HomeMy WebLinkAboutRES CC 2002 1935 2002 0123RESOLUTION NO. 2002 -1935
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF MOORPARK, CALIFORNIA, CERTIFYING THE
FINAL ENVIRONMENTAL IMPACT REPORT (SCH-
1994081075) AS COMPLETED IN COMPLIANCE WITH
THE CALIFORNIA ENVIRONMENTAL QUALITY ACT,
FOR THE NORTH RANCH AT MOORPARK PROJECT:
GENERAL PLAN AMENDMENT NO. 99 -01, ZONE
CHANGE 99 -01, VESTING TENTATIVE TRACT NO.
5187, AND DEVELOPMENT AGREEMENT 2001 -01, ON
THE APPLICATION OF WEST POINTE HOMES
WHEREAS, an application has been filed by West Pointe Homes
for the North Ranch at Moorpark project, consisting of General
Plan Amendment 99 -01, Zone Change 99 -01, Vesting Tentative Map
No. 5187 and Development Agreement 2001 -01 for an approximately
350 acre site located within the City of Moorpark, Ventura
County, California, northerly of Casey Road, and west of Walnut
Canyon Road, and incorporating more or less Assessor Parcel
Numbers: 500 - 260 -025; 500 - 260 -045; 500 - 260 -075; 500 - 260 -085;
500 - 260 -095; 500 - 270 -090; 500 - 270 -140; 500 - 270 -155; 500 - 270 -165;
and
WHEREAS, the Final Environmental Impact Report (FEIR) for
the North Ranch at Moorpark Project (State Clearinghouse No.
SCH- 1994081075) provides an environmental assessment of the
proposed project in accordance with the California Environmental
Quality Act (CEQA) , Division 13 of the Public Resources Code of
the State of California, and the State CEQA Guidelines; and
WHEREAS, public notice and availability and distribution of
the Draft EIR was provided in compliance with CEQA; and
WHEREAS, public notice having been given in time, form, and
manner as prescribed by law, the Planning Commission considered
all comments related to the Draft EIR and the responses thereto,
at public hearings for the Draft EIR at its September 11,
October 23, November 13 and 27, December 11 and 19, 2000
meetings and reached its decision to recommend certification of
the Final 'EIR and approval of the Specific Plan project at its
meeting of December 19, 2000, and did provide such
recommendation to the City Council of the City of Moorpark in
Planning Commission Resolution No. PC- 2000 -401; and
WHEREAS, public notice having been given in a time, form,
and manner prescribed by law, the City Council held public
Resolution 2002 -1935
Page 2
hearings on the North Ranch at Moorpark development project on
October 3 and 17, November 7, December 5, December 19, 2001, and
January 16, and 23, 2002, and received public testimony on the
Final EIR and the proposed project at those public hearings, and
closed the public hearing on the EIR on January 23, 2002; and
WHEREAS, in the course of its environmental review, the
City Council discussed alternatives for development design
within the project with the applicant that would provide
additional mitigation through the project design, and did
require said changes to be made in the design of the land plan.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That the Final EIR for the North Ranch at
Moorpark development project (EIR SCH# 1994081075), as on file
within the Department of Community Development, and incorporated
by reference, has been completed in compliance with CEQA, the
CEQA Guidelines, and the City's CEQA Procedures.
SECTION 2. That the Final EIR was presented to the City
Council as the decision - making body and the Council reviewed and
considered the information contained in the Final EIR prior to
approving the project.
SECTION 3. That the Final EIR reflects the lead agency's
independent judgment and analysis.
SECTION 4. That the City Council finds that the North Ranch
at Moorpark development project Final EIR adequately addresses
all issues raised after the close of the public review period
and prior to the close of the public hearing on the project, and
that no new significant environmental impact has been
identified, nor has there been identified any feasible project
alternative or mitigation measure considerably different from
others previously analyzed, and that the identified adverse
environmental impacts can be mitigated to less than significant.
The City Council further finds that prior to the approval of the
development project a statement of overriding considerations
shall not be required to approve the project as all identified
potentially adverse environmental risks associated with the
project have been mitigated to less than the class 1 level, and
that the Mitigation Monitoring and Reporting Program for the
Resolution 2002 -1935
Page 3
project provides for appropriate levels of oversight and
compliance and is hereby adopted and included as Exhibit "A" to
this resolution.
SECTION 5. The City Council hereby designates the Office of
the City Clerk and the Community Development Department as the
custodians of the records constituting the record of proceedings
upon which its decision has been based. Original resolutions
along with one copy of the attachments referenced therein shall
be deposited within the Office of the City Clerk. The Community
Development Department shall be designated the repository and
archive for all historical and active materials related to the
West Pointe Homes North Ranch at Moorpark project.
SECTION 6. The City Clerk shall certify to the adoption of
this resolution and shall cause a certified resolution to be
filed in the book of original Resolutions.
PASSED AND ADOPTED this 2:
ATTEST:
C �
Deborah S. TraffenstYdt, City Clerk
Attachment: Exhibit "A" - Mitigation Monitoring and Reporting
Program
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Mitigation Measures Incorporated Into the Project Description
1. Habitat Enhancement Plan - Prior to issuance of a zoning
The applicant shall complete
Prior to issuance of a zoning
Verification by
clearance for grading permit, the Director of Community
and submit a Habitat
clearance for a grading permit.
Community
Development shall approve a Habitat Enhancement Plan
Enhancement Plan prior to
Development
which shall be integrated into the Landscape Plan for the
issuance of grading permits.
Director.
project. The Plan shall include a provision requiring periodic
monitoring of the enhancement area and a means of
Periodic monitoring of the
Continuous during project
Verification by
enforcement should unauthorized disturbances occur. The
enhancement area shall be
grading.
qualified biologist
intent of the Plan would be to protect on -site natural systems,
completed by a qualified
trees and resources and to devise methods for integrating
biologist during construction
Date Approved:
planting suitable for recreational activities into the Landscape
activities. Monitoring
Plan. The Plan shall also provide guidance regarding
frequency shall be in
revegetation of wetland /riparian areas that will be disturbed
compliance with approved
by construction. The advice provided in this Plan should
Habitat Enhancement Plan.
apply to all existing or created on -site oak woodlands, riparian
areas, detention basins and fuel modification zones. The
purpose of this plan shall be to increase the biological
carrying capacity of these areas.
City of Moorpark 01//23/2002 Resolution 2002-1935
Page 4
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
M auon Monitoring and
Reporting tiro ram — West
Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Prior to issuance of a zoning
Compliance Agent
2. Prior to issuance of a Zoning Clearance for occupancy of the
homes adjacent to the Open Space, fencing
The applicant shall install
Verification by
of sufficient
height and design shall be constructed between the edge of
approved hedgerow or
fencing at the edge of the fuel
clearance for a grading permit.
Community
the fuel modification zone and the natural areas to prevent
modification zone and the
Development
Director.
humans and domestic animals from entering open space
natural areas for the
habitat areas. The Director of Community Development may
purposes of delineating open
Date Approved:
require the fencing to be constructed earlier if needed to
space boundaries.
protect any open space area during construction activates.
Final design and height shall be subject to the review and
approval of the Director of Community Development and shall
be consistent with criteria establish by the California
Department of Fish and Game and /or Army Corps of
Engineers. Fencing will not be placed within the jurisdictional
areas of the site unless required by those agencies.
3. Pets and other domestic animals shall be prohibited from the
Pets and animals are not
Continuous
Code enforcement -
remaining open space habitat areas and in any revegetation
allowed in open space areas
Animal Control
areas on the project site unless restrained by leash and
and in revegetation areas
accompanied at all times by the owner or responsible party.
unless on leash.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 5
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. The CC &R's shall contain provisions prohibiting domestic
animal, agricultural and motorized vehicle use in the
CC and R's shall prohibit
domestic animal, and
Continuous. Signs must be
installed
Verification by
preserved designated natural open space areas, except that
motorized vehicle use in
prior to issuance of
zoning clearance for construction
Community
Development
horses, non - motorized vehicles and pedestrians are allowed
preserved natural open space
of first residential unit.
Director.
on designated trails. Tree houses shall not be constructed in
areas. Tree houses shall not
remaining trees within the natural open space areas of the
be constructed in remaining
Date Approved:
site. Interpretative signs shall be constructed and placed in
trees within the natural open
appropriate areas, as determined by a qualified biologist, that
space areas of the site.
Recipient of land
explain the sensitivity of natural habitats and the need to
Appropriate signage shall be
donation shall be
minimize impacts on these natural areas prior to the issuance
constructed delineating
responsible for
of Zoning Clearance for construction of the first residential
sensitive habitat areas.
monitoring.
dwelling unit. The signs are required to state that they are
entering a protected natural area and that all pedestrians
A qualified biologist shall
must remain on designated trails, all pets are restrained on a
monitor the open space area
leash, and that it is illegal to harm, remove, and /or collect
to prevent unauthorized
plants and /or animals.
intrusion.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 6
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Miti ation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
5. Plants listed in Table 4 -2 of the project EIR shall not be
The Applicant shall not
After review and approval of
Verification by City
planted within the common landscaped areas of the proposed
incorporate any invasive plant
Landscape Plan, and Final
Landscape Architect
site plan. This table shall be included within the CC &R's to
species into the proposed
Inspection an annual inspection
and designated HOA
notify and educate homeowners. In addition, a qualified
landscaping areas.
shall be ongoing.
biologist.
botanist, who shall recommend appropriate provisions to
prevent other invasive plant species from colonizing
Date Approved:
remaining natural areas, shall review the landscaping plans
within common areas of the project. These provisions may
include the following: (a) review and screening of proposed
plant palette and planting plans to identify and avoid the use
of invasive species; (b) weed removal during the initial
planting of landscaped areas; and (c) the monitoring for and
removal of invasive plant species as part of ongoing
landscape maintenance activities. A qualified botanist shall
determine the frequency and method of monitoring for
invasive species. These monitoring activities shall be
included as a component of the C,C and R's.
6. Lighting - All lighting along the perimeter of natural areas,
All lighting along the
After review and approval of
Initial review and
particularly street lamps, shall be downcast luminaries and
perimeter of natural areas,
Lighting Plan, and Final
approval, and field
shall be shielded and oriented in a manner that will prevent
particularly street lamps, shall
Inspection an annual inspection
inspection by City
spillage or glare into the remaining natural and open space
be downcast luminaries and
shall be ongoing.
Lighting Consultant.
areas. The City shall approve final lighting orientation and
shall be shielded and oriented
Subsequent
design. All lighting proposed will need to be consistent with
in a manner that will prevent
inspections by Public
Chapter 17.30 of the Municipal Code.
spillage or glare into the
Works Department.
remaining natural and open
space areas.
Date Approved:
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 7
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Geologic and Seismic Hazards
1. Prior to recordation of the Final Map, initiation of rough
The applicant or subsequent
Prior to issuance of a zoning
Verification by City
grading, or issuance of any subsequent development
developers shall contract with
clearance for a grading permit.
Engineer
permits, the applicant or subsequent developers shall
an engineering geologist and
contract with an engineering geologist and geotechnical
geotechnical engineer to
Date Approved:
engineer to quantify the engineering properties of the on -site
quantify the engineering
soil materials, to assess the potential for weak soils or
properties of the on -site soil
bedding layers which may affect cut and /or natural slopes,
materials, to assess the
and to verify that grading planned within landslide areas will
potential for weak soils or
be remediated to result in an increase in landslide stability
bedding layers which may
consistent with factors of safety approved by the City's
affect cut and /or natural
consulting Geotechnical engineers. This geotechnical study
slopes, and to verify that
shall, as deemed necessary by the City Engineer and
grading planned within
consulting City geologist and geotechnical engineer, further
landslide areas will be
assess slopes within or adjacent to proposed residential
remediated to result in an
development areas (depending on the final configuration of
increase in landslide stability
proposed individual residential parcels). Further assessment
consistent with factors of
'
must also address stability and mitigation measures for
safety approved by the City's
slopes within residential areas, basins, and the water tank
consulting Geotechnical
site and access road, as well as potential off -site impacts
engineer prior to issuance of
along access corridors. The findings and recommendations
grading permit.
of the geotechnical assessment shall be incorporated into
the final design for both the residential and nonresidential
components of the project.
City of Moorpark 01//23/2002 Resolution 2002-1935
Page 8
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
2. Unless determined otherwise by subsequent geotechnical
Landslides shall be removed
Continuous during grading
Verification by City
studies, landslides shall be removed and recompacted
and recompacted during
operation.
Engineer
during grading. Alternatively, landslides or unstable slopes
grading.
can potentially be stabilized by constructing buttress or
Date Approved:
stabilization fill slopes to reduce their potential for future
downslope movement. All cut and fill slopes, foundations
and structures, shall be designed and constructed to comply
with Chapter 70 of the Uniform Building Code (UBC) and
applicable City and /or Country Grading Ordinances.
Modifications to these standards shall be permitted only with
the written concurrence of the City Engineer and the City's
consulting geologist.
3. The applicant, or subsequent developers, shall contract with
An engineering geologist
Continuous during grading "cut"
Verification by the
an engineering geologist to study any unanticipated faults
shall be on -site during the
or removal of portions of the
City Engineer.
exposed during grading to detect any evidence of possible
grading operation to assess
grading operation.
recent activity. Full disclosure of the location and
any unanticipated faults
Date Approved:
characteristics of the on -site fault shall be included as a
exposed during grading.
component of the project's escrow package. No structure
Remediation shall follow the
should be placed within 50 feet of any fault trace which
procedures contained in the
exhibits recent activity. An engineering geologist shall define
approved grading plan and
final grading requirements for residential and recreational
soils report.
facilities. All geological recommendations shall be reviewed
and approved by the City Engineer and the City's consulting
Escrow package shall
One time activity during escrow
Verification by
geologist. Foundation designs in areas where fault traces
disclose the location and
package preparation.
Community
are identified but deemed inactive should address enhancing
characteristics of the on -site
Development
the stability of homes in the event minor movement occurs
fault.
Director.
as a secondary effect of ground shaking.
