SUBJECT: Consider 1) Approval of Design Services for the Tierra 1/
Rejada Road Widening Project and 2) Certain Revisions to !V /'- '
the Agreement for Engineering Services with Willdan
Associates Relating Thereto
BACKGROUND
In March of 1991, the City retained the services of Charles Abbott
Associates to perform the duties of City Engineer. Coincidental
with that action, the City Council amended the Agreement with
Willdan Associates, appointing that firm to perform the duties of
City Engineer with respect to certain identified projects (see the
attached Exhibit "A" of the Agreement).
One of the projects to be performed by Willdan Associates is the
Tierra Rejada Widening Project. In an effort to save time and
money, the project design already prepared by Valcon Engineering is
being used as the basis for developing a final design package.
This effort would be carried out through the combined efforts of
Willdan Associates and Valcon Engineering working as their
subcontractor.
DISCUSSION
A. Project Scope
The proposed project provides for the realignment and
reconstruction of Tierra Rejada Road from a point approximately
six hundred feet west of Spring Road, easterly to Moorpark Road.
The scope of work is generally described as follows:
1. Included -- The project will includes the following:
• construction of a four -lane divided highway;
• construction of pavement width sufficient to allow for
Bike Lanes on both sides of the street [Note: This work
is to be funded by an SB -821 State Grant];
wp \rpt \wldn
PAUL W. LAWRASON JR. JOHN E. WOZNIAK SCOTT MONTGOMERY BERNARDO M. PEREZ ROY E. TALLEY JR.
Mayor Mayor Pro Tem Councilmember Councilmember Councilmember
Panted On Recycled Paper
Tierra Rejada Road Widening
Page 2
• relocation of all utilities by the utility company /
district in concert with the City's contract;
• construction of an unimproved (no raised curbs) median
east of Spring Rd.
• construction of a raised median (with curbs) west of
Spring Road including utility stub -outs;
• construction of Spring Road improvements sufficient to
allow for adequate transitions; and,
• construction of curb & gutter ( & possibly sidewalk) on the
north side of the Tierra Rejada Rd. west of Spring Rd.
(Embassy frontage).
2. Possible Additions -- The City is looking into the
possibility of adding to the Scope of Work the construction
of curb, gutter & sidewalk on the south side of Tierra Rejada
Road west of Spring Road.
3. Not Included -- The Watt Company, after initially
considering participation in the project, has rejected
funding construction of curb, gutter & sidewalk along the
frontage of their property [south side of Tierra Rejada Road
the entire length of the project].
B. Insurance Coverage
Valcon Engineering possesses insurance coverage for general
public liability and property damage in the amount of
$1,000,000. Their insurance coverage for professional liability
is limited to $500,000. It is proposed that the coverage for
this latter category of risk, as it pertains to the Tierra
Rejada Widening Project, be increased to a $1,000,000 through
purchase of a rider to their policy. The cost of such a rider
is estimated to be $3,832. The design fee for the subject
project will be increased by said amount to cover the cost of
this additional insurance coverage.
C. Design Cost
1. Cost to Date: The total mount of design related costs
incurred by the City to date are as follows:
• Willdan ( #W91 -04) $52,400
• CAA [Embassy reversion to acreage] $ 4,000
$56,400
wp \rpt \wldn
Tierra Rejada Road Widening
Page 3
2. Additional Design Effort:
• Tierra Rejada Road -- Attached as Exhibit "B" is an
outline of the additional design effort required for that
portion of the work on Tierra Rejada Road. The total cost
for this additional work is $66,363.
• Spring Road -- Attached as Exhibit "C" is an outline of
the additional design work required for the required
improvements on Spring Road. The total cost for this
additional work is $12,122 (if soils test and survey is
not required the cost will be only $9,978).
