HomeMy WebLinkAboutRES CC 1987 430 1987 1109VTT 4342
ZC 2817
RPD 1072
RESOLUTION NO. 87 -430
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, CERTIFYING THAT THE PLANNED
COMMUNITY NO. 3 (MOUNTAIN MEADOWS) EIR ADEQUATELY
ADDRESSES THE SUBJECT PROJECT, AND APPROVES
VESTING TENTATIVE TRACT NO. 4342, AND RESIDENTIAL
PLANNED DEVELOPMENT PERMIT NO. RPD -1072 ON
APPLICATION OF URBAN WEST COMMUNITIES.
WHEREAS, at duly notice public hearing on
October 14, 1987, the Moorpark City Council considered the
subject application for the rezoning of a 84.1 acre parcel
from the "P -C" (Planned Community) to the RPD -3.1
(Residential Planned Development, 3.1 Units to the Acre)
zone; the subdivision of the subject parcel into 181 lots;
and a Residential Planned Development permit to construct
1796 single family dwellings and two neighborhood recreation
complexes as part of the Mountain Meadow (PC -3) development
on Peach Hill.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF
MOORPARK CALIFORNIA, DOES RESOLVE AS FOLLOWS:
SECTION 1. That this body after review and
consideration of the Environmental Impact Report prepared
for Planned Community No. 3 (Mountain Meadows) , finds that
the environmental effects of these proposed projects are
similar enough to warrant the same treatment in the EIR, and
certify that the Planned Community No. 3 EIR adequately
covers the impacts of these projects and pursuant to Section
15162 of the State CEQA Guidelines, that this body has
reviewed and considered the information contained therein
and endorses the reasons which have been given in the staff
report for allowing the occurrences of the significant
cumulative impacts identified in the EIR.
SECTION 2. The City Council adopts the
findings contained in the staff report dated September 28,
1987, which report is incorporated herein by reference as
though fully set forth herein.
SECTION 3. The City Council hereby
conditionally approves Vesting Tentative Tract No. TR -4342
subject to compliance with all the conditions attached
hereto. (Exhibit 1)
-1-
SECTION 4. The City
conditionally approves Residential
Permit No. PD -1072, subject to
conditions attached hereto. (Exhibi
the foregoing direction was approved
call vote;
VTT 4342
ZC 2817
RPD 1072
Council hereby
Planned Development
compliance with all
t 2) The action with
by the following roll
AYES: Councilmembers Brown, Ferguson, Galloway, Lane and
Mayor Harper.
NOES: None.
ABSENT: None.
PASSED, AND ADOPTED this 9th day of NoveMber, 1987.
ATTEST:
cbt D
Mayor
Z
ro
City Clerk
0
awi246.con
-2-
EXHIBIT 1
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
COMMUNITY DEVELOPMENT DEPARTMENT
1. The Conditions of Approval of this Vesting Tentative
Map supersede all conflicting notations,
specifications, dimensions, typical sections of the
like which may be shown on said map.
2. All applicable requirements of any law or agency of the
State, City of Moorpark and any other governmental
entity shall be met, and all such requirements and
enactments shall, by reference, become conditions of
this entitlement.
3. The developer's recordation of this map and /or
commencement of construction consistent with the
implementation of measure F and /or operations as a
result of this map shall be deemed to be acceptance of
all conditions of this map by the applicant.
4. The development shall be subject to all applicable
regulations of the Residential Planned Development
Zone.
5. No zoning Clearance shall be issued for residential
construction until the final map has been recorded and
an allocation has been granted. Prior to the issuance
of any permit, a zoning clearance shall be obtained
from the Department of Community Development and a
building permit shall be obtained from the department
of Building and Safety only after the granting of an
allocation and a zoning clearance.
6. Prior to approval of Final Map, the developer shall
demonstrate by possession of a District Release from
the Calleguas Municipal Water District and that
arrangement for payment of the Construction Charge
applicable to the proposed subdivision has been made.
7. The Vesting Tentative Map shall expire three years from
the date of its approval. Failure to record a final
map with the Ventura County Recorder prior to
expiration of the Tentative Map shall terminate all
proceedings, and any subdivision of the land shall
require the filing and processing of a new Tentative
Map.
8. The final map shall be recorded in phases as indicated
on a Vesting Tentative tract Map. All conditions which
specify performance prior to Final Map approval can
-1-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
also be satisfied by performance prior to recordation
of each phase.
9. Prior to approval of Final Map, a Homeowners
Association shall be created. Copies of the bylaws,
covenants, conditions and restrictions (CC & R's) shall
be submitted to the City Attorney for review and
approval. The purpose of the Homeowners' Association
shall be to oversee and maintain all recreation
facilities, front yard landscaping, landscaped common
areas, and to assure architectural compatibility with
any new construction and remodeling within the project.
The Homeowners' Association will be responsible for the
maintenance of Parcel D in a manner acceptable to the
Fire Department and City Engineer. A 100 foot fire
protective buffer shall be provided, through brush
clearance. Such buffer shall be maintained in a manner
acceptable to the Fire Department.
That the CC & R's shall evidence future participation
in a City assessment district for the maintenance of
all on -site open space areas, to be activated as
necessary at the City's option, should the Homeowner's
Association not maintain these areas in a satisfactory
manner. Total cost of the maintenance shall be borne
by the lot owners within Tract 4340. Prior to
recordation of each phase the subject area shall be
shown as a future annex area.
10. Prior to approval of Final Map or issuance of a grading
permit, grading plans shall be submitted to the
Director of Community Development and the City Engineer
for review to insure that such plans meet with the
purpose and intent of Measure F and the intent
expressed in the Engineer's conceptual plans and /or the
Vesting Tentative Map.