Date A roved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 9
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. All habitable structures shall be designed to accommodate
Habitable structures shall be
Prior to issuance of building
Same as (3) above
structural impacts from 0.128 ground acceleration and a
designed to withstand seismic
permits
maximum credible earthquake event of magnitude 7.6
events as required by the
Date Approved:
(Richter) or to another standard factor of safety if other
Uniform Building Code.
standards are deemed applicable to this project by the City
Engineer and City geotechnical engineer.
5. Prior to the recordation of the Final Map, the applicant, or
The applicant or subsequent
Prior to recordation of the final
Same as (3) above.
subsequent developers, shall contract with an engineering
developers shall contract with
map.
geologist to prepare grading recommendations, foundation
an engineering geologist to
Date Approved:
design criteria, and other recommendations regarding
prepare grading
detailed project design. As a component of required
recommendations, foundation
subsequent geologic studies, a soils engineer shall evaluate
design criteria, and other
the condition of alluvium and unconsolidated soils.
recommendations regarding
Relatively loose soils or alluvium shall be densified or
detailed project design.
removed and recompacted prior to placement of structures
upon such soils. Other mitigation measures shall be
incorporated into the final project design as required by the
geological assessment. All geological recommendations
shall be reviewed and approved by the City Engineer and
the City's consulting geologist.
City of Moorpark 01//23/2002 Resolution 2002-1935
Page 10
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
6. Prior to issuance of grading permits, the Director of
The Director of Community
Prior to issuance of a zoning
Verification by
Community Development and City Engineer shall review the
Development and City
clearance for a grading permit.
Community
project's grading plan to ensure conformance with contour
Engineer shall review the
Development
grading design criteria consistent with recommendations in
project's conformance with
Director and the City
the City's Hillside Management Ordinance. Grading permits
contour grading concept
Engineer.
shall not be issued until 40 scale grading plans have been
design criteria consistent with
developed that incorporated contour grading techniques.
recommendations in the
Date Approved:
The project shall be constructed in accord with grading plans
City's Hillside Management
approved by the City Engineer and the Director of
Ordinance
Community Development.
7. Prior to issuance of a grading permit, a paleontological
A paleontological mitigation
Prior to issuance of a zoning
Verification by
mitigation plan outlining procedures for paleontological data
plan outlining procedures for
clearance for a grading permit.
Community
recovery shall be prepared and submitted to the Director of
paleontological data recovery
Development
Community Development for review and approval. The
shall be prepared and
Director.
development and implementation of this program shall
submitted to the Director of
include consultations with the applicant's engineering
Community Development for
Date Approved:
geologist. The monitoring and data recovery should include
review and approval.
periodic inspections of excavations to recover exposed fossil
materials. The cost of this data recovery shall be limited to
A qualified paleontological
Continuous during grading
Verification by
the discovery of a reasonable sample of available material.
consultant shall be on site
activities.
Community
The interpretation of reasonableness shall rest with the
during all grading activities
Development
Director of Community Development.
and shall recover and curate
Director.
all significant remains in
conformance with the
approved miti ation plan.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 11
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Air Quality
1. The project applicant has agreed to incorporate an Air
The project applicant will
Prior to issuance of a zoning
Verification by City
Emissions Mitigation Plan into the Project Description. The
develop an Air Emissions
clearance for a grading permit.
Engineer and
mitigation measures in this Plan presented in the Project
Mitigation Plan. This plan will
Director of
Description (Chapter 4), will offset the air quality effects of the
include the Air Quality
Community
project to a considerable degree. However, because
mitigation measures listed in
Development.
emissions of ROC, NOX and dust during construction grading
Chapter 4 and Chapter 7 of
would be significant, the following additional construction
the EIR.
Date Approved:
mitigation measures are required to be incorporated in the
construction program:
City of Moorpark 01//23 /2002 Resolution 2002 -1935
Page 12
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
• Equipment not in use for more than ten minutes should be
The project applicant will
Continuous during all portions of
Verification by City
turned off.
follow the Air Emissions
grading and through completion
Engineer and City
• The fuel injection grading of all diesel engines used in
Mitigation Plan as outlined in
of construction.
Building Inspector.
construction equipment should be retarded two degrees from
the Project Description. The
the manufacturer's recommendation.
applicant will incorporate the
Date Approved:
• All diesel engines used in construction equipment should use
use of the 10 additional
high - pressure injectors.
measures outlined herein to
• All diesel engines used in construction equipment should use
minimize air quality impacts.
reformulated diesel fuel.
• Construction grading should be discontinued on days
forecasted for first stage ozone alerts (concentration of 0.20
ppm) as indicated at the Ventura County APCD air quality
monitoring station closest to the City of Moorpark. Grading
and excavation operations should not resume until the first
stage smog alert expires.
• All clearing and grading activities shall cease during periods
of high winds (i.e., greater than 15 miles per hour averaged
over one hour) to prevent excessive amounts of fugitive dust.
• All material transported off -site shall be either sufficiently
watered or securely covered to prevent excessive amounts of
dust.
• All active portions of the site shall be either periodically
watered or treated with environmentally safe dust
suppressants to prevent excessive amounts of dust.
• Facilities shall be constructed and operated in accordance
with the Rules and Regulations of the Ventura County Air
Pollution Control District.
• Large scale construction vehicles and trucks exiting the
project site during the mass grading period shall be required
to have tire wash -downs to minimize the dispersion of dust
onto local streets.
City of Moorpark 01//23/2002 Resolution 2002-1935
Page 13
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
2. Prior to the issuance of a Zoning Clearance for construction
The applicant will contribute
Prior to issuance of Zoning
Verification by
of the first residential unit, the applicant shall be required to
$360,915 to the Moorpark
Clearance for construction of first
Community
make a contribution to the reduction of local and regional air
Traffic Systems Management
residential unit.
Development
quality impacts through the payment of an air quality impact
Fund
Director.
fee to the Moorpark Traffic Systems Management Fund
consistent with the fee recommendations for residential
projects contained in the Ventura County Guidelines to Air
Date Approved:
Quality Impact Analysis. Fees shall be paid for emissions in
excess of the 25- pound - per -day ROC/NO, significance
threshold. Fees shall be paid prior to the issuance of building
permits.
3. The project applicant's contribution to the referenced air
The applicant will contribute
Prior to issuance of Zoning
Verification by
quality fee offset program is estimated to be approximately
$360,915 to the Moorpark
Clearance for construction of first
Community
$360,915. The fee calculations required to implement this
Traffic Systems Management
residential unit.
Development
measure are summarized in Table 7 -7 in the project EIR.
Fund
Director.
The annual cost of reducing ROC is compared to the annual
cost of reducing NO,, The contribution is based on the higher
of the two costs, as off -site TDM funding would result in
Date Approved:
programs that reduce both pollutants. As shown, a total of
$360,915 or $13,093 per pound of NO, would be required to
reduce the operational impacts generated by the proposed
roject to acceptable levels.
City of Moorpark 01//23/2002 Resolution 2002-1935
Page 14
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Groundwater Supplies, Reclaimed and Domestic Water
The applicant shall design an
Prior to recordation of the final
Verification by
Systems and Surface Water Quality
infrastructure plan which
Vesting Tentative Map or any
Community
places all required water,
phase thereof.
Development
1. Prior to approval of the final Vesting Tentative Map or any
sewer, and reclaimed water
Director and City
phase thereof, the proposed infrastructure plan for the
conveyance facilities in
Engineer.
project shall be designed to place all required water, sewer,
Walnut Canyon.
and reclaimed water conveyance facilities in Walnut Canyon.
Date Approved:
The applicant shall obtain all necessary right -of -way and
easements to install the required infrastructure in this
alignment. The City may assist with the acquisition of such
easements.
2. Prior to issuance of a grading permit, the applicant shall
The applicant shall submit to
Prior to issuance of a zoning
Verification by the
submit to the City Engineer for review and approval, an
the City Engineer for review
clearance for a grading permit.
City Engineer
Erosion and Sediment Control Plan. This plan shall be
and approval, an Erosion and
prepared by the applicant and approved by the City Engineer
Sediment Control Plan shall
Date Approved:
prior to issuance of any bulk or mass - grading permit for the
be prepared by the applicant
project. Sedimentation basins and devices for controlling
and approved by the City
storm water flows and reducing erosion shall be constructed
Engineer prior to issuance of
by the applicant or subsequent developers as required by
any bulk or mass - grading
the City and the County Flood Control District. Provisions for
permit for the project.
the construction of the sedimentation basins and erosion
control devices shall be incorporated into the project Erosion
Erosion control measures
Continuous during project
Verification by the
and Sediment Control Plan. If clear and grub operations are
outlined in the approved plan
construction.
City Engineer
to proceed independently of and prior to the issuance of a
shall be implemented and
mass grading permit, adequate temporary erosion control
maintained by the applicant.
Date Approved:
devices will need to be installed prior to initiating clear and
grub.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 15
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
3. Temporary erosion control measures shall be used
Temporary erosion control
Continuous- during all portions of
Same as (2) above.
during the construction process to minimize water quality
measures shall be used
the grading program and
effects. Specific measures to be. applied shall be
during the construction
continuing until final erosion
Date Approved:
identified in the project Erosion and Sediment Control
process to minimize water
control devices have been
Plan. The following water quality assurance techniques
quality effects. Specific
deemed unnecessary by the City
shall be included as deemed necessary by the City
measures to be applied shall
Engineer.
Engineer:
be identified in the project
Erosion and Sediment
• Minimize removal of existing vegetation.
Control Plan. Proper
• Provide temporary soil cover, such as hydro seeding,
maintenance of BMPs shall
mulch /binder and erosion control blankets, to protect
be monitored by City
exposed soil from wind and rain.
Engineer.
• Incorporate silt fencing, berms, and dikes to protect storm
drain inlets and drainage courses.
• Rough grade contours to reduce flow concentrations and
velocities.
• Divert runoff from graded areas, using straw bale, earth,
and sandbag dikes.
• Phase grading to minimize soil exposure during the
October through April storm period.
• Install sediment traps or basins.
• Maintain and monitor erosion /sediment controls.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 16
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. To minimize the water quality effects of permanent erosion
The applicant shall construct
Prior to issuance of Zoning
Same as (2) above.
sources, the following design features shall be incorporated
permanent erosion control
Clearance for first building permit
into the project grading plan to the degree determined
devices to reduce impacts to
for any habitable structure.
Date Approved:
necessary by the project civil engineer. The City Engineer
water quality.
shall review and approve the grading plan to verify
compliance with water quality enhancement features
including:
The HOA shall properly
Continuous
Same as (2) above.
• drainage swales, subsurface drains, slope drains, storm
maintain all private
drain inlet/outlet protection, and sediment traps;
permanent erosion control
• check dams to reduce flow velocities;
devices.
• permanent desilting basins;
• permanent vegetation, including grass -lined swales;
• design of drainage courses and storm drain outlets to
reduce scour.
5. Prior to issuance of a grading permit, the applicant shall
The applicant shall submit to
Prior to issuance of a zoning
Same as (2) above
submit to the City Engineer for review and approval an
the City Engineer for review
clearance for a grading permit.
Urban Runoff Management Plan to address water quality
and approval an Urban
Date Approved:
impacts of the project. The management regime
Runoff Management Plan.
recommended in this Plan shall be the governing document
for the long term maintenance of water quality features
included in the project (e.g., first flush basins and other
The City shall periodically
Continuous
Same as (2) above
facilities). The City shall periodically monitor adherence to
monitor adherence to the
the plans and management guidelines contained in the Plan.
plans and management
The Plan should require periodic analysis of the nutrients in
guidelines contained in the
the reclaimed water and the nutrient and moisture
Plan.
requirements of the grass and other landscaping within any
turf areas in excess of two acres.
Resolution 2002 -1935
City of Moorpark 01//23/2002 Page 17
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
6. Runoff from developed areas should be diverted to detention
Runoff from developed areas
Prior to approval of the final
Same as (2) above.
basins, or underground oil and grease traps or other Best
should be diverted to
Vesting Map or any phase
Management Practices, as determined by the City Engineer.
detention basins, or
thereof.
Date Approved:
These devices should be designed by a registered civil
underground oil and grease
engineer as part of the drainage improvement plans for the
traps or other Best
project. Their design and location should be reviewed by a
Management Practices.
concerned conservation agency such as the California
Department of Fish and Game or an independent biologist,
The basins and traps will
Continuous
prior to approval of the improvement plans by the City
require periodic maintenance
Engineer and Director of Community Development. The
by the HOA.
basins and traps would require periodic maintenance by the
property owner, homeowners association, or other entities.
Same as (2) above.
Provisions shall be made by the applicant to provide for
maintenance in perpetuity prior to Final Vesting Map
approval.
7. The grading permits issued for the development shall require
The applicant shall obtain all
NPDES Permit- Prior to issuance
Same as (2) above.
maintenance schedules for earthmoving equipment and
necessary NPDES related
of a zoning clearance for the
documentation of proper disposal of used oil and other
permits prior to City issuance
initial grading permit.
Date Approved:
lubricants. The applicant shall obtain all necessary NPDES
of the initial grading permit
related permits prior to City issuance of the initial grading
for the project and provide
permit for the project.
evidence of ongoing
Equipment Maintenance -
equipment maintenance .
Continuous during project
construction.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 18
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Drainage, Sediment Transport, and Flood Control Planning
1. Prior to approval of a final map, the applicant shall submit to
The applicant shall submit to
Prior to approval of a final Vesting
Verification by City
the City Engineer for review and approval, a Master
the City Engineer for review
Map.
Engineer.
Drainage and Flood Control Improvement Plan which
and approval, a Master
identifies all required drainage and flood control
Drainage and Flood Control
Date Approved:
improvements necessary to implement the proposed project.
Improvement Plan which
This plan shall be prepared in consultation with the Moorpark
identifies all required
City Engineer. Portions of the improvements that fall within
drainage and flood control
easements or right -of -way dedicated to the Ventura County
improvements necessary to
Flood Control District shall be prepared to the satisfaction of
implement the proposed
the City Engineer and the District. The plan shall identify all
project. No Mass Grading
major improvements and typical drainage facilities for the
shall be permitted until a
project. The capacity, location, and size of all culverts,
Conceptual Master Drainage
collection devices, energy dissipaters, and related
Plan is approved
improvements shall be designed to the satisfaction of the
City Engineer and Ventura County Flood Control District.
