Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0106 CC REG ITEM 08FMOORPAR TEMB F. 799 Moorpark Avenue Moorpark, California 93021 AGENDA REPORT TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works DATE: December 28, 1992 (Council Meeting 1 -6 -93) (805) 529 -6864 Council Moot;ng F•CTION:�� gy Y16. S 7 4=43� SUBJECT: Consider 1) Approval of Design Services for the Tierra 1/ Rejada Road Widening Project and 2) Certain Revisions to !V /'- ' the Agreement for Engineering Services with Willdan Associates Relating Thereto BACKGROUND In March of 1991, the City retained the services of Charles Abbott Associates to perform the duties of City Engineer. Coincidental with that action, the City Council amended the Agreement with Willdan Associates, appointing that firm to perform the duties of City Engineer with respect to certain identified projects (see the attached Exhibit "A" of the Agreement). One of the projects to be performed by Willdan Associates is the Tierra Rejada Widening Project. In an effort to save time and money, the project design already prepared by Valcon Engineering is being used as the basis for developing a final design package. This effort would be carried out through the combined efforts of Willdan Associates and Valcon Engineering working as their subcontractor. DISCUSSION A. Project Scope The proposed project provides for the realignment and reconstruction of Tierra Rejada Road from a point approximately six hundred feet west of Spring Road, easterly to Moorpark Road. The scope of work is generally described as follows: 1. Included -- The project will includes the following: • construction of a four -lane divided highway; • construction of pavement width sufficient to allow for Bike Lanes on both sides of the street [Note: This work is to be funded by an SB -821 State Grant]; wp \rpt \wldn PAUL W. LAWRASON JR. JOHN E. WOZNIAK SCOTT MONTGOMERY BERNARDO M. PEREZ ROY E. TALLEY JR. Mayor Mayor Pro Tem Councilmember Councilmember Councilmember Panted On Recycled Paper Tierra Rejada Road Widening Page 2 • relocation of all utilities by the utility company / district in concert with the City's contract; • construction of an unimproved (no raised curbs) median east of Spring Rd. • construction of a raised median (with curbs) west of Spring Road including utility stub -outs; • construction of Spring Road improvements sufficient to allow for adequate transitions; and, • construction of curb & gutter ( & possibly sidewalk) on the north side of the Tierra Rejada Rd. west of Spring Rd. (Embassy frontage). 2. Possible Additions -- The City is looking into the possibility of adding to the Scope of Work the construction of curb, gutter & sidewalk on the south side of Tierra Rejada Road west of Spring Road. 3. Not Included -- The Watt Company, after initially considering participation in the project, has rejected funding construction of curb, gutter & sidewalk along the frontage of their property [south side of Tierra Rejada Road the entire length of the project]. B. Insurance Coverage Valcon Engineering possesses insurance coverage for general public liability and property damage in the amount of $1,000,000. Their insurance coverage for professional liability is limited to $500,000. It is proposed that the coverage for this latter category of risk, as it pertains to the Tierra Rejada Widening Project, be increased to a $1,000,000 through purchase of a rider to their policy. The cost of such a rider is estimated to be $3,832. The design fee for the subject project will be increased by said amount to cover the cost of this additional insurance coverage. C. Design Cost 1. Cost to Date: The total mount of design related costs incurred by the City to date are as follows: • Willdan ( #W91 -04) $52,400 • CAA [Embassy reversion to acreage] $ 4,000 $56,400 wp \rpt \wldn Tierra Rejada Road Widening Page 3 2. Additional Design Effort: • Tierra Rejada Road -- Attached as Exhibit "B" is an outline of the additional design effort required for that portion of the work on Tierra Rejada Road. The total cost for this additional work is $66,363. • Spring Road -- Attached as Exhibit "C" is an outline of the additional design work required for the required improvements on Spring Road. The total cost for this additional work is $12,122 (if soils test and survey is not required the cost will be only $9,978). 