HomeMy WebLinkAboutAGENDA REPORT 2005 0518 CC REG ITEM 08BNOTICE OF CONTINUANCE OF CLOSED PUBLIC HEARING
A duly noticed closed public hearing regarding:
Consider General Plan Amendment No. 2001 -05,
Specific Plan No. 2001 -01, and Zone Change No.
2001 -02 for 1,650 Housing Units on 3,586.3 Acres
Located Generally North of Moorpark College and
State Route 118 on Land Immediately Outside City of
Moorpark Municipal Boundaries, on the Application
of North Park Villaae LP.
was held on May 18, 2005, at which time the City Council continued
the closed public hearing to the City Council meeting to be held on
June 1, 2005, at 7:00 p.m., in the Community Center located at 799
Moorpark Avenue, Moorpark, California.
Dated: May 19, 2005.
Maureen Benson, Deputy City Clerk
STATE OF CALIFORNIA )
COUNTY OF VENTURA ) ss
CITY OF MOORPARK )
AFFIDAVIT OF POSTING
I, Maureen Benson, declare as follows:
That I am the Deputy City Clerk of the City of Moorpark and that a
Notice of Continuance of Closed Public Hearing regarding:
Consider General Plan Amendment No. 2001 -05,
Specific Plan No. 2001 -01, and Zone Change No
2001 -02 for 1,650 Housing Units on 3,586.3 Acres
Located Generally North of Moorpark College and
State Route 118 on Land Immediately Outside City of
Moorpark Municipal Boundaries, on the Application
of North Park Villaae LP.
continued from May 18, 2005, to June 1, 2005, was posted on May 19,
2005, at a conspicuous location near the place of the meeting:
Moorpark Community Center
799 Moorpark Avenue
Moorpark, California
I declare under penalty of perjury that the foregoing is true and
correct.
Executed on May 19, 2005.
Maureen Benson
Deputy City Clerk
ITEM S • b•
CITY OF MOORPARK, CALIFORNIA
City Council Meeting
of
ACTION:
2
MOORPARK CITY COUNCIL WY:
AGENDA REPORTu
A 6 -1- Os,
TO: Honorable City Council L,'-h-'
FROM: Barry K. Hogan, Community Development Director 8WIA
Prepared By: David A. Bobardt, Planning Managerpp? JJ
DATE: May 11, 2005 (CC Meeting of 5/18/2005)
SUBJECT: Consider General Plan Amendment No. 2001 -05, Specific
Plan No. 2001 -01, and Zone Change No. 2001 -02 for
1,650 Housing Units on 3,586.3 Acres Located Generally
North of Moorpark College and State Route 118 on Land
Immediately Outside City of Moorpark Municipal
Boundaries, Applicant: North Park Village, LP
BACKGROUND
On May 10, 2005, after hearing
questions of staff, and deliberating
Report, the City Council continued
18, 2005 regular meeting agenda.
DISCUSSION
Topics for Deliberation
the staff report, asking
on the Environmental Impact
this agenda item to the May
Following is a revised order of topics for deliberation as
chosen by Council on May 10th. Copies of the draft Findings
(with draft Mitigation Monitoring and Reporting Program and
draft Statement of Overriding Considerations) are attached to
assist in the deliberations (Attachment 1). These documents
have been updated from the documents previously presented to
Council to reflect a change to the paleontological mitigation
and a correction to the Findings for wind speed when grading
activities would cease (15 miles per hour) to be consistent with
the Mitigation Monitoring and Reporting Program.
Honorable City Council
May 18, 2005
Page 2
• Environmental Impact Report
➢ Unavoidable Significant Effects
■ Loss of Farmland of Local Importance and Grazing
Land
■ Scenic Views
■ Urbanization of "Natural" Land
■ Increased Night Lighting
■ Traffic Impacts at Spring /High Intersection
■ Traffic Impacts on SR -118 and SR -23 Freeways
■ Loss of Raptor Habitat
➢ Project Benefits Proposed in Statement of Overriding
Considerations
■ Nature Preserve and Open Space System
■ Housing
■ Local Transportation Improvements
■ Parks and Recreation Facilities
■ Fire Station
■ School Mitigation
■ New Observatory Site
➢ EIR Areas of Controversy
• Wildlife Corridors and Other Biological Resource
Concerns
■ Oil Wells
■ Valley Fever
■ Construction Impacts
■ Traffic Impacts
➢ Alternatives
➢ Mitigation Monitoring and Reporting Program
■ Mitigation Wording
■ Responsibility for Overseeing Mitigation
■ Timing of Mitigation Measures
■ Monitoring Action
• Project Plan
➢ Overall Project Layout and Design Approach
➢ Grading and Hillside Management Ordinance
U�i
Honorable City Council
May 18, 2005
Page 3
➢ Architecture
➢ Landscaping
➢ Phasing
➢ Public and Private Improvements /Infrastructure
➢ Residential Planning Areas (Market -Rate and Affordable
Housing)
■ Overall Project Density
■ Gating of Residential Areas
■ Range of Lot Sizes
■ Affordable Housing Sites (PA -9 and PA -49)
➢ Neighborhood Commercial Center
➢ School Site
➢ Fire Station Site
)0-Parks (Public and Private)
■ Location
■ Size
➢ Lake
■ Size and Shape
■ Permitted Uses
■ Maintenance
■ Swimming Lagoon
➢ Open Space and Nature Preserve
■ Layout
■ Restrictions on Uses
➢ Trails
■ Lakefront Trail
■ Nature Preserve Trails
➢ Circulation System
■ SR -118 Interchange
■ Public and Private Streets
■ Bikeways
• General Plan Amendment
➢ Land Use and Circulation Element Text
➢ Ballot Issues (Changes that Moorpark Voters would
Decide)
0.10/ 0Ct "?l 9
Honorable City Council
May 18, 2005
Page 4
• Specific Plan Document
➢ Organization of Document
➢ Development Regulations
➢ Design Guidelines
• Pre - Zoning
Revisions to Specific Plan No. 2001 -01
The Planning Commission, Ad -Hoc Committee (Mayor Hunter, Mayor
Pro Tem Harper) and staff requested a number of changes to the
Specific Plan as originally proposed. In response, the
applicant has made revisions to the North Park Village and
Nature Preserve Specific Plan project, reflected on the revised
site plan (Attachment 2) . It should be noted that all of the
Planning Commission, Ad -Hoc Committee, and staff recommended
changes have been incorporated into the Specific Plan with two
exceptions. First, the Planning Commission recommended that the
neighborhood center (Planning Area 49) be limited to 45,000
square feet of commercial space. The plan shows a center with
up to 70,000 square feet of commercial space, consistent with
the recommendation of the Ad -Hoc Committee and staff to provide
greater flexibility for future commercial uses. This greater
size, when combined with 90 senior apartments, implies that the
commercial center would increase from 5.0 acres to between 6.0
and 6.5 acres to accommodate both retail and residential uses.
The applicant has indicated this can be accomplished by shifting
residences in Planning Area 31, without reducing the size of any
parks or open space. Second, the Planning Commission
recommended that any mention of night lighting for the Community
Park be deferred to consideration at a future time and not be
addressed in the plan. The plan clarifies that night lighting
of the park is permissible, consistent with the recommendation
of the Ad -Hoc Committee and staff. Following are the changes to
the Specific Plan made in response to direction from the
Planning Commission, the Ad Hoc Committee and staff. It is the
intent of staff to attach this list of changes to the Specific
Plan to the Council Resolution along with the Specific Plan
document. If adopted by Council, a clean revised document
incorporating these changes will be prepared for distribution
and public availability within approximately one week.
1. The size of the school site has been increased from 12
acres to 18 net usable acres.
U001011-�
Honorable City Council
May 18, 2005
Page 5
2. The size of the day care site has been reduced from 1.6
acres to 0.6 acres to allow for an increased school size.
3. One water tank has been relocated to avoid impacts to the
vernal pool watershed.
4. The alignment of the new freeway interchange access road
through Waste Management property has been modified to
avoid encroachment of grading into the vernal pool
watershed.
5. A second wildlife crossing has been added to the new
freeway interchange access road.
6. A canyon crossing for Phase A has been relocated to
preserve additional trees based on a re- evaluation of the
number of living oak trees in the impact area.
7. The middle and western entry cottages have been moved
further into the community; the park in PA -11 has been in
front of the entry cottage, and the western entry cottage
has been moved west to be less visible from public areas.
8. Planning Areas 37 and 38 have been consolidated into one
planning area to create a 9.3 -acre publicly accessible
lakeside park with a public swim area, restroom and
changing facilities, and a public boat rental operation.
9. The Lakeside Neighborhood Center (Planning Area 50) has
been moved to the west of the Lakeside Park (Planning Areas
37 and 38 as noted above).
10. Public parking for the Nature Park (Planning Area 11) has
been included as a permitted use.
11. The public trail system has been extended to completely
loop around the lake as presented to the Planning
Commission by the applicant on March 2, 2004, as Option B,
with the lakeside alternative on the north side of the
lake, using paseos where the trail is not immediately
adjacent to the lake. In addition, this lakeside trail now
connects to the Planning Area 44 trail head.
12. Mixed uses (residential and commercial) have been proposed
in Planning Area 49 (Neighborhood Center) to include 90
units of affordable housing.
13. Planning Area 9 has been reduced from 150 to 90 units of
affordable housing.
0v0O...
Honorable City Council
May 18, 2005
Page 6
14. Exhibits or references to Planning Area 10 as a Youth
Sports Park have been eliminated, with reference only to a
Community Park site with 26 net usable acres. Night
lighting is clarified as permissible at this park site.
15. Recreational improvements to be included in the public
parks (Planning Areas 10, 11, and 37 are identified in the
Specific Plan consistent with the Development Agreement.
16. The Implementation Section of the Specific Plan now
includes the establishment of a non - wasting endowment or
landscape management district for the ongoing management
costs of the Nature Preserve. The Land Use, Grading, and
Circulation section now identifies Interpretive Facilities
to be provided as part of the Nature Preserve.
17. The 33 residential lots in the East Las Posas Groundwater
Basin outcrop area have been relocated to Planning Area 31.
18. The four -lane access road from the new freeway interchange
is now shown as a four -lane arterial with a 14 -foot wide
median. This road now connects directly to the northerly
Moorpark College parking lot.
19. A ranch -style home has been included as an architectural
style in the Design Guidelines.
20. Transit stop locations have been added as part of the
improvements to the community park and neighborhood
commercial areas.
21. Construction traffic would access the site through the
Waste Management property until the interchange and access
road are available.
22. A roadway connection at the western property line is
provided.
23. The two easternmost canyon crossings are now proposed as
bridge structures.
24. A multi -use trail to Oak Park from the terminus of the
freeway access road will be provided if agreed to by the
County of Ventura (property owner).
25. The institutional designation for the water tank sites,
helispot, and observatory adjacent to and within the nature
preserve will be removed and these uses will be listed as
conditionally - permitted uses within this land use
designation.
0 0 l, 111 2
Honorable City Council
May 18, 2005
Page 7
26. The street name "Moorpark College Road" will be removed
from the plan to be redesignated as "A" Street until a name
is chosen through the standard City practice.
In addition, the following corrections have been made to the
Specific Plan:
27. Text regarding the Hillside Management Ordinance open space
dedication requirements is modified to reflect compliance
for sloped areas 20% to 35% and 35% to 50% and non-
compliance for slope areas in excess of 50% steepness.
28. Conveyance of the Nature Preserve to public ownership has
been modified for consistency with the draft Development
Agreement.
STAFF RECO14MENDATION
1. Discuss the project and direct staff as deemed appropriate.
2. Continue the agenda item with the closed public hearing to
the regular City Council meeting of June 1, 2005.
Attachments:
1. Draft EIR Findings (with Mitigation Monitoring and
Reporting Program and Statement of Overriding
Considerations)
2. Revised Specific Plan Land Use Map
0 0G,0 3
Volume IX
Findings of Fact
Statement of Overriding Considerations
Mitigation Monitoring and Reporting Program
North Park Village and Nature Preserve
Specific Plan No. 2001 -01
SCH No. 2002011114
City of Moorpark
Community Development Department
799 Moorpark Avenue
Moorpark, California 93021
Prepared for the City by:
BonTerra Consulting
151 Kalmus Drive, Suite E -200
Costa Mesa, California 92626
Affil 12 May 12, 2005
CC ATTACHMENT 1
u��s�.� i
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
VOLUME IX
TABLE OF CONTENTS
Section
FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR SIGNIFICANT
ENVIRONMENTAL EFFECTS
Page
1.0 CERTIFICATION OF THE FINAL PROGRAM ENVIRONMENTAL IMPACT
REPORT........................................................................................... ..............................1
2.0 THE NORTH PARK VILLAGE AND NATURE PREERVE SPECIFIC PLAN
NO. 2001 -01 PROJECT .................................................................... ..............................4
3.0 RECORD OF PROCEEDINGS ......................................................... ..............................7
4.0 FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR MITIGATED
SIGNIFICANTIMPACTS ................................................................... ..............................8
5.0 FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR IMPACTS THAT
CANNOT BE MITIGATED TO A LEVEL CONSIDERED LESS THAN SIGNIFICANT ...91
6.0 FINDINGS REGARDING ORIGINALLY PROPOSED PROJECT AND OTHER
ALTERNATIVES.............................................. ............................... ............................103
ATTACHMENT A
STATEMENT OF OVERRIDING CONSIDERATIONS
1.0 INTRODUCTION ............................................................................... ..............................1
2.0 SIGNIFICANT UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS .....................2
3.0 OVERRIDING CONSIDERATIONS ................................................... ..............................2
4.0 CONCLUSION .................................................................................. ..............................4
ATTACHMENT B
MITIGATION MONITORING AND REPORTING PROGRAM
1.0 INTRODUCTION ............................................................................... ..............................1
2.0 MITIGATION MONITORING AND REPORTING PROGRAM ............ ..............................2
ATTACHMENT C
JUNE _, 2005 STAFF REPORT
To be provided
ATTACHMENT D
RESOLUTIONS FOR CERTIFICATION OF FINAL PROGRAM EIR, ADOPTION OF FINDINGS
OF FACT, AND STATEMENT OF OVERRIDING CONSIDERATIONS
To be provided
SACommunity Development \DEV PMTS \S P \11 -North Park\Environmenta1\050512 Draft Findings TOC.DOC , e Tabl(
�/
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
DRAFT
FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR SIGNIFICANT
ENVIRONMENTAL EFFECTS OF THE NORTH PARK VILLAGE
AND NATURE PRESERVE SPECIFIC PLAN NO. 2001 -01 PROJECT
1.0 CERTIFICATION OF THE FINAL PROGRAM ENVIRONMENTAL IMPACT REPORT
A. OVERVIEW
The California Environmental Quality Act (CEQA)l, Public Resources Code Section 21081,
provides that:
"No public agency shall approve or carry out a project for which an environmental impact
report has been certified which identifies one or more significant effects on the
environment that would occur if the project is approved or carried out unless both of the
following occur:
(a) The public agency makes one or more of the following findings with
respect to each significant effect:
(1) Changes or alterations have been required in, or incorporated
into, the project, which mitigate or avoid the significant effects on
the environment.
(2) Those changes or alterations are within the responsibility and
jurisdiction of another public agency and have been, or can and
should be, adopted by that other agency.
(3) Specific economic, legal, social, technological, or other
considerations, including considerations for the provision of
employment opportunities for highly trained workers, make
infeasible the mitigation - measures or alternatives identified in the
environmental impact report."
(b) With respect to significant effects which were subject to a finding under
paragraph (3) of subdivision (a), the public agency finds that specific
overriding economic, legal, social, technological, or other benefits of the
project outweigh the significant effects on the environment."
The City of Moorpark (City) has prepared a Program Environmental Impact Report (EIR) for
the North Park Village and Nature Preserve Specific Plan No. 2001 -01 State Clearinghouse
Number 200201114 and all related project approvals (Project) in accordance with CEQA,
the CEQA Guidelines and the City's environmental procedures. Because the North Park
Village and Nature Preserve Specific Plan No. 2001 -01 Final Program EIR identified
significant effects that may occur as a result of the Project, the City hereby adopts these
Findings, Statement of Overriding Considerations (Attachment A), and a Mitigation
Monitoring and Reporting Program (Attachment B) as part of the approval of the North Park
Village and Nature Preserve Specific Plan No. 2001 -01 Project and related applications in
accordance with the provisions of CEQA, the CEQA Guidelines, and the City's
1 The California Environmental Quality Act is codified at Public Resources Code Sections 21000 et seq.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc
C 1 i' ' "
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
environmental procedures. The Findings set forth herein are the findings of the City Council
adopted in accordance with the provisions of CEQA and the CEQA Guidelines in support of
this City Council's decision to approve Alternative A.
B. ENVIRONMENTAL REVIEW PROCESS AND CONTENT OF THE PROGRAM
ENVIRONMENTAL IMPACT REPORT
Due to potential environmental impacts associated with implementation of the identified
Proposed Project, and because the proposed action constituted a "project" under CEQA and the
State CEQA Guidelines (Calif. Code of Regulations Sections 15000 et seq.), the City prepared
the Draft Program EIR for the Proposed Project. The Draft Program EIR identified certain
potentially significant effects that could occur as a result of the implementation of the Proposed
Project and, in response thereto, identified project design features, standard conditions and
requirements, and mitigation measures that would reduce or otherwise eliminate said significant
impacts. Consistent with CEQA and the CEQA Guidelines, the Draft Program EIR also
identified and analyzed a series of alternatives to the Proposed Project.
As required by the CEQA Guidelines, the Draft Program EIR was circulated for public review
and comment beginning on July 10, 2003. Although the CEQA Guidelines require a circulation
and comment period of only 45 days for draft environmental impact reports submitted to the
State Clearinghouse for review, the City released the Draft Program EIR for a 75 -day public
review period which ended on September 24, 2003. The City received approximately 135
comments concerning the Draft Program EIR during the public review period as well as
comments provided during the public hearings. Consistent with the mandates of CEQA
Guidelines Section 15088, the City provided appropriate responses to each comment timely
received.
A Recirculated Draft Program EIR was prepared to summarize the results and findings of a
freeway traffic impact analysis prepared by Austin -Foust Associates, Inc., dated November
2003. The analysis was requested by the California Department of Transportation (Caltrans) in
their comment letter on the Draft Program EIR. Caltrans requested that the potential effects of
the project on State Route 118 (SR -118) and State Route 23 (SR -23) be assessed.
Recirculation was required because the freeway traffic impact analysis determined that Phase A
and full buildout of the proposed Specific Plan project would have a significant impact on SR-
118 mainline segments and one mainline segment of SR -23, the latter without planned freeway
improvements. Implementation of mitigation measures to address cumulative and project
impacts is beyond the ability of any individual development project to execute and, therefore,
the project's impacts on the freeway segments would be considered significant and
unavoidable.
The Recirculated Draft Program EIR was released for public review and comment by the City on
December 15, 2003. The 45 -day public review period ended on January 30, 2004. The City
received approximately eight comments concerning the Draft Program EIR during the public
review period as well as comments provided during the public hearings. Consistent with the
mandates of CEQA Guidelines Section 15088, the City provided appropriate responses to each
comment timely received.
On August 19, 2003, the City Planning Commission (Planning Commission) held its first public
hearing to receive and consider public testimony concerning the Proposed Project and the Draft
Program EIR. Fourteen additional public hearings were held before the Planning Commission
to receive additional information and testimony concerning the Proposed Project and the
technical and scientific bases underlying certain elements of the Draft Program EIR.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Findings.doc
0 is 10 �-y
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
In response to (i) comments received during the public review period, (ii) testimony received
during the Planning Commission hearings and (iii) questions posited by members of the
Planning Commission, the City proceeded to conduct further analysis and review relative to the
Proposed Project and the identified alternatives thereto. At the conclusion of this supplemental
analysis period, an alternative to the project, Alternative A, was identified.
Alternative A was recommended to the Planning Commission as the Preferred Project. The
Planning Commission reviewed all documentation comprising the proposed Final Program EIR
and found that the proposed Final Program EIR (i) considered all environmental effects of
Alternative A and (ii) is complete, adequate and fully complies with all requirements of CEQA
and the CEQA Guidelines. The Planning Commission, in conformity with the recommendation
of City staff, issued an advisement that the City Council find the proposed Final Program EIR
adequate and complete and certify it as a Final Program EIR in compliance with CEQA
Guidelines Section 15091.
C. CERTIFICATION FINDINGS
The Final Program EIR is comprised of the Draft Program EIR, Recirculated Draft Program EIR,
a list of persons, organizations and public agencies commenting on the Draft Program EIR and
Recirculated Draft Program EIR, comments received from the public and interested agencies,
the Final Responses to Comments prepared by the City, and all appendices and attachments to
the Program EIR and all documents incorporated by reference therein. The City Council hereby
determines that the Final Program EIR is complete and adequate and has been prepared in
accordance with CEQA and the CEQA Guidelines. The City Council further finds and
determines that the Final Program EIR provides adequate, good faith, and reasoned responses
to all comments raising significant environmental issues. The City Council further finds and
determines that the Final Program EIR is adequate and complete for purposes of adoption of
the approvals of the Project accompanying these Findings and for making the Findings set forth
below.
The Final Program EIR identifies significant or potentially significant environmental impacts that
may occur as a result of implementation of Alternative A (Project), even with the incorporation of
specific measures and programs intended to mitigate said impacts. Thus, in accordance with
the provisions of CEQA, the City hereby adopts this Statement of Findings as part of its action
to certify the Final Program EIR and approve the Project. CEQA Guidelines Section 15093
requires the decision - making agency to balance, as applicable, the economic, legal, social,
technological or other benefits of a proposed project against its unavoidable environmental risks
when determining whether to approve a project. Where the decision of the public agency allows
the occurrence of significant effects which are identified in the Final Program EIR but are not
avoided or substantially lessened, the agency shall state, in writing, the specific reasons to
support its action based on the Final Program EIR and /or other information in the record. Such
a statement is called the "Statement of Overriding Considerations." In connection with its review
and approval of the Preferred Project, the County has prepared the required Statement of
Overriding Considerations; the Statement of Overriding Considerations is attached to these
Findings as Attachment A and incorporated herein by this reference.
A Mitigation Monitoring and Reporting Program has been prepared to monitor and report on the
implementation of the project design features, standard conditions and requirements, and
mitigation measures identified for the Project. The Mitigation Monitoring and Reporting Program
was developed in accordance with the requirements of CEQA Section 21081.6; a copy of the
Mitigation Monitoring and Reporting Program is attached hereto as Attachment B and
incorporated herein by this reference.
SACommunity Development \DEV PMTS \S P \11 -North Park \Enwonmentalk050512 Draft Findings.doc
0
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Consistent with the provisions of CEQA Guidelines Section 15090(a), the City Council has
adopted a resolution certifying the adequacy of the Final Program EIR for the actions described
in these Findings, adopting these Findings and adopting the Statement of Overriding
Considerations. See Resolution 05 -_. In taking these actions, the City Council specifically
finds as follows:
1. The Final Program EIR (as defined, above) has been completed in compliance with
CEQA.
2. The Final Program EIR was presented to the City Council and the Council reviewed and
considered the information in the North Park Village and Nature Preserve Specific Plan
No. 2001 -01 Final Program EIR prior to certifying the Final Program EIR, adopting these
Findings with the Mitigation Monitoring and Reporting Program, adopting the Statement
of Overriding Considerations, and approving the calling of an election for the Project.
Hearings and deliberations were held by the Planning Commission on August 19, 2003,
September 16, 2003, October 7, 2003, October 21, 2003, November 4, 2003, November
18, 2003, December 2, 2003, December 16, 2003, January 6, 2004, January 20, 2004,
February 3, 2004, February 17, 2004, March 2, 2004, March 16, 2004, and April 6, 2004.
Hearings and deliberations were held by the City Council on May 19, 2004, June 16,
2004, July 21, 2004, September 15, 2004, October 20, 2004, November 17, 2004,
January 19, 2005, March 16, 2005, and April 20, 2005, May 4, 2005, May 10, 2005, May
18, 2005, and June 1, 2005.
3. The Final Program EIR reflects the City of Moorpark's independent judgment and
analysis.
In making the foregoing determinations and its decision to approve the Project (see City Council
Resolutions Nos. 2005 - through 2005- and Ordinance Nos. _ and _), the City
Council recognizes that that a range of technical and scientific opinion exists with respect to
many of the environmental issues discussed in the Final Program EIR. The City Council has
acquired an understanding of the range of this technical and scientific opinion by its review of
the Draft Program EIR, Recirculated Draft Program EIR, the comments received on the Draft
Program EIR and Recirculated Draft Program EIR, and the responses to those comments set
forth in the Final Program EIR, as well as testimony, letters, and reports submitted during the
course of the review process. The City Council has reviewed and considered, as a whole, the
evidence and analysis presented in the Final Program EIR, including the Draft Program EIR,
Recirculated Draft Program EIR, the comments on the Draft Program EIR and Recirculated
Draft Program EIR, and the Responses to Comments in the Final Program EIR, as well as the
information presented in the reports prepared by various experts, including the EIR consultants,
the other experts who assisted in the preparation of the Program EIR, and by City staff, and the
other evidence presented during the review process. The City Council has gained a
comprehensive and well- rounded understanding of the environmental issues presented by the
Project. In turn, this understanding has enabled the City Council to make its decisions after
weighing and considering the various viewpoints and evidence bearing on these important
issues.
2.0 THE NORTH PARK VILLAGE AND NATURE PRESERVE SPECIFIC PLAN
NO. 2001 -01 PROJECT
The North Park Village and Nature Preserve Specific Plan No. 2001 -01 Project (referred herein
as "the Project" or "Alternative A ") would imp4ement the North Park Village and Nature Preserve
SACommunity Development \DEV PMTS\S P \11 -North Park\Environmental \050512 Draft Findings.doc
010C IN,-
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Project as originally proposed ( "originally proposed project ") by the project applicant, but would
incorporate the following Project refinements:
• Increasing the school site (Planning Area 21) from 12 acres to 18 net usable acres;
• Reducing the size of the day care site (Planning Area 22) from 1.6 acres to 0.56 acres to
allow for an increased school size;
• Relocating one water tank to avoid impacts to the vernal pool watershed;
• Modifying the alignment of
to be FetuMed thFough the use of walls to Kohibit 6RGFeaGhMeR the new freeway
interchange access road through Waste Management property to avoid encroachment of
grading into the vernal pool watershed;
• Adding a second wildlife crossing under MoeFpaFk College Read. the new freeway
interchange access road;
• Relocating a canyon crossing and bridging the roadways over the easterly canyon to
preserve additional trees and allow for an additional wildlife corridor.
• Relocating the middle and western entry cottages further into the community;
• Consolidating Planning Area 37 and Planning Area 38 into one planning area to create a
9.53 -acre publicly accessible lakeside park with a public swim area, rest-room, and
changing facilities, and a public boat rental operation;
• Shifting the Lakeside Neighborhood Center (Planning Area 49) to the west;
• Clarifying that public parking at the Nature Park (Planning Area 11) is a permitted use;
• Extending the public trail system around the lake to completely loop around the lake,
using paseos where the trail is not immediately adjacent to the lake;
• Providing for mixed uses (residential and commercial) in Planning Area 49 to shift 90
units of the required affordable housing from Planning Area 9 and increasing the total
number of affordable housing units from 150 units to 180 units. Therefore, 90 senior
affordable housing units will be provided in Planning Area 49, and 90 affordable housing
units will be provided in Planning Area 9;
• Changing any exhibits or references for Planning Area 10 as a Youth Sports Park to
Community Park, adding night lighting as a permissible use;
• Removing development of 33 residential lots from the outcrop area of the East Las
Posas Groundwater Basin and relocating the residential lots into Planning Area 31;
Developing the four -lane access road from the new freeway interchange with a 14 -foot
wide median;
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 5
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
• Reconfiguring the new four -lane arterial (primary access) into the Specific Plan site from
a T- intersection configuration to a loop configuration. The four -lane arterial road leads
directly from the new Meerpark SeNege freeway (interchange to the Moorpark College
entrance, providing relief to the Collins /Campus Park intersection by providing direct
vehicular access into Moorpark College for students and faculty traveling from the east.
• Adding a ranch -style home as an architectural style;
• Developing the existing canyon road through the Waste Management site for use during
construction activities and for permanent emergency access; and
• Adding transit stop locations at the community park and neighborhood commercial
areas..."
• Adding a roadway connection at the westerly property line: and
• Adding a multi -use trail to Oak Park from the terminus of the freeway access road if
agreed to by the County of Ventura.
The remaining land use components of the Project remain the same. Under Alternative A, the
project site would be developed with 1,680 residential dwelling units, inclusive of 180 affordable
housing units. Related and supporting uses include a 5 -acre mixed residential /neighborhood
commercial center, an 18 -acre school site, a 29.1 -acre public Community Park, 3 public parks, 9
private parks, a 52 -acre publicly accessible lake, a 1.5 -acre fire station site, a 0.5 -acre day
care /other quasi public facility site, and a 2,123 -acre Nature Preserve. Ancillary land uses
would include, but are not limited to, water reservoirs, detention basins, and a fire service
helispot.
Alternative A would be developed in two primary phases: Phase A and Buildout. The Phase A
portion of the Project would allow for the construction of up to 500 single - family residential
dwelling units and two public parks. As a part of Phase A, grading would occur for the 90 unit
multi - family affordable housing site (Planning Area 9), the school site (Planning Area 21), the
fire station site (Planning Area 23), and day care site (Planning Area 22). Open space lots
would be set aside as the adjacent land use parcels are developed and one -third of the Nature
Preserve would be conveyed to the City as a part of Phase A. Associated infrastructure
improvements would be provided as a part of the Phase A Project. Access to /from the Specific
Plan site under Phase A would be via Collins Drive.
Buildout (Phases B and C) of the remainder of the Specific Plan site would only be permitted
with the completion of an access road and interchange from SR -118. The North Park Specific
Plan Project proposes that a " " new freeway interchange would
be constructed to serve the buildout of the Project. The new
interchange would be located east of Collins Drive. A four -lane arterial roadway would connect
the Moorpark College Interchange to the Specific Plan site and provide direct access into
Moorpark College.
Alternative A would result in similar or reduced environmental impacts when compared to the
originally proposed project. This alternative would not eliminate all of the significant,
unavoidable impacts that are associated with the originally proposed project as follows: the loss
of agricultural land designated as Farmland of Local Importance; short-term and long -term
changes to the site's visual character; increased traffic impacts to local roadways and freeway
capacities; and loss of foraging and nesting habitat for special status raptor species. Alternative
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental\050512 Draft Findings.doc
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
A would reduce impacts to biological resources by providing additional wildlife movement
crossings, avoiding impacts to the identified vernal pool watershed, and reducing the number of
mature trees to be lost through the relocation of a canyon crossing and bridging canyon
crossings. Relocation of 33 residential lots into Planning Area 31 would eliminate potential
impacts to the outcrop area of the East Las Posas Basin.
Relocation of the middle and western entry cottages further into the community increases public
accessibility to the Project's trail system.
Alternative A meets the City's and applicant's objectives as set forth in the Final Program EIR.
3.0 RECORD OF PROCEEDINGS
The North Park Village record of proceedings is specified below. The custodian of the North
Park Village record is the Community Development Director, City of Moorpark, 799 Moorpark
Avenue, Moorpark, California 93021, Contact Person, Barry K. Hogan (805) 517 -6258 or
bhogan(a-)-ci.moorpark.ca.us, and the City's EIR consultant, BonTerra Consulting, 151 Kalmus
Drive, Suite E -200, Costa Mesa, California 92626, contact person, Dana C. Privitt, AICP, (714)
444 -9199. The North Park Village record shall include, but is not limited to, the following:
(a) The Final Program EIR for North Park Village and Nature Preserve, Specific Plan
No. 2001 -01 (SCH No. 2002011114), and all related project approvals, including
all draft volumes, comments and responses, appendices and all documents
cited, incorporated by reference or relied on in that EIR ( "Final Program EIR ");
(b) The North Park Specific Plan No. 2001 -01, and all other project approval
documents, including volumes, appendices, and all documents cited,
incorporated by reference or relied on in the Plan or project approval documents;
(c) All reports, Project application materials, memoranda, technical studies, maps,
letters, and other planning or Project documents, including all attachments,
related documents, and all documents cited, incorporated by reference or relied
on in those materials, prepared by the EIR consultant, the project applicant, and
Planning staff relating to the North Park Specific Plan No. 2001 -01, all related
project approvals, and the Final Program EIR;
(d) All staff reports, attachments, and related documents, prepared by the City
relating to the North Park Specific Plan No. 2001 -01, all related project
approvals, and the Final Program EIR;
(e) Any minutes and transcripts of all public meetings and public hearings held by
the City's Planning Commission and City Council relating to the North Park
Specific Plan No. 2001 -01, all related project approvals, and the Final Program
EIR. Hearings were held by the Planning Commission on August 19, 2003,
September 16, 2003, October 7, 2003, October 21, 2003, November 4, 2003,
November 18, 2003, December 2, 2003, December 16, 2003, January 6, 2004,
January 20, 2004, February 3, 2004, February 17, 2004, March 2, 2004, March
16, 2004, and April 6, 2004. Hearings were held by the City Council on May 19,
2004, June 16, 2004, July 21, 2004, September 15, 2004, October 20, 2004,
November 17, 2004, January 19, 2005, March 16, 2005, April 20, 2005, May 4,
2005, May 10, 2005.a May 18, 2005 and June 1, 2005.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
(f) All notices issued by the City to comply with CEQA, the state CEQA Guidelines,
or any other law governing the processing and approval of the Project or the
Final Program EIR;
(g) Matters of common knowledge to the City, which include, but are not limited to,
the City's General Plan and all applicable municipal code provisions;
(h) The documentation of the decisions made by the City Planning Commission and
City Council, relating to the North Park Specific Plan No. 2001 -01, all related
project approvals, and the Final Program EIR;
(i) Any other written materials relevant to the City's compliance with CEQA, and its
decision on the merits of the Specific Plan and all related project approvals,
including documents that have been released for public review, and copies of
reports, studies or other documents relied on in all environmental documentation
prepared for the Specific Plan and either made available to the public during the
public review period, or included in the City's files on the Specific Plan.
Having considered the foregoing information, the City Council hereby makes findings pursuant
to CEQA, Section 21081 of the Public Resources Code, and the CEQA Guidelines, Sections
15091 and 15092.
4.0 FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR MITIGATED SIGNIFICANT
IMPACTS
The following Findings pertain to each of the impact analyses appearing in Sections 40 and 5.0.
A. DETERMINATION OF SIGNIFICANCE THRESHOLDS
The City Council finds that the determination of significance thresholds is a judgment decision
within the discretion of the City; the significance thresholds used in the Final Program EIR are
supported by substantial evidence in the record, including the expert opinion of the Final
Program EIR preparers and City staff; and the significance thresholds used in the Final Program
EIR provide reasonable and appropriate means of assessing the significance of the adverse
environmental effects of the Project.
B. INCORPORATION OF FINAL PROGRAM EIR
These Findings provide a summary description of each impact, describe the applicable
Mitigation Program (project design features, standard conditions and requirements, and /or
mitigation measures) identified in the Final Program EIR and adopted by the City Council, and
state the City Council's findings on the significance of each impact after imposition of the
adopted Mitigation Program. A full explanation of these environmental findings and conclusions
can be found in the Final Program EIR and these Findings hereby incorporate by reference the
discussion and analysis in the Final Program EIR supporting the Final Program EIR's
determinations regarding the Project's impacts and Mitigation Program designed to address
those impacts. In making these Findings, the City ratifies, adopts, and incorporates the analysis
and explanation in the Final Program EIR in these Findings, and ratifies, adopts, and
incorporates in these Findings the determinations and conclusions of the Final Program EIR
relating to environmental impacts and mitigation measures, except to the extent any such
determinations and conclusions are specifically and expressly modified by these Findings.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental\050512 Draft Findings.doc $ )
00y01,s��aJ
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
C. ADOPTION OF MITIGATION PROGRAM
The City Council adopts the Mitigation Measures identified in these Findings (as
comprehensively set forth in the Mitigation Monitoring and Reporting Program (MMRP) attached
hereto as Attachment B) to reduce or avoid the potentially significant and significant impacts of
the Project, as well as certain less than significant impacts. In adopting said Mitigation
Program, the City Council intends to adopt each of the project design features, standard
conditions and requirements, and mitigation measures proposed in the Final Program EIR.
Accordingly, in the event a component of the Mitigation Program recommended in the Final
Program EIR has inadvertently been omitted from these Findings or Attachment B, such
Mitigation Program component is hereby adopted and incorporated in the Findings below by
reference. In addition, in the event the language describing the Mitigation Program set forth
these Findings or in Attachment B fails to accurately reflect the mitigation in the Final Program
EIR due to a clerical error, the language of the Mitigation Program as set forth in the Final
Program EIR shall control, unless the language has been specifically and expressly modified by
these Findings.
In evaluating the potential environmental impacts associated with the Project, the Final Program
EIR analyzed the following areas of potential environmental impact: land use and related
planning programs; aesthetics and visual resources; transportation and circulation; air quality;
noise; biological resources; geology and soils; hydrology and water quality; cultural and
paleontological resources; public services and utilities; and public health and safety.
Section 4.0 of the Findings identifies those impacts that may occur with implementation of the
Project, but which impacts were found to be below the relevant threshold(s) of significance.
CEQA does not require findings for impacts found to be less than significant and for which
mitigation is, accordingly, not required. Nevertheless, the following information is provided in
order to summarize the bases for determinations of non - significance for various potential
impacts, as presented in the Draft Program EIR.
Although impacts determined to be insignificant do not themselves require mitigation, in some
cases those Mitigation Programs that have been required to address other impacts found to be
potentially significant and in need of mitigation will also further reduce the non - significant
impacts. In these cases, the mitigation is is noted, although the impacts would be insignificant
even without such measures.
MITIGATED SIGNIFICANT IMPACTS
The potentially significant impacts identified in the Final Program EIR, but which can be
mitigated to a less than significant level through implementation of project design features,
standard conditions and requirements, and /or mitigation measures are set forth in this section.
This section also sets forth the City's findings with respect to each of the significant impacts, the
facts in support of those findings, and those changes and alterations that have been made to
the Project to reduce or eliminate potentially significant effects to less than significant levels.
The potential significant adverse impacts that would be mitigated are listed in the following
subsections. The Moorpark City Council finds that these potential adverse impacts would be
mitigated to a level that is considered less than significant after implementation of the project
design features, standard conditions and requirements, and recommended mitigation measures.
Some of the mitigation measures listed in this Statement of Findings of Fact were not in the
July 9, 2003 Draft Program EIR. These measures were added to the Project after the release of
the Draft Program EIR. These additional mitigation measures and modified measures are a
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 9
� ter► 1
ll
�iJ iJ t/ # w d
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
result of one of the following: (1) the applicant proposed an alternative or additional method to
mitigate an impact; (2) the City requested additional mitigation of an impact; or (3) additional or
modified measures were added in response to public comments. The additional mitigation
measures have been included in the Final Program EIR. Consistent and in compliance with
California Environmental Quality Act (CEQA) Guidelines §15088.5, these additional measures
have been analyzed and are not expected to create any additional significant impacts, but will
lessen impacts anticipated to occur with implementation of Alternative A. As such recirculation
associated with the additional mitigation measures was not required.
LAND USE AND RELATED PLANNING PROGRAMS
Less Than Significant Impact: Affordable Housing
Although no significant impacts have been identified, the project applicant will be required to
comply with standard conditions and requirements.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of the standard condition and requirement identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.1: Land Use and Related Planning Programs
Consistent with the City of Moorpark General Plan Housing Element, the tentative map
shall be subject to execution of an Affordable Housing Agreement between the City of
Moorpark and the applicant or developer. The Affordable Housing Agreement shall set
forth the procedure for meeting an affordable housing requirement of 10 percent of the
total number of approved dwelling units. The Agreement may be part of a Development
Agreement. Execution of the Affordable Housing Agreement is required prior to first final
map approval.
Less Than Significant Impact: Parks
Although no significant impacts have been identified, the project applicant will be required to
comply with standard conditions and requirements.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 10
I ;_1 ()!—%/1 T'"
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of the standard condition and requirement identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.1: Land Use and Related Planning Programs
• Prior to approval of the first residential unit building permit, the subdivider shall pay fees,
dedicate land, and /or make improvements in accordance with Section 8297 -4 of the
City's Subdivision Ordinance (Parks and Recreation Facilities).
Potentially Significant Impact Unless Mitigated: Agricultural Use /Operations and
Residential Use Compatibility
During phased development, the potential interface between agricultural uses /operations and
residential uses would be a significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.1: Land Use and Related Planning Programs
The project applicant shall prepare a home buyer notification package that contains a
description and accompanying maps showing the adopted land use plans for the North
Park Specific Plan and surrounding areas, including the existence of grazing and
agricultural activities and mineral rights (oil extraction) on and /or adjacent to the Specific
Plan site. Each homeowner shall be required to affirm, by signature, that he /she is
aware of the existing and future development plans onsite and in the surrounding area,
and that he /she acknowledges the right of property owners to continue grazing and
agricultural activities and mineral extraction operations to the extent allowed under
applicable permits. The contents of the notification package shall be reviewed and
approved by the Community Development Director prior to the recordation of the first
tract map.
The project applicant shall provide a 200 - foot -wide minimum width setback from any
residential structure adjacent to any onsite or offsite agricultural or grazing operations to
reduce the effects of impacts including spraying of pesticides over the adjacent
agricultural operation, noise, dust, etc. This required setback shall be incorporated into
the Specific Plan and shall be applicable until such time that onsite or offsite agricultural
or grazing uses either cease or are converted or developed as a non - agricultural use.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 11
V
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Potentially Significant Impact Unless Mitigated: Existing Oil Wells
All oil wells located within the boundaries of the development area, including cut and fill areas,
would be capped. Two existing oil wells would be located less than 500 feet from residential
land uses: Well #5 would be within 400 feet of Planning Area 9 and Well #19 would be within
300 feet of Planning Area 3. Potential land use incompatibilities exist due to the proximity of the
existing oil well facilities to proposed development. The primary issue is the safety of persons
from trespassing and interfering with the operation of the oil wells and, as a result, becoming
injured.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and adoption of the following mitigation measure as
identified in the Final Program EIR.
Project Desiqn Features
Final Program EIR Section 3.2: Aesthetics and Visual Resources
• No new oil exploration or drilling would be permitted in development areas on the
Specific Plan site. Existing wells in development areas will be capped.
Mitigation Measure
Final Program EIR Section 3.1: Land Use and Related Planning Programs
2. All oil and gas wells, the injector well, and the tank farm facility within the boundaries of
the Specific Plan site (not terminated pursuant to State regulations) shall be enclosed by
a six - foot -high masonry wall with secured gates to prohibit access to the extraction
facilities by any persons other than authorized personnel, visually screen the facilities
from adjacent uses, and mitigate noise. This requirement applies to facilities that would
remain in operation after implementation of the Specific Plan Project. The proposed
walls, including elevations, building materials, landscape materials, and means of
access to the facilities shall be submitted to the Community Development Director for
review and approval prior to the issuance of a grading permit for any sensitive land use
within 800 feet of these uses.
Potentially Significant Impact Unless Mitigated: Moorpark College Parking
Implementation of the North Park Project would preclude construction of a portion of planned
parking for Moorpark College.
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmentaN050512 Draft Findings.doc 12
i
0001 '.J"
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.1: Land Use and Related Planning Programs
3. Prior to the recordation of the first final map, the project applicant shall provide the City
of Moorpark Community Development Director with a written agreement between
Ventura Community College District, the City of Moorpark, and the project applicant that
an alternative future parking site acceptable to Moorpark College and the City of
Moorpark has been identified to provide parking that would be precluded by
implementation of the North Park Specific Plan project, as well as additional students
generated by the project.
Potentially Significant Impact Unless Mitigated: SR -118 Interchange and Access Road
Land Acguistion
Implementation of the SR -118 interchange and access road would require either an easement
over land owned by Waste Management or the acquisition of the property owned by Waste
Management.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of the following mitigation measure as identified in the Final Program EIR. It should be
noted that without the acquisition of needed right -of -way for the SR -118 interchange and access
road, only Phase A of the Project could be graded or constructed.
Mitigation Measure
Final Program EIR Section 3.1: Land Use and Related Planning Programs
4. Implementation of the SR -118 interchange and access road would require either an
easement over land owned by Waste Management or the acquisition of the property
owned by Waste Management. Should the project applicant be unable to directly
purchase from Waste Management the right -of -way necessary to construct access road
from the proposed Moorpark College SR -118 interchange to the North Park Specific
Plan site, the City of Moorpark may acquire, at the developer's expense, including all
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 13
oI•V'v v hr S
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
City costs, all needed right -of -way at fair market value in compliance with California
Code of Civil Procedures § §1230.010 regarding eminent domain. Nothing in this
condition compels the City to complete the eminent domain process if in the sole and
unfettered judgment of the City, condemnation of the access right -of -way is not in the
public's interest. A decision by the City not to complete the eminent domain process
shall not relieve the applicant from the requirement to construct the interchange and
connecting road and does not constitute a waiver of the offsite condition pursuant to
California Code of Civil Procedures § §1230.010.
TRANSPORTATION AND CIRCULATION
Potentially Significant Impact Unless Mitigated: Project Roadway Improvements
To serve the Specific Plan site, primary access to the site would be required from a new
roadway that would extend northeast from Collins Drive at Campus Road. Additional roadway
improvements (identified in Table 3.3 -4 of the Final Program EIR) would be constructed to
provide site circulation.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features as identified in the final Program EIR.
Project Design Features
Final Program EIR Section 3.3: Transportation and Circulation
Phase A
■ E Street will be constructed as a two -lane collector road east from Collins Drive /Campus
Road to provide access to the Specific Plan site.
Buildout
■ Moorpark College Road will be constructed north from SR -118 to the Specific Plan site
as a four -lane arterial. This roadway will not be constructed without the prior approval of
a new SR -118 interchange.
The Moorpark College Interchange will be constructed and connect Moorpark College
Road to the Specific Plan site.
Potentially Significant Impact Unless Mitigated: Construction Traffic
During construction activities associated with the Project, construction worker traffic would
significantly impact the intersection of Collins Drive at Campus Park Drive during the p.m. peak
hour.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 14
0 0G 0 029
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
Mitigation Measures
Final Program EIR Section 3.3: Transportation and Circulation
1. The proposed Specific Plan has identified improvements at the intersection of Campus
Park Drive and Collins Drive to alleviate congestion under short-range conditions due to
background traffic as well as project traffic. To mitigate the impacts of construction
traffic on the intersection of Campus Park Drive at Collins Drive, the planned
improvement shall be completed prior to the construction of the Specific Plan.
2. Prior to the issuance of the first grading permit, a traffic management and construction
materials delivery plan shall be prepared by the applicant and approved by the City
Engineer and Community Development Director to monitor construction traffic and
ensure that there are no additional impacts at the intersections along Collins Drive or
anywhere else. The traffic management and construction materials delivery plan shall
identify construction - related access to the Specific Plan site from an access easement
over Waste Management property at the eastern end of Campus Park Drive, and details
about the number of workers and their scheduling based on the phasing of the
construction. The traffic management and construction materials delivery plan shall
include details about the number of workers and their scheduling based on the phasing
of the construction. The traffic management plan can include incentives offered to
workers who carpool or vanpool, or satellite offsite parking lots can be established and
workers shuttled to the construction site to reduce the amount of construction traffic and
its impacts along Collins Drive. The traffic management plan is required to mitigate any
and all construction traffic impacts.
Potentially Significant Impact Unless Mitigated: Increased Traffic Volumes
The Specific Plan (Phase A With Buildout) will generate 22,734 average daily trips (ADT) with
1,395 a.m. and 2,364 p.m. peak hour trips. Phase A will generate 8,264 ADT with 653 a.m. and
1,087 p.m. peak hour trips. Buildout will generate 14,734 ADT with 876 a.m. and 1,277 p.m.
peak hour trips.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 15
00002-00
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of standard conditions and requirements as identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.3: Transportation and Circulation
For all residential, commercial, and industrial entitlement permits, the applicant shall
provide, where feasible and appropriate:
A. Transit stop improvements, including but not limited to bus pullouts, bus pads or
shelters, as required by the decision - making body or other agency;
B. Safe and convenient access for pedestrians and bicyclists from the external
circulation system to onsite buildings or internal street/sidewalks (source: Moorpark
Municipal Code §17.48.010).
• As a condition of the issuance of a building permit for each residential unit, the developer
shall pay the City of Moorpark a traffic mitigation fee ( "Citywide Traffic Fee "). The
Citywide Traffic Fee may be expended by City in its sole and unfettered discretion.
• Prior to issuance of a building permit, the developer shall pay to the City of Moorpark the
Area of Contribution (AOC) Fees for Los Angeles Avenue AOC. The developer shall
also contribute to any cumulative traffic fee program adopted by the City prior to
issuance of the first residential building permit for the project. AOC fees shall be those
that are in effect at the time of building permit issuance. In addition to the AOC fees, the
developer shall be required to make similar pro -rata contributions to any other traffic
mitigation related pre- construction impact fees approved by the City Council to offset the
long term effects on the City's street system. If the residential portion of the project is
constructed prior to any such additional mitigation fee programs being adopted, for
impacts to intersections outside of the Los Angeles Avenue AOC, a proportionate share
of future improvement costs shall be collected for locations where project traffic has a
measurable effect on cumulative traffic volumes. The City Traffic Engineer and
Community Development Director shall determine the required contributions prior to
issuance of building permits. Fees shall be paid prior to the issuance of these permits.
• The applicant of the North Park Specific Plan project shall pay County of Ventura Traffic
Impact Mitigation Fees to fund roadway and highway improvements on County facilities
resulting in significant impacts to roadways in unincorporated Ventura County. The
Specific Plan site is located within County Land Use District 4.
Potentially Significant Impact Unless Mitigated: Phase A Intersection Impacts
Phase A will generate 8,264 ADT with 653 a.m. and 1,087 p.m. peak hour trips. Two
intersections would be significantly impacted: Collins Drive at the SR -118 westbound ramps and
Collins Drive at the SR -118 eastbound ramps /Los Angeles Avenue.
Signalization would be warranted at the proposed intersections (Collins Drive /Campus Road at
E Street and Moorpark College Road at the SR -118 westbound ramps) under Existing
Conditions, Short-Range Plus Phase A, and Long Range Plus Buildout scenarios with the
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 16
> 43-094-
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
exception of the Collins Drive /Campus Road at E Street intersection under the Short -Term Plus
Phase A Project scenario once the Moorpark College Road /SR -118 interchange is completed.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
2. Final Program EIR Section 3.3: Transportation and CirculationThe project
applicant shall fund its pro -rata share of the costs of improvements to the City of
Moorpark intersections indicated in Table 3.3 -26 of the Final Program EIR.
SACommunity Development\DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 17
00-'�C f,I ,
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
TABLE 3.3 -26
SHORT -RANGE (2007) WITH PHASE A
TRANSPORTATION MITIGATION PROGRAM
Potentially Significant Impact Unless Mitigated: Project Buildout Intersection Impacts
Buildout will generate 14,734 ADT with 876 a.m. and 1,277 p.m. peak hour trips. The following
intersections would be significantly impacted: Collins Drive at the SR -118 eastbound ramps /Los
Angeles Avenue; Tierra Rejada Road at Los Angeles Avenue; Moorpark Avenue at Los Angeles
Avenue; SR -23 southbound ramps at Tierra Rejada Road; and Spring Road at North Hills
Parkway.
Signalization would be warranted at the proposed intersections (Collins Drive /Campus Road at
E Street and Moorpark College Road at SR -118 westbound ramps) under Existing Conditions,
Short -Range Plus Phase A, and Long Range Plus Buildout scenarios with the exception of the
Collins Drive /Campus Road at E Street intersection under the Short-Term Plus Phase A Project
scenario once the Moorpark College Road /SR -118 interchange is completed.
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmenta1\050512 Draft Findings.doc 18
U0- (; X33
Fair Share
Improvement Location
Improvement
Requirement
Roadway Improvements
Los Angeles Avenue
Widen to six lanes from Spring Road to Moorpark Avenue
2%
Intersection Improvements
4. Collins Dr. at Campus Park
Convert NBR to free NBR, convert 2nd EBT to EBR, add 2nd
9%
Drive
WBL, and modify signal to provide EBR overlap with NBL
7. Collins Dr. at SR -118
Convert WBR to free WBR
4%
westbound ramps
8. Collins Dr. at SR -118
Signalize
4%
eastbound ramps /Los
Angeles Avenue
10. Tierra Rejada Rd. at Los
Add 2nd SBT and modify signal to provide NBR overlap with
1 %
Angeles Avenue
WBL
12. Spring at Los Angeles Ave.
Add 2nd SBL and 3rd WBT, convert 2nd EBL to 3rd EBT and
2%
convert NBR to shared 2nd NBT /NBR
13. Science Dr. /Miller Pkwy.
Add 2nd WBL, convert 2nd NBL to shared NBL/NBT, convert
3%
at New Los Angeles Ave.
NBT to 2nd NBR, convert SBT to shared SBL/SBT, and
modify signal to provide N/S split phasing and to provide NBR
overlap with WBL
21. Miller Pkwy. /Moorpark
Modify signal to provide SBR overlap with EBL and EBR
2%
Road at Tierra Rejada Rd.
overlap with NBL
23. SR -23 southbound ramps at
Convert SBL to shared SBL/SBR
2%
Tierra Rejada Rd.
NBL: northbound left -turn lane
NBT: northbound through lane
NBR: northbound right -turn lane
Note: These abbreviations also apply to southbound, eastbound, and westbound movements
Source: North Park Village Specific Plan Traffic Analysis, Austin -Foust Associates, Inc., May 2003.
Potentially Significant Impact Unless Mitigated: Project Buildout Intersection Impacts
Buildout will generate 14,734 ADT with 876 a.m. and 1,277 p.m. peak hour trips. The following
intersections would be significantly impacted: Collins Drive at the SR -118 eastbound ramps /Los
Angeles Avenue; Tierra Rejada Road at Los Angeles Avenue; Moorpark Avenue at Los Angeles
Avenue; SR -23 southbound ramps at Tierra Rejada Road; and Spring Road at North Hills
Parkway.
Signalization would be warranted at the proposed intersections (Collins Drive /Campus Road at
E Street and Moorpark College Road at SR -118 westbound ramps) under Existing Conditions,
Short -Range Plus Phase A, and Long Range Plus Buildout scenarios with the exception of the
Collins Drive /Campus Road at E Street intersection under the Short-Term Plus Phase A Project
scenario once the Moorpark College Road /SR -118 interchange is completed.
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmenta1\050512 Draft Findings.doc 18
U0- (; X33
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
3. Final Program EIR Section 3.3: Transportation and CirculationThe project
applicant shall fund its pro -rata share of the costs of improvements to the City of
Moorpark intersections indicated in Table 3.3 -27 of the Final Program EIR.
TABLE 3.3 -27
LONG -RANGE (2020) WITH SPECIFIC PLAN BUILDOUT
TRANSPORTATION MITIGATION PROGRAM
SACommunity Development\DEV PMTS \S P \11 -North ParkTriwonmenta1\050512 Draft Findings.doc 19
: ��% -I 00(
Fair Share
Improvement Location
Improvement
Requirement
Roadway Improvements
Los Angeles Avenue
Widen to six lanes from Moorpark Avenue to Gabbert Road/
1 -2%
Tierra Rejada Road, and widen to four lanes from Gabbert
Road/Tierra Rejada Road to west of the City limits
North Hills Parkway
Construct as four -lane arterial from the eastern boundary of
4 -5%
the Hitch Ranch Specific Plan site to Spring Road, and as a
six -lane arterial from Spring Road to SR -118
Spring Road
Widen to four lanes from Peach Hill Rd to Tierra Rejada Road
<1%
Intersection Improvements
8. Collins Dr. at SR -118
Convert WBT to shared WBT/WBR
4%
eastbound ramps /Los
Angeles Avenue
10. Tierra Rejada Rd. at Los
Add 2nd NBT
<1%
Angeles Avenue
11. Moorpark Ave. at Los
Convert WBR to shared 3rd WBT/WBR and modify signal to
2%
Angeles Avenue
eliminate WBR overlap with SBL
23. SR -23 southbound ramps at
Add 3rd WBT
2%
Tierra Rejada Rd.
31. Spring Rd. at North Hills
New intersection: signalize and provide NBL, dual NBT, NBR,
4%
Parkway
dual SBL, dual SBT, EBL, 3 EBT, WBL, 3 WBT, WBR, NBR
overlap with WBL and WBR overlap with SBL
NBL: northbound left-turn lane
NBT: northbound through lane
NBR: northbound right -turn lane
Note: These abbreviations also apply to southbound, eastbound, and westbound movements
Source: North Park Village Specific Plan Traffic Analysis, Austin -Foust Associates, Inc., May 2003.
SACommunity Development\DEV PMTS \S P \11 -North ParkTriwonmenta1\050512 Draft Findings.doc 19
: ��% -I 00(
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
AIR QUALITY
Potentially Significant Impact Unless Mitigated: Fugitive Dust Emissions
The Ventura County Air Pollution Control District (VCAPCD) does not require the quantification
of fugitive dust emissions (PM10 emissions). The VCAPCD recommends minimizing fugitive
dust, especially during grading and excavation operations. Grading for Phase A and Buildout
would result in large quantities of fugitive dust emissions every day during the grading periods.
Therefore, the potential for the Specific Plan Project to cause substantial increases in PM10
emissions that could interfere with attainment of particulate standards is high; this is a significant
impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following standard conditions and requirements as identified in the Final
Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.4: Air Quality
• All construction contractors shall comply with Ventura County Air Pollution Control
District (VCAPCD) regulations, including Rule 51 (nuisance). The applicant shall comply
with the following directives for controlling fugitive dust emissions from grading and
excavation:
a. During clearing, grading, earth moving or excavation operations regular watering
shall control dust. In addition the following measures shall apply:
1. The area disturbed by clearing, grading, earthmoving, or excavation operations
shall be minimized to prevent excessive dust generation.
2. All trucks shall be required to cover their loads as required by California Vehicle
Code §23114.
3. All graded and excavated material, exposed soil areas, and active portions of the
construction site, including unpaved on -site roadways, shall be treated to prevent
fugitive dust. Treatment shall include, but not be limited to, periodic watering,
application of environmentally -safe soil stabilization materials, and /or roll -
compaction as appropriate. Watering shall be done as often as necessary and
reclaimed water shall be used whenever possible.
4. Signs shall be posted onsite limiting traffic to 15 miles per hour or less
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 20
0 0 �i %_*
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
5. Adjacent streets and roads shall be swept at least once per day, preferably at the
end of the day, if visible soil material is carried over to adjacent streets and
roads.
6. Water all site access roads and material excavated or graded onsite or offsite to
prevent excessive amounts of dust. Watering shall occur a minimum of /at least
two times daily, preferably in the late morning and after the completion of work
for the day. Additional watering for dust control shall occur as directed by the
City. Application of water (preferably reclaimed, if available) should penetrate
sufficiently to minimize fugitive dust during grading activities. The grading plan
shall indicate the number of water trucks that will be available for dust control at
each phase of grading.
7. Cease all clearing, grading, earthmoving, or excavation operations during periods
of high winds (greater than 2-5 15 mph averaged over one hour). The contractor
shall maintain contact with the Ventura County Air Pollution Control District
(VCAPCD) meteorologist for current information about average wind speeds.
Water or securely cover all material transported offsite and onsite to prevent
excessive amounts of dust.
8. Keep all grading and construction equipment on or near the site until these
activities are completed.
9. All employees involved in grading or excavation operations during dry periods
shall use facemasks to reduce inhalation of dust.
