HomeMy WebLinkAboutAG RPTS 1999 1101 PR REGCITY OF MOORPARK
PARRS AND RECREATION COMMISSION AGENDA
November 1, 1999
7:00 p.m.
1. CALL TO ORDER:
2. PLEDGE OF ALLEGIANCE:
3. ROLL CALL:
Commissioners Joseph Catrambone, Tina Hare, Tom Pflaumer,
Sandra Thompson, and Chair June Dubreuil.
4. PROCLAMATIONS, COMMENDATIONS, AND SPECIAL PRESENTATIONS:
A. Staff's Monthly Report.
5. REORDERING OF, AND ADDITIONS TO, THE AGENDA:
6. PUBLIC COMMENTS:
7. CONSENT CALENDAR:
A. Approval of the Parks and Recreation Commission Minutes
of September 29, 1999. Staff Recommendation: Approve as
presented.
B. Approval of the Parks and Recreation Commission Park Tour
of September 19, 1999. Staff Recommendation: Approve as
presented.
C. Parks Quarterly Report. Staff Recommendation: Receive and
file report.
D. Summer's Recreation Quarterly Report. Staff
Recommendation: Receive and file report.
E. Camp Moorpark Survey Results. Staff Recommendation:
Receive and file report.
Any member of the public may address the Commission during the Public Comment portion of the agenda. Speaker Cards must be
received by the Recording Secretary prior to the Public Comments portion of the meeting. Speakers will be heard in the order that
their Speaker Cards are received. A limitation of three (3) minutes shall be imposed upon each speaker. Copies of the reports or other
written documentation relating to each item of business on the Agenda are on file in the office of the City Clerk and are available
for public review. Any questions concerning any Agenda item may be directed to the Community Services Department Secretary,
799 Moorpark Avenue, Moorpark, CA 93021 (805) 529 -6864, ext. 227.
Parks and Recreation Commission Agenda
November 1, 1999
Page 2
8. DISCUSSION /ACTION ITEMS:
A. Consider a Name for the Park in Specific Plan 92 -1
(Carlsberg). Staff Recommendation: Provide a
recommendation to the City Council of a name for the park
in Specific Plan 92 -1 (Carlsberg). (Continued from
9/29/99)
B. Consider Playground Equipment Design for Peach Hill Park.
Staff Recommendation: Approve the Miracle playground
equipment design (Attachment A).
9. ANNOUNCEMENTS /FUTURE AGENDA ITEMS:
10. ADJOURNMENT:
MINUTES OF THE PARRS AND RECREATION COMMISSION
Moorpark, California
1. CALL TO ORDER:
September 29, 1999
Chair Dubreuil called the meeting to order at 6:45 p.m.
2. THE PLEDGE OF ALLEGIANCE:
The Pledge of Allegiance was led by Commissioner Hare.
3. ROLL CALL:
Present: Commissioners Joseph Catrambone, Tina Hare, and
Chair June Dubreuil. Commissioners Thomas Pflaumer and
Sandra Thompson were absent.
Staff Present: Mary Lindley, Director of Community
Services, and Patty Lemcke, Administrative Secretary.
4. PROCLAMATION, COMMENDATIONS AND SPECIAL PRESENTATIONS:
Staff's Monthly Report.
Mary Lindley deferred her oral report until the next
regular Parks and Recreation Commission Meeting.
S. REORDERING OF, AND ADDITIONS TO, THE AGENDA:
None.
6. PUBLIC COMMENTS:
None.
7. CONSENT CALENDAR:
A. Approval of the Parks and Recreation Commission
Minutes of July 19, 1999. Staff Recommendation:
Approve as presented.
B. Parks Quarterly Report. Staff Recommendation: Receive
and file report.
Parks & Recreation Commission Minutes
September 29, 1999
Page 2
C. Spring Recreation Quarterly Report. Staff
Recommendation: Receive and file report.
D. CPRS Conference Attendance. Staff Recommendation:
Receive and file report.
Commissioners Catrambone, Hare, and Chair Dubreuil
stated that they plan on attending the Conference in
March 2000.
MOTION: Commissioner Hare moved to approve the Consent
Calendar as presented. Commissioner Catrambone
seconded. The motion was carried 3 -0. Commissioners
Pflaumer and Thompson were absent.
8. DISCUSSION /ACTION ITEMS:
A. Consider Replacement of Playground Equipment at Peach
Hill Park and Campus Canyon Park. Staff
Recommendation: Select two Parks and Recreation
Commissioners to serve as an ad hoc committee to make
a recommendation to the full Commission on the type
and design of replacement playground equipment for
Peach Hill Park and Campus Canyon Park.
Ms. Lindley explained that at September's park tour,
the Commission and staff had discussed the formation
of an ad hoc committee to present ideas to the full
Commission for appropriate play equipment at the
aforementioned parks. The ad hoc committee would visit
other park sites in surrounding cities to assist in
establishing new ideas.
MOTION: Commissioner Hare moved to appoint Commissioner
Catrambone and Chair Dubreuil to serve on the ad hoc
committee, and present their recommendations for the
playground equipment to the full Commission.
Commissioner Catrambone seconded. The motion was
carried 3 -0. Commissioners Pflaumer and Thompson were
absent.
Parks & Recreation Commission Minutes
September 29, 1999
Page 3
B. Consider 3rd of July Event for the Year 2000. Staff
Recommendation: Provide a recommendation to the City
Council regarding a 3rd of July Fireworks Event in
2000.
