Loading...
HomeMy WebLinkAboutAGENDA REPORT 1994 0216 CC REG ITEM 08H 11 ITEM., . HRFK, CALIFORN A yCoun IIM3efng AGENDA RE PORT , CTTY OF MOORPARK Cf , 199 ACRO ///! TO: The Honorable City Council - 7 FROM: Kenneth C. Gilbert, Director of Public Works Ly w DATE: February 8, 1994 (Council Meeting 2-16-94) SUBJECT: Consider Bids for the Construction of Asphalt Improvements on Lassen Avenue and at the South MetroLink Parking Lot Driveway OVERVIEW The subject project provides for the construction of asphalt pavement to improve surface drainage in the Lassen alley south of Cornett and McFadden Avenue and to widen the MetroLink driveway on Moorpark Avenue. DISCUSSION A. Description of Projects The contract documents include two separate projects briefly described as follows: Project A: Lassen Alley -- Construction of pavement improvements in the Lassen alley south of Cornett and McFadden Avenue in order to improve the surface drainage in this area. The City recently completed the construction of storm drains to serve the Mission Bell Plaza and surrounding properties. One branch of that system extended to the Lassen alley. That leg of the system was funded 50% by AD92-1 assessments and 50% by a portion of a City payment to the AD92-1 Construction Fund from the L. A. AOC. The improvement plans for that project did not include surface pavement improvements in the Lassen Alley required to provide positive surface drainage to those storm drain inlets. Efforts to negotiate a Change Order with the contractor for that project, were unsuccessful. This work was, therefore, put out to bid as a separate project. Project B: MetroLink Driveway Widening -- Construction of additional pavement width for the South MetroLink parking lot driveway on Moorpark Avenue. Vehicles exiting this driveway turn both left and right. One egress lane has proven to be inadequate for this traffic pattern. The subject project provides for the widening of the driveway to allow for both left-turn and a right-turn exit lanes by creating a dedicated right turn lane. lasn_aw Lassen / MetroLink Pavement February 1994 Page 2 B. Bid Schedules The bidding documents provide two bid schedules to allow the City Council to select between two levels of effort. Schedule I includes all of the work required to construct the Lassen Alley pavement improvements. Schedule II includes all of the work required to widen the MetroLink driveway. The City may award a contract for either Schedule I or for Schedules I & II. C. Add Alternate The plans for the widening of the MetroLink driveway call for the portion of the driveway to be widened to be one hundred thirty feet (130' ) long. This area will accommodate approximately six (6) vehicles. The bidding documents include a Bid Alternate which increases the length of the area to be widened to two hundred fifty feet (250' ) , a length which will accommodate approximately twelve (12) vehicles. With this option there are now three levels of effort for the City Council to consider, summarized as follows: Schedule I: Lassen Alley Schedules I & II: Lassen Alley + MetroLink Driveway (130' ) Schedules I & IIA: Lassen Alley + MetroLink Driveway (250' ) D. Bid Results Attached as Exhibit 1 is a summary of all of the bids received. The apparent low bidders, depending on the Alternate selected, are listed as follows: Scope of Work Bidder Amount ($1 Schedule I Only: Lassen Alley R & H Paving, Inc. 18,251.00 Improvements Schedules I & II: Lassen Alley CNN Paving 23,137.00 plus MetroLink driveway widening of 130'. Schedules I & IIA: Lassen CNN Paving 24,931.00 