10.Wash off heavy -duty construction vehicles before they leave the site. During
clearing, grading, earthmoving or excavation operations regular watering shall
control dust. Water all site access roads and material excavated or graded
onsite or offsite to prevent excessive amounts of dust. Watering shall occur a
minimum of two times daily, preferably in the late morning and after the
completion of work for the day. Additional watering for dust control shall occur
as directed by the City. The grading plan shall indicate the number of water
trucks that will be available for dust control at each phase of grading.
b. After clearing, grading, earth moving, or excavation operations, and during
construction activities, fugitive dust emissions should be controlled using the
following procedures:
1. Apply non - hazardous chemical stabilizers to all inactive portions of the
construction site. When appropriate, seed exposed surfaces with a fast growing,
soil binding plant to reduce wind erosion and its contribution to local particulate
levels.
2. Periodically, or as directed by the City Engineer, sweep public streets in the
vicinity of the site to remove silt (i.e., fine earth material transported from the site
by wind, vehicular activities, water runoff, etc.), which may have accumulated
from construction activities.
3. During smog season (May through October), the City shall order that
construction cease during Stage II alerts to minimize the number of vehicles and
equipment operating, lower ozone levels and protect equipment operators from
SACommunity Development \DEV PMTS \S P \11 -North Park\Environmental \050512 Draft Findings.doc 21
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
excessive smog levels. The City, at its discretion, may also limit construction
during Stage I alerts.
4. Graded and /or excavated inactive areas of the construction site shall be
monitored by the City Engineer at least weekly for dust stabilization. Soil
stabilization methods, such as water and roll- compaction, and environmentally -
safe dust control materials, shall be periodically applied to portions of the
construction site that are inactive for over four days. Upon completion of grading
and excavation operations within an area, the area shall be seeded and watered
until ground cover grass growth is evident, or periodically treated with
environmentally -safe dust suppressants, to prevent excessive fugitive dust.
c. The following fugitive dust control measures recommended by the VCAPCD shall be
evaluated by the City and by the applicant and shall be implemented if they are
found feasible and have not already been incorporated in the preceding mitigation
measures:
1. Dust control requirements shall be shown on all grading plans.
2. All trucks shall be required to cover their loads as required by California Vehicle
Code §23114.
3. Signs shall be posted onsite limiting vehicle speed to 15 miles per hour or less.
4. All site access roads shall be paved at least 100 feet from the main road.
5. There shall be at least one qualified and authorized person onsite each work day
to enforce the provisions of the Fugitive Dust Mitigation Plan and any other
applicable fugitive rules, ordinances, or conditions.
6. Personnel involved in grading operations should be advised to wear respiratory
protection in accordance with California Division of Occupational Safety and
Health regulations.
7. All project construction operations shall be conducted in compliance with all
applicable Ventura County Air Pollution Control District Rules and Regulations
with emphasis on Rule 50 (Opacity) and Rule 51 (Nuisance).
Potentially Significant Impact Unless Mitigated: NO. and ROC Construction Emissions
The primary construction - related source of NOx and ROC emissions is heavy equipment.
Construction emissions of ROC and NOx are not counted toward the adopted significance
thresholds because they are considered by VCAPCD to be temporary. VCAPCD recommends
mitigation if they could exceed the daily threshold of 25 pounds per day. This is particularly
important when project construction extends over several years, as would be the case for the
North Park Specific Plan Project. Phase A and Buildout construction activities would exceed
NOx thresholds. Grading activities for Phase A and Buildout have a high potential to cause
substantial increases in emissions, resulting in a significant impact.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 22
VGIC I ^"0
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of standard conditions and requirements as identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.4: Air Quality
• The applicant shall comply with the following measures, as feasible, to reduce NOX and
ROC from heavy equipment as recommended by the Ventura County Air Pollution
Control District in its Ventura County Air Quality Assessment Guidelines.
a. Minimize equipment idling time. Turn equipment off when not in use for more than
five minutes.
b. Maintain equipment engines in good condition and in proper tune as per
manufacturers' specifications.
c. Lengthen the construction period during smog season (May through October) to
minimize the number of vehicles and equipment operating at the same time.
d. Use alternatively fueled construction equipment, such as compressed natural gas
(CNG), liquefied natural gas (LNG) or electric, if feasible.
• Comply with all applicable provisions of the City of Moorpark's Transportation Demand
Management Ordinance.
Potentially Significant Impact Unless Mitigated: Diesel Exhaust Particulate Matter
The California Air Resources Board has identified diesel exhaust particulate matter as a Toxic
Air Contaminant JAC). Diesel exhaust includes hundreds of different gaseous and particulate
components, many of which are toxic. The VCAPCD Guidelines do not specifically address
diesel exhaust as a TAC. However, the South Coast Air Quality Management District
(SCAQMD) issued Health Risk Assessment Guidance for Analyzing Cancer Risks from Mobile
Source Diesel Emissions in December 2002. The inhalation risk of cancer is 300 in one million
if a person inhales 1µg /m3 of diesel exhaust continuously for 70 years. The SCAQMD's
guidance is directed at large indirect sources, such as truck stops and distribution centers,
where there are large numbers of diesel trucks in one area in continuous operation over many
years and where there may be sensitive receptors in close proximity that are continuously
exposed. The guidance does not address construction emissions because these occur over a
limited period, are intermittent, and, in the case of large developments, may occur in many
locations at different times. These emissions are dispersed in the air, thereby reducing
downwind concentrations. Heavy equipment operators are the most at risk.
SACommunity Development\DEV PMTS\S P \11 -North Park\Environmenta1\050512 Draft Findings.doc 23
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.4: Air Quality
In order to reduce diesel fuel engine emissions, the project applicant shall require
that all construction bid packages include a separate "Diesel Fuel Reduction Plan."
This plan shall identify the actions to be taken to reduce diesel fuel emissions during
construction activities (inclusive of grading and excavation activities). Reductions in
diesel fuel emissions can be achieved by measures including, but not limited to, the
following: a) use of alternative energy sources, such as compressed natural gas or
liquefied petroleum gas, in mobile equipment and vehicles; b) use of "retrofit
technology," including diesel particulate trips, on existing diesel engines and
vehicles; and c) other appropriate measures. Prior to the issuance of a grading
permit, the Diesel Fuel Reduction Plan shall be filed with the City of Moorpark
Community Development Department. The Diesel Fuel Reduction Plan shall include
the following provisions:
a. All diesel fueled off -road construction equipment shall be California Air Resources
Board (CARB) certified or use post- combustion controls that reduce pollutant
emissions to the same level as CARB certified equipment. CARB certified off -road
engines are engines that are three years old or less and comply with lower emission
standards. Post - combustion controls are devices that are installed downstream of
the engine on the tailpipe to treat the exhaust. These devices are now widely used
on construction equipment and are capable of removing over 90 percent of the PM1o,
carbon monoxide, and volatile organic compounds from engine exhaust, depending
on the specific device, sulfur content of the fuel, and specific engine. The most
common and widely used post- combustion control devices are particulate traps
(i.e., soot filters), oxidation catalysts, and combinations thereof.
b. All diesel fueled on -road construction vehicles shall meet the emission standards
applicable to the most current year to the greatest extent possible. To achieve this
standard, new vehicles shall be used or older vehicles shall use post- combustion
controls that reduce pollutant emissions to the greatest extent feasible.
c. The effectiveness of the latest diesel emission controls is highly dependant on the
sulfur content of the fuel. Therefore, diesel fuel used by on -road and off -road
construction equipment shall be low sulfur ( >15 ppm) or other alternative low
polluting diesel fuel formulation such as PuriNOxTM or Amber363. Low sulfur diesel
fuel shall be required by existing regulations after the year 2007 and it is already
being produced and sold as the regulation is phased in.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 24
(�0( y�3
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Potentially Sianificant Impact Unless Mitiaated: Operational Emissions
Ventura County is an attainment area for all state and national carbon monoxide standards.
The VCAPCD's Air Quality Guidelines recommend conducting a screening CO analysis for any
project whose indirect emissions exceed VCAPCD's significance thresholds. This "hot spot"
analysis should be undertaken for any intersection impacted by a project that currently exceeds,
or is expected to exceed, Level of Service (LOS) E or F because of project traffic. The Project
includes roadway improvements that would improve the level of service at all intersections to
LOS C or better in 2007 and 2020. Therefore, the North Park Specific Plan Project is exempt
from a CO analysis using the VCAPCD's criteria because the only intersections currently at
LOS E or LOS F will be at acceptable levels of service upon Project implementation with
mitigation.
The primary source of operational emissions would be vehicle trips. Based on the traffic
analysis (Austin -Foust Associates, Inc., March 2003), there would be 31,404 daily trips
generated by the Project at buildout. There would also be emissions from natural gas,
landscaping, and consumer products. Based on VCAPD significance thresholds, both NOX and
ROC operational emissions would exceed thresholds under Phase A and Buildout conditions.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
Mitigation Measures
Final Program EIR Section 3.4: Air Quality
Traffic mitigation measures incorporated into the Project would reduce local impacts to less than
significant levels.
2. Prior to the issuance of a building permit for the construction for each residential unit
and the commercial center, the developer shall make a contribution to the Moorpark
Traffic Systems Management (TSM) Fund to fund TSM programs or clean -fuel vehicles
programs, as determined by the City of Moorpark using the latest URBEMIS program
for reactive organic compounds or nitrogen oxide emissions in excess of the daily
threshold over a three -year period from Buildout. Fees shall be assessed in
accordance with the Ventura County Air Pollution Control District Assessment
Guidelines.
3. Prior to the issuance of the first building permit, the applicant shall demonstrate to
the City of Moorpark that all North Park Specific Plan structures have been designed
and shall be constructed to be at least 20 percent more energy efficient than required
by the energy efficiency standards of the State Building Code, Title 24, California Code
of Regulations, Part 6— California Energy Efficiency Standards for Residential and
Nonresidential Buildings).
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 25
0 ()C �
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
NOISE
Less Than Significant Impact: Construction - Related Noise Impacts
For short periods, grading equipment operating directly adjacent to the existing residences to
the south would generate significant noise levels at these homes. Because construction noise
generated during daytime hours is permitted (as set forth in Section 15.26.010 of the Municipal
Code), it is not a significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
Although considered a less than significant impact, the following standard conditions and
requirements and mitigation measure are applicable, as identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.5: Noise
Construction activities shall be limited to between 7:00 a.m. and 7:00 p.m. Monday
through Saturday. Construction work on Saturdays will require payment of a premium
for City inspection services, and may be further restricted or prohibited should the City
receive complaints from adjacent property owners. No construction work is to be done
on Sundays, and City observed holidays pursuant to Section 15.26.010 of the Municipal
Code.
Mitigation Measure
Final Program EIR Section 3.5: Noise
The developer shall ensure that construction equipment is fitted with modern sound
reduction equipment as identified in Section 3.5 of the Final Program EIR.
Potentially Significant Impact Unless Mitigated: Vehicular Noise Increases
Within the Specific Plan site, residences along roadways may experience outdoor noise levels
exceeding the City's 65 CNEL standard and indoor levels exceeding the City's 45 CNEL
standard. Other proposed uses may also be exposed to noise levels in excess of the City's
standards, creating a significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North ParMEmAronmenta1\050512 Draft Findings.doc 26
0 " -' "''I
v v ,: .A.
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
Mitigation Measures
Final Program EIR Section 3.5: Noise
2. When final grading plans become available and prior to grading permit issuance, an
acoustical analysis shall be performed to determine the exact height and location of
barriers required to meet the City exterior noise standards. This analysis shall be
prepared by a qualified acoustical engineer and be reviewed and approved by the City
prior to permit issuance. A wall with a maximum height of 6.5 feet would reduce traffic
noise levels to below 65 CNEL for homes along a roadway. Homes may be required to
provide approximately 25 dB of outdoor -to- indoor noise reduction. With typical
residential construction, at least 20 dB of outdoor -to- indoor noise reduction is achieved
with windows closed. Air conditioning of residential units provides adequate ventilation
to assume that windows remain closed. With additional building upgrades, outdoor -to-
indoor noise reductions of up to 32 dB can be achieved. All residences would require
less than 32 dB of outdoor -to- indoor noise reduction.
3. At the time detailed architectural drawings become available and prior to building permit
issuance, an acoustical analysis shall be performed that outlines a program for
implementation of the Noise Standard of 65 CNEL (Community Noise Equivalent Level)
at all locations within the development. The City also requires that interior noise levels
attributable to exterior noise sources not exceed 45 CNEL. The program shall specify
any upgrades to the standard construction required to meet the standard. This analysis
should be prepared by a qualified acoustical engineer and be reviewed and approved by
the City prior to permit issuance.
4. The City of Moorpark Community Development Director shall review all uses to be
located at the Neighborhood Commercial site. If the City determines that any proposed
use will potentially exceed the Noise Ordinance limits, an acoustical analysis shall be
prepared to ensure that the use does not violate the Noise Ordinance. The analysis
shall document the sources of noise generated by the use and show compliance with the
Noise Ordinance and any measures required for compliance. This analysis shall be
prepared by a qualified acoustical engineer and be reviewed and approved by the City of
Moorpark Community Development Director prior to permit issuance.
BIOLOGICAL RESOURCES
Potentially Significant Impact Unless Mitigated: Habitat Changes and Loss of Coastal
Sage Scrub
Construction of Phase A and Buildout would impact approximately 1,139.2 acres of the Specific
Plan site including: coastal sage scrub -342.6 acres (Phase A: 147.5 acres; Buildout: 195.1
acres); chaparral -65.1 acres (Phase A: 45.4 acres; Buildout: 19.7 acres); native
grassland /potential native grassland -34.6 acres (Phase A: 28.1 acres; Buildout: 6.5 acres); non-
native grassland -617.2 acres (Phase A: 233.8 acres; Buildout: 383.4 acres); riparian habitat -
46.3 acres (Phase A: 42.5 acres; Buildout: 3.8 acres) including U.S. Army Corps of Engineers
(USACE) jurisdictional "Waters of the US" -4.75 acres (Phase A: 2.43 acres; Buildout:
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 27
V U ,(ti" A'J ) M i K
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
2.32 acres) and California Department of Fish and Game (CDFG) jurisdictional waters -25.03
acres (Phase A 16.63 acres; Buildout: 8.4 acres); coast live oak woodland -709 oak trees
(Phase A: 534 trees; Buildout: 175 trees); ruderal -27.6 acres (Phase A: 11.7 acres; Buildout:
15.9 acres).
The loss of primarily high quality wildlife habitat and its concomitant loss of wildlife resulting from
both Phase A and Buildout of the project site is considered a significant impact. The loss of key
habitats and species related to implementation of this Project would contribute to a cumulative
significant effect on biological resources.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
With respect to modifications to habitat, the significant effect has been avoided or mitigated to a
level that is less than significant by inclusion of project design features and adoption of the
following mitigation measure as identified in the Final Program EIR.
Project Desiqn Features
Final Program EIR Section 3.6: Biological Resources
• Open Space Nature Preserve. This project design feature would offset the impacts on
coastal sage scrub vegetation and native grassland vegetation. Approximately 2,123
acres of the site will be preserved as a Nature Preserve. Table 3.6 -5 of the Final
Program EIR lists the acres of habitat located within the Nature Preserve.
The Nature Preserve would be dedicated open space. The size of the open space
cannot be changed without an affirmative vote of the electorate of the City of Moorpark.
Uses within the Nature Preserve are proposed to be limited to the following: biological
and cultural research, education, management, revegetation, restoration, and
enhancement, astronomical observatory, all oil and gas activities within easements and
quitclaims granted prior to the enactment of the Specific Plan, and hiking trails and utility
and water transmission lines necessary to connect permitted public or quasi - public
facility uses to adjust development.
TABLE 3.6 -5
ACRES BY VEGETATION TYPE IN THE NATURE PRESERVE
Vegetation Type
Nature
Preserve
Acres
Coastal sage scrub
610.9
Chaparral
911.3
Potential native grassland
63.3
Non - native grassland
419.2
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 28
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Southern coast live oak riparian forest
48.9
Mule fat scrub
0.5
Coast live oak woodland
50.9
Vernal pool
0.4
Potential vernal pool
0.9
Ruderal
14.7
Total
2,121.0
Source: BonTerra Consulting, 2003.
A Conservation Organization shall be chosen by the City of Moorpark (in coordination
with the U.S. Fish and Wildlife Service and the California Department of Fish and Game
if necessitated by any regulatory permitting requirements) to manage the Nature
Preserve. The project applicant shall provide a mechanism (such as a non - wasting
endowment or landscape maintenance district) acceptable to both the City and
Conservation Organization to fund ongoing management costs of the Conservation
Organization.
Culverts with a minimum diameter of five feet shall be provided under the access road
connecting the Specific Plan site to the SR -118 Moorpark College Interchange. In
addition, an underpass shall be constructed under this access road approximately
500 feet south of Hidden Creek Canyon. The east side of the underpass shall connect
with an access road along which shall be placed wildlife fencing. The wildlife fencing
shall be placed along the west side of the access road and guide wildlife to the
underpass. The west side of the underpass shall open up immediately into natural open
space. The bottom of the underpass shall have a natural substrate to facilitate wildlife
movement. The dimensions of the underpass shall meet the minimum requirements
needed for mule deer to pass through. The opening (from one end of the underpass to
the other) shall be 0.9 or greater based on the following mathematical formula: height
times (width divided by length) equals 0.9 or greater. Wildlife guzzlers shall be installed
at the existing crossing of the SR -118 and near all new Project culverts and
underpasses selected for wildlife movement. A guzzler is an underground water trap
that provides a perennial source of water for wildlife. Installation of these wildlife
guzzlers near Project culverts encourages movement to and through these potentially
new wildlife crossings. In addition, these guzzlers and Project culverts, including those
under SR -118 and the underpass of the access road, will be monitored by a qualified
wildlife biologist for three years to document their effectiveness of use by wildlife
species. Monitoring methods shall include use of camera, track plates, or diatomaceous
earth or other acceptable means to determine wildlife use at selected locations. A
minimum of six surveys per each of the four seasons shall be conducted to determine
wildlife movement at the culverts under SR -118 and the culverts and underpass under
the access road to SR -118 shall be conducted throughout the three -year monitoring
program.
Reports shall be prepared and submitted to the City of Moorpark Community
Development Director and to any appropriate agency on an annual basis. Each report
shall include the findings of the wildlife movement surveys and all pertinent details
regarding project design features intended for wildlife use. Based on the findings of
monitoring, recommendation to enhance wildlife movement through SR -118 crossings or
through the new culverts and underpass of the access road that connects the Specific
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 29
000 � � 'I
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Plan site with the interchange at SR -118 shall be provided as appropriate (e.g., fencing
modification, vegetation enhancement, lighting adjustments, etc.).
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
The impact to coastal sage scrub shall be mitigated at an acreage ratio of 2:1. Coastal
sage scrub habitat shall be preserved onsite within the Nature Preserve as described in
the Project Design Features. As a part of the project, 74.3 acres of coastal sage scrub
shall be restored in the Nature Preserve. The revegetation program shall be developed
by a qualified biologist and submitted to the City of Moorpark Community Development
Director for review and approval prior to issuance of the first grading permit. Restoration
shall consist of seeding with appropriate sage scrub species.
A detailed conceptual mitigation plan shall be developed and implemented and contain
the following items:
a. Responsibilities and qualifications of the personnel to implement and supervise the
plan. The responsibilities of the landowner, specialists, and maintenance personnel
that will supervise and implement the plan shall be specified.
b. Site selection. The site(s) for restoration shall be determined in coordination with the
project applicant, the City of Moorpark, and the project biologist. The site shall be
located in the Nature Preserve and be contiguous with other natural open space
areas.
c. Site preparation and planting implementation. The site preparation shall include:
1) protection of existing native species, 2) trash and weed removal, 3) native species
salvage and reuse (i.e., duff), 4) soil treatments (i.e., imprinting, decompacting),
5) erosion control measures (i.e., rice or willow wattles), and 6) seed mix application.
d. Schedule. Site restoration shall be conducted between October and January 30.
Introduction of hydroseed mix and container plants shall take place immediately after
preparation of the restoration sites.
e. Maintenance plan /guidelines. The maintenance plan shall include: 1) weed control,
2) herbivory control, 3) trash removal, 4) irrigation system maintenance,
5) maintenance training, and 6) replacement planting.
Monitoring Plan. The monitoring plan shall include: 1) qualitative monitoring
(i.e., photographs and general observations), 2) quantitative monitoring (i.e.,
randomly placed transects), 3) performance criteria as approved by the resource
agencies, 4) monthly reports for the first year and bimonthly reports thereafter, and
5) annual reports which shall be submitted to the resource agencies for three to five
years. The monitoring shall be conducted for three to five years, depending upon the
performance of the site and as approved by the City's Community Development
Director.
g. Long -term preservation. Long -term preservation of the site shall be outlined in the
conceptual mitigation plan to ensure the mitigation site is not impacted by future
development.
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 30
? i� Al r-
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
h. Performance standards shall be in the conceptual plan and apply to the revegetation
of sage scrub. At a minimum in the conceptual plan, revegetation shall be
considered successful at three to five years if the percent cover and species diversity
of the restored and /or created habitat areas are similar to percent cover and species
diversity of adjacent existing habitats, as determined by quantitative testing of
existing and restored areas. Jf the performance standards are not met in five years,
the applicant shall meet with the City of Moorpark and develop appropriate remedial
measures for habitat loss. The non - native species cover on the revegetation at the
end of the monitoring period shall be less than 10 percent.
In addition, earthmoving equipment shall avoid maneuvering in areas outside the
identified limits of grading in order to avoid disturbing open space areas that will remain
undeveloped. Prior to grading, the natural open space limits shall be marked by the
construction supervisor and the project biologist. These limits shall be identified on the
grading plan. The applicant shall submit a letter to the City of Moorpark verifying that
construction limits have been flagged in the field. No earthmoving equipment shall be
allowed within the open space areas without approval of the project biologist and the
City of Moorpark.
Potentially Significant Impact Unless Mitigated: Wildlife Movement
Phase A and Buildout phase would result in a reduction of open space habitats north of SR -118
that would reduce the connectivity between open spaces on both sides of SR -118. Increased
light and noise pollution and concomitant increase in human activity after completion of the
Project would also further degrade the quality of this wildlife movement under the SR -118,
resulting in a significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features as identified in the Final Program EIR.
Project Desiqn Features
Final Program EIR Section 3.6: Biological Resources
Open Space Nature Preserve. This project design feature would offset the impacts on
coastal sage scrub vegetation and native grassland vegetation. Approximately 2,123
acres of the site will be preserved as a Nature Preserve. Table 3.6 -5 of the Final
Program EIR lists the acres of habitat located within the Nature Preserve. (See
complete wording of the Open Space Nature Preserve project design feature above for
coastal sage scrub.)
A Conservation Organization shall be chosen by the City of Moorpark (in coordination
with the U.S. Fish and Wildlife Service and the California Department of Fish and Game
if necessitated by any regulatory permitting requirements) to manage the Nature
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 31
? 411 -4 F'
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
Preserve. The project applicant shall provide a mechanism (such as a non - wasting
endowment or landscape maintenance district) acceptable to both the City and
Conservation Organization to fund ongoing management costs of the Conservation
Organization.
Culverts with a minimum diameter of five feet shall be provided under the access road
connecting the Specific Plan site to the SR -118 Moorpark College Interchange. In
addition, an underpass shall be constructed under this access road approximately
500 feet south of Hidden Creek Canyon. The east side of the underpass shall connect
with an access road along which shall be placed wildlife fencing. The wildlife fencing
shall be placed along the west side of the access road and guide wildlife to the
underpass. The west side of the underpass shall open up immediately into natural open
space. The bottom of the underpass shall have a natural substrate to facilitate wildlife
movement. The dimensions of the underpass shall meet the minimum requirements
needed for mule deer to pass through. The opening (from one end of the underpass to
the other) shall be 0.9 or greater based on the following mathematical formula: height
times (width divided by length) equals 0.9 or greater. Wildlife guzzlers shall be installed
at the existing crossing of the SR -118 and near all new project culverts and underpasses
selected for wildlife movement. A guzzler is an underground water trap that provides a
perennial source of water for wildlife. Installation of these wildlife guzzlers near project
culverts encourages movement to and through these potentially new wildlife crossings.
In addition, these guzzlers and project culverts, including those under SR -118 and the
underpass of the access road, will be monitored by a qualified wildlife biologist for three
years to document their effectiveness of use by wildlife species. Monitoring methods
shall include use of camera, track plates, or diatomaceous earth or other acceptable
means to determine wildlife use at selected locations. A minimum of six surveys per
each of the four seasons shall be conducted to determine wildlife movement at the
culverts under SR -118 and the culverts and underpass under the access road to SR -118
shall be conducted throughout the three -year monitoring program.
Reports shall be prepared and submitted to the City of Moorpark Community
Development Director and to any appropriate agency on an annual basis. Each report
shall include the findings of the wildlife movement surveys and all pertinent details
regarding project design features intended for wildlife use. Based on the findings of
monitoring, recommendation to enhance wildlife movement through SR -118 crossings or
through the new culverts and underpass of the access road that connects the Specific
Plan site with the interchange at SR -118 shall be provided as appropriate (e.g., fencing
modification, vegetation enhancement, lighting adjustments, etc.).
Potentially Significant Impact Unless Mitigated: Native Grassland /Potential Native
Grassland
Construction of Phase A and Buildout would impact approximately 1, 139.2 acres of the Specific
Plan site including native grassland /potential native grassland -34.6 acres (Phase A: 28.1 acres;
Buildout: 6.5 acres).
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 32
000 00, 04
ky �rr�
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and adoption of the following mitigation measure as
identified in the Final Program EIR.
Project Design Features
Final Program EIR Section 3.6: Biological ResourcesOpen Space Nature
Preserve. This project design feature would offset the impacts on coastal sage scrub
vegetation and native grassland vegetation. Approximately 2,123 acres of the site will
be preserved as a Nature Preserve. Table 3.6 -5 of the Final Program EIR lists the acres
of habitat located within the Nature Preserve. (See complete wording of the Open
Space Nature Preserve project design feature above for coastal sage scrub.)
A Conservation Organization shall be chosen by the City of Moorpark (in coordination
with the U.S. Fish and Wildlife Service and the California Department of Fish and Game
if necessitated by any regulatory permitting requirements) to manage the Nature
Preserve. The project applicant shall provide a mechanism (such as a non - wasting
endowment or landscape maintenance district) acceptable to both the City and
Conservation Organization to fund ongoing management costs of the Conservation
Organization.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
2. Foothill needlegrass grassland shall be restored in the Nature Preserve at an acreage
ratio of 2:1. The project requires 5.6 acres of foothill needlegrass grassland be restored
in the Nature Preserve. A native grass restoration program shall be developed by a
qualified biologist and submitted to the City of Moorpark Community Development
Director for review and approval prior to issuance of the first grading permits.
Restoration shall consist of seeding with appropriate needlegrass species.
The conceptual mitigation plan shall be developed and implemented and shall contain
the following items:
a. Responsibilities and qualifications of the personnel to implement and supervise the
plan. The responsibilities of the landowner, specialists, and maintenance personnel
that will supervise and implement the plan shall be specified.
b. Site selection. The site(s) for restoration shall be determined in coordination with the
project applicant, City of Moorpark, and project biologist. The site shall be located in
the Nature Preserve and be contiguous with other natural open space areas.
c. Site preparation and planting implementation. The site preparation shall include:
1) protection of existing native species, 2) trash and weed removal, 3) native species
salvage and reuse (i.e., duff), 4) soil treatments (i.e., imprinting, decompacting),
5) erosion control measures (i.e., rice or willow wattles), and 6) seed mix application.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Findings.doc 33
000ntpaA
e� '+
'ai J:
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
d. Schedule. Site restoration shall be conducted between October and January 30.
Introduction of hydroseed mix and container plants shall take place immediately after
preparation of the restoration sites.
e. Maintenance plan /guidelines. The maintenance plan shall include: 1) weed control,
2) herbivory control, 3) trash removal, 4) irrigation system maintenance,
5) maintenance training, and 6) replacement planting.
Monitoring Plan. The monitoring plan shall include: 1) qualitative monitoring (i.e.,
photographs and general observations), 2) quantitative monitoring (i.e., randomly
placed transects), 3) performance criteria as approved by the City of Moorpark,
4) monthly reports for the first year and bimonthly reports thereafter, and 5) annual
reports which shall be submitted to the City of Moorpark for three to five years. The
monitoring shall be conducted for three to five years, depending upon the
performance of the site and as approved by the City of Moorpark. If the performance
standards are not met in five years, the applicant shall meet with the City of
Moorpark and develop appropriate remedial measures for habitat loss.
g. Long -term preservation. Long -term preservation of the site shall be outlined in the
conceptual mitigation plan to ensure the mitigation site is not impacted by future
development.
h. Performance standards shall be identified and apply to the restoration of foothill
needlegrass grassland. Revegetation shall be considered successful at three to five
years if the percent cover and species diversity of the restored and /or created habitat
areas are similar to percent cover and species diversity of adjacent existing habitats,
as determined by quantitative testing of existing, restored, and created habitat areas.
Potentially Significant Impact Unless Mitigated: Riparian Habitat
Construction of Phase A and Buildout would impact approximately 1, 139.2 acres of the Specific
Plan site including: riparian habitat -46.3 ac. (Phase A: 42.5 acres; Buildout: 3.8 acres) including
U.S. Army Corps of Engineers (USACE) jurisdictional "Waters of the US" -4.75 acres (Phase A:
2.43 acres; Buildout: 2.32 acres) and California Department of Fish and Game (CDFG)
jurisdictional waters -25.03 acres (Phase A: 16.63 acres; Buildout: 8.4 acres).
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features, standard conditions and requirements, and adoption of the
following mitigation measure as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 34
0 0 u 0 _9
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Project Design Features
Final Program EIR Section 3.6: Biological Resources
• Open Space Nature Preserve. This project design feature would offset the impacts on
coastal sage scrub vegetation and native grassland vegetation. Approximately 2,123
acres of the site will be preserved as a Nature Preserve. Table 3.6 -5 of the Final
Program EIR lists the acres of habitat located within the Nature Preserve. (See
complete wording of the Open Space Nature Preserve project design feature above for
coastal sage scrub.)
• A Conservation Organization shall be chosen by the City of Moorpark (in coordination
with the U.S. Fish and Wildlife Service and the California Department of Fish and Game
if necessitated by any regulatory permitting requirements) to manage the Nature
Preserve. The project applicant shall provide a mechanism (such as a non - wasting
endowment or landscape maintenance district) acceptable to both the City and
Conservation Organization to fund ongoing management costs of the Conservation
Organization.
Standard Conditions and Requirements
Final Program EIR Section 3.6: Biological Resources
The applicant shall be required to obtain all Clean Water Act 401 and 404 permits and
clearances as administered by the U.S. Army Corps of Engineers and the Regional
Water Quality Control Board /State Water Resources Board. These permits shall be
obtained prior to initiating any grading permits or clearing and grubbing activities not
covered under the City's grading ordinance. All conditions of the permits and
certifications from these agencies that are designed to minimize impacts to biological
resources and all measures to mitigate for the loss of jurisdictional habitats shall be
implemented. Implementation of mitigation designed to offset impacts to areas of
federal jurisdiction shall be monitored by the relevant federal agencies and by the City
(under the California Environmental Quality Assurance Program) for the project.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
3. Phase A would impact 2.43 acres of U.S. Army Corps of Engineers ( USACE)
jurisdictional "waters of the U.S." within Specific Plan development area; Buildout would
impact an additional 2.32 acres, thus totaling 4.75 acres (RBF Consulting, 2002). With
respect to California Department of Fish and Game (CDFG) jurisdictional boundaries
within development area, Phase A would impact 16.63 acres and Buildout would impact
an additional 8.40 acres, thus totaling 25.03 acres.
Compensatory mitigation for the loss of wetland or riparian function and values is a
fundamental component of the USACE and the CDFG permitting process. The objective
of the mitigation is to ensure no net loss of habitat values from the project. Mitigation
can consist of: 1) avoidance or minimization of impacts; 2) compensation in the form of
habitat restoration; or 3) compensation through participation in a mitigation bank.
Avoidance and minimization of impacts is preferred. Any compensation through
restoration shall be onsite and in kind. The exact requirements of any special permit
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 35
00 C .���
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
conditions established for the proposed project would be determined by the USACE
and /or the CDFG following review of the formally submitted project application.
The applicant shall develop a detailed program prior to issuance of the first grading
permit to ensure no net loss of habitat values from the site which contains the following
components:
a. Responsibilities and qualifications of the personnel to implement and supervise the
plan. The responsibilities of the landowner, technical specialists, and maintenance
personnel that will supervise and implement the restoration plan shall be specified.
b. Site selection. The site for the mitigation shall be determined in coordination with
the project applicant and resource agencies. The site shall either be located on the
Specific Plan site in the Nature Preserve or dedicated open space area shall be
purchased offsite. Appropriate sites must have suitable hydrology and soils for the
establishment of riparian species.
c. Site preparation and planting implementation. The site preparation shall include:
1) protection of existing native species, 2) trash and weed removal, 3) native
species salvage and reuse (i.e., duff), 4) soil treatments (i.e., imprinting,
decompacting), 5) temporary irrigation installation, 6) erosion control measures
(i.e., rice or willow wattles), 7) seed mix application, and 8) container species.
d. Schedule. A schedule shall be developed which includes planting to occur in late
fall and early winter between October and January 30.
e. Maintenance plan /guidelines. The maintenance plan shall include: 1) weed control,
2) herbivory control, 3) trash removal, 4) irrigation system maintenance,
5) maintenance training, and 6) replacement planting.
Monitoring Plan. The monitoring plan shall include: 1) qualitative monitoring
(i.e., photographs and general observations), 2) quantitative monitoring
(i.e., randomly placed transects), 3) performance criteria as approved by the
resource agencies, 4) monthly reports for the first year and bimonthly thereafter, and
5) annual reports for five years that shall be submitted to the resource agencies on
an annual basis. The site shall be monitored and maintained for five years to
ensure successful establishment of riparian habitat within the restored and created
areas; however, if there is successful coverage prior to five years, the project
applicant may request to be released from monitoring requirements from USACE
and CDFG and as approved by the City of Moorpark.
g. Long -Term Preservation. Long -term preservation of the site shall also be outlined
in the plan to ensure the mitigation site is not impacted by future development. A
conservation easement and a performance bond shall be secured prior to
implementation of the site.
h. Plan Approval. The plan shall be subject to review and approval by the Community
Development Director of the City of Moorpark, in coordination with CDFG.
In addition, earthmoving equipment shall avoid maneuvering in areas outside the
identified limits of grading in order to avoid disturbing open space areas that will
remain undeveloped. Prior to grading, the natural open space limits shall be marked
SACommunity Development \DEV PMTS\S P\11 -North Park \Environmental \050512 Draft Findings.doc 36
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
by the construction supervisor and the project biologist and shall be identified on the
grading plan. The applicant shall submit a letter to the City of Moorpark verifying that
construction limits have been flagged in the field.
Potentially Significant Impact Unless Mitigated: Coast Live Oak Woodland
Construction of Phase A and Buildout would impact approximately 1, 139.2 acres of the Specific
Plan site including coast live oak woodland -709 oak trees (Phase A: 534 trees; Buildout: 175
trees).
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and adoption of the following mitigation measure as
identified in the Final Program EIR.
Project Desiqn Features
Final Program EIR Section 3.6: Biological Resources
Open Space Nature Preserve. This project design feature would offset the impacts on
coastal sage scrub vegetation and native grassland vegetation. Approximately 2,123
acres of the site will be preserved as a Nature Preserve. Table 3.6 -5 of the Final
Program EIR lists the acres of habitat located within the Nature Preserve. (See
complete wording of the Open Space Nature Preserve project design feature above for
coastal sage scrub.)
A Conservation Organization shall be chosen by the City of Moorpark (in coordination
with the U.S. Fish and Wildlife Service and the California Department of Fish and Game
if necessitated by any regulatory permitting requirements) to manage the Nature
Preserve. The project applicant shall provide a mechanism (such as a non - wasting
endowment or landscape maintenance district) acceptable to both the City and
Conservation Organization to fund ongoing management costs of the Conservation
Organization.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
4. A total of 534 trees will be impacted by Phase A and an additional 175 trees by Buildout.
The project shall be designed to avoid trees to the greatest extent practicable. If this
impact cannot be avoided, an inventory of oak trees on the proposed development site
shall be updated by an arborist approved by the City of Moorpark Community
Development Director prior to the removal of oak trees on the Specific Plan site. The
inventory shall record the location and size of individual oak and walnut trees that are
9.5 inches diameter at breast height (dbh) or larger including dead or dying trees on the
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 37
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
proposed development site. The inventory shall also include the dbh, height, canopy
width, aesthetic rating, health rating, number of trunks, and appraisal value of each oak
tree.
Prior to grading, orange snow fencing shall be installed around trees (outside the
dripline) that would not be impacted by construction. Fencing shall be in place and
inspected by the project biologist prior to commencement of grading. This fencing shall
remain in place throughout construction in the vicinity of the fenced trees until the
Community Development Director determines that the fences can be removed without
placing the trees in jeopardy of damage from construction.
As stated in Moorpark Municipal Code 12.12.070 (f), "The Director of Community
Development, or his or her designee, shall cause an appraisal of the value of said trees
to be prepared in accordance with Section 12.12.050C. The resulting value shall be
applied to upgrading the size of tree plantings associated with the project." The
replacement of coast live oak trees shall occur at a minimum 3:1 ratio based on the
appraisal value of the trees as set forth in Municipal Code 12.12.070 (f). Oak trees
relocated into landscape areas of the Specific Plan site shall not count toward meeting
the mitigation obligation of the project.
The Landscape Architect/designer for the project shall design these replacement trees
into the Specific Plan site to replace the habitat of removed woodlands. The habitat
shall be reviewed by a qualified biologist and must be comparable to the removed
woodland.
Planting specification shall consider the following:
a. Newly planted trees shall be planted above grade and maintained for five years,
including irrigation, weed control, herbivore protections, and replacement.
b. Amending the backfill soil with wood shavings, oak leaf -mold, etc. is not
recommended when existing soil is high in natural organic matter with a sandy loam
texture, unless recommended by the project biologist.
c. Recommendations for the need of planting amendments and drainage systems shall
be based on soil tests of this project and approved by the City.
d. Any City approved work within the driplines of saved trees, including branch removal,
shall be under the inspection of a qualified arborist.
e. Landscaping requiring irrigation shall not be planted within the dripline of oaks due to
the susceptibility of native oaks to root rot caused by excessive unseasonable
irrigation. The design and installation of landscape irrigation systems outside the
dripline of the oaks shall be such that the area within the dripline is not wetted during
operation of the system. In addition, surface runoff from impermeable surfaces shall
be directed away from oaks; where natural topography has been altered, provisions
should be made for drainage away from trunks of oaks so that water shall not pond
or collect within the dripline of any oak.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 3$
0 00 �3
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
Potentially Significant Impact Unless Mitigated: Special Status Plant Species
Direct and indirect impacts to special status plant species that are known to occur onsite and
which have the potential to occur onsite would be considered significant.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and adoption of the following mitigation measure as
identified in the Final Program EIR.
Project Design Features
Final Program EIR Section 3.6: Biological Resources
Open Space Nature Preserve. This project design feature would offset the impacts on
coastal sage scrub vegetation and native grassland vegetation. Approximately 2,123
acres of the site will be preserved as a Nature Preserve. Table 3.6 -5 of the Final
Program EIR lists the acres of habitat located within the Nature Preserve. (See
complete wording of the Open Space Nature Preserve project design feature above for
coastal sage scrub.)
A Conservation Organization shall be chosen by the City of Moorpark (in coordination
with the U.S. Fish and Wildlife Service and the California Department of Fish and Game
if necessitated by any regulatory permitting requirements) to manage the Nature
Preserve. The project applicant shall provide a mechanism (such as a non - wasting
endowment or landscape maintenance district) acceptable to both the City and
Conservation Organization to fund ongoing management costs of the Conservation
Organization.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
5. A spring survey shall be conducted and completed prior to the issuance of the first
grading permit. The special status plant species surveys shall follow guidelines
developed by the California Native Plant Society (CNPS) (Tibor, 2001). These surveys,
as outlined in the guidelines, shall be conducted during the appropriate time of year for
each species determined by a qualified botanist. If any special status plant species is
located its rarity and abundance shall be evaluated and the appropriate mitigation shall
be implemented. The following mitigation strategy shall be used in the evaluation.
This special status plant mitigation strategy is based on the following guidelines:
Avoiding the impact to the species to the extent possible through project planning.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 39
; r
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
• Minimizing impacts.
• Rectifying the impact by repairing, rehabilitating, or restoring the impacted
environment.
• Reducing or eliminating the impact over time by preservation and maintenance
operations during the life of the project.
• Compensating for the impact by replacing or providing substitute resources or
environments.
If avoidance is not possible then consultation with the U.S. Fish and Wildlife Service
shall be required for federally - listed species and consultation with California Department
of Fish and Game for state - listed species shall be required. A special status plant
mitigation program shall be developed following focused surveys and submitted to the
appropriate agencies for review.
Potentially Significant Impact Unless Mitigated: Western Spadefoot Toad
If the western spadefoot toad, a state and federal species of concern, is present in Hidden
Creek Canyon, the loss of this habitat would be potentially significant because Project impacts
would result in the loss of habitat in the northernmost portion of this species range.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
6. A focused series of surveys shall be conducted by a permitted biologist for the western
spadefoot toad prior to the issuance of the first grading permit and during the breeding
season for this species (February through May). The survey results shall be submitted
within 45 days after completion of the last survey to the California Department of Fish
and Game (CDFG) for concurrence. If it is determined that the western spadefoot is not
present, no further mitigation is necessary. If the western spadefoot is located, then a
relocation program shall be developed. The relocation program shall include a detailed
methodology for locating, capturing, and relocating individuals prior to construction. The
program shall identify a suitable location for relocation of the western spadefoot prior to
capture. The relocation program requires a biologist with the necessary permits for
handling the western spadefoot. The program and the biologist(s) implementing the
program shall be subject to approval of the CDFG. The relocation program shall be
completed prior to the issuance of the first grading permit.
SACommunity Development \DEV PMTS \S P\11 -North Park\EnvironmentaR050512 Draft Findings.doc 40
0 u.JJ
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Potentially Significant Impact Unless Mitigated: Coastal California Gnatcatchers
The entire onsite habitat for this pair of coastal California gnatcatchers burned on October 25,
2003 during the Simi Valley fires. The fire burnt the majority of the Specific Plan site, with
primary exceptions to habitat directly adjacent to oil wells and petroleum tanks within Hidden
Creek Canyon. The fire also missed small patches of habitat. The area where previous
surveys identified the California gnatcatcher, much of the vegetation was reduced to ash.
Vegetation still recognizable within this area includes patches of prickly pear (Opuntia littoralis)
and at least one coast live oak tree (Quercus agrifolia). Small patches of vegetation, as the
result of 2004 rains, began to sprout in this area. Plant resprouting included blue -eyed grass
(Sisyrichium bellum), needlegrass (Nassella sp.), and mustard (Brassica sp.). The habitat is
expected to recover.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
7. The focused surveys for the coastal California gnatcatcher found one pair in the Buildout
area of the project. As a result, consultation with the U.S. Fish and Wildlife Service shall
occur in order to obtain a take permit prior to any project activities that may result in
impacts on the coastal California gnatcatcher. The permitting can occur through either
Section 7 or 10 of the federal Endangered Species Act depending on the presence or
absence of a federal nexus. The permitting process would require the preparation of a
Biological Assessment, which would include a mitigation plan to avoid or minimize
impacts on this species. This mitigation may include avoiding the habitat of the coastal
California gnatcatcher, construction limited to the non - breeding season, noise
restrictions on construction, or purchase of offsite habitat for this species, in addition to
the preserved coastal sage scrub in the Nature Preserve.
Potentially Significant Impact Unless Mitigated: Burrowing Owl
A burrow of a burrowing owl may be directly impacted by Project implementation, thereby
substantially reducing the population of this species within the region.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development\DEV PMTS \S P \11 -North Park\Environmental \050512 Draft Findings.doc 41
!'+ I-- G
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
8. At least one focused survey shall be conducted for the burrowing owl prior to issuance of
a grading permit and during the breeding season for this species (March through
August). The survey results shall be submitted within 45 days after completion of the
last survey to the California Department of Fish and Game (CDFG) for concurrence. If it
is determined that the burrowing owl is not present, no further mitigation is necessary. If
the burrowing owl is located on the development area, a mitigation program shall be
developed. If an active burrow is present, the active site shall be protected until nesting
activity has ended in compliance with Section 3503.5 of the California Fish and Game
Code. Nesting activity for raptors in the project region normally occurs from February 1
to June 30. To protect active burrows the following restrictions on construction are
required between February 1 and June 30 (unless burrows are no longer active as
determined by a qualified biologist). Any active burrows found during survey efforts shall
be mapped on the construction plans.
a. Clearing limits will be established a minimum of 100 feet in any direction from any
active burrow.
b. Access and surveying will not be allowed within 50 feet of any active burrow.
Construction during the non - nesting season can occur only if a qualified biologist has
determined that the burrows are no longer active. If an active burrow is observed during
the non - nesting season, the burrow shall be monitored by a qualified biologist, and the
biologist will evacuate the burrows in a manner consistent with any applicable state or
federal laws or regulations and using CDFG- approved burrow closure procedures. The
mitigation program shall include measures to assure nesting success if the survey(s)
determines a breeding pair is present. Prior to implementation of the mitigation program,
the program and the biologist implementing the program shall be subject to approval of
the CDFG.
Potentially Significant Impact Unless Mitigated: Water Quality Effects on Aquatic Species
Water quality may be adversely affected by runoff of nutrients from urban development, in turn
affecting populations of aquatic species and those that use riparian areas.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 42
,� ...y
000 � •
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.8: Hydrology and Water Quality
4. Prior to issuance of the initial grading permit, the applicant shall have prepared a Storm
Water Quality Urban Impact Mitigation Plan (SQUIMP) and include Non - Structural,
Source Control, and Structural Best Management Practices (BMPs). A Certified Erosion
and Sediment Control Professional or qualified Civil Engineer shall prepare the
SQUIMP. The SQUIMP shall be reviewed and approved by the Moorpark Community
Development Director and City Engineer. The development of the SQUIMP shall
conform to the Ventura County National Pollutant Discharge Elimination System permit,
the SQUIMP standards, and the Technical Guidance Manual for Storm Water Quality
Control Measures. The following are the minimum required mitigation from the
Technical Guidance Manual for Storm Water Quality Control Measures.
General Site Design
G -1 Conserve Natural Areas. This measure involves locating development on the
least sensitive portion of a site and conserving naturally vegetated areas. This
measure can minimize environmental impacts in general and storm water runoff
impacts in particular. The design of the North Park Specific Plan currently
incorporates some of these planning measures.
G -2 Protect Slopes and Channels. If not properly protected and stabilized, erosion of
slopes and channels can be major sources of sediment and associated
pollutants, such as nutrients. Channel stability and erosion control measures
shall be analyzed and discussed the Master Plan of Drainage (see Mitigation
Measure 1).
G -3 Control Peak Storm Water Runoff Discharge Rates. Unless controlled, peak
storm water runoff rates from developed areas are typically higher than those
from previously undeveloped areas. Higher peak flows can change stream
morphology and increase downstream erosion that can damage stream habitat,
impact aesthetic values, and convey larger pollutant loads to receiving waters.
Therefore, the project must mitigate the post - development discharge rates to less
than the existing storm event peak flow rates.
G -4 Minimize Impervious Area. Suggested strategies for minimizing imperviousness
through site design include: reduce footprints of buildings and parking lots,
cluster buildings and paved areas, use minimum allowable roadway and sidewalk
sections and parking stall widths, include landscape islands in cul -de -sacs, use
pervious pavement materials, provide grassy bioswale area that meet NPDES
requirements within the downstream portions of the lot areas protected and
maintained by Homeowner Associations, and use grass -lined channels or
surface swales to convey runoff instead of paved gutters. Such measures shall
be included in the SQUIMP portion of the Master Plan of Drainage.
G -5 Minimize Effective Imperviousness. This approach involves routing runoff from
impervious areas over grassy areas or other pervious areas prior to discharge to
SACommunity DevelopmenADEV PMTS \S P \11 -North Park\Environmental \050512 Draft Findings.doc 43
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
the storm drainage system or receiving water to reduce peak flows, reduce total
runoff volume and provide some degree of pollutant removal. Three methods for
minimizing effective imperviousness include turf buffers, grassy bioswale areas
that meet NPDES requirements within the downstream portions of the lot areas
that are protected and maintained by a Homeowners Association, and grass -
lined channels. This approach shall be addressed in the SQUIMP portion of the
Drainage Master Plan.
Site - Specific Source Control
The SQUIMP portion of the Drainage Master Plan shall address:
S -1 Storm Drain Message and Signage. The appropriate locations for the signage
regarding discharge prohibitions at storm drain inlets and a standard message to
be used throughout the Specific Plan site.
S -2 Outdoor Material Storage Area Design. General design criteria for outdoor
material storage area design.
S -3 Outdoor Trash Storage and Waste Handling Area Design. General design
criteria for outdoor trash storage and waste handling area design.
S -4 Outdoor Loading /Unloading Dock Area Design. General design criteria for
outdoor loading /unloading dock area design.
S -5 Outdoor Repair /Maintenance Bay Design. General design criteria for outdoor
repair and maintenance bay design.
S -6 Outdoor Vehicle /Equipment/Accessory Washing Area Design. General design
criteria for outdoor vehicle, equipment, and accessory washing area design.
S -7 Fueling Area Design. General design criteria for fueling area design.
S -8 Proof of Control Measure Maintenance. To ensure that maintenance is provided,
the County of Ventura Watershed Protection District may require a Maintenance
Agreement and a Maintenance Plan from the owner /operator of the storm water
control measures. The SQUIMP shall identify the party(ies) responsible for
maintenance of control measures.
Structural/Treatment BMPs
The SQUIMP shall include structural and /or treatment BMPs. The structural BMPs shall
focus on meeting potential TMDL and pollutant standards for residential developments.
The treatment BMPs shall conform to the Technical Guidance Manual for Storm Water
Control Measures. The SQUIMP guidelines contained in the National Pollutant
Discharge Elimination System ( NPDES) Permit and Waste Discharge Requirements for
Ventura County state that Structural BMPs are required for all new developments. The
structural BMPs shall be sized to comply with one of the following numeric sizing criteria,
unless an alternative is considered by the permittees to provide equivalent or better
treatment. Ground water quality must be evaluated based on the amount of water and
the potential pollutants that may be introduced associated with the buildout of the
Specific Plan site.
SACommunity Development\DEV PMTS \S P\11 -North ParMEnvironmenta1\050512 Draft Findings.doc 44
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
Volume -based BMPs shall be designed to infiltrate or treat either:
a. The volume of annual runoff based on unit basin storage water quality volume, to
achieve 80 percent or more volume treatment by the method recommended in the
California Storm Water Best Management Practices Handbook — Industrial/
Commercial (1993), the Ventura Countywide Storm Water Quality Management
Program Land Development Guidelines, or;
b. The 85th percentile 24 -hour runoff event determined as the maximized capture storm
water volume for the area, from the formula recommended in Urban Runoff Quality
Management, WEF Manual of Practice No. 231ASCE Manual of Practice No. 87
(1998), or;
c. The volume of runoff produced for a 0.75 -inch storm event, prior to its discharge to a
storm water conveyance system, or;
d. The volume of runoff produced from a historical- record based reference 24 -hour
rainfall criterion for "treatment" that achieves approximately reduction in pollutant
loads achieved by the 85th percentile 24 -hour runoff event. The volume of runoff
produced from the 85th percentile 24 -hour storm event, as determined from the local
historical rainfall record;
I.Ti
Flow -based BMPs shall be designed to infiltrate or treat either:
a. 10 percent of the 50 -year design flow rate, or;
b. A flow that will result in treatment of the same portion of runoff as treated using
volumetric standards, or;
c. A rain event equal to at least 0.2 inches per hour intensity, or;
d. A rain event equal to at least two times the 85th percentile hourly rainfall intensity for
Ventura County.
The Technical Guidance Manual for Storm Water Quality Control Measures requires that
treatment controls measures be used for any new development. The following is a
partial list of treatment control measures that may be used by the applicant:
T -1
Grass Strip Filter
T -2
Grass Swale Filter
T -3
Extended Detention Basin
T -4
Wet Detention Basin
T -5
Constructed Wetland
T -6
Detention Basin /Sand Filter
T -7
Porous Pavement Detention
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 45
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
T -8 Porous Landscape Detention
T -9 Infiltration Basin
T -10 Infiltration Trench
The following discussion identifies treatment control measures that are appropriate for
use on the North Park Specific Plan site:
T -1 & -2: Grass Strip and Swales. An appropriate treatment is either vegetative swales,
enhanced vegetated swales utilizing check dams and wide depressions, a
series of small detention facilities designed similarly to a dry detention basin, or
a combination of these treatment methods into a treatment train (a series of
Structural BMPs). It is essential that the SQUIMP address treatment for North
Park to assure that the runoff from the site be treated to the "maximum extent
practicable ".
In order for the vegetation swales to be effective in the removal of potential
pollutants, the swales must be treated as water quality features and must be
maintained differently than grass areas. Specifically, pesticides, herbicides,
and fertilizers, which may be used on the grass areas, must not be used in the
vegetation swales.
T -3: Extended Detention Basins (T -3). Construction of extended detention basins
within the proposed retention basin is likely the most efficient way of treating
storm water runoff from North Park. The purpose of the extended detention
basin is to aid in the removal mechanism: settling or sedimentation; adsorption
to sediments, vegetation, or detritus; filtration by plants; microbial uptake and /or
transformation; and uptake by wetland plants or algae. The removal of the
urban runoff pollutants occurs during the slow draining of the basin (minimum
24 hours).
Water Quality Basins are expected to reduce the following pollutants: total
suspended solids, total phosphorous, total nitrogen, chemical oxygen demand
(COD), total lead, total zinc, total copper, and bacteria.
If other treatment controls are used, such as those discussed below, the
treatment volumes for the extended detention basins can be reduced or
eliminated. Several of the following treatment control measures could be used
within the development in parks or single lots.
T -9 & -10 Infiltration Trenches and Basins. Infiltration Trenches and /or Basins may be
used onsite to meet potential future TMDLs for noxious aquatic plants and
nutrients. Infiltration trenches and basins treat storm water runoff through
filtration. A typical infiltration trench is essentially an excavated trench, which is
lined with filter fabric and backfilled with stones. Depth of the infiltration trench
ranges from three to eight feet and functions best in areas with permeable
soils, and water table and bedrock depth situated well below the bottom of the
trench. Trenches should not be used to trap coarse sediments, because large
sediment will likely clog the trench. Grass buffers can be installed to capture
sediment before it enters the trench to minimize clogging. Infiltration basins are
generally used for drainage areas between five to 50 acres. Infiltration basins
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 46
ll
000 \lI
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
can be either in -line or off -line, and may treat different volumes such as the
water quality volume or the two -year or 10 -year storm.
5. Prior to the issuance of the first grading permit and as a part of the project's compliance
with the National Pollutant Discharge Elimination System (NPDES) program, the
applicant shall file a Notice of Intent (NOI) with the Los Angeles Regional Water Quality
Control Board providing notification and intent to comply with the State of California
general permit. Prior to issuance of the first grading permit, a Storm Water Pollution
Prevention Plan ( SWPPP) must be completed for onsite and associated offsite
construction activities. A copy of the SWPPP must be available and implemented at the
construction site at all times. The SWPPP outlines the source control and /or treatment
control Best Management Practices (BMPs) that will avoid or mitigate runoff pollutants at
the construction site to the "maximum extent practicable ". A listing of these BMPs from
the California Storm Water Best Management Practice Handbook - Construction Activity
is provided below.
CA 1 Dewatering Operations. This operation requires the use of sediment controls to
prevent or reduce the discharge of pollutant to storm water from dewatering operations.
CA 2 Paving Operations. Prevent or reduce the runoff of pollutant from paving
operations by proper storage of materials, protecting storm drain facilities during
construction, and training employees.
CA 3 Structural Construction and Painting. Keep site and area clean and orderly, use
erosion control, use proper storage facilities, use safe products, and train employees to
prevent and reduce pollutant discharge to storm water facilities from construction and
painting.
CA 10 Material Delivery and Storage. Minimize the storage of hazardous materials on
the site. If stored onsite, keep in designated areas, install secondary containment,
conduct regular inspections, and train employees.
CA 11 Material Use. Prevent and reduce the discharge of pesticides, herbicides,
fertilizers, detergents, plaster, petroleum products and other hazardous materials from
entering the storm water.
CA 20 Solid Waste Management. This BMP describes the requirements to properly
design and maintain trash storage areas. The primary design feature requires the
storage of trash in covered areas.
CA 21 Hazardous Waste Management. This BMP describes the requirements to
properly design and maintain waste areas.
CA 23 Concrete Waste Management. Prevent and reduce pollutant discharge to storm
water from concrete waste by providing onsite and offsite washouts in designated areas
and training employees and consultants regarding their use.
CA 24 Sanitary Septic Water Management. Provide convenient, well- maintained
facilities, and arrange regular service and disposal of sanitary waste.
CA 30 Vehicle and Equipment Cleaning. Use offsite facilities or wash in designated
areas to reduce pollutant discharge into the storm drain facilities.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental\050512 Draft Findings.doc 47
V I", G "1
0 V ►V
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
CA 31 Vehicle and Equipment Fueling. Use offsite facilities or designated onsite
enclosed coverings to reduce pollutant discharge into the storm drain facilities.
CA 32 Vehicle and Equipment Maintenance. Use offsite facilities or designated onsite
enclosed areas with coverings to reduce pollutant discharge into the storm drain
facilities. In addition, run a "dry site" to prevent pollution discharge into storm drains.
CA 40 Employee and Subcontractor Training. Have training sessions for employees and
subcontractors to understand the need for implementation and usage of BMPs and the
need and purpose for keeping the site clean.
ESC 2 Preservation of Existing Vegetation. Minimize the removal of existing trees and
shrubs because they serve as erosion control.
ESC 10 Seeding and Planting. Provide soil stability by planting and seeding grasses,
trees, shrubs, vines, and ground cover.
ESC 11 Mulching. Stabilize cleared or freshly seeded areas with mulch.
ESC 20 Geotextiles and Mats. Natural or synthetics material can be used for soil
stability.
ESC Dust Control. Reduce wind erosion and dust generated by construction activities
by using dust control measures.
ESC 23 Construction Road Stabilization. All onsite vehicle transport routes should be
stabilized immediately after grading and frequently maintained to prevent erosion and
control dust.
ESC 24 Stabilized Construction Entrance. Stabilize the construction entrance area to
reduce amount of sediment tracked off the site.
ESC 30 Earth Dikes. Construct earth dikes of compacted soil to divert runoff or channel
water to a desired location.
ESC 31 Temporary Drains and Swales. Use temporary drains and swales to divert
offsite runoff around the construction site, stabilized areas, and direct it into sediment
basins or traps.
ESC 40 Outlet Protection. Use rock or grouted rock at outlet pipes to prevent scouring
of soil caused by high velocities.
ESC 41 Check Dams. Check dams reduce velocities of concentrated flows, thereby
reducing erosion, and promoting sedimentation behind the dams. Check dams are small
and placed across swales and drainage ditches.
ESC 50 Silt Fence. Composed of filter fabric, which have been entrenched, attached to
support poles and sometimes backed by wire fence support. Silt fences promote
sedimentation behind the fence of sediment -laden water.
ESC 51 Straw Bale Barrier. Place straw bales end to end in a level contour in a shallow
trench and stake them in place. The bales will detain runoff and promote sedimentation.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 48
0 () C
IN /-
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
ESC 52 Sand Bag Barriers. By stacking sand bags on a level contour, creates a barrier
to detain sediment -laden water. The barrier will promote sedimentation.
