Loading...
HomeMy WebLinkAboutAGENDA REPORT 1988 0217 CC REG ITEM 08MMOORPARK ITEM� JOHN GALL OVMAY STEVEN KUENY Mayor City ManW MOISE BROWN CHERYL J. KANE Mayor Pro Tim qty Attorney CUNT HARPER. Ph.D. PATRICK RiCHARDS, A.I.C.P. Councllm«nber o Director of JOHN PATRICK LANE Community Development member R. DENNIS DELZER MAUREEN W. WALL City Enpkieer CRY Clerk JOHN V. GUESPIE THOMAS R GENOVESE Chlef of Poke City fta"er TO: The Honorable City Council FROM: John F. Knipe, Assistant City Engineer DATE: February 9, 1988 SUBJECT: Change Order No. 2 For the Tierra Rejada Bridge Project BACKGROUND INFORMATION The Tierra Rejada Bridge is currently under construction by the Myers- McKean Construction Company. The contractor has requested the use of an alternative pile design for abutment No. 1 on the north side of the Arroyo Simi. The present design calls for CIDH (Cast -In Drilled Hole) Piles. The contractor's reasons for requesting an alternative pile design are as follows: 1. With the CIDH pile, the entire depth of the hole (approximately 60 feet) must be dewatered. This could result in a significant amount of time and delay because of the current winter construction and subsequent high ground water levels. 2. A longer period of time must pass before any load can be applied on the cast -in drilled hole piles due to the curing time for concrete. Therefore, other project work on or adjacent to these piles cannot begin until after the curing time. The design engineer in consultant has reviewed that will provide the cast -in drill hole pile design engineer to the design criteria and type conjunction with the geotechnical and approved an alternative pile same structural integrity as the Attached is a letter from the City Engineer that outlines the of pile that will be used. 799 MOWPWk A"MA MOOrpArk, C IIMb"ft 9M (W5) $29.8$84 Page -2- In order to facilitate the design change, the City Engineer has prepared Change Order No. 2. This change order replaces Item No. 29 in the bid specifications for CIDH pile with the new 13 -3/8 inch OD steel pipe pile. Attached Change Order No. 2 will provide for the new steel pipe pile to replace the CIDH pile at the original contract price for CIDH pile and there is no additional cost to the City for this change order. Also included in the change order is an amount deducted for the extra fees associated with the design engineer and the soils engineer. This amount is for the consultants time to analyze the various alternatives proposed by the contractor and provide a new design to facilitate the use of the steel pipe piles. RECOMMENDED ACTION Approve Change Order No. 2 to replace CIDH piles at no extra cost with steel pipe piles in abutment No. 1 of the Tierra Rejada Bridge. MpoRPARK Of ), Coun'. I/ro RN/ MA�t�n q ACT -1 -� 1989 By JFK:MGW:1s Encl. cc: Steve Kueny, City Manager R. Dennis Delzeit, City Engineer Mark Wittgraf, Project Engineer Fred Fulkerson, Resident Inspector JN 30141 CMO687.COU CITY OF MOORPARK Change Order to PROJECT TITLE Tierra Re.iada Road and Bridge Project CONTRACTOR Myers - McKean CHANGE ORDER NO. 2 All work shall conform with the Standard Specifications, the Special Provisions and supplemental reports dated January 25, 1988 from the design engineer and January 19, 1988 from Moore and Tabor, Geotechnical Engineering Consultants for the Tierra Rejada Road and Bridge project. The following changes are hereby made to the Contract Documents: Replace Item No. 29 16 -inch CIDH pile with "Furnish and install open end pile 13 -3/8" O.D. per Caltrans Alternative "W ". PAYMENT CHANGE UNIT CHANGED REVISED ITEM REFERENCE QUANTITY PRICE TOTAL 29. Furnish and install 503 -3 N/A Lump Sum 3 50,000 open end pipe pile 13 3/8" O.D. per Caltrans Alterna- tive "W" Deduct for pile 3 - 1,724 redesign at abut- ment No. 1 per the contractor's request and in accordance with Section 3 -1.2 of the SSPWC. Net Total $ 48,276 All work to furnish and install the 13 -3/8" O.D. pipe pile to the design bearing and specified tip elevations as shown in the supplemental reports dated January 19 and January 25, 1988 shall be at the original contract unit price for 16 inch CIDH pile less the redesign cost, and "not -to- exceed" the lump sum of $48,276. APPROVALS REQUIRED: Recommended byeProjec Engineer date Accepted by — Su contra r - McKean date Accepted by Approved by Approved by Approved by Contractor - C.C. Myers City Manager City Engineer Mayor JFK:MGW:jg cc: Steve Kueny, City Manager R. Dennis Delzeit, City Engineer Mark G. Wittgraf, Project Engineer Fred Fulkerson, Resident Inspector JN 30141 BM0377.00 date date date date WILLDAN ASSOCIATES ❑ EN ;i ff\i'=176 & January 25, 1988 Mr. R. Dennis Dalzait City Engineer City of Moorpark 799 Moorpark Avenue Moorpark, California 93021 Subject: Tierra Rejada Road Bridge Dear Mr. Delzeit: As requested by the contractor, Bob McKean, we have reviewed the pile design for Abutment No. 1 and have conferred with Moore & Taber and Mr. McKean relative to substituting driven