TO: The Honorable City Council - 7
FROM: Kenneth C. Gilbert, Director of Public Works Ly w
DATE: February 8, 1994 (Council Meeting 2-16-94)
SUBJECT: Consider Bids for the Construction of Asphalt
Improvements on Lassen Avenue and at the South
MetroLink Parking Lot Driveway
OVERVIEW
The subject project provides for the construction of asphalt
pavement to improve surface drainage in the Lassen alley south of
Cornett and McFadden Avenue and to widen the MetroLink driveway on
Moorpark Avenue.
DISCUSSION
A. Description of Projects
The contract documents include two separate projects briefly
described as follows:
Project A: Lassen Alley -- Construction of pavement
improvements in the Lassen alley south of Cornett and McFadden
Avenue in order to improve the surface drainage in this area.
The City recently completed the construction of storm drains to
serve the Mission Bell Plaza and surrounding properties. One
branch of that system extended to the Lassen alley. That leg of
the system was funded 50% by AD92-1 assessments and 50% by a
portion of a City payment to the AD92-1 Construction Fund from
the L. A. AOC. The improvement plans for that project did not
include surface pavement improvements in the Lassen Alley
required to provide positive surface drainage to those storm
drain inlets. Efforts to negotiate a Change Order with the
contractor for that project, were unsuccessful. This work was,
therefore, put out to bid as a separate project.
Project B: MetroLink Driveway Widening -- Construction of
additional pavement width for the South MetroLink parking lot
driveway on Moorpark Avenue. Vehicles exiting this driveway
turn both left and right. One egress lane has proven to be
inadequate for this traffic pattern. The subject project
provides for the widening of the driveway to allow for both
left-turn and a right-turn exit lanes by creating a dedicated
right turn lane.
lasn_aw
Lassen / MetroLink Pavement
February 1994
Page 2
B. Bid Schedules
The bidding documents provide two bid schedules to allow the
City Council to select between two levels of effort. Schedule
I includes all of the work required to construct the Lassen
Alley pavement improvements. Schedule II includes all of the
work required to widen the MetroLink driveway. The City may
award a contract for either Schedule I or for Schedules I & II.
C. Add Alternate
The plans for the widening of the MetroLink driveway call for
the portion of the driveway to be widened to be one hundred
thirty feet (130' ) long. This area will accommodate
approximately six (6) vehicles. The bidding documents include
a Bid Alternate which increases the length of the area to be
widened to two hundred fifty feet (250' ) , a length which will
accommodate approximately twelve (12) vehicles. With this
option there are now three levels of effort for the City Council
to consider, summarized as follows:
Schedule I: Lassen Alley
Schedules I & II: Lassen Alley + MetroLink Driveway (130' )
Schedules I & IIA: Lassen Alley + MetroLink Driveway (250' )
D. Bid Results
Attached as Exhibit 1 is a summary of all of the bids received.
The apparent low bidders, depending on the Alternate selected,
are listed as follows:
Scope of Work Bidder Amount ($1
Schedule I Only: Lassen Alley R & H Paving, Inc. 18,251.00
Improvements
Schedules I & II: Lassen Alley CNN Paving 23,137.00
plus MetroLink driveway
widening of 130'.
Schedules I & IIA: Lassen CNN Paving 24,931.00
Alley plus MetroLink driveway
widening of 250'.
lasn_aW
♦ 1
Lassen / MetroLink Pavement
February 1994
Page 3
E. Fiscal Impact
1. Total Project Cost Estimate: The total project cost estimate
for both Schedule I and Schedules I & II are listed as
follows:
Schedule I Sch II Schedule Sch II A Schedule
Element Only 130' Long I & II 250' Long I & IIA
Design 200 0 200 0 200
Construction 18,251 4,296 a) 23,137 6,090 b) 24,931
Contract
Construction 2,100 0 2,100 0 2,100
Surveying
Soils Testing 800 0 800 0 800
Inspection 2,300 800 3,100 1,000 3,300
Contract 2,000 0 2,000 0 2,000
Administration
Contingency 1,859 504 2,363 610 2,469
Total 27,510 5,600 33,700 7,700 35,800
Notes:
a) [Schedule I: $18,841] + [Schedule II: $4,296] = $23,137
b) [Schedule I: $18,841] + [Schedule IIA: $6,090] _ $24,931
2 . Project Funding:
a. Lassen Alley Improvements: As stated above the storm
drain serving this area was funded by AD92-1. Fifty
percent (50%) of the cost of the Lassen storm Drain was
funded by district assessments and fifty percent (50%) of
those cost were funded by a portion of the City's L. A.
