,190.00 EA. 1 $47,190 Install Steel Arches wJ Lighting 52' span $54,615:00 EA. 3 $163,845 Install Steel Arches wj Lighting 52' span $13,100.00 E.A. 8 $i 04,800 Structural Engineering for Arches $15,000.00 L.S. 1 $15,000 Installation of Decorative Benches $1,200.00 EA 31 $37,200 Installation of Decorative Trash Receptacles $1,000.00 EA 20 $20,000 Installation of Decorative Light Posts with Planter Arms $4,100.00 EA. 25 $102,500 105221 ''? EA. ' 144- i-1 T�rir, r-Yr 1N0R1 -ALAMS 0 3-dIM!!991- 1%c77ht,F/-' ?4116: A5917. 1.717 c'S- '' S; 7,1t�! %L %��'.vtc�'�h�r_?lairhfi L�sf» Il:.f'?!F� s` t,' 71�f 15� +!it7't'i�r /t�?, ".�CI:I'" .'��` %,7�.�� ,�.�. ��t' ,iri ✓.� %.;i. Installation of Decorative Bollards $1,300.00 EA. 60 $78,000 Soil Import $30.00 C.Y. 128 $3,840 Traffic Control & Project Safety $15,000.00 L.S. 1 $15,000 Replace Signal Detector Loops $500.00 EA 12 $6,000 Subtotal $2,059,491 LANDSCAPE Soil Ammendment $0.35 S.F. 13,457 $4,710 Irrigation $54,205.00 L.S. 1 $54,205 36" Box Trees $900.00 EA 34 $30,600 Planting $3.50 S.F. 15,576 $54,516 90 Day Maintenance Period $10,000.00 L.S. 1 $10,000 Subtotal $154,031 " Grey Italic font line items represent various options arrd cost is not included in total. See Page 5 for Project Total High Street Improvements - Project # 7092 ��� �0 Page 2 of 6 CONSTRUCTION (a"dA/ignmenlj Construct New 4" Thick Asphalt Paving & 8" Aggregate Base $4.50 S.F. 81,942 $368,739 Construct new Concrete Paving and Ramps $12.00 S.F. 53,459 $641,508 Construct new Concrete Curb & Gutter $30.00 L.F. 3,642 $109,260 Construct new 18" High Seatwall Planter $30.00 L.F. 115 $3,450 Construct new Overhead Trellis Structure $30.00 S.F. 1,520 $45,600 New Bus Stops $10,000.00 EA 4 $40,000 Decorative Paving @ Intersection (Stamped Conc.) $15.00 S.F. 11,682 $175,230 "`Pe�:•?�,9rr:. /e F�� -rrrc� t�� /.trels�c�i���� ( �' 1a�l ;v��y,��;c��l,����,,��ti���� ,�'�'� % %; 4 ��_. 7 � `�,;�; �,`l`� �y��� •*4 ,�`/,�ar, /f? �'�3• :'?� '� il: ��1�: �?C;iir;,'? //n•`�t /�'(:, �✓;t�iir,7� 77 /ii' ^ r• -' � i /i:�.7 � ;, � , Decorative Paving @ Central Crosswalk (Stamped Conc.) $15.00 S.F. 1,397 $20,955 ' r7� <' ,, r, ry /' i ✓ 7 a. , -�„r , c.•. �• �..."i i :�(i {...• ��T . f'ii..i L.+. L •E?, t LZ C.. ,y, S.ti :t i/n i c... Ic.,.. %� E?.;(i, , r . , .. J. ,�. /• . , s. " L? �z�iz�Pl� f'�t•il1c7 CID 17t��YlC r� ?;•Sl�:`il,('( ,:'Il 1!; 0,014717�P ���! L1C � r. 1. � {�? aCf,���� Decorative Pavign at Interior Crosswalks $15.00 S.F. 518 $7,770 Jts ZV ' `� i 5 'N 14V New Stripping & Pavement Markings $15,000.00 L.S. 1 $15,000 Install Steel Arches wj Lighting 62' span $47,190.00 EA 1 $47,190 Install Steel Arches wJ Lighting 52' span $54,615.00 EA 3 $163,845 Install Decorative Arch Posts $13,100.00 EA. 8 $104,800 Structural Engineering for Arches $15,000.00 L.S. 1 $15,000 Installation of Decorative Benches $1,200.00 EA 31 $37,200 Installation of Decorative Trash Receptacles $1,000.00 EA 20 $20,000 Installation of Decorative Light Posts with Planter Arms $4,100.00 EA. 25 $102,500 c/Cy f�.. l r' /G�. /lG�. �1,. /� i./ JC � �. _L/.LCi ».. /C�`: /! � .. /l�.y �.:. /G. � ✓ [... S. ..... �� /: , �/.• ./ Installation of Decorative Bollards $500.00 EA. 60 $30,000 Soil Import $30.00 C.Y. 314 $9,420 Traffic Control & Project Safety $15,000.00 L.S. 1 $15,000 Subtotal $1,972,467 LANDSCAPE Soil Ammendment $0.35 S.F. 16,117 $5,641 Irrigation $54,205.00 L.S. 1 $54,205 36" Box Trees $900.00 EA 29 $26,100 Planting $3.50 S.F. 16,117 $56,410 90 Day Maintenance Period $10,000.00 L.S. 1 $10,000 Subtotal $152,355 HIGH ST. TOTAL (Straight Alignment): $2,881,667 HIGH ST. TOTAL (Curved Alignment): $2,792,967 " Grey Italic font line items represent various options and cost is not included in total. Al IG High Street Improvements - Project # 7092' `(� Walnut Street Improvements Demolition Remove exist Asphalt Remove exist Curb & Gutter Remove exist Sidewalk & Ramps Remove 18" of Soil where Planter will be Adjust exist. Round Manhole to Grade Cap exist. Irrigation Lines Protect exist. Utility Vaults Protect exist Water Meters Protect exist Trees in place Subtotal EXCAVATION & GRADING Survey and Layout Grading Subtotal CONSTRUCTION $2.40 S.F. 10,590 $25,416 $7.00 L.F. 590 $4,130 $4.00 S.F. 12,650 $50,600 $4.00 S.F. 418 $1,672 $900.00 L.S. 1 $900 $225.00 L.S. 1 $225 $500.00 L.S. 1 $500 $225.00 L.S. 1 $225 $50.00 EA. 1 $50 $83,718 $690.00 L.S. $0.50 S.F. Construct New 4" Thick Asphalt Paving & 8" Aggregate Base $4.50 S.F. Construct new Concrete Paving & Ramps $12.00 S.F. Construct new Concrete Curb & Gutter $30.00 L.F. New Stripping & Pavement Markings $2,500.00 L.S. Soil Import $30.00 C.Y. Subtotal LANDSCAPE Soil Ammendment $0.35 S.F. Irrigation $1.50 S.F. 36" Box Trees $900.00 EA. Planting $3.50 S.F. Subtotal WALNUT ST. TOTAL: * Grey Italic font line items represent various options and cost is not included in total. High Street Improvements - Project # 7092 1 $690 23,703 $11,852 $12,542 17,760 $79,920 3,120 $37,440 305 $9,150 1 $2,500 23 $690 $129,700 418 418 11 418 $146 $627 $9,900 $1,463 $12,136 $238,096 Page 3 of 6 J007 Bard Street Improvements Demolition Remove exist Asphalt Remove exist Curb & Gutter Remove exist Sidewalk & Ramps Remove 18" of Soil where Planter will be Adjust exist Round Manhole to Grade Cap exist Irrigation Lines Protect exist Utility Vaults Protect exist Water Meters Protect exist Trees in place Subtotal EXCAVATION & GRADING Survey and Layout Grading Subtotal CONSTRUCTION $2.40 S.F. 10,622 $25,493 $7.00 L.F. 590 $4,130 $4.00 S.F. 12,650 $50,600 $4.00 S.F. 219 $876 $900.00 EA. 1 $900 $225.00 L.S. 1 $225 $500.00 EA. 1 $500 $225.00 EA. 1 $225 $50.00 EA. 6 $300 $83,249 $690.00 L.S. $0.50 S.F. Construct New 4" Thick Asphalt Paving & 8" Aggregate Base $4.50 S.F. Construct new Concrete Paving & Ramps $12.00 S.F. Construct new Concrete Curb & Gutter $30.00 L.F. New Stripping & Pavement Markings $2,000.00 L.S. Soil Import $30.00 C.Y. Subtotal LANDSCAPE Soil Ammendment $0.35 S.F. Irrigation $1.50 S.F. 36" Box Trees $900.00 EA. Planting $3.50 S.F. Subtotal BARD ST. TOTAL- * Grey Italic font line items represent various options and cost is not included in total. High Street Improvements - Project # 7092 1 23,645 12,042 3,240 630 1 12 6,275 6,275 5 6,275 $690 $11,823 $12,513 $54,189 $38,880 $18,900 $2,000 $360 $114,329 $2,196 $9,413 $4,500 $21,963 $38,071 $248,162 Page 4 of 6 Magnolia Street Improvements Demolition Remove exist Asphalt Remove exist Curb & Gutter Remove exist Sidewalk & Ramps Adjust exist Round Manhole to Grade Cap exist Irrigation Lines Protect exist Utility Vaults Protect exist Water Meters Protect exist Trees in place Subtotal EXCAVATION & GRADING Survey and Layout Grading Subtotal CONSTRUCTION $2.40 S.F. 6,455 $15,492 $7.00 L.F. 440 $3,080 $4.00 S.F. 1,676 $6,704 $900.00 EA. 1 $900 $225.00 L.S. 1 $225 $500.00 EA. 1 $500 $225.00 EA. 1 $225 $50.00 EA. 10 $500 $27,626 460 L.S. $0.50 S.F. Construct New 4" Thick Asphalt Paving & 8" Aggregate Base $4.50 S.F. Construct new Concrete Paving & Ramps $12.00 S.F. Construct new Concrete Curb & Gutter $30.00 L.F. New Stripping & Pavement Markings $2,000.00 L.S. Subtotal $375,013 GRAND TOTAL LANDSCAPE Soil Ammendment $0.35 S.F. Irrigation $1.50 S.F. 36" Box Trees $900.00 EA. Planting $3.50 S.F. Subtotal MAGNOLIA ST. TOTAL: * Grey Italic font line items represent various options and cost is not included in total. 