HomeMy WebLinkAboutAGENDA REPORT 1994 0406 CC REG ITEM 11D1,: ' ITEM/1'Z',
AGENDA REPORT J"nci)'
CITY OF MOORPARK
TO: The Honorable City Council
FROM: Jaime R. Aguilera, Director of Community Developmerce/
Kathleen Mallory, Associate Planner '
Date: March 31, 1994 (CC meeting of April 6, 1994)
SUBJECT: CONSIDER THE APPROPRIATION OF $19,508.50 TO DEMOLISH
(INCLUDING A 10 PERCENT CONTINGENCY) THE MAYFLOWER
MARKET LOCATED AT 105 HIGH STREET, DAMAGED DURING THE
JANUARY 17, 1994 EARTHQUAKE
BACKGROUND
Due to the earthquake and subsequent aftershocks, on January 17, 1994, an inspection
was made by the Department of Building and Safety of the City of Moorpark of the
Mayflower Market located at 105 High Street. Upon inspection it was determined that the
building was unsafe and therefore, a threat to !he ;public health, safety, and welfare.
The purpose of this staff report is to receive Council approval to appropriate $19,508.50
($1,000.00 for consultant management, $6,550.00 for demolition, $10,185 for asbestos
removal, and $1,773.50 as a contingency), which requires a roll call
vote, in order to demolish the aforementioned t�uilding
DISCUSSION
The inspection conducted on and after Januac y 17, 1994, revealed that the Mayflower
Market had been damaged and that it was a threat to the public health, safety, and
welfare. Therefore, the structure was declared to be a Dangerous Building, as
determined by Section 302.4, 302.7, and 302.9 nf the 1991 Uniform Building Code for the
Abatement of Dangerous Buildings.
According to the February 9, 1994 Notice and Order (see Attachment Number 1), the
City's building inspector requested that physical work be commenced in either the repair
or demolition of the unsafe buildings; this notice i equested action within seven days from
receipt of the February 9, 1994 correspondence phis deadline was extended by the
Director of Community Development upon discussions with the owner and the owner's
engineer regarding potential rE,construction of T-c- n iarket
KMP- 03- 31- 94(4:30am)A •,DEMCC4 -l-, RFo-
The Honorable City Council
March 31, 1994
Page 2
Demolition
Demolition of the building will cost $6,550.00. Additionally, asbestos has been identified
as being present within the building; therefore, an additional $10,185.00 would be needed
in order to remedy this problem (see Attachment Number 2).
Reimbursement
Based upon discussions with the Federal Emergency Management Agency (FEMA), staff
has been informed that the City would be eligible to receive reimbursement funding from
the State and /or Federal Government, for the demolition of "the project." The project is
considered by FEMA to include- the investigative report, staff time spent by the consultant
hired by the City (Phil Vein), asbestos removal, and demolition. The City hired consultant
(Phil Vein) has informed staff that his costs will not exceed $1,000.00. The City will not
be reimbursed 100 percent for the total cost of the project. According to information
received from FEMA and the State Office of Emergency Services (OES), the City can
expect to be reimbursed for 94 90 of the total cost of the project. The City can anticipate
at least partial FEMA /OES reimbursement for ''ity staff and contract building inspection
services.
A Consent to Enter, Waiver of Liability and Reimbursement Agreement is being prepared
and should be approved subject to final language approval by the City Attorney and City
Manager. The Agreement will provide the owner 60 days to reimburse the City, without
incurring an interest charge. The Agreement will provide for the owner to reimburse the
City for all of the cost not reimbursed by FEMA or OES (approximately 6% or $1,064.10
[10% of $17,735.001 if the contingency budget is riot utilized). Staff recommends that
reimbursement of City staff costs not be rer,uestec of the owner.
If the owner doesn't sign the Agreement by April 18, 1994, staff will proceed to perform
the work as authorized by the Uniform Building Code and seek full reimbursement,
including any staff costs not reimbursed by FEMNOES Upon receipt of the signed
Agreement, staff will proceed with the asbestos removal and demolition work.
KMP -03 -31 -94(4 30am)A ',DEMCC4 -5.RP ;
The Honorable City Council
March 31, 1994
Page 3
Bidding Procedure, see Attachment Number 2
City consultant, Phil Vein coordinated the rece of of bids for the cost of asbestos removal
and demolition of the building.
Bids were as follows:
Asbestos Removal
Ventura Asbestos Control (VAC) $10,185.00 ()
Demolition, excluding removal of the foundation
CNM Paving $14,800.00
All Contractors $ 6,550.00
Buildina Exoansion
After demolition of the market. the owner would like to reconstruct the market; the owner
and the owner's engineer have met with staff regarding the proposed market and the
addition of new retail space (see Attachment Number 3). Some of the commercial space
within the proposed market will be available for lease by other businesses.
