Loading...
HomeMy WebLinkAboutAGENDA REPORT 1992 0325 CC SPC ITEM 11II h. MOORPARK ITEM 799 Moorpark Avenue Moorpark, California 93021 (805) 529 -6864 MEMORANDUM TO: THE HONORABLE CITY COUNCIL FROM: DIRK LOVETT, ASSISTANT CITY ENGINEER DATE: MARCH 25, 1992 SUBJECT: CONSIDERATION OF BIDS FOR AWARD OF CONTRACT FOR THE CONSTRUCTION OF THE HIGH STREET STORM DRAIN, SIDEWALK, CURB & GUTTER IMPROVEMENT PROJECT OVERVIEW Cau. cil N Veflng f s 199 t --,F/ ACTION: B This presents a summary of the bids received for the subject project and recommends award of a contract for said construction. DISCUSSION A. Background The purpose of this project is to 1) extend an existing storm drain in High Street from Walnut Street to Magnolia Street consistent with the Downtown Master Drainage Study; and, 2) construct curb, gutter and sidewalk improvements at certain locations on High Street where existing improvements are either substandard or missing. B. Fiscal Impact 1. Budget and Funding Sources: The Budget for Fiscal Year 1991/1992 shows the funding for this project as follows: Gas Tax Fund 03 High Street Streetscape 20,000 Sidewalk, curbs and gutters 811096 Storm Drains 250,000 351,096 SB -821 Fund 015 Total 20,000 29,452 110,548 250,000 29,452 3801,548 PAUL W. LAWRASON JR. BERNARDO M. PEREZ SCOTT MONTGOMERY ROY E. TALLEY JR. JOHN E. WOZNIAK Mayor Mayor Pro Tern Councilmember Councilmember Councilmember Printed On Recvcled Paner IMPROVEMENTS TO HIGH STREET MARCH 25, 1992 PAGE 2 C. Im E. 2. Project Cost Estimate: The following is an estimate of total project costs. Element Estimated Cost ($) • Design 29,000 • Geotechnical Review 4,000 • Construction 2160,000 • Inspection 25,000 Subtotal 274,000 Contingency (15% ±) 41 000 Total 3151000 Bid Summary On March 161 1992, bids were received, opened and tabulated. The total amount bid by the apparent low bidder is $215,317.85. A summary comparison of the bids received is attached as Exhibit A. Qualification The apparent low bidder is Miki Construction of Woodland Hills, California. The Bidder possesses the proper contractor's licenses and is experienced in construction of the type of work required. Inquiries made to previous employers have been favorable. The Bidder has confirmed that prices bid are accurate and has stated interest in proceeding with the project. Boardwalk Option Pursuant to City Council direction, the bid documents allow the City to omit the reconstruction of the Boardwalk across from the Moorpark Melodrama (bid item #49). The net effect of exercising this option is summarized as follows: Total Bid Amount $2151,317.85 Deduct Bid Item ##49 (8,200.00) Est. Additional Quantity of Sidewalk 2,000.00 Net Deduct Amount (6,200.00) (6,200.00) Reduced Bid Amount $209,117.85 F. Schedule It is anticipated that construction will begin by the end of April and be completed by mid -June. ' IMPROVEMENTS TO HIGH STREET MARCH 25, 1992 PAGE 3 RECOMMENDATIONS Staff recommends that the City Council take the following actions. 1. Make a determination regarding the reconstruction of the boardwalk; 2. Award contract for the construction of the subject project having a scope of work and contract cost as defined by said action; 3. Approve a ten percent (�)I_ontingency for the project and authorize the City Manager to approve additional work, if required, for an amount not to exceed fifteen percent (15 %) of the contract price. 4. Authorize the Mayor to sign necessary contract documents. dl:co:ll highstAq wp51 is 2 Ex J i b i ,- A e ____________________________________________________________________________________ ________ _______________________ II CITY OF NOORPARY I Bidder 11 11 VENDOR 1 11 VENDOR 2 11 IIBid Results I-------------- I1----------------------- 11----------------------- 11------------------- - - - -11 it WINE: II IINIYI CONSTRUCTION IIHEW SEN. ENGINEERING 11 II Nigh Street IADDRFSS: 11 Engineer's Estimate 11 6016 FENIi00D IVE. 11 4845 N. SOUTH BIN RD. II IISidewalk Rehabilitation ICITY, STATE: II IlVoodland Bills CA 9136711P.0. BOY 7178 11 II and Stara Drains IPHONE NURSER: 11 11 18181 893 -5232 1101URD CA 93031 II 11 ICOITICT PERSOiI it 11 (885) 485 -98M II II Bid: 69- Har-92 