HomeMy WebLinkAboutAGENDA REPORT 1988 0323 CC ADJ ITEM 11BJOHN GALLOWAY
Mayor
ELOISE BROWN
Mayor Pro Tern
CLINT HARPER, Ph.D.
Councilmember
JOHN PATRICK LANE
Councilmember
MAUREEN W. WALL
City Clerk
THOMAS R GENOVESE
City Treasurer
MOORPARK. ITEM
STEVEN KUENY
City Manager
CHERYL J. KANE
City Attorney
PATRICK RICHARDS, A.I.C.P.
MOORPARK, CALIFORNIA Director of
Community Development
City Council Meeting R. DENNIS DELZEIT
of S —A 1982 City Engineer
JOHN V. GILLESPIE
�CLO "0.' h-t . Chief of Police
ACTION OA-1 �e �.�,a -,. A,, .... ,
-Z�5
M E M O R A N D U M
A4 1.
TO: The Honorable City Council
FROM: Patrick J. Richards, Director of Community Development
DATE: March 10, 1988 (CC meeting of 3/16/88)
SUBJECT: DRAFT DOWNTOWN PLAN - THE PLANNING CENTER CONTRACT
Background
On May 6, 1987 the City Council reviewed four (4) proposals to
create a Downtown Plan for the City of Moorpark. The consultant
selected was The Planning Center for a contract amount of
$33,150. Also, at the May 6th meeting the Council authorized the
Mayor to sign a contract with The Planning Center on behalf of the
City. A contract was negotiated by staff and signed by all parties
on August 17, 1987. The Planning Center started their work on
the plan at the end of June 1987.
niccuccinn
Upon a recent review of the contract between the City and The
Planning Center, the fact was disclosed that they have used almost
all of their designated meetings. To date the Draft Downtown Plan
is still being reviewed by the Planning Commission (their last
meeting was February 29, 1988) .
It is anticipated that more than one meeting may be needed to reach
a resolution on the matter. In need for the extra meetings a
request was made of the contractor to identify the costs per
meeting (see attached 2/25/88 letter) . The Planning Center has
estimated costs between $1,250 to $1,500 per meeting.
PJR:crl
799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864
DWNSTDYP /PCAGENDA
March 10, 1988
Page 2
It is staff's opinion that one (1) more meeting before the Planning
Commission and two (2) meetings before the City Council will be
needed. According to the contract, the City has one more meeting
towards it's credit.
Staff would recommend that the Council authorize an additional
$3,000 to be allocated towards the existing contract to pay for
meeting costs.
Another matter regarding the need to amend the contract scope of
work is the latest Planning Commission requests at their February
29th meeting. Staff has requested from the contractor an estimate
on the costs to perform the additional work, but as of this writing
no reply has been received, but The Planning Center has indicated
that they will have their revised costs estimates prior to the
Council's March 16th meeting.
A review of the Community Development Block Grant files was
accomplished by staff in as much as the plan is being paid for by
CDBG funds. The City originally identified to the State a cost of
$30,000 to complete the plan. Since the original proposal there
has been an intention by the City to raise this amount to $45,000.
The City has yet to formally request an amendment to the State for
an increase. Discussions with the State indicate that such an
amendment would be favorably received. The City may end up
paying out of general funds until the State can make it's
adjustment. At this time the City Council may authorize the
additional funds so as to complete the requested Planning
Commission studies, or they may call the matter forward with the
Planning Commission's recommendations on the draft plan as is.
Conclusion
The contract with the Planning Center will soon exhaust it's
remaining meeting times. The additional requested studies by the
Planning Commission will cause an increase in the original contract
costs.
Recommendation
1. Direct staff to amend the CDBG Entitlement Program to
reflect $45,000 in the Professional Services line item.
2. Amend the contract with the Planning Center to add two (2)
additional meetings to attend with a cost to be time and
materials not to exceed $2,500
3. Direct the Planning Commission to forward their
recommendations on the draft plan to the Council upon the
conclusion of their March 21, 1988 meeting.
