HomeMy WebLinkAboutAGENDA REPORT 1987 0325 CC ADJ ITEM 11NTHOMAS C. FERGUSON Mayor CLINT HARPER, Ph.D. Mayor Pro Tern ELOISE BROWN Councilmember JOHN GALLOWAY Councilmember BERNARDO PEREZ Councilmember MAUREEN W. WALL City Clerk MOORPARK MEMORANDUM TO : The Honorable City Council F R O M : Steven Kueny, City Manager DA-1F E : March 24, 1987 /i ,/, ic' 7 ITEM STEVEN KUENY City Manager CHERYL J. KANE City Attorney PATRICK RICHARDS, A.I.C.P. Director of Community Development R. DENNIS DELZEIT City Engineer JOHN V. GILLESPIE Chief of Police THOMAS P. GENOVESE City Treasurer S U B J E C T : GRIMES CANYON ROAD - PAVEMENT RECONSTRUCTION AND SHOULDER REPAIR At the adjourned meeting of March 11, 1987, the City Council approved several modifications to the contract with Slurry Seal of California. The modifications consisted of several items of additional work. Repair work to Grimes Canyon Road was an item on which a bid amount was obtained, but subsequently, not recommended for inclusion in the amended scope of work. The reason for that recommendation was that the bid exceeded the Engineer's estimate. Since the March 11, 1987 meeting, City staff has worked with Slurry Seal of California to reduce their bid for this work. The original bid of $54,667 has been reduced to $53,085 for the least costly of the three (3) repair options. The revised amount includes $2,200 for the additional surety bond for this work. Applicable laws do not allow us to waive the bond requirement for this work. (Note - The original revised bid was $50,885). In addition, the Engineer's costs for contract administrator and inspection would total $4,294 for the Grimes Canyon Road repair. The City Engineer had estimated the cost of the work as $45,000 without the need for additional surety bonds. As indicated in a previous report by the City Engineer, the condition of the pavement is quickly deteriorating. I recommend we add this work to the contract with Slurry Seal of California. This will require an additional appropriation. As previously reported, there is about $700,000 in available road funds. A copy of the contractor's bid work sheet and engineer's costs are attached. A summary of the proposed work is as follows: 1. Contract Work $53,085 2. Contingency - 2% 1,061 3. Professional Services 4,294 TOTAL $58,440 799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864 The Honorable City Council Page 2 March 24, 1987 RECOMMENDED ACTION: 1. Approve the addition of the Grimes Canyon repair work to the contract with Slurry Seal of California in an amount not to exceed $53,085 and a construction contingency not to exceed $1,061. 2. Approve additional administration and observation services by the City Engineer not to exceed $4,294. 3. Authorize an appropriation in an amount not to exceed $58,440 from the Gas Tax Fund for the referenced item of work. MOORPARK, CALIFORNIA City Council Meeting of `S S -_ 198E SK: i gb ACTIO,�� 8Y C econstruct Pavement on Grimes Canyon Road. The structural section o 'shat I cons I st of 311 of AC on 611 of PMB. The exist i ng pavement shall be saw cut and the subgrade scarif led . and compacted to 95 AL /percent relative compaction to a depth of 6rr. Shoulder back fIII k 0 shall consist of placing fill material on the roadway shoulder, 3 L grading it to draln away from the pavement and wheel rolling It. p Q > ALTERNATE "A" �± v�j t � � r b UNIT ITEM REF. QUANT. PRICE 2.25 TOTAL 1. Pavement Reconstruction 302 -5.8 15,000 SF �L -3r I ,-- 3S 700,01 2. Traffic Control 3. Shoulder BackfiII 4. Centerline Stripe Type 12 5. Centerline Stripe Type 14 6. Shoulder Stripe Type 4 507 -3 LS 3C0 3,000 310 - 5.5.10 3,200 310 - 5.5.10 2,100 310 - 5.6.10 10,600 a LS LS r� v 7 J-6 GJ S+ 0 0 $J 1-.0 0 3 Fj Y CS( of 2_2, -,332. C, IBS 00 TOTAL ITEM V (Alternate "A") / �$'`�' �oG %i ° OS�Q, F$� ('0n/%2AC7­0�i�1 plat I c f- . .TERNATE "9" QUANT. ,'142 UNIT PRICE TOTAL b2 -5.8 28,000 SF Z, 2•Y G3 f 07 -3 LS LS -5- EXHIBIT A GRIMES CANYON ROAD CHANGE ORDER NO. 2 SLURRY SEAL 1986 -87 Administration (86 -36) Finalize change order, prepare Council memo, meet with contractor, review detour plan, visit project site during construction, administration, include in payments, meet with inspector, final walk through. Administration (86 -36) _ $ 1,662 Observation (86 -37) Mark repair areas, review with contractor, observe construction, meet with engineer, final walk through. Observation (86 -37) _ $ 2,632 BJR: is JN 3944 CMO202.MIS