11. Prior to approval of Final Map, an unconditional
availability letter shall be obtained from the County
Water Works District No. 1 for sewer and water service
for each lot. Said letter shall be filed with the
Department of Community Development or, if said
Unconditional Availability Letter in a form
satisfactory to the City cannot be obtained from the
County Water Works District No. 1, the developer shall
execute a Subdivision Sewer Agreement in a form
satisfactory to the City. Said agreement shall permit
deferral of unconditional guarantee for sewer and water
service until issuance of a building permit for each
-2-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
lot in the subdivision. Said agreement shall include
language holding the City harmless against damages in
the event of the ultimate lack of adequate sewer
service.
12. Valves and manholes shall be provided in all water
lines for each phase such that units occupied in prior
phases will not lose water service during testing of
any new or subsequent phase.
13. At the time water service connection is made, cross
connection control devices shall be installed on the
water system in a manner approved by the County Water
Works District No. 1.
14. That prior to approval of Final Map, agreements to
install water and sewer improvements shall be executed
by the Board of Directors for County Water Works
District #1. Said agreements shall be for improvements
as approved by the Waterworks District Engineer
Manager.
15. Deleted.
16. That prior to approval of the Final Map the Peach Hill
Watercourse shall be designed and installed as a
condition of recommendation of this Vesting Tentative
Tract Map. The design shall be subject to the review
and approval of the parks and Recreation Commission
with final approval by the City Council. A combined
bicycle and pedestrian trail at least 16 feet wide
shall be installed which accommodates pedestrian and
bicycle users.
16a. That the developer shall submit an application for a
planned development permit 'regarding the entire
Community Focus (parcel A) within Tract 4342 before
occupancy of any of lots 1 through 77 of Tract 4342.
16b. That no asbestos pipe or construction materials shall
be used for this project entitlement without prior
approval of the City Council.
FIRE DEPARTMENT CONDITIONS
17. That access roads shall be installed with an all
weather surface, suitable for access by Fire Department
apparatus.
-3-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
18. That when only one access point is provided the maximum
length of such access shall not exceed 800 feet.
19. That approved turnaround areas for fire apparatus shall
be provided where the access road is 150 feet or
farther from the main thoroughfare.
20. That prior to approval of Final Map, street names shall
be submitted to the Fire Department Communication
Center for review.
21. That street signs shall be installed prior to
occupancy.
22. That prior to construction, the applicant shall submit
plans to the Ventura County Bureau of Fire Prevention
for the approval of the location of fire hydrants
showing existing hydrants within 500 feet of the
development on the plan.
23. That a minimum fire flow of 1000 gallons per minute
shall be provided at this location.
24. That fire hydrants shall be installed and in service
prior to combustible construction and shall conform to
the minimum standards of the County Water Works Manual.
a. Each hydrant shall be a 6" wet barrel design, and
shall have one 4" and 1 - 1/2" outlet.
b. The required fire flow shall be achieved at no
less than 20 psi residual pressure.
C. Fire hydrants shall be spaced 500 feet on center
and so located that no structure will be farther
than 250 feet from any one hydrant.
d. Fire hydrants shall be 24" on center recessed in
curb face.
25. In all grass or brush exposed to any structure shall be
cleared for a distance for 100 feet prior to framing,
according to the Ventura County Weed Abatement
Ordinance.
26. That an approved spark arrester shall be installed on
the chimney of any structure.
-4-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
27. That unless otherwise approved by the Fire Department
address numbers, a minimum of 6" high shall be
installed prior to occupancy and shall be contrasting
color to the background and shall be readily visible at
night. Where structures are set back more than 150
feet from the street, larger numbers will be required
so that they are distinguishable from the street. In
the event the structure(s) is not visible from the
street, the address number(s) shall be posted adjacent
to the driveway entrance.
28. That portions of this development may be in a hazardous
area and those structures shall meet hazardous fire
area building code requirements.
29. Deleted.
30. That a street width of 36 feet shall be provided.
Courts C, K, M, O, and P may have a street width of 32
feet.
CITY ENGINEER
31. Use of colored concrete (Omaha Tan by Davis Concrete or
equivalent) shall be utilized in all concrete drainage
ditches.
32. Portions of the proposed Vesting Tentative Tract Maps
may fall within Zone A (100 year flood plain) of the
Arroyo Simi. Prior to approval of Final Map, the
developer shall demonstrate to the satisfaction of the
Ventura County Flood Control District that any such
hazard has been eliminated in a manner acceptable to
the District.
33. All common open space slopes along arterial and
collector streets which are landscaped shall be covered
with jute so that irrigation lines do not remain
visible during initial growth of ground cover.
34. The developer's engineer shall prepare hydrology
calculations, for review and approval by the County
Flood Control District, indicating new drainage flows
expected to leave Parcel F, upon complete development
of Mountain Meadows. If such calculations indicate
potential drainage or flooding problems off site, the
developer shall propose mitigation measures for review
by the City Engineer and Flood Control District and
shall install any such improvements as may be required.
-5-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
35. That prior to approval of Final Map, the developer
shall submit to the City of Moorpark for review and
approval, a grading plan consistent with Measure "F"
prepared by a Registered Civil Engineer; shall obtain a
Grading Permit; and shall post sufficient surety
guaranteeing completion. Fine lot grading and drainage
plans shall avoid, whenever possible, curb -cut
drainpipes.
36. That prior to approval of Final Map, the developer
shall submit to the City of Moorpark for review and
approval, a detailed Soils Report certified by a
registered professional Civil Engineer in the State of
California. The grading plan shall incorporate the
recommendations of the approved Soils Report.
37. That prior to approval of Final Map, the developer
shall submit to the City of Moorpark for review and
approval, street improvement plans prepared by a
Registered Civil Engineer; shall enter into an
agreement with the City of Moorpark to complete the
improvements; and shall post sufficient surety
guaranteeing the construction of the improvements.
Also, prior to approval of the Final Map, the Planning
Commission shall approval final alignment of streets.
