Loading...
HomeMy WebLinkAboutMIN 1988 0305 PR SPCMarch 7, 1988 RESULTS OF PARK TOUR WITH COMMISSION ON MARCH 5, 1988 Faye, Please follow up and respond back on items listed below: GRIFFIN PARK: 1. Trash Cans - How often emptied? Can we add one by play area. 2. Check park plans to see if drinking fountain was planned by playground area - if not - get cost for installing same - can we install fountain? 3. Tree west of playground area - bark removed - tree needs to be removed. 4. Picnic tables carved up - splintering. What is your recommendation to correct. 5. Numerous holes in park turf - need filled/leveled. 6. Cost of adding 1 BBQ per table. How many, cost, can we install? CAMPUS CANYON PARK: 1. Call Griffin Homes, get approved plans on park development. CAMPUS PARK: 1. Reroof of building - get bids. 2. Maintenance frequency schedule - lots of trash in park, i.e., beer cans. 3. Two picnic tables missing? 4. Install additional trash cans - 1 per table.. 5. BBQ's - repair - replace, costs - can we do? 6. Add two spring animals - tot lot - get cost - do we have money in the year's budget? 7. Costs to install walk ways from street to park interior - 2 locations, see me on this. Page 2 GLENWOOD PARK: 1. Remove graffiti from table. 2. Cost of backstop for park - include footings. 3. Cost for two additional picnic tables. 4. Cost of adding tot lot - where - equipment. S. Have basketball nets replaced. 6. Cost of adding drinking fountain by play area. PN: r jh (_ C C; r� 01A i ✓A y rt.,t,