Capacity details for the construction of the on -site private
detention basins and the regional flood control basin in
Walnut Canyon shall be included in the Master Plan. All
necessary permits required to implement the Plan shall be
obtained from the Ventura County Flood Control District prior
to City issuance of a permit for mass grading. No mass -
grading permit shall be issued until the Master Plan is
completed and approved. The Master Plan shall identify
improvements that must be completed coincident with the
initiation of mass grading. All improvements shall be
constructed consistent with approved plans.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 19
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
2. Sediment yields in the watersheds within the project
The applicant or subsequent
Prior to approval of the final
Verification by the
boundary shall be computed for pre - development and
developers shall prepare an
Vesting Map, or any phase
City Engineer.
post - development conditions in accord with methods
Erosion and Sediment
thereof.
outlined in Erosion and Sediment Yields in the
Control Plan to address
Date Approved:
Transverse Ranges, Southern California (United States
construction impacts and
Geological Survey, 1978). These estimates of
long -term operational effects
Sedimentation Monitoring -
sediment yield shall be completed prior to initiating final
on downstream environments
Continuous
design of the regional flood control debris /detention
and watersheds. This plan
basin facility situated in the Walnut Canyon Drainage
shall include monitoring and
along the easterly project boundary.
maintenance provisions to
keep sedimentation at
acceptable levels.
3. Prior to issuance of a permit for rough grading the applicant
The applicant or subsequent
Prior to issuance of a zoning
Verification by the
or subsequent developers shall prepare an Erosion and
developers shall prepare an
clearanc6 for a grading permit.
City Engineer and
Sediment Control Plan to address construction impacts and
Erosion and Sediment
Director of
long -term operational effects on downstream environments
Control Plan to address
Community
and watersheds. This plan shall be prepared by a Certified
construction impacts and
Development
Erosion and Sediment Control Professional or a qualified
long -term operational effects
Civil Engineer. Proposed management efforts shall include
on downstream environments
Date Approved:
(but not be limited to) provisions for the use of vegetative
and watersheds. This plan
filtering enhanced by creek bed reconstruction, preparation
shall be prepared by a
of detailed erosion control plans, appropriate use of
Certified Erosion and
temporary debris basins, silt fences, sediment traps and
Sediment Control
other erosion control practices. The proposed plan shall
Professional or a qualified
also address all relevant NPDES requirements and
Civil Engineer and shall
recommendations for the use of best available technology.
contain provisions to ensure
long -term reduction in
sedimentation rates.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 20
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. The Applicant shall agree to fund and /or construct a regional
A regional detention facility
Prior to recordation of the final
Verification by the
detention facility that will adequately mitigate cumulative
shall be funded and /or
Vesting Map, or phase thereof.
City Engineer.
regional drainage deficiencies within the watershed
constructed by the applicant
encompassing the proposed project.
that adequately mitigates
Date Approved:
cumulative regional drainage
deficiencies within the
watershed encompassing the
proposed project.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 21
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Biological and Botanical Resources
1. Prior issuance of building permits and coincident with
The proposed conservation
Conservation Easement - One
Verification by
grading activities, the proposed conservation
easement/conservation
time activity prior to issuance of a
Community
easement/conservation dedication area shall be fenced with
dedication area shall be
Zoning Clearance for grading.
Development
wire (or other fencing as approved by the Director of
fenced with fencing as
Director.
Community Development) to minimize intrusions by non-
approved by the Director of
Trail Dedication — One time
residents. A minimal designated trail system shall be
Community Development) to
activity prior to approval of the
Date Approved:
devised for the easement area which, to the extent feasible,
minimize intrusions. A
final Vesting Map.
avoids or minimizes impacts to stands of native vegetation.
minimal designated trail
The design of the trail system shall preserve, to the extent
system shall be devised for
Trail Maintenance- Continuous
feasible, large tracts of Venturan Coastal Sage Scrub to
the easement area which, to
enhance the potential value of this dedication for wildlife.
the extent feasible, avoids or
The trail system shall be posted indicating penalties for
minimizes impacts to stands
damage to or destruction of wildlife. All motorized vehicles
of native vegetation. Open
shall be prohibited from entering the conservation area.
Space grantee shall be
Prior to the approval of the Final Vesting Map the site plan
responsible for the long -term
shall be revised to include the dedicated trail alignment
maintenance of the trail
across the open space. The trail system shall be constructed
system.
as a minor multi -use trail and access to the area shall
otherwise be restricted. The trail system shall be completed
prior to occupancy of the first dwelling unit.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 22
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
2. Prior to the approval of the Final Vesting Map the applicant or
The applicant shall construct
Prior to issuance of building
Verification by
subsequent owner /developer shall dedicate a trail alignment
a multiuse trail across the
permits for phase one.
Community
across the open space conservation parcel. The trail
conservation dedication area.
Development
system shall be constructed as a minor multi -use trail and
Director.
access to the area shall otherwise be restricted and shall be
completed prior to occupancy of the first dwelling unit.
Date Approved:
3. Disturbed (ruderal) vegetation zones within the conservation
Disturbed (ruderal) vegetation
Prior to occupancy of the last unit
Verification by
easement/conservation dedication area shall be cleaned up
zones within the Open Space
in phase one.
Community
and, to the degree feasible, restored.
Area shall be cleaned up, and
Development
to the degree feasible,
Thereafter, the maintenance of
Director.
restored by the Open Space
the area shall be the responsibility
grantee.
of the open space grantee.
Date Approved:
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 23
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Miti ation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. Prior to issuance of grading permits, a proposed habitat
A habitat restoration plan
Habitat Restoration Plan — Must
Same as (1) above.
restoration plan shall be developed to ensure
shall be developed to ensure
be submitted and approved prior
compensation for the loss of native habitats that will occur
compensation for the loss of
to issuance of a zoning clearance
from project development. This plan may be included in
native habitats that will occur
for a grading permit.
the Landscape Plan for the project or may be prepared as
as a result of project
Date Approved:
a separate document for City review and approval. The
development. The plan will
Maintenance of Restored Area -
habitat restoration plan shall emphasize the selective use
be subject to the review and
On going activity to continue for
of purple needle grass (Stipa pulchra) and other native
approval of the CDFG and
three years, or until the native
grasses in the landscape plan for the property. The plan
ACOE and LISFW.
grasses, riparian corridor. and
shall also require, subject to approval of the Fire
perimeter plantings are
Department, the use of native plants common to Venturan
successfully established.
Coastal Sage Scrub (e.g., Salvia apiana, Salvia
leucophylla, Arfemisia californica, Rhus integrifolia,
Eriogonum fasciculatum, Encelia californica) in upland
areas surrounding the project that are disturbed as a result
of project development (geologic remediation, construction
of fire access roads, etc.). The applicant shall also fund a
program to provide an enhanced riparian canopy within
and around the proposed detention basin consistent with
requirements of the Department of Fish and Game and
Army Corps of Engineers. The restoration shall be
performed in accordance with current best available
restoration procedures. The applicant (or a designee)
shall be responsible for maintaining the restoration areas
for a period of three years or until the native grasses,
riparian corridor, and perimeter plantings are successfully
established.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 24
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
5. The applicant/developer shall deposit with the City funds to
The applicant shall pay to the
Prior to approval of a final map.
Same as (1) above.
be held in trust for open space conservation, acquisition and
City a $25,000 contribution
maintenance. The sum of funds recommended in the EIR as
and participate in the
Date Approved:
an offset to impacts related to rare plant communities is
preservation, protection and
$25,000. This trust fund deposit shall be used at the
enhancement of open space
discretion of the City for purposes consistent with the intents
communities containing
of the biological resources mitigation measures in the EIR
significant plant communities.
addressing impacts to rare plants, restoration of Valley
Needle Grassland, and impacts to endangered species. The
The funds shall be deposited
payment of this fee shall be recognized by the City as full
in the appropriate City fund
compliance with fee deposits for these purposes identified in
for open space conservation,
the EIR. The Open Space Conservation and Maintenance
acquisition and maintenance,
Trust Fund shall be used to protect and restore native habitat
within the City
6. Native plants shall be used in the restoration of areas
The City shall monitor the use
After review and approval of
Verification by City
disturbed by the construction of the project. The City shall
of native plants through
Landscape Plan, and Final
Landscape
monitor the use of native plants through review and approval
review and approval of all
Inspection, an annual inspection
Consultant, HOA and
of all project landscape plans.
project landscape plans.
shall be ongoing
Director of
HOA shall complete annual
Community
inspection and verify
Development.
consistency with approved
landscape plans.
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002-1935
Page 25
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
7. The permanent removal of 10 California walnut trees that are
The permanent removal of 10
Prior to recordation of the final
Same as (6) above
located within the California walnut woodland community,
California walnut trees shall
Vesting Map.
shall be replaced at a 10:1 mitigation ratio by planting 100
be replaced at a 10:1
California walnut trees on the site or in the adjacent
mitigation ratio by planting
Conservation Easement/Conservation Dedication area. The
100 California walnut trees on
Date Approved:
trees should be planted dominantly within the upland areas
the site or in the adjacent
above the detention basin, in upland areas within restored
Conservation
riparian corridors, and in other upland areas within the
Easement/Conservation
Conservation Easement/Conservation Dedication area. Field
Dedication area.
research shall be conducted by a qualified biologist to
determine whether soils, drainage, and compaction of the soil
are suitable for survival of the species in all areas where
restoration is planned. To ensure maximum survival rates,
these replacement trees shall be limited to one - gallon
specimens. If possible, replacement plantings should be
derived from locally harvested native walnuts in the upper
reaches of Walnut Canyon. Otherwise, if nursery stock is
used for restoration, no grafted stock shall be permitted
8. A Tree Removal Permit shall be obtained from the City prior
A Tree Removal Permit shall
Prior to issuance of grading
Verification by
to removal of trees that meet the native oak and mature tree
be obtained from the City
permits.
Director of
criteria within the City's tree ordinance (no. 101). Permits for
prior to removal of trees that
Community
tree removal shall not be issued until (or unless) the project
meet the native oak and
Development and
has been approved by the City. The loss of 30 non - native
mature tree criteria within the
Replacement- prior to issuance of
City Landscape
Peruvian pepper trees, 3 native blue elderberry 5 non - native
City's tree ordinance (no.
building hermits.
Consultant.
blue gum, and 12 non - native tamarisk shall be replaced
101). Replacement quantities
consistent with the City of Moorpark tree ordinance
and maintenance schedule
Monitoring — Continuous
Date Approved:
guidelines.
shall be developed using the
City's tree ordinance
guidelines.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 26
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
9. Prior to grading, the single native oak tree which will be
The single native oak tree
Prior to issuance of a zoning
Verification by
impacted by the project shall be preserved on the site and
which will be impacted by the
clearance for a grading permit,
Director of
shall be protected from any adjacent grading or construction
project shall be preserved on
thereafter on a continuous basis.
Community
operations. The measures that shall be taken to protect this
the site and shall be
Development.
oak tree, and the other remaining protected trees on the site,
protected from any adjacent
shall be provided in the Biological Resources Mitigation Plan
grading or construction
Date Approved:
outlined in the Project Description of the EIR (Chapter 4).
operations.
10. Prior to recordation of the final map the proposed voluntary
The proposed voluntary
Prior to recordation of a final map.
Verification by City
Conservation Easement/Conservation Dedication shall be
Conservation
Engineer and
secured by, at a minimum, (1) an irrevocable conservation
Easement/Conservation
Director of
easement and (2) by a deed restriction. A separate parcel
Dedication shall be secured
Community
shall be created for transfer of the dedicated open space to
by, at a minimum, (1) an
Development.
conservation status. Although the parcel shall be deed
irrevocable conservation
restricted to prevent any future development, a reserved right
easement and (2) by a deed
Date Approved:
for the development of a minimal trail system shall be
restriction. A separate
reserved. The subject parcel shall be designated as
parcel shall be created for
permanent open space on the City's General Plan Land Use
transfer of the dedicated open
Map. I
space to conservation status.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 27
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
11. The applicant shall be required to obtain all Clean Water Act
The applicant shall be
Prior to issuance of a zoning
Verification by City
401 and 404 permits and clearances as administered by the
required to obtain all Clean
clearance for a grading permit.
Engineer.
Army Corps of Engineers and the Regional Water Quality
Water Act 401 and 404
Control Board /State Water Resource Board. These permits
permits and clearances as
Date Approved:
shall be obtained prior to initiating any grading or clear and
administered by the Army
grub activities not covered under the City's grading
Corps of Engineers and the
ordinance. All conditions of the permits and certifications
Regional Water Quality
from these agencies that are designed to minimize impacts to
Control Board /State Water
biological resources and all measures to mitigate for the loss
Resource Board.
of jurisdictional habitats shall be implemented.
Implementation of mitigation designed to offset impacts to
Implementation of mitigation
Monitoring- continuous until
Verification by
areas of federal jurisdiction shall be monitored by the relevant
shall be monitored by the
plantings are reestablished
relevant federal
federal agencies and by the City (under the Environmental
relevant federal agencies
agencies
Quality Assurance Program) for the project.
and by the City (under the
Environmental Quality
Assurance Program) for the
project.
12. A Streambed Alteration Agreement shall be executed with
Streambed Alteration
Prior to issuance of a zoning
Verification by City
California Department of Fish and Game under provisions of
Agreement shall be executed
clearance for a grading permit,
Engineer and
Section 1603 of the California Fish and Game Code prior to
with California Department of
thereafter periodically monitored.
Director of
issuance of grading permits. All conditions of this agreement
Fish and Game prior to
Community
designed to minimize impacts to biological resources and all
issuance of grading permits.
Development.
measures to mitigate for the loss of jurisdictional habitats
shall be implemented. Implementation of mitigation designed
Monitoring shall be the
Continuous until reestablishment
Date Approved:
to offset impacts to areas of state jurisdiction shall be
responsibility of the CDFG
monitored by the Department of Fish and Game and by the
and the City under the EQAP
City (under the Environmental Quality Assurance Program)
program.
for the project.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 28
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
13. Prior to issuance a grading plan, two artificial freshwater
Two artificial freshwater
Prior to issuance of Zoning
Verification by
spring shall be established within the Conservation
spring shall be established
Clearance for a grading permit.
