HomeMy WebLinkAboutAGENDA REPORT 1988 0217 CC REG ITEM 08MMOORPARK ITEM�
JOHN GALL OVMAY
STEVEN KUENY
Mayor
City ManW
MOISE BROWN
CHERYL J. KANE
Mayor Pro Tim
qty Attorney
CUNT HARPER. Ph.D.
PATRICK RiCHARDS, A.I.C.P.
Councllm«nber
o
Director of
JOHN PATRICK LANE
Community Development
member
R. DENNIS DELZER
MAUREEN W. WALL
City Enpkieer
CRY Clerk
JOHN V. GUESPIE
THOMAS R GENOVESE
Chlef of Poke
City fta"er
TO: The Honorable City Council
FROM: John F. Knipe, Assistant City Engineer
DATE: February 9, 1988
SUBJECT: Change Order No. 2 For the Tierra Rejada Bridge
Project
BACKGROUND INFORMATION
The Tierra Rejada Bridge is currently under construction by
the Myers- McKean Construction Company. The contractor has
requested the use of an alternative pile design for abutment
No. 1 on the north side of the Arroyo Simi. The present
design calls for CIDH (Cast -In Drilled Hole) Piles.
The contractor's reasons for requesting an alternative pile
design are as follows:
1. With the CIDH pile, the entire depth of the hole
(approximately 60 feet) must be dewatered. This
could result in a significant amount of time and
delay because of the current winter construction
and subsequent high ground water levels.
2. A longer period of time must pass before any load
can be applied on the cast -in drilled hole piles
due to the curing time for concrete. Therefore,
other project work on or adjacent to these piles
cannot begin until after the curing time.
The design engineer in
consultant has reviewed
that will provide the
cast -in drill hole pile
design engineer to the
design criteria and type
conjunction with the geotechnical
and approved an alternative pile
same structural integrity as the
Attached is a letter from the
City Engineer that outlines the
of pile that will be used.
799 MOWPWk A"MA MOOrpArk, C IIMb"ft 9M (W5) $29.8$84
Page -2-
In order to facilitate the design change, the City Engineer
has prepared Change Order No. 2. This change order replaces
Item No. 29 in the bid specifications for CIDH pile with the
new 13 -3/8 inch OD steel pipe pile. Attached Change Order
No. 2 will provide for the new steel pipe pile to replace
the CIDH pile at the original contract price for CIDH pile
and there is no additional cost to the City for this change
order.
Also included in the change order is an amount deducted for
the extra fees associated with the design engineer and the
soils engineer. This amount is for the consultants time to
analyze the various alternatives proposed by the contractor
and provide a new design to facilitate the use of the steel
pipe piles.
RECOMMENDED ACTION
Approve Change Order No. 2 to replace CIDH piles at no extra
cost with steel pipe piles in abutment No. 1 of the Tierra
Rejada Bridge.
MpoRPARK
Of ), Coun'. I/ro RN/
MA�t�n q
ACT -1 -� 1989
By
JFK:MGW:1s
Encl.
cc: Steve Kueny, City Manager
R. Dennis Delzeit, City Engineer
Mark Wittgraf, Project Engineer
Fred Fulkerson, Resident Inspector
JN 30141
CMO687.COU
CITY OF MOORPARK
Change Order
to
PROJECT TITLE Tierra Re.iada Road and Bridge Project
CONTRACTOR Myers - McKean
CHANGE ORDER NO. 2
All work shall conform with the Standard Specifications, the Special
Provisions and supplemental reports dated January 25, 1988 from the design
engineer and January 19, 1988 from Moore and Tabor, Geotechnical Engineering
Consultants for the Tierra Rejada Road and Bridge project.
The following changes are hereby made to the Contract Documents:
Replace Item No. 29 16 -inch CIDH pile with "Furnish and install open end
pile 13 -3/8" O.D. per Caltrans Alternative "W ".
PAYMENT
CHANGE UNIT
CHANGED
REVISED ITEM REFERENCE
QUANTITY PRICE
TOTAL
29. Furnish and install 503 -3
N/A Lump Sum
3 50,000
open end pipe pile
13 3/8" O.D. per
Caltrans Alterna-
tive "W"
Deduct for pile
3 - 1,724
redesign at abut-
ment No. 1 per the
contractor's request
and in accordance
with Section 3 -1.2
of the SSPWC.
Net Total
$ 48,276
All work to furnish and install the 13 -3/8" O.D. pipe pile to the design
bearing and specified tip elevations as shown in the supplemental reports
dated January 19 and January 25, 1988 shall be at the original contract unit
price for 16 inch CIDH pile less the redesign cost, and "not -to- exceed" the
lump sum of $48,276.
APPROVALS REQUIRED:
Recommended byeProjec
Engineer date
Accepted by —
Su contra r - McKean date
Accepted by
Approved by
Approved by
Approved by
Contractor - C.C. Myers
City Manager
City Engineer
Mayor
JFK:MGW:jg
cc: Steve Kueny, City Manager
R. Dennis Delzeit, City Engineer
Mark G. Wittgraf, Project Engineer
Fred Fulkerson, Resident Inspector
JN 30141
BM0377.00
date
date
date
date
WILLDAN ASSOCIATES ❑ EN ;i ff\i'=176 &
January 25, 1988
Mr. R. Dennis Dalzait
City Engineer
City of Moorpark
799 Moorpark Avenue
Moorpark, California 93021
Subject: Tierra Rejada Road Bridge
Dear Mr. Delzeit:
As requested by the contractor, Bob McKean, we have reviewed the pile
design for Abutment No. 1 and have conferred with Moore & Taber and
Mr. McKean relative to substituting driven steel piles for the specified
CIDH concrete piles. Enclosed are two letters of recommendation from
Moore & Taber responding to various alternatives presented by the con-
tractor through Willdan.