The improvements shall include concrete curb and
gutter, sidewalk, street lights, striping and signing,
and paving in accordance with the Ventura County Road
Standards. The applicable Road Standard Plates are as
follows:
Plate B -5A: "B" Street, "F" Street, "G" Street
between "H" Street and "I" Street, "H" Street
between "A" Street and "G" Street, and I'L" Street
between "J" Street and "H" Street
Plate B -5B: "D" Court, "E" Street, "G" Street
between "I" Street and "E" Street, "H" Street
between "G" Street and "L" Street, "I" Street, "L"
Street between "H" Street and "I" Street, "N"
Street and "P" Court.
Plate B -5C: "C" Court, "K" Court, "M" Court and
"O" Court
Modified Plate B -4A: "A" Street, "J" Street, and
"Q" Street to be constructed with 43 foot
right -of -way, as shown on the Tentative Map, with
a 5 foot public service easement outside and
adjacent to the right -of -way lines.
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
A meandering sidewalk shall be constructed outside
the right -of -way line along "A" Street, "J"
Street, and "Q" Street. The design of the
meandering sidewalk shall be reviewed and approved
by the Director of Community Development.
A Class II bike path shall be provided along "A"
Street, "J" Street and "Q" Street. Parking shall
be prohibited along these streets.
The intersection of "A" Street and Tierra Rejada
Road, and "Q" Street and Tierra Rejada Road, shall
align with the entrances to the High School.
- All driveways per Plate E -1.
Tierra Rejada Road (Spring Road to Moorpark Road)
One (1) month ( 30 days) prior to approval of the Final Map,
the developer shall:
A. Complete for approval by the City Council, a study for
the widening of Tierra REjada Road between Spring Road
and Moorpark Road from two to four travel lanes. This
study shall include alignment, right -of -way,
environmental and other considerations as determined
necessary by the City Council after recommendation by
the City Engineer; and
B. Preliminary design of the improvements determined
necessary by the City Council to provide for four
travel lanes as referenced above, excluding the
construction of the median.
Prior to the issuance of the first zone clearance for the
West Village (Tracts 4340, 4341 and 4342) the developer
shall have prepared plans and specifications for the
referenced improvements to the satisfaction of the City
Engineer. Prior to the issuance of the 150th occupancy for
the West Village, the developer shall complete construction
of the referenced improvements as approved by the City
Engineer. Acquisition of the right -of -way necessary for
this improvement shall be the responsibility of the City.
In the event said acquisition delays the construction of the
project and the developer has reached the 150th occupancy in
the West Village the developer shall be permitted to
continue with additional occupancies. It is the
responsibility of the developer to notify the City Council
of its intended construction schedule in sufficient time to
allow the City to acquire right -of -way and perform any other
services such as plan check so as to not impact the
developer's obligation to have construction completed by the
150th occupancy in the West Village.
-7-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
For those improvement costs north of the ultimate center
line of Tierra Rejada Road, the City shall condition the
adjacent property owner to reimburse the developer for these
costs at the time of development pursuant to applicable
provisions of the State Map Act. For those improvement
costs south of the ultimate center line of Tierra Rejada
Road and /or outside of the City limits, the City will either
utilize the applicable provisions of the State Map Act and/
or incorporate said costs into the Moorpark Road /Tierra
Rejada Road Area of Contribution, any successor or
complementary /supplementary method comparable to the
existing Area of Contribution mechanism. Although curb,
butter, and raised median will not be required, provisions
must be made for future drainage and street light
facilities. The design must provide for future widening to
conform to either Plate B -2A or B -2B.
The existing roadway shall be widened/ reconstructed per
Plate B -2B, for a distance approved by the City Engineer, to
provide sufficient pavement width to facilitate efficient
intersection operation. It is intended that two travel
lanes in each direction be provided as well as a westbound
right turn lane. In the event that the traffic signal is
installed at this intersection prior to completion of this
work, the developer may be required to perform any necessary
signal modifications /relocations.
The developer shall receive reimbursement from available
A.O.C. funds when funds are determined to be available by
the City Council. This reimbursement shall not occur until
other reimbursement obligations predating these
reimbursements are met. In addition, in the event other
traffic signals or other improvements funded by the A.O.C.
are warranted as determined by the City Engineer then the
developer's reimbursement shall be postponed until funds
later become available.
38. That in conjunction with the approval of the Final Map,
the developer shall offer to dedicate on the Final Map
to the City of Moorpark for public use, all the public
streets right -of -way shown on the Final Map.
39. That prior to any work being conducted within the State
or City right -of -way, the developer shall obtain an
Encroachment Permit from the appropriate Agency.
40. That in conjunction with approval, the developer shall
dedicate on the Final Map to the City of Moorpark the
access rights adjacent to "A" Street, "J" Street and
"Q" Street along the entire frontage of the parent
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
parcel except for approved access road(s) as delineated
on the approved Tentative Maps.
41. That prior to approval of Final Map, the developer
shall demonstrate for each building pad to the
satisfaction of the City of Moorpark as follows:
a. Adequate protection from 100 -year frequency storm;
and
b. Feasible access during a 10 -year frequency storm.
Hydrology calculations shall be per current Ventura
County Standard.
42. That prior to issuance of a zone clearance for any
building permit, the developer shall pay to the City of
Moorpark the applicable contribution to the Moorpark
Road /Tierra Rejada Road Area of Contribution (AOC).
The actual payment shall be the then applicable fee
rate at time of payment of the City for the AOC or its
successor. It is acknowledged that the AOC is subject
to periodic revision and is currently under review as a
result of the findings of the 'Traffic Impact Study For
Tracts 4340, 4341, and 4342' dated September 24, 1987
and to reflect known and updated construction costs
including but not limited to the Tierra Rejada Road
Bridge and Tierra Rejada Road median improvements.
43. That in conjunction with approval of Final Map, the
developer shall offer to dedicate on the Final Map to
the City of Moorpark, a Public Service Easement as
required.
44. That prior to approval of Final Map, the developer
shall indicate in writing to the City of Moorpark, the
disposition of any water well(s) that may exist within
the site. If any wells are proposed to be abandoned,
or if they are abandoned and have not been properly
sealed, they must be destroyed per Ventura County
Ordinance No. 2372.