1 $460 12,030 $6,015 $6,475 6,455 $29,048 1,676 $20,112 440 $13,200 1 $2,000 $64,360 1,216 $426 1,216 $1,824 0 $0 1,216 $4,256 $6,506 $104,966 10% Architecture & Engineering $365,940 PROJECT SUBTOTAL (Straight Alignment includes side streets) $3,838,830 10% Contingency $383,883 10% Mobilization $383,883 GRAND TOTAL =41606,596 PROJECT SUBTOTAL (Curved Alignment includes side streets) $3,750,131 10% Contingency $375,013 10% Mobilization $375,013 GRAND TOTAL $4,500,157 Items not included: Traffic engineering. Note: Irrigation cost meyvary depending on water source location High Street Improvements - Project # 7092 Page 5 of 6 )009 Page 6 of 6 High Street Improvements (Park) Opinion of Probable Costs Note.- This es#mateis a estimate. Park Improvements Demolition Remove existing $3.00 S.F. 20,453 $61,359 Grading $0.50 S.F. 20,453 $10,227 Subtotal $71,586 CONSTRUCTION Construct New 4" Thick Concrete Sidewalk $12.00 S.F. 6,884 $82,608 T '`�" rhiC�Lr% t7Gc .?t�;,t��7st�c7'�i�c�i,�iilt� b��� %ht• >ti��J��i.�t7tirri` � �!:�; �zi -� �;•� yyr v,��;,���� -., Bandstand $50,000.00 L.S. 1 $50,000 Drinking Fountain $4,500.00 L.S. 1 $4,500 Installation of Decorative Light Posts $4,000.00 EA. 10 $40,000 Installation of Decorative Benches $2,500.00 EA 10 $25,000 Installation of Decorative Trash Receptacles $1,200.00 EA 5 $6,000 Installation of Decorative Fountain $80,000.00 L.S. 1 $80,000 Subtotal $288,108 LANDSCAPE Irrigation $21,732.00 L.S. 1 $21,732 Planting $50,000.00 L.S. 1 $50,000 90 Day Maintenance Period $10,000.00 L.S. 1 $10,000 Subtotal $81,732 PROJECT SUBTOTAL $441,426 10% Contingency $44,143 10% Mobilization $44,143 GRAND TOTAL $529,111 * Grey Italic font line items represent various options and cost is not included in total. High Street Improvements - Project # 7092 a P . -fzigfi Street Improvements oQ LL �41 Street Scene c� %aterials -�' '-? ()9M () t 1 - -- — 1 - -- J — - .} -.1 • � y`��� J _i ✓� .s .f vi ,tom r J ..� � J .d _ Miigk.Street Improvements —i Ran View `A' X. Q N „_�� ■ AW JTWh Street Improvemenu Ran View `B' O O N W I 4� t, .4-114 -1 (R)WNISMINGS ELEV AVON ugh Street Improvements XTS. 4 I CITY OF A )ORPARK, CALIF Redevel :) -it Agency Me# ITEM 6. A. womb 1 b r �- MINUTES OF THE REDEVELOPMENT AGENCY Agoruark, California February 18, 2009 A Regular Meeting of the Redevelopment Agency of the City of Moorpark was held on February 18, 2009, in the Community Center of said City located at 799 Moorpark Avenue, Moorpark, California. 1. CALL TO ORDER: Chair Parvin called the meeting to order at 7:21 p.m. 2. ROLL CALL: Present: Agency Members Lowenberg, Mikos, Millhouse, Van Dam, and Chair Parvin. Staff Present: Steven Kueny, Executive Director; Joseph Montes, General Counsel; Hugh Riley, Assistant Executive Director; Ron Ahlers, Finance Director; and Deborah Traffenstedt, Agency Secretary. 3. PUBLIC COMMENT: None. 4. REORDERING OF, AND ADDITIONS TO, THE AGENDA: None. 5. CONSENT CALENDAR: (ROLL CALL VOTE REQUIRED) MOTION: Agency Member Mikos moved and Agency Member Van Dam seconded a motion to approve the Consent Calendar. The motion carried by unanimous roll call vote. A. Consider Minutes of Regular Meeting of February 4, 2009. Staff Recommendation: Approve the minutes. B. Consider Resolution Authorizing Mid -Year Amendments to 2008/2009 Fiscal Year Budget. Staff Recommendation: Adopt Resolution No. 2009- 206, amending the FY 2008/09 budget as noted in Exhibits A & B of the resolution. ROLL CALL VOTE REQUIRED C. Consider Component Unit Financial Statements for the Fiscal Year Ended June 30, 2008 for the Redevelopment Agency of the City of Moorpark. Minutes of the Redevelopment Agency Moorpark, California Page 2 February 18, 2009 Staff Recommendation: Accept the Component Unit Financial Statements and receive and file this report. ROLL CALL VOTE REQUIRED D. Consider Authorizing the Executive Director to Write a Letter to the County- Auditor Regarding Payment into the Educational Revenue Augmentation Fund (ERAF) for Fiscal Year 2008 -09. Staff Recommendation: Authorize the Executive Director to send a letter to the Ventura County- Auditor advising of our intention to pay ERAF with redevelopment tax increment funds. 6. CLOSED SESSION: None was held. 7. ADJOURNMENT: MOTION: Agency Member Lowenberg moved and Agency Member Mikos seconded a motion to adjourn the meeting of the Moorpark Redevelopment Agency. The motion carried by unanimous voice vote. The time was 7:22 p.m. Janice S. Parvin, Chair ATTEST: Deborah S. Traffenstedt Agency Secretary ^9t)1D16 ITEM • CITY OF A )ORPARK, CALIF Redevel 3 -it Agency Met for Ole Al 22 jyo d s w BY: �rQ MOORPARK REDEVELOPMENT AGENCY AGENDA REPORT To: Honorable Agency Board of Directors 000000000 From: David C. Moe II, er Redevelopment Manager g Date: March 11, 2009 (Agency Meeting of 3/18/09) Subject: Consider California Redevelopment Association Request For Financial Support For Legal Services BACK aROUND &DISCUSSION On behalf of all redevelopment agencies, the California Redevelopment Association ( "CRA") has sued the State of California for violation of the Constitution when it approved taking $350 million from redevelopment agencies. CRA won the first step in the laver suit a few weeks ago when the court granted the request to certify all county auditors as a class of defendants. The merits of the case were scheduled to be argued on March 6, 2009, but that has now has been postponed until March 13, 2009. It is anticipated that the losing side will appeal. The suit against the State of California will be very expensive. The Attorney General's Office is vigorously defending the State's action to protect its proclaimed interest in revenue generated by redevelopment project areas. The CRA Board of Directors is committed to defending tax increment revenue and has authorized the expenditure of more than $600,000.00 for this litigation. However, CRA is not in a position to absorb all the legal costs. CRA's Board of Directors voted to impose a special fee on its membership to assist with the fight against the State. The Redevelopment Agency of the City of Moorpark's fee to help fight the State from this taking, and future raids, is $281.00. The letter received from CRA is attached as Exhibit A. FISCAL IMPACT The fiscal impact on the Agency's budget is minimal ($281.00) and can be absorbed in the current budget. STAFF RECOMMENDATION Provide financial support in the amount of $281.00 to the CRA to assist with the suit against the State of California. Exhibit A CRA letter dated 2/25/09 )0017 rXI-; IDI T A C lifornia Redevelopment Association Redevelopment. Building Better Communities February 25, 2009 Mr. Hugh Riley Assistant Executive Director City of Moorpark 799 Moorpark Avenue Moorpark;ilev, A 93 021 -113 6 Dear . ��CElVED .I , i '�'� Manager As you know, CRA, on behalf of all redevelopment agencies, has sued the State of California for violation of the Constitution when it approved taking $350 million from redevelopment agencies. We won the first round in the suit a few weeks ago when the court granted our request to certify all county auditors as a class of uefendants. The merits of the case will be argued on march 6, and regardless of which side wins, we expect the losing side to appeal. I am sure you understand that it is very expensive to fight the State of California. The Attorney General's Office is vigorously defending the State's actions, and we have retained the most capable legal team available to protect your interests. The CRA Board of Directors is committed to this fight and has authorized the expenditure of more than $600,000 in our current fiscal year for this litigation. CRA, however, is not in a position to absorb the full costs of this lawsuit. At their January 29 meeting, the CRA Board of