Ave. AOC payment to the AD92-1 Construction Fund. It is
recommended that the cost of the Lassen Alley surface
improvements be funded in the same manner. If approved,
the final accounting of district costs to be performed by
the Assessment Engineer, will show this distribution of
cost for this project.
lasn_aw
Lassen / MetroLink Pavement
February 1994
Page 4
b. MetroLink Driveway: It is recommended that a new project
be identified for the proposed MetroLink driveway
improvements to be funded in the same manner as prior
MetroLink improvements, from the Local Transportation Fund
(Fund 12) .
RECOMMENDED ACTION (Roll Call Vote)
Staff recommends that the City Council take the following actions:
1) Approve the Scope of Work to include the work described in
Schedules I & IIA: Lassen Alley Improvements plus the widening
of the MetroLink South Parking Lot Driveway for a length of
approximately (two hundred fifty feet (250' ) ;
2) Approve project funding for the Lassen Alley improvements to be
from the Assessment District 92-1 Construction Fund;
3) Approve an appropriation of funds and a budget amendment (#12-
151-903-0329) in the amount of $7,700 for the widening of the
MetroLink South parking lot driveway;
4) Award a contract for the subject construction to CNM Paving,
Inc. for the bid amount of $24,931;
5) Approve a ten per cent contingency for the project; and,
6) Authorize the Mayor to sign necessary contract documents.
lasnaw
•
CITY OF MOORPARK Bidder VENDOR 1 VENDOR 2 VENDOR 3 VENDOR 4
Bid Results
NAME: CNM Paving [#449] R & H Paving S & H Construction Chaparral
Lassen Alley & ADDRESS: Engineer's Estimate 2150-G Las Posas Rd 1497 Los Angeles Ave P. 0. Box 183 5625 Vineyard Ave.
MetroLink Driveway CITY, STATE: Camarillo, CA 93101 Saticoy, CA 93004 Oak VIew, CA 93022 Oxnard, CA 93030
Asphalt Improvements PHONE NUMBER: (805) 389-1475 (805) 647-3286 (805) 646-9078 (805) 647-8606
CONTACT PERSON: Matt Ludlow Bob Leslie Steve Harbison Jess Castillo
ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID
Schedule I
1 3" A/C + 4" Base 10,200 SF 2.50 25,500.00 1.56 15,912.00 1.50 15,300.00 1.81 18,462.00 2.07 21,114.00
2 3" A/C driveway 130 SF 2.00 260.00 2.00 260.00 5.00 650.00 1.81 235.30 1.23 159.90
3 6" A/C Berm 460 LF 6.00 2,760.00 5.80 2,668.00 5.00 2,300.00 5.00 2,300.00 3.61 1,660.60
4 Release 1 LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Schedule I 28,521.00 18,841.00 18,251.00 20,998.30 22,935.50
Schedule II
1 3" A/C + 4" Base 1,300 SF 3.50 4,550.00 2.00 2,600.00 3.90 5,070.00 5.38 6,994.00 2.49 3,237.00
2 6" A/C Berm 120 LF 6.00 720.00 5.80 696.00 5.00 600.00 5.00 600.00 3.61 433.20
3 Relocate Signs 1 LS 1,800.00 1,800.00 1,000.00 1,000.00 2,000.00 2,000.00 800.00 800.00 1,585.00 1,585.00
Total Schedule II 7,070.00 4,296.00 7,670.00 8,394.00 5,255.20
Schedule IIA
1 3" A/C + 4" Base 2,600 SF 3.00 7,800.00 1.56 4,056.00 2.80 7,280.00 3.00 7,800.00 2.35 6,110.00 11.