3. Total Design Cost: A re -cap of the total project design
costs are as follows:
D. Amendment
With the purchase of the above described insurance rider, the
amount of the insurance coverage retained by Valcon Engineering for
general public liability, property damage and professional
liability will be $1,000,000. The terms of the Agreement between
the City and Willdan Associates requires insurance coverage in the
amount of $2,000,000. The attached Amendment to said Agreement
(Exhibit "D ") provides for the reduction of the insurance
requirements for the Tierra Rejada Road Widening Project to the
$1,000,000 limit.
wp \rpt \wldn
Additional
Item
Prior Costs Costs
Total
56,400
56,400
Tierra Rejada Road
66,363
66,363
Spring Road
12,122
12,122
Additional Insurance
3,832
3,832
10% Contingency
8,232
8,232
Total
56,400 90,549
146,949
D. Amendment
With the purchase of the above described insurance rider, the
amount of the insurance coverage retained by Valcon Engineering for
general public liability, property damage and professional
liability will be $1,000,000. The terms of the Agreement between
the City and Willdan Associates requires insurance coverage in the
amount of $2,000,000. The attached Amendment to said Agreement
(Exhibit "D ") provides for the reduction of the insurance
requirements for the Tierra Rejada Road Widening Project to the
$1,000,000 limit.
wp \rpt \wldn
Tierra Rejada Road Widening
Page 4
RECOMMENDATION
Staff recommends that the City Council take the following actions:
1. Approve the attached Amendment to the Agreement for Engineering
Services (Willdan) revising the insurance requirements for the
subject project.
2. Approve an increase in the design fee in an amount Not To Exceed
$100,000 for the design services required to complete the design
for the subject project.
3. Authorize the City Manager to approve all actions and authorize
specific items of work related to the design of said project.
wp \rpt \wldn
EXHIBIT "A"
1. South Meadows park Constructions Observation
2. Avenida Colonia - Nogales Construction Administration
and Observation
3. Tierra Rejada Road Widening - Final Design and
Preparation of Plans and Specifications
4. Spring Road - Peach Hill Road Street and Signal Redesign
5. Tract 4338 (UWC) Pressure Grouting Work and Construction
Observation
6. Grading Plan Review and Right -of -Way Deed Preparation
for 14303 East Los Angeles Avenue (Villanueva)
7. Tract 4081 (Colorer) Construction Observation
8. Tracts 3963 -1, -2, -3 (Griffin) Construction Observation
9. Tracts 3019 and 3525 (Warmington) Project Acceptance
10. CPD 90 -2 (UWC Commercial Project) Plan Review
11. IPD 90 -15 (Litton) Preliminary Project Review
12. IPD 90 -7, -8, -9, -10, -11, -12, -13 (West America)
Project Coordination
13. Los Angeles Avenue Paveout AOC Reimbursement
Coordination
14. Tract 4637 (UWC Town-home Project) Plan and Map Check
15. PM 4318 (Falke) Project Acceptance
16. Arroyo Vista Park Access Road - Legal Description Review
17. Final Paveout on Tierra Rejada Road for Tract 2865
(Pardee)
18. IPD 90 -1 (MVS Hotel) and RPD 90 -1 (MVS Apartments)
Preliminary Project Review
91
WILLDAN ASSOCIATES El . INEf: =2S &
December 15, 1992
Steve Kueny, City Manager
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93021
Subject: Tierra Rejada Road Widening
Dear Steve:
Enclosed is the work authorization to provide Public Works project administration services
for the Tierra Rejada Road Widening Project. We have also enclosed a breakdown of
Valcon's fee to final the plans.
Please be advised, in order to meet the April deadline for start of construction, we should
advertise for bids in mid to late January. Currently, there are several issues that need to
be undertaken with utility companies for construction of their facilities and coordination of
this project. In order to meet this deadline, it is imperative that we continue our work as
shown in the authorization. To date, we have expended approximately $4,600 of the
enclosed Extra Work Authorization for utility coordination and miscellaneous meetings just
to keep the project moving.
We will be submitting our design fees for preparation of plans for the Spring Road
transition widening under a separate cover within a couple of days.
Also enclosed is a letter from Valcon on obtaining $1 million in Professional Liability
insurance as opposed to the current limit of $500,000. The additional cost to provide this
insurance coverage is $1,032.
Di1PLEXFD
374 POLI STREET -SUITE 101 • `✓ENTURA CA: L:�OR'JIA?3001 26' (% )51 6 - =.�9' / (E ;' f ;''I 07 9'.
Steve Kueny
December 15, 1992
Page 2
Please do not hesitate to contact Mark Wittgraf or me with any questions or comments.
