Loading...
HomeMy WebLinkAboutAGENDA REPORT 1987 0304 CC REG ITEM 11O1 MOORPARK ITEM THOMAS C. FERGUSON STEVEN KUENY Mayor City Manager CLINT HARPER, Ph.D. CHERYL J. KANE Mayor Pro Tern oo ♦� °�s, City Attorney ELOISE BROWN PATRICK RICHARDS, A.I.C.P. Councilmember Director of JOHN GALLOWAY o Community Development Councilmember� „� R. DENNIS DELZEIT BERNARDO PEREZ " City Engineer Councilmember • J JOHN V. GILLESPIE MAUREEN W. WALL Chief of Police City Clerk THOMAS P. GENOVESE City Treasurer TO: FROM= DATE= SUBJECT: M E M O R A N D U M The Honorable City Council Steven Kueny, City Manager .)' 'n March 4, 1987 Proposed Change Order to the Contract for Slurry Seal of Certain City Streets The 1986 -87 adopted budget included $154,000 for slurry sea] related projects. $142,000 was budgeted for the actual project work, and $12,000 for related professional services. This item had been included as an approved project in the adopted Capital Improvement Program (CIP) for the 1985/86 and 1986/87 fiscal years. $77,000 had been identified for each of those years in the CIP. On November 17, 1986, the City Council authorized award of a bid in the amount of $99,999.88 for this project to Slurry Seal of California. Staff was also directed to prepare proposed change orders for additional street work up to the budgeted amount. The projects on which change order bids were solicited are summarized in the two attached reports from the City Engineer dated February 18, 1987. In addition to the slurry seal and related repair and restriping work for Peach Hill Road, and repair, restriping and placement of reflectorized markers on Tierra Rejada Road, the change order included repair work for Grimes Canyon Road and the overside drain damage on Moorpark Road, restriping at the intersection of Tierra Rejada and Moorpark Roads to allow for a right turn only lane, and modification to the slurry seal type on two streets (Robin - wood and Poindexter Avenue). The work at Campus Park, though recommended by the City Engineer on a cost basis, is not recommended at this time since it was not a budgeted item and has not been reviewed by the Parks and Recreation Commission. This item should be considered during 1987/88 budget deliberations. Grimes Canyon Road and Moorpark Road are proposed to be pursued as separate projects. The following is a summary of the current and proposed costs and recommendations for the change order work: 799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864 The Honorable City Council March 4, 1987 Page Two PROJECT 1. Original Contract $ 99,999.88 2. Type I to Type II Slurry 536.75 3. Tierra Rejada Road - Repair, restripe, & raised markers 12,130.00 4. Peach Hill Road Slurry Seal 17,964.00 5. Right Turn Lane - Tierra Rejada at Moorpark Road (estimate) 2,500.00 Total Recommended Contract plus Change Orders $133,130.63 6. Contingency 10,000.00 TOTAL $143,130.63 PROFESSIONAL SERVICES 1. a. Design Services for Original Work b. Design of Right Turn Lane per #5 Above Total Design 2. a. Original Contract Administration b. Change Order Preparation C. Contract Administration for Addition of Right Turn Lane Total Contract Administration 3. a. Construction Observation b. Construction Observation for Tierra Rejada & Peach Hill Road Portion of Change Orders C. Construction Observation for Right Turn Lane at Tierra Rejada /Moorpark Road Intersection Total Construction Observation TOTAL PROFESSIONAL SERVICES AS RECOMMENDED $ 7,299.00 708.00 $ 8,007.00 $ 3,397.00 2,317.00 613.00 $ 6,327.00 $ 4,444.00 1,128.00 220.00 $ 5,792.00 $ 20,126.00 If the four (4) recommended change order items are included in the contract plus the accompanying professional services, the total estimated expenditure would be $153,256.63. There is still a need for a $10,000 contingency to accommodate any additional pavement repair prior to the slurry treatment as determined by actual field conditions and adjustments to actual quantities of slurry