Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0908 CC SPC ITEM 08C.c•9S6 AG ENDA C = TY O F TO: FROM: DATE: REPORT MOORPARK The Honorable City Council ITEM-&C._. Kenneth C. Gilbert, Director of Public Works August 2, 1993 (Council Meeting 8- 18 -93) DOR ?ARK, CA' of ACTION: SUBJECT: Consider Authorization to Advertise for Receipt of Bids for the Construction of an Access Road to Serve the Sunnyslope Debris Basin BACKGROUND 1. 'rhe Budget for FY 1993/94 9031 for the construction 2. This project is funded by 3. The Staff Report which Assessments for AD 84 -2 i includes a project [page 143.3: 143 - of the subject project. Fund 023, Assessment District 84 -2. accompanied the Budget and annual ncluded this project. 4. As mentioned in that staff report and approved by the City Council, the source for the funding for this project is a portion of the surplus Improvements Assessments levied upon the .Lots within Zone of Benefit #2 (Tract 2865) over several years Eor the construction of the Tierra Rejada Road median Landscaping. DISCUSSION A. Project Description The City maintains a number of the storm drain debris /siltation basins located south of certain lots in Tract 2865. Pursuant to the Conditions of Approval, the cost of said maintenance is to be funded by a portion of the Zone 2 benefit assessments levied lapon the lots in that Tract. One of the storm drain debris /siltaion basins is located south of Lot 226 on Sunnyslope Place ( See Exhibit 1) . This debris basin was constructed in a manner which does not provide for vehicular access to the floor of the debris /siltation basin. This makes it difficult to impossible to provide required maintenance (silt removal, etc.) at this location. The purpose of this project is to construct a maintenance access road to enable the City to provide this maintenance. suny -r< P Sunnyslope Access Road Page 2 B. Plans and Specifications Attached as Exhibit 2 is a sketch of the proposed access road to be constructed. A full set of draft Plans and Specifications or this project have been distributed to the City Council under :separate memo. C. Fiscal Impact An estimate of total costs for this project is as follows: Design: $4,960 Construction $16,000 Contract Admin & Inspection $2,000 Total $22,960 Budget Amount: .............. $21,640 The preliminary cost estimate is slightly higher than the budget amount. More accurate costs will be available subsequent to the receipt of bids. It is recommended that any required budget amendment be deferred to that time. RECOMMENDATIONS Staff recommends that the City Council approve the plans and specifications for the project and authorize staff to advertise for bids. luny -rd t/LJ� °.SCALE: 1'•10' E)'ISTINCG 16' GM•P• [APPROX• LXATION) � � < FOW LI�� 0 2 ' P. ?I i , s� c� ExIST• pa I Ex15T1NG FE 69 �NCE /WALL PROP056 D �� i 1 /• 2 WALL INCA v ` r , I� 1 \\ x� 1 \� 9T0 � INLET + 1 90 P6R CMUG- NQ 5 4�l0 !� Sb- ML-10213 1 `EXISTING I FLOW LING a \ 2 S X p \ GENERAL NOTES: I. ALL COHSTRUCTIDN SIMIl COfO1W TD M STAMARD spECEluTxlNs FOR Halt wlRe wNSTRUCT)wl LATEST mITION. ALL GRAD►K SHALL COIEORII TOM UpWOM SILDIA CODF_ LATEST EDRIOH L No DES" ri tVEY SINS MWORYED YOR TM PROJECT. YERTICAL S HOIIGONTAL CONTROL IS APPIROISKM I ALL OOSTSIG IN ORMAIM ON THIS PLAN M BASED ON -AS BILT- PIJUH NO. S5456 064L4020 PROVIDED BY M CITY. 7ICDpIi71FJ MOGI EER HAS WIfFOItl SILITY T¢ THE ACCURACY_OF. TISS IfMftMMK - 4. IT 6 M CITY% 1LSPONSMJYY TO IACATE [n�11i Ir W GRAM • THE DFORIANna I !NORM ON THIS RAN O on bN.FIE1� CNECK AIO R ONLY *Oft AT ITS APPR000AATE LOCATION. S. DUE TO IRICL.GN LETS SSSIWIITION ON AS INir PLAN PROVCED. �aroam IlTASN/K S ONLY APPRrn wATE. IT n Mrs TO VEI.FY THIS SEOIISATIOHL G. ANY �/Q WAY MOIWATION SHOWN ON THIS PLAN IS sASm ON r PLAN M VIDED BY M CITY AND is ONLY AT ITS APPROXIMATE LOCATION. 7. DUE TO UNCLEAR AND SICOSIPLETE SEO141ATIOM sNIDwN a1 •AS Slir PLAN PRWDm BY M CITY, ALL OUAIlTTT1FS SHONM pl THIS PUW ARE APPROXNAATE M DESIGHM/9IiI CER HAS NO RELPQ.SERJTY TOM ACCURACY OF M OUA.%MM* CONTRACTOR SHALL SATISFY WMSELI TO THE ACCURACY OF THIS ESTIMATE S. THE 4IE AND SLOPE OF THE PROPOSED 24- Clr WAS DESIGNED Shim ON PROFESSIONAL ADGEAOAT. PER QTY'S MSTRUCTIOK NO HYDROLOGY OR HYDNAUA.IC CALCLLATIONS WERE PVVVf 4ED. 9. M DENGNMANGNEER RECOHENDS THAT THE CRY vERY CLOSELY MONTOR THIS PROJECT DURING CONSTRUCTION. 10. UTS.RES. F ANY EOOST HAVE NOT BEEN RESEARCHED OR LOCATED ON THIS PLAN. R is CRYS IIESPQ.SCS.7TY TO MOVCE THIS MFOR1ATIOK CONTRACTOR SHALL PROCEED WITH CAUTION DURING GRADING OPERATIONS. CONSTRUCTION NOTES 8 QUANTITIES OI CONSTRUCT 2" A.C. ON 3" A.B .................... ....... LUMP SUM O2 CONSTRUCT 24" CMP AND ._._—___ ..... ............................31! L.F. ITS INLET 8 OUTLET O3 EXCAVATION 8 BACKFILL ._.__._.._. _......___.. ... ............ LUMP SUM 4O RETAINING WALL (SEE SHEET 2 OF 2)_..._.__... —. .._LUMP SUM O5 MODIFY EXISTING 18- CMP — __ .................... ___ ............. LUMP SUM APB CITY OF.WORPAML DES -11� I EAWN MM6 1 CMECKED NYP I CITY o F SUNNYSLOPE SHEET OF �- Pno.l. E?r4 RfCO►WENDm &Afww M O O R P 4 R K PLACE DRAWING NO.