Very truly yours,
Enclosures
TS
copy: Mark Wittgraf, Construction Manager
Chuck Mink, Manager - Public Works Services
JFKMGW jg
06329/3001
FMO499.LTR
111IJ i
M
N
EXHIBIT "A"
T ERRA REJADA ROAD WIDENING PROJECT
PUBLIC WORK PROJECT' ADMINISTRATION
The following is an amended authorization pursuant to Authorization No. 91 -04
"Note No. 3 ". This authorization supercedes all work in Authorization No. 91 -04.
TOTAL COST
A. Project restart including one (1) meeting with City staff and
Valcon Associates and one (1) meeting with Valcon to
coordinate previous work compieted, status with current
requirements of project, and determine which alternatives
the City desires to incorporate into the final design. $675.00
B. Meeting with City staff; Ramseyer & Associates, and Valcon
to incorporate Science Drive intersection improvements,
discuss off -site disposal areas, and intersection
improvements at Spring Road, Science Drive and Moorpark
Road. Pursuant to this meeting, Valcon will revise the plans
to locate the Spring Road signal to ultimate location,
provide ultimate grade on the north side and prepare
revised disposal site plan from Ramseyer working drawings. $736.00
C. Coordinate with the five (5) original utility companies that
have facilities within the project. These utilities are as
follows:
1. Southern California Edison
2. Shell Pipeline Company
3. Camrosa Water District
4. Southern California Gas Company
5. Pacific Bell
Coordinate with new utility companies not originally
anticipated to have facilities within the project:
1. Ventura County Waterworks District No. 1
Coordination will include:
a. Request status of final relocation design,
material procurement, and scheduling of work
crews. This work is limited to one letter and
one follow -up phone call for each utility
company.
C'9
TQTAL COST
b. Determine if utilities can be removed from
service during construction of the road and the
new utility lines. This work is limited to one
meeting and one letter for each utility
company.
C. Include Camrosa waterline as an alternate bid
item in the project. Incorporate their plans
and specifications into the overall bid package.
d. Receive and review final utility relocation
plans.
e. Provide utility companies with project plans
for review of possible underground conflict.
Request documentation of utility company
satisfactory review. This work is limited to
one letter and one follow -up phone call per
utility company.
f. Conduct an on -site meeting with Edison to
coordinate proposed street light facilities.
Prepare Notice to Proceed letter for Edison to
begin design of street light electrical.
g. Coordinate utility companies to provide stub -
outs at future Science Drive for Carlsberg
project.
h. One (1) meeting with all utility company
representatives to coordinate all time
schedules for their work based on a. through f. $5,520.00
D. Provide additive alternative bids for complete road closure
and one -way traffic as follows:
1. Access from intersection of Tierra Rejada and Spring
Roads to the freeway from 7:00 am to 9:00 am.
2. Access from the freeway to the intersection of Tierra
Rejada and Spring Road from 4:00 pm to 6:00 pm.
Note: This alternate will provide access only at the
time intervals as shown. The roadway within project
limits will be closed at all other times, including
nights and weekends. This alternate would only
provide a dirt road with flagmen and traffic control
set up.
95
TOTAL COST
Prepare performance specification with specific
requirements for traffic control, safety and temporary road $2,208.00
material for the contractor to prepare plans to facilitate this
temporary closure. This plan would be submitted and
approved by the City prior to the commencement of
construction.
E. Review all current easement documents and reversion to
acreage for all properties along the project frontage to
ensure adequate construction easements and /or right -of -way
provided for the project.
F. Review Negative Declaration to ensure project meets all
requirements for environmental clearance. $368.00
G. Constructability review of revised construction plans, cross
sections and phasing plan with updated revisions for Science
Drive intersection, deletion of curb and gutter on the south
side, full median improvements, revised disposal site, and
Spring Road northeast comer paveout to ultimate width and
ultimate grading along the north side adjacent to Carlsberg. $3,168.00
H. Update current specification package bid schedule and
engineer's cost estimate (1989) since last estimate
incorporating all changes for D aLd G above. Check design
engineer's quantity estimate given latest revisions. Revise
entire specification to 1991 SSPWC with 1992 supplement. $2,320.00
I. Incorporate requirements of the Storm Water Pollution
Prevention Plan (SWPPP) into the bid documents. $736.00
J. Meeting with Design Engineer to review plan check
comments for items D through G. $368.00
K Meeting with City staff to present final bid pack=age and
obtain final approval. $368.00
I.. Prepare staff report to request "Advertise for Bids" and
attend Council meeting to answer any questions. $736.00
M. Prepare 25 sets of plans and specifications for distribution to
prospective bidders, set of instructions to counter persons at
the City, and plan holder's list for the City's use.
