CITY OF' MOORPARK - -- - =
CITY COUNCIL AGENDA REPORT
TO: The Honorable City Council -�
FROM: Donald P. Reynolds Jr., Administrative Services Ma ager/
DATE: January 25, 1994
SUBJECT: Consider Use of Funds Appropriated for an Emergency
Generator
Staff has been working over the past three years to develop a plan
for the purchase of an emergency generator to power City
facilities. The following proposal will present a phased approach
to providing power to three buildings as revised by the Public
Works, Solid Waste and Transportation Committee (Councilmembers
Wozniak and Montgomery) on Tuesday. January 18, 1994.
Background
The City Council appropriated $23,000 for the purchase of an
emergency generator which is included in this year's 1993/94
budget. Staff realized that in the absence of an disaster
preparedness plan, and subsequent identification of a City
Emergency Operations Center, ("EOC"), there was no basis for
determining what capacity equipment would be needed.
In the past, it was proposed that the City purchase a federal
surplus generator. Staff researched and inspected these generators
in 1991 and concluded that the surplus equipment is too
deteriorated for a cost efficient dependable operation.
Deterioration is not because of overuse, but due to under use. The
equipment must be "exercised" monthly to maintain reliability.
In October 1992, staff began to identify needs for powering all of
the three City buildings at the Community Center. A proposal of
$300,000 was received from a reputable electrical company. This
estimate includes features that the City may not need, and later
staff determined that the generator specified by the contractor was
three times larger than the current power uses. This estimate was
deemed to be too costly.
In April 1993, staff received a proposal from a different
contractor for a product that was under budget at $20,000. The
design was based on a small generator currently used at the City of
Lakewood's City Hall. This system when applied to Moorpark, would
operate three circuits. It was planned to run the conference room,
or approximately three lights and some computers at City Hall. It
was identified in this bid, that 800 of the cost was for the
electrical work and a storage facil ity for gasoline, and 20% of the
cost was for the 6.5 KW portable venerator. This recommendation
was deemed to be too small.
In July, staff began to focus on the needs for an EOC after the
State approved the City's Multi- Functional Hazard Plan. It was
determined that the conference room is too small to house the EOC.
The Community Center was also disregarded as a primary option, due
to the extensive daily use by the community, the potential for this
facility to house rescue operations (i.e. fire crews), and the
ability to provide shelter and food services for citizens from this
location. Therefore, it was determined the ideal location of an
EOC would be in a new facility.
Discussion
On January 18, 1994, the Committee reviewed staff's draft phasing
plan. This plan proposes that phases of development for emergency
power be based on the current budget amount, extended over the next
three to four years. It proposes an EOC to be part of the new
Annex, and that a separate power supply be funded for the annexes,
City Hall, and the Community Center.
The Committee changed the proposal by recommending that an
emergency power supply for the new annex be designed together with
the purchase of the building. City Hall electrical connections are
considered to be the immediate priority. The third step would be
to purchase a generator for City Hall, and then to consider a
portable generator (mounted on a trailer) that could be used to
power additional needs at the Community Center, as well as be used
for special events, recreational activities held off -site, and to
power equipment for the Public Works Department.
As a result of the direction received, the following analysis will
only address the existing facilities. Information for the proposed
new Annex and EOC will be provided to the Council in a separate
report.
Electrical Work
A study of the proposals received indicate that 80% of the expense
to establish an emergency generator system is related to the
wiring, transfer switches and other aspects of the connection
between the generator and the building. The Committee did not see
a need to hire an engineer for the development of this design, but
after further staff consideration, it is recommended that the City
retain a qualified electrical engineer.
The estimated cost for an engineer, developed after the completion
of a study of the City's use of electricity and tour of the current
conditions at City Hall, is estimated to be $1,500. It may be
possible to receive additional designs for the Community Center and
Annex for an estimated cost of $500 each.
It is estimated that the City Hal l facility could be adapted to
emergency power sources within the current budget. It is
2
recommended that the City procure a generator that allows for
growth beyond the current peak electrical loads, use the
receptacles designed so that any person can correctly attach the
power supply, and use less expensive manual transfer switches.