ESC 53 Brush or Rock Filter. Made of 3/ -inch to three -inch diameter rocks place on a
level contour or composed of brush wrapped in filter cloth and staked to the toe of the
slope will provide a sediment trap.
ESC 54 Storm Drain Inlet Protection. Devises that remove sediment from sediment
laden storm water before entering the storm drain inlet or catch basin.
ESC 55 Sediment Trap. A sediment trap is a small, excavated or bermed area where
runoff for small drainage areas can pass through allowing sediment to settle out.
Potentially Significant Impact Unless Mitigated: Effects of Human Activity on Wildlife
Human activity, including increased noise and the introduction of pets to the areas, could disrupt
normal behavior patterns of wildlife remaining on the site, creating a significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
10. Individuals using the Nature Preserve for passive recreation would result in disturbance
of natural open space areas adjacent to the development area. An appropriate plan for
the management of the Nature Preserve shall be submitted to the City of Moorpark. The
management plan shall include access points including parking and restrooms, signage
for trails and restricted uses, appropriate fencing, and restrictions on domestic animals.
This plan shall be written by a qualified biologist prior to issuance of the first grading
permit.
GEOLOGY AND SOILS
Potentially Significant Impact Unless Mitigated: Existing Onsite Reservoirs
The Specific Plan site contains several small reservoirs at the mouths of canyons in the
southern portion of the site which may pose hazards to downstream areas.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 49
00C v V 1
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of a projectdesign feature as identified in the Final Program EIR.
Project Design Feature
Final Program EIR Section 3.7: Geology and Soils
• The earth -fill dams that impound the existing onsite reservoirs will be removed.
Potentially Significant Impact Unless Mitigated: Well Abandonment
Grading activities will require the abandonment of onsite wells.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of the following standard condition and requirement as identified in the Final Program
EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.7: Geology and Soils
• Abandoned water and oil wells (if encountered) shall be abandoned following the
guidelines established by the California Department of Conservation, Division of Oil and
Gas and City Municipal Code requirements in Chapter 8.40 for water wells. The lead
agency associated with the potential abandonment of oil and injection wells is the
California Department of Conservation, Division of Oil, Gas and Geothermal Resources
( DOGGR). Existing inactive oil wells located within proposed development areas, if
encountered during grading, may require re- abandonment in accordance with the
current DOGGR regulations.
Potential water wells encountered during grading shall be abandoned in accordance with
the guidelines of the Ventura County Public Works Agency, Water Resources
Department. If underground storage tanks are encountered during grading, they shall be
abandoned in accordance with the guidelines of the Ventura County Resource
Management Agency, Environmental Health Division. The abandonment of wells and
disposal of underground storage tanks shall be observed by an environmental consultant
in conjunction with the pertinent regulatory agencies. Additional site assessments, soil
sampling and laboratory testing, and analyses may be required if potential contaminated
soils are encountered during grading due to the presence of underground facilities,
buried debris, stained soils, waste drums, tanks, or odorous soils.
Potentially Significant Impact Unless Mitigated: Seismic Activity
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 50
o f"I C 4
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
The Specific Plan site could experience ground motion and seismic shaking which would be
considered a significant impact. Onsite soils, including alluvial soils and surficial colluvium,
would potentially be subject to seismic settlement. Potentially significant impacts related to
slope stability are expected to occur from the creation of the cut and fill slopes within Saugus
Formation and Older Alluvium present on the project site.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features, standard conditions and requirements, and adoption of the
following mitigation measures as identified in the Final Program EIR.
Protect Design Features
Final Program EIR Section 3.7: Geology and Soils
• To ensure the health, safety, and general welfare of the public, and to minimize the risk
of danger to the public, the Specific Plan designates known seismic hazard areas as
public /private open space to the extent feasible.
Standard Conditions and Requirements
Final Program EIR Section 3.7: Geology and Soils
The proposed development, including the recreational lake, shall be designed in
compliance with the Uniform Building Code (UBC), accepted industry standards, and the
City's earthquake safety Municipal Code requirements in Chapter 15.32.
Mitigation Measures
Final Program EIR Section 3.7: Geology and Soils
1. Complete removal and recompaction of the alluvial deposits to geotechnically competent
materials shall be performed to the satisfaction of the City Engineer in areas proposed
for development if fill is to be placed on top of these sediments. Additional compressible
materials that will probably require removal include topsoil, colluvium infilling swales and
landslide grabens, surficial slumps, debris flows, landslide debris, and uncontrolled fills.
2. The small landslides in the southern and central portions of the Specific Plan site where
development is proposed shall be evaluated further prior to grading for parcel /tract maps
by an engineering geologist and a geotechnical engineer to determine their lateral
extent, depth, and potential instability from grading. If these areas are to be buried
under the proposed fills, partial to complete removal of the landslides during grading as
recommended by the reviewing engineer will be necessary to mitigate the effects of
settlement due to fill loads. The grading plan shall be subject to the approval of the City
Engineer.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 51
() V V +.f %-A 'J
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
3. During the review of tentative tract maps and discretionary permits, faults mapped within
the development area of the Specific Plan site shall be examined in the field by a
geologic engineer to verify their location and recency of movement. Exploratory work
shall be conducted to locate and define the activity status of the northeast to northwest -
trending faults that have been mapped within the area proposed for development. If an
active fault is encountered, structural setbacks away from the active fault shall be
prescribed by a certified engineering geologist.
4. Areas of loose, cohesionless soils (i.e., unconsolidated alluvial deposits, colluvium,
topsoil, and debris flow deposits) that may be susceptible to seismic ground shaking,
fault- induced ground rupture, liquefaction, landslides, or settlement shall be completely
removed and replaced with compacted fill during all grading activities for tract maps and
discretionary permits. This work shall be based on investigation by a geologist and
approved by the City Engineer. Areas underlain with artificial fill, especially where
placed as part of the oil field activities or in the reservoirs, shall also be removed and
recompacted during grading. Subdrains shall be placed according to a soils engineer's
recommendations along canyon bottoms. A geotechnical engineer shall evaluate areas
of sandy alluvial soils within the proposed development area that will not be removed
during grading for potential liquefaction and provide site - specific measures.
5. Prior to the issuance of grading permits for individual tracts or parcels, additional
detailed geotechnical investigations and slope stability analyses shall be performed for
the slopes impacted by seismically- induced landslides, and site- specific measures
implemented, as necessary. This shall include transitional landslide areas in the north -
central portion of the Specific Plan site. Mitigation alternatives for unstable slopes
include the construction of earthen buttresses, re- grading of the slopes to less steep
gradients, or delineation of structural setbacks. If some of the landslides that encroach
onto the northerly portion of the proposed development are left in place without
stabilization, a review of their stability under seismically loading shall be conducted and
remediated.
6. Concurrent with the submittal of all tentative tract maps, the project applicant shall
submit a detailed geologic and soils engineering report meeting the requirements of the
City of Moorpark Subdivision Ordinance. If the detailed investigation confirms the
existence of geologic hazards, the City Engineer shall require use limitations or special
earthquake resistant design features as appropriate. Other specific recommendations
included in the report shall be incorporated into the grading, building, and improvement
plans and permits for each discretionary permit required by the City of Moorpark.
Potentially Significant Impact Unless Mitigated: Potential for Compressible Soils and
Settlement
Onsite alluvial deposits, colluvial soils, and fill are considered to be compressible and the
potential for settlement is significant. The geotechnical hazard posed by soil expansion of
onsite soils is considered to be potentially significant.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 52
U0�;'�
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR,
Mitigation Measures
Final Program EIR Section 3.7: Geology and Soils
7. Development areas shall be stripped of vegetation and debris prior to the start of
grading. Irrigation lines and abandoned underground storage tanks (if encountered),
and water and oil wells shall be removed and disposed off the site. Any sump deposits
encountered on the site shall be identified and remediated as necessary. Prior to
placement of compacted fill, all compressible materials shall be removed. The grading
plan shall be approved by the City Engineer.
8. Construction of onsite structures shall begin only after settlement of fill materials in deep
canyon areas has been stabilized. In order to determine when settlement is complete,
laboratory testing and analysis by a geotechnical engineer shall be performed for as-
graded conditions on all tracts /parcels in areas over large canyon fills. An alternative
would be the installation of a settlement monitoring system. Determination of where
testing is required and findings of the stability analysis shall be approved by the City
Engineer prior to construction.
9. A determination of soil expansivity and development of appropriate remedial measures
shall be performed by a geotechnical engineer prior to site development. This
evaluation shall be performed during the subsurface geotechnical investigations. If
expansive clay is encountered at shallow depths, clay -rich soils shall be removed and
replaced with a specified thickness of non - expansive granular soil beneath the
structures, concrete slabs, and footings, as necessary. During grading of localized
expansive soils mixing with the more common, granular non - expansive soils present
onsite should be sufficient to mitigate this impact. Alternatively, mitigation of expansive
soils can be accomplished during construction by pre- saturation of the expansive
materials and /or reinforcement of the building foundations and slabs.
10. Prior to the issuance of the first grading permit, the applicant shall conduct a visual
inspection, with photographs, of the existing residences located along the south -
southwestern perimeter of the Specific Plan site and shall establish surface survey
monuments in the existing fill areas adjacent to these residences prior to grading of the
Specific Plan site. This information will establish a baseline of the existing conditions of
these residences prior to grading in order to compare home conditions at the completion
of grading.
SACommunity Development \DEV PMTS \S PM 1 -North Park \Environmental \050512 Draft Findings.doc 53
�V vv�
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Potentially Significant Impact Unless Mitigated: Surficial Slumping and Debris Flow
Hazards
Surficial slumping and debris flow hazards known to exist on the Specific Plan site are
considered to present a potentially significant impact to the Project.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
Mitigation Measures
Final Program EIR Section 3.7: Geology and Soils
11. Debris and /or retention basins shall be designed by the project applicant's engineer to
mitigate any debris flows that may emulate from the undeveloped portions of the site.
The project engineer shall perform regular field checks of the debris and retention basins
during the entire construction period and until the slopes and graded areas have been
revegetated to the satisfaction of the City Engineer and Community Development
Director. Following the first season storm after construction of backbone infrastructure,
the project engineer shall field check erosion control devices to confirm that they are
performing as designed. All subsequent annual field checks shall be performed by the
pertinent agency (e.g., Ventura County Watershed Protection, Maintenance District).
12. Prior to the issuance of each grading permit, debris flows and surficial slumping shall be
evaluated and permits conditioned so that surficial landslide and debris flow deposits are
either removed during mass grading or contained with an adequately -sized retaining
device, such as a debris basin, during construction of infrastructure. Additional
evaluation to determine the locations and potential debris flow volumes should be
performed during the design phase of the proposed debris basins.
Potentially Significant Impact Unless Mitigated: Landslide Hazards
Development within the location of the helispot, observatory, and two northernmost water tank
sites would result in significant impacts related to landslide hazards.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmenta1\050512 Draft Findings.doc 54
0 C °'''' 9
�/ v V
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Mitigation Measures
Final Program EIR Section 3.7: Geology and Soils
13. To mitigate potential large landslides in the north - central portion near the heliport,
observatory, and northernmost water tanks, the following mitigation measures shall be
implemented:
a. For the natural and proposed slopes on the southeast side of the landslide area,
slope trimming and /or construction of soldier piles is required.
b. For the natural slope adjacent to the northwest of the proposed water tank site (head
scarp area of the existing landslide complex), construction of soldier piles extending
below the potential failure surfaces and /or construction of shear /buttress keys and
fills in the upper portion (head scarp area) of the existing landslide complex is
required.
or
c. Alternately, the helipad, observatory, and water tanks shall be shifted to the south,
away from the existing landslide, along the existing ridgelines for approximately 50 to
100 feet.
Potentially Significant Impact Unless Mitigated: Presence of Permeable Materials in
Saugus Formation Affecting Lake
The lake is sited in an area of Saugus Formation bedrock which contains potentially permeable
materials that could adversely affect the structural performance of the lake.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of standard conditions and requirements, and adoption of the following mitigation
measure as identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.7: Geology and Soils
The proposed development, including the recreational lake, shall be designed in
compliance with the Uniform Building Code (UBC), accepted industry standards, and the
City's earthquake safety Municipal Code requirements in Chapter 15.32.
The design and construction of the lake shall comply with current dam safety design
standards as set forth by the State of California Department of Water Resources,
Division of Safety of Dams (DSOD) requirements, to reduce the hazard of seiche and
potential inundation of downstream areas in the event of dam failure. To the extent
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 55
'v i. v
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
required by law, the detention basin structures shall also comply with the DSOD
requirements for their design and construction.
Mitigation Measure
Final Program EIR Section 3.7: Geology and Soils
14. To ensure low permeability of the lake lining, special handling (i.e., special stockpiling
and mixing procedures) of the Saugus Formation bedrock mined for the lining shall be
required. Further laboratory testing of the stockpiled materials shall also be required to
confirm the suitability of these soils prior to their placement. Additionally, the soils
derived from this bed shall be mixed with soils having a higher percentage of particles
that were two microns in size, as determined by the project geologist.
Potentially Significant Impact Unless Mitigated: Erosion Potential
The potential for erosion of onsite materials during construction, especially during periods of
heavy rain, is considered a short-term significant impact. During wet winters, debris flows
emanating from the canyons, especially if laden with landslide debris, could pose a serious
threat to life and property, which would be considered a potentially significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features, standard conditions and requirements, and mitigation
measures as identified in the Final Program EIR.
Project Design Features
Final Program EIR Section 3.8: Hydrology and Water Quality
• As a part of the Phase A and buildout projects, the project design incorporates onsite
debris and retention basins.
Standard Conditions and Requirements
Final Program EIR Section 3.7: Geology and Soils
Prior to issuance of a grading permit for any development on the Specific Plan site, the
project applicant shall submit an erosion control plan to the City Engineer for review and
approval. The erosion control plan shall include measures to reduce the amount of
onsite and offsite erosion during construction of the proposed project, proper care of
drainage control devices, proper irrigation, rodent control, and landscaping. To
supplement the erosion control plan, hydroseeding of affected graded slopes shall be
performed by the project applicant within 30 days of grading of the slope area.
SACommunity Development\DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 56
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Final Program EIR Section 3.8: Hydrology and Water Quality
• During grading, the following requirements shall apply:
a. Grading may occur during the rainy season from October 15th to April 15th subject to
approval by the City Engineer and installation of erosion control facilities. Erosion
control measures shall be in place and functional between October 15th and
April 15th. In order to comply with the October 15 date, revised erosion control plans
shall be submitted to the City Engineer, no later than September 15th of each year
from the start of grading or clearing operations to the time of grading bond release.
b. Temporary irrigation, hydroseeding and erosion control measures shall be
implemented on all temporary grading. Temporary grading is defined to be any
grading partially completed and any disturbance of existing natural conditions due to
construction activity. These measures will apply to temporary grading activity that
remains or is anticipated to remain unfinished or undisturbed in its altered condition
for a period of time greater than 30 days or the beginning of the rainy season
whichever comes first.
Mitigation Measures
Final Program EIR Section 3.8: Hydrology and Water Quality
3. During site preparation and construction, the contractor shall minimize disturbance of
natural groundcover on the project site until such activity is required for grading and
construction purposes. During grading operations, the developer shall employ a full -time
superintendent for National Pollutant Discharge Elimination System ( NPDES)
compliance. If determined necessary by the City Engineer, the NPDES superintendent
shall be present on the project site Monday through Friday and on all other days when
the probability of rain is 40 percent or higher and prior to the start of and during all
grading or clearing operations until the release of grading bonds. The NPDES
superintendent shall have full authority to hire personnel, bind the developer in contracts,
rent equipment, and purchase materials to the extent needed to effectuate Best
Management practices. The NPDES superintendent shall provide proof to the City
Engineer of attendance and satisfactory completion of courses satisfactory to the City
Engineer totaling no less than eight hours directed specifically to NPDES compliance
and effective use of Best Management Practices. Proof of such attendance and
completion shall be provided to the City Engineer prior to employment of the NPDES
superintendent.
4. Prior to issuance of the initial grading permit, the applicant shall have prepared a Storm
Water Quality Urban Impact Mitigation Plan (SQUIMP) and include Non - Structural,
Source Control, and Structural Best Management Practices (BMPs). A Certified Erosion
and Sediment Control Professional or qualified Civil Engineer shall prepare the
SQUIMP. The SQUIMP shall be reviewed and approved by the Moorpark Community
Development Director and City Engineer. The development of the SQUIMP shall
conform to the Ventura County National Pollutant Discharge Elimination System permit,
the SQUIMP standards, and the Technical Guidance Manual for Storm Water Quality
Control Measures. The following are the minimum required mitigation from the
Technical Guidance Manual for Storm Water Quality Control Measures.
General Site Design
SACommunity DevelopmenADEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 57
0 �kR4 Co' r"}n
North Park Village and Nature Preserve Specific Plan
Final Program E1R No. 2001 -01
Draft Findings of Fact
G -1 Conserve Natural Areas. This measure involves locating development on the
least sensitive portion of a site and conserving naturally vegetated areas. This
measure can minimize environmental impacts in general and storm water runoff
impacts in particular. The design of the North Park Specific Plan currently
incorporates some of these planning measures.
G -2 Protect Slopes and Channels. If not properly protected and stabilized, erosion of
slopes and channels can be major sources of sediment and associated
pollutants, such as nutrients. Channel stability and erosion control measures
shall be analyzed and discussed the Master Plan of Drainage (see Mitigation
Measure 1).
G -3 Control Peak Storm Water Runoff Discharge Rates. Unless controlled, peak
storm water runoff rates from developed areas are typically higher than those
from previously undeveloped areas. Higher peak flows can change stream
morphology and increase downstream erosion that can damage stream habitat,
impact aesthetic values, and convey larger pollutant loads to receiving waters.
Therefore, the project must mitigate the post - development discharge rates to less
than the existing storm event peak flow rates.
G -4 Minimize Impervious Area. Suggested strategies for minimizing imperviousness
through site design include: reduce footprints of buildings and parking lots,
cluster buildings and paved areas, use minimum allowable roadway and sidewalk
sections and parking stall widths, include landscape islands in cul -de -sacs, use
pervious pavement materials, provide grassy bioswale area that meet NPDES
requirements within the downstream portions of the lot areas protected and
maintained by Homeowner Associations, and use grass -lined channels or
surface swales to convey runoff instead of paved gutters. Such measures shall
be included in the SQUIMP portion of the Master Plan of Drainage.
G -5 Minimize Effective Imperviousness. This approach involves routing runoff from
impervious areas over grassy areas or other pervious areas prior to discharge to
the storm drainage system or receiving water to reduce peak flows, reduce total
runoff volume and provide some degree of pollutant removal. Three methods for
minimizing effective imperviousness include turf buffers, grassy bioswale areas
that meet NPDES requirements within the downstream portions of the lot areas
that are protected and maintained by a Homeowners Association, and grass -
lined channels. This approach shall be addressed in the SQUIMP portion of the
Drainage Master Plan.
Site - Specific Source Control
The SQUIMP portion of the Drainage Master Plan shall address:
S -1 Storm Drain Message and Signage. The appropriate locations for the signage
regarding discharge prohibitions at storm drain inlets and a standard message to
be used throughout the Specific Plan site.
S -2 Outdoor Material Storage Area Design
material storage area design.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc
General design criteria for outdoor
58
�1 1 ! `� P"1
( 0 _* $
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
S -3 Outdoor Trash Storage and Waste Handling Area Design. General design
criteria for outdoor trash storage and waste handling area design.
S -4 Outdoor Loading /Unloading Dock Area Design. General design criteria for
outdoor loading /unloading dock area design.
S -5 Outdoor Repair /Maintenance Bay Design. General design criteria for outdoor
repair and maintenance bay design.
S -6 Outdoor Vehicle /Equipment/Accessory Washing Area Design. General design
criteria for outdoor vehicle, equipment, and accessory washing area design.
S -7 Fueling Area Design. General design criteria for fueling area design.
S -8 Proof of Control Measure Maintenance. To ensure that maintenance is provided,
the County of Ventura Watershed Protection District may require a Maintenance
Agreement and a Maintenance Plan from the owner /operator of the storm water
control measures. The SQUIMP shall identify the party(ies) responsible for
maintenance of control measures.
Structural/Treatment BMPs
The SQUIMP shall include structural and /or treatment BMPs. The structural BMPs shall
focus on meeting potential TMDL and pollutant standards for residential developments.
The treatment BMPs shall conform to the Technical Guidance Manual for Storm Water
Control Measures. The SQUIMP guidelines contained in the National Pollutant
Discharge Elimination System (NPDES) Permit and Waste Discharge Requirements for
Ventura County state that Structural BMPs are required for all new developments. The
structural BMPs shall be sized to comply with one of the following numeric sizing criteria,
unless an alternative is considered by the permittees to provide equivalent or better
treatment. Ground water quality must be evaluated based on the amount of water and
the potential pollutants that my be introduced associated with the buildout of the Specific
Plan site.
Volume -based BMPs shall be designed to infiltrate or treat either:
a. The volume of annual runoff based on unit basin storage water quality volume, to
achieve 80 percent or more volume treatment by the method recommended in the
California Storm Water Best Management Practices Handbook — Industrial/
Commercial (1993), the Ventura Countywide Storm Water Quality Management
Program Land Development Guidelines, or;
b. The 85`h percentile 24 -hour runoff event determined as the maximized capture storm
water volume for the area, from the formula recommended in Urban Runoff Quality
Management, WEF Manual of Practice No. 231ASCE Manual of Practice No. 87
(1998), or;
c. The volume of runoff produced for a 0.75 inch storm event, prior to its discharge to a
storm water conveyance system, or;
d. The volume of runoff produced from a historical- record based reference 24 -hour
rainfall criterion for "treatment" that achieves approximately reduction in pollutant
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc (® 59
Ifs ,o 1 �
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
loads achieved by the 85th percentile 24 -hour runoff event. The volume of runoff
produced from the 85th percentile 24 -hour storm event, as determined from the local
historical rainfall record;
or
Flow -based BMPs shall be designed to infiltrate or treat either:
a. 10 percent of the 50 -year design flow rate, or;
b. A flow that will result in treatment of the same portion of runoff as treated using
volumetric standards, or;
c. A rain event equal to at least 0.2 inches per hour intensity, or;
d. A rain event equal to at least two times the 85th percentile hourly rainfall intensity for
Ventura County.
The Technical Guidance Manual for Storm Water Quality Control Measures requires that
treatment controls measures be used for any new development. The following is a
partial list of treatment control measures that may be used by the applicant:
T -1
Grass Strip Filter
T -2
Grass Swale Filter
T -3
Extended Detention Basin
T -4
Wet Detention Basin
T -5
Constructed Wetland
T -6 Detention Basin /Sand Filter
T -7 Porous Pavement Detention
T -8 Porous Landscape Detention
T -9 Infiltration Basin
T -10 Infiltration Trench
The following discussion identifies treatment control measures that are appropriate for
use on the North Park Specific Plan site:
T -1 & -2: Grass Strip and Swales. An appropriate treatment is either vegetative swales,
enhanced vegetated swales utilizing check dams and wide depressions, a
series of small detention facilities designed similarly to a dry detention basin, or
a combination of these treatment methods into a treatment train (a series of
Structural BMPs). It is essential that the SQUIMP address treatment for North
Park to assure that the runoff from the site be treated to the "maximum extent
practicable ".
SACommunity Development \DEV PMTS\S P \11 -North Park \Environmental \050512 Draft Findings.doc p 60
ly,v� v'01�
J
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
In order for the vegetation swales to be effective in the removal of potential
pollutants, the swales must be treated as water quality features and must be
maintained differently than grass areas. Specifically, pesticides, herbicides,
and fertilizers, which may be used on the grass areas, must not be used in the
vegetation swales.
T -3: Extended Detention Basins (T -3). Construction of extended detention basins
within the proposed retention basin is likely the most efficient way of treating
storm water runoff from North Park. The purpose of the extended detention
basin is to aid in the removal mechanism: settling or sedimentation; adsorption
to sediments, vegetation, or detritus; filtration by plants; microbial uptake and /or
transformation; and uptake by wetland plants or algae. The removal of the
urban runoff pollutants occurs during the slow draining of the basin (minimum
24 hours).
Water Quality Basins are expected to reduce the following pollutants: total
suspended solids, total phosphorous, total nitrogen, chemical oxygen demand
(COD), total lead, total zinc, total copper, and bacteria.
If other treatment controls are used, such as those discussed below, the
treatment volumes for the extended detention basins can be reduced or
eliminated. Several of the following treatment control measures could be used
within the development in parks or single lots.
T -9 & -10 Infiltration Trenches and Basins. Infiltration Trenches and /or Basins may be
used onsite to meet potential future TMDLs for noxious aquatic plants and
nutrients. Infiltration trenches and basins treat storm water runoff through
filtration. A typical infiltration trench is essentially an excavated trench, which is
lined with filter fabric and backfilled with stones. Depth of the infiltration trench
ranges from three to eight feet and functions best in areas with permeable
soils, and water table and bedrock depth situated well below the bottom of the
trench. Trenches should not be used to trap coarse sediments, because large
sediment will likely clog the trench. Grass buffers can be installed to capture
sediment before it enters the trench to minimize clogging. Infiltration basins are
generally used for drainage areas between five to 50 acres. Infiltration basins
can be either in -line or off -line, and may treat different volumes such as the
water quality volume or the two -year or 10 -year storm.
5. Prior to the issuance of the first grading permit and as a part of the project's compliance
with the National Pollutant Discharge Elimination System (NPDES) program, the
applicant shall file a Notice of Intent (NOI) with the Los Angeles Regional Water Quality
Control Board providing notification and intent to comply with the State of California
general permit. Prior to issuance of the first grading permit, a Storm Water Pollution
Prevention Plan ( SWPPP) must be completed for onsite and associated offsite
construction activities. A copy of the SWPPP must be available and implemented at the
construction site at all times. The SWPPP outlines the source control and /or treatment
control Best Management Practices (BMPs) that will avoid or mitigate runoff pollutants at
the construction site to the "maximum extent practicable ". A listing of these BMPs from
the California Storm Water Best Management Practice Handbook - Construction Activity
is provided below.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 61
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
CA 1 Dewatering Operations. This operation requires the use of sediment controls to
prevent or reduce the discharge of pollutant to storm water from dewatering operations.
CA 2 Paving Operations. Prevent or reduce the runoff of pollutant from paving
operations by proper storage of materials, protecting storm drain facilities during
construction, and training employees.
CA 3 Structural Construction and Painting. Keep site and area clean and orderly, use
erosion control, use proper storage facilities, use safe products, and train employees to
prevent and reduce pollutant discharge to storm water facilities from construction and
painting.
CA 10 Material Delivery and Storage. Minimize the storage of hazardous materials on
the site. If stored onsite, keep in designated areas, install secondary containment,
conduct regular inspections, and train employees.
CA 11 Material Use. Prevent and reduce the discharge of pesticides, herbicides,
fertilizers, detergents, plaster, petroleum products and other hazardous materials from
entering the storm water.
CA 20 Solid Waste Management. This BMP describes the requirements to properly
design and maintain trash storage areas. The primary design feature requires the
storage of trash in covered areas.
CA 21 Hazardous Waste Management. This BMP describes the requirements to
properly design and maintain waste areas.
CA 23 Concrete Waste Management. Prevent and reduce pollutant discharge to storm
water from concrete waste by providing onsite and offsite washouts in designated areas
and training employees and consultants regarding their use.
CA 24 Sanitary Septic Water Management. Provide convenient, well- maintained
facilities, and arrange regular service and disposal of sanitary waste.
CA 30 Vehicle and Equipment Cleaning. Use offsite facilities or wash in designated
areas to reduce pollutant discharge into the storm drain facilities.
CA 31 Vehicle and Equipment Fueling. Use offsite facilities or designated onsite
enclosed coverings to reduce pollutant discharge into the storm drain facilities.
CA 32 Vehicle and Equipment Maintenance. Use offsite facilities or designated onsite
enclosed areas with coverings to reduce pollutant discharge into the storm drain
facilities. In addition, run a "dry site" to prevent pollution discharge into storm drains.
CA 40 Employee and Subcontractor Training. Have training sessions for employees and
subcontractors to understand the need for implementation and usage of BMPs and the
need and purpose for keeping the site clean.
ESC 2 Preservation of Existing Vegetation. Minimize the removal of existing trees and
shrubs because they serve as erosion control.
ESC 10 Seeding and Planting. Provide soil stability by planting and seeding grasses,
trees, shrubs, vines, and ground cover.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 62
0 V n •
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
ESC 11 Mulching. Stabilize cleared or freshly seeded areas with mulch
ESC 20 Geotextiles and Mats. Natural or synthetics material can be used for soil
stability.
ESC Dust Control. Reduce wind erosion and dust generated by construction activities
by using dust control measures.
ESC 23 Construction Road Stabilization. All onsite vehicle transport routes should be
stabilized immediately after grading and frequently maintained to prevent erosion and
control dust.
ESC 24 Stabilized Construction Entrance. Stabilize the construction entrance area to
reduce amount of sediment tracked off the site.
ESC 30 Earth Dikes. Construct earth dikes of compacted soil to divert runoff or channel
water to a desired location.
ESC 31 Temporary Drains and Swales. Use temporary drains and swales to divert
offsite runoff around the construction site, stabilized areas, and direct it into sediment
basins or traps.
ESC 40 Outlet Protection. Use rock or grouted rock at outlet pipes to prevent scouring
of soil caused by high velocities.
ESC 41 Check Dams. Check dams reduce velocities of concentrated flows, thereby
reducing erosion, and promoting sedimentation behind the dams. Check dams are small
and placed across swales and drainage ditches.
ESC 50 Silt Fence. Composed of filter fabric, which have been entrenched, attached to
support poles and sometimes backed by wire fence support. Silt fences promote
sedimentation behind the fence of sediment -laden water.
ESC 51 Straw Bale Barrier. Place straw bales end to end in a level contour in a shallow
trench and stake them in place. The bales will detain runoff and promote sedimentation.
ESC 52 Sand Bag Barriers. By stacking sand bags on a level contour, creates a barrier
to detain sediment -laden water. The barrier will promote sedimentation.
ESC 53 Brush or Rock Filter. Made of 3/ -inch to three -inch diameter rocks place on a
level contour or composed of brush wrapped in filter cloth and staked to the toe of the
slope will provide a sediment trap.
ESC 54 Storm Drain Inlet Protection. Devises that remove sediment from sediment
laden storm water before entering the storm drain inlet or catch basin.
ESC 55 Sediment Trap. A sediment trap is a small, excavated or bermed area where
runoff for small drainage areas can pass through allowing sediment to settle out.
SACommunity Development \DEV PMTS \S P \11 -North Park\Environmental\050512 Draft Findings.doc 63
V �V tki/ h !v 17J
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
HYDROLOGY AND WATER QUALITY
Potentially Significant Impact Unless Mitigated: Surface Runoff
Implementation of Phase A would result in increased runoff at discharge point G for 2- and
5 -year storm events. The North Park development would result in an increase in impervious
areas on the site and would increase the tributary areas to discharge points B, E, and G.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and adoption of the following mitigation measures as
identified in the Final Program EIR.
Project Design Features
Final Program EIR Section 3.8: Hydrology and Water Quality
As a part of the Phase A and buildout projects, the project design incorporates onsite
debris and retention basins.
Mitigation Measures
Final Program EIR Section 3.8: Hydrology and Water Quality
The applicant shall be responsible for the preparation of a comprehensive Master Plan
of Drainage for the North Park Specific Plan Site in conjunction with the Ventura County
Watershed Protection District adopted Master Drainage Plan. The Master Plan shall
address: hydrology, detention basin design, storm water Best Management Practices
(BMPs), and stream stability associated with the Phase A and buildout projects. The
Master Plan shall be submitted to the City of Moorpark and the County of Ventura for
approval prior to the issuance of the first grading permit.
2. The applicant shall be responsible for the preparation of a Runoff Management Plan
(RMP) to be approved by the City of Moorpark City Engineer prior to the issuance of the
first grading permit. The Ventura County Watershed Protection District adopted Master
Drainage Plan and the Ventura County Watershed Protection Design and Hydrology
Manuals shall be used as the basis for the RMP. At a minimum, the RMP shall include
the following information:
a. Time of Concentration Calculations for each storm event for existing and buildout
conditions.
b. For buildout conditions, a master plan of "back bone" storm drain facilities routing
shall be included in the rational method calculations.
SACommunity Development \DEV PMTS\S P \11 -North Park \Environmental \050512 Draft Findings.doc 64
0 0 0 v, "9
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
c. Impervious ratios for onsite development shall correspond to the Calleguas Creek
Master Hydrology Study.
d. Rational method runs for all storm events using the VCRAT program.
e. Detailed calculations for flow -by and flow- through retention and detention basins.
f. Determination of State Division of Safety of Dams jurisdictional criteria and
documentation on which basins fall within State Division of Safety of Dams
jurisdiction.
g. Channel stability and sediment transport analysis for any natural areas adjacent to
development. This analysis shall include the natural drainage downstream of all
discharge points. In areas, where the stability analysis indicates that channel
degradation is likely, channel stabilization or other City approved measure shall be
implemented.
Potentially Significant Impact Unless Mitigated: Storm Water Quality
Phase A of the Project would increase impervious areas and introduce new land uses that
would impact storm water quality by increasing pollutant loading immediately downstream of the
site and possibly in the Arroyo Simi.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features, standard conditions and requirements, and adoption of the
following mitigation measures as identified in the Final Program EIR.
Project Design Features
Final Program EIR Section 3.8: Hydrology and Water Quality
• As a part of the Phase A and buildout projects, the project design incorporates onsite
debris and retention basins.
Standard Conditions and Requirements
Final Program EIR Section 3.8: Hydrology and Water Quality
• During grading, the following requirements shall apply:
a. Grading may occur during the rainy season from October 15th to April 15th subject to
approval by the City Engineer and installation of erosion control facilities. Erosion
control measures shall be in place and functional between October 15th and April
15th. In order to comply with the October 15 date, revised erosion control plans shall
SACommunity Development \DEV PMTS\S P \11 -North Park \Environmental \050512 Draft Findings.doc 65
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
be submitted to the City Engineer, no later than September 15th of each year from
the start of grading or clearing operations to the time of grading bond release.
b. Temporary irrigation, hydroseeding and erosion control measures shall be
implemented on all temporary grading. Temporary grading is defined to be any
grading partially completed and any disturbance of existing natural conditions due to
construction activity. These measures will apply to temporary grading activity that
remains or is anticipated to remain unfinished or undisturbed in its altered condition
for a period of time greater than 30 days or the beginning of the rainy season
whichever comes first.
Mitigation Measures
Final Program EIR Section 3.8: Hydrology and Water Quality
3. During site preparation and construction, the contractor shall minimize disturbance of
natural groundcover on the project site until such activity is required for grading and
construction purposes. During grading operations, the developer shall employ a full -time
superintendent for National Pollutant Discharge Elimination System ( NPDES)
compliance. The NPDES superintendent shall be present on the project site Monday
through Friday and on all other days when the probability of rain is 40 percent or higher
and prior to the start of and during all grading or clearing operations until the release of
grading bonds. The NPDES superintendent shall have full authority to hire personnel,
bind the developer in contracts, rent equipment, and purchase materials to the extent
needed to effectuate Best Management practices. The NPDES superintendent shall
provide proof to the City Engineer of attendance and satisfactory completion of courses
satisfactory to the City Engineer totaling no less than 8 hours directed specifically to
NPDES compliance and effective use of Best Management Practices. Proof of such
attendance and completion shall be provided to the City Engineer prior to employment of
the NPDES superintendent.
4. Prior to issuance of the initial grading permit, the applicant shall have prepared a Storm
Water Quality Urban Impact Mitigation Plan (SQUIMP) and include Non - Structural,
Source Control, and Structural Best Management Practices (BMPs). A Certified Erosion
and Sediment Control Professional or qualified Civil Engineer shall prepare the
SQUIMP. The SQUIMP shall be reviewed and approved by the Moorpark Community
Development Director and City Engineer. The development of the SQUIMP shall
conform to the Ventura County National Pollutant Discharge Elimination System permit,
the SQUIMP standards, and the Technical Guidance Manual for Storm Water Quality
Control Measures. The following are the minimum required mitigation from the
Technical Guidance Manual for Storm Water Quality Control Measures.
General Site Design
G -1 Conserve Natural Areas. This measure involves locating development on the
least sensitive portion of a site and conserving naturally vegetated areas. This
measure can minimize environmental impacts in general and storm water runoff
impacts in particular. The design of the North Park Specific Plan currently
incorporates some of these planning measures.
G -2 Protect Slopes and Channels. If not properly protected and stabilized, erosion of
slopes and channels can be major sources of sediment and associated
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 66
0 ; fl� r) A
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
pollutants, such as nutrients. Channel stability and erosion control measures
shall be analyzed and discussed the Master Plan of Drainage (see Mitigation
Measure 1).
G -3 Control Peak Storm Water Runoff Discharge Rates. Unless controlled, peak
storm water runoff rates from developed areas are typically higher than those
from previously undeveloped areas. Higher peak flows can change stream
morphology and increase downstream erosion that can damage stream habitat,
impact aesthetic values, and convey larger pollutant loads to receiving waters.
Therefore, the project must mitigate the post - development discharge rates to less
than the existing storm event peak flow rates.
G -4 Minimize Impervious Area. Suggested strategies for minimizing imperviousness
through site design include: reduce footprints of buildings and parking lots,
cluster buildings and paved areas, use minimum allowable roadway and sidewalk
sections and parking stall widths, include landscape islands in cul -de -sacs, use
pervious pavement materials, provide grassy bioswale area that meet NPDES
requirements within the downstream portions of the lot areas protected and
maintained by Homeowner Associations, and use grass -lined channels or
surface swales to convey runoff instead of paved gutters. Such measures shall
be included in the SQUIMP portion of the Master Plan of Drainage.
G -5 Minimize Effective Imperviousness. This approach involves routing runoff from
impervious areas over grassy areas or other pervious areas prior to discharge to
the storm drainage system or receiving water to reduce peak flows, reduce total
runoff volume and provide some degree of pollutant removal. Three methods for
minimizing effective imperviousness include turf buffers, grassy bioswale areas
that meet NPDES requirements within the downstream portions of the lot areas
that are protected and maintained by a Homeowners Association, and grass -
lined channels. This approach shall be addressed in the SQUIMP portion of the
Drainage Master Plan.
Site - Specific Source Control
The SQUIMP portion of the Drainage Master Plan shall address:
S -1 Storm Drain Message and Signage. The appropriate locations for the signage
regarding discharge prohibitions at storm drain inlets and a standard message to
be used throughout the Specific Plan site.
S -2 Outdoor Material Storage Area Design. General design criteria for outdoor
material storage area design.
S -3 Outdoor Trash Storage and Waste Handling Area Design. General design
criteria for outdoor trash storage and waste handling area design.
S -4 Outdoor Loading /Unloading Dock Area Design. General design criteria for
outdoor loading /unloading dock area design.
S -5 Outdoor Repair /Maintenance Bay Design. General design criteria for outdoor
repair and maintenance bay design.
SACommunity Development \DEV PMTS\S P\11 -North Park \Environmental \050512 Draft Findings.doc 67
North Park Village and Nature Preserve Specific Plan
Final Program E1R No. 2001 -01
Draft Findinos of Fact
S -6 Outdoor Vehicle /Equipment/Accessory Washing Area Design. General design
criteria for outdoor vehicle, equipment, and accessory washing area design.
S -7 Fueling Area Design. General design criteria for fueling area design.
S -8 Proof of Control Measure Maintenance. To ensure that maintenance is provided,
the County of Ventura Watershed Protection District may require a Maintenance
Agreement and a Maintenance Plan from the owner /operator of the storm water
control measures. The SQUIMP shall identify the party(ies) responsible for
maintenance of control measures.
Structural/Treatment BMPs
The SQUIMP shall include structural and /or treatment BMPs. The structural BMPs shall
focus on meeting potential TMDL and pollutant standards for residential developments.
The treatment BMPs shall conform to the Technical Guidance Manual for Storm Water
Control Measures. The SQUIMP guidelines contained in the National Pollutant
Discharge Elimination System (NPDES) Permit and Waste Discharge Requirements for
Ventura County state that Structural BMPs are required for all new developments. The
structural BMPs shall be sized to comply with one of the following numeric sizing criteria,
unless an alternative is considered by the permittees to provide equivalent or better
treatment. Ground water quality must be evaluated based on the amount of water and
the potential pollutants that may be introduced associated with the buildout of the
Specific Plan site.
Volume -based BMPs shall be designed to infiltrate or treat either:
a. The volume of annual runoff based on unit basin storage water quality volume, to
achieve 80 percent or more volume treatment by the method recommended in the
California Storm Water Best Management Practices Handbook — Industrial/
Commercial (1993), the Ventura Countywide Storm Water Quality Management
Program Land Development Guidelines, or;
b. The 85th percentile 24 -hour runoff event determined as the maximized capture storm
water volume for the area, from the formula recommended in Urban Runoff Quality
Management, WEF Manual of Practice No. 231ASCE Manual of Practice No. 87
(1998), or;
c. The volume of runoff produced for a 0.75 inch storm event, prior to its discharge to a
storm water conveyance system, or;
d. The volume of runoff produced from a historical- record based reference 24 -hour
rainfall criterion for "treatment' that achieves approximately reduction in pollutant
loads achieved by the 851h percentile 24 -hour runoff event. The volume of runoff
produced from the 85th percentile 24 -hour storm event, as determined from the local
historical rainfall record;
or
Flow -based BMPs shall be designed to infiltrate or treat either:
a. 10 percent of the 50 -year design flow rate, or;
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 68
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
b. A flow that will result in treatment of the same portion of runoff as treated using
volumetric standards, or;
c. A rain event equal to at least 0.2 inches per hour intensity, or;
d. A rain event equal to at least two times the 85th percentile hourly rainfall intensity for
Ventura County.
The Technical Guidance Manual for Storm Water Quality Control Measures requires that
treatment controls measures be used for any new development. The following is a
partial list of treatment control measures that may be used by the applicant:
T -1 Grass Strip Filter
T -2 Grass Swale Filter
T -3 Extended Detention Basin
T -4 Wet Detention Basin
T -5 Constructed Wetland
T -6 Detention Basin /Sand Filter
T -7 Porous Pavement Detention
T -8 Porous Landscape Detention
T -9 Infiltration Basin
T -10 Infiltration Trench
The following discussion identifies treatment control measures that are appropriate for
use on the North Park Specific Plan site:
T-1&-2: Grass Strip and Swales. An appropriate treatment is either vegetative swales,
enhanced vegetated swales utilizing check dams and wide depressions, a
series of small detention facilities designed similarly to a dry detention basin, or
a combination of these treatment methods into a treatment train (a series of
Structural BMPs). It is essential that the SQUIMP address treatment for North
Park to assure that the runoff from the site be treated to the "maximum extent
practicable ".
In order for the vegetation swales to be effective in the removal of potential
pollutants, the swales must be treated as water quality features and must be
maintained differently than grass areas. Specifically, pesticides, herbicides,
and fertilizers, which may be used on the grass areas, must not be used in the
vegetation swales.
T -3: Extended Detention Basins (T -3). Construction of extended detention basins
within the proposed retention basin is likely the most efficient way of treating
storm water runoff from North Park. The purpose of the extended detention
basin is to aid in the removal mechanism: settling or sedimentation; adsorption
SACommunity Development\DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 69
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
to sediments, vegetation, or detritus; filtration by plants; microbial uptake and /or
transformation; and uptake by wetland plants or algae. The removal of the
urban runoff pollutants occurs during the slow draining of the basin (minimum
24 hours).
Water Quality Basins are expected to reduce the following pollutants: total
suspended solids, total phosphorous, total nitrogen, chemical oxygen demand
(COD), total lead, total zinc, total copper, and bacteria.
If other treatment controls are used, such as those discussed below, the
treatment volumes for the extended detention basins can be reduced or
eliminated. Several of the following treatment control measures could be used
within the development in parks or single lots.
T -9 & -10 Infiltration Trenches and Basins. Infiltration Trenches and /or Basins may be
used onsite to meet potential future TMDLs for noxious aquatic plants and
nutrients. Infiltration trenches and basins treat storm water runoff through
filtration. A typical infiltration trench is essentially an excavated trench, which is
lined with filter fabric and backfilled with stones. Depth of the infiltration trench
ranges from three to eight feet and functions best in areas with permeable
soils, and water table and bedrock depth situated well below the bottom of the
trench. Trenches should not be used to trap coarse sediments, because large
sediment will likely clog the trench. Grass buffers can be installed to capture
sediment before it enters the trench to minimize clogging. Infiltration basins are
generally used for drainage areas between five to 50 acres. Infiltration basins
can be either in -line or off -line, and may treat different volumes such as the
water quality volume or the two -year or 10 -year storm.
5. Prior to the issuance of the first grading permit and as a part of the project's compliance
with the National Pollutant Discharge Elimination System (NPDES) program, the
applicant shall file a Notice of Intent (NOI) with the Los Angeles Regional Water Quality
Control Board providing notification and intent to comply with the State of California
general permit. Prior to issuance of the first grading permit, a Storm Water Pollution
Prevention Plan ( SWPPP) must be completed for onsite and associated offsite
construction activities. A copy of the SWPPP must be available and implemented at the
construction site at all times. The SWPPP outlines the source control and /or treatment
control Best Management Practices (BMPs) that will avoid or mitigate runoff pollutants at
the construction site to the "maximum extent practicable ". A listing of these BMPs from
the California Storm Water Best Management Practice Handbook- Construction Activity
is provided below.
CA 1 Dewatering Operations. This operation requires the use of sediment controls to
prevent or reduce the discharge of pollutant to storm water from dewatering operations.
CA 2 Paving Operations. Prevent or reduce the runoff of pollutant from paving
operations by proper storage of materials, protecting storm drain facilities during
construction, and training employees.
CA 3 Structural Construction and Painting. Keep site and area clean and orderly, use
erosion control, use proper storage facilities, use safe products, and train employees to
prevent and reduce pollutant discharge to storm water facilities from construction and
painting.
SACommunity Development \DEV PMTS\S P\11 -North Park \Environmental \050512 Draft Findings.doc 70
0 00 IC �5
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
CA 10 Material Delivery and Storage. Minimize the storage of hazardous materials on
the site. If stored onsite, keep in designated areas, install secondary containment,
conduct regular inspections, and train employees.
CA 11 Material Use. Prevent and reduce the discharge of pesticides, herbicides,
fertilizers, detergents, plaster, petroleum products and other hazardous materials from
entering the storm water.
CA 20 Solid Waste Management. This BMP describes the requirements to properly
design and maintain trash storage areas. The primary design feature requires the
storage of trash in covered areas.
CA 21 Hazardous Waste Management. This BMP describes the requirements to
properly design and maintain waste areas.
CA 23 Concrete Waste Management. Prevent and reduce pollutant discharge to storm
water from concrete waste by providing onsite and offsite washouts in designated areas
and training employees and consultants regarding their use.
CA 24 Sanitary Septic Water Management. Provide convenient, well- maintained
facilities, and arrange regular service and disposal of sanitary waste.
CA 30 Vehicle and Equipment Cleaning. Use offsite facilities or wash in designated
areas to reduce pollutant discharge into the storm drain facilities.
CA 31 Vehicle and Equipment Fueling. Use offsite facilities or designated onsite
enclosed coverings to reduce pollutant discharge into the storm drain facilities.
CA 32 Vehicle and Equipment Maintenance. Use offsite facilities or designated onsite
enclosed areas with coverings to reduce pollutant discharge into the storm drain
facilities. In addition, run a "dry site" to prevent pollution discharge into storm drains.
CA 40 Employee and Subcontractor Training. Have training sessions for employees and
subcontractors to understand the need for implementation and usage of BMPs and the
need and purpose for keeping the site clean.
ESC 2 Preservation of Existing Vegetation. Minimize the removal of existing trees and
shrubs because they serve as erosion control.
ESC 10 Seeding and Planting. Provide soil stability by planting and seeding grasses,
trees, shrubs, vines, and ground cover.
ESC 11 Mulching. Stabilize cleared or freshly seeded areas with mulch.
ESC 20 Geotextiles and Mats. Natural or synthetics material can be used for soil
stability.
ESC Dust Control. Reduce wind erosion and dust generated by construction activities
by using dust control measures.
ESC 23 Construction Road Stabilization. All onsite vehicle transport routes should be
stabilized immediately after grading and frequently maintained to prevent erosion and
control dust.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Findings.doc 71
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
ESC 24 Stabilized Construction Entrance. Stabilize the construction entrance area to
reduce amount of sediment tracked off the site.
ESC 30 Earth Dikes. Construct earth dikes of compacted soil to divert runoff or channel
water to a desired location.
ESC 31 Temporary Drains and Swales. Use temporary drains and swales to divert
offsite runoff around the construction site, stabilized areas, and direct it into sediment
basins or traps.
ESC 40 Outlet Protection. Use rock or grouted rock at outlet pipes to prevent scouring
of soil caused by high velocities.
ESC 41 Check Dams. Check dams reduce velocities of concentrated flows, thereby
reducing erosion, and promoting sedimentation behind the dams. Check dams are small
and placed across swales and drainage ditches.
ESC 50 Silt Fence. Composed of filter fabric, which have been entrenched, attached to
support poles and sometimes backed by wire fence support. Silt fences promote
sedimentation behind the fence of sediment -laden water.
ESC 51 Straw Bale Barrier. Place straw bales end to end in a level contour in a shallow
trench and stake them in place. The bales will detain runoff and promote sedimentation.
ESC 52 Sand Bag Barriers. By stacking sand bags on a level contour, creates a barrier
to detain sediment -laden water. The barrier will promote sedimentation.
ESC 53 Brush or Rock Filter. Made of 34-inch to three -inch diameter rocks place on a
level contour or composed of brush wrapped in filter cloth and staked to the toe of the
slope will provide a sediment trap.
ESC 54 Storm Drain Inlet Protection. Devises that remove sediment from sediment
laden storm water before entering the storm drain inlet or catch basin.
ESC 55 Sediment Trap. A sediment trap is a small, excavated or bermed area where
runoff for small drainage areas can pass through allowing sediment to settle out.
Potentially Significant Impact Unless Mitigated: Groundwater Quality
Percolation of detention basin discharges to surface water and groundwater could adversely
affect groundwater quality by causing a violation of any water quality standards or waste
discharge requirements, or by substantially degrading water quality.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 72
1I % --)T
00C. ._
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Mitigation Measure
Final Program EIR Section 3.8: Hydrology and Water Quality
6. A combination of grass swales and centrifugal separators or Best Management
Practices of equivalent or superior effectiveness shall be employed with the detention
basins in the project design that demonstrate compliance with all applicable groundwater
quality policies and regulations. Prior to the issuance of a grading permit, calculations
shall be provided to the satisfaction of the City Engineer to demonstrate project
compliance. Devices shall be tested after installation and corrective actions shall be
taken for non - performing devices.
CULTURAL AND PALEONTOLOGICAL RESOURCES
Potentially Significant Impact Unless Mitigated: Prehistoric Archaeological Sites
There are 26 identified archaeological sites within the Specific Plan site; 12 sites have the
potential to be directly or indirectly impacted by Project implementation: CA -VEN -509, -1130, -
1131, -1134, -1135, -1137, -1138, -1140, -1143, -1146, -1148, and -1149. Construction
activities related to the road have the potential to result in adverse impacts to cultural resources,
especially those in site CA -VEN -1584.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
Mitigation Measures
Final Program EIR Section 3.9: Cultural and Paleontological Resources
Prior to all earthmoving activities in the vicinity of archaeological resources (note:
confidential archaeological mapping is on file at the City of Moorpark), the project
applicant shall provide written evidence to the City of Moorpark Community
Development Director or designated representative that a County - certified archaeologist
has been retained, shall be present at the pregrading meeting, shall establish
procedures for archaeological resource surveillance, and shall establish, in cooperation
with the City or landowner, procedures for temporarily halting or redirecting work to
permit the sampling, identification, and evaluation of any artifacts found, as appropriate.
Prior to the issuance of a grading permit, archaeological procedures shall be
incorporated as a note on the grading plan cover sheet. If additional or unexpected
archaeological features are discovered, the archaeologist shall report such findings to
the City of Moorpark Community Development Director or designated representative. If
the archaeological resources are found to be significant, the archaeological observer
shall determine appropriate actions, in cooperation with the City, for exploration and /or
SACommunity Development\DEV PMTS \S P\11 -North Park\Environmenta1\050512 Draft Findings.doc 73
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
salvage. The archaeologist shall submit a follow -up report to the City of Moorpark
Community Development Department, which shall include the period of inspection, an
analysis of any artifacts found, and the present repository of the artifacts. Excavated
finds shall be offered to the County of Ventura and /or designee, on a first refusal basis.
If the artifacts are refused, the landowner may retain said finds if written assurance is
provided that they will be properly preserved in the County, unless said finds are of
special significance, or a museum in the County of Ventura indicates a desire to study
and /or display them at this time, in which case items shall be donated to the City or
designee. If no such assurance is provided by the landowner, the City shall retain the
artifacts and shall be subject to the same stipulations set forth in this mitigation measure
for disposition of artifacts. These actions, as well as final mitigation and disposition of
the resources, shall be subject to the approval of the City of Moorpark Community
Development Director or designated representative.
In accordance with California Health and Safety Code Section 7050.5, if human remains
are found, no further excavation or disturbance of the site or any nearby area reasonably
suspected to overlie adjacent remains shall occur until the County Coroner has
determined the appropriate treatment and disposition of the human remains. The
County Coroner shall make such determination within two working days of notification of
discovery. The County Coroner shall be notified within 24 hours of the discovery. If the
County Coroner determines that the remains are or believed to be Native American, the
County Coroner shall notify the Native American Heritage Commission in Sacramento
within 24 hours. In accordance with California Public Resources Code Section 5097.98,
the Native American Heritage Commission must immediately notify those persons it
believes to be the most likely descended from the deceased Native American. The
descendents shall complete their inspection within 24 hours of notification. The
designated Native American representative would then determine, in consultation with
the property owner, the disposition of the human remains.
2. Prior to tentative tract map approval for tract directly or indirectly affecting archaeological
sites CA -VEN -509, -1130, -1131, -1134, -1135, -1137, -1138, -1140, -1143, -1146,
-1148, and -1149, these archaeological sites shall be mitigated to a less than significant
level. This shall be accomplished through implementation of one of the following
mitigation options:
a. Relocation of grading boundaries /fuel modification zones to completely avoid
disturbance to the site(s). Should the boundary relocation be infeasible, an
archaeological monitor shall be present during grading and fuel modification brush
clearance in the vicinity of archaeological resources (note: confidential
archaeological mapping is on file at the City of Moorpark). Fencing or stakes shall
be erected outside of the sites to visually depict the areas to be avoided during
construction.
Or, if avoidance /preservation is not feasible, then:
b. Prior to grading in the vicinity of archaeological resources (note: confidential
archaeological mapping is on file at the City of Moorpark), Phase III data recovery
(salvage excavations) shall be conducted for these archaeological sites or any other
sites within the potential impact area of development that cannot be avoided. The
Phase III work shall provide sufficient scientific information to fully mitigate the
impacts of development on these sites and be performed in accordance with
standards of the State Office of Historic Preservation.
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental\050512 Draft Findings.doc 74
0(1)0O'D
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
In accordance with California Health and Safety Code Section 7050.5, if human
remains are found, no further excavation or disturbance of the site or any nearby
area reasonably suspected to overlie adjacent remains shall occur until the County
Coroner has determined the appropriate treatment and disposition of the human
remains. The County Coroner shall make such determination within two working
days of notification of discovery. The County Coroner shall be notified within
24 hours of the discovery. If the County Coroner determines that the remains are or
believed to be Native American, the County Coroner shall notify the Native American
Heritage Commission in Sacramento within 24 hours. In accordance with California
Public Resources Code Section 5097.98, the Native American Heritage Commission
must immediately notify those persons it believes to be the most likely descended
from the deceased Native American. The descendents shall complete their
inspection within 24 hours of notification. The designated Native American
representative would then determine, in consultation with the property owner, the
disposition of the human remains.
3. Prior to the issuance of a grading permit for the roadway alignment associated with the
proposed Moorpark College SR -118 interchange associated with the North Park Specific
Plan project, a County- certified archaeologist shall be retained by the City of Moorpark,
at the expense of the project applicant, to perform a Phase II subsurface test -level
investigation and surface collection for CA -VEN -1584. The test -level report evaluating
the site shall include a discussion of the site's significance (depth, nature, condition, and
extent of the resources), and final mitigation recommendations and cost estimates, if
required to fully mitigate significant impacts. Should the Phase II subsurface test -level
investigation and surface collection determine the potential presence of significant
subsurface resources, CA -VE -1584 shall be mitigated to a less than significant level
through the implementation of one of the following mitigation options:
a. Relocation of grading boundaries /fuel modification zones to completely avoid
disturbance to the site(s). Should the boundary relocation be infeasible, an
archaeological monitor shall be present during grading and fuel modification brush
clearance in the vicinity of archaeological resources (note: confidential
archaeological mapping is on file at the City of Moorpark). Fencing or stakes shall
be erected outside of the sites to visually depict the areas to be avoided during
construction.
Or, if avoidance /preservation is not feasible, then:
b. Prior to grading in the vicinity of archaeological resources (note: confidential
archaeological mapping is on file at the City of Moorpark), Phase III data recovery
(salvage excavations) shall be conducted for these archaeological sites or any other
sites within the potential impact area of development that cannot be avoided. The
Phase III work shall provide sufficient scientific information to fully mitigate the
impacts of development on these sites and be performed in accordance with
standards of the State Office of Historic Preservation.
Excavated finds shall be offered to the County of Ventura, or designee, on a first refusal
basis. If the artifacts are refused, the landowner may retain said finds if written
assurance is provided that they will be properly preserved in the County of Ventura,
unless said finds are of special significance, or a museum in the County of Ventura
indicates a desire to study and /or display them at this time, in which case items shall be
donated to the City or designee. If no such assurance is provided by the landowner, the
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 75
000 iJ�'V
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
City shall retain the artifacts and shall be subject to the same stipulations set forth in this
mitigation measure for disposition of artifacts. Final mitigation shall be carried out based
upon the report recommendations and a determination as to the site's disposition by the
City of Moorpark Community Development Department based on the recommendations
of a County- certified archaeologist. Possible determinations include, but are not limited
to, preservation, salvage, partial salvage, or no mitigation necessary.
In accordance with California Health and Safety Code Section 7050.5, if human remains
are found, no further excavation or disturbance of the site or any nearby area reasonably
suspected to overlie adjacent remains shall occur until the County Coroner has
determined the appropriate treatment and disposition of the human remains. The
County Coroner shall make such determination within two working days of notification of
discovery. The County Coroner shall be notified within 24 hours of the discovery. If the
County Coroner determines that the remains are or believed to be Native American, the
County Coroner shall notify the Native American Heritage Commission in Sacramento
within 24 hours. In accordance with California Public Resources Code Section 5097.98,
the Native American Heritage Commission must immediately notify those persons it
believes to be the most likely descended from the deceased Native American. The
descendents shall complete their inspection within 24 hours of notification. The
designated Native American representative would then determine, in consultation with
the property owner, the disposition of the human remains.
4. In order to reduce indirect impacts from increased human presence on preserved
archaeological sites outside of the development area, a program to limit human access
shall be implemented prior to occupancy of residential units anywhere on the Specific
Plan site. The plan shall be developed and implemented by the project applicant and
approved by a County- certified archaeologist familiar with the resources present at the
Specific Plan site. The plan shall include one or more of the following:
a. Fencing and /or other access - restriction methods around archaeologically sensitive
areas of the Specific Plan site to inhibit human access, or
b. Planting of non - invasive plant species with thorns or other characteristics in areas
close to known resource to discourage human presence, or
c. Capping of known resources, in consultation with a County - certified archaeologist.