Attachments: Contract
Scope of Work
The Planning Center letter dated 2/25/88
PJR:crl
DWNSTDYP /PCAGENDA
THE
�J
CENTER
1300 DOVE STREET, SUITE 100, NEWPORT BEACH, CALIFORNIA 92660 (714) 851 -9444
February 25, 1988
Mr. Patrick J. Richards
Director of Community Development
City of Moorpark
799 Moorpark Avenue
Moorpark, California 93021
Re: Moorpark Downtown Study (MPK -01) - Additional Meetings
Dear Pat:
In response to your request this morning, this letter con-
firms that we have attended the number of meetings outlined
in our contract. It is clear that additional meetings -- at
least two City Council meetings -- will be required to fin-
ish the contract. Our contract makes provision for this,
stating that "additional meetings may be added to the budget
on a time and materials basis."
For budgeting purposes, we estimate that each meeting will
require attendance by two representatives from The Planning
Center, and that each meeting will require approximately 8
to 10 hours (including preparation and travel time). The
hourly rate schedule in our contract can be used to estimate
costs:
Senior Project Manager
$90
Project Manager
$70
Senior Planner
$60
Market Analyst
$60
We therefore estimate that each additional meeting should
average $1,250 to $1,500. We suggest you use the latter
figure as a budget maximum per meeting and will bill you on
a time and materials basis. We will attend additional meet-
ings based on your prior approval. Should you have any
questions, please do not hesitate to call.
Sincerely,
PLANNING CENTER
Michael H. Nihan
Project Manager
MHN /lls
99.40
- RECEwLi -
FEB ? 919,U
OFFICES IN NEWPORT BEACH, CA, PHOENIX, AZ and TUCSON, AZ CITY OF MOORPARK
• PLANNING & RESEARCH • ENVIRONMENTAL STUDIES • URBAN DESIGN • LANDSCAPE ARCHITECTURE •
Notices
Section 7.04. Any notice to be given hereunder by either
party to the other shall be effected either by personal delivery in
writing, or by certified mail, postage prepaid, return receipt
requested. Mailed notices shall be addressed to the City in care
of the City Manager, 799 Moorpark Avenue, Moorpark, California
93021 and to Contractor at 2140 Eastman Avenue, Ventura, California
93003; however, each party may change the address by written
notice in accordance with this section. Notices delivered
personally will be deemed served as of actual receipt; mailed notices
will be deemed served as of the second (2nd) day after mailing.
Entire Agreement of the Parties
Section 7.05. This agreement supersedes any and all
agreements, either oral or written, between the parties hereto with
respect to the rendering of services by Contractor to City and
contains all of the covenants and agreements between the parties with
respect to the rendering of such services in any manner whatsoever.
Each party to this agreement acknowledges that no representations,
inducements, promises, or agreements, oral or otherwise, have been
made by any party or anyone acting on behalf of any party, which are
not embodied herein, and that no other agreement, statement, or
promise not contained in this agreement shall be valid or binding.
Any modification of this agreement will be effective only if it is
in writing signed by the party to be charged.
Governing Law
Section 7.06. This agreement shall be governed by and
construed in accordance with the laws of the State of California.
Attorney's Fees
Section 7.07. Should either party hereto institute any
action or proceeding of any nature whatsoever in a court of law,
equity, or otherwise to enforce any provision of this agreement
or for a declaration of such party's rights or obligations
hereunder or for any other remedy, the prevailing party shall be
entitled to receive from-the losing party its'costs, including such
amount as the Court or arbitration panel may adjudge to be reasonable
attorney's fees for the services rendered the party finally
prevailing in any such action or proceeding. Unless judgment goes
by default, the attorney fee award shall not be computed in
accordance with any court schedule, but shall be such as to fully
reimburse the prevailing party for all its /their attorney's fees
actually incurred in good faith, regardless of the amount of such
judgment, it being the intention of the parties to fully compensate
the prevailing party for all attorney's fees paid or incurred in
good faith.
Venue
Section 7.08. This agreement is made, entered
into, executed and is to be performed in Moorpark, Ventura
County, California, and any action filed in any court or for
arbitration for the interpretation, enforcement and /or oth-
erwise of the terms, covenants and conditions referred to
herein shall be filed in the applicable court in Ventura
County, California.
City's Agent
Section 7.09. The Moorpark Director of Community
Development shall have the right to review, coordinate and
approve all work to be performed by Contractor pursuant to
the terms of this agreement and shall be the City's agent
with respect to review, coordination, and approval of the
services to be performed by the Contractor.