2 6" A/C Berm 230 LF 5.00 1,150.00 5.80 1,334.00 5.00 1,150.00 5.00 1,150.00 3.61 830.30 yC
3 Relocate Signs 1 ' LS 1,800.00 1,800.00 700.00 700.00 2,000.00 2,000.00 800.00800.00 1,745.00 1,745.00 =
03
Total Schedule IIA 10,750.00 6,090.00 10,430.00 9,750.00 8,685.30
Total I + II 35,591.00 23,137.00 25,921.00 29,392.30 28,190.70
Total I + IIA 39,271.00 24,931.00 28,681.00 30,748.30 31,620.80
r\
A
Io
`/
CITY OF MOORPARK Bidder VENDOR 5 VENDOR 6 VENDOR 7 VENDOR 8 VENDOR 9
Bid Results
NAME: Berry Gen Eng ANM Construction Tricon Constr S P Milling Granite Constr
Lassen Alley & ADDRESS: P. O. Box 7178 P. 0. Box 1608 1230 Coast Village Cir 3555 Vineyard Ave 585 W Beach St.
MetroLink Driveway CITY, STATE: Oxnard, CA 93031 Palmdale, CA 93550 Santa Barbra, A 93108 Oxnard, CA 93030 Watsonville, CA 95077
Asphalt Improvements PHONE NUMBER: (805) 485-9826 (805) 267-6254 (805) 565-5677 (805) 485-3101 (408) 724-1011
CONTACT PERSON: Dan Berry Abraham Martinez Bruce Burke Ron Pierson R. Allbritton
ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID
Schedule I
1 3" A/C + 4" Base 10,200 SF 1.82 18,564.00 2.00 20,400.00 2.50 25,500.00 2.00 20,400.00 2.10 21,420.00
2 3" A/C driveway 130 SF 1.00 130.00 3.25 422.50 3.00 390.00 1.40 182.00 1.35 175.50
3 6" A/C Berm 460 LF 3.30 1,518.00 8.90 4,094.00 4.00 1,840.00 3.80 1,748.00 2.65 1,219.00
4 Release 1 LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Schedule I 20,213.00 24,917.50 27,731.00 22,331.00 22,815.50
Schedule II
1 3" A/C + 4" Base 1,300 SF 4.00 5,200.00 3.20 4,160.00 2.00 2,600.00 5.20 6,760.00 6.05 7,865.00
2 6" A/C Berm 120 LF 5.70 684.00 10.00 1,200.00 4.00 480.00 9.80 1,176.00 6.55 786.00
3 Relocate Signs 1 LS 2,650.00 2,650.00 200.00 200.00 300.00 300.00 1,275.00 1,275.00 836.00 836.00
Total Schedule II 8,534.00 5,560.00 3,380.00 9,211.00 9,487.00
Schedule IIA
1 3" A/C + 4" Base 2,600 SF 3.30 8,580.00 2.20 5,720.00 1.60 4,160.00 3.40 8,840.00 4.58 11,908.00
2 6" A/C Berm 230 LF 4.50 1,035.00 8.75 2,012.50 4.00 920.00 5.80 1,334.00 3.50 805.00 ti)
3 Relocate Signs 1 LS 2,650.00 2,650.00 242.50 242.50 300.00 300.00 1,275.00 1,275.00 836.00 836.00 y
co
Total Schedule IIA 12,265.00 7,975.00 5,380.00 11,449.00 13,549.00 .-
.41
Total I + II 28,747.00 30,477.50 31,111.00 31,542.00 32,302.50
Total I + IIA 32,478.00 32,892.50 33,111.00 33,780.00 36,364.50
n
N
0
CITY OF MOORPARK Bidder VENDOR 10
Bid Results
NAME: Gasek Construc
Lassen Alley & ADDRESS: 20661 Keswick St
MetroLink Driveway CITY, STATE: Canoga Park, CA 91306
Asphalt Improvements PHONE NUMBER: (818) 592-6588
CONTACT PERSON: Bahram Semnani
ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID
Schedule I
1 3" A/C + 4" Base 10,200 SF 3.11 31,722.00
2 3" A/C driveway 130 SF 5.00 650.00
3 6" A/C Berm 460 LF 10.00 4,600.00
4 Release 1 LS 1.00 1.00
Total Schedule I 36,973.00
Schedule II
1 3" A/C + 4" Base 1,300 SF 3.11 4,043.00
2 6" A/C Berm 120 LF 10.00 1,200.00
3 Relocate Signs 1 LS 357.00 357.00
Total Schedule II 5,600.00
Schedule IIA
1 3" A/C + 4" Base 2,600 SF 3.11 8,086.00
2 6" A/C Berm 230 LF 10.00 2,300.00
3 Relocate Signs 1 LS 119.00 119.00
Total Schedule IIA 10,505.00
Total I + II 42,573.00
Total I + IIA 47,478.00
W