HomeMy WebLinkAboutAGENDA REPORT 1993 0908 CC SPC ITEM 11Hy � , ITEM /1. AGENDA REPORT CITY OF MOORPARK TO: Honorable City Council FROM: Dirk Lovett, Assistant City Engineer DATE: August 31, 1993 (CC Meeting of September 8, 1993) ;nCouncil Mec;.;-3 ACTION By SUBJECT: Consider Assessment District 92 -1, Phase II Bid Award CN� OVERVIEW This presents a summary of the bids received for the subject project and recommends award of a contract for said construction. BACKGROUND On August 19, 1992 the City Council adopted a Resolution of Intention to create Assessment District 92 -1 in conjunction with the Mission Bell Plaza. Because of the time constraints involved in processing improvement plans through Caltrans, the Assessment District improvements were split into two phases. This allowed all public improvements not in the Caltrans right -of -way to commence while the Project Study Report and plans for improvements on State Route 118 (L.A. Avenue) were being processed by Caltrans. Phase I construction commenced in May 1993 and should be completed by mid - September 1993. The City Council approved the plans for Phase II and authorized staff to advertise for receipt of bids at the City Council meeting on July 7, 1993. DISCUSSION A. Project Design Both phases of the Assessment District Improvements include the following: Street Improvements: a. Los Angeles Avenue from Park Lane to approximately 400 feet west of Liberty Bell Rd. Improvements on the north side of Los Angeles Ave. include curb, gutter and sidewalk. Improvements on the south side of L.A. Avenue include widening the street to the ultimate width of 118 feet and the construction of curb, gutter, and sidewalk. Assessment Dist. 92 -1 Phase II Page 2 b. Park Lane from Los Angeles Ave. to Lassen Ave., full width improvements including curb, gutter, and sidewalk. C. Lassen Ave., west of Park Lane, full width improvements including curb, gutter, and sidewalk. d. Liberty Bell Road, both north and south of Los Angeles Ave. Improvements north of L.A. Avenue will include full width improvements up to the first driveway of the plaza (approximately 230 feet north of the Los Angeles Avenue right -of -way). Improvements on the south side of Los Angeles are necessary to facilitate the widening of Los Angeles Ave. and will include full width improvements on the east and interim widening on the west. 2. Water system improvements to service the vacant properties north of Los Angeles Ave., within the Assessment District. 3. Storm drain improvements from Lassen Ave., Park Lane, and Los Angeles Ave. to connect to the existing drainage system in Shasta Ave. 4. Traffic signals on Los Angeles Ave., at the intersections of Park Lane and Liberty Bell Road. 5. Street lights along Lassen, Park Lane, Liberty Bell, and Los Angeles Ave. B. Phasing Phase I included all improvements not within the L.A. Avenue right -of -way. These improvements included Park Lane and Lassen Avenue improvements, all water system and storm drain improvements and utility underground. All storm drain improvements as well as street transition improvements onto L.A. Avenue were done as