Loading...
HomeMy WebLinkAboutAGENDA REPORT 1999 0602 CC REG ITEM 11CCity of Moorpark Agenda Report To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Date: May 21, 1998 (Council Meeting 6 -2 -99) ITEM I l • G • ( ri r NPrWTZrNVV, r - kI 'VORNIA ACI !„1: 1 6�. BY: Worksgl Subject: Consider Bids for the Tierra Rejada Road Storm Drain Inlet Project EXECUTIVE SUMMARY On April 21, 1999, the City Council authorized staff to advertise for receipt of bids for the subject project. This presents the results of the bid opening held on May 20, 1999, and recommends the award of a contract for the construction of the project. DISCUSSION A. Project Scope During any moderate rain event flooding occurs at the intersection of Tierra Rejada Road and Mountain Meadow Drive, and the intersection of Tierra Rejada Road and Mountain Trail Street. The purpose of this project is to eliminate, or significantly reduce this flooding. This will be accomplished by constructing two modifications to the existing storm drain system, which are shown in Exhibit 1 and generally described as follows: Modification A: Construction of two new catch basins (one on each side of the street) on Mountain Meadow Drive just south of Rivergrove Court. These new catch basins will intercept storm flow which now runs northerly on Mountain Meadow Drive to Tierra Rejada Road, and then to the west. This intercepted storm flow will no longer reach Tierra Rejada Road. It is anticipated that the existing catch basins in and near Tierra Rejada Road will be able to handle the reduced volume. Tr inlet awd Tierra Rejada Road Inlets May 21, 1999 Page 2 Modification B: Notwithstanding the above comment regarding the anticipated improved capability of the existing drainage systems in and near Tierra Rejada Road, it is proposed that one additional improvement be constructed near the intersection of Tierra Rejada Road and Mountain Trail Street. The subject project includes construction of additional catch basins on Tierra Rejada Road just east of Mountain Trail Street. These new catch basins will further improve storm water handling capability at this intersection. B. Bid Results: Bids for the subject project were received and opened on May 20, 1998. The apparent low bidder is J &H Engineering General Contractors, Inc., with a bid of $35,801. A summary of the bid results is attached as Exhibit 2. It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. C. Fiscal Impact 1. Construction Cost Estimate: construction is as follows: Element Bid Price Contingency Total The estimated cost of 2. Total Project Cost Estimate: The costs are summarized as follows: Element Construction (& Cont.) Design Admin & Inspection Total Total ($) 35,641 4,359 40,000 estimated total project Total ($) 40,000 7,000 4,000 51,000 3. Funding Sources: This project is to be funded by the Gas Tax Fund. 4. Budget: The FY 1998/99 Budget for this project is $70,000. D. Schedule It is anticipated that construction will be completed by the end of August. Tr inlet awd 000�4�. Tierra Rejada Road Inlets May 21, 1999 Page 3 RECOMMENDATIONS Staff recommends that the City Council take the following actions: 1. Award a contract to J &H Engineering General Contractors, Inc. in the amount of $34,641 for the construction of the subject project. 