SUBJECT: Consider Authorization to Advertise for Receipt of Bids
for the Construction of an Access Road to Serve the
Sunnyslope Debris Basin
BACKGROUND
1. 'rhe Budget for FY 1993/94
9031 for the construction
2. This project is funded by
3. The Staff Report which
Assessments for AD 84 -2 i
includes a project [page 143.3: 143 -
of the subject project.
Fund 023, Assessment District 84 -2.
accompanied the Budget and annual
ncluded this project.
4. As mentioned in that staff report and approved by the City
Council, the source for the funding for this project is a
portion of the surplus Improvements Assessments levied upon the
.Lots within Zone of Benefit #2 (Tract 2865) over several years
Eor the construction of the Tierra Rejada Road median
Landscaping.
DISCUSSION
A. Project Description
The City maintains a number of the storm drain debris /siltation
basins located south of certain lots in Tract 2865. Pursuant to
the Conditions of Approval, the cost of said maintenance is to
be funded by a portion of the Zone 2 benefit assessments levied
lapon the lots in that Tract.
One of the storm drain debris /siltaion basins is located south
of Lot 226 on Sunnyslope Place ( See Exhibit 1) . This debris
basin was constructed in a manner which does not provide for
vehicular access to the floor of the debris /siltation basin.
This makes it difficult to impossible to provide required
maintenance (silt removal, etc.) at this location. The purpose
of this project is to construct a maintenance access road to
enable the City to provide this maintenance.
suny -r<
P
Sunnyslope Access Road
Page 2
B. Plans and Specifications
Attached as Exhibit 2 is a sketch of the proposed access road to
be constructed. A full set of draft Plans and Specifications
or this project have been distributed to the City Council under
:separate memo.
C. Fiscal Impact
An estimate of total costs for this project is as follows:
Design: $4,960
Construction $16,000
Contract Admin & Inspection $2,000
Total $22,960
Budget Amount: .............. $21,640
The preliminary cost estimate is slightly higher than the budget
amount. More accurate costs will be available subsequent to the
receipt of bids. It is recommended that any required budget
amendment be deferred to that time.
RECOMMENDATIONS
Staff recommends that the City Council approve the plans and
specifications for the project and authorize staff to advertise for
bids.
luny -rd
t/LJ�
°.SCALE: 1'•10'
E)'ISTINCG 16' GM•P•
[APPROX• LXATION)
�
� <
FOW LI��
0 2 '
P.
?I i , s�
c�
ExIST• pa I Ex15T1NG
FE 69 �NCE /WALL
PROP056 D
�� i 1 /• 2 WALL INCA
v ` r
,
I� 1 \\ x�
1 \� 9T0 �
INLET
+ 1
90 P6R CMUG- NQ 5 4�l0
!� Sb- ML-10213
1
`EXISTING
I FLOW LING
a \
2 S
X p \
GENERAL NOTES:
I. ALL COHSTRUCTIDN SIMIl COfO1W TD M STAMARD spECEluTxlNs
FOR Halt wlRe wNSTRUCT)wl LATEST mITION. ALL GRAD►K SHALL
COIEORII TOM UpWOM SILDIA CODF_ LATEST EDRIOH
L No DES" ri tVEY SINS MWORYED YOR TM PROJECT. YERTICAL S
HOIIGONTAL CONTROL IS APPIROISKM
I ALL OOSTSIG IN ORMAIM ON THIS PLAN M BASED ON -AS BILT-
PIJUH
NO. S5456 064L4020 PROVIDED BY M CITY. 7ICDpIi71FJ MOGI EER
HAS WIfFOItl SILITY T¢ THE ACCURACY_OF. TISS IfMftMMK -
4. IT 6 M CITY% 1LSPONSMJYY TO IACATE [n�11i Ir W GRAM •
THE DFORIANna I !NORM ON THIS RAN O on bN.FIE1� CNECK AIO
R ONLY *Oft AT ITS APPR000AATE LOCATION.
S. DUE TO IRICL.GN LETS SSSIWIITION ON AS INir PLAN
PROVCED. �aroam IlTASN/K S ONLY APPRrn wATE.
IT n Mrs TO VEI.FY THIS SEOIISATIOHL
G. ANY �/Q WAY MOIWATION SHOWN ON THIS PLAN
IS sASm ON r PLAN M VIDED BY M CITY AND is ONLY AT ITS
APPROXIMATE LOCATION.
7. DUE TO UNCLEAR AND SICOSIPLETE SEO141ATIOM sNIDwN a1 •AS Slir PLAN
PRWDm BY M CITY, ALL OUAIlTTT1FS SHONM pl THIS PUW ARE APPROXNAATE
M DESIGHM/9IiI CER HAS NO RELPQ.SERJTY TOM ACCURACY OF M
OUA.%MM* CONTRACTOR SHALL SATISFY WMSELI TO THE ACCURACY OF THIS
ESTIMATE
S. THE 4IE AND SLOPE OF THE PROPOSED 24- Clr WAS DESIGNED Shim ON
PROFESSIONAL ADGEAOAT. PER QTY'S MSTRUCTIOK NO HYDROLOGY OR
HYDNAUA.IC CALCLLATIONS WERE PVVVf 4ED.
9. M DENGNMANGNEER RECOHENDS THAT THE CRY vERY CLOSELY MONTOR
THIS PROJECT DURING CONSTRUCTION.
10. UTS.RES. F ANY EOOST HAVE NOT BEEN RESEARCHED OR LOCATED ON THIS PLAN.
R is CRYS IIESPQ.SCS.7TY TO MOVCE THIS MFOR1ATIOK CONTRACTOR SHALL
PROCEED WITH CAUTION DURING GRADING OPERATIONS.
CONSTRUCTION NOTES 8 QUANTITIES
OI CONSTRUCT 2" A.C. ON 3" A.B .................... ....... LUMP SUM
O2 CONSTRUCT 24" CMP AND ._._—___ ..... ............................31! L.F.
ITS INLET 8 OUTLET
O3 EXCAVATION 8 BACKFILL ._.__._.._. _......___.. ... ............ LUMP SUM
4O RETAINING WALL (SEE SHEET 2 OF 2)_..._.__... —. .._LUMP SUM
O5 MODIFY EXISTING 18- CMP — __ .................... ___ ............. LUMP SUM
APB CITY OF.WORPAML DES -11� I EAWN MM6 1 CMECKED NYP I CITY o F SUNNYSLOPE SHEET
OF �-
Pno.l. E?r4 RfCO►WENDm
&Afww M O O R P 4 R K PLACE DRAWING NO.