Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0908 CC SPC ITEM 08STO: FROM: DATE: SUBJECT: AGENDA REPORT CITY OF MOORPARK ITEM 8.S. AC ION: i/ Honorable City Council Mary K. Lindley, Assistant to the City Manager August 27, 1993 (CC Meeting of September 8) Consider FY 1993/94 Budget Amendment and Allocation of Funds for the Construction of Concrete Steps Between the Metrolink Platform and the North Parking Lot To facilitate pedestrian traffic through the north parking lot to the train platform at the Metrolink Station, staff solicited bids for the construction of concrete steps. If approved by Council, a set of steps will be constructed on the dirt slope along the south side of the north parking lot (see attached map). Currently, many Metrolink riders walk across the dirt slope rather than using the end ramps since it takes less time. The installation of steps will reduce the chances of injury and make it easier to access the train platform. The north parking lot was striped so that steps could be easily accommodated at a later time. The specifications included in the bid document were for a set of steps that would consist of six to eight risers, ten feet wide and seven inches high. Proposals were to include handrails on each side of the steps. The bid document also requested a "add alternate" to the project that would provide for the construction of a vertical retaining wall along the side of the steps. A retaining wall would provide stability and a better separation between the steps and the surrounding dirt slope and would enhance the appearance and the life of the steps. Staff recommends that Council approve the project with the inclusion of the retaining wall. The contractor would be required to obtain the building and inspection permit and the City would pay the cost of the permit. Construction of Concrete Steps August 27, 1993 Page 2 The City received one bid from D.I. Construction in the amount of $3,804. The proposal included the "add alternate" for an additional $899. The cost of the building permit is $116. With the addition of a 10% contingency, staff is recommending that the Council approve the project at a cost not to exceed $5,200 and allocate TDA funds for the construction of the steps at the Metrolink Station. As a part of the effort to improve the dirt slope in the north Metrolink parking lot, staff is evaluating the feasibility of landscaping the area. A soil sample was taken for analyses, the results should be available by September 13. Once completed, staff will present a cost estimate for landscaping the dirt slope for Council consideration. Recommendation (roll call vote) Staff recommends that the Council: 1) Appropriate $5,200 from Fund 12, TDA Reserves, 2) Approve an amendment to the FY 1993/94 Budget for the project by adding $5,200 to line item #12.4.515.903, 3) Approve the construction of the steps at a total project cost not to exceed $5,200 from the City's TDA funds, and 4) Authorize the City Manager to execute necessary contract documents. attachments 113 fie) Ad WA—Vdg,WA v Cl 412 pr Ln 1 .11 O 0 0 0 0 0 0 I p % `r/ 0 0 0 �� � / v � v /O /O V]dV ON I MVd HIdON " covl�cq -