Distribute plans and specifications to the following plan
rooms:
3
B
TOTAL COST
1. F.W. Dodge
674 County Square Drive, #107
Ventura, CA 93003
2. Ventura County Plan Room
2630 Saddle Avenue, #101
Oxnard, CA 93030
3. Construction Market Data
142 Arena Street
El Segundo, CA 90245
4. Ventura County Contractors Association
Plan Room
1830 Lockwood, #110
Oxnard, CA 93030
5. F.W. Dodge
#2 Coral Circle
Monterey Park, CA 91754
6. The San Fernando Valley Construction Journal
28310 Roadside Drive, #137
Agoura Hills, CA 91301 *$440.00
*See note #2, page 5
N. Prepare scope of work for construction survey, soils
engineering and material testing. Distribute to three (3)
qualified firms (ea.) for soils and material testing only and
obtain proposals. We would propose Valcon Engineering
provide construction survey due to the complexity of the $ 1,472.00
project and the firm's prior envolvement. Review proposals
and make recommendations to the City for award of
contracts for these services.
O. Answer questions from prospective bidders during the 30-
day bid period. $1,472.00
P. Conduct prebid conference for attendance by all prospective
bidders. Review with all attendees the requirements of the
project and instructions on how to properly complete the bid
forms to ensure the City receives responsive bids from all
qualified contractors. $731.00
V
Valcon Fee $41,900
At the request of the City, Willdan agrees to employ Valcon Engineering, Inc., as a
subconsultant on this project. Willdan has expressed its concerns that said subconsultant
performed design work on the project as a consultant to a private developer and not under
the supervision or control of Willdan and that the documents prepared by Valcon
Engineering, Inc., have been provided by the City to Willdan to be used by Willdan in
connection with its services under this work order. The result is that a clear separation of
potential liability as between Willdan and Valcon Engineering, Inc., cannot be made. In
recognition of these circumstances; the City h,--s agreed to a limitation of Willdan's liability
on this project. For the purposes of the project covered by this work order, and this work
order only, the Agreement for Engineering Services between the City of Moorpark and
Willdan Associates dated March 3, 1992, is amended by adding the following paragraph at
the end of Section III.E.:
"Notwithstanding any provisions herein :o the contrary, for the purpose of that
certain project known as the "Tierra Rejada Road Widening Project ", the
liability of Willdan is limited to the lesser of: damages suffered by City which
are proximately caused by the negligent acts, errors or omissions of Willdan's
subconsultant, Valcon Engineering, Inc_, or the amount of $500,000.00."
This amendment applies only to this project a 3 shall not be applicable to any other project
performed under the Agreement for Engineer "Ilg Services. Except as provided in this work
order, all other provisions of the Agreement for Engineering Services shall remain in full
force and effect.
GRk D TOTAL PROJECT FEE $66,362
TOTAL COST
Q. Attend bid opening and assist City Clerk with administrative
duties during bid opening.
$552.00
R. Prepare bid spread sheet and analyze bids for irregularities
and other errors that would render aLv bids as non-
responsive. Conduct background reference checks and State
Board of Contractor's license verification for the lowest
bidder and prepare summary of findings from background
investigation in a memo to the City.
