Loading...
HomeMy WebLinkAboutAGENDA REPORT 2014 0219 CCSA REG ITEM 10D ITEM 10.D. CITY OF MOORPARK,CALIFORNIA City Council Meeting of o?-/9-aoi4 MOORPARK CITY COUNCIL ACCTION: �/ AGENDA REPORT iya7- rig-4274 BY: tri, . � - TO: The Honorable City Council FROM: Jeremy Laurentowsk , Parks and Recreation Director J� BY: Jessica Sandifer, Management Analy DATE: February 7, 2014 (CC Meeting of Febru ry 19, 2014) SUBJECT: Consider Amendment to Agreement with Penfield and Smith for Additional Civil Engineering Services for Arroyo Vista Community Park and Resolution Amending the Fiscal Year 2013114 Budget to Fund the Work from the Transportation System Management Fund (2001) BACKGROUND On November 20, 2013, City Council approved an Agreement with Penfield and Smith (Penfield) to design the recreational trail system at Arroyo Vista Community Park (AVCP) and prepare construction plans and specifications. On December 18, 2013, the City Council approved an amendment to the Agreement for boundary survey services. DISCUSSION During the design process for the AVCP recreational trail improvements, the project civil engineer presented an opportunity to address several drainage issues in Parking Lots A and C, the inclusion of a Class II bicycle lane at the entrance to AVCP, and additional parking on the north side of the access road. The vehicular entrances at Parking Lots A and C tend to pond during rain events and staff feels that these issues should be addressed prior to repaving the parking lots later this year, or proceeding with the future recreational trail improvements. The ponding has caused the pavement at both locations to erode and has created pot holes and other pavement problems. Penfield will include a field survey and a set of grading and drainage plans to correct the drainage within these two areas. The proposed bicycle trail extension from the pedestrian bridge to Arroyo Vista Recreation Center (AVRC) will ultimately connect to the Class II bicycle lanes on both 112 Honorable City Council February 19, 2014 Page 2 sides of the access road leading to and from the park. The bicycle lanes currently stop and start on the west side of the median island, directly adjacent to Parking Lot A. However, due to the fact that there is not room on either side of the median island for a Class II bicycle lane, bicyclists are forced to merge and enter vehicular traffic to access the park. Staff feels that this portion of the access road should be improved with a class II bicycle lane and included in the overall design of the recreational trail system to provide a safe route of travel for bicyclists through the park. In addition, during the boundary survey that Penfield and Smith performed earlier this year, it was discovered that the existing wood rail fence on the north side of the park is not on the actual property line of the park. The property line is variable, but extends approximately eighteen feet to the north of the existing fence at several locations. In order to define the actual property line of the park, staff will move the existing fence to park boundary. The additional area created by the realignment of the fence provides an opportunity to add approximately twelve improved parking spaces adjacent to the access road north of Parking Lot C. This is the location where the proposed bicycle path intersects the pedestrian bridge. Penfield will design and prepare construction drawings for the improved parking area and include this revision to the plans and specifications for the recreational trail system at AVCP. FISCAL IMPACT The total cost for the agreement with Penfield & Smith is $78,465.00. The cost of the amendment is $15,563.00 plus a reimbursable expense budget of $3,000 for a total new contract amount of $97,028.00. A budget amendment is needed from the Traffic Systems Management Fund (2001) to fund this work. STAFF RECOMMENDATION (ROLL CALL VOTE) 1 Approve Amendment No. 2 with Penfield & Smith for Additional Civil Engineering Services related to the entrance of the access road and parking lot C at Arroyo Vista Community Park, and authorize City Manager to sign the amendment subject to final language approval of the City Manager and City Attorney; and 