Directors voted to raise the funds to pay for this lawsuit by imposing a special fee on our agency members. Just as the Board's decision to sue the State was not made lightly, this decision was made after careful consideration. Among the Board's considerations were the following: • CRA's reserves were significantly reduced by our successful efforts to defeat Propositions 90 and 98 and to pass Proposition 99; • CRA has held the line on our operating expenses, but, like you, we are negatively affected by the current economy; • We have seen a drop in registrations for our professional development events; and • We are losing private sector members and sponsorships as they cut their costs. Enclosed is the invoice for your agency for this special fee. The amount is based on the total amount of tax increment you receive annually. We are asking that you pay it now since we are incurring the costs of the lawsuit now. However, we know this comes as an unexpected expense and one that you may not have budgeted in the current .fiscal year. If you are not able to pay now, we would appreaciare payment as soon as practical. While no dues increase is ever good news, we ask that you weigh the amount of this fee against the amount the State will take from your agency this year and could take from your agency in future years. If you have questions, call me at (916) 448 -8760. Thank you for your continuing support of CRA! Sincerel , John F. S irey Executive Director 1400 K Street, Suite 204 • Sacramento, CA 95814 -3916 (916) 448 -8760 • fax (916) 448 -9397 wm.Nv.calredevelop.org "x0018 1TEM..� • Co*s,- CITY OF A )ORPARK, CALIF Redevel 3 -it Agency Meg fat sr. NOMMONNOWN -A- MOORPARK REDEVELOPMENT AGENCY AGENDA REPORT To: Honorable Agency Board of Directors From: David C. Moe II, Redevelopment Manager Date: March 6, 2009 (Agency Meeting of 3/18/09) Subject: Consider Granting Sidewalk Easements to the City of Moorpark on Agency Owned Property Located at 10633 10739 1095, 11139 11239 1293, and 1331 Walnut Canyon BACKGROUND &DISCUSSION Tract No. 5130 is a 110 -home Residential Planned Development (RPD 1998 -02) located along the east side of Walnut Canyon Road, north of Casey Road and Wicks Road, and southwest of Spring Road as shown on Attachment 1. As a requirement of the Conditions of Approval per City Council Resolution No. 2003- 2150, the site improvements for Tract No. 5130 (RPD 1998 -02) include dedications for fee parcel right -of -way, and storm drain and sidewalk easements, as applicable on individual documents to the City of Moorpark ( "City"). The easements and fee parcels will be maintained by the City. The Redevelopment Agency of the City of Moorpark ( "Agency") has purchased the properties located at 1063, 1073, 1095, 1113, 1123, 1293 and 1331 Walnut Canyon for affordable housing purposes. These properties have been identified in the Conditions of Approval as requiring five -foot easements along the frontage for the construction of a sidewalk. Granting the easements to the City will improve the Walnut Canyon neighborhood and further the goals of the Moorpark Redevelopment Plan. FISCAL. IMPACT None. STAFF. RECOMMENDATION Approve granting sidewalk easements to the City of Moorpark and authorize Executive Director to execute any documents needed to affect this transaction. Attachment I: RPD 1998 -02 vicinity map ,t.10019 ATTACHMENT 9 0 z 0 r z U TRACT 5'30.., PROJECT SITE C9�eF�T� CASEY S0� o Rc v+�u� pR�t��PVE• R.R. R� HIGH sr R O 10S ANGELES AVE � . . . . .............. 118 Q PR N MOORPARK VICINITY MAP NTs TRACT N0. 5130 ��:� �: �� ITEM CITY OF It )QRPARK, CAUFr Redeval ' -it Agency Met _ •�- /� -o30og B1a MOORPARK REDEVELOPMENT AGENCY AGENDA REPORT T0: Honorable Chair and Agency Board Members FROM: Yugal K. Lall, City Engineer /Public Works Directo � DATE: March 5, 2009 (Agency Meeting of 03/18/09) SUBJECT: Consider Award of Contract for the Walnut Canyon Storm Drain Improvements/West High Street Rehabilitation &Parking Lot Project (Project 5052) and Resolution Amending the Fiscal Year 2008/09 Budget to Appropriate Funds for the Project DISCUSSION A. Background The Redevelopment Agency of the City of Moorpark ( "Agency ") has negotiated a 99- year lease with the United States Post Office ( "Post Office ") for the construction and operation of a new downtown post office building at the terminus of West High Street. The Agency has partnered with the Post Office to assist with the design and construction of street, parking lot and drainage improvements ( "Public Improvements ") necessary for the new post office building. On December 17, 2008, the Agency approved the Public Improvement plans and authorized staff to advertise for sealed bids for the Walnut Canyon Storm Drain Improvements/West High Street Rehabilitation & Parking Lot. At the same meeting, the Agency authorized staff to advertise for sealed bids for the manufacture and delivery of the storm drain pipes necessary for this project. On February 4, 2009, the Agency awarded a $202,415.00 contract to Rialto Concrete Products, Inc. for the manufacture and delivery of storm drain pipes. A $25,000 contingency and $10,000 for inspection was also approved at the same time. The pipes are currently being manufactured and tested. Delivery of the pipes will be coordinated with the construction of the Walnut Canyon Storm Drain Improvements/West High Street Rehabilitation &Parking Lot project. .sd)021 SAPublic Works \Everyone \Reports \Staff Reports\2009 \March \Wa1nut Cyn SD Impv - Award.doc Honorable Agency Board of Directors March 18, 2009 Page 2 B. Proiect Scope The proposed improvements consist of removal and disposal of approximately 550 linear feet of existing reinforced concrete open channel, construction of approximately 400 linear feet of 96" reinforced concrete pipe (RCP), 150 linear feet of 72" RCP, 230 linear feet of 6' x 3.5' reinforced concrete box, and related excavation, grading and backfill. Additional work includes removal and reconstruction of 300 linear feet of 18" sewer main, construction of curb, gutter and driveways, full street cold milling, placement of approximately 920 tons of conventional asphalt pavement, signing, striping, parking lot construction, landscaping, irrigation and fencing. C. Bid Results /Analysis Eighty -four prospective bidders purchased the plans and specifications. Of that number, 17 bids were received and opened on March 5, 2009. The low bidder is Toro Enterprises, of Oxnard, California. The low bidder possesses the necessary qualifications and experience to perform the work and additionally, is a responsible bidder. The low bidder has also worked previously on City's projects and has completed the projects per the project plans, specifications, time frame and budget. There was one minor irregularity in the low bid in that there was only one signature on the bid bond, the signing requirements required two signatures; however, the bond is good with one signature. The Agency Board has the authority to waive a minor irregularity. The bid results are as follows: No. Bidder Amount 1 Toro Enterprises, Oxnard, CA $1,153,058.50 2 RCC, Montrose, CA $19244,253.74 3 Excel Paving Co., Long Beach, CA $1,355,051.00 4 Sukut Construction, Van Nuys, CA $1,409,350.00 5 Los Angeles Engineering, Covina, CA $114691501.50_ 6 V. Lopez & Sons, Santa Maria, CA $11486,772.25 7 SRD Construction, Anaheim $1,490,593.00 8 Berry General, Ventura, CA $1,565,893.00 9 Mendez Concrete, Santa Paula, CA $1,586,004.75 10 Whitaker Contractors, Paso Robles, CA $1,636,466.50 11 Cedro Construction, Santa