Loading...
HomeMy WebLinkAboutAGENDA REPORT 1992 1216 CC REG ITEM 08E8� ITEM . • MOORPARK »A P!< Cd'- _ 799 Moorpark Avenue Moorpark, California 93021 (80 1j Y5 ae�" f - 199 ACTION: AGENIDA REPORT TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works DATE: December 7, 1992 (Council Meeting 12- 16 -92) SUBJECT: Consider Award of Contract for the Placement of Irrigation Crossover Pipes and the Construction of Minor Asphalt Repairs at Various Locations. A. Irrigation Crossovers The Budget for F 1992/93 includes funding for a number of parkway irrigation projects throughout the City. The preliminary design for these projects calls for the construction of underground conduits for the placement of water pipes and irrigation valve control wires at certain street intersections. This construction will reduce the number of water services, and related costs for same, required to construct these projects. Several of the locations for the placement of irrigation crossovers are located in areas which are within the limits of the asphalt overlay project scheduled to go out to bid this month. It is necessary to complete the construction of the irrigation crossovers before the overlay project begins. B. Minor Asphalt Repairs The above project requires the removal and replacement of asphalt paving. In that the work is similar in nature, the reconstruction of asphalt pavement at certain locations has been added to the Scope of Work for this project. DISCUSSION A. Bid Results The results of the bid opening is attached as Exhibit 1. PAUL W. LAWRASON JR. JOHN E. WOZNIAK SCOTT MONTGOMERY BERNARDO M PEREZ ROY E TALLEY JR Mayor Mayor Pro Tem Councilmember Councilmember CouncdmemD r p,nrerl On flee:: e:; -` ._,..- Irrigation Crossovers December 16, 1992 Page 2 B. Add Alternate One of the irrigation crossovers is located within Caltrans right -of -way. An Encroachment Permit Application has been submitted to Caltrans. It is anticipated that the permit will be approved before the work begins. In the event there is a delay, a bid Add Alternate has been provided for re- mobilization. C. Fiscal Impact The cost for the construction of the irrigation crossovers will be charged to the parkway landscaping projects which are funded by Assessment District 84 -2. The cost of the asphalt reconstruction will be charged to the Gas Tax fund. Total project costs are anticipated to be limited to the amount of the construction contract plus inspection costs of approximately $3,000. 1-1 Staff recommends that the City Council take the following actions: 1) award a contract for the subject construction to J & H Engineering for the bid amount of $43,401; 2) approve a ten per cent contingency for the project; and, 3) authorize the Mayor to sign necessary contract documents. rpt \xovr CITY OF MOORPARK Bidder Bid Results -------- - - - - -- NAME : Irrigation Crossovers ADDRESS: Various Locations CITY, STATE: PHONE NUMBER: CONTACT PERSON Bid: 07- Dec -92 ---------------------------------------- 1B ITEM DESCRIPTION Est Qty Unit IA Crossover Runs 954 LF ---------------------- ----------------------- Engineer's Estimate ----------------- - - - - -- UNIT $ TOTAL BID 30.00 28,620.00 VENDOR 1 J & H Engineering 79 Daily Dr Camarillo, CA 93010 (805) 987 -8414 Howard Janotta UNIT $ TOTAL BID 26.25 25,042.50 VENDOR 2 Turf Construction 1535 Flynn Dr Camarillo, CA 93012 (805) 482 -9876 Robert Taylor --------------- - - - -- UNIT $ TOTAL BID 36.00 34,344.00 VENDOR 3 ----------------------- - UNIT $ TOTAL BID --- - --- VENDOR 4 ----------------------- ----------------- - - - - -- UNIT $ TOTAL BID --- - - - - -- ------- - - - - -- General 1B Crossover Runs 126 LF 40.00 5,040.00 26.25 3,307.50 40.00 5,040.00 Location #8 2A Crossover Risers 18 EA 40.00 720.00 90.00 1,620.00 100.00 1,800.00 General 2B Crossover Risers 2 EA 40.00 80.00 90.00 180.00 100.00 200.00 Location #8 3 A/C Repair 1,800 SF 4.00 7,200.00 6.25 11,250.00 5.00 9,000.00 4 Caltrans Permit 1 LS 500.00 500.00 500.00 500.00 500.00 500.00 5 Permit Req. 1 LS 200.00 200.00 1,500.00 500.00 6 7 Release 1 LS 1.00 1.00 1.00 1.00 Total ------------------------------------------------------------------------------------------------------------------------ 42,361.00 ------------------------ 43,401.00 51,385.00 0.00 - 0.00 Add Alt: Remobilization @ #8: 300.00 300.00 200.00