Director of
Easement/Conservation Dedication area in a location that will
within the Conservation
Community
provide maximum potential for long -term use by native
Easement/Conservation
Development.
wildlife. These springs are designed to replace regionally
Dedication area in a location
available water sources that have been destroyed by
that will provide maximum
Date Approved:
cumulative development. The springs are designed to
potential for long -term use by
contribute to the provision of habitat refuges for local
native wildlife.
mammals, birds, and potentially endangered species as well.
Since the water sources for these springs would be artificial,
Monitoring of habitat viability
Continuous until adequate habitat
Verification by City's
riparian plantings within these restoration areas would not
shall be provided shall be
reestablishment.
EQAP monitor.
qualify for mitigation under federal or state permit procedures.
included as a component of
A qualified vertebrate biologist and botanist shall designate
the project's EQAP.
the location of these artificial springs. These artificial springs
shall be maintained to provide year round low flows of
appropriate water volumes (similar to existing springs in the
region). The created spring systems shall be designed to
reproduce the conditions present at the existing natural
springs in the Walnut Canyon area. The springs shall be
appropriately revegetated with native plants and other
streamside plants common in similar settings. The springs
shall not be developed within 700 feet of any proposed trail
system.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 29
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Miti ation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
To partially mitigate impacts associated with disruption of the
Perimeter fencing shall be
Prior to issuance of a Zoning
Verification by the
ecology of surrounding open space, the following mitigation
provided in areas where
Clearance for the first residential
Director of
measures have been recommended:
future residents could obtain
building permit.
Community
access to surrounding
Development.
14. Perimeter fencing, subject to the review and approval of the
private lands.
Director of Community Development, shall. be provided in
Date Approved:
areas where future residents could obtain access to
surrounding private lands.
15. Off road vehicle use on property within the project boundary
Off road vehicle use on
Continuous
Verification by City
shall be prohibited. The CC &R's shall specify fines for
property within the project
Code Enforcement,
unauthorized use of off road vehicles.
boundary shall be prohibited.
Police Department,
Compliance monitoring shall
and the Homeowners
be provided.
Association
Date Approved:
16. The trail system design shall be submitted to the Director of
Trail system design shall be
Prior to issuance of a zoning
Verification by
Community Development for review and approval. The
submitted to the Director of
clearance for a grading permit.
Community
design shall be consistent with the recommendations
Community Development for
Development
contained in the Project Description (Chapter 4) of the EIR.
review and approval. The
Director.
Trail links shall provide with surrounding subdivisions and the
design shall be consistent
regional trail system shall be properly designated and shall
with the recommendations
Date Approved:
prohibit the use of motorized vehicles.
contained in (Chapter 4) of
the EIR.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 30
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
17. Landscaping, lighting, construction practices and
Landscaping, lighting,
Prior to approval of the Final Map.
Same as (16) above.
management of the Conservation Easement/Conservation
construction practices and
Dedication area consistent with best management practices
management of the
Date Approved:
for open space preservation shall be required for this project.
Conservation
These design, construction, and post - construction efforts
Easement/Conservation
shall be consistent with the applicant proposed Biological
Dedication area shall be
Resources Management Plan outlined in the Project
consistent with best
Description (Chapter 4).
management practices.
Impacts to special interest species that will result from loss of
The applicant shall contribute
Prior to issuance of Zoning
Same as (16) above.
habitat will require mitigation. Recommended measures include:
funds to the appropriate
Clearance for the first residential
conservation institution for
unit.
Date Approved:
18. The applicant shall contribute $30,000 to funding endangered
endangered wildlife species
wildlife species breeding, predator trapping, or other support
breeding, predator trapping,
programs undertaken by the US Fish and Wildlife Service or
or other support programs.
by appropriate private, City, or other appropriate
conservation institutions actively seeking to restore the
status, range, or abundance of any of the rare, special
interest, or endangered species that have occurred or have
the potential to occur within the project boundary. This
contribution shall be coordinated with the US Fish and
Wildlife Service. Evidence of contribution approved by the
Service shall be presented to the City prior to the issuance of
building permits. Funding shall be established by
preparation of a research design in consultation with the Fish
and Wildlife Service and the City. (Note: this mitigation
measure concerns offsets to state and federal species of
concern or rare plants and animals and is an independent
mitigation requirement from the City related issues
concerning open space programs).
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 31
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
19. The applicant shall contribute $15,000 towards the City's
Verify deposit of $15,000
Prior to recordation of a Final
Same as (16) above.
sensitive species research and land acquisition program
towards the City's sensitive
Map.
(established as a component of the Open Space Fund
species research and land
Date Approved:
previously referenced). The purposes of this program are to
acquisition program.
study how best to assist in providing adequate marginalized
habitats in areas of urban encroachment for sensitive
species that are predicted to occur within the West Pointe
Homes property and surrounding area. The program shall
include an updated inventory of sensitive species occurring
in the project area. Recommendations shall be made to
provide modifications to the Moorpark General Plan Open
Space, Conservation, and Recreation Element to improve
the accuracy of the existing inventory of native fauna.
Management suggestions designed to permit at least the
marginal survival of native wildlife shall be provided. The
study shall also provide management advice on native fauna
for agencies and private individuals. Provision must be
made for disseminating the results of the study. Research
programs shall be performed only by qualified professional
botanists, wildlife biologists, or other relevant researchers.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 32
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
20. No earlier than 45 days and no later than 20 days prior to
The applicant shall have a
Prior to Issuance of a Zoning
Same as (16) above.
grading /site preparation activities that would occur during the
field survey conducted by a
Clearance for Grading Permit for
nesting /breeding season of native bird species potentially
qualified biologist to
any phase of the project.
Date Approved:
nesting on the site (typically February through August), the
determine if active nests of
applicant shall have a field survey conducted by a qualified
bird species protected by the
biologist to determine if active nests of bird species
Migratory Bird Treaty Act
'
protected by the Migratory Bird Treaty Act and /or the
and /or the California Fish and
California Fish and Game Code are present in the
Game Code are present in
construction zone or within 100 feet (200 feet for raptors) of
the construction zone or
the construction zone. A report of this field survey shall be
within 100 feet (200 feet for
submitted to the Director of Community Development . If
raptors) of the construction
active nests are found, a minimum 50 -foot (this distance may
zone. If active nests are
be greater depending on the bird species and construction
found, the applicant shall
activity, as determined by the biologist) fence barrier (subject
consult with the CDFG and
to the review and approval of the Director of Community
USFW prior to the
Development) shall be erected around the nest site and
commencement of grading.
clearing and construction within the fenced area shall be
postponed or halted, at the discretion of the biological
monitor, until the nest is vacated and juveniles have fledged,
as determined by the biologist, and there is no evidence of a
second attempt at nesting. The biologist shall serve as a
construction monitor during those periods when construction
activities will occur near active nest areas to ensure that no
inadvertent impacts on these nests will occur.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 33
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
21. Should the development of the project proceed as proposed,
Open Space Area shall be
Continuous
Verification by
the entire project area would have degraded wildlife value
managed and maintained by
Community
compared to existing levels of significance. A typical partial
a qualified conservation
Development Director
mitigation for loss of habitat and open space would be setting
agency to ensure
aside essential habitat and open space at a ratio of at least 1
implementation of long -term
acre open space to 1 acre developed land. Provisions for
stewardship program.
such a set -aside have been made in the Project Description.
Final details concerning this conservation program shall be a
portion of the Development Agreement for the project.
The restoration of the riparian area may provide some offset
for the loss of. essential native habitats within the project
boundary. The research programs suggested above may
also contribute to the long -term preservation of remaining
sensitive native habitats in the Moorpark area.
Noise
1. No construction activities shall be permitted before: (a) 7:00
City shall ensure that
a.m. or after 7:00 p.m., Monday through Friday and (b) 9:00
construction is not allowed
Continuous during project
Verification by City
to 5 pm on Saturday. Construction work on Saturdays would
before 7:00 a.m. or after 7:00
construction.
Building and Safety
be permitted with more restrictive hours if complaints from
p.m., Monday through Friday
Department.
adjacent neighborhoods occur. Construction shall not
and 9:00 am to 5pm on
permitted on Sunday or on holidays.
Saturdays. No work on
Date of Approval
Sundays and Holidays is
permitted.
2. Stationary noise sources that exceed 70 dBA of continuous
Noise sources exceeding 70
Continuous during project
Verification by City
noise generation (at 50 feet) shall be shielded with
dBA shall be shielded with
construction
Building and Safety
temporary barriers if existing residences are within 350 feet
temporary barriers or existing
Department.
of the noise source.
residences.
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 34
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
3. Designated parking areas for construction worker vehicles
Adequate construction
Continuous during project
Verification by City
and for materials storage and assembly shall be provided.
vehicle parking shall be
construction.
Building and Safety
These areas shall be set back as far as possible from or
provided with appropriate
Department.
otherwise shielded from existing surrounding rural residential
setbacks.
neighborhoods.
Date Approved:
4. Immediately surrounding property owners shall be notified in
Property owners shall receive
Prior to initiation of grading.
Verification by
writing of construction schedules involving major grading.
proper notification regarding
Director of
grading operations.
Community
Development.
Date Approved:
5. A construction effects mitigation program shall be prepared
The applicant shall prepare a
Prior to occupancy of first phase
Verification by
and submitted to the City prior to occupancy of the first phase
construction effects mitigation
of project buildout.
Community
of project buildout. This program shall protect, to the degree
program prior to occupancy of
Development
feasible, new residents from the impacts of sustained
the first phase of project
Director.
construction on new neighborhoods.
buildout.
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 35
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Fire Hazards and Fire Suppression
1. Prior to the recordation of the Final Map, the applicant shall
The applicant shall retain a
Prior to recordation of the Final
Verification by
retain a certified fire management professional to prepare a
certified fire management
Map.
Community
Fire Hazard Reduction Program; this program shall be
professional to prepare a Fire
Development
prepared in consultation with the County Fire Protection
Hazard Reduction Program;
Department and
District and shall be approved by the City Community
this program shall be
County Fire
Development Director. The certified fire management
prepared in consultation with
Prevention District.
professional shall be familiar with the objectives of fuel
the County Fire Protection
management in wildland -urban interface. A native plant
District and shall be approved
Date Approved:
specialist shall participate in the development of the fuel
only when County fire
management program. The program shall apply to all lands
protection standards have
within 200 feet of the proposed residences comprising the
been met.
project (or as amended by the certified fire professional
based on fuel modification factors acceptable to the County
Fire Protection District).
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 36
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
2. The vegetation management requirements of the Fire Hazard
The vegetation management
Prior to recordation of Final Map.
Verification by
Reduction Program shall be clearly defined. The proposed
requirements of the Fire
Community
West Pointe Homes Homeowners Association (HOA) shall be
Hazard Reduction Program
Development
responsible for implementing this program in perpetuity.
shall be clearly defined. The
Consistency Monitoring-
Department and
Fuel modification zones are proposed to be retained in as
proposed West Pointe Homes
Continuous
County Fire
natural a state as safety and fire regulations will permit. The
Homeowners Association
Prevention District.
zones will be designed by and planted under the supervision
(HOA) shall be responsible
of a landscape architect with expertise in native plant
for implementing and
Date Approved:
materials and habitat restoration, with the approval of the City
monitoring this program in
Community Development Director, to appear as a transition
perpetuity
between the built environment and natural open space. Final
approval of this Program by the County Fire Prevention
District and City Community Development Director shall be
required prior to the recordation of the Final Map.
Appropriate language shall be included on the Final Map
indicating the boundary of all areas of fuel modification
hazard zones.
3. All structures adjacent to open space around the perimeter of
All structures adjacent to
Prior to issuance of building
Same as (2) above
the project shall be designed to satisfy at least a one -hour fire-
open space around the
permits
resistant rating. Such structures shall incorporate fire
perimeter of the project shall
Date Approved:
retardant features including boxed -in eaves, reduced
be designed to satisfy at least
overhangs, double paned windows, convection resistant roof
a one -hour fire- resistant
design, non - combustible roofing material, and related design
rating.
features. Building permits shall not be issued until review of
fire retarding architectural features has been completed by the
County Fire Protection District. Alternatively, design
standards meeting Fire Department criteria could be included
in the Fire Hazard Reduction Program and incorporated into
the RPD Design Guidelines for the residential units.
City of Moorpark 01//23 /2002 Resolution 2002 -1935
Page 37
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. If required by the Fire Protection District, Interior fire sprinkler
Interior fire sprinkler systems
Prior to issuance of a building
Verification by
systems and /or roof sprinkler systems shall be included in the
and /or roof sprinkler systems
permit for lots adjacent to open
Building and Safety
homes constructed on any lot adjacent to the unmodified
shall be included in the West
space.
Department.
open space.
Pointe Homes Development
on any lot adjacent to
Date Approved:
unmodified open s ace.
5. The applicant shall be required to comply with all County Fire
The applicant shall be
Prior to issuance of a building
Verification by
Protection District design requirements regarding hydrant
required to comply with all
permit.
Building and Safety
locations, fire ratings for building materials, fuel modification
County Fire Protection District
Department.
requirements, fee payments for pro -rata cumulative impacts
design requirements
and other standard fire safety requirements prior to issuance
regarding hydrant locations,
Date Approved:
of building permits. The City shall not issue building permits
fire ratings for building
until plan review and approval has been obtained from the
materials, fuel modification
County Fire Protection District.
requirements, fee payments
for pro -rata cumulative
impacts and other standard
fire safety requirements
6. Prior to recordation of the Final Map, the proposed interim
The proposed interim
Prior to recordation of the Final
Verification by City
secondary fire access road which extends onto adjacent
secondary fire access road
Map.