Alley plus MetroLink driveway widening of 250'. lasn_aW ♦ 1 Lassen / MetroLink Pavement February 1994 Page 3 E. Fiscal Impact 1. Total Project Cost Estimate: The total project cost estimate for both Schedule I and Schedules I & II are listed as follows: Schedule I Sch II Schedule Sch II A Schedule Element Only 130' Long I & II 250' Long I & IIA Design 200 0 200 0 200 Construction 18,251 4,296 a) 23,137 6,090 b) 24,931 Contract Construction 2,100 0 2,100 0 2,100 Surveying Soils Testing 800 0 800 0 800 Inspection 2,300 800 3,100 1,000 3,300 Contract 2,000 0 2,000 0 2,000 Administration Contingency 1,859 504 2,363 610 2,469 Total 27,510 5,600 33,700 7,700 35,800 Notes: a) [Schedule I: $18,841] + [Schedule II: $4,296] = $23,137 b) [Schedule I: $18,841] + [Schedule IIA: $6,090] _ $24,931 2 . Project Funding: a. Lassen Alley Improvements: As stated above the storm drain serving this area was funded by AD92-1. Fifty percent (50%) of the cost of the Lassen storm Drain was funded by district assessments and fifty percent (50%) of those cost were funded by a portion of the City's L. A. Ave. AOC payment to the AD92-1 Construction Fund. It is recommended that the cost of the Lassen Alley surface improvements be funded in the same manner. If approved, the final accounting of district costs to be performed by the Assessment Engineer, will show this distribution of cost for this project. lasn_aw Lassen / MetroLink Pavement February 1994 Page 4 b. MetroLink Driveway: It is recommended that a new project be identified for the proposed MetroLink driveway improvements to be funded in the same manner as prior MetroLink improvements, from the Local Transportation Fund (Fund 12) . RECOMMENDED ACTION (Roll Call Vote) Staff recommends that the City Council take the following actions: 1) Approve the Scope of Work to include the work described in Schedules I & IIA: Lassen Alley Improvements plus the widening of the MetroLink South Parking Lot Driveway for a length of approximately (two hundred fifty feet (250' ) ; 2) Approve project funding for the Lassen Alley improvements to be from the Assessment District 92-1 Construction Fund; 3) Approve an appropriation of funds and a budget amendment (#12- 151-903-0329) in the amount of $7,700 for the widening of the MetroLink South parking lot driveway; 4) Award a contract for the subject construction to CNM Paving, Inc. for the bid amount of $24,931; 5) Approve a ten per cent contingency for the project; and, 6) Authorize the Mayor to sign necessary contract documents. lasnaw • CITY OF MOORPARK Bidder VENDOR 1 VENDOR 2 VENDOR 3 VENDOR 4 Bid Results NAME: CNM Paving [#449] R & H Paving S & H Construction Chaparral Lassen Alley & ADDRESS: Engineer's Estimate 2150-G Las Posas Rd 1497 Los Angeles Ave P. 0. Box 183 5625 Vineyard Ave. MetroLink Driveway CITY, STATE: Camarillo, CA 93101 Saticoy, CA 93004 Oak VIew, CA 93022 Oxnard, CA 93030 Asphalt Improvements PHONE NUMBER: (805) 389-1475 (805) 647-3286 (805) 646-9078 (805) 647-8606 CONTACT PERSON: Matt Ludlow Bob Leslie Steve Harbison Jess Castillo ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID Schedule I 1 3" A/C + 4" Base 10,200 SF 2.50 25,500.00 1.56 15,912.00 1.50 15,300.00 1.81 18,462.00 2.07 21,114.00 2 3" A/C driveway 130 SF 2.00 260.00 2.00 260.00 5.00 650.00 1.81 235.30 1.23 159.90 3 6" A/C Berm 460 LF 6.00 2,760.00 5.80 2,668.00 5.00 2,300.00 5.00 2,300.00 3.61 1,660.60 4 Release 1 LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Schedule I 28,521.00 18,841.00 18,251.00 20,998.30 22,935.50 Schedule II 1 3" A/C + 4" Base 1,300 SF 3.50 4,550.00 2.00 2,600.00 3.90 5,070.00 5.38 6,994.00 2.49 3,237.00 2 6" A/C Berm 120 LF 6.00 720.00 5.80 696.00 5.00 600.00 5.00 600.00 3.61 433.20 3 Relocate Signs 1 LS 1,800.00 1,800.00 1,000.00 1,000.00 2,000.00 2,000.00 800.00 800.00 1,585.00 1,585.00 Total Schedule II 7,070.00 4,296.00 7,670.00 8,394.00 5,255.20 Schedule IIA 1 3" A/C + 4" Base 2,600 SF 3.00 7,800.00 1.56 4,056.00 2.80 7,280.00 3.00 7,800.00 2.35 6,110.00 11. 