2. Approve a construction contingency in the amount of $4,359 and authorize the City Manager to approve additional work, if required, for a cost not to exceed said contingency; and, 3. Authorize the City Manager to sign necessary contract documents. Tr inlet awd 0 () 05�i: v. MOUNTAIN MEADOWS SCHOOL _ n,. N vi �rn r N 11 n i O. � W 1 W VI Z < N U > m N Z <= onn O 3 0 + o v aW � ^) 0em90�',,��,e 015.00 LF OF 18' RCP O 5 =0.0707 1 •.\ `"> 0^1.��P h LF Of 18' RCP / (2)15+0. O 5= 0.3000 1 ti - --SS RCP / T 6 00 LF OF 1 -- "// o 8 RCP O 5-0.5933 O i � I rU Vi CATCH BASIN WITH LOCAL DEPRESSION N 8 m V) N! m z 18" RCP, TRENCHING, BACKFILLING I> N U IaDm U m W v h = IIm > � X I 3 n = z a I II d N W VI a vl< on d d< 0- '- <,+ /_ VI V) ® ♦ H ' U 0111 a< 0 N 1 as INN • CONTRACTOR TO FIELD VERIFY ALL EXISTING w d n U p0 OIO > « v N UTILITIES PRIOR TO CONSTRUCTION AND m- Nn •rnl m UL) ul m m NOTIFY THE CITY OF MOORPAK OF ANY vi n oloenl I =m +O+ r �� l as ~loo m + CONFLICT. O =! �e ° mo a "� o0 �m + +N NInl o rno 1 FINN �m 4 a 3 O II /j MOUNTAIN MEADOW DRIVE • I N X �' I EXIST. 1B' RCP CONSTRUCTION NOTES: (G V Is QTY- 2 EA 36 LF 2 EA 1 LS 1 EA ,rvti REVIEWED CITY OF MOORPARK: MB MB DC 2 DESIGNED DRAWN CHECKED CITY OF MOUNTAIN MEADOW DRIVE SHEET PROJ. ENG. RECOMMENDED AT RIVERGROVE COURT OF 2 46555 MOORPARK DRAWING N0 REVISION DESCRIPTION CATCH BASIN PLAN APJJATE CR Y ENGINEER -DATE ��- APPROVED LIT i 1O cmi CATCH BASIN WITH LOCAL DEPRESSION N 8 m V) O 18" RCP, TRENCHING, BACKFILLING W v AND PAVEMENT REPAIRING. � X I w W VI O PIPE JUNCTION a ® CURB, GUTTER AND SIDEWAU(EXIST. O CONCRETE COLLAR (G V Is QTY- 2 EA 36 LF 2 EA 1 LS 1 EA ,rvti REVIEWED CITY OF MOORPARK: MB MB DC 2 DESIGNED DRAWN CHECKED CITY OF MOUNTAIN MEADOW DRIVE SHEET PROJ. ENG. RECOMMENDED AT RIVERGROVE COURT OF 2 46555 MOORPARK DRAWING N0 REVISION DESCRIPTION CATCH BASIN PLAN APJJATE CR Y ENGINEER -DATE ��- APPROVED LIT LI �, EXIST. C.B. �1I11 '^1 IX TIERRA REJADA DRIVE EXIST. 30" RCP lil W W < -- EXIS7. 18" S$ --- - - -- - _- _.. .XI III 10O�' - -0++' - . _ES7. 16• W I I f _.._- EXIS7. C.B. 14'X8' R.C. BOX ` EXIST. C.B 24 +00.00 J.S. PER V.C.F.C.D. DWG. N0. Y -3 -2515 �` �Vv 24 +38.68 C/L INT. RCB & MT. TRAIL DR. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE CITY OF MOORPAK OF ANY CONFLICT. 57 +03.94 CA C.B. w =8', V =5' CB PER APWA 3_00 -2, NO LO - O 492.90 TC. 487.90 INV.- 1 O 4 NO LOCAL DEPRESSION 25 +20.42 PIPE JUNCTION PER V.C. F.C.D. STD. DwG. NO 8 _ O 481.15 INV, R.C. BOX 487.15 INV. 18" R.C.P EXIST: 18' SS -- i EXIST_ 16' y/w ON 6 L. OF 18*RCP 0S-0 .O 3 14 X8 R.C. 80 %� - 2 L.F. OF 18 "RCP O S= 0.7600 O2 1 25 +02.60 PIPE JUNCTION PER V.C.F. C.D. STD. DWG NO. 8 481.00 INV. R.C. BOX 487.00 INV. 18" R.C.P n 0 0 U I W J .Z � I � w .n a REVIEWED CITY OF MOORPARK MB UFSIGNEO -- DRAwN M6 CHECKED UC t PROJ. ENG. RECOMMENDED ____ 46555 CITY ENGINEER OATF a APPROVED 1 VI k� 57 +21.44 CA CS w -8 v -9' ... .- 1 4 C8 PER APWA STD. 300 -2 LD PER 313 -1 CASE E H3v2' 493.67 TC, 488.67 INV CONSTRUCTION NOTES: O CATCH BASIN WITH LOCAL DEPERSSION O 18" RCP, TRENCHING, BACKFILLING AND PAVEMENT REPAIRING O3 PIPE JUNCTION REMOVE EXIST. CURB, GUTTER & SIDEWALK T � V (5d QTY- 2 EA 18 LF 2 EA 1 I_ S CITY OF TIERRA REJADA RD. SHEET MOORPARK AT MTN. TRAIL DRIVE °F DRAwI " G CATCH BASIN PLAN "° r, II N � Io III a n I;I /Cy I� r IIJI z _o U mI I�I a l co IIl 'Z II 110 a O. 40, EXIS7._C.B, III EXIST. C.B,. LI �, EXIST. C.B. �1I11 '^1 IX TIERRA REJADA DRIVE EXIST. 