11 ---------------------------------------- 1 11 ii II 11 IIITEN DESCRIPTION 11---------------------------------------- 11 ----------------------- Est Oty Unit II UNIT $ 1 II--------- II----------------------- TOTAL BID II UNIT $ 1 II ----------------------- TOTAL BID II UNIT $ 1 il TOTAL BID II I I 1 I Traffic Control I 1 1 LS I------------- 11 MAN 1 11--------- I------------- 2, 00. N 11 360.0 1 11--------- I--------- 3, 60.0 11 4615.N 1 - - - -11 4,615.N 11 11 2 1 Sidewalk II 1 I 7,M I SF 1 I 11 2.51 1 11 I 17, 5N. N 11 11 2.25 1 15,751.M 11 1.68 1 11, 2N.0 I I 11 3 1 Brim" 1 1,916 1 SF 11 3.58 1 6,716.0 11 I 2.51 1 II I 4,791.0 11 3.75 1 II 7,185.N 11 11 4 1 Curb i Gutter II I I 1 680 1 LF I 11 9.0 1 II I 6,121.N 11 II 11. N 1 7,481.0 it 8.71 1 5,916.0 II 11 5 1 Saw Cutting 1 1,121 1 LF II 1.11 1 1,232.0 II I 8.75 1 II i 841.0 11 1.51 1 II 561.0 11 11 6 1 H/C Ramps 1 11 I I I 252 1 SF 11 3.51 1 88281 11 3.75 1 945.0 11 2.81 1 514.* I I 11 7 1 Remove A/C 1 II I I 53 1 CT I 11 26.81 1 !I I 1,378.86 11 II 28.N 1 1,061.0 11 29.81 1 1, 537. N I I 11 8 1 Remove Curb /Gutterl 637 1 LF 11 5.51 1 3,513.58 II 1 3.25 1 !I I 2,171.25 11 3.41 1 II 2,165.89 11 11 9 1 Catch Basin #2 1 II I I 3 1 EA I 11 1824.0 1 II 1 5,472-W 112,50-89 1 II I 7, 581. N 111, 945.01 1 5,835. M 11 I 1 10 1 Saddle Connection 1 2 1 EA 11 850.81 1 1, 781.0 11 651.81 1 II I 1, 381. N 111, 221.81 1 II 2,449.80 11 I I 11 1 lal Dep #2 [CI 1 II I I 5 1 EA I 11 465.0 1 II I 2,325. N 11 II 475.81 1 I 2,375. N 11 716.N 1 3,586.n 11 II 12 1 18' RCP 1 83 1 LF II 47.0 1 3,901.06 11 47.31 1 11 I 3,925.91 11 69.N 1 11 5,727.N II 11 13 1 24' RCP 1 II I I 538 1 LF I 11 61M I II 1 33,356.0 11 it 51.25 1 21,834.51 11 55.21 1 29,697.61 11 11 14 1 33' RCP 1 492 1 LF II SIN 1 41,344.N it I 61.81 1 II I 29,913.61 11 61.51 1 II 29,766.N 11 11 15 1 Tree Root Barrier 1 11 1 1 581 1 LF 1 11 22-M 1 11 1 11, O/. N I 1 11 11. N I 1 5,111.0 11 1175 1 6,375.N 11 11 16 1 Catch Basin #3 1 2 1 EA 11 4052N 1 8,184.0 113,8N.N 1 11 1 7,60.89 112,441.0 1 11 4,890.0 11 11 17 1 Junction Structure! 11 1 1 2 1 EA 1 11 4243.0 1 II 1 8,48L N 11 II 751.0 1 1, 581. N 11 851.0 1 1,790.99 11 11 18 1 Haoboles 1 4 1 EI 11 265281 1 11,68L81 111, 1 725.81 1 11 1 6, 981.0 112, 511. N 1 II 11,111. N I I II 19 1 Asphalt 1 II I 1 413 1 Ton I II 44.0 1 II 1 18,172 0 11 ii 43.0 1 17,759.N 11 G&W I 26,845.11 II 11 28 1 6' Base 1 381 1 CT 11 33.0 1 9, 981.0 11 1 18. N I II I 5, 40.0 11 25.M 1 11 7, 581.0 11 II 21 1 Pavement Grinding 1 11 1 1 722 1 ST 1 11 2.96 1 11 1 1,444. N 11 11 3.38 1 1 2,38168 11 4.21 1 3,132.41 11 11 22 1 Crss gtter i Spadr1 1,140 1 SF 11 4.51 1 5,131.08 II 3.75 1 11 1 4,275.N 11 4.51 1 it 5,138.0 II II 23 1 Yellow Centerline 1 II 1 1 2,00 1 LF 1 11 1.42 1 11 1 80.86 11 11 0.77 1 1 1,546.N II 1.71 1 1,421.0 11 11 24 1 Ubite Prkng Stripes II i I 1,161 1 LF 1 11 0.42 1 11 I 487.28 11 11 1.41 1 I 11 1 464.86 11 1.38 1 11 I 11 348.0 11 II 11 25 1 Abandon Ctcb Besia l 2 1 EA 112, 081. N 1 4, ON. 0 11 730.0 1 1,466.00 11 591.0 1 1,18@.W I I 11 26 1 Relocate Gras Aeter l it I 1 1 1 EA ! 11 258.0 1 II 1 251.0 11 ii 561. N 1 I 560.0 11 581. N 1 11 581. N 11 I II it CM OF MOORPIRX I Bidder it 11 Bid Results 1--------------11---- 1,356.08 11 59.91 1 - - - - -- 11 Ina: 1 1 I LS 11 1. N I I 1 II 1--------- 11 11 High Street ADDRESS: II Engineez IlSidevaik Rehabilitation (CITY, S ?ATE: 11 II and Stan Drains IPHONE NUMBER: II !I ICONTACT PERSON II 11 Bid: 09- Mar -92 1 I = = == =_=wz= II 11 ---------------------------------------- IIITEM DESCRIPTION II ---------- Est Qty Unit II UNIT S 1 II---- - - - - -I 11---------------------------------------- 11 Z7 I Remove Striping ! 2000 I LF 11 1.66 1 11 28 1 Earthwork I 1 I IS 11 4671.08 1 II I I 11 29 1 Constr Surveying I I 1 I LS I I II 8508.08 1 II 31 1 Clearing /Grubbing 1 1 1 IS 11 148.08 1 11 31 1 1 1 II 1 11 31.1 Adjust Meter Box 1 it I i 11 1 EA I 11 IN. 08 I 11 I it 32 1 Adjst Man Bole Elvl 6 1 EI 11 311. N I 11 33 1 Adjst Valve Cvr Ell 11 ! 