Loading...
HomeMy WebLinkAboutAGENDA REPORT 1986 0407 CC REG ITEM 11GD. WEAK Mayor THOMAS C. FERGUSON Mayor Pro Tem ALBERT PRIETO Councilmember DANNY A. WOOLARD Councilmember LETA YANCY- SUTTON Councilmember DORIS D. BANKUS City Clerk THOMAS P. GENOVESE City Treasurer MOORPARK R111:141 1.1.411.11141 D ITEM I I TO: The Honorable City Council FROM: R. Dennis Delzeit, City Engineer DATE: April 2, 1986 SUBJECT: Moorpark Avenue Pedestrian Safety Project Extra Work at the Northwest Corner of Moorpark Avenue and High Street LOA t _ STEVEN KUENY City Manager CHERYL J. KANE City Attorney RICHARD MORTON Director of Community Development R. DENNIS DELZEIT City Engineer JOHN V. GILLESPIE Chief of Police As previously requested, we have met with the project contractor, Sully- Miller Contracting Company, to review their estimate for the extra work at the northwest corner of Moorpark Avenue and High Street. The contractor's change order quotation was not reduced. Attached is a copy of the contractor's cost estimate for this work. A substantial portion is the mobilization of the crews back to the job site. Since the original project is nearly complete, there are minimal advantages for the City to use the same contractor for the improvements at High Street and Moorpark Avenue. The City Council may wish to utilize the recently adopted informal bidding procedures to obtain competitive proposals from other-contractors. — RECEIVED — City of Moorpark 799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864 Page -2- • • OD • The following options are offered: 1. Authorize Sully - Miller to construct the improve- ments as described in the attached proposal. (According to original City Council action, the financing would be $8,388 City and $8,388 Velasquez) . 2. Solicit additional bids from contractors under the new informal bidding procedures recently adopted by the City Council. It is estimated that the bids will range between $26,000 to $30,000. 3. Require the developer of PD -1048 (Valesquez) to construct the improvements along Moorpark Avenue. RDD :JDG :lb2 Encl. JN 3750 LILLY- MILLER MAIN OFFICE 3000 E. SOUTH STREET / LONG BEACH, CALIFORNIA 90805 / (213) 531 -3550 (213) 774 -0714 BRANCH OFFICES +- - 6145 SANTIAGO CANYON ROAD / ORANGE, CALIFORNIA 92667 / (714) 639 -1400 5625 SOUTHERN AVENUE / SOUTH GATE, CALIFORNIA 90280 / (213) 634 -6698 (213) "15° 1 ell �0" �NTq.e..CT7N0 co. 3555 VINEYARD AVENUE / OXNARD, CALIFORNIA 93030 / (805) 485 -7923 --J 1 weuduryo1 Koppers Company Inc. 555 AIRPORT ROAD / OCEANSIDE, CALIFORNIA 92054 / (714) 757 -3910 . T0: City of Moorpark Date March 27, 19_86 199 Moorpark Avenue, Moorpark, CA 93021, Attn: James D.-, referred to herein as Buyer. Grisham, Sr. Project Engineer Sully- Miller Contracting Company, referred to herein as Seller, proposes to furnish Buyer only the labor and material listed below upon the terms set forth herein for the construction of Moorpark Avenue Pedestrian Safety Project Located at: Moorpark Ave — LA Ave to Charles St, Moorpark, CA Breakdown as Follows: EXTRA WORK AT NORTHWEST CORNER OF MOORPARK AVE AND HIGH STREET. 4" PCC Sidewalk r ITEM DESCRIPTION QTY UNIT PRICE t TOTAL 1. Aggregate Sub Base Material 9 CY 54.40 489.60 2. Aggregate Base Material 16 CY 48.77 780.32 I 3. Asphalt Concrete Pavement 21.5 TN 83.50 11795.25 4. A2 -6 PCC Curb and Gutter 84 LF 8.70 730.80 5. 4 inch thick PCC Sidewalk with Handicap Ramp 1000 SF 1.50 1,500.00 6. 4 inch thick Sand Bedding with Sterilant 12 CY 42.00 504.00 7. 0 L Drainage inlet structure W =141, with local depression for State STD. D72 and D76 1 EA 4,200.00 4,200.00 8. 