3. Total Design Cost: A re -cap of the total project design costs are as follows: D. Amendment With the purchase of the above described insurance rider, the amount of the insurance coverage retained by Valcon Engineering for general public liability, property damage and professional liability will be $1,000,000. The terms of the Agreement between the City and Willdan Associates requires insurance coverage in the amount of $2,000,000. The attached Amendment to said Agreement (Exhibit "D ") provides for the reduction of the insurance requirements for the Tierra Rejada Road Widening Project to the $1,000,000 limit. wp \rpt \wldn Additional Item Prior Costs Costs Total 56,400 56,400 Tierra Rejada Road 66,363 66,363 Spring Road 12,122 12,122 Additional Insurance 3,832 3,832 10% Contingency 8,232 8,232 Total 56,400 90,549 146,949 D. Amendment With the purchase of the above described insurance rider, the amount of the insurance coverage retained by Valcon Engineering for general public liability, property damage and professional liability will be $1,000,000. The terms of the Agreement between the City and Willdan Associates requires insurance coverage in the amount of $2,000,000. The attached Amendment to said Agreement (Exhibit "D ") provides for the reduction of the insurance requirements for the Tierra Rejada Road Widening Project to the $1,000,000 limit. wp \rpt \wldn Tierra Rejada Road Widening Page 4 RECOMMENDATION Staff recommends that the City Council take the following actions: 1. Approve the attached Amendment to the Agreement for Engineering Services (Willdan) revising the insurance requirements for the subject project. 2. Approve an increase in the design fee in an amount Not To Exceed $100,000 for the design services required to complete the design for the subject project. 3. Authorize the City Manager to approve all actions and authorize specific items of work related to the design of said project. wp \rpt \wldn EXHIBIT "A" 1. South Meadows park Constructions Observation 2. Avenida Colonia - Nogales Construction Administration and Observation 3. Tierra Rejada Road Widening - Final Design and Preparation of Plans and Specifications 4. Spring Road - Peach Hill Road Street and Signal Redesign 5. Tract 4338 (UWC) Pressure Grouting Work and Construction Observation 6. Grading Plan Review and Right -of -Way Deed Preparation for 14303 East Los Angeles Avenue (Villanueva) 7. Tract 4081 (Colorer) Construction Observation 8. Tracts 3963 -1, -2, -3 (Griffin) Construction Observation 9. Tracts 3019 and 3525 (Warmington) Project Acceptance 10. CPD 90 -2 (UWC Commercial Project) Plan Review 11. IPD 90 -15 (Litton) Preliminary Project Review 12. IPD 90 -7, -8, -9, -10, -11, -12, -13 (West America) Project Coordination 13. Los Angeles Avenue Paveout AOC Reimbursement Coordination 14. Tract 4637 (UWC Town-home Project) Plan and Map Check 15. PM 4318 (Falke) Project Acceptance 16. Arroyo Vista Park Access Road - Legal Description Review 17. Final Paveout on Tierra Rejada Road for Tract 2865 (Pardee) 18. IPD 90 -1 (MVS Hotel) and RPD 90 -1 (MVS Apartments) Preliminary Project Review 91 WILLDAN ASSOCIATES El . INEf: =2S & December 15, 1992 Steve Kueny, City Manager City of Moorpark 799 Moorpark Avenue Moorpark, CA 93021 Subject: Tierra Rejada Road Widening Dear Steve: Enclosed is the work authorization to provide Public Works project administration services for the Tierra Rejada Road Widening Project. We have also enclosed a breakdown of Valcon's fee to final the plans. Please be advised, in order to meet the April deadline for start of construction, we should advertise for bids in mid to late January. Currently, there are several issues that need to be undertaken with utility companies for construction of their facilities and coordination of this project. In order to meet this deadline, it is imperative that we continue our work as shown in the authorization. To date, we have expended approximately $4,600 of the enclosed Extra Work Authorization for utility coordination and miscellaneous meetings just to keep the project moving. We will be submitting our design fees for preparation of plans for the Spring Road transition widening under a separate cover within a couple of days. Also enclosed is a letter from Valcon on obtaining $1 million in Professional Liability insurance as opposed to the current limit of $500,000. The additional cost to provide this insurance coverage is $1,032. Di1PLEXFD 374 POLI STREET -SUITE 101 • `✓ENTURA CA: L:�OR'JIA?3001 26' (% )51 6 - =.