BACKGROUND
CITY OF MOORPARK
AGENDA REPORT
The Honorable City Council
ITT 1, .
_ D
Christine Adams, Director of Community Service(r-.'
September 6, 1995
Consider Revision of Park Master Plan for Arroyo Vista
Community Park
The City Council adopted the goals and objectives for the City
in August, 1995. As part of the objectives for the Community
Services Department, the Council directed that staff "develop a
proposed funding plan and recommended priorities for completion
of Arroyo Vista Community Park and reconcile phasing plans with
conceptual master plan."
DISCUSSION
Since the Arroyo Vista Community Park Master Plan (see attached)
was adopted there have been some significant changes in the
City, which may require that the adopted design be reconsidered.
In addition, the City Council has approved changes to the build
out of the park.
Since 1989, when the plan was adopted, the City has acquired
four new parks (Tierra Rejada Park, Mountain Meadows Park,
Country Trail Park, and Virginia Colony Park), which has
increased the amount of park land by approximately 20 acres.
The Arroyo Vista Community Park Master Plan indicated that
approximately 30 acres of the total 69 acres, would be utilized
for passive activity, such as picnicking and walking, including
a large lake in the center of the design.
Staff is of the opinion that the proposed lake may be a
maintenance and liability problem, and that there may be new
needs for the remaining 30 acres which have arisen since 1989.
It would be beneficial to have the Parks and Recreation
Commission, with specific direction from the City Council, to
schedule public meetings to identify the current needs of the
community and to recommend design alternatives to the City
Council.
0003-0t;
PARK PHASING
At buildout, (all 69 acres, developed per the adopted Park
Master Plan), the total cost of the park will be $16,134,018.
This is based on the estimates provided by BSI Consultants in
1988. A breakdown of the costs are in the attached copy of the
Park Master Plan.
The 1988 Master Plan divided the project by area, as a
recommendation of BSI, and was designed to spread out the costs
of the park over a period of time.
As park improvement funds for this park are limited, the Council
took action in 1992 to reduce the scope of the work in some
areas and to redefine the phasing plan. The actual park
construction, based on a modified Master Plan and done with the
architectural assistance of T.I. Maloney, Inc. in 1992, was
phased differently. This phasing was divided into two phases,
and included the Recreation Center and active recreation
facilities in the first phase and the passive open space area in
the second.
The following figures include all costs that are associated with
the construction of the park, to date, including the completion
of the Recreation Center and the recent site improvements.
Site Improvements $1,241,570
Recreation Center $1,902,615
Landscaping and Related Improvements $ 635,869
Miscellaneous Costs $ 218,696
TOTAL $3,998,750
This represents 24% of the estimate prepared in 1988 by BSI for
the entire 69 acre park.
PHASE I
Phase I includes: all infrastructure improvements for the west
36 acres of parkland, including water well irrigation, grading,
drainage, access road, and parking lots (3), park landscaping
for the west 36 acres of land, and construction of the
Recreation Center and 1/2 of the two -court gymnasium. This work
was completed in 1994, with the grand opening of the Recreation
Center in June of that year.
During 1994 and 1995, the City Council approved additional park
improvement funds for the construction of two softball fields,
sports lighting for one field, a playground, picnic shelter,
tables, benches, and barbecues, a restroom /concession building,
00U10 7
water and sewer extension to said restroom, and a multi -use
court. These improvements are almost completed, with the
restroom /concession building to be completed this fall.
Phase I Park Improvement Funds have also been used for other
capital costs at the park, due to unforeseen maintenance and
operational factors, such as the repair of the water well,
fencing for the water well, the oil treatment of the access road
to prevent dust, and the rail fence along the arroyo to limit
any motorized traffic from coming up from the arroyo onto the
park. The costs for these items were in an excess of $150,000,
mostly for the well and pump. These items are not part of the
original Master Plan, but are necessary improvements to the
park.
Other changes to the Master Plan included the multi -use court
improvement. The City Council took action to have a multi -use
court installed to address a need for a location for roller
hockey leagues in the City, and to provide a large concrete
surface for other possible uses in the future.
In summary, to date, the following improvements have been
completed or are funded and ready to complete, in Phase I:
• Completion of Phase I grading, irrigation, and
landscaping.
• Completion of Phase I of Arroyo Vista Recreation
Center, including westerly paved parking lot.
• Gravel access road and two large parking lots, with
oil treatment.
• Two softball fields with backstop and dug out fencing,
and ballfield lighting on south field.
• One playground area, with older children's play
equipment only.
• Large picnic shelter, with seating capacity of 50
people.
• Restroom / Concession Building near ballfields (ready
to construct).
• Multi -Use Court (currently under construction).
• Water and Sewer Line Extension to Restroom /
Concession Building (currently under construction).
