HomeMy WebLinkAboutAGENDA REPORT 1988 0817 CC REG ITEM 11KJOHN PATRICK LANE
Mayor
ELOISE BROWN
Mayor Pro Tern
JOHN GALLOWAY
Councilmember
CLINT HARPER, Ph.D.
Councilmember
BERNARDO M. PEREZ
Councilmember
MAUREEN W. WALL
City Clerk
TO:
FROM:
DATE:
SUBJECT:
MOORPARK ITEM 11 k;.
M E M O R A N D U M
The Honorable City Council
Community Services Department
r ?�
August 10, 1988
STEVEN KUENY
City Manager
CHERYL J. KANE
City Attorney
PATRICK RICHARDS, A.I.C.P.
Director of
Community Development
R. DENNIS DELZEIT
City Engineer
JOHN V. GILLESPIE
Chief of Police
Curb, Gutter and Sidewalk Project - Need for
Additional Funds
As the City Council is aware, Mr. R.Z. Hernandez was awarded the
contract for City wide curb, gutter, and sidewalk repair in the amount
of $114,593.00 plus a loo contingency of $11,460.00 for a total
construction cost of $126,053.00. The scope of the project focused
upon areas of recently removed street trees which included the streets
of Shasta, Sierra, Whitney, Palomar, Diablo, Ruth, First, Sherman,
Dorothy, Sarah, Susan, Harry, Millard, Third, Second, North side of
High, and Laurelhurst /Lantern . Additionally, direction was given to
also include other areas where replacement of curb, gutter, and
sidewalks may be needed. Staff initially identified additional areas
of the greatest need to be included in the project area when bid.
Not included in this project are Everett, Charles, and Magnolia as well
as the cross gutter at the intersection of Charles and Bard. The City
Engineer recommends reconstruction of this area during the street
overlay project or overlay of the High Street sidewalk project as the
work involved to correct this corner differs from standard curb and
gutter replacement work.
Upon award of the project, staff began marking the areas outlined in
the bid documents for replacement. During the marking process, other
areas were observed to be included in the project. Staff initially did
not identify these areas as they were considered not to be of the
greatest need for replacement; however, if funds were available, those
additional areas could be included in the project.
799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864
Memorandum
August 10, 1988
Page 2
Mr. Hernandez has been contacted by the
extend current unit prices and time to
Staff has evaluated the additional areas i
contract to Mr. Hernandez, the total cost 1
gutter, and sidewalk of needed repair, as
cost $140,985.00, or $26,392.00 above the
($16,392.00 above existing contingency) .
City Engineer and he will
complete the full project.
t question. Including the
replace all areas of curb,
determined by staff, would
current awarded contract,
In the FY 1988/89 City Budget, funds in the amount of $50,000.00 were
budgeted in fund 03- 1142 -903 for City wide curb, gutter, and sidewalk
repair.
Staff Recommendation:
1. Approve the additional curb, gutter and sidewalk replacement in
areas specified above.
2. Authorize City Manager to negotiate with Mr. Hernandez for
additional work as outlined by staff to a maximum amount of
$154,000.00 (which includes a 10% contingency) . Balance of funds,
$27,947.00, would be from account 03- 1142 -903 ($50,000) which
would leave a balance of $20,000 for miscellaneous curb, gutter,
and sidewalk work during the balance of the fiscal year 1988/89.
M�iR C RK C.'1f.iF�►�N1
of
acrl ON
;
02
By
Q m m AV-j,/ O(z
vk
N 01-6
-CaOoA./
,
3 1 4Z7l.�
� o
iii
I (
Sf-
Asphalt Concrete
502 -3
5 �,OS —
5_C,.l��
S•�
Repair
Repair
2. I g
t -F
P.C.C. Curt) and
503-3.1
2.
112.
P.C.C. Curb and
503
Gutter Reconstruction
$_1_Y
_
3.
LF
P.C.C. Curb
503 -3.1
3.
Reconstruction Only
LF
P.C.C. Curb
503
-3.1
4. �Z`�
SF
P.C.C. Sidewalk
503 -3.2
X 00
i� ,a (v O
Reconstruction
4.