1 8 I EA 1 11 150.08 1 11 1 11 34 1 Remove E:stng Polel 7 1 EI 11 51.08 1 11 35 1 Yard Drain Asst 1 11 1 1 2 1 EI 1 11 235.08 1 II 1 11 36 1 Relocate Tel line 1 1 I LS 11 511.08 I 11 37 1 Temp I/C curb 1 II 1 1 51 1 LF 1 II 4.50 1 II 1 II 38 1 8' Crb A Etter 1 254 1 LF II 10.08 1 11 39 1 A/C Rolled Curb 1 61 1 LF II 4.50 1 1 II 1 1 11 46 1 1' Conduit t MosesI 1 1 1 LF 11 11 59N.N I 11 41 1 Unassigned I II I I I I 11 I II I 11 41 1 18'x18' Ctcb Basiol 1 1 Ea 11 51141.00 1 11 42 1 12' RCP 1 60 1 LF 11 35.08 1 II TENDLiR 1 ------------ II ------------------ IIMIXI COISTRUCTIO1 : Estimate I 1 6016 FENIOOD ITE. IIVoodland Hills CA II (818) 883-5232 II rxAl H 11 VEND1 2 11 ---- {- i------------------- - - - - II IIBERRY ®. EN6INEERIN6 II II 4045 I. SOUTH UK RD. II 9136711P.0. BOX 7178 11 11 OHM CI 93131 11 II 1815) 485-9626 it TOTAL BID II UNIT $ 1 TOTAL BID II UNIT 8 1 TOTAL BID II ------------ II--------- I------------- II--------- 1--------- - - - -11 3,2110. 81 11 1.86 1 3,728.01 11 1.79 1 3, 581.08 11 4,671. N Ilaa• *asaaaI 13,75/.08 117,463.0 1 7,463.08 11 11 1 II 1 11 8,500.1111 114, /11.1 1 4, 01/.1 114, MI. N 1 4,831.1141 11 14/.08 112,111.08 1 2,80.0 114,176.N 1 4,V6.N II 11 I I) I II 1, IN. N 11 75.08 1 825.0 11 26.1110 1 286.08 11 it 1 11 1 11 1, 808. N 11 275.08 1 1,659.1111 11 291. N 1 1,746.1141 11 1, 2N. N 11 171. N 1 1, 361.06 11 215.08 1 1,721.01 11 11 1 11 1 II 358.N 11 59.08 1 359.08 11 121.0 1 849.08 11 47@.W 11 208. N 1 408.08 11 452.91 1 984.08 11 it 1 11 1 II 5, 081.08 112, 311.88 1 2,3111. M I I 50.08 1 508.08 11 225.08 11 11.811 508.08 11 8.591 425.1111 11 II 1 11 1 II 2,56.01 11 13.N 1 3,312.0 11 9.651 2,451.11 11 274.51 11 15.08 1 915.08 11 11.111 677.11 11 II 1 II 1 11 5,110.91 112, 350.0 1 2,359.91 114, 23/.08 1 4,238.10 11 11 1 II I 11 11 1 II I it S08. N 11 5N.08 1 508.08 11 326.01 321.08 11 2.10.0 11 37.01 2.220. N 11 65.091 3.91110. 0 11 43 1 Remove Concrete 1 151 CY 11 26.00 1 390.08 11 91.08 1 1,356.08 11 59.91 1 885.86 II 45 1 Release I 1 1 I LS 11 1. N I I 1 II 1--------- 1. N 11 1. N I - - 1--------- MW 11 1.061 1.611 11 I BASE BID TOLL I I 1 11 1 1 I II 1 - -11 242,311.21 11 1 11 I - - - -11 1--------- 284,917.85 11 1 II I - - - -II 217,668.08 II II I I Bid ALternate 1 I II I I 1 II 1 II I II 1 11 I II I II II I = = == =_=wz= I 1 11 1 11 1 11 I I I 481 Remove Brdvlk I 1 1 LS 11 1708.08 1 1, 708.08 11 1 2, 200.0 112,851. N 1 2,851.0 11 49 1 Constr Brdvlk 1 1 1 1 IS 11 2508.08 1 I 1 11 1--------- 2,508.00 II 1 - - - -11 1--------- 8,280.08 1laaaaaaaaal - - - -II i--------- 11,3N.N II - - - -11 I Total 448 i 849 1 -------------------------------------- 1 1 11 1 I I II 1 II--------- 1=====___===== 4,2W. 91 11 1 II 1 II--------- 1=====___=== 1/, 41.08 11 1 11 1 == 11--------- 14,151. N I I it 1! I Total 111 II I 246,511.26 11 1 == II 1 215,317.85 11 === ___= = = = =11 it 231,818.08 11 132 II CITY OF MOOR M I Bidder 11 VEMM 3 II VEEN 4 II VEIDOB 5 11 liBid Results 1-------------- 11----------------------- II----------------------- II------------------- - - - -II 11 Inn: I I J i H OGINEERIIG I IV. MURDOCR i J. MY I I C. A. RASMIi M I I II High Street IADDRFSS: II 79 DAILY DRIVE #169 11 1617 S. FAIR OM AM 11 2360 SHASTA WAY II IISidewalk Rehabilitation (CITY, STATE: IICIIARILLO CA 93010 11 # 361 11 sill VALLEY CA 9316511 11 and Store Drains IPBONE MUMBER: 11 (865) 987 8414 IIPASIDM CA 91983 11 11 11 1CONTACT PERM II 11 (818) 799 -9862 11 (805) 577-9330 11 II Bid: 09- bar -92 1 11 ---------------------------------------- 11 11 II II IIITEM DESCRIPTION II---------------------------------------- il ----------------------- Est Qty UnitlI UNIT $ 1 il ----------------------- 11 ----------------------- TOTAL BID II UNIT 8 1 TOTAL BID II UNIT 6 1 11 TOTAL BID 11 II 1 I Traffic Control I 1 1 IS il --------- I II 6060.N 1 ------------- II --------- I ------------- 6,000.01 11 3000.N 1 11 --------- I ------------- 3,000.0 11 311.91 I II 3,000.N II 11 2 1 Sidewalk 1 11 1 7,606 1 SF 11 1.91 1 13,370.00 II 2.30 1 16,191.91 11 2.75 1 19,250.0 11 1 11 3 1 Driveway 1 1 1,9161 SF 11 1 11 3.01 1 II 1 5,748.1 11 3.50 1 11 1 6,706.1 II 4.651 11 8,909.40 11 11 4 1 Curb A Getter 1 II 1 691 1 LF 1 11 10.01 1 II 1 6,801.0 11 13.N 1 11 1 8, 841. N 11 11.451 11 1 7,71L N 1 I II .1 11 5 1 Saw Cutting 1 1,1291 LF 11 3.01 1 3,366.1 II 1.91 1 1,121.1 11 1.791 1,964.1 II 11 6 1 B/C Ramps 1 II I