EXECUTED in duplicate at Moorpark, California, on
the date and year first herainabove written.
THE PLANNING CENTER
By
Ti
And by
Title
C O N T R A C T O R
(Notarial Certificates Attached)
CITY OF MOORPARK, CALIFORNIA
a municipal corporation
By Hall�
Mayor of the City of
Moorpark, California
ATTEST:
15A.10
CERTIFICATE OF ACKNOWLEDGEMENT
(Corporation)
STATE OF CALIFORNIA
COUNTY OF ORANGE
On this _ /0 day of ,4 iX- 0—S _14� , 1987, before
me, the undersigned, a Notary Public in and for said State,
personally appeared
evidence to be the Principal, The Planning Center of The
Planning Center_, and whose name is subscribed to the within
instrument, and acknowledged to me that the corporation exe-
cuted it.
(SEAL)
WITNESS MY HAND AND OFFICIAL SEAL.
O' GL SEAL
MARY LYNN HARMON
NOTARY PUBUC - CALIFORNIA
ORANGECOUNTY
MY Comm E■piml jo 7 1991
jaNry blic in and for
County and State
i
A. SCOPE OF WORK
The following Scope of Work states the tasks, products and
budget allocations for the Moorpark Downtown Study. The at-
tached schedule diagram illustrates the time relationships
of the tasks, predicted on a six month project schedule be-
ginning June 1, 1987. This Scope of Work statement is the
result of City /consultant negotiations. A time schedule is
attached for reference purposes.
TASK 1: LAND USE ANALYSIS
Determine study area boundary adjustments. Assemble, map
and analyze existing land use information. Determine and
compare general plan, zoning, existing land use and property
ownership patterns. Identify land use conflicts and oppor-
tunities for: new development, preservation of existing
uses, expansion of existing uses, rehabilitation or improve-
ment of existing uses, or redevelopment. Describe in
summary map and narrative form to eventually become existing
conditions section of the final report.
Products: 1. Existing use, zoning, general plan comparison
summary.
2. Opportunities and constraints map.
3. Potential parcel consolidation map.
Time: 4 weeks
Budget: $3,200 -
TASK 2: RAILROAD USE
Meet with railroad officials. Determine uses already com-
mitted and opportunities for modification, if. any. Deter-
-7
mine potential uses for excess railroad Iafid
committed and describe any special site requirements they
may have.
Products: 1. Summary of existing uses and their status.
2. List of potential uses and site requirements.
Time: 2 weeks
Budget: $2,000
TASK 3: GUIDANCE PACKAGE
Meet with key City officials and business community repre-
sentatives. Draft guidance package, identifying problems
and potentials for the planning area and principles for
successful project completion. Review draft with staff,
Planning Commission and City Council.
1
Products: 1. Draft guidance package.
2. Final guidance package.
Time: 4 weeks
Budget: $2,000
TASK 4: MARKET POTENTIAL
Based on land use data from Task 1 and secondary market data
for-Ventura County, identify the most probable land use
potentials which could respond to market opportunities.
Products: 1. List of optimum uses.
2. Back -up data.
Time: 1 week
Budget: $1,000
TASK 5: POTENTIAL INCENTIVE MEASURES
Prepare a description of candidate incentive measures that
could be considered in order to stimulate desired improve-
ments in the study area. This will include ways to stimu-
late more- efficient use of available land. The incentives
should be reviewed by the City while land use recommenda-
tions to arrive at an acceptable "short list" to include in
the final report.
Time: 1 week
Budget: $1,200 -
TASK 6: DRAFT LAND USE PLAN
Based on all information to date, formulate a draft land use
plan which takes maximum advantage of physical and market
potentials identified to date. Describe %lie N+ai-I ;,, v-c ,
map and text forms. I- nclude circulation concepts to the
extent that they reinforce the land use plan. Propose and
describe design theme or themes for the commercial dis-
tricts. This is to be based on a vision or image of what
the downtown area's appearance should be. Review with
staff, Planning Commission and City Council in workshop
mode.
Products: 1. Draft land use plan.
2. Plan revisions
Time: 4 weeks
Budget: $3,000
2
TASK 7: MARKET CRITIQUE
Review draft land use plan and provide critique from market
standpoint. Suggest plan modifications for optimum market
potential.
Product: 1. Memorandum report.