part of Phase I with a Caltrans encroachment permit. Phase II will include all other Los Angeles Ave. right -of -way improvements including street widening and traffic signals. Liberty Bell Road, south of Los Angeles Ave., will also be improved as part of Phase II. C. Bid Summary On August 30th, 1993, bids were received, opened and tabulated. A summary of the bid results is attached as Exhibit I. Assessment District 92 -1 Phase II Page 3 D. Caltrans Permit A Caltrans permit was issued for all improvements on 8/23/93. E. Qualification The apparent low bidder is S.P. Milling Co., with a bid of $588,506.00. During the tabulation/analysis of the bids, it was found that the lowest bidder, S.P. Milling, had neglected to fill in a unit figure for traffic control. Staff contacted S.P. Milling and inquired about the omission. S.P. Milling's representative stated that the figure was inadvertently left off their item entry, but the amount was included in their Total Bid Price. Staff has received a letter from S.P. Milling (Exhibit 2) requesting the Council to still consider acceptance of their original bid amount of $588,506.00 for construction of the Assessment District 92 -1 Phase II. This firm is experienced in the type of work called for in the specifications. Inquiries made to previous employers have been favorable. They have confirmed that the bid prices are valid and that they are prepared to proceed with the construction of the project. F. Fiscal Impact & Budget Appropriation Appropriated construction and acquisition budget from bond sales and AOC funds $3,593,475 2. Estimated costs of construction; Tasks Phase I Phase II Total Design Engineering $ 240,000 Plan Check 38,000 Construction 835,(00 1,071,000 1,906,000 Inspect & Admin. 800x) 105,0(x) 185,000 R -O -W Acquisition 7,00) Future Utility Undergrounding 173,000 Misc. Utilities 125,0(x) Misc. Design Consultants 20,000 Misc. City Engineering Costs to Assess, Prepare, and process project report and permit through Caltrans 84,((x0 TOTAL $2,778,000 Assessment District 92 -1 Phase II Page 4 G. Proiect Schedule It is anticipated that Phase I construction should be completed by September 17, 1993. Phase II construction should commence as early as September 20, 1993 and should be completed by January of 1994. Traffic signals at Los Angeles Ave. and Park Lane, and Los Angeles and Liberty Bell should be operational prior to the opening of K -Mart on November 1, 1993. RECOMMENDATION: Staff recommends that the City Council take the following actions: Accept the request by S.P. Milling to waive the error omitting the unit cost for traffic control and accept the original bid amount of $588,506.00. 2. Award a contract for the construction of Phase II to the lowest responsive bidder, S.P. Milling Co., for the bid ount of $588,506.00. 