45. That prior to the submittal of the Final Map, the
developer shall transmit by certified mail a copy of
the conditionally approved Tentative Map together with
a copy of the conditionally approved Tentative Map
together with a copy of Section 66436 of the State
Subdivision Map Act to each public entity or public
utility that is an easement holder or record. Written
compliance shall be submitted to the City of Moorpark.
Q�
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
46. If any of the improvements which the subdivider is
required to construct or install is to be constructed
or installed upon land in which the subdivider does not
have title or interest sufficient for such purposes,
the subdivider shall do all of the following at least
60 days prior to the filing of the final or parcel map
for approval pursuant to Government Code Section 66457.
a. Notify the City of Moorpark (hereafter "City ") in
writing that the subdivider wishes the City to
acquire an interest in the land which is
sufficient for such purposes as provided in
government Code Section 66462.5;
b. Supply the City with (i) a legal description of
the interest to be acquired, (ii) a map or diagram
of the interest to be acquired sufficient to
satisfy the requirements of subdivision (e) of
Section 1250.310 of the Code of Civil, Procedure,
(iii) a current appraisal report prepared by an
appraiser approved by the City which expresses an
opinion as to the current fair market value of the
interest to be acquired, and (iv) a current
Litigation Guaranteed Report;
C. Enter into an agreement with the City, guaranteed
by such cash deposits or other security as the
City may require, pursuant to which the subdivider
will pay all of the City's cost (including,
without limitation, attorney's fees and overhead
expenses) of acquiring such an interest in the
land.
47. That prior to approval of Final Map, the developer
shall submit to the City of Moorpark for review and
approval, drainage plans, hydrologic, and hydraulic
calculations prepared by a Registered Civil Engineer;
shall enter into an agreement with the City of Moorpark
to complete the improvement and shall post sufficient
surety guaranteeing the construction of the
improvements. The drainage plans and calculations
shall indicate the following conditions before and
after development:
Quantities of water, water flow rates, major water
courses, drainage areas and patterns, diversions,
collection systems, flood hazard areas, sumps and
drainage courses.
-10-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
Hydrology shall be per current Ventura County Standard.
Storm drain systems shall be per Ventura County
Standards except as follows:
a. all sumps shall carry a 50 -year frequency storm;
b. all catch basins on continuous grade shall carry a
10 -year storm;
C. all catch basins in a sump condition shall be
sized such that depth of water at intake shall
equal depth of approach flows;
d. all culverts shall carry a 100 -year frequency
storm;
e. drainage facilities shall be provided such that
surface flows are intercepted and contained prior
to entering collector or secondary roadways;
f. under a 10 -year frequency storm, all collector
streets shall be provided with a minimum of one
travel lane with a goal that local, residential
streets shall have one travel lane available
wherever possible.
48. That in conjunction with approval of the Final Map, the
developer shall delineate on the Final Map areas
subject to flooding as a "Flowage Easement" and then
offer the easement for dedication to the City of
Moorpark. Lot to lot drainage easements, flood hazard
areas and secondary drainage easements shall also be
delineated on the Map.
The subject easements shall be identified based on
hydrologic and hydraulic methodology approved by the
Ventura County Flood Control District.
49. That prior to any work to be conducted within the Peach
Hill Watercourse, the developer shall obtain a Ventura
County Flood Control District Watercourse Encroachment
Permit.
50. That prior to approval of Final Map, the developer
shall submit to the City of Moorpark for review and
approval, evidence that the CC &R's will include
provisions for maintenance of the landscape easements
along Mountain Trail Street, "A" Street, "J" Street and
"Q" Street.
-11-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
That the CC & Res shall evidence future participation
in a City assessment district for the maintenance of
all on -site open space areas, to be activated as
necessary at the City's option, should the Homeowners
Association not maintain these areas in a satisfactory
manner. Total cost of the maintenance shall be borne
by the lot owners within Tract 4342. Prior to
recordation of each phase the subject area shall be
shown as a future annex area.
51. That prior to approval of Final Map, the developer
shall pay all energy costs associated with street
lighting for a period of one year from the initial
energizing of the street lights.
52. If grading is to take place during the rainy season, an
erosion control plan shall be submitted for review and
approval along with the grading plan. Along with the
erosion control measures, hydroseeding of all graded
slopes shall be required within 60 days of completion
of grading.
53. If the land which is to be occupied is in an area of
special flood hazard, the developer shall notify all
potential buyers of this hazard condition.
54. That drainage easements and secondary drainage
easements shall be delineated on the final map.
Assurance shall be provided to the City that these
easements will be, as a minimum, adequately maintained
by property owners in good repair and clear to convey
storm water.
55. That the developer shall construct any necessary
drainage facility, including brow ditch and slope bench
drainage channels.
56. That in order to reduce visual impacts, the developer
shall construct all slopes with a "rounded -off" top and
toe, shall blend graded slopes in with natural slopes,
and shall also undulate and vary the angle of slope
faces so as to break -up the appearance of otherwise
flat and uniform slope faces on slopes over 25 feet in
height.
57. A slough wall approximate 18" in height or french drain
with curb outlet shall be constructed behind the back
of the sidewalk where slopes are adjacent to sidewalk
so as to reduce debris from entering sidewalk and
streets at locations required by the City Engineer and
-12-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
Director of Community Development. Wall material shall
be approved by Director of Community Development.
58. If any hazardous waste is encountered during the
construction of this project, all work shall be
immediately stopped and the Ventura County
Environmental Health Department, the Fire Department,
the Sheriff's Department, and the Public Works shall be
notified immediately. Work shall not proceed until
clearance has been issued by all of these agencies.
59. Where roads are to be built requiring 4 inches of
pavement, developer shall construct 3 inches of paving
as an interim condition until all utility cuts or
trenching is completed. The final 1 inch cap of
asphalt shall be placed after all necessary trenching
is completed.
60. Prior to zone clearance, the developer shall have
prepared a geotechnical investigation with regard to
liquifaction, expansive soils, and seismic safety. Per
the City's safety element, this report shall be
prepared by a Registered Professional Civil Engineer or
Geologist.