I 2521 SF 11 3.01 756.0 11 5.01 1 1, 260. N 11 4.75 1 1,197. N I I 11 7 1 Remove A/C 1 11 1 I 531 CY 1 11 50.01 1 11 1 2,650.1 II 31.01 1 11 1 1,591.0 II 44.75 1 II 1 2,371.75 11 11 11 8 1 Remove Curb /Gutters 637 1 LF II 7.N 1 4,459.1 11 1& 1 1 6,370. N 11 7.80 1 4,968.60 II 11 9 1 Catch Basin #2 1 II I i 3 1 EA I 11 3651.01 II I 18,950.01 11 3200. N 1 II I 9, 601.91 112, 910. N 1 II I 8, 701. N I I II I 1 19 1 Saddle Connection 1 2 1 EA 11 459.861 9N. 01 11 6601.01 1 12, 90. N 11 9N. N 1 1, 8N. N 11 11 11 1 Ld Dep #2 10 1 11 l I 5 1 EA 1 11 838.91 1 II 1 4,190.0 11 1261.N 1 it 1 6,000.0 11 816.91 1 II 1 4,050.N 11 11 11 121 18' RCP 1 83 1 LF 11 80.001 6,601.0 11 91.01 1 7,478.011 11 61.01 1 4,9M. N 11 11 13 1 24' RCP 1 11 1 1 538 1 LF 1 11 MM 1 it 1 37,66@.N 11 46.0 1 11 1 24,748.08 11 62. N 1 11 1 33, 356.0 11 II 11 14 1 33' RCP 1 4921 LF 11 74.0 1 36,408.0 11 55-091 27,060.1 11 65.01 1 31,989.91 11 11 15 1 Tree Root Barrier 1 II 1 501 1 LF 11 5.N 1 2,501.611 11 6.1 1 3,10.0 11 13.50 1 6,759.01 11 1 11 16 1 Catch Basin #3 1 1 2 1 EA II 1 11 3833.01 1 II 1 7, 666.0 1 1 4801.0 1 11 1 8, 000. N 113, 801.0 1 11 7, 601.0 11 11 17 1 Junction Structurel 11 1 1 2 1 EA 1 11 160.891 11 1 3,21110. 0 11 15N.89 1 11 1 3, 010. N 112, 801.0 1 II 1 5, 6N. N 11 II 11 18 1 Manholes 1 4 1 EA 11 2801. N 1 11, 200. N 11 2201.01 1 8, 801.1 113,201.0 1 12, 801. N 11 11 191 ispialt 1 4131 Tam 11 29.50 1 12,183.50 11 52.01 21,47& M 11 C611 1 6105.0 of I 1 I it M it ti ii 4 11 291 6' Base 1 3N 1 CT 11 15. N 1 4, 501.0 11 25.061 7, 50. N 11 23.661 7, 001. N 11 11 21 1 Pavement Grinding 1 722 1 ST 11 5.06 1 1 3,653.32 11 7.1 1 it 1 5,054.0 11 5.1 1 11 1 3,610.N 11 II 11 1 1 II 22 1 Cras fitter i Spodr1 1 1,146 1 SF II 11 5.181 5,814.0 II 6.01 1 6,841.1 11 7.80 1 8,892.01 11 11 23 1 Yellow Centerline 1 II 1 I 2, 010 I LF 1 11 9.701 11 1 1, 4N. 91 11 1.1 1 11 1 2, 001. N 11 0.95 1 11 1 1, 901. N 11 II 11 24 1 White Prksg Stripel II 1,160 I LF 11 0.30 1 348.91 11 0.50 1 580.0 II 0.56 1 649.60 11 I 1 11 25 1 Abandon Ctch Basis I I 2 1 EA II 1 11 259.09 1 II I 5N. N 111, 091. N 1 II I 7,011.9111 111, 350. N 1 II 2, 701. N 11 II 261 Relocate Gas Meters II I I 1 I EA 1 11 351.0 1 II I 351.N II 1001.01 1 11 I 1,001.01 II 0.N I II i 1.N 11 1) FxtI4, � A II CITY OF MOORPARK 1 Bidder 11 VENDOR 3 II VENDOR 4 11 VENDOR 5 11 IIBid Results i -------------- II ----------------------- II ----------------------- II ------------------- - - - - II II Ina: I13 i B ENGIREERIB6 IIV. HURDOCI i J. MCCOT IIC.A. RASRUSSER II II High Street IADDRESS: 11 79 DAILY DRIVE #169 If 1617 S. FAIR OAKS 1VE.11 2360 SHASTA VAT II IISidevalt Rehabilitation ICITY, STATE: IICAMIRILLO CA 93018 11 # 301 IISIII VALLET C1 9316511 II and Stara Drains IPHONE KIRIBER: II (865) 987 8114 IIPASADEN/ CA 91983 11 11 it 1CONTACT PEBSOHI1 11 (818) 799 -9882 11 (815) 527 -9331 If 11 Bid: 09- Mar -92 1 II 11 11 it 11---------------------------------------- IIITEI DESCRIPTION II---------------------------------------- Est Oty 11----------------------- UnitlI UNIT $ 1 II--------- I------------- 11----------------------- TOTAL BID II UNIT 8 1 11------------------- TOTAL BID II UIIT $ 1 - - - -11 TOTAL BID II 11 27 1 Remove Striping 1 2860 1 LF I I 1. N 1 II--------- I------------- 2,111.N 11 1.86 1 II--------- I--------- 3,721.86 11 1.35 1 - - - -II 2, 706. N 11 11 28 1 Earthwork 1 11 1 1 1 1 LS 1 11 59N.0 1 11 1 5, 90.81 I l aaaasaaaa ( II 1 13, 758.0 112, 281.0 1 11 1 2, 216.0 11 11 11 29 1 Cooetr Sia veying 1 1 1 LS 11 5588.0 1 5,5M. N 114, BN. 0 1 4, 606. N 114, 258.0 ( 4,256.0 11 11 38 1 Clearing /Grubbing I 1 I LS 11 7800.0 1 7, 068. N 112, 088. N 1 2, 006.0 114,50.0 1 4,50.0 11 11 31 1 1 1 11 1 11 1 II 1 II 11 31 1 Adjust Teter Box 1 11 1 1 11 1 EA 1 11 75.0 1 11 1 825.0 11 75. N 1 11 1 825.0 11 195.06 1 II 2,145.81 II 11 32 1 Ad jet Ian Bole Elv l 6 1 EA 11 275.0 1 1, 658. N 11 775.N 1 1 1, 658. N 11 306.0 1 11 1, S0. N I i 11 33 1 Ad jet Valve Cvr Ell II I i 8 1 EA I 11 158.0 1 11 I 1, 261. N 11 178.81 1 II I 1, 360. N 11 225.N 1 II 1, M. N I I 11 34 1 Remove Esetmg Polel 7 1 E1 11 156.0 1 1,856.0 11 56.0 1 1 350.0 II 25.0 1 II 175.0 11 11 35 1 Yard Drain "" 1 II 1 I 2 1 EA I 