2. Adopt Resolution No. 2014-___ _ Attachment: 1 -Agreement 2 -Resolution 113 ATTACHMENT 1 AMENDMENT NO. 2 TO AGREEMENT BETWEEN THE CITY OF MOORPARK AND PENFIELD & SMITH FOR ADDITIONAL CIVIL ENGINEERING SERVICES FOR THE RECREATIONAL TRAIL SYSTEM AT ARROYO VISTA PARK This Amendment No. 2 to the Agreement between the City of Moorpark, a municipal corporation ("City"), and Penfield & Smith, a California corporation, ("Consultant") for additional civil engineering services for the recreational trail system at Arroyo Vista Community Park ("Agreement"), is made and entered into the ___ _ day of , 2014. RECITALS WHEREAS, on December 2, 2013, the City and Consultant entered into an Agreement for Civil Engineering Services for the Recreational Trail Improvements at Arroyo Vista Community Park (AVCP); and WHEREAS, on , the City and Consultant entered into Amendment No.1 to the agreement for boundary survey services for the recreational trail system at AVCP; and WHEREAS, the City and Consultant now desire to amend the Agreement to increase the compensation for services to be performed by Consultant by a total contract value of eighteen thousand five hundred and sixty-three dollars ($18,563.00), and document said agreement to amend by jointly approving Amendment No.2 to the Agreement. NOW, THEREFORE, it is mutually agreed by and between the parties to the Agreement as follows: I. Section 2, SCOPE OF SERVICES, is amended by replacing this section in its entirety as follows: "City does hereby retain Consultant, as an independent contractor, in a contractual capacity to provide civil engineering services, boundary survey services, and additional civil engineering services relevant to the entrance to the access road and parking lot C, as set forth in Exhibit B, Exhibit C, Exhibit D, and Exhibit E. In the event there is a conflict between the provisions of Exhibit B, Exhibit C, Exhibit D, and Exhibit E and this Agreement, the language contained in this Agreement shall take precedence. Consultant shall perform the tasks described and set forth in Exhibit B, Exhibit C, Exhibit D, and Exhibit E. Compensation for the services to be performed by Consultant shall be in accordance with Exhibit B, Exhibit C, Exhibit D, and Exhibit E. Compensation is increasing fifteen thousand five hundred and sixty-three dollars ($15,563) for the additional civil engineering services plus three thousand dollars ($3,000) for 1 114 reimbursable expenses from seventy eight thousand four hundred and sixty-five dollars ($78,465) to ninety seven thousand and twenty-eight dollars ($97,028) and shall not exceed the rates or total contract value of ninety seven thousand and twenty-eight dollars ($97,028) as stated in Exhibit B, Exhibit C, Exhibit D, and Exhibit E without a written Amendment to the Agreement executed by both parties. Payment by City to Consultant shall be in accordance with the provisions of this Agreement." II. Section 5, PAYMENT, is amended by replacing paragraph two in its entirety as follows: "The City agrees to pay Consultant monthly, in accordance with the payment rates and terms as set forth in Exhibit B, Exhibit C, Exhibit D, and Exhibit E and this Agreement based upon actual time spent on the above tasks. This amount shall not exceed ninety seven thousand and twenty-eight dollars ($97,028) for the total term of the Agreement unless additional payment is approved as provided in this Agreement." Ill. Remaining Provisions: Except as revised by this Amendment No. 2, all of the provisions of the Agreement shall remain in full force and effect. In Witness Whereof, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK PENFIELD & SMITH By: ___________ _ By: ______________ _ Steven Kueny, City Manager Hady lzadpanah, Principal Engineer Attest: Maureen Benson, City Clerk 2 115 1327 Del Norte Road, Ste 200 Camarillo, CA 93010 tel 805-981-0706 tax 805-981-0251 www.penfieldsmith.com &lnta Barbara Camarillo Santa Maria Lancaster Civil Engineering Land SuNeying Land Use Planning Construction Management & Inspection Traffic & Transportation Engineering Transportation Planning Structural Engineering Water Resources Engineering GIS EXHIBIT D Penfield &Smith January 8, 2014 City of Moorpark