steel piles for the specified CIDH concrete piles. Enclosed are two letters of recommendation from Moore & Taber responding to various alternatives presented by the con- tractor through Willdan. A considerable amount of discussion, research, calculations, and evalua- tions were performed by Willdan and Moore & Taber in order to respond to the contractor's questions. A final alternative was decided upon by the three parties through telephone discussions on .January 22, 1988. This agreed upon alternative is presented in the enclosed sketches and are as follows: 1. Except as otherwise indicated in these recommendations, all work shall comply with the contract plans and specifications including the referenced standard specifications and soils report. The sub- stitution as described herein shall satisfy the design intent of Caltrans Standard Plan B2 -5, Alternative W. 2. The CIDH concrete piles shall be replaced with sixteen 13 318 -Inch CD x 0.438 -inch or 14 -inch ID x 0,375 -inch A -36 or better, open. ended, steel pipe driven to a minimum 70 -ton bearing capacity as calculated by the ENR formula. Piles shall also reach a tip eleva- - at- least-405- univsr- refusal =ir -reached —as- -described-- ir.--.th original soils report. If the proposed pipe has been previously 29C S. ANAHEIM BLVD.. SUITE '00 • ANAHEIM, CA 92805 -3896 a (213) 924 -1631 • (714) 774 -5740 Mr. R. Dennis Delzeit City of Moorpark January 25, 1988 Page 2 used, it shall be in sound condition with a uniform round shape and free from dents and corrosion. Material certification shall be submitted, or in lieu of that, a representative sample taken and tested to prove strength of the metal. Lugs shall not be used without specific prior approval. Piles that reach required tip but not design bearing may be left to set up overnight before continuing the driving. 3. The abutment and approach fill shall be placed as near as practi- cable to the proposed finish subgrade at the backside of the abut- ment and to the bottom of the abutment on the channel side. Fill material shall be granular and non - corrosive in nature as accept- able to engineer. 4. Piles shall be pre - drilled to elevation 445 with a 16 -inch diameter auger to limit impact on adjacent sewer and storm drain lines dur- ing driving. Annular voids remaining after driving shall be filled with pea gravel. 5. The contractor is responsible for repairing or replacing to the sat - Isfaction of the engineer and at no additional cost all adjacent sew- er or storm drain piping which Is found to be damaged after pile drlving is complete. S. At the contractor's option, the bottom of the abutment may be placed at a constant elevation of 465 or as otherwise acceptable to the engineer. The abutment height would thus vary and the rein- forcing would need to be revised accordingly. If you have any questions, please call. Very truly yours, WiLLDAN ASSOCIATES Henry M. Feilen _ — Senior_ Engineer._. -- --- - -. —. HF:bc i �P t i i MO b _ w w t.•oll- `rtrww-m^ Q -ETAP^ t S�t7ylY ¢y r_`__jI w.ni Lcx- � 4PrsrA• zi.n> oo_ yy OGNOTE3 Ptl6S aATTgtt♦b .(O _ � ] TYP• 1 '�f. - -W ABUTMENT I PLAN SCALE- 118' =1'-0' O E� G w7— C r-^--r- C+' 4,- t %yu =85'- 11u _ --� —r - -- — - JN, S2,gvl 1-25 -88 5H-r7oF24. ,i 2EVtsc =n AyuYrn��,- P��tr.� TIe.R'RA Z .1ADA TaRu-1c. Q I I CITY OF MOORPARK Change Order zw: 0 to `= PROJECT TITLE Tierra Re.iada Road and Bridge Project CONTRACTOR Myers - McKean CHANGE ORDER NO. 2 /i V, /S/ C'. All work shall conform with the Standard Specifications, the Special Provisions and supplemental reports dated January 25, 1988 from the design engineer and January 19, 1988 from Moore and Tabor, Geotechnical Engineering Consultants for the Tierra Rejada Road and Bridge project. The following changes are hereby made to the Contract Documents: Replace Item No. 29 16 -inch CIDH pile with "Furnish and install open end pile 13 -3/8" O.D. per Caltrans Alternative "W ". APPROVALS REQUIRED: Recommended by Accepted by Accepted by Approved by Approved by Approved by - McKean ,)—//7 _ V7 a-11) V date iy C6ntrkctoe yers d e City Manager date _ City Engineer / da e -/94S a or date JFK:MGW:jg cc: Steve Kueny, City Manager R. Dennis Delzeit, City Engineer Mark G. Wittgraf, Project Engineer Fred Fulkerson, Resident Inspector JN 30141 BM0377.CO -T, rn K" m PAYMENT REVISED ITEM REFERENCE 29. Furnish and install 503 -3 open end pipe pile 13 3/8" O.D. per Caltrans Alterna- tive "W" Deduct for pile redesign at abut- ment No. 1 per the contractor's request and in accordance with Section 3 -1.2 - of the SSPWC. CHANGE UNIT CHANGED QUANTITY PRICE TOTAL N/A Lump Sum $ 50,000 $ - 1,724 Net Total $ 48,276 All work to furnish and install the 13 -3/8" O.D. pipe pile to the design bearing and specified tip elevations as shown in the supplemental reports dated January 19 and January 25, 1988 shall be at the original contract unit price for 16 inch CIDH pile less the redesign cost, and "not -to- exceed" the lump sum of $48,276. -f'1 M R7 l� CIS