2 6" A/C Berm 230 LF 5.00 1,150.00 5.80 1,334.00 5.00 1,150.00 5.00 1,150.00 3.61 830.30 yC 3 Relocate Signs 1 ' LS 1,800.00 1,800.00 700.00 700.00 2,000.00 2,000.00 800.00800.00 1,745.00 1,745.00 = 03 Total Schedule IIA 10,750.00 6,090.00 10,430.00 9,750.00 8,685.30 Total I + II 35,591.00 23,137.00 25,921.00 29,392.30 28,190.70 Total I + IIA 39,271.00 24,931.00 28,681.00 30,748.30 31,620.80 r\ A Io `/ CITY OF MOORPARK Bidder VENDOR 5 VENDOR 6 VENDOR 7 VENDOR 8 VENDOR 9 Bid Results NAME: Berry Gen Eng ANM Construction Tricon Constr S P Milling Granite Constr Lassen Alley & ADDRESS: P. O. Box 7178 P. 0. Box 1608 1230 Coast Village Cir 3555 Vineyard Ave 585 W Beach St. MetroLink Driveway CITY, STATE: Oxnard, CA 93031 Palmdale, CA 93550 Santa Barbra, A 93108 Oxnard, CA 93030 Watsonville, CA 95077 Asphalt Improvements PHONE NUMBER: (805) 485-9826 (805) 267-6254 (805) 565-5677 (805) 485-3101 (408) 724-1011 CONTACT PERSON: Dan Berry Abraham Martinez Bruce Burke Ron Pierson R. Allbritton ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID Schedule I 1 3" A/C + 4" Base 10,200 SF 1.82 18,564.00 2.00 20,400.00 2.50 25,500.00 2.00 20,400.00 2.10 21,420.00 2 3" A/C driveway 130 SF 1.00 130.00 3.25 422.50 3.00 390.00 1.40 182.00 1.35 175.50 3 6" A/C Berm 460 LF 3.30 1,518.00 8.90 4,094.00 4.00 1,840.00 3.80 1,748.00 2.65 1,219.00 4 Release 1 LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Schedule I 20,213.00 24,917.50 27,731.00 22,331.00 22,815.50 Schedule II 1 3" A/C + 4" Base 1,300 SF 4.00 5,200.00 3.20 4,160.00 2.00 2,600.00 5.20 6,760.00 6.05 7,865.00 2 6" A/C Berm 120 LF 5.70 684.00 10.00 1,200.00 4.00 480.00 9.80 1,176.00 6.55 786.00 3 Relocate Signs 1 LS 2,650.00 2,650.00 200.00 200.00 300.00 300.00 1,275.00 1,275.00 836.00 836.00 Total Schedule II 8,534.00 5,560.00 3,380.00 9,211.00 9,487.00 Schedule IIA 1 3" A/C + 4" Base 2,600 SF 3.30 8,580.00 2.20 5,720.00 1.60 4,160.00 3.40 8,840.00 4.58 11,908.00 2 6" A/C Berm 230 LF 4.50 1,035.00 8.75 2,012.50 4.00 920.00 5.80 1,334.00 3.50 805.00 ti) 3 Relocate Signs 1 LS 2,650.00 2,650.00 242.50 242.50 300.00 300.00 1,275.00 1,275.00 836.00 836.00 y co Total Schedule IIA 12,265.00 7,975.00 5,380.00 11,449.00 13,549.00 .- .41 Total I + II 28,747.00 30,477.50 31,111.00 31,542.00 32,302.50 Total I + IIA 32,478.00 32,892.50 33,111.00 33,780.00 36,364.50 n N 0 CITY OF MOORPARK Bidder VENDOR 10 Bid Results NAME: Gasek Construc Lassen Alley & ADDRESS: 20661 Keswick St MetroLink Driveway CITY, STATE: Canoga Park, CA 91306 Asphalt Improvements PHONE NUMBER: (818) 592-6588 CONTACT PERSON: Bahram Semnani ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID Schedule I 1 3" A/C + 4" Base 10,200 SF 3.11 31,722.00 2 3" A/C driveway 130 SF 5.00 650.00 3 6" A/C Berm 460 LF 10.00 4,600.00 4 Release 1 LS 1.00 1.00 Total Schedule I 36,973.00 Schedule II 1 3" A/C + 4" Base 1,300 SF 3.11 4,043.00 2 6" A/C Berm 120 LF 10.00 1,200.00 3 Relocate Signs 1 LS 357.00 357.00 Total Schedule II 5,600.00 Schedule IIA 1 3" A/C + 4" Base 2,600 SF 3.11 8,086.00 2 6" A/C Berm 230 LF 10.00 2,300.00 3 Relocate Signs 1 LS 119.00 119.00 Total Schedule IIA 10,505.00 Total I + II 42,573.00 Total I + IIA 47,478.00 W