61. All borrow /fill sites outside of tract or phase
boundaries shall be shown on the Grading Plan. the
City shall be notified 2 days prior to any import/
export operation and the route to be used shall be
approved by City Engineer
62. No trees with a trunk diameter in excess of 4 inches
shall be trimmed or removed without prior authorization
of the City Council
63. Drainage for each phase shall be designed and installed
with all necessary appurtenances to safely contain and
convey storm flows to their final point of discharge,
subject to review and approval by the City Engineer for
each phase.
64. Prior to approval of the Final Map, the developer shall
post sufficient surety with the City in an amount
determined by the City Engineer for construction of the
traffic signals at the intersection listed below. The
amount is currently estimated at $720,000 pursuant to
the Moorpark Road /Tierra Rejada Road Area of
Contribution (A.O.C.) Report. The developer shall be
responsible for the commencement and completion of
construction of the traffic signals at the intersection
-13-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
of Tierra Rejada Road with each of the streets and
according to the timing listed below. The developer
shall not be required to pay the applicable A.O.C. fees
as long as actual construction costs to date for the
referenced traffic signals exceed the then required
A.O.C. fee payment.
As the signals are installed and /or the developer makes
A.O.C. payments, the amount of the surety shall be
reduced by the City in the corresponding amount. The
surety does not take place of the A.O.C. payment.
a. Walnut Creek Road - At the occupancy of the 600th
single family detached dwelling unit in the South
Village and opening of the Tierra Rejada Bridge or
issuance of a zone clearance in Tract 4340, 4341,
or 4342, whichever occurs first unless signal
warranted or determined needed by the City
Engineer.
b. Mountain Meadow Drive - At the occupancy of the
600th single family detached dwelling unit in the
South Village and opening of the Tierra Rejada
Bridge or issuance of a zone clearance in Tract
4340, 4341, or 4342, whichever occurs first unless
signal warranted or determined needed by the City
Engineer.
C. Peach Hill - At the occupancy of the 600th single
family detached dwelling unit in the South Village
and opening of the Tierra Rejada Bridge or
issuance of a zone clearance in Tract 4340, 4341,
or 4342, whichever occurs first unless signal
warranted or determined needed by the City
Engineer.
d. Mountain Trail Street - At the occupancy of the
160th dwelling unit in the West Village or
issuance of the first zone clearance in the
Community Focus area of PC -3.
e. "Q" Street /High School Main Entrance - At
occupancy of the 200th dwelling unit in the West
Village, issuance of the 300th zone clearance in
the West Village, or when warrants are satisfied
as determined by the City Engineer, whichever
occurs first.
-14-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
f. "A" Street /High School Faculty Entrance - At
occupancy of the 200th dwelling unit in the West
Village, issuance of the 300th zone clearance in
the West Village, or when warrants are satisfied
as determined by the City Engineer, whichever
occurs first.
The developer shall receive reimbursement from
available A.O.C. funds when funds are determined to be
available by the City Council. This reimbursement
shall not occur until other reimbursement obligations
predating these reimbursements are met. In addition,
in the event other traffic signals or other
improvements funded by the A.O.C. are warranted as
determined by the City Engineer then the developer's
reimbursement shall be postponed until funds later
become available.
64A. Prior to approval of the final map, the developer shall
post sufficient surety with the City in an amount
determined by the City Engineer for construction of the
traffic signal and related intersection improvements at
Spring Road and Tierra Rejada Road. In the event that
another developer has a surety in place with the City
for this purpose, this requirement is suspended so long
as the other surety is in place.
The existing roadway shall be widened /reconstructed per
Plate B -2B, for a distance approved by the City
Engineer, to provide sufficient pavement width to
facilitate efficient intersection operation. It is
intended that two travel lanes in each direction be
provided as well as a westbound right turn lane. In
the event that the traffic signal is installed at this
intersection prior to completion of this work, the
developer may be required to perform any necessary
signal modifications /relocations. Although curb,
gutter, and raised median will not be required,
provisions must be made for future drainage and street
light facilities. The design must provide for future
widening to conform to either Plate B -2A or B -2B.
Prior to the first zone clearance for the West Village
or occupancy of the last single family unit in the
South Village excluding the model homesite, whichever
occurs first, the developer shall construct all
improvements necessary for the signalization of the
Spring Road including all necessary street improvements
at Tierra Rejada Road intersection. This requirement
includes the acquisition of any necessary right -of -way.
All signal costs will be deemed as a credit to the
-15-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
required payments for the Moorpark Road /Tierra Rejada
Road A.O.C. Other street costs along Embassy to be
built by UWC (both north and south sides of Tierra
Rejada Road) to be reimbursed per provisions of Map
Act.
65. Prior to approval of Final Map, the Developer shall
provide the City a surety in an amount acceptable to
the City for improvements to the intersection of Los
Angeles Avenue - Gabbert Road /Tierra Rejada Road. The
Developer shall design and construct the improvements
when deemed necessary by the City Engineer. If the
improvements are not deemed necessary within two years
following final occupancy of all phases of Planned
Community No. 3 this condition will be void and the
letter of credit will be returned.
To assist the City Engineer in determining the need for
intersection improvements, the Developer shall conduct
morning and afternoon peak hour manual turning counts
prior to the issuance of zone clearance for the 1st,
150th, 300th and 499th units in the West Village (Tract
Nos. 43401 4341, and 4342), but no counts will be
required prior to opening of the Tierra Rejada Road
bridge. The intersection improvements contemplated may
include but not be limited to the installation of
northbound and southbound left turn phasing and the
construction of northbound dual left turn lanes.
66. Deleted
67. The storm drain outlet between lots 156 and 157
draining towards the Arroyo Simi shall be further
extended as may be required by the City Engineer and
the Ventura County Flood Control District. The 20'
wide easement between lots 156 and 157 shall be
landscaped and maintained by the HOA.