Paula, CA $1,683,314.75_ 12 MJS Construction, Inc., Palmdale, CA $1,767,492.00 13 Teichert Construction, Sacramento, CA $1,797,004.10 14 Lash Construction, Santa Barbara, CA $1,818,741.50 15 Paulus Engineering, Anaheim, CA $1,846,878.20 SAPublic Works \Everyone \Reports \Staff Reports \2009 \March \Walnut Cyn SD Imp- Award.doc � ,1 0 02 2 Honorable Agency Board of Directors March 18, 2009 Page 3 16 Union Engineering Co., Ventura, CA $1,907,933.00 17 Blois Construction, Oxnard, CA $2,775,459.00 The detailed analysis of bids is contained in Attachment 2. The Engineer's estimate is $1,578,750.50. D. Project Schedule and Administration Construction is anticipated to commence by mid - April, 2009. Construction administration will be performed by in -house Public Works staff and consultants will be hired to perform the construction survey, inspection, geotechnical observation and testing. Staff is proposing a budget of $115,000.00 (10% of construction contract) for contingencies during construction if the need arises. Staff has received 3 proposals from consultants to provide project inspection, geotechnical observation and testing, and recommends that the Agency enter into an agreement with RJR Engineering Group (RJR) for these services at a cost not -to- exceed $55,000. The previously approved $10,000 budget for inspection of the pipe manufacturing has not been spent so it will be applied to the $55,000 cost for construction inspection and testing. Staff is soliciting proposals from consultants to perform the construction survey and recommends the Agency authorize a consultant agreement for said services at a not- to- exceed cost of $20,000. The Agency is also required to pay the Ventura County Watershed Protection District (VCWPD) for inspection services of the storm drain improvements. Staff is proposing a budget of $15,000 for VCWPD inspection services. FISCAL IMPACT 1. Project Cost Estimate: The current project cost estimate is as follows: Description Estimated Cost Design $ 1409460 Permits $ 29000 Pipe Manufacturing & Delivery $ 227,415 Construction $ 11153,059 10% Contingency on Construction $ 115,000 Survey, Inspection & Testing $ 909000 Total $ 177279934 SAPublic Works \Everyone \Reports \Staff Reports\2009 \March \Wa1nut Cyn SD Imp- Award.doc % W23 Honorable Agency Board of Directors March 18, 2009 Page 4 2. Funding: The proposed project funding is as follows: Total $ 3799875 $ 193489059 $ 107279934 STAFF RECOMMENDATIONS (ROLL CALL VOTE) 1. Waive a minor irregularity addressed in agenda report and award a contract to Toro Enterprises, and authorize the MRA Executive Director to execute the construction contract in the amount of $1,153,058.50 for the subject project. 2. Authorize the MRA Executive Director to amend the construction contract for project contingencies in an amount not -to- exceed $115,000 if and when the need arises for extra work and services. 3. Authorize the MRA Executive Director to sign a consultant agreement with RJR Engineering Group for inspection, geotechnical observation and testing services in an amount not -to- exceed $55,000. 4. Authorize the MRA Executive Director to sign a consultant agreement for survey services in an amount not -to- exceed $20,000. 5. Adopt Resolution No. 2009 - amending the Fiscal Year 2008/09 Budget to fund Project 5052. Attachments: 1 Resolution 2 Bid Analysis SAPublic Works \Everyone \Reports \Staff Reports\2009 \March \Wa1nut Cyn SD Impv - Award.doc '.10 0 2 4 Budget Account No. Current Budget Amendment Total Project 2904.2410.5052.9601 - Design & Permits $ 142,460 $ - $ 1429460 2904.2410.5052.9640 - Pipe Mfg. & Del. $ 2279415 $ - $ 227,415 2904.2410.5052.9640 - Construction $ - $ 11153,059 $ 11153,059 2904.2410.5052.9640 - 10% Contingency $ - $ 1159000 $ 1152000 2904.2410.5052.9650 - Inspection, Survey, etc. $ 109000 $ 80,000 $ 909000 Total $ 3799875 $ 193489059 $ 107279934 STAFF RECOMMENDATIONS (ROLL CALL VOTE) 1. Waive a minor irregularity addressed in agenda report and award a contract to Toro Enterprises, and authorize the MRA Executive Director to execute the construction contract in the amount of $1,153,058.50 for the subject project. 2. Authorize the MRA Executive Director to amend the construction contract for project contingencies in an amount not -to- exceed $115,000 if and when the need arises for extra work and services. 3. Authorize the MRA Executive Director to sign a consultant agreement with RJR Engineering Group for inspection, geotechnical observation and testing services in an amount not -to- exceed $55,000. 4. Authorize the MRA Executive Director to sign a consultant agreement for survey services in an amount not -to- exceed $20,000. 5. Adopt Resolution No. 2009 - amending the Fiscal Year 2008/09 Budget to fund Project 5052. Attachments: 1 Resolution 2 Bid Analysis SAPublic Works \Everyone \Reports \Staff Reports\2009 \March \Wa1nut Cyn SD Impv - Award.doc '.10 0 2 4 Attachment 1 RESOLUTION NO. 2009 - A RESOLUTION OF THE REDEVELOPMENT AGENCY OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR 2008/09 BUDGET TO APPROPRIATE FUNDS FOR PROJECT 5052: WALNUT CANYON STORM DRAIN IMPROVEMENTS /HIGH STREET REHABILITATION & PARKING LOT FROM MRA 2001 TAX ALLOCATION BOND PROCEEDS FUND (2904) WHEREAS, on July 2, 2008, the Board of Directors adopted the Agency budget for Fiscal Year 2008/09; and WHEREAS, a staff report has been presented to the City Council requesting a budget adjustment in the aggregate amount of $1,348,059.00; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impact to the budget line item. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate increase of $1,348,059.00 as more particularly described in Exhibit "A ", is hereby approved. SECTION 2.The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 18th day of March, 2009. Janice S. Parvin, Mayor ATTEST: Deborah S. Traffenstedt, City Clerk Attachment: Exhibit 'A': Appropriation and Budget Detail SAPublic Works \Everyone \Reports \Staff Reports \2009 \March \Wa1nut Cyn SD Impv Reso.doc Resolution No. 2009 - EXHIBIT "A" BUDGET AMENDMENT FOR MRA 2001 TAX ALLOCATION BOND PROCEEDS FUND (2904) TO FUND PROJECT 5052: WALNUT CANYON STORM DRAIN IMPROVEMENTS/ HIGH STREET REHABILITATION &PARKING LOT FY 2008 -2009 FUND ALLOCATION FROM: Fund Account Number Amount MRA 2001 TAB Proceeds 2904 -5500 $ 1, 348, 059.00 $ 1,268,059.00 $ 19495,474.00 2904.2410.5052.9650 Inspection $ 10,000.00 $ 80,000.00 $ 90,000.00 Total $ 113481059.00 DISTRIBUTION OF APPROPRIATION TO EXPENSE ACCOUNTS: Account Number Current Budget Revision Amended Budget 2904.2410.5052.9640 Construction $ 2271415.00 $ 1,268,059.00 $ 19495,474.00 2904.2410.5052.9650 Inspection $ 10,000.00 $ 80,000.00 $ 90,000.00 Total $ 237,415.00 $ 11348,059.00 $ 1,585,474.00 Finance Approval: SAPublic Works \Everyone \Reports \Staff Reports \2009 \March \Wanut Cyn SD Impry Funding Exhibit A.As 4 N Attachment 2 6ninnt Canvnn Stnrm Drain Imnrnvements/West Hiah Street Rehabilitation & Parkina Lot Owner: City of Moorpark Bid Opening: 03/05/09 * marks an allowance Engineer's Estimate Bid Schedule Item # I Item Code Item Description Qua nti Unit of Measure Unit Price Item Total 1 CALTRANS PERMIT 1 LS $492.00 $492.00 2 TRAFFIC CONTROL 1 LS $5,000.00 $5,000.00 3 CLEARING, GRUBBING & REMOVALS 1 LS $200,000.00 $200,000.00 4 DIVERSION & CONTROL OF WATER 1 LS $75,000.00 $75,000.00 5 STORM WATER POLLUTION 1 LS $45,000.00 $45,000.00 6 SHORING & WORKER SAFETY 1 LS $45,000.00 $45,000.00 7 COMPLETE INSTALLATION - 96" RCP 396 LF $350.00 $138,600.00 8 COMPLETE INSTALLATION - 