A considerable amount of discussion, research, calculations, and evalua-
tions were performed by Willdan and Moore & Taber in order to respond
to the contractor's questions. A final alternative was decided upon by
the three parties through telephone discussions on .January 22, 1988.
This agreed upon alternative is presented in the enclosed sketches and
are as follows:
1. Except as otherwise indicated in these recommendations, all work
shall comply with the contract plans and specifications including
the referenced standard specifications and soils report. The sub-
stitution as described herein shall satisfy the design intent of
Caltrans Standard Plan B2 -5, Alternative W.
2. The CIDH concrete piles shall be replaced with sixteen 13 318 -Inch
CD x 0.438 -inch or 14 -inch ID x 0,375 -inch A -36 or better, open.
ended, steel pipe driven to a minimum 70 -ton bearing capacity as
calculated by the ENR formula. Piles shall also reach a tip eleva-
- at- least-405- univsr- refusal =ir -reached —as- -described-- ir.--.th
original soils report. If the proposed pipe has been previously
29C S. ANAHEIM BLVD.. SUITE '00 • ANAHEIM, CA 92805 -3896 a (213) 924 -1631 • (714) 774 -5740
Mr. R. Dennis Delzeit
City of Moorpark
January 25, 1988
Page 2
used, it shall be in sound condition with a uniform round shape
and free from dents and corrosion. Material certification shall be
submitted, or in lieu of that, a representative sample taken and
tested to prove strength of the metal. Lugs shall not be used
without specific prior approval. Piles that reach required tip but
not design bearing may be left to set up overnight before
continuing the driving.
3. The abutment and approach fill shall be placed as near as practi-
cable to the proposed finish subgrade at the backside of the abut-
ment and to the bottom of the abutment on the channel side. Fill
material shall be granular and non - corrosive in nature as accept-
able to engineer.
4. Piles shall be pre - drilled to elevation 445 with a 16 -inch diameter
auger to limit impact on adjacent sewer and storm drain lines dur-
ing driving. Annular voids remaining after driving shall be filled
with pea gravel.
5. The contractor is responsible for repairing or replacing to the sat -
Isfaction of the engineer and at no additional cost all adjacent sew-
er or storm drain piping which Is found to be damaged after pile
drlving is complete.
S. At the contractor's option, the bottom of the abutment may be
placed at a constant elevation of 465 or as otherwise acceptable to
the engineer. The abutment height would thus vary and the rein-
forcing would need to be revised accordingly.
If you have any questions, please call.
Very truly yours,
WiLLDAN ASSOCIATES
Henry M. Feilen
_ — Senior_ Engineer._. -- --- - -. —.
HF:bc
i
�P
t
i
i MO
b
_ w w t.•oll-
`rtrww-m^ Q -ETAP^
t S�t7ylY ¢y r_`__jI
w.ni Lcx-
� 4PrsrA• zi.n> oo_
yy OGNOTE3 Ptl6S
aATTgtt♦b .(O
_ � ] TYP•
1 '�f. - -W
ABUTMENT I PLAN
SCALE- 118' =1'-0'
O E�
G
w7—
C r-^--r- C+' 4,- t %yu =85'- 11u
_
--� —r -
-- — -
JN, S2,gvl 1-25 -88 5H-r7oF24.
,i 2EVtsc =n AyuYrn��,- P��tr.�
TIe.R'RA Z .1ADA TaRu-1c. Q
I
I
CITY OF MOORPARK
Change Order zw:
0
to `=
PROJECT TITLE Tierra Re.iada Road and Bridge Project
CONTRACTOR Myers - McKean
CHANGE ORDER NO. 2
/i V, /S/
C'.
All work shall conform with the Standard Specifications, the Special
Provisions and supplemental reports dated January 25, 1988 from the design
engineer and January 19, 1988 from Moore and Tabor, Geotechnical Engineering
Consultants for the Tierra Rejada Road and Bridge project.
The following changes are hereby made to the Contract Documents:
Replace Item No. 29 16 -inch CIDH pile with "Furnish and install open end
pile 13 -3/8" O.D. per Caltrans Alternative "W ".
APPROVALS REQUIRED:
Recommended by
Accepted by
Accepted by
Approved by
Approved by
Approved by
- McKean
,)—//7 _ V7
a-11) V
date
iy
C6ntrkctoe yers d e
City Manager date
_
City Engineer / da e
-/94S
a or date
JFK:MGW:jg
cc: Steve Kueny, City Manager
R. Dennis Delzeit, City Engineer
Mark G. Wittgraf, Project Engineer
Fred Fulkerson, Resident Inspector
JN 30141
BM0377.CO
-T,
rn
K"
m
PAYMENT
REVISED ITEM REFERENCE
29. Furnish and install 503 -3
open end pipe pile
13 3/8" O.D. per
Caltrans Alterna-
tive "W"
Deduct for pile
redesign at abut-
ment No. 1 per the
contractor's request
and in accordance
with Section 3 -1.2 -
of the SSPWC.
CHANGE
UNIT
CHANGED
QUANTITY
PRICE
TOTAL
N/A
Lump Sum
$ 50,000
$ - 1,724
Net Total $ 48,276
All work to furnish and install the 13 -3/8" O.D. pipe pile to the design
bearing and specified tip elevations as shown in the supplemental reports
dated January 19 and January 25, 1988 shall be at the original contract unit
price for 16 inch CIDH pile less the redesign cost, and "not -to- exceed" the
lump sum of $48,276.
-f'1
M
R7 l�
CIS