Parks, Recreation and Community Services Department 799 Moorpark Avenue Moorpark, CA 93021 Attn: Jessica Sandifer, Management Analyst Subject: Cost Proposal for Additional Services Arroyo Vista Community Park Access Improvement and Pathway Project Dear Ms. Sandifer and Mr. Laurentowski, W.0.21211.01 Penfield & Smith is pleased to submit this Cost Proposal for additional civil engineering services for survey, design and engineering of Parking Lot C and the Western Entrance Road of Arroyo Vista Community Park (AVCP), located at 4550 Tierra Rejada Road, Moorpark, California. UNDERSTANDING OF PROJECT REQUIREMENTS AND SCOPE OF WORK In accordance with our existing contract, Penfield & Smith has been asked by City Staff to survey, design and engineer improvements of Parking Lot C to improve existing poor drainage conditions and modify the layout and alignment of . the Western Entrance to improve traffic, bicycle and pedestrian flow. We propose • the following Scope of Work. SCOPE OF WORK Attend meetings, establish preliminary design and project management; Conduct a field topographic survey and prepare base mapping; Prepare and submit Design Development Plans for city review; and, Prepare and submit 90% and 100% Plans and Specifications at a scale of 1"=20'. The Plans and Speciations will be suitable for competitive bidding. 116 City of Moorpark January 8, 2014 Page 2 SERVICES NOT INCLUDED The following services and all other services not specifically listed herein are excluded: 1. Reimbursable expenses, such as photocopies, postage, shipping/delivery, mileage, prints, maps/documents. 2. Governmental and public agency fees, cost of bonds and taxes. 3. Title Company reports, services and fees. 4. Services by consultants other than P&S. 5. Services beyond the Scope of Work detailed above. CLIENT TO PROVIDE Client or co-consultant at Client's direction shall provide the following items to Penfield & Smith: 1. Access to the site to perform engineering investigation. 2. Support with Public Agency documentation signature and fees. 3. All project related reports and historical documents necessary to perform our services. 4. Landscape, Lighting, and Electrical Engineering services for the project. PROPOSED FEE AND METHOD OF PAYMENT Our proposed services will be performed on a time and materials (T&M), not-to-exceed (NTE) basis and shall be billed monthly at the rates then in effect. Charges for "time" include professional, technical and clerical support services provided by Penfield & Smith. "Materials" include all reimbursable expenses, such as photocopies, postage, shipping/delivery, mileage, plots, prints, maps/documents and outside consultant fees. Based on our understanding of your requirements and our experience with similar projects, we estimate that the fee required for our services, not including reimbursable expenses, will be as follows: Survey and Construction Documents Bidding and Construction Phase Services ADDITIONAL SERVICES $13,663.00 To be Included with Original Contract Services performed outside the scope of this agreement require written approval prior to performance of the work. Design changes by Owner/Client or designee after the start of design shall be considered additional services. Any work requested by Owner/Client that is outside the scope of this agreement will be identified by Penfield & Smith as such, and a fixed fee or not-to- exceed amount will be agreed upon prior to the start of the additional work. Compensation for additional services shall be in accordance with Exhibit "A", Penfield & Smith's Billing Rate Schedule currently in effect. TIME OF PERFORMANCE We propose to have the 90% Construction Documents for these additional services delivered to the City on January 17, 2014, such that the City can review and meet a grant application City of Moorpark January 8, 2014 Page 3 deadline of February 3, 2014 of the original project. The 100% Construction Documents will be delivered to the City by February 3, 2014. AUTHORIZATION Should you require additional information or wish to discuss this proposal further, please give me a call. My direct line is (805) 981-0706, extension 221. If the proposal is satisfactory, please issue an