3. Approve a ten percent 41contingency for the project and authorize the City Manager to approve additional work, if required, for an amount of to exceed ten percent (kilo) of, the contract price. .r /V- 4. Authorize the Mayor to sign necessary contract documents. DIL:cdc 083193.AR1 SOUTHERN PACIFIC MILLING COMPANY READY -MIX CONCRETE ROCK 6 SAND ASPHALTIC CONCRETE ASPHALT PAVING License No. A243254 CITY OF MOORPARK AUGUST 31, 1993 799 MOORPARK AVENUE MOORPARK, CALIFORNIA 93021 ATTN: MR. ALLEN COLLET REGARDING: BID FOR ASSESSMENT DISTRICT PHASE II 92 -1 DEAR SIR: The submittal of Bid Item #4 - Traffic Control was an blank item was an unintentional error of omission. The dollar amount intended was $15,000, as verified by the addition of the "Item Total" column as compared to the amount written in as the "TOTAL BID PRICE ". Attached is a copy of a bid "QUOTATION" from CONTRACTORS BARRICADE SERVICE INC. My bid for this item included the following items: Rental & removal of signs .. ... ......................$2,665.00 Lane closure plus men & equip ... 28 days @ $368 = .....10,304.00 Subtotal......... .............. ......................12,969.00 Overhead & profit ..................... 15 %.......... 2,969.00 Bid Item Total ................. .....................$15,000.00 Please accept my bid as submitted for $588,506.00 and thank you for your consideration. Sincerely, Jim O'Neal Senior Estimator ExYiibit 2 EXHIBIT 1 BID RESULTS To be added to report on Tuesday, August 31, 1993. EXHIBIT 1 Page 1 * `; ` n A � CM `� CITY OF MOORPARK BID RESULTS Bidder NAME: ESTIMATE BIDDER No. 1 Bidder No. 2 Southern Pacific Milling CO. O'Keefe Engineering Incorpated A. D. 92 -1 PHASE II ADRESS: 3555 Vineyard Avenue 4761 Lincoln Avenue BASE BID CITY, STATE: Oxnard CA, 93030 Cypress, CA 90630 Date: 30- AUG. -93 PHONE NUMBER (805) 485 -3101 (714) 826 -7827 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL REM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Mobilization 1 LS $20,000.00 $20,000.00 $12,000.00 $12,000.00 $50,000.00 $50,000.00 2 Clearing & Grubbing 1 LS $10,000.00 $10,000.00 $33,000.00 $33,000.00 $12,000.00 $12,000.00 3 Tree Removal 30 EA $1,500.00 $45,000.00 $1,800.00 $54,000.00 $500.00 $15,000.00 4 Traff ic Control 1 LS $40,000.00 $40,000.00 $15,000.00 $15,000.00 $21,000.00 $21,000.00 5 18" RCP, Class III 15 LF $44.00 $660.00 $68.00 $1,020.00 $145.00 $2,175.00 6 27" RCP, Class III 21 LF $61.00 $1,281.00 $96.00 $2,016.00 $160.00 $3,360.00 7 Catch Basin W =3.5', V =2' 1 EA $3,200.00 $3,200.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 8 Catch Basin W =7.0', V =2' 1 EA $4,700.00 $4,700.00 $3,100.00 $3,100.00 $8,000.00 $8,000.00 9 PCC Collar 2 EA $1,000.00 $2,000.00 $750.00 $1,500.00 $500.00 $1,000.00 10 Unclassified Excavation 5,080 CY $2.50 $12,700.00 $6.00 $30,480.00 $18.00 $91,440.00 11 Untreated Base 4,675 T $20.00 $93,500.00 $15.00 $70,125.00 $13.39 $62,598.25 12 Asphalt Concrete 1,961 T $50.00 $98,050.00 $30.00 $58,830.00 $32.69 $64,105.09 13 Tack Coat 1 T $2,400.00 $2,640.00 $300.00 $330.00 $800.00 $880.00 14 Fog Seal 1.5 T $2,700.00 $4,050.00 $1,000.00 $1,500.00 $900.00 $1,350.00 15 8" Curb /24" Gutter 1,603 LF $16.00 $25,648.00 $11.00 $17,633.00 $7.53 $12,070.59 16 6" Curb /18" Gutter 640 LF $13.00 $8,320.00 $9.50 $6,080.00 $7.53 $4,819.20 17 6" AC Berm 162. LF $7.00 $1,134.00 $8.00 $1,296.00 $15.00 $2,430.00 18 Cold Milling 4,150 g $0.75 $3,112.50 $1.00 $4,150.00 $1.20 $4,980.00 19 