Potentially Significant Impact Unless Mitigated: Paleontological Resources
Implementation of the Project would have a potentially significant impact on paleontological
resources during construction (i.e., brushing, grading, trenching, and other earthmoving
activities) and increased accessibility resulting in unauthorized fossil collecting and removal.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 76
00G,��^�
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
Mitigation Measures
Final Program EIR Section 3.9: Cultural and Paleontological Resources
5. Prior to the approval of gradiR9 plaRG for any subdivision,
development permit, OF GOndltieRal Fuse- peFmit F issuance of the first
grading permit, a soils report shall be submitted to the Community Development Director
for review and approval identifying the types of soils that will be exposed to
grading /disturbance activities. Along with this report, a paleontological mitigation
program plan, outlining procedures for site inspections, paleontological data recovery,
and resource ownership, shall be prepared and submitted to the Community
Development Director for review and approval. The program shall include sufficient
monitoring of the potential fossil - bearing areas of the site during grading operations with
procedures for resource recovery to ensure that paleontological resources are not lost
during grading operations. Paleontological resource requirements shall be incorporated
as a note on the grading plan cover sheet. For most grading activities, a qualified
paleontologist shall be retained by the property owner or the City of Moorpark, at the
expense of the project applicant, to monitor, and, if necessary, salvage scientifically
significant fossil remains during grading operations. The duration of these inspections
shall be determined by the paleontologist and shall depend on the sensitivity of the rock
units, the rate of excavation, and the abundance of fossils. The duration shall be
determined by:
a. Grading activities in geologic units of high paleontological sensitivity shall require full -
time monitoring by a qualified paleontologist.
b. Geologic units of low or moderate paleontological sensitivity shall require part-time
monitoring. If significant fossils are observed during grading, full -time monitoring
shall be implemented.
c. The paleontologists shall have the power to temporarily divert or direct grading
efforts to allow for evaluation and any necessary salvage of exposed fossils.
d. Monitoring may be reduced if the potentially fossiliferous units described in this
assessment are not present subsurface or, if present, are determined upon exposure
and examination by qualified paleontological personnel to have low potential to
contain fossil resources.
6. During paleontological studies, matrix samples for microvertebrates shall be collected
and processed. Recovered specimens shall be prepared to a point of identification and
permanent preservation, including washing sediments to recover small vertebrates or
invertebrates, and curated in a qualified museum repository with permanent retrievable
storage. The paleontologist shall have a written repository agreement prior to the
initiation of mitigation activities. These remains shall be donated to an institution with a
research and /or educational interest in the materials such as the Los Angeles County
Museum of Natural History.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 77
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
7. Prior to the conclusion of grading activities for any subdivision, a final report
summarizing findings, including an itemized inventory and contextual stratigraphic data,
shall accompany the fossils to the designated repository with an additional copy sent to
the City of Moorpark Community Development Director or designated representative.
Locations of recorded fossil deposits shall remain confidential and shall be disclosed
only on a "need -to- know" basis. The report and inventory, when submitted, would
signify completion of the program to mitigate impacts to paleontological resources for
that subdivision.
PUBLIC SERVICES AND UTILITIES
Potentially Significant Impact Unless Mitigated: High Fire Hazard Area and Increased
Demand for Fire Protection Services
The Specific Plan site is located in a high fire hazard area. The Project would introduce people
into previously undeveloped areas and trails would extend through the northern portion of the
site. As a result, the potential for human - induced fires would increase, resulting in a significant
impact.
The estimated response time to the Specific Plan site would exceed the VCFPD response goal,
resulting in a significant impact.
The Project would cumulative contribute to the need for additional fire protection service. With
implementation of an additional fire station on or within the vicinity of the Specific Plan site, no
significant cumulative impacts are anticipated.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features, standard conditions and requirements, and adoption of the
following mitigation measures as identified in the Final Program EIR.
Project Design Features
Final Program EIR Section 3.10: Public Services and Utilities
• A minimum 200 - foot -wide fuel modification zone from the buildable pad along the
northern portion of the site contiguous to the Nature Preserve.
The fire station site identified in the approved Specific Plan will be offered for dedication
to the Ventura County Fire Protection District (VCFPD). If the VCFPD determines that
another site within the boundaries of the Specific Plan site or outside of the Specific Plan
site is preferable, an alternative site could be offered for dedication upon the consent of
the applicant. The location and development of a fire station would be subject to and
implemented in accordance with an agreement between the VCFPD, the City of
Moorpark, and the project applicant.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 78
U("iC")�)
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
• An emergency services helispot will be provided in the Specific Plan planning area. The
purpose of this facility is to provide a location for firefighting helicopters to land and fill
with water or fuel during emergency operations. It will be constructed in an area
mutually agreed upon by the City of Moorpark, the VCFPD, and the project applicant.
No private or commercial use of the facility would be permitted.
The Development Agreement between the City of Moorpark and the project applicant
identifies the terms through which the Specific Plan project would reimburse the City for
any property tax revenues lost through the property tax agreement with the County of
Ventura associated with and at the time of annexation of the site to the City. These
revenues would be available to the City of Moorpark for city services related to the
project.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities
• The project applicant shall pay to the City of Moorpark capital improvement,
development, and processing fees at the rate and amount in effect at the time the fee is
required to be paid. Said fees shall include but not be limited to Library Facilities Fees,
Police Facilities Fees, Fire Facilities Fees, entitlement processing fees, and plan check
and permit fees for buildings and public improvements.
All structures adjacent to open space shall be designed to satisfy at least a one -hour
fire - resistant rating. Such structures shall incorporate fire retardant features such as
boxed -in eaves, reduced overhangs, double paned windows, convection resistant roof
design, non - combustible roofing material, and related design features, as set forth in the
City of Moorpark Building Code. Building permits shall not be issued until review of fire
retarding architectural features has been completed by the City of Moorpark Building
Department. Design standards meeting City of Moorpark Building Department criteria
shall be included in the Fire Hazard Reduction Program and incorporated into the Fire
Hazard Reduction Design Guidelines for the residential units.
During all grading and site clearance activities, all earthmoving equipment shall be
equipped with spark arrestors and at least two portable fire extinguishers per vehicle. All
equipment used in the vegetation clearance phase shall be equipped with spark
arrestors and best available fire safety technology. The vegetation clearance activities
shall be coordinated with and approved by the VCFPD.
• Prior to the issuance of building permits, the applicant shall be required to comply with
all VCFPD design requirements regarding hydrant locations, fire ratings for building
materials, fuel modification requirements, fee payments for pro -rata cumulative impacts
and other standard fire safety requirements.
Mitigation Measures
Final Program EIR Section 3.10: Public Services and Utilities —Fire Protection
1. Prior to approval of the first final map, the project applicant shall enter into an agreement
with the Ventura County Fire Protection District (VCFPD) and City of Moorpark
establishing the timing and funding for the provision of fire protection facility(ies) and
infrastructure requirements of the Specific Plan project.
SACommunity Development\DEV PMTS \S P \11 -North ParMEnvironmenta1\050512 Draft Findings.doc 79
(� <? e !;"."�
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
2. Prior to the approval of the first final map, the project applicant shall retain a certified fire
management professional to prepare a Fire Hazard Reduction Program; this program
shall be prepared in consultation with the VCFPD and the project biologist with expertise
in native plants, and shall be approved by the City of Moorpark Community Development
Director. Said program will be developed by the project applicant, but shall be
maintained by an entity(ies), such as a homeowners' association, assessment district, or
similar entity, that can assure adequate fire hazard reduction management throughout
the lifetime of the project. The program shall apply to all lands within 200 feet of the
residences (or as amended by the certified fire professional based on fuel modification
factors acceptable to the VCFPD. The program shall include, at a minimum, a
vegetation management program focusing on the continued management of highly
combustible vegetation while allowing for the retention of oak trees, providing defensible
space, and the control of invasive non - native species. One component of the program
shall be the permanent establishment of fuel modification zones to the standards of the
VCFPD for all structures adjacent to open space areas with native vegetation.
Residential building pads shall be set back a minimum 100 feet from any protected
biological resource. The fuel modification zone shall be designed by and planted under
the supervision of a landscape architect with expertise in native plant materials and
habitat restoration. Native and non - native low -fuel vegetation materials shall be
provided as replacement vegetation. The program shall include specific guidelines as to
the frequency of maintenance (e.g., weed abatement), allowable species for planting,
responsibility of clearing public and private zones, and irrigation requirements or
restrictions. The timing and funding for the provision of the vegetation management
program would be subject to and implemented in accordance with an agreement with the
VCFPD.
Potentially Significant Impact Unless Mitigated: Minor Crime Activity During Project
Construction
Construction Activities: During construction, the Project could cause a temporary rise in minor
crimes, such as trespassing, vandalism, and petty theft, which is considered a short-term
significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measures
Final Program EIR Section 3.10: Public Services and Utilities — Police Protection
Prior to the initiation of grading, a construction security service shall be established at
the construction site along with other measures, as identified by the Moorpark Police
Department and the Community Development Department, to be instituted during the
grading and construction phase.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 80
0 1130v ✓J
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Potentially Significant Impact Unless Mitigated: Increased Demand for Law Enforcement
Services
Due to the size of the Specific Plan site, the average response time is anticipated to increase.
Residential and non - residential uses would result in an increase in calls, increased demand for
services and require additional police staffing and /or equipment in order to maintain adequate
service levels throughout the City. The Project's incremental demand for services would require
additional police staffing and /or equipment in order to maintain adequate service levels
throughout the City.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and standard conditions and requirements as identified in
the Final Program EIR.
Project Design Features
Final Program EIR Section 3.10: Public Services and Utilities — Police Protection
The Development Agreement between the City of Moorpark and the project applicant
identifies the terms through which the Specific Plan project would reimburse the City for
any property tax revenues lost through the property tax agreement with the County of
Ventura associated with and at the time of annexation of the site to the City. These
revenues would be available to the City of Moorpark for city services related to the
project.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities — Police Protection
• The applicant shall pay to the City of Moorpark capital improvement, development, and
processing fees at the rate and amount in effect at the time the fees are required to be
paid. Said fees shall include but not be limited to Library Facilities Fees, Police Facilities
Fees, Fire Facilities Fees, entitlement processing fees, and plan check and permit fees
for buildings and public improvements.
• Prior to issuance of building permits, the Police Department shall review development
plans for the incorporation of defensible space concepts to reduce demands on police
services. To the degree feasible, public safety planning recommendations shall be
incorporated into the project plans. The applicant shall prepare of list of project features
and design components that demonstrate responsiveness to defensible space design
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 81
0 ll 1 FSr?+t "
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
concepts. Review and approval by the Police Department of all defensible space design
features incorporated into the project shall occur prior to initiation of the building plan
check process.
Less Than Significant Impact: Increased Demand for Potable Water Service
Although no significant impacts have been identified, the project applicant will be required to
comply with standard conditions and requirements.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of standard conditions and requirements as identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities — Potable Water
• The applicant shall comply with all pertinent County of Ventura Public Works Department
water and sewer connection regulations implemented by the County of Ventura Public
Works Department Waterworks District No. 1.
Prior to Final Map recordation of any phase, the City of Moorpark, Calleguas Municipal
Water District, and Ventura County Waterworks District No. 1 shall approve final plans
for water distribution. The applicant shall either construct the required distribution
facilities or enter into an agreement with the Calleguas Municipal Water District and /or
Waterworks District No.1 stating when and how facilities will be funded and
constructed. The system shall be designed and constructed to meet the requirements
of the proposed land uses and applicable City of Moorpark, Calleguas Municipal Water
District, and Waterworks District No.1 standards.
Less Than Significant Impact: Recycled Water Service
Although no significant impacts have been identified, the project applicant will be required to
comply with standard conditions and requirements.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and standard conditions and requirements as identified in
the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 82
11 �'i.i 4i ✓ �
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Project Design Features
Final Program EIR Section 3.10: Public Services and Utilities — Recycled Water
A recycled water system for the Specific Plan site shall be provided for irrigation
purposes to ensure recycled water is available for irrigation of roadway landscaping,
parks, public facilities, and other pertinent uses as a part of Phases B and C.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities — Recycled Water
• The applicant shall comply with all pertinent County of Ventura Public Works Department
water and sewer connection regulations implemented by the County of Ventura Public
Works Department Waterworks District No. 1.
Less Than Significant Impact: Wastewater
Although no significant impacts have been identified, the project applicant will be required to
comply with standard conditions and requirements.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of standard conditions and requirements as identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities — Wastewater
• The applicant shall comply with all pertinent County of Ventura Public Works Department
water and sewer connection regulations implemented by the County of Ventura Public
Works Department Waterworks District No. 1.
• The applicant shall be responsible for the construction of all onsite and offsite sanitary
sewer faculties and connections required to serve the project. The applicant shall enter
into an agreement with Ventura County Waterworks District No. 1 to construct the
improvements and the system shall be dedicated to Waterworks District No. 1 for
maintenance.
Less Than Significant Impact: Solid Waste Disposal
Although no significant impacts have been identified, the project applicant will be required to
comply with County and state mandated requirements for the reduction of solid waste.
SACommunity Development \DEV PMTS\S P \11 -North Park \Environmenta1\050512 Draft Findings.doc 83
to %
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and standard conditions and requirements as identified in
the Final Program EIR.
Project Desiqn Features
Final Program EIR Section 3.10: Public Services and Utilities -Solid Waste Disposal
• Where feasible, use recycled building materials (such as fences, wheel block, benches,
roofing, and siding materials) in commercial and public facilities buildings.
Provide educational materials to each new resident and to schools demonstrating
recycling and composting of landscape materials. Grass recycling, portable chipping,
onsite composting, and reuse of trimmings, drip irrigation systems, and use of efficient
fertilizers and other landscape components.
• Construct residential units with built -in recycling and trash separation areas.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities -Solid Waste Disposal
Prior to approval of the final map, a Solid Waste Management Plan shall be prepared
and submitted to the City's Community Services Department Analyst responsible for
Solid Waste Management Programs for review and approval. This plan, which shall
include specific measures to reduce the amount of refuse generated by construction of
the proposed project, shall be developed in consultation with the City of Moorpark
Community Services Department to meet waste reduction requirements established by
the California Integrated Waste Management Act of 1989.
Less Than Significant Impact: Energy -Gas and Electricity
Although no significant impacts have been identified, the project applicant will be required to
comply with standard conditions and requirements.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 84
013 0 %J
AF
I
Facts in Support of Finding
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of the following mitigation measure as identified in the Final Program EIR.
Mitigation Measure
Final Program EIR Section 3.10: Public Services and Utilities- Energy
3. Prior to the issuance of the first building permit, the applicant shall demonstrate to the
City of Moorpark that all North Park Specific Plan structures have been designed and
shall be constructed to be at least 20 percent more energy efficient than required by the
energy efficiency standards of the State Building Code, Title 24, California Code of
Regulations, Part 6- California Energy Efficiency Standards for Residential and
Nonresidential Buildings).
Potentially Significant Impact Unless Mitigated: Increased Demand on Schools
Implementation of the Specific Plan Project would significantly impact school facilities through
the generation of 1,155 students.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and standard conditions and requirements as identified in
the Final Program EIR.
Project Desiqn Features
Final Program EIR Section 3.10: Public Services and Utilities - Schools
An 18 -acre elementary school site shall be conveyed to the Moorpark Unified School
District as a part of Phase A of the Specific Plan project.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities - Schools
• The project applicant shall pay school fees to the Moorpark Unified School District
pursuant to the requirements established in California Government Code Section 65995.
The amount of fees to be paid will be determined based on the established State formula
for determining construction costs. Applicable fees shall be paid prior to the issuance of
each building permit. The mitigation provided by the applicant may exceed the
requirements established in California Government Code Section 65995 through the
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 85
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
provisions of a mitigation agreement between the applicant and the Moorpark Unified
School District.
PUBLIC HEALTH AND SAFETY
Potentially Significant Impact Unless Mitigated: Potential Presence of Hazardous
Materials
Accumulations of miscellaneous debris scattered in the eastern portion of the site in the Oak
Park Oil Field area may include hazardous materials that may require appropriate disposal.
Bullet casings from the shooting range may have resulted in lead in the shallow soils, creating a
potentially significant impact. Potential exposure to asbestos or lead during demolition activities
on the Project site would be a significant impact.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of standard conditions and requirements and adoption of the following mitigation
measures as identified in the Final Program EIR.
Standard Conditions and Requirements
Final Program EIR Section 3.11: Public Health and Safety
Prior to the issuance of the first grading permit, the developer shall indicate in writing to
the City of Moorpark, the disposition of any oil or groundwater wells that may exist within
the project site boundaries. If any wells are designated for abandonment, or if future
construction of any structure over or proximate to previously abandoned wells could
result in a hazard to health or the environment (Cal. Pub. Res. Code §3208.1), such
wells must be abandoned or re- abandoned pursuant to requirements set forth in Ventura
County Ordinance Nos. 2372 or 3991, and applicable regulations of the California
Division of Oil, Gas, and Geothermal Resources (DOGGR).
Prior to the issuance of the first grading permit, the applicant shall have prepared and
submitted for review and approval by the City of Moorpark, the necessary investigation,
including a "Phase II" investigation, to determine if the prior operation of all active and
abandoned onsite oil wells and pipelines caused any contamination of the subsurface
soil or groundwater. A work plan for this investigation must be approved by the City prior
to its initiation. The Phase If investigation shall include a soil sampling and soil gas
sampling program to identify any potential contamination, including contamination due to
any unmapped pipelines, sumps, or disposal areas. If such contamination is discovered,
the applicant shall comply with all applicable laws, rules, and regulations concerning the
reporting, analysis, and, if necessary, remediation of any such contamination, which
laws and regulatory requirements are based on the extent and nature of any
contamination discovered. The applicant shall comply with the above laws and
regulations concerning the abandonment of the oil wells and any necessary remediation
SACommunity Development\DEV PMTS\S P \11 -North Park \Environmental \050512 Draft Findings.doc 86
W.r- 0 _4L
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
of any surface and subsurface contamination with respect to property that it owns in the
Specific Plan area (including the Specific Plan area and the area for the access road and
freeway interchange that is outside the Specific Plan area) and, if feasible and
necessary to satisfy the conditions of project approval, with respect to any property in
the development area that the developer does not own.
• If any hazardous waste is encountered during the construction of this project, all work in
the immediate vicinity of hazardous waste shall be immediately stopped and the Ventura
County Environmental Health Department, the Fire Department, the Sheriffs
Department, and the City Construction Observer shall be notified immediately. Work
shall not proceed until clearance has been issued by all of these agencies.
A site health and safety plan, which meets California Occupational Safety and Health
Administration (Cal /OSHA) requirements, shall be prepared and in place prior to
commencing work on any contaminated sites. The applicant, through its contractor,
shall ensure proper implementation of the health and safety plan.
• Demolition activities involving asbestos materials are subject to the National Emissions
Standards for Hazardous Air Pollutants (NESHAP) regulations as listed in the Code of
Federal Regulations (40 CFR Park 61, Subpart M). These regulations require an
inspection or survey of the site that is to be demolished to determine whether asbestos
materials are present. Demolition activities are also subject to Ventura County Air
Pollution Control District (VCAPCD) Rule 62.7, Asbestos, Demolition and Renovation.
Compliance with VCAPCD Rule 62.7 is adequate to ensure that all asbestos
entrainment will not cause a significant adverse impact (source: Ventura County Air
Quality Assessment Guidelines, November 2000).
Mitigation Measures
Final Program EIR Section 3.11: Public Health and Safety
1. Any significant soil staining associated with oil operations on the project site shall be
mitigated prior to the issuance of the first grading permit as follows: soils that contain
total petroleum hydrocarbons (TPH) in concentrations below the action level may be left
in place, provided that the soils do not contain other hazardous materials. The Ventura
County Environmental Health Department (VCEHD) shall be contacted regarding
regulations on clean -up levels for naturally- occurring crude oil. All areas where oil wells,
pipelines, or other activities where crude oil may have spilled within the project site,
including the area for the access road and freeway interchange shall be evaluated and
all contaminated soils shall be treated or disposed of in accordance with all applicable
regulatory guidelines under the VCEHD's Voluntary Cleanup Program and any other
applicable regulations.
2. All sumps and spill containment areas located within the Specific Plan development area
shall be identified and sampled to determine the types and concentrations of the
contaminants present, if any. If contaminants are encountered, the vertical and lateral
extent of contamination shall be assessed before a remediation alternative can be
selected. Soils stained only with crude oil and containing total petroleum hydrocarbons
(TPH) in concentrations below the action level established by the local lead regulatory
agency may be left in place or used as fill materials. Offsite disposal may be required for
soils contaminated with heavy metals, solvents, or other substances.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental\050512 Draft Findings.doc 87
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
3. The presence of an active oil field, including oil wells, sumps, and associated tanks,
suggests that methane may be present in soil vapor beneath the site. Because grading
can affect methane concentrations, a comprehensive methane gas assessment shall be
completed post - grading in these areas to determine if, and the extent to which, methane
mitigation measures (vapor barriers, active or passive venting, etc.) would be required
prior to or during construction. Measures shall be implemented, if required, based on
methane concentrations, if detected, based on regulatory requirements.
4. Natural oil seep areas shall be avoided, if feasible, during grading operations to minimize
the spread of the related petroleum hydrocarbons into the surrounding soil.
5. To determine the nature and extent of potential lead contamination in the soils around
the area of the shooting range, limited baseline sampling of the shallow soils and
analysis for lead prior to the start of grading operations shall be performed. If
contamination is present, the soil shall be removed and transported to an appropriate
waste disposal facility, in accordance with current regulatory guidelines.
6. In the event unidentified, obvious, or suspected hazardous materials, contamination,
underground tanks, or other features or materials that could present a threat to human
health or the environment are discovered during construction, such activities shall cease
immediately until evaluated by a qualified professional. Work shall not continue until
appropriate actions recommended by the professional have been implemented to
demonstrate that contaminant concentrations do not exceed risk -based criteria.
Potentially Significant Impact Unless Mitigated: High Fire Hazard Area
Because the Specific Plan site is located in a high fire hazard area, the Project could have a
significant fire hazard impacts on the surrounding area.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
inclusion of project design features and standard conditions and requirements and the adoption
of the following mitigation measures as identified in the Final Program EIR.
Project Design Features
Final Program EIR Section 3.10: Public Services and Utilities —Fire Protection
• A minimum 200 - foot -wide fuel modification zone from the buildable pad along the
northern portion of the site contiguous to the Nature Preserve.
• The fire station site identified in the approved Specific Plan will be offered for dedication
to the Ventura County Fire Protection District (VCFPD). If the VCFPD determines that
another site within the boundaries of the Specific Plan site or outside of the Specific Plan
site is preferable, an alternative site could be offered for dedication upon the consent of
SACommunity Development \DEV PMTS \S P \11 -North Park\Environmental \050512 Draft Findings.doc 88
A
t��� y ;3
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
the applicant. The location and development of a fire station would be subject to and
implemented in accordance with an agreement between the VCFPD, the City of
Moorpark, and the project applicant.
• An emergency services helispot will be provided in the Specific Plan planning area. The
purpose of this facility is to provide a location for firefighting helicopters to land and fill
with water or fuel during emergency operations. It will be constructed in an area
mutually agreed upon by the City of Moorpark, the VCFPD, and the project applicant.
No private or commercial use of the facility would be permitted.
The Development Agreement between the City of Moorpark and the project applicant
identifies the terms through which the Specific Plan project would reimburse the City for
any property tax revenues lost through the property tax agreement with the County of
Ventura associated with and at the time of annexation of the site to the city. These
revenues would be available to the City of Moorpark for city services related to the
project.
Standard Conditions and Requirements
Final Program EIR Section 3.10: Public Services and Utilities —Fire Protection
• The project applicant shall pay to the City of Moorpark capital improvement,
development, and processing fees at the rate and amount in effect at the time the fee is
required to be paid. Said fees shall include but not be limited to Library Facilities Fees,
Police Facilities Fees, Fire Facilities Fees, entitlement processing fees, and plan check
and permit fees for buildings and public improvements.
• All structures adjacent to open space shall be designed to satisfy at least a one -hour
fire - resistant rating. Such structures shall incorporate fire retardant features such as
boxed -in eaves, reduced overhangs, double paned windows, convection resistant roof
design, non - combustible roofing material, and related design features, as set forth in the
City of Moorpark Building Code. Building permits shall not be issued until review of fire
retarding architectural features has been completed by the City of Moorpark Building
Department. Design standards meeting City of Moorpark Building Department criteria
shall be included in the Fire Hazard Reduction Program and incorporated into the Fire
Hazard Reduction Design Guidelines for the residential units.
• During all grading and site clearance activities, all earthmoving equipment shall be
equipped with spark arrestors and at least two portable fire extinguishers per vehicle. All
equipment used in the vegetation clearance phase shall be equipped with spark
arrestors and best available fire safety technology. The vegetation clearance activities
shall be coordinated with and approved by the Ventura County Fire Protection District.
• Prior to the issuance of building permits, the applicant shall be required to comply with
all Ventura County Fire Protection District design requirements regarding hydrant
locations, fire ratings for building materials, fuel modification requirements, fee payments
for pro -rata cumulative impacts and other standard fire safety requirements.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental\050512 Draft Findings.doc 89
0 C :.
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Mitigation Measures
Final Program EIR Section 3.10: Public Services and Utilities —Fire Protection
1. Prior to approval of the first final map, the project applicant shall enter into an agreement
with the Ventura County Fire Protection District (VCFPD) and City of Moorpark
establishing the timing and funding for the provision of fire protection facility(ies) and
infrastructure requirements of the Specific Plan project.
3. Prior to the approval of the first final map, the project applicant shall retain a certified fire
management professional to prepare a Fire Hazard Reduction Program; this program
shall be prepared in consultation with the VCFPD and the project biologist with expertise
in native plants, and shall be approved by the City of Moorpark Community Development
Director. Said program will be developed by the project applicant, but shall be
maintained by an entity(ies), such as a homeowners' association, assessment district, or
similar entity, that can assure adequate fire hazard reduction management throughout
the lifetime of the project. The program shall apply to all lands within 200 feet of the
residences (or as amended by the certified fire professional based on fuel modification
factors acceptable to the VCFPD. The program shall include, at a minimum, a
vegetation management program focusing on the continued management of highly
combustible vegetation while allowing for the retention of oak trees, providing defensible
space, and the control of invasive non - native species. One component of the program
shall be the permanent establishment of fuel modification zones to the standards of the
VCFPD for all structures adjacent to open space areas with native vegetation.
Residential building pads shall be set back a minimum 100 feet from any protected
biological resource. The fuel modification zone shall be designed by and planted under
the supervision of a landscape architect with expertise in native plant materials and
habitat restoration. Native and non - native low -fuel vegetation materials shall be
provided as replacement vegetation. The program shall include specific guidelines as to
the frequency of maintenance (e.g., weed abatement), allowable species for planting,
responsibility of clearing public and private zones, and irrigation requirements or
restrictions. The timing and funding for the provision of the vegetation management
program would be subject to and implemented in accordance with an agreement with the
VCFPD.
Potentially Significant Impact Unless Mitigated: San Joaquin Valley Fever
Activities for the Project would expose construction workers and others to San Joaquin Valley
Fever spores, if present in soil within the Project area.
Finding
Consistent with CEQA, Public Resources Code Section 21081, changes or alterations have
been required in, or incorporated into, the Project, which mitigate or avoid the significant
environmental effects on the environment as identified in the Final Program EIR.
Facts in Support of Finding
The significant effect has been avoided or mitigated to a level that is less than significant by
adoption of the following mitigation measures as identified in the Final Program EIR.
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 90
0A �T-
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Mitigation Measures
Final Program EIR Section 3.11: Public Health and Safety
7. Work crews shall use respirators during project clearing, grading, and excavation
operations, in accordance with California Division of Occupational Safety and Health
regulations.
8. The cabs of grading and construction equipment shall be air - conditioned.
9. Construction roads shall be paved, when possible, to reduce fugitive dust and potential
exposure to the fungus attributable to San Joaquin Valley Fever; or the access road into
the project site shall be paved or treated with environmentally -safe dust control agents.
10. Where acceptable to the Ventura County Fire Protection District, weed growth shall be
controlled by mowing instead of discing, thereby leaving the ground undisturbed; a
mulch covering shall also be used when possible.
5.0 FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR IMPACTS THAT CANNOT BE
MITIGATED TO A LEVEL CONSIDERED LESS THAN SIGNIFICANT
The purpose of this section is to present the findings, and facts in support thereof, concerning
those Project - related impacts that, despite the implementation of project design features, standard
conditions and requirements, and mitigation measures, cannot be reduced to a level considered
less than significant. The following sets forth all significant effects of the Alternative A Project
that remain significant and unavoidable after mitigation.
LAND USE AND RELATED PLANNING PROGRAMS
Unavoidable Significant Impact: Loss of Farmland of Local Importance and Grazing Land
Project implementation (Phase A and Buildout) would result in the loss of all onsite Farmland of
Local Importance (approximately 167 acres) as designated by the California Department of
Conservation Farmland Mapping and Monitoring Program. Farmland of Local Importance is
located in the central portion of the Specific Plan site. As a result of countywide and statewide
losses of farmland and grazing lands, the Project's contribution to this loss is significant on a
Project- specific and cumulative basis. Avoidance of Farmland of Local Importance is not
considered feasible; therefore, the loss of this resource is a significant, unavoidable impact.
Approximately 3,403 acres of the Property are designated as Grazing Land under the Farmland
Mapping and Monitoring Program. At Buildout, the Project would displace all existing
agricultural use (grazing) through the development of the site with urban land uses. Cattle
grazing would not be permitted in the Nature Preserve because of its adverse impacts on
biological resources. Therefore, the termination of agricultural use (grazing) of the site is a
significant unavoidable impact.
Finding
Specific economic, legal, technological, or other considerations, including the provision of
employment opportunities for highly trained workers, make infeasible the Project alternatives
identified in the Final Program EIR that would reduce this impact to a less -than significant level.
SACommunity Development\DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 91
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Facts in Support of Finding
The significant effect cannot be reduced to a level less than significant as there is no feasible
project- specific mitigation available. The unavoidable effect is considered acceptable when
balanced against the facts set forth in the Statement of Overriding Considerations.
AESTHETICS AND VISUAL RESOURCES
Unavoidable Significant Impact: Changes to Visual Character of Site
The Project would significantly alter the landscape visible in visual simulations 1 and 2. Existing
vacant land in the southern /central viewshed area would be developed with residential,
commercial, institutional, recreational, and open space uses that would be visible. Specific Plan
implementation would have a significant impact to this viewshed.
On a cumulative level, changes to the visual character of the site shown in visual simulations 1,
2, and 3 would be considered significant, cumulative impacts.
Existing views of the site from the northern trail system would be significantly impacted by
Specific Plan site development.
Findings
Changes or alterations have been required in, or incorporated into, the Project which
substantially lessened the significant environmental effect as identified in the Final Program
EIR. Specific economic, legal, technological, or other considerations, including the provision of
employment opportunities for highly trained workers, make infeasible the Project alternatives
identified in the Final Program EIR that would reduce this impact to a less -than significant level.
Facts in Support of Finding
The significant effect has been substantially lessened but cannot be reduced to a level less than
significant by inclusion of project design features, standard conditions and requirements, and
adoption of the following mitigation measures as identified in the Final Program EIR. The
unavoidable effect is considered acceptable when balanced against the facts set forth in the
Statement of Overriding Considerations.
Proiect Design Features
Final Program EIR Section 3.2: Aesthetics and Visual Resources
• To the extent allowable by other agencies, all infrastructure shall be placed below grade
to avoid visually prominent facilities.
• The North Park Specific Plan includes a 2,123 -acre Nature Preserve.
• No new oil exploration or drilling would be permitted in development areas on the
Specific Plan site. Existing wells in development areas will be capped.
Standard Conditions and Requirements
Final Program EIR Section 3.2: Aesthetics and Visual Resources
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental\050512 Draft Findings.doc 92
04 CIA
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
• The Community Development Director and City Engineer shall review and approve the
project's conformance with contour grading concept design consistent with
recommendations in the City's Hillside Management Ordinance and City Council
Resolution No. 2000 -1874. Grading permits shall not be issued until 40 -scale grading
plans have been developed that incorporate contour grading techniques. The project
shall be constructed in accord with approved grading plans.
Prior to the issuance of a Zoning Clearance for grading, the applicant shall submit a
complete Landscape Plan, together with specifications and a separate Maintenance
Plan. The Landscape Plan shall encompass all areas required to be planted consistent
with the conditions of approval and the adopted Mitigation Monitoring and Reporting
Program and shall incorporate the recommendations of the biological resources
mitigation program and Fire Hazard Reduction Program. The Landscape Plan shall be
reviewed by the City of Moorpark Landscape Architect consultant and approved by the
Community Development Director prior to Zoning Clearance for grading permit, or first
Final Map approval, whichever occurs first.
Mitigation Measures
Final Program EIR Section 3.2: Aesthetics and Visual Resources
Prior to the approval of any final tract maps, a detailed landscape plan shall be reviewed
and approved by the City of Moorpark Community Development Department. The plan
shall be prepared and certified by a restoration ecologist or licensed landscape architect
with expertise in native plant materials and habitat restoration, and shall comply with
Community Development standard plans, adopted planned community regulations, and
Standard Conditions of Approval.
2. All concrete structures, such as drainage ditches, detention basins, rip -rap, crib walls,
swales, or curbs, located in natural areas shall be constructed with colored concrete to
blend with the surrounding terrain.
3. Above -grade infrastructure such as water tanks, water lines, etc. shall be painted with a
color approved by the City of Moorpark Community Development Department and the
County of Ventura Water and Sanitation Services Division so as to blend in with
surrounding terrain. Landscaped berms shall be provided around the tanks to further
screen the view of the tanks from surrounding areas, as determined necessary by the
Community Development Director.
Final Program EIR Section 3.6: Biological Resources
4. A total of 534 trees will be impacted by Phase A and an additional 175 trees by Buildout.
The project shall be designed to avoid trees to the greatest extent practicable. If this
impact cannot be avoided, an inventory of oak trees on the proposed development site
shall be updated by an arborist approved by the City of Moorpark Community
Development Director prior to the removal of oak trees on the Specific Plan site. The
inventory shall record the location and size of individual oak and walnut trees that are
9.5 inches diameter at breast height (dbh) or larger including dead or dying trees on the
proposed development site. The inventory shall also include the dbh, height, canopy
SACommunity Development\DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc /p 93
North Park Village and Nature Preserve Specific Plan
Final Program E!R No. 2001 -01
Draft Findinos of Fact
width, aesthetic rating, health rating, number of trunks, and appraisal value of each oak
tree.
Prior to grading, orange snow fencing shall be installed around trees (outside the
dripline) that would not be impacted by construction. Fencing shall be in place and
inspected by the project biologist prior to commencement of grading. This fencing shall
remain in place throughout construction in the vicinity of the fenced trees until the
Community Development Director determines that the fences can be removed without
placing the trees in jeopardy of damage from construction.
As stated in Moorpark Municipal Code 12.12.070 (f), "The Director of Community
Development, or his or her designee, shall cause an appraisal of the value of said trees
to be prepared in accordance with Section 12.12.050C. The resulting value shall be
applied to upgrading the size of tree plantings associated with the project." The
replacement of coast live oak trees shall occur at a minimum 3:1 ratio based on the
appraisal value of the trees as set forth in Municipal Code 12.12.070 (f). Oak trees
relocated into landscape areas of the Specific Plan site shall not count toward meeting
the mitigation obligation of the project.
The Landscape Architect/designer for the projec t
into the Specific Plan site to replace the habita t
shall be reviewed by a qualified biologist and
woodland.
Planting specification shall consider the following:
shall design these replacement trees
of removed woodlands. The habitat
must be comparable to the removed
a. Newly planted trees shall be planted above grade and maintained for five years,
including irrigation, weed control, herbivore protections, and replacement.
b. Amending the backfill soil with wood shavings, oak leaf -mold, etc. is not
recommended when existing soil is high in natural organic matter with a sandy loam
texture, unless recommended by the project biologist.
c. Recommendations for the need of planting amendments and drainage systems shall
be based on soil tests of this project and approved by the City.
d. Any City approved work within the driplines of saved trees, including branch removal,
shall be under the inspection of a qualified arborist.
e. Landscaping requiring irrigation shall not be planted within the dripline of oaks due to
the susceptibility of native oaks to root rot caused by excessive unseasonable
irrigation. The design and installation of landscape irrigation systems outside the
dripline of the oaks shall be such that the area within the dripline is not wetted during
operation of the system. In addition, surface runoff from impermeable surfaces shall
be directed away from oaks; where natural topography has been altered, provisions
should be made for drainage away from trunks of oaks so that water shall not pond
or collect within the dripline of any oak.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc
94
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinqs of Fact
Unavoidable Significant Impact: Topographical /Land Use Changes
The short-term changes to the Specific Plan site related to grading and development of urban
uses would result in significant impacts. Grading activities would result in topographical
changes to the site.
Findings
Changes or alterations have been required in, or incorporated into, the Project which
substantially lessened the significant environmental effect as identified in the Final Program
EIR. Specific economic, legal, technological, or other considerations, including the provision of
employment opportunities for highly trained workers, make infeasible the Project alternatives
identified in the Final Program EIR that would reduce this impact to a less -than significant level.
Facts in Support of Finding
The significant effect has been substantially lessened but cannot be reduced to a level less than
significant by inclusion of standard conditions and requirements and adoption of the following
mitigation measures as identified in the Final Program EIR. The unavoidable effect is
considered acceptable when balanced against the facts set forth in the Statement of Overriding
Considerations.
Standard Conditions and Requirements
• Final Program EIR Section 3.2: Aesthetics and Visual ResourcesThe Community
Development Director and City Engineer shall review and approve the project's
conformance with contour grading concept design consistent with recommendations in
the City's Hillside Management Ordinance and City Council Resolution No. 2000 -1874.
Grading permits shall not be issued until 40 -scale grading plans have been developed
that incorporate contour grading techniques. The project shall be constructed in accord
with approved grading plans.
Mitigation Measures
Final Program EIR Section 3.2: Aesthetics and Visual Resources
Prior to the approval of any final tract maps, a detailed landscape plan shall be reviewed
and approved by the City of Moorpark Community Development Department. The plan
shall be prepared and certified by a restoration ecologist or licensed landscape architect
with expertise in native plant materials and habitat restoration, and shall comply with
Community Development standard plans, adopted planned community regulations, and
Standard Conditions of Approval.
2. All concrete structures, such as drainage ditches, detention basins, rip -rap, crib walls,
swales, or curbs, located in natural areas shall be constructed with colored concrete to
blend with the surrounding terrain.
3. Above -grade infrastructure such as water tanks, water lines, etc. shall be painted with a
color approved by the City of Moorpark Community Development Department and the
County of Ventura Water and Sanitation Services Division so as to blend in with
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Findings.doc 95
lJ'
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
surrounding terrain. Landscaped berms shall be provided around the tanks to further
screen the view of the tanks from surrounding areas, as determined necessary by the
Community Development Director.
Unavoidable Significant Impact: Increased Night Lighting
Increases in light can be expected to significantly affect the ambient evening light level in and
around the Specific Plan site on a project- specific and cumulative level.
Findings
Changes or alterations have been required in, or incorporated into, the Project which
substantially lessened the significant environmental effect as identified in the Final Program
EIR. Specific economic, legal, technological, or other considerations, including the provision of
employment opportunities for highly trained workers, make infeasible the Project alternatives
identified in the Final Program EIR that would reduce this impact to a less -than significant level.
Facts in Support of Finding
The significant effect has been substantially lessened but cannot be reduced to a level less than
significant by inclusion of project design features and standard conditions and requirements as
identified in the Final Program EIR. The unavoidable cumulative effect is considered acceptable
when balanced against the facts set forth in the Statement of Overriding Considerations.
Project Desiqn Features
Final Program EIR Section 3.2: Aesthetics and Visual Resources
• A graded site and access road will be provided for the future relocation of the Moorpark
College Observatory to the North Park Nature Preserve.
Standard Conditions and Reauirements
Final Program EIR Section 3.2: Aesthetics and Visual Resources
All commercial, industrial, institutional, and multi - family residential projects shall have the
lighting system and its components incorporated into the project and approved by the
City of Moorpark Lighting Engineer prior to the issuance of a building permit for the
project. Each lighting plan shall incorporate electrical plans and structural plans which
detail the provision of lighting systems for exteriors of all buildings, parking lots, loading
areas, walkways, public use areas, public art displays, fountains, or landscape areas
(source: Moorpark Municipal Code §17.30.060).
All lighting along the perimeter of natural areas, particularly street lights, shall be
downcast luminaries and shall be shielded and oriented in a manner that will prevent
spillage or glare into the remaining natural and open space areas. Final lighting
orientation and design shall be to the satisfaction of the City Engineer and Director of
Community Development. All lighting proposed shall be consistent with Chapter 17.30
of the Municipal Code.
• Prior to final inspection or issuance of a certificate of occupancy, where applicable, the
City of Moorpark Lighting Engineer shall cause to be performed a photometric field
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 96
(�% r° 4
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
inspection of the approved lighting system for the project. The inspection shall verify the
proper construction and installation of materials within the approved plan, determine the
actual light patterns and values through light meter testing and observation, and
determine the extent of any errant lighting. Deviations and /or violations shall be
corrected prior to the final clearance for the project (source: Moorpark Municipal Code
§17.30.080; Ord. 266 §2 (part), 1999).
TRANSPORTATION AND CIRCULATION
Unavoidable Significant Impact: Unmitigated Intersection Impacts at Spring Road at High
Street Under Circulation Option B
The Specific Plan (Phase A With Buildout) will generate 22,734 average daily trips (ADT) with
1,395 a.m. and 2,364 p.m. peak hour trips. Phase A will generate 8,264 ADT with 653 a.m. and
1,087 p.m. peak hour trips. Buildout will generate 14,734 ADT with 876 a.m. and 1,277 p.m.
peak hour trips. Circulation Option B assumes that the SR -118 arterial bypass is constructed
only from Spring Road to its western termination at Los Angeles Avenue. In other words, the
segment between the SR -118 freeway and Spring Road is not assumed to be constructed by
2020. Without a continuous North Hills Parkway (Circulation Option B), the volume increase on
Los Angeles Avenue caused by SR -118 through traffic would result in the need for further
improvements along Los Angeles /New Los Angeles Avenue, including improvements to the
intersection of Spring Road at High Street. Improvement to the intersection of Spring Road at
High Street would require the widening of High Street to four lanes. This is not considered a
feasible improvement because of the existing geometrics of the intersection, topography, and
resulting property acquisition that would be required.
Finding
Changes or alterations have been required in, or incorporated into, the Project which
substantially lessened the significant environmental effect as identified in the Final Program
EIR. Specific economic, legal, technological, or other considerations, including the provision of
employment opportunities for highly trained workers, make infeasible the Project alternatives
identified in the Final Program EIR that would reduce this impact to a less -than significant level.
Facts in Support of Finding
The significant effect under Circulation Option B has been substantially lessened but cannot be
reduced to a level less than significant by inclusion of standard conditions and requirements and
the adoption of mitigation measures as identified in the Final Program EIR. The unavoidable
effect is considered acceptable when balanced against the facts set forth in the Statement of
Overriding Considerations.
Standard Conditions and Requirements
Final Program EIR Section 3.3: Transportation and Circulation
For all residential, commercial, and industrial entitlement permits, the applicant shall
provide, where feasible and appropriate:
A. Transit stop improvements, including but not limited to bus pullouts, bus pads or
shelters, as required by the decision - making body or other agency;
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 97
0�a.�
"✓ ram A. IIV
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
B. Safe and convenient access for pedestrians and bicyclists from the external
circulation system to onsite buildings or internal street/sidewalks (source: Moorpark
Municipal Code §17.48.010).
• As a condition of the issuance of a building permit for each residential unit, the developer
shall pay the City of Moorpark a traffic mitigation fee ( "Citywide Traffic Fee "). The
Citywide Traffic Fee may be expended by City in its sole and unfettered discretion.
Prior to issuance of a building permit, the developer shall pay to the City of Moorpark the
Area of Contribution (AOC) Fees for Los Angeles Avenue AOC. The developer shall
also contribute to any cumulative traffic fee program adopted by the City prior to
issuance of the first residential building permit for the project. AOC fees shall be those
that are in effect at the time of building permit issuance. In addition to the AOC fees, the
developer shall be required to make similar pro -rata contributions to any other traffic
mitigation related pre- construction impact fees approved by the City Council to offset the
long term effects on the City's street system. If the residential portion of the project is
constructed prior to any such additional mitigation fee programs being adopted, for
impacts to intersections outside of the Los Angeles Avenue AOC, a proportionate share
of future improvement costs shall be collected for locations where project traffic has a
measurable effect on cumulative traffic volumes. The City Traffic Engineer and
Community Development Director shall determine the required contributions prior to
issuance of building permits. Fees shall be paid prior to the issuance of these permits.
• The applicant of the North Park Specific Plan project shall pay County of Ventura Traffic
Impact Mitigation Fees to fund roadway and highway improvements on County facilities
resulting in significant impacts to roadways in unincorporated Ventura County. The
Specific Plan site is located within County Land Use District 4.
Mitigation Measures
Final Program EIR Section 3.3: Transportation and Circulation
3. The project applicant shall fund its pro -rata share of the costs of improvements to the
City of Moorpark intersections indicated in Table 3.3 -26 of the Final Program EIR.
TABLE 3.3 -26
SHORT -RANGE (2007) WITH PHASE A
TRANSPORTATION MITIGATION PROGRAM
SACommunity Development \DEV PMMS P \11 -North Park \Environmental \050512 Draft Findings.doc 98
V 't ill -A. A.
Fair Share
Improvement Location
Improvement
Requirement
Roadway Improvements
Los Angeles Avenue Widen to six lanes from Spring Road to Moorpark Avenue 2%
Intersection Improvements
4. Collins Dr. at Campus Park
Convert NBR to free NBR, convert 2nd EBT to EBR, add 2nd
9%
Drive
WBL, and modify signal to provide EBR overlap with NBL
7. Collins Dr. at SR -118
Convert WBR to free WBR
4%
westbound ramps
8. Collins Dr. at SR -118
Signalize
4%
eastbound ramps /Los
Angeles Avenue
SACommunity Development \DEV PMMS P \11 -North Park \Environmental \050512 Draft Findings.doc 98
V 't ill -A. A.
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
4. The project applicant shall fund its pro -rata share of the costs of improvements to the
City of Moorpark intersections indicated in Table 3.3 -27 of the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North ParMEmAronmental \050512 Draft Findings.doc 99
0. C
Fair Share
Improvement Location
Improvement
Requirement
10. Tierra Rejada Rd. at Los
Add 2nd SBT and modify signal to provide NBR overlap with
1 %
Angeles Avenue
WBL
12. Spring at Los Angeles Ave.
Add 2nd SBL and 3rd WBT, convert 2nd EBL to 3rd EBT and
2%
convert NBR to shared 2nd NBT /NBR
13. Science Dr. /Miller Pkwy.
Add 2nd WBL, convert 2nd NBL to shared NBL/NBT, convert
3%
at New Los Angeles Ave.
NBT to 2nd NBR, convert SBT to shared SBL/SBT, and
modify signal to provide N/S split phasing and to provide NBR
overlap with WBL
21. Miller Pkwy. /Moorpark
Modify signal to provide SBR overlap with EBL and EBR
2%
Road at Tierra Rejada Rd.
overlap with NBL
23. SR -23 southbound ramps at
Convert SBL to shared SBL/SBR
2%
Tierra Rejada Rd.
NBL: northbound left -turn lane NBT: northbound through lane NBR: northbound right -turn lane
Note: These abbreviations also apply to southbound, eastbound, and westbound movements
Source: North Park Village Specific Plan Traffic Analysis, Austin -Foust Associates, Inc., May 2003.
4. The project applicant shall fund its pro -rata share of the costs of improvements to the
City of Moorpark intersections indicated in Table 3.3 -27 of the Final Program EIR.
SACommunity Development \DEV PMTS \S P \11 -North ParMEmAronmental \050512 Draft Findings.doc 99
0. C
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinas of Fact
TABLE 3.3 -27
LONG -RANGE (2020) WITH SPECIFIC PLAN BUILDOUT
TRANSPORTATION MITIGATION PROGRAM
FREEWAY TRAFFIC
Unmitigated Significant Impact: SR -118 and SR -23 Freeway Mainline Segments
With Phase A, the following SR -118 freeway mainline segments will operate at an unacceptable
level of service (LOS F):
• East of Princeton Drive eastbound and westbound
• East of Collins Drive, eastbound and westbound
With Specific Plan Buildout, the following SR -118 freeway mainline segments will operate at an
unacceptable level of service (LOS F):
• North of New Los Angeles Avenue, northbound and southbound
• East of Princeton Drive, eastbound and westbound
• East of Moorpark College, eastbound and westbound
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Findings.doc 100
A
Fl � � r.-
Fair Share
Improvement Location
Improvement
Requirement
Roadway Improvements
Los Angeles Avenue
Widen to six lanes from Moorpark Avenue to Gabbert Road/
1 -2%
Tierra Rejada Road, and widen to four lanes from Gabbert
Road/Tierra Rejada Road to west of the City limits
North Hills Parkway
Construct as four -lane arterial from the eastern boundary of
4 -5%
the Hitch Ranch Specific Plan site to Spring Road, and as a
six -lane arterial from Spring Road to SR -118
Spring Road
Widen to four lanes from Peach Hill Rd to Tierra Rejada Road
<1%
Intersection Improvements
8. Collins Dr. at SR -118
Convert WBT to shared WBT/WBR
4%
eastbound ramps /Los
Angeles Avenue
10. Tierra Rejada Rd. at Los
Add 2nd NBT
<1%
Angeles Avenue
11. Moorpark Ave. at Los
Convert WBR to shared 3rd WBT/WBR and modify signal to
2%
Angeles Avenue
eliminate WBR overlap with SBL
23. SR -23 southbound ramps at
Add 3rd WBT
2%
Tierra Rejada Rd.
31. Spring Rd. at North Hills
New intersection: signalize and provide NBL, dual NBT, NBR,
4%
Parkway
dual SBL, dual SBT, EBL, 3 EBT, WBL, 3 WBT, WBR, NBR
overlap with WBL and WBR overlap with SBL
NBL: northbound left -turn lane NBT: northbound through lane NBR: northbound right -turn lane
Note: These abbreviations also apply to southbound, eastbound, and westbound movements
Source: North Park Village Specific Plan Traffic Analysis, Austin -Foust Associates, Inc., May 2003.
FREEWAY TRAFFIC
Unmitigated Significant Impact: SR -118 and SR -23 Freeway Mainline Segments
With Phase A, the following SR -118 freeway mainline segments will operate at an unacceptable
level of service (LOS F):
• East of Princeton Drive eastbound and westbound
• East of Collins Drive, eastbound and westbound
With Specific Plan Buildout, the following SR -118 freeway mainline segments will operate at an
unacceptable level of service (LOS F):
• North of New Los Angeles Avenue, northbound and southbound
• East of Princeton Drive, eastbound and westbound
• East of Moorpark College, eastbound and westbound
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Findings.doc 100
A
Fl � � r.-
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
• East of Madera Road, eastbound and westbound
• East of First Street, eastbound and westbound
• East of Erringer Road, eastbound and westbound
• East of Sycamore Road, eastbound and westbound
With programmed SR -118 improvements, the Project would not impact the following freeway
mainline segments:
• North of New Los Angeles Avenue, northbound and southbound
• East of Moorpark College, eastbound and westbound
• East of Erringer Road, eastbound
• East of Sycamore Road, eastbound and westbound
With Specific Plan Buildout, the following SR -23 freeway mainline segment will operate at an
unacceptable level of service (LOS F):
• South of New Los Angeles Avenue, northbound
With programmed SR -23 improvements, the Project would not impact this freeway mainline
segment.
Finding
Specific economic, legal, technological, or other considerations, including the provision of
employment opportunities for highly trained workers, make infeasible the Project alternatives
identified in the Final Program EIR that would reduce this impact to a less -than significant level.
Facts in Support of Finding
The significant effect cannot be reduced to a level less than significant as there is no feasible
project- specific mitigation available. The unavoidable effect is considered acceptable when
balanced against the facts set forth in the Statement of Overriding Considerations.
BIOLOGICAL RESOURCES
Unmitigated Sianificant Impact: Loss of Raotor Foraaina Habitat
The development area provides high quality foraging habitat for raptors, including special status
raptor species. The loss of native grassland and non - native grassland (Phase A and Buildout),
which is high quality foraging habitat, contributes to an ongoing regional and local loss of
foraging and nesting habitat for these special status raptor species. This impact is significant.
Findings
Changes or alterations have been required in, or incorporated into, the Project which
substantially lessened the significant environmental effect as identified in the Final Program
EIR. Specific economic, legal, technological, or other considerations, including the provision of
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 101
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findinos of Fact
employment opportunities for highly trained workers, make infeasible the Project alternatives
identified in the Final Program EIR that would reduce this impact to a less -than significant level.
Facts in Support of Finding
The significant effect has been substantially lessened but cannot be reduced to a level less than
significant by inclusion of project design features and the adoption of the following mitigation
measure as identified in the Final Program EIR. The unavoidable effect is considered
acceptable when balanced against the facts set forth in the Statement of Overriding
Considerations.
Project Design Features
Final Program EIR Section 3.6: Biological Resources
Open Space Nature Preserve. This project design feature would offset the impacts on
coastal sage scrub vegetation and native grassland vegetation. Approximately 2,123
acres of the site will be preserved as a Nature Preserve. Table 3.6 -5 of the Final
Program EIR lists the acres of habitat located within the Nature Preserve. (See
complete wording of the Open Space Nature Preserve project design feature above for
coastal sage scrub.)
A Conservation Organization shall be chosen by the City of Moorpark (in coordination
with the U.S. Fish and Wildlife Service and the California Department of Fish and Game
if necessitated by any regulatory permitting requirements) to manage the Nature
Preserve. The project applicant shall provide a mechanism (such as a non - wasting
endowment or landscape maintenance district) acceptable to both the City and
Conservation Organization to fund ongoing management costs of the Conservation
Organization.
Mitigation Measure
Final Program EIR Section 3.6: Biological Resources
9. The project has the potential to impact nesting raptors, including the white - tailed kite,
northern harrier, Cooper's hawk, golden eagle, long -eared owl, and burrowing owl, as
well as other common raptor species, should they nest within the Specific Plan
development area.
No earlier than 45 days and no later than 20 days prior to construction or grading /site
preparation activities that would occur during the nesting /breeding season of native
raptor species potentially nesting on the site (typically February through August), the
applicant shall have a survey conducted by a qualified biologist approved by the
Community Development Director to determine if active raptor nests are present in the
construction zone or within 200 feet of the construction zone. A report of this field
survey shall be submitted to the Community Development Director. Construction can
proceed if no active raptor nests are located during this survey. If an active nest is found
during the survey, a 500 -foot (this distance may be vary depending on the raptor species
and construction activity, as determined by the biologist) fence barrier (subject to the
review and approval of the Community Development Director) shall be erected around
the nest site and clearing and construction within the fenced area shall be postponed or
halted, at the discretion of the biological monitor, until the nest is vacated and juveniles
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 102
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
have fledged and are independent of the nest, as determined by the biologist, and there
is no evidence of a second attempt at nesting. The biologist shall serve as a
construction monitor during those periods when construction activities shall occur near
active nest areas to ensure that no inadvertent impacts on these nests shall occur.
Results of the raptor survey and any subsequent monitoring shall be provided to the
California Department of Fish and Game and any other appropriate agency.
6.0 FINDINGS REGARDING ORIGINALLY PROPOSED PROJECT AND OTHER
ALTERNATIVES
A. INTRODUCTION
Per CEQA Guidelines Section 15126.6(a):
An EIR shall describe a range of reasonable alternatives to the project, or to the location of
the project, which would feasibly attain most of the basic objectives of the project but would
avoid or substantially lessen any of the significant effects of the project, and evaluate the
comparative merits of the alternatives. An EIR need not consider every conceivable
alternative to a project. Rather it must consider a reasonable range of potentially feasible
alternatives that will foster informed decision making and public participation. An EIR is not
required to consider alternatives which are infeasible. The lead agency is responsible for
selecting a range of project alternatives for examination and must publicly disclose its
reasoning for selecting those alternatives. There is no ironclad rule governing the nature or
scope of the alternatives to be discussed other than the rule of reason.
Upon analyzing Alternative A and comparing the same against the originally proposed project,
the City identified Alternative A as its "preferred project" (Project)." The following summary and
Findings compare the Project against the individual project alternatives identified and evaluated
in the Final Program EIR (see, Section 4 of the Final Program EIR).
In making the following alternatives Findings, the City Council certifies that it has independently
reviewed and considered the information on alternatives provided in the Final Program EIR,
including the information provided in comments on the Draft Program EIR and Recirculated
Draft Program EIR that proposed other options for development and use of the Project area and
the responses thereto. The Final Program EIR's discussion and analysis of these alternatives is
not repeated in these Findings, but the discussion and analysis of the alternatives in the Final
Program EIR is incorporated in these Findings by reference.
ORIGINALLY PROPOSED PROJECT
Description
The originally proposed North Park Specific Plan project set forth in the Program EIR would
allow for the development of 1,650 residential dwelling units on 769.7 acres of the 3,586.3 -acre
site. Other proposed related and supporting uses would include a 5 -acre neighborhood
commercial center, a 12 -acre school site, a 29.1 -acre public community park and two additional
public parks, seven private parks, a 52 -acre publicly accessible lake; a fire station site; and a
day care /other quasi public facility site. Ancillary land uses would include, but are not limited to,
water reservoirs, detention basins, and a fire service helispot. The phasing and circulation
assumptions for the originally proposed project and Alternative A are the same.
SACommunity Development\DEV PMTS \S P \11 -North Park\Environmental\050512 Draft Findings.doc 103
0 .��
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Conclusion
Although the originally proposed project would meet the objectives of the City and the project
applicant, Alternative A addresses issues and environmental concerns raised by agencies and
the public. As such, Alternative A represents a modification to the originally proposed project.
NO PROJECT ALTERNATIVE — RETENTION OF SITE IN ITS EXISTING CONDITION
Description
The No Project Alternative assumes no development on the 3,544.3 -acre North Park Specific
Plan site or 42 -acre access road alignment and SR -118 interchange area; the site would remain
in its existing condition. The Specific Plan site is predominately undeveloped. The site contains
limited site improvements to accommodate existing land uses with dirt and semi -paved roads,
corrals, fences, and watering facilities for grazing animals. Onsite land uses are limited to oil
extraction operations (primarily in the northern and eastern portion of the site) and cattle
grazing. There is one residence on the site. This project alternative assumes that the retention
of onsite structures with continued use of the site with cattle grazing and oil extraction activities;
oil operations could be expanded.
Conclusion
The City hereby finds that specific economic, social, or other considerations make this
alternative infeasible for the following reasons:
This alternative maintains the project site as undeveloped site, which fails to recognize the need
for increased housing in the area. The No Project Alternative does not create land uses to
serve the residents of the City of Moorpark, nor does it propose to preserve any of the subject
property.
Although the No Project Alternative would eliminate unavoidable impacts that would occur with
Alternative A (short-term and long -term changes to the site's visual character, traffic impacts
associated with Option B, and loss of foraging and nesting habitat for special status raptor
species), the No Project Alternative does not meet the objectives for the North Park Specific
Plan site, including:
• General Plan Consistency: Seek an amendment to the City of Moorpark General Plan to
include a Specific Plan designation for the North Park project site that is consistent with
the City of Moorpark General Plan and that provides for the creation of a community
comprised primarily of larger lot single - family detached homes and affordable attached
and /or detached units necessary to comply with the Moorpark Housing Element. Seek
Moorpark voter approval of an amendment to the City Urban Restriction Boundary
(CURB) line to the General Plan Land Use Element to include the project site, exclusive
of the proposed Nature Preserve within the Moorpark CURB line.
