HomeMy WebLinkAboutAGENDA REPORT 2014 0917 CCSA REG ITEM 09A ITEM 9.A.
CITY OP MOORPARK,CALIFORNIA
City Council Meeting
of 9—/7—A0/4
MOORPARK CITY COUNCIL
AGENDA REPORT Actor_/
BY: CA, . P -�
TO: Honorable City Council
\1g�,I
l i
FROM: Dave Klotzle, City Engineer/Public Works Director It
Prepared by: John Brand, Senior Management Analyst
DATE: September 5, 2014 (CC Meeting of 09/17/14)
SUBJECT: Consider Presentation on the Ventura County Waterworks District
No. 1 Moorpark Wastewater Treatment Plant Desalter Project
SUMMARY
A presentation on the proposed desalter project at the Moorpark Wastewater Treatment
Plant will be given to the City Council by Mr. Reddy Pakala, Director of Ventura County
Waterworks District No. 1 (District).
Water supply planning efforts and local water resource evaluation studies have
identified a large quantity of relatively poor quality water in the Las Posas Groundwater
Basin from Moorpark to Somis. Studies have been conducted by the District to develop
an understanding of the feasibility of pumping and desalting this poor quality
groundwater which could then be purveyed for beneficial use by municipal, industrial,
and agricultural customers. Water in the Las Posas Basin must be treated prior to use
because of the relatively high level of dissolved solids, sulfate and chloride
concentrations. One treatment method is a membrane treatment process which uses
reverse osmosis. The proposed desalination plant will be near Hitch Boulevard and
West Los Angeles Avenue, with the waste brine discharging into Calleguas Municipal
Water District's proposed "brine line," the Regional Salinity Conveyance Pipeline, which
will ultimately run from Simi Valley to the ocean at Port Hueneme.
FISCAL IMPACT
None.
STAFF RECOMMENDATION
Receive presentation on the Ventura County Waterworks District No. 1 Moorpark
Wastewater Treatment Plant Desalter Project.
37
ITEM 9.A.
4co
`" ,, Proposed Moorpark Desalter
Project Description
‘9,_____.0„„8„, Ventura County Waterworks District No. 1
Ventura County Water Works District No. 1 (District) serves approximately 38,000
customers encompassing nearly 20,000 acres including the City of Moorpark (City) as well
as the contiguous, unincorporated areas to the north and west of the City. Currently,
between 80% and 85% of the estimated 12,400 acre-feet of water delivered to the
District's customers consists of imported water; whereas, between 15% and 20% is
supplied by local groundwater wells owned and operated by the District.
The South Las Posas Groundwater Basin is a shallow aquifer that extends from the
community of Somis to the Moorpark College. Salinity levels in the shallow groundwater
aquifer have been increasing over the years, primarily due to ongoing point and non-point
sources from urbanization and agricultural activities in the region. Surface waters from
tertiary-treated wastewater from Simi Valley and the District, urban runoff; storm water
runoff; agricultural return flows; and perennial flows from the Arroyo Las Posas, are the
main source of recharge to the Basin. These surface waters recharge the East Las Posas
Basin and the shallow aquifer. The shallow aquifer in the South Los Posas basin,
approximately 200 feet deep with groundwater levels of roughly 50 feet below grade,
currently overflows into the Pleasant Valley Basin causing salinity problems for the City of
Camarillo.
The Moorpark Desalter project would extract salty groundwater from the shallow aquifer
at a newly-constructed wellfield and then treat the water at a state-of-the-art
desalination (desalter) plant for the removal of salts, including TDS, boron, 504, and
chloride. The end product would be a potable water that meets Title 22 domestic water
quality standards, and would be distributed to both Ventura County Waterworks Districts
Nos. 1 and 19 customers. The extraction of high-salinity groundwater would create
underground storage, allow for higher quality surface water to recharge, and create a
local water supply.