4 "PCC Sidewalk 13,125 w $3.75 $49,218.75 $3.00 $39,375.00 $1.80 $23,625.00 Page 1 * `; ` n A � CM `� EXHIBIT 1 BID ITEM DESCRIPTION EST. QTY. UNITS UNIT BID PRICE TOTAL CONTRACT UNIT BID PRICE TOTAL CONTRACT UNIT BID PRICE TOTAL CONTRACT 20 7" Thick PCC Driveway 1,080 SF $4.00 $4,320.00 $3.90 $4,212.00 $3.10 $3,348.00 21 Traffic Signs Relocation 11 EA $100.00 $1,100.00 $175.00 $1,925.00 $181.00 $1,991.00 22 Traffic Signs Removal 3 EA $100.00 $300.00 $133.00 $399.00 $150.00 $450.00 23 Traffic Signs Installation 8 EA $150.00 $1,200.00 $175.00 $1,400.00 $181.00 $1,448.00 24 Remove Striping /Markers 1 LS $20,000.00 $20,000.00 $7,100.00 $7,100.00 $7,336.00 $7,336.00 25 Traffic Signal Lib. Bell Rd. 1 LS $160,000.00 $160,000.00 $62,000.00 $62,000.00 $61,814.50 $61,814.50 26 Traffic Signal Park Ln. 1 LS $150,000.00 $150,000.00 $57,000.00 $57,000.00 $58,449.60 $58,449.60 27 Pavement Marking (12) 5,520 LF $1.00 $5,520.00 $0.40 $2,208.00 $0.44 $2,428.80 28 Pavement Marking (22) 1,510 LF $1.00 $1,510.00 $0.80 $1,208.00 $0.88 $1,328.80 29 Pavement Marking (27B) 1,510 LF $1.00 $1,510.00 $0.50 $755.00 $0.50 $755.00 30 Pavement Marking (29) 270 LF $1.00 $270.00 $0.90 $243.00 $0.88 $237.60 31 Pavement Marking (32) 1,020 LF $1.00 $1,020.00 $0.70 $714.00 $0.77 $785.40 32 Pavement Marking (38) 1,590 LF $1.00 $1,590.00 $1.00 $1,590.00 $1.00 $1,590.00 33 Type "D" Marker 350 EA $5.00 $1,750.00 $3.20 $1,120.00 $3.30 $1,155.00 34 Type "G" Marker 300 EA $5.00 $1,500.00 $3.20 $960.00 $3.30 $990.00 35 Arrows, Cross - Walks, Etc 2,424 SF $2.00 $4,848.00 $3.00 $7,272.00 $2.75 $6,666.00 36 Pavement Marking (21) 528 LF $1.50 $792.00 $0.50 $264.00 $0.33 $174.24 37 Pavement Marking (38) 150 LF $0.70 $105.00 $0.30 $45.00 $0.30 $45.00 38 Arrows Fig. 6 -12 127 SF $0.70 $88.90 $2.00 $254.00 $2.00 $254.00 39 Street Light Conduit 1 LS $11,000.00 $11,000.00 $5,000.00 $5,000.00 $5,100.00 $5,100.00 40 Irrigation 1 LS $30,000.00 $30,000.00 $32,000.00 $32,000.00 $16,126.00 $16,126.00 41 Planting 1 LS $41,000.00 $41,000.00 $41,000.00 $41,000.00 $30,503.00 $30,503.00 42 Landscape Maintance 1 LS $2,500.00 $2,500.00 $3,000.00 $3,000.00 1 $1,500.00 $1,500.00 Page 2 EXHIBIT 1 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 43 Construction Surveying 1 LS $25,000.00 $25,000.00 $3,400.00 $3,400.00 $5,000.00 $5,000.00 44 Release on Contract 1 LS $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 45 Caltrans Permit 1 LS $70.00 $70.00 $1.00 $1.00 $65.00 $65.00 TOTAL $892,209.15 $588,506.00 $595,375.07 Les s OVA. ��riw► 4 C s000i Rer�s� To ke-1 5730SO(t Page 3 EXHIBIT 1 Page 4 CITY OF MOORPARK BID RESULTS Bidder NAME: ESTIMATE BIDDER No. 3 Bidder No. 4 Granite Construction Company Berry Gen. Eng. Contractors, Inc. A. D. 92 -1 PHASE II ADRESS: P.O. Box 50085 P.O. Box 7178 BASE BID CITY, STATE: Watsonville, CA 95077 -5085 Oxnard, CA 93031 Date: 30- AUG. -93 PHONE NUMBER (408) 724 -1011 (805) 485 -9826 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Mobilization 1 LS $20,000.00 $20,000.00 $51,737.00 $51,737.00 $13,500.00 $13,500.00 2 Clearing & Grubbing 1 LS $10,000.00 $10,000.00 $33,231.00 $33,231.00 $71,665.00 $71,665.00 3 