Loading...
HomeMy WebLinkAboutRES CC 1992 865 1992 0629RESOLUTION NO. 92-_865 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA ADOPTING A REVISED FEE SCHEDULE FOR SERVICES RENDERED PURSUANT TO THE MOORPARK CITY CODE RELATING TO PUBLIC WORKS AND CITY ENGINEERING AND RESCINDING RESOLUTION NO. 84 -119 PERTAINING THERETO WHEREAS, State law and the Moorpark City Code require the performance of certain plan review, inspection and other services by the Public Works Director and City Engineer for the purpose of safeguarding the public health, safety and welfare; and WHEREAS, the City Council of the City of Moorpark adopted Resolution No. 84 -119 providing for the collection of certain fees to allow the cost of such services to be borne by the users and beneficiaries of same; and, WHEREAS, the fee schedules for these services must be revised from time to time to assure adequate recovery of all costs associated with rendering such services, and, WHEREAS, the City Council received and considered written evidence and oral testimony pertaining a possible increase in said fees at a public hearing scheduled in accordance with the provisions of Section 66016 of the Government Code and convened on May 6, 1992, and May 20, 1992. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That fees for encroachment permits shall be as set forth in Exhibit "A" attached hereto. SECTION 2. That fees for processing of land division ap- plications and related improvement plans shall be as set forth in Exhibit "B" attached hereto. RESOLUTION 92--86) PAGE 2 SECTION 3. That resolution number 84 -119 relating to fees for land use and development services is hereby rescinded upon the effective date of this Resolution provided, however, if it is determined that the rates, fees and charges set forth herein are wholly or partially invalid by virtue of any statutory or constitutional provisions, then the repeal of resolution 84 -119 and adoption of this resolution as to any such rate, fee or charge is void. SECTION 4. That the fees established in this resolution do not exceed the estimated reasonable cost of providing the service for which the fee is imposed. SECTION 5. The Public Works Director shall report to the City Council on the cost of development services and the adequacy of the fee schedule to recover these costs and shall make such report during the second quarter of each calendar year. SECTION 6. This Resolution shall take effect sixty (60) days from the date of adoption in accordance with the provisions of Section 66017 of the Government Code of the State of California. SECTION 7. The City Clerk shall certify to the adoption of this resolution and shall cause this resolution and its certifi- cation to be filed in the Office of the City Clerk of the City of Moorpark. APPROVED AND ADOPTED this 22t __ - day of June 1992. Mayor ATTEST: vp \rpt \engfe92e EXHIBIT "A" CITY OF MOORPARK ENCROACHMENT FEE SCHEDULE FEE I. GENERAL ENCROACHMENT PERMITS 1. Application /Issuance Fee Without Engineering Review 25.00 with Engineering Review 50.00 2. Pernit/Inspgction Fees: Pernit fees shall be collected in addition to the issuance fee as follows: a. Construction of curb, gutter and /or sidewalk. • Less than 100 linear feet 50.00 • More than 100 linear feet 50.00 : + Plus $0.50 per linear foot ;, ;er 100. b. Construction of residential driveway (each opening). 50.00 c. Construction of Commercial driveway (each opening). 50.00 d. Use of City right -of -way for access to private property (swimming pools, equipment access, etc.) 50.00 e. Major tree trimming, tree removal, stump removal. 50.00 f. Approved landscaping 50.00 q. Surveying and traffic counting (per year) 69.00 h. Miscellaneous construction and /or use of City road right -of -way. 50.00 Annual blanket permit 137.00 Exhibit 'A' Page 2 i. Placing and /or relocation of power or telephone poles (blanket permit per year) Each permit for pole placement and /or relocation II. EXCAVATION PERMITS 1. Application /Issuance Fee: Without engineering review With engineering review FEE 137.00 21.00 25.00 50.00 2. Permit /Inspection Fees for excavations shall be collected in addition to the issuance fee as follows: 100 linear feet or less 69.00 101 to 1,000 linear feet 103.00 1,001 to 3,000 linear feet 137.00 3,001 to 5,000 linear feet 206.00 Excavations exceeding 5,000 linear feet 206.00 plus 0.10 over 5,000. In ft. Any additional costs related to the review of soils reports and /or shoring plans required for trench depths in excess of five feet shall be subject to additional charges sufficient to cover actual costs plus City overhead. 