Managed Nature Preserve and Open Space: Conserve environmental resources and
buffer Moorpark from adjacent communities, create a conservation program which
permanently preserves a large majority of the North Park planning area, and create a
significant Nature Preserve and an open space program.
Comprehensive Park and Recreation System: Provide a comprehensive park and
recreation system throughout North Park, including the development of a large scale
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental\050512 Draft Findings.doc 104
V��
r% i.W
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
community park and public neighborhood parks complemented by a series of private
parks.
• Recreation Lake: Provide a large -scale recreation lake designed and configured to be
used by the residents of North Park and the general public.
• Circulation: Plan, fund, construct, and phase an integrated circulation system that
supports the planned development, serves residential needs, provides enhanced access
to Moorpark College and minimizes impacts on existing residences, including the
construction of a new freeway interchange on SR -118 connecting the planning area and
Moorpark College.
• Schools: Ensure the timely provision of public schools through the dedication of a
school site within the North Park planning area, and the funding of the new school,
consistent with state law requirements.
• Positive Fiscal Impact: Create a Specific Plan that is capable of being implemented in
manner that represents a positive financial contribution to the City of Moorpark.
• Public Facilities and Safety: Ensure the provision of necessary public services and
facilities that meet the City's standards, including mechanisms to assure appropriate
phasing and financing of such facilities, such as: police, fire, emergency services,
streets and road improvements, water, urban run -off, flood control, and sewage disposal
facilities necessary to support North Park.
• Water Conservation: Use water resources wisely through the application of recycled
water where feasible and the implementation of water conservation measures.
• Water Quality: Ensure that the project complies with all applicable non -point discharge
water quality control requirements during construction and operation of the project.
• Annexation: Seek annexation of the project site into the City of Moorpark, which would
enable the City to locally govern the appropriate use of the property.
The No Project Alternative would not provide the benefits to the City of Moorpark as set forth in
the Statement of Overriding Considerations.
EXISTING ZONING ALTERNATIVE: DEVELOPMENT CONSISTENT WITH COUNTY OF
VENTURA LAND USE DESIGNATIONS (89 RESIDENTIAL UNITS)
Description
The Existing Zoning Alternative assumes that future development of the site would occur under
the existing land use development assumptions established in the Ventura County General Plan
and Zoning Ordinance. The County of Ventura would be the lead agency; the project site would
remain in unincorporated Ventura County. The Ventura County General Plan designates the
Specific Plan site as Open Space (10 acre +). The County of Ventura General Plan indicates
that the smallest minimum parcel size consistent with the Open Space land use category is
10 acres. Subzones may require larger minimum parcel sizes. The minimum parcel size for
Open Space properties contiguous with properties designated Agriculture is 20 acres. The
County of Ventura Non - Coastal Zoning Ordinance designates the Specific Plan site Agricultural
Exclusive (A -E). The minimum lot area for development in the A -E zone is 40 acres. The
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Find ings.doc 105
0 )
lJ` V y rw
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
permitted uses allowed in the A -E zone without discretionary approval include: animal
husbandry; crop production; retail produce stands (up to 500 square feet); accessory
agricultural uses, including storage; day and residential care facilities; single - family dwellings;
recreation facilities for nonmotorized wheel conveyances; dwellings, accessory uses, such as
for animals, home occupations, and open storage; mineral resource development for Public
Works maintenance; and temporary motion picture and television production and related
activities.
This alternative assumes development of the Specific Plan site under the County's General Plan
and Zoning Ordinance designations for the site; no development is assumed on the 42 acres
that would be used, as a part of the project, for the freeway interchange with SR -118 and the
connector road. This project alternative does not assume any amendments to the County of
Ventura General Plan or Zoning Map. Therefore, the 3,544.3 acres of the Specific Plan site
would be developed with up to 89 residential units on 40 -acre lots. None of the other land uses
assumed as a part of the project would be implemented as a part of this alternative. For
example, the 2,123 -acre Nature Preserve is not a part of this alternative. While only one
dwelling unit is assumed for each 40 acres of the site, this alternative would allow for the
remainder of individual parcels to be used for crop production, such as orchards. It is assumed
that the siting of 89 dwelling units would be accomplished in a manner to avoid land use
conflicts, including existing oil wells.
Conclusion
The City hereby finds that specific economic, social, or other considerations make this
alternative infeasible for the following reasons:
This alternative is infeasible because the existing Open Space land use designation will not
allow commercial uses that will create economic benefits to the City in terms of additional sales
tax revenues. This alternative addresses the need for additional housing within the City of
Moorpark.
This alternative would only meet one of the applicant's objectives: Landform Protection:
Preserve a significant portion of the planning area's steep slopes and soften the development
edges of North Park through compliance with the City's Hillside Management Standards and
use of contoured grading techniques, and revegetated graded areas to stabilize soils and
minimize erosion.
ANNEXATION /NO CURB AMENDMENT ALTERNATIVE: MARKET -RATE HOUSING
DEVELOPMENT SCENARIO IF SITE IS ANNEXED TO CITY OF MOORPARK AND
CURB IS NOT AMENDED (177 RESIDENTIAL UNITS)
Description
The Annexation /No CURB Amendment Alternative assumes annexation of the property by the
City of Moorpark and development consistent with all objectives, principles, and implementation
guidelines set forth in the Moorpark SOAR Initiative with a general plan designation and zoning
established by the City to allow maximum permissible development of market rate housing
without amending the Moorpark City Urban Restriction Boundary (Moorpark CURB) line. It also
assumes development would take place as a single phase prior to the expiration of the
Moorpark CURB line. The Moorpark SOAR Initiative does not prohibit annexation during its
lifetime nor does it provide for automatic annexation upon its expiration.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 106
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
The Moorpark CURB line is currently coterminous with and in the same location as the Sphere
of Influence line and municipal boundary line. The North Park Specific Plan site is located
outside of the CURB line. Consistent with Moorpark SOAR Initiative, "the City of Moorpark shall
restrict urban services and urbanized uses of land to within the Moorpark CURB until
December 31, 2020. 'Urbanized uses of land' is defined as any development which would
require the establishment of new community sewer systems or the significant expansion of
existing community sewer systems; or would result in the creation of residential lots less than
20 acres in area; or would result in establishment of commercial or industrial uses which are not
exclusively agriculturally - related."
With development of 1 unit per 20 acres over the entire site, exclusive of the freeway
interchange with SR -118 and the connector road (3,544.3 acres), the Annexation /No CURB
Amendment Alternative assumes 177 residential units could be developed. None of the other
land uses assumed for the project would be implemented as a part of this alternative. The
2,123 -acre Nature Preserve is not a part of this alternative.
Conclusion
The City hereby finds that specific economic, social, or other considerations make this
alternative infeasible for the following reasons:
This alternative would result in a reduction of environmental impacts when compared to
Alternative A because less intensive development would occur on the site (177 dwelling units
instead of 1,680 dwelling units). This alternative would only partially fulfill the need for
additional residential units in the City of Moorpark. However, this limited development on the
site would not meet the project objectives:
General Plan Consistency: Seek an amendment to the City of Moorpark General Plan to
include a Specific Plan designation for the North Park project site that is consistent with
the City of Moorpark General Plan and that provides for the creation of a community
comprised primarily of larger lot single - family detached homes and affordable attached
and /or detached units necessary to comply with the Moorpark Housing Element. Seek
Moorpark voter approval of an amendment to the City Urban Restriction Boundary
(CURB) line to the General Plan Land Use Element to include the project site, exclusive
of the proposed Nature Preserve within the Moorpark CURB line.
Managed Nature Preserve and Open Space: Conserve environmental resources and
buffer Moorpark from adjacent communities, create a conservation program which
permanently preserves a large majority of the North Park planning area, and create a
significant Nature Preserve and an open space program.
• Landform Protection: Preserve a significant portion of the planning area's steep slopes
and soften the development edges of North Park through compliance with the City's
Hillside Management Standards and use of contoured grading techniques, and
revegetated graded areas to stabilize soils and minimize erosion.
Comprehensive Park and Recreation System: Provide a comprehensive park and
recreation system throughout North Park, including the development of a large scale
community sports park and public neighborhood parks complemented by a series of
private parks.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 107
s'1!4'%A i"R Ilo
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
• Recreation Lake: Provide a large scale recreation lake designed and configured to be
used by the residents of North Park and the general public.
• Circulation: Plan, fund, construct, and phase an integrated circulation system that
supports the planned development, serves residential needs, provides enhanced access
to Moorpark College and minimizes impacts on existing residences, including the
construction of a new freeway interchange on SR -118 connecting the planning area and
Moorpark College.
• Schools: Ensure the timely provision of public schools through the dedication of a
school site within the North Park planning area, and the funding of the new school,
consistent with state law requirements.
• Positive Fiscal Impact: Create a Specific Plan that is capable of being implemented in
manner that represents a positive financial contribution to the City of Moorpark.
• Public Facilities and Safety: Ensure the provision of necessary public services and
facilities that meet the City's standards, including mechanisms to assure appropriate
phasing and financing of such facilities, such as: police, fire, emergency services,
streets and road improvements, water, urban run -off, flood control, and sewage disposal
facilities necessary to support North Park.
• Water Conservation: Use water resources wisely through the application of recycled
water where feasible and the implementation of water conservation measures.
• Water Quality: Ensure that the project complies with all applicable non -point discharge
water quality control requirements during construction and operation of the project.
• Annexation: Seek annexation of the project site into the City of Moorpark, which would
enable the City to locally govern the appropriate use of the property.
The benefits assumed as a part of Alternative A and set forth in the Statement of Overriding
Considerations would not be provided with this Alternative.
DESIGN ALTERNATIVE 1: DEVELOPMENT THAT INCREASES OPEN SPACE AREAS
BY ELIMINATING THE LAKE (1,650 RESIDENTIAL UNITS)
Description
Design Alternative 1 assumes development of the site consistent with Alternative A project, with
the exception of the lake. The area identified for the publicly accessible lake would be used for
housing and additional open space areas. The alternative would require the same project
actions as the Alternative A project. The major difference between Buildout of Design
Alternative 1 and the project would be an increase in the amount of open space and
redistribution of residential areas to where the lake would have been located. The limits of
grading and lot sizes would be similar.
Conclusion
The City hereby finds that specific economic, social, or other considerations make this
alternative infeasible for the following reasons:
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 10$
6V01 1 ;3
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
Design Alternative I would result in fewer environmental impacts than the Alternative A due to
the elimination of the man -made lake, and is therefore considered environmentally superior to
Alternative A. However, as with Alternative A, this alternative would result in the significant,
unavoidable impacts: short-term and long -term changes to the site's visual character, increased
traffic impacts to local roadways and freeway capacities, and loss of foraging and nesting
habitat for special status raptor species.
Development of the project site with Design Alternative I would meet all but one of the project
objectives: Recreation Lake: Provide a large scale recreation lake designed and configured to
be used by the residents of North Park and the general public.
Therefore, this alternative does not assume that community benefits associated with the lake in
Alternative A.
DESIGN ALTERNATIVE 2: DEVELOPMENT THAT PRESERVES THE EASTERN
PORTION OF THE PROJECT SITE (1,650 RESIDENTIAL UNITS)
Description
Design Alternative 2 would further reduce the amount of development in the eastern portion of
the site and allow for residential development on vacant land (two parcels) west of the existing
westerly boundary of the Specific Plan site. Therefore, the acreage associated with this
alternative is larger than the project site. This alternative would require the acquisition of
property not currently under the ownership of the project applicant or acceptance by the
property owner to develop these parcels. These two parcels are owned by Brad M. Strathearn
and Catherine A. Navarro (source: Hidden Creek Ranch Specific Plan No. 8 EIR).
With respect to the eastern portion of the site, Design Alternative 2 would not include the
development of Planning Area 1 or the eastern half of Planning Areas 2 and 3. This alternative
would not increase the size of the Nature Preserve; although no development would occur in
this area. Continued use of this area for oil production and cattle grazing is assumed.
Single- family residential development would be implemented on vacant land west of the
boundary of the Specific Plan site. Design Alternative 2 assumes development with 1,650
residential dwelling units, and the Project assumes the development of 1,680 residential
dwelling units (the latter provides 30 additional affordable housing units). This additional
westerly development area is also located in the County of Ventura.
Conclusion
The City hereby finds that specific economic, social, or other considerations make this
alternative infeasible for the following reasons:
Design Alternative 2 is not considered environmentally superior to Alternative A. The
significance of environmental impacts related to biological resources associated with Design
Alternative 2 would be reduced from Alternative A because of limiting development to the
western portion of the project site and subsequently increasing the size of the Nature Preserve.
As with Alternative A, Design Alternative 2 would result in significant, unavoidable impacts
associated with short-term and long -term changes to the site's visual character, increased traffic
impacts to local roadways and freeway capacities, and loss of foraging and nesting habitat for
special status raptor species. The remainder of the impacts would be similar to those
associated with Alternative A.
SACommunity Development \DEV PMTS \S P \11 -North Park\Environmental \050512 Draft Findings.doc 1'09
V 11(A ., '- -V I
_A%0
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Findings of Fact
This alternative meets most of the project objectives.
DESIGN ALTERNATIVE 3: DEVELOPMENT WITH GREATER PRESERVATION
OF COASTAL SAGE SCRUB (1,348 RESIDENTIAL UNITS)
Description
The intent of Design Alternative 3 is to minimize impacts to sensitive coastal sage scrub habitat
while allowing comparable development and land uses assumed as a part of the Project. This
alternative would allow for 1,348 residential units, which represents a reduction of 332 units (
20 percent fewer units), when compared to the project. Of the 1,348 units assumed as a part of
this alternative, 1,198 units would be single - family (compared to 1,500 units for the project) and
150 units would be multi - family affordable ; Alternative A would include 180 affordable housing
units including single - family (90) and multi - family (90) units. The other land uses associated
with the project are assumed with this alternative. However, some of the uses would be
reconfigured to allow for the preservation of additional coastal sage scrub habitat.
Large areas of coastal sage scrub are located in the north - central portion of the Specific Plan
site. This alternative assumes the elimination of Planning Areas 4, 5, 28, 57, 58, and 65, and
the reconfiguration of Planning Areas 2 and 59. The publicly accessible recreation lake would
be reduced in size to allow for the siting of a park on the western side of the lake. As with the
project, this alternative assumes that the lake would be located in the central portion of the site.
Because of the reconfiguration of the limits of grading associated with Design Alternative 3 to
reduce impacts to coastal sage scrub, there may be insufficient clay soil materials within the
revised limits of grading to provide lining material for the lake. Up to 84,700 cubic yards of clay
would need to be imported to the Specific Plan site if no onsite clay materials were accessible or
usable.
Conclusion
The City hereby finds that specific economic, social, or other considerations make this
alternative infeasible for the following reasons:
Design Alternative 3 is not environmentally superior to Alternative A. The significance of
biological impacts associated with Design Alternative 3 are slightly reduced from Alternative A
due to the preservation of additional coastal sage scrub habitat. However, the recreational lake
component of the project would also be reduced in size from Alternative A. Design Alternative 3
would result in significant, unavoidable impacts associated with the short-term and long -term
changes to the site's visual character, increased traffic impacts to local roadways and freeway
capacities, and loss of foraging and nesting habitat for special status raptor species, just as with
Alternative A. This alternative would have an incremental decrease in the amount of vehicular
traffic and associated vehicular air quality emissions and noise levels when compared to
Alternative A.
This alternative meets most of the project objectives. This alternative would provide for reduced
residential units than Alternative A (1,198 vs. 1,590 single - family units, the latter inclusive of 90
affordable units). However, the actual density of development would be similar to the project
due to the increase in preserved land. In conclusion, this alternative is not desirable due to the
loss of 332 dwelling units.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Findings.doc 110
North Park Village and Nature Preserve Specific Plan
Final Program FIR No. 2001 -01
Draft Statement of Overriding Considerations
ATTACHMENT A
STATEMENT OF OVERRIDING CONSIDERATIONS
NORTH PARK VILLAGE AND NATURE PRESERVE
SPECIFIC PLAN NO. 2001-01 PROJECT
1.0 INTRODUCTION
The City of Moorpark is the Lead Agency under the California Environmental Quality Act
("CEQA" )2 for preparation, review and certification of the North Park Village and Nature
Preserve Specific Plan No. 2001 -01 Final Program EIR, State Clearinghouse Number
200201114. As the Lead Agency, the City of Moorpark is responsible for determining the
potential environmental impacts of the project ( "Project ") and which of those impacts are
significant and unavoidable. CEQA then requires the Lead Agency to balance the benefits of a
proposed project against its significant, unavoidable adverse environmental impacts in
determining whether or not to approve the project.
CEQA Section 21081 provides that no public agency shall approve or carry out a project for
which an environmental impact report has been certified which identifies one or more significant
effects on the environment that would occur if the project were approved or carried out unless
the agency makes specific findings with respect to those significant environmental effects.
Where a public agency finds that economic, legal, social, technological, or other considerations,
including considerations for the provision of employment opportunities for highly trained
workers, make infeasible the mitigation measures or alternatives identified in the environmental
impact report, and thereby leave significant unavoidable effects, the public agency must also
find that "specific overriding economic, legal, social, technological, or other benefits of the
project outweigh the significant effects on the environment."
In making this determination, the Lead Agency is guided by CEQA Guidelines Section 15093,
which provides as follows:
(a) CEQA requires the decision - making agency to balance, as applicable, the economic,
legal, social, technological, or other benefits of a proposed project against its
unavoidable environmental risks when determining whether to approve the project. If
the specific economic, legal, social, technological, or other benefits of a proposed
project outweigh the unavoidable adverse environmental effects, the adverse
environmental effects may be considered "acceptable."
(b) When the lead agency approves a project which will result in the occurrence of
significant effects which are identified in the final EIR but are not avoided or
substantially lessened, the agency shall state in writing the specific reasons to
support its action based on the final EIR and /or other information in the record. The
statement of overriding considerations shall be supported by substantial evidence in
the record.
(c) If an agency makes a statement of overriding considerations, the statement should
be included in the record of the project approval and should be mentioned in the
notice of determination. This statement does not substitute for, and shall be in
addition to, findings required pursuant to [CEQA] Section 15091.
The California Environmental Quality Act is codified at Public Resources Code Sections 21000 et seq.
S:ICommunity DevelopmenADEV PMMS PI 11 -North ParklEnvironmenfa11050512 Draft Findings.doc
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Statement of Overriding Considerations
Consistent with these provisions of CEQA and the CEQA Guidelines, the City of Moorpark City
Council, acting as Lead Agency and having reviewed the Final Program EIR for the Project and
the public record, adopts this Statement of Overriding Considerations which describes how the
benefits of the Project outweigh its significant, unavoidable adverse environmental impacts.
2.0 SIGNIFICANT UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS
Implementation of project design features, standard conditions and requirements, and mitigation
measures (all as more particularly described in the Statement of Findings and Facts
ffindings'7) identified in the Final Program EIR and the Mitigation Monitoring and Reporting
Program for the Project will mitigate all of the identified environmental effects to less than
significant levels except for unavoidable significant project and cumulative impacts on: (a)
conversion of Farmland of Local Importance; (b) changes to visual character; (c)
topographical /land use changes from conversion of ungraded open space land to urban uses;
(d) increased night lighting; (e) traffic impacts to the intersection of Spring Road at High Street
(under the Long flange (2020), plus Specific Plan Build -Out Circulation Option B); (f) cumulative
traffic impacts on SR -118 and SR -23 freeways; and (g) loss of habitat for special status raptor
species. As addressed in Section 5.0 of the Findings, these impacts would be considered
significant and unavoidable if the project were approved and implemented.
3.0 OVERRIDING CONSIDERATIONS
Having reduced the environmental effects of the Project, having adopted the mitigation program
identified in the Final Program EIR and the Mitigation Monitoring and Reporting Program, and
having balanced the specific economic, legal, social, technological, and other benefits of the
Project against the Project's unavoidable significant impacts, the City Council of the City of
Moorpark hereby determines that the benefits of the Project outweigh the unavoidable
significant impacts and that such impacts are nevertheless "acceptable," based on one or more
of the following overriding considerations.
NATURE PRESERVE AND OPEN SPACE SYSTEM
Over 71 percent (approximately 2,558 acres) of the Specific Plan area will be set aside as a
nature preserve (2,123 acres) and for open space (437 acres), as well as approximately 132
acres for parks and recreational uses inclusive of the publicly accessible lake. The Nature
Preserve area (Planning Area 27), consisting of approximately 2,123 acres as shown in Specific
Plan 11, provides a permanent open space system, at no public cost, for purposes of
conserving, protecting, and enhancing sensitive habitats, significant landforms and scenic
views, and important wildlife corridors; the system also establishes a permanent open space
buffer between the cities of Moorpark and Simi Valley. Granted by deed to an entity approved
by the City and Developer, the Nature Preserve would allow for the permanent provision of
natural open space for public access to property currently held as private property. Additionally,
the Project provides approximately 14.7 miles of public trails into the Nature Preserve that are
connected to the County's Happy Camp Canyon regional trail system.
PROVISION OF NEEDED HOUSING
State law requires all regional councils of government, which include the Southern California
Association of Governments (SCAG), to determine the existing and future housing need for its
region (Government Code Section 65580 et. seq.). SCAG is also required to determine the
share of need allocated to each city and county within the SCAG region. This is called the
Regional Housing Needs Assessment (RHNA). SCAG's housing allocation for Ventura County
S:ICommunity DevelopmentlDEV PMTSIS Plll -North ParklEnvironmentaA050512 Draft Findings.doc
l v v — ow r
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Statement of Overriding Considerations
unincorporated areas and cities are divided into four affordability categories. These income
categories must be considered in calculating future housing needs within a city: (a) Very Low —
Less than 50 percent of the Ventura County median family income; (b) Low -50 to 80 percent of
the Ventura County median family income; (c) Moderate -80 to 120 percent of the Ventura
County median family income; and (d) Upper —More than 120 percent of the Ventura County
median family income. The Project provides 1,680 new dwelling units, inclusive of 180
affordable housing units.
With annexation of the Property into the City, the Project would make a significant contribution
towards meeting the existing RHNA allocation assigned to the City. Of the 180 affordable
housing units, the Project includes 90 single - family detached affordable housing units in
Planning Area 9. The houses shall be sold to families whose income does not exceed 80
percent of the median income for Ventura County at the time of sale for their household size
( "Allowed Median Income "). The Developer is also providing 90 senior rental affordable units
(age 55 or older) in Planning Area 49. Of the 90 units, 18 will be rented to low income tenants
(80 percent of Median Income for Ventura County) and 72 units will be rented to very low
income tenants (60 percent of Median Income for Ventura County).
The 1,680 dwelling units will provide greater and much needed housing opportunities for
individuals living and working in the City and regional area. In short, implementation of the
Project will assist the City in achieving its goal of providing an adequate supply of housing for
current and future residents.
LOCAL AND REGIONAL TRANSPORTATION IMPROVEMENTS AND CONTRIBUTIONS
Development of the Project, in combination with other cumulative traffic, will result in an
increase in traffic volume within the identified traffic study area. In the absence of affirmative
mitigation, said traffic volume increase would produce significant impacts upon the existing
transportation network serving the Project area and other portions of the traffic study area. The
Project provides for the mitigation of said impacts by obligating the Project applicant to
participate, on a Fair Share basis, in the financing of certain offsite transportation system
improvements. Furthermore, in order to facilitate and promote the City's timely completion and
achievement of these necessary improvements, the Project provides for the following additional
resource assistance to the City:
• Acceleration of transportation improvements identified in the Project Conditions of
Approval for the intersection of Collins Drive at Campus Park Drive. The Project
applicant's Fair Share payment obligations for the transportation improvements identified
in the Project Conditions of Approval for the intersection of Collins Drive at Campus
Park Drive is 9 percent. All improvements, over which the City has full permit authority,
will be completed prior to the City's issuance of the first grading permit for onsite
development; all improvements will be completed prior to occupancy of the first
residential dwelling unit. The existing level of service (LOS) at the intersection of
Collins Drive at Campus Park Drive is LOS E in the a.m. peak hour and is projected to
decline in the future without the Project and with cumulative growth to LOS F in the a.m.
peak hour and LOS D in the p.m. peak hour. With the transportation improvements
funded by the Developer for this intersection, the level of service with the Project would
improve to LOS A in the a.m. and p.m. peak hours through Phase A of the Project with
cumulative growth, and be at LOS B in the a.m. and p.m. peak hours with Project
Buildout plus cumulative growth.
&ICommunity DevelopmentlDEV PMTSIS PIll -North ParklEnvironmental1050512 Draft Findings. doc 3
0 �:✓ V 1- V
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Statement of Overriding Considerations
Private funding and construction of the four -lane Moorpark College Road and the
Moorpark College Freeway Interchange at State Route 118.
RECEATIONAL FACILITIES
The Project is required to dedicate 26 acres (of park land or pay in -lieu fees or a combination
thereof to satisfy Quimby Act as set forth in California Government Code section 66477 et seq.
The Project provides approximately 64 acres of park land, including approximately 39 acres of
public park land (a 26 -acre Community Park, 9 -acre Lakeside Park, and 4.5 -acre Nature Park).
The Developer will provide funding, as set forth in the Development Agreement, for
improvements to the park land. Additionally, the Project provides for the creation of a 67.7 -acre
publicly accessible recreation lake area, which includes a 52 -acre lake surface and 15.7 -acre
lake buffer with a public lake trail.
FIRE STATION
The Developer is providing clear title, access, and all utilities for a 1.5 -acre site (Planning Area
23) to the Ventura County Fire Protection District (VCFPD) for a fire station prior to issuance of
the 501 st building permit. The parcel will revert to the City for public use if not used by VCFPD
for fire service purposes. The Developer is paying the required VCFPD Fire Impact Fee, plus
additional funds as set forth in the Development Agreement to fund the construction of the fire
station. Without the contribution of land and extraordinary financial contribution by the
Developer, the District would not provide a fire station in the portion of the City. In addition, the
Developer is providing a 2.0 -acre fire service helispot (Planning Area 24). A helispot provides a
location for firefighting helicopters to land and fill with water or fuel during emergency situations.'
SCHOOLS
State law permits the imposition of school fees to be paid upon the issuance of building permits.
At the time of the adoption of the Findings, state law caps the fees at $2.24 per square foot of
new residential construction. The Moorpark Unified School District (School District) estimates
that under the current fee program, the Project would pay $14,044,800 in school fees. The
Developer has entered into a Memorandum of Understanding (MOU) with the School District
committing the Developer and the School District to establish a Community Facilities District
(CFD) on the Property to generate $76,610,000 (2005 dollars) for the purposes of school facility
construction or $68,565,220 more than required by state law. The Project also provides for the
conveyance of an18 -acre school site to the School District.
MOORPARK COLLEGE OBSERVATORY
As part of the build -out of the Specific Plan, the Moorpark College Observatory would be
relocated from its existing on- campus location to a specified location within the Nature Preserve.
4.0 CONCLUSION
In light of the foregoing, and in recognition of additional information contained within the Final
Program EIR and other portions of the Project record, the City of Moorpark City Council
concludes that implementation of the Project will result in the development of a beneficial project
that will (i) expand the City's public open space and recreational facilities; (ii) facilitate the City's
goal of providing new housing opportunities; (iii) improve the local transportation system; and
(iv) provide for schools, parks, and other public infrastructure improvements beyond that
required by the Mitigation Program. The City Council further concludes that these benefits
S:ICommunity Developmen6DEV PMMS P11 -North Park Environmenta11050512 Draft Findings.doc 4
0n� �.�3
North Park Village and Nature Preserve Specific Plan
Final Program EIR No. 2001 -01
Draft Statement of Overriding Considerations
outweigh the significant, unavoidable environmental impacts associated with development of the
Project and, accordingly, adopts this Statement of Overriding Considerations.
S:1Community DevelopmenADEV PMTSI S P111 -North ParklEnvironmentaA050512 Draft Findings.doc
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring and Reporting Program
ATTACHMENT B
MITIGATION MONITORING AND REPORTING PROGRAM
NORTH PARK VILLAGE AND NATURE PRESERVE
SPECIFIC PLAN NO. 2001 -01 PROJECT
INTRODUCTION
In accordance with the requirements of the California Public Resources Code §21081.6, and as
part of its certification of the adequacy of the Final Program Environmental Impact Report (EIR)
for the North Park Village and Nature Preserve Specific Plan No. 2001 -01 project, the City
Council of the City of Moorpark adopts the following "Mitigation Monitoring and Reporting
Program" (MMRP), which contains the mitigation program that has been incorporated through
preparation of the Program EIR with additional mitigation measures and modified measures
resulting from one of the following: (1) the applicant proposed an alternative or additional
method to mitigate an impact; (2) the City requested additional mitigation of an impact; or
(3) additional or modified measures were added in response to public comments. These
additional measures have been analyzed and are not expected to create any additional
significant impacts, but will lessen impacts anticipated to occur with implementation of the
project.
The MMRP includes Project Design Features, Standard Conditions and Requirement, and
Mitigation Measures, all of which have been identified measures to reduce potential adverse
environmental impacts. These three components of the mitigation program are described
below.
Project Design Features— Project Design Features are specific design elements proposed by
the project applicant which have been incorporated into the project to prevent the occurrence of
or reduce the significance of potential environmental effects. Because project design features
are incorporated into the project, they do not constitute mitigation measures as defined by
CEQA. However, without their implementation, significant impacts could occur. As such, they
are identified in the MMRP to ensure that they are developed and implemented as a part of the
project.
Standard Conditions and Requirements— Standard conditions and requirements are based on
local, state, or federal regulations or laws that are frequently required independently of CEQA
review, but can also serve to offset or prevent specific impacts. Typical standard conditions and
requirements include compliance with the Uniform Building Code, Ventura County Air Pollution
Control District permit requirements, etc. Additional conditions may be imposed on the project
by government agencies during the approval process, as appropriate. The applicability of many
of the standard conditions and requirements to the project would be finally determined at later
phases of project approval in association with subsequent discretionary and administrative
approvals.
Mitigation Measures —Where a potentially significant environmental effect has been identified
and is not reduced to a level considered less than significant through the application of Project
Design Features and /or Standard Conditions and Requirements, project- specific mitigation
measures have been identified.
The City Council of the City of Moorpark adopts this MMRP in its capacity as the lead agency
for certification of the North Park Village and Nature Preserve Specific Plan No. 2001 -01 Final
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmenta1\050512 MMRP Front.doc
.ice 3 .1
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring and Reporting Program
Program EIR in accordance with the provisions of the California Environmental Quality Act
( "CEQA ") (Cal. Pub. Res. Code § §21000, et seq.) and its implementing guidelines (14 Cal.Code
Regs. § §15000, et seq.) (the "CEQA Guidelines ").
The principal purpose of the MMRP is to ensure that the Council- approved mitigation measures
for the approved project are implemented and monitored for compliance during subsequent
planning stages and, ultimately, during project implementation. In general, the City of Moorpark
is responsible for overseeing implementation and completion of the adopted mitigation
measures. This includes the review of all monitoring reports, enforcement actions, and
document disposition, unless otherwise noted in the attached MMRP table. If an adopted
mitigation measure is not being properly implemented, the designated monitoring personnel
shall require corrective actions to ensure adequate implementation.
MITIGATION MONITORING AND REPORTING PROGRAM
The MMRP is provided in tabular format to facilitate effective tracking and documentation of the
status of mitigation measures. The attached MMRP table provides the following monitoring
information:
• Mitigation Measure -A list or inventory of all the adopted mitigation measures (inclusive
of Project Design Features, Standard Conditions and Requirements, and Mitigation
Measures) for the project from the Final Program EIR, as revised or otherwise modified
in the comments and responses to the Program EIR, applicant proposed modifications,
or at hearings before the City of Moorpark Planning Commission or the City Council.
• Timing of Verification -The appropriate time or phase for the implementation of each
mitigation measure.
• Responsible Party -The City Department or Departments responsible for overseeing the
implementation and completion of each mitigation measure. Where consultation with
other agencies is required, this requirement is noted. However, the responsibility to
determine compliance with the mitigation measure lies with the City of Moorpark, as the
lead agency for the project.
• Monitoring Action - Identifies the method by which the adopted measure will be initiated
by the applicant. Satisfactory completion of the measure will be verified by the
Responsible Party.
SACommunity Development\DEV PMTS\S P \11 -North Park \Environmental \050512 MMRP Front.doc
'.J L' . %-I Kra
C
0
f�
ff�
W
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
3.1 Land Use and Related Planning Programs
Project Design Features
• A graded site and access road will be provided for the future
501St building permit will
Applicant, City Engineer
Review of plans, site
relocation of the Moorpark College Observatory to the North Park
not be issued until
inspection
Nature Preserve.
graded site and access
road have been
completed to the
satisfaction of the City.
Standard Conditions and Requirements
• Consistent with the City of Moorpark General Plan Housing
The first final map will
City of Moorpark and
Execution of agreement
Element, the tentative map shall be subject to execution of an
not be approved without
Applicant/Community
Affordable Housing Agreement between the City of Moorpark and
an executed Affordable
Development Director
the applicant or developer. The Affordable Housing Agreement
Housing Agreement
shall set forth the procedure for meeting an affordable housing
requirement of 10 percent of the total number of approved dwelling
units. The Agreement may be part of a Development Agreement.
Execution of the Affordable Housing Agreement is required prior to
first final map approval.
• Prior to approval of the first residential unit building permit, the
Prior to issuance of first
Applicant
Receipt of fees, dedication of
subdivider shall pay fees, dedicate land, and /or make
residential unit building
land and /or completion of
improvements in accordance with Section 8297 -4 of the City's
permit
improvements
Subdivision Ordinance (Parks and Recreation Facilities).
Mitigation Measures
1. The project applicant shall prepare a home buyer notification
Package: Prior to
Applicant, Community
Review of notification
package that contains a description and accompanying maps
recordation of the first
Development Director
package by Community
showing the adopted land use plans for the North Park Specific
tract map
Development Director
Plan and surrounding areas, including the existence of grazing and
agricultural activities and mineral rights (oil extraction) on and /or
adjacent to the Specific Plan site. Each homeowner shall be
required to affirm, by signature, that he /she is aware of the existing
and future development plans onsite and in the surrounding area,
and that he /she acknowledges the right of property owners to
continue grazing and agricultural activities and mineral extraction
operations to the extent allowed under applicable permits. The
contents of the notification package shall be reviewed and
approved by the Community Development Director prior to the
recordation of the first tract map.
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmenta1\050512 Draft Mit Mon Program.doc
Mitigation Monitoring Program
Cy
f�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
The project applicant shall provide a 200 - foot -wide minimum width
Setback: Prior to
Applicant, Community
Review of Tentative Tract
setback from any residential structure adjacent to any onsite or
approval of Tentative
Development Director
Map conditions
offsite agricultural or grazing operations to reduce the effects of
Tract Map
impacts including spraying of pesticides over the adjacent
agricultural operation, noise, dust, etc. This required setback shall
be incorporated into the Specific Plan and shall be applicable until
such time that onsite or offsite agricultural or grazing uses either
cease or are converted or developed as a non - agricultural use.
2. All oil and gas wells, the injector well, and the tank farm facility
Prior to issuance of
Applicant, Community
Review of plans, site
within the boundaries of the Specific Plan site (not terminated
grading permit
Development Director
inspection
pursuant to State regulations) shall be enclosed by a six - foot -high
masonry wall with secured gates to prohibit access to the extraction
facilities by any persons other than authorized personnel, visually
screen the facilities from adjacent uses, and mitigate noise. This
requirement applies to facilities that would remain in operation after
implementation of the Specific Plan project. The proposed walls,
including elevations, building materials, landscape materials, and
means of access to the facilities shall be submitted to the
Community Development Director for review and approval prior to
the issuance of a grading permit for any sensitive land use within
800 feet of these uses.
3. Prior to the recordation of the first final map, the project applicant
Prior to recordation of
Applicant, City of Moorpark,
Approval of agreement
shall provide the City of Moorpark Community Development
first final map
Ventura County Community
Director with a written agreement between Ventura Community
College District
College District, the City of Moorpark, and the project applicant that
an alternative future parking site acceptable to Moorpark College
and the City of Moorpark has been identified to provide parking that
would be precluded by implementation of the North Park Specific
Plan project, as well as additional students generated by the
project.
4. Implementation of the SR -118 interchange and access road would
Prior to issuance of
Applicant, City of Moorpark
Completion of transfer of
require either an easement over land owned by Waste
grading permit for the
property
Management or the acquisition of the property owned by Waste
first phase of the project
Management. Should the project applicant be unable to directly
purchase from Waste Management the right -of -way necessary to
construct access road from the proposed Moorpark College SR -118
interchange to the North Park Specific Plan site, the City of
Moorpark may acquire, at the developer's expense, including all
City costs, all needed right -of -way at fair market value in
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc
Mitigation Monitoring Program
f�
\,r 1
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
compliance with California Code of Civil Procedures § §1230.010
regarding eminent domain. Nothing in this condition compels the
City to complete the eminent domain process if in the sole and
unfettered judgment of the City condemnation of the access right of
way is not in the public's interest. A decision by the City not to
complete the eminent domain process shall not relieve the
applicant from the requirement to construct the interchange and
connecting road and does not constitute a waiver of the offsite
condition pursuant to California Code of Civil Procedures
§§1230.010.
3.2 Aesthetics and Visual Resources
Project Design Features
• To the extent allowable by other agencies, all infrastructure shall be
Prior to issuance of
Applicant, Community
Review of plans, site
placed below grade to avoid visually prominent facilities.
permits for
Development Director,
inspection
infrastructure
Public Works Director, City
improvements
Engineer
• No new oil exploration or drilling would be permitted in development
Prior to issuance of
Applicant, City Engineer,
Receipt of abandonment
areas on the Specific Plan site. Existing wells in development
grading permits for
and California Division of
completion letter from
areas will be capped.
development where
Oil, Gas, and Geothermal
DOGGR
existing wells are
Resources ( DOGGR)
located
Standard Conditions and Requirements
• The Community Development Director and City Engineer shall
Prior to issuance of
Applicant, Community
Review of plans, site
review and approve the project's conformance with contour grading
grading permit
Development Director, City
inspection
concept design consistent with recommendations in the City's
Engineer
Hillside Management Ordinance and City Council Resolution No.
2000 -1874. Grading permits shall not be issued until 40 -scale
grading plans have been developed that incorporate contour
grading techniques. The project shall be constructed in accordance
with approved grading plans.
• All commercial, industrial, institutional, and multi - family residential
Prior to issuance of
Applicant, Community
Review of plans
projects shall have the lighting system and its components
building permits
Development Director, City
incorporated into the project and approved by the City of Moorpark
Lighting Engineer
Lighting Engineer prior to the issuance of a building permit for the
project. Each lighting plan shall incorporate electrical plans and
structural plans which detail the provision of lighting systems for
exteriors of all buildings, parking lots, loading areas, walkways,
public use areas, public art displays, fountains, or landscape areas
S: \Community Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc
Mitigation Monitoring Program
C
C3
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
(source: Moorpark Municipal Code §17.30.060).
• All lighting along the perimeter of natural areas, particularly street
Prior to issuance of
Applicant, Community
Review of plans, site
lights, shall be downcast luminaries and shall be shielded and
building permits
Development Director, City
Inspection
oriented in a manner that will prevent spillage or glare into the
Lighting Engineer
remaining natural and open space areas. Final lighting orientation
and design shall be to the satisfaction of the City Engineer and
Director of Community Development. All lighting proposed shall be
consistent with Chapter 17.30 of the Municipal Code.
• Prior to final inspection or issuance of a certificate of occupancy,
Prior to final inspection
Applicant, Community
Site Inspection
where applicable, the City of Moorpark Lighting Engineer shall
or issuance of a
Development Director, City
cause to be performed a photometric field inspection of the
certificate of occupancy
Lighting Engineer
approved lighting system for the project. The inspection shall verify
the proper construction and installation of materials within the
approved plan, determine the actual light patterns and values
through light meter testing and observation, and determine the
extent of any errant lighting. Deviations and /or violations shall be
corrected prior to the final clearance for the project (source:
Moorpark Municipal Code §17.30.080; Ord. 266 §2 (part), 1999).
• Prior to the issuance of a Zoning Clearance for grading, the
Prior to the issuance of
Applicant, City Landscape
Review of plans, site
applicant shall submit a complete Landscape Plan, together with
a Zoning Clearance for
Architect consultant,
inspection; if installed
specifications and a separate Maintenance Plan. The Landscape
grading permit or first
Community Development
landscaped is not in
Plan shall encompass all areas required to be planted consistent
Final Map, whichever
Director
compliance with the
with the conditions of approval and the adopted Mitigation
comes first
Landscape Plan, issuance of
Monitoring and Reporting Program and shall incorporate the
subsequent building permits
recommendations of the biological resources mitigation program
will be withheld
and Fire Hazard Reduction Program. The Landscape Plan shall be
reviewed by the City of Moorpark Landscape Architect consultant
and approved by the Community Development Director prior to
Zoning Clearance for grading permit, or first Final Map approval,
whichever occurs first.
Mitigation Measures
1. Prior to the approval of any final tract maps, a detailed landscape
Prior to the approval of
Applicant, Restoration
Review of plans, site
plan shall be reviewed and approved by the City of Moorpark
any final tract maps.
Ecologist or Licensed
inspection; if installed
Community Development Department. The plan shall be prepared
Landscape Architect,
landscaped is not in
and certified by a restoration ecologist or licensed landscape
Community Development
compliance with the
architect with expertise in native plant materials and habitat
Director
Landscape Plan, issuance of
restoration, and shall comply with Community Development
subsequent building permits
standard plans, adopted planned community regulations, and
or release of improvement
Standard Conditions of Approval.
bonds will be withheld at the
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc
Mitigation Monitoring Program
C
f�
C3
�1
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
discretion of the Community
Development Director until
corrections are made
2. All concrete structures, such as drainage ditches, detention basins,
Prior to completion of
Applicant, Community
Review of plans, site
rip -rap, crib walls, swales, or curbs, located in natural areas shall
grading.
Development Director, City
inspection; if installed
be constructed with colored concrete to blend with the surrounding
Engineer
incorrectly, issuance of
terrain.
subsequent building permits
or release of improvement
bonds will be withheld at the
discretion of the Community
Development Director until
corrections are made
3. Above -grade infrastructure such as water tanks, water lines, etc.
Prior to issuance of
Community Development
Review of plans, site
shall be painted with a color approved by the City of Moorpark
building permit
Director, County of Ventura
inspection; if installed
Community Development Department and the County of Ventura
Water and Sanitation
incorrectly, issuance of
Water and Sanitation Services Division so as to blend in with
Services Division
subsequent building permits
surrounding terrain. Landscaped berms shall be provided around
or release of improvement
the tanks to further screen the view of the tanks from surrounding
bonds will be withheld at the
areas, as determined necessary by the Community Development
discretion of the Community
Director.
Development Director until
corrections are made
3.3 Transportation and Circulation
Project Design Features
• E Street will be constructed as a two -lane collector road east from
Surety in an amount
Applicant, Community
Review of plans, site
Collins Drive /Campus Road to provide access to the Specific Plan
and form satisfactory to
Development Director, City
inspection
site.
the City sufficient to
Engineer
ensure the timely
completion of the
improvement shall be a
condition of the
approval of the
applicable improvement
plans.
• Moorpark College Road will be constructed north from SR -118 to
Surety in an amount
Applicant, Community
Review of plans, site
the Specific Plan site as a four -lane arterial. This roadway will not
and form satisfactory to
Development Director, City
inspection
be constructed without the prior approval of a new SR -118
the City sufficient to
Engineer, California
interchange.
ensure the timely
Department of
completion of the
Transportation
improvement shall be a
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc
Mitigation Monitoring Program
f�
�3
C�?
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
condition of the
approval of the
applicable improvement
plans.
• No vegetation in the Buildout Area (Phases B and C) shall be
As specified in Project
Applicant, Community
Receipt of information by
removed and no land within the grading limits of Buildout shall be
Design Feature
Development Director, City
Community Development
graded until the construction of the proposed interchange at
Engineer, California
Director to support findings
SR -118, referred to in this Program EIR as the Moorpark College
Department of
Interchange at SR -118 and the roadway connecting the
Transportation
interchange to the Specific Plan site, referred to in this Program
EIR as Moorpark College Road is: 1) fully permitted; 2) fully funded
to ensure completion; 3) at a point of construction with completed
and approved work representing at least 50 percent of budgeted
construction costs; and 4) not more than 12 months from expected
completion as determined by the City of Moorpark Community
Development Director. This provision does not apply to vegetation
removal or grading necessary for soils testing and archeological
resources testing. The interchange and access roadway must be
fully complete and accepted by the City of Moorpark and Caltrans
prior to the issuance of any building permits for Phases B or C.
Standard Conditions and Requirements
• For all residential, commercial, and industrial entitlement permits,
Prior to Planned
Applicant
Review of plans, site
the applicant shall provide, where feasible and appropriate:
Development permit
inspection
approval
A. Transit stop improvements, including but not limited to bus
pullouts, bus pads or shelters, as required by the decision -
making body or other agency.
B. Safe and convenient access for pedestrians and bicyclists from
the external circulation system to onsite buildings or internal
street/sidewalks (source: Moorpark Municipal Code
§ 17.48.010 ).
• As a condition of the issuance of a building permit for each
Prior to issuance of
Applicant
Receipt of fees
residential unit, the developer shall pay the City of Moorpark, a
each building permit
traffic mitigation fee as described herein ( "Citywide Traffic Fee ").
The Citywide Traffic Fee may be expended by City in its sole and
unfettered discretion.
• Prior to issuance of a building permit, the developer shall pay to the
Prior to issuance of
Applicant, Community
Receipt of fees
City of Moorpark the Area of Contribution (AOC) Fees for Los
building permits
Development Director, City
S: \Community Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc
Mitigation Monitoring Program
f�
W
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
Angeles Avenue AOC. The developer shall also contribute to any
Engineer
cumulative traffic fee program adopted by the City prior to issuance
of the first residential building permit for the project. AOC fees shall
be those that are in effect at the time of building permit issuance.
In addition to the AOC fees, the developer shall be required to
make similar pro -rata contributions to any other traffic mitigation
related pre - construction impact fees approved by the City Council
to offset the long -term effects on the City's street system. If the
residential portion of the project is constructed prior to any such
additional mitigation fee programs being adopted, for impacts to
intersections outside of the Los Angeles Avenue Area of
Contribution, a proportionate share of future improvement costs
shall be collected for locations where project traffic has a
measurable effect on cumulative traffic volumes. The City Traffic
Engineer and Community Development Director shall determine the
required contributions prior to issuance of building permits. Fees
shall be paid prior to the issuance of these permits.
• The applicant of the North Park Specific Plan project shall pay
Prior to issuance of
Applicant
Receipt of fees
County of Ventura Traffic Impact Mitigation Fees to fund roadway
building permits
and highway improvements on County facilities resulting in
significant impacts to roadways in unincorporated Ventura County.
The Specific Plan site is located within County Land Use District 4.
Mitigation Measures
1. The proposed Specific Plan has identified improvements at the
A.) Obtain permits and
Applicant, Community
Review of plans, site
intersection of Campus Park Drive and Collins Drive to alleviate
provide surety for
Development Director, City
inspection
congestion under short-range conditions due to background traffic
completion: Prior to
Engineer
as well as project traffic. To mitigate the impacts of construction
issuance of grading
traffic on the intersection of Campus Park Drive at Collins Drive, the
permits (except for
planned improvement shall be completed prior to the construction
grading associated with
of the Specific Plan.
new interchange and
access rd.)
B.) Complete
improvements: Prior to
issuance of building
permit for first
residential unit.
2. Prior to the issuance of the first grading permit, a traffic
Prior to issuance of the
Applicant, Community
Review of plans, observation
management and construction materials delivery plan shall be
first grading permit
Development Director, City
of grading and construction
prepared by the applicant and approved by the City Engineer and
Engineer
activities
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc
Mitigation Monitoring Program
C�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(lies)
Monitoring Action
Community Development Director to monitor construction traffic
and ensure that there are no additional impacts at the intersections
along Collins Drive or anywhere else. The traffic management and
construction materials delivery plan shall identify options for the
construction - related access to the Specific Plan site including the
use of Collins Drive and /or an access easement over Unocal
property at the eastern end of Campus Park Drive, and details
about the number of workers and their scheduling based on the
phasing of the construction. The traffic management and
construction materials delivery plan shall include details about the
number of workers and their scheduling based on the phasing of
the construction. The traffic management plan can include
incentives offered to workers who carpool or vanpool, or satellite
offsite parking lots can construction traffic and its impacts along
Collins Drive. The traffic management plan is required to mitigate
any and all construction traffic impacts.
3. The project applicant shall fund its pro -rata share of the costs of
Prior to issuance of first
Applicant, Community
Receipt of fees
improvements to the City of Moorpark intersections indicated in
grading permit for each
Development Director, City
Table 3.3 -26.
phase
Engineer
4. The project applicant shall fund its pro -rata share of the costs of
Prior to issuance of first
Applicant, Moorpark
Receipt of fees
improvements to the City of Moorpark intersections indicated in
grading permit for each
Community Development
Table 3.3 -27.
phase
Director, and Moorpark City
Engineer
3.4 Air Quality
Standard Conditions and Requirements
• All construction contractors shall comply with Ventura County Air
During all grading and
Applicant, City Engineer,
Observation of grading and
Pollution Control District (VCAPCD) regulations, including Rule 51
construction activities
Building Official
construction activities
(nuisance). The applicant shall comply with the following directives
for controlling fugitive dust emissions from grading and excavation:
a) During clearing, grading, earth moving, or excavation
operations regular watering shall control dust. In addition the
following measures shall apply:
1. The area disturbed by clearing, grading, earth moving, or
excavation operations shall be minimized to prevent
excessive dust generation.
2. All trucks shall be required to cover their loads as required
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 10
Mitigation Monitoring Program
C�
C
F�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
by California Vehicle Code §23114.
3. All graded and excavated material, exposed soil areas,
and active portions of the construction site, including
unpaved on -site roadways, shall be treated to prevent
fugitive dust. Treatment shall include, but not necessarily
be limited to, periodic watering, application of
environmentally -safe soil stabilization materials, and /or
roll- compaction as appropriate. Watering shall be done as
often as necessary and reclaimed water shall be used
whenever possible.
4. Signs shall be posted on -site limiting traffic to 15 miles per
hour or less.
5. Adjacent streets and roads shall be swept at least once
per day, preferably at the end of the day, if visible soil
material is carried over to adjacent streets and roads.
6. Water all site access roads and material excavated or
graded onsite or offsite to prevent excessive amounts of
dust. Watering shall occur a minimum of at least two
times daily, preferably in the late morning and after the
completion of work for the day. Additional watering for
dust control shall occur as directed by the City.
Application of water (preferably reclaimed, if available)
should penetrate sufficiently to minimize fugitive dust
during grading activities. The grading plan shall indicate
the number of water trucks that will be available for dust
control at each phase of grading.
7. Cease all clearing, grading, earthmoving, or excavation
operations during periods of high winds (greater than 15
mph averaged over one hour). The contractor shall
maintain contact with the Ventura County Air Pollution
Control District (VCAPCD) meteorologist for current
information about average wind speeds. Water or
securely cover all material transported offsite and onsite to
prevent excessive amounts of dust.
8. Keep all grading and construction equipment on or near
the site until these activities are completed.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 11
Mitigation Monitoring Program
C
f�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
9. All employees involved in grading or excavation
operations during dry periods shall use facemasks to
reduce inhalation of dust.
10. Wash off heavy -duty construction vehicles before they
leave the site. During clearing, grading, earthmoving or
excavation operations regular watering shall control
dust. Water all site access roads and material
excavated or graded onsite or offsite to prevent
excessive amounts of dust. Watering shall occur a
minimum of two times daily, preferably in the late
morning and after the completion of work for the day.
Additional watering for dust control shall occur as
directed by the City. The grading plan shall indicate the
number of water trucks that will be available for dust
control at each phase of grading.
b) After clearing, grading, earthmoving, or excavation operations,
and during construction activities, fugitive dust emissions
should be controlled using the following procedures:
1. Apply non - hazardous chemical stabilizers to all inactive
portions of the construction site. When appropriate, seed
exposed surfaces with a fast growing, soil binding plant to
reduce wind erosion and its contribution to local particulate
levels.
2. Periodically, or as directed by the City Engineer, sweep
public streets in the vicinity of the site to remove silt (i.e.,
fine earth material transported from the site by wind,
vehicular activities, water runoff, etc.), which may have
accumulated from construction activities.
3. During smog season (May through October), the City shall
order that construction cease during Stage III alerts to
minimize the number of vehicles and equipment operating,
lower ozone levels and protect equipment operators from
excessive smog levels. The City, at its discretion, may
also limit construction during Stage II alerts.
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 12
Mitigation Monitoring Program
C�
E�
k, s
W
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
4. Graded and /or excavated inactive areas of the
construction site shall be monitored by the City Engineer
at least weekly for dust stabilization. Soil stabilization
methods, such as water and roll- compaction, and
environmentally -safe dust control materials, shall be
periodically applied to portions of the construction site that
are inactive for over four days. Upon completion of
grading and excavation operations within an area, the
area shall be seeded and watered until ground cover
growth is evident, or periodically treated with
environmentally -safe dust suppressants, to prevent
excessive fugitive dust.
c) The following fugitive dust control measures recommended by
the VCAPCD shall be evaluated by the City and by the
applicant and shall be implemented if they are found feasible
and have not already been incorporated in the preceding
mitigation measures:
1. Dust control requirements shall be shown on all grading
plans.
2. All trucks shall be required to cover their loads as required
by California Vehicle Code §23114.
3. Signs shall be posted onsite limiting vehicle speed to 15
miles per hour or less.
4. All site access roads shall be paved at least 100 feet from
the main road.
5. There shall be at least one qualified and authorized
person onsite each work day to enforce the provisions of
the Fugitive Dust Mitigation Plan and any other applicable
fugitive rules, ordinances, or conditions.
6. Personnel involved in grading operations should be
advised to wear respiratory protection in accordance with
California Division of Occupational Safety and Health
regulations.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 13
Mitigation Monitoring Program
f�
}r=
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
7. All project construction operations shall be conducted in
compliance with all applicable Ventura County Air
Pollution Control District Rules and Regulations with
emphasis on Rule 50 (Opacity) and Rule 51 (Nuisance).
• The applicant shall comply with the following measures, as feasible,
During all grading and
Applicant, City Engineer,
Observation of grading and
to reduce NOx and ROC from heavy equipment as recommended
construction activities
Building Official
construction activities
by the Ventura County Air Pollution Control District in its Ventura
County Air Quality Assessment Guidelines.
a) Minimize equipment idling time. Turn equipment off when not
in use for more than five minutes.
b) Maintain equipment engines in good condition and in proper
tune as per manufacturers' specifications.
c) Lengthen the construction period during smog season (May
through October) to minimize the number of vehicles and
equipment operating at the same time.
d) Use alternatively fueled construction equipment, such as
compressed natural gas (CNG), liquefied natural gas (LNG), or
electric, if feasible.
• Comply with all applicable provisions of the City of Moorpark's
Transportation Demand Management ordinance.
Mitigation Measures
1. In order to reduce diesel fuel engine emissions, the project
Prior to issuance of
Applicant, City Engineer
Review of specifications
applicant shall require that all construction bid packages include a
grading permit
separate "Diesel Fuel Reduction Plan." This plan shall identify the
actions to be taken to reduce diesel fuel emissions during
construction activities (inclusive of grading and excavation
activities). Reductions in diesel fuel emissions can be achieved by
measures including, but not limited to, the following: a) use of
alternative energy sources, such as compressed natural gas or
liquefied petroleum gas, in mobile equipment and vehicles; b) use
of "retrofit technology," including diesel particulate trips, on existing
diesel engines and vehicles; and c) other appropriate measures.
Prior to the issuance of a grading permit, the Diesel Fuel Reduction
Plan shall be filed with the City of Moorpark Community
Development Department. The Diesel Fuel Reduction Plan shall
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Mit Mon Program.doc 14
Mitigation Monitoring Program
ps
Ll
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
include the following provisions:
a. All diesel fueled off -road construction equipment shall be
California Air Resources Board (CARE) certified or use post -
combustion controls that reduce pollutant emissions to the
same level as CARB certified equipment. CARB certified off -
road engines are engines that are three years old or less and
comply with lower emission standards. Post - combustion
controls are devices that are installed downstream of the
engine on the tailpipe to treat the exhaust. These devices are
now widely used on construction equipment and are capable of
removing over 90 percent of the PM10, carbon monoxide, and
volatile organic compounds from engine exhaust, depending
on the specific device, sulfur content of the fuel, and specific
engine. The most common and widely used post- combustion
control devices are particulate traps (i.e., soot filters), oxidation
catalysts, and combinations thereof.
b. All diesel fueled on -road construction vehicles shall meet the
emission standards applicable to the most current year to the
greatest extent possible. To achieve this standard, new
vehicles shall be used or older vehicles shall use post -
cdmbustion controls that reduce pollutant emissions to the
greatest extent feasible.
c. The effectiveness of the latest diesel emission controls is
highly dependant on the sulfur content of the fuel. Therefore,
diesel fuel used by on -road and off -road construction
equipment shall be low sulfur ( >15 ppm) or other alternative
low polluting diesel fuel formulation such as PurINOxTM or
Amber363. Low sulfur diesel fuel shall be required by existing
regulations after the year 2007 and it is already being
produced and sold as the regulation is phased in.
2. Prior to the issuance of a building permit for the construction for
Prior to issuance of a
Applicant, Community
Receipt of fees
each residential unit and the commercial center, the developer shall
building permit for each
Development Director
make a contribution to the Moorpark Traffic Systems Management
residential unit and the
(TSM) Fund to fund TSM programs or clean -fuel vehicles
commercial center
programs, as determined by the City of Moorpark using the latest
URBEMIS program for reactive organic compounds or nitrogen
oxide emissions in excess of the daily threshold over a three -year
period from Buildout. Fees shall be assessed in accordance with
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 15
Mitigation Monitoring Program
b
C�
f�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
the Ventura County Air Pollution Control District Assessment
Guidelines.
3. Prior to the issuance of the first building permit, the applicant shall
Prior to issuance of the
Applicant, Community
Review of energy calculations
demonstrate to the City of Moorpark that all North Park Specific
first building permit
Development Director,
Plan structures have been designed and shall be constructed to be
Building Official
at least 20 percent more energy efficient than required by the
energy efficiency standards of the State Building Code, Title 24,
California Code of Regulations, Part 6— California Energy Efficiency
Standards for Residential and Nonresidential Buildings).
3.5 Noise
Standard Conditions and Requirements
• Construction activities shall be limited to between 7:00 a.m. and
During all grading and
Applicant
Observation of grading and
7:00 p.m., Monday through Saturday. Construction work on
construction activities
construction activities
Saturdays will require payment of a premium for City inspection
services, and may be further restricted or prohibited should the City
receive complaints from adjacent property owners. No construction
work is to be done on Sundays, and City observed holidays
pursuant to Section 15.26.010 of the Municipal Code.
Mitigation Measures
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 16
Mitigation Monitoring Program
C
C
Fa
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
1. The developer shall ensure that construction equipment is fitted
During all grading and
Applicant, City Engineer,
Observation of grading and
with modern sound reduction equipment.
construction activities
Building Official
construction activities
a) Stationary noise sources that exceed 70 dBA of continuous
1c. Provision of copies of
noise generation (at 50 feet) shall be shielded with temporary
communication materials
barriers if existing residences are within 350 feet of the noise
and return receipts to the
source.
City Engineer
b) Designated parking areas for construction worker vehicles and
1 d.Acceptance of construction
for materials storage and assembly shall be provided. These
effects mitigation program
areas shall be set back as far as possible from or otherwise
by City
shielded from existing surrounding rural residential
neighborhoods.
c) Immediately surrounding property owners shall be notified in
writing on a monthly basis of construction schedules involving
major grading, including when clearing and grading is to begin.
