Loading...
HomeMy WebLinkAboutAGENDA REPORT 1994 0202 CC REG ITEM 08N i// � / � p' ITEM0 AGENDA REPORT CITY OP MOORPARK TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works'7 ..C)07^F.�K. DATE: January 25, 1994 (Council Meeting 2-2-94) /r/ of lc? 47 SUBJECT: Consider Amendment to Contract with VCE, ACTION (.(1)4941,7,C:1 Inc. for the Design of the Arroyo Vista Community Park Pedestrian Bridge b 4L OVERVIEW This requests approval of an amendment to the subject Agreement to allow for the preparation a hydrology report. BACKGROUND In April of 1993 the City Council retained the services of VCE, Inc. to prepare the design for the Equestrian / Pedestrian Bridge for Arroyo Vista Community Park. In August of that year the City Council approved an amendment to that contract to expand the scope of work to include the preparation of soils reports required for the preparation of the design. DISCUSSION A. Floodplain Boundaries The present channel and levies for the Arroyo Simi will not contain storm flows from a 100-year storm. The Federal Insurance Rate Maps (FIRM) for the City of Moorpark show an area along the north and south sides of the Arroyo which are within the boundaries of a 100-year storm and thus susceptible to inundation. B. Channel Widening Project The Ventura County Flood Control District (VCFCD) is developing a channel improvement project for a portion of the Arroyo Simi, which includes the area where the Arroyo Vista Community Park pedestrian / equestrian bridge is to be constructed. When that project is completed a 100-year storm will be contained within the channel . pedbrg5 VCE Contract Amendment Page 2 C. Bridge Design Parameters The VCFCD channel improvement project calls for the lowering of the water level at the planned location for the pedestrian bridge. The design parameters for the pedestrian bridge are based on the proposed channel widening improvement project, and as such, calls for the construction of the bridge in a manner which will be compatible with the future ultimate channel widening project. The proposed lowering of the water surface by the channel improvement project enables the City to design and construct a pedestrian bridge which is both shorter and lower than what would be required if no channel modifications were being planned. The resultant bridge project is more functional , more compatible with surrounding properties and less expensive than a longer and higher structure. In light of the above, the pedestrian bridge design calls for the elevation of the soffit (bottom) of the bridge to be lower than the current elevation of a 100-year storm at the bridge location. This factor, combined with the construction of a slightly elevated bridge access roads and levy maintenance roads, will have the effect of creating an obstruction to storm waters flowing at and slightly lower than the 100-year flood elevation at this location. Until the VCFCD channel improvement project is completed, this obstruction could divert 100-year storm flows in a manner which could inundate properties beyond the present boundaries of a 100-year storm as presently shown on the FIRM map. D. Hydrology Report VCE, the design consultant for this project, has given the City a price of $5,000 to prepare a hydrology study to determine the effect of the construction of the pedestrian bridge as presently proposed on the flow characteristics of a 100-year storm at and upstream of the project site. E. Committee Review At their January meeting, the Public Works, Facilities and Solid Waste Committee (Councilmembers Wozniak and Montgomery) discussed and concurred that this additional design work should be performed. pedbrg5 VCE Contract Amendment Page 3 F. Fiscal Impact 1 . Fee Increase: A summary of the fee increase for these additional services is as follows: Existing Fee: $49 ,746 Increase for Soils Engineering: 3 ,968 Sub-total $53 , 714 Proposed Increase for Hydrology Report: 5,000 Revised Fee Amount: $58, 714 2 . Budget: The budget for this project for FY1993/94 is as follows: Spring / Tierra Rejada AOC (026) : $200,000 L. A. Avenue AOC (027) : 300 ,000 Project Total : $500 ,000 No additional appropriations are required to approve the proposed increase in the design fee. 3 . Funding Sources: The above budget figures were "rounded-off" from estimated amounts budgeted last year. These amounts do not accurately reflect the approved funding ratio which is as follows: Spring / Tierra Rejada AOC (026) : 1/3 L. A. Avenue AOC (027) : 2/3 Actual costs will be distributed to these funds in accordance with this ratio. RECOMMENDATION Staff and the Public Works, Facilities and Solid Waste Committee recommend that the City Council take the following actions: 1 . Approve the additional services described above and an increase in the contract fee from $53 ,714 to $58,714 ; 2 . Approve a ten per cent (10%) contingency and authorize the City Manager to approve additional work, if required, not to exceed ten percent of the revised contract amount; and 3 . Authorize the City Manager to sign necessary contract documents. pedbrg5