68. "J" Street between "L" Street and Mountain Trail
Street, and the remaining portions of "L" Street and
Mountain Trail to "J" Street shall be completed
concurrently with Phase 4.
69. The remaining portions of "J" Street and "A" Street
from "J" Street to "H" Street shall be built
concurrently with Phase 5.
70. Deleted
-16-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
71. Prior to approval of Final Map, the developer shall
execute a covenant running with the land on behalf of
itself and its successors, heirs, and assigns, agreeing
to participate in the formation of an assessment
district or other financing technique including but not
limited to the payment of traffic mitigation fees,
which the City may implement or adopt, to fund public
street and traffic improvements directly or indirectly
affected by the development. [This condition shall not
apply to future homeowners.]
72. Deleted.
73. Temporary construction fencing and dust control during
grading shall be maintained to reduce impact on
adjacent areas.
74. City of Moorpark Ordinance No. 42, and the Federal
Emergency Management Agency (FEMA), require updating of
the National Flood Insurance Program maps for affected
areas whenever any alteration of a watercourse is made.
Proposed tracts 4340, 4341, and 4342 are proposing
alternations to the Peach Hill Drain. Therefore, prior
to occupancy of the first unit for these tracts, all
necessary material required by FEMA for a map revision
shall be provided to the City Engineer's office. This
material will demonstrate the new 10, 50, 100, and 500
year flood plain locations along the Peach Hill Drain
following development. This information will be
forwarded by the City Engineer to the Federal Emergency
Management Agency for review and updating of the
National Flood Insurance Program maps. The developer
will be responsible for all costs charged by the
Federal Emergency Management Agency and the City's
administrative costs.
75. Prior to approval of Final Map of any phase in West
Village, The City and Ventura County Flood Control
District shall enter into an agreement whereby it is
clearly defined what maintenance will be performed on
the retention basin park and upstream channel by the
City and that work performed by the Ventura County
Flood Control District. The Homeowner's Association
and City as successor will maintain typical park
improvements and drain improvements as agreed to by the
City. The Ventura County Flood Control District will
provide clean -up services for storm flow related damage
and debris removal within an agreed response time as
well as maintenance of typical drain and channel
improvements. The developer, Homeowner's Association,
-17-
Vesting Tentative Tract Map 4342
Urban West Communities
September 28, 1987
shall provide for a minimum of one (1) year of
maintenance after acceptance of the improvements by the
City and Flood Control District for the City portion of
said maintenance.
COUNTY OF VENTURA FLOOD CONTROL DISTRICT
76. If not already accomplished, the fully improved portion
of Peach Hill Wash between Tierra Rejada Road and a
point west of "F" Street should be offered for
dedication to the VCFCD.
77. The channel as depicted by Section A -A on the tentative
map should have the 100 -year flood plain defined and be
contained in a flowage easement offered to the VCFCD.
Maintenance of this channel is to be accomplished by
others.
78. The Arroyo Simi is located adjacent to and north of the
development. Those portions of this development that
fall within the VCFCD's existing easement for the
Arroyo Simi as well as additional lands necessary to
contain the VCFCD's proposed channel to contain major
flood flows shall be dedicated to the VCFCD in fee.
Adjacent development shall be set back or proper
protection from erosion to the satisfaction of VCFCD.
79. Any land rights indicated on drawing Y -3 -2102 which
fall exterior of the lands required in 3. above shall
be offered for dedication to the VCFCD as flood control
easements.
80. A VCFCD permit shall be acquired prior to any work
performed on VCFCD jurisdiction channels.
81. A service road shall be constructed on the east side of
the Peach Hill Wash to the satisfaction of the VCFCD.
82. Deleted.
83. Deleted.
84. A crossing of Peach Hill Wash shall be provided in
order to allow access to the service road referenced in
81 above from Dalaway Drive.
85. A VCFCD permit shall be acquired prior to any work
performed on VCFCD jurisdiction channels.
-18-
EXHIBIT 2
Development Plan Permit 1072
Urban West Communities
September 28, 1987
GENERAL CONDITIONS
1. The permit is granted for the land and project as
described in the application and in the attachment
thereto and as amended by the conditions herein.
2. That the permit is granted for all of the buildings,
fences, signs, roadways, parking areas, landscaping and
other features which shall be located substantially as
shown on Exhibits A, D, E, and F except or unless
indicated otherwise herein and subsequently submitted
for final City approval.
3. That the elevation of all buildings shall be
substantially in conformance with the elevation plan
labeled Exhibit M except that all building facades
shall receive architectural treatment.
4. That any minor changes may be
of Community Development.
modification will require the
application to be considered
accordance with the implemen
standards therein.
approved by the Director
However, any major
filing of a modification
by the City Council in
tation of Measure F and
5. That all requirements of any law or agency of the
State, City of Moorpark and any other governmental
entity shall be met.
6. That unless substantial dwelling unit construction has
occurred on all phases within the tract not later than
36 months after the date the permit is granted, this
permit shall automatically expire on that date. The
Director of Community Development may, at his
discretion, grant one additional 12 month extension for
issuance of a zoning clearance provided:
a. the application for extension is made prior to the
expiration of the 36 month period,
b. there have been no changes in the approved plans,
and
C. there has been no change of circumstances which
will prevent the preservation of the integrity,
character, utility or value of the property in the
zone and the general area in which the use is
proposed to be located or will be detrimental to
the public health, safety or welfare, and
-1-
Development Plan Permit 1072
Urban West Communities
September 28, 1987
d. said application is consistent with the
implementation process of Measure F, and
e. once at least 40% of the units have received
compliance review approval from all city
departments and agencies; and are ready for
immediate occupancy with utility meter
installation approved, this RPD shall be valid for
an additional 36 months from original approval
date.
7. That all landscaping and planting in and adjacent to
parking in vehicular area shall be contained within
raised planters surrounded by 6" high concrete curbs.
8. That all utilities shall be placed underground. Any
above grade utility fixtures shall be placed adjacent
to landscaped areas and screened on three sides.