$1,296.00
Prepare staff report and Council item to recommend award
of contract for construction, soil engineering services,
construction surveying and material testing_
11,296.00
Grand Total Willdan Fee
$24,462.00
S. Valcon Engineer's fee per the attached proposal.
Valcon Fee $41,900
At the request of the City, Willdan agrees to employ Valcon Engineering, Inc., as a
subconsultant on this project. Willdan has expressed its concerns that said subconsultant
performed design work on the project as a consultant to a private developer and not under
the supervision or control of Willdan and that the documents prepared by Valcon
Engineering, Inc., have been provided by the City to Willdan to be used by Willdan in
connection with its services under this work order. The result is that a clear separation of
potential liability as between Willdan and Valcon Engineering, Inc., cannot be made. In
recognition of these circumstances; the City h,--s agreed to a limitation of Willdan's liability
on this project. For the purposes of the project covered by this work order, and this work
order only, the Agreement for Engineering Services between the City of Moorpark and
Willdan Associates dated March 3, 1992, is amended by adding the following paragraph at
the end of Section III.E.:
"Notwithstanding any provisions herein :o the contrary, for the purpose of that
certain project known as the "Tierra Rejada Road Widening Project ", the
liability of Willdan is limited to the lesser of: damages suffered by City which
are proximately caused by the negligent acts, errors or omissions of Willdan's
subconsultant, Valcon Engineering, Inc_, or the amount of $500,000.00."
This amendment applies only to this project a 3 shall not be applicable to any other project
performed under the Agreement for Engineer "Ilg Services. Except as provided in this work
order, all other provisions of the Agreement for Engineering Services shall remain in full
force and effect.
GRk D TOTAL PROJECT FEE $66,362
Notes:
We will submit a separate authorization at the award of contract for
construction management services based on construction detour alternatives
selected by the City.
2. All outside expenses for blueprinting, copying, site photos, etc., will be billed
as an extra cost.
3. A revised authorization amount may be necessary for extending the bid period
due to the City's or other utility company's delays to the project.
FM0498.WS
0
a
l "Yi
December 11, 1992
W.O. 50- 6178 -12
Willdan & Associates
I
374 Poli Street
Ventura, CA 93001
Attention: Mark Wittgraf
The Valcon Group
RE: TIERRA REJADA ROAD IMPROVEMENTS
Valcon, Inc.
Dear Mr. Wittgraf:
Vakoa /GIS,Inc.
Valcon Engineering, Inc.
The following list summarizes our breakdown of costs for re- designing and
drafting the Tierra Rejada Road plans:
Part I
1. L.L. &G. revisions to traffic signal plans per L.L. &G. invoice dated
9130/91 (not billed) ............................................. ...............................
$2,700
2. Valcon start up costs including:
• plans review
• conformance to latest Greenbook edition
• coordination meetings prior to revising plans
• reproduction costs prior to revising plans .... ...............................
1,850
Part II
1. Engineering cost to re- design plans for full median improvements
including drainage and cross sections ................. ...............................
6,480
2. Re- design N/E quadrant of Spring Road and Tierra Rejada
intersection to match General Plan width including design for
grading to fill in low spot on Carlsberg property. Re- design will
accommodate ultimate grading along north side, which will
primarily include moving concrete V ditch north of R/W line at fill
areas, and eliminate dirt access road at sta.57 +50 ......................
3,200
3. Design cost to delete curb and gutter on south side along Watt
property (sta.40 +00 to 73 +00) incuding drainage design and
73 Mood %court
plan revision .............................................................. ...............................
4,440
Thousand Oaks. CA 91360
19191889-8822 • (905) 4944.16.1
N% (805) 496•2318
Cad Ergs ee—z • Su,m is • (. 111'
921206
Willdan & Associates Page 2 &to
Re: Tierra Rejada Road Improvements
4. Engineering cost to prepare final quantity estimate. Due to the
re- design we feel that this estimate should be totally re -done
and checked. This includes curb and gutter, median, drainage
and pavement ........................................................... ............................... 2,000
5. Prepare earthwork volume calculations. The earthwork calcu-
lations will be totally re -done due to the re- design of such items
as: curb and gutter, median improvements, disposal site and
ultimate grading on the north side for Carlsberg property........... 4,900
6. Engineering cost to revise plans to accommodate new disposal
site........................................................................... .....................•......... 950
7. Engineering cost for coordinating with all utilities including
phasing of utilities, investigating conflicts, determining number
of move -ins including:
• review of each utility plan.
• verify horizontal location of each utility and revise Valcon's
composite utility plan as necessary.
• identify potential utility installation problems with respect to
detour phasing by overlaying acetate of detour plan on
utility plan.
• identify potential horizontal and vertical conflicts.
• present conflicts at one utility meeting arranged by Willdan.
• review revised utility plans after conflicts are presented.