11 258.08 1 II 1 5N.0 11 281. N 1 11 1 4111111.06 11 568.0 1 11 I 1,128.0 11 11 36 1 Relocate Tel line I i I LS I 1 18111. N 1 i, 011.0 112, 3N. N 1 2, 306.81 11 6.0 1 II 9.011 11 37 1 Temp 1/C curb 1 II 1 1 51 1 LF 1 11 18.01 II 1 506.0 11 18.08 1 11 506.81 If 13.56 1 675. N 11 11 38 1 8' Crb t fitter 1 254 1 LF 11 11.18 1 1 2,819.40 11 13.0 1 it 1 3,382.0 11 13.561 11 3,429.89 11 II 39 1 A/C Rolled Curb 1 If I I 61 1 LF I 11 18.0 1 If 1 610.0 11 MIMI 1 11 1 915.00 11 13.58 1 823.58 11 11 48 1 1' Conduit i Boxed 1 1 LF 11 580.81 1 5,101.8111 112, 358. N 1 11 1 2, 356.81 112, 8N. N 1 11 2,8W. 86 11 11 41 1 Unassigned I II I I I 1 II I II 1 II I If I II 1 II II 11 41 1 18148' Ctcb Basia I 1 I Ea 11 750.81 1 758.1111 11 50.0 1 1 506. N 111, 656.0 1 it 1, 651. N I I 11 42 1 12' RCP 1 66 1 LF 11 45.0 1 2, 706.0 11 37.0 1 2,221.0 11 58.0 1 3, 486. N 11 11 43 1 Remove Concrete 1 15 1 CY 11 3111.M 1 451.W 11 98.0 1 1,359.0 11 6B. N 1 1, 626. N I 1 11 45 1 Release I II 1 1 1 I LS 1 I 1 1.06 1 II 1--------- 1.0 11 1.4111111 - - - -11 1.0 11 1.11101 1.111111 11 II 1 BASE BID TOTAL I II I I 1 I II 1 II I 1--------- 233,461.22 11 1 I{ 1 - - - -II I--------- 242,667.0 11 1 II I - - - -11 261,517.85 II II II i I 11 1 Bid 1Lternate I I I II I II I II I II 1 If I II I II II 11 48 1 Remove Brdvlk I 1 I IS 11 330.06 1 3, 306. N 113,50.0 1 3, 506.0 111, 8N. N 1 1,881.0 11 11 491 Cosstr Brdvlk I 11 1 1 1 I IS 1 11 880.06 1 11 1--------- 8, 806. N 117, 5N. N 1 - - - -II 1--------- 7, 506.0 114, 506.06 1 - - - -11 1--------- 4,5M. W 11 - - 11 1 Total #48 9 #49 1 1 11 1 12, 10. N I I 1 11, 811.0 11 1 - -11 (430111.41111 11 132 11 CITY OF HDORPARH I Bidder 11 YE/DUR 6 II VEIDOR 7 11 VEIDOR 8 II 1{ Bid Hemalte I-------------- II----------------------- II----------------------- II------------------- - - - -11 11 I UKE: I I A-C COISTRUCTIOH I I BLOIS I I WI01 EII GIMERIIG I I II High Street 1#DDRESS: II 4875 SPRING RD II 3373 VENTURA RD II 3658 I. VENTURI BLVD. 11 IISidewalk Rehabilitation ICITY, STATE: 11HOORPARY CA 93021 IIVEITURA CA 93865 11VEHTURA CA 93861 II II and Storm Drains IPHORE HUMBER: II (805) 529 -3220 11 (815) 656 -1432 II (885) 648 -3373 II 11 ICOITACT PERSO111 II it II 11 Bid: 09- Mar -92 11---------------------------------------- 1 11 11 I{ II IIITEH DESCRIPTION II---------------------------------------- 11----------------------- Est oty Omit II UNIT $ 1 II----------------------- TOTAL BID it UNIT 8 1 II------------------- TOTAL BID II UNIT 9 1 - - - -II TOTAL BID II 11 1 I Traffic Control I 1 I IS 11--------- I------------- II 5750.00 1 11--------- I------------- 5,750.86 11 4000.86 1 11--------- 1--------- 4,000.00 1121628.N 1 - - - -11 21,620.00 II 11 2 1 Sidewalk it 1 1 7,562 1 SF 1 1 II 1.88 1 11 1 13, 16L N it 11 2.N 1 1 14,000. N II 2.14 1 14,980.N 11 11 3 1 Driveway 1 1,112 1 SF 11 3.15 1 6,035.48 II 2.30 1 11 4,486.80 11 1 2.38 1 II 4,568.88 II II 4 1 Curb i Batter II 1 788 1 LF I 1 II 9.89 1 11 I 6,725.20 II II 10.40 1 I 7,072.86 I 12.N 1 8,160.N II .I 11 5 1 Saw Cutting 1 1,124 1 LF II 8.74 1 828.88 11 0.88 1 11 8%.N I 1 1.10 1 II 1,232.N 11 11 6 1 H/C Rempe 1 252 1 SF 11 3.33 1 839.16 11 3.50 1 882.86 11 3.50 1 882.N 11 11 7 1 Remove A/C 11 1 1 17 1 CY 1 1 11 54.88 1 11 1 2,988.64 II II 150.86 1 1 7,950.91 II II 31. N 1 1,643.01 11 11 8 1 Remove Curb /Gutterl 577 1 LF II 5.65 1 3,599.05 II 5.86 1 3,185.N II 1 2.N 1 11 1,274.N II it 9 1 Catch Basin #2 11 1 1 3 1 E• 1 1 11 2990.86 1 11 1 8,978.09 112,750.0 1 II 1 8,258.06 112,635.0 1 11 7,916.0 11 11 l0 1 Junction Bo: 1 3 1 EA 11 575.91 1 1,158.80 11 7N.88 1 1, 486.86 11 1 476. N I 11 952. N 11 11 11 1 Lcl Dep #2 10 II 1 I 1 5 1 EA 1 it 379.56 1 II I 1,897.56 11 II 250.86 1 I 1,250.86 11 II 364.86 1 1,820.0 11 II 12 1 18' RCP 1 83 1 LF 11 63.25 1 5,249.75 II 78.38 1 6,498.91 11 I 51.86 1 II 4,233.N II 11 13 1 24' RCP 1 11 1 1 538 1 LF 1 11 63.25 1 11 1 34,828.50 11 11 57.W 1 1 314 666. N 11 59. N 1 31,742.N 11 II 14 1 33912 1 492 1 LF 11 74.75 1 36,777.N 11 59.60 1 11 29,323.20 11 1 62.86 1 II 31,504. N II II 15 1 Tree Root Barrier 1 11 1 1 5N 1 LF 1 11 7.76 1 II 1 3,886 -89 it 11 45.86 1 1 22,580. N 11 11.41 1 5,785.N 11 11 16 1 Catch Basin #3 1 2 