Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0818 CC REG ITEM 08FWE FRO #: DAT *: ITEM AGENDA REPORT C = TY O F MOORPARK The Honorable City Council Kenneth C. Gilbert, Director of Public Works k August 2, 1993 (Council Meeting 8- 18 -93) 7CR ?ARK, G1'_' —% A SUB*ECT: Consider Authorization to Advertise for Receipt of Bids for the Construction of an Access Road to Serve the Sunnyslope Debris Basin BACJGR9UND 1. the Budget for FY 1993/94 includes a project [page 143.3: 143- 03] for the construction of the subject project. 2. this project is funded by Fund 023, Assessment District 84 -2. 3. the Staff Report which accompanied the Budget and annual ssessments for AD 84 -2 included this project. 4. As mentioned in that staff report and approved by the City Council, the source for the funding for this project is a ortion of the surplus Improvements Assessments levied upon the ots within Zone of Benefit #2 (Tract 2865) over several years or the construction of the Tierra Rejada Road median landscaping. DIS6USSION A. Project Description he City maintains a number of the storm drain debris /siltation asins located south of certain lots in Tract 2865. Pursuant to he Conditions of Approval, the cost of said maintenance is to e funded by a portion of the Zone 2 benefit assessments levied jipon the lots in that Tract. ne of the storm drain debris /siltaion basins is located south f Lot 226 on Sunnyslope Place (See Exhibit 1) . This debris asin was constructed in a manner which does not provide for ehicular access to the floor of the debris /siltation basin. his makes it difficult to impossible to provide required aintenance (silt removal, etc.) at this location. The purpose pf this project is to construct a maintenance access road to enable the City to provide this maintenance. suny -r4. 0 Sun yslope Access Road Pag 2 B. t1ans and Specifications ttached as Exhibit 2 is a sketch of the proposed access road to e constructed. A full set of draft Plans and Specifications or this project have been distributed to the City Council under eparate memo. C. Fiscal Impact +n estimate of total costs for this + Design: Construction Contract Admin & Inspection Total Budget Amount: project is as follows: $4,960 $16,000 $2,000 $22,960 $21,640 he preliminary cost estimate is slightly higher than the budget mount. More accurate costs will be available subsequent to the eceipt of bids. It is recommended that any required budget mendment be deferred to that time. IZE96MMEV-AT-IONS Sta f recommends that the City Council approve the plans and spe ifications for the project and authorize staff to advertise for bid . Burry -=ji C6�� 5CALE: 0-10' EXISTING IB' GM•P. (APPROX. LOCATION) 6X�S, Jo 3 � �y 5 � EX15� I WL.II)6 Ex6T. FENCE -g Ii 1 i ' s� j I EXISTING _ FENCE /WALLA .��' 1. PROS o U RETAINING ��. i 1 / 1 ('VALE X�sr J ° (690 1 1/ \ \STORM ORAL x Z� INLGT 51i2/!Cf 1 PER OYJG. NQ 5 4�(0 10215 .XRF' k� Z� \ 1 Nod �H APPROVED CITY OF MOORPARK- 1 XISTING FLOW LINE \ IT �S lU I- I � DESIGNED Mm I DWI MM6 I CHECKED HYp PROS ENG, I RECONMIEIDm GENERAL NOTE& L ALL CONSTRUCTION SHALL C0NFO11M TO THE STANDARD SPECPIfJ1T10N5 FOR PU r wows comsTRUCTION, LATEST EDMOK ALL GRADING 9ALL COHEYRIN TOM SSFOBA BUILDING CODE, LATEST E NTIOHL L NO 0[>t0H MA "S pD OWmEO FOR THIS PROJECT. YERTICAL • NORaOlWM CONTROL R AP'PRO IIRL s ALL gwTBM MFOIUNTION ON TMs / /w is BASED ON -As BULr Rµ NO S34K M4&4003 PROVIDL'D BY TW CITY. TIlDE40NFR/OICSE'm HAAS AND RE N6111LITY To THE A=IFACY Or TMs 4. IT s TIE arcs WSPONEeLm TO LOCATE ON fq Ir ur Dow PIPE. TIES VA. BASED VUBELD CHECK AND a O ON *A WALT' PLAN s rt OED �ED TLY w O T E c. ANY /� WRr MOIrATgI/ sHIDWN aN THIS ONLY PLAN n sAlsED oN r PLAN ntwIDED sr TIE CffY AND n AT ITS APPROMATE LOCATIOK ). DUE TO UNCLEAR AND WDOWLETE WORIAATION SHOWN ON *AS MALT' PLAN PROVED SY THE CITY. ALL OWINTTTTEs SHOWN ON TM PLAN ARE APPROXIMATE THE DESNGNlTt/ERCINEOI HAS NO RESroNlIA.ETY TO THE ACCIRACY OF THE OUM'TTTIES, CONTRACTOR SWILL SATISFY HIMSELF TO THE ACCL ACY OF THIS ESTBATE S. THE aru AND SLOPE OF THE PROPOSED 24- CW WAS DESIGNED BASED ON PROFES90NAL ADGFAENr. PER CITY'S KSTRUCTIOK NO HYDROLOGY OR HYDRAULIC CALCULATIONS WERE PERFORMED. 9. THE DE31OIER/INGUIEEER RECOMElDS T/AT THE CRY VERY CLOSELY MONITOR THIS PROJECT OLIAM CONSTRUCTION. b. UTI1TEs. F ANY E]OST HAVE NOT BEEN RESEARCHED OR LOCATED ON THIS PLAN. IT S CITY3 RESPONSIBILITY TO PROVIDE THS INFORMATION. CONTRACTOR SHALL PROCEED WITN CAUTION DURING GRAD04 OPERATIONS. CONSTRUCTION NOTES 8 QUANTITIES OI CONSTRUCT 2" A.C, ON 3- A9. _ .......... ........___..__.._......LUMP SUM O2 CONSTRUCT 24" CMP AND — ...... _ ......... — ._.........31i L.F. ITS INLET 8 OUTLET O EXCAVATION 8 BACKFILL .__ _._— .___.__._LUMP SUM O RETAINING WALL (SEE SHEET 2 OF 2)..— ...__.._LUMP SUM OS MODIFY EXISTING 18" CMP �.._...._._...._.— .._._......._LUMP SUM CITY o F SUNNYSLOPE M O O R P A R K PLACE DRAWING NO.