Time: 1 week
Budget: $1,000
TASK 8: STREETSCAPE PLAN
Prepare suggested streetscape sections illustrating right -
of -way and improvements, landscaping, street furniture, set-
backs and building relationships. Prepare a recommended
plant palette that reinforces existing positive streetscape
features and contributes to the overall recommended
theme(s).
Product: 1. Streetscape plan
Time: 2 weeks
Budget: $2,800
TASK 9: SIGN PROGRAM
Based on the design theme or themes, land use plan, street -
scape plan and current sign ordinance, prepare a set of sign
guidelines and illustrations.
Product: 1. Sign program and design guidelines.
Time: 1 week
Budget: $1,000
TASK 10: PARKING NRUGkAM
Based on the land use plan, streetscape concepts, and the
current City parking ordinance, evaluate parking needs and
prepare recommended parking design standards, ratios and
location criteria, with an emphasis on High Street and
Moorpark Avenue.
Product: 1. Parking plan with design guidelines.
Time: 1 week
Budget: $1,600
TASK 11: DESIGN WORKBOOK
Based on the products of Tasks 6 through 10, prepare a loose
leaf notebook describing desirable design treatments, pri-
marily along the major thoroughfares and, to the extent nec-
3
essary, in the residential neighborhoods. This will be a
combination of narrative and illustrations in such a format
that pages may be copied and given to property owners, busi-
ness proprietors and developers to guide their project de-
sign.
Product: 1. Design workbook.
Time: 3 weeks
Budget: $3,200
TASK 12: IMPLEMENTATION PLAN
Prepare a set of recommended implementation actions for car-
rying out the plan. Include potential property owner, busi-
ness community, neighborhood residents and City actions.
List and describe the advantages and disadvantages of such
financing alternatives as redevelopment project area desig-
nation, use of community development block grant funds,
specific plan cost recovery program and various improvement
district approaches.
Product: 1. Implementation plan.
Time: 3 weeks
Budget: $4,000
TASK 13: RECOMMENDED INCENTIVES
Considering reactions to the list of candidate list of in-
centives from Task 5, the land use plan from Task 6, the
design guidelines from Task 11 and the implementing actions
from Task 12, prepare a set of incentives measures to be
incorporated in the draft report.
Product: i. Recommended incentives.
Time: 1 week
Budget: $400
TASK 14: DRAFT REPORT
Prepare and print 30 copies of the draft report incorporat-
ing products of all previous task, either as a part of the
recommended plan or appendix thereto. Review with the
staff, Planning Commission and City Council.
Product: 1. Draft report.
Time: 2 weeks
Budget: $1,000
4
TASK 15: FINAL REPORT
Incorporate changes resulting from the draft review and pub-
lish 30 copies of the final report. Unit costs are expected
to range from $5 to $10, depending on size, graphics and
cover stock.
Product: 1. Final report
Time: 3 weeks
Budget: $750
TASK 16: MEETINGS
This proposal includes provisions for a total of 13 meet-
ings, presently distributed as follows:
1 Interview City Council /Planning Commission
1 Meeting with business community
5 Meetings with staff
1 Joint Planning Commission /Council workshop
1 Design Standards Committee meeting
2 Planning Commission meetings
2 City Council meetings
The time and sequence of these meetings may vary at the mu-
tual agreement of the planning director and the consultant.
Additional meetings may be scheduled and added to the budget
on a time and materials basis.
Time: Throughout the study
Budget: $5,000
5
B. BUDGET /TIME SUMMARY
(See attached exhibit).
Task
Description
Time in
Weeks
Fee
1
Land Use Analysis
4
$ 3,200
2
Railroad Use
2
2,000
3
Guidance Package
4
2,000
4
Market Potential
1
1,000
5
Potential Incentive Measures
1
1,200
6
Draft Land Use Plan
4
3,000
7
Market Critique
1
1,000
8
Streetscape Plan
2
2,800
9
Sign Program
1
1,000
10
Parking Program
1
1,600
11
Design Workbook
3
3,200
12
Implementation Plan
3
4,000
13
Recommended Incentives
1
400
14
Draft Report
2
1,000
15
Final Report
3
750
16
Meetings
Ongoing
5,000
TOTAL ESTIMATED FEES:
$33,150
This budget includes normal reimbursable costs (i.e.,
travel, printing, reproduction) in accordance with specifi -
cations herein. Additional work outside the Scope of Work
will be billed as additional expense upu.i ri _ -=
proval.