1 EA 11 3228. N I 6,44L N 113, 7N. N 1 II 1 7, 480. N 113, 644.86 1 II 7, 288. N I i II 17 1 Junction Structurel II 1 1 2 1 EA 1 11 2070. N 1 it 1 4,148. N 111,380.06 1 2,60.0 11 477.N 1 954.N it II 18 1 Hanholes 1 4 1 EA II 1840. N 1 II 1 7,360. N 112,220.86 1 II 1 8,8N.N 113,195.N 1 11 12,788.0 11 II 19 1 Asphalt 1 II I I 3 1 Ton I II 49.34 1 II I 28,377.42 11 11 97.50 1 I 48,267.50 it 62.0 1 25,606. N II II 21 1 6' Base 1 19 1 CY II 31.55 1 9,465.N it 79.46 1 II 23,820.86 II I 40.86 1 II 12, ON. 86 I II 21 1 Pavement Grinding I 11 1 1 1,833 1 ST 1 II 6.14 1 11 1 4,433.18 11 II 3.29 1 1 2,375.38 it 4.89 1 3,538.58 II 11 22 1 Crss fitter i Spndrl 840 1 SF II 4.% 1 5,654.46 11 4.58 1 II 5,138. N II 1 3.56 1 11 4,881.28 11 11 23 1 Yellow Centerline 1 11 1 1 2,111 1 LF 1 11 6.77 1 II 1 1, 548. N I I 11 0.73 1 1 1, 468. N 11 II 6.75 1 1, 5N. N 11 11 24 1 Mite Prkng Stripel 11 1 1 1,634 1 LF 1 11 8.29 1 11 336.41 II 8.29 1 336.41 II 1 0.40 1 11 464.N 11 11 25 1 Abandon Ctch Basin l 2 1 EA 1 11 575.86 1 II 1,151.09 11 1 586.86 1 II 1,10/.86 I I 1 629.16 I II 1, 258. N I I 11 26 1 Relocate Gas Meter 1 1 I EA 11 115.86 1 it I 115. N 11 II 3N. N 1 I 3M.0 11 II 818. N 1 I 818.N 11 II II I I I ---------------------------------- - - -- -- --- -- - - - - -- - - - - - -- f KA &, -V A II CITY OF MDORPIRK 1 Bidder ------------------------------------------ 11 VENDOR 6 11 VENDOR 7 11 VENDOR 8 II 11 Bid Results I-------------- II----------------------- II----------------------- II---- -------------- - - - -II II INANE: II► -C CONSTRUCTION IIBLOIS IIUNION ENGINEERING II II High Street (ADDRESS: 11 4875 SPRING RD 11 3373 VENTURA RD II 3658 N. VENTURA BLVD. II IISidewalk Rehabilitation ICITY, STITE: IIMOWIRN CA 93121 (IVEMMA CA 93195 11 VENTURA CI 93101 11 II and Store Drains IPBONE NUMBER: 11 (885) 529 -3228 11 (815) 656 -1432 II (815) 648-3373 11 II (CONTACT PERSON II 11 11 II 11 Bid: 09- Mar-92 1 11---------------------------------------- 11 it (1 II IIITEN DESCRIPTION II---------------------------------------- Est Qty 11-----------------------( UnitlI UNIT 8 1 II--------- I------------- 1----------------------- TOTAL BID II UNIT 8 1 II------------------- TOTAL BID II UNIT $ 1 - - - -II TOTAL BID II 11 27 1 Remove Striping I 2101 1 LF 11 1.94 1 II--------- I------------- 3,880.99 II 1.86 1 II--------- I--------- 3,721.68 11 1.93 1 - - - -II 3,861.(1 it 11 28 1 Earthwork I II 1 1 1 I IS 1 II 7599.01 1 it 1 7,590.01 118,919.91 I II 8,010.01 II + ++ + + +sa +) 16,444.06 11 II 29 1 Cmstr &wnying 1 1 1 IS 11 4945.11 1 1 4,945.00 114,181.11 1 II 1 4,189.09 114,329.00 1 11 4,329.11 II II 31 I Clearing /Grubbing I 11 ' 1 1 I I LS 1 II 2991.46 1 11 1 2,991.46 118,111.11 I 11 1 8,111.11 116,277.0 1 11 6,277.10 11 11 31 1 Adjust Meter Has 1 II 1 1 8 1 Ek 1 11 172.59 1 II 1 1,897.59 11 95.01 1 II 1 1 1,645.01 11 117.01 1 II 1,177.06 11 II 32 1 Adjst In Hole Elvl 1 1 EA II 291.25 1 1,217.51 II 275.01 1 II 1 1,651.00 11 346.01 1 11 2,176.11 11 11 33 1 Idjst Valve Cvr Ell II 1 1 5 1 EA 1 II 115.00 1 II 1 921.90 11 185.11 1 11 1 1,481.11 II 283.00 1 it 1 2,264.11 11 11 34 1 Remove Exstog Polel 2 1 EA II 231.06 1 1,619.00 II 75.10 I 525.11 11 94.01 1 II 658.11 it II 35 1 Yard Drain Assn 1 11 1 1 2 1 EI 1 11 921.00 1 11 1 1,849.99 11 361.01 1 II 1 720.91 II 517.01 1 II 1 1,914.01 II 11 36 1 Relocate Tel line 1 1 I IS II 1150.90 1 1,150.11 11 311.91 1 310.01 111,875.91 1 11 1,875.00 11 II 37 1 Temp I/C curb 1 (I I I 51 1 LF I 11 15.57 1 II I 778.51 11 22.49 1 1,129.01 II 10.91 1 500.10 11 II 38 1 8' CA i Etter 1 254 1 LF 11 9.89 1 II I 2,512.16 1f 19.61 1 11 I 2,692.49 11 13.11 1 II 3,312./1 II 11 39 1 k/C Rolled Curb 1 II 1 I 61 1 LF I 11 22.13 1 II 1 1,349.93 11 14.51 1 II 884.51 it L IN I 488.01 II II 49 1 1' Conduit i Hosed 1 1 LF 11 5521.91 1 I 5,521.10 11 +s + + +++ + +1 11 I 12,640.01 114,512.01 1 11 4,512.90 II 11 44 1 Unassigned I it I I 1 I 11 I 11 I II 1 it i II II 41 1 180zi8' Ctch Basial 1 I Em 11 1389./1 1 II I 1,381.00 it 475.00 1 II i 475.11 II 734.11 1 II 734.91 II 11 42 1 12' RCP 1 61 1 LF 11 74.75 1 4,485.01 11 89.01 1 4,891.91 II 47.10 1 2,821.11 II 11 43 1 Remove Concrete 1 151 CT 11 54.88 1 82129 11 75.11 1 1,125.91 