3. Annual blanket permit for utility trenches not exceeding two feet in Width and sixty feet in length, dug at a right angle to the centerline of the road, or an excavation not exceeding thirty square feet in area 137.00 Each excavation permitted under blanket permit 21.00 Exhibit 'A' Page 3 FEE III. TRANSPORTATION PERMITS Permit Fee: 1. permit Fee: Truck or tractor and load exceeding legal width, legal length, legal height and; or legal weight as per State of California Vehicle Code (per vehicle per trip) 14.00 2. Annual Blanket Permit: Truck or tractor and load, maximum width 12 feet, maximum height (loaded) 16 feet, maximum total length 75 feet, weight not to exceed purple loading (per vehicle per year) 69.00 3. Additional chuWs: special services necessitated by unusually large or heavy loads requiring engineering investigations, or other services Actual Cost Plus City Overhead IV. MOVIE AND TELEVISION FILMING Application/ Issuance Fee: Without Engineering Review 25.00 With Engineering review 50.00 2. Permit Fee:_ A filming fee shall be charged for each day 24 hours) or partial day Actual Cost Plus City Overhead 3. Inspection Fee: The City may require that an inspector be present during filming on City public roads. The permittee shall pay to the City the actual costs of providinq the inspector. Actual Cost Plus City Overhead V. EXTRAORDINARY INSPECTION COSTS AND CHARGES FOR CITY LABOR AND M i Extraordinary costs and charges for inspection labor and materials due City shall be charged on the basis of actual cost plus City overhead. Extraordinary costs and charges for City inspection labor and materials shall be defined for purposes of this resolution as any costs or charges incurred by City resulting from permittee's failure to comply with all applicable permit conditions, ordinances and statutes. Exhibit 'A' PAGE 4 VI. EMERGENCY "CALL OUTS" Charges for emergency "call outs" shall be paid at the overtime rate, plus City overhead, for the positions responding for the time of the "call out" (Saturday, Sunday, Holiday, etc.). The charge for any emergency "call out" shall be based upon a minimum time of four hours per employee used, regardless of the actual length of time of the "call out," for up to the first four hours used, and then at said applicable hourly overtime rate, plus City overhead, for the actual number of hours worked. Emergency "call outs" for the purposes of this resolution shall be defined as providing men and equipment called to work at times when nornal Public Works operations are secured. VII. FEE EXEMPTION As required, any Federal, State or local agency shall be exempt from the fees set forth herein, in accordance with applicable State and/or Federal law. VIII. TIME EXTENSION FEE FEE For extension of each permit beyond the expiration date. One (1) extension is allowec. 35.00 IX. GEOLOGY AND GEOTECHNICAL REPORT REVIEW DEPOSIT When the policies, guidelines and procedures of the City require geological or geotechnical submissions, investigations, reports, or reviews, the applicant shall be required to pay an additional fee based on the actual or anticipated actual cost of review services including City overhead. X. OTHER The fee for records search and other services for which no specific fee is otherwise specified shall be the total cost to the City including City overhead as deterained by the Director of Public works. EXHIBIT "B" CITY OF MOORPARK SUBDIVISION FINAL PROCESSING FEE SCHEDULE 1. MAPS a. Tract or Parcel Nap Issuance Fee: $34.00 b. Final Nap, Parcel Nap Cbeck Fee: A Fixed Quality Control fee of $1,671.00 per nap plus $34.00 per lot for the first three map checks and quality control only. C. Additional Checks: Actual Costs including City overhead. A refundable deposit of ($340.00) $465.80 per bap plus $9.59 per lot shall be required for the fourth and each subsequent tap check. d. General Provisions: • Any alterations to the exterior boundary or redesign of any interior lots after the initial tap check will be considered as a new submittal. • All fees shall be paid at the time of submitted. • If the Actual Cost (including the City overhead) of map checking exceeds the total deposits, the developer shall pav