30" RCP lil W W < -- EXIS7. 18" S$ --- - - -- - _- _.. .XI III 10O�' - -0++' - . _ES7. 16• W I I f _.._- EXIS7. C.B. 14'X8' R.C. BOX ` EXIST. C.B 24 +00.00 J.S. PER V.C.F.C.D. DWG. N0. Y -3 -2515 �` �Vv 24 +38.68 C/L INT. RCB & MT. TRAIL DR. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE CITY OF MOORPAK OF ANY CONFLICT. 57 +03.94 CA C.B. w =8', V =5' CB PER APWA 3_00 -2, NO LO - O 492.90 TC. 487.90 INV.- 1 O 4 NO LOCAL DEPRESSION 25 +20.42 PIPE JUNCTION PER V.C. F.C.D. STD. DwG. NO 8 _ O 481.15 INV, R.C. BOX 487.15 INV. 18" R.C.P EXIST: 18' SS -- i EXIST_ 16' y/w ON 6 L. OF 18*RCP 0S-0 .O 3 14 X8 R.C. 80 %� - 2 L.F. OF 18 "RCP O S= 0.7600 O2 1 25 +02.60 PIPE JUNCTION PER V.C.F. C.D. STD. DWG NO. 8 481.00 INV. R.C. BOX 487.00 INV. 18" R.C.P n 0 0 U I W J .Z � I � w .n a REVIEWED CITY OF MOORPARK MB UFSIGNEO -- DRAwN M6 CHECKED UC t PROJ. ENG. RECOMMENDED ____ 46555 CITY ENGINEER OATF a APPROVED 1 VI k� 57 +21.44 CA CS w -8 v -9' ... .- 1 4 C8 PER APWA STD. 300 -2 LD PER 313 -1 CASE E H3v2' 493.67 TC, 488.67 INV CONSTRUCTION NOTES: O CATCH BASIN WITH LOCAL DEPERSSION O 18" RCP, TRENCHING, BACKFILLING AND PAVEMENT REPAIRING O3 PIPE JUNCTION REMOVE EXIST. CURB, GUTTER & SIDEWALK T � V (5d QTY- 2 EA 18 LF 2 EA 1 I_ S CITY OF TIERRA REJADA RD. SHEET MOORPARK AT MTN. TRAIL DRIVE °F DRAwI " G CATCH BASIN PLAN "° r, City of Moorpark Exhibit 2 Bid Results: Tierra Rejada Inlet Project [File # bid T R inletsl] Page 1 of 2 Bidder >>>>> Vendor 1 Bid Opening: 20 -May -99 Name: Address: Engineer's Estimate J &H Engineering 79 Daily Drive, #169 Cit, State: Camarillo, CA 93010 Tel. No.: (805) 987 -8414 Contact Person: Howard Janotta, President Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid 1 Traffic Control 1 LS 1,000.00 1,000.00 2,500.00 2,500.00 2 18" RCP 54 LF 200.00 10,800.00 85.00 4,590.00 3 Catch Basin 4 EA 4,000.00 16,000.00 5,500.00 22,000.00 4 Local Depression 3 EA 1,000.00 3,000.00 900.00 2,700.00 5 Pipe Junction 4.00 EA 2,000.00 8,000.00 850.00 3,400.00 6 Concrete Collar 1 EA 500.00 500.00 450.00 450.00 7 Release I LS 1.00 1.00 1.00 1.00 Total 39,301.00 35,641.00 G � I City of Moorpark Exhibit 2 Bid Results: Tierra Rejada Inlet Project Page 2 of 2 [File N bid T R inletsl[ Bidder » »> Vendor 2 Vendor 3 Name: Wear Construction Co. Mendez Concrete, Inc. Bid Opening: 20- May -99 Address: 425 Blanchard Avenue 1210 Santa Paula Street Cit, State: Santa Paula, CA 93060 Santa Paula, CA 93060 Tel. No.: (805) 933 -3835 (805) 525 -8043 Contact Person: Reaford Wear Manuel Mendez Item Description Eat Qty Units Unit Cost Total Bid Unit Cost Total Bid 1 Traffic Control 1 LS 1,000.00 1,000.00 5,586.00 5,586.00 2 18" RCP 54 LF 100.00 5,400.00 208.00 11,232.00 3 Catch Basin 4 EA 5,000.00 20,000.00 3,640.00 14,560.00 4 Local Depression 3 EA 1,200.00 3,600.00 1,014.00 3,042.00 5 Pipe Junction 4 EA 1,200.00 4,800.00 1,066.00 4,264.00 6 Concrete Collar 1 EA 1,000.00 1,000.00 1,025.00 1,025.00 7 Release 1 LS 1.00 1.00 1.00 1.00 Total 35,801.00 39,710.00 0J�i •'