seal applied or other unanticipated events. The Honorable City Council March 4, 1987 Page Three The contingency can be provided by 1) authorizing an additional appropriation from the street funds (either Gas Tax or T.D.A. Article 8 funds, or 2) eliminating a portion of the proposed change order work so as not to exceed a total project cost of $154,000. There is a projected combined fund balance of $700,000 at June 30, 1987 in the two street funds. It is recommended that the contingency be provided by an additional appropriation in the amount of $10,000 from the Gas Tax Fund. This will allow us to utilize the existing contractor and provide the needed work at current costs instead of deferring the work until next year's project with anticipated higher costs. The work on Tierra Rejada Road will restore the unpaved shoulders, repair damaged pavement and provide reflectorized pavement markings which should make this unlighted road safer for the public. As you are aware, the traffic volumes have increased significantly on the road and based upon current development projections and the Moorpark /Tierra Rejada Road Area of Contribution Fund balance, this road is not likely to be widened in the near future. The proposed right turn lane at the intersection of Tierra Rejada Road and Moorpark Road will improve traffic at peak times, and generally make it more convenient to the public. The proposed work on Peach Hill Road will improve the pavement condition on this important collector. The slurry seal and placement of reflectorized markers will coincide with the same work to be provided by Cal Prop on Peach Hill Road between Rolling Knoll Road and Moorpark Road. RECOMMENDED ACTION: 1. Approve Change Order No. 1 to the contract with Slurry Seal of California for: a. Type I to Type II Slurry $ 536.75 b. Tierra Rejada Road 12,130.00 C. Peach Hill Road 171964.00 Total $30,630.75 2. Authorize Change Order for right turn only lane for westbound Tierra Rejada Road at Moorpark Road in the estimated amount of $2,500. 3. Approve changes to Nrotessional Services for items of work as previously specified in the amount of $4,986. 4. Authorize appropriation from the Gas Tax Fund in the amount of $10,000 for this project with the total improvement cost not to exceed $143,131, and professional services not to exceed $20,126 without City Council approval. MOORPARK THOMAS C. FERGUSON STEVEN KUENY Mayor City Manager DANNY A. WOOLARD .µ CHERYL J. KANE Mayor Pro Tem ' • City Attorney ELOISE BROWN PATRICK RICHARDS, A.I.C.P. . Councilmember Director of JOHN GALLOWAY o Community Development Councilmember R. DENNIS DELZEIT CUNT HARPER, PhD. ••* J City Engineer Councilmember ' JOHN V. GILLESPIE MAUREEN W. WALL Chief of Police City Clerk MEMORANDUM THOMAS P. GENOVESE City Treasurer TO: Steve Kueny, City Manager FROM: John F. Knipe, Assistant City Engineer DATE: February 18, 1987 SUBJECT: Slurry Seal 1986 -1987 Summary of Change Order No. 1 The following table summarizes the items of Change Order No. 1. After you have decided which items you would like to include, let me know and I will finalize the change order with the contractor. Contractor Engineer's Award Item Description Price Estimate Recommend. I Type I to Type $ 536.75 $ 500.00 Yes II Slurry II Tierra Rejada $ 12,130.00 $ 9,000.00 Yes Road III Peach Hill Road $ 17,964.00 $16,000.00 Yes IV Overside Drain $ 17,985.00 $ 9,000.00 No V -A Grimes Canyon $ 54,667.00 $45,000.00 No Road - Repair 15,000 sq. ft. V -B Grimes Canyon $ 87,092.00 $72,000.00 No Road - Repair 28,000 sq. ft. V -C Grimes Canyon $105,512.00 $88,000.00 No Road - Repair 37,000 sq . ft. f••• RfiV,k6­1:ED ... FEB 2 0 1987 799 Moorpark Avenue Moorpark, California 93021 OF M04RPARj( (805) 529 -6864 Page -2- Item Description V -D Grimes Canyon Road - Open graded overlay VI Campus Park Contractor Price $100,692.00 Engineer's Award Estimate Recommend. $85,000.00 No $ 7,800.00 $ 6,000.00 Yes DISCUSSION OF AWARD RECOMMENDATIONS