The hourly rate schedule is as follows:
Principal
Senior Project Manager*
Project Manager
Senior Planner
Associate Planner
Graphic Artist
Word Processing
$90.00
$90.00
$70.00
$60.00
$50.00
$35.00 to $50.00
$25.00
* Note: Mr. Al Bell is designated as project manager and
will participate in scheduled public meetings.
C. PROJECT BILLING
Monthly billings will be for staff time and expenses in-
curred during the period, to be payable within 30 days of
invoice rate.
The following benchmarks will be used for monthly billing
purposes. Billing may not exceed the following percentages
until the referenced product is submitted:
A.
Draft
Land Use Plan
37.4%
or $12,400
B.
Design
Workbook
29.0%
or $ 9,600
C.
Draft
Report (30)
16.3%
or $ 5,400
D.
Final
Report (30)
17.3%
or $ 5,750
TOTAL: 100.0% or $33,150
7
D. ACKNOWLEDGEMENT
If the foregoing arrangement is satisfactory to you, please
indicate your agreement and formal authorization to proceed
by executing the original of this proposal /agreement, where
noted, and returning the signed copy to this office.
The attached General Terms of Proposal is hereby made part
of this proposal /agreement. If you would like to discuss
our proposed approach to the project or desire any modifica-
tions, please advise Al Bell or Mike Ni han. We will begin
work immediately upon receipt of a signed copy.
Respectfully submitted,
THE PLANNING CE ER
chard E. Ra ella
Principal
RER: AB/ 11s
P9.22
Approved and consented to on this
City of Moorpark
/ V-164
A Bell
Project Manager
day of , 1987 by:
0 BUS. /PC /CC MTG.
STAFF MTG. MOORPARK DOWNTOWN STUDY
• PRODUCTS TIME SCHEDULE
DRAFT OR FINAL REPORT
ne'r9=.Q .0 IMF= .JULY AUGUST SEPT. 'OCT. NOV.
TASKS v^ w .....
8 15 22 29
6 13 20 27
3 10 17 24 31"7
14 21 28
5 12 19 26
2 9 16
ASK 1 4 weeks)
♦Qlrite,� OB
S. MTG.
LandUse Analysis
TASK 2_12 weeks)
Railroad Uses
TASK 3
Guidance Package
TASK 4 (1 week)
�•
Market Potential
TASK 5 (1 week)
�.•
Potential Incentives
TASK 6 (4 weeks)
♦ O MINT FC
/CC
Draft Land Use Plan
TASK 7 (1 week)
Market Critique
TASK 8 (2 weeks)
�••�� O
DESIGN T D
COM.
.
Streetsca a Plan
TASK 9 (1 week)
mmme
Sin Program
TASK 10 (1 week)
Parking Plan
TASK 11 (3 weeks)
Design Workbook
TASK 12 (3 weeks)
Implementation Plan
TASK 13 (1 week)
Recommended Incentives
TASK 14 (2 weeks)
O O
Draft Report
—PC cc
TASK 15 (3 weeks)
Final Report
Task 16 (On gokV
Meetinos (13) .
GENERAL TERMS OF AGREEMENT
These terms are generally applicable to the proposal to which they are attached.
However, terms included in the proposal are specifically applicable and shall prevail
it they conflict with these general terms.
1. EFFECTIVE DATES This proposal will remain in effect for a period of 30
days. The Schedule of Charges upon which the included estimates of cost are
based will remain in effect for at least six months.
2. AUTHORIZATION TO PROCEED A signed copy of the proposal will be
accepted as authorization to proceed with the work outlined. The copy that is
returned for this purpose shall have been signed by one with the authority to
accept the proposal and these terms.
3. UNANTICIPATED DELAYS The work proposed will begin as soon as authori-
zation to proceed is received and will be completed as soon as practical.
However, inclement weather, obstructions, changes of plans, and other fac-
tors over which the consultant has no control can cause completion of the
proposed work to be delayed and costs to rise beyond preliminary estimates.