The project developer shall notify adjacent residents and
property owners by Certified Mail- Return Receipt Requested,
of the starting date for removal of vegetation and
commencement of site grading. The content of this required
communication shall be approved by the City Engineer in
advance of its mailing and the return receipts, evidencing
United States mail delivery, shall be provided to the
Engineering Department.
d) A construction effects mitigation program shall be prepared
and submitted to the City after completion and occupancy of
the first phase of project development. This program shall
protect, to the degree feasible, new residents from the impacts
of sustained construction noise on new neighborhoods.
2. When final grading plans become available and prior to grading
Prior to issuance of
Applicant, Acoustical
Review of plans
permit issuance, an acoustical analysis shall be performed to
grading permits
Engineer, Community
determine the exact height and location of barriers required to meet
Development Director
the City exterior noise standards. This analysis shall be prepared
by a qualified acoustical engineer and be reviewed and approved
by the City prior to permit issuance. A wall with a maximum height
of 6.5 feet would reduce traffic noise levels to below 65 CNEL for
homes along a roadway. Homes may be required to provide
approximately 25 dB of outdoor -to- indoor noise reduction. With
typical residential construction, at least 20 dB of outdoor -to- indoor
noise reduction is achieved with windows closed. Air conditioning
►. 33 SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Mil Mon Program.doc 17 Mitigation Monitoring Program
�T
C�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
of residential units provides adequate ventilation to assume that
windows remain closed. With additional building upgrades,
outdoor -to- indoor noise reductions of up to 32 dB can be achieved.
All residences would require less than 32 dB of outdoor -to- indoor
noise reduction.
3. At the time detailed architectural drawings become available and
Prior to issuance of
Applicant, Acoustical
Review of acoustical analysis
prior to building permit issuance, an acoustical analysis shall be
building permits
Engineer, Community
performed that outlines a program for implementation of the Noise
Development Director
Standard of 65 CNEL (Community Noise Equivalent Level) is
attained at all locations within the development. The City also
requires that interior noise levels attributable to exterior noise
sources not exceed 45 CNEL. The program shall specify any
upgrades to the standard construction required to meet the
standard. This analysis should be prepared by a qualified
acoustical engineer and be reviewed and approved by the City prior
to permit issuance.
4. The City of Moorpark Community Development Director shall
Prior to issuance of
Applicant, Acoustical
Review of proposed uses
review all uses to be located at the Neighborhood Commercial site.
building permits for
Engineer, Community
If the City determines that any proposed use will potentially exceed
tenant improvements
Development Director
the Noise Ordinance limits, an acoustical analysis shall be prepared
to ensure that the use does not violate the Noise Ordinance. The
analysis shall document the sources of noise generated by the use
and show compliance with the Noise Ordinance and any measures
required for compliance. This analysis shall be prepared by a
qualified acoustical engineer and be reviewed and approved by the
City of Moorpark Community Development Director prior to permit
issuance.
3.6 Biological Resources
Project Design Features
• Open Space Nature Preserve. This project design feature would
Prior to issuance of the
Applicant, Community
Acceptance of dedication
offset the impacts on coastal sage scrub vegetation and native
first grading permit in
Development Director
grassland vegetation. Approximately 2,121 acres of the site will be
each phase or
preserved in the Natural Preserve. Table 3.6 -5 of the Final
recording of the Final
Program EIR lists the acres of habitat located within the Natural
Map, whichever comes
Preserve.
first, 707 acres of the
Nature Preserve will be
Uses within the Natural Preserve are proposed to be limited to the
dedicated to the City.
following: biological and cultural research, education, management,
revegetation, restoration, and enhancement, astronomical
SACommunity Development \DEV PMTS \S P\11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 18
Mitigation Monitoring Program
/- 33
W
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
observatory, all oil and gas activities within the easements and
quitclaims granted prior to the enactment of the Specific Plan, and
hiking trails and utility and water transmission lines necessary to
connect permitted public or quasi - public facility uses to adjust
development.
• A Conservation Organization shall be chosen by the City of
Prior to issuance of first
Applicant, Community
Acceptance of a conservation
Moorpark (in coordination with U.S. Fish and Wildlife Service and
grading permit
Development Director, City
organization and funding
the California Department of Fish and Game if necessitated by any
Council
mechanism for the
regulatory permitting requirements) to manage the Nature
conservation organization
Preserve. The project applicant shall provide a mechanism (such
as a non - wasting endowment or landscape maintenance district)
acceptable to both the City and the Conservation Organization to
fund ongoing management costs of the Conservation Organization.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 19
Mitigation Monitoring Program
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
• Culverts with a minimum diameter of five feet shall be provided
Pre - Construction:
Applicant, Wildlife Biologist,
Review of plans, biological
under the access road connecting the Specific Plan site to the SR-
Surveys to establish a
Community Development
surveys
118 Moorpark College Interchange. In addition, an underpass shall
baseline from which
Director, City Engineer
be constructed under this access road approximately 500 feet
success can be
south of Hidden Creek Canyon. The east side of the underpass
measured during and
shall connect with an access road along which shall be placed
after construction shall
wildlife fencing. The wildlife fencing shall be placed along the west
be started at least one
side of the access road and guide wildlife to the underpass. The
year prior to issuance of
west side of the underpass shall open up immediately into natural
grading permits so that
open space. The bottom of the underpass shall have a natural
pre - construction data
substrate to facilitate wildlife movement. The dimensions of the
from each of the four
underpass shall meet the minimum requirements needed for mule
seasons will have been
deer to pass through. The opening (from one end of the underpass
collected.
to the other) shall be 0.9 or greater based on the following
mathematical formula: height times (width divided by length) equals
Construction:.
Ongoing observation and
0.9 or greater. Wildlife guzzlers shall be installed at the existing
reporting, along with
crossing of the SR -118 and near all new project culverts and
inspection of completed
underpasses selected for wildlife movement. A guzzler is an
improvements
underground water trap that provides a perennial source of water
for wildlife. Installation of these wildlife guzzlers near project
Post - Construction:
Review of monitoring reports
culverts encourages movement to and through these potentially
Monitoring shall consist
by the Community
new wildlife crossings. In addition, these guzzlers and project
of a minimum of six
Development Director and
culverts, including those under SR -118 and the underpass of the
surveys per each of the
modifications to wildlife
access road, will be monitored by a qualified wildlife biologist for
four seasons
crossings as determined
three years to document their effectiveness of use by wildlife
throughout the 3 -year
necessary by the Community
species. Monitoring methods shall include use of camera, track
post- construction
Development Director in
plates, or diatomaceous earth or other acceptable means to
monitoring program.
consultation with the wildlife
determine wildlife use at selected locations. A minimum of six
biologist.
surveys per each of the four seasons shall be conducted to
determine wildlife movement at the culverts under SR -118 and the
culverts and underpass under the access road to SR -118 shall be
conducted throughout the three -year monitoring program.
si
�r
L �
0 S1Community Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 20 Mitigation Monitoring Program
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
Reports shall be prepared and submitted to the City of Moorpark
Community Development Director and to any appropriate agency
on an annual basis. Each report shall include the findings of the
wildlife movement surveys and all pertinent details regarding
project design features intended for wildlife use. Based on the
findings of monitoring, recommendations to enhance wildlife
movement through SR -118 crossings or through the new culverts
and underpass of the access road that connects the Specific Plan
site with the interchange at SR -118 shall be provided as
appropriate (e.g., fencing modification, vegetation enhancement,
lighting adjustment, etc.).
Standard Conditions and Requirements
The applicant shall be required to obtain all Clean Water Act 401
Prior to issuance of any
Applicant, U.S. Army Corps
Receipt of applicable permits
and 404 permits and clearances as administered by the U.S. Army
grading permits
of Engineers, Regional
Corps of Engineers and the Regional Water Quality Control
Water Quality Control
Compliance with and
Board /State Water Resources Board. These permits shall be
Board, Community
successful implementation of
obtained prior to initiating any grading permits or clearing and
Development Director
measure(s) will be determined
grubbing activities not covered under the City's grading ordinance.
by the regulatory agencies
All conditions of the permits and certifications from these agencies
that are designed to minimize impacts to biological resources and
all measures to mitigate for the loss of jurisdictional habitats shall
be implemented. Implementation of mitigation designed to offset
impacts to areas of federal jurisdiction shall be monitored by the
relevant agencies and by the City (under the California
Environmental Quality Assurance Program) for the project.
Mitigation Measures
1. The impact to coastal sage scrub shall be mitigated at an acreage
Program: Prior to
Applicant, Biologist,
Review of revegetation
ratio of 2:1. Coastal sage scrub habitat shall be preserved onsite
issuance of first grading
Community Development
program
within the Nature Preserve as described in the Project Design
permit
Director
Features. As part of the project, 74.3 acres of coastal sage scrub
shall be restored in the Nature Preserve. The revegetation
program shall be developed by a qualified biologist and submitted
to the City of Moorpark Community Development Director for
review and approval prior to issuance of the first grading permit.
L1
t SACommunity Development \DEV PMTS \S P \11 -North Park\Environmenta1\050512 Draft Mit Mon Program.doc 21 Mitigation Monitoring Program
.,a
F�
tJ
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(lies)
Monitoring Action
Restoration shall consist of seeding with appropriate sage scrub
Restoration: As set
Applicant, Biologist,
Site inspection
species.
forth in mitigation
Community Development
measure
Director
A detailed conceptual mitigation plan shall be developed and
implemented and contain the following items:
a. Responsibilities and qualifications of the personnel to
implement and supervise the plan. The responsibilities of the
landowner, specialists, and maintenance personnel that will
supervise and implement the plan shall be specified.
b. Site selection. The site(s) for restoration shall be determined
in coordination with the project applicant, the City of Moorpark,
and the biologist. The site shall be located in the Nature
Preserve, and be contiguous with other natural open space
areas.
c. Site preparation and planting implementation. The site
preparation shall include: 1) protection of existing native
species, 2) trash and weed removal, 3) native species salvage
and reuse (i.e., duff), 4) soil treatments (i.e., imprinting,
decompacting), 5) erosion control measures (i.e., rice or willow
wattles), and 6) seed mix application.
d. Schedule. Site restoration shall be conducted between
October and January 30. Introduction of hydroseed mix and
container plants shall take place immediately after preparation
of the restoration sites.
e. Maintenance plan /guidelines. The maintenance plan shall
include: 1) weed control, 2) herbivory control, 3) trash removal,
4) irrigation system maintenance, 5) maintenance training, and
6) replacement planting.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Mit Mon Program.doc 22
Mitigation Monitoring Program
CA
C�
C�
f�
W
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
f. Monitoring Plan. The Monitoring Plan shall include:
Monitoring: Three to
Applicant, Biologist,
Ongoing observation and
1) qualitative monitoring (i.e., photographs and general
five years
Community Development
reporting
observations), 2) quantitative monitoring (i.e., randomly placed
Director
transects), 3) performance criteria as approved by the resource
Compliance with and
agencies, 4) monthly reports for the first year and bimonthly
successful implementation of
reports thereafter, and 5) annual reports which shall be
measure(s) will be determined
submitted to the resource agencies for three to five years. The
by the Community
monitoring shall be conducted for three to five years,
Development Director
depending upon the performance of the site and as approved
by the City's Community Development Director.
g. Long -term preservation. Long -term preservation of the site
shall be outlined in the conceptual mitigation plan to ensure the
mitigation is not impacted by future development.
h. Performance standards shall be in the conceptual plan and
apply to the revegetation of sage scrub. At a minimum in the
conceptual plan, revegetation shall be considered successful
at three to five years if the percent cover and species diversity
of the restored and /or created habitat areas are similar to
percent cover and species diversity of adjacent existing
habitats, as determined by quantitative testing of existing and
restored areas. If the performance standards are not met in
five years, the applicant shall meet with the City of Moorpark
and develop appropriate remedial measures for habitat loss.
The non - native species cover on the revegetation at the end of
the monitoring period shall be less than 10 percent.
In addition, earthmoving equipment shall avoid maneuvering in
areas outside the identified limits of grading in order to avoid
disturbing open spaces that will remain undeveloped. Prior to
grading, the natural open space limits shall be marked by the
construction supervisor and project biologist. These limited
shall be identified on the grading plan. The applicant shall
submit a letter to the City of Moorpark verifying that
construction limits have been flagged in the field. No
earthmoving equipment shall be allowed within the open space
areas without the approval of the project biologist and the City
of Moorpark.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 23
Mitigation Monitoring Program
C>
C
C:
f�
CI
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
2. Foothill needlegrass grassland shall be restored in the Nature
Program: Prior to
Applicant, Biologist,
Review of restoration program
Preserve at an acreage ratio of 2:1. The project requires 5.6 acres
issuance of first grading
Community Development
of foothill needlegrass grassland shall be restored in the Nature
permit
Director
Preserve. A native grass restoration program shall be developed
by a qualified biologist and submitted to the City of Moorpark
Community Development Director for review and approval prior to
issuance of the first grading permits. Restoration shall consist of
seeding with appropriate needlegrass species.
The conceptual mitigation plan shall be developed and
implemented and shall contain the following items:
a. Responsibilities and qualifications of the personnel to
implement and supervise the plan. The responsibilities of the
landowner, specialists, and maintenance personnel that will
supervise and implement that plan shall be specified.
b. Site selection. The site(s) for restoration shall be determined
Restoration: As set
Applicant, Biologist,
Site inspection
in coordination with the project applicant, the City of Moorpark,
forth in mitigation
Community Development
and the biologist. The site shall be located in the Nature
measure
Director
Preserve, and be contiguous with other natural open space
areas.
c. Site preparation and planting implementation. The site
preparation shall include: 1) protection of existing native
species, 2) trash and weed removal, 3) native species salvage
and reuse (i.e., duff), 4) soil treatments (i.e., imprinting,
decompacting), 5) erosion control measures (i.e., rice or willow
wattles), and 6) seed mix application.
d. Schedule. Site restoration shall be conducted between
October and January 30. Introduction of hydroseed mix and
container plants shall take place immediately after preparation
of the restoration sites.
e. Maintenance plan /guidelines. The maintenance plan shall
include: 1) weed control, 2) herbivory control, 3) trash removal,
4) irrigation system maintenance, 5) maintenance training, and
6) replacement planting.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 24
Mitigation Monitoring Program
C
fA
L d
ri
r.
G7
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
f. Monitoring Plan. The Monitoring Plan shall include:
Monitoring: Three to
Applicant, Biologist,
Ongoing observation and
1) qualitative monitoring (i.e., photographs and general
five years
Community Development
reporting
observations), 2) quantitative monitoring (i.e., randomly placed
Director
transects), 3) performance criteria as approved by the resource
Compliance with and
agencies, 4) monthly reports for the first year and bimonthly
successful implementation of
reports thereafter, and 5) annual reports which shall be
measure(s) will be determined
submitted to the resource agencies for three to five years. The
by the Community
monitoring shall be conducted for three to five years,
Development Director
depending upon the performance of the site and as approved
by the City of Moorpark. If the performance standards are not
met in the first five years, the applicant shall meet with the City
of Moorpark and develop appropriate remedial measures for
habitat loss.
g. Long -term preservation. Long -term preservation of the site
shall be outlined in the conceptual mitigation plan to ensure the
mitigation is not impacted by future development.
h. Performance standards shall be identified and apply to the
restoration of foothill needlegrass grassland. Revegetation
shall be considered successful at three to five years if the
percent cover and species diversity of the restored and /or
created habitat areas are similar to percent cover and species
diversity of adjacent existing habitats, as determined by
quantitative testing of existing, restored, and created habitat
areas.
3. Phase A would impact 4.23 acres of U.S. Army Corps of Engineers
404 Permit and 1600
Applicant, Biologist,
Receipt of applicable permits
(USACE) jurisdictional "water of the U.S." within Specific Plan
Streambed Alteration
Community Development
development area; Buildout would impact an additional 2.32 acres,
Agreement: Prior to
Director, Applicant, USACE,
totaling 4.75 acres (RBF Consulting, 2002). With respect to the
issuance of first grading
and CDFG
California Fish and Game (CDFG) jurisdictional boundaries within
permit
the development area, Phase A would impact 16.63 acres and
Buildout would impact an additional 8.40 acres, thus totaling 25.03
acres.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 25
Mitigation Monitoring Program
C�
C.1
C7
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
Compensatory mitigation for the loss of wetland or riparian function
and values is a fundamental component of the USACE and the
CDFG permitting process. The objective of the mitigation is to
ensure no net loss of habitat values from the project. Mitigation can
consist of: 1) avoidance or minimization of impacts; 2)
compensation in the form of habitat restoration; or 3) compensation
through participation in a mitigation bank. Avoidance and
minimization of impacts is preferred. Any compensation though
restoration shall be onsite and in kind. The exact requirements for
any special permit condition established for the proposed project
would be determined by the USACE and /or the CDFG following
review of the formally submitted project application.
The applicant shall develop a detailed program prior to the
issuance of the first grading permit to ensure no net loss of habitat
values from the site which contains the following components:
a) Responsibilities and qualifications of the personnel to
implement and supervise the plan. The responsibilities of the
landowner, specialists, and maintenance personnel that will
supervise and implement that plan shall be specified.
b) Site selection. The site for mitigation shall be determined in
Mitigation
Applicant, Biologist,
As set forth in 404 Permit and
coordination with the project applicant and resource agencies.
Implementation: As set
Community Development
1600 Streambed Alteration
The site shall either be located on the Specific Plan site in the
forth in 404 Permit and
Director, USACE, and
Agreement
Nature Preserve or dedicated open space area shall be
1600 Streambed
CDFG
purchased offsite. Appropriate sites must have suitable
Alteration Agreement
hydrology and soils for the establishment of riparian species.
c) Site preparation and planting implementation. The site
preparation shall include: 1) protection of existing native
species, 2) trash and weed removal, 3) native species salvage
and reuse (i.e., duff), 4) soil treatments (i.e., imprinting,
decompacting), 5) erosion control measures (i.e., rice or willow
wattles), 6) seed mix application, 7) seed mix application, and
8) container species.
d) Schedule. A schedule shall be developed which includes
planting to occur late in fall and early winter between October
and January 30.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mil Mon Program.doc 26
Mitigation Monitoring Program
C�
f�
a j
1
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
e) Maintenance plan /guidelines. The maintenance plan shall
include: 1) weed control, 2) herbivory control, 3) trash
removal, 4) irrigation system maintenance, 5) maintenance
training, and 6) replacement planting.
f1 Monitoring Plan. The Monitoring Plan shall include: 1)
Monitoring: Five years
Qualified biologist,
Ongoing observation and
qualitative monitoring (i.e., photographs and general
or as set forth in 404
Moorpark Community
reporting or as set forth in 404
observations), 2) quantitative monitoring (i.e., randomly placed
Permit and 1600
Development Director,
Permit or Streambed
transects), 3) performance criteria as approved by the resource
Streambed Alteration
Applicant, USACE, and
Alteration Agreement
agencies, 4) monthly reports for the first year and bimonthly
Agreement
CDFG
reports thereafter, and 5) annual reports which shall be
submitted to the resource agencies on an annual basis. The
site shall be monitored and maintained for five years to ensure
successful establishment of riparian habitat within the restored
and create areas; however, if there is successful coverage
prior to five years, the project applicant may request to be
released from monitoring requirements from USACE and
CDFG and as approved by the City of Moorpark.
g) Long -term Preservation. Long -term preservation of the site
shall be outlined in the conceptual mitigation plan to ensure the
mitigation is not impacted by future development. A
conservation easement and a performance bond shall be
secured prior to implementation of the site.
h) Plan Approval. The plan shall be subject to review and
Plan Approval: Prior to
Applicant, Biologist,
Receipt of approved plan
approval by the Community Development Director of the City
issuance of first grading
Community Development
of Moorpark, in coordination with CDFG.
permit
Director, Applicant, USACE,
and CDFG
In addition, earthmoving equipment shall avoid maneuvering in
Note on grading plans
Applicant, Community
areas outside the identified limits of grading in order to avoid
Development Director
disturbing open spaces that will remain undeveloped. Prior to
grading, the natural open space limits shall be marked by the
construction supervisor and project biologist. These limited
shall be identified on the grading plan. The applicant shall
submit a letter to the City of Moorpark verifying that
construction limits have been flagged in the field.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 27
Mitigation Monitoring Program
f�
C
�9
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
4. A total of 534 trees will be impacted by Phase A and an additional
Inventory: Prior to
Applicant, Arbodst,
Verification of inventory
175 trees by Buildout. The project shall be designed to avoid trees
issuance of first grading
Community Development
to the greatest extent practicable. If this impact cannot be avoided,
permit
Director
an inventory of oak trees on the proposed development site shall
be updated by an arborist approved by the City of Moorpark
Community Development Director prior to the removal of oak trees
on the Specific Plan Site. The inventory shall record the location
and size of individual oak and walnut trees that are 9.5 inches
diameter at breast height (dbh) or larger including dead or dying
trees on the proposed development site. The inventory shall also
include the dbh, height, canopy width, aesthetic rating, health
rating, number of trunks, and appraisal value of each oak tree.
Prior to grading, orange snow fencing shall be installed around the
Fence Installation: Prior
Applicant, Biologist, and
Site inspection
trees (outside the dripline) that would not be impacted by
to grading
Community Development
construction. Fencing shall be in place and inspected by the
Director
project biologist prior to the commencement of grading. This
fencing shall remain in place throughout the construction in the
vicinity of the fenced trees until the Community Development
Director determines that the fences can be removed without placing
the trees in jeopardy of damage from construction.
As stated in Moorpark Municipal Code 12.12.070(F), "The Director
Implementation: As
Applicant, Community
Review of plans, site
of Community Development, or his or her designee, shall cause an
noted in mitigation
Development Director
inspection, receipt of fees (as
appraisal of the value of said trees to be prepared in accordance
measure
applicable)
with Section 12.12.050C. The resulting value shall be applied to
upgrading the size of tree plantings associated with the project."
The replacement of coast live oak trees shall occur at a minimum
3:1 ratio based on the appraisal value of the trees as set forth in
Municipal Code 12.12.070 (f). Oak trees relocated into landscape
areas of the Specific Plan site shall not count toward meeting the
mitigation obligation of the project.
The Landscape Architect/designer for the project shall design these
Design: Prior to the
Applicant, Landscape
Review of plans
replacement trees into the Specific Plan site to replace the habitat of
issuance of the first
Architect, Biologist,
removed woodlands. The habitat shall be reviewed by a qualified
grading permit
Community Development
biologist and must be comparable to the removed woodland.
Director
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 28
Mitigation Monitoring Program
C
�l
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
Planting specification shall be considered the following:
Monitoring: Five years
Applicant, Biologist,
Ongoing observation and
Community Development
reporting
a) Newly planted trees shall be planted above grade and
Director
maintained for five years, including irrigation, weed control,
herbivore protection, and replacement.
b) Amending the backfill soil with wood shavings, oak leaf -
molded, etc. is not recommended when existing soil is high in
natural organic matter with a sandy loam texture, unless
recommended by the project biologist.
c) Recommendations for the need of planting amendments and
drainage systems shall be based on soil tests of this project
and approved by the City.
d) Any City approved work within the driplines of saved trees
including branch removal, shall be under the inspection of a
qualified biologist.
e) Landscaping requiring irrigation shall not be planted within
dripline of oaks due to the susceptibility of native oaks to root
rot caused by excessive unseasonable irrigation. The design
and installation of irrigation systems outside the dripline of the
oaks shall be such that the area within the dripline is not
wetted during operation of the system. In addition, surface
runoff from impermeable surfaces shall be directed away from
oaks; where natural topography has been altered, provisions
should be made for drainage away from trunks of oaks so that
water shall not pond or collect within the dripline of any oak.
5. A spring survey shall be conducted and completed prior to the
Survey: During the
Applicant, Botanist
Receipt of survey report
issuance of the first grading permit. The special status plant
spring prior to issuance
species surveys shall follow the guidelines developed by the
of first grading permit
California Native Plant Society (CNPS) (Tibor, 2001). These
surveys, as outlined by the guidelines, shall be conducted during
the appropriate time of year for each species determined by a
qualified botanist. If any special status plant species is located its
rarity and abundance shall be evaluated and the appropriate
mitigation shall be implemented. The following mitigation strategy
shall be used in the evaluation.
SACommunity Development \DEV PMTS \S P \11 -North Park\Environmenta1\050512 Draft Mit Mon Program.doc 29
Mitigation Monitoring Program
C
0
Cy
V
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
The special status plant mitigation strategy is based on the
Mitigation
Applicant, Botanist,
As set forth in mitigation
following guidelines:
Implementation: As set
Community Development
measure
forth in mitigation
Director, USFWS, and
• Avoiding the impact to the species to the extent possible
measure
CDFG
through project planning.
• Minimizing impacts
• Rectifying the impact by repairing, rehabilitating, or restoring
the impacted environment
• Reducing or eliminating the impact over time by preservation
and maintenance operations during the life of the project
• Compensating for the impacts by replacing or providing
substitute resources or environments
If avoidance is not possible then consultation with the U.S. Fish and
Wildlife Service shall be required for federally - listed species and
consultation with California Department of Fish and Game for state -
listed species shall be required. A special status plant mitigation
monitoring program shall be developed following focused surveys
and submitted to the appropriate agencies for review.
6. A focused series of surveys shall be conducted by a permitted
Surveys: Prior to
Applicant, Permitted
Receipt of Survey Reports
biologist for the western spadefoot toad prior to the issuance of the
issuance of first grading
Biologist, Community
first grading permit and during the breeding species for this species
permit and during the
Development Director
(February through May). The survey results shall be submitted
breeding season for this
within 45 days after completion of the last survey to the California
species (February
Department of Fish and Game for concurrence. If it is determined
through May)
that the western spadefoot is not present, no further mitigation is
necessary. If the western spadefoot is located, then a relocation
Relocation Program:
Applicant, Qualified
As stated in relocation
program shall be developed. The relocation programs shall include
Completed prior to the
Biologist, Community
program
a detailed methodology for locating, capturing, and relocating of the
issuance of the first
Development Director and
western spadefoot prior to capture. The relocation program
grading permit
California Department of
required a biologist with the necessary permits for handling the
Fish and Game
western spadefoot. The program and the biologist(s) implementing
the program shall be subject to approval of the CDFG. The
relocation program shall be completed prior to the issuance of the
first grading permit.
S1Community Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 30
Mitigation Monitoring Program
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
7. The focused surveys of the coastal California gnatcatcher found
Prior to issuance of the
Applicant, Biologist, U.S.
Determination of need for
one pair in the Buildout area of the project. As a result,
grading permit for the
Fish and Wildlife Service,
permit, further action as
consultation with the U.S Fish and Wildlife Service shall occur in
access road and
and Community
stated in permit (if applicable)
order to obtain a take permit prior to any project activities that may
interchange
Development Director
result in impacts on the coastal California gnatcatcher. The
permitting can occur through either Section 7 or 10 of the Federal
Endangered Species Act depending on the presence or absence of
a federal nexus. The permitting process would require the
preparation of a Biological Assessment, which would include a
mitigation plan to avoid or minimize impacts on this species. This
mitigation may include avoiding the habitat of the coastal California
gnatcatcher, construction limited to non - breeding season, noise
restrictions on construction, or purchase of offsite habitat for this
species, in addition to the preserved coastal sage scrub in the
Nature Preserve.
8. At least one focused survey shall be conducted for the burrowing
Prior to the issuance of
Applicant, Biologist,
Review of survey and
owl prior to the issuance of a grading permit and during the
each grading permit
California Department of
mitigation program (if
breeding season for this species (March through August). The
and during the breeding
Fish and Game, and
applicable), further action as
survey results shall be submitted 45 days after completion of the
season for this species
Community Development
stated in mitigation program
last survey to the California Department of Fish and Game (CDFG)
(March through
Director
(if applicable)
for concurrence. If it is determined that the burrowing owl is not
August).
present, no further mitigation is necessary. If the burrowing owl is
located on the development area, a mitigation program shall be
developed. If an active burrow is present, the active site shall be
protected until nesting activity has ended in compliance with
Section 3503.5 of the California Fish and Game Code. Nesting
activity for raptors in the project region normally occurs from
February 1 to June 30. To protect active burrows the following
restrictions on construction are required between February 1 and
June 30 (unless burrows are no longer active as determined by a
qualified biologist). Any active burrows found during survey efforts
shall be mapped on the construction plans
a. Clearing limits will be established a minimum of 100 feet in any
direction from any active burrow.
b. Access and surveying will not be allowed within 50 feet of any
active burrow.
Construction during the non- nesting season can occur only if a
qualified biologist has determined that the burrows are no longer
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 31
Mitigation Monitoring Program
C
C)
C�
tJ
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
active. If an active burrow is observed during the non - nesting
season, the burrow shall be monitored by a qualified biologist, and
the biologist will evacuate the burrows in a manner consistent with
any applicable state or federal laws or regulations and using
CDFG- approved burrow closure procedures. The mitigation
program shall include measures to assure nesting success if the
survey(s) determines a breeding pair is present. Prior to
implementation of the mitigation program, the program and the
biologist implementing the program shall be subject to approval of
the CDFG.
9. The project has the potential to impact nesting raptors, including
No earlier than 45 days
Applicant, Biologist,
Review of survey, further
the white - tailed kite, northern harrier, Cooper's hawk, golden eagle,
and no later than 20
Community Development
action if necessary and as set
long -eared owl, and burrowing owl, as well as other common raptor
days prior to
Director, City Engineer;
forth in mitigation measure
species, should they nest within the Specific Plan development
construction or
CDFG
area.
grading /site preparation
activities that would
No earlier than 45 day and no later than 20 days prior to
occur during the
construction or grading /site preparation activities that would occur
nesting /breeding
during the nesting /breeding season of native raptor species
season of native bird
potentially nesting on the site (typically February through August),
species potentially
the applicant shall have a survey conducted by a qualified biologist
nesting on the site
approved by the Community Development Director to determine if
(typically February
active raptor nests are present in the construction zone or within
through August)
200 feet of the construction zone. A report of this field survey shall
be submitted the Community Development Director. Construction
Raptor Survey Report:
can proceed if no raptor nests are located during this survey. If an
Within 30 days of
active nest is found during the survey, a 500 -foot (this distance may
survey
vary depending on the raptor species and construction activity, as
determined by the biologist) fence barrier (subject to the review and
Monitoring Report:
approval of the Community Development Director) shall be erected
Within 30 days of
around the nest site and clearing and construction within the fenced
completion of
area shall be postponed or halted, at the discretion of the biological
monitoring
monitor, until the nest is vacated and juveniles have fledged and
are independent of the nest, as determined by the biologist, and
there is no evidence of a second attempt at nesting. The biologist
shall serve as a construction monitor during those periods when
construction activities shall occur near active nest areas to ensure
that no inadvertent impacts on these nests shall occur. Results of
the raptor survey and any subsequent monitoring shall be provided
to the California Department of Fish and Game and any other
appropriate agency.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 32
Mitigation Monitoring Program
C>
C�
C;
C.J
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
10. Individuals using the Nature Preserve for passive recreation would
Prior to issuance of first
Applicant, Biologist,
Acceptance of management
result in the disturbance of natural open space areas adjacent to
grading permit
Community Development
plan; compliance with
the development area. An appropriate plan for the management of
Director; designated
management plan would be
the Nature Preserve shall be submitted to the City of Moorpark.
Conservation Organization
the responsibility of the
The management plan shall include access points including parking
Conservation Organization
and restrooms, signage for trails and restricted uses, appropriate
fencing, and restrictions on domestic animals. This plan shall be
written by a qualified biologist prior to issuance of the first grading
permit
3.7 Geology and Soils
Project Design Features
• The earth -fill dams that impound the existing onsite reservoirs will
During grading
Applicant, City Engineer,
Site inspection
be removed.
Community bevelopment
Director
Standard Conditions and Requirements
• The proposed development, including the recreational lake, shall be
Prior to issuance of
Applicant, City Engineer,
Review of plans
designed in compliance with the Uniform Building Code (UBC),
grading permits
Community Development
accepted industry standards, and the City's earthquake safety
Director
Municipal Code requirements in Chapter 15.32.
• Abandoned water and oil wells (if encountered) shall be abandoned
Abandonment: Prior to
Applicant, California
Site inspection
following the guidelines established by the California Department of
issuance of grading
Department of
Conservation, Division of Oil and Gas and City Municipal Code
permits
Conservation, Division of
requirements in Chapter 8.40 for water wells. The lead agency
Oil, Gas and Geothermal
associated with the potential abandonment of oil and injection wells
Resources, City Engineer
is the California Department of Conservation, Division of Oil, Gas
and Geothermal Resources ( DOGGR). Existing inactive oil wells
located within proposed development areas, if encountered during
grading, may require re- abandonment in accordance with the
current DOGGR regulations.
Potential water wells encountered during grading shall be
Water Wells: During
Applicant, City Engineer,
Observation of grading
abandoned in accordance with the guidelines of the Ventura
grading
Ventura County Public
activities
County Public Works Agency, Water Resources Department. If
Works Agency, Water
underground storage tanks are encountered during grading, they
Resources Department,
shall be abandoned in accordance with the guidelines of the
Ventura County Resource
Ventura County Resource Management Agency, Environmental
Management Agency,
Health Division. The abandonment of wells and disposal of
Environmental Health
underground storage tanks shall be observed by an environmental
Division
consultant in conjunction with the pertinent regulatory agencies.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 33
Mitigation Monitoring Program
0
C
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
Additional site assessments, soil sampling and laboratory testing,
See Section 3.11,
See Section 3.11, Public
See Section 3.11, Public
and analyses may be required if potential contaminated soils are
Public Health and
Health and Safety Mitigation
Health and Safety Mitigation
encountered during grading due to the presence of underground
Safety Mitigation
Program
Program
facilities, buried debris, stained soils, waste drums, tanks, or
Program
odorous soils.
• Prior to issuance of a grading permit for any development on the
Plan: Prior to issuance
Applicant, City Engineer
Review of plan
Specific Plan site, the project applicant shall submit an erosion
of grading permits.
control plan to the City Engineer for review and approval. The
erosion control plan shall include measures to reduce the amount
of onsite and offsite erosion during construction of the proposed
project, proper care of drainage control devices, proper irrigation,
rodent control, and landscaping. To supplement the erosion control
Implementation: Within
Applicant, City Engineer
Site inspection
plan, hydroseeding of affected graded slopes shall be performed by
30 days of grading of
the project applicant within 30 days of grading of the slope area.
the slope area.
• The design and construction of the lake shall comply with current
Prior to issuance of a
Applicant, City Engineer
Review of plans and
dam safety design standards as set forth by the State of California
grading permit
specifications
Department of Water Resources, Division of Safety of Dams
(DSOD) requirements, to reduce the hazard of seiche and potential
inundation of downstream areas in the event of dam failure. To the
extent required by law, the detention basin structures shall also
comply with the DSOD requirements for their design and
construction.
Mitigation Measures
1. Complete removal and recompaction of the alluvial deposits to
During grading activities
Applicant, City Engineer
Site inspection
geotechnically competent materials shall be performed to the
satisfaction of the City Engineer in areas proposed for development
if fill is to be placed on top of these sediments. Additional
compressible materials that will probably require removal include
topsoil, colluvium infilling swales and landslide grabens, surficial
slumps, debris flows, landslide debris, and uncontrolled fills.
2. The small landslides in the southern and central portions of the
Prior to issuance of a
Applicant, Engineering
Review of report, additional
Specific Plan site where development is proposed shall be
grading permit
Geologist, Geotechnical
monitoring as noted in report
evaluated further prior to grading for parcel /tract maps by an
Engineer, City Engineer
engineering geologist and a geotechnical engineer to determine
their lateral extent, depth, and potential instability from grading. If
these areas are to be buried under the proposed fills, partial to
complete removal of the landslides during grading as
recommended by the reviewing engineer will be necessary to
mitigate the effects of settlement due to fill loads. The grading plan
S1Community Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 34
Mitigation Monitoring Program
C
}1
L7
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
shall be subject to the approval of the City Engineer.
3. During the review of tentative tract maps and discretionary permits,
During the review of
Applicant, Engineering
Review and acceptance of
faults mapped within the development area of the Specific Plan site
tentative tract maps and
Geologist, City Engineer
geologic report; site
shall be examined in the field by a geologic engineer to verify their
discretionary permits
inspection
location and recency of movement. Exploratory work shall be
conducted to locate and define the activity status of the northeast to
northwest- trending faults that have been mapped within the area
proposed for development. If an active fault is encountered,
structural setbacks away from the active fault shall be prescribed by
a certified engineering geologist.
4. Areas of loose, cohesionless soils (i.e., unconsolidated alluvial
During grading activities
Applicant, Geologist,
Site inspection
deposits, colluvium, topsoil, and debris flow deposits) that may be
Geotechnical Engineer, City
susceptible to seismic ground shaking, fault- induced ground
Engineer
rupture, liquefaction, landslides, or settlement shall be completely
removed and replaced with compacted fill during all grading
activities for tract maps and discretionary permits. This work shall
be based on investigation by a geologist and approved by the City
Engineer. Areas underlain with artificial fill, especially where placed
as part of the oil field activities or in the reservoirs, shall also be
removed and recompacted during grading. Subdrains shall be
placed according to a soils engineer's recommendations along
canyon bottoms. A geotechnical engineer shall evaluate areas of
sandy alluvial soils within the proposed development area that will
not be removed during grading for potential liquefaction and provide
site - specific measures.
5. Prior to the issuance of grading permits for individual tracts or
Prior to the issuance of
Applicant, Geologist,
Review and acceptance of
parcels, additional detailed geotechnical investigations and slope
grading permits for
Geotechnical Engineer, City
geologic reports
stability analyses shall be performed for the slopes impacted by
individual tracts or
Engineer
seismically- induced landslides, and site - specific measures
parcels
implemented, as necessary. This shall include transitional landslide
areas in the north - central portion of the Specific Plan site.
Mitigation alternatives for unstable slopes include the construction
of earthen buttresses, re- grading of the slopes to less steep
gradients, or delineation of structural setbacks. If some of the
landslides that encroach onto the northerly portion of the proposed
development are left in place without stabilization, a review of their
stability under seismically loading shall be conducted and
remediated.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 35
Mitigation Monitoring Program
0
f
f�
C�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
6. Concurrent with the submittal of all tentative tract maps, the project
Concurrent with the
Applicant, City Engineer,
Review and acceptance of
applicant shall submit a detailed geologic and soils engineering
submittal of all tentative
Community Development
reports
report meeting the requirements of the City of Moorpark
tract maps
Director
Subdivision Ordinance. If the detailed investigation confirms the
Monitoring of additional
existence of geologic hazards, the City Engineer shall require use
conditions noted on all
limitations or special earthquake resistant design features as
grading, building, and
appropriate. Other specific recommendations included in the report
improvement plans and
shall be incorporated into the grading, building, and improvement
permits per language in
plans and permits for each discretionary permit required by the City
conditions
of Moorpark.
7. Development areas shall be stripped of vegetation and debris prior
Prior to the start of
Applicant, City Engineer
Site inspection
to the start of grading. Irrigation lines and abandoned underground
grading
storage tanks (if encountered), and water and oil wells shall be
removed and disposed off the site. Any sump deposits
encountered on the site shall be identified and remediated as
Prior to placement of
necessary. Prior to placement of compacted fill, all compressible
compacted fill, all
materials shall be removed. The grading plan shall be approved by
compressible materials
Applicant, City Engineer
Site inspection
the City Engineer.
shall be removed
8. Construction of onsite structures shall begin only after settlement of
Prior to issuance of
Applicant, Geotechnical
Review and acceptance of
fill materials in deep canyon areas has been stabilized. In order to
building permits
Engineer, City Engineer
reports
determine when settlement is complete, laboratory testing and
analysis by a geotechnical engineer shall be performed for as-
graded conditions on all tracts /parcels in areas over large canyon
fills. An alternative would be the installation of a settlement
monitoring system. Determination of where testing is required and
findings of the stability analysis shall be approved by the City
Engineer prior to construction.
9. A determination of soil expansivity and development of appropriate
Prior to issuance of
Applicant, Geotechnical
Review and acceptance of
remedial measures shall be performed by a geotechnical engineer
grading permits and
Engineer, City Engineer
reports, site inspection
prior to site development. This evaluation shall be performed
during grading
during the subsurface geotechnical investigations. If expansive
clay is encountered at shallow depths, clay -rich soils shall be
removed and replaced with a specified thickness of non - expansive
granular soil beneath the structures, concrete slabs, and footings,
as necessary. During grading of localized expansive soils mixing
with the more common, granular non - expansive soils present onsite
should be sufficient to mitigate this impact. Alternatively, mitigation
of expansive soils can be accomplished during construction by pre -
saturation of the expansive materials and /or reinforcement of the
building foundations and slabs.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Mit Mon Program.doc 36
Mitigation Monitoring Program
C'
0
C
f,
C)
'l
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
10. Prior to the issuance of the first grading permit, the applicant shall
Prior to issuance of first
Applicant, Geotechnical
Review and acceptance of
conduct a visual inspection, with photographs, of the existing
grading permit
Engineer, City Engineer
visual inspection report, site
residences located along the south - southwestern perimeter of the
inspection
Specific Plan site and shall establish surface survey monuments in
the existing fill areas adjacent to these residences prior to grading
of the Specific Plan site. This information will establish a baseline
of the existing conditions of these residences prior to grading in
order to compare home conditions at the completion of grading.
11. Debris and /or retention basins shall be designed by the project
Prior to issuance of
Applicant, Project Engineer,
Review and acceptance of
applicant's engineer to mitigate any debris flows that may emulate
grading permits, during
City Engineer, Community
plans, site inspection;
from the undeveloped portions of the site. The project engineer
grading, and annual
Development Director,
corrective actions will be
shall perform regular field checks of the debris and retention basins
check of erosion control
Ventura County Watershed
taken for any non - performing
during the entire construction period and until the slopes and
devices
Protection District
erosion control devices
graded areas have been revegetated to the satisfaction of the City
Engineer and Community Development Director. Following the first
season storm after construction of backbone infrastructure, the
project engineer shall field check erosion control devices to confirm
that they are performing as designed. All subsequent annual field
checks shall be performed by the pertinent agency (e.g., Ventura
County Flood Control, Maintenance District).
12. Prior to the issuance of each grading permit, debris flows and
Prior to the issuance of
Applicant, Project Engineer,
Review and acceptance of
surficial slumping shall be evaluated and permits conditioned so
each grading permit
City Engineer, Community
reports, site inspection;
that surficial landslide and debris flow deposits are either removed
Development Director
corrective actions will be
during mass grading or contained with an adequately -sized
taken for any non - performing
retaining device, such as a debris basin, during construction of
retaining devices
infrastructure. Additional evaluation to determine the locations and
potential debris flow volumes should be performed during the
design phase of the proposed debris basins.
13. To mitigate potential large landslides in the north - central portion
Prior to issuance of
Applicant, Geotechnical
Review and acceptance of
near the helispot, observatory, and northernmost water tanks, the
first grading permit
Engineer, City Engineer,
plans, site inspection
following mitigation measures shall be implemented:
Community Development
Director, Ventura County
a. For the natural and proposed slopes on the southeast side of
Fire Protection District,
the landslide area, slope trimming and /or construction of
Ventura County Waterworks
soldier piles is required.
District No. 1
b. For the natural slope adjacent to the northwest of the proposed
water tank site (head scarp area of the existing landslide
complex), construction of soldier piles extending below the
potential failure surfaces and /or construction of shear /buttress
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 37
Mitigation Monitoring Program
C�
C`
Fa
C�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
keys and fills in the upper portion (head scarp area) of the
existing landslide complex is required.
Or
c. Alternately, the helipad, observatory, and water tanks shall be
shifted to the south, away from the existing landslide, along the
existing ridgelines for approximately 50 to 100 feet.
14. To ensure low permeability of the lake lining, special handling (i.e.,
Applicant, Project Geologist,
Review of handling of lake -
special stockpiling and mixing procedures) of the Saugus
During excavation
City Engineer
lining material
Formation bedrock mined for the lining shall be required. Further
laboratory testing of the stockpiled materials shall also be required
to confirm the suitability of these soils prior to their placement.
Additionally, the soils derived from this bed shall be mixed with soils
having a higher percentage of particles two microns in size, as
determined by the project geologist.
3.8 Hydrology and Water Quality
Project Design Features
• As a part of the Phase A and buildout projects, the project design
Prior to issuance of a
Applicant, City Engineer
Review of plans, site
incorporates onsite debris and retention basins.
grading permit
inspection
Standard Conditions and Requirements
• During grading, the following requirements shall apply:
During grading
Applicant, City Engineer
Site inspection
a. Grading may occur during the rainy season from October 15th
to April 15th subject to approval by the City Engineer and
installation of erosion control facilities. Erosion control
measures shall be in place and functional between October
15th and April 15th. In order to comply with the October 15
date, revised erosion control plans shall be submitted to the
City Engineer, no later than September 15th of each year from
the start of grading or clearing operations to the time of grading
bond release.
b. Temporary irrigation, hydroseeding and erosion control
measures shall be implemented on all temporary grading.
Temporary grading is defined to be any grading partially
completed and any disturbance of existing natural conditions
due to construction activity. These measures will apply to
temporary grading activity that remains or is anticipated to
SACommunity Development\DEV PMTS \S P \11 -North Park \Env1ronmenta1\050512 Draft Mit Mon Program.doc 38
Mitigation Monitoring Program
f�
W
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
remain unfinished or undisturbed in its altered condition for a
period of time greater than 30 days or the beginning of the
rainy season whichever comes first.
Mitigation Measures
1. The applicant shall be responsible for the preparation of a
Prior to issuance of the
Applicant, City Engineer,
Review and acceptance of
comprehensive Master Plan of Drainage for the North Park Specific
first grading permit
Ventura County Watershed
Master Plan of Drainage
Plan site in conjunction with the Ventura County Watershed
Protection District
Protection District adopted Master Drainage Plan. The Master Plan
shall address: hydrology, detention basin design, storm water Best
Management Practices (BMPs), and stream stability associated
with the Phase A and buildout projects. The Master Plan shall be
submitted to the City of Moorpark and the County of Ventura for
approval prior to the issuance of the first grading permit.
2. The applicant shall be responsible for the preparation of a Runoff
Prior to issuance of the
Applicant, City Engineer,
Review and acceptance of
Management Plan (RMP) to be approved by the City of Moorpark
first grading permit
Ventura County Watershed
Runoff Management Plan
City Engineer prior to the issuance of the first grading permit. The
Protection District
Ventura County Watershed Protection District adopted Master
Drainage Plan and the Ventura County Watershed Protection
Design and Hydrology Manuals shall be used as the basis for the
RMP. At a minimum, the RMP shall include the following
information:
a. Time of Concentration Calculations for each storm event for
existing and buildout conditions.
b. For buildout conditions, a master plan of "back bone" storm
drain facilities routing shall be included in the rational method
calculations.
c. Impervious ratios for onsite development shall correspond to
the Calleguas Creek Master Hydrology Study.
d. Rational method runs for all storm events using the VCRAT
program.
e. Detailed calculations for flow -by and flow - through retention and
detention basins.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 39
Mitigation Monitoring Program
f�
U
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
f. Determination of State Division of Safety of Dams jurisdictional
criteria and documentation on which basins fall within State
Division of Safety of Dams jurisdiction.
g. Channel stability and sediment transport analysis for any
natural areas adjacent to development. This analysis shall
include the natural drainage downstream of all discharge
points. In areas, where the stability analysis indicates that
channel degradation is likely, channel stabilization or other City
approved measure shall be implemented.
3. During site preparation and construction, the contractor shall
During site preparation,
Applicant, City Engineer,
Site inspection
minimize disturbance of natural groundcover on the project site until
grading, and
NPDES superintendent
such activity is required for grading and construction purposes.
construction
During grading operations, the developer shall employ a full -time
superintendent for National Pollutant Discharge Elimination System
( NPDES) compliance. If determined necessary by the City
Engineer, the NPDES superintendent shall be present on the
project site Monday through Friday and on all other days when the
probability of rain is 40 percent or higher and prior to the start of
and during all grading or clearing operations until the release of
grading bonds. The NPDES superintendent shall have full authority
to hire personnel, bind the developer in contracts, rent equipment,
and purchase materials to the extent needed to effectuate Best
Management practices. The NPDES superintendent shall provide
proof to the City Engineer of attendance and satisfactory
completion of courses satisfactory to the City Engineer totaling no
less than 8 hours directed specifically to NPDES compliance and
effective use of Best Management Practices. Proof of such
attendance and completion shall be provided to the City Engineer
prior to employment of the NPDES superintendent.
4. Prior to issuance of the initial grading permit, the applicant shall
Prior to issuance of first
Applicant, Community
Review and acceptance of
have prepared a Storm Water Quality Urban Impact Mitigation Plan
grading permit
Development Director, City
plans, site inspection, other
(SQUIMP) and include Non - Structural, Source Control, and
Engineer, Certified Erosion
monitoring actions as
Structural Best Management Practices (BMPs). A Certified Erosion
and Sediment Control
specified in the SQUIMP
and Sediment Control Professional or qualified Civil Engineer shall
professional or qualified
prepare the SQUIMP. The SQUIMP shall be reviewed and
Civil Engineer
approved by the Moorpark Community Development Director and
City Engineer. The development of the SQUIMP shall conform to
the Ventura County National Pollutant Discharge Elimination
System permit, the SQUIMP standards, and the Technical
Guidance Manual for Storm Water Quality Control Measures. The
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmental \050512 Draft Mit Mon Program.doc 40
Mitigation Monitoring Program
C�
f�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
following are the minimum required mitigation from the Technical
Guidance Manual for Storm Water Quality Control Measures.
General Site Design:
G -1 Conserve Natural Areas. This measure involves locating
development on the least sensitive portion of a site and
conserving naturally vegetated areas. This measure can
minimize environmental impacts in general and storm water
runoff impacts in particular. The design of the North Park
Specific Plan currently incorporates some of these planning
measures.
G -2 Protect Slopes and Channels. If not properly protected and
stabilized, erosion of slopes and channels can be major
sources of sediment and associated pollutants, such as
nutrients. Channel stability and erosion control measures
shall be analyzed and discussed the Master Plan of
Drainage (see Mitigation Measure 1).
G -3 Control Peak Storm Water Runoff Discharge Rates. Unless
controlled, peak storm water runoff rates from developed
areas are typically higher than those from previously
undeveloped areas. Higher peak flows can change stream
morphology and increase downstream erosion that can
damage stream habitat, impact aesthetic values, and convey
larger pollutant loads to receiving waters. Therefore, the
project must mitigate the post - development discharge rates
to less than the existing storm event peak flow rates.
G -4 Minimize Impervious Area. Suggested strategies for
minimizing imperviousness through site design include:
reduce footprints of buildings and parking lots, cluster
buildings and paved areas, use minimum allowable roadway
and sidewalk sections and parking stall widths, include
landscape islands in cul -de -sacs, use pervious pavement
materials, provide grassy bioswale area that meet NPDES
requirements within the downstream portions of the lot areas
protected and maintained by Homeowner Associations, and
use grass -lined channels or surface swales to convey runoff
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 41
Mitigation Monitoring Program
C
C.)
f�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
instead of paved gutters. Such measures shall be included
in the SQUIMP portion of the Master Plan of Drainage.
G -5 Minimize Effective Imperviousness. This approach involves
routing runoff from impervious areas over grassy areas or
other pervious areas prior to discharge to the storm drainage
system or receiving water to reduce peak flows, reduce total
runoff volume and provide some degree of pollutant removal.
Three methods for minimizing effective imperviousness
include turf buffers, grassy bioswale areas that meet NPDES
requirements within the downstream portions of the lot areas
that are protected and maintained by a Homeowners
Association, and grass -lined channels. This approach shall
be addressed in the SQUIMP portion of the Drainage Master
Plan.
Site - Specific Source
The SQUIMP portion of the Drainage Master Plan shall address:
S -1 Storm Drain Message and Signage. The appropriate
locations for the signage regarding discharge prohibitions at
storm drain inlets and a standard message to be used
throughout the Specific Plan site.
S -2 Outdoor Material Storage Area Design. General design
criteria for outdoor material storage area design.
S -3 Outdoor Trash Storage and Waste Handling Area Design.
General design criteria for outdoor trash storage and waste
handling area design.
S -4 Outdoor Loading /Unloading Dock Area Design. General
design criteria for outdoor loading /unloading dock area
design.
S -5 Outdoor Repair /Maintenance Bay Design. General design
criteria for outdoor repair and maintenance bay design.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 42 Mitigation Monitoring Program
E�
r�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
S -6 Outdoor Vehicle /Equipment/Accessory Washing Area
Design. General design criteria for outdoor vehicle,
equipment, and accessory washing area design.
S -7 Fueling Area Design. General design criteria for fueling area
design.
S -8 Proof of Control Measure Maintenance. To ensure that
maintenance is provided, the County of Ventura Watershed
Protection District may require a Maintenance Agreement
and a Maintenance Plan from the owner /operator of the
storm water control measures. The SQUIMP shall identify
the party(ies) responsible for maintenance of control
measures.
Structural/Treatment BMPs
The SQUIMP shall include structural and /or treatment BMPs. The
structural BMPs shall focus on meeting potential TMDL and
pollutant standards for residential developments. The treatment
BMPs shall conform to the Technical Guidance Manual for Storm
Water Control Measures. The SQUIMP guidelines contained in the
National Pollutant Discharge Elimination System (NPDES) Permit
and Waste Discharge Requirements for Ventura County state that
Structural BMPs are required for all new developments. The
structural BMPs shall be sized to comply with one of the following
numeric sizing criteria, unless an alternative is Considered by the
permittees to provide equivalent or better treatment. Ground water
quality must be evaluated based on the amount of water and the
potential pollutants that may be introduced associated with the
buildout of the Specific Plan site.
Volume -based BMPs shall be designed to infiltrate or treat either:
a. The volume of annual runoff based on unit basin storage water
quality volume, to achieve 80 percent or more volume
treatment by the method recommended in the California Storm
Water Best Management Practices Handbook — Industrial/
Commercial (1993), the Ventura Countywide Storm Water
Quality Management Program Land Development Guidelines,
or;
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Mit Mon Program.doc 43
Mitigation Monitoring Program
C
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
b. The 85th percentile 24 -hour runoff event determined as the
maximized capture storm water volume for the area, from the
formula recommended in Urban Runoff Quality Management,
WEF Manual of Practice No. 231ASCE Manual of Practice No.
87 (1998); or;
c. The volume of runoff produced for a 0.75 inch storm event,
prior to its discharge to a storm water conveyance system, or;
d. The volume of runoff produced from a historical- record based
reference 24 -hour rainfall criterion for "treatment' that achieves
approximately reduction in pollutant loads achieved by the 85th
percentile 24 -hour runoff event. The volume of runoff
produced from the 85th percentile 24 -hour storm event, as
determined from the local historical rainfall record;
Or
Flow -based BMPs shall be designed to infiltrate or treat either:
a) 10 percent of the 50 -year design flow rate, or;
b) A flow that will result in treatment of the same portion of
runoff as treated using volumetric standards, or;
c) A rain event equal to at least 0.2 inches per hour intensity,
or
d) A rain event equal to at least two times the 85th percentile
hourly rainfall intensity for Ventura County
The Technical Guidance Manual for Storm Water Quality
Control Measures requires that treatment controls measures
be used for any new development. The following is a partial
list of treatment control measures that may be used by the
applicant:
T -1 Grass Strip Filter
T -2 Grass Swale Filter
T -3 Extended Detention Basin
1 S1Community Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 44 Mitigation Monitoring Program
f�
�1
�ry
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
T -4 Wet Detention Basin
T -5 Constructed Wetland
T -6 Detention Basin /Sand Filter
T -7 Porous Pavement Detention
T -8 Porous Landscape Detention
T -9 Infiltration Basin
T -10 Infiltration Trench
The following discussion identifies treatment control measures
that are appropriate for use on the North Park Specific Plan
site:
T -1 & -2: Grass Strip and Swales. An appropriate treatment is
either vegetative swales, enhanced vegetated swales
utilizing check dams and wide depressions, a series
of small detention facilities designed similarly to a dry
detention basin, or a combination of these treatment
methods into a treatment train (a series of Structural
BMPs). It is essential that the SQUIMP address
treatment for North Park to assure that the runoff from
the site be treated to the "maximum extent
practicable."
In order for the vegetation swales to be effective in
the removal of potential pollutants, the swales must
be treated as water quality features and must be
maintained differently than grass areas. Specifically,
pesticides, herbicides, and fertilizers, which may be
used on the grass areas, must not be used in the
vegetation swales.
T -3: Extended Detention Basins (T -3). Construction of
extended detention basins within the proposed
retention basin is likely the most efficient way of
treating storm water runoff from North Park. The
purpose of the extended detention basin is to aid in
the removal mechanism: settling or sedimentation;
adsorption to sediments, vegetation, or detritus;
filtration by plants; microbial uptake and /or
transformation; and uptake by wetland plants or
algae. The removal of the urban runoff pollutants
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmental \050512 Draft Mit Mon Program.doc 45
Mitigation Monitoring Program
C�
Cr
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
occurs during the slow draining of the basin (minimum
24 hours).
Water Quality Basins are expected to reduce the
following pollutants: total suspended solids, total
phosphorous, total nitrogen, chemical oxygen
demand (COD), total lead, total zinc, total copper, and
bacteria.
If other treatment controls are used, such as those
discussed below, the treatment volumes for the
extended detention basins can be reduced or
eliminated. Several of the following treatment control
measures could be used within the development in
parks or single lots.
T -9 & -10: Infiltration Trenches and Basins. Infiltration Trenches
and /or Basins may be used onsite to meet potential
future TMDLs for noxious aquatic plants and
nutrients. Infiltration trenches and basins treat storm
water runoff through filtration. A typical infiltration
trench is essentially an excavated trench, which is
lined with filter fabric and backfilled with stones.
Depth of the infiltration trench ranges from three to
eight feet and functions best in areas with permeable
soils, and water table and bedrock depth situated well
below the bottom of the trench. Trenches should not
be used to trap coarse sediments, because large
sediment will likely clog the trench. Grass buffers can
be installed to capture sediment before it enters the
trench to minimize clogging. Infiltration basins are
generally used for drainage areas between five to 50
acres. Infiltration basins can be either in -line or off-
line, and may treat different volumes such as the
water quality volume or the two -year or 10 -year storm.
5. Prior to the issuance of the first grading permit and as a part of the
Prior to issuance of first
Applicant, City Engineer,
Review and acceptance of
project's compliance with the National Pollutant Discharge
grading permit
Community Development
SWPPP; ongoing monitoring
Elimination System (NPDES) program, the applicant shall file a
Director, Regional Water
of grading and construction
Notice of Intent (NOI) with the Los Angeles Regional Water Quality
Quality Control Board
for compliance with SWPPP
Control Board providing notification and intent to comply with the
State of California general permit. Prior to issuance of the first
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 46
Mitigation Monitoring Program
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
grading permit, a Storm Water Pollution Prevention Plan ( SWPPP)
must be completed for onsite and associated offsite construction
activities. A copy of the SWPPP must be available and
implemented at the construction site at all times. The SWPPP
outlines the source control and /or treatment control Best
Management Practices (BMPs) that will avoid or mitigate runoff
pollutants at the construction site to the "maximum extent
practicable." A listing of these BMPs from the California Storm
Water Best Management Practice Handbook - Construction Activity
is provided below.
CA 1 Dewatering Operations. This operation requires the use of
sediment controls to prevent or reduce the discharge of pollutant to
storm water from dewatering operations.
CA 2 Paving Operations. Prevent or reduce the runoff of pollutant
from paving operations by proper storage of materials, protecting
storm drain facilities during construction, and training employees.
CA 3 Structural Construction and Painting. Keep site and area
clean and orderly, use erosion control, use proper storage facilities,
use safe products and train employees to prevent and reduce
pollutant discharge to storm water facilities from construction and
painting.