• revise Valcon's final composite utility plan . ............................... 6,980
8. Engineering cost to re- design the traffic signal plans to
accommodate the ultimate improvements at the northeast
and northwest corner of Spring Road in accordance with the
new general plan and as directed by Willdan. Drawings will be
revisedby L. L.& G ................................................... ............................... 4,000
9. Process Moorpark Road South improvement plans to obtain
County permit (does not include processing detour plan) ........... 1,200
10. Prepare design for curb, gutter and sidewalk along north side
of Tierra Rejada Road from Spring Road westerly to the
existing curb and gutter (approximately 500 feet). We
anticipate the existing A.C. pavement will be severely damaged
due to utility construction in this area; therefore, Valcon will
design this section of pavement to acommodate an overlay..... 2,700
11. Soils engineering plan review and signatures ... ............................... 500
921206
Willdan & Associates
Re: Tierra Rejada Road Improvements
Page 3
12. Reproduction costs will be billed as reimbursables ....................... reimbursable
Total............... ............................... 41,900
(plus reproduction costs)
In order for Valcon to meet your tight time schedule we will need immediate
authorization to proceed. We also expect payment of our invoices within a
week after you are paid by the City. Let us know if there is any problem with
this arrangement.
Sincerely,
J. f
John F. Heck, III
Principal -in- Charge
u7•;�0C,
C -t
U �
WILLDAN ASSOCIATES ❑ -N6 NEEDS, & RJ-' .` . F--
f1foressiono! Const: ' ng I"f1 ices -�.nce 1964
December 16, 1992
Steve Kueny, City Manager
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93021
Subject: Spring Road Improvements
Dear Steve:
Enclosed is the work authorization to provide design services for the improvements on
Spring Road in conjunction with the Tierra Rejada Road Widening Project.. We have
included a sketch of our preliminary street alignment for your review. In the preliminary
design concept we have proposed an extension of the curb line adjacent to the Embassy
Project to tie into existing improvements at Christian Barnett Drive. Sidewalks can be easily
added within right -of -way; however, the original concept with the Embassy project was for
a meandering sidewalk. Street lights are not currently included within this project.
Pavement transitions along the east side of Spring Road will join the revised curb return on
Tierra Rejada Road and transition to provide the lane configuration shown on the
preliminary design concept plan. There appears to be a discrepancy in the lane
configurations called for in the Carlesberg Traffic Study; however, we have assumed that
study will eventually conform to the lane configurations shown. Utility stubouts onto the
Embassy parcel will be the responsibility of future development.
The design for Spring Road will be completed by mid January and incorporated into the
Tierra Rejada Road Widening Project.
It should be noted that the costs as proposed includes outside consulting costs of $2,400 for
surveying and $2,445 for soils testing. Both of these costs can be reduced substantially if
sufficient information is available in the City files for the Embassy project and for Tract
2865 -4, north of the Embassy project.
DUPLI7CP.D
374 POLI ST = -ET • SUITc 101 - VENI URA, CALIFORNIA `.,300' -2 6 ?? • (805) 653 -6597 • FAX (805) 643 ;791
Steve Kueny
December 16, 1992
Page 2
Please do not hesitate to call Chuck Mink or me with any questions or comments.
Very truly yours,
IATES
J
Vice President
Enclosures
copy: Charles S. Mink, Manager - Public Works Services
Mark Wittgr4 Construction Manager
JFK:CSM:Jg
06329/3002
FMO500.LTR
c -z
SENT BY:WILLDAN VENTURA ;12 -28-82 ; 2 :46PM WILLDAN VENTURA-0 85288270;# 2
C -3
9COS'!c Oir
TMCRm► F=AM AOsD WMINM SErtV CM
Design Sa yhn SD' SprtnB Road
The objective of this design task is to prepare construction plans of a section of Spring Road
for insertion into the Terra Rejada Road Widening Project The plan preparation will
incorporate information mined on the original mupproved and unsigned plans prepared
for the Embassy project. Field verification of the skis q topo and e*ting improvements,
Utility noti8cadoms6 and surM mitrols are necessary to prepare the required design.