�9' / (E ;' f ;''I 07 9'. Steve Kueny December 15, 1992 Page 2 Please do not hesitate to contact Mark Wittgraf or me with any questions or comments. Very truly yours, Enclosures TS copy: Mark Wittgraf, Construction Manager Chuck Mink, Manager - Public Works Services JFKMGW jg 06329/3001 FMO499.LTR 111IJ i M N EXHIBIT "A" T ERRA REJADA ROAD WIDENING PROJECT PUBLIC WORK PROJECT' ADMINISTRATION The following is an amended authorization pursuant to Authorization No. 91 -04 "Note No. 3 ". This authorization supercedes all work in Authorization No. 91 -04. TOTAL COST A. Project restart including one (1) meeting with City staff and Valcon Associates and one (1) meeting with Valcon to coordinate previous work compieted, status with current requirements of project, and determine which alternatives the City desires to incorporate into the final design. $675.00 B. Meeting with City staff; Ramseyer & Associates, and Valcon to incorporate Science Drive intersection improvements, discuss off -site disposal areas, and intersection improvements at Spring Road, Science Drive and Moorpark Road. Pursuant to this meeting, Valcon will revise the plans to locate the Spring Road signal to ultimate location, provide ultimate grade on the north side and prepare revised disposal site plan from Ramseyer working drawings. $736.00 C. Coordinate with the five (5) original utility companies that have facilities within the project. These utilities are as follows: 1. Southern California Edison 2. Shell Pipeline Company 3. Camrosa Water District 4. Southern California Gas Company 5. Pacific Bell Coordinate with new utility companies not originally anticipated to have facilities within the project: 1. Ventura County Waterworks District No. 1 Coordination will include: a. Request status of final relocation design, material procurement, and scheduling of work crews. This work is limited to one letter and one follow -up phone call for each utility company. C'9 TQTAL COST b. Determine if utilities can be removed from service during construction of the road and the new utility lines. This work is limited to one meeting and one letter for each utility company. C. Include Camrosa waterline as an alternate bid item in the project. Incorporate their plans and specifications into the overall bid package. d. Receive and review final utility relocation plans. e. Provide utility companies with project plans for review of possible underground conflict. Request documentation of utility company satisfactory review. This work is limited to one letter and one follow -up phone call per utility company. f. Conduct an on -site meeting with Edison to coordinate proposed street light facilities. Prepare Notice to Proceed letter for Edison to begin design of street light electrical. g. Coordinate utility companies to provide stub - outs at future Science Drive for Carlsberg project. h. One (1) meeting with all utility company representatives to coordinate all time schedules for their work based on a. through f. $5,520.00 D. Provide additive alternative bids for complete road closure and one -way traffic as follows: 1. Access from intersection of Tierra Rejada and Spring Roads to the freeway from 7:00 am to 9:00 am. 2. Access from the freeway to the intersection of Tierra Rejada and Spring Road from 4:00 pm to 6:00 pm. Note: This alternate will provide access only at the time intervals as shown. The roadway within project limits will be closed at all other times, including nights and weekends. This alternate would only provide a dirt road with flagmen and traffic control set up. 95 TOTAL COST Prepare performance specification with specific requirements for traffic control, safety and temporary road $2,208.00 material for the contractor to prepare plans to facilitate this temporary closure. This plan would be submitted and approved by the City prior to the commencement of construction. E. Review all current easement documents and reversion to acreage for all properties along the project frontage to ensure adequate construction easements and /or right -of -way provided for the project. F. Review Negative Declaration to ensure project meets all requirements for environmental clearance. $368.00 G. Constructability review of revised construction plans, cross sections and phasing plan with updated revisions for Science Drive intersection, deletion of curb and gutter on the south side, full median improvements, revised disposal site, and Spring Road northeast comer paveout to ultimate width and ultimate grading along the north side adjacent to Carlsberg. $3,168.00 H. Update current specification package bid schedule and engineer's cost estimate (1989) since last estimate incorporating all changes for D aLd G