AWARD OF CONTRACT
ANNUAL STREET OVERLAY - 1989
BACKGROUND INFORMATION
ITEMjL�
STEVEN KUENY
City Manager
CHERYL J. KANE
City Attorney
PATRICK RICHARDS, A.I.C.P.
Director of
Community Development
R. DENNIS DELZEIT
City Engineer
JOHN V. GILLESPIE
Chief of Police
On August 10, 1989, the City received three (3) bids from
contractors for the Annual Street Overlay - 1989 Project.
The total bid amount for all seven alternate bid schedules
are as follows:
CONTRACTOR TOTAL BID AMOUNT
1. S.P. Milling $357,562.58
2. Granite Construction $359,221.00
3. P.W. Gillibrand $421,893.50
However, it is recommended that an award of contract only be
made on four of the bid schedules as follows:
BID AMOUNT
ALTERNATE SCHEDULE S.P. MILLING GRANITE GILLIBRAND
A. (Millard, Roberts, $170,039.00 $167,789.00 $206,557.00
Esther)
B. (Susan Avenue) $ 21,366.00
F. (Campus Park Drive - $ 21,788.50
west of College View)
G. (Campus Park Drive - $ 57,711.00
east of College View)
$270,904.50
$ 24,268.00
$ 23,907.00
$ 60,763.00
$ 28,220.00
$ 26,358.50
$ 61,991.00
$276,727.00 $323,126.50
799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864
I .
q
;w bidder for the recommended
if Milling. This contractor
;uilizi_ed to perform this work.
project is Southern
is experienced and
The remaining bid schedules for Dorothy Avenue, Ruth Avenue
and nitrry Street were added by the City Council during
preliminary budget review. However, these streets are not
re-�ommended for overlay at this time since these streets
were :slurry sealed in 1986 and show no physical sign of
needing an overlay at this time. These streets will
be monitored for possible overlay in the future.
With regards to the overlay of Campus Park Drive, it should
be pointed out that the overlay of streets with median curbs
can t,ave a problem with water ponding against the median
curb. To avoid this problem, overlay projects are designed
with a continuous overlay thickness from median curb to
outside curb and gutter. Though this is the least cost
alternative, it results in an asphalt build -up at the median
curb and a reduction in curb height. Another alternative is
to ccld plane the entire street width prior to the overlay.
This overlay project was bid with a continuous asphalt
overlay of Campus Park Drive. However, with the concurrence
of tze City Manager, it is recommended that the entire
street: width of Campus Park Drive be cold planed at an
additional cost of $16,000 prior to the overlay.
The budget for this project is $210,000. However the City
will be receiving approximately $238,000 in FAU funding for
a to'.al of $448,000. The FAU funds can be used for other
pr•oj(!(,ts, but is recommended for use at this time since this
projcc:t has already been bid and is ready now for
construction.
.
Tr.e anticipated construction schedule is as follows:
ITEM
1. i'tward Contract
2. Preconstruction Meeting
3. Notice to Proceed
4. Construction Period
DATE
September 6, 1989
September 12, 1989
September 18, 1989
September 18, 1989
to October 271 1989
t 28, 1989
• M?: NDED ACTION
[ s recommended that the City Council approve the
: w i_ ng :
1. Award the Annual Overlay Project (Schedules A, B,
F and G) to Southern Pacific Milling Company in
the amount of $270,904.50.
2. Approve the additional cost to cold plane Campus
Park Drive.
3.. Authorize the City Manager to approve amendments
to the contract not to exceed $27,100.
MOORPARK, CALIFORNIA
City Council Meeting
of z 1982
ACTION: GG?a1I7iYl�
MW
cc :,: Steve Kueny, City Manager
R. Dennis Delzeit, City Engineer
Mark G. Wittgraf, Project Engineer
James Pappas, Design Engineer
Ron Wilson, Sr. Public Works Observer
Fred Fulkerson, Sr. Public Works Observer