• Water Well and Security Fencing (currently under
construction).
• Maintenance Fence area for storing equipment.
01:10
• Security Walkway lights from Recreation Center to
first easterly parking lot.
Staff has identified Phase I as all improvements on the now
developed park land. Using this definition, there are still
some capital projects in this phase which have not been funded
(future estimated costs, where known, are listed):
• Second basketball court (gymnasium extension)
• Additional meeting room (s)*
• Fully equipped kitchen*
• Ballfield lights for north field ($55,000)
• Aquatics Facility ($2 million)
• Playground Equipment for Preschool Aged Children
($40,000)
• Paved Access Road ($30,000)
• Third Softball Field ($30,000)
• Third Softball Field Lights ($55,000)
* Specific future improvements to the Recreation Center are not
identified in the 1988 Master Plan, but are proposed additional
improvements to the Recreation Center.
PROPOSED PHASE II
In discussing design alternatives for "Phase II ", one option may
be to consider some interim improvements, such as grading for a
driving range and /or batting cages, or another contracted use,
which might generate some funds toward the future permanent
improvement. Long term commercial uses, which would also
generate revenue for the City, could be considered such as the
development of a private health club, racquetball center,
skateboard park or BMX course. Performance Nursery has also
approached staff regarding an annual lease agreement for
approximately 1 acre of land at the southwesterly end of the
undeveloped portion of the park. This could possibly generate
approximately $500 per year toward future park improvements,
until the City is prepared to develop that portion of the park.
The Council should provide direction to staff and the Commission
regarding the above stated options.
001
PARKS AND RECREATION COMMISSION
The Commission will need some specific guidelines and direction
before they initiate their evaluation process. The previous
paragraphs discuss issues which must be included in the overall
recommendation. Staff is recommending the following process for
the Commission to utilize:
1) Council to provide specific direction, providing some
perimeters for items to be retained or dropped from the original
Park Master Plan, to consider for a revised Plan, such as
whether a lake is still desirable or if a Teen Center should be
sited in the park.
2) As a Commission, review the City Council's views and
direction for future improvements for Arroyo Vista Community
Park.
3) As a Commission, create a possible "wish list" of park
features and elements for further exploration. This list would
not necessarily be contingent upon available funding. Instead,
the list would consist of features that the Commission has
deemed important to include which, in their opinion, would best
meet the current and future needs of Moorpark.
4) Invite community residents, including representatives
from neighborhoods, community groups, and sports groups to a
future Commission meeting, to provide input as to perceived
recreational and leisure needs in Moorpark.
5) Take the "wish list" developed by staff and compare it
to the feedback provided by the community, and develop a merged
list of features for consideration. Some items or features may
drop off the list at this point in the process for lack of
support by the Commission and /or the public.
6) Staff will identify approximate costs of those
features still on the list, and provide this information to the
Commission. Staff will also endeavor to project anticipated
revenue for the Park Improvement Fund for community park
purposes to be received from anticipated development.
7) Utilizing the merged list with approximate costs, the
Commission will prepare a final recommendation of Phase II
improvements for the City Council to consider and prioritize.
The Commission should address how funding should be allocated,
based on an established priority list. For example, if the City
were to receive $200,000, should these funds be spent on a lower
priority item that is within that dollar amount, or saved for a
higher priority item, that will cost more?
Part of this step would be to also consider phasing the
construction of various elements, depending on available
0JUIL10
funding. Interim improvements should also be considered at this
point.
8) Upon development of a final priority list, the City
Council may consider contracting with a landscape architect to
develop a new conceptual design for the undeveloped 30 acres of
the park, and /or a design for the additional improvements in
Phase I, depending on the outcome of the public meetings and the
prioritized list of improvements.
Direct staff and Parks and Recreation Commission to: 1) Proceed
with process to develop revised Master Plan as outlined in the
report and 2) Specify items that should be deleted from the 1988
plan and /or consider for inclusion in recommendation for revised
Master Plan and whether interim and commercial recreation uses
should be considered.
Community Park Master Plan, prepared by BSI Consultants, Inc.,
1988.
Agenda Report to Approve Master Plan, March, 1990.
COMMUNITY PARR
MASTER PLAN REPORT
Table of Contents
1. Community Park Master Plan
Introduction
Master Plan
2• Estimated Construction Cost
General Development Cost by Area
Itemized Development Cost by Area
Selected Unit Cost
3. Development Phasing Plan
Phasing Premise
Cost by Phase
4• Project Funding Sources
5. Maintenance and Operations Projections
6• Park Lighting and Noise Impact Considerations
oto ,Z
ITEMIZED DEVELOPMENT COST BY AREA
AREA A
COMMUNITY CENTER
• Center Gym $4,089,400
• Pool Complex 419,550
Entry Sign 10,000
Maintenance Building 80,000
Tot -Lot 70,000
• General Landscape Development 275,698
(turf, trees, irrigation, picnic tables, walkways, etc.)