Tree Removal 30 EA $1,500.00 $45,000.00 $1,200.00 $36,000.00 $1,910.00 $57,300.00 4 Traffic Control 1 LS $40,000.00 $40,000.00 $25,000.00 $25,000.00 $20,490.00 $20,490.00 5 18" RCP, Class III 15 LF $44.00 $660.00 $35.00 $525.00 $68.00 $1,020.00 6 27" RCP, Class III 21 LF $61.00 $1,281.00 $50.00 $1,050.00 $95.00 $1,995.00 7 Catch Basin W =3.5', V =2' 1 EA $3,200.00 $3,200.00 $4,100.00 $4,100.00 $2,015.00 $2,015.00 8 Catch Basin W =7.0', V =2' 1 EA $4,700.00 $4,700.00 $4,300.00 $4,300.00 $3,076.00 $3,076.00 9 PCC Collar 2 EA $1,000.00 $2,000.00 $100.00 $200.00 $371.00 $742.00 10 Unclassified Excavation 5,080 CY $2.50 $12,700.00 $9.00 $45,720.00 $10.75 $54,610.00 11 Untreated Base 4,675 T $20.00 $93,500.00 $14.00 $65,450.00 $16.00 $74,800.00 12 Asphalt Concrete 1,961 T $50.00 $98,050.00 $35.00 $68,635.00 $32.00 $62,752.00 13 Tack Coat 1 T $2,400.00 $2,640.00 $170.00 $187.00 $1,750.00 $1,925.00 14 Fog Seal 1.5 T $2,700.00 $4,050.00 $500.00 $750.00 $746.00 $1,119.00 15 8" Curb /24" Gutter 1,603 LF $16.00 $25,648.00 $10.00 $16,030.00 $11.00 $17,633.00 16 6" Curb /18" Gutter 640 LF $13.00 $8,320.00 $9.00 $5,760.00 $8.00 $5,120.00 17 6" AC Berm 162 LF $7.00 $1,134.00 $6.00 $972.00 $6.20 $1,004.40 18 Cold Milling 4,150 SF $0.75 $3,112.50 $0.70 $2,905.00 $0.74 $3,071.00 19 4" PCC Sidewalk 13,125 T $3.75 $49,218.75.1 $3.00 $39,375.00 $1.40 $18,375.00 Page 4 EXHIBIT 1 BID ITEM DESCRIPTION EST. QTY. UNITS UNIT BID PRICE TOTAL CONTRACT UNIT BID PRICE TOTAL CONTRACT UNIT BID PRICE TOTAL CONTRACT 20 7" Thick PCC Driveway 1,080 SF $4.00 $4,320.00 $5.00 $5,400.00 $3.00 $3,240.00 21 Traffic Signs Relocation 11 EA $100.00 $1,100.00 $175.00 $1,925.00 $228.00 $2,508.00 22 Traffic Signs Removal 3 EA $100.00 $300.00 $165.00 $495.00 $63.00 $189.00 23 Traffic Signs Installation 8 EA $150.00 $1,200.00 $300.00 $2,400.00 $280.00 $2,240.00 24 Remove Striping/Markers 1 LS $20,000.00 $20,000.00 $2,500.00 $2,500.00 $7,073.00 $7,073.00 25 Traffic Signal Lib. Bell Rd. 1 LS $160,000.00 $160,000.00 $59,000.00 $59,000.00 $72,720.00 $72,720.00 26 Traffic Signal Park Ln. 1 LS $150,000.00 $150,000.00 $56,000.00 $56,000.00 $79,280.00 $79,280.00 27 Pavement Marking (12) 5,520 LF $1.00 $5,520.00 $0.80 $4,416.00 $0.42 $2,318.40 28 Pavement Marking (22) 1,510 LF $1.00 $1,510.00 $0.80 $1,208.00 $0.85 $1,283.50 29 Pavement Marking (27B) 1,510 LF $1.00 $1,510.00 $0.80 $1,208.00 $0.50 $755.00 30 Pavement Marking (29) 270 LF $1.00 $270.00 $1.50 $405.00 $0.85 $229.50 31 Pavement Marking (32) 1,020 LF $1.00 $1,020.00 $0.80 $816.00 $0.75 $765.00 32 Pavement Marking (38) 1,590 LF $1.00 $1,590.00 $0.80 $1,272.00 $0.95 $1,510 50 33 Type "D" Marker 350 EA $5.00 $1,750.00 $3.50 $1,225.00 $3.20 $1,120.00 34 Type "G" Marker 300 EA $5.00 $1,500.00 $3.25 $975.00 $3.20 $960.00 35 Arrows, Cross - Walks, Etc 2,424 SF $2.00 $4,848.00 $3.00 $7,272.00 $2.65 $6,423.60 36 Pavement Marking (21) 528 LF $1.50 $792.00 $1.00 $528.00 $0.30 $158.40 37 Pavement Marking (38) 150 LF $0.70 $105.00 $1.50 $225.00 $0.30 $45.00 38 Arrows Fig. 6 -12 127 SF $0.70 $88.90 $4.00 $508.00 $2.00 $254.00 39 Street Light Conduit 1 LS $11,000.00 $11,000.00 $5,000.00 $5,000.00 $13,275.00 $13,275.00 40 Irrigation 1 LS $30,000.00 $30,000.00 $22,635.00 $22,635.00 $33,309.00 $33,309.00 41 Planting 1 LS $41,000.00 $41,000.00 $25,122.00 $25,122.00 $33,309.00 $33,309.00 42 Landscape Maintance 1 LS $2,500.00 $2,500.00 $1,800.00 $1,800.00 $750.00 $750.00 Page 5 EXHIBIT 1 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BI) PRICE CONTRACT 43 44 45 Construction Surveying Release on Contract Caltrans Permit 1 1 1 LS LS LS $25,000.00 $1.00 $70.00 $25,000.00 $1.00 $70.00 $3,200.00 $1.00 $1,400.00 $3,200.00 $1.00 $1,400.00 $4,455.00 $1.00 $4,323.00 $4,455.00 $1.00 $4,323.00 TOTAL $892,209.15 $608,863.00 $684,707.30 Page 6 EXHIBIT 1 Page 7 CITY OF MOORPARK BID RESULTS Bidder NAME: ESTIMATE BIDDER No. 5 Bidder No. 6 D. W. Burhoe Construction, Inc. C. A. Rasmussen, Inc. A. D. 92 -1 PHASE II ADRESS: 270 Quail Court 2360 Shasta Way BASE BID CITY, STATE: Santa Paula, CA 93060 Simi Valley, CA 93065 Date: 30- AUG. -93 PHONE NUMBER (805) 525 -7474 (805) 527 -9330 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BD PRICE CONTRACT 1 Mobilization 1 LS $20,000.00 $20,000.00 $51,560.00 $51,560.00 $42,000.00 $42,000.00 2 Clearing & Grubbing 1 LS $10,000.00 $10,000.00 $26,000.00 $26,000.00 $25,000.00 $25,000.00 3 Tree Removal 30 EA $1,500.00 $45,000.00 $1,940.00 $58,200.00 $5,350.00 $160,500.00 4 Traffic Control 1 LS $40,000.00 $40,000.00 $35,400.00 $35,400.00 $18,500.00 $18,500.00 5 18" RCP, Class III 15 LF $44.00 $660.00 $48.00 $720.00 $81.00 $1,215.00 6 27" RCP, Class III 21 LF $61.00 $1,281.00 $60.00 $1,260.00 $91.00 $1,911.00 7 Catch Basin W =3.5', V =2' 1 EA $3,200.00 $3,200.00 $2,980.00 $2,980.00 $3,100.00 $3,100.00 8 Catch Basin W =7.0', V =2' 1 EA $4,700.00 $4,700.00 $3,550.00 $3,550.00 $4,500.00 $4,500.00 9 PCC Collar 2 EA $1,000.00 $2,000.00 $320.00 $640.00 $300.00 $600.00 10 Unclassified Excavation 5,080 CY $2.50 $12,700.00 $9.67 $49,123.60 $6.30 $32,004.00 11 Untreated Base 4,675 T $20.00 $93,500.00 $14.80 $69,190.00 $13.00 $60,775.00 12 Asphalt Concrete 1,961 T $50.00 $98,050.00 $30.30 $59,418.30 $32.00 $62,752.00 13 Tack Coat 1 T $2,400.00 $2,640.00 $790.00 $869.00 $750.00 $825.00 14 Fog Seal 1.5 T $2,700.00 $4,050.00 $680.00 $1,020.00 $1,500.00 $2,250.00 15 8" Curb /24" Gutter 1,603 LF $16.00 $25,648.00 $8.95 $14,346.85 $8.80 $14,106.40 16 6" Curb /18" Gutter 640 LF $13.00 $8,320.00 $8.15 $5,216.00 $7.70 $4,928.00 17 6" AC Berm 162 LF $7.00 $1,134.00 $13.10 $2,122.20 $13.00 $2,106.00 18 Cold Milling 4,150 g $0.75 $3,112.50 $1.00 $4,150.00 $0.80 $3,320.00 19 4" PCC Sidewalk 13,125 SF $3.75 $49,218.75 $1.65 $21,656.25 $1.50 $19,687.50 Page 7 EXHIBIT 1 BID ITEM DESCRIPTION EST. QTY. UNITS UNIT BID PRICE TOTAL CONTRACT UNIT BID TOTAL CONTRACT UNIT BID PRICE TOTAL CONTRACT 20 7" Thick PCC Driveway 1,080 g $4.00 $4,320.00 $2.70 $2,916.00 $2.30 $2,484.00 21 Traffic Signs Relocation 11 EA $100.00 $1,100.00 $390.00 $4,290.00 $230.00 $2,530.00 22 Traffic Signs Removal 3 EA $100.00 $300.00 $150.00 $450.00 $85.00 $255.00 23 Traffic Signs Installation 8 EA $150.00 $1,200.00 $235.00 $1,880.00 $180.00 $1,440.00 24 Remove Striping /Markers 1 LS $20,000.00 $20,000.00 $7,300.00 $7,300.00 $7,300.00 $7,300.00 25 Traffic Signal Lib. Bell Rd. 1 LS $160,000.00 $160,000.00 $72,680.00 $72,680.00 $62,000.00 $62,000.00 26 Traffic Signal Park Ln. 1 LS $150,000.00 $150,000.00 $78,820.00 $78,820.00 $58,500.00 $58,500.00 27 Pavement Marking (12) 5,520 LF $1.00 $5,520.00 $0.42 $2,318.40 $0.45 $2,484.00 28 Pavement Marking (22) 1,510 LF $1.00 $1,510.00 $1.15 $1,736.50 $0.90 $1,359.00 29 Pavement Marking (27B) 1,510 LF $1.00 $1,510.00 $0.79 $1,192.90 $0.50 $755.00 30 Pavement Marking (29) 270 LF $1 00 $270.00 $2.67 $720.90 $0.90 $243.00 31 Pavement Marking (32) 1,020 LF $1.00 $1,020.00 $1.03 $1,050.60 $0.75 $765.00 32 Pavement Marking (38) 1,590 LF $1.00 $1,590.00 $1.21 $1,923.90 $1.00 $1,590.00 33 Type "D" Marker 350 EA $5.00 $1,750.00 $4.40 $1,540.00 $3.30 $1,155.00 34 Type "G" Marker 300 EA $5.00 $1,500.00 $4.40 $1,320.00 $3.30 $990.00 35 Arrows, Cross - Walks, Etc 2,424 g $2.00 $4,848.00 $3.41 $8,265.84 $2.75 $6,666.00 36 Pavement Marking (21) 528 LF $1.50 $792.00 $0.66 $348.48 $0.35 $184.80 37 Pavement Marking (38) 150 LF $0.70 $105.00 $1.75 $262.50 $0.35 $52.50 38 Arrows Fig. 6 -12 127 SF $0.70 $88.90 $2.88 $365.76 $2.00 $254.00 39 Street Light Conduit 1 LS $11,000.00 $11,000.00 $14,850.00 $14,850.00 $5,200.00 $5,200.00 40 Irrigation 1 LS $30,000.00 $30,000.00 $32,000.00 $32,000.00 $33,000.00 $33,000.00 41 Planting 1 LS $41,000.00 $41,000.00 $32,000.00 $32,000.00 $35,000.00 $35,000.00 42 Landscape Maintance 1 LS $2,500.00 $2,500.00 $3,010.00 $3,010.00 $2,600.00 $2,600.00 Page 8 EXHIBIT 1 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 43 44 45 Construction Surveying Release on Contract Caltrans Permit 1 1 1 LS LS LS $25,000.00 $1.00 $70.00 $25,000.00 $1.00 $70.00 $5,100.00 $1.00 $3,650.00 $5,100.00 $1.00 $3,650.00 $4,600.00 $1.00 $5,000.00 $4,600.00 $1.00 $5,000.00 TOTAL $892,209.15 $687,414.98 $696,488.20 Page 9 EXHIBIT 1 Page 10 CITY OF MOORPARK BID RESULTS Bidder NAME: ESTIMATE BIDDER No. 7 Bidder No. 8 R & H Paving, Inc. Union Engineering Company, Inc. A. D. 92 -1 PHASE II ADRESS: 1497 Los Angeles Avenue P.O. Box 1000 BASE BID CITY, STATE: Saticoy, CA 93004 Ventura, CA 93002 Date: 30- AUG. -93 PHONE NUMBER (805) 647 -3286 (805) 648 -3373 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION OTY. UNITS BD PRICE CONTRACT BD PRICE CONTRACT BD PRICE CONTRACT 1 Mobilization 1 LS $20,000.00 $20,000.00 $7,500.00 $7,500.00 $85,845.00 $85,845.00 2 Clearing & Grubbing 1 LS $10,000.00 $10,000.00 $35,500.00 $35,500.00 $24,132.00 $24,132.00 3 Tree Removal 30 EA $1,500.00 $45,000.00 $1,766.00 $52,980.00 $3,367.20 $101,016.00 4 Traffic Control 1 LS $40,000.00 $40,000.00 $36,000.00 $36,000.00 $56,120.00 $56,120.00 5 18" RCP, Class III 15 LF $44.00 $660.00 $67.33 $1,009.95 $45.30 $679.50 6 27" RCP, Class III 21 LF $61.00 $1,281.00 $94.62 $1,987.02 $51.00 $1,071.00 7 Catch Basin W =3.5', V =2' 1 EA $3,200.00 $3,200.00 $1,995.00 $1,995.00 $1,796.00 $1,796.00 8 Catch Basin W =7.0', V =2' 1 EA $4,700.00 $4,700.00 $3,050.00 $3,050.00 $2,133.00 $2,133.00 9 PCC Collar 2 EA $1,000.00 $2,000.00 $375.00 $750.00 $140.50 $281.00 10 Unclassified Excavation 5,080 CY $2.50 $12,700.00 $6.88 $34,950.40 $8.50 $43,180.00 11 Untreated Base 4,675 T $20.00 $93,500.00 $16.10 $75,267.50 $15.50 $72,462.50 12 Asphalt Concrete 1,961 T $50.00 $98,050.00 $30.45 $59,712.45 $35.50 $69,615.50 13 Tack Coat 1 T $2,400.00 $2,640.00 $850.00 $935.00 $898.20 $988.02 14 Fog Seal 1.5 T $2,700.00 $4,050.00 $366.00 $549.00 $561.30 $841.95 15 8" Curb /24" Gutter 1,603 LF $16.00 $25,648.00 $9.94 $15,933.82 $8.40 $13,465.20 16 6" Curb /18" Gutter 640 LF $13.00 $8,320.00 $9.25 $5,920.00 $7.90 $5,056.00 17 6" AC Berm 162 LF $7.00 $1,134.00 $25.00 $4,050.00 $14.60 $2,365.20 18 Colo Milling 4,150 -CF $0.75 $3,112.50 $0.90 $3,735.00 $0.81 $3,361.50 19 4" PCC Sidewalk 13,125 SF $3.75 $49,218.75 $2.15 $28,218.75 $2.00 $26,250.00 Page 10 EXHIBIT 1 BID ITEM DESCRIPTION EST. QTY. UNITS UNIT BID PRICE TOTAL CONTRACT UNIT BID TOTAL CONTRACT UNIT BID PRICE TOTAL CONTRACT 20 7" Thick PCC Driveway 1,080 _CF $4.00 $4,320.00 $8.00 $8,640.00 $3.40 $3,672.00 21 Traffic Signs Relocation 11 EA $100.00 $1,100.00 $198.00 $2,178.00 $185.30 $2,038.30 22 Traffic Signs Removal 3 EA $100.00 $300.00 $150.00 $450.00 $140.30 $420.90 23 Traffic Signs Installation 8 EA $150.00 $1,200.00 $198.00 $1,584.00 $185.10 $1,480.80 24 Remove Striping /Markers 1 LS $20,000.00 $20,000.00 $8,060.00 $8,060.00 $7,484.00 $7,484.00 25 Traffic Signal Lib. Bell Rd. 1 LS $160,000.00 $160,000.00 $99,500.00 $99,500.00 $70,560.00 $70,560.00 26 Traffic Signal Park Ln. 1 LS $150,000.00 $150,000.00 $96,000.00 $96,000.00 $75,040.00 $75,040.00 27 Pavement Marking (12) 5,520 LF $1.00 $5,520.00 $0.48 $2,649.60 $0.40 $2,208.00 28 Pavement Marking (22) 1,510 LF $1.00 $1,510.00 $0.97 $1,464.70 $0.90 $1,359.00 29 Pavement Marking (27B) 1,510 LF $1.00 $1,510.00 $0.54 $815.40 $0.50 $755.00 30 Pavement Marking (29) 270 LF $1.00 $270.00 $0.97 $261.90 $0.90 $243.00 31 Pavement Marking (32) 1,020 LF $1.00 $1,020.00 $0.84 $856.80 $0.80 $816.00 32 Pavement Marking (38) 1,590 LF $1.00 $1,590.00 $1.10 $1,749.00 $1.00 $1,590.00 33 Type "D" Marker 350 EA $5.00 $1,750.00 $3.60 $1,260.00 $3.40 $1,190.00 34 Type "G" Marker 300 EA $5.00 $1,500.00 $3.60 $1,080.00 $3.40 $1,020.00 35 Arrows, Cross - Walks, Etc 2,424 SF $2.00 $4,848.00 $3.04 $7,368.96 $2.80 $6,787.20 36 Pavement Marking (21) 528 LF $1.50 $792.00 $0.37 $195.36 $0.30 $158.40 37 Pavement Marking (38) 150 LF $0.70 $105.00 $0.36 $54.00 $0.30 $45.00 38 Arrows Fig. 6 -12 127 g $0.70 $88.90 $214.00 $27,178.00 $2.00 $254.00 39 Street Light Conduit 1 LS $11,000.00 $11,000.00 $40,000.00 $40,000.00 $11,200.00 $11,200.00 40 Irrigation 1 LS $30,000.00 $30,000.00 $25,135.00 $25,135.00 $34,166.00 $34,166.00 41 Planting 1 LS $41,000.00 $41,000.00 $27,622.00 $27,622.00 $40,282.00 $40,282.00 42 Landscape Maintance 1 LS $2,500.00 $2,500.00 $2,500.00 $2,500.00 1 $3,143.00 $3,143.00 Page 11 EXHIBIT 1 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 43 44 45 Construction Surveying Release on Contract Caltrans Permit 1 1 1 LS LS LS $25,000.00 $1.00 $70.00 $25,000.00 $1.00 $70.00 $12,500.00 $1.00 $2,500.00 $12,500.00 $1.00 $2,500.00 $3,592.00 $1.00 $5,388.00 $3,592.00 $1.00 $5,388.00 TOTAL $892,209.15 $741,647.61 $785,552.97 Page 12