Engineer and
private property shall be recorded as a revocable easement
shall be recorded as a
Director of
benefiting the West Pointe Homes subdivision. The terms of
revocable easement
Community
revocation of this easement shall be limited to a condition that
benefiting the West Pointe
Development.
adequate dual access to the site be provided developing a
Homes subdivision.
southern connector public street which shall link the West
Date Approved:
Pointe Homes project to the proposed North Hills Parkway
arterial or other linkage to the public street system to be
developed by the Hitch Ranch Specific Plan.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 38
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
7. Buildout of the project shall be consistent with an approved
Project buildout shall be
Prior to recordation of the Final
Verification by
Phasing Plan approved by the City Council. The Plan shall be
consistent with the Phasing
Map
Director of
consistent with requirements to provide adequate dual access
Plan approved by the City
Community
to the proposed subdivision.
Council.
Development.
Date Approved:
8. During all grading and site clearance activities, earth moving
Earth moving and clearing
Continuous during clearing and
Verification by City
equipment shall be equipped with spark arrestors and at least
equipment shall be equipped
grading operations.
Fire Department and
two fire extinguishers. All equipment used in the vegetation
with spark arrestors and at
Developers Contract
clearance phase shall be equipped with spark arrestors and
least two fire extinguishers.
Manager,
best available fire safety technology. The vegetation
clearance activities shall be coordinated with and approved by
Date Approved:
the County Fire Protection Division.
9. All equipment and material staging activities shall be
All equipment and material
Same ass (8) above.
Verification by City
coordinated with the County Fire Prevention Division. Fire
staging activities and any
Engineer and
prone construction activities shall be prohibited during "Santa
prohibited activities shall be
Director of
Ana" wind conditions.
monitored and enforced by
Community
the County Fire Prevention
Development.
Division.
Date Approved:
10. The applicant shall be required to make a pro -rata fee
The applicant shall make a
Prior to recordation of the final
Verification by
contribution to the provision of fire protection services. This
pro -rata fee contribution to
map.
Director of
fee shall be established prior to recordation of the first tract
the provision of fire protection
Community
map and shall be used to fund the construction, operation, or
services.
Development.
maintenance of fire suppression facilities in the project vicinity.
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 39
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
11. Approved turn around areas for fire apparatus shall be
Approved turn around areas
Prior to recordation of a final map.
Verification by
provided where any access road is 150 feet or more from the
shall be compliant with Fire
Director of
main project collector.
Department Standards.
Community
Development.
Date Approved:
12. If deemed necessary by the District, the project shall include
If deemed necessary by the
Prior to recordation of a final map.
Verification by Fire
a heliport and associated fire suppression equipment storage.
District, the project shall
Department.
Any heliport facilities shall be conditioned for the Final Map of
include a heliport and
the project.
associated fire suppression
Date Approved:
equipment stora e.
13. Any gates to control vehicle access are to be located to allow
Gates to control vehicle
Prior to occupancy of the first
Verification by Fire
a vehicle waiting for entrance to be completely off the public
access are to be located to
phase of the project.
Prevention Bureau
roadway. The method of gate control shall be subject to
allow a vehicle waiting for
and Director of
review by the Fire Prevention Bureau. A minimum clear open
entrance to be completely off
Community
width of 15 feet in each direction shall be provided. If gates
the public roadway.
Development.
are to be locked, a Knox System shall be installed.
Date Approved:
14. Prior to recordation of a final map, proposed street names
Proposed street names shall
Prior to recordation of the Final
Verification by Fire
shall be submitted to the Fire Department Communication
be submitted to the Fire
Map.
Prevention Bureau
Center and the City for review and comment.
Department Communication
and City Engineer.
Center and the City for review
and comment.
Date Approved:
15. Street signs consistent with County Road and Fire District
Same as (14) above.
Same as (14) above.
Same as (14) above.
Standards shall be installed prior to occupancy.
Date Approved:
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 40
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
16. Prior to grading, the applicant shall submit plans to the
The applicant shall submit
Prior to issuance of a zoning
Same as (14) above.
Ventura County Fire Prevention Division for the approval of
plans to the Ventura County
clearance for a grading permit.
the location of fire hydrants; all hydrants shall be shown on
Fire Prevention Division for
Date Approved:
the plan that are situated within 500 feet of the perimeter of
the approval of the location of
the residential development.
fire hydrants
17. A minimum fire flow of 1,000 gallons per minute shall be
A minimum fire flow of 1,000
Prior to recordation of the Final
Same as (14) above.
provided. The location and capacity of all water storage and
gallons per minute shall be
Map.
conveyance facilities shall be reviewed and approved by the
provided to all conveyance
Date Approved:
District.
and water storage facilities
18. Fire hydrants shall be installed and in service prior to
Fire hydrants shall be
Same as (16) above.
Verification by City
combustible construction and shall conform to the minimum
installed and in- service prior
Engineer.
standards of the County Water Works Manual. These
to combustible construction
standards specify:
and shall conform to the
Date Approved:
minimum standards of the
• Each hydrant shall be a 6 inch wet barrel design, and shall
County Water Works Manual.
have one 4 inch and one 2 1/2 inch outlet.
• The required fire flow shall be achieved at no less than 20
psi residual pressure.
• Fire hydrants shall be spaced 500 feet on center, and so
located that no structure will be farther than 250 feet from
any one hydrant.
• Fire hydrants shall be 24 inch on center, recessed in from
the curb face.
19. All grass or brush exposing any structures to fire hazards shall
All grass or brush exposing
Prior to the issuance of the first
Same as (14) above.
be cleared for a distance of 100 feet prior to framing.
any structures to fire hazards
building permit.
shall be cleared for a distance
Date Approved:
of 100 feet prior to framing.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 41
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
20. An approved spark arrester shall be installed on all residential
An approved spark arrester
Same as (19) above.
Verification by
unit chimneys.
shall be installed on all
Director of
chimneys of residential units.
Community
Development and
Fire Prevention
Bureau.
Date Approved:
California Administrative Code (Title 24- Section 2.1217)
Address numbers, a minimum
Prior to occupancy or final
Verification by
requirements that shall be imposed on the project include:
of 4 inches high, shall be
inspection.
Building and Safety
installed prior to occupancy,
Department.
21. Address numbers, a minimum of 4 inches high, shall be
shall be of contrasting color to
installed prior to occupancy, shall be of contrasting color to the
the background, and shall be
Date Approved:
background, and shall be readily visible at night. Where
readily visible at night.
structures are set back more than 150 feet from the street,
larger numbers will be required so that they are
distinguishable from the street. In the event the structure(s) is
not visible from the street, the address number(s) shall be
posted adjacent to the driveway entrance.
22. Portions of this development within a designated hazardous
Structures within a
Same as (19) above.
Verification by
fire area shall meet hazardous fire area building code
designated hazardous fire
Building and Safety
requirements.
area shall meet hazardous
Department and Fire
fire area building code
Prevention Bureau.
requirements.
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 42
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Growth Inducements and Impacts on City Jobs: Housing
Balance
1. Prior to issuance of a Zoning Clearance for building permits,
The potable water, reclaimed
Prior to issuance of Zoning
Verification by
the potable water, reclaimed water, and wastewater disposal
water, and wastewater
Clearance for the first building
Community
facilities and conveyance lines required for the project shall
disposal facilities and
permit.
Development
be designed to accommodate the dwelling units together with
conveyance lines required for
Department, Building
the limited development permitted under the existing General
the project shall be designed
and Safety
Plan for lands along the conveyance lines. The computation
to accommodate the dwelling
Department, and
of future buildout is subject to the review and approval of the
units together with the limited
Servicing Utility
Director of Community Development prior to determining final
development permitted under
Agencies.
line sizing. Building permits shall not be issued until this
the existing General Plan for
computation is provided and verified by service providers.
lands along the conveyance
Date Approved:
All facilities shall be designed to accommodate peak rather
lines.
than average demand.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 43
\
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
i
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Traffic and Transportation
1. The applicant has agreed to fund the cost of required
The applicant has agreed to
Prior to issuance of a building
Verification by City
improvements to the intersection of High Street and Spring
fund the cost of required
permit for the first residential unit.
Engineer.
Road. Anticipated improvements may include, but are not
improvements to the
limited to, the intersection improvements necessary to ensure
intersection of High Street
Date Approved:
operations are maintained at Level of Service C. The
and Spring Road.
improvements may also include restriping of lane approaches
to provide an additional east bound lane. Widening may also
be required to complete this improvement. This improvement
shall be completed under a reimbursement agreement
acceptable both to the City and to the applicant. Terms of
reimbursement shall be defined in the Development
Agreement for the project. Completion of this improvement by
the applicant is in excess of CEQA based pro -rata
requirements and has been entered into voluntarily by the
applicant. This improvement shall be completed prior to the
issuance of building permits for the 1 st residential dwelling unit
in the project.
Resolution 2002 -1935
City of Moorpark 01//23/2002 Page 44
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
2. The applicant has agreed to fund the cost of required
The applicant has agreed to
Prior to issuance of a building
Verification of
improvements to the intersection of Moorpark Avenue
fund the cost of required
permit for the first residential unit.
compliance by City
and High Street to ensure that project plus near term
improvements to the
Engineer.
cumulative traffic does not result in a reduction of
intersection of Moorpark
Level of Service to LOS D. Anticipated improvements
Avenue and High Street.
Date Approved:
to this intersection may include widening approaches
to provide an additional through lane, restriping,
providing signal timing and coordination between
Casey Road and Moorpark Avenue /High Street,
completing north and south bound lane approaches,
and related pedestrian improvements in the vicinity of
the Moorpark Avenue /High Street intersection. This
improvement shall be completed under a
reimbursement agreement acceptable both to the City
and to the applicant. Terms of reimbursement shall
be defined in the Development Agreement for the
project. Completion of this improvement by the
applicant is in excess of CEQA based pro -rata
requirements and has been entered into voluntarily by
the applicant. This improvement shall be completed
prior to the issuance of building permits for the 60th
residential dwelling unit in the project. The
improvement shall be completed and in operation
prior to the issuance of the 100th building permit for
the project.
City of Moorpark 01//23 /2002 Resolution 2002 -1935
Page 45
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
3. The applicant shall contribute to any cumulative traffic fee
The applicant shall contribute
Prior to issuance of a building
Verification by
program adopted by the City prior to issuance of the first
to any cumulative traffic fee
permit for the first residential unit.
Community
residential building permit for the project. At this time, relevant
program adopted by the City.
Development
fee programs exist only for the Los Angeles Avenue Area of
'
Department and the
Contribution (AOC). Fees shall be paid in accord with AOC
City's Traffic
procedures in effect at the time of building permit issuance. In
Engineer.
addition to the AOC fee (which only addresses improvements
along the Los Angeles Avenue Corridor), the developer shall
Date Approved:
be required to make similar pro -rata contributions to any other
traffic mitigation related pre- construction impact fees approved
by the City Council to offset the long term effects on the City's
street system. If the residential portion of the project is
constructed prior to the adoption of any such additional
mitigation fee programs being adopted, then, for impacts to
intersections outside of the Los Angeles Avenue Area of
Contribution, a proportionate share of future improvement
costs shall be collected for locations where project traffic has a
measurable effect on cumulative traffic volumes. The City
Traffic Engineer and Community Development Department
Director shall determine the required contributions prior to
issuance of building permits; fees shall be paid prior to the
issuance of these permits.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 46
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. The following traffic calming devices /techniques, if required by
The applicant shall
Prior to occupancy of the first
Verification by the
the Conditions of Approval or the Development Agreement,
incorporate traffic calming
dwelling unit.
City Engineer.
shall be incorporated into the street improvements within the
techniques /devices as
Caltrans frontage adjacent to the West Pointe project:
required by the Conditions of
• rumble strips shall be placed on both the north and
Approval and /or the
southbound approaches to the project entrance
Development Agreement
intersection;
• intersection warning signage shall be placed on both
north and southbound approaches to this intersection as
well;
• to the degree permitted by Caltrans, the project entrance
design shall be refined to include landscape transitions
which parallel left turn and deceleration /acceleration
lanes since an organized and patterned street tree
planting program influences travel speeds;
• speed limits should be clearly and sufficiently posted
above and below the project entrance;
• the City should implement a posted excess fine program
for speeding along the corridor (similar to the Caltrans
"Fines Doubled in Construction Zone" warnings posted in
construction areas; and
• advance signal and intersection notification should be
provided on the approach to the project intersection if it is
signalized in the future.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 47
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
5. To improve operations in the lower portion of the Walnut
The applicant, if required by
Prior to issuance of the first
Verification of
Canyon Corridor between Casey Road and the intersection of
the Conditions of the Vesting
building permit.
compliance by City
Moorpark Avenue /High Street, the applicant shall fund the
Tentative Map and /or the
Engineer.
following additional improvement measures, if required by the
Development Agreement,
Conditions of the Vesting Tentative Map and /or the
shall fund and construct all
Date Approved:
Development Agreement:
required traffic improvement
• The approaches to Moorpark Avenue /High Street shall be
measures along the project
widened and re- striped to provide additional turning and
frontage in the lower portion
through lanes;
of the Walnut Canyon
• The Charles Street intersection with Walnut Canyon shall
Corridor.
be restriped to provide proper pedestrian crossings and
to maintain clearance for northbound left turn movements
• Appropriate traffic calming devices shall be installed
along approaches to intersections between Casey Road
and Moorpark Avenue /High Street;
• Proper signal interconnection, video controls, and
improved signal coordination shall be installed between
Casey Road/Walnut Canyon Road and Moorpark
Avenue/ Los Angeles Avenue.
6. The applicant for West Pointe Homes, if required by the
The applicant, if required by
Prior to recordation of the
Verification by
Conditions of Approval and /or the Development Agreement,
the Conditions of Approval for
Development Agreement.
Director of
shall contribute a pro -rata portion of the costs associated with
Vesting Map and /or the
Community
implementing traffic improvements noted in 5 above. Until or
Development Agreement,
Development.
unless an Interim Corridor Improvement Plan is developed for
shall provide a pro -rata
Walnut Canyon Road (SR -23), the contribution of this project
contribution to supplement
Date Approved:
to the proposed improvements noted in measure (4) above
the costs of traffic
should be negotiated as a component of the project
improvement implementation
Development Agreement application.
along the Walnut Canyon
Corridor.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 48
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
7. The frontage improvements associated with the project shall
The applicant shall provide
Prior to recordation of the first
Director of
include completing shoulder widening and shoulder safety
frontage improvements along
Phase of the Tentative Tract Map.