I S�(�i
5. Z 'gO
SF
P.C.C. Cross Gutter
503 -3.3
Reconstruction
Reconstruction
5.
-
SF
P.C.C. Cross Gutter
503
-3.3
$ �• "'
Total
...
S
(PI7
1-
Z% (p
SF
Asphalt Concrete
502
-3
Repair
2.
LF
P.C.C. Curb and
503
-3.1
$_1_Y
Gutter Reconstruction
3.
LF
P.C.C. Curb
503
-3.1
$
Reconstruction Only
4.
I S�(�i
SF
P.C.C. Sidewalk
503
-3.2
Reconstruction
5.
-
SF
P.C.C. Cross Gutter
503
-3.3
$ �• "'
Reconstruction
--
S
Total
I . % S St--
2 . (T L F
3. LF
4. SF
5. SF
1 SF
2. 'g LF
3. LF
4.(� SF
SF
VAtDW�-
502 -3
S `7 •
3 ����S7D
Repair
303 .-7 s�
��
P.C.C. Curb and
Asphalt. Concrete 502 -3
S
$
Gutter Reconstruction
Repair
P.C.C. Curb
P.C.C. Curt) and 503-3.1
3
$
Reconstruction Only
Gutter Reconstruction
P.C.C. Sidewalk
503 -3.2
Reconstruction
P.C.C. Curb 503 -3.1
S
Reconstruction Only
P.C.C. Cross Gutter
503 -3.3
S
S
,p
P.C.C. Sidewalk 503 -3.2
S
Reconstruction
P.C.C. Cross Gutter 503 -3.3
S
•� d
S
Reconstruction
-
S
Total
s 3I5
Asphalt Concrete
502 -3
S `7 •
3 ����S7D
Repair
��
P.C.C. Curb and
503 -3.1
S
$
Gutter Reconstruction
P.C.C. Curb
503 -3.1
S
$
Reconstruction Only
P.C.C. Sidewalk
503 -3.2
Reconstruction
P.C.C. Cross Gutter
503 -3.3
S
S
Reconstruction
Total
S
2_�' q
S1 �T-(-)
SF
Asphalt Concrete
50 ?
-3
3 �_j
Repair
SF
Asphalt Concrete
-�i'
-3
2. f-
P.C.C. Curb and
503
-3.1
Repair
Gutter Reconstruction
3- LF
P.C.C. Curb
503
-3.1
S
S
$
Reconstruction Only
S
_`
_L/___
4. SF
P.C.C. Sidewalk
503
-3.2
5 A.�D
S
Reconstruction
P.C.C. Curb
503
-3.1
$
5. SF
P.C.C. Cross Gutter
503
-3.3
S `�
$ y
Reconstruction
4_
Total
Total
Acs .
SF
Asphalt Concrete
502
-3
S
S
Repair
2.
_
L
P.C.C. Curb and
503
-3.1
$
`�
S
Gutter Reconstruction
3.
L
P.C.C. Curb
503
-3.1
$
S
Reconstruction Only
4_
Zt(p
SF
P.C.C. Sidewalk
503
-3.2
$
,1
Reconstruction
SF
P.C.C. Cross Gutter
503 -3.3
$_
Reconstruction
3
Total
Acs .
Total
1.
�qlp
SF
Asphalt Concrete
TRc�C
-3
$ �,� �
$ Z o
_
Repair
1. SV
Asphalt Concrete
502 -3
q_.flj
l
LF
Repair
503
-3.1
_
-
2. 3Q f f
P.C.C. Curb and
503 -3. I
Gutter Reconstruction
Gutter Reconstruction
3.
�.j
LF
P.C.C. Curb
3- g LF
P.C.C. Curt)
503 -3.1
S
�1,5
S_ 12 .
Reconstruction Only
4.2 SF
P.C.C. Sidewalk
503 -3.2
P.C.C. Sidewalk
503
-3.2
Reconstruction
Reconstruction
5. $ SF
P.C.C. Cross Gutter
503 -3.3
5.