the Actual Cost (including City overhead) to the City. • actual Cost shall include: staff labor costs (plus City overhead) and/or contract labor costs (plus City overhead,, plus reimbursable expenses (i. e. blueprinting reproduction, etc.). N800521 " ►nNalD -119 a. Subdivision and other Najor Improvements: !. fixed fee based upon the Fee Schedule set forth in Section 5 of this Exhibit. b. Subdivision and other Major Improvement Plan Changes: An Improvement Plan Change Fee of 3% of the estimate of costs of additional improvements including work for which a Grading Permit must be obtained. C. Revisions to Approved Tentative Subdivision Nap: Any substantial revisions (i. e. street alignments, pad sizes, pad elevation changes in excess of two feet) to approved tentative subdivision taps shall require City Council approval. A fee of $695.00, not including any required planning fees, shall be required for any request for any such application of tap revision. d. General Provisions: The number of plan checks covered by the above described fees shall be limited to three. The third plan submittal shall be checked to confirm that said plan submittal is correct and complete. Any additional plan checking efforts required to approve said plans shall be subject to additional fees based upon Actual Cost plus City overhead. • All fees shall be paid at the time of submitted. Exhibit 'B' Page 2 If the Actual Cost (including the City overhead) of sap checking exceeds the total deposits, the developer shall pay the Actual Cost (including City overhead) to the City. Actual Cost shall include: staff labor costs (plus City overhead) and /or contract labor costs (plus City overhead), plus reimbursable expenses (i. e. blueprintinq reproduction, etc.). 3. INSPECTION a. Subdivision and other Major Isurovement Construction Inspection: Actual Cost, including City overhead. A refundable fee deposit shall be paid based upon the Fee Schedule set forth in Section 5 of this Exhibit. b. Subdivision Time Extension of Isprovesent Agreesent: A $411.00 processing fee, plus a refundable deposit of 101 of the fee deposit made under 3a above. The Time Extension deposit shall be collected for the purpose of off setting all costs associated with the requested time extension. Any costs associated with a time extension shall not be charged to the remaining portion of the inspection deposit. Upon cospletion and acceptance of the improvements, any balance remaining after deducting the Actual Costs of inspection (including City overhead) shall be refunded to developer. In the event Actual Cost exceeds available deposit funds, the developer shall pay balance due upon receipt of invoice therefor. C. Deferred Construction Agreement: A fireo fee of 5411.00 shall be required for processing this agreement. d. Guarantee Period Inspection: Actual Cost, including City overhead. A fee deposit of $1,000.00. Upon acceptance of improvements after guarantee period, any balance remaining after deducting Actual Cost of inspection (including City overhead) shall be refunded to the developer. In the event Actual Costs exceed the $1,000.00 deposit, developer shall pay the balance due upon receipt of invoice therefor. 4. GEOLOGY AND SOIL ENGINEERING NJ-VIEW The fees set forth below shall be required for the review and processing of geology and soil engineering reports by outside geotechnical consultants, when and if such review is required by the City Engineer as determined by City or State quidalines: GeotechnicLll Single lot $1600.u( 2 -6 lot subdivision $210[).0( 7 -50 lot subdivision S3000 M Subdivision over 50 lots $3000.0( - for each lot over 50 S 200.N Geology $1600.00 $2100.00 $3000.00 $3000.00 $ 200.00 Special submittal, investigations, reports, or reviews will require deposits based on the actual or anticipated actual cost including City overhead. The above fees will cover one review and one follow - up review. Fees for additional reviews are to pa)d on a actual time basis plus City overhead. Exhibit 'B' Page 3 M FEE SCHEDULE The following schedule shall be used to calculate the xap Checking Fee (Paragraph lb), the Plan Checking Fee (Paragraph 2a) and the Inspection Fee Deposit (Paragraphs 3a). Said fee schedule is based upon the estizate of inprovetent costs. 