Community
improvements along reverse curves immediately north and
Walnut Canyon Road as
Development and the
south of the project. The scope of this improvement shall be
required by the Conditions of
City Engineer.
negotiated in the Development Agreement for the project. The
Approval and /or the
extent of improvement should be commensurate and
Development Agreement
Date Approved:
proportional to the ultimate number of units developed.
8. The primary project collector street intersection with Walnut
Primary project collector
Prior to recordation of a Final
Verification by City
Canyon Road (State Route 23) shall be designed in
street intersection with
Map.
Engineer and
consultation with Caltrans to ensure that acceptable turning
Walnut Canyon Road (State
Director of
radii, lane widths, shoulders, lane tapers, and adequate
Route 23) shall be designed
Community
acceleration and deceleration improvements are incorporated
in consultation with Caltrans
Development.
into the project entrance improvement program. Modifications
to ensure that acceptable
to State Route 23 required by Caltrans shall be constructed
turning radii, lane widths,
Date Approved:
prior to issuance of first residential dwelling unit. An
shoulders, lane tapers, and
encroachment permit shall be obtained from Caltrans prior to
adequate acceleration and
construction of any proposed roadway improvements. Any
deceleration improvements.
additional right -of -way required to implement the Caltrans
approved design for this entrance intersection shall be
acquired by the applicant and dedicated to the State in a
manner acceptable to Caltrans. All required dedication shall
be illustrated on the Final Vesting Map.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 49
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
9. Entry monumentation that does not interfere with sight-
Entry monumentation shall be
Prior to the issuance of building
Verification by
distance or turning movements shall be incorporated into the
incorporated into the project
permits
Community
project entrance planning. Landscaping shall be provided
entrance planning.
Development
appropriate to the entry that will not interfere with sight-
Landscaping shall be
Director and City
distance or turning movement operations. The entrance
provided appropriate to the
Landscape
landscaping shall extend along the full frontage of the project
entry that will not interfere
Consultant.
to provide traffic calming consistent with current landscape
with sight- distance or turning
design practice. The final design for the project entrance
movement operations.
Date Approved:
shall be reviewed and approved by the Community
Development Director prior to the issuance of building
permits. In accord with Caltrans requirements, the turning
and acceleration lanes provided along Route 23 at the project
entrance shall be 12 feet wide.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 50
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
10. To offset concerns about dual public access to this project,
Planned connections to the
Conceptual Plan - Prior to
Verification by City
the design of the project shall be modified to ensure a
Specific Plan 1 street grid
issuance of grading permits.
Engineer and
properly designed connection of the West Pointe project to
shall be developed in concept
Director of
the proposed City street system to the south. Planned
and ultimately constructed by
Engineered Plan - Prior to
Community
connections to the Specific Plan 1 street grid shall be
the applicant.
construction of 2/3 of the total unit
Development.
developed in concept prior to issuance of grading permits.
count.
Costs associated with the development of this interconnection
Date Approved:
shall be estimated to the satisfaction of the City Engineer. No
Construction — Prior to issuance
more than 2/3 of the total project unit count or 165 units (if
of a building permit for that unit
250 units are approved) shall be permitted to be built until
which equals the 2/3 point of the
completion of this roadway connection. If the applicant so
approved number of units to be
chooses, a temporary connection to Casey Road could be
constructed.
completed at applicant expense. If such a temporary
connection is provided, a bond or other acceptable form of
surety adequate to fund this eventual southern connection (to
the boundary of the West Pointe Project) shall be required
prior to the issuance of grading permits. This item shall be
addressed in the project Development Agreement. (CE -
Map)
Public Services and Utilities
1. Prior to issuance of building permits for either the residential
Payment of all legally
Prior to issuance of any building
Verification by
or recreational components of the project, all legally
mandated school impact fees
permits.
Community
mandated school impact fees applicable at the time of Final
applicable at the time of Final
Development
Map Recordation shall be paid to the Moorpark Unified
Map Recordation shall be
Director.
School District.
paid to the Moorpark Unified
School District.
Date Approved:
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 51
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
2. The project's contribution to offsetting cumulative impacts on
The applicant shall contribute
Prior to recordation of the final
Verification by
educational quality shall be mitigated by the contribution of a
$ 20,000 in the form of an
map.
Community
$20,000 Educational Quality Grant to the City or District as
Education Quality Grant to
Development
required by the Development Agreement. This contribution is
the City or the Moorpark
Director.
not required but is considered voluntary. These funds shall
Unified School District as
be restricted to the purchase of library books and the
required by the Development
improvement of existing library resources (including special
Agreement.
Date Approved:
education teaching materials) at either elementary or
secondary school facilities.
3. Prior to issuance of building permits for either the residential
The Moorpark Police
Prior to issuance of building
Verification by the
or recreational components of the project, the Moorpark
Department shall review and
permits.
Moorpark Police
Police Department shall review development plans for the
approve development plans
Department and
incorporation of defensible space concepts to reduce
for the incorporation of
Director of
demands on police services. To the degree feasible, public
defensible space concepts to
Community
safety planning recommendations shall be incorporated into
reduce demands on police
Development.
project plans. The applicant shall prepare of list of project
services.
features and design components that demonstrate
Date Approved:
responsiveness to defensible space design concepts. The
Community Development Director shall be responsible for
review and approval of all defensible space design features
incorporated into the project. This review shall occur prior to
initiation of the plan check process for either residential or
commercial buildings.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 52
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. Prior to the issuance of a Zoning Clearance for Construction,
The applicant shall prepare
Prior to issuance of a Zoning
Verification by
the applicant shall prepare and submit to the Community
and submit a security plan for
Clearance for Construction of the
Community
Development Department for review and approval a security
the gated community. This
first unit.
Development
plan for the gated community. This plan shall be oriented to
plan shall be designed to
Director.
reducing potential service demands on police or emergency
reduce potential service
service providers.
demands on police or
Date Approved:
emergency service providers.
5. Prior to issuance of a Zoning Clearance for Construction of
A Solid Waste Management
Prior to issuance of a Zoning
Verification by
residential units a Solid Waste Management Plan shall be
Plan shall be prepared and
Clearance for construction of
Community
prepared and submitted to the Community Services Analyst
submitted to the Community
residential units.
Development
for the City responsible for Solid Waste Management
Services Analyst for the City
Director and the
Programs for review and approval. This plan, which shall
responsible for. Solid Waste
Community Services
include specific measures to reduce the amount of refuse
Management Programs for
Director.
generated by the proposed project, shall be developed in
review and approval.
consultation with the Ventura County Sold Waste
Date Approved:
Management District and the City of Moorpark to meet waste
reduction requirements established by the California
Integrated Waste Management Act of 1989.
6. The Solid Waste Mitigation Plan shall include a green waste
The plan shall include a
Prior to approval of the Final Map
Verification by
reduction program. Green waste related to open space
green waste recycling plan
and issuance of a Zoning
Community
maintenance and neighborhood yard maintenance shall not
and shall be monitored for
Clearance for construction of
Development
be deposited in landfills. Grass recycling, portable chipping,
compliance with State
residential units.
Director and
on -site reuse of trimmings, drip irrigation systems, and use of
recycling requirements by the
Community Services
efficient fertilizers and other landscape management
Community Services Analyst.
Analyst
recommendations shall be included in this program
Annual monitoring- Continuous
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 53
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
7. The Plan shall also include a provision for the integration of
A Solid Waste Management
Prior to issuance of a Zoning
Verification by
waste reduction and household hazardous waste
Plan shall be prepared and
Clearance for construction of the
Community
management concepts into the residential project CC & R's.
submitted for review and
residential units.
Development
The Plan will include measures on how to do household
approval to the Community
Director, and
recycling, composting, and refuse reduction. Educational
Services Analyst for the City.
Community Services
materials shall be provided to residents demonstrating refuse
Director.
reduction and reuse techniques.
Date Approved:
8. Where feasible, the use of recycled building materials shall be
The use of recycled building
Prior to recordation of required
Verification by
included in the construction of both the residential and
materials shall be included in
CC &Rs.
Community
recreational components of the project. Language shall be
the construction of both the
Development
included in the CC &R's to encourage such use.
residential and recreational
Director.
components of the project.
Date Approved:
9. Residential units shall include "built -in" recycling and
Units shall be equipped with
Prior to a Zoning Clearance for
Verification by
trash separation areas.
"built -in" recycling and trash
construction.
Community
separation areas.
Development
Director.
Date Approved:
City of Moorpark 01//23 /2002 Resolution 2002 -1935
Page 54
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Aesthetics and Visual Resources
1. The entrance to the proposed project shall be designed to
The entrance to the proposed
Prior to issuance of a zoning
Verification by
provide entry monumentation, appropriate landscaping and
project shall be designed to
clearance for a grading permit.
Director of
signage. An orderly and consistent tree planting program
provide entry monumentation,
Community
shall be established to provide a landscaping pattern at the
appropriate landscaping and
Development.
entranceway that resembles a rural ranch entry road design.
signage at the entry point.
All entry roads shall be planted so trees are spaced at equal
Date Approved:
intervals. Recommended tree plantings for these entry points
shall include the non - natives typically used in ranch settings
for entryways in the City of Moorpark including olive trees,
poplars, eucalyptus, and other native or naturalized trees.
The use of xeriscape accent features (agave, yucca, and local
types of cactus [Opuntia sp.] shall be encouraged in the entry
design.
2. The eastern perimeter of the project shall be designed to
The project shall be designed
provide a substantial restoration of riparian landscape features
to provide a substantial
within the Walnut Canyon drainage situated between Walnut
restoration of riparian
Prior to issuance of a zoning
Verification by
Canyon Road and the project. The drainage /detention facility
landscape features within the
clearance for a grading permit.
Director of
slopes within both the public and private debris /detention
Walnut Canyon drainage
Community
facilities within the development shall be landscaped with
situated between Walnut
Development.
native riparian woodland plants (such as valley oak, live oak,
Canyon Road and the project.
sycamore, poplar, and willow). Similar landscaping shall be
Date Approved:
provided in the central drainage located central to the project.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 55
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
3. Restoration landscaping along Walnut Canyon Road shall
The landscaping program for
Prior to issuance of a zoning
Same as (2) above.
emphasize reestablishment of existing native and non - native
areas visible from Walnut
clearance for a grading permit.
habitat. The landscaping ,program for areas visible from
Canyon Road shall
Date Approved:
Walnut Canyon Road shall emphasize restoration of the
emphasize restoration of the
existing vegetation and the use of tiered, tree lined streets to
existing vegetation and the
minimize the adverse effects of the urban design planned
use of tiered, tree lined
along this perimeter.
streets to minimize the
adverse effects of the urban
design planned along this
perimeter.
4. Low intensity night lighting shall be required within the
Low intensity night lighting
Prior to issuance of a zoning
Verification by the
streetscape and at intersections. Lighting standards shall be
shall be required within the
clearance for a grading permit.
City Lighting
rural in nature, low in profile, and shall be minimized along
streetscape and at
Engineer.
street corridors. More intensive lighting is appropriate at
intersections. Front and rear
intersections within the project boundary but this lighting shall
yard lighting restrictions shall
Date Approved:
be only sufficiently intensive to provide for vehicle and
be included in the project
pedestrian safety. The project entrance lighting should
CC &Rs and Planned
emphasize low intensity landscape feature uplighting of
Development Permit
accent landscaping plants. Standard approach lighting within
conditions.
the Walnut Canyon Road Corridor shall comply with Caltrans
design standards. Front and rear yard lighting restrictions
shall be included in the project CC &Rs and Planned
Development Permit conditions.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 56
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
5. The proposed trail system for the project shall be designed to
The proposed trail system for
Prior to issuance of a zoning
Verification by
retain the integrity of the proposed open space preserve. The
the project shall be designed
clearance for a grading permit.
Community
preserve area shall be fenced (consistent with biological
to retain the integrity of the
Development
mitigation recommendations) to prevent unauthorized use or
proposed open space
Director and
intrusion. Trail systems developed within the project shall not
preserve. A qualified
approved consulting
be illuminated. A north -south trail alignment shall be
biologist shall review the plan
biologist
developed which links the east -west trail system along "C"
to minimize impacts to the
street in the Moorpark Country Club Estates project. This
open space area.
Date Approved:
north -south connection should traverse the Walnut Canyon
drainage and connect to the Hitch Ranch and other areas
south of the West Pointe project. The applicant shall be
responsible for developing this trail linkage.
6. Appropriate management and use guidelines for a proposed
The recreational facility shall
Prior to issuance of building
Verification by
recreational facility to be developed within the project
be adjacent to residents with
permit for the recreation facilities.
Community
boundary shall emphasize protecting the quality of life of
rear or front yards facing or
Development
immediately surrounding residents with rear or front yards
adjacent to this facility.
Director.
facing or adjacent to this facility.
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 57
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
7. The design of the project streetscape shall minimize street
The design of the
Prior to issuance of a zoning
Verification by
widths, provide differentiated streetscape patterns within the
streetscape, lighting and
clearance for a grading permit.
Community
various street tiers within the development and shall provide
landscaping for the project
Development
for minimal neighborhood lighting consistent with traffic and
shall be reviewed and
Director.
pedestrian safety. A parkway concept for the project should
approved in concept by the
be created to assure a decidedly rural aesthetic. This
Community Development
Date Approved:
modification may involve using rolled curbs, a narrower street
Director. Field conditions
section, low intensity decorative lighting, a parkway street
shall be subject to the review
section (rather than a typical subdivision pattern), the use of
and approval of the
decorative, rural boundary fencing along streets, and other
Community Development
features. The design of the streetscape, lighting and
Director.
landscaping for the project shall be reviewed and approved in
concept by the Community Development Director prior to
preparation of final landscape plans. Final plans shall be
prepared consistent with Director approved design concepts.
8. The streetscape within each neighborhood shall be fully
Same as (7) above.
Same as (7) above.
Same as (7) above.
landscaped and treated with rural design features typical of
the immediate project vicinity.