above. Check design engineer's quantity estimate given latest revisions. Revise entire specification to 1991 SSPWC with 1992 supplement. $2,320.00 I. Incorporate requirements of the Storm Water Pollution Prevention Plan (SWPPP) into the bid documents. $736.00 J. Meeting with Design Engineer to review plan check comments for items D through G. $368.00 K Meeting with City staff to present final bid pack=age and obtain final approval. $368.00 I.. Prepare staff report to request "Advertise for Bids" and attend Council meeting to answer any questions. $736.00 M. Prepare 25 sets of plans and specifications for distribution to prospective bidders, set of instructions to counter persons at the City, and plan holder's list for the City's use. Distribute plans and specifications to the following plan rooms: 3 B TOTAL COST 1. F.W. Dodge 674 County Square Drive, #107 Ventura, CA 93003 2. Ventura County Plan Room 2630 Saddle Avenue, #101 Oxnard, CA 93030 3. Construction Market Data 142 Arena Street El Segundo, CA 90245 4. Ventura County Contractors Association Plan Room 1830 Lockwood, #110 Oxnard, CA 93030 5. F.W. Dodge #2 Coral Circle Monterey Park, CA 91754 6. The San Fernando Valley Construction Journal 28310 Roadside Drive, #137 Agoura Hills, CA 91301 *$440.00 *See note #2, page 5 N. Prepare scope of work for construction survey, soils engineering and material testing. Distribute to three (3) qualified firms (ea.) for soils and material testing only and obtain proposals. We would propose Valcon Engineering provide construction survey due to the complexity of the $ 1,472.00 project and the firm's prior envolvement. Review proposals and make recommendations to the City for award of contracts for these services. O. Answer questions from prospective bidders during the 30- day bid period. $1,472.00 P. Conduct prebid conference for attendance by all prospective bidders. Review with all attendees the requirements of the project and instructions on how to properly complete the bid forms to ensure the City receives responsive bids from all qualified contractors. $731.00 V Valcon Fee $41,900 At the request of the City, Willdan agrees to employ Valcon Engineering, Inc., as a subconsultant on this project. Willdan has expressed its concerns that said subconsultant performed design work on the project as a consultant to a private developer and not under the supervision or control of Willdan and that the documents prepared by Valcon Engineering, Inc., have been provided by the City to Willdan to be used by Willdan in connection with its services under this work order. The result is that a clear separation of potential liability as between Willdan and Valcon Engineering, Inc., cannot be made. In recognition of these circumstances; the City h,--s agreed to a limitation of Willdan's liability on this project. For the purposes of the project covered by this work order, and this work order only, the Agreement for Engineering Services between the City of Moorpark and Willdan Associates dated March 3, 1992, is amended by adding the following paragraph at the end of Section III.E.: "Notwithstanding any provisions herein :o the contrary, for the purpose of that certain project known as the "Tierra Rejada Road Widening Project ", the liability of Willdan is limited to the lesser of: damages suffered by City which are proximately caused by the negligent acts, errors or omissions of Willdan's subconsultant, Valcon Engineering, Inc_, or the amount of $500,000.00." This amendment applies only to this project a 3 shall not be applicable to any other project performed under the Agreement for Engineer "Ilg Services. Except as provided in this work order, all other provisions of the Agreement for Engineering Services shall remain in full force and effect. GRk D TOTAL PROJECT FEE $66,362 TOTAL COST Q. Attend bid opening and assist City Clerk with administrative duties during bid opening. $552.00 R. Prepare bid spread sheet and analyze bids for irregularities and other errors that would render aLv bids as non- responsive. Conduct background reference checks and State Board of Contractor's license verification for the lowest bidder and prepare summary of findings from background investigation in a memo to the City. $1,296.00 Prepare staff report and Council item to recommend award of contract for construction, soil engineering services, construction surveying and material testing_ 11,296.00 Grand Total Willdan Fee $24,462.00 S. Valcon Engineer's fee per the attached proposal. Valcon Fee $41,900 At the request of