Roomy deWM including street transitions, and drainage improvements will be
coordinated with the construction plans prepared for the TYerm Rejada Road NVidenW&
Proj"-
Spring Road a vements will include pavement transitions along the east side of Spring
Road. The intersection of Spring at Marra Rejada will inchrde one right turn lane and one
left -turn lane, a painted median, one northbound lase and a trand&ning of the pavement
from the curb return to the 30-fact wide pavement between Tierra Rejada and Christian
Barret Drive. The out side of Spring Road will be graded to provide for an 8 -foot shoulder
and a drainage swale. Pavement width will transition from the 78 feet required at Tierra
Rejada to join the existing pavement south of Christian Barret Drive (two lanes of traffic).
Drainage along the east side of the project wM be maintained in a graded earthen ditch.
A. Obtain preliminary design information to include approval of
preliminary design concept, data, field verification of MUtting
improvements. S 346
B. Prepare Plan and Profile sheets to include pavement des:IM
Odin& drainage, and utilities. $ 3,259
C. Prepare of traffic signing and striping plans, and traffic
control plan for phasing construction to provide two lames of
traffic during construction. $ 2,097
D. Coordinate and assimilate desgn plats into Valeon's bid package. L_
Subtotal: $ 9,978
E. Survey control, additional topo, And data verificsNon 3 Im
F. Soils tat for R Vahms $ 1,292
TOTAL, $12,122
DEC 29 '92 14:50 -- _ PAGE.002
is
A ILI,
.Q.0p F.
l
onq - CS��
ow
ii� 04,
GAN 01.
SPA k
hP s'
, is
AD
&IMI
AF
i5p
3)
December 16, 1992
Amendment to Agreement for City Engineering Services
At its regularly scheduled meeting of December 16, 1992, the
Moorpark City Council approved an amendment to the Agreement for
City Engineering Services with Willdan Associates, dated March 6,
1991.
All provisions and requirements of said Agreement shall remain in
full force and effect except as follows:
Section III G of the Agreement is amended to read:
" G. Consistent with the provisions of this Article, the
ENGINEER shall provide general public liability, property
damage and professional liability insurance in an amount
not less than Two Million Dollars ($2,000,000) per
occurrence and annual aggregate. The limits of insurance
coverage for general public liability, property damage and
professional liability for work related to the design and
other services for the Tierra Rejada Widening Project
shall be limited to One Million Dollars ($1,000,000).
John Knipe Paul W. Lawrason Jr.
Willdan Associates Mayor
Attest:
Lillian Hare,
City Clerk
wp\rpt`wldn
To: Steve Kueny, City Manager
From: Mark Wittgraf, Construction Manager A44 V✓
Date: December 30, 1992
Subject: TIERRA REJADA ROAD WIDENING PROJECT
MEDIAN COST ESTIMATE
RECEIVED
Mc 3 1 X992
i,Ic-
The following is the estimated additional construction cost to delete the temporary median
improvements as currently shown on the plans and provide full- raised median improvements
over the entire project length:
Item
No.
Description
Quantity
unit
Price
Total
Cost
To Be Added:
1.
6 -inch P.C.C. Curb
3,250 LF
$9.50
$30,875.00
2.
6 -inch P.C.C. Curb w /12 -inch gutter
3,250 LF
$12.00
$39,000.00
3.
Catch Basin, w = 7 feet
2 EA
$3,000.00
$6,000.00
Total Added
$75,875.00
To Be Deleted:
I.
5 -inch A.C. on 18 -inch Base
3 500 SF
$2.15
<$7,525.00>
2.
Median Ribbon Gutter
2,725 LF
$19.00
<$51,775.00>
Total Deleted
<$59,300.00>
Esd at >J Total Additional Cost for Raised Median Improvements
$16,575.00
copy: Ken Gilbert, Director of Public Works, City of Moorpark
John F. Knipe, Willdan Associates
NIC W:lc
06365/301
FM0502.NtHN4
or wo //C I u ��-
�Or
dirt C Cow:
ro n
ere c-
�Y� 262.05 CoNST C�+tc�F g�a
,�/»` /O
r`'
S • O. l- r�,2� --
. %coje e�i�r /rig . - - •
. , �
�±�— _ �� -'
� f ,. ' � ',
•:
R, ICI
� t/ • � r ! J
i
1�y � -ter - 1' -_
�N STis RL
J
r_
•l
57�j 53 t-2q 7/ /�sfo// /2
- -- - -
f�17, ���i�r
og0 �� ���s
c -5.'.
Pas ey
Gcr' Slzd.
C