Summary of Fees to be Appropriated and Requested from FEMA /OES:
City Hired Consultant
$
1,000.06
Asbestos Removal
$
9,850.00
Investigative Report
$
335.00
Demolition
$
6,550.OG
Contingency budget A10 ° of total)
1 773.50
Total to be requested:
$19,508.50
The cost for the investigative report is 5335.00 and the cost for the asbestos
removal is $9,850.00 =- $10,185.00. The investigative report has already been
completed.
KMP -03 -31 -94(4 30,1m)A,VDi.MCC4-6 RP-1
The Honorable City Council
March 31, 1994
Page 4
RECOMMENDATION - ROLL CALL VOTE
Appropriate $19,508.50 (including a 10 90 contingency) from the General Fund,
01.4.117.642, for the demolition of 105 High Street (Mayflower Market).
2. Authorize the City Manger to enter into a contract with All Contractors ($6,550.00)
for the demolition and VAC ($10,185.00) for asbestos removal (see Attachment
Number 2) and to approve a contingency not to exceed 10 percent of the total
cost of the project.
3. Approve the agreement with the owners of the Mayflower Market subject to final
language approved by the City Attorney and City Manager for the reimbursement
of the project and authorize the City Manager to sign on behalf of the City.
Attachments:
1. February 9, 1994 Notice and Order
2, Demolition and Asbestos cost estimate
3. Proposed building expansion
KMP- 03- 31- 94(4:3Qnm)A.',DEMCC4 -E'. R�'-
Name:
Address:
City, State, Zip:
APN:
MOORPARK
799 Moorpark Avenue Moorpark, California 93021 (805) 529.6864
ATTACHMENT NUMBER 1
NOTICE AND ORDER
Mustafa Hijaz
105 High Stree_
Moorpark, CA U021
512 -0- 092 -140
Dear Mr. /Mrs. Hi�a7
Dater 2/9/94
An inspection of the above referenced property was made on 1/17/94
by the Department of Building and Safety of the City of Moorpark. Preliminary and
subsequent inspections of the structure have revealed that significant damage has occurred as
a result of the recent earthquakes.
It is the opinion of this Department that the structure has been damaged and is an inherent
danger to the public right -of -way and /or occupants of this building. We, therefore, have
declared this structure to be a Dangerous Building as determined by Sec. 302.4, 302.7, and
302.9 of the 1991 Uniform Code for the Abatement of Dangerous Buildings.
The Department of Building and Safety requires that: this building be vacated, engineered
shoring be put in place to prevent further failure due to aftershocks, and temporary safety
fencing installed, As an option, the building must be demolished pursuant to Chapter 4
Sec.401(b)3, A &C.
Permits must be obtained and physical work commenced within seven calendar days from the
date of this Notice and Order. Should you desire an Administrative Hearing within the next
twenty -four hours to protest this Notice and Order, you may request such. Your protest must
be accompanied by a structural engineers analysis. All correspondence and permit
applications should be directed to our Building and Safety office at 111A Poindexter Ave.
The City of Moorpark may proceed to cause repairs or demolition of the above referenced
structure if work is not commenced within 7 days. The costs thereof will be charged against
the property or its owner as stated in Chapter 4, Sec 401(a)4 of the Uniform Code for the
Abatement of Dangerous Buildings.
PAUL W. LAWRASON JR. SCOTT MONTGOMERY PATRICK HUNTER BERNARDO M. PEREZ
Mayor Mayor Pro Tom Counalmember Counalmember
JOHN E. WOZ:
Counalmemt
NOTICE AND ORDER
Page 2
If you have any questions, please feel free to contact Steve Coffalejo at 529 -6864, Ext. 421,
8:30 - 10:30 a.m. , Tuesday and Thursday mornings
Claude Stewart
Building Official
cc: Jim Aguilera
Steve Kueny
Address File
f WR 22 '94 16 :02 805 -S23 -9072 ALL CONT. INC. P.11/3
PROPOSAL PAGE 1 OF 2 PAGES
ALL CONTRACTORS, INC.
4267 VENTAVO DWVE
MOOiWARK, CA 4'!021
8054M3 -W71
FAX 806 -623 -9072
STATE ucz22w
MrOaAL aIlaar=TO HgNe OAT[
CITY OF MOORPARK 805- 529 -6864 EXT. 217 2/16/94
1
sTaeir
FAX
799 MOORPARK AVE 805- 529 -8270
CRY, sTAta. VP OOM JW KUE I
MOORPARK CA 93021 MAYFLOWER MARKET
T'0MMaudE 1 x aneeT JOa AOMlaa
105 HIGH STREET
RAt^ wTe alerrft6Cp(T
we Propose to do the following within property lines:
DEMOLISH AND REMOVE BUILDING LEAVING LOT CLEAR OF DEBRIS AND ROUGH GRADED
TO THE EXISTING CONVIURS. !