the City, Willdan agrees to employ Valcon Engineering, Inc., as a subconsultant on this project. Willdan has expressed its concerns that said subconsultant performed design work on the project as a consultant to a private developer and not under the supervision or control of Willdan and that the documents prepared by Valcon Engineering, Inc., have been provided by the City to Willdan to be used by Willdan in connection with its services under this work order. The result is that a clear separation of potential liability as between Willdan and Valcon Engineering, Inc., cannot be made. In recognition of these circumstances; the City h,--s agreed to a limitation of Willdan's liability on this project. For the purposes of the project covered by this work order, and this work order only, the Agreement for Engineering Services between the City of Moorpark and Willdan Associates dated March 3, 1992, is amended by adding the following paragraph at the end of Section III.E.: "Notwithstanding any provisions herein :o the contrary, for the purpose of that certain project known as the "Tierra Rejada Road Widening Project ", the liability of Willdan is limited to the lesser of: damages suffered by City which are proximately caused by the negligent acts, errors or omissions of Willdan's subconsultant, Valcon Engineering, Inc_, or the amount of $500,000.00." This amendment applies only to this project a 3 shall not be applicable to any other project performed under the Agreement for Engineer "Ilg Services. Except as provided in this work order, all other provisions of the Agreement for Engineering Services shall remain in full force and effect. GRk D TOTAL PROJECT FEE $66,362 Notes: We will submit a separate authorization at the award of contract for construction management services based on construction detour alternatives selected by the City. 2. All outside expenses for blueprinting, copying, site photos, etc., will be billed as an extra cost. 3. A revised authorization amount may be necessary for extending the bid period due to the City's or other utility company's delays to the project. FM0498.WS 0 a l "Yi December 11, 1992 W.O. 50- 6178 -12 Willdan & Associates I 374 Poli Street Ventura, CA 93001 Attention: Mark Wittgraf The Valcon Group RE: TIERRA REJADA ROAD IMPROVEMENTS Valcon, Inc. Dear Mr. Wittgraf: Vakoa /GIS,Inc. Valcon Engineering, Inc. The following list summarizes our breakdown of costs for re- designing and drafting the Tierra Rejada Road plans: Part I 1. L.L. &G. revisions to traffic signal plans per L.L. &G. invoice dated 9130/91 (not billed) ............................................. ............................... $2,700 2. Valcon start up costs including: • plans review • conformance to latest Greenbook edition • coordination meetings prior to revising plans • reproduction costs prior to revising plans .... ............................... 1,850 Part II 1. Engineering cost to re- design plans for full median improvements including drainage and cross sections ................. ............................... 6,480 2. Re- design N/E quadrant of Spring Road and Tierra Rejada intersection to match General Plan width including design for grading to fill in low spot on Carlsberg property. Re- design will accommodate ultimate grading along north side, which will primarily include moving concrete V ditch north of R/W line at fill areas, and eliminate dirt access road at sta.57 +50 ...................... 3,200 3. Design cost to delete curb and gutter on south side along Watt property (sta.40 +00 to 73 +00) incuding drainage design and 73 Mood %court plan revision .............................................................. ............................... 4,440 Thousand Oaks. CA 91360 19191889-8822 • (905) 4944.16.1 N% (805) 496•2318 Cad Ergs ee—z • Su,m is • (. 111' 921206 Willdan & Associates Page 2 &to Re: Tierra Rejada Road Improvements 4. Engineering cost to prepare final quantity estimate. Due to the re- design we feel that this estimate should be totally re -done and checked. This includes curb and gutter, median, drainage and pavement ........................................................... ............................... 2,000 5. Prepare earthwork volume calculations. The earthwork calcu- lations will be totally re -done due to the re- design of such items as: curb and gutter, median improvements, disposal site and ultimate grading on the north side for Carlsberg property........... 