Ms. Lindley gave a brief overview of the history of
the City's fireworks event, and stated that due to the
loss of the former parks' assessment district, it was
necessary to eliminate this annual event in FY
1998/99. Since the passing of the current park
assessment, it is now feasible to amend the budget to
include a fireworks program if approved by the City
Council. As in the past, the City will solicit
businesses and organizations for contributions.
The Commission supported staff's recommendation, and
Chair Dubreuil suggested the City advertise for
volunteers to serve on an ad hoc committee. The
committee would assist staff with the planning and
organizing of the event.
MOTION: Commissioner Catrambone moved to recommend to City
Council the inclusion of a fireworks event in FY
1999/2000, and to consider the formation of an ad hoc
committee of volunteers to assist the City.
Commissioner Hare seconded. The motion was carried 3-
0. Commissioners Pflaumer and Thompson was absent.
C. Consider a Name for the Park in Specific Plan 92 -1
(Carlsberg). Staff Recommendation: Provide a
recommendation to the City Council of a name for the
park in Specific Plan 92 -1 (Carlsberg).
Ms. Lindley gave an update on the current status of
the park and the amenities planned, and stated that
presently, the approximate date for completion is May
2000. She then reviewed the City's Park Naming Policy.
Commissioner Hare suggested that this item be
continued until the next regularly scheduled meeting,
since two of the Commissioners were absent.
Parks & Recreation Commission Minutes
September 29, 1999
Page 4
Chair Dubreuil invited the public to submit their
suggestions. She requested that staff provide street
names adjacent to the park for consideration, with
translation, when necessary.
CONSENSUS: By consensus, the Commission agreed to continue
this item until the next Parks and Recreation
Commission meeting, when the full Commission
would be present.
9. ANNOUNCEMENTS /FUTURE AGENDA ITEMS:
None.
10. ADJOURNMENT:
Chair Dubreuil adjourned the meeting at 7:15 p.m.
APPROVED:
Respectfully submitted, JUNE DUBREUIL
CHAIRMAN
Patty Lemcke
Administrative Secretary
MINUTES OF THE SPECIAL PARKS AND RECREATION
COMMISSION MEETING PARK TOUR
Moorpark, California
1. CALL TO ORDER:
September 19, 1999
The meeting was called to order at 12:15 p.m.
2. ROLL CALL:
Present: Commissioners Joseph Catrambone, Thomas
Pflaumer, Sandra Thompson, and Chair June Dubreuil.
Commissioner Tina Hare was absent.
Staff Present: Mary Lindley, Director of Community
Services; Allen Walter, Supervisor of Maintenance and
Operations; and Patty Lemcke, Administrative
Secretary.
3. PARK TOUR:
Community Center Park
Chair Dubreuil inquired as to utilizing this park for
placement of some of the seniors' amenities, since its
location is next to the Senior Center. Ms. Lindley
explained that the Community Center Park is very
heavily used during the day, and the size of the park
could not accommodate the seniors needs.
Villa Campesina Park
The installation of play equipment at some future date
was discussed. Ms Lindley stated that two picnic
tables are currently on order.
Glenwood Park
Ms. Lindley pointed out a large portion of open sand
area by the playground equipment, and utilizing it can
be addressed at a later date. She also stated that
plans and cost to install the necessary equipment to
meet ADA standards will be provided to the Commission.
Commissioner Dubreuil indicated that when the time
comes to consider a Skatepark, Glenwood Park should be
considered.
Arrovo Vista Communitv Park
It was noted that the handicapped parking spaces at
the gravel parking lot need to allow easier access
into the park. There are currently wooden poles being
used as car stops, which impede entrance directly from
the lot.
The Commissioners discussed the placement and
aesthetics of the storage bins belonging to the sports
organizations. The location of the proposed restroom
was also discussed.
The location for the senior sports was discussed.
Tierra Rejada Park
This park is very heavily used on the weekends, and
park staff has done a great job on keeping it well
maintained.
Mr. Walter informed the Commission that basketball
hoops are on order. They are continually broken from
participants "hanging" on them.
Peach Hill Park
Since the purchase of new play equipment is scheduled
in the near future, types and styles were discussed in
general. It was suggested that a more "challenging"
theme may be considered for this park, focusing on
children 6 years of age and older.
Mr. Walter explained that the drinking fountain behind
the backstop needs to be replaced, and it will be
located to another spot.
Campus Park
Mr. Walter explained that the restrooms are
temporarily closed to repair a plumbing problem.
MAPLemcke \M \Commission\Park Tour - Sept.doc
This neighborhood park tends not to be heavily used on
the weekends. This is probably due to its location.
Griffin Park
The Commissioners all agreed that the new play
equipment looks great. One piece needs to be repaired,
and since the installation has been so recent, it was
discussed that another piece of equipment may be
better suited for the structure. This would eliminate
having to replace the same part again, if the
replacement breaks as quickly.
A ramp to complete the ADA requirements for the
playground will be researched.
Campus Canyon Park
Ms. Lindley stated that replacement of the play
equipment is scheduled for this fiscal year. It was
noted that parking is a problem. Mr. Walter stated
that the park is heavily used all week. Parking can be
a problem, and since space is very restricted, it does
not seem feasible to install a parking lot.