SF
Reconstruction
503
-3.3
S
S
-
-
Reconstruction
S
Total
1.
�qlp
SF
Asphalt Concrete
502
-3
$ �,� �
$ Z o
Repair
2.
$
LF
P.C.C. Curb and
503
-3.1
$
$
Gutter Reconstruction
_
3.
�.j
LF
P.C.C. Curb
503
-3.1
$
$
Reconstruction Only
4.
2c�c�
SF
P.C.C. Sidewalk
503
-3.2
p t
Reconstruction
5.
SF
P.C.C. Cross Gutter
503
-3.3
S
S
Reconstruction
Total
S
$ �rte kN
I.
Sf-
/Asphalt. Concrete
50?
-3
S
�•��
�_
���,��
Repair
SF
Asphalt Concrete 502 -3
S �f— _ S
`' A
Repair
2.
-4
2.
P.C.C. Curb and 503 -3.1
1.F
P.C.C. Curb and
503
-3.1
Gutter Reconstruction
•.—
3.
Gutter Reconstruction
LF
P.C.C. Curb 503 -3.1
$ $
3.
LF
P.C.C. Curb
503
-3.1
S
✓__
S
C/
$ , $
�-`��• i
Reconstruction Only
Reconstruction
5.
-6-
SF
P.C.C. Cross Gutter 503 -3.3
S
L i
4.
SF
P.C.C. Sidewalk
503
-3.2
S
S
Reconstruction
Total
I
r Q
5._
SF
P.C.C. Cross Gutter
503
-3.3
S
S
Reconstruction
�j
SF
Asphalt Concrete 502 -3
S �f— _ S
`' A
Repair
2.
-4
LF
P.C.C. Curb and 503 -3.1
Gutter Reconstruction
3.
3
LF
P.C.C. Curb 503 -3.1
$ $
Reconstruction Only
4.
SF
P.C.C. Sidewalk 503 -3.2
$ , $
�-`��• i
Reconstruction
5.
SF
P.C.C. Cross Gutter 503 -3.3
S
L i
Reconstruction
,f
Total
I
r Q
i
1. SF
2. g-- LF
3. C{-'Z LF
4. C f$ ('� SF
5. -6-- S F
fps
Lk
�cN�
502 -3
S
S
�
Repair
(
1- (o0
SF
Asphalt Concrete
502
-3
S A_..�.
S
P.C.C. Curb and
503 -3.1
Repair
S
Gutter Reconstruction
2.
( -F
P.C.C. Curt) and
503
-3.1
S _V/
S
IItt ,,QQ
`t D�,
Reconstruction Only .
Gutter Reconstruction
3. '2t�
LF
P.C.C. Curb
503-3.1
P.C.C. Sidewalk
S IL��
S- �S
S
Reconstruction Only
4.
SF
P.C.C. Sidewalk
503
-3.2
S�'•�D_
(�
S Z2�O•__
S
S
Reconstruction
5.
SF
P.C.C. Cross Gutter
503
-3.3
S
S v
Reconstruction
S
Total
1. SF
2. g-- LF
3. C{-'Z LF
4. C f$ ('� SF
5. -6-- S F
Reconstruction
Total
5
fps
3 40�
Asphalt Concrete
502 -3
S
S
�
Repair
P.C.C. Curb and
503 -3.1
S
S
Gutter Reconstruction
P.C.C. Curb
503 -3.1
$ •��
S
IItt ,,QQ
`t D�,
Reconstruction Only .
I�
P.C.C. Sidewalk
503 -3.2
$
S
Reconstruction
V
P.C.C. Cross Gutter
503 -3.3
S
S
Reconstruction
Total
5
1 .( 8SD sl
2 . _t)_ I f
3. V t LF
4 . ( ( &jo SF
5. TO SF
Total
1 _
ST.
SF
2_11tilc-c" (#_ f+z«
Z ' TV AA Ps C bO
502
-3
S `"� b�
S 0Q, -b
Repair
n5_
t:5
L . a'►.II
Asphalt Concrete
502
-3
S
Repair
00.