1'nroveoent Costs ($) Deposit 50 or less 51 - 0 - 999 420.00 201 - 300 1,000 - 9,999 300.00 + 15% of cost over 1,000 10,000 - 49,999 1,650.00 + 10% of cost over 10,000 50,000 - 99,999 5,650.00 5% of cost over 50,000 100,000 - 999,999 8,150.00 + 2% of cost over 100,000 1,000,000 and over 26,150.00 0 of cost over 1,000,000 6. GRADING PERMIT AND PLAN CHECKING FEE SCHEDULE QUANTITY CUBIC YARDS 50 or less 51 - 100 101 - 200 201 - 300 301 - 400 401 - 500 501 - 600 601 - 700 701 - 800 801 - 900 901 - 1,000 1,001 - 2,000 2,001 - 3,000 3,001 - 4,000 4,001 - 5,000 5,001 - 6,000 6,001 - 7,000 7,001 - 8,000 8,001 - 9,000 9,001 - 10,000 10,001 - 20,000 20,001 - 30,000 30,001 - 40,000 40,001 - 50,000 50,001 - 60,000 60,001 - 70,000 70,001 - 80,000 80,001 - 90,000 90,001 - 100,000 100,001 OR ]1BOti E PLAN CHECK FEES 38.00 59.00 86.00 112.00 140.00 167.00 193.00 221.00 249.00 277.00 292.00 292.00 292.00 292.00 292.00 292.00 2.92.00 292.00 292.00 292.00 312.00 333.00 353.00 374.00 395.00 415.00 436.00 456.00 4.17.00 Note A INSPECTION FEES ($) 41.00 62.00 X9.00 116.00 144.00 i -1 1.00 1 49. 00 216.00 23.00 2.51.00 3+8.00 3 Q. 00 iti5.00 4� 11.00 4. ?5.00 418.00 4'1.00 445.00 518.00 6:0.00 '6.00 ,0. 00 934.00 1,O 18.00 1,143.00 1,247.00 1,3`)1.00 1, 4`,5.00 No'e B TOTAL 79.00 121.00 175.00 228.00 284.00 338.00 492.00 447.00 502.00 558.00 600.00 624.00 647.00 669.00 693.00 717.00 740.00 763.00 787.00 810.00 922.00 1,059.00 1,183.00 1,308.00 1,433.00 1,558.00 1,683.00 1,807.00 1,932.00 Exhibit 'B' Page 4 6. GRADING PERMIT AND PLAN CHECKING FEE SCHEDULE (Cont.) Motes: A = $477.00 for the first 1.00,000 cubic yards, plus $10.00 for each additional 10,000 cubic yards or fraction thereof. B = $1,455.00 for the first 100,000 cubic yards, plus $32.00 for each additional 10,000 cubic yards or fraction thereof. 7. ADDITIONAL GRADING PLAN CHECKING / INSPECTION FEES a. Time Extension Fee: $103.00 time extension fee will be required for each time extension of up to six months. b. Change Order Fee: 1) Minor (Staff Review Only): An additional plan checking and /or inspection fee, as required, based upon the amount of earth subject to the proposed change, calculated per the fee schedules set forth ;.n Section 6 of this Exbibit. 2) Major (City Council Action Required): An additional submittal fee of $500.00, plus an additional grading plan checking and inspection fee, based upon the amount of earth subject to the proposed change, calculated per the fee schedules set forth in Section 6 of this Exhibit. C. Exception for Subdivisions and other Major Improvements. Grading Permit and Plan Check fees do not apply to subdivisions and other major improvements, inasmuch as the actual costs of plan checking and inspection have been included in the final plan checking and construction inspectior fees d. 1119gal Grading Fees 200% of the applicable Grading Permit fee, plus City overhead, will be charged for any gradinq project undertaken without a gradinq permit that is in violation of the Grading Ordinance. 8. CERTIFICATES Issuance of Certificate of Compliance: 5343.0u1 per parcel (fixed feel Exhibit 'B' Page 5 9. OTHER The fee for records search and be the total cost to the City determined by the Director of applicable hourly rate(s). 10. APPEAL FEE other services for Which no specific fee is otherwise specified shall including City overhead of any time spent retrieving said records as Public Works. Time shall be in 1/4 hour increments at the then Any appeal of a decision of the City Engineer regarding the interpretation or application of the City's Engineering Standards or this fee schedule shall be accompanied by a deposit of $500.00. The amount of the Appeal Pee shall be actual cost plus City overhead. o, rJ Jam`+ MOORPARK 799 Moorpark Avenue Moorpark. California 93021 (805) 529 -6864 STATE OF CALIFORNIA ) COUNTY OF VENTURA ) ss. CITY OF MOORPARK ) I, Lillian E. Kellerman, City Clork of California, do hereby certify under PE the foregoing Resolution No. _14.1 -8 ,:-, City Council of the City of Mo :�rpJlr E: the 29t1i day of June the same was adcpted by the fc,l.owinq the City of Moorpark, malty of perjury that .._ was adopted by the .it a meetinq held on 1992, and that vote: AYES: i lrnernbers MontAl -'1. 1 v, I vrE' 1al ley, miti Mavor L;iwrrason NOES: No[IL' ABSENT: ("(11mc i l m1•mher Wozni•ih ABSTAIN: No !)c WITNESS my hand and thr olkicIa1 sea] of said City this 20th dry} of _Jule_ 1092. __� ._ /(,.. � f / �! •etc — 1 Kel ] 6rma :� c c•I,rt. ^ o PAW C: AWW-SON J17 N It, .�I I 1.1 x".•11 1 HNAHIY f.1 •I W( AI � +