4. ADJOURNMENT:
The Park Tour was adjourned at 3:10 p.m.
APPROVED:
Respectfully submitted:
June Dubreuil
Chairperson
Patty Lemcke
Administrative Secretary
M: \PLemcke \M \Commission\Park Tour - Sept.doc
AGENDA REPORT
PARKS AND RECREATION COMMISSION
CITY OF MOORPARK
TO: The Parks and Recreation Commission
FROM: Mary Lindley, Director of Community Serviced
Prepared by: Allen Walter, Supervisor of Maintenance and
Operations
DATE: October 18, 1999 (for November 1, 1999 meeting)
SUBJECT: Parks Quarterly Report
July 15 to October 15, 1999
• MONTE VISTA PARK: Sunridge Landscaping began regular
maintenance on October 1. Park staff had been performing all
maintenance (trash, weeds, etc.) to aid in recouping
renovation costs incurred when the park was reopened on July
1. Some new growth of ground cover is apparent and the overall
appearance is good.
• VIRGINIA COLONY: Staff up- graded the raised planters with
agapanthas and raps to improve the Park's entry appearance.
• GRIFFIN PARK: The irrigation enclosure along Campus Drive was
planted with pyracanthas to improve the appearance of the Park
and hide the fence enclosure.
Sunridge Landscape was notified of a gopher problem and they
added additional traps. If needed, they will seek outside
assistance from a pest control company, as per contract.
The balance of the new playground equipment was delivered on
July 19, and installed. The playground "stepping platform" was
broken from normal use and was removed. The contractor is
replacing the broken section with a different style and more
durable platform device.
• CAMPUS CANYON PARK: The replacement picnic table was delivered
and installed.
Parks Quarterly Report
Page 2
Three Magnolias behind the ballfield backstop are diseased and
will soon be dead. They will be replaced with three
Carrotwoods, which are resistant to the bacteria that infected
the Magnolias.
Staff is working with Pederson Fence Company to schedule and
coordinate replacement of the wrought iron fence along the
west -side of the park.
• CAMPESINA PARK: Table designs were researched for installation
at the two designated picnic areas. Four manufacturers were
contacted for bid requests. Bids close October 25.
An irrigation problem was corrected by Sunridge. The well
water was damaging the sprinklers, causing poor irrigation of
the park. Sunridge installed a filter, which corrected the
problem and increased the irrigation flow. Vandalism to the
sprinklers is also a weekly problem.
• PEACH HILL PARK: The softball lights were replaced and two
light sockets on the northwest side were moved to redirect the
light from a residence after a complaint was received.
Sand and debris were placed in the men's room urinal, and a
plumbing service was called to repair.
Park staff has found several sand 'bee" nests in the
playground sand. Control measures have begun, but the problem
is still present. This is a seasonal problem that occurs in
late summer.
A large Pine tree located along the north wall split and
required Delta Tree service to respond. The limb was removed.
Eight additional trees were thinned to prevent damage.
The drinking fountain behind the backstop needs to be
replaced. All securing devices inside the fountain have become
rusted and will no longer support the water bowl in place. A
new I -beam fountain can be purchased for approximately $1,090.
• ARROYO VISTA PARK: Tennis court construction is completed. A
cost is being prepared for a 2- program clock to operate the
tennis court light settings. This allows for two separate
programs to follow the days of the week, since weekend court
Parks Quarterly Report
Page 3
times are different than weekdays. Pederson Fence Company
enclosed the tennis court electrical boxes. Staff is also
obtaining cost proposals for landscaping.
The red curbs at the Center were re- painted.
A pump truck was ordered to clean out the sewer pump storage
facility. To prevent costly sewer pump grinder repairs, this
service will be conducted on a quarterly basis.
The mainline in the lighted ballfield was repaired, and
watering has now been returned to the automated sprinkler.
The south slope by the tennis courts slid down onto the turf.
The soil was wet and loose. City irrigation was turned off on
the slope but the with tennis court construction and
irrigation modification /repair the valves may have been
returned to the on position by the tennis court contractor.
The slide did not damage the park's turf.
Weed abatement of the area just east of the football field at
AVCP, near the line of Pepper trees was conducted after the
City received notice from the Ventura County Fire Protection
District. In addition, the Pepper trees had to be lifted;
i.e., the lower branches removed. The weed abatement was
necessary because activity has increased and the adjacent area
is now used for parking. The work was completed and the Fire
Department was notified.
The electrical transformer that operates the well controls
burned out on two occasions as a result of Packer Football's
use of a connected electrical outlet. The outlet has been
disconnected and Packer is operating a small generator on
Saturdays to power its sound system and scoreboard.
Bookman and Edmonston Engineering tested the well water on
September 28. This was part of a project undertaken by
Calleguas Water District. The City was provided with the test
results of the AVCP well water.
• POINDEXTER PARK: Recycled fibar from Country Trail Park
playground was spread in the planters.
Parks Quarterly Report
Page 4
Wall caps along pavilion wall bench were replaced, after they
were broken by patrons.
Unknown person(s) turned off the backflow on two occasions.
Some turf loss occurred. Sunridge removed the handles to
prevent further problems.
The out field baseball fence became unhinged, making -urf
maintenance difficult. The fence was removed after Li_zle
League season ended.
• COUNTRY TRAIL PARK: Eleven replacement trees were planted to
replace eleven frost damaged trees. The trees were monitored
until no regrowth appeared and were dead.