�t
PRICE INCLUDES: ]DEMOLITION PERMITS, TRUCKING, DUMP FEES, REMOVAL ASBESTOS,
PEDESTRIAN PROTECTION CANOPY.
PRICE EXCLUDES: TESTING FOR ASBESffTAC H M E N T NUM
E R 2
BREAKDOWN OF WORK AND PRICES AS FOLLOWS:
DEMOLISH MARKET $ 6,400.00- , _ ,,,
CONCRETE REMOVAL 1,500.00
MEAT CASE 300.00
COOLER ON ROOF 150.00
;
NOTE: In s000rdance with State and Federal laws, an asbestos survey nmW be
perforaud In all structures and all asbestos ren+ovod, before defnolidon can
begin. ALL CONTRACTORS, INC. is not 0oense4 to perform this work.
Addffld"Iy, a 20 day notice roust be ]Duran to the Emirvnowntd Prote cOm
Agency and the Air Oudity Contrtal Ois dcL This notice Is required whether
1
Of not asbestos Is present In Ute structure.
THE YOLIJOWZM I9.riali8 ARE SPECIFICALLY EXCLUDED FROX THIS CONTRICT,
UNL888 INCLUDED ]ABOVE:
POWTS. BONDS, W.U. AOUTES. STFIMT USE OR PA OQ FEES �' E E V E
LOCATN3, PROTEC'T*A OAPPrA RaOC:ATPA OR FIEPAIR OF unUTM:e
JA RIPPIN4 aLASTYdO UWCUTTNG
!
FGMAL AND oe9OM& OF SUBMWACE OEM OR sa�MOVSAWTS Le; CAISSONS, ti� 4R 2 1994
MADE W-M^ F OUM 0VERa» FUR TYPE OF WWVTURE, ETC.
PLOAVA MLN3 OR FSAOVAL Of CESOPOOL/AEPTIC 9 na,%r10EFIGMM TAWS. POOLS
HAZARDOUS WASTFNUTERfu, CONTAMINATED WL HAN MMoFt RBA3V AL City of Moorpark
I ommunity Development Department
FINE GRADNG RiiNk*M OR HANDLING OF TOPSOL
i
EROpON OONTAOL, ORA1111QE DEVIC A MCM3 OR V dUUMS
BARRICADES. CANDPWA OR FE NOW
1
1: J
ALL CONTRACTORS, INC. IS NOT RESPONSIBLE FOR DAMAGE TO OR REPAIR OF
SIDEWALKS, CURBS, STREETS, SEWERS, UTILITIES OR PROPERTY LINE FENCING
+•
{
ON JOB SITE OR ADJACENT PROPERTIES.
i
n. rwytoarNMtinrarWand labor - oomplalainacaardrwa
r�WePropwl
whh above spedficavorw, to iw tarn of
TWENTY THOUSAND ONE HUNDRED FIFTY AND N01100 Donars ($20,150.00_)
PWn wt to ba rrrds as idiowa:
IN FULL UPON COMPLETION
At "* % M..eWiad M a w�wrd\a r.an� �atoi.� M aanM�}rara.w
14.
Ary &Sod- 4,AA- 6aaalOy. iarwrNUtl& wow&r.alaaar+ AUTHORIZED SIGNATURE
l
i
••-••• rev ~*rWrJ»..*. NOTE: This proposal may be withdrawn by
f
. tae. r. y. e...a■. a► N .0 ..wrM us if not accepted within 15 days.
*Te yN ea"W&O/N-0 w** --..My Warr*C —W-noa
.
Aooeplaaoe of Proposal -The above plo«, pedeoaeon. If work does not coaence within
and oondtkxwr an salAtaotoy and are hw*y acospMd one Wwa nave read 15 days of acceptance of the under-
i
l
Ow aaoord papa of vile propo&A you are aut oemd to do tlw work as paolfiad signed, this proposal say be subject
i
Paynwnt Me be made as ou*wd above. to a price review.
f
Date of ]Acceptance: Signature
�
s�
ran.
M►AR a? • 94 1 F:
Ventura Asbestos Control, Inc.
V.A.Co ENVIRONMENI'AI. CON'I'IZA(TOR • SAFI;IY & HIEALI'H
51,50 Goldman Ave. • Unit B Contractors Li # (i(;,'01(i (805) 523-8894
Dicxnl) ark, CA 93021 St. >rt,• C,•rt . A6.11 t t (805) 523 -7942
FAX (805) 523 -7318
March 21, 1994
Mr. Phil Vein
City Manager,
799 Moorpark
Moorpark, Ca.