72" RCP 152 LF $300.00 $45,600.00 9 COMPLETE INSTALLATION - 60" RCP 48 LF $250.00 $12,000.00 10 COMPLETE INSTALLATION - 24" RCP 2.5 LF $200.001 $500.00 11 COMPLETE INSTALLATION - 18" RCP 7 LF $125.00 $875.00 12 COMPLETE INSTALLATION - 3.5'X 6' RCB 230 LF $200.00 $46,000.00 13 COMPLETE INSTALLATION - 8'X 5' RCB 10 LF $750.00 $7,500.00 14 COMPLETE INSTALLATION - 6'X 5' RCB 10 LF $500.00 $5,000.00 15 ITEM DELETED 27 LF $0.00 $0.00 16 ITEM DELETED 1 EA $0.00 $0.00 17 TRANSITION STRUCTURE - 79" TO 72" - 22.75 LF $650.00 $14,787.50 18 A TRANSITION STRUCTURE - 6' X 5' 72" 40 LF $800.00 $32,000.00 0.18 B ITEM DELETED 20 LF $0.00 $0.00 19 TRANSITION STRUCTURE - 96" TO 8'X 5' 40 LF $800.00 $32,000.00 20 TRANSITION STRUCTURE - 60" RCP TO 40 LF $600.00 $24,000.00 21 JUNCTION STRUCTURE - APWA 322 -1 53 LF $500.00 $26,500.00 22 ITEM DELETED 182 LF $0.00 $0.00 23 CUT OFF WALL SEE MP DRAIN #1 1 LS $800.00 $800.00 24 CHAIN LINK FENCE TRANSITION 50 LF $100.00 $5,000.00 25 STORM DRAIN MANHOLES 2 EA $900.00 $1,800.00 26 CATCH BASIN - 5'- APWA 300 -2 1 EA $2,500.00 $2,500.00 27 CATCH BASIN - 21'- APWA 300 -2 1 EA $8,000.00 $8,000.00 28 A CATCH BASIN - 3.5'- APWA 300 -2 4 EA $2,000.00 $8, 000.00 0.29 B COMPLETE INSTALLATION OF 8" SDR 135 LF $50.00 $6,750.00 29 EARTHWORK 1 LS $150,000.00 $150,000.00 30 COMPLETE INSTALLATION OF 18" DIA. 202 LF $125.00 $25,250.00 31 COMPLETE INSTALLATION OF 18" DIA. 96 LF $150.00 $14,400.00 32 WATER SERVICE ABANDONMENT 1 EA $700.00 $700.00 33 SEWER LATERALS 1 LS $1,500.00 $1,500.00 34 A WATER SERVICES 2 EA $900.00 $1,800.00 0.36 B FIRE HYDRANT COMPLETE IN PLACE 1 EA $1,500.00 $1,500.00 35 COMPLETE INSTALLATION OF 1-4" PVC 580 LF $40.00 $23,200.00 36 COMPLETE INSTALLATION OF 1 -3" PVC 415 LF $30.00 $12,450.00 37 COMPLETE INSTALLATION OF 1 -1 1/211 480 LF $20.001 $9,600.00 38 STREET LIGHT PULL BOXES 9 EA $50.00 $450.00 39 6" PCC CURB & GUTTER 1460 LF $20.00 $29,200.00 40 6" PCC CURB 1550 LF $10.00 $15,500.00 41 PCC DRIVEWAY 1250 SF $12.00 $15,000.00 42 CURB RAMP 6 EA $800.00 $4,800.00 43 PCC SIDEWALK 4" THICK 3000 SF $5.00 $15,000.00 44 ITEM DELETED 125 LF $0.00 $0.00 45 6" ASPHALT CONCRETE CURB 450 LF $10.00 $4,500.00 46 PAVEMENT MILLING - VARIABLE 5000 SF $2.25 $11,250.00 47 AGGREGATE BASE / CMB 2700 TN $25.00 $67,500.00 48 ASPHALT CONCRETE 1100 TN $115.00 $126,500.00 49 A ADJUST STORM DRAIN /SEWER 4 EA $400.00 $1,600.00 0.52 B ADJUST WATER VALVES TO GRADE 4 EA $300.00 $1,200.00 50 REPLACE LOOP DETECTORS 4 EA $200.00 $800.00 51 NO STOPPING ANYTIME SIGNS 15 EA $100.00 $1,500.00 52 STOP SIGNS 2 EA $100.00 $200.00 53 RIGHT TURN ONLY SIGNS 2 EA $100.00 $200.00 54 ONE WAY SIGNS 2 EA $100.00 $200.00 . � 00 i 551 DISABLED PARKING SIGNS 2 EA $100.00 $200.00 56 STREET CENTERLINE STRIPE 630 LF $2.00 $1,260.00 57 RIGHT HAND TURN ARROWS 2 EA $50.00 $100.00 58 12" LIMIT LINE 100 LF $3.60 $360.00 59 "STOP" LEGEND 3 EA $50.00 $150.00 60 BIKE LANE 350 LF $3.00 $1,050.00 61 PARKING LOT STRIPING 1400 LF $1.50 $2,100.00 62 DISABLED PARKING STALLS STRIPING 2 EA $100.00 $200.00 63 PARKING LOT LIGHTING 1 LS $25,000.00 $25,000.00 64 IRRIGATION SYSTEM IMPROVEMENTS 1 LS $25,000.00 $25,000.00 65 LANDSCAPE PLANTING IMPROVEMENTS 1 LS $75,000.00 $75,000.00 66 LANDSCAPE & IRRIGATION SYSTEM 12 MTH $500.00 $6,000.00 67 15' ACCESS GATE CHAIN LINK 1 EA $1,500.00 $1,500.00 681 CHAIN LINK FENCE PERIMETER 340 LF $30.00 $10,200.00 69 WROUGHT IRON FENCE W /BRICK 85 LF $75.00 $6,375.00 70 WROUGHT IRON FENCE W /BRICK 470 LF $125.00 $58,750.00 71 SEWER MANHOLE 2 EA $8,000.00 $16,000.00 72 MAINTENANCE OF EXISTING SEWER 1 LS $25,000.00 $25,000.00 73 RELEASE ON CONTRACT 1 EA $1.00 $1.00 Bid List Total $1 p5789750.50 Total Bid Amount $1,5789750.50 Listed Subs 2 8 TORO ENTERPRISES RCC Excel Paving Company 511 BUENA VISTA AVE. Ventura, CA 93030 US Bidder Status: Valid 3823 Oceanview Blvd Montrose, CA 91020 US Bidder Status: Valid 2230 Lemon Avenue Long Beach, CA 90806 US Bidder Status: Valid Unit Price Item Total Unit Price Item Total Unit Price Item Total $492.00 $492.00 $492.00 $492.00 $492.00 $492.00 $25,000.00 $25,000.00 $1,687.77 $1,687. 7 $32,000.00 $32,000.00 $43,000.00 $43,000.00 $76,576.67 $76,576.67 $95,307.00 $95,307.00 $6,500.00 $6,500.00 $4,250.00 $4,250.00 $28,752.00 $28,752.00 $5,100.00 $5,100.00 $10,600.00 $10,600.00 $20,000.00 $20,000.00 $5,500-00 $5,500-00 $5,300.00 $5,300.00 $5,892.00 $5,892.00 $270.00 $106,920.00 $382.00 $151,272.00 $182.00 $72,072.00 $215.00 $32,680.00 $290.00 $44,080.00 $175.00 $26,600.00 $175.00 $8,400.00 $470.00 $22,560.00 $150.00 $7,200.00 $100.00 $250.00 $106.00 $265.00 $231.00 $577.50 $100.00 $700.00 $80.00 $560.00 $153.00 $1,071.00 $125.00 $28,750.00 $186.00 $42,780.00 $174.00 $40,020.00 $1,150.00 $11,500-00 $700.00 $7, 000.00 $1,200.00 $12,000.00 $1,000.00 $10,000.00 $620.00 $6,200.00 $1,200.00 $12,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $800.00 $18,200.00 $700.00 $15,925-00 $800.00 $18,200.00 $790.00 $31,600.00 $700.00 $28,000.00 $750.00 $30,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $700.00 $28,000.00 $800.00 $32,000.00 $725.00 $29,000.00 $530.00 $21,200.00 $700.00 $28,000.00 $525.00 $21,000.00 $575.00 $30,475.00 $700.00 $37,100.00 $850.00 $45,050.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,500.00 $2,500.00 $7,200.00 $7,200.00 $2,000.00 $2,000.00 $63.00 $3,150.00 $23.00 $1,150.00 $46.00 $2,300.00 $2,800.00 $5,600.00 $4,150.00 $8,300.00 $8, 500.00 $17,000.00 $4,500.00 $4,500-00 $5,100.00 $5,100.00 $6,750-00 $6,750.00 $11,000.00 $11,000.00 $7,400.00 $7,400.00 $18,000.00 $18,000.00 $2,600.00 $10,400.00 $2,770.00 $11,080.00 $4,500.00 $18,000.00 $31.00 $4,185.00 $22.06 $2,978.10 $28.00 $3,780.00 $76,000.00 $76,000.00 $36,000.00 $36,000.00 $80,000.00 $80,000.00 $86.00 $17,372.00 $123.00 $24,846.00 $246.00 $49,692.00 $165.00 $15,840.00 $120.00 $11,520.00 $328.00 $31,488.00 $975.00 $975.00 $5,300.00 $5,300.00 $1,185.00 $1,185.00 $4,250.00 $4,250.00 $5,300.00 $5,300.00 $8,030.00 $8,030.00 $3,400.00 $6,800.00 $5,300.00 $10,600.00 $16,314.00 $32,628.00 $9,500.00 $9,500.00 $6,900.00 $6,900-00 $5,094.00 $5,094.00 $14.00 $8,120.00 $13.60 $7,888.00 $13.00 $7,540.00 $5.00 $2,075.00 $5.10 $2,116.50 $5.00 $2,075.00 $2.65 $1,272.00 $2.63 $1,262.40 $2.50 $1,200.00 $645.00 $5,805.00 $640.00 $5,760.00 $650.00 $5,850.00 $13.50 $19,710.00 $24.50 $35,770.00 $22.00 $32,120.00 $9.00 $13,950-00 $20.20 $31,310.00 $15.00 $23,250-00 $5.00 $6,250.00 $5.30 $6,625-00 $6.00 $7,500.00 $1,500-00 $9,000.00 $1,700.00 $10,200.00 $1,300.00 $7,800.00 $4.00 $12,000.00 $5.30 $15,900.00 $4.00 $12,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7.00 $3,150.00 $15.00 $6,750.00 $8.00 $3,600.00 $1.00 $5,000.00 $0.96 $4,800.00 $0.84 $4,200.00 $13.50 $36,450.00 $27.00 $72,900.00 $15.00 $40,500.00 $75.00 $82,500.00 $77.00 $84,700.00 $64.00 $70,400.00 $800.00 $3,200.00 $530.00 $2,120.00 $650.00 $2,600.00 $300.00 $1,200.00 $266.00 $1,064.00 $350.00 $19400.00 $285.00 $19140.00 $283.00 $1,132.00 $266.00 $1,064.00 $158.00 $29370.00 $150.00 $2,250.00 $150.00 $2,250.00 $168.00 $336.00 $160.00 $320.00 $160.00 $320.00 $158.00 $316.00 $160.001 $320.00 $150.00 $300.00 $158.00 $316.001 $160.001 $320.00 $150.00 $300.00 �, 2 9 $158.00 $316.00 $154.00 $308.00 $150.00 $300.00 $0.25 $157.50 $1.32 $831.60 $0.20 $126.00 $37.00 $74.00 $26.60 $53.20 $35.00 $70.00 $0.85 $85.00 $0.90 $90.00 $0.80 $80.00 $70.00 $210.00 $53.00 $159.00 $65.00 $195.00 $0.26 1 $91.00 $0.19 $66.50 $0.25 $87.50 $0.50 $700.00 $0.27 $378.00 $0.45 $630.00 $100.00 $200.00 $53.00 $106.00 $95.00 $190.00 $43,000.00 $43,000.00 $43,000.00 $43,000.00 $48,000.00 $48,000.00 $37,000.00 $37,000.00 $37,500.00 $37,500.00 $35,300.00 $35,300.00 $18,200.00 $18,200.00 $18,400.00 $18,400.00 $171400.00 $17,400.00 $785.00 $9,420.00 $800.00 $9,600.00 $750.00 $9,000.00 $2,135.00 $2,135.00 $3,160.00 $3,160.00 $2,030.00 $2,030.00 $36.00 $12,240.00 $23.00 $7,820.00 $27.00 $9,180.00 $268.00 $22,780.00 $170.00 $14,450.00 $220.00 $18,700.00 $365.00 $171,550-00 $290.00 $136,300.00 $410.00 1 $192,700.00 $4,700.00 $9,400.00 $5,800.00 $11,600-00 $4,846.00 $9,692.00 $25,000.00 $25,000-00 $8,600.00 $8, 600.00 $11,920.00 $11,920.