• CAMPUS PARK: The phone company replaced the parts of the
telephone that were vandalized.
Campus Park restroom sewer system has been damaged by tree
roots. The existing pipe is clay and has been broken by the
large tree roots in the park. The new pipe, plastic PVC, will
have to be installed from the restroom to the street. The cost
is $5,600. The restrooms will be closed until a new pipe can
be installed. The repairs should be completed by November 5.
• TIERRA REJADA PARK: Unknown persons vandalized the windscreen
in the court closest to the basketball court. This was the
second time, making the damaged section irrepairable. A
replacement panel was located and installed.
• ALL PARKS: City backflows located at city parks are being re-
certified by in -house staff.
Park staff completed the park playground annual inspection,
and rototilled all park playgrounds the week of September 7.
A water audit of all parks was conducted to determine budget
vs. use to date. Report on file.
MEMORANDUM
TO: Steve Kueny, City Manager
FROM: Stephanie Shaw and Eric Dombrowski, Recreation Coordinators
DATE: October 15, 1999
SUBJECT: Quarterly Report on Recreation Programming
Summer Quarter: June - September 1999
This memo serves as a review and analysis of summer 1999 Recreation division programs. This report also reflects
staff's efforts to identify direct costs for each program. Direct costs are all costs for a program with the exception of
staff time. Part time staff costs are included in the total cost for each program. Coordinator and Superintendent
hours are indicated at the end of each program section.
SUMMER CAMP
Summer Camp revenue increased in 1999. The reinstatement of the "choose your days" registration policy, a slight
decrease in camp fees, and extensive publicity are factors contributing to this increase. While the number of
children participating in Camp decreased slightly, the average daily attendance saw a sharp increase.
Staffing continues to be an issue. The sudden departure of the Camp Director impacted heavily on the full -time
staff. Additionally, the loss of several camp staff members toward the end of the summer and resulted in a staffing
shortage which required full -time and office staff to fill in.
Summer Camp
1999
1998
1997
Participants
211
233
325
Average Per Day
86
68
80
Direct Costs
$11,137
$17,970
$18,618
Part Time Staff Costs
$36,915
$35,986
$35,523
Total Costs
$48.052
$53,956
$54,141
Gross Revenue
$99,351
$84,401
$82,489
Net Revenue
$51,299
$30,445
$28,348
Direct Cost Per Participant
$52.78
$77.12
$57.28
Total Cost Per Participant
$227.73
$231.57
$166.58
Gross Revenue Per Participant
$470.86
$362.23
$253.81
Net Revenue Per Participant
$243.12
$130.66
$87.22
Coordinator Hours (approximate)
300
150
52
Superintendent Hours (approximate)
25
125
48
SUMMER CLASSES
Summer class registrations continue to increase each year. The cancellation rate continues to decrease slightly, and a
larger percentage of classes are filling to capacity. Continued growth is anticipated in the future.
Recreational Classes
1999
1998
1997
Students
647
510
393
Classes Offered
84
70
65
Ran
75
55
Canceled
9(10.7 %)
8(11.4 %)
10(15 %)
Gross Revenue
$26,674
$18,220
Instructor payments
$14,392
$9,781
Supplies
$0
$0
Refunds and credits
$3041
$1,900
Net Revenue
$9,241
$6,539
Direct Cost Per Participant
$22.24
$19.17
Gross Revenue Per Participant
$41.22
$35.73
Net Revenue Per Participant
$14.28
$12.82
Coordinator Hours (approximate)
35
40
SUMMER ADULT LEAGUES
The adult sport's program continues to hold steady with the exception of Adult Basketball, which did see a slight
decrease in registration. A continued effort to start a volleyball program was unsuccessful despite a strong
promotional effort, which included direct mailings to Moorpark businesses.
Softball
1999
1998
1997
Teams
36
36
33
Supply Costs
$3,208
$2,884
Facility Costs (Lights)
$1,624
$1,588
Direct Costs
$4,832
$4,472
Part Time Staff Costs
$1,562
$1,215
Total Costs
$6,394
$5,687
Gross Revenue
$12,672
$12,879
Net Revenue
$6,278
$7,191
Direct Cost Per Team
$134.22
$124.22
Total Cost Per Team
$177.61
$157.97
Gross Revenue Per Team
$352
$357.75
Net Revenue Per Team
$174.39
$199.75
Coordinator Hours
50
50
Basketball
1999
1998
1997
Teams
10
16
16
Supply Costs
$547
$595
Facility Costs (Lights)
$20
$23
Facility Costs (Gym at $12 per hour)
$1,080
$1,440
Direct Costs
$1,647
$2,058
Part Time Staff Costs
$1,250
$1,875
Total Costs
$2,897
$3,933
Gross Revenue
$3,145
$5,162
Net Revenue
$248
$1,229
Direct Cost Per Team
$164.70
$128.62
Total Cost Per Team
$289.70
$245.81
Gross Revenue Per Team
$314.50
$322.62
Net Revenue Per Team
$24.80
$76.81
Coordinator Hours
20
24
Volleyball
1999
1998
1997
Canceled
Canceled
Canceled
Coordinator Hours
5
3
Women's League
1999
1998
Participants
52
48
Supply Costs
$501
$390
Facility Costs (Lights)
$4.70
$147
Direct Costs
$506
$537
Part Time Staff Costs
$69
$87
Total Costs
$575
$624
Gross Revenue
$1,501
$1,200
Net Revenue
$926
$576
Direct Cost Per Participant
59.73
$11.18
Total Cost Per Participant
$11.06
$13.00
Gross Revenue Per Participant
$28.87
$25.00
Net Revenue Per Participant
$17.81
$12.01
Coordinator Hours
10
16
1997
Not offered
SUMMER YOUTH LEAGUES
Youth sports registrations have also been holding relatively steady in comparison with past years. The Junior
Basketball League continues to be the most popular youth sport's program. The price of the program in the upper
division was raised due to an increase in shirt prices and referee fees, which did not negatively affect the registration
numbers.