Date Approved:
9. Estate homes along the northern perimeter of the project shall
Estate homes along the
Prior to issuance of building
Same as (7) above.
be planned as single story structures with relatively low roof
northern perimeter shall be
permit.
profiles and reduced massing to protect the viewsheds and
designed as single -story
Date Approved:
quality of life attributes of surrounding residential properties;
structures to protect scenic
viewsheds and quality of life
attributes.
10. Homes situated on higher elevation landforms within the upper
Homes located on higher
Same as (9) above.
Same as (7) above.
tiers of the project shall be designed to have reduced massing
elevation shall be designed
and lower roof profiles to minimize their visual dominance.
with reduced massing and
Date Approved:
lower roof profiles.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 58
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
11. To the degree feasible from an engineering and slope stability
Slopes shall be constructed
Prior to issuance of a zoning
Verification by City
standpoint, the post - grading slope remediation areas along
utilizing contour grading to
clearance for a grading permit.
Engineer and
the northern and southern ridgelines should better reflect
reduce visual effects of slope
Community
contour grading design to diminish the visual effects of slope
modifications. City Engineer
Development
modifications
shall review and approve all
Director.
slope remediation plans.
Date Approved:
12. The street widths, streetscape patterns, lighting, and parkway
The street widths,
Prior to issuance of a zoning
Verification by City
concept for the project shall be created to assure a rural
streetscape patterns, lighting,
clearance for a grading permit.
Engineer and
aesthetic. This modification may involve providing for rolled
and parkway concept for the
Director of
curbs, a narrower street section, low intensity decorative
project shall be created to
Community
lighting, a parkway street section (rather than a typical
assure a rural aesthetic.
Development.
subdivision pattern), the use of decorative, rural boundary
fencing along streets, and other features.
Date Approved:
13. A dedicated location, perhaps adjacent to the proposed HOA
A location shall be set aside
Prior to issuance of any building
Verification by City
meeting hall, shall be set aside for landscape maintenance
for storage of landscape
permits for the recreation
Engineer.
tools and equipment;
maintenance tools and
buildings or improvements.
..equipment.
Date Approved:
14. The streetscape within the various tiers of the neighborhood
Streetscapes for the interior
Prior to issuance of a zoning
Verification by
should be fully landscaped and treated with rural design
shall be developed to
clearance for a grading permit.
Community
features typical of the immediate neighborhood.
maintain rural character.
Development
Director.
Date Approved:
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 59
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitorinq and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
15. An area dedicated to neighborhood use, congregation and
The project shall incorporate
Prior to issuance of a zoning
Verification by
recreation should be incorporated to enhance the sense of
areas of congregation and
clearance for a grading permit.
Community
community and quality of life of future residents and to reduce
recreation.
Development
impacts upon other public facilities. Recommended
Director.
components for this area include:
• tennis courts,
Date Approved:
• a neighborhood swimming pool,
• a small office and assembly room which would serve as
an HOA office and community meeting area, and
• a small landscaped park/picnic and outdoor congregation
area.
16. The design features of the project shall comply, to the extent
The design features of the
Prior to issuance of a zoning
Same as (15) above.
feasible, with the design guidelines and development
project shall comply, to the
clearance for a grading permit.
standards contained in the City's Hillside Management
extent feasible, with the
Date Approved:
Ordinance. Final details concerning landscaping, streetscape,
design guidelines and
and the architecture of residential units shall be provided to
development standards
the Community Development Director for review and approval
contained in the City's Hillside
prior to issuance of grading permits.
Management Ordinance and
the approved RPD design
manual.
City of Moorpark 01//23/2002 , Resolution 2002 -1935
Page 60
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
13. Detailed information about the landscape, entry
Detailed design information
Prior to issuance of a zoning
Verification by
monumentation, and gate and signage design features of the
consistent with the City's
clearance for a grading permit.
Community
project shall be incorporated into the Project Description or
Hillside Management
Development
included in the recommended Development Agreement for
Ordinance shall be included
Director.
this project. This detailed information shall comply with the
on the landscaping,
design guidelines and development standards contained in the
streetscape and architectural
Date Approved:
City's Hillside Management Ordinance. Details concerning
plans.
landscaping, streetscape, and the architecture of residential
units shall be provided to the Community Development
Director for review and approval prior to issuance of grading
permits.
Cultural Resources
1. A cultural resource monitoring program shall be instituted
A cultural resource monitoring
Continuous during initial clearing
Verification of
during the initial vegetation clearance for the project. The
program shall be instituted
of the project and subsequent
Compliance by City's
purpose of this monitoring program is to determine if any
during the initial vegetation
phases of grading.
Environmental
significant deposits not identified during the Phase I survey
clearance for the project. A
Consultant.
exist within the project boundary. The monitoring shall be
qualified archaeologist shall
limited to the initial vegetation clearance phase of the grading
be on -site during all Phase I
Date Approved:
program. If cultural deposits meeting the significance criteria
grading activities.
defined in CEQA Guidelines are encountered, limited data
recovery shall be conducted. Chumash representatives shall
be actively involved in the monitoring and any subsequent
phases of the project mitigation program. Participation shall
include monitoring of archaeological investigations,
construction monitoring, and data analysis.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 61
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
Insignificant Effects
1. Prior to the issuance of a Zoning Clearance for the first
An exterior lighting plan shall
Prior to issuance of building
Verification by
building permit to be issued for the project, the Community
be prepared by an electrical
permits for the first residential
Community
Development Director shall approve a lighting plan for all
engineer registered in the
unit.
Development
exterior lighting. A lighting plan shall be prepared by an
State of California.
Director and City
electrical engineer registered in the State of California. The
Engineer.
lighting plan shall achieve the following objectives: avoid
interferences with reasonable use of adjoining properties;
Date Approved:
minimize on -site and off -site glare; provide adequate on -site
lighting; limit electroliers height to avoid excessive illumination;
provide structures which are compatible with the total design
of the proposed facility; and minimize energy consumption.
The lighting plan shall include the following provisions:
2. A photometric plan showing a point -by -point foot candle layout
A photometric plan shall be
Prior to issuance of any building
Verification by City
to extend a minimum of twenty (20) feet outside the parking lot
prepared by the applicant.
permits.
Lighting Engineer
and clubhouse boundaries. The layout plan is to be based on
and Director of
a ten (10) foot grid center. Down lighting and accent
Community
landscape and building lighting shall be employed throughout
Development.
the project. Entrance lighting along project access roads shall
be compatible with the surrounding rural neighborhood.
Date Approved:
3. Maximum overall height of fixtures shall be twenty (20) feet,
Light fixtures shall not exceed
Same as (2) above.
Same as (2) above.
unless otherwise approved by the Community Development
height limitations unless
Director. Fixtures must possess sharp cut -off qualities with a
cleared by Community
Date Approved:
maximum of one foot candle illumination at property lines.
Development Director.
City of Moorpark 01//23/2002 Resolution 2002-1935
Page 62
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
4. There shall be no more than a seven -to -one (7:1) ratio level of
Lighting standards shall be
Prior to issuance of any building
Same as (2) above.
illumination shown (maximum -to- minimum ratio between
designed to the specification
permits.
lighting standards).
of Moorpark Municipal Code
Date Approved:
17 -30.
5. Energy efficient lighting fixtures shall be provided which are
Compliance with Moorpark
Prior to issuance of any building
Verification by City
compatible with adjacent properties.
Municipal Code 17 -30.
permits.
Lighting Engineer.
Date Approved:
6. No light shall be emitted above the 90 degree or horizontal
Same as (4) above
Prior to issuance of any building
Same as (5) above.
plane. No direct light source shall be visible from the street or
permits.
adjacent properties.
Date Approved:
7. Light standards in the parking lot shall be shielded and
Same as (4) above
Prior to issuance of any building
Same as (5) above.
directed downward to avoid light and glare on neighboring
permits.
properties.
'
Date Approved:
8. Lighting devices shall be high enough to prohibit tampering by
Same as (4) above
Prior to issuance of any building
Same as (5) above.
anyone on the ground unless tamper -proof fixtures are
permits.
approved by the Director of Community Development. All
Date Approved:
parking areas shall be provided with a lighting system capable
of illuminating the parking surface with a minimum maintained
1 -foot candle of light and shall be designed to minimize the
spillage of light onto adjacent properties. All exterior lighting
devices shall be protected by weather and breakage resistant
covers.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 63
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Mitigation Monitoring and Reporting Program — West Pointe Homes
Mitigation Measure
Monitoring Actions
Verification and Frequency
Compliance Agent
9. Street lighting and rural lot lighting standards specified in the
Same as (4) above
Prior to issuance of any building
Same as (5) above.
EIR Urban Design Guidelines shall be incorporated into the
permits.
project photometric plans.
Date Approved:
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 64
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
s _ '� ��- � :� �� 1'rcor "orate r �.t Fr �"'ect D � � � � _ . �.. = � • � � �-� ;�.
Environmental
Issue
Mitigation Measure
Habitat
Prior to issuance of grading permits, the Director of Community Development shall approve a Habitat Enhancement Plan which shall be
Enhancement
integrated into the Landscape Plan for the project. The intent of the Plan would be to protect on -site natural systems, trees and resources
Plan
and to devise methods for integrating planting suitable for recreational activities into the Landscape Plan. The Plan shall also provide
guidance regarding revegetation of wetland /riparian areas that will be disturbed by construction. The advice provided in this Plan should
apply to all existing or created on -site oak woodlands, riparian areas, detention basins and fuel modification zones. The purpose of this plan
shall be to increase the biological carrying capacity of these areas.
Introduction of
Certain ornamental plants are known to escape from planted areas and invade into native plant communities. In order to protect the native
non - native
plant communities that are located within the natural open space areas of the site, the plants listed in Table 4 -2 will not be planted within the
species
common landscaped areas of the proposed site plan. This table shall be included within the CC & R's to notify and educate homeowners. In
addition, the landscaping plans within common areas of the project shall be reviewed by a qualified botanist, who shall recommend
appropriate provisions to prevent other invasive plant species from colonizing remaining natural areas. These provisions may include the
following: (a) review and screening of proposed plant palette and planting plans to identify and avoid the use of invasive species; (b) weed
removal during the initial planting of landscaped areas; and (c) the monitoring for and removal of weeds and other invasive plant species as
part of ongoing landscape maintenance activities. The frequency and method of monitoring for invasive species shall be determined by a
qualified botanist.
Light and Glare
Al All lighting along the perimeter of natural areas, particularly street lamps, shall be downcast luminaries and shall be shielded and oriented
in a manner that will prevent spillage or glare into the remaining natural and open space areas. Final lighting orientation and design shall be
approved by the City. All lighting proposed shall be consistent with Chapter 17.30 of the Municipal Code.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 65
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
Biological
To limit impacts to biological resources, the following design and construction measures will be incorporated into either the Environmental
Impacts Resulting
Quality Assurance Program for the project (refer to Chapter 18 of the EIR, Mitigation Monitoring and Reporting Program), or into the project
from Grading and
design itself. Some of these measures should be incorporated into grading bid documents to ensure that contractors are aware of likely
Construction
construction limitations.
Activities
The construction documents will clearly delineate the limits of grading, and the location of remaining trees, remaining jurisdictional
resources, and the preserved natural open space areas.
• Limit of grading will be staked and flagged by a qualified surveyor in accordance with the final approved grading plan. Prior to surveying
activities, the surveyor will be instructed to avoid driving on or immediately adjacent to sensitive biological resources, including remaining
trees, remaining jurisdictional resources, and remaining natural habitats.
The construction contractor will ensure that temporary chain -link fencing is installed at the limit of grading when the grading limit is close
to natural habitat areas or to jurisdictional resources. The fencing will remain in place until grading and excavation work is complete, and
will be removed under the direction of the biological inspector. Prior to fence installation, the fencing contractor will be instructed to avoid
driving on or immediately adjacent to sensitive biological resources, including remaining trees, remaining jurisdictional resources, and
remaining natural habitats.
• If the temporary fencing is damaged during construction, the construction contractor shall be responsible for repairing the damage within
48 hours.
• Signs, which state that access to the preserved natural open space areas is prohibited, will be attached to the temporary chain -link
fencing.
• All California black walnut, native oak, and mature trees within 200 feet of grading and construction shall be inventoried and marked for
protection prior to any construction activities. Trees to be removed shall be painted with a red "X" on the trunk. Trees to be preserved
shall be flagged with yellow flagging visible from all directions. The flagging will not be nailed to any trees.
City of Moorpark 01//23 /2002 Resolution 2002 -1935
Page 66
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
Biological
All California black walnut, native oak, and mature trees to be preserved in the vicinity of the limits of grading shall be protected with
Impacts Resulting
temporary fencing. Plastic snow - fencing, available in bright orange, is recommended for its high visibility and ease of installation. Where
from Grading and
possible, the fencing will be no closer than 5 feet to the dripline of any tree.
Construction
Activities
Where necessary, erosion control measures shall be constructed on the slopes below grading areas to prevent erosion and deposition of
(continued)
materials into areas with remaining California black walnut, native oak, and mature trees during grading and construction activities.
These erosion control measures will also prevent silts from entering drainages.
• The biological inspector shall prepare an instruction sheet for all equipment operators who will work on the site. The instruction sheet
shall include information that will be stated in the CDFG Streambed Alteration Agreement, including, but not limited to, protection of the
preserved jurisdictional areas from litter, contaminants, and debris. Each operator will be required to sign an acknowledgment that they
are aware of these conditions and that their violation of such conditions may result in their termination of work on the site and financial
responsibility for correction of damage.
• The biological inspector shall conduct meetings with the contractor and other key construction personnel describing the importance of
restricting work to within the grading limit and outside of the preserved areas. The inspector should also discuss staging /storage areas
for construction equipment and materials. The biological inspector shall investigate all on -site storage areas to minimize impacts to
biological resources. Construction access, parking, storage of equipment and materials shall not occur within 25 feet of the dripline of
any California black walnut, native oak, or mature trees.
Construction personnel shall be prohibited from entry into areas outside the designated construction area, except for necessary
construction related activities, such as surveying, and the potential construction of storm drain inlet and outlet structures. All such
construction activities in or adjacent to remaining open space areas shall be coordinated with the biological inspector.