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1 p 153,058. 50 $1,244,253.74 $1,355,051.00 $1,153,058.501 1 1 $19244,253.74 $19355,051.00 American Landscape, Inc 7949 Deering Ave Canoga Park, CA 91913 License No: 288229 C -27 Landscape C &W Construction Specialties, Inc. 2419 Palma Drive Ventura, CA 93003 License No: 256795 A Install Fence Glasspoole Masonary 6645 Albatrose Avenue Ventura, CA 93003 License No: 923380 C -29 CMU Walls & Pier Taft Electric 1694 Eastman Ave Ventura, CA 93003 License No: 772245 C -10 Electrical . J04430 Sukut Construction Inc. LOS ANGELES ENGINEERING INC V. Lopez Jr. & Sons 5805 Sepulveda Blvd., Suite #690 Van Nuys, CA 91411 Bidder Status: Valid 633 N BARRANCA AVENUE COVINA, CA 91723 Bidder Status: Valid 200 E Fesler St Suite 101 Santa Maria, CA 93454 US Bidder Status: Valid Unit Price Item Total Unit Price Item Total Unit Price Item Total $ 492.00 $ 492.00 $492.00 $492.00 $492.00 $492.00 $12,000.00 $12,000.00 $1,600.00 $1,600.00 $31,328.00 $31,328.00 $130,000.00 $130,000.00 $95,400.00 $95,400.00 $64,884.00 $64,884.001 $10,000.00 $10,000.00 $500.00 $500.00 $25,000.00 $25,000.00 $17,000.00 $17,000.00 $2,000.00 $2,000.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00 $100.00 $100.00 $8,000.00 $8, 000.00 $308.00 $121,968.00 $395.00 $156,420.00 $481.00 $190,476.00 $262.00 $39,824.00 $260.00 $39,520.00 $374.00 $56,848.00 $76.00 $3,648.00 $140.00 $6,720.00 $401.00 $19,248.00 $310.00 $775.00 $275.00 $687.50 $318.00 $795.00 $112.00 $784.00 $210.00 $1,470.00 $224.00 $1,568.00 $74.00 $17,020.00 $160.00 $36,800.00 $133.00 $30,590.00 $780.00 $7,800.00 $1,000.00 $10,000.00 $774.00 $7,740.00 $697.00 $6,970.00 $1,000.00 $10,000.00 $639.00 $6,390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,180.00 $26,845.00 $720.00 $16,380.00 $673.00 $15,310.75 $770.00 $30,800.00 $820.00 $32,800.00 $703.00 $28,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,022.00 $40,880.00 $980.00 $39,200.00 $787.00 $31,480.00 $560.00 $22,400.00 $620.00 $24,800.00 $693.00 $27,720.00 $1,520.00 $80,560.00 $850.00 $45,050.00 $694.00 $36,782.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $908.00 $908.00 $2,200.00 $2,200.00 $8,016.00 $8,016.00 $46.00 $2,300.00 $30.00 $1,500.00 $26.25 $1,312.50 $2,600.00 $5,200.00 $5,300.00 $10,600 " 00 $9,272.00 $18,544.00 $4,700.00 $4,700.00 $4,600.00 $4,600.00 $6,340.00 $6,340.00 $11,550.00 $11,550.00 $13, 000.00 $13, 000.00 $9,525.00 $9,525.00 $4,800.00 $19,200.00 $5,500.00 $22,000.00 $3,304.00 $13,216.00 $30.00 $4,050.00 $38.00 $5,130.00 $179.00 $24,165.00 $125,000.00 $125,000.00 $139,000.00 $139,000.00 $48,862.00 $48,862.00 $98.00 $19,796.00 $320.00 $64,640.00 $289.00 $58,378.00 $191.00 $18,336.00 $360.00 $34,560.00 $383.00 $36,768.00 $1,415.00 $1,415.00 $500.00 $500.00 $425.00 $425.00 $4,500.00 $4,500.00 $2,000.00 $2,000.00 $1,070.00 $1,070.00 $6,500.00 $13,000.00 $5,000-00 $10,000.00 $1,548.00 $3,096.00 $5,500.00 $5,500.00 $71800-00 $7,800.00 $9,047.00 $9,047.00 $13.00 $7,540.00 $13.00 $7,540.00 $16.35 $9,483.00 $5.20 $2,158.00 $5.00 $2,075.00 $5.10 $2,116.50 $2.50 $1,200.00 $2.70 $1,296.00 $2.60 $1,248. 00 $650.00 $5,850.00 $700.00 $6,300.00 $634.00 $5,706.00 $23.00 $33,580.00 $22.00 $32,120.00 $26.15 $38,179.00 $12.30 $19, 065.00 $12.00 $18,600.00 $22.00 $34,100.00 $7.00 $8,750.00 $7.00 $8,750.00 $6.25 $7,812-50 $1,125.00 $6,750-00 $2,000.00 $12,000.00 $2,180.00 $13,080.00 $5.00 $15,000.00 $6.001 $18,000.00 $6.25 $18,750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.00 $4,050.00 1 $9.00 $4,050.00 $7.35 $3,307.50 $1.00 $5,000.00 $0.80 $4,000.00 $1.06 $5,300.00 $24.00 $64,800.00 $23.00 $62,100.00 $16.85 $45,495.00 $85.00 $93,500.00 $94.00 $103,400.00 $79.36 $87,296.00 $400.00 $1,600.00 $550.00 $2, 200.00 $750.00 $3,000.00 $300.00 $1,200.00 $230.00 $920.00 $650.00 $2,600.00 $290.00 $1,160.00 $300.00 $1,200.00 $280.00 $1,120.00 $165.00 $2,475.00 $225.00 $3,375.00 $157.50 $2,362.50 $175.00 $350.00 $225.00 $450.00 $168.00 $336.00 $165.00 $330.00 $225.00 $450.00 $157.50 $315.00 $165.00 $330.00 $225.00 $450.00 $157.r'01 $315.00 $165.00 $330.00 $225.00 $450.00 $157.50 $315.00 $0.20 $126.00 $0.50 $315.00 $0.25 $157.50 $39.00 $78.00 $40.00 $80.00 $37.00 $74.00 $1.00 $100.00 $1.50 $150.00 $0.84 $84.00 $72.00 $216.00 $65.00 $195.00 $68.00 $204.00 $0.30 $105.00 $0.70 $245.00 $0.27 $94.50 $0.50 $700.00 $0.50 $700.00 $0.47 $658.00 $100.00 $200.00 $70.00 $140.00 $100.00 $200.00 $42,000.00 $42,000.00 $42,000.00 $42,000.001 $43,291.00 .$43,291.00 $40,000.00 $40,000.00 $27,000.00 $27,000.00 $37,016.00 $37,016.00 $18,000.00 $18,000.00 $45,000.00 $45,000.00 $18,183.00 $18,183.00 $770.00 $9,240.00 $1,500.00 $18,000.00 $787.00 $9,444.00 $2,100.00 $2,100.00 $510.00 $510.00 $525.00 $525.00 $28.00 $9, 520.00 $23.00 $7,820.00 $24.00 $8,160.00 $225.00 $19,125.00 $210.00 $17,850.00 $173.00 $14,705.00 $350.00 $164,500.00 $290.00 $136,300.00 $390.00 $183,300.00 $5,300.00 $10,600.00 $5,500.00 $11,000.00 $9,764.00 $19,528.00 $10,000.00 $10,000.00 $35,000.00 $35,000.00 $45,874.00 $45,874.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1,409,350.00 $1,4699501.50 $1,486Y 772.25 $194099350.00 1 $194699501.50 $1,486,772.25 �pd1(,s32 SRD Construction Berry General Engineering Contractors, Inc. Mendez Concrete Inc. 3578 East Enterprise Dr Anaheim, CA 92807 us Bidder Status: Valid P O Box 1457 Ventura, CA 93002 us Bidder Status: Valid 1210 E. Santa Paula St. Santa Paula, CA 93060 Bidder Status: Valid Unit Price Item Total Unit Price Item Total Unit Price Item Total $492.00 $492.00 $492.00 $492.00 $492.00 $492.00 $23,000.00 $23,000.00 $4,851.00 $4,851.00 $9,316.00 $9,316.00 $150,000.00 $150,000.00 $51,225.00 $51,225.00 $90,499.00 $90,499.00 $24,200.00 $24,200.00 $5,200.00 $5,200.00 $24,732.00 $24,732.00 $16,400.00 $16,400.00 $15,455.00 $15,455.00 $15,287.00 $15,287.00 $6,000.00 $6,000.00 $5,200.00 $5,200.00 $27,974.00 $27,974.00 $176.00 $69,696.00 $624.00 $247,104.00 $232.70 $92,149.20 $146.00 $22,192.00 $447.00 $67,944.00 $218.10 $33,151-20 $203.00 $9, 744.00 $260.00 $12,480.00 $61.80 $2,966.40 $800.00 $2,000-00 $208.00 $520.00 $58.00 $145.00 $292.00 $2,044.00 $208.00 $1,456.00 $43.60 $305.20 $190.00 $43,700.00 $270.00 1 $62,100.00 $65.40 $15,042.00 $920.00 $9,200.00 $1,248.00 $12,480.00 $884.20 $8,842.00 $900.00 $9,000.00 $1,040.00 $10,400.00 $806.80 $8,068.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $540.00 $12,285.00 $1,248.00 $28,392.00 $1,759-00 $40,017.251 $515.00 $20,600.00 $1,040.00 $41,600.00 $955.70 $38,228.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $590.00 $23,600.00 $1,040.00 $41,600.00 $1,075.70 $43,028.00 $450.00 $18, 000.00 $1,040.00 $41,600.00 $755.80 $30,232.00 $836.00 $44,308.00 $1,040.00 $55,120.00 $1,558.00 $82,574.