Junior Basketball League
Participants
Supply Costs
Facility Costs (Lights)
Facility Costs (Gym at $12 per hour)
Direct Costs
Part Time Staff Costs
Total Costs
Gross Revenue
Net Revenue
Direct Cost Per Participant
Total Cost Per Participant
Gross Revenue Per Participant
Net Revenue Per Participant
Coordinator Hours
JBL Upper Division
Participants
Supply Costs
Facility Costs (Lights)
Facility Costs (Gym at $12 per hour)
Direct Costs
Part Time Staff Costs
Total Costs
1999
68
$1,698
$36
$960
$2,694
$275
$2,969
1998
81
$1,847
$16
$960
$2,823
$291
$3,114
$3,196
$3,564
$227
$450
$39.62
$34.85
$43.66
$38.44
$47
$44.00
$3.34
$5.55
20
25
1999
50
$1,249
$27
$720
$1,996
$221
$2,217
1998
41
$912
$8
$480
$1,400
$143
$1,543
Gross Revenue $2,600 $1,927
Net Revenue $383 $384
1997
80
1997
56
Direct Cost Per Participant
$39.92
$34.14
Total Cost Per Participant
.344.34
$37.63
Gross Revenue Per Participant
$52.00
$47.00
Net Revenue Per Participant
$7.66
$9.36
Coordinator Hours
25
25
T -Ball League
1999
1998
Participants
16
23
Direct Costs
$364
$679
Part Time Staff Costs
$70
$69
Total Costs
$434
$748
Gross Revenue
$704
$1,012
Net Revenue
$270
$263
Direct Cost Per Participant
$22.75
$29.52
Total Cost Per Participant
$27.13
$32.52
Gross Revenue Per Participant
$44
$44.00
Net Revenue Per Participant
$16.88
$11.43
Coordinator Hours
15
15
1997
Canceled
SUMMER YOUTH SPORTS CAMPS
A variety of sports camps were offered during the summer that on a contract basis. One major change that was a
contributing factor to the revenue decrease for the 1999 season was the fact that only one basketball camp was
offered as opposed to two in previous years. The instructor was not able to hold two this year. Skyhawks Sport's
Academy was also added to the camp instructor list this season but only 2 out of 4 camps ran.
Sports Camps
1999
1998
1997
Students
76
102
149
Camps Offered
6
16
7
Ran
3
8
5
Canceled
3 50%
8 50%
2 29%
Instructor payments
$4,282
$5,188.8
$8,045
Supplies
$0
$0
$0
Direct Costs
$4,282
$5,188.8
$8,045
Gross Revenue
$7,660
$9,519
$12,303
Refunds and credits
$770
$1,067
not available
Net Revenue
$2,608
$3,264
$4,258
Direct Cost Per Participant
$56.34
$50.87
$53.99
Gross Revenue Per Participant
$100.79
$93.32
$82.57
Net Revenue Per Participant
$34.32
$31.95
$28.57
Coordinator Hours
18
15
TEEN PROGRAMS
Teen programs continued to struggle over the summer 1999 quarter with the exception of the Teen Babysitting class
and the skatepark. Even with an increased level of advertising including direct mailings, and news releases, the
programs offered did not attract a large number of teens.
Teen Classes 1999 1998 1997
Teen Baby Sitting Course 15 (Average 15 (Average) Not offered
Beginning Guitar Not offered 5 8
Events
1999
1998
1997
Pool party
Not offered
Canceled
0
Beach trips
Not offered
Canceled
Not offered
Skate Nights
Not offered
Canceled
25 (Average)
Band Jams
Not offered
June -70
Not offered
Net Cost
$2,330.29
July- canceled
$505.30
August - canceled
September -75
Late Night Basketball
Not offered
4 (average)
Not offered
Moonlight Rock N Bowl
Not offered
Canceled
Not offered
Skatepark
227
23 registered
Not offered
Skate Contests (2 offered)
25
Not offered
Not offered
Back to School Skate Party (9/24)
75
Not offered
Not offered
;Movie Nights (2 offered)
6
Not offered
Not offered
Teen Junior Basketball League
Canceled
Not offered
Not offered
Coordinator Hours
100
62
Superintendent Hours
Not available
35
BROCHURE
The following information does not include the City Clerk's portion of the brochure costs for the City Newsletter.
Printing costs continue to rise. Bids were solicited in an effort to determine if less expensive printing alternatives
were available. The printer currently used by the City was found to be by far the least expensive.