18" RCP (D -1350) 53 LF 70.00 31710.00 8A. 24" RCP in lieu of 18" RCP 53 LF 73.00 32869.00 9. Type 3 Junction Structure and Plug existing inlet to RCB 1 EA 1,825.00 17825.00 10. Clearing & Removal - includes Breakdown as Follows: Curb & Gutter 8 CY 4" PCC Sidewalk 12 CY AC Removal 12 CY Earth Excavation 48 CT 80 CY = 16 Hrs. @ 287.50 per hr. 4,600.00 %,%:.TIivU%D ON PAGE TwO: NOTE: Seller will not be responsible for darnage to underground pipeline9, wiring, etc. When asphalt surface mix above is three inches or less in thickness, Seller assumes no responsibility for damage to the surfacing because of Bermuda grass or other vegetable growth, whether or not v-: eed killer has been applied. Asphalt Paving is a plyable material and will mark when heavy loads are placed on small bearing surfaces. Solvents will loosen asphalt. All for the sum of $ SEE ABOVE >i�ax�c t This must be accepted in writing hereon within 15 days from above date. Terms: Net cash. LABOR AND MATERIAL JOBS payable by the 10th of each month for all that portion of each class of work hereunder completed the previous month. IMATERIAL ONLY payal le by the 10th of each month following date of delivery. When signed by the Buyer and Seller's sales representative and approved by a sales mansginq officer of Seller this will constitute a firm contract between both parties hereto, for all labor and for materials herein referred to, ACCORDING TO TERMS AND CONDITIONS ON BOTH SIDES HEREOF. ACCEPTED: SULLY - MILLER CONTRACTING COMPANY Please sign and return original copy only. D i K PRINTING CO. X -140 Buyer APPROVED: By Gerald T. Berry Seller. BULLY -,MILL I` F7 MAIN OFFICE 3000 E. SOUTH STREET / LONG BEACH, CALIFORNIA 90805 / (213) 531 -3550 (213) 774 -0714 BRANCH OFFICES 6145 SANTIAGO CANYON ROAD / ORANGE, CALIFORNIA 92667 / (714) 639 -1400 5625 SOUTHERN AVENUE / SOUTH GATE. CALIFORNIA 90280 / (213) 634 -6698 (213) 773 -5155 COrV7R/►GT1N0 CO. 3555 VINEYARD AVENUE / OXNARD. CALIFORNIA 93030 / (805) 485.7923 ASvb+diary olKopper%CompanyInc 555 AIRPORT ROAD / OCEANSIDE. CALIFORNIA 92054 / (714) 757 -3910 TO: City of Moorpark Date March 27, � 19_86 799 Moorpark Avenue, Moorpark, CA 93021, Attn: James D. referred to herein as Buyer. Grisham, Sr. Project Engineer Sully - Miller Contracting Company, referred to herein as Seller, proposes to furnish Buyer only the labor and material listed below upon the terms set forth herein for the construction of Mooraprk Avenue Pedestrian Safety Project Located at: Moorpark Ave — LA Ave to Charles St, Moorpark, CA PAGE TWO OF TWO: ITEM DESCRIPTION QTY Dump Fees Saw Cut Remove existing 24" CMP, Drop Inlet and backfill vacant trench with concrete slurry Traffic Control = 10 working days 4 weekend days Signs & Delineators plus Special Signs Two additional moves for PCC items 4 and 5 Cal Trans Encroachment Permit Restripe X —ways & centerline, Stop Bar, Etc (Damaged Only) Dust Control Mobilization: Equipment moves Rent Storage Area UNIT PRICE TOTAL 550.00 160.00 2,550.00 1,265.00 345.00 230.00 800.00 575.00 460.00 400.00 620.00 ann.nn Item #10 Total 12,955.00 Revised 3 -27 -86 Total Price for Extra Work 32,358.97 (Items 1 thru 10) If Alternate 8A is constructed Add 169.00 An Additional 10 working Days are required to complete above itemized Extra Work. NOTE: Seller will not be responsible for darnage to underground pipelines, wiring, etc. When asphalt surface mix above is three inches or less in thickness, Seller assumes no responsibility for damage to the surfacing because of Bermuda grass or other vegetable gro�-th, whether or not weed killer has been applied. Asphalt Paving is a plyable material and will .mark when heavy loads are placed on small bearing surfaces. Solvents will loosen asphalt. SEE ABOVE A7eVrX>§q=X4xfWt All for the sum of $ JA"1sx x This must be accepted in writing hereon within 15 _.da,} _ -from -above date. - - -- -- . - Terms: Net cash. LABOR AND MATERIAL JOBS payable by the 10th of each month for all that portion of each class of work hereunder completed the previous month. MATERIAL ONLY payable by the 10th of each month following date of delivery. When signed by the Buyyer and Seller's sales representative and approved by a sales manaTnq officer of Seller this will constitute a firm contract between both parties hereto, fw all labor and for materials herein referred to. ACCORDING TO TERMS AND CONDITIONS ON 60TH SIDES HEREOF. ACCEPTED: SULLY-MILLER CONTRACTING COMPANY Please sign and return original copy only. D i K PRINTING CO. 40 Buyer APPROVED: By Gerald T. Berry Seller'