• Hard Court Area 342,700
(tennis, racquetball, basketball, and related amenities)
• Roadway 76,856
Utilities 30,000
• Parking Lots "A" and "B" 280,000
Area Lighting 50,000
Slope Landscaping 97,080
SUBTOTAL $5,821,284
15% CONTINGENCY 873,192
ESTIMATED CONSTRUCTION COST $6,694,476
* See Selected Unit Cost for further breakdown
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
-3-
AREA B
SPORTS FIELD
* Regulation Soccer Fields $ 748,500
* 1 Soccer /Field Hockey Field 315,000
(for Astroturf Field add $800,000)
* 4 Softball Diamonds 1,120,000
Restroom /Concession /Scorer's Office Building 175,000
Central Hardscape Development 105,000
Tot -Lot 75,000
* General Landscape Improvements 788,550
(turf, trees, irrigation, picnic tables, walkways, etc.)
* Roadway 118,270
Utilities 50,000
* Parking Lots "C" and "D" 252,500
Area Lighting 120,000
Slope Landscaping 43,080
SUBTOTAL $3,910,900
15% CONTINGENCY 586,635
TOTAL $4,497,535
* See Selected Unit Cost for further breakdown.
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
AREA C
PASSIVE PICNIC GROUNDS
Picnic Pavilions
(table, barbecues, sinks, lights, etc.)
Lake (3 acres)
Tot -Lot
$ 135,000
120,000
75,000
* General Landscaping Development 1,345,430
(turf, trees, irrigation, picnic tables, walkways, etc.)
Restroom /Storage Building 80,000
Area Lighting 100,000
Utilities
Slope Landscaping
SUBTOTAL
15% CONTINGENCY
TOTAL
* See Selected Unit Cost for further breakdown.
30,000
142,848
$2,028,278
304,241
$2,332,519
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
-5- ou
AREA D
EDISON EASEMENT
General Landscaping Development $2,195,550
(turf, trees, irrigation, picnic tables, walkways, etc.)
Area Lighting
Slope Landscaping
SUBTOTAL
15% CONTINGENCY
TOTAL
100,000
78,120
$2,373,670
356,050
$2,729,720
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
afl
0001 . a
SELECTED UNIT COST
POOL COMPLEX (AREA A)
Olympic Pool
1
LS
200,000
$ 200,000
Wade Pool
1
LS
50,000
50,000
Hardscape
27,500
SF
3
82,500
Fence (Wrought Iron)
875
LF
30
26,250
Planting
1
LS
5,000
5,000
Outdoor Lighting
1
LS
50,000
50,000
Drinking Fountain
1
EA
1,800
1,800
Trash Receptacle
1
EA
400
400
Benches
2
EA
500
1,000
Bleachers
1
EA
2,600
2,600
TOTAL
$ 419,550
CENTER /GYM (AREA A)
Community Center Building 1
LS
4,000,000
$4,000,000
Drinking Fountains
3
EA
1,800
5,400
Front Entry Hardscape
19,400
SF
3
58,200
Entry Planting
1
LS
22,000
22,000
Trash Receptacles
4
EA
400
1,600
Bike Rack
2
EA
1,100
2,200
TOTAL
$4,089,400
GENERAL LANDSCAPE DEVELOPMENT
Area A
131,285
SF
2.1
$ 275,698
Area B
375,500
SF
2.1
788,550
Area C
672,715
SF
2.1
1,412,701
Area D
1,045,500
SF
2.1
2,195,550
TOTAL $4,672,499
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
-7- wou?
HARDCOURT AREA (AREA A
Bleachers
2
EA
2,600
$ 5,200
Tennis Courts
3
EA
40,000
120,000
Tennis Court Lighting
1
LS
40,000
40,000
Basketball Courts
3
EA
30,000
90,000
Basketball Court Lighting
1
LS
40,000
40,000
Handball Court
1
EA
30,000
30,000
Handball Court Lighting
1
LS
15,000
15,000
Benches
5
EA
500
2,500
TOTAL $ 342,700
BASEBALL FIELD (AREA B)
Lighting
1
LS
120,000
120,000
Brick Dust (311)
1,600
SF
1
1,600
Dugout Construction
2
EA
3,200
6,400
Dugout Benches
4
EA
200
800.