Brochure Costs
1999
1998
1997
Printing Cost
$3,138.95
$2,514.29
$1,698.75
Mailing Cost
$1,091.34
$1,066.83
$876.55
Total Cost
$4,230.29
$3,581.12
$2575.30
Ad Revenue
$1,900
$1,460
$2070
Net Cost
$2,330.29
$2,121.12
$505.30
FACILITY RENTALS
The division processes rentals for Arroyo Vista Recreation Center and all neighborhood parks. The costs shown for
AVRC rentals include rental coverage by part time staff. Please note that many permits include multiple dates. For
example, AYSO has been issued one permit for the full season, which includes multiple dates. Please also note that
staff and direct cost figures are not available for park rentals. Also, these figures cover all permits processed from
July 1 through September 30.
Park Rentals
AVRC Rentals
Permits
Gross Revenue
Gross Revenue Per Rental
Coordinator Hours
Superintendent Hours
Permits
Part Time Staff Hours
Part Time Staff Costs
Total Costs
1999
1998 1997
219
279 Not available
$11,127
$10,579
$50.81
$37.91
40
30
Not available
24
1999 1998
1997
13
17 Not available
60
99.5
$521
$845.75
$521
$845.75
Gross Revenue $2,740 $6,114
(Please note: Somerset Auctions did not make
a reservation in 1999. In 1998, their rental brought in $4,000)
Net Revenue $2,219 $5,268
Staff Cost per Rental
Gross Revenue Per Rental
Net Revenue Per Rental
Coordinator Hours
Superintendent Hours
340.08
349.75
S210.77
',x'359.65
$170.69
$309.88
10
10
Not available
5
MOORPARK PARKS AND RECREATION COMMISSION
AGENDA REPORT
TO: Park and Recreation Commissioners
FROM: Stephanie Shaw, Recreation Coordinator
DATE: October 27, 1999 (Meeting of November 1, 1999)
SUBJECT: Camp Moorpark Survey Results
BACKGROUND
At the conclusion of the summer 1999 session of Camp Moorpark,
surveys were mailed to all participating families. The survey
consisted of ten questions covering different aspects of the
program, including staffing, facilities, activities, and the
customer's overall experience.
Of the 159 surveys sent, 33 (20.7 %) were returned. Attached are
the survey results, along with a copy of the original survey.
STAFF RECOMMENDATION
Staff recommends that the Park and Recreation Commission receive
and file this report.
CAMP MOORPARK SURVEY RESULTS
Surveys were sent to all families who participated in Camp Moorpark for the summer 1999 session.
Of the 159 surveys sent, 33 were returned.
Were office staff courteous and Did your children enjoy the activities at
helpful? camp?
■Always ■ Usually ❑ Sometimes O Never ■Always ■ Usually O Sometimes ❑ Never
6 %, 0% 6 %,
! 24% 070%
6% 33%
55%
Were Camp staff courteous and Customer's overall experience with
helpful? Camp Moorpark
i I ,
I ■ Always ■ Usually O Sometimes O Never I ■ Excellent ■ Good ❑ Fair ❑ Poor
6 %I
9% 0%
15% 33% i
49%
42 %�
46%
Facility Rating Children attend camp primarily for:
0 Excellent ■ Good ❑ Fair ❑ Poor ■ Need Supervision ❑ Summer Activities
0%
o i
6 / 30%
39%
61 %
64%
Comments from parents:
Reasons for participating in Staff seemed inexperienced (3 parents)
Camp Moorpark Discontinue water day (3 parents)
Discountinue train trip (2 parents)
30 Lice was a problem (3 parents)
25 - — fly IW -- - -- Take all campers on trips (3 parents)
20
15 - — — Add swimming /beach trips (5 parents)
15 _— — Add roller hockey /skating (2 parents)
0
The following were suggested by only one parent:
Qo```� �eey Gay` °� ey ate. °ey `� Add: hikes, library, amusement park, water
park, enrichment programs, marbles, Stage
Coach Inn, story time
Remove: Golf N Stuff, Nintendo 64, Space
Play, Chuck E. Cheese
City of Moorpark, Community Services
Camp Moorpark Program Evaluation
Your input is very important to the future planning of Camp Moorpark. Please take a moment to fill out this
brief survey to let us know what you think!
1. Were office staff courteous and helpful?
Always Usually _Sometimes Never
Comments:
2. Were camp staff courteous and helpful?
Always Usually Sometimes Never
Comments:
3. Please rate the facility:
Excellent Good Fair Poor
Comments:
4. Did your child enjoy the activities at Camp?
Always F� Usually r Sometimes Never
Comments:
5. Overall, how would you rate your experience with Camp Moorpark?
Excellent Good _ Fair Poor
Comments:
6. Which statements best describe your reason for participating in Camp Moorpark?
Flexible registration policy Camp Moorpark's location Activities at Camp Moorpark
Ll Reasonable registration fees Other camps not available Other:
7. Do your children come to camp primarily because:
-. They want to do something for the summer ❑ They need supervision for the summer
8. Which activities or field trips you would like to see ADDED to camp?
9. Which activities or trips would you like to see REMOVED from camp?
10. Other comments, recommendations, or concerns:
Thank you for your time! We appreciate you input. Surveys can be dropped off at the Arroyo Vista Recreation
Center or mailed to: City of Moorpark, attn: Camp Moorpark, 799 Moorpark Avenue, Moorpark CA 93021.
