Moorpark Avenue Pedestrian Safety Project
Additional Improvements
Y / �
ITEM 11D
STEVEN KUENY
City Manager
CHERYL J. KANE
City Attorney
RICHARD MORTON
Director of
Community
Development
R. DENNIS DELZEIT
City Engineer
JOHN V. GILLESPIE
Chief of Police
Per your request, we have estimated the engineering and
construction costs for improvements along the east side of
Moorpark Avenue between First and Third Streets. A summary
of these costs is attached to this memo. The total
estimated cost to construct these improvements is $ 103,000.
This estimate assumes that all existing improvements between
Third Street and the railroad right -of -way will be removed
and reconstructed.
The portion of Moorpark Avenue between First Street and
Railroad right -of -way was included as a separate item in the
estimate. These improvements are also recommmended in order
to maintain the existing alignment of Moorpark Avenue.
Based upon our recent experience with CalTrans, many of the
existing driveways will be reduced in width. It does not
appear that access to any one parcel will be restricted. It
does appear, though, that the parking on three of the
parcels will be reduced as a result of these improvements.
All parcels will retain their alley access.
-- RECEIVED --
City of Moorpark
799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864
Page -2-
It will require approximately forty to sixty calendar days
to construct the improvements between Third Street and the
railroad right -of -way.
Should you have any questions, please do not hesitate to
contact me.
RDD : JDG: sm2
Encl.
cc: John F. Knipe, Asst. City Engineer
JIB 3750/3555
MOORPARK AVENUE PEDESTRIAN
ACCESS IMPROVEMENTS
Between Third Street And Railroad Right -Of -Jay
I. Construction Costs
A.
Third Street To Second Street
Construction Cost
$
31,000
Contingency (15 %)
$
4,650
Subtotal:
$
35,650
$
35,650
B.
Second Street To First Street
Construction Cost
$
30,000
Contingency (15 %)
$
4,500
Subtotal:
$
34,500
$
34,500
C.
First Street To Railroad R/W
Construction Costs
$
71000
Contingency (15 %)
$
1,050
Subtotal:
$
8,050
$
81050
II. Engineering
A.
Survey
$
11000
B.
Design
$
10,000
C.
Obtain CalTran Permit
$
11000
III. Construction Administration
And
Observations
A.
Administration
$
71500
B.
Construction Observation
$
3,500
C.
Survey
$
800
D.
Soils Testing
$
11000
Total Project Cost
$103,000
JDG: 4/2/86
h'IIIK
LLI ❑ �
_
5/3.
Lu
�C0
506.2 ( 9 OX
FIF
❑ w ❑ - x - _ `�
� ❑ Q ❑ ❑
X ❑ > [
Q az �
❑ _x u ❑ AREA
X El _x ❑ ❑ _❑ C
❑ z
— — SOX OX .9 ❑ l
z ❑� u' Y SEC
�f -z
YI I I I
! 286,0 '2c
❑❑V
w ❑ I
a Lo W d Q ,4REq
i _❑ Q ❑ U
o ❑ O
u I � o _ I
5 Irl c
0 1.0 503.❑ L_1
) X
X X5 p E
L _ _ � � HIRE
0 El
• a
E° rchord I
(❑ fl Q O
O
El 0
.. ❑ ❑ i❑ cl o
a�
J ❑ ❑
STREET
� I
o l u
o�
❑ EDa o
❑ ❑l'
I❑ ❑
El ❑ ❑U
3O STR(EET 5/5.0X
X5/2.
MOORPARK AVENUE
PEDESTRIAN ACCESS IMPROVEMENTS
BETWEEN THIRD STREET AND RAILROAD RIGHT -OF-
WAY
NOT TO SCALE
c