4,900 6. Engineering cost to revise plans to accommodate new disposal site........................................................................... .....................•......... 950 7. Engineering cost for coordinating with all utilities including phasing of utilities, investigating conflicts, determining number of move -ins including: • review of each utility plan. • verify horizontal location of each utility and revise Valcon's composite utility plan as necessary. • identify potential utility installation problems with respect to detour phasing by overlaying acetate of detour plan on utility plan. • identify potential horizontal and vertical conflicts. • present conflicts at one utility meeting arranged by Willdan. • review revised utility plans after conflicts are presented. • revise Valcon's final composite utility plan . ............................... 6,980 8. Engineering cost to re- design the traffic signal plans to accommodate the ultimate improvements at the northeast and northwest corner of Spring Road in accordance with the new general plan and as directed by Willdan. Drawings will be revisedby L. L.& G ................................................... ............................... 4,000 9. Process Moorpark Road South improvement plans to obtain County permit (does not include processing detour plan) ........... 1,200 10. Prepare design for curb, gutter and sidewalk along north side of Tierra Rejada Road from Spring Road westerly to the existing curb and gutter (approximately 500 feet). We anticipate the existing A.C. pavement will be severely damaged due to utility construction in this area; therefore, Valcon will design this section of pavement to acommodate an overlay..... 2,700 11. Soils engineering plan review and signatures ... ............................... 500 921206 Willdan & Associates Re: Tierra Rejada Road Improvements Page 3 12. Reproduction costs will be billed as reimbursables ....................... reimbursable Total............... ............................... 41,900 (plus reproduction costs) In order for Valcon to meet your tight time schedule we will need immediate authorization to proceed. We also expect payment of our invoices within a week after you are paid by the City. Let us know if there is any problem with this arrangement. Sincerely, J. f John F. Heck, III Principal -in- Charge u7•;�0C, C -t U � WILLDAN ASSOCIATES ❑ -N6 NEEDS, & RJ-' .` . F-- f1foressiono! Const: ' ng I"f1 ices -�.nce 1964 December 16, 1992 Steve Kueny, City Manager City of Moorpark 799 Moorpark Avenue Moorpark, CA 93021 Subject: Spring Road Improvements Dear Steve: Enclosed is the work authorization to provide design services for the improvements on Spring Road in conjunction with the Tierra Rejada Road Widening Project.. We have included a sketch of our preliminary street alignment for your review. In the preliminary design concept we have proposed an extension of the curb line adjacent to the Embassy Project to tie into existing improvements at Christian Barnett Drive. Sidewalks can be easily added within right -of -way; however, the original concept with the Embassy project was for a meandering sidewalk. Street lights are not currently included within this project. Pavement transitions along the east side of Spring Road will join the revised curb return on Tierra Rejada Road and transition to provide the lane configuration shown on the preliminary design concept plan. There appears to be a discrepancy in the lane configurations called for in the Carlesberg Traffic Study; however, we have assumed that study will eventually conform to the lane configurations shown. Utility stubouts onto the Embassy parcel will be the responsibility of future development. The design for Spring Road will be completed by mid January and incorporated into the Tierra Rejada Road Widening Project. It should be noted that the costs as proposed includes outside consulting costs of $2,400 for surveying and $2,445 for soils testing. Both of these costs can be reduced substantially if sufficient information is available in the City files for the Embassy project and for Tract 2865 -4, north of the Embassy project. DUPLI7CP.D 374 POLI ST = -ET • SUITc 101 - VENI URA, CALIFORNIA `.,300' -2 6 ?? • (805) 653 -6597 • FAX (805) 643 ;791 Steve Kueny December 16, 1992 Page 2 Please do not hesitate to call Chuck Mink or me with any questions or comments. Very truly yours, IATES J Vice President Enclosures copy: Charles S. Mink, Manager - Public Works Services Mark Wittgr4 Construction Manager JFK:CSM:Jg 06329/3002 FMO500.LTR c -z SENT BY:WILLDAN VENTURA ;12 -28-82 ; 2 :46PM WILLDAN VENTURA-0 85288270;# 2 C -3 9COS'!c Oir TMCRm► F=AM AOsD WMINM SErtV CM Design Sa yhn SD' SprtnB Road The objective of this design task is to prepare construction plans of a section of Spring Road for insertion into the Terra Rejada Road Widening Project The plan preparation will incorporate information mined on the original mupproved and unsigned plans prepared for the Embassy project. Field verification of the skis q topo and e*ting improvements, Utility noti8cadoms6 and surM mitrols are necessary to prepare the required design. Roomy deWM including street transitions, and drainage improvements will be coordinated with the construction plans prepared for the TYerm Rejada Road NVidenW& Proj"- Spring Road a vements will include pavement transitions along the east side of Spring Road. The intersection of Spring at Marra Rejada will inchrde one right turn lane and one left -turn lane, a painted median, one northbound lase and a trand&ning of the pavement from the curb return to the 30-fact wide pavement between Tierra Rejada and Christian Barret Drive. The out side of Spring Road will be graded to provide for an 8 -foot shoulder and a drainage swale. Pavement width will transition from the 78 feet required at Tierra Rejada to join the existing pavement south of Christian Barret Drive (two lanes of traffic). Drainage along the east side of the project wM be maintained in a graded earthen ditch. A. Obtain preliminary design information to include approval of preliminary design concept, data, field verification of MUtting improvements. S 346 B. Prepare Plan and Profile sheets to include pavement des:IM Odin& drainage, and utilities. $ 3,259 C. Prepare of traffic signing and striping plans, and traffic control plan for phasing construction to provide two lames of traffic during construction. $ 2,097 D. Coordinate and assimilate desgn plats into Valeon's bid package. L_ Subtotal: $ 9,978 E. Survey control, additional topo, And data verificsNon 3 Im F. Soils tat for R Vahms $ 1,292 TOTAL, $12,122 DEC 29 '92 14:50 -- _ PAGE.002 is A ILI, .Q.0p F. l onq - CS�� ow ii� 04, GAN 01. SPA k hP s' , is AD &IMI AF i5p 3) December 16, 1992 Amendment to Agreement for City Engineering Services At its regularly scheduled meeting of December 16, 1992, the Moorpark City Council approved an amendment to the Agreement for City Engineering Services with Willdan Associates, dated March 6, 1991. All provisions and requirements of said Agreement shall remain in full force and effect except as follows: Section III G of the Agreement is amended to read: " G. Consistent with the provisions of this Article, the ENGINEER shall provide general public liability, property damage and professional liability insurance in an amount not less than Two Million Dollars ($2,000,000) per occurrence and annual aggregate. The limits of insurance coverage for general public liability, property damage and professional liability for work related to the design and other services for the Tierra Rejada Widening Project shall be limited to One Million Dollars ($1,000,000). John Knipe Paul W. Lawrason Jr. Willdan Associates Mayor Attest: Lillian Hare, City Clerk wp\rpt`wldn To: Steve Kueny, City Manager From: Mark Wittgraf, Construction Manager A44 V✓ Date: December 30, 1992 Subject: TIERRA REJADA ROAD WIDENING PROJECT MEDIAN COST ESTIMATE RECEIVED Mc 3 1 X992 i,Ic- The following is the estimated additional construction cost to delete the temporary median improvements as currently shown on the plans and provide full- raised median improvements over the entire project length: Item No. Description Quantity unit Price Total Cost To Be Added: 1. 6 -inch P.C.C. Curb 3,250 LF $9.50 $30,875.00 2. 6 -inch P.C.C. Curb w /12 -inch gutter 3,250 LF $12.00 $39,000.00 3. Catch Basin, w = 7 feet 2 EA $3,000.00 $6,000.00 Total Added $75,875.00 To Be Deleted: I. 5 -inch A.C. on 18 -inch Base 3 500 SF $2.15 <$7,525.00> 2. Median Ribbon Gutter 2,725 LF $19.00 <$51,775.00> Total Deleted <$59,300.00> Esd at >J Total Additional Cost for Raised Median Improvements $16,575.00 copy: Ken Gilbert, Director of Public Works, City of Moorpark John F. Knipe, Willdan Associates NIC W:lc 06365/301 FM0502.NtHN4 or wo //C I u ��- �Or dirt C Cow: ro n ere c- �Y� 262.05 CoNST C�+tc�F g�a ,�/»` /O r`' S • O. l- r�,2� -- . %coje e�i�r /rig . - - • . , � �±�— _ �� -' � f ,. ' � ', •: R, ICI � t/ • � r ! J i 1�y � -ter - 1' -_ �N STis RL J r_ •l 57�j 53 t-2q 7/ /�sfo// /2 - -- - - f�17, ���i�r og0 �� ���s c -5.'. Pas ey Gcr' Slzd. C