MOORPARK PARRS AND RECREATION COMMISSION
AGENDA REPORT
TO: The Parks and Recreation Commission
FROM: Mary R. Lindley, Director of Community Services/,r-
DATE: October 20, 1999 (Meeting of November 1, 1999)
SUBJECT: Consider a Name for the Park in Specific Plan 92 -1
(Carlsberg)
DISCUSSION
On September 29, the Commission was asked to consider a name for
the park under construction in Specific Plan 92 -1 (Carlsberg).
The Commission recommended that this item be brought back to its
November meeting to allow members additional time to consider
potential names.
The City has a Park Naming Policy (see Attachment A) which was
last approved by the City Council in 1994. In summary, the
policy states that the Parks and Recreation Commission will
consider park names and forward a recommendation to the City
Council. Names may be selected that identify the geographic
location of the new park, or, when possible, the street on which
the park is located. In special circumstances, the park may be
named to recognize a national or historical event. Names
proposed by the Commission will be considered by the City
Council. The approved name will be adopted in the form of a
Council resolution.
At its September 29 meeting, the Commission requested that staff
identify potential names in Spanish and Italian (the residential
development planned for the Carlsberg Specific Plan is called
Serenata, which is Italian for Serenade). The attached list
(Attachment B) contains possible park names for the Commission's
consideration. Additionally, the September 29 Agenda Report
included three possible names: Carlsberg Park, Mesa Verde Park,
Science Park.
STAFF RECOb24ENDATION
Staff recommends that the Commission select a name for the park
in Specific Plan 92 -1 and forward its recommendation to the City
Council for consideration.
attachment
Attachment A
City Park Naming Policy
(Adopted on August 10, 1994)
1. The City Council will direct the Parks and Recreation
Commission to make recommendations on names for all new park
projects during or before park construction.
2. City parks may be named in a manner which identifies the
geographic location of each park. Whenever possible the name
of a street, or the street upon which the park is located, may
be part of the park name. In special circumstances, park
names could be designated to recognize a national or
historical event.
3. The City Council will consider the Parks and Recreation
Commission's recommendations and will adopt the chosen park
name by resolution.
Attachment B
Name
1. Valle del Sol
2. Villa Serena
3. Cortile Verde
4. Collina Verde
5. Montebbello
6. Porta Portese
7.
Serenata
8.
Salito Sereno
9.
Salito Bello
10.
Salito Verde
11.
Prato Bello
12.
Prato Sereno
13.
Prato Verde
14.
Catena Sereno
15.
Catena Bella
16.
Catena Verde
17.
Vista Montana
18.
Montana Verde
19.
Cerro Vista
20.
Vista Carson
21.
Cerro Verde
22.
Villa Montana
23.
Scenic View
24.
Sunset View
Park Names
Translation
Valley of the Sun Italian
Serene Village
Italian
Green Courtyard
Italian
Green Hills
Italian
Beautiful Mountains
Italian
No direct translation, but in Rome, this term is used to refer to
large gatherings, such as an open market. Italian
Serenade Park
Italian
Peaceful Hillside
Italian
Beautiful Hillside
Italian
Green Hillside
Italian
Beautiful Meadow
Italian
Peaceful Meadow
Italian
Green Meadow
Italian
Peaceful Ridge
Italian
Beautiful Ridge
Italian
Green Ridge
Italian
Mountain View
Spanish
Green Mountain
Spanish
Mountain Range View
Spanish
Canyon Vista
Spanish
Green Mountain Range
Spanish
Mountain Villa
Spanish
MOORPARK PARKS AND RECREATION COMMISSION
AGENDA REPORT
TO: The Parks and Recreation Commission
FROM: Mary K. Lindley, Director of Community Services
DATE: October 26, 1999 (Meeting of November 1, 1999)
SUBJECT: Consider Playground Equipment Design for Peach Hill
Park
BACKGROUND
At its September 29 Special Meeting, the Commission selected a
sub - committee, tasked with developing a recommendation for
playground replacement equipment for Peach Hill and Campus
Canyon parks. The sub - committee is comprised of Chair Dubreuil
and Commissioner Catrambone. This Agenda Report serves as the
sub - committee's recommendation regarding Peach Hill Park.
The adopted FY 1999/2000 Budget includes $50,000 to replace the
large wooden playground equipment at Peach Hill Park. There are
no plans to replace the surface material (sand), so the total
budget will be allotted to the purchase and installation of play
equipment.
The subcommittee met twice. The first meeting was held at
Rancho Simi Community Park in Simi Valley. The purpose of that
meeting was to look at the play equipment manufactured by
Miracle. Based on positive comments from the subcommittee
members, a Miracle representative prepared a draft design, which
was reviewed by the subcommittee at its second meeting.
The design provided with this Agenda Report (Attachment A) is a
result of the subcommittee's input. The subcommittee felt that
the new equipment should offer more challenging play
opportunities and features not found at the other parks. The
proposed design consists of equipment with a main "center stage"
(base height - 616 ") from which kids can access a number of
Peach Hill Playground Equipment
page 2
challenging slides and climbing apparatus, and a secondary
"center stage" (base height - 31), with less challenging
features. Note that the main stage has a slanted "climbing
wall" (height - 616") feature that is not present at any of the
City's existing park playgrounds (Attachment C).