Agreement directing us to initiate the work. Our current fee schedule is attached. Thank you for considering Penfield & Smith for this project. Sincerely, PENFIELD & SMITH Scott Meckstroth, PE. RCE 63337 Senior Engineer/Project Manager Enclosures Glen H. Pace, P.E. RCE 61468 Principal Engineer W:\work\21000-21999\21211\Proposal\C0#1 Cost Proposal 21211.01.docx 1327 Del Norte Road, Ste 200 Camarillo, CA 93010 tel 805-981-0706 fax 805-981-0251 www.penfieldsrnith.com Santa Barbara Camarillo Santa Maria Lancaster Civil Engineering Land SuNeying Land Use Planning Construction Management & Inspection Traffic & Transportation Engineering Transportation Planning Structural Engineering Water Resources Engineering GIS EXHIBIT E Penfield &Smith January 30, 2014 City of Moorpark Parks, Recreation and Community Services Department 799 Moorpark Avenue Moorpark, CA 93021 Attn: Jessica Sandifer, Management Analyst Subject: Cost Proposal for Additional Services Arroyo Vista Community Park Access Improvement and Pathway Project Extra Parking Near Northern Boundary Dear Ms. Sandifer and Mr. Laurentowski, W.O. 21211.01 Penfield & Smith is pleased to submit this Cost Proposal for additional civil • engineering services for design and engineering of additional parking near the · northern boundary of the Park, as illustrated in the attached figure. UNDERSTANDING OF PROJECT REQUIREMENTS AND SCOPE OF WORK In accordance with our existing contract, Penfield & Smith has been asked by City Staff to design and engineer additional improvements for parking. We propose the following Scope of Work. ; SCOPE OF WORK Prepare a scale plan view layout of the proposed parking; prepare a typical • section; layout additional parking; and, prepare fine grading plans and details. ; This additional work will be incorporated within the original design. SERVICES NOT INCLUDED • The following services and all other services not specifically listed herein are • excluded: 1. Reimbursable expenses, such as photocopies, postage, shipping/delivery, mileage, prints, maps/documents. 2. Governmental and public agency fees, cost of bonds and taxes. 3. Title Company reports, services and fees. 4. Services by consultants other than P&S. 5. Services beyond the Scope of Work detailed above. 119 City of Moorpark January 30, 2014 Page 2 CLIENT TO PROVIDE Client or co-consultant at Client's direction shall provide the following items to Penfield & Smith: 1. Access to the site to perform engineering investigation. 2. Support with Public Agency documentation signature and fees. 3. Landscape, Lighting, and Electrical Engineering services for the project. PROPOSED FEE AND METHOD OF PAYMENT Our proposed services will be performed on a time and materials (T&M), not-to-exceed (NTE) basis and shall be billed monthly at the rates then in effect. Charges for "time" include professional, technical and clerical support services provided by Penfield & Smith. "Materials" include all reimbursable expenses, such as photocopies, postage, shipping/delivery, mileage, plots, prints, maps/documents and outside consultant fees. Based on our understanding of your requirements and our experience with similar projects, we estimate that the fee required for our services, not including reimbursable expenses, will be as follows: Construction Documents for Added Parking Bidding and Construction Phase Services ADDITIONAL SERVICES $1,900.00 To be Included with Original Contract Services performed outside the scope of this agreement require written approval prior to performance of the work. Design changes by Owner/Client or designee after the start of design shall be considered additional services. Any work requested by Owner/Client that is outside the scope of this agreement will be identified by Penfield & Smith as such, and a fixed fee or not-to- exceed amount will be agreed upon prior to the start of the additional work. Compensation for additional services shall be in accordance with Exhibit "A", Penfield & Smith's Billing Rate Schedule currently in effect. TIME OF PERFORMANCE We propose to have the 100% Construction Documents for these additional services delivered to the City by February 3, 2014, such that the City can review and meet