If such delays exceed ninety (90) days in duration, the client will be advised in
writing and this agreement will be reviewed and renegotiated as required
The Planning Center shall not be liable for time delays or damages resulting
from the actions or inactions of government agencies, including but not limited
to, permit processings, environmental impact reports, general plans and
amendments Jhereto, zoning matters, etc Furthermore, changes in govern-
ment plans, policies, programs or ordinances may be a basis for renegotiation
of this agreement
4. COST OF WORK Preliminary estimates of cost included in the proposal are
only estimates based upon prior experience with the type of work outlined.
The cost or work performed will accrue in accordance with the current schedule
of charges. However, work will be limited by the amount of the included total
of estimated costs. Work will be conducted in an efficient manner with the
estimated costs in mind. If any increase in scope or cost is considered
necessary, client will be advised and asked to authorize the additional work
Unless a specific plan is agreed to, in advance, and in writing, all extras will be
invoiced on a time and materials basis using our standard billing rates, a copy
of which will be supplied on request Billing rates are revised from time to time
and the current version will be used for invoicing.
5. RESPONSIBILITY OF CONSULTANT The consultant will perform the work
proposed utilizing personnel who are properly qualified by training and experi-
ence to perform the tasks assigned to them, equipment that is suitable, and
techniques that are appropriate. Work will be done by or under the direction of
properly qualified professionals who endeavor to maintain high standards of
professional competence, recognizing that the state -of- the-art is constantly
improving.
Reports that are provided will present the results of the work performed clearly,
and explanations will be made if necessary. Additional copies of reports will
- be provided at cost of reproduction.
Supplementary reports or additional work not included in the scope of the pro-
posal will be subject to future agreement between the client and the consul-
tant, and costs will accrue in accordance with the schedule of charges in
effect at the time.
6. INSTRUCTIONS AND APPROVALS The Planning Center shall act in full
cooperation with the Client in providing services. The actions of The Planning
Center shall be subject to the instructions and approvals of the Client signified
through the Client's authorized official. Such officiat shall be available to The
Planning Center at all reasonable times.
11. CONFIDENTIALITY Information that is obtained by The Planning Center in
the course of performance of work proposed will be considered to be the pro-
perty of the Client who authorizes and subsequently pays for the work
Reports will be distributed as directed and release of any information held will
be subject to the approval by the Client
12. TERMINATION If at anytime during conduct of work proposed, the Client or
The Planning Center decides that the Consultant's services are no longer
required those services may be terminated by 7 day written notice. An invoice
for costs accrued prior to receipt of notice will be issued After payment of the
amount of the invoice (and any other outstanding invoices) the Client may
obtain copies of all notes and records accumulated to that date, for which
payment has been received
If the project is put on hold by the Client for a period of time in excess of thirty
(30) days the Client shall, within 30 days, reimburse The Planning Center for
all fees and expenses incurred up to the time the project was put on hold
13. WRONGFUL CLAIMS Client agrees to pay The Planning Center and to save
The Planning Center harmless from all reasonable costs or attorneys fees
incurred in defending against wrongful claims against the firm growing out of
or caused by work done pursuant to this agreement
14. OWNERSHIP Following completion or termination of the contract, the Client
is entitled to ownership of all relevant notes, exhibits and reports accumulated
as part of said contract. However, subject to our Clients contrary directions, it
is our policy to destroy files, maps and reports left in our possession five years
after the final billing or conclusion of the project as signified by a final report
or final Public hearing.
Computer programs prepared by The Planning Center in connection with this
project shall remain the property of The Planning Center.
15. EMPLOYEE SOLICITATION The Client shall not offer to employ or employ
any employee of The Planning Center during the terms of this agreement or
for a period of six (6) months after the completion of the services or work
under this agreement Likewise, the client or his employees shall not seek
employment with The Planning Center during this same period of time.
16. USE OF CLIENT NAME The Client agrees that The Planning Center has the
authority to utilize its name as a Client and a general description of the
project, work or service performed as a reference to other clients.
17. REIMBURSABLE EXPENSES Charges for out -of- pocket expenses for ser-
vices, equipment and facilities not directly furnished by The Planning Center,
and any unusual items of expense not customarily incurred in our normal
operations, are computed on the basis of cost, plus 12'2 percent Such items
include, but are not limited to, computer charges, living and travel out of town,
printing and binding of reports, drawings and specifications, rental of equip-
ment and vehicles, and photographic processing.
16.