Additionally, while not shown on the plans, the proposed
playground design includes a set of four swings (two bays with
two swings each - Attachment D), to replace the old wooden set
that is currently in place. The total estimated cost to
purchase the equipment is $35,000. The estimated removal and
installation cost for the project is $15,000. The City will
need to bid the installation work; therefore, the cost may vary
after bid proposals are received. The total estimated project
cost, including purchase and install, is $50,000. The proposed
playground design leaves little, if any, contingency for unseen
project adjustments.
The subcommittee expressed an interest in an independent tire
swing, in addition to the proposed four -swing set. The
estimated cost to purchase and install a single tire swing is
approximately $2,300. Proceeding with this option would exceed
the existing budget. An alternative to consider is to replace
one of the proposed swing bays (two swings) with a tire swing.
The subcommittee will meet again to discuss the design for the
proposed playground equipment at Campus Canyon Park. A
recommendation will again be forwarded to the full Commission.
STAFF RECOHMNDATION
Staff recommends that the Parks and Recreation Commission
approve the Miracle playground equipment design (Attachment A).
M: \MLindley \PARKS \peach hill play equip commagd.doc
In
rl
Q1
tD
tD
rn
N
V
N
r7
m
OD
W
m
t`
v
14
N
Y
Q
a
w
j
u
CE
rl
N
m �dgrorm�rONvay�
00'
M Wa Cw�rurnr Mduat iqf� Ginmidon •
�1 ' 91end1aak for Fy11M lst� r•f�l^/ "Wpm -''
w 4wm%Vmd for
N School Age Children
u lban an M krya dlpaAllw In to sww" of
0 *ddmn of *n%w a9••• F%m#a swat M roaporldWe
for briOng their to the" 6001V.. Uwt wa
0 ad ad* fa trk oNdan'a ur&&m and
npaamwsm.
M OEM =N N90 PR04E7IM SUWACE 15 RECLINED
ARMIM •M MAY STSM9L
PEACH HILL MOORPARK A kaAime4 A-
MOORPARK
PEACHTREEX.dRg
October 26. 199
RI h — J' 111AWRR POINI
ar
((a) 1]e' FOM 714 -sea
(I�DEta( opl 714 -M -S
(1) 1EI L lACDER 714 -e16-e
(1) TRY aws 4 -711 -5
4??�� 0601 OCL 714 -20-5
111 lwY R= 7} -711 -3
1
MW CAL
uooal
714 -a3- -]
LOW
WHOM
714-#8
MIRACLE
Corgi (a11P{E!(f CWPMY
v
m
w
CS
Q
a
In
a�
a)
�D
rl
v
N
m
N
G)
G)
a)
N
t)
0
1%
1111
list T
I It I its
is
I"
11
1��
is
T T II�+s�s��::
110141, 1 10
Is
r^
� 1
tl
n -■
-. -
Alt
4
�• ♦ ♦ •
rot 8
_- RAN
sA's so
•1 ,��
Its
—� - _ - _ _— +- -•III♦ .
I
A
'It's 410 4w
- #e 41P
44W 40 41? 4F#4v 4w
/1
#898
Ji' r
'17
�Nl
20
A iA
#724 #7
rC
#860
#996-1
1,1111
tj
.2
995 #972
I
#7S7-2
..;.-P
.6 '46
..... .....
41
#755 '0
J-A
CM
#968
942
Ji' r
'17
�Nl
20
A iA
#724 #7
rC
#860
#996-1
1,1111
tj
.2
995 #972
I
#7S7-2
..;.-P
.6 '46
..... .....
41
#755 '0
VO
1+415 - Vncn4 ___D
Ground Space 5'x l 9' O Sin x 5 8
Swing Hangers Protecsive Area 24'x3l'(73mx94m1
Shipping Weight 465 Ibs. (2L 1 kgr
Single Post Swing (Fmme only)
Ground Space I ' x 11' (.3m x 3.7m)
ProtectimArea 32'x24'19.8mx73m)
Shppng Weight 165 bt ( 75 kg)
II
I -Bay Kids' ChoiceTM
Arch Swing (Fining & Hangers orsy)
Ground Space 8'x 12'(24m x 3.7m)
`. Protective Area 32' x 24' (9.8m x 73m)
Shipping Weight 409 6:. (186 kg)
- t�' =
Seat Clevis (aka any)
• Standard on swing seats 4„ - k`
Tots' ChoieeTm Arch Swing racing a Flongers or*)
compliance allows only two swing seats per
no mixiny of seat styles in the same bay
Mm
2 -Bay Kids' ChoieeTm Arch Swing (Fmme 3 Hangers or*)
Ground Space 3' x 24' (2 4m x 73m)
Prorectne A•ec 32'x 36'(98mx Ilm)
Sh pp,ng We get 661 lbs 1300 kg)
Swing Hanger
• Standard on top t
�y
- `
Ground Spoor Pit 35'(Z 1 m x i 0.7m)
Protectim A e: 30's 4 7'(9. / m x 14 3m)
Shipping Weight 440 6z (200 kg)
I -Bay Tots' ChoiceTm Arch Swing
Ground Space 7'x 12'(2. 1 m x 3 Im)
Protective Arm: 30' x 24' (9. I m x 73m)
Shipping Weight 2 32 bs. (105 kg)
2 -Bay Tots' ChoieeTm Arch Swing (Forme a Hangers ony)
Ground Space. 7's 24 ,1 1 m x 73m)
orotecuveArea 30'x 36 -.91mx I Im)
Sh,pp.g Weight 31 7 bs I44 kg)