Loading...
HomeMy WebLinkAboutAGENDA REPORT 1992 1021 CC REG ITEM 08JMOORPARK STEM 8 S 799 Moorpark Avenue Moorpark, Californ! �(� 529 -6864 City Council oc;;; �3 of ! 199 Z. ACTION: / M E M O R A N D U M dy TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works DATE: October 15, 1992 (Council Meeting 10- 21 -92) SUBJECT: Authorization to Proceed with Preparation of the Design for the Widening of the New Los Angeles Avenue Bridge Across the Arroyo Simi DISCUSSION A. Street Width The ultimate planned width of Los Angeles Avenue / New Los Angeles Avenue is one hundred eighteen feet (1181) with a curb -to -curb dimension of one hundred two feet (102' ) [ see Attachment 'A']. In order accommodate this width at the New Los Angeles Avenue bridge across the Arroyo Simi, it will be necessary to widen the bridge from its present width of eighty -three feet (831) [guard rail to guard rail]. B. Design The City Engineer had prepared a proposal for the preparation of a design for this bridge widening project. The design effort would include the following tasks: • Survey • Hydrographic analysis of the river • Geotechnical investigation • Utility coordination • Preliminary design • Field Investigation • Traffic Control plans • Review and approval by City, Caltrans and Ventura County Flood Control District • Final Design / Construction Documents The amount of the fee for this effort is $77,820. PAUL W. LAWRASON JR. JOHN E. WOZNIAK SCOTT MONTGOMERY BERNARDO M PEREZ ROY E. TALLEY JR. Mayor Mayor Pro Tem Councilmember Councilmember Councilmember Pnnted Cn Recycled Paper New Los Angeles Avenue Bridge Page 2 C. Budget Amendment The FY 1992/93 Budget includes an amount of $50,000 (027- 142 - 903 -0269) for the preparation of this design. It is anticipated that the funding for the construction of this project will be considered next Fiscal Year. It is recommended that the City Council approve the following: • the appropriation of an additional $35,000 from the Los Angeles Avenue AOC for this project; and, • amend the FY 1992/93 Budget to increase funding for this project from $50,000 to $85,000 (a $35,000 increase), an amount sufficient to cover the $77,820 design fee plus reimbursable expenses contingencies. D. Preliminary Project-Cost Estimate Attached as Attachment 'B' is a preliminary construction cost estimate for the this work. Total costruction costs ` are estimated at approximately $630,000. E. Committee Review At their meeting of October 5, the Public Works / Facilities Committee discussed the subject design and recommended that we proceed with the design at this time. RECOHEENDATION Staff and the Public Works / Facilities Committee recommend that the City Council take the following actions: 1. Approve the appropriation of additional funds and the amendment of the FY 1992/93 Budget as described herein. 2. Direct the City Engineer to proceed with the preparation of the subject design in a manner consistent with a Scope of Work to be determined by the City Manager, and for a design fee Not To Exceed $77,820. 3. Approve a project contingency of $7,180 (approximately ten per cent) and authorize the City Manager to approve additional work, if required, not to exceed said amount. vp \rpt \labrdg pftA-) L-A - Atrf, - rId5c C'�s Serra -, y, 121 III_, ............. I I � P , I EXISTING: PROPOSED: ii• oM �pp A- ,l Okc rleAAI I 9 NEW LOS ANGELES AVE:. BRIDGE; WIDENING PRELIMINARY COS'r ESTIMATE: 10/14/92 131' long 8J' wide (outer guardrails) Full width of New L. A. Ave. C. F. to C. F. 6 lanes and 14' median (118 ft wide to the outer guardrails) 2 - 5' wide sidewalks ESTIMATE: Additional 35 ft. wide 35' x 131' = 4585 sq. ft. Bridge const. cost @ S90 /sq. ft x 4565 sq. ft. = $412,650 Approach shoulder widening cost 90,000 ESTIMATED TOTAL COST $502,650 contingency 25% approx. .tiV 125. 662. 50 $628,312 $630,000