9. That signs are subject to City of Moorpark Ordinance
Code Article 24, Sign Ordinance. Signs in excess of
the ordinance will require a filing of a Conditional
Use Permit.
10. That a transfer of this RPD Permit shall not be
effective until the name and address of the transferee
and the date when such transfer shall be effective
together with a letter from the new owner certifying
agreement to comply with all conditions of the permit
is filed with the Director of Community Development and
acknowledged.
11. That the development is subject to all applicable
regulations of the "RPD" (Residential Plan Development)
zone.
12. That all residential units shall be constructed
employing state of the art energy saving devices as may
be appropriate. These devices are to include, but are
not limited to the following:
a. low flush toilets (not -to- exceed 3 -1/2 gallons)
b. shower controllers
C. stove, ovens and ranges when gas fueled shall not
have continuous burning pilot lights
d. all thermostats connected to the main space
heating source to have night set back features
-2-
Development Plan Permit 1072
Urban West Communities
September 28, 1987
e. kitchen ventilation system to have automatic
dampers to insure closure when not in use
f. solar panel stubouts
13. That patio covers and accessory structures shall
conform to "R -1" (single- family) zone setbacks. No new
second story decks shall be permitted to the original
structure.
14. That gutters and downspouts shall be provided for all
units. Water shall be conveyed to the street in a
manner approved by the City Engineer. Fine lot grading
and drainage plans shall avoid, whenever possible,
sorb -cut drainpipes.
15. That front yard setbacks may vary according to the
following:
a. the minimum setback to the garage door shall be 20
feet;
b. the minimum setback to a one story building shall
be 15 feet;
C. the minimum setback to a two story building shall
be 20 feet;
16.
Rear yard setbacks shall provide for at
least 20 feet
of flat usable yard as measured
from the
rear lot line.
17.
If and where
swimming pools and
spas are
installed, the
setback from
the pool or spa to
property
line shall be
a minimum of
5 feet.
18.
Deleted
19.
Landscaping
shall not obstruct
any exterior
door or
window.
20. In the event of the unforeseen encounter of subsurface
materials suspected to be of an archaeological or
paleontological nature, all grading or excavation shall
cease in the immediate area, and the find left
untouched until a qualified professional archaeologist
or paleontologist, whichever is appropriate, is
contacted and called in to evaluate and make
recommendations as to disposition, mitigation and /or
salvage. The developer shall be liable for costs
associated with the professional investigation.
-3-
Development Plan Permit 1072
Urban West Communities
September 28, 1987
21. The applicant shall prior to the issuance of a zone
clearance execute a covenant running with the land on
behalf of itself and its successors, heirs and assigns
agreeing to participate in the formation of an
assessment district or other financing technique
including but not limited to the payment of traffic
mitigation fees, which the City may implement or adopt,
to fund public street and traffic improvements directly
or indirectly affected by the development. Traffic
mitigation fees shall be used for projects such as, but
not limited to, the extension of New Los Angeles
Avenue.
22. A Tree Report identifying all trees and the removal of
any trees exceeding 4 inches in diameter must be
submitted to the Department of Community Development
for approval. All trees removed shall be replaced with
an amount of dollar value equivalent to each tree
removed by providing additional landscaping within the
project.
23. The permittee agrees as a condition of issuance and use
of this permit to defend, at his sole expense, any
action brought against the City because of issuance (or
renewal) of this permit or, in the alternative, in
relinquish this permit. Permittee will reimburse the
City for any court costs and /or attorney's fees which
the City may be required by a court to pay as a result
of any such action. The City may, at its sole
discretion, participate in the defense of any such
action, but such participation shall not relieve
permittee of his obligations under this condition.
24. No later than the issuance of the combined 50th
occupancy permit within Tract Nos. 4340, 4341 and 4342,
the developer, any subsequent owner of a multi - family
parcel within PC -3 or a combination of the developer
and one or more subsequent owners, as applicant, shall
(i) apply for appropriate subdivision and land use
development entitlements for a total of at least 200
units of multi - family units within PC -3 in accordance
with the Mountain Meadows Community Plan and (ii)
commencing with the filing period immediately following
the approval or conditional approval of the
entitlements and, as needed, continuing with each
successive filing period, apply for a residential
development allotment under Measure F equal to the
total number of multi- family units authorized by the
entitlements. From the time that any allotment for
multi - family units is awarded until the time that the
-4-
Development Plan Permit 1072
Urban West Communities
September 28, 1987
occupancy permits for all of those units are issued,
zone clearance building permits for single- family units
within Tract Nos. 4340, 4341 and 4342 shall not be
issued in greater number than the building permits for
the multi - family units.
24a. That no asbestos pipe or construction materials shall
be used for this project entitlement without prior
approval of the City Council.
24b. That Class II bicycle path shall be provided on all
collector streets.
PRIOR TO ZONING CLEARANCE
25. That the final design of all buildings, common open
space, recreational facilities (Exhibits Q -1 through
Q -5), walls and fences (Exhibits N and O), including
materials and colors shall be submitted to the Planning
Commission for final review and approval.
a. That prior to issuance of the first zone
clearance, the developer shall submit a plan
showing fencing along the side and rear yards of
each residential lot. Said fencing plan shall
identify the location and materials to be used
(wrought iron, pilasters, masonry, etc, but no
wood except gates) and shall be approved by the
Planning Commission. Said fencing shall be
completed prior to the issuance of a certificate
of occupancy for the affected lot. Wrought iron
fencing shall be provided with pilasters and three
courses of masonry block where approved by City
except slope areas.
26. That a landscaping, planting and wall plan, together
with specifications and a maintenance program shall be
prepared by a State License Landscape Architect. The
purpose of the landscaping will be:
a. to enhance the quality of the development by
landscaping front yards,
b. to control erosion and mitigate the visual impacts
of all man made slopes three feet or more in
height, including the placement of approximately
eighteen inch high masonry slough walls or french
drain with curb outlet per the approval of the
city engineer. Director of Community Development
shall approve wall materials.