September 2014
1fl:1414:
Public Works Agency,
waterendSan(ahorr„; Ventura CountyWaterworks District No. 1
Department
' Moorpark Desalter Project Update
Presentation to the City of Moorpark
Reddy Pakala
Director,Water and Sanitation Department
Public Works Agency
September 17.2014
Purpose "ti RA:,,4)1
Why the Moorpark Desalter is Being Pursued by
Ventura County Waterworks District(WWD) No. 1 R
• Stabilize customers'water rates for Ventura County WWDs Nos. 1 and 19
Reduce dependence on imported water
3 Provide an emergency water supply and help drought-proof
Improve the local economy and create jobs
• Help the Calleguas Creek Watershed wastewater treatment plants to comply with salts
TMDLs adopted by the Los Angeles Regional Water Quality Control Board in October 2007
Salts will be exported to the Pacific Ocean via the Calleguas Municipal Water District's
(Calleguas)Salinity Management Pipeline
Create underground storage within the South Las Posas Basin to capture more surface water
for beneficial uses,improve groundwater quality,and increase local water supply
q• Improve groundwater quality and help reduce migration of salts from the South Las Posas
Basin to the East Las Posas Basin
Consistent with Fox Canyon Groundwater Management Agency(GMA)Resolution 2003-03
- Ventura County Waterworks Dlatncl No.1
Sudo 2
1
Moorpark Desalter%Ventura County WWD No. 1 Service Area
s
y -,-,-6-Z,.. vc Waterworks
- Ti District No.f
Watereerks Olstlot No.to (An*in rwo'1
Service An /
Area L7 /
l
Met Wed Ter Site/
PrMassE
Proposal WelOieht 94te '
eksorpark Desalfr r ,...,.. .�,
1111 •
dill
1111 . p\., Legend
° •'"' _�••-o. y a WStOtwofkl Dl9elp NO 1
Spnete Of ImIhIMCe BOlYleiry-79325 60 Oct05
•
Moorpark WNMYhM I_ I WTIalw01115 Ot5klct No I egltloAy
Treatment PION _$ 71 215175300.50
VonWra County Waterworks District No I
Sher J
Ventura County WWD No. 19 Service Area
_ -
;__ _ i•
' �, � i
-
gIr
J ; -_+� — ,
CLOS ANGELES ' •...,'—',...'"- t
I1 1 ,Ire ., 1030
r 0 ,. """"-d3
tin—
• . VMtera County Waterworks District No t
Sme.I
2
Groundwater Basins within Fox'
Canyon Groundwater Management Agency(GMA)
•
•
•
•.T.,:,,,-..,, ,,,, , . -r East East Las Posas ' •4.,,
.- ,,.•,..,, - '._.,_--,it.i.rr:. .4, q -, Basin
. . aair
lia- ' ' .. 4,..-C .11ifF3*-j't-I'''''":4, ..''.. V..- Ilbt•‘‘
.
. Proposed Moorpark
. • ,.
Desalter Project
.,
Oxnard Forebay
Basin
41)
CP
MI
*,
- • , '
South Las
Posas Basin
zr,
Santa Ross
Basin 1
1 ,.
Pacific •.k a Iiiriiiiii . cr4
Ocean
--L" ,t t - _ Legend
Oxnard Plain A
easin 1,,,,....7 ,r• ' . ,,1991 FCGMA Boundary , „
%los
Mar Balmy In.Jtio7 UNoi..the FCCM,%G Whfgai I Plan I equrr,
S/00 5
Map of South Las Posas Basin
v-L--,
A
-(Sh a Ho w A q uife r)
. .,
sh",thiliay
Water Qualify Contra/
Rang
, r
Potexead MfaMaNd
aldtifffiftler P.
m..„,...,,, A
411S
,
. -
,„0„,,,,„„ 1 •—...,,,f1 ...
re., P1 j -te
- k ,
1 <
.)". W , e. ..„,
NO , ...1•,-77 .;
Arroyo I ds POSJ, I
pr<„
T'
....I) • I..t 'ZA
if ,
...1 •'•
- .
Legena
Shoe 6
F-1 South Las Posas Basin Ven:1,41-1,11Pry W vorwatk, /5515”'Am f F..