Dear Phil:
City of Moorpark
Ave.
93021
PROJECT SITE Mayflower Market
105 High St., Moorpark, Ca.
PROJECT NUMBER: 1623
Ventura Asbestos Control is pleased to submit a proposal to provide all
labor, materials and equipment necessary for the removal of asbestos
containing materials at the above address.
1. SCOPE OF WORK:
Contractor will perform:
A. The removal of all acoustic spray -on material on the interior
ceilings, located in the front area of the market.
B. The removal of all asbestos containing roofing material
including capsheet, felts, mastic and roof penetration /flashings.
C. Isolation of work area using 4 -mil and 6 -mil poly sheeting.
D. Decontamination unit.
E. Negative air filtration system containment.
F. HEPA (High Efficiency Particulate Air) vacuum and encapsulate
areas where asbestos was removed.
G. Notification to appropriate regulatory agencies.
H. Disposal of asbestos waste to an E.P.A. approved landfill.
I. Provision of a-third party air testing company to perform on -site
final air clearance.
Owner responsible for:
A. Providing electricity and water necessary to perform all work.
B. Removing all movable items (furniture, equipment etc.) from
the work area.
MAR 2 5 1994
G ty Ot WorparK
A.II.E.R.A. Certified In Inspection & Alanagement Planning Commun ty Develoomert Department
I
2. REMOVAL PROCEDURES:
All work at the above address will be performed in accordance
with all Federal, State and Local laws and regulations that
pertain to asbestos removal and disposal, including 8 CCR 1529
(OSHA), 40 CFR 763 (AHERA), 40 CFR part 61 and 5208 (CAL /OSHA).
3. DISPOSAL:
All asbestos waste will be handled, transported and disposed of
as per Federal, State and Local regulations to an E.P.A. approved
landfill. Owner to obtain a generator's EPA I.D. number and a
hazardous waste tax account number for transportation and disposal
of the asbestos waste. The EPA I.D. number may be obtained from
The Environmental Protection Agency at (916)324 -1781 and the
hazardous waste tax account number may be obtained by calling
(916)739 -2582.
4. SCHEDULING AND NOTIFICATIONS:
Contractor will complete the project in 5 working days if there
are no unforseen interruptions. A period of 10 working days is
necessary after notice to procede, to submit the required
notifications to the appropriate regulatory agencies.
5. CONTRACT PRICE:
Nine thousand eight hundred fifty dollars $9,850.00
Payment due upon completion of project.
Note: This proposal may be withdrawn by us if not accepted c;
within 30 days.
Duane, thank you for allowing us to be of service. We look forward
to working with you on this project.
Sincerely Accepted by:
Date:
Sid Moreno
president, Ventura Ast4estos Control
ATTACHMENT NUMBER 3
6
o eve�a �
I �
GRCIS:�; L[7F 1501) SO. F T.
EXIST[NG BIJILD[NG 37M S0. Fr.
PROPErED WILDING &eo -n, F-1
PFD KINti '_FACES - 17
IZ�q' 7,
ClWNERI
MU STAF A M, HIJAZ
11'15 EAST HIGH STREET
bIOORPARV< C:A 93021
COSH 529 -1506
PREPARED BYI
L. S. KC7VACS, CIVIL ENGINEER
— —
796 MOORPARK AVENUE_
MIOORPARK CA 93021
(805) 529 -7300
PPLlP[T E -D INIPR11\ /Eh,1F I'dT
�lA%Y,FL ITV/ EF? NIARK'FT
:105 HIGH STREET, h1ClClRF'd�RH'
- --
a
? J 4 _ 6
B �A
`I
{
- - - - -�� -
'
I rcPAGL BUII- 011431
CL
pq
l c
-.
-
,1
PF'pF 1.17, E. 11
F'RLIFT] I U
- -J
;� {
6
o eve�a �
I �
GRCIS:�; L[7F 1501) SO. F T.
EXIST[NG BIJILD[NG 37M S0. Fr.
PROPErED WILDING &eo -n, F-1
PFD KINti '_FACES - 17
IZ�q' 7,
ClWNERI
MU STAF A M, HIJAZ
11'15 EAST HIGH STREET
bIOORPARV< C:A 93021
COSH 529 -1506
PREPARED BYI
L. S. KC7VACS, CIVIL ENGINEER
— —
796 MOORPARK AVENUE_
MIOORPARK CA 93021
(805) 529 -7300
PPLlP[T E -D INIPR11\ /Eh,1F I'dT
�lA%Y,FL ITV/ EF? NIARK'FT
:105 HIGH STREET, h1ClClRF'd�RH'