Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0707 CC REG ITEM 08IAGENDA REPORT THE HONORABLE CITY COUNCIL ITEM 861:4 7- 7 �c93 � nuen e, FROM: DIRK LOVETT, ASSISTANT CITY ENGINEER L• DA E: JULY 1, 1993 (CC MEETING OF JULY 7, 1993) CONSIDER PLANS AND SPECIFICATIONS FOR PHASE II OF ASSESSMENT DISTRICT 92 -1 (MISSION BELL PLAZA) On ugust 19, 1992 the City Council adopted a Resolution of Intention to create Assessment Dis ct 92 -1 in conjunction with the Mission Bell Plaza. vements included in this Assessment District: Street improvements: a. Los Angeles Avenue from Park Lane to approximately 200 feet west of Liberty Bell Road. Improvements on the north side of Los Angeles Ave. include curb, gutter and sidewalk. Improvements on the south side of L.A. Avenue include widening the street to the ultimate width of 118 feet and the construction of curb, gutter and sidewalk. b. Park Lane from Los Angeles Ave. to Lassen Ave., full width improvements including curb, cutter, and sidewalk. C. Lassen Avenue west of Park Lane, full width improvements including curb, gutter and sidewalk. d. Liberty Bell Road, both north and south of Los Angeles Ave. Improvements north of L.A. Ave. will include full width improvements up to the first driveway of the plaza. Improvements on the south side of L.A. Ave. are necessary to facilitate the widening of L.A. Ave. and will include full width improvements on the east and interim widening on the west. A NDA REPORT Ju 29, 1993 Pa 2 2) 3) 4) A A Water system improvements. Storm drain improvements. Traffic signals on Los Angeles Ave. at the intersections of Park Lane and Liberty Bell Road. tional R -O -W has been acquired to complete improvements on the south side of L.A. iue and on Liberty Bell Road Con truction of the above mentioned improvements require that the City receive public bids. Pha I (all improvements outside of the State right of way) of the Assessment District have prev ously been bid and are currently under construction. Phase II (within the Caltrans right of way, are currently in final review by Caltrans and should be approved within the next few weeks with I only minor changes. Plans and specifications for the Phase II improvements will be sub itted to the Council under a separate item. Any changes desired by the Council can be mad at this time. Staf will advertise for Phase II bids upon approval by Caltrans. It is believed that a contract shou be awarded in mid August. To expedite the Phase II construction, Staff has already orde d the fabrication of the traffic signal hardware. AD 9 1-1 Improvement fund (cons ruction and acquisition) Co ts: Ph se I construction contract Ph se II construction estimate Uti ity relocation estimate Rig it of way acquisition estimate SUBTOTAL 20� Contingency TOTAL COSTS Remai der $2,567,956.33 ($ 821,000.0)) ($1,071,000.00) ($ 200,000.0)) ($ 15,00.00) ($2,107,(W.00) ($ 421,(M.(X)) ($2,528,000.00) ($2,528,00).0)) $ 40,000.00 2) 3) U NDA REPORT 29, 1993 3 Approve the plans and specifications subject to minor Caltrans changes. Authorize the Director of Public Works to approve any minor changes. Authorize Staff to-- ,public - public bids.