..,:o....•,11.1.13ewnso,U wo a...WPC 0 2 500 A000 MOW
3
Fox Canyon Aquifer and Shallow Aquifer
A A•
200 -
-'fwonpAPSIProposed .- ..
asrylvlootl eAxsprk Doestfor
000' wlar- Protect
VI 3
ASR ASR /
771Sar1
b18402
4001 " shallow Aquifer
Stn PadroiSauqua
•— • FOX C /
SI M4�Whr i
.700' - >c..4"
p4.i,1e,
✓e,cv Snaps Fm
1200' 2
Ventura County Wafon•or0s Dnfnct No.1
Preliminary Design Report
• Estimated yield: 5,000 acre-feet per year
• Membrane process considered:
• Reverse osmosis—8-inch diameter
• Reverse osmosis->8-inch diameter
• Nanofiltration
• Electrodialysis removal
• Membrane process recommended:
• 8-inch diameter low pressure brackish water reverse
osmosis(RO)
• Post treatment
• pH stabilization with sodium hydroxide
• Disinfection—chlorination system
• Initial cost estimate:$50.0 million(wellfield and
water treatment)
~fora Caunfy Walerworkl aline No,
side 8
4
Field Testing
• First pilot well tests: November 2012
• Geophysical tests: November 2013
• Additional pump tests: 2014
r •
i IIs
•
•
Vonfrrr,,(:runty WatorworMs Dlslr,cI No I
Welllield Layout/Groundwater Pumping/Treated Water Quality
Total Number of Wells: 22
Production Wells: 20
Depth of Wells: 200 feet to 250 feet(Shallow Aquifer)
Maximum Pumping: 5,875 AF/yr(3,654 gpm)
Maximum Treated Water: 5,000 AF/yr (4.46 MGD)
(6.9 cfs)
Treated Water Quality
• Chloride: 50 mg/I
• TDS: 400 mg/I
"- Venture County Wlewor*•D,sIncI No.1
can iU
5
lin
art, e �"` e e ••
o oAPR. l
Proposed 1-414
i
Moorpark o O O 0 0 a- .'.
Desalter
Proposed x•,
0 0 0 0 W@I@leld
• , I r IM
_ • � L .
--F
r Y
•
Sallndy Management .TI�
Pipeline - - "- -....i.- - — IL
‘, L_
._..
--, -
,.. --„...
s '�►���.+(y 11.A - ^-why`- V
, , •� Ventura County Waterworks District Na.1
Moorpark Deealler Pilot Wells Protect
Ventura County Waterworks Donna!No.1
3-Dimensional Groundwater Modeling
Testing Operation of Project
Groundwater Flow Model with Particle Tracking Using Groundwater Vistas
Using U.S. Geological Survey's MODFLOW, Model Code -
Model Construction Model Calibration r Project Modeling
• Covers southern half of the • Period 1976—2006 • 30-year period
East Las Posas Basin quarterly stress two wet/dry
• 200 ft.x 200 ft grid spacing periods cycles
• Six layers, includes Fox • CALIBRATED AGAINST
Canyon, San Pedro, and MEASURED
Shallow Aquifer GROUNDWATER
ELEVATIONS and
• Stream flow routing calculates STREAM GAUGES
stream recharge and flow
volumes
Velours County Waterworks Drerncr No 1 .iii..
6
• - IL...-.". —,ii,-.it' :::• '•': ;.". 'I • -:'1 iiii •Int 0
_ . ,• •. --ten r '"`� ps•.1114;71,....,
ns=
y ry
A - _ i ti 1 ,t
lk:',.....,','..:,
�„_ .•.,,x ll. I Vrl ,. �°± nr : t,W,.o-.)'' tt YR.�_
oot
' fr+'
,,t''''''.....
?!- •-=.
,• - 6� r
'�+ r
s
V r , ,,., rO011 4 ' 4
3e '
Travel Time,Proposed Well Field Layout .ms P T " t:
Pumping from Layer 4 ' � � + ;# t us ..:--.:-.2'4,...,'
t , .....1!"••-••/ y • t rrl ,.
