HomeMy WebLinkAboutAGENDA REPORT 1993 0203 CC REG ITEM 08D%J w i IT E • �. AGENDA TO: The Honorable City Council �AC-iicv: FROM: Kenneth C. Gilbert, Director of Public Works �( B� DATE: January 26, 1993 (Council Meeting 2 -3 -93) SUBJECT: Consider Retaining a Consultant to Perform Soils Testing Services During the Construction of the Tierra Rejada Road Widening Project OVERVIEW This presents an Agreement for professional services required to perform soils testing and analysis during the construction of the subject project. DISCUSSION The contract with Willdan Associates for the preparation of the design for the Tierra Rejada Road widening project, includes efforts required to retain a firm and administer a contract for soils testing services during construction of the project. The design engineer solicited proposals from several firms to provide these services. Proposals were received from two firms. These proposals demonstrated that each firm adequately understood the scope of the work required and possessed the qualifications required. A summary of the fee quoted by each of these firms is as follows: • Geolabs- Westlake Village $69,735 • Bueana Engineers $73,835 RECOMMENDATION Staff recommends that the City Council take the following actions: 1 approve the selection of Geolab- Westlake Village, Inc. to perform the subject professional services for a Not to Exceed amount of $69,735; 2 approve a ten per cent (10%) contingency for this work and authorize the City Manager to approve additional work, if required, for an amount not to exceed ten per cent (100) of the contract price. 3 approve an Agreement between the City and said firm for said services, to be in the form of the City's standard professional services agreement, subject to final language approval by the City Attorney and the City Manager; and, 4 authorize the Mayor to execute said Agreement. vAt! d" SENT BY:WILLDAN VENTURA �.1 -22 -93 . 3:17P.M WILLDAN VENTURA-* 95298270;# 2 To: Ken Cilbut, Director of Public Worb From: Mark G. Wittg>ra, Construction Manager A%411 Date: Jannary A 1993 Subject: GEOTEC>E MCAL 5E MCB8 FOR THE TMRRA RBJADA ROAD WIDENING PROJZM As part of our services, we requested proposal from PWo McclellamA Buena Engineers, and Geolabe- Wesdalm Village for geotecbaical services for the project. Pago MaQelland doclined to submit, with Buena and Geolabe both providing propoeay. We have reviewed both proposals, and determined the scope of work and testing services as described will adequately meet the requirements of the project. Daring the proposal phase, Geolabe- Westlake VMMC was instrumental in providing us with information concerning the alhMAl. removal and other area of the project of special concern. Consequently, we are revising the spedficatian to provide for alluvial removals and special treatment of 1.5:1 slopes, Geolabs- Westlake Wage's proposal fee is $69,735 on a time and material; basis. This is $4, 100 leu than Buena Engineer's fee for the work. As we discussed, we would Me to have the contract awarded at the February 3rd Council meeting. This will allow time for Geolabs to perform a geotechnical review of the plans, ap6dfications and soils report, and to emm we have adequately covered the Im earthwork operation and other specialty items in the project. We have attached the Geolabs- Westlake Village final proposal for your staff report. Attachment mGwdg oG 513M JAN 22 193 15:22 PAGE. 002 E SENT BY :WILLOAN VENTURA 1 -22 -93 ; 3 :17PM ; WILLDAN VENTURA-► 95298270;# 3 GEOLASS- WESTLAKE VILLAGE Foundation and Soils Engineering, Geology 749 Hampsturo Rd., Suit* C • wostials• Vilbaiva. CA 01361 (010)009.2561 - (605)495 -4107 • !a: (805)370 -9003 a cUact of R 6 11 so.