• The construction contractor will install temporary erosion control measures, if necessary, to reduce impacts to and protect on -site
drainages from excess sedimentation, siltation, and erosion. These measures shall consist the use of temporary soil covers, such as
hydroseeding with native plants, mulch /binder and erosion control blankets to protect exposed soil from wind and rain; and /or the
installation of silt fencing, sandbags, hay /straw bales (excluding rice straw), berms, and dikes to protect storm drain inlets and drainages.
The biological inspector will periodically examine the erosion control devices to ensure that they are working correctly. The construction
contractor will be responsible for repairing any erosion control devices should they fail to work correctly.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 67
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
Biological
Impacts Resulting
No refueling, changing of oil or other fluids shall occur on the project site. Vehicles carrying supplies, such as concrete, should not be
allowed to empty, clean out, or otherwise place materials into the on -site open space areas or natural areas located immediately
from Grading and
adjacent to the site. If oil or other fluids are accidentally spilled within the open space areas of the site, the contaminated soil will be
Construction
immediately removed from the area and disposed of in a legally acceptable manner.
Activities
(continued)
No discarding of any trash or other construction waste materials within the open space areas or natural areas located immediately
adjacent to the site is permitted. The construction contractor will periodically collected trash and debris within the construction areas and
dispose of trash and debris off site in a legal manner.
• Any equipment or vehicles driven and /or operated within or adjacent to the on -site drainages shall be checked and maintained daily, to
prevent leaks of materials that if introduced to water could be deleterious to aquatic life. No equipment maintenance shall be conducted
within or adjacent to the jurisdictional areas or within 50 feet of these areas.
Standard dust control measures of the Ventura County Air Pollution Control District shall be implemented to reduce impacts on nearby
plants and wildlife. This includes a variety of options to reduce dust including replacing ground cover in disturbed areas as quickly as
possible, watering active sites regularly, and suspending all excavating and grading operations during periods of high winds.
• All construction activities in the vicinity of any California black walnut, native oak, or mature trees shall be monitored periodically by the
biological inspector and /or a qualified arborist retained through the EQAP program for the project.
• The EQAP arborist will monitor all grading and construction activities that are located within 5 feet of the dripline of any California black
walnut, native oak, or mature trees.
Construction access shall be planned to minimize pruning of trees. However, all dead branches, and large branches that distort the
symmetry or sound structure of the tree or trees that pose a hazard, should be removed. All necessary pruning will be done by a
qualified arborist.
• Where possible, no soil compaction, trenching, grading, or fill will occur within 5 feet of the dripline of any California black walnut, native
oak, or mature trees.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 68
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
Biological
If it is necessary to lower the grade within or less than 5 feet from the dripline of any California black walnut, native oak, or mature trees,
Impacts Resulting
attempts shall be made to avoid or limit damage to the root zone. Retaining walls shall be used around trees if needed to preserve the
from Grading and
root zone. If a retaining wall is not feasible, then 4 to 6 inches of mulch or ungrouted stone will be placed on the cut to prevent roots from
Construction
drying out.
Activities
(continued)
During or following construction, a qualified arborist will prune all dead branches and hazardous limbs from all remaining trees located
adjacent to the development envelope. No dead branches will be removed that contain bird nest cavities unless it must be removed for
safety reasons.
• Grading shall occur uphill from remaining California black walnut, native oak, and mature trees in such a way as to prevent excess soil
and rock from escaping downslope and disturbing the base of the tree.
• Any brush clearance within the dripline of trees shall be completed by hand - tools.
• If during grading or trenching, woody roots are exposed, the work shall be monitored by the biological inspector or a qualified arborist
and the following treatments shall be provided:
- Remove soil in lines radial to the tree rather than tangential to avoid excessive ripping and shattering of roots.
- Cut all exposed roots cleanly at a 90 degree angle; avoid cutting roots under which tunnels could be dug for utility lines.
- Place a minimum of six inches of sand over exposed cuts and roots to reduce soil desiccation until the area is backfilled. Only treat
cuts with a tree sealant prior to backfilling if recommended by the biological inspector or qualified arborist.
- Backfill with native soil as soon as possible.
- After any trenching in the root zone, the tree shall be carefully pruned by a qualified arborist to remove canopy material proportional
to the roots which were removed or damaged.
The canopies of all remaining trees in the vicinity of construction activity shall be periodically sprayed with water to reduce dust
accumulation on the leaves.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 69
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
Biological
Where possible, irrigation devices shall be planned to be installed outside of the dripline of oaks. Irrigation will be designed to avoid
Impacts Resulting
wetting areas within the dripline of oaks during operation of the system.
from Grading and
Construction
Unavoidable surface runoff will be directed away from remaining trees or will be gathered outside the dripline by a swale or other means.
Activities
No water will be allowed to pond or collect within the dripline of any oak.
(continued)
Post - Construction Conditions
• Upon completion of construction, the contractor shall be held responsible to restore any haul roads, access roads, staging areas, or
graded areas that are outside of approved grading limits. Restoration shall be done in consultation with a restoration biologist.
• Following construction activities, the construction contractor will be collect all trash and debris from within the open space areas of the
site and dispose of this trash and debris off site in a legal manner.
• The construction contractor will remove the temporary chain -link fencing following grading and construction activities.
• Erosion control devices, such as silt fencing, sandbags, and hay /straw bales, that were installed to protect the open space areas during
construction, will be removed at the discretion of the biological inspector.
Air Quality
Air Quality Mitigation Plan
Mitigation Plan
The applicant's environmental consultants have proposed that the following measures be incorporated into a Air Quality Mitigation Plan.
Prior to issuance of grading or building permits, the Community Development Director shall approve this Plan. The Plan shall apply to all
areas within the project boundary where mass grading will occur. The purpose of this plan shall be to decrease the air quality impacts of the
project grading program and other construction activities. Policies and design features to be incorporated into this plan shall address the
following concerns.
(1) The Construction Supervisor shall require all development contractors to keep records on the project site demonstrating that
equipment engines are maintained in good condition and in proper tune as per manufacturer's specifications to prevent
excessive emissions. Such records shall be made available for review by the City during grading and construction inspections.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 70
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
(2) The Construction Supervisor shall prepare and submit a dust control plan at the time that grading permits are requested for
review and approval by the City.
(3) All active portions of the construction site shall be sufficiently watered at least twice daily to minimize fugitive dust generation.
Other dust and particulate control measures required to be implemented during construction include the following:
■ Replace ground cover or apply APCD- approved chemical soil stabilizers according to manufacturer's specifications to all
inactive portions of the construction site (previously graded areas inactive for four days or more).
■ Apply water twice daily or chemical stabilizers according to manufacturers' specifications to all unpaved parking or staging
areas, and unpaved road surfaces.
■ Suspend all excavating and grading operations when wind speeds exceed 15 mph averaged over one hour. The developer
may contact the APCD meteorologist for current information about average wind speeds.
• Sufficiently water or securely cover all material transported off -site and all fill material (if any) transported on -site.
■ Inform all employees involved in grading operations on the project site to wear face masks during dry periods to reduce
inhalation of dust which may exacerbate health problems of the respiratory tract..
■ Limit traffic speeds on all unpaved roads to 15 mph or less via the posting of speed limit signs.
Geologic and
Seismic Hazard
The applicant has agreed to incorporate the following design mitigation measures into the final project design. City plan check staff and field
Design Mitigation
inspectors will be responsible for ensuring adherence to these procedures from plan preparation through final grading and construction.
Planning
(1) All project structures must comply with current seismic safety requirements, including the Uniform Building Code (UBC) and City
requirements. The seismic potential of the San Andreas, Oak Ridge and Santa Rosa faults shall determine specific building
requirements.
(2) All alluvial materials within the development area shall be removed and re- compacted prior to overlying fill materials. Removal shall
occur in accordance with the soils and geology study recommendations.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 71
West Pointe Homes 1
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
Geologic and
(3) Landslide materials within the development area shall be removed and /or buttressed in accordance with the soils and geology
Seismic Hazard
study recommendations.
Design Mitigation
Planning (Cont)
(4) All cut slopes shall be inspected during grading to ensure exposure of stable geologic conditions. Standard stabilization measures,
such as buttresses or stabilization fill, shall be used wherever potential instabilities occur.
(5) Prior to issuing any grading permits, the Regional Water Quality Control Board - Los Angeles Region and the City of Moorpark shall
approve a Stormwater Pollution Prevention Plan ( SWPPP) for the project. The SWPPP shall include measures to prevent erosion
and contain hazardous materials spills. Specific elements of the SWPPP may include, but are not limited to:
• Installing sand bags at existing and proposed storm drain inlets;
• Stabilizing soil in future phase areas after rough grading;
• Limiting the number of separate staging, construction and storage areas (including vehicle) to minimize ongoing disruptions and
simplify contaminant collection and disposal;
• Identifying fuel storage areas; and
• Erecting barriers around vehicle, equipment and fuel storage areas to prevent trespassing.
Fire Safety and
The applicant's environmental consultants have proposed that the following measures be incorporated into a Fire Safety and Fuel
Fuel Modification
Modification Plan. Prior to issuance of grading or building permits, the Community Development Director shall approve this Plan and buildout
Plan
of the project shall conform with the adopted Plan. This mitigation planning effort shall apply to all areas within the project boundary where
mass grading will occur and where fuel modification is planned. The purpose of this plan shall be to decrease the short and long term
potential for wildland fires within the project boundary. Policies and design features to be incorporated into this plan shall address the
following concerns.
(1) During all grading and site clearance activities, heavy duty equipment shall be equipped with spark arrestors and at least two fire
extinguishers.
(2) All vegetation clearance activities shall be coordinated with the Ventura County Fire Protection District.
(3) All equipment and material staging activities shall be coordinated with the Ventura County Fire Protection District.
City of Moorpark 01 //23/2002 Resolution 2002 -1935
Page 72
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Mitigation Measure
Fire Safety and
(4) Fire prone construction activities shall be prohibited during "Santa Ana" wind conditions.
Fuel Modification
Plan (Cont)
(5) Prior to recordation of the Final Map or issuance of building permits, the project developer shall retain a certified fire
management professional to prepare and submit a Fire Hazard Reduction Program for review and approval by the City of
Moorpark Community Development Director. This program shall be prepared in consultation with the Ventura County Fire
Protection District and a native plant specialist. The program shall apply to all lands within 100 feet of the residential structures
and 25 feet from roads. These areas will be permanently maintained to reduce fuel loads, as directed in the field by the Fire
Protection District.
(6) The vegetation management requirements of the plan shall be clearly defined, with an emphasis towards retaining these areas
in as natural a state as safety and fire regulations will permit. The fuel modification zones shall appear as a transition area
between the built environment and natural open space. Irrigation shall not be provided, except in established wet zones, unless
necessitated by the plant materials within the zones.
(7) Fuel modification shall be implemented adjacent to each development area prior to framing or roadway construction.
(8) Fire hydrants shall be installed and in service prior to construction of combustible structures.
(9) All structures adjacent to open space areas around the perimeter of the development area shall be designed to satisfy at least a
one hour fire - resistance rating. Such structures shall incorporate fire retarding features such as boxed -in eves, reduced
overhangs, double paned windows, convection resistant roof design, non - combustible roofing material, and related design
features to meet the hazardous fire area building code requirements.
(10) All construction equipment and tools shall be properly secured during non - working hours.
(11) Licensed security service shall be provided during non - working hours during the construction phases.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 73
West Pointe Homes
250 Unit Subdivision in Walnut Canyon
Environmental
Issue
Miti ation Measure
g
Mitigation of
(1) The applicant will fund capacity improvements at the intersection of Moorpark Avenue and High Street under a reimbursement
Traffic Impacts to
agreement program which will require that all future development contributing traffic to this location will fund a pro -rata share of the
Moorpark Avenue
costs of this improvement and provide reimbursement to West Pointe Homes commensurate with estimate trip generation impacts.
and High Street
The design objective for this improvement will be to complete the intersection reconstruction referenced as "Option A" in the project
traffic report included in the EIR Technical Appendix. This improvement will provide for increased capacity at this location consistent
with General Plan Standards. The improvement shall be initiated prior to the issuance of building permits for the project.
Redesign of the
(1) The street system for this project shall be redesigned to provide a public street connection between Walnut Canyon Road
Project Street
and the street system serving Specific Plan No. 1. Gated private street connections to this public connecting street shall be
System
designed to be consistent with Hillside Management Ordinance standards and adopted design details contained in the
Residential Planned Development Permit for the project. The standard section for this public road connector shall be
consistent with recommendations imposed by the Fire Department. Once the connection to Specific Plan No. 1 is
completed, private emergency access road connections along the northern and western portions of the project may be
abandoned.
Creation of a
(1) The applicant shall design and construct a regional trail system connector linking the Moorpark Country Club Estates project
Regional North-
and Specific Plan No. 1 (to the southwest of the West Point Homes Project). The design of this trail system shall conform to
South Trail
design details to be provided in the Residential Planned Development permit for the project. This trail connector shall be
System
completed prior to occupancy of the first residential unit for the West Pointe Project. The trail system improvements shall be
planned, reviewed and constructed under the initial grading permit for the project. If an early grading agreement is
permitted for this development, the trail system planning and implementation shall be completed prior to the issuance of any
building permits for the project.
City of Moorpark 01//23/2002 Resolution 2002 -1935
Page 74
Resolution 2002 -1935
Page 75
STATE OF CALIFORNIA )
COUNTY OF VENTURA )ss.
CITY OF MOORPARK )
I, Deborah S. Traffenstedt, City Clerk of the City of
Moorpark, California, do hereby certify under penalty of perjury
that the foregoing Resolution No. 2002 -1935 was adopted by the
City Council of the City of Moorpark at adjourned meeting held
on the 23rd day of January, 2002, and that the same was adopted
by the following vote:
AYES: Councilmembers
and Mayor Hunter
NOES: None
ABSENT: None
ABSTAIN: None
Harper, Mikos, Millhouse, Wozniak
WITNESS my hand and the official seal of said City this 7th
day of February, 2002.
Deborah S. Traffenstedt, City Clerk
(seal)