11 32.91 1 481.11 11 II 44 1 Relesse I 11 1 1 1 I LS 1 II 1.0 1 II 1-------- 1.00 11 1.11 1 - -- - 1.01 11 1.00 1 1.11 II II 1 BASE BID TOTAL I II I 1 I 1 11 1 II I -II 1--------- 237,691.45 II 1 II I - - - -II 1--------- 289,217.98 11 1 II I - - - -II 269,312.86 II II II I I 11 I Bid ILternate I 1 1 II I 11 I II 1 II i it I II 1 II II II 48 1 Remove Brdvlk 1 1 1 IS 11 7139.91 1 7,139.86 112,910.00 1 2,911.0/ 112,961.91 1 2,961.11 II 11 49 1 Constr Drdwlk I 11 1 1 1 I IS 1 II 7131.00 1 II 1--------- 7,131.01 117,319.00 1 1--------- 7,311.11 118,877.0 1 8,877.00 II II 1 Total 948 i 449 1 II I I 11---------------------------------------- 1 I II 1 II I 11--------- 1=====___===== - - - -11 14,261.90 11 1 II I II--------- 1=====___== - - - -II 1--------- 11,221./1 II 1 II I === ii--------- - - - -11 11,837.11 II II li I I Total 1( I 11111UM 1 II I 251, 950.45 11 Y%IDI10 111 II I 299, 427.18 I I ><YYY> EM I II 272,139.86 11 132 F)(A,- 1' 1 t A II CITY OF MOORPARI I Bidder II VENDOR 9 11 OEMDOR 16 11 PENOR 11 it IIBid Results I-------------- II----------------------- II----------------------- II------------------- - - - -II I I Ina: I I PAYME E3IG11ERI11G I I R i R PAYING 1 I TIMOTMT J. FERRIS I I I I Nigh Street IIDDRESS: 11 7145 FIRST STREET 11 1497 LOS ANGELES HE 11 411 1ORTB YEI1TIIRA ST. I I IISidewalk Rehabilitation (CITY, STATE: II:RIITE 1117 11SATICOY CA 93014 IIOJII CA 931M II 11 and Store Drains IPBONE MUIMM: IISIMI VALLEY CA 93165 11 11 11 II 1CONTACT PERSNii (815) 581 -9159 II (885) 647 -3286 11 (815) 646 -1159 11 II Bid: 19-Mar -92 II---------------------------------------- 1 II If it II IIITEN DESCRIPTION 11---------------------------------------- 11----------------------- Est Qty Unit II UNIT 6 1 11--------- I------------- II----------------------- TOTAL BID it UNIT $ 1 II------------------- TOTAL BID II UNIT 8 1 - - - -II TOTAL MID II i I 1 I Traffic Control 1 1 I IS 11 5201.0 1 11--------- I------------- 5,2N. N 1111810.0 1 II--------- I--------- 11,01.81 11 5111.0 1 - - - -11 5,M.86 11 II 2 1 Sidewalk 11 1 1 1 7,562 1 SF 1 II 1.54 1 II 1 19,788.N 11 2.25 1 11 15,750. N II 2.58 1 17,5N.0 it 11 3 1 Driveway 1 1,112 1 SF II 2.64 1 1 5,858.24 11 3.68 1 II 6,897.61 11 1 5.51 1 it 19,53L N II 11 4 1 Curb i Gutter 1 11 1 1 780 1 LF 1 11 9.38 1 11 1 6,324.86 II 15.51 1 it 19,548.N II 18.0 1 12,246.0 11 11 5 1 Saw Cutting 1 1,124 1 LF 11 1.46 1 1 1,56& N II 1.0 1 11 1,121. N II 1 8.35 1 11 392.01 II 11 6 1 N/C Rasps 1 252 1 SF 11 2.71 1 60.48 If 4.50 1 1,134.86 11 7.01 1 1,764.01 11 11 7 1 Remove 11C 1 II 1 I 17 1 CY 1 11 89.01 1 II I 4,248-09 11 17.01 1 II I 901.0 11 75.01 1 3, 975.01 I I II 8 1 Remove Curb/Gutterl 577 1 LF II 3.91 1 2,484.31 11 3.75 1 II 2,388.75 11 I 6.01 1 II 3,822. N II 11 9 1 Catch Basin #2 1 11 1 1 3 1 EA 1 11 22N.0 1 11 1 6, 841. N 113, 301. N 1 II 1 9,9N.86 114 2N. N 1 6, 601. N 11 11 N I Junction Box 1 3 1 EA 11 651.0 1 1, 3N. 0 11 501.0 1 11 1, 888.0 11 1 IN. 0 1 II 211. N If 11 11 1 Lcl Dep #2 IC) 1 11 1 1 5 1 U 1 11 251.811 II 1 1, 251.01 111,14N. 0 1 11 1 5, 5N. 0 11 801.0 1 4,10.0 11 11 12 1 18' RCP 1 83 1 LF 11 65.0 1 5,395.41111 11 71.0 1 11 5, 893. N 11 1 54.0 1 11 4,481 N I I 11 13 1 24' RCP 1 II 1 1 538 1 LF 1 11 67. N 1 II 1 36, 846.0 11 61.591 11 1 33,187.01 11 62.0 1 33,356. N I i 11 14 1 33' RCP 1 492 1 LF 11 75.01 36,9011. 80 11 64.511 it 31,734. N 11 1 75.01 11 36,9N. 86 11 11 15 1 Tree Root Barrier 1 11 I I 5N 1 LF I 11 16. N 1 11 I 8,011.86 11 13.0 1 II I 6, 501. N 11 4.011 1 2, 881.0 11 11 16 1 Catch Basin #3 1 2 1 EA 11 3728.01 1 7,449.0 114, 50. N 1 II I 9, IN. 0 113,111.0 1 11 6,1111.0 11 11 17 1 Junction Stractore I 11 1 1 2 1 EA 1 11 2648.01 1 11 1 5,289.1111 111,158.N 1 If 1 2,31141-89 111, 801.01 1 2, 811. N 11 11 18 1 Manholes 1 4 1 EA 11 2766.01 11, 848.0 113, 801. N 1 11 1 12, 801.01 1 12,101.01 1 11 8, 401. N 11 II 19 1 Asphalt 1 II 1 1 3 1 Ton 1 II 68.35 1 II 1 28,228.55 11 48.0 1 If 1 16,521.n II II 68. N 1 28,184. N II 11 21 1 6' Base 1 19 1 CY 11 56-621 16, 986.0 11 26. N I 7, 80.0 11 1 45.01 1 11 13,50L N I I 11 21 1 Pavement Grinding 1 11 1 1 1,833 1 ST 1 II 4.861 If 1 2,888.89 11 3.21 1 II 1 2,311.41 11 4.01 1 2,888.09 11 11 22 1 Crss