-i'70% Corporation January 21, 1993 W.a.8215 Willdan and Associates 374 Poli•Street, Suite 101 Ventura, California 93001 ATTENTION: Mr. Mark Wittgraf SUBJECT: Proposed Cost,Geotecrnical services, Tierra Rejada Road Widening Project, City of Moorpark, California GENTLEMEN: Submitted herewith is our estimated cost of the geotechnical services that will be required during the development of the subject site. We are basing.this proposal on the normal amount of testing associated with projects of this nature with a quick synopsis given below: 1. Rough Grading: We understand that the rough grading will be completed in three separate phases with one month allotted for each phase. our daily rate includes constant inspection, 8 hour day, during fill placement and alluvial removals with periodic supervi- sion, engineering, and laboratory =axes. Also included during rough grading we will sample and perform expansion tests for side- walk and curb and gutter design recommendations, "R° Values for street design, provide final pavement section recommendations, . miscellaneous reports (such as 1.5:1 fill slope design), and a final compaction and geology report for the entire site. 2. Stre!t Utility,Ba¢kfill: Includes a test for each three foot of backfill for every 300 feet of main line that is placed within JAN 22 '93 15:22 SENT BY :WILLDAN VENTURA ; 1 -22 -93 ; :18PN ; WILLUAN VENTURA4 95298270;# 4 .Wildan and Associates ,2- January 21, 1993 W.O. 8215. the street right -of -way. We will also provide concrete cylinder testing for the headwalls. One final report covering all the utility testing will be subaitted for the entire project, and 2 interis reports during construction. 3. StraCt Imbrovemtnt Testing: Includes One test for every 300 feet per two lane of traffic and every 300 feet for curb and gutter subgrade and base. A -SO included is the laboratory testing of imported subbase and /or base. One final report will be issued for the entire project, and one intarin reports' during construction. Our services for the above will be performed at the following rates. It should be, noted that the below costs are for passing tests only. Therefore the costs of all failing test and /or inspections Will be considerad an extra which we suggest your firm pace on to the appropriate contractor. ROUGH GAG Principal Engineer and Geologist........ ... ... ... Staff Engineer and Geologist.. Fill control- Daily.... ..... Field Technician- .xiscellanscus (Clearing, Fine Grading, ect.). "R" values (Includes Report).. Expansion Tasting ............. Miscellaneous Reports......... final Report .................. 45 bra @ 95 /hr. -..$ 4,275.00 160 bra @$ 65 /hr....$ 10,400.00 70 days @$ 425 /day.. -$ 29,750.00 4C bra @$ 50 3 tsts @$ 310 2 tstsQ$ 55 3 rpts@$ 350 1 rpt @$2500 Subtol :w r . M Principal Engineer............ Staff Engineer ................ Laboratory.. .... ... ..... Field Technician (260 tests).. Concrete Cylinders (3 /sat).... Interim Reports .............. Final Report .................. 10 bra @$ 30 hre @$ 10 bra @$ 80 hra @$ 5 sets@$ 2 rpte @$ 1 rpt &$ 95 65 55 50 5o 350 1200 /hr....$ /test..$ /test..$ /rpt...$ /rpt ... $ :al: $ /hr .... $ /hr .... $ /hr ...,$ /hr....$ /sat...$ /rpt ... $ /rpt ... $ 2,000.00 930.00 110.00 1,050.00 2,500.00 51,015. 00 950.00 1,950.00 550.00 4,000.00 250.00 700.00 1,200.00 Subtotal: $ 9,600.00 GEOL.1BS - WESTLAKE VILLAGE • JRr; 22 ' 93 15:23 PAGE. 004 SENT BY :WILLDAN VENTURA ; 1 -22 -83 ; 8 :18PN WILLDAN VENTURA-* 85288270;# 5 Wildan and Associates 3 January 15, 1993 W.O. 8215 Principal Engineer............ 