CA 10 Material Delivery and Storage. Minimize the storage of
hazardous materials on the site. If stored onsite, keep in
designated areas, install secondary containment, conduct regular
inspections, and train employees.
CA 11 Material Use. Prevent and reduce the discharge of
pesticides, herbicides, fertilizers, detergents, plaster, petroleum
products and other hazardous materials from entering the storm
water.
CA 20 Solid Waste Management. This BMP describes the
requirements to properly design and maintain trash storage areas.
The primary design feature requires the storage of trash in covered
areas.
S: \Community Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 47
Mitigation Monitoring Program
C
f�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
CA 21 Hazardous Waste Management. This BMP describes the
requirements to properly design and maintain waste areas.
CA 23 Concrete Waste Management. Prevent and reduce
pollutant discharge to storm water from concrete waste by providing
onsite and offsite washouts in designated areas and training
employees and consultants regarding their use.
CA 24 Sanitary Septic Water Management. Provide convenient,
well- maintained facilities, and arrange regular service and disposal
of sanitary waste.
CA 30 Vehicle and Equipment Cleaning. Use offsite facilities or
wash in designated areas to reduce pollutant discharge into the
storm drain facilities.
CA 31 Vehicle and Equipment Fueling. Use offsite facilities or
designated onsite enclosed coverings to reduce pollutant discharge
into the storm drain facilities.
CA 32 Vehicle and Equipment Maintenance. Use offsite facilities
or designated onsite enclosed areas with coverings to reduce
pollutant discharge into the storm drain facilities. In addition, run a
"dry site" to prevent pollution discharge into storm drains.
CA 40 Employee and Subcontractor Training. Have training
sessions for employees and subcontractors to understand the need
for implementation and usage of BMPs and the need and purpose
for keeping the site clean.
ESC 2 Preservation of Existing Vegetation. Minimize the
removal of existing trees and shrubs because they serve as erosion
control.
ESC 10 Seeding and Planting. Provide soil stability by planting
and seeding grasses, trees, shrubs, vines, and ground cover.
ESC 11 Mulching. Stabilize cleared or freshly seeded areas with
mulch.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 48
Mitigation Monitoring Program
Q
C;:
f�
W
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
ESC 20 Geotextiles and Mats. Natural or synthetics material can
be used for soil stability.
ESC Dust Control. Reduce wind erosion and dust generated by
construction activities by using dust control measures.
ESC 23 Construction Road Stabilization. All onsite vehicle
transport routes should be stabilized immediately after grading and
frequently maintained to prevent erosion and control dust.
ESC 24 Stabilized Construction Entrance. Stabilize the
construction entrance area to reduce amount of sediment tracked
off the site.
ESC 30 Earth Dikes. Construct earth dikes of compacted soil to
divert runoff or channel water to a desired location.
ESC 31 Temporary Drains and Swales. Use temporary drains
and swales to divert offsite runoff around the construction site,
stabilized areas, and direct it into sediment basins or traps.
ESC 40 Outlet Protection. Use rock or grouted rock at outlet
pipes to prevent scouring of soil caused by high velocities.
ESC 41 Check Dams. Check dams reduce velocities of
concentrated flows, thereby reducing erosion, and promoting
sedimentation behind the dams. Check dams are small and placed
across swales and drainage ditches.
ESC 50 Silt Fence. Composed of filter fabric, which have been
entrenched, attached to support poles and sometimes backed by
wire fence support. Silt fences promote sedimentation behind the
fence of sediment -laden water.
ESC 51 Straw Bale Barrier. Place straw bales end to end in a
level contour in a shallow trench and stake them in place. The
bales will detain runoff and promote sedimentation.
ESC 52 Sand Bag Barriers. By stacking sand bags on a level
contour, creates a barrier to detain sediment -laden water. The
barrier will promote sedimentation.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 49
Mitigation Monitoring Program
C
f�
V
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
ESC 53 Brush or Rock Filter. Made of 3/ -inch to three -inch
diameter rocks place on a level contour or composed of brush
wrapped in filter cloth and staked to the toe of the slope will provide
a sediment trap.
ESC 54 Storm Drain Inlet Protection. Devices that remove
sediment from sediment laden storm water before entering the
storm drain inlet or catch basin.
ESC 55 Sediment Trap. A sediment trap is a small, excavated or
bermed area where runoff for small drainage areas can pass
through allowing sediment to settle out.
6. A combination of grass swales and centrifugal separators or Best
Prior to issuance of a
Applicant, City Engineer
Review of calculations, review
Management Practices of equivalent or superior effectiveness shall
grading permit (review
and acceptance of plans, site
be employed with the detention basins in the project design that
of calculations)
inspection; corrective actions
demonstrate compliance with all applicable groundwater quality
will be taken for any non -
policies and regulations. Prior to the issuance of a grading permit,
Prior to acceptance of
performing devices
calculations shall be provided to the satisfaction of the City
improvements
Engineer to demonstrate project compliance. Devices shall be
(inspection of devices
tested after installation and corrective actions shall be taken for
and testing for
non - performing devices.
performance
3.9 Cultural and Paleontological Resources
Mitigation Measures
1. Prior to all earthmoving activities in the vicinity of archaeological
Retention of
Applicant, City Engineer,
Receipt of proof of retention
resources (note: confidential archaeological mapping is on file at
Archaeologist: Prior to
Community Development
of archaeologist
the City of Moorpark), the project applicant shall provide written
all earthmoving
Director
evidence to the City of Moorpark Community Development Director
activities in the vicinity
or designated representative that a County - certified archaeologist
of archaeological
has been retained, shall be present at the pregrading meeting, shall
resources.
establish procedures for archaeological resource surveillance, and
shall establish, in cooperation with the City or landowner,
procedures for temporarily halting or redirecting work to permit the
sampling, identification, and evaluation of any artifacts found, as
appropriate. Prior to the issuance of a grading permit,
archaeological procedures shall be incorporated as a note on the
grading plan cover sheet. If additional or unexpected
archaeological features are discovered, the archaeologist shall
Notes: Prior to issuance
Applicant, Archaeologist,
Review of notes on grading
report such findings to the City of Moorpark Community
of grading permit.
City Engineer, Community
plans
Development Director or designated representative. If the
Development Director
archaeological resources are found to be significant, the
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 50
Mitigation Monitoring Program
�1rvJ
i,
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
archaeological observer shall determine appropriate actions, in
cooperation with the City, for exploration and /or salvage. The
archaeologist shall submit a follow -up report to the City of Moorpark
Community Development Department, which shall include the
period of inspection, an analysis of any artifacts found, and the
present repository of the artifacts. Excavated finds shall be offered
to the County of Ventura and /or designee, on a first refusal basis. If
the artifacts are refused, the landowner may retain said finds if
written assurance is provided that they will be properly preserved in
the County, unless said finds are of special significance, or a
museum in the County of Ventura indicates a desire to study and /or
display them at this time, in which case items shall be donated to
the City or designee. If no such assurance is provided by the
landowner, the City shall retain the artifacts and shall be subject to
the same stipulations set forth in this mitigation measure for
disposition of artifacts. These actions, as well as final mitigation
and disposition of the resources, shall be subject to the approval of
the City of Moorpark Community Development Director or
designated representative.
In accordance with California Health and Safety Code Section
7050.5, if human remains are found, no further excavation or
disturbance of the site or any nearby area reasonably suspected to
overlie adjacent remains shall occur until the County Coroner has
determined the appropriate treatment and disposition of the human
remains. The County Coroner shall make such determination
within two working days of notification of discovery. The County
Coroner shall be notified within 24 hours of the discovery. If the
County Coroner determines that the remains are or believed to be
Native American, the County Coroner shall notify the Native
American Heritage Commission in Sacramento within 24 hours. In
accordance with California Public Resources Code Section
5097.98, the Native American Heritage Commission must
immediately notify those persons it believes to be the most likely
descended from the deceased Native American. The descendents
shall complete their inspection within 24 hours of notification. The
designated Native American representative would then determine,
in consultation with the property owner, the disposition of the
human remains.
2. Prior to tentative tract map approval for tract directly or indirectly
Prior to tentative tract
Applicant, Archaeologist,
Review and acceptance of
affecting archaeological sites CA -VEN -509, -1130, -1131, -1134, -
map approval for tract
City Engineer, Community
reports from archaeologist,
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 51
Mitigation Monitoring Program
C�
f#
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
1135, -1137, -1138, -1140, -1143, -1146, -1148, and -1149, these
directly or indirectly
Development Director
further action if necessary
archaeological sites shall be mitigated to a less than significant
affecting archaeological
level. This shall be accomplished through implementation of one of
sites CA -VEN -509, -
the following mitigation options:
1130, -1131, -1134, -
1135, -1137, -1138, -
a. Relocation of grading boundaries /fuel modification zones to
1140, -1143, -1146,
completely avoid disturbance to the site(s). Should the
-1148, and -1149
boundary relocation be infeasible, an archaeological monitor
shall be present during grading and fuel modification brush
clearance in the vicinity of archaeological resources (note:
confidential archaeological mapping is on file at the City of
Moorpark). Fencing or stakes shall be erected outside of the
sites to visually depict the areas to be avoided during
construction.
Or, if avoidance /preservation is not feasible, then:
b. Prior to grading in the vicinity of archaeological resources
(note: confidential archaeological mapping is on file at the City
of Moorpark), Phase III data recovery (salvage excavations)
shall be conducted for these archaeological sites or any other
sites within the potential impact area of development that
cannot be avoided. The Phase III work shall provide sufficient
scientific information to fully mitigate the impacts of
development on these sites and be performed in accordance
with standards of the State Office of Historic Preservation.
In accordance with California Health and Safety Code Section
7050.5, if human remains are found, no further excavation or
disturbance of the site or any nearby area reasonably
suspected to overlie adjacent remains shall occur until the
County Coroner has determined the appropriate treatment and
disposition of the human remains. The County Coroner shall
make such determination within two working days of
notification of discovery. The County Coroner shall be notified
within 24 hours of the discovery. If the County Coroner
determines that the remains are or believed to be Native
American, the County Coroner shall notify the Native American
Heritage Commission in Sacramento within 24 hours. In
accordance with California Public Resources Code Section
5097.98, the Native American Heritage Commission must
SACommunity Development \DEV PMTS \S P \11 -North Park\Environmenta1\050512 Draft Mit Mon Program.doc 52
Mitigation Monitoring Program
C�
f�
C�
U
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
immediately notify those persons it believes to be the most
likely descended from the deceased Native American. The
descendents shall complete their inspection within 24 hours of
notification. The designated Native American representative
would then determine, in consultation with the property owner,
the disposition of the human remains.
3. Prior to the issuance of a grading permit for the roadway alignment
Prior to the issuance of
Applicant, Archaeologist,
Review and acceptance of
associated with the proposed Moorpark College SR -118
first grading permit for
City Engineer, Community
Phase II investigation
interchange associated with the North Park Specific Plan project, a
roadway alignment for
Development Director
County- certified archaeologist shall be retained by the City of
Moorpark College Road
Moorpark, at the expense of the project applicant, to perform a
and SR -118
Phase II subsurface test -level investigation and surface collection
interchange
for CA -VEN -1584. The test -level report evaluating the site shall
include a discussion of the site's significance (depth, nature,
condition, and extent of the resources), and final mitigation
recommendations and cost estimates, if required to fully mitigate
significant impacts. Should the Phase II subsurface test -level
investigation and surface collection determine the potential
presence of significant subsurface resources, CA -VEN -1584 shall
be mitigated to a less than significant level through the
implementation of one of the following mitigation options:
a. Relocation of grading boundaries /fuel modification zones to
completely avoid disturbance to the site(s). Should the
boundary relocation be infeasible, an archaeological monitor
shall be present during grading and fuel modification brush
clearance in the vicinity of archaeological resources (note:
confidential archaeological mapping is on file at the City of
Moorpark). Fencing or stakes shall be erected outside of the
sites to visually depict the areas to be avoided during
construction.
Or, if avoidance /preservation is not feasible, then:
b. Prior to grading in the vicinity of archaeological resources
(note: confidential archaeological mapping is on file at the City
of Moorpark), Phase III data recovery (salvage excavations)
shall be conducted for these archaeological sites or any other
sites within the potential impact area of development that
cannot be avoided. The Phase III work shall provide sufficient
scientific information to fully mitigate the impacts of
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 53
Mitigation Monitoring Program
f�
CJ
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
development on these sites and be performed in accordance
with standards of the State Office of Historic Preservation.
Excavated finds shall be offered to the County of Ventura, or
designee, on a first refusal basis. If the artifacts are refused,
the landowner may retain said finds if written assurance is
provided that they will be properly preserved in the County of
Ventura, unless said finds are of special significance, or a
museum in the County of Ventura indicates a desire to study
and /or display them at this time, in which case items shall be
donated to the City or designee. If no such assurance is
provided by the landowner, the City shall retain the artifacts
and shall be subject to the same stipulations set forth in this
mitigation measure for disposition of artifacts. Final mitigation
shall be carried out based upon the report recommendations
and a determination as to the site's disposition by the City of
Moorpark Community Development Department based on the
recommendations of a County- certified archaeologist.
Possible determinations include, but are not limited to,
preservation, salvage, partial salvage, or no mitigation
necessary.
In accordance with California Health and Safety Code Section
7050.5, if human remains are found, no further excavation or
disturbance of the site or any nearby area reasonably
suspected to overlie adjacent remains shall occur until the
County Coroner has determined the appropriate treatment and
disposition of the human remains. The County Coroner shall
make such determination within two working days of
notification of discovery. The County Coroner shall be notified
within 24 hours of the discovery. If the County Coroner
determines that the remains are or believed to be Native
American, the County Coroner shall notify the Native American
Heritage Commission in Sacramento within 24 hours. In
accordance with California Public Resources Code Section
5097.98, the Native American Heritage Commission must
immediately notify those persons it believes to be the most
likely descended from the deceased Native American. The
descendents shall complete their inspection within 24 hours of
notification. The designated Native American representative
would then determine, in consultation with the property owner,
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 54
Mitigation Monitoring Program
C�
f�
C`
J
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
the disposition of the human remains.
4. In order to reduce indirect impacts from increased human presence
Prior to occupancy of
Applicant, Archaeologist,
Review and acceptance of
on preserved archaeological sites outside of the development area,
residential units
Community Development
program, site inspection
a program to limit human access shall be implemented prior to
anywhere on the
Director
occupancy of residential units anywhere on the Specific Plan site.
Specific Plan site
The plan shall be developed and implemented by the project
applicant and approved by a County - certified archaeologist familiar
with the resources present at the Specific Plan site. The plan shall
include one or more of the following:
a. Fencing and /or other access - restriction methods around
archaeologically sensitive areas of the Specific Plan site to
inhibit human access, or
b. Planting of non - invasive plant species with thorns or other
characteristics in areas close to known resource to discourage
human presence, or
c. Capping of known resources, in consultation with a County -
certified archaeologist.
5. Prior to the approval of grading plans for any subdivision, planned
Prior to the approval of
grading plans for any
Applicant, Paleontologist,
City Engineer, Community
Review and acceptance of
report, proof of retention of
grading issuance of the first grading permit, a soils report shall be
subdivision, planned
Development Director
paleontologist, observation
submitted to the Community Development Director for review and
residential development
during grading operations
approval identifying the types of soils that will be exposed to
permit, or conditional
grading /disturbance activities. Along with this report, a
use permit requiring
paleontological mitigation program plan outlining procedures for
grading
site inspections, paleontological data recovery, and resource
ownership, shall be prepared and submitted to the Community
Development Director for review and approval The program shall
include sufficient monitoring of the Dotential fossil - bearing areas of
the site during grading operations with procedures for resource
recovery to ensure that paleontological resources are not lost
during grading operations. Paleontological resource requirements
shall be incorporated as a note on the grading plan cover sheet.
For most grading activities, a qualified paleontologist shall be
retained by the property owner or the City of Moorpark, at the
expense of the project applicant, to monitor, and, if necessary,
salvage scientifically significant fossil remains during grading
operations. The duration of these inspections shall be determined
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 55
Mitigation Monitoring Program
G�
Cy
f�
CJ
C�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
by the paleontologist and shall depend on the sensitivity of the rock
units, the rate of excavation, and the abundance of fossils. The
duration shall be determined by:
a. Grading activities in geologic units of high paleontological
sensitivity shall require full -time monitoring by a qualified
paleontologist.
b. Geologic units of low or moderate paleontological sensitivity
shall require part-time monitoring. If significant fossils are
observed during grading, full -time monitoring shall be
implemented.
c. The paleontologists shall have the power to temporarily divert
or direct grading efforts to allow for evaluation and any
necessary salvage of exposed fossils.
d. Monitoring may be reduced if the potentially fossiliferous units
described in this assessment are not present subsurface or, if
present, are determined upon exposure and examination by
qualified paleontological personnel to have low potential to
contain fossil resources.
6. During paleontological studies, matrix samples for microvertebrates
During paleontological
Applicant, Paleontologist,
Receipt of repository
shall be collected and processed. Recovered specimens shall be
studies
Community Development
agreement, sampling and
prepared to a point of identification and permanent preservation,
Director
reporting
including washing sediments to recover small vertebrates or
invertebrates, and curated in a qualified museum repository with
permanent retrievable storage. The paleontologist shall have a
written repository agreement prior to the initiation of mitigation
activities. These remains shall be donated to an institution with a
research and /or educational interest in the materials such as the
Los Angeles County Museum of Natural History.
7. Prior to the conclusion of grading activities for any subdivision, a
Prior to the conclusion
Applicant, Paleontologist,
Receipt and acceptance of
final report summarizing findings, including an itemized inventory
of grading activities for
City Engineer, Community
report
and contextual stratigraphic data, shall accompany the fossils to the
any subdivision
Development Director
designated repository with an additional copy sent to the City of
Moorpark Community Development Director or designated
representative. Locations of recorded fossil deposits shall remain
confidential and shall be disclosed only on a "need -to- know" basis.
The report and inventory, when submitted, would signify completion
of the program to mitigate impacts to paleontological resources for
S1Community Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 56 Mitigation Monitoring Program
C�
fa
CJ
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
that subdivision.
3.10 Public Services and Utilities
Fire Protection
Project Design Features
• A minimum 200 - foot -wide fuel modification zone from the buildable
Prior to the approval of
Applicant, Community
Review of Tentative Tract
pad along the northern portion of the site contiguous to the Nature
any Tentative Tract
Development Director, and
Maps
Preserve.
Map
City Engineer
• The fire station site identified in the approved Specific Plan will be
Prior to issuance of first
Applicant, Ventura County
Acceptance of fire station site
offered for dedication to the Ventura County Fire Protection District
building permit
Fire Protection District, and
(VCFPD). If the VCFPD determines that another site within the
Moorpark Community
boundaries of the Specific Plan site or outside of the Specific Plan
Development Director, and
site is preferable, an alternative site could be offered for dedication
Public Works Director
upon the consent of the applicant. The location and development
of a fire station would be subject to and implemented in accordance
with an agreement between the VCFPD, the City of Moorpark, and
the project applicant.
• An emergency services helispot will be provided in the Specific
Prior to issuance of first
Applicant, Ventura County
Review of grading plans, site
Plan planning area. The purpose of this facility is to provide a
grading permit
Fire Protection District, City
inspection
location for firefighting helicopters to land and fill with water or fuel
Engineer, Community
during emergency operations. It will be constructed in an area
Development Director
mutually agreed upon by the City of Moorpark, the Ventura County
Fire Protection District, and the project applicant. No private or
commercial use of the facility would be permitted.
• The project applicant has offered to enter into a Development
Per Development
Applicant, City of Moorpark
Per Development Agreement
Agreement with the City of Moorpark through which the Specific
Agreement
Plan project would reimburse the City for any property tax revenues
lost through the property tax agreement with the County of Ventura
associated with and at the time of annexation of the site to the City.
These revenues would be available to the City of Moorpark for city
services related to the project.
Standard Conditions and Requirements
• The project applicant shall pay to the City of Moorpark capital
As required for
Applicant, City of Moorpark
Receipt of fees
improvement, development, and processing fees at the rate and
individual fees
amount in effect at the time the fees are required to be paid. Said
fees shall include but not be limited to Library Facilities Fees, Police
Facilities Fees, Fire Facilities Fees, entitlement processing fees,
and plan check and permit fees for buildings and public
SACommunity Development \DEV PMTS \S P \11 -North ParMEnwonmenta1\050512 Draft Mit Mon Program.doc 57
Mitigation Monitoring Program
s
�A
rr��J
�rCJ
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
improvements.
• All structures adjacent to open space shall be designed to satisfy at
Prior to issuance of
Applicant, Ventura County
Review of plans, site
least a one -hour fire- resistant rating. Such structures shall
building permits
Fire Protection District,
inspection
incorporate fire retardant features such as boxed -in eaves, reduced
Building Official, Community
overhangs, double paned windows, convection resistant roof
Development Director
design, non - combustible roofing material, and related design
features, as set forth in the City of Moorpark Building Code.
Building permits shall not be issued until review of fire retarding
architectural features has been completed by the City of Moorpark
Building Department. Design standards meeting City of Moorpark
Building Department criteria shall be included in the Fire Hazard
Reduction Program and incorporated into the Fire Hazard
Reduction Design Guidelines for the residential units.
• During all grading and site clearance activities, all earthmoving
During all grading and
Applicant, Ventura County
Observation of grading
equipment shall be equipped with spark arrestors and at least two
site clearance activities
Fire Protection District, City
activities
portable fire extinguishers per vehicle. All equipment used in the
Engineer
vegetation clearance phase shall be equipped with spark arrestors
and best available fire safety technology. The vegetation clearance
activities shall be coordinated with and approved by the Ventura
County Fire Protection District.
• Prior to the issuance of building permits, the applicant shall be
Prior to approval of
Applicant and Ventura
Review of plans, site
required to comply with all Ventura County Fire Protection District
improvement plans
County Fire Protection
inspection
design requirements regarding hydrant locations, fire ratings for
(hydrant locations);
District
building materials, fuel modification requirements, fee payments for
Prior to issuance of
pro -rata cumulative impacts and other standard fire safety
building permits
requirements.
(standard fire safety
requirements)
Mitigation Measures
1. Prior to approval of the first final map, the project applicant shall
Prior to approval of first
Applicant, Moorpark
Review of agreement
enter into an agreement with the Ventura County Fire Protection
final map
Community Development
District (VCFPD) and City of Moorpark establishing the timing and
Director, and Ventura
funding for the provision of fire protection facility(ies) and
County Fire Protection
infrastructure requirements of the Specific Plan project.
District
2. Prior to the approval of the first final map, the project applicant shall
Fire Hazard Reduction
Applicant, Landscape
Review and acceptance of
retain a certified fire management professional to prepare a Fire
Program: Prior to
Architect, Ventura County
Fire Hazard Reduction
Hazard Reduction Program; this program shall be prepared in
approval of first final
Fire Protection District,
Program, site inspection for
consultation with the Ventura County Fire Protection District
map
Community Development
lifetime of project
(VCFPD) and the project biologist with expertise in native plants,
Director, Biologist, and
and shall be approved by the City of Moorpark Community
Monitoring: For lifetime
HOA, assessment direct, or
5: \Community Development \DEV PMTS \S P \11 -North ParMEnwonmenta1\050512 Draft Mit Mon Program.doc 58
Mitigation Monitoring Program
CJ
C.7
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
Development Director. Said program will be developed by the
of project
similar entity
project applicant, but shall be maintained by an entity(ies), such as
a homeowners' association, assessment district, or similar entity,
that can assure adequate fire hazard reduction management
throughout the lifetime of the project. The program shall apply to all
lands within 200 feet of the residences (or as amended by the
certified fire professional based on fuel modification factors
acceptable to the VCFPD. The program shall include, at a
minimum, a vegetation management program focusing on the
continued management of highly combustible vegetation while
allowing for the retention for oak trees, providing defensible space,
and the control of invasive non - native species. One component of
the program shall be the permanent establishment of fuel
modification zones to the standards of the VCFPD for all structures
adjacent to open space areas with native vegetation. Residential
building pads shall be a setback a minimum 100 feet from any
protected biological resource. The fuel modification zone shall be
designed by and planted under the supervision of a landscape
architect with expertise in native plant materials and habitat
restoration. Native and non - native low -fuel vegetation materials
shall be provided as replacement vegetation. The program shall
include specific guidelines as to the frequency of maintenance
(e.g., weed abatement), allowable species for planting,
responsibility of clearing public and private zones, and irrigation
requirements or restrictions. The timing and funding for the
provision of the vegetation management program would be subject
to and implemented in accordance with an agreement with the
VCFPD.
Law Enforcement Services
• The project applicant has offered to enter into a Development
Per Development
Applicant, City of Moorpark
Per Development Agreement
Agreement with the City of Moorpark through which the Specific
Agreement
Plan project would reimburse the City for any property tax revenues
lost through the property tax agreement with the County of Ventura
associated with and at the time of annexation of the site to the City.
These revenues would be available to the City of Moorpark for city
services related to the project.
Standard Conditions and Requirements
• The applicant shall pay to the City of Moorpark capital
As required for
Applicant and City of
Receipt of fees
improvement, development, and processing fees at the rate and
individual fees.
Moorpark
6AUommunity Development \DEV PMTS \S P \11 -North Park \Env1ronmenta1\050512 Draft Mil Mon Program.doc 59 Mitigation Monitoring Program
f�
L�
U
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
amount in effect at the time the fees are required to be paid. Said
fees shall include but not be limited to Library Facilities Fees, Police
Facilities Fees, Fire Facilities Fees, entitlement processing fees,
and plan check and permit fees for buildings and public
improvements.
• Prior to issuance of building permits, the Police Department shall
Prior to issuance of
Applicant, Moorpark Police
Review and acceptance of
review development plans for the incorporation of defensible space
building permits
Department, Community
plans, site inspection
concepts to reduce demands on police services. To the degree
Development Director
feasible, public safety planning recommendations shall be
incorporated into the project plans. The applicant shall prepare of
list of project features and design components that demonstrate
responsiveness to defensible space design concepts. Review and
approval by the Police Department of all defensible space design
features incorporated into the project shall occur prior to initiation of
the building plan check process.
Mitigation Measures
1. Prior to the initiation of grading, a construction security service shall
Prior to the initiation of
Applicant, Moorpark Police
Receipt of proof of retention
be established at the construction site along with other measures,
grading
Department, Community
of construction security
as identified by the Moorpark Police Department and the
Development Director
service
Community Development Department, to be instituted during the
grading and construction phase.
Potable Water Service
Standard Conditions and Requirements
• The applicant shall comply with all pertinent County of Ventura
Prior to Final Map
Applicant, Ventura County
Review and acceptance of
Public Works Department water and sewer connection regulations
recordation of any
Waterworks District No. 1
utility plans, site inspection
implemented by the County of Ventura Public Works Department
phase.
Waterworks District No. 1.
• Prior to Final Map recordation of any phase, the City of Moorpark,
Prior to Final Map
Applicant, City Engineer,
Review and acceptance of
Calleguas Municipal Water District, and Ventura County
recordation of any
Calleguas Municipal Water
plans, site inspection
Waterworks District No. 1 shall approve final plans for water
phase.
District, and Ventura County
distribution. The applicant shall either construct the required
Waterworks District No. 1
distribution facilities or enter into an agreement with the Calleguas
Municipal Water District and /or Waterworks District No. 1 stating
when and how facilities will be funded and constructed. The
system shall be designed and constructed to meet the
requirements of the proposed land uses and applicable City of
Moorpark, Calleguas Municipal Water District, and Waterworks
District No.1 standards.
15:\Uommunity Development\DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Mit Mon Program.doc 60
Mitigation Monitoring Program
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
Recycled Water Service
Project Design Features
• A recycled water system for the Specific Plan site shall be provided
Prior to Final Map
Applicant, City Engineer,
Receipt of agreement to
for irrigation purposes to ensure recycled water is available for
recordation of any
Calleguas Municipal Water
serve, review and acceptance
irrigation of roadway landscaping, parks, public facilities, and other
phase
District, Ventura County
of recycled system plans, site
pertinent uses as a part of Phases B and C.
Waterworks District No. 1,
inspection
City of Simi Valley
Standard Conditions and Requirements
• The applicant shall comply with all pertinent County of Ventura
During construction
Applicant, Ventura County
Review and acceptance of
Public Works Department water and sewer connection regulations
Waterworks District No. 1
plans, site inspection
implemented by the County of Ventura Public Works Department
Waterworks District No. 1.
Wastewater
Standard Conditions and Requirements
• The applicant shall comply with all pertinent County of Ventura
Prior to Final Map
Applicant, Ventura County
Review and acceptance of
Public Works Department water and sewer connection regulations
Recordation of any
Waterworks District No. 1
plans, site inspection
implemented by the County of Ventura Public Works Department
phase.
Waterworks District No. 1.
• The applicant shall be responsible for the construction of all onsite
Prior to Final Map
Applicant, Ventura County
Receipt of agreement to
and offsite sanitary sewer facilities and connections required to
Recordation of any
Waterworks District No. 1
serve, review and acceptance
serve the project. The applicant shall enter into an agreement with
phase.
of sewer facility plans, site
Ventura County Waterworks District No. 1 to construct the
inspection
improvements and the system shall be dedicated to Waterworks
District No. 1 for maintenance.
Solid Waste Disposal
Project Design Features
• Where feasible, use recycled building materials (such as fences,
Prior to issuance of
Applicant, Community
Review and acceptance of
wheel block, benches, roofing, and siding materials) in commercial
building permits.
Development Director
plans, site inspection
and public facilities buildings.
• Provide educational materials to each new resident and to schools
After completion of
Applicant, Community
Review and acceptance of
demonstrating recycling and composting of landscape materials.
each phase of
Development Director
educational materials
Grass recycling, portable chipping, onsite composting, and reuse of
construction.
trimmings, drip irrigation systems, and use of efficient fertilizers and
other landscape components.
SACommunity Development \DEV PMTS \S P \11 -North ParMEnvironmenta1\050512 Draft Mit Mon Program.doc 61 Mitigation Monitoring Program
t�
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
• Construct residential units with built -in recycling and trash
Prior to issuance of
Applicant, Community
Review and acceptance of
separation areas.
building permits
Development Director
plans
Standard Conditions and Requirements
• Prior to approval of the final map, a Solid Waste Management Plan
Prior to approval of
Applicant City's Community
Review and acceptance of
shall be prepared and submitted to the City's Community Services
each final map
Services Department
Solid Waste Management
Department Analyst responsible for Solid Waste Management
Analyst responsible for Solid
Plan
Programs for review and approval. This plan, which shall include
Waste Management
specific measures to reduce the amount of refuse generated by
Programs
construction of the proposed project, shall be developed in
consultation with the City of Moorpark Community Services
Department to meet waste reduction requirements established by
the California Integrated Waste Management Act of 1989.
Energy
Standard Conditions and Requirements
See Air Quality Mitigation Measure No. 4
Schools
Project Design Features
• An 18 -acre school site shall be conveyed to the Moorpark Unified
Prior to issuance of first
Applicant, Moorpark Unified
Acceptance of school site by
School District as a part of Phase A of the Specific Plan project.
building permit or as
School District, Community
Moorpark Unified School
specified in the
Development Director
District
provisions of a
Mitigation Agreement
between the applicant
and the Moorpark
Unified School District.
Standard Conditions and Requirements
• The project applicant shall pay school fees to the Moorpark Unified
Prior to the issuance of
Applicant, Moorpark Unified
Receipt of fees
School District pursuant to the requirements established in
each building permit or
School District
California Government Code Section 65995. The amount of fees to
as specified in the
be paid will be determined based on the established State formula
provisions of a
for determining construction costs. Applicable fees shall be paid
Mitigation Agreement
prior to the issuance of each building permit. The mitigation
between the applicant
provided by the applicant may exceed the requirements established
and the Moorpark
in California Government Code Section 65995 through the
Unified School District.
provisions of a mitigation agreement between the applicant and the
Moorpark Unified School District.
S:u;ommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 62
Mitigation Monitoring Program
i�
C.J
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
3.11 Public Health and Safety
Hazardous Materials and Waste
Standard Conditions and Requirements
• Prior to the issuance of the first grading permit, the developer shall
Prior to the issuance of
Applicant, City Engineer,
Review and acceptance of
indicate in writing to the City of Moorpark, the disposition of any oil
the first grading permit
County Water Resources
report, site inspection
or groundwater wells that may exist within the project site
Development Department,
boundaries. If any wells are designated for abandonment, or if
California Division of Oil,
future construction of any structure over or proximate to previously
Gas, and Geothermal
abandoned wells could result in a hazard to health or the
Resources
environment (Cal. Pub. Res. Code Sec, 3208.1), such wells must
be abandoned or re- abandoned pursuant to requirements set forth
in Ventura County Ordinance Nos. 2372 or 3991, and applicable
regulations of the California Division of Oil, Gas, and Geothermal
Resources (DOGGR).
• Prior to the issuance of the first grading permit, the applicant shall
Prior to initiation of
Applicant, City Engineer,
Review and acceptance of
have prepared and submitted for review and approval by the City of
Phase II investigation
County Water Resources
work plan for Phase II
Moorpark the necessary investigation, including a 'Phase ll"
(review and acceptance
Development Department,
investigation including review
investigation, to determine if the prior operation of all active and
of Phase II work plan
California Division of Oil,
and acceptance of soil and
abandoned on -site oil wells and pipelines caused any
including soil and soil
Gas, and Geothermal
soil gas sampling program,
contamination of the subsurface soil or groundwater. A work plan
gas sampling program)
Resources
review and acceptance of
for this investigation must be approved by the City prior to its
Phase II investigation final
initiation. The Phase II investigation shall include a soil sampling
report, site inspection
and soil gas sampling program to identify any potential
contamination, including contamination due to any unmapped
Prior to the issuance of
pipelines, sumps, or disposal areas. If such contamination is
the first grading permit
discovered, the applicant shall comply with all applicable laws,
(review and acceptance
rules, and regulations concerning the reporting, analysis and, if
of Phase II investigation
necessary, remediation of any such contamination, which laws and
final report and site
regulatory requirements are based on the extent and nature of any
inspection)
contamination discovered. The applicant shall comply with the
above laws and regulations concerning the abandonment of the oil
wells and any necessary remediation of any surface and
subsurface contamination with respect to property that it owns in
the Specific Plan area (including the Specific Plan area and the
area for the access road and freeway interchange that is outside
the Specific Plan area) and, if feasible and necessary to satisfy the
conditions of project approval, with respect to any property in the
development area that the developer does not own.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 63
Mitigation Monitoring Program
f�
C.�
rim
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
• If any hazardous waste is encountered during the construction of
During grading and
Applicant, City Engineer,
Observation of grading and
this project, all work in the immediate vicinity of the hazardous
construction activities
Ventura County
construction activities
waste shall be immediately stopped and the Ventura County
Environmental Health
Environmental Health Department, the Fire Department, the
Department, Ventura
Sheriffs Department, and the City Construction Observer shall be
County Fire Protection
notified immediately. Work shall not proceed until clearance has
District, Ventura County
been issued by all of these agencies.
Sheriffs Department
• A site health and safety plan, which meets California Occupational
Prior to commencing
Applicant, City Engineer,
Review and acceptance of
Safety and Health Administration (Cal /OSHA) requirements, shall
work on any
Ventura County
health and safety plan, site
be prepared and in place prior to commencing work on any
contaminated sites
Environmental Health
inspection
contaminated sites. The applicant, through its contractor, shall
Department
ensure proper implementation of the health and safety plan.
• Demolition activities involving asbestos materials are subject to the
Prior to and during
Applicant, Building Official,
Site inspection
National Emissions Standards for Hazardous Air Pollutants
demolition activities.
Ventura County Air Pollution
(NESHAP) regulations as listed in the Code of Federal Regulations
Control District
(40 CFR Park 61, Subpart M). These regulations require an
inspection or survey of the site that is to be demolished to
determine whether asbestos materials are present. Demolition
activities are also subject to Ventura County Air Pollution Control
District (VCAPCD) Rule 62.7, Asbestos, Demolition and
Renovation. Compliance with VCAPCD Rule 62.7 is adequate to
ensure that all asbestos entrainment will not cause a significant
adverse impact (source: Ventura County Air Quality Assessment
Guidelines, November 2000).
Mitigation Measures
1. Any significant soil staining associated with oil operations on the
Prior to the issuance of
Applicant, City Engineer,
Site inspection, further action
project site shall be mitigated prior to the issuance of the first grading
the first grading permit
California Division of Oil,
as determined necessary
permit as follows: Soils that contain total petroleum hydrocarbons
Gas, and Geothermal
(TPH) in concentrations below the action level may be left in place,
Resources, County of
provided that the soils do not contain other hazardous materials. The
Ventura Environmental
Ventura County Environmental Health Department shall be contacted
Health Department
by the City of Moorpark regarding regulations on clean -up levels for
naturally - occurring crude oil. All areas where oil wells, pipelines, or
other activities where crude oil may have spilled with the project
site, including the area for the access road and freeway
interchange shall be evaluated and all contaminated soil shall be
treated or disposed of in accordance with all applicable regulatory
guidelines under the VCEHD Voluntary Cleanup Program and any
other applicable regulations.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 64
Mitigation Monitoring Program
C
t�
f�
C.1
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
2. All sumps and spill containment areas located within the Specific
Prior to issuance of
Applicant, City Engineer
Site inspection
Plan development area shall be identified and sampled to
grading permits
determine the types and concentrations of the contaminants
present, if any. If contaminants are encountered, the vertical and
lateral extent of contamination shall be assessed before a
remediation alternative can be selected. Soils stained only with
crude oil and containing TPH in concentrations below the action
level established by the local lead regulatory agency may be left in
place or used as fill materials. Offsite disposal may be required for
soils contaminated with heavy metals, solvents, or other
substances.
3. The presence of an active oil field, including oil wells, sumps, and
Prior to issuance of
Applicant, City Engineer
Review and acceptance of
associated tanks, suggest that methane may be present in soil
building permits
methane gas assessment
vapor beneath the site. Because grading can affect methane
report; further action as
concentrations, a comprehensive methane gas assessment shall
determined necessary
be completed post - grading in these areas to determine if, and the
extent to which, methane mitigation measures (vapor barriers,
active or passive venting, etc.) would be required prior to or during
construction. Measures shall be implemented, if required, based
on methane concentrations, if detected, based on regulatory
requirements.
4. Natural oil seep areas shall be avoided, if feasible, during grading
Prior to issuance of
Applicant, City Engineer
Review and acceptance of
operations to minimize the spread of the related petroleum
grading permits; during
plans, site inspection
hydrocarbons into the surrounding soil.
grading
5. To determine the nature and extent of potential lead contamination
Prior to grading permit
Applicant, City Engineer
Sampling, testing, and
in the soils around the area of the shooting range, limited baseline
issuance in the area of
reporting
sampling of the shallow soils and analysis for lead prior to the start
the shooting range.
of grading operations shall be performed. If contamination is
present, the soil shall be removed and transported to an
appropriate waste disposal facility, in accordance with current
regulatory guidelines.
6. In the event unidentified, obvious, or suspected hazardous
During grading and
Applicant, City Engineer,
Observation of grading and
materials, contamination, underground tanks, or other features or
construction
County of Ventura
construction activities
materials that could present a threat to human health or the
Environmental Health
environment are discovered during grading or construction, such
Department
activities shall cease immediately until evaluated by a qualified
professional. Work shall not continue until appropriate actions
recommended by the professional have been implemented to
demonstrate that contaminant concentrations do not exceed risk -
based criteria.
SACommunity Development\DEV PMTS \S P \11 -North Park \Environmenta1\050512 Draft Mit Mon Program.doc 65
Mitigation Monitoring Program
R-1
North Park Specific Plan No. 2001 -01
Revised Draft Mitigation Monitoring Program
TABLE 1 (continued)
NORTH PARK SPECIFIC PLAN NO. 2001-01 MITIGATION MONITORING PROGRAM
EIR Section /Mitigation Program
Timing of Mitigation
Responsible Party(ies)
Monitoring Action
7. Work crews shall use respirators during project clearing, grading,
During grading
Applicant
Observation of grading
and excavation operations, in accordance with California Division of
activities
Occupational Safety and Health regulations.
8. The cabs of grading and construction equipment shall be air-
During grading
Applicant
Observation of grading
conditioned.
activities
9. Construction roads shall be paved, when possible, to reduce
During grading
Applicant
Observation of grading
fugitive dust and potential exposure to the fungus attributable to
activities
San Joaquin Valley Fever; or the access road into the project site
shall be paved or treated with environmentally -safe dust control
agents.
10. Where acceptable to the Ventura County Fire Protection District,
During grading and
Applicant, City Engineer,
Site inspection
weed growth shall be controlled by mowing instead of discing,
construction.
Ventura County Fire
thereby leaving the ground undisturbed; a mulch covering shall also
Protection District
be used when possible.
SACommunity Development \DEV PMTS \S P \11 -North Park \Environmental \050512 Draft Mit Mon Program.doc 66
Mitigation Monitoring Program
20
1s
Dribs ❑ Axie�ss
Mooipafk
College
Exhibit 4
LAND USE MAP
4&
North ?park
sr
1
NORTH
t
0 1250 2500
Scale in feet
Campus
(/ Park Drive
�-
P
(ri
MOO/park
Interchange
Noses:
1. This map illustrates phasing of developrt�k and
infrastructure necessary to support development
within each phase. The map does not depict the
phasing of the conveyance of the Nature Preserve,
the phasing of which is descried in the tart.
2. While the phasing plans depict the mein
Of the interchange as part of Phase B, the e
Specific Plan prohibits the issuance of any
axupancy permits in Phase B until the interchange
is completed.
LEGEND
21 PLANNING AREA DESIGNATION (PA NUMBER)
Land Use
SINGLE FAMILY RESIDENTIAL
■ 10A UNITS PER
10.6 UNITS PER ACRE
LAKE
70 x 120 (LOT SIZE)
❑ NATURE PRESERVE
PUBLIMUASI PUBLIC
so x 120
F--] OPEN SPACE
SCHOOL
❑ 90 x 120
El PARKS
NEIGHBORHOOD CENTEF
❑ 10O x 130
a INSTITUTIONAL
CC
ATTACHMENT 2
000X0'1
rravt_ S.G•
CITY OF MOORPARK, CALIFORNIA
City Council Meeting
of "��'0?00✓�
ACTION,
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable City Council
FROM: Barry K. Hogan, Community Development Directo
Prepared By: Jared Rosengren, Contract Pla e
DATE: April 28, 2005 (CC Meeting of 5/18/2005)
SUBJECT: Consider Industrial Planned Development (IPD) Permit
No. 2005 -01 and Administrative Exception No. 2005 -01
for the Construction of a Single - Story, 9,997 Square -
Foot Industrial Building with a Reduced Front Setback
for the Parking Lot, Located on a 0.58 -acre Lot North
of the Terminus of Fitch Avenue, on the Application of
Gehricke Architects for Creative Woodworks
BACKGROUND
Gehricke Architects has submitted a request for
of a single- story, 9,997 sq. ft. industrial bui
acre lot located north of the terminus of Fitch
map attached). The application includes a
Administrative Exception for a reduction of a
front yard setback.
the construction
lding on a 0.58 -
Avenue (location
request for an
required minimum
This project was reviewed by the Planning Commission on April
26, 2005, and public comments were received. The Planning
Commission adopted Resolution No. PC- 2005 -476 recommending to
the City Council approval of the Industrial Planned Development
Permit for the proposed project. The Planning Commission agenda
report and resolution are attached.
DISCUSSION
A portion of the proposed parking lot encroaches into the
required twenty -foot (201) foot front yard setback. The
applicant has requested an Administrative Exception to allow a
20% reduction in the front yard setback. The reason for the
request arises from the irregular shape of the front property
0001--l",
Honorable City Council
May 18, 2005
Page 2
line caused by the cul -de -sac at the terminus of Fitch Avenue.
Section 17.44.040 of the Zoning Ordinance states an
Administrative Exception may be granted for a 20% decrease of
any required setback by the Community Development Director,
provided it be granted only once. Findings for an
Administrative Exception require that it not impact neighboring
properties, that strict application of the Zoning Regulations
creates practical difficulties or unnecessary hardships, and the
granting of the exception is consistent with the General Plan
and applicable Specific Plans. Because the project requires
City Council approval of an IPD Permit, the Community
Development Director has determined that that Administrative
Exception should be considered concurrently with the IPD Permit
application by Council, as allowed by Section 17.44.040 of the
Moorpark Municipal Code.
STAFF RECOI- SMNDATION
1. Open the public hearing, accept public testimony, and close
the public hearing;
2. Adopt Resolution No. 2005- approving Industrial Planned
Development 2005 -01 subject to Conditions of Approval and
directing the Community Development Director to approve
Administrative Exception No. 2005 -01.
ATTACHMENTS:
1. Location Map
2. Aerial Photograph
3. Site Plan and Elevations
4. Planning Commission April 26, 2005 Agenda Report (without
attachments)
5. Planning Commission Resolution No. PC- 2005 -476 (without
attachments)
6. Draft City Council Resolution approving Industrial Planned
Development Permit No. 2005 -01
0 CY 01 y 9 9
SPRING RD
PRINCET_Q J E - - - -
ISPRI
I
I
N/ - - -- ------ ---- - -- -- -- N/A - - - -- --- -- -- -. - --
I
I
I
iSPRII G RD
' -`- - --
I/ FITCH ST
IMI 4OR ST (ZACHARY ST
� 1
Iw E
I I 1
LOCATION MAP
NORTH
iJ CC ATTACHMENT 1
c
v
.�inww
w
e
•
g�g �
i
.f:
C '
tip �i I
g �
t
III
6 "JIN 7n
T./wwiti,µ.l .i
M'w>•bv,TjnM� q
A
pwt rI'I
swM Draw ,mw„ F�YMV
n�ws+.y y
5
..w'J'1+.�µ'M+t•hl difr
iICYS:4 -i{;Q RI U114.ti i(.K
^:'4Mw7 Yn1aµ AS "M�7 N,'pi
H pT'4 d
.. /X• e.ryM /Iamb navJ
AC [vbb yY91
�,N `rv;rzt ++yew.p
.'1'A
iµ .ary
tad' ^RMir_w4t s.; vl
Mw
.c M�'mjA i�hA�
M '
VJ- d(.Jl ?I`G?Jd
IN'n 0K1O-XoJNj
OMOYI{" olilnwd NUBMIR09 .1
e�
�t
z
C
lry
I
iii,
H
z
U
H
N
a
U
U
t, . i-irst noo i Rcjs Plax, _
r+ _ Cxu-ep!ua! Lighting Ptar.
_ n .� C�� Wt�oduee:� tree i,ul
e
West Cl4vild0al Waves Air gap)
used n, rr�ww
A El-I I ?,
North Elevation (PoOrwA SWep
-- --4
Fast Flevativii (Faces Culp, vurtj�
•
u
CREATIVE WOODWORKS
FITCH AVENUE
PLANT LEGEND
MOTAN CAL
NE[5
Al C1. mm' W56AIC
I. .LA
� 'MIA, 1." 71
gr
W
0 1.
W4 D ..14.fM —I %LL U— MUUN XaWY1pM -T ad
C.)
J
A06 PAO -*WWNUu C, 1,051JAIL's, N4u-1
sm I=— 1--$ $FWK JAX"T
KAIWI
TOTAL PARKING LOT SQUARE FOOTAGE - 8,On SO FT
CANOPY COVERAGE At 10 YEARS 4^, 5 0 1,
2/ 1 8/u!i
LANDSCAPE
CONCEPT
S A 1. E 1 20'
MOORPARK PLANNING COMMISSION
AGENDA REPORT
TO: Honorable Planning Commission
FROM: Barry K. Hogan, Community Development Direct
o
Prepared by Jared Rosengren, Contract Planne
DATE: April 20, 2005 (PC Meeting of 04/26/05)
SUBJECT: Consider Industrial Planned Development Permit No. 2005-
01 and Administrative Exception No. 2005 -01 for the
Construction of a Single- Story, 9,997 Square -Foot
Industrial Building on a 0.58 -acre Lot North of the
Terminus of Fitch Avenue, on the Application of Gehricke
Architects for Creative Woodworks
BACKGROUND
The applicant has filed a request for an Industrial Planned
Development (IPD) Permit to allow construction of an approximately
9,997 square foot cabinetry fabrication and showroom with some
office space on a 25,265 square foot (0.58 acre) parcel located at
the north side of the terminus of Fitch Avenue, east of Minor
Street. An Administrative Exception for a reduction of a required
minimum front yard setback is also requested. An Administrative
Exception by itself is acted on by the Community Development
Director without a hearing. However, when filed in conjunction with
a permit application that requires a higher level of discretion,
the Director may require it to be considered concurrently with that
permit. In this case, the Administrative Exception is being
considered concurrently with the IPD Permit.
DISCUSSION
Project Setting
Existinq Site Conditions:
The 0.58 acre, relatively flat site was created as part of an
industrial park, and is rectangular in shape except for the
southern property line, which concaves inward as a result of the
cul -de -sac on Fitch Avenue. The site is located 600 feet east of
Spring Street, 300 feet south of Los Angeles Avenue and just -,outh
CC ATTACHMENT 4 0"Ir
i�r_ ;r au e an;_ i rig Commission
April.. 26, 2005
Paae 2
of the Ventura County Transportation Commission railroad tracks.
Ti- is presently vacant, primarily covered by non - native weeds.
Previous AioQ14 cations:
On February 15, 2002, the Moorpark Redevelopment Agency acquired a
4.21 -acre parcel at the terminus of Fitch Avenue for the
construction of a Public Works /Parks, Recreation, and Community
Services Department corporate yard. By early 2004, planning and
design for the corporate yard facility had progressed to the point
that the Redevelopment Agency declared the 0.58 acres that comprise
this site as `surplus." The Redevelopment Agency solicited
development proposals for the property, and on June 2, 2004,
directed the Agency staff to negotiate a Disposition and
Development Agreement with Creative Woodworks for the surplus
property. The sale of this property required a parcel map to
separate it from the corporate yard property. Tentative Parcel Map
No. 5576 was approved by the Planning Commission on February 22,
2005. The Final Map is currently being processed by the City's
Engineering Division.
GENERAL PLAN /ZONING
Direction
General Plan
Zoning
Land Use
Site
Light Industrial
Industrial
Vacant
_........._............__. ..._._...__........_......._...
(I -1)
........... - .... -- - -_...- - _.._. _...._........_.._......
Park (M -1)
Construction
Downtown
Industrial
Materials,
North
Specific Plan -
Contractor's
Light Industrial
park (M -1)
Office, VCTC
Railroad ROW
South
Light Industrial
Industrial
Caltrans
............ _...._....__
(I -1)
Park (M -1)
Maintenance Yard
.......... _ .................---- ...._..
East
- ........... _.._ ....... _.............._--- ........... _.....-- ..._........._._.
Light Industrial
Industrial
Future Corporate
_ ............._.. ....__........__....._I...
(I-1)
Park (M-1)
Yard Facility
-_. --
West
- .._ ... ..... ...... .
L i gh t I n du s t r i a l
I n d u s t r i a l
�___.__......._._.__......._ ....._.___....... __... _.. ___. _ . _._.
Automotive Repair
(I -1)
Park (M -1)
General Plan and Zonina Consistencv:
The project is consistent with the goals and policies of the
General Plan. The Administrative Exception from the Zoning
Regulations is requested for a reduced front setback in one corner
of the site to account for the irregular front property line
resulting from the cul -de -sac bulb on Fitch Avenue. This issue is
discussed in detail later in this report.
:.ter_ table Planning Commission
April 26, 2005
Page 3
Project Suaamary
Industrial Planned Development Permit No. 2005 -01:
Proposed Use
Building Area
(Sq. Ft.)
Cabinet Fabrication Area
7,953
Office /Showroom Area
2,044
Total
9,997
Proposed Project
Architecture:
The architectural design is typical of that found on this type of
facility. The proposed buildings will be constructed of sand
blasted, natural color, tilt -up concrete panels accented with
vertical relief in combination with smooth, gray - painted exterior
panels. The building will contain architectural features such as
window glazing, decorative window scoring, reveals and accent
lighting. The showroom will have the additional treatment of false
balconies, ribbed metal roofing, and wood eve kickers.
The functional roof height for all buildings, including
architectural elements and parapet walls is consistent with the
thirty (30') foot height limit requirements of the City's Zoning
Ordinance.
Sethack .q -
A portion of the proposed parking lot encroaches into the required
twenty (20') foot front yard setback, and for that reason, the
applicant has requested an Administrative Exception to allow a
twenty (200) percent reduction in the front yard setback. This item
is discussed in further detail in the Analysis section of this
report. No side and rear setbacks are required in this zone.
Circulation:
The site is accessed via Fitch Avenue. The site has been designed
with appropriate on -site circulation. The driveway width and radii
have been designed to accommodate large trucks and heavy equipment.
Parking:
Proposed Use
Spaces Required
Spaces Provided
Manufacturing,
20
20
Wholesale, and General
Industrial Purposes
Total
20
20
V`vCh.v
.. r_i e �anrA ng Cot:,mJssi.cn
Ap r-i l 2 �, 2005
Page 4
Loading Area:
The applicant proposes two loading spaces to be located in the east
portion of the site. The loading spaces do not encroach into any
required setback and will not interfere with vehicle or pedestrian
circulation.
Landscaping:
A conceptual landscape plan consisting of a combination of trees,
shrubs and groundcover has been prepared for the site. The
applicant proposes fourteen (14 %) percent of the project site to be
landscaped, exceeding the Zoning Code minimum requirement of ten
(100) percent.
Site Improvements and National Pollution Discharge_ Elimination
Standards Requirements (NPDES):
The City Engineer has conditioned the project to provide for all
necessary on -site and off -site storm drain improvements including
the imposition of National Pollution Discharge Elimination System
(NPDES) requirements. "'Passive" Best Management Practices Drainage
Facilities are required to be provided so that surface flows are
intercepted and treated on the surface over biofilters (grassy
swales), infiltration areas and other similar solutions.
Air Quality:
As is required with all commercial /industrial projects, staff has
incorporated a standard condition requiring a contribution to the
Moorpark Traffic Systems Management Fund to off -set air pollutants,
consistent with the 2003 Ventura County Air Quality Assessment
Guidelines.
ANALYSIS
Issues
Staff analysis of the proposed project has identified the following
area for Planning Commission consideration in their recommendation
to the City Council:
• gPtYharkq
As stated above, a portion of the proposed parking lot encroaches
into the required twenty -foot (20') foot front yard setback. The
applicant has requested an Administrative Exception to allow a 200
reduction in the front yard setback. The reason for the request
arises from the irregular shape of the front property line caused
by the cul -de -sac at the terminus of Fitch Avenue. Section
17.44.040 of the Zoning Ordinance states an Administrative
Exception may be granted for a 20o decrease of any required setback
by the Community Development Director provided it be granted only
--
() 'ice, 04,
`:onora P! annynq CoT,,umissio
April 26, 2005
a g
51
once. Findings for an Administrative Exception require that it not
impact neighboring properties, that strict application of the
Zoning Regulations creates practical difficulties cr unnecessary
hardships, and the granting of the exception is consistent with the
General Plan and applicable Specific Plans. Staff had determined
that this Administrative Exception request meets those
requirements.
Findings
Tndustrial Planned Development Permit No. 2005 -01
A. The site design, including structure location, size, height,
setbacks, massing, scale, architectural style and colors and
landscaping is consistent with the provisions of the General
Plan, any applicable Specific Plans, zoning ordinance and any
other applicable regulations with the approval of an
Administrative Exception for the reduction of the front yard
setback in that the proposed industrial use is a planned and
permitted use for the site.
B. The site design would not create negative impacts on or impair
the utility of properties, structures or uses in the
surrounding area, in that the proposed industrial building
provides sufficient parking and loading spaces on site and is
situated in an area planned for industrial uses.
C. The proposed uses are compatible with existing and permitted
uses in the surrounding area, in that the proposed industrial
building is consistent with other similar projects approved
within the city.
Administrative Exception No. 2005 -01
A. The granting of the exception will not create negative impacts
to abutting properties in that the setback reduction would not
affect access, visibility, or use of abutting properties.
B. The strict application of the zoning regulations as they apply
to the subject property will result in practical difficulties
or unnecessary hardships inconsistent with the general purpose
of such regulations in that the proposed design provides for a
viable industrial building with adequate parking and loading
spaces which would be difficult to achieve without the minor
encroachment into the front setback where the cul -de -sac bulb
curves inward at the front property line.
C. The granting of the exception is consistent with the General
Plan in that industrial uses have been envisioned for this
site, and the proposed use and structure meet all applicable
goals and policies of the General Plan.
0J
ion: table Planning Com i3sio
April 26, 2005
Page 6
PROCESSING TIME LIMITS
Time limits have been established for the processing of development
projects under the Permit Streamlining Act (Government Code Title
7, Division 1, Chapter 4.5), the Subdivision Map Act (Government
Code Title 7, Division 2), and the California Environmental Quality
Act Statutes and Guidelines (Public Resources Code Division 13, and
California Code of Regulations, Title 14, Chapter 3). Under the
applicable provisions of these regulations, the following timelines
have been established for action on this project:
Date Application Determined Complete: April 20, 2005
Planning Commission Action Deadline: Not Applicable
City Council Action Deadline: June 19, 2005
ENVIRONMENTAL DETERMINATION
In accordance with the City's environmental review procedures
adopted by resolution, the Community Development Director
determines the level of review necessary for a project to comply
with the California Environmental Quality Act (CEQA). Some projects
may be exempt from review based upon a specific category listed in
CEQA. Other projects may be exempt under a general rule that
environmental review is not necessary where it can be determined
that there would be no possibility of significant effect upon the
environment. A project which does not qualify for an exemption
requires the preparation of an Initial Study to assess the level of
potential environmental impacts.
Based upon the results of an Initial Study, the Director may
determine that a project will not have a significant effect upon
the environment. In such a case, a Notice of Intent to Adopt a
Negative Declaration or a Mitigated Negative Declaration is
prepared. For many projects, a Negative Declaration or Mitigated
Negative Declaration will prove to be sufficient environmental
documentation. If the Director determines that a project has the
potential for significant adverse impacts and adequate mitigation
cannot be readily identified, an Environmental Impact Report (EIR)
is prepared.
The Director has reviewed this project and found it to be
Categorically Exempt in accordance with Section 15303 (Class 3 -
New Construction or Conversion of Small Structures) of the
California Code of Regulations (CEQA Guidelines). No further
environmental documentation is required.
U.vwt�.�
n'�rutile Planning Co=d'ssion
iy i L L , / J IJ ,1
Page
STAFF RECOMMENDATION
1. Open. the public hearing, accept public testimony and close the
public hearing.
Adopt Resolution No. PC -2005- recommending that the City
Council approve industrial Planned Development Permit No.
2005 -01 and direct the Community Development Director to
approve Administrative Exception No. 2005 -01 subject to
conditions of approval.