fitter t Spndrl 8461 SF 11 3.95 1 4,513.01 II 5.38 1 11 6,84188 If 1 7.N 1 11 7,988.00 11 11 23 1 Yellow Centerline I 11 1 1 2,M I LF 1 11 8.98 1 11 1 1,011.0 11 0.761 II 1 1,526.98 11 8.71 1 1, 4N. N 11 11 24 1 Mite Prkog Stripel II 1 1 1,034 1 LF 1 it 8.68 1 11 696. N II 9.361 11 348. N II 1 1.31 I 11 348. N II 11 25 1 Abandon Ctcb Basia I 2 1 EA 1 11 893.N 1 11 1 1,786.n If 801.0 1 11 1, 6N. 0 11 1 121.0 1 11 246.1111 11 II 261 Relocate Gas Meters II 1 I 1 I EA 1 II 161.011 II I 168.08 II 0.01 it I 11.1111 II 11 360.N 1 1 368.01 11 11 --------------- - ----- - - - - -- - - - -- - - - - -- -- -- - - - - -- - - -- - - - - - -- II CITY W NOORPARL I Bidder 11 VENDOR 9 11 VENDOR 19 11 VENDOR 11 11 IIBid Results I -------------- { 1 ----------------------- il ----------------------- II ----------------------- 11 I I I URE: I I PATH ENGINEERING 112 i N PAVING I I TIINITRY J. FERRIE I I II Nigh Street IADDRESS: 11 2245 FIRST STREET 11 1497 LOS ANGELES AVE 11 411 NONTB VENIIRA ST. II IISidewalk Rehabilitation ICITY, STATE: IISUITE 117 IISATICOY CA 9384 IIOJAI CA 93123 II 11 and Store Drains IPI NE NUMBER: IISINI VALLEY CA 93165 11 11 II If ICONTACT PERSON II (815) 581 -9159 11 (805) 647 -3286 11 (816) 646 -1159 it it Bid: 19- Mar -92 1 11---------------------------------------- 11 II 11 11 IIITEN DESCRIPTION 11---------------------------------------- Est Qty 11----------------------- Unit II UNIT 6 1 11--------- I------------- II----------------------- TOTAL BID it UNIT S I 11--------- 11------------------- TOTAL BID II UNIT $ 1 - - - -11 TOTAL BID II 11 27 1 Remove Striping 1 281 1 LF 11 1.49 1 1------------- 2,88.8 11 1.91 1 II--------- I--------- 3,80. 01 11 1.70 1 - - - -II 3, 411. N 1 I 11 28 1 Earthwork I 11 I 1 1 I LS I 1135631. N 1 II I 35, 630.8 113, 000.0 1 II I 3,18.8 117,1111C9111 1 II I 7, 081. N I I II 11 29 1 Coostr Surveying I 1 I LS 11 4726.01 I 41,73611111 114, 3N. N 1 4, 311. N 113, iN. N 1 3, 1N. N I I 11 31 1 Clearing /Grubbiag I it 1 1 1 I LS 1 II 275/.N 1 11 1 2,750.0 112,711.8 1 11 1 2,70.0 117,641.8 1 11 7,641.8 11 11 31 1 Adjust Beter Box 1 II 1 1 8 1 EA I 11 59. ft 1 II I 551.0 11 161. N 1 II 1 1,768.0 11 55.N 1 11 615. N I I 11 32 1 Adjst In Role Elvl 1 I EA 11 325.N 1 I 1,95& 0 11 391.0 1 II i 2,341.0 11 260. N 1 II 1,561.81 11 11 33 1 Ad jot Valve Cvr Ell it 1 I 5 1 EA 1 11 51.0 1 II I 4N. N 11 225.81 1 II I 1, M. N 11 21L OO 1 II I 1, 681. N I I 11 34 1 Remove Mm* Pole I 2 1 EA 11 75.0 1 525.N 11 481.0 I 2, 881. N 11 1. N 1 I 1.8 11 11 35 1 Yard Drain Amy 1 11 I 1 2 1 EA 1 11 161.0 1 11 I 322.N 11 590.8 1 it I 1, 810. N 11 258.W 1 II 581.0 11 11 36 1 Relocate Tel line I 1 1 LS 11 280.01 1 2, M. 0 11 @.N 1 I 6.0 11 311. N 1 11 3N. ft 11 11 37 1 Temp A/C curb 1 11 1 1 591 LF 1 11 6.N 1 11 1 3M.48 11 5.8 1 11 1 25@.W 11 10. N 1 5N. N 11 11 38 1 8' Crb i fitter 1 254 1 LF 11 10.28 1 2,591.89 11 15. N 1 11 1 3, 811. N 11 20.N 1 11 5,181. N I I 11 39 1 A/C Rolled Curb 1 11 1 1 61 1 LF 1 11 12.N 1 11 1 732.8 11 7.W 1 11 1 427.8 11 10.09 1 11 61@.W 11 II 40 1 1' Conduit i Boxesl 1 I LF II 4938.N 1 4,938.8 Ilffffiif *fi 1 19,58.N 113,IN.N 1 11 3, IN. N II 11 44 1 Unassigned I II I I 1 1 II I II i II II I 11 41 1 18'x18' Ctcb Basin I 1 I Ea 11 621.8 1 620.8 11 756. N 1 it 1 751.8 11 699. N 1 it 681. N 11 11 42 1 12' RCP 1 60 1 LF 11 61.52 1 3,691.28 11 80.0 1 4, 881. N 11 43.8 1 2, 581.0 11 11 43 1 Remove Concrete { 15 1 CT 11 75.86 1 1,125. N 11 35. N 1 525.0 11 161.0 1 2, 4N. N 11 11 44 1 Release 1 II I 1 1 1 LS I 11 1.8 1 it 1--------- 1.81 11 1.8 1 - - - 1." 11 1.0 1 1. N 11 II I BASE BID TOTAL I II I 1 I I 11 1 II 1 -II I--------- 278,524.49 11 1 11 1 - - - -II I --------- 247,348.75 11 1 II I - - - - II 254,625.N II II it I i II I Bid Alternate I I I II 1 II 1 it i II I it I 11 I II II 11 48 1 Remove Brdwik I 1 I LS 11 4660. N 1 4, 661. N 114,5N.09 1 4, 5N. N 113,5W.81 1 3,50. N I I 11 49 1 Constr Brdvlk I it 1 1 1 I LS 1 1112769.N 1 11 1- -------- 12,766.8 IIG,5N.N 1 -- - -11 1--------- 6,500.0 II•••••••••I - - - -II I--------- 11,5N.N 11 - - - -11 11 1 Total #48 i #49 1 1 11 1 17,42@.N 11 1 11, 810.8 11 1 15, 011. N 11 Total IIXMMMI 295,944.49 IIMM=I 258,34L75 11 1 269,625.N 1-.