a grant application deadline of February 3, 2014 of the original project. • 1:28· City of Moorpark January 30, 2014 Page 3 AUTHORIZATION Should you require additional information or wish to discuss this proposal further, please give me a call. My direct line is (805) 981-0706, extension 221. If the proposal is satisfactory, please issue an Agreement directing us to initiate the work. Our current fee schedule is attached. Thank you for considering Penfield & Smith for this project. Sincerely, PENFIELD & SMITH Scott Meckstroth, PE. RCE 63337 Senior Engineer/Project Manager Enclosures Glen H. Pace, P.E. RCE 61468 Principal Engineer W:lwork\21000-21999\21211 \Proposal\Drafts and Pieces\C0#2 Cost Proposal 21211.01 C.docx lB 121 J J ..... 0 ..... J CXJ ~ I---0 OJ U::: L() 0 (f) z --Q ~ _J . ..... ..... "" ..... * L1) 0 0 . '>.Ji' I I w 0 0 -u u <C 0 _\V ,, 0 --0 -JmM -- ---0 ~ 0 0 .. 0 0 n u T-1--1-1 ~ · 1 L ___ J I ---I ·I -~+ ___ T _ _J I t"-. 122 ATTACHMENT 2 RESOLUTION NO. 2014--- A RESOLUTION OF CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR 2013/2014 BUDGET BY APPROPRIATING $18,563.00 FROM THE TRAFFIC SYSTEM MANAGEMENT FUND (TSM) (2001) TO FUND ADDITIONAL CIVIL ENGINEERING SERVICES AND REIMBURSABLE EXPENSES FOR THE RECREATIONAL TRAIL SYSTEM AT ARROYO VISTA COMMUNITY PARK (CAPITAL IMPROVEMENT PROJECTS 7712, 7713, 7852) WHEREAS, on June 19, 2013, the City of Moorpark adopted the Operating and Capital Improvement budget for Fiscal Year 2013/14; and WHEREAS, the adopted budget included appropriation in CIP 7712 of $75,000.00 from the General Fund (1000) and in CIP 7713 of $442,444.00 from the TSM Fund (2001) and $132,556 in TOA Article 3 (2602) Fund; and WHEREAS, on October 2, 2013, the conceptual plan was approved by the City Council and a budget amendment of $85,000.00 was approved from the TSM Fund (2001) and appropriated equally to each project (7712, 7713, 7852); and WHEREAS, on November 20, 2013, the City Council approved an agreement with Penfield and Smith for Civil Engineering services to design the project; and WHEREAS, on December 8, 2013, the City Council approved Amendment No. 1 to the agreement with Penfield & Smith for a boundary survey and authorized a budget increase of $7,500.00; and WHEREAS, a staff report has been presented to the City Council requesting approval of Amendment No. 2 and additional appropriation to fund additional civil engineering services relative to the entrance to the access road and parking lot C at Arroyo Vista Community Park (Project 7852); and WHEREAS, a budget adjustment in the aggregate amount of $18,563.00 from the Traffic System Management Fund (2001) is requested for this work; and WHEREAS, Exhibit "A", attached hereto and made a part hereof, describes said budget amendment and the resultant impact to the budget line items. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: 123 Resolution No. 2014 --- Page 2 SECTION 1. A budget amendment in the amount of $18,563.00 from the Traffic System Management Fund (2001) as more particularly described in Exhibit "A", attached hereto, is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 19th day of February, 2014. Janice S. Parvin, Mayor ATTEST: Maureen Benson, City Clerk Exhibit A -Budget Amendment 124 Resolution No. 2014- Page 3 EXHIBIT A BUDGET AMENDMENT FOR Traffic System Management Fund (2001) for Civil Engineering Services and reimbursable expenses for the Arroyo Vista Recreational Trail System 2013/14 FUND ALLOCATION FROM: Fund Account Number Amount Traffic System Management Fund 2001-5500 $ 18,563.00 Total $ 18,563.00 DISTRIBUTION OF APPROPRIATION TO EXPENSE ACCOUNTS: Account Number Current Budget Revision Amended Budget 1000. 7800. 7712.9613 $ 75,000.00 $ -$ 75,000.00 2001.7800.7712.9601 $ 28,333.00 $ 1,000.00 $ 29,333.00 2001. 7800. 7713.9601 $ 28,333.00 $ 16,563.00 $ 44,896.00 2001. 7800. 7713.9642 $ 442,444.00 $ -$ 442,444.00 2602. 7800. 7713.9642 $ 132,556.00 $ -$ 132,556.00 2001.7800.7852.9103 $ 300.00 $ -$ 300.00 2001. 7800. 7852.9232 $ 2,893.00 $ 2,893.00 2001.7800.7852.9601 $ 32,641.00 $ 1,000.00 $ 33,641.00 2001.7800.7852.9642 $ 923,500.00 $ -$ 923,500.00 Total $ 1,666,000.00 $ 18,563.00 $ 1,684,563.00 Approved as to Form: * ~ ~ 125