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,050.00 $2,050.00. $41160.00 $4,160.00 $868.00 $868.00 $40.00 $2,000.00 $35.40 $1,770.00 $39.50 $1,975.00 $21400.00 $4,800.00 $2,600.00 $5,200.00 $818.00 $1,636.00 $3,670.00 $3,670.00 $6,760.00 $6,760.00 $7,479.00 $7,479.00 $9,700.00 $9,700.00 $9,360.00 $9,360.00 $14, 959.00 $14,959.00 $3,800.00 $15,200.00 $5,720.00 $22,880.00 $1,168.80 $4,675.20 $35.00 $4,725.00 $26.00 $3,510.00 $42.10 $5,683.50 $136,000.00 $1369000.00 $126,405.00 $126,405.00 $189,859.00 $189,859.00 $334.00 $67,468.00 $166.00 $33,532.00 $139.20 $28,118.40 $330.00 $31,680.00 $182.00 $17,472.00 $316.30 $30,364.80 $2,200.00 $29200.00 $2,080.00 $2,080.00 $2,214.00 $2,214.00 $3,840.00 $31840.00 $3,640.00 $3,640.00 $13,917.00 $13,917.00 $71200-00 $141400.00 $6,240.00 $12,480.00 $10,626.50 $21,253.00 $6,000.00 $6,000.00 $15,600-00 $15, 600.00 $14,169.00 $14,169.00 $13.70 $7,946.00 $13.30 $7,714.00 $14.10 $8,178.00 $14.00 $5,810.00 $5.00 $2,075.00 $5.30 $2,199.50 $6.30 $3,024.00 $2.60 $1,248.00 $2.70 $1,296.00 $470.00 $4,230.00 $627.00 $5,643.00 $710.70 $6,396.30 $20.00 $29,200.00 $15.80 $23,068.00 $35.90 $52,414.00 $18.00 $27,900.00 $12.80 $19,840.00 $31.40 $48,670.00 $7.00 $8,750.00 $5.90 $7,375.00 $9.00 $11,250.00 $1,000.00 $6,000.00 $1,185.00 $7,110.00 $1,868-80 $11,212.80 $5.00 $15,000-00 $3.801 $11,400.00 $6.70 $20,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $8.00 $3,600.00 $8.50 $3,825.00 $8.00 $3,600.00 $1.00 $5,000-00 $1.05 $5,250.00 $0.90 $4,500.00 $22.00 $59,400.00 $16.20 $43, 740.00 $24.40 $65,880.00 $97.00 $106,700.00 $78.05 $85,855.00 $97.80 $107,580.00 $550.00 $2,200.00 $451.00 $1,804.00 $265.30 $1,061.20 $495.00 $1,980.00 $270.00 $1,080.00 $235.50 $942.00 $635.00 $2,540.00 $277.00 $1,108.00 $292.30 $1,169.20 $164.00 $2,460.00 $156.00 $2,340.00 $164.80 $2,472.00 $174.00 $348.00 $166.00 $332.00 $176.00 $352.00 $164.00 $328.00 $156.00 $312.00 $165.00 $330.00 $164.00 $328.00 1 $156.001 $312.001 $165.001 $330.00 � �� 033 $164.00 $328.00 $156.00 $312.00 $165.00 $330.00 $1.00 $630.00 $0.20 $126.00 $0.20 $126.00 $38.00 $76.00 $37.00 $74.00 $38.50 $77.00 $1.00 $100.00 $0.80 $80.00 $0.90 $90.00 $71.00 $213.00 $68.00 $204.00 $71.30 $213.90 $1.00 $350.00 $0.30 $105.00 $0.30 $105.00 $0.50 $700.00 $0.47 $658.00 $0.50 $700.00 $104.00 $208.00 $99.00 $198.00 $104.50 $209.00 $41,000.00 $41,000.00 $41,850.00 $41,850.00 $43,715-00 $43,715.00 $38,400.00 $38,400.00 $18,010.00 $18,010.00 $38,729.00 $38,729.00 $18,900.00 $18,900.00 $42,612.00 $42,612.00 $19,025.00 $19,025.00 $820.00 $9,840.00 $780.00 $9,360.00 $823.10 $9,877.20 $1,650.00 $1,650-00 $1,435.00 $1,435-00 $2,033.00 $2,033.00 $31.60 $10,744.00 $27.35 $9,299.00 $38.80 $13,192.00 $223.00 $18,955.00 $216.00 $18,360.00 $284.30 $24,165.50 $448.00 $210,560.00 $381.00 $179,070.00 $333.50 $156, 745.00 $4,300.00 $8,600.00 $8,320.00 $16,640.00 $7,366.50 $14,733.00 $26,400.00 $26,400.00 $26,000.00 $26,000.00 $11,786.00 $11,786.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1,490,593.00 $1,565,893.00 $1 586 004.75 $1,4909593.00 $13565,893.00 $1,586,004.75 � i1034 Whitaker Contractors Cedro Construction MJS construction Inc. 2752 Concrete Court Paso Robles, CA 93446 Bidder Status: Valid 120 E Santa Maria St Santa Paula, CA 93060 us Bidder Status: Valid 38348 9th Street East Palmdale, CA 93550 us Bidder Status: Valid Comment: no addendeum submitted Unit Price Item Total Unit Price Item Total Unit Price Item Total $492.00 $492.00 $492.00 $492.00 $492.00 $492.00 $20,000.00 $20,000.00 $17,185.00 $17,185.00 $20,000.00 $20,000.00 $60,000.00 $60,000.00 $120,227.001 $120,227.00 $167,207.00 $167,207.00 $5,000.00 $5,000.00 $53,471.00 $53,471.00 $30,000.00 $30,000.00 $4,300.00 $4,300.00 $28,555.00 $28,555.00 $15,000.00 $15,000.00 $7,000.00 $7,000.00 $63,394.00 $63,,394.00 $20,000.00 $20,000.00 $360.00 $142,560.00 $437.00 $173,052.00 $565.00 $223,740.00 $406.00 $617712.00 413.001 $62,776.00 $400.00 $60,800.00 $365.00 $17,520.00 $308.00 $141784.00 $250.00 $12,000.00 $935.00 $2,337-50 $158.00 $395.00 $500.00 $1,250.00 $445.00 $3,115.00 $105.00 $735.00 $375.00 $2,625.00 $105.00 $24,150.00 $523.00 $120,290.00 $540.00 $124,200.00 $2,050-00 $20,500-00 $1,500.00 $15,000.00 $1,200.00 $12,000.00 $1,875.00 $18,750-00 $1,375.00 $13,750.00 $900.00 $9,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,740.00 $39,585-00 $893.00 $20,315.75 $900.00 $20,475.00 $1,475.00 $59,000.00 $1,075.00 $43,000.00 $810.00 $32,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,570.00 $62,800.00 $1,198.00 $47,920.00 $920.00 $36,800.00 $1,300.00 $52,000.00 $750.00 $30,000.00 $850.00 $34,000.001 $1,600.00 $84,800.00 $1,000.00 $53,000.00 $800.00 $42,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,150.00 $2,150.00 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $45.00 $2,250.00 $45.00 $2,250.00 $27.00 $1,350.00 $4,200.00 $8,400.00 $10,250.00 $20,500.00 $9,500.00 $19,000.00 $7,130.00 $7,130.00 $7,500.00 $7,500.00 $5,800.00 $5,800.00 $1-4,700.00 $14,700.00 $17,700.00 $17,700.00 $8,500.00 $8,500.00 $4,400.00 $17,600.00 $525.00 $2,100.00 $4,500.00 $18,000.00 $36.00 $4,860.00 $125.00 $16,875.00 $45.00 $6,075.00 $100,000.00 $100,000.00 $78,750.00 $78,750 ' 00 $148,000.00 $148,000.00 $130.00 $26,260.00 $158.00 $31,916-00 $145.00 $29,290.00 $210.00 $20,160.00 $184.00 $17,664.00 $280.00 $26,880.00 $925.00 $925.00 $1,575-00 $1,575-00 $1,200.00 $1,200.00 $10,300.00 $10,300.00 $6,825.00 $6,825.00 $2,000.00 $2,000.00 $17,900.00 $35,800.00 $2,525.00 $5,050.00 $2,200.00 $4,400.00 $7,980.00 $7, 980.00 $7,875.00 $7,875.00 $7,500.00 $7,500.00 $14.00 $8,120.00 $15.00 $8,700.00 $14.00 $8,120.00 $5.00 $2,075.00 $6.00 $2,490.00 $5.00 $2,075.00 $2.80 $1,344.00 $4.00 $1,920.00 $3.00 $1,440.00 $600.00 $51400.00 $666.00 $5,-994.00 $650.00 $5,850.00 $28.00 $40,880.00 $29.00 $42,340.00 $20.30 $29,638.00 $19.00 $29,450.00 $11.00 $17,050.00 $16.60 $25,730.00 $10.00 $12,500.00 $11.00 $13,750.00 $7.50 $92 375.00 $1,800.00 $10,800-00 $2,310.001 $13,860.50 $1,400.00 $8, 400.00 $6.30 $18,900.00 $6.001 $18,000.00 $4.50 $13,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.80 $2,610.00 $16.00 $7,200.00 $12.00 $5,400.00 $1.00 $5,000.00 $1.50 $7,500.00 $0.50 $2,500.00 $25.00 $67,500.00 $23.00 $62,100.00 $19.40 $52,380.00 $85.00 $93,500.00 $110.00 $121,000.00 $95.00 $104,500.00 $450.00 $1,800.00 $550.00 $2,200.00 $800.00 $3,200.00 $450.00 $1,800.00 $275.00 $1,100.00 $500.00 $2,000.00 $275.00 $1,100.00 $330.00 $1,320.00 $400.00 $1,600.00 $175.00 $2,625.00 $413.00 $6,195.00 $240.00 $3,600.00 $190.00 $380.00 $413.00 $826.00 $295.00 $590.00 $175.00 $350.00 $413.00 $826.00 $270.00 $540.00 $175-001 $350.0or $413.00 $826.00 $240.00 $480.00 '4)Q35 $175.00 $350.00 $413.00 $826.00 $270.00 $540.00 $1.70 $1,071.00 $2.75 $1,732.50 $0.80 $504.00 $41.00 $82.00 $275.00 $550.00 $50.00 $100.00 $1.00 $100-001 $5.50 $550.00 $3.00 $300.00 $76.00 $228.00 $275.00 $825.00 $75.00 $225.00 $0.50 $175.00 $2.75 $962.50 $1.20 $420.00 $1.20 $1,680.00 $5.50 $7,700.00 $1.00 $1, 400.00 $110.00 $220.00 $1,375.00 $2,750.00 $175.00 $350.00 $47,000.00 $47,000.00 $49,764.00 $49,764.00 $35,000.00 $35,000.00 $20,000.00 $20,000.00 $25,000.00 $25,000-00 $28,000.00 $28,000.00 $47,000.00 $47,000.00 $44,000.00 $44,000.00 $40,000.00 $40,000.00 $750.00 $9,000.00 $880.00 $10,560.00 $200.00 $2,400.00 $600.00 $600.00 $2,530.00 $2,530.00 $550.00 $550.00 $26.00 $8,840.00 $48.00 $16,320.00 $25.00 $8,500.00 $250.00 $21,250.00 $175.00 $14,875.00 $120.00 $10,200.00 $425.00 $199,750.00 $100.00 $471000-00 $310.00 $145,700.00 $8,000.00 $16,000.00 $5,500.00 $11,000.00 $2,500.00 $5,000.00 $12,500.00 $12,500.00 $13,750.00 $13,750.00 $60,000.00 $60,000.00 $0.00 $0.00 $1.00 $1.00 $1.00 $1.00 $1,636 466.50 $1,683,314.75 $1 y767,492.00 $1,636,466.50 a $19683,314.75 $1,7679492.00 ei►036 Teichert Construction Lash Construction Inc Paulus Engineering, Inc. 2871 E. Coronado St. Anaheim, CA 92806 Bidder Status: Valid 8589 Thys Court Sacramento, CA 95828 us Bidder Status: Valid 721 Carpinteria Street Santa Barbara, CA 93103 us Bidder Status: Valid Unit Price Item Total Unit Price Item Total Unit Price Item Total $492.00 $492.00 $492.00 $492.00 $492.00 $492.00 $36,000.00 $36,000.00 $6,530.00 $6,530.00 $6,981.08 $6,981.08 $165,000-00 $165,000.00 $186,000-00 $186,000.00 $95,744.20 $95,744.20 $5,000.00 $5,000.00 $22,330.00 $22,330.00 $7,534.50 $7,534.50 $8,500-00 $8,500-00 $10,000.00 $10,000.00 $5,492.16 $5,492.16 $25,000-00 $25, 000.00 $12,800.00 $12,800.00 $5,348.40 $5,348.40 $380.00 $150,480.00 $452.00 $178,992.00 $179.49 $71,078.04 $375.00 $57,000.00 $388.00 $58,976.00 $137.82 $20,948.64 $330.00 $15,840.00 $387.00 $18,576.00 $941.95 $45,213.60 $315.00 $787.50 $505.00 $1,262.50 $118.63 $296.58 $500.00 $3, 500.00 $181.00 $1,267.00 $113.34 $793.38 $240.00 $55,200.00 $292.00 $67,160.00 $206.88 $47,582.40 $1,800.00 $18,000.00 $1,650.00 $16,500.00 $2,295.97 $22,959.70 $1,700.00 $17,000.00 $1,480-00 $14,800-00 $2,041.78 $20,417.