Item 1 The prices received for changing from Type I slurry to Type II slurry on Robinwood Lane and Poindexter Avenue were about as expected. Therefore, award is recommended. The contractor's price for improvements on Tierra Rejada Road were slightly more than anticipated. However, they are not all that unreasonable. Item 3 The contractor's price for improvements on Peach Hill Road are close to the Engineer's Estimate, therefore, award is recommended. The contractor's price for the repairs to the Moorpark Road overside drain are much higher than can be justified. Therefore, I recommend that this work not be awarded to the contractor. The City should perhaps consider putting this work out for competitive bid. Page -3 - Item 5 The contractor's prices for all of the alternates for repair on Grimes Canyon Road are much higher than the Engineer's Estimate. Therefore, I recommend that the minor repair work be put out to a competitive bid in an attempt to get more reasonable prices. However, due to the quickly deteriorating- condition of the pavement, the City may wish to consider other ways to do some emergency repair work on the roadway. Item 6 The contractor's price for the Campus Park walkway is fairly close the Engineer's Estimate. These types of small projects are very difficult to estimate, therefore, the contractor's price is probably reasonable. FUNDING SUMMARY Item Description Cost Original Contract $ 99,999.88 I Type I to Type II Slurry $ 536.75 II Tierra Rejada Road $ 12,130.00 III Peach Hill Road $ 17,964.00 TOTAL VI Campus Park (Other Funding Source) JFK :BJR :jg3 Encl. cc: R. Dennis Delzeit, City Engineer Bert Rapp, Project Engineer JN 3944 MO193B.MEM $130,630.63 $ 7,800.00 THOMAS C. FERGUSON Mayor DANNY A. WOOLARD Mayor Pro Tem ELOISE BROWN Councilmember JOHN GALLOWAY Councilmember CLINT HARPER, PhD. Councilmember MAUREEN W. WALL City Clerk M OORPARK MEMORANDUM TO: Steve Kueny, City Manager FROM: John F. Knipe, Assistant City EngineE DATE: February 18, 1987 STEVEN KUENY City Manager CHERYL J. KANE City Attorney - PATRICK RICHARDS, A.I.C.P. ' Director of Community Development R. DENNIS DELZE(T City Engineer JOHN V. GILLESPIE Chief of Police THOMAS P. GENOVESE City Treasurer SUBJECT: Slurry Seal Change Order Right Turn Lane on Tierra Rejada Road at Moorpark Road From the preliminary investigations of the intersection of Tierra Rejada Road at Moorpark Road it has been determined that a right turn.lane can work at that intersection, but it will be a tight fit. In order to redesign the striping to accommodate the right turn lane it will be necessary to make field measurements of the existing pavement and striping, then the striping and signing plans can be prepared. This project will require the restriping of Tierra Rejada Road for 200' each side of Moorpark Road. I am proposing to include this work in the Slurry Seal project which will save money in both the construction. and construction administration costs. Please see Exhibit "A" for a detailed breakdown of the work involved and the costs. JFK : BR: sm Encl. cc: Jerry Forde, Administrative Assistant Bert Rapp, Project Engineer JN 3944 cmo163 799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864 EXHIBIT "A" Proposal for Professional Services Right Turn Lane Tierra Rejada Road at Moorpark Road DESIGN AND CONSTRUCTION ADMINISTRATION: 1. Survey the existing intersection; approach widths, existing striping and signing. Total $ 372.00 2. Design the right turn lane, intersection striping and signing, prepare drawings and details. Total $ 336.00 3. Prepare a contract change order to the Slurry Seal project, negotiate with the Contractor, include in contract quantities, pay items and Council memos. Total Total Design and Construction Administration SUMMARY: Design and Construction Administration Construction Observation Estimated Construction Total Project Cost JFK :BJR :sm2 cm0163 $ 613.00 $1,321.00 $1,321.00 $ 220.00 $2,500.00 $4,041.00