10 hrs @$ 95 /hr .... $ 950.00 Staff Engineer ................ Laboratory 20 hrs @$ 65 /hr .... $ 1,300.00 ..................to Field Technician (180 tests)... 24 80 hrs hrs @S @$ 55 50 /hr....$ /hr,,..$ 1,320.00 4,000.00 Interim Reports ............... Final Report 1 rpta9$ 350 /rpt ... $ 350.00 .................. I rpt @$1200 /rpt ... $ 1,200.00 Subtotal: $ 9,120.0 0 Enclosure: Agreement and Work Order XC: (2) Addressee GEOL.ASS - WESTL.AKE VILLAGE JAN 22 '93 15:23 PAGE. 005 TOTAL: $ 69,735.00 Since our services depend entirely upon the quality and quantity of the earthwork performed by your subcontractor, it is entirely possible that our total cost may range from $68,000.00 to $72,000.00. It should be noted that you will be billed only for the actual time spent on the job which will be verified by dally time tickets signed by your field representative. �✓`1 1,y J`� .` It this proposal meets your approval, please sign and return the enclosed Work Order and Agreement so we may proceed. Please feel free to contact this office should you have any questions. Res tted; OLABS -WEST KE ILLAGE J. ROBERT PRESIDENT Enclosure: Agreement and Work Order XC: (2) Addressee GEOL.ASS - WESTL.AKE VILLAGE JAN 22 '93 15:23 PAGE. 005 SENT BY:WILLOAN VENTURA 1 -22 -93 ; 3 :19PM WILLDAN VENTURA-* 95298270:9 6 GEOLABS - WESTLAKE VILLAGE 742 Hampshire Road, Suite C, Westlake Village, CA 91361 (806) 495 2197 (919) 689 2662 FAX (805) 879 2603 1W.0. $215 AGREEMENT AND WORK ORDER THE UNDERSIGNED (1-14REWAFTER REFERRED TO AS "CUENT -) HEREBY RETAINS THE SERVICES OF A & R SERVICES CORP., dba GEOLABS- WE8TLAKE VILLAGE, UPON THE FOLLOWING TERM$ AND CONDITIONS: 1. TYPE OF JOIL Gootechnical Services* 2. JOB SITE: - VRe a dross /County stets Zip Code S. RECEIVEo FROM: WHldqn and A&soQkft9 MOTs( WtHamf ram• Company Agent Tltts 374 Pgit Street . $ulte 101 Ventura CatBomle covet �ddr•ss qty 'M Zip Ccde 4. FEES. COSTS AND ESTIMATtr. A. FEES: Principal Engines► /GeoloQIM: Staff Engkow /Geologist: Laboratory: TechnWani P 95.00 per hour 6 65.00 per hour t 56.00 per hour i 60.00 per four Toohniclan Overtime Hale: $_ NIA per how (tune In 4x04114 Of 6 hours In any O"n day or Hms on Saturday, Sunday or Hotidaysj Additional work such as plan w4ew, Aeld observations and tisling, slo. are billed at stated fate& with Q hour rhinknurn for Mid hispeadw The above tees and overYrns etas are subject to change If the particular o4miflcation of personnel ass forth above recehras an hourly rate Increase by vMue of labor unionisation or labor dentsnda. s. COSTS; Waage Xerox Rate Typing Postage d, 8lusprtnt Drilling end Equipment Rsnfal Retainer. tU 6.30 /mile $•20 /am $2.00 /page Ott ootit Cosy plus 13% to $2000 OW plus 10% for amount Of cost above $2000 C. ESTIMATE OF FEES AND COSTS; $68.000.0 00 0 - S72.0.00 0 Including equipment renisi • Sas Propessi dated Jsnuary 21. I not Including equipment rental Irvoices will be rendered Monthly during progress and upon corWe6on. Terms to bet Net cash on or before the 10th day following malting of invoice. Cash upon ooMplellen of the report as Indicated In No. 1 above. M 810te end local nAss and npul&dons are subject to changing interpretatlons; thwefors, the eetlmate hereunder does not Include any additional time which may be required as a resutt of findings and oonoknions of State and local agencies, boards or officers neossa"kV further sen foes of GEOLA88•WFS3TWcE VILLAGE. Where applicable, sale• tax wilt be added to all profealonsl charges. Wotk Authorized and Requested by: nature Accepted: fl e R 8ervlees Co S • E VILLAGE 13y: Title: PRE=SIDENT Dated. Dew: January 21. i2m MAU INITIAL Ds • TERMS AND CQNDITIONS ON • _j MSIDT JAN 22 193 15:24 •r