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,600.00 $36,400.00 $1,160.00 $26,390.00 $12,325.66 $280,408.77 $1,100.00 $44,000.00 $908.00 $36,320-00 $1,558.25 $62,330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,300.00 $52,000.00 $1,015.00 $40,600 * 00 $1,834.28 $73,371.20 $990.00 $39,600.00 $760.00 $30,400.00 $1,094.17 $43,766.80 $2,400.00 $127,200.00 $1,523.00 $80,719.00 $1,596.39 $84,608.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,800.00 $7,800.00 $2,600.00 $2,600.00 $7,823.21 $7,823.21 $36.00 $1,800.00 $47.00 $2,350.00 $69.00 $3,450.00 $6,000.00 $12,000.00 $1,125.00 $2,250.00 $9,969.58 $19,939.16 $10,000.00 $10,000.00 $5,800-00 $5,800-00 $10,023.74 $10,023.74 $22,000.00 $22,000.00 $17,800.00 $17,800.00 $15,653.63 $15,653.63 $7,500-00 $30, 000.00 $4,700.00 $18,800.00 $7,024-80 $28,099.20 $90.00 $12,150.00 $42.00 $5,670.00 $68.67 $9,270.45 $106,000.00 $106,000.00 $130,300.00 $130,300.00 $116,257.33 $116,257.33 $200.00 $40,400.00 $425.00 $85,850.00 $129.48 $26,154.96 $340.00 $32,640.00 $431.00 $41,376.00 $334.63 $32,124.48 $5,000.00 $5,000.00 $2,600.00 $2,600.00 $618.67 $618.67 $10,000.00 $10,000.00 $7,900.00 $7,900.00 $3,157.84 $3,157.84 $11,000.00 $22,000.00 $1,700.00 $3,400.00 $1,568.48 $3,136.96 $16,224.00 $16,224.00 $5,500-00 $5,500-00 $5,516-95 $5,516-95 $13.50 $7,830-00 $14.00 $8,120.00 $14.10 $8,178.00 $5.00 $2,075.00 $5.50 $2,282.50 $5.44 $2,257.60 $2.60 $1,248.00 $3.00 $1,440.00 $2.78 $1,334.40 $630.00 $5,670.00 $675.00 $6,075.00 $678.96 $6,110.64 $20.00 $29,200.00 $16.60 $24,236.00 $25.90 $37,814.00 $12.00 $18,600.00 $13.00 $20,150.00 $21.39 $33,154.50 $10.00 $12, 500.00 $6.50 $8,125.00 $5.63 $7,037.50 $830.00 $4, 980.00 $1,177.00 $7,062.00 $1,801-56 $10,809-36 $5.00 $151000.00 $6.00 $18,000.00 $5.63 $16,890.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31.00 $13,950.00 $7.00 $3,150.00 $15.76 $7,092.00 $1.60 $8'000. 00 $1.30 $6,500.00 $1.52 $7,600.00 $32.00 $86,400.00 $26.00 $70,200.00 $21.32 $57,564.00 $130.00 $143, 000.00 $108.00 $118,800.00 $86.70 $95,370.00 $560.00 $2,240.00 $250.00 $1,000.00 $506.70 $2,026.80 $460.00 $1,840.00 $225.00 $900.00 $365.95 $1,463.80 $280.00 $1,120.00 $300.00 $1,200.00 $299.51 $1,198.04 $168.00 $2,520.00 $168.00 $2,520.00 $247.72 $3,715.80 $179.00 $358.00 $179.00 $358.00 $309.65 $619.30 $168.001 $336.00 $168.00 $336.00 $281.50 $563.00 $168.00 $336.00 $168.00 $336.00 $253.35 $506.70 $168.00 $336.00 $168.001 $336.00 $281.50 $563.00 $0.22 $138.60 $0.25 $157.50 $0.79 $497.70 $39.00 $78.00 $39.00 $78.00 $45.04 $90.08 $0.90 $90.00 $0.90 $90.00 $2.25 $225.00 $73.00 $219.00 $73.00 $219.00 $73.19 $219.57 $0.28 $98.00 $0.28 $98.00 $1.13 $395.50 $0.50 $700.00 $0.50 $700.00 $0.96 $1,344.00 $106.00 $212.00 $106.00 $212.00 $168.90 $337.80 $42,000.00 $42,000.00 $48,000.00 $48,000-00 $45,309.38 $45,309.38 $30,000.00 $30,000.00 $36,100.00 $36,100.00 $36,290.30 $36,290.30 $47,200.00 $47,200.00 $44,800.00 $44,800.00 $45,005.38 $45,005.38 $1,300.00 $15,600.00 $560.00 $6,720.00 $562.98 $6,755.76 $1,450.00 $1,450.00 $2,274.00 $2,274.00 $562.98 $562.98 $27.00 $9,180.00 $30.00 $10,200.00 $25.74 $8,751.60 $115.00 $9,775.00 $223.00 $18,955.00 $189.18 $16,080.30 $93.00 $43,710.00 $390.00 $183,300.00 $374.99 $176,245.30 $10,000.00 $20,000.00 $9,700.00 $19, 400.00 $9,521.91 $19,043.82 $34,000.00 $34,000.00 $4,000.00 $4,000.00 $11,259.80 $11,259.80 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1 y7979004.1 0 $1 818 741.50 $1,846,878.20 $19797,004.10 I j $1,818,741.50 $198462878.20 �. 0 ?g Union Engineering Company, Inc Blois Construction, Inc. PO Box 1000 Ventura, CA 93002 Bidder Status: Valid 3201 Sturgis Road Oxanrd, CA 93030 Bidder Status: Valid Unit Price Item Total Unit Price Item Total $492.00 $492.00 $492.00 $492.00 $18,100.00 $18,100.00 $60,882.00 $60,882.00 $178,000.00 $178,000.00 $149,464.00 $149,464.00 $59,000.00 $59,000.00 $23,874.00 $23,874.00 $26,100.00 $26,100.00 $26,594.00 $26,594.00 $14,200.00 $14,200.00 $400,729.00 $400,729.00 $720.00 $285,120.00 $504.00 $199, 584.00 $550.00 $83,600.00 $331.00 $50,312.00 $440.00 $21,120.00 $326.00 $15,648.00 $550.00 $1,375.00 $871.00 $2,177.50 $330.00 $2,310.00 $487.00 $3,409.00 $180.00 $41,400.00 $162.00 $37,260.00 $1,480.00 $14,800.00 $3,656.00 $36,560.00 $990.00 $9,900.00 $4,411.001 $44,110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $810.00 $18,427.50 $2,246.00 $51,096.50 $840.00 $33,600.00 $21413.00 $96,520.00 $0.00 $0.00 $0.00 $0.00 $1,250.00 $50,000.00 $2,227.00 $89,080.00 $670.00 $26,800.00 $2,103.00 $84,120.00 $1,220.00 $64,660.00 $2,692.00 $142,676. 00 $0.00 $0.00 $0.00 $0.00 $1,120.00 $1,120.00 $3,673.00 $3,673.00 $40.00 $2,000.00 $45.00 $2,250.00 $5,360.00 $10,720.00 $4,490.00 $8,980.00 $4,900.00 $4,900.00 $7,911.00 $7,911.00 $6,040.00 $6,040.00 $13,000.00 $13, 000.00 $2,850.00 $11,400.00 $3,946.00 $15,784.00 $22.00 $2,970.00 $91.00 $12,285.00 $123,300.00 $123,300.00 $207,798.00 $207,798.00 $200.00 $40,400.00 $219.00 $44,238.00 $300.00 $28,800.00 $302.00 $28,992.00 $2,620.00 $2,620.00 $733.00 $733.00 $9,190.00 $9,190.00 $7,644.00 $7,644.00 $3,350.00 $6,700.00 $5,825.00 $11,650.00 $10,150.00 $10,150.00 $19,177.00 $19,177.00 $15.00 $8,700.00 $15.00 $8,700.00 $6.00 $2,490.00 $6.00 $2,490.00 $3.00 $1,440.00 $3.00 $1,440.00 $690.00 $6,210.00 $721.00 $6,489.00 $25.00 $36,500.00 $21.00 $30,660.00 $16.00 $24,800.00 $11.00 $17,050.00 $13.00 $16,250-00 $12.00 $15,000.00 $1,770.00 $10,620.00 $1,132.00 $6,792.00 $12.00 $36,000.00 $7.00 $21,000.00 $0.00 $0.00 $0.00 $0.00 $11.00 $4,950.00 $12.00 $5,400.00 $1.00 $5,000-00 $2.00 $10,000.00 $28.00 $75,600.00 $39.00 $105,300.00 $93.00 $102,300.00 $133.00 $146,300.00 $690.00 $2,760.00 $568.00 $2,272.00 $570.00 $2,280.00 $323.00 $1,292.00 $300.00 $1,200.00 $318.00 $1,272.00 $170.00 $2,550.00 $227.00 $3,405.00 $180.00 $360.00 $305.00 $610.00 $170.00 $340.001 $299.00 $598.00 $170.00 $340.001 $257.00 $514.00 �. 0 ?g $170.00 $340.00 $239.00 $478.00 $0.25 $157.50 $3.00 $1,890.00 $40.00 $80.00 $90.00 $180.00 $1.00 $100.00 $4.00 $400.00 $75.00 $225.00 $96.00 $288.00 $0.30 $105.00 $1.00 $350.00 $0.50 $700.00 $2.00 $2,800.00 $110.00 $220.00 $239.00 $478.00 $46,000.00 $46,000.00 $48,144.00 $48,144.00 $50,000-00 $50,000-00 $38,952.00 $38,952 - 00 $20,000.00 $20, 000.00 $48,603.00 $48,603.00 $1,000.00 $12,000.00 $663.00 $7,956.00 $1,600.00 $1,600.00 $1,909.00 $1,909.00 $30.00 $10,200.00 $32.00 $10,880.00 $220.00 $18,700.00 $240.00 $20,400.00 $330.00 $155,100.00 $508.00 $238,760.00 $4,200.00 $8,400.00 $7,609.00 $15,218.00 $34,000.00 $34,000.00 $52,485.00 $52,485.00 $1.00 $1.00 $1.00 $1.00 $1 v907 933.00 $29775y459.00 $199079933.00 $297759459.00