2.
P.C.C. Curb and
503
-3.1
S
-3.1
S
Gutter Reconstruction
Gutter Reconstruction
P.C.C. Curb
503-3.1
S
{
I
3 % �2�o•7 "(J
Reconstruction Only
P.C.C. Curb
503
-3.1
$ �� .�
S�•�
P.C.C. Sidewalk
503
-3.2
S
4.o)
S (4-( 40
Reconstruction
4.
SF
P.C.C. Sidewalk
503
-3.2
L�S�
3 2�•
P.C.C. Cross Gutter
503
-3.3
S
Reconstruction
S
Reconstruction
-
_
y
S
Total
1 _
SF
Asphalt Concrete
502
-3
S `"� b�
S 0Q, -b
Repair
00.
2.
3S'
LF
P.C.C. Curb and
503
-3.1
S
$
Gutter Reconstruction
3.
-t
:. LF
P.C.C. Curb
503
-3.1
$ �� .�
S�•�
Reconstruction only
4.
SF
P.C.C. Sidewalk
503
-3.2
S "'`�
S
Z ��•
Reconstruction
y
5.
SF
P.C.C. Cross Gutter
503
-3.3
S
S
Reconstruction
�—
Total
I . �&— SF
2 $ L
3. �&- L F
4. ' ,g� SF
5. SF
1. 4o0 '. SF
2. --�D— L F
3. S•? ;: LF
SF
5. SF
.^ -f-z�
i
�' ��
/Asphalt Concrete 502-3
S
5
"r •�
Repair
Repair
P.C.C. Curb and 503
-3. 1
Gutter Reconstruction
P.C.C. Curb and
503 -3.1
S
3
P.C.C. Curb 503
-3.1
Reconstruction Only
P.C.C. Curb
503 -3.1
$
�j•�
��00
105���
Reconstruction Only
P.C.C. Sidewalk 503 -3.2
S
5__-73(4--__
Reconstruction
P.C.C. Cross Gutter 503 -3.3 S ✓ S
Reconstruction
- = 3
Total
Total
_ g�9
�' ��
Asphalt Concrete
502 -3
5
"r •�
S
Repair
P.C.C. Curb and
503 -3.1
S
3
Gutter Reconstruction
P.C.C. Curb
503 -3.1
$
�j•�
S
105���
Reconstruction Only
P.C.C. Sidewalk
503 -3.2
$
Y • 06
00
Reconstruction
P.C.C. Cross Gutter
503 -3.3
S
S
Reconstruction
Total
_ g�9
Reconstruction
Total
1.
'.
SF
Asphalt Concrete
502 -3
Z TG Per.
H AZ (�
2.
,,
LF
P.C.C. Curb and
503 -3.1
Gutter Reconstruction
3.
LF
P.C.C. Curb
503 -3.1
1 . i f'Q
SF hsp ial t. Concrete
502
-3
S r - ID
P.C.C. Sidewalk
503 -3.2
f:epa i r
Reconstruction
5-
_ ='
SF
P.C.C. Cross Gutter
503 -3.3
Reconstruction
2.
1 V P.C_C. Curb and
503
-3.1
S —
- --
Gutter Reconstruction
3. %)�
LF P.C.C. Curb
503
-3.1
S
Reconstruction Only
4. SO?
S P.C.C. Sidewalk
503
-3.2
5�.�l7
Reconstruction
5.
SF P.C.C. Cross Gutter
503
-3.3
l/
S
Reconstruction
Total
1.
'.
SF
Asphalt Concrete
502 -3
Repair
2.
LF
P.C.C. Curb and
503 -3.1
Gutter Reconstruction
3.
LF
P.C.C. Curb
503 -3.1
Reconstruction Only
4.
Q
SF
P.C.C. Sidewalk
503 -3.2
Reconstruction
5-
_ ='
SF
P.C.C. Cross Gutter
503 -3.3
Reconstruction
Total
$ ((• S� s S7 S.
S
S 2Z,ZG�fS