7. BILLING AND PAYMENT Time is of the essence in payment of invoices, and
timely payment is a material part of the consideration of any agreement be-
tween the Consultant and Client. Itemized invoices for services rendered will
be issued at the close of the calendar month during which they are provided
or on completion of the work proposed.
Any comments or discrepancies concerning the charges on a given invoice or
the quality or completeness of the services rendered must be submitted in
writing, within twenty -five (25) days. If no such comments are received, the
invoice will he considered correct.
If the Client fails to make any payment due The Planning Center for services
and expenses within thirty (30) days from the date of The Planning Center's
bill, the amounts due shall include a charge at the rate of 1 y2 percent per
month from said thirtieth (30th) day. In addition, The Planning Center may,
after giving seven (7) days written notice to the Client, suspend services or
withhold documents until payment has been received in full for all amounts
due for services and expenses that are sixty (60) days past due.
If any legal action is necessary to enforce the terms of this agreement, the
prevailing party shall be entitled to reasonable attorneys fees and for collec-
tion charges in addition to any other relief to which he may be entitled.
B. ACCESS Acceptance of the proposal confirms free access to subject site
with the understanding that reasonable precautions will be taken to minimize 19
disturbance of occupants and improvements. Owners and occupants of the
site shall be notified by the Client that the Consultant has been granted access
and permission to perform the work proposed Permission to perform the work
(and any permits that may be required) shall be secured by the Client.
9. PLANS AND SPECIFICATIONS If any plans that depict site conditions or
plans and specifications that depict grading or construction on the site are
accessible to the Client, copies should be provided for The Planning Center to
use in performance of the work proposed. Copies provided shall be legible, at
a suitable scale, and capable of being reproduced.
LIABILITY The Planning Centers liability under this Agreement shall be limited
to loss or damage attributable to acts of The Planning Center, its officers,
employees or agents in contravention of instruction or approvals referred to in
Paragraph 6, or to its willful misconduct or negligence; provided, however, (a)
in no event shall The Planning Center be liable for loss or damage occasioned
by delays beyond The Planning Centers control, and (b) in no event shall The
Planning Center be liable for loss of earnings, loss of production or other con-
sequential or incidental damages of any type or kind howsoever caused. The
Planning Centers liability, it any, shall be further limited to the amount of such
liability that is covered by professional indemnity insurance carried by The
Planning Center from time to time and available to indemnify The Planning
Center as to such liability.
The Client agrees to The Planning Centers limitations of liability stated above.
If the Client, because of its particular circumstances, desires to obtain any
insurance to protect it against any risk beyond the limitations described
above, The Planning Center will cooperate with the Client to obtain appro-
priate insurance at the Client's expense. The extra premium shall be billed to
the Client as a disbursement The Client shall have no right of setoff against
any billings of The Planning Center under this Agreement
person for damage to property or injury to or death of persons or for any other
damage, injury or loss of any native whatsoever arising out of the negligence
of any employees or agents of the Client who may participate with The Plan-
ning Center in performing the work under our Agreement The Client shall
indemnify and hold The Planning Center harmless for all loss and expense on
account of claims or lawsuits for injury to or death of any person or damage to
property or for any other damage, injury, or loss of any nature whatsoever aris-
ing out of the negligence or alleged negligence of any Client, employees, or
agents. Additionally, the Client shall indemnity and hold The Planning Center
harmless from all loss and expense on account of claims or lawsuits arising
out of injury to or death of any Client employee or agent from any cause while
such employee or agent is participating in work under this agreement.
ARBITRATION In the event that a disagreement arises on any issue (other
than invoicing, already covered in Paragraph 7) which the parties cannot
resolve themselves, it is understood and agreed that The Planning Center will
have the right to submit the issue to binding arbitration. If The Planning
Center chooses this course of action, the Client agrees to cooperate with The
Planning Center in the selection of a single arbitrator. If the parties cannot
agree on a single arbitrator, they will each name one and the two thus named
will select a third. A majority opinion shall be conclusive. The arbitrator(s) shall
also determine who will pay the fees for the arbitration. services.
10. PERTINENT REFERENCES Any reports in the possession of or subject to
the control of the Client that pertain to the subject of the proposal shall be Authoriz €d on this day of
made available to The Planning Center for use in performance of the work
proposed.
By:
Authorized Agent
19