30' Backstop
1
EA
12,000
12,000
Turf with Irrigation
67,000
SF
2
134,000
Bleachers
2
EA
2,600
5,200
TOTAL
$ 280,000
SOCCER FIELD (AREA B)
Turf with Irrigation
60,000
SF
2
$ 120,000
Goal Poles
2
EA
1,500
3,000
Lighting
1
LS
126,500
126,500
TOTAL
$ 249,500
TOURNAMENT SOCCER /HOCKEY FIELD (AREA B
Turf w /Irrigation 70,000 SF 2 $ 140,000
Goal Poles 2 EA 3,500 7,000
Lighting 1 LS 160,000 160,000
Bleachers 2 EA 4,000 8,000
TOTAL $ 315,000
ROADWAY - ENTIRE LENGTH
Community Center
Curb and Gutter 2,250 LF 12 $ 27,000
Asphalt Concrete 810 TN 40 32,400
Aggregate Base 1,091 TN 16 17,456
TOTAL $ 76,856
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
-8- 000115
Sports Area and Remainder
Curb and Gutter 3,500 LF 12 $ 42,000
Asphalt Concrete 1,260 TN 40 50,400
Aggregate Base 1,617 TN 16 25,872
TOTAL $ 118,272
PARKING LOTS
A
60,000
SF
2.5
$
150,000
B
52,000
SF
2.5
130,000
C
27,000
SF
2.5
68,000
D
74,000
SF
2.5
185,000
TOTAL
$
533,000
SLOPE PLANTING AND
IRRIGATION
Area A
80,900
SF
1.20
$
97,080
Area B
35,900
SF
1.20
43,080
Area C
119,040
SF
1.2
142,840
Area D
65,100
SF
1.2
78,120
TOTAL $ 361,120
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
DEVELOPMENT PHASING PLAN
PHASING PREMISE
Eight phases of development have been identified for constructing
the community park. Many factors have been considered in t
development of this plan, some of which include the strategy
develop from west to east to allow logical extension of u he
and to allow the potential for continued income from the e st to
farm lease. utilities
xiing
The first phase will allow for development of ten acres of a
surrounding and over the site of the future community center and
P001 complex. park
P The next two phases will result in full
development of the active sports fields. fourth be development of the passive park area on t he astern endsof the
park.
the
Subsequent phases will include the communit
complex, development of the Edison right of wa enter and pool
development of the slope along the south of they and finally
key elements and the associated Property. The
described in the following hasing
g pages. costs are further
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9 /gg
-10- 0001.23)
PHASE
t•u •c.•um
PH
CITY OF MOORPARK r r.
r � „ CONSULTANTS.INC.
��
PHASE PLAN
COMMUNITY PARK _
c
c
r�
PHASING PLAN
Phase I - open Turf and Trees Over Future Community Center Area
Area Lighting
Park Sign
Roadway /Utilities
Parking Lot "A" (1/2 developed)
Restroom (future maintenance building)
Tot -Lot (relocated in ulitmate development)
Park Landscaping (including future building pad & pool
areas)
Pathways (pedestrian /bike /emergency)
Phase I Estimated Construction Cost $1,200,000
Phase II - Ballfields Open Turf and Picnic Area
2 Ballfields
Open Turf Area
Picnic Tables
Parking Lots "B" and "C"
Park Landscaping
Roadway /Utilities
Sports Center Building with Restroom /Concession
Path Area
Tot -Lot
Pathways (pedestrian /bike /emergency)
Area Lighting
Phase II Estimated Construction Cost $3,200,000
Phase III - Additional Ballfields & Overflow Area
2 Ball Diamonds
Soccer /Field Hockey Field
Overflow Active Area
Picnic Tables
Pathways (pedestrian /bike /emergency)
Parking Lot "D"
Restroom /Storage
Park Landscaping
Area Lighting
Phase III Estimated Construction Cost $2,100,000
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88
-11-
Phase IV - Passive Park Area
Picnic Pavilions
Picnic Tables
Lake
Play Area
Pathways (pedestrian /bike /emergency)
OpenTurf
Area Lighting
Phase IV Estimated Construction Cost $1,600,000
Phase V - Community Building
Center /Gymnasium Building
Paths, Entry Paving and Related Improvements
Parking Lot "A" (1/2 developed)
Basketball
Tennis
Handball
Maintenance Building Conversion
Area Lighting
Phase V Estimated Construction Cost $5,300,000
Phase VI - Pool Complex
Swimming Pools
Surrounding Path
Related Amenities
Phase VI Estimated Construction Cost $ 500,000
Phase VII - Edison Right of Way
Parking Area
Picnic Tables
Pathways
Park Landscaping
Area Lighting
Phase VII Estimated Construction Cost $2,650,000
Phase VIII - Slope
Slope Planting and Irrigation
Phase VIII Estimated Construction Cost $ 450,000
BSI CONSULTANTS, INC., Moorpark Community Park Master Plan 9/88