ATTACHMENTS:
1. Location Map
2. Aerial Photograph
3. Project Exhibits
A. Site Plan
B. Floor Plan
C. Elevations
D. Landscape Plan
4. Draft PC Resolution with Conditions of Approval
0 ;� ( w1�
RESOLUTION NO. 2005-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, APPROVING INDUSTRIAL
PLANNED DEVELOPMENT PERMIT NO. 2005 -01 FOR A
9,997 SQUARE -FOOT CABINETRY FABRICATION SHOP AND
SHOWROOM LOCATED ON THE NORTH SIDE OF THE
TERMINUS OF FITCH AVENUE, AND DIRECTING THE
COMMUNITY DEVELOPMENT DIRECTOR TO APPROVE
ADMINISTRATIVE EXCEPTION NO. 2005 -01 FOR A
REDUCED FRONT SETBACK FOR PARKING, ON THE
APPLICATION OF GEHRICKE ARCHITECTS
WHEREAS, on April 26, 2004, the Planning Commission adopted
Resolution No. PC- 2005 -476, recommending conditional approval of
Industrial Planned Development Permit No. 2005 -01 for the
construction of a 9,997 square -foot cabinetry fabrication shop
and showroom on a 25,265 square -foot (0.58 acre) parcel located
at the north side of the terminus of Fitch Avenue, and that the
Community Development Director be directed to approve
Administrative Exception No. 2005 -01 for a reduced front setback
for parking; and
WHEREAS, at duly noticed public hearing held on May 18,
2005, the City Council considered the agenda report and any
supplements thereto and any written public comments; opened the
public hearing, took and considered public testimony both for
and against the proposal, closed the public hearing, and reached
a decision on this matter; and
WHEREAS, the City Council concurs with the Community
Development Director's determination that this project is
Categorically Exempt from the provisions of CEQA pursuant to
Section 15303 as a Class 3 exemption for the new construction or
conversion of small structures.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1.
the information
Commission's rE
testimony, the
accordance with
Code:
PLANNED DEVELOPMENT
set forth in the
commendation, and
City Council makes
Section 17.44.040(C)
PERMIT FINDINGS: Based upon
staff report, the Planning
oral and written public
the following findings in
of the Moorpark Municipal
sa 1Z*"
Resolution No. 2005 -
Page 2
A. The site design, including structure location, size,
height, setbacks, massing, scale, architectural style and
colors and landscaping is consistent with the provisions of
the General Plan, any applicable Specific Plans, zoning
ordinance and any other applicable regulations with the
approval of an Administrative Exception for the reduction
of the front yard setback in that the proposed industrial
use is a planned and permitted use for the site.
B. The site design would not create negative impacts on or
impair the utility of properties, structures or uses in the
surrounding area, in that the proposed industrial building
provides sufficient parking and loading spaces on site and
is situated in an area planned for industrial uses.
C. The proposed uses are compatible with existing and
permitted uses in the surrounding area, in that the
proposed industrial building is consistent with other
similar projects approved within the city.
SECTION 2. ADMINISTRATIVE EXCEPTION FINDINGS: Based upon
the information set forth in the staff report, the Planning
Commission's recommendation, and oral and written public
testimony, the City Council makes the following findings in
accordance with Section 17.44.040(F) of the Moorpark Municipal
Code:
A. The granting of the exception will not create negative
impacts to abutting properties in that the setback
reduction would not affect access, visibility, or use of
abutting properties.
B. The strict application of the zoning regulations as they
apply to the subject property will result in practical
difficulties or unnecessary hardships inconsistent with the
general purpose of such regulations in that the proposed
design provides for a viable industrial building with
adequate parking and loading spaces which would be
difficult to achieve without the minor encroachment into
the front setback where the cul -de -sac bulb curves inward
at the front property line.
C. The granting of the exception is consistent with the
General Plan in that industrial uses have been envisioned
for this site, and the proposed use and structure meet all
applicable goals and policies of the General Plan.
� 4-% 11
Resolution No. 2005 -
Page 3
SECTION 3. CITY COUNCIL APPROVAL: The City Council hereby
approves Industrial Planned Development Permit No. 2005 -01,
subject to Standard Conditions of Approval attached hereto and
incorporated herein as Exhibit A to become effective upon
approval of Administrative Exception No. 2005 -01 and direct the
Community Development Director to approve Administrative
Exception No. 2005 -01.
SECTION 4. The City Clerk shall certify to the adoption of
this resolution and shall cause a certified resolution to be
filed in the book of original resolutions.
PASSED AND ADOPTED this 18th day of May, 2005.
Patrick Hunter, Mayor
ATTEST:
Deborah S. Traffenstedt, City Clerk
Attachment:
Exhibit A - Standard Conditions of Approval for Industrial
Planned Development Permit No. 2005 -01
Resolution No. 2005 -
Page 4
EXHIBIT A
STANDARD CONDITIONS OF APPROVAL
FOR
INDUSTRIAL PLANNED DEVELOPMENT PERMIT NO. 2005 -01
STANDARD CONDITIONS
A. The following conditions shall be required of all projects:
GENERAL REQUIREMENTS
1. This permit is granted for the land and project as
identified on the entitlement application and as shown on
the approved site plan and elevations on file in the
Community Development Department. The location of all site
improvements shall be as shown on the approved site plan
and elevations except or unless otherwise indicated herein
in the following conditions. Some uses may require
additional discretionary approval. A Zoning Clearance from
the Community Development Department shall be required of
all uses in any building. Based upon potential impacts, the
Community Development Department may determine that certain
uses will require additional environmental documentation.
2. This planned development permit shall expire one (1) year
from the date of its approval unless the use has been
inaugurated by issuance of a building permit for
construction. The Community Development Director may, at
his /her discretion, grant up to two (2) additional one -year
extensions for use inauguration of the development permit,
if there have been no changes in the adjacent areas and if
the applicant can document that he /she has diligently
worked towards use inauguration during the initial period
of time. The request for extension of this planned
development permit shall be made in writing, at least
thirty (30) days prior to the expiration date of the permit
and shall be accompanied by applicable entitlement
processing deposits.
3. The applicant shall defend, indemnify and hold harmless the
City and its agents, officers and employees from any claim,
action or proceeding against the City or its agents,
officers or employees to attack, set aside, void, or annul
any approval by the City or any of its agencies,
departments, commissions, agents, officers, or employees
concerning this entitlement approval, which claim, action
Resolution No. 2005 -
Page 5
or proceeding is brought within the time period provided
therefore in Government Code Section 66499.37 or other
sections of state law as applicable. The City will promptly
notify the applicant of any such claim, action or
proceeding, and, if the City should fail to do so or should
fail to cooperate fully in the defense, the applicant shall
not thereafter be responsible to defend, indemnify and hold
harmless the City or its agents, officers and employees
pursuant to this condition.
a. The City may, within its unlimited discretion,
participate in the defense of any such claim, action
or proceeding if both of the following occur:
i. The City bears its own attorney fees and costs;
ii. The City defends the claim, action or proceeding
in good faith.
b. The applicant shall not be required to pay or perform
any settlement of such claim, action or proceeding
unless the settlement is approved by the applicant.
The applicant's obligations under this condition shall
apply regardless of whether a building permit is
issued pursuant to the planned development permit.
4. Conditions of this entitlement shall not be interpreted as
permitting or requiring any violation of law or any
unlawful rules or regulations or orders of an authorized
governmental agency.
5. If any archeological or historical finds are uncovered
during grading or excavation operations, all grading or
excavation shall cease in the immediate area and the find
shall be left untouched. The applicant shall assure the
preservation of the site and immediately contact the
Community Development Director informing the Director of
the find. The applicant shall be required to obtain the
services of a qualified paleontologist or archeologist,
whichever is appropriate to recommend disposition of the
site. The paleontologist or archeologist selected shall be
approved by the Community Development Director. The
applicant shall pay for all costs associated with the
investigation and disposition of the find.
6. If any of the conditions or limitations of this approval
are held to be invalid, that holding shall not invalidate
any of the remaining conditions or limitations set forth.
Resolution No. 2005 -
Page 6
7. All facilities and uses, other than those specifically
requested in the application and those accessory uses
allowed by the Municipal Code, are prohibited unless
otherwise permitted through application for Modification
consistent with the requirements of the zone and the design
guidelines.
FEES
8. Entitlement Processing: Prior to the issuance of any
Zoning Clearance, entitlement, building permit, grading
permit, or advanced grading permit the applicant shall
submit to the Community Development Department all
outstanding entitlement case processing fees, including all
applicable City legal service fees. This payment shall be
made within sixty (60) calendar days of approval of this
Planned Development Permit.
9. Condition Compliance: Prior to the issuance of any Zoning
Clearance, building permit, grading permit, or advanced
grading permit, the applicant shall submit to the Community
Development Department the Condition Compliance review
deposit.
10. Capital Improvements and Facilities, and Processing: Prior
to the issuance of any Zoning Clearance, the applicant
shall submit to the Community Development Department,
capital improvement, development, and processing fees at
the current rate in effect. Said fees include, but are not
limited to building and public improvement plan checks and
permits. Unless specifically exempted by City Council, the
applicant is subject to all fees imposed by the City as of
the issuance of the first permit for construction and such
future fees imposed as determined by City in its sole
discretion so long as said fee is imposed on similarly
situated properties.
11. Parks: Prior to issuance of a Zoning Clearance for a
building permit, the applicant shall submit to the
Community Development Department Park and Recreation Fees
of $0.50 per square foot of building area.
12. Tree and Landscape: Prior to or concurrently with the
issuance of a building permit, the Tree and Landscape Fee
shall be paid to the Building and Safety Division. The fee
shall be paid in accordance with City Council adopted Tree
and Landscape Fee requirements in effect at the time of
building permit application.
n14
Resolution No. 2005 -
Page 7
13. Fire Protection Facilities: Prior to or concurrently with
the issuance of a building permit, current Fire Protection
Facilities Fees shall be paid to the Building and Safety
Division. The fee shall be paid in accordance with City
Council adopted Fire Protection Facilities Fee requirements
in effect at the time of building permit application.
14. Library Facilities: Prior to or concurrently with the
issuance of a building permit, the Library Facilities Fee
shall be paid to the Building and Safety Division. The fee
shall be paid in accordance with City Council adopted
Library Facilities Fee requirements in effect at the time
of building permit application.
15. Police Facilities: Prior to or concurrently with the
issuance of a building permit, the Police Facilities Fee
shall be paid to the Building and Safety Division. The fee
shall be paid in accordance with City Council adopted
Police Facilities Fee requirements in effect at the time of
building permit application.
16. Traffic Systems Management: Prior to the issuance of a
Zoning Clearance for each building permit, the applicant
shall submit to the Community Development Department the
established Moorpark Traffic Systems Management (TSM) Fee
of twenty- five -cents ($0.25) per square foot of building
area for the approved development consistent with adopted
City policy for calculating such fee.
17. Intersection Improvements: Prior to issuance of the first
Zoning Clearance for a building permit, the applicant shall
submit to the Community Development Department a fair -share
contribution for intersection improvements relating to the
project. The level of fair -share participation will be to
the satisfaction of the City Engineer based on the traffic
report prepared for the project and the extent of the
impact to these intersections, if any.
18. Citywide Traffic: Prior to issuance of a Zoning Clearance
for each building permit, the applicant shall submit to the
Community Development Department the Citywide Traffic Fee.
The fee shall be calculated at fifty -cents ($0.50) per
square foot of gross building area. Commencing on the
first of the year of this approval, and annually
thereafter, the fee shall be increased to reflect the
change in the Caltrans Highway Bid Price (OR Engineering
News Record Construction Index) for the twelve (12) month
period available on December 31 of the preceding year
l
Resolution No. 2005 -
Page 8
( "annual indexing ") . In the event there is a decrease in
the referenced Index for any annual indexing, the current
amount of the fee shall remain until such time as the next
subsequent annual indexing which results in an increase.
19. Area of Contribution: Prior to the issuance of a Zoning
Clearance for each building permit, the applicant shall pay
to the Community Development Department the Area of
Contribution (AOC) Fee for the area in which the project is
located. The fee shall be paid in accordance with City
Council adopted AOC fee requirements in effect at the time
of building permit application.
20. Street Lighting Energy Costs: Prior to issuance of Zoning
Clearance for building permit, the applicant shall pay to
the Community Development Department all energy costs
associated with public street lighting for a period of one
year from the acceptance of the street improvements.
21. Schools: Prior to issuance of building permits for each
building, the applicant shall provide written proof to the
Community Development Department that all legally mandated
school impact fees applicable at the time of issuance of a
building permit have been paid to the Moorpark Unified
School District.
22. Art in Public Places: Prior to issuance of a Zoning
Clearance for building permit, the applicant shall
contribute to the Art in Public Places Fund in the amount
of $0.10 per each square foot of building area, to be
submitted to the Community Development Department. If the
applicant is required to provide a public art project on or
off -site in- lieu -of contributing to the Art in Public
Places Fund the art work shall have a value corresponding
to or greater than the contribution, and shall be
constructed prior to Final Occupancy of the first building.
All art shall require approval by the Arts Committee prior
to construction.
0 0 0 O+I
Resolution No. 2005 -
Page 9
B. Please contact the PLANNING DIVISION for compliance with
the following conditions:
DEVELOPMENT REQUIREMENTS
23. Prior to the issuance of a Certificate of Occupancy for any
building, the applicant shall submit a Master Sign Program
to the Community Development Director for review and
approval. The Master Sign Program shall be designed to
provide comprehensive on -site sign arrangement and design
consistent with the industrial center architecture and the
City's Sign Ordinance requirements.
24. For all flat roofed portions of buildings, a minimum
eighteen (18 ") inch parapet wall above the highest point of
the flat roof shall be utilized on all sides.
25. Skylights are prohibited unless approved through the
Planned Development Permit process or as a Modification to
the Planned Development Permit.
26. Exterior downspouts shall not be permitted unless designed
as an integral part of the overall architecture.
27. Ground - mounted equipment is preferred. Roof - mounted
equipment that cannot be ground- mounted may be approved by
the Community Development Director. In no event shall roof -
mounted equipment (vents, stacks, blowers, air conditioning
equipment, etc.) be allowed unless architecturally screened
from view on all four sides and painted to match the roof.
All screening shall be maintained for the life of the
permit.
28. Roof - mounted equipment and other noise generation sources
on -site shall be attenuated to 45 decibels (dBA) or to the
ambient noise level at the property line measured at the
time of the occupancy. Prior to the issuance of a Zoning
Clearance for initial occupancy or any subsequent
occupancy, the Community Development Director may request
that a noise study be submitted for review and approval
which demonstrates that all on -site noise generation
sources are mitigated to the required level. The noise
study must be prepared by a licensed acoustical engineer in
accordance with accepted engineering standards.
29. Any outdoor ground level equipment, facilities or storage
areas including, but not limited to loading docks, trash
enclosures, cooling towers, generators, shall be
Wf�i$) "nIq
i3 ',� 1 0 au w.
Resolution No. 2005 -
Page 10
architecturally screened fr
landscaping as determined
Director.
30. A utility room with common
the roof access ladder
alternative is approved
Director.
om view with masonry wall and /or
by the Community Development
access to house all meters and
shall be provided unless an
by the Community Development
31. No exterior access ladders of any kind to the roof shall be
permitted.
32. Parking areas shall be developed and maintained in
accordance with the requirements of the Moorpark Municipal
Code. All parking space and loading bay striping shall be
maintained so that it remains clearly visible during the
life of the development.
33. A Zoning Clearance shall be required for any re- striping of
the parking area. All disabled parking spaces and paths of
travel shall be re- striped and maintained in their original
approved locations.
34. All parking areas shall be surfaced with asphalt or
concrete and shall include adequate provisions for
drainage, striping and appropriate wheel blocks, curbs, or
posts in parking areas adjacent to landscaped areas. All
parking and loading areas shall be maintained at all times
to insure safe access and use by employees, public agencies
and service vehicles.
35. The Building Plans shall be in substantial conformance to
the plans approved under this permit and shall specifically
reflect the following:
a. Transformer and cross connection water control devices
(subject to approval by Ventura County Waterworks
District No. 1) shall be shown on the site plan and
landscaping and irrigation plan and screened from
street view with masonry wall and /or landscaping as
determined by the Community Development Director.
b. Bicycle racks or storage facilities, in quantities as
required by the Community Development Director.
C. Required loading areas with 45 -foot turning radii
shall be provided for loading zones consistent with
the AASHO WB -50 design vehicle and as required by the
Community Development Director. If drains from the
loading area are connected to the sewer system, they
Resolution No. 2005 -
Page 11
are subject to the approval of Ventura County
Waterworks District No. 1.
d. Final exterior building materials and paint colors
shall be consistent with the approved plans under this
permit. Any changes to the building materials and
paint colors are subject to the review and approval of
the Community Development Director.
e. All exterior metal building surfaces, including
roofing, shall be coated or sealed with rust
inhibitive paint to prevent corrosion and release of
metal contaminants into the storm drain system.
f. Trash disposal and recycling areas shall be provided
in a location which will not interfere with
circulation, parking or access to the building. The
final design and location of the trash enclosures
shall be subject to review and approval of the
Community Development Director and the City's Solid
Waste Management staff prior to the issuance of a
building permit. Trash areas and recycling bins shall
be depicted on the final construction plans, the size
of which shall be approved by the Community
Development Director and the City's Solid Waste
Management staff. If drains from the disposal and
recycling areas are connected to the sewer system,
they are subject to the approval of Ventura County
Waterworks District No. 1.
36. Prior to issuance of a Zoning Clearance for final building
permit (occupancy), the applicant shall install U.S. Postal
Service approved mailboxes in accordance with the
requirements of the local Postmaster.
37. Any expansion, alteration or change in architectural
elements requires prior approval of the Community
Development Director. Those changes in architectural
elements that the Director determines would be visible from
abutting street(s) shall only be allowed, if, in the
judgment of the Community Development Director such change
is compatible with the surrounding area. Any approval
granted by the Director shall be consistent with the
approved Design Guidelines (if any) for the Planned
Development Permit and applicable Zoning Code requirements.
0�0'
�w3
Resolution No. 2005 -
Page 12
OPERATIONAL REQUIREMENTS
38. Loading and unloading operations shall
between the hours of 10:00 p.m. and
approved by the City Council.
39. All uses and activities shall be con
building(s) unless otherwise authorized
Development Director and consistent with
Code provisions.
not be conducted
6:00 a.m. unless
ducted inside the
by the Community
applicable Zoning
40. Prior to the issuance of a Zoning Clearance for any use
which requires handling of hazardous or potentially
hazardous materials, the applicant shall provide proof that
he /she has obtained the necessary permits from Ventura
County Environmental Health Division. Should the Community
Development Director determine that a compatibility study
is required; the applicant shall apply for a Modification
to the Planned Development Permit.
41. The applicant agrees not to protest the formation of an
underground Utility Assessment District.
42. The continued maintenance of the permit area and facilities
shall be subject to periodic inspection by the City. The
Applicant and his /her successors, heirs, and assigns shall
be required to remedy any defects in ground or building
maintenance, as indicated by the City within five (5) days
after notification.
43. No noxious odors shall be generated from any use on the
subject site.
44. The applicant and his /her successors, heirs, and assigns
shall remove any graffiti within five (5) days from written
notification by the City of Moorpark. All such graffiti
removal shall be accomplished to the satisfaction of the
Community Development Director.
45. Should this project not continue to meet these Conditions
of Approval, the Community Development Director may declare
the project not to be in compliance, or the Director may
declare, for some other just cause, the project to be a
public nuisance. The applicant shall be liable to the City
for any and all costs and expenses to the City involved in
thereafter abating the nuisance and in obtaining compliance
with the Conditions of Approval or applicable codes. If the
applicant fails to pay all City costs related to this
action, the City may enact special assessment proceedings
`��01�2
l3tiyva..ry
Resolution No. 2005 -
Page 13
against the parcel of land upon which the nuisance existed
(Municipal Code Section 1.12.080).
46. Prior to the issuance of a Zoning Clearance for tenant
occupancy, the prospective tenant shall obtain a Business
Registration Permit from the City of Moorpark. All
contractors doing work in Moorpark shall have or obtain a
current Business Registration Permit.
47. Prior to occupancy of any of the buildings, the applicant
shall request that the City Council approve a resolution to
enforce Vehicle Codes on the subject property as permitted
by the Vehicle Code.
48. Prior to or concurrently with the issuance of a Zoning
Clearance for a grading permit, the applicant shall submit
the construction phasing plan for approval by the Community
Development Director. Phasing shall avoid, to the extent
possible, construction traffic impacts to existing adjacent
residential, commercial and industrial areas, if any.
49. Prior to issuance of Zoning Clearance for the first
building permit, the applicant shall submit a Waste
Reduction and Recycling Plan to the City's Solid Waste
Management staff and the Community Development Director for
review and approval. The Plan shall include a designated
building manager, who is responsible for initiating on -site
waste materials recycling programs, including acquiring
storage bins for the separation of recyclable materials and
coordination and maintenance of a curbside pickup schedule.
50. The building manager or designee shall be required to
conduct a routine on -site waste management education
program to educating and alerting employees and /or
residents to any new developments or requirements for solid
waste management. This condition shall be coordinated
through the City's Solid Waste Management staff.
LANDSCAPING, LIGHTING AND MAINTENANCE REQUIREMENTS
51. Prior to the issuance of a Zoning Clearance for building
permits, the applicant shall submit to the Community
Development Director for review and approval, with the
required deposit, three (3) full sets of Landscaping and
Irrigation Plans prepared by a licensed landscape architect
and drawn on the final grading plan in conformance with the
City of Moorpark Landscape Guidelines and policies;
including, but not limited to, all specifications and
details and maintenance plan. Fences and walls shall be
0001wwO
Resolution No. 2005 -
Page 14
shown on the Landscape and Irrigation Plans, including
connection, at the applicant's expense, of property line
walls with existing fences and or walls on any adjacent
residential, commercial or industrial properties. The plan
shall maintain proper vehicle sight distances subject to
the review of the City Engineer, and encompass all required
planting areas consistent with these Conditions of
Approval. Review by the City's Landscape Architect
Consultant and City Engineer, and approval by the Community
Development Director prior to issuance of a Zoning
Clearance for building permit, is required.
52. Prior to or concurrently with the submittal of the
landscape and irrigation plan, a lighting plan, along with
required deposit, shall be submitted to the Community
Development Director for review and approval. The lighting
plan, prepared by an electrical engineer registered in the
State of California, shall be in conformance with the
Moorpark Municipal Code.
53. Unless otherwise stipulated in the Special Conditions of
Approval, the applicant shall be responsible for the
maintenance of any and all parkway landscaping (hereinafter
"Parkway Landscaping ") constructed by the project, whether
said Parkway Landscaping is within the street right -of -way
or outside of the street right -of -way. Any Parkway
Landscaping situated outside of the street right -of -way
shall be within a landscape easement [herein "Landscape
Easement "].
54. Unless otherwise stipulated in the Special Conditions of
Approval, all required on -site drainage improvements and /or
stormwater quality [NPDES] features or facilities [herein
"Drainage Improvements "] shall be maintained by the Private
Responsible Party.
55. Tree pruning, consisting of trimming to limit the height
and /or width of tree canopy and resulting in a reduction of
required shade coverage for the parking lot area, is
prohibited and will be considered a violation of the
Conditions of Approval.
56. When available, use of reclaimed water
for landscape areas subject to the
Community Development Director, the
Ventura County Waterworks District No. 1.
shall be required
approval of the
City Engineer and
000101.0wJ
Resolution No. 2005 -
Page 15
57. Landscaped areas shall be designed with efficient
irrigation to reduce runoff and promote surface filtration
and minimize the use of fertilizers and pesticides, which
can contribute to urban runoff pollution. Parking and
associated drive areas with five (5) or more spaces shall
be designed to minimize degradation of storm water quality.
Best Management Practices landscaped areas for infiltration
and biological remediation or approved equals, shall be
installed to intercept and effectively prohibit pollutants
from discharging to the storm drain system. The design
shall be submitted to the City Engineer for review and
approval prior to the issuance of a building permit.
58. All landscaping shall be maintained in a healthy and
thriving condition, free of weeds, litter and debris.
59. Prior to the issuance of Zoning Clearance for occupancy,
all fences /walls along lot boundaries shall be in place,
unless an alternative installation is approved by the
Community Development Director.
C. Please contact the ENGINEERING DEPARTMENT for compliance
with the following conditions:
GENERAL
60. Trash enclosures and /or open recycling areas shall be
designed to have a cover, a drain to the sanitary sewer,
impermeable pavement, and designed so no other area drains
into it. The design shall meet the standards for the City
of Moorpark and as approved by the City Engineer and
Ventura County Waterworks District No. 1.
61. All on -site storm drains shall be cleaned at least twice a
year, once immediately prior to October 1st (the rainy
season) and once in January. The City Engineer may require
additional cleaning depending upon site and weather
conditions.
62. All paved surfaces; including, but not limited to, the
parking area and aisles, drive - through lanes, on -site
walkways shall be maintained free of litter /debris.
Walkways, parking areas and aisles and drive - through lanes
shall be swept, washed or vacuumed regularly. When swept or
washed, debris shall be trapped and collected to prevent
entry to the storm drain system in accordance with the
requirements of the National Pollution Discharge
Elimination System (NPDES).
0 C 41� eo
Resolution No. 2005 -
Page 16
63. Prior to improvement plan approval, the applicant shall
obtain the written approval on the improvement plans Mylar®
sheets for the location of fire hydrants by the Ventura
County Fire Prevention Division. (Water and Sewer
improvements plans shall be submitted to Ventura County
Waterworks District No. 1 for approval.)
64. Prior to any work being conducted within any State, County,
or City right -of -way, the applicant shall obtain all
necessary encroachment permits from the appropriate
agencies and provide copies of these approved permits and
the plans associated with the permits to the City Engineer.
65. Reactive organic compounds, Nitrogen oxides (ozone /smog
precursor), and particulate matter (aerosols /dust)
generated during construction operations shall be minimized
in accordance with the City of Moorpark standards and the
standards of the Ventura County Air Pollution Control
District (APCD). When an air pollution Health Advisory has
been issued, construction equipment operations (including
but not limited to grading, excavating, earthmoving,
trenching, material hauling, and roadway construction) and
related activities shall cease in order to minimize
associated air pollutant emissions.
66. The applicant shall comply with Chapters 9.28, 10.04,
12.24, 17.53 of the Moorpark Municipal Code standard
requirements for construction noise reduction.
67. The applicant shall utilize all prudent and reasonable
measures (including installation of a 6 -foot high chain
link fence around the construction sites or provision of a
full time licensed security guard) to prevent unauthorized
persons from entering the work site at any time and to
protect the public from accidents and injury.
68. The applicant shall observe a 15 -mile per hour speed limit
for the construction area.
69. The applicant shall comply with the City of Moorpark
standard requirements for temporary storm water diversion
structures during construction and grading.
GRADING
70. Prior to the issuance of a grading permit (should an early
grading agreement be approved for this project) or prior to
Final Map, the applicant shall post sufficient surety, in a
form acceptable to the City Engineer, guaranteeing
V V ry ►..o
Resolution No. 2005 -
Page 17
completion of all onsite and off -site improvements required
by these Conditions of Approval or the Municipal Code
including, but not limited to grading, street improvements,
storm drain improvements, temporary and permanent best
management practices for the control of non -point water
discharges, landscaping, fencing, and bridges. Grading and
improvements shall be designed, bonded and constructed as a
single project.
71. Prior to the issuance of a grading permit (should an early
grading agreement be approved for this project) or prior to
Final Map, whichever occurs first, the applicant shall
provide written proof to the City Engineer that any and all
wells that may exist or have existed within the project
have been properly sealed or have been destroyed or
abandoned per Ventura County Ordinance No. 2372 or
Ordinance No. 3991 and per Division of Oil and Gas
requirements.
72. If any hazardous waste or material is encountered during
the construction of this project, all work shall be
immediately stopped and the Ventura County Environmental
Health Department, the Fire Protection District, the
Sheriff's Department, and the City Engineer shall be
notified immediately. Work shall not proceed until
clearance has been issued by all of these agencies.
73. All grading and drainage plans are subject to review of the
City Engineer. The plans shall be prepared by appropriately
registered professional engineers.
74. Prior to issuance of the grading permit, the applicant
shall provide a grading remediation plan and report for
approval of the City Engineer. The report shall evaluate
all major graded slopes and open space hillsides whose
performance could effect planned improvements. The slope
stability analysis shall be performed for both static and
dynamic conditions using an appropriate pseudo- static
horizontal ground acceleration coefficient for earthquakes
on faults capable of impacting the in accordance with
standard practice as outlined in DMG Special Pub. 117,
1997.
75. During grading, the geotechnical engineer shall observe and
approve all keyway excavations, removal of fill and
landslide materials down to stable bedrock or in -place
material, and installation of all subdrains including their
connections. All fill slope construction shall be observed
0 01#20 020
Resolution No. 2005 -
Page 18
and tested by the project geotechnical engineer, and the
density test results and reports submitted to the City
Engineer to be kept on file. Cuts and slopes shall be
observed and mapped by the project geotechnical and civil
engineers who will provide any required slope modification
recommendations based on the actual geologic conditions
encountered during grading. Written approval from the City
Engineer shall be obtained prior to any modification.
76. Weekly progress reports and a grading completion report
shall be submitted to the City Engineer by the project
geotechnical engineers. These reports shall include the
results and locations of all compaction tests, as -built
plans of all landslide repairs and fill removal, including
geologic mapping of the exposed geology of all excavations
showing cut cross - sections and sub -drain depths and
locations. The lists of excavations approved by the
engineering geologist shall also be submitted. Building
permits shall not be issued without documentation that the
grading and other pertinent work has been performed in
accordance with the geotechnical report criteria and
applicable Grading Ordinance provisions.
77. During grading, colluvial soils and landslide deposits
within developed portions of the properties shall be re-
graded to effectively remove the potential for seismically
induced landslides in these materials. Additional
buttressing, keying and installation of debris benches
shall be provided in transition areas between non - graded
areas and development as recommended in the final
geotechnical reports of the project geotechnical engineer.
78. Prior to issuance of the grading permit, the geotechnical
engineer shall evaluate liquefaction potential. Where
liquefaction is found to be a hazard, the remediation plan
shall provide effective measures to avoid and control
damage. During construction, measures to reduce seismic
liquefaction risks shall be employed as recommended in the
approved remediation plan and associated geotechnical
report, such as placement of a non - liquefiable cap over the
alluvium, removal of the liquefiable soils, in -situ
densification, or the excavation of a shear key below the
base of the liquefiable zone.
79. The recommendations for site grading contained in the final
geotechnical reports shall be followed during grading
unless modifications are submitted for approval by the
0�C)w:� J
Resolution No. 2005 -
Page 19
engineers -of -work and specifically approved in writing by
the City Engineer.
80. Engineered fills shall be constructed to comply with the
standards and criteria presented in the approved
geotechnical report. The differential thickness of the fill
under individual buildings shall be ten feet or less. These
measures shall be verified by construction observation and
testing by the project geotechnical engineer as outlined in
the final geotechnical reports.
81. Additional analysis of the predicted total and differential
settlements of the major fills at each site shall be
performed by the project geotechnical engineer during the
final design stage. Possible measures such as surcharging,
delaying construction for a period of time before
constructing on deep fills, or allowing for the predicted
settlement in the design of the project components may be
required based on the settlement data.
82. Consistent with the final geotechnical reports, at a
minimum the following measures shall be implemented during
design and construction where appropriate to minimize
expansive soil effects on structures. Potential foundation
systems to include pier and grade beam; use of structural
concrete mats and post- tensioned slabs; pad overcutting to
provide uniform swell potential; and soil subgrade moisture
treatment.
83. Prior to issuance of building permits, chemical testing of
representative building pad soils shall be submitted to
determine the level of corrosion protection required for
steel and concrete materials used for construction. The
following measures shall be implemented where appropriate
to protect against corrosion: use of sulfate - resistant
concrete and use of protective linings to encase metallic
piping buried in soils warranting such measures.
84. Prior to issuance of the initial grading permit, the
applicant shall hire a qualified Registered Civil Engineer
to prepare Erosion and Sediment Control Plans in
conformance with Ventura County NPDES Permit No. CAS
004002. These Plans shall address, but not be limited to
construction impacts and long -term operational effects on
downstream environments and watersheds. The Plans shall
consider all relevant NPDES requirements and
recommendations for the use of best available technology
and specific erosion control measures, including temporary
0 ve *31
Resolution No. 2005 -
Page 20
measures during construction, to minimize water quality
effects to the maximum extent practicable. Prior to the
issuance of the initial grading permit review and approval
by the Community Development Director and City Engineer
shall be required.
85. Prior to the import or export of any dirt a Haul Route
Permit shall be required in conformance with the City of
Moorpark standard requirements.
86. Temporary irrigation, hydroseeding and erosion control
measures shall be implemented on all temporary grading.
Temporary grading is defined to be any grading partially
completed and any disturbance of existing natural
conditions due to construction activity. These measures
will apply to a temporary or permanent grading activity
that remains or is anticipated to remain unfinished or
undisturbed in its altered condition for a period of time
greater than thirty (30) days except that during the rainy
season these measures will be implemented immediately.
87. The maximum gradient for any slope shall not exceed a 2:1
(h:v) slope inclination except where special circumstances
exist. In the case of special circumstances where steeper
slopes are warranted, a registered soils engineer and a
licensed landscape architect will review plans and their
recommendations will be subject to the review and approval
of the City Engineer and the Community Development
Director.
88. All graded slopes steeper that 5:1 (h:v) shall have soil
amendments added, irrigation systems installed and be
planted in a timely manner with groundcover, trees and
shrubs (consistent with the approved landscape and
irrigation plans) that will stabilize slopes and minimize
erosion. Timely manner means that the slope soil
amendments, irrigation systems and planting on each slope
shall commence immediately upon the completion of the
grading of each slope, that the completion of slope grading
will not be artificially delayed and that the slope soil
amendments, irrigation systems and planting shall be
completed on a schedule commensurate with the grading. The
planting will be to the satisfaction of the Community
Development Director and the City Engineer.
89. Prior to approval of the grading plan, slough walls,
approximately eighteen (18 ") inches high, with curb outlet
drainage complying with requirements for NPDES Best
0 ,�., ( ) rte, - {)
Resolution No. 2005 -
Page 21
Management Practices shall be shown on the grading plans at
all areas behind the back of the sidewalk where slopes
exceeding 4 -feet in height are adjacent to the sidewalk and
constructed outside the street easement. A V -ditch shall be
provided behind the slough wall. The applicant shall use
the City's standard slough wall detail. Construction
details and materials shall be to the satisfaction of the
City Engineer and Community Development Director.
90. Grading may occur during the rainy season from October lst
to April 15th, subject to written approval by the City
Engineer and timely installation of erosion control
facilities. Erosion control measures shall be in place and
functional between October lst and April 15th. In order to
start, or continue, grading operations between October lst
and April 15th, erosion control plans that are project
progress specific and that provide detailed best management
practices for erosion control during the rainy season shall
be submitted to the City Engineer no later than September
lst of each year that grading is in progress. No grading
during the rainy season shall be permitted unless the City
Engineer has approved erosion control plans required
herein. During site preparation and construction, the
contractor shall minimize disturbance of natural
groundcover on the project site until such activity is
required for grading and construction purposes. During the
rainy season, October 1 through April 15, all graded slopes
shall be covered with a woven artificial covering
immediately after completion of each graded slope. Grading
operations shall cease if the applicant fails to place
effective best management measures on graded slopes
immediately after construction. No slopes shall be graded
or otherwise created when the three -day forecast for rain
is twenty percent, or greater, unless the applicant is
prepared to cover the permanent and temporary slopes before
the rain event. The artificial covering and planting will
be to the satisfaction of the Community Development
Director and the City Engineer.
91. During clearing, grading, earth moving, excavation, soil
import and soil export operations the applicant shall
comply with the City of Moorpark standard requirements for
watering and dust control.
0 �`�3
`v' v.r
Resolution No. 2005 -
Page 22
92. Backfill of any pipe or conduit shall be in 4 -inch fully
compacted layers unless otherwise specified, in writing, by
the City Engineer.
93. Soil testing for trench compaction shall be performed on
all trenching and shall be done not less than once every
two feet (2') of lift and one - hundred lineal feet (100') of
trench excavated. Test locations shall be noted using true
elevations and street stationing with offsets from street
centerlines.
94. Concurrent with submittal of grading plans the applicant
shall submit a geotechnical report in accordance with State
law and the City of Moorpark standard requirements.
95. Prior to issuance of each building permit an as- graded
geotechnical report and a rough grading certification for
said lot shall be submitted by the Geotechnical Engineer
for the approval of the City Engineer.
96. Prior to the approval of grading plans the applicant shall
include on the grading plans entry walls and project
identification signs in accordance with City standards.
Landscaping, appropriate to the entry, shall be provided
that will not interfere with sight- distance or turning
movement operations. The final design for the project
entrance shall be reviewed and approved by the Community
Development Director and the City Engineer.
97. At least one week prior to commencement of grading or
construction, the applicant shall prepare a notice that
grading or construction work will commence. This notice
shall be posted at the site and mailed to all owners and
occupants of property within 500 feet of the exterior
boundary of the project site as shown, on the latest
equalized assessment roll. The list shall be kept current
at all times and shall consist of persons with authority to
indicate and implement corrective action in their area of
responsibility, including the name of the contact
responsible for maintaining the list. The names of
individuals responsible for noise and litter control, tree
protection, construction traffic and vehicles, erosion
control, and the 24 -hour emergency number, shall be
expressly identified in the notice. The notice shall be re-
issued with each phase of major grading and construction
activity. A copy of all notices shall be concurrently
transmitted to the Community Development Department. The
notice shall be accompanied by a list of the names and
0C),(11 r..V 1
Resolution No. 2005 -
Page 23
addresses of the property owners noticed, and a map
identifying the area noticed.
PUBLIC AND PRIVATE STREETS
98. Prior to construction of any civil improvement the
applicant shall submit for review and approval, street
improvement plans prepared by a California Registered Civil
Engineer, enter into an agreement with the City of Moorpark
to complete public improvements and post sufficient surety
guaranteeing the construction of all improvements. Unless
specifically noted in these Standard Conditions or attached
Special Conditions all streets shall conform to the design
requirements of the Ventura County Road Standards (most
recent edition) and the policies of the City of Moorpark
(most recent version), including all applicable American
Disabilities Act (ADA) requirements. Street improvement
design and construction shall be acceptable to the City
Engineer and Community Development Director.
99. Above ground obstructions (utility cabinets, mailboxes,
etc.) shall be placed within the right -of -way landscaping
areas. When above ground obstructions are placed within the
sidewalk, a minimum 5.0 feet clear sidewalk width shall be
provided around the obstruction.
100. Prior to final inspection of improvements original "as
built" plans shall be certified by the applicant's
Registered Civil Engineer and submitted with three sets of
blue prints and the appropriate plan revision review fees
to the City Engineer along with electronic files in a
format satisfactory to the City Engineer. These "as built"
plans shall incorporate all plan revisions and all
construction deviations from the approved plans and
revisions thereto. The as built plans shall be `record
drawings" on 22" X 36" Mylar® sheets (made with proper
overlaps) with a City title block on each sheet. In
addition, the applicant shall provide an electronic file
update of the City's Master Base Map electronic file,
incorporating all streets, sidewalks, street lights,
traffic control facilities, street stripping, signage and
delineation, storm drainage facilities, water and sewer
mains, lines and appurtenances and any other utility
facility installed for this project.
101. The street improvement plans shall contain a surveyor's
statement on the plans, certifying that, in accordance with
Business and Professions Code 8771, all recorded monuments
0
Resolution No. 2005 -
Page 24
in the construction area will be protected in place during
construction or have been located and tied with no fewer
than four durable reference monuments which will be
protected in place during construction.
102. Prior to issuance of the first building permit all existing
and proposed utilities that are less than 67Kv shall be
under - grounded as approved by the City Engineer.
103. Prior to reduction of improvement bonds the applicant shall
submit reproducible centerline tie sheets on 3 -mil
polyester film to the City Engineer.
104. Street lights shall be provided on the improvement plans
per Ventura County Standards and as approved by the City
Engineer.
DRAINAGE AND HYDROLOGY
105. Prior to approval of a grading plan, the applicant shall
submit to the City of Moorpark for review and approval,
drainage plans; hydrologic and hydraulic calculations in a
bound and indexed report prepared by a California
Registered Civil Engineer; shall enter into an agreement
with the City of Moorpark to complete improvements and
shall post sufficient surety guaranteeing the construction
of all improvements. The plans shall depict and examine all
on -site and off -site drainage structures required by the
City Engineer.
106. The drainage plans and calculations shall analyze
conditions before and after development as well as
potential development that is shown in the General Plan.
Quantities of water, water flow rates, major watercourses,
drainage areas and patterns, diversions, collection
systems, flood hazard areas, sumps, sump locations,
detention and NPDES facilities and drainage courses shall
be addressed.
107. Hydrology shall be per the current Ventura County Flood
Control Standards except as noted herein or in the Special
Conditions.
108. A rainfall intensity Zone K shall be utilized in the design
unless alternate design intensity is approved by the City
Engineer.
109. Surface flows shall be intercepted, detained and given
sufficient time to provide stormwater clarification by
0 �C„ J
Resolution No. 2005 -
Page 25
"passive" BMP systems prior to entering collector or storm
drain systems.
110. For a 10 -year frequency storm, local, residential and
private streets shall be designed to have one dry travel
lane available on interior residential streets. Collector
streets shall be designed to have a minimum of one (1) dry
travel lane in each direction.
111. After - development, drainage to adjacent parcels shall not
be increased above pre- development drainage quantities for
any stormwater model between and including the 10 -year and
100 -year storms, nor will surface runoff be concentrated by
this development. Acceptance of storm drain waters by the
project and discharge of storm drain waters from the
project shall be in type, kind and nature of predevelopment
flows unless the affected upstream and /or downstream owners
provide permanent easement to accept such changed storm
drainage water flow. All drainage measures necessary to
mitigate stormwater flows shall be provided to the
satisfaction of the City Engineer. The applicant shall make
any on -site and downstream improvements, required by the
City, to support the proposed development.
112. Drainage grates shall not be used at any location
accessible by pedestrian, bicycle or equestrian traffic.
113. The grading plan shall show distinctive lines of inundation
delineating the 50- and 100 -year flood levels.
114. All flows that have gone through flow attenuation and
clarification by use of acceptable Best Management Practice
(BMP) systems and are flowing within brow ditches, ribbon
gutters, storm drain channels, area drains and similar
devices shall be deposited directly into the storm drain
system and shall be restricted from entering streets. If
necessary, the storm drain system shall be extended to
accept these flows. Both storm drains and easements outside
the public right -of -way are to be privately maintained
unless otherwise approved by the City Council. Subdrain
flows shall be discharged directly into the storm drain
system at an inlet or junction structure.
115. Concrete surface drainage structures exposed to the public
view, shall be tan colored concrete, as approved by the
Community Development Director, and to the extent possible
shall incorporate natural structure and landscape to reduce
their visibility.
Ul�U:'
Uc
Resolution No. 2005 -
Page 26
116. No curb outlets will be allowE
onto the street. The applicant
all future property owners that
require observance of the
notification agreement shall
property owner and recorded with
�d for pad or lot drainage
shall inform, in writing,
future private improvements
same requirements. This
be acknowledged by each
each property.
117. Drainage devices for the development shall be designed and
installed with all necessary appurtenances to safely
contain and convey storm flows to their final point of
discharge to the satisfaction of the City Engineer.
118. The applicant shall demonstrate, for each building pad
within the development area, that the following
restrictions and protections can be put in place to the
satisfaction of the City Engineer:
a. Adequate protection from a one - hundred (100) year
frequency storm;
b. Feasible access during a fifty (50) year frequency
storm;
C. Hydrology calculations shall be per current Ventura
County Watershed Protection Agency Standards and to
the satisfaction of the City Engineer; and
d. All structures proposed within the one - hundred (100
year flood zone shall be elevated at least one foot
above the one - hundred (100 year flood level.
119. The design of the storm drain system shall provide for
adequate width easements for future maintenance and
reconstruction of facilities particularly those facilities
that are deeper than eight (8') feet. In addition, all
facilities shall have all - weather vehicular access.
120. The applicant shall demonstrate, certify and provide surety
to the satisfaction of the City Engineer that all existing
storm drain culverts within the site perform in an
acceptable manner based on their intended design and the
proposed increase /decrease of loading conditions,
introduction of surface water within subsurface areas that
may affect the culvert and proposed construction.
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
121. Prior to the issuance of any construction /grading permit
and /or the commencement of any clearing, grading or
excavation, the applicant for projects with construction
0 ('11 C1 : CJS
Resolution No. 2005 -
Page 27
activities that require a grading permit shall prepare and
submit a Stormwater Pollution Control Plan ( SWPCP), on the
form established in the Ventura Countywide Stormwater
Quality Management Program. The SWPCP shall address the
construction phase compliance to stormwater quality
management regulations for the project. The SWPCP shall be
prepared by a California registered civil engineer. The
SWPCP, improvement plans and grading plans shall note that
the contractor shall comply with the California Best
Management Practices Construction Handbook, published by
the California Stormwater Quality Association. The SWPCP
shall be submitted, with appropriate review deposits, for
the review and approval of the City Engineer. The SWPCP
shall identify potential pollutant sources that may affect
the quality of discharges and to design the use and
placement of Best Management Practices (BMP's) to
effectively prohibit the entry of pollutants from the
construction site into the storm drain system during
construction. Erosion and sediment source control BMPs
shall be considered for both active and inactive
(previously disturbed) construction areas. BMPs for wind
erosion and dust control are also required.
122. The SWPCP shall require modification of BMPs as the project
progresses and as conditions warrant. The first version and
each subsequent revision of the SWPCP shall be accompanied
by a detailed project schedule that specifically identifies
the type and location of construction operations for the
project. The SWPCP shall be developed and implemented in
accordance with the Ventura Countywide Stormwater Quality
Management Program, National Pollutant Discharge
Elimination System (NPDES) Permit No. CAS004002, Chapter
8.52 of the Moorpark Municipal Code and any other
requirements established by the City. The applicant is
responsible for ensuring that all project contractors,
subcontractors, materials suppliers, tenants and tenants'
contractors comply with all BMP's applicable to the SWPCP
until such time as a notice of termination has been
approved by the City Engineer and accepted by the Los
Angeles Regional Water Quality Control Board. The SWPCP
shall require applicant to provide schedules and procedures
for onsite maintenance of earthmoving and other heavy
equipment and documentation of proper disposal of used oil
and other lubricants. The onsite maintenance of all
0'- CC -t q
Resolution No. 2005 -
Page 28
equipment that can be performed off -site will not be
allowed.
123. Prior to the issuance of any construction /grading permit
and /or the commencement of any clearing, grading or
excavation, the applicant for projects with facilities
identified as subject to the State Board General Industrial
and Commercial permits shall prepare and submit Stormwater
Pollution Prevention Plan (SWPPP) . The SWPPP shall address
the post- construction compliance to stormwater quality
management regulations for the project. A California
registered civil engineer shall prepare the SWPPP. The
SWPPP, improvement plans and grading plans shall note that
the contractor shall comply with the California Best
Management Practices New Development and Redevelopment
Handbook, published by the California Stormwater Quality
Association. The SWPPP shall comply with the Ventura
Countywide Stormwater Quality Management Program Land
Development Guidelines, Technical Guidance Manual for
Stormwater Quality Control Measures, and the Stormwater
Management Program (SMP) to develop, achieve, and implement
a timely, comprehensive, cost effective stormwater
pollution control program to reduce pollutants to the
maximum extent practicable. The SWPPP shall be prepared in
compliance with the form and format established in the
Ventura Countywide Stormwater Quality Management Program.
The SWPPP shall be submitted, with appropriate review
deposits, for the review and approval of the City Engineer.
The proposed plan shall also address all relevant NPDES
requirements, maintenance measures, estimated life spans of
best management practices facilities, operational
recommendations and recommendations for specific best
management practices technology. The use of permanent dense
ground cover planting approved by the City Engineer and
Community Development Director shall be required for all
graded slopes. Methods of protecting the planted slopes
from damage shall be included. Proposed management efforts
during the lifetime of the project shall include best
available technology. "Passive" and "natural" BMP drainage
facilities shall be provided such that surface flows are
intercepted and treated on the surface over biofilters
(grassy swales), infiltration areas and other similar
solutions. The use of filters, separators, clarifiers,
absorbents, adsorbents or similar "active" devices is not
acceptable and shall not be used. The use of biological
OOC4. io
Resolution No. 2005 -
Page 29
filtering, bio- remediation, infiltration of pre- filtered
storm water and similar measures that operate without
annual maintenance intervention, that are failsafe, that,
when maintenance is needed, will present the need for
maintenance in an obvious fashion and which will be
maintainable in a cost effective and non - disruptive fashion
is required. The SWPPP shall establish a continuing program
of monitoring, operating and maintenance to:
a. Provide discharge quality monitoring.
b. Assess impacts to receiving water quality resulting
from discharged waters.
C. Identify site pollutant sources.
d. Educate management, maintenance personnel, users, to
obtain user awareness and compliance with NPDES goals.
e. Measure management program effectiveness.
f. Investigate and implement improved BMP strategies.
g. Maintain, replace and upgrade BMP facilities.
h. Secure the funding, in perpetuity, to achieve items a
through g above.
124. Engineering and geotechnical reports shall be provided to
prove, to the satisfaction of the City Engineer, that all
"passive" NPDES facilities meet their intended use and
design. These facilities shall meet the minimum
requirements relating to water retention and clarification.
125. Both the SWPCP and the SWPPP shall be developed and
implemented in accordance with requirements of the Ventura
Countywide Stormwater Quality Management Program, Technical
Guidance Manual for Stormwater Quality Control Measures,
NPDES Permit No. CAS004002 and shall identify potential
pollutant sources that may affect the quality of discharges
to stormwater and shall include the design and placement of
recommended Best Management Practices (BMPs) to effectively
prohibit the entry of pollutants from the construction site
into the storm drain system.
126. Prior to the issuance of any construction /grading permit
and /or the commencement of any clearing, grading or
excavation, the applicant shall also submit a Notice of
Intent (NOI) to the California State Water Resources
Control Board, Stormwater Permit Unit in accordance with
the NPDES Construction General Permit (No. CASQ00002):
0 C
Resolution No. 2005 -
Page 30
Waste Discharge Requirements for Discharges of Stormwater
Runoff Associated with Construction Activities). The
applicant shall submit a copy of the Notice of Intent (NOI)
to the City Engineer's office as proof of permit
application. The applicant shall place the WDID number for
the project on the improvement plans and the grading plans.
127. The applicant shall comply with Chapter 8.52 of the
Moorpark Municipal Code.
128. Prior to City issuance of the initial grading permit, the
applicant shall obtain all necessary NPDES related permits.
129. Prior to the starting of grading or any ground disturbance
the applicant shall employ a full -time superintendent for
NPDES compliance. The NPDES superintendent shall have no
other duties than NPDES compliance, shall be present, on
the project site Monday through Friday and on all other
days when the probability of rain is 400 or higher and
prior to the start of and during all grading or clearing
operations until the release of grading bonds. The NPDES
superintendent shall have full authority to hire personnel,
bind the applicant in contracts, rent equipment and
purchase materials to the extent needed to effectuate Best
Management Practices. The NPDES superintendent shall
provide proof to the City Engineer of attendance and
satisfactory completion of courses satisfactory to the City
Engineer totaling no less than eight (8) hours directed
specifically to NPDES compliance and effective use of Best
Management Practices. Proof of such attendance and
completion shall be provided to the City Engineer prior to
employment to the NPDES superintendent. In addition, an
NPDES superintendent shall be employed to assume NPDES
compliance during the construction of streets, storm
drainage systems, all utilities, buildings and final
landscaping of the site.
D. Please contact the BUILDING DIVISION for compliance with
the following conditions:
130. Prior to the issuance of a Building Permit, the applicant
shall provide written proof that an "Unconditional Will
Serve Letter" for water and sewer service has been obtained
from the Ventura County Waterworks District No. 1.
l_%
"1 C .w - w
Resolution No. 2005 -
Page 31
E. Please contact the VENTURA COUNTY AIR POLLUTION CONTROL
DISTRICT for compliance with the following conditions:
131. Prior to issuance of a Zoning Clearance for a building
permit, a Ventura County Air Pollution Control District
(APCD) "Authority to Construct" shall be obtained for all
equipment subject to APCD Permit (see APCD Questionnaire,
AB3205). To determine if proposed new equipment or
operating processes are subject to APCD Permit
requirements, the applicant should submit a completed APCD
Questionnaire (AB3205) to the APCD. A copy of the APCD
Questionnaire can be downloaded from the APCD's website at
www.vcapcd.org. This form can be mailed to the District at
669 County Square Drive, Ventura, CA 93003, or faxed to
APCD at (805) 645 -1444. For questions about this process
the applicant may contact APCD staff at (805) 645 -1445 or
(805) 645 -1401. Final Certificate of Occupancy shall not be
granted until compliance with all applicable APCD Rules &
Regulations has been satisfactorily demonstrated.
132. Facilities shall be operated in accordance with the Rules
and Regulations of the Ventura County Air Pollution Control
District, with emphasis on Rule 51, Nuisance. Rule 51
states: "A person shall not discharge from any source
whatsoever such quantities of air contaminants or other
material which cause injury, detriment, nuisance or
annoyance to any considerable number of persons or to the
public or which endangers the comfort, repose, health or
safety of any such persons or the public or which cause or
have a natural tendency to cause injury or damage to
business or property."
F. Please contact the VENTURA COUNTY FIRE PROTECTION DISTRICT
for compliance with the following conditions:
GENERAL
133. Prior to combustible construction, an all weather access
road /driveway and the first lift of the access road
pavement shall be installed. A minimum twenty (20') foot
clear width shall remain free of obstruction during any
construction activities within the development once
combustible construction starts. All access roads /driveways
shall have a minimum vertical clearance of 13 feet 6 inches
and a minimum outside turning radius of forth (40') feet.
134. Approved turnaround areas for fire apparatus shall be
provided when dead -end Fire District access roads /driveways
0 y L�/�C�� "3
`Jw' d
Resolution No. 2005 -
Page 32
exceed 150 feet. Turnaround areas shall not exceed a five
(50) percent cross slope in any direction and shall be
located within 150 feet of the end of the access
road /driveway.
135. The access road /driveway shall be extended to within 150
feet of all portions of the exterior wall of the first
story of any building and shall be in accordance with Fire
District access standards. Where the access roadway cannot
be provided, approved fire protection system or systems
shall be installed as required and acceptable to the Fire
District.
136. When only one (1) access point is provided, the maximum
length of dead -end access roads shall not exceed eight
hundred feet (8001).
137. Public and private roads shall be named if serving more
than four (4) parcels or as required by the Fire District.
138. Approved walkways shall be provided from all building
openings to the public way or Fire District access
road /driveway.
139. Structures exceeding three stories or forty -eight (48')
feet in height shall meet current VCFPD Ordinance for
building requirements. Structures exceeding seventy -five
(75') feet in height shall be subject to Fire District high
rise building requirements.
140. Structures greater than 5,000 square feet and /or five miles
from a fire station shall be provided with an automatic
fire sprinkler system in accordance with current Ventura
County Fire Protection District Ordinance.
141. Commercial trash dumpsters and containers with an
individual capacity of 1.5 cubic yards or greater shall not
be stored or placed within five (5') feet of openings,
combustible walls, or combustible roof eave lines unless
protected by approved automatic sprinklers.
DEVELOPMENT REQUIREMENTS
142. Prior to the issuance of a Certificate of Occupancy by the
Building Division the applicant shall submit a plan to the
Fire District for review and approval indicating the method
by which this project will be addressed.
143. Minimum six (6 ") inch high address numbers shall be
installed prior to occupancy, shall be contrasting color to
0 0Cw d
Resolution No. 2005 -
Page 33
the background, and shall be readily visible at night
Brass or gold plated number shall not be used. Where
structures are set back more that 150 feet from the street,
larger numbers will be required so that they are
distinguishable from the street. In the event a
structure(s) is(are) not visible from the street, the
address numbers(s) shall be posted adjacent to the driveway
entrance on an elevated post.
144. Prior to combustible construction, fire hydrants shall be
installed to the minimum standards of the City of Moorpark
and the Fire District, and shall be in service.
145. Prior to occupancy of any structure, blue reflective
hydrant location markers shall be placed on the access
roads in accordance with Fire District standards. If the
final asphalt cap is not in place at time of occupancy,
hydrant location markers shall still be installed and shall
be replaced when the final asphalt cap is completed.
146. Prior to the issuance of a building permit, building plans
for all A, E, H, I, R -1 and R -2 Occupancies shall be
submitted, with payment for plan check, to the Fire
District for review and approval.
147. Prior to issuance of a building permit the applicant shall
submit a phasing plan and two (2) site plans (for the
review and approval of the location of fire lanes) to the
Fire District. Prior to occupancy the fire lanes shall be
posted "NO PARKING FIRE LANE TOW- AWAY" in accordance with
California Vehicle Code and the Fire District.
148. Prior to or concurrently with the issuance of a building
permit the applicant shall submit plans to the Fire
District showing the location of the existing hydrants
within three - hundred (3001) feet of the proposed project
and showing the location, type and number of proposed
hydrants, and the size of the outlets. Fire hydrant(s)
shall be provided in accordance with current adopted
edition of the Uniform Fire Code, Appendix 111 -B and
adopted amendments. On -site fire hydrants may be required
as determined by the Fire District. Fire hydrants, if
required, shall be installed and in service prior to
combustible construction and shall conform to the minimum
standard of the Ventura County Waterworks Manual and the
Fire District.
Resolution No. 2005 -
Page 34
149. Prior to installation of any fire protection system;
including, but not limited to sprinklers, dry chemical,
hood systems, the applicant shall submit plans, along with
the required fee for plan check, to the Fire District for
review and approval. Fire sprinkler systems with one -
hundred or more heads shall be supervised by a fire alarm
system in accordance with Fire District requirements.
150. Prior to installation of the required fire alarm system (if
required), the applicant shall submit plans, along with the
required fee for plan check, to the Fire District for
review and approval. The fire alarm system shall be
installed in all buildings in accordance with California
Building and Fire Code requirements.
151. Prior to the issuance of a Certificate of Occupancy by the
Building Division the applicant shall obtain all applicable
Uniform Fire Code (UFC) permits.
152. Prior to the issuance of a building permit the applicant
shall obtain a copy of Ventura County Fire District Form
No. 126 "Requirements for Construction."
153. Prior to the issuance of a Certificate of Occupancy by the
Building Division the applicant shall install fire
extinguishers in accordance with the Uniform Fire Code.
The placement of extinguishers shall be subject to review
and approval by the Fire District.
154. Prior to framing the applicant shall clear for a distance
of one - hundred (1001) feet all grass or brush exposing any
structure(s) to fire hazards.
G. Please contact the VENTURA COUNTY WATERWORKS DISTRICT NO. 1
for compliance with the following conditions:
155. The applicant shall comply with the applicable provisions
of Ventura County Waterworks District No. 1 standard
procedures for obtaining domestic water and sewer services
for applicant's projects within the District.
156. Prior to issuance of a building permit, provide Ventura
County Waterworks District:
a. Water and sewer improvement plans in the format
required.
b. Hydraulic analysis by a registered Civil Engineer to
determine the adequacy of the proposed and existing
water and sewer lines.
0 'ew yJ
Resolution No. 2005 -
Page 35
c. Copy of approval of fire hydrant locations by Ventura
County Fire Protection District.
d. Copy of District Release and Receipt from Calleguas
Municipal Water District.
e. Cost estimates for water and sewer improvements.
f. Plan check, construction inspection, capital
improvement charge, sewer connection fee and water
meter charge.
g. Signed Contract to install all improvements and a
Surety Bond.
157. At the time water service connection is made, cross
connection control devices shall be installed on the water
system in a manner approved by the Ventura County
Waterworks District No. 1.
H. Please contact the VENTURA COUNTY WATERSHED PROTECTION
DISTRICT for compliance with the following conditions:
158. No direct storm drain connections to Ventura County Flood
Control District facilities will be allowed without
appropriate Best Management Practices (BMPs) for compliance
with Ventura Countywide Stormwater Program.
I. Please contact the POLICE DEPARTMENT for compliance with
the following condition:
159. Prior to initiation of the building plan check process for
the project, the applicant shall submit plans in sufficient
detail to the Police Department for review and approval of
defensible space concepts to reduce demands on police
services. To the degree feasible and to the satisfaction of
the Community Development Director and the Police Chief,
public safety planning recommendations shall be
incorporated into the project plans. The applicant shall
prepare a list of project features and design components
that demonstrate responsiveness to defensible space design
concepts.
- END -
00c� ~