Reducing the generator size (in an attempt to lower the cost of the
generator) by eliminating items in the building that require a high
power supply, such as the air conditioning, will cause higher costs
in the installation phase, due to the additional labor required to
specially wire the facility.
A trailer mounted generator for City Hall will work with the
concept described above if securely fastened to a foundation when
not in use, and if available to City Hall when a power failure
occurs. It can be retro- fitted with an electrical panel which will
allow it to be used in other locations and for planned special
events and City jobs. The best use for a portable generator
however, may be only for use at the Community Center with a
permanent generator installed at City Hall as well as the new
Annex.
Staff would like to pursue all options including a stationary
generator for City Hall and at the new Annex, and use of a trailer
mounted generator for the Community Center and other City
functions. By working with the engineer and experienced disaster
response personnel, staff will be able to include the most
favorable solution in the final the design.
Generators
The City currently has two small generators and a welding generator
affixed to a trailer. This equipment can be used now to operate
appliances and portable lights in the Community Center if needed,
(in much the same way as they were used during the power outage at
the 1992 Cinco De Mayo event).
Peak electrical loads at City facilities, based on a study of past
records from Southern California Edison, show that the City's peak
needs during the last twelve months are as follows: Community
Center- 75.3 KW; City Hall- 36.9 KW, and; the Annex- 16.2 KW. For
a generator to run either City Hall or the Community Center, a 100
KW generator is recommended. It can't run both facilities
simultaneously unless the two buildings are wired to the same power
panel and a larger generator is purchased. For the new annex
building, a generator between 20 and 25 KW is recommended.
Staff received rough estimates for various sized used generators as
follows: 60KW = $13,500, and a 40KW generator = $8,000. This
particular vendor does not have a 100 KW size generator available.
Each price includes a trailer and gasoline storage for
approximately 8 to 16 hours of service (20 to 30 gallon fuel
tanks). Additional gasoline could be stored appropriately in a 50
gallon drum on site, which would add another 20 to 25 hours of
operation to the original tank capacity.
Comparable sized new generators, mounted on trailers with a 100 to
120 gallon fuel tank, are priced as follows: 40 KW, 100 gallon fuel
tank = $18,587; 60KW, 100 gallon fuel tank = $20,589, and; 100 KW,
120 gallon fuel tank $25,203. With this fuel capacity, the new
generators will operate for approximately 200 to 250 hours. The
vendor provided list prices which are negotiable, and staff will
continue to locate pricing on new and used equipment to assure the
City receives the best value.
The generators will use 2 to 3 gallons of fuel per hour,
approximately one quart of oil per day, and need to have the fuel
filter replaced as needed based upon the quality of the fuel. The
used generators may burn oil more quickly, but both new and used
generators can receive oil while running. Therefore, with no major
failures and as long as the fuel filters remain functional, both
gasoline and oil can be added to keep the generators operating for
several consecutive days.
Conclusion
Staff strongly recommends the use of a professional to design the
emergency power systems for City Hall and the Community Center.
Based on these designs, bids can be solicited. The outcome of the
bid solicitation, will assist the City in identifying the adequacy
of the current budget. Staff could return at that time for
additional direction, but it is recommended that staff be
authorized to proceed to acquire the generator for City Hall as
discussed in this report at a cost not to exceed $23,000, without
further Council approvals. Development of a similar electrical
system and generator for the Community Center could be proposed in
the next fiscal year using this year's design.
Other uses for the generator will be more closely analyzed and may
be able help justify the use of funds from other sources to assist
the City to purchase a trailer mounted generator this fiscal year.
In the mean time, rented equipment can be used to provide emergency
power.
Recommendation
That the City Council authorize staff to procure the services of an
electrical engineer to design a system for both the Community
Center and City Hall, and authorize the City Manager to process bid
solicitations and award of contract for electrical work at City
Hall, and if funds are available for the Community Center, at a
cost not to exceed $23,000 and consistent with this report.
4