Particle Traces,Travel Time Yrs ,h, . � tt.st'
Layer r4 . f bwdi,„ wsi d
ItJtlrs td It. i,
... .. Valium County Waterworks District No.f .Slue 11
1-5
Location of Well Hydrographs1,_J
• Desalter Wells
V .4,1_,Moorpark WRF
Basins
I I East Las Posas
I I South Las Posas
I I West Las Posas Moo • rk
I. I Pleasant Valley
8F1
,-_
12G2 • 7B2
•BF1
.,......,,.., -o-
WNI INR0W.1U62)Shallow Aquifer)-lar Co.2 Scenario. /
.n =�
San Pedro Formation
Well 0.5 Miles from Project
wxl3N/leW./FS)San Pedro)-O...a..2 Scm.rios
_,00t 01OOIOr. ,.(fwo,.r„
7.v
Effect on Surrounding 1-
Shallow
xShallow Wells ..
from Project Pumping-
mmottiltrrat..0110
Shcle 15
Venture County Waterworks&solar No.I
.a..un of wx e,rq,.p. �—
3•1141.1.;
Fox Canyon Aquifer
Well 0.05 Mile from Project
Well IN/1.1.781(fog an.on)-9ar Cr.x Scomotie. •�' .7'eagglirrgavt-Y
F .�
Jo Fox Canyon Aquifer
]" Well 3.2 Miles from Project
9=a (Near Souris)
"O Wen 221/20Wlt1)Fox Conn)-Noe Car 2Scenarios
voc
Fox Canyon Well I
31 Miles from Project
(Near Somis)—
Ventura County Waterworks Distract No.1 Siuf"
8
Length of Arroyo -
Dry Weather Conditions
7-
iin,
With Project- Moorpark. f
Without Project
AiLik 711.11111111V
S
Ventura County~enemies Dhmct No.1
Slide 17
Other Infrastructure
• Connect to Ventura County WWD No. 1 water
distribution system
• Connect to Calleguas water distribution system for
wheeling with a metering station
• Treated water distributed to
WWDs Nos. 1 and 19 customers
(consistent with GMA export policy)
• SMP discharge station
• Calleguas Salinity Management Pipeline(SMP)
Ventura County Waterworks°Winer No.1
Sloe'8
9
Salinity Management Pipeline
0
:mrPark
Women Prase 71 Park t...Ca1ra1M
Onasw � --- e—=
—akwayw
Pnav It e � dwYw
...—_.._.__ & • 1
Mamma Wall000rm
AP1eu0unl TOO t N 1
f Sao PeosooliaioyWO01./.1,1 —J
Jasetr. 'sr"-311\ PP..,J ISmM Peso Allerrali=eye
',I Oarllnnt0 Phare IL ` L.r�Y—.'". '
1 ■•Caafallo wwew
Tha„yano Oaks AawrNPW
Ie
..-. a d ■Cawwewww
Rwaa.nan rrN
IP �APrWaMeY MP Comm,TP.. {�
:YNOCNaf11I 13.. rw
..............:
RounauounlalnWTP
non 111.$1040.100 Mo.Owato Legend
Hue no.,
Comma stew — Hueneme Outfall
Mose 1 __ s 4a/4y — Phase 1
wi PWM — Phase IA
— Phase 28
• s — nate 2C
— Phase 110
NNO
- Phase 2E
— Phase
...��..., ... Ventura County Waterworks OIstno f No 1
Shoe 19
Stakeholder Presentations
Name Date of Presentation
WWD No. 1 (Moorpark)Citizens'Advisory Committee May 8,2014
WWD No. 19(Somis)Citizens'Advisory Committee May 15. 2014
Calleguas Municipal Water District(Calleguas)Purveyors June 2, 2014
Calleguas Board of Directors June 4.2014
Las Posas Users Group(LPUG) June 25.2014
County of Ventura staff July 10, 2014
F94(/Wing,Cgou9r ,w02r, Ar gement Agency July 23, 2014
City of Moorpark September 17, 2014
• Ventura County Board of Supervisors(WWD No. 1) de20
10
Next Steps
Conduct additional field testing to confirm total number of wells 2014
Finalize 3-D model and prepare groundwater monitoring plan 2014
Financing plan—considering grants.bonds,and/or loans 2014
EIR preparation 2014/2015
Construction
• Wellfield 2015/2016
• Design—bid—award
• Five well increments
• Stress test—gpm
• Composite water quality for treatment design
• Membrane treatment
• Design-Build process
• RFQ/RFP
Operations Plan
• Operate the Project to comply with the adopted Mitigation and
monitoring plans
Ventura County WaferweF*s Distnct No.t
11