-5-
Development Plan Permit 1072
Urban West Communities
September 28, 1987
C. to assure that some drought tolerant plants are
utilized in the landscaping of the property.
three sets of plans shall be submitted prior to
issuance of a zone clearance and approved by the
Director of Community Development. The applicant
shall bear the total cost of such review and a
final installation inspection.
Said landscaping for all common areas shall be
completed as outlined in the phasing plan with all
landscaping installation completed within 30 days of
the last occupancy permit for a phase. The front yard
landscaping of each lot shall be completed within 30
days of occupancy of said lot.
d. That the CC & RFs shall evidence future
participation in a City assessment district for
the maintenance of all on -site open space areas,
to be activated as necessary at the City,s option,
should the Homeowners Association not maintain
these areas in a satisfactory manner. Total cost
of the maintenance shall be borne by the lot
owners within Tract 4340. Prior to recordation of
each phase the subject area shall be shown as a
future annex area.
27. That patio covers and accessory buildings shall be
reviewed and approved by the Homeowners' Association
prior to the issuance of a Zoning Clearance.
28. That plans, including site plan, landscaping, and
architectural shall be submitted for each recreation
lot and all common open space areas for review and
approval by the Parks and Recreation Commission.
29. The developer shall prominently display, in the sales
office, a copy of the Specific Plan under which this PD
Permit is granted.
30. That prior to zone clearance the applicant shall submit
plans indicating architectural treatment of all sides
of the houses for review and approval by the Planning
Commission.
31. That the location and plans, including enclosures, for
postal mail boxes shall be submitted for review and
approval by the Director of Community Development and
Post Master.
0M.
Development Plan Permit 1072
Urban West Communities
September 28, 1987
32. That plans for shelters provided at bus stops shall be
submitted to the Planning Commission for review and
approval.
33. That the developer shall provide, for review and
approval of the Director of Community Development and
City Engineer, alternative light standards (poles and
luminaries).
34. All structures including residential, shall be provided
with automatic fire sprinkler systems in accordance
with Ventura County Ordinance No. 14, unless a new,
closer fire station is in operation prior to the
issuance of a building permit.
35. The developer shall submit to the Director of Community
Development for review and approval, a plan showing the
mix of roof color and materials within each phase.
36a. Prior to issuance of the first zone clearance in the
West Village, the developer shall:
1. Install the stub -in utility line service to the
community park agreed to as part of The Major
Modification of PC -3 approved by the City on
November 4, 1985.
2. Provide improvement plans for the ultimate
construction of the road to the community park
extending from the faculty entrance of the high
school to the west property line of the park in a
precise alignment approved by the City Council.
3. Rough grade the road to the satisfaction of the
City Council. This is intended to allow the
passage of vehicular traffic in fair weather.
Prior to issuance of the 100th zone clearance, the
road shall be installed per plans approved by the
City. The developer and City share equally
(50/50) in the actual construction cost of the
road. Construction cost shall include base and
road surface material, curb, gutter and sidewalk,
including any necessary grading and /or drainage
facilities for this roadway and construction
engineering. Construction costs do not include
design engineering, grading or utilities.
36b. The developer shall have prepared plans and
specifications for the improvements referenced in
tracts 4340, 4341 and 4342 for Tierra Rejada Road to
the satisfaction of the City Engineer. Prior'to the
-7-
Development Plan Permit 1072
Urban West Communities
September 28, 1987
issuance of the 150th occupancy for the West village,
the developer shall complete construction of the
referenced Tierra Rejada Road improvements as approved
by the City Engineer. Acquisition of the right -of -way
necessary for this improvement shall be the
responsibility of the City. In the event said
acquisition delays the construction of the project and
the developer has reached the 150th occupancy in the
West Village the developer shall be permitted to
continue with additional occupancies. It is the
responsibility of the developer to notify the City
Council of its intended construction schedule in
sufficient time to allow the City to acquire
right -of -way and perform any other services such as
plan check so as to not impact the developer's
obligation to have construction completed by the 150th
occupancy in the West Village.
37. That prior to issuance of a zone clearance for any
building permit, the developer shall pay to the City of
Moorpark the applicable contribution to the Moorpark
Road /Tierra Rejada Road Area of Contribution (AOC).
The actual payment shall be the then applicable fee
rate at time of payment of the City for the AOC or its
successor. It is acknowledged that the AOC is subject
to periodic revision and is currently under review as a
result of the findings of the %Traffic Impact Study for
Tracts 4340, 4341, and 4342, dated September 24, 1987
and to reflect known and updated construction costs
including but not limited to the Tierra Rejada Road
Bridge and Tierra Rejada Road median improvements.
Police Department
38. Address shall be clearly visible to approaching
emergency vehicles and mounted against a contrasting
color.
39. Address numbers shall be a minimum of 6 inches in
height and illuminated during the hours of darkness.
40. Front door entrances shall be visible from the street.
41. All exterior doors shall be constructed of solid wood
core a minimum of 1 3/4- inches thick or of metal
construction. Front glass door(s) commonly used for
entry are acceptable but should be visible to the
street.
-8-
Development Plan Permit 1072
Urban West Communities
September 28, 1987
42. Doors utilizing a cylinder lock shall have a minimum
five (5) pin tumbler operation with the locking bar or
bolt extending into the receiving guide a minimum of 1
inch.
43. All residential sliding glass doors or windows shall be
equipped with metal guide tracks at the top and bottom
and be constructed so that the window or door cannot be
lifted from the track when in the closed or locked
position.
44. Upon occupancy by the owner or proprietor, each single
unit in a tract shall have locks using combinations
which are interchange free from locks used in all other
separate dwellings, proprietorships, or similar
distinct occupancies.
During Construction
Police Department
45. A licensed security guard shall be provided during the
construction phase.
46. Construction equipment, tools, etc., shall be properly
secured during non - working hours.
47. All appliances (microwave ovens, dishwashers, trash
compactors, etc.) shall be properly secured prior to
installation during non - working hours. All serial
numbers shall be recorded for identification purposes.