Loading...
HomeMy WebLinkAboutRES CC 1997 1306 1997 0416RESOLUTION NO. 97- 1306 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, APPROVING THE MITIGATED NEGATIVE DECLARATION AND ADOPTING A MITIGATION MONITORING PROGRAM FOR THE SPRING ROAD BRIDGE REPLACEMENT PROJECT WHEREAS, public notice of the availability of the draft Mitigated Negative Declaration and Initial Study for the Spring Road Bridge Replacement Project was provided in compliance with the California Environmental Quality Act (CEQA) , Division 13 of the Public Resources Code of the State of California, and the State CEQA Guidelines; and WHEREAS, the draft Mitigated Negative Declaration and Initial Study for the Spring Road Bridge Replacement Project was circulated for public review from January 22, 1997, to February 24, 1997, in compliance with Section 15073 of the State CEQA Guidelines; and WHEREAS, all comments received, as well as the City's responses to substantive comments, have been incorporated into the draft Mitigated Negative Declaration; and, WHEREAS, prior to approving the Spring Road Bridge Replacement Project, the City Council has considered the proposed Mitigated Negative Declaration and Mitigation Monitoring Program, together with comments received during the public review process; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, DOES RESOLVE AS FOLLOWS: SECTION 1. The City Council hereby finds that the Mitigated Negative Declaration for the Spring Road Bridge Replacement Project reflects the independent judgment of the City of Moorpark, as lead agency. SECTION 2. The City Council hereby finds that the Mitigated Negative Declaration for the Spring Road Bridge Replacement Project has been completed in compliance with CEQA and the City's CEQA Procedures. SECTION 3. The City Council hereby approves the Mitigated Negative Declaration for the Spring Road Bridge Replacement Project and finds, on the basis of the Initial Study and the comments received during the public review period, that there is no substantial evidence that the Project will have a significant effect on the environment. DST c: \1- m \envir \spr- bry.re; Resolution No. 97- 1306 Page 2 SECTION 5. The City Council hereby adopts a Mitigation Monitoring Program (attached) for the Spring Road Bridge Replacement Project. PASSED, APPROVED AND ADOPTED TH ATTEST: h-illian E. Hare City Clerk Attachment: Spring Road f Monitoring Pr DST c: \1- m \envir \spr- brg.res 1 A APRIL , 1997. y or moorpar ent Project Mitigation Spring Road Bridge Replacement Mitigation Monitoring Program Mitivation Monitoring Program - Page 1 Implementation Monitoring Verification of Com liance Phase Implementor Verification Phase Frequency Monitor Signatures Date Mitigation Measure 1. Prior to approval of the final design, the final Final Design Design Final Design Design/ Once/ City design plan(s) for the project shall be Engineer Approval Construction Periodic Engineer submitted to the City Geologist/Geotechnical Engineer for review. The final plan(s) shall incorporate into project design the recommendations made in the geotechnical studies prepared by Leighton and Associate6 Inc. and AP Engineers for the project. Further field investigation to verify existing boring data shall also be conducted prior to final design. The recommendations shall be incorporated into the design. 2. Prior to initiation of construction activities, Final Design Design Final Design Design/ Periodic Director one of the following two measures shall be Engineer Approval Construction of Public implemented, if determined to be necessary Works by CALTRANS and the City Traffic Engineer: 1) modify the intersections of Tierra Rejada Road/Los Angeles Avenue and SR- 23/Tierra Rejada Road by temporary re- striping, signal modification to lengthen the time period for turn movements, or temporary signage that permits revised turn movements during the time period of bridge closure; or 2) delay bridge construction until Science Drive (located immediately east and parallel to Spring Road) is constructed between Los Angeles Avenue and Peach Hill, or Tierra Rejada Roads. Mitivation Monitoring Program - Page 1 Spring Road Bridge Replacement Mitigation Monitoring Program (Continued) Mitieation Monitoring Program - Page 2 Implementation Monitoring Verification of Com fiance Phase Implementor Verification Phase Frequency Monitor Signatures Date Mitigation Measure 3. Prior to approval of the final bridge design, Final Design Design Final Design Design/ Periodic City the City shall implement one of the following Engineer Approval Construction Engineer three measures: 1) prepare a plan to provide and temporary access for emergency vehicles Director across the Arroyo Simi channel during bridge of Public closure. This plan shall be subject to the Works review and approval of the Department of Public Works and the Moorpark Police Department; 2) create an additional temporary beat to include Report Districts 5112, 5126, and portions of 5110 south of the Arroyo Simi. This beat should be manned a minimum of 16 hours a day, seven day a week; or 3) delay bridge construction until Science Drive (located immediately east and parallel to Spring Road) is constructed between Los Angeles Avenue and Peach Hill, or Tierra Re'ada Roads. 4. A minimum of 45 days prior to construction, Final Design Design Final Design 45 days prior Once Director the City shall provide notification to the Engineer Approval to of Public Moorpark Unified School District, the Construction Works County Superintendent of Schools, the Ventura County Fire Protection District, the Moorpark Police Department, and the local ambulance service. The notification shall include the date when Construction/Bridge Closure will begin and the anticipated construction duration. 5. Construction activities shall be limited to Construction Construction Construction Construction Periodic City between the following hours: 7 a.m. and 7 Manager Bid Approval Engineer p.m. Monday through Saturday. No work is to be accomplished on Sunday and federal holidays. Mitieation Monitoring Program - Page 2 Spring Road Bridge Replacement Mitigation Monitoring Program (Continued) Mitigation Monitoring Program - Pave 3 Implementation MonitorinR Verification of Compliance Phase Implementor Verification Phase Frequency Monitor Signatures Date Mitigation Measure 6. Construction equipment shall be fitted with Construction Construction Construction Construction Periodic City modern sound - reduction equipment. Manager Bid Approval Engineer 7. Temporary perimeter barriers shall be used Construction Construction Construction Construction Periodic City when construction activities are within 200 Manager Bid Approval Engineer feet of any noise - sensitive uses, such as residences, if the noise level is above 65 dBA at the property line. S. Prior to the approval of the final design, the Final Design Design Final Design Design/ Once/ City final design plan(s) for the project shall be Engineer Approval Construction Periodic Engineer submitted to the Department of Public Works and and the City Engineer for review and Director approval. The final plans shall depict of Public infrastructure modifications/ utility line Works relocations due to project implementation. and These modifications /utility line relocations Ventura shall be consistent with the results of County negotiations with affected utility entities. Flood Control District Mitigation Monitoring Program - Pave 3 h�lra; 4 1 Zil 799 Moorpark Avenue Moorpark, California 93021 (805) 529 -686: STATE OF CALIFORNIA ) COUNTY OF VENTURA ) ss. CITY OF MOORPARK ) I, Lillian E. Hare, City Clerk of the City of Moorpark, California, do hereby certify under penalty of perjury that the foregoing Resolution No. 97- 13.06 was adopted by the City Council of the City of Moorpark at a meeting held on the 16th day of APRIL 1997, and that the same was adopted by the following vote: AYES: COUNCILMEMBERS EVANS, TEASLEY, WOZNIAK, AND MAYOR HUNTER NOES: NONE ABSENT: COUNCILMEMBER PEREZ ABSTAIN: NONE WITNESS my hand and the official seal of said City this 17th day of APRIL , 1997.